Design Review Board
ACTION FORM
Department of Community Development
75 South Frontage Road, Vail, colorado 81657
tel: 970.479,2139 faxi97O.479.2452
web: www.vailgov.com
Project Name:
Project Description:
DRB Number: DRB070510
Final review of a minor alteration - White residence driveway - replace concrete with pavers
Participants:
Project Address:
Legal Description:
Parcel Number:
Comments:
OWNER WHITE, KENNETH L. & KATHRYN O9I24I2OO7
1833 LIONS RIDGE LOOP
VAIL
co 81657-4937
APPLICANT ROCKY MOUNTAIN STONESCAPES 0912412007 Phone: 303-668-6004
TOBY FLOYD
22977 HOPEDALE AVENUE
PARKER
co 80138
1883 LIONS RIDGE LP VAIL Location: Lot 4, Block 3, Lions Ridge Filing 3
Lot: 4 Block: 3 Subdivision: UON'S RIDGE SUBDIVISION
7103-122-0202-2
Motion By:
Second By:
Vote:
Conditions:
BOARD/sTAFF ACTION
Action: STAFFAPR
Date of Approvab 091?4 2007
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond:201
DRB approval shall not become valid for 20 days following the date of approval.
Cond: 202
Approval of this poect shall lapse and become void one (1) year following the date
of final approval, unless a building permit is issued and construction is commenced
and is diligently pursued toward completion.
Cond: CON0009416
Applicant shall be required to install a pan detail at the end of the driveway in
accordance with Town of Vail Desiqn Standards.
Cond: CON0009417
; "- " --;;il"i"iirpg,"a;l
E Expanded Features I 9 PDF Untimited pages
!
*C*91ap!e!e_-_ -.,bnt will be required to execute a revocable right-of-way permit with the Town
of Vail Public Works Depaftment prior to commencing any improvements within the
public way.
Planner: Scot Hunn DRB Fee Paid: t2O.00
Minor Exterior Alterations
Application for Design Review
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 97 0.479.2L28 faxi 970.479.2452
web: www.vailgov.com
General Information:
All projects requiring design review must receive approval prior to submitting a building permit application. Please
refer to the submittal requirements for the particular approval that is requested. An application for Design Review
cannot be accepted until all required information is received by the Community Development Department. The
project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission.
Deiign review approiral lapses unless a building permit is issued and construction commences within
one year of the approval.
U
N
tr
$
s s
Description of the Request!
Location ofthe Proposal: Lot:3 Subdivision:LrcaS [,sui-: Frurre 3 Ll Bbck:
PhysicalAddress: 1833 /ra^r Orsr^a la:P y'4tr , cn tl3S7
Parcel No,:2\D3\Z?-oZ6L"-(Contact Eagle Co. Assessor at 970-328-8640 for parcel no')
Zoning:
Name(s) of Owner(s):
Mailing Address: I
Owner(s) Signature(s):
Name of Applicant:
Maifing Address: ffiI1
E-mail Address:
Type of Review and Fee:
D Signs
tr Conceptual Review
tr New Construction tr Addition
Minor Alteration
(multi-family/commercial)
Minor Alteration
(single-family/duplex)
Changes to Approved Plans
Separation Request
$s0
No Fee
$6s0
$300
$2s0
kE
?<pes e-ho{,.,: \ , co r-..
Plus $1.00 per square foot of total sign area.
For construction of a new building or
For an addition where square footage is
commercial building (includes 250 additions & interior conversions).
For minor changes to buildings and site improvements, such as,
re-roofing, painting, window additions, landscaping, fences and
retaining walls, etc.
For minor changes to buildings and site improvements, such as,
re-roofing, painting, window additions, landscaping, fences and
retaining walls, etc.
$20 For revisions to plans already approved by Planning Staff or the
Design Review Board.
No Fee
F$fff*'jooU' checrno.:& By, kn M'+-
ueeting oate: 0r1f \?, ?rI? DRBN}.' Lreio7 O2/a
planner: project No.: 7f P7-O
sEP r 9 2007
Id.TOWN OF VAIL
C}
tr
X
tr
tr
MINOR EXTERIOR ALTERATIONS
TO BUILDINGS AND SITE IMPROVEMENTS
SUBMITTAL REQUIREM ENTS
General Information:
This application is required for proposals involving minor exterior alterations and/or site improvements.
Proposals to add landscaping do not require DRB approval unless they involve the addition of patios,
water features t gtading, or the addition of retaining walls.
I. SUBMITTAL REOUIREMENTS**
p- Stamped Topographic Surveyx
7[- Site and Grading Planx rQ Landscape Plan*o Architectural Elevations*
7!( Exterior color and material samples and specifications.
o - Architectural Floor Plansx o Lighting Plan* and Cut-sheet(s) for proposed fixtures o Title report, including Schedules A & B to verify ownership and easements*o Photos of the existing site and adjacent structures, where applicable.o Written approval from a condominium association, landlord, and joint owner, if applicable o Site-specific Geological Hazard Report, if applicable*u The Administrator and/or DRB may require the submission of additional plans, drawings,
specifications, samples and other materials (including a model) if deemed necessary to
determine whether a project will comply with Design Guidelines or if the intent of the
proposal is not clearly indicated.
Please submit three (3) copies of the materials noted with an asterisk (*).
xxFor interior conversions with no exterior changes, the submittal requirements include a complete set of
existing and proposed floor plans, a title report, and wriften approval from a condominium association,
landlord, and joint owner, if applicable.
I have read and understand the above listed submittal requirements:
Contractor Signature
oatesignea 9- /1.o7
F: \cdev\FORMS\Permits\PIanning\Old forms\drb_minor_alt_8-ZB-2007.doc Page 3 of 13
Topographic survey:. Wet stamp and signature of a licensed surveyor . Date of survey . North arrow and graphic bar scale . Scale of 1"=10' or L"=20'). Legal description and physical address . Lot size and buildable area (buildable area excludes red hazard avalanche, slopes greater than
40o/o, and floodplain)o Ties to existing benchmark, either USGS landmark or sewer invert. This information must be
clearly stated on the survey . Property boundaries to the nearest hundredth (.01) of a foot accuracy. Distances and bearings
and a basis of bearing must be shown. Show existing pins or monuments found and their
relationship to the established corner.. Show right of way and propefi lines; including bearings, distances and curve information.. Indicate all easements identified on the subdivision plat and recorded against the property as
indicated in the title report. List any easement restrictions.. Spot Elevations at the edge of asphalt, along the street frontage of the propefi at twenty-five
foot intervals (25'), and a minimum of one spot elevations on either side of the lot.. Topographic conditions at two foot contour intervals . Existing trees or groups of trees having trunks with diameters of 4" or more, as measured from a
point one foot above grade.. Rock outcroppings and other significant natural features (large boulders, intermittent streams,
etc. ).. All existing improvements (including foundation walls, roof overhangs, building overhangs, etc.).. Environmental Hazards (ie, rocKall, debris flow, avalanche, wetlands, floodplain, soils). Watercourse setbacks, if applicable (show centerline and edge of stream or creek in addition to
the required stream or creak setback). Show all utility meter locations, including any pedestals on site or in the right-of-way adjacent to
the site. Exact location of existing utility sources and proposed service lines from their source to
the structure. Utilities to include:. Cable TV Sewer Gas . Telephone Water Electric . Size and type of drainage culverts, swales, etc,. Adjacent roadways labeled and edge of asphalt for both sides of the roadway shown for a
minimum of 250' in either direction from property.
. Site and Grading Plan:. Scale of L"--20'or larger . Property and setback lines . Existing and proposed easements . Existing and proposed grades . Existing and proposed layout of buildings and other structures including decks, patios, fences and
walls, Indicate the foundation with a dashed line and the roof edge with a solid line.. All proposed roof ridge lines with proposed ridge elevations. Indicate existing and proposed
grades shown underneath all roof lines. This will be used to calculate building height.. Proposed driveways, including percent slope and spot elevations at the property line, garage slab
and as necessary along the centerline of the driveway to accurately reflect grade.. A 4' wide unheated concrete pan at the edge of asphalt for driveways that exit the street in an
uphill direction.. Locations of all utilities including existing sources and proposed service lines from sources to the
structures.. Proposed surface drainage on and off-site.. Location of landscaped areas.. Location of limits of disturbance fencing . Location of all required parking spaces
F:\cdev\FoRMs\Permits\Planning\Old forms\drb_minor_alt_8-28-2007.doc Page 4 of 13
Suruey/Site Plan Review Checklist
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 97 0.479.2128 f ax: 97 0.479.2452
web: www,vailgov.com
*This checklist must be submitted prior to Public Works review of a proposed development
Owners/Project Name:Ks^, (e)thrG-
Project Address:8/us-
Submittal
o Stamped survey of property
o Civil/Site plans
Survev Reouirements:
o Surveyor's wet stamp and signature o Date of survey o North arrow o Proper scale (1"=10' or l"=20)o Legal description o Basis of bearings / Benchmark o Spot Elevations
o Labeled right of way and property lines;
including bearings, distances and curye
information.o Lot Size o Buildable Area (excludes red hazard
avalanche, slopes greater than 40olo, and
floodplain)
o Landscape plan
o Title Report (Section B)
Environmental Hazards (ie. rockfall, debris
flow, avalanche, wetlands, floodplain, soils)
Watercourse setbacks (if applicable)
Trees
Labeled easements (i.e. drainage, utility,
pedestrian, etc...)
Topography
Utility locations
Adjacent roadways labeled and edge of
asphalt for both sides of the roadway shown
for a minimum of 250' in either direction
from property.
o
D
o
o
D
o
Site Plan Requirements:
I. Access (check all)o Driveway type and finished surface are shown on the site plan,
o Unheated o Heated (portion in ROW in a separate zone)o Snow storage areas are shown on the site plan within property boundaries (30olo of driveway area if
unheated; 10o/o of driveway area if heated)o All driveway grades, dimensions, radii are clearly noted on the site plan and conform to Development
Standards, p. 11. Steepest Section Driveway Grade (not the average grade):_o Parking spaces and turning radii are noted on site plan and conform to Development Standards,
pp.12&14
il. Construction Site (check all)a Location of all utilities and meter pits are shown on the site plan.
o Limits of disturbance construction fencing is shown on the site plan.
o I am aware that approved Staging and Construction Traffic Control Plans, as per the Manual of
Uniform Traffic Control Devices, will be necessary prior to construction.a I am aware that a Revocable Right of Way Permit will be required prior to construction.
F: \cdev\FORMS\Permits\Planning\Old forms\drb_minor_alt_8- 28-200/.doc Page 11 of 13
III. Drainage (check all that apply)
a The required Valley Pan is shown on the site plan as per Development Standards, p. 12.
o (Note: Valley pan must not be heated)o 4 Foot Concrete Pan o 8 Foot Concrete Pan
o Positive and adequate drainage is maintained at all times within the proposed site.
o Culvefts have been provided and are labeled and dimensioned on the site plan.
a A Hydraulic report has been provided. (As requested byTown Engineer)
ry. Erosion Control (Check all that apply)r Disturbance area is greater than one half acre,D A separate Erosion Control Plan has been professionally engineered and PE stamped.D Less than one half acre has been disturbed, and proper erosion control devices are shown on the site
plan.
V. Floodplain (check all that apply)o The project lies within or adjacent to a 100 year Floodplain.o 100 year Floodplain is shown on the site plan.
o A Floodplain study has been provided. (Required if floodplain is within construction limits or as
requested by Town Engineer)a The project does not lie within or adjacent to a 100 year Floodplain
VI. Geological/Environmental Hazards (check all that apply)u The project lies within a Geologi{Environmental Hazard area. (See Development Standards, p. 20)
o A Hazard Report has been provided
u The project does not lie within a Geologic/Environmental Hazard area.
VII. Grading (check all that apply)tr Existing and proposed grades/contours are provided on the site plan.
o All disturbed areas have been returned to a 2:1 grade,
n All disturbed areas not returned to 2:l grade have been Professionally Engineered with slope
protection and/or stable soils. PE stamped details are provided within plans.
o Only existing contours are shown on the site plan, there is no proposed grading.
VIII. Parking (check all)o All residential and commercial parking spaces conform to the Development Standards, pp, 12&15.
IX. Retaining Walls (check all that apply)o All retaining walls conform to the standards in the Development Standards, p. 19,o All retaining walls and combination walls over 4 feet have been Professionally Engineered and a PE
stamped detail has been provided within the plans.
o All retaining walls are shown on the site plan, with labeled top and bottom of wall elevations and type
of wall construction,a No retaining walls are required for this project.
X. Sight Distance (check all that apply)o Proper sight distance has been attained and shown on site plan as per Development Standards, p.12.
oPropersightdistancehasnotbeenattained'Exp|anationwhy:-
Additional Comments
Please provide any additional comments that pertain to Public Works Review.
Applicants Signature
F: \cdev\FORMS\Permits\Planning\Old forms\drb_minor_alt_8-28-2007.doc Page 12 of 13
I Gardon Stone Wall
A Garden Stone Wall System will enhance the overall value of
your property and cost less to maintain than other types of walls.
Garden Stone Wall Units offer a natural, textured stone appearance and are
constructed with hig h-compression concrete that resists cracking and insect
infestation. Other benefits of the Garden Stone Wall Units include a tight fit
and a ma intena nce-free, environmentally-friendly system that doesn't require
painting or treating with chemicals.
\tailaltlr'(iolols:
Enhance the beauty of your property with simple do-it-
yourself projects. Garden Stone Wall Units are lightweight
and have unique, recessed "hand-holds" that make them
easy to carry. Walls can be built three feet high and do not
require mortar for construction. Unlike treated lumoer or
railroad ties, the Garden Stone Wall Units will not rot, split or
warp, providing you with an attractive wall for years to come.
(larrlen Stone \\all
Size 12" x 8" x 4"
Weight per unit: 25 lbs
Bronze Metallic
Granite City
u utl
lot lllr)r'( rlr'l.lilr'(l ( r)lrll
r)lllirns. sr,i. l)irS|s ilil- i'l
Page l- of l-
Scot Hunn - White Residence DRB Approval - Town of Vail
From: Scot Hunn
To: rockymountainstonescapes@hotmail.com
Date: 09127/2007 4:31 PM
Subject: White Residence DRB Approval - Town of Vail
CC: Scot Hunn
Attachments: Scot Hunn
Toby,
Attached please find a PDF copy of the DRB 'Action Form' for your records. This form contains any conditions of
approval which you will be responsible for completing.
Of note, please contact George Charlberg at the Town of Vail Public Works Department at (970) 477-3507 to
coordinate execution of a revocable right-of-way permit for any improvements within the public way.
Also, as we discussed on the phone today, please ensure that you install a pan detail at the end of the driveway
per the Town of Vail design standards.
Lastly, please be advised that this staff approval will be forwarded to the Town of Vail DRB at their regular
meeting of October 17 , 2007 for ratification. Although this is a routine approval and Staff sees no design
related issues relative to your application, please be advised that approval does not become valid until 20 days
following final approval.
Please feel free to contact me at (970) 477-355L if you have any questions regarding this staff approval or any
conditions of approval.
Scot Hunn, AICP
Senior Planner
Town of Vail
(970) 477-3551 Office
(97O) 479-24s2
shu n n@vailgov.com
file://c:\oocuments and settings\Administrator\Local se. . . 09/27/2007
,r*m
Design Review Board
ACTION FORM
Department of Community Development
75 South Frontage Road, Vail, Cnlorado 81657
teli 970.479.2139 fax'. 970.479.2452
web: www.ci.vail.co.us
Proiect Name! White Residence DRB Number: DRB010107
Project Description:
split-rail fence
Participants:
OWNER WHITE, KENNETH L. & KATHRYN 04/30/2001 Phone:
1833 LIONS RIDGE LOOP
VAIL CO
81657-4937
License:
APPLICANT WHITE, KENNETH L. & KATHRYN 04/30/2001 Phone:
1833 LIONS RIDGE LOOP
VAIL CO
8L657-4937
License:
Project Address: 1883 LIONS RIDGE LP VAIL Location:
Legal Description: Lot: 4 Btockr 3 Subdivision: UON'S RIDGE SUBDIVISION 4
Parcef Number: 210312202022
Comments:
BOARD/STAFF ACTION
Motion By: Action: STAFFAPR
Second By:Vote: Date ofApproval: 04/30/2001
Conditions:
Cond: B
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the Desiqn Review Board.
Planner: Allison Ochs DRB Fee Paid: $2O.OO
o o
' ', . : i.:: '
1
.J
'F>- '
t'€,'1.3-
. -"{it : ..'\- Ei'-et b \'.
t r'<
Questions? Cln" Planning Staff at 479-2138
Tt)I{\i APPLICATION FOR DESIGN REVIEW APPROVAL
GENERAL INFORMATION
This application is for any project requiring Design Review approval. Any project requiring design review musr
receive Design Review approval prior to submitting for a building permit. For specific information, see the submittal
requirements for the particular approval that is requested. The application cannot be accepted until all the required
information is submitted. The project may also need to be reviewed by the Town Council and/or the Planning and
Environmental Commission. Design Review Board approval expires one year after final approval unless
a building permit is issued and is started.
I
\-t-A.r.'.\ Q"",* on \1.,.
..\
-)
B.
I
D.
E.
F.
G.
