Loading...
HomeMy WebLinkAboutBIGHORN 4TH ADDITION LOT 16 LEGAL (2).pdffir,,,"*hffi", f" rtowN oF VAIL 75 S. FRONTAGEROAD VAIL, CO 81657 970-479-2138 DEPARTMENT OF COMMUNITY DEVELOPMENT NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT SFR BUILD PERMIT Permit #: B,04-01'17 JobAddress: Status...: ISSUED Location.....: 4542 STREAMSIDE CIRCLE Applied . . : 0"111612004 Parcel No...: 210112416005 lssued . .. : 0'/12312004 ProjectNo : -fR1O.\ -o Z S5- Expires. ..: 01119/2005 OI,IINER STONE, MICHAEIJ C. & EI-,IZABETOT/I5/2OO4 Phone: 3844 S ATI..AI\ITA PL TULSA oK 741-05 License: coNTRAcroR T.A. BECK RooFrNc rNc. 07/LG/20o4 phone: 9741 Titan Park Circle Littleton, Colorado License:643-S APPI-,ICANT T.A. BECK ROOFING INC. 07/16/2004 Phone: (3031 788-L426 974L Ti-t?n Park Circle Littleton, Colorado Iricense: Description: RE-ROOF TWO SMAT.,L SECTIONS OF ROOF CHANGE FROM BIIR (ROCK) ROOFING TO SIIAKES, ADD COIID ROOF SYSTEM Occupancy: Type Construction: Valuation: $9,556.00 Add Sq Fl 0 Fireplace lnlbrmation: Resticted: Y # ofGas Appliances: 0 # ofGas l,ogs: 0 I of Wood Pellet: 0 *:N+ * * *:*,t* **:t* * * *,* Building----> 9181 . 25 Restuarant Plan Review-> $0 . 00 Total Calculated Fees-> S3 02 . 06 Plan Check--> 511?.81 DRB Fee------------> 50.00 Additional Fees------> S0.00 lnvestigation-> So . o0 R€creation Fe€---------> $0 . 00 Total Permit Fee----> $3 02 - 06 Will Call---> $3 . oo Clean-up Deposit-----> $0 . 00 Pa"vme nts--------------> $3 02 . 06 TOTAL FEES--------> 9302. 06 BALANCE DUE-----> 90.00 Approvals:Item: 05100 BUILDING DEPARTI{NT o7/L6/2oo4 Js Action: AP Item: 05400 PLANNfNG DEPARTMEIfrT ILem: 05600 FIRE DEPARTI,IEIflr Item: 05500 PUBI-,IC WORKS See page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plor: plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply wittr all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, desigr review approved, Uniform Building Code and other ordinances of the Town applicable thereto. RIQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM. OF OWNER OR CONTRACTORFOR HIMSELF AND OWNER PAGE 2 i * * * * * ** * * * * * * * * * + ***,*f'F**{!**+:f*+*******{.'t*{irr**:F****:f*+:F**!*******++++*++;}*,}*r.*,i!r**:f******'N.**:f,i** *tr*{.*{.:r* CONDITIONS OF APPROVAL Permit#:804-0177 asof0'1-23-2004 Status: ISSUED +t ***+**{.*+***,F**************:f+**:t****!i:t**,}*!*************+***:t********** **:****+****+**{.*+:i***++***+****+ Permit Type: ADD/ALT SFR BUILD PERMIT Applied: 07/16/2004 Applicant T.A. BECK ROOFING INC. Issued: 07/23/2004 (303)788-1426 To Expire: 0111912005 Job Address: Location: 4542 STREAMSIDE CIRCLE ParcelNo: 210112416005 Description: RE-ROOF TWO SMALL SECTIONS OF ROOF CHANGE FROM BUR (ROCK) ROOFING TO SHAKES. ADD COLD ROOF SYSTEM ****** *!*** *** *********'**************************** conditions ****'f ****'********************'***t {. '* '} t ,} '*,t *:t,t + Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: l6 (BLDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND EVERY STORY AS PER SEC.310.9.1 OF THE 1997 UBC. + *,! * * * * * * * * * * * * * * * * + * * * * + * * * * * * * * * * * * * * * * * ** * ** * * * * * * * * * * * * * * * * * * * * ****+******** * *********** TOWN OF VAIL, COLORADO Statement +** * * * *,t * * * * * * * * * * * * * * * * * + + * + * * * * * * * * * * * * * * * * ** ** * * + * *,* * * + * ** + * * + * * * * * * * * * * * * * * * * * * * * * * ** * ** Statement Number: R040005258 Amount: $302.05 07/23/200409:07 AM Pa)rment Method: Check Init.3 DDG Notation: T.A. Beck Roofinq 10258 Permit No: BO4-OI77 Type: ADD/ALT SFR BU]LD PERMIT Parcel No: 21Oft24I6OOs Site Address: L,ocation: 4542 STREAMSIDE CIRCL,E Tota1 Feea: $3 02 .06 This Payment: $302.05 Total ALL gnts: $302.06 Balance: $0,00 * * * * * * * * * * * * * * *,f * * * * * * * * * * * * * * * * * ** * * * * * *,t * * * ** * 'i * * * * + + * + + * + * + * * * * * * * ** * * * * ** * * * * * * * ** * * * ** * ACCOUNT ITEM LIST: Accounl Code Description Curnent Pmts BP OO1OOOO31111OO BUILDING PERI4IT FEES 181.25 PF OO1OOOO31123OO PLAN CHECK FEES 117.81 I,,]C OO1OOOO31128OO WILL CALL INSPECTION FEE 3.OO APPLICATION NOT BE ACCEPTED IF INCOMPLETE OR UNS Project #: o WILL TVWNOFYIN 75 S. Frontage Rd. Vail, Colorado 81557 tl o":'f "g.FcEtvED iul r 6 ?004 CONTRACTOR INFORMATION General Contractor:1tt.Bfzg. V-u(t+tG Town of Vail Reg. No.:Contact and Phone #'s: {syr 7ts - 4s?-3)\4 Emaif address: -1-NT 1)(:c-y @ Ser:A(t:C-;W . Nf:T \ (b,rec) ?zo -47-l"tS conttactor-r,yrcl COMPLETE VALUATIONS FOR BUILDING PERMIT (Labor & Materials BUILDING:$ 9, S{U-ELECTRICAL: $OTHER: $ PLUMBING: $MECHANICAL: $TOTAL: $ For Parcel # Contact Eaqle CountyAssessors Office at 970-328-8640 or visit www.eaqle-countv.com Parye-lt -t or I z4 t <ooo5 l=Job Name: M\ff.- S{oNI---JobAddress: +S+Z 4t S{*aYy.J&)'- QtF Legal Description Lot: | (at r -".i Block: ll Filing: { '' Aiojr *ou Subdivision: Bt6 Hop$ lGr*4 Owners Name: =TotoF_ Address:Bf$g'rr, -z.634 ArchitecUDesigner:Address:Phone: Engineer:Address:Phone: Detailed description of work: FF- tre\ F TZf'-u,+rrt( hCeXLL6re ?a.;f * f(,Js P194-+J loo'(o a'<'jr: 6F \Z.Sr- . i;rf--Lf . - La;q>. -t-crrsu; coqu ?<x!' - SHer(c.sVSt WorkClass: New() Addition( ) Remodel ( ) Repair(! Demo( ) Other( ) Work Type: Interior ( ) Exterior ${ Both ( )Does an EHU exist at this location: Yes ( ) No ( ) Typeof Bldg.: Single-family ( ) Two-family ()d Multi-family ( ) Commercial ( ) Restaurant ( ) Other( ) No. of Existing Dwelling Units in this building; a-No. of Accommodation Units in this buildino: No/Tvpe of Fireplaces Existinq: Gas Appliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burning ( No/Type of Fireplaces Proposed: Gas Appliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burning (NOT ALLOWED) Does a Fire Alarm Exist: Yes ( ) No (Does a Fire Sprinkler System Exist: Yes ( ) No ( 4,4. *ir*r.*L*r.*rr*************+************FOR OFFICE USE ON LY*"*+*****+**********************-**** \Vail\data\cdev\FORMS\PER lvllTS\BLDGPERM. DOC loz'ob / oznatzooz i .1.'1 t '.t F Questions? Call the Building at479-2325 o Team tr o o u o tr o tr D D tr B B D D o Applicantt Signature: Date of submittal: ru*ffi Department of Commu nity Development Project Name:Mtgl XolrF- Project Address:4s4z S TPI-+trS lrarl <-\9, f--c:f This Checklist must be omoleted before a Buildina Permit aoolication is acepfud, All pages of application is complete Has DRB approval obtained (if required) Provide a copy of approval form Condominium Association letter of approval attached if project is a Multi-Family complex Complete site plan submitted Public Way Permit application included if applicable (refer to Public Works checklist) Staging plan included (refer to Public Works checklist) No dumoster,oarkino or material storaqe allowed on roadwavs and shoulders without written aooroval Asbestos test and results submitted if demolition is occurring Architect stamp and signature (All Commercial and Multi family) Full floor plans including building sections and elevations(s sets of plans for Multi-Family and Commercial Buildings) Window and door schedule Full structural plans, including design criteria (i,e.loads) Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family) Soils Report must be submitted prior to footing inspection Fire resistive assemblies specified and penetrations indicated Smoke detectors shown on plans Types and quantity of fireplaces shown tl \\VaiIU ata\cdev\FORMS\PERM ITS\BLDGPERM. DOC Received By: 04t02t2003 TUMYOF BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works) review and approval, a Planning Department review or Health Department review, and a review by the Building Department, the estimated time for a total review will take as long as three (3) weeks. All commercial (large or small) and all multi-family permits will have to follow the above mentioned maximum requirements. Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take three (3) weeks to review and approve. Every attempt will be made by this depaftment to expedite this permit as soon as possible. I, the undersigned, understand the plan check procedure and time frame. I also understand that if the permit is not picked up by the expiration date, that I must still pay the plan check fee and that if I fail to do so it may affect future permits that I apply for. Agreed Project Name: ./tl Date: 7/,5/ot t, NtW 3,lu{t_ F: everyone/forms/bld perm3 (vJ-'^.4 s1,.J ruwEvnV HOW DIDWE RATE WITH YOU? Town of Vail Survey Community Development Deparfrnent Russell Fonest Director, (970)479-2139 Check allthat applies. 1. Which Deparfnent(s) did you contact? Building _ Environmental _ Housing_ Admin Planning DRB _ PEC I ir 2. Wasyourinitial contactwithourstafimmediate_stow_or i no one available ? 3. lf you were required to wait, how long was it before you were helped? 4. Was your project reviarved on a timely basis? Yes / No lf no, why not?.. 5. Was this your first time to fle a DRB app_ PEC app_ Bldg Permit_ N/A 6. Please rate the performance of the staf person who assisted you:54321Name: (knowledge; responsiveness, availability) 7. Overall effectiveness of he Front Service Counter. 5 4 3 Z 1 8. What is the best time of day for you to use the Front Service Counter? 9. Any comments you have which would allow us to beter serve you nexttime? Thank you for taking the time to compleG this survey. We are committed to improving our seMce. TVWN OF MATERIAL STORAGE AND CONSTRUCTION PARKING Please read and check off each of the items below. (Copies of complete te)t are available upon request) CODE 5-2-1OI DEPOSITS ON PUBLIC WAYS PROHIBITED o Unlawful deposits: Subject to subsection C thereot it is unlawful for any person to litter, track or deposit or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any other debris or material upon any street, sidewalk, alley or public place, or any portion thereof. o Notice; Abatement: The Director of Public Works may notify and require any person who violates or causes another to violate the provision of subsection A hereof, or who has in the Director's employment a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud, dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt of said notice by the Director of Public Works. In the event the person so notified does not comply with the notice within the period of time herein specified, the Director of Public Works, or other authorized agent, may cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed from any street or alley at the expense of the notified. a Summons and Penalty: As an alternative to the notice for removal provided in subsection B above, any person who violates or causes another to violate the same, may be issued a summons to appear before the Municipal Court of the Town for said violations, and upon being found guilty of a violation hereunder be punished as provided in Section 1-4-1 of this code. o Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of this Code. (1997 Code: Ordinance 6 (L979). CODES 7-3A-1 AND 7-3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED o No person shall park any vehicle upon a street or at any other place within this Municipality in such a manner or under such conditions as to interfere with the free movement of vehicular traffic or proper street or highway maintenance. (Ord. 2(1968) $ 1) o Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a street or upon any place within this Municipality in such a manner as to constitute a violation of any section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed to be abandoned under the conditions prescribed by Colorado Revised Statutes section 42-4-1102, as amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in storage in the nearest garage or other place of safety designated or maintained by this Municipality, and the charges for towing and storage of such vehicle shall be charged to the owner of the vehicle in