Loading...
HomeMy WebLinkAboutHotel "Permit Responses 07-10-2007 � • %��.5��Z�f� �o�/ ��� Marc E.Espinosa David B.Robinson,P.E. __ F Richard D.Matthies,P.E. ENGINEERING,iNC. Stephen C.Rondinelli,AIA �:,.:��,.,,;,.,.�,.,���r�e�:���>,r��,�, Robert M."Mike"Cordero,P.E. MEETING AGENDA/Minutes Project: Ritz Carlton—Vail Project#: 45006003 Location: Town of Vail Building Department Conference Room Meeting Date: July 10, 2007 1:30- 3:30pm Subject: Permit Responses Date Issued: Attendees: 1. Status of approval of the administrative modifications already submitted. (Common Path of Travel and Seismic Requirements) 2. Exiting from the pool deck. 3. Egress from occupancies adjacent to the S-2 Parking areas to Exit Stairs. 4. Garage CO Exhaust System discharge location. 5. Expanded Smoke Management System including additional stair enclosures, elevator hoist- ways, corridor exhaust and assembly area pressurization. 6. Exterior unprotected openings on south and east sides of the building with respect to the easements for the fire lane on the east side and the access easement on the south side of the -� property. The easements prevent future construction in these areas and the building should be able to have unprotected openings as allowed by the overall widths. 7. Drinking fountains to be provided along with bottled water display/dispensing stations. C:�DOCUMENTS AND SETTINGS\SCR\LOCAL SETTINGS\TEMPORARY INTERNET FILES\CONTENT.OUTLOOK\KR740YCA\RITZ VAIL BID-FIRE MEETING AGENDA 7 10 2007.DOC 5420 WARD ROAD,SUITE 200,ARVADA,Co�oRADO 80002-1838•TE�EPHONE: 303-422-7400•FAx: 303-422-7900 � __ 8. Additional Administrative Modifications or Memorandum of Understanding? • AMR-Water curtain on the exterior windows on the tower(retail area)and in the garden level corridor at the fitness area. • MOU— Smoke Management System 9. Additional VRDC questions? • Fire line relocate and emergency access between Marriott and Ritz __ �( Structural Engineer of record to provide approval of any structural changes before �J framing? � "": Soils report update to be provided by VRCD �• Clarification of Access and Drainage Inspections prior to footing inspection? • Clarification on comment related to TOV providing a framing inspection and requirement for a Location Certificate(ILC) submitted to TOV 48 hours prior to requested inspection. 10. Update on re-submittal of CD's for Permit. 11. Additional Questions and Comments. C:�DOCUMENTS AND SETTINGS\SCR�I.00AL SETTINGS\TEMPORARY INTERNET FILES\CONTENT.OUTLOOK\KR740YCA\RITZ VAIL BID-FIRE MEETING AGENDA 7 10 2007.DOC 5420 WARD ROAD,SUITE 200,ARVADA,COLORADO 80002-1838�TELEPHONE: 303-422-7400�FAx: 303-422-7900