LOCAION OF pROpOSAl, LOT: A BLOCK: 3 nLrruC, L,tS ()ol \i..)o. ]
\Q11 \ \ \ O PHYSICAL noonrss: \t3J Lr ,.,".., c', tr .n Lo,.t' o
PARCEL * TT3|WLD3Z , (Contact rastSco. Assessop office at 97p-3za-8640 for parcet #)\J {^*\-, \; 5 rs.,.'.}.- t6*\-, h oo*t
NAME OF OWNER(S):
L."
owNER(S) STGNATURE(S):
NAME OF APPLICANT:
H.TYPE OF REVIEW AND FEEI
New Construction - $200 Construction of a new building.
Addition - $50 Includes any addition where square footage is added to any
residential or commercial building.
Minor Alteration - $20 Includes minor changes to buildings and site improvements, such
as, reroofing, painting, window additions, landscaping, fences and
retaining walls, etc.
DRB fees are to be paid at the time of submittal. Later, when applying for a building permit, please identify
the accurate valuaton ofthe project. TheTown of Vail will adjust the fee according to the project valuation.
PLEASE SUBMIT THIS APPLICATION, AKL SUBMITTAL REQUIREMENTS
AND THE FEE TO THE DEPARTMENT OF COMMUNITY DEVELOPMENT,
75 SOUTH FRONTAGE ROAD, VAIL, COLORADO 81657.
tr
tr
X
itr:
, r,:. lt
,J it
'l
1
ll'i r.
. r': 1... ;:,l i
I /,.'if
\1fi
f
a\
$.-t r'-,
b
ttur}
Questions? Cln" Planning Staff at 479-2138
Tt)I{\i APPLICATION FOR DESIGN REVIEW APPROVAL
GENERAL INFORMATION
This application is for any project requiring Design Review approval. Any project requiring design review musr
receive Design Review approval prior to submitting for a building permit. For specific information, see the submittal
requirements for the particular approval that is requested. The application cannot be accepted until all the required
information is submitted. The project may also need to be reviewed by the Town Council and/or the Planning and
Environmental Commission. Design Review Board approval expires one year after final approval unless
a building permit is issued and is started.
I
\-t-A.r.'.\ Q"",* on \1.,.
..\
-)
B.
I
D.
E.
F.
G.
LOCAION OF pROpOSAl, LOT: A BLOCK: 3 nLrruC, L,tS ()ol \i..)o. ]
\Q11 \ \ \ O PHYSICAL noonrss: \t3J Lr ,.,".., c', tr .n Lo,.t' o
PARCEL * TT3|WLD3Z , (Contact rastSco. Assessop office at 97p-3za-8640 for parcet #)\J {^*\-, \; 5 rs.,.'.}.- t6*\-, h oo*t
NAME OF OWNER(S):
L."
owNER(S) STGNATURE(S):
NAME OF APPLICANT:
H.TYPE OF REVIEW AND FEEI
New Construction - $200 Construction of a new building.
Addition - $50 Includes any addition where square footage is added to any
residential or commercial building.
Minor Alteration - $20 Includes minor changes to buildings and site improvements, such
as, reroofing, painting, window additions, landscaping, fences and
retaining walls, etc.
DRB fees are to be paid at the time of submittal. Later, when applying for a building permit, please identify
the accurate valuaton ofthe project. TheTown of Vail will adjust the fee according to the project valuation.
PLEASE SUBMIT THIS APPLICATION, AKL SUBMITTAL REQUIREMENTS
AND THE FEE TO THE DEPARTMENT OF COMMUNITY DEVELOPMENT,
75 SOUTH FRONTAGE ROAD, VAIL, COLORADO 81657.
tr
tr
X
Depaftment of C ommunity Deve lopment
75 South Frontage Road
Yail, Colorado 81657
970-479-21 38
FAX 970-479-2452
www.ci.vail.co.us
JOINT PROPERTY OWNER
WRITTEN A.PPROVAL LETTER
a joint owncr ofproperry located at
(print name)
(addresVlegal description)
provide this letter as
which are submined to the Town wri ffen approval of the plans dated
of Vail Community Development for the proposed improvements to be completed at the address
above. I understand that the proposed improvements include
I t-urther understand that minor modifications maybe made to the plans over the course of the
review process to ensure compliance with the Town's appiicable codes and regulations.
(srgnature)
{g *n*"^ro
(date)
Questions? Call
o
the Planning StafF at 479-2138
MINOR ALTEMTIONS TO THE EXTERIOR OF BUILDINGS
AND SITE IMPROVEMENTS
GENEML INFORMATION
This application applies to changes made to a site or exterior alterations of a building. Any
alteration in which additional building square footage is added will require an "additions"
application.
I. SUBMITTAL REOUIREMENTS
tl Photos or sketches which clearlv convey the existing conditions.
fl Photos or sketches which clearlv convey the proposed building or site alteration(s).
n Al relevant speciFications for the proposal including colors and materials to be
used.
! Condominium Association approval (if applicable).
n If the intent of the proposal is not clearly indicated, the Administrator may
determine that additional materials are necessary for the review of the application.
O-O
BUILDING MATERIALS:TYPE OF MATERIAL:COLOR:
Roof
Siding
Other Wall Materials
Fascia
Soffits
Windows
Window Trim
Doors
Door Trim
Hand or Deck Rails
Flues
Flashing
Chimneys
Trash Enclosures
Greenhouses
Retaining Walls
brterior Lighting
t--Other f srs.. c-
* Please specify the manufacturer=s color, number and attach a small color chip
** All s<terior lighting must meet the Town=s Lighting Ordinance 12-11-5J. If ocerior lighting b pmposed,
please indicate the number of fixtures and locations on a separate lighting plan. Identify each fi<ture type
and provide the height above grade, lumens output, luminous area, and attach a cut sheet of the lighting
frxtures.
o
PROPOSED I.ANDSCAPIIIIG
Botanical Name: Common Name: Ouantitv: Size*:
'l )-3"PROPOSED
TREES AND
SHRUBS:
E(ISNNG TREES
TO BE
REMOVED:
*Minimum requirements for landscaping: deciduous trees - 2 inch caliper
coniferous trees - 6 feet in height
shrubs - 5 oallons
fipe:Souare Footaoe:
GROUND COVER
soD
SEED
IRRIGATION
TYPE OF EROSION
CONTROL
OTHER LANDSCAPE FEATURES (retaining walls, fences, swimming pools, etc.) Please specify. Indicate top
and bottom elevations of retaining walls. Maximum height of walls within the front setback is 3 feet.
Maximum height of walls elsewhere on the property is 6 feet.
UTILITY LOCATION VERIFICATION
This form is to verify seryice availability and location for new construction and should be used in
conjunction with preparing your utility plan and scheduling installations, The location and availability of
utilities, whether they be main trunk lines or proposed lines, must be approved and verified by the
following utilities for the accompanying site plan.
Authorized Sionature Date
U.S. West Communications
1-800-922-1987
468-6860 or 949-4530
Public Service Company
949-5781 (Gary Hall)
Holy Cross Electric Assoc.
949-5892 Cfed Husky;John Boyd)
T.C.I.
949-5530 (Floyd Salzar)
Eagle River Water
& Sanitation District *
476-7480 (Fred Haslee)
x Please bring a site plan, floor plan, and elevations when obtaining Upper Eagle Valley Water &
Sanitation signatures. Fire flow needs must be addressed.
NOTES:
1. If the utility verification form has signatures from each of the utility companies, and no comments
are made directly on the form, the Town will presume that there are no problems and the
development can proceed.
2. If a utility company has concems with the proposed construction, the utlity representawe shall note
directly on the utility verification form that there is a problern which needs b be resolved. The issue
should then be detailed in an attached letter to the Town of Vail. However, please keep in mind
that it is the responsibility of the utility company and the applicant to resolve identified problems.
3. These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit
from the hpartment of Public Works at the Town of Vail. Utiliw locations must be obtained before
diqqino in any public right-of-way or easement within the Town of Vail. A buildino oermit is not a
Public Wav oermit and must be obtained seoaratelv.
il.
ilI.
ry.
PRE-APPLICATION CONFERENCE
A pre-application conference with Town of Vail staff is required. No application can be accepted
unless the mandatory pre-application meeting has been completed. It is the applicant=s
responsibility to schedule this meeting by calling 970-479-2128.
TIME REOUiREMENTS
The Design Review Board meets on the 1st and 3rd Wednesdays of each month. A complete
application form and all accompanying material must be accepted by the Community Development
Department a minimum of three and a half (3 1/2) weeK prior to the date of the DRB public
hearing.
REVIEW CRMRIA
Your proposal will be reviewed for compliance with the Design Guidelines as set forth in Section 12-
1l of the Municipal Code.
NOTE TO ALL APPLICANTS:
A. If a propefi is located in a mapped hazard area (i.e. snow avalanche, rocKall, floodplain,
debris flow, wetland, etc), a hazard study must be submitted and the owner must sign an
affidavit recognizing the hazard report prior to the issuance of a building permit. Applicanb
are encouraged to check with the planning staff prior to submittal of a DRB application to
determine the relationship of the property to all mapped hazards.
B. Easic Plan Sheet Format. For all surveys, site plans, landscape plans and other site
improvements plans, all of the following must be shown.
1. Plan sheet size must be 24"x36". For large projects, larger plan size may be
allowed.2. Scale. The minimum scale is 1"=20'. All plans must be at the same scale.3, Graphic bar scale.4, North arrow.5. litle bloc( project name, project address and legal description.6. Indication of plan preparer, address and phone number.7. Dates of original plan preparation and all revision dates.8. Vicinity map or location map at a scale of 1"=1,000' or larger.
9. Sheet labels and numbers.10. A border with a minimum left side margin of 1.5".11, Names of all adjacent roadways.72. Plan legend.
C. For new construction and additions, the applicant must stake and tape the project site to
indicate property lines, proposed buildings and building corners. All trees to be removed
must be taped. The applicant must ensure that staking done during the winter is not
buried by snow. All site tapings and staking must be completed prior to the day
of the DRB meeting.
D. Applicants who fail to appear before the Design Review Board on their scheduled meeting
date and who have not asked in advance that discussion on their item be postponed, will
have their items removed from the DRB aqenda until such time as the item has been
reoublished.
E. If the DRB approves the application with conditions or modifications, all conditions of
approval must be resolved prior to the issuance of a building permit.
STAFF APPROVAL
The Administrator may review and approve Design Review applications, approve with certain modifications,
deny the application, or may refer the application to the Design Review Board for decision. All staff
approvals are subject to final approval by the DRB. The following types of Design Review applications may
be staff approved:
A. Any application for an addition to an existing building that is consistent with the architectural design,
materials and colors of the building, and approval has been received by an authorized member of
a condominium association, if applicable;
B. Any application to modify an e)(isting building that does not signifrcantly change the existing planes
of the building and is generally consistent with the architectural design, materials and colors of the
building, including, but not limited to exterior building finish materiab (e.9. stoneworK siding, roof
materials, paint or stain,), exterior lighting, canopies or awnings, fences, antennas, satellite dishes,
windows, skylights, siding, minor commercial facade improvemenE, and other similar modfications;
C. Any application for site improvemenE or modifications including, but not limited to, driveway
modifications, site grading, site walls, removal or modifications to existing landscaping, installation
of accessory structures or recreational facilities,
ADDMONAL REVIEW AND FEES
A, ff this application requires a separate rwiew by any local, state or Federal agency other than the
Town of Vail, the application fee shall be increased by $200.00. Examples of such review, may
include, but are not limited to: Colorado DeparEnent of Highway Access Permits, Army Corps of
Engineers 404, etc.
B. The applicant shall be responsible for paying any publbhing fees which are in excess of 50% of the
application fee. If, at the applicant's request, any matter is postponed for hearing, causing the
matter to be re-published, then the entire fee for such re-publication shall be paid by the applicant,
C. Applications deemed by the Community Development Department to have design, land use or other
issues which may have a significant impact on the community may require review by consultants
in addition to Town staff. Should a determination be made by the Town staff that an outside
consultant is needed, the Community Development Department may hire the consuftant. The
Department shall estimate the amount of money necessary to pay the consultant and thb amount
shall be forwarded to the Town by the applicant at the time of filing an application. Expenses
incurred by the Town in excess of the amount forwarded by the application shall be paid to the
Town by the applicant within 30 days of notification by the Town. Any excess funds will be retumed
to the applicant upon review completion.
a
UJ
UJ
LL
L
=E.
LIJ
o-
ot/
o
uJ
z
2
=f
d)
.d
o z z
I
I
t_
,F ca l<o\lo
I il
I, t
=l
I
g
F
E
a z
=o
z z
)
u.
z
J
o.t N
N
(r
UJ z 3
tr./
I F
o z
H a
z
F-l
o)
o)
0)
G a ='o,
'F
q)
o
!)o o c (E'
.g
-c_
c (!
o !
c
=f
E
=c l ;
o
o
3
.9
0)
'=O(o;(J t-:
E3E;
F s n3 it g s
cfIc
.9 UP O c-o>e:5i :gPd a.: 'r ; >=:
d5;:,-,; > 5 ii: dN iSE",*ooc
iEoS .:ePf
F!f",.Y= tEi
o- (6 0--o:- o (g P O-oiE-or
- (D- r-
=EEo
sc(J=oro!'"2;H 9 :=l--!:::.=
9i9: ::'sq: =c, I;!I I>=
:a:9 ;n )-'-xvE ;'ieE 9E-o -;cou)i h x=
rn
F
=E
IJJ
z
o
=l
(D
z
co
l
I z
I O
UJ Iu
z
tr
lu E
E
E
;uJ ;
c z
6
o
F
o-
UJ o o l
z
(J
U)
u.J
IJ-J
tJ.
E
qJ
)
F
F
-e F Q
UJ
z 6
=
z
o I f,
NO[VnlVA
z
H
ah
d
Fl H
E
fr
.l
z H a
=z
t
=
z
tr
a ()
o
lJ.l z
C'
>d
-r(')
zz oo
io- A
rY -aa z:>OO Qz r!<
r.r.: ?o-Y
E
o-
E
'
a o o
z
tr
E
F
'K a
3
t-u z
(,
4
(I
0-
," 4)2+P
FQ
1\.)
cD
ct
*d)
O(:
'(l5
o
r.-
|..-
|..-
I o\-+
I
p.,,
I *l :l
I
I
=.1 (rl r!l
5l
<l >l
u-l ol
2l
3l pl
FI
4
F-]
Fl
Fr
tr
=l (9l
url
:l
al >l
rr-l ol
zl ]l
9l
ft
aJ)
r4
z
H
cn Fl
t.L
z.
z
J
L!
I
I
J
t-.1
F ()
I
I ol ;l
D<l
^l
I
I
d
u-rl
n I
=t
&
.l H
z
=
tr
I {1 I TI
a6 I
-ol
=l ol
UJI
:I
al >l
xl
zl ;l pl
z
I F
N
ll tl II II l'l ttl lo, l l-rl l-'rl ul ol -. 1 zl etl Fr I (91 (JI UJI 5t 1l Hl al t>l Ql ,.1
ot -l tzl !=l
I
I
I
I
ol 2l
ol url il
=l <l >l
6l Zt ..;3t :Ol ttJ FI F
F
LU F
T
<F
u-.J <ZE
L!F (n Z o
c)
E
F z
)
9 E F
i.JJ
J
uJ
zl
=s ]F
-JZ
E.
F
E
z
O z
r
LlJ
gi
\JZ z
B
z
\J-ze
coO >z
OL!
J ."i5 vv=
=r3
cod>
F
uJ
o-
E?E<
oy2 ot->o
vd:
=>-Ei1 F
EF>OU^.o:i::
-H^L tr :.e @ I- r,,
E XO-r x>.o;F
o-:t-
Lll !!
(_)
F
--EiixlL r
Nl
-()l *l rl
^^l N{
\QE
=
uJ
a.)
c\l
&*g
r+
a
1
uJ F
o
uJ
=U)
o -)
z
F
u,l Y
UJ
d)
F t
uJ (L
IL
o-
I
LrJ F
z
E
=E
LlJ
o-z 9 F o f E F U'z o ()
\
\.
\
rlli
)
I 'I \
75 soulh |rontage road
Yail, colorado 81657
(3031 479-2L38 ot 479-2t39
TO:
FROM:
DATE:
SUBJECT:
ofllce ol communlty development
ALL CONTRACTORS CURRENTLYL REGISTERED WITH THE
TOWN OF VA]L
TOWN OF VArL puBlrc woRKs/coMMUNITy DEVELOPMENT
I{ARCH 16, 1988
CONSTRUCTION PARKING & MATERIAL STORAGE
the Town of you for your
rn summary, ordinance No. G states that it is unlawful for anv person to litter, track or deposit any soil , rock, sand, aeuris or naterial, including trash durnpster-, poriable ioileti -.ra -
workrnen vehicles upon any street, sidewalk, a11ey or public pt?g. or any portion thereof. The right-oi-way -on aII Town of vat.t. streets and l9ads is approxinately 5 ft. off pavernent.This ordinance wilr be stri-Lry enforcid by the iown of vail pylli: works Departnent. persons found vilratinf tnir-o.Jii".,".r./rrr be glven a 24 hour written notice to remove said material .rn the event the person so notified does not comply with the notice lrithin the 24 hour tirne specified, the pulric works Department wi1l, remove said rnaterial at i,he expense of person notified- The provisions of this ordinance srrirr not be appricable to construction, naintenance or repair projects of any street or all_ey or any utilities in the rlght_a_way.
