HomeMy WebLinkAboutLIA ZNEIMER LOT 7 LEGAL.pdf..
~
THIS AGREEMENT, made and entered into this£ day of D&C. 19!£ by
and among a c. to/1-LL c_ (hereinafter called the "Developer"), and the TOWN
OF VAIL (hereinafter called the "Town ").
WHEREAS, the Developer, as a condition of approval of the ________ _
plans, dated , 19_, wishes to enter into a Developer Improvement
Agreement; and
WHEREAS, the Developer is obligated to provide security or collateral sufficient in the
judgment of the Town to make reasonable provisions for completion of certain improvements
set forth below; and
WHEREAS, the Developer wishes to provide collateral to guarantee performance of
this Agreement, including construction of the above-referenced improvements by means of the
following:
Devel(fer agrees to establish a cash deposit with the Town of Vail in a dollar amount
of $ \ OG'U • ~ (125 % of the total cost of the work shown below) to provide security
for the following:
IMPROVEMENT ·
\ .:.) l ~ s '-'A-.? l:::-~ Jh.,~Li!=..
(2 \\ \ "1'1o ()
•
NOW, THEREFORE, in consideration of the fo ll owing mutual covenants and
agreements, the Developer and the Town agree as follows:
1. The Developer agrees, at its sole cost and expenses, to furnish all equipment
and material necessary to p erform and complete all improvements, on or before
~u,,.c :30, /9017 . The Developer shall complete, in a good workmanlike manner, all
i provements as listed above, in accordance with all plans and specifications filed in the
office of the Community Development Department, the Town of Vail, and to do all work
incidental thereto according to and in compliance with the following:
a. Such other designs, drawings, maps, specifications, sketches, and other matter
submitted by the Developer to be approved by any of the above-referenced
governmental entities. All said work shall be done under the inspection of, and
to the satisfaction of, the Town Engineer, the Town Building Official, or other
official from the Town of Vail, as affected by special districts or service districts,
as their respective interest may appear, and shall not be deemed complete until
approved and accepted as completed by the Town of Vail Community
Development Department and Public Works Department.
2. To secure and guarantee performance of its obligations as set forth herein , the
Developer agrees to provide security and collateral as follows:
Page 1 of 3
STATE OF COLORADO
COUNTY OF EAGLE
)
) ss.
)
The foregoing Developer Improvement Agreement was acknowledged before me this
17TH day of December 1 ~~ by Ed Zne:ilner .
PLANNER, COMMUNITY DEVELOPMENT
STATE OF COLORADO )
) ss.
COUNTY OF EAGLE )
The foregoing Developer Improvement Agreement was acknowledged before me this
__ day of , 19_ by-----------------·
Witness my hand and official seal.
My commission expires: ___ _
Notary Public
updated 9/28/94
Page 3 of 3
Proposal
The Avant-gardener, Inc.
Landscape Installation & Maintenance
Proposal Submitted To
Zneimer
P.O. Box 14ll
Avon, Colorado 81620
(303) 926-1046
Proposal No.
Sheet Na.
Date 11 I 21 I 9 6
Work To Be Performed AI
Lot 7, Tract A
We hereby propose to furnish all the materials and perform all the labor necessary lor the completion of
Installation of landscap~ according to pl3r•. This does not includ~
rock creek beds.
11 s
3 1 0 I r
45 five gal. shrubs
1 Ho a crab
Perennials
All material is guaranteed to
one specifications submitted
3 8 I 1 3 61 $7733.00
$7287.00
$1225.15
508.75
1297.80
ance with the
of
).
AnY'l:rlto=+ielt-<,....tfl!'vlaltion from above specifications involving extra costs, will be executed only upon written orders, ond will
bel:Otn-e--<>el-eiktra charge over and above the estimate. All agreements contingent upon accidents or delays beyond aur control.
ry fire, tornado end other necessary insurance upon above work. Workmen's Compensation end Public Liability
above work to be taken out by The Avant-gardener, Inc.
-----------------------7~------------------
'"'""""' .. ,.m., ~tQ 9 .elL
The Avant-gardener, Inc.
Pe'----------------------------------------------------------------
Note --This proposal may days
ACCEPTANCE OF PROPOSAL
The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do the work as
specified. Payme t will be made as outlined above.
. ' 7he Avant Ga rd ene r , •
P<{(' Bo x 1411
~von , Color a d o 816 2 0
9 70 -926 -104 6
[ _ _B I LL ~~-: --------------~~---=-~]
Zn e i m~r Compa nies
2 11 Ma i n S t re e t
Mi n turn, Co l orado
..
P .O . NU MB ER
Inv oice
I _ _ DA~~ . _]~vo i CE#
1 1 /2 1/9 6 9 112
TERM S PROJE CT
Du e on re c eipt
QUANTITY
Th;m l· you '
DESC RIPTION
I n stal l a t i o n o f 1 1 sp r uce and 2 1 a~pcn t rees at Lo t 7,
Lia Zll eimer S u bdivis i o n.
RATE AMOUN T
1 5 ,020 .00 1 5 ,02 0 .00
$1 5 ,020 .00
• CDI I i:ra~~
~ I RECEIPT r;o. I I TOWN OF VAIL -------
I liz DEPARThlE.:'\"T OF CO~t!'>ltil\Tn' DEYELOP/\1£.,,7 ~ ~f1J lLC ! l'A.\rE
DATE___jb£, ~~ I , n n ol'<:<:
IS!~ ('NL/1 PRO.JECT -/}// CRECAS MADE PAY ABLE TO TOWN OF\'AIL
ACCOD:\"T ~0 . -.. ..,. v . ··-. ·-' fiL'rf ":.-'·'-.. ~--..: .... -..... ··-:'NO:' .. ·--. .-·TAX-·~ C'QSTXA:;··--TOTAl.
01 0""' • < • ."' -;-. 1 I t-.f UF t lt=f I $5.00 I•
. 01 0 $54.00 I•
01 0 I' i:=·-l 1 "<ftPi)' •:: (';:,cl-1 S39.00 I•
01 0 $37.00 I•
__Ql__Q 1 < S36.00 •
fl} 0
.. . ,..,_,. -... S37 .00 • --01 0 •
01 0 S7.00 •
~ ... ' S0.25 •
' t 1¢
,, l i•
I -' 01 O'v (' r • I T t-1 ' I i 0 S5 .00 ,•
_Ql_()Q_
,.., t 11T -• I I { 1 c -;:. 1
~ 01 OO t --I • l ri .. {
~ OJ 001 RH,0 ,_r t pal.:1
~ 01 ()()( 1 t e•(• r-aid
:=: 0 I OOC 1 L 1 . r S20.00
~ _()_1_90_(: \.:1 .. t u:-1' 1ff ,r.cl·-.. li ..-s -..
12 01 OO G c.-.-1:::
~ OJ 000 ... ~_.. -:.r t,::..' l
OJ 000 -·
~ 3J 000
'fi 01 00()1 THAt·-tl-< ·-.~c•'-'
;: .. 01 00( ~
~ • 01 OOl ' . 1-; ~
~ _Q 1 000( ) -; f'F
l£ OI~I»JJ. -l &tC£0 ___,
~ -u -I
~ .t't;C A.t'l"LlCAHU~ tt;t;:S -. -· -~ --.. ·_ ---... ·-
~ _0 10000 4J 3;)0 !A DDITIONA L GR I-A "2 50 $200.00
~ 01 0000 413 30 ICONDITJ ONA L USE PER.MJ T S200.00
·~ _0_!_00()0 <1 J330 ,EXTER1()R A LTERA T1 0N [LESS T HAN 100SQ.rT] S200 .00
~ 01 000 0 4 133 0 . EX TERlOR A L T ERA TI 0 :-.1 [MORE THAN 100 SQ .FT.) S500.00_
~ 0 1 0000 41 33 0 SP ECIA L DEVE L OP~1 t N T DI STRIC I [NI::.WJ 51 ,500.00 l!::.
~ 0 1 0000 4 13 3 0 SPECIAL DE VELO PMEN T DISTRICT [MAJOR AMEND] SJ n m oo ~
~ 01000 0 41330 SPECIAL DEVE LOPMEN T DI STR IC T [M INOR AMEND] S200.QQ_
.~ 01_QOQO 4 1330 SU B DI VI S ION
'f.. _()1 0000 41 33 0 V ARlA NCE S250.0_Q_ ~
_Ql_()()OO 413 3 0 ZON IN G C O DE AMENDM ENTS $250.00 j
01 0000 413 30 _R_E ZON!l\G $2 00.00 ~
OTHE R
~ lUTHER
~ (f)_~--TOTAL: /'>' t»v
) I
''"""'''~·..-. ...._ u /
~
! I) i
~ CASH r ] CK .o [ to~h 11-I.O W REC.BY·Wl.~ j ~
I Rev.'..osed 5/1/92 .. Date Receiv •• the Community ·
Development tment : _______ _
APPLICATION FOR
SINGLE FAMILY SUBDIVISION
CHAPTER 17.25 VAIL MUNICIPAL CODE
(PLEASE PRINT OR TYPE)
A. APPLICANT Alp ine Engi neeri ng, Inc.
MAILING ADDRESS~P~·~O~·~B~o~x~9~7~----------------------------------
----------------~E~d~w~a~r~d~s~~c~o~~8~1~6~3~2~---------PHONE 970 926 -3373
B.
C. LOCATION OF PROPOSAL:
STREET ADDRESS 1726, 1730 Buffe hr Cree k Road
LOT 6/7 BLOCK ____ SUBDIVISION Lia Zneimer FILING __ 2 __ _
D. APPLICATION FEE $100.00 PAID ___ _ CHECK# ___ _
E. MATERIALS TO BE SUBMITTED:
'-t-
o
1. Two mylar copies and one paper copy, of the subdivision plat
shall be submitted to the Department of Community Development.
The plat shall include the following:
Jf .
,/ ...... g.
The final plat shall be drawn by a registered surveyor in
India ink, or other substantial solution, on a reproducible
medium (preferably mylar) with dimension of twenty-four by
thirty-six inches and shall be at a scale of one hundred
feet to one inch ·or larger with margins of one and one -half
to two inches on the left and one-half inch on ·all other
sides.
Accurate dimensions to the nearest one-hundredth of a foot
for all lines, angles and curves used to describe
boundaries, streets, setbacks, alleys, easements,
structures, areas to be reserved or dedicated for public or
common uses and other important features. All curves shall
be circular arcs and shall be defined by the radius, central
angle, are scored distances and bearing. All dimensions,
both linear and angular, are to be determined by an accurate
control survey in the field which must balance and close
within a limit of one in ten thousand.
North arrow and graphic scale.
A systematic identification of all existing and proposed
buildings, units, lots, blocks, and names for all streets.
An identification of the streets, alleys, parks, and other
public areas or facilities as showri on the plat, and a
dedication thereof to the public use. An identification of
the easements as shown on the plat and a grant thereof to
t .hP. rmhl i r ll.~P ~r<:>~'3 !:"<:'~<:'!""i::?d fC'!" f'..!:_'..!!:"e 1=''..!:!:)li_~
acquis iti on shall also be shown on the plat.
A written survey description of the area including the total
acreage to the nearest appropriate significant figure. The
acreage of each lot or parcel shall be shown in this manner
as well.
A description of all survey monuments, both found and set,
which mark the boundaries of the subdivision, and a
description of all monuments used in conducting the survey.
Monument perimeter per Colorado statutes . Two p erimet e r
monuments s hall be established as major control monuments,
the mat erials which shall b e determined by the town
engineer.
75 South Frontage Road
Vail, Colorado 81657
970-479-2138/479-2139
FAX 970-479-2452
March 26, 1996
MikeDumage
Alpine Engineering
Fax# 926-3390
Dear Mike.
Department of Community Development
Here is the recommended text for the single family subdivision plat notes for lots 6 and 7. Check
these out with Ed Zneimer to make sure he is ok with these notes. These notes summarize the
restrictions pl ace d on the dcYclopmcnt of these lots by the Planning and Environmental
Commission when they amended the Eagle County approved development plan for the property.
Pl at Notes-Lia Zncimcr lots 6 and 7:
1. For zoning purposes, lots 6 and 7 created by this subdivision arc to be treated as separate lots,
with no more than one single family dwelling unit and one attached employee dwelling unit
(caretaker apartment) allowed on each lot. Each single family dwelling unit shall be allowed a
maximum of 4.500 square feet ofG RFA. with an additional 800 square feet ofGRFA allowed for
the construction of an attached employee dwelling unit.
2. All caves, decks , porches. patios , fences and accessory structures must be contained
completely within)J;!e approved buildin g envelopes for ·cach lot as shown herein.
If you have any questions please call me at 4 79-2150.
Sincerely,
1?4~£,
Randy Stouder
Town Planner
0 Rl::Cl 'CLI:."D PAPER
MAR -27 -96 14 •53 FRQM , LANO TITLE GUARANTEE VAIL 10 • 3 03 476 4534
--AND TITLE GUARANTEE COMP~
CUSTOMER D I S T R I B U T I 0 N
March 27, 1996 Our Order No.: V252913
Property Address :
~INE ENGINEERING
P .O . BOX 97
EDWARDS , CO 81632
Attn : MIKE DULMAGE
FAX 926 -3390
Cop i es : 1 via US Postal Service
MAR-27-1996 14:55 303 4764534 87%
PAGE
P.01
March 27, 1996
Buyer/Bo rro wer :
Seller /Owner :
Property Address:
our Order No .: V252913
BUFFE HR CREEK PARTNERS, A COLORADO LI MITED
PARTNERSH I P
If you have any inqu1r1es or require further assistance, please
contact o n e of the numbers listed below:
For Closing Assistance :
Phone :
Fax :
For Title Assistan ce :
JILL WELLS
108 S. FRONTAGE RD W.
VAIL, CO 81658
Phone : 970 476-2251
Fax: 970 476-4534
Note : once an original commitment has been issued, any subsequent
changes will be emphasized by underlining .
THANK YOU FOR YOUR ORDER!
MAR-27-1996 14:55 3034764534 87% P .02
OLD REPUDL IC NAT I ON AL TITL E I NS tJR;.....'-,: C01"1P A."\Y
~LTA COMMITME ..
-Ch a rges -
ALTA Owner Policy
--TOTAL
SCHEDULE A
our Order # V252913
For Information Only
••• THIS IS NOT AN INVOICE, BUT AN ESTIMATE OF FEES. WHEN REFERRING
TO THIS ORDER, PLEASE REFERENCE OUR ORDER NO. V252913 •••
1. Effectiv e Date : Ma rch 15, 1996 at 5:00 P.M .
2. Policy to be issued, and proposed Insured:
"ALTA" Owner's Policy 10-17-92
Proposed Insured:
BUFFEHR CREEK PARTNERS, A COLORADO LIMITED PARTNERSHIP
3. The estate or interest in the land described or referred to in
this Commitment and covered herein is:
A Fee Simple
4. Title to the estate or interest covered herein is at the
effective date hereof vested in:
BUFFEHR CREEK PARTNERS , A COLORADO LIMITED PARTNERSHIP
5. The land referred to in this Commitment is described as
follows :
TRACT A, FIRST AME~~MENT TO THE LIA ZNEIMER SUBDIVISION,
ACCORDING TO TIIE PLAT RECORDED APRIL 1, 1994, IN BOOK 636 AT
PAGE 431, COUNTY OF EAGLE, STATE OF COLORADO .
==·
PAGE 1
. MAR-27-1996 14:56 3034764534 P.03
A L T A C 0 M M I T M E N T
~CHEDULE B-l ..
(Requirements) our Order # V252913
The following are the requirements to be complied with :
1. Payment to or for the account of the grantors or mortgagors of
the full consideration for the estate or interest to be
insured .
2. Proper instrument(s) creating the estate or interest to be
insured must be executed and duly filed for record, to-wit:
THIS COMMITMENT IS FOR INFORMATION ONLY, AND NO POLICY WILL BE ISSUED
PURSUANT HERETO .
...
THE COUNTY CLERK AND RECORDERS OFFICE REQUIRES RETURN
ADDRESSES ON DOCUMENTS SENT FOR RECORDING!!
••••••••••••••••••••••••• NOTE ••••••*********************
RECORDING FEES HAVE INCREASED AS OF JULY 1, 1995 TO $6.00
FOR THE FIRST PAGE AND $5.00 FOR EACH ADDITIONAL PAGE.
RELEASES P~VE INCREASED TO $14.00 FOR THE FIRST PAGE AND
$5.00 FOR EACH ADDITIONAL PAGE.
PAGE 2
MI=!R-27-1996 14:57 3034764534 P.04
A L T A C 0 M M I T M E N T ee SCHEDULE 8-2 ..
(E x cepti o ns) Our Order # V252913
The policy or policies to be issued will contain exceptions to the
following unless the same are disposed of to the satisfaction o f
the Company:
1. Standard Exceptions 1 through 5 printed on the cover sheet.
6. Taxes and assessments not yet due or payable and special
assessments not y~t certified to the Treasurer's office .
7. Any unpuid taxes or assessments against said land.
8. Liens for unpaid water and sewer charges, if any.
9. RIGHT OF PROPRIETOR OF A VEI~ OR LODE TO EXTRACT AND REMOVE HIS ORE
THEREFROM SHOULD THE SAME BE FOUND TO PENETRATE OR INTERS~CT THE PREMISES
AS RESERVED IN UNITED STATES PATENT RECORDED August 16, 1909, IN BOOK 48 AT
PAGE 542.
10. RIGHT OF' WAY FOR DITCHES OR CANALS CONSTRUCTED EY THE AUTHORITY OF THE
UNITED STATES AS RESERVED IN UNITED STATES PATENT RECORDED August 16, 1909,
!~BOOK 48 AT PAGE 542.
11. RESTRICTIVE COVENANTS, WHICH DO NOT CONTAIN A FORFEITURE OR REVERTER
CLAUSE, BUT OMITTING RESTRICTIONS, IF ANY, BASED ON RACE, COLOR, RELIGION,
OR NATIONAL ORIGIN, AS CONTAINED IN INSTRUMENT RECORDED September 20, 1972,
IN BOOK 225 AT PAGE 443 AND AS AMENDED IN INSTRUMENT RECORDED September 29,
1972, IN BOOK 225 AT PAGE 565 Ah~ AS AMENDED IN INSTRUMENT RECORDED January
22, 1974, IN BOOK 233 AT PAGE 53 AND AS AMENDED 1N INSTRUMENT REC~RDED JULY
1, 1983 IN BOOK 362 AT PAGE 804.
UTILITY EASEMENTS 20 FEET IN WIDTH, 10 FEET ON EACH SIDE OF ALL INTERIOR
LOT LINES AND A 15 FOOT UTILITY EASEMENT ALONG AND ABUTTING ALL EXTERIOR
LOT LINES AS RESERVED ON THE PLAT OF LION'S RIDGE SUBDIVISION, FILING
NO. 2.
13. AGREEME~7 BETWEEN TAYVEL ENVIRONME~7AL LAND COMPANY AND MOUNTAIN STATES
TELEPHONE AND TELEGRAPH COMPANY RECORDED SEPTEMBER 27, 1973 IN BOOK 231 AT
PAGE 291.
14. TERMS, CONDITIONS AND PROVISIONS OF PLANNED UNIT DEVELOPMENT PLAN AND
DECLARATION OF PROTECTIVE COVENANTS RECORDED March 27, 1980 IN HOOK 300 AT
PAGE 758 AND RE-RECORDED APRIL 10, 1980 IN BOOK 301 AT PAGE 415.
Jis. EASEMENT AS GRANTED TO LION'S RIDGE WATER DISTRICT AND VAIL VILLAGE WEST
WATER Ah~ SANITATION DISTRICT IN INSTRUMENT RECORDED MAY 22, 1981 IN BOOK
323 AT PAGE 505, AND AS SHO~~ ON THE PLAT OF LIA ZNEIMER SUBDIVISION
RECORDED AUGUST 30, 1991 IN BOOK 561 AT PAGE 208.
PAGE 3
MAR-27-1996 14:57 3034764534 87'/. P.05
c 16.
A L T A C 0 M M I T M E N T
.. SCHEDULE B·2 ..
(Exceptions) Our Order # V252913
EASEMENTS, RESERVATIONS AND RESTRICTIONS AS SHOWN OR RESERVED ON THE
RECORDED PLAT OF LIONS RIDGE SUBDIVISION, FILING NO. 2 .
~17. EASEMENTS, RESERVATIONS AND RESTRICTIONS AS SHO~ OR RESERVED ON THE PLAT
OF LIA ZNEIMER SUBDIVISION RECORDED August 30 , 1991 IN BOOK 561 AT PAGE
208.
ROAD, UTILITY AND DRAINAGE EASEMENTS AS SHOWN Ah~ CREATED ON THE PLAT OF
LIA ZNEIMER SUBDIVISION RECORDED AUGUST 30, 1991 IN BOOK 561 AT PAGE 208.
UNDERGROUh~ RIGHT OF WAY EASEMENT AS GRANTED TO HOLY CROSS ELECTRIC
ASSOCIATION, INC ., IN INSTRUMENT RECORDED AUGUST 8, 1991 IN BOOK 559 AT
PAGE 506 AND IN INSTRUMENT RECORDED SEPTEMBER 5, 1991 IN BOOK 561 AT PAGE
501, AND AS SHOWN ON THE RECORDED PLAT.
20. TERMS, CONDITIONS AND PROVISIONS OF TRENCH, CONDUIT AND VAULT AGREEMENT
RECORDED August 21, 1991 Hi BOOK 569 i"!F PAGE 497 .
21 . RESTRICTIVE COVENANTS WHICH DO NOT CONTAIN A FORFEITURE OR REVERTER CLAUSE,
BUT OMITTING RESTRICTIONS, IF ANY, BASED ON RACE, COLOR, RELIGION , OR
NATIONAL ORIGIN, AS CONTAINED IN INSTRUMENT RECORDED October 05 , 1992, IN
BOOK 590 AT PAGE 722, FIRST AMENDMENT AND SUPPLEMENT RECORDED JUNE 6, 1994
IN BOOK 642 AT PAGE 116, SECOND AMENDMENT AND SUPPLEMENT TTO RECORDED
OCTOBER 6, 1995 IN BOOK 677 AT PAGE 744.
22. TERMS, CONDITIONS AND PROVISIONS OF EASEMENT DEED RECORDED October 05, 1992
IN BOOK 590 AT PAGE 723.
23. TERMS, CONDITIONS AND PROVISIONS OF CONTRACT MEMORANDUM RECORDED May 14,
1993 IN BOOK 608 AT PAGE 921.
24. UNDERGROUh~ RIGHT OF WAY EASEMENT AS GRANTED TO HOLY CROSS ELECTRIC
ASSOCIATION, INC . IN INSTRUMENT RECORDED JULY 12, 1993 IN BOOK 613 AT PAGE
586, AND AS SHOWN ON TnE RECORDED PLAT.
25 . TERMS, CONDITIONS AND PROVISIONS OF TRENCH, COh"DUIT AND VAULT AGREEMENT
RECORDED July 28, 1993 IN BOOK 614 AT PAGE 971.
26 . EASEMENTS, RESERVATIONS AND RESTRICTIONS AS SHOWN OR RESERVED ON THE PLAT
OF FIRST AMENDMENT TO THE LIA ZNEIMER SUBDIVISION RECORDED April 01, 1994
IN BOOK 636 AT PAGE 431 .
27. DEED OF TRUST DATED November 27, 1995, FROM BUFFEHR CREEK PARTNERS, A
COLORADO LIMITED PARTNERSHIP TO THE PUBLIC TRUSTEE OF EAGLE COUNTY FOR THE
USE OF FIRSTBANK OF AVON TO SECURE THE SUM OF $885,000.00 RECORDED December
08, 1995, IN BOOK 683 AT PAGE 126 .
PAGE 4
MAR-27-1996 14:58 3034764534 87% P.06
A L T A C 0 ~ M I T M E N T
~CHEDULE B-2 ..
(Exceptions) our Order # V252913
DISBURSER'S NOTICE IN CONNECTION WITH SAID DEED OF TRUST WAS RECORDED
December 08, 1995, IN BOOK 683 AT PAGE 127.
PAGE 5
MAR-27-1996 14:59 3034764534 P.07
..
L A N L E G U A R A N T E E C 0 M P A N Y ..
DISCLOSu~E STATEMENT
Requ i red by Senate Bill 91 -14
A) The subject real property may be located in a special taxing
district.
B) A Certificate of Taxes Due listing each taxing jurisdiction
may be obtained from the County Treasurer or the County
Treasure r's authorized agent.
C) ThP. information regarding special districts and the boundaries
of such districts may be obtained from the Board of County
Commissioners, the County Clerk and Recorder, or the County
Assessor .
Required by Senate Bill 92-143
A) A Certificate of Taxes Due listing each taxing jurisdiction
shall be obtained from the County Treasurer or the County
Treasurer's authorized agent .
MAR-27-1996 14:59 3034764534 . 87/. P.08
•
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
PROJECT TITLE: BUFFEHER CREEK CHALET 7
NEW (SFR,PjS,DUP) PERMIT Permit #: B95-0313
75 South Frontage Road
Vail, Colorado 81657
970-479-2138/479-2139
FAX 970-479-2452
Department of Community Development
/730
Job Address:
Location ... :
Parcel No .. :
Project No. :
~ BUFFEHR CREEK RD
BUFFEHER CREEK CHALET 7
2103-122-10-007
PRJ95-0194
Status ... : ISSUED
Applied .. : 09/18/1995
Issued ... : 10/30/1995
Expires .. : 04/27/1996
APPLICANT ZEEB CONSTRUCTION CO Phone: 3039493292
P 0 BOX 1997, AVON CO 81620
CONTRACTOR ZEEB CONSTRUCTION CO Phone: 3039493292
P 0 BOX 1997, AVON CO 81620
OWNER BUFFEHR CREEK PARTNERS
PO BOX 305, MINTURN CO 81645
Description:NEW SFR
Occupancy Type
Number of Dwelling
Factor Sq. Feet
Units: 001
Valuation
382,052.76 Dwellings Zone 2 V-N
Private Garages Zone 2 V-N Masonry
Table Date: 06/20/1995
Town of Vail
93.48 4,087
27.60 456
Subtotal: 4,543
Total Valuation:
Adjusted Valuation:
12,585.60
394,638.36
394,638.36
454,000.000
Fireplace Information : Restricted: y #Of Gas Appliances : #Of Ga s Logs: 2 #O f Wood/Pal l et :
*********************************************************** FEE SUMMARY **********************************************************
Building-----> 2,156.00 Restuarant Plan Review--> .00 Total Calculated Fees---> 4,941 .85
Plan Check---> 1,401 .40 ORB Fee-----------------> 200 .00 Additional Fees---------> .00
Investigation> .00 Re creation Fee----------> 681 .45 Total Permit Fee--------> 4,941 .85
Will Call----> 3 .00 Clean-Up Deposit--------> 500 .00 Payments----------------> 4,941.85
TOTAL FEES--------------> 4,941 .85 BALANCE DUE-------------> .00
**********************************************************************************************************************************
Item: 05100 BUILDING DEPARTMENT Dept: BUILDING Division:
09/19/1995 CHUCK Action: APPR
Item: 05400 PLANNING DEPARTMENT Dept: PLANNING Division:
10/03/1995 RANDY Action: APPR see conditions
Item: 05600 FIRE DEPARTMENT Dept: FIRE Division:
09/19/1995 CHUCK Action: APPR
Item: 05500 PUBLIC WORKS Dept: PUB WORK Division:
10/19/1995 CHUCK Action: APPR
**********************************************************************************************************************************
See Page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, co.pleted an accurate plot
plan, and state that all the information provided as required is correct . I agree to comply with the information and plot plan,
to comply with all Town ordinances and state laws , and to build this structure j ording to the T
codes, design review appro ved, Uniform Building Code and other ordinances of
Send Clean-Up Deposit To: SIGNA 0 RECYCLEDPAPJ:.'R
•
75 South Frontage Road
Vail, Colorado 81657
970-479-2138/479-2139
FAX 970-479-2452
Department of Community Development
PAGE 2
********************************************************************************
Permit #: B95-0313
CONDITIONS OF APPROVAL
as of 10/30/95 Status: ISSUED
********************************************************************************
Permit Type: NEW (SFR,PjS,DUP) PERMIT
Applicant: ZEEB CONSTRUCTION CO
Job Address: 1726 BUFFEHR CREEK RD
Location: BUFFEHER CREEK CHALET 7
Parcel No: 2103-122-10-007
Applied: 09/18/1995
Issued: 10/30/1995
********************************************************************************
CONDITIONS
********************************************************************************
1. THIS PROJECT WILL REQUIRED A SITE IMPROVEMENT SURVEY. SUCH
SURVEY SHALL BE SUBMITTED AND APPROVED PRIOR TO REQUEST FOR
A FRAME INSPECTION.
2. ATTIC SPACES SHALL HAVE A CEILING HEIGHT OF 5 FEET OR LESS,
AS MEASURED FROM THE TOP SIDE OF THE STRUCTURAL MEMBERS OF
THE FLOOR TO THE UNDERSIDE OF THE STRUCTURAL MEMEBERS OF THE
ROOF DIRECTLY ABOVE.
3. The limits of disturbance shown on the site plan must be
staked out by a surveyor prior to and site disturb activity.
Snow fence must be installed along entire limits of disturb.
and maintained up and in good condition at all times until
construction is complete.
4. Exterior lights must meet the requirements of the lightling
ordinance. use of recessed can lights is strogly encouraged
5. Culverts at driveway are NOT approved. A bridge will be
substituted for the culverts as shown on DRB approved site
plan for lot 6. Bridge plan to be engineered and submitted
to public works for review and approval.
6. Final pond design (engineered) and landscape plan to be
submitted for DRB review and approval prior to issuance of a
TCO for this house.
7. Platting of property required before TCO.
0 RECI'CLEDPAPER
• ****************************************************************
TOWN OF VAIL, COLORADO Statemnt
****************************************************************
Statemnt Number: REC-0092 Amount: 4,741~85 10/30/95 15:44
Init: JR Payment Method: CK Notation: 2215
Permit No:
Parcel No:
Site Address:
Location:
This Payment
B95-0313 Type: B~BUILD
2103-122-10-007
1726 BUFFEHR CREEK RD
BUFFEHER CREEK CHALET 7
Total
4,741.85 Total ALL
NEW (SFR,P/S,DUP) PE
Fees:
Pmts:
Balance:
4,941.85
4,941.85
.00
****************************************************************
Account Code Description Amount
01 0000 41310 BUILDING PERMIT FEES 1,956.00
01 0000 41331 DESIGN REVIEW FEES 200.00
01 0000 41332 PLAN CHECK FEES 1,401.40
01 0000 22002 CLEANUP DEPOSITS 500.00
30 0000 45032 RECREATION FEES 681.45
01 0000 41336 WILL CALL INSPECTION FEE 3.00
•
CIIECK REQUEST
PREPARED BY: DATE:
VENDOR NAME.
VENDOR NUMBER :
DESCRIPTION OF EXPENSE: CLEAN UP DEPOSIT REFUND FOR BP #/8 9S-tJ3/
NAME oF JoB: 3 u r~;; /I~ c,eG£/c:. 171? r ,J 6;<?_
ACCOUNT NUMBER: 01 0000 22002
\ ~80 .. ,~ AMOUNT OF REFUND: u ()'-€./
DATE APPROVED :
APPROVAL SIGNATURE:
<1
t
r
r
t
i
f
t
n
t
t
r
nf
®r
r
u
p
a
u
r
y
Wn
m
t
t
®f
ll
n
i
l
ll
u
i
l
b
i
n
g
il
r
p
a
r
t
m
r
n
t
TH
I
S
CE
R
T
I
F
I
C
A
T
E
.
IS
S
U
E
D
PU
R
S
U
A
N
T
TO
T
HE
.
RE
Q
U
I
R
E
M
E
N
T
S
OF
TH
E
UN
IF
O
R
M
B
U
I
L
D
I
N
G
CODE
CE
RT
I
F
Y
I
N
G
TH
A
T
AT
TH
E
T
I
M
E
OF
IS
S
UA
N
C
E
TH
I
S
ST
R
U
CTU
R
E
WA
S
I
N
CO
M
P
I
.
I
A
N
C
E
W
I
T
H
THE
VA
R
IO
U
S
OR
D
IN
A
N
CE
S
OF
TH
E
T
O
W
N
RE
G
U
L
A
T
I
N
G
BU
IL
D
I
N
G
CO
N
S
T
R
U
C
T
I
O
N
.
A
N
D
OR
USE. TO
TH
E
BE
S
T
OF
OU
R
KN
O
W
I
.
E
D
G
f
.
.
1\
:
a
m
t
:
-
BU
F
F
E
H
R
CR
E
E
K
PA
R
T
N
E
R
S
-
-
-
-
--
-
-
-
-
-
-
-
-
-
-
-
-
-
-
---
-
-
-
-
-
ll
s
l
'
Cla~
~
ifi
c
a
r
i
o
n
Ne
w
SF
R
G
r
o
u
p
R3
/
M
l
_
_
_
_
_
_
_
_
Bu
i
l
d
i
n
g
Pt
:
r
m
i
r
N
o
.
B9
5
-
03
1
3
T
y
p
l
'
C
o
m
r
r
u
c
r
i
o
n
V
-
N,_
,
_
_
_
_
_
_
O
w
n
e
r
o
f
Bu
i
l
d
i
n
g
BU
F
F
E
H
R
CR
E
E
K
PA
R
T
N
E
R
S
-
P
.
0
.
Bo
x
3
0
5
,
M
i
n
t
u
r
n
,
CO
81
6
4
5
Bu
i
l
d
i
n
g
A
d
d
r
e
ss
17
3
0
B
u
f
f
e
h
r
Cr
e
e
k
Ro
a
d
w
-
l
~
tm~
Th
e
bu
i
l
d
i
n
g
of
f
i
c
i
a
l
ma
y
,
in
wr
i
t
i
n
g
,
su
s
p
e
n
d
or
re
v
o
k
e
a Certificate
of
Oc
c
u
p
a
n
c
y
is
s
u
e
d
un
d
e
r
th
e
pr
o
v
i
s
i
o
n
s
o
f
th
i
s
co
d
e
whenever the
ce
r
t
i
f
i
c
a
t
e
is
is
s
u
e
d
in
er
r
o
r
,
o
r
on
tb
e
ba
s
i
s
of
in
c
o
r
r
e
c
t
information
su
p
p
l
i
e
d
,
or
wh
e
n
it
is
de
t
e
r
m
i
n
e
d
tb
a
t
th
e
bu
i
l
d
i
n
g
or
structure or
po
r
t
i
o
n
th
e
r
e
o
f
is
in
vi
o
l
a
t
i
o
n
of
an
y
or
d
i
n
a
n
c
e
or
re
g
u
l
a
t
i
o
n
of the
To
w
n
o
f
Va
i
l
or
an
y
of
th
e
pr
o
v
i
s
i
o
n
s
of
th
i
s
co
d
<
:
.
