Loading...
HomeMy WebLinkAboutF12-0013 Vail Library Remodel Hydraulic Calculations 05-31-12 Signed _ _ _ Fire Prakeckian �y Compuker Design Central Fire Protection 10775 E. 51 st Ave. Denver, CO 80239 (303) 576-8157 Job Name : Vail Public Library Remodel Lower Level Calc Building : FP2 Location : 292 West Meadow Drive, Vail, Colorado 81657 System : 3 Contract : 284212 Data File : Vail Public Library Remodel Lower Level Calc AREA 3.wxf I attest to the accuracy and integrity of this document � Marvin Heath, SET This fire sprinkler system hydraulic Central Fire Protection�ontractors, �n�. calculation has been completed in NICET Level IV tt079201 Fire Protection Engineering Technology/ compliance with NFPA, Local,& State Codes. Water-Based Systems Layout 2012.0531 09:00:57 -06'00' Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Central Fire Protection Page 1 Vail Public Library Remodel Lower Level Calc Date 05/29/2012 HYDRAULIC CALCULATIONS for Project name: Vail Public Library Remodel Location: 292 West Meadow Drive, Vail, Colorado 81657 Drawing no: FP2 Date: 05/29/2012 Design Remote area number: 3 Remote area location: Lower Level Occupancy classification: Light Hazard Density: 0.10 - Gpm/SqFt Area of application: 857 - SqFt Coverage per sprinkler: varies - SqFt Type of sprinklers calculated: QR Concealed Sprinklers No. of sprinklers calculated: 8 In-rack demand: 0 - GPM Hose streams: 100 - GPM Total water required (including hose streams): 288.312 - GPM @ 103.588 - Psi Type of system: Wet Volume of dry or preaction system: N/a - Gal Water supply information Date: 04/24/2012 Location: 22 West Meadow Drive, Vail, Colorado Source: Vail Fire Rescue Name of contractor: Central Fire Protection Contractors, Inc. Address: 10775 E. 51 st Ave., Denver, CO 80239 Phone number: 303-576-8157 Name of designer: Stephanie Pelster Authority having jurisdiction: Vail Fire Rescue Notes: (Include peaking information or gridded systems here.) A 10°/o reduction has been taken off of the original Static& Residual pressures of the flow test. See sheet FP1 for further information regarding the flow test. Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Water Supply Curve (C) Central Fire Protection Page 2 Vail Public Library Remodel Lower Level Calc Date 05/29/2012 City Water Supply: Demand: C1 - Static Pressure : 135 D1 - Elevation : 5.704 C2 - Residual Pressure: 130.5 D2 - System Flow : 188.312 C2 - Residual Flow : 1353 D2 - System Pressure : 103.588 Hose ( Demand ) : 100 D3 - System Demand : 288.312 Safety Margin : 31.154 150 140 2 130 P 120 R 110 E 100 3 S 90 S 80 � 70 R 60 E 50 40 30 20 10 200 400 600 800 1000 1200 1400 1600 1800 FLOW ( N " 1.85 ) Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Fittings Used Summary Central Fire Protection Page 3 Vail Public Library