HomeMy WebLinkAboutB12-0260NOTE: TH/S PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
,.
TC}WN OF VAII,' .
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
COMBINATION BLDG PERMIT Permit #: 612-0260
Job Address: 4506 SPRUCE WY VAIL
Location......: Ridgeview Square Unit 2
Parcel No....: 210112304002
CONTRACTOR SKI COUNTRY CONSTRUCTION 07/10/2012
JEFF CHAVIS
PO BOX 9
FRISCO
CO 80443
License: C000003544
OWNER ROBERTSON, ANNE 06/26/2012
4506 SPRUCE WY 2
VAI L
CO 81657
APPLICANT SKI COUNTRY CONSTRUCTION INC 06/26/2012
PO BOX 9
FRISCO
CO 80443
Project #: PRJ12-0330
Applied.....: 06/26/2012
Issued. . . : 07/17/2012
Phone: 970-668-9969
Phone: 970-688-9969
Description:
WATER DAMAGE REPAIR DRYWALL PATCH WORK, PAINT, CABINETS,
FLOORING INSTALLATION
Occupancy: Type Construction: Valuation: $28,050.24
....,...>.x.....x ...............�....,.x........,....,...........,,,._.........,., FEE SUMMARY ....«.........�.,,................,..,,......,...,.........,,..........,....,..,.
Building Permit -----------> $431.65 Bldg Plan Check ----------> $280.57 Use Tax Fee-----------------------> $361.00
Electrical Permit ---------> $0.00 Elec Plan Check ----------> $0.00 Restuarant Plan Review--------> $0.00
Mechanical Permit ------> $0.00 Mech Plan Check ---------> $0.00 Additional Fees--------------------> $200.00
Plumbing Permit --------> $0.00 Pimb Plan Check ---------> $0.00 Recreation Fee--------------------> $0.00
Investigation-----------------------> $0.00
Will Call------------------------------> $5.00
TOTAL PERMIT FEES--------------> $1,278.22
Payments-------------------------------> $1,278.22
BALANCE DUE------------------------> $0.00
...... � ........................................................................,�.,�,,.,,,.,,,,........,.,...,....................,..., ......,.....,......,,........,..,,,...,..,...,....
DECLARATtONS
I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and
other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149
OR AT OUR OFFICE FROM 8:00 AM - 4:00 PM.
combination permit_012811
�
................>,.,,,........,�.....,....,..............,,....,.,.....,..,...........,...,..,......,,.,......,,...........,,,....,........,..,.....<........,....,.,..,...,. �,......
CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF
Permit #: 612-0260
Owner: ROBERTSON, ANNE
Ridgeview Square Unit 2
Address: 4506 SPRUCE WY VAIL
Location:
............................................................................................................................................ � �...,....... �.........,.........,.......
combination permit_012811
!
�
TOWN OF VAI� '
�***.***...***,*****.********..******************************�****�****..**„***,..******************.************************..**,.*.,.�*.,�.�**********
REQUIRED INSPECTIONS AND STATUSES
Permit #: 612-0260
Owner: ROBERTSON, ANNE
Ridgeview Square Unit 2
Address: 4506 SPRUCE WY VAIL
Location:
.*,.*****�*.*******,.�**«****�*********,.,.*******,.**���********«*******************�,.**.****.�*�****„*�******,,,,***************.,**„**.,***�..**..�**,�**.****
Item: 00030 BLDG-Framing
Item: 00050 BLDG-Insulation
Item: 00060 BLDG-Sheetrock Nail
Item: 00070 BLDG-Misc.
Item: 00090 BLDG-Final
combination permit_012811
****«******************************+********************************************************
TOWN OF VAIL, COLORADO Statement
***********�++*****************************************+**�*****************************�***
Statement Number: R120000926 Amount: $492.46 07/17/201210:44 AM
Payment Method:Credit Crd Init: DR
Notation: VISA MARTINA
TATAREK (SKI COUNTRY CONST)
-----------------------------------------------------------------------------
Permit No: B12-0260 Type: COMBINATION BLDG PERMIT
Parcel No: 2101-123-0400-2
Site Address: 4506 SPRUCE WY VAIL
Location: Ridgeview Square Unit 2
Total Fees: $1,278.22
This Payment: $492.46 Total ALL Pmts: $1,278.22
Balance: $0.00
**********************+*********************************************************************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
BP 00100003111100 BUILDING PERMIT FEES 105.50
CL 00100003123000 CONTRACTOR LICENSES 200.00
PF 00100003112300 PLAN CHECK FEES 53.56
UT 11000003106000 USE TAX 40 133.40
TOWN OF UpIL COM DEU
75 S FAOHTA6E RD.
VRII� CO B1657
978-419-1324
iERMINAI I.D. � 2AB2
IERCHAHT N:
UISA
t##�k#�iCl�t1468t
SALE
BRTCH; BBB518 INV:000003
AUTH:680168
JUL 17. 12 09:39
TOTAL �492.46
CUSTOlER COPV
TOWN OF VAIL'
Department of Community Development
75 South Frontage Road
Vail, CO 81657
Tel: 970-479-2128
www.va i Igov.com
Development Review Coordinator
BUILDING PERMIT APPLICATION
(Separate applications are required for alarm & sprinkler)
Project Street Address: Project #: 1!/J �Z —�� 3 V
y`�?- '' ^ �
DRB #:
(Number) (Street) (Suite #) -7��
Buildin /Com lex Name: � Building Permit #: � `� ( �lic-� �
9 p ,el ���/iF"t.d `��G^�:�.a-�.=-
Contractor Information Lot #: Block # Subdivision:
Business Name: Ct! 1,r �
�� ��� � Work Class: New (�j Addition (�j Alteration (�j
Business Address: ; ���`.�
City ��jSGI� State: �G� Zip: ,����,� Type of Building:
Single-Family
Contact Name: ,,��".(/.�lJ�l'
Commercial �j
ContactPhone: �%%7'� - �f�S"'r31o,�9
Contact E-Mail: �� �i I�UlP�j C�l[$T�i ����Gype'
�''L.
I hereby acknowledge that I have read this application, filled out
in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to
comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according to
the town's zoning and subdivision codes, design review ap-
proved, International Building and Residential Codes and other
ordinances of the Town applicable thereto.
X _�
er/Own rs Representative Signature (Required)
Applicant Information
�j Duplex (�j Multi-Family (�)
Other �j
Interior �xterior � Both �
Valuation of
Work Included lans Included Work
Electrical �Yes o Yes �No
Mechanical �Yes )No Yes �No t
Plumbing �Yes No �Yes �No �
Building es �No �Yes �No
Value of all work being performed: $ a� ,��' C� -�`�
i
!�value based on IBC Section 109.3 $ IRC Section 108.3� �
Electrical Square Footage �
Detailed Scope and Location of Work:
Applicant Name: Gs�.,/iL(/�C.� �fl`'�i�'l�r,',T"- ���T�� ,��%jry1.,��- t'�i',4.i�
Applicant Phone: ��) 1f�' .�/"o ��' /7� �s,,y21 L,f�' �rG� GiIJP..� �fl-i.ur
Applicant E-MaiL �',c,{.1.� ��' SCi��ci'u.c�T�� GE�ST?�+�liL` �''
—� �f}i�C�/.�!/f'7`o �Ll�?'%P/ .il/�y ��-yl/S `
<L'11.j
Project Informatio
Owner Name: ���fi"E �fi'f���T; Sl1ti
Parcel #: �l� % i - /023 �" G�`t` - C�'�� �
(For Parcel #, contact Eagle County Assessors Office at (970-328-8640 or visit
www.eag lecounty. uslpatie)
For Office Use Only:
Fee Paid: � � �'�
Received From: S l�Qv�% Or��3�,(�c.�c'�-v�ry�
Cash Check # 1 l'�Z
CC: Visa / MC Last 4 CC # exp date:
Auth #
(use additional sheet if necessary)
Date Received: D � ( (�'� � � � �
U
� JUN252012
�/iq i�Al� �
� � �.��� TOWN OF VAIL
� 12-Mar-2012
********************+++++*+**************************�****************+**********+++�+******
TOWN OF VAIL, COLORADOCopy Reprinted on 06-26-2012 at 15:05:36 06/26/2012
Statement
****�+**********�**************************************�*****+**++***********************�*�
Statement Number: Amount: $785.76 06/26/201202:55 PM
Payment Method: Check Init: LC
Notation: #1172 SKI
COUNTRY CONSTRUCTION INC
-----------------------------------------------------------------------------
Permit No: B12-0260 Type: COMBINATION BLDG PERMIT
Parcel No: 2101-123-0400-2
Site Address: 4506 SPRUCE WY VAIL
Location: Ridgeview Square Unit 2
Total Fees: $808.86
This Payment: $785.76 Total ALL Pmts: $785.76
Balance: $23.10
********�*******************+��*****************�*******************************************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
BP 00100003111100 BUILDING PERMIT FEES 326.15
PF 00100003112300 PLAN CHECK FEES 227.01
UT 11000003106000 USE TAX 4�S 227.60
WC 00100003112800 WILL CALL INSPECTION FEE 5.00
-----------------------------------------------------------------------------
� . s
■�; �
PO Box 9
Frisco, CO 80443
970-668-9969
Department of Community Development
75 South Frontage Road
Vail, CO 81657
Re: 4506 Spruce Way Apt 2
� ���o�c�
'� JUN 2 5 2012
; 1/� �- �1
TOWN OF VAIL
To whom it may concern:
Please find a detailed scope of work to be completed, floor plan sketches, building permit application as
well as fee for water damage repair work at 4506 Spruce Way Apt 2.
ServPro of Summit, Lake, Park and Eagle County performed all water mitigation work and demo at this
residence. An asbestos test was performed and all necessary precautions were taken in order to
remove compromised materials. Please find all asbestos testing reports and clearance results attached.
Permit Fee Detail:
Town of Vail Permit Fee Detial
Buildin� Permit Fee
Total Valuation of Work $21,380.00
$69.25 For First $2000 69.25
$14 For Additional $19,000 266
Total Permit Fee $ 335.25
Plan Review Fee
$335.25 x 65% $ 217.91
Construction Use Tax
(($21380-$10000)/2)*.04 $ 227.60
Will Call Inspection Fee $ 5.00
Total Permit Fee Due $ 785.76
Please contact me with any questions
Best Regards
Kenny Thaemert
Ski Country Construction
(970) 485-2629
�� � � �n�
JUN 2 � 7U1`l�
��`
pWN OF VAIL
Vail Fire Department
Asbestos Testing & Abatement Requirements
Asbestos testing and abatement protects workers, homeowners, neighbors and emergency services responders from ex-
posure to harmful asbestos. The Town of Vail asbestos abatement program is in addition to the State of Colorado's regu-
lations. It is your responsibility to be in compliance with the State. Please contact the State directly for their requirements
at the contact info listed below.
