Loading...
HomeMy WebLinkAboutSundial Unit A1 Legal.pdf B. TYPE OF REVIEW: / New Construction ($200 . 00) JMinor Alteration ($20 . 00) Addition ($50 . 00) Conceptual Review ($0) C. ADDRESS : 5D4 o me ;r, Co Z7P• / fr- D . LEGAL DESCRIPTION: LotiLoW ( U'1°14'- Block Subdivision Sutc.(;a( pt,Gpc. Z If property is described by a meets and bounds legal description, please provide on a separate sheet and attach to this application. E . ZONING: F . LOT AREA: If required, applicant must provide a current stamped survey showing lot area. G. NAME OF APPLICANT : t�U� n, 4-i` k-t4 Mailing Address : 50 it,O NilV-`� W (;o (r Uc„ ( Phone 4°76 H. NAME OF APPLICANT' S REPRESENTATIVE : _ && a Ok Mailing Address : Poco3c.i Oct;( RrbS Phone Tic( I . NAME OF OWNERS : Tbli ) /t1. r o ∎ HiCk Lcj *SIGNATURE (S) : c)' ""` t-id,fi f Mailing Address : 5'0110 ��n,atk Corr- D Ilr�,( � A 9 Phone J. Condominium Approval if applicable . K. DRB FEE: DRB fees, as shown above, are to be paid at the time of submittal of DRB application. Later, when applying for a building permit, please identify the accurate valuation of the proposal . The Town of Vail will adjust the fee according to the table below to ensure the correct fee is paid. 00 FEE PAID: $,-->6) - FEE SCHEDULE: VALUATION FEE $ 0 - $ 10, 000 $ 20 . 00 $ 10, 001 - $ 50, 000 $ 50 . 00 $ 50, 001 - $ 150, 000 $100 . 00 $150, 001 - $ 500, 000 $200 . 00 $500, 001 - $1, 000, 000 $400 . 00 $ Over $1, 000, 000 $500 . 00 * DESIGN REVIEW BOARD APPROVAL EXPIRES ONE YEAR AFTER FINAL APPROVAL UNLESS A BUILDING PERMIT IS ISSUED AND CONSTRUCTION IS STARTED. **NO APPLICATION WILL BE PROCESSED WITHOUT OWNER' S SIGNATURE 1 II . PRE-APPLICATION MEETING: A pre-application meeting with a member of the planning staff is strongly encouraged to determine if any additional application information is needed. It is the applicant' s responsibility to make an appointment with the staff to determine if there are additional submittal requirements . Please note that a COMPLETE application will streamline the approval process for your project . III . IMPORTANT NOTICE REGARDING ALL SUBMISSIONS TO THE DRB: A. In addition to meeting submittal requirements, the applicant must stake and tape the project site to indicate property lines, building lines and building corners . All trees to be removed must be taped. All site tapings and staking must be completed prior to the DRB site visit . The applicant must ensure that staking done during the winter is not buried by snow. B. The review process for NEW BUILDINGS normally requires two separate meetings of the Design Review Board: a conceptual approval and a final approval . Applicants should plan on presenting their development proposal at a minimum of two meetings before obtaining final approval . C. Applicants who fail to appear before the Design Review Board on their scheduled meeting date and who have not asked in advance that discussion on their item be postponed, will have their items removed from the DRB docket until such time as the item has been republished. D . The following items may, at the discretion of the zoning administrator, be approved by the Community Development Department staff (i .e . a formal hearing before the DRB may not be required) : a. Windows, skylights and similar exterior changes which do not alter the existing plane of the building; and b. Building addition proposals not visible from any other lot or public space. At the time such a proposal is submitted, applicants must include letters from adjacent property owners and/or from the agent for or manager of any adjacent Condominium association stating the association approves of the addition. E. If a property is located in a mapped hazard area (i .e. snow avalanche, rockfall, flood plain, debris flow, wetland, etc) , a hazard study must be submitted and the owner must sign an affidavit recognizing the hazard report prior to the issuance of a building permit . Applicants are encouraged to check with a Town Planner prior to DRB application to determine the relationship of the property to all mapped hazards . F. For all residential construction: Roof Siding t .n;!n i (_,L4 altit� ( Wall Materials t iv C S fi �.rn e�Z" (A)J 1-t awl Z)C s Tv9 Fascia Soffits °�a /route c1c I 0 Windows �- ` 3C - 6y('zet, aw,R (wewrt ,(&;(.� )) W , Dw Trim -e cc CP .i G Sr c. Doors 2- - 2 6 r.+., �4a4 4D-) C.,6ne Door Trim Z L( Alva i Hand or Deck Rails 2 — Flues Flashings C . moneys Trash Enclosures Greenhouses Other 2 (A)/1,4o.. Y,Gjs kti ypoi W0g.440,17ed� B. LANDSCAPING: Name of Designer: ,o1✓c, Phone : PLANT MATERIALS : Botanical Name Common Name Quantity Size* PROPOSED TREES EXISTING TREES TO BE REMOVED *Indicate cal4.ner for deciduous trees . Minimum caliper for deciduous tr. _. is 2 inches . Indicate height for coniferous trees . Minimum height for coniferous trees is 6 feet . 7 PLANT MATERIP. : Botanical Name Common; Mme Quantity Size* PROPOSED SHRUBS EXISTING SHRUBS _ TO BE REMOVED *Indicate size of proposed shrubs . Minimum size of shrubs is 5 gallon. Type Square Footage GROUND COVERS SOD SEED TYPE OF IRRIGATION TYPE OR METHOD OF EROSION CONTROL C. LANDSCAPE LIGHTING: If exterior lighting is proposed, please show the number of fixtures and locations on a separate lighting plan . Identify each fixture from the lighting plan on the list below and provide the wattage, height above grade and type of light proposed. November 12, 1992 Mr. and Mrs. J. Hickey Sundial Condominiums, Unit Al 504(Main Gore Place Vail, CO Dear Mr. and Mrs. Hickey: The board of directors of the Sundial Townhome Association developed policies on basement modifications in the summer of 1992. Generally, the board requires assurance of an operable access window, appropriate weather resistant materials and acceptance of full liability by the unit owner. I have reviewed the drawings and letter submitted on the second of November describing your plans for basement improvements at unit Al. The engineering drawings address the issues expressed by the board. This letter serves as notification that I have approved this installation as proposed as being in accordance with board policies. You may use this letter in assuring the Town of Vail that you have received Homeowner Association approval based on your specifications, dated October 22, 1992. As mentioned previously, by proceeding with this construction you relieve the Homeowners' Association of any obligation to repair or maintain the affected walls, your installations, the windows and the window wells. These improvements are the responsibility of the owner of unit Al and not an Association obligation. Further, any damage to the building complex that is caused in whole or in part as a result of this modification will be the sole responsibility of the unit owner. It would be appreciated if you would give a copy of your drawings to Slifer Management for Association records. Thanks for working with the board. I hope your renovation goes well. Very truly yours, — / /,•■ `ce Ford C. Frick President `' Project Ajiplication Date Project Name: t li^ J ��'1i1 j ( Unil "I-- A - 1 1/1 ��.- OAIJVV (Project Description: �p Contact Person and Phone } 4 Y p D . Off- M AA di 6-0-1--L , Owner, Address and Phone: Architect, Address and Phone: Legal Description: Lot (V Block Filing s NV/G4 , t ICI 2Zone Comments: Design Review Board Date Motion by: Seconded by: --"— `\� APPROVAL i DISAPPROVAL Summa y: /v ,9. A k1,,1 ice' - C A * ife Kr 196i l /\. oh RIO. Y! , G ,ib v>es` ` ' � . ' 0,5124 Town Planner ,21\5,t,aff Approval Date: 1 ! 2 -2 G-- �� 60,)• Project Application Date 94/41- Project Name: �lJn!/�!�L //4° �G`pj(/`` s' Project Description: /1W /00 4N-- SI'i 5 v 11/'N fL • Contact Person and Phone 471/ jv2 • 1/P qL/9 y7g5 Owner, Address and Phone: y�/42/4t. _/J,n 14,/74,eS C1/4 //,‘2 i/' j. /L/ taaffw 2 4191. /a5: Architect, Address and Phone: rj-/.JNDItf �� Legal Description: Lot , Block , Filing , Zone Comments: C 0A' 5 (-�5� /V T/ % Bz By/47 // ray/G/7/ f45 er Pe6 la 7//F- Any Design Review Board Date Motion by: Seconded by: APPROVAL DISAPPROVAL • Summary: • �J To�jn Planner 440 Staff Approval Date: I77�t""" • . 41- iii - rwemerrm, _ ___________ .o.-....-./....- - "......-' ''. ''''' .....-...........-..........-.0,..............,-.....-,••■•,..., 4 I - elf4:5 i 3T 4 LIG gioCUD5t-)Re. --- 1.-=-....74_31-05 4.1 aSir 1.4.4:ba, 4. a•4. Y*14)4 - & i I .-/- !EN ---41.--:---T-T----k . . _ ,i I 4 4-4.4 1 0 01, Pi 1 _44T ' 1 1 C-A Rt- fa-r L.: ro I INZ11.1..'I ii...vg; _ . -.0,0:hi Pe...-4Pa aT . i , eY.*Izt,i 0-DG , ' Ct4_1=ZEIV Fit4=1 L ° NEN PAO 'RA..E.i.X3.6 1-.1Ce.0 I Ceto ce_Prye ICAX) cp oc.1.41Strir 5E, ThQ -.414S■ 4, PAD A me-S■4 w-r.to ziir.4c, MAck,To 10 , if_.gra C.) 11. r-fla....*14 LEVEL lat M.4 C1.4Ct_TOP _..r. A 10%);T t 01.-/A 4- (--I.PbS3 1 APP41- 1.-4 -i° _ ._ ..— ., • I _ - _ - _ TR)NT ',lair 7 c:. -Zr..,-,,II-c peikCp7 L.oc...i...1,--ricio . - VEGT-1=1100 . . , . , T f, -.......---,...=_---- __.,_ ,._____ . . --------------------........ . ----w .... -----1,--- mi.tr. ,*.lczno 'S,t4 A tr.E 1;zoo Fr' _e.....--- ,,. . G ) a. 1-12FAT0 , ' • .."-‘3.N.w. .,; /./' ... (t rf...i es ;r4Dcarito . . ' 1 )Z8 cps‹.. . ebAite S 1 . 1.• 2 r%41.- PQA to,t t.SC '22+c5c ..,, i, e +' 1 z.y.x. t;;;PrAir 1 . 1 'c? _._ .-— L - ', ,- ... -i....... A---1' . — it..)'rEtz.ko C CC7•1 TD ,t4 II r4 . y-, - PA c.T.\t.:41 t. racvkk c*,;:,0 J A 1 __ - i 1 --, _ .., . ..,...„...,________T , -- , . - 1 ... ) i . f i -_ _ ' 1. .t 0 : • 4. 0 1 ti Fizti V•Ie--D•fr), I., I ..., I. U.--.:--toito 4V. k 1,..... E.s _ . rj■EalltterZi.G.- --- 1 - A . 1 - 1 - • lei Vt oA,/1 ".. -•47...it.i 0 ZO(...T T , ..I . ,,c) I _ 1 i , . . , / . . • c , „ i ...- .-' ._ of," , , . • 1_ , - ---3 • --- - _,_ ... • . 40,:,_ i I _ I, , . 11.-,_, _.4 rt.:0LT 1 co-Ps 14-1.0 .„,_ .4- ,1 0 ".4_6207 t..‘■ 1 __________.;1 - , ....._.------ 6 IL.Lo , 0::spr..............,....'"'": „,t o„.. 'It 0.,.....e.144--<-- ,.....1 -' -__________ , ___, ' _, ' i Ipt2.0' ...„...--‹ - .-----"`"-a.- ----- -..-__ _ ______ . .t. _,-- - , " — - —_ . --,,-- 1-c, ___ ' 61'6) 0 I?—/ - -----------------,7...- - - „ pi) , ____ 4 -7-,,,,c 4_4 _ ---- __. _ ---- ''',...:4- - _- ______-_, ,....,..,,, 414 I .- .., N -sp....Lc-'D 41 -,('*-7,- - ..,..--....c.<2 ., - ,,g0.0 su.s.,--------- fc,o, A..fe , 4,4-‘ny - 0,:i•-.. .. PPOPO3ED -TIA.Z -1 tsbiCt..05UTZE 31Jf\t.D tAL 10\NNI iJOUSE3 • L ....._____ . ______, .. 'II Sif `1 Z. .,.. . . .._ 1 cV �jd � c"' y 4 = �J , p e \ �a O = O C^° 1 h Q'c-/ L�b a� 3 1. h 8s o 1• ' sF o cA °9F o' ° el 5�5 Q �I .' OQs N 5°0�°°`w a '610. 1� \ N F°9,ti \ ` 1 h� \ 1 oa QP 29 9 tit ��\G 9\a� 1 M Q / ti.t / r :Mk' it 0 ,. / O 0 CO U 4D i _ / s, o ib 'L '� 6� / / 'r r LI s 1 0 V / QQQG, P�' T i•00 Q. ro / ... % x (Lh h m 2 j t o P� PQ' • C5 A _ .*' 0 _ p� _ Fs> _M °,0 /OOJ 1 G Ni :,. el .1) CjD z / '' 7 � , revised 9/4/91 DRB APPLICATION - TOWN OF VAIL, COLORADO DATE APPLICATION RECEIVED : '} R- DATE OF DRB MEETING: ********** THIS APPLICATION WILL NOT BE ACCEPTED UNTIL ALL REQUIRED INFORMATION IS SUBMITTED ********** I . PROJECT INFORMATION: A. DESCRIPTION: sc4'/ C%L�r4 77&4J# B. TYPE OF REVIEW: New Construction ($200 . 00) Minor Alteration ($20 . 00) )O Addition ($50 . 00) Conceptual Review ($0) C. ADDRESS: 5-0 cid-44/"3--/..-J 00/e °, �r � *•��d, '� ���cJ�/ dcr�o�1 D. LEGAL DESCRIPTION: Lot Block Subdivision If property is described by a meets and bounds legal description, please provide on a separate sheet and attach to this application. E . ZONING: F . LOT AREA: I! -;required, applicant must provide a current stamped survey showing lot area. /J G. NAME OF APPLICANT : Se-44.1,644-C_ V s e°_G9-c.e/N c�__l' N- S6 C, Mailing Address : , 14.4 MA Ise 366 Phone 4/76^/06 v4-# p16-17 H. NAME OF APPLICANT' S REPRESENTATIVE: 4j&..1 Mailing Address : ,3 3 ViQ fC �J, (/�6• ,r-�' /" Phone 915'-x')74— g `/7 9-?`/4( I . NAME OF OWNERS : v R^1 �/�'L k'o!.0 Cc' -) ) ^S14-612 C . *SIGNATURE (S) : ("Y) ,e Mailing Address : l,f-r %-/ Z U--Lk Phone - 76c, (c 3 [o J. Condominium Approval if applicable. K. DRB FEE: DRB fees, as shown above, are to be paid at the time of submittal of DRB application. Later, when applying for a building permit, please identify the accurate valuation of the proposal . The Town of Vail will adjust the fee according to the table below, to ensure the correct fee is paid. ens FEE PAID: $ °` - FEE SCHEDULE: (Y-'! )- � VALUATION FEE $ - $ 10, 000 $ 20 . 00 $ 10, 001 - $ 50, 000 $ 50 . 00 $ 50, 001 - $ 150, 000 $100 . 00 $150, 001 - $ 500, 000 $200 . 00 $500, 001 - $1, 000, 000 $400 . 00 $ Over $1, 000, 000 $500 . 00 * DESIGN REVIEW BOARD APPROVAL EXPIRES ONE YEAR AFTER FINAL APPROVAL UNLESS A BUILDING PERMIT IS ISSUED AND CONSTRUCTION IS STARTED. **NO APPLICATION WILL BE PROCESSED WITHOUT OWNER'S SIGNATURE 1 II . PRE-APPLICATI( MEETING: A pre-application meeting with a member of the planning staff is strongly encouraged to determine if any additional application information is needed. It is the applicant' s responsibility to make an appointment with the staff to determine if there are additional submittal requirements . Please note that a COMPLETE application will streamline the approval process for your project. III . IMPORTANT NOTICE REGARDING ALL SUBMISSIONS TO THE DRB: A. In addition to meeting submittal requirements, the applicant must stake and tape the project site to indicate property lines, building lines and building corners . All trees to be removed must be taped. All site tapings and staking must be completed prior to the DRB site visit . The applicant must ensure that staking done during the winter is not buried by snow. B. The review process for NEW BUILDINGS normally requires two separate meetings of the Design Review Board: a conceptual approval and a final approval . Applicants should plan on presenting their development proposal at a minimum of two meetings before obtaining final approval. C. Applicants who fail to appear before the Design Review Board on their scheduled meeting date and who have not asked in advance that discussion on their item be postponed, will have their items removed from the DRB docket until such time as the item has been republished. D. The following items may, at the discretion of the zoning administrator, be approved by the Community Development Department staff (i .e . a formal hearing before the DRB may not be required) : a. Windows, skylights and similar exterior changes which do not alter the existing plane of the building; and b. Building addition proposals not visible from any other lot or public space. At the time such a proposal is submitted, 'applicants must include letters from adjacent property owners and/or from the agent for or manager of any adjacent condominium association stating the association approves of the addition. E. If a property is located in a mapped hazard area (i .e. snow avalanche, rockfall, flood plain, debris flow, wetland, etc) , a hazard study must be submitted and the owner must sign an affidavit recognizing the hazard report prior to the issuance of a building permit . Applicants are encouraged to check with a Town Planner prior to DRB application to determine the relationship of the property to all mapped hazards . F, For all residential construction: a. Clearly indicate on the floor plans the inside face of the exterior structural walls of the building; and b. Indicate with a dashed line on the site plan a four foot distance from the exterior face of the building walls or supporting columns . G. If DRB approves the application with conditions or modifications, all conditions of approval must be resolved prior to Town issuance of a building permit . 2 IV,: NEW CONSTRUCTTr)N A. Three copies of a recent topographic survey, stamped by a licensed surveyor, at a scale of 1" = 20' or larger, on which the following information is provided: 1 . Lot area. 2 . Two foot contour intervals unless the parcel consists of 6 acres or more, in which case, 5' contour intervals may be accepted. 3 . Existing trees or groups of trees having trunks with diameters of 4" or more, as measured from a point one foot above grade. 4 . Rock outcroppings and other significant natural features (large boulders, intermittent streams, etc . ) . 5 . Hazard areas (avalanche, rockfall, etc . ) , centerline of stream or creek, required creek or stream setback, 100-year flood plain and slopes of 40% or more, if applicable. 6 . Ties to existing benchmark, either USGS landmark or sewer invert . This information should be clearly stated on the survey so that all measurements are based on the same starting point . This is particularly important for height measurements . See Policy On Survey Information, for more information regarding surveys . 7 . Locations of the following: a. Size and type of drainage culverts, swales, etc . must be shown. b. Exact location of existing utility sources and proposed service lines from their source to the structure. Utilities to include: Cable TV Sewer Gas Telephone Water Electric c . Show all utility meter locations, including any pedestals to be located on site or in the right-of-way adjacent to the site. Revocable permits from the Town of Vail are required for improvements in the right-of-way. d. Property lines - distances and bearings and a basis of bearing must be shown. e. All easements (Title report must also include existing easement locations) 8 . Existing and finished grades . 9 . Provide spot elevations of the street, and a minimum of one spot elevation on either side of the lot, 25 feet out from the side property lines . B, Site Plan 1 . Locations of the following: a. Proposed surface drainage on and off site. b. Proposed driveways . Percent slope and spot elevations must be shown. 2 . All existing improvements including structures, landscaped areas, service areas, storage areas, walks, driveways, off-street parking, loading areas, retaining walls (with top and bottom of wall spot elevations) , and other existing site improvements . 3 3 . Ele' _ions of top of roof ridge (with existing and proposed grades shown underneath) . These elevations and grades must be provided in order for the staff to determine building height . All ridge lines should be indicated on the site plan. Elevations for roof ridges shall also be indicated on the site plan with corresponding finished and existing grade elevations . 4 . Driveway grades may not exceed 8% unless approved by the Town Engineer. C. Landscape Plan (1" = 20' or larger) - 3 copies required 1 . The following information must be provided on the landscape plan. The location of existing 4" diameter or larger trees, the location, size, spacing and type (common and latin name) of all existing and proposed plant material . All trees to be saved and to be removed must also be indicated. The plan must also differentiate between existing and proposed vegetation. 2 . Complete the attached landscape materials list . 3 . The location and type of existing and proposed watering systems to be employed in caring for plant material following its installation. 4 . Existing and proposed contour lines . NOTE : In order to clarify the inter-relation of the various development proposal components, please incorporate as much of the above information as possible onto the site plan. D . Sign off from each utility company verifying the location of utility service and availability (see attached) . E . A preliminary title report must accompany all submittals, to insure property ownership and location of all easements on property. F . Architectural Plans (1/8" = 1' or larger, 1/4" is preferred scale for review) 3 copies required. 1 . Scaled floor plans and all elevations of the proposed development . Elevations must show both existing and finished grades . 2 . One set of floor plans must be "red-lined" to show how the gross residential floor area (GRFA) was calculated. 3 . Reductions of all elevations and the site plan (8- 1/2" x 11") for inclusion in PEC and/or Town Council memos may be requested. 4 . Exterior surfacing materials and material colors shall be specified on the attached materials list . This materials list must be completed and submitted as a part of DRB application. Color chips, siding samples etc. , should be presented to the Design Review Board meeting. G. Zone check list (attached) must be completed if project is located within the Single-Family, Primary/Secondary or Duplex zone districts . H. Photos of the existing site and where applicable, of adjacent structures . 4 I . The Zoni. Administrator and/or DRB ay require the submission of additional plans, drawings, specifications, samples and other materials (including a model) if deemed necessary to determine whether a project will comply with Design Guidelines . V. MINOR ALTERATIONS TO THE EXTERIOR OF BUILDINGS . Photos or sketches which clearly convey the redevelopment proposal and the location (site plan) of the redevelopment proposal may be submitted in lieu of the more formal requirements set forth above, provided all important specifications for the proposal including colors and materials to be used are submitted. VI . ADDITIONS - RESIDENTIAL OR COMMERCIAL A. Original floor plans with all specifications shown. B. Three sets of proposed floor plans 1/8" = 1' or larger (1/4" = 1' is preferred) C. Three copies of a site plan showing existing and proposed construction. Indicate roof ridge elevations with existing and proposed grades shown underneath. D . Elevations of proposed addition. E . Photos of the existing structure. F. Specifications for all materials and color samples on materials list (attached) . At the request of the Zoning Administrator you may also be required to submit : G. A statement from each utility verifying location of service and availability. See attached utility location verification form. H. A site improvement survey, stamped by registered professional surveyor. I . A preliminary title report, to verify ownership of property, which lists all easements . VII . FINAL SITE PLAN Once a building permit has been issued, and construction is underway, and before the Building Department will schedule a framing inspection, two copies of an Improvement Location Certificate survey (ILC) stamped by a registered professional engineer must be submitted. The following information must be provided on the ILC: A. Building location (s) with ties to property corners, i .e. distances and angles . B. Building dimensions to the nearest tenth of a foot . C. All utility service line as-builts, showing type of • material used, and size and exact location of lines . D. Drainage as-builts . E . Basis of bearing to tie to section corner. F. All property pins are to be either found or set and stated on improvement survey. G. All easements . H. Building floor elevations and all roof ridge elevations with existing and proposed grades shown under the ridge lines . 5 VIII .CONCEPTUAL DE'TGN REVIEW A. Submittal requirements : The owner or authorized agent of any project requiring design approval as prescribed by this chapter may submit plans for conceptual review by the Design Review Board to the Department of Community Development . The conceptual review is intended to give the applicant a basic understanding of the compatibility of their proposal with the Town' s Design Guidelines . This procedure is recommended primarily for applications more complex than single- family and two-family residences . However, developers of single-family and two-family projects shall not be excluded from the opportunity to request a conceptual design review. Complete applications must be submitted 10 days prior to a scheduled DRB meeting. The following information shall be submitted for a conceptual review: 1 . A conceptual site and landscape plan at a minimum scale of one inch equals twenty feet; 2 . Conceptual elevations showing exterior materials and a description of the character of the proposed structure or structures; 3 . Sufficient information to show the proposal complies with the development standards of the zone district in which the project is to be located (i .e. GRFA, site coverage calculations, number of parking spaces, etc . ) ; 4 . Completed DRB application form. B. Procedure : Upon receipt of an application for conceptual design review, the Department of Community Development shall review the submitted materials for general compliance with the appropriate requirements of the zoning code. If the proposal is in basic compliance with the zoning code requirements, the project shall be forwarded to the DRB for conceptual review. If the application is not generally in compliance with zoning code requirements, the application and submittal materials shall be returned to the applicant with a written explanation as to why the Community Development Department staff has found the project not to be in compliance with zoning code requirements . Once a complete application has been received, the DRB shall review the submitted conceptual review application and supporting material in order to determine whether or not the project generally complies with the design guidelines . The DRB does not vote on conceptual reviews . The property owner or his representative shall be present at the DRB hearing. 6 LIST OF MATERIALS NAME OF PROJECT: 5c-,,J A / 07a/trig & c!L LEGAL DESCRIPTION: LOT BLOCK SUBDIVISION STREET ADDRESS : i ( ci-e.e,i d ,-,z4.,,d/Ye 4vco f! DESCRIPTION OF PROJECT: &.I T�'4.JW . 4eecf 2_-- de &</a •Q-S. The following information is required for submittal to the Design Review Board before a final approval can be given: A. BUILDING MATERIALS : TYPE OF MATERIAL COLOR Roof S/ 4- g/11rJ1; c " Siding Cc('.Aaile- �N4-t- A1�� - Other Wall Materials /fie th5 (.K 3 / p f-- Cu o14-4 A—)12 6 X6 7ree-e Q' . Fascia C'&?j,4-2_ / )c Soffits Windows Window Trim Doors '-4/ cr-1 /A/?' Door Trim Hand or Deck Rails Flues Flashings Chimneys Trash Enclosures i /A) Greenhouses / Other EV7* A) (V0)t-d 7 GI4.l{ ce(-C))''/A)¢ CAW-1-1 B. LANDSCAPING: Name of Designer: Phone : PLANT MATERIALS : Botanical Name Common Name Quantity Size* PROPOSED TREES EXISTING TREES TOO i.J v BE REMOVED //// *Indicate caliper for deciduous trees . Minimum caliper for deciduous trees is 2 inches . Indicate height for coniferous trees . Minimum height for coniferous trees is 6 feet . 7 PLANT MATERIALS : Botanical Name Common Name Quantity Size* PROPOSED SHRUBS • EXISTING SHRUBS \(() TO BE REMOVED *Indicate size of proposed shrubs . Minimum size of shrubs is 5 gallon. Type Square Footage GROUND COVERS SOD SEED TYPE OF IRRIGATION TYPE OR METHOD OF EROSION CONTROL C . LANDSCAPE LIGHTING: If exterior lighting is proposed, please show the number of fixtures and locations on a separate lighting plan. Identify each fixture from the lighting plan on the list below and provide the wattage, height above grade and type of light proposed. d-) /(A D. OTHER LANDSCAPE FEATURES (retaining walls, fences, swimming pools, etc . ) Please specify. Indicate heights of retaining walls . Maximum height of walls within the front setback is 3 feet . Maximum height of walls elsewhere on the property is 6 feet . tl 8 "` ''ILITY LOCATION VERIFICATI' SUBDIVISION JOB NAME LOT BLOCK FILING ADDRESS The location and availability of utilities, whether they be main trunk lines or proposed lines, must be approved and verified by the following utilities for the accompanying site plan. Authorized Signature Date U. S. West Communications 1-800-922-1987 468-6860 or 949-4530 Public Service Company 949-5781 Gary Hall Holy Cross Electric Assoc. 949-5892 Ted Husky/Michael Laverty Heritage Cablevision T .V. 949-5530 Steve Hiatt Upper Eagle Valley Water & Sanitation District * 476-7480 Fred Haslee NOTE: 1 . This form is to verify service availability and location. This should be used in conjunction with preparing your utility plan and scheduling installations . 2 . For any new construction proposal, the applicant must provide a completed utility verification form. 3 . If a utility company has concerns with the proposed construction, the utility representative should not directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be spelled out in detail in an attached letter to the Town of Vail . However, please keep in mind that it is the responsibility of the utility company to resolve identified problems . 4 . If the utility verification form has signatures from each of the utility companies, and no comments are made directly on the form, the Town will presume that there are no problems and that the development can proceed. 5 . These verifications do not relieve the contractor of his responsibility to obtain a street cut permit from the Town of Vail, Department of Public Works and to obtain utility locations before digging in any 7)ublic right-of-way or easement in the Town of Va.i ., . A building permit is not a street cut per' ' t . A street cut permit must be obtained separ Please bring a site plan, fi :')r plan, and elevations when obtaining Upper Eagle Valley Water & Sanitation signatures . Fire flow needs must be addressed. 9 ZONE CHECK FOR SeR, R, R P/S ZONE DISTRICTS DATE: LEGAL DESCRIPTION: Lot Block Filing ADDRESS : OWNER PHONE ARCHITECT PHONE ZONE DISTRICT PROPOSED USE **LOT SIZE Allowed Existing Proposed Total Height (30) (33) Total GRFA Primary GRFA + 425 = _ Secondary GRFA + 425 = _ Setbacks Front 20' Sides 15' / Rear 15' Water Course Setback (30) (50) Site Coverage _ Landscaping Retaining Wall Heights 3° /6' Parking Reqrd Garage Credit (300) (600) (900) (1200) Drive : Permitted Slope 8% Actual Slope Date approved by Town Engineer: View Corridor Encroachment : Yes No ??? Environmental/Hazards : 1) Flood Plain 2) Percent Slope 3) Geologic Hazards a) Snow Avalanche b) Rockfall c) Debris Flow 4) Wetlands Previous conditions of approval (check property file) : Does this request involve a 250 Addition? How much of the allowed 250 Addition is used with this request? **Note : Under Sections 18 . 12 . 090 (B) and 18 . 13 . 080 (B) of the Municipal Code, lots zoned Two Family and Primary/Secondary which are less than 15, 000 sq. ft . in area may not construct a second dwelling unit . The Community Development Department may grant an exception to this restriction provided the applicant meets the criteria set forth under Sections 18 . 12 . 090 (B) and 18 . 13 . 080 (B) of the Municipal Code including permanently restricting the unit as a long-term rental unit for full- time employees of the Upper Eagle Valley. 10 4 §-IF:4 I L._ aneous ce p t • C-iccoura. CK -20.58 PL TOtiNHCIME',PRE 1.,:tf;::-S, FEE • ciffioun rliFi.?r > 20, I tem paid 3aId I El ci 2.0,CIO t u riled > V HI riza U r E N I FIER, . . _ ,, :....:.•••••••,•••••:•:.-',:o....::,•%!:•...,-•:.'•:.:::::,•••••••::••$,,,'::::•••,,,:,,,•••:•:::::::•••,:;••:::•••:..:::,•---:-..::•,.::::•::•••.'.:,::•:•••:•::;•::::::,:::•.:::;:::•V:r,;::: ::,:;;*.:::::::::::::::::::,::'::::::::::::?•::•:::::::i,::::::::: :•:?.::::::•..,::,.••::-:.,:::::-". -••:::::::?:::.;::::::::,•.!::::$•:ii:.•:;:;;;:::',?•:::Ii;::::';:::::;i•::.:::,:::*•,•,?•:N::: :::::;.::::;::::••••:i:::•::::::,:::•:::::::::::`::::::.:-•:: _ , .. ,• ::::, • - .,.. 1 : TOWN OF VAII7 ,. . :.-.:.] DEPARTMENT OF COMMUNITY DEVELOPMENT • ::::'::-. ,::... SALES ACTION FORM •::::::. . '::1•:!.. /1 • •••,,- / :-.4...—f,',".1 •„•••-, , ,P„,-, , .,,,,,.. i 6';.;.-... 4'.:: .•:.: NAME 41 ,,,-.4.kx,,,,, i , ,--- 4K---: '''''''''' "`-'-'-' ,„e.;c- .' DATE 7 i /0/ ,:.. xccouNTNo..::.,::.E:::;,::::::i„t:::::::;::::::::‘::::::::::::::::,,i.:::::::,:,.:::2;.:1.:::::.,:::,:ii::::::::,:.E .:::.::-,:::::::,: :::::::::::,:::::::::.::::::::ITEN.1:::::%::;::;::0::::: ::::::::::::::::::: :::::No:::::-,;:::: ::::.::::tosTEA :::meroTA :::::',:..,..,.. ,..,:.... . 4. 01 0000 41540 ZONING AND ADDRESS MAPS •- '' - ' ' ' - ' 55.00 .4:, * .. -':•::::..• •..-• 01 0000 42415 UN FORM BUILDING CODE • 550.00 . . * •:::::, ::.:...: 01 0000 42415 UNIFORM PLUMBING CODE • 536.00 * •::::: 01 0000 42415 - UNIFORM MECHANICAL CODE I $3200 .,::::':. * ..:i• '•:-:,::• 01 0000 42415 UNIFORM FIRE CODE $3600 - *.:: * ''...:' 01 0000 42415 NATIONAL ELECTRICAL CODE I I .$30.00 .;i::::: * ..::.: :::::•• 01 0000 42415 OTHER CODE BOOKS • ::::. * .,..-.:: .:„.... 01 0000 41548 BLUE PRINTS(NIYLA RS) I I 57.001 .:•-::- '.:;::: * :::i- 01 0000 42412 I XEROX COPIES/STUDIES I I 50.251 ::::... 01 DOM 42371 I PENALTY FEES/RE-LNSPECTIONS ' I . -,.-. i.•;!:- 01 0000 41332 i FLAN REVIEW RE-CHECK FEE [S40 PER HR.) • I I . •-•:::•-•• •;::::::. 01 0000 42322 OFF HOURS INSPECTION FEES • I I 01 0400 41412 I CONTRACTORS LICENSES FEES ,.. - ,i•T. 01 0000 41330 I OTHER FEES . I . . '.... . 01 0000 414)3 J SIGN APPLICATION FEE I I 520.001 • :-.?:::..: 01 0000 41413 I ADDFTIONAL SIGNAGE FEE [S1.00 PER SQ.FT.) . I ; • .1 :,... 01 0000 424-10 I VTC ART PROTECT DONATION I I •;;P;.' 01 0000 41331 I PRE.PAID DESIGN REVIEW BOARD FEE / - le...'';'--.'' I 72) .::::::::•:"•:' •.:,.: :i;:.• 01 0000 I --. ......... * 01 0000 21112 TAX (4Z) ..,.., • * 01 0000 41010 TAX (4Z) . .:.::.• ... iyi . .....` ... . ... . . . . .. ..... . . . .„ .. .:..:: :::.': ,,..:::-::::.:.;:•.:....:......-.....:.;:s.,'::::-:....'.:::i...:::-..:-....:•.:.-..:',-.7,:.-:::;.,'::,..,:.,::,,•::::::::,';,::: -::::.'::::::.;'..i.::::::::::::::::::::::::::::::::::::::::::::::-:-:':'::::'.'.:%:::: :::•••:.::.::.•_.%.,::.]:i:::,:::;:::'i::::::: :::':':::•::::::*•::,;::::::]:-•?.: ::::!:::::::::,:..'::::::.:j::::::::::::::::::::::::: :.:.:::::::::::::::::::,,::::,.:.:::::::.::::.,.::?•:,:::,:::-....::-.•:•,:..f.,:::: PEO.A PPLICATIONEEESM:V.:;R:E;:5.::::;;faM:::gaP.:IX.::::.::::::•i:::;3:.:MI::::M.:::g5;.0.0.51::i;M:WSW2 ;!:::;:•.: ,.., ... .. . . ...... ..... ..... . ..... .......... ........ .,...... 01 0000 4 T330 ADDITIONAL GRFA "250" . 5200001 01 0000 41330 CONDITIONAL USE PERMIT I I 5200.00 01 0000 41330 EXTERIOR ALTERATION (LESS THAN 100 SQ.FT.) 5200.00 ..•••:::::- 01 0000 41330 EXTERIOR ALTERATION (MORE THAN 100 SQ.FT.) 5500.00 I .:,;;::• 01 0000 41330 SPECIAL DEVELOPMENT DISTRICT [NEW] I 51.500.001 ::•,..::': • ::••:.• 01 0000 41330 SPECIAL DEVELOPMENT DISTRICT [MAJOR AMEND] • 51,000.001 ::;.•: :::..". 01 0000 41:4:10 'SPECIAL DEVELOPMENT DISTRICT (MINOR AMEND) 5200.001 :g 01 0000 41330 I SUBDIVISION . ,...i•:. i:•::::::: 01 0000 41330 ;VARIANCE $25000 1 01 0000 41330 I ZONTNG CODE AMENDMENTS • 5250.00 .:,.. -•'.•• 01 0000 41330 IRE-ZONING 1 5200.001 ,.,..: ••:::;• :-.;:-.• 01 0000 -I I I g • . C•:- i..::::::::. N rii „..... .4 ..,A.. COMIENS , , 4 .,..4,.. A -•#-':: r•-r----5-../,..)6'''''' .::::::::;::-::.:.:.:: A:. . L, .... ., -.-,L ,•!7'..-A---. ::,•:.••• ,•;:::. --, 'A 1.', ,.." , •? - . , • • :;:::1 ,,,,/ - •::::: ,............. -,i-• — • vi yv!l�' ' ' 1 DESIGN REVIEW BOARD AGENDA AUGUST 7, 1991 i f- 3: 0 0 P.M. f 4 REVISED 7/6/91 - 5:00 p.m. SITE VISITS 1 : 15 P.M. 1 Elk Creek Townhomes - 767 Potato Patch Dr, East Side 2 Elk Creek Townhomes - 767 Potato Patch Dr, West Side 3 Wertheim Gazebo - 774 Potato Patch Drive 4 Daly Residence - 782 Potato Patch Drive 5 Tupy Residence - 1901 Chamonix Lane 6 Oberlohr Addition - 2656 Davos Trail 7 McDonalds - 2172 N. Frontage Road 8 Hernreich Garage - 2684 Larkspur Court 9 Vail Glo Bollards - 701 West Lionshead Circle 10 Sundial Plaza Landscape Improvement Plan - Lionshead 11 Lifthouse Lodge - 555 E. Lionshead Circle 12 Lodge Tower - 200 Vail Road 13 Daily Grind Menu Board - 288 Bridge Street 14 Trope Residence - 1115 Hornsilver Circle 15 Arthur Residence - 3956 Lupine Drive 16 Streamside Duplex - 4551 Streamside Circle :;,<,y,,.,f..,w..,;..»»,...fmf:rrrriiini rir rr.::.:.;,.;,r.<iiiimr.n:r is iir. . nwrmc....mr:•rrr +ri!..:.,cc+.�r.::r.•::;:•:..:c:::.>::••:r::,u:•:•:u .. :: ,....c...: .:.......... ..:........... .a:G %E:?,:;::::x:•::'.: '.. 'lr.'ru iiiiu'' ` 'r:`ul�':::.G:✓,w::::✓i .cui .0 : ..,.....ti :.M..0 AGENDA 1 . Gasthof Gramshammer - Landscape Plan AK 231 Gore Creek Drive/Lot H & I, Block 5-B, Vail Village 1st MOTION: George Lamb SECOND : Pat Herrington VOTE : 5-0 Consent approved. 2 . Kravis - Outdoor Lighting Plan AK 424 Forest Road/Lot 4, Block 1, Vail Village 3rd MOTION: George Lamb SECOND : Pat Herrington VOTE : 4-0-1 Denied 3 . Tupy - New Primary/Secondary Residence AK 1901 Chamonix Lane/Lot 33, Buffehr Creek Subdivision MOTION: SECOND : VOTE: TABLED TO AUGUST 21ST MEETING 4 . Vail Recreation District - New Signage SM 292 West Meadow Drive MOTION: SECOND: VOTE: TABLED TO AUGUST 21ST MEETING 5 . Lodge Tower Sign Variance SM 200 Vail Road/Lot A, Block 5-C, Vail Village 1st MOTION: George Lamb SECOND : Pat Herrington VOTE: 5-0 TABLED - Board directed applicant to resubmit smaller sign within 25 feet of grade. 6 . Vail Glo Lodge - Bollards BR 701 West Lionshead Circle/Lot 1, Block 2, Vail Lionshead 3rd Filing MOTION: George Lamb SECOND : Pat Herrington VOTE : 4-1 Approved with suggestion that the hill to the east of the new walls be seeded with wild flower mix. Sherry Dorward felt the landscaping was inadequate and she ? 7 . Landscape Improvement Plan - Sundial Plaza, Lionshead JK MOTION: SECOND : VOTE: Conceptual Review. 