HomeMy WebLinkAboutB12-0334 Special Inspection and Testing AgreementWORK;* IlStL�•
Job Name:
Job Address:
Permit No.:
SPECIAL INSPECTION AND TESTING AGREEMENT
(To applicants of projects requiring Special Inspection or Testing per Section 1701 of the IBC)
The owner or his/her representative, on the advice of the design professional in responsible charge, shall
complete, sea], sign and submit a copy of the Special Inspection Agreement and Structural Tests
Scheduled to the Town of Vail for review and approval. Signatures are required on both pages;
photocopied or faxed signatures are acceptable.
The owner and his/her general contractor, where applicable, shall also acknowledge the following
conditions applicable to Special Inspection Testing:
1. Contractor is responsible for proper notification to the Inspection or Testing agency for items
listed.(Page 1) (IBC 1704)
2. Only the testing laboratory should take samples and transport them to their laboratory.
3. Copies of all laboratory reports and inspections are to be sent directly to the Town of Vail by the Testing
agency on a weekly basis.
4. Inspection agency to submit names and qualifications of on -site special inspectors to the Town of Vail
for review and approval.( Page 2)
5. The special inspector is responsible to immediately notify the Town of Vail Building Official in writing of
any concerns and /or problems encountered.
6. it is the responsibility of the contractor to review 'the Town of Vail approved plans for additional
inspection or testing requirements that may be noted. A pre - construction conference at the job site is
recommended to review special inspection procedures.
7. The special inspector shall use only the Town of Vail approved drawings..
8. All special inspection field reports must be left on site for review by the Town of Vail staff prior to
required inspections or re- inspections.
BEFORE OCCUPANCY WILL BE GRANTED: The special inspection agency shall submit a signed and
sealed statement that all items requiring testing and inspection were fulfilled and reported. Those items not
tested and/or inspected shall be noted in this statement. A copy of the statement shall be maintained at the
job site for the Building Inspector's review prior to final inspection.
Acknowledgement:
Owner. �•.3Q "') -. ..) '�.
3ignat �Print 'Na �' Date
Special Inspection
Agency. --
Signature
Project '
Arch/Eng:
Contractor:
Print Name
Date
&.&201
Print Name r Date
Print Name Date