Loading...
HomeMy WebLinkAboutB12-0261 NOTE: TH/S PERM/T MUST BE POSTED ON JOBSITE AT ALL TIMES ,. TOWN OF VAII, ' Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 COMBINATION BLDG PERMIT Permit #: B12-0261 Project #: PRJ12-0325 Job Address: 1575 ASPEN RIDGE RD VAIL Applied.....: 06/26/2012 Location......: Issued. . . : 08/27/2012 Parcei No....: 210312202014 OWNER KRUSZEWSKI, RONALD & SHARON 06/26/2012 2724 TURNBERRY PARK LANE ST. LOUIS MO 63131 APPLICANT CONTRACT ONE, INC 06/26/2012 Phone: 970-748-1138 PO BOX 8530 AVON CO 81620 License: C000003119 CONTRACTOR CONTRACT ONE, INC 06/26/2012 Phone: 970-748-1138 PO BOX 8530 AVON CO 81620 License: C000003119 Description: ADDITION OF A SITTING ROOM AND 3 BEDROOM ADDITION TO EXISTING HOME. ' Occupancy: R-3 Type Construction: VB Valuation: $207,690.00 ................................................................................. FEE SUMMARY .,,,..,..,.,...�..,.............,...,.,.,......,.....,...,..,...,,.,,,,_...,,,_ Building Permit----------> $1,598.55 Bldg Plan Check----------> $1,039.06 Use Tax Fee-----------------------> $3,953.80 I Electrical Permit-------> $230.00 Elec Plan Check-----------> $149.50 Restuarant Plan Review--------> $0.00 ', Mechanical Permit------> $40.00 Mech Plan Check---------> $10.00 Additional Fees--------------------> $0.00 ' Plumbing Permit--------> $150.00 Plmb Plan Check---------> $37.50 Recreation Fee--------------------> $90.00 Investigation-----------------------> $0.00 Will Call------------------------------> $20.00 TOTAL PERMIT FEES--------------> 57,318.41 Payments-------------------------------> 57,318.41 BALANCE DUE----------------------> $0.00 ....................................................,..............................,,......,....,....,......,.....,...,....,.........,..,..,......,.,,..........,..........,.....,,..,,. DECLARATIONS I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM -4:00 PM. combination permit_012811 l . # � T�1�N aF�AJL i ........................................................................................................�.,..,,,......,....,....,.....,�.........,,....,...,.......,.....,,,,.,,,.... CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF Permit#: B12-0261 Address: 1575 ASPEN RIDGE RD VAIL Owner: KRUSZEWSKI, RONALD & SHARON Location: Yf#f4#i`#f4if4#iI#+4i(f4f4ti444t�+4f4l4f+4�t**f1rRRR+R*iR*il'ftrYYrMfY'trrtYe�k�MRYf49'tw�A'rtf.####tt44A'�k##f 44444Ii#444f}fffxk4rtiR4iR}eYrYefrtrtYeY(rtiF4+4+ii(4f�444+fiftif�i4+'RbftertYtrrtiPYek#'#�k#11(f(i#4irl�lifi�4f1rtri4fit Cond: 42 (BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315 III I I combination permit_012811 . � TOWN OF VAI� ` **�**..************...*..****#**�******�.*.***�*�*.*********,***.*,*,��*****..***�.*��*******.**********************,****�***�..#.�*****.**********...** REQUIRED INSPECTIONS AND STATUSES Permit#: 612-0261 Address: 1575 ASPEN RIDGE RD VAIL Owner: KRUSZEWSKI, RONALD & SHARON Location: .**.**,.******.******.**,.**.******,.**.*****��**,,,*„*«��,,,,«�«««.,«««««**«*.,.,«,.,,*,.�.,*.,*.**,.,.*�**.,.****,..�**�***„*...,,,,,,.*..*.,.**«*..*#********,.******«,.,,,,,,,,,, Item: 00010 BLDG-FOOTING Item: 00020 BLDG-Foundation/Steel Item: 00210 PLMB-Underground Item: 00220 PLMB-Rough/D.W.V. Item: 00230 PLMB-Rough/Water Item: 00240 PLMB-Gas Piping Item: 00200 MECH-Rough Item: 00410 Special Inspect-progress rept Item: 00030 BLDG-Framing Item: 00050 BLDG-Insulation Item: 00060 BLDG-Sheetrock Nail �', Item: 00390 MECH-Final I Item: 00290 PLMB-Final ' Item: 00190 ELEGFinal Item: 00420 Special Inspect-final rept � Item: 00090 BLDG-Final I combination permit_012811 =�' ',,,� Department of Community Development f 75 South Frontage Road TOWN OF UA1L � va�i, co a�ss7 Tei: 970-479-2128 www.vailgov.com Development Review Coordinator TRANSMITTAL FORM Revision Submittals: 1. "Field SeY' of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved &the permit is re-issued. 3. Fees for reviewing revisions are$55.00 per hour(2 hour minimum), and are due upon issuance. Permit#(s)information applies to: Attention: ( ) Revisions � �j.Response to Correction Letter attached copy of correction tetter � ( ) Deferred Submittal � — �, ( ) Other Project Street Address: -• /s7J1 n , � (Number) (Street) (Suite#) � ' Description/List of Changes: Building/Complex Name�_��%�'►'� <'/��/�� Contractor Information �� � Business Name: �1�C./1�+� �jl/"/f/�p,Q�9'�.t� .�t0� Business Address: / � �r� U r�C) �� S '� (����ili�L City ��� State: K� Zip: ��b �U —�—_._. Contact Name: C� (use addition I sheet if necessa Contact Phone: 1 � � � ,(j "_�� � � �� _. _ ,�:.._. ,.... . ..�_._� . .. _. ,,_. . � .... ......... __ _ ,/'� �) ' Revised ADDITIONAL Valuations (Labor& Materials) Contact E-M ': !��yGC ti (S✓ �Oh7��"�C ��1"C (DO NOT include original valuation) � f'PS X Building: $ Own r ner's Representative Signature(Required) Plumbing: $ Applicant Information Electrical: $ Applicant Name: Mechanical: $ Applicant Phone: Total: $ Applicant E-Mail: For Office Use Only: Date Received: Fee Paid: �!�� � �!� �� Received From: � 7 Cash Check # �, � �( A�� 15 2012 �� CC: Visa / MC Last 4 CC # exp. date: '��j`� � � Auth # vA�� TOWN �F ; o�-o�c-i i Bryan Johnson From: JR Mondragon <JMondragon@vailgov.com> Sent: Monday, July 02, 2012 329 PM To: Bryan Johnson Subject: corrections required for 1575 Aspen Ridge Good afternoon Bryan: The following items need to be resubmitted on 3 new sets of plans, �I The items missing are: Electrical load calcs . � Mechanical plans� _��..�_. Plumbing plans_ � � __ Window schedule Res-check or how project conforms to IECC (energy conservation) Stucco detail Wall details Stair rise and run hand rail or guard rail details Special inspection agreement CO and smoke detector placement Thank you. Florencio Mondragon Jr Senior Building Inspector/Plans Examiner Community Development TOWN OF VAII � 970.479.2143 970.376.2673 vailgov.com twitter.com/vailgov � � .----� '. __.__.._�—_.__ ,___..'