When is asbestos testing required?
ANY building projects disturbing more than these threshold levels of building materials require asbestos testing:
One- and Two-Family Dwellings: 32 square feet
All Others (commercial spaces, hotel rooms, etc): 160 square feet
Definition of a single-family dwelling: any dwelling unit that is used primarily for a single family, including
multi-family/condominium units, and fractional fee units.
Asbestos testing results must be provided with your application for a building permit.
Tests which identify POSITIVE results at more than 1% require abatement by a State-certified and Vail-registered abate-
ment contractor. An asbestos abatement permit must be approved, and the clearance letter must be submitted to the
Town of Vail before the building permit will be issued.
Project Checklist
My project falls into the category checked below:
� Will not disturb more than the threshold limits identified above.
� Tested negative, or at 1% or below (1 copies of test results included)
� Tested positive at more than 1%, requires abatement (1 copies of test results included)
Tips & Facts:
• Even recent construction projects may include asbestos-containing materials, so buildings of � age require testing.
• The "1989 Ban" on asbestos-containing materials is commonly misunderstood. "In fact, in 1991 the U.S. Fifth Circuit
Court of Appeals vacated much of the so-called "Asbestos Ban and Phaseout" rule and remanded it to the EPA. Thus,
much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing, or distribution in commerce
of many asbestos-containing product categories was set aside and did not take effect." - CDPHE
Asbestos test results and abatement permit applications should be submitted to: Town of Vail, Community Development,
75 S Frontage Rd, Vail, CO, 81657.
Town of Vail Contact:
Fire Prevention Bureau
Vail Fire Department
75 S Frontage Rd
Fire_inspec±ors@vailgov.com
970-479-2252
www.vailgov.com
State of Colorado Contact:
Colorado Department of Public Health
and Environment
Asbestos Compliance Assistance Group
303-692-3158
a sbestos @state. co. us
www. cd phe. state. co. us
15-May-10
■
onsu n
Asbestos Inspection and Sampling Report
4506 Spruce Way, Unit 2, Vail, Colorado 81657
Presented To:
Ms. Carolanne Basile
SERVPRO of Summit, Lake, Park & Eagle Counties
PO Box 9
Frisco, CO 80443
Performed & Prepared By:
Ms. Edie Stevenson
DS Consulting, Inc.
PO Box 6864
Avon,CO 81620
(720) 480-2963
Project Details:
Project Number: 84
Conducted: May , 012
TABLE OF CONTENTS
PROJECT OVERVIEW
1.0 Introduction
2.0 Scope of Work
3.0 Site Description
4.0 Certifications
5.0 Inspection, Sampling & Analytical Procedures
5.1 Inspection Procedures
5.2 Sampling Procedures
5.3 Analytical Procedures
6.0 Homogeneous Areas
6.1 Material Friability
6.2 Material Classifications
6.3 Material Conditions
6.4 Sample Quantities
7.0 Overview of Findings
8.0 Conclusion & Recommendations
9.0 Asbestos Abatement & Demolition Requirements
10.0 Major Asbestos Spill Response
11.0 Disclaimer & Limitations
APPENDIX A Inspector & Firm Asbestos Certificates
APPENDIX B Analytical Data
2
PROJECT OVERVIEW
1.0 Introduction
DS Consulting, Inc. (DSC) conducted a limited asbestos inspection and collected asbestos bulk-samples of
suspect asbestos-containing materials (ACM) within the residence located at 4506 Spruce Way, Unit 2,
Vail, Colorado.
The purpose of the limited inspection was to identify and sample potentially hazardous friable and non-
friable ACM that may be impacted by upcoming restoration activities.
2.0 Scope of Work
The scope of the limited inspection and bulk-sampling was limited to the walls on all three levels of the
town home as well as the ceiling of the lowest level. The remaining areas within the residence, garage or
any out-building on the property were not included in the scope of the inspection. The limited asbestos
inspection did not constitute a full building inspection and does not fulfill the asbestos inspection
requirements for structures that are to be demolished.
3.0 Site Description
The residence is a wood-framed, three-level, single-family residence in a multi-unit building.
4.0 Certifications
The limited asbestos inspection and bulk-sampling was conducted by Ms. Edie Stevenson with DSC. DSC
is a Colorado Department of Public Health and Environment (CDPHE) certified Asbestos Consulting Firm,
Registration No. 14912. Ms. Stevenson is a CDPHE certified Building Inspector; having certification
number 18406 (seeAppendixA forcertificates).
5.0 Inspection, Sampling & Analytical Procedures
5.1 Inspection Procedures
The limited asbestos inspection was conducted by an Environmental Protection Agency (EPA) and
CDPHE certified Building Inspector. The inspection procedures included identifying and sampling
suspect ACM within the pre-defined areas, submitting samples to an accredited laboratory for analysis,
classifying the materials and assessing their condition, and compiling a final report detailing the
inspection and the analytical results of the bulk-samples.
5.2 Sampling Procedures
Statistically random bulk-samples representative of the suspect ACM of each homogeneous area were
collected according to the guidelines published as EPA Final Rule: Title II of the Toxic Substances
Control Act (TSCA), 15 USC, Sections 2641 through 2654 and in compliance with 40 CFR, Part 763 and
CDPHE Regulation Number 8, Part B- Asbestos (Reg. 8).
DSC has collected the appropriate number of bulk-samples to meet all regulatory requirements for the
classification and quantity of each homogeneous area. Some minor destructive sampling was
conducted; however, walls, columns and perimeter pipe chases were not broken into in order to locate
3
and quantify suspect ACM. It should be noted that additional ACM might be located in these and other
inaccessible areas.
Materials containing less than 1% asbestos are not regulated by CDPHE Regulation 8, Part B- Asbestos.
However, all demolition/abatement activities should be performed following the applicable
Occupational Safety and Health Administration (OSHA) regulations. This would include, but not limited
to, the appropriate asbestos training for the type of material being removed/disturbed as well as having
a properly trained supervisor onsite, using wet removal methods, wearing adequate personal
protective equipment (HEPA-filtered particulate respirators), medical surveillance of workers,
personal-exposure air monitoring, area air monitoring in occupied buildings, etc. There may also be
landfill disposal requirements for these materials, depending on the facility. DSC recommends that all
demolition/renovation areas involving any amount of asbestos be subjected to visual inspections and a
final clearance air testing by a CDPHE-certified Air Monitoring Specialist (AMS) after the work has been
completed, but before any containments are dismantled and the area is reoccupied.
5.3 Analytical Procedures
All asbestos bulk-samples were analyzed by a National Voluntary Laboratory Accreditation Program
(NVLAP) accredited laboratory via Polarized Light Microscopy (PLM) for asbestos content (see
Appendix B for laboratory report).
The percentage of asbestos within each individual bulk-sample can vary depending on sample location,
homogeneity of the material, and the type of application. Any sample reporting a"TRACE" amount of
asbestos must be considered positive for asbestos greater than 1% unless it is re-analyzed utilizing the
point-count method and verified to be less than 1%.
6.0 Homogeneous Areas
A Homogeneous Area (HA) includes materials that are uniform in appearance, color, texture and date of
application. The asbestos content of the bulk-samples collected within a homogeneous area can be
applied to the entire homogenous area if they conform to the above characteristics and the regulated
minimum sample quantities of each type of material are collected and analyzed.
6.1 Material Friability
A material can either be friable or non friable. A friable material is one that, when dry, can be
pulverized, or reduced to powder by hand pressure, a non-friable material cannot. A non-friable
material may become friable if its condition had deteriorated or has been impacted by forces that have
rendered it friable.
6.2 Material Classifications
Sampled materials are divided into one of the following three categories:
• Surfacing Material: sprayed or troweled onto structural building members
• Thermal System Insulation (TSI): any type of pipe, boiler, tank, or duct insulation
• Miscellaneous Material: all other materials not classified in the above two categories
6.3 Material Conditions
Sampled materials are placed into one of the three following categories of conditions:
• Good: none to very little visible damage or deterioration
4
• Damaged: the surface is crumbling, blistered, water-stained, gouged, marred or otherwise abraded
over less than one-tenth of the surface if the damage is evenly distributed, or one-quarter if the
damage is localized
• Significantly Damaged: the surface is crumbling, blistered, water-stained, gouged, marred or
otherwise abraded over greater than one-tenth of the surface if the damage is evenly distributed,
or one-quarter if the damage is localized
6.4 Sample Quantities
DSC collected at least the minimum number of samples from each homogeneous area necessary to meet
all regulatory requirements for the quantity of material to be disturbed. The quantities listed in this
report are approximate and on-site verification of the exact quantity of each material is required. The
following outlines the minimum sample quantities required per homogeneous area:
• Surfacing Materials: up to 1,000 ft2 of material requires a minimum of three (3) samples; between
1,000 ftz and 5,000 ft2 of material requires a minimum of five (5) samples; over 5,000 ftz of
material requires a minimum of seven (7) samples; one (1) sample of each patch
• Thermal System insulation (TSI): each homogeneous area requires a minimum of three (3)
samples; at least one (1) sample must be collected from each patch; and collect enough samples
sufficient to adequately assess the material and determine the asbestos content for TSI fittings
such as pipe elbows or T's.
• Miscellaneous Materials: collect enough samples sufficient to determine the asbestos content
7.0 Overview of Findings
Asbestos was reported within all of the drywall surfacing texture within the main and attic/loft
level of the residence. The drywall wall and ceiling surfacing texture within the lower level was
none-detect for asbestos. DSC collected a total of thirteen (13) asbestos bulk-samples of three (3)
homogeneous areas.
Table 1 below describes the materials composing each homogeneous area as well as the locations of each
bulk-sample collected. Also listed is the classification, condition, friability and estimated quantity of
material to be removed and/or disturbed, as well as the asbestos content within each bulk-sample.
Please see Appendix B: Analytical Data for the layer break-down of each bulk-sample.