Bu
i
l
d
o
n
l
(
Of
f
i
c
i
a
l
P
O
S
T
I
N
A
C
O
N
S
P
I
C
U
O
U
S
P
L
A
C
E
• •
. -· -· 11tWN OF VAIL CONSTRUCTION
PERMIT APPLICATION FORM
DATE: q .\'2.·9.'2 • t
S£P 1 3 1995
AP P LICAT ION MUST BE FILLED OUT COMPLETELY OR IT MAY NOT r DE~ DEP\
)(••*************************** PERMIT INFORMA~ION .*********************;****:**
~-Bui ldin g ( )-Plumbing ( )-Electrical [ )-Me chanical ( )-Other ______ __
~ Cfff'f-CHALET tr ,~ 1.---J? Job Nam e: Job Address: ·\1'2.;0 ~ ~ f'Oi"cc
Legal De script i on: Lot t ~t A Filing SUBDIVISION: L \A Wt\Mt:=:t:z-
Own e rs Nam e: w~ ZN~Me=F-Address: f.'O. ~ ~~~ MIN1VfN Ph.ro-1-11o\
~~\..}J\ ~~
Arc hi teet: A\..M bizc+t tl'fi:--1?. 1\•Jc;.. Address: f?O. ~ '?'.J-\ \ . VAl\.., Ph .&"":t.qlP;O
. 1 I
Gene ral De scription: 7~N~ ~\l)j fZ-e"':::A~
<,'
Work Class: ~-New ( )-Alteration ( )-Additional [ )-Repair [ )-Other ________ _
Number of Dwelling Units: Number of Accommodation Units:
~ ~mber a nd Type of Fireplaces: Ga s Ap p liance s ____ Gas Logs Wood/Pellet
~********************************* VA LUATIONS *********************************
BUI LDING: $ Q-1-B, ~ ELECTR I CAL:$ OTHER:$
P LUMBING : $ MECHANICAL: $ TOTAL: $:--""-,-f -r-"5...,..?;:--r/--)2--.-CJ...,...,---
·**************e~·g/i::t?J ?*Y CONTRACTOR INFORMATION ***************************
e n e ral Contractor: ~ cLlH~T\~, lNC. Town of Va il Reg. NO. 3Jjj 0
Ad dress: P.o.~ \~:t 1 AvoN. C...O BI!R~ ~hone Numb e r: ~:1;]-9'20e! -·--Lf'1 •:) "'\ '1 d-
Electric al Contractor: aB ~ 695-01\:?:> Town of Vail R g. NO.-.
Ad dress: ~ Phone Number:
Plumbing Contractor:
Address: ·
Town of Vail Re g. NO. ______ _
Pho ne Number: ---------------------------------------
Mechani ca l Contractor:
Addres s :
. ********************************
' BPILDING PERMIT FEE:
P LUMBING PERMIT FEE:
MECHANI CA L PERMIT FEE:
ELECTRICAL FEE:
OTHER TYPE OF FEE:
DRB FEE:
TYP E GRO UP SQ. FT. VALUATION
~
T own of Va il Reg. NO. ______ _
P hone Numb e r :
FOR OFFICE USE *******************************
BUILDING PLAN CH ECK FEE:
PLUMBING PLAN CHECK FEE:
MECHANICAL P LA N CHECK FE E :
RECREATION FEE: /2.£ ~ (.
CLEAN -UP DEPOSIT:
TOTA L PERMIT FEE ~
BUILDING: 0 ~
SIGNATURE: ;~~~~~~RE: t2?J 1Z" ;:v<Z:::::
-
comme nts: ---.-p&o::;__~-z-r.~F--· ....,....:. ·~1J~:,.,n~/~-;nq-==-)-r-~~=:---~£;....--p~YI~zr-7<:--------
75 South Frontage Road
Vail, Colorado 81657
970-479-2138/479-2139
FAX 970-479-2452
• Lh -Q. I VI V\ p '--"
\3UF'FCIL ~t"ICK cS.~TS -"rc., -41;
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ELECTRICAL PERMIT Permit #: E95-0270
Department of Community Development
Job Address:
Location ... :
Parcel No .. :
Project No.:
1726 BUFFEHR CREEK RD
ZNEINNNER RESIDENCE
2103-122-10-007
PRJ95-0194
Status ... : ISSUED
Applied .. : 11/13/199:
Issued ... : 11/13/199:
Expires .. : 05/11/199f
APPLICANT WAGNER ELECTRIC INC Phone: 3039496161
P.O BOX 4995, VAIL CO 81658
CONTRACTOR WAGNER ELECTRIC INC Phone: 3039496161
P.O BOX 4995, VAIL CO 81658
OWNER BUFFEHR CREEK PARTNERS
PO BOX 305, MINTURN CO 81645 I 1 ·~ 6
Descr i ption: TEMPORARY POWER Valuation: 500.00
*********************************************************** FEE SUMMARY **********************************************************
Electrical--->
ORB Fee --->
Investigation>
Will Call---->
TOTAL FEES--->
50.00
.00
.00
3.00
53.00
Total Cal culated Fees--->
Additional Fees--------->
Total Permit Fee-------->
Payments---------------->
BALANCE DUE------------->
53 .00
.00
53 .00
53.00
.00
**********************************************************************************************************************************
Item: 06000 ELECTRICAL DEPARTMENT
11/13/1995 DAN Action: APPR
Dept: BUILDING Division:
**********************************************************************************************************************************
CONDITION OF APPROVAL
**********************************************************************************************************************************
DECLARATIONS
I hereby acknowledge that I ha ve read this application, filled out in full the inf ormation required, completed an accurate plot
plan, and s tate that all the information provided as required is correct. 1 a gree to comply with ·the information and plot plan,
to comply with all Town ordinances and s tate Laws, and to build this structure ac cording to the Town's zoning and s ubdiv i sion
codes, design review approved, Unifo r m Building Code and other ordinances of the Town applicable thereto .
REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8:00 AM 5 :00 PM
0 RECYCLEDPAPER
• ••
****************************************************************
TOWN OF VAIL, COLORADO Staternnt
**************************************************~*************
Statemnt Number: REC-0099 Amount: 53.00 11/13/95 12:56
Init: LRD Payment Method: CHECK Notation: #11635
Permit No:
Parcel No:
Site Address:
Location:
This Payment
E95-0270 Type: B-ELEC
2103-122-10-007
ELECTRICAL PERMIT
1726 BUFFEHR CREEK RD
ZNEINNNER RESIDENCE
Total Fees:
53.00 Total ALL Pmts:
Balance:
53.00
53.00
.00
****************************************************************
Account Code
01 0000 41313
01 0000 41336
Description
ELECTRICAL PERMIT FEES
WILL CALL INSPECTION FEE
Amount
50.00
3.00
~ > \g -C-\~-03~1
A 'l'OWN OF VAIL CONSTRUCT ~~ fi PEIUII T I! 1 J'A p.r:;··~· .:~:·_~1 9.~ ~~-=J~.J PERMI T l;.PPLICATION FO ~ ~ ~ ., ~ lif 171 -ffl -
t.i ... # oATE : \\ \-'\~ 'l lrj-:t_ ~ \vf 1
I ArP L lCA'r iON MUS'l ' BE f J.LtED OUT COMPLETELY OR IT MJ} ~ OT BE ACCEPTED 1
•• N 0 V 0 8 1995
·~nd•**idr <lf ********11 "~<w .;,**w*w ***** PERMIT INFORMA 'f iON *'~~**** *** * * ~-f \ .
[ ) -nui h1ing ( ) -Pl u mb .i.ng DQ-Elact rical [ J -Meehan! 1
Jub NawH : -;~n Ji rLL{)-l.G._ ___ Job ~€k:.tf7 . .ali~-b~uoo.k. ~
Legal IJcscription : Lot______ a loc k~··--Filing _..s.l.lWYl.S~-~~~
OWllCl:'6 l lilme : 2.n ~..LI'fY\.lYX'--~·----Act tlress: l:L2L~-"t::>.~-~h ._-:-----
1\d d raes: -----·--·------Ph .·--·--
Gen•·r.al u~~:-;criptio n: .~L~!IlP-.----J2.9...~_E...__{}n L ~l ---· ~ .. ----·---
HorJ.. Cl nc:.;: [XJ ··Now ( ]-Alte r at ion ( )-Additional [ )-Repair [ )-Other __ ...._ ...
Ntm·l)er of Dwelli ng Uni t.fi: _L_ Number of Ac commodation Un5.ts: ~
'
1 Jl i,tlCl: and rl'y pa of Fh.-e p l lv ;es : Gas Appliances~ Gas Loge:_~~-Wood/Pellet_
A
~ J.w .;., * "'~= >~o ***** *** * * *~ * w.Jt -~tw * **** n ~ •• * VALUJ\.TIONS ••*********** ************** ****r f .
.., . ---
BU I Uil NG: $ l LECTRICAL: $ 5 00 :....._
PLUN OING: $ ]'II~C HANICAL: $
OTHER: $
TO TAL: r-·
~ ----------~~!~~~~~~ •• ~~***·*~~~~~ ••• ~****
1 • """""~ ft " """"w " co TRACTOR INFORMATION***'~~*********************~
•
1 1::on o ral c o n t ractor: -·-------__ Town of Vail Reg. NO. __ _
1\d uress: ____ I'honG Number: -· .. -----·--
J::le:ct r h ·~l c o n tractor: I q~f -~}?0!
Jl.ddrcss: =:¥~ -~~ ~~ :C~I~.J
~q5=-b27D
i'l u nt b~n g c ontractor! __ _ __ . -------
1\dcl t'f.'~.s s:
Town of Vail Reg. No .~~3 -~
Phone Nun\ber: ,Qld 9 -I 'OI."lR..L
Town of Vail Reg. NO. ____ _
Phone Number:
Jl ec h~n ica l Co ntract o r :
+.**w~*~**~***•********w*******~.;,
UUILDING PERMIT FEE:
PLUi·:lHNG PERMIT FEE:
HECHANICAL PERMIT FEE:
.F'LECTR!CAL FE E:
OTHER l'YPE OF FEE:
DHB FEE:
j 'l' 1 1)E ,.G R.ouj-s~. :FT./VALUATION
1----.
! -.. ----
Town of Vail Reg . NO. ____ _
Phc;m e Number: ~---·--
fOR OFFICE USE *****************~**********~*
BUILDING PLAN CHECK FEE:
PLUMBING PLAN CHECK FEE :
MECHANICAL PLAN CHECK FEE:
.RECREATION FEE :
CLEAN-UP DEPOSIT:
TOTAL PERMIT FEES:
::.£~ L/·:o,~S:-= BU I LDING:
SIGNATURE:
ZONING:
SIGNATURE:
~o m m Cl J t s:_~--~-~~-~~-~~~~~-~~-~w~~~-~~~~~~~~
-------··~·---------
'j, ----··-------------· , .;
.~._r:U!AN UP l>KP OS I T RE FUND TO :
~\·-··----
-----·-------··---------·
TOWN OF VAIL
75 S. FRONTAGE ROAD
VAIL, CO 81657
970-479-2138
• • DEPARTMENT OF COMMU NITY DEVELOPMENT
NOTE: THIS PERM IT MUST BE POSTED ON JOBSITE AT ALL TIMES
ELECTRICAL PERMIT Permit #: E96-0135
Job Address:
Location ... :
Parcel No .. :
Project No.:
1726 BUFFEHR CREEK RD
BUFFER CREEK CHALETS # 7
2103-122-10-007
PRJ95-0194
Status ... :
Applied .. :
Issued ... :
Expires .. :
ISSUED
06/26/1996
06/26/1996
12/23/1996.
APPLICANT WAG NER ELECTRIC INC Phone: 3039496161
P.O BOX 4995, VAIL CO 81658
CONTRACTOR WAGNER ELECTRIC INC Phone: 3039496161
P.O BOX 4995, VAIL CO 81658
OWNER BUFF~HR CR EEK PARTNERS
PO BOX 305, MINTURN CO 81645
Description: COMPLETE ELECTRICAL FOR NEW RESIDENCE Valuation: 20 ,000.00
*********************************************************** FEE SUMM ARY **********************************************************
Electri cal---> 193.00 Total Calculated Fees---> 196 .00
ORB Fee ---> .OJ Addi~ional Fees---------> .00
Invest isa t i.J .l> .00 Total Permit Fee--------> 196.00
\Jill Call----> 3 .00 Payments----------------> 196.00
TOTAL FEES---> 196 .00 BALANCE DUE-------------> .00
*************"***************rl:oc**** ******H'********************* *************************************** * * * * * * * * *****************
Item: 06000 ELECTRICAL DEPARTMENT Dept: BUILDING Division:
06 /26/~996 CnARLIE Action : APPR FOR ERNST G
CONDITION OF APPROVAL
1. FIELD INS?ECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE
2. ALL \'i ORK MUST ABIDE BY THE 19 9 6 NEC
*****************************~***************************************************************************************************
DECLARATIONS
I hereby acknowledge that 1 ha ve read :his application, filled out in full the information required, completed an accurate plot
plan, and state that all t he informa·;ion provided as required is correct . I agree to comply with the information and plot plan,
to comply .1iti1 al, Tu.1:1 o ,·j ,'h:liiC~s o:'ld s•a·\e laws , and to build thi s s tructure according to the Town 's zoning and subdivision
codes, design review approved, Uniform Building Code and ot1er ordinances of the Town applicable thereto.
REQUESTS FOR lll '3 PE:TIO~ S:-.A_L 3E MA~: TIJ.:NT Y-FO UR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFIC E FROM 8:00AM 5:00 PH
._fkiuv&~
SIGNATURE OF OIJNER OR CONTRACTOR FOR HIMSELF AND OIJNER
.. . • &
*******************************************************~******
TOWN OF VAIL, COLORADO Statemnt
***********************'*****************************************
Statemnt Number: REC-0161 Amount: 196.00 06/26/96 14 :31
Init: CD Payment Method: CK Notation: #12577
Permit No :
Parcel No:
Site Address:
Location:
This Payment
~96 -0135 Type: B-ELEC
2103-122-10-007
ELECTRICAL PERMIT
1726 BUFFEHR CREEK RD
BUFFER CREEK CHALETS # 7
Total Fees:
196.00 Total ALL Pmts:
Balance:
196.00
196_.00
.00
****************************************************************
Account Code
01 0000 41313
01 0000 41336
Description
ELECTRICAL PERMIT FEES
WILL CALL INSPECTION FEE
Amount
193.00
3.00
AJ
Al"Pl.l 1;'1\'l'IUN HU~'J.' BE f J.LLED OUT CQMPLE'l'ELY OR 1'1' MAY NO 'l'
t::·~•'lr*.,.*ir'**"'~~*Hrtttt'llidr #-trn•llfr+rH.,_ l'EIU>U 'l' INFORMl\TION *,_iliff ' ;·, .
l J -nui ldin9 l ) -Pl\mb .l n q IJX)-Eletctrical [ )-Mach 11i ---~-
,rol.> N l.u 1•1:l.: ~#!!:.C-.#.J:.L./.Hfer..":7 Job Adth:e rt.e : /J."' .tJ,tlEf.C'~ .. a~.~.f&u~----
l.i~9 n J.. l)cr:H..:~· Jp \: lon: L o t:.. __ ~···· . Ul ocr._ •. _...,._ F i li ll'J ___ ...... ~U.lrl/.1 'US BJ.!j_; _____ .... _ --·--
'··-~lH'J:r> ~~~1 n o: &LulJ&.CLt.ee~-~~IVJ.u:r.t:r;s: .&r~~-.. ~~~~/"Y'~_ .. __ Fh.~-~~ -3z_tz
1\J.:c:d .l:c ·.;t: ___ ........... --....... _._ ...... , ..• ~ ..... ------· J\u ctrosa: ........ ~.~~----.. ----·· ... -···--····--------Ph.·-----..
r..;-g n.-~x:n J. Ll'!f;C l •. t.pU on: .. -~···~ .. ··~·~-------~-.:!_.~~~-~~-·--·
l .urK l:l cu a;: f)(,J··Uow ( )-1\l t .cn·atiml )-1\ddith>n~l. [ )-Repair [ J-Othe t·--~···-··
l lr.utll.'e r oc vweJ.J .tllC.J un J.tr.: __ j __ H ~llrJ;H~r of J\cconun¢dation Untta :
•
a .. l]llil l.;C l: CJ1n.i ·ry pe 01 l .. ir·'=lpl n •.!l:t!:'l: GaG J\J;.•pl!Ance s ___ Gus Loge: Wood/P ellet
., ~ -pei'qs -c 19'( -·
11' ~ ~. i'"' ~ ,, 4,-~. * ",,"',:, *.~f.~.,..,,.,,*~~ 1>c "'* * * '' "•"'"' VAJ,'UA'riONS "' ... "' • .a. • •" * * w •" "'• •-~< -~t 11 * • ..rr •In\ *., * ••• • ,. "1 E.9Ul-Or?>S . ~UJ LJJ H iG : -~-P.:J..l:ECTRI CAL ; '·.k.e 4?t2 .~ OTJIER: $
l)JJll~U,lN~: 1 l1EC 11hNlCAL! $ TOTA L : ~ .. ~_.
~., .. __________ ... .-~ ... --.. ··--· ···--·-·---·-
j./(.;, M ~. ff"' i.,., ...... .;, ** * *~ tf #r ~ "'~ * ... ''" * w td GONTMC'l'O R ltl .FORMJ\'l'ION • *"' lir'lt'lt* *""****"'. ,.. ...... tt•'itttl'l ~ ~r~mn·t\ l C:\.m i.T <:,c l:(J r: l!:~liiJ _(tr.j_~f:N<..·"b.~t:J. ___ 'l'own of Vail ne9. NO.
i\tl ,JroaFl: --~_iM2 .. BJuJ/L'I ._C:L . _________ ,M ·-l'huno N'Ulnl>o rt -l..'IL:...li:i:i.-__ _
Elr:·d:di.'lll cmaVt:tH.:t <.H:I tJ(g_4t!'JiX . ..£/aw~. #k '!'own of vail :R ag. lw .z;Z3·--F
r.cJ<i ~c s s t _,tlfJ1...i.Ja,Q.;.~e1 ~tL---------~---·-l'hon~ Nunlber: :~££..~L-
l'l11 111l> :II HJ l~(Jilt'.U\Ctor. t
l>.cl<l r o::.s: ----------------··---· ·-
J·le L:hn ni t~Hl <..:(.:mtt:a ct.ot·:
hrt d re o t~: ....... --···-----··" .... ___ . ____ ......._
'rown of' Vail Ra9 . No . __ _
Phone Numbe r: ___ -------
··~,1 ~h*~~•~~~·~~~~~**••~~***~*~~ fUR OFFICE USE *•***"~~~•••••~****'~~**~•••••**~•-
L'U !LI'>IJW Pt:RJHT FBF.: __ ·---·--nur!.DIN G PLT\N Cl tJ~CK FP:E ~
I'U ~f.Wl2JG PEIU.H'l' l<~ln:! -·~-----... __ ~ PJ..l.Jt10IHO VIJ\~1 CHECK F£F.:
J.lF.:CJIANl CI\L P E1HH 'J.' Flm : ···----MECIIhN'I<:M .. l'Lltt~ CIIY.C I< F'Rir.:
FLt:C'l'RlC''JH .. J~r.E: ltE<:ltEA'riON .F EE: ...... ,...~ ... --
OT HER 'l'YPE OF FEE: CLl!AN-UP DEPOSIT:
r·~~:~~~;~~~[::J:--.. ~~~~~:~-~-~ ~giiii~::R~~ pj --l~~
CultllltOt'l if;: .............. 4 __ ....... , .... ~ .-·--··· -·-------.. ------·4 ...... _. ___ .. ____ " ______ ., .. ___ ... __ --...,_, .. -· ----·--
, ___ . . .. ·-·--·--·· .. ·-·------·----------·· ... ---......----·--· -~-----
... 4: ··-·· ~-·-... ···--· .. ·-· -..J .. ~ ... -..,--_ ... _.._,. .. ,_ ... ...._ ..... _.. ...... --...... ·~··.,._ ... _ ··-------··--· ... -·, ---···.--,.-,.~·----f _ .... ___ _
f\.;1.11,!' tj _ UP H&PU~H:.ltY.Jfill!Q. J.~..!.
TOWN OF V ~DEPARTMENT OF COMMUNITY D~LOPMENT
~irfu~
97 -
75 South Frontage Road Departm ent of Community Development
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES Vail, Colorado 81657
970-479-2138/479-2139
FAX 970-479-2452 PLUMBING PERMIT Permit #: P96-0032
APPLICANT
CONTRACTOR
OWNER
Job Address:
Location ... :
Parcel No .. :
Project No.:
1726 BUFFEHR CREEK RD
BUFFER CREEK CHALETS # 7
2103-122-10-007
PRJ95-0194
Status ... :
Applied .. :
Issued ... :
Expires .. :
ISSUED
04/23/1996
04/23/1996
10/20/1996
SNOW COUNTRY SERVICES Phone: 3039267575
P 0 BOX 157, AVON CO 81620
SNOW COUNTRY SERVICES Phone: 3039267575
P 0 BOX 157, AVON CO 81620
BUFFEHR CREEK PARTNERS
PO BOX 305 1 MINTURN CO 81645
Description: PLUMBING FOR NEW SFR Valuation: 21,200.00
***************************~************************* FEE SUMMAR Y **********************************************************
Plumbing -----> 330.00 Restuarant Plan Re v iew--> .00 Total Calculated Fee s---> 415.50
Plan Check---> 82.50 TOTAL FEES--------------> 415.50 Additional Fees---------> .00
Investigation> .00 Total Permit Fee --------> 415.50
Will Call ----> 3 .00 Pa yments----------------> 415.50
BALA NC E DUE----------> .00
**********************'***********************************************************************************************************
Item: 05100 BUILDING DEPARTMENT Dept: BUILDING Division:
04/23/1996 CHARLIE Action:-APPR CHARLIE DAVIS
**********************************************************************************************************************************
CONDITION OF APPROVAL
U A A A AU A***** AlUlA H AHA A A A A A A******************* H A A A A A************* A A A AHA U A AHA A UA A******** HA A A AU A AU************* AU AU A
DECLARATIONS
I hereby acknowledge that I ha ve read this application, filled out in full the information required, completed an accurate plot
plan, and state that all the information provided as requ i red is correct. I agree to compl y with the information and plot plan ,
to co mply with all Town ordinances and state laws, and to build this s tructure acco rdi ng to the Town's zoning and subdivision
code s , design ·review approved, Uniform Building Code and other ordinances of the Town appli cable thereto .
REQUESTS FOR INSPECTIONS SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FROM 8:00 AM 5:00 PM
c-:zA::;;?oTiNER OR CO NTRACTOR FOR~EC'f'"'iiN~
0 REC YCL ED PAPER
to comply w
codes, desi
di ences and stJIIIIlws, and to build this structure according ~e Town's zoning and subdivision
ov , Uniform Building Code and other ordinances of the Town ap ~le thereto .
--........,;::~'/i,ll ~ L BE HADE T\IENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2138 OR AT OUR OFFICE FR OM 8 :00 AH 5:00 PM
SIGNATURE OF 0\INER OR CONTRACTOR FOR HIMSELF AND O....,...,_~~-.-...~::::=:::;------""T"r;...-;:;-;:-r.=MT=I'-r-:=w. 75 South Frontage Road ommunity Developme nt
Vail, Colorado 81657
970-479-2138/479-2139
FAX 970-479-2452
0 RECYCLEDPAPER
• • DEPARTMENT OF COMMUNITY DEVELOPMENT
Department of Community Development
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
MECHANICAL PERMIT Permit #: M96-0027
Job Address ... : 1726 BUFFEHR CREEK RD
Location ...... : BUFFER CREEK CHALETS# 7
Parcel No ..... : 2103-122-10-007
Project Number: PRJ95-0194
Status ... : ISSUED
Applied .. : 04/23/1996
Issued ... : 04/23/1996
Expires .. : 10/20/1996
APPLICANT SNOW COUNTRY SERVICES Phone: 3039267575
P 0 BOX 157, AVON CO 81620
CONTRACTOR SNOW COUNTRY SERVICES Phone: 3039267575
P 0 BOX 157, AVON CO 81620
OWNER BUFFEHR CREEK PARTNERS
PO BOX 305, MINTURN CO 81645
Description: Valuation: 23,400.00
MECH. FOR NEW RESIDENTIAL
Fireplace Information : Restricted: Y #Of Gas Appliances : #Of Gas Logs: 2 #Of Wood/Pallet:
*********************************************************** FEE SUMMARY **********************************************************
Mechanical---> 480 .00 Restuarant Plan Review--> .00 Total Calculated Fees---> 603.00
Plan Check---> 120.00 ORB Fee-----------------> .00 Additional Fees---------> .00
Investigation> .00 TOTAL FEES--------------> 603.00 Total Permit Fee--------> 603.00
Will Call----> 3 .00 Payments----------------> 603.00
BALANCE DUE-------------> . 00
**********************************************************************************************************************************
Item: 05100 BUILDING DEPARTMENT Dept: BUILDING Division:
04/23/1996 CHARLIE Action: APPR CHARLIE DAVIS
CONDITION OF APPROVAL
1. FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
2. COMBUSTION AIR IS REQUIRED PER SEC. 607 OF THE 1991 UMC.
3. INSTALLATION MUST CONFORM TO MANUFACTURES INSTRUCTIONS AND
TO APPENDIX CHAPTER 21 OF THE 1991 UMC.
4. GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 9 AND
SHALL TERMINATE AS SPECIFIED IN SEC.906 OF THE 1991 UMC.
5. ACCESS TO HEATING EQUIPMENT MUST COMPLY WITH SEC.505 AND
703 OF THE 1991 UMC.
6. BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST.
UNLESS LISTED FOR MOUNTING ON COMBUSTIBLE FLOORING.
7. PERMITLPLANS AND CODE ANALYSIS MIUST BE POSTED IN MECHANICAL
ROOM PKIOR TO AN INSPECTION RE8UEST.
8. DRAINAGE OF MECHANICAL ROOMS C NTAINING HEATING OR HOT-WATER
SUPPLY BOILERS SHALL BE EQUIPPED WITH A FLOOR DRAIN PER SEC.
2119 OF THE 1991 UMC.
********************************************************************************
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state that all the information provided as required is correct . I agree to comply with the infor~tion and plot plan,
0 R ECYCLEDPAPER
.
*~C o n ta c t Eag l e County As se ss ~f fice •
<..t 9 70-3 2 8-8640 f.Q t.__F ~<j~!. ~ TOWN OF VAIL CONSTRUCT! t
B 9 .5 --a s I ~
PER}liT II
PARCE L #: 2-(a •s-!'-. ·( c..o 1> PERMIT APP{tCATION FORM
DATE: -Zz -f~
'PeD-<1' 5-Q I ~ cj --
tl APPLICATION MUST BE FILLED OUT COMPLETELY OR IT MAY NOT BE ACCEPTED
~***************************** PERMIT INFORMATION *****************************
[ J -Building I><J -Plumbing ( -Electrical [?1.:-Mechanfcal [ ] -Other ___ _
Job Name: ~Jv-(j(. cYy _ _k_l Job Address: /72C:. -~· \-P ...... .a.....;...v-____,.(_· ....... ('--;;......_ ___ _
Legal Description: Lot~ Block Filing _____ ~S~U~BD~I~V~I~S~I~O~N~: ______________ _
nM !J --~(~:P-/-1
Owners Name: prgv-CY<-, (J~v tvvv/ Address: -------------------------Ph. _______ _
Architect: Address: -----------------------Ph. ________ _
Gener"il Oeser iption: ______,2-. ·> (' <Q,_ ex t <I e ('~~9-.ltL...-..s...l-i....~..-.-______________________________ _
~/
Work Class: )-New ( )-Alteration ( )-Additional [ )-Repair [ )-Other _____ _
Number of Dwelling Units: Number of Accommodation Units:
*
mber and Type of Fireplaces: Gas Appliances ___ Gas Logs ~ Wood/Pellet
******************{************* VALUATIONS ********************************* P'frb-o o ~+-fV\ q C:>-e o;;.... 7
BUILDING: $ ELECTRICAL:$ OTHER:$
PLUMBING: $ Z / ~-· MECHANICAL:$ Z 3 $ L TOTAL:$,..---------·
'tl* * * * * * *** *** **~ *****.* * * * * ** CONTpC!:.OR INFORMATION *** ** ** ******** *** *** ****** /t~neral Contractor : ~_c., G.n.at. :...L~-Town of Vail Reg. NO. P
·. Address: Phone Number: ..:....------
Electrical Contr actor : Town of Vail Reg. NO. _____ _
Address: Phone Number: --·----------
P lumbing Con ractor: -~-u_~, _L,rs.z,.J,., ~ ..._~
Address : _> l<. /2 "7 -~ (£_) ~i./.£7,.,.,_
Town of Vail Reg. NO.~_L_
Phone Number: -~-=-2i..2 ~
Mechanical Contractor: 5c ~r C~)
Address: v ~---Town of Va i l Reg. NO.
Phone Number: -----
********************************
BUILDING PERMIT FEE :
PLUMBING PERM I T FEE:
MECHANICAL PERMIT FEE:
ELECTRICAL FEE:
OTHER TYPE OF FEE:
DRB FEE:
TYPE GROUP SQ. FT. VALUATION
---------
FOR OFFICE USE *******************************
BUILDING PLAN CHECK FEE:
PLUMBING PLAN CHECK YEE:
MECHANICAL PLAN CHECK FEE:
RECREATION FEE:
CLEAN-UP DEPOSIT:
TOTAL PERMIT FEES:
BUILDING:
SIGNATURE:
ZONING: ·-SIGNATURE: Comments: ________________________________________________________________________ _
XCLEAB UP DEPOSIT REFIJND TO:
BUFFEHR CREEK LOT 7 SNOW COUNTRY SERVICES HEATLOSS SUMMARY-WIRSB
O
IN
G
Y
P
C
R
E
T
E
ZONE ROOM
S
Q
BT
U
BT
U
NO
.
o.
c
.
TU
B
E
S
/
L
O
O
P
T
O
T
A
L
SU
P
P
L
Y
G
P
M
F
f
F
L
O
O
R
CO
V
E
R
I
N
G
F
T
H
E
A
T
P
E
R
LO
O
P
S
(I
N
)
J
O
I
S
T
LG
T
H
S
F
T
O
F
W
A
T
E
R
HE
A
D
T
Y
P
E
US
E
D
LO
S
S
S
Q
F
T
SP
A
C
E
(F
T
)
TU
B
E
T
E
M
P
1 BUNK ROOM
35
7
95
6
0
27
---
-
-
10
SL
A
B
--
-
-
-
0
14
9
--
-
--
-
-
HE
A
V
Y
CA
R
P
E
T
/
P
A
D
1 STUDY/STAIRS
31
2
77
7
0
25
4
10
SL
A
B
25
0
10
0
0
14
9
2
.7
4.
6
HE
A
V
Y
CA
R
P
E
T
/
P
A
D
2 SITTING
25
6
10
3
0
Q
40
--
-
6
GY
P
--
-
-
-
0
15
0
-
·--
--
-
-
HE
A
V
Y
CA
R
P
E
T
/
P
A
D
2 DINING/KITCHEN
41
1
82
4
0
20
5
10
GY
P
25
0
12
5
0
15
0
2
.7
3
.
1
WO
O
D
• 3 LIVING
34
8
17
0
0
0
49
--
-
6
GY
P
-
·--
-
0
15
0
--
-
--
-
WO
O
D
3 FOYER/HALL
31
3
12
1
0
0
39
--
-
-
8
GY
P
-
--
0
15
0
--
-
--
-
-
ST
O
N
E
3 POWDER
25
29
3
12
--
-
--·-
12
GY
P
--
·--
-
-
0
15
0
--
-
-
--
-
-
ST
O
N
E
3 MUDROOM
65
86
2
13
5
12
GY
P
25
0
12
5
0
15
0
3
.5
4
.8
ST
O
N
E
4 GARAGE
46
1
94
1
0
20
2
12
SL
A
B
25
0
50
0
10
9
1.
3
4
.4
SL
A
B
5 MSTRBEDROOM
25
5
10
0
0
0
39
3
6
GY
P
20
0
60
0
15
0
0
.9
0
.8
HE
A
V
Y
CA
R
P
E
T
/
P
A
D
6 MSTRBATII
13
4
44
5
0
33
--
-
-
12
GY
P
···-
-
-
·-
0
13
6
--
-
-
-
-
-
TI
L
E
6 MSTRCLOSET
58
61
5
11
1
12
GY
P
25
0
25
0
13
6
0
.6
3.
8
HE
A
V
Y
CA
R
P
E
T
/
P
A
D
7 BEDROOM304
17
0
32
0
0
19
····-
-
12
GY
P
--
-
--·--
0
13
9
--
-
-
-
···-
-
-
HE
A
V
Y
CA
R
P
E
T
/
P
A
D
7 BATII305
47
16
4
0
35
--
-
-
-
12
GY
P
..
.
.
.
.
.
.
.
.
...
...
0
13
9
--
-
-
--
-
-
TI
L
E
7 UPPER HALL
21
2
24
3
0
11
-·--
-
12
GY
P
--
-
-
-
0
13
9
--
-
--
HE
A
V
Y
CA
R
P
E
T
/
P
A
D
7 LAUNDRY
47
53
8
l
l
2
12
GY
P
25
0
50
0
13
9
1.
2
3.
9
TI
L
E
8 BEDROOM307
23
8
56
6
0
24
-
~
12
GY
P
--
-
-
--
~~
14
8
--
-
-
--
-
-
HE
A
V
Y
CA
R
P
E
T
/
P
A
D
8 BATII308
44
93
8
21
12
GY
P
2
0
0
14
8
0
.8
1.
5
TI
L
E
9% BATII312
44
71
5
16
-
---
12
GY
P
--
-
-
-
0
14
5
··---
--
-
-
-
TI
L
E
9 1(" BEDROOM 310
24
4
60
5
0
25
2
10
GY
P
20
0
40
0
14
5
0
.8
1.
6
HE
A
V
Y
CA
R
P
E
T
/
P
A
D
TOTALS
40
4
1
11
1
7
7
1
28
~
TO
T
A
L
-M
5
6
'
15
0
14
.
5
4.
8
~
'
Z
-
(
o
h
i
SO
1. GAS OR WOOD FIREPLACES WI
T
I
I
O
U
T
SE
A
L
E
D
DO
O
R
S
MA
Y
AD
V
E
R
S
E
L
Y
AF
F
E
C
T
TH
E
PE
R
F
O
R
M
A
N
C
E
O
F
RA
D
I
A
N
T
FL
O
O
R
SY
S
T
E
M
S
.
2. IF TWO DIMENSIONS APPEAR
IN
TH
E
"O
C
(I
N
)
"
CO
L
U
M
N
,
IN
S
T
A
L
L
50
%
OF
FL
O
O
R
AR
E
A
O
N
ON
E
DI
M
E
N
S
I
O
N
AN
D
TH
E
OT
H
E
R
50
%
ON
TH
E
OTHER DIMENSION. THE CLO
S
E
R
TU
B
E
SP
A
C
I
N
G
SH
O
U
L
D
BE
DO
N
E
CL
O
S
E
S
T
TO
EX
T
E
R
I
O
R
GL
A
Z
E
D
WA
L
L
S
.
SUPPLEMENTAL HEAT TO
TA
L
L
I
N
G
30
0
0
BT
U
H
IS
RE
Q
U
I
R
E
D
IN
TH
E
MA
S
T
E
R
BE
DRO
O
M.
l
ow
no
f
Va
U
~F
I
C
E
C
OP
Y
• BUFFEHR. CREEK LOT 7 FLOOR COVERING TYPES. RA
D
I
A
N
T
CO
N
S
T
R
U
C
T
I
O
N
TY
P
E
AN
D
"
R
"
VA
L
I
J
E
S
HA
V
E
BE
E
N
AS
S
U
M
E
D
IF
NO
T
SH
O
W
N
ON
TH
E
PR
I
N
T
S
.
