Loading...
HomeMy WebLinkAboutB12-0260NOTE: TH/S PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ,. TC}WN OF VAII,' . Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 COMBINATION BLDG PERMIT Permit #: 612-0260 Job Address: 4506 SPRUCE WY VAIL Location......: Ridgeview Square Unit 2 Parcel No....: 210112304002 CONTRACTOR SKI COUNTRY CONSTRUCTION 07/10/2012 JEFF CHAVIS PO BOX 9 FRISCO CO 80443 License: C000003544 OWNER ROBERTSON, ANNE 06/26/2012 4506 SPRUCE WY 2 VAI L CO 81657 APPLICANT SKI COUNTRY CONSTRUCTION INC 06/26/2012 PO BOX 9 FRISCO CO 80443 Project #: PRJ12-0330 Applied.....: 06/26/2012 Issued. . . : 07/17/2012 Phone: 970-668-9969 Phone: 970-688-9969 Description: WATER DAMAGE REPAIR DRYWALL PATCH WORK, PAINT, CABINETS, FLOORING INSTALLATION Occupancy: Type Construction: Valuation: $28,050.24 ....,...>.x.....x ...............�....,.x........,....,...........,,,._.........,., FEE SUMMARY ....«.........�.,,................,..,,......,...,.........,,..........,....,..,. Building Permit -----------> $431.65 Bldg Plan Check ----------> $280.57 Use Tax Fee-----------------------> $361.00 Electrical Permit ---------> $0.00 Elec Plan Check ----------> $0.00 Restuarant Plan Review--------> $0.00 Mechanical Permit ------> $0.00 Mech Plan Check ---------> $0.00 Additional Fees--------------------> $200.00 Plumbing Permit --------> $0.00 Pimb Plan Check ---------> $0.00 Recreation Fee--------------------> $0.00 Investigation-----------------------> $0.00 Will Call------------------------------> $5.00 TOTAL PERMIT FEES--------------> $1,278.22 Payments-------------------------------> $1,278.22 BALANCE DUE------------------------> $0.00 ...... � ........................................................................,�.,�,,.,,,.,,,,........,.,...,....................,..., ......,.....,......,,........,..,,,...,..,...,.... DECLARATtONS I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM - 4:00 PM. combination permit_012811 � ................>,.,,,........,�.....,....,..............,,....,.,.....,..,...........,...,..,......,,.,......,,...........,,,....,........,..,.....<........,....,.,..,...,. �,...... CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF Permit #: 612-0260 Owner: ROBERTSON, ANNE Ridgeview Square Unit 2 Address: 4506 SPRUCE WY VAIL Location: ............................................................................................................................................ � �...,....... �.........,.........,....... combination permit_012811 ! � TOWN OF VAI� ' �***.***...***,*****.********..******************************�****�****..**„***,..******************.************************..**,.*.,.�*.,�.�********** REQUIRED INSPECTIONS AND STATUSES Permit #: 612-0260 Owner: ROBERTSON, ANNE Ridgeview Square Unit 2 Address: 4506 SPRUCE WY VAIL Location: .*,.*****�*.*******,.�**«****�*********,.,.*******,.**���********«*******************�,.**.****.�*�****„*�******,,,,***************.,**„**.,***�..**..�**,�**.**** Item: 00030 BLDG-Framing Item: 00050 BLDG-Insulation Item: 00060 BLDG-Sheetrock Nail Item: 00070 BLDG-Misc. Item: 00090 BLDG-Final combination permit_012811 ****«******************************+******************************************************** TOWN OF VAIL, COLORADO Statement ***********�++*****************************************+**�*****************************�*** Statement Number: R120000926 Amount: $492.46 07/17/201210:44 AM Payment Method:Credit Crd Init: DR Notation: VISA MARTINA TATAREK (SKI COUNTRY CONST) ----------------------------------------------------------------------------- Permit No: B12-0260 Type: COMBINATION BLDG PERMIT Parcel No: 2101-123-0400-2 Site Address: 4506 SPRUCE WY VAIL Location: Ridgeview Square Unit 2 Total Fees: $1,278.22 This Payment: $492.46 Total ALL Pmts: $1,278.22 Balance: $0.00 **********************+********************************************************************* ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ BP 00100003111100 BUILDING PERMIT FEES 105.50 CL 00100003123000 CONTRACTOR LICENSES 200.00 PF 00100003112300 PLAN CHECK FEES 53.56 UT 11000003106000 USE TAX 40 133.40 TOWN OF UpIL COM DEU 75 S FAOHTA6E RD. VRII� CO B1657 978-419-1324 iERMINAI I.D. � 2AB2 IERCHAHT N: UISA t##�k#�iCl�t1468t SALE BRTCH; BBB518 INV:000003 AUTH:680168 JUL 17. 12 09:39 TOTAL �492.46 CUSTOlER COPV TOWN OF VAIL' Department of Community Development 75 South Frontage Road Vail, CO 81657 Tel: 970-479-2128 www.va i Igov.com Development Review Coordinator BUILDING PERMIT APPLICATION (Separate applications are required for alarm & sprinkler) Project Street Address: Project #: 1!/J �Z —�� 3 V y`�?- '' ^ � DRB #: (Number) (Street) (Suite #) -7�� Buildin /Com lex Name: � Building Permit #: � `� ( �lic-� � 9 p ,el ���/iF"t.d `��G^�:�.a-�.=- Contractor Information Lot #: Block # Subdivision: Business Name: Ct! 1,r � �� ��� � Work Class: New (�j Addition (�j Alteration (�j Business Address: ; ���`.� City ��jSGI� State: �G� Zip: ,����,� Type of Building: Single-Family Contact Name: ,,��".(/.�lJ�l' Commercial �j ContactPhone: �%%7'� - �f�S"'r31o,�9 Contact E-Mail: �� �i I�UlP�j C�l[$T�i ����Gype' �''L. I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review ap- proved, International Building and Residential Codes and other ordinances of the Town applicable thereto. X _� er/Own rs Representative Signature (Required) Applicant Information �j Duplex (�j Multi-Family (�) Other �j Interior �xterior � Both � Valuation of Work Included lans Included Work Electrical �Yes o Yes �No Mechanical �Yes )No Yes �No t Plumbing �Yes No �Yes �No � Building es �No �Yes �No Value of all work being performed: $ a� ,��' C� -�`� i !�value based on IBC Section 109.3 $ IRC Section 108.3� � Electrical Square Footage � Detailed Scope and Location of Work: Applicant Name: Gs�.,/iL(/�C.� �fl`'�i�'l�r,',T"- ���T�� ,��%jry1.,��- t'�i',4.i� Applicant Phone: ��) 1f�' .�/"o ��' /7� �s,,y21 L,f�' �rG� GiIJP..� �fl-i.ur Applicant E-MaiL �',c,{.1.� ��' SCi��ci'u.c�T�� GE�ST?�+�liL` �'' —� �f}i�C�/.�!/f'7`o �Ll�?'%P/ .il/�y ��-yl/S ` <L'11.j Project Informatio Owner Name: ���fi"E �fi'f���T; Sl1ti Parcel #: �l� % i - /023 �" G�`t` - C�'�� � (For Parcel #, contact Eagle County Assessors Office at (970-328-8640 or visit www.eag lecounty. uslpatie) For Office Use Only: Fee Paid: � � �'� Received From: S l�Qv�% Or��3�,(�c.�c'�-v�ry� Cash Check # 1 l'�Z CC: Visa / MC Last 4 CC # exp date: Auth # (use additional sheet if necessary) Date Received: D � ( (�'� � � � � U � JUN252012 �/iq i�Al� � � � �.��� TOWN OF VAIL � 12-Mar-2012 ********************+++++*+**************************�****************+**********+++�+****** TOWN OF VAIL, COLORADOCopy Reprinted on 06-26-2012 at 15:05:36 06/26/2012 Statement ****�+**********�**************************************�*****+**++***********************�*� Statement Number: Amount: $785.76 06/26/201202:55 PM Payment Method: Check Init: LC Notation: #1172 SKI COUNTRY CONSTRUCTION INC ----------------------------------------------------------------------------- Permit No: B12-0260 Type: COMBINATION BLDG PERMIT Parcel No: 2101-123-0400-2 Site Address: 4506 SPRUCE WY VAIL Location: Ridgeview Square Unit 2 Total Fees: $808.86 This Payment: $785.76 Total ALL Pmts: $785.76 Balance: $23.10 ********�*******************+��*****************�******************************************* ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ BP 00100003111100 BUILDING PERMIT FEES 326.15 PF 00100003112300 PLAN CHECK FEES 227.01 UT 11000003106000 USE TAX 4�S 227.60 WC 00100003112800 WILL CALL INSPECTION FEE 5.00 ----------------------------------------------------------------------------- � . s ■�; � PO Box 9 Frisco, CO 80443 970-668-9969 Department of Community Development 75 South Frontage Road Vail, CO 81657 Re: 4506 Spruce Way Apt 2 � ���o�c� '� JUN 2 5 2012 ; 1/� �- �1 TOWN OF VAIL To whom it may concern: Please find a detailed scope of work to be completed, floor plan sketches, building permit application as well as fee for water damage repair work at 4506 Spruce Way Apt 2. ServPro of Summit, Lake, Park and Eagle County performed all water mitigation work and demo at this residence. An asbestos test was performed and all necessary precautions were taken in order to remove compromised materials. Please find all asbestos testing reports and clearance results attached. Permit Fee Detail: Town of Vail Permit Fee Detial Buildin� Permit Fee Total Valuation of Work $21,380.00 $69.25 For First $2000 69.25 $14 For Additional $19,000 266 Total Permit Fee $ 335.25 Plan Review Fee $335.25 x 65% $ 217.91 Construction Use Tax (($21380-$10000)/2)*.04 $ 227.60 Will Call Inspection Fee $ 5.00 Total Permit Fee Due $ 785.76 Please contact me with any questions Best Regards Kenny Thaemert Ski Country Construction (970) 485-2629 �� � � �n� JUN 2 � 7U1`l� ��` pWN OF VAIL Vail Fire Department Asbestos Testing & Abatement Requirements Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex- posure to harmful asbestos. The Town of Vail asbestos abatement program is in addition to the State of Colorado's regu- lations. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements at the contact info listed below. When is asbestos testing required? ANY building projects disturbing more than these threshold levels of building materials require asbestos testing: One- and Two-Family Dwellings: 32 square feet All Others (commercial spaces, hotel rooms, etc): 160 square feet Definition of a single-family dwelling: any dwelling unit that is used primarily for a single family, including multi-family/condominium units, and fractional fee units. Asbestos testing results must be provided with your application for a building permit. Tests which identify POSITIVE results at more than 1% require abatement by a State-certified and Vail-registered abate- ment contractor. An asbestos abatement permit must be approved, and the clearance letter must be submitted to the Town of Vail before the building permit will be issued. Project Checklist My project falls into the category checked below: � Will not disturb more than the threshold limits identified above. � Tested negative, or at 1% or below (1 copies of test results included) � Tested positive at more than 1%, requires abatement (1 copies of test results included) Tips & Facts: • Even recent construction projects may include asbestos-containing materials, so buildings of � age require testing. • The "1989 Ban" on asbestos-containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit Court of Appeals vacated much of the so-called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce of many asbestos-containing product categories was set aside and did not take effect." - CDPHE Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development, 75 S Frontage Rd, Vail, CO, 81657. Town of Vail Contact: Fire Prevention Bureau Vail Fire Department 75 S Frontage Rd Fire_inspec±ors@vailgov.com 970-479-2252 www.vailgov.com State of Colorado Contact: Colorado Department of Public Health and Environment Asbestos Compliance Assistance Group 303-692-3158 a sbestos @state. co. us www. cd phe. state. co. us 15-May-10 ■ onsu n Asbestos Inspection and Sampling Report 4506 Spruce Way, Unit 2, Vail, Colorado 81657 Presented To: Ms. Carolanne Basile SERVPRO of Summit, Lake, Park & Eagle Counties PO Box 9 Frisco, CO 80443 Performed & Prepared By: Ms. Edie Stevenson DS Consulting, Inc. PO Box 6864 Avon,CO 81620 (720) 480-2963 Project Details: Project Number: 84 Conducted: May , 012 TABLE OF CONTENTS PROJECT OVERVIEW 1.0 Introduction 2.0 Scope of Work 3.0 Site Description 4.0 Certifications 5.0 Inspection, Sampling & Analytical Procedures 5.1 Inspection Procedures 5.2 Sampling Procedures 5.3 Analytical Procedures 6.0 Homogeneous Areas 6.1 Material Friability 6.2 Material Classifications 6.3 Material Conditions 6.4 Sample Quantities 7.0 Overview of Findings 8.0 Conclusion & Recommendations 9.0 Asbestos Abatement & Demolition Requirements 10.0 Major Asbestos Spill Response 11.0 Disclaimer & Limitations APPENDIX A Inspector & Firm Asbestos Certificates APPENDIX B Analytical Data 2 PROJECT OVERVIEW 1.0 Introduction DS Consulting, Inc. (DSC) conducted a limited asbestos inspection and collected asbestos bulk-samples of suspect asbestos-containing materials (ACM) within the residence located at 4506 Spruce Way, Unit 2, Vail, Colorado. The purpose of the limited inspection was to identify and sample potentially hazardous friable and non- friable ACM that may be impacted by upcoming restoration activities. 2.0 Scope of Work The scope of the limited inspection and bulk-sampling was limited to the walls on all three levels of the town home as well as the ceiling of the lowest level. The remaining areas within the residence, garage or any out-building on the property were not included in the scope of the inspection. The limited asbestos inspection did not constitute a full building inspection and does not fulfill the asbestos inspection requirements for structures that are to be demolished. 3.0 Site Description The residence is a wood-framed, three-level, single-family residence in a multi-unit building. 4.0 Certifications The limited asbestos inspection and bulk-sampling was conducted by Ms. Edie Stevenson with DSC. DSC is a Colorado Department of Public Health and Environment (CDPHE) certified Asbestos Consulting Firm, Registration No. 14912. Ms. Stevenson is a CDPHE certified Building Inspector; having certification number 18406 (seeAppendixA forcertificates). 5.0 Inspection, Sampling & Analytical Procedures 5.1 Inspection Procedures The limited asbestos inspection was conducted by an Environmental Protection Agency (EPA) and CDPHE certified Building Inspector. The inspection procedures included identifying and sampling suspect ACM within the pre-defined areas, submitting samples to an accredited laboratory for analysis, classifying the materials and assessing their condition, and compiling a final report detailing the inspection and the analytical results of the bulk-samples. 5.2 Sampling Procedures Statistically random bulk-samples representative of the suspect ACM of each homogeneous area were collected according to the guidelines published as EPA Final Rule: Title II of the Toxic Substances Control Act (TSCA), 15 USC, Sections 2641 through 2654 and in compliance with 40 CFR, Part 763 and CDPHE Regulation Number 8, Part B- Asbestos (Reg. 8). DSC has collected the appropriate number of bulk-samples to meet all regulatory requirements for the classification and quantity of each homogeneous area. Some minor destructive sampling was conducted; however, walls, columns and perimeter pipe chases were not broken into in order to locate 3 and quantify suspect ACM. It should be noted that additional ACM might be located in these and other inaccessible areas. Materials containing less than 1% asbestos are not regulated by CDPHE Regulation 8, Part B- Asbestos. However, all demolition/abatement activities should be performed following the applicable Occupational Safety and Health Administration (OSHA) regulations. This would include, but not limited to, the appropriate asbestos training for the type of material being removed/disturbed as well as having a properly trained supervisor onsite, using wet removal methods, wearing adequate personal protective equipment (HEPA-filtered particulate respirators), medical surveillance of workers, personal-exposure air monitoring, area air monitoring in occupied buildings, etc. There may also be landfill disposal requirements for these materials, depending on the facility. DSC recommends that all demolition/renovation areas involving any amount of asbestos be subjected to visual inspections and a final clearance air testing by a CDPHE-certified Air Monitoring Specialist (AMS) after the work has been completed, but before any containments are dismantled and the area is reoccupied. 5.3 Analytical Procedures All asbestos bulk-samples were analyzed by a National Voluntary Laboratory Accreditation Program (NVLAP) accredited laboratory via Polarized Light Microscopy (PLM) for asbestos content (see Appendix B for laboratory report). The percentage of asbestos within each individual bulk-sample can vary depending on sample location, homogeneity of the material, and the type of application. Any sample reporting a"TRACE" amount of asbestos must be considered positive for asbestos greater than 1% unless it is re-analyzed utilizing the point-count method and verified to be less than 1%. 6.0 Homogeneous Areas A Homogeneous Area (HA) includes materials that are uniform in appearance, color, texture and date of application. The asbestos content of the bulk-samples collected within a homogeneous area can be applied to the entire homogenous area if they conform to the above characteristics and the regulated minimum sample quantities of each type of material are collected and analyzed. 6.1 Material Friability A material can either be friable or non friable. A friable material is one that, when dry, can be pulverized, or reduced to powder by hand pressure, a non-friable material cannot. A non-friable material may become friable if its condition had deteriorated or has been impacted by forces that have rendered it friable. 