Loading...
HomeMy WebLinkAboutLIONS RIDGE FILING 2 LOT 4 LEGALFromr Sent: To: Subject: Attachments: Bill Gibson Tuesday, September 27, 20LL L:44 PM 'McCutcheon, Darwin' RE: 1415 Lions Ridge Loop, Lot 4 Filing 2 20]-1.0927 L3322 s9 s 5. p df Hey Darwin, The existing garage was constructed prior to 1972 (see attached land survey) under Eagle County jurisdiction. The subject property was annexed into the Town of Vail on August 15, 1979 through Ordinance No. 29, Series of 1979. The existing garage is therefore legally non-conforming and may continue subject to the provisions of Chapter 12-L8, Nonconforming Sites, Uses, Structures, and Site lmprovements, Vail Town Code. Sincerely, Bitl BillGibson, AICP Town Planner Community Development T0nt 0F t/Af 970.479.2173 970.479-2452 fax vailgov.com twitter.comivailgov cri]ivff,ll&rr'r l From : McCutcheon, Dan rin [maiho:darwin@fsir.biz] Sent Tuesday, September 27,2:OLI 12:01 PM To: Bill Gibson SubJec$ 1415 Lions Ridge Loop, Lot 4 Filing 2 Hi Bill, I hope all is well for you today. Sir, as per my voice mail, the architectural report suggested there is a current set back violation a couple other minor violations that have been OK (to date) on this property (1415 Lions Ridge Loop, Lot 4 Filing 2) but we would like to see about getting a letter which effectively grandfathers those issues so he doesn't get a tap on the shoulder telling him that he needs to tear down his garage and move it back to conform with today's official set back regulations. l Sir, are you the right person ro ,otr,rt* or is there somebody else that , ,rtio be tatking to so we can obtain a letter like this? How long does it normally take to receive a letter like this? Bill, I need to know that time period since I will have to try and obtain an amend extend on the due diligence period for the purchase conkact. Thank you for you time and we would appreciate a quick response if possible. Best regards, Darwin Darwin T, McCutcheon Forbes Sotheby's Intemational Realty dmwin@fsir.biz 970-845-0400 OfIice 970-748-5102Direct 970-306-7102 Mobile fiJl L"+ vrsku,L;"eftJa €1,1L AlpRBn H. axo Susau Wl-r-rRus POBox 18420 AvoN, CO 81620 November 17,2006 Iown of Voil Design Review Boord Deportmenf of Community Development 75 South Frontoge Rood Voil. CO 81557 ATTENTION: WARREN CAMPBELL RE: Alfred H & Suson Willioms l40l Lions Ridge Loop, Voil DRB Number: DR8060384 ond DRB060268 Good Morning, Regording the obove listed DRB reference numbers wherein removol ond replonting of certoin lrees wos colled for by lhe Design Review Boord on the subject property, it is respectfully requesled lhol on extension of lime be gronted lo replont ihe trees on the property during the plonting seoson by Moy 31 ,2OO7. Enclosed herein you will find o copy of the DRB Action forms for your perusol. lt is believed thot ot this point, oltempting lo plont replocemenl trees would not be beneficiol lo the trees os they would probobly nof be oble to survive ihe tronsplont, esfoblished themselves ond endure the winter conditions. Thonking you for your considerotion, I om Rnry,'(.$]f eo'$, Enc.: DRB Aclion Forms ocen*$$Y EvEloPt{l,fi Design Review ACTION FOR}I Department of Cornmunity Oevelopment 75 South Frontage Road, Vail, Colorado 81657 tel:970.479.2!.39 fax:970.479.2452 web: www,vai[g{rr.com o Boad Project Namer MLLIAMS RES. CHANGE Prciect Descripuon: Participants: DRB Number: DRB060384 Application to remove one aspen, modifry the existing deck, replace a window and repalce stone with siding. owNER MLLIAMS, ALFRED H. & SUZAN 0812212006 PO BOX 18420 AVON co 81620 ARCHITECT VICTOR MARK DONALDSON ARCHIT0S | 2Zl 2006 Phone: 970-949-5200 OO48 BEAVER CREEK BLVD, STE 207 PO BOX 5300 AVON co 81620 License: C000002070 APPUCANT VICTORMARK DONALDSON ARCHITE0S/222006 Phone: 949-5200 ProjectAddress: 1401 LIONS RIDGE LP VAIL 1401 UONSRIDGE LOOP Location: Legal Description: Lot 4 Block: 3 Subdivision: LION'S RIDGE FIL. 2 Parcel Number: 2103-122-0200-6 Commentsr SeeConditions Motion By: Second Byr Vote3 Conditionsr BOARD/STAFF ACTION Action: STAFFAPR Date of Approval: 09/06/2006 Cond: I (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond:0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 DRB approval shall not become valid for 20 days following the date of approval. Cond: 202 Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced anO is oitigilty pursued toward compleuon. Cond: CON0008391 Ttrc applicant shall repace all removed aspens with an equal number of new aspens on the site which have a minimum caliper of 2.5 inches, prior to May 31, 2007. Warren Campbell DRB Fee Paid: S20.00 OCI'lfir{TY IE\,ELOP|,€X' o Design Revierv Board ACTIOI{ FORM Department of community Development 75 Sorth F ontage Road, Vail, Colorado 81657 tel: 970.479.2139 tax: 97o.479.2452 web: www.vailgov.com Application to remove one aspen, modifiy the existing deck, replace a window and repalce stone with siding. Participants: owNER WTLUAMS, ALFRED H. & SUZAN 0812212006 PO BOX 18420 AVON co 81620 ARCHITECT VTCTOR MARK DONALDSON ARCHIT0s/2212006 OO48 BEAVER CREEK BLVD, sIE2O7 .PO BOX 5300 AVON co 81620 License: C000002070 APPUCANT VICTORMARK DONALDSON ARCHffi0B/22I2006 Phone: 949-5200 PrcjectAddress: 1401 LIONS RIDGE LP VAIL 1401 LIONSRIDGE LOOP Location: ProjectName: WILUAMS RES. CHANGE Project Description: Legal Description: Parcel l{umber: Comments: Motion By: Second By: Vote: Conditions: DRB Number: DRB060384 Phone: 970-949-5200 loh 4 Blod(:KsuMivision: UON'S RIDGE FIL.2 I 2103-122-0200-6 See Conditions BOARD/STAFF ACTION Action: STAFFAPR Date of Approval: 09/05/2006 @nd:8 (P|-AN): No changes to these plans may be made without the written @nsent of Town of Vail staff and/or the appropriate review committee(s). Cond: 0 (Pl,AN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. @nd:201 DRB approval shall not become valid for 20 days folloMng the date of approval. Cond: 202 Approval of this project shall lapse and become void one (1) year following the date of flnal approval, unless a building permit is issued and construction is commenced t Department of Community Development 75 South Frontage Road, Vail, Colorado 81657 tel: 970.479.2128 fax't 970.479.2452 web: www,vailgov.com parcef No.! 2l ozl?;2.ol- oot (contact Eagle co. Assessor at 970-3zg-g6,f0 for parcel no.) Zoning: Name(s) of Owner(s): Owner(s) Signatur€(s): Name of Applicant: E-mail Address:rax: 9r{Q - 52os Type of Review and Fee: F. Changes to Approved Plans Submittal Requirements: $20 For revisions to plans already approved by Planning Staff or the Design Review Board. ?"nn". To The ApproveJi,"n, Application for Design Review General Information: All poects requiring design review must receive approval prior to submiting a bullding permit applicauon. please refer to the submittal requirements for the particular approval that is requested. An application idr Design Rwiew cannot be accepted until all required information is recelved by the Community Development Deparfnint, Theproject may also need to be re\riewed by the Town Council and/or the Planning and Environmental Commission. D€sign review approval lapses unless a building permlt ls issued and construcfion commences within one year of the approval. Description of the Requese Rcuirion to ofrc-y- , p.rannw6 -It-gZ. A.SSIa:1.tElPU;.onzf r^rr,.o,..t,''' T" l.lon-n.rf:T. Re#n-ra,@ -Tfy \( L-./l{Z'ler r/'l.ttt4- D,\^{A{LF EALILT EFrrf.lOM I ..rr,sor:]. ( Locationof theProposal: tot 4 ebck:-suooivision: Liarrsridsc, Loap Fil. No , q Physical Addrcss: \ uailingnaaress: PO Box 53oo , Avon, Ct>;: v 0 d'c W @ Mailing Address: For Office Use Onlv: V <1 t Fee Paid: Z S -= CheckNo.: LV' By: sG. oaTb Flcde\,AFORMS\Permits\Planning\DRB\drb-change_to_appro\€dJrlsns_1Jage_05-1 1-2006.doc $TT 3l E H 5!E $i iig EE iii*E lliE rFi Etr rililGVIL - EATETEfI, gIDIFAfMYf, T _AL{_&, r tPrnp we o fo)*7 $lF it+:l>ils l{ lrn IFt< IIlolz. "riltif oF\tilL OESKN REI/IHT . STAFF AI'PFPVAL \. ss, 6-i,4& ', nn w? 'il'iili,$ ++"* e.lr E IrutrNsl t DEIilGN R]EVIEUI, S'AFFAFFHWAL FSFJ a$ e=4+ Hg Et- Rmz-l RF Tgq* Pr6u FH;g gm tn rnrnx 70 Ul --.r --lo6 f,nI mx (n-{ =o oo 6--t o 6 EA =Cl H* Hg $BFe HfrfiF^H€* o 4 € { dI El I $gfiA Ss mFm ul'b 1- r*P *a d- *n 8-)t{-oL "u,, t \t^ | A August 21,2006 Town of Vail Community Development 75 South Frontage Road Vail, Colorado 81657 Re: 1401 Lionsridge LooP Changes to Approved Plans Deck Revision Atbr: Warren CamPbell OOqS E BEAVER Cneex BLvo SUITE 207 Box 5500 AvoN, C0 81.620 970.949.5200 vmdo@vmdo.com Fax.949.5205 The attached drawings are for a rcvision to previously approved plans to l40l Lionsridge Loop. The proposed changes are as fbllows: 1. Remove remaining aspen tree at deck af,ea to the East of the home. Upon removal of the two tr"", udlu".nt to this ffee, it was determined that the root systems of all three trees where commingled. The owner will plant another tree outside of the deck area when this tree is removed. 2. Remove existing transom window on the Northwest elevation and replace with a larger 7'-1" x 5'-0" picture window. The window will match the windows on the home. 3. Remove stone below the windows as shown on the Southeast and Southwest elevations. The wall has deteriorated along this area. We are proposing to replace the wall and replace the existing stone with vertical siding to match the building. Please contact Al Williams (Owner) 471-1200 for site visit or further questions' Chris J CC: Al Williams Attachments: Application, Elevations, Deck Plan Sincerely, VMDA 970-949-5200 TOWNOFVAIL. COLORADO Staternent Number: Palment Method: WII.I,AMS R060001273 Amount: Cheek Statement $20.00 08/22/200608:10 AM Init : rTS Notat.ion: 4577 /ALFF.ED Permit No: Parcel No: Site Addrees: Location: This Payment: ACCOI.JNT ITEM LIST: Account Code DR 0 01000 03 LL2200 DRBo603I4 2L03-t22-0200-6 14 O 1 LIONS RIDGE I,P VAII., 1401 LIONSRIDCE IloOP $20.00 DeBcript ion Tltle: DRB-Chg to Appr Plans Total Fees: Total A].IIJ Pmts : Balance: $20.00 $20.00 90.00 DESIGN REVIEW FEES Currenu Pmts 20.00 Design Review Board ACTIOI{ FOR},I Department of Comrnunis Development 75 South FrontaEe Road, Vail, Colorado 81657 tel: 970.479.21.39 fax:9V0.479.2457 web: www.vailgov.com Project Name: WILLIAMS RES. LANDSCAPING Project Descripdon: FINAL APPROVAL FORTHE REMOVAL OF 2 ASPEN TREES, REPLACE WTTH 2 CONIFERTREES Participants: OWNER wrLuAMt ALFRED H. & SUZAN 0613012006 PO BOX 18420 AVON co 81620 APPUCANT VICTOR MARK DONALDSON ARCHIT06/30/2005 Phone: 949-5200 Project Address: 1,101 UONS RIDGE LP VAIL Location: 1401 UONSRIDGE LOOP Legal Description: Lot: 4 Block 3 SuMivision: LION'S RIDGE FIL. 2 Parcel Number= 2lO3-122-0200-6 Comments: SeeConditions DRB Number: DRB060268 Motlon By: Second By: Vote: Condltlons: BOARD/STAFF ACTION Action: STAFFAPR Date of Approvalt O7 I 1912006 Gond: 8 (P|-AN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). @nd:0 (PLAN): DRB approval does not consUtute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 DRB approval shall not become valid for 20 days following the date of approval. Cond: 202 Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Cond: CONOffi82,lB The applicant shall install temporary irrigation to the new evergreen trees to insure their survival on a south facing slope. Once the trees have established themselves, minimum of one-year, the temporary irrigation may be removed. The new trees shall be planted prior to requesting Planning Inspections for the o<terior remodel on the house. Planner: warren o"t',ons retaio: $2o.oo *m Departrnent of Community Development 75 South Frontage Road, Vail, Colorado 81657 teli 9-10.47 9.2128 fax: 970,479,2452 web: www.vailgov.com General Information: All projects requiring design review must receive appro\ral prior to submifring a building permit application. Please refer to the submittal requirements for the partjcrrlar approval that is requested. An application for Design Review cannot be accepted until all required information is received by the C-ommunity Development Department. The project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission. Design rcview approval lapses unless a building p€rmit is issued and construction commences within one year of th€ approval, Minor Exterior Alterations Application for Design Review Location of th€ Proposal: t-ot: rl aock:- Physical Address: Parcel No.i zoning:!S Name(s) of Owner(s): I Mailing Address: I Owner(s) Signature(s): Name of Applicant: Type of Review and Fee: tr Signs tr Conceptual Review E New ConstructionI Addition n Minor Alteration (multFfamily/mmmercial) M Minor Alteration/ " (single-family/duplex) tr Changes to Approved Plans tr Separation Request (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.) . L-\lr 5 No, d vt v{oc or,re$50 Plus $1.00 per square foot of tobl sign area. No Fee $650 For construction ofa new buildirE or demo/rebuild. $300 For an addition where square footage is added to any residential or commercial building (includes 250 additions & interior conversions). $250 For minor changes to buildings and site improvements. such as. re-roofing, painting, window additions, landscaping, fences and retaining wallg etc. $20 For minor changes to buildings and site improvemenb, such as, re roofing, painting, window additions, landscaping, fences and retaining walls, etc. $20 For revisions to plans already approved by Planning Staff or the Design Review Board, No Fee Mailing Address: L'Jrff"Zt gtt. cn",r. no., LILV ev, MeerinoDare: 7- Z -6b DR Planner: = Project No. *******'it***t**+**************r3*********************+**+++*tt**+t*+********r*******+*+*+*+** TOWNOFVAIL, COLORADO Statement Number: R050000906 Amount: $20.00 06/30/200609:23 AM Payment Method:Check Init ! ils 2 42 4 / CHRISTOPHER JUERGENS Stat€ment lilotation: $20.00 ******* 9f $**++******'** * *+* ***********+**** *:1. !t*{r*****{r* * * * + * * * * * **+**** * * *'}*+******* * * * * * * *:} * Permit No: DR8060258 Type: DRB-Minor Alt,SFR/DUP Parcel No: 2LO3-L22-O2OO-6 Site Address ! 1401 LIONS RIDGE LP VAIL Locatsion: 1401 LIONSRIDGE IJOOP Total Fees: Tot,al ALL Pmts : Balance: This Palment: ACCOIJNT ITEM LIST: Account Code DR 001000031L2200 Description DESIGN REVTEW FEES $20.00 $20.00 90.00 Curren! Pmts 20.00 c June 29,2006 Town of Vail Community Development 75 South Frontage Road Vail. Colorado 81657 Re: 1401 Lionsridge Loop Minor Exterior Alteration Attn: Warren Camobell 004 8 E B EAVE R CREEK BLVD SUIIE 207 Box 5100 AvoN, C0 81620 970.949.5200 vmdo@vmdo.com Frx.949.5205 The attached drawings and photographs are for a minor exterior alteration to l40l Lionsridge Loop. It is the intention of the owner to remove two existing aspen trees from the property. These trces shall be replaced by two new conif.erous trees (6'-0" high). The reasons which necessitate the removal of these trees are as follows: l. Tree is falling toward the residence. The base of its trunk is bound to the base of another tree in order to keep it upright. Even with the strap in place, the tree still hangs over the roofofthe residence. 2. Tree is diseased md rotting. 3. Trees are too close to the building and are oppressive to the exiting flom the living room. When the trees were planted they were likely six feet tall and fit nicely near the deck. Now that the trees are mature, they are interfering with the structure around the deck and building. Please contact Al Williams (Owner) 47l-1200 for site visit or further questions. Sincerely, VMDA 970-949-5200 CC: Al Williams Attachments: Application, Photos, Site PIan. PROPOSED I.ANDSCAPING Botanical Name Common Name Ouantitv Size PROPOSED TREES AND SHRUBS EXIfiNG TREES TO BE REMOVED Cort,{<c ----a- .lv A*p*'' & -N- Minimum Requirements for Landscaping: Deciduous Trees - 2" Caliper Coniferous Trees - 6' in height Shrubs - 5 Gal. Type Souare Footao€ GROUND COVER SOD SEED IRRIGATION TYPE OF EROSION CONTROL Please specifu other landscape features (i.e. retaining walls, fences, swimming pools, etc.) F:\cdev\FoRMs\Permits\Planning\DRB\drb minor-alt 11-23-2005.doc Page 7 of 13 LLl23/2005 'l hIrl 3# =-5p_ + _lrcr'l#l I -."- - I' // I3.v. *.r. -, rtt ra 4.,'I ii;' * I t I I !6EA O -|,.r-l|-O i-rr,.*BolD -|,iron .Er. lr-tu &rs -.lrsranFrff.-.trtt !rrff5.Fl OO48 E EEAlIER ffiEtr BI.VD $ulTE 207 B0x 5300 AV0N, C0.8r020 970.949,5200 vlnda@l,|Ild a.co|n FAX 949.5205 v,E --lBJh9>Futo9 -t9B<BAEr^da=1 E<3z q, v,:l -'t--_ ---*t;#:lS ::, $f -=---- :--,.= .:= -: 1-],-\ i +>, -.,,'.-. --+ __-,._ - --.--------' ' --:-*:::--,-:__-___:r=/ *qo g,.- _,- __ _:11, -_--F=. :._'- -- - _ _:l:-_====_r*= *- -_ _ -___ :_ - - . _\_ - _ =-_ - ;:=J_- -L_. - ._1, . ___,_,--.--;-,'--.--::,'- - : - ---: --," 1 .t.--,'.) -- ;J- t.rf.-....-.- -..-.---=l -,-,-,1-:t. *= -:,=-j 1-,-t--- -;, '"'-.. !'; -'13--t N | -' - - -.{ t--:: --,1. ' J1---' -:.-7-.,iliirg-- - \=l;f;l$itl q' t'10;.1';..:.,1.1-.-.._-. , , ,,,,t'::,-,''!'-l,;;,,,;;'.,1::..,.:::r.-'"-'-.'t 1--------7--'T--f --- ----'-:-:-:+*---*--:r--------*-------i--'--"----------7 & ",grg,*,r TOWN OF VAIL DESIGN REVIEW." S?:AFF APPROVAI. , .-l- ----*'.ij I '.--- - .:--_l:,.-. , . I --- '-= --=':+ 1t:. --- :-'' 1-6-oe C0*'[trffrT 0E!E!#ng{T ? /'-'/mLq L Ilesign Revieru Board ACTIOITI FORtrl Departrnent of Community Oevelopment 75 South Frontage Road, \Iail, Colorado 81657 teh 970.479.2139 fax: 97tl.t{79.2.f52 web: rvww.vaitusv,€om Proiect Name: wILLIAMS CHANGE Project llescription: DRBNumber: DR8060370 FINAL APPROVAL FOR A CHANGE TO THE APPROVED PI.ANS TO CHANGE THE DECK Participants: owNER WILUAMS, ALFRED H. & SUZAN 08/14/2006 PO BOX 18420 AVON co 81620 APPUCANT VICTORMARK DONALDSON ARCHITE0S/14|2006 Phone: 949-5200 ProjedAddress: 1401 LIONS RIDGE LpVAIL 1.101 UONSRIDGE LOOP Location: Legal Description: Lot 4 Block: 3 $rbdivision: LION'S RIDGE FIL. 2 Parcel Number: 2103-122-0200-5 Comments: SeeConditions Motion By: Second By: Vote: Conditions: BOARD/STAFF ACTION Action: STAFFAPR Date of Approval: 09/0612006 Cond: 8 (P|AN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction adivnies. Cond: 201 DRB approval shall not become valid for 20 days following the date of approval. Cond:202 Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion. Cond: CON0008365 The applicant shall match all materials on the new deck to those exisitng on the deck to be removed, Planner: WarrenCampbell DRB Fee Paid: $2O.OO ; t Changes To The Approved Plansffi\ Application for Design Reviewfi\ r\dt*\ 1-/4.I Department of Community Development ,r*r,orffi. i{' 75 South Frontage Road, Vail, Colorado 81657 .lUnYUf ynltr,/ tel: 970.479.2128 faxi970.479.2452 web: www.vailgw.com General Informataon: All projects requiring design review must receive approval prior to submitting a building permit application. Please refer to the submittal requirements for the particular approval that is requested. An application for Design Review cannot be accepted until all required information is received by the Community Development Department. The project may also need to be reviewed by the Town C.ouncil and/or the Planning and Environmental Commission. Design r€vi€w approval lapses unless a building permit is issued and construction commences within one year of the approval. Description of the Requestl Name(s) of Owner(s)l Mailing Address: Owner(s) Sagnature(s)i Name of Applicant: For revisions to plans already approved by planning Staff or the Design Review Board. Locationof theProposatt tot:? etock:-suUaivision:AiOr,r5ert"r.€' klc\r€[. physicarAddressr {LtOl Liors.se-rv a L,oOP Zoning: p N 6)'P\ 6\ o tAlv o $20 (Contact Eagle Co. Assessor at 970-328-8640 for parcel no,) F;'.'rff * tZ8nlb cnecr r'ro., { s./6 F:\cdelAFORMS\Permits\Planning\DRB\drb_change_to_approved_!lans-1_page_05-11-2006-doc R August 10, 2006 Town of Vail Community Development 75 South Frontage Road Vail, Colorado 81657 Re: 1401 Lionsridge Loop Changes to Approved Plans Deck Revision A1ln: Warren Campbell 0048 E BEAVER CREEK BLvD SUiJE 207 Box 5500 Av0N, C0 81620 970.949.5200 vmdo@vmdo.com FAX.949.5205 The attached drawings and photographs are for a revision to previously approved plans to 1401 Lionsridge Loop. The attached plan is a new deck reconfiguration for the East Deck on the existing. It came to the attention of the owner that the existins deck is structurally not sound and wilt need to be replaced. The guardrail will match the existing guardrail walls on the home, see attached photos. Please contact Al Williams (Owner) 471-1200 for site visit or further questions. Sincerely, \ 0l.M Chris Juergens VMDA 970-949-5200 CC: Al Williams Attachments: Application, Photo Deck Plan. R$ i8 $E $H E il$+ ? E E H 6F- E l f,* E- EHIH F$F$ I $F $H NE I fi fi u Etu $ H3 v. F d HpiE =Bls* sg TPWN OF VAIT DESIGN REVIEW STAFF APPROVAI. .. )L- 06 -o I ll ctlt' : niJ V \)tuD F { JJ { J { \) 0- F lu T H le $lla VAIL DESIGN REVIFW STA Ff- .4' r''l :1.)\ /Al- T-tr"- oa LdcLr - }JfHlfltt RIIfD$tct Itftl- - wtfilfl &filfil{lil r{0r tm$mcf l00P, t,ilL ruoru)(}, s1657 Birc|:r}€.9pe tlfttl--$GJ3et" *.ft' tE Fda*{ ARCHI '****+*d.******++***********'S***************:t *'l**1.*********************,i**************r.i.****{.{. TOWNOFVAIL, COLORADO Sbtement********'f*********+'******!F********++*+++*****+***+++**+******'$************************+**+** Statement, Nutdber: R060001215 Amormt: 920.00 Oe/L4/200603:43 pM Paltment Method: Check Init : .fS Notation: 4576lAL,FRED WTLI,TAMS Permit No: DR8060370 fype: DRB-Chg tso Appr plans Parcel No: 2tO3-122-0200-6' Sitse Address: 1401 LIONS RIDGE Lp VAIL Lrocation: 1401 LIONSRIDGE LOOP Total Fees: $20.00This Palzment,: $20.00 Total ALL Pmts: g2O.OO BaLance: $0.00*************+***,t {.*******+**********************++++****'}**********+********************.r** ACCOUNT ITEM LIST: Aecor:nt Code DescriDtion Current pmts DR OO].OOOO3T122OO DESIGN REVTEW FEES 20,00 tr*n*X{TT lxtrunF[Efit 1L*t Design Review Eoard ACTIOT{ FORITf Department of Comrnunity Development 75 9outh Frontage Road, Vail, Colorado 81557 tel: 970.4/9.tt39 tax:9f0,479.2,{52 rveb: www.vaitgov.com Prcject Name: Project Description: Participants: Project Addressl Legal Description: Parcel Number: Comments: WILUAMS RES. BffERIOR REMODEL DRB Number: DR8050153 FINAL APPROVAL TO REPIACE ROOF W|IH A 50 yR SHINGLE, SIDING, WINDOWS, ADD 4 WINDOWS/DOORS owNER HART, RICHARD H. &IANE y. 05/15/2006 1401 UONS RIDGE LOOP VAIL co 81657 APPLICANT VICTOR MARK DONALDSON ARCHIT05/ t5 12006 Phone: 9z19-5200 PO BOX 5300 AVON co 81620 1401UONS RIDGE LPVAIL Location: 140l UONSRIDGE LOOP Lot: 4 Block: 3 Subdivision: LION'S RIDGE FIL. 2 2103-122-0200-6 SEE CONDMONS Motign By: Second By: Vote: Conditions; BOARD/STAFF ACTION Action: STAFFAPR Date of Approvalz o6lo7120o6 Cond:8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s), Cond:0 (P|-AN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 DRB approval shall not become valid for 20 days following the date of approval. Cond:202 Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued tor,vard completion. Cond: CON0008098 THE APPUCANT SHALL INSTALL THE NEW HARDIE PLANK SIDING IN A MANNER IN WHICH NO CUT ENDS ARE EXPOSED. CUTS ENDS SHOULD BE HIDDEN FROM VIEW BY OTHER PLANKS, TRIM, ETC. cona: coNo?eogs EVERY EFFORT SHALL BE MADE TO PROTECT THE EXISITNG VEGFTATION ON SNE. ANY DISIURBE AREAS WILL BE REQUIRED TO BE RETURNED TO THE STATE THEY WERE IN PRIOR TO CONSTRUCflON. nO TREE REMOVALS ARE APPROVED AS A PART OF THIS APPUCATION. Warren Campbell DRB Fee Paid: $20,00 I Minor Exterior Alteratlts Application for Design Re Department of Community Darelopment 75 South Frontage Road, Vail, Colorado 81657 tel: 970.479.2128 fax: 970,479.2452 web: www.vailgw.com General Information: All projects requiring design review rnust receive approval prior to submining a building permit application. Please refur to the submittal requiremenE for the particular approval that is reque$ed. An applicaton for Design Rwiew cannot be accepted until all required informaUon is received by the Community Development Depaftment. The poject may also need to be reviewed by the Town Council and/or the Planning and Environmenbl Crmmission. Design review approval lapses unless a building pennit is issued and construction comnrences within one year of the appmval Location of the Proposa lz totz 4 ebck:- Subdivision: Physical Address: Parcel No.:3/J Zoning: Name(s) of Owner(s): Owner(s) Signature(s): Name of Applicant: Mailing Address: 0 6\ o o\ l'dType of Review and Fee: tr Signs tr Conceptual Review O New ConstructionD Addition tr Minor Alteration ( multi-family/commerdal) >g Minor Ateration ./ \single-family/duplex) tr Changes to Approved Plans n Separation Request $50 Plus $1.00 per squarc foot of total sign area. No Fee $650 For construction ofa new building or demo/rebuild. $300 For an addition where square footage is added to any residential or commercial building (includes 250 additions & interior conversions). $250 For minor changes to buildings and site improvements, such as, re-roofing, paintng, window additions, landscaping, fences and retaining walls, etc $20 For minor changes to buildings and site improvements, such as, re-roofing, painting, window additions, landscaping, fences and retaining walls, etc. $20 For revisions to plans already approved by Planning Staff or the Design Review Board. No Fee (Contact Eagle Co. Assessor at 970-328-8640 for parcel no.) Mailing Address: Phone: .!j. r.