E
TABLE 1
HA Sample Material Sample Material Material Estimated Material Asbestos
# ID Description Location Classifrcation Condition Quantity Friability Content
UW1-1 Attic/Loft, North Wall SM G �800 ft� Friable 3�% CHRY
1 DW1-2 Tan, Orange Peel Drywall Main Level Hall, South Wall SM G �800 ftz Friable 2% CHRY
Surfacing Material
DW1-3 Main Level, SE Corner above SM G �800 ft2 Friable 3% CHRY
Door
DW2-1 Lower Level, North Wall at SM G �400 ftz Friable ND
Joint
DW2-2 Lower Level, North Wall SM G �400 ft2 Friable ND
Center
Tan, Orange Peel Drywall Lower Level, North Wall
Z DW2-3 Surfacing Material Center SM G �400 ftz Friable ND
DW1-1 Lower Level Interior Wall SM G �400 ftz Friable ND
DW1-2 Lower Level Interior Wall SM G �400 ftz Friable ND
DW1-3 Lower Level Interior Wall SM G �400 ftz Friable ND
SMC1-1 Lower Level Ceiling SM G �100 ftz Friable ND
SMC1-2 Lower Level Ceiling SM G �100 ftz Friable ND
3 Tan, Rough Drywall Texture
SMC1-3 Lower Level Ceiling SM G �100 ftz Friable ND
MM1 Lower Level Ceiling SM G �100 ftz Friable ND
HA - Homogeneous Area G- Good CHRY - Chrysotile SM - Surfacing Material
ND - None-detect D- Damaged ACT - Actinolite MM - Miscellaneous Material
TR - Trace, <1% Visual Estimate SD - Significantly Damaged TSI - Thermal System Insulation
8.0 Conclusion & Recommendations
ACM was identified within the drywall surfacing texture of the main level and attic/loft level of the town
home that were within the scope of the limited inspection and bulk-sampling performed on May 18, 2012;
therefore, professional abatement activities are required to remove or disturb this asbestos-containing
material.
9.0 Asbestos Abatement & Demolition Requirements
If ACM is to be removed or disturbed in a single-family residence, and the total quantity exceeds any of
the regulatory trigger levels of 501inear ft. on pipes, 32 ftz on other surfaces, or the volume equivalent of
a 55-gallon drum, a CDPHE-certified General Abatement Contractor (GAC) is required to perform the
work. The regulatory trigger levels within a commercial building are 260 linear ft. on pipes, 160 ft2 on
other surfaces, or the volume equivalent of a 55-gallon drum. In addition, formal notification to CDPHE
prior to the abatement of ACM as well as air monitoring, visual inspections, and final air clearances by a
CDPHE-certified Asbestos AMS is required. DSC can provide the client or building owner with a proposal
for project design, abatement oversight and air monitoring upon request.
CDPHE regulations allow for the demolition of a building that contains non-friable asbestos-containing
materials, such as caulking, mastic or resilient floor tiles. However, demolition must be completed
without causing the non-friable ACM to be rendered friable. Burning a building with any ACM is
prohibited. Operations such as sanding, cutting, crushing, grinding, pneumatic jacking, etc. of ACM are
not permitted. Recycling of building materials such as concrete, metal, or wood that are bonded or
contaminated with ACM, e.g. glue, caulking, or mastic is also prohibited. If any of the non-friable asbestos
containing materials are to be recycled and rendered friable after demolition (i.e. crushing mastic-coated
concrete), these materials must be abated of all ACM prior to shipping offsite for recycling.
OSHA regulations regarding occupational exposure during demolition activities is still mandatory. OSHA
29 CFR 1926.1101 requires that workers performing construction-related activities be protected from
asbestos fibers in excess of the permissible exposure limit of 0.1 f/cc of air. Contractors are must comply
with applicable provisions of OSHA 29 CFR 1926.1101 during demolition and renovation activities.
These OSHA provisions include, but are not limited to, PPE and respirators, personnel training, personal-
exposure air monitoring, employee medical surveillance, wet removal methods, signage for regulated
areas, etc.
10.0 Major Asbestos Spill Response
If ACM is significantly damaged and the total quantity exceeds the regulatory trigger levels, the area is
deemed a"Major Asbestos Spill." The area is consequently subject to the requirements in Reg. 8, Section
III.T.1. - Major Asbestos Spills, as outlined below. Additional asbestos air or dust sampling should also be
conducted within the remaining areas not directly impacted by the Major Asbestos Spill to determine if
asbestos-containing dust/debris has spread to adjacent areas. If asbestos fibers are found within any
other areas or on building contents, they should be included in the scope of professional abatement and
decontamination. The following response actions must be followed per Colorado Reg. 8 when a Major
Asbestos Spill occurs:
• Restrict access to the area and post warning signs to prevent entry to the area by persons other
than those necessary to respond to the incident.
• Shut off or temporarily modify the air handling system to prevent the distribution of asbestos
fibers to other areas.
• Immediately contact the Division by telephone, submit a notification in compliance with
subsection III.E. (Notifications) and, if in an area of public access, apply for a permit in accordance
with subsection III.G. (Permits).
• Be exempted from the requirements to have a certified Supervisor on-site at all times, until such
time as the immediate danger has passed. Any cleanup or asbestos abatement that must occur
after the immediate danger has passed shall be supervised by a person certified by the Division.
• Using certified Supervisors and certified Workers in accordance with section II. (Certification
Requirements) of this Regulation, seal all openings between the contaminated and
uncontaminated areas and establish none-detect air pressure within the contaminated area in
accordance with paragraph III.J. (Air Cleaning and None-detect Pressure Requirements). This is to
be accomplished using polyethylene sheeting to cover areas such as doorways, windows, elevator
openings, corridor entrances, grills, drains, grates, diffusers and skylights.
• HEPA vacuum or steam clean all carpets, drapes, upholstery, and other non-clothing fabrics in the
contaminated area, or discard these materials.
• Launder or discard contaminated clothing in accordance with subsection III.R. (Waste Handling).
• HEPA vacuum or wet clean all surfaces in the contaminated area.
• Discard all materials in accordance with subsection III.R. (Waste Handling).
• Following completion of subparagraph III.T.1.a. through III.T.1.i. above, comply with air
monitoring requirements as described in subsection III.P. (Clearing Abatement Projects); air
samples shall be collected aggressively as described in 40 C.F.R. Part 763, Appendix A to Subpart
E(EPA 1995), except that the air stream of the leaf blower shall not be directed at any friable ACM
that remains in the area and
• Comply with any other measures deemed necessary by the Division to protect public health.
11.0 Disclaimer & Limitations
The activities outlined in this report were conducted in a manner consistent with a level of care and
expertise exercised by members of the environmental consulting and industrial hygiene profession. All
activities were performed in accordance with all applicable federal, state, and local regulations as well as
generally accepted standards and professional practice. No warranty is either expressed or implied. DSC
assumes no responsibility or liability for error in public information utilized, statements from sources
other than DSC, or developments resulting from situations outside the scope of this project.
The details provided within this report outline the inspection activities on the date(s) indicated and
should not be relied upon to represent conditions at a later date, the limited number of bulk-samples
collected, and the laboratory results of those bulk-samples. The laboratory results contained in this
report apply specifically to the materials in which bulk-samples were collected. The results do not
include or apply to any other materials within the structure that were not sampled, but may contain
asbestos; including materials that may be hidden or inaccessible. Additional inspection and bulk-
sampling activities would be required to determine if any other materials contain asbestos.
This report has been prepared on behalf of and exclusively for use by the Client, with speci�c application
to their project as discussed in the scope of work. The results of any surfacing material indicated in this
report also includes any associated overspray of that material, e.g., under carpet, above suspended
ceilings, etc. The information contained in this report is intended as supplementary material for
abatement design and is not to be used as the scope of work for abatement activities, bidding or billing
purposes. Contractors or consultants reviewing this report must draw their own conclusions regarding
8
further investigation or remediation deemed necessary. DSC can provide a full scope of work for
abatement upon request. DSC does not warrant the work of regulatory agencies, laboratories or other
third parties supplying information which may have been used in the preparation of this report.
0
APPENDIX A
INSPECTOR & FIRM ASBESTOS CERTIFICATES
�
,...,:•e r,'�.o.:`?z.: �rr:,xC•5�� ..w��i;�'�i�'.f ..._...��.r`+`�.---- r.�..a,.. .....:;,�:`�r..... _.. ��
��, �� -"M'qa,•-,}�'tly.<<3"" 't�7.yG'-?a_.=- --�-.,�.`F _-' '
�� � � _ � . y. _'. � �. � ,. . ..-- . . "'•,.... ... - � : .' . , .
��� ��v STATE OF COLORADO
,¢ �r� as�sTOs
��� � �
��� �:�,,�- � �*
C�R7.7FICATIO
G�,,,�.. � `� .
��'f,'��- .
°�,�, �- � Colpratlo Departr»ecR of Public'Heait6
�' �.-� and Favirotvnent `;:
,�� . ,
�'�• Air Pollution Control Division
J� � k ;
F ��.
ti��� _ �* �- f �� f
�; 'x+rF fif This certifies thaz "'+�,�
r �i; � � � .
� � Edie Stevenson
� : v : ;. �
� ; ' , t `�`�'
t�� -�,� , � Certifieatioa Na�18�106
�� ?o " ' •.,'::
�'��.'` � has met the requirements of 25-7-507, C.R.S. and Air Quality Control
� Commission Regulation No:'8, Part B, and is hereby certified by We
�, state of Colorado in the following disciptine:
r''� � � , � �_
� ���� ` � Buj�diag iaspe�tor*.,�:
, •�
� t�� Issaed: 6f17R011 ,.� ��; r, .
��l � Eipiret oo: 6l17r1612 � - -
;��� �
�`��-�
s °t.
: 4�u'-'.'
� ,_ i�_.� � {�a
� '1%VO/�dblfl�%MId�Yff//�I�i/II�f����A\/I�%Y(OI�!
� ie�fwbWi��F�.r�e1�4/W'e
,�v�`�� � .. , .� _ �N ..
�i�i ` ,... � .. �. . _
; ♦ ' r--�'��='u•'�py'w'b_' '."'}n: "..' ��.....:-.a. ��i_'i-_c..y
..u�. ,. �'SB.��-�f .fF 91�. . ..JY ��1... .1P i_ .. � . Y
�, � ._:.vF�, .. �,s,:�a+a�'. �. :-,,�ny.+J,.. �.`
STATE OF COLORADO
ASBESTOS CONSULTING FIRM
Coloredo Depxrtmrnt of Pubtic Health
mtd E:nvirpnmrnt
Air PoHution Comrol Uivision
��f �
�� '.
'� �i � This cMefies [hat � � �.
� �� � 4
-�� ? DS ConsulNng, Inc. �`
Rq�isstratioo l�o. ACF - 1 �912
. ,;,,: regi�traci�n rcqwrcmcpts of 25-1.507, C.It.S. and the Air-Quslity Coatrol
�.,���nu..,�on Regulatioat!��- & Prrt l3, md is herCby aWborized to pe{furn� ssbeatas coasniting
�ct�vities asieq d yadEr:Regulstws#a E ParCE,$,� in:ike�state;6f Colorado.