6.2 Material Classifications Sampled materials are divided into one of the following three categories: • Surfacing Material: sprayed or troweled onto structural building members • Thermal System Insulation (TSI): any type of pipe, boiler, tank, or duct insulation • Miscellaneous Material: all other materials not classified in the above two categories 6.3 Material Conditions Sampled materials are placed into one of the three following categories of conditions: • Good: none to very little visible damage or deterioration 4 • Damaged: the surface is crumbling, blistered, water-stained, gouged, marred or otherwise abraded over less than one-tenth of the surface if the damage is evenly distributed, or one-quarter if the damage is localized • Significantly Damaged: the surface is crumbling, blistered, water-stained, gouged, marred or otherwise abraded over greater than one-tenth of the surface if the damage is evenly distributed, or one-quarter if the damage is localized 6.4 Sample Quantities DSC collected at least the minimum number of samples from each homogeneous area necessary to meet all regulatory requirements for the quantity of material to be disturbed. The quantities listed in this report are approximate and on-site verification of the exact quantity of each material is required. The following outlines the minimum sample quantities required per homogeneous area: • Surfacing Materials: up to 1,000 ft2 of material requires a minimum of three (3) samples; between 1,000 ftz and 5,000 ft2 of material requires a minimum of five (5) samples; over 5,000 ftz of material requires a minimum of seven (7) samples; one (1) sample of each patch • Thermal System insulation (TSI): each homogeneous area requires a minimum of three (3) samples; at least one (1) sample must be collected from each patch; and collect enough samples sufficient to adequately assess the material and determine the asbestos content for TSI fittings such as pipe elbows or T's. • Miscellaneous Materials: collect enough samples sufficient to determine the asbestos content 7.0 Overview of Findings Asbestos was reported within all of the drywall surfacing texture within the main and attic/loft level of the residence. The drywall wall and ceiling surfacing texture within the lower level was none-detect for asbestos. DSC collected a total of thirteen (13) asbestos bulk-samples of three (3) homogeneous areas. Table 1 below describes the materials composing each homogeneous area as well as the locations of each bulk-sample collected. Also listed is the classification, condition, friability and estimated quantity of material to be removed and/or disturbed, as well as the asbestos content within each bulk-sample. Please see Appendix B: Analytical Data for the layer break-down of each bulk-sample. E TABLE 1 HA Sample Material Sample Material Material Estimated Material Asbestos # ID Description Location Classifrcation Condition Quantity Friability Content UW1-1 Attic/Loft, North Wall SM G �800 ft� Friable 3�% CHRY 1 DW1-2 Tan, Orange Peel Drywall Main Level Hall, South Wall SM G �800 ftz Friable 2% CHRY Surfacing Material DW1-3 Main Level, SE Corner above SM G �800 ft2 Friable 3% CHRY Door DW2-1 Lower Level, North Wall at SM G �400 ftz Friable ND Joint DW2-2 Lower Level, North Wall SM G �400 ft2 Friable ND Center Tan, Orange Peel Drywall Lower Level, North Wall Z DW2-3 Surfacing Material Center SM G �400 ftz Friable ND DW1-1 Lower Level Interior Wall SM G �400 ftz Friable ND DW1-2 Lower Level Interior Wall SM G �400 ftz Friable ND DW1-3 Lower Level Interior Wall SM G �400 ftz Friable ND SMC1-1 Lower Level Ceiling SM G �100 ftz Friable ND SMC1-2 Lower Level Ceiling SM G �100 ftz Friable ND 3 Tan, Rough Drywall Texture SMC1-3 Lower Level Ceiling SM G �100 ftz Friable ND MM1 Lower Level Ceiling SM G �100 ftz Friable ND HA - Homogeneous Area G- Good CHRY - Chrysotile SM - Surfacing Material ND - None-detect D- Damaged ACT - Actinolite MM - Miscellaneous Material TR - Trace, <1% Visual Estimate SD - Significantly Damaged TSI - Thermal System Insulation 8.0 Conclusion & Recommendations ACM was identified within the drywall surfacing texture of the main level and attic/loft level of the town home that were within the scope of the limited inspection and bulk-sampling performed on May 18, 2012; therefore, professional abatement activities are required to remove or disturb this asbestos-containing material. 9.0 Asbestos Abatement & Demolition Requirements If ACM is to be removed or disturbed in a single-family residence, and the total quantity exceeds any of the regulatory trigger levels of 501inear ft. on pipes, 32 ftz on other surfaces, or the volume equivalent of a 55-gallon drum, a CDPHE-certified General Abatement Contractor (GAC) is required to perform the work. The regulatory trigger levels within a commercial building are 260 linear ft. on pipes, 160 ft2 on other surfaces, or the volume equivalent of a 55-gallon drum. In addition, formal notification to CDPHE prior to the abatement of ACM as well as air monitoring, visual inspections, and final air clearances by a CDPHE-certified Asbestos AMS is required. DSC can provide the client or building owner with a proposal for project design, abatement oversight and air monitoring upon request. CDPHE regulations allow for the demolition of a building that contains non-friable asbestos-containing materials, such as caulking, mastic or resilient floor tiles. However, demolition must be completed without causing the non-friable ACM to be rendered friable. Burning a building with any ACM is prohibited. Operations such as sanding, cutting, crushing, grinding, pneumatic jacking, etc. of ACM are not permitted. Recycling of building materials such as concrete, metal, or wood that are bonded or contaminated with ACM, e.g. glue, caulking, or mastic is also prohibited. If any of the non-friable asbestos containing materials are to be recycled and rendered friable after demolition (i.e. crushing mastic-coated concrete), these materials must be abated of all ACM prior to shipping offsite for recycling. OSHA regulations regarding occupational exposure during demolition activities is still mandatory. OSHA 29 CFR 1926.1101 requires that workers performing construction-related activities be protected from asbestos fibers in excess of the permissible exposure limit of 0.1 f/cc of air. Contractors are must comply with applicable provisions of OSHA 29 CFR 1926.1101 during demolition and renovation activities. These OSHA provisions include, but are not limited to, PPE and respirators, personnel training, personal- exposure air monitoring, employee medical surveillance, wet removal methods, signage for regulated areas, etc. 10.0 Major Asbestos Spill Response If ACM is significantly damaged and the total quantity exceeds the regulatory trigger levels, the area is deemed a"Major Asbestos Spill." The area is consequently subject to the requirements in Reg. 8, Section III.T.1. - Major Asbestos Spills, as outlined below. Additional asbestos air or dust sampling should also be conducted within the remaining areas not directly impacted by the Major Asbestos Spill to determine if asbestos-containing dust/debris has spread to adjacent areas. If asbestos fibers are found within any other areas or on building contents, they should be included in the scope of professional abatement and decontamination. The following response actions must be followed per Colorado Reg. 8 when a Major Asbestos Spill occurs: • Restrict access to the area and post warning signs to prevent entry to the area by persons other than those necessary to respond to the incident. • Shut off or temporarily modify the air handling system to prevent the distribution of asbestos fibers to other areas. • Immediately contact the Division by telephone, submit a notification in compliance with subsection III.E. (Notifications) and, if in an area of public access, apply for a permit in accordance with subsection III.G. (Permits). • Be exempted from the requirements to have a certified Supervisor on-site at all times, until such time as the immediate danger has passed. Any cleanup or asbestos abatement that must occur after the immediate danger has passed shall be supervised by a person certified by the Division. • Using certified Supervisors and certified Workers in accordance with section II. (Certification Requirements) of this Regulation, seal all openings between the contaminated and uncontaminated areas and establish none-detect air pressure within the contaminated area in accordance with paragraph III.J. (Air Cleaning and None-detect Pressure Requirements). This is to be accomplished using polyethylene sheeting to cover areas such as doorways, windows, elevator openings, corridor entrances, grills, drains, grates, diffusers and skylights. • HEPA vacuum or steam clean all carpets, drapes, upholstery, and other non-clothing fabrics in the contaminated area, or discard these materials. • Launder or discard contaminated clothing in accordance with subsection III.R. (Waste Handling). • HEPA vacuum or wet clean all surfaces in the contaminated area. • Discard all materials in accordance with subsection III.R. (Waste Handling). • Following completion of subparagraph III.T.1.a. through III.T.1.i. above, comply with air monitoring requirements as described in subsection III.P. (Clearing Abatement Projects); air samples shall be collected aggressively as described in 40 C.F.R. Part 763, Appendix A to Subpart E(EPA 1995), except that the air stream of the leaf blower shall not be directed at any friable ACM that remains in the area and • Comply with any other measures deemed necessary by the Division to protect public health. 