- tr ,,' j'li af,' tiI tf.frt ;J . '; .r'ilr ). ,j .,1,-.-4 r, " .j-' -,-]t l i';;t V}4DA ilffinrqtY DEED ETRT PA6E B2Ig3 .-.-.:YLu!'ryL6--l-E: 4e sresasszf THIS DEED, uade on thls doy sf MaY *titi*i-". HARI ArdD JAlrl YoR* , bet$ccn ,rrd state of COLOR'IPO ' ol thr Grantor(s)' ard e rthogeof theof WlTltESS, Ihat the Grantot(s)' t"t-"* tt,".TiT::::T":i the sun of (S1,?98'500'00 DOLLARS .- -HH,h :I:H"ffi ;ili*n' t*".'* **" i:5-i:' :il:;*"J'il:-*ll##"i:i,'r.ti' j##*il*l,liffi $'n ji*;#,qf iffi*'il; ;ji.ltril#;ff i#rn?:#1*t:;'"u;qiffi EU-"":l+:i,{il:#,'i#**d;#r'r+*i'ii.l.i' 'ao*.r!**:t ii:,rpffi l^..;;;;i1"1;'41i"#ffi s"i'l"JlHiliifft "*:iuuo sE?rEuBEn*'[$,ffi f#i#.ffirrrgs',"9'$"3Fut#'H':iiLC*Y'$1$1amil;ll*-"tlr aE " r'|rD'^'r rrD FotEvER osrrlb the above barsained-fl::t::t":1":* fri?ltif"i:fii*'i rhe crantor(s) ehatl and-rilt *lltlg.l-:jt:::il.lltl!"r*, arr.end €verv Sljl?;;-'.rn*rrr, and ths u3e or € .lgoknormasstfGetr*rnberl40lLIoNgRIDGEwoelt.IoNsRII,GEFlL2I.roT:{vA'I,co81657 ffi' of the countY of A'.FRED H. lfILtrIt'MS ANn sozlll N. lfllr&lrMg lcgal address ts : ElE !i'"ii' #- lre!iqt!:. l:. :It T*"ll :hTttmilff U*"dih Iil-i;;''t or( s t ha. sx€cuted' SIAIE 0f COIIO8.RDO )ss. ColntY of AICI"E ) fr.,,,,*",,'*,';l.i$"iii:.Hl#if:iiihillilr,:i,il,:{#til}.'*l''ii}s"#i'i"'q#*:'u:'Y ll; i:'l: il:":::?H"l;'.i$l.i$"!iil$il#i5"*"li:ilFii:;h*i,:"#i[I ffr;i il"0:fiilir;'#'ir; ui" 'i a6v scrdar Il-.-. -"nt thereof. fh: 3!l. I r ---r-,6 -a, -/ ,^- r-r- ..+ {^dth ehva. F i ted f ot record thc-,-J ffi otctock-J day of 'A'D' I o\-'--" BY ieccption llo' iffiE-YoEmARr lhe foresolng lns-truEnt.uEs Tlf,Jt'J3**o';fifrT tttt 't " ffiliHtE'#Hbmn:1se lly co rl Ui tl|cs3 .Sftft q- #**kF1' ' ii:# s8ll::li Uhen Fecordcd Return to: E66T-SEEEiiPIion t n*ro *. tlllttAlls Allg suzAll ll' ullllAlls rorrn e5 084!491-49!3I (Joint Tenants PO Box 18420, ^vol, co 81620 (t269690) -:;!E!.'-.*-E -19:4e s7ae4e52al'VMDA FAGE AYBS (hrr Orrlcr No' V50012694'6 EXIII''I,T 4 tfi qp$fl6tr+"Uif'l;;}ilfitilf}Stfi #$'fi3#H:fl ; l,.s,ll;Jl,il+tTlJ,tr#,Tf a,".ill+l8:?xilrHi;ER,Pl#l'-iH;1"-ilsf il"" ;il,;N uoor ls Ar PAGE 542' REsrRrcrrvEqgv:llfiiytfgJ-?ilii?'l."liil$r,ff pffijliTf i{F^iy'- fi SH'fiSHl.i#ff1ilff;ulsex'-lglya3l,ornroRrGrN,ANcEsrRY,oR AMENDED IN DOCUMI EASEMENT AND RIGHT OF wAY As olfllF'D'Tro HoLY CROSS El',ECTRlc AssoclArtoN' '*t" tni"]i*tiiiinul"er'.,r nuc6nieu AuGUst 24' te67 lN BOOK2II AT PAGE IO3- 'w'-xl-*pi'*#rrdi-uli,e*-$lt#**lF*T* NO' 2, RECORDED SEPTI'MEEK z'r r7r" EASEMENrS,cllP:li"Jii""3,"F$fJ'ffi it1,'l$l$l'3T'tTi3txt;tssANDNorEs ON TIIE PLAT OF LI( 'E'TEMBER 20, ts'ziiiriil'fi nBcnpmoN No' rztzre' (ITEM INTENTIONALLY DELETED} PROPOSED MATERIAIS Tvoe of Material ColorBuildino Materials Roof Siding Other Wall Materials Fascia Soffits Windows WindowTrim Doors Door Trim Hand or Deck Rails Flues Flashing Chimneys Trash Enclosures Greenhouses Retaining Walls Exterior Lighting Other Nft F/tpTctt 6{tral c"- To Pannx) ,tt+rurcu.t 5t prn/c.. (n LDe_ Notes: Please speciff the manufacturer's name, the color name and number and attach a color chip. F: \cdev\FORMS\PERMrrS\Planning\drb_mlnor_alt_l1-23-2005 ;doc LLl23l200S TI eawuqtxt lr\/* Page 6 of 13 o a a a a Location of all required parking spaces Snow storage areas. Proposed dumpster location and detail of dumpster enclosure. Retaining walls with proposed elevations at top and bottom of walls. A detailed cross-section and elevation drawings shall be provided on the plan or separate sheet. Stamped engineering drawings are required for walls between 4' and 6' feet in height. Delineate areas to be phased and appropriate timing, if applicable . Location of existing trees, 4"or larger,, Indicate trees to remain, to be relocated (including new location), and to pe removed. Large sbnds of trees may be shorrrn (as bubble) if the strand is not being the proposed improvements and grading.. Indicate all existing ground. Detailed legend, listing the and size (caliper for deciduous trees, height for conifers, gallon and shrubs. size for shrubs and height flr foundation shrubs) of all the existing and proposed plant material including ground cover.. Delineate critical root for existing trees in close proximity to site grading and construction.. Indicate the location of 4i proposed plantings.. The location and type f existing and proposed witering systems to be employed in caring for plant material its installation.. Existing and contour lines. Retaining walls shall be inbluded with the bottom of wall Indicate type, location and fixtures. Include height above grade,output, luminous area Attach a cut For all proposals to repaint existing buildings, the following supplemental information is required: Cnlor chip or color sample including the manufacturer name and color numbe(s) Architectural elevation drawings which clearly indicate the location of proposed colors (ie. siding, stucco, window trim, doors, fascia, soffiits,'etc,) F:\cdev\FORMS\PERMITS\Planning\drb_minor_alLl 1-23-2005.doc 11/?3/2005 the top of wall and ra a a Page 5 of 13 A May 15,2006 Town of Vail Community Development 75 South Frontage Road Vail, Colorado 81657 Re: l40l Lionsridge Loop Minor Exterior Alteration 0048 E BEAVER CReer Brvo SurrE 207 Box 5300 AvoN, C0 81620 970.949.5200 vmdo@vmdo.com FAx.949.5205 The attached drawings and photographs are for a minor exterior alteration to 1401 Lionsridge Loop. It is the intention of the owner to upgrade the exterior envelope of the home into a maintenance free system. These minor alterations include the following: 1. Replace all existing wood windows and glass panes with aluminum clad wood windows. Color to match siding. ln addition, the windows are being altered in four locations illustrated on the drawings and photos. The owner's intent is to keep the comer window appearance on the home, while allowing a vertical comer mullion so the windows will perform as designed. 2. Replace all the vertical siding with a hardie board vertical siding. Along with the siding replacement, the owner is considering upgrading the R value of the exterior walls from an R-l1 to and R-19 or greater. This may be done from the inside, or with a rigid insulation applied under the new siding. Color sample attached, this color will match existing color of the home. Color will be a low sheen or flat color. 3. Replace existing asphalt roof with new asphalt roof. Elk Prestique raised profile; color Barkwood, color copy sample attached. (80 mph rated). Sincerelv- Chris J VMDA 970-949-5200 CC: Al Williams Attachments: Application, Photos, Plans, Elevations, Color Sample, Roof sample copy. x***********+'t****************++++*******t**********************+++*+**+++****************** TOWNOFVAIL, COLORADO StaK(nCNT******{r*****'}**+**********+****+***+***++**************************** *** * * * * + + + * * * + + * + + * * * ** Statement Nr.uriber: R050000599 Amount: 92O.OO OS/15/200604:28 pM Payment Method: Check fniE.: JS Notation: 417 0 /VICTOR IVIARK DONALDSON ARCHITEETS Permit No: DRB0E0163 qrpe: DRB-Minor A1t,SFR/DUPParcel No: 2!O3-f22-02O0-6 Site Address: t4O1 LIONS RIDGE Irp VAIL,IJocation: L4 01 LfONSRIDGE IJOOP Total Fees: S20. OOThis Payment: $20.00 Total A]JIJ pmts: 920.00Balance: S0.00**++***+********************i.d.d.*****+*******************,F*'F,$*'!****:i,r**'t r.**.t***********,t+*+** ACCOUNT ITEM LIST: Account Code Descript,ion eurrent Pmts DR 00100003LL2200 DEsIcl{ REVIEW FEES 20.00 oFl{>o=oSJt5SJ.--o-, '6 q,) ? el3B€'Ee =HH86 ,rl - E HFHs = Rg Lt-l> LIJ CD LrJ ssE 8EE -C.) o€J -l a-oo -Jru €Da Eg, -o J ocf Ltl CJ =,llt6 -v,lllg v, = -l-l =J 6 =, =,q, -lv, QET<'a=a<\ >< c\t..-o, '6i o) =6=- <5 att!-- 'E LL e 9RFF:r.o- xHnE5 q< e. o-= IJJ <, LLIdt LIJ ssEltt<'-o8E -e> rlle) =rllA -v,rrtv,v, = -JS =E-o -l -r-.<= A* =.4{,5 =,3<.3vt=3=c) !, N \ \ '"s i \: .Jg o tr, 0- o- 'J.ll.d 'q, $t$I fiiifi fl qi*; o = rrato=o$J -5 S{.-_or -- o, + 6ey (g cat!_-'E t_-L = eSaR -r c{ c.) <o6 ,r, - E HFHsO P6ELrl <> LIJ6 IJJ tL \o rl'iii Set6{-o8E ea rllCJ =,rrtAq tl|g, v, = 3s =E-8el -l-<= 6{ =={,9 =3<,2c/, =3=qr= l s ?s \\) LL:o' 7lol Fl{l>l 5lurl FI SliKhIl+Ft-vt. otHzlB /'--\t9EEE o F oFr.()a=o<\l x c\t.._qr -6 0->q6rT 8Ese qRES 6 .r, - 5 HFHeA e=t o-= lrleLll CD Lt-l \O tt- -Q g- ,.r- Q <rf Oi! 4t i- f r&te) =,rllAv,rlfg v, = -l r-J3 --E,- -o -l -r'<,=E a{ =,E{,5 =,?<,2vt=E)=vr! 0539 r40r il0NtRrD6r r00l vail., c0r0RAD0, 8165i AR: Ii I - ECTS t rl .r! ,l 1 ,{B.a b-- Vlt\{ 2- NORI|IIAJI tttVAIlON Nt\,/ ttlDtR D00R L0CAIIOl.| #3 \{ILLIAfis?I5IDINII ,40r U0tlJRtD6t t00P valL. i0L0R/1D0. Bl65/ \/tf\,v 3 t0|]llit{t5l tLtvlil0N .l'li\{ wlNDOvJ rN tTUDy i/2 0539 ON lll|ItIAfi'?r5D[NCT 0s39 r40l u0t{tRrD6t r.00p, vatt. cot0M00. 8165/ vrr'll 4-50uil{'l|tJt fl.tvalr0il-1{E|, al{l{tt{G VtilDotl at BRta|(fafl aRIA #l o3I \{ILLIAfIS RT'IDTNCI 0539 i"''.. i!' 1.' , GEm rlfrul illl/ i' VII}/ 5 NORTNIASt ILTVAIIO|l CORl.lIR l/Il\|DOW AT DIt'lING ARIA rii,,, illiii llli r,' iirliii llllIl r40r il0l{5RrD6t t"008 vatr. cOt"0RAD0, Bt65/ il Ri l l - F VI[!I 6 -'OUIIIIJIJT fI.TVA]ION .IORNTR v/I}|DO!|l AT BRIAKfAJT ARTA ,. utrlua/rsftnumcr 0539 r40r rjoilnDGr r.0@, yarL t0tflrDo.8165/ vrtv 7-t0uHilfl trrvailolt .cofffiR utt{DfrtJ ar Ul|il6 R00l[ & BtDRoor Elk Building hoducts, lnc.ofroofing, composirc building... Page I of 2decking milinS o lvlanufrctw€ro Llpme About Elk Pre4uelg Peied Plalning Produst Pholos Warranty & Rgg istration Homeowner Support Contacl Us Mew Home Photos \Nhere To Buy View Application / Spec Sheel ' Product Limited Warranty htp ://www.elkcorp.com/lromeonmerVproducts/shingles_raisedprofi le.cfi n ffi RarsedPror'ile'& fKLtIILts Sffitu=fi,ffi"ffiL1ffi9fo*j .ffitr#,g5" dfonen*xatty lcnd rny homo a subd!, aalbrnd l6k wlh lhe wemlh of rd- Unlike unt€abd n'ood d*El6s, Ek Rais€d Pmfu shirElos h8E ho rmr*sd ftre|€si!€nca and du.ettlity of |rninfid 3hingl6s. Railed ffie orhr8 a 3o-year &nibd wranty with an opdion for fnibd t mfrrabiliu,' ot up b 70 mph' and, fl(e all Elk shilgbs, is UL Clasa "A- ft+rabd. Colorsurbhes: :'':|. t1EA5E I -I ---Xrtocodl h rit Antique Slate ForBst Green Aspen White Barkwood Birchwood Sandah,rroodHickory Weatheredwood Sablewood Shakewood strst2006 Page I ofl http://www.elkcorp.corr/imagedproducts/swatches/grande/g-barkwood jpg sl15D006 t DEPARTMENT oF coMMU*rrtu*oPMENrTOWN OF VAIL 75 S.FRONTAGEROAD vArL, co 81657 970-479-2138 I-o{1, L-^6"^-.'if^16-A NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT SFR BUILD PERMIT PCTMit #: 806.0159 Project # PRI064191 Iob Address: 1401 LIONS RIDGE LP VAIL Status . . . : ISSUED Location.....: 1401 LIONSRIDGE LOOP Applied . . : Ml2ll2W6 Parcel No...: 2I0312202N6 Issued . .. : Wl2ll2$6 Expires. ..: 0lll7l2ffi7 owNER rrART, RTCHARD H. & ,JANE y. O6/2L/2OO6 1.401. I,IONS RIDGE LOOP VAITJco 81_657 APPIrICAliflr WOODSTONE HOMES, INC. 06/2L/2O06 Phone: 970-845-9698 P.O. BOX 3939 VAII.co 8L558 License: L48-A coNrRAcToR wooDsToNE HoMES, rNC. 06/2T/2005 Phone: 970-845-9698 P.O. BOX 3939 VAIL co 81658 IJicense: 148-A Description: REPITACE ROOF WITII A 50 YR SHINGIJE, SIDII{G, WINDOWS, ADD 4 VIINDOWS/DOORS, NEW KITCITEN, NEISIJOWER LEVIEIJ BATH. Occupancy: R-3/U Type Construction: V-B Valuation: $60,000.00 Revision Valuation: $0,00 Total Sq Ft Added: 0 *:l*t{.********'l,l.**r.t+{.*'|.+*+**:t***f*****:l**,i{<*)i{i*{i*****:t*******{t***)l+ Building---- > $713.75 Restuarant Plan Review--> $0.m Total Calculated Fees- > $1,180.69 Plan Check--- > $463.% Recreation Fe€---------> $O.0O Additional Fer6------ > $125.00 Investigation- > $0.0O TOTAL FEES-------------> $1,180.69 Toal Permit Fee----- > $1,305.69 will Call------> $3.0O Payments----------;' $1,305.69 BALANCE DUE----.> $O.OO Approvals: ItCM: O51OO BUIIJDING DEPARTMEI{IIT 07 /L9/2O06 cgunion Action: AP asbestos abatementpennit required prior to issuance of the building permit. Item: 05400 PLANNING DEPARTI\4ENr 06/23/2006 Warren Action: AP Item: 05500 FIRE DEPARTMENT 06/23/2006 ,JJR Action: Ap Monitored fire alarm system recommended. Fire sprinkler system recommended, Item: 05500 PIIBLIC WORKS See the Conditions section of this Document for any that may apply. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and suMivision codes, design review approved, Intemational Building and Residential Codes and other ordinances of the Town applicable thereto. REQIJESTS FOR INSPECTION SIIALL BE MADE TWENTY-FOUR HOURS ADVAIICE BY TELEPIIONE A.T 47L2149 OR AT OLIR OFfiCE IROM E:00 AM-4PM. OWNER OR CONTRACTO FOR HIMSELF AND OWNER {.***,1**+**rc*************rt**{.{.***,F***********'r*********,F*:**,F*****!{.*********.**.****{.****xr******.*********,i** CONDITIONS OF APPROVAL Permit #: 806-0159 as of O7-21-2ffi6 Status: ISSUED * ** * * * ** **,1.* * * ** ** ** * * *:F ** ** * **<*****,k ** ** *** *:f {.,* ** ** ** **** ** ** ** * * * * * * * * * {. *'t( *,r ** *:* **** ** *rr * ic * t *{.******** Permit Type: ADD/ALT SFR BIILD PERMIT Applied: 06l2ll2Cfi6 Applicant: wooDsToNE HOMES, INC. Iszued: 07t2u2w6970-845-%98 To Expire: 0lll7l2W7 Job Address: 1401 LIONS RIDGE LP VAIL Location: 1401 LIONSRIDGE LOOP Parcel No: 2IO3I22WN6 Description: REPLACE ROOF WITH A 50 YR SHINGLE, SIDING, WINDOWS, ADD 4 WINDOWS/DOORS, NEW KITCHEN, NEWLOWER LE\'EL BATH. +******'k*,k*****:B********r({.*******'F*+********:****** COnditiOnS ******d<********r*{r*{r*ic***{r***{:***+**{.+******'k Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQI.JIRED TO CHECK FOR CODE COMPLIANCE. Cond: 16 (BLDG.): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION R313 OF THE 2OO3 IRC. Cond:18 (BLDG.): STAIRWAYS ARE REQUIRED TO MEET SECTION R311.5 OF THE 2OO3 IRC OR SECTION 1OO9 OF THE 2OO3 IBC. Cond: 19 (BLDG.): GUARDS ARE REQUIRED TO MEET SECTION R3l2 OF THE 2OO3 IRC OR SECTION 1012 OF TT{E 2OO3IBC. ****+++++********************+*++*********rt*'l.t****************+*rtr***********4.{.{.{.4.1.{.'f+*+***** TOWNOFVAIL, COLORADO Statement * * * * + + + + * * * * * ********'t**'B*'l'l********************:l,t**,r*****************{r**dt**'rt*****d.*+**+**+* Statement Nudber: R060001046 tunount 3 Pa).ment Metshod: Check Homes 1-53 2l- $1,305.69 07 /2L/200611:04 AM lnit: DDG Notsatsion: Woodstsone Permit No: Parce1 No: Site Address : Location: This Payment : BP 0 010 0 0 0311110 0 crr 00100003123000 PF 00100003112300 wc 00r-0000311-2800 806-0159 I!ryIE: ADD/A],T SFR BUIIJD PERMIT 2ro3-r22-0200-6 ]-4 O 1 I,IONS RIDGE LP VAII, ]-4O1 I,TONSRTDGE LOOP Tot.al Fees : $1,305.59 Total AIJL Pmts: Balance; BUf I.,DING PERMIT FEES COIiITRACTOR I,ICENSES PLAN CHECK FEES WILL CAIJL INSPECTION FEE $1-, 30s .69 91. 30s .69 $0.00*********{r* '1.* ********d.i. {.*+*************{.**{.*****+************ * * * * * + + + + + +++***+***+*+****'}*** ACCOUNT ITEMLIST: Accoune Code Description Current Pmta 743.75 125.00 463 -94 3 .00 '"*\,{ 'ij i4;,+}: = !:'': ': NOT BE 75 S. Frontase Rd. Vail, Coloradd 8i65z COMPLETE \/ALUAT|oNS FOR BUTLDING PERMITru'.prc_L6il noo OTHER $ PLUMBING: $MECHANICAL: $TOTAL: $ fer farcel#Conhct Assessors 94Ege af g7eg?g.i864l orvisit tffiffi#.*'**-- '.'rrr*ur rrr** FOR OFFICE USE ONL : - nn r= F-G\EilV/te l-. \r il "[ JUN 16 2006 1of16 TOWN QF-)/A:ll 0z(x}n005 o TeamQuestions? Call the Building at479-2375 Depaftment of Community Development Project Name: Project Address: r' This checklist must be amoleted before a Building permit aaalication is All pages of appllcation is complete ,'{ autDRB approval obtained (if required) provide a copy of approvat form C J € E T{. | ) ^l p Plan Check Fee required at submittal for projects valued over g100,000.00 (see attached fee' schedule) F Complete site plan submittedf' N{Ao Public Way Permit application included if applicable (refer to Public Works checklist) P staging plan included (refer to Public Work checklist) No dumoster,oarkinq or material storaoe - allowed on roadways and shoulderc without written aporovat d-Asbestos test and results submitted if demolition is occurring F _ Architect stamp and signature (All Commercial and Multi family) fl Full floor plans including building sc*iensand elevations(3 sets for remodels, 4 sets of plans for SFR and Duplex, 5 sets of plans for MultFFamily and Commercial Buildings) ff window and door schedule (. Full structural plans, including design criteria (i.e.loads) fl Structural Engineer stamp and signature on structural plans (All Commercial and Multi family) INlh Soils Report must be submitted prior to footing inspection a{l6, Fire resistive assemblies specified and penetrations indicated F Smoke detectors shown on plans y' fyp"r and quantity of fireplaces shown Applicant's Signature: Date of submittal: Received By: r Eartgexlcb L' oJlA-tQ <^e F: \cde\^FoRMS\PermiG\Building\buildingjermit. DOC Page 2 of 16 0210912005 PLAN CHECK FEES TABLE . Dflatuleftof@mmunilyMopmdt Building sf/fely and Inq&ian &rvi@s 75 h,ttt FtonbgeRoad Vail, @londo 87657 970479-2138 FM 970479-2452 www.tnllgw.am Plan check fees are required for proJects with a valuation over $100,000, at the time of Building permit submitbl. Please use the table below to calculate your plan check fee tobl. $100,000-$150,000 Multiply by $150,001-$250,000 Multiply by $250,001-$,100,000 Multipty by $401,000-$750,000 Multiply by $750,001-$1,000,000 Multiply by .0055 of Valuation Tobl .005 of Valuafion Tobl .0045 of Valuation Total .004 of Valuafion Tobl .0035 of Valuation Tobl Valuations over $1,000,000 will be calculated by the Town of Vall Bullding DepartnrenL If you have any further questions, please contact the Town of Vail Building Deparknent at97047g-Ztag. F:\cdev\FoRt"ls\Pennlb\Building\buitdnlpermilDOC Page 3 of 16 oas9pg05 oo|D[.sl|YEanElaFEM Design ACTXOI{ FORFI Dsparfinont of f,.ommuntty llevelopment 75 South Frontage Road, Vail, Colordo 8165/ tsl: 970.{79,2139 faxzg7A.4W.2452 treb: wwunallgov.com o Review Bo€ ProJect Name: WLIIAMS RES. DOERIOR REMODEL ProJect Dwipdon: DRBNumber: DR8060163 FIML APPROVALTO REPIACE ROOF WIni A 50 yR SHINGIE, SIDING, \TVINDOWS. ADD 4 wINDOWS/DOORS Parddpants: OWNER HART, RICHARD H. & JANE y. 05/15/2006 l,IO1UONS RIDGE LOOP VAIL co 8165/ APPUCANT VICTOR MARK DOMLDSON ARCHII05/15/2006 Phone: 949-5200 PO BOX 5300 AVON co 81620 ProJetAddres: 1401 UONS RIDGE tP VAII Loedon: 1401 UONSRIDGE L@P tegal MpHon: Lot! 4 Blak 3 SubdMsion: LION'S RIDGE RL 2 Parcel Numben 2103-122{200-5 Comments: SEE@NDmONS Modon By: Second By: Vob! Gondldons: BOARD/STAFF ACTION Acton: STAFFAPR Date of Appruualz 0610il2m6 Oond:8 (PLAN): No change to these plans may be made without the written consent of Town of Vail sffiand/or the approprlate revlew commlttee(s). Cond:0 (PI-AN): DRB approval dos not constitute a permit br buildlng. Please consult wlth Town of Vall Bulldlng personnel prlor to constucdon acfivites. Cond: 201 DRB approval shall not become mlid for 20 days followlng the date of apprcval. Gond: 202 Approml of this project shall lapse and become vold one (1) year following the date of final approml, unls a building permit ls lssued and consffuction is commenced and is diligently pursued bward compleHon. Oond: CON@08098 THE APPUCANT SHALI INSIATI THE NEW HARDIE PI.ANK SIDING IN A MANNER IN W}IICH NO CUI ENDS ARE D@OSED. CUTS ENDS SHOUTD BE HIDDEN FROM VIEW BY OTHER PI.ANI(S, TRIM, ETC. ono: cor,rteoee O EVERY EFFORT SHALL BE MADE TO PRO'IECTTHE BCSilNG VEGETATION ON SITE. At'lY DISIURBE AREAS WII BE REQI,'IRED TO BE REruRNED TO THE STATE THEY WERE IN PRIOR TO CONSTRUCNON. nO TREE REMOVAIS ARE APPROVED AS A PART OF THIS APPUCATION. Planner: Wanen Gmpbell DRB Fee Pald: $20.00 -A-t*!e/Er7v June 1,2006 su$c e "il$flff.tilr c onsultants3' Parker, Colorado 80134 T: (303) 699-7870 F: (303) 680-3192 Al Williams PO Box 18420 Avon, Colorado 81620 Re: Asbestos{ontainingl\Iaterialslnspectlon l40l Lions Ridge Loop, Vai! Coloiado Dear Mr. Williams: The purpose ofthis letter is to report the results ofthe testing for asbestos-containing materials(ACM) at the above-referenced address. The samples wereiollected on May 25, 20-06 at thelocations presented on Table I of the attached report, and were then analyzed on a rush basis. Asexplained in Section 5.0 of the.attached report, the sample re.zults indicate that the texturing ofthe rvalls and ceiling ofthe stairs and second level of the house contain ACM which will rJquireabatement prior to demolition or renovation if the ACM will be impacted. As explained inSection 4.0-of-the report' the Colorado Air Pollution Control Division must be notifi"d prior tothe.removal of 160 square feet ormore of regulated ACM. However, it is important tounderstand that any regulated ACM must be abated prior to renovation if it rnay be disturbedduring remodeling el'en if it is less than 160 squareieet in area- We can assisf you and yourconlractor in preparing an ab-atementrvork plan and identifying abatement subcontractors" if you need this suPport and if you believe that any regulated ACM riitt l" disturbed during ,"nouuiion. Please do not hesitate to contact us with any additional questions you may have regarding theseresults. Sincerely, SUNDANCE Exvmorrrclt[ Cotsurtl:{Ts, [Nc. t7 n' '/l /qs[,.i^Wof Robin M. Fryberger. p.E. Principal Engineer Attrchrnent Chris Juergens" VMD Architects File Sundance Enr"ironmenta I Consuhants. Inc. Environnrental Site .A.ssessments i Aquifer Characterization i Soil and Groundsater Remediation ASBESTOS{ONTNIYING MATERIALS INSPECTION 1/t01 LIONS RIDGE LOOP, VAfL, COLORADO Family Environmental proiect No. F06 May 2fi16 Prqared For: Sundance Environmental Consultants, Inc. Robin Fryberger 9432 Longstone Drive Parker, Colorado E0134 Prepared By: Family Environmental Compliance Senices, Inc. 3650 Chestnut Place Denver, Colorado 80216033 Telephone 303-296-6A2 Fur303-292-1451 e-mail: FamilyEnvim@aol.com TABLEOFCONTENTS I.O INTRODUCTION PageNo. ...1 2.0 BUILDING DESCRJPTIONS 32 Physical Assessment..-_-_.-.... 3J Sample Collection.....-........--...23.4 Asbestos Sample Analysis .........24.0 RECULATORYOVERVIEW 5.0 FINDINGS AND RECOMMENDATTONS .............-..... ..-.-..-.36.0 GEMRALCOMMENTS. APPENDICES Appendix A - Asbestos Sample Summary Appendix B - Asbestos Analytical laboratory Data ASBESTO$CONTAII{ING MAITRIALS SI]RVEY l40l Lions Ridge Loop, Vaif Cotorado Project No: F06 May2006 I.O INIIRODUCTION Family Environmental conducted an asb€stos inspection of the un occupied building tocated at l40lLions Ridge Loop,vail, Colorado' the inspection was conducted on May zs,z006by an accreditedBuilding Inspector. Interior building components rvere inspected and homogeneous areas of suspectasbestos'containing materials (AcM) were visually identified and documented. Although reasonableeffort was made to inspect accessible suspect materials, additional suspect but unsampled materialscould be located in wallg in voids or in other concealed areas. Suspoct ACM was sampled in generalconformance with the sarnpling protocols outlined in EPA regulation 40 cFR 763.g6 (AsbestosHa"ird Emergency Response Act, AHEM). Samples were delivered to an accredited laboratory foranalysis by polarized light micnrscopy. 1.1 Project Obiective we undersgnd that this inspection was requested to prepare for the interior demolition and renovationof this shufire' colorado Regulation #8 and EPA regulation 40 cFR 61, National Emission Standards for Hazardous Air Pollutants (NESHAP), prohibits the release of asbestos fiben to theatmosphere during renovation or demolition activities. The asbestos NESHAP requires thatpotentially regulated asbestos{ontaining building materials be identifid classified and quantifiedprior to planned disturbances or demolition activities. 2.O BUIIDINGDESCRIPTIONS This is an older mountain side multi level concrete and wood singte family residence with a attachedgarage. 