addition to a ten dollar ($10) impoundment charge, (Ord. 2(1968) 5 3: Ord, 28(i981) 5 1) I have read and will complv with the above code pro Position or Relationship to Project: Date Signed: ll t +(- *- --------t------l- F:/everyone/fomrs/bldpemr? Vail 2004 Vail Village and Lionshead Viltage Construction Hours Information Handout Problem Statement The Vail Village and Lionshead Village are invaluable assets to the community. Thousands of people come to Vail each year to sightsee, recreate, shop and to enjoy everything the Vail Valley has to offer. The community and merchants rely upon our guest to generate revenue. Our summer/winter guests expect a pleasant experience while in Vail. To insure that all of the proposed construction has as little negative impact on the community and on our guest as possible, the Town of Vail finds it imperative to create and implement the Vail Village and Lionshead Village Construction Hours Handout. It would be irresponsible for the Town of Vail, the and the Merchants, to not actively participate to minimize the impact of New for 2004-2006 will be the Vail Village llage areas. utility related improvements, All Construction projects and/or Bluhm Town of Vail Streetscape Coo Givens The following givens are intended to in ihe Villages: . The public's health, safety and . Adequate pedestrian, loading/ be maintained. construction lbe at all ry, vehicle, Vail !illage and MUSI The hours of Outside Construction Activity shall be as follows: - April 15-June18&SeptemberT-November19,7a.m.until Tp.m.,sevendaysaweek. June 18 thru September 10, work must end by 4:00 p.m. on Fridays. November 13 - April 1 5, 2005 work allowed within daylight hours only. - Deliveries shall be restricted to the hours of 7 a.m. to 1 1:30 a.rn. on Gore Creek Drive and 7 a.m. to 8:30 a.m. on Bridge Street. - Special Construclion delivery permits must be requested in advance, from Public Works in conjunction with Code Enforcement at Checkpoint Charlie. - No construction activity shall occur on Saturday or Sunday between June 19 and September 5. E7?7?0 --*6_.42-aq __ ___ _,yAlL co -_royyfi oF .,_ Reauested lnsoect Date: Tuesdav. Julu 27.20O4 ' Inspeiticn fuea: JRM SIF Address; <None LisFd> 4542 STREAMSIOE CIRCLE AIP/D lnbrmation Adivny: BO+0177 Typ.: A.zuID Consl TWtir: Occupcirby: OJner: STOSIE. TflCHAELC.&ELZABETHD. .JT Appticanr: TA. BECK ROOF||\IG t{C. Coflftrelof: T-A. BECX RC,OFi.|G hlc. Page 19 Request€d lnsp€€ff on(sl Item: 70 BLDc-lf,lsc. Requeslot: TA BECK ROOFING lNC. suolg: aouc Phona: 1303) 78&t.l?6 RequesFd Tlmer 08100 A[l Phorc: 7*232-4716 Ents.€d By: DGOLDEN K Sld|,3: ISSI ED hIpA,T: JRM DBscrtpdon: RE-ROoF TWO SMALI SECTIONS oF ROoF CHAN€E FROM BUR (ROCn ROCtFlilG, TO SH,A|(€S, AEIO COLD FIOOF SYSTEM Commenls: r€-roof imp€ction IsstgnedTo: JMONDRAGON AcLon:Trm€ Exp; |nsFectlon tllstrrt lEm: 10 BlDc-Fooilnftrsleel n€fi : 20 BlDGFoundatorv'Ste€t It€m: 30 BLDC-Framlno llem: 5O BLDG-tnsutatlSn Item: 60 BLDG- S h€efock llall Itiam: 70 BLDGMlsc.[em: S0 BLDGFlnal Itsn: 21 PUI$ILC Fourdalbn Pbn lsm: 22 PI.AI+ILC Srt€ Phn ftem: Ai3 PL"AI$TEMP. CJO Item: 534 PLAN - FINAL C/O REPT131 Run Id: 2L3L tl IOI,[NM Design Review Board ACTION FORM Deparlment of Community Development 75 South Frontage Road, Vail, Colorado 81657 tel: 970.479.2139 tax: 97 0.479.2452 web: www.ci.vail.co.us ProjectName: STONERE-ROOF DRBNumber: DRB040332 Project Description: RE-ROOFTWO SMALL SECNONS OF ROOF CHANGE FROM BUR (ROCK) ROOFING TO SHAKES, ADD COTD ROOF SYSTEM Participants: OWNER STONE, MICHAEL C. & EUZABET07|L6{2004 Phone: 38.14 S ATI.ANTA PL TULSA oK 74105 License: APPLICANT T.A. BECK ROOFING INC. 07lL6l20U Phone: (303) 788-L426 9741 Titan Park Circle Littleton, Colorado License: CONTMCTOR T.A. BECK ROOFING INC. 071L612004 Phone: 9741 T]tan Park Circle Littleton, Colorado License: 643-5 ProjectAddrcss: 4542 STREAMSIDE CIRCL.E Location: Legal D€scraption: Lotr 16 Block Subdivision: BIGHORN 4TH ADDffiON Parcel llumber: 210112416005 Comments: SEE CONDmONS BOARI'/STAFF ACTION Motion 8y: Action: SIAFFAPR Second By:Vote: Date of APProvah 0ilI61200a Conditions: Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s)' Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 O oays rottowingtdate of approvat.DRB approval shall not become valid for 20 Cond: 202 Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligendy pursued toward completion. Planner: Joe Suther DRB Fee Paid: $20.00 Om lnor Exterior AlteratiOs Application for Design Review- Department of Community Development 75 South Frontage Road, Vail, Colorado 81657 teli 970.479.2739 fax: 970.479.2452 web: www.vailgov.com General Informationr All projects requiring design review must receive approval prior to submitting a building permit application. Please refer to the submittal requirements for the particular approval that is requested. An application for Design Review cannot be accepted until all required information is received by the Community Development Department. The project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission. Design review approval lapses unless a building permit is issued and construction commences within one year of the approval. Description of the Request:i -(vo <OolJ-] oF (- 5-- tt o Location of the Propos atz tot: f L Block:- srooiulion' 3,iLo',^ ( 94&l' physicarAddress: 4S4Z Sflfalso€ cre. e . F-. lwe Parcef No.: 216 | lz4 t b* S (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.) Name(s) of Owner(s): Mailing Address: Owner(s) Signature(s): Name of Applicant:N. 86.(,INC Mailing Address: Fo. 'REcEf vECI li'r I 5 ",{j4 Phone: Fax: '7t9'-'t6r- 36t4 7>- 48 z- SozS Type of Review and Fee: tr Signs E Conceptual Review tr New Construction tr Addition tr Minor Alteration ( multi-family/commercial) Minor Alteration (single-family/duplex) Changes to Approved Plans Separation Request { tr tr $50 Plus $1.00 per square foot of total sign area. No Fee $650 For construcuon of a new building or demo/rebuild. $300 For an addiUon where square footage is added to any residential or commercial building (includes 250 additions & interior conversions). $250 For minor changes to buildings and site improvements, such as, reroofing, painting, window additions, landscaping, fences and ,.----.-.\ retaining walls, etc,( $20 For minor changes to buildings and site improvements, such as, \----, reroofing, painting, window additions, landscaping, fences and retaining walls, etc. $20 For revisions to plans already approved by Planning Staff or the Design Review Board. No Fee o o '*** *d. {. {. *,} * {. * * * * * r} * * *** ** * * ** *:r,*** * ***** ** * *** * ***'t ** * * {.,}** * * **'r.* ** {. 't ** **** * * * 1( * ** * '}*'r.* ** * * * * TOWN OF VAIL, COLORADO Statement t * * * **** * * * * * *** i. * * * *:* * *1.*** ** * ** * *{.** * * *i.* * * * +* **** '} *1.** * * **** * * * * 'l *{. * * *,t * * * {. * ** *'*{.** *r.**,} * Slatement Number: R.o4ooo6226 Amount: $20.00 07/1,6/200409:48 AM Payment Method: Check Inj.t : ,JS Notation: *L0257 /T.A. BECK ROOFING, INC. Permit No: DRBO4O332 TLpe: DRB-Minor Att, SFR/DUP Parce1 No: 210112416005 Site Address : Location: 4542 STRENIISIDE CIRCLE TotsaI Fees: $20.00 This Palment: $20.00 Tot.al AIrIr Hnts: $20.00 Balance: $0.00 ****tr**'|*{.*****t *!** *!t *'i * *,*** * * {. {. * ** * * * *** *** {. ** *,f,l* * * * ** * *'}* **** * * * ** * * * * * '* * * ** *** ****'} ***r. * ACCOIJNT ITEM LIST: Account Code Descniotion Curnent Pmts DR OO1OOOO31122OO DESIGN REVIEW FEES 20.00 TOI{'NM MINOR EXTERIOR ALTERATIONS TO BUILDING AND SITE IMPROVEMENTS SUBMITTAL REQUIREM ENTS General Information: This application is required for proposals involving minor exterior alterations and/or site improvements. Proposals to add landscaping do not require DRB approval gflggg they involve the addition of patios, water feafures, grading, or the addition of retaining walls. I. SUBMITTALREOUIREMENTS** D All pages of Application is complete O Checklist is completed and signed D Stamped Topographic Survey*, if applicable B Site and Grading Plan*, if applicable Q Landscape Plan*, if applicable fl Architectural Elevations*, if applicable O Exterior color and material samples and specifications. D Architectural Floor Plans*, if applicable O Lighting Plan* anil Cut-sheet(s) for proposed fixtures, if applicable D l-itle report, including Schedules A & B to veriff ownership and easements* tr Photos of the existing site and adjacent structures, where applicable. tr Written approval from a condominium association, landlord, and joint owner, if applicable fl Site-specific Geological Hazard Report, if applicable* O The Administrator and/or DRB may require the submission of additional plans, drawings, specifications, samples and other materials (including a model) if deemed necessary to determine whether a project will comply with Design Guidelines or if the intent of the proposal is not clearly indicated. Please submit three (3) copies of the materials noted with an asterisk (*). **For interior conversions with no e)fterior chanoes, the submittal requirements include a complete set of existing and proposed floor plans, a title repoft, and written approval from a condominium association, landlord, and joint owner, if applicable. I have read and understand the above listed submittal requirements: Project Name: Contractor Signatu Date Signed TOilNffi JOINT PROPERTY OWNER WRITTEN APPROVAL LETTER I, (print nanel 4/tl D StoU e..-. .a joint owner of property located at (address/legal description) 454?-S-TP*oMsro-: a-tg. E provide this letter as written approval of the plans dated which have been submitted to the Town of Vail Community Development Department for the proposed improvements to be completed at the address noted above. I understand that the proposed improvements include: I further understand that minor modifications may be made to the plans over the course of the review process to ensure compliance with the Town's applicable codes and regulations. Page 2 of L2/04128104 Buildino Materials PROPOSED MATERIALS Tvoe of Material Color Roof Siding Other Wall Materials Fascia Soffits Windows Window Trim Doors Door Trim Hand or Deck Rails Flues Flashing Chimneys Trash Enclosures Greenhouses Retaining Walls Exterior Lighting Other Notes: Please specify the manufacturer's name, the color name and number and attach a color chip, Page 6 of 1Zl04l28lo4 .t Project Application Date q--7i Project Prolect Contact Name: 2 /,--t1)^t,.L^,.'^ Jlrl."-z*Descriplaon: Person and Phone i2t ,'c : t Owner. Address and Phone: Architect. Address and Phone: Legaf Descriptio n' tot / (t , etocx Com mentsi Zone - Design Review Board Motion by: Seconded by APPROVAL DISAPPR OVAL Su m m ary: I'J h /"1,t(, Town Planner t;/ :2 . "7-l Date: (s,"t Approvar TffT,IRRRON DURRNGO la4 l r=or* so74-r- t, DttCFItrICHr sErQ'gt 10:01 No.016 P.02 J rrJ J. tqtlt l..t rovl,red g/t/01 Dnb rtprry0f,flt0t{ - AO}tn.OF Vf,rt, cor€|{lDo bAltl ,\Fpt,rcATto l^EcErrED: [|[C'DSIP ;; 0 i!''li'ert& gr Dilg t{Ecltt{g; '' ' lFrE 'rtro^t! tfllftr'i i ,','i..'";' ;fii;?#ff#.ilf,lloi'#Sffiir* &BgJtEgI_,ttuEaEUAt$E I 8. IxrtD ot lrtrvrEn: /t rrr'^u,*lLlu' , ,.Cctl*rplrrrt hvlow - lfoe coh t!11fitJ.o'.' G?u0,00, - .lfldlrr,lan t0.qn.00) lORlNcr {tt0.00) (f 0,C. AbbnRoB ! - ..,r.< rZ D. IrD0Al DESCAIDTION,-1/. iloax Ii,|;iff i!il.'i,3ll I'jlt$, r'-offi iii:ii"!i,tf,.:'ii:i;iilirii in.i"tiplll,l.:t:;,'l$i .L u ;ri i; -ti,d -XiiirEiiil;'l €/6'i I'f Lill'J " lf .i. Siirif ; illti,ff sillllT'i* -F. _-'!.. -.: lPFr{crrrt 109 firur,|nuot providc a curltaht. It.l{u,rB ot HrlI{ng llDLrcrw?,6 llddrcon r ..:.r NIFlti 0t.' uwNERS : .ErnNAlrutl& (sJ :Hdllins dsiir C9ndontnlynl lpproval t! inFlic!.blf , ,,\t,H. JJ4:I4, DIS PEE' DnF tnn t iria of ftcrr ra rubn{tgu r).t*'l|"$.tPtrpr lrr to be prrd Er :.