11.0 Disclaimer & Limitations The activities outlined in this report were conducted in a manner consistent with a level of care and expertise exercised by members of the environmental consulting and industrial hygiene profession. All activities were performed in accordance with all applicable federal, state, and local regulations as well as generally accepted standards and professional practice. No warranty is either expressed or implied. DSC assumes no responsibility or liability for error in public information utilized, statements from sources other than DSC, or developments resulting from situations outside the scope of this project. The details provided within this report outline the inspection activities on the date(s) indicated and should not be relied upon to represent conditions at a later date, the limited number of bulk-samples collected, and the laboratory results of those bulk-samples. The laboratory results contained in this report apply specifically to the materials in which bulk-samples were collected. The results do not include or apply to any other materials within the structure that were not sampled, but may contain asbestos; including materials that may be hidden or inaccessible. Additional inspection and bulk- sampling activities would be required to determine if any other materials contain asbestos. This report has been prepared on behalf of and exclusively for use by the Client, with speci�c application to their project as discussed in the scope of work. The results of any surfacing material indicated in this report also includes any associated overspray of that material, e.g., under carpet, above suspended ceilings, etc. The information contained in this report is intended as supplementary material for abatement design and is not to be used as the scope of work for abatement activities, bidding or billing purposes. Contractors or consultants reviewing this report must draw their own conclusions regarding 8 further investigation or remediation deemed necessary. DSC can provide a full scope of work for abatement upon request. DSC does not warrant the work of regulatory agencies, laboratories or other third parties supplying information which may have been used in the preparation of this report. 0 APPENDIX A INSPECTOR & FIRM ASBESTOS CERTIFICATES � ,...,:•e r,'�.o.:`?z.: �rr:,xC•5�� ..w��i;�'�i�'.f ..._...��.r`+`�.---- r.�..a,.. .....:;,�:`�r..... _.. �� ��, �� -"M'qa,•-,}�'tly.<<3"" 't�7.yG'-?a_.=- --�-.,�.`F _-' ' �� � � _ � . y. _'. � �. � ,. . ..-- . . "'•,.... ... - � : .' . , . ��� ��v STATE OF COLORADO ,¢ �r� as�sTOs ��� � � ��� �:�,,�- � �* C�R7.7FICATIO G�,,,�.. � `� . ��'f,'��- . °�,�, �- � Colpratlo Departr»ecR of Public'Heait6 �' �.-� and Favirotvnent `;: ,�� . , �'�• Air Pollution Control Division J� � k ; F ��. ti��� _ �* �- f �� f �; 'x+rF fif This certifies thaz "'+�,� r �i; � � � . � � Edie Stevenson � : v : ;. � � ; ' , t `�`�' t�� -�,� , � Certifieatioa Na�18�106 �� ?o " ' •.,':: �'��.'` � has met the requirements of 25-7-507, C.R.S. and Air Quality Control � Commission Regulation No:'8, Part B, and is hereby certified by We �, state of Colorado in the following disciptine: r''� � � , � �_ � ���� ` � Buj�diag iaspe�tor*.,�: , •� � t�� Issaed: 6f17R011 ,.� ��; r, . ��l � Eipiret oo: 6l17r1612 � - - ;��� � �`��-� s °t. : 4�u'-'.' � ,_ i�_.� � {�a � '1%VO/�dblfl�%MId�Yff//�I�i/II�f����A\/I�%Y(OI�! � ie�fwbWi��F�.r�e1�4/W'e ,�v�`�� � .. , .� _ �N .. �i�i ` ,... � .. �. . _ ; ♦ ' r--�'��='u•'�py'w'b_' '."'}n: "..' ��.....:-.a. ��i_'i-_c..y ..u�. ,. �'SB.��-�f .fF 91�. . ..JY ��1... .1P i_ .. � . Y �, � ._:.vF�, .. �,s,:�a+a�'. �. :-,,�ny.+J,.. �.` STATE OF COLORADO ASBESTOS CONSULTING FIRM Coloredo Depxrtmrnt of Pubtic Health mtd E:nvirpnmrnt Air PoHution Comrol Uivision ��f � �� '. '� �i � This cMefies [hat � � �. � �� � 4 -�� ? DS ConsulNng, Inc. �` Rq�isstratioo l�o. ACF - 1 �912 . ,;,,: regi�traci�n rcqwrcmcpts of 25-1.507, C.It.S. and the Air-Quslity Coatrol �.,���nu..,�on Regulatioat!��- & Prrt l3, md is herCby aWborized to pe{furn� ssbeatas coasniting �ct�vities asieq d yadEr:Regulstws#a E ParCE,$,� in:ike�state;6f Colorado. � � �— � . . , ' 1 � . � . r f, i . . �i lanusty 30 20T2 _ �—"",/ �y.�"/� ���,,,///��� .�._ . �(f' y/i�`�$�y/. � Y,.([[[r/.� � . 1�?:f'c'� �3li:i:1`� . �(�'� : Y% _j (.�� � .. ..0 1Ls ` i � � '�'�� .. f� . �111M�MM�CG�iw�Y+1/n �.. , i _ a�un. _�-� , � APPENDIX B .�. � . �. . . , ._ . . 12 AFRi7I71(7IlAC"�y LAtK)RATOR)/ .�tiS(X_:IATFS, INC:<>17N()F2AtH� � C�e� Certi�cate of Analysis 13949 W, Colfax Ave Suite 205 Lakewood, CO 80401 303.232.3746 www.aerobiolo9Y net Client Name DS Consulting �����so Date Collected: OS/18/12 Street address 5366 Flatrock Ct � Date Received: OS/18/12 Ciry, State ZIP Morrison, CO R0465 Date Analyzed: OS/23/12 Attn: I:die Stevenson & Ste�e ShurtlitT NvLnP Lab Code 200860-o Date Reported: OS/24/12 Client Project Name: 450 d 2 Spiuce Way, Vail Project ID: 12005719 Job ID: Amended Report Test Requested: 3002, Asbestos in Bulk Samples Method: Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA-600/R-93/116, July 1993. Sample Identification Homo- Layer Non-Asbestos Non-Fibrous Matrix Physical Description of Sample/Layer geneous Asbestos Detected Asbestos Percentage Fiber Material Material Client Lab Sam le Number �y�,� Percentage Percenta e Percenta e Com osition 12005719-1A White Texture w/Pink Paint N 15% CHRY 3 5 92 C DW 1-1 1200�719-1B Tan/White Drywall N 8�% ND 10 90 G 12005719-2A w'hite Texture w/Pink Paint N 15% CHRY 2 8 90 C DW 1-2 12005719-2B Tan/White Drywall N 8�% ND 10 90 G 12005719-3A White Texture w/I'ink Paint N 25% CHRY 3 3 94 C DWl-3 12005719-3B I'an/White Drywall N 7�% ND 10 90 G 12005719-4A White Compound N 25% ND 2 98 C DW2-1 12005719-4B White Compound N 35% ND 2 98 C 12005719-4C White Tape N 40% ND 99 1 DW2-2 12005719-5 Tan/White Drywall w/White Paint N 100% ND 10 90 C �� ��ia?��_ 0� R�c ard Wegrzyn I.aboratory Analyst Page 1 of 3 A = Amosite AC = Actinolite �// AN = Anthophyllite /�'�°�� CHRY=Chrysotile CR = Crocidolite TR = Tremolite Paul Knappe Trace=Less Than 1% Asbestos Laboratory Supervisor ND=None Detected 13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.2323746 Q = Quartz P = Perlite C = Carbonates B = Binder G = Gypsum D=Diatoms M = Mica T=Tar NTR = Non-Asbestiform TR NAC = Non-Asbestiform AC f�FRCAh1AI(7C��/ LAI7CIRATC7Ry A'iS( x:L41 t4. INt.:( N2N(. )I?Ai t=� ) 3�s�-+�F C.M�iwsG Certificate of Analysis 13949 W, Colfax Ave Snite 205 Lakewood, CO 80401 3032323746 www.aerobiolo9Y net Client Name DS Consul[ing ������o Date Collected: OS/18/12 Street address 5366 Flatrock Ct � Date Received: OS/18/12 City, State ZIP Morrison, CO 80�65 Date Analyzed: OS/23/12 Attn: Edie Stevenson & Steve Shurdiff NVLAP Lab Code 2o08GO-o Date Reported OS/24/12 Client Project Name: �50 N2 Spruce Way, Vail Project ID: 12005719 Job ID: Amended Report Test Reqoested: 3002, Asbestos in Bulk Samples Method� Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA-600/R-93/ll6, July 1993. Sample Identification Homo- Layer Non-Asbestos Non-Fibrous Matrix Physical Description of Sample/Layer geneous Asbestos Detected Asbestos Percentage Fiber Material Material Client Lab Sam le Number �Y�N� Percentage Percenta e Percenta e Com osition 12005719-6A Tan Wall Covering N 4% ND 50 50 DW2-3 12005719-6B White/Tan l�rvwall w/White Paint N 96% ND l� 85 G ����,��� R�chard Wegrzyn Labora[ory Analys[ Page 2 of 3 A = Amosite AC = Actinolite ���/�`"—"d'/ AN = Anthophyllite CHRY=Chrysotile CR = Crocidolite TR = Tremolite Pau Knappe Trace=Less Than 1% Asbestos Laboratory Supervisor ND=None Detected 13949 W. Colfar Ave. Suite 205, Lakewood CO 80401, 3032323746 Q = Quartz P = Perlite C = Carbonates B = Binder G = Gypsum D=Diatoms M = Mica T=Tar NTR = Non-Asbestiform TR NAC = Non-Asbestif'orm AC � Ac�zobioloc�y l.