HomeMy WebLinkAboutBIGHORN 5TH ADDITION BLOCK 2 LOT 7 LEGAL.pdf69/AL/zaAE L4':,32 3A3-274-8642 DRURY BRBS RODFING PAGE A2/82
Bat ozcb
APPLICATIOT{ WILL 1{OT BE ACGEPTED IF I]{COf,IPLETE OR
Project #:
-03 o7
'*ffi
75 S, Frontage Rd.
Vell, Colorido 81657
F:\odev\FoRj'lS\Pennltr\Bu ding\bdldlngJrennil+Z t -06,DOC
6A
ty
sF:P '' 1 ?n','i
P.g€ I of f5
PLUMBING; $TOTALi$ tt zrrM o
For q.'isit
F,3tEE[#
eoqqrSA6&001
ryTeuLnh \/Job Address: rr -<-l3q (z(e (r,'r.
legatoeecription [Lot 1 lerucr: 2 lritins, f suuatrl"lon, gn-;oB- 31*t ,g1tr,
Owners Name: I Addess:PhoFe:
Architecuoesignen I Address:Phone:
Engineer:Adclress:Phone;
Detailed descriptio,4 of work:---"-'---"'--R . -' r.^L - ,*^ R PqgJ
WorkClass: Ncw() AddlUon( ) Remodet ( ) nepai.0/Oemo(i Otn"rt I
Work Type: hterior ( \ E*rtor lwf Son t I Does an EHU exist ai this locstion: Yes ( ) No ( )
No- 0f Existlng Duelling Unite in fris building: I No. of Accommodation Units ln thls buitding:
llg/TlEe {Flr€places Existino: Gas cEs Logs ( } Wood/peltet L ) Wood Bumtnq ( )
l,lqllvoe of Fireplaces Poposed; Gas Applianccs ( ) Gas Loqs ( ) WqodPellet ( ) Wood Burninq (NOT ALLoWED)
Does a Fire Ahrm ExFt; Y.s_( ) No 1
rr|s'bl'lr.'rrrtrrr|i.r |rit'rrr.rrrrr FOR OFFICE USE ONLWi*i* iai;j;Fr'''r
{stJ
"':' * " r, t\
-.-t i, i .l $,tr.trt*I
,t
Department of Community Detehpment
75 South Frontage Road
Vail, Cohrada 81657
970-479-2 r38
FAX 970-479-2452
urwu. uailgou. com
June 15, 2009
Stephanie L & Ralph V Yarusso
C/O RS Management Services
5101 S Broadway
Englewood, CO 801 10
SENT VIA CERTIFIED MAIL
Re: Expired Plan Review: Permit#806-0260, Yarusso, 5'1 39 Gore Circle
Dear Property Owner(s),
A review of the Town of Vail Community Development files indicates that the permit listed above
was never paid for or picked up. This permit was approved on 99/0@, and the contractor, Drury
Brothers Roofinq, was notified. Permits must be issued within 180 days of notification or they
become expired per the 2003 International Building Code, section 105.3.1, as is the case here.
n lf the work was completed, this permit must be paid for in full and issued, and inspections
scheduled to verify code compliance. The total amount due is $325.16.
! lf this work was never completed, the plan review fee must still be paid as we comPleted that
work in response to the application being submitted. The plan review fee is $126.91 .
While contractors typically submit permit applications, property owners are ultimately responsible for
the permits on their property per the 2003 International Building Code, section 1 05.1 .
I encourage you to contact me at (970) 479-2142 with any questions.
Sincerely, - /I tl 1v=_
Martin A. Haeberle, C.B.O.
Chief Building Official
Town of Vail
cc: contractor (regular mail)
n RECYC]XD PA.PER
Account
Account: R011535
Location
Parccl Numbcr 2099-182-02-007 Owner Name YARUSSO,
Tax Area SCl03 - VAIL (TOWN) - STEPHANIE L' & RALPH V'
SCl03 Owner Address C/O RS
Situs Address 005139 6ORE CIR MANAGEMENT SERVICES
!-ryr!9*ryrysr!a!ri,!sl' " ;l-%Jr"r'136fl%4"*0,,0 BIGHORN 5TH ADDITION Block: 2
Lot: 7 BK-0287 PG-0343
BK-0435 PC-0484 0t-26-86
BK-M35 PG-0484 SWD 0l-27-86
BK-0244 PG-0153 0t-02-76
Transfers
Page I of I
As$g-ssment History
Actual (2009) $ 1,358,270
Primary Taxable $108,120
Tax Area: SCl03 Mill Levy:46.1240
Type Actual Assessed Acres SQFT
lnprovements$358,270 $28.520 2319.000
Land $1.000,000 $79,600 0.505
Book Page
B: 0653 P:07E4
B: 0568 P: 0509
B: 0287 P: 0343
BlO244 P: 0153
Ow'n_crl n_forln_sliotr
Sale Price Stle Date
s489.000 t0/28/t994
$340.000 t2/04n991.
$5"000 Q6n0/1e79
$L4J00 0ur3/r976
Reception Number
Images
a trlt
http://property.eaglecounty.us/assessor/taxweb/accountjsp?accountNum=R0l 1535 06/09/2009
ru
trt
ru
ru
-J -.F
m
EO
l'I
E E
EI
--o ru
ru
m E E Y1,LS5()
s;t=' 4t_0i, 9_,.,tP+l {:rcVw
-l
---
-
-
--
-
ol fl
.s
fr
fr
fl
Ifl
{E E
LTJ
ru
ru tr E
E E E tr|
TF trl
-F tr
ru
ru E
ru
O CJ)dg
di=
< iD'$r DQO Ep IO
gB-
ST ?P
BE
m('l
<5o o--1U)Ro cLo
z }{
X
H
n
sup F:rX
s $.*
I \$$si
oo -S n en s'{+s \s
€'
F\
R s$ir\ X s
C.:' F|
(-"
gf
!
ri
F;l!
ti
E
D {c{r zFtFt s D3i O EIIC N r-tr
n Ftz ou {{Fl oto
F 1lzltt
QOFI I{Z EO DXrl 4?.t sof EO a
o o
P
t0
o
ut
E o
i tr-o
:P :-o l- tl
='{: {,1 *o
a-$-6
=E :-(l
;-
=*:-P
:{
=0 .:I i'o io a-o -_ i,l tr{
LP :-{
I (,
o
i ,J
I
I
?
il#),{ :.-
fr4nor frh
/of'7, blL P
{:i{frL,rtl-l Ll€\,tl[,i'\l! h i
Design Review Board
ACTION FORU
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2139 fax2 970.479.2452
web: www,vailgov.cem
Project Name:
Proiect Description:
Participants:
Project Address:
5139 GORE CREEK CR
Legal Description:
Parcel Number:
Comments:
DRB Number: DR8070542
FINAL APPROVAL FOR A DEAD TREES REMOVAL
owNER YARUSSO, STEPHANIE L. & MLP10/01/2007
C/O RS MANAGEMENT SERVICES
5101S BROADWAY
ENGLEWOOD
co 80110
APPUCANT YARUSSO, STEPHANIE L. & MLP10/01/2007
C/O RS MANAGEMENT SERVICES
5101 S BROADWAY
ENGLEWOOD
co 80110
5139 GORE CR VAIL Location:
Lot: 7 Block: 2 Subdivisionr BIGHORN 5TH ADDfiON
2099-182-0200-7
Please replace trees w/i 2 years
Motion By:
Second By:
Votel
Conditions:
BOARD/STAFF ACTION
Action: STAFFAPR
Date of Approvah 1010412007
Cond: CON0009435
(P|-AN): No changes to these plans may be made without the written consent of TOV.
Condi 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval,
Cond: 202
Approval of this project shall lapse and become void one (1) year following the date
of final approval, unless a building permit is issued and construction is commenced
and is diligently pursued toward completion.
Nicole Peterson DRB Fee Paid: $20.00 Planner:
All proJects r€qutrlng deslgn revlew must recelve approval prlor to submlttlng a bulldlng p€rmlt appllcaUon' ,Please
refir t6.Sre submlttal requlrements for the particular approval hat ls requested. An appllotlon for Deslgn Revlew
cannot be accepted unui all requlred lnformaUon ls recelved by $e Communlty Development Department. The
prolect may also need to be revlewed by the Town Cotrncll and/or the Plannlng and Envlronmental Commisslon.
beiton milew apprciral lapres unlecs a bulldlng permlt lr lssued and constructlon commanoes wlUtln
Application for Design Revlew
Department of Communlty Development
75 South Frontage Road, Vall, Colondo 81657
tel: 970.479.2t29 f a* 970.479.2452
web: www,vallgov,com
l(l v
P
CA'o
\,o
,(4
rJ
Mrnor Extenor AEerauons
General lnforlnauon:
onc ycar of tie opproval.
Deccrlptlon ol the Request:
Loca$on of the Proposal: tot; ? Bbck:-a(- subdlvlslon:$r 7 /.u"t fz* /]POt*l
phyercaf Addr€s$f Q3q .6-4e c'z , z fr/l^
Parcel ]{o.:!!J(c-onaa Eagle C.o. Assessor at 970-328-8640 for parr.el no')
Name(s) of Owner(s):
Malllng Addressl
Owner(s) Slgnature(e):
ilame of Appllcant:
Malllng Address!
Type of Revlew and Fee:
tr Slgns tr Concephlal Revlew
tr New Constructon O Addltlon
Mlnor Alteratlon
(multl-hmlly/commerclal)
Mlnol Alterauon
(sl n gle.tamlly/du plex)
Changes to Approved Plans
Separatlort Request
$50
No Fee
$650
9300
$250
?\J t4'
PI$ $1.00 per sguare foot of total sign area.
For cDnstructlon of a new bullding or
For an addltlon where square footage ls added to any resldentlal or
already approved by Plannlng Sbff or the u
tr
commerclal bulldlng (lncludes 250 addltlons & Int(rlor onverslons).
For mlnor dlanges to buildlngs and slte lmprovempnE, sUch as,
re-rooflng, Palnung, wlndow additlons, landscbplng, ' fences and
retalnlng walls, etc.
$20 For minor changes to bulldlngs and slte lmprovements, such as,
lR'rooflng, palnung, wlndow addluons, landscaplng, fences and
rEblnlng walls, etr.
$20 For revlslons to plans
Design Rwlew Board.
No Fee
il i-- ft \\/,r li,F
=-** I \V/ li;i il-
OCT ti I 2007
I
TOWN OF VAIL
3UUf, HU3 $3Nr3t^l :l^loul V6t-tLa La@e-T'-Ll.o
I
trt7'd e9be6Lba/"6trtal bb9els69987
I
t,
oca,nt f,rrY OEvrlaP|iEr{t
Binro, fr+,
Uo* Z, dbL Design Review Board
ACTION FOR],I
Department of Community Development
75 South Frontage Road, Vail, Colarado 81657
tel: 970.479.2139 fax: 97O.479,2452
web: www.vailgov,com
Project Name: YARUSSO REROOF
Project Description:
Participants:
Project Address:
Legal Description:
Parcel Number:
Comments:
DRB Number: DR8060312
FINAL APPROVAL TO REMOVE WOOD SHAKE ROOF AND REPLACE WITH PRO PANEL II IN
ANTIQUE BRONZE rN COLOR.
owNER YARUSSO, STEPHANIE L. & MLP0Z17i2006
C/O RS MANAGEMENT SERVICES
5101 S BROADWAY
ENGLEWOOD
co 80110
APPUCANT YARUSSO, STEPHANIE L. & MLPOZ1Z2OO6
C/O RS MANAGEMENT SERWCES
5101 S BROADWAY
ENGLEWOOD
co 80110
5139 GORE CR VAIL Locat.on: 5139 GORE CIRCLE
Loh 7 Block: 2 Subdivision: BIGHORN 5TH ADDffiON
2099-182-0200-7
See Conditions
Mouon 8y:
Second By:
Vote:
Condltions:
BOARD/STAFF ACTION
Action: STAFFAPR
Date of Approval: 08/02/2006
Cond:8
(P|-AN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Concl:0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval.
Cond: 202
Approval of this project shall lapse and become void one (1) year following the date
of final approval, unless a building permit is issued and construction is commenced
and is diligently pursued toward completion.
Planner: Warren Campbell DRB Fee Paid: $2O.OO
Department of C-ommunity Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2128 tax: 970.479.2452
web: www.vailgov.com
General Information:
All projects requiring design review must receive approval prior to submitting a building permit application. Please
refer to the submittal requirements for the particular approval that is requested. An application for Design Review
cannot be accepted until all required information is received by the Community Development Department. The
project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission.
Design review approval lapses unless a building permit is issued and construction commences within
one year of the approval.
