Loading...
HomeMy WebLinkAboutBIGHORN TERRACE UNIT 22 LEGAL.pdfNOTE : THIS PERMIT MUST BE POSTED ON PROJECT TITLE: HOLM REMODEL ADD/ALT SFR BUILD PERMIT O (lnra -/tr/,fcE- JOBSITE AT ALL TIMES Permit 895-0 37 5 TOWN OFVAIL 75 South Frontage Road Vail" Colorado 81657 970-479-213V479-2139 FAX 970-479-2452 Job Address Location. . . Parcel No..Project No. APPLTCANT HOLM CONSTRUCTION 4061 BIGHORN RD., VAIL, CONTRACTOR HOLM CONSTRUCTION 4061 BIGHORN RD., VAIL, Department of Community Deve lopment 4247 COLWBINE 270t-!22-14-022 PRJ95-0230 DR Status. . . .npp1ied. . Issued... Expires. . AdditionaL Fees---------> TotaI Pernit Fee--------> Paynents----- BALANCE DUE-- ISSUED ro /20 /ree5 Lo/27 /tee5 o4 /24 /Lee 6 767 .80 .00 767 .80 767 .AO .00 co 8165? co 81657 Phonez 970-476-0384 Phone : 97 Q-47 6-0384 OWNER Description: ADDITION Fi reptace InforEation: Rest.i cted: t tffiriffi*rr*titffiffi FEE SUlltlARY Bui Ldi ng---> Ptan check--> lnvestigat ion> tli l. L caL t---> Restuarant P[an Reviev--> HOLM REMODEL WATERS JOYCE, 4472 E LAKE Cr, LITTLETON CO 80121 Number of Dwelling Units: 000 Town of Vail Adjusted Valuation: 24,000 #Of Gas Appt i ances:#Of Gas Logs:fof Uood/Pa t Iet: 265. @ 185.25 .00 3. OO .00 Totat catcutated Fees---> Recreation tee---------> Cl,ean-Up Deposit-------> TOTAL FEES_--- 50.00 114.55 1@.00 767 .80 Item: 05100 BUILDING DEPARTMENT 10/27/1995 CHUCK Action: APPR Item: 05400 PLANNING DEPARTMENT to/27/1995 CHUCK Action: APPR Item: 05600 FIRE DEPARTMENT IO/27/L995 CHUCK Acrion: APPR Item: 05500 PUBLIC WORKS LO/27/I99s cHUcK Action: APPR Dept Dept Dept Dept BUILDING Division PI-,ANNING Division FIRE Division PUB WORK Division 'r*'rltffi *ffi firJrtffi ,itt*|tffi ff *tr**fi ***ffi ffi ****tff ,.******ff *ft ff ,rffi ***ft **ffiffi ffi *ffi ffi ffi See Page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknovtedge that I have read this application, filted out in futl" the information requi red, compteted an accurate ptot ptan/ and state that att the information provided as required is correct. I agree to compLy yith the information and pl,ot ptan/ to conPty vith al.t ToHn ordinances and state [aus, and to buil,d this structure accord'ing to the Toyn, s zoning and subdivision codes, design review approved, Unifonn Buil,ding Code and other ordinances of the Town applicabte REOUESTS FOR INSPECTIONS SHALL BE I'ADE TI.IENTY-IOUR HOURS IN ADVANCE BY TELEPHONE AT Send Ctean-Up Deposit To: {g **t""o'*o OI.INER OR IOR TOR HII.ISELF ANO OI.'NER TOWN OFVAIL PAGE 2 COND I T ION S OF APPROV AlDepartment of Community D eve lopment as of Lo/27/95 Status: ISSUED **9WW9_2I3${79.2R9***:t************!e********************************************* FAX 970-479-2452 Pernit Type: ADD/ALT SFR BUILD PERMIT Applicanr: HOLM CONSTRUCTION Job Address: 4247 COLIIMBINE DR Location:Parcel No: 2101-t22-t4-022 ************:l******************************************************************* CONDITIONS ********************************************************!t*********************** 1. FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. 2. SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND EVERY STORY AS PER SEC.1210 OF THE 1991 UBC. 75 South Frontage Road Pp&friiordf:o &6570375 Applied: t0/20/L995 Issued: 1,0/27 /7995 \ |fiPu*u"'uo TOWN OFVITL THIS PERMIT MUST BE POSTED ON PLT'MBING PERMIT JOBSITE AT ALL TIMES Permit #: P95-0170 75 South Frontage Road VaiL Colorado 81657 970-479-213V479-2139 FAX 970-479-2452 APPTICANT CONTRACTOR OVINER D epartment of C ommunity Deve lopment Job Address Location. .. Parcel No.. Project No. HOI,},I CONSTRUCTION 4061 BIGHORN RD., HOLM CONSTRUCTION 4061 BTGHORN RD., HOLM REMODEL 4247 COLVMBINE DR 2LO1-L22-14-022 PRJ95-02 30 Status. . . Applied. . Issued. . . Expires. . Phone:970-4 Valuation: Totat calcutated Fees--> Additionat Fecs------> ISSUED 70 /20 /ree5 70 /27 /7es5 0 4 /24 /ree6 7 6-0384 vArL, co 81657 vArL, co 81657 Phone: 97 O-47 6-0384 Phone : 303827 57 36 CONTRACTOR JERRY SIBLEY PLUMBING P O BOX 340, MTNTURN CO 81645 Description: ADDITION **#ffit*ffr**ffi*t****#t*****ffi**ffi* FEE SUlll,lARY ffi*ffiffd**fl ***ffi 3, 5oo. oo 78.00 .o0 P Luibi ng*---> Plan check---> Restuarant Plan Review--> TOTAL FEES----- 60.00 15. @ .00 78.00 Investigation> .0O Total Pernit teF------> 78.00 tli tt CaLt----> 3.00 Payments------- BALANCE DUE_--*********t******tl"t*t*t*t** rhhli*',t**rtftt*trtr***********f***** ffi**ffi**ffi***ffi*******ffitr Item: 05lOO BUTLDING DEPARTMENT lO/27/t995 CHUCK Action: APPR Dept: BUILDING Division: CONDITTON OF APPROVAL tffi **ffi ffiffr*ffi ffi **trr*rr**rr*ffi ff *ffi ffi *i*****ffi ****ff **ffiffi *ffi *ffiffi**ffi**ff *** DECLARATIONS I hereby acknovtedge that I have rlad this apptication, fitted out in ful.l the infofir€tion requi red, conpteted an accurate ptot plan, and state that atl the infornation provided as required is correct. I agree to conpty yith the information and ptot ptan, to corpty Hith al,l, ToHn ordinances and state [avs, and to bui[d thjs structufe according to the ToHnrs zoning and subdivision codes, design reviev approved, Uniform BuiLding Code and other ordinances of the Town applicabte REAUESTS FOR INSPECTIONS SHALL BE ITADE TIIENTY-FOT'R HOURS IN ADVAT{CE BY TELEPHONE ICE FROII {S rrn uoru", TOWN OFVAIL NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ELECTRICAL PERMIT Permit *z 895-0247 75 South Frontage Road VaiL Calarado 81657 970-479-2 I i 8/479-2 1 39 FAX 970-479-2452 Job Address Location. . . Parcel No.. Project No. APPLICANT HOLM CONSTRUCTION 4061 BTGHORN RD., VArL, CONTRACTOR HOLM CONSTRUCTION 4061 BTGHORN RD., VArL, OWNER HOLM REMODEL WATERS JOYCE, 4472 E CONTRACTOR RESORT SERVICES P O BOX 1079, AVON CO Description: ADDITION 4247 COLIIMBINE DR 2LOt-L22-14-O22 PRJ95-0230 co 81657 co 81557 LAKE CI, LITTLETON 8162 0 FEE SU!'IIIARY Department of Community Development Status...: ISSUED Applied..: Lo/20/L995 Issued...: l0/27/L995 Expires..: 04/24/L996 Phonez 97O-476-0384 Phone 3 970-476-0384 co 80121 Phone: 3039496013 Valuation:3, 000 . 00 E Iectri cat-> DRB Fee InvestigatiorD I'li t t Catt_--> TOTAL FEES--> 54.00 .00 .00 3.@ 57. 00 Totat Catcutated Fees--> Addi tionat Fees-------> Totat Pernit Fee-------> Paynents------- BALAIICE DUE__- 57.00 .(n 57. OO 57.00 .00 DEPI: BUILDING Division: trtt****Jrf,*****ffi**ffi**i-ffi ffi*#*ln***t*ffir1ffi*trfl ***t**trffi *ffi ***ff ff ,****t* CONDITION OF APPROVAT ffi *t***ffiffiffi**ftffi*ffi ffitffiffitiffi tr*ffi ffrffi ffiffiffi trt*ffi *#ffi** DECL.ARATIONS I hcreby acknoHtcdge that I have read this apptication, fil,ted qrt in fu , the information required, conpleted an accuratc plot ptan, and state that att the infornation provided as required is correct, I agrle to compty vith the information and pl,ot pLan,to conpty Hith a!1, ToHn ordinances and state taHs, and to buiLd this structure according to the Tovn's zoning and subdivisiori codes, design reviev approved, Uniforn Buil.ding Code end other ordinances of the Tor{n appticabte thereto. REAUESTS FOR INSPECTIONS SHALL BE IIADE TI.'EI{TY-FOUR HOURS IN ADVA'ME 8Y TELEPHONE AT OR AT OUR FRoil 8:00 All CONTRACTOR FOR HII,ISELF AND OI.INER IIem: O600O ELECTRICAL DEPARTMEITT LO/27/1995 CHUCK Action: APPR {Sr'n,*noru", o o [otrr %un-alo\ ct4 LIZ 31 At,rrnbtro Dr ru* Wt) F 72, 6aol Vt,i, tl Lurrc+Jlo1 Ohc,y1q.n1 -y1,^/' etqWd O\oc-+Y\cLch (nov- 6crvr1 )as- 4o 1vra*t {l tc-+v'ct ' dho,; 6lr.*rtc Vtao Yevrc--<.->cJ -J/l/'"- Pl"thSt \1t+ t k d *W 4 r4v^*t ctvtJ t,urll lz-cqt n Wa( \. -\/1^r, Wc4-V eF 1)"..'*"bc+ l8- ZZ Iqu6. Stqnne ," AM1 b"tor= - lbt,^ r7!zo lqs ,l I I # \ t di JNi ITE ,i\l I ll r I rll lrd f,i(4 CHECK REQUEST PREPAREDBY: 2a,,..- 12-1.t DNg Z "A VENDORNUMBER DESCRIPTION OF EXPENSE: CLEAN UP DEPOSIT REFIIND SOWgt- d32€ .4 NAMEOFJOB: .UZ) z-.a2-Jz ACCOUNTNUMBER OI OOOO 22002 AMOLINTOFREFUND, -,2t2. A DATE erpiovpp' 2,42,/qr APPROVAL SIGNATURE: --f- ^ ^ l.'o;- / lfrtftct' NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MECHANICAL PERMIT PErrNit #: M95-0186 tplor't 75 South Frontage Road Vail, Colorado 81657 970-479-2 I 3 8/479-2 I 39 FAX 970-479-2452 Job Address...:Locati-on......: Parcel- No.....:Project Number: D e p artrnent of C ommunity Deve lo p me nt 4247 COLUMBINE DR 2t0r-r22-L4-022 PRJg5-0230 HOLM CONSTRUCTION 4061 BTGHORN RD., VAIL. CO 81657 HOLM CONSTRUCTION 4061 BIGHORN RD. / VAIL, CO 81657 HOLM REMODEL JERRY SIBLEY PLUMBING P O BOX 340/ MTNTURN CO 81645 40.OO Restuarant P tan Revi e!,i-->10.00 DRB .00 3 .00 .O0 Tota[ Calcutated Fees---> .00 Additional, Fees--------->53.00 Total Permit Fee--------> Status. . . App1ied.. Issued. . . Expires. . ISSUED ro /20 /lee5 or/L5/ree6 o7 /73/ree6 APPLICANT CONTRACTOR OWNER CONTRACTOR Descr j-ption: ADDITION I'lechani ca L---> PLan Check---> lnvestigation> tlitt caL l,----> Phone: Phone: Phone: Valuation: #0f Gas Logs: 97 0-47 6-0384 97 0-47 6-0384 303827 57 36 2,000.00 fOf tlood/Pat Let:Fi reptace InJormation: Rest ri cted:fof Gas AoDtiances: tt****:ffi*fft***rr**ffff*ffiffilirffi#(*lrt*ff*rc*l****ff('Hr* FEE SUt'll'tARY *Jr*lr****ffff**ff***Jr**#ff*ffff*Jr******#*******ffi***t 53.00 .00 53.00 55.00 Ite-m: 051OO BUILDING DEPARTMENT OI/I5/7996 CHARLIE Action: APPR DepT: BUILDING Division: CONDITION OF APPROVAL 1. [']ELD TNSPECTTONS ARE REQUTRED TO CHECK FOR CODE COMPLTANCE.2. COMBUSTION AIR IS REQUIRE_D PER SEC. 607 OF THE 1991 UME.3. TNSTALLATToN MUST coNFoRM To MANUFAcTURES rNsrRucrroNS eno TO APPENDIX CHAPTER 2I OF THE 1991 UMC.4. gAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 9 AND SHALL TERMINATE AS SPECIFIED IN SEC.906 OF THE 1991 UMC.5. AqEEss ro HEATTNG EeurpMENT MUsr coMpt-,y wrrH sEe.sos Allo 703 0F THE 1991 r.JMC.6. BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST.UNLESS LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING.7, PEB!,IIT,PLANS AND CODE ANALYSIS MrUST BE POSTED rn uncnaNtcal,ROOM PRIOR TO AN ]NSPECTION REOUEST.8. DRAINAGE OF MECHANICAL ROOMS CONTAINING HEATING OR HOT_WATER SUppLy BorLEBg_SHALL BE EeurppeD wrrn A FLooR DRArN pen SEc-.2119 OF THE 1991 I.JMC.9. PLANS NOTE THAT 6" COM.AIR DUCTS WILL BE USED.8" IS REQ'D *** * * * * * * * ** * * * t ** ************ * * * ** * * * * * * * * * * * * * * * * * * * ***** * * * * * * * * * * * * * ** * * **** DECLARATIONS I hereby acknowledge that I have read this application, fi Lted out in fuLL the infornation required, compl,eted an accurate pLot {,7 r"""''"'''n"'* ptan, and to compty codes, des REaq0ilFlf ,rn Development Yail, Colorado 81657 970-479-2 1 3 8/479-2 I 39 FAX 970-479-2452 information provided as requi red is correct. I agree to compty with the information and p[ot p[an, this structure according to the Tovn's zoning and subdivision and state [aws, and to buitd Uniform Bui[din9 code and other ordinances of the Tovn appl.icable thefeto. BE l,lADE TIIENTY-FOUR HOURS IN ADVANCE BY TELEPHONE Af 479-2138 0R AT OUR OFFICE FROlt 8:00 A 5:00 Pl,l {P *""'"'"o '*u' * * *** ***r.J,***-*t ****d. TowN. OF VAIL, COLORADO statemnt ************cr*******************************Jr******************* l-vv * * * * * * * * * * * * * * d, t ************ Statemnt Number: REC-0 110 Amount: Payment Method: CHECK Not,ation2 +23657 53.00 oL/L5/96 t6to"t Init: MAC o ********* o ******* M95-Ol-86 TyPe: B-MECH MECHANICAL PERMIT 2LOr-122-L4-022 4247 COLUMBINE DR Total- Fees: 53.00 Tota] ALL Pmts: Balance: r. * * * * * * rt * * * * * * * * * * * J. rV tr * * * t t( tr * * tr * * * * r* * * * * * * * * * * * * * * t * * * * * * * * * * * * * Permit No: Parcel- No: Site Address: This Payment Account Code 0l_ 0000 41312 01 0000 4L332 01 0000 41336 Description }'IECHANICAL PERMIT FEES PLAN CHECK FEES WILL CALL INSPECTION FEE s3.00 53.00 .00 Amount 40.00 10.00 3.00 t'trd;1i Eagle County ol"or" 28-8640 for Parcel #.7at9l- iLL I.t oLQ QrX oF vArL "o"ro?rro*PERI'IIT # Pn.. v70 - ej6T , APPLICATION MUST BE FILLED OIII COIIPLETEIJY OR IT I'IAY NoT BE AccEpTED U I** ***** * ****'t * * * ************** PER!'IIT fNFORI{ATfON ** *********** * *** ****** **** * *rl [ ]-Building [ ]-plunbing [ ]-Electrical g]l-uechanicar t J-ofihgr / r-t/ , [2-, \ !/ I Job Narne: ll0lr-l P, r<drnc,z Job Address: rcq nrhO' ,. ttd, Legal Description: Lot owners Nane: UolFl Architect: PERMIT APPLICATTON FORM DATE: l- ri-CL Block_ Filing Address: Address:Ph. GeneraL Description: +DD -{ ln<"-"|. t?ud *o e.y s(.,V l_tec,+ ), Srf{_,n work class: [ ]-Ne]r ty'-lrteration [ ]-Additional [ ]-Repair [ ]-other Number of Dwelling Units:. 7.-Nunber of Accornmodation Units:I Plunbing Address: Contractor: BUTLDTNG PERMIT FEE: PLUMBING PER}TTT FEE: MECHANICAL PERMIT FEE: ELECTRTCAL FEE: OTHER TYPE OF FEE: DRB FEE: BUTLDTNG: STGNATURE: ZONING: SIGNATTJRE: BDIVISIoN: B"tA*n *r..", . B;at /^o.n e d, I {o Klbf7 llnber and Type of Fireplaces: cas Appliances_ cas Logs_ wood/pelret_ /f********************************* vAtttA;rfrwl e?;r*.'t-************************ BUTLDING: $ELECTRTCAL: I OTHER: $ Address: l,rEcHANrcAulw.TOTAL: I CONTRACTOR INFORI'IATfON *****'.*********** * *** *r* *** Town of Vail Reg. NO.Phone Number: Town of Vail Reg. NO. Phone Number: Town of Vail Reg. NO. Phone Number: Electrical Contractor: Address: Address: SrrX -<Va ,a-to<O (., ********************************FOR OFFTCE USE * * * ******* ************** ** ***** rown of vait Res. No.lL(-l Phone lifrrrnlrE3; 'gZl ST BUILDING PI,AN CHECK FEE: PLUUBING PI,AN CHECK FEE: I,IECHANTCAL PI,AN CHECK FEE: RECREATION FEE: CI-,EAN-UP DEPOSTT: TOTAL PERUIT FEES: CI.EAIT I'P I'EPOSIT BEFT'ITI' TO: TO: FROM: DATE: SURTECT: 75 south fronlrge rold YEil. coloredo 81657 (3031 479-2L.38 ot 479-2t39 acknowledged by: C 6 t \.\a-, ofllce ol communlly developmenl ALL CONTRACTORS CURRENTLYL REGISTERED WITH TITE TOWN OF VATL TOWN OF VAIL PUBLTC WORKS/COMMITNITY DEVELOPMENT ITfARCH 16, 1988 CONSTRUCTION PARKING & MATERIA! STORAGE rn sunnary, ordinance No. 6 states that it is unrawfuJ. for any person to litter, track or deposit. any ="ir,-tJ.k, sand, debris or naterial, including trash lunpsters, portabre toirets and worknen vehicres.upon any streetl siaewairl-;ii;y or public pJ*:" or any portion theieof. itre risrri:;;;;-i,n arr rown of vail streets and.Ig"g= is approiinateiy 5 ft.-6ti pavement.This ordinance wir] ue. strilliy--enforced by the Town of Vail Public works DeDartment. perslns found viirriiin! this ordinance will be given a 24 hour writien notice-to-;;;;=said naterial.In the event the person so notified does-";;-;;;ply with the notice within the 24 hour.tir"-=p""iii"a,"ti"-i"iric works Departmenr h'i1l remove said mateiiui-"i-ir.J"l*iJi=e of person notified. The nrovisions "f iiril ordinance shall not be applicable to c6nstruction, ,.irrt.r,.rr9e or repair projects of any street or alley or any utilitres in the.right_a_way. 'To review ordinance No- s in fur.r, please stop by the Tohrn of Vair Buirding DeparLment to obtiin a copy. tirani< you for your cooperation on this matter. Read and X_w f 6;E! /q lq L o 75 .oulh trontaga rord Y!,1, colorudo 81657 (303) 479-2L38 or 479-2L39 oftlcr of oommunlty dcvclopmorl BUILDING PERI{IT ISSUANCE TIME FMIIE If this peryl.t requires a Town of Vail Fire Department Approval,Engineer''s (pub'l ic t,lorks) review and approvat,' a piinnini'blpa"unent review or Heatth Department review, rni'a-"euiJ Li-il;";riioing Departnent, the estimated time for'a totar ;;ri;r-;"i"iail'"s tong as three weeks. A'l I commercial ('r aroe or smalr ) and ail mu] ti-family pennits will have to follow itre Suove menti6ned mixir* requirements. Residentia.l and.sma'l I projects shourd take a resser amount of time. However, if residential or smarler.projects impact the various auove mintioneo departments wi th reoard' to- necessai.y "eui "n, -tn.r" i"Jj".ii"ruv also take the three-weef perioJ.- Every.attempt wfil be nnde by this departnent to expedite this pennit as soon as possible. - i;"J!l undersisned, understand the plan check procedure and time L heI,. Oeflo(....t- Communi ty Develoomelt Department. TO: FROM: DATE: RE: rueuonnr'roum O ALL CONTRACTORS TOWN OF VAIL PUBLIC WORKS DEPARTMENT MAY 9, 1994 WHEN A ''PUBUC WAY PERMIT'IS REOUIRED Job Name: Hol m {22 { Date: I-U *qL Please answer lhe following questionnaire regarding the need for a 'Public Way permit.: YES NO 1) ls this a new residence? 2) ls demolition work being performed lhat requires the use of the right of way, easements or public property? 3) ls any utility work needed? 4) ls the driveway being repaved? 5) fs ditferent access needed to site other than existing driveway? 6) ls any drainage work being done affeAing the right of way, easements, or public property? 7) ls a "Bevocable Right Of Way Permit' required? 