... __...�� Joa Nan�e .__ ____.__ I ' A� Jc:�t�ddce�s �'Z,rj f)SP�J�'._�L��u j , T0�:�01'Y.�IIj�` � ��-m;t�� �1�-�2[01 _ ' -- ____ _ ..__._----_ _ � SPECIAL INSF'EC?IQN AND TESTtNG AGREEMEN7 {'fo apglicants of project5 requicing Special Inspection or Testing psr Section'f7G1 of tf�e 18C} The orrner o� histher repsesen;ative, or.the ac�vice o1 the desi� �sofes5icana! in responsibE� charg�.s.nail complate. se�, s�gn ar� submit a copy oF �e SNe�ia€ I�s�ection Ayreement ar.d St��ctura{ Tests Sched:;ted to the To+.vn ts� V2ii fcr revietiv anti ap�rovai. Sig�atures ars requised on �oth �ages; pnotocopied or faxed signatures are�rreotab.e. T�s orvner and his:her g�naral cor;�a��tor, ahera a�iplicubla, shal' als� a��knr�wledre t�,e f�tla�ving conci:ons appiicab��tc Special tnsaect�cn Testir,g. 9. Ccntractor is resporasiblp fer proper nutification t� the lnspectian ar Testiny agercy fc° i:ems fisted.(Page ij (�BC t704) 2. On�}�tt�w testirg labora:ory shcuid±akz sampies and trars;aF�#hem t�theu�abora;or�. 3 CcpiES of ail?aboratory repor.s ar,3 irspectionc a�e tc be ser.t directN ta the Tewr, c�faii by;he Testing �gercy on a weekiy bas s. � R^s�ecfior agency to s:�brnit nar,ses and quat.'ficat�ens o!ar-site speciat "rr.s�aclo�s tn the 7�4vn oF Va�: far r�viQw and appro��a.;Page 2} 5 Tne sp�^a�i :nspectar is resacnsible to im��ed:ateiy notify tt�e T�vn of Vat Buiiding Otf�c�ai in�vritsno ct any cor�cems an�Far problen^s encountare�. 6 it is :he responsib�lity af ;he can�a:.tar `.o rsview tFe "awn of V��� appcoved plans far addi;�or+a� inspec:ion�r tes4ng re�uirements that may be nated. A pre•construct:en confer_w�e at the toh ss'e is r�co�rmer.d�to review spec:ai ir.saection�r.xedures 7. Th�speci�l inspecto•shail use anly U^E To�vr.o�Vaii a�pr;,ved dra�+ings. $. Ail specia! inB�cEic� Fteid re�orts m:ist be leti o^ site P�r rev�e�r by tk�e Tcuvr+ o# ti`�iI sWfE pr;� ie requited rc�spechons or re-insp�:tie�s. BEFORE t�GCIiPA�iCY ti^d Lt, 8E GW�NTEO. The speci�l inspsct+on agercy sf��i; su�mit a s�gne� an; sea�e�sia±eneRk t�st a'I;tems requir;ng test:ng ana tnspectio^ w�re fu�filled and r�orted. '"fi�s2�tems nci tested�ndr'�r rns�e�ted shall be naEed ir this statement. A cop�cf tie sta#emenf sha`sl b�!^�a�tained ai i�e i�b sit?i�r,^e 3u=i�:nc�nsp�ctv�'s revie�.v pr=or;o finaE insp�::,on. Rckno��tedcamen' ' �-/:e�sz�.��� � �� � � ^ � � fJti,�ne�: ---._.._ ��r� _________ __._ � S �ute �r±r t t�l�an�e :;a'.e �jC?rCIsZ11i15c:e. % f�� �� .-.------- � R.��}2r.vy:T ` ��_1 '' � ----- . . I1_If���y:`��/� �'n f�^ •._. Cr��f-vs,� �rr'�;3frn .:at° 7r ' � wse�t y� -:��._ . ,g_ ��{(�t/ � � .�;. � g'f�`/'Z - -�—-�_v.�--___ ���r��r,g: ----- -----________,_. � �a 2tL€re - r•:irt Narrta a{� f,� .:Cr.t'aC:�� _ _.. _.._A.� _ �� ���L� ` S�qii;�', =F>�':,^`.i3t?'B , � »�.. r�_ . ._..., _,. ... _,__�.... ....._..�.... ,..... .-_.., _._..._.. �. >a_ ,,.��c.... �� -� Job Name:���_ �� �� 7� ����Y� � .lob AddreSS: � P��,:�rva.: ,Q/1 - d 6�% SPECIAL INSPECTION AND TESTfNG AGREEMENT (7o applicants of projects requiring Special lnspection or Testing per Section i701 of the IBC) The o�Nner o� hislher representative, on the advice of the design professional in responsib€e charge, sf�all complete, seal, sign and submit a copy of ;he Spe�ial Inspedion Agreemeni and Structural Tests Scheduied to the To�vn of Vail fcr review and approval. Signatures are required on both pages; photocopied or raxed signatures are acceotable. The owne� and hisfher general con:ractor, where app[icable, shall also acknowfedge the foElowing condi,ons applicable to Special(nspectian Testing: 1. Contractor is responslble for proper noti�ication to the lnspection or Testing agency fo� items fisied.(Page 1} (�BC 17{Y4) 2. On1y the testing laboratory should take samples and transport them to their laboratory. 3. Copies of all labaratory reports and inspeciions are to be sent directly to the Town of Vail by:he Testi�g agency on a weekly bas s. 4. Ins�ecGon agency to s;�bmit names and qualifications of an-site specia! inspecio�s to the Totvn oF Vail for review and approva.{ Page 2) 5. The special inspector is respcnsibls to immediately noiify [he Town of Vail Building Official in writing oi anyconcems and/or problerns encour.Eerad. 6. It is :he responsibility �f the confractor ;a review the Town of Vai� approved plans f�r addiiionaf inspection or testing re�uirements that may be noted. A pre-construction conference at the job si;e is recommended to review special inspection procedures 7. The special inspector shall use only the Town of Vail apprcved dravoings. 8. All specia! ins�ecEion field rePorts must be left on site Por revie�v by the Town of Vai1 staff prior to required inspections or re-inspections. BEFORE dCCUPANCY W:LL 8E GRANTED: The special inspection agency shalf subrnit a sEgned and seafed statement tnat aEl items requiring testing and inspectior were fuffilled and reported. Those items not tested andivr inspected shall be noted in this statement. A copy cf the statement shall be maintained at the job site for t7e 8uilding Inspector's review prior ;o final inspection. Acknavd{edr,.emeni'. O��m e�: n�u€e Prinf Name Gate /r ._ Speciallnsp i - - � _� Agency � �/ '�.c._ ��.i1Z1 S7GtlfGJ,f�'at./� 7" % _ `�' Signalure Print Name Gate ��ojecl A�ch/E r g: Signature Print Name Cate CGf1t�3Ct�f: � Z � Signa? Prir ame D e -3- TI_:_ t_....'__ ���:�..��IL../�_'_i___�11.__ 1._� r_..('�__'__/l-lrl-lAtl .lA�ll11_.. 4 1 � 1uWN�FYAII+ � SPECIAL ENSPECTION AND TESTING SCHEDULE � (IBC 9704) Project Name: ' � Permit# Owner's Nam : �, v Test�ng Ins ti i _ i �iufe� ' " � Prirt Name �ate Agency _ _� � `,r ' ' / t11 Testin Ins L=k �� � '� �}1 t.-.'