� � �— � .
. , '
1 �
. � .
r f,
i . . �i lanusty 30 20T2 _ �—"",/ �y.�"/� ���,,,///���
.�._ . �(f' y/i�`�$�y/. � Y,.([[[r/.� �
. 1�?:f'c'� �3li:i:1`� . �(�'� : Y% _j (.�� � .. ..0 1Ls ` i
� � '�'�� .. f� . �111M�MM�CG�iw�Y+1/n
�.. , i
_ a�un. _�-� ,
�
APPENDIX B
.�. � . �. .
. , ._ . .
12
AFRi7I71(7IlAC"�y LAtK)RATOR)/
.�tiS(X_:IATFS, INC:<>17N()F2AtH�
� C�e�
Certi�cate of Analysis
13949 W, Colfax Ave
Suite 205
Lakewood, CO 80401
303.232.3746
www.aerobiolo9Y net
Client Name DS Consulting �����so Date Collected: OS/18/12
Street address 5366 Flatrock Ct � Date Received: OS/18/12
Ciry, State ZIP Morrison, CO R0465 Date Analyzed: OS/23/12
Attn: I:die Stevenson & Ste�e ShurtlitT NvLnP Lab Code 200860-o Date Reported: OS/24/12
Client Project Name: 450 d 2 Spiuce Way, Vail Project ID: 12005719
Job ID: Amended Report
Test Requested: 3002, Asbestos in Bulk Samples
Method: Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA-600/R-93/116, July 1993.
Sample Identification Homo- Layer Non-Asbestos Non-Fibrous Matrix
Physical Description of Sample/Layer geneous Asbestos Detected Asbestos Percentage Fiber Material Material
Client Lab Sam le Number �y�,� Percentage Percenta e Percenta e Com osition
12005719-1A White Texture w/Pink Paint N 15% CHRY 3 5 92 C
DW 1-1
1200�719-1B Tan/White Drywall N 8�% ND 10 90 G
12005719-2A w'hite Texture w/Pink Paint N 15% CHRY 2 8 90 C
DW 1-2
12005719-2B Tan/White Drywall N 8�% ND 10 90 G
12005719-3A White Texture w/I'ink Paint N 25% CHRY 3 3 94 C
DWl-3
12005719-3B I'an/White Drywall N 7�% ND 10 90 G
12005719-4A White Compound N 25% ND 2 98 C
DW2-1 12005719-4B White Compound N 35% ND 2 98 C
12005719-4C White Tape N 40% ND 99 1
DW2-2 12005719-5 Tan/White Drywall w/White Paint N 100% ND 10 90 C
�� ��ia?��_
0�
R�c ard Wegrzyn
I.aboratory Analyst
Page 1 of 3
A = Amosite
AC = Actinolite
�// AN = Anthophyllite
/�'�°�� CHRY=Chrysotile
CR = Crocidolite
TR = Tremolite
Paul Knappe Trace=Less Than 1%
Asbestos Laboratory Supervisor ND=None Detected
13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.2323746
Q = Quartz P = Perlite
C = Carbonates B = Binder
G = Gypsum D=Diatoms
M = Mica
T=Tar
NTR = Non-Asbestiform TR
NAC = Non-Asbestiform AC
f�FRCAh1AI(7C��/ LAI7CIRATC7Ry
A'iS( x:L41 t4. INt.:( N2N(. )I?Ai t=� )
3�s�-+�F C.M�iwsG
Certificate of Analysis
13949 W, Colfax Ave
Snite 205
Lakewood, CO 80401
3032323746
www.aerobiolo9Y net
Client Name DS Consul[ing ������o Date Collected: OS/18/12
Street address 5366 Flatrock Ct � Date Received: OS/18/12
City, State ZIP Morrison, CO 80�65 Date Analyzed: OS/23/12
Attn: Edie Stevenson & Steve Shurdiff NVLAP Lab Code 2o08GO-o Date Reported OS/24/12
Client Project Name: �50 N2 Spruce Way, Vail Project ID: 12005719
Job ID: Amended Report
Test Reqoested: 3002, Asbestos in Bulk Samples
Method� Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA-600/R-93/ll6, July 1993.
Sample Identification Homo- Layer Non-Asbestos Non-Fibrous Matrix
Physical Description of Sample/Layer geneous Asbestos Detected Asbestos Percentage Fiber Material Material
Client Lab Sam le Number �Y�N� Percentage Percenta e Percenta e Com osition
12005719-6A Tan Wall Covering N 4% ND 50 50
DW2-3
12005719-6B White/Tan l�rvwall w/White Paint N 96% ND l� 85 G
����,���
R�chard Wegrzyn
Labora[ory Analys[
Page 2 of 3
A = Amosite
AC = Actinolite
���/�`"—"d'/ AN = Anthophyllite
CHRY=Chrysotile
CR = Crocidolite
TR = Tremolite
Pau Knappe Trace=Less Than 1%
Asbestos Laboratory Supervisor ND=None Detected
13949 W. Colfar Ave. Suite 205, Lakewood CO 80401, 3032323746
Q = Quartz P = Perlite
C = Carbonates B = Binder
G = Gypsum D=Diatoms
M = Mica
T=Tar
NTR = Non-Asbestiform TR
NAC = Non-Asbestif'orm AC
�
Ac�zobioloc�y l.�abo�aro�zy
ASS()C.;IAIES, INLUI2F'L)!?AlE[�
�YOLNf �lsif
Certificate of Analysis
Client Name DS Constdting ��
Street address S;GG Fiatrock Ct ���Q�
City, State ZIP Morrison, CO 8046�
Attn: Steve Shurtliff & Fdie Stevenson NVLAP Lab Code 200860-0
Client Project Name: 4506 #2 Spn�ce Way
Test Requested 3002, Asbestos in Bulk Samples
Method: Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA-600/R-93/116, July 1993.
13949 W. Colfax Ave
Suite 205
Lakewood, CO 80401.
3032323746
www aerobioloav.net
Date Collected: OS/24/12
Date Received: OS/25/12
Date Analyzed: OS/25/12
Date Reported: OS/25/12
Project ID: 12006001
Job ID:
Sample Identification Homo- Layer Non-Asbestos Non-Fibrous Matrix
Physical Description of Sample/Layer geneous percentage Asbestos Detected Asbestos Percentage Fiber Material Material
Client Lab Sam le Number Y/N Percenta e Percenta e Com osition
12006001-1A White Compound N 5% NU 100 C
DWl-1 12006001-1B Tan/White Drywall N 10°/o ND 10 90 G
12006001-1C Beige Wall Covering N 85% ND 50 50
12006001-2A 7an/White Drywall N 5% ND 50 50
DWI-2 12006001-2B White Compound N 5% ND 100 C
12006001-2C Beige Wall Covering N 90% ND 50 50 G
12006001-3A Tan/White Drywall w/White Paint N 50% ND 50 50 G
DW 1-3
]2006001-3B Beige Wall Covering N �0% ND 50 50
MM1 12006001-4 White Texture w/White Paint N ]00% ND l00 C
A = Amosite
AC = Actinolite
�� C�'�_ _ _� ���/���� AN = Anthophyllite
� � 1 CHRY=Chrysotile
CR = Croc�dolite
TR = Tremolite
ic ar egrzyn au nappe Trace=Less Than 1%
Laboratoty Analyst Asbestos Laboratory Supervisor ND=None Detected
13949 W. Colfax Ave. Suite 205, Lakewood CO 80401, 303.232.3746
Page 1 of 2
Q = Quartz P = Perlite
C = Carbonates B = Binder
G = Gypsum D=Diatoms
M = Mica
T=Tar
NTR = Non-Asbestiform TR
NAC = Non-Asbestiform AC
AFRA�7►1<?I(7C'�y LA�70RATOfY)/
AtiSt X.:L4TFS. INC :<7liN()!?A.iF��
� C.�sb
Certificate of Analysis
Client Name DS Consultm@ ��n � ^�o
Street address 5366 Flatrock Ct � ��J
City, State ZiP Murrisoq CO 80465 U
Attn: Sle��e ShUrtliff NVLAP Lab Code 2008G0-0
Client Project Name: 4506 Spruce Way, Unit 2, Vail, CO
Test Reques�ed: 3002, Asbestos in Bulk Samples
Method Polarized Light Microscopy / Dispersion Staining (PLM), Method for the Determination of Asbestos in Bulk Building Materials. EPA-600/R-93/116, July 1993.
13949 W. Colfax Ave
Suite 205
Lakewood, CO 80401
303.2323746
www.aerobio�gqv net
Date Collected: OS/24/12
Date Received: OS/29/12
Date Analyzed: OS/29/12
Date Reported: OS/29/12
Project ID: 12006068
Job ID:
Homo- Non-Asbestos Non-Fibrous Matrix
Sample Identification Layer
Physical Description of Sample/Layer geneous Asbesros Detected Asbestos Percentage Fiber Material Material
Client Lab Sam le Number ��,�N� Percentage
Percenta e Percenta e Com osition
12006068-1A White Tapc N 30% ND 95 �
SMCI-1 12006068-1B White Texture w/Cream Paint N 30% ND 100 C
12006068-1C White Joint Compound N 40% ND l00 C
12006068-2A White Tape N 30% ND 95 �
SMCI-2 12006068-2B White Texture w/Cream Paint N 30% ND 100 C
12006068-2C White Joint Compound N 40% ND ] 00 C
12006068-3A White Tape N 30% ND 95 �
SMC1-3 12006068-3B White Texture �v/Cream Paint N 30% ND 100 C
12006068-3C White Joint Compound N 40% ND l00 C
A = Amosite
AC = Actinolite
/�� C�'a_ _ _� ���/�/� AN = Anthophyllite
�f ��1 �---��i CHRY=Chrysotile
� � (/ � CR = Crocidolite
TR = Tremolite
Richard Wegrryn Paul Knappe Trace=Less Than 1%
Laboratory Analyst Asbestos Laboratory Supervisor ND=None Detected
Page 1 of 2 13949 W. Colfa�c Ave. Suite 205, Lakewood CO 80401, 3032323746
Q = Quartz P = Perlite
C = Carbonates B = Binder
G = Gypsum U=Diatoms
M = Mica
T=Tar
NTR = Non-Asbestiform TR
NAC = Non-Asbestiform AC
DS Consulting, Inc.
Final Clearance Air Monitoring Report
4506 Spruce Way, Unit #2, Vail, Colorado
Presented To:
Mr. Scott Tash
Mr. Wes Worley
ALM Environmental Services
7763 Webster Way
Arvada, CO 80003
Performed & Prepared By:
Mr. David Sinkbeil
DS Consulting, Inc.