8 . Hernreich Residence - Garage Addition BR 2684 Larkspur Court/Lots 1 & 2, Block 1, Intermountain MOTION: George Lamb SECOND : Pat Herrington VOTE: 5-0 Approved with condition that PEC approve extension of wall and all zoning requirements are met . 9 . Wertheim - Gazebo BR 774 Potato Patch Drive/Lot 11, Block 2, Vail Potato Patch a resubdivision of Lot 7, Block 2, Vail Potato Patch MOTION: George Lamb SECOND: Pat Herrington VOTE: 5-0 Consent approved. _ r, v F1Gt,. ,E II � �: _ ..,� 1 8660 _ - -- ' / '" ,,�\ :Ti• _ - • ;T.-241\ kJ '`' / '-- _,-:7' ;7/ ,/ /,./ \\' ) c--- , ‘-__ - .j)N4 / ' N\-----7---- 7.i.:`.. , ------------:----::L-- --- ' --- / . ' „, i kk `1 '--- , k (c----- / ...___________77._______- _,,,,______,_,_____ r - - ------\/y���- , ---__��--may^\ �4� ,-r / �J/;:r ,( f� 1 , , •. .../i, cf://° ' -as- _Nweli.....„ -- 7' 7\ 77,,::-'2'r= a / _ T ry �+ r I i, ".1 ::-. I ) �L` ` J�, (' _ -�____ _______._____ 00 . . 8670 �� �- 24.1 xer,� � ,- ����:�� \� ', \�_., �, `i, ��-,�--__--_.___ r � _ °_ _ ~` �6'�® --� ♦ i•�`�`\. \ ly ` `, .\ ,� "�_..=��% 4# '_I -618.23--- � Wr R7 . / 1 _ , , , . .. ,, ,,,0 100 200 300 °�: � -N, ___ i --� = 68 _. Q /-Aso / \ r . - /' / ,, , ,,Graphic Scale In Feet . .�o / -` i ' _. t // k�i• ...-------- ' /ti'� 861�� �. \ -�,J //y!" �/ \ . ^...ii -- ' Y J �� \\ --- -_ � -._��"4y� f �% • = f L / ' /r' 1( -- ... (\ 0/771/ 71// . =._75-7.-------e)----""Th T � j .� •6 ~` � � �_ % r - - q .i ......_,_.----------- -----------"7"--- 86/0 ////:///// ::\::;/\':' it - - 1 1 ) 41 :/-1/7-2.-,4 ri- --■ ___-,--"\- -/L. -1/4't" ./ f if l');" 71::ji: v 1. IL _ f Of:4' 1 i 0> __ ...- ...-- / -,./...0101•1111-.-1--11.7-71.1r--... ', ,. / -\---_,-N \ . ___ -\=...- .....it ''i �/ / v-� `Sl�G} / f {L1� r \ \', } �\ �� .!" --'‘e 7-- 1 \_ \ \ �� �f �/ p I J $LV}s�1400001,1 r .,.._.:, -----.:---1-"---- ,___ -- _ _4. ---, ' • . ., ,_ ., . . . ( : ( ,__. \, "----8!0J----°-- , \ \ / 4' lif , 0. // /� \ r i ,00m„,..---- - - -.--2:. I411 i , ,...„, (1.‹..„., °. , , :--,... 68:5,;:o .--'-----...„...::: A/A :-./ 4-,-.: .4 ,- • ,..„ , ---------__>- .--- , --_-_-------- . -------) '_,_-,-.8-56°-___--------------->___- -----•________--- ------------___ 7.7_ ---\- -----: �. -- �.�- BRUSH !I mss' _/ - 863.0 A, \ ,-, .,,,_ , , ) , ,\___,____-_-___,,, H1T _.. _ ...._ -j 65.2 ' -./ <*')---1111M.-- ://' ' '1 : f\ I 3a =�4 '34 :: 8544 C ,�'' , 6 r BFI ��X ::---- '..\ T `� / - 'S4 ' � , ti ti rli/:l r•ri l r 2 ter. 1 /� 1 /) 0:-)411, op -..-„,„ ___ \\ ,,,, 65.I , i ..• %iir i.1--'i ,..._ 0 , ( ,-- ______ _ / p� 7, (L) -. -Lit int \ : ____.---- _,.-\:,, 11■ :-) \ , , 1 --sof /7%. ( At - /7.-- ' ' ,+ ,., ,___Fili -- . __ - s(r._4, , __ DEVELOPMENT C.- 4 \\> dir { 0.-. SITE Sec 63 I � �� � � r / 1 d 1�� �/-'1 i - scii.iiho.0--- _______H., 65 M CONST. { gI6 � l 7-::„..,,,,,,,- r E 8519. 2 4 ' 4 ;l �...R 8519.2 ` - j� I �\ � f � f ` /'rI 6f - '\ (� ,-'r`- r' I mo'1 , \ - 64, 4 f,.4:.. .‘ , �, s I r'----) L______ --__„, (.... _ --- r'EATF-- 4 . ____ I - --- _ ) . . \,,' �' sec 62.a -� \ �'� -�/ /�/' �� Sec 62.6 '� _ %/ ��� / f!r/�/�E 8531.© f '1 - �, ,�� E 8 523.9 E 8534.9 - ti. ! ' / =-- ,;,�� 8531. �/ -s_ - ',- . t -, . `1 '� "� - 8524.5 R8534.9 i / � � , ,/ / /0 11114 . , derVi1/4„ , i 11‘ \ ) , , .,isiiiiiiii , _, -�--� -, fir;,, , I �''0 ;h! :5 �� / �,+ . ' rr d / , 4.‘ -'' s ,,I 1 t c 3 ,.► � Y f /� k ' 73.3 ��� k" • ti . / �- r J. .\ \cli:_ ,, _ \ , 1 I i iii : • 4111111Iiiiiiii°11; ' - ' 7 G II �. { \ i " - EXIST COND. 'LOODPLA r C "` �� `u� �°�yCR�i �' �„ ' r �_• rr AS DEFINED ROM ADDI • I I ,\ `ar r i ,,ft .) ' _, :N4041r DNS [�, �--I - . CRASS SECTNS R 1 ,�Bevis rodi f i I ��\1 9g o floodplain I,. ; _ mss._ " ��/� EXIST CON D. Ft_OODPLAIAJ \ �'����/ i �N;;� '� `�`'itr�,�: s -----X.-775.8 ; `- '/� /// FROM REVISION I '` ,/ �`% �O ir 1. Y Op -------T, ,J / 'max i iP ' \ \; /; \ ,� . 7-) , . ,., ,.,.. 854, __ _ _ . ........_ .0 _______ „. , .. ,U ,'t 6;5„6°• -� I ;/ ,/ © i //,� \ / . . , 0 'e .7 / . /� r \ J�� / ______ --------:..;.___,-.-/ ://\\,', , ) \ ( : ) . . ///://----- - \ ___ ,,,, ..v y \ C► i vv LEGEND: ,�� �. - ro NOTES COLORADO WATER CONSERVATION BOARD• ; \\ �\ i \ Y / ` - ~ ~'� �4. Revised 100 year floodpiain I. See plate 1 for index to flooded areas Exist. 100 ear flood loin TOWN OF VA1L ,��a`�i' Y p profile plates and the legend. ` E 8524. 0 Exist. grading 100 ear water EAGLE COUNTY , COLORADO 2. See plate 25 for illustrated cross � v A '� surface ections. * - / R 8524. / ;��� --_ \ Revised grading 100 year 3. For flood elevations at reference � ��� CREEK �. water surface points See table ni..- z* FLOODED AREAS 3 2 ALTER FP FOR GRADING SEC. G2.5-63 10/10/79 MAY , 1975 '30 EE TABLE IX�11N TrCHNICAL ADDENDUM I.ALTER FP FOR BQIDCaE SEC„ fo4 1112/18 L.L.V. Prepared by ■ ' 'Q - TRIAD LTD. Lakewood Colorado �� 6- PLATE 19 rie cA".„.„,,Th . 0 ,_,,„ udouL) • ____ __________ ____________ ______ HYDRO-TRIAD,LTD. October 22, 1979 Mr. Jeff Spanel Intermountain Engineering Box C-100 Avon, CO 81620 Dear Mr. Spanel : Enclosed are 6 copies of our report "Sundial Development 100-Year Flood- plain Definition." This study presents the floodplain revision resulting from the proposed overlot grading plan for the Sundial Development. The floodplain shown is revised from that presented in the "Gore Creek Floodplain Information" report. Based on the analysis, we have found that the proposed development will not significantly increase the flooding hazards to upstream or downstream properties, and that the proposed buildings do not lie within the revised flood- plain. It has been our pleasure serving you in this matter. If you have any questions, please contact us. Sincerely, HYDRO-TRIAD, LTD. , e-'- tc/z, '(-6.eV/ Will '`am B. Mathews 'esource Engineer--/ / ,.. ,:z,,,i/ --- ,../.....,„ 1:7-- /.7,c.„. , :: .. .. _ ,:,,_, ,....'ona d L. Hal, 6y,, P.E. �; :- 8 President ` , [ _- - j .1 WBM: RLH/dh ,`Pc, � Encl : 6 copies report .s.:,/, ' rFC�' 7500 W. MISSISSIPPI AVE. - SUITE 10 LAKEWOOD, COLORADO 80226 PHONE 303-934-2477 SUNDIAL DEVELOPMENT 100-YEAR FLOODPLAIN DEFINITION TABLE OF CONTENTS Page I . INTRODUCTION 1 II. ANALYSIS 2 III . RESULTS AND CONCLUSIONS 4 IV. REFERENCES 6 APPENDIX - Backwater Computer Analysis TABLE I - Existing and Future Grading Condition Backwater Results LIST OF FIGURES FIGURE I - Location Map FIGURE II - Gore Creek Flooded Areas FIGURE III - Site Plan SUNDIAL DEVELOPMENT 100-YEAR FLOODPLAIN DEFINITION I . INTRODUCTION The Sundial Development site is located northwest (downstream) of the Main Gore Drive Bridge on Main Gore Drive in the Big Horn Subdivision, Eagle County, Colorado (see Figure I) . The site lies on the north side of Gore Creek. The study area extends from station 592+25 to 600+25 as defined in the Gore Creek Floodplain Information Report (Ref. 1 ) . The purpose of this study is to examine the effects on the 100-year recurrence interval floodplain resulting from the proposed regrading of the site for development purposes. -1- II . ANALYSIS Subsequent to preparation of the Gore Creek Floodplain Information Study (GCFIS, Ref. 1 ) , the town of Vail improved the bridges upstream and downstream of the Sundial site. These bridges are the Main Gore Drive Bridge (approximately 150' upstream of the Sundial site's southern boundary) and the Meadow Drive Bridge (approximately 3100' downstream of the site) . These two improvements reduced the 100-year floodplain from that indi- cated in the GCFIS. An analysis performed January, 1978 revised the 100-year floodplain to reflect this reduction. In order to more accurately define the floodplain in the vicinity of the site, additional backwater cross sections were inserted at 100' to 150' inter- vals. Existing condition cross sections were coded from the GCFIS mapping , while future grading condition topographic information was taken from the site' s overlot grading plan. The 100-year water surface profile was determined using the same standard-step backwater method utilized in the original GCFIS report, and is based on the future development condition 100-year flood dis- charge of 1423 cfs shown in that report. The backwater analysis was initialized downstream of the site at section 62.3 of the GCFIS (see Figure II) . The 100-year water surface elevation was taken from the GCFIS. The site mapping is based on an assumed datum. Its topography was adjusted to the USGS datum used in the GCFIS. Any topographic discrepancies between the two sets of mapping were resolved in favor of the official GCFIS mapping, an approach viewed as conservative. The site placement on the GCFIS mapping was located as shown on Figure II . Figure III shows the site layout and overlot grading plan." -2- The backwater analysis was initialized downstream of the site, at section 62.3 of the GCFIS (see Figure II) . The 100-year water surface eleva- tion was taken from the GCFIS. The site mapping is based on an assumed datum. Its topography was adjusted to the USGS datum used in the GCFIS. Any topographic discrepancies between the two sets of mapping were resolved in favor of the official GCFIS mapping, an approach viewed as conservative. The site placement on the GCFIS mapping was located as shown on Figure II . Figure III shows the site layout and overlot grading plan. -3- III. RESULTS AND CONCLUSIONS A floodplain analysis has been performed for the Sundial Development site along Gore Creek. The reach analyzed is located downstream of Main Gore Drive Bridge. The purpose of the analysis was to determine the effect of the pro- posed overlot grading on the 100-year floodplain as defined in the Gore Creek Floodplain Information Study. The proposed development plan involves placing fill within the 100-year floodplain over a distance of approximately 500 feet. The 100-year floodplain for this condition shows only slight, localized water surface and velocity changes due to the proposed grading alterations. The maximum change in water surface for the future grading condition is an increase of 0.6 feet at section 62.6. The remaining sections showed no significant change between the existing and revised water surface. The main channel velocity increased by 3.0 fps at section 62.7. The resulting velocity (7.9 fps) is still less than the main channel velocity of all but the initial section. Table I, below, presents a summary of the backwater analysis for both the existing and future grading condition. The computer printouts for the analysis are presented in the appendix. Both existing and future grading condition floodplairis are shown on Figures II and III . -4- TABLE I SUNDTAI DEVELOPMENT 100-YEAR FLOODPLAIN EXISTING AND f U )GRADING CONDITION BACKWATER RESULTS* CROSS SECTION. WATER SURFACE VELOCITY (FPS) ELEVATION EXISTING GRADING CONDITION LEFT MAIN RIGHT 62.3 8503.5 3.5 7.5 3.6 62.4 8512.1 0.4 9.0 4.8 62.5 8519.2 3.0 8.0 0 62.55 8522.3 4.2 8.2 0.2 62.6 8523.9 4.0 10.0 0 62.7 8527.4 2.5 4.9 0 '`` 62.8 8531 .0 0 9.3 0 creel 63.0 8534.9 1 .2 8.6 1 .9 l, FUTURE GRADING CONDITION ! 62.3 8503.5 3.5 7.5 3 62.4 8512.1 0.4 9.0 .8 62.5 8519.2 3.0 8.0 162.55 8522.3 4.2 8.4 62.6 8524.5 4.3 8.5 62.7 8527 .3 3.8 7 .9 0 62.8 8531 .0 0 9.3 0 63.0 8534.9 1 .2 8.6 1 .9 * See Figure II , III for Cross Section Locations. Some riprap placement is recommended at the locations shown on Figure III . This will provide protection from erosion resulting from the generally high 100-year velocities of Gore Creek. The finish floor elevations of all the proposed building sites (indicated on Figure III) are more than 2' above the 100-year floodplain. On the basis of the foregoing analysis, we have concluded that the pro- posed overlot grading will not have a significant impact upon the flooding hazards to upstream or downstream properties. • -5- IV. REFERENCES 1 . Gore Creek Floodplain Information, prepared by HYDRO-TRIAD, LTD. , Lakewood , Colorado, June 1975. -6- APPENDIX 1 4. ****************************************************************************MMM GORE CREEK 100 YEAR FLOOD PLAINS OCT 1979 __ _ _ _ ._ HYDRO«TRIAD, LTD__-•.• - WATER RESOURCES ENGINEERS_ _ , DENVER, COLO SUNDIAL . EXISTING FLOOD PLAIN *** N DISCHARGE WATER ENERGY VELOCITY ALPHA VOLUME AREA AVG VELOCITY IN SI CFS SURFACE LINE HEAD AC/FT ACRE 1 2 3 4 SEC NO. 62.300 8500 . 001 **** . ._1___--1.423_,.0-._-85-03..501 __ 8504.373 _ 0,871.- . . 1. 057. . . 0. . 0. 3. 55 7.61 . .3.961 1--SEC NO. _. .629300 .... ..- 8500 . 001 **** 1 1423,0 8503.541 8504.394 0 ,854 1 . 058 0 . 0. 3,52 7,54 3.58 SEC NO. 62,400 • - 8508.501 . .. SUPERCRITICAL TRIAL NO TRIAL WS COMPUTED WS CRT G/ 1 . 8512. 021 8511.492 2._ ..._ .-- .8512. 060 8511. 273 ****_.. 1 _._' 1.423. 0 __-8512.060 8513..271 . . 1,211 . 1. 044 09 0 . 0 ,44 8,97 4, 84 SEC NO. .._._: 62,500. .. 8515,900 **** 1 1423. 0 8519.152 8520. 097 0.945 19146 0 . 0 . 3900 8. 01 0900 SEC NO. 62,550 ' _ 8517.501 .. **** 1 1423 .0 8522,318 8523.275 0 ,957 1 .117 0 . 0 . 4 ,22 8 ,18 0 .23 SEC NO. 62 ,600 8520 ,001 . SUPERCRITICAL TKIAL _ N0. TRIAL WS. .COMPUTED WS CRT 0/ _-.._ _ 1. • _. . _—_ 8523,906 906 . . 8523,800 c 2, 8523,945 8523,789 s, **** 1. 1423 , 0 8523 ,945 8525,498 1 ,554 1 . 017 0 , 0 , 3.97 10 , 03 0, 00 SEC NO. 62,700 8522.701 **** 1 1423, 0 8527,388 8527.761 0,374 1. 013. 0. 0. 2,45 4 ,92 0 , 00 *** N DISCHARGE WATER ENERGY VELOCITY ALPHA VOLUME AREA AVG VELOCITY IN SUB CFS SURFACE LINE ' HEAD AC/FT ACRE 1 2 3 4 SEC NO. 62,800 8526, 001 — ' —Y + SUPERCRITICAL _- _.. _TRIAL_NO__TRIAL. WS COMPUTED WS .CKT ..0/ . 0 , . .8531, 007 8528,466 1, 8531, 046 8528,470 **** 1. 1423, 0 8531 , 046 8532,386 1,341 1. 000 0 . 0 , 0 , 00 9.29 0 , 00 SEC NO. 63, 000 - 8531,201 __ **** 1 3423, 0 8534,927 8536. 025 1 , 097 1.217 0 . 0 . 1 . 21 8,55 1,94 // XEO BACKW • ******************************************************************************* ? V ? q.' --- -- GORE CREEK 100 YEAR FLOOD PLAINS r1 __ _ HYOH0-.TRI_AD, LTD._-•. ..WATER RESOURCES, ENGINEERS OCT 1979 DENVER , COLD • SUNDIAL .. REVISED FLOOD PLAIN *** N DISCHARGE WATER ENERGY VELOCITY ALPHA VOLUME AREA AVG VELOCITY IN SUBS CFS SURFACE LINE HEAD AC/FT ACRE 1 2 3 4 SEC NO 62. 300 8500, 001 **** 1-------.1423,_0_. -8503501 --...8504. 373 - _ .0 , 871 _ 1. 057 -- -. ._..0... . . . . 0 . 3.55 . ..7. 61 .. 3.61 . I .. SEC _ NO., _.._-. . 62.300_ _ _ 8500 . 001 **** 1 1423. 0 8503,541 8504. 394 • 0, 854 1. 058 0 . 0 . 3,52 7. 54 3.58 SEC NO. 62,400 8508.501 ._. . . . .. SUPERCRITICAL TRIAL NO TRIAL WS COMPUTED WS CRT Q/ 1. 8512. 021 8511. 492 2. .8512, 060. 8511.273 . _ ****., 1 . 1423, 0 8512, 060 . .8513.271 - . 1, 211 . 1._044 .. . • . 0. 0 . 0, 44 8.97 4.84. _ . SEC NO.. ._ 62.500 8515.900 **** 1 1423, 0 8519, 152 8520 . 097 0,945 1.146 0 , 0 . 3, 00 8, 01 0 . 00 SEC NO. 62.550 - -- 8.517,501 .. **** 1 1423,-0 8522.314 8523.310 0 /996 - 1. 123 0 . 0 . 4. 29 8,36 0 , 00 SEC NO. 62,600 8520 , 001 **** 1 . _ 1423. 0 8524, 515 8525,626 1. 112 1. 020 0 . 0 . 4, 29 8. 51 2. 04 A 1 F 4- -- SEC NO, _. 62.700- ._.. . .... ... . . .- ____. .._...._.-- - - _ .. . . . 8522.703. **** 1. 1423,0 8527 ,341 8528.293 0 ,950 1. 017 0 . 0 . 3,78 7.85 0 .00 SEC NO. 62,800 -.._..8526.001 . . .. . .. SUPERCRITICAL • i *** N DISCHARGE WATER ENERGY VELOCITY ALPHA VOLUME AREA AVG VELOCITY IN S CFS SURFACE LINE HEAD AC/FT ACRE 1 2 3 4• -- __ ---------THIA.L--N0- -TRIAL. WS .COMPUTED WS CRT Q/ . -,---. .---- .-----._0 . ... 8531,001 . 8530 ,693 1 . 8531 , 041 8530 ,660 **** 1 1423, 0 8531.041 8532.386 1,346 1. 000 0. 0 . 0 , 00 9.31 0 , 00 SEC NO. 63, 000 ._. . .-. . -.... ... . . . . . ... ._. 8531.201 **** 1 1423, 0 8534.947 8536. 048 1 ,101 1.215 0 . 0 . 1 ,20 8.56 1 ,94 // XEQ BACKW r 1 v un c 1 . .. ,. HYDRO-TRIAD, LTD.1 , _ • / 1 •.; '. - -, - - _-_- ,. • ___ ,.......„-_,...: - - - _ , • , .. .. _.- -, ,, --,-__ ,_...._.., _.. . ,. • „ ...;;,) ,-,•/ , ;, , , -. : - x„-s.,-0-7- - _ . — , ---i r- ,- . ,,. Y,,-,•_,_,...-7-,-;,- ,-,--,- •, // , ! .,,-- '..• '-- , . ____ • _ . , ..,, - /-- ,,,,.._ • ;-'2;,,- --- =- _----_,/,, ._--;„:. -•-•, i ,,,,-,-„, ;\,-; . . ,,....-,/---___-,,. .- , ,, . ,„,• .., , -,•• . • //-,./// 7,• ,-/ • - /- -- -,•; , • -------,,z 7. ,, , -, ' ,.. . ----Z-,., --: ' • . \ - \ - ' •••..•-_,_ %,... •'• ....- ,,, •■ng.ca' 7 \, ', . .--- /7 --„-- ,;,. / ,/ .■,, ',.st__\ - ,, .. ..;_:;__, ,,,-- •,',---- ')/-:;_ _--;;L:.:-_-_-_-___,; '-`,,9,,2.0„.,.; ', %...) '\ ,,•,, ''', ...W,,///,/',,/,/, -"- /i-/.. / - '-'---,\ ..‘ , ‘\';%, . • ..\' \- .-I-;----=----7- ----:--:--:::<//i//,/,/,',//21_, ;j r ' \,„.. ''‘,\ 2 , /1' -,,,A /, f\ •,_ -...;_---, , --... ---,---.„;-) '' ■, ' - ', ----',„_-__/ --",__ • — .,:,--/ ,p-,a•,n?-ti' ‘ . / ' {a - --,.-, ? , ' ,, 2 s:-.--• -- jk\-.----5-7-- ' ------' , _ a ,, ,,, .,-,-,-- -..,. ,.,,,/////,,,,/ /7'6,,:',, ,,', ,s \- ''''', -`'--:.--.•.„‘_'---''-_-:\\.-2- ..\.‘‘`\ .-,:'''-','::----.-, -% ---.t)-Rv''':':-----:1:L.:— ),,,. - --. -.s- -, '''.1',.. ' ,,, • ,:-'-i_ \''-- , : _.2 s ' • ',' - _ -- - ' • .1:-_._.2 . '. ' _-_,-:--71-17,.1 -',,1%;.-.7-._------'-'"' ,:— . , •----. , - ._13460 , N s •ii 11 n ,.......\...NN\._ _ . . . .. -- .._. —___—_,--i----- -:.....,.. .',.--_` : - ..,•.--._ .---As-__ --,.. , ,\ . \ --„.-, ..s:',-, ,_,:.--_,' _ L. -,,, -. :400 - . -_ -_-_-/-:---,.---_,.-_------.,/,-.-_-. ------, , Meadow Drivei, --1 • ,,bridge (4D 0,'• '- .._ „ __--.1 - . 4: )E. _ 2 .; __..,•_ ,, c-S s, _ - c3 ,.7e / -- - - -- 13 ' , -"- • . 18.- :- ,." . Gm'e ee - --;,---:;.---•-—,--- -- ;,'----r" ' ----=--- -3-'SUNDIAL SITE • -- -- - - . 8M ' Mai :786 cv ct) 0 0) k),■ , ) I Drive bridge - . - '. -.\\ --' , --.--'.•\•\c( c4,, ;- .7--, . - .4; . •7,-•,.,',C, . , l• • __ . . ,,,, ',\\\•, ,,\,-ci;•-• .,:ir,- \ -•;,\ . ___ • , . : :,, .•., ,- -__.•-7.-. ',..k--:„ ..- , ,•,,,,_-_,,, • ,-,,----„,.. , ').),, ; ' , ! , 11 \\.\\ :•:---•,,, ,-',, ',.\c, (- - - --• . , -, I, :, •'‘','• k \\\• : , . • . \),))/-.7- - : . • , . ki ri/---,--__-_---- „ ,,: `,' _ :IT:---__:,:'-'-'''', ,'-',' ,''' ' .\' %''- '‘ ,-'' ', 1 /. , \ ' - ..\% 7)//, /,/, ///,' / (//,,---- - - , ,,,,. ; li„ • ' I/ , '' '' '/,''' -'-:,----=--, '''''', .',;,.‘' '''' ''' s ' '.- \ "4 ....,' I-' ( 'i/i I,i i I,'\;, t ''\\ \ \.\, '. ., - ,, ' 1,,I, , ,„ i ', ti n;; ,•i, :/// ;,' ,/,_;;;;;;_-_--;-_,-,-„,, ;;;; -,,,,,,,\,,,.,....;;;,' ,,,,' ■ ; ,\V/ , .; ; ..,Ip , \ ,"7,1,// ,\\\„„\\\\;;;,,, , \\ ,,,„,;,` ,_-•,k; , , , , , :,,. h :' , ' „ I., +.-:_ .:_: /Cl‘60- :,....,' ,,',:‘.•,;‘, '\,,, ,,,„ $t -.',- \‘.'.' \I,` ', (/ t f i 1 / / /,,__ ',, '-* ' ,i11 ''II'"0 ' i ' '$r,,,,' ■• , .N. -:--..-2._------ ,, , ‘\\\ \ 0,',,, i.',', ',V, ,\\\, \\ . I ( ' W \ ( ( 17 IV' ' '--__ . ,',bi, .,*,,•...,/ ,' fr , ,.,,,',',....---,-7,-.7 -__-_:„.. , , , '‘, ! ,, i c‘ ,' \'..\\ N.J.. , , \ \‘ I ''‘\,\----)7 /i ( ,',, ;5.\,,c,, , .,„--,.. — r: - , II '11 ', 'i 0' \\\ __*"."6.. k .,)' I). i -. '‘1 I '''''''';'' ' \ ti i ' '‘2///' '''>' ' •' - ' '''' ; 11 11\ '' \\\ -., ' ''''''' \--r, 2-...3) ,i. \\\, ii il ' // ///2 '', - ''. ,„ ' .'' f 1r —'''' --',Scale: I = 2000' .,',,"/ , /X/ :/:.•,,._:, .„:/•',' '.,.' ',' .... . k. ..--_-_=.=7 -7 •(1(7 ' (( ) \ ( ,, _ - .„,„;._. ..,... .. .) ,, .:-• --. ..‘ .\ ,. — /// 7 1 I \■ ,, \ -/,... ;,_‘.:,:_,...,-:-, -:\\\,,,s,, ',...!„.,,, i , — ////,/ '/,:/ .„ '',., ' r' ' r ,, ',* ;i■^-2-:',,,, ‘.%,,,,■:------\\‘`\\\)‘\`.\\ \ \\\\ , ,\ , s..\%\ , ) ' ‘ \ \ \- -,., \\,..2,..., , \ '-.- - - ,_____.e,,,,2;„ , ,,,/,,,„ ,. .• ,•• ,; , , ,, ..f.,-,:-_-_--,---_,._--„,__•._::, , ,)),,,. \ \\,,, ,„ '-)\ ,••• , c:i , , \,,, ,\ \ -,‘ --- _ „,,,,,,•_,/,/,/,/,,,,,, -a ,, -, ; ,, \ ::-._.:-:__-_-_--.--•_. '', 1' 't', \to \'\\ '''' L 1 --„if,/,.',/' ./."',// //, ' , ' • \ '-------::.\'■ ; ', '\\s \I % .:_-_:_.. , .\\\ ■\\, ',',0,,,■ \s , 1 )1 ' • \ ‘,' '\, '' sIX\ 1 \\\ ';•'',' ' >:::'•' ---------,.2-,"- (----,=Ztel./. '. '' '--.----::::,:.-:94..Sci;". .,,,, \..\\\\ \\„\ \' ,\..\ •‘‘,‘\\, \_..12. ,,;',/,' '--, ' :, \ , ,.. ., ' `„ \\\,,,) ,n'o, \ ,„ -.7, ))) ) ,' i / / i i ■ , q— '. " '‘ ,',,,( ,'\<-\\,s`\:,\ :-..- \ Cb . ,.,.) %) ' 7',' ./,_i ( il,' •96- "I SUNDIAL SITE \ i. --- ---- , '-‘• _,;"-- •;\`.': \.\\.',. '-•-, ' ' LOCATION MAP _ . .. - ,.,- ---.-- ••- ;\-,,, ,,,,,,- - , )_ __. . _. ,--,- \ _. ,7,7----.7,---_ , -\ -77.• . !.00TOBER 1979 , , .. .._ __ .. . .., .. BOB POLLARD !P71.• pENNER Management,Inc. 1795 West Warren Avenue Englewood, Colorado 80110 Phone: 303/935-3591 or 934-2251 - YDROmaTRIAD LT Consulting Engineers Lakewood Colorado ! t yy yet �b Ham' s i5 . Application Day. ::..',tea M' 1981-- -;6-( 4/ TA Zif APPLICATION FORM FOR A VARIANCE . I . This procedure is required for any project requesting a Variance. The application will not be accepted until all information is submitted. A_ NAME OF APPLICANT Penner Construction Management, Inc. ADDRESS 17.95 W. Warren Avenue, Englewood; CO fd// v PHONE 935-3991 B. NAME OF APPLICANT ' S REPRESENTATIVE Inter-Mountain Engineering, Ltd. • ADDRESS Box C-100 , Avon, CO 81620 • PHONE 949-5072 • C. AUTHORIZATION OF PROPERTY OW E . Ulm/ A ��,. �® SIGNATURE , _ _ • ADDRESS_1795 W^W]arren Avenue, Englewood , CO _ PHONE 935-3991 ._.__. D. LOCATION OF PROPOSAL ADDRESS Main Core Drive LEGAL DESCRIPTION lot block Filing (unplatted) "Sundial Phase II � . /OE. FEE. $100 . 00 plus l5er= for each property owner to be notified. 5j; F. A list of the names of owners of all property adjacent tb the subject property. See attached list. 1. Georgia E. Kelley, 3144 South Columbine , Denver, Co. Lot 8, Bighorn Subdivision, Fifth Addition 3 °1- 946-U Z 946- 2 . D-J Land and Cattle Company, Lot 7 , Bighorn Subdivision , Fifth Addition jS / 7 f� e c �,2kE 1 �� 6, 3 / / 3 . Charles Madison, Lot 7 , Bighorn Subdivision , Fifth Addition " �- 4 . John N. Yates , 770 Grant Street, Denver Co . Lot 6 , Bighorn ,S% z01- Subdivision, Fifth Addition 3 yG 5 . John B . Thomas ,ALot 5 , Bi ghorn Subdivision, Fifth Addition 6. Tim Garton, Box 705, Vail, Co . Lot4 , Bighorn Subdivision , Fifth Addition ; zc4 ��e j fo 7 . Robert E. McCraith,/+Lot 3 , Bighorn Subdivision, Fifth Addition 8o/33 8 . James I . Summers , Rt. #1 , Box 541 , Conifer, Co .nLot 2 , Bighorn Subdivision , Fifth Addition 9 . Fred Gold , AKA. Gold Duplex, Box 514 , Vail , Co. Lot 2 , Bighorn Subdivision , Fifth Addition 10 . Helmut Horn , Box 340 Vail, Co . Lot 1 , Bighorn Subdivision, Fifth Addition 66603 11 . Charles Hussey II , 111 West Monroe Ct , Chicago , I11Lot 1 and 1A, Bighorn Subdivision, Fifth Addition 12 . Martin Blitstein , Box 2123 , Vail Co . Lot 2 , Bighorn Subdivision, Fifth Addition 13 . Roger Tilkemeier, Box 742 , Vail Co . Lot 1, Gore Creek Meadows Filing No . 1 14 . Vail East Townhomes , Box 705 , Vail , Co. Unplatted - Legal Descript 6(4o): _ .// fi i Cqs, 4 1'Ll dC i t ENVIRONMENTAL C(�`M1SS1C� Monday , September 28, 1981 2:00 ma 1';ork session to discuss variance procedure and review by PEC. 3:00 pm 1. Request for a roar setback variance and for a variance for a setback from a watercourse for lot 1, resub of lot 14 , block 4, Bighorn 3rd. Applicant: Heritage Company. 2. Request for a front setback variance for lot 5, resub of tot 14, Bighorn 3rd. Applicant: Heritage Company __.._,. 3. Request to vacate a lot line between parcels 4 and Sundial Phase 1, part of an unplatted parcel in Bighorn Subdivision Applicant: Benchmark'` Homes of Colorado. 4 . Request for a side and rear setback variance for. lot 2, Cli.ffside Subdivision, part of Lion's Ridge Filing No. 2. Applicant : David L. Cole. 5. Request for exterior alteration and modification to the Casino Building for the deck area to determine the amount of office space on deck. Applicants : Carlos Agostoni and James J. Sprowis. 6, Request to amend the Parking (P) District to permit by conditional use public uses that are transportation, tourist or town related and accessory type uses. In addition, to amend the Public Use District (PUD) to permit by conditional use, public uses, office and commercial uses that are transportation and tourist related and dwelling or dormitory type units for employees of the Town or special district. 7. Request to amend the non-conforming section of the zoning code to permit restoration of legal non-conforming structures that are destroyed by fire or other calamity or by an act of God. Applicant : 'Town of Vail . 8. Request to amend the official zoning map of the Town of Vail in accordance with Section 18 of the Town of Vail Municipal Code as follows: (Each of the following properties belong to the Town of Vail .) a. Change the Ski Musium, lot 6, Vail Village 2nd Fi] ing from Public Accommodation (PA) to Public Use (PUD) District. h. Change lot 10, Bighorn Subdivision from Two Family Residential (R) to Green Belt and Open Space (GBOS) District. c. Change Tract II. Vail Village 1st Filing from High Density Multiple Family {IIDMF) to Public Use (PUD) District. d. Change lot 25, l,ionsridge Filing 3 from Primary/Secondary Residential (P/S) to Public Use (PUD) District . e. Change lot 40, Buffer Creek Subdivision from Commercial Core Ill (CCII1) to Public Use (PUD) District. f. Change lot 10, Vail Village 2nd Filing from Two Family Residential (R) to Public Use (PUD) District. g. Change lot 3, Resub of lot 1, block 1, Vail Lionshead 2nd Filing from High Density Multi-Family (I-IUMP) to Public Use (PUD) District. h. Change Tract E, Vail Lionshead 1st. Filing from Commercial Core II (CCII) to Public Use District (PUD) . i-, Change Donovan Park, a parcel of land .located in the NE 1/4 of the SW 1/4, and the NW 1/4 of the SW 1/4 , Section 12 Township 5 South, Range 81 West of the 6th P.M. , Town of Vail , State of Colorado, from Residential. Cluster (RC) and Primary/Secondary Residential (P/S) to Public Use (PUD) District. j . Change King Arthur's Court, a parcel of land situated in the SE 1/4 of Section 12, Township 55, Range 80 West of the 6th P.M. , Town of Vail , State of Colorado from Low Density Multi-Family (LDMF) to Public Use (PUD) District. k. Parcel B of the Annexation Plat of Forest Service Property, annexed by Ordinance #7, 1980 as recorded in Book 302, page 852, Eagle County records from Green Belt and Open Space (GBOS) to Agriculture and Open Space (A) District. 1. Change Glen Lyon Stream Tract, a parcel of land located in a portion of the N 1/2, NW 1/4 of Section 12, Township 55, Range 81 West of the 6th P. M. , Town of Vail, County of Eagle, State of Colorado from Special Development District (SDD) to Public Use District (PUD) . m. Change Pitkin Creek Tract, a parcel of land lying within Section . 11 , Township 5 South, Range 80 West of the 6th P.M. , Town of Vail, Eagle County, containing 19,566.40 square feet of 0.449 acres more or less from Special Development District (SDD) to Public Use (PUD) District. Published in the Vail Trail September 25, 1981 MEMORANDUM TO: Planning and Environmental Coimnissi.on FROM: Department of Community Development/Peter Patten DATE: September 22, 1981 RE: Minor subdivision request to abandon the common lot line between parcels 4 and 5, Sundial Phase I. Applicant: Benchmark Homes of Colorado REQUEST The applicant requests the abandonment of the lot line separating lots 4 and 5 of the Sundial Project, Phase I. There were 5 duplex lots, each of 15,001 square feet of site area approved along with the recently completed townhouse project. None of these lots have been developed, and we are now getting requests for development approval on these lots. They are all zoned. Residential (R) and are all allowed 3750 square feet of GRFA. : The applicant wishes to unify the development of these two lots by building 2 duplexes separated from each other by a "common" garage facility. The objective is to unify development of the two lots by similar designs and to best utilize the areas of the two lots. The density and GRFA is not affected by this proposal . RECOMENDATION The Department of Community Development recommends approval of this minor subdivision request. Developing the four units at one time will mitigate construction impacts on the site (between one duplex and the adjacent site) . The lot line abandonment allows more of a clustered-type feeling to the two duplexes, more closely approaching all the surrounding properties (Vail East Townhomes and Sundial Townhomes) . Moreover, this proposal may allow the western- most units to be pulled away from the Vail East Townhome project which is in close proximity. Date � ! APPLICATION FORM FOR A SUBDIVISION REQUEST A. Name of Applicant - I 410 Address 44 40 L✓ ' ,+ 440,,e accif -' B. Name of Applicant's Representative i.40,44/ , Ago,404,vs j 4,4 Address Ago, A004 2400 Phone ° C. Authorization of Property Owner Signature / _ Address q -/h- w� ti,, ,:I I( �1 j' Phone06 000 D. Location of Proposal /Lot Block Filin. "= �,4/ E. Fee $100 tgi,�'� F. Type of Sub division: (check one) Major (involving more than 4 lots) 440/Minor (involving 4 or fewer lots) Duplex (splitting a duplex structure and/or lot) G. Procedures for major and minor subdivisions are as defined in the Town of Vail Subdivision Regulations on pages 9 through 20. H. Duplex subdivision requires the same information as a minor subdivision with the requirement that the following statement must appear on the plat before receiving Town of Vail approval: I. For zoning or other land-use regulations of the Town of Vail, the two parcels created by this subdivision are deemed to be one lot. No more than one two-family residence shall be allowed on the combined areas of the two parcels. Allowable Gross Residential Floor Area (GRFA) for the two-family residence shall be calculated using the combined area of the two parcels. J. Time Requirements: Major and minor subdivisions must be approved by the Planning and Environmental Commission. The PEC meets on the 2nd and 4th Mondays of each month. An application with the necessary accompanying material must be submitted four (4) weeks prior to the date of the meeting. Planning Commission Town of Vail 75 South Frontage Vail , Colorado 81657 Gentlemen, Our corporation has no objection to the abandonment of the common lot line between parcels 4 and parcels 5 of the Sundial Phase I Subdivision in the Bighorn 5th addition. Sincerely , Thomas S . Heesch , President Landmark Properties , Inc . C,1,"1'1 0:‘,1 . , _ 2 :LOT !LOCK AODRESS locoft,cei of utilities, whether they he main trunk lines or proposed 3ines, must be approved and verified by Vile following utilities for the acc nlp anyi ni . Authcri-bed Date $i#n4turc ruc — Mountain Bell fri< 1"" , ) ,t) Wrstern, Slope CaS - - _ 44,„4,424,4_:,H744,,4 S mvico Uentny Holy Cross '',31ectrio Assoc. Cuh:o T.V. / 4\ Al;.1 Water ead ntion District 1,4„ • ? 4 db/not relieve the contractor of his -:..-i- sponsibi:1,ity to obtaln a street ..nit permit from the Yuxp. of ail, Department of Public Works and to obtuin utjiity looatiohs bofore diggiwg ih any public right- -fiay es easement in the Town of Vail. A building permit not a : et cut permit . A .street cut permit must be paately. This form is to verify service availublity and location, This should be used in conjunction with preparing your utility plah and scheduling installations. "1. ilo FIGURE .III 0 iici b; .7 :: 6:\\.: \6:4\ 8(i-.\\, 6i ,(") * —_.4.....,\ \ \ \ I,; ,——--" . .' '1 _,___, ., . - . , ,_.- 7721) ‘... \ ./- , _...- '\\\\:\\\*Sec. 62. 5 -% / Z \`'N \ ., ''\\ \ •.\ N"'".,. Nil li N. i • . / 7(\ ,/ (,- ,\, \\ ' N ' :1:\\NNN/ 'L85I9.2 � � - , I N � ':::''''''`, !.'" \ 4 \ / ‘ 's07 110° 1 ''.. !,.:07././88519. 2 �_;�' �' �. \ � ��-- ').\.:,, \\::\\1/4\\\,\ \ \ /4„ •, [. \ N, o Itir r ) ~-,,,,,,,,..\\\)s, \ . . 1,, 11111111111111 ''''''■ - \. - • 4■'.... 01 /41\44,s, - `" N / \ \ \ \ See. 62.55 ll \ \,�' f ,� R 8522. 3 / \ �.` r; `\ 7 I ._ , Q) f� LEGEND 1 , ,,,,,,)," --- ._ \\N,AP i '' . ' fb ��_ Revised 100 year floadplain ___ Exrst. 100 year f/oodplain \ ' Section number 1' � Sec 626 (/' k, , ' �- - r' E 8524.0 Exist 100 year water surface elev R 8524.5 Revised 100 year water surface elev. 100 year flood- \\)1 Sec. 626 -- �� plain w/ revised �� \ E 85 23.9 grading � \'. \\ R 8524.5 \ s� \ '� \. \ \� -11C\ ' '\ 100 YEAR FL0 D- .\ �` - ` N \\:>%•.\TN�. /� ��.. /21 \\,-- ----- _ \ . / PLAIN W;f EXIST. :\f„ , `,, e , GRADING `.. `'� `• _ Notes . .. ``,- ,--_ ..R I� . / - y. / LI 71E1 1 . Base Mapping supplied by Intermountain Engineering, Avon, Colorado . - _ • '—Ala,—,-...- \ - .\. / / ...0...../10) 2. To adjust to USGS datum, add 8048.44 to noted elevations. � •4 '�� ,,.� 3. Any mapping discrepancies resolved in favor of iGore Creek Floodplain Sec. 62. 7 , Information Study Mapping (see report) . \ � ; . ;� /� ; E 8527.4 , i t �.it.i/ 4. Floodplain shown based on Gore Creek Floodplain Information Study R85273 `"- ,,�''/ i Mapping. 0 j- 5. Provide riprap erosion protection from Section 62 .5 to Section 63.0. \ -•-•""Use evenly graded l2"-18'" rock, placed l8"" min. thick over area subject ,_ - /I : - ><----/► to erosion, up to 100-year water surface (revised grading) . Y ..-� S NN -.... ' f / low...................... - - - / 1 SUNDIAL DE VELOPMENT ,, :1, NN ., �� SITE PLAN° 77..„F, <;M r. _ 1 _ HYDRO-TRIAD, LTD.62.8 p.{ Lakewood, Colorado R 8531.D Sec. 63.0 E 8534.9 R 8534.9 ( A OCT. 1979 • a • NMI 4 Di VR box 100 department of community development vail, colorado 81657 (303) 476-5613 July 21, 1981 Robert L. Pollard Project Manager Penner Construction Mangement, Inc. 1795 West Warren Avenue Englewood, Co. 80110 Re:` Sundial Dear Bob, This letter will serve as certification that the Sundial project has complied with the Community Development Department's request to confirm that the modification which took place to the Gore Creek 100 year flood plain are built as per the original report from Hydro-Triad dated October of 1979, The July 7, 1981 letter from Hydro-Triad by Kurt Mahnken confirms that the "water surface profile generated from these sections is generally in agreement with the one for previous conditions described in our report dated October 1979". The report of July 7 also states that Hydro-Triad feels "that the present work correlates well with our previous study". The two requirements of the recent study were that smaller rip-rap be installed as per the original report and that the boulders deposited in the creek bed by the rip-rap installation be removed. I have 2 series of photographs, dated 7/11/81 and 7/17/81, respectively, which show that these 2 items have been complied with. Also, I have done on-site inspections verifying this. Thus, the Planning Staff is willing to release the hold on the Temporary Certificate of Occupancies that we've had for several weeks due to the floodplain question. It's my understanding that several Temporary C of O's have already been issued at this point as per my verbal approval last Friday, July 17, 1981. Thank you for your cooperation in this matter. Mr. Broderick has been most cooperative and prompt in working with me. Please contact me if you have questions or comments about the project. Sincerely, A, PETER PATTEN JR. Senior Planner cc: Chuck Broderick, Steve Patterson PLANNING AND ENVIRONMENTAL COMMISSION /= July 13, 1981 3:00 p.m. STAFF PRESENT Scott Edwards Peter Patten Duane Piper Dick Ryan Dan Corcoran Larry Eskwith Gerry White Betsy Rosolack Jim Morgan ABSENT COUNCIL REPRESENTATIVE Roger Tilkemeier Tom Steinberg Gaynor Miller The meeting was called to order by Gerry White, chairman. 1. Approval of the minutes of June 22, 1981 , X2. A request for a setback variance to make legal an existing building which encroaches 4' into the side setback on 5040 Main Gore Drive which is part of an unplatted parcel in Bighorn titled Sundial Phase II. Applicant : • Penner Construction Management, Inc. Peter Patten presented the memo, explaining the error made from the destruction and subsequent re-location of a concrete monument. Jeff Spanel explained how tl. survey error came about, and Dan Corcoran added explanations regarding subsequent surveys showing other property corners in the subdivision and agreeing that an honest error had been made. Tim Garton representing Vail East Townhomes told of his concern of the dyking of the property and felt that it would affect their side of the creek, Peter stated that he would discuss this with Tim. Dan moved and Duane seconded to approve the request for the setback variance. The vote was 5-0 in favor, unanimous. 3. Appeal of administrative decision concerning the color of a residence on Lot 20 Potato Patch. Applicants: Jonine and J. J. Collins. Larry Eskwith explained that the Collins had had some problems with their color and were told by Peter Patten.that their only option was -to come before the DRB to appeal for the change n color, or to change to the color that was listed in their original presentation. The Collins ' did appeal, and were denied. However, he (Larry) was of the opinion that the PEC did not have the power to hear this item. Scott Edwards moved and Jim Morgan seconded that the PEC did not have the authority to hear the Collins appeal. The vote was 5-0 unanimous to acce t the fact that the could not hear the p t y appeal . S 5.,�..,'.--l b C 9l sr,; f,v.'t'`�,.,-.z&•t3 a t f f!a-t�st zt",..-;. a s>{r 4 .„-^'�„'r:ti�,x>f€�/r f.,c°7,r.,'.4,�'$f-h"t,fi1✓t rlF'0,J'..,w y r{h P-'''.;s r(a;t}>Y y'.e r r a,s#:°t s,-'���.-,-J•''�.,3.y.zr,,>';S r r:.r?