Loading...
HomeMy WebLinkAboutB12-0234 response to correction 062512 Department of Community Development '-,.. # 75 South Frontage Road T LYN 0 F VA 1 L ' Vail, CO 81 657 Tel: 970-479-2128 - _..r. J www.vailgov.com -Y Review w Coordinator [3eveloprnent Re e TRANSMITTAL FORM Revision Submittals: 1. "Field Set" of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved & the permit is re- issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. Permit #(s) information applies to: Attention: ( ) Revisions ( ) Response to Correction Letter 1 I - J Z.- attached copy of correction letter j 4 ( ) Deferred Submittal 1 ( ) Other I Project Street Address: 1 1 9 9_o5r \--L--- (Street) (Suite #) Building /Complex Name: i4 C ; Descriptio / List of Changes: L % 104-00 [2-- Mei '; i ( 0 t Contractor Informatio Coics) Business Name: �V`'� w r { ' Business Address: ` I r I City p ...-- State: � 0 Zip: � � 1 Contact Name: `� Z�� s • SS ,...-- Contact Phone: -390 + (use additional sheet if necessary) I Contact E -M ai I : �O (A'\. 1/4 + � Uc' % Materials) Revised ADDITIONAL Valuations (Labor &Mat ) r cn (DO NOT include original valuation) I I hereby acknowledge that I have read this application, filled out r in full the information required, completed an accurate lot plan, F q p p p � Building: $ and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town Plumbing: $ ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review ap- Electrical: $ proved, International Building and Residential Codes and other . ordinance : own applicable thereto. a Mechanical: $ x � A Owner/Owner's Representative Signature (Required) Total: O P 9 $ li I i I Applicant Information ._.. - -- - -- - -_ -- - -- -- -- -- 1 11, , Applicant Name: - 4-4 r Date Received: Applicant Phone: 7_0 1 g /5 s V( C A hcantEMa�l. �`'�!�"1 GQ`i PP For Office Use Only: Fee Paid: 1 J ‘,.,:', 6 L. i.: ,i.. Received From: '� Cash Check # TOWN OF VAIL CC: Visa / MC Last 4 CC # exp. date: - _ Auth # 1 114RM CONSULTANTS, INC. (970- 949 -9391 P.D. Box 4572 FAX 949-1577 /AIL, COLORADO 81 658 RECORD TO: Mr. Martin A. Haeberle Chief Building Official Town of Vail Vail, CO DATE: 6/22/2012 JOB NUMBER: 1204-23 PROJECT: Lopez Renovation RFI MEETING NOTES X RESPONSE CLARIFICATION /CHANGE The following are responses to the structural items to be addressed from the letter dated 6 -21 -12 from Mr. Martin Haeberle of the Town of Vail building department. Structural Sheet S1: 1) Please see revised comment on sheet S1, requiring special inspection for field welds. Structural Sheet S2: 1) Snow retention is to be handled via snow clips placed on roof per manufacturer's recommendation and engineer's review, see new note on roof plan, sheet S2. 2) N/A 3) Upper Floor plan on sheet S2 now shows outline of open trellis structure and general connection instructions. SIGNED: COPY TO: 6s /tab Michael A. Hazard, AIA Joe O'Malley, PE REVIEWED: ` ,��,.•.v�' der �. HEM •�' � I • y • • 1. Tim D. Hennum, PE • • 34167 : I • • RR w I No• • �r i t v •• Z z �� Load calculation for Eiger Chalets Unit # 8 Existing 125 amp, 120/240 volt service Existing: 1800sgftg3 watts/sq ft 5.4 kw 2 small appliance circuits g 1500 each 3.0 laundry circuit 1.5 ovens nameplate 8.4 dryer nameplate 5.5 washer nameplate 1.2 sauna nameplate 6.5 warming drawer 0.9 wine cooler 0.36 refrigerator 0.80 microwave 1.2 boot dryer 1.5 garage door 1.0 boiler 0.8 3 exhaust fans @ 1.0 amps each 0.30 125% of largest motor- garage door 0.25 Total load 38.61 kw 39 kw total first l0kw @ 100% 10.0 remainder @ 40% 11.6 Total load of 21.6 kw divided by 208 volts = 104 amps existing Addition of 210 sq ft @ 3 watts /sq ft = 630 watts New load will be 39.24 kw First l 0kw@ 100% = l 0kw 29.24 @ 40 %= 11.7 total new load 21.7 kw 21.7 divided by 208 = 104.33 amps MICHAEL HAZARD ASSOCIATES ARCHITECTURE PLANNING June 23, 2012 INTERIORS Martin Haeberle Chief Building Official Town of Vail Building Department 75 South Frontage Road West Vail, CO 81657 Re.: Permit B 12 -0234 Architectural Comment Responses Sheet A1.0 • The Occupancy and building types have been added with add' I reference to the 2009 IRC Section R302.2.2 Parapets where parapets can be eliminated where "roof surfaces adjacent to the wall or walls are at different elevations and the higher roof is more than 30 inches above the lower roof. The common wall construction from the lower roof to the underside of the higher roof deck shall have not less than 1 hour fire resistance rating. The wall shall be rated for exposure from both sides ". Sheet A2.0 • The barbecue hood, motor and flue have been replaced with prefabricated components designed specifically for use with outdoor grills. • Notes have been added identifying proposed United Laboratories Fire Resistive Assemblies for new north and south walls as well as new floor /soffit construction. Sheet A3.0 • Property lines have been indicated on both elevations and sections (see sheet A4.1) . • The U value for new glazed doors and windows (U.29) has been noted on the west elevation. Sincerely, P.O. BOX 1068 VAIL. COLORADO Michael A, Hazard AIA 81658 Michael Hazard Associates 970.949.4958 P 970.376.0066 C MHA @VAI L. N ET