HomeMy WebLinkAboutB12-0245Department of Community Development
75 South Frontage Road
TOWN OF VAIL i Vail, CO 81657
Tel: 970.479.2128
www.vailgov.com
Development Review Coordinator
TRANSMITTAL FORM
Use this form when submitting additional information for planning applications or building permits
This form is also used for requesting a revision to building permits. A two hour minimum building review
fee of $110 will be charged upon reissuance of the permit.
Application /Permit #(s) information applies
to: Attention:
( )Revisions
Project Street Address:
)Ioqq c-44— p z>
(Number) (Street) (Suite #)
Building /Complex Name:
Applicant. Information
(architect, contractor, owner /owner's rep)
Contact Name: _C,-A
Address: PQ
City U f J ,101_)� �, State: �.Q zip: 4 J (P
( ) Response to Correction Letter
_attached copy of correction letter
O Deferred Submittal
0,Nther 1�-/CaA,L, 1,j5Pi 4: 170,l
Description of Transmittal/ List of Changes, Items Attached:
Contact Name: V (use additional sheet if necessary)
Contact Phone: Building Permits:
SPA-
/LL Ei'T7 G) J <
j)��
Contact E -Mail: Nevised ADDITIONAL Valuations (Labor &Materials)
(DO NOT include original valuation)
I hereby acknowledge that I have read this application, filled out Building:
in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to Plumbing:
comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according Electrical:
to the town's zoning and subdivision codes, design review ap-
proved, International Building and Residential Codes and other Mechanical:
ordinances the T cable thereto.
X Total:
Owner /Owner's RepresentatiVe Signature (Required)
For Office Use Only:
Fee Paid:
Received From:
Cash
CC: Visa / MC Last 4 CC #
Authorization #
Check #
exp. date:
Date Received:
I
R1
$-
CCQ[P=
D
0EC 0 5 2013
TOWN OF VAIL
TOWN OF
FINAL REPORT OF SPECIAL INSPECTIONS
Project: u-P.D t v�q p-<- j�J�, . Permit Number:
Project Location: 162 R � �jLL4 -.(-�k r' (1Ife -I'll V D494 . Ve. i / , &jjca t ez
Owner /Address �7plo, pia -':IiQ (', 1Z_ h . City: V,4-t L.. Zip:
Design Professional In Charge:704k,11F, k A 4n,,4a pt_
Address:
0v4n[ I
City: � 1Gkt ovo l S 0 1 1 t vim, g State: Zip: � Phone: q
Fax: q —70 E -mail:
To the best of my information, knowledge, and belief, the special inspections and /or testing required for
this project, have been completed in accordance with the contract documents.
Interim reports submitted prior to this Final Report of Special Inspections form a basis for, and are to be
considered an integral part of this final report. Any discrepancies that were noted in all interim reports
have been corrected.
Prepared by.
Type or P t Name
ignature
q —t
Date
Preparer's Seal and Signature Required
DEC o 5 2013
TOWN OF VAIL
*vlq Too OF
FINAL REPORT OF SPECIAL INSPECTIONS
Project: K &A P i� e-c l "� r C Permit Number: IQ
Project Location: i' to 11 � J13d� ' }�,(` (�,teC__ k 12 OOA , V& ; % , &P10.e es
Owner /Address t^? ©(o, (,{LLf Jf _1Z City: VA- l L Zip: SJ (LS-7
Design Professional In C
Address:
avad, I
City: G-TGh 1. V0cL S .b r t vvn S State: 6�2 Zip: i562L Phone:' 701N`J %q W
Fax: q 70 4;; E -mail: epkcl t
To the best of my information, knowledge, and belief, the special inspections and /or testing required for
this project, have been completed in accordance with the contract documents.
Interim reports submitted prior to this Final Report of Special Inspections form a basis for, and are to be
considered an integral part of this final report. Any discrepancies that were noted in all interim reports
have been corrected.
AAJ pep " C)AI ��� '4f
Prepared by: %da1���e;
Preparer's Seal and Signature Required
DEC OS 2013
TOWN OF VAIL
v
12 -04 -2013 Inspection Request Reporting Page 8
4:09 nm Mail, CO City Of
Requested Inspect Date: Thursday, December 05, 2013
Site Address: 1699 BU Pc CREEK RD VAIL
A/P /D Information
Activity B12 -0245 �` Type: COMBO
Const TyL Oc pancy:
Own UPPPINGER, JORDAN
Contract JLL CONSTRUCTION C
Description: NEW SINGLE FAMILY RESIDENCE.
CANNOT BE ACCESSED BECAUSE
UPPER BENCH FIRST AND FOUND
CHECKED..B.YENGINEER.
n: 540 BLDG -Final C/O
)r: HILL CONSTRUCTION
:s: 390 -3413
o: JMONDRAGON
Inspection History
Item: 10
Item: 20
Item: 120
Item: 210
hem: 200
Item: 220
Item: 230
Sub Type: NSFR Status: ISSUED
Use: R -3 Insp Area:
Phone: 970 - 390 -3413
NOTE: OPEN HOLE SOILS REPORT AT EXCAVATION. SITE
OF B' RETAINING WALL. EXCAVATION IN TWO STAGES WITH
ATION. SOILS REPORT DONE BEFORE FOUNDATION WORK AND
Requested Time: 10:00 AM
970- 390 -3413
BLDG - FOOTING ** Approved **
09/27/12
Inspector: sgremmer
Action:
PI PARTIAL SPECTION
Comment:
garage slab
10/17/12
Comment:
inspector: sgremmer
Action:
AP APPROVED
upper
BLDG - Foundation /Steel ** Approved "
09/04/12
Comment:
Inspector: JRM
AS NOTED ON PLANS
Action:
PA PARTIAL APPROVAL
10/29/12
Comment:
Inspector: sgremmer
Action:
AP APPROVED
ELEC -Rou
h *' Approved **
10/09/12
Comment:
Inspector: sgremmer
Service
Action:
PI PARTIAL INSPECTION
06/06/13
Comment:
Inspector: sgremmer
Notch plate feeder under panel
Action:
DN DENIED
06/10/13
Comment:
Inspector: sgremmer
Action:
AP APPROVED
PLMB - Underground '* Approved *'
09/21/12
Comment:
Inspector: mdenney
Action:
AP APPROVED
11/13/12
Comment:
Inspector: Martin
upper level only
Action:
PI PARTIAL INSPECTION
06/05/13
Comment:
Inspector: sgremmer
Action:
AP APPROVED
MECH -Rough
h *' Approved '*
09/27/129
Comment:
Inspector: sgremmer
in floor heat at garage slab
Action:
PI PARTIAL INSPECTION
11/16/12
Comment:
Inspector: JRM Action:
UPPER LEVEL IN FLOOR HEAT 100 # AIR
PI PARTIAL INSPECTION
TEST
06/05/13
Comment:
Inspector: sgremmer
Action:
AP APPROVED
PLMB - Rough /D.W.V. " Approved "
06/05/13
Comment:
Inspector: sgremmer
Action:
AP APPROVED
PLMB- Rough/Water ** Approved *'
11/13/12
Comment:
Inspector: Martin
Upper level only and underground
Action:
PI PARTIAL INSPECTION
06/05/13
Comment:
Inspector: sgremmer
Action:
AP APPROVED
JMONDRAGON
\ti'
REPT131 Run Id: 14721
w
Department of Community Development
75 South Frontage Road
TOWN OF ���� < Vail, CO 81657
Tel: 970 - 479 -2128
www.vailgov.com
Development Review Coordinator
TRANSMITTAL FORM
Revision Submittals:
1. "Field Set" of approved plans MUST accompany revisions.