PLEASE USE TWS SHEET TO CO
R
R
E
C
T
AN
Y
AS
S
U
M
P
T
I
O
N
S
MA
D
E
TB
A
T
AR
E
IN
C
O
R
R
E
C
T
.
ZONE ROOM
FL
O
O
R
CO
V
E
R
I
N
G
CH
A
N
G
E
F
L
O
O
R
C
O
V
E
R
I
N
G
SO
U
R
C
E
O
F
R
"
V
A
L
U
E
C
H
A
N
G
E
"
R
"
T
C
TY
P
E
US
E
D
TY
P
E
TO
:
(L
I
S
T
CH
A
N
G
E
S
)
HE
A
T
L
O
S
S
US
E
D
{L
I
S
T
CH
A
N
G
E
S
)
1 BUNK ROOM
HE
A
V
Y
CA
R
P
E
T
/
P
A
D
WA
L
L
S
20
1 STUDY/STAIRS
HE
A
V
Y
CA
R
P
E
T
/
P
A
D
...
.
.
CE
U
.
.
I
N
G
40
2 SITTING
HE
A
V
Y
CA
R
P
E
T
/
P
A
D
GL
A
S
S
2
2 DINING/KITCHEN
WO
O
D
SK
Y
L
I
G
H
T
S
NA
3 LIVING
WO
O
D
DO
O
R
S
3.
5
3 FOYER/HALL
ST
O
N
E
FL
O
O
R
S
19
3 POWDER
ST
O
N
E
UN
D
E
R
SL
A
B
0
3 MUDROOM
ST
O
N
E
SL
A
B
ED
G
E
0
4 GARAGE
SL
A
B
FO
U
N
D
A
T
I
O
N
WA
L
L
0
5 MSTR BEDROOM
HE
A
V
Y
CA
R
P
E
T
/
P
A
D
AI
R
CH
A
N
G
E
I
H
R
0.
5
6 MSTRBATII
TI
L
E
%
G
L
Y
C
O
L
0
6 MSTRCLOSET
HE
A
V
Y
CA
R
P
E
T
/
P
A
D
IN
S
I
D
E
DE
S
I
G
N
TE
M
P
68
7 BEDROOM304
HE
A
V
Y
CA
R
P
E
T
/
P
A
D
OU
T
S
I
D
E
DE
S
I
G
N
TE
M
P
-2
5
7 BATI-1305
TI
L
E
7 UPPER HALL
HE
A
V
Y
CA
R
P
E
T
/
P
A
D
7 LAUNDRY
TI
L
E
8 BEDROOM307
HE
A
V
Y
CA
R
P
E
T
/
P
A
D
8 BATH308
TI
L
E
8 BATI-1312
TI
L
E
8 BEDROOM310
HE
A
V
Y
CA
R
P
E
T
/
P
A
D
.BE RADIANT FLOOR INSTAL
L
A
T
I
O
N
TY
P
E
IS
AC
T
U
A
L
L
Y
(C
I
R
C
L
E
ON
E
)
:
1 TUBING STAPLED UNDER
SU
B
F
L
O
O
R
2 TUBING IN CONCRETE SL
A
B
3 TUBING IN GYPCRETE WI
T
I
I
FI
N
I
S
H
E
D
FL
O
O
R
DI
R
E
C
T
L
Y
OV
E
R
GY
P
C
R
E
T
E
4 TUBING IN GYPCRETE WI
T
I
I
_
"
SU
B
F
L
O
O
R
DI
R
E
C
T
L
Y
OV
E
R
GY
P
C
R
E
T
E
IS mERE ANY PLANS TO INST
A
L
L
AN
AI
R
-
T
O
-
A
I
R
HE
A
T
EX
C
H
A
N
G
E
R
?
?
Y
N
IS THERE ANY PLANS TO INST
A
L
L
AN
Y
EX
H
A
U
S
T
SY
S
T
E
M
OT
H
E
R
TH
A
N
BA
T
H
R
O
O
M
FA
N
S
O
R
RA
N
G
E
HO
O
D
?
?
Y
N
' •
' ;S
(\
h
N
~ x-~
~
~ (\J
~
~ ~ " V> \..]\ c
N
....,) ,'(
f
~
~
~ ~
,...
w N N
:! ,\J". /.
~ N
....
"
~ '
V'V w
1
-...
~ .. r s-
t
i :
~ r
--r~
-~--~---~-~A -~--~-~
r--~~~tl"::r
-~ I
I
I .
L--
• • Heat Loss Analysis Report
WIRSBO Radiant Panel Heating System
Project#: 004
Date: 7110196
Prepared By
COLORADO PLUMBING SERVICE , INC
45705 HWY. 6 & 24
GLENWOOD SPRINGS, COLORADO 81601
Project Information
Name: BUFFEHR CK. LOT 7
Location: VAIL
Closing Date :
Project Summary
Total Heat Loss:
Upward :
Downward:
Supplemental :
Net:
Detailed Heat Loss Data
Room: BATH 1
Gross Area :
Unheated Area:
Net Heated Area:
Ceiling Height:
Volume:
Air Changes:
Room Temp:
66,969 Btu/Hr
6 ,830 Btu/Hr
0 Btu/Hr
73,799 Btu/Hr
40 ft 2
0 ft 2
40 ft 2
8ft
320 ft3
0 .50 per Hour
65 OF
Floor Component
Floor Type: Slab On Grade
Temp Below:
Floor Cover Rv:
Under Slab Rv:
Edge Rv:
Perimeter Rv:
Ceiling Component
Space Above Heated :
Net Ceiling Area:
Rv:
Room Components
40 °F
0 .00
5 .00
5 .00
5.00
No
40 ft2
35.00
Phone #: (970) 945-9809
Fax#: (970) 945-0723
By : JACK SILLS
Owner: ZEEB CONST.
Engineer:
Total Area :
Outdoor Temp:
Room Infiltration:
Total Heat Loss:
Upward:
Downward:
Supplemental :
Net:
Unit/Net:
Slab Depth :
Water Table Present:
Space Below Heated :
Downward Heat Loss:
Unit Heat Loss:
Floor Surface Temp:
Heat Loss :
(less sub components if any)
Component I Length I I Height (ft) I Area (ft2) I
Width (ft)
Rv
Wall1 L 8 I 8 , ~ _j 20.00
Page 1
290 Btu/hr
703 Btulhr
459 Btu/hr
0 Btu/hr
1,162 Btu/hr
29 Btu/hr/ft2
4inches
No
N/A
459 Btu/hr
11 Btu/hr/ft2
73 °F
109 Btu/hr
I
Heat Loss
(Btu/hr)
I 304 -
•
Room: BATHS 2 & 3
Gross Area :
Unheated Area:
Net Heated Area :
Ceiling Height:
Volume:
Air Changes:
Room Temp:
Floor Component
Floor Type:
Temp Below:
Floor Cover Rv:
Floor Insulation Rv:
Edge Rv:
Peri meter Rv:
Ceiling Component
Space Above Heated:
Net Cei li ng Area :
Rv:
80 ft2
0 ft2
80 ft2
8ft
640 ft3
0 .50 per Hour
65 °F
Suspended
65 OF
0.50
5.00
N/A
N/A
Yes
80 ft2
35.00
• WIRSBO Radiant Panel Heating System
Room Infiltration:
Total Heat Loss:
Upward:
Downward:
Supplemental :
Net:
UniUNet:
Slab Depth :
Water Table Present:
Space Below Heated:
Downward Heat Loss:
Unit Heat Loss :
Floor Surface Temp:
Heat Loss:
Project #: 004
Date: 7110196
581 Btu/hr
885 Btu/hr
147 Btu/hr
0 Btu/hr
1 ,032 Btu/hr
13 Btu/hr/ft2
N/A
N/A
Same Source
147 Btu/hr
1 Btu/hr/ft2
70 OF
0 Btu/hr
(less sub components if any)
Room Components
Component Length I I Height (ft) I Area (ft2
) 1
Width (ft)
Rv Heat Loss
(Btulhr)
Wall1
Room: BED#1
Gross Area :
Unheated Area:
Net Heated Area:
Ceili ng Height:
Volume:
Air Changes:
Room Temp:
Floor Component
Floor Type:
Temp Below:
Floor Cover Rv:
Floor Insulation Rv :
Edge Rv:
Peri meter Rv:
Ceiling Component
Space Above Heated :
Net Ceiling Area :
Rv:
Room Components
Component
Wall1
8 .J 8 I 64 l 20.00
225fF
0 ft2
225 ft2
8ft
1,800 ft3
0 .50 per Hour
65 °F
Suspended
65 °F
0 .50
5 .00
N/A
N/A
Room Infiltration:
Total Heat Loss:
Upward :
Downward:
Supplemental:
Net:
UniUNet:
Slab Depth:
Water T able Present:
Space Below Heated :
Downward Heat Loss :
Unit Heat Loss :
Floor Surface Temp:
Heat Loss:
304
1,633 Btu/hr
4 ,597 Btu/hr
750 Btu/hr
0 Btu/hr
5 ,347 Btu/hr
24 Btu/hr/ft2
N/A
N/A
Same Source
750 Btu/hr
3 Btu/hr/ft2
75 OF
0 Btu/hr Yes
225 ft2
35.00
(less sub components if any)
Length I
Width (ft)
15
Height (ft)
8
Page 2
Area (ft2) Rv
120 20.00
Heat Loss
(Btulhr)
304
• • WIRSBO Radiant Panel Heating System
Project #: 004
Date: 7110196
I_ Window_1_---'-__ 1_4 _ __,_ __ 4 __ ...__ _ _:_56-'----L... 2.00 2 ,660
Room: BED#2
Gross Area:
Unheated Area :
Net Heated Area :
Ceiling Height:
Volume:
A ir Changes:
Room Temp:
Floor Component
Floor Type:
Temp Below:
Floor Cover Rv:
Floor Insulation Rv:
Edge Rv:
Perimeter Rv:
Ceiling Component
Space Above Heated :
Net Ceiling Area :
Rv:
Room Components
Component
Wall1
210 ft2
0 ft2
210 ft2
8ft
1,680 w
0 .50 per Hour
65 °F
Suspended
65 °F
0 .50
5 .00
N/A
N/A
Room Infiltration:
Total Heat Loss:
Upward :
Downward:
Supplemental :
Net:
UniUNet:
Slab Depth:
Water Table Present:
Space Below Heated :
Downward Heat Loss:
Unit Heat Loss:
Floor Surface Temp:
Heat Loss :
1 ,524 Btu/hr
5,581 Btu/hr
945 Btu/hr
0 Btu/hr
6 ,526 Btu/hr
31 Btu/hr/ft2
N/A
N/A
Same Source
945 Btu/hr
4 Btulhr/ft2
78 °F
0 Btu/hr Yes
210 ft2
35 .00
(less sub components if any)
Length I Height (ft) Area (ft2 ) J
Width (ft)
Rv Heat Loss
(Btu/hr)
Window1
20 .00 732
2_.0_0_ ~.._~--_~3,325 -
2a L a 22£____J_
__L_ 14 _1_ --=s=-----1'------10 __L
Room : DINING & KIT.
Gross Area:
Unheated Area :
Net Heated Area :
Ceiling Height:
Volume:
Air Changes :
Room Temp:
Floor Component
Floor Type:
Temp Below:
Floor Cover Rv:
Floor Insulation Rv:
Edge Rv:
Perimeter Rv:
Ceiling Component
Space Above Heated :
Net Ceiling Area:
Rv:
Room Components
680 ft2
Oft2
680 ft2
10ft
6 ,800 ft3
0 .50 per Hour
65 °F
Suspended
65 OF
0 .50
5 .00
N/A
N/A
Yes
680 ft2
35 .00
Page 3
Room Infiltration :
Total Heat Loss:
Upward:
Downward :
Supplemental :
Net:
UniVNet:
Slab Depth :
Water Table Present:
Space Below Heated:
Downward Heat Loss:
Un it Heat Loss:
Floor Surface Temp:
Heat Loss:
6,169 Btu/hr
11 , 133 Btu/hr
1,813 Btu/hr
0 Btu/hr
12 ,946 Btu/hr
19 Btu/hr/ft2
N/A
N/A
Same Source
1 ,813 Btu/hr
2 Btu/hr/ft2
73 OF
0 Btu/hr
(less sub components if any)
•
Component Length I I Height (ft)
Width (ft)
• WIRSBO Radiant Panel Heating System
Area (ft2 ) Rv
Project #: 004
Date: 7110196
Heat Loss
(Btu/hr)
f-Wall1 50 tl 400 _ 20.00 1,449
Door1 _5 _ 7 -1--~ 5.00 665
Window1 -1--10 ___ 6 __ c.__ 60 l-,_2 .QQ_ __ 2 ,850
Room : GARAGE
Gross Area:
Unheated Area:
Net Heated Area :
Ceiling Height:
Volume:
Air Changes:
Room Temp:
596 fF
0 ft2
596 ft2
8ft
4 ,768 ft3
0 .50 per Hour
55 OF
Floor Component
Floor Type: Slab On Grade
Temp Below:
Floor Cover Rv:
Under Slab Rv:
Edge Rv:
Perimeter Rv :
Ceiling Component
Space Above Heated :
Net Ceiling A rea:
Rv:
Room Components
Component
Wall1
40 °F
0 .00
5 .00
5 .00
5.00
Yes
596 ft2
35.00
Length I I Height (ft)
Width (ft)
44 t-~ -I-
Door1 12
Room : LIVING
Gross Area :
Unheated Area :
Net Heated Area:
Ceiling Height:
Volume:
Air Changes:
Room Temp:
Floor Component
Floor Type:
Temp Below:
Floor Cover Rv :
Floor Insulation Rv:
Edge Rv:
Perimeter Rv:
Ceiling Component
Space Above Heated :
340 ft2
0 ft2
340 ft2
10ft
3,400 ft3
0 .50 per Hour
70 °F
Suspended
65 °F
0 .50
5 .00
N/A
NIA
Yes
Page4
Room Infiltration:
Total Heat Loss:
Upward :
Downward:
Supplemental:
Net:
Unit/Net:
Slab Depth :
Water Table Present:
Space Below Heated :
Downward Heat Loss :
Unit Heat Loss :
Floor Surface Temp:
Heat Loss :
3,870 Btu/hr
6,590 Btu/hr
3,335 Btu/hr
0 Btu/hr
9,925 Btu/hr
17 Btulhr/ft2
4inches
No
N/A
3,335 Btu/hr
5 Btu/hr/ft2
60 °F
0 Btulhr
(less sub components if any)
Area (ft2
) 1 Rv
352 + 20.00
96 5 .00 --~
Room Infiltration:
Total Heat Loss :
Upward :
Downward :
Supplemental:
Net:
Unit/Net:
Slab Depth :
Water Table Present:
Space Below Heated:
Downward Heat Loss:
Unit Heat Loss :
Floor Surface Temp:
Heat Loss :
I
I
Heat Loss
(Btu/hr)
1,088
1,632
3,247 Btu/hr
7,212 Btu/hr
1,473 Btu/hr
0 Btu/hr
8,685 Btu/hr
26 Btu/hr/ft2
N/A
N/A
Same Source
1,473 Btu/hr
4 Btu/hr/ft2
80 OF
0 Btulhr
• • WIRSBO Radiant Panel Heating System
Net Ceiling Area :
Rv:
Room Components
Component
340 ft2
35 .00
Length I 1 Height (ft) I
Width (ft)
(less sub components if any)
Area (ft2 ) Rv
Wall1 ~1 j 8 l 328 20.00 --
Door1 7 5 .00 -35 -
Window1 5 40 2.00 ---
Room : LOWER HALL
Gross Area:
Unheated Area :
Net Heated Area :
Ceiling Height:
Volume:
Air Changes:
Room Temp:
128 ft2
0 ft2
128 ft2
8ft
1,024 ft3
0 .50 per Hour
65 °F
Floor Component
Floor Type: Slab On Grade
Temp Below:
Floor Cover Rv:
Under Slab Rv:
Edge Rv :
Perimeter Rv:
Ceiling Component
Space Above Heated:
Net Ceiling Area:
Rv:
Room Components
40 OF
0 .00
5 .00
5 .00
5 .00
No
128 ft2
35.00
Component Length I I Height (ft) I
Width (ft)
N/A 0 0
Room : LOWER LIV.
Gross Area:
Unheated Area :
Net Heated Area :
Ceiling Height:
Volume :
Air Changes:
Room Temp:
Floor Component
Floor Type:
Temp Below:
Floor Cover Rv:
Under Slab Rv:
Edge Rv:
Perimeter Rv:
320 ft2
0 ft2
320 ft2
8ft
2 ,560 ft3
0 .50 per Hour
65 °F
Slab On Grade
40 OF
0 .00
5.00
5.00
5 .00
Page 5
:
Room Infiltration:
Total Heat Loss :
Upwa rd :
Downward :
Supplemental:
Net:
UniUNet:
Slab Depth:
Water Table Present:
Space Below Heated:
Downward Heat Loss:
Un it Heat Loss:
Floor Surface Temp:
Heat Loss:
(less sub components if any)
Area (ft2 )
I
Rv
0 I 0.00
Room Infiltration:
Total Heat Loss :
Upward :
Downward :
Supplemental:
Net:
UniUNet:
Slab Depth :
Water Table Present:
Space Below Heated :
Downward Heat Loss:
Unit Heat Loss :
Floor Surface Temp :
I
I
I
Project #: 004
Date: 7110196
Heat Loss
(Btu/hr)
1,265
700
2 ,000
929 Btu/hr
1,276 Btu/hr
640 Btu/hr
0 Btu/hr
1,916 Btu/hr
15 Btu/hr/ft2
4 inches
No
N/A
640 Btu/hr
5 Btu/hr/ft2
69 OF
347 Btu/hr
Heat Loss
(Btu/hr)
0
2 ,323 Btu/hr
5 ,890 Btu/hr
2 ,396 Btu/hr
0 Btu/hr
8 ,286 Btu/hr
26 Btu/hr/ft2
4inches
No
N/A
2 ,396 Btu/hr
7 Btu/hr/ft2
74 OF
•
Ceiling Component
Space Above Heated :
Net Ceiling Area :
Rv:
Room Components
No
320 ft2
35 .00
• WIRSBO Radiant Panel Heating System
Heat Loss :
(less sub components if any)
Project #: 004
Date: 7110196
869 Btulhr
Component Length I I Height (ft) I Area (ft2) Rv
I
Heat Loss
Width (ft) (Btulhr)
Wall1 1-20 C +-t-~o2o 20.00 I 228
Window1 13 _L_ 2 .00 2,470 ---'-
Room : MASTER BATH
Gross Area:
Unheated Area:
Net Heated Area:
Ceiling Height:
Volume:
Air Changes :
Room Temp:
Floor Component
Floor Type :
Temp Below:
Floor Cover Rv:
Floor Insulation Rv:
Edge Rv :
Perimeter Rv :
Ceiling Component
Space Above Heated :
Net Ceiling Area :
Rv:
Room Components
Component 1
225 ft2
0 ft2
225 ft2
8ft
1,800 ft3
0.50 per Hour
72 °F
Suspended
72 OF
0.50
5.00
N/A
N/A
No
225 ft2
35 .00
Length I
Width (ft)
Height (ft) I
8 Wall1
Window1 -'------'--
25
7 5
Room : MASTER BED
Gross Area :
Unheated Area :
Net Heated Area :
Ceiling Height:
Volume :
Air Changes :
Room Temp :
Floor Component
Floor Type :
Temp Below :
225 f\2
0 ft2
225 ft2
9ft
2 ,025 ft3
0.50 per Hour
65 °F
Suspended
65 OF
Page6
Room Infiltration:
Total Heat Loss:
Upward :
Downward:
Supplemental :
Net:
Unit/Net:
Slab Depth :
Water Table Present:
Space Below Heated :
Downward Heat Loss :
Unit Heat Loss:
Floor Surface Temp:
Heat Loss :
1 , 753 Btu/hr
5,036 Btu/hr
825 Btu/hr
0 Btu/hr
5,861 Btu/hr
26 Btu/hr/ft2
N/A
N/A
Same Source
825 Btu/hr
3 Btu/hrlft2
83 OF
656 Btu/hr
(less sub components if any)
Area {ft2 )
200
35
Room Infiltration :
Total Heat Loss :
Upward :
Downward:
Supplemental :
Net:
Unit/Net:
Slab Depth :
Rv
20.00
2 .00
Water Table Present:
Heat Loss
(Btulhr)
842
1,785
1 ,837 Btu/hr
5,920 Btulhr
975 Btu/hr
0 Btu/hr
6,895 Btu/hr
31 Btu/hr/ft2
N/A
N/A
•
Floor Cover Rv:
Floor Insulation Rv:
Edge Rv :
Perimeter Rv:
Ceiling Component
Space Above Heated :
Net Ceiling Area:
Rv:
Room Components
Component
0.50
5 .00
N/A
N/A
No
225 ft2
35 .00
Length I j Height (ft)
Width (ft) Wall1 hl_ 31 8
Door1 5
-t--7
Window1 6 ·-f-7
Room : UPPER HALL
Gross Area:
Unheated Area :
Net Heated Area:
Ceiling Height:
Volume:
Air Changes:
Room Temp:
Floor Component
Floor Type:
Temp Below:
Floor Cover Rv:
Floor Insulation Rv:
Edge Rv :
Perimeter Rv:
Ceiling Component
Space Above Heated:
Net Ceiling Area:
Rv:
Room Components
128 ft2
0 ft2
128 ft2
8ft
1,024 ft3
0 .50 per Hour
65 OF
Suspended
65 °F
0 .50
5 .00
N/A
N/A
No
128 ft2
35 .00
• WIRSBO Radiant Panel Heating System
Space Below Heated:
Downward Heat Loss:
Unit Heat Loss:
Floor Surface Temp:
Heat Loss:
Same Source
Project #: 004
Date: 7110196
975 Btu/hr
4 Btulhr/ft2
78 OF
611 Btu/hr
(less sub components if any)
Area (ft2) j Rv
248 j_ 20.00
35 5 .00
42 2 .00
Room Infiltration:
Total Heat Loss :
Upward :
Downward :
Supplemental:
Net:
Unit/Net:
Slab Depth :
Water Table Present:
Space Below Heated:
Downward Heat Loss:
Unit Heat Loss:
Floor Surface Temp:
Heat Loss:
Heat Loss
(Btulhr)
812
665
1,995
929 Btu/hr
3 ,822 Btu/hr
640 Btu/hr
0 Btu/hr
4,462 Btu/hr
35 Btu/hr/ft2
N/A
N/A
Same Source
640 Btu/hr
5 Btu/hr/ft2
79 °F
347 Btu/hr
(less sub components if any)
Component I Length I Height (ft) I Area (ft2) Rv Heat Loss
Width (ft) (Btulhr)
c--Wall1 _j_
_ Window1
Room : UPPER STUDY
Gross Area :
Unheated Area:
Net Heated Area :
Ceiling Height:
Volume:
Air Changes:
Room Temp:
22 8 -
10 4
--~
196 ft2
0 ft2
196 ft2
8ft
1,568 ft3
0.50 per Hour
65 °F
r 76
40 --
Room Infiltration :
Total Heat Loss :
Upward:
Downward:
Supplemental:
Net:
Unit/Net:
Page 7
20.00
2 .00
646
1 ,900 -
1 ,423 Btu/hr
8,324 Btu/hr
1 ,372 Btu/hr
0 Btu/hr
9 ,696 Btu/hr
49 Btu/hr/ft2
•
Floor Component
Floor Type:
Temp Below:
Floor Cover Rv:
Floor Insulation Rv:
Edge Rv:
Perimet er Rv:
Ceiling Component
Space Above Heated:
Net Ceiling Area :
Rv:
Room Components
Component
Wall1
Door1 -Window1
Suspended
65 "F
0 .50
5 .00
N/A
N/A
No
196 ft2
35.00
Length I
Width (ft) I
45
6
Height (ft)
8 -
7
c-· 5 ·-19 --
• WIRSBO Radiant Panel Heating System
Slab Depth :
Water Table Present:
Space Below Heated:
Downward Heat Loss:
Unit Heat Loss:
Floor Surface Temp:
Heat Loss:
N/A
N/A
Same Source
Project #: 004
Date: 7110196
1,372 Btu/hr
7 Btu/hr/ft2
86 "F
532 Btu/hr
(less sub components if any)
Area (ft2 ) I Rv Heat Loss
(Btu/hr)
360 20 .00 1,05_9 _ r-~-1--5.00 -
798 1--2 .00 4 ,512 95
Notes: The intended use of this program is to provide accurate heat loss and design data for Wirsbo Radiant
Systems. The heat loss and design data generated by the program will only be as accurate as the information
supplied. Wirsbo Company is not responsible for the misuse of this program.
Page8
in c. P .01
FIELD RfPO~T
ATTENTION:
SENT A~
PROJl:CT:
t1 LJ FFeHs, f-PE e '<= 1...() T (t
OAf£:
ARRIVE:
Wf.ATHER:
.. WAlt.~ I :2PN N'i
JO.NUMIIEA:
1SO+·O!
TtQ WN 1 fiMI hmlng ~on fQr du. ptoject. The follow,g twrN .,. nottd:
1. WMre 1he triple LVL high ridGe roor beam burl nut to the upper floor atalra, f4J·2x4'• ww•
UMd wt.• .-.:ata.ct out C4r2x6'•· An •dd'llonel .2xA ne.d• to b4t edded to thle ttucf P•*-
2. At 1M lklt of window b~ow lbt bridge, wh•t tht VIIJII L VL WDII flOOf' bNin bttrf, ~ J
2x8 INd.
3. To add u• x 48" ·~in the toot abo"-~droom 209 ~ 1nt rnefttf bedroom, add •
1-314• x .f..112.lVL to lhe 2x12 rafter tnhtt aldtl of the •~t ~.
4. SaUd Wocldng needa 10 be added in 1he Jolst tpKe abov. lhe ~~~ waN at the caiWMYIIt
d4tdl on 1ht notlh Ufe, and below lh• ~mmera for tha &.rge window opMinu on 1t11 •••t 1ld1.
5. "' ~ eo .. noot eta1t o~. a.. .raort hMder acroaa ~· enc1 o.f a., o'*""u thould be
•n.dted ton c:"''dltWf end of 1t1e ~ble LVl bum wtd\ • exex1"' qr• wilh (2..,.314-
......, ttvvugh boltll Ndt ftO. Tht a-~ bmvMn lhe two bl.u 1hould be filled In wtdt loUd
bloddnQ.
6. Where lht bt.,. ~ below tho lowtr floor •talrw ¥¥ .. omfn.cf end I L VL ledQef ~ ~
10 the c:oncrtte well, ~d 2x4 fun1no IN4a btiiOw 1M and 'fJf tht beam 10 adaqu•• tu~Jport
lt.
7. Tht stMI bMm ovtr 1111 gar.oe doea not Ill Of'l the aw-l g1rage door header u orJain~Uy
pllnntd. Tht wtidtd ft-.Md beem connection IJ accep~.
f'fl'm .· 1,
ZEEb CLJ)JJ~ ·
&vf~clt(u_ ()}M_fL ~~
-------------------~----------·--------~~"--------~·~-
June 13 , 1996
Town ofVail
• ZEEB CONSTRUCTION, INC.
PO. Box 1997
A von, Colorado 81620
303 -949-3292
Dept of Community Development
75 South Frontage Road
Vail , CO 81 6 57
Dear Sirs:
•
Re: Bueffehr Creek -Lot 6 and Lot 7
Please be advised of a change in subcontractors for the abo ve-mentioned jobs. We have
terminated Snow Country Services, Inc. and hired Colorado Plumbing Service in their
place. Since the permits for these projects were issued to Snow Country Services, we
request these permits be cancelled and new ones issued to reflect Colorado Plumbing
Service as the plumbing and heating contractor of record .
T hank you for your cooperation .
Sam Yantzer
SY:sw
FEB-05-96 MON 1219:46 AM Zeeb cons~, inc. 970 479 0588 P.El2 • • • 1 ~nter-Mo.-ntaln
~ EngiP.eeringLt.t.
January 30, 1996
Zeeb Cons t:t:ucLiuu
PO Box 1997
RE: Foundation Inspection
Lot 7, Track A, Lia zniemer
Vail, Colorado
Project No. 95-0659~
Gentlemen:
The unders igned visited the site on January 13 1 1996 to
observe the soils exposed in the foundation excavation. The
exposed soils consisted of weathered SHAI)E and SILTSTONE BEDRO CK,
except for a portion of exposed soils at the southwestern corner of
the proposed residence. 'l'he exposed soils a t the southwestern
corner of the proposed residence consisted of sandy CLAY containing
shal e and siltstone fragments. The exposed soils/SILTS'l'ONE and
SHALE rock encountered in the footinq excavations were found to be
suitable for a bearing pressure of 3000 psf.
Should you have any quest ions regarding the information
C.::ontaiaed i n tii is .ceport, please contact tl1e undersigned.
Engineer
77 Metca lf Road, ##20 1 • Box 978 • Avon, Colorad o 61620 • Pno ne : 970-949 -5072 • From Den ver D1re ct: 893 -1531
14 20 van ce Stre8t • Lakewood, Culu1 auu 8021 s • Pl1 one: 303 -2 32 ·0 150
,
75 South Frontage Road
Van Colorado 81657
970-479-2138/479-2139
FAX 970-479-2452
• VaU
OFFICE COPY
T o wn of Va i l
75 South Frontage Road
Vail, Colorado 81657
(30 3 ) 479-2138
Plan analysis based on
Department of Community De ve lopment
the 1991 Uniform Building Code
Name: BUFFEHR CREEK CHALET #7
Date : SEPTEMBER 18 , 1995
Occupancy: R3,M1
Address: 1730 BUFFEHR CREEK RD.
Contractor: ZEEB CONST.
Architect: BRENT ALM
Type of Const : V-N Engineer : KRM
Plans Examiner: CHUCK FELDMANN
NOTE :The code items l i sted in t h is report are not intended to b e a complete
listing of all possible code requirements in the 1991 UBC. It is a guide to
selected sections of the code.
FL NAME AREA MIN.LIGHT MIN.VENT NO.EXITS EGRESS
------------------------------------------------------------------------
2 Master bedroom 245 24 .50 12.25 1 Yes
2 Master bath 131 0.00 6.55 1 No
2 Bedroom #1 154 15.4 0 7 .70 1 Yes
2 Bath room#1 45 0.00 2.25 1 No
2 Bedroom #2 216 21.60 10 .80 1 Yes
2 Bath room#2 41 0.00 2 .05 1 No
2 Bedroom #3 184 18.40 9.20 1 Yes
2 Bath room#3 41 0.00 2.05 1 No
2 Halls, closets, etc . 603 0.00 0.00 1 No
TOTAL FOR FLOOR 1660 1
1 Sitting room 252 25 .20 12.60 1 No
1 Dining room 188 18.80 9.40 1 No
1 Living room 306 30.60 15 .30 1 No
1 Kitchen 242 24 .20 1 2 .10 1 No
1 Garage 456 0 .00 0.00 1 No
1 Halls , closets, etc. 760 0.00 0.00 1 No
TOTAL FOR FLOOR 2204 1
B Bedroom 355 35 .50 17.75 1 Yes
B Office 200 20.00 10.00 1 No
B Halls , closets, etc. 124 0.00 0.00 1 No
TOTAL FOR FLOOR 679 1 Yes
BUILDING TOTAL 3864 2
0 R E"CYCLt"VPA.PER
75 South Frontage Road
Vail, Colorado 81657
970-479-2138/479-2139
FAX 970-479-2452
FOOTNOTES :
• •
Department of Community Development
1) EGRESS -An operable wi ndow or door that o pens directly to the exterior
is r e quired from this r oom. The minimum c l e ar openabl e area must meet
the following . --Sec . 1204.
1) The minimum c l e ar h eight i s 24 inches
2) The minimum clear width is 20 inches
3) The minimum c l e ar area is 5 .7 square f eet
4) The maximum si ll h e ight is 44 inches
2) The numb e r of exits is bas e d on Tabl e 33-A (Dw e llings)
3 ) A mechani c a l ventilation system ma y b e used in in li e u of exterior
openings for ventilation. --Sec. 1 205. (c)
4) Th e requirement for an egress window in t h e bas e me nt is based on
Sec. 120 4 .
ROOM DIMENSIONS:
Habitabl e space shall have a c e iling height o f not less than 7 f ee t 6
i nches. Ki t chens , halls , ba t hrooms and toi l et compartme nt s may have a
ceiling height of 7 feet meas ure d Lo the l o west projection. If t h e ceiling
i s sloping, then the minimum h e igh t i s requir e d in only 1 /2 of the area.
--sec . 1207 . (a)
Every dwelling unit shall have a t l east o n e room which ha s n ot l e ss than 1 20
square feet of floor area . Other habitabl e ro oms except kitc h e n s shall have
an area of not less than 70 square feet . --Sec . 120 7 . (b)
Habitabl e rooms oth er than a kitchen s h all not be less than 7 feet in any
dimension. --Sec. 1207 . (c)
GLAZING REQUIREMENTS :
All glazing in hazardous l ocat i o n s is requir e d to be o f safety
gla zing material. --Sec. 5406 . (d)
1) Glazing in ingres s and egress doors except jalousies.
2) Glazing in fixe d and sliding panels of sliding d oo r assemblies and
panels in swinging doors other than wardrobe d oo rs .
3) Glazing in storm doors.
4) Glazing in all unframed swinging doors.
5) Glazing in doors and enclosures for hot tub s , whirlpoo ls, saunas , steam
r ooms , b ath t ub s a nd showers. Glazing in any port i o n of a building wall
e n clos ing these compartme nts where the bott om exposed e dge of the
glazing i s l ess t han 60 inc hes above a standing s urface and drain inlet.
6 ) Glazing in fix e d or operable panels adjacent t o a door wh ere the nearest
exposed e dg e of t h e glazxing is within a 24 -inch arc of eith e r vertical
edge of the door in a clos e d position a nd where the bottom exposed edge
of the glazing is less than 60 inches above the walking s urf ace .
0 RECYCL I:.'Df'Al'ER
75 South Frontage Road
Vail, Colorado 81657
970-479-2138/479-2139
FAX 970-479-2452
• •
Department of Community De velopment
7) Glazing in an individual fixed or operable panel, other than those
locations described in items 5 and 6 above, than meets all of the
following conditions:
A. Exposed area of an individual pane greater than 9 square feet.
B. Exposed bottom edge less than 18 inches above the floor.
C. Exposed top edge greater than 36 inches above the floor.
D. One or more walking surfaces within 36 inches horizontally of the
plane of the glazing.
8) Glazing in railings r egardles s of height above a walking surface .
Included are structural baluster panels and nonstructural in-fill
panels.
See exceptions.
SMOKE DETECTOR REQUIREMENTS:
A smoke detector is required on the ceiling or wall at a point centrally
located in the corridor or area giving a c cess to each sleeping area.
--sec . 1210 . (a) 4 .
A smoke detector is required on the ceiling or wall in each sleeping
area.--Sec. 1210.(a) 4.
A smoke detector is required in the baseme nt. --Sec. 1210 . (a) 4.
A smoke detector is r e quir e d on all stori e s. --Se c. 1210. (a) 4.
If the upper l eve l contains sleeping room(s), a smoke detector is requir e d
in the ceiling of the upper l evel close to the stairway .
--Sec. 1210. (a) 4
Smoke d e tectors are required to be wired to the building's power source and
shall be equipped with a battery backup. Sec. 1210. (a) 3 .
