TOWN OF VAIL
75 S.FRONTAGEROAD
VAIL, CO 81657
97U479-2138
DEPARTMENT OF COMMUNITY DEVELOPMENT
-b.d"t --'- "d5
ftr ul\r.\-\l-o
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TrMES \XOO6
ADD/ALT MF BUILD PERMIT Permit #: 805-0205
Job Address.: 4504 TIMBER FALLS CT VAIL Status.....: ISSUED
Location......: TIMBERFALLS # 2006 Applied...: U7126/2Ns
Parcel No....: 2l0ll23l2ffi Issued...: 08/15/2005
ProjectNo...: ?RSOS - O31L Expires...: O2llll2ffi6
owNER CAREY, MTCHAEIJ ,t. & wEt[Dy M.,7/26/2OO5
6817 EIJAINE WAY
SAN DIEGO
cA 92L20
APPIJTCAIqT NETT DEsrcN coNsTRucTroN 07/25/2005 phone: 9i0-476-sssa
P.O. BO){ 2t77
VAII.,co 81658
License: 290-B
CoI.ITRACTOR NETT DESIGN CONSTRUCT]ON 07 /26/2005 phone: 970-476-s5sa
P.O- BOX 2177
VAII.,co 816s8
License:290-8
Desciption:
remove upper portion of non bearing kitchen wall, non
bearing master bed closet wall, move door for master bath
Occupancy: R-2
Type Construction: V-A
Type Occupancy: ??
Valuation: $31,000.00
Fireplace lnformation: Restricted:
Building--- > $451.85 Resnlarant Plan Review- >
Plan Check--> 3293 .70 DRB Fee--*--------- >
Add Sq Ft: 0
# ofcas Applianc€s: 0 # ofGas l-ogs: 0 #of Wood Pellet: 0
FEE SUMMARY *tl(**{.!i*t***********ti*:l.t*'}:t:1.:r+,t(****+:t++{'{+{':l'*:*'t:lr:}************
So. 00 Total Calculated Fees- > $748 .55g0.00 ArkLitional Fees--------> $0.00
$0.00 Total Permit Fee----- > $?48.55
s748.55
$0.00
lnvestigation- >
Will Call--- >
$0. 00 Recreation Fee--------->
g3 . oo Clean-up Deposit------ >$0.00
TOTAL FEES-----------> S?48. ss BALANCE DUE------ >
+t+++|++*'t+|t***:.*{t*****dt*'}***'}***d!d!*d!i.+**'*****:t(**,t{.*.t*!t*****i!***,.**,<l:*************
Approvals:
rten! 05100 BUIIJDING DEPARTMENT
oe/tL/200s cgunion Action: AP see conditions
Item: 05400 PL,ANNING DEPART!{EMr
ITEM: O55OO FIRE DEPARTMEMT
Item: 05500 PITBIJIC WORKS
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this apptication, filled out in full the information required, completed an accurate plot
PAGE 2******i(*******{.{.rF*tlt{.****************************'t 't{r't ***+***lc*(*{.**{r*********!N(*****{.***{<{.*****'t *d!*****,r:B{<*
CONDITIONS OF APPROVAL
Permit #: 805-0205 as of 08-15-2fi)5 Status: ISSUED,t**************,*1.,|3:1.********t'****{.tr*r.**t**1.*********************+i(*ir***********.****{.*d.****r*:t(***t<t<*******:k
Permit Tlpe: ADD/ALT MF BLIILD PERMIT Applied: 07126nm5
Applicanu NETT DESIGN CONSTRUCTION Issued: 08/15/2005n0476-555L To Expire: 02llI/2W
Job Address: 45M TIMBER FALTS CT VAIL
Location: TIMBERFALLS # 2M
Parcel No: 2l0ll23l2ffi6
Description:
remove upper portion of non bearing kitchen wall, non
bearing master bed closet wall, move door for master bath
Conditions:
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQIIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 14
(BLDG.): ALL PENETRATIONS IN WALLS, CEILINGS, AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond: I
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY
WORKCAN BE STARTED.
Cond:40
(BLDG): (MFR/COMM) FIRE AI-ARM REQLIIRED PER NFPA 72.
Cond: CON0007425
1) FIRE DAMPERS REQI.JIRED AT NEW EXHAUST FANS IN THE I HOUR
CEILING
2) FIRESTOP ALL NEW PIPE PENETRATIONS IN THE FLOOR
3) PROVIDE MINIMUM CLEARANCES AT FIXTI.]RES PER 2OO3 IPC AS
NOTED ON PLANS
4) MAINTAIN 1 HOUR RATING AT ALL BEARINC WALLS.
5) FIRE ALARM/SPRINKLER MODIFICATIONS MAY BE NECESSARY.
CONTACT VAIL FIRE DEPT.
plan, and'state that all ttre information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design
review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUES'TS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOTJRS IN ADVANCE BY AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4
PM.