2. No further inspections will be performed until the revisions are approved & the permit is re- issued.
3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance.
Permit #(s) information applies to: Attention: ( ) Revisions
�1 ( ) Response to Correction Letter
_attached copy of correction letter
( ) Deferred Submittal
( ) Other
Project Street Add s:
(Number) (St t) (Suite #)
Building /Complex Name:
Contractor Information
Business Name: ✓l/O(�� �d�U/J
Business Address: � 334 Z
City t State: �� Zip:
Contact Name:
Contact Phone: 3
Contact E -Mail: —6&14 �► /Jyd"% r;7 it &USX/. CO A,*
I hereby acknowledge that I have read this application, filled out
in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to
comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according
to the town's zoning and subdivision codes, design review ap-
proved, I temational Building and Residential Codes and other
ordina s of the wn PIplicable thereto.
X
Owner /Owner's Representative Signature (Required)
Applicant Information
Applicant Name: l/ —Vkw/ t(.%
Applicant Phone: 0
Applicant E -Mail: Sfi/yiVay U-.0t Z
For Office Use Only:
Fee Paid:
Received From:
Cash — Check #
CC: Visa / MC Last 4 CC # exp. date:
Auth #
Description / List of Changes:
�"Yr Ito e44r
efiv r
(use additional sheet if necessary)
Revised ADDITIONAL Valuations (Labor & Materials)
(DO NOT include original valuation)
Building: $
Plumbing: $
Electrical: $
Mechanical: $
Total: $
Date Received:
JUL 09 2012
WC !o.'YI
TOWN OF VAIL
TOWN OFYAII.V
JUL 09 2012
ti I
TOWN OF VAIL
Job Name: ,�,J_ �udl
Job Address: i n k j o
Permit No.: Z
SPECIAL INSPECTION AND TESTING AGREEMENT
(To applicants of projects requiring Special Inspection or Testing per Section 1701 of the IBC)
The owner or his /her representative, on the advice of the design professional in responsible charge, shall
complete, seal, sign and submit a copy of the Special Inspection Agreement and Structural Tests
Scheduled to the Town of Vail for review and approval. Signatures are required on both pages;
photocopied or faxed signatures are acceptable.
The owner and his /her general contractor, where applicable, shall also acknowledge the following
conditions applicable to Special inspection Testing:
1. Contractor is responsible for proper notification to the Inspection or Testing agency for items
listed.(Page 1) (IBC 1704)
2. Only the testing laboratory should take samples and transport them to their laboratory.
3. Copies of all laboratory reports and inspections are to be sent directly to the Town of Vail by the Testing
agency on a weekly basis.
4. Inspection agency to submit names and qualifications of on -site special inspectors to the Town of Vail
for review and approval.( Page 2)
5. The special inspector is responsible to immediately notify the Town of Vail Building Official in writing of
any concerns and /or problems encountered.
6. It is the responsibility of the contractor to review the Town of Vail approved plans for additional
inspection or testing requirements that may be noted. A pre- construction conference at the job site is
recommended to review special inspection procedures.
7. The special inspector shall use only the Town of Vail approved drawings.
8. All special inspection field reports must be left on site for review by the Town of Vail staff prior to
required inspections or re- inspections.
BEFORE OCCUPANCY WILL BE GRANTED: The special inspection agency shall submit a signed and
sealed statement that all items requiring testing and inspection were fulfilled and reported. Those items not
tested and /or inspected shall be noted in this statement. A copy of the statement shall be maintained at the
job site for the Building Inspector's review prior to final inspection.
Acknowledgement:
Owner:
U okimA1 L u ODi tlge_ t ' /_l /Z-
Print Nam ate
Special Inspection,
Agency.
ignature Print Mame I ate
Project
Arch /Eng: _�y� .�.Rw tuy ?Z9 /z
gnature Print Name _ A ate
Contractor: ow IIU �lw
Signature Print Name fDate
-3-
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
TOWN ovo'
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
COMBINATION BLDG PERMIT Permit #: B12 -0245
Project #: PRJ12 -0169
Job Address: 1699 BUFFEHR CREEK RD VAIL Applied.....: 06/15/2012
Location......: Issued...: 07/09/2012
Parcel No....: 210312215004
OWNER KUPPPINGER, JORDAN
1706 BUFFEHR CREEK RD
VAI L
CO 81657
APPLICANT DAVID LAWRENCE IRWIN
PO BOX 3342
VAI L
CO 81658
CONTRACTOR NOVA GROUP, THE
PO BOX 3342
VAI L
CO 81658
License: 1040 -B
06/15/2012
06/15/2012 Phone: 970-390-0931
07/09/2012 Phone: 970-390-0931
Description:
NEW SINGLE FAMILY RESIDENCE. NOTE: OPEN HOLE SOILS REPORT
AT EXCAVATION. SITE CANNOT BE ACCESSED BECAUSE OF 8'
RETAINING WALL. EXCAVATION IN TWO STAGES WITH UPPER BENCH
FIRST AND FOUNDATION. SOILS REPORT DONE BEFORE FOUNDATION
WORK AND CHECKED BY ENGINEER.
Occupancy: R -3 Type Construction: VB
Valuation: $641,700.00
........... ........................,....., .. .....,..<............
FEE SUMMARY ......,..............,,... ,....,......................,.. .......... ....»
Building Permit ------ - - - - ->
$3,908.25
Bldg Plan Check ----- - - - - -> $2,540.36
Use Tax Fee------------------ - - - - ->
$12,634.00
Electrical Permit ---- - - - - ->
$414.00
Elec Plan Check ------ - - - - -> $269.10
Restuarant Plan Review--- - - - - ->
$0.00
Mechanical Permit - - - - - ->
$400.00
Mech Plan Check ---- - - - - -> $100.00
Additional Fees--------------- - - - - ->
$0.00
Plumbing Permit --- - - - - ->
$240.00
Plmb Plan Check ---- - - - - -> $60.00
Recreation Fee--------------- - - - - ->
$1,062.00
Investigation------------------ - - - - ->
$0.00
Will Call ------------------------------ >
$20.00
TOTAL PERMIT FEES--------- - - - - ->
$21,647.71
Payments ------------------------------- >
$21,647.71
BALANCE DUE ------------------------ >
$0.00
DECLARATIONS
I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and
other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY -FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149
OR AT OUR OFFICE FROM 8:00 AM - 4:00 PM.
combination permit_012811
4FLPM5 �WN
CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF
Permit #: B12 -0245
Owner: KUPPPINGER, JORDAN
combination permit_012811
Address: 1699 BUFFEHR CREEK RD VAIL
Location:
WN *VAIL
REQUIRED INSPECTIONS AND STATUSES
Permit #: B12 -0245
Owner: KUPPPINGER, JORDAN
Address: 1699 BUFFEHR CREEK RD VAIL
Location:
Item: 00010 BLDG - FOOTING
Item: 00020 BLDG - Foundation /Steel
Item: 00120 ELEC -Rough
Item: 00210 PLMB- Underground
Item: 00200 MECH -Rough
Item: 00220 PLMB- Rough /D.W.V.
Item: 00230 PLMB- Rough/Water
Item: 00240 PLMB -Gas Piping
Item: 00310 MECH- Heating
Item: 00340 MECH -Misc.