Description of the Request:
Conceptual Review
Application for Design Review
t*4 Phone: SoJ ffi(?7 <
U
d
6)
o C
o
(,'..)
tL-
A)
4
Location of the Proposal: Lot: / Blcr;k|. 1 Subdivision:-----g_--.---=-
.frs t e"."dno.fu(
Zoning:
'\iH';"):/t4-
,"r,
Type of Review and Fee:
Owner(s) Signature(s):
Name of Applicantr
tr Signs
D Conceptual Review
tr New Construction tr Addition
tr Minor Alteration
(multFfamily/commercial)
Minor Alteration
(si ng le-family/duplex)
Changes to Approved Plans
Separation Request
tr
tr
$50 Plus $1.00 per square foot of total sign area.
No Fee
$650 For construction ofa new building or demo/rebuild.
$300 For an addition where square footage is added to any residential or
commercial building (includes 250 additions & interior conversions)'
$250 For minor changes to buildings and site improvements, such as,
re-roofing, painting, window additions, landscaping, fences and
retaining walls, etc.
$20 For minor changes to buildings and site improvements, such as,
re-roofing, painting, window additions, landscaping, fences and
retaining walls, etc.
$20 For revisions to plans already approved by Planning Staff or the
Design Review Board.
No Fee
Physical Address:
Contact Eagle Co. Assessor at 970-328-8640 for parcel no.)
Name(s) of Owner(s)r
Mailing Address:
F."Jr:ff ?t?ry' cnar no.,4 8 /
,*,"nO@
*tt***+******a*********+*+**tl**ti*t*+*:f*************************+*+++***********+************
TOWNOFVAIL. COLORADO Statement ***********+***** ****** * * t'.*** ********+tlr* + * +***+* * {* ************* ** ***** * *****f f **++***** * * *
Stat,ement Nurnber: R050001000 Amount: $20.00 07 /I7/ZOO6LO:52 AM
Payment Methodr Check
BROS ROOFING
Init : ,fS
Notation: 3 814 /DRIrRy
Permit No:
ParceL No:
Site Address :
. Location:
This Payment:
DR8050312 Tt4)e: DRB -Minor Alt, SFR/DUP
2099 - L82- 0200 -7
513 9 GORE CR VAII,
513 9 GORE CIRCI,E
Total Fees:
$20.00 Total AJ,IJ Pmts:
Balance :
$20.00
$20.00
$0.00
* ** **** *******+* ******** * + * ***t* i + +* ** ++** +++**++** *** ** *** * * ***** ** +** ** *+ ** * **** * * +*+* ++*+
ACCOUNT ITEM LIST:
Account code Description Current PmtE
DR 0 0100003 rL2200 DESTGN REVIEW FEES 20.00
26ga PVDF (Fluorocarbon)/Kynar 5OO Golors
Lincn Whftc (El l Kfiqki (88)
rffiI
do$k Orccn (66) Zinc Gruy (291 lurnirhcd 5lofe (49)Iffi
Pckior rcd (73)
26ga MS Colorfast45*
Otcon lluc (35)
Polor t{l$te (E0)
ffi I
lumirhcd Slotc 149)rffi
Orcon Blue (351
'.1- ..:it:{-! rir rr rr,i:-l.i,.. - _.
€ir1111r!r;lrriri+rtl"riri-1 t,: :. :
1i.!:+tt+;il1.,jt '}",*t: r: : j. ,
/.i,li ni ,Qti,rr' 1,ar..t-i \. .,, , -.
!ll}r]nv':]i!+';
Porino Grcer {5tl
26ga MS Colorfast45* (Western)
&h crcy (25)I
Burgundy (15)llocho fo (15)Potriot Rcd 173)
m m n m
-
Chorcool (17)
forcrt Grccn (26)
H,qwdion Uuc l7O)
Uglrr Srmc 153)
Ash Orcy (251 Chorcool (17)Polor lVhirc (E0)Ugl* Stqrc (631
Sirro Grcon (20)
to.Gsr Oracn (26)
cdvduoc lal )
&ick Rsd {241 IGI
Co(o Brown (12)
Not a[ colors are stocksd at all branifiG. Additional ao6t and load-tims is possiHe with cortain colors, Pleaso inquire.
Color selectiom are dos6 roFG3€r ations but are limited by procersing and viewir€ conditions.
AGUral a€rrple €olor ehipr arc .vailaHe by requ6t.
u),-Ju. Me\<^,[ sJes''t2s. Qr+r $r- <:e6,,-
Fcm G?.!n (07)
Pr- 'f/t'nle &
TOWN OF VAII.,,
75 S. FRONTAGE ROAD
VAIL, CO 81657
97 0-47 9-2t38
Ptan Check---) 3.75
Job Address
Location, . .
Parcel No,.Project No.
DEPARTMENT OF COMMUN] TY DEVEI-,OPMENT
NOTE: THIS PERM]T MUST BE POSTED ON ..TOBS ITE
Permit PI.,UMBING PERMIT
5139 GORE CR
5139 GORE CIRCLE
2099-I82-02-007
AT ALL TIMES
P9 6-014 6
StaLus...: APPROVED Applied..: 09/os/Lge6 Issued...: 09/09/1996
Expires. . : 03/08/1,997
Phone: 926-5492
Phone z 926-5492
APPLICANT K.W.'S PIPE FIXATION
P.O. BOX 1437, EDWARDS, CO 81632
CONTRACTOR K.W.'S PIPE FIXATION
P.O. BOX 1437, EDWARDS, CO 81632 OVINER YARUSSO STEPHANIE L & RALPH V
507 PROVTDENCE DR, CASTTJE ROCK CO 80104
Description: fNSTALL GAS LfNE FOR BBQ & POSSIBIJVaLuation:E 250.00
***ffi*ffiffiffiffi*'t'tJr*rtrt#lffi*ffiFEEsUl'|l4ARY*ffi******Hffi*ffi*#********ir****f,*ffiffi*
P Lumbi ng-----)15.00 .00
21 .75
Restuarant Ptan Review-->
TOTAL FEES-----
Investi gat ion>
Uil.t Ca t t---->
.m
3.00
?1 .75
.00
21 .75
.00
21 .75
TotaI Calculated Fees--->
AdditionaI Fees--------->
TotaI Permit Fee-------->
Payments-------
BALANCE DUE----,t* *ffir*|t**ttffir*ffi**#(*ff*ffiffiffi*******ir**ffrffiffi**
Item! .051Q0 EqILDING DEPARTMENT Depr: BUILDING Division:09/09 /1996 CHARLIE Action:--AFFn Cnenr_,rE DAViS
*ff****ffi**ffiic*'t*rffiffi.*i(rH('(Jr,di(Jrt'QffirJ.**Jr***#r***ffrffi**************ffirHrr*tr**ffiffi*tnts*.*.f,irr*,nr*ffi
CONDITION OF APPROVAL
1. airt GAs pIpINc MUST coMpl,y WITH 1994 UpC CHAP 12 2. FIELD TNSPECTIONS ARE REQ'D TO CHECK FOR CODE C6Upr_,rawce
ir*irffi Wffi *******ff *ffi ***********ffi rffir**rpt#oHrH.**ffir*******
DECLARATIONS
I hereby acknowtedge that I have read this apptication, f il,l,ed out in ful,l, the infornation requi red, compLeted an accurate ptot p[an, and state that att the informatr-on provided as rcquired. is correct. I agree to compty uith tire information and ptot itan,to comPty t{ith atl' Town ordinances and state [aws, and to buiLd this structure according io'the Town's zonint ano subdivisibn codes/ design revieH apProved, uniforn Buitding code and other ordinances of the Tovn aipLicabl.e thereto.
REOUESTS FOR INSPECTIONS SHALL BE I4ADE TIIENTY-FOUR HoURS IN ADVANCE BY TELEPHONE Af 479-2138 OR AT OUR OFFICE FROtt 8:OO Att 5:OO p
Sr
Tcontact Eagle CounEy ,1"""""f of f ice
, APPLICATTON MUST BE FILLED
I********************** rt***** **fll I J-Building p(]-plunbins t
PEzuIIT i.
OUT COMPLETELY OR IT T.TAY NOT BE ACCEPTED
PERI.!rT TNFORMATION ************** *** * ***** *** ** *
l-Electrical [ ]-Mechanibat [ ]-other
Address:
Address:
Job Name: /40u,<r /eS Job Addre"=, 5/3g Gefz_ Clf
Legal Description: Lot Block_ Filing sunnrvrSron,
Owners Nane:
Architect:
ceneral Description:
work class: [ ]-New [ ]-Alteration fll-Additional [ ]-Repair [ ]-other
Number of Dwelling units. J- Nunber of Accornrnodation units:
- {prnber and Type of Firepraces: Gas Apptiances_ Gas Logs_ wood/perlet__v rt********************************* VALUATTONS *********************************tl Pqc-olL/te :yl!?Hq, Er,EcrRrcAL: $___ orHER: s r pt,rrl,rBrNc z e[38;T nEcHAir-iA;; i: _ ;;;ff; i-
f***************************coNTRAcTo*****----;-;;;-*m f Eeneral ContracEor: nl^?.,i ^- r,-.!, h-_;;;::::. \,L,rrL.Lcr(,\-\JL. Town of VaiI Req. NO.ALTqI E5S;
ELectrical Contractor:
la-le^--atlt\-ll e=r5 ;
Plunbing Contractor: K,J,Town of VaiL Address:Phone Nurnber:
Mechanical Contractor:Address: _ Ipy:-": vail Reg. No._
Phone Nurnber: _
******************************** FOR oFFrcE usE *******************************
BUTLDTNG PI,AN CHECK FEE:
PLIJMBTNG PIAN CHECK .FEE:
MECHANTCAL PI,AN CHECK FEE:
RECREATION FEE:
CLEAN-UP DEPOSIT:
TOTAL PERMIT FEES:
Ph. q)6-?3
BUILDING PERMTT FEE:
PLUMBING PERMIT FEE!
MECHANTCAL PERMIT FEE:
ELECTRICAL FEE:
OTHER TYPE OF FEE:
DRB FEE:
BUILDTNG:
SIGNATURE:
ZONTNG:
SIGNATURE:
VALUATION
SLEAN ITP DEPOSIT REFI'ND
75 south frontage road
Yail, colo.ado 81657
(3os, 479-2L38 or 479-2L39
TO:
EROM:
DATE:
SU&TECT:
ottlce of communlly developmenl
ALL CONTRACTORS CURRENTLYL REGISTERED WITH TIIE TOI.{N OF VAIL
TOWN OF VAIL PUBLIC I{ORKS/COMMUNITY DE\TELOPMENT
MARCH 15, 1988
CONSTRUCTTON PARKING & UATERIAL STORAGE
rn summary, ordinance No. 6 states that it is unlawful for any person to litter, tracl<. or deposit. any ,"ifl-"".i, sand,, debris ;;rffi*.i3ii"r.'l!tlgins trash iu'i=t"ri, poit"rie- toireii ;il---
11 ?:" ;' ;;;;;lff "d:I"3"l'"1;"=:i;Hil 5;-ili'L":, i"il*i'-.,Vait streets and.Igag" is approxir.l"iv-s-it.-lti pavemenr.This ordinance w-ir] re.;ati;ii;-lnforcea by the Town or vair.Pubric works DeDartment- persins found tiiruti'g this ordinance will be siven a 24 hour r.iii""-'"otice-to-;;;;;;"=uid nareriar.rn the event the person so notified.does not compry with the notice within the 24 hour time sfiecifiea, the pul:.ic Works Departrnent wilr rero.r" JiiJ-r.t"iiut _"t the expense of person notifi-ed' The provisions .t-ini= ordinance shal1 not be applicable to c-onstruction, o,uirt"r,ur,9e o-r repair projects of any street or al1ey or any utilities in the right_a_way.
To review Ordinance No. 6 in full, please stop by the Toqrn of :::i"::ii:i"g,TRi:'il:$.::-'";I;i" a copv- rirani vou ror your
(i.e. contractor, owner)
-rI I
+
(!
m r4
!-o l-..h E l<x f tf,i ;l9n I li= s lmP cl l.r,/ in O l< -r I l=E 5 i5
o<1s,dE 8t ct >t 7E ii=
'll
m
-.{
=fl8 tn=
Ep"t-
!trEl
n!!
o o z o {F c o {
6 z
!lft F 3
{
'Tl -Il
Or-
z=0tD 2=
=tr z
!m n
=
=z o
E:f,
d g,E
8+B l=r
'<!t
{E@-',
1*e'J-+
-.o It a*-
id=
=.'P =o) o
Q ia ret a3i
a*o
e- d€! sr!
Dt -='-f+i6
6',9.3
^fl
5i=
e4s
=eg tE -.o,d==s.=i*=
=ii .'@='
iEa
fis+
eqE (,,o='0rxo o --*
.rFYg g 'i 9-'/ -9t
J90 fEa fo J-.ii s.
*i-.-u
I t".Oa a = (r,
'Pb +dq ..
