HomeMy WebLinkAboutB12-0282 comment letter
Date: July 18, 2012
Re: 1498 Spring Hill Lane B12-0282
Dear Mr. Geyer
RESPONSE INSTRUCTIONS
● Submit three complete sets of revised construction documents containing
the requested information with all plan revision items clouded or otherwise identified.
● Please respond in writing to each comment with a response letter addressing each
comment.
BUILDING COMMENTS
Architectural Comments:
Sheet A2.1
1. Windows proposed to be relocated shall be required to comply with current energy code requirements to include a NFRC
label indicating a maximum .35 u value. Reference section 101.4.3 IECC. Revise general notes
2. Fifty percent of new lighting shall have to be high efficacy lighting. Reference section
404.1 IECC. Annotate on plans
3. Carbon Monoxide detectors required to be installed throughout. Annotate on plans
Structural Comments:
Reviewed and accepted
Plumbing Comments:
Please
clarify if elevator is to be electric or hydraulic operated. If hydraulic a elevator pit drain shall be required. Show on plans
Mechanical Comments:
1. Provide equipment plans and location
for elevator equipment
Electrical Comments:
1. Provide electrical plans and load calculations showing proposed additional loads as well as location of equipment, as referenced in architectural plans.
PLANNING
COMMENTS
Reviewed and accepted
FIRE COMMENTS
See Building comments
PUBLIC WORKS COMMENTS
NA
Sincerely,
Martin A. Haeberle
Chief Building Official