Revision Submittals:
1. "Field Set" of approved plans MUST accompany revisions.
2. No further inspections will be performed until the revisions are approved & the permit is re- issued.
3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance.
Permit #(s) information applies to: Attention: ( ) Revisions
( ) Response to Correction Letter
1 I - J Z.- attached copy of correction letter
j 4
( ) Deferred Submittal
1 ( ) Other
I
Project Street Address:
1 1 9 9_o5r \--L---
(Street) (Suite #)
Building /Complex Name: i4 C ; Descriptio / List of Changes:
L %
104-00 [2-- Mei '; i ( 0 t
Contractor Informatio
Coics) Business Name: �V`'�
w
r {
' Business Address: `
I
r I
City p ...-- State: � 0 Zip:
� �
1 Contact Name: `� Z�� s
• SS ,...--
Contact Phone: -390 + (use additional sheet if necessary)
I Contact E -M ai I : �O (A'\. 1/4 + � Uc' % Materials)
Revised ADDITIONAL Valuations (Labor &Mat )
r
cn (DO NOT include original valuation) I
I hereby acknowledge that I have read this application, filled out r
in full the information required, completed an accurate lot plan, F
q p p p � Building: $
and state that all the information as required is correct. I agree to
comply with the information and plot plan, to comply with all Town Plumbing: $
ordinances and state laws, and to build this structure according
to the towns zoning and subdivision codes, design review ap- Electrical: $
proved, International Building and Residential Codes and other .
ordinance : own applicable thereto. a Mechanical: $
x � A
Owner/Owner's Representative Signature (Required) Total:
O P 9 $ li I i
I
Applicant Information ._.. - -- - -- - -_ -- - -- -- -- -- 1 11, ,
Applicant Name: - 4-4 r Date Received:
Applicant Phone: 7_0 1 g /5
s V( C A hcantEMa�l. �`'�!�"1 GQ`i
PP
For Office Use Only:
Fee Paid: 1 J ‘,.,:', 6 L. i.: ,i..
Received From: '�
Cash Check # TOWN OF VAIL
CC: Visa / MC Last 4 CC # exp. date: - _
Auth #
1
114RM CONSULTANTS, INC.
(970- 949 -9391
P.D. Box 4572 FAX 949-1577
/AIL, COLORADO 81 658
RECORD
TO: Mr. Martin A. Haeberle
Chief Building Official
Town of Vail
Vail, CO
DATE: 6/22/2012 JOB NUMBER: 1204-23
PROJECT: Lopez Renovation
RFI MEETING NOTES X RESPONSE CLARIFICATION /CHANGE
The following are responses to the structural items to be addressed from the letter dated 6 -21 -12 from
Mr. Martin Haeberle of the Town of Vail building department.
Structural Sheet S1:
1) Please see revised comment on sheet S1, requiring special inspection for field welds.
Structural Sheet S2:
1) Snow retention is to be handled via snow clips placed on roof per manufacturer's recommendation and
engineer's review, see new note on roof plan, sheet S2.
2) N/A
3) Upper Floor plan on sheet S2 now shows outline of open trellis structure and general connection
instructions.
SIGNED: COPY TO:
6s /tab
Michael A. Hazard, AIA
Joe O'Malley, PE
REVIEWED: ` ,��,.•.v�' der
�. HEM •�' � I
•
y • • 1.
Tim D. Hennum, PE • •
34167 :
I • •
RR
w I No• • �r
i t v ••
Z z ��
Load calculation for Eiger Chalets Unit # 8
Existing 125 amp, 120/240 volt service
Existing:
1800sgftg3 watts/sq ft 5.4 kw
2 small appliance circuits g 1500 each 3.0
laundry circuit 1.5
ovens nameplate 8.4
dryer nameplate 5.5
washer nameplate 1.2
sauna nameplate 6.5
warming drawer 0.9
wine cooler 0.36
refrigerator 0.80
microwave 1.2
boot dryer 1.5
garage door 1.0
boiler 0.8
3 exhaust fans @ 1.0 amps each 0.30
125% of largest motor- garage door 0.25
Total load 38.61 kw
39 kw total
first l0kw @ 100% 10.0
remainder @ 40% 11.6
Total load of 21.6 kw divided by 208 volts = 104 amps existing
Addition of 210 sq ft @ 3 watts /sq ft = 630 watts
New load will be 39.24 kw
First l 0kw@ 100% = l 0kw
29.24 @ 40 %= 11.7
total new load 21.7 kw
21.7 divided by 208 = 104.33 amps
MICHAEL
HAZARD
ASSOCIATES
ARCHITECTURE
PLANNING
June 23, 2012 INTERIORS
Martin Haeberle
Chief Building Official
Town of Vail Building Department
75 South Frontage Road West
Vail, CO 81657
Re.: Permit B 12 -0234
Architectural Comment Responses
Sheet A1.0
• The Occupancy and building types have been added with
add' I reference to the 2009 IRC Section R302.2.2 Parapets
where parapets can be eliminated where "roof surfaces
adjacent to the wall or walls are at different elevations and
the higher roof is more than 30 inches above the lower roof.
The common wall construction from the lower roof to the
underside of the higher roof deck shall have not less than 1
hour fire resistance rating. The wall shall be rated for exposure
from both sides ".
Sheet A2.0
• The barbecue hood, motor and flue have been replaced
with prefabricated components designed specifically for use
with outdoor grills.
• Notes have been added identifying proposed United
Laboratories Fire Resistive Assemblies for new north and south
walls as well as new floor /soffit construction.
Sheet A3.0
• Property lines have been indicated on both elevations and
sections (see sheet A4.1) .
• The U value for new glazed doors and windows (U.29) has
been noted on the west elevation.