^:I:,lppll!!!16f r ririi.,l ;iit'l!3,:irif,Fi,J.fnturo tho corioot"ttv* . VEI,UTTIOH I*;lti :i il;lii fti;iili :i*,tli;ltl "iiiighf H#,rt'!,ts3*ff itriTs JE8s ,..Kr0.00 )-,' S -5?;fb-- ltQ0,00 rr00, 00 [{00.00 0$00,00 -t1 s:,IrT#'[B[,[frffii,0,,,, *rHO I$DLICAbfo$ wItL !u lnoorrncnD Ht?tlopr owl1jn,, ,rolrtrotl L., ,t DRB - lowN oF vzrrl,COIORADO R[C'D StP DATE APPIICATION RECETT/ED : DATE OF DRB MEETING: rErs rPPLrc*fi;;;;iln "r rccEprED UlglIIL ATL REQnr**O**tlnojl:f,rroN rS SnEtrrTtED o IPPIJIESTION @: A. DESCRIPTION': | "e.rise d glUgB u !:, '..' I. B.TYPE OF REVIEW: New Construction Addition ($50.00)Conceptual Revl.ew (S0) C. ADDRESSi, -/<:'/Z <7Eiz-A//Stz>tz,,. a/)Z - VAl 1- ,. aa, €/65,) D. LEGAL DESCRIPTION: IOt /1^ B].OCK subdivision l3/1.//.pK \,/ ./-ry t4_t>i\ | T tc,/-r If property is described by a neets and bounds legal description, please provide on a separate sheet and attach to this application. E. F. G. ZONING:,.---?A.- -,' t f) tZ,zz 7- /t+a_ I V ($200.00) ,/\ Minor Alteration ($20.00) LOT AREA: If required, st,anped survey showing applicant must,Iot area. provide a current NAI{E OF Mailing APPLICANT i aA./-2/:,13,F-L L ('ctz? 3-7* t AddreSS | //=..x 3/)<a ,. 4WL),?. (t-,^ G/6za Phone ?.,2?- tt/ 6-7 NAI'{E OF APPLICANTT S REPRESENTATM i 2.44<... .'a,/zr-2r.4-i-,c.-..+z Mailing Address a ,,.2..,{ .-..25 , t1\..c.,,',,. . (a, € 1e?<> Phone (-2 "' ttoo NA}48 OF OWNERS;'l tl ( la 5 i Ec;.,?<'. -:2.:-/,"../ '\ *SIGNATURE (S) :Mailing Address z tg< s, <'/+--71 E .>/,,-.t-s, 1> ,a a4' aL/: 7<c:.'/.. / << . €?c:-/ C </ PhOne Condominium Approval if applicable../\1 4 ;r,K.DRB FEE: DRB fees, as shown above, are to be paid at the tlme of submit.tal of DRB application. Later, when applying for a building permit, please identify the accurate valuation of the proposal. The Town of VaiI will adjust the fee according to the table beLod, to ensure the correct fee is paid. FEE PAID: $ FEE SCHEDULE: VALUATION s o - $ 101000 I 10r 001 - $ 50r oo0 . $ 50,001 - $ 150,000 s150,001 - s 500,000 $500,001 - $1,000,000 I Over 51,000,000 * DESIGN RET/IET| BOARD APPRO\TAL EXPIRES ONE YII.AR ATTER FIT{AI. APPRO\IAI. I'N].ESS A BSILDING PERMIT XS ISSUED A}TD CONSIRUCrION IS STARTED. **NO APPI.ICATION WTLI. BE PROCESSED WTTEOUT OI{NER'S SIGNATqRE 1 JEE--- S( 20.00 t/ $ Bo.l-0- $100.00 $200.00 $400.00 $500.00 o o LIST OF MATERIALS LEGAL DESCRIPTION: LOT/Z' BLOCK SUBDIVISION STREET ADDRESS i ./'-;z/ 2- 5'7,z=t-A.-'/..-./ ./->/:r <r t /22 DESCRfPTfON OF PROJECT i -2-.<---':. - -2.-t-- -2- .---4*/ . r>'-,/'r).:7-! 4L 't -,.,.' ,.\,. /:> c' i.r-/' a.> The foLlowing information is Review Board before a fi-nal required for submittal to the Design approval can be given: A,BUILDING MATERIA],S: Roof Siding Other WalI Materials Fascia Soffits windows Window Trim Doors Door Trim Hand or Deck Rails Flues Flashings Chimneys Trash Enclosures Greenhouses Other LANDSCAPING: Name of PLANT MATERTALS: PROPOSED TREES TYPE OF MATERIAL COLOR '7.. ,t' 2 'L /-z- ',-r- '= <. ,/ <- T / y',l a:- Designer: Phone: Botani-cal Name Common Name ouantitv Size* //,K B- EXISTING TREES TO BE REMOVED *Indicate caliper for deciduous trees.deciduous trees is 2 inches. Indicate trees. Minimum caliper for helght for coniferous PLANr MATERIJI: Botanical Name PROPOSED SHRUBS .o.*onQ*u ouanLirv Jf EXISTING SHRUBS r U IJ}! I(.EJIV]U V .E;IJ *Indicate size of proposed shrubs. Minimrrm size of shrubJ is R r.rel Inn Square FooLaqe GROUNf COVERS soD SEED TYPE OF IRR.TGATION TYPE CR METHOD OF EROSICN CONTROL C. LANDSCAPE LTGHTING: If exterior lighting is proposed, please show the number of fixt.ures and locations on a separate lighting plan. fdentify each fixture from the lighting plan on the list below and provide the wattage, height above grade and type of light proposed. D. OTHER LANDSCAPE FEATURES (retaining walls, fences, swimming pools/ etc.) PLease specify. Indicat.e heights of retaining walls. Maximum height of walls wit.hin the front setback is 3 fee:. Maximum height of wa11s elsewhere on t.he property is 6 feet.. \t \ \-V\ lr' ll I l-\l ) s \ 0 F s s -"i :-"+ ik. $i l$ 'ff + \ F v\i ITJ PTu|ru \t \ b{ \ \_."\ :5 rt. n tf\\t N -'rfi*'rry{"'- PLEASE I.IAKE CHECK TO THE 1 5: tj'_r: r:i4 * * * * * * -l-BLrFl tfF '-..lp| f L l,liscel I aneous Cash F!-! 1-!'I TOTAL DUE: FtFtr*iF,t. * 1:t984- Hcr,:r_rnt. # Ltj. # l5:4 r::Fli.tFErELL r:0ti5TFi..trF:E: FEE Rnrountr !*nder*,J i, I tenr paid r:11 ErElBEt4 t f,f, I ElEir:l [.h.=ng'= rF lli rnF,j .:' :rg. rJlJ Rmoun t paid r:18. !:t-r-i L 1 I. .r t-HFtF{}{ V0tJ 'i,:rLr f- '-.3.j1-r i *r F,'EHTl.lFl TOIVN OF VAIL D EPA RT|\'I E)i T OF C 0 lvllvIU'{ITY D EVELO P}IENT' DATE ZCI\T\C .{.jrD A DDFJSS !'iA}S 0t 0000 4 i540 0l N30 124 t5 IINIIO L\ { 3 UTLDT\-G CO D E 0t olo0 .i?115 UMFOR.\{ ?LU!r'S L\-C CODE or oo?0.,i2.1rJ .l UNrroR-rt l\GCHlJflCr.L CODE 0l 00to {2{ l5 UNIFOfu\{ FTRE CODE 01 o:oc..2{15 lx,rnotrilrlELtru-cALcoDE | | .s-.0.m ol 0000 {2{ 15 I olie r, coDE iooKs I 0l 0$0 .115.t3 BLUE FRD{IS OtYlA.r(S) 0l oc{'l.i211I | ):ERox coPrEs/s'iuDiEs 0 | 00c{ j2ir I I PENAI.T'1 FEES / R3.[\5PECT!OI'''S 0l otcc.lt3i2 i FL,r-v lgvinv RE.cllEcx FEE lsro FE.t ttR. 0l 00(o 42i23 oFF llouRs t\isPEcTic).t FEES coNTLl CTO RS Ll C L\S ES tll5 0t 0003..1.112 0l Ctt,3O j 1330 U IT:tsK ].CLJ .01 o]?0 41413 SIGN APPLICAllON FIE ADDITION,\I, SIGNACE F;-E 15I.O] J,);R S VTC ART PROJECT DONAT]ON 0t 000c 4l{ t 3 PR,E P,TJD DESICN .C,E!'IEW IOARD TEE OI ACbT{24I2 I BUILDING-CONSTRUCTION PER}IIT COI'IPUTER DI o o z (n {n c o =o z !lrl 7 ={ E - + m Ig L-o LE l+o oct (:=-.{ O x|+Eg Po ho <l Tf o< dE ;-!q (io FE 16 mi .tl _o m = Eu m@ l-{ EE If;!; tq E" lfi l= | --{TE 3P z=o(I,2=oo z o z,O = --{4-T >fr qn R=z': *;i)z --r ^9v z.;--l c ?< 1Z Oo n eo -im 3: -.t o o> o 9" nZ >m --{ > f =m i {z m -( z IT q, rn =7<m r = =,..r e -l --l c l=3 iii o>E 3 m c)-r -n r- t- v, zl "l @l c)H '.Er el .rrt fl lsF lsr^tl tl tl rl J m t- m d {z o : -{ €z o 'n - m z I = I €2 'tl t- m z I = c (D <-c| i m l- m d €z l = I z. = {! n rO F ro I ol q,(.) (.c| 6 €z o : F x z I l*Ol \.J @ I = =c) m (D - - att U' o l' m I a --t -t I H \N)rc| z =m =G'o 5 -(D q, l- o m A (tl F 1\) (./l cr 5 (D o, =a (D z ^r J/r r a q]z =3 q)l @x 0o< "n 'n m i =-1 -t o @ m x m "1 z o tI,I -{m (,j Nj t^, tr a i! t@ tc')fil>l-l--r *l*ldlo tz l: t:lo 6l NO Nm= s ct, cf c0 =o<z9 -nz € x z I 'n o It I a m r _Tl VALUATION a lei -rl ml el I olF rl-j or -t =lq,t= I I I I '(.^' l\- ,@ l\.@ l@ -.tl ml S t$R $x 'o m E =- z o FINAL INSPECTION'S COMPLETED The belov items need to be complete before giving a permit a final C of 0. Please check off in the box provided. FINAL PLUMBING DATE: FINAL MECHANICAL DATE: FINAL ELECTRICAL DATE: T FINAL BUILDING TEMP0MRY C of 0 CERTI FICATE OF OCCUPANCY k /lL rr' --I - m l4 t-o t-'.h E l<x f t! )l I fm: -o 1.) a :t f;x .1 lri 9.ItrP o l-u h o l<iI f-m=t'1 a3 P= o.< _..ro (J<;g aio >a 7Q -n m --t * I flf=ll-=l LJ |)< L)< f-iFlr-r =pP 2== YP t- sxP N)z < u)> = qJ \J =z (D -t !FI n =-{ 9= -{ .l lt1-l m -l c kd 6< 'Tt @m --t tr =--t (! m x m TI -.{ z (- a =m :. -l/,i,. i., a c G)c,ci ?- rl'v' o o z a {n c o =o z z ,,-\ an c c 2 ! =m T z o 2=ic 3= d6 t z:-rx 3: -{o o> 2" nz >m -i> o I m -t =z m I z T c-m z. U)m z. m I tn rrl a 9)o>'l- o J @ t-r -z o @ (o o 5 5 cr- { m t-m -l €z o I l>F m ? 3 {z o 'n t- m z o n 3 -t o :z o -Tl - I 6 I = ld t€ lz lo l: L> l m o z .t1 = { l I 5 -{ I (Jl ._.1 l-r lo l: li ld lo lz lo I -F tr'r I c F I rr F 11 rr c 2 () a --l 9J = ol I r\)f\) B D F b lo o t r-lN)lor t(o l= l(a l(o l(D I ar'l,-lo | .-r t(D I l = o c1_o -5 r- a1 o t- D - =z >F .F >rn ol 4t-It kD lrl P T @Fo \.l I 1$l(, p <l (D lc-5rD @l(/)Jm -r -Tl _-?t I 5H3a 'ogd i68s ;q i1 -A-=E=-= fi ?ot E 6- =3Aeo 6'=o" (,, o:1 :r cl*-c)RE- 5i.sg ", i- or o 5o?r 3aF=(o9+o 6sg€ *E !)1f : qt -;'--f+ii Ja93 3s3'1 (/,fl= uei&i=9I ; =< =*;Ai F S;il =(_.<o-:J E:APd r E =.i 8d&i Su a 5 -,RRd fr;; € o =.{ 0) o t f J -c. 5'(o o -16 o \a :-X'J6 \s \3:.o \5 0t =o o) 6- c)t- rr1 z. --{ SJ o s-' o 'r't = cn m r n z -.t '1- m {z m @ l- :z _,rf z f' m ! -r a z m m m l< ' z l> It lr t; !I I I -t o<'n -o m a l6 PIF >lo "l I -\ €lo 8tE "]- I I m -t m J { l- a P o I I I z th c - -t z -.t _o m -.{I o x z m ll c m I tr o I -t z l z I I m t- r'l o €m r a z c z = o o o _-l o z c z : z m { |--l m : z =z x m <--t m n 'Tl t-c F z =, -r] -{ i T m rn ON fr i3 F to =zo L;c)o o<z 2 29 Io 6 4 o< S b z<n'--l o6 o 'n2z € - =I F (, =z F g t- 2 2 i (, z z =z 6 J o --t m _= a-z v tc>-<o '-\= =>t- c) € ra:9 em (o .{ r=IC -4 a< I\)--J -{ -i i t- !m ='Tt m m tJ) c @ m x t-m z m --t ttl 9. z m m t m m z m m =m r z f c =- m m 3 o -z m o x :c z rn = = m =_Tl m m a VALUATION T m =-{ z o -.t { t- m I 2 f' t-c 2 m m 6 t- - z G)N :t - f\)(tl 5 !N)F F u' 4("717 t l>,q l9 7 ft\4.-- " 'l- .-' li Z';' +ii ;;'ll- Il oz .' ll --r ^ii 9;--l o 1(-) ll 9p li -<c t i;I d6 C./.,:l ;:c,=ic)o> o o >m r'r r- t z m ;-o f --l m a)i t; = li <l ml l'r t; ft113 zl HI 1tlj b ll: 'r ll;tll tl n:t'')'r ll _.tM l'Jl!' ; ltr ,r x I I -l :l rl al 'l I I t- { rf :l cc \ z= i" 22 -{- =6):z ;:. I., +F= l; Fi;ll l=na[] ,.t88 -t m r --r :i !i .- i:: j v1e, c J --l -.{ l) L-rl U :G z:.\P.,rno <= r;J o< o:i -a!aO >l z6 o:mr+o 'tl m -{ _r l"r I ' 'r"{ l"{ l-- la\ | = .l-'l V-\ :=;lil;ii;11 F Flll lil- lillll;1,' l'lill'l il[l {tr m|c ;l: lc l'rt t< l>l-It H la I I l3 m i-r m l.: lz lo ll l>t- r II l3 t- l0 I I I I I lI rc r -r ir .'\ :i l; = b l>'= l:-F F : llr'' E lr ,+ v l,i l''. ['=*. E ,Flijli ' l=, l' l. l+[.l: 13li- l' ;.;E:q il;*=g :;qii <-;-5 -3i€fl3 r-o{Eo- 6^; ];E = (, o::t H6;,. -=Fid=3;:-'? ,'"niif;oo",t,X o-o:e- ^. - *o J 5,og=;' ct o - 3:o >(rr ,-* -9 o'lP 611 lqd.3;3 tsNti;3i ;!l\dq:iF =t \s;:::bl.- Jl,6r 91 ..\-r d -: i ;i'. lsJ[: 3l''i''.i83il{3l' '$ i 3 a l :li 3: 3 5 ::l FaisS 9l = o ., ; :;I T., I R ;;l s$;;E Fl u-' g: P nl I rD --* o m o ! It ^2 o = ur. >:ro oO 16s:-ll dlSlXl;l E ?t> -n I li o l;' lx lgl ;l{ 'll "l:lYl>l ; F I ll lll lll I z I ll li. I l-'11 z .) lz l?t- t;I. ll t= le : o o - o z :l val ;l TI >l nl :l N c --J- z i m fi f, :-o --r c)<of >'n ZO oo '<z O t!,g 3E <cx o6 zz -{\> \<lr Aw \J o m ,z m c) = =o z o '|t x tll l; l'l lol l c .- ti tr-----r----'i----1 zt . z dll plnll d-lll i, =ll 3J'll \ | l-lt I 9ll l ll | \l l$ll I s ll I l[J--It--] | z ijll lcrll .l \ lle I s[-1\'J. \ lila =ll N\\.1\lil .= o ll F t).J \ NN lfiln I ll 3l-NJ+:j-\'l'? l< \-\ : I =--7 t\ o $o o il l: ll fl ll, i ll tr o z z o F r z o m o el Ei( gi'iiN il !N\ o' ,\\"l N\!il) iid-l :i kl I Nl -t o -l I- \m =-n m m U) a m i x t-m I m z 5 € m o m z = .r z o t- = o m o ^ z a)7 z m =-Yl m m tn VALUATION -g m =z o m o z r =z o nl tn o 5 + $.'s\N p lte l! \^)q \q o i, l 6"1 { ..1 \!o a) o \A N l 0 I 0 o o 9 o o ttJ n o s q't 0 o 4- N 0 N 0 c t\| \j ll c)o z a -J c c) -{o z -lJ rrt n ={ 9z =q m I'lrl lNo l..r O l)(-) -It la\. <lYo 1., -.