8) A. ls the right of way, easements or public property to be used for staging, parking or fencing? B. lf no to 8A, is a parking, staging or fencing plan required by Community Development? !!V9u- alswered yes to any of these questions, a "Public Way Permit' must be obtained.?ublic Way Permit' applications may be obtained at the Public Work's ofiics or at C9.1ry1u1ity Development. ll you have any questions please cail Chartie Davis, the Town of Vail Construction Inspecior, at.479-Z1SB. I have read and answered allthe above questions. Job Name Conlractor's S i g nature i, Li('cL <;r s\, 'tJ ti ,$ .b p ts_t g i's Hlgr ntrag6 Bg 3*a rra$ E; flr i i l I l L|-Tt Tlx C,= f,-T$6 d*;r.f-,!-+---------ib - i. u:I!^l:.o i- T ) \ \t r llB iI (F )i t. t!;lr /,/-. rz"il tr 3 ri@ I ) o Eq tr,i t' .-'LI. "tr' -tt fts .it_ 7s \'tT h il .F fFt 3gE z- dts r) T' .\ i\ (^] e' r'c L $j \t t -1$ --r --:l I t \$. I r-- - \'.\. l[.-'--. t9 t iE_ --ri. a-*- t" =E , id: .$ I-i{- 3+lXt-. tt "l\ ',?tt _J : : I ;I - . \G )*lil-f iils\f/ rI-<Y + ,,}F ;__:= l]$i i l---, r ss ii =11$i fl ---:] s; ; ,,1 | +q," *mR ttl " I;"1 E -_!s I FB-{i$ &'q i Tt 5-3 ;-< tiil irl ', I iil lii iil :il il ii ,': I il'i -l I. JSP INC. s c {^,{ \) ;I fi. I C s.?. r\ Fax:970-E?7-5234 D t lr tl q t F o h 9- .1 t 0 (, * Cr {' Jan 8 '96 It r+ e $et q \rr fe + I H H !U r+ -.1 o F EI l-a a a o E h b H H z ut + I l4t x I $ F rt Fl 3 o o o H EH FE B I S=..l 9--t ,l' a c-g F rn 7 nr 1".F L; r\o trl K ? o c6 t ?, o of,n Review Action rt TOWN OF VAIL (Category Number - /lo Project Name: Building Name: Project Description: Owner. Address and Phone: # ftY- etu3 ArchitecVContact, Address and Phone:^Pl ,l"6atr Legaf Description:tot 7 kglock - Project Street Address: Comments:^/ Xtn L /f fg t\\lau o //o,lr,r(.rn.L{r^. Zro Board / Staff Action Motion by:Vote: Seconded by: ! Approval ! Disapproval dstarnonrovar Conditions: (/ ) K,"' n^,t - *p /e oraY-roy, Pe^',f a,{ 2. /7*, ef 2 /'rr.Q., ,ra /f r /a ? F, I DRB Fee er"-p^ Town Planner "*'"";;l;; *"'-*l*o ApprJrcArroN - rowN olo, corJoRADo I. A. DATE RECEIVED: DATE OF DRB MEETING: ********t* INCOIIPIJETE APPIJICATIONS I'[AY NOT BE SCHEDULED FOR REVIEW.********** PROiIECT INFORMATION: DESCRIPTION: *{Ti'I u y'i'l.tL /-F '= *=7 <-Et/ 71- w S c-l L,.- t'74//,,2', z.'.t <=t2-. l:Z-t-'ij-Z- o 'i r", *_) B.TYPE OF REVIEW: New construcEion ($200.00) -y-Minor Alteration Addition ($50.00) '- eonceptual Review ADDRESS , 4z='l Co+ ane,*a c>€- |.iJI , ( -' ($20.00) ($0) D. F F. I. iI . LEGAIJ DESCRIPTION: LOL ,7.2 Block Subdivision E(4 r tc.f '-r i €-f c''{cC If property is described by description, pLease provide to this application. ZONING: NAME OF Mailinq a meeEs and bounds on a separate sheet 1ega1 and attach G.NAME OF Mailins APPI,ICANT:&-176? Address: 4i? 3--l Cc'c.-,-r6,^rs oz- Phone <l?o - /17 6 .- t>-gt' L/ APPLICANT' S REPRESENTATIVE :Sra n-t Address: Phone H.NAI{E OF OIIINER(S): OhINER(S) SIGNATTIRE: Mailing Address:qL< 7 /<.:- P/:?- Phone ??r.' '-a /G o3ar APPI'ICAIITONS WILL NOT BE PROCESSED WITHOW O''NER ' S SIGIiTAIIURE Condominium Approval if applicable. DRB FEE: DRB fees, as shown above, are to be paid at the time of submit,Lal of the DRB applicaEion. Later, when applying for a building permit,, please identify the accurate vaLuation of the proposal . The rown of Vail- will adjust the fee according to uhe table below, to ensure Ehe correct fee is paid. 7.,//'_ FEE SCHEDUI.IE: VALUATION $ o $ 1o,ooo $ 10, 001 - $ 50, 000 $ 50, 001 - $ 150, 000 $150, 001 - $ 500, 000 $500, 001 - $1, 000, 000 $ Over $1,000,000 DESIGN REVIEW BOARD APPROVAL EXPIRES APPROVAI ITNLESS A BUILDING PERI,IIT IS IS STARTBD. FEE $ 20.00 $ s0.00 $100.00 $200.00 $400.00 $s00. 00 ONE YEAR AFTER FINAIJ ISSUED llID CONSTRUCTION e--.41- ZONE DISTRICTS DATE: -O'? fl I,EGAI, DESCRIPTION: LOL Z!'STO"X - a subdivisio 3.:; t--r',^ r^'--/ - ADDRESS: OWNER PTIONE PIIONE D,,,--*.ARCI.TITECT scEbacks P,Jruf ZONE DiSTRICT PROPOSED USE LOT SIZE Ileiqht TOEAl GRF /2 73 r 7fct t Primary + 425 sccoDd{ry GRF -{4..v,.,6 ryg BUILDABLE tOT AREI\ Existinq Pronosod ToEal Allowed (30 ) (33 ) /lf,3 on L, Sides Rcar b"rt' 20' 15', 15'-r Porc/,,.e J -/o\iJ iloD D Parkin Reqrd Caragc CrO<li t (300) (600) (900) (1200) Drivc:ParmiLLcd slope -!- Pt ComfrLies wi th Light,ing Ordinance Y waLer Coursc Seubaclc (30) (50) (s0r)Do Finish Grades Excced Environmen Eal /IIazards : 'ood Plain Perccnt Slope (< > 30t) logic l{azards Snow Avalanche ockfa11 ris FLow Vicw Corr ffi Bncl scd SLope * NO NO YES roques t ? Wot,Lands 6r nncroachmant: Yes reqries of the invoive d 250 irridi Liutt? Addicion is used 10 DeQn Review Action for0 TOWN OF VAIL category n ^o" D^r. / ('" /i ff erqectxamet /*(a'. thr,-b*-c-( Building Name: ,4 s&-, /r"*(^,/*'^rro,.rt /e^''nJ--(Project Description: ---z' j''rft aI Owner. Address and Phone: /'' /4 f Architecvcontact, Address and Phone: Legal Descripti on:Lot 2 ) Block-Subdivision Zone District Project Street Address: Board / Statt Action Vote:Motion by: Seconded by:_ &'r^ ! Disapproval {it.rapprouut /l /*4 7--- / i 7f Town Planner Date: ? Z .t 7f DRB Fee Pre-paid t lolQn{ fo(no.14 (- 75 South Frontage Road Vail, Colorado 8]I657 970-479-213V479-2139 FAX 970-479-2452 De partment of C ommunity Deve lopment Octobcr 10. 1995 Don Bycrs Fax:476-8950 Dcar Don: As discusscd in our phone conversation earlicr today, we have agrecd to the following itcms: s(g nppry stucco or other textured finish to the portion of the concrete foundation that is exposed bctwecn the ground and the lower end of the siding. SQI Providc 8 I linear feet of mitigation for thc loss of a large cvcrgrccn tree. As wc discusscd, plcasc propose additional cvergrcens on thc sitc/landscaping plan. t4rfnc corner of the deck must bc cut back so that the deck and stairs accessing the deck are no closer than tcn fect to the wcst propcrty linc. ,r/@)fne Dcsign Rcvicw Board askcd for additional foundation plantings in front of thc unit and adjaccnt to thc parking areas. Please add some landscape matcrial in thesc areas to the ./ sitc/landscapc plan. 4Sl el roofing materials must bc consistent on both halves of the duplcx. You have rcprescnted to mc that tar and gravcl currently exist on the unit. Thc new addition must havc tar and gravcl as wcll, or wc must havc approval from the adjacent property owner to changc material ,/ on his half as well as your half to asphalt shinglcs. '/ rc\ paint thc cladding on your unit. 4l\thet" is a largc fir trcc along thc backside of the proposed addition. Both Planning Commision and Thc Dcsign Rcvicw Board conditions require that this ffee be saved and that the dripJinc of this tree be protccted with snow fencing throughout the construction process. Plcasc show this tree on your site/landscaping plan, and add a notc dcscribing how this trcc will be protccted during the construction process in accordance with Dcsign Review Board and Plannins and Environmental Commission condition. Pleasc ammend and resubmit your plans as soon as possible. If you have any qucstions regarding this matter, plcasc feel frcc to call mc at 479-2150. Sinccrelv.4'r'd /(*-4 I Randy Stoudcr Town Planncr {2 *u"'""o 'o"r Single Family / / .' t..a-/L'(: ') ZONE CHECK . FOR Residence, Duplex, Pri ZONE DTSTRICTS t mary/ DATE: PTIONE Pr{oNE:' secondary i:- r) LOT AREA Propos_ed 2-'s I,EGAI., DESCRIPTION:'to: L '/ -.. -/r ,'..")r '.1 Block Subdivision 'l; -t 'l T.nr qr7.E ')r/1Lh /0..",:-r' BUTLDABLE . 4fl-ow9,q -'(!xi s cine .,, .-t{. \"Heishe [3e)-+:-3f Primary GRFA / 'l 42 + Zto /",- a )lJ >4- -l 2 {., ar:ft - L *"a22 =l(q 3 CSecondary €RFA Jetbacks FronL S ides Rear '-/ Site Coverage i1 51, ,-{andscapinq 9,-'to 'fri.uuitti.rg wal1 lleight s Pafking V2 i" 'l't;':I c-' i'iz'-{''- ',,, - 'i''.i7v .'> 1t:z v'''- " [l{'l"r( + ('t1-','r,," 't e',',',// s , y _.,.-rr ,<.fr.... A r'' ) t t'','\'l ''/tt'' r) 7 ) &_ -ir'.. ,\ 20,+y ?'' 1j-, -t (' /z"t ( 3'/6' I neqrd ,V/7+-- Z ,f.l t).iio \h ,,;. ry':,.'Jt, +. A3 (-' EncI t lr' Yfffcaraqe crediL Nltoriuet /./'c clu.'y ..-dnv i ronmen LaI / Hazards : (300) (600) (900) (120_0)_ PermiLLcd srope ot| t'-"itopos.a Slope NO t --4,i--(complies w.i th T. O.v. LighEing Ordinance {r"t'c,/ ci (, s; x''/s waEer coilrse SeLback (30) (50) ffi" Finish Grades Exceed 2:1 (50%) Yes I YES Flood Plain Percent SLope 1< > 30%) Geologic Hazards a) Snow Avalanche b) Rockfall NO.....-- II 2) 3) c) Debris FIow wetlands /1a SEtr :9 '95 10: LJHfl 1..1:'L\ iFrl:s /fiil F.1 Mr. and Mrs. Klaus Holm c/o Mr. Don Byers 352 tseaver Dam Road Vail, CO 81657. . ,j,' Jchn Boyd Engineering Technician cs: 95-14950:5R'71 :Bighorn cc: HCEA Vail Terrace-Lct 22-$ec.Rel, L prepared for lhe. lglb.cation of fhp: gxigiin g ovA'iheaA se. qgii{at ..bo.u? T glltiqqgo t,?geiign Thq fscilities wlll .bs,reloqilgd,f i. .....s.l]. . -.:.. Holy Cross Eiectric,Association, Ino. .n,/ . v' \.'*:v--1n /^ lti't .- . "1't r ^1 ,\': HOLY CROSS ELECTRIC ASSOCIATION, INC. 3739 FilGllWA',' s2 P,O. DRAWER !i50 GLENIVOOD sPRt\cs, COLQRA9C Sl60? Sepierrrber 28, i995 Dear Mr. & prepare.C for lhe. lglocati above mentioned locatio iing ovdineaa bg-qgli.dqry electric lind'at the {9:Jl 945-5.i! 1 iFA.\) 915-404 i J.rl To: Randy Stouter Town of Vail Town Planner Dear Randy, Encloseri ple:rse find updated plans containing minor changes to the alreaCy existing and approved plans for 4237 Columbine Drive in East Vail. Trvo ietters accompany these arnended plans: one from U.S. West Communicatic.ns notirlg a schedule that is already underway to bury all phone lines fronr pole to pole and Holy Cross Electric to move the cxistirrg electric lines behind tlre above mentioned address to a more convenient location in order not to interfere in any way with the proposecl arnended plans for the remodel. We are requesting that the decision to approve or deny the changes in the plans that we are presentin.g to you today, the second day of October 1995, be dealt rvith at u staff le.,'el in order io experlite our del;ire tcl complete the remodel this *.all in October. F..lovember and some p,art of Decemtrer. 'Ihallk vcri tct 'rour time and tho:rre) r,r 476-9t50 lwork) at please co:ltact us at either 475 0384 havc questions. R vgrrds, ,\it1y ver!;Holni and iat:s Holm Fg H-rd 8tr3 "5 G-} gE ftsl-r ?€F SEF a9 '35 lijr:1:i:i Extsl1P6 Po r.lE 6 Pf;'M4q: PCLE rJcl rJ7'95 E9:a5nt'1 TEt.i CONI'IUf.IICRTIOI'i5, Iria. v t-. r TA'. AW Seyens-ltouvr- 422,T btunBdE bR. vAtL) 4.6 l|F]Er' couuuurcnnous@ 4aX zr995 Ta fi!/,ail fi fifr/ fu^tURN, lls UJEST Ctrnnuvtendps *les Eagitt:Jl?-S A CABL€- a^B Tla PLA(E 4nnLg BuRrEb A}t.ass TrtE A?lJuE ?R,PELTy /AJ CLLfuiln- PKtL'r.bEi 81 dIrTUER,. AtL 4ERIAL SERUIOE LIlllES TA BF f,€.ft16I8b UPA/0 UMPLETilT.} OP NEtA CABIE' B^b SPuuatA, T#E A.tsAuE ttISTnLLAT/tA) IS sct4l:Du ff\ .bllR/IJ A 7+tE miilTrt dF ^LT^BETL fiq6. Swaercty'^ ' l1 tt /1 f,c/W,ilsraUWuLtaa AJ,\oa)n/-b 6RE5s c\L T€ LECd m 17 u^t t CAT/a A/,5 ENG'Aftru FbR IJs IAESl 1{74809 t.vtr.d, alt1 fga DESIQ{ REllIBlf BOAXD APPIJICATION - TOI|N OF VAIIJ, COITCTiAI}O DATE RECETVED: DATE OF DRB MEETING: *rt**atrl*** TNCOMPLWE APP'I(:ATIONS IITAY NOT BE SCHEDWED FOR NEVTEIT. . a*tl****** PROiIECT INFORUATIOI{:I. A. B. D. E. F. ZoNTNG: (ftd,,vwrQc ^,+'t (][|tl+rfi f<,vni'lQt4tt. t REPRESENTATIVE: 0+ p Phone H.NAITIE OF OlrlNER(S) : APPIJICA,'IONS WII]J NOT BE PROCESSED WTTHOW OWNER'S SIG,NATURB Condominiun Approval if applicable. DRB FEE: DRB fees, as shown above, are to be paid at the time of submitEal of ttre DRB application. Later, when applying for a building pennit, please identify the accurate valuation of the proposal . The Town of Vail will adjust the fee according to t,he table below, to ensure the correct fee is paid. a0,b8 I. J. FEE SCHEDUIIE: VAIUATION $ 0 $ 10,000 ,lr '! ..l ar al 'l ar F^ ^^t\|? +v r vvl v .rw t vw\) $ 50, 001 $ 150, 000 $150, 001 $ 500, 000 $500,001 - $1,000,000 g Over 91,000,000 DESI(tr{ REf,TIgT BOARD APPROVAI E)(PIRES APPROVAI, TINIJESS A BUIIJDING PERUIT TS IS STARTED, NAIT{E OF Mailing Phone G.NAI'IE OF Mailing APPITICAIII 'S Address: l0 @ FEE $ 20.00 rP Jl,. t',V $100. 00 $200.00 $400.00 $s00. 00 OITE YEAR AflTER FINAIJ rssuED AltD collsrRucTror{ TYPE OF REVIEW: New Construction ($200.00) / uinor Alt,eration ($2O.OO) Addition ($50.00) _lConceptual neview ($0) C. ADDRESS: IJEGAL DESCRI Subdivision If property description,to Ehis appl APPLICAIVI: Address: is described by pLease provide ication. a meets and bounds on a separate sheet 1ega1 and atEach Mailing Address: rr. A pre-appLication meeting with a member of the pLanning staff is encouraged to determine if any additional applicaLion information is needed. It is the applicant's responsibility to make an appointmenE srith the staff to determine if there are additional submittal reguirements.Please note that a COMPLETU application will sLreamline the review process for your project. III. IMPC}RTAIIT NC||TICE REGARDING AI.TII SIIBITIISSTONS TO 1THE DRB: A. In addition t,o meeting submittal requirement,s, the applicant musL stake and tape Ebe project, site to indicat.e property 1ines, building lines and building corners. All trees to be removed must. be taped. A11 site tapings and staking must be completed prior Eo the DRB site visit. The applicant must ensure that staking done during the winter is not, buried by snow. B. The review process for NEhI BUILDINGS normaLly requires two separate meet,ings of Ehe Design Review Board: a conceptual review and a final review. C. applicants who fail to appear before the Design Review Board on their scheduled meeLing date and who have not asked. in advance Ehat discussion on their item be postponed, wiLl have their items rernoved from the DRB agenda until such time as the item has been republished. D. The following it,ems nay, at Lhe discretion of the zoning adminiscrator, be approved by the ConnuniEy Development DeparEment sLaff (i.e. a formal hearing before Ehe DRB may not be required): a. windows, skylights and similar exterior changes which do not alLer Ehe existing plane of the building; and b. Building addiLions not visible from any other 1ot. or public space. At the time such a proposal is submit.ted, applicants must include letEers from adjacent property owners and,/or from the agent for or manager of any adjacent condominium association sLaLing the association approves of t,he addition. E. rf a property is located in a mapped hazard area (i.e. snow avalanche, rockfall, flood plain, debris flow,wetland, etc.), a hazard study musE be submitted and the owner must sign an affidavit recognizing the hazard report prior to the issuance of a buildinq permiE. epplicants are encouraged to check with a Town PLanner prior to DRB application Eo deterrnine the relationship of the property to all mapped hazards. F. For all residential consEruction: a. Clearly indicate on the floor plans the inside face of the ext,erior sLructural wa11s of the building; and b. Indicat,e with a dashed line on the site plan a four foot distance from the exterior face of the building wa11s or supporting colr:nurs. c. If DRB approves the application with conditions or nodificagions, all conditions of approval must be addressed prior to the applicacion for a building permit. rv. A. Three copies of a recent Eopographic survey, st,anped by a Colorado Professional Licensed Sunreyor, aE a scale of 1" = 20, or larger, on which the following informat,ion is provided: 1. tot. area, and buildable area when different than lot area. 2. Legal description and physical address. 3. Two foot contour inLervals unless the parcel . consists of 5 acres or more, in which case, 5 'contour intervals may be accepted. 4. Existing trees or qroups of trees having trunks with dianeters of 4rt or more, as measufed from a point one foot above grade. 5. Rock outcroppings and oEher significant, natural features (Lar9e boulders, intermittent st,reans, etc. ) . 6. Hazard areas (avalanche, rockfaI1, etc.),centerline of stretrms or creeks, requirecl creek or stream setback, and 100-year flood plain, if applicabte. Slopes of 40t or more sha11 be clearly delineated by cross hatching. 7. Ties to existing benchmark, either USGS landmark or serrer invert. This information must be clearly staUed on the survey so that alL measurements are based on the same sLarging point.. This is particularly imporEant for deLermining building height and driveway slope. See Policy On Survey rnformation, for more information regarding surveys. 