3.0 ACMFIELDACTTVTTIES The inspection was conducted by Mr. Samuel Rolf a trained and accredited asbestos Buildinglnspector' The inspection was conducted in general conformance with the sampling protocols established by EPA regulation 40 CFR 763.86, the Asbestos Hazard Emergency Response Act(AHERA). A summary of inspection activities is provided below. l40l Llons Ridge Loop Page2 3.1 Ylsual Assgsment No blueprints, floor plans or other building documentatioa were provided to Family Environmental preceding the inspection. Our inspection activitiec thereforp b€gan wifh visual observation oftheinterior of the building to identify homogeneous areas of susp€ct AcM. A homogeneous area consists of building materials which appear similar throughout in terms of color, texture and date ofapplication. The exterior inspection included visual observation of the structure and the surrounding areas only' Building materials which were not identified as concrete, glass, wood, masonry, metal or rubber were considered suspect ACM. Fiberglass insulation was observed in various locations. 32 Physical Assessment A physical assessment of each horirogeneous area of suspect ACM was conducted to assess the condition of the material as friable or non-friabte. The EPA defines a friable material as one whiclq when dqr, can be cnrmbled, pulverized or reduced to powder by hand pressurg. Friability was assessed by physically touching suspect materials. 33 Sample Collection Based on results of the visual observation. bulk samples of suspect ACM were collected in general conformance with AHERA protocols. Random samples of suspect materials were co[ected in each homogeneous area Samples were ptaced in sealabte containers and labeled with unique sample numbers using an indelible marker. Seventeen (17) bulk samples were collected from the homogeneous areas of suspect ACM. Bulk samples were collected from the exterior siding tape joint compouod, and interior surfacing materials. Homogeneous areas of suspect ACM identified and sampled during the inspection are presented in Appendix A. 3.4 Asb€sto,s Sample Anatysis Bulk samples wele submitted under chain of custo y procedures to Family Analytical t-aboratory Services, Inc of Denver, Coloradq for anatysis by polarized light microscopywith dispenion staining techniques per EPA methodolory (40 cFR 763, Subpart F). Microscopical visual estimation was used in obtaining the percentage of asbestos in bulk samples. Family Analytical laboratory Services, lnc is accredited under the Nationat Voluntary Laboratory Accreditation program NVLAP (2OO44g- 0). 1401 Uons Rldge laop Page3 4.0 REGT'I"ATORYOVERVIHW The asb€slos NESHAP (40 cFR Part 6l) regulates asbeetos fiber emissions and asbestos waste disposal practices. It also requires the identification and classification of edsting building materialsprior to dernolition or renovation activity. Under NESIIAP, asbestosrontaining building materials are classified as either friable, Category I non-friable or Category tr non-friable ACM. Friable materials are those that, when dry, may be crumbled pulverizod or reduced to powder by handprcssure' Category I non ftiable ACM includes packins, gaskets, resilient floor coverings andasphalt roofing products. Category tr non-friable ACM are any materials other than Category Imaterials that contain more than l% asbestos. Friable ACM and Category I and Category tI non-friable ACM which is in poor condition and hasbecome friable or which will be subjecte.d to drilling sanding grinding cusing or abrading andwhich could be crushed or pulverized during anticipated ,.nouution oi dernotition activities are considered regulated ACM (RACI\O. RACM must be removed prior to renovation or dernotitionactivities' If the amount of RACM exceeds 260 linear fe€t of pipe insulation or mote than 160 squarefeet in other building components, the owner or operulor must provide the EpA, the State of ColoradoDeparfinent of Public Heatth and Environmen! Air Pollution Contol Division with writtennotification of planned removal activities at least l0 working days prior to the commencement of asbestos abatement activities. Removal of RACM must be conducted by a trained and appropriately licensed asbestos ahtement contractor. The Occupationat Safety and Health Adminisfration (OSHA) Asbestos shndard for the construction indusFy (29 cFR 19l0.ll0l) regulates workplace exposure to asbestos. The OSIIA standard requires that employee exposure to airbome asbestos fibers be maintained below 0.1 asbestos fibersper cubic centimeter of air (0.1 f/cc). The oSHA standard classifies construction and maintenance activities which could disturb ACM, and specifies wor& practicec and precautions which employers must follow when engaging in each class of regulated work 5.0 IINDINGSANI}RECOMMENDATIONS According to EPA, Colorado Regulation 8, Control of l{azardous Air pollutants, and the OSHA regulations, an ACM is considered any material or product containing more than one percent (>I%) asbestos. Based upon sample results the textured watls and ceilings are considered Asbestos Containing Materials (AcM). The building roof was observed as a asphalt paper and wood shake shingles. The roof rnaterials were not sampled within this scope of worlc, because it is not included in the AHERA criteria and becauseit would require desbuctive sampling techniques. The asphalt and tar impregnated roofing materials are assumed to be ACM. f,aOl LlonsRtd8eLoon According to the Colorado Regulation 8, Conhol of tlazardous Air pollutants, section III, part 3,Paragraph C (i) Roofing Materials: 'Tar impregnated roofing felts, asphalt tiles, asphalts and mastics that are non-friable and willremain non-friable during abatemint.r" "*"rnp f-. this regulatioi.;, According to the colorado Depafinent of Public Health and Environmenf Air pollution controlDivision, it is not necessaq/ to remove these materials prior to the demolition of the building.Additionally, the building debris need not be disposed as asbstos+ontaining waste material, as longas the ACM rernains non-friable, Howevern ttre tananlt receiving the asbestos+ontaining roofing materials rnust be notified ofthe asbestos content. According to the State of Colorado regulatory informatioq ACM roofing components do not need tobe removed as part of the asbestos abatement plan prior to demolition/renonutioo of the building. However the demolition of the building cannot include explosives, sawing (rotary or reciprocating),grinding abrading blasting or intentional buming that wirr render the materiars friable. Homogeneous areas of assumed ACM observed on site are included in Appendix A and thelaboratory anal5rtical reports are included in Appendix B. Recommendations Family Environmental recommends to have a certified asbestos abatement conFactor rcmove or abateall ACM identified prior to any demolition and or rcnovation activities that will impact the ACMidentified' There is approximately 12,000 to 14,000 sqFt of asbestos containing textured walls andceilings in the stain and 2d level. work safely and if you counter any other suspect material duringdemolition, have that material properly sampled and analyzed. 6.0 GEI\TERALCOMMENTS This asbestos inspection was conducted in a manner consistent with the level of care and skillordinarily exercised by members of the profession currently practicing under similar conditions in thesame locale' The results, findings, conclusions and r@ommendations expressed in this report are based on conditions observed during our inspection of the building. The information contained in thisreport is relevant to the date on which this inspection was perfomed, and should not be relied upon to reprcsent conditions at a later date. This report has been prepared on betralf of and exclusively for useb1'you for specific application to your project as discussed. This report is.not a bidding document. Contractors or consultants reviewing this report must draw their own conclusions regarding furtherinvestigation or remediation deemed necessary. Family Environmental does not warrant the work ofregulatory agencies' laboratories or other third parties supplying information which may have been used in the preparation of this repon- No warrant5r, express or impried is made. APPEIIDD(A ASDESTOS INSPECTION SAMPLEST]MMARY TABLEI SUMI{ARY OF ASBESTOS CONTAINING MATERIALS Number 'JA)F Description PLM Results sMwcl st25t06 Itrrtacmg material spray texture front entry riehtwall ND sM\y/c2 5n5n6 uufiacmg material spray texture east lldroom east wall ND sMwc3 5f25t06 uufiacmg malerial spray texture above landing ND @'"omsMw1c4s/25/06 Dunacng matenal spray texture above fueplace 2nd levelsMwcs5t25t06urfiacrng material mrav texhrre dinino qree ND NDsMlst2st06surtaqng material lower west bedroom west wall sM2 5n5/06 surtaong material lower west bedroom east wall ND NDSM3sn5rc6surtacmg material lower west bedroom ceiline sMwc2- I 5t25t06 Surfacingmateriffi wall ND sMwc2- 2 5t25tO6 Surfacingmateriffi interior wall ND sMw/c2- 3 5Ds/06 riuracrngmateriat Z'* level west side north wall interior room 4% Chrysotile TJI st25t06 -:-I ape Jotnt compound west kitchen counter NDTJ25/25t06 Japejoint compound end oFhal@6G level ND TJ3 5/25t06 Tape joint compouna loGffii bedrcom ND Extl 5n5to6 Tar wrap below wood siding NDEx€5D5t06 Tar v*'rap below wood siding NDExB5t25/06 Tar wrap Uelot" wood sidiiE ND ND- None Detected APPNNDD(B ASBESTOS LA,BORATORY AI{ALYTICAL REFORT lday 30,2006 Family Environmenral Compliance Senices, Iac.Attn: Sam tdolf 3650 Cberhdplace Denver, CO 30216 Rq FECSI / l40t Lions Ridge Coop - - LGN 0t3591 DearMr. Rolf Attached are the results ofpis'qpte na;;rs;ufr;.'.'tf;ffilXlltt#ffi#:c anassis @IM) ror a$estos conrained in the burk BuIk samlrtes are anal].^d in^acrcorthlce with usEPA test n€{hod EpwffirH-g3il 16, which requires thatostrnctly differientrnareriats.orlayeo pro"or*itnio. rlpf. U"r_l,J-* r#nt *.*.rr.ffi i:H::|"{ilffi *:,::rl;.rv:.p,*=-iffi pg.y."g*i"grayeis,sucrraspaintor*ffiffiffif**ffi* 'votuntary Iaboratory Accrecrechnorogy(Mrri.'o*-nilT"-"il",ii#trffil The analytical resrlts provide -":i"9",+ *'n"ni;r -d;*lrrffi;sl #t#oggtes actuailv submifred. rhis rwon isassociared with vou or vour o€€nizanb" 'rd. ,.fi ;*ffi"f,*T trffi;ffilgffi;;*triH#.ff lirffiI"ffrien to craim prdufi.ifrJJ'rrg g Ntrr.Ap or any-agenc-v orrhe u.s.Anarllicar;'-';;.'il;;'##"JJ1m:ff nrggm*]1ry;f, F;ff ilH; ANALYST I[*ra\e-LABOMTORY DIRECTORlktrq__Russell D. Cox snroag NVLAP LAB COOE 200.1.t8-0 3650 Chsstnuf_p_tace . Dsnver. ?nloradoge}l6Phons: 303-292-o079 ' r-., goi'>,gz-;;H"".' Fmait: FamirgEnviro@aor.com .iHfJ:il ;---.; AriarJrucar r4lorato"y St.., fnc. \:po.t of TetnesulnpLM BnIk Asbesros A""$dr-_ Page I of7 CLIENT/pROJECT:@ P-?Tlglil! coMIvIENTs:- A[ s€parabre Fr," orravers ( exr:enr,.;-r ,-ffi'tff,"H#. corpo'.it" uoiio, ffi-;'rfiH lffilt#) within rhe seme sampre are anaryzed ad A,natysr: i\*Albe.< Russell D. Cox Date:li126t2006 rarf.l,nalytical Laborato"y Sut .o rnc. Report of TetResult. plMSulkAsb€stsAnatJEis Page 2 of7 CUENT/pROJECT:% "zolssesGTffiRA- ffi ffi St#-Tffi;ny*mt#ffi ;'.gTJ ;..#tffi:) wirhin &e same umpre are anarped and Anaryst: lt*ft3-' Rrlssell D. Cox Date:l5126/2006 F'amitfl natytical Laborato"y S..t, Inc. Report of Test ResultspI,}I Bulk A$estos Anat5nis Page3 of7 CLIENT, PROJECT: FECST / 140i Lions Ridqe Looo &?Hffirffiroffi fl-gSb ptry.or l+en ( T.e!.p.y, ) wirhin the sasre sample are anarped andlli> l{on b"nilft.. __-.eo$re asbestos perceut is reported if 4|t-caUte. Analyst:\*NQ-- Russell D. Cox Date:0i126/2006 F'anilfinalyticat Laboratory S.r#." lo* Report of TestResulb PLIr{ BuIk AsbeSos Aralysis Page 5 of 7 CLIENT/ PROJEGT: FECSI/ 1401 Lions Ridoe Loop ADDfiONAL COMMENTS:. AII separable parts or lryen ! flcept paint ) njrhin fte sa.me sample arc anallzed andffi-:if; ,"siHH composite asb&oi pe.['; ;'.&;.d r qiuilur". Anaryst: lt-0)e"- Russell D. Cox Date:QS/26/2AA6 BamilvQnatytical Laboraro"v S*i? n*. Report of Test ResdtspLM BuIk A$esros Aut/sis Page 4 of7 CLIENT / PROJECT: FECST / 14O1 Uons Ridqe Loop ADDITIoNAL colvftElrr::j1-separable partsor tryers ( except paht ) Eithin the sane sample are amlyzed andffiiflr$;ffi. composite asbe*o' p"'bot i, n ionea uapiri'caure. Anar-v-st: [\..J[bg"- Russell D. Cox Date:ll126t2006 F'a mi tytlnalyticat La boraro.y S.rr?e ro *. Report of TestResultspIM EuIk Asbesos Atalysis Page 5 of Z CLIENT / PROJEGT: FECSI / 1401 Lions Ridoe Looo PROPERTIE #,'HHffi1rffi:fl-f-ry'.o* **.o'L."..s ( elcept paint ) Eithin rhe same sampre are aruryzed andNil= No* n t ffi. --*!o$te asb€stos percenr is reportea if A-pULOfe. Analyst: [..JEe",-- Russell D. Cox Date:05/2612006 Famiflnalyrical Laborarory su#q ro., Report of TestRstrIb PLI4 BuIk Asbe$6 Analysis Page 6 of7 % ASBESJOSTmLIBm ADDnoNAL GoN{IvIENTS:. AIl sepsrable pats or lryers ( exceptlninr ) withiu the same ,ompre are arulyzed andffiif".HHS.compositeasbiros-;ffi ;'A;r.cirairi'olIe. Anarysrt\JNe- Russell D. Cox Dxe:O5/26/2006 nannilylloatyricat Laborarorv s.*i? ro* Report of Test ResulbpLMBuIkA$estosArat ds PageT of7 CLIENT/ pROJECT: FECST/ 14Ol Ligns Ricroe Loop ADDHONAL colvs/mm:fl:tpt9]: ryry.* hvT { T..4paint ) wirrin the sa,oe saryre are anarped mdffiK:SlH conposite asbeso' p**t i, 6rt o roirii"ur.l "-- * rl Anaryst: il*Q$q- Russell D. Cox Date:l112612006 -t-or-f Uecrlptoh of Siteffocadon Sample& Special Inshrrcdons: Total Number of Samples:xeqEestedTunuroun* ('ry""flfiff'Ti*"; ReDnqdshed Eecdved Rel;'quished bi Date/Tlroe Datelllrne: Received by: Oiteiitme: Date/fime: uc\4Ap %ftp* AIHA pnrl . PFOFICIENT. LIONq Sample Descriptiou )i7 Day slu,l,,. pbonsB03-2r?f3r3t""*"r?:ar;-["fl H*erf,rf-vrro@aor.com TOWN OF VAILFIRE DEPARTMEN 75 S.FRONTAGEROAD VAIL, CO 81657 970479-2135 VAILFIRE DEPARTMENT AI.A.RM PERMIT lzf0l LIONS RIDGE LP VAIL llm1 UONSRIDGE LOOP 2to3t2202;m6 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES Job Address: location.....: Parcel No...: Project No : oe/L4/2006 09/L4/2O06 Phone: 970-409-9082 09/L4/2OO6 Phone: 970-949-4638 Permit #: Affi4081 Satus...: ISSLTED Applied. . : Wll4lzffi Issued. . : Wl20l20[6, Expires. .: O3llglzffJil s329.50 90.00 $329 ,50 s329 ,50 90.00 ((t-T oto-6(qt OWNER HART, RIEHARD I{. & ,JATIE Y. 1401 IJfONS RIDGE L@P VAIIJeo 8L657 A9PIJICAIIT SIIA}IER IJIT'E SAFETY DEBORAII IJ. SIIANER P.E. PO BOX r.073 FRTSeOco 80443 License: C000001971 CONTRACTOR THI'IJ EIjECTRO}IIC SYSTEMS P O BOX 534 AVON eo 81620 Iricense: L1-2 - S Desciption: niirnorn WIRELISS FIRE AI-ARM FOR DflSTING HOUSE Valuation: $2,600.00 aa*r**a**8i*,|.'8f{.*****a*t|ia***a**'f$***{.****a*{.a**a***.*..{t*{*E*{.*|f*.*FEEstJMMARY.{dn|'#.a**{.'aa*ta'!*'a8$**$* Electrical--- > DRB Fee__> Investigadon-- > wil csll_> TOTAL FEES-> $0. 00 $0.00 s0. 00 s0.00 $329. s0 Total CalculaEd Fees- > Additional Fees-> ToEl Permit Fe€-> BAI.ANCE DUE__> att{.€.r*,ltl.,lrr3tE,ir}t Ef.4*{4**{.*aa{.tia Approvals: Item: 05500 FIRE DEPARI!{EMf 09/L5/2OO6 DRhoades be t/gn = 1r Action: APPR Approved as noted. Scale on plans should Heat detectors are required under stairs, if accessible Etorage area existe, and aleoin any acceseible crawlspace(s) . CONDITIONS OF APPROVAL **i.{i8a*{.|*ict{6*a&a**&**{.'N.*aa*{t***s{.t*{.**s**'i{'**'**{d.{dd**{*|.{*{.*i4*t**'**{.tt**idt.{d'*{.a**a*&i**$** DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurat€ plot plan, and state that all the information as required is correct. I agfee to comply with the information and plot plan, to comply with all Town ordinances and stale laws, and to build this structure according to the towns zoning and zubdivision codes, design review approved, Intemational Building aud Residential Codes and other of the Town applicable thereto. REQIJESTTi FOR INSPECTION SHALL BE MADE TWENW-FOUR HOURS IN ADV v1rftrnoxr,rr479-2135 FRoNr B:00 AM - s mr. /.\- TO\ilNOFVAtr4 gtateaEFt &der: . .R96OO01tt9' Electloaiss / ct.rCs611 - -;1 1.1 . Perrdit, for 406-OEg1 -TlFpe::, ,.ef,laiFlif'' '.Thib :patmeat: '19r'90' AprucAnsrt lror BE AccEprED rF t*com-Er,lt'sgryIil oL - ,Jte /ffi\t ";;iln{,ffiit ffiil*o****,to*ffi/l rper.?sf, Fronrage Rd. -iiiiiiafon sulmmal anb m,iet iniuuoe imompfron fisGd-on thE Vail, Golorado O1OST'- ---- f oaqe oiiiilgto.m. Applisaflon wlll not bs acceptcd wlthout this FireAlarm Contmctor: Thrr\ Torvn of Va0 Reg. No.: t\2- s conHandPfpne#s: Hihr tle.rl 9{j ,tuat, E-MdlAddrss /\'. ^ ContraciorSlgnatrre: \ \ \)1v-A,- . - compuere vniualot{8 FOR Al-AR[ll PERltlT {Labor & Matertab) FirsAarm: S Zto0O. dnirrtar* Eao,le Corrnttr Assessotrs Offire at l8l0orvlbft ww for Pareel - Parcef # 3 rB?'t,l.(!iLOOlo Job Namo: \N\\\\a^.r Kesidm., ll '"0 *'*' \rlol U\or,rRtd\& "l.oo/, Vo.i \ Detailad Location of rsork: (i.€., foor, unlt #, Hdg. #) llrrYo^lns*^*r.nn rt# Detailed descripUon of rvork:-i]ilil"8"r"'^i^,-^ g-rn oisfl,. hs,.'." (n" "tltev *sJi\_-"r- '.rl.-_.-' Work0lms: Ner( ) Addltitn( ) Rernodel( ) R$air( ) Re*roffytr Ottt€r( ) Tf.fBldrr.Stgl"-bmi y( ) Multi'famtly( ) Comrercid( ) Resoaurant( ) other( ) No. of Exisling Owame Unne @vet-lNol **!s*&e&***&****!s*&***r1t*s*f *****8****FOR Omc€OltILYs*sffi l.r*tsffi !&s****{*********:b* rir_is'- _*'.,"'il*:* _2Hfr:*,HH:si** AETA{ENI tr \lVal@@ fr* E TOWNOFVAIL 75 S.FRONTAGEROAD VAIL, CO El6s7 97447y2t38 ELECTRICAL PERMIT Job Address: 12CI1 UONS RIDGE LP VAIL location.....: lzt01 UONSRIDCEIOOP Parcel No...: zl03l22:U2dl6 Froject No : omrER mRT, RICIIARD H. & ,I3SIE y. 09/06/2A06 1-401. IJIOI{S RIDGE IOOP 1IAII.co aL6s7 APPIJIEANT DA}TTCT ELE TRIC PO BOX 7246 BRECKEIqRIDGE co 40424 Lricenee: 114-E CO]UTR,ACTOR DAIiECI E&ECTRIC PO BOX 7245 BRECKM{RIDGE co 80424 Lricense:1L4-E *n**** oF coMMnNrrY uwtpwrvr NOTE: THIS PERMT MUST BE FOSTED ON JOBSITE AT ALL TIMFS Permit #: Effi{152 09/a6/2006 Phone: 970-390-LL73 a9/06/2006 Phonei 970-390-1173 ISST]ED wlMtxm wtL3t20n5 03trzt?Nl Desciption: CHANGEAND AD ORREWORKABOTI 80% OR ELECTRICALValuation: $0.00 SErare feen 2l0O t*'N*r.afir*{*rN'i**{*ffi r*r!ffifirr'r.{.***d'st***{r{.a*{"t'r**r}*rrr:}*a*{.**rr FEE sl.IMMARyElec,tricat- > DRB F€e___> Iwesdgalion- >wmcdl-> TOTAL FEES-> $90 .85 90. 00 90. o0 93.00 s93 . Bs s93.8s 90.00 s93 .8s s93 . S5 $0. oo Toml Cals ed Fe€s-> Addirloral Fe€s-> Toal Pernit Fee-->Payneds_-> BALANCE DT'E__>{d*{.4**'t'N!|{'rNf.{.S$ld*{ai.td#*&*at$*g{.***&lt'tar*8{4.t *t*r***F *aiAr!i*tot*&i*{dAt88**{.r. Approvals:Iten: 06000 EIJECIR.ICA! DEPARII'IENT 09/06/2006 SH .Action: .AP t*f{'qF*{r#*r{.*r****ifr,Fa&r'8tr;*{.t i*rN{*trFt't*t*rFit *tf{.${6r*t&td*8*{.***rN&.1iFit{*i#*i*a CONDMONS OF APPROVAL Cond: 12 (BLDG.): FIELII II'ISPECTIONS ARE REQIIIRED TO .'rrRCK FOR CODE COMPIJIAIiICE. rFrttt r*ri!{.itlt'F8{tt'Flf'a**'i{a'tLa{daa**8t*{.*i*t*{.**rrtttit$t N*{t{tr}t'i*Kdri$**trait{.t*t '!tf{#s.ald'{.i* DECU,RATIONS I hereby achowledge thut t nau" read this application, filled orr in full the information required, complelsd an accurate plot plan, and staie rhrt all the information as required is correct. I agree to comply with the informatisn and plot plan, to comply with all Town ordinanses and staie laws, and to build this snusmre accordiry to the 0ows zoning and subdivision codes, desip review alproved, Iaiernational Building and Residential Codes and other ordinances oftbe Town applicable thereto. RIQUF,SiIS FOR INSECTION SHAII BE I\,!ADE TWBTITY-FOI'R EOIIRS IN ADVANCE BY IELEPHONE AT 4792149 OR CTOR FOR HIMSELF AND OWNEF PM. o *'i.'f'S'i'ftl.'[!a*'tt******f 'a*'t't,*:*,t****'r**'i:*'F*'i'i*****'t**'r***tf*!Srr'r***'a'F*ra***rt*rt*****'r**tt*'t't**tirr**'s!r TOWNOFVAIL, COLORADO Statr,ne,nt **'i't*'l'********rl!**,!rt,l'*rt*'*t***********:l,t'a'f*'f'a*'f*'N*'f!f*'**{.1 *'****'f'*'*!f*'f'**'**'*r*!*********'**'irtt ra*t***'f'8 gtatenent Nr$ber: R06000144L Amount: $93.95 O9/t3/2OO6t1:1? Altl Palmeot Method: Check Irdt: LCNotation: #319g,/Danlcl ELectr:Lc Fermlt No: E06-01-52 Tlpe: EITEeXRICAII PERIqXT Parcel No: 2LO3-L22-O2.OO-6 Site Addrese: 1401 LTONS RIDGE IJP \TAIIJIJocatio[: 1401 IJIONSRIDGTE IJ@P TotaL FeeB: $93.85This Palment,: $93.85 Total AIfr Pmts: $93.F5 . Balance: $0.00*tttt'Nrltttt*t*'f$fX'iti'f i.tirr*i******rl***tt******aairtt tt tttSt'f*'tt$*'t:t*|l*'f**'Nr{r:t****t**l'i't*'i'i*tt,N*t*t rttN.rf ACCOI,JNTITEM LIST: Accou.o.t Code Descrlptlorl Current Pmts EP OO1OOOO31111OO SLEETRICAIJ PERMIT HEES WC OO1OOOO31128OO IEIJIJ CAI'IJ INSPECTION FEE 90 .85 3,00 -ffi75 S. Frontage Rd. Vail, Colorado 81657 AppucAnoN?LL Nor BE AccEprED rr rncoupl#on RJ06 "{t1/r- L A, e-n 3fril*rt"#AUe-(Ys '( ,;i'**it*t*"fr CONTRACTOR INFORMATION Electrica I Contractor: fiAtq gt-&f,ytaa T,u< Town ofVail Reg. No.;il+-a Contact Person and Phone #'s: 0Nt0 fhftl\ 970-190 - t 17 3 E-Mail Address:Faxf,: 54]-qL2- Contractor SigqOtt*F: -/ zr' COMPTETE SQ. FOOTAGE FOR AREA OF WORK AND VALUATION OF WORK (Labor & Materials) AMouNroF sQ rrrN srRUCruRE: 2t o0,5a Fr ELECIRICAL VALUATION: $o08 e Qontad Eagle C.ounty Assessorc Otrre at g7o-328-86tt0 or visit for Patrel # Parcel * 2t03 - lZzD- 2006 Job Name: wILl-,/fr/v\g "o/XtT'Ao^E Rt06L zoof Legal Description ll tot:Block:Filing:Subdivlsion: ownersNametfu Lwtu.tfttvls lAddress: /4At U06 fuA,4 MP Phone: Engineer:Address:Phone: Detailed description of work: C r-'+{o oK Ft'L'-orzK 8oo/o D€ ELg"<rucil WorkChss: New() Addition( ) RemodelQ{ Repair( ) TempPower( ) other( ) WorkType: Interior p() Exterior (2q) Both b(I Does an EHU exist at this location: Yes ( ) No K) Typeof Bldg.: Single-familyffi Duplex( ) Multi-family( ) Commercial ( ) Restaurant( ) Other( ) No. of Existing Dwelling Units in this building: /No. of Accommodation Units in this building: / Is this permit for a hot tub: Yes ( ) No (a()I l-E F ;e tr i',1 ;'fJ;nl l5 \z lq U Vi l- ,-', Does a Fire Alarm Exish Yes ( ) No ( ) ll Does a Flre Sprinkler l4em exist: Yes ( ) ryp $ ***************************************FOR OFFICE USE ONtY t/ I******** *+u/'/ ^41" I F:\Cde!AFORMS\PERMITS\BnildinS\decticalJ]ermit-ll-23-2005.DOC Page 1 of 2 LU25'n00/s o o ffiffi:''**a;1, I Amendment to the 2002 N.E.C. Town of Vail Ordinance 4. Series of 2005 Overhead services are not allowed in the Town of Vail. Underground services shallbe in conduit (PVC) from the utili| transformer to the electric meter, main disconnect switch, and to the first electrical distribution circuit breaker panel. The main disconnect switch shall be readily arcsible, andlocated next to the meter on the exterior wall of the structure. All underground conduits are required to be inspected before back-filling the trench. In multi-family dwelling units, no electrical wiring or feeder cables shall pass from one unit to another. Common walls and spaces are uempt NM Cabfe (Romex) an be ud only in single and multi-family dwellings net exceding 3 ston'ee. Type tlM annot be used in any building mixed with Type A,B.EEH,I,M AS oeupancies, Aluminum anductorc smaller than size #8 are not permitted with the Town of Vail. . TOWN OF VArL ELECTRTCAL PERMTT GUTDELTNES All installations of exterior hot tubs or spa's require a DRB approval from planning. This application will not be accepted without a copy of the DRB approval form attached (if applicable). If this permit is for installation of an exterior hot tub or spa on a new elevated platform or deck over 30" above grade, you must also obtain a building permit. If this permit is for installation of an exterior hot tub or spa on any existing deck or elevated platform, a structural engineer must review the existing condition and veriff that it will support the added concentrated load. Please provide a copy of the structural engineers wet stamped letter or drawing with this application. If this is a remodel in a multi-family building with a homeowners association, a letter of permission from the association is required. If this permit is for a commercial space, two (2) sets of stamped drawings are required. Electrical one-line and panel schedules are reguired if load is added or distribution is altered. I have read and understand the above. Signature Date Signed If you have any questions regarding the above information or have additional questions, pfease contact the Town of Vail Electrical Inspector aI97O-479-2L47. The inspector can be reached on Monday thru Friday mornings between the hours of 8am and 9am. You may also leave a voice mail and the inspector will call you back. F:\cdev\FORMS\PERMITS\ELilding\el ectica Ulermit_ 1 1 -23-2005. DOC Page 2 of 2 ttlz3l2005 TOWN OF VAIL 75 S. FRONTAGEROAD VAIL, CO 81657 970-479?138 Job Address: Location.....: Parcel No...: kgal Description: Project No : : ISSI.JED: 08/09/2006: 0811512006: 02l1ll200fl Status. . . Applied . . Issued. Expires . OWNER HART, RICHARD H. 140]. IJIONS RIDGE VAIIJco 81557 APPI'ICAI{I R & H MECHANICAI PO BOX 810 EAGIJE co 81631 L,icense: 184 -U EONTRACTOR R & H MECITANIEAL PO BOX 810 EAGI-,8 co 81631 I-,icense : 184 -M Desciption: ADD RADIANT HEAT Valuation: $8.500.00 Fireplace Information: Reshicted: Mechanical-- > Plan Check-- > Invesdgation- > will cdl--- > 08/09/2006 08/09/2006 Phone: 08/09/2006 Phone: & iIANE Y. LOOP I-rIJC (970) 328-2699 (970\ 328-2699 # of Gas Appliances: 0 # of Gas Inss: O # of Wood Peller 0t++*+*{.