- 'n' ,-o -!m =I o rn x m -{o z (- 9 --t m L^.) O o --\ o rl\ I ]\ PERMIT NUMBER OF PROJECT \ -\\L-sr\DATE \ d \' '\\ JoB NAME READY FOR INSPECTION:MON INSPECTION TOWN OF REQUEST VAIL CALLER t'-=.t',9" Jlt FRI LOCATION: "\: BUILDING:PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER FOOTINGS / STEEL FOUNDATION / STEEL tr tr tr tr u tr FRAMING ROOF & SHEER PLYWOOD NAILING tr GAS PIPING INSULATION SHEETROCK tr POOL/ H. TUB NAIL tr tr tr FINAL FINAL ELECTRICAL: tr TEMP. POWER MECHANIGAL: tr HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR tr FINAL B tr FINAL tr APPROVED CORRECTIONS: tr DISAPPROVEO tr REINSPECTION REQUIRED I -INSPECTION REQUEST TOWN OF VAIL PERMI DATE T NUMBER, OF PROJECT READY FOR LOCATION: INSPECTION: JOB NAME MON CALLER TUES THUR FRI WED AM BUILDING: tr FOOTINGS / STEEL PLUMBING: O UNDERGROUND U ROUGH / D.W.V. O ROUGH / WATER E FOUNDATION / STEEL I.Ii. I. tr FRAMING n BOOF & SHEER " PLYWOOD NAILING O GAS PIPING tr INSULATION tr tr tr POOL / H, TUB tr SHEETROCK NAIL tr FINAL O FINAL ELECTRICAL: D TEMP. POWER MECHANICAL: tr HEATING D ROUGH O EXHAUST HOODS O CONDUIT tr SUPPLY AIR o tr FINAL tr FINAL tr APPROVED CORRECTIONS: tr DISAPPROVED tr REINSPECTION REOUIRED DATE INSPECTOR PERMIT NUMBER OF PROJECT 1 DATE -INSPECTION REQUEST TOWN OF VAIL READY FOR LOCATION: - JOB NAME --- CALLER INSPECTION: MON TUES WED THUR FRI AM PM BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER tr FOUNDATION / STEET- tr FRAMING n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING tr INSULATION tr POOL / H. TUB D SHEETROCK NAIL tr tr E FINAL tr FINAL ELE ET EF oc o CTRIGAL:MECHANICAL: TEMP. POWER tr HEATING ROUGH tr EXHAUST HOODS CONDUIT tr SUPPLY AIR tr FINAL tr FINAL B APPROVED tr DISAPPROVED tr REINSPECTION REOUIRED CORRECTIONS: DATE INSPECTOR PERMIT NUMBER OF PROJECT INSPECTION REQUEST TOWN OF VAIL DATE JOB NAME CALLER INSPECTION: ":* TUES WED THUR FRI READY FOR LOCATION: AM PM BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND D ROUGH / D.W.V. tr ROUGH / WATER tr FOUNDATION / STEE- tr FRAMING ". ROOF & SHEER ., PLYWOOD NAILING tr GAS PIPING tr INSULATION tr POOL / H. TUB tr SHEETROCK NAIL o tr tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: tr HEATING tr tr o ROUGH tr EXHAUST HOODS CONDUIT tr SUPPLY AIR D FII(AL D FINAL tr APPROVED CORRECTIONS: tr DISAPPROVED D REINSPECTION REQUIRED ; DATE .INSPECTOR PERMI DATE INSPECTION REQUEST TOWN OF VAIL T NUMBER OF PROJECT JOB NAME CALLER READY FOR INSPECTION: MON TUES WED THUR FRI AM PM LOCATION: BUILDING: D FOOTINGS / STEEL PLUMBING: tr UNDERGROUND D ROUGH / D,W.V. tr ROUGH / WATER tr FOUNDATION / STEEL D FRAMING _ ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING E INSULATION tr POOL / H. TUB D SHEETROCK NAIL tr D FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: O HEATING tr tr tr ROUGH tr EXHAUST HOODS CONDUIT D SUPPLY AIR tr FINAL tr FINAL tr APPROVED CORRECTIONS: tr DISAPPROVED tr REINSPECTION REQUIRED DATE INSPECTOR I \,.rq t PERMIT NUMBER OF PROJECT rl rr-TilISPECTION TOWN OF lr _\t3 jttr-r"-) "-,-4 1,..{1-,c REQUEST VAIL JOB NAME CALLER READY FOR INSPECTION:MON TUES WED THUR FRI AM, PM .i DATE :( t . BUILDING: tr FOOTINGS / STEEL PL EI tr tr tr n tr UMBING: tr FOUNDATION / STEEL UNDERGROUND ROUGH / D.W.V. ROUGH / WATER tr FRAMING ,_ ROOF & SHEER " PLYWOOD NAILING GAS PIPING tr INSULATION POOL / H. TUB d sHeernocK NAIL :),+' n tr FINAL tr FINAL ELE ol trF tr( E CTRICAL:MECHANICAL: TEMP. POWER tr HEATING ROUGH tr o tr EXHAUST HOODS CONDUIT SUPPLY AIR tr FINAL tr FINAL .- - E/,APPROVED T COBRECTIONS: tr DISAPPROVED O REINSPECTION REQUIRED INSPECTOR INSPECTION REQUEST TOWN OF VAIL PERMIT NUMBER OF PROJECT DATE ', .,, , JOB NAME CALLER INSPECTION: MON TUES WED THUR FRI AM PM READY FOR LOCATION: BUILDING: tr FOOTINGS tr FOUNDATI tr FRAMING / STEEL PLUMBING: tr UNDERGROUND O ROUGH / D.W.V. O ROUGH / WATER ON / STEEL D D tr tr ROOF & SHEER PLYWOOD NAILING O GAS PIPING INSULATION tr POOL / H. TUB SHEETROCK NAIL tr D D FINAL O FINAL ELECTRICAL:MECHANICAL: O TEMP. PO WER tr HEATING O ROUGH O EXHAUST HOODS D CONDUIT tr SUPPLY AIR tr FINAL tr FINAL tr APPROVED CORRECTIONS: C] DISAPPROVED tr REINSPECTION BEOUIRED DATE INSPECTOR INSPECTION TOWN OF t : REQUEST VAIL .PERMIT NUMBER OF PROJECT DATE JOB NAME MON CALLER TUES THUR FRI READY FOR LOCATION: INSPECTION:.\PM AM WED BUILDING: O FOOTINGS / STEEL PLUMBING: tr UNDERGROUND E ROUGH / D.W.V, tr ROUGH / WATER D FOUNDATION / STEEL tr FRAMING rr ROOF & SHEER " PLYWOOD NAILING D GAS PIPING O INSULATION tr POOL / H. TUB N SHEETROCK NAIL D C O FINAL tr FINAL ELECTRICAL: T] TEMP. POWER MECHANICAL: O HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR D o tr FINAL D FINAL tr Rppnoveo CORRECTIONS: tr DISAPPROVED tr REINSPECTION REQUIRED INSPECTOR o PE tNs CTION REQUEST TOWN OF VAIL PERMIT NUMBER OF PROJECT DATE 'JOB NAME INSPECTION:MON WED THUR FRI CALLER TUES PM AM READY FOR LOCATION: BUILDING: tr FOOTINGS / STEEL PLUMBING: O UNDERGROUND tr ROUGH / D.W.V.O FOUNDATION / STEEL O FRAMING tr ROUGH / WATER n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING tr INSULATION tr POOL / H. TUB O SHEETROCK NAIL tr D D tr FINAL tr FINAL ELE OT I,J F trC o CTRICAL:MECHANICAL: TEMP. POWER tr HEATING ROUGH tr EXHAUST HOODS CONDUIT tr SUPPLY AIR tr FINAL tr FINAL tr APPROVED CORRECTIONS: tr DISAPPROVED O REINSPECTION REQUIRED DATE INSPECTOR FINAL INSPECTION'S COMPLETED The below items need to be complete before giving a permit a final C of 0. P'l ease check off in the box provjded. FINAL PLUMBING DATE: n FINAL MECHANICAL DATE: FINAL ELECTRICAL FINAL BUILDING CERTI FICATE OF OCCUPANCY TEMPOMRY C of O DATE: rX )<>+r tx E<)k l ---E -l o m I4 LO t--., h E l<x f t.I, >: t Im: 6 19* =t;t o l: + -.r t,-:..: ; ft l^r in O l< -r I f-: lrl =f-r =!= o< dE -o (io c!>t 7-e iri 3 o 'r1 m = =FF 2== YP tr-.]f-Fl L rr rl<l IF IK3 P lNc c \'== E=3 yz (D Z(\ n R<z ,.! ;>6z -r^9l o \J -E z.r 3= =1 Z (J6) 8F z;;0 >; -to o>nr o 2a lm nz >m --t >or _r =m =z m (- z 3 IT |-n =i{trl t- =2 aJ- m rrl @A o>'t- --t F F F rD r qt ?- l =z T F c+5 m -m d €z o l = m z I 4 + €z -Tl r m 2 3 6 €z I = I d €z o I F $z ! 3 -t m t-rl '|I n .J D d €z o I - F z I ;- Ca) + I = C rn I m =m ^: z U''-l o ..i q =l ol I N)f\) I = o g m F t\)c't \o =c (o (D af 'n rD -I ID D t+ - =- :t - (tl (l) I t\) =7 (D 6 5 |. m (tl G) U) (-|. (D 5- (D 5 w ..r. ='o ltt F ={ 9z lq mil cJl <ii N)11 co<'o rO -r co r;!! =-l _-1 o rn m x m -.t o z o @ U'f n!, 'y',(, 'l ,)', n .tr t p F,J trf F It r o o z a {n c o {o z -o) o -;H3d 'op-d 3 699 oR ii*6-ie;+ Y =0r O =:E**=*€ E f*: * i a; g H Q 3.a +aB;(og+o deg€*-o or ! d-B;$ ;'a: d < o =. --f-o o *qr3l= 5eil8 i=sP @3oL 3 P.D 1 fiF= E=frq <o-: E:A P 6"q5'Ei s H d* 3u a =-@qRd *oi€u 9P =.,;' o - o I lc)rtr rlm o rl> s.tl-z o il- :rlE *rl :tl-{ x llo o t..pE \t. Ct C +.>1 \o \\= 0\ h3 c\cs.'\ " o-\ld Fr o p'8 ,NO Yci o E I gl g - ,a f AI = 0) = o z o .tl z a t- I z -l I z m I t-c m fio<!'n! t-m :19 x lq)-[ r I o r u fl m :i € t-- n o o ! TI -n r.o t\) a or I (f,)O I F I (o =z r rt m t -1 a z m m m lz 12 -It lr a :r c -t IO m€ TF -z za I-'' z i z>o8 Io !< '..i.1 <;-ol m @o z C z = I tt tt z m { t- m --t -z = x x x m P - x )<!o --{ !m o 'n c a -z l>g ro r lE; E* I r-r! !J ;l=P !e lo9 ; 7, l"f o 6 4 l'!o= = b lztt, l=-n 2 z t"F t>i lF..l>rF>lf;l N@= llNm=trl i-:lol 5 -Fnf v <gl = BI FI tl F I (, t< N) (, \l L) =z F @ F =z m (t ='- Ft^iF er# 5F ii=iE 5e q'f 9,F iE =E "rl ll Fh roE 'ot oF. l.>bo ;F t: .o t? .(o Po ro NJ po t\,1 -t r m =. 'Tl m m a, c o m x m z c m I m L 2 m m € m m i z 'n m m m z t- t-c o z tn t-m o I ; l- l- z -m - c t- 2 m --{ m 3 =11 m m U) VALUATION T m 7 =i z o -.t --{ r- 3 m o 2 =z m t-m o ^t- =o ! o (Jr o O tr F 'l ^)) o \)3 D f){i'tl l\) (.'l C'u)F o N + (tl N)\l uft_,v747 b S/aa/gt /t4.R.r -l- ' + T NUMBER OF PROJECT INSPECTION REQUEST TOWN OF VAIL PERMI DATE JOB NAME READY FOR LOCATION: INSPECTION: CALLER MON TUES THUR FRI WED AM PM BUILDING: q FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER tr FOUNDATION / STEEL tr FRAMING - ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING D INSULATION tr tr tr POOL / H, TUB tr SHEETROCK NAIL tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: O HEATING tr tr tr ROUGH tr EXHAUST HOODS CONDUIT O SUPPLY AIR tr f,rNAL tr FINAL F'APPROVED CORRECTIONS: D DISAPPROVED D REINSPECTION REQUIRED ' ) ,,1J 1-! INSPECTCJR INSPECTION REQUEST TOWN OF VAIL PERMI DATE T NUMBEB OF PROJECT '-l "OB NAME CALLER READY FOR LOCATION: INSPECTION: MON TUES WED THUR' FRI AM PM BUILDING: D FOOTINGS / STEEL PLUMBING: O UNDERGROUND D ROUGH / D.W.V. tr ROUGH / WATER tr FOUNDATION / STEEL tr FRAMING _ ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING tr INSULATION tr POOL / H. TUB tr SHEETROCK NAIL D D tr tr FINAL D FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: tr HEATING D tr tr ROUGH tr EXHAUST HOODS CONDUIT tr SUPPLY AIR tr tr FINAL tr FINAL tr APPROVED CORRECTIONS: tr DISAPPROVED tr REINSPECTION REQUIRED LIAIE - INSPECTION REQUEST TOWN OF VAIL PERMI DATE T NUMBER OF PROJECT INSPECTION:MON WED THUR FRI JOB NAME READY FOR LOCATION: CALLER TUES PM AM BUILDING: tr FOOTINGS / STEEL PLUMBING: O UNDERGROUND tr ROUGH / D.W.V. D ROUGH / WATER tr FOUNDATION / STEEL tr tr FRAMING ROOF & SHEER PLYWOOD NAILING tr GAS PIPING tr INSULATION tr SHEETROCK N POOL/ H. TUB NAIL tr tr D D FINAL O FINAL ELECTRIGAL: tr TEMP. POWER MECHANICAL: tr HEATING tr tr tr ROUGH D EXHAUST HOODS CONDUIT tr SUPPLY AIR g F|NAL D tr FINAL F neenoveo CORRECTIONS: D DISAPPROVED tr REINSPECTION REQUIRED DATE 'l i: Yt'1 INSPECTOR". INSPECTION REQUEST TOWN OF VAIL PERMIT NUMEER OF PROJECT DATE UALLEFI READY FOR INSPECTION: MON TUES WED THUR FRI AM PM LOCATION: BUILDING: EI FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER O FOUNDATION / STEEL O FRAMING n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING tr INSULATION tr POOL / H. TUB tr SHEETROCK NAIL tr D tr FINAL tr FINAL ELECTRIGAL: tr TEMP. POWER MECHANICAL: O HEATING O ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR tr FINAL N FINAL tr APPROVED CORRECTIONS: tr DISAPPROVED E REINSPECTION REQUIRED DATE INSPECTOR READY FOR INSPECTION: t SPE \r,)-, \ -'*'..' CTION TOWN OF REQUEST VAIL CALLER WED THUR FRI PM AM \ \r-'\ LOCATION: PERMIT NUMBER OF PR BUILDING: O FOOTINGS / STEEL PLUMBING: tr FOUNDATION / STEEL tr UNDERGROUND O ROUGH / D.W-V, tr ROUGH / WATER O FRAMING ,_ ROOF & SHEER " PLYWOOD NAILING O GAS PIPING tr INSULATION tr POOL / H. TUB ,!.,*".ernocK NArL D tr O FINAL D FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: tr HEATING tr ROUGH tr EXHAUST HOODS O CONDUIT tr SUPPLY AIR tr D tr.FrML tr FINAL ROVED D DISAPPROVED n RFINSPFCTTON Fttr.)r IFttrn CORRECTIONS: INSPECT INSPECTION REQUEST TOWN OF VAIL PERMIT NUMBER OF PROJECT DATE JOB NAME CALLER READY FOR INSPECTION: MON TUES WED THUR FRI AM PM LOCATION: BUILDING: D FOOTINGS / STEEL PLUMBING: D UNDERGROUND O ROUGH / D.W.V. tr ROUGH / WATER tr FOUNDATION / STEEL tr FRAMING - ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING D INSULATION D POOL / H. TUB tr SHEETROCK NAIL tr D D FINAL tr FINAL ELE OT trF DC tr- CTRICAL:MECHANICAL: TEMP, POWER D HEATING ROUGH tr EXHAUST HOODS CONDUIT D SUPPLY AIR tr FINAL tr FINAL O APPROVED CORRECTIONS: tr DISAPPROVED D REINSPECTION REQUIRED DATE ,INSPECTOR INSPECTION REQUEST TOWN OF VAIL PERMIT NUMBER OF PROJECT DATE JOB NAME CALLER READY FOR INSPECTION: MON TUES WED THUR FRI AM PM LOCATION: BUILDING: tr FOOTINGS tr FOUNDATI tr FRAMING / STEEL PLUMBING: tr UNDERGROUND ON / STEEL tr ROUGH / D.W.V. tr ROUGH / WATER - ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING D INSULATION tr SHEETROCK tr POOL / H. TUB NAIL tr tr tr D o FINAL FINAL ELECTRICAL: D TEMP. POWER MECHANICAL: D HEATING tr tr tr ROUGH tr EXHAUST HOODS CONDUIT tr SUPPLY AIR tr FINAL tr tr FINAL .tr APPROVED CORRECTIONS: tr DISAPPROVED tr REINSPECTION REQUIRED INSPECTOR o T NUMBER OF PROJECT INSPECTION REQUEST TOWN OF VAIL PERMI DATE READY FOR LOCATION: INSPECTION: JOB NAME MON CALLER TUES WED THUR FBI PM BUILDING: tr FOOTINGS / STEEL PLUMBING: tr FOUNDATION / STEEL tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER tr FRAMING i - ROOF & SHEEF " PLYWoOD NAtLING D GAS PIPING tr INSULATION tr POOL / H. TUB tr SHEETROCK NAIL D tr tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: tr HEATING D u tr ROUGH tr EXHAUST HOODS CONDUIT O SUPPLY AIR tr tr FINAL tr FINAL EI APPROVED CORRECTIONS: tr DISAPPBOVED tr REINSPECTION REQUIRED DATE INSPECTOR o PERMIT NUMBER l OF PROJECT INSPECTION REQUEST TOWN OF VAIL DATE INSPECTION: JOB NAME MON CALLER TUES THUR FRI READY FOR LOCATION: WED AM PM BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V.tr tr tr ri,:-. tr tr FOUNDATION / STEEL FRAMING tr ROUGH / WATER ROOF & SHEER PLYWOOD NAILING D GAS PIPING tr POOL / H. TUB SHEETROCK NAIL tr D tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: O HEATING E tr tr ROUGH tr EXHAUST HOODS CONDUIT O SUPPLY AIR tr tr EINAL O FINAL O APPROVED CORRECTIONS: tr DISAPPROVED D REINSPECTION REOUIRED DATE ,-, INSPECTOR INSPECTION REQUEST .TOWN OF VAIL PERMI DATE T NUMBER OF PROJECT JOB NAME CALLER READY FOR INSPECTION: MON TUES WED THUR FRI AM PM LOCATION: BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER tr FOUNDATION / STEEL tr FRAMING - ROOF & SHEER .