5366 Flatrock Crt.
Morrison, CO 80465
(720) 201-6611
Project Details:
DSC Project Number: 897
Conducted: May 30, 2
EXECUTIVE SUMMARY
On May 30, 2012, Mr. David Sinkbeil with DS Consulting, Inc. (DSC) conducted a final visual inspection,
performed aggressive clearance air monitoring, and analyzed clearance air-quality samples via Phase
Contrast Microscopy (PCM) for an asbestos abatement project within the single-family condominium
residence located at 4506 Spruce Way, Unit #2, Vail, Colorado.
Services were provided at the request of Mr. Scott Tash with ALM Environmental, Inc. in support of
asbestos abatement activities being conducted to remove approximately 170 square feet of friable
drywall/texture (surfacing materials) from the 2nd level and loft containment area. This project was a
homeowner opt-out abatement project. Mr. Sinkbeil performed a final visual inspection along with
aggressive clearance air monitoring and analyzed five (5) clearance air-quality samples via Phase
Contrast Microscopy (PCM) from a full containment encompassing the abatement area on May 30, 2012.
Monitoring locations and frequencies were determined by Mr. Sinkbeil having EPA and State of Colorado
accreditation No. 13015. PCM analysis was also performed by Mr. Sinkbeil (see Appendix B for
certification).
DSC's scope of work for this project included performing a final visual inspection and collection and
analysis of aggressive final air quality samples by NIOSH 582-trained personnel for determination of
airborne asbestos (as total fibers) concentrations in identified areas. DSC is a participant in the Industrial
Hygiene Proficiency Analytical Testing (IHPAT) program with laboratory ID No. 188987 and has a rating
of Proficient. The abatement project passed the final visual inspection and the analytical results of all five
(5) PCM samples collected were below the clearance criteria of 0.01 fibers/cubic centimeter (f/cc) (see
Appendix A forAir Sam ple Analysis).
PROJECT INFORMATION
• General Abatement Contractor (GAC)
ALM Environmental, Inc.
• GAC Project Supervisor
Mr. Anthony Arellano
• Project Location
4506 Spruce Way, Unit #2
Vail, CO
� Project Contact
Mr. Scott Tash
2
� Air Monitoring Specialist/Analyst
Mr. David Sinkbeil
• Date Conducted
May 30, 2012
• Final Clearance Sample Results
See Appendix A
• Certifications
See Appendix B
PROJECT INTRODUCTION
On May 30, 2012, Mr. David Sinkbeil with DS Consulting, Inc. (DSC) conducted a final visual inspection,
performed aggressive clearance air monitoring, and analyzed clearance air-quality samples via Phase
Contrast Microscopy (PCM) for an asbestos abatement project within the upper level and loft level of the
single-family condominium residence located at 4506 Spruce Way, Unit #2, Vail, Colorado.
Services were provided at the request of Mr. Scott Tash with ALM Environmental, Inc. in support of
asbestos abatement activities being conducted to remove approximately 170 square feet of friable
drywall/texture (surfacing materials) from the 2nd level and loft containment area. This project was a
homeowner opt-out abatement project. Mr. Sinkbeil performed a final visual inspection along with
aggressive clearance air monitoring and analyzed five (5) clearance air-quality samples via Phase
Contrast Microscopy (PCM) from a containment encompassing the abatement area referenced above on
September 30, 2011. Monitoring locations and frequencies were determined by Mr. David Sinkbeil;
having EPA and State of Colorado accreditation No. 13015. PCM analysis was also performed by Mr.
Sinkbeil (see Appendix B for certifications).
SCOPE OF WORK
DSC's scope of work for this project included performing a final visual inspection and collection and
analysis of aggressive final air quality samples by NIOSH 582-trained personnel for determination of
airborne asbestos (as total fibers) concentrations in identified areas. DSC is a participant in the Industrial
Hygiene Proficiency Analytical Testing (IHPAT) program with laboratory ID No. 188987 and has a rating
of Proficient. The abatement project passed the final visual inspection and the analytical results of all 5
PCM samples collected were below the clearance criteria of 0.01 fibers/cubic centimeter (f/cc) (see
Appendix A forAir Sam ple Analysis).
AIR MONITORING
Air-quality samples were collected utilizing a modified NIOSH 7400 Method, whereby samples were
collected on 25-millimeter (mm) mixed-cellulose, ester-membrane filters with 0.45-micron pore size and
analyzed via Phase Contrast Microscopy (PCM) as per the customer's requirements.
Sample Collection - PCM samples, when applicable, were collected on 25-millimeter (mm) mixed-
cellulose, ester-membrane filters with 0.45-micron pore size with an effective collection area of 385 mm.
All filters were pre-assembled by the manufacturer in three stages, conductive sampling cassettes with
extension cowls.
Air samples were collected at an average flow rate 12.5 liters per minute (L/m) using Thomas high-
volume pumps with a minimum of 1,200 liters being collected. Flow rates were collected at the
beginning and at the end of the sampling period utilizing an airflow rotameter calibrated against a
primary-flow calibration instrument. Start times and stop times were recorded for all sampling periods.
A field blank and lab blank were also collected and analyzed along with the five (5) clearance samples.
PCM Sample Analysis Method - PCM samples were analyzed according to a modified NIOSH 7400
Method—A Counting Rules—although samples were collected on 25-mm mixed-cellulose, ester-
membrane filters with 0.45-micron pore size and analyzed via PCM. Air sample results contained in this
report have been calculated with blank sample corrections.
3
APPENDIX A- AIR SAMPLE RESULTS
BRL = Below Reporting Limit of 0.002F/cc ND=None Detected
APPENDIX B
CERTIFICATIONS
F
�
G
��
V y
i
^o .��m
`ey�d �$ �" � ae0
e� � ��� � �"�
�C� � _ u �'
i 3�� � Z
� ��;
o,
z s�
w .� .
�� ���
� ����
0
����
STATE OF COLORADO
ASBES"FUS '� ��"
� ..�
CERTIFICATiO�i* '.�
�
�
'� � ,Colorado (kp9nimm of k'ubiic HadW . �!
7�
� uid Fnvironmcnt i� .�„�,
. �� •.. .� Air PollutionCmant Diwim `r � a sJ.J �
,«.'��,' . '�j '�..
°`+{ �: � This ccrtities `hat t„/ `
, -,� r David Slnkbeii i: �+•# �� '
�z..
Ccrlifleafion No: t301S �
^�, .
t �:
' ha met the requircmmmtx of 25-7•Str7. C.Ri. snd Aic Qu�liry ConVql ��. ,��
Commimtion lie�uletion No. $ PaR $. and is �reby cau6ed by tlx ;��
-. aime of l:olpndo in du followinQ discipNne: �: ;�
Afr Monhorieg SpeciaU4lt'`
�w.a: �rsuzai
Ecpiw w: 7ItS401 S �
._ Y_,. ii�'.'i,�
f...CC. �f%�
�MrMMiw�b+.+�.
• IY siykr� �u�.O.r r.I+�+•N�urw.iM.Yr.pww+�.ry.av
n+qYir' Y Je �t}4e yaqHf�na
5
0
�
��_
.,.�,.5,...�.o.:`.i�sn°�s".;ee e a a "'°i,�,in°.°'f ::. .,
. . . . . . . . , „ ,. ,!:�? ,p � . . . . . . .. . . , . . _ . � :'} . ,L� . �� G:�� . . . . , �htf� 0 . f,t,i, r,i� � . CJ� U. , > >V. � � . . Halr. .. . . ,l4 —; u -
, - � � STATE QR �-�OLORAD� � �
� -. _
ti.�- � �.�iti�./�� ..i � �✓ �� � � - •,��, �. .
�. � ti ��:✓'`�ti .�.«� , :.. - . � .� .. . _ .
' . �/\�`-��.,�^~•J'\/\ :_.. ...� .;. _ . /.ti`j� ..���%`l \�\i.
,...
\� .�%� � ...� . "',. . � ':..' , - . . _ \/ . ..� \�'J '�. %'t 1 .
�
, � � `ti�W/�.�f\`� ../,..�_._• . _ . � . . �`�. i.,wJ�� .,L�/ \�.-.`_. � ��
\ \ �./�� �. '�.. ' � �.- ..,. . . � . ., /-� . ��` 'r.. f
\... � �\:� �
'i t - , , , �-
'� � "; " ASBESTO� C(JN��ULTING �IRM
'�, �'\..''��,.�- �v ti �� rr
\� `,i ��.:. . J,"� / �-'"\ �� i � i ..
• ��-� � � � ':� .� i.
, "�.i .� �..:' � _. - _ , . .. . . . .. .. r �: ,� �. f !, .
�
"� `„"/�'\.�''_`....+�1,��"� . . .. _ _. � �,."��-� -�,� � ' j � � � � �
� - � ' '�- ` � �G�olor�do Department of Pubiic F�ealth � `"� �\ � �
f ✓ ��, .. r� . .
R .. �/ ` � \ � \ 1���, �
. . \ . � ' . . `��-
� '. ��� /-�'� 's^ � �.. � ,.�. " � ' . '�''`,�` . � 'q � : '� � `� i"�. � � / �:
,�. �J f �✓ .,; ��, -� and Environment ' - ��; ,� -�; �, . �
1. �.I'�, � � . .. -+a. � ` � . . . . � �.. � .,� � . l \`,- -., "
�; �✓�,.-� �-�,, ..., ; 1 O l V �"`�•,, �
� ; ;--- � � --.;_ � �- , . Pollution Cont � 1 D' is�.on: � �;, �` ��,� _ �� �
� �� Air � - �;r -.
.-� . �
-• - �
� �: � �--�� �� , . � � .,. J�'f
.'`� `�. �� `.� .; ,. "�' \ ^. ,� J, _/`� 7
��\ /1..�.,��� 4 _:. � _. �� . _ . . +.: •�: � � '� .�.. .� ` ,
^� / � .; -.h... � . .: . ... . . . � � � - .'� %�,-'-� �� �,
r� r \ � � . C �. -�
�� ..;;._ � = :�` � ,��-'` ��'`,� T'his certif es that ,,� ;.��-.,�,� � ; `_;� -= .� ,- . �
v,
. � ,.� � _
x� _,. . � "i"� � .;i .�. '� � •. �i...'• . � ' .. . � .. ��.�. � � 'r^,^.�r � � i .�,i-\ . � / � �.� .
f ,
:. r,
. � "��.- . ' �. , _��� ,..�.. i,.^`_ , . . . �' � . . �� i � �... , �,,.`ti. �,�ti..: .
