Bill Gibson
Tuesday, September 27, 20LL L:44 PM
'McCutcheon, Darwin'
RE: 1415 Lions Ridge Loop, Lot 4 Filing 2
20]-1.0927 L3322 s9 s 5. p df
Hey Darwin,
The existing garage was constructed prior to 1972 (see attached land survey) under Eagle County jurisdiction. The
subject property was annexed into the Town of Vail on August 15, 1979 through Ordinance No. 29, Series of 1979. The
existing garage is therefore legally non-conforming and may continue subject to the provisions of Chapter 12-L8,
Nonconforming Sites, Uses, Structures, and Site lmprovements, Vail Town Code.
Sincerely,
Bitl
BillGibson, AICP
Town Planner
Community Development
T0nt 0F t/Af
970.479.2173
970.479-2452 fax
vailgov.com
twitter.comivailgov
cri]ivff,ll&rr'r l
From : McCutcheon, Dan rin [maiho:darwin@fsir.biz]
Sent Tuesday, September 27,2:OLI 12:01 PM
To: Bill Gibson
SubJec$ 1415 Lions Ridge Loop, Lot 4 Filing 2
Hi Bill, I hope all is well for you today.
Sir, as per my voice mail, the architectural report suggested there is a current set back violation a couple other
minor violations that have been OK (to date) on this property (1415 Lions Ridge Loop, Lot 4 Filing 2) but we
would like to see about getting a letter which effectively grandfathers those issues so he doesn't get a tap on the
shoulder telling him that he needs to tear down his garage and move it back to conform with today's official set
back regulations.
l
Sir, are you the right person ro ,otr,rt* or is there somebody else that , ,rtio be tatking to so we can obtain
a letter like this? How long does it normally take to receive a letter like this? Bill, I need to know that time
period since I will have to try and obtain an amend extend on the due diligence period for the purchase conkact.
Thank you for you time and we would appreciate a quick response if possible.
Best regards,
Darwin
Darwin T, McCutcheon
Forbes Sotheby's Intemational Realty
dmwin@fsir.biz
970-845-0400 OfIice
970-748-5102Direct
970-306-7102 Mobile
fiJl L"+ vrsku,L;"eftJa
€1,1L
AlpRBn H. axo Susau Wl-r-rRus
POBox 18420
AvoN, CO 81620
November 17,2006
Iown of Voil
Design Review Boord
Deportmenf of Community Development
75 South Frontoge Rood
Voil. CO 81557
ATTENTION: WARREN CAMPBELL
RE: Alfred H & Suson Willioms
l40l Lions Ridge Loop, Voil
DRB Number: DR8060384 ond DRB060268
Good Morning,
Regording the obove listed DRB reference numbers wherein removol ond replonting of certoin
lrees wos colled for by lhe Design Review Boord on the subject property, it is respectfully
requesled lhol on extension of lime be gronted lo replont ihe trees on the property during the
plonting seoson by Moy 31 ,2OO7. Enclosed herein you will find o copy of the DRB Action forms for
your perusol. lt is believed thot ot this point, oltempting lo plont replocemenl trees would not be
beneficiol lo the trees os they would probobly nof be oble to survive ihe tronsplont, esfoblished
themselves ond endure the winter conditions.
Thonking you for your considerotion, I om
Rnry,'(.$]f
eo'$,
Enc.: DRB Aclion Forms
ocen*$$Y EvEloPt{l,fi
Design Review
ACTION FOR}I
Department of Cornmunity Oevelopment
75 South Frontage Road, Vail, Colorado 81657
tel:970.479.2!.39 fax:970.479.2452
web: www,vai[g{rr.com
o
Boad
Project Namer MLLIAMS RES. CHANGE
Prciect Descripuon:
Participants:
DRB Number: DRB060384
Application to remove one aspen, modifry the existing deck, replace a window and repalce stone
with siding.
owNER MLLIAMS, ALFRED H. & SUZAN 0812212006
PO BOX 18420
AVON
co 81620
ARCHITECT VICTOR MARK DONALDSON ARCHIT0S | 2Zl 2006 Phone: 970-949-5200
OO48 BEAVER CREEK BLVD, STE 207
PO BOX 5300
AVON
co 81620
License: C000002070
APPUCANT VICTORMARK DONALDSON ARCHITE0S/222006 Phone: 949-5200
ProjectAddress: 1401 LIONS RIDGE LP VAIL
1401 UONSRIDGE LOOP
Location:
Legal Description: Lot 4 Block: 3 Subdivision: LION'S RIDGE FIL. 2
Parcel Number: 2103-122-0200-6
Commentsr SeeConditions
Motion By:
Second Byr
Vote3
Conditionsr
BOARD/STAFF ACTION
Action: STAFFAPR
Date of Approval: 09/06/2006
Cond: I
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond:0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval.
Cond: 202
Approval of this project shall lapse and become void one (1) year following the date
of final approval, unless a building permit is issued and construction is commenced
anO is oitigilty pursued toward compleuon.
Cond: CON0008391
Ttrc applicant shall repace all removed aspens with an equal number of new aspens on
the site which have a minimum caliper of 2.5 inches, prior to May 31, 2007.
Warren Campbell DRB Fee Paid: S20.00
OCI'lfir{TY IE\,ELOP|,€X'
o
Design Revierv Board
ACTIOI{ FORM
Department of community Development
75 Sorth F ontage Road, Vail, Colorado 81657
tel: 970.479.2139 tax: 97o.479.2452
web: www.vailgov.com
Application to remove one aspen, modifiy the existing deck, replace a window and repalce stone
with siding.
Participants:
owNER WTLUAMS, ALFRED H. & SUZAN 0812212006
PO BOX 18420
AVON
co 81620
ARCHITECT VTCTOR MARK DONALDSON ARCHIT0s/2212006
OO48 BEAVER CREEK BLVD, sIE2O7
.PO BOX 5300
AVON
co 81620
License: C000002070
APPUCANT VICTORMARK DONALDSON ARCHffi0B/22I2006 Phone: 949-5200
PrcjectAddress: 1401 LIONS RIDGE LP VAIL
1401 LIONSRIDGE LOOP
Location:
ProjectName: WILUAMS RES. CHANGE
Project Description:
Legal Description:
Parcel l{umber:
Comments:
Motion By:
Second By:
Vote:
Conditions:
DRB Number: DRB060384
Phone: 970-949-5200
loh 4 Blod(:KsuMivision: UON'S RIDGE FIL.2
I
2103-122-0200-6
See Conditions
BOARD/STAFF ACTION
Action: STAFFAPR
Date of Approval: 09/05/2006
@nd:8
(P|-AN): No changes to these plans may be made without the written @nsent of Town of
Vail staff and/or the appropriate review committee(s).
Cond: 0
(Pl,AN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
@nd:201
DRB approval shall not become valid for 20 days folloMng the date of approval.
Cond: 202
Approval of this project shall lapse and become void one (1) year following the date
of flnal approval, unless a building permit is issued and construction is commenced
t
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2128 fax't 970.479.2452
web: www,vailgov.com
parcef No.! 2l ozl?;2.ol- oot (contact Eagle co. Assessor at 970-3zg-g6,f0 for parcel no.)
Zoning:
Name(s) of Owner(s):
Owner(s) Signatur€(s):
Name of Applicant:
E-mail Address:rax: 9r{Q - 52os
Type of Review and Fee:
F. Changes to Approved Plans
Submittal Requirements:
$20 For revisions to plans already approved by Planning Staff or the
Design Review Board.
?"nn". To The ApproveJi,"n,
Application for Design Review
General Information:
All poects requiring design review must receive approval prior to submiting a bullding permit applicauon. please
refer to the submittal requirements for the particular approval that is requested. An application idr Design Rwiew
cannot be accepted until all required information is recelved by the Community Development Deparfnint, Theproject may also need to be re\riewed by the Town Council and/or the Planning and Environmental Commission.
D€sign review approval lapses unless a building permlt ls issued and construcfion commences within
one year of the approval.
Description of the Requese Rcuirion to ofrc-y- , p.rannw6 -It-gZ. A.SSIa:1.tElPU;.onzf r^rr,.o,..t,''' T" l.lon-n.rf:T. Re#n-ra,@ -Tfy
\( L-./l{Z'ler r/'l.ttt4- D,\^{A{LF EALILT EFrrf.lOM I ..rr,sor:]. (
Locationof theProposal: tot 4 ebck:-suooivision: Liarrsridsc, Loap Fil. No , q
Physical Addrcss: \
uailingnaaress: PO Box 53oo , Avon, Ct>;:
v
0
d'c
W
@
Mailing Address:
For Office Use Onlv: V <1 t
Fee Paid: Z S -= CheckNo.: LV' By:
sG. oaTb
Flcde\,AFORMS\Permits\Planning\DRB\drb-change_to_appro\€dJrlsns_1Jage_05-1 1-2006.doc
$TT
3l
E
H
5!E
$i
iig
EE
iii*E
lliE
rFi
Etr
rililGVIL
- EATETEfI, gIDIFAfMYf,
T _AL{_&,
r tPrnp we
o
fo)*7
$lF
it+:l>ils
l{
lrn
IFt<
IIlolz.
"riltif oF\tilL
OESKN REI/IHT .
STAFF AI'PFPVAL \.
ss, 6-i,4& ',
nn w?