��•p�.,� 9 pection Signahtra Pn�Namey��+�� Date Heretry certifies that the Teslingllnspecfian Agency ramed above has been engaged to perform structural tests and inspeCtior.s during cons`ruction as chedced below, to satisfy all applicable po�tions of the Building Gode. Prior to fma! inspeGion, the Inspeciion Agency shafl subm9t a statemeni that all items of designated work perforrned tvere reported. Any items checked but not tesied or inspected will be noted and explained Whenever any designated items on the list are ready for sampling, tesGng, or inspection, it shail be the responsibility of the contractor to give Eimely notice to the Insaectian agency so that the required services may be perforrned. REIMFORCING STEEL: UN�ERPINNING: Tensikk&Bend,one set per heat pe� tons Temporary/Permanant lnspection of Plac�nen! 3nspection of Steel Fabrication inspection of Welding lnspection oF Reinforcing$�Forms �, Epoxy lnspedion oF Concrete Placement Inspection of Tiebacks MASONRY: Prelim.Acoeptance Tests(Masonry Uniks,Waif Pris:�!�s) SOIL�tAILS: '' Subsequent Tesfs(Mortar,Grou� Field V4laff Prisms) Tamporary Shori�g ' lnspec;f�n of P,acementand Crouting Pemianent WaEf CONCRETE,SHOTCRETE,GROU?AND 1AORTAR STRIlCTURAL STEEL: Concrete Shot Gra,t Mortar Sample&Test(List speGfic members bebw} Aggregale tests for design Shop Idertfffication 8 VUeld'mg Enspe�tion su�tab�rty ofaggregates Shop Ultrasonic Inspection !nix oesigns Shop Radiography iest Panei �L/ Fieki Welding Inspection 9atch Plant lnspeaion —,;�F���Iting Inspecxion �emeM Grab Samp� Fie�d URrasonic Inspeciion nspect Piacing Field Radio�raphy CompressiCn Tests AAetal Deck�Neld ng Inspection Cast Specimens FIREPROOFING: Pick-up Samples inspedion&PJacement Shrinkage Bars Yie�d Che:k SOILS: Air Cneck Acceptance Tests Dry Unit'rle�aht Moisture-Density Determination PRECAST CONCRETE: Field Density Reinforc rtg Tests Drilled Piers Inspection of Rairsfarcing P{acemert Deep Foundation Tendon Tests InspecUOn of Tendon P!acement STRUCTURAL WOOD- Inspect�on of Concrete PEacement InsFecfion oi Fabrication ' Inspec'ian of Concrete Batching Inspection of Truss Joint Fabrication Inspec-ien of Panel Attachment&Inserts Sample&Tes,Components Corr�rossion Tests Irspectian ai G[u _am Fa�r�caiion fns�ec;ion of Stressingll"ransfer PILING,CAlSS4NS,CAPS,TIES: SMOKE CQNTROL: Inspection of Reinforcing�facement SPECI0.L CASES: Inspadion of Concrete Placement Inspeclion of Cencrete Batching SPECIAL INSPEC;ION: 5eismic Resistan:,z 5F�'�Y othe�tests,inspections cr speaa;ins;ructrons requi�d. V'Ji,d Requifemet�ts -4- ri_:_c_.....__ "':_..__ii_..r+_".'_'.�.__ i__ r_..n__"'n�n�enw��nc_._ � ... ��totT�r:��� sTaT�s ��.o� F�ont�c�ss �I'������ .��� �u-�0 E:aST-�iST .a�E���E DEN�'ER,CO 80?16 '''.�f;ki._�ct::r:=:r :�������i_z. w � N a o w s ; o 0 o R s pn��„� �o;_�-,-��h�; QCOTE - T000900 Fa� ���=-=,�--1���- Standard Report Job\ame: .��pen Rid�_e addition Ship To .address: BidFor: (6usiness,��dress� Cash Sale Clobal Optiont (For ali ��indo�',s unle»odterttii�e;pecifi�d) P(�E i CLAD U\(T ' H.�RTFORD Gti '�, ti.AT[;RAL ('vT ' �:��1B=6 4'16 ', iA�1B EXT\ .�PPLIED ' �l'TS= Cll_^_0_!0 CONFIG=010411-A Each Tota( Line i Qty 2 CONE'IGURED ti�IT RO= W=24 1;? H=24 L'3 AC2424-1 1 j EAST ELEVAT[ON FRA�tE= Vd=24 H=24 AWNIVG WItiDOW' AC2424 ', P I i � U-value= .3.i � Shgc= .19 � BU= W=24 � H=24 � OPER?�TI VE i W?BREATHERTUBE � LOE-366 � DUAL GLS � CHEST;vUT BRZ SCR'`' � FBG � N1ESH � STD HDWR j CHESTNUT BRZ HDW'R i � � -- --� �---N Line 3 Qry 1 CONFIGURED UNIT RO=�'�'=72 I!2 H=60 1/2 CC3660-2 � SOUTH ELEVATION FRA'�-tE=W=72 H=60 CASEMENT WINDOW CC3660 � P i I � Dp Rating=DP R.4TING=�0 ; U-value=.33 I Shgc= 20 ( BU= , - W=36 � H=60 � H:LEFT � W!BREATHERTt;BE j LOE-366 � DUAL GLS i , ��� CHESTNUT BRZ SCRN � FBG ti1ESH � ADJ HINGES � STD LOCKS � CHESTNUT � I � j BRZ HDVVR � NO BRKh1LD s K' � �� CASEAIENT WINDOW ��. i; ,j i CC3660 j P 12 j Dp Rating=DP RATING=�0 � U_value=33 , Shgc= .20 � BU= �; � Vb'=36 � H=60 � H:RGHT j W/BREATHERTUBE � LOE-366 ( DUAL GLS � - CHEST;�IUT BRZ SCRIv � FBG MESH I .4DJ HINGES I STD LOCKS ( CHESTNUT ._�c r �a--r . BRZ HDWR I I�O BRKMLD Line 6 Qty l CONFIGURED UN[T RO=W=5'7i8 H=48 1/2 CC2848-2 � WEST ELEVATION FRAME=W=57 3!8 H=48 CASE:�IENT W[NDOW CC2848 � Pl 1 � Dp Rating=DP R.AT[tiG=50 � U-value=.33 j Shgc=.20 j BU= W=28 1 li 16 � H=48 � H:LEFT � WiBREAT'HERTUBE i LOE-366 � DUAL G(.S � ' � �� � CHESTNUT BRZ SCR;�J � FBG I�tESH � ADJ H[NGES ! STD LOCKS j CHEST�iUT ; BRZ HDWR j NO BRKViLD '�� C.aSE�tENT W't�DOW : � ,; � � � i� CC2848 � P 13 ; Dp Rating=DP R�.TWG=�0 i U-value= .33 ; Shgc= ?0 j BU= i �__� I �JV=38 I l;16 ' H=48 ; H:RGHT ( V�'BREATHERTUBE � LOE-366 ! DU,aL GLS i • ---- � CHES?NUT BRZ SCR� ', FBG�1ESH ! ADJ H[NGES I STD LOCKS � CHESTNUT .—�:��—:��—Y ''" BRZ HDV�R \O BRK'�1LD E3i�1 I3�:Con•Dro>t �'er:6.O=.UU6� Page 1 uP-i [3id Dat�d: ':�-3012 i 1'IOC\T�I\ STaTES BL�G PRODUCTS Q�,�OTE - QT000900 Bid For Job�ame Casn Sale ���+en RidQe addit;on Each Total Line 9 Qty l CO\F1GLR£D l\1T RO= 1�'=?-1 L? H=�3 1"? CC��-38-1 ��EST ELE�'.aTlO\ FR.��1E _ ��_?-1 H—�3 C.�SE�IE\T�i t\DOV1' CC3=1-�8 ' Pl 1 Dp Ratin�= DP R4T'I\G = �0 l.-value° .3� Shtrc= .�0 ' Bl = - w'=?4 � H==�3 H:LcFT \�%BREATHERTI.BE ' LOE-366 : DU:AL GLS ,—�I CHESTNUT BRZ SCRti ' FSG '�IESH ; .�DJ HItiGES STD LOCKS CHEST\LT BRZ HDWR '�O BRK\1LD .. i: ', .. i � ; Line 11 Qty 1 C0IFIGURED C11T RO= V�'='_4 1'2 H=�8 1'2 CC?d48-1 '�, W'EST EI.EVATIOti FRA'v1E= W=24 H=48 CASE�IENT WINDOW CC2448 � Pl I ; Dp Rating=DP RATI'�1G=�0 ' U-value° .33 ; Shgc= ?0 ', BU= Vb'=24 'I H=48 H:LEFT I W/BREATHERTL'BE i LOE-366 � DUAL GLS � - � CHESTNtJT BRZ SCRN � FBG vIESH ADJ HI',�GES ; STD LOCKS i CHEST�UT I; BRZ HDWR ?�O BRKMLD I��i � I _ �— Line L3 Qty 1 CONFIGCRED U1IT RO=W=34 1!3 H=48 1!3 CC3448-I W'EST ELEVATIO� FRAME= W=24 H=48 CASEME'.�T W'['.�iDOW CC2448 i, P 1 1 Dp Rating= DP FtATING=50 lJ-value=33 Shgc= ?0 I, BC;_ T �—. W=24 � H=�3 '� H:LEFT '� W'!BREATHERT�BE I LOE-366 DL'AL GLS � CHESTN[;T BRZ SCR_'�l � FBG MESH ADJ H['�IGES STD LOCKS '� CHEST�IUT 'I� � BRZ HDW'R ! VO BRKMLD , , I � i�� � ��� . � Line 1� Qty 1 CO'�FIGURED UNIT RO= w"=;6 1/3 H=37 3116 CC3636-1 ! �LEST ELEVATIO\ FRAV1E= W=36 H=36 1 li 16 CASE�'IE1T W"1\DOW CC3636 PI 1 ' Dp Rating=DP RATI'�G=�0 U-value— .33 Sh�c= .30 BL= w'=36 H=36 1 1 15 H:LEFT I W�'BREATHERTL`BE LOE-366 I DC;:4L GLS j � '��� CHESTNI;`T BRZ SCRV� ��, FBG v1ESH ADJ HI�iGES CHEST\UT BRZ HDWR ; II� ' \O BRK�tLD r il' I . �. _ � �i ,� . . – - - --- Bid I3'�:lun Dro;, b':r:6.O?.UUb� P::_�_'o;� 3i�i Datz�: -� '_!