� -•r �. �.' � i � i � ..a � �� ;.- . . . _. . .: � � � '_, .�/,. ..i.�:..-� .`r` �-�,
.� ��' r`�'l � � ._;� �"'�'`-. � � '" � ~ '�- �' , � �, i'"'\�'�� �+�:�
_ � 2
� ;; ��;; _,�;-a, ,, � ,.�.- �. � -�;._ DS Consulting .:Inc. � � . .,� ;�`�. -
� .� � . ��� � � �
.�
_
_ � .-^ T +� � �� �:' -'� � : s ., �,-; � � .
'�-i �' � ,
� , � ;. �
l � � ;-.� � %'� � ^�,� � ��
S \ i .�-; y -'� :� r ti� '- :'.� _.=� . � � . �� ��. \ � - ` � -' � r � �.-�'� .s
� � ,, . � � " Regis , A�F ;:=1491Z-
` • � tratian IVo.
s �
� = -.. -
K \ _ _ ,. ` �
� : `:: ` = , ._ : � �
� \ has met the registrati�on requlrem�r�ts`of 2;5�-7-507„ C.R.�, ar�d' the Ai��Quality Control
� �; Cammission Regulation�No. 8,, Part B,'and is hereby autborized ta'�perform asbe�tos consulting
, . .
� � activities as•:required'urlder. �egutatton �+To•S, Pari_B; inthe state �f Coloradv. -
, _ ,
; �, ; :.: . � :
� . _
� �
� �r .��5" "� �: �t� . ...`y I � . J„� ._' . �
. . � / .\ � � �M.e, .' "� $�:�.4�' � \ w ;' \J �. \ •� � -.
������'+•�J � ;�^ f \� � � r �- ti..
Issued: January 30, 241� .� .. �, _ - ^ "` _
' �� .�-,�� �,;w ,, r' ; �:., �
� 3Q 201 �
Expires: January , 3 �� : `�` �;'��- ��' , - ; _ _ _ _ __ _ � ' �' _ _
: . -` �
"� �-� � ��� ' � ,'��,� Authorized APCD Representative' :x
�.
; � .� � �i-�`�'�. � � -� ,-!.:- i ` �� ..i r``��. ��, �.: �:' -� ' �'�r� ���-�" :: � �� �� � 4
,
' . .. ,, y _ ,,_. � ��
. .... ,
� �- .�-i. __ . . . - . , . , .... �-. � .
, �,
_ .
� �
, . � : f.` : ...
. . ,
. ., �� . �_ _' . , - . CX .. �. �
.. . � � SC�1� ,��.. , . ; � . . '. . .
.. . Y.... ..: � st�'3lf � t il - . �. . . , . -:, - , . . '[�
.ra:�.i- -t r ,.�-rtz � ..�i'zYA-•� :�.i �� . - 'rt � `n.:rlrhfr �-: r � -� t+ ri `n .rm 1� r.i:4rtY+i�ii
r �Pw. � "_ ��; ,• � . . . ..�, .. .
` : , 4� � �°rKi � -�'��•azrT -•;•- `� t �a�r�rt .*^ ` �-wn v��Y'w. ` 'cr."Tp?F'+r- t i- '�"`r"�''T'�»"� ] '��,T'x'�„'
!� • ��'7� �(j�
� �. �����.�..,.ti , .. .�<,.r�:l., �,;8:��. �' ��.: �`9,. � �*� � . . _•`= `::�t ..�,.7 �1 � �. .��:,, ..• .,,:�� _ . �.�.'7 �`'�'i � �.:�;,+! `_. i �:11 ��iS:�--�:?��� �"-�.� :���`,�. � +�.`� �f *"�' . °f�.� �-�7'�Z`'�'*--�'
.�`3:"y?�Iwa r3 �:oy.��s>r.:.��� Ah�r..,;"` aS-0.::;:'' .�¢�lssSrY����.�a�� o�yAB:�' .\'rsg� im'1R aeyh /;;,;�, p+� 9lF�,a41� -4,�7� �ao� rJ534ai�iit! �yr`•�r
� � '��" . ' ��..dra
. ... _<.�..__..._ _._.;. _.�. .:.,�.:6'; _ _' d •ii4e:.-' .'+.:.fd�r;�, �;s)k�R....�.
� .{
� Ski Country Construction, Inc
COA'S1h1C110A.1A(�.
PO BOX 9
Frisco, CO, 80443
970-668-9969
970-668-0548(Fax)
Client: Anne Robertson
Property: 4506 Spruce Way Apt 2
Vail, CO 81657
Operator Info:
Operator: MT
Estimator: Kenny Thaemert
Type of Estimate:
Date Entered: 5/25/2012
Price List: CORE7X MAY12
Labor Efficiency: Restoration/Service/Remodel
Estimate: ROBERTSON REBUILD P
Date Assigned:
Business: (970) 485-2629
The following is our estimate to perform water damage restoration work at 4506 Spruce Way Vail Colorado 81657.
Kenny Thaemert
Ski Country Construction
(970)485-2629
kenny @ skicountryconstruction.com
,�_ �� Ski Country Construction, Inc
� ��„�k« ��«>�. �����.
Po Box 9
Frisco, CO, 80443
970-668-9969
970-668-0548(Fax)
ROBERTSON_REBUILD_P
Main Level
Main Level
DESCRIPTION QNTY REMOVE
Taxes, insurance, permits & fees (Bid item) 1.00 EA 0.00
This figure is an estimate and will change depending on actual figures
Content Manipulation charge - per hour 16.00 HR 0.00
Labor to manipulate all contents throughout duration of job.
Dumpster load - Approx. 20 yards, 4 tons of 1.00 EA 52291
debris
Cleaning Technician - per hour 8.00 HR 0.00
Two Techs 4 hours each to perform thorough final construction clean upon completion of work.
Line item to match State Farm number 1.00 HR 0.00
Total: Main Level
Kitchen
:��
� � m
� �
19333 SF Walls
260.83 SF Walls & Ceiling
7.50 SY Flooring
24.17 LF Ceil. Perimeter
�
Missing Wall 9' X 8'
DESCRIPTION QNTY
Cabinetry - lower (base) units 11.42 LF
Cabinetry - upper (wall) units 17.00 LF
Countertop - Tile 36.00 SF
I/2" Cement board 36.00 SF
Ceramic Tile Floaring Installer - per hour 2.00 HR
Additional labor necessary to cut out sink into tile counter top
Trim board - l" x 4" - installed (hardwood - 18.00 LF
oak or =)
To install oak nosing around perimeter of counter top.
Stain & finish trim I 8.00 LF
Sink - double - Detach & reset 1.00 EA
ROBERTSON_REBUiLD_P
REMOVE
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
REPLA CE
1,000.00
49.20
0.00
53.11
-352.52
TOTAL
1,000.00
78720
522.91
424.88
-352.52
2,382.47
Height: 8'
67.50 SF Ceiling
67.50 SF Floor
24.17 LF Floor Perimeter
Opens into HALLWAY
REPLACE
163.15
121.19
20.06
3.34
82.00
4.09
1.31
125.09
6/21 /2012
TOTAL
1,863.17
�,060.23
722.16
120.24
164.00
73.62
23.58
125.09
Page: 2
,Si�i Ski Country Construction, Inc
���,��h�����r���. �����.
Po Box 9
Frisco, CO, 80443
970-668-9969
970-668-0548(Fax)
CONTINUED - Kitchen
DESCRIPTION QNTY REMOVE
REPLACE TOTAL
Garbage disposer - Detach & reset 1.00 EA 0.00 126.33 126.33
Refrigerator - Remove & reset 1.00 EA 0.00 44.41 44.41
Range - electric - Remove & reset 1.00 EA 0.00 57.93 57.93
Dishwasher - Detach & reset 1.00 EA 0.00 214.92 214.92
1/2" drywall - hung, taped, floated, ready for 128.69 SF 0.00 1.98 254.81
paint
Drywall Installer / Finisher - per hour 1.00 HR 0.00 89.31 8931
Additional labor to match texture to existing
Seal/prime then paint the walls and ceiling 260.83 SF 0.00 0.76 198.23
(2 coats)
Mask or cover per square foot 67.50 SF 0.40 0.00 27.00
Outlet or switch cover 5.00 EA 0.00 2.05 10.25
Totals: Kitchen 6,175.28
�I-3'8'�� S�I
�� � T
�i�
Q ! ;�, �
�g9 (
��o•r�
Missing Wall
DESCRIPTION
Entry/Foyer
216.00 SF Walls
272.57 SF Walls & Ceiling
629 SY Flooring
27.00 LF Ceil. Perimeter
4' X 8'
QNTY REMOVE
Height: 8'
56.57 SF Ceiling
56.57 SF Floor
27.00 LF Floor Perimeter
Opens into HALLWAY
REPLACE TOTAL
Carpet 68.67 SF 0.00 3.62 �8.59
Per ITEL
Carpet pad 56.57 SF 0.00 0.59 33.38
R&R 1/2" drywall - hung, taped, floated, 80.00 SF 0.40 1.98 190.40
ready for paint
Existing drywall installed over concrete wall has been compromised due to removal of wall paper. Re installation of wall paper over
this surface will not adhere properly and will bubble over time. Due to this drywall must be removed and replaced.
Drywall Installer / Finisher - per hour 1.00 HR 0.00 89.31 89.31
Additional labor to glue / install drywall on concrete wall with no nailing surface.
Paint baseboard heater 14.75 LF 0.00 5.44 8024
Wallpaper 216.00 SF 0.00 2.13 460.08
ROBERTSON_REBUILD_P 6/21 /2012 Page: 3
� Ski Country Construction, Inc
co�,rhi ci �o�, ���c.
Po Box 9
Frisco, CO, 80443
970-668-9969
970-668-0548(Fax)
CONTINUED - Entry/Foyer
DESCRIPTION QNTY REMOVE REPLACE TOTAL
Baseboard - 3 1/4" 51.00 LF 0.00 3.09 157.59
Paint baseboard - two coats 51.00 LF 0.00 1.19 60.69
Seal & paint acoustic ceiling (popcorn) 56.57 SF 0.00 1.02 57.70
texture
Totals: Entry/Foyer 1,377.98
F- tio' r -�
s� r T
�.d�„ ima.. v o
� ;�
3'8" '6"}-3'S �
r�„��
DESCRIPTION
Laundry Room
238.67 SF Walls
289.78 SF Walls & Ceiling
5.68 SY Flooring
29.83 LF Ceil. Perimeter
QNTY REMOVE
Height: 8'
51.11 SF Ceiling
51.1 l SF Floor
29.83 LF Floor Perimeter
REPLACE TOTAL
Interior door - Detach & reset - slab only 1.00 EA 0.00 20.99 20.99
1/2" drywall - hung, [aped, floated, ready for 58.32 SF 0.00 1.98 115.47
paint
Drywall Installer / Finisher - per hour 1.00 HR 0.00 8931 89.31
Additional labor to match texture to existing
Seal/prime then paint the surface area (2 1 19.33 SF 0.00 0.76 90.69
coats)
Mask or cover per square foot 51.11 SF 0.40 0.00 20.44
Washing machine - Remove & reset 1.00 EA 0.00 37.00 37.00
Dryer - Electric - Standard grade Detach and 1.00 EA 0.00 33.31 33.31
Reset
Casing - 2 1/4" 17.00 LF 0.00 1.75 29.75
Paint casing - two coats 17.00 LF 0.00 1.19 20.23
Totals: Laundry Room 457.19
ROBERTSON_REBUILD_P 6/21/2012 Page:4
Si�i Ski Country Construction, Inc
co�, rx� c uo�. �sr �.
