Loading...
HomeMy WebLinkAboutDRB110524 PLANSDESIGN CRITERIA: 2558 AROSA DR. RETAINING WALL JOB #: 1204-17 FOUNDATION DESIGN: o. Foundation and retaining walls have been designed using on assumed lateral pressure of 45 pof plus surcharge for vehicular parking. b. A representative of the geotechnical engineer ahoU verify auUo conditions and types during excavation. Because geotechnioo| information was not ovoi|ob|o at the time of preparation of the construction documents, we have used assumed values boned on oirni|or sites in the area. Construction of the foundation may not proceed without verifying those values. Report any discrepancies from design assumptions to structural engineer for no—ovo|uotion of foundation design. C. BookfiU around and above structural buttresses and retaining woUa ahoU be compaction— tested per the recommendations of the gent*uhnicol engineer. d. Do not bookfiU against retaining wo||a until supporting elements are in p|000 and securely anchored, or adequate shoring is installed. Verify typo of fill with soils engineer and structural engineer prior to bookfiUing. GENERAL REQUIREMENTS: o. Structural erection and bracing: The structural drawings illustrate the completed structure with all elements in their final positions, properly supported and braced. The controctor, in the proper sequence, nhoU provide shoring and bracing as may be required during construction to achieve the final oornp|ntod structure. Contact structural engineer for consultation (not in contract) as required, b. Dimensions: Check all dimensions against architectural drawings prior to construction. Do not scale drawings. C. Construction practices: General contractor is responsible for means, methods, techniques, sequences and procedures for construction of this project. Notify structural engineer of omissions or conflicts between the working drawings and existing conditions. Coordinate requirements for rneohonico|/e|entrino|/n|urnbing penetrations through structural e|onnonta with structural engineer. Jobaite safety is the sole responsibility of the contractor. All methods used for construction oho|| be in 0000rdonoo with the latest editions of the |8C/iRC. d. Details not specifically shown on the drawings aho|| be constructed in o manner airni|or to the details that are shown for like conditions. These items oho|| be brought to the attention of the structural engineer as soon as possible for approval. Approval aho|| be obtained prior to installation. e. It is the responsibility of the contractor to contact the structural engineer at the appropriate time to perform site observation visits. Observation visits to the 'obn|te by the engineer are for determination of general conformance with the construction documents and ohoU not be construed as inspection. t Though every effort is rnodn to provide o complete and clear set of construction dnournonto, discrepancies or omissions may occur. Release of these drawings anticipates cooperation and continued communication between the contractor, architect and engineer to provide the best possible structure. These drawings have been prepared for the use of o qualified contractor experienced in the construction techniques and oyoterna depicted. SCALE: -3/4" = 1'-0" ZACKFILL PER GEOTECHNICAL ENGINEER Ir- DRAIN PIPE 6x6 TRTD. TIMBER, TYP. ISPIKES NOT SHOWN FOR CLARITY V. 1. F-OU-N D--A-TI-O-N--,-----,P LAN SCALE- 1144" = 1'-0" PLAN NOTES 1. ELEVATIONS OF FOUNDATION ELEMENTS INDICATED ON PLAN THUS: TO.W.=T0P OF WALL B.O.W.=BOTTOM OF WALL THESE ELEVATIONS RELATE TO 100'-0 AS A REFERENCE ELEVATION. 2. DO NOT SCALE DRAWINGS. ` � m SCALE %" = 1'-0" T.O.W. = 100'-0 B.O.W. = 81'-0 V-0 HORIZ. SPACING, TYP. � F�l -- N N � � G 9D� v".. ° ,,.� sheet Ln Co bt sheet I V' 0 h M- I 00 1 Wz _.bLr. —:- 0 � 1 �?oi • o y 4 _ I A. ®r ,•� ' APPPOVE0 •fig -� i �j,o - -- - - - - ' -- - - - --�- .. ............... . .. . .. ..._.__ `. - •• �,.- ... t.�pi-'LUUrJ I r, CULUF2App._.... TrI