Item: 00410 Special Inspect - progress rept
Item: 00030 BLDG - Framing
Item: 00050 BLDG - Insulation
Item: 00060 BLDG - Sheetrock Nail
Item: 00070 BLDG -Misc.
Item: 00190 ELEC -Final
Item: 00290 PLMB -Final
Item: 00390 MECH -Final
Item: 00420 Special Inspect -final rept
Item: 00022 PLAN -ILC FRAMING
Item: 00540 BLDG -Final C/O
Item: 00542 PLAN -FINAL
Item: 00090 BLDG -Final
combination permit-012811
TOWN OF VAIL, COLORADO Statement
Statement Number: R120000875 Amount: $19,108.2707/09 /201210:27 AM
Payment Method: Check Init: WC
Notation: Check Number
11673
Permit No: B12 -0245 Type: COMBINATION BLDG PERMIT
Parcel No: 2103 - 122 - 1500 -4
Site Address: 1699 BUFFEHR CREEK RD VAIL
Location:
Total Fees: $21,647.71
This Payment:
$19,108.27 Total ALL Pmts:
$21,647.71
Balance:
$0.00
************************************************************* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
ACCOUNT ITEM LIST:
Account Code
Description
Current Pmts
--------------
BP
- - - - --
00100003111100
------------------------ - - - - --
BUILDING PERMIT FEES
------ - - - ---
3,908.25
EP
00100003111100
ELECTRICAL PERMIT FEES
414.00
MP
00100003111100
MECHANICAL PERMIT FEES
400.00
PF
00100003112300
PLAN CHECK FEES
430.02
PP
00100003111100
PLUMBING PERMIT FEES
240.00
RF
11.100003112700
RECREATION FEES
1,062.00
UT
11000003106000
USE TAX 40
12,634.00
WC
00100003112800
WILL CALL INSPECTION FEE
20.00
TOWN Of VA
1�
J
j
Department of Community Development
75 South Frontage Road
Vail, CO 81657
Tel: 970 - 479 -2128
www_vailgov.com
Development Review Coordinator
BUILDING PERMIT APPLICATION
(Separate applications are required for alarm & sprinkler)
._........ _........
Project Street nnAddress: /�
I /_ G G F� „t�t-P.�Q d` C
(Number) (Street) n� (Suite #)
jBuilding /Complex Name: k ?).a�1,uQp0 R65, ve -drop- _
Contractor Information
Project #: i
Building Permit #: B” �C "� C/5
Lot #: Block # Subdivision:
Business Name: l� 11f 0 Illy 6 tR 0 uid
Work Class: New (X Addition ( ) Alteration ( )
Business Address: _ &Q x �q Z
City
Type of Building:..._. _ -..
�/� State: Ga• Zip: Q(6$8
Single Family (X) Duplex ( ) Multi - Family ( )
Contact Name: LV Ito Commercial ( Other( )
Q�d- 3U -D43! -
Contact Phone: _ .. .._ ___ _ _.
Work Type: Interior ( ) Exterior ( ) Both (x)
Contact E -Mall: -cWA an tj Ts '" W,
--- _...----- ._.._..- .._...._.. .
I hereby acknowledge that I have read this application, filled out Valuation of
in full the information required, completed an accurate plot plan, Work Included Plans Included Work
and state that all the information as required is correct. I agree to
comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according to
the town's zoning and subdivision codes, design review ap-
proved, International Building and Residential Codes and other
ordinances of the Town applicable thereto.
X Aaw
Owner /Owner's Representative Signature (Required)
A )Yes
Mechanical
(x )Yes (
)No
(.,., )Yes (
)No U 'CJG
Plumbing
(X )Yes (
)No
C )Yes (
)No
Building
(X)Yes (
)No
(y._)Yes (
)No
Value of all work being performed: $ (,411700
(value based on IBC Section 109.3 & IRC Section 108.3)
Electrical Square Footage :�J-4'Z4_
Applicant Information ! Detailed Scope and Location of Work: A) U) bi&!9LE
Applicant Name: Q�1r "T-k lw gAa_Aae
Applicant Phone: 390 - O Ct *6 I j �JQT ; OaCIA
!ApplicantE -Mail: SN n oFi`G 2 dX 56U•LoM _'i BXG,9lJ19- T1ntk)) Z 116 C AIAOT Ibo, Ar -cabbed
Project Information '/ _�PC /�U S t✓ 8 'rA till lWG U1 a ll/ {k• X CG4 P9100u,
Owner Name:
�oILAAW leo Two 5r(>�,C�S �r�/J�E12, � dl Ut "t"'Ip.o
Parcel #: 210 l 2 2 l 600!!4
9 r /I p,
(For Parcel #, contact Eagle county Assessors office at (970- 328 -8640 or visit ` Did i✓�l �CDAI �DC S 1(Gl%OQ A ((A1
www.eaglecounty uslpatie) -�QtJ�l9 R (�(ON (Jll OQ f�
___._.__... _... ,._ ___ _ ... _ .__. _... _._. - _..__. - - -- - (use additional sheet if necessary) 11.1
For Office Use Only:
Fee Paid:
Received From:
Cash Check # -
CC: Visa / MC Last 4 CC #
Auth #
exp date:
Date Received:
i1-p- [E
../'(((1UN 15 2012
TOWN OF "VAIL 115- Mar -2012
mom
E -malt: sn@Mutofit2(&rnsn com
website: www.1U- NovaGroup.cwm
David Lawrence Irwin
P.O. Box 3342
Vail, Cokndo 81658
July 2, 2012
To: . Vail
Attn: Building Department
From: David Irwin/The Nova Group Letter of Record
Subject: Building Comments Response
Re: B12 9 #— OZ-q5 OWE
To Whom It May Concern:
• F�JUL 0 2 cult
1. All sheets will be sealed and signed by registrant. 1 TOWN OF VAIL
2. Who is the site engineer for this Project?
Hepworth - Pawlak Geotecchnical,Inc. and Dale Wibbenmeyer
A. Impact of surcharges by the new building and drainage on the existing retaining walls.
J
' A section of this existing wall is proposed to be removed for a driveway and be rebuilt to die into
new building. All new proposed footings for the proposed building are located lower in elevation
compared to the bottom of the existing retaining wall therefore there will be no extra loading or
i surcharges against the existing retaining wall. The drainage will remain the same or be less of an
impact to exiting retaining wall. ( as per Jeff Leonardo)
B. How is the existing wall structure integrity to be maintained during excavation?
Where excavation is being done the wall is being removed. The upper cut excavation is far enough
away where it will have no impact on existing retaining wall. ( as per Ted Johnson: excavator)
C. Provide details and design for the proposed boulder walls as required by the Town of Vail
amendments to the building code.
Details and design located on Landscape Plan Sheet. (as per Dale Wibenmeyer: engineer)
D. Provide design for the proposed disturbance fence.
Distuubance fence location is shown on Site Plan and will be Standard orange web plastic with 4'
steel landscape stakes to secure every 20'. ( as per David Irwin: General Contractor)
Sheet A2 — Item # 1. How is drainage being provided adjacent to doors and stairs.
All doors will be min. of 3" above outside surface treatment. All outside stairs will have min. '/4" per
foot drainage and away from stairs.
Sheet A2.1— Item #1. Provide details and plank for required Radon system per Town of Vail,
amendments. Inchtde in electrical plan.
Have shown location of Radon System on Sheets C 1, E1, E2, A2 and A2.1. This System will be wired.
Sheet A2.1- Item #2. Show rise and run on entry stairs.
