Project Name: EVER VAIL PRELIM PLAN PEC Number: PEC070020
Project Description:
EVER VAIL DEVELOPMENT-FINAL APPROVAL FOR A PRELIMINARY PLAN PRIOR TO A MAJOR
SUBDIVISION TO FACILITATE THE REDEVELOPMENT OF THE EVER VAIL AREA (WEST
LIONSHEAD)
�
�
Participants:
OWNER VAIL CORPORATION 03/27/2007
PO BOX 959
AVON
CO 81620-0959
APPLICANT VAIL RESORTS DEVELOPMENT INC03/27/2007
P.O. BOX 959
AVON
CO 81620
License: C000001633
Phone: 970-845-2547
Project Address: 934 S FRONTAGE RD VAIL Location: 934 S. FORNTAGE RD
Legal Description: Lot: Block: Subdivision: Unplatted
Parcel Number: 2103-121-0000-5
Comments: See Conditions
Motion By: Pierce
Second By: Viele
Vote: 6-0-0
Conditions:
BOARD/STAFF ACTION
Adion: APPROVED
Date of Approval: 09/24/2007
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond:300
PEC approval shall not be not become valid for 20 days following the date of
approval.
Cond:113
All development applications submitted to the Town after the effective date of
Ordinance 26, Series 2006 shall be subject to the pending employee housing
regulations in whatever form they are finally adopted; provided, however, that if
the Town fails to adopt the pending employee housing regulations by April 15, 2007,
this Ordinance shall not apply to such development applications.
Cond: CON0009658
That the applicant cannot praeed forward with the review and approval of a final
plat for Ever Vail until such time as the Federal Highway Administration, the
Colorado Department of Transportation, and the Town of Vail has approved the
� relocation and design of the South Frontage Road, West Forest Road, and the location
of the proposed roundabout.
Cond. CON0009659
That the applicant shall provide adequate Right of Way for the construction of a two
lane roundabout if the single lane roundabout does not provide sufficient excess
capacity for the long term future. The current preliminary analysis indicates the
need for a single lane roundabout, however it would not be prudent to eliminate the
ability to increase the size of the roundabout in the future by confining it by
private property/buildings. Based on current trends and similar designs the needed
excess capacity may be between 30%-50%, this shall be further analyzed and reviewed
within the final Traffic Report. Any necessary changes to the roundabout design
based on the final approved Traffic Impact Report shall be shown on the plans
submitted for review and approval in conjunction with the Ever Vail Final Plat.
Cond: CON0009660
That the applicant establishes a stream tract for the Red Sandstone Creek and
provides this tract to the Town of Vail for inclusion into the stream tract system.
The stream tract shall be depicted upon the plans submitted for review and approval
of the Ever Vail Final Plat.
Planner: Warren Campbell PEC Fee Paid: $1,500.00
u
�
� -J
�
of Lot 1, Block 2, Vail Lionshead Filing 3, and setting forth details in regard thereto. (PEC07-
0027, PEC07-0028)
ACTION: Table to October 8, 2007
MOTION: Kurz SECOND: Viele VOTE: 6-0-0
Ca2,�{'. a�, aoo� PE c�I:�u�C.S 30 minutes
5. A request for a final approval of a preliminary plan for a major subdivision, pursuant to Chapter
13-3, Major Subdivision, Vail Town Code, to allow for the creation of two new lots necessary for
the redevelopment of the properties known as "Ever Vail" (West Lionshead), located at 862, 923,
934, 953, 1031 South Frontage Road West, and the South Frontage Road West right of
way/Unplatted (a complete legal description is available for inspection at the Town of Vail
Community Development Department), and setting forth details in regard thereto. (PEC07-0020)
Applicant: Vail Resorts Development Company, represented by Thomas Miller
Planner: Warren Campbell
ACTION: Approval, with Condition(s)
MOTION: Pierce SECOND: Viele VOTE: 6-0-0
Condition(s):
1) That the applicant cannot proceed forward with the review and approval of a final plat
for Ever Vail until such time as the Federal Highway Administration, the Colorado
Department of Transportation, and the Town of Vail has approved the relocation and
design of the South Frontage Road, West Forest Road, and the location of the
proposed roundabout.
2) That the applicant shall provide adequate Right of Way for the construction of a two
lane roundabout if the single lane roundabout does not provide sufficient excess
capacity for the long term future. The current preliminary analysis indicates the need
for a single lane roundabout, however it would not be prudent to eliminate the ability
to increase the size of the roundabout in the future by confining it by private
property/buildings. Based on current trends and similar designs the needed excess
capacity may be between 30%-50%, this shall be further analyzed and reviewed within
the final Traffic Report. Any necessary changes to the roundabout design based on
the final approved Traffic Impact Report shall be shown on the plans submitted for
review and approval in conjunction with the Ever Vail FinaF Plat.
3) That the applicant establishes a stream tract for the Red Sandstone Creek and
provides this tract to the Town of Vail for inclusion into the stream tract system. The
stream tract shall be depicted upon the plans submitted for review and approval of the
Ever Vail Final Plat.
Warren Campbell gave a presentation per the staff memorandum.
Dominic Mauriello, Mauriello Planning Group LLC, representing the applicant, gave a
presentation in which he stated that he understands the issue regarding the Red Sandstone
Creek stream track and dedications that may be required; request that the staff recommended
condition be revised to specifically request the creation of an easement. Furthermore he agreed
with the staff memorandum that the proposed plan does meet the goals and objectives of master
plan.
Commissioner Kurz asked what the impact to the existing wetands there would be.
Dominic Mauriello and Tom Miller responded that the wetlands had been delineated and there
may be some impacts, but it will be mitigated. It was further described that a bridge spanning
the creek would be put in place in conjunction with the Frontage Road realignment.
Page 4
Commissioner Pierce requested that future applications show adjacent parcels and building
outlines in context with the proposed Ever Vail.
� Commissioner Kurz inquired as to the future of the water treatment plant.
Warren Campbell explained that Eagle River Water and Sanitation District would like to move
certain functions from their current location; however, has indicated that there will always be a
need for some type of water treatment facility in that location.
Commissioner Scott inquired as to the precedence regarding stream setbacks and stream tract
dedications with private development.
Warren Campbell stated that Red Sandstone Creek has a 30-foot minimum setback for
structures from the centerline of Red Sandstone Creek and that the Town has required
dedications of stream tracks previously.
Dominic Mauriello stated that Vail Resorts Development Company (VRDC) has planned to
protect and enhance the creek, but suggested that the rezoning of the creek to Natural Area
Preservation District would unduly restrict VRI from constructing certain improvements to
"amenitize" the natural stream track area (bridges/paths, etc.).
Commissioner Viele asked if the Town (PEC) would review a preliminary plan without some
assurance that the road re-alignment is going to be approved by CDOT.
Tom Miller explained that VRDC is working on memorandum of understanding with CDOT.
� Warren Campbell added that staff would not have allowed this application to have proceeded
forward at this point if it were not likely that CDOT was going to approve the relocation. He
added that there have been multiple conversations between CDOT and the Public Works
Department regarding the Frontage Road realignment.
Jim Lamont, representing the Vail Village Homeowners Association asked Tom Kassmel if the
proposed right-of-way shown on the preliminary plan was wide enough for construction of all
elements of the "Grand Boulevard" proposed/envisioned by the Town.
Tom Kassmel, Town Engineer, responded that the proposed right-of-way contained enough
width to accommodate the "Grand Boulevard".
Jim Lamont then asked if the single lane round about sufficient.
Tom Kassmel stated that based on current projections, a single lane will work to handle future
capacity. He added that the Town also wants right of way dedicated to accommodate any future
expansion of the roundabout.
30 minutes
6. A request for a final recommendation to the Vail Town Council for a zone district boundary
amendment, pursuant to 12-3-7, Amendments, Vail Town Code, to allow for a rezoning from
Arterial Business District to Lionshead Mixed Use 2, located at 953 and 1031 South Frontage
Road (a complete legal description is available for inspection at the Town of Vail Community
Development Department), and setting forth Details in regard thereto. (PEC07-0021)
Applicant: Vail Resorts Development Company, represented by Thomas Miller
� Planner: Warren Campbell
ACTION: Table, to October 8, 2007
Page 5
� ,
�
�OWNOFVA� '
❑
Conditional Use Permit
Application for Review by the
Planning and Environmental Commission
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2128 fax: 970.479.2452
web: www.vailgov.com
Gene�al Information:
All projects requiring Planning and Environmental Commission review must receive approval prior to submitting a
building permit application. Please refer to the submittal requirements for the particular approval that is requested.
An application for Planning and Environmental Commission review cannot be accepted until all required information
is received by the Community Development Department. The project may also need to be reviewed by the Town
Council and/or the Design Review Board.
Type of Application and Fee:
■
�..
■
■
■
■!
■
■
Rezoning
Major Subdivision
Minor Subdivision
Exemption Plat
Minor Amendment to an SDD
New Special Development District
Major Amendment to an SDD
Major Amendment to an SDD
(no exterior modifications)
$1300
$1500
$650
$650
$1000
$6000
$6000
$1250
�
❑
❑
❑
❑
❑
�
❑
❑
Conditional Use Permit
Floodplain Modification
Minor Exterior Alteration
Major Exterior Alteration
Development Plan
Amendment to a Development Plan
Zoning Code Amendment
Variance
Sign Variance
$650
$400
$650
$800
$1500
$250
$1300
$500
$200
Description of the Request' Major Subdivision to facilitate the redevelopment
of the Ever Vail (West Lionshead) area
Location of the Proposal: Lot: Block: Subdivision: metes and bounds
Physical Address: N/A
Parcel No.: 21oaizi0000a (various) (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.)
Zoning: N/A
Name(s) of Owner(s): Vail Corporation and SOHO Development, LLC
Mailing Address:
950 17th Street, Suite 1600, Denver, CO 80202/PO Box 959, Avon, CO
Phone: 970-248-7230
Owner(s) Signature(s):
Name of Applicant' Vail Resorts Development Comp�any c/o Thomas Miller
Mailing Address• Po soX 9s9, Avon, co si6zo
. Phone: �54-2544
----_._
� � �
;,' � j f --�__�
i� 3 J'�-'
t .� n F.
� � ��
! Q �j
� �,
� o
D o
�
�" — F� �
;� �r
,- -_—=-----�!
Address' tmillerl@vailresorts.com
. Check No�� �` l� By. ' v�J-l'
'`� Z-.i,��cS ,,� PEC No.: �'
. ir' Project No.: _
lanni ng\PEC\conditional_use10-18-2006.doc
754-2555
, � �s��
�
Page 1 of 5 1/4/O6
1
O
�
G
�
�
********************************************************************************************
� TOWN OF VAIL, COLORADO Statement
********************************************************************************************
Statement Number: R070000366 Amount: $1,500.00 03/27/200708•25 AM
Payment Method: Check Init: JS
Notation: 366914/VAIL
RESORTS
-----------------------------------------------------------------------------
Permit No: PEC070020 Type: PEC - Major Subdivision
Parcel No: 2103-121-0000-5
Site Address: 934 S FRONTAGE RD VAIL
Location: 934 S. FORNTAGE RD
Total Fees: $1,500.00
This Payment: $1,500.00 Total ALL Pmts: $1,500.00
Balance: $0.00
************************+t**********t**********t******t**************************************
ACCOUNT ITEM LIST:
Account Code
--------------------
PV 00100003112500
Description Current Pmts
------------------------------ ------------
PEC APPLICATION FEES 1,500.00
-----------------------------------------------------------------------------
�
C
LEGAL DESCRIPTION
PARCEL 1:
Our Order No: VB50018110
A PARCEL OF LAND SITUATED IN A PART OF THE NEl/4 OF THE NEl/4 OF SECTION 12,
TOWNSHIP 5 SOUTH, RANGE 81 WEST OF THE SIXTH PRINCIPAL MERIDIAN, TOW1V OF VAIL,
COUNTY OF EAGLE, STATE OF COLORADO, SAID PARCEL BEIIVG MORE PARTICULARLY
DESCRIBED AS FOLLOWS;
BEGIIVNING AT THE SOUTHWESTERLY CORNER OF TRACT A, SOUTH FROIVTAGE ROAD
SUBDIVISION, PER THE PLAT THEREOF RECORDED NOVEMBER 6, 2000, UNDER RECEPTION
NO. 743424 IN THE OFFICE OF THE EAGLE COUNTY CLERK AND RECORDED, SAID CORNER
ALSO BEING ON THE NORTHERLY RIGHT OF WAY OF THE SOUTH FRONTAGE ROAD OF
INTERSTATE HIGHWAY 1VUMBER 70; THEIVCE ALONG SAID NORTHERLY RIGHT OF WAY SOUTH 73
DEGREES 37 MINUTES 52 SECONDS WEST 200.00 FEET TO THE TRUE POINT OF BEGIIVNING;
THENCE CONTINUING ALONG SAID NORTHERLY RIGHT OF WAY SOUTH 73 DEGREES 37 MINUTES
52 SECONDS WEST 519.60 FEET TO THE POINT OF INTERSECTION OF SAID NORTHERLY
RIGHT OF WAY AND THE SOUTHERLY RIGHT OF WAY OF INTERSTATE HIGHWAY IVUMBER 70;
THENCE DEPARTING SAID NORTHERLY RIGHT OF WAY 1VORTH 53 DEGREES 51 MINUTES 29
SECOIVDS EAST 246.03 FEET ALONG THE SOUTHERLY RIGHT OF WAY OF INTERSTATE HIGHWAY
NUMBER 70; THENCE CONTINUING ALONG SAID SOUTHERLY RIGHT OF WAY NORTH 58 DEGREES
53 MINUTES 10 SECONDS EAST 247.30 FEET; THENCE NORTH 59 DEGREES 28 MINUTES 16
SECONDS EAST 49.07 FEET; THEIVCE DEPARTING SAID SOUTHERLY RIGHT OF WAY SOUTH 16
DEGREES 51 MINUTES 09 SECONDS EAST 158.18 FEET TO THE TRUE POINT OF BEGINNING.
PARCEL 2:
EASEMENT FOR INGRESS AND EGRESS AS CREATED BY COMBINATION RELEASE OF EXISTING
EASEMENTS AND CREATION OF 1VEW CROSS EASEMEIVT AGREEMEIVT RECORDED DECEMBER 13,
1989 IN BOOK 519 AT PAGE 619, COUNTY OF EAGLE, STATE OF COLORADO.
ALTA COMMITMENT
Schedule B - Section 1
(Requirements) Our Order No. VB50018110
The following are the requirements to be complied with:
Item (a) Payment to or for the account of the grantors or mortgagors of the full consideration for the estate or
interestto be insured.
Item (b) Proper instrument(s) creating the estate or interest to be insured must be executed and duly filed for record,
to-wit:
Item (c) Payment of all taxes, charges or assessments levied and assessed against the subject premises which are due
and payable.
Item (d) Additional requirements, if any disclosed below:
This product is for informational purposes only and does not constitute any form of tide guarantee nor insurance. The
liability of the company shall not exceed the charge paid by the applicant for this product, nor shall the company be
held liable to any party other than the applicant for this product.
THIS COMMITMENT IS FOR INFORMATIOIV ONLY, AND IVO POLICY WILL BE ISSUED
PURSUANT HERETO.
ALTA COMMITMENT
Schedule B - Section 2
(Exceptions) Our Order No. VB50018110
The policy or policies to be issued will contain exceptions to the fot(owing unless the same are disposed
of to the satisfaction of the Company:
1. Rights or claims of parties in possession not shown by the public records.
2. Easements, or claims of easements, not shown by the public records.
3. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, and any facts which a correct survey and
inspection of the premises would disclose and which are not shown by the public records.
4. Any lien, or right to a lien, for services, labor or material theretofore or hereafter furnished, imposed by law and
not shown by the public records.
5. Defects, liens, encumbrances, adverse claims or other matters, if any, created, first appearing in the public records or
attaching subsequent to the effective date hereof but prior to the date the proposed insured acquires of record for
value the estate or interest or mortgage thereon covered by this Commitment.
6. Taxes or special assessments which are not shown as existing liens by the public records.o the Treasurer's office.
7. Liens for unpaid water and sewer chuges, if any..
8. In addition, the owner's policy will be subject to the mortgage, if any, noted in Section 1 of Schedule B hereof.
9. RIGHT OF PROPRIETOR OF A VEIN OR LODE TO EXTRACT AND REMOVE HIS ORE
THEREFROM SHOULD THE SAME BE FOUND TO PENETRATE OR INTERSECT THE PREMISES
AS RESERVED IN UNITED STATES PATENT RECORDED DECEMBER 29, 1920, IN BOOK 93
AT PAGE 42.
10. RIGHT OF WAY FOR DITCHES OR CANALS CONSTRUCTED BY THE AUTHORITY OF THE
UNITED STATES AS RESERVED IN UNITED STATES PATEIVT RECORDED DECEMBER 29,
1920, IN BOOK 93 AT PAGE 42.
11. TERMS, CONDITIONS AND PROVISIONS OF COMBINATION RELEASE OF EXISTING
EASEMENTS AND CREATION OF NEW CROSS EASEMENT AGREEMENT RECORDED DECEMBER
13, 1989 IN BOOK 519 AT PAGE 619.
12. EASEMENT AS GRANTED TO PUBLIC SERVICE COMPANY OF COLORADO IIV INSTRUMENT
RECORDED AUGUST 31, 1993 IN BOOK 618 AT PAGE 291.
13. EXISTING LEASES AND TENANCIES.
14. THE EFFECT OF LANDSCAPING AND CURB AND GUT"TER LYING WITHIN THE FRONTAGE
ALTA COMMITMENT
Schedule B - Section 2
(Exceptions) Our Order No. VB50018110
The policy or policies to be issued will contain exceptions to the following unless the same are disposed
of to the satisfaction of the Company:
ROAD RIGHT OF WAY AS SHOWN OIV IMPROVEMENT LOCATION CERTIFICATE PREPARED BY
GORE RANGE SURVEYING, LLC DATED JUNE 9, 2005 JOB 1V0. 02-008.
NOTE: THE POLICY OF TITLE INSURANCE WILL INCLUDE AN ARBITRATION PROVISIOIV.
THE COMPANY OR THE INSURED MAY DEMAIVD ARBITRATIOIV. ARBITRABLE MATTERS MAY
INCLUDE, BUT ARE 1VOT LIMITED TO, ANY CONTROVERSY OR CLAIM BETWEEN THE
COMPANY A1VD THE INSURED ARISING OUT OF OR RELATING TO THIS POLICY, ANY
SERVICE OF THE COMPANY IN CONNECTION WITH ITS ISSUANCE OR THE BREACH OF A
POLICY PROVISION OR OTHER OBLIGATIOIV. PLEASE ASK YOUR ESCROW OR TITLE
OFFICER FOR A SAMPLE COPY OF THE POLICY TO BE ISSUED IF YOU WISH TO
REVIEW THE ARBITRATION PROVISIONS AND ANY OTHER PROVISIONS PERTAINING TO
YOUR TITLE INSURANCE COVERAGE.
Our Order No: VB50018109
LEGAL DESCRIPTION
PARCEL:1
A PARCEL OF LAND SITUATED IN A PART OF THE NE1/4 OF THE NEl/4 OF SECTION 12,
TOWNSHIP 5 SOUTH, RANGE 81 WEST OF THE SIXTH PRIIVCIPAL MERIDIAN, TOW1V OF VAIL,
COUNTY OF EAGLE, STATE OF COLORADO, SAID PARCEL BEING MORE PARTICULARLY
DESCRIBED AS FOLLOWS:
BEGINNING AT THE SOUTHWESTERLY CORNER OF TRACT A, SOUTH FRONTAGE ROAD
SUBDMSION, PER THE PLAT THEREOF RECORDED NOVEMBER 6, 2000, UNDER RECEPTION
N0. 743424 IN THE OFFICE OF THE EAGLE COUIVTY CLERK AND RECORDER, SAID CORIVER
ALSO BEING THE NORTHERLY RIGHT OF WAY OF THE SOUTH FRONTAGE ROAD OF INTERSTATE
HIGHWAY NUMBER 70; THENCE ALONG SAID NORTHERLY RIGHT OF WAY S. 73 DEGREES 37
MINUTES 52 SECONDS W. 200.00 FEET; THENCE DEPARTING SAID 1VORTHERLY RIGHT OF WAY
N. 16 DEGREES 51 MINUTES 09 SECONDS W. 158.18 FEET TO A POINT ON THE SOUTHERLY
RIGHT OF WAY OF INTERSTATE HIGHWAY NUMBER 70; THENCE ALONG SAID SOUTHERLY RIGHT
OF WAY N. 59 DEGREES 28 MIIVUTES 16 SECONDS E. 274.19 FEET TO THE NORTHWESTERLY
CORNER OF INTERSTATE HIGHWAY NUMBER 70 PARCEL 26B; THENCE DEPARTING SAID
SOUTHERLY RIGHT OF WAY AND ALONG THE WESTERLY BOUNDARY OF SAID PARCEL 26B S. 10
DEGREES 36 MINUTES 52 SECONDS W. 31.26 FEET TO THE SOUTHWESTERLY CORNER OF SAID
PARCEL 26B, SAID POINT ALSO BEING THE 1VORTHWESTERLY CORNER OF SAID TRACT A;
THENCE ALONG THE WESTERLY BOUNDARY OF SAID TRACT A S. 10 DEGREES 45 MINUTES 05
SECONDS W. 34.40 FEET; THENCE CONTINUING ALONG SAID BOUNDARY S. 04 DEGREES 37
MINUTES 43 SECONDS E. 170.34 FEET TO THE POINT OF BEGIIVNING, COUNTY OF EAGLE,
STATE OF COLORADO.
PARCEL 2:
EASEMENT FOR INGRESS AND EGRESS AS CREATED BY COMBINATION RELEASE OF EXISTING
EASEMENTS AND CREATION OF NEW CROSS EASEMEIVT AGREEMENT RECORDED DECEMBER 13,
1989 IN BOOK 519 AT PAGE 619, COUIVTY OF EAGLE, STATE OF COLORADO.
ALTA COMMITMENT
Schedule B - Section 1
(Requirements) Our Order No. VB50018109
The following are the requirements to be complied with:
Item (a) Payment to or for the account of the grantors or mortgagors of the full consideration for the estate or
interestto be insured.
Item (b) Proper instrument(s) creating the estate or interest to be insured must be executed and duly filed for record,
to-wit:
Item (c) Payment of all taxes, charges or assessments levied and assessed against the subject premises which are due
and payable.
Item (d) Additional requirements, if any disclosed below:
This product is for informational purposes only and does not constitute any form of title guarantee nor insurance. The
liability of the company shall not exceed the charge paid by the applicant for this product, nor shall the company be
held liable to any party other than the applicant for this product.
THIS COMMITMEIVT IS FOR INFORMATION ONLY, AND NO POLICY WILL BE ISSUED
PURSUANT HERETO.
ALTA COMMITMENT
Schedule B - Section 2
(Exceptions) Our Order No. VB50018109
The policy or policies to be issued will contain exceptions to the following unless the same are disposed
of to the satisfaction of the Company:
1. Rights or claims of parties in possession not shown by the public records.
2. Easements, or claims of easements, not shown by the public records.
3. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, and any facts which a correct survey and
inspection of the premises would disclose and which are not shown by the public records.
4. Any lien, or right to a lien, for services, labor or material theretofore or hereafter furnished, imposed by law and
not shown by the public records.
5. Defects, liens, encumbrances, adverse claims or other matters, if any, created, first appearing in the public records or
attaching subsequent to the ei%ctive date hereof but prior to the date the proposed insured acquires of record for
value the estate or interest or mortgage thereon covered by this Commitment.
6. Taxes or special assessments which are not shown as existing liens by the public records.o the Treasurer's office.
7. Liens for unpaid water and sewer charges, if any..
8. In addition, the owner's policy will be subject to the mortgage, if any, noted in Section 1 of Schedule B hereof.
9. RIGHT OF PROPRIETOR OF A VEIN OR LODE TO EXTRACT AND REMOVE HIS ORE
THEREFROM SHOULD THE SAME BE FOUND TO PEIVETRATE OR INTERSECT THE PREMISES
AS RESERVED IN UNITED STATES PATENT RECORDED DECEMBER 29, 1920, IN BOOK 93
AT PAGE 42.
10. RIGHT OF WAY FOR DITCHES OR CANALS CONSTRUCTED BY THE AUTHORITY OF THE
UNITED STATES AS RESERVED IN UNITED STATES PATENT RECORDED DECEMBER 29,
1920, IN BOOK 93 AT PAGE 42.
11. ANY RIGHTS, INTERESTS OR EASEMENTS IN FAVOR OF THE STATE OF COLORADO, THE
UNITED STATES OF AMERICA, OR THE GENERAL PUBLIC, WHICH EXIST OR ARE
CLAIMED TO EXIST IN, OVER, UNDER AND/OR ACROSS THE WATERS AND PRESENT AND
PAST BED AND BANKS OF THE RED SANDSTONE CREEK.
12. TERMS, CONDTTIONS AND PROVISIONS OF RIGHT OF WAY EASEMENT RECORDED JULY 09,
1984 IN BOOK 388 AT PAGE 756.
13. TERMS, CONDITIONS AND PROVISIONS OF COMBINATION RELEASE OF EXISTING
EASEMENTS AND CREATION OF NEW CROSS EASEMENT AGREEMENT RECORDED DECEMBER
13, 1989 IN BOOK 519 AT PAGE 619.