�1' 110L��1T.-�I\ STATES BLDG PRODL!CTS QI:OTE - QT000900 B�d Foc Job V�ame Cash Sale �spen Rid�e��eitivn Each Total Lirte 1% Qty 1 CO.\FIGtRED C.\1i R0= ��'_=6 1 ? H=�-: 16 CC�636-1 , \k'EST ELE�.aTlO\ FRa�IE _ �'�_�6 H=�6 I 1i16 C.aSE'�iE'�T V111DOV1 CC3636 I PI 1 ; Dp RatinQ= DP R.aT1�G=�0 i li-value= .33 Shoc= .30 B[, _ \�=35 ' H=36 1 1-16 H:RGHT V�'BREATHER?UBE LOE-�66 I DI.AL GLS CHEST\UT BRZ SCR\ , FBG '�1ESH .4DJ HI�GES ', CHESI'�l.�T BRZ HDWR , �O BRK!�1LD y iII I Line i9 Qty 1 CO'�FIGURED l:i1T RO= VJ=96 1;3 H=53 3�16 CC?4�?-4 j WEST ELEV:4T10'.v FRAME= W=96 H=52 1 1%16 CASEVIENT N'INDOW CC24�2 � P 1 l ' Dp Ratin�= DP RATI'vG=�0 ; U-value= .3s ! Shgc=."?0 i Bl1= 1 � V�'=?4 � H=�2 l Ul6 H:LEFT I W;'BREATHERTI,BE ; i3OE-366 I DU.AL GLS I I��I� � ��' CHEST'�IL'T BRZ SCR'� � FBG MESH , ADJ HI\GES ! STD LOCKS •. CHEST\L'T �I P � ' I � BRZ HDWR � '�O BRK!vILD ` � ' CASEMENT WINDOVI' � ;� ! CC24�3 ' P12 i Dp.ratin�= 50 U-value°.3? Sh�c= ?? �, BC ° VV=24 , H=�2 i i � ti � ��'���� i, i 1 1 l6 j STAT , W,BREATHERTL'BE LOE-366 DUAL GLS '�O SCR. j � O � I • BRK?v1LD �.z, . :< - "` CASEMENT V4'[�DOV1` CC2�53 � P 13 Dp.rating= 50 , U-value=.32 , Shgc=.22 I BL'= VV=24 H=52 1 1'16 ' STAT W'%BREATHERTCBE ' LOE-366 ! Di;.AL GLS ?�O SCRti I '�O BRKMLD CASEMEtiT Vb"I\DOW CC2452 � P 14 ; Dp Rating=DP RATI?�G=�0 � U-value= .33 i Shgc= .30 Bl, _ W'=34 H=�? l li t6 ; H:RGHT ', W!'BREATHERTliBE � LOE-�66 I DI;AL GLS ' CHEST'�IUT BRZ SCR'� j FBG !�1ESH ' ADJ HI'.�IGES ' STD LOCKS CHEST'vUT BRZ HDWR ; �O BRKMLD Line 2� Qty l CO'�FIGURED lirlT RO=W=24 li2 H=48 1!2 CC?4�8-1 \ORTH ELEVATION FRAME= W`=34 H=48 CASE:VIErT WI`DOW CC24�8 'i P!l ' Dp Ratin�= DP RATI?�G=�0 ! U-value= .33 j Shgc= 20 i B�_ W=24 I, H=48 H:RGHT i W!BREATHERTL"BE � LOE-366 ', DI;AL GLS ', � CHESTNL`T BRZ SCRti ; FBG !v1ESH ! ADJ HI'.vGES ' STD LOCKS ' CHESTtiL;T �I � i � �� BRZ HDWR ; NO BRKVtLD I ' � „I , �--I liiii B�:Cor� Dro:l �'.:;:6.�?_.1'1161 P�2_�±c�l -1 Bi�1 D'<'I�ii: � '_t)]? 1IOt:VTAI\ ST:�TES BLDG PRODLCTS QLOTE - QT000900 Bid For: �ob .\ame Cash Sale a�pen Rid�e addition Eacn Total Line 26 Qt� l C�O�FIGIREDLI(T - RO=�'_?4 I ? H=-18 I^ CC2�-�8-1 \ORTH ELEV.�TiO� FR.-�!�lE_ ��'_?-1 H=�38 CASE'�tE\T V11\DOw CC2�-38 , P f 1 Dp Ratina— DP RATI'�G = �0 , �'-value= .33 Shoc= ?0 ', Bl ° - `,�'_�-1 H=-�8 H:RGHT � BREATHERT�'BE I LOE-366 ; DUAL GLS ' — � �HEST'�liT BRZ SCRti ; FBG \IESH ; .�DJ H1'�GES STD LOCKS ', CHEST'�l:T ; ' ;' BRZ HDN R '�O BRK!�1LD i' nlil I �' Line 28 Qty 1 CONFIGI,RED liti1T RO=W=2� 1;2 H=48 1/? CC2448-1 � '�ORTH ELEVATIO'v fRA!v1E= w'=3� H=48 CASE'.V1E;�T VI�'ItiDOW CC2448 � PI 1 I Dp Rating= DP RAT['�G°50 � li-value= .33 j Shgc=?0 ', BL'_ T �— W=34 ! H=48 i H:RGHT ! WBREATHERTUBE '�, LOE-366 , DL'AL GLS I ! � CHESTNUT BRZ SCR?� I FBG :�]ESH , .ADJ HINGES , STD LOCKS � CHESTNUT ' BRZ HDWR �; �i0 BRK!vILD A �i � i . ,_—�.� Line 30 Qty 1 CONFIGI,RED UtiIT RO= W=24 1%3 H=48 I%2 CC2448-1 ', '�;ORTH ELEVATI01� FRA!vlE =W°2-� H=48 CASE!�IENT WI'�DOW' CC2�48 ', P1 1 ' Dp Rating= DP RATItiG =�0 U-value= .33 Sh�c= ?0 � Bl1= ? �—� W=24 ! H=48 '�, H:RGHT W,'BREATHERTL;BE ; LOE-366 '� DUAL GLS ! ' CHESTI�liT BRZ SCR'.�I i FBG MESH ADJ HINGES ', STD LOCKS ! CHEST?�C;T z I' BRZ HDWR '; NO BRKMLD II �� i � ; . ; ; ✓�' � _�.�"? ��.� �' � �___ �.�_____ ; ____ __________�_____.__ .--.- ____ ____.____—___----______ , � z ______ _ __�_._. � ���er� L° � ___��..s"��..�.�._ � .� � = z l ��S-" .1� .�i� P �_ ;J w___._...__�__ __ �___�_..�_�____,_�._ ;v�h�ta � ��h f�i�.�___ __�_____�_ _____� _ � � g S�l�� ___._�._ , ; ; :S��!C �-Pp.�.�n�_�._�v___._._____ _____._ .____.._�_____._______.._._ 3 00 � Y�4 a � ____.__------_ .__�______ _ _ _ ___ . _ ._. __.__________ ___._.__._ _/s�a� v,�- �3aa � ;; �%s w��� _________._ __ ___________ �_.___________ __.___.___�_ i zao ��- _____ , D- 1_._ _ . __ � , _ _ _ -_______A�__ _ .___ ______- .__�_ _�__ _____._�_ t zdo ��- � ° D- ��� _ � 7ZV �� � , � �- _ ___._..----- _-_ _______ _____._. .__ ____�____ ______. __. ____ Zdc�O VA- ____ : __ �____..___.__ --_�. .._____.______ _ _ ,._____ ---_ __.._. . __.____ __ .,___.�`�__�._�7�.5��/�- �... __�_._.__ ____._ .___.�_�______ _�__._ � __. __ ______.__.._____.._ ____ _�_____ } �.l s�1� ��• /��____. _.__ _______. ..__ ._______ . . .._./�? � v�- .�.Ru►'+a„a�o�_��__�U�o____ . .._��-`�/C� t/x� : �s �ro �rr�- �� _ _ --- __ �_ __ �__ _ ..._______��_________�_.___w �__ ___ . � _ � . .; �;�e r ____3�✓� ._ _ _ _ _ _ __ ,__ _ _. _ ___v_.____. _ _ __ � ; P„�,•��� �cxx-, �a _ _ __ ---__ _ - --_ ' ���� � �U�. ��`� U� � _.. I ___ _ _ .. �- _ _� ____._ ..___ ._____.__ ___ __.__ ___ ___� . _— : ...�g�� ,�,��� ,'��,� _ __ _ . _ �:�� ✓� , , � .: _ _ _ _ _ _ ?, �- I D �.�- _ ,� �1��� _ _ .: _ �_ ` _ .. � , . ►,�� � -��.� ��`�jj�,,,,r ,�Ec:, _:. .1 r _,�.�. r; „ . �,;.�'� ` ..-_ . � --—� \ .._�.. �... �1��.1►1�.�� �\ . . -- - __ ____ __---_---__�_______ ._..__. ____-- ---____ -_ _� �__ _ _ _ ___ � ---------�--- - �� •, __ ____ --_- __ ___ _.____ _ -_.___. __.____ _ __ -- � __. � _ ---_.__ _____ _____ _ _ _ _ _ _ -� _ _ ___ _- __ ____ __ _ � Q � D a _._ . _ ____ __ ____ . _. . __. _.___ � � ___ _ _.� � _ _.� � � ;� __ ,� � � � � __._ _ _ _ _ . _ _ _ _ __ _ _ __�_ _ _ _._ __ � 1 � _�__.________.- -_____ __--- _._ .. ____ ___ _____ __. _ _ _ _ _ _ _ _- �i __ _ _____ ._ _. _ _ __ _ ___.______ � � � ° IJ� -�<a _ __.� _ _ __ _ _�-�--C_N_�___� _ _ _. �p_ -��--�- �^__. _______ . ; , •t.. � �y � , -__ ---___ _ _ _ ___._ _ , __ �_ __ __ � _. � _ � � ------- -- - -- __ ___._-.--- _- ---� --- -- -- -- _ __ --� _ - `> ��:____._____ __ _ ___ _ __ ____--_ . _ _ __ _______ . ._. ___._ __ ___ . ____ _ _ _ ____ _ . _------ �_ ___ _ __ _ _ _ _ _ ___ ___ ---___._ __.