- PLYWOOD NAILING tr GAS PIPING D INSULATION tr POOL / H. TUB tr SHEETROCK NAIL tr tr tr FINAL D FINAL ELEi trT trR trc tr_ CTR!CAL:MECHANICAL: TEMP. POWER tr HEATING ROUGH tr EXHAUST HOODS CONDUIT tr SUPPLY AIR tr FINAL tr FINAL tr APPROVED CORRECTIONS: tr DISAPPROVED D REINSPECTION REOUIRED DATE INSPECTOR INSPECTION REQUEST TOWN OF VAIL PERMIT NUMBER OF PROJECT JOB NAME UALLEF{ INSPECTION: MON TUES WED THUR FRI DATE READY FOB LOCATION: AM PM BUILDING: N FOOTINGS / STEEL PLUMBING: tr UNDERGBOUND tr ROUGH / D.W.V. tr ROUGH / WATER tr FOUNDATION / STEEL tr FRAMING - ROOF & SHEER " PLYWooo NAtLING tr GAS PIPING tr INSULATION tr POOL / H. TUB N SHEETROCK NAIL - EI tr tr tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: D HEATING D EI o ROUGH tr EXHAUST HOODS CONDUIT D SUPPLY AIR tr tr.FINAL tr FINAL .b RppRoveo , CORRECTIONS: tr DISAPPROVED tr REINSPECTION REOUIRED -) DATE INSPECTOR I Jole rNsPtTroN REeuESr INSPECTION: D | , TOWN OF VAIL bp r,'tc-ol vv--avl \ttl cALLER NIE tJ I TUES IWEU THUR FRI TI /-\+\----/ l) ( v ',-)J:<.i di hJ- r '"Y-i,- \- \ AM PM PERMIT NUMBER OF DATE \ READY FOR LOCATION:t-MON rd-- BUILDlNG: tr FOOTINGS / STEEL PLUMBING: tr FOUNDATIONI / STEEL E UNDERGROUND O ROUGH / D.W.V. tr ROUGH / WATER tr FRAMING tr tr ROOF & SHEER PLYWOOD NAILING tr GAS PIPING INSULATION tr POOL / H. TUB tr SHEETROCK NAIL r tr tr FINAL E FINAL ELECTRICAL: O TEMP. POWER MECHANICAL: tr HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT D SUPPLY AIR tr (r'*o,-FINAL (ppnoveo -n O DISAPPROVED tr REINSPECTION REQUIRED CORRECTIONS: oorc l- 2e -Fl rNSpEcroR PERMI DATE T NUMBER INSPECTION REQUEST TOWN OF VAIL OF PROJECT JOB NAME INSPECTION:MON CALLER TUES WED THUR AM PM READY FOR LOCATION: FRI BUILDING: tr FOOTINGS tr FOUNDATI D FRAMING / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V- tr ROUGH / WATER ON / STEEL _ ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING tr INSULATION - tr POOL / H. TUB tr SHEETROCK NAIL - tr otr tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: tr HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR trtr tr FINAL tr FINAL tr APPROVED CORRECTIONS: tr DISAPPROVED D REINSPECTION REQUIRED INSPECTOi DATE ?A/ /--., "t b INSPECTION REQUEST TOWN OF VAIL PERMIT NUMBER OF PROJECT DATE CALLER MON TUES WED THUR FRI AM READY FOR LOCATION: INSPECTION: l*t- / O.l,tt ,t L d al-,, BUILDING: tr FOOTINGS / STEEL PLUMBING: E] UNDERGROUND D FOUNDATION / STEEL tr ROUGH / D,W,V D FRAMING N ROUGH / WATER n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING C INSULATION tr POOL / H. TUB tr SHEETROCK NAIL tr tr tr ,,*o, (u ,/ C tr FINAL ELECTRICAL: D TEMP. POWER MECHANICAL: tr HEATING D tr o ROUGH tr EXHAUST HOODS CONDUIT tr SUPPLY AIR D tr FINAL D FINAL !neenoveo CORRECTIONS: D DISAPPROVED tr REINSPECTION REQUIRED FINAL INSPECTION'S COMPLETED The below items need to be complete before giving a permit a final C of 0. Please check off in the box provided. N ry FINAL ELECTRICAL o,^roc..-.\ \\ \----'- \_ _Iidl'!g ss.rr: \r\ \rr\ . DATE,\a5r, ab_lb_ FINAL BUILDING DATE: TEMPOMRY C of O \N\\ \-q,\\:s \}\ FINAL PLUMBING FINAL MECHANICAL CERTIFICATE OF OCCUPANCY \'\ ^'\ -INTER-DEPARTHENTAL REV I E!^| PROJECT: DATE SUBMiTTED: CO}IYENTS NEEDED BY: BR]EF DESCR]PTION OF THE PROP Cornments: DATE OF PUBLIC HEARI NG :srh,tcr-Lkcr,eL>-{i Date e Date 8A A 'Dz,+/P+G. Fe+.t €t:tszr*(" C Pur gurzv€9 /.+,Fa a:,., Srze Pa,-,(, ,*rr, p,,-",'*,) : 6 D"''ur-^'/ (o. *2t zl€-v (.,r/.JG e,trsrz,) 6 t)y?L I rv f€\,t,r.i:*a._. G n*, / /OU # O !/G,-,ea, f lzarnqv ru."rJ f @ FZooo tr ",_(.>) rrnr oEpflnrrlil'|E//-'16 gtce..4c(ttt€7"2c *^, (Jztcrtr f "o-*,"' ('ta" hz- ('-;) Reviewed by: Conments: POLICE DEPARIMENT P.evievred by: Coments: Date RECREATICN DIPARTI,IENT Reviewed by: Comnents: { f*..r t u Qeno{, Da te RI c l lA f{ot,:T.:.1}' ryt, Vail, Colorado 81657 Phono 176.5012 Donvor Lino. 244'1521 rNc. \ \ iSiiit:r'$i?N ! ..t"i" l;t.ii]fiivi.::;iiN itl '/ (€. \ d-.q \\'=ti:;tj" ri:?77i \ \q1,:;,:r;'}ui/ % \K;;r-lii \. -R \.-& E, ^I 4r,, q$ i..t:ryt'9 s 6 \-* ?ffi 60 a\-a<\s sr which is a polnt on the SoutheasE.erly line of Gore Drive; \g^ --e. thence S 48oOO'00" E L30.74 feet al.ong the Sourhrvesterly line Yo R rrf rizf Tnt 14. t-l.ranra N A'l o17l'l Srt F 71,6!t Foot to , no{nl' on a \ B) which is a polnt on the SoutheasE.erly line of Gore Drive; 'lg^E \ A thence S 48oOO'00" E L30.74 feet a].ong the SouthrvesEerly line Yo -g. \ /of said Lot L6 I thence N 41o17115" E ?5,64 feet to a point on a \\ -+- X 124.74 foot radius curve which is on the Southwesterly llne of \ / \ Streamstde Cl-rcle; thence 28.80 feet alogrg salcl Southwesterly llne ot \ /the arc of said curve to the rlght whose central angle is 13"13t35" and whose long chord bears N 47o05r47" I{ 28.73 feet to a point of tangent; thence conLinuing along said Southwesterly line N 40o29t00" $r 108.37 feet tc the Northwesterly corner of said Lot 16; chence S 37o58'00'r !,90.49 feet lry *,--W:A?E oe.,. 4n/ t?; t2zg c l./er1ores rfee/ r/n F o?. - \ z \'. /:;;;.r,-;;37 ,'{;k LEGAL pEScRrPrroN: %X -.')V $/oil LEGAL uuscKrtsrloN: '.--s;\ -=:_\{ ^S\/^0 A portlon of Lot 16, BrcltoRN StBDIvrSroN -o\ -''* \ 'v'/-'v FoURTI{ ADDITION, Eagle County, Colorado, described as: \ - -^\ n$/n\ Ra.'innino rr- tlra rn.r<t IJocFat"l tr |-nr-narr n€ eaid I nt 16 \ S\ \ /$ffi:l"i:'"1"i:: H":#3;:l*1.::ril ii":':l l3l.'3,,,", \.==g\ /{ *:i.i-i;{ .1-(t! /.t ,#;*t \/^\E" Pr L2T/6 PotrX\&grnnUg xr*r'7ffi?'ff \=*\-Rx x 9-\ t ttf {lllt,A tZ9/orq )odFrbt .J//II;A along said Southeasterly llne of Gore Drive to the polnt of beginninS, cont:r-nittt \ o o t-tc 52a- COMMITMENT TO INSURE This commitment was produced and issued through the office of LANDTITLE GIJARANTEE COMPANY 108 South Frontage Road P.O. Box 357 Vail, CO 81658 (3031 476-2251 Representing: Jrrr-e lrusunnruce flonenr.rv or [flrrvruESorA AlEIAIJAS vi 0sr N N I i,AJ r*,,,r*vu tunt r)NVdnsNl -n:"rl ',{roleu8rs pazuoqlne raqlo ro racr_;3o Suueptlea e fq pau8rs.ralunoJ ueq,tr plp^ aq ol'V aFpaqJs ur u..r\oqs alep eql uo sraJUJo pazuoqlne ,{1np s1r ,{q paxg3e otuneraq eq ol IEas pu? oueu alerod.loc str posneo sEq Blosouur4 Jo ,{ueduro3 ecu?lnsul el}ll 'COAUAHA{ SS3NIIII NI 'luourlmtruoJ srqt fq pero,roc uoa.reql e?e8pou lo lsorelur lo elelse aql enp^ roJ prorar 3o sertnb:e parnsut pasodord oql alep aql o1 rorrd lnq Joaroq al?p a^rlJoJJa aql ol luanbasqns Surq:erle ,lo sproJer :t1qnd eqt ut Sutreadde ls:u 'palearo ',{ue;t 's.retreut iorflo ro srxrEIJ asre^pe 'saJuer qtun rua.'suor[-'sl]{ aO 'spro33r Jrlqno aql Aq u^\oqs lou prru,,nBI ,4q pesoduu 'paqsrurnJ raU?aroq ro aroJoleraqi Jeuat?ru ro roqel 'seJl^Jas roJ 'uarl e ol tq8u ro 'uet1 ,{uy 'sprocer rrlqnd aqt ,(q u,nogs lou eJB qJrq^r pu? esolJsrp plnorrr sasrruard aql jo uorlcadsur pue,{o,r:ns }rallor e r{Jq^\ st]eJ ,4ue pue 'sluauqf,Borcuo '?orB ur aEel;oqs 'saulf ,{Jepunoq ur slcruuoJ 'sercueda.Ilsrq 'sprocar c11qnd aql fq uaroqs lou 'sluoruosBo Jo surep ro 'sluoruasea 'sprocar c11qnd aq] Aq umoqs lou uotssessod ul senred Jo sturelS io srq8ry 'or porroJor aroqe a'uroro3 ruorJ suorsnlcxa pue suorlulndrs pup suorrpuoc rtlt""tl:'*tr'1l:li:ilhTltr':i'"t#ttfi#"r? t*t 5t\o ttd llx :i o uvo N\1-Ls 'luerullluuroJ sJql;o suorsnord aql ol lrofqns ers pue uo pesBq oq lsnu luaulllururo3 sltll {q para,roc uoe:aq1 etetlrour aql Jo sn}?ls aql ro lseralur ro al?lse eql ol sllll eql Jo sntels aql Jo }no tuls!:e ,(ueduro3 aq1 1su1e8e Sqrq i(eur ro a,req ,{eur parnsul pasodo:d aql leq} uollJ? Jo s1q€1.r ro suorlcs Jo uorlce {uy 'n 'uraraq pelJIpour ,{lssardxa se ldacxe tuaulltlrtrlo3 stql Jo ucd e op?tu pup acuelaJar ,tq pete.rodrocul ,{qereq are qcn{A\ parnsul pasodord eqt Jo rolq ur loJ pallnu -uroc satcllod ro ,{c11od;o urloJ otp Jo eSereao3 ruorg suolsnlJxo eql pus suorlelndtl5 pue suollrpuoJ aql pu? suorsr^ord Surnsur eql ol tcefqns sr [1gpqeJ1 qcns puu roJ petlluluoc sarcrlod ro frrlod aq] roJ V elnpaqcs u palE]s lunour? eql peacxa Ilqlquq qcns II?LIS luo^a oU UI'lueulrru(uo3 stql ,(q psra or uoeJarll a8e8lrou ro isojslul .ro etulse aql aleejc ;o el|nbcu ol (J) ro 'g olnpaqcs ul u,uoqs suondacxe olEulurlo o1 (q) ro;oa.Iaq sluaurerynbe: or{t qll^\ Ildu-roc o1 (e) qtFJ pooE ur Suqelrepun ur uooraq ecuBJI -el uI perlncu ssol I?nlJP ro3 ,{1uo puB roJ pe ltutuoc satcllod ro ,{rqod Jo ruroJ aql ur pernsul Jo uor}ruuop eql rapun pepnlc -ul saqred qcns puB parnsul pesodord paureu aql ot,(Juo oq [?qs tuaullurruoJ sJql rapun ,tuedruo3 aqt 3o Ilqrqerl '€ 'suotlepdng puB suorlrpuoJ osoql Jo € qdur8ured o1 luensrnd porlnJur .,{lsnor,lord ,{llflqell uro.IJ ,{ueduro3 arll o^ellor iou lFtls ]uaupueuB qJns lnq 'fJ3qproccz lueuuunuoJ slr{l Jo g elnperlrs puaue ,(eur uottdo sll lu ,{uudruo3 aqt'Jallclu reqto Jo urelJ esra p? 'aouerqrunJue 'ue{ 'loaJap qcns fue 3o e8pa1,trou1 1enloe sarrnbce esun -raqlo ,(ueduro3 ar{l JI ro',{uedujo3 aql o1 aEpel,nonl qtns esol3srp lpqs parnsul pasodo.rd aql 31 'aSpalmoul qrns asolcsrp os ol pernsul pasodo.rd aq1 3o arn;1eg lq pecrpnfard sr ,{ueduro3 oq} luelxo eql ol uooloq ecue[ar Jo 1ce {ue u.rorg 8ur11nsar aEeurep ro ssol fuz ro.; XltpqeJi uor3 poAe[ar eq geqs.{ueduro3 oql'Eunt.r,tr ur,{ueduro3 aql ot aEpel,noul r{Jns asolJslp o} pEJ [[ErJs pup 'JoaJaq g eFpaI{tS uI uaoqs esor{l uuql rerllo }uaullunuo3 slqt ,(q pare oc uoaieql e8uSlroru ro }sora}u ro olBlse oql Surtra;ge rallBru reqlo ro ruclJ esaApE'acuerquntua 'uell '1ca3ap fuu 3o aEpalnou:1 pnlce sa.rrnbce ro suq pomsut pesodord aql gl 'Z 'luoturulsq {}uncos rorl}o Jo 'poep lsrul 'tsnrl Jo paop opnlcur lleqs 'rnelar{ pesn ueq/t\ '..eieEl:our,, urrel eqJ 'l sNo[vt ndu.s cNY sh]oi.L rcN03 ',{ueduro3 ot8 Jo llneJ eql lou sl setcpod ro Xcrrod r{cns anssr ol eJnlrzJ eq} }pql pept,rord 'sJnJco tsnJ roloqrJq r'onssr lleqs roJ pallttuutoc sercgod ro.{rJ1od aqt ueq^r ro Joeroq alep e^rlooJJo oql relJe sr{}uotu xls a}Eunural puE es?ac IFqs rapuneroq suorl -etqqo pue ,{11[qeq [B pue acuBlnsrn opll Jo sarJllod :o fcnod qJns Jo af,uenssr aql o] freunurlard sr tueulnuluoJ srql 'lueuasaropue luanbesqns ,{q .ro luaullqruoC slqt Jo acusnssl eqt Jo aurl egl lE raqile ',iueduo3 aql Iq Jooraq V elnpeqcs u! pouosur usaq o sq roJ pepnuuor sarcllod to ,{cy1od aqr;o lunoue eql pue peJnsul pasodord aqt.;o ,{yluapr aql ueq \ Ipo e,rr1caL;e aq IIEqs lueurlrurruoJ srql 'goaraq suorlelndlls pup suonrpuoJ aql ot pue g puE V salnpeqts 3o suotsnord aql ol lcafqns e :roJarer{l se8reqc pue srunpue.rd eqi ;o 1ueur,{ed uodn 'V slnpaqrs ul ol peJJaJal ro paqllJsap puEI arll ut ,{qeroq peraloc lsarelw ro otplso aql go eeEeSl.rou: Jo rour'Ao ss 'V olnpeqcs ur psueu pernsul pasodord aql Jo ro^BJ uI 'V elnpaqrs ul peupuapr sB 'ecuernsur ai1l Jo sar.llod ro fcgod str anssr ol stunuoJ fqaraq 'uorleraprsuoc olq?n[E^ e ro;'i(wdruo3 aql pellEc urareq 'uorlerodror ?losauwl4l ? 'vJosgNNII4l go ANvdl^loJ acNwnsNl iIlIII slosauull l 'sllodeauulw lo ^ueduioC lools E v.l-osrNNr|uru c0 ANVd*ut soruvdnsrul '17 't ,t .I =1r!l '^eu 0461 - INf lrJlthilloc Notlvtcossv 3'lltr oNV'l Nvctu3Wv Sllz zg9z ruroJ t t_L tl L_. 'i A i,.: i-i ,,j l"l j l i't E i.l l" Ar,,el j.,::a i i r-,r', ttr-," i,Jt::lrj:? F: '::, r. J. ri ir ,:. !- t-] ' ,!i. t :i !-' rr i . i !-, | ,. .- i l-:i:! l- ':l i:'r E -- r:.iUr'rir. i:,,r i i.,- ,. -- - l' r'..i I i:'11- - - l^j i {: l'r r'':,rrr. !- *tTr:i rt;;.!-r (.e ts, l+rig{: r.! 1:er t':, V'rl':j1ri::;:-i " '1 " !.r. 1: i:i,::: ll..,,r: l.i'1 l:,-,:: '.lrtir' 1.4" i.'.:ri:lii:. ;:t t i:j i: i.,,i-) i:i., i'i,. :i:" i:',:I j. ': r' t,::' t',: :i.;st.Je!:! r i..r.t-r rl Fr.-, 1.l':,g.1:.j !n:-:r.lt--+,1 t "t-:i.lA" i.ilrl rr ii,- l'' ; i:',-, li. r:: .,' i:,;,]-.nr F.- j.':,r'.i i.j t i|.\tTrL: n 'l i'.r.,l J.i_)* j. /i-7i:i) l:'r. ,--, F'l !i.:i il .i. n I !!r ." {::! I i,.r '1.1..-l- i. i+l'i Lt, i.ii:.hll,: r:.i-.i''!Ai\l a r' d H,ii iLri-iiiA li.. lrl;:,:.1'!;..$ ! ..f'liil,l l:i, ih rr.f i:inl:e t.* ,ir' i. rr l+r'rir:;t i.i-r '[!