HomeMy WebLinkAboutDocuments & Plans 1982-2007oo\ntJ\rn tEvELoF$errr
Design Review Board
ACTION FORM
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2139 fax: 970.479.2452
web: www,vailgov.com
Project Name: FALKENBERG ADDmON
Project Descraptioni
FINAL APPROVAL FOR THE ADDMON OF GRFA ON ALL THREE LEVELS
Participants:
owNER FALKENBERG, BRUCE R. & t-AUM05/14l2007
830 S MADISON STREET
DENVER
co 80209
APPUCANT SHEPHERD RESOURCES, INC. 0511412007 Phone: 949-3302
PO BOX 1624
AVON
co 81620
License: C000002193
ARCHITECT SHEPHERD RESOURCES, INC. 051L412007 Phone: 949-3302
PO BOX 1624
AVON
co 81620
License: C000002193
ProjectAddress: 3944 BIGHORN RD VAIL Location: 3944 BIGHORN ROAD
Legal Description: Lot: 7E Block: Subdivision: I-ANDMARC TOWNHOMES PH I
Parcel Number: 2101-111-0401-2
Comments! Approved with condition
DRB Number: DR8070200
BOARD/STAFF ACTION
Motion By: Gillett
Second By: Dubois
Vote: 3-0-0
Conditions:
Action: APPROVED
Date of Approvaa| L21 L912007
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review commiftee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval,
pursuant to the Vail Town Code, Chapter 12-3-3: APPEALS.
Cond: 202
Approval of this project shall lapse and become void one (1) year following the date
of final approval, unless a building permit is issued and construction is commenced
and is diligently pursued toward completion.
Cond: 113
All development applications submitted to the Town after the effective date of
Ordinance 26, Series 2006 shall be subject to the pending employee housing
regulations in whatever form they are finally adopted; provided, however, that if
the Town fails to adopt the pending employee housing regulations by April !5,2007,
this Ordinance shall not apply to such development applications.
Cond: CON0009657
Davinci synthetic shake roofing material shall be used on all 2 th:L2 roof elements,
unless and until the Applicant submits evidence and information from the
manufacturer of DaVinci roof materials documenting that using such material on a 2
rh:L2 roof pitch will otherwise void the warranty for the product; in such instance,
the DRB endorses the use of standing seam copper roof material in all areas of 2
7z:12 roof pitch.
Planner: DRB Fee Paid: 33OO,OO
flm{0rT/tjt
Additions-Residential or Commercial
Application for Design Review
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2t28 f ax: 970.479.2452
web: wvwv.vailgov.com
General Information:
All projects requiring design review must receive approval prior to submitting a building permit application. Please refer to !
the su-bmittal iequiiements for the particular approval that is requested.
-nn
application for besign Review cannot O" .G)
accepted until all required information is received by the Communjty Development Depafiment. The project may also need f liJ
to be reviewed by the Town Council and/or the Planninq and Environmental Commission. Desiqn review aooroval laoses V-to be reviewed by the Town Council and/or the Planning and Environmental Commission. Design review approval lapses
u F
o
\,
unless a building p€rmit is issued and construction commences within one year of the approval.
Description of the Request:
Location of the Proposa,, .". fl*tQ-
physicar Address: i1+4 ferC, \l.,tA p+.
Parcel No.: 7-t o\ | I \ r..\.l'of 7- (Contact Eagle co. Assessor at 970-328-8640 for parcel no.)I o zn4v
Zoning:
Name of Applicant:
Mailing Address:
Type of Review and Fee:
! Signs
! Conceotual Review
$s0
No Fee
! New Construction $650 !q nooiuonp04dtcosr-}t PrrO $3oo I
E Minor Alteration $250
(multFfamily/commercial)
n Minor Alteration $20
(single-family/duplex)
tr Changes to Approved Plans $20
D Separation Request No Fee
Plus $1.00 per square foot of total sign area.
For construction of a new building or demo/rebuild.
For an addition where square footage is added to any residential or
commercial building (includes 250 additions & interior conversions).
For minor changes to buildings and site improvements, such as,
re-roofing, painting, window additions, landscaping, fences and retaining
walls, etc.
For minor changes to buildings and site improvements, such as,
re-roofing, painting, window additions, landraping, fences and rebining
walls, etc.
For revisions to plans already approved by Planning Staff or the Design
Review Board.
Name(s) of owner(s): ?lAcE- €A wV-.'frA -?t+rt4
Owner(s) Signature(s):
q^.-.1
ta'
TOI4'N#
ADDMONS . RESIDENTIAL OR COMMERCIAL
SUBMITTAL REQUIREMENTS
General Information:
This application is required for all proposals involving the addition of GRFA (gross residential floor
area). This includes proposals for 250 additions and interior conversions, See Title 12, Chapter
15 - Gross Residential Floor Area for specific regulations,
I. SUBMITTAL REOUIREMENTS**-/ff All pages of Application is complete
Eflhecklist is completed and signed
El-lta mped Topogra phic Suruey*
Efsite and Gradino Planx
EFl.andscape Ptani
%rchitectural Elevations* (l set of Redlined elevations)
Ef Egerior color and material samples and specifications.
ffchitectunl Floor Plans* (1 sei of Redlined ffoor plans)
E/t-ignting Plan* and Cut-sneetls; for proposed fixtures
EFTitle report, including Schedules A & B to veriry ownership and easements*
. El-Thotos ofthe existing site and adjacent structures, where applicable.
Nff, O written approval from a condominium association, landlbrd, and joint owner, if ' aoolicable
N,[O Si#tpecific Geological Hazard Repo( if applicablex ' tr The Administrator and/or DRB may require the submission of additional plans,
drawings, specifications, samples and other materials (including a model) if deemed
necessary to determine whether a project will comply with Design Guidelines or if the
intent of the proposal is not clearly indicated.
Plesse sabm firee (J) copies o/the mo/ertbls ,tated urTi zn ostenSi (*).
*xFor interior conversions with no exterior chanoes, the submittal requirements include a
complete set of existing and proposed floor plans, a title report, and written approval from a
condominium association, landlord, and joint owner, if applicable.
I have read and understand the
Project Name:
Date Signed
F: \cdev\FoRMS\Permlts\Planning\DRB\drb_addition_1-25-2007.d0c Page 3 of 14 ru8l20os
ffi"{,*, il" t6,r; {f *u'"-^" r-..a6,re$',. -
io*g ML%1 rr
^narztl IIE ttto'tt>on*r drur-^ #
Buildino Materials
PROPOSED MATERIATS
Tvoe of Material Color
?a{ r Sc-r atsnlaq u- 1ttTT*gapN
,a
l\enut 1 g-alrP \f-thrr-r rguf.ff-)
Roof
Siding
Other Wall Materials
Fascia
Soffits
Windows
Window Trim
Doors
Door Trim
Hand or Deck Rails
Flues
Flashing
Chimneys
Trash Enclosures
Greenhouses
Retaining Walls
Exterior Lighting
Other
?t-Dt t-O TLr-l,/anean
g./.t.V tlO-"1u,{
Notes:
Please specifo the manufacturer's name, the color name and number and attach a color chip.
\Apt 2
Itlooo DAt.V flr?ar.lAI
6zY.{9Tlr.,rh il\{rTFz
luloor2 VEr* Pznnt'.|F\
6r,rgrtptn \{lh\E -r- wtx, F) ool.{^l
lJoon 9t>ut* brtotdFJ
Irtaoo gttr* (?Vt'esN
t-trrra\ EFtbTll.\h
(e rtPrzv oc- F,o, Arfio /lurrt -f?Att.L fr(-eoUrl)
Fata,t'\ rzxrafirsr"1z-r*nv-, rtnorr.rlS
N/A
Tar+\ v*ul Esr';nNL^e- fiaenry
N/A
F: \cdev\FORMs\Permits\Planning\DRB\drb_addition_1 -25-2007.doc PageT of L4 1112312005
Botanical Name
PROPOSED IANDSCAPING
Common Name Ouantitv Size
PROPOSED TREES
AND SHRUBS
EXISTING TREES
TO BE REMOVED
Minimum Requirements for Landscaping:Deciduous Trees - 2" Caliper
Coniferous Trees - 6' in heioht
Shrubs - 5 Gal.
Tvpe Souare Footaqe
GROUND COVER
SOD
SEED
IRRIGATION
TYPE OF EROSION CONTROL
Please specifo other landscape features (i.e. retaining walls, fences, swimming pools, etc.)
\ffiN+r-ffirA
F: \cdev\FORMS\Permits\Planning\DRB\drb_addition_1 -25-2007.doc Page 8 of 14 LLl23l2005
Printable Details
AccountNumber: R009751
Parcef Number: 210111104012
TaxArea: SC103
Mill Levy: 49.6250
Owner Name/Addr6ss: FALKENBERG, BRUCE R.
600 S CHERRY ST STE 1108
DENVER. CO 80246
Legal Descrlptlon: SUB:I-ANDMARC TO\ NHOMES PH | & ll
LOT:7E BK-0666 PG-0306 QCD 03-23-95
R200603035 SWD 02-01-06
Physical AddBss: 003944 BIGHORN RD Unit : 7E VAIL AREA
Page I of2
Proporty Tax Valuatlon Intomation
Actual Valuo Assessed Value valu€
Land 450000 35820
lmprovementg 1130420 89980
Total 1580420 1258q)
Sale History
Rec€ption Numb€r: n/a
Book: 0541
Page: 0625
Sale Date: 111211990
Sale Price: 340000.00
Deed Type: WARRANTY DEEO
Grantor n/a
Remarks: nfa
Reception l,lumber: n/a
Book: 0338
Page: 0762
Sal€ Dat6: 3f2411982
Sale Price: 300qD.00
Deed Type: WARRANTY DEED
Grantor n/a
Remarks: n/a
lmprovoment Informatlon
ResidentialBuildings: 1
Commerdal Buildings: 0
Heatsd Ar€as
MAIN FLOOR AREA 2660.000
Total 2660
All Ar€as
MAIN FLOOR AREA 2660.000
BALCONY 256.000
GAR,AGE ATTACHED FINISHED 555.OOO
Building Characterlstlcs (Flrst lmprovment In Account)
ABSTRACT-CODE SINGLE FAM.RES.IMPROVEMTS
ACT-YEAR-BLT 1981
AIRCOND NONE
ARCH STYLE 2 STORY
hup ://fcs.eaglecounty.us/patie/printable_details.cfm 5tr0/2007
Printable Details
BASEMENTFINISH
BATHS
BEDROOMS
BUILDING-TYPE
CONST-QUAL
DEP,I1
EXTERIOR-WALL
FIXTURES
FLOOR
FRAME
GARAGE
HEATING-FUEL
HEATING-WPE
INTERIOR-WALL
LOCAL-CODE
NEIGHBORHOOD
ROOF-COVER
ROOF-STRUCTURE
ROOMS
SHAPEO
STORIES
SUPER-NBHD
UNITS
USE-CODE
WALL-FIN
Page2 of2
NO BASEMENT
4.00
3.00
DUP.TRIPLEX
GOOD
YEAR . 198.I
WOOD SD GD
't4
CARPET INV
WOODFMME
GARAGE 501650
GAS
HTWTR B/B
DRYWALL
DUP/TRIPLEX
BIGHORN ALONG HIGHWAY 6
CEDAR SHAK
GABLSHIP
I
tUA
sToRtEs 2.0
EAST VAIL / BOOTH FALLS
1
RESIDENTIAL
N/A
Tax History
Tar Year Trarcactlon Type Amount
2006 TaxAmount 3470.28
2006 Tax Payment: Wtol6 -3470.28
2005 TaxAmount 3240.62
2005 Tax Payment: Whole -3240.62
2Oo4. TaxArnount 2985.78
?O0/ Tax Payment l/Vhole -2985.78
2003 TaxAmount 2913.&1
2003 Tax Peyment: mob -2913.64
2002 TaxAmount 2977.24
2002 Tax Payment: Vvhole -2977.24
http ://fcs.eaglecounty. us/patie/printable_details.cfm 5n0/2007
1;. (g:- i+ I
DEC t, .
TOWluf-; -' \'
JOINT PROPERTY OWNER
WRITTEN APPROVAT LETTER
l, Laura Christman, a joint owner of property located at 3944 Biq Horn Road. Vail. Colorado.
provide this letter as written approval of the plans dated November 28. 2007, which have been
submitted to the Town of Vail Community Development Department for the proposed
improvements to be completed at the address noted above. I understand that the
proposed improvements include:
New exterior materials (approved last year), remodels and additions as indicated in
n
n
i
I
I
I
ir 1,. i;, i
tirl
2007 il,r,;
the above dated drawinqs with a finished GRFA of 3,785 souare feet.
Ur€d/^?A L:.L, cL cll.lar,,oa,-o tinu.\c ti4la1'\ u,"..g
or only
Additionally, please check the statement below which is most to you:
I understand that minor modifications mav be made to the plans the course of the
review process to ensure compliance with the Town's codes and regulations.
(lnitial here)
course of the review process, be brought
a pprov al before 1n dergoing fu rthe r by the Town.
joint property owner letter revised 10/18i/2006 Er
se, which are made to the plans over the
aftention by the applicant for additional
Wu$ {r**oaoalA- '4 \l^,[/- M L
OJ.LVLI\ I NLr\I\L NT r cl,\.l J I v.{(J()l3uJ-|.|cly ru ruut tI 'JI r,vz
*ffi UTILITY APPROVAL & VERIFICATION
Subdivision:
Authorlzed Sionature
14{ ks
Thls- form selves b vEriry that the proposed lmpmvements will not impact any odsqng or proposed ufrllty sewlces, and also b verlfy tsrvlce avallabflity and locatbn for nett, construction and $ould be F{ in onluncdon wiUr prepartru rcrs Ltility phn jnd
schedulinq lnstallatlons. A slte plan,inclug,lgqqurlg plan, floor plan, and etevationi, .t'itt u" *iiriilta 6G].t|o;;i';dtii;;;for approval and verlflcatlon. PLEASE ALLow uP To 2 wEEKs FoR APpnovL on couniffs fnorq fxE unlfry collPANIES. ff )ou are unable to obtaln @mrnents withln that gmeframe please contact rheiown or vait.
Develonr b Prcyl& Lot Mtss Information:
Lot Addr€$!
QWESr
970.468.6860(tel)
970.468.067z(tdx)
Contacts: Sam Tooley
samuel.toolev@oweS com
XCEL HIG}I PRESSURE GA!;
e70.262,.r075 (Et)
970.468.1401 (rax)
@ntacb Rich Sbnercs
richard.sisnerosdxcelenerov. com
HOTYCROSS EI{ERGY
970.947.5{25 (Et)
970.945.4081 (fax)
Contad: JelT Vrcom
ivroom(oholvcross.com
XCEL ENERSY
970.262.4038 (fax)
970.262.4024 (ret)
Oontacts:
Kit Bogert
Kathryn. Booert@XCELENERGY.com
EAGLE RIVER WATER&
SANTTATION DISTRICT
970.476.7480 (eD
970.476.40E9 (fax)
Contact Fred flaslee
fhasleerOenrusd.oro
COUGAST C'IBLE
970.418.82218 (ED
970.9,t9.9138 (fax)
C-ontace Davld Evans
david evans@cable.comcast.com
NOTES:
rc }i|4Y102007
/t f&Ltrt€>lQ.o. ds I fu /do/"sw'
1. If the uflllty appru,al & verificatjon form has sbnatur€s from each of the ulllty companles, and no commenB are made dlrectv on the form, or no action is taken within 2 weeks of the UtiliVs rccelpt of the form without o<ptainatbn the Tovrn *ill pr*;;
that there are no problems and the development can proceed.
2. If a utility company has conems wfth the proposed corlsbucuon, the udllty rcpr6enEdve sha note drectty m the udlty verification form that tiere b a probhm rvhich rEeds to be resolved. fne issue shouli fren be deta ed tn an audna pner m itri Town_of Vail, Howevet, please keep In mlnd that it is the responsibility of the uUlity company and the applkant to resotve idenufied Foblems.
3. These vetfications do not relieve the contractor of the responcbillty to obhln a Public Way permit from the Departnent of Publlc Works at the Town of Vail._Utility locatlons must ba obtalned before diqoino ln iny publlc rlghtof-wif, or ea*ment withln the Town of Vail.
4. The Developer is required and agrees b submit any revised drawlngs to the utiliUes for & reverification if the
submltted plans are aftved in any way after the authorlzed signature date (unless othenMse speclticalty noted wtthin the comment
area (f thit fQrrD.
5.to.sT
DaE
Page 9 of 1{
!C{- 1gr.l
Commcnti
F: \dev\FORHs\Permlts\Planning\DRB\drb_addition_1 -25-2007.doc
ET,\
1A23l200s
-ffi uTluw ApPROVAL a VEitncA?roil
This fom erves b vertify that t|le p€Fsed imF€vetl|ents wlll not lmpEd any ed#qB of p|oped udlltt srn lcc, ard abo b nfry ewk- anlbb[hy rrd lmbr fur rs cm$ucton ard drq.dd be uEd in cDdundion with trrF.trE yotJr uttiv plm md
-Hulino in*allato|E. A sfte Can, hclLtfne Oradfle ptan, nmr pUn, sd claatknu,, Cnlt be glbmiibd b tfi. OtU|ini r-uttes
tu apgovd and verncElon. PlllSE AIJOW Up To 2 WllKt FOn
^FmOYAt
oR cot{tHlrt FROH ?l{E lmuty 6ollF ilIES. lf you are unable b ohlh commen6 r$tf*l thd Uncfranc Dtere olfid the Tovn d Vall,
Dclrllqq E hedda ad M*s hlffin:
utruars,3Q4llrldftilanl E'*re srHu'rn,ffiffdlsrurr?E
luthorEed 8llnrtuna Gonnrnb Plb
Qrf,EE
970..,{5E,5E60(H)
970..t68.0672(lq)
@nEcts Stm Todey
$rud,iadf[r@dd-em
rcCtHleHm8$UREG IS
e70,262.{o76 (U)
970,{68,1,O1 (bO
6nta(! Ndl Ssneror
ffiE4#9!qe6lrcdsss,m
HOLYCnO88EI{REV
970.9t7,ttzt (tsD
97o,915.aotr (Pdr)
Onmt Jcff vm9tn
lll9qreb&nfEQn
XCELEIIRIY
970.262.1039 (Po()
970.26a.4024 (ED
cortact9i
Xh Eogett 5].L0t
EA6E RIT'ERITATERT rffitATloilDE?nlcf
970.47€.7{80 (tcl)
e70.r76..1089 (frx)
Ofltid! ft,€d tEle€ft@rgons oorcrsrc lLE
970r18.&M8 (rd)
9t0.9|9.9118 (far)
conEcB oavld Eva|u
darid ls,rpsdE^corrEait^rnm
9.to..c7
Dah
Prqe I ot 14
df,Er t. lf dre- rnflU app|ovll e uedftcatifi brm tEr Stutmf frcm each of fto ufllty mrnpanhs, and no cDmtrEnts r|! mth dndy
an the forrn b hb *n b bhcn r$trln 2 tfccks C $r t tlivE tcclpt of the fofin widloqt eolaimdofi the Town will learrp
t'|* tncrg are r|o Problems and tt€ de{r€bPtrtil crn Pr@d-
2, tf a d[ty co;p.ny hrs concrns wih ttr prupoced on6tuctfif SE tfiUry EFe$nEUve $all lotE dfecuy on the t|llity
verlfAmn f6rm tirr there f a ffoblem u'hlch nee(t3 to b. rr oN, TtE b3l 5truld then be dfilled in an rffi letlar b tha
Towrr d tEil, jtavf,l,eL otease feep in mlnd thrt it b dE rttoorEibillty d Ee uullv cE|nF ry ilrd th0 spplEant to trst€
idsrun€d Pmuemt f. ffns: iirfncUons do rd mlie1jt Ure confador of thc nmordblllv b otbin a Puuic Wry Pemit from ttn Dcparffi of
ntUnC WOrtrg at fre T6^rn of Vait, In any publc
'Etht
d.rrary or easnpnt
wfiftln the Town d Vtil. A bulldind E;h b r|d r PtlUle gry
+ Thg oairebper ts l€$lm6 arr agreE6 b flDmlt rny r lsd drrwlngF b tlE ufltfu€s fof nFapgrorill a rF{arficidon r ?E
submlhcd plais are altircd h any wry after the ardrorized slgn hnE dtlt6 (unlesq odrehirige speollcaily tlGd wfihin the otnmqt
F: \cder{FoRrE\PemiE\Ptarnlne\DRB\d6..addfi otul'25'2007.doc
r|,\
Ltl23l2ffi5
*#UTILITY APPROVAL & VERIFICATIO]I
Thb- form re es b }triry E|at UE proposed imHoverr|e{|t5 wlll not impoct .ry e{stirE or pmpGcd Wtity sn c€s, and ebo b v€dry sen'ke arcllabflty and l@tl)n br n*r on*ucfon and strolo ue usei in ont-r"i6"'t rn-mearirE !,DUf rt ity pbn ad sd'edulhg rtsillatiors A slte plan, jnjudlns gradirg phn, floor phn, and etevzuoni, rrirri u. rliini"o ritin toti"i1,i'"iriiii tur appro-vdl €nd verifi@tbn. pltlst luorv-upto z weEG'Fotippnovt- o'ncorrrenii rnOf.r ruE Unlify '---
C1)flPAilfElt If you are unaHe ro obbin comngrb wltftln that dnnfi.me plea* ontacr Theiown of Vait.
DewloFr b tuovifu Ld Affi@ Inlontatiux
{to-o-7 /
I' If ttE udllry approval & t/erlficatton fqrn ha$ dgnatwes fiool eadr d the, rnility cornpanies. and no co,-rEnE are mde dredy on thc form, or no actiltl is bketl wltfiin 2 weeks of sre LltillVs receipt of dre forn wthorfi ept *lruon th€ Town will pre$nE that tr|ere a|€ no pmuems and tfu dendOpment E prreecl.
2. Ir t dti[ty conPEry has conerns wnh the proposed consfu{lo!, thr uttw Epresenhdve sha nob dlr€dly ofi the udlly yerincaU9L t9. rm. rut ticre is a probtem ntrtch nieds to be rtsdyed. ite tss," 9rcufl iier,
-0.
O.Oi* fn an JU6irr- renei m tinl JILof. Val|... Ho|vercr, plersp keep in mtnd that it b the rcgonsttifty of flE uutt ;p.r,y aM the apdtcant ro r€roh€idenUfied fioblerns.
*,ffi^:"gls-9__ryJ.fln:j9_CflurTqof tfie-resporHbiltty!gobbin a tubrrway Fermirfrorn theDQDaftmentoF tublh Wo*s at the Town of \hn.h any public d{t*dr^,ay or eilsemgrt vfi1ln ttte Toryn of Vail.