Have shown rise @ 73/4" and run @ 11 '/4 " on sheet A2.
3. Sheet A2.1- Item #3. Rise on the stairs to be a maximum of 7 %" per IRC 2009. Revise plans.
Stairs have a rise between 7 �V2" and 7 '/4" max. per IRC 2009.
4. Sheet A2.1- Item # 4. Provide cross section of proposed stairs showing compliance for guards and
handrails to include cross - sectional criteria.
Cross section of stairs on C I showing compliance for guards and handrails. Continuous handrail @
36" height and size per IRC 2009
Shed A2.1- Item #S. Plans to identify fire rating between garage and living space to include how
penetrations are to be addressed. See mechanical and electrical equipment pen "ing fire walls.
Include details.
The walls will have 5/8" `X' firerock in garage with R -21 in walls and R- 30 foil faced insulation in
ceiling which will establish a one hour fire rating. All other penetrations will be closed foam sprayed.
6. Sheet A2.1- Item #6. Provide rescheck showing compliance with the 2009 IECC. Plans are required
to reflect energy calculations. Include u values for window fenestration on plans. See Town of Vail
Amendments requiring a maximum of .30 u value.
Energy Calculations have been posted on sheet M1.The u values ( .27 -.30 )for window fenestration
and posted on sheet A2 -1. (Energy cal. Per Mr.Heat @ 110,423 BTU'S)
7. Sheet A2.1 - Item # 7. Plans to include annotation that the NCFR certificate label to be on glazing at
time of rough inspection.
This NCFR certificate label has born noted on sheet C 1.
AJt
1 Sheet A2.3 - Item #1. Plans to reflect ceiling height of loft conforming minimum ceiling heights per
the IRC.
This has been indicated to be 10 "6" ceiling height per the IRC and clouded.
Shed C 1 - Item # 1. Provide a detail for the proposed roof system to include weather protection. See
criteria for unvented roof systems within the Town of Vail amended ordinances.
This will be a Metal Roof or 40 year asphalt with ice & water shield ( Grace) over entire roof. The
unvented roof will have closed cell R-49 insulation.
2. Sheet C 1 - Item # 2. Please provide wall sections showing flashing, weep screed, weather protection,
and insulation are to be installed. The provided cross - section is lacking this information in several
areas.
These details are now shown on Sleet C 1.
Shed G1- Item #1. Provide complete gas piping plans. Only one level floor plan submitted.
This sheet shows all piping for all levels with length and rise. Will also show with sheet M1.
2. Sheet G 1— Item #2. Show building sewer, water, and gas supply location materials and depths on site
Plan.
All utilities already stubbed to lot. Just need to take to house about (40') Will rim according to 2009
code requirements.
Sheet M 1 — Item # 1. Provide mechanical plans for proposed project to include exhaust system
proposed for kitchen.
Have included sheet M 1 to plans. Exhaust hood 400 cf n will have a B vent pipe for external
ventilation.
1. Sheet E2 — Item # 1. Plans to reflect the required GFCI receptacles.
All outlets in garage, baths, kitchen and outside to be GFI protected.
2. Sheet E2 — Item #2. Plans to reflect the required AFCI circuits.
Every other outlet except for garage, baths, kitchen and outside to be AFCI circuits.
3. Sheet E2 — Item # 3. Plans to reflect the required CO /Smoke detectors.
The Carbon Monox Detector ( wired) one min. on each floor. The Smoke Detector (wired) in each
bedroom and each level.
4. Sheet E2 — Item #4. Provide electrical load calculations per Town of Vail submittal requirements.
Attached sheet and shown on Sheet E2.
Attached sheet and shown on Site Plan.
(as per David Irwin)
Attached sheet and shown on Landscape plan.
( as per Dale Wibenmeyer: engineer)
71y, Yours, .
David Irwin
esign
lutions .inc
E N G I N E E R I N G
Date:
06.27.12
To:
Martin A. Haeberle
Chief Building Official
Town of Vail
970.479.2138
ProiecViob Number.'
Kuppinger Residence
Letter of Record
Job # 0206 -12
PO BOX 2494
AVON, CO 81620
PH. 970.949.7100
FAX. 970.949.3377
This "Letter of Record" is in regards to the "Structural Comments" and "Public Works
Comments" for the above referenced project. The following comments from the Town of Vail are
followed by their remedies:
Structural Comments
SHEET S1:
1. Sheet S1 - Item # 1. The Town of Vail has amended the IRC to require the
structural design to be in accordance with the IBC. Revise general note.
The above has been adjusted and clouded on sheet S1.
Sheet S1 - Item # 2. Plans to reflect required special inspections per section
1704.1.1IBC.
Sheet S1 in the "General Notes" reflects any special inspections that may be
required per the local building departments requirements. At this time we feel that
there are no special inspections needed except a soil report as stated in the general
notes sheet S1.
3. Sheet S1- Item # 3. Provide details for the propose boulder walls.
Details for boulder walls shall be provided by a geotechnical engineer.
4. Sheet S1 - Item # 4. Clarify the loading proposed against the existing walls and
any possible surcharge.
A section of this existing wall is proposed to be removed for a drive way and rebuilt
to die into the new building. All new proposed footings for the proposed building are
located lower in elevation compared to the bottom of the existing retaining wall
f.
• Page 2 June 27, 2012
therefore we believe that there will be no extra loading or surcharges against the
existing retaining wall.
5. Sheet S1 - Item # 5. How is the stone walls to be laterally supported and how is
drainage being provided? See section 5 S1.
Detail 5 /S1 is a typical stone veneer support for a maximum height of 6-0. It is
supported on a steel angle with expansion anchors as described in the detail. All
waterproofing, flashing, and drainage requirements are per the architect.
6. Sheet S1- Item # 6. Soils to be included in the special inspection criteria due to the
soils investigation work has not been done per the applicant.
This is stated under the Foundation Design section in the General Notes on Sheet
S1.
SHEET S2:
Sheet S2 - Item # 1. For inspection purpose clarify driven pins referenced for
bearing walls. Manufacturer?
On sheet S1 we have noted under the Structural Wood Framing section in the
General Notes what drive pins should be used and this has been clouded.
SHEET S3:
Sheet S3 - Item # 1. Snow retention system to be designed by the structural
engineer per Town of Vail building code amendments. Revise plans to reflect the
required retention system.
Once a manufacturer, design and location have been specified by the architect our
office will provide structural details of how to connect it to the roof structure.
2. Sheet S3 - Item # 2. Plans do not reflect design for the proposed stairs. Please
provide.
This has been reflected and clouded.
Public Works Comments
Item # 1. Engineered stamped plans required for boulder walls.
Details for boulder walls shall be provided by a geotechnical engineer.
If you have any questions or concerns please call me at 970.949.7100.
1. All outlets in garage, baths, kitchen and outside to be GFI protected
2. Every other outlet except for garage, baths, kitchen and outside to be AFCI
circuits
3. Carbon Monox Detector (wired) one min. on each floor
4. Smoke Detector (wired) in each bedroom and each level
5. Electric load calculations:
lighting
small appliance & dishwasher
.Wuxlry
range
. dryer
. snowmelt
steam shower
future hot tub
Total =
6. Electric Meter Location (south/west corner)
200 amp 10 3w from Holy Cross
7. Exterior light location ( ) total 7
8. Total load with prewire for all 38.4 kw
5.9 kw
4.5 kw
1.5 kw
8.5 kw
5 kw
3 kw
5 kw
5 kw
38.4 kw
9. IRC 2009 code: 50% of all interior lighting fixtures to rated " High Efficiency"
10. Wire for Radon Exhaust per IRC Appendix F
1. Is the exterior perimeter of the structure less than 300 feet? (IFC 503.1.1)
The exterior perimeter is 254 feet.