�abo�aro�zy ASS()C.;IAIES, INLUI2F'L)!?AlE[� �YOLNf �lsif Certificate of Analysis Client Name DS Constdting �� Street address S;GG Fiatrock Ct ���Q� City, State ZIP Morrison, CO 8046� Attn: Steve Shurtliff & Fdie Stevenson NVLAP Lab Code 200860-0 Client Project Name: 4506 #2 Spn�ce Way Test Requested 3002, Asbestos in Bulk Samples Method: Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA-600/R-93/116, July 1993. 13949 W. Colfax Ave Suite 205 Lakewood, CO 80401. 3032323746 www aerobioloav.net Date Collected: OS/24/12 Date Received: OS/25/12 Date Analyzed: OS/25/12 Date Reported: OS/25/12 Project ID: 12006001 Job ID: Sample Identification Homo- Layer Non-Asbestos Non-Fibrous Matrix Physical Description of Sample/Layer geneous percentage Asbestos Detected Asbestos Percentage Fiber Material Material Client Lab Sam le Number Y/N Percenta e Percenta e Com osition 12006001-1A White Compound N 5% NU 100 C DWl-1 12006001-1B Tan/White Drywall N 10°/o ND 10 90 G 12006001-1C Beige Wall Covering N 85% ND 50 50 12006001-2A 7an/White Drywall N 5% ND 50 50 DWI-2 12006001-2B White Compound N 5% ND 100 C 12006001-2C Beige Wall Covering N 90% ND 50 50 G 12006001-3A Tan/White Drywall w/White Paint N 50% ND 50 50 G DW 1-3 ]2006001-3B Beige Wall Covering N �0% ND 50 50 MM1 12006001-4 White Texture w/White Paint N ]00% ND l00 C A = Amosite AC = Actinolite �� C�'�_ _ _� ���/���� AN = Anthophyllite � � 1 CHRY=Chrysotile CR = Croc�dolite TR = Tremolite ic ar egrzyn au nappe Trace=Less Than 1% Laboratoty Analyst Asbestos Laboratory Supervisor ND=None Detected 13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.232.3746 Page 1 of 2 Q = Quartz P = Perlite C = Carbonates B = Binder G = Gypsum D=Diatoms M = Mica T=Tar NTR = Non-Asbestiform TR NAC = Non-Asbestiform AC AFRA�7►1<?I(7C'�y LA�70RATOfY)/ AtiSt X.:L4TFS. INC :<7liN()!?A.iF�� � C.�sb Certificate of Analysis Client Name DS Consultm@ ��n � ^�o Street address 5366 Flatrock Ct � ��J City, State ZiP Murrisoq CO 80465 U Attn: Sle��e ShUrtliff NVLAP Lab Code 2008G0-0 Client Project Name: 4506 Spruce Way, Unit 2, Vail, CO Test Reques�ed: 3002, Asbestos in Bulk Samples Method Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA-600/R-93/116, July 1993. 13949 W. Colfax Ave Suite 205 Lakewood, CO 80401 303.2323746 www.aerobio�gqv net Date Collected: OS/24/12 Date Received: OS/29/12 Date Analyzed: OS/29/12 Date Reported: OS/29/12 Project ID: 12006068 Job ID: Homo- Non-Asbestos Non-Fibrous Matrix Sample Identification Layer Physical Description of Sample/Layer geneous Asbesros Detected Asbestos Percentage Fiber Material Material Client Lab Sam le Number ��,�N� Percentage Percenta e Percenta e Com osition 12006068-1A White Tapc N 30% ND 95 � SMCI-1 12006068-1B White Texture w/Cream Paint N 30% ND 100 C 12006068-1C White Joint Compound N 40% ND l00 C 12006068-2A White Tape N 30% ND 95 � SMCI-2 12006068-2B White Texture w/Cream Paint N 30% ND 100 C 12006068-2C White Joint Compound N 40% ND ] 00 C 12006068-3A White Tape N 30% ND 95 � SMC1-3 12006068-3B White Texture �v/Cream Paint N 30% ND 100 C 12006068-3C White Joint Compound N 40% ND l00 C A = Amosite AC = Actinolite /�� C�'a_ _ _� ���/�/� AN = Anthophyllite �f ��1 �---��i CHRY=Chrysotile � � (/ � CR = Crocidolite TR = Tremolite Richard Wegrryn Paul Knappe Trace=Less Than 1% Laboratory Analyst Asbestos Laboratory Supervisor ND=None Detected Page 1 of 2 13949 W. Colfa�c Ave. Suite 205, Lakewood CO 80401, 3032323746 Q = Quartz P = Perlite C = Carbonates B = Binder G = Gypsum U=Diatoms M = Mica T=Tar NTR = Non-Asbestiform TR NAC = Non-Asbestiform AC DS Consulting, Inc. Final Clearance Air Monitoring Report 4506 Spruce Way, Unit #2, Vail, Colorado Presented To: Mr. Scott Tash Mr. Wes Worley ALM Environmental Services 7763 Webster Way Arvada, CO 80003 Performed & Prepared By: Mr. David Sinkbeil DS Consulting, Inc. 5366 Flatrock Crt. Morrison, CO 80465 (720) 201-6611 Project Details: DSC Project Number: 897 Conducted: May 30, 2 EXECUTIVE SUMMARY On May 30, 2012, Mr. David Sinkbeil with DS Consulting, Inc. (DSC) conducted a final visual inspection, performed aggressive clearance air monitoring, and analyzed clearance air-quality samples via Phase Contrast Microscopy (PCM) for an asbestos abatement project within the single-family condominium residence located at 4506 Spruce Way, Unit #2, Vail, Colorado. Services were provided at the request of Mr. Scott Tash with ALM Environmental, Inc. in support of asbestos abatement activities being conducted to remove approximately 170 square feet of friable drywall/texture (surfacing materials) from the 2nd level and loft containment area. This project was a homeowner opt-out abatement project. Mr. Sinkbeil performed a final visual inspection along with aggressive clearance air monitoring and analyzed five (5) clearance air-quality samples via Phase Contrast Microscopy (PCM) from a full containment encompassing the abatement area on May 30, 2012. Monitoring locations and frequencies were determined by Mr. Sinkbeil having EPA and State of Colorado accreditation No. 13015. PCM analysis was also performed by Mr. Sinkbeil (see Appendix B for certification). DSC's scope of work for this project included performing a final visual inspection and collection and analysis of aggressive final air quality samples by NIOSH 582-trained personnel for determination of airborne asbestos (as total fibers) concentrations in identified areas. DSC is a participant in the Industrial Hygiene Proficiency Analytical Testing (IHPAT) program with laboratory ID No. 188987 and has a rating of Proficient. The abatement project passed the final visual inspection and the analytical results of all five (5) PCM samples collected were below the clearance criteria of 0.01 fibers/cubic centimeter (f/cc) (see Appendix A forAir Sam ple Analysis). PROJECT INFORMATION • General Abatement Contractor (GAC) ALM Environmental, Inc. • GAC Project Supervisor Mr. Anthony Arellano • Project Location 4506 Spruce Way, Unit #2 Vail, CO � Project Contact Mr. Scott Tash 2 � Air Monitoring Specialist/Analyst Mr. David Sinkbeil • Date Conducted May 30, 2012 • Final Clearance Sample Results See Appendix A • Certifications See Appendix B PROJECT INTRODUCTION On May 30, 2012, Mr. David Sinkbeil with DS Consulting, Inc. (DSC) conducted a final visual inspection, performed aggressive clearance air monitoring, and analyzed clearance air-quality samples via Phase Contrast Microscopy (PCM) for an asbestos abatement project within the upper level and loft level of the single-family condominium residence located at 4506 Spruce Way, Unit #2, Vail, Colorado. Services were provided at the request of Mr. Scott Tash with ALM Environmental, Inc. in support of asbestos abatement activities being conducted to remove approximately 170 square feet of friable drywall/texture (surfacing materials) from the 2nd level and loft containment area. This project was a homeowner opt-out abatement project. Mr. Sinkbeil performed a final visual inspection along with aggressive clearance air monitoring and analyzed five (5) clearance air-quality samples via Phase Contrast Microscopy (PCM) from a containment encompassing the abatement area referenced above on September 30, 2011. Monitoring locations and frequencies were determined by Mr. David Sinkbeil; having EPA and State of Colorado accreditation No. 13015. PCM analysis was also performed by Mr. Sinkbeil (see Appendix B for certifications). SCOPE OF WORK DSC's scope of work for this project included performing a final visual inspection and collection and analysis of aggressive final air quality samples by NIOSH 582-trained personnel for determination of airborne asbestos (as total fibers) concentrations in identified areas. DSC is a participant in the Industrial Hygiene Proficiency Analytical Testing (IHPAT) program with laboratory ID No. 188987 and has a rating of Proficient. The abatement project passed the final visual inspection and the analytical results of all 5 PCM samples collected were below the clearance criteria of 0.01 fibers/cubic centimeter (f/cc) (see Appendix A forAir Sam ple Analysis). AIR MONITORING Air-quality samples were collected utilizing a modified NIOSH 7400 Method, whereby samples were collected on 25-millimeter (mm) mixed-cellulose, ester-membrane filters with 0.45-micron pore size and analyzed via Phase Contrast Microscopy (PCM) as per the customer's requirements. Sample Collection - PCM samples, when applicable, were collected on 25-millimeter (mm) mixed- cellulose, ester-membrane filters with 0.45-micron pore size with an effective collection area of 385 mm. All filters were pre-assembled by the manufacturer in three stages, conductive sampling cassettes with extension cowls. Air samples were collected at an average flow rate 12.5 liters per minute (L/m) using Thomas high- volume pumps with a minimum of 1,200 liters being collected. Flow rates were collected at the beginning and at the end of the sampling period utilizing an airflow rotameter calibrated against a primary-flow calibration instrument. Start times and stop times were recorded for all sampling periods. A field blank and lab blank were also collected and analyzed along with the five (5) clearance samples. PCM Sample Analysis Method - PCM samples were analyzed according to a modified NIOSH 7400 Method—A Counting Rules—although samples were collected on 25-mm mixed-cellulose, ester- membrane filters with 0.45-micron pore size and analyzed via PCM. Air sample results contained in this report have been calculated with blank sample corrections. 