__ _ ____----___. ___------______. _----_____-- „ - , � _ _.f._----.._______---____.._—________. ______ ____.__ __.__ ____ _ _ _ __ __---�_.__ � : j ; ��.___._ __ _____ _ _ ____ _ . _____ __. _ . ___ _ ___ __ _ _ _ __ _ ______ ._ _.. � �._�_�_ __ ______.__ __ ___ _ _ _.______. ___ _ _ _ _ �„ !'�i;�''�`::"? w' '� ;3`�'��":!:��'� �r��"'"�1+.:?i"� '�,�„� Compliance Certificate Project Title: Aspen Ridge Addition �� Energy Code: 2009 IECC Location: Vail,Colorado Construction Type: Single Family Project Type: Addition/Alteration Heating Degree Days: 9248 Climate Zone: 6 Construction Site: Owner/Agent: Designer/Contractor: 1575 Aspen Ridge Bryan Johnson Bryan Johnson Vail,CO ContractOne ContractOne Permit#TBD PO Box 8530 PO Box 8530 Permit Date:TBD Avon,CO 81620 Avon,CO 81620 970-390-1068 970-390-1068 bryan@contractone.us bryan@contractone.us � : , � . °� - �� � ,�: �� : '��;�", � Compliance:4.7%Better Than Code Maximum UA:211 Your UA:201 The%Better or Worse Than Code index reflects how close to compliance the house is based on code trade-off rules. It DOES NOT provide an estimate of energy use or cost relative to a minimum-code home. � 6 � • Ceiling 1:Cathedral Ceiling 2190 49.0 0.0 48 Wall 1:Wood Frame, 16"o.c. 1705 20.0 0.0 89 Window 1:Metal Frame with Thermal Break:Double Pane with 193 0.330 64 Low-E Compliance Statement: The proposed building design described here is consistent with the building plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2009 IECC requirements in REScheck Version 4.4.3 and to comply with the mandatory requirements listed in the RE ck Inspection Checklist. P � �� /� � -- __ _-- ---- - - Name-Title Si Da e Project Title: Aspen Ridge Addition RepoR date: 07/19/12 Data filename: D:\Users\bryanj\DocumentslREScheck\655_AspenRidge.rck Page 1 of 4 �,�5�����.k � ���ww��� ���r�4��� 4,�.3 Inspection Checklist Energy Code: 2009 IECC � Location: Vail,Colorado ' Construction Type: Single Family Project Type: Addition/Alteration Heating Degree Days: 9248 Climate Zone: 6 Ceilings: ❑ Ceiling 1:Cathedral Ceiling,R-49.0 cavity insulation Comments: Above-Grade Walls: ❑ Wall 1:Wood Frame,16"o.c.,R-20.0 cavity insulation Comments: Windows: ❑ Window 1: Metal Frame with Thermal Break:Double Pane with Low-E,U-factor:0.330 For windows without labeled U-factors,describe features: #Panes Frame Type Thermal Break? Yes No Comments: Air Leakage: � Joints(including rim joist junctions),attic access openings,penetrations,and all other such openings in the building envelope that are sources of air leakage are sealed with caulk,gasketed,weatherstripped or otherwise sealed with an air barrier material,suitable film or solid material. � Air barrier and sealing exists on common walls between dwelling units,on exterior walls behind tubs/showers,and in openings between window/door jambs and framing. � Recessed lights in the building thermal envelope are 1)type IC rated and ASTM E283 labeled and 2)sealed with a gasket or caulk belween the housing and the interior wall or ceiling covering. � Access doors separating conditioned from unconditioned space are weather-stripped and insulated(without insulation compression or damage)to at least the level of insulation on the surrounding surfaces.Where loose fill insulation exists,a baffle or retainer is installed to maintain insulation application. � Wood-buming fireplaces have gasketed doors and outdoor combustion air. � Automatic or gravity dampers are installed on all outdoor air intakes and exhausts. Air Sealing and Insulation: � Building envelope air tightness and insulation installation complies by either 1)a post rough-in blower door test result of less than 7 ACH at 50 pascals OR 2)the following items have been satisfied: (a)Air barriers and thermal barrier: Installed on outside of air-permeable insulation and breaks or joints in the air barrier are filled or repaired. (b)Ceiling/attic:Air barrier in any dropped ceiling/soffit is substantially aligned with insulation and any gaps are sealed. (c)Above-grade walls:Insulation is installed in substantial contact and continuous alignment with the building envelope air barrier. (d)Floors:Air barrier is installed at any exposed edge of insulation. (e)Plumbing and wiring:Insulation is placed between outside and pipes.Batt insulation is cut to fit around wiring and plumbing,or sprayed/blown insulation extends behind piping and wiring. (f) Corners,headers,naROw framing cavities,and rim joists are insulated. (9)Shower/tub on exterior wall:Insulation exists between showers/tubs and exterior wall. Sunrooms: � Sunrooms that are thermally isolated from the building envelope have a maximum fenestration U-facior of 0.50 and the maximum skylight U-factor of 0.75.New windows and doors separating the sunroom from conditioned space meet the building thermal envelope requirements. Project Title: Aspen Ridge Addition Report date: 07/19/12 Data`ilename: D:\Users\bryanj\Documents\REScheck\655_AspenRidge.rck Page 2 of 4 Materials Identification and Installation: � Materials and equipment are installed in accordance with the manufacturer's installation instructions. � Materials and equipment are identified so that compliance can be determined. � Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment have been provided. � Insulation R-values and glazing U-factors are clearly marked on the building plans or specifications. Duct Insulation: � Supply ducts in attics are insulated to a minimum of R-8.All other ducts in unconditioned spaces or outside the building envelope are insulated to at least R-6. Duct Construction and Testing: � Building framing cavities are not used as supply ducts. � All joints and seams of air ducts,air handlers,filter boxes,and building cavities used as retum ducts are substantially airtight by means of tapes,mastics,liquid sealants,gasketing or other approved closure systems.Tapes,mastics,and fasteners are rated UL 181A or UL 181 B and are labeled according to the duct construction. Metal duct connections with equipment and/or fittings are mechanically fastened.Crimp joints for round metal ducts have a contact lap of at least 1 1/2 inches and are fastened with a minimum of three equally spaced sheet-metal screws. Exceptions: Joint and seams covered with spray polyurethane foam. Where a partially inaccessible duct connection exists,mechanical fasteners can be equally spaced on the exposed portion of the � joint so as to prevent a hinge effect. I Continuously welded and locking-type longitudinal joints and seams on ducts operating at less than 2 in.w.g.