2. If the structure perimeter is less than or equal to 300 ft., does the site provide for
year round access by foot? (IFC 504.1)
Yes the site has year round access.
3. Does the driveway between the staging area and the right-of-way comply with
Vail Town Code? (Chapter 14 -3, Vail Town Code)
Yes any fire could be fought from main street access.
4. Does the point of fire apparatus access comply with the min. staging requirements
per Vail Town Code? (Chapter 14 -4, Vail Town Code)
Yes the apparatus access complies.
5. Does the fire department access and staging comply with the Vail Municipal
requirements?
Yes there is access and staging per code.
6. Does the site have adequate fire flow from a min. of two fire hydrants within five
hundred feet of the approved fire staging? ( IFC 509.1)
Yes with one hydrant @ 401, one hydrant @ 250', one hydrant @ 320'
7. Does the structure meet the requirements for the Urban Wildfire Interface Code?
Yes there are no significant trees on this lot.
8. For structures two stories or less: Are all portions of the interior within thirty foot
line of sight of a max. of one hundred and fifty foot route of an approved hose lay
and have an approved monitored addressable fire alarm and detection system?
Yes within 30' line of sight. No fire alarm system, but a detection system only.
� I L ^Oit �1MY11\ f
1 �
J; I jjj
1( j
d ij1
�pp
r,7
w
4
Pty! r�fYelA�jE►Y1
.1 R..na AA9e
Tc ar C'aA»,,jwt -or-13
V L Q e-k P� E� T141 +�: �►
i`� � � Q� 1 • �i�MiZ iM
f
6�IG i
i#40 MgLL
flotmail Print Message
Jeld -Wen Thermal performance
From: Brad Wright (brad @abwdco.com)
Sent: Thu 6/28/12 3:23 PM
To: snapoutofit2 @msn.com
1 attachment
Nova Group - Kuppinger -Scott Jeld -Wen thermal performance 6- 28- 12.pdf (52.0 KB)
Dave,
Page 1 of 1
Please see attached thermal performance ratings on our product. All of our product
will be NFRC rated & labeled which is what the town wants to see.
Please review and let me know if you have any questions.
Please let me know if I can be of further assistance.
Thank You,
Brad Wright
ABWD -Alan- Bradley Windows and Doors, Inc.
970 -481 -3394 Cell
970 -524 -2201 Vail Valley Office
970 -524 -2203 Vail Valley Fax
970 -871 -6799 Steamboat Office
970 -871 -6798 Steamboat Fax
brad @abwdco.com
http: / /snl27w.sntl27.mail. live. coin /mail/PcintMessages .aspx ?cpids =857a34ae -c 167 -11 el -... 6/28/2012
Hotmail Print Message Page 1 of 1
1699 Buffehr Creek Road
From: Dave Young (dave @hpgeotech.com)
Sent: Wed 6/27/12 10:19 AM
To: Dave Irwin (snapoutofit2 @msn.com)
Dave; as per our discussion yesterday we will observe the foundation excavation to evaluate the
exposed soil bearing conditions for the proposed residence on Lot 4 on Buffehr Creek Road. I
will put together a services agreement for the project and send over to you. Let me know your
schedule. Thanks
Davis A. Yoama, P.E.
3aadar Project Pagiaacr
HEPWORTH- PAWLAK GEOTECHNICAL, INC.
5020 Camty Road 154
Gkowood Springs, CO 81601
Phone: ' 0• ' -7M O
Fax: 970 -945 -8454
W: / /snl27w.sntl27.nudl. live. com /maillPrintMessages .aspx ?cpids=dd8c573O- cO73 -1 ]e1 -b... 7/2/2012
CNJ(REScheck Software Version 4.4.3
Compliance Certificate
Project Title: KuppingerResidence
Energy Code:
2009 IECC
Location:
Vail, Colorado
Construction Type:
Single Family
Glazing Area Percentage:
14%
Heating Degree Days:
9248
Climate Zone:
6
Construction Site:
1699 Buffehr Creek Road
Vail, CO 81658
Permit # B12 -0254
Permit Date: 716/2012
Owner /Agent:
David Irwin
The Nova Group
P.O. Box 3342
Vail, CO 81658
970- 390 -0931
snapoutofit2 @msn.com
trade-off
_Con-�jii7,1_1t' Passes using UA Compliance: 2.5% Better Than Code Maximum UA: 553 Your UA: 539
The % Better or Worse Than Code index reflects how close to compliance the house is based on code tradeoff rules.
It DOES NOT provide an estimate of energy use or cost relative to a minimum -code home.
8/ca -Oc Y5
Designer /Contractor:
Tim Clark
The Nova Group
P.O.Box 3342
Vail, CO 81658
626- 233 -4837
ttclark @aol.com
Ceiling 1: Cathedral Ceiling
800 49.0 0.0 18
Ceiling 2: Flat Ceiling or Scissor Truss
1094 49.0 0.0 28
Wall 1: Wood Frame, 16" o.c.
3040 21.0 0.0 148
Window 1: Metal Frame:Triple Pane with Low -E
420 0.290 122
Door 1: Solid
24 0.260 6
Basement Wall 1: Solid Concrete or Masonry
1920 11.0 0.0 94
Wall height: 12.0'
Depth below grade: 12.0'
Insulation depth: 12.0'
Floor 1: Slab -On- Grade: Heated
160 11.0 123
Insulation depth: 2.0'
Compliance Statement: The proposed building design described here is consistent
with the building plans, specifications, and other
calculations submitted with the permit application. The proposed building has been designed to meet the 2009 IECC requirements in
REScheck Version 4.4.3 and to comply with the mandatory requirements
led in the REScheck Inspection Checklist.
�1�A111� �RcUiuJ -- YG�C57 tV� �
c�%�:'Gl/�Z 7 l2
Name - Title Signature
Dat
Project Title: KuppingerResidence
Data filename: Untitled.rck
Report date: 07/05/12
Page 1 of 4
CNJ(REScheck Software Version 4.4.3
Inspection Checklist
Energy Code: 2009 IECC
Location: Vail, Colorado
Construction Type: Single Family
Glazing Area Percentage: 14%
Heating Degree Days: 9248
Climate Zone: 6
Ceilings:
❑ Ceiling 1: Cathedral Ceiling, R -49.0 cavity insulation
Comments:
❑ Ceiling 2: Flat Ceiling or Scissor Truss, R -49.0 cavity insulation
Comments:
Above -Grade Walls:
❑ Wall 1: Wood Frame, 16" o.c., R -21.0 cavity insulation
Comments:
Basement Walls:
❑ Basement Wall 1: Solid Concrete or Masonry, 12.0' ht / 12.0' bg / 12.0' insul, R -11.0 cavity insulation
Comments:
Windows:
❑ Window 1: Metal Frame:Triple Pane with Low -E, U- factor: 0.290
For windows without labeled U- factors, describe features:
#Panes Frame Type Thermal Break? Yes No
Comments:
Doors:
❑ Door 1: Solid, U- factor: 0.260
Comments:
Floors:
❑ Floor 1: Slab -On- Grade: Heated, 2.0' insulation depth, R -11.0 continuous insulation
Comments:
Slab insulation extends down from the top of the slab to at least 2.0 ft. OR down to at least the bottom of the slab then horizontally for a
total distance of 2.0 ft.