Detectors shall sound an alarm audible in all sleeping area of the dwelling
in which they are located. --Sec. 1210. (a) 4.
FIREPLACE REQUIREMENTS:
FACTORY BUILT FIREPLACE:
1) Unit must be an approved unit. --S e c. 3705. (a)
2) Clearances and hearth size must be p e r manufactur e s approval .
--sec . 3 7 0 5 . (a) & (b)
3) Chimney height must be per manufacturer's approval and Tabl e 37 -B
OCCUPANCY SEPARATION:
Between the garage and the residence, materials approved for 1hr fire
construction are required on the garage side only and any doors between
the garage and the residence are to be a self -closing 1 3/8 inch solid
core door or a 20 minute fire door. --Table 5 -B & Sec. 503. (d) exc . #3
0 RE'CYCLJ::DPAPE::R
75 South Frontage Road
Vail, Colorado 81657
970-479-2138/479-2139
FAX 970-479-2452
STAIR REQUIREMENTS:
• •
Departme nt of Community Development
A stairway in a dwelling must be at least 36 inches wide . --Sec. 3306 . (b)
The maximum rise of a step is 8 inches and the minimum run is 9 inches.
--Sec . 3 3 0 6 . (c) exc . # 1
Provide a handrail on one side a stairway 34 to 38 inches above the nosing if
there is 4 or more risers. --Sec. 3306 . (i)
Provide a guard rail where drop off is greater than 3 0 inches. Minimum height
= 36 inches, maximum opening size= 4 inches . --Sec. 1712. (a) exc . #1
The minimum headroom is 6f t.-8 inches. --Sec. 3306. (o)
Enclosed usable space under the stairs is required to b e protect e d as required
for 1hr fire -resistive construction. --Sec. 3306. (l)
SHAFT ENCLOSURES:
1) Chutes and dumbwaiter shafts with a cross-sectional area of not mor e t han
9 square feet may lined on the inside with not less than 26 gage
galvanized sheet metal with all joints locklapped. The outside must be
1 hr construction. All openings into any such enclosure shall be protected
by not less than a self-closing solid wood door 1 3/8 inches t hick or
equivalent. --Sec . 1706. (f)
2) Gas vents and noncombustible piping installed in walls passing through
3 fl oo rs o r less do not need to be in 1 hour shafts.
--Sec. 1706. (c)
3 ) Shafts for gas vents, fact ory -built chimneys, piping, or ducts that do
not extend through not more than 2 floors need not be in 1 hour shafts.
--Sec. 1706. (c)
4) All other shafts are requir e d to be enclosed in a 1 hour assembly .
--sec . 17 0 6 . (a)
ADDITIONAL REQUIREMENTS:
For R3 occupancy
This project will require a site improvement survey . Such survey
shall be submitted and approved prior to request for frame
inspection.
All crawl spaces within the Town Of Vail are limited to a earth to
structural floor ceiling height of 5', be earth floor only, b e
ventilated as per UBC 2516(C)6 with minimum access as per UBC
2516(C)2 and maximum access of 9 sq . ft .
0 RE:CYCLEDPAPF:R
75 South Frontage Road
Vail, Colorado 81657
970-479-2138/479-2139
FAX 970-479-2452
• •
Department of Community Development
Any building site with a slope of 30 degrees or mor e shall require an
engineer design. Such design shall address drainage, soil retainage
and structural design.
Excavation below slabs on grade shall not be permitted without prior
approval.
Address numbers shall b e posted plainly visible and l e gible from the
street.
For Ml occupancy
Slope garage floor to allow for drainage to outside to provide a
floor drain with sand and oil intercept or to dry well or to sewer.
Any garage floor drain connected to sewer must be approved by Upper
Eagle Vall ey Water & Sanitation District.
In garages with living area above , the walls of the garage wiich are
bearing the area above shall be protected with one hour fire
resistive construction. UBC 503(B).
0 RECYCL E!) PA PF:R
75 South Frontage Road
Vail, Colorado 81657
970-479-2138/479-2139
FAX 970-479-2452
•
Town of Vail
75 South Frontage Road
Vail , Colorado 81657
(303) 479 -2138
Plan review based on
•TownofVaU
{)FFICE COPY
Department of Community Dev e lopment
the 1991 Uniform Building Code
Name: BUFFEHR CREEK CHALET #7
Date: SEPTEMBER 18, 1995
Occupancy : R3 ,M1
Address : 1730 BU F FEHR CREEK RD.
Contractor: ZEEB CONST.
Archit e ct: BRENT ALM
Type of Const: V-N Engine er: KRM
Plans Examiner: CHUCK FELDMANN
=============================================================================
1
2
3
4
This project wi l l requir e a site improvement survey.
This survey shall be submitted and staff approved
prior to a requesL for a frame inspection . Under no
circumstances will a frame inspection be done
without an approved site improvement survey .
All new construction within the Town of Va i l will be
required to have an initial inspection by TOV Public
Works Dept. to approve site drainage and culvert
installation. This approval must be complete pr i or
to any inspecti o n by the Building Department.
This project is restricted from the burning of wood
in fireplaces . Unless the loL is a restrict e d lot
in size , thr ee gas logs fireplaces and thre e gas
appliances are permitted per unit allowed . Gas log
chimneys enclosures shall be one hr . protecte d.
In bathrooms wi th a tub o r shower and in laundry
rooms a mechanical ventilation system connected
directly to the outside shall be provided . Bathrms
which contain only a water closet or lav . may be
v e ntilated with a recirculating fan. UBC 1205(c).
A \.I REC YCLED PAPER
75 South Frontage Road
Vail, Colorado 81657
970-479-2138/479-2139
FAX 970-479-2452
5
6
7
8
9
10
11
12
1 3
• •
Department of Community Development
Domestic clothes dryer exhaust ducts shall be
installed as per UMC 1104 and 1903. Flexible duct
connectors may not exceed 6' in length and shall not
be concealed within construction . Ducts shall
terminate outside the building and not exceed 14 '
l ength .
No domestic dishwashing machine shall be directly
connected to a drainage system without the use of an
approved dishwasher air-gap fitting. UPC 608 .
Cross connection control devices shall be installed
to protect pollution of potable water supply by use
o f approved backflow prevention devices. UPC 1003.
Plumbing fixtures with mechanical apparatus shall be
supplied with an access panel for inspection and
r epai r of equipment. UPC 904 .
Domestic ranges shall have a vertical clearance
above the cooking surface of not less than 30" to
unprotected combustible material . UMC 1901 .
Heating and cooling equipment located in the garage
shall be installed with the pilots and burners or
heating elements and switches at least 18" above the
floor level of the garage . UMC 508.
A chimney enclosure for a wood burning fireplace
fl u e shall be protected by a one-hour fire resistive
construction. UBC 1706. Thi s involves lining the
in side of such chase with 5/8 " Type X sheetrock and
fire-taping joints.
Approved gas logs may be installed in solid-fuel
burning fireplaces provided the installation is
accordi ng to the listing instructions, any damper
shall be removed or permanently blocked, and a
safety shutoff valve is provided . UMC 803.
Supply a mechanical drawing indicating design of
system , size (BTU and volume) of equipment, vent
location and termination, and combustion air to be
supplied p rior to any i n stallation.
0 HEC YCU'n PA PF.R
•
75 South Frontage Road
Vail, Colorado 81657
970-479-2138/479-2139
FAX 970-479-2452
14
15
16
17
18
19
20
• •
Department of Community Development
Due to Colorado State Statut es , all sink fauc etts
and shower heads are r equ ired to utiliz e flow
r estriction d evices . Also, the maximum water closet
flu s h usage is limited to a maximum of 3.5 gallons
p er flush.
At eave s and valleys an adequate underlayment shall
be provided to protect a structure from ice buildup
and water damage. Two layers of f elt solid mopped
to sheathing and b etween layers or a commercial
water & ice shield may b e us e d as per Tabl e 32B1 .
In addition to a minimum reinforcement, not l ess
than two #5 bars s hall be provided around all window
and door openings . Such bars shall be extended
b eyond the corners of the openings not les s than
24". UBC 2614(d)7 .
Any building site with a slope greater than 30
degrees shall require engineer designed drawings.
Avalanche areas shall require such engineered
drawings also. Drainage and structural integrity
shall be addressed by such drawings.
Because of this project's location, the foundation
is required to be dampproofed to prevent damage to
areas below finished grade . UBC 1707(d).
The structure is required to be anchored to the
foundataion with 1 /2 inch anchor bolts. The bolts
must be into the concrete or masonry 7 inches and
spaced a maximum of 6 feet apart. See code for
additional requirements . --Sec . 2907. (f)
Include a copy of the soils report for the site to
b e built on . --Sec. 2905 .
0 HJ::CYCL t 'DI'APER
• •
HocHSTADT, STRAw ·& STRAuss, P.C.
JORDAN HOCHSTADT
GEORGE M . STRAW
RICHARD S . STRAUSS
Dr. Edward Zneimer
P.O . Box 305
Minturn , co 81645
ATTORNE Y S AND C OU N SELLORS A T L A W
2 0 43 YO RK ST REET
DENVER, C OLORADO 8020S
T E L E PH O NE : (303) 329 -9 22 2
TELEF'A X : (303) 333 -7 127
October 24, 1994
RE: Lot 7, Lia Z n eimer Subdivision
H O N . C HARLES A. F RIEDMAN
OF' COUNSEL
Dea~ Ed· {rl ~
Enc sed please find the revised Second Amendment and a
red-lined cop as compared to first versio n dated October 13, 1994 .
As per our telephone conversation, the f o llo wing changes were made :
1. I understand Lot 7 ha s no caretaker unit. Therefore,
that language was eliminated and an affirma t ive state me nt was added
reflecting that no caretaker un i t was being constructed .
2 . I added language wh i c h mak e s it ev e n c l e are r that
Buffehr Creek Partn'ers alway s r e tain the right to lo c ate utilities
in the Open Space of any Lot_ T he Open Space is all of the real
estate (including the Drainage Ease me nt) exce pt the Building
Envelope. Thi s definition i s the s am e as i n the other Declarations
that also reserved the right to locate uti l ities in the Open Space
as opposed to the located roads. I gather that the various
utilities servicing all seven Lots are now being extende d from a
number of points in the subdivision so the generic utility
easements meet these requirements so long as they do not encroach
on a Building Envelope . ~
I recommend that you deliver this version to the Town of
Vail for r eview as it addresses Vail's conc e r ns vis a vis the
Ordinance we are working under, the new Drai nage Easement and the
Pond. It also ties together all seven Lots on the east side of the
Buffehr Creek Road . The only significant d if f e r e nce between what
we started with and ended up with is the fa ct that five Lots are
paying for the first private driveway and two lots are paying for
the second private driveway whi c h is both r e asonable and fair.
Kindly advise me as to any comm ent s and j or requested
revisions the Town of Vail may have.
GMSjsaj
Enclosu re
Very trul y yo urs,
HOC HS TADT, ST RAW & STRAUSS, P .C.
N :\ ... \~EI M EJI\I.OT7\ZN E IME R1 Ll R
•
TO: MIKE McGEE ' TODD OPPENHEIMER
,RANDY STOUDER
Return to ----''------
Town Pl~nncr
INTER-DEPARTMENTAL REVIEW
.PROJECT: LJ1 ~·vU ~ (Ar{] . .
DATE SUBMITTED: f52 DATE OF P_UBLJC HEA~~G ------
t.p~ ~ ~'7~ yr $a
COMMENTSNEEDEDBY:_-+~~~~. ------------
BRIEF DESCRIPTION OF THE PROPOSAL:
1?1' /,; ~7 /IW( )>w
~ ;11M?/ ~ ~ ;t--/
Engineering:
Reviewed by:_\e_er_n_· ___ Date: a.1q /q4
Landscaping:
Reviewed by: _____ Date: ___ _
Comments:
Fire Dept.:
Reviewed by:-----Date: ___ _
Comments :
Distributed to the Fire Department, Public Works, and Land scaping on.--6?~,_._3_( ____ .
' '
SECOND AMENDMENT AND SUPPLEMENT
TO
DECLARATION OF PROTECTIVE COVENANTS
AND
EASEMENT DEED COVENANTS FOR PRIVATE ROAD AND UTILITIES
ANNEXATION OF
..
'
LOT 7 AN D TRACT C, LIA ZNEIMER SUBDIVISION, EAGLE COUNTY, COLORADO
TO WHOM IT MAY CONCERN
A. HISTORY
1. Buffehr Creek Partners, a Colorado Limited
Partnership, (hereinafter referred to as "Buffehr Creek Partners")
was the subdivider, via the Single Lot Subdivision ordinances of
the Town of Vail, Colorado of the three Lots legally described as
Lots 1, 2 and 3, Lia Zneimer Subdivision, Eagle County, Colorado.
2. Lots 1 and 2 were purchased and developed by
LindseyjNilsson Development, Inc.; Lot 3 was purchased, owned and
developed by BC Lot·3 Limited Liability Company. Three homes were
constructed upon Lots 1, 2 and 3.
3. Pursuant to the Single Family Lot Subdivision
Ordinance of the Town of Vail, Colorado, Chapter 17.25, Lots 1, 2,
and 3 were each, severally, subdivided, platted and conveyed and,
as required by the Town of Vail, a Declaration of Protective
Covenants (hereinafter referred to as the "D e claration") was
imposed against the three Lots and the Decla ration was recorded
November 5, 199 2 in Book 590 at Page 722 (Rec eption Number 486821)
of the records of the Clerk and Recorder of Eagle County, Colorado.
4. Lots 1, 2 and 3 were constructed upon a private Road
(hereinafter the "Road" or the "Easement" or the "First Easement")
connecting with the public Buffehr Creek Road and an Easement Deed
Covenants for Private Road and Utilities (hereinafter referred to
as the "Covenants") was recorded November 5, 1992 in Book 590 at
Page 723 (Reception Number 486822) of the records of the Clerk and
Recorder of Eagle County, Colorado. The Road was planned to also
service proposed Lots 4, 5, 6 and 7.
5. Subsequent to the platting of Lot 5, a determination
was made by Buffehr Creek Partners and the Town of Vail that the
Road would only service Lots 1, 2, 3, 4 and 5 . Lot 5 was
subsequently conveyed to BC Lot 5 Limited Liability Company and a
home was subsequently constructed upon Lot 5 by BC Lot 5 Limited
Liability Company. When Lot 5 was platted, Lo t 4 was designated on
the Plat as "Tract B."
..
6. To evidence the Plat of Lot 5 and Lot 4/Tract B
together with the extension of the Road to Tract B and Lot 5, the
First Amendment and Supplement to the Declaration of Protective
Covenants and Easement Deed Covenants for Private Road and
Utilities was recorded with the Clerk and Recorder of Eagle County,
Colorado on June 6, 1994 in Book 642 at Page 116 (Reception Number
538163).
7. To evidence the termination of the private Road (not
the Utility Easement) at and including Lot 6 , a Vacation Instrument
was recorded with the Clerk and Recorder of Eagle Cou nty, Colorado
on July 7, 1994 in Book 644 at Page 685 (Reception Number 540730).
8. Summary: Lots 1, 2 , 3 , 4/Tract B and 5, Lia Zneimer
Subdivisio n are subject to the Declaration and the Easement Deed
Covenants for Private Road and Utilities which define the uses and
occupations of the Dwellings constructed upon the Lots and the
First Road and including the cost sharing arrangement between the
seven Lots.
B. CURRENT DEVELOPMENT
1. Buffehr Creek Partners has poured a foundation on Lot
7 and Lot 7 can, and has been, platted. The Lot 7 Plat is attached
hereto and incorporated herein by reference as Exhibit 1 and which
Exhibit 1 is a further Single Lot Subdivision of Tract A.
2. Exhibit 1, the Lot 7 Plat, was prepared by Alpine
Engineering, Inc., Job Numbe~ , dated and
executed by Kendrick E. Neubecker, Colorado Land Surveyor No.
24325 .
Note 1: The planned, but yet not resubdivided fr om
Tract A, Lot 6 is described on Exhibit 1 as "Tract C."
Pursuant to Vail Ordinance 17.25.010, Tract C cannot be
resubdivided as Lot 6 until such time as a foundation has been
constructed upon Tract C. If, and when, a foundation is so
constructed, Tract C may be conveyed from Buffehr Creek
Partners if a Single Family Subdivision has been approved by
the Town of Vail.
3. Lot 6/Tract C and Lot 7 are the last two Lots to be
developed and subdivided from Tract A east and south of Buffehr
Creek Road. The Declaration of Protective Covenants and Easement
Deed Covenants for Private Road and Utilities for Lot 6/Tract C and
Lot 7 are set forth below .
-2-
' C. SECOND DECLARATION OF PROTECTIVE COVENANTS
COVENANTS, CONDITIONS AND RESTRICTIONS FOR
LOTS 6 (Tract C until legally subdivided) and 7,
LIA ZNEIMER SUBDIVISION
EAGLE COUNTY, COLORADO
INCORPORATED INTO THE PLAT OF LOTS 6 (Tract C) and 7
LIA ZNEIMER SUBDIVISION
EXHIBIT 1 PLAT PREPARED BY EAGLE VALLEY SURVEYING, INC.,
STAN HOGFELDT,COLORADO P.L.S. 26598
PURSUANT TO
C.R.S. 38-51-100.3 ET. SEQ.
(MINIMUM STANDARDS FOR LAND SURVEYS AND PLATS)
RECORDED PURSUANT TO
C.R.S. 38-35-109
·~
(INSTRUMENTS AFFECTING TITLE TO REAL PROPERTY TO BE RECORDED)
THE OWNER HOLDING TITLE TO THE TWO LOTS:
Buffehr Creek Partners Limited Partnership
TO WHOM IT MAY CONCERN
Buffehr Creek Partners (hereinafter "Owner" or the
"Declarant") of the real estate (hereinafter sometimes ref erred to
as the "Two Lots") depicted and legally des cribed on the Plat ("the
Plat") of Lots 6/Tract C and 7, Lia Zneimer Subdivision, Eagle
County, Colorado and whi ch is attached hereto and incorporated
herein by reference as Exhibit 1. The Declarant does hereby
subject the aforesaid two Lots and being Exhibit 1 to the following
Covenants which shall run with the land and be binding upon the
heirs and assigns of the Owners.
ARTICLE 1
GENERAL PROVISIONS
The Declarant is the Owner of the real estate described
on the Plat. The Exhibit 1 Plat is a port ion of the real estate
(the u.subdivision") commonly know as "The Valley, Phase VI" and
which has been approved by the Town of Vail, Department of
Community Development, Planning and Environmental Commission on
October 22, 1990, for subdivision into thirteen (13) Lots pursuant
to Vail Ordinance 17.25.010 et. ~(Single Family Subdivisions).
The Lia Zneimer Subdivision was r equi red by the Town of
Vail to be subdivided into thirteen (13) Lots via three Phases.
The two Lots subjected to this Declaration are the last two Lots
located south of Buffehr Creek Road .
-3-
' ..
Appurtenant to each of the two Lots, each person or
entity taking 'titl e to a Lot from the Owner is also granted an
undivided one-half (1/2) interest, as a tenant in common, in and to
the Private Road and Utility Easement (hereinafter referred to as
the "Second Road") which shall provide access to the Owners of Lots
6 and 7 from their Lot to the public way on Buffehr Creek Road.
The undivided and non-exclusive tenant in common interest in the
Second Road shall be appurtenant to e ach Lot, shall be inseparable
from each Lot and, the Easement crossing an Owner 's Lot shall not
cause a merger of the Easement into the Lot Owner's fee estate.
Any severance or further subdiv ision of th e Second Road Easement
from a Lot shall be null and void . The provisions governing the
Second Road and the Utility Easement are set forth below.
ARTICLE 2
DEFINITIONS
1. "Owner" means any person, corporation, partnership,
joint venture, limited partnership, limited liability company or
any other entity holding record title to a Lot.
2. "Plat" means the Improvement Survey Plat as defined
by C.R.S. 38-51-100.3 and Ordinance 17.08.130 and recorded with the
Eagle County Clerk and Recorder and referenced above as Exhibit 1.
3. "Lots" mean Tract C (Lot 6 when it is platted) and
Lot 7 legally described on the Plat together with the undivided
one-half (1/2) interest as tenants in common ownership of the
Second Road and Utility Easement as defined as a "Privat e Street"
in Ordinance 17.08.120 and as shown and defined on the Exhibit 1
Plat.
4. "Building Envelope" means
on the Plat of Lot 7 and being
Envelope of Lot 6 will be defined in the
time as it is platted.
th e area shown and defined
square feet. The Building
Third Amendment at such
5. "Road or Second Road" means the Private Road and
Utility Easement servicing Lots 6 and 7 to the public way on
Buffehr Creek Road and as defined by Ordinance 17.08.170. The
Private Road and Utility Easement legal description is shown on the
Plat. · The rights and obligations of the two Lot Owners and Buffehr
Creek Partners with respect to the Road and Utility Easement is set
forth on the Easement Deed Covenants for Private Road and Utilities
set forth below.
6. "Primary;secondary Residential Dwelling" means any
Dwelling constructed pursuant to Vail Ordinance 18.13.010. The Lot
7 Residential Dwelling does not have a Secondary Residential
Dwelling as a portion of its construction.
-4-
' 7. "Building" shall mean any structure having a roof
supported by columns or walls, or any other enclosed structure for
the housing or enclosure of persons, animals or property (Ordinance
17.08.055).
8. "Ordinance" means the Ordinances of the Town of
Vail, Colorado, as enacted on the date of this Declaration and as
thereafter amended. All definitions co ntained within the
Ordinances are incorporated into this Declaration by reference.
9. "Open Space" means all of the real estate located
within Lots 1, 2, 3, 4 (Tract B), 5 , 6 (Tract C) and 7 except the
real estate located within a Building Envelope. Declarant reserves
the right to locate utilities in the Open Space.
10. "Project" shall mean the Subdivision, the thirteen
(13) Lots created from the Subdivision and the Dwellings
constructed , or to be constructed, upon the Lots within the
Subdivision.
11 . "Homeowner's Association " means Buffehr Creek
Homeowner's Association, a Colorado not for profit corporation,
that may be formed by Buffehr Creek Partners or the Lot Owner's to
perform the Owners ' duties and obligations under the Declaration,
First Amendment or this Second Amendment and to enforce the same.
12 . "Pond " means the reflecting pool constructed and
located upon, and appurtenant . t o, Lo t 7 .
. <
13. "Existing Drainage Easement" means the present
Drainage Easement upon Lot 7 and Tract C. The Existing Drainage
Easement is merged by this instrument into the Drainage Easements
shown on the Exhibit 1 Plat of Lot 7/Tract C.
14. "Drainage Easement" means the Existing Drainage
Easements on Lots 1, 2, 3, 4 (Tract B) and 5 together with the
"Additional Drainage Easement" as shown on the Exhibi t 1 Plat of
Lot 7 and Tract C and which Easement shall be a burden and a
benefit to Lot 7 and Tract C.
ARTICLE 3
PRIMARY/SECONDARY RESIDENTIAL DWELLINGS
1 . A Primary Residential Dwelling (Unit) is, or has
been, constructed within the Building Envelope upon Lot 7. No
Secondary (Caretaker) Unit has been constru cted.
-5 -
' ARTICLE ·4
BUILDING ENVELOPE
'
1. All Buildings on Lot 7 shall be constructed and
located within the Building Envelope and shall not encroach upon
the Open Space and within which is l oc at e d th e Drainage Easement.
2. A Building Envelope may be modified with the
approval of the Vail Design Review Board ba sed upon detailed review
of an individual architectural and site plan for a Dwelling Unit .
The Design Review Board shall find that the modification to any
Building Envelope does not substantially result in any negative
impacts upon the Lot, adjoining Lots or have any adverse impact
upon required geologic hazard considerations.
3. If an association of homeowners within the Project
is formed, any modification of a Building Envelope shall also
conform to the rules and regulations adopted by the Association.
4. Any modification of the Building Envelope shall not
exceed fifteen (15) feet in length andjor width and, in no case,
shall any Building be built in the twenty (20) foot setbacks shown
on the approved development plan.
ARTICLE 5
OPEN SPACE/LOT 7 POND
1 . No fences or d q rnesti c style landscaping shall be
constructed or permitted in the Open Space.
2 . Open Space shall be preserved in its natural state.
3. Real estate within the Building Envelope and
immediately contiguous to the Building Envelope may be "improved"
with sod lawns and fences, but Buildings, inc luding fencing and
sheds, may not be erected outside of the Building Envelope. The
Pond on Lot 7 is specifically approved.
4. Declarant and for its heirs, assign and designees,
RESERVES the right, at any time and from time to time, to designate
and create Utility Easements and install Utilities within the Open
Space (·including the Drainage Easements) for the use and enjoyment
of the Owners of the Buffehr Creek Subdivision . The liability of
the Declarant for exercising of this reserved right shall not
exceed the cost of returning the Open Space t o its natural
condition as required by this Declarati o n. T his r eserved right may
be assigned by Declarant to the Buffehr Creek Homeowner's
Association or all of the Owner's of the Project.
5. The Owner of Lot 7 shall, at its sol e cost and
expense, keep, preserve, maintain, r e pair, r estore and replace the
Pond located upon Lot 7 including, but n o t l i mited to, the physical
-6-
construction, specifications and configuration of the Pond,
plantings associated with the Pond, filtration and circulation of
the water to keep it clean and clear and maintain the Pond water
level at its maximum high water mark via the domestic water supply
servicing the Dwelling and the Pond.
The Owner shall periodically drain the Pond as needed to
clean, repair and otherwise prevent the P ond from leaking and
refill the Pond.
The Owner shall permit without co st or charge, if
requested by the Town of Vail, the Town's use of the water in the
Pond for firefighting purposes so long as the Town agrees to
reimburse the Owner for any reasonable damage done to the Pond, i ts
plantings and to replace the water used by the Town for
firefighting purposes.
The Owner shall, at all times, not obstruct the Drainage
Easement and shall at all times keep the Pond inlet, drain, riser
and spillway free and clear of obstructions and debris that inhibit
the natural flow of upstream runoff.
ARTICLE 6
HOMEOWNER'S ASSOCIATION AND GENERAL MATTERS
1. Declarant reserves the right to assign and convey
any duty or obligation of Declarant hereunder to the Buffehr Creek
Homeowner's Association, a C9lorado not for profit corporation that
is, or may be formed, by Declarant or the Owners, as provided for
herein .
2. The Owner's may, upon a majority vo te of the Lot
Owners subject to the Declaration and First and Second Amendments
to the Declaration, assign and convey the enforcement of any duty
and obligation of the Owners set forth in this Second Amendment to
Declaration to the Buffehr Creek Homeowner's Association.
3. This Second Amendment to the Declaration may be
enforced by any Owner of a Lot or interested party, or, at its
option, the Town of Vail, Colorado.
4. These Protective Covenants, with the exception of
those defining the Secondary Dwellings, Building Envelope and Open
Space, s hall expire on December 31, 2021, unless renewed by a
majority of the Lot owner's then s u bject to these Covenants
recording with the Eagle County Clerk and Recorder , Colorado, an
instrument executed by them extending such Covenant s for a period
of time, to not exceed fifty (50) years. A majority of the Owners
of platted Lots may amend, modify, revoke or supplement these
Covenants so long as they adhere to the restrictions on Declarant
set forth below in Paragraph S(a).
-7 -
5. Decl a rant reserves the right to amend, modify,
revoke or supplement these Covenants, without the permission of any
Lot Owner or those claiming by, through or under him; (a) so long
as the Building Envelope and Open Space and Dwelling is not
affected; or, (b) until the year 2000 or (c) such time as Buffehr
Creek Partners, a Colorado Limited Partnership has conveyed all of
its interest in the Subdivision, whichever event occurs first.
6. Notwithstanding Paragraph 5, no person or entity,
may amend or terminate these Covenants without the written
approval, in recordable form, of the Town of Vail.
D. EASEMENT DEED COVENANTS FOR PRIVATE ROAD AND UTILITIES
(as described on Exhibit 1 attached hereto)
RECITALS
Buffehr Creek Partners is the owner of Lot 6/Tract C and
Lot 7, Lia Zneimer Subdivision, Eagle County, Colorado being
described on Exhibit 1.
The Declarant and Town of Vail originally intended that
the seven Lots to be platted and located on the south side of
Buffehr Creek Road a n d all seven Lots to be serviced by a single
private Road which also included a Utility Easement. Subsequently,
the Road (now referenced as the First Road) has been modified to
only service Lots 1, 2, 3, 4, .and 5 . Lots 6 and 7 will be serviced
by a Road (the Second Road) ~lso which adjoins and is adjacent to
Buffehr Creek Road approximately 300 feet s o uth of the First Road .
The Plat of Tract CjLot 6 and Lot 7 including the
physical dimensions of the Road and Utility Easement are shown and
described on the Exhibit 1 Plat .
At the time of recordation of these Covenants further
defining the Easement, Lot 6/Tract C and Lot 7 are owned by Buffehr
Creek Partners.
The physical Second Road Easement, Exhibit 1, will
eventually be constructed into the shape of a "T". Presently the
physical construction of the Easement is in the form of only the
west arm of the "T" and the vertical, north jsouth portion of the
"T" that services Lot 7 to the public way upon Buffehr Creek Road.
The east (and longer) arm of the "T" will service Lot 6\Tract C
when platted and that portion of the Second Road located and
constructed .
Each Owner of Lot 6 or Lot 7 , when a Lot is conveyed by
Buffehr Creek Partners to such Owner, shall ow n an undivided and
non-exclusive o ne -half (1/2) interest, as tenants in commo n with
the other Owner, in and to the Road and Utility Easement legally
-8 -
described on the Plat. The Easements created herein are for the
benefit of, and appurtenant to Lots 6 and 7. The covenants set
forth below shall run with the two Plat ted Lots and the Easement
shall be binding upon the aforesaid two parties, their grantees and
their heirs, personal representatives and assigns.
ARTICLE 1
THE SECOND ROAD EASEMENT
Specific Definitions for the Road and Utility Easement:
1. "Road " (in addition to the Plat legal description of
the Easement) means the physical structure constructed by Buffehr
Creek Partners upon the Easement to provide access from Buffehr
Creek road to Lots 6 and 7 and under the t erms and provisions set
forth herein.
2. "Utilities" mean the electrical, water, gas,
telephone, cable and any other such items now, or in the future,
generally considered to be a "utility " necessary for the use and
occupation of Lots 6 and 7 and either buried in the ground under
the surface of the Road, Open Space or Drainage Easement, in the
surface of the Road or affixed above the surface of the Road or
Open Space.
3. "Tenant in Common" or "Co-Tenant" means one of the
two Owners of a Lot served by the Easement. Two (2) Lots wi ll be
served by this Second Road E~sement and each Lot Owner will own a
one-half (1/2) undivided interest in the Second Road Easement and
the Utility Easement. The description of the Easement serving Lot
6 will be set forth on a future plat of Lot 6.
ARTICLE 2
UTILITY EASEMENT
1. Each of the two (2) Lot Owners and their successors
and assigns is granted a non-exclusive perpetual Utility Easement
over, across, above, upon and under the Road Easement and Open
Space, including the Drainage Easement, for ingress and egress and
utility services to his Lot. The Second Roadway and the Utility
Easement is for the benefit of, and appurtenant to, each Lot and
may not be subdivided or severed fr om the L ot .
2 . Each Lot Owner may use the Utility Easement for the
use and benefit of the Lot for the installation, repair, removal,
or restoration of utilities, including cable television and any
further inventions or devices that become utilities to service the
Lot.
-9-
'
ARTICLE 3
PURPOSE OF ROADWAY AND THE UTILITY EASEMENT
The purpose of the perpetual Second Roadway Easement and
the Utility Easement is for a non-exclusive access drive and
roadway and general utility easement (in addition to the Utility
Easements across, over and under the Open Space) to exist from the
public way at Buffehr Creek Road (the "Public Way") to provide non-
exclusive private access to the two (2) Lots and for the use and
benefit of the Owners thereof. "Driveway purposes" as used in this
Second Amendment to Declaration means use thereof by vehicles,
persons on foot, horseback or other types of wheeled vehicles or
any other conveyance now or in the future used for the movement of
persons and property.
Emergency vehicles such as fire trucks and very heavy
vehicles such as moving vans, trash haulers and construction
equipment may use the Road for: (1) ordinary course of business
movement; (2) so long as their use of the Easement does not damage
the Road; or, (3) so long as the Owner who benefitted from such use
pays for the damage to the Road surface caused by such equipment.
In the event that steel tracked equipment and vehicles
with load limits in excess of 50,000 GVW's are permitted by an
Owner of a Lot to use the Road, all damages and subsequent costs of
repair caused to the Road by the use of such equipment shall be the
sole cost and expense of the Owner permitting such use.
The Utility Easement is for the installation of any
needed utilities, both before and after construction of the Second
Road, to the two Lots and as determined or required by any owner of
a tenant in common interest in the Easement. Any Owner may, by
further conveyancing, grant from time to time, interests in his
interest in the Utility Easement to utility companies to service a
Lot or Lots and it is agreed pursuant to this Second Amendment to
Declaration and by the tenant in common Owners that a general quit
claim of the Utility Easement in favor of utility providers and for
servicing the two Lots is granted hereby without further
conveyancing. Subject to the rules and regulations of the utility
providers, no Owner may deny any other Owner the right to "tap
into" or "tie into" existing utilities serving a Lot or the two
Lots, so long as such Owner does not impair the service to the
existing Owner or increase the costs to such Owner.
ARTICLE 4
COVENANT THAT OPERATION OF EASEMENT
NOT INTERFERE WITH TWO LOTS
The Owner's of the two Lots shall use and operate the
Easement and Road in such a manner that the operation thereof will
in no way hinder or prevent the proper and reasonable use and
enjoyment of both of the two Owners of the Lots.
-10-
'
No Co-Tenant shall place ·fences, obstructions, barricades
or other structures on or across any portion of the Easement or
Second Road, including parking, which will prevent or impede the
flow of pedestrian and vehicular traffic as intended, except for
temporary periods required for maintenance or initial construction
of the Second Road, utilities, reconstruction, utility maintenance
or to prevent the Easement and Second Road from becoming a public
way.
Both Owners subject to and as provided for in this Second
Amendment to Declaration shall maintain any portions of the Road
such as access points, parking areas and driveways located upon
their Lots in good, useable and attractive condition at all times
and at least to the standards of the Road.
ARTICLE 5
EXPENSES TO BE SHARED
Except as otherwise set forth herein, all costs and
expenses of the Easement shall be shared as follows: the Owner of
each of the two Platted Lots shall contribute one-half (1/2) of the
cost. Until Lot 6 has been Platted, the Owner of Lot 7 shall each
pay 100% of the costs. In the event that (1) any owner thereafter
completion of first construction of the Second Road determines to
install in the Uti~ity Easement underground or overhead utility
services or takes any other action that damages or destroys the
surface or support of the Second Road and which action is
undertaken for the sole benefit of such Owner, in such case all
costs and expense of such work, including restoration of the Second
Road surface, shall be at the benefitted party's sole cost and
expense; and, (2) if any Owner exceeds the load limits on the
Second Road as set forth above and such activities cause
unreasonable wear and tear to the surface of the Second Road, such
party shall be responsible for the cost attributable to the
deterioration to the Second Road caused by s u c h activities in
excess of reasonable wear and tear.