(500 Pa). � All ducts and air handlers are located within conditioned space. Temperature Controls: � Where the primary heating system is a forced air-furnace,at least one programmable thermostat is installed to control the primary heating system and has set-points initialized at 70 degree F for the heating cycle and 78 degree F for the cooling cycle. � Heat pumps having supplementary electric-resistance heat have controls that prevent supplemental heat operation when the compressor can meet the heating load. Heating and Cooling Equipment Sizing: � Additional requirements for equipment sizing are included by an inspection for compliance with the International Residential Code. � For systems serving multiple dwelling units documentation has been submitted demonstrating compliance with 2009 IECC Commercial Building Mechanical and/or Service Water Heating(Sections 503 and 504). Circulating Service Hot Water Systems: � � Circulating service hot water pipes are insulated to R-2. � Circulating service hot water systems include an automatic or accessible manual switch to tum off the circulating pump when the system is not in use. Heating and Cooling Piping Insulation: � HVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F are insulated to R-3. Swimming Pools: � Heated swimming pools have an on/off heater switch. � Pool heaters operating on natural gas or LPG have an electronic pilot light. � Timer switches on pool heaters and pumps are present. Exceptions: Where public health standards require continuous pump operation. Where pumps operate within solar-and/or waste-heat-recovery systems. � Heated swimming pools have a cover on or at the water surface.For pools heated over 90 degrees F(32 degrees C)the cover has a minimum insulation value of R-12. Exceptions: Covers are not required when 60%of the heating energy is from site-recovered energy or solar energy source. Lighting Requirements: r� A minimum of 50 percent of the lamps in permanently installed Iighting fixtures can be categorized as one of the following: (a)Compact fluorescent (b)T-8 or smaller diameter linear fluorescent (c)40 lumens per watt for lamp wattage<= 15 Project Title: Aspen Ridge Addition Report date: 07/19/12 Data filename: D:\Users\bryanj\Documents\REScheck\655_AspenRidge.rck Page 3 of 4 (d)50 lumens per watt for lamp wattage>15 and<=40 (e)60 lumens per watt for lamp wattage>40 Other Requirements: ,� Snow-and ice-melting systems with energy supplied from the service to a building shall include automatic controls capable of shutting off the system when a)the pavement temperature is above 50 degrees F,b)no precipitation is falling,and c)the outdoor temperature is above 40 degrees F(a manual shutoff control is also permitted to satisfy requirement'c'). Certificate: � A permanent certificate is provided on or in the electrical distribution panel listing the predominant insulation R-values;window U-factors;type and e�ciency of space-conditioning and water heating equipment.The certificate dces not cover or obstruct the visibility of the circuit directory label,service disconnect label or other required labels. NOTES TO FIELD:(Building Department Use Only) Project Title: Aspen Ridge Addition Report date: 07/19/12 Data filename: D:\Userslbryanj\DocumentslREScheck\655_AspenRidge.rck Page 4 of 4 . ' � • ����� ��'��� ,� �. � w., y �;; ��' ' � �,,�� �� �, �; � : - � ' x � . . a�;���� � � �. � ,m. . , ..... �A,uk'.,..ro...,,.d"ro,Y , ,r.�_..�..,,4,.Jf.� .�� Ceiling I Roof 49.00 � Wall 20.00 Floor/Foundation 0.00 Ductwork(unconditioned spaces): � �� � � f �� s�� �� �K�; ��, . .- '�r,� +R^. ,.: '��"�i�'�M M"����n�"`s.��,m�'��"x4,'� ,+�� ._��mF��.,a�:.,:���. Window 0.33 Door a?'��� ^b'� yy�i6;��"��'_�� "�., ,�� ���,„.��ni,ar�;b�is��, a� ,�� � , �"� Heating System: Cooling System: Water Heater: .�su�°•.�t. m"� i �; '%a��": ;� Name: Date: Comments: � � Department of Community Development 75 South Frontage Road TOWN OF VAtL` va�i, co s�ss� Tel: 970-479-2128 www.vailgov.com Development Review Coordinator BUILDING PERMIT APPLICATION (Separate applications are required for alarm &sprinkler) Project Street Address: Project#: �����—� � 1575 Aspen Ridge (Number) (Street) (Suite#) DRB#: �������� Building/Complex Name: Lions Ridge Building Permit#:�� � �p��Q � Contractor Irr�ormation Lot#: Block# Subdivision: � ContractOne Business N�me: Business Address: PO Box 8530 Work Class: New�j Addition�j Alteration(� City Avon State: C� Zip: 81620 Type of Buildin Contact Name: BrYan Johnson Single-Family�j Duplex�j Multi-Family�j Commercial � Other�j Contact Phone: 970-390-1068 Contact E-Mail: bryan@contractone.us Work Type: Interior� Exterior Q Both� I hereby acknowledge that I have read this application,filled out Valuation of in full the information required,completed an accurate plot plan, Work Included Plans Included Work and state that all the information as required is correct. I agree to ---- --- ---�-��-----�— �- ------- comply with the information and plot plan, to comply with all Town Eledrical Oi Yes O)No OYes �i No 7600 ordinances and state laws, and to build this structure according to Mechanical �Yes O)No QYes QNo 1800 the town's zoning and subdivision codes, design review ap- proved, Intemational Building and Residential Codes and other Plumbing �Yes OjNo �Yes �No 9600 ordinances of the Town applicable thereto. Building Oi Yes allo QYes QNo 188690 X Value of all work being performed: $ 207690 � n Signature(Required) �value based on IBC Section 109.3&IRC Section 108.3� Electrical Square Footage 1915 Applicant Informa6on Detailed Scope and Location of Work: Applicant Name: Bryan Johnson Addition of sitting room and 3 bedrooms\baths Applicant Phone: 9�0-390-1068 Applicant E-Mail: bryan@contractone.us Project Information Owner Name: Ronald Kruszewski Parcel#: 2�03-122-02-014 (For Parcel#,contact Eagle County Assessors Office at(970328-8640 or visit www.eaglecounty.us/patie) (use additional sheet if necessary) For Office l se Onl�: Fee Paid: � �fl�� �j(p Date Received: D � � � � � � Received From: _�4ty1}.N :�p�-►t�T4�� c.