Air Leakage:
❑ Joints (including rim joist junctions), attic access openings, penetrations, and all other such openings in the building envelope that are
sources of air leakage are sealed with caulk, gasketed, weatherstripped or otherwise sealed with an air barrier material, suitable film or
solid material.
❑ Air barrier and sealing exists on common walls between dwelling units, on exterior walls behind tubs /showers, and in openings between
window /door jambs and framing.
❑ Recessed lights in the building thermal envelope are 1) type IC rated and ASTM E283 labeled and 2) sealed with a gasket or caulk
between the housing and the interior wall or ceiling covering.
❑ Access doors separating conditioned from unconditioned space are weather - stripped and insulated (without insulation compression or
damage) to at least the level of insulation on the surrounding surfaces. Where loose fill insulation exists, a baffle or retainer is installed
to maintain insulation application.
❑ Wood- burning fireplaces have gasketed doors and outdoor combustion air.
❑ Automatic or gravity dampers are installed on all outdoor air intakes and exhausts.
Air Sealing and Insulation:
Project Title: KuppingerResidence Report date: 07/05/12
Data filename: Untitled.rck Page 2 of 4
Building envelope air tightness and insulation installation complies by either 1) a post rough -in blower door test result of less than 7
ACH at 50 pascals OR 2) the following items have been satisfied:
(a) Air barriers and thermal barrier: Installed on outside of air - permeable insulation and breaks or joints in the air barrier are filled or
repaired.
(b) Ceiling /attic: Air barrier in any dropped ceiling /soffit is substantially aligned with insulation and any gaps are sealed.
(c) Above -grade walls: Insulation is installed in substantial contact and continuous alignment with the building envelope air barrier.
(d) Floors: Air barrier is installed at any exposed edge of insulation.
(e) Plumbing and wiring: Insulation is placed between outside and pipes. Batt insulation is cut to fit around wiring and plumbing, or
sprayed /blown insulation extends behind piping and wiring.
(f) Corners, headers, narrow framing cavities, and dm joists are insulated.
(9) Shower /tub on exterior wall: Insulation exists between showers /tubs and exterior wall.
Sunrooms:
F-I Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U- factor of 0.50 and the maximum
skylight U- factor of 0.75. New windows and doors separating the sunroom from conditioned space meet the building thermal envelope
requirements.
Materials Identification and Installation:
Materials and equipment are installed in accordance with the manufacturer's installation instructions.
F-1 Materials and equipment are identified so that compliance can be determined.
F1 Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided.
Li Insulation R- values and glazing U- factors are clearly marked on the building plans or specifications.
Duct Insulation:
Lj Supply ducts in attics are insulated to a minimum of R -8. All other ducts in unconditioned spaces or outside the building envelope are
insulated to at least R -6.
Duct Construction and Testing:
F-I Building framing cavities are not used as supply ducts.
Lj All joints and seams of air ducts, air handlers, filter boxes, and building cavities used as return ducts are substantially airtight by means
of tapes, mastics, liquid sealants, gasketing or other approved closure systems. Tapes, mastics, and fasteners are rated UL 181A or
UL 181B and are labeled according to the duct construction. Metal duct connections with equipment and /or fittings are mechanically
fastened. Crimp joints for round metal ducts have a contact lap of at least 1 1/2 inches and are fastened with a minimum of three
equally spaced sheet -metal screws.
Exceptions:
Joint and seams covered with spray polyurethane foam.
Where a partially inaccessible duct connection exists, mechanical fasteners can be equally spaced on the exposed portion of the
joint so as to prevent a hinge effect.
Continuously welded and locking -type longitudinal joints and seams on ducts operating at less than 2 in. w.g. (500 Pa).
F-1 Duct tightness test has been performed and meets one of the following test criteria:
(1) Postconstruction leakage to outdoors test: Less than or equal to 279.5 cfm (8 cfm per 100 ft2 of conditioned floor area).
(2) Postconstruction total leakage test (including air handler enclosure): Less than or equal to 419.3 cfm (12 cfm per 100 ft2 of
conditioned floor area).
(3) Rough -in total leakage test with air handler installed: Less than or equal to 209.6 cfm (6 cfm per 100 ft2 of conditioned floor area).
(4) Rough -in total leakage test without air handler installed: Less than or equal to 139.8 cfm (4 cfm per 100 ft2 of conditioned floor area).
Temperature Controls:
Where the primary heating system is a forced air - furnace, at least one programmable thermostat is installed to control the primary
heating system and has set - points initialized at 70 degree F for the heating cycle and 78 degree F for the cooling cycle.
F1 Heat pumps having supplementary electric- resistance heat have controls that prevent supplemental heat operation when the
compressor can meet the heating load.
Heating and Cooling Equipment Sizing:
❑ Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code.
F1 For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2009 IECC Commercial
Building Mechanical and /or Service Water Heating (Sections 503 and 504).
Circulating Service Hot Water Systems:
Circulating service hot water pipes are insulated to R -2.
Project Title: KuppingerResidence Report date: 07/05/12
Data filename: Untitled.rck Page 3 of 4
Circulating service hot water systems include an automatic or accessible manual switch to turn off the circulating pump when the
system is not in use.
Heating and Cooling Piping Insulation:
❑ HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R -3.
Swimming Pools:
❑ Heated swimming pools have an on /off heater switch.
Pool heaters operating on natural gas or LPG have an electronic pilot light.
Timer switches on pool heaters and pumps are present.
Exceptions:
Where public health standards require continuous pump operation.
Where pumps operate within solar- and /or waste - heat - recovery systems.
❑ Heated swimming pools have a cover on or at the water surface. For pools heated over 90 degrees F (32 degrees C) the cover has a
minimum insulation value of R -12.
Exceptions:
Covers are not required when 60% of the heating energy is from site - recovered energy or solar energy source.
Lighting Requirements:
Lj A minimum of 50 percent of the lamps in permanently installed lighting fixtures can be categorized as one of the following:
(a) Compact fluorescent
(b) T -8 or smaller diameter linear fluorescent
(c) 40 lumens per watt for lamp wattage — 15
(d) 50 lumens per watt for lamp wattage > 15 and — 40
(e) 60 lumens per watt for lamp wattage > 40
Other Requirements:
Fi Snow- and ice - melting systems with energy supplied from the service to a building shall include automatic controls capable of shutting
off the system when a) the pavement temperature is above 50 degrees F, b) no precipitation is falling, and c) the outdoor temperature is
above 40 degrees F (a manual shutoff control is also permitted to satisfy requirement's').
Certificate:
A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R- values; window
U- factors; type and efficiency of space - conditioning and water heating equipment. The certificate does not cover or obstruct the visibility
of the circuit directory label, service disconnect label or other required labels.
