Loading...
HomeMy WebLinkAboutB12-0271 Millrace Fire - Record ��� CONSULTANTS, INC. (970-949-939 1 � P.O. Box 4572 FAX� 949-1577 � VAIL, COLORADO B 1 658 RECORD � � iTO: Steve @ SRE Builders i I � � , DATE: 6/25/2012 JOB NUMBER: 1206-10 I ' PROJECT.• Millrace Fire - 6A & 6C I ! � ❑ RF/ ❑ MEET/NG NOTES � RESPONSE ❑ CLAR/F/CAT/ON/CHANGE � � � We were requested to visit the above referenced site to observe the structural damage caused by a fire. I ' entered both the second and third floors. The structural damage appeared to be limited to a few floor j joists and some floor sheathing above the exterior stairwell on the west side of the structure and to the � roof hip beam on the south side of the third floor. � The damaged floor joists shall be replaced with the same size I-joists and shall span the same distance - � from the cantilevered beam at the south west corner to the (2)-2x12 beam. Floor sheathing shall be � replaced to match existing depth. The roof hip beam, consisting of a 5 1/8 x 30 Glu-Lam, appears to � contain minimal damage (approximately 1/8" to 1/4" of overall width), and no reinforcing appears to be i required. However, we should be contacted to observe this beam once cleaning has been completed to i measure the remaining wood structure. , ; Please do not hesitate to call with any questions. � KRM Consultants, Inc. � I 1 i � �o�PpQ r�GjsT v �mamna, S/GNED: V�.���v "�.�v,�G�F�� COPY TO: s �,�G� � • • • ♦ i • • ' Tim D. Hennum, PE • • ,.Q s • I � s� •� , F A..o• �\�?., ; I REV/EWED: �ss��NAL,_�,����' ; t�l�I�? 2 5 2�12 I � � �