ALTA COMMITMENT
Schedule B - Section 2
(Exceptions) Our Order No. VB50018109
The policy or policies to be issued will contain exceptions to the following unless the same are disposed
of to the satisfaction of the Company:
14. TERMS, CONDITIONS AND PROVISIONS OF CONVEYANCE OF EASEMENT RECORDED JUNE
25, 1991 IN BOOK 556 AT PAGE 702 AND RERECORDED AUGUST 29, 1991 IN BOOK
561 AT PAGE 191.
15. LACK OF A DIRECT ACCESS ON AND TO INTERSTATE HIGHWAY 70, WHICH ABUTS
SUBJECT PROPERTY.
16. EXISTING LEASES AND TENANCIES.
17. THE EFFECT OF LANDSCAPING AND CURB AND GUTTER LYING WITHIN THE FROIVTAGE
ROAD RIGHT OF WAY AS SHOWN ON IMPROVEMENT LOCATIOIV CERTIFICATE PREPARED BY
GORE RANGE SURVEYING, LLC DATED JUNE 9, 2005 JOB N0. 02-008.
NOTE: THE POLICY OF TITLE INSURANCE WILL INCLUDE AN ARBITRATION PROVISION.
THE COMPANY OR THE INSURED MAY DEMAND ARBITRATION. ARBITRABLE MAT"TERS MAY
INCLUDE, BUT ARE NOT LIMTTED TO, ANY CONTROVERSY OR CLAIM BETWEEN THE
COMPANY AND THE INSURED ARISING OUT OF OR RELATING TO THIS POLICY, ANY
SERVICE OF THE COMPANY IN CONNECTION WITH ITS ISSUANCE OR THE BREACH OF A
POLICY PROVISIOIV OR OTHER OBLIGATION. PLEASE ASK YOUR ESCROW OR TITLE
OFFICER FOR A SAMPLE COPY OF THE POLICY TO BE ISSUED IF YOU WISH TO
REVIEW THE ARBITRATION PROVISIONS AND ANY OTHER PROVISIONS PERTAINING TO
YOUR TITLE IIVSURANCE COVERAGE.
Our Order No: VB50018107
LEGAL DESCRIPTION
A PART OF THE NORTHEAST 1/4 NORTHEAST 1/4 OF SECTION 12, TOWIVSHIP 5 SOUTH, RANGE
81 WEST OF THE 6TH P.M., DESCRIBED AS FOLLOWS:
BEGINNING AT THE POINT OF INTERSECTION OF THE EAST LINE OF SAID SECTION 12
WITH THE SOUTHERLY RIGHT OF WAY LINE OF U.S. HIGHWAY NO. 6, SAID POINT BEING
634.15 FEET SOUTHERLY FROM THE 1VORTHEAST CORNER OF SAID SECTION 12; THENCE
WESTERLY, ALONG THE SOUTHERLY RIGHT OF WAY LINE OF SAID HIGHWAY, A DISTANCE OF
240 FEET, MORE OR LESS, TO A POINT O1V THE EAST HIGH WATER BANK OF RED SANDSTONE
CREEK; THEIVCE SOUTHERLY, ALONG THE SINUOUSITIES OF SAID EAST HIGH WATER BANK,
200 FEET, MORE OR LESS, TO ITS INTERSECTION WITH THE NORTH HIGH WATER BANK OF
GORE CREEK; THENCE EASTERLY, ALOIVG THE SIIVUOUSITIES OF THE NORTH HIGH WATER
BANK OF GORE CREEK, 245 FEET, MORE OR LESS, TO ITS INTERSECTION WITH THE EAST
LINE OF SAID SECTION 12; THENCE NORTHERLY, ALONG SAID EAST LIIVE, 160 FEET,
MORE OR LESS, TO THE POINT OF BEGINNING, COUNTY OF EAGLE, STATE OF COLORADO.
ALTA COMMITMENT
Schedule B - Section 1
(Requirements) Our Order No. VB50018107
The following are the requirements to be complied with:
Item (a) Payment to or for the account of the grantors or mortgagors of the full consideration for the estate or
interestto be insured.
Item @) Proper instrument(s) creating the estate or interest to be insured must be executed and duly filed for record,
to-wit:
Item (c) Payment of all taxes, charges or assessments levied and assessed against the subject premises which are due
and payable.
Item (d) Additional requirements, if any disclosed below:
This product is for informational purposes only and does not constitute any form of title guarantee nor insurance. The
liability of the company shall not exceed the charge paid by the applicant for this product, nor shall the company be
held liable to any party other than the applicant for this product.
THIS COMMITMENT IS FOR INFORMATION ONLY, AND NO POLICY WILL BE ISSUED
PURSUANT HERETO.
ALTA COMMITMENT
Schedule B - Section 2
(Exceptions) Our Order No. VB50018107
The policy or policies to be issued will contain exceptions to the following unless the same are disposed
of to the satisfaction of the Company:
1. Rights or claims of parties in possession not shown by the public records.
2. Easements, or claims of easements, not shown by the public records.
3. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, and any facts which a correct survey and
inspection of the premises would disclose and which are not shown by the public records.
4. Any lien, or right to a lien, for services, labor or material theretofore or hereafter furnished, imposed by law and
not shown by the public records.
5. Defects, liens, encumbrances, adverse claims or other matters, if any, created, first appearing in the public records or
attaching subsequent to the effective date hereof but prior to the date the proposed insured acquires of record for
value the estate or interest or mortgage thereon covered by this Commitment.
6. Taxes or special assessments which are not shown as exisflng liens by the public records.o the Treasurer's office.
7. Liens for unpaid water and sewer charges, if any..
8. In addition, the owner's policy will be subject to the mortgage, if any, noted in Section 1 of Schedule B hereof.
9. RIGHT OF WAY FOR DITCHES OR CANALS CONSTRUCTED BY THE AUTHORITY OF THE
UNITED STATES AS RESERVED IN UNITED STATES PATENT RECORDED DECEMBER 29,
1920, IN BOOK 93 AT PAGE 42.
10. RIGHTS OF TENANTS UNDER UNRECORDED LEASES.
11. ANY RIGHTS, INTERESTS OR EASEMEIVTS IN FAVOR OF THE STATE OF COLORADO, THE
UNTTED STATES OF AMERICA, OR THE GENERAL PUBLIC, WHICH EXIST OR ARE
CLAIMED TO EXIST IN, OVER, UNDER AND/OR ACROSS THE WATERS AND PRESEIVT AND
PAST BED AND BANKS OF THE RED SANDSTONE CREEK.
12. ANY RIGHTS, INTERESTS OR EASEMENTS IN FAVOR OF THE STATE OF COLORADO, THE
UNITED STATES OF AMERICA, OR THE GENERAL PUBLIC, WHICH EXIST OR ARE
CLAIMED TO EXIST IN, OVER, UNDER AND/OR ACROSS THE WATERS AND PRESEIVT AND
PAST BED AND BANKS OF THE GORE CREEK.
13. TERMS, CONDTTIONS AND PROVISIOIVS OF RELEASE AND RIGHT-OF-ENTRY RECORDED
AUGUST 07, 2002 AT RECEPTION NO. 803774.
ALTA COMMITMENT
Schedule B - Section 2
(Exceptions) Our Order No. VB50018107
The policy or policies to be issued will contain exceptions to the following unless the same are disposed
of to the satisfaction of the Company:
14. TERMS, CONDITIONS AND PROVISIOIVS OF RIGHT OF REFUSAL AS COIVTAINED IN
UNRECORDED DEALER SUPPLY AGREEMENT.
15. TERMS, CONDITIONS, PROVISIONS AND RESTRICTIONS AS CONTAIIVED IN SPECIAL
WARRANTY DEED RECORDED AUGUST 07, 2002 AT RECEPTION 1V0. 803775.
NOTE: THE POLICY OF TITLE INSURANCE WILL INCLUDE AN ARBITRATIOIV PROVISION.
THE COMPANY OR THE INSURED MAY DEMAND ARBITRATION. ARBITRABLE MATTERS MAY
INCLUDE, BUT ARE NOT LIMITED TO, ANY CONTROVERSY OR CLAIM BETWEEN THE
COMPANY AND THE INSURED ARISING OUT OF OR RELATING TO THIS POLICY, ANY
SERVICE OF THE COMPANY IN CONIVECTION WITH ITS ISSUANCE OR THE BREACH OF A
POLICY PROVISIOIV OR OTHER OBLIGATION. PLEASE ASK YOUR ESCROW OR TITLE
OFFICER FOR A SAMPLE COPY OF THE POLICY TO BE ISSUED IF YOU WISH TO
REVIEW THE ARBTTRATION PROVISIOIVS A1VD ANY OTHER PROVISIONS PERTAIIVING TO
YOUR TITLE INSURANCE COVERAGE.
Chicago Tide Insurance Company
ALTA COMMITMENT
Our Order No. VB50018105
Schedule A Cust. Ref.:
Property Address:
923 FRONTAGE RD W. / TRACT A SOUTH FRONTAGE ROAD SUB VAIL, CO 81657
1. Effective Date: February 02, 2007 at 5:00 P.M.
2. Policy to be Issued, and Proposed Insured:
Information Binder
Praposed Insured:
THE VAIL CORPORATION, A COLORADO CORPORATION
3. The estate or interest in the land described or referred to in this Commitment and covered herein is:
A Fee Simple
4. Tide to the estate or interest covered herein is at the ef%ctive date hereof vested in:
THE VAIL CORPORATION, A COLORADO CORPORATION
5. The land referred to in this Commitment is described as follows:
TRACT A, SOUTH FRONTAGE ROAD SUBDIVISION, ACCORDING TO THE FIIVAL PLAT RECORDED
NOVEMBER 6, 2000 AT RECEPTION NO. 734424, COUNTY OF EAGLE, STATE OF COLORADO.
ALTA COMMITMENT
Schedule B - Section 1
(Requirements) Our Order No. VB50018105
The following are the requirements to be complied with:
Item (a) Payment to or for the account of the grantors or mortgagors of the full consideration for the estate or
interestto be insured.
Item (b) Proper instrument(s) creating the estate or interest to be insured must be executed and duly filed for record,
to-wit:
Item (c) Payment of all taxes, charges or assessments levied and assessed against the subject premises which are due
and payable.
Item (d) Additional requirements, if any disclosed below:
This product is for informational purposes only and does not constitute any form of title guarantee nor insurance. The
liability of the company shall not exceed the charge paid by the applicant for this product, nor shall the company be
held liable to any party other than the applicant for this product.
THIS COMMTTMEIVT IS FOR INFORMATION ONLY, AND 1V0 POLICY WILL BE ISSUED
PURSUANT HERETO.
ALTA COMMITMENT
Schedule B - Section 2
(Exceptions) Our Order No. VB50018105
The policy or policies to be issued will contain exceptions to the following unless the same are disposed
of to the satisfaction of the Company:
1. Rights or claims of parties in possession not shown by the public records.
2. Easements, or claims of easements, not shown by the public records.
3. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, and any facts which a correct survey and
inspection of the premises would disclose and which are not shown by the public records.
4. Any lien, or right to a lien, for services, labor or material theretofore or hereafter furnished, imposed by law and
not shown by the public records.
5. Defects, liens, encumbrances, adverse claims or other matters, if any, created, first appearing in the public records or
attaching subsequent to the effective date hereof but prior to the date the proposed insured acquires of record for
value the estate or interest or mortgage thereon covered by this Commitment.
6. Taxes or special assessments which are not shown as existing liens by the public records.o the Treasurer's office.
7. Liens for unpaid water and sewer charges, if any..
8. In addiflon, the owner's policy will be subject to the mortgage, if any, noted in Section 1 of Schedule B hereof.
9. LIENS FOR UNPAID WATER AND SEWER CHARGES, IF A1VY.
10. RIGHT OF PROPRIETOR OF A VEIN OR LODE TO EXTRACT A1VD REMOVE HIS ORE
THEREFROM SHOULD THE SAME BE FOUND TO PENETRATE OR INTERSECT THE PREMISES
AS RESERVED IN UIVITED STATES PATENT RECORDED DECEMBER 29, 1920, IN BOOK 93
AT PAGE 42.
11. RIGHT OF WAY FOR DITCHES OR CANALS COIVSTRUCTED BY THE AUTHORITY OF THE
UNITED STATES AS RESERVED IN UNITED STATES PATENT RECORDED DECEMBER 29,
1920, IN BOOK 93 AT PAGE 42.
12. WATER A1VD WATER RIGHTS, DITCH AND DITCH RIGHTS, WHETHER OR NOT OF PUBLIC
RECORD.
13. EASEMENT AND RIGHT OF WAY FOR RED SANDSTONE CREEK.
14. EASEMENT AS RESERVED BY HOLY CROSS ELECTRIC ASSOCIATION, INC. IN DEED
RECORDED FEBRUARY 21, 1995 IN BOOK 661 AT PAGE 743.
ALTA COMMITMENT
Schedule B - Section 2
(Exceptions) Our Order No. VB50018105
The policy or policies to be issued will contain exceptions to the following unless the same are disposed
of to the satisfaction of the Company:
15. TERMS, CONDITIONS AND PROVISIONS OF GORE CREEK PLACE DEVELOPMENT AGREEMENT
RECORDED MARCH 10, 2005 AT RECEPTION NO. 908751.
16. TERMS, CONDITIOIVS AND PROVISIONS OF ORDINANCE N0. 32 SERIES OF 2004
RECORDED MARCH 10, 2005 AT RECEPTION N0. 908755.
NOTE: THE POLICY OF TITLE IIVSURANCE WILL INCLUDE AN ARBITRATION PROVISION.
THE COMPANY OR THE INSURED MAY DEMAND ARBITRATION. ARBITRABLE MATTERS MAY
INCLUDE, BUT ARE NOT LIMITED T0, ANY CONTROVERSY OR CLAIM BETWEEIV THE
COMPANY AND THE INSURED ARISIIVG OUT OF OR RELATING TO THIS POLICY, ANY
SERVICE OF THE COMPANY IN COIVNECTION WTTH ITS ISSUANCE OR THE BREACH OF A
POLICY PROVISION OR OTHER OBLIGATION. PLEASE ASK YOUR ESCROW OR TITLE
OFFICER FOR A SAMPLE COPY OF THE POLICY TO BE ISSUED IF YOU WISH TO
REVIEW THE ARBTTRATION PROVISIONS AND ANY OTHER PROVISIONS PERTAINING TO
YOUR TTTLE INSURANCE COVERAGE.
Chicago Title Insurance Company
ALTA COMMITMENT
Our Order No. VB50018103
Schedule A Cust. Ref.:
Property Address:
862 FRONTAGE RD W. / SOUTH FRONTAGE ROAD, TRACT B VAIL, CO 81657
1. Effective Date: February 02, 2007 at 5:00 P.M.
2. Policy to be Issued, and Proposed Insured:
Information Binder
Proposed Insured:
THE VAIL CORPORATION, A COLORADO CORPORATION
3. The estate or interest in the land described or referred to in this Commitment and covered herein is:
A Fee Simple
4. Tide to the estate or interest covered herein is at the effective date hereof vested in:
THE VAIL CORPORATION, A COLORADO CORPORATION
5. The land referred to in this Commitment is described as follows:
TRACT B, SOUTH FRONTAGE ROAD SUBDIVISION, ACCORDING TO THE FINAL PLAT RECORDED
NOVEMBER 6, 2000 AT RECEPTION NO. 734424, COUNTY OF EAGLE, STATE OF COLORADO.
ALTA COMMITMENT
Schedule B - Section 1
(Requirements) Our Order No. VB50018103
The following are the requirements to be complied with:
Item (a) Payment to or for the account of the grantors or mortgagors of the full consideration for the estate or
interestto be insured.
Item (b) Proper inshument(s) creating the estate or interest to be insured must be executed and duly filed for record,
to-wit:
Item (c) Payment of all taxes, charges or assessments levied and assessed against the subject premises which are due
and payable.
Item (d) Additional requirements, if any disclosed below:
This product is for informational purposes only and does not constitute any form of title guarantee nor insurance. The
liability of the company shall not exceed the charge paid by the applicant for this product, nor shall the company be
held liable to any party other than the applicant for this product.
THIS COMMTTMENT IS FOR IIVFORMATION ONLY, AND NO POLICY WILL BE ISSUED
PURSUANT HERETO.
ALTA COMMITMENT
Schedule B - Section 2
(Exceptions) Our Order No. VB50018103
The policy or policies to be issued will contain exceptions to the following unless the same are disposed
of to the satisfaction of the Company:
1. Rights or claims of parties in possession not shown by the public records.
2. Easements, or claims of easements, not shown by the public records.
3. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, and any fac[s which a correct survey and
inspection of the premises would disclose and which are not shown by the public records.
4. Any lien, or right to a lien, for services, labor or material theretofore or hereafter furnished, imposed by law and
not shown by the public records.
5. Defects, liens, encumbrances, adverse claims or other matters, if any, created, fust appearing in the public records or
attaching subsequent to the effecdve date hereof but prior to the date the proposed insured acquires of record for
value the estate or interest or mortgage thereon covered by this Commitment.
6. Taxes or special assessments which are not shown as existing liens by the public records.o the Treasurer's office.
7. Liens for unpaid water and sewer charges, if any..
8. In addition, the owner's policy will be subject to the mortgage, if any, noted in Section 1 of Schedule B hereof.
9. LIENS FOR UNPAID WATER AND SEWER CHARGES, IF ANY.
10. RIGHT OF PROPRIETOR OF A VEIN OR LODE TO EXTRACT AND REMOVE HIS ORE
THEREFROM SHOULD THE SAME BE FOUND TO PENETRATE OR INTERSECT THE PREMISES
AS RESERVED IN UNITED STATES PATENT RECORDED DECEMBER 29, 1920, IN BOOK 93
AT PAGE 42.
11. RIGHT OF WAY FOR DITCHES OR CANALS CONSTRUCTED BY THE AUTHORITY OF THE
UNITED STATES AS RESERVED IN UNITED STATES PATEIVT RECORDED DECEMBER 29,
1920, I1V BOOK 93 AT PAGE 42.
12. WATER AND WATER RIGHTS, DITCH AND DITCH RIGHTS, WHETHER OR 1VOT OF PUBLIC
RECORD.
13. EASEMENT AND RIGHT OF WAY FOR RED SANDSTOIVE CREEK.
14. EASEMENT AS RESERVED BY HOLY CROSS ELECTRIC ASSOCIATION, INC. IN DEED
RECORDED FEBRUARY 21, 1995 IN BOOK 661 AT PAGE 743.
ALTA COMMITMENT
Schedule B - Section 2
(Exceptions) Our Order No. VB50018103
The policy or policies to be issued will contain exceptions to the foilowing unless the same are disposed
of to the satisfaction of the Company:
15. TERMS, CONDITIONS AND PROVISIONS OF GORE CREEK PLACE DEVELOPMENT AGREEMENT
RECORDED MARCH 10, 2005 AT RECEPTIOIV N0. 908751.
16. TERMS, CONDITIONS AND PROVISIONS OF ORDINANCE NO. 32 SERIES 2004 RECORDED
MARCH 10, 2005 AT RECEPTION NO. 908755.
17. TERMS, CONDITIOIVS AND PROVISIONS OF EASEMENT RECORDED SEPTEMBER 21, 2005 AT
RECEPTION NO. 930318.
NOTE: THE POLICY OF TITLE INSURANCE WILL INCLUDE AN ARBITRATIOIV PROVISION.
THE COMPANY OR THE INSURED MAY DEMAND ARBITRATION. ARBITRABLE MATTERS MAY
INCLUDE, BUT ARE NOT LIMITED TO, ANY CONTROVERSY OR CLAIM BETWEEN THE
COMPAIVY AND THE INSURED ARISING OUT OF OR RELATING TO THIS POLICY, ANY
SERVICE OF THE COMPANY IN CONNECTION WITH ITS ISSUANCE OR THE BREACH OF A
POLICY PROVISION OR OTHER OBLIGATION. PLEASE ASK YOUR ESCROW OR TITLE
OFFICER FOR A SAMPLE COPY OF THE POLICY TO BE ISSUED IF YOU WISH TO
REVIEW THE ARBITRATION PROVISIOIVS AND ANY OTHER PROVISIONS PERTAINING TO
YOUR TITLE INSURANCE COVERAGE.
Chicago Tide Insurance Company
ALTA COMMITMENT
Our Order No. VB50018106
Schedule A Cust. Ref.:
Property Address:
RED SANDSTONE ROAD PARCEL, 127/565 VAIL, CO 81657
1. Effective Date: February 02, 2007 at 5:00 P.M.
2. Policyto be Issued,and Proposed Insured:
Information Binder
Proposed Insured:
THE VAIL CORPORATION, A COLORADO CORPORATION
3. The estate or interest in the land described or referred to in this Commitment and covered herein is:
A Fee Simple
4. Title to the estate or interest covered herein is at the effective date hereof vested in:
THE VAIL CORPORATION, A COLORADO CORPORATION
5. The land referced to in this Commitment is described as follows:
THAT PART OF THE PARCEL DESCRIBED IN RIGHT-OF-WAY DEED RECORDED IN BOOK 127 AT
PAGE 565, APRIL 2, 1943 LYING BETWEEN THE SOUTHERLY RIGHT-OF-WAY FOR INTERSTATE
HIGHWAY 70 AND THE NORTHERLY RIGHT-OF-WAY FOR SOUTH FRONTAGE RD, FORMERLY U.S.
HIGHWAY 6.
NOTE:
SAID PARCEL WAS VACATED AS PUBLIC RIGHT-OF-WAY BY ORDINANCE N0. 32, SERIES OF
2004 RECORDED MARCH 10, 2005 AT RECEPTIOIV NO. 908755 COUNTY OF EAGLE, STATE OF
COLORADO.
ALTA COMMITMENT
Schedule B - Section 1
(Requirements) Our Order No. VB50018106
The following are the requirements to be complied with:
Item (a) Payment to or for the account of the grantors or mortgagors of the full consideration for the estate or
interestto be insured.
Item @) Proper instrument(s) creating the estate or interest to be insured must be executed and duly filed for record,
to-wit:
Item (c) Payment of all taxes, charges or assessments levied and assessed against the subject premises which are due
and payable.
Item (d) Additional requirements, if any disclosed below:
This product is for informational purposes only and does not constitute any form of title guarantee nor insurance. The
liability of the company shall not exceed the charge paid by the applicant for this product, nor shall the company be
held liable to any party other than the applicant for this product.
THIS COMMITMENT IS FOR INFORMATION ONLY, AND NO POLICY WILL BE ISSUED
PURSUANT HERETO.
ALTA COMMITMENT
Schedule B - Section 2
(Excepdons) Our Order No. VB50018106
The policy or policies to be issued will contain exceptions to the following unless the same are disposed
of to the satisfaction of the Company:
1. Rights or claims of parties in possession not shown by the public records.
2. Easements, or claims of easements, not shown by the public records.
3. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, and any facts which a correct survey and
inspection of the premises would disclose and which are not shown by the public records.
4. Any lien, or right to a lien, for services, labor or material theretofore or hereafter furnished, imposed by law and
not shown by the public records.
5. Defects, liens, encumbrances, adverse claims or other matters, if any, created, first appearing in the public records or
attaching subsequent to the effective date hereof but prior to the date the proposed insured acquires of record for
value the estate or interest or mortgage thereon covered by this Commitment.
6. Taxes or special assessments which are not shown as existing liens by the public records.o the Treasurer's office.
7. Liens for unpaid water and sewer charges, if any..
8. In addition, the owner's policy will be subject to the mortgage, if any, noted in Section 1 of Schedule B hereof.
RIGHT OF PROPRIETOR OF A VEIN OR LODE TO EXTRACT AND REMOVE HIS ORE
THEREFROM SHOULD THE SAME BE FOUND TO PENETRATE OR INTERSECT THE PREMISES
AS RESERVED IN UIVITED STATES PATENT RECORDED DECEMBER 29, 1920, IN BOOK 93
AT PAGE 42.
10. RIGHT OF WAY FOR DITCHES OR CANALS CONSTRUCTED BY THE AUTHORITY OF THE
UNITED STATES AS RESERVED IN UNITED STATES PATENT RECORDED DECEMBER 29,
1920, IN BOOK 93 AT PAGE 42.
11. WATER AND WATER RIGHTS, DITCH AND DITCH RIGHTS, WHETHER OR NOT OF PUBLIC
RECORD.
12. EASEMENT AND RIGHT OF WAY FOR RED SANDSTONE CREEK.
13. EASEMENT AS RESERVED BY HOLY CROSS ELECTRIC ASSOCIATIOIV, INC. IN DEED
RECORDED FEBRUARY 21, 1995 IN BOOK 661 AT PAGE 743.
14. TERMS, CONDITIONS AND PROVISIONS OF GORE CREEK PLACE DEVELOPMENT AGREEMENT
RECORDED MARCH 10, 2005 AT RECEPTION NO. 908751.
ALTA COMMITMENT
Schedule B - Section 2
(Exceptions) Our Order No. VB50018106
The policy or policies to be issued will contain exceptions to the following unless the same are disposed
of to the satisfaction of the Company:
15. TERMS, CONDITIONS AND PROVISIONS OF ORDINANCE NO. 32 SERIES OF 2004
RECORDED MARCH 10, 2005 AT RECEPTION NO. 908755.
16. TERMS, CONDITIONS AND PROVISIOIVS OF EASEMENT RECORDED SEPTEMBER 21, 2005 AT
RECEPTION NO. 930318.
NOTE: THE POLICY OF TITLE INSURANCE WILL INCLUDE AN ARBITRATION PROVISION.