NOTES TO FIELD: (Building Department Use Only)
Project Title: KuppingerResidence Report date: 07/05/12
Data filename: Untitled.rck Page 4 of 4
0 2009 IECC Energy
�( Efficiency Certificate
Ceiling / Roof 49.00
Wall 21.00
Floor / Foundation 11.00
Ductwork (unconditioned spaces):
Window 0.29
Door 0.26 NA
Heating System:
Cooling System:
Water Heater:
Name: Date:
Comments:
��a -Days
Ak
TRA -MAGE PRODUCT DATA SHEET
ROOF ACCESSORY SYSTEMS
DESCRIPTION
• Designed for standing seam metal roofs
• Available for all rib types including: ]7
DOUBLE LOCK SINGLE LOCK'L' TEE SEAM ZIP RIB SNAP LOCK
• Accepts 3/4" fence pipe
• Allows for full installation without any penetration of the roof
surface
• Powder coated to match roofing material color
• Overall dimensions: 4 -1/2 "L X 1- 5/16 "W X VAR height
• Height of clamp varies based on rib type and height
MATERIALS
• 3/16" Steel (ASTM A709 Gr 36)
• 1/4" Aluminum
• 3/8" Dia X VAR carriage bolt (2)
COLORS /FINISHES
• Zinc plated steel (ASTM B 633, Type II, SC3)
• Mill finish Aluminum
• Powder coating available in RAL Standard colors
•
Visit www.tra - mage.com to see color chart
NOTE: Due to specific job conditions, TRA -Mage will only warranty a snow
retention system /layout that has been deisgned by TRA -Mage.
r / �
I \r-F
Q
� 1
•. i �+—�- a art e' �•{
�' IL
--- 4 11T -I
These dimensions vary based on the panel rib type and height
BRACKET DIMENSIONS
DO NOT SCALE
TRA -MAGE, inc.
1657 South 580 East
American Fork, UT 84003
C22Z CLAMP -ON
2 PIPE SNOW FENCE SYSTEM
FOR: STANDING SEAM METAL
WRENCH 10 30 FT LB
COLLAR: PREVENTS LATERAL
PIPE MOVEMENT
CLAMP TEETH TO
BE PLACED BELd -"
°ANEL HEM
BRACKET INSTALLATION
DO NOT SCALE
FOR MORE INFORMATION CALL: (800) 606 -8980
VISIT US ON THE WEB: www.tra- mage.com
SB- DUSPN -r"
BIa -oag5
HEPWORTH - PAWLAK GEOTECHNICAL, INC.
5020 County Road 154
Glenwood Springs, Colorado 81601
Phone: 970 -945 -7988
Fax: 970 -945 -8454
E -mail: hmeoAhmeotech.com
PROFESSIONAL SERVICES AGREEMENT
June 26, 2012 Job No. 112 214A
Nova Group
Attn: Dave Irwin
P.O. Box 3342 Phone: (970) 390 -0931
Vail, Colorado 81658
Snapoutofit2Qmsn.com
Project: Excavation Observation, Proposed Residence, Lot 4, Filing 1, Zneiner Subdivision, 1699
Buffeher Creek Road, Vail, Colorado
Professional Services: Hepworth - Pawlak Geotechnical, Inc. (H -P GEOTECH) agrees to perform the
services outlined below. The CLIENT may subsequently amend the scope of services with the
concurrence of H -P GEOTECH. Services provided by H -P GEOTECH will be consistent with the
engineering standards prevailing at the time and in the area that the services are performed; no
warranty, express or implied, is intended. CLIENT is responsible to provide the information known to
be existing regarding the project as it applies to the execution of H -P GEOTECH's services. Please
note the attached Terms and Conditions are a part of this Agreement and contain a limitation of
liability clause.
Scope of Services: Make site visits as requested to observe the soils exposed in the building
excavation and provide an opinion on their suitability for foundation support. You have assumed
spread footings bearing on the natural soils as the foundation type. Subsurface exploration to evaluate
the soils within the loaded depth of the foundation influence is not requested. Variations in the
subsurface conditions not identified could increase the risk of foundation movement and building
distress. Present the findings of the services performed in letter reports.
Additional scope of services will be based on the unit charges and Terms and Conditions of the
attached Fee Schedule.
Fee: Our fee will be based on the unit costs listed on the attached Fee Schedule and other costs needed
to perform our services.
Termination: This Agreement may be terminated by either party upon reasonable written notice. Our
services will be stopped and fees will be calculated to include all services performed and materials
used or ordered.
Acceptance: We are proceeding with the above scope of services based on the verbal authorization by
Dave Irwin on June 26, 2012. Unless notified otherwise, we assume that you accept this Agreement.
Prior to issuing our report, one copy of this Agreement must be signed and returned to us.
HEPWO,TWPAWLAK GEOTECHNICAL, INC.
by
David . Young, E.
/ksw j
CLIENT
Signature
(please print)
& 7 -,- L��
3 Department of Community Development
75 South Frontage Road
TOWN OF VAI! s Vail, CO 81657
Tel: 970 - 479 -2128
www.vailgov.com
Development Review Coordinator
BUILDING PERMIT APPLICATION
(Separate applications are required for alarm & sprinkler)
. ........... ... _..
Project Street Address:
m— &Etellle
(Number) (Street)
(Suite #)
Building /Complex Name:
Contractor Information
Business Name: `Tilt AJ0 U A 6anuQ
Business Address: �D x 3$,4 Z
City LZA t State: Co. zip: A1,6$48
Contact Name: l VAU l Q Td-q) l(l)
Contact Phone: quo - M 0 - 04 61
Contact E -Mail: 5 A1a40j)dT0 F!T 2 6 02614J.
I hereby acknowledge that I have read this application, filled out
in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to
comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according to
the town's zoning and subdivision codes, design review ap-
proved, Intemational Building and Residential Codes and other
ordinances of the Town applicable thereto.
/ I 1/1/JiG X j t
Owner /Owner's Representative Signature (Required)
Applicant Information
Applicant Name: QAJLQ "MJLV* 0
Applicant Phone: Mo - o R 3 I
Applicant E -Mail: SIUAIQoiST n-rtT 2 1$OU. r-na
Project Information
Owner Name: U DiLgfl A) &-A -
Parcel #: 218 :� 1 2 Z l 6004
(For Parcel #, contact Eagle County Assessors Office at (970 - 328 -8640 or visit
www.eaglecounty.us/patie)
For Office Use Only:
Fee Paid:
Received From:
Cash Check #
CC: Visa / MC Last 4 CC # exp date:
Auth #
Project #: &,T
—q (D
DRB #: bp—A 1,
V �) 0 R 6.
