HomeMy WebLinkAboutB12-0040 Vail Public Library Impairment Plan approved PO Box 1073, Frisco, CO 80443 970.409.9082; fax 970.797.1898 May 7, 2012 Mike Vaughan, Fire Marshal Vail Fire & Emergency Services Vail, Colorado Re : Vail Public Library , Impairment Letter Dear Mr. Vaughan, This letter will serve as an impairment notice for the work being completed at the Vail Public Library . The scope of work i ncludes an interior remodel, lower level build ing addition, elevator addition, fire alarm system replacement and upgrade/extension of the fire pro tection system . Evans Chaffee is the General Contractor on the project. P hasing : Please see the Partial Occupancy Plan and Life Safety Plan for the Phasing of the project. Phase 1 is scheduled to open on July 3, 2012 and includes the Stacks area, Restrooms and Main Entry. Phase 2 is scheduled to open at the end of August and includ es the Meeting Room area and Lower Level. Egress : An egress plan is included as part of the Partial Occupancy Plan. Access: Fire Department a ccess to the building will not be changed during construction. Fire Alarm: The fire alarm system will be offline during construction. A full replacement of the system is being performed by Vail Electronics . B y July 3 rd , the fire alarm panel will be functional and all areas to be occupied will have full coverage smoke/heat detection and occupancy notification. Fire Protection: The existing building is partially spri nklered. As part of this scope, the existing fire protection system is being extended to provide full NFPA 13 coverage throughout the building. By July 3 rd , the fire protection system will be fully functional in all areas to be occupied. Please review the attached p lan s and let me know if you have any questions about the impairment of this site during cons truction. Sincerely, Deborah L. Shaner, P.E. Fire Protection Engineer Cc: Pamela Hopkins, Snowdon Hopkins Received By Lynne Campbell at 8:27 am, Jun 13, 2012 B12-0040 Reviewed for Code Compliance Code: 2009 International Building Code (IBC) By m at 2:59 pm, Jun 22, 2012 Received By Lynne Campbell at 8:28 am, Jun 13, 2012 B12-0040 Reviewed for Code Compliance Code: 2009 International Building Code (IBC) By m at 2:59 pm, Jun 22, 2012 POP 1 Date Job Number VAIL PUBLIC LIBRARY REMODEL 292 WEST MEADOW DRIVE P.O. BOX 3340 Vail, Colorado 81658 970-476-2201 FAX 476-7491 1118 5-31-12 VAIL, COLORADO COPYRIGHT - ALL RIGHTS RESERVED.THIS DESIGN, INCLUDING ALL DRAWINGS, HAS BEEN PREPARED FOR THE SPECIFIC CLIENT AND SITE AND AS SUCH ARE THE INSTRUMENTS OF PROFESSIONALLY CONTRACTED SERVICES FOR USE SOLELY WITH RESPECT TO THIS PROJECT.THIS DESIGN REMAINS THE INTELLECTUAL PROPERTY OF THE ARCHITECT:SNOWDON AND HOPKINS, ARCHITECTS, P.C.ANY REPRODUCTION OR USE OF THESE DRAWINGS FOR DISTRIBUTION, INCLUSION,EVALUATION OR CONSTRUCTION REGARDING ANY OTHER SITE, OR DESIGN, IS STRICTLY PROHIBITED WITHOUT PRIOR AND EXPRESSED WRITTEN CONSENT AND PERMISSION OF THE ARCHITECT.INASMUCH AS THE REMODELING AND/OR REHABILITATION OF THE EXISTING STRUCTURE REQUIRES THAT CERTAIN ASSUMPTIONS BE MADE BY THE ARCHITECT REGARDING EXISTING CONDITIONS, AND BECAUSE SOME OF THESE ASSUMPTIONS MAY NOT BE VERIFIABLE WITHOUT THE OWNER'S EXPENDING SUBSTANTIAL SUMS OF MONEY OR DESTROYING OTHERWISE ADEQUATE OR SERVICEABLE PORTIONS OF THE STRUCTURE, THE OWNER AGREES, TO THE FULLEST EXTENT PERMITTED BY LAW, TO INDEMNIFY AND HOLD HARMLESS THE ARCHITECT, ITS OFFICERS, DIRECTORS, OWNERS,EMPLOYEES, SUB-CONSULTANTS, SUCCESSORS AND ASSIGNS FROM AND AGAINST ANY AND ALL CLAIMS, DEMANDS, LOSSES,CAUSES OF ACTION, DAMAGES, LIABILITIES OR COSTS, INCLUDING REASONABLE ATTORNEYS' FEES AND DEFENSE COSTS, WHICH ANY OF THE FOREGOING PARTIES MAY INCUR ARISING OUT OF OR IN ANY WAY CONNECTED WITH THIS PROJECT, EXCEPTING ONLY THOSE DAMAGES, LIABILITIES OR COSTS ATTRIBUTABLE SOLELY TO THE RECKLESSNESS OR WILLFUL MISCONDUCT BY THE ARCHITECT .LOT 5, A RESUBDIVISION OF LOT 1, BLOCK 1,VAIL / LIONSHEAD SECOND FILING Received By Lynne Campbell at 8:29 am, Jun 13, 2012 B12-0040 Reviewed for Code Compliance Code: 2009 International Building Code (IBC) By m at 2:59 pm, Jun 22, 2012 Reviewed for Code Compliance Code: 2009 International Building Code (IBC) MH 4/13/12 STAGING & STORAGE WITHIN FENCING CONSTRUCTION FENCING. (6' Green Screen Panels)DUMPSTER ACCESSED VIA BIKE PATH DELIVERIES BEFORE 10am CONSTRUCTION BARRIER w/ DOOR VAIL PUBLIC LIBRARY STAGING, DELIVERY & ACCESS PLAN 6/12/12 Received By Lynne Campbell at 8:29 am, Jun 13, 2012 B12-0040 Reviewed for Code Compliance Code: 2009 International Building Code (IBC) By m at 2:59 pm, Jun 22, 2012