THE COMPANY OR THE INSURED MAY DEMAIVD ARBITRATION. ARBITRABLE MATTERS MAY
INCLUDE, BUT ARE NOT LIMITED TO, ANY CONTROVERSY OR CLAIM BETWEEIV THE
COMPAIVY AND THE INSURED ARISING OUT OF OR RELATING TO THIS POLICY, ANY
SERVICE OF THE COMPANY IN CONNECTION WITH ITS ISSUANCE OR THE BREACH OF A
POLICY PROVISION OR OTHER OBLIGATION. PLEASE ASK YOUR ESCROW OR TITLE
OFFICER FOR A SAMPLE COPY OF THE POLICY TO BE ISSUED IF YOU WISH TO
REVIEW THE ARBITRATIOIV PROVISIONS AND ANY OTHER PROVISIONS PERTAINING TO
YOUR TITLE INSURANCE COVERAGE.
�.
� TOWN OF YAIL �
�
THIS ITEM MAY AFFECT YOUR PROPERTY
PUBLIC NOTICE
NOTICE IS HEREBY GIVEN that the Planning and Environmental Commission of the
Town of Vail will hold a public hearing in accordance with section 12-3-6, Vail Town
Code, on , July 23, 2007, at 1:00 pm in the Vail Public Library Community Room, in
consideration of:
A request for a final approval of a preliminary plan for a major subdivision, pursuant to
Chapter 13-3, Major Subdivision, Vail Town Code, to allow for the creation of two new
lots for the redevelopment of the properties known as "Ever Vail" (West Lionshead),
located at 862, 923, 934, 953, 1031 South Frontage Road West, and the South Frontage
Road West right-of-way/Unplatted (a complete legal description is available for
inspection at the Town of Vail Community Development Department), and setting forth
details in regard thereto. (PEC07-0020)
Applicant: Vail Resorts Development Company, represented by Thomas Miller
Planner: Warren Campbell
A request for a final recommendation to the Vail Town Council for a zone district
boundary amendment, pursuant to 12-3-7, Amendments, Vail Town Code, to allow for a
rezoning of properties from Arterial Business District and South Frontage Road West
right-of-way which is not zoned to Lionshead Mixed Use 2, properties known as "Ever
Vail" (West Lionshead), located at 953 and 1031 South Frontage Road West and South
Frontage Road West right-of-way, (a complete legal description is available for
inspection at the Town of Vail Community Development Department), and setting forth
details in regard thereto. (PEC07-0021)
Applicant: Vail Resorts Development Company, represented by Thomas Miller
Planner: Warren Campbell
A request for a final recommendation to the Vail Town Council, pursuant to Section 12-3-
7, Amendment, Vail Town Code, for proposed text amendments to Chapter 14-2,
Definitions, Vail Town Code, to provide definitions for terms of art, and to Chapter 14-6,
Grading Standards, Vail Town Code, for proposed changes to the grading, and setting
forth details in regard thereto. (PEC07-0041)
Applicant: Town of Vail
Planner: Rachel Friede
A request for a final review of an amended final plat,
Exemption Plat Review Procedures, Vail Town Code,
envelope, located at 1314 Spraddle Creek Road/Lot 15,
setting forth details in regard thereto. (PEC07-0044)
Applicant: William and Julie Esrey
Planner: Scot Hunn
Page 1
pursuant to Chapter 13-12,
to amend a platted building
Spraddle Creek Estates, and
. I� ��
�
V�
, '� p1
�� J�
�i
� v
A request for a final recommendation to the Vail Town Council, pursuant to Section 12-3-
7, Amendments, Vail Town Code, for proposed text amendments to Title 11, Sign
Regulations, and Title 12, Zoning Regulations, Vail Town Code, to allow for
amendments to regulations pertaining to outdoor display, sales signs, menu boards, and
setting forth details in regard thereto. (PEC07-0043)
Applicant: Town of Vail and Vail Chamber & Business Association
Planner: Rachel Friede
The applications and information about the proposals are available for public inspection
during office hours at the Town of Vail Community Development Department, 75 South
Frontage Road. The public is invited to attend project orientation and the site visits that
precede the public hearing in the Town of Vail Community Development Department.
Please call 970-479-2138 for additional information.
Sign language interpretation is available upon request, with 24-hour notification. Please �►
call 970-479-2356, Telephone for the Hearing Impaired, for information.
Published July 6, 2007, in the Vail Daily.
Page 2
�
�,�: .a,,,.�
*.�+/'1
i
�
�
`
•
Warren Campbell - FW: Ever Vail - area
From: "Allison Ochs Kent" <allison@mpgvail.com>
To: "'Warren Campbell"' <WCampbell@vailgov.com>
Date: 09/20/2007 3:37 PM
Subject: FW: Ever Vail - area
Sorry it took awhile.
Allison Ochs Kent, AICP
Mauriello Planning Group
From: Sam Ecker [mailto:sam@gorerange.net]
Sent: Thursday, September 20, 2007 3:12 PM
To: 'Allison Ochs Kent'
Subject: Ever Vail - area
Hi Allison,
Rough area summary:
Frontage Road (grey) = 168,798 sq. ft.
Cross-hatched parcels to be conveyed to I-70 = 29,020 sq. ft.
Let me know if you need anything else.
Sam
Gore Range Surveying, LLC
PO Box i5
5i29 Longsun Lane
Avon, CO 8i62o
�970)479-8698
(970) 479-0055 (f�)
sam _gorerange.net
� ^��
�� �
J J
�• �I
Page 1 of 1
file://C:�Documents and Settings�Administrator\Local Settings\Temp\GW}00OO1.HTM 09/20/2007
I �'R
�
MEMORANDUM
TO: Planning and Environmental Commission
FROM: Community Development Department
DATE: September 24, 2007
SUBJECT: A request for a final approval of a preliminary plan for a major subdivision,
pursuant to Chapter 13-3, Major Subdivision, Vail Town Code, to allow for the
creation of two new lots for the redevelopment of the properties known as
"Ever Vail" (West Lionshead), located at 862, 923, 934, 953, 1031 South
Frontage Road West, and the South Frontage Road West right-of-
way/Unplatted (a complete legal description is available for inspection at the
Town of Vail Community Development Department), and setting forth details
in regard thereto. (PEC07-0020)
Applicant: Vail Resorts Development Company, represented by Thomas
Miller
Planner: Warren Campbell
1. SUMMARY
� The applicant, Vail Resorts Development Company, represented by Thomas Miller,
is requesting final approval of a preliminary plan for a major subdivision, pursuant to
Chapter 13-3, Major Subdivision, Vail Town Code, to allow for the creation of finro
new lots for the redevelopment of the properties known as "Ever Vail" (West
Lionshead), located at 862, 923, 934, 953, 1031 South Frontage Road West, and the
South Frontage Road West right-of-way/Unplatted (a complete legal description is
available for inspection at the Town of Vail Community Development Department).
The preliminary plan, if approved would result in the establishment of the basis for
developing the final plat for Ever Vail on finro separate parcels. Staff is
recommending approval with conditions of the preliminary plan subject to the
findings and conditions outlined in Section VIII of this memorandum.
11. DESCRIPTION OF REQUEST
The applicant, Vail Resorts Development Company, represented by Thomas Miller,
has recently participated in two work session meetings with the Town of Vail
Planning and Environmental Commission to begin establishing the basis for the
numerous development applications which will be necessary to achieve the
development of Ever Vail. A vicinity map is attached depicting the area known as
Ever Vail (Attachment A). Through the two work sessions it was discussed that a
major subdivision would be need to create new parcels as several properties were
being combined and due to the proposed South Frontage Road right-of-way
relocation to the north, parallel to the interstate. The proposed major subdivision will
create finro (2) lots out of five (5) existing lots and the South Frontage right-of-way.
� The proposed preliminary plan is the first step in the major subdivision process to
establishing the two (2) new lots.
�
This application proposes to shift the South Frontage Road right-of-way to the north �
in order to remove this physical boundary to the development of a contiguous site.
The proposed preliminary plan further more ties the two (2) new lots together as a
single development site with development potential being shared across the
proposed lot line for zoning review purposes. A vicinity map of the development site
and surrounding area has been attached for reference. (Attachment A). A copy of
the proposed preliminary plan (Attachment B) and a document entitled Preliminarv
Plan Request to Facilitate the Redevelopment of West Lionshead dated revised
September 17, 2007, describing the request in greater detail from the applicant
(Attachment C) are attached for reference.
III. BACKGROUND
The Vail Resorts Maintenance Shop was annexed into the Town of Vail by
Ordinance No. 8, Series of 1969, which became effective on August 23, 1969.
The Holy Cross Lot, Vail Professional Building, Cascade Crossing, and former gas
station sites where annexed into the Town of Vail by Ordinance No. 26, Series of
1975, which became effective on December 16, 1975.
On December 11, 2006, the Planning and Environmental Commission forwarded a
recommendation of approval for amendments to the Lionshead Redevelopment
Master Plan to include the Vail Professional Building and Cascade Crossing parcels
within the Master Plan boundaries and to amend the recommendations for the area
known as "West Lionshead". �
On February 6, 2007, the Vail Town Council adopted Resolution No. 4, Series of
2007, which implemented the changes to the Lionshead Redevelopment Master Plan
regarding West Lionshead and the area now calfed Ever Vail.
IV. ROLES OF REVIEWING BOARDS
Planning and Environmental Commission:
Action: The Planning and Environmental Commission is responsible for final
approval, approval with conditions, or denial of a preliminary plan for a major
subdivision. Specifical�y the the code states in Section 13-3-4, Commission Review
of Application; Criteria:
The burden of proof shall rest with the applicant to show that the application
is in compliance with the intent and purposes of this Chapfer, the Zoning
Ordinance and other pertinent regulations that the Planning and
Environmental Commission deems applicab/e. Due consideration shall be
given to the recommendations made by public agencies, utility companies
and other agencies consulted under subsection 13-3-3C above. The
Planning and Environmental Commission shall review the application and
consider its appropriateness in regard to Town policies relating to
subdivision control, densities proposed, regulations, ordinances and
resolutions and other applicable documents, environmental integrity and
compatibility with the surrounding land uses and other applicable �
documents, effects on the aesthetics of the Town."
� Design Review Board:
Action: The Design Review Board has NO review authority on a major subdivision,
but must review any accompanying Design Review Board application.
Town Council:
The Town Council is the final decision making authority for a major subdivision and
the adoption of easements befinreen a private property owner and the Town. Final
actions of Design Review Board or Planning and Environmental Commission maybe
appealed to the Town Council or by the Town Council. Town Council evaluates
whether or not the Planning and Environmental Commission or Design Review
Board erred with approvals or denials and can uphold, uphold with modifications, or
overturn the board's decision.
Staff:
The staff is responsible for ensuring that all submittal requirements are provided and
plans conform to the technical requirements of the Zoning Regulations. The staff
also advises the applicant as to compliance with the design guidelines.
Staff provides a staff memo containing background on the property and provides a
staff evaluation of the project with respect to the required criteria and findings, and a
recommendation on approval, approval with conditions, or denial. Staff also
facilitates the review process.
V. APPLICABLE PLANNING DOCUMENTS
� Town of Vail Zoninq Code:
Title 13: Subdivision Regulations (partial)
13-2-2 Definitions
PRELIMINARY PLAN: The preliminary drawings described in these regulations
indicating the proposed manner or /ayout of the subdivision to be submitted to the
p/anning and environmental commission for approval.
SUBDIVISION OR SUBDIVIDED LAND:
A. Meaning:
1. A tract of land which is divided into two (2) or more lots, tracts, parcels,
sites, separate interests (including leasehold interests), interests in common,
or other division for the purpose, whether immediafe or future, of transfer of
ownership, or for building or other development, or for street use by reference
to such subdivision or recorded plat thereof; or
2. A tract of land including /and to be used for condominiums, timeshare
unifs, or fractional fee club units; or
3. A house, condominium, apartment or other dwelling unit which is divided
into two (2) or more separate interests through division of the fee or title
�
thereto, whether by conveyance, license, /ease, contract for sale or any other �
method of disposition.
8. Exceptions: Unless the method of land disposition is adopted for the purpose
of evading this definition, the term "subdivision" as defined herein shall not
app/y to any of the following divisions of /and or interests in land:
1. The division of land by order of any court in this state or by operation of
law.
2. The division of land by a lien, mortgage, deed of trust or any other security
instrument.
3. The division of /and by a security or unit of interest in any investment trust
regu/ated under the laws of this state or any other interest in an investment
entity.
4. The division of land which creates an interest or interests in oil, gas or
minerals which are now or hereafter severed from the surface ownership of
real property.
5. The division of land by the acquisition of an interest in land in the name of
a husband and wife or other persons in joint tenancy or as tenants in
common and any such interest shall be deemed for purposes of this definition
as only one interest; provided, however, that no agreement exists, either
recorded or unrecorded, between fhe cotenants allowing for the use and
occupancy of the property by one or more cotenants to the exc/usion of one j
or more cotenants during any period, whether annually recurring or not if ���
such agreement is in any way binding or effective upon any assignee or
future owner of a fractional fee interest or if such agreement continues to be
in any way binding or effective upon any cotenant for the sa/e of any interest
in the property.
6. The division of land by reason of the dissolution of a joint venture or other
business entity.
C. Compliance: No subdivision shall be approved which includes e/ements not
in conformance with the provisions of any applicable zoning ordinance or
other ordinance of the town or law or regulations of the state.
D. Major Subdivision: Any subdivision involving more fhan four (4) lots, or a
subdivision proposal without all lots having frontage on a public or approved
street, or with a request to extend municipal facilities in a significant manner,
or a proposal which would negative/y affect the natura/ environment as
determined under section 12-12-2, "Applicability", of this code, or if the
proposal wou/d adversely affecf the development of the remainder of the
parcel or the adjacent property.
�
13-3 Major Subdivisions (in part)
�,.. 13-3-3, Preliminary Plan
A. Preliminary Presentation To Planning And Environmental Commission:
Consideration of a major subdivision proposal shall be formally considered
with a preliminary plan presentation by the subdivider and/or his/her
representative(s) to the planning and environmental commission at a
regularly scheduled meeting. This preliminary presentation shall be a
public hearing according to section 12-3-6 of this code. The presentation
shall reflect the proposed development for an entire same ownership and
shall indicate all adjacent lands owned or under option to the subdivider at
the time of subdivision.
B. Submittal Requirements: At least thirty (30) days prior to the preliminary
plan presentation to the planning and environmental commission, the
subdivider shall submit at a scale of one inch equals one hundred feet (1"
= 100') or larger, twelve (12) copies of each of the following (exceptions
can be granted on individual items by the director of public works or the
administrator) to the department of community development:
1. The environmental impact report required.
2. A topographic survey with a north arrow, graphic scale, dimensioned to
nearest foot prepared by a Cotorado registered land surveyor, shall be
submitted including the following information:
�, a. Boundary lines.
b. Preliminary proposed lots and blocks with numbers and sizes.
c. Easements: location, width and purpose.
d. Proposed streets, their widths of right of way and pavement,
approximate grades in percentage and center line radii of curves;
areas with cuts and fills exceeding six feet (6') and extent thereof.
e. Utilities on and adjacent to the tract, including their type, location,
size and invert elevations of sanitary sewers, storm drainage facilities
and water mains. If utilities are not found on the tract, distance to,
direction of, and size and elevations of the nearest utilities should be
indicated.
f. Contour intervals of no less than two feet (2') if the site is two (2)
acres or less; contour intervals of five feet (5') or less if the tract is
more than two (2) acres, elevations to be based on USGS datum.
g. Drainage conditions on and adjacent to the tract including location
and extent of watercourses, areas of 100-year floodplain (verified by
a registered professional engineer in state of Colorado), perpetual
drainage easements and location of natural springs and ground
water.
�
h. Existing conditions on adjacent land: The area within finro hundred
feet (200') from each subdivision boundary should be included in the �
preliminary plan to show its land slope percentage, zoning, location
of physical improvements and land uses, owners of said property,
division of property into lots or tracts including subdivision names
and any significant natural features. The objective of showing how
the preliminary plan interfaces with all adjoining properties and uses
thereof should be met.
i. Existing zoning.
j. All areas of forty percent (40%) slope or greater, and avalanche areas
indicated as shaded areas.
k. Letters from all applicable utility agencies verifying service.
I. Indications showing that access to the subdivision is via a maintained
public road.
m. Soil stability analysis.
C. Agencies Review:
1. The administrator shall inform any of the following agencies that copies
of the preliminary plan are available for review and comment.
Notification shall be mailed at least fifteen (15) days prior to the date set
by the planning and environmental commission for public hearing:
�
a. Department of public works.
b. Town fire department.
c. Town police department.
d. Public Service Company of Colorado.
e. Holy Cross Electric Association.
f. U.S. West.
g. Cablevision company serving the area.
h. National forest service.
i. Eagle River water and sanitation district.
j. Vail recreation district.
k. Eagle County ambulance district.
I. Other interested agencies when applicable.
2. Such agencies shall be required to make recommendations and
comments within fifteen (15) days from the date of receipt of notification
that the preliminary plan is available for review. Failure to make .,�
�
recommendations and/or comments within the prescribed fifteen (15)
day period shall be deemed approval of the preliminary plan.
Lionshead Redevelopment Master Plan (in part)
Chapter 2 — Introduction (in part)
2.3 Policy Objectives
The Town Council adopted six policy objectives on November 4, 1996 to
outline the important issues to be addressed in the master plan and to
provide a policy framework for the master planning process.
2.3.1 Renewal and Redevelopment
Lionshead can and should be renewed and redeveloped to become a
warmer, more vibrant environment for guests and residents.
Lionshead needs an appealing and coherent identity, a sense of
place, a personality, a purpose, and an improved aesthetic character.
2.3.2 Vitality and Amenities
We must seize the opportunity to enhance guest experience and
community interaction through expanded and additional activities and
amenities such as performing arts venues, conference facilities, ice
rinks, streetscape, parks and other recreational improvements.
� 2.3.3 Stronger Economic Base Through Increased Live Beds
�
�J
In order to enhance the vitality and viability of Vail, renewal and
redevelopment in Lionshead must promote improved occupancy rates
and the creation of additional bed base ("live beds" or "warm beds")
through new lodging products. Live beds and warm beds are best
described as residential or lodging rooms or units that are designed
for occupancy by visitors, guests, individuals, or families on a short
term rental basis. In order to improve occupancy rates and create
additional bed base in Lionshead, applications for new development
and redevelopment projects which include a residential component
shall provide live beds in the form of accommodation units, fractional
fee club units, lodge dwelling units, timeshare units, attached
accommodation units (i.e, lock-off units), or dwelling units which are
included in a voluntary rental management program and available for
short term rental. Further, it is the expressed goal of this Plan that in
addition to creating additional bed base through new lodging products,
there shall be no net loss of existing live beds within the Lionshead
Redevelopment Master Plan study area.
2.3.4 Improved Access and Circulation
The flow of pedestrian, vehicular, bicycle and mass transit traffic must
be improved within and through Lionshead.
�
2.3.5 Improved Infrastructure �
The infrastructure of Lionshead (streets, walkways, transportation
systems, parking, utilities, loading and delivery systems, snow removal
and storage capacity) and its public and private services must be
upgraded to support redevelopment and revitalization efforts and to
meet the service expectations of our guests and residents.
2.3.6 Creative Financing for Enhanced Private Profits and Public
Revenues
Financially creative and fiscally realistic strategies must be identified
so that adequate capital may be raised from all possible sources to
fund desired private and public improvements.
Chapter 4— Recommendations — Overall study Area (in part)
4.1.5 West Lionshead - Residential/ Mixed-Use Hub
The western end of Lionshead, currently undeveloped, is home to parking
lots, the Vail Associates service yard, the Vail sanitation plant, the old town
shops, a former gas station, the Vail Professional Building, and Cascade
Crossing. This area of Lionshead is generally under utilized and from an
aesthetic standpoint is not in keeping with what the Town would like to see
Lionshead become as it redevelops in the coming years. The Town of Vail
does place a high value on maintaining the office and retail areas in West
Lionshead and any redevelopment should reasonably increase the square
footage of existing office and have "no net loss" of retail square footage in �,;
West Lionshead.
With their recent acquisition of additional properties in this area, Vail Resorts
has the opportunity to bring lift service to this part of Lionshead. Lift service
brings with it great potential for the re-development of this area and in doing
so expand all of Lionshead to the west with improved pedestrian connections,
new retail and office activity and other improvements. While lift access will
certainly energize this area during the winter months, attention should be
given to creating a year-round attraction within this area of Lionshead (see
detailed plan recommendations in Chapter 5)
The master plan recommends that this hub become a residential/ mixed use
area with an emphasis on meeting the needs of both the local community and
our guests. Appropriate uses could include high density residential
development, lodging, community and visitor based office and retail space,
employee housing and parking, bus or transit functions and a ski lift
connection to `Vail Mountain. The catalyst for this mixed use hub is ski lift
access to Vail Mountain. Consideration should be given to integrating
employee housing into the redevelopment of West Lionshead in accordance
with the Town's employee housing policies and regulations. To the extent
possible development patterns in this area should reflect north-south
orientation of buildings, visual penetrations to the mountain, and a pedestrian
oriented environment. The degree of north-south building orientation may be
difficult given the relatively narrow east-west orientation of this area. In �
addition, the introduction of ski lift access in this location creates a catalyst for
f an structured public parking facility. All service and delivery demands created
(` by development in this area shall be accommodated on-site.
The site will continue to accommodate the existing and potentially expanded
functions of the Vail sanitation plant. The mountain service yard could be
reduced in size, as some functions can be moved to less central locations. It
may also be possible to relocate the entire mountain service yard to a new
location in the West Lionshead area which would allow for greater flexibility in
the redevelopment of this site. However as the area develops it is critical that
new uses be connected to the primary pedestrian corridors and that they be
served by the Town of Vail in-town transit system.
Chapter 5— Detailed Plan Recommendations (in part)
5.17 West Day Lot/ Vail Associates Service Yard/ Holy Cross Site/ Gas
Station Site/ Vail Professional Building/ Cascade Crossing
Planning for the western end of Lionshead must consider finro different
scenarios: the realignment of South Frontage Road and its retention in the
existing alignment.
While the introduction of lift service is viable in either of these Frontage Road
alternatives, site design will vary depending upon what happens to the
Frontage Road alignment. See Figures 49a, and 4-9b for the Frontage Road
realignment alternatives. Nofinrithstanding these different Frontage Road
� scenarios there should be an increase of existing office square footage and
"no net loss" of retail square footage as a result of the redevelopment of
these parcels. Higher densities and building heights may be appropriate in
this area, particularly to encourage the development of employee housing.
However, any development must meet the overall character and visual intent
of the master plan and be compatible with the adjacent existing development
of the Marriott and the Vail Spa.
As compared to a separate, free-standing portal, West Lionshead is
considered a part of the greater Lionshead area. In order for this area to be
successful, it is important to have a strong pedestrian connection with the rest
of Lionshead. A strong connection along the Gore Creek corridor already
exists. Streetscape improvements along West Lionshead Circle befinreen
Concert Hall Plaza (currently the western end of Lionshead retail influence)
and the Ritz-Carlton Residences will strengthen existing conditions, and in
doing so, improve the viability of mixed uses in West Lionshead.
Improvements to street lighting, walking surfaces, seating areas and public
art are just some examples of what could strengthen this corridor and in
doing so further integrate this area with the rest of Lionshead.
The development of a strong pedestrian connection between the Lionshead
Core area and the western side of Lionshead wi�l encourage pedestrian
activity in this area and in doing so will energize all of West Lionshead.
During the winter months the ski lift and associated parking will generate
� significant pedestrian traffic and activity. However, consideration should be
given to how West Lionshead can be an active and vibrant place year-round.
This could be accomplished in any number of ways. For example, quality �
architecture and the creation of appealing outdoor spaces in and of itself will
encourage people to visit this area. This could be reinforced by a well-crafted
program of specialty retailers, offices, and restaurants. An active program of
public art, residential units that are used for "artists in residence", a culinary
school, improved access to and utilization of Gore Creek or Red Sandstone
Creek for fishing or other purposes or specific recreation features such as a
climbing wall are just some examples of design elements or land uses that
could create a catalyst for activity. In conjunction with any application to
development a new ski lift, a retail/commercial market study which analyzes
the area for the appropriate amount of square footage of retail/commercial
that should be included in the redevelopment of West Lionshead shall be
provided.
It is assumed that the development standards of Lionshead Mixed Use 1 or 2
will guide the design of redevelopment in this area. Notwithstanding the
height allowances of these zone districts, building height and massing shall
be responsive to the Gore Creek corridor, the Interstate, and how building
massing transitions at the western end of Lionshead. Buitdings at the
westernmost end of West Lionshead shall gradually "step down" from the
maximum allowable height limits of the Lionshead Mixed Use zone districts.