='o (O 0r o8 oo
&4
33
oo
=-dd A s:\ex -. \i ;-
.JON -\- o o \\("J .. \o 5'J\-:,o '\e3
\ \r o"
s-3 e v\fo lY.b s
) \'F s.) p.9.
t 6'9 l orr
FS +3 69 6o.xo Yat 6'
>(,z^
JI
mc
I
o
d
tr
a\
Or
F.
q)z tq mil
lE' I l'- |l!o EO 16 'O
F lo t'n
-It
m t
-{{o
@
m x
m T {
o z c o
@ (r,f m
O
C)(u
r\
N)
-.t
'n
€z m
z -{
.!l
=an n r 'tl
im nz,>m on --.t >
F
e
@ z
=IT
{H ti v)
z
v)H
c)
oEE :FE r L:.i -p tg ;B tg t ltr lz ; lt" 16 llz c)t I O I t! lc.tol txtc)IFE I r- lf4 ! | NJ lrd - lol<s. I o, |tr1 !t I o'l l€ttiH {l ltr's. I l(/t {l lo Nl lz
4o
--.':qn
9p -{c 3<<@
d3 u
@ r
-11
=z.
H
p
E t H
E tr ts H ts o E
l{to
t€lz
lo
l.l1 t<t>
lF l!lm
le,lz
le
l-{|o
l€
lz lo l'n l<I>
lF
lfi lz
l-{to
l€
lz lo l'l t<t>
lF
lm
Lo
la
l-r to
l€
lz lo
l-n t<t>
lF ll lm
lF,tz
I
=P z
t{F
u)
v)
H
{m
H
(t
H
-r l-l I mto I
'|: I
dB I ttFl (Jr l_ |
;ln I
916 |-Nl
KJ
l''!
IO [€ri\ m IF
26
.z :
-l I
o x z
m o
-c m
l
z
r-
m
=o
a
z
t-
m
P ]|
ONF fo{fi a*!:l .i F io aD_tl Xzat d; Qo o'<2 - e9 3: gH
z9
-nzz
€
7
P>_
N@=
l,:l-
t<
=
H
X H rt
El
rE lz
tv)
lz tx
I
I
I
I
i
\o
lJ
=z
a
-{
z
F
@
F
z o z o -{m o
z r-
F
z
FI
(t)
H
rll
F H
rq z u)
rt,
o
-1
t-T m n
=
='n
m m v)
o |-m
z
m
U'i
=z
_9
m
=
'o m
3
=al m m
at,
VALUATION
"=:.:?-7
--t
a-
--
m fa,F9 s!
!lt :l x-:g *e la n=<E !1.o<ta 6t
-C|n;
'-2 t >3 6i
o
!,n !3
-a
rE
EEIE 9" l;.- It
l=
o o o z o
F c o
=o z
!
rn 7
={
z
-.t m
I
11
!m
-t
-t o
m x ;im si
z
o
ID o
-{m
!m t
=
b
z
3
IT
F
F.
tl)!
E
U
:r
o m z tn 7
m
m o
,o
oS
q {q\
{s
tl
E
t;
l3
l5
lall
lp t2
I
I|lt
E
EH ttF E2 l
Els
il
ts Io
l€
lz lo
ln t<t>
|r
lm
lp lz
t9
I
I
I
I
I
I
n
\
:
Y
:r.
t
l-{
lcr It lz
JO
Fr t<
li tn
lc tz
I
I
I
HliE F'a i g
Fiu-E
lFii=I
rl
z
>t !t |nI
>t
rl
?l
;l
:
z
i
t:
lrn
t>ll
t;,J t-
2A
:
|'t
:r {
?
!si >
-l
2
D |-!m
3
q,
2 m m
m
l<'
dl
HI
ol :l
=l ml ,l
ol ri
o o z -a t
o -l a !
o
I 3 o m 7 n
VALUAIION
o |-
a
!
' ot, .
il jrH \-r r\
t--- ll)
,l
I
\NA
iF'E
IFr
!!
1t!
=t-:=
2=6"2
o-O :.O
x,F.r
C-?
cf
t,.)
-9
73 aoulh fronltga rold
Y.il, coloredo E1657
(303) 479-2138 or 479-2\39 oftlco of communltY dcvcloPmottt
BUILt)ING PERI{IT ISSUANCE TIME FRANE
If this permit requires a Town of Vail Fire Department Approva'l ,
Engineer''s (Public Works) review and approval , a Planning Department
review or Health Department revjew, and a review by the Building
Oepartment, the estimated time for a total revjew may take as long
as three weel(s.
All commercial (large or sma'l'l) and al'l multi-family permits will
have to follow the above mentioned maximum requirements. Residential
and small projects should take a'l esser amount of tjme. However, 'i f
residential or smaller projects impact the various above mentioned
departments with regard to necessary review, these projects may
also talte the three week period.
Every attempt wi'l I be nnde by this department to expedite this
permit as soon as possible.
I, the undersigned, understand the p1 an check orocedure and time
frame.
r'-/^-
I
ffirned into the
Department.Communjty DeveloPment
75 south tronlagc rord
v.il. colorado 81657
(303) 479-2138 or 479-2139
TO:
FROM:
DATE:
SU&]ECT:
offlce ol communllY develoPmcnt
ALL CONTRACTORS CI'RRENTLYL REGISTERED I{ITH THE
TOWN OF VAIL
TOWN OF VAIL PUBLIC WORKS,/COI,I}ruNITY DE\TELOPI,IE}IT
I{ARCH 15 , 19 8I
CONSTRUCTION PARKING & MATERIAL STORAGE
In sunnary, ordinance No. 5 states that it is unlawful for any
person to litter, track or deposit any soil, rock, sand, debris or material, including trash dunpsters, portable toilets and
workrnen vehicLes upon any street, sidewalk, alley or public place or any portion thereof. The righE-of-way on all Town of VaiI streets and roads is approxinately 5 ft. off, pavenrent.this ordinance will be strictly enforced by the Town of VaiI Public Works Departnent. Persons f,ound violatlng this ordinance will be given a 24 hour written notice to remove said naterial.fn the event the person so notified does not conpl.y with the notice within the 24 hour tirne specified, the Public Works
Department will remove said naterial aE the expense of person notified. The provlsions of this ordinance shall not be applicable to construction, naintenance or repair projects of any street or aLley or any utillties in the right-a-way.
To revlew ordl.nance No. 6 ln full, please stop by the Town of Vail Bulldlng oepartrnent to obtain a copy. Thank you for your cooperation on this natter.
.l
(i.e. contractor, owner)
Plan Revier Baged on the 1992 Uniform Codes
NAME: WILSON STUCCO
ADDRESS: 5139 GORE CIRCLE
VAIL, COLORADO
OCCUPANCY: R-1
TYPE OF CONSTRUCTION: V
DATE: 5*1-92
CONTRACTOR: ANGLADA STUCCO
ARCHITECT: NONE
ENGINEER: NONE
PLANS EXAMINER: DAN STANEK
CORRECIIONS REQT'IRED
Tbe itens listed below are not intended to be a complete listing of all possible code requirenents in tbe adopted cod€s- It is a guide to gelect€d s€ctions of the codeg. Tbe folloring ie not to
be construed to be an approval of any violation of any of the pro-
vigions of tbe adopted codes or any ordinance of, tbe Town of Vail..
].. SMOKE DETECTORS TNSTALLED IN ALL BEDROOMS AND HALLS AS PER
sEc.1210 199r. UBC.2. srucco ro coMpl-,y wrrH cH 4'l oF L991 uBc.
o f
o o
CTION
TOWN OF
REQUEST
VAIL PERMIT
DATE
CALLEB
TUES
f 'Z)
READY FOR INSPECTION:FRI UR
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
D ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
- ROOF & SHEEFI " PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL / H. TUB
FINAL
D SHEETEOCS ,NA|L kf' ( r1fl-"
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
O HEATING
ROUGH O EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr FINAL tr FINAL
PROVED
CORBECTIONS:
O DISAPPROVED tr REINSPECTION REQUIRED
INSPECTOR
INSPECTION
TOWN OF
t \
REQUEST.VAIL T
DATE <l
,w AM ON:E
\ ^\\ r\ \c'-- t
JOB NAME \J\.J \-\)\\(\
fu$--n\
CALLE
WED THUR READY FOR
LOCATION::\l INSP
(.-- \
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
O UNDERGROUND
O ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
O FRAMING
n ROOF & SHEER " PLYWOOD NAILING O GAS PIPING
tr INSULATION
O SHEETROCK
O POOL / H. TUB
tr FINAL
tr
n
E]FINAL
ELECTRICAL:
O TEMP, POWER
MECHANICAL:
tr HEATING
tr
tr
tr
ROUGH tr EXHAUST HOODS
CONDUIT D SUPPLY AIR
tr FINAL
tr
tr FINAL
,!,neenoveo
CORRECTIONS:
O DISAPPROVED O REINSPECTION REQUIRED
DATE INSPECTOR
l'I
Project Application
uate
Name:v\-Project
Prolect
Contact
Desbription:
Person and Phone
Owner. Address and Phone:
Architect, Address and Phone:
n / . r-'lY\OW\r)r(\ "j'--'' , zo^u
U
Block F iling Legal Description: Lot
Com ments:
Design Review Board
Date
Motion by:
Seconded by:
A PPROVA L D ISA PPR OVA L
D Stalt Approval
pA {h D(r} ftL
:.|
nl o 6 o
m '-.t-
,@
,(,m
-t -
DRB APPLICATION - TOI{N OF \TLIL,
DATE APPLICATION RECETVED :
DATE OF DRB MEETING:
COIPRADO
**t*t***t*
TSIS APPLICETION WILI' NOT BE ACCEPTED
T'NTIL ALL REQUIRED IIIFORI,IATION TS SI'BI{ITTED
tt****tt**
r€viaed e/4/eL
i 1gg2
I.W:
A. DESCRIPTION:{Lr.. 1'. '/,2'-u n nr /ont-
B.TYPE OF REVIEW:
New Construction ($200.00)
7\-1,-li f .i ^- /CRn nn \,r1\1\rrLr\Jrr \YJv . vw,/
ADDRESS:
^+.- ^^L .- ^ +1^ i ^ ^*^1 .i ^-+ i clL Lcr\-rl L(J !llrD q.PPr-Luq.Lr
Mail-i-nq Address:
artacn ro tnrs app.LlcaEron,
4 / ,/.
ZONING ' Jtrtele /'ft*r' l/
L/l+inor Alteration (S20. 00)
Conceptual Review ($0)
Pncne 4'76-7q7?--
n
R
F
l{
LEGAL DESCRIPTION: Lot. 7 -B]ocK \l,
subdivisio n 4tA Uo,eP ^ 5tu ftazihlP
If property is described by a meets and bounds lega1 description, please provide on a separate sheet and
NAME OF
Mai I ing
APPLICANT, S REPRESENTATIVE :
Address:
Aro ,J e,'
Phone
NAME OF OWNERS:/ cSo^J
*SIGNATURE (S) :
Mailing Addre
Pho
J. Condominium Approval if applicable. nl,/n ,/
K. DRB FEE: DRB fees, as shown above, are to be paid at the time of submitLal of DRB application. Later, when
applying for a building permit, pl-ease identify the
accurate val-uation of the proposal. The Town of Vail wrll adjust the fee according to the table below, to t ensure the correct fee is paid ^ .\
rnn PerPt s /a'a;o [-'''
FEE SCHEDULE:
VALUATION $ 0 - s 10,000 $ 10,001 - s 50,000
$ 50,001 - $ 150,000
s150,001 - $ 5oo,ooo
$500,001 - $1,000,000 $ Over $1,000,000
FEE s 20.00
$ s0.00
$100.00
$200.00
$400.00
$s00.00
* DESIGN REVIEW BOARD APPROVAI EXPIRES ONE YTAR AFTER TT}TAI,
APPROVAI UNLESS A BUILDING PERMIT IS TSSSED AT{D CONSTRUCTION IS
STARTED.
**NO APPLICATION TILL BE PROCESSED WITEOUT OI|NER'S SIGNATT'RE
II. PRE-APPLIcATIO?MEETING:
A pre-application meeting with a member of the planning staff is strongly encouraged to determine if any additional-application informati-on j-s needed. It is the applicantrs responsibility to make an appointment with the staff to determine if there are additional submittal- requirements.
Please note that a COMPLETE application will streamline the approval process for your project.
III. IMPORTANT NOTICE REGARDING ALL SUBMISSIONS TO THE DRB:
A. In addition to meeting submittal requirements, the applicant must stake and tape the project site to indicate property lines, building lines and building corners. AII trees to be removed must be taped. A11 site tapings and staking must be completed prior to the
DRB site visit. The applicant must ensure that staki_ng
done during the winter is not buried by snow.
B. The review process for NEW BUILDINGS normally requires two separate meetings of the Design Review Board: a conceptual approval and a final approval. Applicants
shoul-d plan on presenting their development proposal at a mini-mum of two meetinss before obtaininq final
approval ,
C. Applicants who fail to appear before the Design Review
Board on their scheduled meeting date and who have not
asked in advance that discussion on their i-tem be postponed, will have their iterns removed from the DRB docket until sueh time as the item has been republished.