*{.+ti'**t:f*********'l**,.|i*******************t+**{.:}*tt*:l{.*{.**,.*+ LIJC 9228.00 Item: 05100 BUILDIIIG DEPARTMEIIT Oa/o9/2oo6 Js Act,ion: Ap CONDITION OF APPROVAL Cond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 22 (BLDG. ) : COMBUSTION AIR IS REQUIRED PER CHAPTER ? OF THE 2003 IMC AllD SECTION 304 OF THE 2OO3 IFGC AS MODIFIED BY TOWN OF VAIL. Cond: 23 (BLDG.): BOIII.ER TNSTALLATION MUST CONFORM TO MANUFAETI'RERIS INSTRUETTONS AND CIIAPTER 10 OF' TI{E 2OO3 TMC. Cond: 25 (BI"DG.): GAS APPIJIA}ICES SHAI.'L BE VEMTED Cond: 29 (BI,DG. ) : ACCESS TO MECIIA}IICAL EQIITPMENT IME AND CHAPTER 3 OF THE 2OO3 IFGC.. Cond: 31 $180 . 00 Reshrarant Plan Review- > $4s.00 ToTALFEES---------> $0.00 $3 .00 $0.00 Tolal Calculated Fees--> Additional Fees------> Total Permit Fee---------- > Paynents---------- > BALANCE DUE--------> AECORDING TO CHAPTER 5 OF THE 2OO3 IFGC. MUSf COMPI-,Y I'IITH CHAPTER 3 OF THE 2OO3 s228.00 s0.00 $228.00 $228.00 s0.00 Qrr*r*r*r oF coMMUNrrY DEV*PMENT NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MECHANICAL PERMIT Permit #: M06-0211 I4O1 LIONS RIDGE LP VAIL 1401 LIONSRIDGE LOOP 2103122U006'f RsoG -6 tc. \ (BLDG. ) : BOILERS SHALL BE MOIINIED ON FIJOORS OF NONCOMBUSTIBIJE CONST. I]NLESS rrsrED FoR MorrNrrNG or{ "o""tr"* FrJooRrNc. Cond: 32 (BLDG.): PERMIT,PIJA}IS A}ID CODE ANALYSIS MUST BE POSTED TNMEC}IANICAT ROOM PRIOR TO AN TNSPECTION REQI'EST. Cond: 30 (BI-,DG.): BOIL,ER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRi\fN OR OTHER APPROVED MEJANS FOR DISPOSING OF LIQUID }fASTE PER SECTION 1"004.6. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this stucture according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances ofthe Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOT,JR HOTJRS IN ADV PM. AT 479-2149 OR AT OIJR OFFICE FROM 8:00 AM - 4 OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNEI Aug, 3, 2006 '.11ii RU'ECHANICAL N0,8750 P. 2 qb.orQ Bulldlng Permit#: Mechanical Permit #: 97 0-479 -2149 (Inspecff ons) Permit witl not be accepred witnout ttreEfiowiffi f\o("-oztl 75 S. Frontage Rd. Vail, Colorado 8t 652 MECHANIOTL: $ $,fuA * Qfficp at 970-38-864O or yisit for Parrel , :tol*^*u|lh;*- Pto,tob Aftlffi luno,,rrh,,,, fu Lesat Desoiption ll rou {Bloclt;FilinE: 2-.'suaav,saoru"frt4$ fu&c_,WFqJggt* , \,'.ot.;d t Engfneer: e Address:Phone: y"-.*' .N;l , .** Boiler Location: IntarorQqf fxtenror 1 1 O*rer ( )DoesanEHUo<istat$islocationl yes( ) .No( ) TvpeofBldg:sLnglefamily( ) Dupre(( ) MuttFfamily( I c"mn"*'nt t I nrta"nnt( )odrer( ) . No, of Exlsting Dwelling Units in this building Is this a conveGion fror u - ++,t*,F:F,f *rf :|. **:fi ,F********* *FOR Aue, 3, 2006 9:48AM -ry t t t^ li:: erlc worhcheer No,8750 P, 3 Rl1-.99 R1F.o5Z Ftil0:.0i3 R2.8=.35'/ FLOORS AREA-RUmq l3 ot R VALUE {l u UA DT.qTU! REC ONTFI]T ,010 !t7,{ . 5o-o 1o'to57I CEILING l5t5 30 , o33 '10'( toa WALLS 3 Vby I Iq ,o57 170,3 fo"(6127 WINDOWS 4tz t, ,'Y .35'7 tl Z,l lo'tlVFq INFILTRATION Lfz6o I L5,y / r*o (3,1 x.75 tgf.y' / o.te Jo"lZr 9oI coryR^croRt hrW2ogvNt Ft14&S 5y ?tt I W* t3q Z"/"[u , co &tag tJ"o: 15 sgl PER[4IT* rQTALBrus: ?#T7 JoB r{AMe lilrwtp)5 Fur,_______:^, DEErrrr -tr- ' ,\- ",ra5F,- w, .tElt: ' L-l r tsJ ' Ca I t ,. 1 "L . a h? 1Fp s (iv 1'{ ,{ ll:rl ii' a.ll-IV I I\J rn t- +, P,4No, 875 03, 200 0,d0 IR&tt rvttctlnutcnAu -\-{J'ec^,. q* .h( \f I .L !^l tfi tF i, ( I TOWN OF VAIL 75 S. FRONTAGEROAD vArL, co 81657 970479-2t38 *n*rt"Nr oF coMMUNrrY o"utnrr*t NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MECHANICAL PERMIT PErMit #: MO6-0250 -B6i6_6(5-1 Job Address: 1401 LIONS RIDGE LP VAIL Status . . . : ISSUED Location.....: l40l LIONSRIDGE LOOP Applied . . : 09ll5l2ffi6 Parcel No...: 2lO3l22VN6 Issued . . : 0912012006 l,egal Description: ,<-\.i)..-F-tt-r ,A ( q \ Expires . .: O3l19l2C[7 Project No : '?RSoG -o tn \ owNER HART, RTCHARD H. & ,]ANE y. O9/a5/20O6 1401 IJIONS RIDGE IJOOP VAIIJco 8L6s7 APPLICANT SIITTON TNSIITTATING V{FST, INC .09/15/2006 phone: 970-945-1313 s398 CR 1s4 #1 GLENI,{OOD SPRINGS co 81601 License : 2I9 -Yl CONTRACTOR SUTTON TNSIIITATING WEST, INe. 09/15/2006 Phone: 970-945-1313 5398 CR l_54 #1- GLENWOOD SPRINGS co 81601_ License: 219-M Desciption: INSTALL GAS FIREPLACE WITH B-VENT FLUE Valuation: $5,950.00 Fireplace Information: Restrict€d: # of Gas Appliances: 0 # ofGas logs: 0 # of Wood Peller 0 ***dr**i(******1r**rl Mechanical-- > S120 . 00 Restuarant Plan Review-- > go . oo Total Calculated Fees-- > 9153 .00 Plan Check-- > $30 . 00 TOTAL FEES-----------> g1s3 . oo Additional Fees------> go .00Investigation-> $0.00 Toial Permit Fee------ > 5153.00wlrcau-----> g3.oo ilffffi;;;-::_:.._l *rii:ll ITem: O51OO BUII,DING DEPARTIT,IEI{:T O9/L5/2OO6 egunion Action: Ap CONDITION OF APPROVAL Cond: 12 (BI-,DG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPIJIANCE. Cond: 22 (BLDG. ) : COMBUSTION AIR IS REQUIRED PER CIIAPTER 7 OF THE 2003 IMC AtiID SECTION 304 OF TI{E 2OO3 IFGC AS MODIFIED BY TOWN OF VAII,. Cond: 23 (Br,DG.): BorrLER rNsrArJIJATroN MUsr coNFoRM To MANurAcruRER,s rNsrRucrroNs AND CHAPTER 10 OF THE 2OO3 IMC. Cond: 25 (BLDG.): GAS APPLIANCES SHAI-,L BE VEIITED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC. Cond: 29 (BLDG.): ACCESS TO MECI{ANICAL EQUIPMENT MUST COMPLYWITL CHAPTER 3 OF THE 2003 IMC AND CHAPTER 3 OF THE 2OO3 IFGC.. Cond: 31 (BI-,DG. ) : BOILERS SHALL BE MOIINfED ON FLOORS OF NONCOMBUSTIBLE CONST. ITNLESS IJrsrED FoR MottrvrrNc oN "o*"ilr"o' FrJooR'.rc. Cond: 32 (BL,DG. ) : PERMIT; PLANS AIID CODE AIIAIYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR TO A}I INSPECTION REQUEST. Cond: 30 (BI.,DG. ) : BOILER ROOMS SHALIJ BE EQIITPPPED WITH A FLOOR DRAIN OR OTHER APPROVED MEANS FOR DISPOSING OF I.,IQUID WASTE PER SECTION 1004.6. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances ofthe Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOIIR HOURS IN ADVANCE BY TELEPHONE AT 4?9-2149 OR AT oUR OFFICE FROM 8:00 AM - 4 PM, SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNET ********************,F*{.{.***+**{.*******+***+*************{.'{.+*+*++*++****!t******************** TOWNOFVAIL. COLORADO Statement **{.4.{.:1.************************{.*:************i.*********{.**+*d(**'t********* * * *** *******{.*{.**{.** Amounr: $25,00 09/2e/200672:36 PMInit: LTNotation: alerefi\t Lopes / ck Statement Number: R050001563 Paymerrt Method: Check 1"400 Permj.t No: M06-0250 Type: MECHANICAL PERMIT Parcel No: 2LO3-L22-0200-5 SiTE AddTESS: 140]- IJIONS RIDGE LP VAII' IJocation: l-401 LIONSRIDGE LOOP Total Fees: This Pavment:$2s.00 Total AI,t Pmts : Balance : i.** *+***,t***************:1.**+{.**{.*:}:t,s:}**{.****4.*****{.{. *************{.*{.*********.******i.******** $1s3.00 $1s3.00 $o. oo Current Pmts ACCOTINT ITEM LIST: Account Code MP 0 010 0 0 0311110 0 PF 00100003112300 Descript ion MECHANI CA! PERM]T FEES PI,AN CHECK FEES 20,00 5.00 Coo*rrrNr oF coMMUNrrY orutnrr*, NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MECHANICAL PERMIT PCrMit #: MO6-0250 Job Address: l40l LIONS RIDGE LP VAIL Location.....: l40l LIONSRIDGELOOP Parcel No...: 2lO3l22QZ006 OV\INER }IART, RICTIARD H. & irANE Y. O9/L5/2O05 1401 IJIONS RIDGE IJOOP co 816s7 Appr_,rcAl\n suTToN rNsttATrNG wEsT, INC.09/L5/2006 phone. 970-945-L3L3 s398 CR 154 #1 GLENWOOD SPRINGS co 81601_ License: 219 -M CoIVIRACTOR SIIITON INSTTJATING WEST, IITC. 09/L5/2006 phone: 97O-945-L3L3 5398 CR 1_54 #L GLENWOOD SPRINGS co 8t_601 I-,icense : 219 -M Desciption: INSTALL GAS FIREPLACE WITH B-VENT FLUE Valuation: $4-500.00 TOWN OF VAIL 75 S. FRONTAGEROAD VAIL, CO 81657 970-479-2138 lcgal Description: Project No : Plan Check--> Investigation-> Will Call---- > (Wb- oLlt $25.00 TOTALFEES--------> $0.00 93 .00 Fireplace Information: Restricted:,l:F*:i:t****:t*{<*+**r(******{<***t(*****t(****+*:*******'id.'it!:B**'****t rtr(+:f **:f :N* FEE SUMMARyMechanical--> S100.00 Resoarant Plan Review-> Status...: ISSUED Applied. . : 09ll5l2ffi6 Issued. . : 0912012006 Expires. .: 03ll9l2m7 # ofGas Appliances: 0 # ofcas Logs: 0 # of wood Peller 0 g0.00 Total Calculated Fees--> 5128 - 00 S128.00 AdditionalFees----------->$0. 00 Total Permit Fee-----> $r-2s.00 Payments----------- > $128.00 ***1t**i<*****************************x*xx***li:t:t*'t*)i'l*'!*++**:!:t*i.x:}:F+*+:|::}*:******+****** Item: 05100 BUILDING DEPARTMENT 09/L5/2OO6 cgunion Action: Ap CONDITION OF APPROVAL Corid : 12 (BL,DG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond:. 22 (BL,DG.): COMBUSTION AIR IS REQUIRED PER CHAPTER ? OF THE 2003 IMC AND SECTION 304 OF THE 2OO3 IFGC AS MODIFIED BY TOI{N OF VAIL. Cond: 23 (BI,DG.): BOIILER INSTALI.,ATION MUST CONFORM TO IVTANUFACTURER'S INSTRUCTIONS AI{D CHAPTER 10 OF THE 2OO3 IMC.. Cond: 25 (BLDG.): GAS APPI-,IAIiICES SI{AI-,L BE VEMTED ACCORDING TO CHAPTER 5 OF TI{E 2003 IFGC. Cond: 29 (BI-,DG. ) : ACCESS TO MECHANICAL EOUTPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003 IMC AND C}IAPTER 3 OF THE 2OO3 IFGC., Cond: 3l- (BI,DG.): BOILERS SIIALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. ITNLESS r,rsr'D FoR MorlNrrNG oN "o*"ailr"oE FLooRrNG. Cond:32 (BLDG.): PERMIT,PI,ANS AND CODE ANALYSIS MUST BE POSTED IN MECIANICAI-, ROOM PRIOR TO AN INSPECTION REQUEST. Cond: 30 (BL,,DG.): BOII-,ER ROOMS SHAITL BE EQUIPPPED WITII A FLOOR DRAIN OR OTIIER APPROVED MEANS FOR DISPOSING OF I-,IQUID WASTE PER SECTION ]-004.6. DECLARATIONS I hereby acknowledge that I have read this application, frlled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOT RS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4 PM- lLa14 -lr zs SIGNAT{'RE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNEF ,F,t* * * * * *,1,& * * ** * * * *+*****+* * * * * * *:** * * ******rt,N.*+**. *rr'**'*'**,t'!*****:t+********* * * *.* **'N.{.*** ir( * '}ik,r't'r* TOWNOFVAIL. COLORADO Statement :t,t *,1.r. * {. t {. * {. d.* !F * *,F * *+{.***** * * * **** * 't:t'}****t **'*********'}**** *********{.*****{. 'tt ** *******'ti *'t *{.** 't Statement Nuriber: R06000L48? Pa]rment Method: Check ck13 9 5 Amount: $128.00 09/20/2006L0:52 AMInit: I-rTNotation: ,feremy Lopez / Permit No: Parcel No: Site Address : Location: This Payment: MP 00L00003111100 PF 0010000311.2300 wc 00100003112800 2103-L22-0200-6 1.4 O 1 LIONS RIDGE LP VAIII 1401 LIONSRIDGE LOOP T]4)e: MECHANICAIJ PERMIT TotaL Fees: Total ALL Pmts : Balance : M06 - 025 0 $128.00 * * + + * * + * * + + + + + + + + + + * + * * * * * * * * * * * * * * * **********:*:* **:*:! * *:* * * * * * *********************+'f +******+ * ACCOUNTITEM LIST: Account Code Description s128.00 $r"2B. oo $0.00 Current Pmta MECHANICAL PERMIT FEES PI,AN CHECK FEES WILL CALI, INSPECTION FEE r_00.00 25.00 3 .00 0g/u/200$ '.^ # TIU 1$:08 m 6 002/003 i.,, -afl I0vtil fiot"-ozro Frcvide trleclranical Room Layout drawn b $c6le to intiludetE ]'/ted|5nics I Room Dimcndonso Gsmbus1:ion Air Duct Si4 and locadono Fluc, Vcnt end GaF Lr'n€ Sizs and locadono HeEt toEE Catcs.o EguipmentCut/SpecShe€t$ .tg Pennlt wlll.not be acepted without.the follovrring: nbudrwsz/t/fi| Lja\A ,&. Work class: tlew ( ) Addithn {Aterauon (Rcp6b( ) Odler( ) Does an EHU eodst Et this lo€Uon: Yes ( ) No ( )Boller Locohlon: Intcrior ( ) Etteriqr ( ) Ofier ( ) TypesfBldg: slngl*tunily(f/ Dude<( ) Muld+afiily( ) commercial{ ) R€#urant( ) Other( ) No. of ftistinE Dwelling Units in this buildinE: No/fype of Fiteplaoes Proposerl: Gas Appllancee ( ) Gas LoSs ( ) Wood/Pellet ( ) Wood Eumlng (NOT AILOWED) *ls***lG* *rfi *****tl.tl.tl.:fi :*:lE*rr:G+FoR :tF!B!GrF* ** **d(d6*{C {c *r|trf **!FtF*:F*+ir rrt75lzoosF:\ode\4FoRMs\Femlts\Eulldln fidrrnicglncrmiLll-23-Z005.Doc : i ft{ 0g/14/2006 TIU 16:08 FAI ++-r-Vail $/003000 TOWN OF VAIL 75 S.FRONTAGEROAD vArL, co 81657 9',1u479-2138 Job Address: Location.....: Parcel No...: Legal Description: Project No : Plumbing--- > PIau Check-- > tnvestigation- > Will Call---- > Permit #: Status, , . : Applied. . : Issued. . : Expires , .: Y. 08/04/2oo5 08/04/2006 Phone: 970-390-1138 08/04/2006 Phone: 9?0-390-1138 # ofGas Logs: 21 # of Wood Paller ?? P06-0081'3cc -o(s-1 ISSUED 08/04/2006 o8t07lzm6 wt03l2w7 # of Gas Appliances: ?? *r<:i********ra:*:trr,*:a:*:F:i****x*****+*t$'i,trt1.*++,a:Ft*:|+:l:a,*:f *:t:F!t:t:F+:f :t ++ra:|:*t+++ FEE suMMARy {**{**:f*rtiF**++r.+***{r*t rt*rr**tr*:tr,r.**ii**t********** ***+*+**+*+ * $50.00 Resnmrant Plan Review-> $1s.00 ToTALFEES-----------> s0 .00 $3.00 go. oo Total Calculated Fees-- > $?e. oo Aeuitional Fees------> Total ?ermit Fee------ > Paymefts---------- > BALANCE DIJE-.---- > $?8.00 $0.00 $?8.00 $78.00 $0. 00 Or*o*rrrNr oF coMMr.JNrry pevtp^aeNr NOTE: THIS PERMIT MUST BE POSTED ON IOBSITE AT ALL TIMES - PLUMBING PERMIT 1401 LIONS RIDGE LP VAIL I4Ol LIONSRIDGE LOOP 2103t2202M ?ffiac -ot"t\ OWNER HART, RICHARD H. & ,tAt{E ]-40]- LIONS RIDGE LOOP VAII-, co 81657 APPLICANT,I S & M MECHANICAII P.O. BOX 9338 AVON co 81620 License: 280-P CONTRACTOR J S & M MEEHANICAIJ P.O. BOX 9338 AVON co 8L620 License: 280-P Desciption: ROUGH IN LOWER LEVEL BATH Valuation: $3.500.00 Fireplace Information: Restricted: 't? IIEM: O51OO BUIIJDING DEPARTMEI\II oe/04/20o6 JS Acrion: Ap CONDITION OF APPROVAL Cond: 12 (BIrDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPI-,IAIiICE. DECLARA'TIONS I hereby acknowledge that I have read this application, filled out in frrll the information required, completed an accurate plot plan, and state that all the infotmation as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances ofthe Town applicable thereto. REQI,]ESTS FOR INSPECTION SHALL BE MADE TWENTY-FOIJ'R HOI]RS IN ADV PM. AT 479-2149 OR AT OI.JR OFFICE FROM 8:00 AM - 4 +********************1.**:t*******,*,t*'***************************'**********{r******{.************ TOWNOFVAIL. COLORADO Statement ************************t*****************,!******'S************************,t,t**:*!t********'f*** Amounr: $78.00 o8/07 /200603: s4 PM INiT : IJT Notat ion: JS&M Statement Number: R050001129 Palment Method: Check Mechanical / ck#3809 Permit No: Parcel No: Site Address : LocationI This Payment r PF 00100003112300 PP 00100003111100 wc 0 010 0 003112800 P06-0081 Ilrpe : PLIIMBING PERMIT 2LO3 -122 - 0200 - 6 14 01" IJIONS RIDGE IJP VAIL ].40T I.,IONSRIDGE IJOOP $78.00 Total Fees: ToEal ALL Pmta : Balance : $78.00 $78.00 $0.00********++++**:1.:tr,F'F+********,F**********.t **,t {.{.*******{.:N.***************:t ,t******+*{.**{.,t**{.**'t *** ACCOI]NT ITEM LIST: Account Code Deseription Currerrt PmLs PIrAN CHECK FEES PIJT]MBING PERMIT FEES WIIJII CAIJII INSPECTION FEE 15.00 50.00 3.00 AppLrcATrolrLL Nor BE AccEprED rF rNcoMpLtR Toa oo8( CONTRACTOR IN FORMATION Building Permit #: Plumbing Permit #: 970-479-2119 IJJ/VNOFYAIL 75 S. Frontage Rd, Vail, Colorado 81557 bw8( Plumbinq C.ontractor:efu,L/ Ad,^A-Town ofVail Reg. No.: ,4.n - P CoDtact and Phone #'s:/wt* -.- E// - /Sa E-MaL eddress:" /1b/?die^ U+)aaA . Contractor Signaturei 1 /_-,,"_*-,-,Y"-.-'".I-_ ..a rv6 COMPLETE VALUATION FOR PLUMBING PERMIT (Labor & Materiats) PLUMBING: $ Contact Assessrc Office at 970-328-8640 or visit for Parcel #Parcel# .1 /n..4 / ", "\ n .t \0O robNanet r4/?)t fuddu-c!.-)rob Address: l{Ot .fu'na'uzg et- Legal Description ll totl Block:Filing:Subdivision: owners Name:/trta il"m Addres*/ Eh/ -r{ /rut,c, 1, l*-,Phone: Engineer:Address:Phone: Detailed descriotion of work: flert ilo .rL-t l^,1 .A rluSv. Work Class: New ( )Addition t1) Alteration ( )Repair( ) Other( ) Type of Bldg.: Sinole-famillf ) Duplex ( ) MultFfamily ( ) Commercial ( ) Restaurant ( ) other( ) No. of Existing Dwelling Units in this building: /No. of Accommodation Units in this building: Is this a conversion from a wood burning fireplace to an EPA Phase II device? Yes ( ) No ( ) *******i******************{r************FOR OFFICE USE ONLY**r.****rr***************************** \Wail\data\cdev\FORMS\PERMITStfLMBPERM. DOC 18- 07D6n002 OFVAIL FRONTAGEROAD 87657 138 DEPARTMENT OF COMMUNITY DEVET,OPMENT NOTE: TI{IS PERMIT MUST BEPosTED oN J0BSITEAT ALL TIMES ADD/ALT ST,X. SI.n-D PERMIT Job Address: l,l01 UONS RIDGE Lp VAILlncation.....: 1401 UONSRIDGEI.oOf- Parcel No...: ZIU3L1ZV4(I|5 Permit #: 8064159 Project#PRI06{lgl Stafis. . Applied. I$sued . Expires - 06/2L/2006 05/2:../2006 phone: 97o-g45-9o9g ISSI]EI) Mlzrnmf ut2u2ffi 0Ut7t2w7 OIVNER mRT, RICEARD H. & irall8 Y.1401 IJTO}IS RIDGE IOOP VAIIJ co 81557 APPlrreelm WooDSTONE IIOMES, INC.P.O. BOX 3939 \TAII, co 81658 Iricense: 149_A colitTRAcTOR WOODSTONE HOMES, Ilrc.P.O. BOX 3939 VAIIJ co 81558 Lricense:149_A 05/2L/2O06 Phone: 970-845-9698 D&ription: REPIACE ROOF WII.H A_lo rR SHINGIJE, SrDINc, wnroows, ADD 4T{INDOITS/DOORS, NEIV KITCHE}I, NEIIO'iTR IJEVEL BATII. Ocorpancy: R-3ru Type Construction: V-B Valuarion: $60,000.m Revision Valuation: $0.00 Toal Sq Ft Added: 0 FEE SUMMARY r*r:.*r**trH...*ttftrffi**s*'t't*:.r*r*r*ar+tffi,F?|t ?*rifi$0.m Total Calqdsed Fcca->9t.00 Addirionat Fees_>$1,1$.69 Total Permit Fec-->Payarffi-;' EAL-ANCE DUE__> 9t.00 +}i**r*;rttat:rit*t|l *r****l'******|||?r*fr.|r**ar*B+t*{,*a.:FF|!i*+ Building-> S713.?5 Res$araDt plan Revicw_>Phr Cbeck-> W.%. n.cr"arim'p[__'-_;IDs€stiSntio!-> $0.00 TOTAL FEEi_>will chll-> s3.00 $1,180.59 $lz.m $1,305.69 $1.305.@ Approvals: Item: 05100 BttIIJDINc DEpARItt{Et{T o7/L9/2oO6 caunionpermit required prior toItEM: O54OO PI,A}II{I-ING DEPARIITBNT i . 06/23/2006 wirrsr asbestos abatementthe building permit. Actiou: issuaace Act,ion: ap of : 05500 FIRE DEPARII{ENro6/n/2a06 J,JR Action: Apalarm sygtem recormended.Fire sprinkler system recomended.: o5500 pItBIrIe WORKS Monitored fire section of this Documed for auy frat may ap,ply. .,,} \ ti,rt ' I ,o Ir i " ,{ Requested Inspect Date:' Inspec{ion Area: Site Address: ^ Type: B-ELEC uccuoanc,\/: & JANE Y.' Monday, December 18, 2006 1401 LIONS RIDGE LP VAIL 1401 LIONSRIDGE LOOP SubTgRe: ASFR A/P/D lnformation Requested InsDec.tion(s) Inspection Hlstorv Status: ISSUED Insp Area: SH 09:30 AM 970.390-1173 DGOLDEN K ilurl' AIRTIGHT RATED OR Phone: 970-390-1173 Phone: 970-390-1173 OR REWORK ABOUT 8OO/O OF ELECTRICAL (rPftuItem: 140 ELEC'llidC I estor: DANICI ELECTRICRequestor: DANICI ELECTRICCoriments: reinspect, will call 390-1 173 Assioned To: SHAHN- Action: Time Exp: Requested Time:' Phone: Entered By: ]tfu*I $*u Item Item Item Item Item 110 ELEC-Service 120 ELEC-Rouoh o9D2tO6 | Gomment: 130 ELEC-Conduit 140 ELEC-Misc. 190 ELEC-Final REPT131 Run Id:. 6L42 I?frTloou lnspec$LT Fe,{luFql R.eporting eage go Requested Inspect Date: f[ursday, December 21, 2006 Inspection Area: CG Site Address: 1401 LIONS RIDGE LP VAIL 1401 LIONSRIDGE LOOP A/P/D Information Activitv: 806-0159 Const Tvp6:Orrier: HART. RlApolicant WOODSI Cohtractor: WOODS] Description: BEP-|=A_Q! A-BUILD SubTvoe: ASFRUbe: V-B Status: ISSUED Insp Area: CG PUBLIC WORKS AND FIRE. JSUTHER ACM AREAS ARE DISTURBED. - JSUTHER Reouested Time: 10:00 AM' Phone: 970-845-9698 Entered By: JMONDMGON K The front door Comment: Comment: Requested Inspection(s) Item: Requestor: Coniments: Assioned To:- Action: Comment: Action: CR CORRECTION REOUIRED ING AND SIDE OF BOTH FIREPLACE TO MAINTAIN REOUIRED Action: AP APPROVED WESTWINDOW. Action: COND APPROVED/CONDITIONS I BARRIER ON EAST FIREPLACE RIGHT SIDE. Action: AP APPROVED : DN DENIED MECH REPTl31 Run Id: 6154 +:27 om vait co'- ciiy 6i - Requested lnsp.ect Date: fri.day, December'15, 2006 Insoection Area: SH Site Addrss: 1401 LIONS RIDGE LP VAIL 1401 LIONSRIDGE LOOP A/P/D Informatlon Tvoe: B-ELEC SubTvoe: ASFR Status: ISSUEDOccup_ahby: O'se: Insp Area: SH & JANE Y.' Phone: 970-390-1173Phone: 970-390-1173 OR REWORK ABOUT 80% OF ELECTRICAL Requested Tlme: 11 :30 AM' Phone: 970-390-1173 Entered By: DGOLDEN K Reouested Inspection(s) Insoectlon History Item: 1 10 ELEC-ServiceItem: 120 ELEC-Rouoh 0st22t06 | Comment: ( Item: 130 ELEC-ConduitItem: 140 ELEC-Misc.Item: 190 ELEC-Final Time Exp: -\-\.-f rJ-*-- | ? 7 ;-(zoLl &,/rno/o fi2yru{ra4 DITIONS BE AIR TIGHT RATED OR Item: 190 ELEGFlnal Reeuestor: DANICI ELECTRIC Assisned To: "rolh fZ Run Id: 6L28 1110-2006 Inspectio.l RequFqt Reporting page 3+ Request€d Inspect Date: Thursday, December 21, 2006' Inspection Area: CG Slte Address: 1401 LIONS RIDGE LP VAIL 1401 LIONSRIDGE LOOP A/P/D Information Reouested Inspection(s) Item: 390 MECH.Flnal B-MECH Sub TgOe: ASFR Status: ISSUED lnso Area: CG Phone: (970)328-2699 Phone: (970) 328-2699 REOUIRED Requestor: Coniments: Assiqned To:- Action: Comment: Requested Time: 11:00 AM- Phone: Entered By: JMONDRAGON K lnspection Historv Item: 200 MECH-Rowh * Aooroved * 0Sn1t06 Inspector: SHAHN Action: APAPPROVEDcommenL l[sf_E_cJED; F_O-!L_EB DV, LOWERBAIH,I(LCIrEN VEN_T]D-U^CT ROUND DUCT TNSTALLED, UPPER BATH TO REMAIN UNCHANGED DUE TO ASBESTOS. 5t, tt Yxl'z--Q"' 5-d^^ \^-A- "l'+b *'-V''* * ADDroved * JRM " Action: APAPPROVED HEAT APPROVED l OO # AIR TEST Item: 310 Item:315Item: 390 REPTI-31 Run Id: 6154 12-20-2006 Inspection Request Reporting Page 41 +:23 om vait_ co'- cify ol - Requested Insp€ct Date: I[ursday, December 21, 2006 Inspeition Area: CG Site Address: 1401 LIONS RIDGE LP VAIL 1401 LIONSRIDGE LOOP A/P/D Informatlon ^ Type: B-PLMB uccuoancv: t JANE Y.' BATH SubTgne: ASFR Phone: 970-39G1138 Phone: 970-390-1138 Requestod Insoection{B) Item: 290 PLMB-Final Reouestor: Coniments: WILL CALL 914-5045 Assioned To: JMONDMGON <1- Action: 1) a,,9q- *-- Time Exo: ) ? Comment: APPRQVEIIKIICHEN AND 1 BATH GRFONIY (TCO) +"-v r ,.! Comment: 09/26/06 Item: Item: 230 PL 240 PL * Approved ** shahn " E ON 5# AIR TEST. Action: AP APPROVED Item: 290 Ldr-n-) Y./- fr<,u) Lov-or 'D Inspectlon Hlstorv Item: 210 PLMB-Underoround 08/09/06'lnsoector: JRM CommentItem: 220 PLMB-Rouqh/D.W.V.MB-Rouoh/D.W.V. 09/21l05 lnsoect, Commenl HARD PIPE ON 5# AIR TEST. PLMB-Final 12119106 Inspector: JRM Action: PA PARTIAL APPROVALComment APPROVED KITCHEN AND 1 BATH GRP ONLY (TCO) Requested Time: 1l:30 AM Entered By: JMONDMGON K Status: ISSUED Insp Area: CG REPT131 Run Id! 5154 Prcject ltlame: Hart residence Project Deecription: Perticipants: VAIL CO 81657 License: prciect Addtcss, t#t?lorc RIDGE tp vAIL-.\ lrOal Deccrlption: lot: a Bbck{subdlvblon: UON'S RIDGE FIL. 2 Psrccl Number: 210312202006 Comments: Repaint, replace siding and deck rails - same for same, Design Review Board ACTION FORM Departnent of Community Devdopment 75 South frontage Road, VaiL C-olorado 81657 tef : 970.479.2139 fax: 970.479.2452 web: www,ci.vail.co.us DRB Number: DR8010258 location: APPLICANT HARI RICHARD H. & JANE Y, 08/20/2001 Phone: 328-6373x20 1401 LIONS RIDGE LOOP VAIL CO 81657 License: OWNER HART, RICHARD H. &JANEY. 08/20/2001 Phone: 1.101 UONS RIDGE LOOP Motlon By: Second By: Vote: Gonditions: BOARD/STAFF ACTIOT{ ACtiON! STAFFAPR Date of Approval: 08/20/2001 Cond: 8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate rwiew committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building. Please consult with Town of Vail Building personnel prior to construction activities. Cond: CONffi04956 That the railings be a minimum of 36" tall and the picket spacing be no more than 4' Planner: Judy Rodriguez DRB Fee Paid: 320.00 mwm General Information: Application for Design Review Departrnent of Community Development 75 South Frontage Road, Vail, Colorado 81657 tel: 970.48.2L39 fax: 970.479.2452 web: wurw.ci.vail.co.16 This. application. b -fur any project requirirq Design Review apptoval. Any project requiring design re\riew mustreceive apprcval prior b submitting a builcling p,ermit application. please refui m ine suohittal requirements for theparticular approval that is requested. An application'for Design Reriew cannot be accepted until all requiredinformation is rec€ived by the_Community Derelopment Department. The project may also need b be rwiewid bythe Town council and/or the Planning and Environnental dommission. olsiln neview Board approvat lapsesunless a building permit is issued and construction commencelr within one year of the approval. ptionoftheReque-st H"*" P.,IL ( {rt t,.,t). PhysicalAdd Location of the Propcal:Lot: ? Btock: Lness: 9tt (Contact Eagle Co. Assessor at 970-328-8540 for parcel no.) Owner(s) Signature(s): Name of Applicant: Mailing Address: >7 9y 2O Name(s) of Orner(s): Mailing Address: Type of Review and Fee: E New Constructiontr Addition \ Minor Alteration tr Changes to Approved Plans $20 $200 $s0 $20 Phone: {8E For corEfuqtion of a new building or derno/rcbuild. For an addition where square botage is added b any residential or commercial building (irrludes 250 additions & interior conversiors). For minor changes to buildings and . site improvements, such as, remofing, painting, window additiohs, landscaping, fences and retaining walls, etc. For revisions to phns already apprwed by Planning Staff or the Design Review Eoard PLEASE SUBMITTHIS APPUCATION, ALL SUBMmAL REQTJTREMENTS AND THE FEE TO THE DEPARTMENT OF COMMUNITY DEVELOPMENT. 