Loading...
HomeMy WebLinkAboutDRB120149 Desi�n Re�riev�r Boa rd I��TI�N F�I�M � Departrnent of Cammunity Deweloprnent ����� � 75 �auth Frorrtage R�ad, Vail, �olnradn 81�i57 tiel: 970.479.�139 fax: 97�.4J9.�45� aor.w,,,r���••� web: www.vai Igov.eom Project Name: CHANGES TO BOILER PLACEMENT DRB Number: DRB120149 Project Description: ROTATE PROPOSED CONCERT HALL PLAZA BOILER ENCLOSURE TO MITIGATE THE UTILITY CONFLICT. Participants: OWNER VAIL COLORADO MUNICIPAL BLDG 05/09/2012 75 S FRONTAGE RD VAIL CO 81657 APPLICANT VAIL COLORADO MUNICIPAL BLDG 05/09/2012 Phone: 970-479-2161 75 S FRONTAGE RD VAIL CO 81657 Project Address: 75 S FRONTAGE RD W VAIL Location: CONCERT HALL PLAZA BUS STOP Legal Description: Lot: Block: Subdivision: UNPLATTED Parcel Number: 2101-064-0000-3 Comments: BOARD/STAFF ACTION Motion By: FORSTL Action: APPROVED Second By: K]ESBO Vote: 4-0-0 Date of Approval: 05/16/2012 Conditions: Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 (PLAN): DRB approval shall not become valid for 20 days following the date of approval, pursuant to the Vail Town Code, Chapter 12-3-3: APPEALS. Cond: 202 (PLAN): Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Planner: Bill Gibson DRB Fee Paid: $20.00 p � � � o � � Department of Community Development 75 South Frontage Road TOWN OF VAII' MAY 0 9 2012 va�i, co s�ss� � Tel: 970-479-2128 www.vailgov.com TOWN OF VAIL Development Review Coordinator Application for Design Review I, Changes to Approved Plans 'I � General Information: This application is for all changes to approved plans prior to Certificate of Occupancy. I An application for Design Review cannot be accepted until all required information is received by the Commu- nity development Department. Design Review approval expires one year from the date of approval, unless a building permit is issued and construction commences. Submittal Requirements: 1. Three (3) copies of all pertinent approved plans with illustrated, labeled changes 2. Joint Property Owner Written Approval Letter, if applicable. Fee: $20 � Single Family I ^ Duplex � Multi-Family I✓ Commercial Description of the Request: Rotate proposed Concert Hall Plaza Boiler Enclosure mitigate the utility conflict. Physical Address: 600 West Lionshead Circle Parcel Number: 2101-063-08-012 (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.) Property Owner: Town of Vail Mailing Address: 75 South Frontage Rd, Vail, CO 81657 Phone: 970-479-2235 Owner's Signature: Primary Contact/Owner Representative: Tom Kassmel Mailing Address: 1309 Elkhorn Drive, Vail, CO 81657 Phone: 9�0-479-2235 E-Mail: tkassmel@hotmail.com Fax: 9�0-479-2166 For Office Use Only: Cash CC: Visa/MC Last 4 CC# Exp. Date: Auth# Check# Fee Paid: �(�1 V ED Received From: Meeting Date: DRB No.: U�Q�o� �)y q Planner: �.�. Project No: P�S I 1— �o1y fl Zoning: Land Use: Location of the Proposal: Lot: Block: Subdivision: Lf A�Pl.l�i T��D May 14, 2012 E LH Circle/Concert Hall Plaza Streetscape SECTION 07 7100 VEGETATED ROOFSYSTEM PART 1 - GENERAL 1.1 SCOPE Furnish all labor, materials, tools, and equipment to unload, hoist and install vegetated roof trays, by GreenGridO Green Roof System provided by Weston Solutions, Inc. (WESTON), or approved equal. The System shall include tray modules, growth media and the vegetation as specified on drawings and as directed by the Landscape Architect. This work shall also include installation of edge treatments, rubber pavers, decorative ballast, slip-sheet, and an irrigation system, if specified. 1.2 RELATED WORK SPECIFIED ELSEWHERE A. Roofing Systems—see Architecture specification. 1.3 QUALITY ASSURANCE A. There should be no deviation made from this specification or the detail drawings without prior written approval 14 days prior to the start of the project. B. Before installation of the modules, the waterproofing surface shall be inspected by a technical representative of the waterproofing installer/manufacturer to determine the adequacy of the waterproofing surFace to accept the tray modules. C. It shall be the Owner's responsibility to determine the adequacy of the structure to support the existing and proposed loads. Verification of the integrity of the waterproofing for water tightness shall also be the responsibility of the Owner if the green roof is installed on an existing waterproofing system. D. Upon completion of the installation, an inspection shall be conducted by a System Technical Representative to ascertain that the modules have been installed according to these specifications and details. This inspection is not intended to be a final inspection for the benefit of the owner but for the benefit of determining whether a warranty shall be issued. 