'il'iili,$
++"* e.lr E
IrutrNsl t
DEIilGN R]EVIEUI, S'AFFAFFHWAL
FSFJ
a$
e=4+
Hg
Et-
Rmz-l
RF
Tgq*
Pr6u
FH;g
gm
tn rnrnx
70 Ul
--.r --lo6
f,nI
mx
(n-{
=o
oo
6--t
o
6
EA
=Cl
H* Hg
$BFe
HfrfiF^H€*
o
4
€
{
dI
El
I
$gfiA
Ss
mFm ul'b 1-
r*P
*a
d-
*n 8-)t{-oL "u,,
t \t^ |
A
August 21,2006
Town of Vail Community Development
75 South Frontage Road
Vail, Colorado 81657
Re: 1401 Lionsridge LooP
Changes to Approved Plans Deck Revision
Atbr: Warren CamPbell
OOqS E BEAVER Cneex BLvo
SUITE 207
Box 5500
AvoN, C0 81.620
970.949.5200
vmdo@vmdo.com
Fax.949.5205
The attached drawings are for a rcvision to previously approved plans to l40l Lionsridge
Loop.
The proposed changes are as fbllows:
1. Remove remaining aspen tree at deck af,ea to the East of the home. Upon removal
of the two tr"", udlu".nt to this ffee, it was determined that the root systems of all
three trees where commingled. The owner will plant another tree outside of the
deck area when this tree is removed.
2. Remove existing transom window on the Northwest elevation and replace with a
larger 7'-1" x 5'-0" picture window. The window will match the windows on the
home.
3. Remove stone below the windows as shown on the Southeast and Southwest
elevations. The wall has deteriorated along this area. We are proposing to
replace the wall and replace the existing stone with vertical siding to match the
building.
Please contact Al Williams (Owner) 471-1200 for site visit or further questions'
Chris J
CC: Al Williams
Attachments: Application, Elevations, Deck Plan
Sincerely,
VMDA 970-949-5200
TOWNOFVAIL. COLORADO
Staternent Number:
Palment Method:
WII.I,AMS
R060001273 Amount:
Cheek
Statement
$20.00 08/22/200608:10 AM
Init : rTS
Notat.ion: 4577 /ALFF.ED
Permit No:
Parcel No:
Site Addrees:
Location:
This Payment:
ACCOI.JNT ITEM LIST:
Account Code
DR 0 01000 03 LL2200
DRBo603I4
2L03-t22-0200-6
14 O 1 LIONS RIDGE I,P VAII.,
1401 LIONSRIDCE IloOP
$20.00
DeBcript ion
Tltle: DRB-Chg to Appr Plans
Total Fees:
Total A].IIJ Pmts :
Balance:
$20.00
$20.00
90.00
DESIGN REVIEW FEES
Currenu Pmts
20.00
Design Review Board
ACTIOI{ FOR},I
Department of Comrnunis Development
75 South FrontaEe Road, Vail, Colorado 81657
tel: 970.479.21.39 fax:9V0.479.2457
web: www.vailgov.com
Project Name: WILLIAMS RES. LANDSCAPING
Project Descripdon:
FINAL APPROVAL FORTHE REMOVAL OF 2 ASPEN TREES, REPLACE WTTH 2 CONIFERTREES
Participants:
OWNER wrLuAMt ALFRED H. & SUZAN 0613012006
PO BOX 18420
AVON
co 81620
APPUCANT VICTOR MARK DONALDSON ARCHIT06/30/2005 Phone: 949-5200
Project Address: 1,101 UONS RIDGE LP VAIL Location: 1401 UONSRIDGE LOOP
Legal Description: Lot: 4 Block 3 SuMivision: LION'S RIDGE FIL. 2
Parcel Number= 2lO3-122-0200-6
Comments: SeeConditions
DRB Number: DRB060268
Motlon By:
Second By:
Vote:
Condltlons:
BOARD/STAFF ACTION
Action: STAFFAPR
Date of Approvalt O7 I 1912006
Gond: 8
(P|-AN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
@nd:0
(PLAN): DRB approval does not consUtute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval.
Cond: 202
Approval of this project shall lapse and become void one (1) year following the date
of final approval, unless a building permit is issued and construction is commenced
and is diligently pursued toward completion.
Cond: CONOffi82,lB
The applicant shall install temporary irrigation to the new evergreen trees to
insure their survival on a south facing slope. Once the trees have established
themselves, minimum of one-year, the temporary irrigation may be removed. The new
trees shall be planted prior to requesting Planning Inspections for the o<terior
remodel on the house.
Planner: warren o"t',ons retaio: $2o.oo
*m Departrnent of Community Development
75 South Frontage Road, Vail, Colorado 81657
teli 9-10.47 9.2128 fax: 970,479,2452
web: www.vailgov.com
General Information:
All projects requiring design review must receive appro\ral prior to submifring a building permit application. Please
refer to the submittal requirements for the partjcrrlar approval that is requested. An application for Design Review
cannot be accepted until all required information is received by the C-ommunity Development Department. The
project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission.
Design rcview approval lapses unless a building p€rmit is issued and construction commences within
one year of th€ approval,
Minor Exterior Alterations
Application for Design Review
Location of th€ Proposal: t-ot: rl aock:-
Physical Address:
Parcel No.i
zoning:!S
Name(s) of Owner(s):
I
Mailing Address: I
Owner(s) Signature(s):
Name of Applicant:
Type of Review and Fee:
tr Signs
tr Conceptual Review
E New ConstructionI Addition
n Minor Alteration
(multFfamily/mmmercial)
M Minor Alteration/ " (single-family/duplex)
tr Changes to Approved Plans
tr Separation Request
(Contact Eagle Co. Assessor at 970-328-8640 for parcel no.)
. L-\lr 5
No,
d
vt
v{oc
or,re$50 Plus $1.00 per square foot of tobl sign area.
No Fee
$650 For construction ofa new buildirE or demo/rebuild.
$300 For an addition where square footage is added to any residential or
commercial building (includes 250 additions & interior conversions).
$250 For minor changes to buildings and site improvements. such as.
re-roofing, painting, window additions, landscaping, fences and
retaining wallg etc.
$20 For minor changes to buildings and site improvemenb, such as,
re roofing, painting, window additions, landscaping, fences and
retaining walls, etc.
$20 For revisions to plans already approved by Planning Staff or the
Design Review Board,
No Fee
Mailing Address:
L'Jrff"Zt gtt.
cn",r. no., LILV ev,
MeerinoDare: 7- Z -6b DR
Planner: = Project No.
*******'it***t**+**************r3*********************+**+++*tt**+t*+********r*******+*+*+*+**
TOWNOFVAIL, COLORADO
Statement Number: R050000906 Amount: $20.00 06/30/200609:23 AM
Payment Method:Check Init ! ils
2 42 4 / CHRISTOPHER JUERGENS
Stat€ment
lilotation:
$20.00
******* 9f $**++******'** * *+* ***********+**** *:1. !t*{r*****{r* * * * + * * * * * **+**** * * *'}*+******* * * * * * * *:} *
Permit No: DR8060258 Type: DRB-Minor Alt,SFR/DUP
Parcel No: 2LO3-L22-O2OO-6
Site Address ! 1401 LIONS RIDGE LP VAIL
Locatsion: 1401 LIONSRIDGE IJOOP
Total Fees:
Tot,al ALL Pmts :
Balance:
This Palment:
ACCOIJNT ITEM LIST:
Account Code
DR 001000031L2200
Description
DESIGN REVTEW FEES
$20.00
$20.00
90.00
Curren! Pmts
20.00
c
June 29,2006
Town of Vail Community Development
75 South Frontage Road
Vail. Colorado 81657
Re: 1401 Lionsridge Loop
Minor Exterior Alteration
Attn: Warren Camobell
004 8 E B EAVE R CREEK BLVD
SUIIE 207
Box 5100
AvoN, C0 81620
970.949.5200
vmdo@vmdo.com
Frx.949.5205
The attached drawings and photographs are for a minor exterior alteration to l40l
Lionsridge Loop.
It is the intention of the owner to remove two existing aspen trees from the property.
These trces shall be replaced by two new conif.erous trees (6'-0" high).
The reasons which necessitate the removal of these trees are as follows:
l. Tree is falling toward the residence. The base of its trunk is bound to the base of
another tree in order to keep it upright. Even with the strap in place, the tree still
hangs over the roofofthe residence.
2. Tree is diseased md rotting.
3. Trees are too close to the building and are oppressive to the exiting flom the
living room.
When the trees were planted they were likely six feet tall and fit nicely near the deck.
Now that the trees are mature, they are interfering with the structure around the deck and
building.
Please contact Al Williams (Owner) 47l-1200 for site visit or further questions.
Sincerely,
VMDA 970-949-5200
CC: Al Williams
Attachments: Application, Photos, Site PIan.
PROPOSED I.ANDSCAPING
Botanical Name Common Name Ouantitv Size
PROPOSED TREES
AND SHRUBS
EXIfiNG TREES
TO BE REMOVED
Cort,{<c ----a-
.lv
A*p*'' & -N-
Minimum Requirements for Landscaping: Deciduous Trees - 2" Caliper
Coniferous Trees - 6' in height
Shrubs - 5 Gal.
Type Souare Footao€
GROUND COVER
SOD
SEED
IRRIGATION
TYPE OF EROSION CONTROL
Please specifu other landscape features (i.e. retaining walls, fences, swimming pools, etc.)
F:\cdev\FoRMs\Permits\Planning\DRB\drb minor-alt 11-23-2005.doc Page 7 of 13 LLl23/2005
'l hIrl
3#
=-5p_ + _lrcr'l#l
I
-."-
- I'
//
I3.v.
*.r.