75 SOUTH FRONTAGE ROAD, VAIL, COLOMDO 81657. T0l,fNffi Questions? Call the Planning Staff at 479-2138 MINOR EXTERIOR ALTERATIONS TO BUILDINGS AND SITE IMPROVEMENTS SUBMITTAL REQUIREMENTS General Information: This application is required for proposals involving minor exterior alterations and/or site improvements. Proposals to add landscaping do not require DRB approval unless they involve the addition of patios, water features, grading, or the addition of retaining walls. I. SUBMITTAL REOUIREMENTS o Stamped topographic survey*, if applicableo Photos or plans which clearly convey existing conditions*n Photos or plans which clearly convey the proposed building or site alteration(s)*o All relevant specifications for,the proposal including colors and materials to be used.D Lighting Plan* and Cut-sheet(s) for proposed fixtures, if applicabletr Written approval from a condominium association or joint owner, if applicabfea The Administrator and/or DRB may require the submission of additional plans. drawinqs. specifications. samoles and other materials (including a model) if deemed necessary !o determine whether a project will comply with Design Guidelines or if the intent of the proposal is not clearly indicated. Please submit three (3) copies of the materials noted with an asterisk (*). II. REPAINT PROPOSALS For all proposals to repaint existing buildings, the following supplemental information is required: I Color chip or color sample including the manufucturer name and color number(s)o Architectural elevation drawings which clearly indicate the location of proposed colors (ie. siding, stucco, window trim, doors, fascia, soffits, etc,) The following is an example: o Buildino Materials LIST OF PROPOSED MATERIAU' Tvoe of Material Color Roof Siding Other Wall Materials Fascia Soffits Wndows WindowTrim Doors DoorTrim Hand or Deck Rails Flues Flashing Chimneys Trash Enclosures Greenhouses Refdining Walls Exterior Lighting Other Notes: Please speciff the manufacturer's color and number and attach a color chip. All exterior lighting must meet the Town's regulations regarding lighting (see Tltle 14 - Development Standards). If exterior lighting is proposed, please indicate the number offixtures and locations on a separate lighting plan. Identiff each fixture type and provide the height above grade, lumens output, luminous area, and attach a cutsheet ofthe light fixtures. I PROPOSED I.ANDSCAPIN Botanical Name Common Name OuantiW Size PROPOSED TREES AND SHRUBS EfiSTING TREES TO BE REMOVED Minimum Requirements for Landscaping: Deciduous Trees - 2" Caliper Coniferous Trees - 6' in height Shrubs - 5 Gal. Tvpe Souare Foolaoe GROUND COVER soD SEED IRRIGATION TYPE OF EROSION CONTROL Please speciff other landscape features (i.e. retaining walls, fences, swimrning pools, etc.) o UTIUTY LOCATION VERIFICATION This form is to veriry Service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling installations. The location and availability of utilities, whether they are main trunk lines or proposed lines, must be approved and verified by the ' following utilities for the accompanying site plan. Authorized Sionature Date QWEST 970.384.0238 (Et) 97038a.0257 (fax) Contact: Jason Sharp PUBUC SERVICE HIGH PRESSURE GAS 970.458.2s28 (tel) Contact: Bruce Miller HOLY CROSS ELECTRIC ASSOC. 970.949,s892 (tel) 970.949.a566 (fax) Contact: Ted Huslcf EXCEL ENERGY 303.571.7518 (tel) 343.57I.7877 (tax) Contact: Paul Kellogg EAGLE RIVER WATER & SANIIATION DISTRICT* 970.476.7480 (tel) 970.476.4089 (fax) Contact: Fred Haslee AT&T BROADBAND 970.949.1224 x 112 (tel) 970.949.9138 (fax) Contact: Floyd Salazar *Please provide a site plan, floor plan, and elevations when obtaining approval from the Eagle River Water & Sanitation Dlskict. Fire flow needs must be addressed. NOTES: 1. If the utility verification form has signatures from each of the utility companies, and no comments are made directly on the form, the Town will presume that there are no problems and the development can proceed. 2. lf a utility company has concerns with the proposed construction, the utility representative shall note directly on the utility verification form that there is a problem which needs to be resolved. The issue should then be detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the utility company and the applicant to resolve identified. problems. 3. These verificaUons do not relieve the contractor of the responsibili$ to obtain a Public Way Permit from the Department of Public Works at the Town of Vail. Utlitv locations must be obtained before digoing in any public right-of-way or easement within the Town of Vail. A buildino permit is not a Public Wav oermit and must be obbined seoantely, NOTES TOALLAPPUCAI{Ts Pre-aoolication Meetinq A pre-application meeting with Town of Vail staff is encouraged. The purpose of a pre-application meeting. is to identifr any critical issues perhining to the applicant's proposal and to determine the appropriate development review process for an application. In many casesr the pre-applicagon meeting helps to o<pedite the development review process as critical issues are identified and dealt with in th6preliminary stages, A pre-application meeting may be scheduled by contacting Judy Rodriguez at 97 0.479.2128 or irodriouez@ci.vail.cQ. us Time Reouirements The Design Review Board meeb on the lst and 3rd Wednesdap of each month. A complete application form and all accompanying material must be accepted by the Community Development departmint prior to application deadlines. A schedule of DRB meetings and associated application deadlines may be found on the World Wide Web at http://ci.vail.co--us/cqmfndevlolanning/d.r!/imeetinosld.gfau_lt.htm For a new residential development the application deadline is Wpically 3.5 weela prior to a Design Review Board hearing. Review Criteria The proposal will be reviewed for compliance with the Design Guidelines as set forth in Title 12, Chapter 11 (DesiSn Review) and Title 14 (Development Standards) of the Municipal Code. Reouirements for orooerties located in hazard areas If a property is located in or adjacent to a mapped hazard area (i.e. snow avalanche, rocKall, debris flow, floodplain, wetland, poor soils, etc.), the Community Development Department may require a sits€pecific geological investigation. If a site-specific Aeological investigation determines that the subject property is located in a geologically sensiUve area, the property owner(s) must sign an affidavit recognizing the hazard report prior to the issuance of a building permit. Applicanb are strongly encouraged to consult with Community Development staff prior to submitting a DRB application to determine the relationship of the property to all mapped hazards. Reouired Plan Sheet Format For all surveys, site plans, landscape plans and other site improvement plans, all of the following must be shown. 1. Plan sheet size must be 24'l 36". For large projects, larger plan size may be allowed.2. Scale. The minimurn scale is 1"=20'. All ptans rnust be at the same scale.3. Graphic bar scale.4. North arrow. 5. Title block, project name, project address and legal decription.6. Indication of plan preparer, address and phone number,7. Dates of original plan preparation and all revision dates.L Vicinity map or location map at a scale of 1"=1,000' or larger.9. Sheet labels and numbers. 10. A border with a minimum left side margin of 1.5", 11, Names ofall adjacent roadways. 12. Plan legend. o Desion Review Board Meetins Reauirefients For new construction and additions, the applicant must stake and tape the project site to indicateproqeB lines, pmposed buildings and building corners, All trees to be removed must be taped. Th; applicant must ensure that staking done during the winter is not buried by snow. All site tapings andstaking must be completed prior to the day of the DRB meeUng. Applicants who fail b appear before the Design Review Board on their scheduled meeung date and who have not asked in advance that discussion on their item be postponed, will have their items remored from the DRB agenda until such time as the item has been republished. lf the DRB approves the application with condiUons or modificationt all condiuons of approval must be resolved prior to the issuance of a building permit. Staff Aooroval The Administrator (a member of the planning staff) may rs,riew and approve Design Review applicaUons, approve with ceftain modifications, deny the application, or refer the application to the Design Re/iew Board for a decision, All staff approvals are reviewed by the Design Rsriew Board and any staff decision is subject to final approval by the DRB. Additional Review and Fees If this application requires a separate review by any local, sbte or Federal agency other than the Town of Vail, the application fee shall be increased by $200.00. Examples of such review, may include, but are'not limited to: Colorado Department of Highway Access Permits, Army Corps of Engineerc 404, etc. The applicant shall be responsible for paying any publishing fees in excess of 50o/o of the application fee, ff, at the applicant's request, any matter is postponed for hearing, causing the matter to be re-published, ften the entire fee for such re-publication shall be paid by the applicant. Applications deemed by the Community Development Department to have design, land use or other issues, which may have a significant impact on the community, may require review by extemal consultants in addition to Town staff. Should a detennination be made by Town staff that an external consultant is needed, the Community Development Department may hire the consultant. The Department shall estimate the amount of money necessary to pay the consultant and this amount shall be forwarded to the Town by the applicant at the time of filing an application. The applicant shall pay expenses incurred by the Town in e<cess of the amount forwarded by the application to the Town within 30 days of notification by the Town. Any o<cess funds will be returned to the applicant upon review completion. T(}l{,H I, (print name)_ IOINT PROPERTY OWNER WRITTEN APPROVAL LETTER a a joint owner of property located at (address/legal description) provide this letter as written approval of the plans dated been submitted to the Town of Vail Community Development Department for the proposed improvements to be completed at the address noted above. I understand that the proposed improvements include: I futher understand that minor modifications may be made to the plans over the course of the review process to ensure compliance with the Town's applicible codes and regulations. (Signature)(Date) which have ?o €.rt )-".-- tr*) ltt DecL x3/r' Izt" ( r Door DF^\ r^*4t 'T 0"nI ,;. I N"t^ aP^t" I a*^c.L r N.- D*n ;ll L,.,* g(.rdlt.., /"", 5l.tt 9cet,.rcc0 4?%'rr^ fivtJti fc.**- r.,r-/.:rr,.o-L, ;. n, LL t aa-*n^ 'Caryaa,t^ To N>Rru €ft1*. rl |*ous 17 ft,,.". -l* wu} q^"^ bl^,:t crrr o(C {f ee,,t I I l- rn LL' \+5 f^0p^[uezSti,n *T n*ry frv'*,oo'Qfuw z,- Ad- WL^fuf,oe-s*^, 3b, y ,f"F,eJrre- r nto q-z&'-ftLI-L \rVa.,-A '|*'l' f +*+**tt+*'1.'1.ri**rt:1.+rt{r+*++*'t********'*'}**t:t*,t ** +t{.i ***:t **:***,*t {.!r**,},} ++,t**++ ++++ +++++ ++**i**** TOWNOFVATL, COLORADO SIStEglflt****'*'i'****t*+**+++*'!***'t'i***,t *'f,!t*+********+,r*+**+*+****+***'i{r*+*******'}*****:t*'t*rt *,},****,***:*** statement Nuniber: R000001252 Amount: g20.oo as/2o/2oo]:-o:59 AM Payment l,lethod: Check Init : JAR Notation: 6421 PermiC No: DRB01OZ6B Type: DRB - t4inor Alteration Pareel No: 2L03122OZOO6 Site Addreee: 1-7 43 IJIONS RfDGE Lp VAIIr L,ocatlon : Total Fees: $20.00Thio Payment: $20.00 Total ALL, pmtE: $20.00 Bal"ance: $0.00 + +***,1.:i'lt* ++ + + * **** ** +'t* r.+*'t * * 'rr *r*** * '*{r * +*.* + +** **** +**** ** * **** ** * *!**r}* * **,t ** {r'}r},}* ***** **** *,*,* ACCOIJNT ITEM LIST: Account Code Oescription Current pmts DR O()1()OOO31i22OO DESIGN REVIEW FEES 20. 00 I a) Design Review Action Form TOWN OF VAIL hoject Name: Hart Residence Project Description: Addition of parking space Owner, Address and Phone: Richard Hart, 1401 Lions Ridge Loop, Vailn CO 81657 Architect/Contact, Address and Phone: Project Street Address: 1401 Lions Ridge Loop Legal Description: Lot 4, Lions Ridge #2 Parcel Number: Comments: Project#: BuildingName: Motion by: Seconded by: Vote: Conditions: Town Planner: Brent Wilson Date: 8/30199 FTEVERYONE\DRB\APPROVAIggVIART.WPD Board / Staff Action Action: Staff Approved DRB Fee Pre-Paid: nla t6Yis.a 8/17 /94 DESIGN REVIEW BOARD APPIJICAUON ' TOI|N OF VAIIT, COLORADO DATE RECETVED: DATE OF DRB MEETING:********** INCOMPL'ETB APPLICATIONS MAv NOr BE SCEEDUII,ED FOR REVIEW. I. A. ********** FROJECT INFORUAITION: DESCRIPTION: B.TYPE OF REVIEW: New ConsbrucLion ($200.00) Addition ($50.00) Minor Alteration ($20.00) ConcepLual Review ($0) ADDRESS, l4 0 t Llont{tr>ce (ao( I,EGAI,, DESCRIPTION: IJOT Block Subdivision Lto G* D. E. F. H. I. J. If properby is described bydescription, please provideto this application. a meets and bounds on a separat,e sheet lega1 and atlach ZONING: NAI\4E OF Mailinq APPLICANT: Address: Phone NAME OFuailing APPLI,CANT I S REPRESENTAT Address: OWNER(S) SIGNATTIRE: \ t/ ,c-vw<-uloilz- *k^fMailing Address: Phone APPLI,CATTONS WIIJIJ NOT BE PROCESSED WITHOTE O'{NEN ' S STGIiIAr(TNE Condominium Approval if applicable. DRB FEE: DRB fees, as shown above, are to be paid at the time of submittal of the oRn application. taEer, when applying for a building permit, please identify the accuratevaluaLion of Lhe proposal . The Town of Vail will adjusL thefee according to the t.able below, to ensure the correct feeis paid. fEE PAID: $CHECK #: DATE:. BY: NAME OF OWNER(S): FEE SCHEDULE: VAIJUATION $ 0 $ 10,000 ,i.'!.\.,\.iD fU. UUJ. . iD JU, UUU $50,001 -$ 150,000 91s0,001 - $ soo,000 $500,001 - $1.000.000$ Over $1,000,000 DESIGN REVIEIT BOARD APPROVAIJ E:IIPIRES APPROVAIJ UNIJESS A BUIITDING PERIIfT IS IS STARTED. FEE $ 20.00 $ 50.00 $100. 00 $200. 00 $400.00 $500.00 ONE YE,M AFTER FINAT ISSUED ATID CONSTRUCTION (Jl;,rtu {tP* Richard H. Hart 1401 Lion's Ridge Loop Vail , colorado S165? Septenber 22, 1995 Solar Crest Assosiation 14OO Lions Ridge IoopVail, Colorado 8L657 Ladies and Gentlemen: Re: Lions Ridge Loop cul-de-sac I thcught it would be useful for ne to state invriting the history of ny position about the cul-de-sac atthe east end of our property, Lot 4 Lions RidgeSubdivision, Filing No, 2. f bel-ieve Jane concurs. For years we have been concerned at the unsightly appearance of the cul-de-sac, its random unauthorized usefor vehicle parking and the trash and apparently innobilevehicles that from time to time accumulate. We trave overthe years expressed those concerns to neighbors including oqtners at Solar Crest and pat Dauphanais. At our reguestin past years Pat placed rocks in the eul-de-sac to blockits use for long periods. At our request they have largely been removed. f'or years we have extrrressed a uillingness to discuss use of that property for parking by Solar Crest owners ifit could be done in an aesthetic nay. No proposal has ever been suggested. I'rom our point of view the most aesthetic use of theproperty is its restoratLon to natural contours, acknouledging the road. This must be obvious. With this background, on or about September 9 Mike Letourneau inforned ne that Pat was dunping fill on thecul-de-sac. I had not seen this. I told hin that Pat had no specific authority to do that, that we were willing todiscuss whatever Solar Crest wished to present but I didnot offer to stop Pat. Over the next day or so Pat continued fill sork and I repeated to Uike our willingness to listen. On Septenber l.B the president of the associationcalled. She asked if I would be willing to talk tocoumunity developnent peopte about the issue. t said thatwould be fine. No contact rras made from the town to me on Septenber19 and as the day wore on it hj_t me that she must haveexpected ne to call conmunity development to put a haLt toPat's nork. That had not been what I originally thoughtshe wanted and expected me to do, so I began to sketch outthie letter. Also, on Septenber 19 pat told me that the townreported that the Harts objected to his fiII work. Heasked us to sign an application reflecting our consent.Jane did so. My position remains the same as it has been ever sincethe issue was first presented. ff Solar Crest wishessomething of us I will listen. Pat has, however, somevhat taken the bit in his teeth.He is doing fill, regrading and reseeding operations whichfrankly please us. It makes no sense for us to ask pat tostop something of which we approve to await a neverforthcoming proposal . practically, his work probably nakesit Less likeLy for me to respond favorably to any proposalfor parking on our property which Solar ciest mayeventually make. Sincerelv. &puw Richard H. Hartcc: Mike Letourneau Pat Dauphanais l \b W H\l c8d!F s o' s \ ffi 3E =trlqF(toq\E Riil: o*h.TJ[" Wr'nyt l40f .,: 175 l4 t607 Go?o 3ot o oo 3 3ct / ooza{Eco{6z.F FT { t t a= -: J @m-n t-Tm { rm{ma- !; 1 6g, z 1llo"ll 1'mI -t trtrtr BIEIg EE" Ifi l=trnE 'Tt !or z= 22!o z aP-{m l* IF lffi o'n !m! ={ -.{o E mxml,{ oz Lo @9-{m e(ptse 0?ts 7 2^ Ei -t 8= ='d*;62. Y> \J -o z. a- 3= 1Z(Jc)7 -d? !e6n-{oo>iD t- o zAlmvz>mC)n-t>o|-I a T =m -l o =zm -l (I'z =IT p a) 9,T a,-tf+ oo- r+ o = z-3Bc)> t-o{ ls I I @t- r I I F =c, F- o rd IBI'ls I I I I I {mt-m tito l€ lz let<t> IF n { €z .tl Pt-!mo zo 'n 3 Hlo l€F lo l-rlt<t> ||-t- tm lo lz lo L -n l{to t=z o'n t> Fl! lmp ..1 mt- |TI t-lto t=z oI F m ozro _n roE - .A c)io U'cf5c ct o l = m o = Br F z m Es$g$ fi 3;fr3 Ei:B+ ':=:-E 3I=308do * 'tt o fc693 PA 3€= €E*iH gFSE; tr?i iF #aai #Esl se;g* Eaae a 3 5 B =. j IFfi *q B;1i€6'9FE { Tm o.tI t- €oo mt-m -m >| T5PH 5g 6 za t- -{6z z-ooc,om95t'rrc)5;filF1fi'EPr 3 6n17 z^3a | | I Hltrttlcoo>EPBEE6gi ! E.:*=az -{trtrtttl zm€ l--{ lTlu{ d2 : z x m : -.{ m o P C'o I.ll -{ r- t dz N:R1iifEci>nzoc)O-<z O 1tl "8E= =ba-l6ozz Nm= si_ <-Pe mzt4l i> i'o.tm 1Oi!aioz. JOD'na{r.O)-nDx DI t(,^) -l m -l; ^zm tt t- m zzo F F zaz -1m(A BI EIz at, I.-t ,n>tdl'l I I I I El-l I !r =6 c 1 e)- it^ ,F| N -to-{ -1lrfln .={'nmmq, 6m{ x t-I'l z m + 0m2o2Tm =m = rtl g a z.t! f, =mo 2 f) t- t- =q z mT'm = r zo m x tD F z m 3 1'mv ={.Tl nIrnU' VALUATION ! lTlFIq zo m z r 3a- =ez mt-fic) I c) t- @ F zo (JJ Nsr..o F O@O t\) @(o (^) (tr 9!)F( I I $ I I I (tl (J| N)(Jl oo O(f o (JtO O roO o +o oo (t Cr) O) oO Hs5 (JrO f\)@(o ()o uLF, lq/0'/ b lnl(a il ,r7 csi'j i U ST'$lUC I !C['{ PEi:li;i I'l' -t ,<) -t +-/' \ -i ,/ -/ <J -u2 :. --"' .. ti:;: : : :;.i.: ;r'. o i ccmi';u;r! iy d e'.,elopmeilt TO 8E FiLLEC CUT CO:,1Pi-ETELY PRIORTO ISSUANCEOF PERMIT TYPE OF PER[1IT ! eutoincff Etaclnrc,rL :.i'r!cl-lAr,lrcAL PLUI,4 BING FOUNDATION c,r,r l/A ,' I Co la ea.47t-35o1 T'\..'N C.F VAIL FEG. NO.-3e ;or..'N cF \/Au- R3G. NO. -l Tn /1:,/tl=o G 5:.,i!RAl Lv.r l i( A!, 1\,i\ \1!CiJAiI iCAL vr-.inr\Llvi\ cn ta( LU ..i I :C,..'N OF VAIL HEG. NO, TC1'/N OF VAIL PEC. NO, l.,t E /-t,f r; Trl "N Ci VAIL REG NO. L L: \ t l{t1!. I Lr\:r*rr.;..* NOTE DATE - COPY OF PE']MIT TO gE KEPT ON JOBSITE 0010i5 4,1I.TYPE OFCONSTIIUCTION . I II III I\ 2.OCCUPANCYGROUP ABEHI otvtstoN , , ,$o GENERAL DESCRIPTION OF WORK : - A@,"F.gAl t> R \tt$:L+f PERr"rtr NO. I rrrn-Dr;;r: | ),'1 '/ I ', a t z F 5) ELECTIIICI.L PLUI..I BIN G t-l ..t9p,aF fr'IECHANICAL j z +7, oz, GROUP SO. FT. V^LUATION PERI,lIT FELP3EUlLOn rC P E Rt,{ iT t vToa PLAN CHECK / {1.52 36, eo i'lE\\' ( ) ALTERATION( ) AO0lTlOi.lr\L (() REPAIfr( ) OWELLING UNITS - ACCOI,IINODATION UNITS- G.R.F.A. 649.-eEonooi,,rs CO I./tIVIERC|AL SYST -COVEREO PARKINC HEIGHT IN FT. - UNCOVEREO PARKINC - NO FTREPTACES PL U I,l BING s:o, aa MtcHAr.lrcAL Ao. eo nccnEATrcH r* J6 7e-e l') E srG I,i n EviE"t e0AR0 5-O. ed CLEAN.UP OEFOgIT /eo-eo USE TAX s57. oo INSULATION TOTAL PERI,,IIT FEES /asg . fo FLOOR EXT. WATLS ROOF IITE THICKNESS R.VALUE ilunoTicFo?FrcrAL-- - - 6,tlE : - 4.*.-q=- v4+-</zlgi - -i,olrfNc Aor,l nlsTRAToR - dATf HEAT { IZON|NG & BUILOING NOTES: - I ELEC: I GAS: i I I 99$1:--- -- -* *--L.Y99-o; rl I f hereby acknorvledge that lhave read this application, filled out in full the informatian requitea, completcd an accurate plot plan. anC state that all the intor,'nation pro,tided es requitel ;,. cutect. I aErce to comply vrith the information and plot plan, to contpl,/', itfi all'Tcwn ord:nenc?i er.C 3t,-,.? lavrs. and to build this structure according to the Toy/n's zoning and subdivision co4e., a?ti?n review approved, Uniform Building Code and ofhor ordinances of the Town applicable thetEic. t: fl, STGNATURE qF OylNEB OR CONT8ACTOi ?O? htr/,iz-F J ANO THE OYINEA. INSPEQIION: * JOB NAME MON CALLER TUES THUR :i' READY FOR LOCATION: ,l t"': '' ftt''i' t DATE 'l'; ;t WED INSPECTION REQUEST TOWN VAIL BUILDING:PLUMBING: tr UNDERGROUND tr ROUGH i D,W,V. tr ROUGH / WATER tr FOOTINGS / STEEL tr FOUNDAT tr FRAMING ION / STEEL n ROOF & SHEER- PLYWOOD NAILING tr GAS PIPING tr INSULATION tr POOL / H. TUB tr SHEETROCK NAIL tr tr ELECTRICAL: tr TEMP. POWER MECHANIGAL: tr HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR n_ tr FINAL tr FINAL tr APPROVED CORRECTIONS: tr DISAPPROVED tr REINSPECTION REQUIRED t DATE INSPECTOR ,;. REQUESTVAIL .^ 'CTION TOWN OF JOB NAME BUILDING: tr FOOTINGS / STEEL PLUItIBING: tr UNDERGROUND tr ROUGH / D.W.V.tr FOUNDATION / STEEL tr FRAMING tr ROUGH/WATER n ROOF & SHEER- PLYWOOD NAILING tr GAS PIPING tr INSULATION tr SHEETROCK tr POOL/ H. TUB NAIL u tr tr tr tr FINAL FINAL ELEGTRICAL: tr TEMP. POWER ITIECHANICAL: tr HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR tr FINAL tr FINAL ffheenoveo Z. CORRECTIONS: tr DISAPPROVED T] REINSPECTION REOUIRED INSPECTOR rNsilcrroN REouEsr-iOWfrt OF VAIL 'ii"r* \'r' DATE JOB NAME .rr'.. READY FOR LOCATION: INSPECTION: CALLER TUES rHufi ,' .a .,, . MON WED FRI PM BUILDING: tr FOOTINGS / STEEL PLUItIBING: q UNDERGROUND tr FOUNDATION / STEEL tr FBAMING r-r ROOF & SHEER- PLYWOOD NAILING tr tr tr n GAS PIPING tr INSULATION tr SHEETROCK D- POOL / H. TUB NAIL tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER ITIECHANIGAL: tr HEATING tr ROUGH r] EXHAUST HOODS tr tr CONDUIT tr n SUPPLY AIR ,,.ftr FIMAL tr FINAL /APPROVED tr DISAPPROVED T] REINSPECTION REQUIRED CORRECTIONS: DATE /INSPECTOR '.7- 7-1,:: -.---4*-- - DATE JOB NAME rNsilctoN TOWN OF neouE$T " vAlL *4rt .+ INSPECTION: CALLER MON TUES WED ..-. THUR}FRI AM.. PMREADY FOR LOCATION: BUILDING: tr FOOTINGS / STEEL tr FOUNDATION / STEEL tr FRAMING r-r ROOF & SHEER" PLYWOOD NAILING tr INSULATION - PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH/WATER tr GAS PIPING tr POOL/ H. TUB trSH E tr FINAL ELECTRIGAL: tr TEMP. POWER ITIEGHANICAL: tr HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR trtr tr FINAL tr FINAL ,{.li,tr FINAL " EI APPROVED CORRECTIONS: B DISAPPROVED tr REINSPECTION REOUIRED INgPECTOR tltatinltY/t.ll IN itl) , CTIONTOWN OF i" REOUEST " vAlL '. ,*. .'s DATE READY FOR LOCATION: INSPECTION: JOB NAME -nno)+") CALLER TUES W,ED THUR FRI BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND .F ROUGH / D.W.V.tr FOUNDATION / STEEL ROOF & SHEER PLYWOOD NAILING V ROUGH / WATER ,'/ \ tr GAS PIPING POOL / H. TUB FINAL tr HEATING ., tr EXHAUST HOODS Xsuppr-v nrn tr DISAPPROVED T] REINSPECTION ;ourREp CORRECTIONS: D^rE (./" F,/)* <tl ""- rNspEcroR * gJ^fplt REouHqr DATE READY FOR LOCATION: INSPECTION: JOB NAME MON CALLER TUES WED THUR AM tf. ,' l.r, 'Q) BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V.tr FOUNDATION / STEEL tr FRAMING tr ROUGH/WATER n ROOF & SHEER", PLYWOOD NAILING tr GAS PIPING INSULATION tr POOL/ H. TUB tr SHEETROCK NAIL tr trtr tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: tr HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR tr tr T] FINAI.tr FINAL i+fr*PRovED," CORRECTIONS: tr DISAPPROVED tr REINSPECTION REQUIRED , : DATE i? - /.'