SIGNATTJRE OWNEROR CTOR FOR HIMSELF AND OWNEF
*********+++**+***1.****t*************+++++********'&*******,t'*+********!t ********+*************
TOWNOFVAIL, COLORADO Stat€ment*++++++**{.***********'r**********++***!t***+***************+****'t***********'t:t+**++****,}*+***+
Statement Nuriber: R050001305 AmouDt: i74g.SS OS/LS/2OO504:37 Wl
Payment Method: Check fnit: I_,7
Notation: Nett Design /
2573
Permits No: B05-020S TIE)e: ADD/AIT MF BUfLD PERMIT
Parcel tilo: 2707-723-72OO-6
Site Addreas: 4504 TIMBER FAJ.rLS CT VAILLocation: TTMBERFAIJJS # 2006
Total Fees: 5748 - 55
This Payment: $?48,55 Total AIrr pmt6: g?48.s5
Balance: $0.00****+*++*************!t*'8*:******+**+***************!t***+++**********'l****+**********'*****++**
ACCOUNT ITEM LIST:
Account Code DescriDtion Current Pmts
BP OO1OOOO31111OO BUTI,DING PERMTT FEES 451.85
PF 00L00003112300 pIrAN CHECK FEES 293.70
wc 00L00003172800 wfIJIr CALL TNSPECTTON FEE 3.00
OR
Project #:
Buildi
VAIL BUIL PE
are required for electrical,
GONTRACTOR INFORMA
I r. + ... - r.^'t:. .. , -it_ . - .-t .. '-r;Y Vn rr- G !rIt ltJ ltlt r**
f'e-. Lt {---\ *-t \i
rl
tl
Questions? Call the Building Team at 479_ZIZB
)
Depadment of Community Development
Project Namel P*,
Project Address:
{P* euoti, way Permit application included if applicable (refer to public works check{ist)
{ff sylsns plan included (refer to Public works checklist) No dumpster,paikinq or material storage
illA"
Asbestos test and results submitted if demolition is occurrino
Architect stamp and signature (All Commercial and Multi far;iv)
Full floor-plans including building sections and elevations(4 sets of plans for SFR and Duplex, 5 setsof plans for Multi-Family and Commercial Buildinos)
Window and door schedule
Full structural plans, including design criteria (i.e.loads)
Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
Soils Report must be. submitted prior to footing inspection
,{F Fire resistive assemblies specified and penetrations indicated
f/h Smoke detectors shown on ptans
,J/& Wp"rand quantity of fireplaces shown
CAk y
Mcrl , L"
el**tliim*il"t#*#m#ruifl#ffi,u**rr{"!/M:'T{:{*'
Fee Schedule for calculations)
/fu Comptete site plan submitteO'
tfto
ftq
{n"
,//F
I have read and understand the above listed submittal requirements:
Applicant's Signaturei
Date of submittal:
F:\Users\JSuther\newBLDGPERM.DOC
Received By:
07 t28t2004
ll
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works)
review and approval, a Planning Depadment review or Health Department review, and a
review by the Building Depadment, the estimated time for a total review will take as long
as three (3) weeks.
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser
amount of time. However, if residential or smaller projects impact the various above
mentioned departments with regard to necessary review, these projects may take five
(5) weeks to review and approve.
Every attempt will be made by this department to expedite this permit as soon as
possible.
I, the undersigned, understand the plan check procedure and time frame. I also
understand that if the permit is not picked up by the expiration date, that I must still pay
the plan check fee and that if I fail to do so it may affect future permits that I apply for.
Agreed to by
n ---' -., h l'5z.ao',JofT
Project Nu ", ChnrY f?e-t,au.cs-
our", 7/zt/o i
F:\Users\JSuther\newBLDGPERM.DOC
Signature
07t28t20M
rl
Horv it relates to Building Permits:
Fill out the atbched check list with the Buildinq Permit Annlication.
if yes was answered to any of the questions tren a 'Public Way" permit is required. You
can pick up an application at either Community Developmen! locabd at 75 South Fronhge
Road or Public.Works, locaEd at 1309 Elkhorn Drive.
Nob'ce sign-offs for utility companies. ALL utilities must field verifu (locate) .respective
utilities prior to signing application. Some utility companies require up to 48 hours notice to
schedule a locab.
A construction traffic control lsbging plan must be prepared on a separcte sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, sbaging, etc.). This
plan will expire on November 1st and will need to be resubmitted for considemtion for
approval hrough the winter. Be aware that your resubmission for winter may be denied
depending on the location of construction.
Skehh of work being performed must be submitted indicating dimensions (length, widfll
and depth of work). This may be drawn on the traffic control plan or a site plan for the j-ob.
Submit completed application to the Public Work's office for review. If required, locabs will
be scheduled for the Town of Vail electricians and irrigation crew. The locates bke place in
the moming, but may require up to 48 hours to perform.
The Public Work's Constructon krspector will review the applicatlon and approve or deny
the permit. You will be conbcted as to he status and any requiremenE that may be
needed. Most permib are released within 48 hours of being received, but please allow up
to one (1) week to process.
As soon as the permit is approved, the Building Departnent will be notified, allowing the
"Building Permit" to be released. Please do not confuse the'Public Way Permit" with a
"Buildinq Permit".
F NOTE: The above process is for work in a public way ONLY. Public Way
Permits are valid only until November 15$. A new Public Way Permit is required
each year if work is not comptete. R.e-application each l'lovember 15th does not
mean an automatic renewal. (
I have readI
Signatu re
Fr\UsersuSuthe^newBLDGPERM.DOC
Z/r;4r
e above.
Date Signed
07 t28t2004
PRJ #:
APPLICATION PW #:
FOR TO\ryN OF VAIL parcel #:
PUBLIC WAY PERMIT 20_--- Bldg. Pernrir #: E _ _ -
T0ilnm
. l.
) Job Narre Street Address
(ll'unfurown cnll
2. 179_t I ?q I
Excavating Contractor Nante Mail Address 'l OV Conlractor License Number - REQUII{ED
City State Phone #
3.
Stad Date Completion Date (Permit Expiration Date)
4. Work is for (circle one) Water Selr'cr Gls Elcctric Telcphonc CATV Landscaping Tcmp. Site Acccss
O(hcr
5. 'ftench-width Length Depth
(min.4')
Bond Amount $
Total SF $
zip
Total LF
Total Peflnit -Fee $Permit i'-ee $
6. ALL MATERIAL, EQUIPN,IENT, AND TRAFFIC CONTROL DEVICES MUS'I'BE ON THE JOBSITE BEFORE THE JOB IS STARTED.
7. Rubber out-riggers arc required on excavating equipnrent when working on asphait. Asphait surfaces underneath the bucket and lugs shall
be protected at all tirnes.
8. A signature below indicates a review ofthe arca and utility locations and apploval. Once all utiiity company signatures are obtained ,
pernrittee has option of routing application lhrough the Public Works office to obtain thc necessary 'I'orvn of Vail siguatures.
P)ease allow up io one rveek to process.
. Xcel Energy / Public Service Cornpany (l-800-922-1987)
Xcel Energy I'Iigh Pressure ( I -800-922-1987)
Quest (l -800-922- 1987)
Corncast Cable ( I -800-922- l C87)
Eagle River Water & Sanitation District (970-476-7480, exr. 1 l4)
Holy Cross Electric Company ( I -800-922- 1987)
'f -own of Vai I Electricians (970-47 9 -2 | 58)
Town of Vail lrrigation (970-479-2 I 58)
THERE Wll-L BE NO TOTAL STREET CLOSURES! A construction tral'ilc control plan ntust bc sutrrrriLtccl nd approred b1 Lhe l>Lrhlic Works Depanmetr
pr,oI t.'. is'uarrcc <rf the perrnit.