Figure 5-25 provides a general depiction of how building height shall
gradually lower at the western end of this study area. The intent of these
height standards is that building height reduces by entire floor levels in the
locations as generally depicted on Figure 5-25. Nofinrithstanding the height
allowances depicted on Figure 5-25, buildings fronting directty along Gore �
Creek and the western end of Lionshead shall express no more than three to
four levels before "stepping back" to taller building mass. On the Interstate
side of this area building design shall be articulated to avoid large expanses
of shear/unbroken wall planes.
a. Retention of Existinq Frontage Road Aliqnment
If the Frontage Road remains in its current location the Maintenance
Yard/Holy Cross parcels, the Vail Professional Building and /Cascade
Crossing all remain viable development sites. The most viable site for
a public parking facility would be the Maintenance Yard/Holy Cross
parcels. While other lift locations are feasible, the old gas station site
is a viable location for a base terminal. This location would require a
grade separated pedestrian crossing over the Frontage Road to the
Maintenance Yard/Holy Cross parcels. A strong east-west oriented
pedestrian corridor with ground floor retail uses would be necessary to
create a strong connection between this area and the rest of
Lionshead. Under this Frontage Road scenario the Vail Professional
Building and Cascade Crossing could be developed as a contiguous
parcel. It is assumed that these parcels would be re-zoned to
Lionshead Mixed Use I. The Holy Cross site and the Vail Professional
Building both abut Red Sandstone Creek. Any redevelopment of
these parcels should consider how the Creek can be enhanced and
made an asset or amenity of this redevelopment area. .
�
�o
� b. Frontaqe Road Realiqnment behind the Maintenance Yard and Holv
Cross site
The greatest benefit of this realignment alternative is that it results in
one very large and contiguous development parcel and in doing so
integrates the Maintenance Yard/Holy Cross site with the West Day
Lot by removal of the barrier created by the existing Frontage Road
alignment. It also creates the best pedestrian environment in creating
an extension of the Lionshead Retail area in that it provides the
potential to establish a convenient and desirable pedestrian
connection to the rest of Lionshead. With this alternative the most
viable site for a public parking facility would still be the Maintenance
Yard/Holy Cross parcels. With the re-location of the Frontage Road
lift access out of the old gas station site would not require a grade
separated pedestrian crossing to the Maintenance Yard/Holy Cross
parcels. However, a grade separated crossing over the re-located
Frontage Road would be needed to link the Holy Cross site with the
Vail Professional Building. This alternative would also present the
opportunity for relocating and/or enhancing Red Sandstone Creek to
make it more accessible to the community and an aesthetically
pleasing water feature. One possibility may be to pond the creek just
south of the I-70 corridor and diverting all or a portion of the flow
underneath the new Frontage Road in order to bring "live wate�"
through the western end of the Holy Cross site. Any modification or
enhancement to the creek corridor would be subject to U.S. Army
Corp of Engineers approval. A strong east-west oriented pedestrian
� corridor with ground floor retail uses would be necessary to create a
strong connection befinreen this area and the rest of Lionshead.
Vail Land Use Plan (in part)
The goals articulated here reflect the desires of the citizenry as expressed through
the series of public meetings that were held throughout the project. A set of initial
goals were developed which were then substantially revised after different types of
opinions were brought out in the second meeting. The goal statements were
developed to reflect a general consensus once the public had had the opportunity to
reflect on the concepts and ideas initially presented. The goal statements were then
revised through the review process with the Task Force, the Planning and
Environmental Commission and Town Council and now represent policy guidelines
in the review process for new development proposals. These goal statements
should be used in conjunction with the adopted Land Use Plan map, in the
evaluation of any development proposal.
The goal statements which are reflected in the design of the proposed Plan are as
follows:
1. General Growth / Development
1.1 Vail should continue to grow in a controlled environment, maintaining
a balance between residential, commercial and recreational uses to
� serve both the visitor and the permanent resident.
11
1.2 The quality of the environment including air, water and other natural �
resources should be protected as the Town grows.
1.3 The quality of development should be maintained and upgraded
whenever possible.
1.5 Commercial strip development of the Valley should be avoided.
1.7 New subdivisions should not be permitted in high geologic hazard
areas.
1.8 Recreational and public facility development on National Forest lands
may be permitted where no high hazards exist if:
a) Community objectives are met as articulated in the Comprehensive
Plan.
b) The parcel is adjacent to the Town boundaries, with good access.
c) The affected neighborhood can be involved in the decision-making
process.
1.12 Vail should accommodate most of the additional growth in existing
developed areas (infill areas).
1.13 Vail recognizes its stream tract as being a desirable land feature as
well as its potential for public use.
2. Skier /Tourist Concerns
2.1 The community should emphasize its role as a destination resort while
accommodating day visitors.
2.2 The ski area owner, the business community and the Town leaders
should work together closely to make existing facilities and the Town
function more efficiently.
2.3 The ski area owner, the business community and the Town leaders
should work together to improve facilities for day skiers.
2.4 The community should improve summer recreational options to
improve year-round tourism.
2.5 The community should improve non-skier recreational options to
improve year-round tourism.
2.7 The Town of Vail should improve the existing park and open space
lands while continuing to purchase open space.
,..►�
2.8 Day skier needs for parking and access should be accommodated
through creative solutions such as:
a) Increase busing from out of town. �
12
�
b) Expanded points of access to the mountain by adding
additional base portals.
c) Continuing to provide temporary surface parking.
d) Addition of structured parking.
3. Commercial
3.2 The Village and Lionshead areas the best location for hotels to serve
the future needs of destination skiers.
3.3 Hotels are important to the continued success of the Town of Vail,
therefore conversion to condominiums shou►d be discouraged.
3.4 Commercial growth should be concentrated in existing commercial
areas to accommodate both local and visitor needs.
3.5 Entertainment oriented business and cultural activities should be
encouraged in the core areas to create diversity. More night-time
businesses, on-going events and sanctioned "street happenings"
should be encouraged.
4. Village Core / Lionshead
4.1 Future commercial development should continue to occur primarily in
existing commercial areas. Future commercial development in the
� Core areas needs to be carefully controlled to facilitate access and
delivery.
5. Residential
5.1 Additional residential growth should continue to occur primarily in
existing, platted areas and as appropriate in new areas where high
hazards do not exist.
5.2 Quality time share units should be accommodated to help keep
occupancy rates up.
5.3 Affordable employee housing should be made available through
private efforts, assisted by limited incentives, provided by the Town of
Vail, with appropriate restrictions.
5.4 Residential growth should keep pace with the market place demands
for a full range of housing types.
5.5 The existing employee housing base should be preserved and
upgraded. Additional employee housing needs should be
accommodated at varied sites throughout the community.
6. Community Services
� 6.1 Services should keep pace with increased growth.
13
VI.
VII.
C:�%
6.3
The Town of Vail should play a role in future development through
balancing growth with services.
Services should be adjusted to keep pace with the needs of peak
periods.
SUROUNDING LAND USES AND ZONING
Land Use
North: Interstate 70
East: Mixed-use
West: Mixed-use
South: Open Space
SITE ANALYSIS
Zoninq
No zonrng
Lionshead Mixed Use 1
SDD No. 4, Cascade Village
Natural Area Preservation
Proposed Lot 1, Ever Vail Preliminary Plan
Comprised of the Vail Resorts Maintenance Yard, Holy Cross Lot, former gas station
sites, and a portion of the South Frontage Road right-of-way
Current Zoning of Parcels: Lionshead Mixed Use-2 District and unzoned
Land Use Plan Designation: Lionshead Redevelopment Master Plan
Current Land Use: Industrial
Development Standard
Lot Area:
Dimension:
Frontage:
Access:
Allowed
10,000 sq. ft.
80'X80' min
Proposed
330,402 sq. ft.
exceeds 320'X320'
30' min. Approximately 800 feet along the
realigned South Frontage Road
and 500 feet along the realigned
West Forest Road
Access to the site will be via the South Frontage Road
and West Forest Road.
Proposed Lot 2, Ever Vail Preliminary Plan
Comprised of the Vail Professional Building and Cascade Crossing sites, and a
portion of the South Frontage road right-of-way.
Zoning: Arterial Business District
Land Use Plan Designation: Community Office
Current Land Use: Retail/Commercial and office
Development Standard Allowed Proposed
Lot Area: 10,000 sq. ft. 156,206 sq. ft.
Dimension:
80'X80' min. exceeds 220'X 220'
14
�
,.r+�
�
�
VIII.
Frontage:
Access:
30' min
Approximately 900 feet along the
realigned South Frontage Road
Access to the site will be via the South Frontage Road.
APPLICATION CRITERIA AND FINDINGS
Before recommending approval, approval with conditions or disapproval of the
preliminary plan, the planning and environmental commission shall consider the
following criteria with respect to the proposed subdivision:
1. The extent to which the proposed subdivision is consistenf with all the applicab/e
elements of the adopted goals, objectives and policies outlined in the Vail
comprehensive plan and is compatible with the development objectives of the
town; and
Staff Response:
The redevelopment of the properties incorpQrating the Ever Vail project began in
early 2006, with the start of public meetings and hearings to discuss incorporation
of several parcels into the Lionshead Redevelopment Master Plan and
amendments to the Master Plan for the area known as "West Lionshead". In early
2007, Town Council adopted, through resolution, the amendments to the Master
Plan that evolved over a year of public process.
The proposed Ever Vail Preliminary Plan is one of the steps in effecting the
� change in Ever Vail that was anticipated through the adoption of the changes to
the Master Plan. Staff has reviewed the proposed preliminary plan and found it to
be in compliance with the multiple elements of the Vail Comprehensive Plan.
Within Section V of this memorandum staff provided the Policies and Goals
identified in both the Lionshead Redevelopment Master Plan and the Vail Land
Use Plan which apply to this request.
�
The proposed preliminary plan will be the basis for creating the foundation from
which many of the policies and goals of the Vail Comprehensive Plan can be
achieved. From the relocation of the South Frontage Road, redevelopment and
improvement of the Vail Resorts service yards, to the enhancement of the Red
Sandstone Creek, and to the incorporation of a new mixed-use portal to access
the mountain, the proposed preliminary plan will allow these and other elements
to be achieved.
Moving forward through the redevelopment process, staff believes that the
incorporation of the Red Sandstone Creek, through the establishment of a stream
tract, should be achieved. This addition to the existing stream tract system the
Town currently has will address Goals 1.2 and 1.13 of the Vail Land use Plan.
Staff believes that this can be accomplished in a manner that will not negatively
affect the development potential of the proposed redevelopment in terms of the
maximum and minimum standards required by the Vail Town Code.
Staff believes the proposed preliminary plan complies with this criterion.
2. The extent to which the proposed subdivision complies with all of the standards of
this title, as well as, but not limited to, title 12, "Zoning Regu/ations'; of this code,
15
and other pertinent regulations that the p/anning and environmental commission �
deems applicable; and
Staff Response:
The Town Staff, especially the Planning and Public Works Departments have
been working extensively on the proposed Ever Vail Preliminary Plan. Staff has
ensured that the requirements of Chapter 13-3, Major Subdivisions, Vail Town
Code, have been adhered to. Staff has been working diligently with the applicant
on several issues, the largest being the plans for the relocation of the South
Frontage Road to the north to parallel the interstate and the generation of traffic
reports which attempt to anticipate the traffic generation of the proposed uses
within Ever Vail. Staff believes the proposed preliminary plan depicts a layout of
new rights-of-way for the South Frontage road and West Forest Road. Staff
further believes that the proposed roundabout located at the eastern edge of
proposed Lot 1 is adequate to handle the anticipated traffic generated by current
uses in the Town and those proposed within Ever Vail. However, as the project
moves forward the Federal Highway Administration (FHWA) and Colorado
Department of Transportation (CDOT) will be reviewing the plans proposed for the
relocation of the South Frontage road and the roundabout and may require
changes to be made to the design. Furthermore, the traffic studies analyzing the
current traffic impacts and future impacts of Ever Vail with regard to the design of
the South Frontage road and the roundabout continue to proceed as the project
evolves. The outcome of the FHWA and CDOT review and the continued traffic
analysis may result in changes to the South Frontage Road and the proposed
roundabout. Staff does believe the currently proposed Ever Vail Preliminary Plan �
is achievable, with exception to the items listed above.
Staff believes the proposed preliminary plan complies with this criterion.
3. The exfent to which the proposed subdivision presents a harmonious, convenient,
workable relationship among land uses consistent with municipal development
objectives; and
Staff Response:
The proposed preliminary plan is the first step in the adoption of a final plat for the
subdivision that would become known as Ever Vail. From the development and
review of the amendments to the Lionshead Redevelopment Master Plan and the
review of the proposed preliminary plan staff believes that the proposed
subdivision will result in a harmonious, convenient, and workable relationship
among adjacent land uses. The proposed redevelopment of the area known as
Ever Vail will take into account the challenges of locating adjacent to a water and
sewage treatment facility.
Staff believes the proposed preliminary plan complies with this criterion.
4. The extent of the effects on the future development of the surrounding area; and
Staff Response:
They redevelopment of the area know as Ever Vail will be of a large scale and will �
have significant effects on the area. However, this development is located on the
16
� western edge of the developed Lionshead Core which contains multiple projects
of a large scale and to the east of the proposed project is a large distance of no
development until the eastern edge of the Cascade Village development. Staff
believes that the effects of the proposed Ever Vail Redevelopment will be positive
to the surrounding areas as it will be a continuation of Lionshead and will provide
a great deal of mixed-uses which will serve the new portal created in Ever Vail
and the larger Lionshead area.
Staff believes the proposed preliminary plan complies with this criterion.
5. The extent to which the proposed subdivision is located and designed to avoid
creating spatia/ patterns that cause inefficiencies in the delivery of public services,
or require duplication or premature e�ension of public facilities, or result in a
"leapfrog" pattern of development; and
Staff Response:
The proposed preliminary plan will result in the planned subdivision of land to
accomplish multiple goals found within the Vail Comprehensive Plan. The
incorporation of the properties found within Ever Vail into the Lionshead
Redevelopment Master Plan will result in planned redevelopment with the ability
to anticipate impacts. The proposed preliminary plan will not result in a in a
"leapfrog" pattern or spatial patterns that cause inefficiencies.
Staff believes the proposed preliminary plan complies with this criterion.
�, 6. The extent to which the
population of the service
undersized lines; and
�
Staff Response:
ufility lines are sized to serve the planned ultimate
area to avoid future land disruption to upgrade
Per the requirements of the 13-3-3C, Preliminary Ptan, Vail Town Code, staff sent
a cover letter and attached plans for the proposed Ever Vail Preliminary Plan to all
the reviewing agencies identified within the Code. It has be more than 15 days
since that letter was sent and per the Code, the agencies have 15 days to make
recommendations or comment. No contact from these agencies was received
and therefore per the requirements of Section 13-3-3C(2), Preliminary Plan, Vail
Town Code, the Preliminary Plan is deemed approved.
There will undoubtedly need to be relocation of utility and service lines for most if
not all of the utilities. In fact most services will need to be upgraded and resized
to accommodate the growth proposed within Ever Vail. Staff has been working
closely with several of the utility companies throughout the adoption of the
amendments to the Lionshead Redevelopment Master Plan and through this
process and the availability of services does not appear to be of concern for the
utility companies.
Staff believes the proposed preliminary plan complies with this criterion.
7. The extent to which the proposed subdivision provides for the growth of an orderly
viable community and serves the best interests of the community as a whole; and
17
Staff Resaonse:
The proposed preliminary plan will result in the growth of an orderly viable
community that serves the best interests of the community as it will accomplish
multiple goals found within the Vail Comprehensive Plan, which are listed in
Section V of this memorandum. The incorporation of the properties found within
Ever Vail into the Lionshead Redevelopment Master Plan will result in planned
redevelopment with the ability to anticipate impacts and serve the interests of the
community.
Staff believes the proposed preliminary plan complies with this criterion.
8. The extent to which the proposed subdivision resu/ts in adverse or beneficial
impacts on the natural environment, including, but not limited to, water quality, air
quality, noise, vegetation, riparian corridors, hillsides and other desirab/e natural
features; and
Staff Response:
The proposed Ever Vail Preliminary Plan and the possible redevelopment of the
area will result in improvement and protection for Red Sandstone Creek and the
incorporation of green building techniques within the project. The possible
redevelopment is proposed to incorporate LEED design standards and other
green building techniques.
�
9. Such other factors and criteria as the commission and/or council deem applicable
to the proposed subdivision.
,..�
Before recommending and/or granting an approval of an application for a major
subdivision, the planning and environmental commission shall make the following
findings with respect to the proposed major subdivision:
1. That the subdivision is in compliance with the criteria listed in subsection A of this
section.
2. That the subdivision is consistent with the adopted goals, objectives and policies
outlined in the Vail comprehensive plan and compatible with the development
objectives of the town.
3. That the subdivision is compatible with and suitable to adjacent uses and
appropriate for the surrounding areas.
4. That the subdivision promotes the health, safety, morals, and general welfare ot
the fown and promotes the coordinated and harmonious deve/opment of the town
in a manner that conserves and enhances its natural environment and its
established character as a resort and residential community of the highest quality.
IX. STAFF RECOMMENDATION
The Community Development Department recommends that the Planning and
Environmental Commission approves with conditions the preliminary plan for the
Ever Vail Subdivision, pursuant to Chapter 13-3, Major Subdivision, Vail Town Code, �
to allow for the creation of two new lots for the redevelopment of the properties
18
� known as "Ever Vail" (West Lionshead), located at 862, 923, 934, 953, 1031 South
Frontage Road West, and the South Frontage Road West right-of-way/Unplatted (a
complete legal description is available for inspection at the Town of Vail Community
Development Department), and setting forth details in regard thereto.
Should the Planning and Environmental Commission choose to approve this
preliminary plan, the Community Development Department recommends the
Commission pass the following motion:
The P/anning and Environmental Commission approves with conditions the
preliminary p/an for the Ever Vail Subdivision, pursuant to Chapter 13-3, Major
Subdivision, Vail Town Code, to allow for the creation of two new lots for the
redevelopment of the properties known as "Ever Vail" (West Lionshead), located at
862, 923, 934, 953, 1031 South Frontage Road West, and the South Frontage
Road West right-of-way/Unp/atted (a complete legal description is available for
inspection at the Town of Vail Community Deve/opment Department), and setting
forih details in regard thereto.
Should the Planning and Environmental Commission choose to approve this
pretiminary plan, the Community Development Department recommends the
Commission make the following findings:
Pursuant to Section 13-3-4, Commission Review of Application: Criteria, Vail
Town Code, the applicant has proven by a preponderance of fhe evidence before
� the P/anning and Environmental Commission that the subdivision is in compliance
with the criteria listed in Subsection A of this section; that the subdivision is
consistent with the adopted goa/s, objectives and policies outlined in the Vail
comprehensive plan and compatible with the development objectives of the town;
that the subdivision is compatible with and suitable to adjacent uses and
appropriate for the surrounding areas; and that the subdivision promotes the
health, safety, morals, and general welfare of the town and promotes the
coordinated and harmonious development of the town in a manner that conserves
and enhances its natural environment and its established character as a resort
and residential community of the highest quality.
Should the Planning and Environmental Commission choose to approve this
preliminary plan, the Community Development Department recommends the
Commission apply the following conditions:
1. That the applicant cannot proceed forward with the review and approval of a
final plat for Ever Vail until such time as the Federal Highway Administration, the
Colorado Department of Transportation, and the Town of Vail has approved the
relocation and design of the South Frontage Road, West Forest Road, and the
location of the proposed roundabout.
2. That the applicant shall provide adequate Right of Way for the construction of a
two lane roundabout if the single lane roundabout does not provide sufficient
excess capacity for the long term future. The current preliminary analysis
� indicates the need for a single lane roundabout, however it would not be prudent
to eliminate the ability to increase the size of the roundabout in the future by
19
confining it by private property/buildings. Based on current trends and similar �
designs the needed excess capacity may be between 30%-50%, this shall be
further analyzed and reviewed within the final Traffic Report. Any necessary
changes to the roundabout design based on the final approved Traffic Impact
Report shall be shown on the plans submitted #or review and approval in
conjunction with the Ever Vail Final Plat.
3. That the applicant establishes a stream tract for the Red Sandstone Creek and
provides this tract to the Town of Vail for inclusion into the stream tract system.
The stream tract shall be depicted upon the plans submitted for review and
approval of the Ever Vail Final Plat.
X. ATTACHMENTS
A. Vicinity Map
B. Copy of the proposed preliminary plan
C. Copy of a applicanYs document entitled Preliminarv Plan Request to Facilitate
the Redevelopment of West Lionshead dated revised September 17, 2007
D. Public notice
�
�
20
�., °` . t ' 4�� '� `�1 � o
�. . . . ��.(�i �. -, {.�y"�.�.� a �i '.. f �y� i� - , � r - n , ._..,��
"i � P {e - `.r � I W r� y .�—
2 �' � T' _ � �
^�4 '`4 4 d�'� ,,�����,�4 .-.. � xb. �f � . 'i���e.x'ki��
r �. W :��, � ,' 3 d3wx `.'7�_ t. ,s a,�'L.
. . �
'K 6 G . , � .!� d < y }. 5 1 - _� �L� � . .
y .,� � ' ..% 1 ♦ � . 1 L.'� ` _'�—'—
j f ' i�
" "` �tt u.: 4 r . �' � .
�,.. ( : . ,.;, ,
,% J F � F ` �...f ,e � j j �� �. R .
fi x
� � t ' ; ./ � ..,
� ' 3.. � z �� (� � � ;�} ` � -'
� x .f+�. � )" . — ."
§ .. �, t � F.. .R �a 'T i _t y; ,,s _. _
�, �q {�-.!' 1 �iq� '. 3 I � �
r` ' � . e � f� � ::a :. ' f
�x:�.. C} ._� . � '�l � � f I �.. �'���iy�7� �.�i`�4'i.{ � 'PS J�.
y .�; ��-� "�cP: �i '�(� � 4 �'�k. � �e' x:
. . � 5
� � 4t � }
' �} * � � +Y � _ �� y ; s,�>X � � Y a-.r�
r
„
,;
^- �+�
• '�� . i - � - _-
.�+'.: � k,,,s ` k �i� ���',�.r""-' � � t • Y Y
• y, i. �'ip 'k' � . .�
� � W 4 � h `�3+[,,� ;z;e. � ' :
i r. "` ., ^� .. �-° _ : � � . .
,.,�; �'�v � �, �� �
�. f Y
• � �� `. � : ��, � � � •
ns `:
� � ,' .' '°�,� �
e,�
y�, �
t �
n p k ( 5
1 � 'l+i. � ) € \ _.: t - Q ° t'j'
� ,n . � � _-� . . " i�'.
� �'.e x r...
� � , `' � ,
,�'�,�. �t � �.^: !► . � ' `
� ,. �� • ''t ' _ t� ' . . , �
• `�t t" �'.�' `Y 4' i >j �. . .
• -v:a �. -" �:.,t. ; ;: ` . • .t'
i i A} s�';,t�. t i'' tt. ; .
e�. .
x, �' p�. 'E �r �'� ��.
� ,, � �;.� * • �j • ^:- '. � ,
k
1 � � ��t �: � .
�ir� ,.; � ,� . .
.. S �P± � r ��� + l. '
� �� c a
.� . e ,��
� � .. a4 ,� � I � t`� e
` ' ^c'i
fM.� .. �:� �:. g y �af " .
"y ,+" R �
� �'t { � �� a �u
' • R ��� �� �`�t . � � +5��� �",� � �
� � + , ° ,
„�,�„�_f�,h°..+�.-.. � k�, ���. �,4d: {� w` �. a � s �� .!* ,r, , f ` a .
� '�' ♦.ti �. '� �m. � '�` .iF' '� 'A, .
�¢` '��S ' ' :_.r� �� .P .�,"kb • �i. , d a 5 , � ..
r srm-� �a �k � .� "4y. a�i + „ ¢'S '`j ' .
� � :, � .8 xd 4:� ; � .
, iy � �- �� �'[ � . i .
�'�'k r�y..; �' Yy�i' �' ^ t' • ��' , ' �.: .
t
• f� � - 4^. t � "t ���y, �.'i� j X tf . � . .
y'QibR �:. :. ,� 1 ..,i A g?R. , tk"
�'
x.. � q,. -. � � � �F � .. . - .:
� `��F� � , .:�
• t i � � t
'� �� K �? 1
, � +r �« .'• ����} � � s { `'�✓�'i'� •1��`�'� � 'S" �� � �
� � �'�S' '{ �`�> �`' ;, ; #
..
' y '" ''� +rs �
'h s�
� ,�} '��y, � q . �. .
� � �'� ���*��r��` y � r0 �*�'����.. . . .. .
. � , .
i' o� ...,� � � � � �
f � � \ � � � , ,� .
1 •' -�;w € 4' �� � ��� .�'z. Y : �` �,., , ? ��� , ..
f- i _�K., t � � �.
�' Fxro +�
Y�.y ? } f �. ` '��la ���S�Y �� � � YF ..
�,+p {r� ' k � 5 ,r ��, i i�;n �,r H��� �,'�"J`r� e.. ,
��,���d�'h` � t�� , � ,� 'k:, S '�„�a . '
; i���x s�� Y.. � : -'i.. - ,�.. ti �'%'�� �t,.� .... �
�k7� � �` ��'`. t -.. l�. x `� ^�\ �' .�� �i.. .
.fi' a �!'�, "�:' � �i,R'4.� ♦ r�yi t�� � ts :, .� J '°r p
��°' ?�� ' �:, ��"� �.: � �{ �`f -
� ''� � � .��., �� �� ��- �-�� �
'; ����� � `�. � � � �
.
4 � � �, .y� \" y�kM�"1-� {.�
�� .., .J ��� . a
i ' � �'
y � ; " i'�` �i.�,�. g'_.� �
F �i�.« . . � . 3_ ' l ..I�i'� xx'a� _.d.°. . .� .