�sh Check #�,, JUN 2 5 ZC112 CC: ; /MC Last 4 CC#�� ex p date: �' Auth #t��� TOWN OF VAIL i�-n,t��-�o i� State of Colorado Asbestos Testing &Abatement Requirements Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex- posure to harmfui asbestos. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements at the contact info listed below. When is asbestos testina re4uired? ANY building projects disturbing more than these threshold levels of building materials require asbestos testing: One-and Two-Family Dwellings: 32 square feet All Others(commercial spaces,hotel rooms, etc): 160 square feet Definition of a single-family dwelling:any dwelling unit that is used primarily for a single family, including multi-family/condominium units,and fractional fee units. Asbestos testing results must be provided with your application for a building permit. Tests which identify POSITIVE results at more than 1% require abatement by a State-certified abatement contractor. The air clearance letter or form must be submitted to the Town of Vail before the building permit will be issued. Project Checklist My project falls into the category checked below: � Will not disturb more than the threshold limits identified above. � Tested negative, or at 1% or below (1 copies of test results included) � Tested positive at more than 1%, requires abatement (1 copies of test results included) Tips&Facts: • Even recent construction projects may include asbestos-containing materials, so buildings of a�age require testing. • The "1989 Ban" on asbestos-containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit Court of Appeals vacated much of the so-called "Asbestos Ban and Phaseout" rule and remanded it to the EPA.Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos-containing product categories was set aside and did not take effect." - CDPHE Asbestos test results should be submitted to: Town of Vail, Communiry Development, 75 S Frontage Rd, Vail, CO, 81657. Town of Vail Contact: State of Colorado Contact: Fire Prevention Bureau Colorado Department of Public Health Vail Fire Department and Environment 75 S Frontage Rd Asbestos Compliance Assistance Group Fire_inspectors@vailgov.com 303-692-3158 970-479-2252 a sbestos@state.co.us 01-Jan-II Indoor Environmental Services, Inc Dba: Q Consulting, Inc. Project: 1575 Aspen Ridge Rd, Vail, Colorado Asbestos Sampling Report — Page 1 of 2 July 8, 2010 Bryan Johnson Contract One On July 7, 2010, Quentin Danziger conducted an asbestos inspection of the suspect materials to be disturbed during the planned remodel. Asbestos was NOT detected,as described below. Homogenous Description Number %Asbestos Square Friable? Area of Feet Sam les O1 Bumpy Texture 3 None Detected 02 Flat Texture 3 None Detected 03 Sheetrock/Joint Compound 3 None Detected 04 Laundry Linoleum 3 None Detected OS Grout 3 None Detected BACKGROUND: This structure is scheduled for a remodel. Indoor Environmental Services was requested to conduct an asbestos inspection of the suspect materials that will be disturbed. This inspection includes only suspect materials that are visible to the inspector. If other suspect materials become visible during demolition, they must be sampled before they are disturbed. Examples of suspect materials include but are not limited to: linoleum, floor tile, ceiling tile, mastic, sheetrock,joint compound, roofing materials, etc. There are over 3000 known asbestos containing materials. SAMPLING PLAN: Colorado State Requirements - For each homogenous area of less than 1000 syuare feet, a minimum of three samples must be collected in random areas. For each homogenous area of 1000—5000 square feet, a minimum of five samples must be collected in random areas. Areas of 5001 square feet or greater require a minimum of 7 samples. These laws are defined by the EPA (AHERA) and Colorado State Regulation 8. Indoor Environmental Services, Inc Dba: Q Consulting, Inc. Project: 1575 Aspen Ridge Rd,Vail, Colorado Asbestos Sampling Report — Page 2 of 2 Determination of homogenous sampling areas—Homogenous Areas are determined by type of suspect material,texture, color and location. Determination of random sampling areas—The samples were collected in a random manner. Thank you for using Q Consulting, Inc. We are proud to be your local indoor air quality consultants. We look forward to working with you in the future. Quentin Danziger, BS, CIE, ABI—Colorado Asbestos Inspector Certification # 12781 Q Consulting, Inc. 970-390-0087 QConsultingInc@yahoo.com EMSL Analytical, Inc. 7330 S. Aiton Way Building 12 Suite A, Centennial, CO 80112 Phone.'j303)740-570U fax: (303�741-1400 Email: dEn�er_�at,��crosl.conr Att": Quentin Danzi er g Customer ID: INES78 Q Consulting, Inc. Custamer PO: PO Box 997 Received: 07/08/10 9:20 AM Vail, CO 81658 EMSL Order: 221001298 Fax: Phone: (970)390-0087 EMSL Proj: Project: 1575 Aapen Ridge Rd.-Vail Analysis Date: 7/8/2010 Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy Non-Asbestos qgbe8�g Sample Description Appearance % Fibrous % Non-Fibrous % Type 01-01 Lock off Regular White 100% Non-fibrous(other) None Detected 2?