9. All excavation nust be done by hand within 18" ofutilities - (Senate Bill 172).
forfeiture of bond money. Scheduled inspections that are not ready may result in the Town charging the contractor a reinspection fee.
11. I celtifu that I have read all chapters of Title 8 - Public Ways anrl Propert1,, of the Vail Municipal Cfte arrd all utility Conrpany agreements, slgneo
by ure, and will abide by the same, and that all utilities have been notified as required.
Clontfactor's Sigtrature rrf Agrccrrent Print nanrc cleally .Date otisignatur.e
ATTACH PLAN OF WORK,INCLUDING CONSTRUCTION TIIAFFIC CONTROL PLAN White - Public Works
Show strcet with names, buildings, and locarion of cuts. USE DASII LINES FOR CUT. Yello*, - Contractor
FlUsersuSutheAnewBLDGPERM.DOC 07 t2812004
WHEN A *PUBLr WAY PERMIT" XS REQUIRED
PIEASE READ AND CHECK OFF EACH OF THE FOLLOW]NG OUESTIONS REGARD]NG THE NEED FOR A.PUBLIC WAY PERMff":
Is this a new residence? yES NO
tr
tr
B
o
o
Does demolition work being performed require the,ufifthe Right-of-Way, easemenB or
pubfic property? yES__- NO_l/: ,/
Is any utility work needed? YES NO 7
Are there any improvements being done to the driveway ? YES NO
ls a different access needed b the site other than the existinq drivewav? YES NO ,r/
propedy?
Is a "Revocable Right-of-Way Permit" required? YESB
o
Is any drainage work bglrrg done that affecE he Right-of-Way, easemenb, or publicYEs_ No t/
NO-J/
Is the Right-of-Way, egrdmenb or public property to be used for staging, parking or fencing?YES- NO V
If answer is NO, is a pa$in{, staging or fencing plan required by Public Works?YES_ NA l/
If you answered YES to any of these questions, a "Public Way Permit" must be obtained.
"P ublic Way Permit" applications may be obtained at the Public Work's office or at Community
Development (a sample is atbched). If you have any questions please call Leonard Sandoval in Public
Works at 479-2198.
ALL THE ABOVE OUESTIONS.
fuf &s:rd,n, do'-Tz-o nn,'/
Comoanv Name
J><
Contmctor Signature
Job or Project Name: (+na\ 2t.<rourne d
Date Signed:
F:\Users\JSuther\newBLDGPERM.DOC
F ' /o wa n rnna /fn rmc tts.t.1q164
I HAVE READ AND
07 t28t2004
ll
DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WOR.KS!
Please read and check off each of the items below:
The Town of Vail Building Depaftment has developed the following procedures to ensure that new
construction sites have adequately established proper drainage from building sites along and
adjacent to Town of Vail roads or streets.
The Town of Vail Public Works Department will be required to inspect and approve drainage
adjacent to Town of Vail roads or streets and the installaLion of temporary or permanent culverts at
access points from the road or street onto the construction site. Such approval must be obtained
prior to any requests for inspection by the Town of Vail Building Depaftment for footings,
temporary electrical or any other inspection. Please call Leonard Sandoval at479-2198 to request
an inspection from the Public Works Department. Allow a minimum of 24 hour notice.
Also, the Town of Vail Public
installation with resulting road
Final Ceftificate of Occupancy
Agreed to by://l
Works Department will be approving
patching as necessary. Such approval
issuance.
all final drainage and culveft
must be obtained prior to any
Print Name
Signature
Project Name:
Date Signed:
F:\Users\JSuther\newBLDGPERM.DOC 07t28t2004
lt
MATER.IAL STORAGE AND CONSTR.UCTION PARKING
Please read and check off each of the items below.
(Copies of complete text are available upon request)
CODE 5-2.10: DEPOSITS ON PUBLE WAYS PROHIBITED
Unlawful deposiE: Subject to subsection C thereof, it is unlawful for any person to litter, track or
deposil or cause to be littered, facked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or anypher debris or material upon any stree! sidewalk, alley or public place, or any portion thereof.
d Notice; Abatement: The Director of Public Work may notifu and require any person who violates or
causes anoher to violate the provision of subsection A hereof, or who has in the Director's employment
a pe6on who violates or causes anodrer to violate the same, top remove such sand,.gravel, rock, mud,
dirt, snow, ice or any other debris or material within twenty four (24) hours afur receipt of said notice
by Sre Direcbr of Public Works. In the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Works, or oher auhorized agent, may
cause any such sand, gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed
from any street or alley at the expense of the notified.
/ Sumnrons and Penalty: As an alternative to the notice for removal provided in subsection B above,
any person who violates or causes another to violate the same, may be issued a summons to appear
before the Municipal Court of the Town for said violations, and upon being found guilty of a violation
,hereunder be punished as provided in Secb'on 14-1 of this code.
ff Noti.. and Penalty: It is unlawful for any person to fuil or refuse to comply with the notice of the
Director of Public Work as provided in subsecb'on B hereof, and any such person shall, in addition to
payment of the expense of removal incurred by he Director of Public Works, as provided in subsecb'on B
hereof, upon being found guilty of a violatjon hereunder, be punishable as provided in Section 1-4-1 of
this Code. (1997 Code: Ordinance 6 (1979).
CODES 7-3A-1 AND 7-3A-3: PA,RKING OBSTRUCTING TRAFFE & II,IPOUNDMENT AUTHORIZED
g/ No person shall part any vehicle upon a sfeet or at any
manner or under such conditions as to interfere with the
sfeetor highway maintenance. (Ord. 2(1968) 5 1)
other place within this Municipality in such a
free movement of vehicular tmffic or proDer
g,/Whenever any police officer finds a vehicle attended or unattended, shnding upon any portion of a
sh'eet or upon any place Wthin flis Municipality in such a manner as to constitute a violation of any
section of this Article, or left unattended for a period of twenty four (24) hours or more and presumed b
be abandoned under tre conditions prescribed by Colorado Revised SbtLrtes section 42-4-1102, as
amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in
storage in the nearest garage or odrer place of safety designated or mainbined by fiis Municipality, and
the charges for towing and storage of such vehicle shall be charged to the owner of Ure vehicle in
addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) $ 3: Ord. 28(1981) q 1)
I have read and will comply with the above code provisions:
Position or Relationship to Project:
DwEBg.igtsufr'reAlewElpeqEEM. pQs_
Srr'<o "ve- rt
07 t28t2004
tt
Town of Vail Survey
Community Development Department Russell Forr'est, Director,
(e70) 47e-213e
Check all that apply
Date:
1. Which Department(s) did you contact? Building--- Environmental_Housing_Admin--Planning--DRB_PEC=..--
2. Was your initial contact with o ur staff immediate slow or no one available ?
3. lf you were required to wait, how long was it before you were helped?