� �
\ W I
� N �jnN �
Nr���i�
D]�O �� mM I
\ N /- Y �n
�`X�rlog
\ \\go���m �
\ \ �
�
\\
\
/r
� W,
z �� ��;1
� m � V O
p a Z aR
U i � I t=/1�
Q �� Q� I 3
��
J � � I �� �
> � I �o
� I Z
N X
o�
` / a
�� / � ;n � m . 3
\ �/ F N u1 00�
W "n°���a
—__� 3 � � � � � �
� _v�i� d p�� YuMi
. � .� . . . . � ro �a Il�io li
\ �N Q�CQ2'K
�oar-Um
� ^
� ;
s ' �
0
j o =
}_�
o�a
3 �
�
�
/� �I �—�l an.a.� ,.V.,
���-�—�' x
a
�
�
�m
q
%�
� \ — :/ . � , \ ' • ' ' ' ' . . • N b � � s�
\��` \ ' \ . . . . I�NN��T W .
°z�� \ \.. . . . �� M nN N1O \,
� '� � u pwF Min Qrn
\ \ . \. ' ' . . � . %\ �a A �to tl in1D / \
\ d' o�'vz6c� in / Wi
� ,p aoa��im / ,Mp'M R�� /
\ \. �OpO �5� �� I
� \. . . ' FpRESj / . \
z �
\ ° � � � �
I N
\ 5 q �
\ \ i N \\`\ � � . .�b�3 . ON^��i�o� � 1
\ mQ� �, '�i�d> NYp�10N� N .
I V 2 �O ' n m 1
� �K< \\� � . ' �e-' . n ^ „ r, �
•� U > �. .�.c�..o y A 1- N In Z .
Qw : . �a„��tl O
\ � � � \ . � � ~U20t9 F ..
\ � . H � y , . � . � . LL' O �!a-�m Fa- � � I
Z Z
\ �) . � <\ , ' � ' . � � � m ?
� J/ .� ' � . � d � I
m°i � � �'� �� �3 �" .
\ d
�
o � O � � � I
I �,�, � � 'm 3
I \ i�! nN � '
O \ ` \ ", � I I
�1 � � I �� � a�� � . s 3 � ��
Q � � a� ��� • � gM w I
� Y! I � �`' zW �N ��
�,, � � o � g ^ I
� � �� � �s ^ � <�� �
at a� �t —J 3 .
� — - � --�-- W - -- - -
� �� , �y �� -' . � --
O � �i� � =C�- -�—�— . . _. .— — — ' I�
� i \ � �,�
Q �� — �
w � I � � � 3�� �� ' `.
� �\ �. �N���� m
\ � W� S�,o ` � � � �
Z � N � �b � � oQ� e�so�� . ; o � �
�
,,,,� h•�� � �� � \ � '� � aff b���� bq� \ ', '•
�"' � � � , � � J �! Np�'y `. . `. I '.
� � w \ \ \ � ��S \, ' \ , J \
�^�i W \ � � �
�l O \ .'ii: ..� \ �_..�.. � ' .N � 4 � �x��� Bl g �
� � \ j. '�.. et�` �1—.._� . : �r � :
� � .. @ll w�w rw�awe aw 9 15 �: I.
� � ?� \ �--�� ` —� ,–
�� �
W
�
d
.r
�
�
�
^v
g N N
N �
� ,�i� a
qO
� �
a � �
�
� �^
t�
� � �
0
� `
`� ;
� I
I
�
�
W �' \ _. _ ._.. 3 � � g
aw � � o � � �; � � ����
� � \ � � ' �a I : ��a � �
n
Z N I °wa u
� \ �\ o g W� ¢ �
O f/) (,� � • X 2 p p �
� 2 \ "Z � N I �W' =�y�
W� Z �
Q � \ &s �� �� � \ � � � �� � W �
� \ am �` // ��' : w� °°� m o
� \ y� \ Wt� � ` �'��� �� <� ° �m ` �
O 'y� � $'as > ��� � � �.�� 1. �3 i? a `_-'
i ��o� 5> F
��j � y ��o� ��€ �� .� �' \ �° � �
r� v� � \�', / b\ � � g� � $
\ � /� ��4�ew1 �\ . Q . � . � \ z a �n
O Y \ \ � e����^�1 . O . w
�� � tn� � 3 \ ` tl° � '/ . � �' , � � \
Kr'2 �� \ _�
\ � �a �\ N 6 � �� \ �
\ w p�
�
��o° oZ 2� $ • <�
Ul�/! ir� ^� � I
� \\ "� ` ��
\ \ \ i �° ��� . \\.
\ ,�oo \ �O � / � � � � \'.
\ \ / �h � y.�. � o��
. \ /� . �F ` �N� i \
p. o. o \ . . .Y� ' � '�o pZ � � \ \
. ���nMa ,Q . � J� �
�I'1 O �1 N � � \ � � � � \
�a � d•p�f- i2 \ ` ' Z� ' . N W � 11
u� �g � �� M �°� ° � � .
��� �� � �o��i.TSm � \ ' � , � �' . \
a I
��� �� � \ . .r , � ' .
a � `. N
� � . I
o y 1
�o .
��3� i .
�� � ° � � �
�� � I � l
�� �� � � ��' \�
�; �53 �� a � .
� �� �� s � ;�
,�
�LLJ dd �� � �� � �
'ku'¢� ou d �$ \ �
¢�u� `d'� z� � �Rt � � `rm \ �
c� µ a M � V •
LL �
�S� y��np aa O N .v°�� � -� �>,
J µ �
ab� �g � �� � \ Z d:i� �n
�,g���` oo ��d � �� �YS � c ���..-�
�d��= ywW §ii �� �� Wa Q1N aa�
N �"' dx� 88 ad a� ��° ��L
j W�N W2Z �22 � �� S� ��-. i�.
0 oc�`��o d�S�S }�5�5 9� 99 ��
� ���C g�d�d g�d�d �o m� � e� :;. : •" ..
'a ��'.�.. ..
\
�& � y , \ �
� 0
...:��:i�: � �
��° �.a
��� � �
P' °i
� � _ \ g
� �
\ � ��
i� %� p }n
\ \ Q �
\ ��
Z � �4
�� � � �:� +
n N j \ �
� \ � �� a \ �
� � � � �
g � � � �£ o ��
� ` � \\N _�� o�� �
� o�o
� � y �\�� ��om
N . \. �
� I h �\
P
� �. �°\ ��g�p�
` �
� ���.. M. 'F � II O� A D N
� Q m N: '=�1 A� Ny(I�I ��np N
? � r 1� \ ' Z �. f < nN JNN
�j ♦
ti . -' " j \' \ 'L/ iy � A J V (NJ1� � �
�� N. �y ��� �o
�c °c $$'g ��S-" �$$$ �
66 6 ��< �$ ��P� �
� 22� ZZy N� y
Z m
DD �D ggv �N� i�� �
g� � ��� �$ ���� ..
g�Q���
�F' � y^ o u
'�� � g� �� ����
� y '09 99 �
�� � �� �P ����
�� X � � N' `/rDm
1 I Cl y
$ � � � � �,
g �� ��
� �N
�r�
g � F+
0
� o �
z
ii v_� ;;�
� �_ �o�
� �� �
�
�
^'�ZO m, .c � I t .o
� 9 � -1 ,E . \' 3� . \ � '� +' � \Rt . � g
�b
\1
� � S A � '�g. \\ � ° ' o. 1 �
, - � a�, �
� Z �fi ��`: � \\
. \ � � �� T��� \
..0 � �p. -� ' 'fq��`, � V�j �� \
� \ °� � \ � 5= 'AO . �n �'`. Z D ,
L� \Q°
�
��
��
�g
N °'
�
��
u�
�u
��
��
��
�o �
9 Q 1�
��
� �
_
� r�i c' s . �. �. • .: � 0 l, `1 �
\ �� q . .� . & � ���.:...Nf*1 ♦ \ I
�>R qfn. ��'1(�...� \ \ a� '`
C � 1 p 12�1 \
C A . \ �'�.�% \ f�i ��
\ � � � � /^po � \ \ �� \ �
l O e� ss '9
4 �' ' �b �� • \ �
\ � � � � ��� �> �
'� . � � ° _ ��� o�� ' � �, \ �
H �. b
4�, �� .��,� . � � � ��� D ;� a� y� \ �7
�m : I `��'"1. i � �o � �v"s W� + � �� � 9/- �
"' �o � / �� co � �
o \ h�
�m � ; � � � 6� s �� � �.
�� � I� � � ;. \►" ` _� �Z + ���� � = o r
� � v
\ �k \ 1 1
� � �� ��� � � \ . � � \ r + a ��°`��-� �� 9g 0
�� ,` I�� g� ��� J o� $ � � � / � ° °e ■ Ii $R \ � — \ �
� � g % Jb � l'J
S�� �! � ,• � _____________ �
�q � . .. �� aa � �
� _ a a°a°<a a , `�—____ ---- � r
� a � a a° �a / � � tTJ
a, a a ° �- 91i 8 a v ° a a �--�
� �a a�° 41r. rm�rwsmEam��� C'8a°'a° �aa � �� � �
� � �.. � � � Z
� i � �t�— " � u \ a9 ' � �g \
I • �'aa�a°a°a< °°0a � ' � � � S x� \ � �
•I a
� �
1'I ` � '/ / � 8010� '\ . �� I •. \\ _� \ � �
J � �
1 �'r r
o,y �
< �F o
r�os1. \ v� \� ��• i� ('��e RTq �� � — �'� r '� � �� r'�'
` ��� i , pq y� ��,b• �� r �� � �
� a= 1 � \
�'� �. N � ��� �� � _� �'�° Leo � ��o �� � 40 � a r z
� � m �s � ' ` /� N �N� �4 \ ,. \\ p �M
� \ l'J
�
\ �. � . ��. .\ . � � �� _ �m� q�_a. \ � I � O
� k � � �a� � `�7
1 . • \ � - g.> C� � � i� �,
� o ��. �� ti� � N� ~ C�
+�a ' -_/I::o, -- � � — ��� =\ -- —�� � �
`\\ � .:/.1 �..� . � ��A ; � \ Vp � O
� m� m
N
� mg N � �� <P� �� �- I I � �d
�•o�Ol:��a0��q��" . I Jw � . ' �
> \
e : � � y � � � � � $ w• � � g � \ �: 1 � � '�D
gq� ���� �a� ��{ r � �' I �
`��� R F��g 4 � � � I � 4N �\ � ��� . _ � � O
�m���� � � �� � � , � Nw .� \\ \ � �
� � o � ';o. � , � i
� � m � S� Z ' J
� � � � m r� . \ & � � \\ . � .. . \ p�� \
� n �r \ � \ �J v � �o��
ti
� � P � O ^ , \
� '� � DJ '���` . . • �.� �� ... .. ' Q . .�� I\
\
� � �
� i
O �
� � �
v
� g 4
� �
N � ,b
O �
q c�„ \
N �
ti � v
�
Z
� '� D A�y�o� . - t \ . D . \ �- \
� � ��Pg � �
,
' Z N v C� 1 s � ���� • . � m�
D \
tnAti�ll� •oi��n8� \ >��.�
a m�A?Ni�rn z�� ..� �� �
m m
a �D�m �R \
� � � m A � N W �' �� \ . S e � }'� � � � \ .. .. � � �
� N \
� F"m e� ��ti� �� �� o � �
/ W \ 5 � �
\a / �j / � � � � �
\/ �. ' \ \
; Qd 53ao�
�a � � osl °a 1 �' � �' • . a
° / lM0'aH1�� � � N c�i�z�Pa °`' � \ �
, / �<n u O�i 1 aN \`� ..: � �� \ �
m`� �aYmA II � �.' \ I. a
r � \
'`a m -'�NNbtO �;� �� \.. .. � ' �:\
a m�� N� \ • �
f O W �` P
0 � D O A � � � � � � \ �
cAi�i�Po N �
N O� N D C p1 \ � ' \.\ .
� W � \
N p~' p 4 N� � `�� . o°`� • \
e �NIIJN J �• � � `6� �.
a �J�mN� N \ \ �
(�] v p � ui � --1
l
� 6
� f � O r� � \
�' Q x /] �� � � � \
� �
�� n -�� � .1 f�+0 I I � 5
g � � D N � i � '
av g� "g�N Zo < � \ �
�� m A I o� I � N ��o��Pg � � �
�° C � n o �> c i \
c•.°•N v I�OZ ��D I Ayopp �
� N z n � N w� � ",�1���
v Z �m � � Z ��y�Nmo ��\ \
A D I '� �° I NN�p N v
' �� � G Z I m �O O
� �
� � 1 '' � I
� N
�� '
1 � ` }
C�
�
�
Preliminary Plan Request
to Facilitate the
Redevelopment of
West lionshead
Applicant: Vail Resorts
Submitted on March 26, 2007
REVISED September 17, 2007
Attachment C
Submitted by:
� 1�1 � �ri
Msuriello Ptanning Group
r
. _
�
�
�
Table of Contents
Tableof Contents ............................................................................... 2
Directory............................................................................................... 3
Introduction of the Request .............................................................. 4
Review Criteria for a Preliminary Plan for Subdivision ................... 6
AdjacentAddresses ......................................................................... 16
2
Directory
�
Thomas Miller
Project Manager
Vail Resorts Development Company
137 Benchmark Road
Avon, CO 81620
(o) 970-754-2544
(f) 970-754-2555
Tmillerl @vailresorts.com
Mauriello Planning Group
PO Box 1 127
Avon, CO 81620
970.748.0920 (ph)
970.748.0377 (f)
Dominic@mpgvail.com
Sam Ecker
Gore Range Surveying, LLC
PO Box 15
� 5129 Longsun Lane
Avon, CO �1620
(970) 479-8h98
(970) 479-0055 (fax)
sam@gorerange.net
CALLISON
1420 Fifth Avenue #2400
Seattle, WA 98101-2343
Ph. (206) 623 4646
F. (206) 623 4625
Alpine Engineering, Inc.
P.O. Box 97
Edwards, CO 81632
Ph. (970} 926-3373
F. (970) 926-3390
�
3
Introduct�on of the Request
�
We are submitting a request for a preliminary review of a major subdivision
to facilitate the redeve�o�ment of West Lionshead, into a mixed �se hub
with the new name of Ever Vail to create new development parcels and
relocating S. Frontage Road. The major subdivision wiil include a
substantial portion of the West Lionshead area, including the sites of the
Vail Professional Building, Cascade Crossing, the Vail BP, and the Holy
Cross lot, along with the Frontage Road right-of-way. Some of these
properties are currently unplatted. We will be proposing a new
subdivision, titled Ever Vail Subdivision.
The site is currently occupied by Vail Mountain's vehicle m�intenance
shop yard and warehouse, a retail and office complex and a gas station.
The new resort viltage plans call for approximately150-250 whole
ownership condominium units, approximately 75-125 fractional ownership
condomini�m units, an approximately 100,000-square-foot-room hotel,
100,000-150,000 square feet of commercial retail, office, and restaurant
space and an approximately 100,000-square-foot m�un�ain operations
facility. The project will also include a gondola to serve as the fifth base
portal to Vail Mo�ntain, and a new public parking structure.
� It is imporTant to consider this as one of the first steps for the overall
redevelopment of the Ever Vail area. Ever Vail is envisioned to become a
mixed-use hub, incfuding office, retail, and housing. The area will include
employee housing to serve the new uses in the area. The Fronfiage Road
will be re-aligned, locating the road adjacent to I-70, as it is in many parts
of Town. Ever Vail will become more of a village, like Vail Village or
Lionshead, and not be bisected by a major vehicular thoroughfare. We
are working closely with CDOT in this process, and CDOT is supportive of
the road realignment.
�
�
�
r�� : .
_- �
�
•
�
�' � - x���`� �"`�.
. . - _.;- _- �
.����� �'��
�- �� � �I" � ;�.
_ �:' �}'x= t ,
���-�'�#� . £ .��l�l� .
���� :� 'Y�� �.`i R� }. �l�
�. K N
� �� ���i '
i . yll,� _ _ = �• s �{ . 'l *'t,��
i �-�t �'� _ - � �
_ ,�;� �� , r1
;����.` -"�:;:�::.
-a
�.
�� �
�
- . r ...�-i�''��r°:
��
�J
� Review Criteria for a Preliminary Plan for Subdivision
1. The extent to which the proposed subdivision is consistent with all the
applicable elements of the adopted goals, objectives and policies
outlined in the Vail comprehensive plan and is compatible with the
development objectives of the town; and
Our Analysis:
To be the Premier Mountain Resort Community...
We share this vision with the Town of Vail. It is our intent to further this
vision through Phe a�dition of world-class facilities in West Lionshead, in
a new mixed use village, called Ever Vail. This subdivision will enable
the redevelopment of Ever Vail.
This vision is further supported by stated development objectives of the
Town of Vail. The purpose statement of the Lionshead Mixed Use-2
Zone District states:
� The Lionshead mixed use 2 districf is intended fo provide sites for a
mixture of multiple-family dwellings, lodges, hotels, fractional fee
clubs, timeshares, lodge dwelling units, restauranfs, offices, skier
services, light indusfrial activities, and commercial esfablishmenfs
in a clustered, unified development. Lionshead mixed use 2 district,
in accordance with the Lionshead redevelopment master plan, is
intended to ensure adequate light, air, open space and other
amenities appropriate to rhe permitted types of buildings and uses
and to maintain the desirable qualities of the zone district by
establishing appropriate site development standards. This zone
district is meant to encourage and provide incentives for
redevelopment in accordance with the Lionshead redevelopment
master plan.
This zone district was specifically developed to provide incentives
for properfies to redevelop. The ultimate goal of these incentives is
to create an economicafly vibrant lodging, hovsing, and
commercial core area. The incentives in this zone districf include
increases in alfowable gross residential floor area, building height,
and density over the previously established zoning in the Lionshead
redevelopment master plan study area. 7he primary goal of the
incentives is to create economic conditions favorable to inducing
prrvate redevelopment cor�istent with the Lionshead
� redevelopment master plan. Additionally, the rncentives are
created to help finance public, off site, improvements adjacent to
0
redevelopment projects. Public amenities which wrll be evaluated
�` with redevelopment proposals taking advantage of the incentives
`" created herein may include: streetscape improvements,
pedestrian/bicyc{e access, public plaza redevelopment, public arf,
roadway improvements, and similar improvements.
The Lionshead Redevelopment Master Plan provides the framework for
the Town of Vail to review this major subdivision application to facilitate
the redevelopment of West Lionshead. The Lionshead Redevelopment
Master Plan, originally adopted in December of 1998, describes the
Town's intent in the adoption of the Master Plan:
Renewal and Redevelopment
Lronshead can and should be rene�ved and redeveloped to
become a warmer, more vibrant environment for guests and
residents. Lionshead needs an appealing and coherent
identity, a sense of place, a personality, a purpose, and an
improved aesthetic character.
Vitality and Amenities
We must seize the opportunity to enhance gvest experience
and community interaction through expanded and
� additional activifies and amenities such as performing arts
venues, conference facilities, ice rinks, streetscape, parks and
other recreational improvements.
Improved Infrasfructure
The infrastructure of Lionshead (streets, walkways,
transporfation systems, parking, utilities, loading and delivery
systems, snow removal and storage capacityf and its public
and private services must be upgraded to support
redevelopment and revitalization efforfs and to meet the
service expectations of our guests and residents.
Recent amendments to the Lionshead Master Plan, provide additional
direction regarding the West Lionshead Area and more specifically
deal with the possibility of an additional portal onto the ski mountain:
With their recent acquisition of additional properties in this area,
Vail Resorfs has the opporfunity to bring lift service to this part of
Lionshead. Lift service brings wifh it greaf potential for the re-
development of this area and in doing so expand all of Lionshead
to the west with improved pedestrian connections, new retail and
� office activity and other improvements. While lift access will
7
certoinly energize this area during the winter months, attention
� should be given to creating a year-round attraction within this area
of Lionshead (see detailed plan recommendations in Chapter 5).
The master plan recommends that this hub become a residential/
mixed use area with an emphasis on meeting the needs of both
the local community and our guests. Appropriate uses could
include high density residenfial development, lodging, community
and visitor based office and retail space, employee housing and
parking, bus or transit functions and a ski liff connection fo Vai1
Mountain. The catalyst for this mixed use hub is ski liff access to
Vail Mountoin. Considerafion should be given to integrating
employee housing into the redevelopment of West Lionshead in
accordance with th� Town's �mployee hovsing policies ond
regulations. To the extent possible development patferns in this
area should reflect north-south orienfation of buildings, visual
penefrations to the mounfain, and a pedestrian oriented
environment. The degree of north-soufh building orientation may
be difficult given the relatively narrow east-west orientation of this
area. In addition, the introduction of ski liff access in this location
creates a catalyst for a sfructured pubiic parking facilify. All service
and �efivery derr�ands created by development in this area sha11
be accommodated on-sife.
� South Fronfage Road
Recommendations outlined below address potential re-alignment
of portions of the frontage road, ingress and egress improvements,
bicycle/ pedestrian improvements, and visual improvements. For a
detailed discussion of capacity and the impacts of future
development on the frontage road, see the traffic impact study
contained in appendix A. Figure 4-9 depicts potential
redevelopment without the realignment of the Frontage Road
while Figure 4-9a depicts redevelopment with a partial realignment
of the Frontage Road.
�
Potential Realignment
The concept of realigning the South Frontage Road at the
western end of the study area grew out of public discussions
about land development and traffic flow in West Lionshead.
Relative to traffic flow, realignment will remove the conflict
that now exists between through-traffic and mountain
service vehicles (snow-cats and snowmobilesj enfering and
exiting the Vail Associates service yard. Realignment will
position the road to the norfh of most new development,
thus reducing the potential for conflicting turning
movements.
:
� Regarding future land use, the realignment of �outh Fronta�e
Road will allow the west day lot ond the service yard fo be
combined into a contiguous development parcel. 7his is an
important consideration for the developmenf conceptually
depicted in figure 4-9a, and it would be necessory if the
service yard property is used for a secondary public parking
facility or other uses. Any exisfing parking on the West Day
Lof must be replaced within the Lionshead sfudy area.
Through the Transportation Master Plan updafe if is
anficipated that a significanf traffic control device will need
to be installed in the Wesf Lionshead area. Such a device
may include a round about.
�
Specific co��siderations regarding realignment are.
a. Proposed Alignment
The proposed realignment of the South Frontage Road is
depicted in figure 4-9a. Critical design issues include the
width of the road and the radrus of the curves. Both of these
factors will be important in reducing the speed of vehicles
enfiering the Lionshead area and the amount of land
consumed by the two curved road sections. Cooperation
between property owners, developers, the Town of Vail, and
the Colorado Deparfment of Transporfation will be
necessary to implement the realignment of the Frontage
Road.
b. West Lionshead Circle Connection
It is proposed that West Lionshead Circle connect back to
the frontage road at the west side of the Vail Spa. The
alignment depicted in figure 4-9a terminates perpendicular
to the frontage road and does not require the acquisition of
private properfy. A new parcel of developable land,
suitable for offices or non-resorf retail, would be created on
the soutneast corner of this intersection.
c. Forest Road Connection
Forest Road could be realigned to cross through the newly
created development parcel, providing access to that site
and connecting at right angles to the frontage road.
Another alternative that shoufd be considered is to connect
Forest Road to West Lionshead Circle via the existing
Frontage Road right-of-way.
d. 7ransifi and Emergency Vehicle Corridor
� A transit and emergency vehicle corridor should remain in
the existing alignment of the frontage road. This connection
�
is necessary to provide a through-transit roufe to the west
� end of Lionshead and also keeps in place the existing utility
corridor.
��
e. Feasibility of Realignment
The ability to realrgn the frontage road will be heavily
influenced by costs, CDOT (Colorado Deparfment of
Transporfation), and the Federal highway administration.
Future west Lionshead developments will require significant
upgrades and widening of South Frontage Road, potentially
including the widening or reconstruction of the bridge over
Red Sandstone Creek. The cost of realigning the frontage
road is in addition to the mandatory costs of improving the
road.
f. Future Frontage Road Re-alignment
The opportunity may exist to re-locate the Frontage Road the
fvll length of the West Lionshead planning area. The bene�t
of this alternafive would be to eliminafe the "Fronfage Road
bcrrrier" between fhe Holy Cross site and fhe Vail Professional
Building. While this alternative would require coordination
with other surrounding ►and owners, it could warrant further
study and evaluation in the fufure.
The preliminary plat approval of this major subdivision allows Vail
Resorts to move forward in the development of the Ever Vail into the
mixed-hub desired by the Town of Vail and described by the
Lionshead Redevelopment Master Plan. We envision this as step one in
working with the Town of Vail to further its development objectives in
West Lionshead.
2. The extent to which the proposed subdivision complies with all of the
standards of this title, as well as, but not limited to, title 12, "Zoning
Regulations", of this code, and other pertinent regulotions that the
planning and environmental commission deems applicable; and
Our Analysis:
The proposed subdivision complies with all of the Town's codes. Each
parcel created by this subdivision meets the minimum lot area
requirements of 10,000 sq. ft. This plat is being submitted in conjunction
with a rezoning request so that the entirety of Parcels 1 and 2 will be
zoned Lionshead Mixed Use-2.
�
10
Parcel 1:
� Parcel 1 is the eastern portion of the Ever Vail site, encompassing the
parcels currently platted as Tracts A and B, South FronTage Road
Subdivision (which is to be vacated by the propcsed Ever Vail plat). It
also encompasses the current portion of the Frontage Road right-of-
way along this portion. It is 7.585 acres (330,403 sq. ft.). Approximately
7.7% of Parcel 1 consists of slopes in excess of 40% (25,374 sq. ft.) and
15,182 sq. ft. are with in the floodplain. Subtracting the total area of
the site with slopes in excess of 40% minus the areas in the floodplain
(excluding the areas which overlap) from the total site area leaves a
6.72 acres or 292,835 sq. ft of buildable area.