8. IJocations of the following must be shown: a. Size and clpe of drainage cuLverts, swales, etc. b. ExacE location of existing utility service lines from their source to the structure,including: Cable Tv Telephone Sewer Gas wat,er Elect,ric c. All ut,ility met,er Locations, including any pedesLals to be located on site or in the right-of-way adjacent to the site. d. Property lines - distances and bearings and a basis of bearing. e. IndicaLe all easements identified on the subdivision p1at. 9. Provide spoL elevations at the edge of asphalt, along the street frontage of the properEv at twenty-five foot intervaLs (25,1, and a minimum of one spot elevation on either side of the lot. Site PIan 1. Locations of the following must be shown: a. Existing and finished grades. b. Proposed surface drainage on and off site. B. ". t.nosed driveway, r".r"uhercenc srope and spot elevat.ions at. the property 1ine,. grarage slab and as necessary along the centerline of the drive to accurately reflect,driveway grade. d. A 4' concrete drive pan at the edgre of asphalt for d.riveways that exit the street in an uptrill direcLion. 2. All existinq inprovenents including structures, landscaped areas, service areas, storage areas,walks, driveways, off -st,reet, parking, loading areas, retaining walls (witn Eop and bottom of wa11 spot elevations), and other existing site improvements. 3. In order to determine proposeil building heights elevations of all top roof ridges, and eaves when determined necessary by the zoning administrator,shaIl be indicated on the site plan with exist,ing and proposed.conEour lines shown underneath. Landscape Plan (]t' = 20'or larger) - 3 copies required 1. At a minimum, the following information must be provided on the landscape plan: a. IJocation of existing Erees 4" diameter or larger, b. Type, size and location of all existing and proposed plant material, c. IJocation of aLl Erees to be Lransplanted, d. A detailed legend of all proposed plant, material including coflrmon and LaLin names. 2. The location and t11pe of existing and proposed watering systems to be employed in caring for plant material following its installation. 3. Exist,ing and proposed contour 1ines. Retaining walls should be included with the contour information with top of wa11 and bottom of wall elevaEions listed. 4. CompleEe the at,t,ached landscape materials list. D. Sion off from each utilitv companv verifying the location of utility service and availability (see aLtached utility verification form) . A preliminarv title report. Schedule A and B must accompany all subnittals, to insure property ownership and identify all easements affecting the subject.property. Architectural Plans (179" - lt or larger, !/4n is preferred scale for review) 3 copies are required. 1. FLoor plans and all elevations of the proposed development drawn to scale and fully dimensioned. Tne elevagron ctrarvings must show both existing and finished grades. 2. One set of floor plans must be I'red-Iined" to show how the gross resident.ial floor area (GRFA) was calculated. 3. Exterior materials and colors sha11 be specified on the attached materials 1ist,. This materials list must be cornpletecl and submitted as a part of the application. Color chips, siding samples etc., shall- be presented at the Design Review Board meeting. Details including, but noL limiEed E. F. to Locations, etc. must be shown graphically and fully dimensioned. Zone check List (attached) must be completed if the project is loeated within the Singte-Family,Prinary/Secondary or Duplex zone disbricts. Photos of the exist,ing site and where applicable, of adjacent structures. The Zoning AdninisErator'and/or DRB may require the submission of additional p1ans, drawings,specificat.ions, samples and other materials (including a model) if deemed necessary to determine whether a project will comply with Design Guidelines. }IINOR AI,TERATIONS 1!O TBE EXTERIOR OF BUIIJDIIiIGS. Photos or sketches which clearly convey the redevelopment proposal and the Locat,ion (siUe plan) of the redevelopment proposal may be submitt,ed in lieu of the more formal requirements set forth above, provided all import,ant specificat.ions for Lhe proposal including colors and mat,erials to be used are subnitted. VI . ADDITIONS - RESIDET'|ITIAI' OR COIIMERCIAIJ A. Original floor plans with all specificaEions shown. Three sets of proposed floor plans L/$" = 1' or larger (t/4,' = 1, is preferred) Three copies of a site plan showing existing and proposed construction. Indicate roof ridge elevations with existing and proposed grades shown underneaEh. Elevations of proposed addition. Photos of the existing sLructure. Specifications for all materials and coLor sanpl,es on materials list (attached). H. I,. v. B. c. E. F. At the request of the Zoning ldninistrator you nay also be reguired to subnit: G. A stat,ement. from each utility verifying location of service and availability. See attached utility locaLion verif ication form. A site improvement survey, stanped by registered Colorado Professional L,icensed surveyor. A preliminary title report, to verify ownership of property, which list,s all easements. VIT. FINAT SITE PI,AIiI once a buildinq permit has been issued, and construction is underway, and before the Building Department wiLl schedule a framing inspection, Lwo copies of an Improvement Location Certificate survey (IL,C) stamped by a regisEered professional engineer must be submitLed. The following information must be provided on the ILC: A. Buildinq location(s) with ties t,o property corners,i.e. distances and angl-es. B. Building dimensions t,o the nearesL tenLh of a foot. IJ c. All "dTservice line as-buirrs,**r"n rr'e or material used, and size and exact location of lines. Basis of bearing to tie to section corner. ALl property pins are to be either found or seL and stated on improvemenL survey. All easements. Garage slab elevations and alL roof ridge elevations with existing and proposed grades shown under the ridge lines VITI .CONCEETUAII DESI(W RTVIEW A. SubmittaL requiremenLs: The ov,mer or authorized agent of any project requiring design approval as prescribed by t.his chapEer may submit pLans for conceptual review by the oesign Review Board t,o the Department of Conmunily Development. The conceptual review is int.ended t.o give tlre applicant, a basic understanding of the compatibility of their proposal with the Town,s Design Guidelines.' This procedure is recommended primarily for applications more complex than single-fanil.y and two-fanily residences. Holvever, developers of single-family and two-fanily projecus shaIl not be excluded from Ehe opporLunity to request a concepEual design review. Complete applications must be submitted 10 working days prior to a scheduled DRB meeting. The following information sha11 be submitted for a conceptual review: 1. A conceptual site and landscape plan at a minimum scale of one inch equals trdenty feet; 2. Concepcual elevations showing exterior materials and a clescription of the character of the proposed sLrucLure or structures; 3. Sufficient information t.o show the proposal complies with the development sEandards of the zone dis'trict in which the project is t,o be Located (i.e. CRFe, siEe coverage cal-culations, nudber of parkinq spaces, etc.); 4. Completed DRB applicaLion form. B. Procedure: Upon receipL of an application for conceptual design review, the Department of Corununity Development shall review the submitted materiaLs for general compliance with the appropriate requirements of the zoning code. If the proposal is in basic conpliance with the zoning code requirements, the projecL sha11 be forward.ed. to the DRB for conceptual review. If the application is not, generalLy in compliance with zoning code reguirements, the application and submittal materials shalL be returned to the applicant with a written explanation aa to why the conmunity Devetopment, DepartmenE staff has found the project not to be in conpliance with zoning code requirement,s. Once a courpJ.ete application has been received, Ehe DRB shalL review the submitLed conceptual review application and supporting material in order to determine whether or not the project generally complies with the design guidelines. The DRB does not vote on conceptual reviews. The property owner or his represenEative sha11 be presenL at the DRB hearing. D. F H. LIST OF MATERIAI,S NAITIE IJEGAIJ OF PRO.]ECT: DESCRIPTTON:r.oT_ gIJocK STJBDIVISTON STREET ADDREsS z 423'l (ntr",anrn-Qlu.- L)n,,-y # Z2- The following information is required for submitEal Review Board before a final approval can be griven: A. BUII.DING UATERIAIJS! TYPE OF MATERIAIJ Roof Siding Other wall Materials Fascia Soffits Windows Window Trim Doors Door Tiim Hand or Deck Rails Flues Flashinqs Chinneys Trash Enclosures Greenhouseg Retaining WaIIs ExEerior Light,ing Other Designer: Phone: to the Design COLOR Ir LI Lutll h y,. rucd I ^.- -. B.LATiIDSCAPING: NAme of prJArqr !'ArERr* Fotanica'r NFme co'**t ouantitv size* PROPOSED TREES AI{D SHRI'BS *Indicate caliper for deciduous trees. Minimurn calioer for deciduous trees is 2 inches. Indicate height for coniferous trees. Minimum heiaht for coniferous trees is 6 feet.**Ind.icate size of proposed shrubs.5 crallon. Minimr:m size of shrubs is TVDe Square Footaoe GROTJND COVERS soD SEED TYPE OF IRRIGATION TYPE OR METHOD OF EROSTON COMTROI, C. LANDSCAPE I-,fGHTfNG: ff exterior lighting is proposed, please show the number of fixtures and locations on a lighLing plan. Identify each fixture from the in Lhe space below and provide the height above liqht proposed, lumen outpuu, luminous area and the lighL fixture. (Section 18.54.050 .I) separate lighting plan grade, tlpe of a cut sheet of D.OTHER I,AIiIDSCAPE FEATURES (retaining wa11s, fences, swiuuring pools, etc.) Please specify. fndicate heights of retainingr wal-Ls. Maximum heighL of wal1s within the front setback is 3' . Maximum height of walls elsewhere on the property is 6' . rqrlaed, A/L7 /94 'JOB NAME TOWN OF VAII-. UTIIJI1IIY IJOCjATTON VBRTFIeATIOII FORU ST'BDIVISION LOT BIJOCK FILING ADDRESS The form is used to verify service availability and location. This should be used in conjunction with preparing your utiLity plan and scheduling installaLions. For any new construction proposal, the applicant must provide a completed utility verification form. The Location and avaiLability of utilities, whebher they be main trunk lines or proposed 1ines, must be approved and verified by the following utilities for the accompanying siue plan. A11 authorizing signatures need to be originals. Authorized Signature Date U.S. west Communications 458-6860 or 949-4530 Public Service Company 949 - 6135 Gary Hall/Rich Cooley HoIy Cross Electric Assoc. 949 -5892 Engineering Dept. Ted Husky,/Michael Laverty **TCI Cablevision of 949 -L224 Mark Graves the Rockies **Upper Eagrle vaIley water & Sanitation District * 47 6 -7 480 Fred Haslee **A siEe plan is required. Pbysical location of kaowa utilities must be shown on tbe site plan. Utility locations nay or Bay Dot offer serwice to tbe property 1ine. Any utiliEy extenEion required shall be the responsibility of the Broperty owner. NOTE: 1.If a utiliEy company has concerns with the proposed consEruction, the utility representative sbould not directly on the utility verification form thaE there is a problen which needs to be resolved. The issue should then be spelled out in detail in an attached lett,er Eo the Town of Vai1. However, pLease keep in mind that iL is the responsibility of the utiliEy company to resolve identified problems. rf the uLility verification form has signatures from each of the utility companies, and no conments are made directly on the form, the Town will presume thaL there are no problems and that the development can proceed. These verifications do not reLieve Lhe contractor of his responsibility Lo obtain a street cut permit from the Town of Vail, Department of Public works and to obtain utilitv locations before diqging in any public right-of-way or easement in the Town of vai1. A buildinq permit is not a sLreet cut permit. A street cut permiE rnust be obtained separately. Installation of service lines are at the expense and responsibility of the property owner. 2. 3. 4. o o 4 I t d iT d f, oo fu 75 South Frontage Road VaiL Colorado 81657 970-47 9 - 2 I 38/479-2 I 3 9 FAX970479-2452 Department of Community Development September 11, 1995 Amy Byers 10O East Meadow Drive Vail, CO 81657 Re: Clarification of DRB and 250 extension letter to Ms. Snith Dear Amy: f offer this letter as cl-arification of my earlier letter to .loyce Smith-waters dated 8/L8/95 (cclly attached) . My letter to Ms. Smith extended t.he August 17, 1994 Design Review Board (DRB) approval of the building addition plans and the authorization to use one 250 Additional GRFA allotment for an additional period of one year. Thus, a building/construction permit must be applied for prior to Augrust 17, 1996 or the DRB approval of the addition and the use of the 250 GRFA allotment will 1aPse. If you have any further guestions the number listed above. Sincerely, t?.,-ftu-( %-.-,/,\-: --, a) l- , r -'/ Randy Stouder Town Planner please feef free to call me at tP u*''o'uo ao t[-E 80PY 75 South Frontage Road Vail" Colorado 81657 970-479-2 I 3 8/479-2 1 39 FAX 970-479-2452 August 18, 1995 Department of Community Development Amy Byers f O-0 East Meadow Drive Vail, Co 8l' 657 Re: Undergrouding utilities at 22 Bighorn Terrace Dear AmY: Thanks for taking the time to meet with me and discuss the situatj-onregardingutifiti-esattheabovereferencedproperty.A specifj.c conditi;i oi tn" Design n..rie, ge3;d (DRB) approval of a rlmoaef and a building addition request was: ..Buryalloverheaduti-litiesbetvleenthetwopolesshownon the site Plan." This condition was necessary since the second story of the proposed addition would intertere tltf' ttre existing power and phone- lines mounted on these pl-i"". - wot^ally, the addition of square fo9!19" to a duplex woul-d'ttiSS"t a requirement to underground all utility service lines leading to the duplex unit -where the addition is requested. tit.lr", ii 1io,, to*t Uacr to the DRB and gain approval for an addition to tne-f,"if-""-inut will not interfere with the existing overhead utiritres leading to the adjacent_duprex, you wilr onry need to bury the service lines to yolr duplex'. rn your specific case, this woul-J ""t"if burying the power and phone }ines' If you have any further questions please feel free to ca]I me at the number listed above' SincerelY, G1 fr,-F--- Randy Stouder {S rrn"uor*o ?'tt COPY 75 South Frontage Road Vail" Colorndo 81657 970479-213V479-2139 FAX970479-2452 Aurgust 18, 1995 Department of Community Develnpment Ms- Joyce Waters Smith 788P W.70th Drive Arvada, CO 80004 RE DRB Approval Extension atLol22, Bighorn Tenace Dear Ms. Smith: Thank you for your letter of August 8, 1995. In response to your.request for an extension of the Oesiln neuiew Board (DRB) approval dated August 17, 1994, which included approval 9f an-. . additTonal 250 square tbot dnfR allotment, I am hereby granting you a -ole year exlension' This extension is in accordance with Design Review Guidelines, Section 18.54.110, which states that Community Development staff may extend the period of approval if there have been no zoning revisions or amendments to the Guidelines that would alier the conditions under which the approval was given. It as our finding that the Design Guidelines have noi been significantly amended since your approval was granted. The previous approval, due to expire on August 17, 1995' will now exiended to a date of August 17, 1996. lf you do not submit for a building Permit Prior to this date, your approval will lapse and you will have to re-apply for design review approval' your letter also conlained a request to extend the Planning and Environmenlal Commission (pEC) approval of variances foi side and rear setback encroachments. Variances expire two (2) years'trdrir the date of approval. The PEC granted the setback variances on August 8, 1994. ihus, these variance approvals are still valid and will not expire until August 8, 1996. No extension is necessary at this point. lf you have any questions regarding this matter, please call me at the number above. Sincerely, Randy Stodder xc: Amy Byers (FAX 476-0495) {g *""r"uo ru"* FARMEFIS INSUFA OF COMPNNIES @ NCE GFIOUF DENVER, eoLoRADO AUGUST g, 1gg5 EOMMUNITY DEVF:T.NPMENT DEPARJI'I4ENtr TOWN OF VATT.75 6 FRONTAGE ROAD VAIL, co 8155? Lartles and Gentlemcn: T would like to regueat a fr'lrmal extenglon o! my buildlinq permlts "tit..ri:linac perrnt€sr. a'd any per*its rerated t6 lrre-aaoltion to ny buildlns at 22 Bighuru reirice, tzJT ColumUine'lZZ in East VAll.llheee pcrmrts were.lisued AugGa-i 7 | 1gg4. At that tirne r undar-:l"gd.the permits to be gooat tor Z years, bu[-f-*ir:u"t inforrned thar, they are about to eiplre aususi rzr,oi-irri""ii"i. .t |lyg harl dlfflculty^ in _s_ecuring a contractor due i6 the nasrrve buircll'e projecrs .11__rl: vait-ii6a, ana irncl-mi-ir.i".t ir relatrucly sma1l, nlogt gl the contractors have put rne off irnii t-ne_t |€3rr Please send me written confirmation that my permrtr heve bccn extended. Thank you in advance-ioi v"r, consideration. R.espectfu1Iy submltted ; JOYCE \,riATERS SM'TH. LUTCF lfrgLrrirnCe ACnn,iV 7889 W ?0th Drive Aruada, Co g0004 (193) 422-7222 tfnm6 Evsn{nsg ( 303) 752-31 00 Brret nr"i a*i" VaiI property addrcss: 22 Blghorn fc(rase {23? Columbine WeEt Easb VAiI elcte #22 AMEFICA GA\ DI-PhND ON.