Po Box 9
Frisco, CO, 80443
970-668-9969
970-668-0548(Fax)
� Living Room
�
- ��
- - ,�----
„t
!�
7T 3 -.{; F'
, 1T 9"-�
Missing Wall - Goes to Floor
DESCRIPTION
436.67 SF Walls
635.04 SF Walls & Ceiling
22.04 SY Flooring
57.50 LF Ceil. Perimeter
3'6"X6'8"
QNTY REMOVE
Height: 8'
198.38 SF Ceiling
198.38 SF Floor
54.00 LF Floor Perimeter
Opens into HALLWAY
REPLACE TOTAL
Carpet 424.34 SF 0.00 3.62 1,536.11
Per ITEL
Carpet pad 198.38 SF 0.00 0.59 117.04
1/2" drywall - hung, taped, floated, ready for 138.00 SF 0.00 1.98 273.24
paint
Drywall Installer / Finisher - per hour 1.00 HR 0.00 89.31 89.31
Existing drywall installed over concrete wall has been compromised due to removal of wall paper. Re installation of wall paper over
this surface will not adhere properly and will bubble over time. Due to this drywall must be removed and replaced.
Wallpaper 327.50 SF 0.00 2.13 697.58
Seal & paint acoustic ceiling (popcorn) 19838 SF 0.00 1.02 202.35
texture
Mask or cover per square foot 198.38 SF 0.40 0.00 7935
R&R Mirror - 1/4" plate glass 12.00 SF 0.27 12.33 151.20
To replace living room mirror which was removed and damaged during mitigation
Paint baseboard heater 14.75 LF 0.00 5.44 80.24
Totals: Living Room 3,226.42
2' 3" i ClOSet 2
T � 1 , s�c
I
� - ` .
�, �,
----1_-
f- 2' T' -I �rL
��c
DESCRIPTION
Carpet
Per ITEL
ROBERTSON_REBUILD_P
110.67 SF Walls
12025 SF Walls & Ceiling
1.06 SY Flooring
13.83 LF Ceil. Perimeter
QNTY
35.00 SF
REMOVE
'1 11
Height: 8'
9.58 SF Ceiling
9.58 SF Floor
13.83 LF Floor Perimeter
REPLACE
3.62
6/2] /2012
TOTAL
126.70
Page: 5
Si(x Ski Country Construction, Inc
co�srnrii�io�,���.
Po Box 9
Frisco, CO, 80443
970-668-9969
970-668-0548(Fax)
DESCRIPTION
Carpet pad
Totals: Closet 2
Stairs
��
CONTINUED - Closet 2
QNTY REMOVE
9.58 SF 0.00
REPLACE
0.59
TOTAL
5.65
132.35
Height: 17'
T �� 137.71 SF Walls 16.00 SF Ceiling
N
= � 153.71 SF Walls & Ceiling 43.75 SF Floor
�' 0 4.86 SY Floaring 22.05 LF Floor Perimeter
14.00 LF Ceil. Perimeter
e�„icw�
Missing Wall 3' X 17' Opens into HALLWAY
Missing Wall 3' X 17' Opens into LANDING
DESCRIPTION QNTY REMOVE REPLACE TOTAL
Carpet 98.50 SF 0.00 3.62 356.57
Per IT'EL
Carpet pad 43.75 SF 0.00 0.59 25.81
Step charge for "waterfall" carpet 20.00 EA 0.00 5.56 1 1 1.20
installation
SeaUprime then paint the surface area (2 137.71 SF 0.00 OJ6 104.66
coats)
Wallpaper 34.43 SF 0.00 2.13 73.34
Paint s[air skirUapron 22.05 LF 0.00 4.82 10628
To refinish stair skirt which incured damage from contents pack out as well as water mitigation.
Totals: Stairs 777.86
ROBERTSON_REBUiLD_P 6/2l/2012 Page:6
S�
co�.rx�crio�.i�<�.
Ski Country Construction, Inc
Po Box 9
Frisco, CO, 80443
970-668-9969
970-668-0548(Fax)
Landing
F- 5' T -�
5 3" ir
7 3" -� 3• c,
1
r »-
�-
Missing Wall
DESCRIPTION
145.83 SF Walls
156.83 SF Walls & Ceiling
1.22 SY Flooring
14.67 LF Ceil. Perimeter
3' X 17'
QNTY REMOVE
Height: 17'
1 1.00 SF Ceiling
1 1.00 SF Floor
14.67 LF Floor Perimeter
Opens into STAIRS
REPLACE TOTAL
Carpet 36.66 SF 0.00 3.62 132.71
Per ITEL
Carpet pad 1 1.00 SF 0.00 0.59 6.49
Seal/prime then paint the surface area (2 145.83 SF 0.00 0.76 110.83
coats)
Totals: Landing 250.03
�
g " � Hallway
� ----- ---------
�z•ri
! � � f ',
11' q' ��
�t4'11'�
Missing Wall
Missing Wall
Missing Wall - Goes to Floor
Missing Wall
147.33 SF Walls
205.90 SF Walls & Ceiling
6.51 SY Flooring
2433 LF Ceil. Perimeter
3' X 8'
4' X 8'
3'6"X6'S"
9' X 8'
Height: 8'
58.57 SF Ceiling
58.57 SF Floor
17.83 LF Floor Perimeter
Opens into STAIRS
Opens into ENTRY_FOYER
Opens into LIVING_ROOM
Opens into KITCHEN
DESCRIPTION QNTY REMOVE REPLACE TOTAL
Carpet 70.92 SF 0.00 3.62 256.73
Per ITEL
Carpet pad 58.57 SF 0.00 0.59 34.56
I/2" drywall - hung, taped, floated, ready for 1 18.00 SF 0.00 1.98 233.64
paint
Existing drywall installed over concrete wall has been compromised due to removal of wall paper. Re installation of wall paper over
this surface will not adhere properly and will bubble over time. Due to this drywall must be removed and replaced.
Drywall Installer / Finisher - per hour 1.50 HR 0.00 89.31 133.97
ROBERTSON_REBUILD_P 6/21/2012 Page:7
S� Ski Country Construction, Inc
��3�,�h<<�.�,.����.
Po Box 9
Frisco, CO, 80443
970-668-9969
970-668-0548(Fax)
CONTINUED - Hallway
DESCRIPTION QNTY REMOVE REPLACE TOTAL
Existing drywall installed over concrete wall has been compromised due to removal of wa(I paper. Re installation of wall paper over
this surface will not adhere properly and will bubble over time. Due to this drywall must be removed and replaced.
Wallpaper 118.00 SF 0.00 2.13 251.34
Paint baseboard heater 14.75 LF 0.00 5.44 80.24
Seal & paint acoustic ceiling (popcorn) 58.57 SF 0.00 1.02 59.74
texture
Totals: Hallway 1,050.22
Total: Main Level 15,829.80
1- 5' S" -�
4.,,• T
I
� �
�s•ir
a- �z'ri
�c
Bathroom
Second Level
201.33 SF Walls
239.03 SF Walls & Ceiling
4.19 SY Flooring
25.17 LF Ceil. Perimeter
Height: 8'
37.69 SF Ceiling
37.69 SF Floor
25.17 LF Floor Perimeter
DESCRIPTION QNTY REMOVE REPLACE TOTAL
R&R T- molding - for wood flooring 3.00 LF 0.38 5.45 17.49
Interior door - Detach & reset - slab only 1.00 EA 0.00 20.99 20.99
Totals: Bathroom 38.48
Master Bedroom
� ae��* 398.67 SF Walls
�� -" �--�- " 552.61 SF Walls & Ceiling
m
" 17.10 SY Flooring
m
t3' -' � 49.83 LF Ceil. Perimeter
� „�,•�
DESCRIPTION QNTY
Carpet 166.83 SF
ROBERTSON_REBUILD_P
Height: 8'
153.94 SF Ceiling
153.94 SF Floor
49.83 LF Floor Perimeter
REMOVE REPLACE
0.00 3.62
C7L►�IL►.LIIf►a
TOTAL
603.92
Page: 8
,Si�i Ski Country Construction, Inc
��",k�� �,�>�,��<.
Po Box 9
Friscq CO, 80443
970-668-9969
970-668-0548(Fax)
CONTINUED - Master Bedroom
DESCRIPTION QNTY REMOVE REPLACE TOTAL
Per ITEL
Carpet pad 153.94 SF 0.00 0.59 90.82
Interior door - Colonist - pre-hung unit 1.00 EA 0.00 152.55 152.55
Paint door slab only - 2 coats (per side) 2.00 EA 0.00 25.01 50.02
Paint door/window trim & jamb - 2 coats 1.00 EA 0.00 25.66 25.66
(per side)
Casing - 2 1/4" 34.00 LF 0.00 1J5 59.50
Door lockset - Detach & reset 1.00 EA 0.00 26.45 26.45
1/2" drywall - hung, [aped, floated, ready for 118.00 SF 0.00 1.98 233.64
paint
Existing drywall installed over concrete wall has been compromised due to removal of wall paper. Re installation of wall paper over
this surface will not adhere properly and will bubble over time. Due to this drywall must be removed and replaced.
Drywall Installer / Finisher - per hour 1.50 HR 0.00 89.31 133.97
Existing drywall installed over concrete wall has been compromised due to removal of wall paper. Re installation of wall paper over
this surface will not adhere properly and will bubble over time. Due to this drywall mus[ be removed and replaced.
