Loading...
HomeMy WebLinkAboutB12-0206 plansGENERAL NOTES: 2039 CHAMONIX LANE RAILING REPAIR JOB# 0306 -12 DESIGN CRITERIA: DECK RAILING (PER SEC. 1607.7 2009 IBC) 50 PLF IBC EDITION: 2009 STRUCTURAL WOOD FRAMING: 1. EXCEPT WHERE NOTED OTHERWISE, ALL 2" NOMINAL LUMBER EXCEPT STUDS SHALL BE DOUGLAS FIR -LARCH #2 AND BETTER. ALL SOLID TIMBER POSTS AND BEAMS 3" NOMINAL AND WIDER SHALL BE DOUGLAS FIR -LARCH #2 UNLESS NOTED OTHERWISE ON PLAN, 2. BOLTS USED IN FRAMING CONNECTIONS SHALL BE INSTALLED WITH STANDARD WASHERS AND NUTS. 3. REFER TO THE 2009 IRC TABLE R602.3(1) OR 2009 IBC TABLE 2304.9.1 FOR MINIMUM FASTENING SCHEDULE. A COPY OF THIS TABLE CAN BE PROVIDED UPON REQUEST. AS STATED IN SECTION 2304.9.5 OF THE 2009 IBC SECTION 2304.9.5: FASTENERS IN CONTACT WITH PRESERVATIVE - TREATED AND FIRE - RETARDANT- TREATED WOOD SHALL BE OF HOT - DIPPED ZINC - COATED GALVANIZED STEEL, STAINLESS STEEL, SILICON BRONZE OR COPPER. FASTENINGS FOR WOOD FOUNDATIONS SHALL BE AS REQUIRED IN AF &PA PWF 4. UNLESS NOTED OTHERWISE, STEEL CONNECTORS SHALL BE USED TO JOIN RAFTERS, JOISTS AND BEAMS SUCH AS SIMPSON STRONG -TIE CONNECTORS OR EQUIVALENT. CONNETORS THAT ARE USED IN EXTERIOR APPLICATIONS AND IN CONTACT WITH PRESERVATIVE - TREATED WOOD SHALL HAVE COATING TYPES AND WEIGHTS IN ACCORDANCE WITH THE TREATED WOOD OF CONNECTOR MANUFACTURERS' RECOMMENDATIONS OR IN ACCORDANCE TO IBC SECTION 2304.9.5.1, STRUCTURAL STEEL: 4. OBSERVATION VISITS BY THE STRUCTURAL ENGINEER ARE FOR DETERMINATION OF GENERAL COMPLIANCE WITH THE CONSTRUCTION DOCUMENTS, THIS OBSERVATION VISIT IS NOT AN INSPECTION. THE CONTRACTOR SHALL CONTACT THE ENGINEER AT THE APPROPRIATE TIME TO SCHEDULE THIS VISIT. 5. IF NEW CONSTRUCTION ADJOINS AN EXISTING STRUCTURE, THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING DIMENSIONS, ELEVATIONS AND ALL EXISTING CONDITIONS. UNDERPINNING AND SHORING OF EXISTING STRUCTURES SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. CONSULT WITH THE ENGINEER FOR SHORING DESIGN AND RECOMMENDATIONS (NOT IN CONTRACT). 6. WHILE EVERY EFFORT IS MADE TO PROVIDE A COMPLETE AND ACCURATE SET OF CONSTRUCTION DOCUMENTS, ERRORS OR OMISSIONS MAY OCCUR. RELEASE OF THESE DRAWINGS ANTICIPATES CONTINUED COOPERATION AND COMMUNICATION BETWEEN THE CONTRACTOR, ARCHITECT AND ENGINEER TO PROVIDE THE BEST POSSIBLE STRUCTURE. CONNECTION SCHEDULE \L-'\ LUS28 luwn vai g REVIEWED FOR CODE COMPLIA Cl Date: By: Codes c' 1. ALL BOLTS USED IN STEEL FRAMING SHALL CONFORM TO ASTM SPECIFICATION A325. ANCHOR BOLTS AND BOLTS (INCLUDING LAGS) USED IN (E) - 2 x 8 TIMBER CONNECTIONS MAY BE ASTM A307. GENERAL REQUIREMENTS: 1. CHECK ALL DIMENSIONS AGAINST ARCHITECTURAL DRAWINGS PRIOR TO CONSTRUCTION. DO NOT SCALE DRAWINGS. CONTACT ENGINEER IF DISCREPANCIES IN DIMENSIONS ARE DISCOVERED. 2. THE STRUCTURAL DRAWINGS DESCRIBE THE COMPLETED STRUCTURE. THESE DRAWINGS HAVE BEEN PREPARED FOR THE USE OF A QUALIFIED CONTRACTOR WITH EXPERIENCE IN THE CONSTRUCTION SYSTEMS AND TECHNIQUES DESCRIBED. THE CONTRACTOR SHALL PROVIDE ADEQUATE SHORING AND BRACING IN THE PROPER SEQUENCE, AS MAY BE REQUIRED TO ACHIEVE THE FINAL COMPLETED STRUCTURE. THE SEQUENCE OF CONSTRUCTION IS THE RESPONSIBILITY OF THE CONTRACTOR. CONSULT WITH THE ENGINEER FOR SHORING DESIGN AND RECOMMENDATIONS (NOT IN CONTRACT). 