D. The following items may, at the discretion of the zoning administrator, be approved by the Community
Development Department staff (i.e. a formal hearing before the DRB may not be required):
a. Windows, skylights and similar exterior changes which do not alter the existing plane of the building,' and
b. Bui-lding addition proposals not visible from any other lot or public space. At the time such a proposal is submitted, applicants must incl-ude letters from adjacent property owners and/or from the agent for or manager of any adjacent
condominium association stating the association
approves of the addition.
E. If a property is located in a mapped hazard area (i.e.
snow avalanche, rockfall, flood plain, debris f1ow,wetland, etc), a hazard study must be submitted and the
owner must sign an affidavit recognizing the hazard report prior to the issuance of a building permit.
Applicants are encouraged to check with a Town Planner prior to DRB application to determine the relationship of the property to aII mapped hazards.
F. For a1l residential construction:
a. Clearly indicate on the floor plans the inside
face of the exterior structural walls of the building; and b. Indj-cate with a dashed line on the site plan a four foot distance from the exterior face of the building walIs or supporting columns.
G. If DRB approves the application with conditions or modifications, all conditions of approval must be resolved prior to Town issuance of a building permit.
rv.
A. Three copies of a recent topoqraphic survey, stamped by
a licensed survevor, at a scale of Ln = 20' or larger,
on which the following information is provided:
Lot area,
Two foot contour intervafs unless the parcel consists of 5 acres or more, in which case, 5l contour intervals may be accepted.
Existing trees or groups of trees having Lrunks with diameters of 4" or more, as measured from a point one foot above grade.
Rock outcroppings and other significant natural features (1arge boulders, int,ermittent streams,
etc . ) .
Hazard areas (avafanche, rockfall, etc.),centerline of stream or creek, required creek or
stream setback, 100-year flood plain and slopes of
40% or more, if applicable.
Ties to exlsting benchmark, either USGS landmark or sewer i.nvert. This i.nformation should be clearly stated on the survey so that all
measurements are based on the same starting point.
This is particularly i-mportant for height
measurements. See Policy On Survey Information,for more information regarding surveys.
Locations of the following:a. Size and type of drainage culverts, swales,etc. must be shown,
b. Exact location of existing utility sources
and proposed service lines from their source to the structure. Utilities to include:
/r^t^ l ^ rit \-ctt-rre -L v
Telephone
Sewer Gas
Water Electric
c. Show aII utility meter locations, including
any pedestals to be located on site or in the right-of-way adjacent to the site. Revocable permits from the Town of Vail are required for improvements in t.he right-of-way.
d. Propert.y l-ines - distances and bearings and a basis of bearing must be shown.
e. AII easements (Title report must also include existing easement locations)
8. Existing and finished grades.
9. Provide spot elevations of the street, and a
minimum of one spot elevation on either side of the lot, 25 feet out from the side property lines.
Site Plan
1. Locations of the followinq:
a. Proposed surface drainage on and off sj-te.
b. Proposed driveways. Percent slope and spot
el-evations must be shown.
AII existing improvements including structures,
Iandscaped areas, service areas, storage areas,
walks, driveways, off-street parking, loadingr
areas, retaining wall-s (with top and bottom of
wa11 spot elevations), and other existing site
improvements.
B.
3
NOTE:
. These
el-evatj-ons and grades must be provided in order for the staff to determine building height. AII ridge Lines should be indicated on t.he sit.e plan.
El-evations for roof ridges shall- also be indicated
on the site plan with corresponding finished and existing grade elevations.
Driveway grades may not exceed 8* unless approved by the Town Engineer.
a Landscape Plan (!t' : 20' or larg'er) - 3 copies required
The following information must be provj-ded on the
landscape plan. The location of existing 4"
diameter or larger trees, the location, size,spacing and type (common and latin name) of aII existing and proposed plant materiai-. A11 trees to be saved and to be removed must also be indicated. The plan must also differentiate
between existing and proposed vegetation.
Complete the attached landscape materials List.
The location and type of existing and proposed
watering systems to be ernployed in caring for plant material following its installation.
Existing and proposed contour lines.
fn order to clarify the inter-relation of the various
development proposal components, please incorporate as
much of the above information as possible onto the site
p1an.
n Siqn off from each utilitv companv verifying the
l-ocation of ut.ility service and availability (see
attached) .
E
F
H
A preliminarv titl-e report must submittals, to insure property
of all easements on property.
Architectura] PLans (1/8" = 1/
accompany all
ownership and location
or larger , 1,/4" is preferred scale for review) 3 copies required.
Scaled floor plans and all elevations of the
proposed development.. Elevations must show both existinq and finished qrades.
One set of floor plans must be "red-Ij.ned" to show
how the gross residential floor area (GRFA) was
cal-culated.
Reductions of al-I efevations and the siLe plan (8-
L/2,' x 1.!,,\ for incl-usion in PEC and,/or Town
Council memos mav be requested.
Exterior surfacing materials and material colors
shal1 be specified on the attached materiaLs l-ist.
This materj-als list must be completed and submitted as a part of DRB application. Color
chips, siding sanpfes etc., should be presented to the Design Review Board meetinq,
Zone check List (attached) must be completed if project
is located within the Single-Family, Primary/Secondary
or Duplex zone distrj-cts.
Photos of the existing site and where applicable, of
adjacent structures.
.I . The zon} agmi119c5acor anci/or onfay require che
submissi-on of additional plans, drawings,specifications, sarnples and other materials (including
a model) if deemed necessary to determine whether a project will comply with Design Guidelines.
V. MINOR ALTERATIONS TO THE EXTERIOR OF BUILDINGS.
Photos or sketches which c1ear.ly convey the redevelopment proposal and the location (site plan) of the redevelopment proposal may be submitted in l-ieu of the more formal
requirements set forth above, provided all important specifications for the proposal including colors and materiaLs to be used are submitted.
VI . ADDIT]ONS - RESIDENTIAL OR COMMERCIAL
A. Original floor plans with all specifications shown.
B. Three sets of proposed floor plans I/8n = I' or larger (t/4" - It is preferred)
C. Three copies of a site plan showing existing and proposed construction. fndicate roof ridge elevations with existing and proposed grades shown underneath.
D. Elevations of proposed addition.
E. Photos of the existing structure.
F. SpecJ-fications for al-I materials and color samples on materials list (attached) .
At the request of Lhe Zoning Adninistrator you may also be required to submit:
c. A statement from each utility verifying location of service and avail-ability. See attached utility focation verification form.
H. A site improvement survey, stamped by registered professional surveyor.
I. A preJ-iminary title report, to verify ownership of property, which lists aII easements.
VII. FINAL SITE PLAN
Once a building perrnit has been issued, and construction is
underway, and before the Building Department will schedule a framing inspection, two copies of an fmprovement Location Certificate survey (ILC) stamped by a registered professional engineer must be submitted. The following information must be provided on the lLC:
A. Building location(s) with ties to property corners,i,e, distances and angles.
B. Building dimensions to the nearest tenth of a foot.
C. Al-l- utility service line as-builts, showing type of material used, and size and exact l-ocat j-on of f ines.
D. Drainage as-builts.
E. Basj-s of bearing to tie to secLion corner.
F. A11 property pins are to be either found or set and stated on improvement survey.
G. Al1 easements.
H. Building floor elevations and all roof ridge elevations with exi-sting bnd proposed grades shown under t.he ridge Iines.
vrrr .coNcEPTUAL pEfN REVTEVI
Submittal qequirements: The owner or authorized agenc of any project requiring design approval as prescribed by this chapter may submit plans for conceptual revj_ew by the Design Review Board to the Department of
Community Development. The conceptual review is j-ntended to give the applicant a basic understanding of the compatibility of their proposal with the Town, s Desj-gn Guidelines. This procedure is recommend.ed primarily for applications more complex than single-family and two-family residences. However, developers of single-family and two-family projects shall not be excluded from the opportunity to request a conceptual design review. Complete applications must be submitted 10 days prior to a scheduled DRB meeting.
The following information sha1l be subnitted for a conceptual- revj-ew:
1, A conceptual site and l_andscape plan at a minimum scale of one i-nch equals twenty feet;
2. Conceptual etevations showing exterior materials and a description of the character of the proposed structure or structures,.
3. Sufficient information to show the proposal
compli_es with the development standards of the zone district in which the project is to be located (i.e. GRFA, site coverage calculations,
number of parking spaces, etc.);
4 Cnmnlcl-cd FIRR ennl inrfinn €n - -rm.
Procedure: Upon receipt of an application for conceptual design review, the Department of Cornmunity Development shalL revj_ew the submitted materials for general compliance with the appropriate requirernents of the zoning code. If the proposal is in basic compliance wj-th the zoning code requirements, the project shall be forwarded to the DRB for conceptual review. If the appJ-ication is not general-1y in compliance with zoning code requirements, the application and submittal_ material_s shall be returned to the applicant with a written explanation as to why the Community Development Department staff has found the project not to be in compliance with zoning code requirements. Once a complete application has been received, the DRB shall- review the submitted conceptual review application and support.j-ng material- in order to determine whether or not the project g.eneral-ly complies with the design guidelines. The DRB does not vote on conceptual reviews. The property owner or his representative shall be present at the DRB hearing.
ll-
NAME OF PROJECT:
LIST OF MATERIALS
LS dt)k Cco k,b
LEGAL DESCRTpTTON: LOr 7 BLOCK L SUBDTvTSTON
srREEr ADDRESS: St3Q eote Cie/e, /Aic, Ca. KUf*
DESCRIPTION OF PROJECT:
nl ) /,ar..t
The following information is
Review Board before a final
BUILDING MATERIALS:
Roof
S iding
Other Wal1 Materials
Fasc ia
Soffit s
Windows
Window Trim
Doors
Door Trim
Hand or Deck Rails
Fl-ues
Flashings
Chimneys
Trash Enc I osure s
Greenhouses
Other
PLANT MATERIALS:
PROPOSED TREES
required for submittal to the Design approval can be given:
TYPE OF MATERIAL COLOR
,/.v/2
Botanical Name Common Name Ouantitv Size*
,./B. LANDSCAPING: Name of Designer:. A//*
Phone '
Mo^/e EXISTING TREES TO
BE REMOVED
*Indicate caliper for deciduous trees. Minimum caliper for
deciduous trees is 2 inches. Indicate height for coniferous trees. Minimum heiqht for coniferous trees is 5 feet.
JTc.cca Flc*r f (H/ti,rrey. (ttu ,+rr-Ac-,+€D e*rr)
a-./,tt f .v,/A
,/,
7" tlrc4 Sracca a,r'a StoEs ApD 9rc* oF /ou't€ '
PLANT MATERIAO
PROPOSED SHRUBS y'/x
Botanical Name Commonlme Ouantitv. Size*
EXISTING SHRUBS
TO BE REMOVED
*Indicate size 5 qaffon.
GROUND COVERS
cnn
SEED
TYPE
OF TRRIGATION
of proposed shrubs.
Tvpe
Minimum size of shrubs is
Square Footage
M/tr
tl /*
/t) t Y/*/
,/TYPE OR METHOD OF fu/*
EROSION CONTROL /
C. LANDSCAPE LIGHTING: If exterior lighting is proposed, please
show the number of fixtures and locations on a separate Iighting p1an. Identify each fixture from the lighting plan
on the list below and provide the wattage, height above grade and type of light proposed.
OTHER LANDSCAPE FEATURES (retaining walIs, fences, swimming pooIs, etc.) Please specify. Indicate heights of retaining wal-1s. Maximum height of wal-ls within the front setback is 3 feet. Maximum height of wal-Is elsewhere on the property is 6 feet.
D.
Por-e .' No C***ets n Be k,+-o d
L]TY
{SUBDIVIS]ON
JOB NAME
/i,rrir,,-7tV,., '
' fid'dtfzn't LOT
^ ./) ./ t _-.ADDRESS .Tl h 6o LE C,ae/e Uar c (b '
The location and availabj-1ity of utilities, whether they be main
trunk fines or proposed 1ines, must be approved and verified by
the fol-l-owing utilities for the accompanying site pIan.
Authorized Siqnature Date
U.S. West Communications
r-8Q0-922-r98'7
468-6860 or 949-4530
Public Service ComPanY
949-5781
Gary HaIl
Holy Cross Electric Assoc.
9 49-5892
Ted Husky/MichaeI Laverty
Heritage Cablevision T.V.
94 9-5530
Steve Hi-att
Upper Eagfe Valley Water
& Sanitation District *
416-1480
Fred Hasfee
NOTE: 1.This form is to verify service availability and
location. This should be used in conjunction with
preparing a utility plan and scheduling
install-ations.
For any new constructi-on proposalr the applj-cant
must provide a completed utility verification
form.
If a utility company has concerns with the
proposed construction' the utility representative
shoula note directly on the utility verification
form that there is a problem which needs to be
resofved. If the issue is rel-atively compli-cated,
rc shoufd be spelled out in detail in an attached
letter to the Town of Vail ' However, please keep
in mind that it is the responsibility of the
utillty company and owner to resolve identified
Problems.