To review ordinance No. G in ful1, please stop by Vail Building Department to obtain a copy. thank cooperation on this rnatter.
cknowledged
Contractor
October 27, 1993
Date
BUILDING PERIiIT ISSUANCE TIME FMNE
If this permit. requires a Town of Vail Fire Department Approval ,Engineer''s. (.Pyb.l i9 t'Jot ks) review and approval ,'a planning' Department review or Health Department review, and'a review by the guitbing
Department, the estimated time for a total review may take as l6ng as three weeks.
All commercial (1arge or sma'll ) and al'l mu]ti-family permits will have tq follow the above mentioned maximum requiremLnts. Resident.ial and.small projects_should take a lesser amount of time. However, if residential or smaller projects impact the various above mentioned
departments. with regard to necessary review, these projects may also take the three week period.
Every attempt will be made by this department to expedite th.i s permit as soon as possible.
!, tne undersigned, understand the p1 an check procedure and time frame.
75 soulh lrontege road
u.ll. colo?edo 81657
(303) 479-2138 ot 479-2\39
White Residence
Project Name
October 27 , 1993
Date Work Sheet was turned into the
Communi ty Development Department.
olflcc ot communlty devclopmenl
LETTEB OF CREDIT FORMAT
Dale of Exorralion:
5 /ta/ .t/z
THIS AGREEMENT{ Fade and entered into this lD day ot MnV . rg}5 Oy
and among Kt\ \f\ ** (hereinpfterpallqd the "Developer"), and lhe TOWN
OF VAIL (hereinafter called the 'Town") anO Vo,.\ {5o..,..,L (hereinaftei calied lhe "Bank").
l.l
a condition of approval ot tne k/ hr tt
wishes to enter into a Developer lmprovement
WHEREAS, the
DEVELOPER IMPROVEMENT AG REEMENT
Developer, as
_, 19_,plans, dated
Agreement;and
WHEREAS, the Developer is obligated to provide security or collaleral sufficient in the
judgment of the Town to make reasonable provisions for completion of certain improvements
set forth below; and
WHEREAS, the Developer wishes to provide collateral to guarantee performance of
this Agreement, including construction of the above-referenced improvements by means of the
followino:
Developer aSlggs to Qstablish a letter of credit with a Bank in Eagle County in a dollar
amount ot $-\5t'9) (25% ot the total cost of the work shown below) to provide
security for the following:
IMPROVEMENT
/t- d,.^e,T
*f.,y -IJ Lr.-z(
Now, THEREFORE, in consideration of the following mutual covenants and
agreements, the Developer and the Town agree as follows:
1. The Developer agrees, at its sole cost and expenses, to furnish all equipment
1!9qateriat,nece.qsary to perform and complete all improvements, on or before I folleMlru 4l?41. The Devetoper shail complele, in a good workmanlike manner, all
lmprovements as listed above, in accordance with all plans and specifications filed in the
office of the community Development Department, the Town of Vail, and to do all work
incidental thereto according to and in compliance with lhe following:
a. Such other designs, drawings, maps, specifications, sketches, and olher matter
submitted by the Developer to be approved by any of the above-referenced
governmental entities. All said work shall be done under the inspection of, and
to the satislaction of, the Town Engineer, the Town Building Official, or other
offieial from lhe Town or Vail, as affected by special districts or senrlce distr.icts,
as their respective interest may appear, and shall not be deemed complete until
approved and accepted as completed by the Town of Vail Community
Development Department and public Works Department.
2- To secure and guarantee performance of its obligations as set forth herein, the
Developer agrees to provide security and collateral as follows:
Page l of 3
3. The Developer may at any time substitute the collateral originally set forth
above for anolher form ot collateral acceptable to the Town to guarantee the laithful
completion of those improvements referred to herein and the performance of the terms of this
Agreement. Such acceptance by the Town of alternative collateral shall be at the Town's sole
discretion.
4. The Town shall not, nor shall any officer or employee thereof, be liable or
responsible for any accident, loss or damage happening or occuning to the work specified in
this Agreement prior to the completion and acceptance of the same, nor shall the Town, nor
any officer or employee thereof, be liable for any persons or property injured by reason of lhe
nature of said work, but all of said liabilities shall and are hereby assumed by the Developer.
The Developer hereby agrees to indemnify and hold harmless the Town, and any of its
officers, agents and employees against any losses, claims, damages, or liabilities to which the
Town or any of its officers, agents or employees may become subject to, insofar as any such
losses, claims, damages or liabilities (or actions in respect thereof) that arise out of or are
based upon any performance by the Developer hereunder; and the Developer shall reimburse
the Town for any and all legal or other expenses reasonably incurred by the Town in
connection with investigating or defending any such loss, claim, damage, liability or action.
This indemnity provision shall be in addition to any other liability wnicn tne Developer may
have.
5. lt is mutually agreed that the Developer may apply to the Town and the Town
shall authorize for partial release of the collateral deposited with the Town for each category
of improvement at such time as such improvements are constructed in compliance with Al -
plans and specifications as referenced hereunder and accepted by the Town. Under no
condition will the amount of the collateral that is being held be reduced below the amount
necessary to complete such improvements.
6. lf the Town determines, at its sole discretion, that any of the improvements
contemplated hereunder are not constructed in compliance with the plans and specifications
set forth in this Agreement on or before the date set lorth in Paragraph 2, the Town may, but
shall not be required to, redeem the letter of credit as necessary fo complete the unfinished
improvements. The Bank shall release such lunds upon written request from the Town stating
that the improvements have not been completed as required by this agreement. The Bank
shall not require the concurrence of the developer prior to releise of l[e lunds to the Town
nor shall the Bank be required to verify independenlly that such improvements have not been
completed as required by this agreement, bul shall release such lunds solely upon the Town's
written request.
lf the costs of completing the work exceed lhe amount of the deposit, lhe excess,
together with interest attwelve percenl per annum, shall be a lien against the property and
may be collected by civil suit or may be certified to the treasurer of Eagle County'to be collected in the same manner as delinquent ad valorem taxes levied against such property. lf
the permit holder fails or refuses to complete the cleanup and landscaping, as defined in ihis
chapter, such failure or refusal shall be considered a violation of the Zoning code.
7. The Developer warrants all work and material for a period of one year after acceplance of all work referred to in this Agreement by the Town ii such work is located on Town of Vail property or within Town of Vail rlgnt-ot-way pursuant to Section 17.16.250.
. I The parties hereto mutually agree that this Agreement may be amended 1.om time to time, provided that such amendments be in writing ind executed by all parties hereto.
lrrevpcable letter of credit #VaiL QanElnamed
/y-S in the amount ot $__l r:_5gz:_ witn
improvements set forth above
bank in Eagle County) as the security for the
if there is a default under the Agreement by Developer.
Dated the day and year first above written.
Page 2 of 3
I
STATE OF COLOHADO
COUNTY OF EAGLE
acknowledsed before me tn"Jkv.,VAr- .
a
BANK
19_ by
The foreqoing Develooer lmorovement Agreemenl was acknowledgecl hnfore me this _ da;, of
Witness my hand and official seal.
My commission expires:
The foreg \W.t-", P:W\Z."^""-- ^*.**.before me rr,i' l-f-puv ot
wfiness my hanct and oJticial seal. /
Mycommission .*rn"r,CVrh 1 /?? tr
/U' .'
STATE OF COLORADO
COUNry OF EAGLE
My commission expires:
STATE OF COLORADO
COUNTY OF EAGLE
, COMMUNITY DEVELOPMENT
my hand and official seal.
Updrr.d 928,{4
Notary Public
Page 3 ol 3
4$
V:\IL BANK
Effective Date:
Expiration Date:
Number:
Town of Vail
Vail, CO 81657
IRREVOCABLE LETTER OF CREDIT
May 10, 1995
May 10, 1996
175
Re:Kenneth L. White
Lot 4, Block 3, Lionsridge
1833 Lionsridge Loop
Vail, Colorado 81657
Subdivision, Filing No. 3
Gentlemen:
We hereby open our lrrevocable Letter of Credit in your favor, available to you by draft
or drafts at sight drawn on the Vail Bank for any sum or sums not exceeding in total
of sum of Seventeen Thousand Five Hundred and No/100 Dollars ($17,5O0.0O).
This Letter of Credit is for the account of Kenneth L. White.
Funds under this credit are available to the Town of Vail by its sight draft(s) on us
referring to this Letter of Credit by number and by its issuance date. Such draft(s)
must be received by Vail Bank prior to 4:00 p.m. on May 10, 1996. The funds
available under this letter of credit shall be for completion of paving, landscaping and
rock wall modif ication f or the above ref erenced project. Such authorized
representative of the Town of Vail indicating that the amount drawn is necessary to
complete the aforementioned items.
Vail Bank agrees with the drawers, endorsers and bonafide holders of drafts drawn and
negotiated in compliance with the terms of this Letter of Credit that such drafts will
be duly honored upon due presentation at the counter of this Bank.
Vail Bank represents and warrants to the Town of Vail that it has the full authority and
power to issue this Letter of Credit to the Town of Vail, in the total amount and for
the total period of time stated herein; said authority being pursuant to the laws of the
United States, or the state or territory which governs the establishment and regulation
of Vail Bank, and Vail Bank's charter, by-laws, and other applicable rules and
\r,rl ll.inl FLrri,lil:: ii.i:. rrlr l:r.,|'r:. ii,,.r,i\\,-r \'r: .Ll,,l,rri,,.llr:; r.'i-i,r,.-1r,.'i i:.\\ i,'l'-11r.-lt,r,r.
llllir. rr1,lr,,nt.r-. ii,,.r,1 \\'.'t \.ril,t,'1,,r r.lL, \11..; j.'ll, ;i.'.r l\\ r.'rr+'n ili
tr.rli Ii.;r,:lll.rr[ li, r.l .\,, r). ( ,,],,r.r.1, \i/,1.\ lrrl.)+'r:.) ): l.'i.l+.,;\\l
,1.{-{ ll,lr irr,., i LrL.,j\.r., r',,1,,rr.1, \.':.r-' i\.i ',)i liii I \\ l,'l t.',.' \:+l
Letter of Credit No. 175
Page 2
regulations adopted pursuant thereto. Should it be necessary for the Town of Vail to
file suit in an effort to enforce this lrrevocable Letter of Credit, Vail Bank hereby
waives all venue rights and submits to the jurisdiction of the District Court in and for
the County of Eagle, State of Colorado.
All drafts hereunder must be drawn on or before May 1O, 1996.
Sincerely,
Vail Bank
Dan Godec, Vice President
,t
Proposal
FROM Big Timber Landscaping
P.O. Box 2322
Glenwood Sprgs. Co. 8L6O2-2322
( 303 ) 945-6037
Proposol No.
Sheef No.
Dqte 5/5/95
Proposol Submified To Work To Be Performed At
Nome Mr- Ken White Straet 1833 lionsridoe looo
Street P. O. Box 894 Citv--Vall Srore Co.Ciry Vail
Stote Co.
Dole of Plons
Architeci
Telephone Number ( 303 ) 476-4597
We hereby proPose to furnish qll lhe moteriols ond perform oll the loliror necessdry for the completion of Plantinq 26 low qrowinq iuniper, 25 Aspen trees 1L in. ealliper, g 5qal
12 Da Li1 3 Alpine Cqrrant, And one 6ft. Spruce Tree.Also install L?OeL. of lawn edqinq and 2,000 sq. ft. of reedblock
Then put donn 15 yds. of Aspen mulch and also lay 850 sq.ft. of sod vith vi 1d round th inder of the 1ot
dollars her then nkler stem the bid 11 be $2,700.00 th
All moteriol is guoronteed to be qs specified, ond the obove work to be performed in qccordonce with
cnd speciffcotions submitted for obove work ond completed in o substontiol workmonlike monner for
Dollors($ 7,1gg.40
the
the drowings
of
t.
with payments to be mode os followsr
The sum of $5,688.40 to be paid on date proposal is accepted. And the bal-ance of $1,500.00 when work is completed. There vill be an 18% annual of intrest on unpaid balance after 30 days
Any olterotion or devioiion from obove specificotions involving €xtro costs, will be executbd only upon written orders, ond will
become dn extro chorge over ond obove lhe estimote. All ogreements coniingent upon slrikes, occidents or deloyr beyond our
ccnlrol. Owner to ccfry fire, tcrncdo snd other necesscr/ insurqnce upon cbove work. Workmen's Compensotion ond P'lblic
Liobility lnsuronce on obove work to be token ouf by Ri g Ti mher T.ands ing
Respectfully subm
Per Ri g Ti rnher T,andsr.aF l ng
Note - Thir proposol moy be withdrown by us if not occepted within doys
ACCEPTANCE OF PROPOSAT
The obove prices, specificotions and conditions ore solisfoctory ond ore hereby accepted. You ore outhorized to do the work or
speciffed. Poyneni will be mode os outlined qbove.
Acceoterl Sianahra
ToFs FoRM s4!o @ Y
LITHO tt{ U. A. A.
sPEKr+rrffi-
TEII{S fiO SrDtnO|{A . Ac{ouA:r^F_{. ed Fq,abbriih gt d{ri ot t f,ict dna. OvorduE ffilj:.Ttr i.}!5t-s ''ro-cttary' of |to.m pe, tnd'r$ wrtitd;rnilfil?H
'*',.,,o""n0,,*actuu{i$ rew sd ro dr a qruy ibrctt€dion. d,*"r;i ir"rifi rill ii "'lil"i"r r*.
@;--"
T I E6. 80 AU].I
fr*S.ttt-- 4Bl-
P.O. Box 6g0
Eci/vords, Cdorodo 116$2 h.ttlf r 471-13t9
GtW, t 47l{.7tl
YqTAL INE
l-) ij 'l
'*
.x.
I0'd 800'oN FZ:18166F610f : 0I Ad0f ,\d03
CONSTRUCTION, INC.
Spnergot
0057 Edwards Acc€ss Road
P.O. Box 1176
Edwards, Colorado 81632 (303) s26-s41 1 . FAX (3O3) 926-546s
Proposal
Page I
PROPOSAL SUBMITTED TO:
Job Name & Address:
Ken IIhite
P.O. Box 894 Yail. Colo. 81658
ATTN: Ken
llhite Residence Driveway
Dats ot Plans:
W6 hereby propos€:
1. ) Prepare subgrade for roadbase and paving; subgrade to be left at * or - 0.1' by excavating contractor.
2.', Furnish and place 4" of 314" of roadbase to cover approximately 2,648 SF of area for new asphalt driveway.
3. ) Apply soil sterilant to prepared roadbase.
4. ) Furnish and plaee 3t' of new asphalt paving to cover sane area of approximately 2,648 SF.
'i
J
,u I
All ol the above wo|k lo be completsd in a substantial and workmanlike mannor lor tha sum ot Six Thousand and no dollars
**$6000.0o **
IMPORTANT: The loms and conditions stated on th€ reverso sid€ her€ol are €xpressly made a part ol this contract. This proposalshall noi becoms a binding
contract unlessand untillh6 Accepianc€ of Proposaland Confimation by Contractor on the r6v6rs€ sid€ have bssn execuled. This proposallmust be acc€ptsd
as provided and delivered to Elam Gonstruction, Inc.,
'To accept thls propo'sal, ploaso slgn back ol
whhe copy and r€turn to Elam Constructlon,
Inc. Elam Constructlon, Inc. shall not be
bound heruln to executo a contract unless tha
owner provldes eatlsiactory cvldence of ad-
oguate flnenclng.
FomlA@(xl
-30- days fron abovo date, or 6hall expire.
t5-' ,
Respectfully submitted
ELAM CONSTBUCTION. INC.
TERMS AND CONDITIONS"
The contract amount is payable to Elam Construction, Inc. monthly for work as it progresses with the entire
;, _.qa!-q!,qe due upon. gornple.tircn unless otherwise provided in this contract or in the plans and -siredflintions. Unleids'dthdiriirise specified herein, the plans and specifications, if any are expressly
made a part of lhis contract. The contractor shall perform all of the work in a substantial and
/Eclgt)1{[P flri,'lq$iTrf/n,afco{$ance with the terms of the plans and specifiqrfig?Fr ns;t
Additional work or changes may be ordered in writing by the customer aqr5r61rg",l"tfu$ii8".op$51or "t the contracto/s regular rates for the time and material work. ') ('
rrsX : II'TTA
lf payments for work are not made when due, the contractor may stop work or terminate this contract and
recover from the cuslomer payment for all work executed and any loss sustained and reasonable profit and
damages. lt is hereby mutually agreed that the contractor shall not be held responsible or liable for any loss,
d3msse, liquidated damases or delay causqd ? fii-";,i$h?;, gi', il, T",111?t1|h?1y gj.,Td ,o{t?'"qr:?bb9dndtfdc8rltrott,i,,:r(rr'? t:il.:;l:,?:1,,.,
*,, i tt,..t,.,tg t.,i | ,, _ r,, + ,r,
A. late charge of 187" per annum on the. gutstanding helanqe rpay [,e.imposed upgn all past.due payments..
v
'':dub{bhi5?d$}6USrdiAiHrrbotst3ofL6ffitil{dai\orL9sonidrtatdornei5ted'irtrrbtcCullRtegCdrl6SU{iinq{reni and is referred for COlleCtiOn.. (.tr'ta t ,'tlt J lr,rl(i"b .vell r(-) I r;'r t}; Jcr 7( ttaOr!
