Loading...
HomeMy WebLinkAboutTIMBER FALLS CONDOMINIUMS UNIT 301 PART 3 LEGAL(5,$orn (\trvt q Ttrnkrcrta\\s I Unik 3ol "ii "t i:.Fff,""Fi Projecl Application Proiecl Name: - Project Description: Contact Person and Phone Owner, Address and Phone: Architect, Addregs and Phone: Legal Description: Lot Filing Zon6 - Comments; Design Review Board Date DISAPPROVAL E "sratt Approval ,l APPLICATION DATE OF DRB 4/16/90 May 2,1990 DRB APPLICATION *****THIS APPLICATION VJILL NOT BE ACCEPTED UNTIL ALL INFORMATION IS SUBI4ITTED***** I. PRE-APPLICATION MEETING: A pre-app'lication meeting with a planning staff member is strongly suggested to determine if any additional information is needed. No application will be accepted unless lt is complete (must include a'll items required by the zoning administrator).It is the applicant's responsibility to make an appo'intrnent with the staff to find out about additional submittal requirements. Please note that a C0MPLETE applica-tion will streamline the approval process for your project by decreasing the numberof conditions of approval that the DRB may st'ipulate. ALL conditions of approval must be resolved before a bu'ilding permit is issued. A. PROJECT DESCRIPTI0N: Enclose req.r deck to accommodate a Hot tub and a WhirlPool tvne tub B. LOCATION OF PROPOSAL: Address 4500 East Meadow Drive Vail. Colorado Unit 301 Timber Falls Condo Phase One Legal Description Lo!Bl ock Fi'l 'i ng Zoninq Low density Multi-family NAME OF APPLICANT: Roqer Azcarraqa AddressPrivada De Horacia #10 Colonia polanco Mexico D.F. telephonegO5-S+0-2040 NAME OF APPLICANT'S REPRESENTATIVE: Bob RudeT Address 4496 East Meadow Drive Vail. Colo telephone4zo-zszz E. NAME OF OI.INERS: NG: DATE: MEETI c. D. Si gnature Address same as above tel ephone F. DRB FEE: The fee will be pa'id at the time a building pennit is requested. VALUATION FEE $ 0-$ 10,000 $10,001 -$ 50,000 $50,001 -$ 150,000 $150,001 - $ 500,000 $500,001 - $1,000,000$ Over $1,000,000 $ 10.00 $ 2s.00 $ 50.00 $100.00 $200.00 $300.00 IMPORTANT NOTICE REGARDING ALL SUBMISSIONS TO THE DRB: 1. In addition to meeting submjttal requirements, the applicant must stake the site to indicate property lines and building corners. Trees that wil'l be removed should also be marked. This work must be completed before the DRB visits the si te. 2. The review process for NEl,l BUILDINGS will normally involve two separate meetings of the Design Review Board, so plan on at least two meetings for their approval' 3. People who fail to appear before the Design Review Board at their scheduled meeting and who have not asked for a postponement will be reguired to be republ i shed. o 4. The following items no longer have to be presented-to.the Design_Review Board- They, howevei, have to be [resented to the Zoning Administrator for approval: a. |l|indows, skylights and similar exterior changes that do not alter the existing plane of the building; and b. Building additions that are not viewed lfory lny other'lot or public spaceo wh'ich hive had letters submitted from adioining property owners approving the addition; and/or approval from the agent for, or manager of a condominium association. 5. You may be required to conduct Natural Hazard Studies on your property, You shou'l d check with a Town Planner before proceeding. DATE: 4/16/90_ LEGAL DESCR-TFTIdfrIEI- ZONE CHECK FOR SFR, R, R P/S ZONE DISTRICTS B'lock Filing oger Azcarraqa ARCH I TECT--TouF-Seaion s-Gieenhou se ZONE DISTRICT LDMF LoT SIZE Tj Al I owed ( 30) (33) rnone Phone Proposed Hei ght Total GRFA Primary GRFA Secondary GRFA Setbacks: Front Sides Rear llater Course Site Coverage Landscapi ng Fence/ Reta i ni ng Wa1 1 Parki ng Credits: Garage 20' 1El 15' (30)(so) He i ghts Mechan i ca l Ai rl ock Storage So'lar Heat Drive: Slope Permitted Envi ronmenta'l /Hazards : (3oo)(600) (eoo)(1200) (50) (100) (25) (50) (2oo)(4oo) S'lope Actual Ava I anche Flood P'lain Sl ope lletl ands Geologic Hazards Corrnents: The greenhouse is a vertical face only on an pxisting deck that is limited common to the unit. Zoni ng: Approved/Dl sapproved Date: StafT Signature NAME OF PROJECT: LEGAL DESCRIPTION: STREET AODRESS: DESCRIPTION OF PR The following information is required for submittal Board before a fina'l approval can be fiven: A. BUILDING I'IATERIALS: TYPE OF MATERIAL by the appllcant to the Design Review COLOR I LIST OF MATERIALS O Roof Si di ng Other lJalI Materials Fasci a Soffits lrli ndows llindow Trim Doors Door Trim Hand or Deck Rails Fl ues anadized - Fl ash i ngs Ch'imneys B. Trash Enclosures Greenhouses 0ther LANDSCAPING: Name PLANT MTERIALS: PROPOSED TREES Forrr Sea sonc of Designer: phone: Botanical Name EXISTING TREES TO BE REMOVED Comnon Nane Quani ty Si ze* Indicate height for conifers. (over) *Indicate caliper for deciducious trees. PLANT IIIATERIALS: (con't) SHRUBS EXISTiNG SHRUBS TO BE REMOVED GROUND COVERS SEED Botanical Name Type Cornmon Name Size s0D TYPE OF IRRIGATION TYPE OR METHOD OF EROSION CONTROL 0THER'LANDSCAPE FEATURES (retaining walls, fences, swimming pools, etc.) p'lease spec .............--. c.fy. -rf- r ---II I -:-t coHDoiilNruf,i As$octATtoH (303) 47F2522 4406 EA8T IIEADOW DRIVE . VA|L GOLO. s1657 8ey Tlnber Falls 301 Deek Greenhouse; Tona of 'ttail D*p*rtnent ef CoununityTalL, Colsrado 81165? Dcar,Planncrsi Developnent ?be Tiuber Falls Condonlnlun Assoclafion haa net *1th Mn.Azcamaga, th€ elrn€r of unlt 30 1 and hEg revlEurd bls rsqu.aat'..5oi . .'.,. enclos€ a gart of t,he deek t,hat ls liulted eortoR to bls'unlt'*n6, .".,, on the $orth elde of tbe buildlng. Thc sun nevap ghtn€E sa blbda.ck ead ne thiak hls plan is a good ugE of the dsck aafi sould snhanee not only bis unlt but, bhe eonplex. Ic aa* bhei you glve Hr'. Azcarraga bhe approval to Edd !h*;ffi"-.,to'the torth edga of his deek so he can edd a hot tub. ', Thlnk you for your aLLantton ln thls aEtten, aud pleeas oell -y-ou have Eny quostione on nead additlonal lnfomailon. "".ffi'p#: ttubgn Falls llangagencnb Co. IncFr*penty llenagere fEr Tinber Fa}ls Condeninlun, Aegoeletlon Phase l