-,
rtt
ra
4.,'I
ii;'
*
I
t
I I
!6EA
O -|,.r-l|-O i-rr,.*BolD -|,iron .Er.
lr-tu
&rs
-.lrsranFrff.-.trtt
!rrff5.Fl
OO48 E EEAlIER ffiEtr BI.VD
$ulTE 207
B0x 5300
AV0N, C0.8r020
970.949,5200
vlnda@l,|Ild a.co|n
FAX 949.5205
v,E
--lBJh9>Futo9 -t9B<BAEr^da=1
E<3z
q,
v,:l
-'t--_
---*t;#:lS
::, $f -=---- :--,.= .:= -: 1-],-\ i +>,
-.,,'.-. --+ __-,._ - --.--------' ' --:-*:::--,-:__-___:r=/ *qo
g,.- _,- __ _:11, -_--F=. :._'- -- - _ _:l:-_====_r*= *- -_ _ -___ :_ - - . _\_ - _ =-_
- ;:=J_- -L_. - ._1, . ___,_,--.--;-,'--.--::,'- - : - ---: --," 1 .t.--,'.) --
;J-
t.rf.-....-.-
-..-.---=l -,-,-,1-:t. *= -:,=-j 1-,-t--- -;, '"'-.. !';
-'13--t
N | -' - - -.{ t--:: --,1. '
J1---' -:.-7-.,iliirg-- - \=l;f;l$itl q' t'10;.1';..:.,1.1-.-.._-. , , ,,,,t'::,-,''!'-l,;;,,,;;'.,1::..,.:::r.-'"-'-.'t
1--------7--'T--f --- ----'-:-:-:+*---*--:r--------*-------i--'--"----------7
& ",grg,*,r TOWN OF VAIL
DESIGN REVIEW." S?:AFF APPROVAI.
, .-l-
----*'.ij
I '.---
- .:--_l:,.-. , . I --- '-= --=':+ 1t:.
--- :-''
1-6-oe
C0*'[trffrT 0E!E!#ng{T
? /'-'/mLq L
Ilesign Revieru Board
ACTIOITI FORtrl
Departrnent of Community Oevelopment
75 South Frontage Road, \Iail, Colorado 81657
teh 970.479.2139 fax: 97tl.t{79.2.f52
web: rvww.vaitusv,€om
Proiect Name: wILLIAMS CHANGE
Project llescription:
DRBNumber: DR8060370
FINAL APPROVAL FOR A CHANGE TO THE APPROVED PI.ANS TO CHANGE THE DECK
Participants:
owNER WILUAMS, ALFRED H. & SUZAN 08/14/2006
PO BOX 18420
AVON
co 81620
APPUCANT VICTORMARK DONALDSON ARCHITE0S/14|2006 Phone: 949-5200
ProjedAddress: 1401 LIONS RIDGE LpVAIL
1.101 UONSRIDGE LOOP
Location:
Legal Description: Lot 4 Block: 3 $rbdivision: LION'S RIDGE FIL. 2
Parcel Number: 2103-122-0200-5
Comments: SeeConditions
Motion By:
Second By:
Vote:
Conditions:
BOARD/STAFF ACTION
Action: STAFFAPR
Date of Approval: 09/0612006
Cond: 8
(P|AN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction adivnies.
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval.
Cond:202
Approval of this project shall lapse and become void one (1) year following the date
of final approval, unless a building permit is issued and construction is commenced
and is diligently pursued toward completion.
Cond: CON0008365
The applicant shall match all materials on the new deck to those exisitng on the
deck to be removed,
Planner: WarrenCampbell DRB Fee Paid: $2O.OO
;
t Changes To The Approved Plansffi\ Application for Design Reviewfi\ r\dt*\ 1-/4.I Department of Community Development
,r*r,orffi. i{' 75 South Frontage Road, Vail, Colorado 81657
.lUnYUf ynltr,/ tel: 970.479.2128 faxi970.479.2452
web: www.vailgw.com
General Informataon:
All projects requiring design review must receive approval prior to submitting a building permit application. Please
refer to the submittal requirements for the particular approval that is requested. An application for Design Review
cannot be accepted until all required information is received by the Community Development Department. The
project may also need to be reviewed by the Town C.ouncil and/or the Planning and Environmental Commission.
Design r€vi€w approval lapses unless a building permit is issued and construction commences within
one year of the approval.
Description of the Requestl
Name(s) of Owner(s)l
Mailing Address:
Owner(s) Sagnature(s)i
Name of Applicant:
For revisions to plans already approved by planning Staff or the
Design Review Board.
Locationof theProposatt tot:? etock:-suUaivision:AiOr,r5ert"r.€' klc\r€[.
physicarAddressr {LtOl Liors.se-rv a L,oOP
Zoning:
p
N
6)'P\
6\
o
tAlv
o
$20
(Contact Eagle Co. Assessor at 970-328-8640 for parcel no,)
F;'.'rff
* tZ8nlb cnecr r'ro., { s./6
F:\cdelAFORMS\Permits\Planning\DRB\drb_change_to_approved_!lans-1_page_05-11-2006-doc
R
August 10, 2006
Town of Vail Community Development
75 South Frontage Road
Vail, Colorado 81657
Re: 1401 Lionsridge Loop
Changes to Approved Plans Deck Revision
A1ln: Warren Campbell
0048 E BEAVER CREEK BLvD
SUiJE 207
Box 5500
Av0N, C0 81620
970.949.5200
vmdo@vmdo.com
FAX.949.5205
The attached drawings and photographs are for a revision to previously approved plans to
1401 Lionsridge Loop.
The attached plan is a new deck reconfiguration for the East Deck on the existing. It
came to the attention of the owner that the existins deck is structurally not sound and wilt
need to be replaced.
The guardrail will match the existing guardrail walls on the home, see attached photos.
Please contact Al Williams (Owner) 471-1200 for site visit or further questions.
Sincerely, \
0l.M
Chris Juergens
VMDA 970-949-5200
CC: Al Williams
Attachments: Application, Photo Deck Plan.
R$
i8
$E
$H
E
il$+
?
E
E
H
6F-
E
l
f,* E-
EHIH
F$F$
I
$F
$H
NE
I
fi
fi
u
Etu
$
H3
v.
F
d
HpiE
=Bls*
sg
TPWN OF VAIT
DESIGN REVIEW
STAFF APPROVAI. ..
)L- 06
-o
I
ll
ctlt'
:
niJ
V
\)tuD
F
{
JJ
{
J
{
\)
0-
F
lu
T
H
le
$lla VAIL
DESIGN REVIFW
STA Ff- .4' r''l :1.)\ /Al-
T-tr"- oa
LdcLr
- }JfHlfltt RIIfD$tct
Itftl- - wtfilfl &filfil{lil
r{0r tm$mcf l00P, t,ilL ruoru)(}, s1657
Birc|:r}€.9pe tlfttl--$GJ3et" *.ft' tE Fda*{
ARCHI
'****+*d.******++***********'S***************:t *'l**1.*********************,i**************r.i.****{.{.
TOWNOFVAIL, COLORADO Sbtement********'f*********+'******!F********++*+++*****+***+++**+******'$************************+**+**
Statement, Nutdber: R060001215 Amormt: 920.00 Oe/L4/200603:43 pM
Paltment Method: Check Init : .fS
Notation: 4576lAL,FRED
WTLI,TAMS
Permit No: DR8060370 fype: DRB-Chg tso Appr plans
Parcel No: 2tO3-122-0200-6' Sitse Address: 1401 LIONS RIDGE Lp VAIL
Lrocation: 1401 LIONSRIDGE LOOP
Total Fees: $20.00This Palzment,: $20.00 Total ALL Pmts: g2O.OO
BaLance: $0.00*************+***,t {.*******+**********************++++****'}**********+********************.r**
ACCOUNT ITEM LIST:
Aecor:nt Code DescriDtion Current pmts
DR OO].OOOO3T122OO DESIGN REVTEW FEES 20,00
tr*n*X{TT lxtrunF[Efit
1L*t
Design Review Eoard
ACTIOT{ FORITf
Department of Comrnunity Development
75 9outh Frontage Road, Vail, Colorado 81557
tel: 970.4/9.tt39 tax:9f0,479.2,{52
rveb: www.vaitgov.com
Prcject Name:
Project Description:
Participants:
Project Addressl
Legal Description:
Parcel Number:
Comments:
WILUAMS RES. BffERIOR REMODEL DRB Number: DR8050153
FINAL APPROVAL TO REPIACE ROOF W|IH A 50 yR SHINGLE, SIDING, WINDOWS, ADD 4
WINDOWS/DOORS
owNER HART, RICHARD H. &IANE y. 05/15/2006
1401 UONS RIDGE LOOP
VAIL
co 81657
APPLICANT VICTOR MARK DONALDSON ARCHIT05/ t5 12006 Phone: 9z19-5200
PO BOX 5300
AVON
co 81620
1401UONS RIDGE LPVAIL Location: 140l UONSRIDGE LOOP
Lot: 4 Block: 3 Subdivision: LION'S RIDGE FIL. 2
2103-122-0200-6
SEE CONDMONS
Motign By:
Second By:
Vote:
Conditions;
BOARD/STAFF ACTION
Action: STAFFAPR
Date of Approvalz o6lo7120o6
Cond:8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate review committee(s),
Cond:0
(P|-AN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval.
Cond:202
Approval of this project shall lapse and become void one (1) year following the date
of final approval, unless a building permit is issued and construction is commenced
and is diligently pursued tor,vard completion.
Cond: CON0008098
THE APPUCANT SHALL INSTALL THE NEW HARDIE PLANK SIDING IN A MANNER IN WHICH NO CUT
ENDS ARE EXPOSED. CUTS ENDS SHOULD BE HIDDEN FROM VIEW BY OTHER PLANKS, TRIM, ETC.
cona: coNo?eogs
EVERY EFFORT SHALL BE MADE TO PROTECT THE EXISITNG VEGFTATION ON SNE. ANY DISIURBE
AREAS WILL BE REQUIRED TO BE RETURNED TO THE STATE THEY WERE IN PRIOR TO
CONSTRUCflON. nO TREE REMOVALS ARE APPROVED AS A PART OF THIS APPUCATION.