It the customer disposes of the'lda?d&&B ty bAa UHaneWvBd, t{e,fui 5rhAdfi dnial,rtndJ'ff1fo on{tni!
contract becomes due at once and payable.within forty-eight (48)t becomes due at once and payable.within fofty-eight (48
,L t,a 'la) \/(lr) () I .grri'it;1 I lsrlqai -rv,rir lo contract becomi:,i?i,,"tsf",'l?l nf'rrTl?lii:o;:lgitt+ft hqvrs.,lifllit?,iJ,"fi11':'o',Tt' ( . +
The contractor agrees to carry Workman's ctRrpErisatid; a*ditrld#liaui$'llrsurhAcf 'Al0 ro pay
all sales laxes, old age benefit and unemployment compensation taxes upon the material and labor
fumished under this contract, as required by the United States of America and the State in which
this work is performed.
ACCEPTANCE OF PROPOSAL
The prices, specifications, terms and conditions stated above and on the reverse side hereof are
satisfactory and are hereby accepted. By this acceptance, I understand that a binding contract has
been created when confirmed by Elam Construction, Inc.
ACCEPTED
Dale Signature
Signature
CONFIRMATION by CONTRACTOR
ELAM CoNsfflUCt'rbit.1tri6. hrrr, L,.rr,r.rrr,ri | .. t c.
Date
'rsgsrrsM ssrA - reJa'rof nriT
by
Iror: Iir Eogle - Bogle Engineering at fflour IfiXl here)
To: fiandu Johnson - [J Builders it UZS5
09-06-9{ lZ:1? pr
002 of 002
Boylc Engineering, lnc.
143 E. Meadow Drivc, Suite 39o
vail, Colorado EI657
3031416-2110 FA)( 303/476-4383
September6, 1994
Rudy Johnron
R J. hrilders
P.O. Bor 5553
Veil, Coloredo El55t
Subj ect: White Residencc
Lions Ridge Lnop
Vail, Colorado
DearRandy:
This is to confirm lhat I have apprcved the substitution of Grade 60 #5 vertical reinforcing spaced at 12"
on ce tcr for thc #6 rcinforcing ryaccd at 16" o/c originally specified in the foudatton walls for the
above notcd drplcx.
Pleasc givc mc a call if you have any qucstions or conrmts on lhis malter.
Since,rcly yours,
BOYLE ENGINEERING. INC.
TimothyM. Boyle, P.E.
hesident
li- ,,lr t I
tt,.(l;
TAi;
::5
st
Boyle Engineering, Inc.
143 E. Meadow Drive, Suite 390
Vail, Colorado 81657
3o3 | 47 6-217 0 F A\X 303 147 64383
September 19, 1994
Dan Stanick
TOWN OX'VAIL BUILDING DEPT.
75 S. Frontage Road West
Vail, Colorado 81657
Subject: White Rcsidence
Lions Ridge Loop
Vail, Colorado
Dear Dan:
This is to confirm our recent telephone conversation regarding the reinforcing steel in the tall foundation
wall at the above noted residence. My memo dated September 6 covered the substitution of #5 @ 12"
o.c. vertical steel for the #6 @ 16" o.c. originally spccified. Per our discussion, the horizontal steel
requirements for these walls should be 2#5 top and boftom and a total of l0 tl4 horizontal bars in
between.
Please give me a call if you have any questions or comments on this matter.
cc: R.J. Builders
ffi}'''"'ltt-Fi 14ocE ii;
,, A "s.*; ,
ffii*t&
r r). ! i\l!_rrl ,\l \_/ n.l
Fr',:rlr; ilr', i, Wackr.rii,'
Sttbject: lVhrte Rcsidelcc - 18-?3 Lir-rcrsridge Loo'r
! t'.'"'r 1!:e t-rirpeit).,.ltijacr:rr tr'' ilrr tvltitr F-rsidencr at 183-q
i ion-ririi,r- i :rorr. VIr, Vhite haS aSSr:red rne thtt ire rvi!! have the r.ock
'.-'.'Ail , witich elt,:l'1 aCheS ,:tt the west Lrorlndg1,r.,,. g1 tly pr.ir;rggr.r, r.ernif'.'t-.d 1J1.,
Jr-rne 9. 1Qq5,
NS*,-
K. L. white
Acknowledgement
" Dr. J. Wackerlv
\f o
Hnpwonrx-Pewrex G
June 1, 1994
R.J. Builders
Attn: Randy Johnson
2077 North Frontage Road
Vail. Colorado 81657
EorEcHNIcAr, INc.5020 Road '154
Glenwood Spnngs, CO 81601
Fax 303 945-8454
Phone 303 945-7988
Job No. 194 179
Subject:Subsoil Study tbr Foundation Design, Proposed Ken White Residence,
Lot 4, Block 3, Filing 3, Lion's Ridge Subdivision, Lion's Ridge Loop,
Vail. Colorado.
Dear Mr. Jobnson:
As requested, Hepworth-Pawlak Geotechnical, Inc. performed a subsoil study for
design of foundations at the subject site. The study was initiated as an observation of
excavation in accordance with our agreement for geotechnical engineering services to
R.J. Builders dated March 30, 1994 and later amended to include an explorarory
boring. The data obtained and our recommendations based on the proposed
construction and subsurface conditions encountered are Dresented in this reoort.
Proposed Construction: The proposed residence will be a 3 story structure with a
basement level. Ground floors will be slab-on-grade and strucural above crawl space.
Cut depths are extensive and range between about 4 to 6 feet in the middle lower part to
about 15 to 20 feet along the back side. Foundation loadings for this rype of
construction are assumed to be relatively light to moderate.
Ifbuilding conditions or foundation loadings are significantly different tiom those
described above, we should be notified to reevaluate the recommendations presented in
this report.
Site Conditions: The building site is located below Lion's Ridge which is a prominent
sandstone outcrop. The area is impacted by potential rockfall and we understand that
mitigation has been designed by others. The ground surface slope is moderate to sreep
down to the south with about 15 feet of elevation difference across the buildins site.
When we observed the excavation on March 31 several cut levels had been made
berween about 4 to 20 feet deep. We understand that the excavation had been made
about 5 weeks prior to our observation. The bottom was still wet and soft in some
areas from recent snowmelt. Most of the excavation material appeared to have been
removed tiom the site except for a stockpile along the front and a pile of large boulders
apparently encountered during excavation.
Subsurface Conditions: The subsurface conditions at the site were evaluated by
observing the soils exposed in the excavation and by drilling 1 boring in the southwest
pan of the excavation. The log of the boring is presented on Fig. 1. The subsoils
exposed in the excavation and to a depth of about 15 feet in the boring consist mainly of
R.J. Builders
June 1, 1994
Page 2
silty to clayey sand with local clay and gravelly zones. The soils appear to be of lower
density in the excavation, and higher density with depth. Results of swell-consolidation
testing perforrned on relatively "ndisturbed samples ofthe sands and clays, presented
on Figs. 2 and 3, indicate low to moderate compressibility under conditiors of loading
and wetting. Results of a gradation analysis perfonned on a sample of the more
gravelly soil (minus 1 1/2-inch fraction) obtained from the excavation are presented on
Fig. 4. No free water was observed in the boring at the time of drilling and the soils
were slighfly moist to moist.
Foundation Recommendations: Considering the subsoil conditiors observed in the
excavation and encountered in the exploratory boring and the nature of the proposed
construction, we recommend spread footings placed on the undisturbed natural soil
designed for an allowable soil bearing pressure of 2,000 psf for support of the
proposed residence. Settlements are expected to be about I inch which could be
differential and occur after construction. Footings should be a minimum width of
16 inches for continuous walls and 2 feet for columns. Loose and disturbed soils and
any backfill encountered at the foundation bearing level within the excavation should be
removed and the footing bearing level extended down to the undisturbed natural soils.
The exposed subgrade should be compacted. Exterior footings should be provided with
adequate cover above their bearing elevations for frost protection. Placement of
footings at least 48 inches below the exterior grade is typically used in this area.
Continuous foundation walls should be reinforced top and bottom to span local
anomalies such as by assuming an unsupported length of at least 12 fert. Additional
reinforcement may be warranted at steps in grade. Foundation walls acting as retaining
structures should be designed to resist a lateral earth pressure based on an equivalent
fluid unit weight of at least 45 pcf for the on-site soil as bacldill. The loading on the
uphill back wall could be about 60 pcf equivalent fluid weight due to surcharge from the
steep backslope.
Floor Slabs: The natural on-site soils are suitable to support lightly loaded
slab-on-grade construction. To reduce the effects of some differentiai movement, non-
structural floor slabs should be separated from all bearing walls and columns with
expansion joints which allow unrestrained vertical movement. Floor slab control joints
should be used to reduce damage due to shrinkage cracking. The requirements for joint
spacing and slab reinforcement should be established by the designer based on
experience and the intended slab use. A minimum 4-inch layer of freedraining gravel
should be placed beneath basement level slabs to facilitate drainage. This material
should consist of minus 2-inch aggregate with less .han 50% passing rhe No. 4 sieve
and less than2% passing the No. 200 sieve.
H-P GEoTECH
R.J. Builders
June 1, 1994
Page 3
All fill materials for support of floor slabs should be compacted to at least 95% of
maximum standard Proctor densiry at a moisture content neiu optimum. Required frll
can consist of the on-site soils devoid of vegetation, topsoil and oversized rock.
Underdrain System: Although free water was not encountered during our exploration,
it has been our experience in mountainous areas that local perched groundwater may
develop during times of healry precipitation or seasonal mnoff. Frozen ground during
spring runoif can create a perched condition. We recommend below grade
construction, such as retaining walls, crawl space and basement areas, be protected
fiom wening and hydrostatic pressure buildup by an underdrain system.
The drains should consist of drainpipe piaced in the bottom of the wall backfill
surrounded above the invert level with free-draining granular material. The drain
should be placed at each level of excavation and at least I foot below lowest adjacent
finish grade and sloped at a minimum 1% to a suitable gravity outlet. Free-draining
granular material used in the underdrain system should contain less than 2% passing the
No. 200 sieve, less than 50% passing the No. 4 sieve and have a maximum size of
2 inches. The drain gravel backfill should be at least I 1i2 feet deep.
Surface Drainage: The following drainage precautions should be observed during
construction and maintained at all times atter the residence has been comoleted:
Inundation of the tbundation excavations and underslab areas should be avoided
during construction.
Exterior backfill should be adjusted to near optimum moisture and compacted to
at least 95% of the maximum standard Proctor density in pavement and slab
areas and to at least 90% of the maximum standard Proctor density in landscape
areas. Free-draining wall backfill should be capped with at least 2 feet of the
on-site, finer graded soils to reduce surface water infiltradon.
The ground surface surrounding the exterior ofthe building should be sloped to
drain away from the foundation in all directions. We recommend a minimum
slope of 12 inches in the first l0 feet in unpaved areas and a minimum slope of
3 inches in the first 10 feet in pavement and walkway areas. A swale will be
needed uphill to direct surface runoff around the residence.
Roof dowrspouts and drains should discharge well beyond the limits of all
backtlll.
L)
?\
3)
4)
H-P GEoTECH
R.J. Builders
June 1, 1994
Page 4
Limitations: This report has been prepared in accordance with generally accepted
geotechnical engineering principles and practices in this area'at this time. We make no
other warranty either expressed or implied. The conclusions and recommendations
submitted in this report are based upon the data obtained from the excavation
observation and the exploratory boring drilled at the location indicated on Fig. 1, the
proposed type of construction and our experience in the area. Our findings include
interpolation and extrapolation ofthe subsurface conditions identified at the site. If
conditions encountered during construction differ from those described in this report,
we should be notified at once so re+valuation of the recommendations may be made.
This report has been prepared for the exclusive use by our client for design purposes.
We are not resporsible for technical interpretatiors by others of our information. As
the project evolves, we should provide continued consultation and field services during
construction to review and monitor the implementation of our recommendations, and to
verifii that the recommendations have been appropriately interpreted. Significant design
changes may require additional analysis or modifications to the recommendations
presented herein.
If you have any questions or if we may be of further assistance, please call our office.
Sincerely,
HEPWORTH - PAWLAK GEOTECHNICAL, INC.
Reviewed By:
,&'*tCc
Daniel E. Hardin, P.E.
cc: Boyle Engineering - Attn: Tim Boyle
SLP/ro
Attachments
ffik;"4d 'vlb,steu;:x4
W:W =o'{*; 153zz,l
Aol,l?YEi
€-Tftc$&
Steven L. Pawlak,
H-P GEorEcH
HEPWORTH-PAWLAK GEOTECHNICAL, INC.
LOG OF EXPLORATORY HOLE
Job No: 194 179
Datum: Ground Surface Prepared By: SLP, H-P Geotech, Inc. Date: 05/1 1/94
Reviewed By: DEH, H-P Geotech, Inc. Date: 05124194
Drilling Equipment: CME 45 Track Mounted Drill Rig
Boring No: 1 Elevation:
Location: Near Center
Existing Cut Grade
of Garage Area.
Depth,Ft.Visual
Class.
Description of
Material
1t2
1tr 1t2 22 1t2
22 1t2 2rl
5
10
20
Fitl
CL
JL.\]L-
SC
ca/al
/-l
Loose backfill or disturbed on-site
sand clay.
Sand; clayey, silty, gravelly, medium
dense, slightly moist, brown, low
plasticity.
Clay; sandy, very stiff, moist, brown,
slightly calcareous, low plasticity.
Sand, Gravel and Cobbles; silty to
clayey, possible boulders, dense,
morst, brown.
Bottom of Boring @ 30 feet
No free water
Sam ples:
2" diameter California Drive N = 21
2" diameter California Drive N = 29
2" diameter California Drive N:22
2" diameter California Drive N = 19
Notes:
1. The exploratory Boring was drilled
May 1 1, 1994 with a 4-inch diameter
continuous flight power auger.
2. The exploratory boring was located
approximately in the middle of the garage
area excavatton.
3. Elevation of the exploratory boring
was not measured and the loo is drawn
to deoth.
4. The exploratory boring location and
elevation should be considered accurate
only to the degree implied by the method
used.
5. The lines between materials shown on
the exploratory boring log represent the
approximate boundaries between material
types and transitions may be gradual.
6. No free water was encountered in the
boring at the time of drilling. Fluctuations
in water Ievel mav occur with time
Fig. 1
0
N
1
q
9?
4
I
*,*.,r" conJii= ZO -Z perceni
Ory Unrt wergnr = 10q oc:
Sampre oi: Very Sandy C I ay
From: middle levei
-l *l ts-j \ -'=>
\I I
l
I ---'Compression
Upon l^lett i ng I
\\
APDI-JED PFESSUFE _ Ksi
Vorsture C.:nt:nt = 18.3 re.cent
lr,/ Unrr ',vercrr . 105 )c;
Samore of: Vefy C l ayey Sand
;rom: Uppef east Ievel
No Movement
Upon lJett inq
iitlll li
*
a
(-)
APPLJED PRESSURE _ Ksf
194 179 HEPWORTH-PAWI.AK
GEOTECHNICAL. Inc.SWELL-CONSO LI DATI ON TEST RESULTS
a N
c
tn/
(L)
o-
,-<
Morsture Content =
Ory Untt Wetgnr =
Sampte of: Clayey Sand
From:Boringl@10
3.9 percenr
11q
feet
-l
I
-j-1., I lr:
\
\
.-t
I
-. Ccmpression
Upon l,lett i ng
\
:ii
rl li irii,tlr,li rlliil lli,ii
i.u io
APor_.Ei 2FESSUPE - ksr
vorsrure conrenr = 13-6 petcant
lrv Unrt 'A/ergnt = 1 '1 9 :c:
samore of: clayey Sand
-:'orn: g6pi1'19 1 G 15 feet
;€
c
c)
o (-)
Irlo llcvement
Upon \iett ing
APol-iED PFIESSURE - ksf
HEPWOFirH.PAWI.AK 1qa 17q | -'^-;--;tr'+ ttr I GEOTECHNICAL, lnc.SWEI.L.CONSO LIDATI ON TEST R ESU LTS FtE. J
0
2a hfl 7 HL.urN r 5 tl$a. tn:Mll{. l9 Mrn. ! ulL. t raa,!|_
CLAY iO SIL;
OIAMETEF OF PANTICLE IN MILLIMETEFS
OLAS;iC:TY !NOE( 8
i' N€
GaAvE!- 39 5 sANo 27 eb srLT ANO C-rY 34 .t
Lrouro L:M|T lh
sAMPLE cFC I ayey Sand and qravel FFoM upper Ievel
I TYCROME:=i iNAL/SIS I StgrE.iNALYStS I
I ;D.€ aEAOTNG3 I J.S, jiANOARO SEFTeS I aL:.A,r SCiJaRE ,J?SN|NGS I z.H€ iHft | .,^ | I
15MfN 15MtN. tO Mtaa rgutN.rMIt. I Mtfa. ':!o 'rtlo ':O .ro':O ..a ig 'r .r- ',- 1v,- :- :-5-
rcl)
a
.44 ?3
OIAMFE'I OF PARTTCLE !N MILLIM€TEiIS
cl-1Y TO S|LT
GAAV€L
LIOUID LTMIT
SAMPLE OF
$ SILT ANO CL{Y
PIJS?ICITY INOE(
FFOT'
aoG
HEFrrrtoRTH - PAwl-AK
GEotEcnmtcaL r"".I "n' o GRADATION TEST RESULTS 194 179
atF
o9
(E
U'
o
g
o
(E o
ct
!
o
o
o
(E .t
c,
l9
€
o
c,
o tt,
q)
o
E
'F =36=.=aai o5F
a
E
a
fl F
3x^o;:P {=-E-
@
_9 1-lEn C',.|
2t5,.,r
X;N;F3e;<ir
cr)@
2 I
o
f;s N c{
l$o,(t
i9E
z
o,o,to
-r gF
tr224 <oo z=o
o,
ct
@
ct
c{
C\|
(f)
z
a
|ll
=
FE
OF
r!o
EE gd
IIJ
0)
o
ct
g
ut
o o
uJ
o)(|'z
o)F
s o)
.i z
-)
2?J dfr 0()E
='-Ea (JPJ
uJ F\O'E lJl - .)(, u.t tr
m-{
= aF l- rJ J'6
=1 +h I F rr
o B=o-Hd
0
lbwn of Vail
OFFIOF CC)PY
t ItL
'IOWn Ot Var I
25 South Frontage Road Vail, Colorado 81657 (303) 4'79-2t38
P lan review based on the 1991 Uniform Buildinq Code
Name: WHITE RESIDENCE
Date: November 8, 1993
Occupancy: R3rM1
Type of Const: V-N
Address: 1833 LIONSRIDGE LOOP
Contract.or: RJ BUILDERS
ArchiIecT: AGUILAR
Engineer: T. BOYLE
Pl-ans Examiner: CHUCK FELDMANN
--i------- ------;ii;,;;;;;;;i-;;;;-il-;;-;;-;il;;-;;-;;-------
requirements of the latest National- Electrical Code,all Town of Vail Ordinanees, and Holy Cross
Requirements.