-;* i':::.r J !J:i5t:: r':i i 3a:l ':r- ri!tr.:r r',,1ai i:4, j. I' t'fr i. r.r t.-.irnrrri tnrt rrt il.ft,:l {'tV,':l-,t':l l-rrii.:,i. r-! i.s* i'r l:: e.: r: q. -i r.t- I r"". tl, 1; irr,: €stB.hi:' ':'f i. !-r'Lqr'est ,:,:iii,r.,:,:J h*r.* i.rr :.t *.t tfrc ..i.; J:: :: ':-- Li.vl: ,l;l |* f iir..j"-':,.; V..'..E+-i. 'l j, t-j : l"-j L.".1...I Aii n. ftI l'ltlL l. li*ii ;L rlj Llf:ill[i4f;lli F.i. . tjl::i.'Ji, [.i. l'i''tti] i:; " l i-r-s Ii!r':l t,.:,f ,:.j !- r'.."r 'J i:,:, i.rr l': l-r :i.s i. ,:'rr:rr,i. ttirt:nt :i.g ,J!.,,- li, ': r j. t, r.": d c.t f ,:, l 1 r,r,rs l f::F.'L.|F:l..i'-'!i\||.'J|:r|'..|'1Tl-ti:''}']|.-ii,-ll.li::1ii! t_:l..iLjl'j-i't L-il: i:. i;ii-ii. i: . t..l'l.i.li.']ii.:!i|:1{,}:l::il^{-1-i|\]!.1.:'::r'.l1:l:l'j.:::,:i.']j:1'[:]i.Fi i'.'i'!!L:i-|j:::'::;.riiiit''t.l.|.i:.i:,i.i,|'Ji:':-|'i|..]|:'i.J.']i:{.i.,l.'j.4ij.!!::t-;:i:i|j[j:i1..I|1'ij..|L.| l:;i:]l.':i..|i!i|,:::i|:'.!\'::;.i7''':.:"{i:l:i'Fi::'i:,..i. t*.i..ll:i\,ril f.jr-1 .i i:1-.i 1:; i:,i.,i r r.ir: ,r'r:r:ii..! ! j itjlr.i:; f fii:i1....Y !....1!\iE 1..if: ,.:; l'!i!:iii'llj.l .i:!f: |.:-]'!-.l,':{-f:'l.,i.:j.:,t'.il-.i::::i:::,'l:ijFri::f:.iAl..|J|.]i'.:i,:;:1i'i.j'i i::,i:ii-. t-iir ::,.r'i'l-i j- !.li;i!-'!-:. fili 1liL: Fl i i:ji..i-i i,.!l iilt::i:: t-.:l:i'.! lti+L ili.ji.rl_F: i,.: 1ji J.'ll::'|r:|;ij]:.i:::l:j],:.'l|'l]'l'Ji''i.iL::ri::i|:.i::il::J:':|,.,l'.!t',t:;.;p'i;.-;J1 + 7 i..rt:r'i.ritI I: i:j i:,i:i !.i i i.ji-i-l iir.5 47 t:rifjr"'r-ii,llr.; i..JLtiT :,::r " .i.i !:r*.ii ]' T t..' A Frr-r i i'rT ilr;.: j_ l':1i...'r-:. .t. l.l l-- ! C r... U f'l I'l .1. I l'l E:. lt I ',:;l:i Il:r. l Ii..ii....i: A diFF ii,:i.t i,r.rr l\i,:,. l.i':.!::l:: :::ri ,il.i] rti:.r:j'f{i: ir !:. ;1,,., i.i 1' i,;i i-i i.:.:tr; iiij :::.':i !ii!ii,;; Lj[::::, r J.! iF!"::i7 !:'[:i:].-i ft:! iHl: . !!i:i!n,"fHtJi:r;-ii:-r1r_'; t..'r..ll-ii,il,i:i i:r!: :::/.li1. I| [.-i_i-l- ]. l,: T!11:l\j,_;E:::r-ii._l-l-].1 7 Lt!::t:ii;iEE:!i 5lj |!|i'['J|...il.i::.::::ii.ii-1:.-:ii:i-.ii|ji.ij:lj|:]::l:;], l- i. !,i_i:i L.rl !:il-iR i::: [:'F.i.i. vi.:. 1ir I f{l: t:i i t il i r'-ri]: rli r_r; L i\ll'..| i i!l-i " rii 1.. ! A i... I.r i'i !'.i I -i l'l E hi l' r:::,-.i-if !..1i..1i., i:. i..t- 11. t !:;;;qr.1 i. r'i,"r':+f! {. !l I 1:':FF:: ! :L i:a. L i. ,:' rr f i,.:', V':.j'jj:i+ l l :: irr: i I rlrr:.t l-:1it ,::1.'-;* tii': r,.1 :l r..t l- !-.i..rlT!'l rr .Lc l- ';, 1,,:, l: i:,lJrF i:1 ,.", r:j trt:l th! .1. " i:.+ ,11".:rr {: trj ,lr- f ':rr' 'l- lre ,,:. ,: ,: ,-, r.: ir I i'i 1- l-i€ er:-r !i l:r:r!- 3 t'r' rit 't r' t Er a. i .r r' s c,t 'f hrr frtil ,:.,:, !-! !i j. ':lr:r i.u. t i ,:rr i: ':' r' fh€ *+t.rttl ,;, I j;11;1;-'1;t t* L'* -1 rr5Ur'+'"1 . ;:: . l:i',--,|},":- i.rrs br'unr+rrt is) ':. r''.: -d f r rrF tiri iiis f ;,,1i.:, i!!- L!-r tcrL.rit t':' L' r:r ingU!-.e,1 l:rl1{; 1r,.3 r::.,.:il !_: rJt':rl ;,rrid rJr.1 |',' i:.:i i':':i ir ,:, r'. pg,;ir;- rJ. 'b': ,*:i tll 'll,'ii::'t.:r...ii.-tl'''j'ii|::|-I':.ir.;i.:,F\|.ii]|:i[::i'.t.|]:i iiIi1..i;11:.1.,;1:;11;::; i ri\j ].!i.ii-. i.!l*il: f.l l il l.::f i'.j"1- ':!:il-{ t:ii::.i..'i:iFii.l i. l.ir..:; l i i::!i:i,, ;i:j :t ii i-_ l r:1 i:: iJ .-i t,l I l' i'i i-:: hl -i :::;l.:'iJ|: lri...ii... ii. i.i .-j i f:.:.,:':+r,t:r. *rr = i fJFFI 1':; t- i,:t-, I',l,:r. lt':1.::l|::tl llfi: prr:r'i i,:: i-' ,:'r' !': !:, 1i.,:i+s L,r !:,e i.51iur+'J $:!. i I r:: ,:'ntn.:i ri ri:.':{+r: L i. ':'rr .:- bt, tfr* f ':l I,:ti.ii rr:r I.rr' i,r?r] a-- tir+ s. a.rii€ E !'i: 4].rP*s4l 'J r:;{:r tr: 1: l-r+ si.^t j -"'ta rlf j.r;,r; r-r i; t l-r g 1-: ,"' ;1 ;";i. 1"' ..'' ; J." ::::t Lqrri.lar.d F: ::'. r t r, +- :i ,:, !-i ti i fil 1-';,r..113i1 li pr j.rr t i;':! irri i: h..: ':,1v*r' FI-rt:r+t,, 'i:.. '! .l::r'::i:' c il r'! rJ .-r..r.il:.rt::r*'Jn i:r fr r--r'f ''-a: t '.1 r..i'e r-! r ir:i'1r1.lr'i i:' 'rfirJ 5Fr+,:- j.:l ,3. j:i .gi + s g Jtl.:: fi t $ rr':t f i?i: '1ef i-t. t:i*d f,i {-r;; Ir',;q t r..i J- iJ-' 5 iii;!:.'.,:':'' -./ " lilr i' r.tt-; f:i!i.'-l .f :l :r:t,.jj 3 r:tf C..i:::.r:II3r..1 .! |S. A.';r.l i t-,: l; :+ j.,l l;lir rl , li-l" 1... i.lrr:ir f ,:'r r.:rrpe.i.il 1!J ir.+.:,ir '.4. rr rl 5p1r;"1- i: ii ii l- '::r ,:' s ' l! 'l- l-:'i'* .:}.Fr|.:iji-[.|l|.:|:,i'.]j|';.iili.:|.i']l::l.ii:: l}ii$iii:r'':i::il(''t':'i.i||'J|-t|tji!''i;,i.i,:::;l.ri'|t.:ij,i:r4iTij.i.'l.l Fil- [:ir't'-:i!:: li'ji: '. l. (1 . f:i.i r:jl il' 1_ii'j]..|i:.i.tljri!T[:ii}!;Fii::l,;!.r;i?5:iir'JLlh!:l']i:i'| i.'.ii.:r:,:: ., Ji.l Ilr:ir'-ilj: 4.:::i AT Firr!..ii::. 4.'::j,;:'., l-'ii:;:|JAT'ii'i|''li':]j'.!'ji;i].i..].i'{\{'i,l':jj,::|']j.,lii:il,i..lL:iI!'i i i'.1 lji:ii:rf,: j. i,:l a:r't ':r'Ai:ilI .1.':,r;::4 , i i,l Fi, li-i;.: .1. i:.t.;j i.:: i F:,11:il::- :j: .i , I:iii:il"!ul;if,l :::l^.11..:l-rii" j:ij; .1.r.-iFi FiJl-li:'lfl.t r.rLrl..r .i rl.r,rl.:" ::;*r",.Lilnii,c.rr-. L L, l.'1 .;.::J :l: li t|,!r:il.::- :;:''::i 1. A-i i::' i1'11._il:. /.i , J.li.L]1::;i.,l.,i.'1]:.iL::'i,rj:;;'!irjri!ELi'i:i.i|'i.i i::.jrl i I l l...F:tr [{!:: !-l- \j t,l, i:ii:,|-L'j1.i:i:,'i::i.'..;''"t,,r't,rr.-r,iijl.,i1.}i:j::''.|i!{:ti'iill] l. ..,:l':) 1 . jl"l;::''i.:]:i.::.'l'il.i''ii:t.rFY"ii!i:'i:j!-iii.'Ii;]i\i:'Y|ri'1i;iji.l,] 'ii.J t'i$r'ij; i-.!;{ !:; " 'l'| ; i-i lil a.r ::::; . r}lf ::; .i frr i'j 'nili i-.1-. i:iE Iti;j-.1::..ii,:.It, 1"ti-;[ !4: ita !l r'-1 1.. T A t.: i-t l,i 1,1 .i i l'1 i::. i..l l- :.t;i:'i if j:!L.l|-l: * *"r ii;:.,:,::*r'ti.,-,rr rr ) AFr=li,:+ti{'n lr!i,. V''.t'.:t!: tt:i .i'j:.;"i1!::'r:I'1i:ti;:f:jLi-.il::;i.t,:ilji::Li Li-ri.:ri'J iri':.:i!:l !-{! .i!.]i.,:. 4I :ji il 1' PiirlF l!.r-r " i:,.j':li:,:'i..ii.'FiL-'i.,ar,.:i!|.ljl-}ii:ij,|.ijji-:i'|,ijti.ii.iIiFiji::i:.i:)iJl- I i..i l,!.rr li: ,lll::i::r ::lr'i" I.A{.jiF: 'ii,:j.!;l . I'fir it- RTcHARDs ENcrnfis, rNc. P. O. Bor 613 Vril, Colondo 8t657 Phom tl76-3071 Drnvrr Linr - 2t[4-1521 [!i{ittii.i{h \ i.#,,r.// J \'t$':::*../ r?\' \ \/' .0Y ^t/-q* zz- \t:';"-/.9 a1* ,Mrg -.:.=- .,...q""\- ot \ €)r p$f\g ,& \ €\ ,< Na 4.R.;s*\i-": \ \o-t; \ \ rr- -\' \\\-.\\-\\ ..tN ^, *^ffi,or 16, BrcHoRN,*,(ffK{t --.-*<v%-Xgii:"y,tfr FOURTH ADDITI0N, Eagle County, Colorado described as: Conmencing at the rlost Westerly Corner of said I€t 16 which is a poln! on the Southeasterly 11ne of Gore Drive; theoce S 48o00t00" E L30.74 feet along the Southvesterly cnence 5 4o-uu'uu .1, IJu. l+ IeeE al'orlg Eue JouEnwesEer.y \ G}\cr line of said Lot 16 to the true point of beginnlng; thence\ -O^\ contlnulng aLong saiil south\resterry 1r"l.l 1::09::0"_:^-^^ \lbl 82.06 feet to the Southeast Corner of said Lot 16; thence N 20o29r00r'E 96.09 feet along the Southeasterly llne of sald Ipt 16 to a polnt on the Southvtesterly line of Streamside Circle;G s thence along said South\resterly Line on the followlng 2 courses: (1) N 69o3Lro0" W 15.50 feet to a point of curve; (2> 34.4L feet along '(S s che arc oE a L24.74 foot radius curve to the rlght whose central angle is 15o48r25r'and whose long chord beard N 61"36r47" w 34.30 feet; thence s 41o17t15tt i{ 75.64 feet to the true point of beglnntng, containing 51416.4 square feet or 4.1243 aeres more or less. CERTIFICATTON; I certlfy that on the above date an inprovemenE survey was nade under my supervlsion of the above descrlbed property and thaE che improvements are accurately shown hereon and thau the above plat an$egra!-,"{e,scrlptlon were prepared by rne and i.:1",1.i.'.-p]..,.#'.;;u't i*'- a*-. :*.7:l" r', -' .. . ".,'o f 'r,,*: u., "j?.1';Y 'h,?i!fr..t*Y'-.zlj r"?{ii'l::;'.'+ 'r\r:'Ur= l';u --r i\ \r r tr--f ;;''Y : -r!\\- ( silw no V3./OA. \ 5i./i1i;? i'r /.Si i ti iv \,re (ae.ku 7$$ t-{i7" i7 c (-i t-, '* (LJ t I O U).>{, ,r'w ffi* W;;]'7,1),1! ililililyI ,-\' AND IAND suRveyoR No. Z/gi. :-. PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Planning and Environmental Commjssion of the Town of Vail will hold a pub)ic hearing in accordance w'i th Sect'i on .18.66.060 of the municipal code of the Town of Vajl on August 25, 1986 at 3:00 P.M. in the counc.i 'l chambers in the Vai1 Mun'i cipal Building. Consideration of: 1. Proposal for a minor subdiyision of Lot Z, pitkin Creek Meadows. Appljcant: Tom and Nick Kiahtipes 2. Request for a front setback variance in order to construct an addjtion on Lot 16, Bighorn Subdivision, Fourth Addition.Applicant: William D. Benkelman 3. A request for an amendment to Special Development Distrjct No. 5 (Simba Run) in order to pay funds in lieu of constructing a tot lot on the property. Applicant: Sjmba Run Associates The appl i cati ons and i nformati on about the proposal s are avai'l ab1 e in the zoning administrator's office during regular offjce hours for publ ic inspection. TOt,lN OF VAIL COMMUNITY DEVELOPMENT DEPARTMENT THOMAS A. BRAUN Zoning Administrator Published in the Vail Trail on August 8, 1986 5Wrtes f *Wf rb,/,q(g,/f -r-'o kt /a $a6wl Jo@rwslo4 4?Z ,@4, e, P,4ef /of /G Pofarzf W, @aMe- #rr 9rca*tspe cRcce V4rc r co 8lo;7 /"r /t ? f*rercy< / %g #, Cfu,toirhh /oo e. s/@,f , S4tte zlo a /r 't SW [4ti,<ec , Q ?4?o/ 'i:"^'il.u, tlLb y(tuern .+ I kuu,v c. ksr<Ar,+{\/a, &x d 8,7 /A Qtsu.ta ( &+ izzgz bt /6 o o r&v. (, .hltion-rra T,fAS4(Ats #qa E,/AtuM wJv€ W4/L r @. 8/Gs7 /ar lq VareAf k{ QcDe(1 4gZE Sps,yasrDe qWE Wtt-l b &as7 U o a${e,s af @"owzz7 &Aca<rr 7-z kt lG WeN suptwsp</ 14r..W, 7T,nfm F,Us 8/q G 4SoS /ftfutr/ D@re Trufue. tru./s Cq<futr4nn AE%/4T"oq 4474 /ftfu6/ VP/(e vtrc / a 8tos7 o APPLICATI0N oerc: lt4t, b t /4F- DATE 0F DRB I4EETING'W L' DRB APPLICATION *****THJS APPLICATION t'ILL NOT BE ACCEPTED UNTIL ALL INFORMATION IS SUBI4ITTED***** I. PRE-APPLICATION MEETING: A pre-app'l ication meeting with a planning staff member is strongly suggested to determjne if any additional informat'i on is needed. No application will be accepted unless it is coinplete (must include all items required by the zoning administrator). It is the applicint's responsibility to make an appoinunent with the staff to find out about additional submitta'l requirements. Please note that a COMPLETE applica- tjon will streaml'ine the approval process for your project by decreasing the number of condjtjons of approval that the DRB may stipulate. ALL conditions of approval must be resolved before a building permit is issued. A. PROJECT DESCRIPTION: OF PROPOSAL: Legal Description Lot /a Bl ock Zoning C. NAME OF Address D. NAME OF APPLICANT'S REPRESENTATIV Address E. NAME OF OWNERS: Si gnature B. LOCATION Addres s Addres F. DRB FE VALUATION o - $ 10,000 1o,oo1 - $ 5o,ooo 50,001 - $ 150,000 50,001 - $ 500,000 00,001 - $1,000,000 0ver $1,000,000 IMPORTANT NOTICE REGARDING ALL SUBMISSIONS 'nE e\< -/"a ( ) tl $e o $ 10.00 $ 25.00 $ 50.00 $100 .00 $200.00 $300.00 TO THE DRB: 1. In add'i tion to rneeting submittal requ'i rements, the applicant must stake the s'ite to ind'icate property lines and building corners. Trees that will be removed should also be marked. This work must be completed before the DRB visits the site. ?. The review process for NEI^I BUILDINGS will normally'i nvolve two separate meetings of the Design Review Board, so plan on at least two meetings for the'i r approva). 3. People who fajl to appear before the Design Review Board at their scheduied meeting and who have not asked for a postponement will be requ'i red to be republ'i shed. r,l:^s.Ki7Lpx4y'/,r '43 -/zoo tetevhoneQf635127 The fee wi'll be paid the tjme a building permit is requested. FEE 4. The following items no longer have to be presented to the Design Review Board. They, however, have to be presented to the Zoning Administrator for approval: a. |l|indows, skylights and similar exterior changes that do not alter the existing plane of the building; and b. Buiiding additions that are not viewed from any other lot or public space! which have had letters submitted from adjoining property owners approving the addition; and/or approval from the agent for, or manager of a condomin'ium association. 