| FARI\4EBS iC!i(. 3 -drn;iir::ii Cor./l] Sr] fp 11i A ,r,rra,, CO ,iof),| a ll111;1'1s.';.r 7ql-::t:Ofi. Iirx t h:l_:tO:.1 | WATERS SMITII K\,, r lj ft, lann Review nctionit TOWN OF VAIL . , A 7- /7-qq o^t" -1f# -tV Building Name: Project Description:?jf l '/4ut,/+*a, i*er a owner, Addres "^nopnon", -'fryee /tttlerS /7'/ 1176 - (af 3 '/rtl itnf.uo,h,,, y'' , /,,q I .(o fl6i7 , r--{r.11t""&ntact,Addressandphone: 4/aze f)#a /A #//l?- y'/}t Fay V 3f , /'ai/ r? .'f { r Legal Description: tot 2l Block- subdivision 5/? / c r /^ /Zr rr1(e 9"a/ e.r fr ,/zf r4(e zoneDistrict lwJqf Proiect Street Address:fzi *tQ ra{ oL\)qA{ Comments: Board i Staff Action uotionoy: 7o L kn'o-t r votet ?'- d Seconded by: ffRpprouat ! Disapproval ! StatfApproval l,', . 4t,'frd/4 A t9 3-R.tl ) ,r'r=olYit a'r/r/ /tI lle @ Nf (arae/ o a{r/rtfa - tSf4atlr'P t'tF rt' ull ,./c al,11, ( ltctg = F.n/. €t; rZ ara /' *0,r, Yrrl)t y'rrar-Y" ar{rro ,l ft9 hr( ,/r >, /t ./-, {i DRB Fee Pre-paid f ''t " t t,' -.rl ):- f: r-,r t,.,f i i ',. ;,. ...r -,, i i. Galen Aasland said that all new logs would be the same size as Banner Sporls but would be stained with a clear varnish. Bart and Yeti's logs would stay exactly the same as what is out there now. Dalton Williams agreed that Allison's suggestion regarding a copper gutter was a good idea. Allison, Jeff, Bill, Bob and Greg all ielt that the east side roof extension was okay the way that was currently proposed and that it did not have to go all the way to the end of the building. Dalton Williams felt that the roof extension should be redesigned to go all the way to the corner of the building. Dalton also stated that he did not have a problem should the applicant wish to go forward with a possible loading variance, should one be required as a result of the addition. Jim Curnutte stated that the PEC still needed to discuss the pedestrian easement. Mike Mollica asked the applicant whether they would be opposed to a pedestrian easement through the Lifthouse site. Bob Lazier lelt that the pedestrian easement would not change the existing situation, so he did nol have a oroblem with it. Jim Curnutte stated that staff wanted to insure pedestrian access across the site. Mike Mollica stated that it was important for the Fire Department to review this proposal prior to a final hearing before the PEC. Jeff Bowen suggested that a comprehensive sign program be implemented for the building and lhat new tenants be made aware of the program and that the DRB be instructed accordingly. 4. A request ior a setback variances to allow for an addition to the residence located at 4237 Columbine Drive/Lot 22, Bighorn Terrace. Applicant: Joyce Waters Planner: Andy Knudtsen Andy Knudtsen made a presentation per the staff memo. He stated that stafl was recommending approval of the requested setback variances with the live conditions outlined on Pages 4 and 5 of the staff memo: 1. The variance approval shall be contingent upon the DRB approving the "250' reouest. Planning and Envifonmental Commrssion Meeting Mrnutes Augusl 8, t994 Prior to DRB review, the applicant shall redesign the flagstone patio entrance area so that it is located 10 feet from the property line, and conforms to the setback. Prior lo DRB review, the applicant shall amend the landscape plan showing additional landscaping in the northeast corner of the site. The proposed evergreen trees shall measure a minimum of 81 linear feet. Prior to the issuance of a Temporary Certificate of Occupancy (TCO), the applicant shall place the two existing overhead service lines below grade. Prior to issuance of a building permit, the applicant shall provide protective fencing around the three evergreens to the north ot the structure to ensure that they will not be damaged during construction. Steve Riden, the architect for this project, stated that they planned to bury all overhead utility and service lines. The PEC members did not have any questions to ask either the applicant or statf with regard to this proposal. Bob Armour stated that he would like to see the one large tree (located to the north) preserved. Jelf Bowen stated that he had a basic public policy problem with this project. He felt that this was not a proper situation for the PEC to grant a setback variance. He said that he could not find justification for a hardship on the project. The specific problem was that the setbacks were reduced to the point that the neighbor's property would be encroached uoon. Bob Armour made a motion to approve this request for setback variances per the statf memo including the five conditions oullined on Pages 4 and 5 with the additional condition that all overhead utility and service lines be buried and that a 6-foot buffer be provided around the 60-loot tall tree. Bob Armour subsequently withdrew his motion for further discussion concerning protecting the 60 foot tree. Bill Anderson suggested the wording "no structure within the drip line". Andy Knudtsen stated that in order to clarify the condition, that the drip line was less than-the 6 feet as previously cited and the more conservative wording was appropriate. Bob Armour made a motion to approve this request for setback variances to allow for an addition per the slaff memo outlined on Pages 4 and 5 with the following amendment to Condition 4: Planning and Environmental Commission Meeting Minutes ArJgusl 8, 1994 "Prior to the issuance of a Temporary Certificate of Occupancy (TCO), the applicant shall place all existing overhead service lines below grade. In addition, Condition 5 was amended to the following: "Prior to issuance of a building permit, the applicant shall provide protecting fencing a minimum of 6 leet from the trunk ol the 60-foot tall spruce to ensure that it will not be damaged during construction and that staff will field verify fencing prior to excavation. Jeff Bowen seconded the motion and a 4-2 vote approved this request with Dalton Williams and Jeff Bowen opposing this request. Dalton Williams stated that he opposed this request due to the six-foot fencing requirement (for Condition 5) which he felt was arlcitrary. Jefl Bowen opposed this request per his reasons outlined previously. Mike Mollica suggested that the Town's Landscape Architect be consulted prior to excavation on the site. 5. A request for a conditional use permit to allow for an expansion to the administration building located at 1309 Vail Valley Drive/Unplatted parcel localed north ol the l-70 Right-Of-Way, north of Vail Village, 8th Filing. Applicant: Town of Vail, represented by Greg Planner: Andy Knudtsen Andy Knudtsen made a presentation per the staff recommending approval of this request with three stafl memo: 1.Prior to DRB review, the applicant shall add to the landscape plan a cluster of three aspens and four shrubs to the new planter, immediately west of lhe modular building. Prior to DRB review, the applicant shall submit a lighting plan, indicating where the new fixtures will be located and that they conlorm to the Town's standards for lighting. 3. The applicant shall sprinkle the structure in accordance with UBC standards or document that the UBC does not require parking. Dalton Williams recommended that the DRB review the lighting proposed for this project. Planning and Environmenlal Commission Meeling Minutes August 8. 1991 Hall memo. He stated staff was conditions outlined on Page 4 of the 2. 1.45 15 00 51 2 06.00 14s-52 00 C B'c n:e A. Verde 1 100 5-l-.i0 ) 900 06-00 900-13 00 900-53 00 900 51 .00 900 12 00 ,'IOi]EL FINiSH r 45 1 2.1 5 t2.53 165 12 r5 52.53 112 06,52.53 9{10 06.12. r 5,31 ,53 \ I 12C 52 5.1 I r a,, 52.a-1 7 BODY CJLASS WIDTH HEIGHT 00 lTcli(luredl 9 r'r, 5r..'' 00 (Te!t!re(j) 71.:" 4t:'a' irO lC Bev BC.) 6r," 9'/; 03 tcfysia Ci.) 4:j.r Bl.' 40 6j'' 13i:' 40 1t,. I 1 1 20-52 40 TOP TO CTF MAXIMUM EXTENDS OF OUTLET WATTAGE 2./60 t\,1 1 i60-l\'l 7 21,r 1/100M 4"1" 5'r!" 1/60 l\4 i:-i' 7' 1i60 N4 5 5 1i60 1,,4 00'Stanciili-d 00 !:olshed Scild Br,lss 12 I ack AlUnrinLlnr ConslrLrctron 15 \ /friie Alun,if Lrf C l r'rstrlrctrc fr :i0 lf ior--sce|t OLia Grass 51 An1 cirre Verde So[d Brass 52 Classic Verde Solid Brass 53 Weatheisd Frnrsh Solld Brass 54 C assic Bronze C. Ve:Ce * ' .l:i -..* " v'* ":1..'{lt I ||lrli Li ll llj li t4 .*l ,:tl WHT BLK - BODY TOPTOCTR MAXIMUM l4opEl Flrlrs]r qlAqs_ wrplH trEtqHf_ E{rEND€ QEoUTLEI_WaJTAGE !2q q6,59 qo_ _ sA' M,/!: ___ 5"/"' _ __ 81*" __ _,,11100:14 1US _q6-53 _00 t' 1q/{ ___w\,____L41a'______jl1--.-M 1211 !6,53 00 7', 141,4', 1/100-M t I 1293 q6,51 ,00 5y4' 157a" _ -51": _ 8y," _- 1/100-M 00 - Clear Beveled Glass 06 - Polished Solid Brass 53 - Weathered Finish Solid Brass All items on this page are imported. TO: FROM: DATE: SUBJECT: MEMORANDUM Planning and Environmental Commission Community Development Department August 8, 1994 A request for setback variances to allow lor an addition to the residence located at 4237 Columbine Drive/Lot 22, Bighorn Terace. Applicant: Joyce Waters Planner: Andy Knudtsen I. PROJECT DESCRIPTION The owner ol the property described above, Joyce Waters, is proposing to expand half of the duplex by approximately 727 square leet. Most of the addition will occur to the rear and side of the existing duplex. The applicant is requesting variances to the setback standard to allow for the addition. The required setbacks are 20 feet on all sides ot the property and the .applicant is proposing setbacks ranging from 12 to 15 feet. The specific variance requests are as follows: .The front setback is required to be 20 feet and the applicant is proposing 13.25 feet. .The side setback is required to be 20 feet and the applicant is proposing 13.25 feet. .The rear setback is required to be 20 feet and the applicant is proposing 12 feet. .ln addition, there is an entrance patio which would be required to have a 10 foot setback and the applicant is proposing 6-'l/2 feet. To allow the expansion, the applicant has requested to use a portion of the "250". As this is an existing duplex older than tive years, the duplex is eligible for a 250. The Code states that the Design Review Board (DRB) shall review the 250 request after any variance is revievved by the Planning and Environmental Commission (PEC). lf the variance is approved, it should be contingent on the DRB approving the 250. Stafl has provided a condition of approval at the end of the memo stating this. Currently, the owner uses parking spaces located to the south and north of the unit. Two spaces are required with both the current amount of GRFA as well as the proposed amount of GRFA. There is no net increase in the parking requiremenl. At this time, the two required parking spaces are not located entirely on this site. However, since there is no change in the parking requirement, the existing parking situation can continue to function as it does at this time and legally fulfill the parking requirement. There are two separate overhead utility lines which provide service to this unit. The architect has said that, as part of the construction, the overhead lines will be buried. This is a requirement and is listed at the end of the memo as a condition of approval. T There are seven evergreen trees in the area to the north of the structure that may be affected by the addition. Staff believes that it is critical that three of these trees be protected during construction. These include evergreens that are 60 feet, 12 feet and 5 feet tall that have grown in a cluster. There are four other trees which must be cut down. These include 40 feet, 20 feet, 15 feet and 6 feet tall evergreens. There is also one 2-inch caliper aspen which will be cut down. The applicant is proposing to add eight aspen and two lodgepole pine. Staff will discuss the landscaping in greater detail later in the memo. II. ZONING STATISTICS Required/Allowed Proposed Zoning: Medium Density Multi-Family (MDMF) No change Lot Size: 0.0661 acres or 2,879.3 sq. ft. No change Height: 35 feet 25.7 teeL GRFA: 1,007.8 sq. ft. + 225 credit 1,458 sq. ft. + 250 = 1.482.8 so. ft. Setbacks: F ont 20 feet 13.25 teet Side: 20 feet 13.25 f€et Rear: 20 feet 12 feet Site Coverage: 45/" ot 1,295.7 q. ft. 31ol" or 903 sq. ft. Landscaping: 30"/" or 863.8 sq. ft. 44.6/" or 'l,284 sq. ft. Retaining Wall Heights: 3 feetl6 feet 2 feet Parking: 2 existing 2 required Environmental Hazards: None nla III. CRITERIA AND FINDINGS Upon review of Criteria and Findings, Section 18.62.060 of the Vail Municipal Code, the Community Development Department recommends approval of the requested variances based on the following factors: A. Consideration of Factors: 1. The relationship of the reguested variance to other existing or potential uses and structures in the vicinity. The property is within a development that is zoned Medium Density Multi- Family. Compared to the surrounding properties in East Vail, it is a higher density and the residences are closer together than most. With this addition, the distance between this unit and the neighboring units would be 22 urd 28 leet. On a vicinity map provided by the architect, distances between nearby existing structures are shown to be: 1. Bighorn Condominiums to Unit 23: 20 feet.2. Unit 8 to Unit 9 : 14 feet.3. Unit 15 to Unit 19: 18 feet.4. Unit 20 to Unit 21; 15 feet. Staff believes that the proposed distance is consistent with the separation found between existing units in this development. Staff believes the most important issue dealing with the compatibility of the addition to the surrounding properties involves landscaping. The proposed site plan shows lour new aspen to the west, four new aspen to lhe north, and two new lodgepole pines to the northeast. There will be several large spruce trees removed at the rear of this property. Staff believes that the cluster of three evergreens with heights of 60 feet, '12 feet, and 5 feet should be preserved. During construction, the applicant should provide fencing to protect these trees. There are four other trees; with heights of 40 feet, 20 leet, '15 feet and 6 feet that will be cut down. Staff believes that the applicant should be responsible for replacing these trees at a 1:1 ratio. For every linear foot of tree cut down, the same amount should be replaced at the rear area of the site. This would result in a total of 81 linear feet of new spruce trees. The two lodgepole trees shown on the landscape plan may be counted as part of the 81 feet. This landscape requirement has been included as a condition of approval. There is a proposed flagstone patio that will be added in the front area. Staff has recommended that the patio conform to the 10loot setback. At this time, the patio is proposed to be setback 6-112 leet lrom the property line. We believe that the patio could be reduced so as to provide a 10 foot setback from the property line, and therefore not require a setback variance. 2. The degree to which relief from the strict and literal interpretation and enforcement of a specified regulation is necessary to achieve compatibility and unilormity of treatment among sates in lhe vicanity or to attain the objectives of this title without grant ot special privilege. Concerning hardship, staff believes that the method by which the development was originally planed results in a practical difficulty. Property lines were set in such a way that almost all additions to these duplexes require variances. There have been nine setback variance requests in the pasl within this development. In general, staff has supported these variances based on the platting pattern. For this particular lot, the area on-site that is not in a setback is approximately 40 square feet. Since a majority of the site is in the setback area, and since there is available GRFA a variance is warranted, in staff's opinion. 3. The efiect of the requested variance on light and air, distribution ol population, transportation and traffic facilities, public facilities and utilities, and public safety. I There is no impact from the requested addition on the criteria listed above. B. The Planninq and Environmental Commission shall make the followinq findinqs before qrantinq a variance: 1. That the granting of the variance will not constitute a granl of special privilege inconsistent with the limitations on other properties classified in the same district. 2. That the granting of the variance will not be detrimental to the public health, safety or weltare, or materially injurious to properties or improvements in the vicinity. 