2 This project will require a slte j-mprovement survey.This survey sha1l be submitted and staff approved prior to a request for a frame inspection. Under no circumstances wifl a frame inspection be done without an approved site j-mprovement survey.
3 Exterior surfaces with stucco shall be provided with exterior metal lath as per UBC 4706 with 2 layers of paper. Windows and doors are required to be
adequateLy flashed(not with just screed metal) . A lath inspection is required prior stucco application.
4 A11 new construction within the Town of Vail- will- be required to have an initial inspection by TOV Publ-ic
Works Dept. to approve site drainage and cuLvert j-nstalIation. This approval must be complete prior to any inspection by the nuilding Department.
5 This project is restricted from the nurninglf wood in fireplaces. Unless the lot is a restricted lot in size, three gas logs fireplaces and three gas
appliances are permitted per unit atl-owed. Gas J-pg
chimneys enclosures shall be one hr. protected.
6 In bathrooms with a tub or shower and in laundry
rooms a mechanical ventilation system connected directly to the outside shall be provided. Bathrms which contain only a water cl_oset or Lav. may be ventj-1ated with a recirculating fan. UBC 1205(c) .
t
'7
10
11
Domestic clothes dryer exhaust ducts shalL be j-nstalled as per UMC 1104 and 1903. Fl-exible duct connectors may not exceed 6' in length and shal-l- not be concealed within constructlon. Ducts shal-],terminate outside the buildinq and not exceed 14,
l-engt.h.
No domest,ic dishwashi-ng machine shalf be directly
connected to a drainage system without the use of an
approved dishwasher air-gap fitting. UPC 608.
Cross connection cont.rol- devices shall be inst.alf ed to protect pollution of potabl-e water supply by use of approved backflow prevention devices- UPC 1003.
Plumbing fixtures with mechanical apparatus shall be supplied with an access panel for inspectj-on and renair of ecrr:i nment. UPC 904.
Domestic ranges shal-I have a vertical cfearance
above the cookj-ngr surface of not less than 30" to unprotected combustibl-e material . UMC 1901.
Heating and cooling equipment focated in the garage
shaLl be installed with the pilots and burners or heating elements and switches at least 18" above the fl-oor l-evel of the sarase. UMC 508.
Approved gas logs may be installed in solid-fuel burning fireplaces provided the install-ation is
according to the listing instructions, any damper shall- be removed or permanent Iy blocked, and a safety shutoff vafve is provided. UMC 803.
Gas fireplace appliances are required to be
i nsta l l ed as oer 'l i st i no i nsl-a l I:tion instructions -with a 'Brr vent onl-y. Combuslion air must be supplied from the outside for all new construction
i-n the Town of Vai1.
Supply a mechanical- drawing indicating design of system, size (BTU and volume) of equipment, vent location and termination, and combustion air to be
crrrrrr'l i arl nril.\r l-^ +n,, I^^+-l I ^+.i ^,-J any ].nsLal. _Lat l on .
Due to Colorado State Statutes, all sink faucetts
and shower heads are required to utilize flow restriction devices. AIso, the maximum water cl-oset flush usaqe is limited Lo a maximum of 3.5 gatlons per f1ush.
The enclosed usabLe space under the stairs is
rprrrri red tn ba nrotFct cl^l hv thr fife-feSiStive I/rvLvvuvs vj construction. -- 3306. (1)
L2
13
t4
15
IO
11
Id At eaves and valleys an adequate underlayment shall-be provided to protect a structure from ice buildup
and water damage. Two layers of felt solid mopped to sheathing and between layers or a coftunercial water & ice shield may be used as per Table 328L.
Because of this project's location, the foundation 1s required to be dampproofed to prevent damage to areas below finished grade. UBC 1707(d).
The struct.ure is requj-red to be anchored to the
foundataion with 1/2 inch anchor bolts. The bolts
must be into the concrete or masonry 7 inches and
spaced a maximum of 6 feet apart. See code for additional requirements. -- Sec . 290'l . (t)
Include a copy of the soils report for the site to be built on. -- Sec. 2905.
19
20
2I
o o
NOTE:The code items listed in this report listing of all possible code requiremlnts selected sections of t.he code.
Town of Vail
Town of Vail 25 South Frontage Road Vai1, Colorado 81657 (303) 479-2t38
Plan analysis based on the 1991 Uniform Building Code
NAMe: WHITE RESIDENCE Date: November 8, 1993
Occupancy: R3, Mi.
Type of ConsL: V-N
FL NA}4E
,
0
Address: 1833 LIONSRIDGE LOOP ConIracIor: RJ BUTLDERS Architect: AGUfLAR Engineer: T. BOYLE Plans Examiner: cHUcK FELDMANN
are not intended to be a compLete in the 1991 UBC. It is a quide to
AREA MTN.LTGHT MIN.VENT NO.EXTTS EGRESS
2 Family room 454 2 Bath room#l 44 2 Bedroom #3 I42 2 Bedroorn #2 140 2 Bath room#2 51 2 Master bath 1,26 2 Master bedroom 2IO 2 Ha1ls, closets, etc. 839
TOTAL FOR FLOOR 2006 1 Garage Ajs 1 Kitchen L91 1 Family room 334 1 Office !L2 1 T.i rri n/'Y r/'\/r'Yl ' +..Y r vv,,r 203 1 nininrv -^^*_ g+.r4.rY !vv', 175 1 Bath room 3g 1 Ha11s, closets, etc. 2I0
TOTAL FOR FLOOR t744 BUILDING TOTAL 3750
FOOTNOTES:
45.40
0.00
14.20
14.00
0.00
0.00
21.00
0.00
0.00 1q "n 33.40
11,.20
20.30
17 .50
0.00
0.00
22.70
2.20
7.10
7.00
2 .55
O. JU
10.50
0.00
0.00
v.65
IO. /U
5.60
10.15 n .7q
1.90
0.00
No
No
Yes
Yes
No
No
Yes
NO
No
No
No
No
No
No
No
No
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
z
1) EGRESS - An operable window or door that opens directly to the exterior is required from thj-s room. The minimum clla.-openab]e area must meet the following. -- Sec. 1204.1) The minimum clear height is 24 inches 2l The minimum cl_ear width is 20 j_nches 3) The minimum clear area is 5.? square feet 4) The maxirnum sil_1 height is 44 iriches The number of exits is based on Table 33-A (Dwellings)A mechanical ventil-ation systen may be used in in lleu of exterior openings for ventil_ation. l- Sec. 1ZOs. (c)
2)
3)
o o
ROOM DIMENSIONS:
Habitable space shall have a ceiling height of not less than 7 feet 6 j-nches. Kitchens, ha11s, bathrooms and toilet compartments may have a ceiling height of ? feet. measured to the lowest projection. Tf the ceiling is sloping, then the minimum height is required in onl-y I/2 of the area.
--Sec. 1207. (a)
Every dweJ-1ing unit shall have at least one room which has not l-ess than 120
c/.rr1a16 f6af ^f ffoor area. other habitable rooms except kitchens shal1 have v\iser
an a.ea of not l-ess than 70 square feet. -- Sec. 120?-. (b)
Habitable rooms other than a kitchen shall not be less than 7 feet in anv dimension. -- Sec. 1201 . (c)
GLAZTNG REQUIREMENTS:AII glazing in hazardous focations is required to be of safet.y
gJ-az j-ng material . -- Sec. 5406. (d)
L) GJ-azi-ng in ingress and egress doors except jalousies.
2) Glazlng in fixed and sl-iding panels of sliding door assemblies and panels in swinging doors other than wardrobe doors.3) Glazing in storm doors.
4') Glazing i-n af I unframed swinging doors.5) Glazing in doors and encl-osures for hot tubs, whirlpools, saunas, steam
rooms, bathtubs and showers. Gl-azing in any portion of a building wa1I enclosing these compartments where the bottom exposed edge of the qlazing is less than 60 inches above a standinq surface and drain inlet.6) Glazing in fixed or operable panels adjacent to a door where the nearest
exposed edge of the glazxing is within a 24-inch arc of ei-ther verticaf
edge of the door in a closed position and where the bottom exposed edge of the glazing is l-ess than 60 inches above the walking surface.1) Glazing in an indivi-dual fixed or operable paneI, other than those l-ocations described in iLems 5 and 6 above, than meets all of the following condj-tions :A. Exposed area of an individual pane greater t.han 9 square feet.B. Exposed bottom edge less than 18 inches above the ffoor.C. Exposed top edgte greater than 36 inches above the floor.D. One or more walking surfaces within 36 inches horizontally of the plane of the glazing.
8) GJ-azing in railings regardless of height above a walking surface.
Incl-uded are structural- bal-uster panels and nonstructural in-f i1l-panels.
See exceptions -
SMOKE DETECTOR REOUTREMENTS:
A smoke detector is required on the ceifing or wall at a point centrall-y located in the corridor or area qivinq access t.o each sleepinq area.
-- Sec. 1210. (a) 4.
A smoke detector is required on the ceiling or wall in each sleeping area. -- Sec. 1210. (a) 4.
A smoke detector is required on afl stories. -- Sec. 121-0. (a) 4.If the upper l-evel- contains sleeping room(s), a smoke detecLor is required in the ceiling of the upper l-evel close to the stairway.
-- Sec. 1210. (a) 4
Smoke deteclors are required to be wired to the building's power source and shall be equipped with a battery backup. -- Sec. 1210. (a) 3.
o o
Detectors shal-1 sound an alarm audible in all sleeping area of the dwelling in which they are located. -- Sec. 1210. (a) 4.
OCCUPANCY SEPARATION:
Between the garage and the residence, materials approved for thr fj-re construction are required on the garage side only and any doors between the garage and the residence are to be a self-closing 1 3/B inch solid core door or a 20 minute fire door. -- Table 5-B & Sec. 503.(d) exc. #3
STAIR REQUIREMENTS:
A stairway in a dwelling must be at least 35 inches wide. -- Sec. 3306. (b)
The maximum rise of a step is I inches and the minimum run i-s 9 inches.
-- Sec. 3306. (c) exc. #l-Provide a handrail- on one side a stairway 34 to 38 inches above the nosing if there is 4 or more risers. -- Sec. 3306. (i)
Provide a guard rail- where drop off is greater than 30 inches. Mi-nimum height = 36 inchesr maximum opening size = 4 inches. -- Sec.I'7 12.(a) exc. #1
The minimum headroom is 6 ft.- 8 inches. -- Sec. 3306. (o)
Enclosed usable space under the stairs j-s required to be protected as required for thr fi-re-resistive construction. -- Sec. 3306. (f)
SHAFT ENCLOSURES:1) Chutes and dumbwaiter shafts with a cros s-sect ional- area of not more than 9 square feet may lined on the inside with not less than 26 gage galvanized sheet metal with all joints tocklapped. The outside must be t hr construction. A11 openings into any such enclosure shafl be protected
by not fess than a sel-f-cl-osing solid wood door I3/8 inches thick or equivalent. -- Sec. 1706. (f)
2) Gas venta and noncombustible piping instal-led in wa11s passing through 3 floors or less do not need to be in t hour shafts.
-- Sec. 1706. (c)
3) Shafts for gas vents, factory-buil-t chimneys, piping, or ducts that do not extend through not more than 2 floors need not be in t hour shafts.
-- Sec. 1706. (c)
4) Al-J- other shafts are required to be enclosed in a t hour assembly.
-- Sec. 1706. (a)
ATT]C REQUIREMENTS:1) Provide an access to aLl attic areas wj-th a clear height of 30 j-nches
or more. The minimum size is 22 inches by 30 inches. There must be 30 inches or more cl-ear height above the access. -- Sec. 3205. (a)
2) Provide ventilation in all attic areas. The net free vent area i-s to be not less than l square foot for each l-50 square feet of attic area.
The vent area may be 1/300 if at Least 50% of the required ventil-ating
area is provided by ventilators located in the upper portion of the attic. The upper ventilators must be at feast 3 feet above the eve or cornice vents. -- Sec- 3205. (c)
o I
CRAWLSPACE REQUIREMENTS :1) Provide ventilation either by mechanical means or by openings in ext-erior walls. Opening sha11 provide a net area of not less than 1 square foot for
each 150 square feet of area in crawl space. Openings sha11 be distributed
on two opposite sides and be located as close to corners as practical .
-- Sec. 2516.(c) 6. Note: VenL openings may be reduced to 10% of the above if ground surface area is covered with an approved vapor barri-er and t.he building official approves.
2) Provide 18-inch by 24-inch access opening to the crawL space area. Note:
opening may be required to be larger if mechanical equipment is located in the crawl- space. -- Sec . 2516. (c) 2.3) Unl-ess the wood is listed as an approved wood of natural resj-stance to
decay or treated wood, the mini-mum clearance between exposed earth and floor joist is 18 inches. The minimum clearance to beams and girders is
Ls 12 inches. -- Sec. 2516. (c) 2.
ADDITIONAL REQUIREMENTS :
For R3 occupancy This project wiIl require a site improvement survey. Such survey
shal-l- be submitted and approved prior to resuest for frame
i n cnanJ- i an
Alf crawl spaces within the Town Of VaiI are limited to a earth to structural- floor ceiling height of 5', be earth floor only, be ventilated as per UBC 2516 (C) 6 with minimum access as per UBC
2516(C) 2 and maximum access of 9 sq. ft.
Any building site with a slope of 30 degrees or more shal-l- require an engineer design. Such design shall address drainage, soil- retaj-nage
and structural design.
Excavation below slabs on grade shalI not be permitted without prior
a r'rrt r rtrra I
Address numbers shall- be posted plainly visible and legible from the
streer..
For Ml occupancy
Slope garage floor to a1low for drainage to outside to provide a floor drain with sand and oil i-nterceptor to dry wel-I or to sewer.
Any garage floor drain connected to sewer must be approved by Upper
Eagle Valley Water & Sanitation District.
In garages with livinq area above, the walls of the garage wiich are bearing the area above shal1 be protected with one hour fire resistive construction. UBC 503(B) .
-t Nicholas Lampiris, Ph.D.
CONSULTING GEOLOGIST
P.O. BOX 2
stLT. coLoRADO 816s2
(303) 876-s400 (24 HOURS)
F\Lrqust 5, I9V:5
Fiandv .Johnson
It J Fr-ri I dersn Inc.
SLrite llt.:O;?7 l{. Frontaqe Rd.
Vai 1 |:Lr E1e,SZ
ltEr Roch FalI Evalutatir:n, Lot 4' ltlc]ck $, Lions Ridge Loop
Dear l'lr Johnson:
I have visitFd the proFerty referenced f,bove {or putrpeses of Roc[
Fall review for the -f own o{ Vail, The Eite is jurst east o+ the
VaiI Point pro.ject which used qroL(tinq to stabilise the Iedce
rock at the top o{ this hill. Directly above this lclt is a IeEs
f ormi dabl e 5i tt(ati on dute to l ess olttcrop wi th f ewer l osge bl ocks.
AIso. the runot-tt rone toward the hornesite is gentler trith more
brr-tsh cclver. -l"here ie. a Hiqh Fiocllf aI I Haaard in the arBa Bn thi{t
this is a qeologically sensitive area.
In mv opi ni on. the hcme shor-rl d be protected at the rear by a
trench and bet-m r^rith a net relie{ o{ at least 6 +eet butt I 'f eet
wourl d bre bebter . Irr addi h,i nn ' the rear stenr wal I shoutl d protrLtdF
at least 3 -f eet above {inished qr-.rde wi,th a strenqth o'f at leagt
3DC) peLrntls pFr sqL(are f otr't. rhere shoutl d be no wi ndorag nr Bthe'r
rone5 o{ treahness in this interval.
The congtt-t-tc'ti nrr c,.r lhi E hnmen wi th or wi thor-rt mi ti nati on t uri I I
not increase the trs:ard to other- propertv or gtructur-esr o ts
pLtbtitr ri ghts-nf-wayo butildinqer roadsn streets., easementsn
utilities or {acilities or clthflr properties o+ any kind' I+
the,re are quresti nns pl e'ase ccntact rne.