Warren Campbell DRB Fee Paid: $20,00
I Minor Exterior Alteratlts
Application for Design Re
Department of Community Darelopment
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2128 fax: 970,479.2452
web: www.vailgw.com
General Information:
All projects requiring design review rnust receive approval prior to submining a building permit application. Please
refur to the submittal requiremenE for the particular approval that is reque$ed. An applicaton for Design Rwiew
cannot be accepted until all required informaUon is received by the Community Development Depaftment. The
poject may also need to be reviewed by the Town Council and/or the Planning and Environmenbl Crmmission.
Design review approval lapses unless a building pennit is issued and construction comnrences within
one year of the appmval
Location of the Proposa lz totz 4 ebck:- Subdivision:
Physical Address:
Parcel No.:3/J
Zoning:
Name(s) of Owner(s):
Owner(s) Signature(s):
Name of Applicant:
Mailing Address:
0
6\
o
o\
l'dType of Review and Fee:
tr Signs
tr Conceptual Review
O New ConstructionD Addition
tr Minor Alteration
( multi-family/commerdal)
>g Minor Ateration
./ \single-family/duplex)
tr Changes to Approved Plans
n Separation Request
$50 Plus $1.00 per squarc foot of total sign area.
No Fee
$650 For construction ofa new building or demo/rebuild.
$300 For an addition where square footage is added to any residential or
commercial building (includes 250 additions & interior conversions).
$250 For minor changes to buildings and site improvements, such as,
re-roofing, paintng, window additions, landscaping, fences and
retaining walls, etc
$20 For minor changes to buildings and site improvements, such as,
re-roofing, painting, window additions, landscaping, fences and
retaining walls, etc.
$20 For revisions to plans already approved by Planning Staff or the
Design Review Board.
No Fee
(Contact Eagle Co. Assessor at 970-328-8640 for parcel no.)
Mailing Address:
Phone:
.!j. r.- tr
,,'
j'li
af,'
tiI
tf.frt
;J
. '; .r'ilr ). ,j
.,1,-.-4 r,
"
.j-' -,-]t
l i';;t
V}4DA
ilffinrqtY DEED
ETRT
PA6E B2Ig3
.-.-.:YLu!'ryL6--l-E: 4e sresasszf
THIS DEED, uade on thls doy sf MaY
*titi*i-". HARI ArdD JAlrl YoR*
, bet$ccn
,rrd state of COLOR'IPO ' ol thr Grantor(s)' ard
e
rthogeof theof
WlTltESS, Ihat the Grantot(s)' t"t-"* tt,".TiT::::T":i the sun of (S1,?98'500'00
DOLLARS
.- -HH,h :I:H"ffi ;ili*n' t*".'* **" i:5-i:' :il:;*"J'il:-*ll##"i:i,'r.ti' j##*il*l,liffi
$'n ji*;#,qf iffi*'il;
;ji.ltril#;ff i#rn?:#1*t:;'"u;qiffi EU-"":l+:i,{il:#,'i#**d;#r'r+*i'ii.l.i' 'ao*.r!**:t ii:,rpffi l^..;;;;i1"1;'41i"#ffi s"i'l"JlHiliifft "*:iuuo sE?rEuBEn*'[$,ffi f#i#.ffirrrgs',"9'$"3Fut#'H':iiLC*Y'$1$1amil;ll*-"tlr
aE
" r'|rD'^'r rrD FotEvER osrrlb the above barsained-fl::t::t":1":* fri?ltif"i:fii*'i
rhe crantor(s) ehatl and-rilt *lltlg.l-:jt:::il.lltl!"r*, arr.end €verv Sljl?;;-'.rn*rrr, and ths u3e or €
.lgoknormasstfGetr*rnberl40lLIoNgRIDGEwoelt.IoNsRII,GEFlL2I.roT:{vA'I,co81657
ffi'
of the countY of
A'.FRED H. lfILtrIt'MS ANn sozlll N. lfllr&lrMg
lcgal address ts :
ElE
!i'"ii' #- lre!iqt!:. l:. :It T*"ll :hTttmilff U*"dih Iil-i;;''t or( s t ha. sx€cuted'
SIAIE 0f COIIO8.RDO )ss.
ColntY of AICI"E )
fr.,,,,*",,'*,';l.i$"iii:.Hl#if:iiihillilr,:i,il,:{#til}.'*l''ii}s"#i'i"'q#*:'u:'Y
ll; i:'l:
il:":::?H"l;'.i$l.i$"!iil$il#i5"*"li:ilFii:;h*i,:"#i[I ffr;i il"0:fiilir;'#'ir; ui" 'i a6v scrdar
Il-.-. -"nt thereof. fh: 3!l. I r ---r-,6 -a, -/ ,^- r-r- ..+ {^dth ehva.
F i ted f ot record thc-,-J
ffi otctock-J
day of 'A'D' I o\-'--" BY
ieccption llo'
iffiE-YoEmARr
lhe foresolng lns-truEnt.uEs Tlf,Jt'J3**o';fifrT tttt 't "
ffiliHtE'#Hbmn:1se
lly co rl
Ui tl|cs3 .Sftft q- #**kF1' '
ii:# s8ll::li
Uhen Fecordcd Return to:
E66T-SEEEiiPIion t
n*ro *. tlllttAlls Allg suzAll ll' ullllAlls
rorrn e5 084!491-49!3I (Joint Tenants
PO Box 18420, ^vol,
co 81620 (t269690)
-:;!E!.'-.*-E
-19:4e s7ae4e52al'VMDA FAGE AYBS
(hrr Orrlcr No' V50012694'6
EXIII''I,T 4
tfi qp$fl6tr+"Uif'l;;}ilfitilf}Stfi #$'fi3#H:fl
;
l,.s,ll;Jl,il+tTlJ,tr#,Tf a,".ill+l8:?xilrHi;ER,Pl#l'-iH;1"-ilsf il""
;il,;N uoor ls Ar PAGE 542'
REsrRrcrrvEqgv:llfiiytfgJ-?ilii?'l."liil$r,ff pffijliTf i{F^iy'-
fi SH'fiSHl.i#ff1ilff;ulsex'-lglya3l,ornroRrGrN,ANcEsrRY,oR
AMENDED IN DOCUMI
EASEMENT AND RIGHT OF wAY As olfllF'D'Tro HoLY CROSS El',ECTRlc
AssoclArtoN' '*t" tni"]i*tiiiinul"er'.,r nuc6nieu AuGUst 24' te67 lN
BOOK2II AT PAGE IO3-
'w'-xl-*pi'*#rrdi-uli,e*-$lt#**lF*T*
NO' 2, RECORDED SEPTI'MEEK z'r r7r"
EASEMENrS,cllP:li"Jii""3,"F$fJ'ffi it1,'l$l$l'3T'tTi3txt;tssANDNorEs
ON TIIE PLAT OF LI(
'E'TEMBER
20, ts'ziiiriil'fi nBcnpmoN No' rztzre'
(ITEM INTENTIONALLY DELETED}
PROPOSED MATERIAIS
Tvoe of Material ColorBuildino Materials
Roof
Siding
Other Wall Materials
Fascia
Soffits
Windows
WindowTrim
Doors
Door Trim
Hand or Deck Rails
Flues
Flashing
Chimneys
Trash Enclosures
Greenhouses
Retaining Walls
Exterior Lighting
Other
Nft
F/tpTctt 6{tral c"-
To Pannx)
,tt+rurcu.t 5t prn/c.. (n LDe_
Notes:
Please speciff the manufacturer's name, the color name and number and attach a color chip.
F: \cdev\FORMS\PERMrrS\Planning\drb_mlnor_alt_l1-23-2005 ;doc
LLl23l200S
TI eawuqtxt
lr\/*
Page 6 of 13
o
a
a
a
a
Location of all required parking spaces
Snow storage areas.
Proposed dumpster location and detail of dumpster enclosure.
Retaining walls with proposed elevations at top and bottom of walls. A detailed cross-section and
elevation drawings shall be provided on the plan or separate sheet. Stamped engineering
drawings are required for walls between 4' and 6' feet in height.
Delineate areas to be phased and appropriate timing, if applicable
. Location of existing trees, 4"or larger,, Indicate trees to remain, to be relocated
(including new location), and to pe removed. Large sbnds of trees may be shorrrn (as bubble) if
the strand is not being the proposed improvements and grading.. Indicate all existing ground. Detailed legend, listing the and size (caliper for deciduous trees, height for conifers, gallon
and shrubs.
size for shrubs and height flr foundation shrubs) of all the existing and proposed plant material
including ground cover.. Delineate critical root for existing trees in close proximity to site grading and construction.. Indicate the location of 4i proposed plantings.. The location and type f existing and proposed witering systems to be employed in caring for
plant material its installation.. Existing and contour lines. Retaining walls shall be inbluded with
the bottom of wall
Indicate type, location and fixtures.
Include height above grade,output, luminous area
Attach a cut
For all proposals to repaint existing buildings, the following supplemental information is required:
Cnlor chip or color sample including the manufacturer name and color numbe(s)
Architectural elevation drawings which clearly indicate the location of proposed colors (ie. siding,
stucco, window trim, doors, fascia, soffiits,'etc,)
F:\cdev\FORMS\PERMITS\Planning\drb_minor_alLl 1-23-2005.doc
11/?3/2005
the top of wall and
ra
a
a
Page 5 of 13
A
May 15,2006
Town of Vail Community Development
75 South Frontage Road
Vail, Colorado 81657
Re: l40l Lionsridge Loop
Minor Exterior Alteration
0048 E BEAVER CReer Brvo
SurrE 207
Box 5300
AvoN, C0 81620
970.949.5200
vmdo@vmdo.com
FAx.949.5205
The attached drawings and photographs are for a minor exterior alteration to 1401
Lionsridge Loop.
It is the intention of the owner to upgrade the exterior envelope of the home into a
maintenance free system.