3. That the variance is warranted for one or more of the following reasons: a. The strict literal interpretation or enforcement of the specified regulation would result in practical difliculty or unnecessary physical hardship inconsistent with the objectives of this title. b. There are exceptions or extraordinary circumstances or conditions applicable to the same site of the variance that do not apply generally to other properties in the same zone. c. The strict interpretation or enforcement of the specified regulation would deprive the applicant of privileges enjoyed by the owners of other properties in the same district. IV. STAFF RECOMMENDATION Staff recommends approval of the request as it meets the criteria as discussed above and, in staff's opinion, also meets the findings. Specifically, statf believes that Finding 1 is met in that the variance is not a grant of special privilege. Other properties in the surrounding development have received setback variances in the past. Concerning Finding 2, staff believes that there will be no impact to public health, safety or welfare as a result of the addition. Concerning Finding 3, staff believes that 3b is met with this request as the platting pattern of the development is an extraordinary circumstance that warrants a variance. Staff recommends approval of the variance with four conditions: 1. The variance approval shall be contingent upon the DRB approving the "250" request. 2. Prior to DRB review, the applicant shall redesign the flagstone patio entrance area so that it is located 10 feet from the property line, and conforms to the setback. 3. Prior to DRB review, the applicant shall amend the landscape plan showing additional landscaping in the northeast comer ol the site. The proposed evergreen trees shall measure a minimum of 81 linear feet. 4. Prior to the issuance of a Temporary Certilicate of Occupancy (TCO), the applicant shall nlacedF+j$Xoverhead service lines below grade. 5, Prior to issuance of a building permitl the applicant shall provide protective . fencingl to ensure that ;+ *nef vif not be damaged during construction.: I c:\pecvnemos\wEters 808 \ - t , . -A ( {+J \4 ,^,''",-.".-. ,l b' 4^A U:7_]1 ,r;q [-lt n fr"^ tl^- f*.-t '{"^"t"1 6 ,.". t-r/ +*;4 r ,t I t D-t f1{ b o, #.( -*.*o-r_:h^_ s/tu4, -\- {1 .. / t -v /$// ->. t ^,/-K _--,/a,/ {a "a \zl3 L -_\ ,[ , _t. = J\..i )r"'z 7,'. \ /<,/ / \*r t (r:','*r.lb[ ---"\.1:1 ttu'-"''/' \\ '\ t. )/ //.// t./ '*ld =-,< 7 >'--z- ''E oY', I I , ,!. I I | -'-| -_- -| ------l--; ,] I I ..-}..-.- lc lz l$ t; @8"-)r 'n rl v, 'n o o 'o qt s <{ r+l(-ti li) l>l- t.\t\tn ll.l! 'N U)o o o a- T o o ! o to ri, a\n --1 o- 'Tl r) '1 z O -1 tr o o, 3r.o ..'. I il () () .r -' -.-\ . ,: l .() /r o a rn o o, \\\\\\ \\ \ \ \ ) I I :. I I l t I rL t t tr r I I -l I I I I I I ti I I t r \ t--_l ll U)o rn o gt o D^A*- tle$ , C"^-".u4 | Mt7-r*"n-'4 h ,- 1 I t v O1 i I I i frt \\ \\\i \\ \\ +,tt n",/--14 ,J. f-lot,--r"l-n- (1 a / t4 /*2,../ /" "4-.^t /-vr(rl -=!m I --.' 0,(t, &sf,' /tt,A,,,t irn E ,1, -*'--E (v 6- l8 A/- {f r3 /lc cr^A; k*t 4) /-^t*-J'--J Itno 7e' Jrfk 4-z bJJ*- & J-#'ry{rr&,J STATE OF ARIZONA STATE COFV DEFAFITIB.IT OF HEATTH SERYICE$ - OFFICE OF VITAL RE@FOS OE^TH NO, CEETIFICATE OF DEATH O IO2. Irsr,Ef i (rir.cE gthhEnt 60I?l l,.I Dav fl 'di+rr . Arveda Dlnser l, .447? E. -taliA ctrcli ,6roh )lolJa 0m - util( AarEqD ttr lrtl'i tl ;rlln olr-t ,t|D |l . cERTtFtFOCOpyOFvtT LRECORO6 ,Ian 2e 1gg3 I ITATIOr^JUZOI{A I .oun,r o, o*rcop,l I o DATE tssuEn t'ltL L I |n/| f,id .c1 ntlrrJoron d thr rhcu'n-i CidrD nerbnd |.|d Crc|d !!t -{4..-!r -0r \'TAL llCOiD! l€(tni/, ffiPrE?u;rrr oF irarrH rlFvrCt€,9r€tlt|l,'|lirr(t|^h d yr.rr f,i |vnicrrq or Ai,t $-Jal|id Dt{rung| Dt +1n l:';re, flarft L tllon ClhtD |'fhrrrdh ' t rrtc.X CrW t'.lrf_t C Hi|Xt ldhr Tbh eopt nut rrlid uDl D{lDrfid o! rtGflrd !{f{rr ditpbtlnl courty $rl b colot tuC nbrd l|rl ol l$rint,trnql GORDON ELLERY STR Marieo Phoenix 2431 S. 47rlr Plsce 4472 E, Lrake Circlc N fr runk i_tl stlqf !- crenatory' Pel: ,li , - DiJl l0 l|G c l4ti rAtED. iff,$iiFf', iiffi tr** lffiffr E,*.*".. tr*Stsr", |furEl a +@ Sing1e Family Residence, Duplex, ZONE DISTRICTS Primary/ gecondary DATE: iV".",f t .qo LEGAT DESCRIPTION: LoL ZZ sl-ock - Subd,iwision ADDRESS i 4z-'t / (a-{4a*./a \. ',).--OWNER a)., ttu: PHONE ARCHITECT PHONE 1'/? ?t4 r ZONE DTSTRICT PROPOSED USE /h Ont F LOT SIZE ^Jl, h,,n , abh/ a c r<,<--BUII,DABIJE I-,OT AREA Z 6 f g' 3 z 6-n.3 E Allowed Existinq t30ffi)3/ Proposed Total 4reiqhr. f-tzf rotat GRFA.3t Ixi+.arfr4RFA se€ondary GRFf, E= Setbacks Vl" "' /047.Y 73t 7z-1 pL., z;v Ezl ---17&!"2s = i4\z,K Hst (@ 425 = Front si-des Rear -ffi. 7<-, # z.<,fr' z-> I z1t,1 tt" 3,8 1,,la, 7 neqrd t?2.f t3.2! / t2 Qot lz64 Z' o-- o"z EncI Slope % NO No___ ,.- -2,?f,2' l- S ,1w. c- /Ztr < .!rll, n-g",rl /"--^ /*-/ ) ,;o-1 ? *r*,-$*) ''t (,t..t-r!"",., r",, ^ --ff'#. c,--*, z.-,f -a-,tuc.r^;5-a .1 I 1 /Je L"z",< -y'n (,-,/-C, s. "< 4rtu Coverage {g 1. rdandscaping 3a'/ "ddc.inins wall Heights @narx.'g {z en'i'>'i c{ '4'c.'*o,I &uq" Credit &iu"' rv, L permitt.ed slope % proposed tr-Compties with T.o.v. LighLinq Ordinance yes qdSfer Course SeLback -do f inish Grades Exceed -f6f,i ronmen ta1 /Hazards : ak 'll z) 3) {/iew Corridor Encroachment: yes . -Z^-- L.r-.: - *--..-.-r.'-noea E.rirs reqrieSl invOive a 250 Adtircrorr? =9,ffinow much of the allowed 250 Addit,ion is useE-lFffi-EEis requesE? AEJ ,y'revious conditions of approval (check property f ile) , ---,,..-o L Nr-l 1"1{u L,t'r- (300) (600) (900) (1200) 4/z\ Flood Plain Percent. Slope (< Geologic Hazards YEs a E rfu_ag_\--- > 30%) ^-<->+<\- a) Snow Avalanche b) Rockfall c) Debri-s Flow 4 ) Wet.lands o OPPENHEIMER Return to Andv Knudlsen Town Planner INTER-DEPARTM ENTAL REVIEW PUBLIC HEARING a DD 7.t2,Xq: 151nr5 rlir\in tlr6 r€,quic€cl*f t<tcfs? lr,re1 rxzds 16 6gr,Jd,<l ,io, *,-*ttt 5 ar € Y'\')t\\ <^>S*rr\ dciv q ' L)eed ?f("po sed ctrrt<r cq hx .<tte derrerogrdt \ ' kqcosea * t** i * ** 6c \ro\t\ on\\s. \s \t6e < drornc<1e gron3 q166ec o.g9or5 to dccs't Is luc,..,zJ )arb'n P*t o't't' k I Cor',f v;cJ,rr t\T,i Fire Dept.: Reviewed by: Comments: TO: MIKE McGEE PROJECT: DATE SUBM COMMENTS NE BRIEF DESCRIPTION OF THE PROPOSAL: 1l20 lq4 GREG HALL a.dl";$'4a ifb udv ep4 Engineering: Reviewed by: -Iern Pals; Comments: Landscaping: Reviewed by:Date: Comments: Date: Distributed to the Fire Department, pubtic Works, and Landsc ^OinS mqtJfulJ{ MIKE McGEE GREG HALL TODD OPPENHEIMER Retum to Andv Knudlsen Town Planner INTER-DEPARTM ENTAL REVIEW a,{l;/'iat\ rgb *dy ep4 Engineering: Reviewed by: Comments: Reviewed by: Comments: Comments: BRIEF DESCRIPTION OF THE PROPOSAL: Landscaping: Date: Date: Fire Dept.: Nr 'r7 r, 1 Reviewed by: l)\o^'"^' Dale. 1'a I 'qq sbf *- Distributed to the Fire Departmenr, pubtic works, and Landsca el^s ^ -il lUl ?/ . I coMMEr'tJi;fiF'", J z-zq . oq Wt' 4 Engineering: Reviewed by: Comments: Reviewed by: Comments: Fire Dept.: Reviewed by: Comments: TO: MIKE McGEE PROJECT: DATE SUBM BRIEF DESCRIPTION OF THE PROPOSAL: GREG HALL TODD OPPENHEIMER Return to Andv Knudtsen Town Planner INTER.DEPARTM ENTAL REVIEW HEARING a,&l;$'a1 ttb ud\J en4 Date: Date: Date: Landscaping: Distributed to the Fire Department, pubtic works, and Landsc ^vino onltJ-?lJ{. O uPDATED 4/zL/s4 Title lli ZONINGl Chapters: I 8.02 General Provisions 18.04 Definitions 18.06 Districts Established 18"08 Zoning Map f 8.09 Hillside Residential (HR) District 18.f0 Single-family (SFR) District 18.12 Two-family Residential (R) District 18.13 Primary/Secondary Residential District 18.14 Residential Cluster (RC) District 18.16 Low-Density lr{ultiple-family (LDIUF)District 18.18 Medium-Densit-v Multiple-family (MDMF)District 18.20 High-Density Multiple-family (HDMF) District 18.22 Public Accommodation (PA) District 18.24 Commercial Core L (CCl) District 18.26 Commercial Core 2 (CC2) District 18.27 Commercial Core 3 (CC3) District 18.28 Commercial Service Center (CSC) District L8.29 Arterial Business District 18.30 Heavy Service (HS) District 18.32 Agricultural and Open Space (A) District 18.34 Parking (P) District 18.36 Public Use (PUD) District 18.38 Greenbelt and Natural Open Space (GNOS) District 18.3 9 Ski BaseiRecreation District 18.40 Special Developrnent Districts 18.52 Off-street Parking and Loading 18.54 Design Review NOTE Foourotcs rrc numbcrcd throughout thc tert and rrc located ar the end of this rirlc. 299 (vail 9-29-92) ZONING Chapters: 18.56 Environmental Impact Reports 18.57 Employee Housing 18.58 Supplemental Regulations 18.60 Conditional Use Permits 18.62 Variances -. 18.64 Nonconforming Sites, Uses, Structures and Site Improvements 18.66 Administration 18.67 Vested Property Rights 18.68 Annexed Areas 18.69 Hazard Regulations . 18.71 Additional Gross Residential Floor Area 18.73 View Corridors (vail 9-29-92) 300 ZONING 18.18.080 Height. 18.18.090 Density control. 18.18.110 Site coverage. 18.f 8.130 Landscaping and site development. 18,18.140 Parking. f 8.18.010 Purpose. The medium-density multiple-family district is intended to provide sites for multiple-family dwellings at densities to a maxi- mum of eighteen dwelling units per acre, together with such public facilities as may appropriately be located in the same district. The medium-density multiple-family district is intended to ensure adequate light, air, open space, and other amenities commensurate with multiple-family occupancy, and to maintain the desirable residential qualities of the district by establishing appropriate site development standards. Certain nonresidential uses are permitted as conditional uses, and where permitted, are ' intended to blend harmoniously with the residential character of the district. (Ord. 37(1980) $ 6 (part): Ord. 30(1977) $ 5: Ord. 8(re73) $ 5.r00.) It.f 8.020 Permitted uses. The following uses shall be permitted in the MDMF district: A. Single-family residential dwellings; B. Two-family residential dwellings; C. Multiple-family residential dwellings, including attached or row dwellings and condominium dwellings. (ord.8(1e73) $ 5.200.) 1t.f 8.030 Conditional uses. The following conditional uses shall be permitted in the MDMF district, subject to issuance of a conditional use permit in accordance with the provisions of Chapter 18.60: A. Public utility and public service uses; B. Public buildings, grounds, and facilities; C. Public or private schools; D. Public park and recreation facilities; E. Ski lifts and tows; F. Private clubs and civic, cultural and fraternal organizations; 332 ffail a.7-92) o I.jM.MEDI DENSITY MLJLTIPLE-FAMILY WDtvf) DISTRICT G. Dogkennel; H. Bed and breakfast as further rcgulated by Section 18.58.310;I. Tlpe III EHU as defined in Section 18.57.060; J. Type IV EHU as defined in Section 18.57.070. (Ord. 8(1992) $ 17: Ord. 31 (1989) $ 5: Ord. 20(1982) $ 5: Ord. 37(1980) $ 6 (pan): Ord.17(1976) $ l: Ord. 8(1973) $ 5.300.) 18.18.040 Accessory uses. The following accessory uses shall be permined in the MDMF disrict: A. Private greenhouses, toolsheds, playhouses, attached garages or carports. swimming pools, patios, or recreation facilities cusomarily incidental to permitted residential uses; B. Home occupations, subject to issuance of a home occupation permit in accordance with the provisions of Sections 18.58.130 thrcugfi 18.58.190; C. Otheruses qstomarily incidental and accessory to permiued or conditional uses, and necessary forthe operation thereof. (Ord. 8(1973) $ 5.400.) 18.f 8.050 Lot area and site dimensions. Thc minimum lot or site area shall be ten thousand square feet of buildable area, and each site shall have a minimum frontage of ttrirty feet. Each site shall be of a size and shape capable of enclosing a square area eighty feet on each side within its bounduies. (Ord. 12(1978) $ 3 (part).) 1t.fE.060 Setbacks. In the MDMF district, the minimum front setback shall be Menty feet, the minimum side setback shall be twenty feet, and the minimum rear setback shall be twenty feet. (Ord. 50(1978) $ 2 (pan).) 333 (veil 9-29-92) \ZONING 1E.18.0t0 Height. For a flat roof or mansard roof, the height of buildings shall not exceed thirty-five feet. For a sloping roof, the height of buildings shall not exceed tfrirty-eight feer (Ord. 37(1980) $ 2 (part).) 18.18.090 Density control. A. Not more than thirty-five squarc feet of gross residential floor area (GRFA) shall be permined for each one hundrcd square feet of buildable site area, provided however, that single family and two-family dwelling units constnrcted in the Medium Density Residential District shall be eruitled o an additional two hundred twenty-five square feet of GRfA per corutructed dwelling unit. B. Exemptions. All projects that have rcceived final design rcview board approval as of December 19, 1978, sttalt be exempt from the changes in this section as long as the project commences within one year from the date of final approval. If the projea is to be developed in stages, each stage shall be commenced within one year after the completion of the previous suge. (Ord. 16(1991) $ 3: Ord. 19(1979) $ 5 (pan): Ord.50(1978) $ 18 (part).) 18.18.110 Site coverage. Site coverage shall not exceed forty-five percent of the total site area. (Ord. 17(1991) $ 5: Ord. 8(1973) $ 5.507.) 18.18.130 Landscaping and site development. At least ttrirty percent of the total site area shall be landscaped. The minimum widft and lengrtr of any area qualifying as landscap- ing shall be fifteen feet with a minimum area not less than three hundred square feet. (Ord. 19(1976) $ 6 (part): Ord. 8(1973) $ s.s09.) (Vail9-29-92) 3y \*&-o*slry MLJLTI'LT-.^# GrDtvF) DISTRICT 18.18.140 Parking. Off-sueetpa*ing shall be provided in accordance with Chapter 18.52. At least one-half the required patking shall be located within the main building or buildings and hidden from public view or shall be completely hidden from public view from adjoining properties within a landscaped berm. No pa*ing or loading area shall be located in any required ftont setback area. (Ord. 19(1976) $ 6 (pan): Ord. 8(1973) $ 5.510.) Chapter 18.20 HIGH.DENSITY MULTIPLE.FAMILY (HDMF) DTSTRICT Sections: fS.20.010 Purpose. 18.20.020 Permitted uses. f8.20.030 Conditional uses. ft.20.040 Accessory uses. 1t.20.050 Lot area and site dimensions. 18.20.060 Setbacks. r8.20.080 Height. 1E.20.090 Density control. 18.20.1l0 Site coverage. 18.20.f30 Landscaping and site development. 18.20.140 Parking and loading. 1E.20.010 Purpose. The high-density multiple-famity disuict is intended to provide sircs for multiple-family dwellings at densities to a maximum of twenty-five dwelling unis per acre, together with zuch public and semipublic facilities and lodges, private recreation facilities and relarcd visitor-oriented uses as may appropriately be located in the same district. The highdensity multiple-family district is intended 335 (vril9-29-92) furnoo AcP*?.rs 303 355€591 Bighorn Terrace Association c/o Ralph Turnbull, Sec'y 558 South Pontiac Way Elenver, CO. 80204 Adjacent property ownerg Bighorn Condominiums€ldg B c/o Dorothy Banks Sec'y 4207 E. Columbine Drive #6 Vail, GO. 81657 unit 21 Bighorn Terrace Neal Llewen 1102 North Dubuqe lowa City,lA 52248 unit 23 Bighorn Tenace Francis & Sharon Gasanova 601 Apache Drive Wakefield, Ml. tt9968 unit 16 Bighorn Terrace Thomas Engleby 231 4 E. Briarhurst Drive Highlands Ranch, CO. 80126 Lot 20-4 unit A Bighorn Subdivision Patricia R Kilstoff 4256 Columbine Drive Vail, CO. 81657 +trol q4 - zw rDflcc,' clryac-trn's v;lt a,rf Sx ,J lar f n 4 \nlm-nc.D OcHacLr$-s SLr-tr CIrL-f ,.. ,dU Lot 20-4 unit B Bighorn SubdMsion Richard & Carole Beewick 315 W. Mariposa Drive Redlands, CA 92373 Lot 2O5 Bighorn Subdivision A C Stormo /Herbert Mooney 1207 Gollyer St Longmont, CO. 805{rl PUBLIG NOTICE NOTICE lS HEREBY GIVEN that the Design Review Board will be reviewing the following appfication on August 17,1994 in the Town of Vail Municipal Building, 1. A request for an additional 250 square feet of Gross Residential Floor Area for an addition to the existing Waters Residence located at 4237 Columbine Drive/Lot 22, Bighorn Terrace. Applicant: Joyce Waters The applications and information about the proposals are available in the zoning administrator's oflice during regular office hours for public inspection. TOWN OF VAIL COMMUNITY DEVELOPMENT Published in the Vail Trail on July 22, 1994. THIS ITEM MAY EFFEGT YOUR PROPERTY PUBLIC NOTICE NOTICE lS HEREBY GIVEN that the Planning and Environmental Commission of the Town of Vailwill hold a public hearing in accordance with Section 18.66.060 of the MunicipalCode of the Town of Vail on August 8, 1994, at 2:00 P.M. in the Town of Vail Municipal Building. In consideration of: 1. A request for a setback variance to allow for a new residence at 5128 Gore Circle/Lot 4, Block 3, Bighorn sth Addition. Applicant: Ghislaine de Teronanne de Fernandez/represented by Duane Piper Planner: Andy Knudtsen A request for setback variances to allow for an addition to the residence located at 4237 Columbine Drive/Lot 22, Bighorn Terrace. Applicant: Joyce Waters Planner: Andy Knudtsen 3. A request for a worksession to review a CCll exterior alteration, site coverage variance, and a setback variance to allow for a commercial expansion to the Lifthouse Lodge located at 549 West Lionshead Circle/Lot 3, Block 1, Vail Lionshead 1st Filing. Applicant: Bob Lazier Planner: Jim Curnutte 4. A request for a setback variance and an amendment to a previously approved plan to affow for four duplexes lo be constructed al 1894 Lionsridge Loop/Lot 27, Block 2, Lionsridge 3rd Filing. Applicant: SteveGensler/ParkwoodRealty Planner: Andy Knudtsen 5. A request for a conditional use permit to allow for an expansion to the administration building located at 1309 Vail Valley Drive/Unplatted parcel located north of the l-70 Righi-OtWay, north of Vail Village, 8th Filing. Applicant: Town of Vail, represented by Greg Hall Planner: Andy Knudtsen 6. A request for a conditional use permit to allow lor the expansion of the Vail Golf Course Clubhouse for new Vail Recreation District office space to be located at 1778 Vail Valley Drive/Part of the north 1/2 of Section I, T 5 S, R 80 W, 6th P.M., Town of Vail, Eagle County, Colorado. Applicant: Vail Recreation District, represented by Bill Pierce Planner: Jim Curnutte 7. A request for a worksession for a height variance and a major exterior alteration to the L'Ostello building located at 705 West Lionshead Circle/Lot 1, Block 2, Vail/Lionshead 3rd Filing. Applicant: Alien, Inc./John Dunn Planner: Randy Stouder t' ,,,, UT|I DEPI ttra-il.EgjlldlsstJ&lJgr ; ,l i' r_'r?prfty Ir drrcrlbcc bv a jrrrrlFilon, Flar;r providi cr 5*3, .r C;:'j - ::j-* s*FE:.n!