Sincqrely: .....44h .7i' j,':,,
Ni chol "u r-l,n6i rils , ' ,iJ rlonsurltinq Eeologist,i:,"ii
The ioned Yt=h as/h ave re ad th.e_S-g:Ly;r H azard Re po rt, date d
19$frepaled by
lAffe understand frorp the conclusions that fie proposed building is located in a ,r. A
\yt, 5 s--:.r\r hazard zone, and there is the potential hazard of \-( . K J-.,)iS
reaching the proposed house, causing damage. We are prepared to accept these facts aid
request the Town of Vail Building Department grant us a permit.
Geologlc Ha'ard Bevlew \\-rs-c\3 ' --.- ;l-,=-,ko-$l*\!=3 , L .^ -, ."*\.1" \.-r^.\
(Legal Descrlptlon) t
acktrowledge4before me this l5rLaay ot
*..,)1, (i'lr, (t, known to rne to Oe the person
unders
STATE OF COLORADO
COUNTY OF
COUNTY OF
person whose name is
he executed the same
going instrument and acknowledged to me that he
owl
J .-j ,/4
fore me this / I '=tay of
)
) ss.
)
.Executed the same for the purposes and consideration ttlerein expressed. 1 ,\ l, /' l.,", .i /,' f Lrtri-1 /*{'')l/''-\ dG."h---
'-/
My commission expires:
known to me to
d to the foregoing instrument and acknowledged
tor the purposes and rein express-ed.
be the
to me that
,/--=--
(Name, Orner)
Nicholas LamPiris, Ph'D'
CONSULTING GEOLOGIST
,,rr, Ja?ot"oo66 u''u"
(303) 876-5400 (24 HoURS)
August 5r LSSS
Randy Johnson
R J Buildersl Inc'
Suite tLzt 2077 N'
VaiI CO AIb37
Lot 4, Block 3t Liong Ridge uooP
RE: Rock Fal I Ev'eI uatl on I
39U pouttu:r p-' -'- i" thie tnterval .
zone6 o+ weakness
rh e c on at rutrt i on .r, !h ::. .1:i' q:t t
""?:rli'.' :?ffi .*""11X:ii: . ::The conatruction of tnl6 naruE V'^i"'puoiic rtgnt'-of-wayt .fiJ;;;pertv,or gtructuresl-Pl-"'i"i"liiiti iE" o'-'{aciIIties or
bui I d i nea r roaos, Ji.""t" r *."*-|]':? i t"llt"t :L;?""1.;-;;l t sat t on i
:i;;;-.piopertiesofanyklnd/l::-::i^'J..-----If there .t" qt"rsii";;'pleae,y' contact me'
y.rri^h t NIJL{ L'm".
Ni cnor as LarKP i r ! e
ilns"rttng Georoqist
, n\ "'t h:tn '
U
Frontage Rd'
Dear Mr. Johnsoru
r have vrsited ti,e FroPe'tY f,lI?'*.ffig 1??:"r:":"11'i::?l=il^
-
i*ii'.="iew for the Town of Vart'rtJ;; ;;-Jt"uili'ze the Iedse
i:il i?l?tr1""1":l t?'i:' .iii: -"''?l;;;: v ab:ve :l: :.'ilrii i'-'-f:
ir i:l ;tli;'""'; i:l i r* r: ?ll
-
;:h:"": i
=l
i !l'htk' : : : : g:; ;; "'
brugh cover' rn"il"iu-u figh 'Rockfall Hazard rn '
this i5 a geologically eensitive area'
In my oPinion' the home should 'be protected at 'the rear by a
rrench and berm';:.i-';-.;t. i:tt..i'o+-*l- i:1:t..1., I":1":l: i'iiih"
woul d be better .
"- i; addl ti on , the rear qtem *"' ',n?n-l?- Jt r ".=_t
:::ti#. : i ::';:*iiii{::i}:":i::' :rrl ;.':: "ff
"r"
;; ;; ;;h "'
I
I \ .|,4,r. ''t-- w" f
,f h ,-'
LJ
Andy Knudtsen
Town Pl anner
As you wi'l 1 recal I
vari ous occas i ons
bui lding plans of
Lions Ridge Loop.
16 November 1993
Pam Wh'ite and I met with you and DRB on
to express our concerns rel ated to the the Ken Whites, adjacent to our lot on
Pam and I agreed, after walking the site with you, to the
rought but what we consi dered to be permanent stakings.In the 'l ast week new stakes have been placed differently than the ones we approved, moving the house back on the lot. While this may be in accordance with the plot plan
'i t is not what we agreed to when Ben Aguilar put 'i n the
rough stak i ngs.
We are asking you to review this matter before a building permit is'i ssued and we would be happy to re-wal k the site with you.
S'i ncerel v.
B,:"Ss
x. c. Kristen Pritz
George Lamb
G*DM
Pam White
o
IL
RM
.l
TOWN OF VA
/\ /^ ,.\ fr ,.-\ /.\
PERMIT NO. !i ,: L, .; .,
PUBLIC WAY PE IT Contractor's copy to be kept on iobsite.
1.[,JT]ITE RESIDENCE LOT 4' BT- . 3' LIONSIiIDGE /,] Ig33 I-IO}{SRIDGE I,OOP
(Job Name or Location of Work)
BLADERIFNERS P.0. BOX 656 ED!A3DS, CO i)1632 524-7750 146-X
(Excavaling Contraclo. s Narn€, Addross, Phone, and Licenso No )
3. Work is for (circle one)
permitFee $75.00 EoND $1,660.00 ToTAL
Bill to:
Paid:JANEII, TURI{BLTLL Receipt #:2802
(Public Works)
INSPECTION REMAFKS:
(Public Wo*s)
SKETCH PLAN OF WORK ATTACHED
.l
eppltcnrton ron
TOWN OF VA|L f, , I
PUBLIC WAY PERMIT '19 7'T
1.
4. Work is for {circte one)
,,--- --f
( water) bewer )\>-l- -:-'\=-'-
t"no'91l1ln--,,
I:j
(lry-r Other
6,
8,
Trench-width
(min.4')
'BondAmount $ / | i.t,. ttu
i
permit Fee S 75. OO Total permit Fee $/ /Js c;o
tg
ALL MATERIAL, EQUIPMENT, AND TRAFFIC CONTROL DEVICES MUST BE ON THE JOBSITE BEFORE THE
JOB IS STARTED.
Rubber out-riggers are required on excavating equipment when working on asphalt.
Asphalt surfaces underneath the bucket shall be protected at all times.
A signature below indicates a review of the area and utility locations and approvals. Once all utility company
signatures are obtained, permitlee has option of routing application through the Public Works office to obtain the
necessary Town of Vail signatures. Please allow one week to.process.
Upper Eagle Valley Water and Sanitation (476-7480)(-
Public Service Company (1 -800-922-1 987)
PSCO-Natural Gas Group @68-2528\
Holy Cross Electric Company (949-5892)
U.S. West (1 -800-922-1 987)
TCI Cablevision of the Rockies (949-5530)
Town of Vail:
(1 Electricians (47 9-21 7 1 )I rri gation (47 9-21 6'l)
Public Works (47 9-21 58)1,._,,/ t:z- -"* ' ,-'(. - 'l
9. THERE WILL BE NO TOTAL STREET CLOSURES! A construction traffic control plan must be approved by the
Public Works Department prior to issuance of the permit.
1 0. All excavation must be done by hand within 1 8" of utilities - (Senate Btll '172).
11. PermitteemustcontactPublicWorksDepartmentat4T9-2lSE24hourspriortocommencingbacKill operations.
Failure to notify the Town will result in Jorfeiture of bond money. Scheduled inspections which are not ready may
result in the Town charging the contractor a reinspection fee.
12. I certify that I have read all chapters of Title 12 - Streets and Sidewalks, of the Vail Municipal Code and all utility
company agreements, signed by me, and will abide by the same, and that all utilities have been notified as required,
Contractor's Signature of Agreement
ATTACH PLAN OF WORK, INCLUDING CONTRUCTION TRAFFIC CONTROL PLAN
Show streets with names, buildings, and location of cuts. USE DASH LINES FOR CUT.
THIS IS NOT PUBLIC WAY PERMIT!
White - Public Works Yellow - Finance Pink - Community Development Gold - Contractor
r{
Gas Eleclri-c j*- $elephone
,d5frrpo6-site Acce*\i---.*__-
Date of Sigqature '!
,*s*cnoN REeuESr
,yR
/ <-r'...
'9'/
FRI
, '21 .'/ r7 I t i1.' 3,:r'q TOWN OF VAIL
/ 479-2138 ,/ /-:, /r ,f-i rrs.'.. .t '..t- / ., ,
PERMIT NUMBER F PROJECT
DATE JOB NAME
READY FOR
LOCATION:
INSPECTION:
CALLER
N TUES o"( PM ---<._.-
U DING:_-.r PLUMBING:€UILI --7;-
{-ro'
trFO
tr FRi
a'.' RO " PL)
tr tNs
tr SHI
o_
tr UNDERGROUND
O ROUGH / D.W.V.
tr ROUGH / WATER
FOOTINGS / STEEL
FOUNDATION / STEEL
FRAMING
ROOF & SHEER O GAS PIPING PLYWOOD NAILING
INSULATION tr POOL / H. TUB
SHEETROCK NAIL tr
FINAL
D
tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
O HEATING
tr
tr
tr
ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr
tr FINAL tr FINAL
tr APPROVED DISAPPROVED REINSPECTION REOUIRED
CORRECTIONS:
'.1 .<
DATE INSPECTOR
(,5;y )
PERMIT NUMBER OF PROJECT
o*, 2,/e /q q JoB NAME LOtl w F r s r ortttc r
CALLER
INSPECTION REQUEST
TOWN OF VAIL
READY FOR TNSpECION: MON Ga wED rHUR FRt Lt'15 eu @
LoCATIoN: 1frJ--1 Lrc-,^t= erOG tot'Q
BUILDING:
tr FOOTINGS
tr FOUNDATI
tr FRAMING
/ STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
O ROUGH / WATER
ON / STEEL
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
O INSULATION tr POOL / H. TUB
O SHEETROCK NAIL o
t(
tr FINAL
!
tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANIGAL:
O HEATING
o
tr
D
ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr FINAL
D
tr FINAL
"^',, 8/l / t/ rNSPEcroR
t t INSPECTION REQUEST
TOWN OF VAIL
PERMIT NUMBEB OF PROJECT
:,DATE i i JOBNAME
READY FOR
LOCATION:
INSPECTION:MON WED THUR FRI
479-2138
CALLER
TUES AM PM
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
D FOUNDATION / STEEL
D UNDERGROUND
O ROUGH / D.W.V.
tr ROUGH / WATER D FRAMING
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL tr
tr tr
tr FINAL O FINAL
ELECTRICAL:
O TEMP. POWER
MECHANICAL:
O HEATING
D
o
D
ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
o
tr FINAL D FINAL
Ef APPROVED
CORRECTIONS:
O DISAPPROVED N REINSPECTION REOUIRED
DATE INSPECTOR
L,'. -^4 rrustcnoN REeuESr
TOWN OF VAIL
479-2138
'-
-F
PERMIT NUMBER OF PROJECT
oor= i / ',r I-J JoB NAME
INSPECTION:
CALLER
.TUES-FRI READY FOR
LOCATION:
MON
i. [ - r i i ,r ,'
THUR
ii (
WED
BUILDING:
D FOOTINGS / STEEL
PLUMBING:
I FOUNDATION / STEEI-
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER tr FRAMING
tr
tr
ROOF & SHEER
PLYWOOD NAILING O GAS PIPING
INSULATION O POOL / H. TUB
tr SHEETROCK NAIt o
o
tr FINAL tr FINAL
ELECTR!CAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
n
D SUPPLY AIR
tr
tr ,r*o, ,' , ,/ tr F'NAL
opsffraowa-'1,6,rte [' l,'
D APPROVED
CORRFCTIONS:
SPECTION REQUIRED
1', rNsfrcnoN REeuEsr ' . \') TOWN OF VA|L
PERMIT 479-2138
DATE NAME
t\rarNl
CALLER :
READY FOR
LOCATION:
INSPECTION:TUES WED
'..'l
THUR FRI AM PM
NUMBER OF PROJECT
EUILDING:
D FOOTINGS
,tr FOUNDATI
O FRAMING
PLUMBING:
/ STEEL tr UNDERGROUND
tr ROUGH / D.W.V.
D ROUGH / WATER
ON / STEEL
tr
tr
D
o
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION O POOL / H. TUB
SHEETROCK NAIL tr
D
O FINAL tr FINAL
ELECTRICAL:MECHANICAL:
U TEMP. P OWER tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
D FINAL
tr APPROVED
CORRECTIONS:
O DISAPPROVED tr REINSPECTION REOUIRED
DATE INSPECTOR
,*rt"rroN REeuESr
TOWN OF VAIL t. -i
PERMIT NUMBER OF PBOJECT 479-2138
NAME
READY FOR
LOCATION:
INSPECTION:
CALLER
TUES WED THUR FRI AM PM
LJ VED
CORRECTIONS:
D DISAPPROVED tr REINSPECTION REOUIRED
BUILDING:PLUMBING:
O UNDERGROUND
tr ROUGH / D.W.V.
O ROUGH / WATER
tr FOOTINGS / STEEL -
I] FOUNDATION / STEEL
tr FRAMING
0
tr
ROOF & SHEER tr GAS PIPING PLYWOOD NAILING :
INSULATION D POOL / H, TUB
tr SHEETROCK NAIL tr
tr FINAL tr FINAL
ELECTRICAL:
O TEMP. POWER
MECHANICAL:
tr HEATING
U
u
tr
ROUGH O EXHAUST HOODS
CONDUIT D SUPPLY AIR
tr FINAL tr FINAL
OATE lNSPEcroR (:/,? -1, - ,' -
!/
PERMIT NUMBER OF PROJECT
I INSPECTION REQUEST
TOWN OF VAIL
479-2138
DATE , JOB NAME
CALLER
READY FOR INSPECTION: MON TUES WED THUR FRI AM PM
LOCATION:','.'*,
BUILDING:
E FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEE-
tr UNDERGROUND
D ROUGH / D.W.V.
tr ROUGH / WATER O FRAMING
- BOOF & SHEER
" PLYWooD NAtLtNG tr GAS PIPING
O INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL o
D D
tr FINAL O FINAL
ELECTRICAL:
tr-TEMP. POWER
MECHANICAL:
D HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT D SUPPLY AIR
tr tr
tr FINAL tr FINAL
tr APPROVED
CORRECTIONS:
tr DISAPPROVED O REINSPECTION REOUIRED
DATE INSPECTOR
t
INSPECTION REQUEST
TOWN OF VAIL
479-2138
AM PM
PERMI
DATE
T NUMBER OF PROJECT
JOB NAME
CALLER
READY FOR INSPECTION: MON TUES WED THUR FRI
LOCATION:
BUILDING:
O FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
O UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER tr FRAMING
- BOOF & SHEER
" PLvwooD NAtLtNG tr GAS PIPING
tr INSULATION O POOL / H, TUB
O SHEETROCK NAIL tr
tr D
tr FINAL tr FINAL
ELECTRlCAL:
tr TEMP, POWER
MECHANICAL:
tr HEATING
o
tr
tr
ROUGH O EXHAUST HOODS
CONDUIT tr SUPPLY AIR
o
O FINAL tr FINAL
tr APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REOUIRED
DATE INSPECTOR
t
INSPECTION REQUEST
TOWN OF VAIL
479-2138
AM PM
PERMIT NUMBER OF PROJECT
DATE JOB NAME
CALLER
READY FOR INSPECTION: MON TUES WED THUR FR
LOCATION:
BUILDING:
D FOOTINGS / STEEL
PLUMBING:
O UNDERGROUND
D ROUGH / D,W,V.
O ROUGH / WATER
O FOUNDATION / STEEL
N FRAMING
- ROOF & SHEER
" pLvwooD NA|L|NG D GAS PIPING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL D
D D
O FINAL D FINAL
ELE
OT
trF
oc
D-
CTRICAL:MECHANICAL:
TEMP. POWER D HEATING
ROUGH D EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr
O FINAL N FINAL
J{nppnoveo
CORRECTIONS:
O DISAPPROVED O REINSPECTION REQUIRED
DATE INSPECTOR
t(i/''|-
PERMIT NUMBER OF PROJECT
t INSPECTION REQUEST
TOWN OF VAIL I
oo*
ni' .' - i' ' ,' JoB NAME
479-2138
it
'-i
READY FOR
LOCATION:
INSPECTION:
CALLER
MON TUES ryED THUR
BUILDING:
D FOOTINGS / STEEL
PLUMBING:
E] UNDERGROUND
D FOUNDATION / STEEL q
q.
f.1
tr
tr
ROUGH / D.W,V.
tr FRAMING ROUGH / WATER
n ROOF & SHEER " PLYWOOD NAILING
tr INSULATION POOL / H, TUB
D SHEETROCK NAIL
o tr
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
D HEATING
D
o
D
ROUGH D EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr
D FINAL O FINAL
.d nppnoveo
CORRECTIONS:
O DISAPPROVED tr REINSPECTION REOUIRED
DATE INSPECTOR
I
INSPECTION REQUEST
TOWN OF VAIL
479-2138
I
READY FOR INSPECTION: MON TUES WED THUR FRI .,. AM PM
PERMIT NUMBER OF PROJECT
CALLER
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
D UNDERGROUND
tr ROUGH / D.W.V.