1.4 SUBMITTALS A. When the proposed project components vary outside of this specification, submit these altered components for review. B. Submit an installation plan including but not limited to: waterproofing quality control, system delivery, and maintenance plan until green roof acceptance. C. Provide a detailed water hook-up plan on the drawings if an irrigation system is required. PART 2 - PRODUCTS 2.1 SYSTEM TRAY MODULES A. Vegetated Green Roof System Tray Modules are formed of 4" height 150 mil recycled (100% pre-consumer) High Molecular Weight Polyethylene (HMWPE) protected with UV inhibitor and stabilizers. B. GreenGridO Modules sizes (Module OD = ± '/8"): Mary Hart Design LLC 07 7100-1 VEGETATED ROOF SYSTEM Change Order 4 1. Extensive: Standard 18"x 24"x4" G3 modules -see L201 plan layout C. Tray Module to be delivered to the project location complete with growth media and pre- planted and/or pre-grown to 80% coverage with vegetation of the color and type desired by the client suitable for a green roof application. D. Tray Module weights (Bulk density at maximum water holding capacity): 1. Ultra-Extensive System (2.5-inch): 11-13 Ibs per sf 2. Extensive System (4-inch): 18-22 Ibs per sf 3. Intensive System (8-inch): 35+ Ibs per sf E. Tray Module clearance above the roof is 0.5 inches. 2.2 GROWTH MEDIA A. Tray Module Growth Media is an engineered light weight blend consisting of inorganic and organic components. Formulations are based on the German FLL"Guidelines for Planning, Execution and Upkeep of Green-Roof Sites" 2.3 VEGETATION A. Tray Modules are to be delivered to the project location complete with growth media and vegetation pre-planted and/or pre-grown to 80% coverage with plant species desired by the client suitable for green roof applications. B. Extensive System—GreenGridO recommended Extensive plant mixes are composed of highly drought resistant ground covers that can thrive in a non-irrigated (climate dependent), rooftop environment in the project location. Vegetation shall be jointly selected by manufacturer and project landscape architect according to their USDA hardiness zone classification. 1. Recommended planting density-Vegetation should be supplied in a minimum size of 2- inches deep by 1.5-inches wide (plugs)and planted 4 to 6 inches on center(18 to 16 plants per 2x4 module, respectively). C. Intensive Svstem—_GreenGrid recommended Intensive plant mixes shall include grasses, perennials, and/or groundcovers that can thrive in an irrigated or non-irrigated, rooftop environment in the project location. Plants shall be selected according to their USDA hardiness zone classification. 1. Typical planting density-Vegetation should be supplied in grow-plug or quart size containers and planted in the GreenGridO green roof modules at a rate of 8 to 12 inches on center(11 to 8 plants per 2x4 module, respectively). D. Vegetation shall be installed in accordance with the landscape design 2.4 GREENGRIDO ACCESORIES A. Rubber Pavers are required 1. Standard Paver size: 2 feet by 2 feet, and 1.75-inches in depth. Various paver depths are Mary Hart Design LLC 07 7100-2 VEGETATED ROOF SYSTEM Change Order 4 available. 2. Pavers are composed of 100% recycled (post-consumer) rubber and are available in various colors. 3. Standard Paver weight: 7.5 Ibs. per square foot. B. Edge Treatments (optional) Standard: 0.040 Painted Aluminum (recycled content 91%)or 24 gauge Painted Steel (recycled content 28 to 35%)for placement on viewable edge of modules. C. Irrigation Systems (by others) Irrigation requirements will be dependent upon project location and plant selection. For Extensive GreenGridO Systems planted with a mix of highly drought resistant ground covers, a backup system to irrigate the green roof during prolonged droughts or during hot dry windy weather patterns is to be provided. Simple overhead spray system with spray heads, or spigot/hose/sprinkler systems are inexpensive and effective methods. These also provide the means to optimize the evaporative cooling effect of the GreenGridO Green Roof System during such weather events. PART 3- EXECUTION 3.1 DELIVERY AND HANDLING A. Installation Season: 1. Northern Climates: Unless otherwise permitted, module installation shall be done between April 15 and October 15, but not when the weather is below 50°F. 2. Southern Climates: Will be dependent upon weather and/or plant availability B. Do not install on saturated roof surfaces or under freezing weather conditions, the latter unless with the express permission of Weston Solutions, Inc. C. Coordinate the completion of installation within a 24-hour period from the time the modules are to be delivered. D. Handle planted modules with care. Do not drop, kick, or point-load modules during handling and installation. 