HomeMy WebLinkAboutVAIL VILLAGE FILING 2 LOT G FIRST BANK OF VAIL UNIT 5 LEGALVa.\ ui(t a1e Gtiltq
Cir$ $ant o$ vail
t lnit b
T0r,fir
Project Name:
Project Description:
Pa rticipa nts:
Project Address: 17 VAIL RD VAIL
Legal Description: Lot: G Block: Subdivision: B.S. CONDO
Parcel Number: 210107107006
Comments:
Design Review Board
ACTION FORM
Departrnent of Community Development
75 South Frontage Road. Vail, Colorado 81657
tel: 970.479.2139 fax: 970.479.2452
web: www.ci.vail.co.us
DRB Number: DR8030115
Location: 17 Vail Road
lst Bank
Window replacement
OWNER FIRST BANK OF VAIL O4/1712003 Phone:
C/O FIRSTBANK HOLDING CO
PO BOX 150097
LAKEWOOD CO 80215
License:
APPLICANT Golden Triangle Construction04 I t7 12003 Phone: 303-772-4051
Joe Vasbinder
700 Weaver Park Road
Longmont, CO
Jvasbinder@gtci.net 80501
Ltcense:
r l/llll
Motion By:
Second By:
Vote:
Conditions:
BOARD/STAFF ACTION
Action: SfAFFAPR
Date of Approval: 0510712003
Cond: B
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: CON0005831
The window cladding shall be a gray color to match the existing windows.
Planner: Bill Gibson DRB Fee Paid: $0.00
o
TOI,|IN
Zoning:tv+4tO t A
Name(s) of Owner(s):
Mailing Addressr
Owner(s) Signature(s):
Name of Applicant:
Mailing Address:
E-mail Address:
Type of Review and Fee:
n Signs
E Conceptual Review
n New Constructiontr Addition
tr Minor Alteration
(multi-family/commercial)
tr Minor Alteration
(single-family/duPlex)
fl Changes to Approved Plans
tr Separation Request
'lZt^n /;GLt 2u,>
Phone:
t9+
AI
$50 Plus $1.00 p€r square foot of total sign area'
No Fee
$650 For construction of a new building or demo/rebuild'
i:OO For an addition where square footage is added to any residential or
commerciaIbuilding(inc|udes250additions&interiorconversions).
$250 For minor changes to buildings and site improvements' sucn as'
reroofing, painting, window additions, landscaping' fences and
retaininq walls, etc.
$20 For min6r changes to buildings and site improvements' such as'
reroofing, painting, windoir additions, landscaping' fences and
retaining walls, etc.
$20 Foi revisions to plans already approved by Planning Staff or the
Design Review Board.
No Fee
r i/,{it
Application for Design Review
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2t39 f aK 970'479.2452
web: www.ci.vail.co,us
General InformaUon:
All projects requiring design review must receive approval prior to submitting a building permit application' Please
refer to the submittal requirements for the particular approval that is requested. An application for Design Review
cannot be accepted untii all required information is received by the Community Development Department' The
project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission.
beiign review approval lapses unle*s a building pemit is issued and construction commences within
one year of the approval. _-1 , / . \
Descriptionof theRequest S4WA fu $wa ll/rpAow FV/a"a-"f (EWZlaA)
Location of the proposaf: Lot:-Blockr- suhtirition, (AloDo B9 U"' tr bb
physicalAddress: t7 Veil lbe> Ve'|, h ' 8rcs7
Parcel No.:LlelOl183 e9_b__(Contact Eagle Co, Assessor at 970-328-8540 for parcel no')
trL
[/o'8l6s+
- 33oo
z\ 714-:GEZE
Sent By: HP LaserJet 31 00;303776e689;Apr-2t3 7:48AM; Page 1
FAX
TO: Bill Gibson Fax# 970.479.2452
Town of Vail - Dept. of Community Development
FROM: Joe Vasbinder
Golden Triangle Construction, Inc.
DATE: April24,2W3
RE: 1$ Bank Vail Remodel - Replacement Windows
Number o.f'pages including this eover -tr- lf all sheeff are not received, plea're call'
Bill,
please see the attachcd cut-shects for a typical rcplacement exterior winclow for thc l$ Bank of
Vail Remodel project.
Please retbr to spes secrion 8550 * Aluminum Clad Windows and Sheet A1'9 for the Window
Schedule for rnore information,
Please feel frpe to call with any questions or somrnents'
Thanks.
Joe Vasbinder
Goldcn Trianglc Construction
('olden T ria n gI e C oa s Eu c tion, I n c -
700 Weavcr Park Rod, Swite E
Longmont,Co 60501
(303) 772-4051
(lQi) 776-6s25lar
Sent By: HP LasenJet 31 00;
#F23'2@3 t4:51
3037769689;
U.FIEER
Aen'Us JiJ'# ru*
Page 213
P.WA3
Marvin Windowc & Dooru' MD$ Vprsion 15'2, MDS RB Trbe Vcrsiotl 15.3, MDs RB Codc Version 15'3
Scrle: l/2' - I'
Call Neme: oPOLY'CUSTOM
R.O.:73'r 36 ttz-
M,O.:72 L/2'x36 Lt4'
Pfolact Name: flrst bFnk, Vlil
Comriienk Clecl Direct Glaze 1' 16
Ssnt By: HF LaEenJ€t 31 00;
FPF-a3-2483 14:51
|l 303776s68s;
tr.FINETAN LLMBER
Aer'U3 lii# *,,Page 3/3
P.re/63
Marvjn Windowr & Doors. Mp$ Verslon f 5'2' MOS RB Tabs Vcrsion 15.3, M95 FB Code {s55iP6 153
1%"
E tr.ratua+>,*trrat,a*gOa1*4
t z l tl
tTrw
fuat+Etho e* rt
^tSl{yput- tM#l* t-6otr qr -harE-E E4
4a rrrurt€ ',fufrtshH
- ft*ta rwat 6e4",
,/' I gntta ur+rE
I L tk*{#(r.t+ E*aruat
\ | Hqt..fui.o4ft\> i _ eatw4ne.J-( d fu*s4*p,
\_
Typ. A
*b*-,l\
I +i*-)
crll Naf 6: CPOLY'CUSTOM
P;otsct Nrme: First bank. vail
Co,riileni: ryPtctl Head/JEmb/gill
^Scrc
Joe Valblnder
9g*EX"r#H?f s%*"ucT|oN,rr{c.
LOaTGUONI CO 805ot
E{ tL; jrrdtn&rogac1 .r.lwlr.gtcl.r_l
PlloNE (3G) Z/2-t(E1
FA:X (3Gt Z/6€525
MOETLE (72O) 32&A79