4. If the utility verification form has signatures
from each of the utilj-ty companies, and no
comments are made directly on the form, the Town
will presume that there are no problems and that
the development can Proceed.
5. These verifications do not relieve the contractor
of his responsibility to obtain a street cut
permit from the Town of VaiI, Department of Public
Works and to obtain utilitv locations before
diqqinq in any public right-of-way. or easement in
Ehe Town of Vail. A buildinq permit is not a
street cut permil. A street cut permit must be
obtained seParatelY.
* Please bring a site plan, floor pJ-an, and efevations when
obtaining Upper Eagle VaIley Water & Sanitation signatures. Fire
flow needs must be addressed.
FILING
ZONE CHECK
FOR
SFR, R, R P/S ZONE D]STRICTS T
/t DArE:4/q/t+//
LEGAL DESCRIPTION: LOt
Pf I Block €. ririrrs
Ce.ADDRESS: S/6oP C.>P la).
owNER Bo*or*./k i /tirsrrt PHoNE 4ze- 7{7?
tJo Ct+r.y6,PROPOSED USE
**Lor srzE C l.ql b
lJo cHANees n Ba l44D€f*t Tt(e FozzoqJiPe
Height
Total GRFA
Allowed
(30) (33)
Existinq Proposed Total
Primary GRFA
Qannnrlarrr CRE'A
_l v^ \L ..
Setbacks Front
Sides
Rear
water Course Setback
Qi to r-nrrorarra
T.r nrl q n:n i nrr
Retaining Wal1 Heights
Parking
f]. r2.ra Crorl i f vsr vYv
Dri-ve :
+425=
+425=
20t
15'
15'
(30) (s0)
/
3' /6'
Reqrd
(300) (600) (900) (1200)
Permitted SJ-ope _1pL
Date approved by Town
Actual Slope
Engineer:
View Corridor Encroachment: Yes
Envi ronment a I,/Haz ards : 1)
2't
3)
No
! _L OOO Hta]-n
Percent Slope
Geoloqic Hazards
a) Snow Avalanche
b) RockfaII
c) Debris Flow
wetlands
Previous conditions of approval (check property fiLe):
Does this requesl invol-ve a 250 Addition? fto t /_How much of the allowed 250 Addition is used with this request? u/h
**Note: Under Sections 18.12.090 (B) and 18.13.080 (B) of the Municipal
Code, Iots zoned Two Family and Primary/Secondary which are less than
15,000 sq. ft. in area may not construct a second dwelling unit. The
Community Development Department may granL an exception to this
restriction provided the applicant meets the criteria set forth under
sections 18.12.090 (B) and 18.13.080 (B) of the Municipal code including
permanently restricting the unit as a long-term rental unit for ful1-
time employees of the Upper Eagle Va1ley.
10
E -I
o
m lq I-o l-h 8 t<x f t! >l I lm: 6 f6a=lix .+lri g lmP o l^r in o t<+5 l+m=l-rlt
T=
o<
dE ;g i;o FE 16
md o 'n
m
-.{
utl
\o
n
H
I-rn
Fnn
fifl8
z==
eE"',o o z a {n c c){o z T ltt 7
={
xn
3P
z=
\2
o6)z
ez tq mil
lr IH lzo
19Y l-<txo t-n
.r|
6q "=
H=\o \Oi r-O
@ m x m
i
o z
L
@ 2 i
m
,z
b z \.J T'
C)(n
N)
@
Zar
n
3 m
'i
z
z
--.t
-t
Oa
-..t c 3=
12 e6)
z
--{
-t
o 2,
nz >m
--{ >or-
.f
=m
--t
(-
z
m
-"{
tD t-
t:
fl |-z
H
!.1
tm lz l-
ltd
€n F
rJ)
z
i:rt
H
r F
z
<P >t>
=l<>F
Y trd fit>qt lz t tr-l
r5lZ FJ ur i€\o iH IF 6) lu)
Flz rnl
I a)l
r-r I c)l FI r{l
I
c) r-mm 6A o>'t-
Hie ,lz
lo
II t>
ta
tm
to
lz
le
I
I
I
H
l€lz +'lo
:J: l-n Ylf l$lF t\)l-
rvl[ly lz
le
I l*l\0 lf l-
I
l-{to
l€
lz to
l'n t<t>
IF t,lm
lo
l-r ,o
l€
lz lo
l-n t<t>
lF l!lm
le,lz lo
l3 l€
lz lo
t:t>l-l,tm
le,lz
=ar o -#E3a ' olt d
JAF€:R iiP 6iP)i
=.-< Q {o{ E o
= =
d*e'
o =re "
=-.o It ca+-
h:5E
^. lio o
R9d.d
3aF i (og+o
*O i( or o*=E
-! or!
d,3-
=
F
;'a !.3'
5s3"1
!gis isgP @3sL
=o)o-: =< =E;a=
E=;q <O-r
0:a E o'
:JCi
*H*a
:tiqE ):r,,o=.,x.d I 6
o
s.o
€
ct
o t
=
5
=
=(o
o
f
o
o
a
o
at
s
'_1 o
€
=
q)q
o
J o
o
=o z
f-
!
m
=d
z
m m t-l
m
l2
12 l-i
t>1-
m a x z
-
_l z o
:a
c
X X X P(
z (t c t-
l
z
-t
=o
z
m
c
m
I
tr o I
-1
2
-t
I
z
-5 m !-
m
o {
r
=z
c
=-l
o
I
z c z
-r
z m {
{m
-l
z
x 5
.r=
z
:
m
J
m
c
n
--l
z
rnl FI HI
Frl rdl
HI trjl
;l
ol t,I r!l
NI zl HI zl 'l HI zl ol t4l FI 'l FI zl
"l
I
ONF
=o<
P io
=zct iiiqo c)<2 AC'(,!" I !
^z
c k z9 - J
-rzz {
x
n<
=
N
H
t-l z
U)
P
!r
F
X
K
-
!
P l)
-i
-|
F
I
l.J
,dl ftll
EI
of;r:lz
32
r-tlF
aP frz
Sz *.c
i?n EU
HI FI rql ..,I
I HI
'il Etl HI tl
I HI zl v)l rdl
t{l
HI H.
z,
z
z
z 6 i
".1
o
tn
CD
l-
z
_n
'Yt
o
l-
o
m
E z
U'
z rll x
r{'
cJ
lv \l
\o \0
-.1 o
I
t-T m I
=
='Tl
m m
U)
a
m
+
.ll
z
m .o
q
m
z
m
m {
m
m
=z
''l
fn m
=m o I
z
t-
t-c 3 g z
m
m {
5
|-
|-
z
m
l
z
m
=
=
!m n
=_Tl
m m
aJl
VALUATION
!m a
=z I
I
ll
l(II
=m
z
t-
=2
m t-m c)
5
l-
t-
2
l\)
ul o
Erl
an
d P
H
H
{
H
,N#
PERMIT
DATE
OJECT
CTION REQUEST
TOWN OF VAIL
479-2138
/ct'.t.JOB NAME
.--"\
MOr,t
CALLER
TUES WED THUR FRI AM PM
NUMBER OF
INSPECTION:READY FOR
LOCATION:
BUILDING:
N FOOTINGS / STEEL
PLUMBING:
D UNDERGROUND
tr FOUNDATION / STEEL O ROUGH / D.W.V.
tr ROUGH / WATER O FRAMING
r-1 ROOF & SHEER " PLYWOOD NAILING O GAS PIPING
D INSULATION tr POOL / H. TUB
tr SHEETBOCK NAIL
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
O EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr FINAL
PROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REOUIRED
lNsPEcroR (')*, ,--DATE
o
box 100
vail, colorado 81657
(303) 476-s613
office of the town manager
September 22, L977
Frank Rogers
Box 276 Vaif, Colorado 81657
Re:Lot 7, Block 2, Bighorn 5th
Additlon
Dear Sir:
As a representative of the Torvn of Vail, Department of
Courmunity Development, I woul-d like to express my congratulations
to you for the fine building you recently constructed on the
above naned property. I feel that your home is a welcome
additlon to Vait and on behalf of the Department of Community
Development, would like to express my appreciation for your
efforts.
In ord.er to receive a Certificate of Occupancy (the official
document that permits you to occupy your premises) it is necessary
that the exterior be completed in accordance with plans approved
by the Design Review Board and that a final inspection be
conducted and approved to assure compliance with Town of Vail
Bullding Codes. It j-s also necessary that a culvert be installed
under your driveway to permit drainage to pass beneath your
driveway.
If it proves imposslble to have this work done in the near
future, the Torvn of Vail can issue you a Temporary Certificate
of Occupancy upon you agreeing to have tbis work done prior to a
.mutua1ly agreed date in the future.
Sin rely,
ARTMENT OF
ITY DSVEL / //. 4
Bill Pierce
Building Official
BP/dl
.ir|ri!rt !:;:iir I,rt r.: ::. ;ri.:f,. . ;l ,..1 :-l . /i
o
.a fr 1r'lj ,i.,r,;!n-,,r'r.ntr,/ii . , r i r:: , , rf i | /. , ! ss,!-ir lirr,' , i;1 i.ii
rNsr=.il|o* , FrEBUEsir
TOWN OF VAIL
DATE
TIME
JOB NAME
RECEIVED- AM PM CALLER
E orHen
MON
COMMENTS:
TUE
E pnnrrnu LOCATION
READY FOR INSPECTION
WED THUR FRI-AM PM
E eppRovED
n upor'r rHE FoLlowrNG
CORRECTIONS
n orsappRovED
GORRECTIONS:
fl nerNsPEcr
DATE r-l
I ..,^^i.^+^h i ! - lNsPEcToR j , - tNsPEcToR
I 1 tl i,l
o
PLUMEilNGi./MECHANtCAL
TOWN OF VAIL
o
PEFIMIT
PHONEY-JT \ -
E OF BUILDING:
LASS oF woRK: *{ew ! lootnoru ! neruooel fl neparn
RIPTION OF WORK:
PLUMBfNG: NUMBER 14 f MECHANICAL: NUMBER
vALUArloN s 4ltlh VALUATION $'I
.i t ,
REMARKS: /z{ ,/t f fUt*t REMARKS:
PERMIT ,rr{,40 /)r)PERMIT FEE
Mt*r-
! orsnppnoveo
rNseecrl|.ru E|EEUEST
VAIL
DATE
TIME RECEIVED- AM PM
n orHen
TOWN OF
JOB NAME
CALLER
TUE
E pnnrrll LocATroN
READY FOR INSPECTION
WED THUR PM FR MON
COMMENTS:
flappRovED
E uporrr rHE FoLLowrNG coRRECTIoNS:
CORRECTIONS
I orsnppRovED D nerNsPEcr
DATE
INSPECTOR
/:;J €ct#ot ,,', / .'.','-,,,
,/".'/ ,( Lt 1.i (-:t / ]- //' '-' ''lNsi
i,' ,'DATE JOB NAME ,f.-
TIME RECEIVED- AM PM CALLEF
'FIEOUEST
,' TOWN O F VAIL
E orsen n panrrnu LOCATION
READY FOR INSPECTION
WED THUR MON
COMMENTS:
TUE FRI AM PM
APPROVED n OtSAppROVED
fl uporu THE FoLLowrNG coRRECTToNS:
I nerNsPEcr
CORRECTIONS
DATE
INSPECTOR
-o I F (,3 E F o
-o ('
t{
E o
E o ?
-o
o t{F o o a
ld
0 F
I
=E o lr
I rI
-F
s
.t.*x
i
i
N
i o)
;
i
ll
\./:
i
\\
;
i
i (\
rN \ l1
\
i
c
6 (t
c)
I
\r\i Ut r\'v
l;-lr I
N
,N I
.-.11"t \\\\K
i
lA:!I
ft4
IN rt\i N ($
N
a)
(5 z
T{(a a2
\F z9
t'r H ()U)zz
>4
<E ('la QA pr(
*o
SH
v2
o E
&
E a
A
o
s-s-
\\
@eG
@ o)c\l
Fr
=tr != frl
Soi trFl o<
P lr{
=rt -vF FF a r-1 -t ,!5
o I &
i
o +|6
tro
j56
_q59(l)or2E.9_iD z' S: B; 2 bE fi 3 g .:.iEgtr 9tFa '-ohl/l
q
(E L
o
o ()
trl
rNsPEcGru REeuEsr o
DATE
TIME RECEIVED- AM PM CALLER
! ornen
MON
COMMENTS:
TUE
D pnnrtnl LocATroN
READY FOR INSPECTION
WED THUR FR PM
E app RovED E orsnppRovED ! nerNsPEcr
D uporrr rHE FoLLowrNG coRRECTToNS:
CORRECTIONS
I DATE
-
,1 " INSPECTOR t'q
q
I
2 o t l-o 3 E F o
-o
C'
(,
-r-E 3 o
bl
E o
-o
a
td F o o I
ld .E
I
=E o lr
i
r., ti
t,Lii*
:
;-
N
i
t:t,'\i \/i
N\'\
li
\i
1ll \:v
vi
^-ri \ti
tr
q
I
i
t\l
)+l \l
,l,.i
,ti ll :l||i\\
^i|t{I \FI \q
,r\V
rit \t\
X n\s(
:
(\t z
I{ UI az tro
OF z t),
raE ()ut 2Z
>4
<tr (aa
Ei lrl 7g
*ol
SH
.h
o g
Ei I
9o
F9
o I
,t i ui
\
N}\\
i c,
r-a c\l
ri
d
q
d
q)q)
(g
F
c E.9 \J +J EiEl OI 2Ffi zSIEF
5 ,E'! E E
ah '= q)EiifiE
H
E tt -S0.
cl-'{ Fl o<
EE H8
frl 't
frl
GI
'.