ARTICLE 6
MAINTENANCE AND REPAIRS OF ROAD EASEMENT DEFINED
The repairs and maintenance to b e undertaken and
performed under this Second Amendment to Declaration by the Owners
with respect to the Second Road Easement shall include the
following which listing is not to be exclusive:
1 . The Easement shall b e repaire d, maintained and
replaced to the same standard, and in conformity with, the
standards established and used to create and surface the Second
Road pursuant to Town of Vail, Colorado required standards for
Private Street supporting the then current traffic load. The
expense of such work shall be apportioned equally between the two
Lot Owners as set forth above.
-11-
' '
2. Repairs, maintenance.and restoration of the Second
Road shall include filling of chuckholes, snow removal, salt
replacement, regrading, resurfacing with blacktop or concrete and
such other necessary work as is reasonably required to maintain the
Second Road in a safe, attractive manner and in conformance with
any governmental regulations or requirements governing the
Easement.
ARTICLE 7
LIMITS OF LIABILITY
The Owners of each Lot, proportionately hereto agree, as
set forth above, to bear the costs and expenses of repairs,
restoration and maintenance of the Second Road authorized by them
or as needed and as follows:
1. Such costs and expenses shall not exceed, in the
aggregate, the sum of Eight Thousand Dollars ($8,000 .00) the first
year subsequent to construction of th e Second Road to both Lots
unless a greater sum is authorized in writing by the Owners of the
Lots required to bear the costs by this Second Amendment to
Declaration. The aforesaid sum is to increase each year by ten
percent (10%), not compounded, and assessments may exceed such
number so long as they are spread out over the number of years
necessary to meet the maximum sum test.
2 . Resurfacing, blacktop and other capital improvements
required to maintain the Second Road in a first class condition for
its intended purposes shall not be subject to the limitation set
forth above. However, capital improvements determined to be
performed shall be set forth in a formal budget, bids and otherwise
documented and which shall be presented to the Owners at least one
(1) month prior to the commencement of any capita l improvement.
Any Owner required to co ntribute to the cost of a capital
improvement may contest in Eagle District Court the need for the
capital improvement and the cost of the capital improvement . The
party adjudicated to have acted in good faith and consistent with
the purposes and intent of this Second Amendment to Declaration
shall be awarded all of its costs and attorney fees for such a
hearing.
ARTICLE 8
DESIGNATION OF BUFFEHR CREEK PARTNERS AS INITIAL MANAGER
Buffehr Creek Partners is hereby irrevocably designated
as the agent for the Owner(s) of the Easement to contract for and
oversee the repairs, maintenance, restoration and improvements
authorized under this Second Amendment to Declaration with respect
to the Second Road. Buffehr Creek Partners may, in writing and
without the permission of any Owner, assign, in whole or in part;
(1) the aforesaid rights and duties to the Town of Vail ; (2) the
aforesaid rights and duties to one or both Owner(s) of the Lot(s);
-1 2 -
'
(3) a Manager authorized by Colorado Real Estate law to manage real
estate (a Broker) engaged to manage the Road and the Easement; or,
(4) the Homeowner's Association permitted to be created pursuant to
the Declaration. Such an assignment shall relieve Buffehr Creek
Partners of liability so long as the assigned party assumes and
agrees to perform the duties set forth herein . The assignment and
acceptance of the assignment shall be evidenced by a written
agreement executed by the parties with reference to this Article
and recorded with the Clerk and Recorder of Eagle County, Colorado.
All utilities shall be placed in the Utility Easement
(including the Open Space) by the providers thereof acting for the
Owner to be benefitted thereby. Such Owner shall promptly pay for
all costs and charges of such utility providers and indemnify and
hold harmless the other Owner therefrom. No Owner is authorized or
granted any right to act as an agent of any other Owner and subject
such other Owner's interest in the Easement or his Lot to any
claims.
ARTICLE 9
COMPENSATION OF BUFFEHR CREEK PARTNERS
Buffehr Creek Partners shall not be compensated for
acting as a Manager for the Second Road, but it may engage a
Manager to perform ~ts duties hereunder and the Manager's total
yearly compensation for acting as the Agent for the Owners shall
not exceed the greater of Five Hundred Dollars ($500.00) or ten
percent (10%) of the yearly gross or budgeted assessments or such
other amount as mutually agreed upon between the Owners of the two
Lots. Such compensation is not to be included in the Owners'
liability specified in Section 7 hereof . No bond shall be required
of the Agent.
ARTICLE 10
ADVANCEMENT OF COSTS AND EXPENSES
The Manager may require the Owners of the two Lots to
advance their percentage share for the Second Road of reasonably
expected expenses or to create a sinking fund and hold the funds in
a segregated trust account for use by the Manager in paying the
costs and expenses authorized and incurred under this Second
Amendment to Declaration.
As the Manager requires additional funds from time to
time to pay the costs and expenses authorized and incurred under
this Second Amendment to Declaration for the Second Road, each
Owner shall deposit his percentage share of the sums required ,
subject to the limits of liability under this Second Amendment to
Declaration, in the Manager's Trust Account wi thin one (1) month of
receipt of notice from the Manager that such funds are required.
-13-
•
In the event that any Owner fails to pay the required
amount within one (1) month of the Manager requesting the same in
writing, such amounts shall become thereafter due and payable,
bearing interest at the rate of 24% per annum, include a late fee
of One Hundred Dollars ($100.00), and may be collected by suit
against the defaulting party by the other Owner , the Homeowner's
Association or the Manager for the Owners and which suit damages
shall incl ude costs and reasonable attorney fees for collection of
the Assessments. The interest earned and late fee shall be paid
over by the Manager to the non-defaulting Owner as liquidated
damages and not as a penalty.
In addition, any Co-Tenant against whom a judgment has
been obtained pursuant to this Article may b e denied by the other
Owner , via the obtaining of an injunction, the right of use of the
Second Road until the judgment has been satisfied.
This right may be enforced by obtaining an injunction
against the judgment debtor Owner and thos e taking through or under
him '(the judgment debtor Owner expressly waiving any requirement of
the other Owner to obtain a bond if required by such a proceeding)
from the Eagle County District Court, Colorado and all costs and
expenses, including reasonable attorney fees, shall be added to the
exist ing judgment against the Owner for obtaining and enforcing
such an order. The other Owner is expressly released from any
liability whatsoever to the debtor Owner and those taking through
or under him with respect t o the denial of such Owner's use of the
Second Road. Such debtorjCq~TenantjOwner shall indemnify and hold
harmless the other Co-TenantjOwne r from an y c laim of damage from
any party asserting a right to use the Second Road on account of
such parties legal relationships with the debtorjCo-TenantjOwner.
ARTICLE 11
ACCOUNTING BY MANAGER
The Manager shall furnish to the Owners of the Lots
written reports of maintenance and repairs undertaken, costs and
expenses incurred and receipts for the payment of costs and
expenses at least once p e r year.
ARTICLE 12
NOTICES
Any notice or report required under this Second Amendment
to Declaration shall be sent to the parties and the Manager at
their last known address, at the address they have directed or at
the address listed for such Owner of a Lot in the office of the
Treasurer of Eagle County, Colorado. Any required Notice shall be
made by regular mail, properly addressed with postage prepaid.
From time to time, but at not more than five (5) year
intervals, the Owners, the Manager or the Homeowner's Association,
-14-
\ •
shall file with the Clerk and Recorder of Eagle County, Colorado a
general Notice executed and acknowledged by all of the Owners an
Estoppel Notice advising at least the following and such other
information as the Owners may desire to make public: (1) the names,
addresses of the Owners; (2) any outstanding amounts owed by any
Owner on account of this Second Amendment to Declaration; and, (3)
the current Managers name, address and telephone number. The
Manager shall provide such information, in writing, to any Owner or
interested party, within ten (10) days, upon the request of an
Owner, for a fee to be determined by the Owners.
ARTICLE 13
PERSONAL INJURY AND PROPERTY DAMAGE LIABILITY
Any liability of the Manager or Owners for personal
injury to any workmen employed to construct the Second Road or make
repairs to the Second Road under this Second Amendment to
Declaration, or to third persons, as well as any liability of the
Owners for damage to the property of the Manager, or any such
workmen, or of any third person, as a result of or arising out of
construction, repairs, maintenance and restoration to the Second
Road under this Second Amendment to Declaration shall be borne as
between the Owners in the same fractions as they bear the costs and
expenses of such repairs, maintenance ~nd restoration.
The Manager shall have the affirmative duty to provide,
or have provided, workman's compensation insurance, builder risk
insurance and other like insurance to insure to the Owners
reasonably adequate insurance proceeds and the defense of any
claims. The premiums for such insurance shall be apportioned
between the Owners equally.
Any liability for the installation and repair of
utilities shall be the sole responsibility o f the Owner being
benefitted and it shall indemnify and hold harmless the other Owner
from any tort or contractual claims, including mechanic's liens, as
a result of such activiti e s.
The Owner's shall each keep and maintain general
liability insurance upon their respective Lo ts, including the
Easement as an appurtenance, in an amount and terms to be agreed
upon from time to time by the two Owners, but not less than One
Million Dollars ($1,000,000.00) for a single occurrence and each
Owner shall pay their own premium for such liability protection.
Each Owner shall cause his insurance company to agree to not
subrogate to any claims made under the policy against the other
Owner.
-15-
• '
ARTICLE ·14
INDEMNITY
Eac h Owner agrees to indemnify and hold harmless the
other Owner against all liability for injury to himself or damage
to his Lot when such injury or damage shall result from, arise out
of, or be attributable to any maintenance, repair or restoration of
utilities or to the Second Road undertaken pursuant t o this Second
Amendment to Declaration.
ARTICLE 15
REAL PROPERTY TAXATION
Any real property tax es assessed against the Easement
shall be divided between both of th e Lo t Owners as per their
prorata fractional ownership of the Easement . If Eagle County does
not assess the Easement as a separate taxation parcel, each Owner
shall timely pay all real estate taxes assessed against his Lot.
ARTICLE 16
EASEMENT TO RUN WITH EACH PLATTED LOT
The Easement shall run with each platted Lot being Lots
6/Tract C (when platted) and 7 , and shall be appurtenant thereto, a
burden and benefit ~o the platted Lot 7 and subsequently platted
Lot 6 serviced by the Easement, and shall be binding on and s hall
inure to the benefit of the Declarant, the Owners and their heirs,
successors or assigns. Unless agreed to by all of the Owners or as
otherwise set forth herein, n o Co-Tenant Owner may; (1) sever or
convey his interest in the Easement separate and apart from the
conveyance of his Lot; (2) or s ubdivide his interest in the
Easement; (3) or subdivide the Utility Easement from the Second
Road Easement; and, (4) any lien or encumbrance against a Lot shall
also automatically include the Owne rs undivided t en ant-in-common
interest in the Easement.
It is understood and agreed that the Easement purposes,
objectives and intents are: (1) the Second Road is to be used and
occupied to the maximum extent possible and consistent with good
traffic planning and traffic flow; (2) unl ess consented t o by both
Owners of the Easeme nt, the costs of the Easement are to be divided
equally among the two (2) platted Lot Owners; and (3) that
utilities shall be generally placed in the Utility Easement and
Open Space which is dedicated to the use and enjoyment of the
utility providers who shall be responsible and liable for their
actions within the Utility Easement and pursuant to th e common and
statutory laws of contract and tort .
ARTICLE 17
NO PARTNERSHIP OR JOINT VENTURE
-16-
• •
This Easement for the Owners of Lot 6 (when platted) and
Lot 7 as tenants-in-common and does not create, and is not intended
to create, a partnership or other joint venture between the Owners
of the two Lots and no third party beneficiary relationship with
any party has been created or intended unless specifically set
forth herein.
ARTICLE 18
LITIGATION
In th e e v e nt of any litigatio n wi th respect to this
Second Amendment to Declaration, all such l i tigation shall be held
exclusively in Eagle County, Colorado, District Court and the Court
shall award to the prevailing Lot Owner or Owners all costs and
reasonable attorney fees incurred.
ARTICLE 19
HOMEOWNER'S ASSOCIATION AND GENERAL MATTERS
1. Buffehr Creek Partners reserves the right to assign
and convey any duty or obligation of the Lot Owners set forth in
this Declaration to the Buffehr Creek Homeowner's Association, a
Colorado not for profit corporation that may be formed, by Buffehr
Creek Partners or the Owners of all o f th e Lo ts in the Lia Zneimer
Subdivision.
2. The Owners may, upon a majority vote of the Lot
Owners, assign and convey any -duty and obligation of the Owners set
forth in this Easement to the Buffehr Creek Homeowner's Association
so long as the Owner's remain liable for the ir prorata fractional
share of the Road costs.
However, and notwithstanding any other provision of
this Second Amendment to Declaration t o the contrary, in the event
the Hom e owner's Association is c reated and empowered by a majority
of the seven (7) Lot Owners to be assigned and undertake the
aforesaid duties, all costs and expenses for the First Road and the
Second Road shall be kept separate and divided and paid for by the
Lot Owners serviced by the Road and without contribution from the
Lot Owners of the other Road.
3. The obligations created by this Second Amendment to
Declaration may be enforced by any of the parties hereto, any Owner
of a Lot or interested party, or, at its option, the Town of Vail,
Colorado.
4. Buffehr Creek Partners reserves the right to amend,
modify, revoke or supplement this Second Amendment to Declaration
with the written permission of the Town of Vail but, without the
permission of any Lot Owner or those claiming by, through or under
such Owner: (1) so long as the Second Road Easement right of access
and cost sharing fraction is not affected and the Utility Easement
-17-
' •
right of access is not affected; and; (2) until Buffehr Creek
Partners has conveyed both of its 50/100 fractional interests in
the Easement via platting and sale of Lots 6 and 7. Thereafter ,
these Easement Covenants may be modified or amended with the
written approval of the Town of Vail and the written agreement of
the two Lot Owners.
This Second Amendment to Declaration is to be liberally
construed to carry out the intents and purposes of the Road and the
Utility Easement as set forth herein .
5. The liability of Buffehr Creek Partners hereunder is
limited to the construction of the Second Road and Utilities to the
Lots as per the requirements of the Town of Vail. Buffehr Creek
Partners or other entities may construct Dwellings upon Lots 6 and
7 as subdivided from Tract A and that their construction activities
will involve the movement of heavy machinery and equipment over the
Road. Such parties use of the Road for dwelling construction shall
not be subject to the Use Restrictions of this Easement or such
parties liable for wear and tear of the Road, unle ss such Use is
grossly negligent or intentionally damaging to the Second Road and,
in such event, such party shall be responsible to repair the Second
Road to the standard if such damage had not occurred.
6. The P~at of Lot 7 will contain a portion of the
Easement that will also service the planned Lot 6 (Tract C). It is
the intent and purpose of this Second Amendm e nt to Declaration that
Buffehr Creek Partners, when ~ots 6 and 7 are platted, shall,
concurrent and automatically with such platt i ng and wi thout
additional separate Easement Deeds convey one-half (1/2) undivided
tenant-in-common interest in this Easeme nt t o each of the Owner's
of the two Lots.
It is the intent of Buffehr Creek Partners that the total
Second Road and Utility Easement, in the shape of a "T" with the
north end of the "T" abutting the public way at Buffehr Creek Road,
shall be treated as a single Easement servicing the two Lots and
both Lots subject to these Covenants.
NEWLY CREATED LEGAL DESCRIPTION (CRS 38-35-106.5)
Lot 7 is a newly created legal description created by
Buffehr Creek Partners, a Colorado Limited Partnership and its
address is P.O . Box 305, Minturn, Colorado 81645 .
-18-
• •
Witness the hand of the DBclarant this ____ day of
October, 1994.
BUFFEHR CREEK PARTNERS,
a Colorado Limited Partnership
By: Zneimer Company, Inc., Gen eral Partner
By: ____________________________________ _
Edward J. Zneimer, President
STATE OF COLORADO
ss.
COUNTY OF EAGLE
ACKNOWLEDGED BEFORE ME, this day of October, 1994
by Buffehr Creek Partners, a Colorado Limited Partnership, by
Zneimer Company, Inc., General Partner, by Edward J. Zneimer, its
Pres'ident.
My commission expires: May 15, 1998
WITNESS my hand and seal this day of October, 1994.
George M. Straw, Notary Public
N:\ ... \ZNEIME R\LOT7\AMENDMEN .2ND
Octobor 24 , 1994
-19-
f
I
I I
I
f
I
I
I
I
f
~
r
\
I
-
Qt. ~ • • · ll!'~r-Mountain
.. Engineeringud.
Town of Vail
OFFICE COPY
,.
'
SOILS AND FOUNDATION INVESTIGATION
FOR
PROPOSED RESIDENCE
LOT 7, TRACT A, LIA ZNEIMER SUBDIVISION
TOWN OF VAIL
EAGLE COUNTY, COLORADO
PREPARED FOR:
MR. BRENT ALM
PROJECT NO. 94501G
JULY 6, 1994
Box No. 978 • Avon, Colorado 81620 • 94~5072 Denver 893-1531
1420 Vance Street • Lakewood, Colorado 80215 • Phone: 232-Q158
' I
.
J
I
I
I
J
I
I
I
li ~
I
• ~
I
I i
\ I
\
"' . . .,
,-
\ ...
\
. . .. ..... .
• •
TABLE OF CONTENTS
CONCLUSIONS 2
SCOPE 2
SITE LOCATION AND DESCRIPTION 3
SITE INVESTIGATION 3
SUBSURFACE AND GROUNDWATER CONDITIONS 4
PROPOSED CONSTRUCTION
EXCAVATION DIFFICULTIES
FOUNDATION RECOMMENDATIONS
SLAB CONSTRUCTION
GROUNDWATER AND DRAIN SYSTEM
REINFORCING
CRAWL SPACE COVER
BACKFILL AND SURFACE DRAINAGE
LAWN IRRIGATION
MISCELLANEOUS
LOCATION OF TEST PITS
SUMMARY OF TEST BORINGS
SUMMARY OF TEST PITS
SWELL-CONSOLIDATION
5
5
5
7
8
8
8
9
9
10
DRAWING NO. l
FIGURES NO. l
FIGURE NOS. 2-3
FIGURE NO. 4
DETAIL OF PERIPHERAL DRAIN SYSTEM FIGURE No.· .5
PIER DRAIN SYSTEM FIGURE NO. l
·---···---· ' ~ ·!··· · .. 0 . ;· .. :···
I
\
CONCLUSIONS
·SCOPE
• •
1. Subsoil conditions are non-
uniform over the site. Borinq No. 1
had 2 feet of topsoil over 14 feet
of clayey-qravelly SAND with
SANDSTONE rock fragments over 4 feet
ot SANOSTO~E bed:t'lock. Test Pit
No. 1 s 1 & 2 had 1 to 2 feet of
topsoil over 1 . foot of weathered
bedrock over more firm bedrock with
re~usal at 2.5 feet.
2 o The proposed residence should
be founded on undisturbed clayey-
qravelly SAND, or on undisturbed
SANDSTONE or SILTSTONE BEDROCK o SEE
FOUNDATION RECOMMENDATIONS S~CTION.
3. According to Ordinance No. 5 the
Official Maps for the Town of Vail were
reviewed. Based on those maps, Lot 7
is not classified as a Geologically
Sensitive Area.
This report presents the results of a Soils and Foundation
Investigation for the proposed residence to be constructed on Lot
7, Tract A, Lia Zneimer Subdivision, Town of Vail, Eagle County, ,-
Colorado. The investigation was prepared by means of test boring,
test pits and laboratory testing of samples obtained from the pits
and the borinq.
The purpose of this foundation exploration was to determine
the various soil profile components and the enqineering
characteristics of the foundation materials, and to provide
criteria from a geotechnical point of view 1 for use by the
structural engineers in preparing the foundation design, and the
.. ······ ·..:.~·r .. ""~·-'·-·-·-_ .. -·· ·.,,.., ~··· . '•. .. .... ' .. :· ..
•,t •• --·
• •
3
d~sign engineers and architects in preparing grading and drainage
plans.
SITE LOCATION AND DESCRIPTION
The building site is located just south from the abandoned
old pond near the southwest corner of the Lia Zneimer Subdivision
in the Town of Vail, Eagle County Colorado. The topography of the
lot is fairly steep. The vegetation consisted of aspens and grass
south from the bank of the abandoned old pond with p~ne forest
continuing on the steep slope. Bedrock outcroppings were visible
throughout the site. Drainage is to the north and northwest. The
lot is vacant.
: SITE INYESTIGATION
The field investigation performed on June 29 and July 5, 1994
consisted of drilling 1 test boring and excavating, logging and
sampling 2 test pits. The locations of the test boring and test
pits are shown on Drawing No. 1. ,.
The test pits were excavated a conventional backhoe. The test
boring was drilled with a 4 inch diameter continuous flight power
auger. Summaries of the test pits and boring logs are detailed on
Figures No. 1 -3.
Laboratory samples from the boring were obtained at selected
intervals by advancing a California sampler into undisturbed soil,
:, by a 140 pound hammer falling 30 inches.
These samples were returned to our laboratory, inspected and
. ... i • ..... , .,. ':' 7·.' ........
... ,,, ..... --·
• •
classified in accordance with the unified Soil Classification
system and the boring and test pit logs were edited as necessary.
To aid in classifying the soils encountered, and to determine
general soil characteristics, selected laboratory tests (moisture
content, unit weight, swell/consolidation), were per formed on
representative soil samples. Summaries of the test results are
shown on Figure No. 4
SUBSUBPACB AND GBOUNQW)TEB CONpiTIONQ
Refer to the summary of test boring and the test pits, Figures
No. 1 -3. Subsurface condi tiona are somewhat erratic. Boring No.
1 had 2 feet of topsoil over 14 feet of clayey-gravelly SAND with
· SANDSTONE rock fragments over 4 feet of SANDSTONE bedrock. Test
·Pit No.•s 1 & 2 had 1 to 2 feet of topsoil over 1 foot weathered
·bedrock over more firm bedrock with refusal at 2.5 feet.
We understand that no overlot grading has been done prior to
this investigation.
,. No Groundwater was encountered in any of the test pits or the
boring at the time of drilling and excavation.
According to Ordinance No. 5, Section 5, Chapter 18.69 of the
Vail Municipal Code the following Town of Vail Official Maps were
reviewed:
1.) The debris flow and debris avalanche hazard analysis map
prepared by Arthur I. Mears, P.E., Inc. and dated November 1984 .
2.) The rockfall map prepared by Schmueser and Associates,
Inc. and dated November 29, 1984 •
_. ___ _:. ............. ~. . . .. . ...
I
I·
I .
I
I.
• ••
Lot 7, Lia Zneimer Subdivision is not classified as
Geologically Sensitive Area based upon above maps.
PROPOSED CONSTRUCTIOU
No specific design data has been provided, but for the purpose
of this analysis, it has been presumed that the proposed residence
will consist of 2 floors without a basement, and that loads will be
light. If the proposed project differs significantly from this
understanding, a review should be made after the plans are more
complete.
'. EXCAVATIOU DIFFICULTIES ,.
Hard SANDSTONE bedrock was encountered during our
· investigation. Often times blasting is necessary during excavation
in this rock.
lOONpATION RECOKMENQATIONS
Clayey-gravelly SAND with SANDSTONE rock fragments and
weathered to firm SILTSTONE and SANDSTONE bedrock will be
encountered in the foundation excavation. Due to the different
engineering properties of the clayey-gravelly SAND and 'the firm
bedrock it is not recommended to place the footings on both soils.
In order to reduce the potential for differential settlement the
:· following two alternatives for foundation are recommended:
I
I ·
f
'
• •
.§.
1.) Place all the footings on bedrock, meaning on the
hillside where the bedrock is very close to the ground surface
spread footings or wall on rock designed for a maximum allowable
soil bearing pressure of s, 000 psf can be used; while on the
moderate slope near the abandoned old pond where the depth to
bedrock is greater, straight shaft piers designed for end bearing
pressure of 10,000 psf and ski n friction of 1000 psf can be used.
2 .) As a second, less desirable, alternative the proposed
residence can be founded on spread footings designed for a maximum
allowable soil bearing pressure of 3,000 psf. The footings should
be founded on the undisturbed clayey-gravelly SAND with angular
rock fragments. Where shallow bedrock is encountered, the rock
I should be overexcavated a minimum of 3 feet and replaced with
: structural fill consisting of clayey-gravelly SAND.
............
The footing excavations should be relatively smooth, free of
debris, organics, loose soil, frost, and standing water. Any over-
excavations should be backfilled· and compacted to . 100 percent
with ~n 2 percent of optimum moisture as determined by a Standard
Proctor Test (ASTM D-698). A representative of this office should
be contacted to inspect the foundation excavation and the drilled
pier construction to verify that the soi l conditions are the same
as those anticipated in this report.
Afte r all of the final grading is completed, the bottom of the
footings should be covered with a minimum of 48 inches of backfill
for frost protection.
Voids left by the removal of cobbles in the bottom of the
----...;....~"-. .-
• •
2
footing excavation should be filled with lean concrete or a
granular soil with a maximum particle size of 3 inches compacted to
100 percent of Standard Proctor Density (ASTM D-698), within 2
percent of optimum moisture.
SLAB CONSTRUCTION
All excavations made for the foundations under proposed slab-
on-grade areas must be properly backfilled with suitable material
compacted to a minimum of 95 percent of the maximum Standard
Proctor Density (ASTM D-698). The on-site soils, exclusive of
topsoil and organics are suitable for use as backfill. Before the
backfill is placed, all water and loose debris should be removed
!rom these excavations.
Prior to the construction of concrete floors, the undisturbed
subgrade, free from topsoil and organics, should be proof compacted
with a loaded rubber-tired loader to a uniform high density.
Special care should be taken in areas where underground utilities
have;been installed.
The floor slabs should be reinforced, and joints should be
provided at the junctions of the slab and the foundation walls, so
that a small amount of independent movement can occur without
causing damage. The slabs should be scored in accordance with the
American Concrete Institute's recommendations to control cracking.
A granular mat (-3/4 inch gravel, with less than 5 percent
~-passing No. 200 sieve), should be provided below the floor slabs.
This should be a ·minimum of four inches in thickness. The purpose
..... ' ---.~ .. _ .. __
•
• •
of this granular mat is to provide a capillary break between the
subgrade and the slab.
GROUNDJATEB AND PBAIH §XQTEK
While no ground water was encountered at the time the field
investigation was conducted, it is possible that seasonal
variations will cause fluctuations, or for a water table to be
present in the upper soils during the spring months, or after
prolonged periods of rain. A foundation perimeter drain for spread
footings as detailed on Figure No. 5 and for drilled piers as
detailed on Figure No. 6 is recommended to reduce the risk of
surface water infiltrating the footing subsoil~.
. REiliJOBCING
The foundation should be well reinforced and rigid enough to
withstand differential se~tlements. Foundation walls retaining
earth should be designed to resist an equivalent fluid pressure of
45 P,Cf for an "active" case assuming a level drained backfill
condition.
CBAJL SPACE COYER
When moist soils are encountered in the excavation, the ground
surface in crawl space areas should be covered with an impervious
moisture barrier sealed against the footings. This will help to
11 :· reduce humidity in the crawl space area. The crawl space should be
vented.
-~·-·
' . • •
BACKFILL AHD SQRlACB DBAitiAGB
The backfill placed around the foundation walls should not
settle excessively after completion of construction and the top one
foot of the backfill material must be relatively impervious. The
on-site soils exclusive of topsoil and organics are suitable for
use as backfill.
Backfill should be moistened or dried to near its optimum
moisture content and compacted to at least 90 percent of the
maximum standard Proctor Density. Structural backfill should be
compacted to at least 95 percent of the maximum Standard Proctor
Density.
Surface water running toward the structure from upslope areas
' should be diverted around and away from the building by means of
drainage swales or other similar measures.
The final grade should have a positive slope away from the
foundation walls on all sides. A minimum of 12 inches in the first
10 feet is recommended. Downspouts and sill cocks should discharge
into,splash blocks that extend beyond the limits of the backfill.
The use of long downspout extensions in place of splash blocks is
advisable.
LAIN IRBIGATION
Do not install sprinkler systems next to foundation walls,
porches or patio slabs. If sprinkler systems are installed, the
sprinkler heads should be placed so that the spray from the heads,
under full pressure, does not fall within five feet of foundation
... '.t •
..
'
• •
walls, porches or patio slabs. Lawn irrigation must be controlled.
If the future owners desire to plant next to foundation walls,
porches or patio slabs, and are willing to assume the risk of
structural damage, etc., then it is advisable to plant only flowers
and shrubbery (no lawn) of varieties that require very little
moisture. These flowers and shrubs should be hand watered only.
MISCELLMEOtlS
The recommendations provided herein are based on experience in
the area and from the on-site field exploration. The information
obtained form the field exploration and laboratory testing reflects
subsurface conditions only at the specific locations at the
· particular times designated. Subsurface conditions at other
locations and times may differ from the conditions at these
locations. The extent of any variations between the test pits and
borings may not appear evident until excavation is performed.
However, only minor variations are expected. If during
cons~ruction conditions appear to be different, this office should
be advised so re-evaluation of the recommendations may be made •
-----~·--::.. . · . .:~..:.. . ··. -·-· ·. ,·, r ..... -·:t."',"-"-;:·
,.
'
• • ll
This report has been prepared for the exclusive use of Mr.
Brent Alm tor the specific application to the proposed residence
structure to be located on Lot 7, Tract A, Lia Zneimer Subdivision,
Town ot Vail, Eagle County, Colorado.
The findings and recommendations of this report have been
prepared in accordance with locally accepted professional
engineering standards for similar conditions at this time. There
is no other warranty, either expressed or implied.
Sincerely,
INTER-MOUNTAIN ENGINEERING, LTD.
Luiza Petrovska, P.E.
Project Engineer
Reviewed by:
---___ . _ _:·..:.:
"
'
,.
ORA'M-4 BY:
__ ._,_\ ·--·---·-·· ; -
·Pit #2
81 LOT 7
@
LO CATION OF TEST PITS
PROPOSED RE9DENCE
Lot i: Troct A. Lio Zneimer Subdivision
To wn of Va il, £ogle County, Colorado
Prepared for:
Mr. Brent Aim
Pit #1
• 1\
NO.: 94501G
L.P. SCALE: AJ 1 H = 20' DATE : 7-6-94 ORAWINC NO.: 1
. . . .... --~.-·• '-·' • .. :_ .. : I' .. t ''"'' :•1;,;, ••, . .;,..• --
5
10
15
26
• BORING NO. 1 •• DATE DRILLED: June 29, 1994
ELEVATION:
Iopaoil
Brown to reddish brown,
t.:~~({j~~l~~~ clayey-gravelly SAND
20112 ~ with SANDSTONE rock fraaments
SANDSTONE Bedrock
Bottom of Borin& No Groundwater
Encountered
It Relatively undi5turbed 5ample
SUMMARY OF TEST BORINGS
PROPOSED RESIDENCE
Lot 7, Troct A, Lio Zneirner Subdivis ion
Town of Vo1Y
IJ' -10. 9,.
!o\ • 120.3 pcf
Lit" -15.5,.
'( ~ -119.5 pcf
• k
,AOJECT NO .: 9450lG
£ogl e County. Colorado
Prepored for: Mr. Brent Aim
----,-----------------~--------------------FtCURE NO .: l
____ ._ .. :,_r ·..;_· --·-', ...... ······
.. ~-···
.... . . • ·-·-
•••• 0
'
-
-.A
-----. -
5 --....
-------
10 -----,'
-----
,15· •
Lot
• PIT NQ 1 •
Li&ht brown, weathered
SILXSl'ONE and SANDSl'ONE " ...
II SILISl'ONE Bedrock
Refuaal at 2.5 feet
on Bedrock
0,. W.t.T(IIIIAI.
I
Bedding parallel
to slope
No Groundwater
Encountered
'
I I
Bulk aample
SUMMARY OF TEST PITS ·-
PROPOSED R£5/0ENC£
7. Troc t A, Lio Zneirner Subdivis i on
To wn of Vo1l
• .J&_
P'IIIO.Itt'T liO..a 9450lG
£ogl e County, Col orado
Prep ared for: Mr . Brent Aim ,_ _____ .......;;.._--r ___ ._;_~....;;.;,.;~:....:..:.:...:...:..-.. -
1 I ! :
fiGUIIIt liO.' 2
... · .. ;'. ·-· ... , .. ,. :~-........ ·.·
PIT NO. 2 •
... -. . ···-··
..
. !, . ..;_
. ··· .. . ..
'
--.
---
. -
5 --.....
--.
----
10 • -----·----
15
•
SILTSTONE Bedrock
• -Refulal at 2 '.5 feet
on Bedrock . -
·,-
• Bulk sample
Lot
SUMMARY OF TEST PITS
····-
PROPOSED R£SID£NC£
/, Troct A, Lio Znei'mer Subdivision
Town of Vot'l
[ogle County, Colorado
t-------.:r...:,r.epored for: Mr . Brent Aim , .. I I
'='. · •. ·. :··:~ ...... ~ ... · . . .. :~·.: ...... .
... ~' ........ .. . .. . --
IUT[IIIAI.
T I
Rock beddin& parallel
to llQpe
No Groundw.ter
Encountered
r r
P'JIO.I[CT 110.1 94501G
"GUilt NO.• 3 •
.:. .. :;...:.."..
l
" '
• r'l':. !\0. 1
DEPTH 5 ,
-~ 0
..J
..J .•
LLJ s: ·l
V)
I
z -2 0
I~ !'-.... r-
~ ~
~
0
..J
0
V) z
0 u
0.1 1.0 LO.C.D IKSFI
SAMPLE OF cllyey·gnvelly SAND NAT. \IOISTURE CONTENT · 10.9 '\
% SWELL/CONSOL.. S.t.lo'.PLE fLOODED AT~KSF NAT. DRY DENSITY 120.3 PCF
?it 1\o. l
DEPTH 10'
0
~ -l -
..J
..J
LLJ -2 3:
V)
I
z
~ "--...... ..:.._
r-f-"i~ '-....... 1'--.
0
~
0 " _, .
..J
0
V) z
0 u
o. 1 1 .0 LO.C.D IKSFI 10 100
SAMPLE OF clayey·aravelly SAND NAT. MOISTURE CONTENT._..-1-s ..... s ___ 'IO
% SWELL/CONSOL. ______ S.t.MPLE fLOODED AT.2..:.£_KSF NAT. DRY DENSITY_l1_9_._s ___ PCF
SWELL -CONSOLIDATION TEST RESULTS --···------·
PROPOSED RESIDENCE
Lot 7, Troct A, Lio Zneimer StJbdivision
Town of Vat~
£agl~ County, Colorado
t--------Prepored for: Mr. Brent Aim
• .L
rt~OJ t CT ~O 94501G
l ·:..... ;·'j:.·· ....
' ·:: ., •• 0 :\=·:~ <'.~ .• : :
. . ..
~-~·
. •, . . . !:,\.. · .. :
• I
I
I \
••
I · .. , ... ::·-. · .. :-
• •
TOP ONE FOOT OF BACKFILL
SHOULD BE RELATIVELY
IMPERVIOUS FILL. SLOPE
AWAY FROM BUILDING.
POLYETHELENE MOISTURE
BARRIER GLUED TO FOUNDATION
WALL.
MINUMUM OF 6 11 OF
314 INCH. GRAVEL
4"·DIAMETER PERFORATEO RIGID "
·PIPE SLOPED A MINI MUM OF 1/8
PER FOOT TO SEWER LATERAL SUBDRAIN
SUMP PUMP OR 04YLIGHTEO.