+x s,.4�„.�"_„r..;r.:-rl.o�,.„<,";.'.ur.,>,�,..:..'..,'y`s,.r”;i`;v4f,'zrr. :r. 2.�✓-'."r;'"' r✓,; ✓ i r, r✓ ✓> ' ” 1 x m°r-„.. s , ,^m7,77.7,' c' r , ,sh3 c n s y rX x ✓ r rf n{r 4 f `. / � s s t. .i t�� tY:=4 '- r r : t3 : � x rc f ! i t Y r ul x„0 7 . i r Z,.x r- s f , ri � 3r ✓ v s � =, /X t m" . et7 f ts x iff p h xY :"kt p3 5�n F �k tr✓: , t t „, f* %-,x r/.v r t t t f. r :.,,t. �^ ''? Y fi1 r am 2 rw r�✓ ° 4- .4,u , a � 7. v f " t�h r s 6 r k IJ v - rl p& v -✓xl ,4. �R3.r A-3.-rT e �r ,� �`�& �l y' y s k�xr Z r l i ?'NO,-- x �f R�J �A0r§-' _tt�Vr�lx t f j�y„t #< � oi k � r/,,,a #.,�& `o f i ,, ,j , y r i ?, x:? : °s t 3 . s"x 3 �k x. s; . � , t . ; � � „ � , - ?. a o I x �� 61 . i � r / , , p Y :1 ig ;.rd„, „,j; Y rfi � f 0,, .�t y1 r ri7l , na<9s €., ,,„,L 2 t ,a 5r, 0,,,f t X+ /t s r z c yY .E ,,,3z{ r.. w�.f 7 . fy€s 1 E r"f Y .i�ce ,f�i . ,r, 3x"` �o - f r ,vp„ s az ci` v ✓t . r h srr? z ? / x z ; �0{ � � r�r�l�4� ? , Z f / f td:� M r r, ' !Nr h, r y , ,ti rq r , t5 � ,r � , " � n�45 / ; i f`7 t r s ., . r f .I r t Z A}y>j t p ”tI x # y ,- i' r�x 11„,�s d ,�Y?F k 3�44.0`s .4.1;.� ,A � r r ,, x r y { fir ,2 , /.'-,, C 4 6y t a r F z 3 a y i m #3 r4010 ” {� o NH % s ' ! r `� e u.#; . ,��r r.�: } � x - r 4 / . Ai2d?" 1?�? �i .; Att c f a � Fr r , „ „ ”s r � wa Y 4 v 0 teT Nr 1c., t k' ��d `I �W Vi*� .N, r .o r:, fir x?F 00{M ?s. /� r a s 4r 5 x � r , } t ts � "�7~ r � � dt I a Ya "F tm r � S.s y i 440,:te :ot I YY s 1 sG 7^ r r � . k u r 7� VI i �wr i >yr/ ,1 a ;-#04 a A $���� a� a Y ",f,, ;�,";;. n �n , r iY �� s x tvh r" ^fg s f � 1,' Y � j;1r ✓ € ,, /`,. .. i !l vrr �<°- . ; .'F, 3� y , ,t � , �� h r �N • 5J t 'R r fk f f � 'M,/L #I# 4.1 1 �0 . z� � 43� itAi , 2 1�4 t�1 l� r } ✓ 4 Y P w t " te f r s � ; � � y F ,'k / r . Y g Y 0 5 r 1 N r t r i le H t 'N ZrJ . ` ➢> - 2 A, , � sf:%H : .0 g �s Z 3 r : u l 4 � /I�f ,g1, 4 : k '(:. >* I 4 fe f,-� . ,, h � ,, 00 4 t ?v ,%^ F,, # s� e r tt ,Fr 9 Y, . JYo , 1 ' 7" 4 { „, ; f � . � ,: r,- r� c r a� vkk.* v,tub� o r ie";: t s MA s t 4 y 1 0 �!sY �A. C;.,w ,..'¢, t�1A �. q �� ,��,, r✓�,, 4�r , 5s,✓-e 0„?:, r' ,t ,{x 7 ' rr r 3f� / � r ,: �5:. ,l& w,r. � ,fi „�, �,� , R$.P•73 .x ll ,,,/r ���' x 1. rn z � nr c a1 �..; T.a�zc Er$r � . � �� a 1 '! ef� 1y? $���Fr � 7 A -t / �l 4 ✓ - 1 ? 004 r0� ✓ : f � ..°Y z,4��. �SF F t Ri T! > a ,1. . �" �°,,�7 f y � ,a a a! �3,� 'r✓ Yt^iy:� �i ai Y C � t ; ; , „doff*;9� �lk.t , a.. ' °'V��,*! ,3�,n? � a r ' aK� 9 tA AO e § / s lzx t.0 h � r ✓ , 8 ,,,,,,#p>a �„, .' lt 4:.r yf fY. s A' �r Ar l.? <. 1 x � ! V 7 { t r z ua f<r a, i s./? :. „ x �.k„�. k,. � ,r u•r 4 L .,.. `,�-1,,,,',""',,,,i' "1" s ?. B� ' R ,a 't 1. . a r Y s ',v� u , fl L � o " �y ,-�, fr , 1 r s z r k rR F r <r � ts..! „ aN s / e , l ” , ,0 z A £WIN OVA {s , t r / ✓ 9 r r, r Project Application tt, Da t e ,- C, Project Name: mac. � ?; / �e If, '�-- ., t" #h '{ �, �` Project Description: R � - " Owner Address and Phone: i fir' lc °`µ 1 IZ �� mom ' € f t' t2' <.F? `,cC r, s �r �`c/ � Architect Address and Phone: Legal Description: Lot f, Block Filing Zone: Zoning Approved: - 't- =. "/ ..- ,-/ ''4 >° ' Design Review Board 7 a Date ! 2 i Motion by: ./ Seconded by: ,./ `''-. '/t °` . /`>' /,134 APPROVAL DISAPPROVAL W ia 6flae We31,41 4*'-'''' Summary: - � ? r ,.t /1 L Zing Admiryrs` -tor Chief Building Official Date: Date: the printery/vail DANNY L. BROWN u� • ■6unstructagement,Inc. 1795 West Warren Avenue EngEeWOOd,Gotarada 0114 Phone: 3031935-3591 or 904-2251 • • • ! - 5 1()k) lc) -X vim (pig-11\1-re b p/`J QC st G���t�• SFt)E Of _Sc4-J AL vu1N�a, t,eS 5 a 0 Yf19-1`N Gvrze b)a;_ e. VIA'‘i 1 �._£O[o(t.oDit j Ot {I box 100 department of community development vail, colorado 81657 (303) 476-5613 September 23, 1981 Thomas S. Heesch, Presdient Sienna Properties, Inc./Landmark Properties, Inc. 6701 Emporia Street Englewood, Colorado 80112 Re: Sundial Dear Mr. Heesch: This correspondence is in response to your request for a status report on the Sundial project concerning the setback problem, the flood plain problem and the certificate of occupancies. I would mention that neither I nor the remainder of our planning staff have received either phone calls or written requests of information from you that we are aware of and in no way are we avoiding any requests for information. I would suggest that your problem in communication may be with the people of Penner Construction Company, as they have been the people we've dealt with all the way through the development of the project. The setback problem, evidently developed from a survey error, was eliminated by the the Town's Planning and Environmental Commission's approval of the variance request at their July 13th meeting of this year. This was a variance request of 4 feet from the required 15 foot setback, resulting in the westernmost building being 11 feet from the property line. Thus, the setback problem has been resolved. The Community Development Department and Public Works Department requested the developers of the project to verify that what had originally been proposed for the flood plain had indeed been built. I worked closely with Mr. Chuck Broderick, Construction Manager, on this, Hydro-Triad was re-hired to verify the as-built rip- rap situation. They made several recommendations on some minor work yet to be completed, which was completed, and said that other than that, the existing situation was alright. So, the flood plain problems have also been taken care of as of July 21, 1981 . Sundial -2- 9/. 31 There have been temporary certificate of occupancies issued for the following units as of today: Building A units 1, 2,3,4 Building B units 1,2,3,4,5 Building C units 1,2,3 Building D units 1, 2,3,4,5 Building E units 1,2,3,4 If you have further questions or would like copies of correspondence, please contact me at my office. ) - Sincerely, i A. PETER PAJTEN, JR Senior Planner APP:bpr Y, �r September 18, 1981 j / Building Dept. � /� ' Town of Vail /. ; Box 100 Vail, CO. 81657 Re: SUNDIAL TOWNHOMES Dear Sir: I am President of Landmark Properties, Inc. and am also personally liable under the construction loan agreement for the Sundial Townhome project in East Vail being constructed by Penner Construction Management. I personally saw this project through planning and zoning with the Town of Vail and had a good relationship with you at that time. I am having a problem getting a complete status report on the project. The last information I received was that there was a property set back problem on the west end of the project and a possible flood plain problem on Gore Creek. I was in Vail September 12, 1981 and noticed that landscaping was being done and that a unit or two had been moved into by purchasers. Could you please give me a brief update on the availabliity of certificates of occupancy and on the items mentioned above, especially since my friend and I have purchased unit E-4 on the western most end, has the set back problem been resolved. Please send the information to: Thomas S. Heesch SIENNA PROPERTIES, INC./LANDMARK PROPERTIES, INC. 6701 S. Emporia St. Englewood, CO. 80112 Thank you so very much for any held you can give. Sincerely, /7.����` , Thomas S. Heesch, President 11 6701 S. Emporia St. , 234 .vewtee&W y'® Englewood,Colorado 80112 ® (303)740-7801 0:0 VC\C. r \,1\ \/\1\a‘\ S' cc‘e Q..) cs.VC`3c:c‘°n� November 6, 1981 ,_0 City of Vail Mr. Peter Jamar 75 South Frontage Road ---------,, Vail , Colorado 81657 Re: Sundial Townhome Dear Mr. Jamar: Reference is made to the above project, to our current temporary occupancy, and the deficiency of some top soil , including, the hydro seeding of that area. We request an extension of the temporary occupancy to a time next spring that is feasible for us to complete this work. As you know we had already done this work, however, due to the heavy rains this fall it was washed out. We confirm to you that we will accomplish this as soon as the area is in condition that we can complete this work in the spring. Sincerely, PENNER CONSTRUCTION MANAGEMENT, INC. -- _7_ / 7T Paul H. Penner President PHP/dvc ' 'P 1795 WEST WARREN AVENUE • ENGLEWOOD, COLORADO 80110 • 303/935-3591 OR 934-2251 w Infer-Mountain Engineering Ltd. August 26, 1980 Mr. Ron Hodges Penner Construction Management, Inc. 1795 W. Warren Avenue Englewood, Colorado 80110 Re: Backfill Material Sundial Condominiums ._ l Vail, Colorado Project No. V-0020E Dear Mr. Hodges: As requested, an on-site inspection was made August 13, 1980, of work completed on backfilling at the subject project. Based on this inspection, the backfill work completed was found to be in accordance with our letter to you dated July 25, 1980, concerning recommendations for backfill. The backfill material was found to be capable of transfering the bearing loads to the river bedrock, and also will permit free-flow drainage. If you have any questions, please call. Sincerely, INTER-MOUNTAIN ENGINEERING, LTD. eThomas Allen Field Engineer GTA:cjn BOX NO. C-100 1420 VANCE STREET AVON, CO 81620 LAKEWOOD, CO 80215 949-5072 DENVER 893-1531 Phone: 232-0158 PENNER-FRANTZ & CO. 1795 West Warren Avenue Englewood, Colorado 80110 Telephone (303) 935-3591 July 29, 1981 Mr. Bill Andrews, Engineer Town of Vail Box 100 Vail , Colorado 81657 Dear Mr. Andrews, I was in your office on July 16th and spoke with you regarding the short stretch of city road between the Sundial Townhome project and the existing paved read You and I agreed that B & B Paving should pave that road at the time they paved our project. It is my understanding that a slight problem arose as a result of a potential culvert that needs to be put in that short stretch of read. We would appreciate having this done as soon as possible so that we can complete the selling and closings on our project. Thank you very much for your cooperation and attention to this matter. Very truly yours, PENNER-FRANTZ & CO. Norman D. Frantz Partner NDF/dvc 7/9/f/ HYDRO-TRIAD, LTD. July 7, 1981 Mr. Paul Penner Penner Construction Management, Inc. 1795 West Warren Avenue Englewood, Colorado 80110 Dear Mr. Penner: We have completed the hydraulic analysis on the Gore Creek reach adjacent to the Sundial Development project located in Vail . The anal- ysis was based on topographic sections provided by Inter-Mountain Engineering, Ltd. and shows the current as-built conditions. The water surface profile generated from these sections is generally in agreement with the one for previous conditions described in our report dated October, 1979. Two locations, Station 62.6 and Station 62.8, now show increases exceeding one foot. We feel that this difference is due to the different sources used to obtain creek cross- sections rather than a physical change of the creek. The survey data show the creek invert to be higher than that used in both our 1979 analysis and in the Gore Creek Floodplain Study dated 1975. These differences, ranging up to 18 inches, are probably a func- tion of the data sources used. All of the earlier work was based on elevations determined from topographic mapping and subject to interpretation. The present data were obtained by an actual field survey. Selection of the survey points could have seriously affected the creek cross-sections. Also, the centerline creek invert was not determined. A more detailed survey of the creek bed would probably show a lower invert, which would result in a lower water surface profile. Based upon our analysis, we feel that the present work correlates well with our previous study. We do not feel that the present grading of the Sundial development site has had a significant impact on the Gore Creek Floodplain. 12687 WEST CEDAR DRIVE-SUITE 100 LAKEWOOD, COLORADO 80228 PHONE 303-989-1264 Mr. Paul Penner Penner Construction Management, Inc. July 7, 1981 Page Two We wish to note that the creek bank opposite the project site shows signs of existing erosion. Degradation of this bank will continue during periods of high flow, such as spring runoff, independent of the Sundial project, unless measures are taken to stabilize it. We also noted during our field inspection that some of the riprap was lying in the creek. This should be removed. Our October, 1979 report specified 12-inch to 18-inch riprap be used. The riprap that was placed was of a nominal size, much larger than that. Although this is not a major problem, the smaller riprap will provide a more uniform blanket. Any voids along the bank, between the larger pieces of riprap, probably should be filled with a smaller piece of riprap to provide more uniform coverage and prevent erosion. If you have any additional questions, please feel free to contact us. " re. MAy ‘,v Sincerely,ti el/44,®�STeThz ed4.1:- . HYDRO-TRIAD, LTD.5"i ',.01 16081 1'1" O a' ,,,,e4 1 Kurt D. Mahnken P.E. .sa ° ?-:1 Z�tJ f°s• NAd ° �}� N.,4/./......0,4\--,/ Colorado Registration #16081 t, EOFCOI- tp MEMORANDUM TO: PLANNING AND ENVIRONMENTAL COMMISSION FROM: DEPARTMENT OF COMMUNITY DEVELOPMENT/PETER PATTEN DATE: June 17, 1981 RE: Request for a side setback variance for Sundial Townhouses, an un- platted parcel in Bighorn, for Penner Construction Management, Inc. • DESCRIPTION OF VARIANCE REQUESTED The request is for a variance of 4' , resulting in an 11 ' side setback on the northern property line. The building is in place, and the variance is requested due to a surveying error. The error is due to the destruction and subsequent re-location of a concrete monument during the construction of the adjacent project, Vail East Townhomes. The Staff has had meetings with the surveyors, along with the assistance of Dan Corcoran (acting as a neutral, expert third party) concerning how the error came about and whether or not the variance is justified. C UTL.,T' ANL' 7INDINGS Upon review of Criteria and Findings, Section 18.62.060 of the Municipal Code, the Department of Community Development recommends approval cf the requested variance based upon the following factors: Consideration of Factors The relationship of the requested variance to other existing or potential uses and structures in the vicinity. Directly to the north of the building which encroaches is a series of 4 proposed buildings within the Vail East Townhomes project. These buildings are proposed to be located a minimum of 20' from the common property line. We feel this 31 ' separation is sufficient for the distances between these buildings. The degree to which relief from the strict or literal interpretation and enforcement of a pecified regulation is necessary to achieve compatibility and uniformity of treatment among sites in the vicinity or to attain. the objectives of this title without grant of special privilege. From the information the Staff has been able to gather from Intermountain Engineering and Eagle Valley Engineering and Surveying, the surveying error seems to be an honest mistake and out of the control of the applicant. En- closed are letters from Intermountain and Eagle Valley regarding the error. Sundial -2- June 1981 The Staff feels that because all the evidence supports this being an innocent mistake and the applicant does not seem to be at fault, that the granting of the variance is not a special privilege, The effect of the requested variance on light and air, distribution of population, transportation and traffic facilities, public facilities and utilities, and public safety. There are no effects on these factors. Such other factors and criteria as the commission deems applicable to the 112 posed variance. FINDINGS: The Planning and Environmental Commission shall make the following findings before granting a variance: That the granting of the variance will not constitute a grant of special privilege inconsistent with the limitations on other properties classified in the same district. That the granting of the variance will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improve- ments in the vicinity. That the variance is warranted for one or more of the following reasons: There are exceptions or extraordinary circumstances or conditions applicable to the site of the variance that do not apply generally to other properties in the same zone. RECOMIMENDATION The Department of Community Development recommends approval of this variance request. Its evident surveying errors are not uncommon because of the circumstances in this area of East Vail. The resulting 11 ' setback does not negatively affect the adjacent development. • • ;, l 4 \[ 1 J • 1 ar+ 1 ,r E •-t ¢ [�:, e r j raa b v E t .J '� . l_,�Y :4' .d Cc_� p xv w I' 7 _,✓ . F )'.�44 , ['JO./ 1 I ) \//=', CCLO /'\DO L1(7);57 /176.41 • June 22, 1981 Mr. Peter Pattan Town of Vail. 75 S. Frontage Road W. Vail, CO 81657 RE: Sundial Phase II Dear Peter: Per your request, I sat in on the meeting with Mr. Jeff Spanel of Inter-Mountain Engineering and yourself to review the survey discrepancy on the above project. We have worked on a project in that immediate vicinity that caused us to tie into the section corner in question. Our field work indicated that other existing property corners in the Bighorn Subdivision, Fifth Addition do not relaLe correctly to the existing section corner, while they do relate well with each other. 1 would also state that I do not disagree with the proceaures used in replacing the section corner, proper procedures were followed. I feel that the platting and surveying errors in the Bighorn area could produce the problem on the above project. . Yours truly, EAGLE VALLEY ENGINEERING & SURVEYING, INC. -Dan Corcoran, L.S.. President • .DC/jw • PLAN' 1NC AND ENVIRRONMENTAL, COMMISSION i.. . ay, July 13, 1981 3:01) p.m. 1. Approval of minutes of June 2.2, 1981. 2. A request for a setback variance to make legal an existing building which . encroaches 4' into the side setback on 5010 Main Gore Drive which is part of an unplatted parcel in Bighorn, titled Sundial , Phase 1]:. Applicant : Penner Construction Management, Inc. 3. Appeal of administrative decision concerning the color of a residence on Lot 20, Potato Patch. Applicant: Jonine and J .J. Collins. 4. Request to table density variance application for lot 12, Block A7, Casolar Vail II at 1101 Vail View Drive. Applicants: Jean and James W. McDonald, Jean Catoe, et al. 5. A request for amendment in accordance with Sections 18.66. 110 through 18.66. 160 to the zoning ordinance from Residential Cluster to Residential Primary/Secondary in order to build a residential unit together with a caretaker's unit. Applicant: Doyle Hopkins. 6. A minor subdivision request to vacate a lot line between lots A-1 and A-2, Lionsridge Filing /fl . Applicant: AAV Limited Partnership. 7. A request for an exterior alteration and modification in Commercial Core II, under Section 18. 26.045 on lot 4, Block 1 , Vail Lionshead 1st Filing, to add 3,950 square feet of office space to the Lionshead Gondola Building, and a request for a variance to Section 18. 26. 150 to waive the requirement of i::e_::a'i::g en: half the parking within the main building. Applicant : Vail Associates. 8. A request for an exterior alteration and modification in Commercial Core I under Section 18. 24.065 on Tracts A, B, C, Block 5C, Vail Village 1st Filing, 174 East Gore Creek Drive, the Lodge at Vail. , in order to add a 618 square foot restaurant addition and a retractable glass enclosure over the existing swimming pool . Applicant : Lodge Properties, Inc. 9.. A request for approval to replat Highland licadows, lots 26-42, the Highland Park Special Development District 11, The approval is requested to allow new road dedications and vacations and lot line removals. This is a major sub- division requested under Chapter 17.04 of the Vail Municipal Code. Applicant: Su,i Tech Duiidels, Inc. 10. A request for a variance to Section 18. 14.090 of the Vail Municipal Code to allow the applicant to include flood plain area in calculating allowable density in determining the number of units allowed on the site of the Intermountain Swim and Tennis Club, an u1platted parcel in Vail Litermountain Subdivision. The applicants arc the Intermountain Swim and Tennis Club who wish to construct 2 additional units over the previous approval by Eagle County. 11. A request under Ordinance 13, Series of 1981 , for The Valley, Phase 6 for major. revisions to an approved site plan. The proposal is to rc-design the building; locations and unit designs, along with a portion of the road layout. Murray Properties Partnership of Dallas. Published in the Vail Trail July 10, 1981 gig 4 U I VII box 100 department of community development vail, colorado 81657 (303) 476-5613 July 21, 1981 Robert L. Pollard Project Manager Penner Construction Mangement, Inc. 1795 West Warren Avenue Englewood, Co. 80110 Re: Sundial Dear Bob, This letter will serve as certification that the Sundial project has complied with the Community Development Department's request to confirm that the modification which took place to the Gore Creek 100 year flood plain are built as per the original report from Hydro-Triad dated October of 1979. The July 7, 1981 letter from Hydro-Triad by Kurt Mahnken confirms that the "water surface profile generated from these sections is generally in agreement with the one for previous conditions described in our report dated October 1979". The report of July 7 also states that Hydro-Triad feels "that the present work correlates well with our previous study". The two requirements of the recent study were that smaller rip-rap be installed as per the original report and that the boulders deposited in the creek bed by the rip-rap installation be removed. I have 2 series of photographs, dated 7/11/81 and 7/17/81, respectively, which show that these 2 items have been complied with. Also, I have done on-site inspections verifying this. Thus, the Planning Staff is willing to release the hold on the Temporary Certificate of Occupancies that we've had for several weeks due to the floodplain question. It's my understanding that several Temporary C of 0's have already been issued at this point as per my verbal approval last Friday, July 17, 1981. Thank you for your cooperation in this matter. Mr, Broderick has been most cooperative and prompt in working with me. Please contact me if you have questions or comments about the project. Sincerely, A, PETER PATTEN JR. Senior Planner cc: Chuck Broderick, Steve Patterson lVu , y, ,lily 13, lPdl 3:00 p.m. 1 . Approval of iu1!IIt05 of June 22, 2. A request for a fietbnck variance to make I <•.,,:1l an existing boildi.ng. which encroaches 4' into the side setback on 5010 Mn Gore Drive which is part of an unplat.ted parcel in Bighorn, titled Sundial , Phase 11 . Applicant : Penner Construction Management, inc. f 3. Appeal of administrative decision concerning, the color of a residence on Lot 20, Potato Patch. Applicant : Joninc and J .J . Collins. 4. Request to table density variance application for lot 12, Block A7, Casolar Vail I1 at 1101 Vail View Drive. Applicants: Jean and James W. McDonald, Jean Ca toe, et al. . 5. A request for amendment in accordance with Sections 18.66. 110 through 18.66 , 160 to the zoning ordinance from Residential Cluster to Residential] Primary/Secondary in order to build a residential unit together with a car.etaker's 'unit. Applicant. Doyle Hopkins . • 6. A minor subdivision request to vacate a lot line between lots A-1 and A-2, Lionsridge Filing Jil . Applicant: AAV Limited Partnership. 7. A request for an exterior alteration and modification in Commercial Core I.T., under Section 18.26. 045 on lot 4, Block 1 , Vail Lionshcad 1st Filing, to add 3,950 square feet of office space to the Lionshead Gondola Building, and a request for a variance to Section 18.26. 150 to ;.!::,ive the requirement. _r =-- -'••-"--c' nn-. half the parking within the main building. -Applicant: Vail Associates. • 8. A request for an exterior alteration and modification in Commercial Core I under Section 18. 24.065 on Tracts A, B, C, Block SC, Vail Village 1st Filing, 174 East Gore Creek Drive, the Lodge at Vail , in order to add a 618 square foot restaurant addition and a retractable glass enclosure over the existing swimming pool . Applicant : Lodge Properties, Inc. 9., A request for approval to replat Highland Ileadows, lots 26-42, the Highland Park Special Development District 11. The approval is requested to allow new • road dedications and vacations and lot line removals. This is a major sub- division requested' under Chapter 17.04 of the Vail Municipal Code. Applicant : Jun Tech huiiders, Inc. 10. A request for a variance to Section 18. 14 .090 of the Vail Municipal Code to allow the applicant to include flood plain arca in calculating allowable density in determining the number of units allowed on the site of the intermountain Swim and Tennis Club, an uiplatted parcel in Vail Intermountain Subdivision. The applicants are the Intermountain Swim and Tennis Club who wish to construct 2 additional units over the previous approval by Eagle County. 11 . A request under Ordinance 13, Series of 1951 , for The Valley, Phase 6 for major revisions to an approved site plan. The proposal is to rc-design the building lor:1t 10115 and unit designs, ;116111; with i1 portion of the road layout . Murray Properties Partners i]a of Dallas, Published in the Vail Trail July 10, 1981 EAGLE VALLEY -1 I NEYING, INC. P.O. 50X 1813 VAIL. COLORADO e'1c57 303°476.4873 June 22, 1981 Mr. Peter Pattan Town of Vail 75 S. Frontage Road W. Vail, CO 81657 RE: Sundial Phase II Dear Peter: Per your request, I sat in on the meeting with Mr. Jeff Spanel of Inter-Mountain Engineering and yourself to review the survey discrepancy on the above project. We have worked on a project in that immediate vicinity that caused us to tie into the section corner in question. Our field work indicated that other existing property corners in the Bighorn Subdivision, Fifth Addition do not relate correctly to the existing section corner, while they do relate well with each other. I would also state that I do not disagree with the procedures used in replacing the section corner, proper procedures were followed. I feel that the platting and surveying errors in the Bighorn area could produce the problem on the above project. Yours truly, EAGLE VALLEY ENGINEERING & SURVEYING, INC. Dan Corcoran, L.S. President DC/jw PLANNING AND ENVIRONMENTAL COMMISSION June 22, 1981 2:00 p.m. Study session, Valley Phase 6 3:00 p.m. 1. Approval of minutes of June 8, 1981. 2. Request to table density variance application for lot 12, Block A7, Casolar Vail II at 1101 Vail View Drive. Applicants: Jean and James W. McDonald, Jean Catoe, et al. This request is to table to July 13, 1981. 3. Appeal of administrative decision concerning the color of a residence on Lot 20, Potato Patch. Applicant: Janine and J.J. Collins. 4. A request for a setback variance to make legal an existing building which encroaches 4' into the side setback on 5040 Main Gore Drive which is part of an unpiatted parcel in Bighorn, titled Sundial, Phase II. Applicant: Penner Construction Management, Inc. 5. A request for amendment in accordance with Sections 18.66.110 through 18.66.160 to the zoning ordinance for lot G-1, Lions Ridge Filing 2 to change the zoning from Residential Cluster to Residential Primary/Secondary in order to build a residential unit together with a caretaker's unit.. Applicant: Doyle Hopkins. Published in the Vail Trail June 19, 1981 . MEMORANDUM TO: PLANNING AND ENVIRONMENTAL COMMISSION FROM: DEPARTMENT OF COMMUNITY DEVELOPMENT/PETER PATTEN DATE: June 17, 1981 RE: Request for a side setback variance for Sundial Townhouses, an un- platted parcel in Bighorn, for Penner Construction Management, Inc. DESCRIPTION OF VARIANCE REQUESTED The request is for a variance of 4' , resulting in an 11' side setback on the northern property line. The building is in place, and the variance is requested due to a surveying error. The error is due to the destruction and subsequent re-location of a concrete monument during the construction of the adjacent project, Vail East Townhomes. The Staff has had meetings with the surveyors, along with the assistance of Dan Corcoran (acting as a neutral, expert third party) concerning how the error came about and whether or not the variance is justified. . CRITERIA AND FINDINGS Upon review of Criteria and Findings, Section 18.62.060 of the Municipal Code, the Department of Community Development recommends approval of the requested variance based upon the following factors: Consideration of Factors The relationship of the requested variance to other existing or potential uses and structures in the vicinity. Directly to the north of the building which encroaches is a series of 4 proposed buildings within the Vail East Townhomes project. These buildings are proposed to be located a minimum of 20' from the common property line. We feel this 31 ' separation is sufficient for the distances between these buildings. The degree to which relief from the strict or literal interpretation and enforcement of a specified regulation is necessary to achieve compatibility and uniformity of treatment among sites in the vicinity or to attain the objectives of this title without grant of special privilege. From the information the Staff has been able to gather from Intermountain Engineering and Eagle Valley Engineering and Surveying, the surveying error seems to be an honest mistake and out of the control of the applicant. En- closed are letters from Intermountain and Eagle Valley regarding the error. Sundial -2- Jung 1981 The Staff feels that because all the evidence supports this being an innocent mistake and the applicant does not seem to be at fault, that the granting of the variance is not a special privilege, The effect of the requested variance on light and air, distribution of population, tr2hsportation and traffic facilities, public facilities and utilities, and public safety. There are no effects on these factors. Such other factors and criteria as the commission deems applicable to the roosed variance. FINDINGS: The Planning and Environmental Commission shall make the following findings before granting a variance: That the granting of the variance will not constitute a grant of special privilege inconsistent with the limitations on other properties classified in the same district. That the granting of the variance will not be detrimental to the public health, safety, or welfare, or materially injurious to properties or improve- ments in the vicinity. That the variance is warranted for one or more of the following reasons: There are exceptions or extraordinary circumstances or conditions applicable to the site of the variance that do not apply generally to other properties in the same zone. RECOMMENDATION The Department of Community Development recommends approval of this variance request. It's evident surveying errors are not uncommon because of the circumstances in this area of East Vail. The resulting 11 ' setback does not negatively affect the adjacent development. ..ter►��'1 f III box 100 department of community development vail, colorado 81657 (303) 476-5613 June 25, 1981 Robert L, Pollard Project Manager Penner Construction Management, Inc. Englewood, Colorado 80110 Re: Sundial Dear Mr. Pollard: After review of your proposal to substitute hose bibbs for an automatic sprinkler system as originally proposed for the Sundial Townhome project by myself and a member of the Design Review Board who is a landscape architect, I have decided that it would be best to stay with the original propc ;al. In terms of efficiency and maintenance, the advantages of a sprinkler system far outweigh the proposed substitution. This has been solely my decision, and you do have the opportunity to appear before the full Design Review Board at one of their meetings to request the change. If you have any questions, please contact me. Sincerel , PETER JAMAR Town Planner PJ:br 0 s ;Fs tis%ecce■I 14\a G June 16, 1981 9t0,006\° ‘ �‘5 Town of Vail Planning Commission 75 S. Frontage Rd. Vail , Colorado 81657 Attn: Peter Patten Re: Sundial Townhomes Dear Peter: Per our discussion last week, I am enclosing a drawing showing the location of proposed hose bibbs on the Sundial Townhome project. I am requesting that these bibbs be considered in lieu of an automatic sprinkler system as originally proposed. We have learned, from past experience, the sprinkler system is a very high maintenance item. It is not worth the trouble it takes to keep it operating. In addition, a system in the climate such as the Vail area would be subject to repeated freezing from unexpected temperature drops and, for a good part of the season, would not be usable. In these instances, no water would be available. Your consideration of this proposal would be greatly appreciated. If I can answer any questions or be of any further service, please contact me immediately. Very truly yours, PENNER CONS ?ZION MAO. ENT, INC. Robert L. Pol l a d/ Project M. ager 4 1 1 rf RLP:bd 1. Enclosure I tit_- ,fJ 1795 WEST WARREN AVENUE • ENGLEWOOD, COLORADO 80110 • 303/935-3591 OR 934-2251 Inter-Mountain Engineering Ltd. June 16, 1981 Mr. Peter Patten Town of Vail Re: Variance Request Sundial Townhomes Dear Peter: This letter will summarize what we discussed at our recent meeting concerning the placement of the buildings at the Sundial project. Our survey crews had been using a concrete monument marked as a section corner along Sundial's northerly property line as the major point of control for the layout of the buildings. This concrete monument is referenced in the deed and is also called for as being in place on the plat of Bighorn Subdivision Fifth Addition. During the construction, demolition, and subsequent reconstruction of the Vail East Townhomes, this monument was destroyed. The county surveyor subsequently replaced this section corner; however, the location has changed. Unfortunately, due to the nature of construction staking, all of our control was for construction purposes and therefore has been destroyed or disturbed during the course of construction at Sundial. If you have any further questions, please contact me. Sincerely, Je fv' y J. Spanel, PE Vi e' Pre,.ident JMS:cjn BOX C-100 1420 VANCE STREET AVON,CO 81620 LAKEWOOD,CO 80215 949-5072;DENVER 893-1531 232-0158 V-- PUBLIC NOTICE NOTICE IS HEREBY GIVEN that the Planning and Environmental Commission of the Town of Vail will hold a public hearing in accordance with Section 18.66.060 of the Zoning Code of the Town of Vail on June 22, 1981 at 3:00 . p.m. at the Town of Vail Council Chambers in the Vail Municipal Building. Public Hearing and consideration of: 1. A request for amendment in accordance with Sections 18 66.110 through 18.66.160, to the zoning ordinance for lot G-1, Lions Ridge Filing #2 to change the zoning from Residential. Cluster to Residential Primary/ Secondary in order to build a residential unit together with a caretaker's unit. Applicant: Doyle Hopkins. 2. A request for a.set-back variance to make legal an existing building which encroached 4' into the side setback on. 5040 Main Gore Drive which is part of an unplatted parcel in Bighorn, titled Sundial, Phase II. Applicant: Penner Construction Management, Inc. The application and information relating to the proposed changes are available in the Zoning Administrator's office during regular business hours for review or inspection by the public. TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT Peter Patten, Zoning Administrator Published in the Vail Trail June 5, 1981. tiw H nt [ICH .., T ,, ,.., box 100 department of community deveiapment vail, color-ado 81657 (303) 476-5613 . March 27, 1981 Mr. Bob Pollard Penner Construction Management Inc. 1795 West Warren Avenue Englewood, Co 80110 Dear Mr, Pollard: Thank you for coming to our off;'ce ye terday to discuss the 100 year flood plain report for th: Sundia development. The director of Public Works has reviewed the -lycro-Triad report dated October 22, . 1979 for Sundial and agrees with the conclusions. His .only question was regarding the bank that has been constructed. Hydro-Triad needs to verify that the 100 year flood plain with revised grades as noted in figure III was actually installed in the field„ If not, they would need to specify what modifications are needed to the banks along Gore Creek. Sincerely, ,._ --.-- 1,"- '-1: _---- .r i DICK RYAN ( � Community Development Director DR:bpr Project Application µif Date f Project Name: '( j 6 j L I 0 3 — f.J tg t §1 110, f„ Project Description: Address and Phone: 0-3 P°j f'I Pe12'2_ P Architect Address and Phone: Legal Description: Lot , Block , Filing Zone: Zoning Approved: DO & Design Review Board Date 3/2, 7 Motion by: Seconded by: APPROVAL DISAPPROVAL Summary: 4 j dy/tf si6e4 Way. romi , 8 . - � " -4.