F x
c
()
lJo'-; igrr llcv ic'r+ | cr:
U
'l /fu4.-r-t/r/
/o//0* ,Rea r ao *
ta/Rea r
-_a zor.t I t,l0 Lrlt[0KL t:, r
S U Mi\4A RY Dale Paid
PROJ ECT ITECT
LEGAL DESCR IPT I
usE zor,rE 5F K ; PRoPosED UsE ( s )
SETBACKS: Required - Front c/a , Sides
O, K,
LOT S IZE 41,q16 ; FROI{TAGE
Actua I Front
INGS:
ffi-
D ISTANCE
HE I GHT:
G.R.F.A.
COMMERC I
BET14EEN BU I LD
Ave rage Gra de
---: . o(9 Raf
AL FLOOR AREA:
,o.,, Allowa
lPercentag
Actua I sq
A l lowab I
A I lowab le sq. ft
BU I LD ING BULK CONTROL
Actua
USEABLE OPEN SPACE:
LANDSCAP ING:
D i agona I
D iagona I
Date Chai rman, Design Review Board
Da te
Mayor Da te
; ARCH
Reo u i ,ed ltJ a-4&k4., Actua I
Height Allowed , Actua I ---,
b le sq . tt. 5'f', Actua I sq. (t.-E&!_i
e max imum length .--
Requi red 0f f sets Actua I length
SITE COVERAGE: Allowabte 2f%, Allowable Sq. tr. f'V?? , Actual
,of 14 oo o
t/ dv-'ft., Actual 0.f\'sq. ft.,
%, Common d
Requirua 6o fi, 4l?7 tt. ft', Actual c. {t
-'
'l '
pARKlNc AND LOADING: No. Required ---g1-, No. Actua I L/ , Covered Re-
qui red No,; Cove re d Actua I
ZON ING APPROVAL
DES IGN REV IEl,,'l BOARD APPROVAL
UTILITIES APPROVAL
ENV IRONMENTAL IMPACT APPROVAL
I sq. tt
Required 600 sq
Ground Le ve I
e affowable
-t . ft. --
Zon ing dm in istrator
Date Subrni
Dal'e S ubm i
Date S ubm i
Extens ion
by Section
ng Rev iew
gn Re v iew
ronmenta I
tte d
tted
tte d
of'
for
f o r
for
Zon i
ues I
Envi
Dea d I i ne
Dead I ine
Da te
Da te
I mpact Review
to
Dead I ine
item
of 0rd lnance No
date
B (Series of 1973)
C0MMENTS I
as permi tted
i 2s;. E'
o
4,7 //dx J1'2-
/f ,r X Af ,3-
UX /7
(o xa)/z- =,/
z/+
aaArl
/b x q,{
t5r
J15-,7c
&3/'a a
/8,a4
/t- 1
1 '7-
J3 ai. -r a
INSFECfrN
TOWN OF
' =' -::'',i
. FIEBUEsiT
VAIL
..
o'
DATE JOB NAME
TIME RECEIVED- AM PM CALLER
I orHen E pnnrrnl.LOCATION
READY FOR INSPECTION
WED THUR
,t-tf
MON
COMMENTS:
TUE FRI AM PM
E nppRovED ! orsaerRovED E nerNsPEcr
fl uporv rHE FoLLowrNG coRRECTToNS:
CORRECTIONS
DATE
.n
DATE JOB NAME
INSPECIG'N HEEUESiT
TOWN OF VAIL
TIME RECEIVED- AM PM CALLER
E oruen
MON
COMMENTS:
! pnRrrnl. LocATloN
TUE
1
READY FOR INSPECTION
WED THUR FRI-AM PM
E nppRovED I orsnpp RovE D fl nerNsPEcr
D UPOI'I THE FOLLOWING CORRECTIONS:
CORRECTIONS
DATE
INSPECTOR
D
m
n
t-
D {
z
m
n
z
-{
=z
=
-
l<\
;
N
o o
D z o
o
OD
z^
NN
l'6)|:A
fi
f
m
o
{
z
n
=
x
-
-t
t-x
\
I t-
3
P -
m
'tl
o
ll!
n |-
m
2
1t J
3
m
;-
z
b
1t ,
s z
c
=
z I
11 o
-.t
;
m
o 'i
I
2 o
--{fi
D
z
-{
z
|n
o
z
o m
D
z
i
z
m
€m i
-{
z
i m
n
m
vl
z
^t-
m
ut !
m I
f
m I
@
-
=d
m
{
z
il I
n n
:r
t-
-
o
5 n
{
7
z
T
D z
o I
dr o
n n
|n
et
==
et -rl
D
|.
E
g
t-I
z
o
U
m !
3
-{
\
D -n T
m
'n -
m
D
o
m
m 3
rn z
;z o fi
c z
o
m
{>
F(,
o
vF <F 7F o o'l 3>
=z zo
Lz
FiF
FI
z7 U-o qo
>;qtr F'<
!
!o
:
z
|n
3
\
I
:),N ri
l.
d
F'
z
c
z
E z
€
il :
z
I
I a
I Soit Tesrins
I !::r"T;:;
Moferiqls t .-:",':"
Botch De3ign
I Aspholr Mix
Dc s ign
t Geotosic
Inl.rpr.lolion
t 1T;.1;iJ;'
T
T
I
I
I
I
T
t
T
T
George D. Morris, Pl.1000 W. Fi llmore
Colorodo Springr, Cglorodo
303 -6 32-3593
sulalttcdt
RE TIIIIISC IAB.
by
R6g i5t6rcd
Professionol
Co lorodo
Spr i n gs,
Colorodo
Pueblo,
Colorqdo
RallnctfullY
I,IrcOUT.I
Ensineers
Geologisrs
GSlr/ctn
tDlL, iIOb tro.13506, 6g-261 I *";r.:J,l;"'
I
Ghnwood Sprinsr
M0ntr0!r
Gunniron,
Colorrdo
THE LINCOLN-DeVORE TESTINC LABORATORY
MEMBER: A. S.T.M.
A.5. C. E.
cEc
ACI
ilunc 18, 1975
!tr. trranh Bogcrg
lo:c 40
A\ronr Colorado 81620
Dear !ir. Rogrrsl
franrnlttod bcrcnlth tr tlre rGltort
colc.rnlng thr rubeurftcc tollr lnvcrtlgetl.on nadc rt f Pro-
polad rcrid€nthl tltG on lot ?, SIoGk 2r BLglprn subdlvltiont
stb rddttLoa near vall, Colorado.
t,
I
MEMBER: A. S.T.M.
r A. S. C. E.
I CEC I Acl
THE LINCOLN-DeVORE TESTING LABORATORY
George D. Morris, FE.
sttBsuRlrcB solls nWESTICA"IOI
wE 7, BrOeX 2, Bremnt suBDxvlSrotr
vtrl,, coxoRam
1000 W. Fillmore
Colorodo Sprin gr, Colorodo
303-632- 3593
T
I soit restins
I E::Lj.ll:;
Mot.riolg
t
resrs
Con crele
I ':."::
Des i gn
I Gootosic
I nl6rpretotion
I liT.ii."l;'
lbv
Registered
I '!'i;;"i:l:'
Gcologi sls
| '*f;;i:
Colorsdo
I Puebro,
Colorodo
I Rocl sprinss.
rYY0mrIg
I
ctrnwood sprins!
Mon t 1o tr
I ::ilil:
T
I
I
I
I
I
I
t
T
I
I
t
T
I
t
t
I
t
t
I
t
llETf,lETr
Thr oontiat ol thla rtDort 1l a foqndatLon
rad rl.tc ttody f,or r proportd rerldrntlal rtrueturc to ba phord ln
thc llghorn Subdlvtr!.o1, rart of, vrll, Colorrdo. lfhc ltrueturc Ir
to be t tro-ttory bulldLng coartruetrd slth r eravl rlrtc., rtcc.Ft
for a grrago whtoh 1r locttsd b.!.rth thc rrcldcnoc. FootlnE lcvrl
1111 bc at a dopth of asryroxlmtcly 1-L/2 to 3 f,ert.
Alter eoaal.drntlon o! thc Lnvrrtlgatton
rnd totlnf, Drogran dcacrlbad hercln, lt Lr our t.comcndltlon that
a rballor f,oundatlon ayeton eoulrt,hg of oontl,nuour url.l f,ootlaEl
brnceth burlng rallt aadl tyo lrolettd lootlngt bcncath Golunn loca-
tLonr be urcd to crrry thc wrl.ght of, thr proporcd ltructuro. lt th.
d.Dth o! 5 fc.t, foottagr sbuld be proportl.oncd on thc barlr of rn
allourblo bcerlng celneity of 4000 prf for crtcrlor rellr end 3800 psf
tos lat.rlor ralb. loundatloa pr.rrur., rbould bc balanccd to
ulthln about 50O pr! rt ell polntt b.noath th. proDorcd atructurc.
lo nlnlnun dcad lordt rlll bc ruqulrtd on tblr tltc.
toundrtloa salk rhould be eonrtruetrd rr
grrdr baruf calnblc of rpatrnla6 a dlrtancr of, rbout I fcrt. Eueh
concrrto gtrado branr rhould bc contlauoutly nlnforecd around thr
butldtag ultb no grpf or bnehr u!l.r! tb.y rs. tpralelly dolgned.
n.hforah0 alpuld br trlrcrd both atrr th. top rld n rt th. botta,
rlth thc neJor ralnlorchg n.rr th. botts. It thr ftfr urlh arr to
be oonrtrustod of ooncr.tc bloot, thr foottry tbuld br nLnlorccd
borlroatally. lfh. coDcntr blook rhould br rclnlorerd wrtlcally vlth
,bm *l brr at t4-lach ocntcrr, u a nlllnn.
-1-
I
I
T
I
I
I
I
I
T
t
I
I
T
I
I
I
T
I
I
o tng lr Stacr thr bstld tlolgard rr e srayl
rlrroo typr of, rtructurc, thc mJor rrgulrmrntr for thlr rtrueturc
rould ooaeLrt ln rtrbdralnrgo ol thr rltc l! lnrrlblr lad eovcriag thr
enwl rpacc enr ebovc tba rubdraln to rrducc thr hrntdlty under thr
butldtng, A grsrg; ll plrnaod under thc etrusturc. Tho lootlrrgr
w111 br at r dcpth ot 4-L/2 to 5 f,crt, wlrleh Lr vtry nrerly rt the
wttea tablr on thG sl.tc. Thc geragr floor rhb on gradc wlll bc kcpt
trtorat.d uahgr lt lr protccted by a layer of aolrrr gnvct benoatb
and a vapor barrlcr abovc thr gravel.
turth.r neomcndetloar conaarnlry thr
conctruetloa of thc bulldlng uc Atvcn ta tbc bodly of tbk rolrrt.
all recomcndrtlone arl rubJtct to tbr llnttetlonc l.t f,orth hcrcLn.
-t-
I
I
t
I
I
T
t
I
I
I
T
T
T
I
T
I
t
I
T
9ElEBl!t
t'ho purlnrc of thir Lnvcrtigatlotr n|
to dotcrnlnr thr ruLtabLllty of thc rltc f,or @!rt!atlo$ o! a rrle-
tlvcly tlghturtgbt nrldentlel etructure. Spctftc Ehareotrrlltler
o! thc lndlvlduel tollr lound ta thr tcrt borlry. fl.r. detrnlnrd lor
uro in dlarl,gElng thc touadatlons for thr ctructurr.
'lfho tlto 1r loEettd on trpt ? ln Eloch 2
of ltghorn Subdlvleloap 3th lddltlon. Thte tr locatod tn thc Elgborn
troa rart of vall, bctscrn U.8. Elghray 6 and €orc Crach. Iha
tolngnep!ry of, thc rltr 1r rrletlvcly hvcl. [hr Oorr Grerk tru Ll
t Drrtoil f,lrt vrLlcy lylry bctnGn tro vcry rtcop muntalar DGrr th.
uartrrn barr of rflil parr. DLrrctlon of dralnagr nrrlcr rouobat
around tbc altr, rlacc tlre botton of tbc vallcy lr not pufrctly lcvcl.