Building Permit #: R1
^
a —0 o?lq,5
Lot #: Block #
Subdivision:
i
i Work Class: New (X) Addition ( ) Alteration ( )
i Type of Building:
Single- Family (X ) Duplex (
) Multi - Family ( )
Commercial ( ) Other( )
Work Type: Interior ( )
Exterior ( ) Both (X )
Valuation of
Work Included
Plans Included Work
t Electrical ( X)Yes ( )No
(; <)Yes ( )No 1-7,6 od
Mechanical (x )Yes ( )No
(.---(.)Yes ( )No 20,()06
Plumbing (x )Yes ( )No
(,/-,)Yes ( )No 16,000
Building (x )Yes ( )No
(,-)Yes ( )No
Value of all work being performed: $ 641 -Ina
(value based on IBC Section 109.3 & IRC Section 108.3) 1
Electrical Square Footage
:k 14CL -4
f Detailed Scope and Location of Work: nT EW 5[ NG E
BxGAJA�'IOdTSrYc� GAIUaJ[�' he �4ece>;sec�
iP_C t1Use of e' UZ X Cog yr7"11IOU)
�� Ewa s�'�es w/ �)��oe►Q. ��� �/� ss �
`Foyn1 A�Y'coed . t�oc i s �OoL�' n��Ne
(use additional sheet if necessary) Lr0vNa RT(OA1 UJ Ok- _ -
Y
Date Receilved:
ECIF OWE
rrJU��N 15 2012
^^
Y � �" 5
a
_TOWN OF VAIL 15- Mar -2012
Account
Account: R054468
Location
Parcel Number 2103 - 122 -15 -004
Tax Area SC103 - VAIL (TOWN) -
SC103
Situs Address 001699 BUFFEHR
CREEK RD
Legal Summary Subdivision: ELENI
ZNEIMER SUBDIVISION Lot: 4
R824581 DEC 02 -24 -03
R824582 MAP 02 -24 -03
R861486 DEC 12 -10 -03
R863775 EAS 12 -31 -03
R895609 DEC 10 -26 -04
R200621672 MAP 08 -09 -06
Transfers
Owner Information
Owner Name KUPPINGER, JORDAN
Owner Address 1706 BUFFEHR
CREEK RD
VAIL, CO 81657 -4912
Sale Price Sale Date
500.000 05/25/2012
$1,200.000 05/08/2006
Images
• Photo
• GIS
Page 1 of 1
Assessment History
Actual (2012) $684,000
Primary Taxable $198,360
Tax Area: SC103 Mill Levy: 46.9000
Type Actual Assessed Acres SQFT Units
Land $684,000 $198,360 1.912 0.000 0.000
Reception Number
201210981
200612298
Book Page
http: / /property.eaglecounty.us/ assessor / taxweb /account.jsp ?accountNum= R054468 06/15/2012
10 -09 -2013 Inspection Request Reporting
Requested Inspect Date: Thursdayy,, October 10 2013
Site Address: 1699 BLI EHR CREEK RD VAIL
A/P /D Information
Activity: B12 -0245 Type: COMBO Sub T
Con st Type: Occupancy: YPe: NSFR
Owner: KUPPPINGER, JORDAN Use: R-3
Applicant: DAVID LAWRENCE IRWIN
Phone: 970 - 390 -0931
Contractor: HILL CONSTRUCTION INC Phone: 970- 390 -3413
Description: NEW SINGLE FAMILY RF.RinFwrP AVITG. r%n L. I I _ ___
Comment:
Comment:
Comment:
Comment:
Comment:
Comment:
Comment:
Comment:
Comment:
Comment:
Requested Inspe
Item:
C mm@ or:
Assigned To:
ction s
542 PLAN -FINAL
HILL CONSTRUCTION INC
390 -3413
B IBSON
1,
Status: ISSUED
Insp Area:
INXTWO STAGES WIITH
FOUNDATION WORK AND
F1, and public works. Email sent to building and PW
)N AS NEW CONTRACTOR. RELEASING NOVA
THIS SITE (HP GEOTECH). SCANNED AND
I on DRB approval. Monitored fire alarm and
I. scannea to iaserfiche. and routed toplanner - CGODFREY
ING AND INSPECTION AGREEMENT. SCANNED TRANSMITTAL FORM
JRM FOR APPROVAL. - DRHOADES
"ERWORK CONFIRMING CHANGE IN OWERSHIP AS NOT UPDATED IN
)AY. DAVE IRWIN IS AWARE THIS IS NEEDED. - DRHOADES
& Requested Time: 08:00 AM -0
Ull 1 I 'L Phone: 970 - 390 -3413
Action. Time Exp
CtJ' �a Entered By: JMONDRAGON K
�ou 4 Gas Me
Inspection History I G f r W er
Item: 10 BLDG - FOOTING "Approved "
09/27/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: garage slab
10/17/12 inspector: sgremmer Action: AP APPROVED
Comment: upper
Item: 20 BLDG - Foundation /Steel " Approved **
Comment ASPNOTED ON PLANS Action: PA PARTIAL APPROVAL
10/29/12 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 120 ELEC -Rough
h '• Approved
10/09/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: SeMce
Com /m6ent NotcEtp�ate feedemunder panel Action: DN DENIED
06/10/13 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 210 PLMB - Underground "Approved'"
09/21/12 inspector: mdenney Action: AP APPROVED
Comment:
11 Inspector: Martin
Comment: meat: Action: PI PARTIAL INSPECTION
upper level only
06/05/13 Inspector: sgremmer Action: AP APPROVED
Comment:
Item: 200 MECH -Rough "' Approved "
09/27/12" Inspector: sgremmer Action: PI PARTIAL INSPECTION
Comment: insflpoor heat at rage slab
Comment UPPER LEVEL N FLOOR HEAT 1Action: 0 IR PI PARTIAL INSPECTION
06/05/13 Inspector: sgremmer Action: AP APPROVED
Item: 220 PLMB Rough /D.W.V. "Approved *'
REPT131
Run Id: 14715
,�,
��
.�� ,` � � � �
, �
12-03-2013 Inspection Request Re orting Page 1
4:05 �m Vail, n it� p�
Requested Inspect Date: Wednesday,December 04 2013
Site Address: 1699 BUFFEHR CREEK R�VAIL
A/P/D Information
Activity: B12-0245 Type: COMBO Sub Type: NSFR Status: ISSUED
Const Type: Occupancy: Use: R-3 Insp Area:
Owner: KUPPPINGER,JORDAN
Contractor: HILL CONSTRUCTION INC Phone: 970-390-3413
Description: NEW SINGLE FAMILY RESIDENCE. NOTE: OPEN HOLE SOILS REPORT AT EXCAVATION. SITE
UPPER B ENCH FIRST AND FOUNDA�T ONRSOILSIRE ORT DONE BEFORE O NDAT ON WORK AND
CHECKED BY ENGINEER.
Reauested Inspection(s)
kem: 542 PLAN-FINAL � ` Requested Time: 08:15 AM
Requestor: HILL CONSTRUCTION INC Phone: 970-390-3413
Comments: 390-3413 � 12�(� _�.�
Assigned To: ��iE Entered By: JMONDRAGON K
Acti�n: l�{{,, Time Exp:
Commen. ain gas me er and wk�it�pvc pipe un er e ec rical meter. Installed approved full cut-off light fixtures per
_ approved ptla+�:- _ _
GpNc1 : �AiN—f' �✓82N PvG �'�'a' ,r n�af�r (d�►-� b�a�N1►�).
Item: 190 ELEC-Final Requested Time: 09:00 AM
Requestor: HILL CONSTRUCTION INC Phone: 970-390-3413
Comments: 390-3413
Assigned To: JMONDRAGON Entered By: JMONDRAGON K
Action: Time Exp:
Item: 290 PLMB-Final Requested Time: 09:30 AM
Requestor: HILL CONSTRUCTION INC Phone: 970-390-3413
Comments: 390-3413
Assigned To: JMONDRAGON Entered By: JMONDRAGON K
Action: Time Exp:
Comment:
Item: 390 MECH-Final Requested Time: 10:00 AM
Requestor: HILL CONSTRUCTION INC Phone: 970-390-3413
Comments: 390-3413
Assigned To: JMONDRAGON Entered By; JMONDRAGON K
Action: Time Exp:
Item: 540 BLDG-Final C/O Requested Time: 10:30 AM
Requestor: HILL CONSTRUCTION INC Phone: 970-390-3413
Comments: 390-3413
Assigned To: JMONDRAGON Entered By: JMONDRAGON K
Action: Time Exp:
Item: 420 S�pecial Inspect-final rept Requested Time: 11:45 AM
Requestor: HILL GONSTRUCTION INC Phone: 970-390-3413
Comments: 390-3413
Assigned To: SGREMMER Entered By: JMONDRAGON K
Action: Time Exp:
REPT131 Run Id: 14720