Remodel Lower Level Calc Date 05/29/2012 Fitting Legend Abbrev. Name Yz '/4 1 1'/< 1'/z 2 2Yz 3 3'/z 4 5 6 8 10 12 14 16 18 20 24 B NFPA 13 Butterfly Valve 0 0 0 0 0 6 7 10 0 12 9 10 12 19 21 0 0 0 0 0 E NFPA 13 90'Standard Elbow 1 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 Fsp Flow Switch Potter VSR Fitting generates a Fixed Loss Based on Flow G NFPA 13 Gate Valve 0 0 0 0 0 1 1 1 1 2 2 3 4 5 6 7 8 10 11 13 T NFPA 13 90'Flow thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121 Units Summary Diameter Units Inches Length Units Feet Flow Units US Gallons per Minute Pressure Units Pounds per Square Inch Note: Fitting Legend provides equivalent pipe lengths for fittings types of various diameters. Equivalent lengths shown are standard for actual diameters of Sched 40 pipe and CFactors of 120 except as noted with *. The fittings marked with a � show equivalent lengths values supplied by manufacturers based on specific pipe diameters and CFactors and they require no adjustment. All values for fittings not marked with a *will be adjusted in the calculation for CFactors of other than 120 and diameters other than Sched 40 per NFPA. Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Pressure / Flow Summary - STANDARD Central Fire Protection Page 4 Vail Public Library Remodel Lower Level Calc Date 05/29/2012 Node Elevation K-Fact Pt Pn Flow Density Area Press No. Actual Actual Req. DP01 7.333 5.6 7.0 na 14.82 0.1 144 7.0 EQ01 8.17 7.04 na DP02 7.333 5.6 7.0 na 14.82 0.1 144 7.0 EQ02 8.17 7.26 na DP03 7.333 5.6 14.06 na 21.0 0.1 210 7.0 EQ03 8.17 14.46 na DP04 7.333 5.6 14.06 na 21.0 0.1 210 7.0 EQ04 8.17 14.89 na S1 8.17 K=K@ EQ01 12.34 na 19.62 S2 8.17 K=K@ EQ01 12.14 na 19.46 L1 8.17 13.33 na S3 8.17 K=K@ EQ02 16.72 na 22.48 L2 8.17 18.27 na S4 8.17 K=K@ EQ01 17.2 na 23.17 L3 8.17 18.55 na L4 8.17 21.27 na M1 8.17 30.14 na S5 8.17 K=K@ EQ03 14.46 na 21.0 S6 8.17 K=K@ EQ04 16.45 na 22.08 S7 8.17 K=K@ EQ04 29.37 na 29.5 M2 8.17 31.78 na S8 8.17 5.6 30.66 na 31.01 0.1 90 7.0 M3 8.17 33.11 na TOR2 8.17 54.89 na MF1 3.71 67.53 na BFO 3.71 67.89 na BFI 3.71 77.0 na PRO 3.71 77.88 na PRI 3.71 98.21 na BOR 3.71 98.66 na TEST -5.0 103.59 na 100.0 The maximum velocity is 18.17 and it occurs in the pipe between nodes L3 and L4 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams Central Fire Protection Page 5 Vail Public Library Remodel Lower Level Calc Date 05/29/2012 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn *EQUIVALENT K'S DP01 14.82 1.049 2E 4.0 1.333 7.000 K Factor= 5.60 to 120.0 0.0 4.000 -0.363 EQ01 14.82 0.0748 0.0 5.333 0.399 Vel = 5.50 0.0 14.82 7.036 K Factor= 5.59 DP02 14.82 1.049 1 E 2.0 1.333 7.000 K Factor= 5.60 to 120.0 1 T 5.0 7.000 -0.363 EQ02 14.82 0.0748 0.0 8.333 0.623 Vel = 5.50 0.0 14.82 7.260 K Factor= 5.50 DP03 21.00 