4r The Devebper is requlrud and agtees b ily rwlsed drdyvings to the uflttths fior re-approaiE *IH.*T:"lLl:J"-"'v-i#fi ,t?;ffi #JEff Hff dfr .H'iH"ruffi i,i^F,ffi *cornment
rrtAddres$ ??'f4r-al[.!fi Eaao . srrdivlsion:Fffi,Fruglcfi;rbt#J-A__
Authoriz.d Sl(hetu|| ' Conmrnts Elg
QltErST
9?0.468.6860(bt)
970.468.067zf.x)
Cortbcts: Sam T<roley
samu€l-t€olev@dwegt cpm
XCEL HIGH PRESSI'RE GArs
sm.262.4t 6(Wt
970,168.1401 (fix)
Conb4 Ridl Sisnetbs
rHlard.shnerc3GDxcdeneroy_com
HOLVCROSS EIIERGY
e70,917.5,,25 (d\
970.9{5.4081 (fax)
Contacb leffvloom
ivroo4@hoh.sc6.oetr
XCEL ENERgY
970.262^4018 (fu)
970.252,Q24(ED
ConEcb:ft B09st
Kattum. Emert@xctFNFRGY.com
EAELE RII'E1RWATER&
SAIUTATIOf| DISIECT
970.476.74&(ts;t)
e70.476.4089 (fa0
Contacts Fr€d Haslee
fhasleet0enrlsd.org
coitc.AsrcAaLE
970.418.8248 (tel)
970.949.e88 (ax)
Contxc Evid Evam
(hvid evdns@obr€.comcadt com
4CIEI
D6te
F: \cdar\FoRpF\pefl rr.rs\ptaring\DRAdrb_add,Uon_l -2F2007.d8 Page 9 of 14 1lIllr2o05
OcT. 17,2007 8:24A|\4
*s
HOtY CROSS ENERGY
Ufl I.IW APPROVAL E VERI FICATIOT{
N0.639 P, 1
Thls fonn se es b vrrfi tlnt the wonosed lmpmvemenb will rrot lmpet any erldng or pmpced
verry servle arallabuty rd l@tbn lor new con$uctirn and should b€ ,,sad in codunttlon with
sdrdulirE irlalldius. A rilte F& includng grading plan floor phn, and ele\adol6, SEll be
tor apprwal and wifiqtion. PT.HSE A!l3W UP TO p WEEI(S RIR APPROVAL oR Goi{li
ColtP f{lES. If yao ae unabte b obtrln snnenb wi$rin thattlnefuine please conffi The
Dcralafr b nE Ha LdAdtwrrtffiUt
{*d00i pbnail lour
Epft uulldes
rotAddr€cs: ??'f4 (a&\trn r Ellrro subdrvislonr
Autho?ized sion.tr€
QlvESr
970,r|6&6860(trf)
970.45E672(q)
Conffi: SamToley
emt d,toolev@ouEslcom
XCE|. HIGH PREISURE GAS
e70,262.1076 (E)
970.468 !101 (EcO
ftnbct RldtSbrers
ricbard"sisner6@eqlenelnr.rlm
l{oLY cRoss Et{ER61l
970.947J425 (teD
970.9.t5.{081 (fq)
ConbcE JefiVlr.fl
ivmon@holamgcorr
XCEL EI{ERdf
970.262,1ofi(td)
9m.252.4O24 (ED
Conbdsl
lct Bogert
K4h[F.EooertoXCAENERg.com
EAGllRNERWATERA
SNIrTATIOTI DI TRICT
970.476.7480 (teD
970.476.4089 (r&)
CovrbcE Frrd tladee
fhedee@ei,t sd-ott
COMC^STC,ASLE
970.418.82.t8 (Et)
970.949.98E (roo
Conffi Dat kl 6rans
Lot#! | E
Dail.
t&/,
david MoS@dtde.Om.A<tCOm
NOJES:
L U trre udlry apprsval A \,Ellffion fum has sigrEhres fio.n eadr of Sre uttfty compani=, ard rE cocrmenE are made drcctly
qr the frm, or no aci'm r aken vr'lthin 2 weeks d the Wlivs eceipt of tne fqrn wrtrout eqlaination tft Towl will F.€slrne
that ti€re a|e no problers and the deqrelopment @n prcceed
2 If a uuHry ompqny has onens wlttr tfie proposed co{lstuctod, Ure utilitt rcpiessrDadve dlall note drcdy 0l| $e tdllv
EificaEon fum rhat tlere is a protrlern wtrich mcds to be r€soh,Ed. The bsle $louH dt€n be detailed in an aladnd ledF to $e
Town d \rbll, itwever. plea* keep In mlnd that lt B the rcsondblllty of $e uUry compary and tle apdlont to rcsotve
HenEfled p{oblems,
3- Thee verificatims do r|ot refieve the confador d ttc Espott$bilty to ot bin a PtJUic Way Ptmit fiqn dE Depadtnent of
Rrblic Wods at the Tqrvn of Vai.ln any puUE dgttd-rcy qr easetrrcnt
wniln Ele Town dvail.
4. The Dareloper is required and agr€es any rarised drawings to $e utllties fr &if the
suhnltted pbns aI! alter€d h afly wdy aftertte audmrized signature date (hless oth$'rlse spedfl€ally rEtd vrlhln UE conuneflt
5.to.o7
F\ev\FoftltslP€nf iB\Phnnlng\DRB\drbraddlEorLl-Zt2007.doc ru7j,fzffi
FFrOr,t oa^tEsT <ruE>('t 1e 2oo7 -lE:lo/ST. lE:OalHo, TEOOOOOgE2 P 2
trffi
Subdavisionl
E (t,; l- li V
DEC 0 i 2007
rot#r -l E-
UTILITY APPROVAL & VERIFIGATIOI{
This form serves b vedry that the proposed improvements wlll mt hpact any existing or
verlfy servke avallabllity and locauon for new constructon and should be used In conjunctlon
scheduling installatlrns. A slte phn, induding grading plan, floor plan, and ele\ations, shall be submlted b the follor /ing utilities
for approval and verification. PI-EASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMltlElfTS FROII THE UTIUTY
COMPAIIIES, If )ou are unable to obbln comments wfrtin that tmeframe please aontact The Town of Vall.
Dcvelopcr to Eorldc Lot Addrss Inlwrrrationt
Lot Addr6r!
QWEST
D.ts
970.458.6850(teD
970.468.(r7z(rax)
Conbcts: Sam Tooley
sa muel,toolev@owestcom
XCEL HIGH PRESSUR.E GAS
970.262.2t076 (rd)
970.468.r401 (fax)
Conbct Rlch Sbneros
richard.sisnef os@xcelenergv. com
aF AxJq
HOLYCROSS E]{ERGY
970.947,5425 (tel)
970.945.,1081 (hx)
Conbct: JeF Vroom
'ivroom(dholvcross. com
XCEL ETIERGY
970.262.4038 (fax)
970.262.4024 (tel)
Contacts:
Klt Bogert
Kathn n.Eooert@XCELENERGY.com
EAGI-E RIVER WATER &
sAt{rrAnon DrsrRrcT
970.476.7480 (ED
970,476.4089 (fd)<)
Contact: Fred Haslee
fhasl€e@erwsd.org
COTIICAST CABLE
970.418.8248 (bD
970.949.9138 (f.x)
Contact: Davld Evans
davld evans@cable.comcast.com
NAIESi
1, If the uulity appro\r"l & verlflcaflon form has signatures from eacfi of the udllty @mpanies, and no coflimenE arc rnade dirccty
on the form, or no acton is taken wlthln 2 weeks of the Utility's r€ceipt of the form without eelalnatlon the To\,vn will presune
that there are no prcblems and the development can proceed.
2. If a utility cDmpany has concems wlth the proposed consfrwtlon, the uullty representative shau note dlrectly on the uullty
verfli@tion form that there is a prcblem wtrkh needs to be resoved. The lss€ should tten be dfilled In an atHled letter to the
Town of Vall. However, please keep In mind that lt ls the responsibillty of the uullty comparry and the applkant to resolve
ldenufled orcblems,
3. These verifications do not relieve the cont"ctor of S|e respondblllty to obln a Publlc Way Pemit frmr the DeparurEnt of
Publlc Wo*s at the Tonrn of Vail. Udllhr locadons must be oDtalned bcforu dicolno In any public right-of-wry or easement
withln the Tourn of Vall. A bulldlno oermlt ls not e Publk way oermlt End must bc obrtalned separablv.
4. The Da/ebper ls required and agrees to $bmit any re\risecl drawlngs to the utilities for re-appmval & revedflcation if th€
submltted plans are altered in arry way after the authorized signature daE (unless otherwlse spedncally noted wlthln th€ oomment
5.to-o?
Autho,izcd Sionaturc
F: \adev\FORMS\Permits\Plaming\DRB\drb-additioo-1 -25-2007.dc rw3nws
0c t-1 6-2007 I I :28 I ron-Efi su s701764089
, l./ tt LtN rl/\./
UTIUW APPROVAL & VERIFICATIO'I DEC 0 ;2007
Thls fom serves E v€dfy that the proposed lmprwern€nts wlll not lmpac any existing or
ver[,] sewEe anlhblllv and bcuon for ne,w oondnrtun and $ould be (6ed ln
sdredullng hstalhdong. A dte phn, lndudng gndlng pt!n, tloor plan, ard eteyduoffi, shall-be
for apprwal and vefiflcatlon pt EASE Alrow up ro 2 wEEtG FoR ApFRovAL oR. CollHg.{Ts FRoH THE uTruTy
CtlHPArfIES. If lou are unable !o obtaln commglc $dfiln that flmeframe please conb6 The Town of Vall.
Davzloper b ftovl* bC Addts thformea'oa:
-ffi
LotAddr6s!
QlvEsr
Subdivicionr
AuthodDd SiqneturD Ele
970..r68.6860(d)
970.468.0572(fao
Contrcts s|m Toofey
6amuel.tddl€v@qwen.cofi
XCE|. NIG}I PRESST'RE GIIS
970.262..*175 (e0
970.458.1401 (hx)
contacc Rldl Sbneros
rlchad.slsn€fircoxceleneroy.calfl
}IOLYCRDSS ETIERGA
970.847.51?5 (Et)
970.945.4(Al (fa0
Contsct: -teff vrsflr
ivroorn(6hohremlt.com
XCEL EIIERGY
970.262.4038 (fa)
970.252.402,1 (td)
@nEcE
Ktt 8o9E t
Kathrvn. BoqerI@XCRENERGY.com
EAGI.E RIVER IIIATERf,
SANIIATIOII DIS:TRICT
970.,475.7ts1 (tel)
970.{76.1089 (fa()
Cortbcts Fred tldee
fh6slee@erws4om
col,lcAsrc SLE
970.418.8248 (teD
970.949.9r38 (fax)
Contrt Davlt EvarE
rtavld_eIjtnipceblfi t;o{qraf . rom
1' If ihe utlllry appratrl & v€rlficadon form has signahrEs Fom each of the uillB comganter, and no cornmems are made dircdy
ofi the fom, or m acdon is taken wlthin 2 weeks of he tftillq/s r€crlFt of the fom $thdn ed*|auon the Town wtll presni
that there ar€ no Foblems ard the development can p|rced.
2. If ! ldItY @mtony has concems wtlr tfE prgpgse! consuclon, the udllty represenhtive rhall noE dlredly on t]le uuttty
r,edtlcadm fu1n tllat derc b a problefi wfrlch ne€ds b b€ resohrcd, The bsJe slro.dd tfpn be deblled In an atdEd t€frr to di;
Jgwq-of.Vallr. Hovrever, phdse feep ln mhd that lt ls the rcspordblllty of the utitity cofDpany 3nd the apdlcar* b rc€ove
klenufled D|oblems,
tddl;1L
ltul -a'7
3. These vedncadons do not relieve the cont|"dor of rhe Erponslbtllty to obiatn a tuulc wby Ferrnlt ior'n ttt Deparufleil of
Publlc Worl(s at dle Town of vaiL tltllih, lq3ation8 mo.Bt be obtelJEd.EFfoE dlooino In any publlc rbhtd{dy or ease m€nt wlthln ttte Tow|l of Vall, A hrlldang oc4tttt aF rtgt r hfbtb wav qarrrrh ?ndmust be obtii jt€q cc;|rrrlv. '
4..Tlre DevebPer ls requlred and agfe€s to nrbmlt any rwtsed &awingE b the utilities for eapporal a re-verifiedon lf the
subfliltted phns s'e altErEd In any wry ofte r the aufiorlz€d slgnature daE (untess ou|efwise sdeancary nomU within $e commert
5.to1.=-7
Dae
P,:J.i|) d L. LVz3lZOo5
T-610 P.001/001 F-3t4
;fl4ileob
udllry plil and
b B|e lblh hg utliti€s
ADb
Comrnenti
Fr \rdt\r\FoRl,s\P6fr'its\Flrr.|ht\DRB\drb-sddldo.r- !-:g.2Oo7-d.€
3944 Big Horn
Scot Hunn - 3944 Big Horn
Page 1 of 1
From:
TO:
Date:
subj ect:
"Adam Harri son""Scot Hunn"
LO/L2/2007 9:33 AM
3944 Big Horn
Hey Scot-
Douq and r met vesterdav with the adiacent neiqhbor to qet her siqn-off. that went
we] T: but she i-s qoinq to have a dociment drafted that ieither of-the two neiqhbors
can use more than half of the cumulative GRFA; she will not sign the loint Pr6perty
owner Approval Letter until that'i s'in p1 ace.' r'm pretty much-ready to go on drawings, and wi'l 'l have the site coverage,/GRFA calculations completed today; but wi'l'l stii'l be wa'itinq on the letter. aTsb. we've taken vour adVice on the- ipa terrace and will issie that as a modification to approved p'lans later
rhanks
Adam Harri son
Associ ate
..l.mh@viar.hir'.r.^m
DOUGLAS MILLER DeCHANT ARCHITECTS
SHEPHERD RESOURCES. INC./AIA
PO Box 162,t
Avon, CO 81620
T 970 9,19 3102 t970919 5l2l
file://c:\oocuments and settings\Administrator\Local Se.. . L0/L5/2007
Zone Gheck
Date: kF ?*t?m
Legal description:
Address
owner 6*v*.*v4.o*-
Block
Architect
Phone
Phone
Proposed use
Buildable area Lot size
TotalGRFA
l\
W"PrjmarfGRFA +(425) (675") =
f-Seeenddty GRFA +(a25) (675.;=
* 675 = 425 credit plus 250 addition ffi +tq^. 1,Abf
v4(.&y nI@ e l-; 1@ .t41'( lltjA+ = rteloL -z'tTct-. t*o-'/ Aaioffrq.-/. Reinainino r,)Existino Proposed /. Rehainino r,J.*- -
ez-
total
bt4q.
6t441
4totV
4zrtA
N"Ne-
lzoz €'ra+f cot'cg wTx-.6&awtze- <Feb+)
Does this
Site
ls
yes
lJ9egrn t/" €an- t.tlt+a-t€ 4s<-
with this request?
(pe the
Slopes)?
Height
Setbacks v
/v
20'
15'
1s',
% Proposed Slope
No
*sr.tarr.*=
€{'rDrrr4
E{/|rt€rA cttE 3 c.\r
e€+r&/u'et,.,
losrreor.' c-u{l(tu"s
v;/ 4retvr
Minlmum
N/A Required
(300)Garage Credit
Driveway o/o
Complies with TOV Lighting Ordinance
Are ff nished grades less than 2:1 (50o/o)
Environmental/Hazards
ls the Property non-conforming? Describe:
1) Percent Slope (< > 30%)
Yes
Yes No
2) Floodplain
3) Wetlands
4) Water Course Setback (30) (50)
5) Geologic Hazards
a) Snow Avalanche
b) Rockfall
lJ,€Eg filn;j1*q{tr ttlfr ,g*rfuldtrt
Permitted Slope
Previous conditions of approval (check property file):
3'/ 6', ,il€ <z
(30) (33)
Front
sioesX
Rear
n
etaining Wall
Heights
c) Debris Flow
snlpEU 6ururnl
e6e:eg 7 6u;rye6
sesuel
s;1e11 6ugurelag
iJaors l ep",c ers
' l3p1""ruoc ebereg
-, . .salqoole.E.l
qqeo
(,,y) sbueq:ano / se^Ef
r--.-i-i:L
.:'rr-i...'l
A3AUnS I
snoSNv'1'l33sil,lt D
NVld SdVCSONV'] tr
sNv']d uoo-]1 I
' :ti "-: -:. "- ' .'eDeJolS tr^ous '' ;-?1 r' .j '! i.' '
(eperb pue ssecce) Iennanuq
:.' :;
I
suollsrJlseJ leld
secueuen
.' .
-'ls$o,plrroC /.y\en'l-----------'i
{punororspun) sell!Mn
' uollEc!#en'o'c
se;dues lepelPtu 6urppng
elrs Jo soloqd
' ; i "'urjol uorlecgr.ran ,!11111
. rn.-'?."'-r
sae;1 pasodo.r4
saa4 6uq1srx3
r.lclrd Joou
slElrelPyl / roloc
nH3
acedg c;11y 7 ;mel3
vlue) lPuolllppB 092
vluc
elPcs
a.
sIsEqles
slueuqceorcuS
1q61ap 6utpltng
elms
NVld 3IrS
guolle^ale todS.T
' :r'.'-'
suorlE3ol Alllln "
;
D
: l':(.
elecs
sNotrv S'r3 9NlollnE !
seeJI
spJezeH lElueuuoJrAuS
Iceqlas esJnoc JaleM
u1eld poog'r^ 001
Iqdet6odol
slu€uesef
Barv alqepInE
ezrs lol
uogdpcsep 1eba1
ls!lloeqO Ma!^eU u61seq
elees
:lcefo.rd
,GS5
/ --{rchttct I
,..Zonc disu-ict
i' Lot sizc
Total CRFA
t55/
zoivtE CHECK
Pbonc
Pbonc
kogoscd,usc rz'zyto ,c -
Buildablc
Propbscd
---;----r
lzI_
0
+
+tl 2*do ro
Allorvcd Existine Total
6 yr6oRFA---.----+(lzr11uor.1- fu+Z -
+ 675 = 42j crcdit plus 250 addi
Docs rhis rqucst involvc a ?50 Additio n? N 0 ,lh
ddrIory
t///t
Horv mueh of rbc allorvcd 250 Addition is uscd rvirh tlis rcqucsl?_
ffiFFi:riagd;:; I
ffiss*t
&tb:elis:ritt* r Fronr .,, 20.
Sidcs ..15,
t5'
l\t IA. ..H_r1f rr
r.uw&_
rtoiz
Landscaping
Rcuining \Yall Hcights
Minidruil
3'/6'
nquir"a Lf
Cangc Crcdit
Drivovay
Conrplics wirh TOV Lighting Ordinancc
Arc 6nishcd gradcs lcss tlan 2:l (502")
Environmcn ta l.&Iazards
b) Rocldall
Pro.ious conditions ofrpproval (cbcck propcrty filc)
ls thc propcfty non-conforming? Dcscribc:
-+.', ,/aZ'-/5/1
@
lL0 ;l
c) Dcbris Flov
Pro.jcc| _
DESIGN RXYE }Y CIIECKLIST
. Q SLIRVEY
.. :. ;ii. -1 Scalc
__ Bcnclunark
t ___ Lcgal dcsaiption
: ' .E/,,. -, lotSizc, i &y'Q,
Bujldablc Arca
.. - ./-:._:__ Eascmcnl'l. ! A-K_
/,.,,#/.2
*
.
- Topograpl y'.* Z:y'
rbeck U{L
. EnvironmcnalHazrrds
c] qrTE P!.,1,1.r
--- Scalc
.- BuilCi,rg Hcight
-.
Sctbacus y'-fr
,$
Gangc conncction
.r.---. r. Sitc Gradc\Slopc
ot
-
Rcbining lValls
Fcnccs
' parking/Caragc
' Tuming Radius
Drivcrvay (acccss and gradc)
-.
Snorv Storagc
-
Firc Acccss
-r* IOO yt. nssa plr;;1t g .4
clcvations
MISCELLANEOUS
__!_ UoDdo Approyal
' -
TirJc rcport (A & Bj
C.O. Vcrification
-- Sun\Shadc Arglcs
.--'.'.-i:*Vlili6ii(trrgcigd6F
--- Viov Qs;d6srs
Varianccs
Plat rcskictions
tr FLooRPLANS
Scal c
,,. tiilnt
_- .2i0 additionaj CRfA
_-. Crawl\Aftic Spacc
EI'I T
,7
r/p/ 4/a/aAt
Existing tccs
Plotos ofsirs
'fiE*
;-ruI
'eEifr;efri !:I i +B EII 'iJfr iFitiE e*;
I
a +€r: -+;IiT T
Z ]--r:--f 2 ---
icFgni,iFi
-_> i i \6-.-.,= | I -Hi
flg
t:
:
f,
E
e
5
2
E
F
I
df,f;n*=
f;tn
E;g "ai
I
7
I
TF
n8 !l
nts
!F'
:60
lq oe rl *r ;i
,
EEfi
H53
EAi 5P';
EE
\ "a*
T'N
-,n \
\)
\)
l-tr
U
O
A \J (-
U
\\--o SC\ex
F-
x r-tt
:=\ Ir\d u'l
z.-o
O)nr c\(-
i\
\It F
n \J
^
liiH
il*1q ldsp
iq *
3
f;6f;9
ISEE
E:;
iE!I ir h,i
?
o :
3
i
5
*
z-n
4t
I
CHRISTMAN / ROTHACKER RESIDENCE
3944 BIG HORN ROAD, WEST UNIT
vArL coLoMDo 81657
I o -{
o {iiiii
-----
.'*
E;Hf;;I;
il
;F;
t_\e*
I r.'A\J
\J \\
l-n
U \\r\o \)z f1
\
\l \)
^-- (--
a:: :-
Es-2
iEfF
'iEEiulii!
EiiiIiEiis
>(\-'i
\)
\Jr
I-II i*i
a
h
r-1
J \)
\l
^
ii&x33:l>N-+irir:.i,;r'-
EfrgfisEEfi8
'gAEsqH$E ' rHiirpe !!599!tEi 69339 +"J 2 zz =4 tr -:ii -o f, 8p r ,ir > PX eo >_z:ai
ZT
iz
CHRISTMAN / ROTHACKER RESIDENCE
3944 BIG HORN ROAD . WEST UNfI
VAIL COLOR^DO 81657
rl )fl ;|i ; t{s jgl c!, ii,iut tz
,/ (j. z
UJ o ard
lt,-il tu I \.)
r- l]-
Oz l| s<|| sQf
P:q I O O..r li zzu
tl tl
tl tl
ll tl
t(\
4t-utt
F., iii 3t<,6<-_o-
>q?(+i
b,n;
t--ffi_-l
ai9l I
--T -ri .- -1r
l
..i
1
/:
xl E dd
t'l
ruilr *-.Ea a>R ,-- u_
nnfi r--r O Li:-:
.c (J Z \JH
=fl|lt u F
a-=:=-;=:--:a I r- r L-------r
x.
'<".I
UJ r
,t-.
u-
{
U
rf
o-I[.
z.
vu-
<16
0i5 $dk
,.', o n Z..f);
F 6 ..fi v+? roF
FNI <O 66P * u.r'av* i2 es: <Q adP ='H
i u$$ i- d (\ F 7t- ,,n z '62<e i y9Hi5
<zUi;ilv1.,'rt <5< dn9<d
$$! EEi!$
EKp E:fie$
B
K I
z
2
J
lt o z
=o
t--
cr
UJ z z
1t {
1- il
a tu o
\tJ
:
rtl (]{{
|r)F O .oT.. F Fo!-
{JJ<F
,il'iE>5 *>ofi*
<q<-uJo
9)iH5?
)
"7 -vt
.N
ll'IL
tl tl
tl
tl
------z\-
o
!
o
t=bf
L! tl
I
I
I
I
I
I
o 7
I
I
/R)\l3F l/
G \p
IJ l{
\t\ ;t\u \,'@'.
r=r-_-=\l-l
ull \-.. E a
-Gl/-
:-:::= li
tlrf! i-r O
rr\ (J Z t!, lrl e-
F-"
I t__J L
@ 60
T.
:!
f'
{a.
z
,o
Fif; 9
iT"? 5
F!f;$
$ f.:
?v
o ll H * ll * _o | |i | ,l rJc r€q
''
--1'
I i e.!(i(i,
"tl Fz ,4.4 IJJ -t o od
I
r-
a.l
a.)F_
el cv
IJJ .'1-
ll
l- .. l.l
..{
l!--"', - -..
H
tr
g
AN
tr I n 9tO t t*H$E b kER6<fi =: i E ;: JiE I
=
F .(, J J 50 -F<---l q :6u6 A f S$ fi$H
= -o o ( x * lrl" i o E ; F 8=
:I ;0.
6
6
'It
H
^l
B
od
a.l
I
;>
€o :\o >.lf
3Z EB
F 7 D
Fl Fl
B
z
U
rr l N F
E
o.l
;
,&o
'
l-
.!
z=
FS
z.R
.5
-c
fo J E-J -Pi
:w!4 t(g V 5?
bJ Fe,l x<M-
r r'l
F
ir
''LLI
ll tl
Jml
9 VUi
I N'
I
z
4..
j
-, t-
(.)
u0 (l
c.l
I
>to
'9 e.'i 6b
E9 E>r>tr;^
o a F
.El
E tE_.j
c.l
o
J c)
F
F
B
$t
oo
F
o
'a
'F
M
't
t.-
C.t
()
bo
l-
c=(\J
N
5 zq
3s$il
iH I $
iiE r
:H.t:
$$f$
H"rg
E
0.
00
a
'd v
oo
*B #a
z-
E+E>E}EA
F z
^
Fl
'-l
ts
rr'l z rr'1
fYl
(,
U)
ro (o
F
F
,a;
C)
J
C)
''B
f?