3. THE CONTRACTOR IS RESPONSIBLE FOR THE MEANS, METHODS SEQUENCES AND PROCEDURES FOR CONSTRUCTION OF THIS PROJECT. NOTIFY STRUCTURAL ENGINEER OF ERRORS OR OMISSIONS IN THE CONSTRUCTION DOCUMENTS IMMEDIATELY. DO NOT PROCEED UNTIL ERRORS OR OMISSIONS ARE RESOLVED. COORDINATE REQUIREMENTS FOR ALL PENETRATIONS THROUGH STRUCTURAL MEMBERS WITH STRUCTURAL ENGINEER. JOBSITE SAFETY IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. I I� II INDICATES EXISTING I BUILDING, TYP. — INDICATES EXISTING BEAM, TYP. INDICATES EXISTING COLUM, TYP. PROVIDE (N) -2x8 TO REDUCE — SPACING TO A MAX. OF 16" O.C. IF REPLACING EXSTG. DECKING WITH A COMPOSITE DECKING (VIF W/ MANUFACTURER) 0 � � r I� z I� Iw J L ABBREVIATIONS LIST ABV. ABOVE ADJ. ADJACENT ALT. ALTERNATE ARCH. ARCHITECT BLKG. BLOCKING BM. BEAM BRG. BEARING CANT. CANTILEVER CLR. CLEAR CONT. CONTINUOU EA. EACH EQ. EQUAL HDR. HEADER D HORIZ. HORIZONTAL INFO. INFORMATION INV. INVERTED JSTS. JOISTS MANF. MANUFACTURER O.C. ON CENTER R PLATE REF. REFERENCE SCHED. SCHEDULE T TRIMMER T.B. THROUGH BOLT T &G TONGUE & GROOVE TO TOP OF TRTD. TREATED TYP. TYPICAL VERT. VERTICAL VIF VERIFY IN FIELD W.P. WATERPROOF W/ WITH F- c �o r)- ter - OO LL I- w -I r ' -Ir r X z x N I C¢.) N co w ,EQ. ,EQ. I. w U JIL ! W JIL JIL W (E) - 2 x 8 1 S2 P 7NA � L�(RLD�GU \v/ FE JUN z i zu72 TOWN OF VAIL — (E) - 2x8 INDICATES NEW DECK RAILING > C O um u Q INDICATES NEW 44 NEWEL POST, TYP. 7 NJ DECK FRAMING PLAN SCALE: 1/4" = V-0 PI AN Nf1TFC- 1. NEW NEWEL POSTS NOT CONTINUOUS BELOW ARE INDICATED: ❑ 2, (E)- EXISTING FRAMING INDICATED AS THUS: (- — — - ) (N) -NEW FRAMING INDICATED AS THUS: 3. 0 INDICATES CONNECTION TYPE. REFERENCE SCHEDULE SHEET S1. 4. DO NOT SCALE DRAWINGS W N N X 00 00 U oZ a O Q O Il_ C) I­ r- M I- M 0 CD rnrn rnrn d c W m W O x Er z(-DQ Oz> LL = Q0 M oU0 CY-) LL] I— CV 0 N c 0 0 z w w z c� z P R O J E C T: 0306 -12 DRAWN BY: JPL REVIEWED BY: JPL D A T E : PERMIT 06.20.12 REVISIONS: GENERAL NOTES & DECK FRAMING PLAN si 0 rxoftwftft (19 (N) -(1) SCRE% 2x6 CF (2) -I NT POST 9 7 58 10 pCC�IE U WT JUN 21 2012 (N) -(2) -4x4 NE*Ef-FP_ ONE EA. SIDE OF (E)- 4x10 (N) -2x6 TOP CAP (N) -2x4 HORIZ. TOP & BOT OF VAIL (N) - #10 x 3" DECK SCREWS, TOP, BOT. & @ 8" O.C. TYP. @ FIRST PICKET (N) -1 112" x 1 112" PICKETS W/ 4" MAX. OPENING BTWN. PROVIDE 1 112" x 1 112" VERT. EA. SIDE OF (N) -4x4 NEWEL POST (N)- (2) - #10 x 2 1/2" DECK SCREWS, TOP & BOT. TYP. (N) -4x4 NEWEL POST TIGHT TO (E) -4x10 W/ (2) -5/8" O T.B.'s (IF 4x10 APPEARS TO BE ROTTEN PROVIDE A NEW 2x10 THE FULL LENGTH W/ FOUR ROWS OF 10d -NAILS ALONG LENGTH & ADD (2)- 3/16 "x6" TIMBER -LOK SCREWS) mi J I'll CD �C1 N - 00 O U OZ CL O Q o� � M Il- co O� O� 00 I,- r-_ 0 rn 2 d LLJ Iz gwo X rr —i z m < 0z> LL = Q o� z CD Cy-) W ♦- CV 0 0 z w w z 0 z P R O J E C T: 0306 -12 DRAWN BY: JPL REVIEWED BY: JPL D A T E : PERMIT 06.20.12 REVISIONS: DETAILS S2