-- O Zoning Administrator Chief Building Official Date: ' ' Date: r .. the printery.wae PENNER-FRANTZ & CO. 1795 West Warren Avenue Englewood, Colorado 80110 • Telephone (303) 935-3591 March 20, 1981 Town of Vail Building Department Vail , Colorado Re: Sundial Townhomes 5040 Main Gore Drive Gentlemen: Reference our Unit A-1 at Sundial , we would like to use this unit as our sales office and show model . Utilization of Unit A-i for this purpose should cover approximately a six month time frame. Very truly yours, PENNER-FRANTZ & CO. Norman D. Frantz Partner NDF:sp Project Application / Date ? 2/f' Project Name: Project Description 11.1 de s I':x'}16°12 '- w mer-Address and Phone: /r I/4' .- Ai 5: ✓. -0% d i"1. ,ki iqi7/7 x'41 . e/1/9/, /#1 . `3..0f Architect Address and Phone: Legal Description: Lot > , �I V Zone: Zoning Approved: Design Review Board Date Motion by: Seconded by: APPROVAL DISAPPROVAL Summary: %lie L./ . /„. kW";6-11 7Ph(/#1'-'- Zoniryg Administra Chief Building Official Date: Date: the printary/va,I U0U��0U 0~~~ ..~' ~ - uux 100 department of community development va|' rw|nmdo 81667 C303 476-5813 DeCeNbor 26, 1979 Candace Joehning Landmark Properties, Inc. 3033 South Parker Road Market Towers 1 Suite 604 Denver, CO 80231 Re: Sundial Development 100 l d Dear Candace: I have reviewed the Flo odplain Report submitted by Hydro Triad, Limited and have determined that the changes are of a minor enough nature that I can approve them at a staff level . ^ ' This does^ S that you will comply with erosion control measures on Page 5. If you have any further questions, please let me know. � . Sincerely, Pet-t"--40 A~ y2.J2-_ -_~ James A. Rubin Senior Planner Project Application Date Project Name: <�kl 1 I T Project Description: Owner Address and Phone: Architect Address and Phone: Legal Description: Lot , Block , Filing Zone: Zoning Approved: Design Review Board Dat : /7.7 Motion by: VO'V'G%(�,/1, Seconded by: '/V) iii APPROVAL DISAPPROVAL r 1/7/4"i* S u m m y: -/" 7i--/' I' G:f/. )°G�! /?6/1 Cyi° /7,- ;if / )/ � Zoning Administrator Chief Building Official Date: 1 Date: f the printery vail 0. ) i Project Application Date Co- f Project Name: !r. Project Description: <'r - c'3- Owner Address and Phone: Architect Address and Phone: f Legal Description: Lot , Block , Filing 71444 > ( ✓Lt r���yC Zone: Zoning Approved: /2e.;(.: '� .� fib<�✓ Design Review Board Date �� 1 Motion by: JeA 5O7 Seconded by: r// APPROVAL DISAPPROVAL i iP 560 )Wel c)611 /. Summary: ?re1 0/(.44f/t i.A., �1 �-2 ` l�/ �� c//d7 �f `" 4 / 6 i 1401 k X571 / t O� 14 ,; r 7 // Zonin g Administrator -7 Chief Building Official Date: T27-©� � Date: the printery,va 5cLLLg fpQy- / ( . — x 10. �� 1 t ..09 ---7., T X8 , , 0 A 2 7 S ,--- 6 n e — 1 - 610 ( 0.7 7 l 6 l 4 n a ) 'a.4! k," ii i cr q 7 f 3 4; ff.' f. ff Tr LANDMARK f PROPERTIES INC. May 4 , 1979 Mr. Jim Rubin 137 S . Frontage Road West Vail , Colorado 81657 Dear Mr . Rubin: Enclosed please find two copies of the plat for Sundial and one copy of the covenants . If any other information is needed please contact me at the office . Sincerely, (-2 Kandace Jae l ping ._` Director Sales and Marketing Landmark Properties , Inc . CJ/j la Encl . 14Y6 (-L-Q__ ji,6A_ 4.5 Ph ) . 0 - / D - 7 H • , 0 EXHIBIT I DECLARATION OF COVENANTS AND RESTRICTIONS FOR SUNDIAL TOWNHOMES THIS DECLARATION, made this day of April , 1979 , by LANDMARK PROPERTIES, INC. , hereinafter called Declarant; RECITALS WHEREAS, Declarant desires to provide for the preservation of the values and amenities in the Sundial Town- homes and, to this end, desires to subject the real property described in Article II to the covenants, restrictions , ease- . ments , charges and liens hereinafter set forth, each and all of which is and are for the benefit of said property and each owner thereof; and, WHEREAS , Declarant has deemed it desirable , for the efficient preservation of the values and amenities in Sundial Townhomes , to create an agency to which should be delegated and assigned the powers of maintaining and administering the community property and administering and enforcing the cove- nants and restrictions and collecting and disbursing the assessments and charges hereinafter created ; and , WHEREAS , Declarant has incorporated under the laws of the State of Colorado, as a non-profit corporation , the Sundial Townhomes Association, Inc. , for the purpose of exer- cising the functions aforesaid ; NOW, THEREFORE, the real property described in Article II , is and shall be held, transferred , sold, conveyed and occupied subject to the covenants , restrictions , easements , charges and liens (sometimes referred to as "covenants and restrictions" ) hereinafter set forth. ARTICLE I DEFINITIONS Section 1 . The following words when used in the Declaration or any Supplemental Declaration (unless the context thereof shall prohibit such use) shall have the following meanings : (a) "Association" shall mean and refer to the SUNDIAL TOWNHOMES ASSOCIATION , INC. (b) "The Lot" shall mean and refer to all exist- ing property subject to this Declaration, as set forth on the Townhome Map of the final Plat of Sundial Phase I , Exhibit A attached hereto. (c) "Single-Unit Parcels" shall mean and refer to those parcels described in Exhibit B attached hereto, and as indicated as Parcels 6 through 25 and 6A through 25A an Exhibit F attached hereto. (d) "Two-Unit Parcel Nos . 1 , 2 , 3 , 4 and 5" shall mean and refer to those parcels described in Exhibits A and C attached hereto, and as indicated as Parcels 1 through 5 on Exhibit F attached hereto. (e) "Common Property" shall mean and refer to that area of the Lot described in Exhibit D attached hereto and as indicated on Exhibit F attached hereto . (f) "Limited Common Property" shall mean and refer to that area of the Lot as set forth in Exhibits A and E attached hereto and as indicated on Exhibit F attached hereto. (g) "Access Easement" shall mean and refer to the Limited Common Property over which an easement exists for ingress and egress to the Single-Unit Parcels , as set forth in Exhibits A and E attached hereto and as indicated on Exhibit F attached hereto. (h) "Dwelling Unit" shall mean and refer to any room or group of rooms with kitchen facilities designed for or used by one family as an independent housekeeping unit. (i) "Family" shall mean and refer to an indi- vidual , or two or more persons related by blood, marriage, or adoption, excluding domestic servants, living together in a dwelling unit used as a single housekeeping unit; or a group of not more than four unrelated persons living together in a dwelling unit used as a single housekeeping unit. (j ) "Owner" shall mean and refer to the record owner, whether one or more persons or entities , of a fee simple title to any parcel situated upon the Lot but , not- withstanding any applicable theory of the mortgage, shall not mean or refer to the mortgagee, unless and until such mortgagee has acquired title pursuant to foreclosure or any proceeding in lieu of foreclosure. (k) "Member" shall mean and refer to all those Owners who are members of the Association as provided in Section IV. 2 . - 2 - (1) "Structure" shall mean and refer to anything constructed or erected with a fixed location on the ground, but not including poles , lines, cables , or other transmission or distribution facilities of public utilities, or mail boxes or light fixtures. (m) "Board of Directors" shall mean and refer to the Board of Directors of The Sundial Townhomes Associa- tion, Inc. (n) "Maps" shall mean and refer to the map or maps, as supplemented and amended, filed for record with the Clerk and Recorder of Eagle County, Colorado , to describe the project. The maps shall depict the project and its com- ponent parts to clearly show at least the following: (1) boun- dary description of the project, (2) the location of all build- ings and other improvements to be constructed thereon, (3) par- cels by number, (4) Common Property, and (5) Limited Common Property. (o) "Gross Residential Floor Area" shall mean and refer to the total floor area within the enclosing walls of dwelling units, including closets, service areas, and interior walls within the units , but excluding balconies , hallways , corridors, stairwells, garages , and service areas outside the dwelling unit, and uninhabitable heating or mechanical equipment areas. ARTICLE II PROPERTY DESCRIPTION AND RESERVATION TO ENLARGE Section 1. Existing Lot. The real property which is, and shall be, held , transferred, sold, conveyed, and occupied subject to this Declaration is located in the County of Eagle , State of Colorado, and is more particularly described in Exhibit A attached hereto. Section 2 . Reservation to Enlarge and Supplement The Lot. Notwithstanding any other provisions of this De- claration to the contrary, Declarant hereby reserves the right to enlarge the Lot by locating other parcels on separate adjoining real property, such separate adjoining real property to be submitted to and to be made a part of the Lot, at the option of the Declarant, and such submission, when and if made, shall be expressed in and by a duly recorded addition to the Maps hereof filed for record, and by a supplement to this Declaration. Adjoining real property, as the term is used herein , shall mean a parcel or parcels having a common boundary with the Lot as shown on Exhibit A. 2 . 1 In form and substance , the Supplement - 3 - to this Declaration shall provide for location of additional parcels of a size and area substantially the same as similar parcels in the existing Lot, separated from each other by substantially the same intervals as the parcels on the existing Lot. Such Supplement shall provide for the creation of common property substantially the same as the provision creating Common Property on the existing Lot. 2 . 2 The provisions of this section shall be of no effect unless the Declarant, or other person having the power to convey, conveys all such additional common property to all the Owners of the original and additional Single-Unit Parcels. 2 . 3 All of the provisions in this Declaration shall be applicable to such additional parcels and additional common property. ARTICLE III TOWNHOME PARCEL DESCRIPTION Section 1. The Townhome Parcels. The real property described in Exhibit A ( "The Lot") , as supplemented , and the improvements thereon, are hereby divided into fee simple estates as follows : 1 . 1 Single-Unit Parcels. Single-Unit Parcels are as described in Exhibit B. Each such estate shall consist of one of the twenty ( 20) separately designated parcels, together with an undivided one-twentieth (1/20) interest in and to the Common Property appurtenant to the parcel as set forth in Ex- hibit D, together with the Access Easement across the Limited Common Property as set forth in Exhibit E. 1 . 2 Two-Unit Parcels . Two-Unit Parcel Nos . 1, 2 , 3 , 4 and 5 are as described in Exhibit C. Each such estate shall consist of one of the five (5) separately de- signated parcels together with a one-fifth (1/5) undivided interest in and to the Limited Common Property appurtenant to the parcel as set forth in Exhibit E. Section 2 . Use of the Parcels. The parcels are restricted to residential use as more fully set forth in Section VII. 5. Section 3 . Conveyance of the Parcels and Ownership of the Common Property and Limited Common Property . Every con- tract for the sale of a parcel written prior to the filing for record of the Maps or Declaration may legally describe a parcel by its identifying unit designation followed by the name "Sun- dial Townhomes" . The location of such parcel described in - 4 - Section 3. Voting Rights. The Association shall have three classes of voting membership : 3 . 1 Class A. Class A members shall be all Owners of Single-Unit Parcels. Subject to the provisions of Section IV. 3 . 3 , Class A members shall be entitled to one vote per parcel for each parcel in which they hold the interest required for membership by Section 2 . With respect to the Limited Common Property, such votes may only be exercised on matters directly relating to the repair or maintenance of the Limited Common Property. 3 . 2 Class B. Class B members shall be all Owners of Two-Unit Parcels. Subject to the provisions of Section IV. 3 . 3 , Class B members shall be entitled to four (4) votes per parcel for each Two-Unit Parcel in which they hold the interest required for membership by paragraph 2 . Such votes may be exercised with respect to all Association business except matters directly concerned with the Common Property. 3 . 3 Class C. The Class C member shall be the Declarant. The Class C member shall be entitled to all voting rights in the Association until May 1 , 1980 . Thereafter, the Class C member shall have such voting rights as are set forth in paragraphs IV. 3 . 1 and IV 3 . 2 . ARTICLE V BOARD OF DIRECTORS The initial Board of Directors of the Association shall consist of three members , and the names and addresses of the persons who are to serve as Directors until the first annual meeting of the Members or until their successors shall be elected and qualified are : Ronald L. McCaughan 6691 No. Hillside Way Parker, Colorado 80134 Thomas S. Heesch 6782 No. Hillpark Parker, Colorado 80134 Stephen A. Kohner 5035 N. 39th Ave. Phoenix, Arizona 85016 The Board shall have the powers and duties as set forth in the Articles and By-Laws of the Association. - 6 - Exhibits B and C , as supplemented, on the Property described in Exhibit A, as supplemented, shall be depicted on the Maps subsequently filed for reocrd. 3 . 1 Every contract , deed, lease, deed of trust, mortgage, will , or other instrument may legally describe a parcel by its identifying unit designation followed by "Sundial Townhomes , according to the filed and recorded Maps and Declaration" . Every such description shall be good and suffi- cient for all purposes to sell , convey, transfer, encumber, or otherwise affect not only the parcel but also the Common Property and Limited Common Property that may be appurtenant thereto. 3 . 2 The reference to the Maps or Declaration in any instrument shall be deemed to include any supplements or amendments to the Maps or Declaration without specific reference thereto. 3. 3 Each Owner of a Single-Unit Parcel shall own the undivided appurtenant fee simple interest in and to any new additions of Common Property. 3 . 4 The Common Property shall be owned in com- mon by the Owners of the Single-Unit Parcels and shall remain undivided. The Limited Common Property shall be owned in common by the Owners of the Two-Unit Parcels and shall remain undivided. No Owner shall bring any action for partition or division of the Common Property or Limited Common Property. ARTICLE IV THE ASSOCIATION Section 1. The Association. The Sundial Townhomes Association, Inc. , is a Colorado non-profit corporation es- tablished to preserve the values and amenities of the real property subject to this Declaration. The Association shall have the power and authority to maintain the Common Property and the Limited Common Property and to administer and enforce the within covenants and restrictions and to collect and dis- burse the assessments levied by the Association , all as more fully set forth in the Articles of Incorporation and the By- Laws of the Association. Section 2 . Membership. Every person or entity who is a record owner of a fee interest in any parcel herein shall be a member of the Association, provided that any such person or entity who holds such interest merely as a security for the performance of an obligation, shall not be a member . - 5 - ARTICLE VI COVENANT FOR MAINTENANCE ASSESSMENTS Section 1. Personal Obligation for Assessments . The Declarant, for each parcel owned by the Declarant within the Lot, hereby covenants, and each Owner of any parcel by acceptance of a deed therefor (whether or not it shall be so expressed in any such deed or other conveyance) , covenants and agrees to pay to the Association an annual assessment or charge. Section 2 . Purpose of Assessments . The assessments levied by the Association shall be used exclusively for the purpose of promoting the recreation, health, safety, and welfare of the residents of the parcels and in particular, but not by way of limitation, for road , landscape or drainage maintenance, irrigation work, professional fees , and for any other object or purpose in keeping with the object and aim of these covenants and restrictions and contributing to the maintenance and preservation of these covenants and restrictions . Section 3 . Basis of Annual Assessments. Until the year beginning January 1980 , the monthly assessment shall be as indicated below for each parcel . Each Owner of a parcel shall be required to maintain a three-month reserve assessment contribution. Single-Unit Parcels : $ 50 . 00 per month Two-Unit Parcels : $ 50 . 00 per month 3 . 1 From and after January 1 , 1980 , the Board of Directors of the Association shall , after consideration of current maintenance costs and future needs of the Association, fix the monthly assessments based on actual need. The assess- ments for the Single-Unit Parcels shall be limited to the needs of the Common Property, and the maintenance and repairs of the Limited Common Property. The assessments for the Two- Unit Parcels shall be limited to the needs of the Limited Common Property. Written notice of each such monthly assess- ment shall be sent to each member and payment shall be due within ten days of the mailing of such notice. Each member ' s reserve shall be adjusted in accordance with the monthly assessment so determined. 3 . 2 From and after January 1 , 1981 , the Board of Directors of the Association shall , after considering current maintenance costs and future needs of the Association, fix - 7 - an annual assessment, based upon actual need , and , in making such determination shall give primary consideration to the preceding year' s actual expenditures. The limitations on assessment purposes contained in paragraph VI . 3 .1 shall apply to such annual assessments. Each member ' s reserve shall be adjusted in accordance with such determination. Such annual assessment shall not be changed thereafter unless change is made in compliance with Section VI . 4 . Section 4 . Change in Basis for Annual Assessment. From and after January 1 , 1981 , the Association may change the basis of the assessments fixed by Section VI . 3 , provided that any such change shall have the assent of sixty-seven percent (67%) of the vote of all members who are voting in person or by proxy, at a meeting duly called for the purpose . Written notice of such meeting shall be sent to all members at least thirty (30) days in advance of the meeting. Section 5 . Date of Commencement of Annual Assessments . The first annual assessment provided for herein shall commence on the 1st day of January, 1981 , and shall be payable in twelve equal monthly installments , the first such installment to be paid on the first day of January, 1981 , and subsequent installments to be paid on the first day of each month there- after . Annual assessments in subsequent years shall be deter- mined on or before December 1 of the preceding year, and shall be payable in monthly installments as aforementioned. Written notice of assessment shall thereupon be sent to every member. Section 6 . Unpaid Assessments ; Owner ' s Liability; Lien. 6 . 1 All sums assessed but unpaid for the share of common expenses chargeable to any parcel shall constitute a lien on such parcel superior to all other liens and encum- brances, except only for tax and special assessment liens on the parcel in favor of any governmental assessing entity, and all sums unpaid on a first mortgage or first deed of trust of record, including all unpaid obligatory sums as may be provided by such encumbrances. To evidence such lien, the Board of Directors or its designee shall prepare a written notice of lien assessment setting forth the amount of such unpaid indebtedness , the amount of the accrued interest and late charges thereon , the name of the Owner of the parcel and the legal description of the parcel. Such notice of lien shall be signed by one of the members of the Board of Directors or its designee or by one of the officers of the Association on behalf of the Asso- ciation and shall be recorded in the office of the Eagle County Clerk and Recorder. Such lien shall attach and be effective from the due date of the assessment until all assessment sums , with interest and other charges thereon, have been fully paid. - 8 - 6 . 2 Such lien may be enforced by the fore- closure of the defaulting Owner' s parcel by the Association in like manner as a mortgage on real property, upon the re- cording of a notice of claim of lien. In any such proceedings , the Owner shall be required to pay the costs , expenses , and attorney ' s fees incurred for filing the lien, and in the event of foreclosure proceedings , all additional costs , all expenses , and reasonable attorney' s fees incurred. The Owner of the parcel being foreclosed shall be required to pay to the Asso- ciation the monthly assessment for the parcel during the period of foreclosure, and the Association shall be entitled to a receiver during foreclosure. The Association shall have the power to bid on the parcel at foreclosure or other legal sale and to acquire and hold, lease , mortgage , vote the votes appurtenant to, convey, or otherwise deal with the same. 6 . 3 Any mortgagee holding a lien of record on a parcel may pay, but shall not be required to pay, any unpaid common expenses payable with respect to such parcel , and upon such payment, such encumbrancer shall have a lien on such parcel for the amount paid of the same rank as the lien of his mortgage or encumbrance without the necessity of having to record a notice or claim of such lien. Upon request of a mortgagee of a parcel the Association shall report to such mortgagee any default which has not been cured within 60 days; provided , however, that such mortgagee shall have furnished to the Bard of Directors notice of such mortgagee ' s encumbrance. 6 . 4 The recorded lien may be released by recording a Release of Lien signed by one of the members of the Board of Directors or its designee or by an officer of the Association. Section 7 . Exempt Property. The following property subject to this Declaration shall be exempted from the assess- ments , charge and lien created herein: (a) all properties to the extent of any easement or other interest therein dedicated and accepted by the local public authority and devoted to public use ; (b) all properties exempted from taxation by the laws of the State of Colorado , upon the terms and to the extent of such legal exemption. 7 . 1 Notwithstanding any provisions herein, no land or improvements devoted to dwelling use shall be exempt from said assessments , charges or liens . - 9 - ARTICLE VII LAND USE Section 1. Use Restrictions . The following res- trictions, covenants and easements are imposed uniformly upon the parcels and the use thereof as a common scheme for the benefit of each parcel and may be enforced by the Association or any parcel Owner. 1 .1 Land Use, Building Type and Occupancy. Single-Unit Parcels shall be used to construct a single residential dwelling unit for occupancy by a single family. Two-Unit Parcel Nos. 1 , 2 , 3 , 4 and 5 shall be used to construct two attached residential dwelling units with each to be occupied by a single family. Any dwelling unit con- structed on any parcel may have a gross residential floor area not exceeding one thousand eight hundred ten (1 , 810) square feet. No commercial or non-residential use of any parcel or portion thereof shall be permitted. 1 . 2 Subdivision. No further subdivision or resubdivision of any parcel or combination of parcels shall be permitted. 1 . 3 Municipal Restrictions . Structures erected upon any parcel shall conform to architectural restrictions imposed by the Municipal Code of Vail , Colo- rado. Additionally, Single-Unit structures erected upon the Lot shall comply with Sections 18 . 14 . 060 (setbacks) , 18 . 14 . 080 (height) , 18 . 14 . 110 (coverage) and 18 . 14 . 130 (landscaping and parking) , of the Municipal Code of Vail, Colorado. Structures erected upon Two-Unit Parcels shall comply with Sections 18 . 12 . 060 (setbacks) , 18 . 12 . 080 (height) , 18 . 12 . 110 (coverage) and 18 . 12 . 130 (landscaping and parking) , of the Municipal Code of Vail , Colorado . 1 . 4 Building Design. Only custom designed homes will be approved; standard builder models will not be allowed. The design should be done in an effort to pro- tect as much of the natural environment as possible , mini- mizing the removal of trees and the disturbance of the natural topography and native vegetation. Dwellings using natural materials will be encouraged . 1 . 5 Fences or Walls . Fences or walls are encouraged to enclose limited areas on the parcel where pri- vacy is desired. Fencing the entire parcel or long continuous fences on any parcel lines will not be allowed . All fences or walls will be consistent with and a visual extension of the architecture of the dwelling unit. Similar materials will be used and the scale will be appropriate . - 10 - 1 . 6 Removal of Trees . The removal of trees , shrubs and other landscaping must be approved by the Asso- ciation. The existing natural vegetation, trees and rock outcroppings that are to remain on each parcel must be maintained without charge. 1 . 7 Landscaping. Preservation of the natural landscaping will be encouraged , and only those areas which are disturbed or graded during the course of construction or which are enclosed by walls or fences may be replanted with landscaping not native to the area. Substitute mater- ials such as rock, gravel or paving must be approved by the Association and will generally be discouraged. Land- scaping shown on the approved plot plan must be completed within one (1) year after construction of the house has been completed. 1 . 8 Construction Restrictions and Materials Storage. No storage of materials will be allowed on any parcel except when enclosed or out of view of the adjoining parcel. During construction, material storage and equipment movement and grading will be allowed only in those areas where the structures will be built and those areas to be relandscaped or enclosed by fences or walls. Other areas of the parcel shall be fenced to prevent access by construction equipment prior to beginning any construction on the parcel . 1 . 9 Unsightly Objects. Refuge piles or other unsightly objects or materials shall not be allowed to be placed or to remain upon any premises , easements or any street unless placed in a suitable container. Garbage cans are to be behind decorative fencing or otherwise hidden from the view of the Common Property or Limited Com- mon Property. 1 . 10 Commercial Vehicles , Campers and Trailers. No commercial type vehicles and no trucks shall be stored or parked on any parcel nor parked on the Common Property or Limited Common Property except while engaged in transport to or from a dwelling. For the purposes of this restriction, a truck having a 3/4 ton manufacturer ' s rated capacity, commonly known as a pick-up truck, shall not be deemed to be a commercial vehicle or a truck. Campers and trailers shall be parked or stored out of sight of the Common Property and Limited Common Property and screened from the view of adjoining parcels. 1 . 11 Nuisances . No offensive activities shall be carried on upon any parcel nor shall anything be done thereupon which may or may become an annoyance or nuisance to the neighborhood. - 11 - 1 . 12 Animals . No person shall be allowed to keep, breed or raise chickens, turkeys, cattle, horses , sheep, goats, swine or any other domestic farm or barnyard animals or fowl on any parcel or erect thereupon any building designed to house the same. This restriction shall not be construed to prohibit any person from keeping dogs , cats or other household pets on any parcel , provided they are not kept, bred or raised for any commercial purpose. 1. 13 Temporary Residences. No structure of a temporary character, trailer, basement, tent, shack, barn or other outbuilding shall be used on any parcel at any time as a residence, either temporarily or permanently, and no used structure of any sort shall be moved onto any parcel. 1 . 14 Signs. No signs of any kind shall be displayed to the public view on any parcel except one pro- fessional sign by a builder, developer or subdivider to advertise the parcel during the construction, development and sales period. 1 . 15 Easements. Easements for the installa- tion and maintenance of utilities and drainage facilities are reserved as shown on the recorded Maps . Within these easements no structure, planting or other material shall be placed or permitted to remain, which may damage or interfere with the installation and maintenance of utilities ; or which may change the direction of flow of drainage channels in the easements ; or which may obstruct or retard the flow of water through drainage channels in the easements. The easement area of each parcel and all improvements on it shall be maintained continuously by the parcel Owner except for those improvements for which a public authority or utility company is responsible. 1 . 16 Outside Clotheslines , Aerials , Antennas , Carports , Patio Covers and Other Similar Structures . Outside aerials , clotheslines, antennas , carports , patio covers or similar structures shall not be permitted unless approved by the Association. 1 . 17 Unused Automobiles or Vehicles of Any Kind . All unused automobiles or vehicles of any kind , except as hereinabove provided, shall not be stored or parked on any parcel, except in a closed garage. Unused vehicles shall not be parked on the Common Property or the Limited Common Pro- perty. "Unused vehicle" shall be defined as any vehicle which has not been driven under its own propulsion for a period - 12 - of one (1) week or longer. A written notice describing the "unused vehicle" shall be personally served upon the owner and , if such vehicle has not been removed within seventy-two (72) hours thereafter , the Association shall have the right to remove the same and the expense thereof shall be charged against the owner. In the event the owner cannot be found , then notice in writing shall be posted on the "unused vehi- cle" itself , and if within ten (10) days thereafter such vehicle has not been removed, the Association shall have the right to remove the same and the expense thereof charged as above set forth. 1 . 18 Right of Entry. The Association officers o� other persons designated by the Association shall have the right to enter upon any parcel and in or upon any im- provement located on such parcel , for the purpose of in- specting any construction, alteration, remodeling conducted thereon, provided that such right of entry shall be exercised at reasonable hours of the day or night. 1 . 19 Common Property and Limited Common Pro- perty. Common Property shall be reserved for use by the Owners of Single-Unit Parcels . Limited Common Property shall be reserved for use by the Owners of Two-Unit Parcels , subject to the Access Easement described in Exhibit F and any other easement over the Limited Common Property for utilities or ingress and egress to property outside the Lot. No structures of any kind , other than relating to utilities , shall be erected on any portion of the Common Property or the Limited Common Property. 1 . 20 Water and Sewer. Water service for all parcels shall be provided by the Big Horn Water District and sewer service for all parcels shall be provided by the Upper Eagle Valley Sanitation District. No individual water well or sewage disposal system shall be permitted on any parcel. 1 . 21 Trash and Garbage. No trash , garbage , ashes or other refuse may be thrown or dumped on any portion of the Lot. The burning of refuse out of doors shall not be permitted . No incinerators or other device for the burning of refuse indoors shall be constructed , installed or used by any person. Each parcel Owner shall provide suitable receptacles for the collection of refuse and such receptacles shall be screened from public view. 1 . 22 Continuity of Construction. All struc- tures commenced shall be pursued diligently to completion and shall be completed within 12 months of commencement , unless a longer period of completion receives the written consent of the Association. - 13 - 1 . 23 Gas and Propane Tanks. All gas or propane tanks located on any parcel shall be buried underground or shielded in some other fashion as designated by the Asso- ciation. 1 . 24 Electric Service Drops . All power lines located on any parcel , including all service drops , shall be concealed from view by underground installation along their entire lengths . ARTICLE VIII MORTGAGEE ' S RIGHTS Section 1. Applicability. This article applies to any mortgagee under a first mortgage, or any beneficiary under a first deed of trust, which mortgage , or which deed of trust, affects any parcel. Section 2 . Notice of Default. Any first mortgagee or beneficiary, upon request, shall be entitled to written notification from the Association of any default in the per- formance by a parcel Owner of any obligation under this Declaration of Covenants and Restrictions , the Articles of Incorporation, By-Laws or rules and regulations of the Association which is not cured within sixty (60) days . Section 3 . Exemption From First Right of Refusal . Any first mortgagee or beneficiary who obtains title to a parcel pursuant to the remedies provided in the mortgage or deed of trust, or foreclosure thereof , or pursuant to a deed or assignment in lieu of foreclosure, shall be exempt from any "right of first refusal" contained in the By-Laws , or rules and regulations of the Association. Section 4 . Amendments . Unless at least sixty-seven percent (67%) of the first mortgagees or beneficiaries (based upon one vote for each first mortgage or each first deed of trust owned) , or sixty-seven percent (67%) affirmative vote of the Members of the Association, the Association shall not be entitled to : (a) change the method of determining the assessments which may be levied against parcel Owners ; - 14 - (b) by act or omission change , waive, or aban- (Ion any scheme of regulations or enforcement thereof, per- taining to the maintenance of the Common Property or Limited Common Property; (C) fail to maintain fire and extended cov- erage on insurable Common Property or Limited Common Property on a current replacement cost basis in an amount not less than one hundred percent (100%) of the insurable value (based on current replacement cost) ; (d) use hazard insurance proceeds for loss to any Common Property or Limited Common Property for other than the repairs , replacement or reconstruction of such Common Property or Limited Common Property. Section 5. Examination of Books . Any first mort- gagee or beneficiary shall have the right to examine the books and records of the Association. Section 6 . Curing Defaults . Any first mortgagee or beneficiary may, either jointly or singly, pay taxes or other charges which are in default and which may have become a charge against the Common Property or Limited Common Pro- perty and may pay overdue premiums on hazard insurance poli- cies , or secure new hazard insurance coverage in the event of the lapse of a policy and any such payment or payments so made shall be immediately reimbursed to such first mortgagee or beneficiary by the Association. Section 7 . Application of Proceeds . Any other provision of this Declaration to the contrary notwithstanding, any proceeds received by the Association in respect to the Common Property or Limited Common Property, either in the form of insurance proceeds, awards in condemnation, or other, which are distributed to the Owners of parcels shall be distributed to such parcel Owners subject to the lien or interest of any first mortgagee or beneficiary, as such lien or interest appears . Section 8 . Reserve. Association assessments shall include an adequate reserve fund for maintenance, repairs and replacement of those elements of the Common Property or Limited Common Property that must be replaced on a periodic basis. As- sessments in respect to such reserve shall be paid in regular installments rather than by special assessments. Section 9 . Termination of Management Agreement. If the Association enters into any agreement for professional management of the Common Property or Limited Common Property, or any contract which provides for services by the developer , - 15 - such agreement or contract shall expressly provide for ter- mination by either party, without cause, or payment of a ter- mination fee , on no more than ninety (90) days ' written notice . No such contract shall be for a term of more than three (3) years. ARTICLE IX GENERAL PROVISIONS Section 1. Duration. The covenants and restrictions of this Declaration shall run with and bind the land, and shall inure to the benefit of and be enforceable by the Declarant , the Association , or the Owner of any land subject to this Declaration, their respective legal representatives , heirs , successors , and assigns , and shall continue in full force and effect for a term of 21 years from the date of this Declaration' s recording, at which time said covenants shall be automatically extended for successive periods of ten (10) years each. Section 2 . Amendments. The conditions , restrictions , agreements and covenants contained herein shall not be waived, abandoned, terminated or amended except by written consent of the Owners of the privately owned land included within the boundaries of the Lot as follows : If the amendment proposed would affect or change the use or uses permitted within the Lot, or change or affect the obligations of the Owners in respect to assessments , or change or affect the members of the Association, then such amendment shall not become effective unless there occurs a sixty-seven percent ( 67%) affirmative vote therefore by the members of the Association. Section 3 . Municipal Approval . Any provision of the Declaration to the contrary notwithstanding , the Common Pro- perty or the Limited Common Property shall not be reduced in area, and the dwelling units shall not be increased in number , without the approval of the Town of Vail . Section 4 . Notice. Any notice required to be sent to any Member or Owner under the provisions of this Declaration shall be deemed to have been properly sent when mailed, post- paid , to the last known address of the person who appears as Member or Owner on the records of the Association at the time of such mailing. Section 5 . Enforcement. Enforcement of these covenants and restrictions shall be by any proceeding at law or in equity by the Association or any Owner against any person or persons violating or attempting to violate any covenant - 16 - or restriction, either to restrain violation or to recover damages , and against the land to enforce any lien created by these covenants, and failure by the Association or any Owner to enforce any covenant or restriction herein contained shall in no event be deemed a waiver of the right to do so thereafter. Section 6 . Severability. Invalidation of any one of these covenants or restrictions by judgment or court order shall in no wise affect any other provisions which shall remain in full force and effect. Section 7 . Declarant' s Reservation to Grant Ease- ments and to Record Easements on an Amended Plat. The De- clarant , in order to grant easements to the owners of every parcel in the subdivision for driveways , utilities and parking, hereby reserves the right to grant to every purchaser of parcels easements in and over the Common Property or Limited Common Property reasonably required for each such purchaser for such purposes , such reservation of such right to continue until the Declarant has sold every parcel , and for a reasonable time thereafter. Declarant also reserves the right unilaterally, without the consent of owners of parcels , to file or record amended Maps of the Lot. IN WITNESS WHEREOF, this instrument is executed by the Declarant this day of April , 1979 . ATTEST: LANDMARK PROPERTIES , INC . By President (Seal) - 17 - I MINUTES PLANNING & ENVIRONMENTAL COMMISSION MEETING OF April 10 , 1979 COMMISSION MEMBERS PRESENT : Ed Drager Jack Goehl Ron Todd Gerry White Sandy Mills Roger Tilkemeier Jim Morgan STAFF MEMBER: Jim Rubin The first item on the agenda : Ast/Kleimer Duplex Request for Variance , Lot 14 , Vail M^adows 1st Filing , was withdrawn by the applicant . The second item on the agenda : Fitzhugh Scott - Resub- division of Lots 10 & 11, Block 1 , Vail Village 1st Filing to correct a lot line . Jim Rubin presented this to the Commission , and after some discussion , the Motion was made by Ron Todd to approve the resubdivision of Lots 10 & 11 , Block 1 , Vail Village 1st Filing to correct the location of a lot line. Roger Tilkemeier seconded the Motion and the Commission voted unanimous approval . The third item on the agenda : Prelminary review of the First Phase of a Townhouse Project on 5 . 