6)
'7
zE og
FA
=:
=E fr-
-tO r'F
-t .:\->XP rdE t- _x I u.,l
M n
Fi
)!
a'-
f
l1
\
\
,
orl n
I
i
I
PROJECT TNFORMATTON
PARCEL NUMBER
LEGAL DESCRIPTION:
CLASS OF WORK:
TYPE OF CONSTRUCTION:
TYPE OF OCCUPANCY:
LEVELS:
HEIGHT:
PARKING:
FIRE SUPPRESSION SYSTEM:
CURRENT APPLICABLE CODES:
2r0il il040t2
LOT 7E, BLOCK 0471,
LANDMARC TOWNHOMES PH I&II
RENOVATION
TYPE V.B
R-3
3
32'- l l"
4 SPACES
NO
lRc 2003
tFc 2003
VAIL, CO TOWN CODE
AREAS LISTED BELOW ARE COMBINED FOR LOT 7E AND 7W
BUILDING LOT SIZE
SITE COVEMGE:
LANDSCAPE AREA
IMPERVIOUS AREA
GRFA
0.6t ACRES (26,554 SD
3,504 SF (t3.2% OF LOT)
NA (EXTSTTNG)
NA (EXTSTTNG)
3,785 SF (UN|T 7E)
3Js4 SF (UN|T rvv)
7,239 SF (TOTAL GRFA)
LOT 7E GROSS RESIDENTIAL FLOORAREA CALCULATIONS
FIRST FLOOR
SECOND FLOOK
THIRD FLOOR
1,793 - 600 (GARAGE) = 1,193 SF
1,474 SF
r,il8 sF
EGrEIlv/trIil
ocT 1i2007 a
l-owN oF VA|L
E
[]l
TOTAL GRFA 3.785 SF
Sent 8y: .KCC;9703260566;0ct - 2-00 8:28A1\4;
Developer agrees to establish a cash deposit wilh the Town of Vail rn a doltar amount 0f $-2,1-0-Q-
-(125%
of lhe rotal cosr ot the work shown bolow) to provide
s€curity for the following:
tMeEgVEv'eNI
Re-vegetate Site. $ 2,000 per K.C. Company
).ts
P.1g e 2
WHEREAS, rhe Developer,as a condition of approval-ol{hq Clear and Grub the site
- - ?flt*:d -- --::::::::::; I €-.-, wish es ro en rei in io i oruero pffi"nt Agreement;and
wHEHEAS, tho Devoloper is obligaled to provide security or collateral sufficient in the Juogm€nt ot the Town to rnake roasonable provisrons lor compteiion oi rertain improvements sot torth below; and
WHEHEAS' the Developer wishes to provide collateral to guarantee performance of this Agreemenl. including construction ot the above-refersnced irnprovements by means ot the foilowing:
i#uil
DEVELOPER ITIIPFOVEMENT AGFEEMENT
THls AGREEMENT. made and snter€d into this _l p_riday of oerober -6i 2000
!V-119gmong NicholF ,/ Lorrus _(hereinaftercatreOtrre ;0"*ro;AFprn61;;i6"fr,t"
OFVAIL (horernaflercatteOm- "fownfaqd:_------ ___fttereinaftercalled
fh+rBank')-
''WAIL\0AYA\EVERYONE,FORMS\OtACASH.OOC
loi4
-r$v
Sent By:. KCC;970S260566;oct-10 8:2sAM;
NOW THEREFORE, in consideration of the,oilowing mutualcovenants and agreernents, the Developer and the Town agree aS tOllowS:"
1' The Deveropor agroes, at the sofe cosl and expenses, 10 furnish alr equipment and materialnecessarv to pgoilr and cornpLte allimproverrientr]onl, o.ror"July 15,2OOl* '
_.TheDeve|opersha||.comp|ete,inagoodworkman|ikemanner'a||rmprovgm€nB as lisl€d above' in accordance with all plans and specifications filed in the office 0f the community Devslopment Departmeni, tne Town ot vail, and to do altwork incidental thereto according to and in comptiance wiln itreiottowing:
a' Such other designs, drawings, maps, specifications, sketch€s, and other ma$er submitted bythe Developer ro be approved by any of the above-rereienceo "-'
govsmmental entities' All said work shall oe ione undei the inspecrion of, and t0 lhs satisfaction of, the Town Engineer, ne fown Auihing Official, or other official from lhe Town of Vail, as aaiected oy specii osiricts or' ssrvice districts,as their rsspectivs interest may appear, ani shat nol be oeemed comptete unril appr.v€d andsg:?qr?d as comprered bv rhe Town ot viir communit),'
-'- - '
Devetopment Department and public wi*s o"panmeni'* rf buildinq oermits have nob been issued and cons. has not commenced 2. To se'cure anO guaranto'd pirroi,nanre of its obtigations as set forth herein, the Developer agrees to provide sicurity and cottaterat as ,ollows:
A cash deposit account in the amount of $ 21 5oo to bo held by the Town,as escrow agent, shall provide th€ security tor tne imprwernen6 set forth above if there is a default under the AgrsEment by D€velopsr.
3. The Developer may at any time substitute the collateral origin2l;y set forth abovo fOr another torm of collateral acceptaoteio the Town to gua;anre;it'i'r"itnrur comptetion ol those improvements reterred to herein and th€ pertorma].,ce ot;; i;;; or this Agreemenr.Such acceptance by the Town of alternative coilaterat strall be at the Town,s sole discretion.
4. The Town. shall not, nor shall any officer or employee thgreof , be riable or responsible for any accident, loss or damage hippenrng or occurring to rh€ work specified in this Agreement prior to hs completion andlcceptance-ot the sameJnor shail the Town, nor any officer or.employoe thereof..be liabie for any persons or property injurgd by reason of the nature of said work. but all of said liabilities shali and are hereby assumed by the Developer.
The Developer hereby agrees to indernnify and hold harmless rhe Town, and any ol its officers, agents and employees lgainst any losses, claims, oamagea oiliaoitirie" lo which the
Pirqe 3/6
F:.,EVERYONE\FORMS\OIACASH OOC
I of4
qorrt Q\r. |.nn.
:
9709260566;o.Uo 8:2sAM;Pirge 4i6
Town or anv of irs orl"-ri1 l.g?ljs or emproyees T1-|ryr" subjecr ro, insofar as anv such losses, ctaims, damag-es or liaOitities 1or iciionsm respect thereof) thal anse out of or are based upon any pertormance by me bruefoper hereunder: and the Dlvebpor shalt reimburse the Town ror anv and.arl199ar oid.ilffi;ires reasonabry incurred by the Town In c'nnection with investrga_tin_g,o,r detendnii"}, such ross, ctaim, oamage, riabirity or action.This indemnity provision snat be in aooitii,iio any other liabirity which ths Deveroper may
5' lt is mutually agreed that the Dev-eroper rnay appry to rhe Town and the Town shall authorize ror partiai taeir. or in. iorr.r-rrra oipositel iliihid; iown.ror each category of rmp/0v6/henl at such time as such improverent, arc consrrucieo in
"o.puan." with a1 prans and specifisarions as reterencod here'i,i,iJi'""0
".cepred
by rhe Town. undor no condirion
;Jl"i,:,:iffi TiJlilfl Hij",
in"i ii n.i'ir
-nero
oe i6o;il ;"ro; il; amounr necessary ro
6. lf the Town determines, at its sole discretion, that any o, lng improvernents c.ntemplated hereunder are nol constructeo-in_compliance with the plans anq specrfications set torth in this Agreernent on or before the o"t"-rrt tortn r; p"irgr.l;-Z, the Town may, but snall not ba rsqu;7g6 ro, rsd€em rh€ lefter of ,r"Oir as n€cessary tb comptefe the Unflnish€d mprovemens. The Bank shall retease suitr runds upo, ilF; *qii,ii from rhe Town slating that the impr.vements
1Lv.9not or* ir'i,ir"tlo as required by this agreernent. The Bank shall not require the concurr_encsof,the Oen"fop.|. prior to retedse of t6c funds to the Town nor shail the Bank be required to verify indlpinie-ritry rnat such improvemenrs have not bsen
;il91"[:"X.rrequired bv mis asr6em"'ir, orifnirr .ereise ,rJn;Jil ;orery upon rhe rown=s
ll the costs of completing the work excesd the amounl of the deposit, the axcess,t.gether with inrerest
"l,t*ql.u"
perce.nr p".innrr,^"ha, be a rnn alirist rhe properry and may be coilocted by civit suit or may oe'cenified to rhe rreasure, orEalg[ county to be colleded in the same manner as ditinquent
"d y1lglr, taxes revied against such property. rf the permit holder fails or refuses to cJ'ipr"t"lie cbanup and randscaping, ad defin.d in this cnapter' such fairure or rerusar shafl be considered a vioiation oi tr,*iSning coou"
7 ' The Developer warrants alt work and material for a period ot one year alter acceptance of at work t:rr:!Jg in thrs Agreement by rhe Town if 6uch work is rocated on Town ol vail propsrty or witnrn rown or Vai.iiiht-ot-*"y puftruad to sectron r 7,10.250.
I. The parties hereto mulually agree fiat this Agreement may be amended from time to time' provided that such amendmirrG be in wrning and executed by a1 parties herero.
F.\€VERYONE\FORMS\DIACASH,DOC lrrf4
Dated the day an( year tir5t above
STATE OF COLORADO
COUNTY OF EAGLE
ss.
/-J!:JT, ffitil,?ntf1w,
Witness my hand and otficial soal.
My commissio n exenes '^L,t;o/t
., / /B -Ca
I this ^tittpl //' ( t/ at
srATE OF COLORADO
I
couNrY oF EAGLE itt
, - Inr ro.reglils, Devel0per rmprovemeil Agreement was ackrrowledged before me thrs , ;-_day ot AC,tOta er E;On-
Witness my hand and officialseal.
My commission expires:
I ri I
w,!,r-
d before
Notary Pubtic
F:IEVERYgNE\FORMS\otACASH. OOC
.f rrf .l
oct 03 oo o2:itep
J""u"
?18 0?70
Ifoilywood Services, Tns.,
P.O. Box 4901
Vail, CO 81658
Phz97O-74E-O725
Faxz 97G748-0770
ESTIMATE TO: KC Company
FAX: 479-6668
ADDRESS: Lot 5 Filing 1 Bighorn Sub, 3g4Z Lupine
TYPE: Re-Veg lot with native seed.
BID: 92,000.00.
NOTES:
p.l
RECEIED
sEP 15 2000
6$rrrilFRN {lR0Design Review Action Form rownffi! TOWNOFVAIL
Project Name: Darby Vail II project Number: prj99_021g
Project Description: new two-family residence
Owner, Address, and phone: LoftuVnichols
1200 17th St. Suire 890
Denver, CO 80202
303436-9393
Architect/contact, Address, and phone: The Mulhern Group LTD. (Attn: Roger white)
1730 Btake st. sutte 435
Denver, CO 80202
303_297_3334
Project Street Address: 384? Lupine Dr.
Legal Description: Lot 7, Block l, Bighorn Sub
Parcel Number: 2l01lll0200l Building Name:
Comments: Mulitple hazard zones
Board/StaffAction
Motion by: Bill Pierce Action: approved with
Seconded by: Merissa Greenauer conditions
Vote: 5-0
Conditions: l. Army corps permit at B.p.2. Tree mitigation req.d
3. Any areas labeled as "crawl space" must be <5 ft. head height and access panels < 12 sq. ft.
Town Planner: Allison Ochs
Date: March 1,2000 DRB Fee paid: $200
Project Name: Darby Vail II
Documentl
,i otZ or9 .o o-
j
olD .o
!{
A
FI
9l(a tR H EP >UA H
2d <tE tt x
2h, ti <O c)E-
:8 tr
d
tr
fl
-2
40 tr (J o li F.
ogl zo
EB
H
F
Y I
c
lt
E
U
(J
E{
(9
2h
EO ptE Era
e li
3{ El 2Z
-o F:
t, l.az {p rO HT
I
FEr AZ rob oo AE g(
ltl
F.
rt
A h
o
x
I
er
HC IU {o zuI o
g
E!4 o (,!l ? fra (/) t(O
()o
a
F gt
A
F
I t'l
z
!l
FI
A
'.1
C'n ->
!0 > q.l 0440 4E
!ao I xd o
TO['NM
Design Review Board
ACTION FORM
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2139 fax: 970.479.2452
web: www.ci.vail.co.us
Project Name: Darby Vail II DRB Number: DR8010133
Project Description:
New Single Family
Participants:
OWNER MNDY NICHOLS 05/25/2001 Phone:
License:
APPLICANT The Mulhern Group, Ltd 0512512001 Phone:303-297-3334
1730 Blake St. #435
Denver, Co
80202
License:
PrcjectAddress: 3847 LUPINE DR VAIL Location: same as above
Legal Description: Lot: 7 Block: 1 Subdivision: BIGHORN 15T ADDmON
Parcel Number: 210111102001
Comments: change from approved P/S to SFR
BOARD/STAFF ACTION
Motion By: Bill Pirece Action: APPROVED
Second By: Charles Acevedo
Vote: 5-0 DateofApprovah 06/131200l
Conditions:
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the Design Review Board,
Cond: 0
(P|-AN): DRB approval does not constitute a permit for building, Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: CON0004800
That on the SOuth elevation where the decks previouslyjoined, there be no stone
above the wood shakes
Cond: CON0004801
That on the South elevation, the "flying fascia" be returned to the orginal approved
building permit plans
Cond: CON0004802
That the applicant submit a new landscape plan to Town staff for approval
Planner: Allison Ochs DRB Fee Paad: f2OO.OO
w "ihri4
DESIGN REVIEW BOARD AGENDA
Wednesday, June 6, 2001
3:00 P.M.
PUBLIC MEETING RESULTS
PUBLIC WELCOME
PROJECT ORIENTATION / LUNCH - Community Development Department
MEMBERS PRESENT
Clark Brittain
Bill Pierce
Hans Woldrich
Andy Blumetti
Charles Acevedo
SITE VISITS
MEMBERS ABSENT
11:30 pm
l:00 pm
1.
2.
3.
4.
5.
o.
7.
8.
Driver:
Weiss residence - 3838 Bridge Rd.
Darby Vail ll - 3847 Lupine Drive
Edwards Medical Campus ( to look at cemplank)
Hobbit Hill - 1546 Matterhom Circle
Northridge Condominium s - 2437, 2439, 2447 Chamonix Lane
Lionsmane Condos - 1063 Vail View Drive
Riva Ridge North - 133 Willow Road
Joe's Famous Deli - 220 Bridge Street
Allison
PUBLIC HEARING - TOWN COUNCIL CHAMBERS
1. Vail Valley Medical Center - Final review of proposed Phase I additions.
181 West Meadow Drive/Lots E & F, Vail Village 2no Filing.Applicant: Vail Valley Medical Center, represented by Braun Associates
3:00 pm
George
2.
MOTION: BillPierce SECOND: Hans Woldrich VOTE: 5-0
CONSENT APPROVED WITH ONE CONDITION:
1. That the mansard roof be extended for run-off conirol.
Lionsmane Condos - Repaint.
1063 Vail View Drive/Lot A5-1, Lion's Ridge 1"' Filing.
Applicant: Lionsmane Phase ll Condo Association, represented by Anigoni,
MOTION: Bill Pierce SECOND: Charlie Acevedo VOTE: 5-0
Bitl
lnc.
APPROVED WITH TWO CONDITIONS:
the buildings be painted with the following paini scheme:
Walls - Dry Dock SW 2022
Trim - Castle Beige SW 2025
Facia, Soffits, Railings, Doors, Concrete driveway walls * Thicket SW
2027
appropriate trash enclosure must be constructed and painted to match the
facia and soffits.
J.Condominiums - Repaint. Bill No
2437,& 2447 Chamonix Lane/Lots 23,24,25, Block A, Vail das Schone Filing 1.
Appli Northridge Condominium Association
Bill Pierce SECOND: Hans Woldrich VOTE:5-0 MO
coNs APPROVED WITH TWO GONDITIONS:
the buildings be painted with the following paint scheme:
Siding - Sand Castle SW 3006
Facia - Greenbrier SW 3050
Soffits - Orchard SW 3036
Window trim - Navajo White SW 3005
Hand & Deck Rails - Greenbrier SW 3050
Chimneys - Navajo White SW 3005
2. An appropriate trash enclosure must be constructed and painted to match the
building soffits.
4.Hobbit Hill - repaint of condominium complex
1546 Matterhorn Cr./Hobbit Hill
Applicant: Eagle Eye Management
MOTION: Clark Brittain SECOND: Andy Blumetti VoTE: 5-0
APPROVED WITH ONE CONDITION:
Weiss residence - Conceptual review of proposed addition.
3838 Bridge Road/Lot 12, Bighorn 2no Addition.
Applicant: Steve Riden
CONCEPTUAL - NO VOTE
Vail Village Inn - Conceptual review of a remodel to units 335 & 337.
Allison
Ann
Brenl
1. That the colors be reviewed by staff in acoordance with the direction of the Design
Review Board.
5.
A
100 E. Meadow Drive #335 & 337 - Vail Village Inn / Lot O, Block 5D, Vail Village #1
Applicant: Patricia and Gerardo Schroeder, represented by Fritzlen Pierce Architects
CONCEPTUAL - NO VOTE
7. Darby Vail ll - Proposed change from P/S to SFR.
3847 Lupine Drive/Lot 6, Block 1, Bighom Subdivision.
Applicant: The Mulhern Group, Ltd.
MOTION: BillPierce SECOND: Charles Acevedo VOTE: 5-0
APPROVED WITH THREE CONDITIONS:
2
Allison
1 . That on the south elevation where the decks previously joined, there be no stone
above the wood shake shingles.
2. That on the south elevation, the "flying fascia" be returned to the original approved
building permit plans
3. That the applicant submit a new landscape plan to Town slaff for approval
8. Golden Peak - Conceptual review of proposed entry addition Ann
458 E. Vail Valley Drive/Tract F, Block 3, Vail Village 5'n Filing
Applicant: Vail Resorts Development Company, represented by Patrick Hirn
MOTION: Andy Blumetti SECOND: Bill Pierce VOTE: 5-0
APPROVED WITH FOUR CONDITIONS:
1. That the stucco arch piece be removed and replaced with vertical siding to the
underside of the dormer roof.
2. That the stone pillar be terminated with a stone cap and post.
3. That windows adjacent to the entry doors shall have the same trim treatment as
existing windows on the building.4. That proposed lighting be reviewed by staff.
9. Information Update
. June 19rh roofing materials discussion with the PEC, Town Council, & DRB.
Staff Aprovals
Zopf residence - Roof replacement. Brent
894 Spruce CourULot 9, Block 3, Vail Village Filing 9.
Applicant: 894 Spruce LLC
Tyrolean Condos - Replace concrete driveway with heated pavers. Ann
2648 Arosa Drive/Tyrolean Condos.
Applicant: Ben Tobin CO LTD
Lodge at Lionshead - Replace two exterior doors with windows/window addition. Ann
380 E. Lionshead Circle/Lot 7, Lodge al Lionshead.
Applicant: B&C Properties LLC
Schmidt residence - Changes lo approved landscape plan. Bill
1410 Buffehr Creek Road/Lot G-1, Lions's Ridge Filing 2.
Applicant: Leroy S. Schmidt
Angelo residence - Addition to an existing dwelling unit. George
352 E. Meadow Drive/Vail Club Condominiums.
Applicant: John M & Judith H. Angelo
Golden Peak Skier Tunnel - Fill storage. Brent
458 Vail Valley Drive/Golden Peak.
Applicant: The Vail Corp.
Vail Clothing Company - New sign. Allison
244Wall St./One Vail Place Condominium.
Applicant: Intrawest Retail Group, Inc.
Linn residence - Driveway entrance piers and exterior lighting. Brent
1350 Greenhill Court/Lot 14, Glen Lyon Subdivision.
Applicant: Alexandra Palmer Linn
Walker fesidence - Reroof. Judy
5089 Gore Circle/Lot 9, Block 2, Bighorn sth Addition.
Applicant: Steven A. Walker & Lori L. Walker
McLean residence - Entry deck, stair treads & railing replacement. Judy
2821 Kinnickinnick Rd., Unit A1-2lColumbine North.
Applicant: Gordon A. & Heidi P. McLean
Tanka Corp residence - New dormer, addition and balcony extension. Allison
600 Vail Valley Drive/Northwoods Condominiums.
Applicant: Tanka Corp.
Austrian residence - Change to approved landscape plan. Bill
696 Forest Rd./Lot 8, Block '1, Vail Village 6th Filing.
Applicant: Neil R. & Nancy R. Austrian
Okubo residence - Revisions to approved plans. Bill
5027 lJte Lane/Lot 31, Block 19, Vail Meadows l"tFiling.
Applicant: Larry T. & Renee Okubo
Dreyer residence - Change chimney cap to copper flashing. Allison
5114 Grouse Lane/Lot 6. Block 12. Gore Creek Subdivision.
Applicant: Raymond & Margarita Dreyer
Cascade Resort - Street banners. Bill
1300 Westhaven Drive/Cascade Inn.
Applicant: L-O Vail Holding Inc.
Columbine North - Replace deck railings and pickets. Judy
2773 Kinnickinnick Rd., Bldg. B&D/Lot 4, Block 4, Columbine North.
Applicant: Jeffrey Rodeen
Passages - Extend existing window out 6". Judy
201 Gore Creek Drive, Bell Tower Building/Lot 3, Block 58, Vail Village 1s Filing.
Applicant: Peter Apostle
The applications and information about the proposals are available for public inspection during
regular office hours in the project planne/s office, located at the Town of Vail Community
Development Department, 75 South Frontage Road. Please call 479-2138 for information.
Sign language interpretation available upon requesl with 24 hour notification. Please call 479-
2356,Telephone for the Hearing lmpaired, for information.
a/a
"ro 26-Oa +'I
r0[ft
06, rt' rioi. tov-cotr-l oE"r.t o,l"ia 7tt|.l?
TVFES OF IIIPFOYETENTS
Fenco
Wall
1-9n4e639lrrg - X
TOWN OF VAIL
APPUCANON FOR REVOCAELE PEf,MTf TO
EREC? OR MAINTAIN IMPf,OVEMIilTS ON A
PUBLIC RIG}IT.OI-WAY
aE&l9s!LCAU!9r.l!E-!EDgcEP
(Pl6aE€ tvPo o( Ptln?)
OWNER OF pROpERTY iirov xrcxorlrn ldtrur Aoon€ss aii
LEGAL OESCR] TON OF PBOPTFYY TO BE SEFWED:
Lor ? aLocK r -grilorx gu-lourgpil rtRsr AootTtoN-
(rt ncca.ray, rFh d.rcttFlloo m ttp.frF ahGal).
Cornor lol Inoida toi_
Othet -L
Dh,IAILEO O€SCRIPTTON OF STBIJGTURE OR ITb,M(T)INTO HIOHT'OFWAY:
-il-Co."rrclon ot t 2' wr<to ccrarl d6ciy dlh r '' cofttr13 gai
'rd
| 24 mElnun rynhg -
b Luplna dn\,c,
z codrneo.gl-:2 wl6. co,rctatt dtrYGYf,y with . '' cotE {. 9rn rnd ' L' mdlrum onhc
|o 6nder Roao I ili .,iJ.Jn-r, dbt lh R'O.w. E .nrr,r. 2go' rrrobilcg
'lL
obFna {bt wiox'
flg.r rFwfulr pilronlty rdrt? -T6
Proposed datr lgr comrncnortn nt Of Conrtsugdon-OCCEMIIR2000
h con3id.?a on ot th. ifsuancc of e orocebb Dcfifit tcr |ha aln cn ar abow indicflcd'
oodlctnt .grr.9 es foltows:
1 . Yhrl lhe 8ltucture he ?.tn ruthorirad on e tErocabL padnii brsls It rc3ltclsd
ercluclvely !c tho land rboi,| dascrtd
2. That lhe p€dnit ir lhltad tpocllhrb f/o tho typt ot ttruclufo Ceictibod in lhls
aP9hca[on.
3 That lhe appllcr^t shall rrohly lh. F?oloct Ph t|. ind Publla Wottt
Daprrtmcfil, or lhatt duly Euthorltad aggnl, twc^V-lour t'tourt ln rdvtnc. ol lh.
limc lor commencamanl ol conStftdlon, rn order thal P.ltpar inspeclbn may b.
made by tlu Town.
L The applictnt aom.. t6 indefinily end hold hatmless lhe Town ol Veit, lte
olllcera, rmglsyelr .nd roo^t! rg.htf rll llabxlty' claimt rnd cle|nmdr ott
rccounl ol i^lury, lo|| or drmr{n,'lttludtng v,rldrou, u-oautr 6rtni anJ g f?o"t
bodily injury. p?Bonal rniuty, skkna3t, dheerc, dea|h, proprrly loss of dunagf .
or e/yy gth.r lom ol any klnd rrtratrocrer, $tich ed,r€ oul ot ot are ln any manntr
corrrtae|d u,lth cgpllcant'r octlvlllc. plj'lu.nt lo lhlt potmit, if rrrch Inlury, losr' ot
demrgo ls caus€d in who|a or h 9|n by. o( il clrlmed lo ba clu3ad ln wholc ot tn
pan by. tFa rcl. onrlrrlon. at?ot, p'rotesslonal olaor, mldrkc. nogligcnca of olher
laull ol tha applicent. hi3 corllttcto( ot subcontrectot o, Rny ol?lcer, entpbycl ot
rogfctCntotivr ot the oppllcanl, h3 @nlraclo( or hit bconltactor- ?hr lgDllcNnt
aora0 to InvrEtlgatc. hrndla nrpond to. rnd to provlde dolon86 lof tnd delglxl
ogarl!1, rny auch llaullty, clalm:, or dorn.n& &l tht 3ole orpant of lhe
agglicant. Tho apdbant llao caraca to balr oll erponses rrl.lktg llrr.tto.