D ROUGH / WATER
D FOUNDATION / STEEL
tr FRAMING
.- ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
E] INSULATION O POOL / H. TUB
tr SHEETROCK NAIL tr
tr .
tr FINAL D FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
o
tr
o
ROUGH O EXHAUST HOODS
CONDUIT D SUPPLY AIR
o
tr FINAL O FINAL
tr APPROVED
CORRECTIONS:
tr DISAPPROVED D REINSPECTION REOUIRED
DATE INSPECTOR
PERMIT
t
INSPECTION REQUEST
TOWN OF VAIL
479-2138 NUMBER OF PROJECT
DATE JOB NAME
CALLER
READY FOR
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
O FOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER tr FRAMING '
n ROOF & SHEER " PLYWOOD NAILING D GAS PIPING
tr INSULATION D POOL / H, TUB
tr SHEETROCK NAIL o
o D
D FINAL tr FINAL
ELECTRICAL:
D TEMP, POWER
MECHANICAL:
O HEATING
O ROUGH tr EXHAUST HOODS
tr CONDUIT O SUPPLY AIR
tr o
D FINAL tr FINAL
cfRppnoveo
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REOUIRED
'1
DATE INSPECTOR
o
.-.
v Boyle Engineering, Inc.
143 E. Meadow Drive, Suite 390
Vail, Colorado 81657
Mr. Chuck Crowley
Alpine Service Corp.
2077 N. Frontage Road W. #103
Vail. Colorado 81657
Date:
Job Number:
Project:
Location:
Contractor:
Owner:
Weather:
Present at Site:
l -9-95
3t02
White Residence
Vail, Colorado
Alpine Service
Mr. White
Sunny, 40 degrecs
Chuck Crowley
Tim Boyle
The following items were observed:
The framing is essentially finished at this time. We discussed the concrete design for the entry porch and stairs.
The porch slab should be 6" fiber reinforced concrete with a #4 @ 12: olc. mat in the boftom. Drill & grout #4 x
18" dowels into the existing foundation walls around the perimeter, connect these to the reinforcing mat in the slab.
Provide a grade beam at the south side of this porch area. This should be 8" x 12" with 2 #4 in the bottom. This is
also to be doweled into the walls at each end with2 #4 dowels. The stairs should have the same #4 @ 12" olc. mat
in the bottom of the fiber reinforced concrete. Provide a minimum thickness of4" of concrete, and a #4 nosing bar
at each tread. These should also be doweled into the adjacent walls and grade beam with #4 x 18" @24" o/c.
The fiaming has basically been done according to the original plans with the changes that Chuck and I have
discussed. The only item which we had not discussed is the double | 3/4 x l4" micro:lam header at the northeast
comer of the roof fiaming. This is adequate to carry the design loads; add a vertical 2x4 on each side of the west
end up the face of the adjacent truss to stabilize the member against rotation.
Chuck has described the I I 7/8 'l'Jl and micro-lam framing that will be added in the garage to generate a storage
loft. This systern appears to meet all local Code requirements. I will make a final inspection next week to confirm
this.
Over the Living Room, the west valley beam should be connected to the king rafter with Iwo 3/4" diameter threaded
rods. The high end of both of these valleys should be supported off of the glu-lam beam below with three 2x6's.
The high end of both of the valleys over the Master Bedroom should be connected to thc dormer ridge beam with
two 3/4" diameter las bolts.
z
s
fi
E I
E
B
T t4
E
Ol
a
OJ O
UJ )
o.a
:)
F
T
h
c-)
t"gr
ro
0r
f
o
|n
I
I
tLO NO rrt o to o-- rr'l -ro - \io
ocD cl ouJ d(o -J .. (.)ofu cr <FO roro lo I oa z
ooul
mO CFOTL ulo o t!t'..-O
o no !o <(n cD oo tr)
!)ul
-l uH
o oo (I
tr do-c!
(I CTEC !1 AAU| Ul I t:f f o o t! trl L! l! O "t P"t't 'l)td i,r ?
2t | | | =
Frt o|l)tl) J <ro -@ro F ()- rudn !0
tL! trtt )t
rJ(I) rD ro.s |o.t
Ilx xxxnx ur f\J a' N avw t\]
o |I) ta)
f
z4
2..
c
d )
'rt (o
}'
ortm|o
f ! 0J -Cn'r i(J- (lo-r
FF iI):t:l
I J
I
c;
r.(ll
t\t i tlrour ol zao!Ho @ ou z)H<(n lrJ crt (II . I . c'L (Jct FI srJ
Irl ct H o. rr O<t! (9I Eu ryJ r z oo
ujqz r,(D u q
cHH ::i oi <t! o- E I .JO UTJ (,l ul ttJ lr, trr !L!<o zt! c:)Jf (,o- 6rrr Jt,d Fu' o)<lo- In It aJ >o(, t!o o\ oz r'-(,\!! H roi ztlH t/, ' E HZt! F :)
oHr o cc JOE Ul r< ('rO
O lt lhu) '<'rzr l< oo(J rr (l@ 6, rrt otrlz F D€f OIH oF (n uJ '|!c |Ir:)H Ha) :!,I orD IO E o.i
0a r/, o, F(J F.o t
I (J
F
z
o
CD
rJ
<z
ur(D l o-:J AI z-
zt OF
'I
*l
o
(rcvd t @5-? CJ Jrtfr) uJ Nnl (I
-. (/) HH t L
! r,orotD ! Ftlo (D >-
t2 LIIJI o tt trt t)HN I N :),{ . (/)
rrJ iH l,{rc!.cr x l-OO lr.,av (5 (Jlo rr) (D
z,< t nJ ts |Il lo uJ or(tE
AJ TTJ :z (5
} @H Z crF
' <iJ U s ujarm .(or(El(l JID
t.
to
z
oo t!d zw (9cr
(nI
zw
t! tu ocl
oo
rnt
(!F
F'
|,'uJ
-z
o
oo
rD
F
ro
.-\l aO -:t Hic!rro. F(J ;o t
%
!-,.
','r,F,
6S Hi4,-
fr*
2 I
*
6 u
t
B
]
14
ec .9 6o?w sb s o
€,-!.\, U
nr-
H-lt-.8i d u E 3rn
f
-',lP 16
s
E
=
o
ttt
I
T-l
)
cr<
I
z.A
r
.J
tLo NO tn() rO cl-i |-l
30 " \ior n )
rcf O I' (J o(D .)ouJ ro@ -J.- lJ)-r(\J o <6rll (o@ ao r o-i z sC!
oort
-ro lrlo o trj o..€r.]
@ rc,!o <(4@ !rc)
@)
nrr) J L>J UH CJ CJ
a ali a ll)r f E! o -.o_-Llt trj t! It o L (D uturu) t r,
t/t: nd: . .r zt I r I t rl,oL! l![l! (D Fc) C)()() O FO t0ulto ) c <d totorD F o (Ja! i-rn U!Hm !-I tr* ,l t
u(D ro@€tD{ to l!x tIX '(XXdX
(V
(/) (ll F NNN N
.clD{Ocn
tDq)d'O
(Di-
m
I
E|rlo1m
ttt
I
o. rL o- ct ) )J)
o, tlo.t|.
a,(llt E6rar rt uJLa, crJ(, I)iDou o!,roj ll E.c nl .Cdd l )(.Jd (J o, o-J(I o !.ct(D
FF d)f T J
o-trJ o ; F--1 t!trl(oN H (!r < lJt Or rd s)tt1'D)tzJ.rcriT (Dearr o o HFz aJ .tp ;Jo|cr) U' < (tlo rD C)u 'i (\JOJTIF':'AZJiCA F rlo-ts< O -lrl < zv,lh l! L o lrJ lI (.'G(lI I' oL lrl < 2 v,l/)t! lI (9c(r-
F.CC I Z arllr|(/, HH t H trt()o
rr
c
!,
lL
i--
u ogNJ I z oro . rr < < |tt H<) !(nt'|om (I zulrrlEz rr(D uc Furqt@ > (!l trruttlHH tl o-zE tD uirrl<u .l E LU tnn J @ct I oo ull I z <(, (,(/|trl l! trl a trJ t c! -J ooLrt<(J z l-r, c o rul o lr'rH <(of J:) ut cL ord HN I F< I(.JJ(9CI HU, n)lH rn <? ..<fq' l/|o(tJO>O(^|rJO rlJ tt E (,I O\ oz, Er-d . E u,c) lr-(,\cE F UJ :) (tHZrlH |/|:l t
O(tJO>O(^|rJO rlJ tt E (,I O\ oz, Er-E . E u,c) lr-(,\CE F rrt I (lHzu,tH l,|' t (9(J @ O- FtH:ztr- H tr zla I fN oHr (J cL H U, z- qtuJJdt (''!.. Ero c t F{ Hua uJ ur (, dc .
<tt Fc) rzr2- :t< '' u L.t uz |9 zI F< tt Edt [| all z oF ctourz F ttEi (! H (J ..C!O:EH . O <iJ (, ! ocjoF vr l!) argE
uJ dt (D <'9F (!ou)f H F{c) d!!I ctr, ro E oi 6 -I B<(t(rno- F(J F.E|t
@ -t H<ct(rc! Fu For
z I
6 (J
3
a {
a E
trl
o
o
l.-
0
fr)
c
O)
a
c)O
ln
o_
tt )
F
il B
o -
ot ct
to
r)1
c o
@
IL
F a to
I
FJ
n|Ow V)O rD ll.i lrl €o-t i.'li n I
cJ Z .- cf, o
rorD cl o trl ttt @ ftr J,. tn -r rv -r o <ed rororo L o I o4 Z so
CF )J (J oot biJOJ i- oF- cFoLr ruoN o Lr,t..io
| 'r-io 40 <rtc)oo AJ
O
d(r ltt J L>
(J cJ
FH
6 t-z q<
I
2.a
2..o>
F
lJl
(I--
)
rJ z.
ul-
;r
9T Ho-
o
@
|'r
o
@
I
to
I
lo Lo
]f]
dr(Dcb66
(D CO CO CO
:!J oo"o- ci ^s!:j -JJ !., o q rnur|,(!c]toarrlrt,fcn tltltrJ ! ttJ _ u') or .\\\ (tNN f I Z O ct t!l!L @.4.t O l) HFZ (jl 6,O-q,q- J(i|FI lrl < tI-O @ O(r lttna.',rqsF3g-=r-c
lr, <l zutt trJ t tt (!(tll UJ r (9qO,I .!.c'L
u,lt u, lt - N.. lrl (9 H Lrrl Fr Go EEE O -.- HCC I Z UtI|rirH r tJ O _.L urrrH ;t H UJUC'<LL (,E 9u lrl tu trt o L!, (, o(lNJ I z o.o ao(ntn f o.r , tr < < | t! HO r .J' (',er|n|r' c zurtrr(lz t@ uc |]|lidi . .., O FtrrtDl! > 6 ttJ(/|EHr{ :)a Oi Zl | | t odt Zr' lD UrU<rlO ottrJ.|! @ LrJ lDlo J . lDrr I oo uo HOOO ajt (. E z .ra |,'qru, |rJuJ |!Fo|rlrt ] ao trt f |rJ |'c|t!<(J z trl co <-(or.o F o llul cl ulH <(dl>J: tD ll aJi oN*d lJ|} o| HN. I F< I(JJtJ(l >1Ul O H (Ur =rH @ <z H<:lo, |', r,tt
lr- t tl t: i a Orrt J at >O('l L,Cl Fr lo tr, l, Ir t/ltr ct\ oz oa lrrnro-tro{r tox c. rt urtD =rF(9\c! H rli l! xav F tr, I EHztrJH l,:l c rxxxix n, (jl g, llt C,^ FIHZrr ts tl
t/| r! rv r\, (l o z< L fN oH t c) c L l,t' H tr, z- urutJo-I |'H cro EE|ttaro ttl Et (l t H H(Jo t! |,)|n n':Bb33H 3E 69 . 59 E=-E- e6 3"8 EEEdd t OH z cJF Oollz F t'Ef f (Jotlt!- .r lI H Lt .,a!oIH ' o J UE <(iJ IJ T OOOF IDUJ O'JE cr.rE dl s cr uj66 < -tF !o(Ju)=H Hcl at.'o o orl.rl ct a! xH ct{l I o a/l :E cJ E o x FOlt Je @ rt H<dr,|a! Fl, Fl|t
z
o
-1
PERMIT NUMBER OF PROJECT
DATE
t
INSPECTION REQUEST
TOWN OF VAIL
479-2138
i
JOB NAME
CALLER
TUES
ll. \r t .
WED THUR FRI AM PM READY FOR
LOCATION:
INSPECTION:l':l.
MON
BUILDING:
tr FOOTINGS
tr FOUNDATI
tr FRAMING
/ STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W,V.ON / STEEL
tr ROUGH / WATER
,_ ROOF & SHEEF
" PLYWoOD NAILING O GAS PIPING
tr INSULATION
tr SHEETROCK
tr POOL / H. TUB
NAIL rt
tr
tr FINAL
D
tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
X HEATING
tr
o
o
ROUGH tr EXHAUST HOODS
CONDUIT D
tg
SUPPLY AIR
1".
tr FINAL tr FINAL
d nBpnoveo tr DISAPPROVED O REINSPECTION REOUIRED
CORRECTIONS:
--.1 j
DATE INSPECTOR
IN
I
SPE CTION REQUEST
TOWN OF VAIL
479-2138 PERMIT NUMBER OF PROJECT
DATE
INSPECTION:
JOB NAME
MON
CALLER
TUES WED THUR READY FOR
LOCATION:
FRI PM AM
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
O UNDERGROUND
tr ROUGH / D.W.V.O FOUNDATION / STEEL
O FRAMING O ROUGH / WATER
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION D POOL / H. TUB
O SHEETROCK NAIL tr
o D
tr FINAL N FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
O ROUGH O EXHAUST HOODS
tr CONDUIT D SUPPLY AIR
o o
O FINAL tr FINAL
tr APPROVED
CORRECTIONS:
O DISAPPROVED tr REINSPECTION REQUIRED
DATE INSPECTOR
. .\
INSPECTION REQUEST
TOWN OF VAIL
479-2138 PERMIT NUMBER OF PROJECT
DATE JOB NAME
CALLER
READY FOR INSPECTION: MON TUES WED THUR FRI AM PM
LOCATION:
BUILDING:
O FOOTINGS / STEEL
PLUMEING:
tr UNDERGROUND
O ROUGH / D.W.V.tr FOUNDATION / STEE-
O FRAMING D ROUGH / WATER
- ROOF & SHEEB
" PLvwooD NAtLtNG D GAS PIPING
D INSULATION O POOL / H. TUB
tr SHEETROCK NAIL tr
tr tr
O FINAL D FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
D HEATING
tr ROUGH D EXHAUST HOODS
O CONDUIT O SUPPLY AIR
D tr
D FINAL tr FINAL
tr APPROVED
CORRECTIONS:
O DISAPPROVED D REINSPECTION REQUIRED
DATE ,INSPECTOR
.l
Boyle Engineering, Inc.
143 E. Meadow Drive, Suite 390
Vail. Colorado 81657
Mr. Chuck Crowley
Alpine Service Corp.
2077 N. Frontage Road W. #103
Vail. Colorado 81657
Date:
Job Number:
Project:
Location:
Contractor:
Weather:
Present at Site:
2-t0-95
3102
White Residence
1833 Lions Ridge Loop
Vail, Colorado
Alpine Service
Snowing, 30 degrees
Chuck Crowley
Tim Boyle
The following items were observed:
The framing is now finished. The items noted on the 1-9-95 Field Report have been addressed to my satisfaction.
The micro:lam beam at the northeast corner is now braced laterally, the valley beams have been connected to their
supporting members with threaded rods, and the loft framing over the garage meets local code requirements. Please
give me a call if you have any questions or comments on this matter.
BO ". :"11S
Si'- t 4e 6s i?;A -"..7
futt,W
tNs CTION REQUEST
TOWN OF VAIL
PERMIT NUMBER OF PROJECT 479-2138
DATE r- 8 -qs JOB NAME
CALLER k r'r'J
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
T] FOUNDATION / STEEL O ROUGH / D.W.V.
tr ROUGH / WATER tr FRAMING
,- ROOF & SHEER " PLYWooD NAILING tr GAS PIPING
tr INSULATION
tr SHEETROCK
tr POOL / H. TU8
o
d
tr FINAL
o
tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr o
tr FINAL tr FINAL
^)/
cl
READY FoR lNspEcr)of;,, @ ruES wED rHUR FRt / " '/a au (e!!-'
LocATfoN: lE5 \ L)rnt'- f?rt)otz L-riaF:
tr APPROVED
CORRECTIONS:
I orsneenoveo fr nerruseecrroN REQUIRED
tl:
*:ep{ P-ry' 'PFttvlttsto,\t t-4 S N€t(p t €F,'-t 6elr-turltJ tz) t:.*'t(
^., Ltc*1:PrAr^,tr r oaQ
Pfrt r14 u S-T LlFft -/
'1il tzt2
t - Q-q(DATE ]- O ')INSPECTOR
-rrf
t
INSPECTION REQUEST
TOWN OF VAIL
PERMIT NUMBER OF PROJECT
DATE
479-2138
'
JOB NAME
CALLER 1i
READY FOR INSPECTION: MON TUES WED THUR -FRI AM PM
LOCATION:
'l
BUILDING:
O FOOTINGS / STEEL
PLUMBING:
D FOUNDATION / STEEL
tr UNDERGROUND
O ROUGH / D.W.V.