3 APPENDIX A- AIR SAMPLE RESULTS BRL = Below Reporting Limit of 0.002F/cc ND=None Detected APPENDIX B CERTIFICATIONS F � G �� V y i ^o .��m `ey�d �$ �" � ae0 e� � ��� � �"� �C� � _ u �' i 3�� � Z � ��; o, z s� w .� . �� ��� � ���� 0 ���� STATE OF COLORADO ASBES"FUS '� ��" � ..� CERTIFICATiO�i* '.� � � '� � ,Colorado (kp9nimm of k'ubiic HadW . �! 7� � uid Fnvironmcnt i� .�„�, . �� •.. .� Air PollutionCmant Diwim `r � a sJ.J � ,«.'��,' . '�j '�.. °`+{ �: � This ccrtities `hat t„/ ` , -,� r David Slnkbeii i: �+•# �� ' �z.. Ccrlifleafion No: t301S � ^�, . t �: ' ha met the requircmmmtx of 25-7•Str7. C.Ri. snd Aic Qu�liry ConVql ��. ,�� Commimtion lie�uletion No. $ PaR $. and is �reby cau6ed by tlx ;�� -. aime of l:olpndo in du followinQ discipNne: �: ;� Afr Monhorieg SpeciaU4lt'` �w.a: �rsuzai Ecpiw w: 7ItS401 S � ._ Y_,. ii�'.'i,� f...CC. �f%� �MrMMiw�b+.+�. • IY siykr� �u�.O.r r.I+�+•N�urw.iM.Yr.pww+�.ry.av n+qYir' Y Je �t}4e yaqHf�na 5 0 � ��_ .,.�,.5,...�.o.:`.i�sn°�s".;ee e a a "'°i,�,in°.°'f ::. ., . . . . . . . . , „ ,. ,!:�? ,p � . . . . . . .. . . , . . _ . � :'} . ,L� . �� G:�� . . . . , �htf� 0 . f,t,i, r,i� � . CJ� U. , > >V. � � . . Halr. .. . . ,l4 —; u - , - � � STATE QR �-�OLORAD� � � � -. _ ti.�- � �.�iti�./�� ..i � �✓ �� � � - •,��, �. . �. � ti ��:✓'`�ti .�.«� , :.. - . � .� .. . _ . ' . �/\�`-��.,�^~•J'\/\ :_.. ...� .;. _ . /.ti`j� ..���%`l \�\i. ,... \� .�%� � ...� . "',. . � ':..' , - . . _ \/ . ..� \�'J '�. %'t 1 . � , � � `ti�W/�.�f\`� ../,..�_._• . _ . � . . �`�. i.,wJ�� .,L�/ \�.-.`_. � �� \ \ �./�� �. '�.. ' � �.- ..,. . . � . ., /-� . ��` 'r.. f \... � �\:� � 'i t - , , , �- '� � "; " ASBESTO� C(JN��ULTING �IRM '�, �'\..''��,.�- �v ti �� rr \� `,i ��.:. . J,"� / �-'"\ �� i � i .. • ��-� � � � ':� .� i. , "�.i .� �..:' � _. - _ , . .. . . . .. .. r �: ,� �. f !, . � "� `„"/�'\.�''_`....+�1,��"� . . .. _ _. � �,."��-� -�,� � ' j � � � � � � - � ' '�- ` � �G�olor�do Department of Pubiic F�ealth � `"� �\ � � f ✓ ��, .. r� . . R .. �/ ` � \ � \ 1���, � . . \ . � ' . . `��- � '. ��� /-�'� 's^ � �.. � ,.�. " � ' . '�''`,�` . � 'q � : '� � `� i"�. � � / �: ,�. �J f �✓ .,; ��, -� and Environment ' - ��; ,� -�; �, . � 1. �.I'�, � � . .. -+a. � ` � . . . . � �.. � .,� � . l \`,- -., " �; �✓�,.-� �-�,, ..., ; 1 O l V �"`�•,, � � ; ;--- � � --.;_ � �- , . Pollution Cont � 1 D' is�.on: � �;, �` ��,� _ �� � � �� Air � - �;r -. .-� . � -• - � � �: � �--�� �� , . � � .,. J�'f .'`� `�. �� `.� .; ,. "�' \ ^. ,� J, _/`� 7 ��\ /1..�.,��� 4 _:. � _. �� . _ . . +.: •�: � � '� .�.. .� ` , ^� / � .; -.h... � . .: . ... . . . � � � - .'� %�,-'-� �� �, r� r \ � � . C �. -� �� ..;;._ � = :�` � ,��-'` ��'`,� T'his certif es that ,,� ;.��-.,�,� � ; `_;� -= .� ,- . � v, . � ,.� � _ x� _,. . � "i"� � .;i .�. '� � •. �i...'• . � ' .. . � .. ��.�. � � 'r^,^.�r � � i .�,i-\ . � / � �.� . f , :. r, . � "��.- . ' �. , _��� ,..�.. i,.^`_ , . . . �' � . . �� i � �... , �,,.`ti. �,�ti..: . � -•r �. �.' � i � i � ..a � �� ;.- . . . _. . .: � � � '_, .�/,. ..i.�:..-� .`r` �-�, .� ��' r`�'l � � ._;� �"'�'`-. � � '" � ~ '�- �' , � �, i'"'\�'�� �+�:� _ � 2 � ;; ��;; _,�;-a, ,, � ,.�.- �. � -�;._ DS Consulting .:Inc. � � . .,� ;�`�. - � .� � . ��� � � � .� _ _ � .-^ T +� � �� �:' -'� � : s ., �,-; � � . '�-i �' � , � , � ;. � l � � ;-.� � %'� � ^�,� � �� S \ i .�-; y -'� :� r ti� '- :'.� _.=� . � � . �� ��. \ � - ` � -' � r � �.-�'� .s � � ,, . � � " Regis , A�F ;:=1491Z- ` • � tratian IVo. s � � = -.. - K \ _ _ ,. ` � � : `:: ` = , ._ : � � � \ has met the registrati�on requlrem�r�ts`of 2;5�-7-507„ C.R.�, ar�d' the Ai��Quality Control � �; Cammission Regulation�No. 8,, Part B,'and is hereby autborized ta'�perform asbe�tos consulting , . . � � activities as•:required'urlder. �egutatton �+To•S, Pari_B; inthe state �f Coloradv. - , _ , ; �, ; :.: . � : � . _ � � � �r .��5" "� �: �t� . ...`y I � . J„� ._' . � . . � / .\ � � �M.e, .' "� $�:�.4�' � \ w ;' \J �. \ •� � -. ������'+•�J � ;�^ f \� � � r �- ti.. Issued: January 30, 241� .� .. �, _ - ^ "` _ ' �� .�-,�� �,;w ,, r' ; �:., � � 3Q 201 � Expires: January , 3 �� : `�` �;'��- ��' , - ; _ _ _ _ __ _ � ' �' _ _ : . -` � "� �-� � ��� ' � ,'��,� Authorized APCD Representative' :x �. ; � .� � �i-�`�'�. � � -� ,-!.:- i ` �� ..i r``��. ��, �.: �:' -� ' �'�r� ���-�" :: � �� �� � 4 , ' . .. ,, y _ ,,_. � �� . .... , � �- .�-i. __ . . . - . , . , .... �-. � . , �, _ . � � , . � : f.` : ... . . , . ., �� . �_ _' . , - . CX .. �. � .. . � � SC�1� ,��.. , . ; � . . '. . . .. . Y.... ..: � st�'3lf � t il - . �. . . , . -:, - , . . '[� .ra:�.i- -t r ,.�-rtz � ..�i'zYA-•� :�.i �� . - 'rt � `n.:rlrhfr �-: r � -� t+ ri `n .rm 1� r.i:4rtY+i�ii r �Pw. � "_ ��; ,• � . . . ..�, .. . ` : , 4� � �°rKi � -�'��•azrT -•;•- `� t �a�r�rt .*^ ` �-wn v��Y'w. ` 'cr."Tp?F'+r- t i- '�"`r"�''T'�»"� ] '��,T'x'�„' !� • ��'7� �(j� � �. �����.�..,.ti , .. .�<,.r�:l., �,;8:��. �' ��.: �`9,. � �*� � . . _•`= `::�t ..�,.7 �1 � �. .��:,, ..• .,,:�� _ . �.�.'7 �`'�'i � �.:�;,+! `_. i �:11 ��iS:�--�:?��� �"-�.� :���`,�. � +�.`� �f *"�' . °f�.� �-�7'�Z`'�'*--�' .�`3:"y?�Iwa r3 �:oy.��s>r.:.��� Ah�r..,;"` aS-0.::;:'' .�¢�lssSrY����.�a�� o�yAB:�' .\'rsg� im'1R aeyh /;;,;�, p+� 9lF�,a41� -4,�7� �ao� rJ534ai�iit! �yr`•�r � � '��" . ' ��..dra . ... _<.�..__..._ _._.;. _.�. .:.,�.:6'; _ _' d •ii4e:.-' .'+.:.fd�r;�, �;s)k�R....�. � .{ � Ski Country Construction, Inc COA'S1h1C110A.1A(�. PO BOX 9 Frisco, CO, 80443 970-668-9969 970-668-0548(Fax) Client: Anne Robertson Property: 4506 Spruce Way Apt 2 Vail, CO 81657 Operator Info: Operator: MT Estimator: Kenny Thaemert Type of Estimate: Date Entered: 5/25/2012 Price List: CORE7X MAY12 Labor Efficiency: Restoration/Service/Remodel Estimate: ROBERTSON REBUILD P Date Assigned: Business: (970) 485-2629 The following is our estimate to perform water damage restoration work at 4506 Spruce Way Vail Colorado 81657. Kenny Thaemert Ski Country Construction (970)485-2629 kenny @ skicountryconstruction.com ,�_ �� Ski Country Construction, Inc � ��„�k« ��«>�. �����. Po Box 9 Frisco, CO, 80443 970-668-9969 970-668-0548(Fax) ROBERTSON_REBUILD_P Main Level Main Level DESCRIPTION QNTY REMOVE Taxes, insurance, permits & fees (Bid item) 1.00 EA 0.00 This figure is an estimate and will change depending on actual figures Content Manipulation charge - per hour 16.00 HR 0.00 Labor to manipulate all contents throughout duration of job. Dumpster load - Approx. 20 yards, 4 tons of 1.00 EA 52291 debris Cleaning Technician - per hour 8.00 HR 0.00 Two Techs 4 hours each to perform thorough final construction clean upon completion of work. Line item to match State Farm number 1.00 HR 0.00 Total: Main Level Kitchen :�� � � m � � 19333 SF Walls 260.83 SF Walls & Ceiling 7.50 SY Flooring 24.17 LF Ceil. Perimeter � Missing Wall 9' X 8' DESCRIPTION QNTY Cabinetry - lower (base) units 11.42 LF Cabinetry - upper (wall) units 17.00 LF Countertop - Tile 36.00 SF I/2" Cement board 36.00 SF Ceramic Tile Floaring Installer - per hour 2.00 HR Additional labor necessary to cut out sink into tile counter top Trim board - l" x 4" - installed (hardwood - 18.00 LF oak or =) To install oak nosing around perimeter of counter top. Stain & finish trim I 8.00 LF Sink - double - Detach & reset 1.00 EA ROBERTSON_REBUiLD_P REMOVE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 REPLA CE 1,000.00 49.20 0.00 53.11 -352.52 TOTAL 1,000.00 78720 522.91 424.88 -352.52 2,382.47 Height: 8' 67.50 SF Ceiling 67.50 SF Floor 24.17 LF Floor Perimeter Opens into HALLWAY REPLACE 163.15 121.19 20.06 3.34 82.00 4.09 1.31 125.09 6/21 /2012 TOTAL 1,863.17 �,060.23 722.16 120.24 164.00 73.62 23.58 125.09 Page: 2 ,Si�i Ski Country Construction, Inc ���,��h�����r���. �����. Po Box 9 Frisco, CO, 80443 970-668-9969 970-668-0548(Fax) CONTINUED - Kitchen DESCRIPTION QNTY REMOVE REPLACE TOTAL Garbage