4. Was your project reviewed on a timely basis? Yes/No
lf no, why not?
5. Was this your: first time to file a DRB app_PEC app_
Bldg Permit_ N/A--
6. Please rate the performance of the staff person who assisted you:
5 4 3 21 (5 is high) Name:
responsiveness, availability)
7. Overall effectiveness of the Front Service Counler. 5 4 3 21 (5 is high)
8. What is the best time of dav for vou to use the Front Service Counter?
8. What comments do you have which would allow us to better serve you next time?
Thank you for taking the time to complete this survey. We are committed to improving our service.
(knowledge,
F:\Users\JSuther\newBLDGPERM. DOC o7128t2004
Vail 2005
Vail Village and Lionshead Vitlage Construction Hours
Information Handout
The Vail Village and Lionshead Village are invaluable assets io the community. Thousands of
people come to Vail each year to sightsee, recreate, shop and to enjoy everything the Vail Valley
nas Io oner. Ine community and merchants rely upon our guesis lo generate revenue. Our
summer/winter guests expect a pleasant experience while in Vail.
To insure that all of the proposed construction has as little negative impact on the community and
on our guest as possible, the Town of Vail finds it imperative to create and implement the Vail
Village and Lionshead Village Construction Hours Handout.
It would be irresponsible {or the Town of Vail, the Construction Contraclors and the Merchants, to
not actively participate to minimize the impact of construction in the Vail and Lionshead Village
areas.
New for 2004-2006 will be the Vail Village Streetscape lmprovement Project. Work to include
all utility related improvements, streetscape, drainage, snowmelt systems and landscaping.
All construction projects and/or remodels within the Vail Village Core Area should contact
Scott Bluhm, Town of Vail Streetscape Coordinator, at 970-477 -3418 for further information.
Givens
The following givens are intended to provide the basic foundation by which construction will be
completed in the Villages:
The public's health, safety and welfare shall be honored at all times.
o Adequate pedestrian, loading/delivery, vehicle, and emergency vehicle access and circulation
shall be maintained.
Roadways and pedestrian walkways shall be kept clean and free of dirt and debris.
All construction deliveries, equipment, lools and materials entering the Vail Village and
Pedestrian areas must go through Check Point Charlie. All Lionshead construction activity
must go to the Vail Police Depariment for a parking permit. Do not use delivery zones for
construction parking; refer to approved staging plan or make other arrangements for parking.
The hours of Outside Construction Activity shall be as follows:
- April 15-June 17 & September 6- November 18,7 a.m. until 7 p.m., seven days a week.
June 17 thru September g, work must end by 4:00 p.m. on Fridays.
November 14 - April 15, 20OO work allowed within daylight hours only.
- Deiiveries shall be restricted to the hours of 7 a.m. to '1 1:30 a.m. on Gore Creek Drive and
7 a.m. to 8:30 a.m. on Bridge Street.
- Special Construction delivery permits must be requested in advance, from Public Works in
conjunction with Code Enforcement at Checkpoint Charlie.
- No construction activity shall occur on Saturday or Sunday between June 1B and
September 4.
I -' No outside construction activity shall occur on the foflowing dates:
Saturday, February 19, Sunday, February 20, and Monday, February 21 .
{President's Weekend)
. Saturday, May 28, Sunday, May 29 and Monday, May 30 (Memorial Dav)
Friday, July 1, Saturday, July 2 and Sunday, July 3 and Monday July 4
(lndependence Dav)
Friday, July 29, Saturday, July 30, and Sunday, July 31 (Antique Show)
Friday, August 19, Saturday, Augusi 20, and Sunday August 21 (Vail Arts Festival)
Saturday, September 3 Sunday, September 4, and Monday, September 5.
(Labor Dav Weekend).
Friday, September g, Saturday, September 10, Sunday, September 11 in (Lionshead)
Friday, September 16, Saturday, September 17 and Sunday, September 18, (Val
Villaqe) - (October Fest)
Thursday, November 24, (Thanksqivihq Dav) Friday, November 25, Saturday, November
26 and Sunday, November 27.
Saturday, December 24, Sunday, December 25, Monday, December 26
{Christmas Dav Hotidav)
Friday, December 30, Saturday, January 31.) Sunday January 1, 2006 (New Year 2006)
and Monday January 2, 2006. No Work allowed the entire week of the ChristmaslNew
Year Holiday within the TOV right of way.
. The Town of Vail Noise Ordinance has been waived by the Town Manager from 7a.m. -7p.m.for construction activities from April 15 through June 17, and from September 6 through
November 18. The Noise Ordinance shall be in effect and strictly regulated from June 20
through September 5 and November 14, 2005 io April 15, 2006
. All construction sites will be required to obtain an Aporoved Construciion-Staqinq Plan from
the Town of Vail Public Works Department in conjunction with Code Enforcement. (The. approved staging/parking plan is required to be on-site at all times).
. The Town of Vail reserves the right to amend the Vail Village and Lionshead Village
Construction Hours regulations at anytime should abuses or problems arise.
. The Three-Strike Rule will be enforced. Step 1. (Written warning), Step 2. (Written
warning), Step 3. (Construction site will be Red Tagged until all violations are resolved).
Expectations
The following expectations are established to insure the success of the Vail Village and Lionshead
Village Construction Hours Plan:
. Full and complete cooperation and understanding from all parties involved in the construction
activity in regards to this plan.
" Strict adherence and compliance with the requirements outlined in the construction plan.