D ROUGH / WATER tr FRAMING
n ROOF & SHEER " PLYWOOD NAILING D GAS PIPING
tr INSULATION tr POOL / H. TUB
O SHEETROCK NAIL D
tr D
tr FINAL O FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
D HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr D
T] FINAL tr FINAL
tr APPROVED
CORRECTIONS:
O DISAPPROVED tr REINSPECTION REOUIRED
DATE INSPECTOR
rhe r terns 0"r",#:,:"::':::1":"':::::'"
glving a perrnl.t a final C of O.
Please check off ia the box provided.
FINAL PLI'MBING
DATE:
FINAL I'IECHANICAL
DATE:
RESID. NAI'IE!IMPROVEMENT SURVEY lt.L ilL
n
n
w
u
tl
u
FINAI. BUILDING EAST SIDE:WEST SIDE:
DATE:
TEMPORARY C OF O
DATE:
CERTIFICATE OF OCCUPANCY
DATE:
LANDSCA?ING DUE
DATE:
lutriln
I
*INSPECTION REQUEST
TOWN OF VAIL
479-2138
DArE { ' l) - 7< JoB NAME -+}L:lr
PERMIT NUMBER OF PROJECT
READY FOR
LOCATION:
INSPECTION:
CALLER
MON TUES e AM Gt
Itr xl
wED fr;;;) '*'rili; L
BUILDING:
E FOOTINGS / STEEL
PLUMBING:
O UNDERGROUND
tr ROUGH / D.W.V.
D ROUGH / WATER
tr FOUNDATI
tr FRAMING
ON / STEEL
n ROOF & SHEER " PLYWOOD NAILING tr GAS PIPING
tr INSULATION O POOL / H. TUB
tr SHEETROCK NAIL tr
tr FINAL tr FINAL
ELEGTRICAL:
tr TEMP. POWER
MECHANICAL:
. tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr D
tr FINAL tr FINAL
APPROVED
CORRECTIONS:
i'*i,
tr DISAPPROVED
3 11 Pd stcr*,,
.. --*7-'tr REINSPECTION REQUIRED
C fc) /f (r
rrl
DATE .{-tr-t{INSPECTOR
o
PE INS . ') i;'t-t ;,-
CTION REQUEST
TOWN OF VAIL
479-2138 PERMIT NUMBER OF PROJECT
DATE JOB NAME
CALLER
^r-di$''
,'
AM PM READY FOR INSPECTION:MON
.7r LOCATION:
tr APPROVED
CORRECTIONS:
tr DISAPPROVED E REINSPECTION REOUIRED
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
D FOUNDATION / STEEL
D UNDERGROUND
tr ROUGH / D.W.V.
D ROUGH / WATER tr FRAMING
n ROOF & SHEER - PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL tr
D
O FINAL D FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH D EXHAUST HOODS
EI CONDUIT tr SUPPLY AIR
tr tr
tr FINAL tr FINAL
DATE INSPECTOR
o.
NSPE l CTION REQUES fowru oF vAlL
Fenrrttr NUMBER
//DATE
READY FOR INSPECTION:
LOCATTON:
JOB. NAME
. MON
CALLER
TUES
479-2138
BUTLDTNG:
O FOOTINGS / STEEL
B FOUNDATION / STEEL
PLUMBING:
tr UNDERGROUND
trl ROUGH / D.w.v-
tr ROUGH / WATER
O FRAMING
- ROOF & SHEER u ptYwooD NAILING
tr GAS PIPING
O ll.tsUgeftOt't
tr SHEETROCK
o Foou / H. TUB
NAII:E
trl
tr FINAL
MECHANICAL:
tr TEMP. POWER trt HEATING
O EXHAUST HOODS tr FIOUGH
E SUPPLY AIR B CONDUIT
o
B FINAL
E REINSPECTION REOU E DISAPPROVED AFPROVED
COFIREGTIONS;
'ATE lt-B-?5 rNsPEcroR
{,!&4
peR[rti r.tutr,,teER oF pnorecr
oor. ll- 8 - 7S JoB NAME LdthTE
or
INSPECTION REQUEST
TOWN OF VAIL
479-2138
CALLER
INSPECTION:MON ruES @ ,nr"FRI READY FOR
LOCATION:
BUILDING:PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
O ROUGH/WATER
O FOOTINGS / STEEL .
tr FOUNDATION / STEEL
tr FRAMING
r-r ROOF & SHEER " PLYWOOD NAILING - tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
B SHEETROCK NAIL
F1NAL Pc',Wic r*,satr tr F'NAL
MECHANICAL:
tr HEATING
tr EXHAUST HOODS
O @NDUIT O SUPPLY AIR
tr FTNAL
APPROVED REQUIRED
COFIFECTIONS:
r..t \ZLr-.,
INSPECTOR
I
IN
a
SPECTION REQUE1 TOWN OF VAIL
oere lt-1' 93 JoB NAME
READY FOR
LOCATION:
INSPECTION:WED
2t AM(
PERMIT NUMBER OF PROJECT 479-2138
BUILDING:
O FOOTINGS / STEEL
tr FOUNDATION / STEEL
PLUMBING:
tr UNOERGROUND
tr ROUGH / D.W-V.
B FOUGH / WATER B FRAMING
- FIOOF & SHEER
" PLvwooD NATLTNG tr GAS PIPING
E POOL/ H. TUB
tr_
tr_
tr FINAL
MECHANICAL:
T] HEATING
B EXHAUST HOODS
E INSULATION
EI SHEETROCK NAIL
o
ELEGTRICAL:
tr TEMP. POWER
Tf ROUGH
EI CONDUIT tr SUPPLY AIR
o
B FINAL
tr APPROVED
CORRECTIONS:
cl
tr FINAL
DISAPPBOVED
pe fi nerr.rseecrroru Reouri
rJ
-,
:t:
ttN SPDTJL
eoP. Lt N 'B+cr Peotr cr ru f fM 15< l,rle-
.7 'A-LFlr-I
S
-ffi PPoF L/r\
DATE ll_q^ B INSPECTOR
iJ itt '1 ) 1n'/ 1/, a:\
INSPECTION REQUES
TOWN OF VAIL
479-2138
/.s74
PERMIT NUMBER OF PROJECT
oerc lt-1' 95 JoB NAME t .-.1 lJr Tt DrS
CALLER
INSPECTION:MON TUES WED AM(
Ns et
READY FOR
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
tr FOUNDATION / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr FFAMING tr ROUGH/WATER
- ROOF & SHEER
" PLYwooD NATLTNG T] GAS PIPING
E INSULATION
g SHEETROCK
tr POOL/ H. TUB
NAIL u
tr
g
tr
tr APPROVED
CORRECTIONS:
DISAPPROVED
e
fi nerr.rseecroN REourR
PrtJ 9,D
7 nsPe* Mt tN Pcftc€ r/uErE$o 6t-SPDIJ4r.
ELECTRICAL:
EI TEMP. POWER
MECHANICAL:
C] HEATING
T] ROUGH tr EXHAUST HOODS
O CONDUIT
tr FINAL
EoP. LINZ
&r.t PpcF Lt xtZ O h
l^I -B+c_r Peotr cr ru f fyr lS5 tnlC" 7 OSFF I s
/l_q-- 75 INSPECTOR
Oo
6s 2,1
INSPECTION REQUEST
TOWN OF VAIL
479-2138 PERMI
DATE
T NUMBER OF PROJECT
lt- 0- ?S
INSPECTION:
JOB NAME
MON
CALLER
TUES UR FRI READY FOR
LOCATION:
WED TH
P
orl
A
t"J rhTe kes
BUILDING:
g FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER
tr FOUNDATION / STEEL
tr FRAMING
n ROOF & SHEER
- PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
'FfNAL SlrcDtNb o FTNAL
ELECTRICAL:
B TEMP. POWER
MECHANICAL:
tr HEATING
O EXHAUST HOODS
CONDUIT tr SUPPLY AIR
APPROVED
CORRECTIONS:
O DISAPPROVED tr REINSPECTION BEOUIRED
DATE //-g-7s INSPECTOR
Degn Review Action FoO
TOWN OF VAIL
Category Number
: t' i Project Name:
Building Name:
Project Description:
Owner. Address and Phone:
ArchitecVContact, Address and Phone:
Legal Description: Lot Zone District /
Project Street Address:
Comments:
Motion by:
Board / Staff Action
Vote:
Seconded by:
! Approval
! Disapproval
il Staff Approval
Conditions:
Town Planner
Date:DRB Fee Pre-Daid
t.vl..d, 7 | t4l9l
)r.€t- (PftfR<lJ o
BOARD
lfr
| ()v
JULts,9
"i]illtvt,DE
REVIEW
DESCRIPTION:
APPLICATION . TOWN OF
DATE RECEIVED:
DATE OF DRB MEETING:
****!t**!t*t
ONS I'T,A
!trt*it******
Ot < .,-t> T
R TYPE OF
'-J, O Q-1
|r1 or tcr c'{n.-L
ce,
Sr Dd
n
Er
I.
,t.
a meets and bounds
on a separate sheet,
1ega1
and aLLach
APPLICANT:
Address:^*,, uJLlr
G. NAME OF APPLICANT,S REPRESENTATfVE: jrra.. i_ A ( A.Ro vc-Mailing Address:
Phone
t.f NAME qr ourNER(S) :
OVINER(S) SIGNATURE:
is paid.
FEE SCHEDULE:
VALUATION
'rr n ?h "1 ^t\^rp v g 1v, tf Uv $ 10,001 - $ s0,000 $ s0, 001 - $ 1s0, 000
$1s0, 001 - $ s00, 000
$500,001 - $1,000,000 g Over $1,000,000
DESIGN REVIEW BOARD APPROVAL EXPIRES
APPROVAIJ UNIJESS A BUTIJDING PERMIT IS IS STARTED.
APPLICATIONS WILL NOT BE PROCESSED WITHOUT OIINER'S STGITA?UR.E
Condominium Approval if applicable.
DRB FEE: DRB fees, as shown above,\ are L.o be paid at the Lime of subrniLLat. of t.he DRB applilauion. l,atei, wnen applying for a buirding permic,-plbase identify tbe accurar,e varuation of Lhe proposal. The town of vail will adjust the fee according to fhe cable below, to ensure the correct. fee
c bx t)1.^t
@=/
FEE - ^^ ^^- iD zv.uu
$ s0.00
$100.00
$200.00
$400.00
$500.00
ONE YEAR AFTER FINAIJ
ISSUED AI{D CONSTRUCTION
New Const,rucLion (g200.00) X uinor A1 Leration ($20.00)Addir,ion ($50.00) concepLual neview (g0)
ADDRESS: 1857 L,o*:srz,n.-a (,,ot
LEGAL DESCRIPTION: , Lot Subdivision
If property is described bv description, plelase providl Lo Lhis application.
ZONTNG:
NAME OF Mailinq
Mailinq Address:
o
D
boye englneertng. Inc.
143 e. meodou/ dr. sulle 390
crorsroods shopplng center
voll, coloroclo E1657
3031476-2170
L'+ o&?-,, o 6rlrt ep
?*ttTtt+j
fbog-
H€FL F-4ev5>
O?(r+,lJQ
s
i{\
-.9
+*+ (pv*ek Fx;(,
.r'2Y*
-+ HAIH vbvtv
1o? ar
pelJrl PATto N
'-- Ex I 5Tt Nq qFt%{**x W4 Vrtf6Lt-.1 4Ttt+r4ngwt.gon eF(A q'tJI,
H6,j
ilauu
Att+oodJ
:-
c
_l fl
-o
=..9
-a $r
E€Woog f voo*?t&VFl totl
z€.4b oFE, Nl EVZVAT-ION
J,JH[re wetp^fi cE, zQ&g=s oPe$r N4
lOqA Ltops FIDqU looF
vhlL' coLoFFD,
-r-tJ-16
f,,$'l'lm
S-.r'ou' '$'e
;j . t4e6s :r'"
cit t'-to
fl):e#ls
F-i. 14e65 _:rn '.t4. ' ,/-\ ,E:
:6Fib@
4*4*/+ ), t tl rlfg L r er: tr'
OYlq-ttl14
feulpATltil
!-tFt u
boy'e englneerlng,lnc.
la3 a. meodo/ dr. suite 390
crossroocS sltopphg cenf er
voll,colorodo 61657 fi3t476-217o
I
Z
rLA N
)/2" = l'' o
E
{.
ur s
,J
=h'
c x
\\
t\t z L
0
7,
AT t-
i$
$(
-J
N
o d
F o
;
$\
' gte . 5qes1 |
( rn"*v tl /
Plrlll+<i
b(zovt' '. be?€po n t $vLotlT
b
^t ffi,(
7WY
trVlS?b'z
+d 1prtv l'f,,.orr'l
(.'t<r9lt{e 2rb@ lb
At4tIE
lbbn
Vf IL,
FE + | p€ilCE Eqgtra, cl7t4' q
LtoNS ?l4e L-ao?
CoW FhDo
1-tl -14
T
5 A-
$
_J IL
eJl "gil
lj o 4
M
\ry
o
I
tl
L
-]L
C
3
lL-
n
hJ o
LLJ C
tv t-
laj
o
o
l+?;-tl --
,ll 7s
\
i-:
T-IJ
,)
trl _I
I l-l
ll
o
.1
-,t
.N
N
ir
I ,' ._
TOWN OF VAIL *",.*,*"._{/r87',
ADDRI,l|S
PROJF,(]T
DATE /Tfl
CHECKS MADE PAYABLE TO TOWN OI'VAIL
rcclunTlro.ITE}t NO. TIX C(rrE^{. ?OrAl
0 0000 4 540 ZONING AND ADDRESS MAPS $5.00
0 0000 42415 UNIFORM BUILDING CODH $54.00
0 0000 42415 UNIFORM PLUMBING CODE $39.00
0 0000 424 l5 UNIT'ORM MI]CHANICAL CODE $ 3 7.00
0 0000 42415 UNIFORM FIRI; CODE $36.00
0 0000 4 415 NATIONAL ELECTRICAL CODI 5l7.U0
0 0000 4241 5 OTIIER CODE BOOKS
0 0000 4 548 tsLUL PzuNTS (MYLARS)s7.00
0 0000 42412 XEROX COPIIIS $0.25
0 oo(\t 424t2 STUDIES
0 0000 424t2 TOVFIIES COMPUTIR PROCRAM s5.00
0 oo00 42311 PENALTY FEES / RE-INSPECTIONS
0 0000 4 332 PLAN REVII]W RE-CHECK FEE I$40 PER I{R,
J 0 ooo0 42332 OFF I{OURS INSPECTION FIIES
liil (.)0000 414t2 CONTRACI'ORS LICIJNSLS TEES
0 0000 4 4t3 SIGN APPLICATION FII:s20.00
0 0000 4 4tJ ADDI I'IONNL SI(iNA(;I: FLL tSI.OO PLR SO.FT,
0 0000 42440 VTC ART PROJI:CT DONATION
0 QQOO 4lJ3 r)}RE PAID DISIGN REVII]W BOARD FEE 4)--4
=l
0 000s.4+i7t INVESTIGATION F'EIr (BUILDINc)
3 0000 451l0 TOV PARKING FUND
0 0000 22027 TOV NI-;WSPAPER DISPENSER FUND * 0l 0000 2lll2 't' Ax ABLE @ 4o1o (STATE)* 0l 0000 4t010 TAXABLE (4 4% (TOw\)
0l 0000 42171 BUILDING INVESTICATION
OTIIER
it PEC APPLICATION FEES
0l 0000 4 JJI'ADDITIONAL cRFA "25u Ii200.00
0 0000 4 330 CONDITIONAL USE PERMIT $200.00
0 0000 4 330 EXTERIOR ALT]]RATION ILIISS T}IAN IOO SO.FT.$200.00
0 0000 4 130 EXTERIOR ALTERATION IMORI, TIIAN IOOSO.FT'$500.00
0 0000 4 330 SPECIAL DEVELOPMENT DISTRICT tNEW $ 1.500.00
0 0000 4 330 SPECIAL DEVELOPMENTD1STRICT iMAJOR AMEND s I ,000.00
0 0000 4 330 SPECIAL DEVELOPMI]NT DISTRICT IMINOR NMENI)s200.00
0 0000 4 330 SUBDIVISION
0 0000 4 ll0 VARIANCE !;250.00
0 0000 4 310 ZONING CODE AMI]NDMENTS $250.00
$
I
*,
0 0000 4 330 RH. ZONING $200.00
OTIIER
OT}IER
(.oMME\TS
-
,/^v /
cAsEr
-r
cK,]t 4-bg i1,r.oLr w_
RECEIPT - The To*r ofVd I I
I
I ,.g<,1,Tr 16899 DATE
RECEIVED FROM
ADDRESS
f:o
-|-{tlr-lf{ r_rF rJ}f I L
I'l i:cei I.inel ug l=Eh
i - .'ar -r'.:
;i,,,,: i".rt,' + :.';;;,,-',
--,: r', ,r-ir-. i. ,i+ t.':l:
i:i:,i.; ,.:-,; r. r:,F,t;;,ilii:
:11,'.,r.;;, i ii:::.a.,:.ir-t i,.1
i teri; p; i,j
r:i rJ :-.j!:iiiiii. l :1 il i r-iiiii: i
r-lii:iIiL!,a : ,,, ii r,-t-i*r.i
-ic. I.iii
Frri+,-rn t p.:id
l;,, {r:1
i" L'lt:.i
i. 'r ri i' _:.i::
-FHF|f-lfr .irfrt-l
': r,i-ii ,-:.a-;ljL+i tli_lil