*- rb A rL,j rf t.ch to f,hli rpplibrtlon, L3'r aqgg; I! rlgu1redl It d Fbld SUrv€l' 61eUI;1q E?F.l lclnr lot trrr. I:AVE .F A}F.LICATIT: tlu t ' t,l;,1^ntt t6,i Flrrig lJh\,: 0F Hr i .i. lnf +' -t - .-.. r--*. i I .t 1. 1l.ir{. ill :.. Et ltlr.tE 0F oL${ER_r:' ' -.1:,.La{ r8:cllltBlE lti : _-Hri llnqpiFC --*. ...-la j:J -:' ', r::= 5 CenCdrnlrl un ipy !\r : if . .' rubrr::ii Ji': r l:nli .,8:. :f p,:idat Lsler, Hl.,..Fth,DF.e "rqE, DR! f *, ,.. er Bha.. ti 1:-:q :._rr a brll(tlng F.i: . '.r*Ar; -L l ly t,hr a. - r 0:t r'!lurtjtn sf the .,r ti,-Elt . , .. 1.,"n'lf "filf f :::,1-:rJI:r_:l:_ i:*,r!rxr ;!ca' "l-, --n,"r., *"i*iii, "i tnS.rrrG thc =er;e_-t ftr r prr., Flg,S,rFErir;.; rrlLr.'AiJ0tl $ 0-l ' tt,ec: ; :..i .a int t 1q^- aCv t ilt.,t]l * I 1t.,I t ',1 A. r r gr ' r,:i .| -I Cver ! I.Ir.-?Jtr!i-*l , RfVlfr !O3ltf- :. = ,-" . i:i:l4ii:0. UUU t R' 'l | ,! !' ^itl trt r. u . uti Yf.l,l rtrt* ftiv\l '; 14 r I i4 '] 'd ; l { I * Dlsrc$ FE[!i!rEt] Fi: tl lI It Dlt ltDlrqrltot{ - 1lqnt Ot 16rl, Dnrg app11*^TteN ftf(!tygp1 D,rtl 0r DRt lil,lTln6t aattaatraf ?Itt rtFlrelTtotl ItLt/ xgr tl t,ect|,r 1't sfftlL l&L tfggrtltr . . .r.Tj#jr^ o i' ri*i#l r.uU . I o DESCiIF?IT}tI \.. , ?YFE OT REVIT!{r litH Ccnltr'-ie:{$n ($?00,00} -_ttinnr n.-:rflrlon (f20,001 Adrlitlcn f950,001 .t-,+--i=! .i; Et-r,r -.r ,,.A\\,-iit.vrr re)v,vsr , _lca:ra- l*i RtVlrw ($0)rj,FREs$, {t*1. 4{l'*'h,rc.,rC- l';AL DISCFIPTION? : h. *",- Lt" +l-*--.. - nitl:r ' r 1 r'.I rl nnT-gb,rlk:JliC__ ,r/ al)L-. Ac P' j -.1,r.,T , Asl. t:.t : P. t lr a Jt-r 4;i :e :.riee JT=,.-r.i -.'.--= .O., ii- :',- ,-: rfvlrrd lg/0172 ApFl lca?lor, F[,C t{EEtIr{{} E.z=4J tEZ t {i cat r DA ','s r i. 4nir , Thi eFFl Je ri. Lon ui i i n.,ri b4 at:cep !r fornlit {on 1r tubmlttrd, trJ A, ir.33!g, rlF ipFLreAHr_.JItq \J-0ltil _ AD DF E s I -414*G[,.+j*lli{-j- --r--lltot'le AFB LICIHT' 3 REF REIS}JTATiift-. +'' -qlili.o,TrjRE{3) / \ts4 GI"*tt Led urtii a!L i;A.|lE 0F r..:,.l,r.J3 S '. 1r :F :1.ir'-P rS' .-.i-iEi4c ra.r I /il-------d (o . - -FHO1E /41(r.d6/a :.:i;,T!Oir -t: FRi}F'i5Ai, tF,-.tL F=.qcp.iFtlirit : sLOeK- rtlrlr€3kA Ar.l'RE3s. qz tr FEE 9250.00 FArF.,.-,__. ,...f,r{ i__ey jlJ! lll_W!4_BE FA1D BEFrr.E IilF c4nHrrr.rJry FE.,rEL+b-r.rEi:r :FF ;.FTMI.Ni l{1 !-I- .EaCf,PI f 0{i. b=F.rFCS},_ F gtt-Fad, addreasll e;rvtl:p=:r +:- Lh€ ,r;rirrjs -,i ._;ij::g.. :::ll. i::tg"t-:l - a!t::.?' : ic l_he ri::jrcr p.ope,t; :*:Ji ,1.>./;Fi).i:;)3FTy Brlilii.:r iiiF Lilr_ra< si;rEi+5, ei,r i ;.r =8, +t -.,,o., ,i1?€9 0r.r1 mal I tn,f r.1dr+5i!85 , TilE AFpLICLtiT i*:L.i. FE FE!it'l',$:BLE f$F fliRFeCT t{,6,:i,i};{ ftf,DRES as A pr+'apil lcrtlon cenferenee. r,:JtF, -* gllnning 6r_af f rlrr.,!)s r !s :i::,1:ly. s(jggested '.e rJ.{t-ss6{1e il any ,rJdi;ia;;i rri3e.",5r:ol"i rs ncarjed. H6 sF,Fi.ir*"-rrir.,ri ii-ur.'Ii,-optr,-.i ::1n:i, i! t? .ernt]*',i (,r,*at l;qi;;;-;i. 1;€;lif !Gq;:rrc h,,'ls r*nirr! ,iin] rlrrrfrrnri . rr 1s .,i1€ "rpiifJ"i;;----" '', :::F:i:j'l1ll!f 'o hrkr rn appolrrrmen:..,,r111 rhe reaff ro rinrl :r.ri !rcrjr- f dilltlcaai subnit-til requirtnen!A, ptE}"se ucTE THnr A.$q*lIIr-iFFi j{j*?l*}: i{il_t S.tREA}!L:},,E rfiE AFFEil'.'r:L FRriE$ g n cF, TEFFR:,.. . - : -ili =is.'REAs r N€ rEe -iintEER It. t':i.rr;?icNs oF ArrFOVAL TH,r.T se-rii:;x:r.lc lnn Et:i'lRnriteE''JTAl, igttri_cgiC:r raili r.*] iii;,,:i,rrc ALr.: ,ll:D'TI'.rljE OF []pp_s1i;_r11 ]'UST Bf r",cs: iai *!^,; ppffi, g,er.::LFtil{- Fgzu4IT IS r6$U&n Et)l:R lli CCFIEi DF rH* Far i;_i.:, ..., 1UlT gg SUB1.{ITtgrji !.. ,E r.rF.iltEt4 $TATgSEir?. r_,i Tr[, iREii$s N*TURn 0r THE vAFIiltJeE p,Fe-L;;.:TEL. r\r1o TXE p.eeU:-ir:tlr il.vgfilsi'.- rr"ETITEMETTT HUs,r [LSO aODREiS; --"." l. lhe rclerlonrhlp of r-he rsquorred vsrianco lo l0tr94ril6{ ?.lt,l9ed grIJ 6?f !/L 'Kl' rl #g>'{f{4 Rtcf t?€0 Ffiufl 1 . r?vir.d glllgL cotpRADo IPP'.ICTIION - TOTfN OF \Tf,II,, DATE APPLICATION RECEI\IED : DATE OF DRB MEETING: rars rPPLrcmfi;;;;iiot "" AccEPTED UII1IIL tI.L REQUIRED INFORI.IATION IS SI'EIIITfED rr*tlt*tl* r.@:I rr | |A. DESCRIPTION: Add,TIA^ tO D. Subdivisiod ff property is described by description' please provide attach to this application. ZONING: LOT AREA: ff reguired, applicant stanped survey showing lot area. NAI,IE OF APPLICA}IT: ess:, otr NA}'1E OF Mailing APPI] -lprl, B.TYPE OF REVIEW: New Construction ($200.00)Minor Alteration ($20.00) Conceptual Review ($0)X Addition ($50.00)il -o*rr, Mzl Gbn'h ndD.r14 a meets and bounds Iegal on a separate sheet and a current I. rl NAl,tE oF owNERs: la.lu LtJ,il.prc RESENTATI*,@ $ 20.00 $ 50.00 s100.00 s200.00 $400.00 ss00.00 Ad T I. *SIGNATI'RE (S) :Mailinq Address: Condoniniun Approval if applicable. DRB FEE: DRB fees, as shown above, are to be paid at the time of submittal. of DRB application. Laterr when applying for a building permit, please identify the accurate valuation of the proposal. The Town of Vail' will adjust the fee according to the table below, to ensure the correct fee is Paid.FEE PAID; S _ FEE SCHEDULE: VALUATION $ 0 - $ 10,000 s 10,001 - $ 50r 000 s 50,001 - $ 150,000 $150,001 - $ 500,000 $500,001 - $1r 000,000 $ Over $1,000' 000 * DESIGN RE\'IIEI{ BOARD APPRO\'AI. EXPTRES OITE YEAR ||FIER AINII. APPRO\TAI UNI,ESS A BUI'.DING PERMIT IS ISSI'ED tlTD CONS!RUCTION IS SIARTED. ITNO APPI,ICATION }'ILL BE PROCESSED NIIBOST OWNER'S SIGIIA,:IURE provide D TT III A pre-application meeting with a mernber of tbe planning st;ff i!- strongly encouraged to determine if any additional application information is needed. It is the applicant's r-sponsibility to make an appointment with the staff to determine if there are additional submittal reguirements. Please note that a COMPLETE application will streamline the approval process for your project. In addition to meeting subrnittal reguirements, the applicant must stake and tape the project site to indicate propelty lines, building fines and building corners. AII trees to be removed must be taped- AIt site tapings and staking must be completed prior to the DRB site visit. The applicant must ensure that staking done during the winter is not buried by snow. The review process for NEW BUILDINGS normally requires two separate meetings of the Design Review Board: a cotrceptual approval and a final approval . APPlicants shoulb plan on presenting their development proposal at a minimum of twb rneetings before obtaining final approval . Applicants who fait to aPPear before the Design Review Bblrd on their scheduled neeting date and who have not asked in advance that discussion on their item be postponed, will have their iterns removed from the DRB docket until such time as the item tras been republished. The foflowing items may' at the discretion of the zoning administrator, be approved by the Community Development Department staff (i.e. a formal hearing before the DRB may not be required): a. Windows, skylights and similar exterior changes which do not alter the existing plane of the building; and b. Building addition proposals not visible from any other lot or public space. At the time such a proposal is subrnitted, applicants must include ietlers from adjacent proPerty ohtners and/or ftom the agent for or manager of any adjacent condominium association stating the association approves of the addition. If a property is located in a mapped hazard.arg? (i-e. sno* lvalanche, rockfall, flood plain, debris flow' wetland, etc)r a hazard study must be submitted and the owner must sign an affidavit recognizing the hazard report prior to the issuance of a building permit. appficants are encouraged to check with a Town Planner piiot to DRB application to determine the relationship of the properEy to all mapped hazards. For all residential construction: a. Clearly indicate on the floor plans the inside face oi the exterior structural walls of the building; and b. Indicate with a dashed line on the site plan a four foot distance fron the exterior face of the building wal]s or supporting colunns. If DRB approves the application $tith conditions or modifica"ions, all conditions of approval nust be resolved prior to Town issuance of a building permit A. F. rV. NEW CONSTRUCTf, Three copies of a recent topoglaDlig::surYgy, stStlped bv ffil'rirll#:r:l 1" n,3Sioll rarser' 1. Lot area. 2. Tvro foot contour intervals unless the parcel- consists of 6 acres or morer in which case' 5' contour intervals may be accepted' 3. Existing trees or groups of trees having trunks with diimeters of 4" or more, as measured from a Polnt one foot above grade' 4. Rock outcroppings and other significant natural features (liige-boulders, intermlttent streams' etc. ) . 5. Hazard areas (avalanche, rockfallt etc')r centerlineofstreamorcreek,required.creekor stream setulcrl-1[[-year flood prain and slopes of 40* or more' if aPPlicable' 5. Ties to existing benchmark, either USGS landmark or sevter invertl This information shou]d be clearly stated on the survey so that. t1l,-- measureme"t"-".. based on the same starting point' This is particularly important for height measuremer,.i.--See iolily On Survey Information, for more infornation regarding surveys' 1. Locations of the following: a. Stze ana type of drainage culverts' swales' etc. must be shown' b. Exact location of exisEing utility sources and proposed service lines fron their source to the itructure. Utilities to include: c. Show alL utility meter locations, including any pea-siars t6 be located on site or in the riinl-oi-way adjacent to the site' Revocabre peimits trom tne Town of Vail are reguired for inprovements in the right-of-way' d. Property lines - distances and bearings and a basis of bearing nust be shown' e. AlI easements (Title report.must also include FsElng easement Locations) 8. Existing and finished grades' 9. Provide spot elevations of the street' and a minimum or one spot elevation on either side of tne ]ot, 25-ieet'out from the side ProPerty fines' Site Plan 1. Locations of the following: a. Proposed surface drainage on and off site' b. Proposed driveways. Percent slope and spot elevations must be shown. 2. A11 existing improvements including structures' tinascaped ireas, service areas'. gtotag:^1f1""' walks, -driveways, off-street parkingr- I'oadlng areas, retainiirg'walls (wittr top and bottom,of wall spot eLevafions), and other existing site improvements. A. Cab.le TV Telephone Sewer Water Gas Electric E. and proposed qrades shown underneath) . These elevitions and grades must be provided in order existing grade elevations. 4. Driveway grades may not exceed 8* unfess approved by the fown Engineer. Landscape Plan (1r = 20' or larger) - 3 copies required 1. The foflowing information must be provided on the landscape plan. The location of existing 4" diameter or larger'trees, the location, size, spacing and type (common and latin name) of all existing and proposed plant material. All trees to be saved and to be removed rnust also be indicated. The plan must also differentiate between existing and proposed vegetation. 2. Complete the attached landscape materials list. 3. The location and type of existing and proPosed watering systems to be employed in caring for plant naterial followi.ng its instaJ'lalion. A. Existing and proposed contour lines. In order to cfarify the inter-relation of the various development proposal eomponentsr please incorporate as rnuch of the above infornation as possible onto the site p1an. Siqn off from each utilitv conpanv verifying the lbcation of utility service and availabitity (see attached) . A preliminarv title report must accompany all suEmftt.als, to insuie property ownership and location of -4L easements on Property. Architectural Plans (1/8" = 1' or larger, l/4" ls preferred scite ror review) 3 copies requi-red' 1. Sca1ed floor plans and all efevations of the proposed development. Elevations must show both existing and finished grades. 2. One set of floor plans rnust be "red-lined" to show how the gross residential floor area (GRFA) was calculated. for the staff to determine building hei.ght. All ridge lines should be j-ndicated on the site pIan. Elevations for roof rJ.dges sha1l also be indicated on the site plan with corresponding finished and Reductions of a]} elevations and the site plan (8- 1,/2" x ilu) for inclusion in PEC and/or Town Counci.I memos maY be requested. 4. Exterior surfacing materials and material colors shalf be specified on the attached materials list. This naterials List must be completed and subrnitted as a part of DRB application. Co.Ior chips, siding sanples etc., should be presented to the Desi.gn Review Board meeting. Zone check list (attached) must be completed if pro;ect is located wlthin the Single-Family, Primary/Secondary or Duplex zone districts. Photos of the existing site and where applicable, of adjacent structures. NOTE: l\ F. tt The zonir?Administrator and/or DRB Qv t"eoire the submission of additional plans, drawings, specifications, si*pres ana otirer mdterials (inciuding a'rnodel) if deemed irecessary to determine whether a project will. comply with Design Guidefines ' Photos or sketches which clearly convey the redevelopment proposat and the location (site ptan) of the redevelopment broposaf may be submitted in lieu of the more formal ieguirements set forth above, provided all important specifications for the proposal including colors and materiafs to be used are subnitted- VI. ADDI?]ONS - RESIDENTIAT OR COMMERCIAL A. Original floor plans witb aII specifications shown' B. Three sets of proposed floor plans !/8n = Lt or larger (I/4" = I' is Preferred) C. Three copies of a site plan showing existing and proposed construction. Indicate roof ridge elevations with existing and proposed grades shown underneath' D. Elevations of proposed addition. E. Photos of the existing structure' F.specificationsforallnaterialsandcolorsampleson materj.als list (attached) . AtthereguestoftheZoningAdrninistratoryoumayalsobe requj.red to submit: G. A statement from each utility verifying location of service and availability. See'attached utility location verification form. H. A site improvement survey, stamped by registered professional surveYor. I. A preliminary title rePort, to verify ownership of Property, which lists al] easements ' vrr.