6 acre unplatted parcel in Bighori Mr . Steven Hannon, President: of Landmark Properties was present to address the Commission along with Ron McCaughan and their architect . Jim Rubin explained the First 'Phase is for 5 duplex parcels as part of a 30 unit Townhouse project which will be called Sundial . Mr . Rubin explained that the parcels will be sold separately as duplex home sites . Jim explained that he had discussed this concept with Larry Rider , Town Attorney and that the staff feels this is an advantageous way of handling the project as it will allow flexibility on the location of buildings . Townhouse declarations for this project were then discussed . These declarations provide legal access to the 5 parcels , as well as size restrictions . Jim Rubin requested that more specific restrictions in regard to Setbacks , Height , Site Coverage , Landscaping and Parking be included in these declarations . The site plan was presented to the Commission . After further discussion , the Motion was made by Gerry White to approve the first phase of the Sundial Townhouse project with the condition that the development restrictions of the Two-Family Residential Zone District in regard to Setbacks , Height , Site Coverage, Landscaping , and Parking Page 2 . MINUTES-PEC 4-10-79 be included in the Townhouse declarations for this First Phase . Ron Todd seconded the Motion and the Commission voted unanimous approval . The fourth item on the agenda : Re-Application for a Conditional Use Permit for the Schober Building in Commercial Core I . Craig Snowdon made his presentation to the Commission . This second proposal cuts out alot of the square footage that was presented with the first proposal . They now propose to add 1 ,859 sq . ft . , which is 1 , 100 sq . ft . less than the first proposal . He again told the Commission that they will be adding to all five levels of the building but will be reducing the northern extension considerably. He also discussed the Public /Private Joint Venture application with the Commission This application is for benches and planters along Gore Creek Dr . , and the Fountain Plaza with additional plantings on Town property by the Creekside stairs . The 4th level has been changed from what was proposed at the preliminary discussion . The owner now proposes to put in kitchenettes and loft bedrooms in the accommodation units and use these two units for employee housing . The shop owner and the owner of the restaurant have already expressed interest in leasing these units for their employees . Ron Todd asked whether the owner will commit these units under the same criteria as other employee housing units which will remain as long-term rentals for a 20-year period ? It was the Commission members feeling that these units should meet this criteria . The owner discussed this with the Commission and stated he had no problems with this commitment as long as he can come back and change the use of the units if the situation requires it . The owner was told that Larry Rider , Town Attorney, will draft the conditions for the employee housing, as a deed restriction, or something in this order . Ed Drager stated that Pepi Gramshammer had sent a letter to the Commission in opposition to the additions to buildings in the Core . Mr . Gramshammer was present and spoke to his concerns for building out in the Village . Mr . Drager explained to Mr . Gramshammer that the Planning & Environmental Commission in dealing with the Conditional Use Permit process , needs to review all the criteria set down in the Town of Vail Zoning Ordinance and that each project must stand on its own . He stated that the Schober Building had been turned down the first time it was presented . He assured Mr . Gramshammer that not all _expansions will be approved and each would have to be reviewed on its own merit . Any of the proposals that will be brought to the Planning Commission will have to show beneficial effects throughout , and the Commission will adhere to strict standards for any additional construction in the Village . However , he added , there has to be changes from time to time . Roger Tilkemeier stated that the Commission had been told by Larry Rider , that the Conditional Use Permits do not set precedent , and so they are not bound to approve all proposals for additions to the buildings in the Core . Page 3 MINUTES-PEC 4-10-79 Mr . Gramshammer was still very concerned about the effects of increased traffic , more delivery trucks and the trash problems . He stated these problems are very severe now. Ron Todd assured Mr . Gramshammer that the Planning & Environmental Commission has these very same concerns . The owner of the restaurant in the Schober Building, Herman Staufer , then spoke to the Commission . He also has the same concerns as Mr . Gramshammer , but he believes that the owner of the Schober Building has a very good attitude about his building, and is willing to enhance the appearance of his building . This can 't help but to improve the appearance of the Village as a whole. Gerry White then made the Motion to approve the Conditional Use Permit for the Schober Building in Commercial Core I as presented . Ron Todd seconded the Motion. Sandy Mills then made the comment that with the reduction in square footage, where it does not affect the view corridors , and fits in well with the existing structure ; she feels this second proposal does meet the criteria set forth in the Zoning Ordinance and that the PEC has examined it thoroughly . The Commission voted unanimous approval . The fifth item on the agenda : Creekside Building Request for a Conditional Use . Permit in Commercial Core I . The applicant has requested that this be postponed until the next regularly scheduled meeting of the Planning & Environmental Commission on April 24 , 1979 The sixth item on the agenda : Lionsridge Cl-05 Development Plan. The applicant has requested that this be postponed until the next regularly scheduled meeting of the Planning & Environmental Commission on April 24 , 1979 . The seventh item on the agenda : Discussion of a proposed deck for Manor Vail which would encroach on Town of Vail Stream Tract Land . Jim Rubin explained to the Commission that they need to discuss this and make their recommendations to the Town Council . A representative from Manor Vail was present to explain this proposal to the Commission . Jim Rubin explained to the Commission that the staff is concerned with any encroachment on public -ways . Sandy Mills stated she feels this encroachment should not be allowed . Ron Todd made the Motion to recommend to the Town Council disapproval of the proposed outside deck on Manor Vail that would encroach on Town of Vail Stream Tract land . The Motion seconded by Jack Goehl and the Commission voted unanimously to recommend disapproval of this proposal . Page '4 MINUTES-PEC 4-10-79 The eighth item on the agenda : Public/Private Joint Venture Funding Recommendations . These were discussed in full . These recommendations are in a separate report. Meeting adjourned 6 : 15 P .M. • \ ?,fin r reh ION o Yap , .. box 100 • vail,colorado 81657 department of community development D-J Lan & Cattle Co . 1517 8t Ave . Greeley Colo . 80631 • M E M O• TO: PLANNING AND ENVIRONMENTAL COMMISSION FROM: DEPARTMENT OF COMMUNITY DEVELOPMENT DATE : APRIL 6 , 1979 RE : STAFF RECOMMENDATIONS FOR PLANNING AND ENVIRONMENTAL COMMISSION MEETING ON APRIL 10 , 1979 1 . ) Ast/Kleimer Duplex-Application has been withdrawn . 2 . ) Fitzhugh Scott Resubdivision This resubdivision is to legally record a change in the lot line between Lots 10 and 11 that happened about five years ago . This change in the lot line makes Lot 11 more conforming than it presently is . Staff Recommendation : Approval 3 . ) McCaughan Townhouse Project This is the First Phase of the proposed 33 unit Sundial Project on a 5 . 6 unplatted parcel in Bighorn . The First Phase is the creation of four building envelopes similar to the Casolar- del-Norte Subdivision . The building envelopes are for duplex sites , and are different from the Casolar Subdivision in that they include both land for the buildings and areas around. the buildings . We feel that this is a better concept than the smaller , more defined building envelopes in that there is more flexibility for the placement of buildings . It is , however , a Townhouse concept , with these four sites a part of the overall townhouse development . This has been discussed with the Town Attorney , who has no difficulty with the concept . Staff Recommendation : Approval • 4. ) Schober Building-Conditional Use Permit This is a resubmittal of a Conditional. Use Request that was denied by the PEC on March 13 , 1979 . This application has been revised considerably , with the square footage addition of usable space reduced from 2 , 906 square feet to 1 , 859 square feet . The major change , as shown to you on March 27 , 1979 , was a Memo to PEC 4-6-79 Page Two decrease in the extension of the building on the North side . Another change has been added to this application since you saw it two weeks ago . This is the conversion of the two rooms into two -employee housing units by -the addition of small kitchenettes . The proposal that you saw on a preliminary basis two weeks ago had these two rooms converted into a Condominium Unit . With a commitment of the owner to keep these units as employee housing for a 20 year period, we feel that this latest proposal is superior . Staff Recommendation : Approval 5 . ) Creekside-Conditional Use Permit Postponed until April 24 , 1979 6 . ) Lionsridge Employee Housing Project Postponed until April 24 , 1979 7. ) Manor Vail Deck Request This matter was forwarded to you by the Town Council . The request is for a redwood deck behind the Manor Vail Buildings that would extend into the Town of Vail Stream Tract Land. This deck would be placed on the hillside overlooking the stream and would be used as a meeting area for business groups staying at the Manor Vail Lodge.. The deck would be constructed in such a way that little grading work would have to be done on the bank . Staff Recommendation : Disapproval We feel that this would set a negative precedent on the use of streamside land. This streamside land should be open for use by the general public , and should not become restricted private space for any one entity . 8 . ) Public/Private Recommendations There will be specific recommendations on all the projects available Monday at noon . PUBLIC NOTICE NOTICE IS HEREBY GIVEN that Ron McCaughan of Landmark Properties is requesting approval of the First Phase of a Townhouse Project located on a 5.6 acre unplatted parcel in Bighorn. Application has been made in accordance with Section 17.16 .100 of the Town of Vail Municipal Code. A Public Hearing will be held in accordance with Section 18.66 .060 of the Municipal Code on April 10, 1979 at 3:00 P.M. before the Town of Vail Planning & Environmental Commission. Said hearing will be held in the Vail Municipal Building. TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT i147` - ,/ James A. Rubin Zoning Administrator Published in theVail., Trail April 6 , 1979 °vv\ L 1 , ' ''''':::::-,1--'' f '''' ',Z,.' [ ■ „ . . / - ! 4 /-3-i,.. --7 ! -,, 1,1 2:: c , / f ,,,,... • .- 1.,.., ,, &, .„, „,,,,,,, "-- i_,;:,-.+,,,,,,,,.,,,,, .)•• . , , .. ,. , / ', , .,-, I ;■ i ,-- ‘, , , J ---/ c- i '1J--„.-1, - .,. ';:'--;, ' i- ' -- ,,,,,,.„4 (..,„,...„ -;-•,„ ,,,,,,, ,,,,,,.„ ,,,,2, ., ,,,, .....„„„, . .. -;/•, , , ;i• L... ......„,_).... /--,v. d ,.. . , , cr:;.; ,.\, ..,•-•-, „,..!‘„, ,,•\, ',, c _ i + ,-, c.,..\ )—.....„ 91,, ,,, ,,,,„„,,, . . , ;,- •. --„, ,,,,-.../...11,-;; , , +,.. is-• I) Q.,,,, . , / , ,'\ ... \,......._,/ , ! „H'1 D' .-,+, :::-:•74„, ;„7,T,:‘ ' ' ', ".”-' ,Z, I -'' ,..>•<, ,....,........... ..... .„ „-. , I '-',.i.,4,-,,',,, k", ,.„') '---.'' ''''''-',- . . i . /(1\\., '\..) , Li( .• )(7: r I' ' ...., ,.,A,, .,„„ c i .„. ! ,.. ■-•' = „.. , ---————, , . X ,,,,,,.., -7 03 „.. /00 r ', r; ,,-,,,. , I ; , , L;1 ,`` ,"' VC`, ''''''''' '`i: ''` '' . . , .......-,- ,,........0 i ,,,,,\,, \ / (!---!, ! i t1 .k.',',/\ l'!='::! \''k"'''' 4..-'.-1 1:4 (:>./ 1'—e1 •.. „ ,., 1 :,',„ /. .„ / ':', ' ..', . . ,.I ■ ..: fl • „.., ,..„....,- 1 , . _. \..„, .„.._ i•,, ....,, .... :.:,. ! - ,... / 3 ` , {1' v, {ji} � ro d , ,i( / 1 } '.. ti. l' ) eli's 7a„, I c` ili ,,,,l1 Al :1/14,---, _..4 ,'.4 ( 14/ 277 r�H_ '-'76.ti-Y- 3. >n ,, 1 ' 1) , iw c 6 / 6 , -- Ax 1 ,2,„ '1 -44- CR:4,---4)-1 -,i z„)\-+ 6 } ''), ,c,z il' 4)../ ■ , , 11,-Dix -),-, / tia, ) „.„ ri xm °. e� ,, 1. y 4.)ir1i. 1A-1 1 - 4 )`-'1 ,,,,c:2,--ci() -t-Ak 1 ‘,:„(C f‘,,,,,, L 1 PUBLIC NOTICE NOTICE IS HEREBY GIVEN that Ron McCaughan of Landmark Properties is requesting approval of the First Phase of a Townhouse Project located on a 5.6 acre unplatted parcel in Bighorn. Application has been made in accordance with Section 17. 16. 100 of the Town of Vail Municipal Code. A Public Hearing will be held in accordance with Section 18 .66 .060 of the Municipal Code on April 10, 1979 at 3:00 P.M. before the Town of Vail Planning & Environmental Commission . Said hearing will be held in the Vail Municipal Building. TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 0.--- ...(, 771 „.7, r4 , ,,,f-E/Lt--LTh James A. Rubin Zoning Administrator Published in the Vail Trail April 6, 1979 • I Ai tEYD Of Val box 100 department of community development vail, colorado 81657 (303) 476-5613 May 9, 1979 Candace Joehning Landmark Properties, Inc. 3033 South Parker Road Market Towers 1 Suite 604 Denver, CO 80231 Re: Sundial Phase I Townhouse Plat Dear Candace: I am in receipt of the Townhouse Plat and the Declarations for the first phase of Sundial. Everything seems to be in order and I appreciate your working with me on this rather complex matter. One item that I think still needs to be addressed is the timing of the installment of. utilities and the road. We would very much appreciate that the utilities and the road leading to the five parcels be installed prior to the issuance of a building permit on any of the five parcels. You will definitely need water before any framing is started, but it would advisable to have all the utilities in by that time. We have run into problems in the past when utilities in new subdivisions have not been completely installed at the time when construction started, and have become the middle man when we refused to issue Certificates of Occupancy. If you have any problems with this or anything else, please let me know. Sincerely, f°01.0,4420 James A. Rubin Zoning Administrator MEMORANDUM TO ARCHITECTS IN 'TIE TOWN OF VAIL FROM DEPARTMENT OF COMMUNITY DEVELOPMENT JIM RUBIN , ZONING ADMINISTRATOR DATE 20 FEBRUARY 1979 RE PROCEDURES FOR THE DESIGN REVIEW BOARD The enclosed packet of material will hopefully simplify and clarify the Design Review Board process . Sheets 1 and 2 explain when the Design Review Board meets, which items the Design Review Board reviews , and what needs to be submitted by the applicant . Sheets 3 and 4 are material lists that are to. be filled out by the applicant . These lists. will facilitate the record keeping operations of the Department . If there are material changes, they can be marked down on the sheets rather than submittal of a revised set of plans . Sheet 5 is a Design Review Board Check-List which is to be used by the Design Review Board in reviewing applications. It lists the types of considerations that will be discussed by the Design Review Board . I hope these new procedures are acceptable. If you have any questions or suggestions , please contact this office. Dated: February 19 , 1979 I MPORTANT NOTICE REGARDING ALL SUBMISSIONS TO TIIE DESIGN REVIEW BOARD: 1 . ) The Design Review Board meets every Thursday at 3 P.M. in the Town of Vail Municipal Building. (Except when the meeting is cancelled by the Zoning Administrator. ) 2. ) All persons wanting to appear before the Design Review Board must contact the Department of Community Development no later than 12 noon on the Monday of the week prior to the meeting so that all Agenda items can be published in The Vail Trail newspaper. 3 . ) All materials to be reviewed by the DRB must be received by the Department of Community Development no later than 12 : 00 noon on the Monday of the week prior to the meeting. 4. ) All new buildings will require a site visit by either the Design Review Board or the staff. Your building locations and driveways should be staked (weather. permitting) . 5 . ) The review process for NEW BUILDINGS will normally involve two spearate meetings of the Design Review Board , so plan on at least two weeks for their approval . 6 . ) People who fail to appear before the Design Review Board at their scheduled meeting and who have not asked for a postponement , will be required to be republished. 7. ) The following items no longer have to be presented to the Design Review Board. They , however , have to be presented to the .Zoning Administrator for approval : a. ) Windows , skylights and similar exterior changes that do not alter the existing plane of the building. b. ) Building additions that are not viewed from any other lot or public space; have had letters submitted from adjoining property owners approving the addition" and/or approval from the agent for, or manager of a Condominium Association . c. ) Phased developments that have had a Master Plan approved by the Design Review Board. • - -- -:------------- .- Mr ILRIA O W .,1.1v;. Ill.!! ( 1 ;; ,n (y fl . ....._ ... ....... _ . ...._..,._.,.. _ _ , A. KW COii`',Tic1JCT[ON: - 1 .) Topocjraj�.hic Map the Site: . • , • a. ) Contour intervals of 'not more than 2 ' if the ' slope is 20% or Tess, or not more than 10' if the average , ' • 'slope of the site is. greater than 20%; b. ) existing trees or groups of trees having trunks with . • diameters of 4" or more 1 ' above grade; • c. ) rock outcroppings and• other significant natural features ; and • d, ) avalanche and/ or flood plain areas and slopes over 40%. • 2.) Site grading and .drainage plan: • •• • • • . a. ) Include provisions for surface drainage on or off the site. 3. ) Site Plan (1 "= 20' or larger) : . a.) Show existing or proposed structures, landscaped areas , - service areas , storage areas, walks , driveways , off-street ° . parking, loading areas and other site improvements ; and • h. ) landscaping and screening of off-street parking and loading areas shall be shown , as shall be the locations of all ' utility hook-ups and above-ground utility installations. • A.) Landscape Plan (1 "= 20 ' or larger) : . a. ) Show the location of 4" diameter trees , other shrubs and native plants that are on the site and the location and • design of proposed landscape areas with the varieties • and approximate sizes of plant materials to be planted. • 5, ) Architectural Plans (1/8'1= 1 ' or larger) : ' . • a. ) Must include floor plans and all elevations as they will appear on completion; and b.) exterior surfacing materials and colors shall be . ' specified and 'submitted for :review. - G;) The ORB may require the submission of additional plans , drawings , • • • - specifications , samples and other material if deemed necessary to • determine whether a project will comply with design guidelines. . Models may be required. . •B.) MINOR. ALTERATIONS TO -THE EXTERIOR OF BUILDINGS, LANDSCAPING: ' 1 .) Photos or sketches that clearly indicate what is proposed maybe • submitted in lieu of the more formal requirements given above . as long as they provide all important. specifications for the ' • • t�roposal including colors and materials to .be used. . C. ) ADDITOS t;ESIDEi;TIAL ORCO ;ERCInt.: 1 .) Original floor plans with all specifications shown. • ' • • 2.) Floor plan for addition. • 3.) Site plan showing existing and proposed construction. . 4. ) Fl.ev�al.ions of addition. ' . . , 5. ) Photos of existing structure. . 6. ) Specifications for all materiels and color :.Mples • ))1 e LIST OF MATERIALS NAME OF PROJECT (13(_. LEGAL DESCRIPTION LOT BLOCK FILING DESCRIPTION OF PROJECT 7,22,\ The following information is required for submittal by the Applicant to the Design Review Board before a final approval can be given. A. ) BUILDING MATERIALS : Type of Material Color Roof ( Siding Other Wall Materials Fascia ;;• ' Soffits , M Windows li , Window Trim Doors Door Trim Hand or Deck Rails "•>";, re:D Flues W\I • !‘, Flashings Chimneys Trash Enclosures Greenhouses Other 177.1"5 T.) PLANT MATERIALS (Vegetative , Landscaping Materials including Trees , Shrubs , and Ground Cover) Eotanical Name Common Name Quantity Size 472i4 , „ elom M42;I. iv. 1 Page 2 Plant Materials Continued Botanical Name Couuuon Name Quantity Size C . ) OTHER LANDSCAPE FEATURES (Retaining Walls , Fences , Swimming Pools , etc . ) (Please Specify) NOTE — COPY OF PERMIT TO BE KEPT ON JOBSITE �l ', '-c-'7 CONSTRUCTION DATE 1/13/93 - Rec'd 5905 10110 O HI 1.TYPE OF CONSTRUCTION I I I I I I I V V PERMIT NO. department of community development 2.OCCUPANCY GROUP A B E H I R M BUILDING 17,000 TO BE FILLED OUT COMPLETELY PRIOR TO ISSUANCEOF PERMIT !, DIVISION 1 2 2a 3 4 oz ELECTRICAL 4,000 GENERAL DESCRIPTION OF WORK • a PLUMBING 2,000 TYPE OF PERMIT Finished Basement > © BUILDING � PLUMBING MECHANICAL ® ELECTRICAL ❑ FOUNDATION MECHANICAL � �`i.000 ADDRESS: .5040 Main Ere , ("� I �� TYPE GROUP G.R.F.A. VALUATION PERMIT FEES LEGAL LOT Sundial BLK 1�0t1� V R1 BUILDING PERMIT 275.00 -.ESC. FILING Phase #2 PLAN CHECK 179.00 JOB NAME: ELECTRICAL 72.00 Hickey Basement _ OWNER NAME NEW( ) ALTERATION(X) ADDITIONAL( ) REPAIR( ) PLUMBING 30.00/pc=$8.00 #41334 T MAIL ADDRESS 5040 Main Gore lr DWELLING UNITS ACCOMMODATION UNITS MECHANICAL Al , CITY PH. HEIGHT IN FT. NO.FIREPLACES RECREATION FEE o� INSULATION: TYPE THICKNESS R-VALLUE DESIGN REVIEW BOARD ARCHITECT FIRM E. Daniels MAIL ADDRESS 5040 Gore Dr. A5 FLOOR CLEAN-UP DEPOSIT 100.00 '''4J.'''"---. CITY Vail PH. EXT.WALLS USE TAX �� ° ROOF fee- y � GENERAL FIRM Taylor Const. .� h zr f� J(�o. ,�, TYPE ELEC. GAS fr6 :8@ b6�i .0• CONTRACTOR TOWN OF VAIL REG. NO. 41-f- OF TOTAL PERMIT FEES / rz> \L' TELE. 949-7124 ` HEAT SOLAR WOOD � � �� 1 '� -BUILDING Fat dnann — — -_ — — 5-/93 — -- FIRM x <N ADDITIONAL PERMITS NEEDED: -BUILDING IFFICIAL DATE LECTRICAL Y N INITIAL �� i CONTRACTOR TOWN OF VAIL REG.NO. " — ST.CUT --¢-- � �� I ZONING ADMI STRATOR DOE TELE. 949-1662 BLASTING ZONING& BUILDING. OTE Vl FIRM Vail Valley Plumbing PARKING �y �� �,, —v-�A, , nn( � PLUMBING TOWN OF VAIL REG. NO. 118-P `A o;�-✓y}�a v�C/ (�+� CONTRACTOR DEMO TELE. 949-7771 FIRM none I hereby acknowledge that I have read this application, filled out in full the information required, MECHANICAL completed an accurate plot plan, and state that all the information provided as required is correct. I CONTRACTOR TOWN OF VAIL REG. NO. agree to comply with the information and plot plan, to comply with all Town ordinances and state TELE. laws, and to build this structure according to the Town's zoning and subdivision codes, design review approved, Uniform Building Code and other ordina ces of the Ton app able thereto. ( HER FIRM / / / ,' TOWN OF VAIL REG. NO. SIGN TURE OF OWNER OR C('NTRACT6R FOR HIMSELF CONTRACTOR TELE. AND THE OWNER. VINIMS CONSTRUCTION PERMIT or NOTE -- COPY OF PERMIT TO BE KEPT ON JOBSITE jr--.:72/1�� �• ••• ^��, '�IJ '�0 G �Y� DATE /7��1 L Q �c c.) _ _..� •�' PERMIT NO. ' m' 1.TYPE OF CONSTRUCTION III III 1 VV/� department of community development 2.OCCUPANCY GROUP A B E H e M BUILDING /7 00 c I'2.i,.i • ELECTRICAL '.. TO BE FILLED OUT COMPLETELY PRIOR TO ISSUANCE OF PERMIT DIVISION �2 2a 3 4 = 3/ S(f�J j�t/n GENERAL DESCRIPTION OF WORK: a PLUMBING TYPE OF PERMIT /��"✓:r( �� ea J?du r��� - 2 U°a 2-' ( Ci BUILDING ❑ PLUMBING > MECHANICAL I �' ❑ ELECTRICAL ❑ FOUNDATION °' �� `E_ MECHANICAL Pill ADDRESS: 15-0 VC /!ill iA) C/ Oie_ TYPE GROUP G.R.F.A. VALUATION PERMIT FEES LEGAL LOT SJI,J:c i 1 J tIBLk V al BUILDING PERMIT 6 t'i�tl1�, 4 Z � - DESC. FILING PLAN CHECK ; -i t0 ELECTRICAL 3 NAME: I �� �G.s b� t=4,7 OWNER .: j NEW( ) ALTERATION) ADDITIONAL( ) REPAIR( ) PLUMBING /_--) MAIL ADDRESS y1'i 0 (t og.r O�J_,I4( DWELLING UNITS — ACCOMMODATION UNITS MECHANICAL CITY r./ PH.47G-lik HEIGHT IN FT. NO.FIREPLACES RECREATION FEE ARCHITECT FIRM ff. , ocit/C+ 4-`S INSULATION: TYPE THICKNESS R-VALLUE icy FLOOR MAIL ADDRESS 50Lt 0 Gokr 02• 3 - _---__—. _ CLEAN-UP DEPOSIT 1 i 0 EXT WALLS CITY U(3,i l PH. j USE TAX I ,� ROOF■GENERAL FIRM -Iu ldv C J ( ' ___ _ __ . TYPE ELEC. GAS CONTRACTOR TOWN QF VAIL REG. NO. OF TOTAL PE• IT FEES � (o � - I GI- HEAT SOLAR WOOD ° - -- - - - TELE. { I Z— —--- - a,t ., ,/e:--1-. ,_ _ I \`;_ J v_ FIRM �'C,Orj J lit e�I r i j ADDITIONAL PERMITS NEEDED: ,BUILD�GOF�AI. — S, F' ceTRICAL F Y ■i N INITIAL L. RACTOR TOWN OF VAIL REG.NO, 1"% ��J ST.CUT i ZONING ADMINISTRATOR DATE TELE. ci L1 C1 - it) 2 BLASTING _ ZONING&BUILDING NOTES: FIRM ileaL UGItti el) �U< PARKING PLUMBING TOWN OF VAIL REG.NO, 110-e CONTRACTOR DEMO TELE. 9-LI j - -1111 i FIRM 0 n.) I hereby acknowledge that I have read this application, filled out in full the Information required, MECHANICAL completed an accurate plotpian, and state that all the information provided as required is correct. I CONTRACTOR TOWN OF VAIL REG.NO. agree to comply with the information and plot plan, to comply with all Town ordinances and state TELE. laws, and to build this structure according to the Town's zoning and subdivision codes, design -- - --- - review approved, Uniform Building Code and other ordinances of the To n applicable thereto. OTHER FIRM CLEAN UP DEPOSIT TO: .g‘,/t7 - TOWN OF VAIL REG.NO. IGNATURE OF OWNER OR NTRACTOR FOR HIMSELF CONTRACTOR TELE. AND THE OWNER. Plan Review Based on the 1992 Uniform Codes NAME :HICKEY DATE : 1/25/93 ADDRESS : 5040 MAIN GORE DR. #A1 CONTRACTOR: TAYLOR CONST . VAIL, COLORADO ARCHITECT :DANIELS OCCUPANCY :R1 ENGINEER:NONE TYPE OF CONSTRUCTION:V PLANS EXAMINER:C . FELDMANN CORRECTIONS REQUIRED The items listed below are not intended to be a complete listing of all possible code requirements in the adopted codes . It is a guide to selected sections of the codes . The following is not to be construed to be an approval of any violation of any of the pro- visions of the adopted codes or any ordinance of the Town of Vail . 1) SMOKE DETECTORS ARE REQUIRED PER SEC . 1210 OF THE 1991 UBC . 2) EGRESS WINDOW IS REQUIRED PER SEC . 1204 OF THE 1991 UBC . THE MAXIMUM SILL HEIGHT IS 44" . 3) WINDOW WELL DRAIN IS REQUIRED TO BUILDING FOUNDATION DRAIN . 4) STAIRS AND HANDRAIL MUST COMPLY WITH SEC . 3306 OF THE 1991 UBC . STAIRWAY MUST BE 36" IN WIDTH AND HANDRAIL BE BETWEEN 34" AND 38" ABOVE NOSING OF TREAD . 5) FIELD INSPECTIONS ARE REQUIRED FOR CODE COMPLIANCE . ;,. .1 i _1 T_- rA , . °-- - - _ _- _ . . . - , ti �,� i _. :- r ' , { i _4. , ` • -4 X5� - ,,, \. • _-- . ,'• Z q' n • • i R_ • i A may' � _ .•-•r•.v_�,■}„ IIF 1 .- °` r r r • ‘► k , , • .4,10:„......' AY G ` { N, 4 x . f"r J t n « +r , ,, "3T?M. 4,^ 4.,.,t: ). -, ...7;■• ' . • w !1 ". ,..„ • +I . i a " . • * >. •i .:•• $' 4 • „ 1 ,._ .. ' yr: . ..r;.. r • A•✓. r - 1 • fie. 1 ' , ,� +} .e 1Y •. ÷" , •I!f• I•t.;9 fA .,•.-'. a 1 ' 111 M 1." ''' Arej.„5, , I. , rs,„ ,,,,, ;, q • , • ' . , `'"..sic,„ , ,,,„i . ... . i . , • r , •. v r t . • ,N,,`-). • t ; ,:k. el.!'1,;.,,04.- - . '.. I, .. ..,. i".7- , , .. _, Li 10+4 S/C43 (1/4 '. . . 7 4,(.,..,... f ,_i,,,, 1.4 ( ,. . i„ ..„,.. r., IA h a x• # ir-me, y�.1 al I , Q. .>•4 rpalF � � .•�' -.rte r,' .F , ...r. ' fr i -,. - .1t i 4.. - g . , , . '‘ i 1r li"- _1/41 ... , 4444/,a 'F1 : . oGQ ' , }f •-•k >ti + tlr sQ4' •• , ,. • • �Q _�� _. - _ -7�-sf.-2¢r '=lam ,• 'a 4 ~ •• a Al' p ,: {' �. ,r ,• W * j JJ // . r> s;.: : 'P.�#,..,tl "1„". ;'i`.''.rf 11: .r-` r .i; ..• p _ - , iy, ,•,r 4,, k. r▪ t .:. . I Ir I 1 0 v ..•.-. •. 1. , f. . '. , .t ' 1;i _, i jpk, • , 0 1 i / c • . . '- 4 -.4•4 . .., _ .- ...., I epi \ S ' -4— �~ i -d1 / I A id L r 1--- --1 .1 xt ''►yyl,�.' I T { ' t:,`: { -r••�}41 r!1_ ,.II IT * / err. ^ - �� •,..-ji, ,,',,:-., *t., • -11,fcts 4. Y, +.'7 '' ( •.,' '�7 E f .J I '` l/ 'g._, �•J �' � J' 1A1►./vVV ,s1 ,{,?. ' i ,1 - / ...,- -.. .. , ' 1-4 ,,,,..,,cn ' • • i .y/ far • / , il . —- ., �VF r f ■ . + r , �t x • .iI ■T 4 Jr,t. 4,,,,,,,,, ; .. , ,.. ., ,,,,„, .. , ,)0 . i . 4 4 i lr , ..., A I • I `yam i 4 ■ /' t,"c? I ' c�.. ,,,, 1{wr t:y.4 hAA i' ,_ t off' `u" 4..., e., L",r`w • r 0;;..•OW, . ' * 1,1 / / ( q 4 I 1 • 1.-- •--'--- C w }>r. i �4+'�r, 'OD t1L�JC1t/t/;.‘"rf:' t : •.. : __,, /0// 6; . 1 _t t.i, by .'!f hlf I •' , { .'4 , ��Ir(( / i ,►Iy1 • t. ,., • rte'• • t t •\� l / , , �' - • • .!. ` " . « + j { - h_ is p ` 3 l i • •f 1 } 4 1 , .•, ` 3 • 1 ,�' ( f } ►\ �.� o•r _ —..T.-..�....'-- --'w.► it 5• - g /' 1 i ' • •+ ,� •Y •• s♦ •, �� �. t i �•� • ty 9 , • • f ',♦ _1q..iri - " _ "r - 'f ` ,••; ; 4 }ell.. ,{AF•r..r. ! 1 -....._j�• • .— �— — - - , l' l I �1 ° ( r�. ,Ir • •• �'0'- 4 f a • • 1i , + . `s. - ' , .. J' -.r-^..••��"'P"r�-""„r^j- `*7 ' '(� p r 9 t y • 4 ` , • . - • , • -N. ' 0. •,, .), ^ e .'p - f 1 , f, .- ` 1 '' r- F + „ -• t '� ` r r I{ c�►F�r�'.fr �. it ! V . ._. In Y i 1 `1 s r 1 ■ I f " i �4 a. Df�l+1 „3 i t ``�V.7``� +E �+/� j a tr'`f, •� M 1 • • 4� ! .�' , f r ' i — I +•rte .>;:.'.�,?k'D i 1� }• ' .+f, _ '3k1W'+'i ,+�.�1'"l3RJWlhs 1V - 1. Y • ' 1 d Z N,�,��J1 ' t I ►il_►.r.f ►-t j. .__ 4 1• kW .1 I i �fl •• -� ► • =+ Ki�"'� T• ',( .J"�'1�. w�' r�=: I :� ;' '•. n r 1 11F!^"' a ` i I , J } 1 , { ` _ L .l fie. M1 O' F 011 r t.- t--..);31,,,---.;:-:. , �?�? i *� , i �,v t3 4- � _ ZA T 1 II j FIELD Q -)'I:TZ�•1 r` 1'ti ) A ; , ``',;,4►t,.', r"Et• Ai L i :t:▪ , yiwa. '�' I` , u s r, I {/, ill t _ .,.. -_—__..�..�,._ —• — _. �/�� k �fy3 ,g,,.( "a,`1"\ }1 :r.....1.4 J J 1: `, '1 i ` f ' , fi"- i4,...---,-,,_. . A _ - 1 . a , ' ! . �, E L E.41 . Lae 4 + to Zvi E5Y .. 'y i 4, t, ► j , r , -. •• IAN "."(i t, tJ 1'r'� C,, �, 1.,, �.,^ day - .,, � —�- o ' 1 WALL- �:.�._ M, i+�.�.�awe � ,�;c��r•...�,-r� - a " 4 , ;{ I III .� _ �. _._._..._.d_ /OM of Vail Community. ,;�. �► I '� 1 1 i I I 7„r.- 0 1 Development .. -, r.• • t k , 1 f I . I • 1 { I `' Pies Build Healh Ffra +, . . 1 I 1•t f `� -•• , .* i i I , ' �`�« "approved 0 - Q ,a R r.. r,l r +r■� 'X i _ ^. �.-Ear r`- --- r .r .►-•,rr,- ---...• -....k, do to ,• ��; �, 1 • L ,•, •tyl iF�1 t. '+� -'�'! L �• .4 ; • �._ ,� i + p . 1 . - �M1 1 Denied -0,-- '. 0-- _ ..._I ....�/` -I�., ,� •• • 1 I •' .`� �a ,°!!/F` 1�1•' . ..tea •irr� - ..- �' 5 L �� �• c ' 1"""''. ! -,. __ : i.- ar:'i ' ' f Validity of Permit, r.. " - ' ,y� ,� �.�. w r �. r! ` M a • y,..l�"{L11,v/ 1 \1��. :�� i 1 n • 4 S Sec. J1/J �V� �,7 U.B.C. ' 41. • t- µ;! o ,. ' • �'' q ` ? w ` { l+ k Arp+ ,tom Y�'»I�+�srtc�httL •T ice. + I •,3?` 9 9 p PR p a " r ��1IC,ns shal4anol'�beconstruetlttarbe aroval 0# ,s and, .7T 7' 'r '1 +f e. A `� • - - - - • r _4 ';- Kermit tor, or an, ,1 ' 1 :.:. .< r ' + :�' � it r y +� r_ d of any kiation of any of,the provisions of this cc1 , ,,' ` . i . , r" �# . •,� .1 ►a":_i A y other otdlAanCe of the jurisdication. The'tssuance',tf'1 .,.,'.• ' r: +� w r „ i' D:r j#' « r , l i 11DS� illlT•1 .1� IG OC �' ,e i , I. •4 r + F •,s , " ' I i / `•� 1 1...... • ► .`� _ °" . based'upon plans, specifications and-e'Elier�data snail " ,',K: f,'",,,;.' ►, " ' Y : • `'` N, ,' - '•,' _�, ,+ 't'•ALL= f� G tiL• arj E 'w . vent the building.official from #hereaft� �1"quirillg"tt,i x. x .; - - _ _ -_ „ +► of errors m said plans. specificati--Cr: - cr► • . /" j .. =a� • . �► .�... - ion s specifications arr.. ots��..... _. . '':;r 6' '.. , . !_ f ,'�}: o !• - '�. F 'i'r•" ♦'�j' � Y / 6'�N �1r� , !• 4,�.0',4 . , .,:, . . , 10- N+ ,, t .t' ' `` { -- — -r._ ,._— — _ 1.M11►+1 11oLD PT . 1.. ittlf' v 4 — • _ J.,.r. .... ,. �.. ^+.rr•y«,r�'+-r'w`.' `j ' 3 - w ` 1 --±� • A v �"� +7 t �^r"�'.�" _"51'. . L.o • I 1/..,. J .........ftwomt. . 4 "* - r.--` O - r; ' 1 :, 1 '.'� . .-_..r .,I • "A ►• ,, ' .- .. l •" - ..f,r,� - ` I •_ �F. J1G ,� 1� -{i Oi1:hT1'ir(i'.J F'- _ 4- , �, .- 1 L� � - -'i'..I '�" \' � ;�F 34168k, • 'may s * R ^�. S � rirf K rte_ `. () 1 l • ,, 1{ , , y �,�r,i�p 4"444.0,1*.w i �'i411 T w� . �. r y •.•r y..."*. .T s . _ S,� ..�h • • '� ,��'�' r 1� r �// Y[- � r a 4 , � a ►, 4.r-7 Yrlw► e. i- N+ t'''6 Y 1l,.tii_f� • red f mil. < r J�1�� [``� �^�} /�Z � tf .Y h.} ' ,FI r rk '',01 ,/ •� • , • 1 •, .I�� + ♦ , ri' '4 , ,,..1 ro 1 fy, "YS+ .� 1 *irT% W7, fr �it PLANS'V- � IFS �h►t� b •♦ e • e'r - - 0 , • .. • , v • r i • " 5,`1■r • , 1 . r J / • {[yam/� ' �( ' • ,-• �},�. �' t+Y.•Air �r � "r ��$ - �Y � 5 r7� .1 + FOP P �+ \ 'A. /C w-r, , s•• ..' •• .,#4�•9 •-{!•' t ' `+ • t y r"",Jy t � +' , a' n '�• •• t••( a, ,r • i• .:},]'F1'.''yyl: r ; .. .A 4,:.!.'4*.:;` ' t`. , ., • • - :' t SUNDIAL /��I�r'•�/] ■�■ J{r ,,, ",yj,.+r ��.rT ., ,. •t?f M F; ;,.-1.- '•'S`,+ , 4 ' , ? A . w<, -),�./ .1■�,• �'i'�'�"� • '.�_ , 2. , .• rte, .' y :rz. A _ ; . • •• yCy l t.,w ; r . , ., •. ..1. ;.. ,ti +,/,� _ ti f', ,}� [ � I I-• r pthcE•.r« it'' k! a• •+..