These minor alterations include the following:
1. Replace all existing wood windows and glass panes with aluminum clad wood
windows. Color to match siding. ln addition, the windows are being altered in
four locations illustrated on the drawings and photos. The owner's intent is to
keep the comer window appearance on the home, while allowing a vertical comer
mullion so the windows will perform as designed.
2. Replace all the vertical siding with a hardie board vertical siding. Along with the
siding replacement, the owner is considering upgrading the R value of the exterior
walls from an R-l1 to and R-19 or greater. This may be done from the inside, or
with a rigid insulation applied under the new siding. Color sample attached, this
color will match existing color of the home. Color will be a low sheen or flat
color.
3. Replace existing asphalt roof with new asphalt roof. Elk Prestique raised profile;
color Barkwood, color copy sample attached. (80 mph rated).
Sincerelv-
Chris J
VMDA 970-949-5200
CC: Al Williams
Attachments: Application, Photos, Plans, Elevations, Color Sample, Roof sample copy.
x***********+'t****************++++*******t**********************+++*+**+++******************
TOWNOFVAIL, COLORADO StaK(nCNT******{r*****'}**+**********+****+***+***++**************************** *** * * * * + + + * * * + + * + + * * * **
Statement Nr.uriber: R050000599 Amount: 92O.OO OS/15/200604:28 pM
Payment Method: Check fniE.: JS
Notation: 417 0 /VICTOR
IVIARK DONALDSON ARCHITEETS
Permit No: DRB0E0163 qrpe: DRB-Minor A1t,SFR/DUPParcel No: 2!O3-f22-02O0-6
Site Address: t4O1 LIONS RIDGE Irp VAIL,IJocation: L4 01 LfONSRIDGE IJOOP
Total Fees: S20. OOThis Payment: $20.00 Total A]JIJ pmts: 920.00Balance: S0.00**++***+********************i.d.d.*****+*******************,F*'F,$*'!****:i,r**'t r.**.t***********,t+*+**
ACCOUNT ITEM LIST:
Account Code Descript,ion eurrent Pmts
DR 00100003LL2200 DEsIcl{ REVIEW FEES 20.00
oFl{>o=oSJt5SJ.--o-, '6 q,)
? el3B€'Ee
=HH86 ,rl - E
HFHs
=
Rg
Lt-l>
LIJ
CD
LrJ
ssE
8EE
-C.)
o€J
-l
a-oo
-Jru
€Da
Eg,
-o
J
ocf
Ltl
CJ
=,llt6
-v,lllg
v,
=
-l-l
=J
6
=,
=,q,
-lv,
QET<'a=a<\ >< c\t..-o, '6i o)
=6=- <5 att!-- 'E LL
e
9RFF:r.o-
xHnE5 q<
e. o-=
IJJ <,
LLIdt
LIJ
ssEltt<'-o8E
-e>
rlle)
=rllA
-v,rrtv,v,
=
-JS
=E-o
-l -r-.<=
A*
=.4{,5
=,3<.3vt=3=c) !,
N
\
\
'"s i
\:
.Jg
o
tr,
0-
o-
'J.ll.d
'q,
$t$I
fiiifi
fl qi*;
o = rrato=o$J -5 S{.-_or -- o,
+ 6ey (g cat!_-'E t_-L
=
eSaR
-r c{ c.) <o6 ,r, - E
HFHsO P6ELrl <>
LIJ6
IJJ
tL \o rl'iii Set6{-o8E
ea
rllCJ
=,rrtAq
tl|g,
v,
=
3s
=E-8el -l-<=
6{
=={,9
=3<,2c/,
=3=qr=
l
s
?s
\\)
LL:o'
7lol
Fl{l>l
5lurl
FI
SliKhIl+Ft-vt.
otHzlB
/'--\t9EEE
o
F
oFr.()a=o<\l x c\t.._qr -6 0->q6rT
8Ese
qRES
6 .r, - 5
HFHeA e=t o-=
lrleLll
CD
Lt-l
\O tt-
-Q g-
,.r- Q
<rf
Oi!
4t
i-
f
r&te)
=,rllAv,rlfg
v,
=
-l r-J3
--E,-
-o
-l -r'<,=E
a{
=,E{,5
=,?<,2vt=E)=vr!
0539
r40r il0NtRrD6r r00l vail., c0r0RAD0, 8165i
AR: Ii I - ECTS
t rl .r!
,l 1 ,{B.a
b--
Vlt\{ 2- NORI|IIAJI tttVAIlON Nt\,/ ttlDtR D00R L0CAIIOl.| #3
\{ILLIAfis?I5IDINII
,40r U0tlJRtD6t t00P valL. i0L0R/1D0. Bl65/
\/tf\,v 3 t0|]llit{t5l tLtvlil0N .l'li\{ wlNDOvJ rN tTUDy i/2
0539
ON lll|ItIAfi'?r5D[NCT 0s39
r40l u0t{tRrD6t r.00p, vatt. cot0M00. 8165/
vrr'll 4-50uil{'l|tJt fl.tvalr0il-1{E|, al{l{tt{G VtilDotl at BRta|(fafl aRIA #l
o3I \{ILLIAfIS RT'IDTNCI 0539
i"''.. i!' 1.' ,
GEm rlfrul illl/ i'
VII}/ 5 NORTNIASt ILTVAIIO|l CORl.lIR l/Il\|DOW AT DIt'lING ARIA
rii,,,
illiii
llli r,'
iirliii
llllIl
r40r il0l{5RrD6t t"008 vatr. cOt"0RAD0, Bt65/
il Ri l l - F
VI[!I 6 -'OUIIIIJIJT fI.TVA]ION .IORNTR v/I}|DO!|l AT BRIAKfAJT ARTA
,. utrlua/rsftnumcr 0539
r40r rjoilnDGr r.0@, yarL t0tflrDo.8165/
vrtv 7-t0uHilfl trrvailolt .cofffiR utt{DfrtJ ar Ul|il6 R00l[ & BtDRoor
Elk Building hoducts, lnc.ofroofing, composirc building... Page I of 2decking milinS
o
lvlanufrctw€ro
Llpme
About Elk
Pre4uelg
Peied Plalning
Produst Pholos
Warranty & Rgg istration
Homeowner Support
Contacl Us
Mew Home Photos
\Nhere To Buy
View Application / Spec Sheel
' Product Limited Warranty
htp ://www.elkcorp.com/lromeonmerVproducts/shingles_raisedprofi le.cfi n
ffi RarsedPror'ile'&
fKLtIILts Sffitu=fi,ffi"ffiL1ffi9fo*j .ffitr#,g5"
dfonen*xatty lcnd rny homo a subd!, aalbrnd l6k wlh lhe wemlh of rd- Unlike
unt€abd n'ood d*El6s, Ek Rais€d Pmfu shirElos h8E ho rmr*sd ftre|€si!€nca
and du.ettlity of |rninfid 3hingl6s. Railed ffie orhr8 a 3o-year &nibd wranty with
an opdion for fnibd t mfrrabiliu,' ot up b 70 mph' and, fl(e all Elk shilgbs, is UL
Clasa "A- ft+rabd.
Colorsurbhes:
:'':|.
t1EA5E
I
-I
---Xrtocodl
h rit
Antique Slate
ForBst Green
Aspen White Barkwood Birchwood
Sandah,rroodHickory
Weatheredwood
Sablewood
Shakewood
strst2006
Page I ofl
http://www.elkcorp.corr/imagedproducts/swatches/grande/g-barkwood jpg sl15D006
t
DEPARTMENT oF coMMU*rrtu*oPMENrTOWN OF VAIL
75 S.FRONTAGEROAD
vArL, co 81657
970-479-2138
I-o{1, L-^6"^-.'if^16-A
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALT SFR BUILD PERMIT PCTMit #: 806.0159
Project # PRI064191
Iob Address: 1401 LIONS RIDGE LP VAIL Status . . . : ISSUED
Location.....: 1401 LIONSRIDGE LOOP Applied . . : Ml2ll2W6
Parcel No...: 2I0312202N6 Issued . .. : Wl2ll2$6
Expires. ..: 0lll7l2ffi7
owNER rrART, RTCHARD H. & ,JANE y. O6/2L/2OO6
1.401. I,IONS RIDGE LOOP
VAITJco 81_657
APPIrICAliflr WOODSTONE HOMES, INC. 06/2L/2O06 Phone: 970-845-9698
P.O. BOX 3939
VAII.co 8L558
License: L48-A
coNrRAcToR wooDsToNE HoMES, rNC. 06/2T/2005 Phone: 970-845-9698
P.O. BOX 3939
VAIL
co 81658
IJicense: 148-A
Description:
REPITACE ROOF WITII A 50 YR SHINGIJE, SIDII{G, WINDOWS, ADD 4
VIINDOWS/DOORS, NEW KITCITEN, NEISIJOWER LEVIEIJ BATH.
Occupancy: R-3/U
Type Construction: V-B
Valuation: $60,000.00 Revision Valuation: $0,00 Total Sq Ft Added: 0
*:l*t{.********'l,l.**r.t+{.*'|.+*+**:t***f*****:l**,i{<*)i{i*{i*****:t*******{t***)l+
Building---- > $713.75 Restuarant Plan Review--> $0.m Total Calculated Fees- > $1,180.69
Plan Check--- > $463.% Recreation Fe€---------> $O.0O Additional Fer6------ > $125.00
Investigation- > $0.0O TOTAL FEES-------------> $1,180.69 Toal Permit Fee----- > $1,305.69
will Call------> $3.0O Payments----------;' $1,305.69
BALANCE DUE----.> $O.OO
Approvals:
ItCM: O51OO BUIIJDING DEPARTMEI{IIT
07 /L9/2O06 cgunion Action: AP asbestos abatementpennit required prior to issuance of the building permit.