DETAIL OF PERIPHERAL DRAIN SYSTEM
FOR FOOTING TYPE FOUNDATION
Figure : __ s ___ _
----PROPOSED RESIDENCE
Lot 7, Troct A, Lio Zneimer Subdivision
Town of Vo1~
· ... ·.
£ogle County , Colorodo
Prepored for: Mr. Brent Aim
Project No. 94501
'· I
., ,.
'. I,
I
FOUNDA TION WALL
-BACKFILL --
Co
: "' ~~ .......
t;;~
l:S'l. -...J~
f.....~
"'a
:--J -~
STRAIGHT SHAFT
Lot
ORA'M-1 BY: L.P.
L -
POL Y£TH£L£N£
MOISTURE BARRIER
CLUED TO FOUNOA TION
WALL
PIER DRAIN SYSTEM
PROPOSED RESIDENCE
7, Troct A, Lio Zneimer Subdivision
Town of Vat~
[ogle County, Colorado
Prepared for: Mr. Brent Aim
SCAt.(: ""' 1" = 100' OAT£: 7-6-94
MIN OF 8"
CLEAN, WELL
GRADED SAND
AND GRAVEL
4 II PERFORATED PIP[
SLOPED TO A SUMP OR
OTHER SUITABLE OUTLET
• k
PROJECT NO .: 9450JG
FIGURE: NO .: 1
i----~--------~--~----------~-·'
.ign Review Action Ftltn
TOWN OF VAIL
Category Number ltfl, .A/.tw ~e (SfK)
. o ·I
Project Name: Zn e 1t11er )\ ~fttl(J/1(("_
Date -~r:,=---___..:1~~:.___-~If+----------
Building Name : ---'-"/J--'-/-'-,1--------:---------------------
Project Description : tti/./W ~ lr11f\ / P /:t j.4t 1 /'t
./ I
Owne r, Address and Phone : llt&W i. y f' y pf k .thr ~ er <"-EJ hfei #~ !r ri. • fro y ~()~
IF/In 7-C! r/!1 , r 7fJ R/6Lf.( .:11 327-1//0 I , , ,
r 1
Architect/Contact , Address and Phone : ?f;=p~f l!l11t & .tbv ~II t/:n/ ((; X /~s-8
-::# J"'J7-tNt~ 0 / I / I
fi7Jrf 11 I / 1
Legal Description : Lot 7 -Biook-fT Subdivision Ltor ?t1f I t11 f V' Zone District ~
Proje ctStreetAddress : /7;u !"trJbiJDJ'>tA!'Ffl) '?u{{I'J~" ~otJJ fcf
/ " -
1 ;! Board I Staff Action
Motion by: h~f.L//1 'eoJ.JJA/'~ vote: 4(_ 11
Seconded by:_f+JkT:;-'--', .'-'-:;-'?-:S;:'"""':L:.;:c:~~/;w"--"L!c."--'-/!.="' ___ _ _ ____o___:_;__ ________ _
, v
~Approval
0 Disapproval
0 Staff Approval
Condition s: ---;-=--/---~;-----:;------;7-~""'-:---------:-----:7-:---;-;-----------
/ 'i c~k/ /t5rl d (J, Fllrn/foff"
Town Planner
Date: / e-/0 ,-9t; r 1
()
ORB Fee Pre -paid _-=t2:....:.'1!..=....:71~~-~-------r
G--
• •
June 15 , 1994 DRB Conditions of approval for Lot 7, Lia Zneimer Subdivision:
1.
2 .
3 .
4 .
Hydrologic and hydraulic study to be submitted to Community Development by a
qualified engineer to address vacation of a portion of the drainage easement where it
overlaps the building envelope on Lot 7 and realignment of drainage easement to
include culvert pipes under the common driveway to Lots 6 and 7 .
. /ac_ q r i) Commonlctriv~Way cross slope to be reduced and culvert pipe extended up-valley to
lessen steepness of fill slopes .----;(af<J ~ a~ .2'::!(
Pond to be engineered to pass one hundred year frequency flood. Engineer design
and landscaping plan to be subm itted for ORB review and approval prior to issuance of
a Temporary Certificate of Occupancy for residence.
Limits of disturbance to be surveyed and snow fence to be installed on limits prior to
issuance of building permit. Fencing to remain up until final site grading and house
construction is complete.
5. Exterior lighting plan and fixture details to be submitted for Community Development
review and approval prior to building permit issuance.
6 .
7.
Prior to recordation of the single family subdivision that will define Lot 7 as a separate
parcel , the applicant shall complete the necessary procedures for amending o~
vacating the recorded access and drainage easements for the Lia Zneimer Subdivision
to reflect current access and drai nage conditions .
Single family subdivision for Lot 7 to be platted and recorded once foundation poured. (!rt of' ~ r&J)
..
<.,<.OW
·. IJ {1> !J' -j... • .evised 9/4/91 ~' . t,~ DRB APPLICATION -TOWN OF VAIL, COLORADO
/ -;:?! ( ;i\Q_ cJ"' ()'> ( DATE APPLICATION RECEIVED: ~"'( 2~' \4"14--
r J" t . ~ ~. DATE oF DRB MEETING: JuNE' ~tf"f94 'YJ!WI
)
£~jn' ********** ,U
b ~ \~}JL THIS APPLICATION WILL NOT BE ACCEPTED ~-.\'
-\" UNTIL ALL REQUIRED INFORMATION IS SUBMITTED MAY 2 3 1994
I.
**********
PROJECT INFORMATION: .,=--]lV_:£,U.vW1. DEV. DEPI
A. DESCRIPTION·: "51 N4Lt= 'PAH \L'\ ,-"\..~\~L""'-
B. TYPE OF REVIEW:
~New Constr~ction ($200. 00) __ Minor Alteration ($20. 00)
___ Addition ($50.00)
C. · ADDRESS:
__ Conceptual Review ($0)
D. LEGAL DESCRIPTION: Lot T -Bloc~ ~T ~
E.
Subdivision \..\~ Z"-\l?i~61e. ~\V'l~DN
If property is described by a meets and bounds legal
description, please provide on a separate sheet and
attach to this application.
ZONING:
F. LOT AREA: If required,. applicant must provide a current
stamped survey showing lot area. --·-~--~~---·-----------
G. NAME OF APPLICANT: ~0 'Z+...I1T lMe=-12-
Mailing Address: toO}( "30~, MI~-J'D/1Z.N , CO· .~1~4-S
----------------------------Phone ~'2-r -4 101
H. NAME OF APPLICANT'S REPRE SEN TATIVE: ~~ }:.Ll-1, All\
I.
J.
K.
Mailing Address: P·O· &ox~ 1\ . V~\1... 2:>\liSB
-------------------------------Phone ~'l. 't · q "'c;,a
Condominium Approval if applicable.
DRB FEE: DRB fees, as shown above, are to be paid at D 1
the time of submitt al of DRB application. Later, when ~d' ·
applying for a building permit, please identify the ~~~
accurate valuation of t he proposal. The Town of Vail U l v~l
will adjust the fee according to the table below, to J1 1~d
ensure the correct fee i s paid. $ ~~~ i1@Ju}\l I
FEE PAID: -v; I
FEE SCHEDULE:
VALUATION FEE ·
$ 0-$ 10,000 $ 20.00
$ 10,001 -$ 50,000 $ 50.00
$ 50,001-$ 150,000 $100.00
$150,001 .-$ 500,000 $200.00
$500,001-$1 ,000,000 $400.00
$ Over $1,000,000 $5 00.00
· * DESIGN REVIEW BOARD APPROVRL EXPIRES ONE YEAR AFTER FINAL
APPROVAL UNLESS .. A A_BUL-LO.ING -·PERMIT -IS-· ISSUED AND -CONSTRUCTION IS
STARTED.
**NO APPLICATION WILL BE PROCESSED WITHOUT OWNER'S SIGNATURE
~--·
1
II. PRE-APPLICAT, MEETING: •
A pre-application meeting with a member of the planning
staff is strongly encouraged to determine if any additional
application information is needed. It is the applicant's
responsibility to make an appointment with the staff to
determine if there are additional submittal requirements.
Please note. that a COMPLETE application will streamline the
approval process for your project.
III. IMPORTANT NOTICE REGARDING ALL SUBMISSIONS TO THE DRB:
A. In addition to meeting submittal requirements, the
applicant must stake and tape the project site to
indicate property lines, building lines and building
corners. All trees to be removed must be taped. All
site tapings and staking must be completed prior to the
DRB site visit. The applicant must ensure that staking
done during the winter is not buried by snow.
B. The review process for NEW BUILDINGS normally requires
two separate meetings of the Design Review Board: a
conceptual approval and a final approval. Applicants
should plan on presenting their development proposal at
a minimum of two meetings before obtaining final
approval.
C. Applicants who fail to appear before the Design Review
Board on their scheduled meeting date and who have not
asked in advance that discussion on their item be
postponed, will have their items removed from the DRB
docket until such time as the item has been
republished.
D. The following items may, at the discretion of the
zoning administrator, be approved by the Community
Development Department staff (i.e. a formal hearing
before the DRB may not be required) :
a. Windows, skylights and similar exterior changes
which do not alter the existing plane of the
building; and
b. Building addition proposals not visible from any
other lot or public space. At the time such a
proposal is submitted, applicants must include
letters from adjacent property owners and/or from
the agent for or manager of any adjacent
condominium association stating the association
approves of the addition.
E. If a property is located in a mapped hazard area (i.e.
snow avalanche, rockfall, flood plain, debris flow,
wetland, etc), a hazard study must be submitted and the
owner must sign an affidavit recognizing the hazard
report prior to the issuance of a building permit.
Applicants are encouraged to check with a Town Planner
prior to DRB application to determine the relationship
of the property to all mapped hazards.
F, For all residential construction:
a, Clearly indicate on the floor plans the inside
face of the exterior structural walls of the
building; and
b. Indicate with a dashed line on the site plan a
four foot distance from the exterior face of the
building walls or supporting columns.
G. If.,DRB .appl:o~es.~ths-app.licat.io.n~.with-coo<iitions or
modifications, all conditions of approval must be
resolved prior to Town issuance of a building permit.
2
•
..
/ LI§T OF lfAIIjRIMcS
,··,NAMB.OF PROJECT: .f'fet}~· ~C~-..
' LEGAL .DESCRIPTION: LOT...1_ B~T.!f!9:1rSUBDIVISION l..olh 'Z+Jf1M~
,/ STREET ADDRESS: ---------------------
l DESCRIPTION OF PROJECT: ~\~tr.4 ~~ l.\( !fl \Yi?ft:JZ..f
The following information is required for submittal to the Design
Review Board before a final approval can be given:
A.
B.
. . ' .
BUILDING MATERIALS: TYPB,. OF MATERIAL COLOR
Roof $t"""\.e' C.lo\oMILC.O '-" ~~
Siding ~\.l.\..e" PPflt'-~
Other Wall Materials '!:I"TQJeo \l'eto.lel! L ~ ... P«-e-
Fascia Ill'& c.e'Ofe: 011" ~~
Soffits l'tC.. TiO C~l. ~"('
Windows c:.~ ~·~toft>
Window Trim ~u.-f-& eE=Qte Pf!'* diRt=CN
Doors C:.l.l\'0 ~" 'ttiSCPIN ~
Door, Trim ND"-\e"
Hand or Deck Raila
Flues c:Dffle
Flashings (;,Df,., ...
Chimneys ~'lft.lfl'fL. Vt\OK fl«,.F
Trash Enclosures '·
· Greenhouses
Other
LANDSCAPING: Name·ot Designer:
PLANT MATERIALS:
PROPOSED TREES
~~ ~
"D..s
Phone:
Botanical Name Common Name Quantity Sizt*
PINy'!:» l'ttJP!Intr Bwol'l!otiA-f\t:Jf WliC# I#·&'
Plwll'!. ~ · -'!JIJ.I'cj.!N!=M' ~ Y-c!»'
f!NL'! fOtJT'!t!tc\..ft> fcgfy MltJ,flfdt l"-:z.•Q.&..
AC.fe !JfiGuNF!O lrqu a Meef f 0 '2.•c,-~.
EXISTIN~S TO BE OVED
. c;~
.,!ChEf» CWN!cAJWMW• #\'2 5"-'L..
PPu~ Gti'JfM'Ir -~klf1!'F' f l'Z. SGA~ •
-~~"'f9&vs 'SMMI'IJ\' ~ JutJm 4t2-~.
*Indicate caliper for deciduous trees. Minimum caliper for
deciduous trees is 2 inches. Indicate height for coniferous
trees. Minimum height for coniferous trees is 6 feet.
' ,. ·,. .
•0' -·· ..... ' .... I,., ....... ,, .. , .... iMaoll~r'· .. ~ .. , '•;,.,. ... ~-.. _,...·~··f ............. ofo ,; , , .. , •,'
....
. '.
7 . . '
·-• .. -· --·
'' '~···
··I r., .. '·.
·:..;..,.;.·
c.
D,·
______ ... rx-="=xr= ... ""l¥ xununuu ~x-n'W yuanx~'t.Y ,
EXISTING SHRUBS ·
TO BE REMOVED
;·,,: -·t--~.' t ... '.
*Indicate size of proposed· shrUbs.
5 gallon.
Minimum size of shrubs is
GROUND COVUS
SOD '
SEED
TYPE
OF IRRIGATION
..r··~ . ' .-·.
' ·"
W\.~~/~s ~
t~tze.\W0f1))
Square Footage
TYPE OR ~THOD OF _H'_·V_Ifi_VJ.......,/_W_l_W)_~ _ _.....-../~--.;.;,;;.;-..S -~._,._ __
EROSION CONTROL ti'<OU _. $~6'0
.,
LANDSCAPE LIGHTING: If ·exterior lighting ia· proposed; please
show the number of fixtures and locat~ons on a separate
lighting plan. 'Identify each fixture from the lighting plan
on the list below and provide the wattage, height above
grade ~nd ~ype _of light pro.p.~_s,,_~ •. ,, .... ... ,: ' ' . . ..
t'0'!if": Pfef0Sf2 . ~ ~-·.
OTHER LANpSCAPE FEATURES (retaining walla, fences, swimming
pools, etc.) Please specify. Indicate heights of retaining
walls. Maximum height of walls within the front setback is
3 feet. Maximum height of wal~s elsewhere on the·property
ia 6 feet. .. · · ·
'l' ~ 4' e®~ !fO':t!~INc.. .. m. PkAtd •.•• 0
8
' .
·------·----·-·
SUBDIVISION
~ITY LOCATION VERIFICATi dllt
L.\,1>-"2.-W€-IM~ ~DI~
JOB NAME
LOT 1--:r 13LOCK ~ ~
ADDRESS
The location and availability of utilities, whether they be main
trunk lines or proposed lines, must be approved and verified by
the following utilities for the accompanying site plan.
Authorized Signature
U.S. West Communications
1-800-922-1987
468-6860 or 949-4530
Public Service Company
949-5781
Gary Hall
Holy Cross Electric Assoc.
949-5892
Ted Husky/Michael Laverty
Heritage Cablevision T.V.
949-5530
Steve Hiatt
Upper Eagle Valley Water
& Sanitation District *
476-7480
Fred Haslee
NOTE: 1. This form is to verify service availability and
location . This should be used in conjunction with
preparing your .utility plan and scheduling
install ati ons .
2. For any new construction propo sal, the applicant
must provide a completed utility verification
form.
3. If a utility company has concerns with the
proposed construction , the utility representative
should not directly on the utility verification
for m that there is a problem which needs to be
resolved. The issue should then be spelled out in
detail in an attached letter to the Town of Vail.
However , please keep in mind that it is the
responsibility of the utility company to resolve
identified problems .
4. If the utility verification form has signatures
from each of the utility companies, and no
comments are made directly on the form , the Town
will presume that there are no problems and that
the development can proceed.
5. These verifications do not relieve the contractor
of his responsibility to obtain a street cut
permit from the Town of Va il , Department of Public
Works and to obtain utility locations before
digging in any public right-of-way or easement in
the Town of Vail. A building permit is not a
street cut permit. A street cut permit must be
obtained separately.
* Please bring a site plan, floor plan, and elevations when
obtaining Up.per--Eagla-.N"aJ..l.ey , Watec .&r-Sa.nita:t.ion--.signat.ures. Fire
flow needs must be addressed.
9
• ZONE CHECK •
FOR
SFR, R, R P/S ZONE DISTRICTS
DATE:
LEGAL DESCRIPTION: Lot 'f_I __ ~_A_ Filing L\.IAt 'ZNE=-tM~~.
ADDRESS:
OWNER (;"0 · ~M<Yt
ARCHITECT ~1'2-EN\ f.LM / Al A
PHONE _eJ2_'f_. _E#-_4_l O_I __ _
PHONE _e_?.._r_--~-[I)_Sc> ___ _
ZONE DISTRICT ~l0tw11~ CLVSre:e
PROPOSED USE
**LOT SIZE
Height
Total GRFA
Setbacks
~I t-J?o \.. e:-"F~ l \.)-( ~ .
.'80~.
Allowed
(30) (33)
+ 425 = ___ _
-----+ 425 = ___ _
Front
Sides
Rear
20'
15'
15'
E x isting Total Proposed
~-l.o\1
_4~
Water Course Setback (30) (50)
Site Coverage
Landscaping
Retaining Wall Heights
Parking ·
Garage
Drive:
View Corridor Encroachme n t:
3' I 6'
d,s Re q rd ~~
(3 0 0) ~ (900 ) (120 0 yG cm (r~ uJel)
~-~~Q Permitted Slope 8 % Actual Slope
Date approved by Town Engineer :
Yes No ~ ???
Flood Plain «/A--
2) Percent Slope ~.riA-
3) Geologic Hazards
a) Snow Avalanche ________ _
b) Rockfall
c) Debris Flow
4) Wetlands 1(1~!~----------------------
P r e viou s conditions of approval (check property file) : ~--------
Does this req~est involve a 250 Addition?
How much of the allowed 250 Addition is used with this request? ----
**Note : Under Sections 18.12.090(B) and 18 .13.080(B) of the Municipa l
Code, lots zoned Two Family and Primary/Secondary which are less than
15,000 sq. ft. in area may not construct a second dwelling unit. The
Co mm unity Development Departme n t may grant an exception to this
restriction provided the applicant meets the criteria set forth unde r
Sections 18.12.090(B) and 18.13.080(B) of the Municipal Code including
permanently .restri..ct.in~ t.he. unit _as .... a ... .Long.::t.erm .. .r:.ental .. unit for full-
time employees of the Upper Eagle Valley.
10
1. PHASE :IZ[ 1701 FILING NO.2 TOWN OF VAIL
BO
U
N
D
A
R
Y
TRACT A PHASE :11: LION'S RIDGE
FI
L
I
N
G
NO
.
3
A RESUBDIVISION OF
PA
R
C
E
L
S
B,
C
,
E
,
8 PART OF D, LION
'
S
RI
D
G
E
FI
L
I
N
G
2
CO
L
O
ST
R
E
A
M
53
40
12
0
0
• T R u c T u R [
A R C M T t C T U R r l A N N G
1 9 June. 1 '1 '14
To: Randy Stouder
Town Planner. Town of Vall TO V · CU1v jvi. DE V. DEPT.
RE: Re-submittal of plans for DRB
Lot •1, Lia Zneimer Subdivision
Dear Randy :
I wanted to highlight the changes I have made In response to the DR6 meeting
June 1 and to your letter dated June 9. 1 '1 '14.
Y'le have made the following changes:
1. Y'le have changed the shingle clad exterior wall to a board 4 batten
siding ( 1 x 1 O's with 1 x 2 battens) .
.2. Y'le have changed the large scale eyebrow dormer to a dormer
that matches the other gabled dormers.
9 . Y'le have changed the smaller 'accent' eyebrows to flat-arch
dormers which match the other flat-arch windows. The use of the
gabled dormers in those locations made them to much of a 'feature'
on the roof.
4 . I have reviewed the Fire department Issue of reaching all around
the building with a 1 50 foot hose and feel this can be done from
the driveway area In front of the garage.
5. The 1 oo year flood Issue wfll be addressed prior to submittal for a
permit.
• • BRtr'fT M.M.I\l/\
•• ~.&27.9650
P.I?.B9X5211
VAIL. C91.. 9MD9
&1(,5&
•
C.hanges. c.ontlnued
6. The site plan has be done on a survey 1 rec.elved from Alpine
Engineering. Many of the notes and grading lines are the remains of
there driveway plan. 1 have done the grading around the house and
have tied It Into there driveway plan. though many of the notes do not
apply. 1 am working with them on c.omblnlng and c.oordinating my grading
with there grading to ac.hleve a more legible grading plan that will be part
of the Permit set.
1. As mentioned in Item 5 above. Alpine Engineering will be addressing
the driveway grading as well as the area around the c.ulvert. Y'{e
plan on re-working those areas to ac.hleve more gentle grades.
e . All of the grading 1 have done around the house is less than 2 : 1 with
areas of greater than 2: 1 c.learly showing boulder retaining.
'l. The Limit of Dlsturbanc.e line has been staked on the site for
review Tuesday afternoon.
10. You have suggested providing some landsc.aping along the west
side of the c.ommon driveway. Y'{e would like to disc.uss leaving the
meadow 'open' and putting some planting on the west side of the
pond area. Of c.ourse, the area of the driveway as well as all
disturbed areas will be re-vegitated with wildflower and grass seed
mix.
1 1. I have obtained slgn-offs from c.able and phone c.ompanies.
1 2. Ed zneimer will have a Title Report on Y'{ednesday.
In addition to the c.hanges that have been made I have produc.ed a new c.olor
board with spec.lflc. c.olor numbers as well as dec.k. balc.ony and eve details.
Please let me know If 1 have missed anything or If you have any questions.
51nc.erely.
-erent Aim, AlA
&TRUGTURI:&
arc.hltec.ture 4 planning
1111
1111
•
project:
date:
scale:
drawing title:
~Fft&rtft <"'" Ee¥-~.,.
A&NOTI:D
~~
~-----ceo,a.R SH,A.t<e ROOP"
ROOF R,A.FTeRS
RE::STRUGTURAL.PL.,A.HS
eXTERIOR t"'AL.L.
t"'/ SIDING
1 >< 4 N,A.IL.eRS
2 >< 4'S ON 'eDGe' e 24" OG
~-301 FeL. T, TYP.
rV SHOt"! 4 ICe SHieL.O e
eves, V ,A.L.L.eYS 4 RIDGe
PeRGOOe
ROOF SHe ,a. THING
ON ROOF JOISTS
Re: STRUCTUR,A.L. PL.,A.NS
2 >< 1 O'S t"'ITH CURVE:O
eoGe oeT ,a.11.. ( 2.., · ocJ
1'-b"
TYPICAL ROOF EAVE DETAIL
9/4"•1'-0"
P.O. Box 521 1
Vall. Golorado 81658
BRI:NT AL.M, AlA
e,a.ve OVeRH,A.HG
(M,A.XIMUM 1'-b")
BL.OGI<IHG ,A.S
RE:GUIRE:O BTt"'N.
CURVeD R,A.FTE:RS
/
STRI,A.TEOSH,A.KE
P,A.TTE:RH e
CURVED EVE .
HOL..O BACK PL.t"'O.
FOR COL.D ROOF
VeNTil-ATION
1 >< b T4G SOFFIT
t"'/ SOFFIT VeNTS
PI:RGOOE:
telephone
909.821.~650
STRUCTURES
arc.hltec.ture 4 planning
1111
1111
2X DEC.I<ING
•
........
t > ..._
:r,
r
(n
ll
~
• 't
:.-
BRENT ALM. A lA
projec.t: bvA-~fl. Gf!eE\C· ~.,.
date:
sc.ale : AS NOTED
drawing title: ~ P....\\..1 ~
•
•
•
C.OPPER
C.AP
9/4"DADO
C.ONT. 1 /2" STAINLESS STEEL
C.ABLES YV TURN-BUC.I<EI..S
EA. END
1 2" -1 4 " ROUND
LOG C.Ol..UMNS
1X6R5
TRIM
5/ e· RND. THRU
SOL TS (REC.ESSED)
-------2X 1 2 RS TRIM
LET BEAM INTO 1..06
A5 REG!. TO C.ENTER TRIM
DEC.!< FRAMIN6
RE: STRUC.TURALS
SECTION @ DECK RAILING
9 I 4 ·~ • 1' -0 ..
P.O. Box 521 1
Vall. C.olorado e 1 6 5 e telephone
909.e>21.CI650
STRUCTURES
arc.hltec.ture 4 planning • BRENT ALM. AlA
1111 ••
projec.t: &J~\fl ~ -4tr JsK-date:
scale: AS NOTED
drawing title: ~ ~\..'~
-, o:
I
I) I
I
I
I) : ---
CENTER 1 /4" X e·
STI.._ PLATE
RECESSED INTO TOP
Y"'OOD RAII..IN6 Y"'/
(.2) 9/8" RND.I..A6
BOI.. TS EACH I..E6
C.ENTER1/4"X61/.2"X 11 "
STI.._ PLATE Y'V
1 /.2" RND. THRU BOI.. TS
DATO TRIM AS REG. TO
C.OYER CONNECTION
. r-
1
(n
6 "
•
2 X 6 CEDAR TOP
RAII..IN6 EASE EDGES
CONT. 1 /2 " STAINLESS
STEEL. CABLES Y"'/
TURN-BUCI<.EI..S EA-END
1 /2 " STI... PLATE
BAI..ASTRADE •
CORNERS TO BE
MADE Y"'ITH TY"'O
BAI..ASTRADES TOGETHER,
CONNECTED Y"'/ THE TOP
4 BOTTOM SUPPORT
PLATES CONT.
1X6RS
TRIM
2X 1 .2 RS TRIM
DECK FRAMING
RE: STRUCTURAI..S
ELEVATION I SECTION® BALCONY RAILING
9 I 4 II -1' -0 11
P.O. Box 521 1
Vall. colorado e 1 o5e
telephone
909.fJ21.qb50
•
projec.t:
date:
&c. ale :
drawing title:
6uffehr c.reek Chalet **1 I
June 15. 1 C1C14 5K 1
1 I 4" • 1 ' -0" -
c.olor Board for DR6
EXTERIOR MATERIALS
GEDAR SHAKE ROOF
~ith Gopper Flashing
Go lor:
Ghar coal Gray (BM-1 44 2)
FASGIA I SOFFIT I DEGK TRIM
Rough sawn Gedar (Fascia)
2 Piece. 2 X 1 2 4 1 X 6
1 X 6 T 4 G (Soffit)
Go lor:
Olympic Solid Golor stain.
Goffee Golor
SIDING
Rough sawn Board 4 Batton
Go lor:
Forest Green (BM-441)
FRENGH DOORS I ~INDO~S
~ood Frame. Glad Exterior
Go lor:
Eagle ~indows. Ginnamon Toast
DEGK SUPPORTS
12·-14· Round Logs~~ Gopper Gap
Go lor:
Olympic Solid Golor Stain.
Goffee Golor
DEGK RAILING
Steel Gable
STONE VENEER
MOSS ROCK
~INDO~ GLAD SIDING FASGIA
telephone
303.821.q650
SUJDIVISION
JOB NAME
LOT
ADDRESS
The location and availability of utilities, whether they be main
trunk lines or proposed lines, must be approved and verified by
the following utilities for the accompanying site plan.
Authorized Signature
U.S. West Communications
1-800-922-1987 .
468-6860 or 949-4530
Public Service Company
949-5781
Gary Hall
Holy C~oss Electric Assoc.
949-5892
Ted Husky/Michael Laverty
·•Heritage Cablevision T.V.
949-5530
t V1<~o.{J/ {Je--/h4n<-<&-l
C ~/ 'J -J L( Steve Hiatt
Upper Eagle Valley Water
& Sanitation District *
476-7480
Fred Haslee
NOTE: 1. This form is to verify service availability and
location . This should be used in conjunction with
preparing a utility plan and scheduling
installations .
2. For any new construction proposal, the applicant
must provide a completed utility verification
form.
3. If a utility company has concerns with the
proposed construction, the utility representative
should note directly on the utility verification
form that there is a problem which needs to be
resolved. If the issue is relatively complicated,
it should be spelled out in detail in an attached
letter to the Town of Vail. However, please keep
in mind that it is the responsibility of the
utility company and owner to resolve identified
problems.
4. If the utility verification form has signatures
from each of the utility comp~nies: ~nd no
comments are made directly on the form, the Town
will presume that there are no problems and that
the development can proceed.
5. These veri fic ations do not relieve the contractor
of his responsibility to obtain a street cut
permit from the Town of Vail, Department of Public
Works and to obtain utility locations before
digging in any public right-of-way or easement in
the Town of Vail. A building permit is not a
street cut permit. A street cut permit must be
obtained separately.
* Please bring a site plan, floor plan, and elevations when
obtaining Upper Eagle Valley Water & Sanitation signatures. Fire
flow needs must be addressed.
9
STRUCTURES
architecture 4 p1ann ln9
1111
1111
GEDAR SHAKf ~OOF
project:
date:
scale:
drawing title:
GL.
1'-6"
.2 X 4 '5 ON 'EDGE' • .24" OG
~001" SHEATHING
ON ~0~ JOISTS
~P!: ST~GTU~AL. PL.ANS
!30• FEL. T , TYP.
rv SNO~ C IGE SHIEL.D •
EVES, V AL.L.EYS C ~DGE
PP!~ GODP!
~OOF ~AFTE~S
~E: ST~UGTU~AL. PL.ANS
6UFFEHR CREEK •1
06.14.q4
AS NOTED
RIDGE DET All..
BRENT AI...M, AlA
lst<-
ST~IATED SHAKE
PATTE~N AS ~EG.
FO~ GU~VED ~DGE
GU~VED ~I DGE
DETAIL. MADE F~OM
.2 X 1 .2'5 (VFY)
GONT. BUG SG~EEN
PE~GODE
----GONT. GOPPE~
D~PEDGE
TYPICAL ROOF RIDGE DETAIL
9/4"•1'-0"
P.O. Box 521 1
Vall, c-olorado e 1 ose telephone
505.821.c:tb50
... ..
I
STRUCTURES
arGhlteGture 4 21annln~
1111 projeGt:
date:
sGale: •• drawing title:
C,ENTER 1/4" X e·
STL PLATE
REC,ESSED INTO TOP
Y"tOOD RAILING Y'V
(2) S/8" RND. LAG
60L TS EAC,H LEG
C,ENTER 1 /4" X 61 /2" X 1 1"
STL_ PLATE Y'V
1 /2" RND. THRU 60L TS
DATO TRIM AS REG. TO
C,OVER C,ONNEC,TION
= r-
1
in
e BRENT AL.M, AlA
6,)~ Ci\ft ~ .,.. lsK-AS NOTED
~~\..1~
4 "
•
•
2 X 6 C.EDAR TOP
RAILING EASE EDGES
C,ONT. 1 /2" STAINLESS
STEEL C.ABJ...ES YV
TURN-6UC,I<ELS EA-END
1 /2" STJ... PLATE
BALAS TRADE.
C,ORNERS TO BE
MADE ~ITH TY"tO
6ALASTRADES TOGETHER,
C,ONNEC,TED Y"t/ THE TOP
4 BOTTOM SUPPORT
PLATES C,ONT.
1X6RS
TRIM
2XDECKIN6~
!-----=----'lir---.......... --l-.n.
l l1 1/2"
1 1
2X12 RSTRIM
DEC,K FRAMING
RE: STfWC,TURAJ...S
ELEVATION I SECTION® BALCONY RAILING
9 I 4 II -1 I -0"
P.O . Box 521 1
Vall, C,olorado e 1 658
telephone
S03.821,q650
I
!:>TRUCTURES
arc.hftec.ture 4 planning
1111
II
:2X DECKING
.
lO
.......
(
> "" .
.l)
I
(n
lL
~ .
't
-=.t
BRENT ALM, A lA
projec.t: ~ffET\fl. ~ ,...,.
date:
sc.ale : AS NOTED
drawing title: ~ ~\\..1 ~
•
•
•
COPPER
CAP
9/4"DADO
CONT. 1 /:2" STAINLESS STEEL
CABLES Y'V TURN-BUCKELS
EA. END
1:2"-14" ROUND
LOG COLUMNS
---1X6RS
TRIM
5/8" RND. THRU
BOLTS (RECESSED)
-----:2X 1 :2 RS TRIM
LET BEAM INTO LOG
AS REG. TO CENTER TRIM
_1___.(¥---=>-:::::::::::_ ___ DECK FRAMING
RE: STRUCTURALS
SECTION ® DECK RAILING
9 I 4 II -,. -0 11
P.O. Box 5:21 1
Vall, colorado 81658
telephone
909.8.21.q650
--------
STRUCTURES
architecture 4 p lanning
II
II
P"LASHIN6
projec.t:
date:
sc.ale:
drawing t itle:
BRENT ALM, AlA
BUFFEHR GREEK **1
06.14.Cl4 lsK-AS NOTED
~OOD BAND DETAIL
BOARD • BATTEN
51DIN6
eXTERIOR 2 X 6 ~ALL
FURR OUT BAND
AS REGUIRED TO
BE BeYOND TRIM
O~S~E~C_T~IO_N~®-~_O __ O_D __ B_A_N_D ____________ __
9 I 4 II -1 I -0 11
P.O . B ox 521 1
Va ll , C-olorado e 1658
telephone
303.821.q650
STRUCTURES
architecture 4 plann lnsa
1111 •
STONE CAP
(P"L.A6STON!:)
DCCI< JOIST
R!:: STRUCTURAL.
PL.ANS
project:
date:
scale:
drawing title:
BRENT AL..M, AlA
BUFFEHR CREEK •1
06.14.q4 lst<-AS NOTED
STONE VENEER SEC.
BOARD t BATTEN
SIDIN6
~---!:XT!:RIOR 2 X 6 ro!AL.L.
~--STONE VENEER we-S tt/f-Sw.t
(MOSS ROc.!<)
CONT. ANGL.E IRON ~t1'cF-
SUPPORT FOR STONE ~(.tjl$. ~--
~--TOP OF L. T. ro!T. C.ONC..
P"L.OOR
FL.OOR JOIST
R!:: STRUCTURAL. PL.ANS
TIMBERSTRAND
RIM JOIST
CONT. L-EDGER
BL.OCI< OUT AS REG.
BEYOND STONE VENEER
O~S=E=C~T~IO~N~®~S~T~O~N~E~Y~E~N~E~E~R~----------
9 I 4 11
• 1• -0 11
P.O. Box 521 1
Vall, Colorado e165e
telephone
sos.e21.qoso
75 South Frontage Road
Vail, Colorado 81657
303 -479-2138/479-2139
FAX 303-479-2452
June 3 , 1994
D ep a rtm ent of Com munity Developm ent
Brent Aim
P.O. Box 5211 11of:plef~
Vail, CO 81658 1 ..~~, 'J i\lilv 1l 1 I ~ b a.r/ t ha.rrl!J-'\ t'ti{;(c"' Jt ·freA.
Dear Brent: cwv"'f (/ I ~(lei ~oll-1~~{ ;~pttfrft.~e. 4 I S"t"#-+' tfi ·-1.!~1 ~·'~j
At their meeting on June 1 , 1994, the Design Retfe.w Board (ORB) requested at you alterW/ ·
the design for the Zneimer residence by removing the shingles and going · a more
conventional siding. The ORB also requested that the eyebrow dormers be changed to match
the more conventional dormers that were utilized elsewhere on the house. Other than these
two changes, the ORB felt that the materials and colors were generally acceptable, and had
no additional comments on the landscaping or site planning.
