Loading...
HomeMy WebLinkAboutB12-0299 comment letter Date: 7/23/2012 Re: B12-0299 927 Sandstone Road Dear Mr. Cabin RESPONSE INSTRUCTIONS ● Submit two complete sets of revised construction documents containing the requested information with all plan revision items clouded or otherwise identified. ● Please respond in writing to each comment with a response letter addressing each comment. BUILDING COMMENTS Architectural Comments: 1. Plans to reflect scope of work indicated on application. 2. Is the ceiling a fire rated assembly? If so, what assembly is being proposed. How are penetrations being protected? 3. All plan sheets to be on the same size paper per Town of Vail submittal requirements. Structural Comments: 1. What is the proposed beam connection for the new LVL? 2. Plans reference the IRC. The building, per the application, is a building regulated by the IBC. Please revise Plumbing Comments: 1. What is the proposed gas piping material? 2. If black iron is being used the minimum pipe size to the boiler is ¾”. Mechanical Comments: 1. What is being proposed for the fireplace? Gas log appliance? What are the materials for the chimney? Provide information showing it is approved for gas. 2. What is the cfm requirement for the new range? Outside air may be required. Please annotate on plans. Electrical Comments: Reviewed and accepted PLANNING COMMENTS NA FIRE COMMENTS Reviewed and accepted PUBLIC WORKS COMMENTS NA Sincerely, Martin A. Haeberle Chief Building Official