Item: 05400 PLANNING DEPARTI\4ENr
06/23/2006 Warren Action: AP
Item: 05500 FIRE DEPARTMENT
06/23/2006 ,JJR Action: Ap Monitored fire
alarm system recommended.
Fire sprinkler system recommended,
Item: 05500 PIIBLIC WORKS
See the Conditions section of this Document for any that may apply.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and suMivision codes, design
review approved, Intemational Building and Residential Codes and other ordinances of the Town applicable thereto.
REQIJESTS FOR INSPECTION SIIALL BE MADE TWENTY-FOUR HOURS ADVAIICE BY TELEPIIONE A.T 47L2149 OR AT OLIR OFfiCE IROM E:00
AM-4PM.
OWNER OR CONTRACTO FOR HIMSELF AND OWNER
{.***,1**+**rc*************rt**{.{.***,F***********'r*********,F*:**,F*****!{.*********.**.****{.****xr******.*********,i**
CONDITIONS OF APPROVAL
Permit #: 806-0159 as of O7-21-2ffi6 Status: ISSUED
* ** * * * ** **,1.* * * ** ** ** * * *:F ** ** * **<*****,k ** ** *** *:f {.,* ** ** ** **** ** ** ** * * * * * * * * * {. *'t( *,r ** *:* **** ** *rr * ic * t *{.********
Permit Type: ADD/ALT SFR BIILD PERMIT Applied: 06l2ll2Cfi6
Applicant: wooDsToNE HOMES, INC. Iszued: 07t2u2w6970-845-%98 To Expire: 0lll7l2W7
Job Address: 1401 LIONS RIDGE LP VAIL
Location: 1401 LIONSRIDGE LOOP
Parcel No: 2IO3I22WN6
Description:
REPLACE ROOF WITH A 50 YR SHINGLE, SIDING, WINDOWS, ADD 4
WINDOWS/DOORS, NEW KITCHEN, NEWLOWER LE\'EL BATH.
+******'k*,k*****:B********r({.*******'F*+********:****** COnditiOnS ******d<********r*{r*{r*ic***{r***{:***+**{.+******'k
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQI.JIRED TO CHECK FOR CODE
COMPLIANCE.
Cond: 16
(BLDG.): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION
R313 OF THE 2OO3 IRC.
Cond:18
(BLDG.): STAIRWAYS ARE REQUIRED TO MEET SECTION R311.5 OF
THE 2OO3 IRC OR SECTION 1OO9 OF THE 2OO3 IBC.
Cond: 19
(BLDG.): GUARDS ARE REQUIRED TO MEET SECTION R3l2 OF THE
2OO3 IRC OR SECTION 1012 OF TT{E 2OO3IBC.
****+++++********************+*++*********rt*'l.t****************+*rtr***********4.{.{.{.4.1.{.'f+*+*****
TOWNOFVAIL, COLORADO Statement
* * * * + + + + * * * * * ********'t**'B*'l'l********************:l,t**,r*****************{r**dt**'rt*****d.*+**+**+*
Statement Nudber: R060001046 tunount 3
Pa).ment Metshod: Check
Homes 1-53 2l-
$1,305.69 07 /2L/200611:04 AM
lnit: DDG
Notsatsion: Woodstsone
Permit No:
Parce1 No:
Site Address :
Location:
This Payment :
BP 0 010 0 0 0311110 0
crr 00100003123000
PF 00100003112300
wc 00r-0000311-2800
806-0159 I!ryIE: ADD/A],T SFR BUIIJD PERMIT
2ro3-r22-0200-6
]-4 O 1 I,IONS RIDGE LP VAII,
]-4O1 I,TONSRTDGE LOOP
Tot.al Fees :
$1,305.59 Total AIJL Pmts:
Balance;
BUf I.,DING PERMIT FEES
COIiITRACTOR I,ICENSES
PLAN CHECK FEES
WILL CAIJL INSPECTION FEE
$1-, 30s .69
91. 30s .69
$0.00*********{r*
'1.* ********d.i. {.*+*************{.**{.*****+************ * * * * * + + + + + +++***+***+*+****'}***
ACCOUNT ITEMLIST:
Accoune Code Description Current Pmta
743.75
125.00
463 -94
3 .00
'"*\,{
'ij i4;,+}:
= !:'': ':
NOT BE
75 S. Frontase Rd.
Vail, Coloradd 8i65z
COMPLETE \/ALUAT|oNS FOR BUTLDING PERMITru'.prc_L6il noo OTHER $
PLUMBING: $MECHANICAL: $TOTAL: $
fer farcel#Conhct Assessors 94Ege af g7eg?g.i864l orvisit
tffiffi#.*'**-- '.'rrr*ur rrr** FOR OFFICE USE ONL
: - nn r=
F-G\EilV/te
l-.
\r
il
"[
JUN 16 2006
1of16
TOWN QF-)/A:ll
0z(x}n005
o
TeamQuestions? Call the Building at479-2375
Depaftment of Community Development
Project Name:
Project Address:
r' This checklist must be amoleted before a Building permit aaalication is
All pages of appllcation is complete
,'{ autDRB approval obtained (if required) provide a copy of approvat form C J € E T{. | )
^l
p Plan Check Fee required at submittal for projects valued over g100,000.00 (see attached fee' schedule)
F Complete site plan submittedf'
N{Ao Public Way Permit application included if applicable (refer to Public Works checklist)
P staging plan included (refer to Public Work checklist) No dumoster,oarkinq or material storaoe
- allowed on roadways and shoulderc without written aporovat
d-Asbestos test and results submitted if demolition is occurring
F _ Architect stamp and signature (All Commercial and Multi family)
fl Full floor plans including building sc*iensand elevations(3 sets for remodels, 4 sets of plans for SFR
and Duplex, 5 sets of plans for MultFFamily and Commercial Buildings)
ff window and door schedule
(. Full structural plans, including design criteria (i.e.loads)
fl Structural Engineer stamp and signature on structural plans (All Commercial and Multi family)
INlh Soils Report must be submitted prior to footing inspection
a{l6, Fire resistive assemblies specified and penetrations indicated
F Smoke detectors shown on plans
y' fyp"r and quantity of fireplaces shown
Applicant's Signature:
Date of submittal:
Received By:
r Eartgexlcb
L' oJlA-tQ <^e
F: \cde\^FoRMS\PermiG\Building\buildingjermit. DOC Page 2 of 16 0210912005
PLAN CHECK FEES TABLE
. Dflatuleftof@mmunilyMopmdt
Building sf/fely and Inq&ian &rvi@s
75 h,ttt FtonbgeRoad
Vail, @londo 87657
970479-2138
FM 970479-2452
www.tnllgw.am
Plan check fees are required for proJects with a valuation over $100,000, at the time of Building permit
submitbl. Please use the table below to calculate your plan check fee tobl.
$100,000-$150,000 Multiply by
$150,001-$250,000 Multiply by
$250,001-$,100,000 Multipty by
$401,000-$750,000 Multiply by
$750,001-$1,000,000 Multiply by
.0055 of Valuation Tobl
.005 of Valuafion Tobl
.0045 of Valuation Total
.004 of Valuafion Tobl
.0035 of Valuation Tobl
Valuations over $1,000,000 will be calculated by the Town of Vall Bullding DepartnrenL
If you have any further questions, please contact the Town of Vail Building Deparknent at97047g-Ztag.
F:\cdev\FoRt"ls\Pennlb\Building\buitdnlpermilDOC Page 3 of 16 oas9pg05
oo|D[.sl|YEanElaFEM
Design
ACTXOI{ FORFI
Dsparfinont of f,.ommuntty llevelopment
75 South Frontage Road, Vail, Colordo 8165/
tsl: 970.{79,2139 faxzg7A.4W.2452
treb: wwunallgov.com
o
Review Bo€
ProJect Name: WLIIAMS RES. DOERIOR REMODEL
ProJect Dwipdon:
DRBNumber: DR8060163
FIML APPROVALTO REPIACE ROOF WIni A 50 yR SHINGIE, SIDING, \TVINDOWS. ADD 4
wINDOWS/DOORS
Parddpants:
OWNER HART, RICHARD H. & JANE y. 05/15/2006
l,IO1UONS RIDGE LOOP
VAIL
co 8165/
APPUCANT VICTOR MARK DOMLDSON ARCHII05/15/2006 Phone: 949-5200
PO BOX 5300
AVON
co 81620
ProJetAddres: 1401 UONS RIDGE tP VAII Loedon: 1401 UONSRIDGE L@P
tegal MpHon: Lot! 4 Blak 3 SubdMsion: LION'S RIDGE RL 2
Parcel Numben 2103-122{200-5
Comments: SEE@NDmONS
Modon By:
Second By:
Vob!
Gondldons:
BOARD/STAFF ACTION
Acton: STAFFAPR
Date of Appruualz 0610il2m6
Oond:8
(PLAN): No change to these plans may be made without the written consent of Town of
Vail sffiand/or the approprlate revlew commlttee(s).
Cond:0
(PI-AN): DRB approval dos not constitute a permit br buildlng. Please consult wlth
Town of Vall Bulldlng personnel prlor to constucdon acfivites.
Cond: 201
DRB approval shall not become mlid for 20 days followlng the date of apprcval.
Gond: 202
Approml of this project shall lapse and become vold one (1) year following the date
of final approml, unls a building permit ls lssued and consffuction is commenced
and is diligently pursued bward compleHon.
Oond: CON@08098
THE APPUCANT SHALI INSIATI THE NEW HARDIE PI.ANK SIDING IN A MANNER IN W}IICH NO CUI
ENDS ARE D@OSED. CUTS ENDS SHOUTD BE HIDDEN FROM VIEW BY OTHER PI.ANI(S, TRIM, ETC.
ono: cor,rteoee O
EVERY EFFORT SHALL BE MADE TO PRO'IECTTHE BCSilNG VEGETATION ON SITE. At'lY DISIURBE
AREAS WII BE REQI,'IRED TO BE REruRNED TO THE STATE THEY WERE IN PRIOR TO
CONSTRUCNON. nO TREE REMOVAIS ARE APPROVED AS A PART OF THIS APPUCATION.