" Respecl and consideralion for the affected interests and parties.
lf you have any questions, Please contact the Town of Vail Public Works Department
(Construction Inspector) or the Vaii Police Department (Code Enforcement Officer)
970-479-2198 970-476-7603
II
Vail 2004 Staging / Parking Plan Information
The Staqinq / Parkinq Plan Philosophv- ls a very importani step in the building process. Striking a balance
between safe public access and giving construciion projects room to build is becoming increasingly
challenging, for us to meet all the needs of those who will be impacted by construction projects. The fact is,
there is less room to build in the Town of Vail.
Developing a creative Staging Plan is a must. Staging in the Town of Vail Public Rightof Way is a Privilege, not
a given right. We take into accounl when we review and approve staging / parking plans, impacts on
neighborhoods, tourism, business and the traveling public along with your right to build.
TAI'iiN OTVAIL
Contract e for all subcontra and all co
building proiect. The staging plan will be enforced according to the Approved Set of Building and Stagi
Plans. You are required to keep a copy of the Approved Staging Plan on site.
Two staging /parking plans are required, a summer and winter. Summer staging plans expire on November 1
and winter staging plans expire on April 15. (Note: There is no on street parkinq in the winter season and a||
materials, equipment, etc must be 10' off the edoe of asphalt). l
Enforcement of all staging / parking plan is as follows.
A) Staging / Parking Plans to scale required.
B) Once the plan is approved, they will be held to complete compliance.
C) We will use a 3 step and you're out, process.
Step One- Verbal and written warnings as to the staging plan violation, then have contractor sign
field memo warning.
Step Two- Police Department issue tickets and tows or public works writes second written warning to all
violators who have been notified under step one and who are still in violation of the approved Staging i Parking
Plan. The Town of Vail Chief Building Official will call the contractor and notify them, the next time any violationl
k^^^^h^ +h^ h,,;l-l;-^ l^^^J---r.,-:rr -^r a-, rr-- ^^--a--.^r:^- ,.r,t L--.--- )happens, the building department will red tag the construction site for 48 hours.
Step Three- lf still in violation after step two, a 48 hour Red Tag will be issued to the proiect site.
lf you have any Questions, Please contact the Town of Vail Construction lnspector at 970-479-2198
lr nrl d aicr
F:\Users\JSuther\newBLOGPERM.DOC o1128t2004
tl
' Requirements for an Acceptable Staqinq Plan
tt is preferred that and Approved Site Plan is used to draw a staging plan, but a hand drawn plan may be used
as long as it is dawn to scale and is neat and legible.
1.) The Staging Plan must show the following:
a) Show all parking that is required for the job site. (lncluding construction equipment).
b) Show the location of all mater.ial that will be staged on site.
c) Show the location of all dumpsters and port-o-john that are to be on site.
d) lf a fence is required, then show the location of the fence and describe the material used for the fence.
e) lf trees and / or vegetation is required to be protected, then show how this will be done.
f) lf this staging plan is for a Demo Permit, then show staging for dump trucks and all related equipment. lf
the Town of Vail Right of Way area is needed for staging, then a Traffic Control Plan is required in
conjunction with the staging plan.
(g) Please provide and show an Erosion Control Plan.
(h) No equipment, vehicles, materials are allowed on Town of Vail Right of Way in the Winter Staging Plan.
2.) tf work needs to occur in the right of way, then add a Traffic ControlPlan to the staging plan showing the
following:
(a) The work zone (area that is to be performed)
(b) Traffic Control Devices (warning, signs, cones, flaggers, etc.)
(c) Distances that all devices will be set up from the work zone. Also show all dimensions of work being
performed in the right o'f way. All traffic control plans must conform to the MUTCD manual.(Manual of
Uniform Traffic Control Devices)
2.) This plan will be reviewed by Public Works and if Necessary the Police, Fire, and Community Development
Department. Once the staging plan is approved, it will be registered with the departments listed above and
enforced.
3.) The Village and Lionshead area have outside construction restrictions, please become
familiar with the Vail 2004, Vail Village and Lionshead Construction Hours handout.
F:\UsersUSuther\newBLOGPERM.DOC 07 /28/2004
.vlt'1u/turtD ll,; {+ tA,l Klo0Eluup
Tlnbcrfals Buildirg 20 unlr 2006 veil colorsdo
Thir mofidrntirl r:god k preprrrd cr.hdydy for Natt DsiE!! Eolrdl|ado!
tI
INCDECTI{)N
#L\JF-
m
ifiIltate
vt j Ia /;uvl ll: {+ tA.l Elu(rJ/00u
Tlmberhlls bulld;trg 20, urrlt 2006 Vail Colorado
This cotrlideraid rcport as prapsrnd cfthdvcl!. lor l,klt Du'tnr Coartrurtioo
Sample collection
fAe ful'Dwitrg stl.pl€s urcre col]eced i! rtc tblldrring nrcrs
1 . A bulk sauple of &.rwdl texrure, tlpe adl rud were rerrot'ed ftonr Ere dosca ird tJrc frodt bedroocr
2, .'! bulk mnple of *e cdliag u*tcriaL dry*nll asd mud wcle rcoocsd ft@ rhe ballrray
SmSrs wee medred rsrl double bcged nhipped ovemighr vir Fed Hx rzcling nurnbcr 841169?37934 to
EI,iSL A.aslFicd hbetory in l\4ilpirur California. ELISL has thc followiag nccreditatbas rod pmfuiracier,
;\$I.rI EI{LAP/THLAP,/ELLAP, AIHA E!tr}AT/IFJPAT,/ELPAT Is wcII as sII Fedflal GovEroficng Strta
end local ccrtiE{atcs rcquircd. All certi.6cetes rre od Elei coltrct EtrlSL fbt aore iaforantior,
EMSI" perfotmed aa EP-{ 600/R-91/ 115 aedrod rc$ rrrhg Polarizcd Ligbt Miworcopy tc detminc thr
esbestoc content of rhe rfotementioocd oate&ls.
