HomeMy WebLinkAboutDRB120193 Excel Utility Sign OffUTILITY APPROVAL & VERIFICATZON This form serves to verity that the proposed inrprovements wiII not impact any existing pr proposed utility services, and also to verify service evailabili y and oca ion for new construction and should be used in conjunction with p~’eparing your utility plan an,d schedul-ing installations A site plan, including grading plan, floor plan, and elevations shall be subnritted to the following utilities for approval and verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES Ifyou are unable to obtain comments within that timefranle please contact The Town of Vail.Vall Village ist Sabject Property Address: 16 Vail Road / 100 E Meadow Dr. Lot O & M Block 5D Subdivision:Primao/Contact/.Owner Representative: Lod Mowder, CHC Phone: (970) 328-30,10 --(~,,~..~ I~Plans Dated: May 1,2012 Prb’nar~ Contact/Owner Representative Signature Th~=~ in’o]e{ t is between ti~ese two add~-esso~i CENTURY TEL 970,468.6860(tei)970A68.0672(fax)Contacts: Samuel Tooley XCEL HIGH PRESSURE GAS 970.262.4076 (tel)970.468.!40! (fax)Contact’. Rich Sisneros dchard,sisneros@xcelener qy.com HOLY CROSS ENERGY 970.947,547! (tel)970,945,4081 (fax)Contact: Jeff Vroom vroom@holycross.com XCEL Energy 970,262,4038 (fax)970.262,4050 (tel)Contacts: Louise ]imson louise.tim~oa@;~ce~ruy.c rmr EAGLE RIVER WATER & SANITA-TION DISTRICI"970.477.5’~35 (tel)970.477.5434 (fax)Contact: Tug Birk COHCAST CABLE 970.930A713 (tel)970.468,2672 (fax)Contact: Michael 3ohnson Michael~olrnson @cable.co recast ,corn CDOT (Only In CDOT Right-of-way)970.683.6284 (tel)Contact: Dan Roussln DanieLroussin@doLstate,co.us NOTES:1. Utility locations must be obtained before digging.2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way, Contact the Public Works Department for verification 970.479,2198.3.It is the responsibility of the utility company and the applicant to resol~ problems Identified above.4, The Primary Contact/Owner Representative is required to submit any revised drawings to U~e above agencies for re-approval & re-verification If the submitted plans are altered In any way after the authorized signature date.