HomeMy WebLinkAboutB07-0198 inspectionsSecItem IdDescriptionApprReqItemsActionInheritable *10 BLDG-FOOTINGYesO2APNo *20 BLDG-Foundation/Steel YesO1APNo *21 PLAN-ILC Foundation Plan YesR1APNo *30 BLDG-Framing YesO9APNo *22 PLAN-ILC FRAMINGYesR1APNo *50 BLDG-Insulation YesO3APNo *60 BLDG-Sheetrock Nail YesO2APNo *539 PW-FINAL C/O YesO2APNo *537 PLAN-FINAL C/O YesO3APNo *540 BLDG-Final C/O YesO2APNo *560 ELEV-Final YesR1APNo Total Rows: 11 Page 1 Inspection Items for B07-019808:34 04/05/2012 ActionComments ByDateUnique_ Key AP MH01/16/2009A000121 969 Total Rows: 1 Page 1 B07-0198: Entries for Item:560 - ELEV-Final 08:36 04/05/2012 ActionComments ByDateUnique_ Key DNM,P PERMITS REQUIRE FINAL INSPECTIONS CALL FROM REINSPECTION, JRM10/02/2008A000118 258 AP JRM10/08/2008A000118 471 Total Rows: 2 Page 1 B07-0198: Entries for Item:540 - BLDG-Final C/O 08:36 04/05/2012 ActionComments ByDateUnique_ Key DNrear retaining wall exceeds 6 feet in height, no shingles on roof, vent/conduit/meter painting not completed bgibson08/22/2008A000116 892 DNroof shingles not completedbgibson09/16/2008A000117 655 AP bgibson10/02/2008A000118 296 Total Rows: 3 Page 1 B07-0198: Entries for Item:537 - PLAN-FINAL C/O 08:36 04/05/2012 ActionComments ByDateUnique_ Key DNRetaining wall at the NE corner exceeds 6 feet. cdelles08/21/2008A000116 841 APOwner installed a planter in front of the wallcdelles09/19/2008A000117 799 Total Rows: 2 Page 1 B07-0198: Entries for Item:539 - PW-FINAL C/O 08:36 04/05/2012 ActionComments ByDateUnique_ Key APFIREPLACE CHASE GYP GREATROOM AND LOFT GCD01/29/2008A000110 844 APDrywall screws approved, no corrections.JGG04/02/2008A000112 257 Total Rows: 2 Page 1 B07-0198: Entries for Item:60 - BLDG-Sheetrock Nail 08:36 04/05/2012 ActionComments ByDateUnique_ Key CRSPRAY-ON INSULATION IN ATTIC DOES NOT MEET IGNITION BARRIER REQUIREMENT PER ES-4.2. INSULATION CERTIFICATE RECEIVED FOR FILE. SHAHN03/18/2008A000111 917 CRTHE ATTIC HAS SPRAY FOAM INSULATION. AN IGNITION BARRIER IS REQUIRED PER THE ES REPORT AND ALSO IRC 314. THE CEILING INSULATION IS NOT ON APPROVED PLANS AND MAY BE AN ISSUE BY CAUSING A COLD ATTIC. shahn03/19/2008A000111 941 AP jrm10/07/2008A000118 416 Total Rows: 3 Page 1 B07-0198: Entries for Item:50 - BLDG-Insulation 08:35 04/05/2012 ActionComments ByDateUnique_ Key AP bgibson02/22/2008A000111 336 Total Rows: 1 Page 1 B07-0198: Entries for Item:22 - PLAN-ILC FRAMING08:35 04/05/2012 ActionComments ByDateUnique_ Key NOILC REQUIRED LEFT MESSAGE AT GC # 376-2020 8:35 A.M. JRM02/08/2008A000111 055 NONOTIFIED MIKE YOUNG THAT FRAMING CANNOT BE DONE UNTIL ILC IS APPROVED. FIREPLACE CORRECTIONS NOT APPROVED. shahn02/21/2008A000111 313 DNDENIED ... A FIRE ALARM AND SPRINKLER PERMIT AND INSPECTIONS ARE REQUIRED. JRM02/26/2008A000111 393 DNNO SPRINKLER ALARM HAS BEEN APPROVED OR APPLIED FOR ON THIS HOUSE.. FRAMING DENIED UNTIL ALL INSPECTIONS ROUGHS ARE APPROVED JRM03/07/2008A000111 696 NONO SPRINKLER REQUIRED OK TO INSPECT FRAMING JRM03/11/2008A000111 755 NOSTILL NEED TO REINSPECT FIREPLACE CORRECTIONS. NOTIFIED MIKE YOUNG THAT MECH DUCTWORK PERMIT HAS NOT BEEN ISSUED. shahn03/11/2008A000111 758 CRNEED LETTER FROM STRUCTURAL ENGINEER : 1) AREAS COVERED WITH FOAM INSULATION HAVE BEEN APPROVED BY ENGINEER. 2) MISSING THRU BOLTS IN MASTER BEDROOM. 3) MISSING JOIST BLOCKING IN GUEST MASTER. 4) MISSING HSS3X3X3-3/16 IN GUEST MASTER BATH. PROVIDE INFORMATION ON FOAM INSULATION TO ADDRESS IF THERMAL BARRIER IS REQUIRED IN ATTIC SPACE. NAIL PROTECTION REQUIRED IN SEVERAL PLACES FOR FLEX DUCT, PVC PIPING AND ELECTRICAL. INSULATE HOT AND RECIRC WATER PER IECC. REMOVE SCREWS FROM CLOTHES DRYER DUCT PER IMC. SHAHN03/12/2008A000111 794 CRINSULATION HAD ALREADY STARTED, COVERING WORK. ITEMS FROM PREVIOUS FRAMING INSPECTION NOT CORRECTED/INSPECTED, SUCH AS SCREWS REMAIN IN DRYER DUCTS, MISSING NAIL PROTECTION FOR ELECTRICAL CABLE, HOT/RECIRC NOT INSULATED. STOPPED INSPECTION. INFORMED TODD TO REMOVE AS REQUIRED TO INSPECT DRYER DUCT AND WATER INSULATION. SHAHN03/14/2008A000111 859 APFRAMING APPROVED. RECEIVED LETTER FROM STRUCTURAL ENG DATED 3/17/08. SHAHN03/18/2008A000111 916 Total Rows: 9 Page 1 B07-0198: Entries for Item:30 - BLDG-Framing 08:35 04/05/2012 ActionComments ByDateUnique_ Key AP bgibson02/22/2008A000111 335 Total Rows: 1 Page 1 B07-0198: Entries for Item:21 - PLAN-ILC Foundation Plan 08:35 04/05/2012 ActionComments ByDateUnique_ Key APsee footer notesjrm10/07/2008A000118 417 Total Rows: 1 Page 1 B07-0198: Entries for Item:20 - BLDG-Foundation/Steel 08:35 04/05/2012 ActionComments ByDateUnique_ Key CRSOILS REPORT RECEIVED. NORTH COUNTERFORT IS NOT PER PLAN REQS ADDITIONAL MAT AND 7 #6, BULK HEAD OFF AND REINSPECT. REST OF FOOTING IS APPRVED UFER GROUND IN SE CORNER GCD08/30/2007A000104 323 APfoundation walls approved. The revised entrance stairway was brought into comdev and approved. shahn09/13/2007A000104 864 Total Rows: 2 Page 1 B07-0198: Entries for Item:10 - BLDG-FOOTING08:34 04/05/2012