I have received comments from the Fire Department and Public Works regarding this
application. The Fire Department had no major issues . One thing you should watch for is the
Fire Department need for a staging area from which they can reach around the entire house,
to the farthest corner in the back, with a 150 foot hose. If you have an uestions regarding . ~
this issue, please contact Mike McGee at 479-2250. cltect Jl r'Vff!6ee.. t.(JGC~~~
Greg Hall and Terri Martinez, engineers with Public Works, had the following comments . TheyJ ~~~
felt that some of the notes on the site plan were hard to read and want you to clarify them by
moving labels to a more visible location on the plan.[They also stated that the pond needs to
be designed to pass a 1 00 year frequency flood, which would require a hydrological and
hydraulic analysis by a qualified engineer. In relation to this issue, we have discussed the
(J ~,/r·it~~, 6 vacation of a portion of a drainage easement that conflicts with the current house location . A :.,!'!. f. r . qualified engineer should look at the drainage easement requirements on and above this
f'-...!,:.-t:-f7lrir.1'f.JM. property and make a determination as to whether a portion of this easement could be
vacated. Written documentation from an engineer should be submitted in regards to this
issue_]
~~t.S'£11 ur engineers noted steep cross slopes on the common driveway. Especially, at the entrance
UL a.: · where a 6% cross slope occurs right as you come off of Buffehr Creek Road onto the
~ VJ\o driveway. If this cross slope can be reduced it is advisable as this excessive slope may .
r-tf create problems in t he winter. Terri and Greg also noted that the fill slope on the up-valley?
~ side of the common driveway was very steep, unsafe, and requested that a guardrail be ...J
provided . Another solution to this problem would be to extend the culvert pipe to allow for a
more gentle grade out from the road down to the swale. The maximum unretai ned slope
allowed by the Town is 2 :1. If this slope is greater than 2:1, it should be reduced in
steepness. Terri and Greg also felt that site disturbance would be greater than indicated on
/f' the site plan . Would you please address this issue by taking a hard look at your limits of
1 disturbance to determine if they are realistic and if not, modify them.
c,e 11-f' Pul: --)I!J~rf;iJI:~ ~~ ~u~
Mr. Aim
June 3 , 1994
Page 2
As we discussed after the DRB meeting, it would be advisable to meet on si t e once the house
location is staked to assess the impacts to vegetation. Th is should be done before the next
DRB meeting which could be as soon as the 15t h of June depending on how quickly you
address the comments of the DRB and Town staff included in this letter. Please call me at
479 -2138 and make an appointment for the site vis it.
Please submit rev ised plans and a color board to me no later than Friday, June 10 , 1994 of
you wish to go for f inal DRB approval at t he DRB meeting on the 15th. I w i ll also need the
following information prior to that meeting :
Cable and phone company sign offs ;
• Titl e....H~rr:-
Sincerely ,
!~dp
Town Planner
P.S . Please provide some landscaping along the down valley side of the common
driveway. Th is fill slope should be revegetated with shrubs and trees as
appropriate . Thanks , talk to you soon .
• •
TO: MIKE McG E E TODD OP P e NH EI M ER
R.t\:JD Y STOlJDER
Return to ------~------------T ovm Planne r
INTER-DEPARTMENTAL REVI EW
C OMMENTSNEEDEDBY: ___ ~~/~J ________________________ __
BRIEF DESCR IP TION OF TH E PROPOSAL:
Akw ~/-" ~i ~ ~ Lor 7 1 7/i~.
En gi neering:
'"
Landscaping:
Reviewed by: _____________ Date: _____ _
C omments :
Fire Dept.:
Reviewed by: _________ Date: _____ _
Commen ts:
Di s tributed to the Fire Department , Public Wo rk s, and La nd scapin ~ on ________ ,
• • -TO:~GEE GREG HALL TODD OPPeNH E IM E R
RANDY STOL"J 2~
Ret u rn to ------~---------T ow n Planner
INTER-DEP AR TME NTAL REVIEVv
PROJECT: Zr1e.~ -ks1k .
DATE SUBMITTED:5ji:f DATE OF PUBLIC HEARING _-..~€'-~<ft,.:;oC.___ __
COM MENTS NEEDED BY: -----~:L......I--~~_,_1 ___________ _
BRIEF DESCRI PTION OF THE PROPOSAL:
A/e-J ~~ ~ ffV'-_brf7 ;{Aaqrlt ;;__ ~~ 4.
· ~ss;JJ s~ /fclc/~~1 Engineeri ng:
Rev iewed by: _____ __.:_ ____ Date: _____ _
Comments :
Landscaping:
Rev iewed by: ______ Dat e: ____ _
Comments:
Di s trib ut ed to the Fi re Departme nt, Public Wcrks , and Landscaping on ______________ _
I
I
I
I
I
I
I
I
I
I
I'
I·
I
I
I
I
I
I
I
•
DRAINAGE REPORT
FOR
ZNEIMER POND
(Tract A, Lia Zneimer Subdivision)
Prepared for: Mr. Ed Zneimer
P.O. Box 305
Minturn, CO 81645
Town of Vail
Eagle County, Colorado
August 1994
Prepared by: Alpine Engineering, Inc.
P.O. Box 97
Edwards, CO 81632
•
I
I
I
I
I
I
I
I
I
•
TABLE OF CONTENTS
I. SITE VICINITY MAP
II. INTRODUCTION
ill. DESIGN METHODOLOGY
IV. SUMMARY
V. TABLE AND FIGURES
Table 1 -Pond Summary
Table 2 -U.S. Soil Conservation Soils Summary
Table 3 -U.S. Forest Service Soils Summary
Figure 1 -Offsite Drainage Map
Figure 2 -U.S. Soil Conservation Soils Map
Figure 3 -U.S. Forest Service Soils Map
VI. APPENDICES
I Appendix A -Drainage Calculations
·I
·I
I
I
I
I
I
I
I
VII. MAPS
•
I I MILE
•:::6000::::::=7:JOOO=::::;:FE:;:E:;:l =::::3
I KILOMCTER r
IICURACY STANDARDS
122092
LABLE ON REQUEST
ROAD CLASSIFICATION
QUADRANGLE LOCATION
Primary highway,
hard surface
Secondary h ighway,
hard surlace __ .
.· In terstate Route
Revisions shown in purple and woodland
compiled from aerial photographs taken 1984
and other sou rce data. Partial fiel d check
by U . S . Forest Service. Map edited 1987
Light-duty road . hard or
improved surlace ___ ==~~
Unimproved road _ ====~===
,-) ---L ·u ~s . Route L ·State Route
VAIL WEST, COLO.
NW t • MINTURN 15 ' OUAORANOLE
39106-F4 -TF-024
1970
PHOTOREVISED 1987
DMA 4763 Ill NW-SERJES V877
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
II. INTRODUCTION
Tract A, Lia Zneimer Subdivision is located in the Town of Vail, Eagle County,
Colorado. The project is located on Buffehr Creek Road above Lions Ridge Loop .
The purpose of this drainage study is to evaluate and redesign the existing pond to
convert it into a reflecting pond with a permanent pool. Also evaluated was an
addition to the existing drainage easement to encompass the actual location of the
drainage swale through Tract A.
III. DESIGN METHODOLOGY
The site was previously evaluated by RBD Engineering Consultants of Fort Collins,
Colorado on May 13, 1991. The drainage basin consists of a sloping valley with
slopes from 8 to 20 percent. The vegetation consists of wild meadow g rasses, scrub
brush and pine and aspen trees.
Peak flows were calculated u sing TR55, "Urban Hydrology for Small Watershed",
June 1986 and TR20, "Computer Program for Project Formulation Hydrology", May
1992, as prepared by the U.S . Soil Conservation Service. TR55 was used to calculate
Runoff Curve Numbers (RCN) and the Time of Concentration (Tc). Flow Rates (Q)
were calculated using TR20. The 24 hour precipitation (P) values were taken from
"Procedures for Determining Peak Flows in Colorado" (F igure S-7) and were found to
be 2.4 inches for the 100 year storm. Flows were calculated usin g the actual so il types
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
as obtained from the U.S. Soil Conservation Service in the Soil Survey of Aspen-
Gypsum area, Colorado, parts of Eagle, Garfield and Pitkin Counties, and from the
U.S. Forest Service.
The drainage basins from RBD report were combined into one basin and the Time of
Concentration was calculated for the whole basin.
The detention pond was modeled with TR20 using the proposed grades in the pond
which reflect a 1.5 feet deep pond with a permanent pool. The available storage in the
proposed pond was calculated at different elevations and plotted on the Elevation-
Storage Data Chart. The storage in the reservoir used by TR20 begins at the top of
the riser at elevation 8190.75 as indicated on RESVOR card. The flow rate out of the
pond spillway was evaluated at different elevations using the Design Data for Earth
Spillways Chart as prepared by the U.S. Soil Conservation Service. Flows were
evaluated for vegetated spillways and bare earth spillways to determine if the spillway
would be adequate regardless of the ground cover. The spillway used was 18 feet
wide with 2 :1 side slopes.
The storage volume and flow rate out of the pond at different elevations were then
plugged into the TR20 computer program with the developed 100 year storm flows as
the flow rate into the pond. TR20 uses the inflow, storage volume, and outflow rate at
different elevations to generate the maximum outflow rate and a maximum water
surface elevation in the pond.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
IV. SUMMARY
The existing Zneimer Pond was evaluated to become a 1.5 foot deep reflecting pond.
An outfall for the pond was designed to safel y pass the I 00 year storm.
The outfall consists of a riser structure and an earth spillway . The riser structure is a
4 foot diameter manhole which was evaluated for both weir and orifice flow. A 24
inch diameter CMP barrel is the riser (manhole) outfall and became the restrictive
device as flows increased into the riser. The spillway was evaluated for both vegetated
and bare earth conditions. Flows into the riser and the spillway combined to provide
the discharge from the pond.
The TR20 output shows that the maximum water surface elevation during the 1 00 year
storm event is just below elevation 8192. The pond embankment top is set at 8193
thus providing 1 foot of freeboard . Riprap is provided on the downhill side of the
spillway to prevent erosion. The pond will safely pass the 100 year storm.
The drainage swale leading to the pond was evaluated based upon actual field topo.
Calculations provided at the end of the drainage calculations show that the flow will
be under one foot deep and an additional easement line has been show on Sheet 2 of 2
in the maps. This line will be incorporated into the final plat.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
TABLE I
POND SUMMARY
SPILLWAY TYPE 100 YEAR WATER POND EMBANKMENT
SURF ACE ELEVATION TOP ELEVATION
Vegetated 8191.97 8193 .00
Bare Earth 8191.99 8193 .00
TABLE II
U.S. FOREST SERVICE SOILS SUMMARY
MAP SYMBOL SOIL NAME HYDROLOGIC SOIL
GROUP
11 Anvik, Skylick, Slighting B
47 Forsey B
TABLE III
U.S. SCS SOILS SUMMARY
MAP SYMBOL SOIL NAME HYDROLOGIC SOIL
GROUP
346C Gateview, Handrau, Eyre c
348C Tellura, Eyre c
467B Leadville B
6000 1000 r£n
::::=tl-=====:=:=:31 KI LOM£
1
TER
F EET
1M I 1929
)NAL MAP ACCURACY STANDARDS
OFFSITE DRAINAGE MAP ROAD CLASSIFICATION
QUADRANGLE LOCATION
Primary highway,
ha rd surfa ce
Sec ondary highway,
hard surface
Intersta te Route
Light-duty road, hard or
improved surface ..
Unimproved road _____ ========
U .S. Route State Route
VAIL WEST, COLO.
NW /4 M INTURN 15' QUADRANGLE
S
H
E
E
T
NO
.
13
SO
I
L
SU
H
V
E
Y
OF
AS
P
E
N
-
G
Y
P
S
U
M
AH
E
A
,
CO
L
O
R
A
D
O
,
P
A
R
T
S
OF
EA
G
L
E,
GA
R
F
I
E
L
D
,
AN
D
P
I
T
K
I
N
C
O
U
N
T
I
E
S
(E
D
W
A
_
f
W
S
QU
A
D
H
A
N
G
I
.
E
l
R.
8
2
W.
l
R
.
8
1
W.
10
6
>,
q
·
,
··
-----------------------------------------
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
--
-
-
--
~
--
-
-
--
-
-
-1
~-
-
-
-
~
~
~-
-
-
-
-
-
--
-
-
-
-
-
-
-
-
-
-
--
~
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
--
--
-
-
-
-
,
J•
J
~: ·~·
-
Q.
< ~
{/
)
..
.
.
J
·-
I
I
0
{/
)
w
u
>
a:
w
{
/
)
z
0
..
.
.
< >
a:
w
{/
)
z
0 u
..
.
.
J
0
{
/
)
~~·7·· ·\~·· ."'r'.f r-: ~T.·Y"·=-~
.
'
i
'
·~·· r
,
.
·'A
"
···
..
,
.
.
.
. l~''
'
·
·· .
:·
.-·
.--
-·~;·::,:
·
· .
·;:-,;'
(
>
£
~
··.-:
'· '·
·
•·
'
·
.
'
•:·:
:
:
.-
.'
t'Q •. ~g:~ .. ~:;.~:,, ~·; .. ~ ... Jvrr-t~ !!~··) ..
.
.
::
.
·
.
-~ .\
i:
l
;-
••
;,M~----.. ~~l':
N
:
.
<
·.·-1.1~-~:~~:
~
~
u
:
:
.
:
:
il~
i
lf
~("i\ .•.• t.~~. ·'' -~.·.. ;:__.;_ .· .. , .... :··--
\·:·.:·~
·t: .. ~ ..
:.[•\·.
:.··-~;y;~'!'·.~·~: ... :=.-.-~·. -~~~> <,~~·~
;~;·;·0·:~~-~-·
-
-
-
H.
US FOREST SERVICE SOILS MAP
I G Interstate Hoghway
G U.S Hoghway
' -a (';;) I
C::t2t. u .......... -.
VAIL WEST . COLO.
I
I
I
I
I
I
I
I
I
I APPENDIX A
I
DRAINAGE CALCULATIONS
I
I
I
I
I
I
I
I
I
I
I
I
I
I
' i
w
I
0
f z
~ >
11
I
I
I
I
I
·I
II
? -I u
" .......
.J
0 >
-,.
o# -.......
_jl ~I
-jl
" I o# -:· --:r gi
-
:;j
::t
1-
(l. w
0
il gE II
< !
-.
o# -.......
< w
0:: <
-·::::
.......
< w
0:: <
:z
0
1-< > w
..J w
~ ('()
-...._ \() \) •
() ~
~ ~ \n CJ ....... ~ !:'--...._
\D ~ '-..
')-~ I'
\{\ ~
"' 1\)
""'
N ':}
f{J
\'-~ \"-
':t-1-11
I
\\\ 1\lJ --s ~ \' ~ \"< \f ~ ~
~I ~\ 01
~ § ~ ' --..
\lJ \( \)J
• ~ I I
•
j f--i-' ' it::H -:r-j ,_1 ' ' I
' --·-!-' ' ~ ~--I
I >\ I
I,. I
o ' I
-]-.;... f--i i . .i
I I I I I I
' ..
[+·;· +~ ++
r'--i .l-...L!.-: : '
I
' ' -'· r..
I '
: ' j
' I
'" i ' '
I l I I -• ' ) , \ I I 1 : ' _._ --r,;-"7T"i"" -, _1_
I j I • I I t 1
: ' 1 I j I
! ! : : ' ' ; '
' ' W : 11 ' '1._ ' : ' ! '\1 ' > I I : ' I ' ; : I
I I : . ' I ' ' ' I I
'
' ' ' '
I ' '
' I
I
' ' ' I I o
I
I I 1 I I I
' ' ! I ' : I
' I ' : I l : ' I
' _1_
I
L
I~~ I 1
I ,-:~ :I I ' I
I I • I I ·-
! I I I , I 1
' '
' _I
I
I
I I I I
I
' '
' I
I a:: t : ::::> II I 1 !1
U Iii ' 'I 'I
I ; ' : ' : : ' ' I I
r-;·jl~l+t l:j::' =::+:::ttl ; t I\' I +'++=· ·t:t· =~:;:::~ w 1-. I ' : -+-!-i"7. -H1.-+H+--++.;.. -!
(!) ,,, -l....L~---·1_1._•1
N
<)
< r--;-.-: . I • ~ I ' . 11 I ~--~I+'--_,...;._"..;---~ a:: ' ! • I I ' ' 1 ' _j_ • 1\ : ! i ' •-'_
0 §-~-~ ~~~-~~~~~~·t-~~-'§-~ ~·if·~ ··ag~E· ~~t-ilT.., .. ,.... . ·~
~ : I ~ ~ .•. , : ·:--~;.. ·++· ~~~-_.;._!_ I ---·4 _,
~ ~~~:~ ~.!~~:-~'--2'~~--~--:~-~It~~-~:§!~:~-~-f~~~, ~:~!:E§~~i~~t,_§· ~~~~1--o ,--lj-~' -'· -, .. ··•_·l' i r---~-i---l .j i Jm' . .LJ .. -L-< -----~T--l--H-
J-; ~ -~-.l-~ . ~ ! . !.1: ,.;.!.j-1--. ~.!..!-1 __ _;_ -·-;.1 ._ 1-1 •., • I . I· ·Tl t · · • · r-I I~ I .. J -~ --,: ' t •• J I • I .. ~--··• < : 1 : .,. • -·-· i .. , ~ ~-,.; -. ,-; ., :'V· i-·-~
> .. I I ' -.. . • • • .. I ' I i ; . I j ; I N; . ., . ___ ; .J-..__~_; ~ =±s :::.:.·-~; j-·. ~-~l_----~ h 1_-lit~_-.·1-:t· -:-l..+-..
W T~ ~ ·-----d ~ ··• i·:· •l h· :_ffi~---
. w. : . i: _lilt i : ; H . ~ I i 'll't' i j ; :\ =-=-.:. : --:-:--~ ~ I ' . . . ~ ~ . I I : j t l . J; ~~ ---·-;-~·--
1 , --:-r··· ··-' : --· r-1 , 1 ,. "-+-· -t-~
l· il ~~-~~~~li_ 1.1_l ·j+l' It it)l··1· l't j\i--it :f+t:;.
1-· l II I I lll I I l ~ ~-~ . --l \~-
...._
~ ..._ ......
'\!) \S)
ELEVATION (M.S.L.)
-\\: • ~ -w
(!)
< a:
0
1-
V)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
V
1
I IX
.
.,
0 c
...
.
CD
...
,
PR
O
J
E
C
T
:
Z
n
e
(
m
e
r
DE
S
I
G
N
E
R
:
JI
«
J
DA
T
E
:
8
/
!
Z
/
9
<
/
HY
D
R
O
L
O
G
I
C
AN
D
CH
A
N
N
E
L
IN
F
O
R
M
A
T
I
O
N
SK
E
T
C
H
ST
A
T
I
O
N
:
I
I
I
E
L
.
_
z.
t
!
c
tY
J
P
:J
3
:
:
r
r
p
?
A
H
J
=
_
/
~
j_
a,
=
··
T
w
1
=
i
-
-
-
E
L
.
_
/
TW __
02
=
TW
2
=
s
.
E
L
o
.
.
J
T
L
o
,
.
=
=
••
(
0
1
•
D£
S
I
G
H
DI
S
C
H
A
R
G
E
,
SA
Y
D
u
)
ME
A
N
ST
R
E
A
M
VE
L
O
C
I
T
Y
=
0
2
a
CH
E
C
K
DI
S
C
H
A
R
G
E
,
SA
Y
0~
0 OA
0
1
0
0
MA
X
.
ST
R
E
A
M
VE
L
O
C
I
T
Y
=
HE
A
D
W
A
T
E
R
CO
M
P
U
T
A
T
I
O
N
"
CU
L
V
E
R
T
~
..
.
.
.
.
..
w!
:
DE
S
C
R
I
P
T
I
O
N
IN
L
E
T
CO
N
T
.
OU
T
L
E
T
CO
N
T
R
O
L
HW
=
H
+
ho
-
L
S
0
..
J
il
l
.
.
J
U
0
SI
Z
£
i
2:
o
-
O
CO
S
T
COMMENTS
.!
:
!
.
:
!
d
d
+0
1-
ij
;
;
!
IE
H
I
~
l
H
C
E
lY
P
E
I
HW
Ke
H
c
~
TW
h0
LS
0
li
W
g.
D
.
>
z
...
b
.
)
S
E
'
q
o
e
£
"
,,
;/
.
I
z
~
2-
1
z
.
/
•
S
f
!
Q9
z
B
2t
/
,,
J/
-
z
'
5
?
.
2
q
;
.
s
o
[
~
"'2
«
1
,,
z
¥
.1
/
.
7
'
5
q
,
o
o
"
-
z
-
32
.
.
21
/
2
.
&
?
,
2
5
q
2
~
~~
~
zt~
"
z
.
1
5;
7
'
5
'
SU
M
M
A
R
Y
6
RE
C
O
M
M
E
N
D
A
T
I
O
N
S
:
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1-
I
I
I
... , 168
I~&
144
l::lZ . :a
<J ... .. .. .... ..
.... .. a:
" .. u
" "' .. ..
"l
...
0
c:: .... ... .... :,;
<
0
:i
u
0 .. ..
0 z .. .. ..
• •
CHART 5
10,000 ( I )
8,000 EXAMPLE
6,000 D• 3' hr.chl (l.O t .. l)
(2)
~.ooo 0•6& ch (3)
4,000 •• • ••
3,000 0 (f•••J
Ill 1.1 ,..
z.ooo (2) ~.I O.l
I' I t.Z •••
'D '" h•'
1,000
800
600
500
400
300
zoo
1.0
H: SCALE
Ill
ENTRANCE
TYPE
(2)
[ll
WU1Ud t1 Col'lhr•
•• •••••
To 1111 ICIII (Z) If (]) prejeCf
herizol'ltoiiJ to sui• 111. ta.•
1111 1tr1i1ftl ti'ICiifr.ed Ji1111 fltr-tlt
D IIIUf Q ICOIII 1 er ro•er-Gl
ill .. ltlhd.
.7
.s
HEADWATER DEPTH FOR
C. M. PIPE CULVERTS
WITH INL'ET CONTROL
5-25
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
£_
;
5
<
?
/
:~:
:
3.
1
(
-
r
)
(
;
)
A
'¥
-
z
:
3
€
.q~
h
-;r~ j
~,.
o.
~c '11'~<
f
)
~
O
<
:
.
v
.
<
l
fh: uo .1>1if1:
Ve7
~
/a
f.
o
c
/
·
( I
8
~.o
i
I/
.
.
_
\
-
:
>
.
:
;
'\
.
I
"
'
-
Co
t
m
:
t
.
.
R
I
"
'
e
~
\N
4b
E
EL
E
Y
.
S
T
o
~
G
~
{
.
.
)
e
,
I
R.
O
V
.
.
I
F
"
I
C
G.
..
'
J,
Q
h
IN
'
V
\
O
e
i
.
(
N
'
i
L
.
)
(A
C
.
·
~
)
(r
r
T
)
KC
F
)
)
a.
h
Q
,
'
l
(
F
T
)
((
.
V
.
.
)
'-
.
J
:
"
-
r
)
lc
.
c
:
:
.
tl
:
.
'
'!
:
o
e
~
-
·-
·
-
-
·
·
·
-
-
--
-
-
·
-
-
-
-
-
e
-
·
-
·
·-
-
-
·
-
·
-
-·
~;
·
·
;
o
7
§
t
'
)
.
j(
a
_
(_
..
.
.
.
.
.
.
0
Q
0
..
.
.
Q
_
_
_
c
__
-
-
-
·
-
-
-
'
P.
!
C
J
o
e-
:
:
.
o
.
;
7
"
3
Co
0
tf
)
.
I
/
.
2
o.
I
Lq
·
l
.
.
-
-
-
-
-
·
-
-
·
·
.B
L
-
<
f
l
~
o
.
;
q
{
c
c~
6
.
2
5
~ ;;,
-
~
-
,
0
.
2
'
5
30
.
"
3
8
L
q
l
s-
o
C'
.
zw
s
Q_
,
"5
'
tl
f
.
o.
r
s
2'
5
'
.
3
o.
7
"
5
~z
t
/
?3
;
q
z
~
6
.
'
3
3
/
.
0
43
/
.
2
5
'f
;
'
-
/
.
1
/.
2
"
5
(e
7
.
C
o
t<
tc
1
z
-G
O
CJ
J
/
C
;
D
;
,
£
6
8
)
.
7
5
10
7.
/.
{
~
f:
b
.
D
.
-
·
-
-
·
.
-
-
-
-
-
·
-
-
-
-
-
·
__
_
.
.
_
..
-
.
~-
·
IO
~
c
t
~
I
C
i
l
-
I
l
-
l
L
~
\
O
U
"
l
L
e
T
..,
Q
H-
a
(F
"
1
"
)
(
c.
r
-
:
.
.
)
(
P
r
)
(<P
~
~
..
~ ..
.
.
-·
·
-
-
-
-
·
-
-
-
-
·
·
-
-
·
.
-
-
D
0
-
-
-
-
f
-
·
1-/.
I
7&
-
-
IJ
J
.
z
5
2
8
IJ
/
.
7
_
;
;
3
0
5.
2
~
:
3
2
?
J
i
~
-
-
-
--
-
-
-
-
·
·
-
-
OL
I
T
~
A
L
L
0 I~~~ .\(cr,.IO {Tn"'-Q) W&G. (c ~'> ')
·-
/.Z ;/,~ --sq. 3. /5:0 /23.0 ' ' . I <.n , G) rr1 I <.n ... 0 ::0 )> G) rr1 I i n J: )> ::0 G) rn
I ·-~~ • .1•· ;: ..... • . -., ) . .·,.· •• 11-54.5
DESIGN DATA FOR EARTH SPILLWAYS -
I STAC( SPILLWAY BOTTOM W IOTH (b) I N FEET
1"<>1 T f.-A1A8 L£S 22
'"" F([
8 10 12 14 16 18 20 24 26 28 30
8 9 10 12 14 14 16 17 18 20 21
0 .5 v 2 .7 2 .7 2 7 2 7 2 7 2 7 2 7 2 7 2 7 2 7 2. 7 2 .7
s 39 3 9 3 9 39 3 9 3 .9 39 3 8 3.8 38 3.8 3 8
I X 32 33 33 33 33 33 33 33 33 33 33 33
0 8 II 12 14 16 19 2 4 6 27
0 .6 v 2 .9 2 .9 3 .0 3 .0 3 0 30 30 3 .0 30 3 0 30 3 0
s 3 . 7 3 .7 3 .7 3 .7 3 .7 3 . 7 3 .7 3 .7 3.6 3 .6 36 3.6
X 36 3 6 3 6 .36 36 37 37 37 37 37 37 37 o . I I 14 16 19 2 1 2 4 2 6 2 9 31 33 36 38
I 0 .7 v 3 .2 3 2 3 2 3 2 3 .2 3 2 3 2 32 33 33 .lJ ll 3
s 3 .~ 3 .5 3 ~ 3 ~ 3 5 3 .5 3.~ ~--· ,4 3 .4 3 4 3 .4
X 4 0 4 0 40 4 0 41 41 4 1 4 1 4 1 4 1 41 4 1
0 14 I 7 20 2 3 26 30 32 35 38 42 45 47
.o .e v 3 .5 3 .5 3 .5 3 .6 3 .6 3 .6 3 .6 36 36 3 6 3 .6 36
5 3 .3 3 .3 3 .3 3 .2 3 .2 3 2 3 2 3 2 3.2 3 2 3 .2 3 .2
I X 44 4 4 44 I 44 45 4 5 45 45 45 45 4 5 4 5
u 19 22 2 5 28 32 36 4 0 43 47 51 55 59
0 .9 v 3 .7 37 3 8 38 3 8 3 .8 3 .8 38 38 3 e 38 3 .8
5 3 . I 3 .1 3 .1 3 .1 3 I 3.1 3 .1 3.1 3 .1 3 I 31 3 I
X 48 48 48 48 48 48 48 48 48 48 49 49
21 7 I 35 58 4 48 5 , 56 6 64 69
I 1.0 v 3 .9 4 .0 4 .0 40 4 .0 4 .0 40 40 4 0 40 40 4 0
5 3 .0 3 .0 3 .0 3 .0 3 .0 30 3 0 3.0 3 .0 3 .0 3 .0 3 .0
X >2 >Z >Z >Z >Z 2 z 2
25 31 34 4 0 45 48 5 4 60 65 70 7 4 79
1.1 v 4 I 4 I 42 42 4 .2 4 .2 4 .2 4 ,2 4.2 4 .2 4 .2 4 3
s 2 .9 2 .9 2 .9 2 .9 2 .9 2 .9 2 .9 2 .9 2 .9 2 .8 2 .8 2.8
I X 5 5 55 56 56 56 56 56 56 56 56 56 56
42 47 52 59 65 71 76 82 88 92
1.2 v 4 .3 4 .3 4 .4 4 .4 4 ,4 4 ,4 4 .4 44 4 ,4 4 .5 4.5 4 .5
5 2 .9 2 .9 2.8 2.8 2 .8 2 .8 2 .8 2 .8 2 .8 2.8 2.8 2 .8
X 59 59 60 6 0 60 60 60 60 60 60 60 60
0 35 42 48 55 6< 6R 75 : 82 89 95 101 109
1.3 v 4 .5 4 .5 4 .6 4 6 4 6 4 .6 4 .6 4 .6 4 .6 4 .6 4 .6 4 .6
5 2 .8 2.8 2 .8 2 .7 2 .7 2.7 2 .7 2 .7 2.7 2 . 7 2.7 2 .7
X 63 63 64 6 4 64 64 6 4 6 4 64 64 64 64
4 48 ~6 64 7 78 86_ -'3 3 100 10 8
1.4 v 47 47 47 48 4 8 4 .8 48 4 ,8 4.8 4 _8 -4.8 48
5 2.7 2 .7 2 . 7 2.7 2 . 7 2 .7 2 .7 26 2 6 2 6 2 .6 2 .6
I X 67 67 67 I 68 68 6 8 68 68 68 68 68 68
0 46 5 4 63 7 1 82 88 96 106 13 121 IZ8 136
1.5 v 4 .8 4 .9 4 .9 49 4 9 49 5 50 5 .0 5 . 5 . 5 .0
s 2 7 2 7 2 6 2 6 2 .6 26 26 2 .6 2 .6 2 .6 2 .6 2 .6
X 72 72 72 7 2 7Z 72 72 72 72 72 I 72 72
u ~2 6 0 70 I 81 90 100 1 10 118 12 9 137 145 155
I 1.6 v 49 5 0 5 . I 5 I 5 .I 5 .1 ~ I 5 . I ~.I ~ 2 ~-2 5 .2
5 26 26 2 .6 2 .6 2 .6 2 5 2 .5 I 2 .5 25 2 .5 2.5 2 .5
X 76 76 76 76 6 76 76 76 78 76 76 76
~8 68 78 9 I OC I 132 14 I 149 1 60 168
1.7 " 50 52 ~ 2 5 .3 5 .3 5 .3 53 53 53 ~ 3 ~3 5 .3
5 2 5 2 5 I 2 5 2.5 2 .5 2 ,5 2.~ 2.5 2.5 2 5 2 5 2 5
I X eo 80 80 80 80 eo 80 I eo eo 80 80 80
u 65 76 86 100 II IZZ I 14 I I 17 I
I .B v 5 .2 5 .3 5 .4 5 ,4 ~.4 5 .4 5 .4 55 55 5 5 55 5 5
5 2 .5 2 .5 2 .5 2 5 2 .5 2 5 2 5 2 .5 2 4 2 ~ 24 2 4
X 83 84 84 8 4 8 4 8 4 84 8 4 84 84 84 84
_Q_ H~ 98 I I 10 12 4 1~4 14 8 16 I '2 18 2 192 20 4
I 1.9 v 5 .4 5 .4 5 ~ 56 56 56 56 56 56 56 ~-6 5 .6
5 25 2 5 2 .5 2 .4 2 .4 2 .4 2 .4 2 .4 2 4 2 4 2 4 2 4
X 86 87 88 88 88 88 88 88 88 88 88 88
0 9 94 10 7 120 133 148 160 172 186 197 212' 2 ~ 3
2 .0 v 55 5 6 56 5 7 5 7 5 7 5 7 58 ~8 58 58 58
s 2 .5 2 4 2 4 1 2 4 2 4 24 2 4 2 4 2 3 23 2.3 2 3
I X 90 92 92 92 92 92 92 92 92 92 92 92
0 66 I )2 118 l j2 146 160 176 190 zc 21 229 241
2 .I
v 5 6 ~ 7 58 58 ~ 8 59 59 59 ~9 59 59 59
_s 2 4 2 4 2 .4 2 4 2 .4 2 .3 2 3 2 3 23 23 2 3 2 3
X 94 9~ 95 9~ 95 95 95 96 96 96 96 96
95 11 2 128 14 3 158 176 192 20 4 220 234 246 263
I 2 .2 v 5 7 58 59 5 .9 6 .0 6 .0 60 60 61 6 . I 61 6 I
5 24 2 .4 2 .4 2 .3 2 3 2 3 2 3 2 3 23 2 .3 2.3 2 .3
X 99 99 99 100 100 10 I 10 1 101 10 1 10 I 101 101
0 104 120 138 155 172 190 205 1222 236 251 266 283
2.3 v 58 5 .9 6 .0 6 I 6 I I 61 6 I 6 .2 62 6 .2 6 .2 6 2
~ 2 4 2 4 2 .3 2 .3 2 3 2 .3 2 . 2 3 2 .2 22 2 2 2 2
I X 103 104 10 4 105 105 I 05 106 106 10 6 106 106 106
0 1 14 132 150 168 18~ 20~ 222 237 2 52 269 288 303
2 .4 v 6 .0 6 .0 6 .1 6 2 6 2 6 3 6 .3 6 3 63 6 3 63 6 3
5 2 .3 2 ,3 2 3 2 3 2 3 2 2 22 2 2 2 2 2.2 2.2 2 2
X 108 108 I 9 I 9 I 9 I 9 109 110 II 110 110 110
I Exh ib it 11-3.1
REFERENCE U. S. DEPARTMENT OF AGRICULnJRE
I SOIL CONSERVATION SERVICE
tNGIN((IIHG & WATUSHID ,LANNING UNIT
IIOOMALL, rtHNSYl V ANIA
I
S I DE SLO PE 4: I •; 2 : I
VEGETATED n=0 .0 40
32 34 36 3 8 4 0
22 24 2~ 7 ~ 2 7 2 7 z 7 2 7
38 38 8 3 8
33 33 3J 33 33
_;)~ 16 38
30 30 3 0 30 30
3 .6 3 6 3 6 3 6 3 .6
37 37 37 37 37
4 1 4 3 4 ~ 4 8 •9
3 3 3 3 3 3 3 3 33
34 3 4 3 4 3 4 4
4 1 ( 41 4 1 4 1 4 1
50 52 55 58 60
3 .6 36 36 36 3 6
32 3 2 3 2 3 z 3 2
45 4 5 45 45 45
63 66 68 73 7_§_
3.8 38 3 8 3 8 3 .8
3 .1 3 .1 3 I 3 I I 3 I
49 49 49 4 9 49
74 '9 R2 R6 qo
4 .0 40 4 0 40 4 0
3 .0 3 .0 3 .0 30 3 0
~z. 2 52_ 52
84 90 95 I 0 105
4 .3 4 .3 4 3 4 .3 43
2 .8 28 2 8 2 8 2 8
56 56 56 56 56
99 I 110 1 lo 12 2
4 .5 4 .5 4 .5 45 4 .5
2 .8 2 .8 2 . B 2.8 2.8
60 60 60 60 60
116 122 127 I 4 14
4 .7 4 .7 4 ,7 4 .7 4 .7
2 .7 2 7 2 7 2 . 2.7
64 64 6 4 6 4 6 4
46 15 . 159
4.8 4 .9 4 .9 4 .9 4 .9
2.6 2 .6 26 2 .6 2 .6
68 68 68 68 68
144 154 164 17 180
5 .0 5 50 5 .0 . ~I
26 2.6 2 5 25 2 5
72 72 72 72 72
162 I 2 182 192 20 I
~2 ~2 ~ 2 52 52
2.5 2 .5 2 .5 2 .5 • 2 .5
76 76 76 76 7 6
179 19 0 201 2 12 222
5 .3 5 .4 · 54 54 54
2~ 2 5 2 5 2 5 25
eo 80 81 81 81
l~b Jlj z Z4
5~ 55 5 ~ 5 5 5~
2 .4 • 2 4 2 4 2 4 24
8 4 84 84 84 85
21 8 _n2 .24 0 25 3 266
57 5 7 5 7 5 7 57
2 4 2 4 2 4 24 2 4
89 89 89 89 89
2 6 I !52 265 2 76 288
58 58 58 58 58
2 3 2 3 23 2 3 2 3
9 2 9 3 93 93 93
255 2 I 286 jQ j l
6 .0 6 .0 60 6 0 60
2 3 2 3 2 3 2 3 2 3
97 97 97 97 97
280 297 313 328 340
61 6 I 61 6 .1 61
2.3 2 .3 2 .3 2 . 2 3
102 102 102 102 102
299 ;1 19 336 354 367
62 6 2 6 .3 6 3 6 3
2 .2 2 2 2 2 2 2 2 .2
106 106 106 106 106
321 34 0 359 378 39 2
63 64 6 4 6 4 64
22 2 2 2 2 2 2 2 2
I 10 110 Ill Ill Ill
TSC·NE· ENG .