1.049 2E 4.0 1.333 14.062 K Factor= 5.60 to 120.0 0.0 4.000 -0.363 EQ03 21.0 0.1427 0.0 5.333 0.761 Vel = 7.80 0.0 21.00 14.460 K Factor= 5.52 DP04 21.00 1.049 1 E 2.0 1.333 14.062 K Factor= 5.60 to 120.0 1 T 5.0 7.000 -0.363 EQ04 21.0 0.1426 0.0 8.333 1.188 Vel = 7.80 0.0 21.00 14.887 K Factor= 5.44 *REMOTE HEAD TO SUPPLY S1 19.62 1.049 1T 5.0 2.875 12.339 K Factor @ node EQ01 to 120.0 0.0 5.000 0.0 L1 19.62 0.1256 0.0 7.875 0.989 Vel = 7.28 0.0 19.62 13.328 K Factor= 5.37 S2 19.46 1.049 1 T 5.0 4.625 12.138 K Factor @ node EQ01 to 120.0 0.0 5.000 0.0 L1 19.46 0.1236 0.0 9.625 1.190 Vel = 7.22 L1 19.62 1.049 0.0 11.000 13.328 to 120.0 0.0 0.0 0.0 L2 39.08 0.4495 0.0 11.000 4.944 Vel = 14.51 0.0 39.08 18.272 K Factor= 9.14 S3 22.48 1.049 1 T 5.0 4.625 16.716 K Factor @ node EQ02 to 120.0 0.0 5.000 0.0 L2 22.48 0.1617 0.0 9.625 1.556 Vel = 8.35 L2 39.08 1.38 0.0 1.000 18.272 to 120.0 0.0 0.0 0.0 L3 61.56 0.2740 0.0 1.000 0.274 Vel = 13.20 0.0 61.56 18.546 K Factor= 14.29 S4 23.17 1.049 1 T 5.0 2.875 17.201 K Factor @ node EQ01 to 120.0 0.0 5.000 0.0 L3 23.17 0.1708 0.0 7.875 1.345 Vel = 8.60 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams Central Fire Protection Page 6 Vail Public Library Remodel Lower Level Calc Date 05/29/2012 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn L3 61.56 1.38 0.0 5.500 18.546 to 120.0 0.0 0.0 0.0 L4 84.73 0.4945 0.0 5.500 2.720 Vel = 18.17 L4 0.0 1.61 4E 16.0 14.000 21.266 to 120.0 1 T 8.0 24.000 0.0 M 1 84.73 0.2335 0.0 38.000 8.873 Vel = 13.35 M1 0.0 2.157 2E 12.307 16.920 30.139 to 120.0 0.0 12.307 0.0 M2 84.73 0.0562 0.0 29.227 1.642 Vel = 7.44 0.0 84.73 31.781 K Factor= 15.03 S5 21.00 1.049 0.0 14.000 14.460 K Factor @ node EQ03 to 120.0 0.0 0.0 0.0 S6 21.0 0.1424 0.0 14.000 1.994 Vel = 7.80 S6 22.08 1.049 4E 8.0 16.000 16.454 K Factor @ node EQ04 to 120.0 0.0 8.000 0.0 S7 43.08 0.5380 0.0 24.000 12.913 Vel = 15.99 S7 29.49 1.38 1 T 6.0 0.500 29.367 K Factor @ node EQ04 to 120.0 0.0 6.000 0.0 M2 72.57 0.3714 0.0 6.500 2.414 Vel = 15.57 M2 84.73 2.157 0.0 7.500 31.781 to 120.0 0.0 0.0 0.0 M3 157.3 0.1765 0.0 7.500 1.324 Vel = 13.81 0.0 157.30 33.105 K Factor= 27.34 S8 31.01 1.049 1 E 2.0 1.333 30.664 K Factor= 5.60 to 120.0 1 T 5.0 7.000 0.0 M3 31.01 0.2929 0.0 8.333 2.441 Vel = 11.51 M3 157.30 2.157 3E 18.46 45.420 33.105 to 120.0 2T 24.613 43.073 0.0 TOR2 188.31 0.2462 0.0 88.493 21.789 Vel = 16.53 TOR2 0.0 2.157 1 E 6.153 5.460 54.894 to 120.0 1 T 12.307 25.844 4.932 * Fixed loss = 3 MF1 188.31 0.2462 1 B 7.384 31.304 7.708 Vel = 16.53 1 Fsp 0.0 MF1 0.0 3.26 1 E 9.408 1.500 67.534 to 120.0 0.0 9.408 0.0 BFO 188.31 0.0329 0.0 10.908 0.359 Vel = 7.24 BFO 0.0 3.26 0.0 3.170 67.893 to 120.0 0.0 0.0 9.000 * Fixed loss = 9 BFI 188.31 0.0328 0.0 3.170 0.104 Vel = 7.24 BFI 0.0 3.26 2E 18.815 6.670 76.997 to 120.0 