II
@^=-*-
T]r'SEECTION
Ailtif,te
o7 /zEtzgu' lt:4ts t'AJ
lol gerrr *5ciil 4vtnyf, m p|td], CA as6f
thcnc:
Arnr P69.161 glgpt
Atler lrcpeclion Group, [lC
P,0. Bcr 3t3
Vril, @ Bl6El
FEs (i7O SiOTSEJ Ph!|g: (g7sl3Ec766r
FnieC: TinbdrltrtfiB
55rtb L4doi filFsrrt*
td 006/00s
Cus6i$ lD:
guBtoihat FlOl
Recdr€dj
E.{EL Oder:
EM6LP19:
A.4rEgit:
tlrytD*:
aTtl&t
O?EZEg E3O AM
trs€r8*
?f7rc
?t|'tffi
Aebestos Analyeie of Bslk ltlaFrials via EPA E00tTt-83lltE lUtthod urirrg Foladrsd
Ligrht Mlcruacopy
eAr!|rlsr
tr F|trlrE Xl| -FbrcuE
A6ba'rb6
* fypc
0or. qahg
aqilEetl{{dr
whts
Fbrwt
Hc|rEg5|teana
10!a cru€r.gg$ t{rn.t&r.,rd (Ch3r}on€ DctsctDrl
003e\ D$d
(a0fitt:JdE
TrWh[|
F[nE!5l{.tslFra€
&q( CC[lsre B0% 1{6fl-filrosr (C}Hrl lloF6 OrhslrC
00?-a orffill
ql'loT:as
clrr{Wnte
Nsr.FlbqF
Hofia€tt|fira
I Otr/. ltlfl .fl brs{r {*|ltl llone llrtsCad
EIilSL Analyfical, lnc
Arcysr{e)
ri1 "tr! i it /iJfrfi{(l
"t-.r-*"a*"-
Jclurl,ltatscr (.rl
b
{r,{sqC n.f r!{{E d{& l l..l&ttbt.lq, b.a.firrrrF.rrrr la! S.dd .lfffiL L$ni.El. hc. EFL|imi$lg{a. lD|lLiarl|\ dq Clil.r*|ldE fi
{ ll!'dor. Itra l! .rr tlal nfo.f $dr!dtbt!
ir lltd.Cb $.6*t'i.rdyri.. EIEL b.|'t ,t6 rliIllCrfi dlt*
'd.d r|1l $rt Fl bi
'tr C$EC t[ ] arrl\rtimrh.
ry l{ ijrgL rlldbt l|hlt . sf rdr{dln|*llrc
THIS Ig THE I"AST PAtrE OF THE REPIORT,
u9 svd ]vsrlA-k|.|? -'lst{3
E IEITEESA'
.oitz5/l|Ju6 t1:ilo tAJ tsl(l(r7 /(J0s
Tinhcriblls buikling 20, uit 2006 Vall Colorado
Tlb coddrnfu rtp$t h Frc?rlcal .rchCv.ly Sor Ndt DtdBtr$ Co.Btrlctior
Inspectors Recommendations
No arbcsto; wu detectcd ia ttc saoplcl collccted. Therdore it ir recoooeodcd drt &ere is nc reeil for
aSeetou reoediatior cad or rcoDvd,
€t^r*^'.
II
TOWN OF VAIL
75 S.FRONTAGEROAD
VAIL. CO 81657
970-479-2138
Job Address: 4504 TIMBER FALIS CT VAIL
Location.....: TIMBERFALLS # 2006
Parcel No...: 2l0ll23l2ffi6
Project No : ? \lfOS'6 sl.
^otttNER cAREy, MICHAEL ir. & wENDy M.oe/$/2oos
6817 EI,AINE WAY
SAN DIEGO
cA 92L20
DEPARTMENT OF COMMUNITY DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ELECTRICAL PERMIT Permit #: EO5-0177
i3oe *6L05-
ISSUED
08/18/2005
09tot/200.5
ozt28t2N6
APPI-,TCA]iTT AVAIJANCIfE ELECTRIC CORP
PO BOX 27L5
DIIJIJON
coIJoRADO 80435
License:188-E
CONTRACTOR AVAIJANCHE ELECTRTC CORP
PO BOX 2715
DILIJON
. coIJoRADO 80435
Lricense:188-E
oe/18/2oos Phone:970-468-0249
08/l-el2005 Phone.: 9?a-468-Q249
Desciption: REROUTE ELECTRICAL IN MASTER BATH WALL AND KITCHEN WALL.
INSTALL NEW CAN LIGHTING IN CONDO. INSTALL PHONE AND CABLE
TV. NEW OUTLETS AND SWITCHES. RUN WIRE FOR WHIRLPOOL TUB.
Valuation: $6.000.00 Square feet:1300
Electrical------ >
DRB Fe€------- >
Investigation-- >
Will Call------- >
08/23/2O0s STTAHN
Item: 05500 FIRE DEPARTIIENr
$57. s0
$0.00
$0-00
$3.00
$60 . s0
$o. oo
$50 . s0
$60 . so
Total Calculated Fe€s- >
Additional Fe€s----- >
Total Permit Fee-*-*-- >
Payments--
TOTAL FEES- > $60. s0 BALANCE DUE-------> $0.00
Approvals:
Item: 05000 EJECTRICAIJ DEPARTMENT
Action: AP
CONDITIONS OF APPROVAL
Cond: 12
-!?.o.P..n;J.;..1T*l*.IT:.t,.T,.9I.I.91H..**.5IPJ.t.*11-.t*.f.tl"*:*-J-?*.S-o3.T.f.?yJ-1I*Sf*t*********'.i*******,*:r*,.***i!*****'.
DECLARATIONS
I hereby acknowledge that I have read this apptication, filled out in full the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the inforrnation and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design
review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
FRON :NETT ESIGNS Cq.']STRUCT]I]N
tu[?Y0F
FHX NO. :9744?6551
COilTRACTOR IN FOR]IATION
or Yisit
ff1r9. 1E 2ffi5 IEiB?PH PZ
APFLICATION WILL T{OT BE ACCEPTED IF I]|COMPLETE OR
75 ti. Frontaga ltI,O
Vaif, ColoraEofrJsiSl
coFtPrETE SQ. FEET
-63LL
Building Permit #;
Electrical permit #:I
FOR ALL oTHERS (tahor & tlstedalr)
.\e-\/ |
*t,********-*2.)7il|.7-*V.|}d*.*-****+++*FOR OFFXCE USE ONLY**********n*,r******r**+****+*********
viu"04'
E lectrical Cnntractorl Contact and Phone #3:
2o-dbt -d-
A.MOUNT OF SQ FT IN VALUATIoN: i 6. OAA
Farcel # Ll O// ZS t
:ob Addr#,Y{7F Tnea* tr*us (r r/t+ tt-JobName: (*ns"r Pnro*roo
E.--z 6a6Trz t4t*t-- ,nl ttlsta-A F,w ^tlr|Zt t- f ':t(ft6'-J.u'lfi'c--' ir*r*r. ity; &N Ttitiita rrt ei,,',5.o. frstzt+ /l'to*o *(44t*zt't
ty'ful du!fi./s-a's, +- S r.., tT q Fffs j 2-"t Ul, *- ftE- ur+t4r. fe t 7-t'0..