@. once a building perrnit has been issued, and construction is underway, ""a 6"?ote the Building Department will schedule a frarning- i""p""ilon, t"o copies oi an- Inprovement Location Certiflcate survey (rl,c) stamPed by a registered frofessional engiieer must be submitted. The following information must be provided on the ILC: Building Location (s) with ties to ProPerty corners' i,e. distances and angles. B. Building dinensions to the nearest tenth of a foot All utility service line as-builts, sfrowing !yP9 of material uled, and size and exact focation of lines' Drainage as-buiIts. Basis of bearing to tie to section corner' AI1 property pins are to be either found or set and stated on imProvement survey. A11 easements. Building floor elevations and afl roof ridge elevations with exj.sting an- proposed grades shown under the ridge lines . n H. VIII Submittal requlrements: The. owner or authorized agent ffiy foiect ieguiring design aPprovar as prescribed by this- chipter may submit Plans for conceptual review Uy tne Design Review Board to the Departmelt of C6mmunity Divelopment. The conceptual review is -.intended to give the applicant a basic understanding of the compatibility of their proposal with the Town's Design -Guidelinel , This procedure is recornmended prirntrily for applications more comPlex than -single-iamily anO tto-lami.Iy residences. However, developers of siigJ.e-family and two-family projects shall not be exclud5d fron the opportunity to reguest a conceptual design review. Comliete applications must be submitted 10 days prior to a scheduled DRB meeting. The following information shall be submitted for a conceptual review: 1. A conceptual site and landscape plan at a minimum scale of one inch eguals twenty feet; 2. ConcePtual elevations showing exterior materials and a description of the character of the proposed structure or structuresi 3. Sufficient infornation to show the proposal complies with the development standards of the zonb district in which the project is to be located (i.e. GRFA, site coverage calculations, number of parking sPaces' etc.)i 4. Completed DRB application form. Procedure: Upon receipt of an application-for conceptual delign review, the DePartment' of Community Develbpment shall review the submitted materials for generai compliance with the apPropriate requirements of fhe zoning tode. If the proposal is in basic compliance with the zoning code requirements' tbe prolect shall be forwarded to the DRB for conceptual re.rie*. If the application is not generally in compliance with zoning code requirementsr the appiication and submiital materials shalL be returned tb- tne applicant with a written explanation- as t-o why the Community DeveloPment Department staff has found the project irot to be in conpliance with zoninq code reguiretnents. Once a conpfete application bas been reieived, the DRB sha11 review the submitted concePtual review application and supporting rnaterial in order to determinL whether or not the project generally complies with the design guidelines. Tbe DRB does not vote on conceptuat reiiews. The property owner 9I I'is .repreientative shall be present at the DRB hearing' B. o LIST OF MATERIAIS o STREET ADDRESS Z 12fi ZIT.UAIA.A,I' DESCRIPTION OF PROJECT: The following information is Review Board before a final A. BUIIDING }.TATERIAIS: Roof Siding other waII Materials Fascia Soffits Windows Window Trim Doors Door Trin Hand or Deck Rails FIues Flashings Chimneys Trash Enclosures Greenhouses Other B. LANDSCAPING: PLANT MATERIALS: PROPOSED TREES required for submittal to the Design approval can be given: COLOR , tl I 4fi)cco t' Phone: Common Name Ouantitv Si,ze*-L O' EXISTING TREES TO BE REMOVED *Indicate caliper for deciduous trees. @ deciduous trees is t inqhes. Indicate height for coniferous N/A PLANT I'IATERIO ! Botanical Name PRoPosED sHRUBs 1@!;!q -Irl €'{x>rd,l-,par" Shrr.lb corrol".e ouantitv Size* n Sqdl -+(\ I att EXISTING SHRUBS TO BE REMOVED *Indicate size of proposed shrubs. Minimun size of shrubs is E nr 'l I nn Tvpe Ssuare Footaqe GROT]ND CO]/ERS SOD TYPE OF IRRIGATION TYPE OR METHOD OF EROSION CONTROL C. IANDSCAPE LIGHTING: If exterior lighting is proposed, please show the number of fixtures and locations on a separate lighting plan. Identify each fixture frorn the lighting plan on the list below and provide the wattage, height above grade and type of 1i9ht proposed. OTHER LANDSCAPE FEATURES (retaining wal}s, fences, swinming pools, etc.) Please specify. Indicate heights of retaining walls. Maximun height of walls within the front setback is 3 feet. Maximum treight of walls elsewhere on the proPerty is 5 feet. D. ePD. UnA,x Pf. ?-?f. lr fu. ,l|rrr, "o.orro* **rrr.orrJ I a' SUBDIVISION JOB LOT NAME BLOCK FILING ADDRESS The location anil avaiLability of utilitiesr vthether they,be -rnain trunk 1ines or pr-p-"ed line-s, nust be approved and verified by ihe following uiitities for the accomPanying site plan' U.S. west Communications 1-800-922-1987 468-5860 or 949-4530 Public Service ComPanY 94 9-57 81 Gary Ha11 HoIy Cross Electric Assoc. 949-5892 Ted Husky/Michael Laverty Heritage Cablevision T.v. 949-5s30 SLeve Hiatt Upper Eagle VaIleY Water & Sanitation District * 47 6-'t A80 F.red Haslee NOTE: 1. Authorized Siqnature Date plan, and elevations when '& Sanitation signatures. Fire This forn is to verify service availability and. location. This shoul-d be used in conjunction with preparing a utility plan and scheduling installations. For any new consEruction proposal, the,applicant ."lt pio"ide a comPleted ut'ifity verification form. If a util.ity company has concerns with the proposed coistruttibn, the utilitv reprg:?l!:!il" inoirfO note directly on the utility verificatton form that there is I problern which needs to be iesof"ea. If the issire 1s relatively complicatedr ii-sfroufa be spelled out in detail in an attached fett.t to the town of vail - Hohtever, please keep in-mina that it is the responsibility of tfg. utility company and owner to resolve identified problems. If the utility verification form has signatures iiom eact, ot Ltre utility conpanies, and no "o*r"tt" are made direclly on the form, the Town riil-pt""une that there are no problems and that the develoPment can Proceed. These verifications do not rel'ieve the contractor of his responsibility to obtain a street cut ptrmit froir ttre ToYtn of vai1, DePartment of Public fr;;-ia and to obtain utilitv lgcations before - .- diqqinq in any public right-of-way.or.easemenc rn ffic*t't ot viir. A buildinq permit +s not, a, street cut Dernit- A street cut Permlt musE De oUtainea seParatelY. * Please bring a site Pfan, floor obtaining Upper Eagle Valley Water flow needs nust be addressed. DATE: TEGA], DESCRIPTION: LOT ZONE CHECK FOR sFR, R, R P/S ZONE DTSTRTCTS BIock 4L ,trrnn-?,qb{Gt*' i t t-rr^ ADDRES5 , 6zel A&-U^r-aql OWNER ARCHITECT {*euon JTrtp^ (47e.oo7j PHONE PHONE q4q-Awr ZONE DISTRICT **LOT SIZE Allowed ,#,&t,Height TOtAl GRFA NIF Primary GRFA N/A secondarv GRFA , Setbacks + 425 + 425 (w -F?.Anf Sides Rear 20, 15t 15t (30) (s0) |qr" 'L' 16,' 4Re 447" _ 4z View Corridor Encroachment: Environmental,/Haz ards : Date aPProved by Toltn Engineer: Yes 1) Flood Plain Nt 2l Percent Slope \17a 3) Geologic Hazards \.l/fWYTW rlg& sr \rtt a) Snow Avalanche-\ b) RockfalI -N' c) Debris FlowL &W1P t- Does this request involve a 250 Addition? 'lg', =How much ot Cfre allowed 250 Addition is used with this reguest? 4) wetlands Previous conditions of approval (check property file) **Note: Under Sections 18.12.090(B) and 18.13.080(B) of the Municipal code, lots zoned Two Family and Primary/secondary which are less than t5,0b0 sg. ft. in area may not constrult a second dwelling un+t. The Colnmunity DeveloPment Deplrtment may grant an eTcePtion to-thl." ;;;i;t"iion p.ot'idea tn"'applicant rneets the criteria set forth under Secrions 18.12.os0iBl -ana i'e.1.3.080(B) of the Municipal Code-incIu9*"s permanently restricting the unit as a long-term rental unit tor rull- time employees of the Upper Eagle Vali-ey- fltr* d^o[.{ t'1r[ 4d a:D" qrd (300) (600) (900) (1200)_ Permitted Slope -..]gL Actual SloPe Existinq ProPosed Total -1 ,zb-b 4i.6 */A w"t"t course setback Site Coverage Landscaping Retaining WalI Heights Parking NIA catase Credit Drive: 10 t€^rls€d 2n4gg Date of Application Date of DRB Meeting Date of PEC Meeting (if necessary) AppLtcATloN FoR ADDTTTONAL GRFA (250) TYPE OF REOUEST ,/ Standard 250 Type ll EHU 250 Type V EHU 250 II. PRE-APPLICATION CONFERENCE A pre-application conference with a member of the planning staff is strongly encouraged to discuss the provisions under which additional GRFA can be added to a site. lt should be understood that this ordinance does not assure each property an additional 250 square feet of GRFA. Rather, the ordinance allows for up to 250 square feet if the conditions sei forth in Chapter 18.57 or Chapter 18.71 ot the Town of Vail code are met. Applications for additions under this section will not be accepted unless they are complete. This includes all information required on this form as well as Design Review Board submittal requirements. III. APPLICATION INFORMATION PRoJEcr DEscRrplolr A/J.hr^ {- o^r'sl*r psdc^cz A. LOCATION OF PROPOSAL:B. Address lWEt Legal Description:LottZ Btock_ Fitinj ft Zone c. D. NAME OF APPLICANT: oJ co Address 4zzt G Address Phone NAME OF APPLIcANT,S REPRESENrnrrve: 4q,r,0,, !Z,Jo^ . {f,L.Ie.f E.NAME OF OWNER(S): *r stgnature(s Address F. Filing Fee of $200.00 is required at time of submittal of a standard 250. For a request involving an EHU, the fee is waived. The following information, in addition to DRB submittal requirements, shall be required with this submittal: 1. Verification that the unit has received a final certificate of occupancy. 2. Stamped, addressed envelopes and a separate list of adjacent property owners and of owners of units on the same lot. This information is available from the Eagle County Assessor's office. 3. Condominium Association approval (if applicable). 4. Existing or proposed floor plans of structure. G. Your proposal will be reviewed for compliance with Vait's Comprehensive Plan. H. lf this application requires a separate review by any local, State or Federal agency other than the Town of Vail, the application fee shall be increased by $200.00. Examples of such review, may include, but are not limited to: Colorado Department of Highway Access Permits, Army Corps of Engineers 404, elc. The applicant shall be responsible for paying any publishing fees which are in excess of 50% of the application fee. lf, at the applicant's request, any matter is postponed for hearing, causing the matter to be re-published, then the entire fee for such re- -publication shall be paid by the applicant. Applications deemed by the Community Development Department to have significant design, land use or other issues which may have a significant impact on the community may require review by consultants other than town staff. should a determination be made by the town staff that an outside consultant is needed to review any application, the community Development Department may hire an outside consultant, it shall estimate the amount of money necessary to pay him or her and this amount shall be forwarded to the Town by the applicant at the time he files his application with the Community Development Department. Upon completion of the review of the application by the consultant, any ot the funds fonrrarded by the applicant for payment of the consultant which have not been paid to the consultani shall bb returned to the applicant. Expenses incurred by the Town in excess of the amount fonrvarded by the applicant shall be paid to the Town by the applicant within 30 days of notification by the Town. o o FoCM NO C-5oo0 lo.lc-sda q39isn Forr!1 34?A LT4 3 sr'.rt Po 'c, - Fgr fr E - I gtJ r\n€n4o4 tu-t7-70 j 1 I I I I it I I I I i l I I I I i i I I I I I I I I I I \ POLICY OF TITLE IHSURANCE I$SUED BY TR A N $AM E H I CA T! TL E I N S U RA I.JCE C* f=".* =A iai Y $U3JEC? r? THE SCHe-DULE CF EXCLUS|Ci{,= FF*i'.4 ,;L===FAG-. T-E E;{C=..E:,*=:=5 *._-i.j- TAl,\.lE* :N seqEluLE B AFiD rHE FROVT$llfi{= *F THE *,*=i.i*;Ti'--r1.j= Ai-.i* 5i, =!i,_-eii:;.;+|JEPE+F. rRAfl!sAi'4ERlcA TiTLE lllsuRAl-lcE =+L-'BF4l';vl. * c.a!ii+:"=ia r+i#+:.si!+*, -.-=i=i:- .,i+i;*--+ :.'-= f+m p.3nyr', ;r,sirrs$. aS of Date ol FOiiCy gh+v+n in SCn*ri,.;!e A, ;g;i+=i lcss;i gg;=;;--. ii_:j. +:r.-.=-i-* lFe 3n+urt ef lngi;r*fic+ stai€d ln $thqcf ule .4., *r- c+st=. +t+r+s.!--c re+* end = {==-==.j 'r,,-;--= t*+ fcr:Da+:*' nr -3t: becorc+ cb:iga:6'i l.-' $ay h+reur+er =*:it;r:+j =-,- i=+ii:"ie; *; l-= i.-'--.=.- =.i :{=.=++:,-. +i; 1. Tjtr€ tn i\+ t-ctate *r i:ttere$t .j+scribed In *+hedi:i+ e. t+:nF .j+=i-j+ ;':ieir';;,iri :l+:l == =:r.:+- :-=+i+:i:: i A:',';.lrj1*:i jn cr !!e;'l Gr €nL1!jrrlbrsic+ on such tit!e: 3, Lif.,i. +{ E rtFhi ':f 4i:.:FFF tB Sr'j# ff.r.n ihe lSnd, rr: 4 U*rlar'{.etabt!ily st su0h lltl6, i:! \lJlfl';F$S f'Vil=RCSF fr* t:ie':'':*iiie Tiiie l*si-;,'.=-t+ --ri-i,==-t -=i -.=:i,i=:-=: ,=1;==i::-.-,;:, =i=r;,=r:=,..- Er:-1 *+-t-6 b,y ;ii JUi,., euthlrirg,,i ,,_-fi,ier-= nF 5i *+:+ r:l P.,=i!;;,51a.** t* Ei-+=..::+ .r_. tsi-::eff Dtvtstsr'i oF INSuRAF*CE liF4Rit{Ei.i1 crF RE=u Lc'+E} _q-E...ta'Ei :74Tr t:iF tE i._rii_3ii+c . iiJi t ir:FEi: Av: oE.rvEq. ctrLilFaoo 8+ao3 r'lay | , r9// gTATE L:l: C CtL OF AoO Besr FeE I Ettate Pur;hnler: Eo! lcr.ii"lt thls letter .;;, rri ii f iiil ; br:ef .:,rr j..r-Fi't-- .--. /*irr tiii-- 1.5 u ranct cr-.tnlt.qnt and pellcy, Tlile !ri.:rinie :+::, e'rle: {re f+?rl.trJ !;, r-li: l':!',1;r! a: *re athcr t,!,F4-{ af iii,<irrarce .rrn}:}i||+L T!,i: i\i';l-::+r iitl.:tt ..ri-if i.a; t+it- Fanl€! i6trint i tlr l r-,,.rr., eAnce .-+'-r:r i!:r+ --:: ini !'t:F I i..ff"Cn i,,,'-::.ii firene,'El!v trri.J, tnd tt:at they ope"*i+ l: air;r.j.:;:e .-lfh iaEirt*=,- dnd reguiotlont. Ve gl;.; IigtTg r greal i;.ie-e:t Ir: r,:r!:lr,l ;.-iiii :;-r ia+, t; lF* .onsu|ie., !r.r'Fr!,tt,tii tfr F!jrp+ge .-'f tlt!* l,-lu:-;...;6 ;i-,i f!el i..t* ijflitr:rinit /cJl' :-rghls iif d€r :-,!-rr r lirr.rranc* pcl lcy, lit thr r.rett rir! ;r€ dli,:it I;t!+..1 ,.'ih 'e_r;.aFi,"i iiVr. :,i +ut .r-ri:-- :l{-)tS tr' Fr,=tilen: :', ;r1:r.r: tllle irt:,rr;::* r..TFlilr'i,r :,,i:: EiE E:1i,.:::;e: .+ ,cE.J .,iu:' aq-€rl:ll'! :trcerrir,g ilii; !:ir.,-;.r- r.;:. iii-:. j jlntl ,:i:; ,:r 'r{./ !rr: :E-l'i:i r{:r t!tlc !n3\t'er t- ':.:: i-rt+'ii, !; +.: ,=-n 1-it i,j =e;.it terti.r: 1rr, :li ,,r.- ":ilit5 sna i4:.+e +i. i-.,'r: ,-:-:5r ;-.+;. :;l i-; =:: ;.!rr !4,!, Frl +:':r!!e:c:,,f.! et Ell t;ireg. JFB:bl S ince rel y, ri',,i\D BAFiI:i., i.L, ., !r! i -1-rt! o" li:iui-d: :-J cQf.lTrr.tu ED L;i.i HEv rH$E tl FOFIM NO. C,!OOO-l 7C4 LIF n/ r7q CcLoFAco qt.,,:..AHERIcAN L4HF Trf LE ^!9;a i^T:i!; .:'tt F ta -",-"9-.",." "-:!_:: , !!i1..{DlF ::.:? I{ A-rr,tun t of Inrrrzan,:e 3 l)ale of Policv 5C 'tn /}qn nn a'ar+v!rvw ,tnri.1 14, l aaa^, L-vv at 7:00 A.I'1. HEDI'LE A P,ili,'r' \i,..,. 11035:A Sh,r"t l r,f -4- 1. N,rrne oI Inrured: GOPCI.N E:.IFR' STL.N-,i a'ld JOYCE !,'i'^Tf,F$ 3 Th- er!.rt.r ui inlereii iri th-- !;nd rlt.cribrJ l:r'r"i:r chr! q?::e h it .;1r1-;"'j Li rh:= Frlirt=' ie; It.I fEI SII1PLE herein i::r! f].rle cf P+!i!:i' lirBte'l ir!: Tl-rv|*tr t'rF T:'e Blp,tt tn a!_ a:"111 a!!FF-! aE'raF.t !t. ii, '- IJ ;jr:_rL-al ct.l.lL.j.a. Bs tsnants ln csnron ! ! -FORM NO. C.600(1-2 f OR USE WITH COLCRAI}* FEii:+tJ A|!lEF ICAN FcR usE lYrTli col.o*iT+ RE+ic)N AtrtEFrlcar{ L/4NO ?r:Lts AS=:i!i.T!-itl L'--,4 \ F+L:rr/ I = :i , 1 4 a.! Eli !-- ED 1*- ! ?.;3 ) LA\I1 TIILE 1''<5==JiTi+i4 *tYrjER S Frrr-/c'/-5ri;',' a ;E-.: t.'n:l'1f1Ei :*.!"'?3; S C H E P tT L E A-Corrtinuerl The l.rnd re[erred to itr thi;1:rolicrv ir:itrr,rted iIr tlie Stlrt'r cf C+lorlda. Counll'af F.=rr'1,: , nnil i+ tl':rcril''erJ r* f+llo"; I I,/2 cf en undl-vlded I,4 j:rterest or }.rror..n ln Lhrt ?2, BlG HOFI{ TERRAS, accorcling to tlte Pla+- thercof , recor-ded j:i aE Li4 iritercrst Hk at Page 474 - FOFIM NO, C.6000.3E rER UGg WITH COLORAOO EEl;I"II oo AM ERICAN LAND TIf !E ASS.)CIAT :O\ O!VAi 1\'E F.:L-IZIXFLA: &t 9-l97C .nvENpED ig-l7-79| SCIIEDTiLE B This Pclicy- tlors nol ingure a$,rinrt Itsr or tlanregt b), re;r:c,n of tlr* I*llu*'ing; l, Eightg or r::l;rirns ol parties iti pcsressiirn trqt shr,ri.n by the publie ri:cord6 2. Easernents, or tl;rirns ..rf el*emcfilrrr n.rt shortr by the puL:lic recortlt. 3. Diar'rc;ranc!ee, corrflici: in boundarv lintr, lhortage in ari:1, tntrlarLnrerrt., arrrt any f:r.-t; r. !ii,--It a t+t. tect durlPv and inepe.riiolt +f lh* ;rrenriets rrr:rtl,J disctaer air.:l whirh ar" not sli+-*rr by the p;Lli; r€cgiiii, 4, Any lien, ar ;ight t{, e lien. for serricer, lalror, 'rr ntateri;! ]r,:ret,rf,-lre ;r hererftr;r fnrnishe,l. inrpnsrd i1;' larv anil n t Ehown by tlle public recordg. 5. T*fee due ancl gtrr;-aLlel anJ sttv !ax. epeei,rl r]g3es$]r+Gl3! charge,:r litn inrp*;:il fo: *.-.:ttrr or se.r'er s€r!'i cr,'r or for rny olhrtt $fleciirt r.r:<ing tlirttrirt (', F1'?ht of $tai'fgr cilt-s5*t a.nd canale ConsE;ri.ctE{ l1r s1;i'11s,;iti,rf tl,e i'nit-rd Stetes. as rr,-Eerr,;ed Ly PatenL of reccrd,, 1 Res-,-s lc Li,.:ns, t.rr'i-ch dc not contaifi a fcr f L- it''r i:e Lrr: re','ar r'--F r- ;];r.156, =:r ,t{fll:,3ri1ft1 in irr$'--r'.r-,ent resor.Jqii Decs:ri:er 20, .1962 Ln Eac,k 1?.i et F:r,;e 8L Ttri F.crr'csri ncri-t€+-!