5. You may be required to conduct Natural Hazard Studies on your property. You should check with a Town Planner before proceeding. NAME OF PROJECT; LEGAL DESCRIPTION: STREET ADDRESS: DESCRIPTION OF P The fo'l I owi ng i n Board before a f A. BUILDING MAT formation is 'i nal approval ERIALS: TYPE OF MATERI LIST OF MATERIALS required for submjttal by the app'licant to the Design Review can be fiven: COLOR o Roof Si d'ing Other l,r|all Materials Fasci a Soffi ts !Ji ndows hlindow Trim Doors Door Trim Hand or Deck Rails Fl ues Fl ash'ings Chimneys Trash Enclosures Greenhouses 0ther LANDSCAPING: Name of Des'i gner: phone: R PLANT IIIATERIALS: Botanical Name Common Name Quani ty 2 Si ze* pRgpgsED 7sp7{PaQur6,<s €t** &re *rrre 1k/o,- lz' EXISTING TREES TO BE REMOVED for conifers. (over) *Indicate caliper for deciducious trees.Indicate height o o o 75 south frontage road Yail, colorado 81657 (303) 476-7000 offlce of communlty developmenl July 21-, 1-987 Mr. Peter Looms 4267 Nlrgget Lane Vail, Colorado 81657 Re: ;fensen carage, Lot 16, Bighorn 4th Addition Dear Peter: At the Design Review Board neeting on JuIy L5, approval was given for the garage addition with the stipulation that the roof overhang on the east side extend at least six inches beyond the building. Peter, I apologize for the oversight on ny part and the delay it caused you ind your client. r real1y lplreciate your cooperation. Si,ncerely, lzt I .R9 rn9 &./t ESY ann Be P1 so1 Te ack chnician o Project Application Date Name:Projecl Proiect Contact Description: Person and Phone Owner,Address Address and Phone: - Legal Description: Lol Block Filingr Comments: Design Review Board Date Motion by: Seconded oy: APPROVAL DISAPPROVAL Su m mary: Date: Town Planner EI Statt Approval LIST O MATERIALS .NAME OF PROJECT: LEGAL DESCRIPTION: STREET AODRESS: DESCRIPTION OF The following information is required for submittal by the applicant to the Design Revievl Board before a final approval can be fiven: A. BUILDING MATERIALS: TYPE OF MATERIAL COLOR Roof Siding Other t,lall Materials 6 Fasci a Soffi ts I.'l'i ndows l,lindow Trim Doors Door Trim Hand or Deck Rails Fl ues Fl ash i ngs Chimneys Trash Enclosures Greenhouses 0ther B. LANDSCAPING: Name of Des'igner: Phone: Botani'cal Name Common Name Quani ty Si ze*PLANT MATERIALS: PROPOSED TREES EXISTING TREES TO BE REMOVED for conffers. ( over ) *Indicate caliper for deciducious trees.Indicate height PLANT MATERIALS: (con't) SHRUBS EXISTING SHRUBS TO BE REMOVED GROUND COVERS .-.v Botanical Name Type Cornmon Name Quani ty Si ze Square Footage s0D SEED TYPE OF IRRIGATION TYPE OR METHOD OF EROSION CONTROL C. oTHER LANDSCAPE FEATURES (retaining wal1s, fences, swimming pools, etc.) Please specify. u\ r(UJ LL I:J. ,, ,. ]IITEP,.DEPARTHENTAL REV] El^l DATE Date DATI sUsl4lTTED: 6 I zt -f- CCI".I4ENTS NEEDED BY: ' BRIEF OESCRIPTION OF THE PROPOSAL: t F PUBLIC HEARING 7 / / /)P ( //(\r 1\-__. FI RE DEPA,RTI'IENT Reviewed by: Conments: Da te Ccnnen is: POL]CE DEPARTI4ENT Rev i ei,red by: Connents: Reviewed by: Co;:"ents: RiC N iAT i OI.I DEPARTi,tENT Date Da te \. R0BERT l"l. RUDER d. The land cefrrncd to in thia conrmitment is delcribGd er fol I orrlgr .AIPORTION OF LOT 16, BIGHORN SUFBIVISION FOURTH ADDITION,couNTY oF EAGLE' srATE oF coLoRADcr, DESCRIBED A$ FoLLotJ$! CCIFII'IENCING AT THE I"IOST hIESTERLY CORNER OF SAID Uf,T 16 I.IHICH IS A POINT ON THE SOUTHEASTERLY LINE OF GCIRE EIRIVEi THENCE S 48 trEGREES CIO I'IINUTES OD SECONBS E LgO.74 FEET ALONG THE SOUTHWESTERLY LINE OF SAID LOT 16 TO THE TRUE POINT OF BEGINNING; THENCE C0NTINUING ALEIN$ SAID soUTHwEsTERLY LINE s 48 DEGREES OO HINUTES C,O SEEflNTI$ E S2. 06 FEET TO THE SOUTHEAST CORNER OF SAID LST 16t THENCE N 20 TIEGREE$ 29 FIINUTES CIO PAGE 1 ALTA COI'I 1'IITFI ENT SCHEDULE A Appl icetion No. . V1051A SECONDS E 96,09 FEET ALONE THE SCTUTHEASTERLY LINE OF SAID LOT 16 TO A POINT ON THE SOUTHI"IE$TERLY LINE OF STREAI'ISIDE CIRCLEi THENCE ALONG SAID SOUTHI^IESTERLY LINE ON THE FOLLOWINO COURSES: . .. 1) N 69 DEGREES gl I'IINUTEd c,O SECuNDS W 15.50 FEET TO A POINT OF CURVEI ?, 34.41 FEET ALONG THE ARC OF A T24.74 FOOT RAEIU$ CURVE TO THE RIGHT WHCISE CENTRAL ANGLE Ig 15 DEGREES 4S ]{INUTES 25 SECONDS ANII WHOSE LONG CHORD BEARC N 6I DEGREES 36 I'IINUTES 47 SECONDS I.J 34.30 FEET' THENCE S 41 DEGREES 17 FIINUTES 15 SECONES l.f 75.64 FEET TO THE TRUE POINT OF BEGINNING. o ALTA COFIf'l ITI,IENT SCHEDULE B-2 (Excertions) Apelication Nq. V105l8 The policv or policies to be issued u,ill contain cxc€Ftiqng to thc follooine unlese the sane gre dieposed af to the ratirfection of th€ ComP.nY! 1. Standand Exceptions 1 throush 5 pninted on the coven sheet. 6. Taxes and a.ssessments not yet due or pavable and special eFse5sments not yet centified to the Treasuner.'s office. 7. Anv urrpaid taxes oF ass€ssments aeainst said lend. B. Liens fon unpeid uater and seuen ch*ngesr if any. 9. RIGHT OF PRCIPRIETOR OF A VEIN OR LODE TO EXTRACT ANE REI"IOVE HIS ORE THEREFROI'I SHOULD THE SAI.,IE BE FOUNE TO PENETRATE OR INTERSECT THE PREMISES AS RE9ERVED IN UNITE! STATE$ PATENT RECOREED Novemben 17' l9O2' IN BOOK 48 AT PAGE 492. 10. 11. RIGHT OF IilAY FOR DITCHES CIR CANALS UNITED STATES AS RESERVED IN UNITETI '9Q2, IN BOOK 48 AT PATiE 432. CL1NSTRUCTEB BY THE AUTHORITY OF THE STATES PATENT RECORBED November l7' 12. RESTRICTIVE COVENANTS, ],{HICH trO NOT CONTAIN A FORFEITURE OR REVERTER CLAUSE, BUT OI.IITTING RESTRICTIONS, IF ANY, BASED ON RACE, COLOR, RELIGISN, DR NATIONAL ORIGIN, AS EONTAINED IN INSTRUI'IENT FECOREEE Becemben 20' L962, IN BCIOK r74 AT FAGE 4Og ANE AB AMENFEIT IN INSTRUMENT REEORDED Febnuarv 06r 1964, IN BEOK 1g? AT FAGE 3I PEDESTRIAN, DRAINAGE ANF UTILITY EASEI.IENT TI,IENTY FEET IN WIDTH ALCING THE SOUTHT.TESTERLY LOT LINE OF SUBJECT PROPERTY AS SHOhIN ON THE RECORDED PLAT OF EIGHORN SUBTIIVISION FOURTH ADDITION. TERI-1$' CONDITIONS AND FRCTVISICINS CrF PARTY lllALL AGREEHENT RECORDED $ertemt,er 11' 1973 IN EOOK 23T AT PAGE 4. 13. ftucJt'r-K-e.lt .\I \ ''@nstruction@npory July 28, 1986 Tcni'm of Vail DeparhEnt of Ccruunity Developoort Vail, CO 81657 Re: Bsikelgtan - Prooosed Additiqr Precise nature of Variance reguested: Errcrcactmerrt c'n (into) required frcrrt set back space. (6' to 9') for off-street parking (garage), P.elief frcrn the reguired front set back regtrlaticrr is necessaq/ to pernrit location of ttre proposed additicrn Eo nininr-ize irpact on strepm (Gore Creek) frcntage. Ihe groposed additicrr will have no ad',rerse effect on quality of liglrt and air; it will have no effect cn population distritnrtion, pr:blic transportaticrr, or utilities. The qroposed addition will trave a positive effect on traffic facilities arrd p.rblic safety in that it is providirrg sE)arate, off-street, cm-site oarkiag facilities for tr^ro cars. President 4496 East Meadow Drive Vail, Colorado 81657 (303) 476-5708 Project Application ,^r" r4ffi, /4, /?4 Contact Person and Phone , Address and Phone: Legat Descripti on,Yo1 /6 , aw"x ,r,n@,zonfrWX Comments: Architect. Address and Phone: Design Review Board Date Motion by: Seconded by: APPROVAL DISAPPROVAL Summary: Datei Town Planner D statt Approval o o o / PLANNING AND ENVIRONMENTAL COMMISSION September 8, I986 0iana 0onovan Bryan Hobbs Pam Hopkins Duane Piper Sid Schultz Jin Viele ABSENT FE[lfosterfoss Before the neeting, the board visited the Benkelman and Drisko sites. The meeting was called to order by Ouane piper, chairman, at l. Approval of minutes of August 25, 1986. Jim Viele moved seconded to approve the minutes. The vote was 6-0 in favor. STAFF PRESENT ffin- Tom Eraun Rick Pylman Betsy Roso'l ack 3:00 PM. and Diana Donovan 2.Re uest for a fro t setback ce tn r to construct addi ti on Lot L rn 4t Rick Pylman explained the request.said that origina'l 1y the proposal would 3.eque st for front in order to construct a sEo r rst have requ'i red a setback variance from a stream, but ihe proposal'wai ctranlea and moved away from the stream setback. The staff recommended approval oi the setback variance due to_the configuration of the lot. peter Looms, architect for the addition, explained that no trees were being removed and that the second f'loor only intruded slight)y into the front setback. Donovan asked why the addition was not coRnected more strongly to the house and was told that there were windows which interfered. She felt strongly that the addition could have been designed within the setbacks. Tom-Braun presented the proposai and showed a site plan. The garage encroached 10 feet jnto the required 20 foot front setback, and 9 feet jnlo tie required 15 foot side setback. Braun felt that ex'i sting vegetat'i on between this lot and the neighbor would offset any potential impacts from the construction.Further, historically, the staff has been very supportive of var.i ance requests for garage additions. He mentioned that there was still needed a title report and a sign off by the utility companies concern'i ng the 10 foot utility easement. Braun stated that the staff recommended approval and that two conditions of approvai were the s'i gn-off of the utility companies and that the smaller of two pine trees was to be saved if possible PRESENT cant: }'li Viele Hobbs addi ti on vote was 5 in favor with Dianffi side setback vai Bob Benedict, representing the owners, stated that he had arranged a meeting on the site with a local nursery to see what trees could be saved iithout aamiiing the roots. Hobbs moved "nd Hookil. sp.olded to lpq g/g6. Th" uot. r"" g-0 jn f.uo.. *djs!=o! thg Yaii.Poti!e ?tjpartm at 75 South Frontage Road. Appl i cq!!: Town of Vai I Tom Braun explained that the Police Department needed the radjo antenna in order to function properly. curt Ufkes, chief of police, stated that the Police Departnent had not installed the antenna, but were anxious to do so.Diana Donovan suggested the antenna be painted to match the building (to be suggested to the DRB). She stated that she would not approve the antenna for a residence, but since this was for public safety reasons, she would approve the reouest. 5. Request lo_apply Grgenbelt. ihd_Natural open Soace zonjlglg3a_ry,ggg31 sides by Breakaway West Condominiums. App'l i cant: Town of Vai I Peter Patten exp'l ained that there had been a change in process. The Town would remove their proposal to zone the property, and the owner w.i ll request to receive zoning and a mjnor subd'ivjsion. The applicant planned to request Parking zoning and have a parking lot for 10-11 cars. Viele moved and Hobbs se onded to rove the en the staff nemo dated 9/8/86- The vote was in favor. - It was announced that there wou'l d be a joint meeting with the Town Council on september 30 concerning the vail vjllage Master plan. The rev.iew of the Land Use Plan is scheduled for September 22. Diana Donovan asked if the pEC could receive copies of the Land use Plan by the Friday before the meeting, and was told copies would be delivered then, unless changes were nade at a meeting on the l8th Duane Piper reported that at the last DRB meeting, the DRB denied a design for unconnected primarylsecondary units. Thjs was to be appealed at the council meeting on September 16, with a possible change to the ordinance. The DRB is aski ng the Counci I for gui del i nes. pec 9/8/86 -2- o o fuder-Rein$fi$*o*pony Jfly 28, L986 Tor^rrr of Vail Departsert' of Cccm:nity Developmert Vail, C0 8L657 Re: Ber*el:man - Prooosed Additic'n Precise naErre of Variance requesLed: Encroachsrt crr (into) required frsnt set back spa.ce. (6' to 9') for off-street parking (garage). Eelief frcm the required f::ont set back regulaticn is necessarl to peimrit locsticn of the pr^oposed addition to ninjmize iryact on stream (Gore Cteek) fr-crrtage. Ttre proposed addition rrill banre no adrrerse effect on quality of ligfrt ad air; it will have no effect on population distritnrtion, public trtrEportaticrr, or utilities. The proposed additicrn r,rill trave a positive effect cn traffic facilities and pr:blic safery in Ehat it is provid:ing sepErrate, off-street, on-site parkiag facilities for trc cars. o President 4496 East Meadow Drive Vail, Colorado 81657 (303) 476-5708 {'r),,' Appl ication PEC MEETING o ate July 28, 1986 DATE Arrgust 25, L986 I. APPLICATION FOR A VARIANCE This procedure is required fgl gn{ project requesting a variance. The application will not be accepted unti'l all inioi^maiion is'submitied. A. NAME 0F APPLICANT Williatn D. Benl<eturEr ADDRESS Box 7035 Ttoy, Mich 48007-7035 PHoNlu-s83-1200 B. NAME OF APPLICANT'S REPRESENTATIVE ADDRESS M96 Fasx t"leidow lrive Vai1. Colorado PHONE 476-57M c.NAIVIE OF oI^JNER(S) (or print) Si qna ADDRESS Sae as above llillian D. Berikelnan PHONE D. LOCATION OF PROPOSAL ADDRESS 454.2 Streanside Circle, VaiL, C0 LEGAL DESCRIPTION LOT 16 BLOCK t{A FI LI NG E.FEE $100 PAID Bighorn 4th COMMUNITY DEVELOPMENT DEPARTMENT l.llLL ACCEPT THE FEE MUST BE PAID'dEFOR'E THE YOUR PROPOSAL. F. A list of the names of owners of all property INCLUDING PROPERTY BEHIND AND ACROSS STRTETS:THE APPLICANT HILL BE RESPON5IBLE FOR COINTCi adjacent to the subject property and their mailinq addresses. I'IAILiNG ADDRESSES. II. A PRE-APPLICATION CONFERENCE WITH A..PLANNING STAFF MEMBER IS STRONGLY SUGGESTED TO )DETERMINE iF ANY'ADDITI0NAL INF0RI'l,Aii0N-1s lriiblo.''h'o npplicnTroN t.trLl BE AccEprED UNLESS rr_rs^coMpLFiF (MUII. rNCfurjE iiii-iiiu!. REquTRED By rHE zoNrNG $gllNlsIRAIgE).