Planner: Wanen Gmpbell DRB Fee Pald: $20.00
-A-t*!e/Er7v
June 1,2006
su$c e "il$flff.tilr c onsultants3'
Parker, Colorado 80134
T: (303) 699-7870
F: (303) 680-3192
Al Williams
PO Box 18420
Avon, Colorado 81620
Re: Asbestos{ontainingl\Iaterialslnspectlon
l40l Lions Ridge Loop, Vai! Coloiado
Dear Mr. Williams:
The purpose ofthis letter is to report the results ofthe testing for asbestos-containing materials(ACM) at the above-referenced address. The samples wereiollected on May 25, 20-06 at thelocations presented on Table I of the attached report, and were then analyzed on a rush basis. Asexplained in Section 5.0 of the.attached report, the sample re.zults indicate that the texturing ofthe rvalls and ceiling ofthe stairs and second level of the house contain ACM which will rJquireabatement prior to demolition or renovation if the ACM will be impacted. As explained inSection 4.0-of-the report' the Colorado Air Pollution Control Division must be notifi"d prior tothe.removal of 160 square feet ormore of regulated ACM. However, it is important tounderstand that any regulated ACM must be abated prior to renovation if it rnay be disturbedduring remodeling el'en if it is less than 160 squareieet in area- We can assisf you and yourconlractor in preparing an ab-atementrvork plan and identifying abatement subcontractors" if you
need this suPport and if you believe that any regulated ACM riitt l" disturbed during ,"nouuiion.
Please do not hesitate to contact us with any additional questions you may have regarding theseresults.
Sincerely,
SUNDANCE Exvmorrrclt[ Cotsurtl:{Ts, [Nc.
t7 n' '/l /qs[,.i^Wof
Robin M. Fryberger. p.E.
Principal Engineer
Attrchrnent
Chris Juergens" VMD Architects
File
Sundance Enr"ironmenta I Consuhants. Inc.
Environnrental Site .A.ssessments i Aquifer Characterization i Soil and Groundsater Remediation
ASBESTOS{ONTNIYING MATERIALS INSPECTION
1/t01 LIONS RIDGE LOOP, VAfL, COLORADO
Family Environmental proiect No. F06
May 2fi16
Prqared For:
Sundance Environmental Consultants, Inc.
Robin Fryberger
9432 Longstone Drive
Parker, Colorado E0134
Prepared By:
Family Environmental Compliance Senices, Inc.
3650 Chestnut Place
Denver, Colorado 80216033
Telephone 303-296-6A2
Fur303-292-1451
e-mail: FamilyEnvim@aol.com
TABLEOFCONTENTS
I.O INTRODUCTION
PageNo.
...1
2.0 BUILDING DESCRJPTIONS
32 Physical Assessment..-_-_.-....
3J Sample Collection.....-........--...23.4 Asbestos Sample Analysis .........24.0 RECULATORYOVERVIEW
5.0 FINDINGS AND RECOMMENDATTONS .............-..... ..-.-..-.36.0 GEMRALCOMMENTS.
APPENDICES
Appendix A - Asbestos Sample Summary
Appendix B - Asbestos Analytical laboratory Data
ASBESTO$CONTAII{ING MAITRIALS SI]RVEY
l40l Lions Ridge Loop, Vaif Cotorado
Project No: F06
May2006
I.O INIIRODUCTION
Family Environmental conducted an asb€stos inspection of the un occupied building tocated at l40lLions Ridge Loop,vail, Colorado' the inspection was conducted on May zs,z006by an accreditedBuilding Inspector. Interior building components rvere inspected and homogeneous areas of suspectasbestos'containing materials (AcM) were visually identified and documented. Although reasonableeffort was made to inspect accessible suspect materials, additional suspect but unsampled materialscould be located in wallg in voids or in other concealed areas. Suspoct ACM was sampled in generalconformance with the sarnpling protocols outlined in EPA regulation 40 cFR 763.g6 (AsbestosHa"ird Emergency Response Act, AHEM). Samples were delivered to an accredited laboratory foranalysis by polarized light micnrscopy.
1.1 Project Obiective
we undersgnd that this inspection was requested to prepare for the interior demolition and renovationof this shufire' colorado Regulation #8 and EPA regulation 40 cFR 61, National Emission
Standards for Hazardous Air Pollutants (NESHAP), prohibits the release of asbestos fiben to theatmosphere during renovation or demolition activities. The asbestos NESHAP requires thatpotentially regulated asbestos{ontaining building materials be identifid classified and quantifiedprior to planned disturbances or demolition activities.
2.O BUIIDINGDESCRIPTIONS
This is an older mountain side multi level concrete and wood singte family residence with a attachedgarage.
3.0 ACMFIELDACTTVTTIES
The inspection was conducted by Mr. Samuel Rolf a trained and accredited asbestos Buildinglnspector' The inspection was conducted in general conformance with the sampling protocols
established by EPA regulation 40 CFR 763.86, the Asbestos Hazard Emergency Response Act(AHERA). A summary of inspection activities is provided below.
l40l Llons Ridge Loop
Page2
3.1 Ylsual Assgsment
No blueprints, floor plans or other building documentatioa were provided to Family Environmental
preceding the inspection. Our inspection activitiec thereforp b€gan wifh visual observation oftheinterior of the building to identify homogeneous areas of susp€ct AcM. A homogeneous area
consists of building materials which appear similar throughout in terms of color, texture and date ofapplication. The exterior inspection included visual observation of the structure and the surrounding
areas only' Building materials which were not identified as concrete, glass, wood, masonry, metal or
rubber were considered suspect ACM. Fiberglass insulation was observed in various locations.
32 Physical Assessment
A physical assessment of each horirogeneous area of suspect ACM was conducted to assess the
condition of the material as friable or non-friabte. The EPA defines a friable material as one whiclq
when dqr, can be cnrmbled, pulverized or reduced to powder by hand pressurg. Friability was
assessed by physically touching suspect materials.
33 Sample Collection
Based on results of the visual observation. bulk samples of suspect ACM were collected in general
conformance with AHERA protocols. Random samples of suspect materials were co[ected in each
homogeneous area Samples were ptaced in sealabte containers and labeled with unique sample
numbers using an indelible marker.
Seventeen (17) bulk samples were collected from the homogeneous areas of suspect ACM. Bulk
samples were collected from the exterior siding tape joint compouod, and interior surfacing
materials. Homogeneous areas of suspect ACM identified and sampled during the inspection are
presented in Appendix A.
3.4 Asb€sto,s Sample Anatysis
Bulk samples wele submitted under chain of custo y procedures to Family Analytical t-aboratory
Services, Inc of Denver, Coloradq for anatysis by polarized light microscopywith dispenion staining
techniques per EPA methodolory (40 cFR 763, Subpart F). Microscopical visual estimation was
used in obtaining the percentage of asbestos in bulk samples. Family Analytical laboratory Services,
lnc is accredited under the Nationat Voluntary Laboratory Accreditation program NVLAP (2OO44g-
0).
1401 Uons Rldge laop
Page3
4.0 REGT'I"ATORYOVERVIHW
The asb€slos NESHAP (40 cFR Part 6l) regulates asbeetos fiber emissions and asbestos waste
disposal practices. It also requires the identification and classification of edsting building materialsprior to dernolition or renovation activity. Under NESIIAP, asbestosrontaining building materials
are classified as either friable, Category I non-friable or Category tr non-friable ACM. Friable
materials are those that, when dry, may be crumbled pulverizod or reduced to powder by handprcssure' Category I non ftiable ACM includes packins, gaskets, resilient floor coverings andasphalt roofing products. Category tr non-friable ACM are any materials other than Category Imaterials that contain more than l% asbestos.
Friable ACM and Category I and Category tI non-friable ACM which is in poor condition and hasbecome friable or which will be subjecte.d to drilling sanding grinding cusing or abrading andwhich could be crushed or pulverized during anticipated ,.nouution oi dernotition activities are
considered regulated ACM (RACI\O. RACM must be removed prior to renovation or dernotitionactivities' If the amount of RACM exceeds 260 linear fe€t of pipe insulation or mote than 160 squarefeet in other building components, the owner or operulor must provide the EpA, the State of ColoradoDeparfinent of Public Heatth and Environmen! Air Pollution Contol Division with writtennotification of planned removal activities at least l0 working days prior to the commencement of
asbestos abatement activities. Removal of RACM must be conducted by a trained and appropriately
licensed asbestos ahtement contractor.
The Occupationat Safety and Health Adminisfration (OSHA) Asbestos shndard for the construction
indusFy (29 cFR 19l0.ll0l) regulates workplace exposure to asbestos. The OSIIA standard
requires that employee exposure to airbome asbestos fibers be maintained below 0.1 asbestos fibersper cubic centimeter of air (0.1 f/cc). The oSHA standard classifies construction and maintenance
activities which could disturb ACM, and specifies wor& practicec and precautions which employers
must follow when engaging in each class of regulated work
5.0 IINDINGSANI}RECOMMENDATIONS
According to EPA, Colorado Regulation 8, Control of l{azardous Air pollutants, and the OSHA
regulations, an ACM is considered any material or product containing more than one percent (>I%)
asbestos.
Based upon sample results the textured watls and ceilings are considered Asbestos Containing
Materials (AcM).