Includlng cou.t 6orla ard rtlotnry'r lctr. wh.lh.r ot hot rrry r,ch litullty, d.ltn3,
o? demtndr slleoed tr g?oul'dcrl, ttlla, or lraudulc.rt.
zo'd 60zz r5Z EOE snaJro-]€sLoL{3!N d99 : IO OO-9O-f,aO
. .. ,;-.L .. '.t Fioi'lo.r..o,.-o.ftt 'f r..r r,l
5,
6.
8.
lo. ita. ra ta Sl
Afrolictnt .gf?cr to pfoc{rr and mthtalr, et ilt orvn cosl, I polfcy o? polhl.r ol
lfttuttnCa euttlc|.nt lo .nlura rgdtral tll f rbillly Clr|mt, d.ftrnda and olhc?
oblhruona lrau,n.d by rha apprEaht purr|,rnt lo thlt P.rre.lpn {.
Applicentr ludh.r ogfitr to rrht.c thr Tora ol Vrtl, ll| oflhont, rgant! ord
,mployc.. hmr eny .od rf llrbltlly, C||trht, d€rnrrdr. or adloru oi c.u$t ol
rc$ona u,frft!ilv.r l'lrlng orrt ct rny dcnragf, lorc or hfury lo O|. rppt|cint or to
lh. egpllcant'r oiop.rty clrtad by tha Town ot Val. ,E olftc.rs, eoenti .nd
att\oloyfar wtllb mgngad in malntanlma or aoor., rrmovll rctlvitirt or rny otha?
actMllor whrboava? on Town ot vtl prcprfly, rtctr, ltdcrrlkr, or rlglrt!{j.
wey.
Thtl lhc pormil ntay bo ratdcd *ftcno€r n h dcttllilned that $r .
Cnctorcfvnanl, ob3kvctloit. Ot Olher alructura Conrtltuasr a oul nc!, dctlroyf gr
. |mprio lhc ulc ot iha rifr.ohwrl, by lha publb. g9.lrlttutar I lraltb hasard, o.
tlra proo.rty upon whlch l?E .ncroadwrnt. ob.hucllon, ot ttructufc crlrti f.
r.qulrad for Ue by fia pubic; or tf miy ba rovo[qt at rny ilmi fgr rrty ratton
'daomgd tulticlail by lh. To.irn of Vrl,
Thrt lha lppflc|at w|n r.mq,ar al hb a!p.nF. thc rncrorehrn nf, obctnrciloo, or
Dln lCIJrt wllhh lan d|y! rR.r.eceivirg nollce of rny nvocrtlon o,
'r|(| ta.mlt.
Tha! lht rpplic.nt a0r!65 lo mrintrh any land!6.pin€ rsocirtcd wtth thr
encroachrntnt dr lh. rbhl-ot,r,|y
'rhel ln the ovcd srtd rcmoval of fic Incronchmfnl, obtrruc(lon, o? ltrutclur? B
^ot rccomptbhod wilhln l.n drF, th| YOrn la hfobt euthorhrd lO l.'ft.t't vc
ra,ro rr.td haw tho t|oht to matr rn tt!.esmrnt rgdnrt lhe promny rnd r!firCt
|ha collt or rrlmovol in dra i|rna mrrnar aa gonanl trra! ara cotbcied.
Thrl ht eoplbrnt h|t |;ad crrd undorrlrrs! !il ol thc tcrms .nd qo.tdltlonr lat
todh In rhi. .p,plhr0on.
Rrcodlng Frl lor FcvocaOh Ri/rlof-wry permll ts f .t0.@ and 35.00 tor cvany
pagn ihf.iftrr. trkr chrckt FyrU. lo trglc County Ctfrt rnd Rrcordri.
Speclal condltlons.
-!9xE
L
10.
l!.
tza eo
Drtr , 4 #eu
Prolact Plann.t
Dtpertrnenl of Publlc WorFt
pw,for|tgr.rrttvocrl'tov ooc
llvt3GD r/r*tdg
_ _ .Fo'd 6022 T62 EoE - sn?.Jo-l8sLoqclM ie:.:Io 9o;_s9.*]58..
Questions? al" Planning Staff at 47g-2r38
APPUCATION FOR DESIGN RFYIEW APPROVAT
GENEML INFORMATION
This application is for any project requiring Design Review approval. Any project requiring design review must
receive Design Review approval prior to submitting for a building permit. For specific information, see the submittal
requirements forthe particular approval that is requested. Theapplication cannot be accepted until all the required
information is submitted. The project may also need to be reviewed by the Town Council and/or the Planning and
Environmental Commission. Design Review Board approval expircs one year after final approval unless a
building permit is issued and construcdon is firbd.
A. DESCRIPTION OFTHE REOUEST:Design Reviev for Single Family
D.
E.
. Bighorn Subdivision r gTt T^t/:,LOCATION OF PROPOSAL: LOT: / BLOCK::!- FIUNG:
pHySICALADDRS55; 3847 Lupine Drive
PARCEL#. 210111102001 (Conbct Eagle Co. Assessors Office at 970-328-8640 for parcel #)
F.
ZONING: Sin
NAMEOFOWNER(S): Nichots
MATSNGADDRESS: 1999 wynkoop st +A1F
Denver CO AO2AZ pnprue: 303-291-f299
owNER(S)STGNAruRE(S):
NAMEOFAPPUCANT. The Mulhern croup,T }A
MAIUNGADDREs5. 1730 B]!I9- I!#435
Denver CO 80202 pg911p; 303-297-3334
TYPE OF REVIEW AND FEE:tt} Nenv ConsUucdon - l2O0 Construction of a new building.
tr Addition -$50 Includes any addition where square footage is added to any
residential or commercial building.
tr Mlnor Alteration - S20 Includes minor changes to buildings and site improvements, such
as, reroofing, painting, window additions, landscaping, fences and
retaining walls, etc,
DRB fees are to be paid at the time of submittal. Later, when applying for a building permit, please identifo
the accurate valuation of the project, TheTown of Vail will adjustthe fee according to the projectvaluation.
PT"EASE SUBMIT THIS APPUCATION' All SUBI,IITTAL REQUIREIIIEI{IS
AND THE FEE TO THE DEPART}IET{T OF COTIIMUI{ITY DEVELOPiIEI{T,
75 SOUTH FROI{TAGE ROAD, VAII, COLORADO 81657.
H.
,d/'i'/tJ
MAY 2 200t
EUIQIN-IIAIERIAIS:
Roof
Siding
Other Wall Materials
Fascia
SofRb
Windows
Window Trim
Doors
Door Trim
Hand or Deck Rails
Flues
Flashing
Chlmneys
Trash Enclosures
Greenhouses
Rebining Walls
Exterior Lighting
Other
TYPE OF MATERIAL:
Stained Cedar Shingles
Wood
Bead Board
Wood
Wood
wood
Wood
Wrought Iron
Copper
Copper
Ashlar Sand Stone
COLOR:
Green
Natural wood
Natural- Wood
Brovn
Stained Wood
Stained Wood
Etural Wood
Na l-- rr ra 'l
Copper
Copper
Tan
N/A
N/A
Cedar Shingles Grey
Ashlar Pattern Sand Stone Tan
Ashlar Sand Stone Tan
Ant i que Brass
* Please specify th'e manufacturer=s color, number and attach a small color ciip
** All exterior lighting must meet the Town=s Lighting Ordinance 12-11-5J. If exterior lighting is proposed,
please indicate the number of fixtures and locations on a separate lighting plan. IdenHry each fixture type
and provide the height above grade, lumens output, luminous area, and atbch a cut sheet ofthe lighting
fixtures.
Brass
THE MULHERN GROUP, Ltd.
Architecture Planning Interiors
1730 Blake Street, Suite 435
Denver, Colorado 80202
(303) 297-3334
FAX (303) 292-26Q1
I Shop drawings El Prints n Plans
D Copy of letter D Change order !
LETTER OF TRANSMITTAL
DATE:05124101 PROJECT NO.: 98043
ATTENTION: Allison Ochs
RE: Darby Vail ll
! Samples E Specifications
TO: Town of Vail Depadment of Community Development
75 South Frontage Road
Vail, CO 81657
WE ARE SENDING YOU X Attached n Under separate cover via fedex the following:
COPIES DATE NO.DESCRIPTION
1 5-24-01 z Application for development review
1 5-24-01 1 check for $200 fee
5-24-01 colored elevations
5-24-01 submittal documents
THESE ARE TRANSMITTED as checked below:
X For approval
! For your use
X As requested
ffi For review and comment
E FOR BIDS DUE
! No exceptions taken
! Rejected
! Reviewed !
E PRINTS RETURNED
AFTER LOAN TO US
! Exceptions as noted
n Revise and resubmit
E Submit specified item
REMARKS: Please let me know if you see any problems or if I left anything out. lt was nice to
meet you yesterday. Thank you for taking the time!
SIGNED:
TE HILBERG
COPY TO:
lf enclosures are not as noted, kindly notify us at once.
***r*+******r***rlr*rtr'y'|Jr**t*'ttt+**'t***+*f ***r****r:r*r*r'r****fL+tl+*f !r,ir*rr,rr.r****rr,r**+*
TOWN oF VAIL, coLoRADO st remenr **t**'l't***'t*+****ir****'*++*******ftil+'|*++*+***t*'t*t*t+**+*'t+++f*ttt*t**'**+***'t*{t*rt*,t*t**+**
Statement Number: R00O0O0g4S Anrount: $zoo.O0 OS/25.2OO1OA:54 ptl Payment Method: Check Inlt: ,JAR
Notation: 18711
Permit No:
Parcel l{o :
Si.te Addrese :
I-rocation:
This Payment :
Dn801013 3
21011110 2 0 01
3847 I,UPII\TE DR \/AIt
game ag above
$200.00
Tytrle: DRB - New ConBtruction
Total Fees:
Total AIJL pmts :
Curent Pmts
$200.00
$200.00 Balance: 90. O0 + I't ** * 'l * '*!*'|. !*'t 'tii ***'| l' * *!*** *+'r *{' *i* +******'}tr *,} r' * * ** *'t **+++ ++**{.*{r*,},t* * * *r * +** ++*,}*+*,* *+ * *,r* *,*
ACCOI]NT ITEM LIST:
Account Code Descri pti on
DR 00100003112200 DESIGN REVIEhI FEES 200.00
o
i
p
m ft -t ol €t 7
c)mi ct
I
@ I z 6}r m g,
Or zl
t.a x I o c
at,
m €n
1'
*It
E;g J-{'
-cm z(fx vrgtJ Fop i*i YcO
=brg
-,@
I
rn }:'{
:E
2 o
a i I
.n i.l
€
c (]
tn I
|..
:Tt o
n .'l .,I
!
m (]I'r
UI T z
t'J
(r')
o o a
m u
o
:!!a
u,{P z m o
€o f)
c|a I
2 o r rn [t,
;oo ?Z<,iV$
9ii<.lr icE aEm zox
@ (O :.r
Fro p _&;' YoO
"-: ir O .,tf
a I
m P --t I z
I m
€o o o
(D
xl
()x
arl {
Q'
€rl
r c
.h
1
I
()
m tJ
a I
2
6)r m a
-!|r
(r,
I z
(..)
.!
-tr
I x ftl 'g
t_
(1
flr
T m ]:'
€o c (:r
gJ
n
C)A m *{
U'
I
i
i
a
-l
.D z
m
v,I
d,r-
m
€
o cl I
z (f
€
U'
i
-.-+
a
-l
z m
€o o (]
!
z m r
U'
I
m
E o o o
E
;u >o x m .1
U}
U'
r m
o:
_t
1
.i ti IJ
.1 C)mo 9B :nm -n IN
;o >: "Yt
fflz (o 6)
1-
i
;
vt I r
o
--l
-J m n z a
z
(t
--{
z ln
o T 'o
m 1
;j o o
]J z a
U'{I z
m o
€o o o
v,I z o r m a
'It 'o
m I -n
F Q I
6)
'!
:
-fl \J \.'4z<dvS
Fii<a i(/lE -r -'t 'cm zQx-@a:1
Fop --ihs {..-..- Y()O i.;rO .,tf
a I m D ..4 I z
1-r
.. 1
-fl
fr lrl 'u
f
o
I
(-r c) \ rr ,\ui \.''J.\':E m
€o o lo (p I (t
r}x lrl -{
Q'
:-o rl
r_l
o r c
v>
1
,
()
ffl tl t'T
U'I z o r m tn
o
m ),
*.€o o (]
tf!
7J
C)i^m *t
TO
.
i
@ -l I z
m
f o
cl
tt,T
o r fn u,
€
o cf
=z qJ
€
U'
!
I
-.1
a -t
z m
€o o (f
1'
z
m r
U'
f
m
{o o 0
ID x
o x rn -'l tn
:
'I
i ll
o()mo g'o }T frm ;n IA 6q
nlz atr O
I
;
l>
v)f
u F -t
-l m n z
z
tn ''l o z
fn
l
conrnnfirv DeveLoPMENr nou?*o Fonu
Routed To:Leonard Sandoval, PW
Date Routed:05/30/01
Routed Bv:Allison Ochs
Dale Due:06t04/01
Description ol work:change from 2{amily to SRF
Address:3847 Luoine Dr.
Leqal:Lot:7 | Block:11 ISubdivision: lbiohornsub
Status:.W n Approved with conditions I Denied
Comments:Date Reviewed:
9,
{,
a
Department of Community Developnent
75 South Frontage Road
Vail, Colorado 81657
970-479-2 138
FAX 970-479-2452
www.ci.vail.co.us
May 16,2001
Attn: Roger White
The Mulhem Group Ltd.
1730 Blake St. Suite 435
Denver, CO 80202
Fax: 303-292-2601
KC Company
P.O. Box 341
Avon, CO 81620
RE: Darby Vail II, the proposed two-family residence to be located st 3847 Lupine Drive /
Lot 7, Block l, Bighorn Subdivision
Dear Roger:
I have driven by the construction site at Lot 7, Block l, Bighom Subdivision, and I have noticed that only
one of the two units is currently under construction. Again, I feel it necessary to inform you that your
DRB approval was for a duplex. The Town of Vail will not be able to grant occupancy for only half of
the duplex. Both halves of the duplex must be completed before the Town of Vail will grant a Tcmporary
Certificate of Occupancy for either of the units. I would recommend that construction commence on the
other half of the duplex before this becomes an issue. I originally brought this to your attention when a
building permit was submitted for only half of the duplex. The Community Development Department
denied this application. We then accepted a building permit tbr both units. Again on March 15, 2001, I
provided written notice that both units will need to be constructed before a TCO would be grantetl fbr
either unit. Should construction continue in obvious conflict to your building pennit and DRB approval, I
will have no choice but to stop construction on the site entirely until this issue can be resolved.
Sincprely, .zt/,
//ilrt-"W
Allison Ochs
Planner II
Town of Vail
{g *un"rro r nr*
D e par t ment of C ommun ity Deve I op me n t
75 South Frontage Road
Vail, Colorado 81657
970-479-2 t 38
F2LX 970-479-2452
www.ci.vail.co.us
May 16,2001
Attn: Roger White
The Mulhem Group Ltd.
1730 Blake St. Suite 435
Denver, CO 80202
Fax: 303-292-2601
KC Company
P.O. Box 341
Avon, CO 81620
RE: Darby Vail il, thc proposed two-family residence to be located at3847 Lupine Drivc /
Lot 7, Block l, Bighorn Subdivision
Dear Roger:
I have driven by the construction site atLotT, Block l, Bighom Subdivision, and I have noticed that only
one of the two units is currently under construction. Again, I fecl it necessary to inform you that your
DRB approval was for a duplcx. The Town of Vail will not be able to grant occupancy for only halfof
the duplex. Both halves of the duplex must be completed before the Town of Vail will grant a Temporary
Certificate of Occupancy for eithcr of thc units. I would recommend that construction commence on thc
other half of the duplex before this becomes an issue. I originally brought this to your attention when a
building permit was submitted for only half of the duplex. The Community Development Departmcnt
denied this application. We then accepted a building permit for both units. Again on March 15,2001, I
provided written notice that both units will nced to be constructed before a TCO would be granted for
either unit. Should construction continue in obvious conflict to your building permit and DRB approval, I
will have no choice but to stop construction on the site entirely until this issue can be resolved.
Sincerely,
Allison Ochs
Planner II
Town of Vail
{g *'o"'u 'o'"*
DEPARTMENTOFTHEARMY O
U.S. ARMY ENGINEER DISTRICT. SACRAMENTO
Regulatory Branch
CORPS OF ENGINEERS
1325 J STREET
SACRAMENTO, CALIFORNIA 95814.2922
August 23, 2000
(20007s339)
Ms. Nicola Rrpley
MonLane Environmental Sol-utions
Post Office Box 3511
VarI, Colorado 81658
Dear Ms D i nl orr.
T am rcsn.)ndi nrr F.r \/.rrrr re.rltcsf . on L:eha'1 f of the NlcholS r q.LL, ! s,-y\-/rrs+.rY
Drrl-nar<hi n/T,nf j- rre f)prral.rnmen1. s - fnr a Tlenartment of fhF Armrr r clr- r-rr\-J- Lf !rf P/ !v! u sE rJs v sr\J
nerm.i F i-o d i sr-harrra f i'1 I maf cri al into wetl-ands adjacent to Gofe
Creek for the construction of a duplex home at 3847 Lupine Drive,
in East Vail. Colorado. The project is l-ocated at Gore Creek, on
Trri ? ni rrh^rn qrrhdirri eian r^rirhin (ar'j- ian ? Townsh in 5 Sorrj- h-LJ\J L I t DIYII\JI.II !-rLrlurvf rJrvrr, J vvse^r,
Range B0 West, Eagle CounEy, Colorado.
The Chief of Engineers has issued natj-onwide general- permit
numbers 12 and 39 which authorizes the discharge of dredged or
fill materi-al in waLers of the United States for utility lines
and for residential, commercial-. and institutional- developments,
respectively. The architect, The Mulhern Group, Ltd, has
submiEEed revised plans which reduced the permanent wetl-and
impact down to 575 square feet. We have determined that your
project. will not affect threatened or endangered species
nr^t- 6,..t- 64 hr; tl.ra Fnd.anrrerarl Qncr.i aq Ar-l- Yottr nroi pr-i cen k:a P-L(Jt-E\-Ultlr iJy urls rJrr\rarrYErs\r ryevf uo l1eu. rvs! t-!vJ constructed under this authorlty provlded the work meeLs the
condi-tions listed on the encLosed information sheets. You musL
send a signed letter of certification to t.he Corps of Engineers
within 3O days after completion of the work (see general
condition number 14) . A copy of t.he certifj-cation staEement is
included for your use.
This verification is val-id until February 11, 2002. If you
herrp nnf r.nmnl eted rrnrrr nr^i er.l- hr- Ll--t ! r -^ --^" shoul-d contact rro.vs rr\JL \?\Jrrr}Jr \- \-sL.r y\rLr! P!\rJ e\-L rJy LllctL ulllt<:r y\JLr i
the Corps of Engineers Lo obtain informaLion on any changes which
may have occurred to the nationwide permits. You are responsibl-e
for remaining informed of such changes.
REPLYIO
ATTETMON OF
ffi
-2-
We have assigned number 200075339 to your project. Please refer to this number in any correspondence with this office. If you have any quesEions, please contact Mr. Michael Claffey of
Ehis office or Eelephone number (970) 243-1,199, extension 13.
n\{.
McNure
rthwestern Colorado orv office
Avenue, Room 142
and,Junction, Colorado 8L50L-2553
Enclosure
Copies Furnished:
Mr. Ron D. Velarde, Colorado Division of Wildlife, 1It
Independent Avenue, Grand Junction, Colorado 81501 Mr. A1 Pfister, U.S. Fish and Wi.ldlife Service, 764 Horizon
Dri-ve, Building B, Grand Junction, Colorado 81506-3945
The Mulhern Group, 1730 Blake Street, SuiEe 435, Denver,
Colorado 80202
,-g erel-
CERTIFICATION OF COMPLETION
Permit File Number: 200075339
County Where Work was Perfonned: Eagle
Name of Permittee; Nichols/Loftus
Date of Permit Issuance: 8lZ3lO0 Permit Type: N"WP 39 & 12
Upon completion of the activrty authorized by this perrnit, and any mitigation required by
the permit, please sign this certification and return it to the following address:
Western Colorado Regulatory Office
Corps of Enqineers, Sacramento District
402 Rood Avenue, Room 142
Grand Junction, Colorado 81501-2563
Please note that your permined activity is subject to a compliance inspection by an U.S.
Army Corps of Engineers representative. If you fail to comply with the permit issued to
you, you are subject to permit suspension, modification, or revocation. If you have any
questions about this certification, please contact the Corps of Engineers office in Grand
Junction, telephone number (970) 243-1199.
I hereby certify that the work authorized by the above referenced permit has been completed
in accordance with the terms and conditions of said permit, and required mitigation was
completed in accordance with the permit conditions.
Signature of Permittee Date
trro**rDE PERMTT?,,
UTILITY LINE ACTIVITIES
(Sections 10 and 404)
Effective Date: 07 June 2000 Expires 11 February 2002
Note: Additional infonnation on this and other Nationwide permits can be obtained on the
internet at http : //www. spk. usace. army. m i I /cespk-co/re gulatory/
The Corps of Engineers has issued a nationwide general permit (NWP) authorizing activities
required for the construction, maintenance, and repair ofutility lines aud associated facilities in
waters of the United States as follows:
(i) Utility lines: The construction, mairtenance, or repair of utility lines, including
outfall and intake structures and the associated excavation, backfill, or bedding for the utility
lines, in all waters of the United States, provided there is no change in preconstruction
contours. A "utility line" is defrned as any pipe or pipeline for the transportation of any
gaseous, liquid, liquefiable, or slurry substance, for any purpose, and any cable, line, or wire
for the transmission for any purpose ofelectrical energy, telephone, and telegraph messages,
and radio and television communication (see Note 1, below). Material resulting from trench
excavation may be temporarily sidecast (up to three months) into waters of the United States,
provided the material is not placed in such a manner that it is dispersed by currents or other
forces. The District Engineer may extend the period of temporary side casting not to exceed a
total of 180 days, where appropriate. In wetlands, the top 6" to 12" ofthe trench should
normally be backfilled with topsoil from the trench. Furthermore, the trench cannot be
constructed in such a manner as to drain waters of the United States (e.g., backfilling with
extensive gravel layers, creating a french drain effect). For example, utility line trenches can
be backfilled with clay blocks to ensure that the trench does not drain the waters of the United
States through which the utilify line is installed. Any exposed slopes and stream banks must be
stabilized immediately upon completion of the utility line crossing of each waterbody.(ii) Utility line substations: The construction, maintenance, or expnnsion of a
substation faciliry associated with a power line or utility line in non-tidal waters of the United
States, excluding non- tidal wetlands adjacent to tidal waters, provided the activity does not
result in the loss of greater than 1/2 acre of non-tidal waters of the United States.(iii) Foundations for overhead utility line towers, poles, and anchors: The construction
or maintenance of foundations for overhead utility line towers, poles, and anchors in all waters
of the United States, provided the foundations are the minimum size necessary and separate
footings for each tower leg (rather than a larger single pad) are used where feasible.(iv) Access roads: The construction of access roads for the construction and
maintenance of utility lines, including overhead power lines and utility line substations, in
non-tidal waters of the United States, excluding nontidal wetlands adjacent to tidal waters,
provided the discharge does not cause the loss of greater than ll2 acre of non-tidal waters of
the United States. Access roads shall be the minimum width necessary (see Note 2, below).
Access roads must be constructed so that the length of the road minimizes the adverse effects
on waters of the United States and as ne:u as possible to preconstruction contours and
elevations (e.g., at grade corduroy roads or geotextile/gravel roads). Access roads constructed
above preconstruction contours and elevations in waters of the United States must be properly
bridged or culverted to maintain surface flows.