.'- j INSPECTOR CTION TOWN OF t- REOUEST VAIL JOB NAME MON CALLEB v_. AM I PM .,.READY FOR INSPECTION: LOCATION: '"t"'- \,,.T_l-l_UR"' tr FOUNDATION / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH/WATER r-1 ROOF & SHEER" PLYWOOD NAILING tr GAS PIPING tr INSULATION tr POOL/ H. TUB tr SHEETROCK NAIL tr HEATING tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR OVED ' COBRECTIONS: tr DISAPPROVED tr REINSPECTION REQUIRED DATE _clfpN- nFouHs.[TOWN OF VAIL! DATE READY FOR INSPECTION: LOGATION: JOB NAME MON CALLER TUES THUR FRI/,_ ar--_ ' ^_".- . : PMAM BUILDING: FOOTINGS / STEEL FOUNDATION / STEEL FRAMING ROOF & SHEER PLYWOOD NAILING INSULATION SHEETROCK NAIL - tr -tr tr tr tr tr tr tr tr PLUIIBING: tr UNDERGROUND tr BOUGH / D.W.V. tr ROUGH/WATER tr GAS tr POOL PIPING / H. TUB tr FINAL tr FINAL ELEGTRICAL: tr TEMP. POWER F ROUGH tr CONDUIT MECHANIGAL: tr HEATING tr EXHAUST HOODS tr SUPPLY AIR tr FINAL FINAL tr tr tr V Rppnoveo CORRECTIONS: tr DISAPPROVED tr REINSPECTION REQUIRED ,./ [ "^*INSPECTOR liatl rt/vall .f ,rlf.--! G,I INSPECTION REQUEIIT* DATE READY FOR LOCATION: INSPECTION: JOB NAME MON , (_.- CALLER tucs:WED THUR .) \, I FRI AM t,g-:, / , a (-, BUILDING: N FOOTINGS / STEEL. PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER tr FOUNDATION / STEEL tr FRAMING rr ROOF & SHEER" PLYWOOD NAILING O GAS PIPING tr INSULATION POOL / H. TUB tr SHEETROCK NAIL E FINAL ELEGTRICAL: tr TEMP. POWER MECHANICAL: N HEATING D ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIB tr DISAPPROVED tr BEINSPECTION REQUIRED CORRECTIONS: INSPECTOR I }. DATE .T . JoB NAME INSPECTION:MON I rn#gg*o5, $F.ouhsT' READY FOR LOCATION: WED THUR FRI AM PM BUILDING: F FOOTTNGS / STEEL PLUMBING: tr UNDEBGROUND tr BOUGH / D.W.V. tr ROUGH/WATER tr FOUNDATION / STEEL tr FRAMING n ROOF & SHEER- PLYWOOD NAILING tr GAS PIPING tr INSULATION tr POOL/ H. TUB tr SHEETROCK NAIL tr utr tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: tr HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR tr tr tr tr FINAL APPROVED B DISAPPROVED tr REINSPECTION REQUIRED ,,2 CORRECTIONS: DATE .,t- v - ; t.-- BUILDING: tr FOOTINGS / STEEL PLUItIBING: tr UNDERGROUND tr ROUGH / D.W.V. tr BOUGH / WATER tr FOUNDATION / STEEL tr FRAMING r-r BOOF & SHEER" PLYWOOD NAILING tr GAS PIPING tr INSULATION tr POOL/ H. TUB tr SHEETROCK NAIL tr tr u tr FINAL T] FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: tr HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR tr tr FINAL tr tr FINAL tr APPROVED CORRECTIONS: tr DISAPPROVED , E}fEINSPECTION REQUIRED INSPECTOR .DATE 7- z- ,i''--- .| .1. 'l TOWN OF tREQUE TvAlL If " DATE READY FOR LOCATION: JOB NAME INSPECTION:MON APPROVED CORRECTIONS: tr DISAPPROVED tr REINSPECTION REQUIRED BUILDING: F FOOTTNGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH/WATEF tr FOUNDATION / STEEL B FRAMING n ROOF & SHEER- PLYWOOD NAILING tr tr tr tr GAS PIPING tr INSULATION POOL / H. TUB tr SHEETROCK NAIL tr tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: tr HEATING tr ROUGH tr EXHAUST HOODS tr GONDUIT r] SUPPLY AIR tr tr B FINAL O FINAL DATE INSPECTOR tF* INSPECTION REQI'ES" TOWN OF VAIL DATE READY FOR LOCATION: JOB NAME INSPECTIOo/ l tr DISAPPROVED D REINSPECTION REQUIRED BUILDING: PLUMBING: tr FOOTINGS / STEEL tr UNDERGROUND D ROUGH / D.W.V. tr ROUGH / WATER tr FOUNDATION / STEE_ D FRAMING _ ROOF & SHEEB" PLYWOOD NAILING tr GAS PIPING tr INSULATION tr POOL / H. TUB tr SHEETROCK NAIL tr tr tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MECHANIGAL: E] HEATING fI tr o ROUGH tr EXHAUST HOODS CONDUIT tr SUPPLY AIR FINAL tr FINAL {neenoveo/ coRREcloNS: oate ,1'l I ' /"/* rNSpEcroR 23 Jr.ne 1982 Mr. Steve Fattergon Vai t'&rllding Qtparrnwnt Torm of Veil Vail, Colordo g!65?, Dear Mr. P attci.son-- The Owner {ard'Euitder) hovc F.qr# *rat we not fdlow t}re;prsjest.r cqnstructlon. Errclbs{d foe yoj|. usc qAd.rsviru,ie a gFcc havc not seen. llqta;{hot enclosed i*.Adderb : I hopc thie.will help to call me. ,Altlrorgh our buildcr wet] built prsject. Jeff Ehrrlesqn,AIA . elqc losur.og ]:i.-.:. cobell childreil tt 'll. (.,.rba | | childre r t orrilf",{, 1980 wozoo tl(@ot. denvor. colorodo 8020P .303 825-4745 23 Apnil 1982 Mr. Menl in Br iggs Box 264 Frisco, Colorado 80443 Re: The Hart Addition Dear Merlin, The fol lowing is Addenda #l l<:r the Hant Addition. Same should be submitted to Vail Building Department with Drawings and Specif ications for permit. I believe this answers most questions from our on-site meeting Wednesday. ADDENDA #I Delete foundation Detail # | ' Substitute the following: Drill into existing foundation to neceive dowels, 2 each at I'o.c. vertical. Dorvels (#5 r'ebar-) shall be bent, angled down into existing wall minimum 6". Hor^izontal end to dowel into nerv wall minimum 2' , We concun with your suggestion for lorvering existing foundation wall at Kitchen: Shore up f loor f rom below. Saw cut existing foundation wall - Install new plate anchored at 16" o.c., build new cripple wall up to existing aligning new studs vertically with existing- Tying floor^ joists to existing foundation wall at Kitchen south: Use joist hangers for support on existing rim joist. This is assuming nim joist is continuous; if actual condition is blccl<ing between joists, remove blocking, bear joists on existing plate, then neinstall blocking. Bearing of 8' x 14' beam to 4 x column at Deck: Use Simpson connecton for beam bearing on top of column. New f loor ioists to be 16" o. c. <obell chrldre rt f .o.i.o.1of f burleron o.i.o. (+ ( (:il.),lil , irli(ir\.1 i,i i..lItiii:i. I(-i I t3 Condially, Jeff Br.rrleson, AIA 1 A 7 B 9 Top lay<:r of roof sheathing to be 5/8" plywood' See Detail #'l 2 enclosed for option al lower levcl west foundation wall . Reuse existing garbage disPosal . Reinstall existing stereocabinet as discussed, removing east unit of book shelving to make room ton new location' Reuse existing divided lite exterior door and screen from east dining. Reinstall at new west deck' Reuse existing divided lite west door in approximately same location' Eliminate side lites, build gypsum board stud wall from fireplace to nocth, installing door to swing nor^th into west Kitchen. Add to Kitchen trash compactor: Kitchen Aid KCS-l00 with tnim kit for wood panel' Modification Drawing to millwork will be issued later' Shelves in china closet to be glass. Closet to be lit from the top with recessed incandescent can' Delete north portion of stone site wall to north of housc' (West is to remain.) Cantilever f loor joists to support a 4' wide walkway. Handrail and rryall to be same as for deck ' Additional Drawing to be issued later'. l0 ll IL t4 tI I I I I t I I I Construction Documents Project Manual HART ADDITION l2 April 1982 I I I I I t I I I I t T I t B-474 JEff BWt$or{ B-1338 .l 56 Chase Stone Center O Colorado Springs, Colorado 80902 Phone (303) 471 lBB2 I 192 Gore Creek,.Drive Vail. Colorado 81657 Phone (303) 416-3129 THE SQUASH BLOSSOM ,4 // t/ QzL/z* 8 - )1 va- .4/.U,e=a-." 4-"Jr'/ ,?'/- *Z-'r- /--'f- -caa--zL.4-1.."2 -L -Lvz "1),o ,r-+-, 4. 2,/2--- 4-"- --,^-e--4LJ -k ; -1Vr*'z- *4* "n--eo*-*/ (w{, -r-,ZJ E f-Z-/ a-?'L-2/ -/ \ ao ao i Ii II . zoNE !ilLCI fors:[, R, n P/s zoNr DISTRICTs Description: Lot Architect Zone District Proposed Use Legal 0rnter 4 a,o"u Fil ing #2 Setbacks: tront-Requii'ea 26't'--nro'poseo - Sidcs-Required lS, proposed Rear -RcquireC l5' proposed lrla terccu r.se-requ i re d propo sed GRFA: GRFA:Primary A'l'lor,red Secondary Al I or.red Si te Covcra ge : I.r'l 'l oir'ed Ar'lor,red i647?. _re.r,,r"=* /v1t d Sil-ope Proposed Proposcd Propl;: ed Actual Landscaping: Parking: . Required Requi red flrive: Slope Fermitted Environniental/llazar.cls: .Ava'lanche . Flood Plain . 'S1ope LOffntents ;. tl.rtr".:3 cobal I childror t orchitoctr 1980 uozea rlro@t. donvor. colorodo 80909 . 3O3 825-4745 22 March 1982 Mr. James Sayre Department of Community Development Town of Vail Vai I, Colonado Bl 657 Re: Hart House Addition Dear Mr. Sayre, Enclosed are the required items for the Design Review Board in two copies. 1 Floor Plans (existing and new). 2 Site Plan. 3 Elevations (new with existing). 4 Photos of existing house. 5 Materials List. Also enclosed is an existing land survey. We will be wonking on additional information which will be avai lable at the Design Review Board Meeting. I will be contacting you later this week to assist with any questions and comments. enc losure Jeff Burleson, AIA coball childre.r.r f.o.i.o.jaf F burleron o.i.o. -- Project Application Project Description: contacr person and pnon" C .(-i . f\r-i'2l_ o[' -l+\k-rG i-{-rt Cr 1 Owner, Address and Phone: Architect, Address and Phone: n Lt t)rv6Cr D6d Legal Descriplion: Lot 4J- , Btock 1ui {3Dr V. , Filing t-, Zone - Com ments: Design Review Board '^" /frlrn- DISAPPROVAL . N,l1;1li 'iil; l,t{i),,1:C'l' HART ' t,l;(;Al, l)!::,1:li il)'l't0N: t.()'l' 4 il1,0(:K Foof 51d lng Other l'ial1 Materials Fascia Soffits Windows l{indow Trim Doors Door Trin Hand or Deck Rails F lues Flashings Chinmeys Trash Encl osures Greenhor.rs es 0ther li ll,ll'l(; Lions Ridge Subdivision #2Lrons firqge Juoor vrs It Shinqies ro wn l)lildill li'.1 Ir;.i ()l; l'lt0.,li(;i'_6,35_squane feet total addition: Kitchen Expansion, Master Bedroom a nd Ba th' Add .T_wo. ( 2 ) _P.99 ks."-Re !_osa te MejlX-l ig ql--R.. g...**_ l'hc foll()r.,ing inforrnlt iorr is rc<1ni r.t:d for :;ulrrir ittal by thc ap|t i(:;rnL I.o the Destl:n tii:v.i cuBoard bcl.t>r'c a fi.naI itl)provill c:rtr bc llivcn: A. lltll l,lrTiiii MA'l'liRlAl.S TyPc of 1.1:r t j-:f.'lgl (l,r I trr Rough sawn Sprfuce w i th weed.ki | | en and bu nned allow to weather . B. LANDSCAPING: Name of Designer:phone : PLANT MATERIALS TREES SHRUBS SeeSectionCfor Cabell Childr ess 1-825-4745 F iel d Stone White Insulating Glass Clear Douglas Fir Olympic f 711 Erown Spruce. (Same as siding) Douglas Fir Olympic f71 1 Brown Douglas Fir'Natur a I 9alvanized lr-ora _ Brown .,. - _* Galv.Anize!. I r:on - - _ .Brovvr.|. __ - nuce (Same as sidi Additipn will retain the chanacter and materials of the existi nq house . explahation. Architects Common Name Si ze Aspen Pine Botanical Name (See Sidi : GROUND COVERS SOD SQUARE FOOTAGT SEED TYPT OF IRRIGATION TYPE SQUARE FOOTAGE TYPE OR MTTHOD OF EROSION CONTROL 0ther Site c.Landscape Features (retaining wal1s, fences,swimni ng poo1s, etc.) Please native tnees and specify. s nr' rowth ofwill be neseeded in natural grasses and allow for Decks and site wal I ar e shown on the Drawin i-tl;T r LION S R IDGE6fu, SUBDIVISION Ka siloifll To ?HE BssT or HY tiNowLEDGE Aili{ l,IERg SET AND NO !'ENCES l{ERlj l,OCiiTe$.'.\b} FILING NO. 2 EAGLE COUNTY CO LORADO F:i'. i': i-: i: i-. NO PROPERTY CORNERS d* CI \d" \B_ -\8_ \ \,. "*d)as oo\ SCALE C - PIN FOUND ?4 1'.4 ,ro, \'\,, -- ,I, WILLIAM E. ARI'IFIELD, BEING A REGISTERED LAND SURVEYOR IN / TIIE STATE OF,COLORADO, DO HEREBY CERTIFY THAT A SURVEY I'IAS IIADE BY I.IE A}ID UNDER }IY SUPBRVISION OF LOT 4 LIO}JS RIDGE SUBDIVISION FILING l'IO. 2, COUNTY OF SUMliIt, STATE OF COLOitADOf AND rOUND THg TI.IO STORY FRtu\lE BUILDING TO BE LOCITTBD ENTIRELY !{ITHIN THE BoUNDARY LINSS OF THS ABOVE DESCRIBED PROPEIITY. TI{B LOCATION AND DII.IENSIONS OF ALL BUTLDINGS, II,,1PROVEI"1ENTS, EI\SSIIENTS AltD RIGIITS OF ;\tAY rli SVIDENCE OR KNOTJN tO UN AND ENCROACH}IENTS BY OR O}I TIIE PREI-IISES ;"iRE ACCURi'TELY $ll t &ii: DECEMBER 20, L972 AFrr\,!{ GF.iE :#x'yl;) !l Jx L, I :rt)o t liii.il:'(il; I'11i).il:(i1' HART HO l;ll.ll,iti Lions Ridge Subdivision #2 l;lr:;(.li li'l l(i;; ()l: I'ltU.ll:(l l' 635 square feet total addition: Kitchen Expansion, Master Bedroom ___ar1{_ e " t h, A!g_T ryg-!a_D-ecks..-R e l oc q t e Mec bel iS q!--Rooln ]'hc foll(,r'rinLl inforrnetion irr rc< r[1.q{ for sulrrrrittll by t-hc lloard bclorr: a final itpprovul cirrr bc givcn: uppl ir:rrnt. to thO Dcsilirr lir:yi1..y A. lllf ll,lrliiil 144,'l'[nlAl,S t{oot Siding Other l'ial1 Materials Fascia Soffits Windovrs lYindow Trin Doors Door Trin Hand or Deck Rails Flues Flashings Chimneys Trash Errclosures Greenhotrses Other 'ULc ol ltl;rtj-1L'lal Asphalt Shingles !i,-!s Bnown Rough sawn SprLce burned with weed killer and allowed to weather. Field Stone Gypsum. Soff it White lnsulating Glass .Clear Douglas Fin Olympic #?l1 Brown ' Spr"uce. (Same as siding) Douglas Fir Olympic #711 Brown Douglas Fir'Na tura I Galvanized lron., . Bnown ,, GaLv.alnized lion -. - ,- Br-own - Spruce (Same as siding) _ Additipn will retain the character and materials of the B. LANDSCAPING: Name of Designer: Phone : PLANT MATERIALS TREES See Section C fon explahation. Cabell Chi ldress Architects Botani ca'l Name Corrnon Name Quanti ty Sl ze Aspen Pine SHRUBS GROUNO COVERS oo SQUARE FOOTAGE ro SOD SQUARE Fo0TAGE SEED TYPE SQUARE FOOTAGE TYPE OF IRRIGATION TYPE OR METHOD OF ERO5ION CONTROL C. 0ther Landscape Features (retaining walls, fences, sw'imrning pools, etc.) P'lease specify. Site will be neseede.d, ih natural grasses and allow fon gr-owth of native trees and . shrubs. Decks. and site wd-l.l ane shown on the Drawings. _ \' j"LION S R IDGE s,5* i-t* SUBDIVISION FILING NO. 2 r EAG L E COU NTY CO LORADO lr . Fr ,. F ri" ,L\ !'( '... r-- L. s t% 1IAS MADB BY o.4974 I ,a .- tAnderson and Hastings 2059 Bryant Street Denver, Colonado 8O2O4 433-8486 I I I I I I I I T t I I I t I I t ARCHITECTS Cabell Chi ldress Architects 1 980 Wazee Street Denver, Colonado BA2O2 825-4745 STRUCTURAL MECHAN ICAL Mc Fall, Konkel and Kimball 2160 South Clermont Street Denver, Colorado 80222 753-1260 T l. It ItI il I I I I I I I I I I t I t I H INDEX AIA GENERAL CONDITIONS SUPPLEMENTARY GENERAL CONDIT IONS CLEAN ING DEMOL I T ION SITEWORK STONEIVORK CONCRETE ROUGH CARPENTRY FINISH CARPENTRY GYPSUM BOARD TILE AND MARBLE PAINT ING EQU IPMENT MECHAN ICAL ELECTR ICAL I I t f]\,GLNi.-I1AL5\Jijl)t f Ml-N 1 r\CONI] I T IONS I TNTENT oF THE DRAwINGS AND sPEclFlcATloNs r All bui lding materials, systems, and details are to be complete, operating, and in the I f inest cr-af tsmanl ike manner. The Drawings and Specif ications indicate the intended I results and leave latitude for accomplishment. Prior to Construction Pnicing: The General Contnacton and his field superintendant are to satisfy themselves that sufficient details, data, and dimensions are provided so that the ful I intent of the Dnawings and Specifications can be met. if furthen information ig con- sidened desirable, the Contractor will pr-ovide the Architect with an itemized list or a red-rnarked set of Drawings noting the requested information. Changes in the Owner-Contnactor contract ane not expected at this time as matters affecting price are to be settled prior to pricing. During Construction: The Contractor or his field superintendent may at any tirne during construction nequest funther information of a reasonable nature from the AFchitect. MANUFACTURERS RECOMMENDED PROCEDUI]ES All products, systems, manufactured items, etc,, pnovided with directions for use by the respective manufacturer shall be used accordingl y. Any deviation fnom such di- rections, unless specifically dinected by the Architect' may warnant nemoval and coc- rections at the Contnactor{s expense. Conf licts arising due to job conditions shall be dinected to the Architect'5 attention prior io proceeding ' QUEST IONS Calt the Architect @25-4?45J when questions arise and before work is done, if possible. I I I t I I I I I HANGE IN SPECIFI D OR DETAILED MATERIAL OR METHODS I I I t I I When the Contractor elects to use appnoved subsiitutions' to coordinate the necessary changes in construction. ONE MONTH RETURN One (1) month after occupancy the Owner will provide the to be corrected or added. The Contractor will provide a respond promptly to both the conrective and a reasonable PROMPTNESS AND COURTESY it will become his responsibi litY Contnactor with a list of items pnice fon the aided items and amount of added items. The Contractor, his ernpolyees and all Subcontractors will arrive promptly each day at a time agreed to in the preiiminary meeting with Owner and Architect' Workens will at all times conduct themselves in a polite and courteous manner to Owner, children' ser- vants and neighbors . SGC I NERAL CONDIT'IONS YEAR ENp lrylPECTION Within the thirty (30) days pnior to one (1) year completion of the building, an inspection of the bui lding will be made to note items to be corrected unden the one (1) year guanantee and other items the Owner desired to add. The Contractor- will provide a pnice for -the added items and respond promptly to both the corrective and a reasonable amount of edded items. OIAINER OCCUPANCY The house is presently occupied. This Contractor shall coordinale access' scheduling' and other phases of the Work (such as power outage . . . ) with the Ownen. He shall make an effort to not unreasonably disrupt the Owner's routine. o SUPPLEMENTARY GE I I I I I I I I I I I I I I I I I I t I END OF SECTION SGC2 I CLL /rlrl l N(j GENERAL r.01 1.02 B DESCRIPTION (FOR GENERAL GUIDANCE - NOT ALL INCLUSIVE) Work lncluded: Throughout the construction period, maintain the building and site in the neighborhood standard of cleanl iness. QUALITY ASSURANCE Inspection: Conduct daily inspection, and more often if necessary, to verify that nequirements of cleanl iness are being met. Ownen - Architect - Contnactor shall a'gree prior to start of Work' proceedures for clean-up, material storage, dust control and trash removal. PRODUCTS I I I I I I I I I I I I t I I I I I I 2.01 2.42 CLEANING MATERIALS AND EQUIPMENT Provide personnel , equipment and materials needed to maintain the specified standard of cl eanl iness. COMPATIBILITY use only the cleaning materials and equipment which are compatible with the surface being cleaned, as necommended by the manufacturer of the material or as approved by the Afchitect ' EXECUTION 3.01 PROGRESS CLEANING Genera l: I Retain all stored items in an orderly arrangement allowing maximum access' not impeding drainage o|. traffic, and providing the required protection of ma terial s . 2 DO not allow the accumulation of scrap, debris, waste material , and other items not required for construction of this Wonk. 3 Provide adequate stonage for all items awaiiing removal from the job site' observing all requirements for fire protection and protection of the Owners property. I B (- B I I I I I I t I I I I I I I I I I I I 1nt (ji-Lu\lillN(l Site: I Daily, and more often if necessaFy, inspect the site and pick up all scrap' debris. and waste matepial . Remove all such items to the place designated for their stonage. 2 Weekly, and more often if necessary, inspect al I arrangements of materials stoned on the site: restack, tidy or othenwise service all arr-angements to meet the nequirements of paragraph 3.01*A-1 above' 3 Maintain the site in a neat and orderly condition at all times of the Architect. to the approva I Buildingr 1 Weekly, and more often if necessary, inspect the building and pick up all s.""p, debris, and waste materisl. Remove all such items to the place designaied for thein storage. FINAL CLEANING Definition: Ixcept as otherwise specifically provided' 'tcleanr' (for the pur-- pose of this Article) shal I be interpreted as meaning the level of cleanliness generally pnovided by a lady expecting company. Site: Unless otherwise specifically dinected by the Architect, hose down all paved areas on the site and all public sidewalks directly adjacent to the site, completely remove all resultant debris from construction' Structures: 1 Exterior: Visually inspect ail exterior surfaces and remove all traces of soil, waste material ,smudges, andother foreign matler. Remove all traces <>f splashed matef ials from adjacent surfaces. lf necessary to achieve a uniform degree of exterior cleanliness, hose down the exterior of the structure. In the event of stubborn stains not on the building at the be- ginning of the work and not removable with water, the Architect may require olher cleaning at no additonal cost to the Ownen' 2 Interior: Visually inspect all interion surfaces and remove all traces of soil, waste material , smudges, and other foreign matter, Remove all traces of splashed materials from adjacent surfaces. Remove all paint droppings, labels, spots' stain , and dirt from finished surfaces' Use only appropriate cleaning matenials and equipment' 3 Glass: Clean all glass inside and outside the Work area' \ '! END OF SECTION DEMOL I T ION GENERAL I I I I I I I I I I I I I I I I I I I 1 .0i l:I B DESCRIPTION (FOR GENERAL GUIDANCE - NOT ALL INCLUSIVE) Work Included: Demolition and/or removal for this Work includes, but is no1 necessari ly I imited to: I Removal and relocation of mechanical equipment and utility lines. 2 Removal of abandoned electrical equipment. 3 Removal of parlitions, windows, platfonms and other items. 4 Exposing of existing stnuctune for connection of addition. 5 Careful removal of cabinets to be reused. 6 Removal of cabinets not to be reused. ? other miscel ianeous demolition indicated on the Drawings and required to comolete indicated Wonk. I Opening and material removal of structure and finish for new windows. 9 Dust control , Def inition: The term "demol itiont' , as used herein, indicated the removal of all existing objects designated for removal , plus such othen work as descnibed in this Section of these Specif ications. QUALITY ASSURANCE In addition to complying with all pentinent codes and regulations, comply with the requirements of all insunance carriers providing coverage for this work. lnstallers: 1 All Work in this Section to be accompl ished under direct r on-site supervision of thonoughly trained and experienced journeymen who are completely familiar with the requirements of this Work and the necommendations contained in the reference standards. 2 ln acceptance of the finished work, allowance will not be made for lack of skill on the Dart of the workers' I I,UJ B DEMOL IT ION JOB CONDIT IONS Dust Control: Use all means necessary to prevent spread of dust during perfonmance of the Work of this Section. Protect ion: I Use all means necessany to protect existing objects designated to remain and, in the event of damage, immediately make al I repairs and replaceme-nts necessary to the approval of the Architect and at no additional cost to the Owner. 2 erect barriers, guard rails, enclosuFes, etc, to protect pensonnel , chi ldren, structure and othen items. PRODUCTS I I t T t I I I I I I I I I I I T I 2.01 MATER iALS Provide materials required for proper- completion of the Wonk of this Section. EXECUTION J.UI R I -- (^ PREPARAT ION Notification: Notify the Anchitect and Owner at least two (2) full wonking days prior to commencing the la/ork of this Section. Site Inspection: 1 Prior to all work of this section, carefully inspect the entire stnucture and all objects designated to be removed and to be preserved. 2 Locate all existing active utility lines traversing the construction are and determine ihe requirements for their- protection. Clarification: 'l The Drawings do not punpont to show all objects existing. 