- • .. r T �' 7„, r---4. jii '.i" w , -1' '1' ,s.;.•, ar.�°. i ''� IC)/22 Qry • r ,y! { �l• ;"� Via,• i . : ?; r _.. � r �, ""' �, t' Ma �ho F i!• l,. i 1c I•.� . `i.+.�Krk4e"�,' '- , - 1 t� �,.. +...'. `f ! I rr� h 1 +n,r 42'1.1_4., r� p N +, .� h a - 'll* ,t " *=•' i ,, f ; ; «.• ', ,' '.,;} '� I• H • j• ,i4, 't , 1{ O. ,\'�;�1'" a '''• 4 r a \ o' /� .'v �' • - •• •�+ ,� • a \{'s _ - _ ...�...a �• + l- f ti, ! { .µ �, {•Y, ., r'� ,i .. A ' y i '''',' ... �..r+.....,�*r.•�+...•� r ,-fi�re..44., + . •' , *y,•F J .� , + ./ „ a . 'h...y.nr f 4,, Y .' •K J4'+ + . Ai:1'It' s�,.}rF w a'. F !! ti _s..w...• -w'w+ro ".M►M�'y'r'' , .'fir \ - I 1 M, �•�' ,. ,, il+l. J,r :^'y , rw • TO* ., , ! ; . a. ",'> •*"fit•'++ K . ` .'-�+-+.r..'�7r+'!'.►�'r ^r—"" ,�••�1- .. tr;' ,►. \ ' a - i' '~ -T - ,r ' tt' -T 1.. aa if/ii .y�. ., ,. ,y M.� or,-. �.-..• P;}.'�• r« g. r . � . • ,'r; w! ,ir� R .,'�' '��1-• t +s '!r 1• r,,• '.�{ .4 s .; t Y %• -,...... . . REVISIONS BY 1 , . . • • /1 ...... , . . , , - ■ 11 L) W ' \ iC ■ ,. ./ - .(- , N------ I . . , =re 1 ,..„ C-34 4 CZ:7 1 C.--; .T1 r,3 • i'3 . 40 4 . . --- I u)_ . 'f' //-- . * _ _ _____ _ ____ ____ _______ I-- N- W . NI . II , i . e 144 fr4.4* \4P-4-, _____4 - W-7rit1/41* &7,46, Ame-AA-00‘.1 -, R-(vAt,4-k- 054. P Lki-1 ...f.0-t iz, L' -1 -4:::. t . Y J .12x rizmoev \,444.4.... c NblE- ,...,51ofocA__ ....biktis \le14 ic2.'-olj (-ro Pligre4 ei,3q104/... 0,04.1 vtib• so-1,44.......______............._.,....•............_•_...,._, 06e0.24 , 51--oce ; ire,c4g..6-p 0,K., --c 5 l_ li .i _r --- , rvi„ma4 -icr ,,s4.,,,t.. (tp oevep) A TO VtIN 0 F VA i L %A A4.160.04., 1 :1..T$ 420‘)et.e... craie- vv4.,\vAt,,.. ) , I , 4047._ eitta-taiL- 7.----Thlig:Atifoivep.47)4,1„Ir ./tisii,IL.. r cz:, "„...„1.1,„.4/4,0...ale,virizestilsi - ,. ..\ . 0 v . , ., ,h,lute:st_I , _., 0\JF(pi.:1_,) _,4___(•,„(.0. No, iv . .i.„ c. r-it7e- 4.r r. A.— fir - .S .rr' . si6fP&V. Fet71- \> --,A]., t- .-st&-;--c---1-----.4---e- -c■-_-/ :-...,- ,s,, .- ,.--_.. - ,, .0144-,II, .rertpsic. 1 . ... 60•.% ri I.-4-.., .N. (2) K.0. 6 ' ,.,a, --- . _te). o-T (_ , 1 Ar \ re- (.4 ..142)3454*4 ma. -A verafi.4, - WA-1 9 VelPL C., P ( 2KTI'lia1 \\ 4),c. , 1■: ,..-- 11,4V-4614 4.i.)e, -To f5IA )( r4,4wili9C 4T e*Se MeiE- AvO ez) Kit., S f 2 4 E E A r,.-1 etetTiTtlu4"4- . 6-11PII A - A , ,/, f\tiLie--/t) if Ar. i ..3-Abi-41.i.e.. *AAA-. 11/4.10,r6- ,e- ....c.-Tict,A AA r ,„ 1,),44_1 ,Jr', t.A...)_14,3/ pWP 4,219.2 Date 124 ,JA0s1 43.5 14(2 Kt Viitt) FLAIA WeLeit A 614,ickle .i,4k.q.) elk) . 4,4:6 XY---Ace i2-k4e Ft scale ifV‘ i'--d r -rro . ( ( e ) K4. Drawn g . 4.45 :12 Job J, 41 ( Sheet A Of I Sheets A- 24 X 3 ;TINTED ON NO 100044 CLEARPRINT• • J� INSPECTION REQUEST PERMIT NUMBER OF PROJECT TOWN OF VAIL DATE ) -- '2b JOB NAME l%LW CALLER 0 W.{i-( — v1 L\-`6- -1 (- 4 / -,t-f ('d . READY FOR INSPECTION: MON TUES WED THUR FRT J� • L A PM LOCATION: 40 Mv ivcUjj Ur ) A BUILDING: PLUMBING: ❑ FOOTINGS / STEEL ❑ UNDERGROUND ❑ FOUNDATION / STEEL ❑ ROUGH / D.W.V. ❑ FRAMING ❑ ROUGH / WATER ❑ ROOF & SHEER ❑ GAS PIPING PLYWOOD NAILING ❑ INSULATION ❑ POOL / H. TUB SHE,ETROCK NAIL ❑ -- s' \J e/i)ill \(' MA. KC1,1111\ 1 Vraff-af-AWAV ?3,,,,,,, FINAL ❑ FINAL ELECTRICAL: MECHANICAL: ❑ TEMP. POWER ❑ HEATING ❑ ROUGH ❑ EXHAUST HOODS ❑ CONDUIT ❑ SUPPLY AIR ❑ ❑ ❑ FINAL ❑ FINAL ,,,,PPROVED ❑ DISAPPROVED ❑ REINSPECTION REQUIRED CORRECTIONS: DATE' ' ? INSPECTOR %'r t, j PRV1 SHOP f " J INSPECTION REQUEST PERMIT NUMBER OF PROJECT x.-.,,TOWN OF VAIL / 4_, DATE f a- -_ JOB NAME _ .�`!4', ' ' 7Lin0 \ CALLER i; r, 1. READY Fe" TION: ON TUES WED THUR -FRI (AM ) PM LOCATION` ` �. t - '. ? r� . BUILDING: PLUMBING: ❑ FOOTINGS / STEEL ❑ UNDERGROUND ❑ FOUNDATION / STEEL ❑ ROUGH / D.W.V. RAMING ' ❑ ROUGH / WATER ROOF & SHEER ❑ GAS PIPING PLYWOOD NAILING ❑ INSULATION ❑ POOL / H. TUB ❑ SHEETROCK NAIL ❑ ❑ ❑ ❑ FINAL ❑ FINAL ELECTRICAL: MECHANICAL: ❑ TEMP. POWER ❑ HEATING t ROUGH ❑ EXHAUST HOODS ❑ CONDUIT ❑ SUPPLY AIR ❑ ❑ ❑ FINAL ❑ FINAL ❑ APPROVED 0 DISAPPROVED `REINSPECTION REQUIRED CORRECTIONS: s � • DATE INSPECTOR PaIM'SHOP , ,.. - INSPECTION REQUEST PERMIT NUMBER''OF PROJECT s, ,. TOWN OF VAIL 'Y_`.. ' r '`r:)- '_ '' '-1 r 1, DATE r' B -� JOB NAME ' _ - CALLER : ,- A r- M1 i', w;. '-.�.`_'' 1 READY FOR INSPECTION: MON TUES WED THURL kFRI " (AM's PM lr, LOCATION: f'` 1` "t i°*,,,_ ' i` ' C. `-"€ x BUILDING: PLUMBING: ❑ FOOTINGS / STEEL ❑ UNDERGROUND ❑ FOUNDATION / STEEL ❑ ROUGH / O.W.V. FRAMING ❑ ROUGH /WATER ROOF & SHEER ❑ PLYWOOD NAILING` ❑ GAS PIPING ❑ INSULATION ❑ POOL/ H TUB ❑ SHEETROCK NAIL ❑ ❑ ❑ ❑ FINAL ❑ FINAL ELECTRICAL: MECHANICAL: ❑ TEMP. POWER ❑ HEATING ❑ ROUGH — ❑ EXHAUST HOODS ❑ CONDUIT ❑ SUPPLY AIR ❑ ❑ ❑ FINAL z,,,,,,,,./ ❑ FINAL -, ❑ APPROVED P DISAPPROVED REINSPECTION REQUIRED CORRECTIONS: ",,,,,„//-- ? ` #- / te , - 9 w DATE f— INSPECTOR t` -----� °" % ! >rr - PRIM'SHOP d A INS CTION REQUEST PERMIT NUMBE''''''''R OF PROJECT TOWN OF VAIL DATE i JOB NAME a✓ CALLER READY FOR INSPECTION: MON TUES ED R THU FR! AM PM LOCATION: 5 �` ' W`' BUILDING: PLUMBING: ❑ FOOTINGS / STEEL '' ❑ UNDERGROUND ❑ FOUNDATION / STEEL ❑ ROUGH / D.W.V. ❑,FRAMING ❑ ROUGH / WATER ROOF & SHEER ❑ PLYWOOD NAILING ❑ GAS PIPING ❑ INSULATION ❑ POOL / H. TUB ❑ SHEETROCK NAIL ❑ ❑ ❑ ❑ FINAL ❑ FINAL ELECTRICAL: MECHANICAL: ❑ TEMP. POWER ❑ HEATING ❑ ROUGH ❑ EXHAUST HOODS ❑ CONDUIT ❑ SUPPLY AIR ❑ ❑ ❑ FINAL ❑ FINAL °PROVED ❑ DISAPPROVED ❑ .REINSPECTION REQUIRED CORRECTIONS: INSPECTOR ''DATE r °,: tic= � '3C /2 INSPECTION REQUEST PERMIT NUMBER OF PROJECT ! TOWN OF VAIL DATE ' \ .-. JOB NAME ''-`±'` .'' ' (''' ,,,,' r _ CALLER ,.,,,,,r,},_,,,,, 1 READY FOR INSPECTION: N� TUES WED THUR' FRI i AM ' PM LOCATION: 3 . 'I''('j ''' , I`'' t�, y; c ' ( '" 1 `f ' ]t BUILDING: PLUMBING: ❑ FOOTINGS / STEEL ❑ UNDERGROUND ❑ FOUNDATION / STEEL 0 ROUGH / D.W.V. ❑ FRAMING 0 ROUGH / WATER ROOF & SHEER ❑ ❑ GAS PIPING PLYWOOD NAILING ❑ INSULATION ❑ POOL / H. TUB ❑ SHEETROCK NAIL ❑ ❑ ❑ q FINAL ❑ FINAL ELECTRICAL: MECHANICAL: ❑ TEMP. POWER ❑ HEATING ROUGH ❑ EXHAUST HOODS ❑ CONDUIT ❑ SUPPLY AIR 0 0 ❑ FINAL 0 FINAL ❑ APPROVED ❑ DISAPPROVED ❑'REINSPECTION REQUIRED CORRECTIONS: .,,,,,),,,,,,/.4,,,/,`' / .,,,,.,.,,,,,,,(.,„, "..,/,''',/,-i,e.,,'.-. .../-,.—. r //,, / - j ,J?. y,.-` /2 9t , , ` , n .� ,,,,c/e_///,‘2, --c, 7 f jt ' DATE c INSPECTOR - --%' %'z- °r° a y PRINT SHOP - ' ' ' '''r- '-'''''''',„',, - '-'-=/'- , ;r j INSPECTION REQUEST PERMIT NUM ROJECT TOWN OF VAiL � . DATE � � �'' JOB NAME �a � ' ,' �' � , - � -���-... CALLER � �� �--�_� �� {�,���'` ' .�:� READY FOR INSPECTION: MON TUES WED ,ITHUR FRI ,! 'SAM ~= 'PM LOCATION. , r a ` ,„t - _ ° ,'':',--2---''-----"--. BUILDING: PLUMBING: ❑ FOOTINGS / STEEL ❑ UNDERGROUND I: FOUNDATION / STEEL ❑ ROUGH / D.W.V ❑ FRAMING ❑ ROUGH /WATER ROOF & SHEER ❑ ❑ GAS PIPING PLYWOOD NAILING- INSULATION ❑ POOL / H. TUB ' fl SHEETROCK `NAIL ❑ fl FINAL ID'FINAL ELECTRICAL: MECHANICAL: ❑ TEMP. 'POWER El HEATING ❑ ROUGH` ❑ EXHAUST HOODS ❑' CONDUIT ❑ SUPPLY. AIR oo FINAL ❑ FINAL ' 'PROVED ❑ DISAPPROVED ❑ REINSPECTION REQUIRED CORRECTIONS: x. t /4, � . I DATE INSPECTOR ` ," pi,itrrSHOP _ ,i -7 INSPECTION REQUEST,f''I PERMIT NUMBER OF PROJECT - TOWN OF VAIL i i r. DATE � �� E ' �. JOB NAME �• 1 CALLER !{' / I 1 READY FOR INSPECTION: MON TUES WED THUR FRI j AM PM LOCATION: S ; [. a 1 - — —_r. BUILDING: PLUMBING: ❑ FOOTINGS / STEEL ❑ UNDERGROUND ❑ FOUNDATION / STEEL ❑ ROUGH / D.W.V. ❑ FRAMING ❑ ROUGH / WATER ❑ ROOF & SHEER ❑ GAS PIPING PLYWOOD NAILING ❑ INSULATION ❑ POOL / H. TUB ❑ SHEETROCK NAIL ❑ ❑ ❑ ❑ FINAL ❑ FINAL ELECTRICAL: MECHANICAL: ❑ TEMP. POWER ❑ HEATING ❑ ROUGH ❑ EXHAUST HOODS ❑ CONDUIT ❑ SUPPLY AIR ❑ ❑ FINAL ❑ FINAL XAPPROVED - ` ❑ DISAPPROVED ❑ REINSPECTION REQUIRED CORRECTIONS: p� , / 1. jy. C` DATE / - /` INSPECTOR %% J I TSHOP (, ' ¢ INSPECTION REQUEST PERMIT NUMBER OROJECT / TOWN OF VAIL t1 ): f) JOB NAME DATE ) , CALLER i /--°Z.76; ( L._—z 1. , READY FOR INSPECTION: MON 6U-E- WED THUR F I AM ' PM . n a LOCATION: 5(' ', 6i l (- �,�_ i _ 1------/-(:)‹.-.,-' � BUILDING: PLUMBING: ❑ FOOTINGS / STEEL ❑ UNDERGROUND ❑ FOUNDATION / STEEL ❑ ROUGH / D.W.V. ❑ FRAMING ❑ ROUGH / WATER ❑ ROOF & SHEER . ❑ GAS PIPING h PLYWOOD NAILING ❑ INSULATION ❑ POOL / H. TUB=' ❑ SHEETROCK NAIL ❑ _ _ ❑ ❑ FINAL ❑ FINAL ELECTRICAL: MECHANICAL: ❑ TEMP. POWER ❑ HEATING ❑ ROUGH ❑ EXHAUST HOODS ❑ CONDUIT ❑ SUPPLY AIR ❑ ❑ ❑ FINAL ❑ FINAL ❑ APPROVED ❑ DISAPPROVED E,E1 REINSPECTION REQUIRED CORRECTIONS: 0 ��.. ..ems . - - _ ,_ _,, ) Li -0-,�x� ., i--±��• ;"aa_���_ ' _ __._: .- L ,r DATE •7; i - / ;-7 INSPECTOR ,', ,-'1 J/ pRiasHOP- J (4// mil f '/-/ INSPECTION REQUEST PERMIT NUMBER OF PROJECT TOWN OF VAIL . DATE -5 //:-'±')/i`f :� JOB NAME ) CALLER j , t) _. READY FOR INSPECTION: MON TUES _WED THUR FRI ,.) PM LOCATION: l ij _% 41 (/-L... �. r L! ) BUILDING: PLUMBING: ❑ FOOTINGS / STEEL ❑ UNDERGROUND ❑ FOUNDATION / STEEL ❑ ROUGH / D.W.V. ❑ FRAMING ❑ ROUGH / WATER ❑ ROOF & SHEER ❑ GAS PIPING PLYWOOD NAILING ❑ INSULATION ❑ POOL / H. TUB XSHEETROCK NAIL ❑ ❑ ❑ ❑ FINAL ❑ FINAL ELECTRICAL: MECHANICAL: ❑ TEMP. POWER ❑ HEATING ❑ ROUGH ❑ EXHAUST HOODS ❑ CONDUIT ❑ SUPPLY AIR ❑ ❑ ❑ FINAL ❑ FINAL APPROVED ❑ DISAPPROVED ❑ REINSPECTION REQUIRED CORRECTIONS: E DATE z j INSPECTOR RghtsHop 3I 1 INSPECTION REQUEST PERMIT NUMBER OF PROJECT TOWN OF VAIL f Y r ' DATE .. I : JOB NAME ` E A.� - CALLER ' F READY FOR INSPECTION: MON: TUES WED THUR _ FRI AM , EM r LOCATION: 1 _ _ .� • } BUILDING: PLUMBING: ❑ FOOTINGS / STEEL ❑ UNDERGROUND ❑ FOUNDATION / STEEL ❑ ROUGH / D.W.V. ❑ FRAMING ❑ ROUGH / WATER ❑ ROOF & SHEER ❑ GAS PIPING PLYWOOD NAILING ❑ INSULATION ❑ POOL / H. TUB ❑ SHEETROCK NAIL ❑ ❑ ❑ ' FINAL ❑ FINAL ELECTRICAL: MECHANICAL: ❑ TEMP. POWER ❑ HEATING ❑ ROUGH ❑ EXHAUST HOODS ❑ CONDUIT ❑ SUPPLY AIR ❑ ❑ ❑ FINAL ❑ FINAL ❑ APPROVED ❑ DISAPPROVED REINSPECTION REQUIRED CORRECTIONS: : d 2.. zit//,��.�✓"..> ,„ '>:`.:'✓t�� 1 '.�'-°F - 2.4_... DATE / L f' INSPECTOR r = F 1SH_F INSPECTION REQUEST PERMIT NUMBER OF PROJECT TOWN OF VAIL DATE t 1 i JOB NAME ' ,i q� ' M GAER READY FOR INSPECTION: MON °T�a: V .ED THUR FRI AM PM LOCATION: BUILDING: PLUMBING: • FOOTINGS / STEEL ❑ UNDERGROUND ❑ FOUNDATION / STEEL ❑ ROUGH / D.W.V. • FRAMING I] ROUGH / WATER El ROOF & SHEER ❑ GAS PIPING PLYWOOD NAILING ❑ INSULATION ❑ POOL / H. TUB ❑ SHEETROCK NAIL ❑ ❑ ❑ 11NAL ❑ FINAL ELECTRICAL: MECHANICAL: ❑ TEMP. POWER ❑ HEATING ❑ ROUGH ❑ EXHAUST HOODS 0 CONDUIT ❑ SUPPLY AIR ❑ ❑ ❑ FINAL ❑ FINAL‘. - PROVED ❑ DISAPPROVED ❑ REINSPECTION REQUIRED CORRECTIONS: i/ , ' N DATE I' i iJ - INSPECTOR s .`.. �: :5�,, A _,� SHOP 4 �- bci INSPECTION REQUEST -- t TOWN OF VAIL PERMIT NUMBER OF PROM T 479-2138 DATE `J5 ` 1(C CIS JOB NAME "~-)6U` - LLER iM1r'I t=�'_11CC,I-'tt � ;v9 Gov (to.(?(i Od z(-76,- r f/,.. READY FOR INSPECTION: MON ( TUES�,I WED THUR FRIf ( M_}PM ! f �r LOCATION: 3 )L. C �t1�,,-- —i....¢'1 \-c---6:(6. pt c k_c. ( ( 'n;t ;( A t auv-)C MJ 1 C ', c BUILDING: PLUMBING: ❑ FOOTINGS / STEEL ❑ UNDERGROUND f 4 ❑ FOUNDATION / STEEL ❑ ROUGH / D.W.V. O FRAMING ❑ ROUGH / WATER ❑ ROOF & SHEER ❑ GAS PIPING PLYWOOD NAILING ❑ INSULATION ❑ POOL / H. TUB ❑ SHEETROCK NAIL ❑(c Lo ac---Lo) a ❑ FINAL ❑ FINAL (3\ELECTRICAL: MECHANICAL: O TEMP. POWER ❑ HEATING O ROUGH ❑ EXHAUST HOODS N O CONDUIT ❑ SUPPLY AIR O ❑ Z', Fl FINAL ❑ FINAL OCf. PROVED— 0 DISAPPROVED ❑ REINSPECTION REQUIRED = RRECTIONS: 1 DATE � INSPECTOR .l1 ':':// ,-.-! r --- ..'."'m 767 INSPECTION REQUEST /� ) -' �� ' /( TOWN OF VAIL PERMIT NUMBER OF P OJECT C 479-2138 ; / j r�, ti xF' r DATE d / JOB NAME � ��. r (--1 " CALLER < - :7 f ./ `:( ._ P-';. READY FOR INSPECTION: , MON .;:_..,TUES WED THU9. FRI� ,. _ (. AM ,' PM LOCATION: ,, r ; w ' _.' I / , ; ..z..,._ _ 'i ;" r::..-t= IA,f_ ". 1 , BUILDING: PLUMBING: ❑ FOOTINGS / STEEL ❑ UNDERGROUND O FOUNDATION / STEEL ❑ ROUGH / D.W.V. ❑ FRAMING ❑ ROUGH / WATER ROOF & SHEER ❑ GAS PIPING 0 PLYWOOD NAILING ❑ INSULATION ❑ POOL / H. TUB O SHEETROCK NAIL ❑ ❑ ❑ f° y• _.,-- FINAL .'° 7 -/_,-,=_y<._.. ❑ FINAL , ,. \ ELECTRICAL: MECHANICAL: O TEMP. POWER ❑ HEATING ❑ ROUGH ❑ EXHAUST HOODS 1---,, ❑ CONDUIT ❑ SUPPLY AIR O ❑ O FINAL ❑ FINAL ` ,. PROVED 0 DISAPPROVED ORRECTIONS: a: DATE 1 0 - i INSPECTOR . NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT SFR BUILD PERMITPermit #: B95-0127 Job Address: 5040 MAIN GORE PL Status. . . : ISSUED Location. . . : Applied. . : 05/19/1995 Parcel No. . : 2101-131-05-007 Issued. . . : 05/19/1995 Project No. : Expires . . : 11/15/1995 APPLICANT SORTLAND CONTRACTORS Phone: 3039494785 P 0 BOX 1168, AVON CO 81620 CONTRACTOR SORTLAND CONTRACTORS Phone: 3039494785 P 0 BOX 1168, AVON CO 81620 OWNER SAXE ANN 2015 HARBOR LINKS DR, LONG BOAT KEY 34228 ,�! Description: /, . --',5-- NEW NEW WINDOW -.--,-..-,-:, ) '& Occupancy: R1 Multi-Family / Type Construction: V 1-HR Type V 1-Hour Valuation: 1, 900 Add Sq Ft: Fireplace Information: Restricted: ArOf Gas Appliances: ilOf Gas Logs: #Of Wood/Pallet: *********A*AAA AAAAAAAA**AAAA*AAA*AAAAAAAAAAAA*AAA********** FEE SUMMARY AAAAAA*A*A**AAA**AA*****AAAA*AAAA*AAA*AA***AAAAAAA****AA*A Building-----> 62.00 Restuarant Plan Review--> .00 Total Calculated Fees---> 125.30 Plan Check---> 40.30 DRB Fee > 20.00 Additional Fees > .00 Investigation> .00 Recreation Fee > .00 Total Permit Fee- > 125.30 Will Call----> 3.00 Clean-Up Deposit, > .00 Payments ----> 125.30 TOTAL FEES > 125.30 BALANCE DUE > .00 Item: 05100 BUILDING DEPARTMENT Dept: BUILDING Division: 05/19/1995 DAN Action: APPR Item: 05400 PLANNING DEPARTMENT Dept : PLANNING Division: 05/19/1995 DAN Action: APPR Item: 05600 FIRE DEPARTMENT Dept: FIRE Division: 05/19/1995 DAN Action: APPR N/A Item: 05500 PUBLIC WORKS Dept: PUB WORK Division: 05/19/1995 DAN Action: APPR N/A See Page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information provided as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the Town's zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 4792138 OR A . R OFFICE " . 8:00 AM 5:00 PM s . Send Clean-Up Deposit To: SORTLAND NATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER • **************************************************************** TOWN OF VAIL, COLORADO Statemnt **************************************************************** Statemnt Number: REC-0022 Amount: 125. 30 05/22/95 09:38 Payment Method: CK Notation: Init: MMC Permit No: B95-0127 Type: A-BUILD ADD/ALT SFR BUILD PE Parcel No: 2101-131-05-007 Site Address : 5040 MAIN GORE PL Total Fees : 125 . 30 This Payment 125. 30 Total ALL Pmts: 125 . 30 Balance: . 00 **************************************************************** Account Code Description Amount 01 0000 41310 BUILDING PERMIT FEES 62 . 00 01 0000 41331 DESIGN REVIEW FEES 20 .00 01 0000 41332 PLAN CHECK FEES 40 . 30 01 0000 41336 WILL CALL INSPECTION FEE 3 .00 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT SFR BUILD PERMITPermit #: B95-0127 Job Address : 5040 MAIN GORE PL Status. . . : ISSUED Location. . . : Applied. . : 05/19/1995 Parcel No. . : 2101-131-05-007 Issued. . . : 05/19/1995 Project No. : Expires. . : 11/15/1995 APPLICANT SORTLAND CONTRACTORS Phone: 3039494785 P 0 BOX 1168, AVON CO 81620 CONTRACTOR SORTLAND CONTRACTORS Phone: 3039494785 P 0 BOX 1168, AVON CO 81620 OWNER SAXE ANN e, 2015 HARBOR LINKS DR, LONG BOAT KEY 34228 Description: •°� ,,E� ,4; NEW WINDOW • Occupancy: R1 Multi-Family Type Construction: V 1-HR Type V 1-Hour Valuation: 1, 900 Add Sq Ft: Fireplace Information: Restricted: NOf Gas Appliances: fl Of Gas Logs: Of Wood/Pallet: ****IkAAAA***A**AAAAAAA*A*AAAAAAAAAA*AA*A**AAAAAAAA*A**A*AAA FEE SUMMARY AA**A*AAAAAAAAAAAAAA*k****i**AAA*kAA*AAAAA**AAAAAAA*AAAAAA Building-----> 62.00 Restuarant Plan Review--> .00 Total Calculated Fees---> 125.30 Plan Check---> 40.30 . DRB Fee -> 20.00 Additional Fees--------> .00 Investigation> .00 Recreation Fee > .00 Total Permit Fee------> 125.30 Will Call----> 3.00 Clean-Up Deposit > .00 Payments ---> 125.30 TOTAL FEES > 125.30 BALANCE DUE -----> .00 Item: 05100 BUILDING DEPARTMENT Dept: BUILDING Division: . 05/19/1995 DAN Action: APPR Item: 05400 PLANNING DEPARTMENT Dept: PLANNING Division: 05/19/1995 DAN Action: APPR Item: 05600 FIRE DEPARTMENT Dept: FIRE Division: 05/19/1995 DAN Action: APPR N/A Item: 05500 PUBLIC WORKS Dept: PUB WORK Division: 05/19/1995 DAN Action: APPR N/A *AAA AAAA*AAAAAA*AA*AA*AAAAAAAAA**AAAAAAAAAAAAAAAAAAA* See Page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information provided as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the Town's zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 4792138 OR "Ai R OFFICE "• 8:00 AM 5:00 PM' . Send Clean-Up Deposit To: SORTLAND =OF OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER • NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT SFR BUILD PERMITPermit # : B95-0127 Job Address : 5040 MAIN GORE PL Status . . . : ISSUED Location. . . : Applied. . : 05/19/1995 Parcel No. . : 2101-131-05-007 Issued. . . : 05/19/1995 Project No. : Expires . . : 11/15/1995 APPLICANT SORTLAND CONTRACTORS Phone: 3039494785 P 0 BOX 1168, AVON CO 81620 CONTRACTOR SORTLAND CONTRACTORS Phone: 3039494785 P 0 BOX 1168, AVON CO 81620 OWNER SAXE ANN -,,,-'� , 2015 HARBOR LINKS DR, LONG BOAT KEY 34228 Description: NEW WINDOW - '- Occupancy: R1 Multi-Family Type Construction: V 1-HR Type V 1-Hour Valuation: 1, 900 Add Sq Ft: Fireplace Information: Restricted: I/Of Gas Appliances: I/Of Gas Logs: IOf Wood/Pallet: AAAAAA*AA*AA*AAAAAAAAA AAA*AAAAAAAAAAAAAAA*****AAA*A*AAAAAAA FEE SUMMARY *AAA**AAAAAAA*AA*A*AAAA*AAAAAkA*AAA**AAA****************** Building > 62.00 Restuarant Plan Review--> .00 Total Calculated Fees---> 125.30 Plan Check > 40.30 DRB Fee > 20.00 Additional Fees > .00 Investigation> .00 Recreation Fee > .00 Total Permit Fee- > 125.30 Will Call----> 3.00 Clean-Up Deposit > .00 Payments > 125.30 TOTAL FEES > 125.30 BALANCE DUE > .00 AAAAAA*AAAAAAAAAAA AAAA*AAAAAAAAAAAA AAA*AAAAAAAAAAAAAAAAAAA**AAAAA AA AAAAAAAAAAAAAAAAAA**AAAAAAAAAAAAAAAAAA*AAAAk*AAAAAAAAA*A*AAAAAA Item: 05100 BUILDING DEPARTMENT Dept: BUILDING Division: 05/19/1995 DAN Action: APPR Item: 05400 PLANNING DEPARTMENT Dept: PLANNING Division: 05/19/1995 DAN Action: APPR Item: 05600 FIRE DEPARTMENT Dept: FIRE Division: 05/19/1995 DAN Action: APPR N/A Item: 05500 PUBLIC WORKS Dept : PUB WORK Division: 05/19/1995 DAN Action: APPR N/A AAAAAkAAAAA*AAAA*AAAAAAAA***k*k AAAAAAAA*AA****************Ak*AA***A**k**A*AAA*WoW AAAA*A******A**********AAAAAA**AAAAAAAAA**AAAk See Page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information provided as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the Town's zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town (applicable thereto. REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479L2138 OR A • R OFFICE 8:00 AM 5:00 PM I Send Clean-Up Deposit To: SORTLAND GN3 ATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER Page 2 ******************************************************************************** CONDITIONS Permit # : B95-0127 as of 05/23/95 Status---: ISSUED ******************************************************************************** Permit Type: ADD/ALT SFR BUILD PERMIT Applied--: 05/19/1995 Applicant--: SORTLAND CONTRACTORS Issued---: 05/19/1995 3039494785 To Expire: 11/15/1995 Job Address : 5040 MAIN GORE PL Location---: Parcel No--: 2101-131-05-007 Description: NEW WINDOW ************************************** Conditions ****************************** 1 . 1 . SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AS PER SEC. 1210 OF THE 1991 UBC. 2 . FIELD INSPCECTIONS ARE REQUIRED TO CHECK FRO CODE COMPLIANCE. NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT SFR BUILD PERMITPermit # : B95-0127 Job Address : 5040 MAIN GORE PL Status . . . : ISSUED Location. . . : Applied. . : 05/19/1995 Parcel No . . : 2101-131-05-007 Issued. . . : 05/19/1995 Project No. : Expires . . : 11/15/1995 APPLICANT SORTLAND CONTRACTORS Phone: 3039494785 P 0 BOX 1168, AVON CO 81620 CONTRACTOR SORTLAND CONTRACTORS Phone: 3039494785 P 0 BOX 1168, AVON CO 81620 OWNER SAXE ANN 2015 HARBOR LINKS DR, LONG BOAT KEY 34228 Description: NEW WINDOW Occupancy: R1 Multi-Family Type Construction: V 1-HR Type V 1-Hour Valuation: 1, 900 Add Sq Ft: Fireplace Information: Restricted: #Of Gas Appliances: #Of Gas Logs: #Of Wood/Pallet: *AAAA*A*AA****AA*AAAAAAAA*AAAAAAAA*A* FEE SUMMARY **AAA**A**A**AAAA*AAAAAAAA****AAAA****A*AAAAAAAA**A*AAAAAA Building > 62.00 Restuarant Plan Review--> .00 Total Calculated Fees---> 125.30 Plan Check > 40.30 DRB Fee > 20.00 Additional Fees > .00 Investigation> .00 Recreation Fee > .00 Total Permit Fee > 125.30 Will Call----> 3.00 Clean-Up Deposit > .00 Payments > 125.30 TOTAL FEES > 125.30 BALANCE DUE > .00 AA*AAAAAAAAAA***A**AA AAAAAAAAAA****AAAAAAAAAAAAAAAA*AAAA***AAAAAAAAAAAAAAAAAAA*A*AAAA AAAAAAAkAAAAAAAAAAAA****Ai***AAAAA*A*AAAAAAAA Item: 05100 BUILDING DEPARTMENT Dept: BUILDING Division: 05/19/1995 DAN Action: APPR Item: 05400 PLANNING DEPARTMENT Dept: PLANNING Division: 05/19/1995 DAN Action: APPR Item: 05600 FIRE DEPARTMENT Dept: FIRE Division: 05/19/1995 DAN Action: APPR N/A Item: 05500 PUBLIC WORKS Dept: PUB WORK Division: 05/19/1995 DAN Action: APPR N/A AAAAAA*AAAAAAAAAAA******AAAA**AAAAAAAA** See Page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information provided as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the Town's zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 4792138 OR A•'R OFFICE"! 8:00 AM 5:00 PM 1 ' Send Clean-Up Deposit To: SORTLAND GNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER Page 2 ******************************************************************************** CONDITIONS Permit # : B95-0127 as of 05/23/95 Status---: ISSUED ******************************************************************************** Permit Type: ADD/ALT SFR BUILD PERMIT Applied--: 05/19/1995 Applicant--: SORTLAND CONTRACTORS Issued---: 05/19/1995 3039494785 To Expire: 11/15/1995 Job Address : 5040 MAIN GORE PL Location---: Parcel No--: 2101-131-05-007 Description: NEW WINDOW ************************************** Conditions ****************************** 1 . 1 . SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AS PER SEC. 1210 OF THE 1991 UBC. 2 . FIELD INSPCECTIONS ARE REQUIRED TO CHECK FRO CODE COMPLIANCE . viotteow NOTE : THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT SFR BUILD PERMIT Permit # : B95-0127 Job Address : 5040 MAIN GORE PL Status . . . : APPROVED Location. . . : Applied. . : 05/19/1995 Parcel No. . : Issued. . . : 05/19/1995 Expires . . : 11/15/1995 APPLICANT SORTLAND CONTRACTORS Phone: 3039494785 P 0 BOX 1168, AVON CO 81620 CONTRACTOR SORTLAND CONTRACTORS Phone: 3039494785 P 0 BOX 1168, AVON CO 81620 OWNER SAXE ANN 2015 HARBOR LINKS DR, LONG BOAT KEY 34228 Description: NEW WINDOW Town of Vail Adjusted Valuation: 1, 900 Fireplace Information: Restricted: #Of Gas Appliances: #Of Gas Logs: #Of Wood/Pallet: A**A********** FEE SUMMARY ********************** *** Building > 62.00 Restuarant Plan Review--> .00 Total Calculated Fees---> 125.30 Plan Check > 40.30 DRB Fee > 20.00 Additional Fees > .00 Investigation> .00 Recreation Fee > .00 Total Permit Fee > 125.30 Will Call----> 3.00 Clean-Up Deposit > .00 Payments > .00 TOTAL FEES > 125.30 BALANCE DUE > 125.30 AA**AAA AAA**A*AA*AAAA**kA ***** *********************AAAAAAA Item: 05100 BUILDING DEPARTMENT Dept: BUILDING Division: 05/19/1995 DAN Action: APPR Item: 05400 PLANNING DEPARTMENT Dept: PLANNING Division: 05/19/1995 DAN Action: APPR Item: 05600 FIRE DEPARTMENT Dept: FIRE Division: 05/19/1995 DAN Action: APPR N/A Item: 05500 PUBLIC WORKS Dept: PUB WORK Division: 05/19/1995 DAN Action: APPR N/A ***A*AAA**AAA AAA**********A*A*AA*A***********A********AAAAAAAAk* See Page 2 of this Document for any conditions that may apply to this permit. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information provided as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the Town's zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8:00 AM 5:00 PM Send Clean-Up Deposit To: SORTLAND SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER ******************************************************************************** CONDITIONS Permit # : B95-0127 as of 05/19/95 Status : APPROVED ******************************************************************************** Permit Type: ADD/ALT SFR BUILD PERMIT Applied: 05/19/1995 Applicant: SORTLAND CONTRACTORS Issued: 05/19/1995 3039494785 To Expire: 11/15/1995 Job Address : Location: Parcel No: 2101-131-05-007 Description: NEW WINDOW Conditions : 1 . 1 . SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AS PER SEC. 1210 OF THE 1991 UBC. 2 . FIELD INSPCECTIONS ARE REQUIRED TO CHECK FRO CODE COMPLIANCE. i '` TOWN OF VAIL CONSTRUCTION PERMIT # R• L ii ' 7, : .- ',- PERMIT APPLICATION, FORM DATE: f '.0 r..7, \----- APPLICATION MUST BE FILLED OUT COMPLETELY!ORS' IT M S Y° NQ'I` BE ACCEPTED ***************************** PERMIT INFORMATION ***************************** cJf� [ ]-Building [ ]-Plumbing [ ]-Electrical [ ]-M chap al ]-Other rrc) Job Name: SZ '� A cle �`tnj,,.d Job Address: •S-C6/"d-- , m -/41M 64/e(Q,/ /9• Legal Description: Lot Block Filing 1/ SUBDIVISION: Owners Name: ,�X)�' 4 -,.S - 2 Address: ;z/OJ /J ,P 9-u, 5';�'7�' e'- Ph. L^),,,7 G9 4- , F4 R . 3 2,2_8 Architect: Address: Ph. General Description: X 4 .i,R" tJ i Work Class: [ ] -New []'-Alteration [ ]-Additional [ ] -Repair [ ] -Other Number of Dwelling Units: Number of Accommodation Units: N�imber and Type of Fireplaces: Gas Appliances Gas Logs Wood/Pellet ********************************* VALUATIONS ********************************* S S 0121 BUILDING: $ 17C,'t ELECTRICAL: $ OTHER: $ PLUMBING: $ MECHANICAL: $ TOTAL: $ I g ******************* ******* CONTRACTOR INFORMATION *************************** eneral Contractor•. )/Q' "L, ; 6 £� /... k_ Town of Vail Reg. NO. 2570 Address: ge ((6 i i-A,(e) i°, CD. V/K ;;Lo Phone Number: _GVT Electrical Contractor: Town of Vail Reg. NO. Address: Phone Number: Plumbing Contractor: Town of Vail Reg. NO. Address: Phone Number: Mechanical Contractor: Town of Vail Reg. NO. Address: Phone Number: ******************************** FOR OFFICE USE ******************************* BUILDING PERMIT FEE: IP oc BUILDING PLAN CHECK FEE: 0 ,36 PLUMBING PERMIT FEE: PLUMBING PLAN CHECK FEE: MECHANICAL PERMIT FEE: MECHANICAL PLAN CHECK FEE: ELECTRICAL FEE: RECREATION FEE: OTHER TYPE OF FEE:L,tu cr+1i_ 3.cxc-' CLEAN-UP DEPOSIT: DRB FEE: ‘,/c, cc TOTAL PERMI FEES: TYPE GROUP SQ.FT. VALUATION BUILDING: `7 it L -1144 L -1 SIGNATURE:: ZONING: AMENINIPAWIPAPIIM _34— SIGNATURE: C ' ice ` Comments: CLEAN UP DEPOSIT REFUND TO: '-ra a '-� - e 1 -x-//b 6 min: , (. ;./42- MEMORANDUM TO: ALL CONTRACTORS FROM: TOWN OF VAIL PUBLIC WORKS DEPARTMENT DATE: MAY 9, 1994 RE: WHEN A "PUBLIC WAY PERMIT' IS REQUIRED Job Name: • Date: Please answer the following questionnaire regarding the need for a "Public Way Permit": YES NO 1) Is this a new residence? 2) Is demolition work being performed that requires the use of the right of way, easements or public property? 3) Is any utility work needed? 4) Is the driveway being repaved? 5) Is different access needed to site other than existing driveway? 6) Is any drainage work being done affecting the right of way, easements, • or public property? 7) Is a "Revocable Right Of Way Permit" required? 8) A. Is the right of way, easements or public property to be used for staging, parking or fencing? - B. If no to 8A, is a parking, staging or fencing plan required by Community Development? If you answered yes to any of these questions, a "Public Way Permit" must be obtained. "Public Way Permit" applications may be obtained at the Public Work's office or at Community Development. if you have any questions please call Charlie Davis, the Town of Vail Construction Inspector, at 479-2158. I have read and answered all the above questions. Job Name Contractor's Signature Date PUBLIC WORKS PERMIT PROCESS How it relates to Building Permits: 1) Fill out our check list provided with a building permit application. If yes was answered to any of the above questions then a "Public Way" is required. You can pick up an application at either Community Development, located at 75 S. Frontage Road or Public Works, located at 1309 Vail Valley Drive. 2) Notice sign offs for utility companies. All utilities must field verify (locate) respective utilities prior to signing application. Some utility companies require up to a 48 hour notice to schedule a locate. 3) A construction traffic control/staging plan must be prepared on a separate sheet of paper.An approved site plan may also be used. This plan will show locations of all traffic control devices(signs, cones, etc..) and the work zone, (area of Construction, Staging, etc..). This plan will expire on Oct. 15th. and will need to be resubmitted for approval through the winter. 4) Sketch of work being performed must be submitted indicating dimensions (length, width & depth of work). This may be drawn on the traffic control plan or a site plan for the job. 5) Submit completed application to the Public Works's office for review. If required, locates will be scheduled for the Town of Vail Electricians and Irrigation crew. The locates take place in the morning but, may require up to 48 hours to perform. 6) The Public Work's Construction Inspector will review the application and approve or disapprove the permit. You will be contacted as to the status and any that may needed. Most permits are released within 48 hours of being received, but please allow up to one week to process. 7) As soon as the permit is processed, a copy will be faxed to Community Development allowing the "Building Permit" to be released. Please do not confuse the "Public Way Permit" with a "Building Permit" to do work on a project itself. NOTE: * The above process is for work in a public way only. * Public Way Permits are valid only until November 15th. * A new Public Way Permit is required each year if work is not complete. cd/pway 1S110-1 TOWN OF VAIL 75 South Frontage Road Department of Community Development Vail, Colorado 81657 303-479-2138/479-2139 FAX 303-479-2452 INFORMATION NEEDED WHEN APPLYING FOR A MECHANICAL PERMIT 1 . HEAT LOSS CALCULATIONS. 2 . TO SCALE FLOOR PLAN OF MECHANICAL ROOM WITH EQUIPMENT DRAWN IN TO SCALE, WITH PHYSICAL DIMENSIONS AND BTU RATINGS OF ALL EQUIPMENT IN MECHANICAL ROOM. 3 . SHOW SIZE AND LOCATION OF COMBUSTION AIR DUCTS, FLUES, VENT CONNECTORS AND GAS LINES . 4 . NOTE WHETHER ELEVATOR EQUIPMENT WILL ALSO BE INSTALLED IN MECHANICAL ROOM. FAILURE TO PROVIDE THIS INFORMATION WILL DELAY YOUR PERMIT. l town of Vail 75 south frontage road office of community development veil,coloredo 81657 (303)479-2138 (303)479-2139 NOTICE TO CONTRACTORS/OWNER BUILDERS Effective June 20, 1991, the Town of Vail Building Department has developed the following procedures to ensure that new construction sites have adequately established proper drainage from building sites along and adjacent to Town of Vail roads or streets . The Town of Vail Public Works Department will be required to inspect and approve drainage adjacent to Town of Vail roads or streets and the installation of temporary or permanent culverts at access points from the road or street on to the construction site. Such approval must be obtained prior to any request for inspection by the Town of Vail Building Department for footings or temporary electrical or any other inspection . Please call 479-2160 to request an inspection from the Public Works Department . Allow a minimum of 24 hour notice . Also, the Town of Vail Public Works Department will be approving all final drainage and culvert installation with resulting road patching as necessary . Such approval must be obtained prior to Final Certificate of Occupancy issuance . OAp icy 1oll of v 75 south frontage road vail, colorado 81657 (303) 479-2138 or 479-2139 office of community development TO: ALL CONTRACTORS CURRENTLYL REGISTERED WITH THE TOWN OF VAIL FROM: TOWN OF VAIL PUBLIC WORKS/COMMUNITY DEVELOPMENT DATE: MARCH 16, 1988 SUBJECT: CONSTRUCTION PARKING & MATERIAL STORAGE In summary, Ordinance No. 6 states that it is unlawful for any person to litter, track or deposit any soil, rock, sand, debris or material, including trash dumpsters, portable toilets and workmen vehicles upon any street, sidewalk, alley or public place or any portion thereof. The right-of-way on all Town of Vail streets and roads is approximately 5 ft. off pavement. This ordinance will be strictly enforced by the Town of Vail Public Works Department. Persons found violating this ordinance will be given a 24 hour written notice to remove said material. In the event the person so notified does not comply with the notice within the 24 hour time specified, the Public Works Department will remove said material at the expense of person notified. The provisions of this ordinance shall not be applicable to construction, maintenance or repair projects of any street or alley or any utilities in the right-a-way. To review Ordinance No. 6 in full, please stop by the Town of Vail Building Department to obtain a copy. Thank you for your cooperation on this matter. Read and a knowledged by: X 40, -�� 4) eA R_.._ osition/Relationship to Project (i.e. contractor, owner) 5---c7-67 XDate 000 Aki towil of val 75 south frontage road vail, colorado 81657 (303) 479-2138 or 479-2139 office of community development BUILDING PERMIT ISSUANCE TIME FRAME If this permit requires a Town of Vail Fire Department Approval , Engineer's (Public Works) review and approval , a Planning Department review or Health Department review, and a review by the Building Department, the estimated time for a total review may take as long as three weeks. All commercial (large or small ) and all multi-family permits will have to follow the above mentioned maximum requirements . Residential and small projects should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned departments with regard to necessary review, these projects may also take the three week period. Every attempt will be made by this department to expedite this permit as. soon as possible. I, the undersigned, understand the plan check procedure and time frame. !1 _ r Ag _e ed to by Project Name Date Work sheet was turned into the Community Development Department. • - _. ___, . ' , _______ __ _____________ _ ____ _ __ __ _ ____ • ! . __________________ i • . I , ' . . . . . . . , . • .. , , . 1 ._ - i I f r---4-60"---4- R 1 f'''' et X86 -• i.. ,.... - i -' 4? 1 1 i ;1 1 ' , ,. 0 . • 1:2a.:: .a f;LID IA LEW ‘Yi r N 0:7W i 111 ' ; -1-e3 I -,. 4.,. tr(---) I Is-r.:)k_)1,-,NT iN Tq I iv\ !VT-, . - -- .-- •"1--,--1 . Mt..M\a,.\"T i 1.-...) ‘::.V. h`'\111-7" WA L L_ - \r---1,T.F.:: • 1.' • t ■ . • % •• i - , . . -, , --azusi,-t-r_. rviirt-1, - i'" .------- ------- -. '••., ' ' ---<'---.-- --..--.7':--'''''■-' Vi I r•j t:::1Q‘ri 7rQt tsA, L".."-- ....„,......■...;,.....,,...... • -,..........."-'•-■,..,......, ....., -....-, -, . • "--..., '°•,.....,....„:" -, • -.'-,,,‹T. - ...".4""\ --...„,-.,• ''' - '' '. , \ 1 ,,,..--'----''_... . _, .-- 1 ' , ..--- ......--- ___.,..0.. ...,.. ,.,....., ./.. , , „,--;-„, _,.,.."1.-- . „---- i -•-• „...„... ' ''' ••.. - ---....„.....-:kz......._ I -r.-+-, ------- ••''' - ..„-----:-.......„. •",1:'.. ..,, ''' '*'''■-■„, ,.' '•-■.,%,.,,.,,,,,,, ' .s..".'--,‘.....,,.., co 0 0•0 0 I I I I I 1..°°I.1.°.°°°..01,11 I I I I.-- -. - - ..,..--''''' '.:.,....''.'''''''': ,;'••'-' ___.........„/-. ,......,.,,,,......,- ..„....,f: ,,:, Dr.(CDNIT•:-Ow7.:A.:31.3 , ::,,,- ,...„.„..... ......--.4'., ":„...i , ...._, ...... , - ' • '• L.'S.)r5TINI.GP W IN 00\IV.5 ...," • "-• ^ ,,,,. ''''''Z'•'',-, • iii-f Vali Community 1 „------ ,,,--- _.....--- _____.<•• Wit‘ri)cAk OL - . ______--_,......_—_,...___________. .......----3,.„------ ....,... .,.....-..- ,....- __, _ „..,,,-- _,-- ...,,---- --..„,..----- ..„....--- - ...--.,„ -0 . _,...-- -,-- 0.0„,1' 10.0000"-- , il ----- ..e„...----- ■---- -----:- - > ..-j-'1 1 . - ---;- -,r-------:' -- ,c- T,, --',: ".------ 1,1- 1 \°proved .IP lied 0Plan 11;evelernMenttlealth 11 IV CI o Fire 0 7, ....,., ...„,„..--;;____----- ,,-.-.:- --...;,...;:,..„...„,,.--- : .... r ,-..-------:,- ..- - ,-- . -- , 1 - ki:iiditv of Permit .., _„,..- _ ...- --- ,,...-----..-- .----,,,,..- _.- - - _---- i Sec 13 (c) 19 U 8 C . ,„-- „.---- ,...- -H,_,---- ,,,---,,:_-_,.---- i -- __ , .1 ance or grantin! ot a permit or approval of plans an ,....e.:„..->-- „..„----- .. - 1 . -JiLations shall not te construed to be a permit for, or an ..„----...,-, i •:„,,:;•aval ot, any violatiin of any of the provisions of tnis code EF'ssZt.7.,1-11-44-„ ' -_ ..„,...------------. ,i )1. of any other ordinan,e of the juriscticalion. The issuance of '' ',--_,...--------1.----------- ,..- ---.,-------'-: WiNt,'";o,yry - ..-":"--; ----: •---,.....„-5-- i ci permit based upon pl.ns, specifications and other data shall „:„- ------ ...-- -:.-- ,,,,,..„.5.,,,,,- _ :....„....„---.1_,■,'„..,,, .........____________,„,..------ ----- ------- --- --- ' ' . lot prevent the 1)001, official from thereafter requiring the ,----'--:_f'----- ' • orrestien of errors in said plans, specifications and otter - ,,,,,___-__::,-,"-- „.---::,--;,....,- ,.. i -.2--1,,.. ,,,,„,--- f . , .. __„,_-__,-- .