1 G 1.344 20.159 0.0 PRO 188.31 0.0329 0.0 26.829 0.884 Vel = 7.24 PRO 0.0 3.26 0.0 10.000 77.881 to 120.0 0.0 0.0 20.000 * Fixed loss = 20 PRI 188.31 0.0330 0.0 10.000 0.330 Vel = 7.24 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams Central Fire Protection Page 7 Vail Public Library Remodel Lower Level Calc Date 05/29/2012 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn PRI 0.0 3.26 1 E 9.408 3.000 98.211 to 120.0 1 G 1.344 10.752 0.0 BOR 188.31 0.0329 0.0 13.752 0.453 Vel = 7.24 BOR 0.0 4.1 3E 32.783 50.000 98.664 to 120.0 1 T 21.855 56.824 3.772 TEST 188.31 0.0108 1 G 2.186 106.824 1.152 Vel = 4.58 100.00 Qa = 100.00 288.31 103.588 K Factor= 28.33 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 _ _ _ Fire Prakeckian �y Compuker Design Central Fire Protection 10775 E. 51 st Ave. Denver, CO 80239 (303) 576-8157 Job Name : Vail Public Library Remodel Galleria 103 Calc Building : FP3 Location : 292 West Meadow Drive, Vail, Colorado 81657 System : 4 Contract : 284212 Data File : Vail Public Library Remodel Main Level Calc AREA 4.wxf I attest to the accuracy and integrity of this � ___� document Marvin Heath, SET This fire sprinkler system hydraulic Central Fire Protection Contractors, �n�. calculation has been completed in NICET LevellV#079201 Fire Protection Engineering Technology/ compliance with NFPA, Local, &State Codes. Water-Based Systems Layout 2012.05.31 09:01:24-06'00' Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Central Fire Protection Page 1 Vail Public Library Remodel Galleria 103 Calc Date 05/30/2012 HYDRAULIC CALCULATIONS for Project name: Vail Public Library Remodel Location: 292 West Meadow Drive, Vail, Colorado 81657 Drawing no: FP3 Date: 05/30/2012 Design Remote area number: 4 Remote area location: Galleria 103 Occupancy classification: Light Hazard Density: 0.10 - Gpm/SqFt Area of application: 973 - SqFt Coverage per sprinkler: 145- SqFt Type of sprinklers calculated: QR Upright Sprinklers No. of sprinklers calculated: 17 In-rack demand: 0 - GPM Hose streams: 100 - GPM Total water required (including hose streams): 450.643 - GPM @ 114.692 - Psi Type of system: Wet Volume of dry or preaction system: N/a - Gal Water supply information Date: 04/24/2012 Location: 22 West Meadow Drive, Vail, Colorado Source: Vail Fire Rescue Name of contractor: Central Fire Protection Contractors, Inc. Address: 10775 E. 51 st Ave., Denver, CO 80239 Phone number: 303-576-8157 Name of designer: Stephanie Pelster Authority having jurisdiction: Vail Fire Rescue Notes: (Include peaking information or gridded systems here.) A 10°/o reduction has been taken off of the original Static& Residual pressures of the flow test. See sheet FP1 for further information regarding the flow test. Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Water Supply Curve (C) Central Fire Protection Page 2 Vail Public Library Remodel Galleria 103 Calc Date 05/30/2012 City Water Supply: Demand: C1 - Static Pressure : 135 D1 - Elevation : 13.933 C2 - Residual Pressure: 130.5 D2 - System Flow : 350.643 C2 - Residual Flow : 1353 D2 - System Pressure : 114.692 Hose ( Demand ) : 100 D3 - System Demand : 450.643 Safety Margin : 19.719 150 140 2 130 P 120 R 110 3 E 100 S 90 S 80 � 70 R 60 E 50 40 30 20 10 200 400 600 800 1000 1200 1400 1600 1800 FLOW ( N " 1.85 ) Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Fittings Used Summary Central Fire Protection Page 3 Vail Public Library Remodel Galleria 103 Calc Date 05/30/2012 Fitting Legend Abbrev. Name Yz '/4 1 1'/< 1'/z 2 2Yz 3 3'/z 4 5 6 8 10 12 14 16 18 20 24 B NFPA 13 Butterfly Valve 0 0 0 0 0 6 7 10 0 12 9 10 12 19 21 0 0 0 0 0 E NFPA 13 90'Standard Elbow 1 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 Fsp Flow Switch Potter VSR Fitting generates a Fixed Loss Based on Flow G NFPA 13 Gate Valve 0 0 0 0 0 1 1 1 1 2 2 3 4 5 6 7 8 10 11 13 T NFPA 13 90'Flow thru Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121 Units Summary Diameter Units Inches Length Units Feet Flow Units US Gallons per Minute Pressure Units Pounds per Square Inch Note: Fitting Legend provides equivalent pipe lengths for fittings types of various diameters. Equivalent lengths shown are standard for actual diameters of Sched 40 pipe and CFactors of 120 except as noted with *. The fittings marked with a � show equivalent lengths values supplied by manufacturers based on specific pipe diameters and CFactors and they require no adjustment. All values for fittings not marked with a *will be adjusted in the calculation for CFactors of other than 120 and diameters other than Sched 40 per NFPA. Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Pressure / Flow Summary - STANDARD Central Fire Protection Page 4 Vail Public Library Remodel Galleria 103 Calc Date 05/30/2012 Node Elevation K-Fact Pt Pn Flow Density Area Press No. Actual Actual Req. S1 27.17 5.6 7.0 na 14.82 0.1 145 7.0 S2 27.17 5.6 7.9 na 15.74 0.1 145 7.0 S3 27.17 5.6 11.32 na 18.84 0.1 145 7.0 S4 27.17 5.6 13.5 na 20.58 0.1 145 7.0 S5 27.17 5.6 17.67 na 23.54 0.1 145 7.0 S6 27.17 5.6 9.48 na 17.25 0.1 145 7.0 S7 27.17 5.6 10.82 na 18.42 0.1 145 7.0 S8 27.17 5.6 15.37 na 21.96 0.1 145 7.0 S9 27.17 5.6 18.28 na 23.94 0.1 145 7.0 23 27.17 22.43 na 24 18.375 35.84 na 25 18.375 47.16 na 26 8.92 52.74 na 22 8.92 55.32 na TOR 8.92 63.53 na BFO 3.71 72.69 na BFI 3.71 82.02 na PRO 3.71 84.81 na PRI 3.71 105.85 na BOR 3.71 107.28 na TEST -5.0 114.69 na 100.0 S10 27.17 5.6 8.6 na 16.43 0.1 145 7.0 S11 27.17 5.6 9.69 na 17.43 0.1 145 7.0 S12 27.17 5.6 13.82 na 20.82 0.1 145 7.0 S13 27.17 5.6 16.46 na 22.72 0.1 145 7.0 S14 27.17 5.6 21.48 