Loading...
HomeMy WebLinkAboutGLEN LYON LOT 13 LEGALo DIAM O U+ t3 fu,^t1m OI{D HOMES, fNC. March 6, 2000 Town of Vail 75 S. Fronage Road Vail, CO 81657 To Whom It May Concern: Please change our mailing address to: Diamond Homes, Inc. 3279 S. Santa Fe Dr. Englewood, CO 80110 Thank you. Sincerely, ru Edward Diamond President UdJ" 3379 SO. SANIAF:E DRIVE, ENGLEWOOD, COLORADO 80110, (308) 7894451 75 soulh tronlage rd. vall, colorado 81657 (303) 476-7000 department of community development November L9, 1982 Jim Guthrie Diamond Homes P.0. Box 1716 Englewood, Colorado 80150 Dear Mr. Guthrie: Enclosed you will find: I) Environmental Impact Analysis, Glen Lyon Subdivision. This is not regulation, just information. It describes the geoiogic hazards of Lot 13. II) Protective Covenants, Glen Lyon Subdivision. These covenants have been adopted as regu'lations by the Town. Note "Des'i gn Review Board" on p.4, "Hazards" on p.7, "Parking" and "Dwe1 ling Units" on p. 8 and "Land Use" on p. 2. III) The Primary Secondary Zone District. Note "setbacks" on p.323, underlined portion of "Density Control", p.324, "Site Coverage", "Landscaping", "Parkin9", p. 3248 and "Height", p. 324. IV) Definition of GRFA and Height. Note that height is measured from the highest point of a ridge down to existing or finished grade, Maximum Height: 33' . V) Natura'l Hazards study for Lot 14. You wi'll be required to submit a similar hazards study for Lot 13, and turn it in at the t'ime you apply for Design Review Board. Any qualified natural hazards professional engineer cou'l d be hired to write such a report. Before a building permit is issued you will be required to submit the engineering drawings of the duplex to the hazards engineer for review. The hazards engineer will then send a letter to the Town of Vai'l indicating that criteria outlined in the hazard report have been met in the engineering drawings. Page 2 VI) DRB Instructions. Meetings are first and third blednesdays of each month; dead'l ines are seventeen days before. Read "New Construction[ very carefully. All this will be required for Deslgn Review Board; also note materials list. This nust be fillad in comp'letely, down to color numbers and manufacturer name. This is most, but not all, the regulations concerning development on Lot 13. Have whoever does the architectural drawings to give ne a call when you get that far. Si ncerely, JS:df