Work0ass: New( ) Addition( ) Remodel (p/ nepair( ) TernpFqv,,er( ) Other( )
Does an EHU exist at this locauon: Yes( ) NaWork Ty?er rnterior 64 Exterior ( ) aoth ( )
Type ofBldg.: Singte-famiv ( ) DuPlex ( ) Multi-fatnity ( l,.f comrnercial ( ) Restaurant ( ) Other ( )
No. of Acmrrrmodation Unis in this building;No. of ftisting Dwelling Units In this building:
ffi;Tfrespdniler System Exist: Yes ( ) NoDoes a Fire Alarm Exjst: Yes ([,,{ No ( )
\wEiMddcd€-v\FORMS,.!'EP&f ITSTELECPEI$I-OOC RECD AUG 77 NW Lc.-
TOWN OF VAIL DEPARTMENT OF COMMUNITY DEVELOPMENT
75 S. FRONTAGEROAD
VAIL. CO 81657
n0479-2138
NOTE: THIS PERMIT MUST BE POSTED ON IOBSITE AT ALL TIMES
PLLIMBING PERMIT Permit #: P05-0113
3os -c zo5:
Job Address: 4504 TIMBER FALLS CT VAIL Status . . . : ISSUED
[.ocation.....: TIMBERFALLS#2006 Applied..: O8tt6t2Cfi5
Parcel No...: 2l0ll23l2ffi Issued. . : O8ll7l2Cfl5
Project No : j115- oS -65A2_ Expires . .: 02ll3l20fr6
oI{NER CAREY, MTCHAEIT iI. & WEIiIDY M.O8/u6/2O05
5817 ELAINE WAY
SAI{I DIEGO
cA 92L20
APPLICANI PIJITMBING SYSTEMS, INC. 0B/L6/2005 phonet 970-39O-7763
PO BOX 3879/LO6A WILDWOOD, UNrrz
AVON
co 8L620
Iricerrse | 277 -P
CONTRACTOR PLUMBING SYSTEMS, INC. |B/L6/20O5 phone: 970-390-7753
PO BOX 3879/1068 WTT,DWOOD, ITNIT2
AVON
co 81620
Lricense:277-P
Desciption: MOVE WASTE LINE FOR TOILET AND TLJB IN MASTBRBATH, REOWRK
WATER LINES. INSTALL NEW VANITY AND SHOWER FIXTURE-S IN 2
GUEST BATHS
Valuation: $8,000.00
Fireplacc lnfomation: Resricted: ?? # of Gas Appliances: ?? #ofGasLogs: 2? #of Wood Pallet: ??
:il::ilil1il:il::il:ilil:ilff llllHH:::lllllH:-***++ FEE suMMARy
Ptumbing- > $120.00 Resurrant Plan Review-> 90.00 Total Calculatcd Fees--> $153.00
Plsn Check-> $30.00 DRB Fee-----------------> So.oo Additional Fees-----> S0.00
InvestigEtioF > So. oo TOTAL FEES---> S153 , OO Total Permit Fee-----> $153 . 00wi[ca[---> s3'00 iffim;;uE.:--:---] ttil:88
**+tt*+i++t *{.ltr***
Item: 051O0 BUTIJDING DEPARII{ENT
o8/L6/20os ,Js Action: AP
ITeM: O55OO FIRE DEPARII.TENT
CONDITION OF APPROVAL
Cond: 12
-l?lff;k'J-.tTl?....1T.t-t=-*!I1-o-*"*'ffi-.T-1P:Im-..t.'?-"9-H:.1--T9*--"".o"?.T..-"9-yf-1I*HlI;..--***r**d(*,.**,*'r****+'|***i,.*:*
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in futl tln information required, completed an nccurate plot
plan, and state that all the infonnation as required is correct. I agree to comply with the information and plot plan, to comply
witft al Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design
review approved, International Building and Residential Codes and other ordinances of the Town applicable ther,eto.
++++{.*****************ft**'t'}*****+*'}****t*{.*+*+t+**************,}****+*,t++++{.++*r**,*,t*:r******
TOWNOFVAIL, COLORADO Statsnenr++++**t**t{.**++'}++++****i.***{r******a+++*f***r'}f********++fff*t**,f**{.***********+*******+****
Statetnent Number: R050001320 Anount:
Palment Method: C'lxeck
Systems, I,nc. / ck283 0
$153. 00 Oe /!7 /zooso2:42 PMInit: LT
Noeauion r Pluribtng
Permit llo:
Parsel No:
Site Address:
LOCation:
Tbis Payment:
ACCOUNT ITEM LIST:
Account Code
00100003112300
0010 0 0 03111100
00100003112800
P05-0113 TYPE: PIJUMBING PERI'IT
$1s3. oo
**'+'l'lf'l*l'*'*******++++***'l**+**{.********++++++**'}*f****{.*************************************
2101-123 - 1200- 6
4504 TIMBER FALLS CT VAIIJ
TIMBERFAIJIJS # 2006
DeEcription
Total Feee:
Totsa1 AIrL Pnta:
Balance:
$1s3 .00
$1s3 .00
$0.00
Current Prnts
PF
PP
wc
PIAIiI CHECK EEES
PIJI,MBING PERMIT FEES
}IIIJIJ CAI.,I., INSPECTION FEE
30.00
120.00
3 .00
a&u$lrs For' nlsPEcrloN slrAl,L 8E MADE TwBNTY-FoLIR HouRs IN ADVANCB Ey rEtEpIIo!{E AT 47921,t9 oB AT ouR oFFICE F*oM 8:fi}AM - 4ru.