The term ' 'utilitv liue" does not include activities which drain a water of the
Thi$ inlbrdrtion sllcrt \+!l prEtErld 24 May 2U.IJ
NATIONWIDE PERMIT #12
Pase 2
United States, such as drainage tile or french drains; however, it does apply to pipes conveying
drainage from another area. For the purposes of this NWP, the loss of waters of the United
States includes the filled area plus waters of the United States that are adversely affected by
flooding, excavation, or drainage as a result ofthe project. Activities authorized by paragraphs
(i) through (iv) may not exceed a total of ll2 acre loss of waters of the United States. Waters of
the United States temporarily affected by filling, flooding, excavation, or drainagg, where the
project area is restored to preconstnrction contours and elevatiors, are not included in the
calculation of permanent loss of waters of the United States. This includes temporary
construction mats (e.g., timber, steel, geotextile) used during construction and removed upon
completion of the work. Where certain functions and values of waters of the United States are
pennanently adversely affected, such as the conversion ofa forested wetland to a herbaceous
wetland in the permanently maintafurcd utility line right-of-way, mitigation will be required to
reduce the adverse effects of the project to the minimal level.
Mechanized landclearing necessary for the construction, maintenance, or repair of utility
lines and the construction, maintenance, and expansion of utility line substations, foundations
for overhead utilify lines, and access roads is authorized, provided the clcared area is kept to
fte minimum necessary and preconstruction contours are maintai:red as near as possible. The
area of waters of the United States that is filled, excavated, or flooded must be limited to the
minimum necessary to construct the utility line, substations, foundations, and access roads.
Excess material must be removed to upland areas immediately upon completion of
construction. This NWP may authorize utility lines in or affecting navigable waters of the
United States, even if there is no associated discharge of dredged or f,ilI material (See 33 CFR
Part322).
Notification: The permittee must notify the District Engineer in accordance with General
Condition 13, if any of the following criteria are met:(a) Mechanizsd land clearing in a forested wetland for the utility line right-of-way;
(b) A Section 10 permit is required;(c) The utility lile in waters of the United States, excluding overhead lines, exceeds
500 feet;
(d) The utility line is placed within a jurisdictional area (i.e., a water of the United
States), and it runs parallel to a stream bed that is within thatjurisdictional area;
(e) Discharges associated with the construction of utiliry line substations that result in
the loss of greater than 1/10 acre of waters of the United States;
(0 Permanent access roads constructed above grade in waters of the United States for
a distance of more than 500 feet; or
(g) Permanent access roads consfucted in waters of the united states with
impervious materials. (Sections 10 and 404)
Note 1: Overhead utilify lines constructed over Section l0 waters and utility lines
that are routed in or under Section l0 waters without a discharge of dredged or fill material
require a Section 10 permit; except for pipes or pipelines used to transport gaseous, liquid,
liquefiable, or slurry substances over navigable waters ofthe United States, which are
considered to be bridges, not utility lines, and may require a permit from the U.S. Coast Guard
pursuant to Section 9 of the Rivers and Harbors Act of 1899. However, any discharges of
dredged or till material associated with such pipelines will require a Corps perrnit under
This ,nlbrmrtion shcc| was fr€parcd ?4 Mry 2U{.
NATIONWIDE PERMIT #12
Pase 3
Section 404.
Note 2: Access roads used for both construction and maintenance may be
authorized, provided they meet the terms and conditions of this NWP. Access roads used
solely for construction of the utility line must be removed upon completion of the work and the
area restored to preconstruction contours, elevations, and wetland conditions. Temporary
access roads for constmction may be authorized by NWP 33.
Note 3: Where the proposed utility line is constructed or installed in navigable
waters of the United States (i.e., Section 10 waters), copies of the PCN and NWP verification
will be sent by the Corps to the National Oceanic and Atmospheric Administration, National
Ocean Service, for charting the utility line to protect navigation.
NA TTONWINE PFRMIT CONNITIONS
A. GFNFRAL CONDITIONS: The general conditions listed in the Nationwide Permit
Genersl Conilitions Information sheet must be followed in order for any authorization by a
NWP to be valid.
B. FURTI{FRINFORMATION:
1. District Engineers have the authority to determine if an activity complies with the
terms and conditions of a nationwide permit.
2. Nationwide permits do not obviate the need to obtain other Federal, state, or local
permits, approvals, or authorizations required by law.
3. Nationwide permits do not grant any property rights or exclusive privileges.
4. Nationwide permits do not authorize any injury to the property or rights of others.
5. Nationwide permits do not authorize interference with any existing or proposed
Federal project.
Thrs |nlnrlnrln|n shdr wa FF sr 24 Mry 2qI)
o
NA TIONWIDE PERMIT 39
RESIDENTIAL, COMMERCIAL, AND INSTITUTIONAL DEVELOPMENTS
(Sections 404)
Effective Date: 09 June 2000 Expires 11 February 2002
Note: Additional information on this and other Nationwide permits can be obtained on the
internet at http ://www. spk. usace. army.mil/sg5pl-gs/regulatory/
The Corps of Engineers has issued a nationwide general permit (NWP) authorizing discharges
of dredged or fill material into non+idal waters of the United States, excluding non+idal
wetlands adjacent to tidal waters, for the consffuction or expansion of residential, commercial,
and institutional building foundations and building pads and attendant features that are
necessary for the use and maintenance of the structures. Attendant features may include, but
are not limited to, roads, parking lots, garages, yards, utility lines, stormwater management
facilities, and recreation facilities such as playgrounds, playing fields, and golfcourses
(provided the golf course is an integral part of the residential development). The construction
of new ski areas or oil and gas wells is not authorized by this NWP. Residential developments
include multiple and single unit developments. Examples of commercial developments include
retail stores, industrial facilities, restaurants, business parks, and shopping centers. Examples
of institutional developments include schools, fue stations, govemment office buildings,
judicial buildings, public works buildings, libraries, hospitals, and places of worship. The
activities listed above are authorized, provided the activities meet all of the following criteria:
a. The discharge does not cause the loss ofgreater than L/2 acre ofnon-tidal waters of
the United States, excluding non-tidal wetlands adjacent to tidal waters;
b. The discharge does not cause the loss of greater than 300 linear feet of stream !sd;c. The permittee must notify the District Engineer in accordance with General
Condition 13, if auy of the following criteria are met:(1) The discharge causes the loss of greater than l/10 acre of non-tidal waters of
the United States, excluding non-tidal wetlands adjacent to tidal waters; or (2) The discharge causes the loss ofany open waters, including perennial or
intermittent streans, below the ordinary high water mark (see Note, below).
d. For discharges in special aquatic sites, including wetlands, the notifrcation must
include a delineation of affected special aquatic sites;
e. The discharge is part of a single and complete project;
f. The permittee must avoid and minimize discharges into waters of the United States
at the project site to the maxinum extent practicable, and the notihcation, when required, must
include a written statement explaining how avoidance and minimization of losses of waters of
the United States were achieved on the project site. Compensatory mitigation will normally be
required to offset the losses of waters of the United States. (See General Condition 19.) The
notification must also include a compensatory mitigation proposal for offsetting unavoidable
lossesof watersof theUnitedStates. If anapplicantassertsthattheadverse effectsof the
project are minimal without mitigation, then the applicant may submit justification explaining
why compensatory mitigation should not be required for the District Engineer's consideration;
g. When this NWP is used in conjunction with any other NWP, any combined total
permanent loss of waters of the United States exceeding 1/10 acre requires that the permittee
notiry the District Engineer in accordance with General Condition 13;
This nli)rmatn)n shcct wis trftta&d 26 Mry 2fiy0.
NATIONWIDE PERMIT 39
Pase 2
h. Any work authorized by this NWP must not cause more than minimal degradation
of water quality or more ft2s minimal changes to the flow characteristics of any stream (see
General Conditions 9 and 21);
i. For discharges causing the loss of l/10 acre or less of waters of the United States,
the permittee must submit a report, qrithin 30 days of completion of the work, to the District
Engineer that contai:rs the following information: (1) The name, address, and telephone
number of the permittee; (2) The location of the work; (3) A description of the work; (4) The
type and acreage of the loss of waters of the United States (e.g., lll2 acre of emergent
wetlands); and (5) The type and acreage of any compensatory mitigation used to offset the loss
of waters of the United States (e.g., lll2 acre of emergent wetlands created on-site);j. If there are any open waters or strearns within the project area, the permittee will
establish and maintain, to the maximum extent practicable, wetland or upland vegetated buffers
next to those open waters or streams consistent with General Condition 19. Deed restrictions,
conservation easements, protective covenants, or other means of land conservation and
preservation are required to protect and maintain the vegetated buffers established on the
project site; and
k. Stream channelization or stre'm relocation downstream of the point on the stream
where the annual average flow is I cubic foot per second is uot authorized by this NWP.
Only residential, commercial, and institutional activities with stnrctures on the
foundation(s) or building pad(s), as well as the attendant features, are authorized by this NWP.
The compensatory mitigation proposal required in paragraph (0 of this NWP may be either
conceptual or detailed. The wetland or upland vegetated buffer required in paragraph 0) of this
NWP will normally be 25 to 50 feet wide on each side of the stream, but the District Engircer
may require wider vegetated buffers to address documented water quality concerns. The
required wetland or upland vegetated buffer is part of the overall compensatory mitigation
requirement for this NWP. If the project site was previously used for agricultural purposes and
tle farm owner/ operator used NWP 40 to authorize activities in waters of the United States to
increase production or construct farm buildings, NWP 39 cannot be used by the developer to
authorize additional activities in waters of the United States on the project site in excess of the
acreage limit for NWP 39 (i.e., the combined acreage loss authorized under NWPs 39 and 40
cannot exceed ll2 acre)-
Subdivisions: For any real estate subdivision created or subdivided after October 5,
1984, a notification pursuant to paragraph (c) of this NWP is required for any discharge which
would cause the aggregate total loss of waters of the United States for the entire subdivision to
exceed 1/10 acre. Any discharge in any real estate subdivision which would cause the
aggregate total loss of waters of the United States in the subdivision to exceed 1/2 acre is not
authorized by this NWP, unless the District Eugiaeer exempts a particular subdivision or
parcel by meking a written determination that the individual and cumulative adverse
environmental effects would be minimal and the property owner had, after October 5, 1984,
but prior to July 21, 1999, committed substantial resources in reliance on NWP 26 with regard
to a subdivision, in circumstances where it would be inequitable to frustrate the property
owner's investrnent-backed expectations. Once the exemption is established for a subdivision,
subsequent lot development by individual property owners may proceed using NWP 39. For
the purposes of NWP 39, the term ''real estate subdivision" shall be interpreted to include
circumstances where a landowner or developer divides a tract of land into smaller parcels for
This inkrma(ion $l.iit was frBfslld 26 May 2000.
NATIONWIDE PERMIT 39
Paee 3
the purpose of selling, conveying, transferring, leasing, or developing said parcels. This would
include the entire area of a residential, commercial, or other real estate subdivision, including
all parcels and parts thereof. (Sections 10 and 404)
Note: Areas where there is no wetland vegetation are determined by the presence or
absence of an ordinary high water mark or bed and bank. Areas that are waters of the United
States based on this criteria would require a PCN even though water is infrequently present in
the stream channel (except for ephemeral waters).
NATIONWTNF PERMIT CONDITIONS
A. GENERAL CONDITIONS: The general conditions listed in the Nationwide Permit
General Conditions Information sheet must be followed in order for any authorization by a
NWP to be valid.
B. FURTHFRINFORMATION:
1. District Engineers have the authority to determine if an activity complies with the
terms and conditions of a nationwide permit.
2. Nationwide permits do not obviate the need to obtain other Federal, state, or local
permits, approvals, or authorizations required by law.
3. Nationwide perrnits do not grant any property rights or exclusive privileges.
4. Nationwide permits do not authorue any injury to the properry or rights of others.
5. Nationwide perrnits do not authorize interference with any existing or proposed
Federal project.
This inlbrmarton shcet w.r f'rtpaltd 26 Mry 2m-
o
NWIDE
o
CO NATIO PERMIT GEI{ERAL NDITIONS
The following general conditions must be followed in order for any authorization by an NWP to
be valid:
1. Navigation. No activity may cause more than a minimal adverse effect on navigation.
2. Proper Maintenance. Any stuchue or fill authorized shall be properly maintained,
including maintenance to ensure public safety.
3. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment controls must
be used and maintained in efifective operating condition during construction, and all exposed soil
and other fills, as well as any work below the ordinary high water mark or high tide line, must be
permanently stabilized at the earliest practicable date.
4. Aquatic Life Movements. No activity may substantially disrupt the movement of those
species of aquatic lif-e indigenous to the waterbody, including those species which normally migrate
through the are4 unless the activity's primary purpose is to impound water. Culverts placed in
streams must be installed to maintain low flow conditions.
5. Equipment. Heavy equipment working in wetlands must be placed on mats, or other
measures must be taken to minimize soil disturbance.
6. Regional and Case-By-Case Conditions. The activity must comply with any regional
conditions which may have been added by the division engineer (see 33 CFR 330.4(e)) and with
any case specific conditions added by the Corps or by the State or tribe in its Section 401 water
quality certification and Coastal Zone Management Act consistency determination.
7. Imld and Scenic Rivers. No activity may occur in a component of the National Wild and
Scenic River System; or in a river officially designated by Congress as a "study river" for possible
inclusion in the system, while the river is in an official study status; unless the appropriate Federal
agency, with direct management responsibility for such river, has determined in writing that the
proposed activity will not adversely affect the Wild and Scenic River designation, or study status.
Information on Wild and Scenic Rivers may be obtained from the appropriate Federal land
management agency in the area (e.g., National Park Service, U.S. Forest Service, Bureau of Land
Management, U.S. Fish and Wildlife Service).
8. Tribal Rights. No activity or its operation may impair reserved tribal rights, including, but
not limited to, reserved water rights and treaty fishing and hunting rights.
9. llrater Quality.(a) In certain States and tribal lands an individual 401 water quality certification must be
obtained or waived (See 33 CFR 330.4(c)).
(b) For NWPs 12, 14, 17, 18, 32, 39, 40, 42, 43, and 44, where the State or tribal 401
certification (either generically or individually) does not require or approve a water quality
management plan, the permittee must include design criteria and techniques that will ensure that the
authorized work does not result in more ttran minimal degradation of water quality. An important
component of a water quality management plan includes stormwater management that minimizes
degradation of the downsffeam aquatic system, including water quality. Refer to General Condition
21 for stormwater management requirements. Another important component of a water quality
management plan is the establishment and maintenance of vegetated buffers next to open waters,
including sueams. Refer to General Condition 19 for vegetated buffer requirements for the NWPs.
10. Coastal Zone Management.ln certain states, an individual state coastal zone management
consistency concurence must be obtained or waived (see Section 330.4(d).
This htbnhauon shi.rl $8 f'(eftaNd 26 Mry 2u) .
o
NA
o
oNs TIONWIDE GENERAL CONDITI
Pape 2
11. Endangered Species.
(a) No activity is authorized under any NWP which is likely to jeopardize the continued
existence of a threatened or endangered species or a species proposed for such designation, as
identified under the Federal Endangered Species Act, or which will destroy or adversely modifu the
critical habitat of such species. Non-federal permittees shall notiff the District Engineer if any
listed species or designated critical habitat might be affected or is in the vicinity of the project, or is
located in the designated critical habitat and shall not begin work on the activity until notified by
the District Engineer that the requirements of the Endangered Species Act have been satisfied and
that the activity is authorized. For activities that may affect FederallyJisted endangered or
threatened species or designated critical habitat, the notification must include the name(s) of the
endangered or threatened species that may be affected by the proposed work or that utilize the
designated critical habitat that may be affected by the proposed work. As a result of formal or
informal consultation with the FWS or NMFS, the District Engineer may add species-specific
regional endangered species conditions to the NWPs.
(b) Authorization of an activity by a nationwide permit does not authorize the "take" of a
threatened or endangered species as defined under the Federal Endangered Species Act. In the
absence of separate authorization (e.g., an ESA Section 10 Permit, a Biological Opinion with
"incidental take" provisions, etc.) from the U.S. Fish and Wildlife Service or the National Marine
Fisheries Service, both lethal and non-lethal "takes" of protected species are in violation of the
Endangered Species Act. Information on the location of threatened and endangered species and
their critical habitat can be obtained directly from the offices of the IJ.S. Fish and Wildlife Service
and National Marine Fisheries Service or their world wide web pages at
http://www.fivs.gov/r9endspp/endspp.html and http://www.nfrns.gov/prot_res/esahome.hfrnl,
respectively.
12. Historic Properties. No activity which may aflect historic properties listed, or eligible for
listing, in the National Register of Historic Places is authorized, until the DE has complied with the
provisions of 33 CFR part 325, Appendix C. The prospective permittee must notifu the District
Engineer if the authorized activity may affect any historic properties listed, determined to be
eligible, or which the prospective permittee has reason to believe may be eligible for listing on the
National Register of Historic Places, and shall not begin the activity until notified by the District
Engineer that the requirements of the National Historic Preservation Act have been satistied and
that the activity is authorized. Information on the location and existence ofhistoric resources can be
obtained from the State Historic Preservation Office and the National Register of Historic Places
(see 33 CFR 330.4(g)). For activities that may affect historic properties listed in, or eligible for
listing in, the National Register of Historic Places, the notification must state which historic
property may be affected by the proposed work or include a vicinity map indicating the location of
the historic property.
ThN inh'rmauon shcd was Fuf}rnd 26 Mry 2tx)().
o
NA
o
oNs TIONWIDE GENERAL CONDITI
Pase 3
13. Notifcation.
(a) Timing: Where required by the terms of the N.WP, the prospective permittee must
notiry the District Engineer with a preconstuction notification (PCN) as early as possible. The
District Engineer must determine if the PCN is complete within 30 days of the date of receipt and
can request the additional information necessary to make the PCN complete only once. However, if
the prospective permittee does not provide all of the requested information, then the District
Engineer will notify the prospective permittee that the PCN is still incomplete and the PCN review
process will not commence until all of the requested information has been received by the District
Engineer. The prospective permittee shall not begin the activity:
(l) Until notified in writing by the Disnict Engineer that the activity may proceed
under the NWP with any special conditions imposed by the District or Division Engineer; or
(2) If notified in writing by the District or Division Engineer that an individual
permit is required; or
(3) Unless 45 days have passed from the District Engineer's receipt of the complete
notification and the prospective permittee has not received written notice from the District or
Division Engineer. Subsequently, the permittee's right to proceed under the NWP may be modified,
suspended, or revoked only in accordance with the procedure set forth in 33 CFR 330.5(dX2).
(b) Contents of Notification: The notification must be in writing and include the following
information:
(1) Name, address, and telephone numbers of the prospective permittee;
(2) Location ofthe proposed project;
(3) Brief description of the proposed project; the project's purpose; direct and
indirect adverse environmental effects the project would cause; any other NWP(s), regional general
permit(s), or individual permit(s) used or intended to be used to authorize any part of the proposed
project or any related activity; and
(4) For NWPs 7, 12, 14, 18, 21, 34, 38, 39, 40, 41, 42, and 43, the PCN must also
include a delineation of affected special aquatic sites, including wetlands, vegetated shallows (e.g.,
submerged aquatic vegetation, seagrass beds), and riffle and pool complexes (see paragraph l3(f);
(5) For NWP 7, Outrall Structures and Maintenance, the PCN must include
information regarding the original design capacities and configurations of those areas of the f'acility
where maintenance dredging or excavation is proposed.
(6) For NWP 14, Linear Transportation Crossings, the PCN must include a
compensatory mitigation proposal to offset permanent losses of waters of the United States and a
statement describing how temporary losses of waters of the United States will be minimized to the
maximum extent practicable.
(7) For NWP 21 , Surface Coal Mining Activities, the PCN must include an Office of
Surface Mining (OSM) or state-approved mitigation plan.
(8) For NWP 27, Steam and Wetland Restoration, the PCN must include
documentation of the prior condition of the site that will be reverted by the permittee.
Tbis inli)rm{ion sh(rt wa! r,ftfBrld 26 May 2uX).
o
NA
o
ITIONS
'{,
:
:
!;l
TIONWIDE GENERAL COND
(9) FoTNWI'29, Single-Family Housing, ttre PCN must also include:
(i) Any past use of this NWP by the individual permittee and/or the permittee's
spouse;
(ii) A statement that the single-family housing activity is for a personal
residence of the permitldc;
(iii) A description of the entire parcel, including its size, and a delineation of
wetlands. For the purpOFe of this NWP, parcels of land measuring l/4 acre or less will not require a
formal on-site delineatlon. However, the applicant shall provide an indication of where the
wetlands are and the antount of wetlands that exists on the property. For parcels greater than ll4
acre in size, a formal wotland delineation must be prepared in accordance with the current method
required by the Corps. (See paragraph l3(0);
(iv) A written description ofall land (including, ifavailable, legal descriptions)
owned by the prospective permittee and/or the prospective permittee's spouse, within a one mile
radius ofthe parcel, in ony form ofownership (including any land owned as a partner, corporation,
joint tenan! co-tenant, or as a tenant-by-the-entfuety) and any land on which a purchase and sale
agreement or other contract for sale or purchase has been executed;
(10) For NWP 31, Maintenance of Existing Flood Control Projects, the prospective
permittee must either notiff the District Engineer with a PCN prior to each maintenance activity or
submit a five year (or less) maintenance plan. In addition, the PCN must include all of the
following:
(i) Sufficient baseline information so as to identify the approved channel
depths and configurations and existing facilities. Minor deviations are authorized, provided the
approved flood control protection or drainage is not increased;
(iD A delineation ofany affected special aquatic sites, including wetlands; and,
(iii) Location of the dredged material disposal site.
(11) For NWP 33, Temporary Construction, Access, and Dewatering, the PCN must
also include a restoration plan of reasonable measures to avoid and minimize adverse effects to
aquatic resources.
(12) For NWPs 39, 43, and 44,the PCN must also include a written statement to the
District Engineer explaining how avoidance and minimization of losses of waters of the United
States were achieved on the project site.
(13) For NWP 39, Residential, Commercial, and Institutional Developments, and
NWP 42, Recreational Facilities, the PCN must include a compensatory mitigation proposal that
oflsets unavoidable losses of waters of the United States or justification explaining why
compensatory mitigation should not be required.
(14) For NWP 40, Agriculnual Activities, the PCN must include a compensatory
mitigation proposal to offset losses of waters of the United States.
(15) For NWP 43, Stormwater Management Facilities, the PCN must include, for the
construction of new stormwater management facilities, a maintenance plan (in accordance with
State and local requirements, if applicable) and a compensatory mitigation proposal to offset losses
of waters of the United States.
This inlormllr.'fl she{ *s nR'Iu{ :6 Mly 21x,...
o
ONS NATIONWIDE GENERAL CONDITI
Pase 5
(16) For NW? 44, Mining Activities, the PCN must include a description of all waters
of the United States adversely affected by the projecg a description of measures taken to minimize
adverse effects to waters of the United States, a description of measures taken to comply with the
criteria of the NWP, and a reclamation plan (for aggregate mining activities in isolated waters and
non- tidal wetlands adjacent to headwaters and any hard rock/mineral mining activities).
( 17) For activities that may adversely aflect FederallyJisted endangered or threatened
species, the PCN must include the name(s) of those endangered or tlueatened species that may be
affected by the proposed work or utilize the designated critical habitat that may be affected by the
proposed work.
(18) For activities that may affect historic properties listed in, or eligible for listing in,
the National Register of Historic Places, the PCN must state which historic property may be
aflected by the proposed work or include a vicinity map indicating the location of the historic
property.
(19) For NWPs 12, 14,29,39,40,42,43, and 44, where the proposed work involves
discharges of dredged or fill material into waters of the United States resulting in permanent,
above-grade fills within 100-year floodplains (as identified on FEMA's Flood Insurance Rate Maps
or FEMA-approved local floodplain maps), the notification must include documentation
demonsfrating that the proposed work complies with the appropriate FEMA or FEMA-approved
local floodplain construction requirements.
(c) Form of Notification: The standard individual permit application form (Form ENG
4345) may be used as the notification but must clearly indicate that it is a PCN and must include all
of the information required in (b) (1)-(19) of General Condition 13. A letter containing the requisite
ffirmation may also be used.
(d) District Engineer's Decision: In reviewing the PCN for the proposed activity, the
District Engineer will determine whether the activity authorized by the NWP will result in more
than minimal individual or cumulative adverse environmental etl'ects or may be contrary to the
public interest. The prospective permittee may, optionally, submit a proposed mitigation plan with
the PCN to expedite the process and the District Engineer will consider any proposed compensatory
mitigation the applicant has included in the proposal in determining whether the net adverse
environmental effects to the aquatic environment of the proposed work are minimal. If the District
Engineer determines that the activiry complies with the terms and conditions of the NWP and that
the adverse effects on the aquatic environment are minimal, the District Engineer will notily the
permittee and include any conditions the District Engineer deems necessary.