I I I 0
SHUT I II ---0' ---
:!o
'
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
E
L
E
Y
.
ST
O
R
.
A
G
t
..
\
(
N
t;
L
.
)
(A
C
.
-
P
r
)
(J
/
C
f
o
7:?
o
.
;
(
o
"
r
u
tJ
o
e-
s
£
2
.
!
7
3
,~;
q
;
~
o
.
;
q
r
(
e
;
q
;
s
v
.o
.
za
,
s
e
;
q
z
~
6
.
3
3
B
iet
Z
-s
o
O
.
I
/
6
D
.
.
.
.
.
£;5
2
/
.
·
~
=
3.
1
(
7
!
}
(
4
)
A
'¥
z
:
-:
?
8
.
,q
t
,
;
,
h
~~
~ ~
z
o.
~l-?
1
'
(
(
/
)
~
QG.V. cf /T) : uO. '>I OJ;
:S
a
~
G":
:
,
_
.~-I A
·
'
I
I
/
8
~n
i
I
/u
:
o
.
.
:
J
'"
"
'
C.
o
~
·
R
l
~
e
~
'v
.
J
~
f
:
l
.
J
e
i
R
.
O
P
'
-
I
F
'
I
C
c:.
t,
q
h
J
N
'
O
\
O
E
.
(,
~
)
(c
~
~
)
Q
n
Q
(
r
T
'
)
(c
.
.
"
'
)
(.
.
F
.
.
.
-
)
(<
.
c
:
'
!
>
..
.
.
.
{
l
'
.
.
'
~e
Q:
.
.
-
-
·-·
·--
~
·--
-
·--
-
-
·-
-
...
..
-
·-
·-
·
..
.
__
_
-
-
·
-
·
0
0
_
Q
_
_
0
_
Q
_
_
_Q
_
_
_
--
-
--
-
-
C>
0
tf
J
.
I
/
.
2
o,
I
Lq
·
l
.
.
-
-·
;{
1
_
-
-
-
-
·
-
-
··
·
-
0
0
6
.
2
£
~.
2
'5
:,
?
0
."
3
0.
~
1
3
o
,
7
5
2
5
'
."
3
o
.
7
5
'
>z
.
t
/
/
.
0
t.
/
.
2
/.
2
'5
GL
/
.1_
/.
2
"
5
t>
7.
{
o
_
-
-
!
.
-
£
6
5
:
)
.
7
5
m:
z
_
j
,
{
t
;
;
~
.D
.
-
-
-
-
·
.
-
-
-
-
-
-
-
-
-
1
-
·
-
-
--
-
·
--
-
·
..
e.
~
R
.
~
~
L
I
1-
.
1
L
E
;
\
O
U
"
"
l
l
.
e.
T
a
..,
a
0
(~
T
)
(
(.
~
~
)
(
F
T
)
(<
P:S.
~
····
· ..
.
--
--
-
-
-
·-
-
-
-
·
·-
-
·
.
.
.
0
0
-
-
-
-
r
-
-
.:
L
.
L
2/
.
P
-
-
-
-
.J
/
.
z
5
'
2
6
I~
-
-
3D
5.
2
~
3
2
?
.-
-
6
3.
5
_
-
-
-
-
-
-
-
·
--
-
-
-
-
-
-·
-
-
-
-
O
U
T
F
A
L
L
01 ~\\"((("," WSE. (T•-.1..\.. 0) (c ;:">)
·-
-
-
-
/. 2 ;jq ·-'38. 3 --;t/.o /20.0 i )> G> rr1 I U'l -f 0 ;o )> (j) rn I -(/) n I )> ::0 G> rr1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
CURVZ NUMBZR COMPUTATION Vera -2 .00
Date: 08-08-!14
Date:
Proj•ct
County
ZNZINZR SUBDIVISION
ZACLJl Stat•: CO
Subtitle: DEVJlLOPJlD TO POND -ZND.55 8 -8-!14
COVER DESCRIPTION
FULLY DEVELOPED URBAN AREAS (Vog EtJtab .)
Imperv1ou• Area•
Paved parking lots, roofa, driveways
Street• &ad road•
Paved ; op•n ditch•s (~/rigbt-of-~ay)
OTHER A GRICULTURAL LANDS
Brush -bruab, weed, grass mix fair
fair
Total Ar•a (by Hydrologic Soil Croup}
Uaer : HN
Checked :
Hydrologic Soil Group
A B c
AcrtJtJ (CN)
1.1(!18)
2 .0(8!1)
1!1(5&) 112(70)
8(&0) !12(73)
30.1 204
D
TOTAL DRAINAGE AREA: 234.1 Acr•• WEIGHTED CURVE NUNIJF:R: 70•
• -Cenerat•d for uae by GRAPHIC method
TIME OF CONCENTRATION AND TRAVEL TINZ Version 2.00
Date: 08-08-!14 Project
County
ZNEIMER SUBDIVISION
EAGLE State: CO
Subtitle: DEVELOPED TO POND -ZND .55 8-8-!14
Flow Typo
Sbo•t
2 year
rain
2 .4
Sballo~ Concont'd
Open Cboru:uol
Open Channel
Length Slope Surface
(tt) (ft /ft) code
300
700
2!100
2100
0.25
0.40
F
u
---Sbeet .P"low Surface Codes ---
A Smooth Surface , Crass, Denae
UtJer: HN
Checked: Date:
n Ar•a Wp Velocity Time
(sq/ft) (tt) (ft /sec) (br)
l5
12
0 .241
0. 01!1
0.054
0. 04!1
Time of Concentration • 0 .36•
Shallow Concentrated
B Pallo., (No Rea .) c Craas, Burmuda Surface Code a
c Cul tivoted < 20 ' Rea. H Jtioods, Ligbt p Paved
D Cul tivat•d > 20 ' Re•. I H'oodtJ, D~Ul8fJ u Onpav•d
E Cr•••-Range, Sbort J Range, Natural
Can era ted for uae by GRAPHIC method
I e
···············•••80-80 LIST OF INPUT DATA FOR TR-20 HYDROLOGY******************
Is TR -20 FULL PRINT SUMMARY 100
TITLE 001 ZNEIMER POND w/ VEGETATED 18' SPILLWAY .r. 24" CHP llO
I TLE DEVELOPED SITE -(ZV18 .DATI 8/11/94 120
STRUCT 2 130
8 8189.25 0.0 0.0 lSO
i 8190.75 0.0 0.16 160
8190 .85 l.2 0.173 165
8191.00 4 .9 0 .194 170
8 8191.50 39.3 0. 265 180
I 8192 .00 75.0 0 .330 180
8192.50 123 . 0.400 190
9 ENDTBL 220
I RUNOFF 1 1 5 . 3658 70. 0 .36 1 0 0 0 1 230
RESVOR 2 2 5 6 8190.75 1 0 0 0 0 1 240
ENDATA 250
7 INCREH 6 0.10 260
I COM PUT 7 01 02 0.0 2 .4 1 .0 2 2 01 01 310
ENDCMP l 320
ENDJOB 2 330
llr *****************************END OF 80-80 LIST********************************
XEQ 08-23-94 13:55
REV PC 09/83( .2)
ZNEIMER POND w/ VEGETATED 18' SPILLWAY .G 24* CMP
DEVELOPED SITE -(ZV18 .DAT) 8/1 1 /9 4
I
llrECUTIVE CONTROL OPERATION INCREM
MAIN TINE INCREMENT • .10 HOURS
~CUTIVE CONTROL OPERATION COHPUT
FROM STRUCTURE 1
+ TO STRUCTURE 2
I STARTING TINE • .00 RAIN DEPTH •
STORM NO. • 1
2.40 RAIN DURATION• 1.00 RAIN TABLE NO.• 2
ALTERNATE NO. • l MAIN TINE INCREMENT • .10 HOURS
IIFERATION RUNOFF STRUCTURE 1
OUTPUT HYDROGRAPH• 5
AREA • . 37 SQ HI INPUT RUNOFF CURVE• 70 .
I INTERNAL HYDROGRAPH TIME INCREMENT• .0480 HOURS
I I RUNOFF
PEAIC TIHE(HRS )
1 2.16
23.67
~·OLUNB ABOVE BASEFLOW •
OPERATION RESVOR STRUCTURE 2
INPUT HYDROGRAPH• 5
PEAX DISCHARGE(CFS)
72.42
3.10
.41 WATERSHED INCHES,
OUTPUT HYDROGRAPH• 6 I SURFACE ELEVATION• 8190 .75
I PEAIC TINB(HRS) PRAX DISCHARGB(Cl"S)
TINE OF CONCENTRATION• . 36 HOURS
PEAX ELEVATION(FEET)
(RUNOFF)
(RUNOFF)
96.41 Cl"S-HRS, 7.97 ACRE -FEET;
PEA1C ELBVATION(l"EET)
110
120
JOB 1
RECORD ID
RECORD ID
ANT. HOIST. COND• 2
BASEPLOPf • .00 CPS
PASS
PAGE
1
1
260
310
I 12.19
23.65
II RUNOFF VO LUME ABOVE BASEFLOW •
IIJECUTIVE CONTROL OPERATION ENDCMP
+
I
IIJECUTIVE CONTROL OPERATION ENDJOB
.3.17
3 .10
8191.97
8190 .53
. 41 WATERSHED INCIIES , 56.25 CFS -HRS,
COMPUTATIONS COMPLETED FOR PASS 1
XEO 08 -23-54 13 :55
REV PC 05/83(.2)
ZNEINER POND w/ VEGETATED 18' SPILLWAY & 2 4• CMP
DEVELOPED SITE -(ZV18.DAT) 8/11/54
I
7 .55 ACRE-FEET; BASEFLOW •
110
120
SUMMARY TABLE 1 -SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED
I (A STAR(*) AFTER THE PEAJC DISCHARGE TINE AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH
A QUESTION HARJC(?) INDICATES A HYDROGRAPH WITH PEAJC AS LAST POINT.)
. DO CFS
RECORD I D
RECORD ID
JOB 1
STANDARD RAIN ANTEC HAIN PRECIPITATION PEAJC DISCHARGE
320
330
SUMMARY
PAGE 2
I CTION/
RUCTURE CONTROL DRAINAGE TABLE HOIST TINE -------------------------RUNOFF --------------------------------------
ID OPERATION AREA
(SO HI)
I
ALTERNATE
I ·RUCTURE
STRUCTURE
I
1
2
1 STORM
RUNOFF
RESVOR
TR20 XEO 08-23-.94 13 :55
I REV PC 0.9/83(.2)
.37
.37
l
II
2
2
COND
2
2
INCREN
(HR)
.10
.10
BEGIN
(HR)
.0
• 0
AMOUNT
(IN)
2 .40
2.40
DURATION
(HR)
24.00
24 .00
ZNEINER POND w/ VEGETATED 18' SPILLWAY t. 24" CMP
DEVELOPED SITE -(ZV18 .DAT) 8/11/54
AMOUNT
(IN)
.41
.41
ELEVATION
(FTJ
8191..97
110
120
~RY TABLE 3 -DISCHARGE (CFS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES
XSECTION/
I RUCTURE
ID
I TRUCTURE
ALTERNATE
W TRUCTURE
ALTERNATE
2
1
1
1
DRAINAGE
AREA
(SQ HI)
.37
.37
lEND OF 1 JOBS IN THIS RUN
I
I
STORM NUMBERS ......... .
1
73.17
72.42
TINE
(HR)
12 .16
12.19
RATE
(CFS)
72.42
73.17
JOB 1
RATE
(CSN)
198.0
200 .0
SUMMARY
PAGE 3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
11-54.9
DESIGN DATA FOR EARTH SPILLWAYS
STAG! $PtU.WA'f 1 ... 1 VIIRW!LE.! 8 10 12 IN •f_(T
6 8
v 2 7 2 7 2.7 0 .5 s 15 :5 1 5
X 84 84 84
I 12
0 .6 " 30 3 0 30
5 14 14 I 41
X 92 92 92
<J II I lb
0 .7 v · 32 32 3 .3
5 1.4 14 13
X lUI IOZ 102
0 lj 16 19
OB " 3 5 3.5 3 5
s 1.3 L3 I 3
X 113 II) 113
17 2 · 24
0 .9 v 3 .7 38 3 8 s 1.2 12 I 2
X 120 120 123
z 24 29
1.0 v 40 40 4 .0
s 1.2 1.2 I .2
X 13 I 131 13 I
:3 28 34
1.1 v 4 .2 42 4.2
s I. I I I I . I
X 141 141 141
4
1.2 v 44 44 4 .4
s I . I 1.1 I . I
X 148 148 lSI
u 32 38 46
1.3 v 4 .5 4.6 46
s 1.1 1.1 I I
X 159 159 159
}_. 44 51
1.4 v 4 .7 48 4 .8
s I I 1.1 I I
X 166 169 169
4 1 5• 58
1.5 v 4 .8 49 4 .9 s 1.1 II 10
X 177 177 17'9
4!i ~6 6:
1.6 v 5 .0 5 .1 !I I
s 1.0 1.0 10
X 184 189 189
0 52 62 72
1.7 v 52 52 5 .2 s 10 10 10
X 195 200 202
_u 58 69 I
1.8 v 5 .3 5 .4 5 .4
s 1.0 10 1.0
X 205 210 I 212
64 '6 88
1.9 v 5 .5 55 55
s 10 10 10
X 215 218 220
I 8 9
2 .0 v 56 5 .7 5 . 7
s 10 09 09
X 225 2. oj
7 91 10
2.1 v 57 58 5 .9
s 09 09 09
X 236 238 2 43
84 IOC 116
2.2 v 59 59 60
s ·.9 19 0 9
X 2 4 6 ~I 253
9• 108 I 4
2 .3 v 60 61 61
s 09 09 09
X 256 261 261
u 99 I If> I )6
2 .4 v 6 I 62 62 s 09 09 09
X 269 269 12 I
REFERENCE:
BOTTOM WIOTH (b) IN FEET
14 16 18 20 22 24 26 28 '0
I II I 14 I I I I
2_7 2 . 7 2 .7 2 .7 2 7 2.7 2 7 27 2 .7
I 5 I 5 I 5 15 I 5 I 5 I 5 I~ I 5
8 4 84 84 84 84 84 84 84 84
14 I 16 18 Z• 22 24 2.§ 28
3 .0 .3 0 30 3 .0 3 .0 30 J.O 30 30
1 4 14 1.4 14 1.4 14 14 14 14
92 92 95 95 95 95 95 95 95
18 25 2 8 .3• jj .35
3 .3 3 .3 3 3 3 .3 3 3 33 3 3 33 33
13 13 1.3 13 13 13 13 13 13
102 105 105 105 105 105 105 I 105 105
22 26 ~9 H 35 ~-8 42 4 46
3 .6 3 .6 3 .6 3 .6 36 3 .6 3_6 3 6 3 .6
I 2 I 2 12 I 2 I 2 I 2 12 I 2 I 2
113 liS 115 II 115 115 II I 15 115
28 32 35 39 43 4 7 I 53 5 7
3.8 3 8 3 .8 38 3 .8 38 38 3.8 3 .8
12 I 2 I 2 1 2 12 1.2 1 2 1.2 1.2
123 123 12 3 123 123 12 3 12 3 125 125
33 I 38 42 4 5§ _2_1 ~--65
40 4 .0 40 4.0 4.0 4.0 4 .0 4.0 4 .0
1.2 1.2 1.2 1.2 1.2 1.2 1.2 1.2 1 .2
131 133 133 133 133 33 133 3 13
39 44 49 54 6C 65 70 74 79
43 4 .3 4 .3 43 4 .3 43 43 43 43
1.1 1.1 1.1 I I 1.1 1.1 I. I 1.1 I. I
141 141 141 14 I 143 143 143 1 43 143
4 I 58 64 69 '6 80 86 92
44 4 4 4 . 45 4 .5 4!1 4 .5 4 .5 4!1
I. I I I II 1.1 1.1 1.1 1.1 1.1 I I
15 I 15 I 151 lSI 15 I 154 154 154 154
53 58 65 73 80 86 91 99 106
46 4 6 46 -4 7 4 4 4 .7 47 47
I I 1.1 II I I 1.1 1.1 I I 1.1 1.1
161 161 161 161 161 16 1 161 161 164
9 _bb '4 82 90 96 I 13 I 119
4.8 4 .8 48 4 .8 48 4 .8 4 .9 4 .9 4 .9
1.1 1.1 I I 1.1 1.0 1.0 10 1.0 1.0
169 169 I '2_ 1 •2 I 2 I '2 I 2 I 2 I r4
66 '5 85 92 10 1 I )8 I 16 I :5 1,3
'10 50 5 .0 5 .0 5 .0 5 .0 5 .0 5.0 5 .0
1.0 10 1.0 1.0 I . I I. 1.0 1.0 1.0
179 182 182 182 182 182 182 182 18 4
'5 84 94 I 4 II I 13: 142 149
5. I 5 .1 5 .2 5 .2 5 .2 5.2 5 .2 5 .2 5 .2
10 10 1.0 1.0 10 10 10 10 1.0
192 192 195 195 195 195 195 195 195
83 94 105 11 5 12o:i 135 145 156 167
!U 5 3 53 53 5 .4 5'1 5 .4 5 .4 5 .4
1.0 1 0 10 10 10 10 10 1.0 10
205 205 205 205 205 205 205 205 205
93 I 104 I I lb I 138 15C 16 I I 182
55 5 .5 55 5 .5 55 5.5 5 .5 5 .5 5 .6
10 09 09 09 0 .9 09 0 .9 09 09
21 5 215 I 2 I 5 215 215 215 215 215 215
102 11 4 127 14 152 164 I 188 z, I
5 6 1 56 56 57 5 .7 57 57 57 57
09 09 09 09 09 09 0 9 09 0 .9
22 3 225 225 2 25 225 225 225 225 225
Ill 125 I 138 I ·3 164 I 8 19 4 IH
57 5 .8
09 09
2 zj
I !2 I 15
59 59
09 09
243 I 24
I 3 I 14!>
60 6 0
09 0 .9
253 253
14 158
61 6 2
09 0 9
264 264
I I 0
6 3 6 3
09 09
2 74 2 74
58 5 .8 58 56 58 58 59
09 09 09 09 09 0 .9 09
z It> ~ lb :Jb z 6 £ )b z
149 162 I 192 207 z l' 234
59 59 60 6 .0 6 0 60 60
09 09 09 09 09 09 09
243 243 24 243 246 246 246
16. I 194 21 22 4 238 25
61 6 I 6 I 6 . I 6 I 6 .1 6 .1
09 09 09 0 .9 09 09 09
25 3 2!13 256 256 256 256 256
175 l'lc 18 226 2 43 '58 275
6 6 .2 62 6_1_ 63 6 3 63 o_ 09 L9. 09 09 0~ 09
264 266 266 266 269 269 269
189 206 2 4 241 260 275 294
6 64 6 4 64 6 .4 6'1 64
09 09 09 09 09 09 09
27_6 276 2'6 76 2 '9 2 r9 2'9
Exhibit 11-3.1
U.S. DEPAATWENTOF AGRICULTURE
SOIL CONSERVATION SERVICE
(NGINU.ING I WATUSHIO PlANNING UNIT
I•OOMAll, P ENNSYLVANIA
'" ...
SIDE SLOPE 2:f
BARE EARTH ns0.025
H 34 36 38 40
_Z 4 :~ :8
2 .7 27 2 7 2! ___g_
15 15 15 15 15
84 84 84 84 84
·2 34 35 I
30 30 30 30 30
1 4 14 14 14 14
95 95 I 9 5 95 95
ql 4 4q 4b 4t!
3 .3 3 3 33 33 3 3
I 3 I 3 I 3 1.3 13
105 105 lOS 105 105
48 51 54 57 60
36 36 •6 36 '6
12 12 I 2 12 1 2
II II 115 115 ll_!j_
60 64 68 71 75
3 .8 3 .8 38 38 38
I 2 12 12 I 2 1 2
125 125 125 125 125
7<: 81 86 9C
4 .0 . 40 40 4 0 40
12 1.2 1.2 I 2 12
13 13 133 133 13
84 89-95 100 105
43 4 .3 43 43 43
1.1 1.1 I I 1.1 1.1
14 3 14, 1 43 143 143
98 I 4 110 116 12 2
4 .5 45 45 4.5 4 .5
1.1 1.1 II I I 1.1
~~-· I 4 154 154 15 4
I 12 119 125 133 140
4 47 47 4 .7 4.7
1.1 1.1 1.1 1.1 I I
164 164 164 164 16 4
12 134 14 2 I I
4 .9 4 .9 49 4 .9 49
10 I . I. 10 1.0.
174 I '4 I 4 I 4 174
142 150 16C 169 I 8
5 .0 5 .0 51 5. I 5. I
1.0 1.0 1.0 10 1.0
184 18 4 184 184 18 4 -
1!18 168 78 I 7 I
!I 2 5 .2 5 .2 52 5.2
1 0 1.0 10 1 0 10
195 195 19_5 195 195
175 187 196 206 217
5 .4 5 .4 5 .4 54 54
10 10 10 10 10
205 205 205 205 205
194 0 4 2 14
56 5 .6 5 .6 56 56
0 .9 0 .9 09 09 09
215 215 215 215 215
21j 22 2 3~ 48 261
5 .7 5. 7 57 57 5 7
09 9 19 9 09
225 225 22!1 22!1 225
l3; ~4 2 ~6 269 83
59 59 59 59 59
09 0 .9 09 0 .9 09
6 2 6 z )t) I ~ >6 6
250 267 2 76 291 J05
60 6D 60 60 60
09 09 09 09 )9
2 46 246 246 246 246
2 69 288 301 314 330
61 6 .2 62 62 6
09 09 09 09 >9
256 2!16 256 256 256
29 31 6 12 41 ll4
6 3 6 . 6 .3 6 .6_
19 09 I 'I 0'1 O_q
269 26 9 269 269 269
312 327 346 364 378
64 6.4 6.4 64 64
0 .9 0 .9 09 0 .9 09
2 '9 _ c_~ Zf9 _ zrg 2'9
TSC-NE-ENG.
I I I 0
IH!:lT • II
I • ******************80-80 LIST OF INPUT DATA FOR TR-20 HYDROLOGY******************
I. TR-20 FULLPRINT
TITL.E 00~ ZNBIJID POND w/ BARB' BARTH 18' SPILLWAY a 24 • CMP
I TLB DBVBLOPBD
STRUCT 2
8
i
8
I
9 BNDTBL
I RUNOFF 1
RB'SVOR 2
BNDATA
1
2 5
7 INCRSN 6 I COIIPUT 7
IlNDCNP 1
01
RNDJOB 2
SITS -(Z1B.DAT) 8/11/94
8189.25
8190.75
BUD. 85
8191.00
8191.50
8192.00
Bl92.5D
5 . 3658
6 8190.75
0.10
02 o.o
0.0
0.0
1.2
4.9
38.3
74.0
120.
70.
2.4
llr*****************************RND
0.0
0.16
0.173
0.194
0.265
0.330
0.400
0.36
1.0
1 0 0
1 0 0 0
2 2 01
0 1
0 1
01
100
110
120
130
150
160
165
170
180
180
190
220
230
240
250
260
310
320
330
ZBO 08-11-94 16,23
RSV PC 09/83{.2)
ZNBIJillR POND w/ BARB' EARTH 18' SPILLWAY & 24• CJIP
D~LOPSD SI7.8 -(Z18.DAT) 8/11/94
I
BZBCUTIVB CONTROL OPERATION INCRBX
I , JIAIN T'DIB INCRZJIBNT • .10 HOURS
CONTROL OPERATION CONPUT
FROII ST'RUCTURB 1
TO STRUCTIIRB 2
•
STARTING TINB •
ALTBRNATB NO. • l
.00 RAIN DEPTH • 2.40 RAIN DURATION• 1.00 RAIN TABLB NO. • 2
I STORN NO. • 1 MAIN TINB INCRJlKBNT • .H HOURS
I BRATION RUNOFF STRUCTURB 1
OUTPUT BY.DROGRAPB• 5
AR.IA• • 31 SQ JIZ INPU'r RUNOFF CURVB'• 70.
I
I
I
I
Ilr.I'DNAL HYDROGRAPH TID INCRBJDlN'r• • 0480 HOURS
PJWI: TIJIB{HRS}
12,U
23.67
RUNOPP VOLVXB ABOVB
BTRUC~ 2
IHPUT BrDROQRAPH• 5
PSAK DISCHARQS(C,S}
72.42
3.10
OUTPUT HliDROQRAPR• 6
SUR,ACS SLBVATION• 8190,75
PJWr TIJIB{HRS)
12.19
P&AX DISCRARQS(C,B}
73.15
TID OP CONCB'N'Z'RATIOJI• .36 HOURS
PBAX SLBVATION(,SST}
(RUNO,,}
(RUNO,n
96.41 CTS-BRS,
PBAX SLBVATION(,SZT}
8191.!1!1
110
120
JOB 1
RECORD ID
R.BCORD ID
ANT. NOIS'l'. COND• 2
. 00 c,s
PASS
PAGX
1
1
260
310
I 23.69 • 3.10 8190.93
.IIRUNDFF VOLUHB ABOVB BASBFLOW • . 41 PIATDSHBD INC'IIBS, 96.26 CFS·HRS,
rCUTIVB CON'l'ROL OPBRATION BNDCMP
COMPUTATIONS COMPLBTBD FOR PASS 1
I
BXBCUTIVB CONTROL OPBRATION BNDJOB
I
T.R20 XBQ 08·11·94 16:23
I RBV PC 09/83(.2)
ZNBINER POND w/ BARB BARTH 18' SPILLWAY a 24• CMP
DBVBLOPBD SITB -(Z18.DAT) 8/11/94
7.!16 ACRil·FBrr; BABBFLOW •
110
120
~lf TABLB 1 BBLBCTBD RESULTS OF STAMDARD AND KXBCUTIVK CONTROL INSTRUCTIONS IN THZ ORDBR PBRPOR«Ka
(A STAR(•) Al'TBR 'l'HB PltU' DISCHARGB TiliB AND RA2"B (CFS} VALUBS INDICATBS A FLAT TOP HYDROQRAPH
A QUBSTION JIARIC(?} INDICATES A HYDROGRAPH 'NI'!'Il PBAIC AS LAST POINT. )
• 00 CFS
RECORD ID
RECORD ID
JOB 1
ICTION/ STANDARD RAIN ANTBC MAIN PRBCIPITATION PDX DISCHARGB
STRUC1'!1RB CONTROL DRAINAGB TABLB HOIST TIIIB ·---------·--------------RUNOFF
ID OPERATION ARBA
II (SO NI)
1 BTORN I ALTBRMATB
STRUCTURB 1 RUNOFF
RESVOR
uo 08-11-94 16:23
RBV PC 09/83( .2)
I
.37
.37
1
• COND INCRBJI BEGIN AJIOUNT DURATION AMOUNT
2
2
2
2
(HR)
.10
.10
(HR)
.o
.o
(IN)
2.40
2.40
(HR)
24.00
24.00
ZNBiliBR POND w/ BARB BARTH 18" SPILLPIAY a .24• CliP
DBVBLOPBD SITB -(Z18.DAT) 8/11/94
(IN)
.41
.41
BLBVATION TIHB
(FT)
8191.99
110
120
(HRJ
12.16
12.19
rr TABLB3
lzc:rxos;
-DISCHARGB ( CFS) A :I' 1CSBC2'IONS AND BTJIUCTURBS FOR ALL STORNS AND ALRRMATBS
0 BT.RUC1'!1RB 2
I ALnRMATB
0 STRUC1'!1RJr 1
1
Dl!AINAGB
AND
(SO III)
.37
.37
lAL2'.RNAT~ l
OF 1 JOBS IN TIIIS RUN
II
II
STORN NUNBDS ..••• , • , ••
1
73.15
72.42
RATJr
(CFS)
72.42
73.15
JOB 1
320
330
SUNNARY
PAGJr 2
(CSIII)
198.0
200.0
SUJINARlf
PAGJr 3
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
• Open Channel -Un1tor. tlow
Worksheet Name: ZN
Comment: ZNEIMifR
Solve For Depth
Given Input Date:
Left Side Slope •.
Right Side Slope.
Hanning's n .•...•
Channel Slope ••..
Discharge ....•.••
Computed Results:
Depth ........•.••
Velocity •....•.••
Flow Area ....•. ,.
Flow Top Width .••
Wetted Perimeter.
Critical Depth ...
Critical Slope .•.
Froude Number ....
15.00:1 (H:V}
15.00:1 (H:V}
0.050
0.0950 ft/ft
72.42 cts
0.94 ft
5.51 tps
13.14 st
28.07 ft
28.l4 tt
1. 08 tt
0.0449 ft/tt
1.42 (tlow is Supercritical}
Open Cbannel Flow Nodule, Version 3.41 (c) 1991
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
'
ao
0
0
0
ru
ZNEIUER SUBDIVISION
DRAINAGE EASEMENT REVISION
TRACT A, UA ZNEIU£R SUBDIVISION
TOWN OF VAIL. EAGI F COUNTY, COLORADO
I
N OI'J:;'~· E
J8.5r'
-8180 -;-~
I I
' I I
E:XIST. EDGE: OF ASPHAL
±8206.05
(EXISTING}
I
I (
I
·~ I
t
I
I
I
•
/
/
/ "' / ':! /
0
/
/
/
/
/
/
/
/
/
/--
/
/
/
I:\OWG\Z\INE1W20.0WG
I
SCALE 1" -20'
ENGINEERING INC.
EDWARDS BUSINESS CENTER • P.O. BOX 97
EDWARDS, COLORADO 81632
• 30.3 926-3373 • FAX 926-3390 •
SHEET
2 OF 2
JOB# 98024
.D c
EXIST EDGE OF ASPHALT----...
ZNEIMER SUBDIVISION
POND MOD/FICA TION :±8206.05
(EXISTING)
TRACT A, UA ZNEIMER SUBDIVISION
TOWN OF VAIL. EAGLE COUNTY, COlORADO
EXIS1l NG EAR1lHEN
DA M
PROVI DE 4' TOP SOIL
WITH REVEG ET ATION
4.0' 18.0' 4.0'
EXISTING EAR THEN
DAM
SPILLWAY SECTION N 71'01'39" E
:JO.!U'
N 01'35'59" E
38.51'
N.T.S
I
/
/
SEWER MANHOLE
(TYPI CAL)
/
/
/
/
/
,..-
/
---
I
I
I
I
~ 1 P'<O~JE L D I A.
"'C'-ID "'SE"i:.
(SE::: DE -t.I L '
-oP =9 o.-s
N\=86 .-5
D"QVIDE 2 ' X 2'/X 2 '
CONCREt: 1Nt£'T w I
GRA t:. (POt>~{) DRA ,N)
(SEE !JtT AIL )I 89 .25
I
I
J ;;·
I
-+-
N 21 "50'26" W
20.91'
I
I
/ TOP =89.25
~ · ll'o.Y=8 7 .25
0 ROVIDE A GEOSYNTHE~C
WA ITR 0 ROOF L NER SUCH
AS 60 MIL VLDPE OR EQU I V.
UP -o ELEVATION 8191.0 .
+
PROVIDE 8' VAL YE
AT END 8' DIP
INSIDE MH RISER.
(NORMALLY CLOSED )
100 YEAR STORM
WATER SURFAC E
ELEVATION=81 9 2.
/
89.2 5 /
+ ~
./
./ /
r ,
/
/~~/
/
/
/
/
/
/
___ ...,.,
·' ..
89.2)
+
'I
J
I
I
I
I
I I
I
I
I
I
v
I
I
• I
I
I /
!
;'
;'
I
I
I
I I I I
I !
2 4 ' CMP
6' WIN
PRn'IIOE NON-SHRINK GROOT .._T "PE--"' m t.IAN-iot..E c::ot.tfEC'TlONS
/ (MIN.
F. OF 2 -.36u CM
MIN. SLOPE.
/ PROVI
I COVER OVER PI
FLARED END
SECTI
--
TO PROVIDE s• OPENING.
FHAtr.I E AND CO'vf:R
D & L A104J OR EQUA L
TO BE C "ST IN UO.
S EACH SIDE.
./
/
). /
/
/ ~ / c; ./
./
/
/
/
/
SQUARE INLET FRAME & GRATE
INSTALL 1' IDI.4METER RUS'R-NEK
(OR EQUAL) JOINT GASKET AND GROUT
JaNTS INSID>£ AND OUTSIDE, GROUT UFT
HO\.£S ON I~"''TERIOR, INSTALl 1 1/2'
DIA!.IETER RWB'R-NEK 00 MANHOLES
\riii\NHOl£S LARGER TI-IAN 48'
t • i
I •
/
FRAME & GRATE
POl PI...I.N,L:;jlf==~=~s;-
NON-SHRINK
GROUT
SfCTION A
WJER AI NOTf
1. ,6,U. CONCffiElE WORK SHALL COMPLY 'MTI-! LATEST
ACh 518 SfPECIFICA110NS 2' SQUARE
INSIDE Dll.iEN.
Z SQUARE PRECAST BOX DETAIL
AREA INLET
/
/
SCALE 1" -10'
SHEET
1 OF 2
NTS ENGINEERING INC.
POND RISER TOP EDWARDS BUSINESS CENTER • P.O. BOX 97
EDWARDS, COLORADO 81632
NTS • 303 926-3373 • FAX 92&-3390 • JOB# 98024