na 25.96 0.1 145 7.0 S15 27.17 5.6 15.12 na 21.78 0.1 145 7.0 S16 27.17 5.6 16.95 na 23.06 0.1 145 7.0 S17 27.17 5.6 23.9 na 27.38 0.1 145 7.0 27 27.17 27.22 na 28 19.0 37.59 na 20 19.0 38.93 na 21 19.0 39.01 na 19 19.0 39.11 na 5 19.0 39.94 na 6 19.0 40.94 na 7 19.0 41.04 na 18 8.92 47.59 na The maximum velocity is 20.63 and it occurs in the pipe between nodes 22 and TOR Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams Central Fire Protection Page 5 Vail Public Library Remodel Galleria 103 Calc Date 05/30/2012 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn *WEST SIDE OF ATRIUM S1 14.82 1.049 0.0 12.000 7.000 K Factor= 5.60 to 120.0 0.0 0.0 0.0 S2 14.82 0.0747 0.0 12.000 0.896 Vel = 5.50 S2 15.73 1.049 0.0 12.000 7.896 K Factor= 5.60 to 120.0 0.0 0.0 0.0 S3 30.55 0.2850 0.0 12.000 3.420 Vel = 11.34 S3 18.84 1.38 0.0 12.000 11.316 K Factor= 5.60 to 120.0 0.0 0.0 0.0 S4 49.39 0.1822 0.0 12.000 2.187 Vel = 10.59 S4 20.58 1.38 0.0 12.000 13.503 K Factor= 5.60 to 120.0 0.0 0.0 0.0 S5 69.97 0.3472 0.0 12.000 4.166 Vel = 15.01 S5 23.54 1.61 1 T 8.0 9.000 17.669 K Factor= 5.60 to 120.0 0.0 8.000 0.0 23 93.51 0.2802 0.0 17.000 4.764 Vel = 14.74 0.0 93.51 22.433 K Factor= 19.74 S6 17.25 1.049 2E 4.0 9.500 9.485 K Factor= 5.60 to 120.0 0.0 4.000 0.0 S7 17.25 0.0989 0.0 13.500 1.335 Vel = 6.40 S7 18.42 1.049 0.0 12.000 10.820 K Factor= 5.60 to 120.0 0.0 0.0 0.0 S8 35.67 0.3795 0.0 12.000 4.554 Vel = 13.24 S8 21.95 1.38 0.0 12.000 15.374 K Factor= 5.60 to 120.0 0.0 0.0 0.0 S9 57.62 0.2424 0.0 12.000 2.909 Vel = 12.36 S9 23.95 1.38 1 T 6.0 3.000 18.283 K Factor= 5.60 to 120.0 0.0 6.000 0.0 23 81.57 0.4611 0.0 9.000 4.150 Vel = 17.50 23 93.51 2.067 1 E 5.0 11.250 22.433 to 120.0 2T 20.0 25.000 3.809 24 175.08 0.2648 0.0 36.250 9.599 Vel = 16.74 24 0.0 2.067 2E 10.0 22.750 35.841 to 120.0 1 T 10.0 20.000 0.0 25 175.08 0.2648 0.0 42.750 11.320 Vel = 16.74 25 0.0 2.635 1 E 8.237 10.000 47.161 to 120.0 0.0 8.237 4.095 26 175.08 0.0812 0.0 18.237 1.481 Vel = 10.30 26 0.0 2.635 1 E 8.237 7.170 52.737 to 120.0 1 T 16.474 24.711 0.0 22 175.08 0.0811 0.0 31.881 2.587 Vel = 10.30 22 175.56 2.635 2E 16.474 11.500 55.324 to 120.0 0.0 16.474 0.0 TOR 350.64 0.2934 0.0 27.974 8.208 Vel = 20.63 TOR 0.0 3.26 2E 18.815 5.210 63.532 to 120.0 1 Fsp 0.0 32.255 5.256 " Fixed loss = 3 BFO 350.64 0.1041 1 B 13.44 37.465 3.899 Vel = 13.48 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams Central Fire Protection Page 6 Vail Public Library Remodel Galleria 103 Calc Date 05/30/2012 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn BFO 0.0 3.26 0.0 3.170 72.687 to 120.0 0.0 0.0 9.000 * Fixed loss = 9 BFI 350.64 0.1041 0.0 3.170 0.330 Vel = 13.48 BFI 0.0 3.26 2E 18.815 6.670 82.017 to 120.0 1 G 1.344 20.159 0.0 PRO 350.64 0.1041 0.0 26.829 2.792 Vel = 13.48 PRO 0.0 3.26 0.0 