Thk inlirrmation shcct wr$ tflFrrcd 26 May 2Ul).
9.O,'Bo4 606 .'Vail', Co [orado 8 ]. ti 58 . (9701 -.1?e,'--i.i.c
Date: October I 1. 1999
1'o: Roger White; Mulhern Group
1730 Blake Sr.. Ste. .li5
Denver. CO 80202
Ph: 301.197.i33.t. Fcr"x: i0i.292.:60 1
From; V1ark Stelle. Cerritied Arborisr
Subject: Tree preservation limits of disnubance J847 I-upine Dr.ive. Vail. CO
Scope ofwork:
A site visit has been requested to determine limit-ot'-disturbance guidelines rbr
two large evergreen trees Iocated on a vacant lor at j847 Lupine Drive.
Qualifications:
I am an Urban Forester/Consulting Arborist rvho is ccrrified by the {nternational
Society of r\rboricu.lture. I ha!:e been evaluating ibrest and landscape trees in the
Aspen and Vail valleys fbr I0 years.
Lirniting condirions: ,
I 'l hc guideiines presented are bascd upon visual observ'ations at a reccnrl./
undisturbed site.
r\ more precise means otldetermining rhe limit-oidisturbance is a Cenitjed
Arborist supervised exploratory e.\ca\,'ation (not included in rrresent scope ol'
r.vork).
Determining the limit-of-disturbance is only one small pan ot'a
conrprehensive tree preservation program.
There, is no warranty or guarantee, expressed or implied that tlre sole use oi
these limit-of-disturbancE guidelines will avoid any problems or deficiencies
of thcse trees in the tirttue.
Obsen,arions(Thursday-. I 0/7/991 :
West tree:
Spccies - Blue spruce (Picea pungens)
Trunk diameter - iTinch Dbh(Diameter.ar breast height of 4.5fcet.y
Dripline radius - l7[eet
General condition - Above average
Average lateral tbliage growrh rate - 3inches per year
Terminal leader - I.ive and lullv intacr
l\
A.\
::::,-':.-.=-.
oocaTa TnN Tocc 9263594 10 t12t9S Job 757
Page 2 of2
October 1 I, 1999
ldulhern Group / 3847 Lupinc Dr.
cast tree:
Species - Blue spruce
l'runk diameter - 27inch Dbh
Dripline radius - l6feet
General condition. - Above average
Average lateral foliage growth rate - 3inches
Tcrminal leader - Live and tirllv intact
Discussion: !'i'hese two trees aro locaredat a transirion zone with "boggyl', excess moisture
conditions to,the north, and the drier (possibly introduced fill dirt) conditions to
the south. I would anticipatethe greatest laterai expanse ofroots ro occur in an
easterly and rvesterly direction (along the edge of the transition). The roors likely
extend an easteriy/westerly,distance of I % to 2 times the span of the dripline
radius.
Page 3/3
On the south side (towardsthe,building) I anricipate rhe roors to extend a distance
of I % to I % times the span ot'the dripiine radius. As rnenrioned previously, the
only way to gain a more precise measure of root expanse is through exploratory
excavation.
Conciusion;
, I recommend a,limit of-disturbstrce of not less than 20 feet from the trunk of
each trec' This is the poinf at which the construction fence shoulcl be installed.
The plotted location of the building foundation wall should be a direcr reflection
of the wall depth, andr type of shoring required to maintain, the integritv of rtl
topsoil within the, lirnit of-disturbance.
lr \r,
Department of Commwity Development
75 South Frontage Road
Vail. Colorado 81657
970-479-2138
MX 970-479-2452
www.ci.vail.co.us
March 12,2001
Attn: Roger White
The Mulhem Group Ltd.
1730 Blake St. Suite 435
Denver, CO 80202
Fax: 303-292-2601
KC Company
P.O. Box 431
Avon, CO 81620
RE: Darby Vail II, the proposcd two-family residence to be located at 384'7 Lupine Drive / Lot
7, Block l, Bighorn Subdivision
Dear.Roger:
I have recently received an ILC for Darby Vail II, located at Lot 7, Block l, Bighom
Subdivision. It has come to my attention that only half of the duplex is currently under
construction. I feel it necessary to inform you that your DRB approval was for a duplex. The
Town of Vail will not be able to grant occupancy for only half of the duplex. Both halves of the
duplex must be completed before the Town of Vail will grant a Tcmporary Certifrcate of
Occupancy for either of the units. I would recommend that construction commence on the other
half of the duplex before this becomes an issue.
Sincerelv.
tuhM,
Allison Ochs
Planner II
Town of Vail
{S ""n"rro" r*
THE MULHERN GROUP, Ltd.
Architecture Planning Interiors
1730 Blake Street, Suite 435
Denver, Colorado 80202
(303) 297-3334
FAX (303) 292-2601
TO: Town of Vail Dept. of Community Development
75 South Frontage Road
Vail, CO 81657
WE ARE SENDING YOU E Attached n Under separate cover via courier the following:
! Shop drawings I Prints D Plans
E Copy of letter E Change order tr
E Samples E Specifications
THESE ARE TMNSMITTED as checked below:
E For approval
ffi For your use
ffi As requested
! For review and comment
L] FOR BIDS DUE
! No exceptions taken
! Rejected
n Reviewed
LJ PRINTS RETURNED
AFTER LOAN TO US
! Exceptions as noted
! Revise and resubmit
! SuOmit specified item
COPIES DATE NO.DESCRIPTION
2 12t4t00 1 Revised Site Plan 41 .0
z 12t4tO0 Revised Floor Plans - Nichols - Phase A
a 12l4lO0 Revised Floor Plans - Loftus - Phase B
2 12t4t00 1 Revised Landscape Plan
2 12t4t00 1 Revised Lightinq Plan
f (,rz'Vuf^gt(,??Prn.fi Appr-r'a(r^D fo fup"u
REMARKS: Please note that the fol items have been addressed:
2. Snow storage areas are indicated on the site plan.
1. The site distance triangles are noted on the site plan with additional notes as to maintenance.
3. GRFA has been recalculated and updated and is shown on each plan sheet.
4. The area above the closet on the Loftus'side has been included in the GRFA.
5. The area shown on the Nichols'side, which is open through each floor, has been noted as a
"callthru" for lack of a better descriptive term.
6. The heights of the various roof elements are shown on the site plan.
7. The site plan has been cleaned up and renoted for better legibility.
SIGNED:
KA
Please note that Sheet 41 .0 shall govern for both phases of this project. r
COPY TO:
lf enclosures arc not as noted, kindly notify us at once,
oo
Community Development Plan Routing Form
Routed To:Leonard Sandoval. Public Works
Return To:Allison
Date Routed:l1/15/00
Return By:ASAP
Project Name:
Project Address:
Project Legal:
Project Description:
LoftusA.lichols Duplex - Darby Vail II
3847 Lupine Dr
Lot 7. Block I . Bighom l st
New PiS
Revisions to original Design Review Board submittal - please re-review.
Approved _x_Denied (cite detailed reasons) _Approved with conditions
Need Landscape Plan
As proposed. you show you don't have the site distance that is required offthe driveways, the wetlands in the area
ofLupine Dr and Bridge Rd. Intersection. Show on site/landscape plan how you are to achieve the required site
distance.
Show on site plan. snow storage area for primary unit, off of Bridge Rd.. within lot boundanes.
Revocable Right of way permit will be required. Driveway. Landscaping.
.-''t t -,tfr'ffi- Lh77a;r /,"Q
;'7:-.r'
(\ud c;+, farr drowi11 Jn&,r!,*fu^)4 )wAuO
A^ot PntWYw+No*''ofr
w( \d,,{.- hY r? alrv tr^rM ftc, ww
Zsr qb
1s,24 FROM DEC -O r -9e , rov-OoEV-oEPr.
fi;;:ff1,,'.",,,"nn,n, s,,,rr u, uii:"lz* "'''
APPLICATION FOR DESIGN REVIEW .{PPROVAL
TOW OF VAL
C E\TER A I., NIFORMATION
ft ir uppti.orlon is tbr anl,projcct rcquiring Dcsigrr Rcview approval. Any project requiring dcsig rcvicw mu'st
rcccivc'Dc,sign Revierv approual pnor ro subnritting ibr a buitd.ing frcrmit. I;or spctific information' sse thc submittal
,uqui.emupts lbr thc particular approval thar is requcsted. Thc application cannoi bc acccptcd until all thc rcguircd
iniornrarion is submitted. Thc prolect rnay also need to be rcviewcd bv thc Torw Council and/or thc Ptanniug and
Environnrcnral Conrnrission. Design Rcview Board approval expires onc year after ftnal approval unlcss a
bnilding permit is issued :rnd construction i$ started.
DESCRIPTION OF THF- REQUEST:Review of design revisions to darby Vail ll
LOC.{TION OF PROPOSAL: Lot 7 Qlock 'l Bighom Subdivision. FILINO:
PHYSICAL ADDIIESS: 384-7 Lupile Drive
PARCELT: 210111102001 (Corrtact Eaglc Co. A.ssessors Officc at 9?0-328-8640 tbr parccl #)
D ZONN6:
Ni\lvlE OF OwNER(S;' Loftus/Nichols
MAILTNC .{DDRESS: ll?: ii;
Denver,Co. 80202
OWNER(S) SICNATURE(S) :
NAivlE OF APPLIC.\N1' The Mulhern Group
i\4.{ILINC ADDIIESS:. 1730 Blake St. Denver Co. 80209
303-297-3334
H.TVDE /\E r) EvTtr\I,- ^T \IN trtrtr.
.
' Nerv Construcrion - 3200
El Addirion - $50
prtQirlE:303-291-2200
F.
PHONE;
Construction oi a ncu' building.
Includcs any additiorr whcrc .vquarc footage is addcd to any rcsidcntial'or
cornltcroial building.
/r,nn. 'uteration -S20 lnc,ludus ntinor changcs to buildings and sitc inrprovcnrcnts. such as'
rroofing. painting. rvinclow additions. landscaping. fcrrccs artd retairling
walls. ctc.
DRi] t'ces are to bc nai.l ar rhc rirnc of subnrinal. Latcr, whcrt applying tbr a building pcrnit. plcase identiry
thc accuratc valuadon of thc prqcct. Thc To'*n ofVail rvill adjust the fcc according to thc projcct valuation.
PLEASE SI.JBMIT THIS APPLICATION. ALL SUBIVTITTAL REQUIREMENTS AN'D TIIE F'EE TO TI{E
DEP.{RTil{ENT OF COMIVIUNITY DE\:ELOPI\'ENT.75 SOUTH FRONTAGE ROAD'
VAIL. COLORAOO 816s7.
n""
'Jr.luo. #'*'rion
-U G' Nichors
,o."'*rrol
.o'sse "'::' a.te
qui:strons'f Clll ttrc t'hruurrg Stillt'$ '
79': l?$
303 -?80 -0673 p.2
DEC -a r -gE l s ! 2a FtOlil I t0u-co 'OEV-OEF? '
TO
APPLICATION FOR DESICN REVIEW APPR'OVAL
Rarbur of design rcvbions b dafty Vall ll
ffirca rcgiring Desien Ruar lgroral' A.4droicil r'$dnn! dcsigl nwicrr nus
naivc Dcsign R.rio*.*,o*t-pri-*J"-'iu]6iiigr*. nil;fip'*ilF;setttftinlirmudon'sce bon.bmiffil
trquircnarc for ,r,. errLr* .rfiil";; i*qilJ rh" ";iG; cailt bc |cccf,od 6til dl thc rcquircd
iofonnrion is s.rbmicd- Thc Fojc(r nly rlso n .l , tu ,orJ u:, u" r*n o*cil ad/u ttc Plodry and
Errvircrrmcrrte|Cornmislon.DGdFRcryit'fBFrdrppon|crprcsoncyorl'rcrfinrl'pgtovelun|cfsr
i-ifalng p.-ti* ir isrrcd erd comrttc$n! l5 trrl'lcd'
DESCRFTTON OF THE REQUEST:
B.
c.
D.
f_
H.
uocoflor.|oFFROPOSAL:btTEFellBighomsubdM€i0.FlLlNG;-..-.-
PHYSTCAL ADDRESST 184.7
t.|/phg Ddt'e
p.c,nCEL *: 21 0 I lJ 1 ulrol (Cont*t Eagtc Co' Asrcssos OfFcc ar 9t}328'86d0 for Farccl #)
NAMEOFOwNgll5l; Lofrle'Nlc'totls- '-' - " -" -- --
MArLrNc .{DDREss" tm w}nlooP st gd.{-":;.
TVro Resilental
OWNER6)SIGN.$URS6):
303-zsz{ca4 PHO.IIE:
TYPE OF REI/IEW AND FEE:
Consrucrioa ofe nor building.
Includffi atty ddidon whcru s$Erc fooqs ir rdlcd rc any rt*idsrtid'or
cont1grclal bJilrttng
i"J,rl,cs.;t*.t-Ct" to buildings rnd sic irnFtovcmstr ul.t;brs.'
-
nroofing,piminglwindot'rdditiorrlmdscaS'inE'fcnoxrldErirmlng
w6lls. glc.
DRB faEG .r! !o bc Faid.! fic,irilc of srbnrlael. I-m.wtrur rpplyinglixr brrildingpcrerirflcsc idauiry
rhc acsrarc valuniqr of;; Dtj..t ihc ?orxtr of val olU cai'E the fcc ic4ording to ltc 1r1ojcct raluatiott
PLEASE SU&VIT THIS ArruclttoN, ALL SUSIIIITIAL REQUIREnmNn;A{DTSE FEE ro TIIE
DEP'{RTMINTorcounlunnYDE}TLopMENT.?5SoUTIIFRoNTAGERoAI''
.'No{.' Coffttlctioa - 3100
o.Addirion - $50 I
U Minor Ntcrolioo - 320
VATL,COLONADO EI657.
THE MULHEnT cn],lto.
Architecture/PlanniFg
1730 Blake Street, Suite 435
DENVER. COLORADO 80202
LETilR @F T'RANSNflITTAL
FrLE:a-'2
(303) 297-3334
FAX (303) 292-2601
to
VAIL I(D E\67
YoU XAttached
drawihgs tr
of letter D
a r(
WE ARE SENDING
tr Shop
f) Copy
f) Under s6parat6 cover "" FEQ- EX the {otrowing
E Samples I Specitications Prints
Change order
Plans
cQPr65 OATE NO.DESCRIPTION ,7 f)E+ler^J Q cr,)1.-',lnN<-=
ft )Wn DAz uQu\T
(l leuQALerf trA-
THESE ARE TRANSMITTED as checked below:
EFor approvat
E For your use
I As requested
I For review and comment
tr FOR BIOS DUE
No exceptions taken (NET)
Reiected (Rel.)
Reviewed (R)
Excoptions as noted (EAN)
Revise and resubmlt (RR)
Submit spocif ied item (SS)
tr
-
tr
tr
.
tr
D
19- D PRINTS RETURNED AFTER LOAN TO US
REMARKS
SIGNED:
tl ancto.u... aat tot tt aotaat, Xlndly. notlly,
COPY TO
ut tl onca.
.?"rMurHpnx Gno.t-ro.
ARCHITECTURE o PLANNING . INTERIORS
November 13. 2000
Town of Vail
Department of Community Development
75 South Fronlage Road
Vail, Colorado 81657
Attn: Allison Ochs
RE: Architectural design revisions aatea tiltOIOO.
Dear Allison
Il9. lqllq*ils is a description of design changes made in the design revision drawings dated 11110100. Generally the more pronounced changes fall into two .it"gori"r- ine first being those deletions and shifts necessary to gain the Army -orps of Engineers a"pproval. Thrs approvar was quite frustrating since our wetland consultant was confident i-hat there'were no significant issues;yet upon visiting the site in spring, after lhe snow melted, the representative of thl Army corps of Engineers raised some issues- The corps was especially
"on""tn"J "oouiftre upnirr weilands at the jntersection of Bridge and Lupine and the smail creek to the west. We have marked these zones with a (W) for wetlands.
Second are the design changes. The most major being lhe reconfiguration of the fireplace and p:ojeded.windolvs.at the great rooms which faie lupine drive. This"change war ra.r" because l'oflus felt the previous corner projection intruded upon their unit and tney"oeilreo to viev/ t,re fire p'ace from the kitchen. Generally we perceive the other changes to be minor tweakirrg of lhe design to better fit the ownei.s lifestyles.
It is important to note that no design changes were made to reduce the cosi of this residence. All attempts were made to retain the original design intent of the building.
Sheet 41,0 Nlchols and Loftus
1 IF driveway along bridge road has been centered in the small opening between welands "A" and wellands "8" to reduce wefland impacts.2 The outdoor parking space at the northeast of the structure has been eliminated to both
- reduce wetland impacts and avoid the critical root zone for the large fir trees.3. A portion of the patio on the northwest side of the structure has been eliminated to reduce welland imoacts.
The extdrior stair on the northwest side has been reduced in size to reduce wetiand impacts.The.south unit (Loftus unit) has been shifted off of the property line to avoid welland area and existing drainage along the southeast property line.
Porlions of the deck along the southeast side of the Loftus residence has been removed to avoid welland impacts.
The connection between the deck of the two units has been eliminated to increase pnvacy and reduce the shuctures mass.
Rernoving portions of this duplex from wetland areas required both units to fit in a reduced 'southeast to northwest dimensicn. Any significant change resulting from this manipulation is noted in the ciesrgn revision set dated 1 1/.,| 0/00.
All changes that resulted in shifting the slructures position on the site was critical in gaining a nationwide permit from the Army Corp of Engineeis.
4
o-
8.
9.
1730 Blake Strcct, Suitc 435 Denver, Colorado 80202 TEL: (103) 291-3334 FAX: (103) 292-2601
Sheet A2.0 Nlchols Garden Level Plan
1 . At the northeast portion of the garage the door has been moved out 1 ' to accommodate a
larger vehicle.
2. The stair configuration has slightly altered. A closet has been added to provide additional
storage space for the residence.
3. The configuration of columns below the easl deck have been allered to accommodate a
reduced deck size.
4. A door has been added to the east wall of the south bedroom to allow access to the exlerior
oatio.
5. Configuration of the bathrooms in the southwest corner have been altered to accommodate
the new great room layout.
Sheet A2.1 Nichols Entry Level Plan
1 . The exterior stair on the entry side of the Nichols residence has been reduced in size to
minimize welland dislurbance.
2. The patio on the north end ofthe unit has been reduced in size to avoid unnecessary
wetland disturbance.3. Doors have been added to the dining room to allow access to the exterior deck.4. A spiral stair has been added to the east side of the deck to provide garden level access.5. The configuration of the exterior fireplace has been adjusted lo define outdoor rooms.6. The connection between the decks of the two units has been eliminated to orovide more
privacy and to reduce the structures overall mass.7. The small circular alcove in the great room has been shifted to the north. The original layout
of the alcove proved to inhibit privacy between the two units. The visual disruption of the
Nichols alcove from the Loftus great room was determined to be an unacceptable design
solution for the owners, especially Jim and Marilyn Loftus.
Sheet A2.3 Nlchols Roof Plan
1. Please note the clarified roof elevations. A roof plan containing both units and all associated
roof elevalions is located on sheel A2.3 Loftus.
Sheet A3.0 Nichols North and East Elevatlons
1. A prefabricated spiral slair has been added to the Nichols East elevation.2. The conflguralion of the exterior fireplace has been altered and a copper pipe added for
proper fireplace ventilation.
3. Doors have been added to the location of the dining room.4. The deck layout in front of the great room has been altered. Adding a bowed element in
keeping with the dormers.5. Window configurations that have been allered are bubbled.6. The stair at the No(h elevation has reduced in size to reduce wetland impacts.7. The deck on the Norlh elevation has been reduced in size and the double wood columns
have been replaced with single wood timber columns.8. The interaction between the bowed window on the North elevation and the shed roof differ
slightly from the original design drawings.
9. A window has been added at the bav window shown on the north elevation and is noted #"12.
The Mulhem Group, Ltd.,
1730 Btake Street, Suite 435, Denver, Colorado 80202
TEL: (303) 297 -3334 FAX: (303) 292-2601 Email: tmgden(a)ix.netcom.com
3.
The configuration of the curved glazing at the great room on the west elevation has attered.A bowed lantern has been added to thi centeiJ tn" gr""t room. see fut ronqitudinal elevations of the east and west sides following p"g" A'g.t. --- !v" '|v!'I,,"v\
The column at the patio of the west elevation "has "been altered to provide further repetition of wood on lhe north elevation.
T.he n9w configuration of the arcove at the great room is further represented on the south elevation.
The wall and foundarion at the south property line have been shifted approximatery 18,,northwards to avoid the wetlands. avoiding ine orainage on the north side of the residence was,required.by the Army corp of Engineeis. This shii in ptan causeoo-tie-i ioiions ot tne garden level lo be reconfioured.
.
E_very attempt was made to retain the original design intent of the project white makin! the shift.
A.prefabricated spiral stair has been shown on the north end of lhe plan.Other minor exterior wall revisions have been OuUUie on the olan.
2.
3.
'l' To move the structure away from the wetlands area a major portion of the unrt was shifted 18" both north and west. To accommodate this shift the glrage *"r oi."n.iona1y reduced in the easuwest direction. To regain the area rost, the g"iage-was rn"r""r"J 5,-6,, in the north/south direction.2' The new deck configuration can be seen on the plan. Note that the new spirat stair is located at the north end of the deck. Also note lhat the deck on rhe oinintioom ils etiminated to avoid the edge of the wetlands below.3 Ih",ll'q place in the great room has been relocated to the north wall to allow for views from the kilchen to the fireplace.4. Other exterior wall reconfigurations are bubbled on lhe plan.
Sheet A2.2 Loftus Uoper Level plan
1' The deck off of the master bedroom has been eliminated and replaced with a wood trellis to provide more light at lhe deck and fover.2. New configurarions on the roof resurting from rower pran changes are nored.
Sheet A2.3 Roof plan
1. All roof elevations have been noted on the drawino
All elevation revisions that resulted from the shifting of rhe floor plan have been bubbred on lhe drawing.
Additional doors and/or windows are shown and bubble on the drawino.
'Ihe Mulhem Group, Ltd.,
1730 Blake Street. Suite 435. Denver. Colorado 80202
TEL: (303) 291-3334 FAX: (303) 292-2601 Email: tmgden@ix.nctcom.com
Sheet A3.l North and West Elevatlon
1. The turret shown on these elevations has been altered to allow for a small covered area at
the front entry. A copper section has been added to the lop of the turret.2. The elevation change due to lhe reconfiguratign of the great room is bubbled on the drawing.3. Other window and door configurations have been bubbled on the drawings.
Allison, we apologize for the extent of changes however we hope that you will agree that in
making these changes we have endeavored to maintain the original design concept. This is
further exhibited by the enclosed perspective drawings.
Please do not hesitate to contact me if you are particularly concerned by any item. We will be
happy to try and address your concerns.
'ffie
Project Designer
The Mulhem Group, Ltd.,
1730 Blake Street, Suile 435, Denvet, Colorado 80202
TEL: (303) 297-3334 FAX: (303) 292-2601Email: nngden@ix.netcom.com
+ *+**** * * t* * i ** * * * ** * *** * i * * * * **,i ** *
'r',r.
* * * 'I '*
* *'r* ** **'r** * * ** * * O** * t * {.** ** * ** * * *** '**t **
TOWNOFVAIL, COLORADO'' - Srat€menr
* **+ * 't *'l {t*'t't *'} **,* *++'f **** +** * * *****+ ***'f {. *{.******* + +++*+'t***tt**+**:tr****+*:t*{r* 't ***** *** * ****lr
Statement Number: R000000231 Amount: 920.00 LL/20/20OOO4:45 pM
Pa)ment Method: Check Init: JAR
Notation: 163 05
Permit No: DR8000059 \4re: DRB - Minor Alteration
Parcel No: 210111102 0 01
Site Addreee:. 3847 ITUPfNE DR VAIIr
Lrocation:
Total Fee6: 520.00
Thie Payment: $20.00 Total AIrIr Pmts: $2O.OO
Balance: $0.00
't * ** * * *'* * * * * ** **'***** ** * * * ** * * ***'t t * * * {. ** i'}**+ ** +,|t * ** **:**** * *,} * 'i:F* {r* * *********'t* ** *** ++ * **rtrt
ACCOUNT ITEM I,IST:
Account Code DescriDtion Current Pmts
DR OO1OOOO31122OO DTSIGN REVIEhI FEES 20.00
TO\^/NOFVAIL
75 S. FRONTAGEROAD
VAIL, CO 81657
970-479-2138
APPIJICA}IT K. C. COMPA}IY
P.O. BOX 341
AVON, CO
8r620
CONTRJACTOR K.C. COMPA}IY
P.O. BOX 341
AVON, CO
8J-.620
License: 455-8
Description:Grading permit for site work and access
road construction
Occupancy:
Type Construction:V N Type V Non-Rated
Valuation: $6,000.00
Fireplace Inforrnation: Rcstricted:
AddSqFt 0
Permit #:800-0277
Status...:
Applied. . :
Issued . .. :
Expires. ..:
LO/06/2000 Phone: 97O-925-0566
TOV/Comm. Dev.