Parcel 2:
Parcel 2 is the western portion of the Ever Vail site, just to the West of
Red Sandstone Creek, and is the current location of the Vail
Professional Building and Cascade Crossing (zoned ABD), along with
the portions of the existing Frontage Road along this site. Parcel 2 is
3.585 acres (156,163 sq. ft.} with 7,238 sq. ft. with excess of 40% slopes
and 9,884 sq. ft. in the floodplain. This equates to a total of 3.21 acres
or 139,920 sq. ft. of buildable area.
3. The extent to which the proposed subdivision presents a harmonious,
�,,, convenient, workable relationship among land uses consistent with
municipal development objectives; and
Our Analysis:
Ever Vail provides a unique opportunity for redevelopment. The existing
uses in the area vary from office uses to more industrial uses. The
proximity of the site to both the ski mountain and Gore Creek creates
remarkable opportunities to capitalize on these assets, while providing
uses and services that the Town desires and needs. The relocation of
the S. Frontage Road furthers these opportunities by creating a site that
can fit these uses while minimizing impacts to adjacent properties.
Moving the S. Frontage Road to a location along side I-70 consolidates
these major thoroughfares, thus minimizing the effects of traffic on
nearby properties and provides a more efficient vehicular corridor.
While a subdivision does not typically address land uses, and instead
focuses on the division of property, the uses proposed for Ever Vail
include the following (all sq. ft. and unit covnts are approximate):
� • Total gross developable square feet = 900,000 - 1,000,000
• Total salable square footage = 600,000 - 700,000
11
• Whole awnership condominiums in square footage = 250,000 -
� 350,000 (150-250 units)
• Fractional ownership condominiums in square footage = 150,000
- 250,000 (75-125 units)
• Hotel in square footage = 100,000 - 150,000
• Commercial development square footage = 100,000 - 150,000
• Mountain Operations facilities square footage = 70,000 - 100,000
• Project Components
o Ski Lift
o Public-Private Parking Structure
o Retail Village
o Onsite Employee Housing
4. The extent of the effects on the future development of the surrounding
area; and
Our Analysis:
The proposed subdivision will allow for uses consistent with the zoning
on the property and compatible with the surrounding area. The
subdivision allows for the redevelopment of a Brownfield area that will
�„�, have a positive effect on the surrounding area.
�
5. The extent to which the proposed subdivision is locafed and designed
to avoid creating spatial patterns that cause inefficiencies in the
delivery of public services, or require duplicotion or premature
extension of public facilities, or result in a"leapfrog" pattern of
development; and
Our Analysis:
The major subdivision is necessary to facilitate the redevelopment of
the Ever Vail area. As a result, this subdivision is highly efficient as
public utilities already exist in the site. Because Ever Vail is a
redevelopment project, it does not result in a"leapfrog" pattern of
development. The project is more consistent with in-fill development
patterns. It is taking an existing, underutilized area and redeveloping it
to a better use. The realignment of the S. Frontage Road will allow
vehicular traffic to flow more efficiently through the area.
12
6. The extent to which the utility lines are sized to serve the planned
� ultimat� population of the service area to avoid future land disrupti�n
to upgrade undersized lines; and
Our Analysis:
High capacity utility lines already exist in the area and since this area
was already considered in the master planning of the area, proper
planning of utility capacity was already undertaken.
7. The extent to which the proposed subdivision provides for the growth of
an orderly viable community and serves the best interests of the
community as a whole; and
Our Analysis:
The re-alignment of the S. Frontage Road will allow for development to
occur in a more logical pattern, along with consolidating and
minimizing the impacts of the traffic associated with the S. Frontage
Road and I-70 into one corridor. The alignment of the S. Frontage
Road parallel to I-70 has been successful in other parts of Town and
�,,,. allows for an efficient flow of traffic.
In addition, the properties in the Ever Vail area are a mix of unplatted,
metes and bounds legal descriptions and platted lots. The proposed
subdivision will allow this area to be developed in a more orderly
pattern.
The subdivision is one step in the overafl process to allow for the
redevelopment of the West Lionshead area into Ever Vail. The
subdivision allows for the provision of public parking, a new ski lift ard
mixed-use hub for the Vail community. The applicant believes that this
redevelopment serves the best interest of the community as a whole.
8. The extent to which the proposed subdivision results in adverse or
beneficial impacts on the natural environment, including, but not
limited to, water quality, air quality, noise, vegetation, riparian
corridors, hillsides and other desirable natural features; and
Our Analysis:
� This major subdivision reqvest will not result in adverse impacts on the
natural environment. The site is currently developed with commercial
13
uses and quasi-industrial uses on the site. All development proposals
� on the site will be completed with the utmost concern for the
protection of Tne natural env�ranment in the area, as we consider
natural areas amenities to the guests of Ever Vaii. As future
applications will indicate, we are hoping to improve the riparian
characteristics of Red Sandstone Creek, which borders the property to
the east of the Vail Professional Buiiding. We hope to make the creek
a great asset to the area and to do so, we will ensure that there are no
adverse impacts to the natural environment.
Vail Resorts has made it a priority to create an environmentally
beneficial project in Ever Vail:
• Brownfield Redevelopment. The Amoco site, which Vail Resorts
purchased for inclusion in this redevelopment project, had previous
oii and gas spills. Vail Resorts is in the process of having the soils
rejuvenated in order to develop a LEED cerfified building and ski lift
on that site as part of the development. The development will
encourage the reuse of land by developing a previously developed
site, not forest or open space, reducing the impact of development
on undeveloped land. The project is the environmentally conscious
redevelopment of property on which previous uses have and
�,, currently include: fuel storage and disbursement, a light-industrial
machine shop, light industrial oii refining operations, vehicle and
heavy machinery maintenance and repair, and warehovsing.
• Wetland and Water Body Conservation. The project will conserve
natural hydrology and habitat and preserve biodiversity though
conservation and improvement of onsite wetlands by removing a
culvert and day-lighting Red Sandstone Creek and enhancing its
surrounding wetlands.
• LEED Cerfified Green Buildings - For the LEED Neighborhood
certified buildings requirement, West Lionshead must meet all the
criteria for LEED New Construction standards for at least 50% of the
building in the project. Vail Resorts plans to have all buildings in the
project meet at least certification level. Some specific construction
. products that the Company plans to use to meet the standards are
as foilows:
o Salvaged Products such as: bricks, millwork, framing lumber,
plumbing fixtures, and period hardware.
o Recycled Products such as: Iron-ore slag used to make
mineral wool insulation, fly ash used to make concrete, and
� PVC scrap from pipe manufacture use� to make shingles.
o Certified wood products that carry an FSC stamp.
14
.
o Windows - NFRC-rated unit U-factor of 0.25 or lower. If the
� frame material is non-green, such as PVC (vinyl), the energy
standard is more stringent: U-factor of 0.20 or lower.
o Equipment that conserves energy and manages loads such
as: water heaters, refrigerators, dishwashers, and clothes
washers.
o Products that do not release significant pollutants into the
building such as: zero- and low-VOC paints, caulks, and
adhesives.
o Products with very low emissions, such as: nonformaldehyde
manufactured wood products.
o Products that remove indoor pollutants such as: certain
ventilation products, filters, radon mitigation equipment.
o Froducts that warn occupants of he�lth hazards in the
building such as: carbon monoxide (CO) detectors, lead
paint test kits, and other IAQ test kits.
o Products that improve light quality such as: tubular skylights,
specialized commercial skylights, and fiber-optic daylighting
systems, full-spectrum lighting systems and highly reflective.
ceiling panels.
�
�
15
�,, Adjacent Addresses
210312109003
GLEN LYON OFFICE BUILDING
C/O ANDREW D. NORRIS
1000 S FRONTAGE RD W STE 200
VAIL, CO 81657
210312100005
934 FRONTAGE RD
VAIL CORPORATION
PO BOX 959
AVON, CO 81620-0959
210312100004
1031 FRONTAGE RD
SOHO DEVELOPMENT LLC
950 17TH ST STE 1600
DENVER, CO 80202
210312100002
953 FRONTAGE RD
� SOHO DEVELOPMENT LLC
950 17TH ST STE 1600
DENVER, CO 80202
210312124001
923 FRONTAGE RD W
VAIL CORP
PO BOX 7
VAIL, CO 81658
210312100010
TOWN OF VAIL
C/O FINANCE DEPT
75 S FRONTAGE RD
VAIL, CO 81657
210312109004
SUB:GLEN LYON SUBDIVISION LOT:39-
2
ROBERT J. ROSEN 2005 QPRT
NANCY ROSEN 2005 QPRT
1 127 LAKE AVE
GREENWICH, CT 06831
�
210312109005
9345 FRONTAGE RD
HAGOPIAN 8� PENNINGTON,LLC
C/O BRENTWOOD ASSOC 8� T.M.
PENNINGTON
1 1 150 SANTA MONICA BLVD 1200
LOS ANGELES, CA 90025
210312109002
TOWN OF VAIL
C/O FINANCE DEPT
75 S FRONTAGE RD
VAIL, CO 81657
210107200001
TOWN OF VAIL
C/O FINANCE DEPT
75 S FRONTAGE RD
VAIL, CO 81657
210107216001
846 FOREST RD
EAGLE RIVER WATER 8� SANITATION
DIST
846 FOREST RD
VAIL, CO 81557
210312100005
934 FRONTAGE RD
VAIL CORPORATION
PO BOX 959
AVON, CO 81620-0959
210107213001
862 FRONTAGE RD W
VAIL CORP
PO BOX 7
VAIL, CO 81658
210107216001
846 FOREST RD
EAGLE RIVER WATER 8� SANITATION
DIST
16
846 FOREST RD
� VAIL, CO 8] 557
210107200001
TOWN OF VAIL
C/O FINANCE DEPT
75 S FRONTAGE RD
VAIL, CO 81657
210107211032
826 FOREST RD
VAIL RESORTS DEV
PO BOX 959
AVON, CO 81620
210107211031
816 FOREST RD
VAIL RESORTS DEV
PO BOX 959
AVON, CO 81620
210107211033
798 FOREST RD
� GAPJNETT, KATHRYN
690 ARDSLEY RD
WINNETKA, IL 60093
�
210107211034
796 FOREST RD
GANNETT, KATHRYN
690 ARDSLEY RD
WINNETKA, IL 60093
210107218002
TOWN OF VAIL
75 S FRONTAGE RD W
VAIL, CO 81657
210107218001
TOWN OF VAIL
75 S FRONTAGE RD W
VAIL, CO 81657
210107217004
825 FOREST RD
GORE CREEK PLACE LLC
PO BOX 7
VAIL, CO 81658
210107217002
72Q LIONSHEAD CIR
VAIL CORP
PO BOX 7
VAIL, CO 81658
Condo Parcel Number
210106317011
210106317024
210106317053
210106317055
210106317057
210106317010
210106317028
210106317056
210106317020
210106317039
210106317050
210106317019
210106317031
210106317044
210106317001
210106317022
210106317033
210106317045
210106317051
210106317016
210106317025
210106317048
210106317008
210106317012
210106317041
000710 LIONSHEAD CIR
VAIL SPA CONDOMINIUM ASSOC
710 W LIONSHEAD CIR
VAIL, CO 81657
DANN PETER - Registered Agent
PO BOX 5480
AVON, CO 81620
17
.
�
u
�
Condo Parcel Number
210312104032
210312104031
210312104012
210312104025
210312104039
210312104037
210312104029
210312104044
210312104050
210312104058
210312104009
2?n312104040
2103121G4016
210312104048
210312104064
210312104059
210312104005
210312104062
210312104008
210312104021
210312104054
210312104066
210312104033
210312104004
210312104007
001000 LIONS RIDGE LOOP
VAIL RUN RESORT COMMUNITY
1000 LIONS RIDGE LOOP
VAIL, CO 81657
William I Fleischer - Registered Agent
1000 LIONSRIDGE LOOP
VAIL, CO 81657
CDOT
4201 E. Arkansas Avenue
Denver, CO 80222
:
�WN OF YAII, V
Department of Community Development
75 South Frontage Road
Uail, Colorado 81 G57
970-479-2138
FAX 970-479-2452
www. vailgov. com
June 22, 2007
To whom it may concern,
This letter is being sent per the requirements of the Vail Town Code to inform you of the
submittal of an application for the review and approval of a preliminary plan, by Vail
Resorts Development Company. Vail Town Code, Chapter 13-3, Major Subdivisions,
requires the administrator of the Code to notify certain agencies that may be impacted
by the proposal of a preliminary plan and subsequent major subdivision of land with the
Town of VaiL
Vail Resorts Development Company is proposing a preliminary plan for the resubdivision
� of the area commonly known as "Ever Vail". Ever Vail is comprised of the current Vail
Resorts Maintenance Yard, Vail Professional Building, Cascade Crossing, the former
Amoco/BP gas station site, and a portion of the South Frontage Road West right-of-way.
A significant aspect of this preliminary plan is the relocation of the South Frontage Road
West right-of-way to the north of its current location. The proposed new South Frontage
Road West right-of-way alignment would locate the road adjacent to the existing
interstate right-of-way.
�
A reduction of the proposed preliminary plan is attached to this letter for your review. All
comments and concerns from your agency must be provided to me by July 6, 2007, in
order to be addressed. If no comment is received by July 6, 2007, at 5:00 p.m. it will be
determined that there were no comments or concerns.
Please review these comments and contact me at 970-479-2148 if you have any
questions. You can also reach me by email at wcampbell(c�vailqov.com. Faxes can be
sent to my attention at 970-479-2452.
R g rds,
����
Warren Campbell
Chief of Planning
Town of Vail
Cc: File
Attachments
i�� RECYCLED PAPER
�
�
\ �
� � a3� � �3 �
��.. � i °��� Iq�
I � � ?�� � �R I
� � �
(,pob� \ I '
a
I µ � � � /
als� \
,
\
\
\
\
�
�
�
O
0
4
�
O
�
O
�
0
���
a� �
II ¢ r Q
z� w
� r'i 0
w �,
^t �
� 0. w O
U
�� �
I Q
>
LL
i o
z
0
� r a
op�
��� �_ _z
i' �� lll� .�� Q C 8
. . � �f'� �' a � � 3
�:oBsR o
i \ ��g�^Qg�
� ybt' � i�°e�b$
F% , � \ "'r•; ^ ,
' \ \ \ �I � 8� �Ps�BR �e i � pw.l •
a §o<�b� "•� ,�oNa i �
b� \ \ \ Fo{�'S� 0.�� `/ / / \
� ��� I 5 \ � g �o .
- �����- �
�� ' '@ `� g _ � :. � o
W � i ��� �\ Rp�� �og�dm � c '
�R �. e \�ie P
°^4 � � � <~ � $g ' Y � Y
: �l� �` e�a�an ' �
•/ € pY 3 �
I` YEd � �'�\ „�s.�r �k�a
i � RYe °-. §`u�5v � $
i �\�a� \ � �S.ES �
s I \\� �?� \ � a` � I
i \ ^ �� I
. �
— ---t--- —J-�— --�--
� _e��--�-----�
c .�, —
� � \ a��� �
� 3�
\
o R
.rf, �� \\\ \ \ �= � ����o6'"i \.
� J '�j 0
r°$ aR � \ \ ,�.� 1.b�� \
.e �� \
� �+ � �\ �'S \
e� �
O g' \� i°n��� ._
�\ � � , ...
��' �
i \
�
Y6 \
�1.� \
s �
\
�
6 �
�d �
�� Y .
�
�
�
\
\
i ��—
„� ` _� �.
/ R- „
�✓ �u r� i� N
�� � �g �� \ � 4
� 1 � ii�l �' J � � �
� � ��` �� � a �
� �..p",u� �� c
� : oy
� �
� �
�� � � �
� � LL :/
•Y
Ng \� � �/�� Y/
� � j4*
\\ ///�/ � S
#
� � es �� `� �
�� � � � �� �
� � \ �
�� a
�t �
�$ Y
� �� ;
:,_ _� ;
�:� g: :
Wbz �� og
� �� �� �
Y4 ��
e �e� £WU �6 �
9 j
p "" isi �� I
3 gie ��Y � �F ��
\
, ,
�
�
£R �\
\\
�
�
�:.:;
..,. .` �-.�..�: ;��:.
���������������
��i0�ii�i���i�i
�\ ---
\ \.
, I
\x�
I��
��`1 �°�
�
I
I
\
\
��
i
y� \
� \RE
� \
� S iq \
°m�1�
a^ o�� \
� - 1
� 1
a I
1
\
�
�
�
�
; _ �`�� �;;
� � �o� t . ��
� �a�
\ � ��� Is� : 4
�° I €
� '
\ I �'� I �o �� a a�
� i ' ��I aty� ".3 e
I° 6 U - _{ i
\ � � (;y. � � � c,
Oy����� I � � � � r % �S
� ~���J
` � ��biu / ^e ^aR �' V3
� \tg� l n.:BR_ o
�\4 \ \� � ~� \ \ \ ��3�3�
�'s 1� � " �r.z .
\� \ � ' � \ �h ; p _ = R 3
'( i � °`:�' %� '�m
� �� � 8\ �eg?�s "+� � �o,Haow.i , � w�
� r� �.\ 5�paWl50 / � \ �`�J
� Q�Y \ Fd0.�-/ / .
\�� \� 5 �\ \ ( $�n;gs � � - �• --
i 3- �F'
�� �\ � mog � \ 4 �� sog��m �
��� � ` '
R° y \ ��e �G °�ye 8 _ n Nq a
R= `\� � = C �� ` � o$e�as = � �
� � ,�s :� ��; � r
■ea � C � E � \ �r���e. J��� y r
�� eYR \ � 1\ \ . �Sg�3e 3 pi� � 6
Q ' ��\ - � �� �\ � a I $ � pi��a� �����54
� I � 1 \ " � �_ � ��i�34Fa���s?9
o ; � � � .$� � , � flo "' � •r..a.�.�oao.f
o " � �R �� '" C� Y f� �-
❑. � --- � _ � ��R - �-- " - —
o �- - � - - �
c �- �
� - � �a" � � � ' � �
� � � � e� m� �� � �
z � � ��i� ��. � 4 �,�
Q � Ul �p� - : hya � � �s
a' ~ _w..l s �g \ � �"a � °oy , \ \ � L � F° \
� � �a
� � ° �R � d ' � �� �'` ,;� �� � � "°�
a � � � ` g- �� ' � � �� ( � s � w ��
z�� � �:% — �s, �� �
�w o = \ �� \� � _ �I��
``' ✓ � � � ��.� `� � �
0. w � _� : �w�.
0 2
� � � �
;
> � � �
O �� �� \ \
z � ��i
o���'i '' \
. 1 �„
�'y ��\;
g Y\
S � :S
�
ii 8 �
g 7
�
C! X �
�� � �
�� = a
�� Y �
.� �� � :
.y_ -- g
:#`A dd f €
��6� �� E 3
�
� ss: �na �� �
� ��� �" :� �
} aWj �� ga a
� •..c $Y� : v. c
� � s g � � �E �� �� i �.
9 �
�^ �Ug�1
r� ��.
�•� � a \� \
� � �
�� . �'�e \ .@ \�
� �;G tf � � �Y �
� `' 1 LL Y� Re \
� '/�� � _ ` �
� s� mc"�
�� 0. .�\f ,� \\ m o � � \
� "�' � � ^ o� � �
\ � � 1
\y � \
\ � � ` 1
�e� � \ i
��� .. � � 1
i \
Rp \ $ � \ e �
_ \ \ \� �is \ �
z \ R \\ \\ \
��a \ �
�$ �
2
� Parcel 1 description:
A parcel of land situated in a part of Section 7, Township 5 South, Range 80 West of the
Sixth Principal Meridian, and in a part of Section 12, Township 5 South, Range 81 West
of the Sixth Principal Meridian, Town of Vail, County of Eagle, State of Colorado, said
parcel being more particularly described as follows:
Beginning at the corner of said Sections 7 and 12; thence S00°07'43"E 233.02 feet along
the common line between said Sections to the True Point of Beginning; thence departing
said common line N59°30'29"E 706.62 feet; thence S27°41'08"W 131.18 feet; thence
S21°24'S1"W 294.44 feet; thence S25°27'28"W 22.32 feet; thence 160.04 feet along the
arc of a non-tangent curve to the right, having a radius of 579.25 feet, an interior angle of
15°49'49" and a chord which bears S37°16'S0"W 159.53 feet; thence 82.42 feet along
the arc of a curve to the left, having a radius of 74.91 feet, an interior angle of 63°02'31"
and a chord which bears S14°41'38"W 78.33 feet; thence S16°36'S0"E 42.70 feet;
thence 47.26 feet along the arc of a non-tangent curve to the left, having a radius of 25.00
feet, an interior angle of 108°18'33" and a chord which bears N70°45'46"W 40.53 feet;
thence 92.97 feet along the arc of a non-tangent curve to the right, having a radius of
623.00 feet, an interior angle of 8°33'00" and a chord which bears S59°21'46"W 92.88
feet; thence S70°27'34"W 223.19 feet; thence S00°07'43"E 187.31 feet; thence
S63°12'41"W 24.66 feet; thence S82°52'42"W 18.75 feet; thence S78°47'10"W 49.41
feet; thence S49°42' 15"W 37.84 feet; thence S70°38'44"W 21.53 feet; thence
S65°49'O1"W 20.69 feet; thence S78°54'09"W 66.76 feet; thence N16°31'00"W 22.14
feet; thence NOS°15'23"E 23.89 feet; thence N14°44'28"E 29.06 feet; thence
� N06°30'09"W 21.74 feet; thence N10°50'S7"W 37.07 feet; thence N20°OS'31"W 15.10
feet; thence N00°22'09"W 46.68 feet; thence S73°02'2T'W 49.97 feet; thence
NO1°46'S6"W 106.46 feet; thence N04°37'43"W 170.34 feet; thence N10°44'06"E 39.10
feet; thence N59°30' 18"E 278.13 feet; thence N59°30'29"E 41.58 feet to the True Point
of Beginning, said parcel containing 8.044 acres, more or less.
•
Parcel 2 description:
�, A parcel of land situated in a part of Section 12, Township 5 South, Range 81 West of the
Sixth Principal Meridian, Town of Vail, County of Eagle, State of Colorado, said parcel
being more particularly described as follows:
Beginning at the northeasterly corner of said Section 12; thence S00°07'43"E 233.02 feet
along the easterly boundary of said Section 12; thence S59°30'29"W 41.58 feet; thence
S59°30' 18"W 278.13 feet to the True Point of Beginning; thence S 10°44'06"W 39.10
feet; thence SO4°37'43"E 170.34 feet; thence SO1°46'S6"E 106.46 feet; thence
S73°28'04"W 692.56 feet; thence N16°29'38"W 83.76 feet; thence N53°51'29"E 252.30
feet; thence N58°53' 10"E 246.32 feet; thence N59°28' 16"E 48.97 feet; thence
N59°28' 16"E 274.19 feet to the True Point of Beginning, said parcel containing 3.300
acres, more or less.
r �
LJ
•
u
Comcast
281 Metcalf Road, Unit I I 0
Avon, CO 8 I 620
•
Vail Recreation District
700 South Frontage Road
Vail, CO 8 I 657
�
u
•
Eagle River Water and Sanitation Districf'
846 Forest Road
Vail, GO 8 I 657
USDA Forest Service
White River
National Forest
P.O. Box 948
Glenwood Springs CO 8 I 602
Eagle County flealth Service District
PO Box 990
Edwards, CO 81 632
�
•
Xcel Energy (Public Serv�ce Company of
Golorado)
4 I 4 Nicollet Mall
Minneapolis, MN 5540 I- I 993
11o1y Cross Electric Assoaation
P.O. Box 972
Avon, CO 8 I 620
�
Qwest
P.O. Box 739
Silverthorne, CO 80439
�
Ourston Roundabout Engineering
August 16, 2007
Kent Kriehn
Aipine Engineering, Inc.
Unit A9, Edwards Business Center
Edwards, CO 81632
Dear Kent,
As requested we are providing a revised conceptual roundabout design for the
South Frontage Road and Forest Road intersection as part of the Ever Vail
development. Our conceptual design (attached) is a single lane roundabout with
three legs.
The south and east legs are undivided two lane sections and the west leg is an
undivided five lane section. The additional curb lanes in each direction on the
west leg are not needed for intersection capacity. Therefore, the west leg of the
roundabout can be narrowed to one lane in each direction. We checked the
capacity implications of a single lane roundabout and find it to be acceptable for
future traffic volumes. This is addressed later in the report.
� The west leg lane configuration requires termination of the continuous right turn
lane east of the right in / right out access point. The continuous left turn lane
terminates at the west splitter island which controls the entry angle and speed
reduction. The westbound bike-parking-travel lane fully develops just
downstream of the west exit at the end of the west splitter island.
The south leg of the roundabout is tightly constrained by both right of way and
geometry. The awkward skew angle of the Forest Road requires the roundabout
to move approximately 60 feet to the southwest with potential impacts to Vail Spa
Condominiums. Moving the roundabout does not encroach on the corner
building but limits the side walk and planting space. The preferred location of the
roundabout optimizes the entering angle and speed reduction for the south leg.
The east approach alignment favors the required roundabout geometry. One
lane in each direction with a curbed cross-section allows for expansion or
contraction of the paved shoulder to the east of the east entry. Eighteen-foot
(18ft.) lane widths are proposed to allow for passing of a stalled vehicle or space
for cyclists. We have not indicated bicycle transition treatments to divert cyclists
from the roundabout entry. This low speed design of this roundabout would not
warrant such measures.