In gcaerrlr dreinagc lc tomrd tha lorthrert cvontuatly cntrrlng G,orc
€rrsk. Surf,acr dralnrEc Lr falrr rubrurlacc dralnego Lr Eood.
lhr eubrurtro. rol,le on th. rltc conrfut
of alluvlun, r.Tortod rad dloprttrd by gorG er..h. Itrk alluvlun
booourc colrsGr gralnod aad drarer vltb gr.rt.r drpth. lppro:rlnetcly
L-L/Z feot o! orgenlo uetrrlrl wer found et thr rurf,rqr of thc ground.
Imrdlrtrly bclow tblr, r lay.r crtrndltrg to r d.pth of about 6 l..t
rer fosrd to corulrt baeieally ot a rrlatlvrly tlnr gnrlnrd rllty itnd.
Itc gra{n rLrc of tblr lrtcrlrl ErrdurUf l|lercercr rtd tb. rotl be-
coa.. a rrll Eraded rtlty land contrtalag atsorour eobblo btlc r
drpth of 6 fmt. ttr drnrlty ol tht lrtrrirl Lr rchtlvrly hl,gD and
tU of thr roll lr rtrblo.
-3-
t
t
I
T
T
I
T
T
I
I
I
t
t
T
t
I
T
T
t
tl v Tru. htrd, drnrc brdroct rer not fouad
ln rltbrr o! tho tort pltr dug oa thr eltr. lLrhc alluvlun tr knorn
to bo rtlrtluoly dacp et thtr polnt rad, ia rsy .v.[t, tbo foundrtlolr
of tha ptopor.d rtruetur. wlll br hlgh cnough rbovc thc bodroct that
tt vtll hrv. Uttl. .ff.st o! thc proporoit bulldlag.
-a-
I
I
I
I
I
I
I
I
I
I
I
t
I
I
I
t
T
t
I
o a t x)Blmq- I4$lrlpnE E!8IB & RlSIt!!8r
Eto trrt pltr r.r. dug oa thr eltc rr
rh6na oD th. attachrd Tfit Flt lloeetton Dligrau. ,lfhcrc rere placcd
at rgproxturt.ly oppottta Dortlons of thr butldlng ln an elfort to
obtaln r r.aronbly good rubeurf,acc profllc o! tho rolle bcnrath thc
rl.tc. fltbough rme 61ff,afc&e.r rcrr notodr Drrtlaularly ln thc dopth
ol the varlour rolb found, thr grnerel protllo wm ruf,flctently
rlallar terotr thc rl,to tbrt no furthrr tart pltr wrrc dnncd neceerlry.
lho plta s.r. cxcrvetcd alryroxluatcl.y 10 fo6t by 3 fcct ln dluraalon
to thc drpth trot.d on thc loge. tll pttr rrro dug rlth r poircr-
drlvro beskhoc. Srnplca worc trkrn brfr bulk urthodr.
tlfrc rrJor sotl typcr uorG found oa thc
llte. 'rhccc are botb etlty saldr end uc part ol thc alluvtun dcDorlteil
aad rspgrtcdl by Goro Crsek. lfhc uppcr L-L/z f,.rt of, tlro prolllc
conrktr of orgenle saudr rhlch rhouLd not bo urGd benmth rny rtruc-
tural prtloa of thc bulldtng. Blrrcc orgaalc randr uc rclatlvcly
thla, lloncvor, end caa b: carlly p€notrrtcit by tbr foundatlonr. ?he
goll tncdLetcly brncath thts and Gxtcndhg to aa rvcrrgc dopth o!
about 5 f6at 1r r nrdlun to flne grrltr.d rllty raal yhlch wat found
to bc rclatlvoly frec tron thc pr.ranca ol eobblre or Lrrgrr rootr.
ttr!.r natrrlrl fu dranr and rolatlvcly atrbh. lclar a dlepth of about
6 tmt, thr roll chrngo to a rl!,ghtly corrtcr gralncd rend. Iblt
lrycr of [.t.sl,rl contrlnr r conr!.dcnblr nurb.r o! nrll sobbhl aad
rock. lllrh nrtcrlrl rar found to ba qultr dcarr aEd rcll b.dd.l.
lr lr tXplcatr of, alluvlrl netorlrlr, both of th. laytrr err quttr
rtrattrflrd rnd esnteln nuocrour thln lrnru ol both corr.. trata.d
-t-
I
T
T
I
I
t
t
t
I
t
I
I
I
I
I
I
I
T
I
I rld v.tIt llno gttl,nrd uaterlrlr. llorc pr rnglarrl.ng ahrrr6t.!-
lrtlss of, oach of thur tro roll typrr oan br fonnd on tb. rttaehed
rueuy rhretr. fh. follorylry dfucurrloa lr Dor. gen.rel ln nrtur..
Soll .llylrG fo. I 1l a ellty arnd of nedlun
to flno graLn tL!.. llhls natcrLrl 1g aon-plartlc, of ncdlun psrur..
eblllty and genrrally of hlgh denrlty. rt haa no tcndondy to erlnnd
ulna thc addltlon of nokturr and no trndanay to trur long t.rD coD-
rolldatl.on. ttlr roil u111 tcttlc lf tt li ovcrloedrd, but lf tbc
rllomblo boarLng vllue ls not cxcccdrd, rottlcncnt rrtll bc nlnLnar.
tha bcerlng vrluc of, thLr latcrtrl varlrd con€$het r€ross thr rLte,
but eg eetlneted by aheerl,nE tcrte radr on thr solt war found to bc
ilOOO prf, nrrLtun. f,o uLnLnm boertnq valuc rL1l be raqulrcd. Thlr
roLl doce not oontaln eulfatca ln dctrinental guantltier.
8ot1 E1lpo tro. 2 Ir e well gradcd rtlty
rend of soa!!. ts nrdlun graln rLro. Ehir naterlal rrgo conteLna
rone cobbrcc :nd sEsrl rocks. Thlr nrtcrLal tr qulta rLnl.lar to soll
'fl6a tro. 1,, rxcept for the dlffercnee l,n graln lLEo, xt Lr non-
plartlc, of htgb parneabtllty and gcncrally o! htgh dcnalty. It
ha6 no t.tdancy to axlnnd ultoD tha addltlon of nol:turo and no tcndrncy
to truc lorE tan coagolldrtlcn. lrrr rgrln, rtttlncnt can teke
plroc tf tb. roll Lr ovarloedrdl but undor th. Drepoeod lordlryt
rttlcnsat rhould be nlnlarl. Tbc bcarlng vlluo ol thlr aat*tal
rnr ctttat.d by rh.rr trrts end rrr found to br 5000 1rl narlnur
r,t r d.pth of tbout 7 to I fect, ,|rhtr ro11 docr not oontrL! sulf,ator
ln dotrlnontal quantltl.ar.
I fr.. rater tebh rar fouad at a dtptb
of 6 lret ln lb.t Flt lo. r rld t f..t l! !..t plt Io. l. tta
I rolro
-6-
I
I
I
I
I
I
I
I
I
I
I
I
I
I
T
I
I
I
t
o
dcpth
I
t.t dlftsrrner Ln to thr trcr satu trblr l.etr the dlffoa.rc.
ia thr rurf,rer of, th. gfouad mtb.r thru rny laJor ohragr ln tht
Icvcl of thr ret.r trblo. ttr dcpth of, thc ntlr tablt epptrrc to
bc roletlvcly unifon ovlt thi cntlrc rltc and due to ltr proxlnl.ty
to Oorr Crtrk lurt bc rrrulld to bo r contLnuour lcature of thr cLtr.
In gcncral, tbo roilr on tho rLtr aro of, rufflaieatly corrrc gra!.n
and arc ruf,fLalcatly drnrc thAt thc proronc. of tha frer vater trblG
door not rf,loct th. b.rrlng valuo to itry gr.at degrce. It dorr havc
romc cffact, horcvrr, anrd thc bcrrlng valuu glvon for crch of tbc
ro11 tylnr rcfhstr the nlnor affcct of thr frc ntcr trblc on thc
rLtr. lbls frca wrtar tabh 1r aonaretcd rlth thc rubllor of thc
cro.k rnd thr lavrl stll rlrc at ccrtaln tlnar of th. yrar. tluctu-
atlonr of tblr tlpc wtll not af,fcct the proporcd rtructuro ro long
ar thc bcarlng valuec A!.ven ln thtc rrport are not sxoodcd and go
long rr tbr crawl sllecc rurlacr aad the f,loor rleb on grade Ln thr
grnta tra protGetod ftol rush novcoGnt. Somc drrlnrgc lrrccrutlonr
erc Atvrn ln thtr rclprt to rwld eddlng ror. wtt.r to tbc lrco rttor
trbl. lror thc aurfacr of thr ground aad to hclp prot.ct thc coa€rct.
rlab lror thc rlec Ln rubsurtlcc xttcr teblrr.
-?-
t
t
t
I
t
t
T
I
I
I
t
I
I
T
T
I
t
T
t
o
CO|ICLITBIOE & ll@l0rilDtlllOll8 r
|!hc prolnacd rtruoturc lr r franc rcrtd.nsr
eoarletluE of, two stortec and e tnall loft at a thlrd lcvcl. lhe
plana tndlleate that, gcncrally, thc butldllng w111 be conttructed wlth
a crarl rlladG, wlth tho creeptLon of a,garage u6a crtcndlng bcncrth
tho honar. hcG1rt for thc foundatl,on rallg, thc rtrueture 1. lrinc
and rlll gcncnlly br of ltght welEht. toadlngc wlthtn thc bulldlng
ara rathcr varleblc duc to the bcan franlng of the gecond floor and
loft. gpot chrckr Lndleatc that tlrc unlf,orn loadlng rlong tho foun-
datLon salLe 1111 ba otr thc ordor of 2500 to 3000 p1f on heavl.ly
lotdad walls, and fro 1200 to 18O0 plf, on llghtly lordcil ralle.
Glvrn lrdivldual ralle rltbln tho bu!.ldlng 1111 be loadtd falrly
unlfornly. Conelderable dllfcrenccs ln loedlry entst b.twcrn dllfercnt
rallc la tha bulldtng howavor.
llhc rollr on thc el.tc are all rtable and
have hl.gh bearlq vlluar. Ehcy ara [on-cxpa[eLvo and, cxcept for
rcqulrlng rome balanclaE of the foundetlon, wlll act ag good foun-
datlon collr. Thc only clrarastcrlatle found on the altc whtch would
rcgulro rlrclal dcrlqtn of e|ty tlryra rar the prcsence of thc htgh wrtcr
trblo whlch cou16 caulG hlgh huntdlty tn the crawl etrsc ar.r or
danago I tloor rlrb on grada on th. elte.
trtt.r consldoratton of, thc f,caturcg of th.
rl,te, lt wer drtrrulned that thc bcrt aad nort rqonoulcal foundrtlon
for urc braortb tho buttdtng rculd bc thrt ot coEtlnuour wall lootingr
ber.rtb brerLng yallg ad ltolatcd epread footlngn bcaeath the tr6
colunnr rhloh rrtrt lcrr the c.ntcr ol thc bulldlng. Iheac lootlagr
rhouldl br grolnrtlonrd oa thr brrlr of a naxlnun rllerebl. brerlng
-8-
I
t
t
I
T
t
T
I
I
T
I
T
I
t
t
t
I
I
I
capaclty of 400
o
f, at a depth betwaen 4-L/2 and 5 feet. It ls
further recormended that the foundatlon dcpth be earrLed to at leaet
4-L/2 feet to avoid contlnual frogt problens under the bulldlng.
The 4-L/2 foot frost depth could be obtalned by fllLlng around the
outeide of the buildlng. lhe ptans do not lndtaate thls, however,
and tha report aEeumea that the nativ€ ground level la to be ueed
as the flnaL eurface.
In addltlon to proportl.onlng the footinge
to naxLnum allowable bearing valuea, ae in the paragraph above, varL-
atlons ln the sands across the site lndieate the bullding should be
balanced eo the loads on the soil beneath the etructure are approxl-
nately the same at all points around ttre bullding. ThLs balance
should bc computed using the dead load of the bullding plua one-third
of the live 1oad. Ueing this crlterion, the footlngs ehould be
balanced so they load the soil to wlthln 500 pef at all polnts around
the sxterlor hralls of the bulIdlng. hterior foundatlons, whether
eontinuoue or lsolatod, ehould be balanced for loade of approxlurately
300 prf lees than thoae u86d around tha exterior walle to avold a
eratering effect whlch is comnon to this soil t14pe.
lfhe plan does not specify the type of
foundatlon waLL to be us.d. If thie wall ia to be of placed concrcte,
it should bo deelgnad ar r grade beam capable of elnnnlng at leaet
I fect. Thie Erade bean ehould be reinforced continuously around the
building wtth no !tap6 or breaka unlesa they are epecially deeLgned.
Rclnforelng ehould be placed both near the top and near the bottm
of the grade bean wlth the naJor rclnforctng belng at tha botton, ln
thla partlcular c!s€. lYith a eranl spacc typG structurc, vertLeal
o
opa
-9-
I
T
I
I
T
t
I
I
t
t
I
t
T
I
t
I
t
I
I
t-v'
reLnforc!.ng wlll probably not be requlred in a placed concrete wall.