2 Befone commencing the Work of this Section, verify with the Architect all objects to be removed and all objects to be presenved. IJ E t I I I I I I I I t I I I I I I I I I uEMOl. I f lt)f! Schedul ing: I Schedule all work in a careful manner with all necessary considenation for the adjacent area and PeoPle' 2 Avoid interference with the use of, and passage to and from the adjacent rooms . Disconnection of Utilities: Before starting site operations, disconnect or arrange for the disconnection of all utility senvices designated to be nemoved. Pnotection of Utilities: Presenve in operating conditions all active utilities traversing the stnucture and designated to remain' REMOVAL OF DEBRIS Remove all debnis from the site'and di sposal of all removed materials legally. Leave the sile in a neat and ordenly condition to the approval of the A.rchitec!. SALAVAGE parts, electrical fittings and other reusabl e Thev are for spar^e parts for the rest ot -TheContrac|orwiIlmeetwiththeOwnerandAr^chitectpriortoDemoIitionto agree on whats to be saved ' END OF SECTION F 3.03 3.04 Save all usable hardware, Plumbing items , Box them and give to Ownen ' the house . - I I I SITEWORK GENERAL I 1.0r DESCRrprroN (FoR GENERAL GUTDANcE - NoT ALL rNcLUSrvE)t Work included is clearing, excavation, removal, compaction, dnain tile, I backfill, gnading and seeding. I PRODUCTSI 2.O1 BACKF ILL I On-site soiis free of debris may be used for backfill, I 2.02 GRAVEL - Maximum size 3/4". I z.o3 DRAIN rrLE 6" perforated pipe. I z.o4 'EED r f 'Natural'r seed mixture. I I EXECUTION 3.Oi PREPARATION I A Surface rock ilichen covered) is to be car-efully removed by hand or netting so surface is not damaged and stockpiled fon futune use. I B Clean the minimum area of brush, stumps and debris.I C Scnape and stockpile top 6'r of top soil saving seed content as possible. II D Conduct excavation pnocess with particular cane to avoid tree damage to tnunk, noots or fill over roois. t E Avoid pushing dint over natural ground cover. r F Avoid scratching rock outcroppings, I t I - I I I I I I I I I t I I I t I I I I I SITEWORK SO ILS Sub-soiltype and characteristics to be detenmined by inspection by owner's Soil Engineer at time of excavation. CLEAR ING The Contractor shall remove those trees or shnubs necessary only for actual construction of foundations ' BACKF ILL I NG Fill: Clean free of lange stones and organic debris' Compaction: Fill under slabs and anound perimeter walls shall be 9570 compacted in 6'r layers using mechanical tampers. Do not backfill against foundation walls until concrete lras gained strength and supporting floors are in place. DRA INAGE Mininium finish grading of 12" fall within 10t of the building is essential, insune pnoper drainage of entire site. Excessive wetting or drying of the foundation excavation should be avoided during construction. PUh,IPING AND BAILING All excavations shall be kept free of water as required to construction forrns, pour concrete, allow concnete to cure and permit the proper conduct of the Work. u,lell points or any similar system shall be used. Provide all purnps, hose, drainage Iines, etc, as may be required to conduct the water away from the site. Al ldrain l.raten shall be discharged where no damage or injury will result. Pumps shall be available on the site during excavation operations and until time as thebasement space is secure from water. EXCESS EXCAVATED MATER I AL After backfilling, excess excavated materials shall become the pnoperty of the Contractor and shall [:e removed from the Owner's property. GRAVEL 4" layer of gravel is to be provided under all concrete slabs. DRAIN TILE Foundation drain shall be provided along the north siCe of the house in a gnavel fi lled trench at foundation level . The dnairr tile shall enlpty onto grade' FROST Protect bottom of excavations from frost. Do not place foundation footings or sfabs on trozen gnound, 3.o2 3. 03 3.04 A B c 3.06 J.U/ 3.08 3.09 J. IU - I I I I I I I I I I t t I I I I t I I 3.11 3.12 S I TEWORK ROUGH GRADING Rough grading requirements will be determined on site by the Architect and Contnacton ' ROCK EXCAVATION lf rock is encountered within the limits of the excavation and has sufficient bear-ing capacity and depth as approved by the Ownents Soils Engineer the wall shall be laid dinecily on the pock. Where rock is required to be blasted wonk shall be done by experienced powdermen using small charges and in stnict accordance wiih all regulations covering this work. Any damage caused by explosives shall be cornected at Contractot''s expense' END OF SECTION SI ONEWOF{K I I I GENERAL I I r.o1 DEScRrprroN (FoR GENERAL GUTDANcE - Nor ALL tNCLUSIvE)I _ A Stonework as building veneen and for site wall and base of deck column. I 1,02 QUALITY ASSURANCE I A Installers: - 1 All work in this Section to be accomplished unden direct, on-site supen- I ;iil;i""J ffi","'Ji'.ffiffi'.:ii;i:;:'"';;:-'i::11"J'Lill:ifi''""':'i:::''I tained in the refenenced standards. I 2 In acceptance of the finished work, allowance will not be made for' lack I of skill on the part of the workers. - 1.03 STANDARDSrr A Follow Colorado Mansonry Institute Standar^d 301-76' PRODUCTS I A Building stone wilt be field stone with lichen 4" to B" thick and 2i squane feet average face surface . I B Do not use masonry cernent. Mortar is to be site prepared from Portland Cement, r hydrated lime (2090 maximum), and clean sand' I C All joints are to be in full mortar beds. Finished joints ar-e to be tooled with I a beaded tool and retooled after initial set to obtain tight joint. I D Take soecial care duning entire process not to damage stone faces. t f Provide G.l. wire on corrigated ties approximately 16" on center. I I I t I END OF SECTION I I I I CONCIiL.T E I GENERAL I 1.01 DEScRlprloN (FoR GENERAL cUTDANCE - Nor ALL INCLUSIvE)t A Work included is indicated on the Drawings, I t.o2 ouALtrY AND STANDARDS ,- A Fol low local buildingcode and recommendations of Ac I 301-79. II B Workers: All Wonk to be accomplished by or under the dinect on-site super- vision of journeymen carpentens experienced in similar work and familiar with I code requirements fon concrete wonk. I I.03 PRODUCT HANDLING I A Storage: Store materials and equipment ad dir-ected by the General Contractor. r 1 .04 TEST tNG I Retain an independent testing laboratory to take two (2) sets of three (3) cylinders (ASTM C1?2) and slump tests (ASTM C143\ 7 day and 28 day neponts shall be I sent to the Architect 'I FRODUCTS o nl ,-ONCRETE I L.v | \.\ I A All concrete shall be 3,000 PSI (28 day) ain entrained $t%o+ 1) redi-mix (ASTM C-94) with proportions based on a mix used successfully on previous I projects in the anea. Minimum cement content six (6) sacks per cubic yard. I B Maximum on truck time to be 1* to 2 hours depending on the weather (concrete held I longen is to be rejected). Thoroughly consolidate all concrete by vibrating I and noddins. C Maximum slumP = 4" ' I 2,O2 RE INFORC ING I A Reinforcing steel (ASTM A615) Grade 40. I B Wire mesh reinforcement (6 x 6 / W2.1 x W2. I ) shall be lapped at least one (l) - full mesh at side and end laps and shallbe wired together' I I rl I I CONCRETE I 2,03 EXPANSION JOINTS I- Provide two (2) layers of fiber building feits at the junction of concnete slabs on grade and vertical walls.I EXECUTIONI3.01 PREPARATION, PLACING AND FORMWORK I A Before placement forms shall be thor^oughly wetted on oiled' the reinforecementI shall be thoroughly cleaned of dirt, nust, scale or other coating' and water shall - be removed from Place of dePosit. I B Concrete shall be deposited as nearly as practicable in its final position to avoid segnegation due to rehandl ing on Flowing. The placing of concrete shall r C When placing is once stanted, it shall be canried on as a continuous openation I until placement of the panel or section is complete' D Maintain slabs in a moist condition for a period of at least five (5) days after I placement. I E Forms shall be sufficiently tight to prevent leakage of mortan and shall be propenly I br-aced to maintain position and shape ' F Forms shall be removed in a maxirnum of thr-ee (3) days ' on as soon as possilhe without damage or defacement of concrete. r 3.oz FtNlsH I I he carried on at such a rate that concrete is at all time plastic and flows readily in to the gpaces between the bans. Al I exterior exposed concnete sunfaces shall be broonr finished. All other areasshallbe steel tnowel finish, Use #5 tool at contnol joint. I 3.03 INSERTS, SLEEVES, ANCHORS I Build-in sleeves, conduit, etc, as indicated on the Dnawings or as furnished by I I I other trades, Set securely and level in forms before placeing concrete. I I END OF SECTION I I I ROUGH CARFENTRY I GENERAL I 1.0r DESCRrprroN tFoR GENERAL GuTDANcE - Nor ALL tNcLUSlvE)t A Work lncluded: New partitions, blocking and miscellaneous items noted or ' I shown on the Drawings; roofing, insulation, flashing, structural f naming' I siding and decking. r 1.02 SUALITY ASSURANCErr A Code: Comply with current locai building code' I B Workers: All Wonk to be accomplished by or unden the dir-ect on-site supen- I vision of journeymen carpenters experienced in similar work and familiar with code requirements for f raming. I I.O3 PRODUCT HANDLING I A Storage: Store matenials and equipment as directed by the Gener-al Contractor. I 2.01 WOOD I A Framing Lumber: Kiln dried and straight, mixed standard and constructlon' minimum f = 1100; timber tobe #2 rough sawn hemfir, minimum f = i250' I B Wall Sheathing: lf2'r exterior DFPA Fir' C Roof Sheathing: 1/2" CD exterior DFPA Fir' I D Floor Sheathing: 3/4tt T and G plywood' I E Siding and Exterior Door-: To match existing. Rough sawn spruce burned with I weed killer. - G Decking: 2x4all heart redwood. r z.oz wEATHERSH IELD I A Damppnoofing: Two (2) coats asphal tic dampproofing from below lowest slab I up to 6" below finish grade. I B Sheet Metal: 24 gauge galvanized iron (painted)' C Calking: Pecora 60+ unicrYlic. I D Roofing: Match existing. I PRODUCTS I ROUGII CARPENTRY 2.03 B INSULAT ION Wal l: Foil face, ful I thick Roof: Foil face, full htick Penimeter: StyrofoamRM batt, minimum batt, miminum 1-1 /2" x 24't , R=19. R=30. minimum R = 20. EXECUTION I I t I I I I I I I I I I I I I I I 3.01 B C FRAMING AND SHEATHING All workmanship shall be of the highest grade in every nespect, Framing shall be done in accondance with the accepted standards of genenal canpentry wot'k, with al I joints set square, plumb and straight. Funnish and install all wood nailers, furring, and othen fr-aming and rough woodwork as necessary to the propen construction and completion of the Wonk. Stagger sheathing joints. Nail at 6" o.c. at edges; and 8" o.c. at intenmediate supponts. Provide 1 x 4 cross bridging not over B'o,c. for all wood joists and 2 x solid blocking between joist at all supports' Match installation of exisling sheathing and trim. Notecontinuous vertical members. WEATHERSHIELD The dr-y-in roof along with 15# felt wall covering and metal flashings are to fonm a na in resistant barrier. Check weathershield system befor e covening to make sur-e moisture is conducted outside of building by drips, laps, conductons' etc. Repair all damaged spots with appropniate materials and laps prior to the app- licaiion of final finish materials' The l5 - pound dny-in roof felts should be appl ied as early as possible. Lap 6tt (double felts at hips, valleys' and nidges) wall felts lap 4" and should be applied immediately befone plaster on siding' Prionto apolying felts, apply gnace bituthene ice and watershield ag shown on detail and difficult to seal unexposed areas. Match lap and installation of existing roofing- D E 3-02 B (- E D I I I ."; '=::.::: I I I t END oF sECrloN I I I I I I I I I I I I ROUGH CARPENTRY 1 Fit insulation snugly between f naming, to maintain interity of insulation over entire anea to be insulated as much as possible. 2 Install faced insulation with integral vapor banrien toward wanm-in-winter side of assembly. I- ir il lr FINISH CARPENI-RY GENERAL I 1.OI DESCRIPTION (FOR GENERAL GUIDANCE - NOT ALL INCLUSIVE) I A Work lncluded: I 1 Wood base throughout, except at tile walls. 2 Doons, jambs and handwane' I 3 Window jambs and glazing and calking. I 4 Skylight. I 5 Cabinet work as shown. I 6 Miscellaneous wood trim.a 7 Minrors. I 1.02 SUALITY OF FINISH CARPENTRY I A Mi lling: All materials to be shaped and glued in an architectural woodwork I shoP' - B Qualifications of Installers: Cutting and fitting of trim and finish I by journeymen finish carpenters (may be assisted by apprentice canpenters)r who ane thoroughly trained and experienced in the skills nequired and who ane completeiy familiar with the materials involved. I C Rejectionl In the acceptance or rejection of finish carpentry, no allowance will be made for lack of skill on the part of workmen. t D AVrl I Premium Gnade Standards willbe followed. 1 ,03 QUAL ITY OF OTHER M,ATER I ALS t A lnstallers: I I All Work in this Section to be accomplished under dinect, on-sile supen- I vision of thonoughly trained and experienced journeymen who are completely familiar- with the nequirements of this Work and the recommendations contained in the neferenced standa rds. r 2 ln acceptance oI the finished work, allowance will not tre made for lack of ski ll on the part of the worker^s. r B Manufacturen's Recommendations: Manufacturenfs recommendations concerning both methods and maierials shall be strictly adhered to. r I I I I I I I t I I I I I trINISH CARPENTRY PRODUCTS I 2.01 FINISH CARPENTRY I A Exposed Wood: 3,/4t' oak veneer flat cut plywood, 3/4" sol id oak trim, Oak t to be mixed ned and white to match existing. r B Rough har dwane, adhesives, sand papen and other miscellaneous matenials I r-equined for completion of this Work. 2.02 WOOD DOORS I A Solid Wood Doors: 1-3/4" solid core wood, premium grade (AWl); sizes as shown on Drawinqs. Veneer shall be oak flat cut' t B See detail fon job-built exterior door. r C Wood Door Frames: Shall be oak. See existing fonsizes, thicknesses and profi le I of membens. Frame to same material as doon. I 1,04 GLAZING STANDARDS Follow pentinent recommendations contained in the "Manual of Glazingrr , FGMA. 1.05 PRODUCT HANDLING A Protection: Use all means necessary to protect the materials of this Section before, during and aften installation and topnotect the installed work and materials ol all other trades. B Replacements: In the event of damage, immediately make all repairs and re- placements necessary to the approval of the Architect and at no additional cost to the Ownen. 1.06 SUBMITTAL OF FINISH CARPENTRY A Samples: 1 Submit a sample of cabinet enclosure l'-0r' x B" x 4" deep with a door. 2 Get Architectrs appnoval of veneer plywood to be used for all exposed cabinet work . B Shop Drawings: Shal I be submitted to the Ar^chitect for neview on all cabinet work' C Shop Drawings shal I show in large scale the construction of the various pants of the Work, the methods, of joinery, the pr-ofi les of moldings, provisions for assembly and installation. They shall show methods of reinforcements, anchorage and supPort ' I I FINISI-I CARPENl-RY I 2.03 HARDWARE r A All hardware to match existing. I z.o4 GLAZTNG AND cALKtNGI A Glass: 1" banded insulating glass. I B Calking to be one part GE Silpruf 2000 series, on two parts Polyurethane Pecona Dynatrol 2; or approved altennate, I C Mirnors: f o be'l/4" silven backed. Installed with a clear silicone adhesives. I 2.05 SKYL IGHT I A Contractor to submit product for Architect approval. Shape to genenally be as shown on Dra wi ngs . t B Shop Drawings are required to show connections and flashings. I EXECUTION I 3.oi suRFAcE coNDlrloNS I A lnsoection: I ' :,;'il:'":l"}."JTi H;;?T:],',";T';'J"[:i'.:'-',i:,'fi:"ll'"0":i;u#."" this installation may properly commence. I 2 Verify that finish carpentry may be completed in strict accordance with the. original design and all pertinent codes and negulations. I 3 Verify that bui lding insulation may be installed in accondance with the oniginal design and the manufacturerts recommendat iorrs - I B Discrepancies: 1 ln the event of discrepancy, immediately notify the Architect. I 2 Do not oroceed with installation in areas of discnepancy unitl all such discnepancies have been fully resolved. I C Scheduling: I I Coordinate fabrication and installation with all other trades. Respect I and pnotect matenials of all other trades. I I I I I I I I I I I I t I I I I I I I t 3 .02 B /- A 3.04 B F INISH CARPtsNTRY WORKMAI.ISHIP OF FTNISH CARPENTRY General: All finish carpentny shall produce 1:oints, true, tight, and well nailed with al I members assembled in accordance with the Drawing. Jo int i ng: I Make all joint to conceal shrinkage; miter all exterior corners; cope all interior corners' miter or carf al I end-to-end joints' 2 lnstall all trim in pieces as long as possible, jointing only where solid support is obtained. Fastening: I Install al I items straight, true, level, plumb and fir mly anchor ed in place; wher.e blocking or backing is nequired, coordinate as necessary with olher tnades to ensune placement of all requined backing and blocking in a timely manner. 2 Nail trim with finish nails of pnoper dimension to hold the member firmly in place without splitting the wood. 3 Screw, do not drive, all wood screws' except that screws may be stanted by driving and then scnewed home. F INI SHING F I NI 5H CARPENTRY Sand papen all finished wood surfaces thoroughly as required to produce a uniformly smooth surface, al.ways sanding in the direction of the grain, except do not sind wood which is designed to be left nough; no coarse gr ained sand papen mark, hammen, mank, on other- impenfections will be accepted' WOOD DOORS Fabnicate all wood doons in strict accordance with the refenenced standards fon the grades specified and as detailed on the Drawings' I nstallation: 1 lnstall all wood doors for long life under hard use' 2 All handware on wood doors and frames shall be montised into edges, faces, etc, , neatly and with best wonkmanship' 3 Door shall be hung stnaight' true and plumb' 4 Provide proper tolerances for hardware, taking cane that space between wood daor and jamb is not in excess 1/16". Bevel strick edge of wood doors to achieve opening clearance. 5 Install fr ames plumb, rigid and in true alignment' I I I I t I I FINISH CARPENI'RY 6 Pre-drill wood door frames for finish nailing to minimize splitting. Do not set nail head on putty. All fnames shall have saw cut full length of piece on unexposed surfaces (KERF) to minimize wanpage. Let in all horizontal members into vertical 1/2" thickness of material , glue and nail. Ease all shanp edges slightly with sand paper. Loose stops and casings shall have all cornens mitered neatly. Touching-Up: 1 Using fine-grained sand paper, completely eliminate all scratches and abnasions in finished wood sunfaces. 2 Leave all finished wood surfaces ready for painting. HARDWARE Deliveries: Onder- and stockpile all items sufficiently in advance to ensure their availability and make all necessary delivenies in a timely mannen to ensure orderly progress of the tota I Work . Install all finish handwane in strict accondance with the manufactuners' recom- mendations, eliminating all hinge-bound conditions and makeing all items smoothly operating and firmly anchored into position. After har-dware selection, supply hacdware schedule to Architect fon review befor e orderi ng. Where possible, shop install cabinet hardware and adjust in the field' GLAZ ING lnstall glazing acconding to reference standards. Set all glass in a tnue plane, tight, and straight, with proper and adequate clearnace, f inmly anchoned to prevenl rattling and looseness, with all edges cleanly cut; do not nip or seam the edges . Mirror: Install with non exposed clear silicone adhesive. END OF SECTION a B B I I I I I I I I I I I t ? nq D 3.06 I I GYPSUM DRYWALL t GENERAL I I 1.01 DEScRlprtoN (FoR GENERAL GUtDANcE - NoT ALL lNcLUSlvE)r A Work Included: New walls and ceilings. I 1.OZ OUALITY ASSURANCE r A lnstallens: I ' I All Work in this Section to be accomplished under dinect, on-site super-t iiil;L:'Ji,x':il"TJ"l;:;'.'"iii;fi'".'i,'Tffi::ru":m*"*:.'."'Ti::''I tained in the reference standards. I 2 ln acceptance of the finished Wonk, allowance will not be made for lack of I skill on the Part of the workers. r B Manufacturen's Recommendationsr The manufactunersr recommended methods I of installation and test certification fon fi ne control shall be the basis for^r accemptance or nejection of actual installation methods used in this Wonk. I C Refenence Standard: The U.S. Gypsum Company "Gypsum Drywall Construction t Handbookt'. I 2.01 MANUFACTURER USG, Goldr Bond, Flintkote or appnoved alternate' I 2.02 MATER IALS I A Gypsum Wallboard: All interior gypsum panels shall be the pr'oduct of one (1) I manufactuner-, and shall be tapered edge for finished sunfaces and butt edge foc concealed sunfaces, 1/Ztt thick. Waten resistant wall board is required at toilet room walls. I B Trim: I 1 Metal Cornerbead for extenior corner edges (USG, Dur-a-Bead #101). I 2 Metal casing bead' concealed type (usc' #200 series)' I C Texture: Non-asbestos spray type, Anchitect to appnove sample' I I PRODUCTS I I GYPSUM DRYWALL I EXECUTION I 3.OI SURFACE CONDITIONSI A Inspection: I I Pr-ior to all Work of this Section, carefully inspect the installed work of all other trades 3nd verify that all such work is complete to the point ' where this installation may properly commence' t 2 Verifv that allstuds are plumb befone pnoceeding, as out-of-plumb walls after gypsum board installation will be the respondsibility (to correct) of the gYPsum board installers. Ir 3.02 tNSTALLATtoN oF GyPSUM BOARD I A Genenal: Install all panels plumb, level , and with all ventical joints on bearing. I B Cutting: Permanufacturerrsrecommendations. t C Fastening: I i Properly space all fasteners in carefull accordance with the manufacturerrs I recommendations and code requirements, with heads driven slightly below the surface for proper cementing, but without breaking the paper coven' I 2 Loosely butt all joints to be taped, lirmly butt all joints to be left untreated. I 3 Stagger all end joint an the joint between panels to achieve a maximum of bridging and a minimum of continued joints ' I 3.03 INSTALLATION OF METAL TRIM I A General: All.exposed edges and outside corners to have metal trim. 3.04 T.APING AND FINISHING t A General: The finish product shall be a smooih surface. The Contracton may opt to achieve this by the finishing operationsl i. e. , gypsum panels may have I some kinks if the final product is true and smooth' t - B Environmental Conditions: I ' I Contr-ol heating and ventilating during f inishing operations to ensure the maintenance of 55 degree F . minimum tempenature. I 2 Use minimum 200 watt light shining at an angle to wall surface during taping ooeration to assure smooth and minimal appearance of joints. I C Texture: Apply a light orange peal texture. I END OF SECTION I I I I'ILE AND i,4AREiLE GENERAL I I 1,01 DESCRIPTIoN (FoR GENERAL GUIDANCE - NOT ALL II{CLUSIVE)I A Work Included: Provide and install tile on walls and f loors indicated in the I Bathroom (see Finish Schedule). Pnovide and install marble in dressing and I closet . PRODUCTS I z.or MoRTAR AND cALKrrucI _ A Organic Adhesive: ANSI A 136.1 . Type ll. I E Bonding Agent: "Tile Bond" as f loor primer and in ;rdhesive and grout. r C All mar-ble joints shall be calked in latex. r z,oz T rLE I Latco Venetian Glass lulosaic Tile (3,/4" x 3/411) with !)ermabond bed and grout. t Three (3) colors will be selected and patterned. I 2.03 MARBLE I To be selected by Owner-. Marble shall be 3l4tt thi cV . EXECUTIONI t 3.01 INSPECT|ON I A Pr-ion to installation, inspect the work of other trade: to venify that work is I complete to a point wher-e application of the tile and r.rarble may properly com- mence, I B Coordinate installation of cabinets, electnical and plrrmbing.I 3 . 02 I NST ALLAT I Ol.l OF T I LE I A Follow methods as described in the Tile Council of A:nerica "Handbook f or- Ceramic Tile Installation". W231 (walls), B51l an<.i 514 (tub and shower) ' I B Install tile full height (f loor to ceiling) on shower snr:losuFe, and tub gurround. I I I I o t_t_ ANIJ M,\ l{ lJr. r_ I 3.03 INSTALLATION OF MARBLE - A lnstallation shall be by experienced expert craf tsmen- I B All marble shall be field measur ed and shop cut prior to installation. I C All holes shall be field measured and shop installed. I D Mechanical clips and louvers shall be shop installed' 3.04 CLEANING It A Upon completion of this Work, remove all excess materials and debris arising fnom this Work and leave the work and working area in a neat and'orderly condition to:the approval of the Archi tect. END OF SECTION I t I I I I I I I I I I I I I TtrA INT ING I GENERAL I I.01 DESCRIPTIoN (FoR GENERAL GUIDANCE _ NOT ALL INCLUSIVE)t A Wor-k Included: Painting of old and new sunfaces as indicated in 'rExecution" I in tfris Section. All surface prepanation and patch other than patching I required in Gypsum Drywall Section' I B Def inition: The term I'paint", as used henein, includes enamels, paints, I sealers, filler, emulsions, and other coatings, whether used as pr-ime, inter- mediate or finish coat. I 1.a? ouALtrY ASSuRANcEI A lnstallers: I I All work in the Section to be accomplished under direct, on-site super- vision of thonoughly tra ined and experienced journeymen who are completely farnilian with the nequirements of this Work and the recommendations con- I tained in the reference standands. 