The proposed conceptual layout may require extensions of the retaining wall
along South Frontage Road and the guardrail along I-70. Pedestrians and
bicycles are accommodated on three legs; however, pedestrian and bicycle
facilities along the north side of South Frontage Road are not shown to be
� continuous in this concept. This may be reconsidered subject to the grading and
retaining wall requirements. .../2
5325 Wall Street, Suite 2305 Phone: 608-249.4545 www.OURSTON.com
Madison, WI 53718 Fax: 608-249.4402
Alpine Engineering, Inc.
Kent Kriehn
� August 16, 2007
�, Page 2
The roundabout utilizes the following geometric parameters:
• Inscribed Circular Diameter (ICD) — 125 feet
• Circulating Roadway Width — 22 feet
• Truck Apron — 8 feet
The geometric design parameters that affect capacity, namely: half width, entry
width, effective flare, and entry radius all vary by approach and are detailed in
Table 1.
Table 1— Conceptual Design Parameters (ft.)
West Le South Le East Le
Half Width V— ft 20 18 18
Ent Width E— ft 20 20 18
Effective Flare L' — ft N/A 72 N/A
Ent Radius R- ft 96 40 70
The wider entry widths on the south and west leg are necessary to accommodate
the WB-50 design vehicle. Pavement marking of the left side of wide entries will
�"` reduce the effective entry widths to single lanes.
�r
The operations of the proposed roundabout under future projected traffic in 2025
are predicted using RODEL software as attached. Traffic operations in the 2025
PM peak show an average of 12 seconds of delay on the east and west legs and
11.4 seconds of delay overall. The maximum queue length will be on the east
and west legs and will reach eight vehicles, or 200 feet, in queue. The volume to
capacity ratio will be 0.74, providing residual capacity at 2025. The additional
capacity essentially implies that if each approach had 20% more traffic in a
particular hour, such as a special event, the roundabout would operate at LOS
`D' in that hour at 2025.
It is our opinion that the proposed single lane roundabout concept represents the
preferred traffic control given the future traffic flows and the constrained
intersection space.
Regards,
.�%'
v
Mark Lenters, P.E.
President
ml/nl
� Attach.
�
I �
I I
' �
I �
�
�
�
�
� \
II
I
I �
3
�
�
I i
I �
I I
3
i �
� �
�
II �
I� � i
I
Il
I
�
�
U
O
U
LL
O
�
iB� O
w=
� z s
/°
c
�� f
m
m
N
�
�m
m
k - '
� m
�
ii
� � �
�
\ i �x
\
I�� I �
� �
II
I
II 'I
Ij '�
i� li
--�
I!� I
,
___�
�
._
� _
m
u m � .,
W mn
g m -
S
n
B '
N �
N
w v � �
S a' S1
� c�
�Z
o�
�o�'-' �
cnz� �
��� o
�oz�
o�w o
�
�
�
a
z o
(.7 J
�?O
w� .
O m
}
J Q F—
Q�Z
� �O
� � U
W
U W
Z w J
O Z (.�
UQQ
W
� W �
J
j (.7 �
za
��>
w
> �
w o
z
3
O
H
u
AM PM
0 0
0000 0 0000 0
°� �x «� 14 � 1 �x �X «� 14 t� t �,.
� o 0
O 71'I � � O 975 � � O
2 � 635 � 458 534 � 879 � 814 910
Yl ,» r,s 1 65 ro
Q °oi 76 1 r►° °°�o � 96 1 r►°
a 752 684 � y Q 779 � 897 810 � y 870 881 y
� 0 � � �
o�X � ��h � r�% �% 87 1 �1h t N�x
N 144 O 177 Q 95 5 183 O 65 O 71 5
272 1558 t36 1943
�'" S. FRONTAGE ROAD / FOREST ROAD
� Ourston Roundabout Engineering VAIL, CO EXHIBIT: A
LANE CONFIGURATION
P:�200T07 9XX - Ever Vai�Traific�Single Rountla�out Summary Temdate
_ _..__ . .
�. 2r�> _ 9.2ti 4.2s 4.23.. ..... �irni i�i�:i���� ��in YN
. l.' cri) 4kf.0B 1B.0H 4H.NN 1InI ::I.li�.l 1S
� U <nJ 9.25 9.25 9.25 ]VI:!:II1�1:: 1'I It101r i SS 75
Hf1I� cn) 20.NF1 20.Bf1 2B.0N ."I In1 r:0':I ,il�- 15.0L�1 �
� PNI C�i) 20.08 29.80 20.00 I'1.017 1'I�.ItIOU � 15 'lS �
. DI� (n) 90.BB 98.0� 9B.0B 1'1.011 I�VPI ��i.�iii�i�li VEH �
� Gk�U .^>i:l' 0 B 0 I'I,UI! 1'1_!11( ai�i�i„i��in pN .
I,I.�; N(1M1 PCII �,-UI-.H 7�IIHNS (1;� it, 'l.nd..11)�7'L01'�CI.� FI.O{I IilIi10 '..I'fAW TIMI:':
f�13 FRONT �1.BSf 68 689 0�x `1.BBiSO���.0.T5 1.125 B_75';15 95 ?5 '-.
Nli F'OREST �1.85� 95 177 0 1.08 50'0.75 1.125 8.75 15 95 75 i
17f3 FORESI 1.BSI 958 76 8 I1.00 58 0.75 1.125 0.75I15 95 75 i
C/IPqCt7V ue}� 1225 B73 1167 jAS �ySIC � p�
PUE DELPY � 0.13 6_1B 0.89 LOS UNSIC P��
MH% DiI.pV r 0.18 8.19 0.13 '�
RU1� UUI�:UI�. �eli 2 0 1 UEHIC HRS 2.9 '
HIl% pllfUl �I 2 1 1 COS7 43
.w = .... . ,'iri"°__ "r
�� .- 4.zs a.zs �.zs.. .. iini i�iri�.�i� vFi
i,� 4e.ee ie.eH 4a.ee �iini si.i�:� �s
o . a_z!; a_7s n.zs nr::n�.c� rn;ioi� , is 7s
I:nl� 2N.NN 2N.flLi 70.k341 'I In� .�I.i- ]S.k7N
I•III �. 2ki_NN 2N.Nli 2N.MN � I'I!'. �•1� � 7', 7!,
I�'��� �N.NN qH,41k1 9k3.liN � �� ., , Vl�fl
�;I�i,l� : I I F1 N N I�I.�.� I i i�i .,i� � � (1ry
I.I��: Ni�HI� N�:ti iil�ll IIIHN�' : 1- �, �� _, iir�_ _li� I�I.i�k' /:1. 1'I ��l! Hil l ir� I'1 /�l�! I IHI�
i.ft FNONi 1.BS 68 G8q d :1.00 tlS 4i.'7S 1.125 N.75.15 4S 'IS
NB FORESt 1.85� 95 177 B 1.00 85�0.75 1.125 8.75 15 95 75
WB PORES7 I1.05� 458 76 8 I1.0BIBS�B.75 1.125 8.75I15 95 75
- - --L »4 NUCDCL 1tl.Y
CBPNCIiV veh 1028 676 969 LOS SIC B
NUE DEL11Y s 0.23 8.15 0.19 W1S UNSIC B
MH% DELAV 8.35 8.21 8.19
flUL qUEUE �eh 3 1 1 UEHIC NAS 9.7
M(1% qI1F117�: �rl� 4 1 2 '� CO.^,T 71
.�_.. _ _ _ __- '"'..
1. Cn) 9.'lS 9.25 9.25 -... .... .. I lnl 1'l l:luli Yd
I�' (n> 4B.BB IB.BB 90.08 i1M1 ::LIt'1� 1S '�.
� (n> 4.25 4.25 9.25 �' It[SUL15 PERIOD �n��i ]5 75 ��
i�',lil) <n) 20.00 20.08 2B.0B :' IIHL CO^7 �/lu• 15.00 ��.
I'111 Cd> 20.08 20.80 2B.B0 I'I,OII PFRIOD i SS 75 ��.
I�If� (n> 40.00 90.00 48.00 � PI.OI! 7VI'1� �i�:i�Nr]i UEH ��.
���I'.�D SI�:I' 0 0 0 I'I.OtI I'I��N nm/�V�y�'� PM '.
I,li; HRMI�_ 1'CII :VF:11 I'lIRNS (]c�. xit, ln�i..UJ;I'IAF�CL� CLOU HR7�10 I'1.047 7IMf_�.
1-H FRONi 1.05 87 B70 NP ;1.80'..SB��.0.75 1.125 0.75'15 95 75 '
NB PORE57 I1_05� 819 96 B li_8b'SB�B.75 1.125 0.751i5 45 75 I
CHPRCITY �eh 1213 8� 1231 I LOS��LSIG 11
�UI�. D�I.HV s 0.20 8.09 9.20 LOS UNSIC
M!1" PI�:I.f1V � 0,32 0.12 A.31
iil�l qUl_U1� �i11i 3 0 3 VEHIC HAS 6
nfl:i QIII�:UI ��•1� q N 4 COST $
I <i�i� 9.!`., �.%', 4.�!, � �I'! YN
I.' (n� �41_NN lN.N41 4N.NN � ..i I',
(��� 4.!`., 9.1!, 4_L'� ��I �..r�.l� 1'. 'l'�
I<�il� "1.N.N4f lll.kill 7_N.{1N .. ]'�.NLi
I'lll , :?t1.NVt ;.'F1.N11 7N.1111 I: ��I� i � I!� 'l`.
I�I�i �{1.kib 4l1.Nli 4N.NN , ��. �_. � VIII
�;I+.l;I� :�.I I' 41 li N ', I.��� I"� �,1. ..�, � � 1'M
I.I i�� NiiHl I'i_li iil�ll IIiI:N'.. , i � �. . : �. '.i��'� . .i' �� I�I.i.i� �. �. �� .� � ,..:.• I i� I'I.i��.i � i, ��
I�.It PKONI ].F7S 8'1 BlFl B .I.Ukf.NS k7.7S ].1'L`_� 47.75 IS 95 7',
VB PORESI �S.BS� 819 96 B �S.BB�BS�B.75 1.125 8.75�15 45 95
�UE DELNV s 8.60 8.13 B_58 ( WS UNSIC D I
MNx DELIIV ^ 1.18 8.18 1.12
f1UE QUEUE �eh 9 B 9 VEHIC NRS 16.1
M�Y qll�lll' �i�li 17 B 16 COSi 272 '
. . . .. . .. . ... .;..,:, r :. ?,.... .. .
. .. . .. . . . . _ ,.�'�A ,__ . . ..
�
0
�a�
95%ile QUEUE LENGTH
AM PM
W o 0
U
Z
p J
Z W 100' 50' 200' 200'
O �
0
v�i 50' �
AVERAGE 95 % PROBABLE QUEUE LENGTHS AT THE 50 % CONFIDENCE LEVEL FOR EACH LEG BASED ON
THE 2025 TRAFFIC PROJECTIONS AND CONCEPTUAL LANE CONFIGURATION.
V/C RATIO
AM PM
W NA NA
U
Z
p J
Z W 0.61 0.46 0.74 0.74
O ,�
e
� 0.31 0.17
AVERAGE V/C RATIOS AT THE 50% CONFIDENCE LEVEL FOR EACH LEG BASED ON THE 2025 TRAFFIC
PROJECTIONS AND CONCEPTUAL LANE CONFIGURATION.
RESIDUAL CAPACITY
AM PM
w � �
U
2
�W - � - -
LL '
Z W
O �
° o% 0%
u°�
CRITICAL LEG 43% CRITICAL LEG 20%
RESIDUAL CAPACITIES EXPRESSED AS THE PERCENTAGE INCREASE IN TOTAL ENTERING TRAFFIC
BEYOND THE 2025 PROJECTION THAT WOULD RESULT IN A LEG OPERATING AT LOS E AT THE 50 %
CONFIDENCE LEVEL.
� �
� Ourston Roundabout Engineering
9XX - Ever Vail\Tratfic\Single Roundabout
S.FRONTAGE ROAD/FOREST ROAD
VAIL, CO EXHIBIT:
OPERATIONAL ANALYSIS
an sizoo�
�I . . .9_2S 9.25 ..A..l` . .
1.' tii% 4N.09 10.0N 4Fl.BN
U 9.25 9.25 4.'l:
N(II� 2b.bN lN.L14i 2fl.0fi
I'lll �ii� 7.N_NN 2b.k1N 2k1_NN
I�'.�� 9N.NN 4F1_l1N �(1.N{i
�.. . �: N L1 {t
I 11 I'N��N1� I.N!, ' N � GH•1. .. 41. .. .
NH 1'OHttil 1.415 9S ]'l'7 N
lJB FORESi ;1.HS; 9Sd 76 0
. . . . . . I I n I , . � . �/ 4 t
iini �. ., . is
1{I:'.II', � . , . . . �., ;,
�ri m � _� ��,.�u�
I'I,;i � ,.� . ��� .
.. � ,.. .�.., VI�II
. . , . .. ... __ nn
.. 1 ��; '..Fi 41_ 1� 1.'.:'.� tt 1!� •1'� •1'��
1.4:3 SN F3.7S l.l`2S ki.'l� 1'� 4S 7'�
i1-43�,50��,0.75 1.125 0.75�15 95 75
7V ueh 1286 7B9 1123 I LOS SIG C
LPY s 0.59 8.28 B.IT LOS UNSIG C
LI7Y . Y.19 0.31 8_26
EUE ueh 11 1 2 UEHIC HRS 19.1
FUF �r}� 21 2 7 : COST 212
1�.� A.L'.� 1.%!� 9.l'.
I.' 4N.4iN IN.[iH 4L1.NN
V A.LS '1.%S 4.;:!.
Nilli 1k1.47k1 %P.FiN 2k7.Nf1
I'lll .. 1f1.N41 141.1fN 7.41.LtF1
t�lii qf1_fiM 4N.NH 4k1_k1k1
i�,l'.fil �., i 41 N ti
i,!i;Ni�MI I'i'll ii��ll IIII!N' �I ri
'.0 I�HONI l.ki!, tl'1 81U �fi
IB FORESi 1.85. 71 6S H
�8 PORFSi �1_B51 814 96 0
CNPIICIiV �eh 1282 7BB 1229
NUE DELNV 8.61 B_11 8.59
IY�% DELIIV 1.29 8.15 1.17
AUE 9UEUE �el� il B IS
NH% OIII:UL �r.h 21 0 2N
�
I Ifti I�I I',I�.�'�� ����� Yt1
', I!1! ���.I� I 1!�
i'.�"�. �Il�li�. iS 7S
'� I n�':. I , ��I�i- 1 !, .N{1
1�- I i I',��.�I� 1 S 'l`�
�'�,�, �;I'i ��.,i .i�l�, UF:H
I��..i.. I��, ��.. .�i� � � t•M
i��l II �. I-I.��I� ��I. 1 I.���i I.:�i I I i� I'I.i��,) I', ryl.
1.24i '�U N.'IS 1.115 N.7S ]S 4S 'J!,
�1-20158�8_75 1.125 0.75�15 95 75
NVCUCL ,15_Y
�$ $�Ci Ci
LOS UNSIC D
UEHIC HRS 21.9
(:f1ST , 329
�
�
�
LOS (AVE. DELAY - SEC.
AM PM
�J,J n/a (Minutes) n/a (Minutes)
U
Z
� ; a.�s o.os o.2a o.zo
Z W
UJ
0 o.io o.os
0
�
OVERALL = 6�� (sl OVERALL = ++.� /sl
W n/a (Minutes) n/a (Miwtes)
U
Z
W
� ; . 023 . 0.14 . 0.60 . 0.58
UJ
o . 0.15 . 0.13
�
�
J
W
>
w
J
W
U
Z
W
G
LL
2
O
U
0
N
LENGTH
i����l��� [�1�17:I_\■ ��.���
95% PROBABLE QUEUE LENGTH
AM PM
MAX QUEUE
#LANES
RESIDUAL CAPACITY
AM PM
W 0 0
U
Z
� ] - � - -
Z W
UJ
° o 0
�
CRITICAL LEG 43% CRITICAL LEG 20%
FILE NAME: P:�2007\07 9XX - Ever Vail\Traffic\Single Roundabout Summary Template
PLOT DATE: 8/15/2007
�
�
1.0 EXECUTIVE SUMMARY
Vail Resorts currently plans a redevelopment project within the West Lionshead Village area in
Vail, Colorado. The conceptual plan consists of redevelopment of four separate parcels located
west of the West Lionshead Circle intersection along the South Frontage Road. With
redevelopment of these parcels, a realignment of the South Frontage Road is proposed to align
the South Frontage Road adjacent to Interstate 70 (I-70). The frontage road is proposed to have
an 80-foot right-of-way width through this segment adjacent to Interstate 70 (I-70). According
to the Lionshead Village Transportation Plan Update this has been discussed as part of the
Frontage Road planning with preliminary acceptance from CDOT. With realignment of South
Frontage Road, a realigrunent of Forest Road is also proposed where Forest Road will intersect
South Frontage at the approximate west portal intersection of West Lionshead Circle in a
roundabout. With this realignment, due to roadway geometrics, it is proposed that the west
portal of West Lionshead Circle will have a T-intersection with Forest Road approximately 200
feet south of the roundabout.
The entire Ever Vail redevelopment project is anticipated to include approximately 355
residential units, 162,000 square feet of retail, 54,500 square feet of offices, and 90 units of
employee housing. Redevelopment of the four parcels is also anticipated to include a parking
garage; 400 of the parking spaces in the garage will be reserved for public parking for day skier
use. A new gondola is also proposed on the site. To maintain consistency with the Lionshead
Village Transportation Plan Update and plan for other future growth in the area, analysis has
been completed for the 20251ong term horizon.
�,. Kimley-Horn and Associates, lnc.
096094.000/Vail Resorts' Ever Vail Redevelopment
Page 1
�. The purpose of this study is to identify project traffic generation characteristics, to identify
potential project traffic related impacts on the local street system, and to develop mitigation
measures required for identified impacts. The following key intersections have been included
for evaluation in this study:
• South Frontage Road & Forest Road (future alignment),
• West Lionshead Circle (west portal) & Forest Road, and
• All proposed access driveway intersections.
Regional access to the West Lionshead area is provided by I-70. Primary access to the site is
provided by the South Frontage Road. Direct access to the West Creek portion of the site is
proposed from two access driveways along South Frontage Road. The western access driveway
for West Creek will be restricted to right in/right-out movements only and the eastern access
driveway will provide full tuming movements. Direct access to the East Creek portion of the
site is proposed from two access driveways along Forest Road and two access driveways along
South Frontage Road. The two access driveways along Forest Road will provide full turning
movements. Along the Frontage Road, the western access driveway for East Creek will
provide full turning movements and the eastern access driveway will be restricted to right
in/right-out movements only.
The entire development is expected to generate approximately 6,259 daily weekday driveway
trips. Of these, 302 trips are expected to occur during the weekday morning peak hour, while
487 trips are expected during the weekday afternoon peak hour. The retail trip generation was
reduced by 50 percent to take into account those who visit the shops and restaurants who are
already skiing and staying in the West Lionshead Village area to eliminate double counting of
trips. This reduction is consistent with the Lionshead Village Transportation Plan Update.
Distribution of site traffic on the street system was based on the area street system
characteristics, existing traffic patterns, anticipated surrounding development areas, and the
Kimley-Horn and Associates, Inc.
096094.000/Vaii Resorts' Ever Vail Redevelopment
Page 2
�„ proposed access system for the project. This distribution was developed in accordance with the
Lionshead Village Transportation Plan Update. Assignment of the project traffic was based
upon the trip generation described previously and the distributions developed.
Based on the analysis presented in this report, Kimley-Horn believes the proposed Ever Vail
Redevelopment project will be successfully incorporated into the future roadway network. The
proposed project development and expected traffic volumes resulted in the following
recommendations:
• With redevelopment of the proposed project, the South Frontage Road will be realigned
between the west portal intersection of West Lionshead Circle and the western project
boundary where the road will resume its current alignment. In conjunction with this
realignment, Forest Road will be realigned to the approximate location of the current west
portal intersection of West Lionshead Circle with the South Frontage Road at a roundabout.
Due to roadway geometrics, West Lionshead Circle is proposed to terminate in a T-
� intersection with Forest Road approximately 200 feet south of the future roundabout. These
improvements are consistent with the Lionshead Village Transportation Plan Update.
• According to the Lionshead Village Transportation Plan Update, South Frontage Road will
be widened along project frontage to include one through lane in each direction with a
continuous westbound left turn acceleration/deceleration lane. In addition, a continuous
eastbound right turn acceleration/deceleration lane will be provided along the south side of
the South Frontage Road. Along the north side of the realigned South Frontage Road, a bike
lane will be provided that will serve as an overflow parking lane during the winter ski
season.
• All improvements along the realigned South Frontage Road are recommended to be
designed per the CDOT State Highway Access Code for category F-R roadways with a 25
mile per hour speed limit.
� Kimley-Horn and Associates, Inc.
096094.000/Vail Resorts' Ever Vail Redevelopmenf
Page 3
•
• According to the State Access Code, a westbound to southbound left turn lane is warranted
at the intersection of Access C(western East Creek Access) with South Frontage Road based
on traffic volume projections with development of the proposed project. According to the
code, this left turn deceleration lane should provide 100 feet of storage with an additional
7.5 to 1 taper.
• According to the State Access Code, a westbound to southbound left turn lane is warranted
at the intersection of Access D(eastern West Creek Access) with South Frontage Road based
on traffic volume projections with development of the proposed project. According to the
code, this left tum deceleration lane should provide 125 feet of storage with an additional
7.5 to 1 taper.
• According to the State Access Code, an eastbound to southbound right turn lane is
warranted at the intersection of Access D(eastern West Creek Access) with South Frontage
� Road based on projected traffic volumes with development of the project. According to the
Access Code, this right turn lane should provide 100 feet of storage with a 7.5 to 1 taper.
• According to the State Access Code, right turn deceleration lanes are not warranted at the
interseciaons of Access B, C, and D with South Frontage Road based on project traffic
volumes. However, it is understood that the Town of Vail has requested that a continuous
right turn acceleration and deceleration lane be constructed along project frontage for these
accesses.
• It is recommended that the proposed access driveways along South Frontage Road and
Forest Road operate with stop control along the project driveway approaches with STOP
(R1-1) signs placed along these approaches according to guidance provided in the MUTCD.
� Kimley-Horn and Associates, Inc.
096094.000/Vail Resorfs' Ever Vail Redevelopment
Page 4
�, • All on-site and off-site signulg and striping improvements should be incorporated into the
Civil Drawings, and conform to Town of Vail and CDOT standards, as well as the Manual
on Uniform Traffic Control Devices - 2003 Edition (MUTCD).
u
� Kimley-Horn and Associates, Inc.
096094.000/Vail Resorts' Ever Vail Redevelopment
Page 5
�r
�
LEGENO:
� �
� A
STOP
I �
Study Areo Key Intersection Project
Access Drive
Stop-Controlled Intersection Approoch '
Roundabout
i
..: ��::•::•::•:•�� 2
::: Q: �.
S��R�� .:::�::�:"::;::::::�::::��::�::� :::::::::::::" ��o�
��' :;:�:����'..�.......::�::::' ��
.:::.: :: .................. ..
� :�:;:0�...�...�...�:::.
wser cr�ec �:.�. �: �.:::. , :�.::.::::.�::.
....... ..
.........
..�:::::::��:�::� ::�:::::::�::::. �:::� . ....
: ��:�:::: •: :.::::
� y
Y
�
5. Fronlo e Road
� �
C FULL MOVEMENT
f-
5. Fronto e RoaA �
� � STOP
�
p FVLI MOVEMENT
�—
S. Fronta e Road �
—� � STOP
�
E RIGHT-IN/RIGHT-OUT
��
S. Fronla e Road S. Fronlo e Raad
—�. � STOP
�
FIGURE 2
� EVER VAIL REDEVELOPMENT, VAIL, CO
FUTURE LANES AND CONTROL
���
NORTH
NTS 09609a.000
"1�ii�
,•
B RIGHT-IN/RIGHT-OUT
f—
S. Fronta e Rood
� � STOP
�
�❑ Kimley-Horn
_ ond Associates. Inc.
� ���
N O RTH
NTS 096094.000
�
� 2
� n �- 65(770)
in o
�- 320(730) c' O1
�- 60(50) J, � � 5(5) M�es
S. Fronto e RooA Lionshea
Circl
625(635)� � � � �
55(50)� a � M N
� a �
v
u 9
0 0
4�
LEGEND:
� 1 Study Area Key Intersection
• A Project Access Drive
E— XX (XX) AM(PM) Peok Hour Troffic Volume
FIGURE 3
� EVER VAIL REDEVELOPMENT, VAIL, CO
2025 BACKGROUND TRAFFIC VOLUME PROJECTIONS
�❑ Kimley-Horn
_ ond Associotes, Inc.
�
�
LEGEND:
� 1 Study Area Key Intersection
• A Project Access Drive
� XX�(XX%) Entering(Exiting)
Percentage of Vehicles
��
,
� 552
5. Fronta e Road �
�55x> � � �
�
C
f— 55S
S. Fronto e Rood �
(55x) �i � �
�
�
,��o
..: ��'�"::::::' 2
..... ...........
...... ..........
........ ..........
