Loading...
HomeMy WebLinkAboutB12-0282 comment letter Date: July 18, 2012 Re: 1498 Spring Hill Lane B12-0282 Dear Mr. Geyer RESPONSE INSTRUCTIONS ● Submit three complete sets of revised construction documents containing the requested information with all plan revision items clouded or otherwise identified. ● Please respond in writing to each comment with a response letter addressing each comment. BUILDING COMMENTS Architectural Comments: Sheet A2.1 1. Windows proposed to be relocated shall be required to comply with current energy code requirements to include a NFRC label indicating a maximum .35 u value. Reference section 101.4.3 IECC. Revise general notes 2. Fifty percent of new lighting shall have to be high efficacy lighting. Reference section 404.1 IECC. Annotate on plans 3. Carbon Monoxide detectors required to be installed throughout. Annotate on plans Structural Comments: Reviewed and accepted Plumbing Comments: Please clarify if elevator is to be electric or hydraulic operated. If hydraulic a elevator pit drain shall be required. Show on plans Mechanical Comments: 1. Provide equipment plans and location for elevator equipment Electrical Comments: 1. Provide electrical plans and load calculations showing proposed additional loads as well as location of equipment, as referenced in architectural plans. PLANNING COMMENTS Reviewed and accepted FIRE COMMENTS See Building comments PUBLIC WORKS COMMENTS NA Sincerely, Martin A. Haeberle Chief Building Official