Clean-up De
FINAL
10/06/2000
10/17/2000
08/09/2001.
OI,'INER IJOFTUS,
'IAMES
R. & MARIIJYN 'J].0/05/2OOO PhONC:
- NICHOIJS, I'AURIE G. & RANDY G. 'JT
L200 17TH ST - 890
DEN\IER CO 8O2O2
1-O/06/20OO Phone: 970-926-0566
posii Refund
.-rd-<_
PreP durins aPPfOVed
amount
date
# of Gas Appliances:0 # of Gas l-ogs: 0 #of
Wood Pelleh
Building->
Plan Check->
lnvesugation->
Will CalI->
5105 . 00 Restuarant Plan Review->
$6e.25 DRB Fee---->
S0.00 RecreadonFee------->
$3.00 Clean-uPDePosit->
TOTAL FEEg->
$0.00
$0.00
90.00
$100.00
s216 .25
Total Calculated FeeF>
Additional Fees->
Total Permit Fee-->
Payments->
BALANCE DUE->
927 6 .25
$0.00
s216 .25
52"1 5 .25
$0-00
o DEPARTMENT'FC.MMUN,ST#: Ift'r"un
NOTE: THIS PERMIT MUST BE POSTED ON IOBSITE AT ALL TIMES
ADD/ALT SFR BL'ILD PERMT
|ob Address: 3847 LLIPINE DR VAIL
Location.....: 3847 Lupine Dr
ParcelNo...: 210111102001,
Project No :
lob.'
Approvals:r€e'm: 051-00 BUIIJDING DEPARTMENT
ao/o6/2000 cDAvrs Acrion:
Item: 05400 PLANNING DEPARTMENI
1-0/1-2/2000 ao Action:
released when bp issued
ITeM: O55OO FIRE DEPARTMENT
Item: 05500 PITBLIC WORKS
ao/L3/2OOO Ls Action:
DIA can be
SITE PLAN DOES NOT
s*ow coRREcr Lr'rr o"l"r*"*nc' FEN.E o* "*orro"O CONTROIJ MEASI'RES AROI'IID COIISTRUCTION SITE AND FOR SEWER
CONNECTION AREAS.
ALSO NEED 18N CI'IJVERT INSTEAD OF 12N.
to/L6/2OO0 LS Act.ion: Ap spoKE WITH RICH
CAPLES ABOIN CORRECTIONS A}ID WIIJIJ ME PROVIDE WITH NEW
SITE PI,A}I.
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an
accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and
plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning
and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable
thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4
PM.
SIGNATTJRE OF OWNERORCONTRACTOR FORHIMSELF AND OWNEF
PAGE 2
*tt!t***********{il*****{***********:*|********************H*****t**it******************1ffi*********
CONDITIONSOF APPROVAL
Permit #: 80U0277 as of 0G18-2003 Status: FINAL
***}**t*|**rt"ll"*!t-tffi ffi #*****#********:tsHffi**#ffi !k**f*****ffi
Permit Type: ADD/ALT SFR BUILD PERMIT Applied: 70/06/2000
Applicant K.C. COMPANY Issued: 70/17/2000 970-92G0566 To Expire: 08/09/2N7
fob Address: 3847 LLIPINE DR VAIL
Location: 3847 Lupine Dr
ParcelNo: 210111102001
Description:
Grading permit for site work and access prep during
road construction
***:|)*!Hiit**********rH****rH***********s*r*** COnditiOnS **********ffirffirffi
Cond:12
(BLDG.): FIELD INSPECTIONS ARE REQTIIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: L6
(BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND
EVERY STORY AS PER SEC.310.9.1 OF THE 1997 UBC.
+** t+ +* * t t i + * ++ * * * *f + * ++ * + *t t | ++* +*+ *l * tf + +++* * i +f + +t +*+** t*r* * *** * * * li * * * * r * * * * * * ++* * + * * * * *
TOWN OF VAIL, COLORADOCopy R4rlnted on llGl&2lXl3 ttl2t!1216 O6ltgtZOO3
Stat€ment
+ + +*** + *t ++ *+ +*+ * * + ++ + t +++** t * ** + + +* * t *l ++ + *+ +*$* ** + * + + + t * * *t * * * * + +* **+***'t * * i! '3* *** * * * *a*** *
Statement Nuniber I R000000059 Amount: 9276.25 aO/L7/2OOOO8:15 AIvt
Pal,'ment Method: Check Init : iIMN
Notation: RICH CAPITES
Permit No: B0O-O277 q4)e: ADD/ALT SFR BUILD PERMIT
Parcel No! 210111102 0 01
Site Addrese: 384? IJUPINE DR VAIIJ
Location: 3847 IJuDine Dr
Total Fees: 5276.25
This Payment,: 1276.25 Total" ALL Pmts: 5276.25
Balance: $0.00
* * * ** * * * * *+ ** * ** * * * * * * *** *+ * ** +* * * **+ t *f | + + f + ** f * ++ + ++ + + * * * ** ** * * * ** * * * * * ** * * * * +*** *** **r* * *
ACCOUNTITEM LIST:
Account Code DescriDtion Cur.rent Pmts
AD Dz-DEPOB CLEANUP DEPOSITS 1O().OO
BP OO1OOOO311I1OO BUILDING PERMIT FEES 1O5.OO
PF 00100003112300 PLAN CHECK FEES 68.25
t,lc OO1OOOO3112BOO WILL CALL INSPECT]ON FEE 3.()O
'li oa -:x
oi
j
r{ol2
E
(J
g
T
g q
d
a.t
H
e
6 E H
d c U
a
F.
.0
-2
{o FU o lr lr
eqt zo
dA oa
F
Ei
u E E o
H (,|
U
g I
}l
H
a
F
dt H .gt UO
r.l !
a-F
OH OA
@
AFr zz DD &o FX q4
d u
L,
F3.22 ED
F8 q|E
e,
It F.a2 {9 ix H(ql
E o
;ih
EX H|4
E H
?
H
F.
X al
lr
2
F
EC -U a!t 2A
m rta I 8H ia |<0 l' lqu cro
a
FI q|
t)
H
o
H &I !{
a z
!4
&i
I
H
:
.lD
46 T>
E.$l
rlE ac,d
H9B g.A!.
?^ [),uJ:v o
W^n,F' ri\
S\fru$) "rgn Review Action Form
TOWN OF VAIL
Project Name: Darby Vail II Project Number: pri99-0218
Project Description: new two-family residence
Owner, Address, and Phone: Loftus/nichols
1200 lTth St. Suite 890
Denver. CO 80202
303-436-9393
Architect/Contact, Address, and Phone: The Mulhern Group LTD. (Attn: Roger White)
1730 Blake St. Suite 435
Denver, CO 80202
303-297-3334
Project Street Address: 3847 Lupinc Dr.
Legal Description: Lot 7, Block 1, Bighorn Sub
Parcel Number: 2l0lll10200l
Comments: Mulitple hazard zones
Buildinq Name:
Board/Staff Action
Motion by: Bill Pierce Action: approved with
conditions
Seconded by: Melissa Greenauer
Vote: 5-0
Conditions: l. Army corps permit at B.P.
2. Tree mitigation req.d
3. Any areas labeled as "crawl space" must be <5 ft. head height and access
panels < 12 sq. ft.
Allison Ochs
l,2000 DRB Fce Paid: $200
Darby Vail II
Town Planner:
Date: March
Project Narne:
Document I
zoNE CHECK
o^,", ffi qltfn
ffi'*noon,roi@ rTlwvtft
O*ncr '
* 3t41 = 5t+1
* 174 = 77.n
AF
+
uscd wjrh this rcqucst?_
1144 /1/l r ,'tUlnD / luav
(30x33)
Front
Sidcs
20'
.t 5'
l5'ata
_M- E
Dnm it+^i al ^-^ o ,
-/o
Yrs / No
y.r-(
- Nq
l) Pcrccnt Slopc (< >30%)
Prsvious conditions ofapproval (chcck propcrry fl"l, (l ffi,
Pbonc %
Phonc
hoposcd usc lhilN
Buildablc arca I
Eristing Proposcd Total Rcmaining
4?
1n
t5 i5
^Mkhgb
l.'A I tv-
Encloscd
Proposcd Slopc ..__...--%
2) Floodplain
Architctt
Zonc district
Lot siz-c
, /, Allorvcd
rorarGRFA {h1V * 4{l --_Wo_
Prinraqy cRFA - + (425) (6zs.)- hqq
Sccondary GRFA + (12s) (675+)---WY2-
+ 615 = 425 crcdit plus 250 addition
^l Docs this rcqucst involvc a 250 .A,ddition? lV q
Horv much of rhc allorvcd 2i0 Addition is
Sitc Covcragc
Hcigbt
Sctbacks
Landscaping Minimum
Rctaining Wall Hcights
Parking
Caragc Crcdit
Drivcrvay
Rquire
Complics with TOV Liglting Ordinancc
Arc finishcd gradcs less than Z: I (50%)
Enr.i ronmcntal/I{azards
Rcar
tMo
3't6,
^ lrt u_-1J1._
(300) (600) (roo?4tr))
Is thc propcrty non-conformingl Oc;c;Ac: fi I 4
?
D ESIGN REVIE\Y CI{E CKLIST
Projcct:
I-J DUKVbY
Snel^
Bcncknark
t
. Legal dcso^iption
LOr Drzc
Buildablc fuea
Eascmcnts
Topography
Q FLooRPLANS
Scalc
GRFA
250 additional CRFA
.__ Crarvl\Atfic Spacc
trHII
Q BUILDI\TG ELEVATIONS
Scalc
Roofpitch
tr LA.NDSCAPEPLA.N
Existing trccs
Proposed trces
Legcnd
MISCELLANEOUS
Condo Approval
Tirle rcporr (A & B)
Utilify verification f orm
Photos of sitc
Buil ding mataial samplcs
C.O. Vcrificarion
Sun\Shadc AngJx
Utilities (undcrground)
Vicrv Corridors
Varianccs
Plat reshictions
100 1.r. flood plain
Watcr Coursc Sctback
Environmenhl Hazards
Trees
Utiliry Iocations
Spot clcvations
Q SITE PLAN
Scal c
Building Hg1gtr1
Encroachmcnts
Setbacks
Sitc Covcrage
Eavcs/Ovcrhangs (4')
Dccks/Balconics
Garage connection
Sitc Cndc\Slopc
Rctaining lValls
Fctrccs
Turning Radius
unvcway (acccss and gradc)
Snotv Storagc
Firc Access
ro 4u^s ipr y'aiL
THE MULHERN GROTJ'I'LId.
Architecture/PIanning
1730 Blake Street, Suite 435
DENVER, COLORADO 80202
(303) 2e7-3334
FAX (303) 2s2-26O1
ffiTTT OF TRANSNflITTAL
ffiCDJUNOSZOOO
DArE L-.2 -c->o l'o""'"'qt[113
ArrENrloN HE. rnNzL S;-zr.r'T-
^t' at./ -? Lr, Flrvr='Dt?.
FILE:3i2
WE ARE SENDING vOu dtt".tted D Under separate cover
n
L]
f.'^'U Change order
I
tr
vta
Tr
7t 6,
il )
Yt'A r L-,
the following
Shop drawings
Copy of letter
Plans Samples ! Specilications
coPrEs DATE NO,DESCRIPTION
.4 4
/'>..,EuLv /aftrJZ,
THESE ARE TRANSMITTED as checked /'pf'e*-4pprovat
/__Ll for your use
tr As requested
A-^, review and commcnt
below:
D No exceptions taken (NET)
! Rejected (Rej.)
C Beviewed (R)
Exceptions as noled (EAN)
Bevise and resubmit (RR)
Submlt specif ied item (SS)
!
D
I
I FOR BIDS DUE 19- D PRINTS RETURNED AFTER LOAN TO US
REMARKS 'E .,4[e
€oL+,
Ett t-,
.<1ru'r.'E( fiN2,
A) T/(
2<::,t4 1/77
Ltc T/c, r.-) /N
: zfi?+r l1T t2c;E-T-tt',,.tJ .>F z;11/a'1 fl)
2rP
h E c u r v,El *L-G "., .3H", -,"1"::?,' k
.-AU/\t hJ rDTt -' (ES'.:,
Date: Octobe, l' r. ,onn
'lo: Roger White; Mulhern Group
1730 Blake St., Ste. 435
Denver- CO 80202
Ph: 3 03.297.33 34. F.r"r: 301.292.260 I
From: Mark Stelle. Certified Arborisr "
Subject: Tree praservalion limits.of disttubance, 3847 Lupine Drive, Vail. CO
A site visit has been,requestedrts determine timit'of-disturbarrce guidelines for
two large evergreEn uees Iocated on a'vacant lot at 3847 Lupine Erive.
Oualitlcations:
i am an,Urban Forester/Consulting Arborist who is ccrtified:by the International
Society of Arbonculture. I have bien evaluating tbrest and landscape trees in the
Asperr and,Vail valleys fbr l0 vears.
[,irnitine condi tions:
. ]ft. g,rtdelines presented are bascd upon visual obscrvations at a recently
undisturbed site.
Scope ofwork:
a
I
A more precise means of determining the limit-of-disrurbance is a Cenitied
Arborist supervised exploratory excava-tion (not included in present scope of
work).
Deterrnining the limit-of-disturbance is only one smail pan of a
cornprehensive tree preservation program.
There is no waranty or guarantee, expressed or implied thar the sole use of
these limit-of:disturbance guidelines will avoid any problems or deiiciencies
of these trees in the futwe.
.t
5rJ'\
.*j:"::*i"-
sent'by:''rraararot.t,*a, *or*1n709263s94 10t12tss iu,o,l^h 7E7 Page 3/3
1
Page 2 of2
October I I, 1999
Mulhern Group / 3847 Lupine Dr. l
East lree:
Species - Blue spruce
Trunkd-iameter - 27inch Dbh
. Dripline radius - lSfeet
General coodition. - Above, average
Average lateral fo'liage growth rate - Sinches
Tcrminal-lcader * Live and fully:intact
Discussion: .'I'hese two tees are locared, at a transition zone witb.'l
^ ^-.1:.: ^;-:.-. lL^ *--.L ^-..l' }L^ l-:^- /- ^r..-:Ll.,, :-:-;.11.
On the south'side (towards the building) I anticipate the roors ro extend a disunce
.ot 1% to I % times the span of the dripline radius. As mention6d previously, the
only way 16, gain a more precise m€asure of root expanse is thiotrgh exploratory
excavation.
Conclusion:
I recorarnecd,s limit'ofdisturbance of not tes* than 2$ feet from the trunk of
each trec., Th;s is.1hg point at which the construdtion fence shoulcl be,insralled.
The plotted location of the buiiding foundation walt should be a direct retlection
of the wall depth, and type of shoring rcquired to maintain the integrit-v of aU
topsoihwith in tbe, limit-of-disturbancc
TOWN OF VAIL
Department of Community Development
75 South Frontage Road
Vail. Colorado 81657
970-479-2138
MX 970-479-2452
l.
2.
',J.
t:-* t- -"'
v,
a
March 2. 2000
Attn: Roger White
The Mulhern Group Ltd.
1730 Blake St. Suite 435
Denver, CO 80202
Fax: 303-292-2601
RE: Darby Vail II, the proposed two-family residence to be located at3847 Lupine Drive / Lot
7, Block I, Bighom Subdivision
Dear Roger:
The Design Review Board has approved the proposal for the new two-family residence to be
located at 3847 Lupine Drive / Lot 7, Block 1 , Bighorn Subdivision with the lbllowing
conditions:
A permit from the Army Corps of Engineers must be submitted at building permit.
A mitigation plan fbr the large trees at the northwest corner of the lot must be
submitted at building permit.
Approximately 50 sq. ft. of GRFA must be removed.
I will issue you the DRB approval form as soon as I receive plans showing the removal of 50 sq.
ft. of GRFA. You cannot apply for a building permit until new floor plans have been received.
Should you have any questions, please do not hesitate to contact me at479-2369.
Sinserelv. /a
/lr/, - fA t4Kta-lwL-
Allison Oihs
Planner II
Town of Vail
{,2 *"n"""o 'n'"*
TOWN OFVAIL
Department of Community Development
75 South Frontage Road
Vail, Colorado 81657
970-479-2 t 38
FAX 970-479-2452
Ftt t cuPy
February 23,2000
Attn: Roger White
The Mulhern Group Ltd.
1730 Blake St. Suite 435
Denver, CO 80202
Fax: 303-292-2601
RE: Darby Vail II, the proposed two-family residence and EHU to be located at 3847 Lupine
Drive / Lot 7, Block l, Bighorn Subdivision
Dear Roger:
The Community Development Department has reviewed the proposal for the new two-family
residence and EHU to be located at 3847 Lupine Drive / Lot 7, Block I, Bighorn Subdivision.
The following comments and revisions must be addressed prior to final Design Review Board
approval:
1. The Community Development Department has received your wetland delineation report.
A permit from the Army Corps of Engineers will be required at building permit.
2. The Critical Root Zone for trees is approximately 1 ft. for each inch of caliper. The large
trees at the northwest corner of the lot are indicated as being saved. However, the
structure is within this critical root zone. Please provide a mitigation plan from an
arborist describing construction methods to save these trees at building permit. This will
be reviewed by the Town's landscape architect.
3. Please indicate all roof and eave elevations (in ft.) and elevations of all architecturai
projections and chimneys Staff has determined that there is a height problem at the
southeast portion of the roof lvlaximum height is 33 ft. to existing or frnished grade,
whichever is more restrictive.
4. The driveway offof Lupfure exceeds 107o. Please adjust and revise.
{p *un""ro "^r",
5.
6.
1
Please indicate the Limit of Disturbance on the Grading Plan and Landscape Plan. This
limit must consider ali proposed grading and landscaping.
The 6" curb in the right-ofway must be flush with the ground- Please show a detail
description on the site plan.
A revocable right-of-way permit will be required for the driveway and landscaping at
building permit. One has been included for your use.
8. Please submit a geologic hazard acknowledgement form signed by the owner prior to
final Design Review Board approval.
Our digitizer is currently not working. As a result, I will need to confirm GRFA, Site Coverage,
and Landscape Area prior to buiJding permit. Please do not hesitate to contact me with any
questions or concenn at 97 0-479'2369.
Planner II
Town of Vail
coPy FIL I
Department of Community Development
75 South Frontage Road
Vail. Colorado 81657
970-479-2 t 38
FAX 970-479-2452
Allison Ochs
Planner II
Town of Vail
December 16, 1999
Rpger White
The Mulhern Group Ltd.
1730 Blake St. Suite 435
Denver, CO 80202
RE: Darby Vail II, the proposed two-family residence to be located at 3847 Lupine Drive / Lot 7, Block
i , Bighom Subdivision
Dear Roger:
The Desigrr Review Board conceptually reviewed the plans lbr the Darby Vail II residence to be located
at 3847 Lupine. The following were their comments and concems:
l. Focus on integrating the residence into the context of the neighborhood. Some of their
suggestions were:
. Using gable roof elements instead of hipped roofs.
r Changing some trim elements ro wood (i.e. white columns. windows, etc.).
r White fascia is not practical - use more alpine materials.
. Changing the palette to a more rustic and alpine context.
In general, the Design Review Board was positive regarding the massing, sighting, and general
concept of the residence. Their main concern focused on more cosrnetic applications, such as
materials. rooflines. etc.
Currcntly, Darby Vail II is not scheduled for a final Desi_en Review Board. Please submit a complete set
of pians a minimum of l0 working days prior to a scheduled Design Review Board meeting. Meetings
are scheduled for January 5'n, January l9*, February 2no, and February 16*. Please do not hesitate to
contact me with anv questions or concerns tt 910-4'79-2369.
{g *"o"t'o 'n"o
3s3Aer lcel Tr rtr t{rLr s+.reur'ri^cE 03
9.O.&4ffi'Unitr@
Date: October I l. lq99
To: Roger Whitc; Mulhcm GrouP
1730 Blalc St.. Src. 435
Denvcr, CO 8020?
Ph: 303.29?.3334. Fax: i0i.Z92'260 I
F'r.rrrr: rvl.rl€ stcrtc, t:ertiirc.l ,\tborl* UUAWEa
Subt;t, -frcc pre;crt'oriot :rt-itt u F dirrrrLr'$e' 1$rl7 l-upin.' Drivc' Voil- CO
o[.,vork;ffilti har bdln,requcrrcd ro detcro'inc linit-ofdisrurbance guidelines for
two larg? €vcrgrecrr trecs locatcd on n vu'sanv lor qt 3 tr4?'LuPiire Dr'iwc'
[.imitinq conditioos: ,.
. nrs Srrid*li:rcc prcconrei ole,b*cd'upon vistrcl nhqr.n.'olinnq' lt a. reo.ent|y'
undisttrrbed sit". N'Fi6iE Fi&iiEihcans ot.ocl€nutrrrn8 urs llt!lr!-ur-rr!s!u]u.LrLE r5 . \'!r rru\,..
..-.L,.:r. --'.-- :- - l .,,rr------.....-..---.-.:-- f-^r. iarl.'.1-J :F rtt o.ttll o-r...1 nf
rvork).. Dctctmining thc limit-of-distrubance is only onc small pan ol'a
. cogrPrEbensive trcc. prrxrcflalion program: .r r Thcrq ir no wnrrE[O/ ot EuaraElGG' cxPrGgE;J or ilnplied th;u thc sole u& oJ
these lirrrirafl icn rr-twt cl gtridalincs witl evoid'any problcms or'dc{icicncies
of thcse uees. in rhe fttture.
Spccies - Blnc sprrrce (Picea pungetrs) .
Trurrk diametcr - 37inch Dbh(Diamuw at:brcast hcight of a'5fcct)
Driplinc radius - I Tfcet
Gcncral condihou - Abovc lvcrcge
Averagc latcral,toliage gmwth'rate - 3inchcs pcr ycar
Terminal leadcr - l-ivs and fully 'intast
...^\
IFAT.J=f,.S
fee
West trec:
ffi
z2l2ilzaoA 11: 01
l
3s3t2-266r.
|16FXS 9709263594 T,ff-]ff Job757
PAGE g4
Peg.3/3
,'nr oyr PRECrsIofi rR€€
Pagc 2 of?
October I I, 1999
Muthern (houp/3847 LuPinc Dr.
East tt!G:
Specie3 - Eluc spruuE
l runtsdramcn€r - z'Tincli Dbh
Dripliss nditls - l6fcet
Gcncral cordition- Abovc,avcrags.
Average laFnl:folirgs gounh r:tc- 3inches
Tcrminallcadcr - Livc and fully inuct
otr thc. sourh sidc (towardsrhs building) I turieiponE rhc,roout. to cxtsad e diirtsrce
of | % ro I'A dmes:ilre spouof ttrc dripllneFadius; Ar msntiousl iruviously' tbe
oglly way to ggrn * -s11p plccisc mca$trc of moF erpense 'is thrOugli eXdlorafofV
excavation-
o
LE
TOWN OF VAIL
75 South Frontage Road
VaiI, Colorado 81657
970479-2100
FAX 970-479-2157
Agust 19, 1999
Roger White
The Mulhern Group Ltd"
1730 Blake St. Suite435
Denver, CO 80202
RE: Darby Vail II, the proposed nvo-family residence end EHU to be located at 3847 Lupine Drive / Lot 7,
Block l, Bighorn Subdivision
Dear Roger:
The Design Review Board conceptually rwiewed the plans for the Darby Vail II residence to be located at
3847 Lupine. The following were their comments and concerns:
l. The Design Review Board expressed concerns about the proximity of the proposed residence to tle-
large fei on the lot The critical root zone for trees is a radius equal to one foot for each inch of
caliper An artorist should be involved in the project to ensure ftat the trees rem.in-
2. The connection between the two units seenui too minute. A greater connection should be provided
3. The rnssing of the tesidence appears to be too much of a mirror innge.
4. The front door access to the secondary unit seems confising.
5.No connection between the two unib is allowed per the building code. While no connection was
shom on the plans, a connection was discussed in the meeting. Please check UBC requirements on
duplex c onstruction
Please include all roofridge and eave elevations on the site plan.