-!ipar-i.rig royaitl' j-r a.nd to +je Frcci":<:s d,.:ri'"'a4 fr,= Li-=- SaIe c-'f an !. r'L-rerai s of v;lntsoevef kfud ,3fLl iratrlre r prcd.icr'{j .r:ii .-,rng}i fr.:n *qttbjr-.ct p;r,Fa.rtj", aE reseF/ed to Gust Kiahti;es, eird R/a j. liia'-t.;es bi'hr-.i r+":.:rdeC }L-..'snl.er 2, !962, lrr Ecok 166 at, Page 407r and.:n:'air-C €-r: assilr.re-:ls tlrerecf or l-nteis..lcts therein. 9. Ea==trertt a--d rl,Jhri c! v61j' fcr Ges li.11e p:r:6*rse5, e.= .rra.-,.t_6'j. t+ !a+ iaf ;.li**r-:_;, T-:l;, , by Eag:.e COL;.ity' De'teloErnent O;rpcrat-icil , i-:r tLe i:: s i:=-r.-..ri ::+'::r!:'ii-l !+;ts-.ft6'y 9, i9C9, in Ecoir ?L5 at PeEe 9371 af!-cc+,i-lig ihe folllwi:1] ier.-rli-ai pr-fF€r-.-;.': A pe-r'r- ci Lo:s :0-.q, 2C-8, 20-C anC 2l r{f E.ighr.-'*1 fr,ii-<-i..,'i5i;-,h. Fes..rbielvisicn cf L,c.i 2ij Frnerd.:l ;;Iat, -cri:ri-y cf E+jie 5!::e,.-.j ;-1r],--;::i:r rrl)re lreJr-ic,l1.=rL!' dasc::iicd aS f Ollovs : CaunerrcinE al the )irrtl,easterli' ccn:r*r of sEi,l L.:tii--r L1Fi.:=. S36'43'00"1'i arr3 a1orl; the Saut,leaster' lrne of sald l*-" :r-;-1, li.7' i==-- to a Fai-lit of anrve; tJ:ence alcng sa:.i .it"rtJreasterlf i -:*,e aJ,:I i.1f ng r, {r.;:..'e to the rignt l'E-/jrg a redius *f 175,2i f*et, d c€rrtr.rl i-r,gla r-:! 18o5.i'iliaj!', ai axc Clstance af 41,30 feet tc a Forit -f tErgenti the-;'le 5 ,c:'r=7!00" ?l -=;,,J aicng *.ir,i $.aulteasterll'line 14,43 f+el to t]-e tnre i.+l-rt;j l-=Ji.-rr.ir.;i ;*L,e:.;= ccrtjnuinE alcng Ure afr-'resaid eourso 1C.00 feet; Lhence on =,,- an]lFr t= El-t+ r].Eht cf 6?'?8'?6", 73,03 feet; thence cr. an arigl-e to iJ.e lej-' +f C5o0-ii. 80.08 ii-.,i; tl.ence on Er angl€ to tf€ left of i0o0.1 '18", ?1;.!€ feet; +j.,=-.,--' on an :--rg1o :o +Jrc rl.gl:*L cf l'1,"0C'00", i0.00 f'-=et; tl.Erce cr: ar- +-xii, e i,+ +*:^€ rigirt of 9(.to00'ff", 2ig;44 fee:; thence cn an.lngle io tlr-,right- of l0'0.i']f,'.. B1..li Seet; tlirlnce cn axgl.e to tle ri';ht of 05"{7r4e", ?3.?? f+et trlr ile +;:1-= point of begi-rudng. L0. Access, utilj.ty, ard parkirg eas€ir,ents as -qhoe.tr on the 6;ial -:i said Srrj:C,i.,"si-cr, Ari:/ ard a1i r'lglts of the oinnet of t"he pr.+;;erty ad;{rrrj.ng -n Lie 3:"..t}e:-J.ir pe r : af Eaid i.:r ar is:--rE frcrn the erection or eylsteflee af a cctruren t^a,l i : '-< ated il' ' - ' ; on tlle subj ect FraF.,€rty as slEv;n on tjre plat of, aaid Su].rdivisicn, 11 FORM NO. C,cOoo.sE :CR UAE WI'H COLORAFO REEIO (AiiE gf9 IO.17.?Ot oo N AMEx|CAN LANO Tr"Lt ^6gOCiA"|OH OrVH:E'e FOLtfy-rgRrt B*1e?O SCHEDTILE B Thir Policy does not insure against lorr or domoge by' reeaon of rlla follr;rving: L Bighte nr clnimr of pnrties in pogagion not 6hown by the priblic recordr. 3, Eaeementr, or cloinrg of ra.jcrnente, not eho*,n by rhe prrblic recordr. 3. Diecrepanci€e, contlicls in borrndorv liner, rhottage in ,rrer, an(rrrirchmetrtr, ond any farrr ruhith r eor- tart !urve'' and inspectio;1 of th+ pren.riaer woukl dircl*e and r.hiclr arr nol shcn-n b; tlre prbl!e r?r.ordr, 4. Any lian. or right to e licn,, for rervice*, labar. rrr materi.rl lreretofare or hereafter furnirhed, iriipored l>;.' hw aad na! rhorrn by the public iecords. 5. Ttx* dne anrl pnvable; rnd an,r' lax, special aixes-crrentlr rhr rge or lien irnpo:ed larf *iiler .rr re!*?r !en'ica, or lor ii,ry other epecial raxing districl. 6. F,15ht cf he.y for dltcl-es and carals ccr.Et-::ricted b:r artlori;y of !h'^,: I,rn:ted State: eE r€seFJ€rd w Patent of reclrd. 7. He-=SicCcns, r^hlch do not contaln a fcrfelt'.r:e or re'.'erter cle!'is€. s€ rtr+xt4li€d ur iii;rtrtner,t recorded Decerni:er 20, L?62 tn Ecch 174 at Page 8L. I "' Te.n p*rcert ncn-particiFat!:E ro)alty in er,i to Cle prcsetlcs celi.;c',I frer L'.e sa:e ef ali)'minerais of h,hatso€!'er hi.d EJd netl.re, FircCtcd a-:c rrllri€il f:13n sr:.Ji:,; ecr- iFaFcrly, as resern'd to G.ist F.ral-tige:, and E.'a .-1. Hid,:CFe: b;z iaa6 reccr:ilvl lb,l'sri-er 2, L962, in Bcok 1.66 at Page 4C7, a,nC, FJy.r-d a-11 ei--;9.*;-'tr-iitE.tlercef oi ixterests tP,efetn, HaEs,e-::t erd rlE!:t of vral'fcr Gas li-re prrycees,. as g!-ran:al:.i C€= ?=-:'.''r.-i.==:*:e., bf Eaglc Cern{:;' De';eloprent Corgoration, ln L'1e {. r, s -'-r*-.--.,: i ----?: je': .r+,i:€r.. '' 9, 19i9, !1 s*k 215 at Page 937, affeetlng the foli*.ri:rg d+rcr',L*'tr ?::.Fer+-i'i .t. r€r. nF T,:1-:r :10*F., 2C-8, 20-C and ?n d _ H i,-Fr--rn I',.Lts i.:.. r il.'.,1 ,$l{ LU_v, FesubiC!'lsien o: Lct 20 i,rne.ded Flat, Ccrirrti c: Ee?1€ S:':E,ri i.:r:lia.-ict Ftrre liartlellcly dcscrlbed as followel Ccrrrene i:rg af- +J:'! utrtheesterll' ecrner of *eid -irrt?i-l; ',:-'s:e SlrroC3'00"',{ and alcn; the SoutheasterlSr line cf +:al:l l,cr: .;a---..; -}:.:: ate= to a polnt oi cr-rr,'€: +jence alor.g saiC S.,rLtt}:e.i :'r-er 1.' ll*e -e.'j : l;:ar--; + f-.ll=..'= trt tiIc r-ight ! lav ir,g a redius of 175,20 fe€t/ R r€rr':i:i .$-;'l€ :l :!+:4'i;i", a'- are d;starce cf 4].30 feet to a Folnt of targe:t; t:-E:.c€ S -i5o:=:t';Ll" ?: erai: aiong seid Gcrir*heasterly J.ine 14.43 feet to the t-nre F!--rlnr- cf 1^+3i-r-s:-:. : +-h-o contirrlng slrrnq :l^,e afcresa-j.d eourse 10.00 feet, 'herr€e c.r 6rr ar:E,l-r-j *= +=!;€ rlght of 8?o28t26"f 71.03 feer*l thence on an aigLe to eire le:t. of C5==-'i=" 81.0t feet; tl,enee on ar. angle to t}"€ left of 10o0,i'38", ?11 ,34 f+et.; t,--.=.::; on an angle to the rlght of 90oC0'C0", 19.00 feetl thr,rnge on a-r !- ?le'** -:1t rig.'.t of 9'l'C0'00", 2I8.44 fee*-; r-\ence an eJ-. angLe te tl^.e righ*- ef l'l'r:l'i'l':' 81.4i feett tJn:nee cn angle to tJ:e r-j.gi".t of 03a0?r49", ?3,92 :eet ts* tle Lr''- poirrt of beginning. lC. Asc+ss, utility, and pa;hirg eage-r€nts as el^c$.q cn the plet cf said Srrb'l,i':l=--':;n. LL. tuiy anC alt right,c of the cr*rc,r df tle pragerty adj4jrilng cil F*he -a-*L',el i-" ;e -:-of 6aid lot- erisirg frcrn the erectlcn dr e..tlstence of a c#Fr*n raii iocat+' -:s-: . on ile subjegt FroFtlrt:, as stprtn on bhe ptat of ce.td Sr.rHivlelc'n. g N .l A M E S. OST OFFICE BOX 3238 vArL, co.81658 July 11,1994 (303) 949-4r2r FAX 949-0304 Comunity Development Dept. Town of Vail Vail,CO. Attn : Members , Planning and Enviromental Commission RE: Waters Addition Unrt 22 Bighorn Terrace Dear Members, ,- With this appllication we are requesting a varience to ordinance 18.8.060 to allow for a setback of less than 20' (twenety feet).This is to allow for the proposed expansion of the exisiting unit.In fact the building area would only amount to 600 s.f. Specifically we are requesting setbacks as follows; West lot line to l2'-0" t*orth lot line to l5'-0" East lot line to 12'-6" Nrrmerous other units are in the same predicament as this nt[s annexed after the developnent was constructed and the zoning is highty restrictive towards the owners and their ablility to improve their residences.' Previous commissions have approved similar requests, we ask only the same consideration This addition will not effect the light,air ,population,transportation,,traffic,utility,or public saftey. Thank You for your consideration in this matter- James Riden A.I.A. Regards, . MEMBER OF AMERICAN INSTITUTE OF ARCHITECTS. et * -t m Ig L-O l{ ;-l o l<x f l! >z I lm: 6 lar^t l;x A lri g IIP o liq 3 l=P i '<E T5 o< 6e -o iio >l 74 ii= 'n m - 3trP m:- u 142 =c)c)YP tr8tr NTT c)o z o {F c o {o z T 1|l F ={ 5. x!trJ \J '_(, CL -.r z= !.i >= E o"' H z 9z lq -t m lFr l*o l'- o l-!l'- < lE9 o- m ='-l -1 o (D m x m .It -{ z C- @ 2 -t m F- C^)(jI _J €z m z =m 'Tl r z o I r H H H F{ H z Io |.J I _.t \o u) z ,{ t rtl E. o 9.n 7z >m --t >or v o _T' =m --t z -.t i 2; T< -1 Z f-m o -{ = T' o z -{n o -t o z,O an c)B =F *F I> Y I =l -l I I l{ _l:;l:rl)D.l- 3l*-la lz le I l*lvl IF ll I' z v. c)H H z EE lzl tol EI l>l l-l l*l ll l-l to l€ lz lo II l>l-ll lm lo l= le F H 3 z -{ €z n t- m z --{ t--l mlo It€:tz F t<t> lF lfi l6 I I I (O O --!-;r6 oqat -o (t (.) =' \< R Ex I:- -P€{io =;3 *6'o o:1 J -Oot =--o:a roJ lfqt i- <ioro X o,o lo,od= E +q1 OXo) -=E 1) lrE qr -;'_f +ii =o;'v =.:oo+fr= ?rf(b -.=3.o €9P ".^:=s.F ; a'=5 sJ iqto o-=ox o BE::Qts !Y -.:o).): sro=. { J o =. o o o o f (o o o -l € N f (o : (t,c f o o ; @ o =(D o o --t m :z z -.{'r m €z m m -D t x = <J' _-l z a l z >l- T m :o z m m m o 12 l=it I c -l -.t o<-n -o m o € 0 J z qt c r --l z m j I I --r l"r t6 tm I IP - ft IO q€ r l.- 26 'z = z>eR :!d I<'+< >o d (ho z c z : I z m € m 4 o z Fi X x g _--t z \ 4 m -o --t m c n c -.t z <,1 Ft(Fl ll Hli c)t >lt sll EE 8lt 3l;€r frr t:xll HI'v)t(FIK CNF .l li li I I I c)NF I p1 m)lri r!r;F io -).n x zct vtQo o<z tOq Io 62 o= E b zq--'r 'nzz € x N -.t 4 t)I { I -.1 3 F I N >o tlz LZ inF FE@ >c Fo =z -o tz -{ F'T El iEl I FI ol €l zl I v)l Frl vl HI :l qJl 'l I I I I Et 2',>t =l 2l gr ol -l ot :l = ltr Yr 2 t{ ''t ;tH ol ;.8 F:lt I A lrd ;,o I l(/)lFl IF r}{li lEl '<l I 'r- Ol Or-:r. . ;l ''l\o I ,ol I I Ir tl ".4 FI z n -{n I i t- m 3 -r TI m m (t c 6 m x m z t tl m T o 2 i m I o z m m € (D m o m =o z II m =tn o - z c = = m f m o o -tt t- z o I m x =z o m = = !m ='Tl m m u) VALUATION m 3 =z o H P r! m z 6 r =z m m --t l- z tJl s.s.& R\$ i N\ I o INSPECTION 1;. .l REQUEST PEBMIT NUMBER OF PfOJECT 1--.--. .i ..\I.. DATE r- ..\ r'.-- JOB NAME READY FOR LOCATION: _\:,:I':y '-"-'\-MON. TUES r. WEq.' THUR FRI AM Bl tr tr tr D tr tr tr ILDING:PL tr tr tr D tr o tr UMBING: FOOTINGS / STEEL UNDERGROUND BOUGH / D.W.V. BOUGH / WATER FOUNDATION / STEEL FRA[/ING ROOF & SHEER PLYWOOD NAILING GAS PIPING INSULATION POOL / H. TUB SHEETROCK NAIL tr FINAL tr FINAL ELEGTRICAL: O TEMP. POWER MECHANICAL: tr HEATING Elnoucn o tr tr EXHAUST HOODS tr CONDUIT SUPPLY AIR hf rrrunl tr FINAL U REINSPECTION BEOUIRED DATE..,) "_ ?L." INSPECTOR The ltens below glvlng a pernlt Please check off FINAI PLT'MBING INSPECTIONI S need to be coBplete a flnal C of 0. ln tbe box provided. COUPLETED before T DATE:tl FINAI. UECHANICAL DATE: IMPROVEMEM SURVEY RESID. NAI.IE: DATE:. .\.t\*"K FINAL ELECTRICAL p^r* q- <{ - E, FINAI. BUILDING EAST SIDEs WEST SIDE: DATE: TEI'TPORARY C OF O DATE: CERTIFICATE OF OCCI]PANCY LAI{DSCAPING DI'E tr I DATE: FILE NN.TE: T NUMBER OF PROJECT .L. --INSPECTION REQUEST TOWN OF VAIL . \v PERMI DATE JOB NAME CALLER Tt ttrq READY FOR LOCATION: WED THUR FRI PM AM a BUILOING: D FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH i D.W.V.tr FOUNDATION / STEEL tr ROUGH / WATER ROOF & SHEER PLYWOOD NAILING tr GAS PIPING ,B,INSULATION tr POOL / H, TUB f] SHEETROCK NAIL tr FINAL tr FINAL ELECTRICAL: O TEMP. POWER D HEATING O ROUGH O EXHAUST HOODS tr CONDUIT O SUPPLY AIR tr FINAL tr FINAL )s!APPRovED CORRECTIONS: tr DISAPPROVED C REINSPECTION REQUIRED INSPECTOR L{ ts1 PERMIT NUMB R OF PROJECT DATE READY FOR INSPECTION:MO LOCATION: { INSPECTION REQUESN. TOWN OF VAIL '-- I I i' I z1 I JOB NAME _ ., r !(,-.) lvl ( 14; i'vr.t{ [.' \ CALLER y'-' (' D{ ) (f -:t \r1 i i I . ,.,,,l,-, .u '\-,/i4 ,,"ruES wED rHua 1-fft AM PM BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND O ROUGH i D.W.V. D BOUGH / WATER tr FOUNDATION / STEEL tr FRAMING - ROOF & SHEER " PLYWOOD NAILING D GAS PIPING tr INSULATION D POOL / H. TUB tr SHEETROCK NAIL i,*ot I l^,tr FINAL MECHANICAL: tr tr o IJ TEMP. POWER tr HEATING tr EXHAUST HOODS CONDUIT O SUPPLY AIR tr FINAL I neenoveo CORRECTIONS: tr DISAPPROVED tr REINSPECTION REOUIRED /: .,fr oor, 4,-, -/?--Qd rNSPEcroR PtiHslop 75 south lronlage road vail. colorado 81657 (303) 476-7000 ottlce of communlty develoPmenl October 16, i985 Dear Home 0,rner, It has been brought to our attention that several of the owners of the Bighorn Terrace units have been experiencing venting problems with thejr boilers or hot water heaters. Based on the information that we have received and further investigation, leads us to believe that you may have a serious venting problem with your boiler or hot water heater. According to Gary Hall' a Public Service Compairy representative, there is evidence that the Type B vent located on these appliances may be rusted or deteriorated to such a degree as to render them unsafe. Therefore, b,e are urging you to contact a profedsional to check the venting of this appljance in your unit. If you so desire, you may contact me and I will be glad'to perform this inspection for you. However, you must be aware that snoutO carbbn monoxide be shown to be leak'i ng from these vents which would pose a life safety threatr jour gas will be shut off unti'l the problem is corrected. if you have any further questions, please feel free to contact me at (303) 476- 700b ext. i07.-Your cooperation in this matter wou'ld be greatly appreciated. Si ncerel ry Mu aln Acti ng Building 0fficial t BIGHORN MUTUAL SANITATION AND RECREATION COMPANY MEMBERSHIP ROSTER Condomi.ni.ums: A-1 Jeff and Judie May L2683 E. Bates Circle Aurora, Colorado 80014 Josh and Carol Hulce One Driver Lane Columbine Country Club Littlet,on, Colorado 80I23 A-2 Mrs. Phoebe Barrett 225 WaIl Street VaiI, Colorado 81657 A-3 Valentine and Leontyna Grzebiniak Teresa and Gary May 8150 West Calhoun Drive Littleton, Colorado 80123 A-4 Dr. Joseph and Jan Hanlin 2403 Virgo Drive Colorado Springs, Colorado 80906 Dr. Mark and Sa1ly Mill-s 7134 Wintery Loop Colorado Springs, Colorado 80919 A-5 Eldon G. and Florence Pritz I900 Constellation Drive Colorado Springs, Colorado 80905 A-6 Mr. and Mrs, Arthur T. Skaer 3855 South Hibiscus Way Denver, Colorado 80237 A-7 Mr. and Mrs. C. Stanley Wilson 5455 West Jewell Avenue Denver, Colorado 80226 Telephone No. 303-75s-8547 303-794-9696 303-476-6330 303-978-0932 303-632-2360 (H) s96-1230 (o) 303-599-5363 (H) s96-308r (O) 303-47 3-4049 303-757-2897 (H) 320-1071(O) 303-922-0375 A-8 Mr. and Mrs. Charles J. Nassimbene 3I2-945-ILL9 1336 Kenilwood Lane Deerfield, Illinois 60015 (separate house ) T. M. Boyle and D. K. Nicholson 4277 CoLu:mbine VaiL, Colorado 81657 B-l Helen L. Peterson 3024 NE 34th Avenue Portland, Oregon 972L2 B-2 Pepi Grammshammer Vail, Colorado 81557 B-3 John Donovan Copper Bar Vai1, Colorado 81657 303-476-5626 303-475-3511 Telephone No. B-4 Slifer & Company 303-476-242L B-7 Rodney E. Slifer, President Box 1248 Vail, Colorado 81657 B-5 UIla and Karl Hoevelmann 303-476-2568 4207 columbine Drive, #5 Vail, Colorado 81657 8-6 Richard A. and Dorothy Burks 303-476-4350 4207 E. Columbi-ne Drive Vail, Colorado 8L657 B-8 Mrs. Bernice F. Finnegan 1905 Broken Bow Drive North Litt1e Rock, Arkansas 72116 DUPLEXES: D-I Robert H. Riordan, M.D. 19 Drury Lane Berkeley, California 94705 D-2 Ted P. Stockmar 303-861--7000 D-25 1700 Broadway, Suite 1800 D-26 Denver, Colorado 80290 D-3 B. c. Taylor 405-251-3760 D-4 c/o HalliburLon Company (ask for Robert E. 2600 Southland Center Rice at Halliburton) Dallas, Texas 7520l- D-5 Mark Pittman c/o Clear Concepts 74 Huntly Houston, Texas 77056 D-6 Mrs. tinda Moore 303-476-0304 Box 1277 Vail , Colorado 8L657 D-7 Kathryn Ruth Benysh and 303-475-1490 Howard M. & Ruth E. Benysh c/o Kathryn R. Benysh 4242 E. Columbine Road Vail, Colorado 81658 D-8 Jenkins & Martin, Ltd. Mr. David Jenkins and Dr. Jon Grant P. O. Box 552 Manitou Springs, Colorado 80829 D-9 Johnnie D" and Deborah E. Odum 303-655-'1394 9728 Arapahoe Road Lafayette, Colorado 80026 D-10 Gregory L. Ridler and Robert W. Leet 7323 ChristoPher Drive Poland, Ohio 445L4 D-lI John S. and Margaret G. Houston 303-473-5772 2545 Scorpio Drive Colorado Springs, Colorado 80906 /-2- Telephone No. D-I2 John O. Chambers 6L2-474-5743 196 West Point Road Tonka Bay, Minnesota 55331 D-13 Dr. and Mrs. George H. Curfman Jr. 303-333-2728 20 Elm Street Denver, Colorado 80220 D-14 Mrs. Al-exis E. Lubchenco 303-322-45L7 250 Kearney Street Denver, Colorado 80220 D-15 Mr. and Mrs. Del H. Block 303-733-6056 950 South Euclid Way Denver, Colorado 80209 and Ralph W. and Beverly Turnbull 303-355-5591 558 South Pontiac Way Denver, Colorado. 80224 D-16 Thomas L. Engleby 303-979-ZL7Z 6432 West Fremont Drive Littleton, Colorado 80123 D-17 Dr. and Mrs. Hovrard P. Sherr 210 Summit B1vd. Englewood, Colorado 80110 D-18 Rick Haltermann 303-476-5681 (Vai1) P. O. Box 2631 303-893-9961 (Denver) Vail, Colorado 81658 (Arthur G. Bishop & Co.) D-zL Dr, Neal Llewellyn 319-338-9247 2401 Towncrest Drive Iowa City, Iowa 52240 D-22 Mr. and Mrs. M. Spencer Klein 20L-537-626L Box 225, RD2 Asbury, New Jersey 08802 and Mr. and Mrs. Gordon El1ery Strunk 303-321-8835 22I1 Be11ai-re Denver, Colorado 80207 D-19 James C. Sophir and Martj.n E. Sophir D-20 c./o The Sophir Company 4221 South 90th Omaha, Nebraska 68L27 D-23 Lawrence G. Detrich, E. Kay KeIIy, 303-832-9357 Kenneth V. Pe,rland. & Janet E. Peniand c/o Lawxence G. Detrich 899 Pearl , #4 Denver, Colorado 80203 D-24 Robert J. Alder and Diane M. Alder 303-757-0858 Michael H. Hurtt & Kaye L. Hurtt c/o Robert J. Alder 3330 South Albion Denver, Colorado 80222 -3-