disposer - Detach & reset 1.00 EA 0.00 126.33 126.33 Refrigerator - Remove & reset 1.00 EA 0.00 44.41 44.41 Range - electric - Remove & reset 1.00 EA 0.00 57.93 57.93 Dishwasher - Detach & reset 1.00 EA 0.00 214.92 214.92 1/2" drywall - hung, taped, floated, ready for 128.69 SF 0.00 1.98 254.81 paint Drywall Installer / Finisher - per hour 1.00 HR 0.00 89.31 8931 Additional labor to match texture to existing Seal/prime then paint the walls and ceiling 260.83 SF 0.00 0.76 198.23 (2 coats) Mask or cover per square foot 67.50 SF 0.40 0.00 27.00 Outlet or switch cover 5.00 EA 0.00 2.05 10.25 Totals: Kitchen 6,175.28 �I-3'8'�� S�I �� � T �i� Q ! ;�, � �g9 ( ��o•r� Missing Wall DESCRIPTION Entry/Foyer 216.00 SF Walls 272.57 SF Walls & Ceiling 629 SY Flooring 27.00 LF Ceil. Perimeter 4' X 8' QNTY REMOVE Height: 8' 56.57 SF Ceiling 56.57 SF Floor 27.00 LF Floor Perimeter Opens into HALLWAY REPLACE TOTAL Carpet 68.67 SF 0.00 3.62 �8.59 Per ITEL Carpet pad 56.57 SF 0.00 0.59 33.38 R&R 1/2" drywall - hung, taped, floated, 80.00 SF 0.40 1.98 190.40 ready for paint Existing drywall installed over concrete wall has been compromised due to removal of wall paper. Re installation of wall paper over this surface will not adhere properly and will bubble over time. Due to this drywall must be removed and replaced. Drywall Installer / Finisher - per hour 1.00 HR 0.00 89.31 89.31 Additional labor to glue / install drywall on concrete wall with no nailing surface. Paint baseboard heater 14.75 LF 0.00 5.44 8024 Wallpaper 216.00 SF 0.00 2.13 460.08 ROBERTSON_REBUILD_P 6/21 /2012 Page: 3 � Ski Country Construction, Inc co�,rhi ci �o�, ���c. Po Box 9 Frisco, CO, 80443 970-668-9969 970-668-0548(Fax) CONTINUED - Entry/Foyer DESCRIPTION QNTY REMOVE REPLACE TOTAL Baseboard - 3 1/4" 51.00 LF 0.00 3.09 157.59 Paint baseboard - two coats 51.00 LF 0.00 1.19 60.69 Seal & paint acoustic ceiling (popcorn) 56.57 SF 0.00 1.02 57.70 texture Totals: Entry/Foyer 1,377.98 F- tio' r -� s� r T �.d�„ ima.. v o � ;� 3'8" '6"}-3'S � r�„�� DESCRIPTION Laundry Room 238.67 SF Walls 289.78 SF Walls & Ceiling 5.68 SY Flooring 29.83 LF Ceil. Perimeter QNTY REMOVE Height: 8' 51.11 SF Ceiling 51.1 l SF Floor 29.83 LF Floor Perimeter REPLACE TOTAL Interior door - Detach & reset - slab only 1.00 EA 0.00 20.99 20.99 1/2" drywall - hung, [aped, floated, ready for 58.32 SF 0.00 1.98 115.47 paint Drywall Installer / Finisher - per hour 1.00 HR 0.00 8931 89.31 Additional labor to match texture to existing Seal/prime then paint the surface area (2 1 19.33 SF 0.00 0.76 90.69 coats) Mask or cover per square foot 51.11 SF 0.40 0.00 20.44 Washing machine - Remove & reset 1.00 EA 0.00 37.00 37.00 Dryer - Electric - Standard grade Detach and 1.00 EA 0.00 33.31 33.31 Reset Casing - 2 1/4" 17.00 LF 0.00 1.75 29.75 Paint casing - two coats 17.00 LF 0.00 1.19 20.23 Totals: Laundry Room 457.19 ROBERTSON_REBUILD_P 6/21/2012 Page:4 Si�i Ski Country Construction, Inc co�, rx� c uo�. �sr �. Po Box 9 Frisco, CO, 80443 970-668-9969 970-668-0548(Fax) � Living Room � - �� - - ,�---- „t !� 7T 3 -.{; F' , 1T 9"-� Missing Wall - Goes to Floor DESCRIPTION 436.67 SF Walls 635.04 SF Walls & Ceiling 22.04 SY Flooring 57.50 LF Ceil. Perimeter 3'6"X6'8" QNTY REMOVE Height: 8' 198.38 SF Ceiling 198.38 SF Floor 54.00 LF Floor Perimeter Opens into HALLWAY REPLACE TOTAL Carpet 424.34 SF 0.00 3.62 1,536.11 Per ITEL Carpet pad 198.38 SF 0.00 0.59 117.04 1/2" drywall - hung, taped, floated, ready for 138.00 SF 0.00 1.98 273.24 paint Drywall Installer / Finisher - per hour 1.00 HR 0.00 89.31 89.31 Existing drywall installed over concrete wall has been compromised due to removal of wall paper. Re installation of wall paper over this surface will not adhere properly and will bubble over time. Due to this drywall must be removed and replaced. Wallpaper 327.50 SF 0.00 2.13 697.58 Seal & paint acoustic ceiling (popcorn) 19838 SF 0.00 1.02 202.35 texture Mask or cover per square foot 198.38 SF 0.40 0.00 7935 R&R Mirror - 1/4" plate glass 12.00 SF 0.27 12.33 151.20 To replace living room mirror which was removed and damaged during mitigation Paint baseboard heater 14.75 LF 0.00 5.44 80.24 Totals: Living Room 3,226.42 2' 3" i ClOSet 2 T � 1 , s�c I � - ` . �, �, ----1_- f- 2' T' -I �rL ��c DESCRIPTION Carpet Per ITEL ROBERTSON_REBUILD_P 110.67 SF Walls 12025 SF Walls & Ceiling 1.06 SY Flooring 13.83 LF Ceil. Perimeter QNTY 35.00 SF REMOVE '1 11 Height: 8' 9.58 SF Ceiling 9.58 SF Floor 13.83 LF Floor Perimeter REPLACE 3.62 6/2] /2012 TOTAL 126.70 Page: 5 Si(x Ski Country Construction, Inc co�srnrii�io�,���. Po Box 9 Frisco, CO, 80443 970-668-9969 970-668-0548(Fax) DESCRIPTION Carpet pad Totals: Closet 2 Stairs �� CONTINUED - Closet 2 QNTY REMOVE 9.58 SF 0.00 REPLACE 0.59 TOTAL 5.65 132.35 Height: 17' T �� 137.71 SF Walls 16.00 SF Ceiling N = � 153.71 SF Walls & Ceiling 43.75 SF Floor �' 0 4.86 SY Floaring 22.05 LF Floor Perimeter 14.00 LF Ceil. Perimeter e�„icw� Missing Wall 3' X 17' Opens into HALLWAY Missing Wall 3' X 17' Opens into LANDING DESCRIPTION QNTY REMOVE REPLACE TOTAL Carpet 98.50 SF 0.00 3.62 356.57 Per IT'EL Carpet pad 43.75 SF 0.00 0.59 25.81 Step charge for "waterfall" carpet 20.00 EA 0.00 5.56 1 1 1.20 installation SeaUprime then paint the surface area (2 137.71 SF 0.00 OJ6 104.66 coats) Wallpaper 34.43 SF 0.00 2.13 73.34 Paint s[air skirUapron 22.05 LF 0.00 4.82 10628 To refinish stair skirt which incured damage from contents pack out as well as water mitigation. Totals: Stairs 777.86 ROBERTSON_REBUiLD_P 6/2l/2012 Page:6 S� co�.rx�crio�.i�<�. Ski Country Construction, Inc Po Box 9 Frisco, CO, 80443 970-668-9969 970-668-0548(Fax) Landing F- 5' T -� 5 3" ir 7 3" -� 3• c, 1 r »- �- Missing Wall DESCRIPTION 145.83 SF Walls 156.83 SF Walls & Ceiling 1.22 SY Flooring 14.67 LF Ceil. Perimeter 3' X 17' QNTY REMOVE Height: 17' 1 1.00 SF Ceiling 1 1.00 SF Floor 14.67 LF Floor Perimeter Opens into STAIRS REPLACE TOTAL Carpet 36.66 SF 0.00 3.62 132.71 Per ITEL Carpet pad 1 1.00 SF 0.00 0.59 6.49 Seal/prime then paint the surface area (2 145.83 SF 0.00 0.76 110.83 coats) Totals: Landing 250.03 � g " � Hallway � ----- --------- �z•ri ! � � f ', 11' q' �� �t4'11'� Missing Wall Missing Wall Missing Wall - Goes to Floor Missing Wall 147.33 SF Walls 205.90 SF Walls & Ceiling 6.51 SY Flooring 2433 LF Ceil. Perimeter 3' X 8' 4' X 8' 3'6"X6'S" 9' X 8' Height: 8' 58.57 SF Ceiling 58.57 SF Floor 17.83 LF Floor Perimeter Opens into STAIRS Opens into ENTRY_FOYER Opens into LIVING_ROOM Opens into KITCHEN DESCRIPTION QNTY REMOVE REPLACE TOTAL Carpet 70.92 SF 0.00 3.62 256.73 Per ITEL Carpet pad 58.57 SF 0.00 0.59 34.56 I/2" drywall - hung, taped, floated, ready for 1 18.00 SF 0.00 1.98 233.64 paint Existing drywall installed over concrete wall has been compromised due to removal of wall paper. Re installation of wall paper over this surface will not adhere properly and will bubble over time. Due to this drywall must be removed and replaced. Drywall Installer / Finisher - per hour 1.50 HR 0.00 89.31 133.97 ROBERTSON_REBUILD_P 6/21/2012 Page:7 S� Ski Country Construction, Inc ��3�,�h<<�.�,.����. Po Box 9 Frisco, CO, 80443 970-668-9969 970-668-0548(Fax) CONTINUED - Hallway DESCRIPTION QNTY REMOVE REPLACE TOTAL Existing drywall installed over concrete wall has been compromised due to removal of wa(I paper. Re installation of wall paper over this surface will not adhere properly and will bubble over time. Due to this drywall must be removed and replaced. Wallpaper 118.00 SF 0.00 2.13 251.34 Paint baseboard heater 14.75 LF 0.00 5.44 80.24 Seal & paint acoustic ceiling (popcorn) 58.57 SF 0.00 1.02 59.74 texture Totals: Hallway 1,050.22 Total: Main Level 15,829.80 1- 5' S" -� 4.,,• T I � � �s•ir a- �z'ri �c Bathroom Second Level 201.33 SF Walls 239.03 SF Walls & Ceiling 4.19 SY Flooring 25.17 LF Ceil. Perimeter Height: 8' 37.69 SF Ceiling 37.69 SF Floor 25.17 LF Floor Perimeter DESCRIPTION QNTY REMOVE REPLACE TOTAL R&R T- molding - for wood flooring 3.00 LF 0.38 5.45 17.49 Interior door - Detach & reset - slab only 1.00 EA 0.00 20.99 20.99 Totals: Bathroom 38.48 Master Bedroom � ae��* 398.67 SF Walls �� -" �--�- " 552.61 SF Walls & Ceiling m " 17.10 SY Flooring m t3' -' � 49.83 LF Ceil. Perimeter � „�,•� DESCRIPTION QNTY Carpet 166.83 SF ROBERTSON_REBUILD_P Height: 8' 153.94 SF Ceiling 153.94 SF Floor 49.83 LF Floor Perimeter REMOVE REPLACE 0.00 3.62 C7L►�IL►.LIIf►a TOTAL 603.92 Page: 8 ,Si�i Ski Country Construction, Inc ��",k�� �,�>�,��<. Po Box 9 Friscq CO, 80443 970-668-9969 970-668-0548(Fax) CONTINUED - Master Bedroom DESCRIPTION QNTY REMOVE REPLACE TOTAL Per ITEL Carpet pad 153.94 SF 0.00 0.59 90.82 Interior door - Colonist - pre-hung unit 1.00 EA 0.00 