The Darby Vail II residence is scheduled for a final review by the Desigu Review Board on Septemeber 15,
1999. All comments and revisions from this letter and the previous letter must be addressed to staff s
satisfaction prior to flnal Design Review Board approval. The EHU is scheduled 1q1 pfunning and
Environmenral Commission on Septefiiber 13,1999. Please submit all changes at least ten working days prior
to the final Design Review Board meeting. Please do not hesitate to contact me with any questions or concen$
at970-479-2369.
Allison Ocbs
Planner II
Town of Vail
6.
truno"oruo
")lle
copr
TOWN OF VAIL
75 South Frontage Road
VaiI, Colorado 81657
974-479-2100
FAX 970-479-2157
August 13, 1999
The Mulhern Group Ltd.
1730 Blake St. Suite 435
Denver, CO 80202
RE: Darby Vail tr, the proposed two-famity residence and EIIU to be located at 3847 Lupine
Drive / Lot 7, Block 1, Bighorn Subdivision
Dear Roger:
The Community Development Depanment has reviewed the proposal for the new two-family
residence and EHU to be located at 3847 Lupine Drive / Lot 7, Block 1. Bighorn Subdivision.
The following comments and revisions must be addressed prior to final Design Review Board
approval:
1. Staff has noted significaDt wetland vegetation on this lot. An Army Corps of Engineers
permit ruy be required for any construction on the lot. Please submit a wetland
delineation report to both the Army Corps of Engineers and the Town of VaiL A permit
from the ermy Corps of Engineers or a letter stating that no permit is necessary must be
submitted to the Town of Vail with the building permit application.
The maximum driveway with is 24 ft. from flared end to flared end. Please revise the
driveway accessing from Bridge Road.
The driveway accessing off of Bridge Road requires 250 ft. of sight distance in both
directions because it is backing on to Bridge Rd. A hammer head turnaround may be
required if sight distance requirements are not met. Please show on site plan.
The 250 ft. of site distance is also required on the driveway accessing off of Lupine Dr. if
backing out of driveway. Please show on site plan.
The driveway accessing offof Lupine Dr. is allowed a maximum slope of l2Vo if heated,
l0% unheated. The first 10 ft. fromthe driveway side of the concrete pan mrst be at 8%
regardless ofwhether it is heated or not. Please adjust andrevise-
3.
4.
).
{gu"nuoruo
' t.
6. Parking for the EH[J- must be independently accessible and is required to be enclosed.
Please indicate all required parking spaces for both units and the EIII-.:'. Parking spaces
are 9 ft. by 19 ft. unenclosed and 9 ft. by 18 ft. enclosed.
7. Please indicate a limit of construction disturbance and some form of erosion control
This will need to be delineated in the field with a construction fence.
8. Please show on the site plan top and bottom elevations of all retaining walls and the
material they are to be constructed of.
9. Any new Landscaping proposed (trees, rocks) musr be at least 9 ft. from the edge of
asphalt.
10. Please indicate on the site plan the rnaterial of the driveway and whether or not it is to be
heated. The 4 ft. concrete Dan cannot be heated and must have a 2 inch invert.
11. Please include an exterior lighting plan along with a cut sheet of proposed fi*ures. One
light is allowed for every 1000 sq. ft. of lot area.
12. Darby Vail tr is in multiple hazard zones, including a moderate debris flow, high severiry
rockfall, and a possible avalanche in{luence zone. A site-specific geologic hazard report
must be submined with the building permit applicarion. Any recommended mitigation
mrrsl Ss approved by a registered Professional Engineer. A geologic bazard
acknowledgement form must be signed by the owner prior to final Design Review Board
approval and has been included.
Staff has reviewed the plans submitted for the Darby Vail II Residence according ro the Two-
Family Residential Zone District and the survey provided. The analysis provides the following:
Zoning: Two-Family Residential
Lot Size: 35,719 sq. ft.
EnvironmentaVHazards: Wetland Vegetation, Possible Avalanche Influence Zone,
High Severity Rockfall Zone, and Moderate Debris FIow Zone
Standard Allowed Pronosed
GRFA
East Unir
West Unit
EHU
Site Coverage
Parking
Setbacks
6386 sq. ft. (plus EHU bonus) 7020 sq. ft.
500 sq. ft.
7144 sq. ft.
7 required
20t20/t5/50
3117 sq. ft.
3441 sq. ft.
462 sq. ft.
4215 sq. ft.
please show on site plan
20120tr5/50
The Darby Vail II residence is scheduled for a concepfual review by the Design Review Board
on August 18, 1999. All comments and revisions from this letter mrst be addressed to staffs
satisfaction prior to final Design Review Board approval. Please zubmit 411 shnnges at least ten
working days prior to the final Design Review Board meeting. Please do not hesitate to contact
me with any questions or concems at970-479-2369.
Sincyely,
4/il{r,/(
Allison Ochs
Planner I
Townof Vail
Geologlc Hazard Revlew
{Date)
(Legal Des$lptlon)
The undersigned has/have read the Hazard Report, dated
19_, prepared by
lAVe understand from the concfusions that tre proposed building is tocated in a
hazxd zone, and lhere is the potential hazxd of _
reaching the proposed house, causing damage. We are prepared to accept these factrs and
request the Town of Vail Building Department grant us a permit.
(Name, Owner)
STATE OFCOLORADO )
(Name. Orner)
) ss.
)COUNTY OF
The foregoing instrument was acknowledged before me this _ day ol
19_, by known to me to be the person
whose name is subscribed to the foregoing instrument and acknowledged to me that he
executed the same for the purposes and consideration therein expressed.
fuly commission expires:
STATE OF COLORADO )
COUNTY OF
) ss.
)
The foregoing instrument was acknowledged be{ore me this _ day of 19 . by known to me to be the
person whose name is subscribed to the foregoing instrument and acknowledged to me that
he executed the same for the purposes and consideration therein expressed.
My commission expires:
cCfrmi\tEzErd
02125/2888 11:41 3A3-292-266L
W coqmission exPlres:
ll-(aam=
STATEOFCOLORADO )
couNTy o, btul llu'
-fhe lorEooino insitument was adqowl 2lzgi -uv RnM^ f- t
[ersod whose name is subscnbefd to tne foregqinE in$rumeffi €u15 acxn
he execlted the same for 6ie purposes ard consiierailon therein expre
THE MULI.€RN GROU I PAGE 62
Gtologlc tfi.aft] ftcltLilt
-February
8,2000-
-Lot 7, Block r, eighmJbdivision Firstmdition
ttfitC Oi.cdpdon)
fne utdorEqrrrcd lra:sr4 rav€ read thc 9eolagllt HsE d RaFott' dated
ttWa un&rstand ftum tne concUstsri Ua ite proposed buildins E ltt"td irr a Rock fall' Landslide'
Debris flows. and nvaranl'ne nezaro zons, ana *arb i:s tre pobntht h"-1:jt$@ardrs
H#;"ril'frA;A'fr,rs", cauing datneo- We ara rneearea t9 accept th6e fact ancl
,mror-n" ionrrof vail Bu$lrq OSparrment grant us a 94FiL /1 , | , i
(Name, Orner)(Name,
h )ss.
COUNTY OF ITTW' I
sxesrttd lhc sarnr for thc Purpo.€c end caalHa-arfon lhAt'in
iP.sl56
:tor^aYi .t$O , ,'r rr r '.-
'. -,-'F Z
i..euur-toj il.--.,--:'i
lsslon expircs:
ff.*-"-{$iis4i
i.. Puauicri ffi;d
(frrriErrl
RECETVED
NOV 0? €98
MULHERN GROT}P October 30, 1998
LOFTUS DEVELOPMENTS, LLC
1 200 17th St., Suite 890
Denver, CO 80202
Attn.: Mr. Jim Loftus
Re: Transmittal of Report on Geologic Hazards study, Lot 7, Bighom Subdivision, First
Addition, East Vail, Colorado.
Job No. 489
Gentlemen:
Enclosed are 3 copies of our report on our investigation of geologic conditions and geology-
related hazards across Lot 7 of the Bighorn Subdivision, First Addition, in East Vail, Colorado.
We conclude that the risk of debris flo,vs and flooding needs to be considered, but otherwise
geologic conditions appear to be relatively benign.
we would be happy to discuss any aspects of our report with y<iu, of course.
Yours trulv.
7101 Wesl Yale
Avenue. No 601
- Denver. Colorado 80227
303-986-6658
R. J. lrish
Consulting Engineering
Geologist, Inc.
Robt. JamFs lrish, P. G.
Consulting Engineering Geologist
Consullanl to Desrgners, Contractofs, Planners
7101 West Yale
Avenue. No. 601
Denvel Colorado 80227
303-986-6658
R. J. lrish
Consulting Engineering
Geologist, Inc.
October 30, 1998 Nov 0 2 €98
MULHTflN GROI}P
LOFTUS DEVELOPMENTS, LLC
1200 17th St., Suite 890
Denver, CO 80202
Attn.: Mr. Jim Loftus
Re: Geologic Hazards Study, Lot 7, Bighorn Subdivision, First Addition, East Vail, Colorado.
Job No.489
Gentlemen:
As requested by your Mr. Jim Loftuq the undersigned conducted an engineering geologic
reconnaissance, on October 29, 1998, of Lot 7 of the Bighom Subdivision, First Addition in the
East Vail section of Vail, Eagle bounty, Colorado. This lot, on the floor of the Gore Creek Valley
about 4 miles east-southeast of the center of Vail, straddles the cotrrmon boundary of the NW1,/4
andSW'l/4of theNEl/4NEl/4of Sec. ll,T.5S.,R.SOW.inthenortheastemquadrant,of the
intersection of Bridge Road and Lupine Drive. Gore Creek, flowing northwestward through this
sector of the valley, effectively constitutes the northeastem boundary of the lot. Interstate
Highway F70 follows the floor of the valley across Gore Creek from the lot. A single family
residence is to be constructed on this property.
Our objectives have been 1.) to generally outline geologic conditions peftinent to the
properqy; 2.) to evaluate the probable impact of those conditions on the planned construction;
and 3.) conversellt, to assess the probable impact of the planned construction activities on the
natural geologic conditions, with particular reference to geologic hazards such as landslides,
debris flows, avalanches,.and rock falls.
The ground across the property, at about El. 8380 feet, slopes gentty northeastward from
Lupine Drive to the river. Most of the property is open grassland, but a band of willows
borders Gore Creek and the narrow, shallow channel of an unnamed intermittently-flowing
tributary stream that trends northeastward along the southeastern border ofthe lot. That
(
Consu tant lo Desrgnefs. Contractors. Planners
R. J. lrish
Consulting Engineering
Geologist, Inc.
stream heads high on the northeastem-fucing slope of the valley. A large spruce occupies the
northwesEem corner of the pr+fty. The noftheastem-facing slope of the valley crests at
about El. I 1,020 feet about a mile to the southwest, thus about 2640 feet in elevation above Lot
7.
SITE GEOLOGY
Sedimentary rock strata of the Pennsylvannian-age (about 289 to 320 million years ago)
Mintum Formation constitute bedrock beneath the floor of the valley and the neighboring slopes
of the Gore Creek Valley. Although ledges of rock.crop out along the valley dopes, for the most
part the bedrock is mantled by soils derived by alluvial, glacial and slopewash processes. These
soils support dense growths of aspen along the foot of the slope of the northeastem face of the
valley in the vicinity of Lot 7 and a dense forest mainly of spruce and pine above.
The strata of the Mintum include sandstones, siltstones, and shales mainly, but also a few
prominent cliff-forming members of limestone. These strata appear to strike southeastward
and dip a few degrees southeastward, thus into the northeastem-facing slope of the valley in the
vicinity of Lot 7. These generally are weathering weakened (except the limestones that form the
cliffs) to a depth ranging from a few feet to an estimated 15 to 20 feet, but the fresh rock is
hard, strong, thin to thick bedded, and its joints typically are widely spaced. A 3g-foot to 40-
foot high cliff formed of limestone and sandstone, sited about 200 feet in elevation above the
floor of the valley, overlooks Lot 7. The apron slope below is underlain by slopewash and talus
(that is, blocks of rock that have fallen from that cliff).
Lot 7, however, is sited well away from the toe of the slope on the toe of a debris fan
deposited as multiple debris flows by the unnamed stream that flows intermittently along the
southeastem border of the property. This debris fan is about a quarter mile wide along its toe
and about 800 feet long from its apex at the base of the mountain slope to its toe. Gore Creek has
channeled through this debris fan and a combination debris fan and alluvial fun deposited by
Pitken Creek, which drains a sector of the northeastem slope of the valley across from Lot 7.
This creek debouches into Gore Creek near the northwestern corner of Lot 7, after passing
through a culvert in the Interstate Highway l-70 embankment. The soils of the debris fan
beneath Lot 7 are expected to be mainly granulan sands and gravels with a silt to clay binder.
Beneath Lot 7 these soils are likely to be less than 20 feet thick, and probably are underlain by
R. J. lrish
Consulting Engineering
Geologist, Inc.
the river-deposited sands and gravels that underlie the valley floor generally. That alluvium is
likely to be several tens of feet thick at least.
ASSESSMENT OF GEOLOGIC HAZARDS
Four potential geologic hazards are evident on and upslope from Lot 7. These include rock
fulls, landslides, debris flows, and avalanches. Only the debris flow hazard appears to be sig-
nificantly important.
Rock blocks have toppled from the rock-faced bluffthat overlooks the property, and have
scattered across the relatively steep apron slope beloru and onto the adjacent sector of the more
gently-sloped debris fan. The recurrence time for rock falls from that cliff appears to be long.
Only a few small fresh scars evidencing relatively recent detachments of rock were observed.
Lot 7 lies fully 250 feet away from the toe of that apron slope; moreover, it is partly protected
by 4 houses constructed south of Lupine Drive. Bounding or rolling blocks could follow Bridge
Road to Lot 7, however. Blocks of rock that may spall from other cliffs much higher on the
southwestem slope of the valley would be trapped by the dense forest of evergreens there.
Consequently, we consider the rock fall risk for Lot 7 to be lowl during the lifetime of ttye-
planned fucility. (
Three small block-rotational-type landslides, 2 relatively old, one quite young, have
broken away from the foot of the apron slope immediately upslope from the Bridge Road cul-de-
sac. The debris from those landslides has encroached a few feet to about 20 feet onto the top of
the debris flow. These evidence a relatively high degree of natural instability for the soils
forming the apron slope, but they are small features, and any subsequent landslides along the
apron slope are likely to be small also. Those are unlikely to travel 250 feet or more to Lot 7.
Again, Lot 7 is somewhat protected from those theoretical slides by the several homes built
between Lot 7 and the toe of the apron slope. The slopes above are densely forested, thus the
soils and bedrock there are assessed to be relatively stable. Consequently, we consider the
landslide risk for Lot 7 to be low.
I Our assessments
medium, and
quantitative
of risk are couched in qualitative, empirically-derived terms (high,
low). The state-of-the-geological-art does not permit a rational
(numerical) analysis.
R. J. lrish
Consulting Engineering
Geologist, Inc.
Many years ago the toPographic bowl at the head of the unnamed ravine that drains the
mountainside almost directly upslope from Lot 7 may have been grassland rather than densely
forested as it is now. Snow could have collected deeply there, and pedodcdly failed down the
ravine as avalanches. This has been essentially precluded by the'forest, which should anchor
the snow pack, thus the avalanche risk pertinent to Lot 7 is assessed to be low.
Since the last glacier retreated from the Gore Creek Valley at the end of the lce Age about
8000 years ago, the unnamed stream that intermittently flows down the ravine and across Lot 7
from the topographic bowl at the head of the ravine has discharged water-saturated soils and
rock debris onto the floor of the main valley. Over time, these debris flows have built a debris
fan from the foot of the slope out to Gore Creek. We have no information about the recurrence
rate ofthese flows during even the past 25 years, let alone the past 'l 00 to lO0O years, but we
do not believe the process has finally terminated. Flowage appears to have been dormant in
recent years, but may occur again at any time. Fortunately, the topographic bowl from which
the flows emanated is densely forested now, and the forest retards the development of debris
flows (source areas for debris flows typically are characterized by open, grasqy, brushy areas
on steep hillsides). Moreover, some part of a debris flow debouching onto the floor of the fan
would be deflected away from Lot 7 by the several homes built upslope on the debris fan from
the lot. Finally, any debris flows emanating from the Pitkin Creek Vatley should be effectively
blocked by the lnterstate Highway l-70 embankment, although some small part of a flow could
pass though the culvert provided for the creelg thus could flow onto Lot 7. On balance, we
assess the debris flow risk for the property to be medium.
The risk posed by potential debris flows could be reduced by re-channeling and enlarging
the channel followed by the creek, or by building small dams along the course of the ravine on
the mountain slope to retain some of the flow material and reduce its flow velocity. Either
measure would be expense, and likely would require the cooperation of the neighbo6g property
owners, the town of Vail, and possibly the U. S. Forest Service.
The creek that flows intermittently from the unnamed ravlne follows a shallow, narrow
channel across the southeastem side of Lot 7. lf that channel were to overflow, it could flood the
proPerty and the house built on it. This channel, we suggest, should be widened and deepened,
based on a design by an engineering hydrologist. Similarly, the risk imposed on the property by
flooding of Gore Creek should be assessed by an engineering hydrologist because the property
R. J. lrish
Consulting Engineering
Geologist, Inc.
appears to us to lie within the river floodplain.
The ground water level in the soils of the debris fan is likely to be at or slightly higher than
the river level.
So long as the natural ground stability across Lot 7 is not significantly disturbed by large
cuts or fills, or impoundments of natural drainage.-and these are not planned, we understand,
as a paft of' or likely to result from the construction of a private residence with its appur-
tenant facilities-the planned construction shor.rld have no negative impact on existing geologic
conditions on this or neighboring properties, and could not generate any new geologic hazards or
trigger any existing hazards. Consequently, the planned buitding activity, in our opinion, will
not increase the geology-related hazard to other properties or structures, or to public build-
ings, roads, streets, rights-of-way, easements, utilities, or facilities.
we have appreciated the opportunity to work with you on this project. rf you have any
questions, please feel free to call.
Yours truly,
A/v#,^AL/
Robt. Jam66 trish. p. G.
Cons.rlting Engineering Geologist
WETLAND DELINEATION REPORT
3847 LUPINE DRIVE EAST VAIL
EAGLE COUNTY, COLORADO
.o
ffi*"
ocroBER 8.1999
PrePared fot
THE MULHERN CROUP LTD
PrePared.by
MONTANE ENVnRONMENTAL SOLUTIONS, tr rd.
POST OFFICE BOX 361I
VAIL, COLORADO 81658
(970) 328-61s8
WETL,\ND DELINEATICN REPCRT
3847 LUPIM DRJV€" EAST VAIL, EACLE CCL.UITY, CCLCRADO
TABLE OF CONTENTS
SECTION PACE NLIMBER
II. VICINITY AND CENERAL SITE DESCRIPTION
III. WETT"\ND DESCruPNON
A I_TYDROLOCY
B. SOIS
TV. MEMODS LISED
V. R.ESOURCFS
APPENDICTS
FICURFS
FrcuRE l - slTE vtctNrTY, vNL EASI coLoRADO 7.5 MINUTE QLIAD)
FICLIRE 2 - WETLAND BOUNDARY
PHCTOGRAPFIS
I
6A iai <{>in i=LZ
E=
>H x>\JO
str
tt r.i
J
b\
a7 t-
ah
lq
a
m ('rt
UJ @ A {
|_(:
z m
f-1
f,n
m
cn,
F
rrl
r-m
(-
Z
o -\
.-
WETL\ND DELNE \TICN REPORT
3847 LUPNE DRIVL E\ST VAIL, L\CLE CCUNTY, CCLCRADO
INTRODUCTION
Montane Environmental Solutions, Ltd. (Montane) was retained by The Mulhern Group (Client)
to identify jurisdictional wetlands that mav occur on Lot 7, Bighom Subdivision I, or 3847 Lupine
Drive (Site). More specifically, a 0.8 acre undeveloped parcel located on the comer of Lupine
Drive and Bridge Road.. The Site is within the NE 1/4 Section 7, Township 5 South, Range 80
West (FIGURE l), 39 38' 27" Noah 106 ZZ' 55" Vest. [t is accessed tiom the East Vail exit from
Inrerstate 70, east on Bighom Road, first right onto Bridge Road and lett onto Lupine Drive. Lot
7 is immediately south of Gore Creek.
The delineation was conducted so that the Client may plan to avoid or minimize wetlands impacts
in the design of a residence.
I VICINITY AND GENERAL SITE DESCRIPTION
The Site is one of few remaining undoreloped parcels in a residential neighborhood of East Vail.
The Site is bordered by Bridge Road to the west and Lupine Drive to the south. Gore Creek
bisects the Site along its north boundary and a large residential home is east. The section south of
Gore Creek is the proposed homesite.
East Vail is predominantly marure aspen and lodgepole woodland with spruce nees along the
creelc Much of this area was once likely wetlands which have been significantly altered through
development into a residential neighborhood.
The Site is a dry meadow that becomes mesic toward Gore Creek at an approximate 8olo slope. The
north boundary along the creek is riparian vegetation dominated by dense willows arrd several
large spruce trees.
il. WETLAND DESCRIPTION
The largest wetland area on the Site mav be classified as a mid-gradient slope - mineral soil
wetland. This willow complex exends across the north portion of the Site and is connected with
the riverine vegetation ot Gore Creek Within the willows is a complex of sha[ow closed swales,
which are likelv remnants of historic side drainages to Gore Creek. An active side drainage to Gore
Creek tlows along the east boun&ry of the Site and is dominated by spruce and willows. On the
southwest comer ot the Site, a smaller mid-gradient - mineral soil wetland, dominated by willows,
was also delineated It is likely that the two wetland areas, while delineated separately are
hydrologica[v connected but a small upland island occurs between them.
Vlettond Delheation - 3847 Lthine Dlipe Est Vail 9/99
A.FIYDROLOCY
The hydrology of the wetland is likely from groundwater nearing the surface at the base of
the steep vallev slopes of the East Vai[ area. The alluvial aquif'er of Gore Creek connibutes
to the vegetarion closer to the creek- The elevation of the Site is approximately 10 feet
higher than Gore Creek, therefore it is not likely the creek gets above its banks onto the
Site in less than a 100ryear event.
B.so[s
There are no soil maps available fbr this part of Vail. However it is likelv the mapped soil
series would be the Forsey cobbly loam 3-127o slopes. They are welldrained soils on
alluvial fans, mounainsides, and ridges. The soil rype idendfied in the tield did not
resemble this type. It is not known whether the soil on the Site is nativ-e or imported
topsoil.
C VECETATION
The boundary of upland and wetland vegetarion was easilv determined. The central upland
area is drv and extremelv weedv with inrroduced brome. thistLes and toadflax common.
WETLAND VECETATON UPT.\ND VECEI-AIION
Sal* drummandii obl DacoUs slfinsata
Haacleum ghondlhum fac Brotrurs sP
Meftensia ciliaw obl Linaria eulgaris
Card,amine cardifo\a obl vfitrum an)ense
Ruhts id.aeus ss1 melanolaius ubL Phleum fiatense
E4uiseum arqreflse fac*Aster sP
Gennium nchz,rdscnrii factt
Smilacina stellata fac
IV. METHODS LISED
The wetland delineation methods used were in accordance with the U.S. Armv Corps oi Eneineers
Wetlands Delineation Manual, January i987. A routine on-site inspection for Areas Equal to or
Less than 5 Acres in Size'was oerformed.
Wetland boundaries were determined by the percentage cover of hydrophytic plant species
(obligate, facultative wet, and t-acuitative), indicators of wetiand hvdrology, and the presence ot
hydric soils.
The data tbr the sampling points included vegetation and hydrology indicators. Soil pits were dug
to a depth o[ 16 inches andwere used to identiiy the presence o[reduced soil conditions; depth to
WetJand. Deiineation - 3847 Lupine Dripe East Vai.I 9/99 p.Z
sanrated soil, and depth to free water.
V. R.TSOTIRCTS
l. Army Corps of Engineen (1987), Vetland Delineation Manual.
2. US Fish and Wildlife Service, National List of Plant Species that Occur in'Wetlsdrds (R€sion 8).
3. Weber, WA. (1996), Colorado Flora:(S7estem Slope), Colorado Associated University hess.
Wet)ard Dekncatiotr - 384? L42ilu h+at Ezst Vaiil 9/99 p.J