3.2 SITE PREPARATION A. PerForm module installation only after appropriate waterproofing system, with the proper taper to allow for drainage, has been installed and inspected. It is strongly recommended that these areas be leak tested prior to module installation to confirm water-tightness. B. Erect safety signage and provide fall protection/fall prevention equipment as required under OSHA. C. Restrict traffic from work areas until modules are installed and there after to restrict damage to the plant material. D. Thoroughly sweep away all debris, foreign material, etc. from the waterproofing surface. Mary Hart Design LLC 07 7100-3 VEGETATED ROOF SYSTEM Change Order 4 E. Refer to Waterproofing System manufactures' recommendation toward acceptable slip-sheet protection fabric. 3.3 APPLICATION OF SYSTEM TRAY MODULES A. Remove all debris from the slip-sheet surface that might interfere with installation of the modules or compromising the integrity of the waterproofing surface. B. Place modules over the slip-sheet in the desired locations in accordance with the landscape design. C. Modules shall be installed in straight rows, tight against each other, and arranged in the proper directional orientation. D. For connecting modules together, drill a hole through the middle of the outer lip at the top of the tray continuing through the inner wall of tray. Using a 150 pound black"zip tie," put the tie through the hole and cinch up tight. The hole/zip tie shall be at 2 foot centers: 1. 2 x 2 modules-4 ties per module 2. 2 x 4 modules - 6 ties per module E. Installed modules shall be watered sufficiently with a fine spray so as to thoroughly moisten the growth media from top to bottom. Water shall be free of substances harmful to plant growth. Hoses or other methods of temporary irrigation shall be furnished by the Contractor. 3.4 WARRANTY A. GreenGridO Modules: WESTON warrants that each GreenGrid° Module (the "Product")will perform its function of containing plant growth media for a period of twenty (20) years from the date of shipment of the Product by Weston. As used herein, "Product" means only the module and excludes (i) any plants, growth media, and any other materials placed within the GreenGrid modules, or(ii) any irrigation, mechanical, structural, or electrical components contained therein or attached thereto. B. Standard 30 Dav Plant Limited Warrantv: WESTON will supply replacement plant(s)free of charge for any plant found to be dead or in severe decline (beyond the point of returning to aesthetic and economic value)for a period of 30 Days from the date of shipment of the Product by Weston. This warranty only covers those species selected and/or approved selections by WESTON horticulturists. Those NOT approved but planted to meet a design requirement shall not be covered. This warranty is NOT in effect for plant material purchased and installed outside our recommended installation season (Installation Season: April 15th through October 15th)or plants purchased and installed by others. C. OPTIONAL: 1 or 2 Year Extended Plant Limited Warranty. Please contact your local WESTON representative for details. 3.6 30-DAY MAINTENANCE PERIOD A. Installation contractor shall maintain the vegetated tray modules for a period of at least 30 days after completion prior to acceptance from building owner. B. 30-Day maintenance shall include: 1. Water the System once a week (weather dependent)too aid in plant establishment. Mary Hart Design LLC 07 7100-4 VEGETATED ROOF SYSTEM Change Order 4 System shall be watered more frequently during extended hot and dry weather especially when plants are showing signs of wilting. 2. Perform spot weeding as necessary. 3. Repair, rework, and replant all areas that have washed out or are eroded. Replace dead plants with new plants. C. Upon completion of the 30-day maintenance period, a written maintenance plan for the specific green roof system shall be submitted to the building owner. A GreenGridO Representative will be made available to go over this document. 3.7 ACCEPTANCE A. Inspection to determine acceptance of modules will be made by the Owner, upon Contractor's request. Provide notification at least 7 working days before requested inspection date. 1. Modules will be acceptable, provided all requirements, including maintenance period, have been complied with, and healthy, even colored viable plants are established. B. Upon acceptance, the Owner will assume module/plant maintenance. 3.8 CLEANING A. PerForm cleaning during installation of the work and upon completion of the work. Remove from site all excess materials, debris, and equipment. END OF SECTION Mary Hart Design LLC 07 7100-5 VEGETATED ROOF SYSTEM Change Order 4