152.55 152.55 Paint door slab only - 2 coats (per side) 2.00 EA 0.00 25.01 50.02 Paint door/window trim & jamb - 2 coats 1.00 EA 0.00 25.66 25.66 (per side) Casing - 2 1/4" 34.00 LF 0.00 1J5 59.50 Door lockset - Detach & reset 1.00 EA 0.00 26.45 26.45 1/2" drywall - hung, [aped, floated, ready for 118.00 SF 0.00 1.98 233.64 paint Existing drywall installed over concrete wall has been compromised due to removal of wall paper. Re installation of wall paper over this surface will not adhere properly and will bubble over time. Due to this drywall must be removed and replaced. Drywall Installer / Finisher - per hour 1.50 HR 0.00 89.31 133.97 Existing drywall installed over concrete wall has been compromised due to removal of wall paper. Re installation of wall paper over this surface will not adhere properly and will bubble over time. Due to this drywall mus[ be removed and replaced. Seal/prime then paint the surface area (2 140.00 SF 0.00 0.76 106.40 coats) Mask or cover per square foot 153.94 SF 0.40 0.00 61.58 Outlet or switch cover 5.00 EA 0.00 2.05 10.25 Totals: Master Bedroom 1,554.76 � - Linen Closet -�� ,. � DESCRIPTION 64.00 SF Walls 67.56 SF Walls & Ceiling 0.40 SY Flooring 8.00 LF Ceil. Perimeter QNTY REMOVE Height: 8' 3.56 SF Ceiling 3.56 SF Floor 8.00 LF Floor Perimeter REPLACE TOTAL Carpet 10.42 SF 0.00 3.62 37.72 Carpet pad 3.56 SF 0.00 0.59 2.10 1/2" drywall - hung, taped, floated, ready for 67.56 SF 0.00 1.98 133.77 paint Existing drywall installed over concrete wall has been compromised due to removal of wall paper. Re installation of wall paper over this surface will not adhere properly and will bubble over time. Due to this drywall must be removed and replaced. ROBERTSON_REBUILD_P 6/2l/2012 Page:9 $�i t� Ski Country Construction, Inc coa„x� crio�.,�c. Po Box 9 Frisco, CO, 80443 970-668-9969 970-668-0548(Fax) CONTINUED - Linen Closet DESCRIPTION QNTY REMOVE REPLACE TOTAL Drywall Installer / Finisher - per hour 1.00 HR 0.00 89.31 89.31 Existing drywall installed over concrete wall has been compromised due to removal of wall paper. Re installation of wall paper over this surface will not adhere properly and will bubble over time. Due to this drywall must be removed and replaced. SeaUprime then paint the surface area (2 67.56 SF 0.00 0.76 51.35 coats) Mask or cover per square foot 3.56 SF 0.40 0.00 1.42 Interior door - Colonist - pre-hung unit 1.00 EA 0.00 152.55 152.55 Paint door slab only - 2 coats (per side) 2.00 EA 0.00 25.01 50.02 Paint door/window trim & jamb - 2 coats 1.00 EA 0.00 25.66 25.66 (per side) Casing - 2 1/4" 34.00 LF 0.00 L75 59.50 Door lockset - Detach & reset 1.00 EA 0.00 26.45 26.45 Organized closet shelving 13.33 SF 0.00 9.47 126.24 Totals: Linen Closet 756.09 �d� �- _.i Master Closet Height: 8' 16533 SF Walls 191.33 SF Walls & Ceiling 2.89 SY Flooring 20.67 LF Ceil. Perimeter 26.00 SF Ceiling 26.00 SF Floor 20.67 LF Floor Perimeter DESCRIPTION QNTY REMOVE REPLACE TOTAL Carpet 33.33 SF 0.00 3.62 120.65 Carpet pad 26.00 SF 0.00 0.59 15.34 Casing - 2 1/4" 34.00 LF 0.00 1.75 59.50 Paint casing - two coats 34.00 LF 0.00 L 19 40.46 Totals: Master Closet 235.95 ROBERTSON_REBUILD_P 6/2l/2012 Page:10 � Ski Country Construction, Inc ��„���:«�,,���, ��<�. Po Box 9 Frisco, CO, 80443 970-668-9969 970-668-0548 (Fax) .� ` s�iz �� � � Hallway - t s.. 1zT, T m �.�'�'7` �-,s „-� Missing Wall Missing Wall Missing Wall Missing Wall Missing Wall 258.67 SF Walls 31128 SF Walls & Ceiling 5.85 SY Flooring 33.00 LF CeiL Perimeter 8"X8' 1"X8' 3'4"X8' 1"X8' 1'8"X8' Height: 8' 52.61 SF Ceiling 52.61 SF Floor 3233 LF Floor Perimeter Opens into STAIRS Opens into Exterior Opens into Exterior Opens into Exterior Opens into Exterior DESCRIPTION QNTY REMOVE REPLACE TOTAL Carpet 68.00 SF 0.00 3.62 246.16 Carpet pad 52.61 SF 0.00 0.59 31.04 Drywall replacement per LF - up to 2' tall 10.00 LF 0.00 7.98 79.80 Drywall Installer / Finisher - per hour l.00 HR 0.00 8931 89.31 Existing drywall installed over concrete wall has been compromised due to removal of wall paper. Re installation of wall paper over this surface will not adhere properly and will bubble over time. Due to this drywall must be removed and replaced. SeaUprime then paint the surface area (2 129.33 SF 0.00 0.76 98.29 coats) Mask or cover per square foot 52.61 SF 0.40 0.00 21.04 Totals: Hallway 565.64 �T � a �� , T . m � Stairs ��0 139.88 SF Walls 153.88 SF Walls & Ceiling 3.13 SY Flooring � 9.50 LF Ceil. Perimeter � I I Missing Wall Missing Wall Missing Wall DESCRIPTION Carpet ROBERTSON_REBUILD_P S"X17' 2'4"X17' 3' X 17' QNTY 69.34 SF Height: 17' 14.00 SF Ceiling 28.13 SF Floor 12.19 LF Floor Perimeter Opens into HALLWAY Opens into Exterior Opens into Exterior REMOVE REPLACE TOTAL U�III; 3.62 6/21 /2012 251.01 Page: 11 ,S� 5ki Country Construction, Inc COVtitRCC110\,1.\C. Po Box 9 Frisco, CO, 80443 970-668-9969 970-668-0548(Fax) CONTINUED - Stairs DESCRIPTION QNTY REMOVE REPLACE TOTAL Carpet pad 28.13 SF 0.00 0.59 16.60 Step charge for "waterfall" carpet 20.00 EA 0.00 5.56 11120 installation Seal/prime then paint the surface area (2 139.88 SF 0.00 0.76 106.31 coats) Mask or cover per square foot 28.13 SF 0.40 0.00 11.25 Totals: Stairs 49637 Total: Second Level 3,64729 �,r ,o---� „� T �s.-� �l �m T,5 � ,� � _ . . -- l� T �1 DESCRIPTION Loft Third Level 512.00 SF Walls 658.42 SF Walls & Ceiling 16.27 SY Flooring 64.00 LF Ceil. Perimeter QNTY REMOVE Carpet 162.50 SF 0.00 3.62 588.25 Per ITEL Carpet pad 146.42 SF 0.00 0.59 86.39 Casing - 2 1/4" 9.00 LF 0.00 1.75 15.75 Paint casing - two coats 9.00 LF 0.00 I.19 10.71 Drywall replacement per LF - up to 2' tall 7.00 LF 0.00 7.98 55.86 Drywall Installer / Finisher - per hour 1.50 HR 0.00 89.31 133.97 Labor necessary to match texture to existing SeaUprime then paint the surface area (2 512.00 SF 0.00 0.76 389.12 coats) Mask or cover per square foot 146.42 SF 0.40 0.00 58.57 Deck hand rail/guard rail - Labor only 10.00 LF 0.00 2131 213.10 Carpenter - Finish, Trim / Cabinet - per hour 4.00 HR 0.00 87.84 351.36 Labor to repair loft ladder which has experienced wear and tear from water mitigation and plumbing work. This also includes to reset mechanical room door. ROBERTSON_REBUiLD_P 6/21/2012 Page:12 Height: 8' 146.42 SF Ceiling 146.42 SF Floor 64.00 LF Floor Perimeter REPLACE TOTAL � i�o.�vrxi cuo�, i�c. Ski Country Construction, Inc Po Box 9 Frisco, CO, 80443 970-668-9969 970-668-0548(Fax) CONTINUED - Loft DESCRIPTION QNTY REMOVE REPLACE TOTAL Totals: Loft 1,903.08 Total: Third Level l ,903.08 Line Item Subtotals: ROBERTSON REBUILD P Adjustments for Base Service Charges Adjustment Carpenter - General Framer 166.46 Drywall installer/Finisher 357.24 Hardware Installer 158.16 General Laborer 49.20 Plumber 210.00 Tile/Cultured Marble Installer 164.00 Wallpaper Hanger I 50.18 Total Adjustments for Base Service Charges: 1,255.24 Line Item Totals: ROBERTSON_REBUILD_P 22,635.41 Grand Total Areas: 4,140.27 SF Walls 1, I 04.55 SF Floor 0.00 SF Long Wall 1,104.55 Floor Area 2,489.60 Exterior Wall Area 0.00 Surface Area 0.00 Total Ridge Length 1,062.68 SF Ceiling 122.73 SY Flooring 0.00 SF Short Wall 1,195.33 Total Area 28 I 21 Exterior Perimeter of Walls 0.00 Number of Squares 0.00 Total Hip Length 5,202.95 SF Walls and Ceiling 512.34 LF Floor Perimeter 512.27 LF CeiL Perimeter 3,550.85 Interior Wall Area 0.00 Total Perimeter Length ROBERTSON_REBUILD_P 6/2l/2012 Page:13 � Ski Country Construction, Inc � ��„k� � �,�,�. ��<. Po Box 9 Frisco, CO, 804�13 970-668-9969 970-668-0548(Fax) Line Item Total Total Adjustments for Base Service Charges Material Sales Tax @ 7.900% x Overhead @ 10.0% x Profit @ ] 0.0% x Replacement Cost Value Net Claim Kenny Thaemert Summary 8,696.64 23,639.02 23,639.02 21,— 380 7 1, 55.24 687.03 23,322.44 2,363.90 2,363.90 $28,050.24 $28,050.24 ROBERTSON_REBUILD_P 6/21 /2012 Page: 14 02-22-2013 Inspection Request Reporting , U33V Page 11 4:02 pm Vail, CO - City Of T(2 Requested Inspect Date: Monday, February 25,20 3 Site Address: 4506 SPRUCE WY VAIL Ridgeview Square Unit 2 A/P/D Information Activity B12-0260 Type: COMBO Sub Type AMF Status: ISSUED Const Type Occupanccy: Use Insp Area: Contractor SKI COUNTRY CONSTRUCTION Phone 970-668-9969 Owner: ROBERTSON,ANNE Description: WATER DAMAGE REPAIR DRYWALL PATCH WORK, PAINT,CABINETS, FLOORING INSTALLATION Requested Inspection(s) Item. 90 BLDG-Final Requested Time: 10:00 AM Requestor Phone: Comments FOLLO UP Assigned To SGRFIER Entered By: JMONDRAGON K Action Time Exp: Inspection History Item 30 BLDG-Framing Item 50 BLDG-Insulation Item 60 BLDG-Sheetrock Nail **Approved** 09/07/12 Inspector: nchand Action: AP APPROVED Comment: Item: 70 BLDG-Misc. Item: 90 BLDG-Final REPT131 Run Id: 15067