„ . y . ° Jata." -- ,,,....„,-..----- ....----- _________________.--- -1 -_,---- -•"-:,..<7. ---„,-;-;"- --.7'-7.--;2_,---- --7---, -',_,,,...,■,,,,,/--------- .,,..---":,:---- -, 1 a. )AT F- 5---/Y- , ......,..,-,::„.,.......„...>„„...... ____;...,,,,,._____________-_____ _...r „...„ ,.....„..,,..... .......„;.......„3:...„...„..„--., , S .i......... /...—er....„:„..„...............„„...„......---- ..„.„...,. --- ,..,..., ........7,:c.,--"- .7..7........,...-- ,......,,,,,,,,, ji . ---"" > - ..,.....„,...>........, ,,:......„...„„■:"-_„_.- _.,....- --,....--"'„...---- ..--" „....:d ;,- --- -"" ' t To of Vail i „7.-)1.3-nt-4(...6 wimr-A.-..„„iv.:7, ....- __________ 1 F1 E cOpy I r''' ', .„...... .- - I - - - - oF__ . L..... ___. - ri - E-7><-F. 7-..\,737 L - -.:11011vIN a-- iiDi;.07,2:tn---..lazD WIN Z.. ,e.., 1—,--X-4-1-'.:-..7-1 PP.0 DO S ED ALTEIZZATI OINI 5 l, I Il TO. - DvVELLI[NCT O l'AV_ZA INIIR5.54E 1 U ND Z.,,L. --TZ:YwN LION1E — UN IT A- 1 5040 M/A1N 0Q,E,DQ‘ VA I L. CO. • , 1 - g - 000 i ~\1 i. 0, 7 J I 1 • N., , t f=I7 tiEw viiN wr I 5-44 1 - I 1 10 I w I-- —i.. 6 i .Z.40•0'dd v.-Nil rae (.- r-z,7, := N''v ••� r L.0;... -1-1.� 1 ' 1 H1 i \` I WfNr.0W T[ZM `� \ �`--- \ , ---- ..----_/' - --,--.----: -----...„.. .,„.........,....._,_ . ,7„:„........ .....:::,..„_ _.. , __ _ ...., .. ........„:„-- ______---- _.,..-- 1 _ ..., _ ._ , ....„ , ___ ,..... ...:___;,..... .. ..>.___,..,„ ......,„ :..... ,......._ , ......_ ___ ,00011111,. ___,-- ... -------,..„---- .:. ... ....._ _..., , ___. ....._ , . _ ,, _ _ ___,. - ....,___ __. ____, , ,,--„,„_-- _. ._ ....._ ....._ ....., ....... ___ _ _ ,...., , _ _ ____ __ _ .._---t ..._., ____, NEW ✓'' �� f-7(.J1c�T1 far 1N1NtJOYV S —L._ ........_4%.�� /-" i i a y�o pue suo!1e 3i; ads 'su e!tl pies u! s J cn` � , oJI a o u01130 l x� : - /// �,/' _ - � 3141 6uunbaJ JalleaJaul 1104 o� !e13110 6u!oinq aq1 luanaJd 1 ,) mils elep Ault) pue suo!m!mads "sueld undn paseq 1!wJ ci P � ■ � '' / - f�f-,��� 3is poao use!unissdo l ue J o '.n l z!auu'l osI!:noo!a:;d eq a!opsl!paa n(.N e ii!e aauq aou!llEElu;a r f? !!n nts e yul'ta en eIu2E;o;Joa e scY o ale sued o IEno�rde JO 1!uc.Yi p n Iuuuel� JO eauenss, Kii ,�/-�� %/ 0 9 n 61 (a) EOE 59S J ' IW)ed In Al!p!!M.� „.----,,,,,,-44- f� 0 kr-_,1 pinuan i /// 0 u 0 panoxdut f t.- —.. �_________.----....--,.............-",5.....:-�., gJi3 43IEeH P' 9 ueld �`i' • =K. JJ / lueu,aalena0 �'� !,�/ - - �. f/ f // �.f: �',� bunullun7 Hen In limn". _ ___-../------"--'-- ---4--------„,„...-:„..,,„.---„,--;---- Ji _ka....„.01*_nts4(.4. wirer Z.', -.—.... FIELD Copy . _ _______ _ E.Q.- 'A,1 1. E)(.I "`Y- _ _ _ _--_ ____ _ - --- -- - �.� YL�. - Z":1-1::`>,_ v ,t'.'`r L7j �/ ati _ ) 5 t 4LT R -C"1 ri To DVVELLI1NG OP- 1\4' .4. MLA5 SAX E :1dci uNDt4�_ DwN aOME5 — Ur [ A- I 36 onr 5040 MAIN OtE. D . VA 1 L f,,,„ 5661 6 1VW I jrfi a , 1,., 44... , 111 diiii ''''))14) I c.-.C.).Pet D '3F.C.(4 IC 1.72-: Atx;.zz,94 Design heview Action Form TOWN OF VAIL Category Number 7 - I e 61/414/ Date 9 7-9,,/ Project Name: cfi }CGS Building Name: ((c i LA)11(?v <, Project Description: 14.--//1 3 E S j f;Ji t' 14,1 c-71- ?1,-'a Owner, Address and Phone: i---(}1.1 cOli/) 'V d i ? -3,),re k2(. d '! 1/L:. / Architect/Contact, Address and Phone: A/fdf Legal Description: Lot Block Subdivision -;i >'1G rG P AC°-1°'{ Zone District Project Street Address: 6i�' e �44'af�► ( 'P ;,0:2!. � 4" Comments: 1l6 61?aril f Board / Staff Action Motion by: Vote: Seconded by: ❑ Approval ❑ Disapproval YStaff Approval r Conditions: l fiLrf t `'f < e 7147�1 i{ a f t i U-r f. Town Planner Date: 7 DRB Fee Pre-paid 41(d0 /71 /c? SUNDIAL TOWNHOME ASSOCIATION, ,INC. 5040 MAIN GORE PLACE -B-4 VAIL, CO. 81657 (303) 476-5943-FAX 476-7379 August 24, 1994 Mr. & Mrs. Donald Saxe Sundial A-1 5040 Main Gore Place Vail, CO 81657 Dear Mr. Saxe: Upon review, the Sundial Townhomes Association, Inc. has approved your request to install a window in the east side of your home. This alteration is shown on your drawing by CO. P&D, dated August 23, 1994. Sincerely, Elmer G. Daniels President Sundial Townhome Assoc., Inc. revised 7/14/94 DESIGN REVIEW BOARD APPLICATION - TOWN OF VAIL, COLORADO, DATE RECEIVED: RECD UG 3 0 1994 DATE OF DRB MEETING: ********** INCOMPLETE APPLICATIONS MAY NOT BE SCHEDULED FOR REVIEW. ********** I . PROJECT INFORMATION:,�� ��, , 1� A. DESCRIPTION: /r--�- a(-1C d'�f 60//"-U -e-4, B . TYPE OF REVIEW: New Construction ($200 . 00) Minor Alteration ($20 . 00) Addition ($50 . 00) Conceptual Review ($0) C. ADDRESS : 3-0 qc)-- /���� �/ '�� r / D. LEGAL DESCRIPTION: Lot Block -� 1 Subdivision JO(AL If property is described by a meets and bounds legal description, please provide on a separate sheet and attach to this application. E. ZONING: F. NAME OF APPLICANT: 10A mailing Address : _S-OL(0 -' cc-r,• /. . ' - i4(4ci ee e-e /(5) Phone G. NAME OF APPLICANT' S REPRESENT IVE: Z )� Mailing Address : :_. //6 ..1. Ilt / . Phone 6 ^0Y67 H. NAME OF OWNER (S) : ® - v ! `._ f OWNER (S) SIGNATURE: �� ` �� ,/ ;. Mailing Address : Phone APPLICATIONS WILL NOT BE PROCESSED WITHOUT OWNER'S SIGNATURE I . Condominium Approval if applicable. J. DRB FEE: DRB fees, as shown above, are to be paid at the time of submittal of the DRB application. Later, when applying for a building permit, please identify the accurate valuation of the proposal . The Town of Vail will adjust the fee according to the table below, to ensure the correct fee is paid. FEE PAID: $ CHECK #: DATE:8/`' l9`+BY: 9\) FEE SCHEDULE : VALUATION FEE $ 0 - $ 10, 000 $ 20 . 00 $ 10, 001 - $ 50, 000 $ 50 . 00 $ 50, 001 - $ 150, 000 $100 . 00 $150, 001 - $ 500, 000 $200 . 00 $500 , 001 - $1, 000 , 000 $400 .00 $ Over $1, 000, 000 $5,00A0- DESIGN REVIEW BOARD APPROVAL EXPIRES ONEI&FrAR AFTER FINAL ; APPROVAL UNLESS A BUILDING PERMIT IS ISS D AND CONSTRUCTI, IS STARTED. A 6 u u 9 ,. fivim 1-1/ t 1 LIST OF MATERIALS NAME OF PROJECT: i Z Y °C�ee - ,C) LEGAL DESCRIPTION: LOT BLOCK SUBDIVISION STREET ADDRESS : ...3-0110— �N � O/. 4 The following information is required for submittal to the Design Review Board before a final approval can be given: A. BUILDING MATERIALS : TYPE OF MATERIAL COLOR {J r c Roof PO ' H ) -L J,1 Siding AUU u 0 -24 !i\ <<=.' ifi"1 ' ir Other Wall Materials Fascia Soffits Windows /00-4 / '4 ce Window Trim Doors Door Trim Hand or Deck Rails Flues Flashings Chimneys Trash Enclosures Greenhouses Retaining Walls Exterior Lighting Other B. LANDSCAPING: Name of Designer: Phone: 7 PLANT M, _ERIALS : Botanical Name Common Name Quantity Size* PROPOSED TREES AND SHRUBS • • *Indicate caliper for deciduous trees . Minimum caliper for deciduous trees is 2 inches . Indicate height for coniferous trees . Minimum height for coniferous trees is 6 'feet . **Indicate size of proposed shrubs . Minimum size of shrubs is 5 gallon. Type Square Footage GROUND COVERS SOD SEED TYPE OF IRRIGATION TYPE OR METHOD OF EROSION CONTROL C . LANDSCAPE LIGHTING: If exterior lighting is proposed, please show the number of fixtures and locations on a separate lighting plan. Identify each fixture from the lighting plan in the space below and provide the height above grade, type of light proposed, lumen output, luminous area and a cut sheet of the light fixture. (Section 18 . 54 . 050 J) D. OTHER LANDSCAPE FEATURES (retaining walls, fences , swimming pools, etc . ) Please specify. Indicate heights of retaining walls . Maximum height of walls within the front setback is 3 ' . Maximum height of walls elsewhere on the property is 6 ' . 8 •-----4-.--...■-■....-....._....__........ ..,--..- ; 4. ------.6-4 1 , ,1- LI r I o ',..-1? 1 t ' 1 17 t . 1 131:ZCE.1:) NEW WIN OC:W 1.1.--1- 3AN'T FS... "TWIN .2,4 Ri M_ , 'WI , r , i __ ___ ___ ...L.... -- — - — - -- - ,1.4 " I I , a L.- \itZt i(Z71-.4 ,. F eAltr:"" WAI.L.,— vt-4 retzucx-- , -.• % 44 ktN4G int2.01 —C) *11`.1Ccs•t-4 1...C .CaCrIC:m--4 t I ? , .- . _ ,..------- ----...> --7;1/44%-11:=. './73."...,71N -__,.„2.--------i-----, ---.. --"" . ----,-->'-' -----------...."----- .. •W i NIZ),- ,\N M, - _.---- ' 4: "--,-..,...... ..,_.. ,____ <:Z..„,-................ -- ,------ - i 1 _ ------'- -.--------------..---------- _ - ''''''''''''''.°-■_,„.. ..,_ ---- , -_ -., ■ ___....--- ..„,...-- ---„,„ ------- ---- , - -- _„----• -_ ---------..._ ,...„,,,,,,,,,, _,.., ..,_,,,,, ,,,,,,,,,_.. .....,, ........._,...:,::, _.------- ---,:;------;,„--- _--- ...- __.,---f--- --, ■ -'-' . CC4C-31-WrZiF...r.) .-- . ,..., ,..„,100., ; --'"-- 1 1..,--'-' .,„... ,..,.... .---- ,..., )EW *....' "..-.— "'-'..1 - -. --' T^-1-___ _-31::Tir' ra WIN DoNN...5 ....-- , ! ____.--. _ ____________ ,__ _--- N i N170\64 011_ f(1- .- - ;.....3„- - ---- --<:" ' .---- --- I I gr'----- ____________ _/ ....__ _______________„„ __ ____ ___----------)---- ,---:--! ,.— ,,, ..--='--- - ,.;i----‘- -----. 5-: - -- - 1--- '",< ' - ,---- --- __ ---- ..----- - - -/ ,....------_,--- ,- ,-----. ---(' 1 ,---;,' ,.---------- ._,.:-.----"5. --. ------'<"----- --"--' Fz '. -1-4. - „,.....---- --' t.....,„) 1 ,...29, .,,,,,.,...-• ,....„......- NIZXWV __:•;„:".. __, •_,-..::••*- . , „,,,r` _.>...,....„:„.„.„..........;.„ .......,„„/"..- ..........‹...„,;.,,,.,..........i,.....':„..,,,„:„..,-...-' . 4 1:4t I ___ .-- .........___________„.„.....„ ____,..-/-------;---,i--*-1 ,--- ,-:;-- . $ 4, , , _ AUB ,, 3 i94 I '- - _---- „„------,----- _,.-___..--!--..--1.„----_,,----”' ,,,--0"- „,-- " se.■.-..Y:- ....": „..---- ..,..„. _.,,....--" ..----- ...---. ..-.1"-.--""„,".>"--' -"-- .....„....-"."-; ,,,,.,..•,..■'''''''''''..';' V ■ . . . H L ,__,,--•-'' '-,,- -"--:--''''', ,,'',':,'-‘-'-_,',''''',,--'.■<:>:'"'' , -' '' -,- _-- NiviINIZA,.. , _,... i 4 i k. k• , ,, , L ,.. ..--....,................Ope 1 _ = -- , ,-r-I , r..4 — E-,xi- . --.A\.1/4-n- .\,,w\LL - znj, v,,/i:-4G. C,r."..,i-oz) 'NW Dr''' '61 PPO DO5 ED LTEATION5 TO DWELLING OP- Mk1 .4. INTI5 54')<E a.)ND1Q L 7?-)V v N 癀െ U N I T , 5040 m AIN c-1-0QE_ D: vA!i L QC). 1 . , 1 _ c.--.O.P4 D ZED'i K--L 4L : $4 ____ _.,... ,.._ Natl_________ _ .,„..„ . . „._ -P. 15105 PccourIT. CK . DON SPXE\PREPPID DRB . Ttem p-eid peid 20,00 RECEIPT— The Town of DATE 19 ' RECEIVED FROM • .-- , . . . ADDRESS " • - . . ---IDOLLARS $ . , . . Permit Numbers Police Receipt Numbers HOW PAID—Cash Check By •.4;ti}':::.i:•i:::{:•i ::^:::::•igiu;•:::.i'{•i:ii:•i'•i:•i vvi:•i+:{•?i':z:::�;::v.v:.v: :::{{{: v•...n.....v,... vxv....v.n...:.....•...'• ..:}i:::i:...,,.vn.. ..vhv,•.vn{•yi.•'�i�r£::'t't• vviSSii::a:''.•';:'•i i•::::Li:4•.}v.}w::.}i vn;::tiff:"•i••iiii•iJi:•:'•iiY•i:•iii i'•i'•i'?:;;:.i w:.i :.,•;••v {{{:::::,J.•:::n...w;.•.x; :•:rn:: :::v.xv..:... ...... .......:.{:tn;.,v,.v;{:::::... • .v............................ ..........,....v.xv......v......v.v.....:.n..v..., v.........,•::::n,+•.•,•.v::n .x;:;.{{••:. •.v::nvv.v:.::::::.ti•.i.}i;.x•.•.•.....v.v}: .:: :::•nn.....v...•,:::...v.,.,....•..•.titii:viivv.v:•;v.:...:.;....., w / 9 , { TOWN OF VAIL RECEIPT NO. 40�" l DEPARTMENT OF COMMUNITY DEVELOPMENT NAME C 07 "7 Q . (---C,__,J it. 100 �� r � ) (� ADDRESS c�!ltrl J CIDAAAL-tr ) .J`T a O DATE 8 1 B ,`"! PROJECT a. � 1 l/� �V� CHECKS MADE PAYABLE TO TOWN OF VAIL :'•' ACCOUNT NO. ITEM NO TAX. COST EA: TOTAL- ti 010000 41540 ZONING AND ADDRESS MAPS $5.00 * . *`• 010000 42415 - UNIFORM BUILDING CODE $50.00 * iiiS • 010000 42415 UNIFORM PLUMBING CODE • $36.00 << 010000 42415 UNIFORM MECHANICAL CODE $32.00 iit 010000 42415 UNIFORM FIRE CODE $36.00 * • 010000 42415 NATIONAL ELECTRICAL CODE $30.00 010000 42415 OTHER CODE BOOKS * 010000 41548 BLUE PRINTS(MYLARS) $7.00 010000 42412 XEROX COPIES $0.25 * .f.� 010000 42412 STUDIES 010000 42412 TOVFEES COMPUTER PROGRAM $5.00 010000 42371 PENALTY FEES/RE-INSPECTIONS 010000 41332 PLAN REVIEW RE-CHECK FEE [$40 PER HR.] 01 0000 42332 OFF HOURS INSPECTION FEES 010000 41412 CONTRACTORS LICENSES FEES gil 010000 41413 SIGN APPLICATION FEE $20.00 °' iii 010000 41413 ADDITIONAL SIGNAGE FEE [$1.00 PER SQ.FT.] 010000 42440 VTC ART PROJECT DONATION il•••••• Siii 010000 41331 PRE PAID DESIGN REVIEW BOARD FEE 2D 010000 42371 INVESTIGATION FEE(BUILDING) { 310000 45110 TOV PARKING FUND . iii 010000 22027 TOV NEWSPAPER DISPENSER FUND `" ;; *010000 21112 TAXABLE @ 4% (STATE) • -'::: *010000 41010 TAXABLE @ 4% (TOWN) 010000 42371 BUILDING INVESTIGATION . • OTHER ... PEC APPLICATION FEES` 010000 41330 ADDITIONAL GRFA "250" $200.00 Ili 010000 41330 CONDITIONAL USE PERMIT $200.00 `010000 41330' 0EXTERIOR ALTERATION [LESS THAN 100 SQ.FT.1 $200.00 010000 41330 EXTERIOR ALTERATION [MORE THAN 100 SQ.FT.1 $500.00 01 0000 41330" SPECIAL DEVELOPMENT DISTRICT [NEW] $1,500.00 010000 41330 SPECIAL DEVELOPMENT DISTRICT [MAJOR AMEND] $1,000.00 01 0000 41330 SPECIAL DEVELOPMENT DISTRICT [MINOR AMEND] $200.00 010000 41330 SUBDIVISION :.i` 010000 41330 VARIANCE $250.00 01`0000 41330 ZONING CODE AMENDMENTS $250.00 01 0000 41330 RE-ZONING $200.00 .` OTHER 1.1 OTHER iii TOTAL: `)_0 • i{ iiiiii COMMENTS: , i, iliiii !] .iiiii CASH 1 I CK.#[' 1 ca- 3 DATE: 8/ 9 - REC.BY c J' 1 v November 12, 1992 Mr. and Mrs. J. Hickey Sundial Condominiums, Unit Al 504M/fain Gore Place Vail, CO Dear Mr. and Mrs. Hickey: The board of directors of the Sundial Townhome Association developed policies on basement modifications in the summer of 1992. Generally, the board requires assurance of an operable access window, appropriate weather resistant materials and acceptance of full liability by the unit owner. I have reviewed the drawings and letter submitted on the second of November describing your plans for basement improvements at unit Al. The engineering drawings address the issues expressed by the board. This letter serves as notification that I have approved this installation as proposed as being in accordance with board policies. You may use this letter in assuring the Town of Vail that you have received Homeowner Association approval based on your specifications, dated October 22, 1992. As mentioned previously, by proceeding with this construction you relieve the Homeowners' Association of any obligation to repair or maintain the affected walls, your installations, the windows and the window wells. These improvements are the responsibility of the owner of unit AI and not an Association obligation. Further, any damage to the building complex that is caused in whole or in part as a result of this modification will be the sole responsibility of the unit owner. It would be appreciated if you would give a copy of your drawings to Slifer Management for Association records. Thanks for working with the board. I hope your renovation goes well. d 51749_ Very truly yours, ,\*K } f, ti Ford C. Frick -.49tpill,,,(0(i 6 s..Q*/Q1j - President Cejk $ 10, 001 - $ 50, 000 $ 50 . 00 $ 50, 001 - $ 150, 000 $100 . 00 $150, 001 $ 500, 000 $200 . 00 $500, 001 - $1, 000, 000 $400 . 00 $ Over $1, 000, 000 $500 . 00 * DESIGN REVIEW BOARn npflflntn+T Z,VTT.ww 5040 Main Gore Road East Vail Colorado Unit A-1 Sundial Condos Design Review Application-Request Description by Douglas E Myers July 1 , 1998 / 1. Item 1 Expand the South facing Window in the Loft area one foot down to the level of the smaller window to the east. Photo (item 1 ) is taken of the South side of the structure from the South West corner. 2. Item 2: Add a 5-0 by 4-0 window to the master bedroom on the south wall apppx 6 feet west of the east wall. Photo (item 2) is taken of the South Wall of the structure from the South East corner. 3. Item 3: Add a stroage compartment, with exterior access, on the SE wall above the deck area between the existing storage door and exit door. Doors of the storage compartment to be made of existing siding. Photo (tiem 3) taken facing SE over the balcony. icarn VaL nrcipc rbt0Q-%7 ,;(51 I,..r...7.2-,,,,, '.... ./ • -- , „ .., .. . .... . ,. ,,„ , ,_...,,,,,,,,,,,,,,,,,,,,,,,,.,,„., , ... ,..;;„_;.1.•,••.,,,x.-"'"--...'0'.,-1,..M-.4'1:::::.1.'-.4-,:.•-:::-,-,,,i'-',31E"-• '''''-"--' ' 1 .-,,i?,,',:----, ,r;r7;-'.:'''''"''''''''','-',--.--• '''''''` 44'."'''''''Z'''"''''"'''' a---7&''' 1 440ir . ,... ....,,,,..„:„.„.„, \,,'.,:..,,.\ ---'..kt,i14.::-.,.!.-..., !------... . . r,.,--- • . . , . , .. , ,. .:,',.'.. s- , -,,,,...e.,.,-,..,,...4-1 :7.:71', _. - 4b.,;.;:-.-,.. .'. .:2•- - :. ' - . , „..„. ..., _. . 1 ----, ------ --;— - ' - -• - ... . . , .... ......„ . ......-- ... ., .. .....-... - .,,.... .,...;.. ----..."--- 1 : . .. . - . .. , _.,... ....... . .. . .. .. .,4 , . ..„. .. ' - i'''' ,. . . . .. ... , -,.. , . , .... :.,. . , •.... . . . „. : ...,....--, . . , I\ ... -... ...., • - . ` --,-, -. —,-. . ... .....„ 1-,-;,,,..,:2-_,...- . .. . .„... . . ,-,,,:' - ,•..!--.,..i...., ' . . . - . . .....,. . ....._ . - 1 .-- - I:, - ' • •:::-',1 '-- :ij \I . ..: ::::, :. •-, • .., ir I ,srsi•i,„' ,' • t' ' 4' .. . %. ''';'i - : ' — • Ht. l',44, 1 ',•- ' i -•-•.-f4...i.,, ,• %*eittt,■'- . , ...,. 1 ' .• 1 . . ' '1.`' 4444titt'.6%.- ,. • , '-. • 1.• • ,.... ..., , ......, , '..-.1: i I. ' '' . - •-:•'-1*''''' ' . .,. — ' .• . . ...,........ . - 7.............„,-...--,, ..„....-...,..,.., .,....,..„..-•:. ......: - .. ; , , . ,..:,,,,..,...... .,,z„,:,;....5.45i.kYlitiii:g4k ;-'''-''''- ' ef ' ' :-;.-.'"'`.7„.,7::.:7: . ''.r.', 1.. .'' '::: ' ..::?i•-...','-:;;.44i ..,''...:arititt,S41°''''''' / ., " , /s , 2-76Th A. _ . ....,1*!:.' , ,' - „i„,..,,,,,,:::.:,•,.„-;;;;;;,„w;:,,,IR, 2,7,-- —44\ _ ..:„.,.....__._. –-...--,- vtifir ... ,,zi,,,7-,'--',=:-.:,:-.:..,4,:, -r.,-',„•,;-:,•-;,,i-..„.".'''.,,',':•;':'",;,:.;,,,c'!:::: '''''' . ,..\.■„ Nigi,-t.,,,v,,,,,,,,,,,-,,- • . --- ' ' - ''--- I':,.:,-.\::".- ..\14,4"iliiiiii'i-,,,e'-'"''''''''''' ' ----- ------ . •, . 3-,... .,„ '-'1i'N''..;:.• — ' . . .. .--„'.....,-..........- , ■1 ',, ,, , . ... ' ,... — „ •., .,. , ...., • , s4 W. . 4• I . . ..,,, e ., .. ..• ...III ,,,, ... • i „ . ' . , .__ .1...... ...,;.,.......,.......1 . i., ,,,.• e \ , ,■. „ ' . . , r . .., .... , -7 1 . ' 7 •-•;• ' - 7 ". Ili la 1 iv . k '•,..- - ; . ' . .•.• ' # t '4*. . _ 1, i .1 '''' 1 . • ''''' ..:,•• ,,,.... _............,,ast L3 '..,;,-.;4-',11*,'W • • L Sj , t4t, Ito .. 'r' a. t i V.'.'. �'�'�, °._ •'^a•s ii .:14-.1-1e0.--%-' 41;; s•: 3 f '- f i I firL , •f a� , r. ,S► , m1`I�a" . ' .14.4.1•'-`s1/2/.. :=. ! S vi, R,.. ~ ..,.c IR . ;,;h- 1 Stc,'`. -4A--, ` .( L .y •Obi. 48ft, { < • y: i to �d eDY t r x'4,9+ 7 Ri.. 1 s e n e 1.-e r Y r$1 :,k`` _ ..Ate.,,,.-f 3 .� j 1, 40:- .tea' sr� _ j .x' - SJ,' ICI -"� 1 it 4r fa, •> . '' "i+ �% 7 11 •• P t '�° �. �,4rt' 4t`y, r } rx%; f: r et t r � t:/,. .;.i.,!..a.t, , l �+:.„..:f.:., :.., .: 0,, ..., i:i „... ,/,...„,:z.,..1,1e,,nrit , ...---'4.: 1 Itip S t- 4j '. , Y I ' . '4 Q'A, .• , a^ � S J F = r ` :'.� ` ....,,,,.• • i*� a�T'' yi 44' �if f►w + ew. ✓ -!J , k ,' A►.'N L '< v•.. e tN r i- i^1 ,f * �4 4 ) • ,{ ?�7 Yt.-.r .a , sy✓yam+ �' .. v`tyE , N-yL • +r. y whi. jiff n �. r� .l t. it'l .` i ` "? Sr — ..., IF II I'.7 i ... .#lrwK... 1 t Yf , ��'.e.y♦K .;ham? t = • • w . f b . ^ `. O. r s P �/ - 1. . ill ��: eaQx- 3 `` his r5 4 • _ _ ::f -"''' lit' ■ A a, L . r 'll lit .4 ' 4 ''''''''''''..''''- -'I , . r' ,,_,::::;,,,,,,,,4L'T:.k.,:f4';::;:,_-1_:::::;:::.;:=42,2.:,, „:,..,.-Iii M.Y ^. A • f .la+ -�,I,.4. �R n.: !Y. y .7 t� ..46.;`h►1Llifi.'.rLVihAM it. f., .- • ♦ ■ 'P�a.`1 . Design Review Action Form TOl4 'OFYAIL TOWN OF VAIL Project Name: Myers Residence Project Description: Window and storage compartment additions Owner, Address and Phone: Douglas Myers, 1525 Spruce #101, Boulder, CO, (303) 442-2682 Architect/Contact, Address and Phone: same Project Street Address: 5040 Main Gore#A-1, Sundial Townhomes Legal Description: Sundial #A-1 Parcel Number: Building Name: Comments: Board / Staff Action Motion by: Action: staff approved Seconded by: Vote: Conditions: Town Planner: Brent Wilson Date: 9/28/98 DRB Fee Pre-Paid: $20.00 F:AGVFRYONE\DRB\APPROVAL198'vnvers.wpd Questi ? Call the Planning Staff at 479-2128 APPLICATION FOR DESIGN REVIEW APPROVAL TOWN OF VAIL g GENERAL INFORMATION This application is for any project requiring Design Review approval. Any project requiring design review must receive Design Review approval prior to submitting for a building permit. For specific information,see the submittal requirements for the particular approval that is requested. The application cannot be accepted until all the required information is submitted. The project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission. Design Review Board approval expires one year after final approval unless a building permit is issued and construction is started. / A. DESCRIPTION OF THE REQUEST: % S (' 3 cu € i. 41)77.0 A C(J L-0 P c.u s A r Eis/T5 FD 2 ca s /l b'A07 Q SO0 i (-1 S t Ui 8 F TR LO/c 6 B. LOCATION OF PROPOSAL: LOT: A - I BLOCK: FILING: 5,"10/,ro L PHYSICAL ADDRESS:-50 Ya /hb,1,1 �'cQL� -#A -- / EA57 (A)! t C. PARCEL#: 2 6 I - 12/ - v�o — ° (Contactt Eagle Co.Assessors Office at 970-328-8640 for parcel #) D. ZONING: E. NAME OF OWNER(S): 4_43s MAILING ADDRESS: /3 25 SPde cC& , V o /01 B 0ULi7 P..A,.. PHONE:3O3 ' (11Z-2482 F. OWNER(S)SIGNATURE(S): is G. NAME OF APPLICANT: ,31::)/1—)14. MAILING ADDRESS: PHONE: H. TYPE OF REVIEW AND FEE: ❑ New Construction-$200 Construction of a new building. ❑ Addition- $50 Includes any addition where square footage is added to any residential or commercial building. XMinor Alteration - $20 Includes minor changes to buildings and site improvements,such as, reroofing,painting,window additions,tandscaping,fences and retaining walls, etc. DRB fees are to be paid at the time of submittal. Later,when applying for a building permit,please identify the accurate valuation of the project. The Town of Vail will adjust the fee according to the project valuation. PLEASE SUBMIT THIS APPLICATION,ALL SUBMITTAL REQUIREMENTS AND THE FEE TO THE DEPARTMENT OF COMMUNITY DEVELOPMENT,75 SOUTH FRONTAGE ROAD, VAIL,COLORADO 81657. For Office'Use Only Fee Paid: CK#: By: Application Date: • DRB Meeting Date: Pre-Application Meeting Date: • LIST OF PROPOSED MATERIALS • • BUILDING MATERIALS: • TYPE OF MATERIAL: COLOR:* Roof • • Siding Other Wall Materials Fascia • Soffits A��yy Windows '4r,l v,o /?Z.,J L 7 0 kA./A) Window Trim Doors • Door Trim Hand or Deck Rails Flues Flashings • Chimneys- Trash Enclosures Green houses Retaining Walls Exterior Lighting** Other • * Please specify the manufacturer's color,number and attach a small color chip ** All exterior lighting must meet the Town's Lighting Ordinance 18.54.050(J). If exterior lighting is proposed, please indicate the number of fixtures and locations on a separate lighting plan. Identify each fixture type and provide the height above grade,lumens output, luminous area,and attach a cut sheet of the lighting fixtures. 2 • Updated 6/97 PROPOSED LANDSCAPING Botanical Name Common Name Quantity Size* PROPOSED TREES AND SHRUBS: • • .. . . / • EXISTING TREES TO BE REMOVED: *Minimum rcqui• ments for landscaping: deciduous trees -2 inch caliper coniferous trees-6 feet in height shrubs - 5 gallons T Square Footage GROUND.COVER ' / - . SOD / SEED / / IRRIGATION TYPE OR METHOD F EROSION CONTRO OTHER LANDSCAI E FEATURES(retainingwalls,•fenccs,swimming pools,etc.) Please specify. Indicate top and bottom elevations of/retaining walls. Maximum height of walls within the front setback is 3 feet. Maximum height of walls elsewhere on tJe property is 6 feet. 3 • Updated 6/97 4111111%. MINOR ALTERATIONS TO THE.EXTERIOR OF BUILDINGS " )WN OF VAIL r AND SITE IMPROVEMENTS - GENERAL INFORMATION This application applies to changes made to a site or exterior alterations of a building. Any alteration in which additional building square footage is added will require an"additions"application. I. SUBMITTAL REQUIREMENTS ❑ Photos or sketches which clearly convey the existing conditions. ❑ Photos or sketches which clearly convey the proposed building or site alteration(s). ❑ All relevant specifications for the proposal including colors and materials to be used. ❑ Condominium Association approval (if applicable). ❑ If the intent of the proposal is not clearly indicated,the Administrator may determine that additional materials are necessary for the review of the application. j. STAFF APPROVAL The Administrator may review and approve Design Review applications,approve with certain modifications, deny the application,or may refer the application to the Design Review Board for decision. All staff • approvals are subject to final approval by the DRB. The following types of Design Review applications may be staff approved: A. • Any application for an addition to an existing building that is consistent with the architectural design, materials and colors of the building, and approval has been received by an authorized member of a condominium association, if applicable: • B. Any application to modify an existing building that does not significantly change the existing planes of the building and is generally consistent with the architectural design,materials and colors of the building.including,but not limited to exterior building finish materials(e.g.stonework, siding, roof • materials,paint or stain,), exterior lighting,canopies or awnings,fences,antennas,satellite dishes, windows,skylights,siding,minor commercial facade improvements,and other similar modifications; C. Any application for site improvements or modifications including,but not limited to, driveway modifications,site grading.site walls,removal or modifications to existing landscaping,installation of accessory structures or recreational facilities. VI. ADDITIONAL REVIEW AND FEES A. If this application requires a separate review by any local,state or Federal agency other than the • Town of Vail.the application fee shall be increased by$200.00. Examples of such review,may include, but are not limited to: Colorado Department of Highway Access Permits,Army Corps of Engineers 404, etc. B. The applicant shall be responsible for paying any publishing fees which are in excess of 50% of the application fcc. If,at the applicant's request.any matter is postponed for hearing,causing the matter to be re-published,then the entire fcc for such re-publication shall be paid by the applicant. C. Applications deemed by the Community Development Department to have design, land use or other • issues which may have a significant impact on the community may require review by consultants in addition.to Town staff. Should a determination be made by the Town staff that an outside consultant is needed.the Community Development Department may hire the consultant. The Department shall estimate the amount of money necessary to pay the consultant and this amount shall be forwarded to the Town by the applicant at the time of filing an application. Expenses incurred by the Town in excess of the amount forwarded by the application shall be paid to the Town by the applicant within 30 days of notification by the Town. Any excess funds will be returned to the applicant upon review completion. • 6 Updated 6/97 5040 Main Gore Road East Vail Colorado Unit A-1 Sundial Condos Design Review Application-Request Description by Douglas E Myers July 1 , 1998 1 . Item 1 : Expand the South facing Window in the Loft area one foot down to the level of the smaller window to the east. Photo (item 1 ) is taken of the South side of the structure from the South West corner. 2. Item 2: Add a 5-0 by 4-0 window to the master bedroom on the south wall apppx 6 feet west of the east wall. Photo (item 2) is taken of the South Wall of the structure from the South East corner. 3. Item 3: Add a stroage compartment, with exterior access, on the SE wall above the deck area between the existing storage door and exit door. Doors of the storage compartment to be made of existing siding. Photo (tiem 3) taken facing SE over the balcony. ° Ques s? Call the Planning Staff at 479-2128 APPLICATION FOR DESIGN REVIEW APPROVAL TOWN OF VAIL GENERAL INFORMATION This application is for any project requiring Design Review approval. Any project requiring design review must receive Design Review approval prior to submitting for a building permit. For specific information,see the submittal requirements for the particular approval that is requested. The application cannot be accepted until all the required information is submitted. The project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission. Design Review Board approval expires one year after final approval unless a building permit is issued and construction is started. A. DESCRIPTION OF THE REQUEST: 7 E rhS 1- 3 SEC /377-00 C A,1 Pt,us A P ,.' vCfl ,s FA G'.4) s e 40 o SO0? F,l S F t7 [ Z.t'J1rI6 B. LOCATION OF PROPOSAL: LOT: A - 1 BLOCK: FILING: Sv.✓oi,o L PHYSICAL ADDRESS:-O yD /hb/At aoQ.d, -#A -. / 57 ti A! C. PARCEL#: (Contact Eagle Co. Assessors Office at 970-328-8640 for parcel #) D. ZONING: E. NAME OF OWNER(S): ,s L-. ,/>") R25 MAILING ADDRESS: 1525 SeR CCU /)o /0 13 o U C,oa.• ►, PHONE:30 3 - Z'2� S Z F. OWNER(S)SIGNATURE(S): APP-1; ' A G. NAME OF APPLICANT: .4) ; c� s t•. .rrii/c' . _ �,il-. ., MAILING ADDRESS: 17 C", ,2o-c l4 in ,,L,2 C> A37c.t.ivy <9 r u,pe r Ce, PHONE:e'�3�� <36 H. TYPE OF REVIEW AND FEE: / U may- )3 ❑ New Construction-$200 Construction of a new building. ❑ Addition- $50 Includes any addition where square footage is added to any residential or commercial building. XMinor Alteration- $20 Includes minor changes to buildings and site improvements,such as, reroofing,painting,window additions,landscaping,fences and retaining walls,etc. DRB fees are to be paid at the time of submittal. Later,when applying for a building permit,please identify the accurate valuation of the project. The Town of Vail will adjust the fee according to the project valuation. PLEASE SUBMIT THIS APPLICATION,ALL SUBMITTAL REQUIREMENTS AND THE FEE TO THE DEPARTMENT OF COMMUNITY DEVELOPMENT, 75 SOUTH FRONTAGE ROAD, VAIL,COLORADO 81657. For Office Use Only Fee Paid. 976; CK# By Application Date:_ ` 5 DRB Meeting Date: Pre-Application Meeting Date: 1 SEP-15-98 TUE 1 :50 PM SLIFER MANAGEMENT CO FAX NO. 9704762523 P. 1 Slifer Management Company — - Property Management & Leasing FACSIMILE COVER SHEET PLEASE DELIVER THE FOLLOWING PAGES TO: { Name: `,rLri/MI� Fax Number: 5`07 c4-- 75 S-- From r Subject: f .t /47' Comments: J �' ' 14 / ,� . i 04.'4'i tilawitze ® 4 }/ L 4 of , .4",r.,vilev. / 4 l�tlfie We are transmittin a total of pages including this cover sheet. If you do not receive all the pages, please call (970)476-1063. Thank you! 143 East 1V1eaiow Drive,Suite 360,Veil,Colorado 81657 SEP-15-98 TUE 1 :51 PM SLIFER MANAGEMENT CO FAX NO. 9704762523 P. 2 Slifer Management Company Property Management & Leasing MEMO DATE: September 15, 1998 TO: Town of Vail,Community Development FROM: Vic Chaffiot,Property Manager for Sundial Townhomes Association RE: Board Approval for Douglas Myers Please be advised that The Sundial Townhome Association Board Members have approved the requested alterations from Mr.Douglas Myers,owner of Unit A-1 Sundial Townhomes. The approval is based on the enclosed 3-item request and 3 pages of photographs showing each item"as is" and"proposed". If you have any questions,please feel free to contact me. rxiyers2 143 East Meadow Drive,Suite 360,Vail,Colorado 81657 Telephone:(970)476-1063 Telefax:(970)476-2523 • TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S . FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ELECTRICAL PERMIT Permit # : E98-0282 Job Address: 5040 MAIN GORE PL Status . . . : ISSUED Location. . . : 5040 MAIN GORE PL Applied. . : 10/29/1998 Parcel No. . : 2101-131-05-007 Issued. . . : 10/29/1998 Project No. : PRJ98-0246 Expires . . : 04/27/1999 APPLICANT WRANGLER ELECTRIC Phone : 3035249876 RUDY GARZA, 10915 W TUFTS, LITTLETON CO 80127 CONTRACTOR WRANGLER ELECTRIC Phone: 3035249876 RUDY GARZA, 10915 W TUFTS, LITTLETON CO 80127 OWNER MYERS DOUG Description: ELECTRICAL FOR REMODEL Valuation: 3 , 500 . 00 *********************************************************** FEE SUMMARY ********************************************************** Electrical---> 72.00 Total Calculated Fees---> 75.00 DRB Fee ---> .00 Additional Fees > .00 Investigation> .00 Total Permit Fee > 75.00 Will Call----> 3.00 Payments > 75.00 TOTAL FEES---> 75.00 BALANCE DUE > .00 ****************************************************************************************w***************************************** Item: 06000 ELECTRICAL DEPARTMENT De t : BUILDING Division: 10/29/1998 JRM Action: APPR APPROVED JRN Item: 05600 FIRE DEPARTMENT Dept : FIRE Division: 10/29/1998 JRM Action: APPR N/A ********************************************************************************************************************************** CONDITION OF APPROVAL ********************************************************************************************************************************** DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information provided as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the Town's zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479 2138,OR/AT OUR DICE FRO.} 8:00 AM 5:00 PM i /frVg.:S (7.: lc SIGNATURE OF OWNER OR CO RACTOR IMSELF AND OWNER ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ TOWN OF VAIL, COLORADO Statemnt ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Statemnt Number: REC-0469 Amount: 75.00 10/29/98 09:47 Payment Method: CHECK Notation: 4055 Init: SW Permit No: 598-0282 Type: S-ELEC ELECTRICAL PERMIT Parcel No: 2101-131-05-007 Site Address: 5040 MAIN GORE PL Location: 5040 MAIN GORE PL Total Fees: 75.00 This Payment 75.00 Total ALL Pats: 75.00 Balance: .00 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Account Code Description Amount EP 00100003111400 ELECTRICAL PERMIT FEES 72.00 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 "V t` )- vluI . */*Co:itact Eagle County Asse': rs Office ,t -at 970-328-8640 or Parcel i:. TOWN OF VAIL CONSTRUCTION PERMIT I`` PARCEL !1: ZL(- rMM - a$ �VI PERMIT APPLICATION FORM DATE: 16 -1-1 " Ica APPLICATION MUST BE FILLED OUT COMPLETELY OR IT MAY NOT BE ACCEPTED ****s ************************ PERMIT INFORMATION ***************************, X-k , ' [ ] -Building [ 3-Plumbing [L(.Electrical [ ] -Mec nical [ ] -Other 5'0 lie /-^ PZA-C Lx. Job Name. : :, E L'f2.S. Job` Address: Iii Legal Description: Lot Block Filing SUBDIVI ION:� h4L . -07::,,,,, ffoinz.5 Owners Name: b.iy:.:•� C L^1'L,j Address: • . Ph. Architect: Address: Ph. General DEscription: Rl'r'10 6.L ' i ' Work Class :_ [ ]-New -Alteration [ ]-Additional [ ] -Repair [ ] -Other_ Number of Dwelling Units : I Number of Accommodation Units: N tuber and Type of Fireplaces: Gas Appliances Gas Logs Wood/Pellet A ********************************* VALUATIONS *****;**************************** .'. e-)-(S) BUILDING : $ ELF'CTRICAL: $ S 60 OTHER: $ PLUMBING: $ • MECHANICAL: $ TOTAL: $ IV ******** ,****************** CONTRACTOR INFORMATION *************************** ener.al Contractor: A O BL L,,,i> Town of Vail Reg. NO A-a B ' g Address: Phone Number: Electrical Contractor: ;}AJcLr r't Li.:"LT, Town of Vail Reg. NO.236 - €:- Ac.dress: . c..'-i_ •fib + G i-c v Phone Number: T'jb"52 °987 Plumbing Contractor: .own of Vail Reg. NO. Address: Phone Number• Mechanical Contractor.: '--- Town of Vail Reg. NO. Addre; s: Phone Number: *****y *********************** ** FOR OFFICE USE ************************.**r.**x* BUILD: NG PERMIT FEE: BUILDING PLAN CHECK FEE: PL?FMB NG PERMIT FEE: PLUMBING PLAN CHECK 'EE: ME 2HA.l ICAL PERMIT FEE: MECHANICAL PLAN CHECK FEE: ELCTI ICAL FEE: RECREATION FEE: _ OT:iER TYPE OF FEE: • CTFAN-UP DEPOSIT: DRB FIE: ; TOTAL PERMIT FEES : TYPE GROUT : Q.FT. VALUATION BUILDING: SIGNATURE: ZONING: SIGNATURE: . Comments: • r'LE;}; l? DEPOSIT ?UM) TO: i • • • • t 0t VdI 75 south frontage road . • vall, colorado 81657 (303) 479-21.•38 or 479-2139 office of community development • • TO: ALL CONTRACTORS CURRENTLYL REGISTERED WITH ,THE TOWN OF VAIL FROM: TOWN OF VAIL PUBLIC WORKS/COME-UNITY DEVELOPMENT DATE: - - MARCH 16 , 1988 • SUBJECT: CONSTRUCTION PARKING & MATERIAL STORAGE In summary, Ordinance No. 6 states that it is unlawful for any person to litter, track or deposit any soil, rock, sand, debris or material, including trash dumpsters, portable toilets and wo? kmen vehicles upon any street, sidewalk, alley or public plJce or any portion thereof. The right-of-way on all. Town of Va 1 streets and roads is approximately 5 ft. off pavement. Th s ordinance will be: strictly enforced by the Town of Vail Public •P7orks Department. Persons found violating this ordinance will be' given a 2.4 hour written notice to remove said material . In the event the person so notified does not comply with the notice within the 24 hour time specified, the Public 'Works . Department will remove said material at the expense of perscn notified. The provisions of this -ordinance shall not be applicable to construction, maintenance or repair projects of any street or alley or any utilities in the right-a-way. ' • To review--Ordinance No: 6 in full , please stop-by the Town of Va . Building Department to obtain a copy. Thank you for your ' cooleration on this matter. • • Read and a . owledged b : • geit os tion/Relationship to Project (i . e. contractor, owner) d0-2•- ?ei Dat • • • • • "Contact Eagle County Asses..urs Office . t at 970-328-8640 for Parcel #. TOWN OF VAIL CONSTRUCTION PER iIT PARCEL #: 2/0/- /Jl -05-, 2O7 PERMIT APPLIC TT N FORM ()�J�37,) DATE• S S • APPLICATION MUST BE FILLED OUT COMPLETELY OR IT t► r Veva ***************************** PERMIT INFORMATION ** * ***** * ****** *. ::-****, * , ' [ j-Building [ ]-Plumbing [ ]-Electrical [ ] -Mechanical [ ]-Other ,4-I Job Name: _.trim I /Uc:aii�a ( Job Address: .6-6;/0 /-7"r;.1 Lar ' _FY_ Legal Description: Lot Block Filing SUBDIVISION: o� Owners Name: 0 Pliecs Address: /6a,,, .5- ('-': '-`O 7 Ph.y/2��y� a Y,.