10.000 84.809 to 120.0 0.0 0.0 20.000 * Fixed loss = 20 PRI 350.64 0.1040 0.0 10.000 1.040 Vel = 13.48 PRI 0.0 3.26 1 E 9.408 3.000 105.849 to 120.0 1 G 1.344 10.752 0.0 BOR 350.64 0.1041 0.0 13.752 1.431 Vel = 13.48 BOR 0.0 4.1 3E 32.783 50.000 107.280 to 120.0 1 T 21.855 56.824 3.772 TEST 350.64 0.0341 1 G 2.186 106.824 3.640 Vel = 8.52 100.00 Qa = 100.00 450.64 114.692 K Factor= 42.08 *EAST SIDE OF ATRIUM S10 16.43 1.049 0.0 12.000 8.603 K Factor= 5.60 to 120.0 0.0 0.0 0.0 S11 16.43 0.0904 0.0 12.000 1.085 Vel = 6.10 S11 17.43 1.049 0.0 12.000 9.688 K Factor= 5.60 to 120.0 0.0 0.0 0.0 S12 33.86 0.3446 0.0 12.000 4.135 Vel = 12.57 S12 20.82 1.38 0.0 12.000 13.823 K Factor= 5.60 to 120.0 0.0 0.0 0.0 S13 54.68 0.2199 0.0 12.000 2.639 Vel = 11.73 S13 22.72 1.38 0.0 12.000 16.462 K Factor= 5.60 to 120.0 0.0 0.0 0.0 S14 77.4 0.4184 0.0 12.000 5.021 Vel = 16.60 S14 25.95 1.61 1T 8.0 9.000 21.483 K Factor= 5.60 to 120.0 0.0 8.000 0.0 27 103.35 0.3372 0.0 17.000 5.733 Vel = 16.29 0.0 103.35 27.216 K Factor= 19.81 S15 21.78 1.049 0.0 12.000 15.123 K Factor= 5.60 to 120.0 0.0 0.0 0.0 S16 21.78 0.1523 0.0 12.000 1.828 Vel = 8.09 S16 23.05 1.049 0.0 12.000 16.951 K Factor= 5.60 to 120.0 0.0 0.0 0.0 S17 44.83 0.5793 0.0 12.000 6.952 Vel = 16.64 S17 27.38 1.38 1T 6.0 3.000 23.903 K Factor= 5.60 to 120.0 0.0 6.000 0.0 27 72.21 0.3681 0.0 9.000 3.313 Vel = 15.49 27 103.35 2.067 1 E 5.0 10.670 27.216 to 120.0 1 T 10.0 15.000 3.538 28 175.56 0.2661 0.0 25.670 6.832 Vel = 16.79 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams Central Fire Protection Page 7 Vail Public Library Remodel Galleria 103 Calc Date 05/30/2012 Hyd. Qa Dia. Fitting Pipe Pt Pt Ref. "C" or Ftng's Pe Pv ******* Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn 28 -33.32 2.067 1 T 10.0 9.170 37.586 to 120.0 0.0 10.000 0.0 7 142.24 0.1803 0.0 19.170 3.457 Vel = 13.60 0.0 142.24 41.043 K Factor= 22.20 28 33.33 2.157 3E 18.46 115.700 37.586 to 120.0 0.0 18.460 0.0 20 33.33 0.0100 0.0 134.160 1.342 Vel = 2.93 20 0.0 2.157 0.0 8.000 38.928 to 120.0 0.0 0.0 0.0 21 33.33 0.0100 0.0 8.000 0.080 Vel = 2.93 21 0.0 2.157 0.0 10.580 39.008 to 120.0 0.0 0.0 0.0 19 33.33 0.0100 0.0 10.580 0.106 Vel = 2.93 19 0.0 2.157 1 E 6.153 64.420 39.114 to 120.0 1 T 12.307 18.460 0.0 5 33.33 0.0100 0.0 82.880 0.828 Vel = 2.93 5 0.0 2.157 1 E 6.153 93.960 39.942 to 120.0 0.0 6.153 0.0 6 33.33 0.0100 0.0 100.113 1.001 Vel = 2.93 6 0.0 2.157 1 E 6.153 3.830 40.943 to 120.0 0.0 6.153 0.0 7 33.33 0.0100 0.0 9.983 0.100 Vel = 2.93 7 142.23 2.157 0.0 10.080 41.043 to 120.0 0.0 0.0 4.366 18 175.56 0.2163 0.0 10.080 2.180 Vel = 15.41 18 0.0 2.157 2E 12.307 23.460 47.589 to 120.0 0.0 12.307 0.0 22 175.56 0.2163 0.0 35.767 7.735 Vel = 15.41 0.0 175.56 55.324 K Factor= 23.60 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087