2 ln acceptance of the finished wonk, allowance will not be rnade for lack of skill on the part of the wonkens. I B Manufactunersr Recommendat ions: Manufacturers' recommendations concerning I both methods and maierials shall be strictly adhened to' I I.03 PRODUCT HANDLING A Delivery: All.paints and siiirilar materials must Lle delivered in the original container, with the seals unbroken and lable intact B Protectionl 1 Store mater-ials at the job site only in a suitable and designated area re- stricted to the stonage of paint materials and related equipment. 2 Use all means necessary to ensure the safe stonage and use of paint matenials and prompt and safe disposal of waste. C Touch-Up Supplies: At cornpletion of job, supply the Owner with one (1) marked gallon of each color and gloss useo. I t I I I I I I I I PA ltJl' I rnG I PRODUCIS 2 B AII I I I I 2.A1 PAINT MATERIALS Manufaclurer: All oaint materials strall be the Martin senoun Free Spirit Low Luster Latex Enamel . Oil Finish: lVatco Danish Oil Finish (natural). paint colors to be selected to match existing. EXECUTION B I I I I I T I I I t I I 3. 01 A 3.O2 r- SURFACE CONDITIONS Inspection: The Painting Contnactor shall be responsible for inspecting the work of others pnior to the applications of any paint or- fi nishing matenial ' lf any surface to be finished cannot be put to propen condition for finishing by customany cleaning' sanding, and the putty operations, the Painting Con- tractor shall immediately notify the General Contnactor in writing' or assume responsibility for and rectify any unsatisfactory finish resulting' D isc repa nc ies: 1 ln the event of discrepancy, immedialely notify the Anchitect ' 2 Do not proceed with instailation in areas of discrepancy until all such discnepancies have been fully resolved. PREPARAT I Of'l OF SURFACES' GENERAL protection: Pr-ior to all surface preparation and painting operations ' completely mask, remove, or otherwise adequately pr-otect all hardware, accessories, machined surfaces, plates, lighting fixtures, and similar items in contact with painted surfaces, but not scheduled to receive paint' Friming: Spot prime all metals which ane to be painted with emulsion paints' using a primer recommended Lry the manufacturer of the coating system' Cleaning: I Eiefore applying paint or other surface tneatment, thoroughly clean all surfaces involved ' 2 Adjacent surfaces and floons are to be free of loose dirt and dust during painring and drYing Peniod. 3 Sjchedule all cleaning and painting so that dust and other contarninants ft-om the cleaning process will not fall on wel , newly painted sunfaces' tr' a I I I I I I I I I I I t I I I I I I I 3.03 A 3.04 PA II{T II{G PREFARATION OF METAL SURFACES As recommended bY manufacturer ' FAINT APPLICATION General: 1 Paint all surfacest except.glass' ma:lry ' and similar iiems' not pre-finished and not calied out as unfinished' 2 Paint all gnilles and other pne-finished items where the factory pre-finish is not in u""otout'"I ;;;;'il; Fainting Schedule and color selection' 3 Finished surfaceg to be uniform in color t texture and sheen' Envi ronmental Condi tions: 1 Comply with the manufactunen's recommendations as to enviconmental con- ditions under which the coating systems may be appl ied' 2A||materialstooeappliedunderadequatei||imination. Moi stur-e Content: r Use a moisture rneten approved by the Architect to test surfaces' 2 Danot apply the initial coating until moisture rneter reading is within limits recommended by the paint materials nranufacturen' Defects:Sandanddustbetweencoatsto|emovea|ldefectsvisib|etotheun_ uil.a uy" from a distanc of five feet' INSPECT ION General: Do not apply additiolaf 33at1 until completed sampl.e coat has been inspected.na upp"oJui Oo tr't Anchitect' ii"t"t to 1'03-A above') REINSTALLATION OF REMOVED ITEMS Following completion of painting in each spacet qromptly r^einstall all items nemoved for painting, using only workmen-Jkilied in the particular tnade' CLEANING UP General: D 3.05 J.UO 3.07 A 1 During Progress tainers or other that PurPose ' of the Work, do not allow the accumulation of empty con- eXcessitemsexceptinareasspecificallysetasidefor 2 Prevent accidental spilling of .paint matei rals and' in the event of such spi ll' immediate|y""*ou"ll.|..oiruamateria|sandthewasteorotherequipment usedtocleanuptf'espifi'andwashtft"suniacetorheinoriginalundamaged condition, alt at no adii tional cost to the Owner' i' ll I I I I I I t I I I PA INT ING I B Pnior to Final Inspection: Upon completion of this pontion of the l,Vonk visually I inspect all surfaces and remove all paint and traces of paint forin sunfaces not scheduled to be Painted. I 3.09 PArNT rNG scHEDuLEI A Natural Wood Finish: All natural wood and plywood unless othenwise noted. '| New Wood: a Back prime all trim and doon jambs. b Two (2) coats Watco Danish Oil Natural f inish in strict accondance with maufacturerts instnuction. (Wipe well between coats.) B Gypsum Board, Low Luster Finish: All exposed gypsum board. I Prime coat (tinted). 2 One (l) finistr coat, Free Spirit Low Luster latex enamet . C Pa rt ic leboa nd (Unexposed). 1 P n irne coat. 2 One (1) finish coat, Free Spirit Low Lusten Latex Enamel. D Exterior Steel and Inon: 1 Wash G.l. with wanm vinegan water. 2 One (1)of chromatic metal primer (if not pre-primed ). 3 Two(2) coats semi-gloss exterior oil base enamel . E EXTERIOR TRIM A Olympic Stain #71 I to match existing. I END oF sECrloN I I I I I l I EAU IPMFNT GENERAL I r.0r FuRNtsH AND TNSTALL THE FoLLowtNG: I A Electnic Cooktop: Modern Maid ET-350 built in four (4) burner cooktop. ' Brushed chrome finish. B Gass Cooktop: Modern Main KGT-341 bui lt in two (2) bunner cooktop. Brushed chrome f inish. r C Vent Hood: Broan ducted model 1420. Black glass and aluminum trim. I D Oven: Thermador model CMT 21. Micro thermal oven. I I I I I I I I t I I I I END OF SECTION 1 MECI]ANC IAL GENERAL 1 .01 DESCRIPTION (FOR GENERAL Work Included: lnstall Plumbing orilles and thermal insulation as GUIDANCE _ NOT ALL INCLUSIVE) f ixtures, fittings, heating elements, contnol , indicaled on the Drawings - PRODUCTS I I I I I I I I I I I I l I I I I I I z.a1 A PLUMBING Provide matenials r-equired for the proper inslallation of the following fixtures: 1 Bathtub Fittings: Kohler K6B?4 with showenhead. Stainless steel pop-up drain to be selected bY Architect' 2 ToiIet: Koh|en San Raphae| K-3395-EB with white seat and cover. 3 Bathroom Lav: Elkay Lustertone RLR-12, LK-'l dnain fitting' 4LavFittings:Kohler-TritonllK-T40ST,notailpieceordrain' 5 Kitchen Sink: Elkay LUstertone LMR-3322-C (see fittings beiow)' 6 Sink Fittings: lnstitutional LK431/SPGN?'A/AE-25/BH=4' 7 Garbage Disposal: ElkaY LKD-60' Fixture colons to be selected by Owner' HEAT ING Provide materials required for the pnoper installation of heating and exhaust system, contnols and gri lles. B 2.OZ EXECUTION 3.01 PLUMBING INSTALLATION lnstall and secure all fixtures per as indicated on the Drawings ' All and floors or countertoPs and form Stop valves shall be furnished and Soi I and Waste Lines. Branch lines shall have aminimum fall placed a nrinimum of 5'-0" o 'c ' code, manufacturers necommendations and fixtunes shall be secure and tight to walls a sound installation. insta I led at all fixtures' B of 1 inch per 4 feet. Hangers shall be t MECHAN ICAL I I Each fixture shall be vented in accordance with sound plumbing pnactice and I appl icable codes ot vent stack through the roof. Make every effort to tie to - existing wast and supply vents and lines. I D Clean outs: I Ful I size brass cleanout plugs shall be installed at the base of each drain and I waste niser and stack and wherever pipes change dinection or othenwise nequire I I cleanouts for poper cleaning of entine drainage system. r E Piping: I Soil pipe shall be standard weight cast iron bell and spigot with lead and oakum jo ints , I Waten piping shall be hard drawn copper with brass fittings and soldered connections. t 3.02 HEAT ING A Contnactor is to move furnace, hot water heaten to new location shown on I the Dr^awings.t B Contractor to submit to Architect for review (and approval befone starting work) I a sketch and written discription of wonk proposed to heat the new addi tion. t C Contr^actor shall opt between an electnic baseboard system or extending the r existing forced air system. - D New system shall pnovide adequate heat to supply in the space 72o F temperatuFe with an outside temperature of -140 F. I E Contractor to also pnopose system for toilet exhaust and kitchen venthood. I END OF SECTION I I I I I t L I I I ELECTR ICAL GENERAL I r.0r DESCRrprtoN (FoR GENERAL DUTDANCE - Nor ALL rNcLusrvE)I _ A Work of this Division shall include furnishing all labor, equipment, supplies and materials necessary for the installation of all electrical systems shown on the I Drawings. B All electrical work shall be done in accordance with local and National Electrical I Code. C Contnactor- shall ar nange and pay for all permits, fees and taxes. I D All materials, equipment, and devices shall be new and appnoved by Under^wniters :aboratories, lnc. I 1 .O2 SUMBTTTALS r A Submit a wnitten description of pnoposed panel box circuitry and if new panel , I its connection to the existing senvice. PRODUCTST I I I I 2.01 MATER I ALS A Supply the following fixtures and all necessary items for their insta{lation and operations according to NEC codes. B Light Fixtures: To be selected, include in bid an allowance of $2,600.00 for purchase of lights. C Cover plates and switching devices to match existing. EXECUTION I 3.01 rt{sTALLAT roN I A Install all devices as recommended by manufacturer and according to code. B Gang all switches and receptacles whenever possible- C Switches at + 40" unless noted otherwise (to centeni ine). D Receptacles at + 18r' unless noted otherwise (to center line).I T I I I I ELEC TR ICAL E Completely install entire electrical systern as indicated. Furnish and install minor items ornitted but obviously necessary for a complete job. Provide temporary electnical service and distribution. Remove temponay wiring upon completion of the job. G Verify senvice location with local utility company. H Good wonkmanship and appearance are considered of equal importance with electrical and mechanical operati on. I Provide all cutting and patching necessary fon electrical work; arrange with Contractor for necessary openings and chases. I I I I I I I I I I I I I I I I J Provide trenching and backfilling requi r-ed for own work. Backf ill in accordance with Soecif ications. K Pnovide all nraterials which ane new, first quality, and approved by Underwr^iters Laboratories, Inc. Replace and pay for matenials and equipment damaged during course of installation. Substitute materials and equipment must be appnoved by Architect . L Test entine electrical svstem prior to completion of work. Show that all equipment is in good openating orden. M Provide Owner with guarantee that materials and wonkmanship are free from defects for one (1) year from date of acceptance of work. N Pnovide a complete overall wiring system. Conceal all wiring runs. 1 Provide rigid galvanized conduit whene exposed to the weather and for- enclosing main grounding conductor ' 2 Pnovide flexible conduit for f inal coritlections to motors and recessed fixtures. Use liquid-tight flexible where exposed to weather or in wet locations. 3 Where nequired by local code, provide EMT for runs in walls and ceilings and where exposed to dry areas. Do not install in floor slab which is in contact with the ground. 4 Provide PVC conduits for nuns in on unden ground f loon slab and whene buried in earth. Provide PVC conduits which are heavy wall, Schedule 40, (90 degrees Centigrade (EPC) and U 'L. listed. 5 Provide appr-oved couplings and connectors for all conduit naceways- Make all joints t ight. 6 Non-metallic shielded cable may be used where permitted by local code' I ELECTR iCAL I t O Coor^dinate locations of outlets and electrical equipment with that of other t crafts so that electrical equipment is not blocked, inaccessible or inopenable. Provide outlet boxes minimum size #14 AWG. Pnovide Type THHN conductors when circuit is near noof deck or in noof insulation. Feeders #6 and larger I shall be 600 volt, TYPe THW. P Funnish and install all lishting fixtunes and lamps, and supponts as required. I All ballasts shall be ETL/CBM certif ied, supen iow heat, pnotective devices, a I Advance Mark ltl, energy saver, full light output, or an equivalent ballast as manufactuned by Jefferson or Universal . t o 5;i[fl:Hffi:"1: "",i'.;rui:i"["r1:lJ"T';""'#';*;"i:',jffi:.tisconnect I END OF SECT IOI{t I I I I I I I I t I I J {t- UJ LT IP N II- Ztu.t ?Lr-a< I I I o .7_J v l'-{ (\r{ ! rL!-^[1i/ 1J- ^{ 'oH: vl?- qN ur .u' QJ ',r X/.\Li\) -A 1DJe;E,^ ofr *hfi d (a <. Ot tlft F-.t !r-r 3Mtr tI "s[ tr E \rj 7 F. cnri )J rxd{tul :ytd=v 6'rlF -o*314!q ut F v c\) Xy 'P'st \) 4 F ti- J _J ; =lll2 l-- c\ rY )) 4 ,(\z, a!l ) 4 \tz tr 9-x lrl I I I I I I I I I I t I I ,r ,t t $YL"Q Atu x -'@ 24" o,a. t I I I I 2. 0 6 7. tt) o Y u UJ a) UJI *4'< g tG" a,c,HORIZONITAL *4'+ @ lo" o.c . \r, E r<T lcA L -te I-r I *r'. * \'l_d' ?<2\r,/EL:3e 24"o.c t I -(rf KEYE?J At,!T , l'- A"I i'-(. aa 9TONa Letr&. F2"d r.u*tlo" @ 44" o,c,* I I LE =L5 ?ou<.E;> <.-::-)r{-- \\/ ,\ | | -\r: -- -<-.r= r'fJe_ |FoF< R.E r l-.-l F= . - r<gv EP - iq )i u-i -.4 | r- /4 v\vlr-\t-:<Qow=-t-3 ,, @ 44" o,<=, i i I t foof innn I tro f.J \J \r | \-,,. ,^1+\llplcce woll \-,1 ln\J ll I tt TYr .5TE.Fz/Ax - t' FO<)\ IF-JG I I I I I I I t I I I I I I I I I I I 3lFA?3Ot.J:F:6 44 F -51 E5A5E FOK BEAN/4 ot€ t-^lFlhJGRAPE -- (4)oE * [s' tat'Q ?teK \,/ERT v'7 .,t 3 -T.lE9 e' l&" o.c' (3)tr4 . €A \^/a\ oorT, pier ond footing a o 6' DtI 'n$76higo ild_<nll Jx* I H ir-s I r 7. tlJ ) u17 ti ltr 5ur< r^t' n ls, rVU 60 +I il F fi T r'l h-)a- o v "f, ul dt..i uHurtloYxlel i o <r!ilnY2 aul?n ,O;)(A;Ih* ltJ { M-) M tll t-u 4r r0 J Jf rfi 1l- :rI-t{ 0l i$, 0.' l0t7. .d T fr:E :n t u Iti[r$ ili tL$*tl -, \\t s*fribs.H I I I I I I I I I t I I I I t I I I I u t'r 0 rll J z NT {Pl I oI [* ooD 5|D1NA .< _ FeuTS I=iIFELTS {-METAL €TgP FLAs}tIh-JG 6I.l-UI:T{EFIE PLYvdooo Ir* I It--\ Ye' 2t' fiaAMltrlC2 /vr-sp€7 Fetrs)t' tr6," oN llcrRrzoilTaLf I'..6'DP VEF:TICAL f St NGLe 3 oJtDe sHesT)- I l,1 { & rI I u D IJ 3tudNhauru 0 o ]>J l'- t'!.x td' z -o ($ I fuJ o {t N bJfr o ,or rl u |- n 6 I;I a I I I I t fi { It tlx (t Ud f t',. !s-_ tl o b Frnt lrr 0o til ill il!i u{ IJ u U ]A I I I I I I I t Zo' o.c. lhJ [rJAl-[- uJ€eP rcu€s ?'6lL. F1EUD STANE-fO MAT6H FX lSTrt...lc, ?AOE. IFJ R-A6€\"r- cor{6 ++@ 32oo,e: re€ PEall.ltu(z ceelue W.Q 4U 5rTE.D€AINg;o PE v) f oeAD€ n*a CONTEoL JOINttTs AA CAIL OUT ON SLIEET I ?&"o'c ' ! . L -i-- - - r ,l Att 1l l 't-o" MAx. t^$Ll- AbT,TVOT-1i) g€ vEelFtgD t,J f ^eAt-i rT€Cil- rN -ruEi Fi€LD. 2Y'4 €.€Dudc:c> UtrART (^JOOD DECK {" C.oxlt.- SLAB 10 oo ) > T€tM fc> DgE L^)IUDOtJ gAtg u-,e. l-.llN6€s To MAIZ,A trlNl5i-{ oF 8eL6 AJJ-' gfq" ffio oxv-, PL{uJOo O Q/ *u;D OAV- 2 X MllElesE>,Sue€.ouNP \ (sru.ne A6 CAB'NETS ) 11 ex. wp TtrtM () , \r.\ . .\ t utvr.-r,v urrtDE TPtV.,-----+-/ ,-GvP BD. i:i\.;7: -;: k"*o-.o*!lo"e 24" o'al- GVe ea I t I I I I I I I I I I I I I I I I I J- I il{t 'lflrl 'l i I -f* :I nn -: ilJ +--l *4'+ 4 16tlvE r<Tt €At- 2 J- 0 rr) ooI I I il--a' I lll' ; rsll I tre" i r I I Anu"uoI' l. ,/ lL2-f r r- r.-_--: r '- ' lSoF€tT I lF:=:-*?t F-."--....=_'1:F::=:=F a / vENrHooP-J I \ Ar>L_usro-B-e ..-1-oY.!-, -=?*:* I I I I A.DJ. 3{ELVFS ' crv P 6P RA:>TIC LAM. t, I' \ Lrrclc>D PALJ€L- tl I t I Ir T n I I l3 CTRTIFICATF r::Sllfqr /-.- -\ r: eriliiruc ernrunn - : T;,lof fr.tt:: tfllCt i rri CEIITIFNCATE OF OCCUPAruCY NUMBER. OF OWELLING UN ITS FT. rN HETGHT ANo sHALL coNFoRM ttf ccxsrRl:rrox BASEMEI{T WALLS OR FOUNDATION o U) "6.r .ct z 'oo z rt L o $ (n (D a r-t fi (D z ,J "o(D z .= .-l 5n -:!r Z z':=x xJ 3 F> E- F!.r . a Z, -t!) zr -Y'..* ;. I C ...'. a i'* c >-i o r-1 o >. I I 1 : : tr I .o z oo F-t o t- I t BUITDING DIVISION OF EAGLE COUNW; P.o. BOX 789 couRTHousE, EAGLE, CO.-PH. (3O3) 328.6339 DATE o""r,"on, Vern Tator Construction pERMrr ro Add f ron t porch (__t sroRy(TYFE oF tMPRovEMENT)NO. BUILDING PERMIT Hay 19 0968 AD DRESS ( !1o,,( 9TR EE T)(coNTR'3 LICENSE) NUMBER OF DWELLING UI{ITS (PROFOSED U3E) ZON INGAr (LocArroN) l40t Lionsridqe Loop DrsrRrcr_(NO.) (3TFEET) Giilsi:r nEeo- BETIvEEN AND (CROSS STREET)g ILo o D oz: v. .ot 4 ".o.* - "t?J. suB0lv 15 roN BUILDING IS FT. IT{ HEIGHT ANO SHALL CONFORM IN TO TYPE TO BE - FT, WIDE BY - FT. LONG BY USE GROUP BASEMENT WALLS OR FOUNDAT IOh REMARKS: AREA OR VOLU ME (CUBIC/SQUAFE FEET} OWNER Rlchard Hart l40l Lionsridqe Loop. Va EsrrMArED cosr $ A,noo.oo FEE"'t g 5t,5o bc compleled by anthorized ogent of orvncr) BUI LD ING ADDRESS (Afliddvif on ievcire ddc of opplicotion fo EAGLE FINAL: Review couNTY BUt LfrPERMIT AppLt cATt oN C/O INSPECTION, LANDSCAPE INSPECTION FORM RoutingForm ( ) PrimaryRouting ( ) Rerouting Permit No. -7. '(-?{ Date Ref erred - \/ .,---., r'L/o ne H/,1. qJ2 2 /./ A.Location ' Plannirrg Commission File No. Review and return to the County Buildirg Official within 6 working days Applicant Planning: Complies with: Subdivi sion Regul ations Zoning Regulations Site Plan (Landscaping) Commerrts: Reviewed by: Recommend Approval : No Htrn Yes HtrF Date: County Engineer: Roads Grading Drainage Comments: Recommend Approval : unn tr Inn tr County Health: Water Sanitation Perc. test 6E Recommend Approvat U- Final Inspection: C/O Recommend Approval Comments: DN Firral Inspection: Landscapi Recommend Approval Commerrts: ng!n C,/o lssued Final Filing Date by Date EAGLE DuNTY Eogle, Colorodo OFFICIAL RECEIPT REcETvED . .^. oate 7lL?' t( , rc7Y or >)-.*,,-4"nn O*;t-.;t**-t CASH ITEM Bu ildinq Permit Fee Application For Su bd ivision A lication Zone Chan Conditional Use Specia I Use Va ria nce Appeal Fee Code: (Building (Zoning) (Su bd ivision) Total Received All items are received for no-payment of any item. Ne 353? AMOUNT JO collection only and this receipt shall be cancelled tor Iar'i ING TAPPL,#'*I BUILD Juridiction Applicant to complete numbered Epaces only. PLAN CHECK VALIDATION Rq #sss7 WHEN PROPERLY VALIDATED IN THIS SPACEI THIS IS YOUB P€RMIT PERMIT VALIDATION : I oE3Ct.1f$.e ^ttoc*ro ""..r1L4 MArL ^OOtEst Uo,, cor{ lF ac To i f 7, ARCHITECI OR DESICI{Eh LICENSE NO. MA tl aootE!s ICENSE NO, L ENo5.&-\ , ,6 ' g** /. "/ //o, . 'u"""ff.o -l Q. 8 CIASSOf WOrK: I NEW EifiOOITION O ALTERATION O REPAIR tr MOVE D REMOVE L { l0 Change of use lrom 1l Vaf uation of work: $ L _ OO D PERMIT FEE SPECIAL CONDITIONS: Size ol Bldg. (Totall sq. Ft. Fire Sprinkleas Requirea [y". f]p6APPIICATION ACCEPTEO BY:PLANS CHECKEO 8Y APPROVEO FOA ISSUANCE 8Y No. ot Dwelllng Unlts OFFSTREET PARKING SPACES: NOT ICE SEPARATE PERMITS ARE REOUIREO FOR ELECTRTCAL, PLUMB. ING, HEATING, VENTILATING OR AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTBUC-TION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS, ORIF CONSTRUCTION OR WORK IS SUSPENDED ON NAEruOOruCOFOR A PERIOD OF 12O DAYS AT ANY TIME AFTEB WOHK IS COMM ENCED. r_ !1ERFgY CERT|F\/ THAT I HAVE REAO ANO EXAMTNEO TH|S 4PP LLC-4T !O-N AND KNOW THE SAME TO BE TRUE nruO CO-nneCl.A.!L pRovrstoNs oF LAws ANo oRDtNANCES covEENtNG THtsIy?E_.9F -w-oB11 !ry1!L BE coMpLtEo wrrH wnErxen spEcrrreo b_EB-Erfi oB Ngtr-IrHE GRANTTNG OF *. pERMtT DOEs NOTIIE.REIN (JI{ N9'. IIHE GRANTING OF A PERMIT DOES NpFqiuME To FvErlAUrHoRtry ro y'toLATE on ca-N-cEL r?B9v!sl'!+ts 9F Ar\|v orHER srATE-ar(tocAL LAw CEGttArlTHE PE R!']RMANCIE /OF CONSTRJ'CTI 5 | ONATU RE Of -tttN TiAC tOt Oi Au HEALTH DEPT. FIRE OEPT, 5OI L REPORT OTHER (Speclly) Form 1OO.1 1.r/INSPECIOR E-C'# t."ii-? --a/" BUILDING PERAAIT APPLICATION ABpticant to complete numbered spaces only. (DsEE ArracHEo sHEET) MA IL DDiESS LICENgE NO. ARCH IIECT Oi O€5IGN€i LICENSE NO. Llc€r!5E 110 . o usE or BUt tDlr{ 6 I 8 ClassoIworK: trNEW DADDITION trALTERATION trREPAIR f]MOVE IREMOVE I Describe work: l0 Change of use lrom 1l Valuation of work: $ , -' - ) PLAN CHECK FEE PERMIT FEE SPECIAL CONDITIONS: Size ol Bldg. (Totar) Sq. Ft. No. of St ories Fire Sprinklers Required !ys. [N.APPLlCAT]OAI ACCEPTEO 8Y APPROVED fOF ISSUANCE BY No. of Dwetlin9 Un its OFFS TREEI PARKING SPACES. NOT IC E SEPARATE PERMITS ARE REOUIRED FOR ELECTRICAL, PLUMB. ING, HEATING, VENTILATING OB AIR CONDITIONING. THIS PERMIT BECOMES NULL AND VOtD IF WORK OR CONSTRUC-TION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS, ORIF CONSTRUCTION OB WORK IS SUSPENDED OR ABANDONEDFOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS COIIIMENCED. I HEREBY CERTIFY THAT I HAVE REAO AND EXAMINED THIS SPPLICATTON AND KNOW TBE SAME TO BE TRUE ANO CORRECT.ALL PROVISIONS OF LAWS ANO ORDINANCES GOVERNING THISTy?E oF woRK wtLL BE coMpltED wtrH WHETHER spECtFtEDH.EREIN OR NOT. THE GRANTING OF A PERMIT OOES NOT ?FESUITE To crvE AUTHoRtry ro vrou,ri on callcEl rHE?Bgylsrorys oF ANrr orHER srATE oR LocAL LAW neour-Arlr,+cCONSTRUCTION OR THE PERFORMANCE OF CONS-CUtTION. SiCNATI]iE OI CONTRAC-rOR OR UTHOFIZEO ACEN'T (DA'E} FI RE DEPT. SO IL REPORT OTHER (Speclfy) PLAN CHECK VALIDATION WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT PERMIT VALIDATION E(TRA COPYForm I OO.1 177 M.O. l-y'P r.N\ .r ^FN{ 'T= / L ION S RIDGE SUBDIVISION FI L ING EAG LE B r! ^ rr .\ r- |i"'-\ l-(. t_, l-_ L_t-. "'""' (o,- \JA NO. 2 COU NTY CO LORADO SCALE 1'=5C." O _ PIN FOUND \ \ t'ai ,41 \\ I, TiILLI;.)1 E. ,"itl.:F-IitlD, il5 ING A REGISTEiIED LAND SUii.VEYOR. IN rt ts s'ti,'lc oi' ccr,(i:r.',DJ, oo ui':;r:-:gv cg.t'I'rFy 'i'rlA'r A su:iviiy it*s }.IADE'ilY i:8.\ilD U)iDrltt ilY Stit'l:lllVlSlO:t Ol'LOT 4 LIOIiS RIDGE StiBi)IVJSIOIT FILIIlC ilo. ?-, COijN'lY OII .5Ul1i'iiT, SI'i:rri O!' COLO;1i'DO, .'iND I"OUND 'i;;ii '1"1O S'.fOrlY i'il..q::i.l ilUIi,l)1ilG'rO Dii LOC,,'f]jD t:r'i'Tlt:tLY:'tITllfN Tllll llOU);D..iiY LINiiS c;L: 1'llli ,''BOVii DUSC.lIB:'lD PII,OPlt.t'fY. 'I'ilti LOC.iTION iillD DII'lSNSlOliS OF ALL BUILDIl;cs, L1lPi{Ovill.iEii'l'S, E,\Sti:;jli IS ;'lID ir.ICil'IS OP "lAY I}i iiVIDE};CE oit Kl:o;]i{ 'fo }ifi,';UiD.uilcto,'1cilt:it)i'ls BY o:l o{ 'litF; PREI'l isns .iiiE }'ccui{.:'I'rLY SilO;ill 'fO TilI 3iiS'i' Oir I'iY Ii.NOh'l.UDCli i".i.r(Tj .1J itiiltE SU't t,i:D )iO f'ENCFIS lICiiE l,OC;''f;;i1r)i D'C'r'irlijrr 20' Lelz rnor'r{'?F.!((f-*il#-fiff {i.,,;n \.tXt"",;...,r.9(# \'/ai,:r::nlii\Y' ra"w ,/,/ \../ \ \ TWO sTORY \ FRAME SUII-OINE \9/'$. 14 \ s'o {,t/3ot._--.-.--ud \\, \.\ \a\ \1\ 'rIfl \o_ \ \ .Z-- wooden GARAGE p porch 9- si_5,- \€.:;d 64 'fireplace (2.o'x 4.o')4? 7- LOT 4 SoYo \\ \\ \\ \ {' v v 1;,:rfir rr 0,:E 'BUILDING DIVISION P. O. BOX 179 PHONE:328-6339 rNseecrGru EAGLE COU FIEClUEST. NTY DATE JOB NAME TIME RECEIVED- AM PM CALLER E orHen MON COMMENTS: TUE f]panlnl.LOCATION READY FOR INSPECTI ON WED THUR FRI AM PM I nppRovED ! uporu rne CORRECTIONS Ll DTSAPPROVED FOLLOWING CORR ECTIONS: ! nerNsPEcr DATE IN SPE CTO R tgr trl[, vlul{tt Et lffiItslgnl, t slllot rylfryt RECEMEff!h lt'. I Frr Dbt ftt JUt I s B7s Depl. al p,.n o1pL--.. 7 v4-<- {/U IG'I' P. IJUT3FU,>" ,ffi*l%rrlIEII EDr G(|ISIT|I tnu'L^ /?tu4'l rlfir illnr, cort8iDltrt t./ - C I /Kn,-*" ) &!r,fu 11f --'-- Illr ffil'rti|c|, cG.tlfi -tt [lfi Js llr lg?0 o+rr &[dl!f D0rtcr ry. W // INSF'EC NtTrcl FIEOUEST OUNTY JOB NAME TIME RECEIVED- AM PM CALLER II go' ,tN$ SHE BOOF .a.,:,lrAL.- loN eleci"tce,, ttr*'t*" " FrNoa wDcs. PARTIAL : n ornen n pnnrrnl.LOCATI ON READY FOR INSPECTION MON COMMENTS: TH UR AM PMTUE,.;;-E-r .,.'wED -ll./ FRI El,AppRovED I uporu rne CORRECTIONS LIDISAPPROVED FOLLOWING CORRECTIONS: LJ REINSPECT s1i' DATE INSPECTOR t 0')"''' ':'' '. INSPECTTctN FtEEUEST.-BUILDING DIVISION P. O. BOX 179 PHONE:328-6339 -- 1"q ,t -- .' l"'DATE t- t' .:'\' ,JOB NAME TfME REcEf vED- AM pM c^LLEa L,/:0--4.1."J I orHen MON GOMMENTS: I pnnrrnl. LocATroN READY FOR INSPECTION THUR (:-' -t' AM PM El'{pp RovE D D otsappRovED ! nrrNSPEcr fl uporu rHE FoLLowrNG coRRECTToNS: CORRECTIONS I ,-t ' .t^t INSPECTORL DATE