If a basement type baekflll of ov6r 6 feet Ls used against any portlon
of the building, however, vertical reinforcing may be regulred to
resl-et the preesure of the soil and water. To compute the amount of
this relnforcing, the eguivalent fluid pr€asure of the soil should
be taken ae 35 pef above the free water table.
If the foundatlon stem wall 1g eonEtructed
of concrete block above a placed conerete footlng, then the deslgn
must be aomewhat dlfferent. Eorlzontal relnforclng should be plaeed
at the botton of the footlng so that the footing ltself wlll act ae
a emall grade beam etiffcned by the block wall above. The concrete
bloek wall above should be completely filled with concrete or mortar
and rclnforced with at leaet one #4 d bat verticaLly at lntervals of
24 inchee on center. In this nanner, a concrete block wall can be
made sufflciently rlgld to act ae a grade beam capable of slnnnlng
the 8 feet rcquired.
floor slabs on gradc will not regul.re
epecial dealgn for etrength. Since the floor slab on grade in the
garage area wlll be at free water level, however, j.t muet bc protacted
fron the actl-on of the water particularly lf the water level ahould
rlse. It ie recommended that thie floor sl-ab on grade be underlaln
by a rock layer. Thte eoaree rock layer should conslet of relatlvely
uniform uaterLal cagnble of actlng ae a caplllary break. Any graln
stse above 3/B-tnch would be adequate so long as the graln cLce Ie
reaaonably unlforn. A horlsontal outlet away fron the butldlng ghould
bc conltructod eo that thle rock layer wlll act aa a caplllary braak
-10-
I
I
I
T
I
I
I
I
I
I
I
I
T
T
I
t
T
I
I
rnd 1111 rot t""tt.". Abovc thlr lryerr l".rot barrLrr rhould
bc plecrd Lncllhtcly bmntb thc coner.tr tloot rlrb to prot.ot tL.
rlab fro eeplllary rl,rl o! Trt.r through thc concrrto.
t saewhat slnllar netbod of protsctlng
thc erlrl lpacc eea be accompliehed. All the organic ulterlal oD tho
tltc and ln thc erawl space erca ahouldl be removed and replaccd wlth
coatr86r graLncd eand or gravcl. lny naterlal elnllar to flpa I rould
bc adoquatc for thla purlpsc. Thir 11,11 act to cut caplllary rkc
wlthln the soll and ln thc crawl spaee, reduclng the hunldllty ln tbr
area to amc dagrec. Such a erawl :Fec6 should be covcrcd with a
telt papcr ta protact any tteur which nay be gtored ln thc arc!.
seLtbcr ol tho roll: lound on thc sltr
coateln sulfatcs ln any detrinental quantlty. For thlg retcon, $yllc
I Coiaent nay bc urcd la all consrotc ln cootact wtth ths ro11.
Thc naJor soqrco of wator problena on thlr
rlta will be the frec wlter benratb the clte rathcr thrn at the
rurface of tha ground. At tlre aane tlne, howcvcr, lt would br un-
dcslrable to ralsc the level of f,ree watcr bcneath by any Er€an! ro
tbet dralnaEe at thc aurfacc of tha ground nruet bc rccmanded to
carry r*ater away lron thc glte and not al1ow lt to lnllltrrta thr toll,
lf at alL Snsrlblc. Even thougb a alope s111 not carry of,t lrrgr-
rcale gnowurlt whllc thc snow attll a:rlatg areund tbo bulldlngp lt k
rccmcad.d that a alope of at l.a!t S for a dirtencc of apprsrlnrtrly
10 f.et aray f,ron tbc etructure be nalntalned to rcmve all trnrllblo
runof,f, 116 thc backllllcd ar.a. tro aid ln thls ruaoff to rolr degrcr
ead to povtdr ronc addltlonal lstaral ctabtllty to th6 etructulr,
brctctlll around tbe bulldllng rr*l ln uttlLty trsnchcc laadllng to tbr
-11-
I
t
I
I
t
I
I
I
I
t
t
T
t
I
I
I
I
I
I
I
T
T
I
I
I
I
I
I
I
T
T
I
T
T
I
I
I
I
butlillng ury bc cnlsctrd to et l.r.t 90* of tbr rer!.nnn Prootor
donrl.ty, l8 n D-698. llhir lt en optlonrl rrconrndrtlon elnca th.
foundrttoa wall nay bc eonrtruct.d of eoncrctc bloct and cotngnctlon
to thle dcqrac ie not poerl"ble around a block toundatlon.
fltbugh tha subaurfacc cotl protlls
apparrr to be reletLvcly unlform on thl! eltc, lt te elwayt lnsrlblo,
ln an alluvlal drporlt, for ahffiellea to oceur botwcen tclt lrltr or
borbgr. ff eny unucual aoll t1ryc wh!.ch lr rrot thonn ln thcst tott
pltr 1r found upon exctrnrtlon, tt lr rremcndcd tln Leboratory br
callcd tor an lnapeetlon of thc sitt to drtornlnc thc soll tygn end
the varlout eonditloas bsnceth tho ctructural portlon of the butldtng.
If ehr$g.t ara raqul.rcd tn ttre foundatlon detLgn, thay can be nadr
upon conplotlon of the Lne;netLon.
Tho organle aatcrlal on tbc altc le rela-
ttvely thln and can be eaelly pcnatrattd $ thc footlngr proporod.
If, for rny leaBon, to;reoll or debrir k found bencath th6 stluctura
of thc bulldlnE, lt ahould br rernovad frm thls area prlor to bcglnniag
aonrtruatlon of the foundatfo$. If natorlal le rorurovcd fronr bcnoeth
thc foundatLon, lt rhould bc rcplaeed wlth beekfl.ll eoneirtlng of
granular ntrtGrlal of c{thcr Sott qyp€t f,o. L or 2 and thlr rnatcrl l
rlrould bc conpaetd to et lcast 9fr aC narlluu Proctor dcnr!.ty, l80l
D-698.
It lr bellcvrd thtt r11 prrtlnant polnt!
conccrnl.ng tbe rubeurfaoo coLlr on thle rltc havc baen eovcred La thlr
rcport. If quaatlona arlra or lf furthcr tnfornatlon ta dcrlrr6,
plcuc frcl frca to contaet th. Ilborrtory rt arry tlnG.
-ul-
n
I
IT
t
I
I
t
I
I
I
I
I
I
t
I
I
I
I
t
t
t4tt
v
5c-.o uer-, t sat
THE LINCOLN.DCVORE TESTING LABORATORY
Colorodo Sprir,gr, Rrrbto, Glcnwood wYOl$Ne Rock Spting3 T'EsT PtT Lo.arrar,t D taqEat4
Lof ?s Qz,ctc.t< 2 , BrcuoeN SoanDtvtstotl sTAoc
I
I
I
I
T
I
I
I
I
I
I
T
I
I
I
I
t
I
I
I
I
I
I
T
I
I
t
I
T
I
I
T
I
I
I
t
I
I
SI'ITIBOLS & NCIIES
I
| 9/f2 Standard penetration drive
I ltumbers indicate 9 blows to
I drive the spoon 12" into ground.
I
f, st z-t72" shetby rhin wall
{ sample
I
\ ,u" Nhtural Moisture content
I l<t* Weathered or Decomposed Soil I --
I
-
- Free water table
lY' Natural dry density
1 t.".-Disturbed aulk Sample
l@ Soil type related to sanples
,", -,, l- in rePort
.".;I Top of formation
I
I Test Boring Location
A Seismie or Resistivity
I Station
Standard Penetration Drives are
made by driving a standard 1.4"
split spoon sampler into the
ground'by dropping a 140 Ib.
weight 30". ASTI! test des.O-1586.
Samples may be bulk, standard spli
spoon (both disturbed) or 2-L/2"
f.D. thin walI ("undisturbed")
Shelby tube samples. See log for
tYPe.
Combinations of
often used and
as SP,/SM.
these slmbols are
are labeled e.g.
SYMBOL
GW
GP
GM
GC
SW
SP
SM
sc
l,lL
OL
lilH
CH
OH
PT
DESCRTg[ION
Well graded gravel
Poorly graded gravel
Silty gravel
Clayey gravel
well graded sand
Poorly graded sand
Silty sand
Clayey sand
s ilr
Lean clay
Organic silt
Elastic silt,
Fat clay
.(ttigh Plast ic )
Organic clay
Peat
Hard formation
(any type)
Geologic symbol given
e.9. KP = Pierre Shale
LINC0LN-0eV0RE TESTING LABORATORY
C()L()RAD() SPRINGS, PUEBL(l, Ctll(]RADO-ROCK SPRINGS, WY()MING NOTES & SYMBOLS
t
I
t
I
I
I
I
I
I
t
t
t
I
T
t
I
t
I
t
To* Holc No.
fog Elcvotion
rPt rFz
roPsotL
srt
o24:attN
K4Oe6Ft
SM tt.
r.J. - 25, f7.
@
frSt t trfE
@e'
rd.
@
rE.
aJ. - zr.4o/-a
lrla.tt- , t-t r..-.
F.
sN/sM
c4) c' e a
f)cxtc
Bo.ron @ to'
t'Et e5 su./sn
D€xt.
3oaE
12,
@
IO IO
c.lttLE1
aorro*t @ /2'
l5 15
20 20
25 25
30 30
35 35
40 40
DRILLING LOGS LINCOLX-DcvORE TESTING LABORATORY
COLORADO SPRINGS-PU EBLO, COLORADO
o o
8o1l Sa4rle SM leat
Date
Teat
Ho.13 506 cs -26 t
Pro)ect L7. 82 5/24/76
8aqlle lpcatlon T.P. #1 @ 5'by MT'!'J
E o H
F
trl
&
FI z H q
z
frt (.,
lr:A
100
90
80
'to
50
50
40
30
20
10
. | ^.1 ,[f'o I I
Lrh," /4,'/2,18,, #4 #O "n "["t- ('{r9t l
#20 *HO #lm +p00 - Sleve No.
SILT TO CIAY
Nonplastlc to Plastlc
SaIlpIe No.
Spectflc Gravlty
t|'oleture content
t64
24.6%
Effectlve Slze o.o32
Cu
Cc z . J+
llnenegs ltodulue
L.L!:!_:rl' P.r.
BEARII{G 4OOO
N l_tr
p8f
Sleve Slze % Passlng
t/2,
ln
3/4:100. 0
L/2
3iB"93 .5
87. o
10
20
40
I L.Z
4A.9
35.5
lo0 2L.O
2gO L4.4
0200
0050
7.L
4.6
Sulfetea neqative pIE.
G&AIN STZE ATiIALYSIS
LINCOLN-DEVORE TESTING IABOR.ATORY
COLOR,ADO SPRTNGS, COI.oRADO
T
soll Type sM ( l)TeEt No. 13506. GS-261
Date 6/7 /76 Proj ect L7, P2, Bighorn Subd.
Sarqrle obtained T.P. #1 @ 4-6'Test bY-- IS-
2.O
U)
X
I
(4n
v>4r
El
Ei
U)
&{
lll
Utr-. )
0.5 1.0 1.5 2.o 2.5 3.
PRINCIPAL STRESS KSF
U)
I
U)a
Er
U)
Tlpe Test Direct Shear
Ct Peak-44.1o Residual-33.1o
tan 6 O.969 0.652
NCt 5.58 3-41
I
_l it'-1
L
:t l-rl Rciidir r[Tif -rr:- - l-
-
l T
I I
STRAIN - %
Dry Density-pcf
Moisture - %
LINCOLN-DeVORE TESTING I,ABORATORY
COLORADO SPRINGS. COLORADO
T
I
I
I
t
t
I
T
I
I
T
I
T
T
T
T
I
T
t
8o11 Sanple Test
Date
Test
No.13506 GS-26r
ProJect L7 B ighorn 5 /24/76
Senple Locatlon #2 8'by JRW
E
H
trl 7
f.l z
H h
E f'l U
Fl A
lo0
90
80
70
60
50
40
30
20
10
0 r00
I tl|"it tl +4 #10
bt"."f"r- tfi "l
+poo #20 #40 #1@ - Sleve No.
SILT TO CIAY
Nonolastic to Plastlc
Sample No.
Speclflc cravlty
Ualsture Content
Effectl.ve Slze 0. 05
Cu JZ, \)
Cc 2,0
Plnenese l,todulue
L.L. 16.0 6 P.r. N
BEARING 5OOO
v.__fi
pBf
Sleve Slze % Paselng
I
1"
L/2"
100. 0
3/4:94 .7
L/2 92 .3
3/8"
62. I
10
20
40
o t -+
a'1, '7
r00 16.5
200 ll-.0
0200
0050
Sulfstes negatrve ppn
GR.ATN SIZE ANALYSIS LTNEOLN-DEVORE TES'TING IABOR.,ATORY