I
FROM :NETT leSrOr.ts C0NSTRUCTI0N
mwnilFwn
75 S. Frontage Rd.
Vail, Colorado 81687
FAX N0. t97A4?655=L Au9. 1@ 2A@5 tA,AZPn P?
APPLICAIION WT[t TIOT BE ACCEPTED IF INCOHPLETE OR UNSI
Project #r 7z.-z
3i[1?TglTH,i,f;#G
FORMA
COMPTETE VALUATION FOR PLUMBING PERMIT (Labor & Ftateriats)
PLUMBING: g 8" Oo O
As&sfirs at9 #
Parcel #2td // 23t ZpgG
rob Name: Cr+p* 2s sto€-aes rob Acfdressr tt/ 7 7 Ta*szz &t s Cr tAz
Legal Description Lot:Bloclc:Filing:Subdivision:
WfFIW'runor (*a..,^Wd v { !*n, --*-t .- P*r* *i}c[one: 6 1 ?'979 - 7a / 4Engineer: /Vrf Address;Phone:
Qetaifed description of work: y'fu/s- tttlsr
llsuloa,e,,.VFTAn-Lty'gS t .a>zTtt- tl,lezt Utta r7T v S do./sft Ft vl-uat-s, ttJ 1-ate @sfI/ft-r-6,
Work Class: New ( )Arldition ( )
,/
Alteration (/ Repair ( ) Other ( )
TypeofBfdg.: Slngh-ramily( ) Dupler( ) Mutti-famitygrf commerctat ( ) Restaurant( )other( )
No, of Existing Dwelling Units in this building: 6 No. of Accomma'dation Units in this buildinq:
Is this a conversion from a wood burning fireplace to an EF.A Phase II deviceT VEI I tto gz1-
******************************r.********FoR oFFICE USE ONLY**-****+***********rr*****,4'****+*++*n++
! .'- J' = :.-] *.r
f"r.'"it I: tJ .'*,1)
i
I
.,i Ii-,i,.; I '
I
i
I' .1.'-L i;fl4.nEv. i
Inspecffon Request R
Reguested lnspect Date: IrtCay, Septernber 02, 2005- Insge:'dor'rr:i: -if.;;*;R FALLS:r vArL
TIMEERFALLS #2006
A,IF,D lntormauon
Acllvlty: E(F0177 Tw,a: &ELEC SubTvoe: AMF Status: ISSUEDConstTyp6: 9Sg,l;1a.!ity, (lse: Insptue.: SH
Or'ner: CAREY. llllCl-l,AEl J. & VI/ENDY $it. ..rT
Applkant AVAI-ANCI-E ELECTRIC CORP Phor,e: 97S46$024E1
Co'dbactof: AVAIIrcHE ELECTRIC CORF Phons: 97O4&0249Oescridbn: REROUTE ELECTRICAL lN ITIASTER BATII WALL AND KITCHEN WALL. INSTALL NEWCAN Llcffni|Giil c-htDo. |NSTALL Phtcli{E AND CA6LE iJ. NEW OUTLETS AID SyIATCHES, RUN |URE FORriw,RLPoo(TUB' i> ^ t^ +P lLa E-rL
Reouestedrnspecdon(sr /<o " ?n /y l-_:
Requested Tlme: 01:00 PM- Phone: 970€g),69lit
Entared By: LCAMPBELL K
\"**t"'* X:oo f no-rr S; I &,//"1,J
1/ -/o s
Lrc- 3ro - GSYS
-- 0 aot),a^6 st' -'L<4 F.rtoLh^'lP lba"!azz'"t
G?f, int tlrg /rt-or'rt a FtP"ra- /'''4/
lnsE€cuon Hlsloft
Item: 110 ELEC-Temo. Powar
l!em: 120 ELEC-RoughItrm: 13t) ELEC-Corxlult
tlem: 14O ELEC-Mbc.tbm: 190 ELEC.FInaI
REPT131 Run Id: 3576
11-17-2m5 Inspction Reguest Reporting Page49
5:21 pm Vatt, co'- Clty Oi -
Requestsd lnspect Date: Frlday, llcvember t8,2005' Inspection Area: 9H
S;te AJdre:s: 45;,.t TIMBER FALLS CT VAIL
TltfgERFALrS #20C6
A,'P/D lnformaton
Acth/ftv:
"o*s/"11:Applhanl:
Cohbaclor:
Descrlption:
E05-0177 - Type: B.ELEC
cAREY.ur+rner-1.ffiffi5'y'i,,l. -Jr
AVAI,"ANCHE ELECTRIC CORP
Strts: ISSuED
IrEpArea: SH
Pfione: 97S46&0d4E)
AVAI-AI{CHE ELECTRIC CORP Phone: 970,46&0249
REROTJTE ELECTRICAL lN liiLAsTER BATH WALL AND KITCHEN WALL, ll,lSTALL NEWCAT{ LlGHntG
IN COT{DO. INSTALL PTKINE AND CABLE n/. NEW OI'TLETS AND SWTCI-ES. Rt'}I UIRE FOR
VI/TIIRLPOOLruB.
Reouested lnspecfl on(s I
Item: 190 ELEC.Flnat
Requ€stor: AVALANCHE ELECTRIC CCRP .'TEDlllTl-l
i'IETT DESIGI'IS
Ccrnmenk: l,tlll CALL; UNITi00G
Asslon€d To: SFli{HN
*##"* NEEtrDTsENNEcT FoIfraFt,$irtRTEtrrER.
Requested Tlme: 10100 AM- Phone: 39o.6541
Ent€red B!,: LCAII/FBELL K
lnso€cfon HlstorY
F,ur{L ,+rf Lovs
sfwt il*///
rrft ulo{
ELEC-Temp. Power
ELEC-Rouqh
09'02,'05 Insp€clor: shahn Action: APCR APPROVED,CORREC]]ON REOD
Com'n€nl; PROVIDE STRIKE PROTECTION IN BEDROOMS.
PROVTDE GR tN RESTnOOMS @ R|AL TNSPECTION.
ELE+Condun
ELEC-Mkr.
ELEC-Rnsl
11/17,05 Inspector: SHAHN Acllcn: CRCORRECTIONREAU|RED
ComnTent NEED DISCONNECT FCR HOTWATER HEATER.
Item: 1{0
It€m: 12O
[em: 130
!l€m: 140
Item: 1S
REPT131 Run Id: 3905