::: .•.Q ; .
t'�R�� .:::�•'::::.::�.-�.�:.:::•::•::.:�:::: ::: ����
� ::•::�:::::•:::::.�::::::�::.�:.:�:;�;:.�
�� i:�: ••EASTOl�C �:::::::...
.....
..... . ..................
� �:.'.�' ::.::: :': �; ..
.: :: :,.; � WESf CIi�C .::.. •.•:.•:::' :'.•.:.: ::•.:::.:::: ..
: : o;�: :;; : :�:�:: : : : �: :: ::: : :..
z
�
� � � Wes
Lionsheo
TT Circl
I
o°o
�rc
D
�
� SSR
S. Fronto e Rood
(157.) —� � �
(357.) � a °a
E
E-- (4s�
S. Fronlo e Rood
359.� �
109.� �
FIGURE 4
� EVER VAIL REDEVELOPMENT, VAIL, CO
WEST CREEK TRIP DISTRIBUTION
���-- �
NORTH
NTS 09609a.000
d,�G�
B
E— SSx
S. Fronl e Road �
(557� � � �
�
❑ ❑ Kimley–Horn
_ ond Associates, Inc.
�
�
LEGEND:
� 1 Study Area Key Intersection
� A Project Access Drive
� XX%(XX�) Entering(Exiting)
Percentoge of Vehicles
�o
1
� aoz
�- zsz
5. Fronta e Rood
(307.) —� � �
2�% � p N
C
E— (20�)
� 30R
S. Fronlo e Road
zaz � � �
25R'�j vA�i �
N �
�o
D
F— (45R)
S. Fronto e Road �
a59. � � �
�
E
� (45R)
S. Fronto e Road
457. � �
�
FIGURE 5
� EVER VAIL REDEVELOPMENT, VAIL, CO
EAST CREEK TRIP DISTRIBUTION
��
N�RTH
NTS 096094.000
B
� soz(2o�)
S. Front e Rood �
20R(57C) � � �
� N
❑ ❑ Kimley—Horn
_ ond Associates, Inc.
�r
�
LEGEND:
� 1 Study Areo Key Intersection
• A Project Access Drive
� XXi(XX%) Entering(Exitinq)
Percentage of Vehicles
h�o
1
� 55�
S. Fronta e Road �
(55%) � � 1
�
C
� SSR
5. Fronto e Rood �
(559.) —� � �
_�
t �� o
..: �...�s. :�:::�:::�: � z
. �.:Q:::
tP�R�� .:::�c .::� : ��::�::;:�::�:::�::: ;: :::::::: ::::: �'��°e9
��d� ::::.: :::::::�:�::�:�:�:�:�:�::::::::::� :::::::' ��.�
.... ....
...... ......................
Easr c�c �
�.1 '.: EA
WE3f CI�C ::� :•.:t :::•.:::•:.... � ::
................. .
... ......
:. ::.'� :'.'.'.'.".'�•� . : � ;'::.. � . � �.::
2
�
� � � Wes
Lionsheo
T � Circl
u°
0 0
�
D
�
� 559.
5. Fronta e Road
� I �
459. —�j ,� ,�
v v�
E
� (459.)
S. Fronlo e Road
45X � �
�
FIGURE 6
� EVER VAIL REDEVELOPMENT, VAIL, CO
�''' DAY SKIER PARKING TRIP DISTRIBUTION
��
NORTH
NTS 096094.000
aRd'f'
B
� 55S
5. Fronto e Roatl �
(SSR) � � �
�
❑❑ Kimley—Horn
_ and Associates, Inc.
�Irr
�
�
LEGEND:
� 1 Study Areo Key Intersection
� A Project Access Drive
� XX (XX) AM(PM) Peak Hour Troffic Volume
,
F— az(z9)
5. Fronto e Rood �
22(49) � � �
�
C
� az(ze)
S. FrOnto e Road �
22(49) � � �
�
0
..: •ar ::•::•:•r 2
�r:�.Qr �'
�r�f��� .::.LJ.'..�::::::..�;.;•.:•.�.'::.�:.�::.�.�:.�.�A�
��� ::::.�.;�:.�:::.�:. :.::.•:.•:.•.�.,.;;.:.��� t
.. EA'Jf GY�C .'::.:'.'.
� :.�� .� ... ...:.•....•.
WEST Cf�C '.':. '::::.: �:: r.•:..... ::•.
.............. .
... .........
�:: : o; :�: :;;�:� �:�: : : :: :: � :: ::: : :
2
�
� � � Wes
Lionshea
TT Circl
I
u o
`o 0
��
D
�
� a2(ze)
5. Fronto e Road
6(13) � � �
27(19) -1j °a n
� a
E
� ta(aa)
S. Fronta e Rood
27(19) —� �
7(5) � �'
m
FIGURE 7
� EVER VAIL REDEVELOPMENT, VAIL, CO
WEST CREEK TRAFFIC ASSIGNMENT
��
NORTH
NTS 096094.000
.:lli
B
� az(ze)
S. Fronta e Road �
22(49) —� � �
�
❑ ❑ Kimley—Horn
— ond Associates, Inc.
�
�
LEGEND:
� 1 Study Area Key Iniersection
� A Project Access Drive
� XX (XX) AM(PM) Peok Hour Troffic Volume
1
� 19(55)
L� 16(46)
S. Fronta e Road
3J(49) � � �
73(37)� n °a
�
N M
C
E— zs(32)
� 19(55)
S. Fronto e Rood
73(37) � � �
15(45) � v �'
o tO
n
0
l�
..:.Q':•:::.•::� 2
:::�� fl::.
st�'c�� ..:::��::::�:�;::::::�:::�;�'::.:::�:::::�:�����
�� �:�:�:�:�:�:�::� �::�:� ::::::::: ::: :: ��: � � �� �� �
.:::.,� ::::...................
Easr a�c ..
� :'::::��:::':':::'::'
wwr c�c •..: :::.�. � :.:. �:: :::.�::.
.....
................. ..
... .........
:: : :�� :�: :: �: : :� : : : :: : : :: : :: :::: : . .
2
�,
m �
�,
N
� � � Wes
Lionshead
T � Circl
n
�o
N
u°
� o
0 0
�rc
D
E— ss(�s)
S. Fronta e Road �
28(82) -� � �
�
E
E— 55(73)
S. Fronto e Rood
28(82) � �
�
FIGURE 8
� EVER VAIL REDEVELOPMENT, VAIL, CO
EAST CREEK TRAFFIC ASSIGNMENT
��
NORTH
NTS 096094.000
aa�
B
� 44(87)
S. Fronto e Road �
19(46) � � �
-� °a
n
�❑ Kimley-Horn
_ ond Associates, Inc.
�
�
LEGEND:
�
���
NORTH
NTS 096094.000
Study Area Key Intersection
1
�- 77(nominol)
5. Fronta e Road �
nominol(77) � � �
.�
C D
� 77(nominal) �-
�- � 77(nominol)
S. Fronto e Rootl 5. Fronta e Rood
nominul(77) � � � � � �
� 63(nominoi) � � n
0 0
E �E
0 0
c c
E
� nominol(63)
S. Fronta e Rood
63(nominal) -� �
_�
FIGURE 9
� EVER VAIL REDEVELOPMENT, VAIL, CO
DAY SKIER PARKING TRAFFIC ASSIGNMENT
B
� 77(nominol)
S. Front e Road �
nominal(77) � � �
�
❑❑ Kimley-Horn
- and Associates, Inc.
�
�
LEGEND:
� 1 Study Area Key Intersection
� A Project Access Drive
F— XX (XX) AM(PM) Peok Hour Troffic Volume
�
...� •�:::.•:::v. 2
:::�: fl:: �
o� :.:::::� �::�::::�::::::::�::::;�:� �::� �o�
� ..:::�.::�:.::::::�:::� :':�:::::�:::::�
f� ,�pC'� •::•::•.•.:• :..: ::::.: ::::: �:;.:�:::.;:"� �y4
..... ....
............ . . . . .. �
EAST Cfi�C . :::::•.
� .:.�.:�.......:�.:..
N'E8f Cf�: '::. ':.•:.•.•:.• :.:...........
................. ..
.. .........
..�:�:::;;�:o:� ::�:�::�::�:��:�::.:.:�::;:::: ..
,
� a58(8t4)
� 76(96)
5. Fronto e Rood
684(810) -� � �
6B(87) � n v
�n n
�o
C
F— 504(936)
� 19(55)
S. Fronto e Rootl
ns(eae) -� � �
15(45) � < m
o tD
n
D
F— 415(948)
� 179(29)
S. Fronto e RoaC
714(780) � � �
90(19)� o n
m �
E
� 433(1051)
798(786) � �
7(S)'y M
m
FIGURE 10
� EVER VAIL REDEVELOPMENT, VAIL, CO
BACKGROUND PLUS PROJECT TRAFFIC
=�
NORTH
NTS 096094.000
aa�
B
F— Sz�c99,>
5. fronto e Rood
721(857) -� �
naminol � v
n
G a Kimley-Horn
_ and Associates, Inc.
�
�
LEGEND:
•�
� A
STOP
�
`— xxx'
Study Areo Key Intersection Project
Access Drive
Stop—Controlled Intersection Approach �
Roundobout
Turn Lane Length (feet)
0
..: '� '.:::�:: . 2
::•: .�.Q • �
�f��� ..: •.1J:.�.:'�'�;::.:::::;�,.::.:• ...:.::.:::::.:�. p�
E��tr :: ���
::�::Ensrcr�c�'::::::•::•:.:•::: `�
.:::.: :: ..................
� ��::�.........��"�.
wssrc�►c •.:�:��:.:.�.:�::.�.� ::.::::::::::::
..
.................
... ...
::: D :•:.•::.:.•:.�. '.: ......
.. ..
... .. .... ...
.... .
::
�:...Q ...... .... .:.: �:::
1 1
Y}
�
5. Fronta e Rood
� �
c
f—
,00• 5�a�o9
5. Fronlo e Rood �90' taper
—� � STOP
.�
D
f_
i25' slorog
S. fronta e Road �90 �aPer
—� � STOP
.�
" continuous oUelerotion/decelerotion lone
E
�
5. Fronta e Rood
—�. /'' STOP
25' storoge � I
90' toper
- �_ �
NORTH
NTS 09fi094.000
a��
B
f—
S. Fronto e Road
--� � STOP
.-�1
FIGURE 11
� EVER VAIL REDEVELOPMENT, VAIL, CO
FUTURE LANE AND CONTROL RECOMMENDATIONS
❑� Kimley—Horn
_ and Associates, Inc.
�
�
�
�
�
� Eo c�n � u°� ° �' � °�° �° � m �
0
x
�y W e�-+ � e�-+ �� �� N 6� � N
t.
� W N r�-� cmri �� � om0 � N ti N
oa
OE-� cn � d� [� e�r e-Ny ��~ H M
x �,
�� L 1 N� M�� t-N�-� N d� ~ H H
° � v
� Q W .o .� oo � � N c`�n r" �� �
��
�.
C9 Q•
.,.
� F' ° c�v m r�-+ � °°° ,-, a�
0o cn oo �n
,� � Ln �ry � � `--� ('n �D 00 f� N
� � � �
d Q
o.
° � �,� �,} ��; �w
�� .
� b � °" � � � °" �
� � .�
�''` v c'"a o
� C > � g � � � � ° �
� � � � � � � � �
0�J N ,� `'�'� �
D
W v
]
'� ,d
� � N a~0 N n N o~D n
� U
�
.� .�
0 0
v � v x � v
w :� v y :C v
� � � � � �
�GJ aV.. � '� �O y "., (� G1 .*.",�, �O y v.,
V U
i�r ..a '� a+ .� fC i�, ..r � fa
�'-� � W' � W O,�n W '�-,' -N� W O v�i E+
�
r
'�
n �
O
O
N
� O
�
� r
� L
�
� ~
w �
�
.�
� �
� �
0
�
�
w
� �
x
v
v
U
y
3
�
0
�
�
F,
w
v
�
�
0
�
�
A
�0
z
.�
�
�
�
o�i
�
�
�
�
a
.�
0
�
m
�
y
�
�
�
�
�
�■�tr � and Associaces, �nc.
Project Ever Vail Redevelopment
Subjecf Trip Generation for Condominiums on West Creek
Designed by EAG Date July 31, 2007 Job No. 096094000
Checked by Dafe Sheet No. 1 of 1
TRIP GENERATION MANUAL TECHNIQUES
ITE Trip Generation Manual 7th Edition, Average Rate Equations
Land Use Code - Residential Condominium/Townhouse (230)
Independant Variable - Dwelling Units (X)
X = 75
T= Average Vehicle Trip Ends
Peak Hour of Adiacent Street Tra�c. One Hour Between 7 and 9 a.m. (aaqe 368)
Directional Distribution: 17% ent. 83% exit.
T= 0.44 � X T= 33 Average Vehicle Trip Ends
T= 0.44 � 75.0 6 entering 27 exiting
6 + 27 = 33
Peak Hour of Adiacent Street Traffic, One Hour Between 4 and 6 p.m. (pasle 369)
Directional Distribution: 67% ent. 33% exit.
T= 0.52 * X T= 39 Average Vehicle Trip Ends
T= 0.52' 75.0 26 entering 13 exiting
Weekdav (aaae 367)
Daily Weekday
T = 5.86 ' X
T = 5.86 "
26 + 13 = 39
Directional Distribution: 50% entering, 50% exiting
T= 440 Average Vehicle Trip Ends
75.0 220 entering 220 exiting
220 + 220 = 440
�
��ECitr�eyF{�m
ar3d Associat$s, Ine.
Project
Subject
Designed by
Checked by
Ever Vail Redevelopment
Trip Generation for Retail on West Creek
Date July 31, 2007 Job No. 096094000
Date Sheet No. 1 of 1
TRIP GENERATION MANUALTECHNIQUES
ITE Trip Generation ManuaPth Edition, Average Rate Equations
Land Use Code - Specialty Retail Center (814)
Independant Variable - 1000 Sq. Feet Gross Leasable Area (X)
X = 24.000
T= Average Vehicle Trip Ends
Peak Hour of Adiacent Street Traffic, One Hour Between 7 and 9 a.m.
Proportional Difference Between AM and PM rates for Shopping Center (820) were applied to determine rate
Directional Distribution: 61% ent. 39% exit.
(T) = 0.74 (X) T= 18 Average Vehicle Trip Ends
(T) = 0.74' (24.0) 11 entering 7 exiting
11 + 7 = 18
Peak Hour of Adiacent Street Traffic, One Hour Between 4 and 6 p.m. (paqe 1339)
� Directional Distribution: 44% ent. 56% exit.
(T) = 2.71 (X) T= 65 Average Vehicle Trip Ends
(T) = 2.71 " (24.0) 29 entering 36 exiting
29 + 36 = 65
Weekdav (aa�e 13381
Daily Weekday
(T) = 44.32 (X)
(T) = 44.32 ' (24.0}
•
Directional Qistribution: 50% entering, 50% exiting
T= 1064 Average Vehicle Trip Ends
532 entering 532 exiting
532 + 532 = 1064
� � Kimley-Nom
CS� and Associates, Inc.
�
•
Project Ever Vail Redevelopment
Subject Trip Generation for Employee Housing on West Creek
Designed by EAG Date July 31, 2007 Job No. 96094000
Checked by Sheet No. 1 of 1
TRIP GENERATION MANUAL TECHNIQUES
ITE Trip Generation Manual 7th Edition, Average Rate
Land Use Code - Apartment, (220)
Independant Variable - Dwelling Units (X)
X = 80
T= Average Vehicie Trip Ends
Peak Hour of Adiacent Street Traffic. One Hour Between 7 and 9 a.m. (pa�e 307)
Average Weekday Directional Distribution: 20% ent. 80% exit.
T= 0.51 (X) T= 41 Average Vehicle Trip Ends
T= 0.51 ' 80.0 8 entering 33 exiting
8 + 33 = 41
Peak Hour of Adiacent Street Traffic, One Hour Between 4 and 6 a.m. (aa�e 308)
Average Weekday Directional Distribution: 65% ent. 35% exit.
T= 0.62 (X) T= 50 Average Vehicle Trip Ends
T= 0.62' 80.0 33 entering 17 exiting
Weekdav (paqe 306)
Average Weekday
T = 6.72 (X)
T = 6.72 ' 80.0
33 + 17 = 50
Directional Distribution: 50% entering, 50% exiting
T= 538 Average Vehicle Trip Ends
269 entering 269 exiting
269 + 269 = 538
�
�
�
� Kimley-Hom
' � __ ___ and Assoc�ates, Inc.
Project Ever Vail Redevelopment
Subject Trip Generation for Office Building on West Creek
Designed by EAG Date July 31, 2007 Job No. 096094000
Checked by Date Sheet No. 1 of 1
TRIP GENERATION MANUAL TECHNIQUES
ITE Tri� Generation Manual 7th Edition, Average Rates
Land Use Code - General Office Building (710)
Independant Variable - 1000 Square Feet (X)
X = 47.000
T= Average Vehicle Trip Ends
Peak Hour of Adiacent Street Traffic, One Hour Between 7 and 9 a.m. (Pa�e 1159)
Directional Distribution: 88% ent. 12% exit.
(T) = 1.55 (X) T= 73 Average Vehicle Trip Ends
(T) = 1.55 " (47.0) 64 entering 9 exiting
64 + 9 = 73
Peak Hour of Adiacent Street Traffic. One Hour Between 4 and 6 p.m. (paqe 1160)
Directional Distribution_ 17% ent. 83% exit.
(T) = 1.49 (X) T= 70 Average Vehicle Trip Ends
(T) = 1.49 * (47.0) 12 entering 58 exiting
12 + 58 = 70
Weekdav (page 11581
Daily Weekday
(T) = 11.01 (X)
(T) = 11.01 * (47.0)
Directional Distribution: 50% ent. 50% exit.
T= 517 Average Vehicle Trip Ends
259 entering 259 exiting
259 + 258 = 517
�
�
.
� _ \ 8r1d AssoCiSteS, InC.
Project Ever Vail Redevelopment
Subject Trip Generation for Condominiums on East Creek
Designed by EAG Date July 31, 2007 Job No. 096094000
Checked by Dafe Sheet No. 1 of 1
TRIP GENERATION MANUAL TECHNIQUES
ITE Triq Generation Manual 7th Edition, Average Rate Equations
Land Use Code - Residential Condominium/Townhouse (230)
Independant Variable - Dwelling Units (X)
X = 280
T= Average Vehicle Trip Ends
Peak Hour of Adiacent Street Traffic. One Hour Between 7 and 9 a.m. (paae 368)
Directionat Distribution: 17% ent. 83% exit.
T= 0.44 * X T= 123 Average Vehicle Trip Ends
T= 0.44 * 280.0 21 entering 102 exiting
21 + 102 = 123
Peak Hour of Adiacent Street Traffic. One Hour Between 4 and 6 q.m. (aaqe 369)
Directional Distribution: 67% ent. 33% exit.
T= 0.52 * X T= 146 Average Vehicle Trip Ends
T= 0.52 " 280.0 98 entering 48 exiting
Weekdav (paqe 367)
Daily Weekday
T=5.86*X
T = 5.86 "
98 + 48 = 146
Directional Distribution: 50% entering, 50% exiting
T= 1640 Average Vehicle Trip Ends
280.0 820 entering 820 exiting
820 + 820 = 1640
�
; �� Kirrdey-Florn
' ..... er�d Ass�ciates, Ins.
Project Ever Vail Redevelopment
Subjecf Trip Generation for Retail on East Creek
Designed by EAG Date July 31, 2007 Job No. 096094000
Checked by Date Sheet No. 1 of 1
TRIP GENERATION MANUALTECHNIQUES
ITE Trip Generation Manua�th Edition, Average Rate Equations
Land Use Code - Specialty Retail Center (814)
Independant Variable - 1000 Sq. Feet Gross Leasable Area (X)
X = 138.000
T= Average Vehicle Trip Ends
Peak Hour of Adlacent Street Traffic, One Hour Between 7 and 9 a.m.
Proportional Difference Belween AM and PM rates for Shopping Center (820) were applied to determine rate
Directional Distribution: 61% ent. 39% exit.
(T) = 0.74 (X) T= 102 Average Vehicle Trip Ends
(f) = 0.74 * (138.0) 62 entering 40 exiting
62 + 40 = 102
Peak Hour of Adiacent Street Traffic, One Hour Between 4 and 6 p.m. (paqe 1339)
� Directional Distribution: 44% ent. 56% exit.
(f) = 2.71 (X) T= 374 Average Vehicle Trip Ends
(T) = 2.71 ' (138.0) 165 entering 209 exiting
165 + 209 = 374
Weekdav (pa�te 13381
Daily Weekday
(T) = 44.32 (X)
(T) = 44.32 * (138.0)
•
Directional Distribution: 50% entering, 50% exiting
T= 6116 Average Vehicle Trip Ends
3058 entering 3058 exiting
3058 + 3058 = 6116
�,. � Kimley-Hom
C�� and Associates, Inc.
�
•
Project Ever Vail Redevelopment
Subject Trip Generation for Employee Housing on East Creek
Deslgned by EAG Date July 31, 2007 Job No. 96094000
Checked by Sheet No. 1 of 1
TRIP GENERATION MANUAL TECHNIQUES
ITE Trip Generation Manual 7th Edition, Average Rate
Land Use Code - Apartment, (220)
Independant Variable - Dwelling Units (X)
X = 10
T= Average Vehicle Trip Ends
Peak Hour of Adiacent Street Traffic. One Hour Between 7 and 9 a.m. (paqe 3071
Average Weekday Directional Distribution: 20% ent. 80% exit.
T= 0.51 (X) T= 5 Average Vehicle Trip Ends
T= 0.51 ' 10.0 1 entering 4 exiting
� + 4 = 5
Peak Hour of Adiacent Street Tra�c, One Hour Between 4 and 6 a.m. (aa4e 308)
Average Weekday Directional Distribution: 65°/a ent. 35% exit.
T= 0.62 (X) T= 6 Average Vehicle Trip Ends
T= 0.62' 10.0 4 entering 2 exiting
Weekdav (aaqe 3061
Average Weekday
T = 6.72 (X)
T = 6.72 ' 10.0
4 + 2 = 6
Directional Distribution: 50% entering, 50% exiting
T= 68 Average Vehicle Trip Ends
34 entering 34 exiting
34 + 34 = 68
�
�
•
� KimleyHom
� _ _, and Associates, Inc.
Project
Subject
Designed by
Checked by
Ever Vail
Generation for Office Building on East Cree
Date July 31, 2007 Job No. 096094000
Date Sheet No. 1 of 1
TRIP GENERATION MANUAL TECHNIQUES
ITE Trio Generation Manual 7th Edition, Average Rates
Land Use Code - General Office Building (710)
Independant Variable - 1000 Square Feet (X)
X = 7.500
T= Average Vehicle Trip Ends
Peak Hour of Adiacent Street Traffic. One Hour Between 7 and 9 a.m. (Paqe 1159)
Directional Distribution: 88% ent. 12% exit.
(T) = 1.55 (X) T= 12 Average Vehicle Trip Ends
(T) = 1.55 * (7.5) 11 entering 1 exiting
11 + 1 = 12
Peak Hour of Adiacent Street Tra�c. One Hour Between 4 and 6 a.m. (paae 1160)
Direcfional Distribution: 17% ent. 83% exit.
(T) = 1.49 (X) T= 11 Average Vehicle Trip Ends
(T) = 1.49 * (7.5) 2 entering 9 exiting
2 + 9 = 11
Weekdav (aas�e 1158)
Daify Weekday
(T) = 11.01 (X)
(T) = 11.01 *
Directional Distribution: 50°/a ent. 50% exit.
T= 83 Average Vehicle Trip Ends
(7.5) 40 entering 42 exiting
40 + 43 = 83
Movement Summary
Movement Summary
�.
Ever Vail Redevelopment 2025 PM Total
Roundabout
Vehicle Movements
Page 1 of 1
r� �'-'-.. z
�, �-.�� akcelii�
$� �554Ct�t�S
c���t`��1C ��i3��
Deg of Aver 95��0 Aver
Dem Flow Cap Level of Back of Eff. Stop Oper Cost
Mov No Turn Satn Delay S eed
(veh/h) (veh/h) �v/c) (sec) Service Queue Rate p ($/h)
��� (mi/h)
South Approach
32 L 192 670 0.442 12.4 LOS B 94 0.88 20.5 123
32 R 103 670 0.442 12.4 LOS B 94 0.88 20.5 123
Approach 296 670 0.442 24.9 LOS B 94 1.77 20.5 246
East Approach
22 L
22 T
Approach
West Approach
12 T
12 R
� proach
All Vehicles
104 1557
885 1557
989 1557
880 1755
95 1755
976 1755
2261 3982
0.635 1.8
0.635 1.8
0.635 1.8
0.556 0.6
0.556 0.6
0.556 0.6
0.635 2.7
K:\-tpto\096094000 - Ever Vail\Sidra\2025 PM Total
Produced by aaSIDRA 2.0.3.217
Copyright0 2000-2002
Akcelik & Associates Ptv Ltd
Generated 8/2/2007 9:34:12 AM
•
LOS A 158
LOS A 158
LOS A 158
LOS A 133
LOS A 133
LOS A 133
LOS A 158
0.21 23.4
0.21 23.4
0.21 23.4
0.09 24.0
0.09 24.0
0.09 24.0
0.25 23.2
343
343
343
326
326
326
793
file://C:�Documents and Settings\elizabeth.goodremont�L,ocal Settings\Temp\ 3877DF2.HTM 8/2/2007