Seal/prime then paint the surface area (2 140.00 SF 0.00 0.76 106.40
coats)
Mask or cover per square foot 153.94 SF 0.40 0.00 61.58
Outlet or switch cover 5.00 EA 0.00 2.05 10.25
Totals: Master Bedroom 1,554.76
�
- Linen Closet
-��
,. �
DESCRIPTION
64.00 SF Walls
67.56 SF Walls & Ceiling
0.40 SY Flooring
8.00 LF Ceil. Perimeter
QNTY REMOVE
Height: 8'
3.56 SF Ceiling
3.56 SF Floor
8.00 LF Floor Perimeter
REPLACE TOTAL
Carpet 10.42 SF 0.00 3.62 37.72
Carpet pad 3.56 SF 0.00 0.59 2.10
1/2" drywall - hung, taped, floated, ready for 67.56 SF 0.00 1.98 133.77
paint
Existing drywall installed over concrete wall has been compromised due to removal of wall paper. Re installation of wall paper over
this surface will not adhere properly and will bubble over time. Due to this drywall must be removed and replaced.
ROBERTSON_REBUILD_P 6/2l/2012 Page:9
$�i t� Ski Country Construction, Inc
coa„x� crio�.,�c.
Po Box 9
Frisco, CO, 80443
970-668-9969
970-668-0548(Fax)
CONTINUED - Linen Closet
DESCRIPTION QNTY REMOVE REPLACE TOTAL
Drywall Installer / Finisher - per hour 1.00 HR 0.00 89.31 89.31
Existing drywall installed over concrete wall has been compromised due to removal of wall paper. Re installation of wall paper over
this surface will not adhere properly and will bubble over time. Due to this drywall must be removed and replaced.
SeaUprime then paint the surface area (2 67.56 SF 0.00 0.76 51.35
coats)
Mask or cover per square foot 3.56 SF 0.40 0.00 1.42
Interior door - Colonist - pre-hung unit 1.00 EA 0.00 152.55 152.55
Paint door slab only - 2 coats (per side) 2.00 EA 0.00 25.01 50.02
Paint door/window trim & jamb - 2 coats 1.00 EA 0.00 25.66 25.66
(per side)
Casing - 2 1/4" 34.00 LF 0.00 L75 59.50
Door lockset - Detach & reset 1.00 EA 0.00 26.45 26.45
Organized closet shelving 13.33 SF 0.00 9.47 126.24
Totals: Linen Closet 756.09
�d� �- _.i Master Closet Height: 8'
16533 SF Walls
191.33 SF Walls & Ceiling
2.89 SY Flooring
20.67 LF Ceil. Perimeter
26.00 SF Ceiling
26.00 SF Floor
20.67 LF Floor Perimeter
DESCRIPTION QNTY REMOVE REPLACE TOTAL
Carpet 33.33 SF 0.00 3.62 120.65
Carpet pad 26.00 SF 0.00 0.59 15.34
Casing - 2 1/4" 34.00 LF 0.00 1.75 59.50
Paint casing - two coats 34.00 LF 0.00 L 19 40.46
Totals: Master Closet 235.95
ROBERTSON_REBUILD_P 6/2l/2012 Page:10
� Ski Country Construction, Inc
��„���:«�,,���, ��<�.
Po Box 9
Frisco, CO, 80443
970-668-9969
970-668-0548 (Fax)
.�
` s�iz �� � � Hallway
- t s.. 1zT, T
m �.�'�'7`
�-,s „-�
Missing Wall
Missing Wall
Missing Wall
Missing Wall
Missing Wall
258.67 SF Walls
31128 SF Walls & Ceiling
5.85 SY Flooring
33.00 LF CeiL Perimeter
8"X8'
1"X8'
3'4"X8'
1"X8'
1'8"X8'
Height: 8'
52.61 SF Ceiling
52.61 SF Floor
3233 LF Floor Perimeter
Opens into STAIRS
Opens into Exterior
Opens into Exterior
Opens into Exterior
Opens into Exterior
DESCRIPTION QNTY REMOVE REPLACE TOTAL
Carpet 68.00 SF 0.00 3.62 246.16
Carpet pad 52.61 SF 0.00 0.59 31.04
Drywall replacement per LF - up to 2' tall 10.00 LF 0.00 7.98 79.80
Drywall Installer / Finisher - per hour l.00 HR 0.00 8931 89.31
Existing drywall installed over concrete wall has been compromised due to removal of wall paper. Re installation of wall paper over
this surface will not adhere properly and will bubble over time. Due to this drywall must be removed and replaced.
SeaUprime then paint the surface area (2 129.33 SF 0.00 0.76 98.29
coats)
Mask or cover per square foot 52.61 SF 0.40 0.00 21.04
Totals: Hallway 565.64
�T
�
a
��
, T
. m
�
Stairs
��0 139.88 SF Walls
153.88 SF Walls & Ceiling
3.13 SY Flooring
� 9.50 LF Ceil. Perimeter
� I I
Missing Wall
Missing Wall
Missing Wall
DESCRIPTION
Carpet
ROBERTSON_REBUILD_P
S"X17'
2'4"X17'
3' X 17'
QNTY
69.34 SF
Height: 17'
14.00 SF Ceiling
28.13 SF Floor
12.19 LF Floor Perimeter
Opens into HALLWAY
Opens into Exterior
Opens into Exterior
REMOVE REPLACE TOTAL
U�III;
3.62
6/21 /2012
251.01
Page: 11
,S� 5ki Country Construction, Inc
COVtitRCC110\,1.\C.
Po Box 9
Frisco, CO, 80443
970-668-9969
970-668-0548(Fax)
CONTINUED - Stairs
DESCRIPTION QNTY REMOVE REPLACE TOTAL
Carpet pad 28.13 SF 0.00 0.59 16.60
Step charge for "waterfall" carpet 20.00 EA 0.00 5.56 11120
installation
Seal/prime then paint the surface area (2 139.88 SF 0.00 0.76 106.31
coats)
Mask or cover per square foot 28.13 SF 0.40 0.00 11.25
Totals: Stairs 49637
Total: Second Level 3,64729
�,r ,o---�
„� T
�s.-� �l
�m T,5
� ,� � _ . .
-- l� T
�1
DESCRIPTION
Loft
Third Level
512.00 SF Walls
658.42 SF Walls & Ceiling
16.27 SY Flooring
64.00 LF Ceil. Perimeter
QNTY REMOVE
Carpet 162.50 SF 0.00 3.62 588.25
Per ITEL
Carpet pad 146.42 SF 0.00 0.59 86.39
Casing - 2 1/4" 9.00 LF 0.00 1.75 15.75
Paint casing - two coats 9.00 LF 0.00 I.19 10.71
Drywall replacement per LF - up to 2' tall 7.00 LF 0.00 7.98 55.86
Drywall Installer / Finisher - per hour 1.50 HR 0.00 89.31 133.97
Labor necessary to match texture to existing
SeaUprime then paint the surface area (2 512.00 SF 0.00 0.76 389.12
coats)
Mask or cover per square foot 146.42 SF 0.40 0.00 58.57
Deck hand rail/guard rail - Labor only 10.00 LF 0.00 2131 213.10
Carpenter - Finish, Trim / Cabinet - per hour 4.00 HR 0.00 87.84 351.36
Labor to repair loft ladder which has experienced wear and tear from water mitigation and plumbing work. This also includes to reset
mechanical room door.
ROBERTSON_REBUiLD_P 6/21/2012 Page:12
Height: 8'
146.42 SF Ceiling
146.42 SF Floor
64.00 LF Floor Perimeter
REPLACE TOTAL
�
i�o.�vrxi cuo�, i�c.
Ski Country Construction, Inc
Po Box 9
Frisco, CO, 80443
970-668-9969
970-668-0548(Fax)
CONTINUED - Loft
DESCRIPTION QNTY REMOVE REPLACE TOTAL
Totals: Loft 1,903.08
Total: Third Level l ,903.08
Line Item Subtotals: ROBERTSON REBUILD P
Adjustments for Base Service Charges Adjustment
Carpenter - General Framer 166.46
Drywall installer/Finisher 357.24
Hardware Installer 158.16
General Laborer 49.20
Plumber 210.00
Tile/Cultured Marble Installer 164.00
Wallpaper Hanger I 50.18
Total Adjustments for Base Service Charges: 1,255.24
Line Item Totals: ROBERTSON_REBUILD_P 22,635.41
Grand Total Areas:
4,140.27 SF Walls
1, I 04.55 SF Floor
0.00 SF Long Wall
1,104.55 Floor Area
2,489.60 Exterior Wall Area
0.00 Surface Area
0.00 Total Ridge Length
1,062.68 SF Ceiling
122.73 SY Flooring
0.00 SF Short Wall
1,195.33 Total Area
28 I 21 Exterior Perimeter of
Walls
0.00 Number of Squares
0.00 Total Hip Length
5,202.95 SF Walls and Ceiling
512.34 LF Floor Perimeter
512.27 LF CeiL Perimeter
3,550.85 Interior Wall Area
0.00 Total Perimeter Length
ROBERTSON_REBUILD_P 6/2l/2012 Page:13
� Ski Country Construction, Inc
� ��„k� � �,�,�. ��<.
Po Box 9
Frisco, CO, 804�13
970-668-9969
970-668-0548(Fax)
Line Item Total
Total Adjustments for Base Service Charges
Material Sales Tax @ 7.900% x
Overhead @ 10.0% x
Profit @ ] 0.0% x
Replacement Cost Value
Net Claim
Kenny Thaemert
Summary
8,696.64
23,639.02
23,639.02
21,— 380 7
1, 55.24
687.03
23,322.44
2,363.90
2,363.90
$28,050.24
$28,050.24
ROBERTSON_REBUILD_P 6/21 /2012 Page: 14
02-22-2013 Inspection Request Reporting , U33V Page 11
4:02 pm Vail, CO - City Of T(2
Requested Inspect Date: Monday, February 25,20 3
Site Address: 4506 SPRUCE WY VAIL
Ridgeview Square Unit 2
A/P/D Information
Activity B12-0260 Type: COMBO Sub Type AMF Status: ISSUED
Const Type Occupanccy: Use Insp Area:
Contractor SKI COUNTRY CONSTRUCTION Phone 970-668-9969
Owner: ROBERTSON,ANNE
Description: WATER DAMAGE REPAIR DRYWALL PATCH WORK, PAINT,CABINETS, FLOORING INSTALLATION
Requested Inspection(s)
Item. 90 BLDG-Final Requested Time: 10:00 AM
Requestor Phone:
Comments FOLLO UP
Assigned To SGRFIER Entered By: JMONDRAGON K
Action Time Exp:
Inspection History
Item 30 BLDG-Framing
Item 50 BLDG-Insulation
Item 60 BLDG-Sheetrock Nail **Approved**
09/07/12 Inspector: nchand Action: AP APPROVED
Comment:
Item: 70 BLDG-Misc.
Item: 90 BLDG-Final
REPT131 Run Id: 15067