�OO�Zyg-000� Te�Qure Non-Fibrous Homogeneous 01-02 Lock off Regular White 100°� Non-fibrous(other) None Detected ZZ�oo�2ye-0002 Texture Non-Fibrous Homogeneous 01-03 Lock off Regul� White 100% Non-fibrous(other) None Detected 221001298-0003 Te�ure Non-Fibrous Homogeneous 02-01 Upper Flat Te�Qure White 100% Non-fibrous(other) None Detected � 22f001298-0004 Non-Fibrous Heterogeneous 02-02 Upper Flat Texture White 100% Non-fibrous(other) None Detected 221001298-0005 Non-Fibrous Homogeneous 02-03 Upper Flat Texture White 100% Non-fibrous(other) None Detected 221001298-0006 Non-Fibrous Homogeneous 03-01-Joint SheetrocWJoint White 100% Non-fibrous(other) None Detected Compound Compound Non-Fibrous 221001298-0007 Homogeneous Initial report from 07/08/2010 13:32:49 Analyst(s) Jillian Doherty(18) Erin Orthun,Laboratory Manager or other approved signatory EMSL maintains liability Iimite0 to wst of analysis. This report relates only to Vie samples reportetl and may not be reproCuced,e�¢ept in full,without wntten app�oeal by EMSL EMSL bears no responsibility for sample collection actiHties or analytical methoC limifations. Irrierpretation and use of test results are the responsibility of the client This report must not be use0 by the client to claim product certification,appro�al,or entlasement by NVLAP,NIST or any agency of the fetleral govemment. Non-fnaWe organically bountl matenals present a problem matnx antl therefore EMSL recommends gravimetnc reduGion pnor to analysis. Samples received in good condition unless otherwise noted. Sam les anal ed b EMSL Anal -cal,Inc.7330 S.Alton Wa Buildin 12 Suite A,Centennial CO Test Repart PLM-7.21.0 Printed:7/8/201 0 1 32:49 PM 1 EMSL Analytical, Inc. 7330 S. Alton Way Building 12 Suite A, Centennial, CO 80112 Phone: {303)740-5700 Fax: (30�1'41-1a0G Finad� cienyerlat�.(ci�msl_com Att": Quentin Danzi er g Customer ID: INES78 Q Consulting, inc. c�st«„e�Po: PO Box 997 ReCeived: 07/08/10 9:20 AM Vail, CO 81658 EMSL Order: 221001298 Fax: Phone: (970)390-0087 EMSL Proj: Project: 1575 Aspen Ridge Rd.-Vail Analysis Date: 7/8/2010 Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy Non-Asbestos Asbestos Sample Description Appearance °k Fibrous % Non-Fibrous % Type 03-01-Drywall Sheetrock/Joint Brown/Peach 10% Cellulose 85% Non-fibrous(other) None Detected 22�OO�Zyg-OOO�A Compound Fibrous 5% Glass Heterogeneous 03-02-Joint Sheetrock/Joint Whde 100% Non-fibrous(other) None Detected Compound Compound Non-Fibrous 221001298-0008 Homogeneous 03-02-Drywall Sheetrock/Jont Brown/Peach 10% Cellulose 85% Non-fibrous(other) None Detected 221001298-0008A Compound Fibrous 5% Glass Heterogeneous 03-03-Joint SheeVock/Joint White 100% Non-fibrous(other) None Detected Compound Compound Non-Fibrous 22f001298-0009 Homogeneous 03-03-Drywall SheeVock/Joint BrowNPeach 10°� Cellulose 85°� Non-fibrous(other) None Detected 22f001298-0009A Compound Fibrous 5% Glass Heterogeneous 0401 Laundry Lindeum Brown 20% Cellulose 70% Non-fibrous(other) None Detected zz�oo�z9s-oo�o Fibrous 10% Glass Heterogeneous 04-02 Laundry Lindeum Gray 20% Cellulose 70% Non-fibrous(other) None Detected 22f001298-0011 Fibrous 10% Glass Heterogeneous Initial report fran 07/08/2010 13:32:49 Analyst(s) Jillian Doherty(18) Erin ORhun,Laboratory Manager or other approved signatory EMSL maintains liability Ilmrted ro cost of analysis. This repoA relates only to the samples reported and may not De reproduced,e�ept in full,without wntten appm�al by EMSL EMSL bears no responsibiliry for sample wllection actiNties or analyBCal meCiod limitations. Interpretation and use of test 2sWts are the responsidlity of the client This report must not be used by the client to Gaim product certification,approral,or entlorsement by NVLAP,NIST or any agency of the feGeral govemment. Non-friade organically bountl materials preserrt a problem matrix and therefore EMSL recommends gravimetric reduction prior to analysis. Samples recei�ed in good conGition unless othervvise notetl. Sam es anal b EMSL Anal -cal,Inc.7330 S.Alton Wa Buildi 12 Suite A,Centennial CO Test Report PLNF-7.21.0 Printed:7/8/2010 1:32:49 PM 2 EMSL Analytical, Inc. 7330 S. Aiton Way Buiiding 12 Suite A, Centennial, CO 80112 Phone: (303)740-570C Fax: ��01)741-140Q Email: denverlabmemsl.com Att": Querrtin Danziger Custamer ID: INES78 Q Consulting, Inc. Customer PO: PO Box 997 Received: 07/OS/10 9:20 AM Vail, CO 81658 EMSL Order: 221001298 F�: Phone: (970)390-0087 EMSL Proj: Project: 1575 Aspen Ridge Rd.-Vail Analysis Date: 7/8/2010 Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized Light Microscopy Non-Asbeatos qg �S Sample Description Appearance % Fibrous % Non-Fibrous % Type 0403 Laundry Lindeum Gray 20% Cellulose 70% Non-fibrous(other) None Detected n�oo�z9a-oo�z Fibrous 10% Glass Heterogeneous 05-01 Grout Tan 100°� Non-fibrous(other) None Detected 221001298-0013 Non-Fibrous Homogeneous 05-02 Grout Gray 100% Non-fibrous(other) None Detected 22�oo�2sa-0o�a Non-Fibrous Homogeneous 05-03 Kitchen Grout Gray 100°/a Non-fibrous(other) None Detected 22f001298-0015 Non-Fibrous Homogeneous Initial report from 07/08/2010 13:32:49 Anayst(s) Jillian Doherty(f 8) Erin Orthun,Laboratory Manager or other approved signatory EMSL mairnains IiaDility limited to wst of anatysis. This report relates only to the samples reportetl and may not be reproduced,e�ept in full,without wntten approeal by EMSL EMSL bears no responsibiliry for sample collection actiNties or analylical method limifations. Interyretation and use of test 2sults are the responsibility of the client. This repat must not be used by the client to claim product ceNfication,approval,or enGOrsement by NVLAP,NIST or any agency of the tederal govemment. Non-fnade organically bound matenals present a problem mauix and therefore EMSL recommends graHmetnc retluaion pnor to analysis. Samples received in gootl condition unless otherwise noted. Sam les anal zed b EMSL Anal -cal,Inc.7330 S.Alton Wa Buildin 12 Suite A,Centennial CO Test Report PLM-721.0 Printed:7/8/2010 1:32:49 PM THIS IS THE LAST PAGE OF THE REPORT. 3