� t-ez : Address: ,Qdcj CO Ph. General Description: tA.);,1jjco fAirchevi CjiQ e,s (see_ bra.�,,,,v) i Work Class:_ [ ]-New [2)0f-Alteration [ ]-Additional [ ] -Repair [ ]-Other Number of Dwelling Units: . 5-0/x Number of Accommodation Units : N mber and Type of Fireplaces: Gas Appliances Gas Logs Wood/Pellet.,." 'X-.1********************************* VALUATIONS **************************:******:: BUILDING: $ '`��,C04) ELECTRICAL: $ OTHER: $ PLUMBING: $ ' MECHANICAL: $ L: $ ki,+" ssz. *************************** CONT• •CTOR I � ��`,. • A DN T eneral Contractor: r ," I, Y of Vail Reg. NO. f =fAddress: /3 ( /O /ves.,,m, CC9 . to e, Number: ?7.0 - 336,6 Electrical Contractor: totct l_v- -(�� I o ail Reg. NO. Address : 4yrsc.A.-► C'_ _ on umber: �y- �L$�Ca Plumbing Contractor: Sji /7 w of Vail Reg. NO. Address: .ce_C/c•_ C Cj hone Number: ,3„2$- /6,2'> _ Mechanical Contractor.: Coe_LfM.Gr /fe vc d � Town of Vail Reg. NO. Address: 67rSCLw■ C'�© , Phone Number: s7,2, y- '8/.3 ******************************** FOR OFFICE USE ******************************p. BUILDING PERMIT FEE: BUILDING PLAN CHECK FEE: PLUMBING PERMIT FEE: PLUMBING PLAN CHECK •FEE: , MECHANICAL PERMIT FEE: MECHANICAL PLAN CHECK FEE: ELECTRICAL FEE: RECREATION FEE: OTHER TYPE OF FEE: CLEAN-UP DEPOSIT: DRB FEE: TOTAL PERMIT FEES : TYPE GROUP SQ.FT. VALUATION BUILDING: SIGNATURE: s ZONING: SIGNATURE: Comments: • PCLEAN UP DEPOSIT REFUND TO: • • • 14" • tows of Uai • 75 south frontage road • vat!, colorado 61657 (303) 479-21.38 or 479-2139 office of community development TO: ALL CONTRACTORS CURRENTLYL REGISTERED WITH THE TOWN OF VAIL • FROM: TOWN OF VAIL PUBLIC WORKS/COMMUNITY DEVELOPMENT DATE: - - MARCH 16, 1988 • SUBJECT: CONSTRUCTION PARKING & MATERIAL STORAGE In summary, Ordinance No . 6 states that it is unlawful for any person to litter, track or deposit any soil , rock, sand, debris or material , including trash dumpsters, portable toilets and workmen vehicles upon any street, sidewalk, alley or public place or ail-1y portion thereof. The right-of-way on all ' Town of Vail streets, . 1-1d roads, is approximately 5 ft. off pavement. This ordinance will be S,trictly enforced by the Town of Vail Public -Works Department: Persons found violating this ordinance will be. given a 24 hour written notice to remove said material . In the event t o per on so notified does not comply with the notice within `( r2,-:24 ' hour time specified, the Public Works Department`-''will remove said material at the expense of person • notified_ The,,provisions of this ordinance shall not be applicable to Construction, maintenance or repair projects of any street or alley or any utilities in the right-a-way, ' • To review--Ordinance No: 6 a full , please stop by the Town of Vail Building Department to obtain a copy. Thank you for your cooperation on this matter. • Read 3 4 .ckn .I•e./.y: • C(1.) .41/#( 7 ii2/04C., osition/ •elationship to Project (i . e. ontractor owner) Date • • 4111111111k11 NW II [It V31 75 south frontage road . wall, colorado 81657 (303) 479-2138 or 479-2139 office of community development • BUILDING PERMIT ISSUANCE TIME FRAME . If this permit requires a Town of Vail Fire Department Approval , Engineer's (Public Works) review and approval , a Planning Department review or Health Department review, and a review by the Building Department, the estimated time for a total review may take as long as three weeks.. All commercial '(:large or small ) and all multi-family permits will have to follow the above mentioned maximum requirements . Residential ' and small projects should take a lesser amount of time . However, if residential or smaller projects impact the various above mentioned departments with regard to necessary 'review, these projects may also take the three week period . • Every attempt will be made by this department to expedite this • permi:t.as. soon as possible. I , the undersigned, understand the plan check procedure and time frame, . / ./ . .i 'IF f/// - , A 'ree• to •y.. / . Gt-✓1 dr 14. f C?0-)4 .s . ./ Project Name //25--/?.CS7 . . Date Work Sheet was turned into the Community Development Department. • MEMORANDUM TO: ALL CONTRACTORS FROM: TOWN OF VAIL PUBLIC WORKS DEPARTMENT DATE: MAY 9, 1994 • RE: WHEN A "PUBLIC WAY PERMIT ' 1S REQUIRED Job Name: • • Date: Please answer the following questionnaire regarding the need for a "Public Way Permit": YES NO 1) Is this a new residence? • MO • 2) Is demolition work being performed • that requires the use of the right �p of way, easements or public property? • Ate 3) Is any utility work needed? 4) Is the driveway being repaved? �0 5) Is different access needed to site NC) other than existing driveway? • 6) Is any drainage work being done u 0 • affecting the right of way, easements, • or public property? 7) Is a "Revocable Right Of Way Permit" • required? . 8) A. Is the right of way, easements orb public property to be used for staging, parking or fencing? • B. If no to 8A, is a parking, staging Aa or fencing plan required by Community • Development? • If you answered yes to any of these questions, a "Public Way Permit" must be obtained. "Public Way Permit" applications may be obtained at the Public Work's office or at Community Development. . If you have any questions please call Charlie Davis, the Town • of Vail Construction Inspector, at 479-2158. • I have read and answered all the above qu ,io s. / %�co ,ran/es 41- � !�� Job Name Contractor's Signatur- Date • TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S . FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT MF BUILD PERMIT Permit # : B98-0301 Job Address : 5040 MAIN GORE PL Status . . . : ISSUED Location. . . : 5040 MAIN GORE PL (SUNDIAApplied. . : 10/02/1998 Parcel No. . : 2101-131-05-007 Issued. . . : 10/02/1998 Project No. : PRJ98-0246 Expires . . : 03/31/1999 APPLICANT A.R. BUILDERS Phone : 970-524-7397 P.O. BOX 610, GYPSUM, CO. 81637 r'' 1mpACTOR A.R. BUILDERS Phone: 970-524-7397 P. O. BOX 610, GYPSUM, CO. 81637 OWNER MYERS DOUG TOV/Comm. Dev. Description: Clean-up Deposit Refund WINDOW AND KITCHEN REMODEL n approved '`_. f � Occupancy: R3 Single Family Res Residenecenount > �� Type Construction: V 1-HR Type V 1-Hour Type Occupancy: date /.71 Valuation: 45, 000 Add Sq Ft : Fireplace Information: Restricted: Y #Of Gas Appliances: #Of Gas Loge: #Of Wood/Pallet: +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ FEE SUMMARY ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Building > 455.00 P.estuarant Plan Review--> .00 Total Calculated Fees---> 1,053.75 Plan Check > 295.75 DRB Fee > 50.00 Additional Fees > 55.00 Investigation> .00 Recreation Fee > .00 Total Permit Fee > 1,108.75 Will Call----> 3.00 Clean-Up Deposit > 250.00 Payments > 1,108.75 TOTAL FEES > 1,053.75 BALANCE DUE > .00 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Item: 05100 BUILDING DEPARTMENT De t : BUILDING Division: 10/02/1998 JRM Action: APPR APPROVED JRMp Item: 05400 PLANNING DEPARTMENT Dept : PLANNING Division: 10/02/1998 JRM Action: APPR APPR PER BREN'1' Item: 05600 FIRE DEPARTMENT Dept : FIRE Division: 10/02/1998 JRM Action: APPR N/A Item: 05500 PUBLIC WORKS Dept : PUB WORK Division: 10/02/1998 JRM Action: APPR N/A Ecica Page 2 of this Document for any conditions that may apply to this permit . DECLARATIONS 7 F reby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information provided as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure accord' g to the Town's zoning and subdivision .oc'3 ,le:3ign review approved, Uniform Building Code and other ordinances of the T. •.licable t _ - REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHON; R • 0 ' FROM FROM 8:00 AM 5:00 PM _aI/. 2 /Air /1 / Send Clean-Up Deposit To: A. R. BUILDERS SIGNATURE OF OWNER OR •• RAA '• FOR HIMSELF AND OWNER r******************************************************************************* CONDITIONS # : B98-0301 as of 10/02/98 Status : ISSUED ******************************************************************************** Permit Type : ADD/ALT MF BUILD PERMIT Applied: 10/02/1998 Applicant : A.R. BUILDERS Issued: 10/02/1998 970-524-7397 To Expire : 03/31/1999 Job Address : Location: 5040 MAIN GORE PL (SUNDIAL Al-101) Parcel No : 2101-131-05-007 Description: WINDOW AND KITCHEN REMODEL Conditions : 1 . FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. 2 . ALL PENETRATIONS IN WALLS, CEILINGS,AND FLOORS TO BE SEALED WITH AN APPROVED FIRE MATERIAL. 3 . SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND EVERY STORY AS PER SEC. 1210 OF THE 1991 UBC. 4 . FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE STARTED. 5 . WILL NEED STRUCTURAL ENG LETTER ON WINDOW CUT OUTS PRIOR TO FRAMING INSPECTION 6 . ELEC, PLMB,MECH PERMITS TO BE PICKED UP BY CONTRACTORS • ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ TOWN OF VAIL, COLORADO Statemnt Statemnt Number: REC-0458 Amount: 1,108.75 10/02/98 15:56 Payment Method: CK Notation: 158 Init: LC Permit No: B98-0301 Type: A-MF ADD/ALT MF BUILD PER N:: 2101-131-05-007 Site Address: 5040 MAIN GORE PL Location: 5040 MAIN GORE PL (SUNDIAL Al-101) Total Fees: 1,108.75 This Payment 1,108.75 Total ALL Pmts: 1,108.75 Balance: .00 Account Code Description Amount DR 00100003112200 PRE PAID DES REV BOARD -20.00 BP 00100003111100 BUILDING PERMIT FEES 455.00 DR 00 10000311220.0 DESIGN REVIEW FEES 50.00 PF 00100003112300 PLAN CHECK FEES 295.75 ' CL 00100003123000 CONTRACTOR LICENSES 75.00 AD D2-DEPO8 CLEANUP DEPOSITS 250.00 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 , . . • NU DI NI • 75 south frontage road • yell, co{orado 81657 (303) 479-2138 or 1,79-2139 office of community development . • BUILDING PERMIT ISSUANCE TIME FRAME . If• this permit requires a Town of Vail Fire Department Approval , Engi neer'•s (Public Works) reyiew and approval , •a Planning Department revieti•r• or Heilth Department review,' and a review by the Building Department, the estimated time for a total review may take as lone as three wee;<s.. All commercie.l •(•large or small ) and all multi-gamily permits will have to follcw the above mentioned maximum requirements . Residential ' • and small prc jects should take a lesser amount of time . However; if residential cr smaller projects impact the various above mentioned departments ' th regard to necessary .review, these projects may also take the three week period , . • Every attempt will to made by this department to expedite this , ' permi.t.as. soon as posible. I , the undersigned , understand the plan check procedure and time frame, • AcU to :y.. • • • • • • (4.ra s° koCE • • . • Project—Name • • • /O —2. t • Date Work Sheet was turned into the • . .Community Development Department. • • MEMORANDUM TO: ' ALL CONTRACTORS FROM: TOWN OF VAIL PUBLIC WORKS DEPARTMENT DATE: MAY 9, 1994 • RE: WHEN A "PUBLIC WAY PERMIT" IS REQUIRED • • Job Name: r,, � "1 y S �.mo QLC Date: !lam - 121 — 9 l • Please answer the.following questionnaire regarding the need for a "Public Way Permit": • YES NO . • 1) Is this a nEw residence? 2) Is demolition work being performed • that requires the use of the right . of way, easements or public property? ' • 3) Is mny utility work needed? N(°� . ) is .he criveway being repaved? 5) Is different access needed to site of er than existing driveway? 6) Is ;any drainage work being done • affecting the right of way, easements, or public property? 7) Is a "Revocable Right Qf Wa y Permit" required? 8) A. Is the right-of way, easements or t� public property to be used for staging, parking or fencing? B. If no to 8A, is a parking, staging • • or fencing plan required by Community Development? • I you answered yes to an: of these questions, a "Public Way Permit" must be obtained. " 'ublic Way Permit" applications may be obtained at the Public Work's office or at Community Development. . If you have any questions please-call Charlie Davis, the Town of Vail Constriction Inspector, at 479-2158. • • • f have read and answ,!red all the abo ues Sons. • 1).e.1 to Name Contractor's Signature Date TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S . FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES PLUMBING PERMIT Permit # : P98-0148 'Job Address: 5040 MAIN GORE PL Status . . . : ISSUED Location. . . : SUNDIAL TH UNIT A-1 Applied. . : 10/19/1998 Parcel No. . : 2101-131-05-007 Issued. . . : 10/19/1998 Project No. : PRJ98-0246 Expires . . : 04/17/1999 APPLICANT SMITH MECHANICAL Phone : 970328-1677 BOX 1125, EAGLE, CO 81631 CONTRACTOR SMITH MECHANICAL Phone: 970328-1677 BOX 1125 , EAGLE, CO 81631 OWNER MYERS DOUG Description: LUMBIG FOR REMODEL Valuation: 4 , 500 . 00 wwwwww..........w...w...................................... FEE SUMMARY ******************wwwww awww........w....ww.wwww........... Plumbing > 75.00 Restuarant Plan Review--> .00 Total Calculated Fees---> 96.75 Plan Check > 18.75 TOTAL FEES > 96.75 Additional Fees > .00 Investigation> .00 Total Permit Fee > 96.75 Will Call----> 3.00 Payments > 96.75 BALANCE DUE > .00 ....................................................................................................................+wwww......... Item: 05100 BUILDING DEPARTMENT Dept : BUILDING Division: 10/19/1998 CHARLIE Action: APPR CHARLIE DAVIS Item: 05600 FIRE DEPARTMENT Dept : FIRE Division: 10/19/1998 CHARLIE Action: APPR N/A ............wwww.....wwwww.......+www...wwwww..wwwww.,r,r,r**...................www....wwwww+.wwwww...........+www......wwwwww..wwwww CONDITION OF APPROVAL 1 . FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. .......www................................................................................................w....................... DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information provided as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the Town's zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHON .7J 2138 O: • OF` E FROM 8:00 AM 5:00 PM AO SIGNATURE OF OWNER OR/ RA%ONTRA HIMSELF AND OWNER • }+++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ TOWN OF VAIL, COLORADO Statemnt ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Statemnt Number: REC-0466 Amount: 96.75 10/19/98 14:49 Payment Method: CK Notation: 4043 Init: LC Permit No: P98-0148 Type: B-PLMB PLUMBING PERMIT Parcel No: 2101-131-05-007 Site Address: 5040 MAIN GORE PL Location: SUNDIAL TH UNIT A-1 Total Fees: 96.75 This Payment 96.75 Total ALL Putts: 96.75 Balance: .00 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Account Code Description Amount PP 00100003111200 PLUMBING PERMIT FEES 75.00 PF 00100003112300 PLAN CHECK FEES 18.75 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 �.kCo.ltact Eagle County Asses :s Office �g gg 40 o P rc�l +,-. TOWN OF VAIL CONSTRUCTION . PERMIT JP/a\LEL 970-3 QL,II�� -�j � `�� U ��If: b1- 7 PERMIT APPLIC IO FORM Date !- APPLIar ''!l-'WWI BE FILLED OUT COMPLETELY OR IT MAY NOT BE ACCEPTED a***** *********************•*** PERMIT INFORMATION *************************k**- -Building -Plumbing Electrical Mechanical Other JJ t. Job Name: /lob Address: 6504(0 6,rc Legal Description: Lot Block Filing SUBDIVISIO`:: Owners Name: . . Alt Address: - S y- Ph. Architect: r)0_ i*t Address: Ph. General Description: J tiy�j� Fok 6:-.a/Vle0F( Work Class :_ [ ]-New Alteration [ ]-Additional [ ] -Repair [ ] -Other Number of Dwelling Units: _ Number of Accommodation Units: N mber and Type of Fireplaces: Gas Appliances Gas Logs Wood/Pellet ! A. ********************************* VALUATIONS ****5 **************************** BUILDING:BUILDING: $ ELECTRICAL: $ OTHER: $ PLUMBING: $ 'XS-6)0 • MECHANICAL: $ TOTAL: $ .11. ******** *********** T- •CTOR INFORMATION ********************* ***** eneral Contractor: 1 1 c.� r 4 c° Town of Vail Reg. NO . Address: 6 f,f-'.Scc ( phone Number: r Electical Contractor: Town of Vail Reg. NO. Ac.dress: " Phone Number: Plumbing Contractor: �° �� of � g � :5 �-�-� / �� L �.� ( Town o,� Vail Reg. NC . �, s p Address: '_0, W t' 0 Phone Number: 3a, , 2 Mecha::;ical Contractor.: Town of Vail Reg. NO. Address: Phone Number: • *****7 ************************** FOR OFFICE USE ******************************* BUILDING PERMIT FEE: BUILDING PLAN CHECK FEE: PLr iMB NG PERt.LLT FEE: PLUMBING PLAN CHECK TEE: ME .:HA1ICAL PERMIT FEE: • MECHANICAL PLAN CHECK FEE: EL,CT% ICAL FEE: RECREATIC:: FEE: OT;IER TYPE OF FEE: CLEAN-UP DEPOSIT: _ DRB Fl E: TOTAL PERMIT E. 1 . TYPE GROUT EQ.FT. VALUATION BUILDING: SIGNATURE: ZONING: SIGNATURE: Comments: • ','? DEPOSIT RE iJND TO: • .4410 • tow[ of Udl • 75 south frontage road , • vail, colorado 81657 (303) 479-2138 or A79-2139 office of community development • • • TO: ALL CONTRACTORS CURRENTLXL REGISTERED WITH .THE TOWN OF VAIL • FROM: TOWN OF VAIL PUBLIC WORKS/CO,II•IUNITY DEVELOPMENT DATE: - MARCH 16 , 1988 SUBJECT: CONSTRUCTION PARKING & MATERIAL STORAGE In summary, Ordinance No. 6 states that it is unlawful for any person to litter, track or deposit any soil, rock, sand, debris or material , including trash dumpsters, portable toilets and workmen vehicles upon any street, sidewalk, alley or public plce or any portion thereof. The right-of-way on all Town of Va 1 streets and roads is approximately 5 ft. off pavement. Th s ordinance will be strictly enforced by the Town of Vail Public -Works Department. Persons found violating this ordinance will be. given a 24 hour written notice to remove said material . In the event the person so notified does not comply with the notice witi. 1 the 24 hour time specified, the Public 'Works Department will remove said material at the expense of person • notified. The provisions of this ordinance shall not be applicabLe to construction, maintenance or repair projects of any street or alley or any utilities in the right-a-way. ' To review-Ordinance No: 6 in full , please stop by the Town of Va . Building Dep=n,Yt_rent to obtain a copy . Thank you for your ' coo )era tion on this matter. • Read c,7 , knof - ge d by: • y/ , � • /v r c: /RelatIonship to Project (i. e. contracto5ybwner) ./(3 r/A: XDat • tii t 1,181 75 south frontage road vail, colorado 81657 (333) 479-2138 or 479-2139 office of community development . • BUILDING PERMIT ISSUANCE TIME FRAME . If this permit requires a Town of Vail Fire Department Approval , Engineer's (Public Works) review and •approval , a Planning Department . review- or He:Ilth Department review,' and a review by the Building Department, '..he estimated time for a total review may take as lone as three wee,;s.. All commerci 1 (large or small ) and all multi-family permits will have to follcw the above mentioned maximum requirements. Residential and small pre jects should take a lesser amount of time . However, if residential cr smaller projects impact the various above mentioned departments t.i.th regard to necessary review, these projects may also take the three week period . . • Every attempt will ke made by this department to expedite this . ' permi:t.as. soon as possible. I , the undersigned, understand the plan check procedure and time frame, %; - %.%; - -7- • * ; , • Acy.e.e to .y., . . -1-; 4,— �� � � �Ci�vf�/mac%�n� �> AZ-7 • . . . . ` Project Name Y , e_ or Date W rk Sheet was turned into the . *Community Development Department. • MEMORANDUM TO: ' ALL CONTRACTORS FROM: TOWN OF VAIL PUBLIC WORKS Di;ri I MLNT • DATE: MAY 9, 1994 • RE: WHEN A "PUBLIC WAY PERMIT" IS REQUIRED • • Job Name: e • Date: ./(-)7?F7r • Please answer the following questionnaire regarding the need for a "Public Way Permit: YES NO . • 1) Is this a new residence? 2) Is demolition work being performed • that requires the use of the right • "r of way, easements or public property? • 3) Is lny utility work needed? c_5 -(c---1-c'r 4) Is .he criveway being repaved? f'J G • 5) Is different access needed to site //,'1 a other than existing driveway? 6) Is zny drainage work being done /U'0 aff,:cting the right of way, easements, • or public property? . • 6 7) Is a "Revocable Right Of Way Permit" required? • • 8) A. Is the right of way, easements or ,4(G public property to be used for stan'ng parking or fencing? • B, If no to 3A, is a parking, staging or fencing plan required by Community • - Development? you answered yes to of these questions, a "Public Way Permit" must be obi,Iiied. 3ublic Way rermit" applications may be obtained at the Public Work's office or at Community Development. . If you have any questions please.call Charlie Davis, the Town of Vail Construction Inspector, at 479-2158. • I have read and answ :red all the above quest's i . % ;(, Name Contractor's Signature / late �. • TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT 75 S . FRONTAGE ROAD VAIL, CO 81657 970-479-2138 NOTE : THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MECHANICAL PERMIT Permit # : M98-0209 Job Address . . . : 5040 MAIN GORE PL Status . . . : ISSUED Location • SUNDIAL TH UNIT A-101 5040 MAIApplied. . :C10/20/1998 Parcel No - 2101-131-05-007 Issued. . . : 10/21/1998 Project Number: PRJ98-0246 Expires . . : 04/19/1999 APPLICANT WIEMER' S HEATING & SHEETMETAL Phone : 524-9315 P. O. BOX 22 , EAGLE, CO 81631 CONTRACTOR WIEMER' S HEATING & SHEETMETAL Phone : 524-9315 P.O. BOX 22 , EAGLE, CO 81631 OWNER MYERS DOUG Description: Valuation: 4 , 400 . 00 INSTALL FORCED AIR SYSTEM Fireplace Information: Restricted: Y #Of Gas Appliances: #Of Gas Logs: Of Wood/Pallet: +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ FEE SUMMARY ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Mechanical---> 100.00 Restuarant Plan Review--> .00 Total Calculated Fees---> 128.00 Plan Check---> 25.00 DRB Fee > .00 Additional Fees > .00 Investigation> .00 TOTAL FEES > 128.00 Total Permit Fee > 128.00 Will Call----> 3.00 Payments > 128.00 BALANCE DUE > .00 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Item: 05100 BUILDING DEPARTMENT Dept : BUILDING Division: 10/20/1998 CHARLIE Action: APPR SEE CONDITIONS Item: 05600 FIRE DEPARTMENT Dept : FIRE Division: 10/20/1998 CHARLIE Action: APPR N/A CONDITION OF APPROVAL 1 . FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. 2 . COMBUSTION AIR IS REQUIRED PER SEC. 607 OF THE 1991 UMC. 3 . INSTALLATION MUST CONFORM TO MANUFACTURES INSTRUCTIONS AND TO APPENDIX CHAPTER 21 OF THE 1991 UMC. 4 . GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 9 AND SHALL TERMINATE AS SPECIFIED IN SEC. 906 OF THE 1991 UMC. 5 . ACCESS TO HEATING EQUIPMENT MUST COMPLY WITH SEC. 505 AND 703 OF THE 1991 UMC. 6 . BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING. 7 . PERMIT, PLANS AND CODE ANALYSIS MIUST BE POSTED IN MECHANICAL ROOM PRIOR TO AN INSPECTION REQUEST. 8 . DRAINAGE OF MECHANICAL ROOMS CONTAINING HEATING OR HOT-WATER SUPPLY BOILERS SHALL BE EQUIPPED WITH A FLOOR DRAIN PER SEC. 2119 OF THE 1991 UMC. ******************************************************************************** DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information provided as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the Town's zoning and subdivision codes, design review approved, Uniform Building Code and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 0:00 AM 5:00 PM SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNER TOWN OF VAIL, COLORADO Statemnt Statemnt Number: REC-0467 Amount: 128.00 10/21/98 09:41 Payment Method: CK Notation: 2087 Init: KW Permit No: M98-0209 Tyne: B-MECH MECHANICAL PERMIT Parcel No: 2101-131-05-007 Site Address: 5040 MAIN GORE PL Location: SUNDIAL TH UNIT A-101 5040 MAIN GORE PLACE Total Fees: 128.00 This Payment 128.00 Total ALL Pmts: 128.00 Balance: .00 Account Code Description Amount MP 00100003111300 MECHANICAL PERMIT FEES 100.00 PF 00100003112300 PLAN CHECK FEES 25.00 WC 00100003112800 WILL CALL INSPECTION FEE 3.00 1 Date Pciceived ontact Eagle County Assessors Office OCT 6(4) 1998 t 970-328-8640 for Parcel II . TOWN OF VAIL CONSTRUCTION PERMIT 1Jia°L�-Q , j REL 11: -ZAP / /3/ OS007 PERMIT APPLICATION N FORM / DATE: /0/.2c7/ 1- ._. • APPLICATION MUST BE FILLED OUT COMPLETELY OR IT MAY NOT BE ACCEPTED ***************************** PERMIT INFORMATION ***************************** [ ] -Building [ ] -Plumbing [ ] -Electrical 01 -Mechanical [ ] -Other ob Name: pnc,,1 y o Job Address: SC 3/44 )3/)A,,.. 6a, z ,egal Description: Lot Block Filing SUBDIVISION: wners Name: TJ p 5.14 .27-e/ Address: Ph. rchitect: Address: Ph. eneral Description: ,vS7// ork Class : [ ] -New [, 'j -Alteration [ ] -Additional [ ] -Repair [ ] -Other umber of Dwelling Units : Number of Accommodation Units : jmber and Type of Fireplaces: Gas Appliances Gas Logs Wood/Pellet ********************************* VALUATIONS ********************************* UILDING: $ ELECTRICAL: $ OTHER: $ LUMBING: $ MECHANICAL: ' ' yU0 TOTAL: $ *************************** ***k*********************** CONTRACTOR INFORMATION eneral Contractor: Town of Vail Reg. NO. ddress: Phone Number: lectrical Contractor: - Town of Vail Reg. NO. ddress: Phone Number: lumbing Contractor: Town of Vail Reg. NO. ddress: _ Phone Number: echanical Contractor: ,t c 7,gT,,,c Town of Vail Reg. NO. ;5r ddress: N/ 13,4, 2 2- ,F 4,/, i,3/ Phone Number: 3,2 /.S ******************************* FOR OFFICE USE ******************************* UILDING PERMIT FEE: BUILDING PLAN CHECK FEE: LUMBING PERMIT FEE: PLUMBING PLAN CHECK TEE: ECHANICAL PERMIT FEE: MECHANICAL PLAN CHECK FEE: LECTRICAL FEE: .RECREATION FEE: THER TYPE OF FEE: CLEAN-UP DEPOSIT: RB FEE: TOTAL PERMIT FEES: TYPE GROUP SQ. FT. VALUATION BUILDING: SIGNATURE: ZONING: SIGNATURE: omments: • LEAN UP DEPOSIT REFUND TO: i . _ .. tE1ifl t Y 75 south frontage road vail, colorado 81657 (303) 479-2138 or 479-2139 office of community development TO: ALL CONTRACTORS CURRENTLYL REGISTERED WITH THE TOWN OF VAIL • FROM: TOWN OF VAIL PUBLIC WORKS/COMMUNITY DEVELOPMENT • DATE: MARCH 16, 1988 SUBJECT: CONSTRUCTION PARKING & MATERIAL STORAGE In summary, Ordinance No. 6 states that it is unlawful for any person to litter, track or deposit any soil , rock, sand, debris or material, including trash dumpsters , portable toilets and workmen vehicles upon any street, sidewalk, alley or public place or any portion thereof. The right-of-way on all Town of Vail streets and roads is approximately 5 ft. off pavement. This ordinance will be strictly enforced by the Town of Vail Public Works Department. Persons found violating this ordinance will be given a 24 hour written notice to remove said material. In the event the person so notified does not comply with the notice within the 24 hour time specified, the Public Works Department will remove said material at the expense of person notified. The provisions of this ordinance shall not be applicable to construction, maintenance or repair projects of any street or alley or any utilities in the right-a-way. ' To review Ordinance No . 6 in full, please stop by the Town of Vail Building Department to obtain a copy. Thank you for your cooperation on this matter. • Read and acknowledged by: . )1((fz ."-1/16.44-.%-/-7,--p,-----' . • 'Position/Relationship to Project (i.e. contractor, owner) / /, '// f Date 1-3, 1? L57-- (231 o-0 70 5'i 4 ( J/ e /C 0 o ci M tyz/- _ CALC/PLUS COMPUTER GENERATED HEAT LOSS/GAIN CALCULATION Capyright (C) 1987-1993 by Edward Horgan, Horgan Vertical Applications Company RD # 9 - Box 273 , Coatesville, PA 19320 (215) 384-1923 DESIGN: WINTER, 90 DEGREES DIFFERENCE SUMMER, 20 DEGREES DIFFERENCE JOB: MEYERD - RESIDENTIAL CALCULATION HTM HTM AREA BTU/HR BTU/HR DATE: 10/7/98 HEAT COOL OR # LOSS GAIN BASEMENT - AREA # 1 HEAT COOL AREA LOSS GAIN WALLS, MORE THAN 5 FT BELOW GRADE, R19 IN 2 . 7 0 . 0 398 1078 0 FLOOR, 2 FEET OR MORE BELOW GRADE 2 .2 0 . 0 555 1217 0 3 WINDOWS 24 X 36 IN, TYPE 2 , SHADED 52 .4 25 .0 18 943 450 TOTAL REQUIRED CFM AND BTU HEAT LOSS/GAIN CFM LOSS GAIN CFM @ RECOMMENDED MAX .VELOCITY OF 600 FPM 45 3238 450 FOR FORCED AIR HEATING OR AIR CONDITIONING: REQUIRES : 1 BRANCH DUCT - (5 IN ROUND) OR (5 IN OVAL) OR (3-1/4 X 8 WALL STACK) REQUIRES : 1 #661 6 X 4 SIDEWALL REGISTER OR 1 #411 2-1/4 X 10 FLOOR DIFFUSER OR REQUIRES : 1 #16 6 IN ROUND CEILING DIFFUSER OR 1 #24 6 X 6 INCH SQUARE DIFFUSER REQUIRES : 1 #650 10 X 6 INCH RETURN AIR GRILL FOR ONE 3-1/4 X 14 IN-WALL RETURN BED ROOM # 1, SOUTH & EAST HEAT COOL AREA LOSS GAIN 1 WINDOW 48 X 60 IN, TYPE 2 , SHADED 52 .4 25 . 0 20 1047 500 WALL 11 X 8 FT, FRAME OR VENEER, R19 INSUL 5 .4 1 . 7 68 368 116 WALL 15 X 8 FT, FRAME OR VENEER, R19 INSUL 5 .4 1 . 7 120 650 204 ALLOWANCE FOR INFILTRATION, TIGHT CONST 10 . 8 1 . 1 0 0 0 ALLOWANCE FOR LATENT HEAT 0 . 0 0 .3 820 0 246 TOTAL REQUIRED CFM AND BTU HEAT LOSS/GAIN CFM LOSS GAIN CFM @ RECOMMENDED MAX VELOCITY OF 600 FPM 36 2065 1066 FOR FORCED AIR HEATING OR AIR CONDITIONING: REQUIRES: 1 BRANCH DUCT - (5 IN ROUND) OR (5 IN OVAL) OR (3-1/4 X 8 WALL STACK) REQUIRES : 1 #661 6 X 4 SIDEWALL REGISTER OR 1 #411 2-1/4 X 10 FLOOR DIFFUSER OR REQUIRES : 1 #16 6 IN ROUND CEILING DIFFUSER OR 1 #24 6 X 6 INCH SQUARE DIFFUSER REQUIRES : 1 #650 10 X 6 INCH RETURN AIR GRILL FOR ONE 3-1/4 X 14 IN-WALL RETURN FOYER, SOUTH HEAT COOL AREA LOSS GAIN 1 DOOR 36 X 80 IN, TYPE 3 41 . 5 12 . 7 20 831 254 1 WINDOW 33 X 72 IN, TYPE 2 , SHADED 52 .4 23 . 0 17 864 380 WALL 9 X 8 FT, FRAME OR VENEER, R19 INSULA 5 .4 1 . 7 36 195 61 ALLOWANCE FOR INFILTRATION, TIGHT CONST 10 . 8 1 . 1 0 0 0 ALLOWANCE FOR LATENT HEAT 0 . 0 0 . 3 695 0 209 TOTAL REQUIRED CFM AND BTU HEAT LOSS/GAIN CFM LOSS GAIN CFM @ RECOMMENDED MAX VELOCITY OF 600 FPM 30 1890 904 FOR FORCED AIR HEATING OR AIR CONDITIONING: REQUIRES : 1 BRANCH DUCT - (5 IN ROUND) OR (5 IN OVAL) OR (3-1/4 X 8 WALL STACK) REQUIRES : 1 #661 6 X 4 SIDEWALL REGISTER OR 1 #411 2-1/4 X 10 FLOOR DIFFUSER OR REQUIRES : 1 #16 6 IN ROUND CEILING DIFFUSER OR 1 #24 6 X 6 INCH SQUARE DIFFUSER REQUIRES : 1 #650 10 X 6 INCH RETURN AIR GRILL FOR ONE 3-1/4 X 14 IN-WALL RETURN BATH RM # 1, SOUTH HEAT COOL AREA LOSS GAIN EXHAUST FAN, 45 CFM WITH .50 USAGE 48 . 8 11 . 0 45 2194 495 WALL 8 X 8 FT, FRAME OR VENEER, R19 INSULA 5 .4 1 . 7 64 347 109 ALLOWANCE FOR INFILTRATION, TIGHT CONST 10 . 8 1 . 1 0 0 0 ALLOWANCE FOR LATENT HEAT 0 . 0 0 . 3 604 0 181 ALLOWANCE FOR BATHROOM COMFORT 0 .2 0 . 0 2541 508 0 TOTAL REQUIRED CFM AND BTU HEAT LOSS/GAIN CFM LOSS GAIN CFM @ RECOMMENDED MAX VELOCITY OF 600 FPM 42 3049 785 FOR FORCED AIR HEATING OR AIR CONDITIONING: REQUIRES : 1 BRANCH DUCT - (5 IN ROUND) OR (5 IN OVAL) OR (3-1/4 X 8 WALL STACK) REQUIRES : 1 #661 6 X 4 SIDEWALL REGISTER OR 1 #411 2-1/4 X 10 FLOOR DIFFUSER OR REQUIRES : 1 #16 6 IN ROUND CEILING DIFFUSER OR 1 #24 6 X 6 INCH SQUARE DIFFUSER REQUIRES : 1 #650 10 X 6 INCH RETURN AIR GRILL FOR ONE 3-1/4 X 14 IN-WALL RETURN LIVING ROOM, SOUTH & WEST HEAT COOL AREA LOSS GAIN 1 WINDOW 48 X 72 IN, TYPE 2 , SHADED 52 .4 25 . 0 24 1257 600 2 WINDOWS 33 X 72 IN, TYPE 2 , SHADED 52 .4 25 . 0 33 1728 825 1 WINDOW 33 X 84 IN, TYPE 2 , SHADED 52 .4 25 . 0 19 1008 481 3 WINDOWS 36 X 36 IN, TYPE 2 , SHADED 52 .4 25 . 0 27 1414 675 CEILING UNDER VENTILATED ATTIC, R30 INS 3 . 0 1 . 6 655 1943 1048 WALL 37 X 9 FT, FRAME OR VENEER, R19 INSUL 5 .4 1 .7 230 1246 391 WALL 8 X 9 FT, FRAME OR VENEER, R19 INSULA 5 .4 1 . 7 72 390 122 ALLOWANCE FOR INFILTRATION, TIGHT CONST 10 . 8 1 . 1 655 7098 721 ALLOWANCE FOR LATENT HEAT 0 . 0 0 . 3 4863 0 1459 TOTAL REQUIRED CFM AND BTU HEAT LOSS/GAIN CFM LOSS GAIN CFM @ RECOMMENDED MAX VELOCITY OF 600 FPM 225 16084 6322 FOR FORCED AIR HEATING OR AIR CONDITIONING: REQUIRES : 2 BRANCH DUCT - (6 IN ROUND) OR (7 IN OVAL) OR (3-1/4 X 10 WALL STACK REQUIRES : 2 #661 14 X 4 SIDEWALL REGISTER OR 2 #411 4 X 12 FLOOR DIFFUSER OR REQUIRES : 2 #16 8 IN ROUND CEILING DIFFUSER OR 2 #24 6 X 6 INCH SQUARE DIFFUSER REQUIRES : 2 #650 10 X 6 INCH RETURN AIR GRILL FOR TWO 3-1/4 X 14 IN-WALL RETURN BED ROOM # 2 , SOUTH & EAST HEAT COOL AREA LOSS GAIN 1 WINDOW 48 X 60 IN, TYPE 2 , SHADED 52 .4 25 . 0 20 1047 500 CEILING UNDER VENTILATED ATTIC, R30 INS 3 . 0 1 . 6 195 579 312 WALL 11 X 9 FT, FRAME OR VENEER, R19 INSUL 5 .4 1 . 7 79 428 134 WALL 15 X 8 FT, FRAME OR VENEER, R19 INSUL 5 .4 1 . 7 120 650 204 ALLOWANCE FOR INFILTRATION, TIGHT CONST 10 . 8 1 . 1 195 2113 215 ALLOWANCE FOR LATENT HEAT 0 . 0 0 .3 1365 0 410 TOTAL REQUIRED CFM AND BTU HEAT LOSS/GAIN CFM LOSS GAIN CFM @ RECOMMENDED MAX VELOCITY OF 600 FPM 67 4817 1775 FOR FORCED AIR HEATING OR AIR CONDITIONING: REQUIRES : 1 BRANCH DUCT - (5 IN ROUND) OR (5 IN OVAL) OR (3-1/4 X 8 WALL STACK) REQUIRES : 1 #661 10 X 4 SIDEWALL REGISTER OR 1 #411 2-1/4 X14 FLOOR DIFFUSER OR REQUIRES : 1 #16 6 IN ROUND CEILING DIFFUSER OR 1 #24 6 X 6 INCH SQUARE DIFFUSER REQUIRES : 1 #650 10 X 6 INCH RETURN AIR GRILL FOR ONE 3-1/4 X 14 IN-WALL RETURN BATH MASTER, SOUTH HEAT COOL AREA LOSS GAIN EXHAUST FAN, 45 CFM WITH .50 USAGE 48 . 8 11 . 0 45 2194 495 CEILING UNDER VENTILATED ATTIC, R30 INS 3 . 0 1 . 6 140 415 224 WALL 15 X 8 FT, FRAME OR VENEER, R19 INSUL 5 .4 1 .7 120 650 204 ALLOWANCE FOR INFILTRATION, TIGHT CONST 10 . 8 1 . 1 140 1517 154 ALLOWANCE FOR LATENT HEAT 0 . 0 0 . 3 1077 0 323 ALLOWANCE FOR BATHROOM COMFORT 0 .2 0 . 0 4776 955 0 TOTAL REQUIRED CFM AND BTU HEAT LOSS/GAIN CFM LOSS GAIN CFM @ RECOMMENDED MAX VELOCITY OF 600 FPM 80 5731 1400 FOR FORCED AIR HEATING OR AIR CONDITIONING: REQUIRES : 1 BRANCH DUCT - (6 IN ROUND) OR (6 IN OVAL) OR (3-1/4 X 10 WALL STACK REQUIRES : 1 #661 12 X 4 SIDEWALL REGISTER OR 1 #411 4 X 10 FLOOR DIFFUSER OR REQUIRES : 1 #16 6 IN ROUND CEILING DIFFUSER OR 1 #24 6 X 6 INCH SQUARE DIFFUSER REQUIRES : 1 #650 10 X 6 INCH RETURN AIR GRILL FOR ONE 3-1/4 X 14 IN-WALL RETURN HALL # 1, NORTH HEAT COOL AREA LOSS GAIN 1 WINDOW 33 X 72 IN, TYPE 2 , SHADED 52 .4 16 . 0 17 864 264 CEILING UNDER VENTILATED ATTIC, R30 INS 3 . 0 1 . 6 30 89 48 WALL 9 X 9 FT, FRAME OR VENEER, R19 INSULA 5 .4 1 . 7 65 352 111 ALLOWANCE FOR INFILTRATION, TIGHT CONST 10 . 8 1 . 1 30 325 33 ALLOWANCE FOR LATENT HEAT 0 . 0 0 . 3 456 0 137 TOTAL REQUIRED CFM AND BTU HEAT LOSS/GAIN CFM LOSS GAIN CFM @ RECOMMENDED MAX VELOCITY OF 600 FPM 22 1630 593 FOR FORCED AIR HEATING OR AIR CONDITIONING: REQUIRES : 1 BRANCH DUCT - (5 IN ROUND) OR (5 IN OVAL) OR (3-1/4 X 8 WALL STACK) REQUIRES : 1 #661 6 X 4 SIDEWALL REGISTER OR 1 #411 2-1/4 X 10 FLOOR DIFFUSER OR REQUIRES : 1 #16 6 IN ROUND CEILING DIFFUSER OR 1 #24 6 X 6 INCH SQUARE DIFFUSER REQUIRES : 1 #650 10 X 6 INCH RETURN AIR GRILL FOR ONE 3-1/4 X 14 IN-WALL RETURN BED ROOM # 3 , SOUTH HEAT COOL AREA LOSS GAIN 2 WINDOWS 24 X 36 IN, TYPE 2 , SHADED 52 .4 25 . 0 12 628 300 1 WINDOW 48 X 60 IN, TYPE 2 , SHADED 52 .4 25 . 0 20 1047 500 SKYLIGHT, 45 DEG SLANT DOUBLE PANE 60 . 1 128 . 0 12 721 1536 CEILING UNDER VENTILATED ATTIC, R30 INS 3 . 0 1 . 6 344 1021 550 WALL 16 X 10 FT, FRAME OR VENEER, R19 INSU 5 .4 1 . 7 128 694 218 ALLOWANCE FOR INFILTRATION, TIGHT CONST 10 . 8 1 . 1 344 3728 378 ALLOWANCE FOR LATENT HEAT 0 . 0 0 . 3 3482 0 1045 TOTAL REQUIRED CFM AND BTU HEAT LOSS/GAIN CFM LOSS GAIN CFM @ RECOMMENDED MAX VELOCITY OF 600 FPM 153 7839 4527 , FOR FORCED AIR HEATING OR AIR CONDITIONING: REQUIRES : 2 BRANCH DUCT - (6 IN ROUND) OR (6 IN OVAL) OR (3-1/4 X 8 WALL STACK) REQUIRES : 2 #661 12 X 4 SIDEWALL REGISTER OR 2 #411 4 X 10 FLOOR DIFFUSER OR REQUIRES : 2 #16 6 IN ROUND CEILING DIFFUSER OR 2 #24 6 X 6 INCH SQUARE DIFFUSER REQUIRES : 1 #650 10 X 6 INCH RETURN AIR GRILL FOR ONE 3-1/4 X 14 IN-WALL RETURN WHOLE BUILDING ALLOWANCES HEAT COOL AREA BTU/HR BTU/HR GAIN FROM 5 PEOPLE, 0 . 0 5 . 0 330 0 1650 TOTAL REQUIRED CFM AND BTU HEAT LOSS/GAIN CFM LOSS GAIN CFM @ RECOMMENDED MAX VELOCITY OF 600 FPM 56 0 1650 SYSTEM DESIGN: REQUIRED SUPPLY TRUNK DUCT IS 20 X 8 REDUCED 2 INCHES EVERY 30 FEET REQUIRED RETURN TRUNK DUCT IS 22 X 8 REDUCED 2 INCHES EVERY 30 FEET IF CFM OF SELECTED AIR HANDLER IS GREATER THAN 800 INCREASE DUCT SIZE FOR HUMIDIFICATION SYSTEM TO MAINTAIN 356 RH AT 70 DEGREES : REQUIRED HUMIDIFIER TO HAVE AN EVAPORATIVE CAPACITY OF 7 GALLONS PER DAY GRAND TOTAL REQUIRED CFM AND TOTAL BTU HEAT LOSS/GAIN CFM LOSS GAIN CFM AT RECOMMENDED MAXIMUM TRUNK VELOCITY OF 1000 FPM 756 46343 19472 PREPARED 12/01/00, 15:01:09 DEPOSIT REFUND REPORT-UPDATE PAGE 1 PROGRAM MR415U Town of Vail r CUST-ID CUSTOMER NAME TYPE CHARGE DEPOSIT DEPOSIT-ADJ ADJUSTMENT AFTER-REFUND CODE DESCRIPTION TX-DATE AJ-DATE AMOUNT AMOUNT AMOUNT AMOUNT 2072 B00-0301 D2 DEPO8 DEPOSIT 11/02/00 12/01/00 250.00 250.00 250.00- .00 TOTAL FOR CUSTOMER TYPE: D2 250.00 250.00 250.00- .00 GRAND TOTAL: 250.00 250.00 250.00- .00 DEPOSIT COUNT: 1 G/L BATCH CREATED: BATCH-03208 2000/12 USERID-JPOPECK AP HELD COUNT- 1.00 AMOUNT- 250.00