- Ir Is rHE APPLicANT'a nEiFoN'sieriiiv-ro MAKE AN ApporNTMENr l,|ITH THE S.TAFF TO FIND OUT ABOUT ADDITTONNL-sUSMiiiNi NCqUTNEMENTS. ibiilidiis'lilld:ffiffiff:ilitii:i'llbh,;115ft!';l'JfFoili-?xii l[P'Fil-[?h AND ENVIR0NMENTAL COMMISSION r'tnV sitpulnTi: Ai-goniilots oF AppRovAL MUsr BE C0MPLIED l.lirH BEFORE A BUTLDTNG pEm'rri-ii-issuED.'. ":^ , i , ; III. FOUR (4) COPIES OF THE FOLLOI^'ING MUST BE SUBMITTEO: A' A WRITTEN STATEMENT 0F THE PRE!.I!E t'tRrune oF THE VARIANcE REQUE5TED AND THE REGULATI0N INv0LvED. THE STATEMENT MUsr nrso'noonrsi,".-' "-'-- l' The relationship of the requested variance to'other existing or potential . uses and structures in the'vicinity. -- -: 2' The degree to which relief from the strict or literal interpretation and enforcement of a specified reguliiio; i;-;";;ssary to achieve compatibility and uniformitv of treatment atong siies in-i[e viiinitv-6r-io iiiatn lre objectives of this tiile without grant of sjecia.r p"iuir.g".- --. OVER Vari ance 3. The effect'of the variance on light and air, distribution of population, ' transportation, traffic faci'l ities, utilities, and public safety' B. A topographic and/or improvement survey at a scale of at least'l " - 20' stamped by a Colorado licensed surveyor inc'l uding locations of all existing improve- ments, including grades and elevations. 0ther e'l ements which must be shown are parking and loading areas, ingress and egress, landscpped areas and utility and drainage features. C. A site p'l an at a scale of at least l" = 20' showing exist'i ng and proposed buildings. D. A1'l preliminary bujlding e'levations and floor plans sufficient to indicate the iimensions, general appearance, scale and use of all buildings and spaces existing and proposed on the s'i te. E. A pre'l iminary title report to verify.ownership and easements F. If the proposa'l is located in a multi-fam'i1y development which has a homeo*iiers' association, then written approval from the association in support of the proje'ct must be received by a duly authorjzed agent for said associatjon. G. Any additional material necessary for the review of the application as determined by the zoning administrator., * For interior modificationst an improvement survey and site p1 an may be waived by the zoning administrator. IV.Time Requirments- The Planning and Environmenta'l Commjssion meets of each month, A complete application form and (as described above) must be submitted a minimum PEC public hearing. No incomp'lete appiications administrator) will be accepted by the planning nated submitta'l date. on the 2nd and 4th Mondays all accompanying material of 4 weeks prior to the date of the (as determined by the zoning staff before or after the desig- -/) t.1 ( .i:L;4-,-<_, L ,/' /'i t'1/ r.^; /1,, .:-k L; '/ ' ,4. t-. 1 {1 /(LL 1,t', lt4,.t ri - | /,'"' ' ,' ,t'u ' ' ''-'-)u- , .i /(t ,',. ltr-.(L,.',- /z /,n 7tz*-xi 1,,/ /) ,. './. ') l 1,{e t^-,- 7 Y---"-. , ,..;.,i,r,t.L. t4_,. ,l ;1r,,' L -l t., c -L t' /4L | ,/ /' t'7(' 7- 1- 'k - ':1yt'"-^-'/' y''' / \,7-1'e' t- /> )-"t 4'^ 4 / /( r.'-f'L , I at / c t,t- / ,L l,__ , ),( t_ /c t t.._-, ./t o w %i+'-L r4ltlt .ylu4.te &oau /|Ut tuL -/h* Q att+ 7||cc /t lt'di /urrr)'- fr4- 3o9 lail u-b,*'ott- /^a//t rte. Z/t+(* (,.,-,'--:' - utdott Barrr*l" ,6 A-tt udan*e/'ltt- *t- &-Lfrn ryhaK -4r4 q ^4tot-, U/o' tl, "t'rtt /ttt1- o J)r. 'l,l \ rie ct^- O uu.LL Lcsr' LL<-,t<t'Lt-.t t-, ..(.-.(-"- .L/Lr=--- rl,'n"-- t -./ l/ -nu-/u *, O. '=31tr ltt'', (L( | |(- PLANNING AND ENVIRONMENTAL August 25, .|986 PRESENT Diana Donovan Bryan Hobbs Pam Hopkins Peggy 0sterfoss Duane Piper Sid Schultz Jim Vie'l e The neeting was cal|ed to order at 3:00 PM by the chairman, Duane Piper. 1. 2. Appointment of PEC member to DRB for September. 0ctober and November. This item was moved to the end of the agenda. 3. Proposal for a mjnor subd'i vision of Lot 2. Pitkin Creek Meadows. App'l icant: Tom and Nick Kiahtjpes Tom Braun showed site p'lans and gave the background of the proposal . He stated that proposed was to subdiv'ide one existing duplex zoned lot into two individual parcels. The existing dup'l ex lot contained a legal duplex structure (Lot 2), and the proposed 1ot (Lot 3) would have the development potential for an additional duplex. Braun stated that two sets of criterja were to be involved in reviewing a request of this nature. The first was the PEC review criteria as outlined in the Subdivision Regulations, the second set addressed issues such as minimum 1ot size, buildable site area, geo'l ogic hazards, access, and utility service. Braun said that the clarification of the easement should be a condit'ion of approval , as well as utility verification by a'l I applicable uti'l ities indicating that service can be provided to the proposed Lot 3 prior to the recording of the subdivision. Tom Allen of Internountain Engineering said that he wou'ld answer questions about the survey. Stan Gil1is, a resident of the unit adjacent to the proposed Lot 3listed several other points to consider. These included the fact that the original request when the subdivision was first planned was for 3 lots, but that the Town saw fjt to grant only 2, the lot was too close to I-70 which resulted in vehicles in accidents'l anding in the area and traffic also made the lot noisy, there was a botanica'l hazard, as there were many dead aspen trees standing on the 1ot, and they had a tendency to fall over, there would be a parking problem, and the value of the existing structures would decrease with the added traffic across them. Jane Bemish, one of four owners of one half of Lot 1, stated an objection to the subdivision until she would have more time to review the access agreement. She also agreed with Gi11is'objection to added traffjc on the property and noise from the Interstate Tom Kiahtipes stated that he would wonk with hjs attorney on the easement agreement. He felt that it was very feasible to add another lot. COMMISSION STAFF PRESENT Peter Patten Tom Braun Kristan Pri tz Eetsy Rosolack Approval of minutes of Jul-y 28. .|986. Diana Donovan moved and Pam Hopkins seconded to approve the minutes. Vote was 6-0-l in favor. Sid Schultz asked why the Town did not allow 3 lots ori ginal 1y, and was told that at the time of the origination of the subdivjsion, the min'imum lot size for duplex lots was 17,500 square feet, but that now it is .l5,000 square feet. The parking situatjon was discussed, and then Diana Donovan asked whether there cou'l d be a condition placed upon the approval that stated that a variance could not be requested upon building on this 1ot- Braun replied that legal 1y, no one could be denied permission to apply for a variance. Jim Viele asked Tom Allen of Intermountain Engineering how the 40% slope had been figured and Allen felt it probably had been measured contour line to contour line which original ly had been measured with a plenemeter Viele felt that the measurement would only be as good as the drafting job, Peggy 0sterfoss asked where on the site the structure would be placed and was told that most likely it would be placed on the lower part. Peggy pointed out that she lived across the creek and that there had jn the past been difficu'l ty wjth unstable soil in that area. Braun said that the property was not in a debris flow area. Peter Patten speculated that setback varjances may have to be given in order to construct the building in a logical location on the lot, and that the PEC could say that they would look very closely at a varjance request. Jane Bemish wondered if the request for Lot 3 could be given if the owners on Lot I withdrew their access agreement. Diana wondered which group of people should address the fact that that section of I-70 was dangerous, and who should be concerned? Braun suggested that in light of the concern over the access agreement, the commissioners may want to table the item. Osterfoss moved and Donovan seconded to table this request untiI the easement agreement was resolved and the safety question was addressed. The vote was 7-0 'i n f avor of tabl i ng. uest for a front setback variance in order to construct u001v l s on. 4th tion. Peter Patten stated that the submittal was inadeouate in that it\did not address the fact that the project would require a variance from a stream setback and the staff was asking to table so that it could be republished with the additional information. Viele moved and Donovan seconded to table unti'l it could be publ ished. The vote 6 Are uest for an amendment to cial Devel o nt District No. 5 Simba Run n order to unds in con stru ct a tot ot on the cant:ates Kristan Pritz explained that the applicant was requesting to amend Special Development District No. 5 (Simba Run), Development Area B) to exclude the requirement that the owners construct a tot lot. They propose jnstead to contri bute $.|0,000 to the Town of Vail Recreationa'l Amenities Fund which would be broken down into three equal payments usjng an interest rate of l0%. The Simba Run project provides recreat'i onal amenities that include 1 indoor swimming pool ,2 racquet ball courts,3 tennis courts, 2 video games and a pool table. The ordinance creating the special development district required that the approved development plan include a minimum of 5 tennis courts, a bike and a, ot add'iti o canE: -2- PEC 8/2s/86 Ylue- IITP/ j ek box 100 vail. colorado 81657 (303) 476-s613 off ice of the town manager June 1, 1977 Mr. Barrett Oliver P,O. Box 1194 Yai-7, Colorado 81657 Dear Mr. Oliver: rt has come to my attention that sign.ifiCind@qFities of fill dirt have been deposited on your 1ot, Lot i@' Bighorn Subdivision, Fourth Addition. f am nott-infor-1n-e1!-y!-edher or not you are ar,vare of this situation. Besides being unsightly, this activity constitutes a danger to the trees and a violation of the Town of Vail's Zoning Ordinance. Please contact me at your earliest convenience to discuss possible remedies to this situation. Sincerely, DEPARTMENT OF DEVELOPMENT /frV7,r-,- )g'/#l{illiam F. Pierde Building Official I DESIGN REVIEW BOARD ACTION DATE OT MEETING: MEMBERS PRESENT: TAKEN BY BOARD; MOTION: VOTE: APPROVED: ABSTENTION: DISAPPROVED: SUlrlltlARY: /^-1/rytuh)loD SECOMED BY: AGAINST:FOR: Ch:rirr:rnu oI tltc lSoitrd a DI|SICN nllvIl,:i'l lloAnD DATI OI' TIDTIDIiRS ., Irr.'rTTNr..r|llJlrl r.rv. PRDSDNT: [rroN TAKI'I{ BY BOAIID: 7,*-(a 7 /u/n ITIOTION: VOTB: SECONDDD BY: AGAINST:FOR: AI.}STIINTION: APPROVIjI): DISAP]TRO\IliD: suiullAIiY:I