The building roof was observed as a asphalt paper and wood shake shingles. The roof rnaterials were
not sampled within this scope of worlc, because it is not included in the AHERA criteria and becauseit would require desbuctive sampling techniques. The asphalt and tar impregnated roofing materials
are assumed to be ACM.
f,aOl
LlonsRtd8eLoon
According to the Colorado Regulation 8, Conhol of tlazardous Air pollutants, section III, part 3,Paragraph C (i) Roofing Materials:
'Tar impregnated roofing felts, asphalt tiles, asphalts and mastics that are non-friable and willremain non-friable during abatemint.r"
"*"rnp f-. this regulatioi.;,
According to the colorado Depafinent of Public Health and Environmenf Air pollution controlDivision, it is not necessaq/ to remove these materials prior to the demolition of the building.Additionally, the building debris need not be disposed as asbstos+ontaining waste material, as longas the ACM rernains non-friable, Howevern ttre tananlt receiving the asbestos+ontaining roofing
materials rnust be notified ofthe asbestos content.
According to the State of Colorado regulatory informatioq ACM roofing components do not need tobe removed as part of the asbestos abatement plan prior to demolition/renonutioo of the building.
However the demolition of the building cannot include explosives, sawing (rotary or reciprocating),grinding abrading blasting or intentional buming that wirr render the materiars friable.
Homogeneous areas of assumed ACM observed on site are included in Appendix A and thelaboratory anal5rtical reports are included in Appendix B.
Recommendations
Family Environmental recommends to have a certified asbestos abatement conFactor rcmove or abateall ACM identified prior to any demolition and or rcnovation activities that will impact the ACMidentified' There is approximately 12,000 to 14,000 sqFt of asbestos containing textured walls andceilings in the stain and 2d level. work safely and if you counter any other suspect material duringdemolition, have that material properly sampled and analyzed.
6.0 GEI\TERALCOMMENTS
This asbestos inspection was conducted in a manner consistent with the level of care and skillordinarily exercised by members of the profession currently practicing under similar conditions in thesame locale' The results, findings, conclusions and r@ommendations expressed in this report are
based on conditions observed during our inspection of the building. The information contained in thisreport is relevant to the date on which this inspection was perfomed, and should not be relied upon to
reprcsent conditions at a later date. This report has been prepared on betralf of and exclusively for useb1'you for specific application to your project as discussed. This report is.not a bidding document.
Contractors or consultants reviewing this report must draw their own conclusions regarding furtherinvestigation or remediation deemed necessary. Family Environmental does not warrant the work ofregulatory agencies' laboratories or other third parties supplying information which may have been
used in the preparation of this repon- No warrant5r, express or impried is made.
APPEIIDD(A
ASDESTOS INSPECTION
SAMPLEST]MMARY
TABLEI
SUMI{ARY OF ASBESTOS CONTAINING MATERIALS
Number 'JA)F Description PLM Results
sMwcl st25t06 Itrrtacmg material spray texture front entry
riehtwall ND
sM\y/c2 5n5n6 uufiacmg material spray texture east
lldroom east wall
ND
sMwc3 5f25t06 uufiacmg malerial spray texture above
landing
ND
@'"omsMw1c4s/25/06 Dunacng matenal spray texture above
fueplace 2nd levelsMwcs5t25t06urfiacrng material mrav texhrre dinino qree ND
NDsMlst2st06surtaqng material lower west bedroom
west wall
sM2 5n5/06 surtaong material lower west bedroom east
wall
ND
NDSM3sn5rc6surtacmg material lower west bedroom
ceiline
sMwc2-
I
5t25t06 Surfacingmateriffi
wall
ND
sMwc2-
2
5t25tO6 Surfacingmateriffi
interior wall
ND
sMw/c2-
3
5Ds/06 riuracrngmateriat Z'* level west side north
wall interior room
4% Chrysotile
TJI st25t06 -:-I ape Jotnt compound west kitchen counter NDTJ25/25t06 Japejoint compound end oFhal@6G
level
ND
TJ3 5/25t06 Tape joint compouna loGffii
bedrcom
ND
Extl 5n5to6 Tar wrap below wood siding NDEx€5D5t06 Tar v*'rap below wood siding NDExB5t25/06 Tar wrap Uelot" wood sidiiE ND
ND- None Detected
APPNNDD(B
ASBESTOS LA,BORATORY AI{ALYTICAL REFORT
lday 30,2006
Family Environmenral Compliance Senices, Iac.Attn: Sam tdolf
3650 Cberhdplace
Denver, CO 30216
Rq FECSI / l40t Lions Ridge Coop - - LGN 0t3591
DearMr. Rolf
Attached are the results ofpis'qpte na;;rs;ufr;.'.'tf;ffilXlltt#ffi#:c anassis @IM) ror a$estos conrained in the burk
BuIk samlrtes are anal].^d in^acrcorthlce with usEPA test n€{hod EpwffirH-g3il 16, which requires thatostrnctly differientrnareriats.orlayeo pro"or*itnio. rlpf. U"r_l,J-* r#nt *.*.rr.ffi i:H::|"{ilffi *:,::rl;.rv:.p,*=-iffi pg.y."g*i"grayeis,sucrraspaintor*ffiffiffif**ffi* 'votuntary Iaboratory Accrecrechnorogy(Mrri.'o*-nilT"-"il",ii#trffil
The analytical resrlts provide
-":i"9",+ *'n"ni;r -d;*lrrffi;sl
#t#oggtes actuailv submifred. rhis rwon isassociared with vou or vour o€€nizanb" 'rd. ,.fi ;*ffi"f,*T trffi;ffilgffi;;*triH#.ff lirffiI"ffrien to craim prdufi.ifrJJ'rrg g Ntrr.Ap or any-agenc-v orrhe u.s.Anarllicar;'-';;.'il;;'##"JJ1m:ff nrggm*]1ry;f, F;ff ilH;
ANALYST
I[*ra\e-LABOMTORY DIRECTORlktrq__Russell D. Cox
snroag
NVLAP LAB COOE
200.1.t8-0
3650 Chsstnuf_p_tace . Dsnver. ?nloradoge}l6Phons: 303-292-o079 ' r-., goi'>,gz-;;H"".' Fmait: FamirgEnviro@aor.com .iHfJ:il
;---.; AriarJrucar r4lorato"y St.., fnc.
\:po.t of TetnesulnpLM BnIk Asbesros A""$dr-_
Page I of7
CLIENT/pROJECT:@
P-?Tlglil! coMIvIENTs:- A[ s€parabre Fr," orravers ( exr:enr,.;-r ,-ffi'tff,"H#. corpo'.it" uoiio, ffi-;'rfiH lffilt#) within rhe seme sampre are anaryzed ad
A,natysr: i\*Albe.<
Russell D. Cox
Date:li126t2006
rarf.l,nalytical Laborato"y Sut .o rnc.
Report of TetResult. plMSulkAsb€stsAnatJEis
Page 2 of7
CUENT/pROJECT:%
"zolssesGTffiRA-
ffi ffi St#-Tffi;ny*mt#ffi ;'.gTJ ;..#tffi:) wirhin &e same umpre are anarped and
Anaryst: lt*ft3-'
Rrlssell D. Cox
Date:l5126/2006
F'amitfl natytical Laborato"y S..t, Inc.
Report of Test ResultspI,}I Bulk A$estos Anat5nis
Page3 of7
CLIENT, PROJECT: FECST / 140i Lions Ridqe Looo
&?Hffirffiroffi fl-gSb ptry.or l+en ( T.e!.p.y, ) wirhin the sasre sample are anarped andlli> l{on b"nilft.. __-.eo$re asbestos perceut is reported if 4|t-caUte.
Analyst:\*NQ--
Russell D. Cox
Date:0i126/2006
F'anilfinalyticat Laboratory S.r#." lo*
Report of TestResulb
PLIr{ BuIk AsbeSos Aralysis
Page 5 of 7
CLIENT/ PROJEGT: FECSI/ 1401 Lions Ridoe Loop
ADDfiONAL COMMENTS:. AII separable parts or lryen ! flcept paint ) njrhin fte sa.me sample arc anallzed andffi-:if; ,"siHH composite asb&oi pe.['; ;'.&;.d r qiuilur".
Anaryst: lt-0)e"-
Russell D. Cox
Date:QS/26/2AA6
BamilvQnatytical Laboraro"v S*i? n*.
Report of Test ResdtspLM BuIk A$esros Aut/sis
Page 4 of7
CLIENT / PROJECT: FECST / 14O1 Uons Ridqe Loop
ADDITIoNAL colvftElrr::j1-separable partsor tryers ( except paht ) Eithin the sane sample are amlyzed andffiiflr$;ffi. composite asbe*o' p"'bot i, n ionea uapiri'caure.
Anar-v-st: [\..J[bg"-
Russell D. Cox
Date:ll126t2006
F'a mi tytlnalyticat La boraro.y S.rr?e ro *.
Report of TestResultspIM EuIk Asbesos Atalysis
Page 5 of Z
CLIENT / PROJEGT: FECSI / 1401 Lions Ridoe Looo
PROPERTIE
#,'HHffi1rffi:fl-f-ry'.o* **.o'L."..s ( elcept paint ) Eithin rhe same sampre are aruryzed andNil= No* n t ffi. --*!o$te asb€stos percenr is reportea if A-pULOfe.
Analyst: [..JEe",--
Russell D. Cox
Date:05/2612006
Famiflnalyrical Laborarory su#q ro.,
Report of TestRstrIb
PLI4 BuIk Asbe$6 Analysis
Page 6 of7
% ASBESJOSTmLIBm
ADDnoNAL GoN{IvIENTS:. AIl sepsrable pats or lryers ( exceptlninr ) withiu the same ,ompre are arulyzed andffiif".HHS.compositeasbiros-;ffi ;'A;r.cirairi'olIe.
Anarysrt\JNe-
Russell D. Cox
Dxe:O5/26/2006
nannilylloatyricat Laborarorv s.*i? ro*
Report of Test ResulbpLMBuIkA$estosArat ds
PageT of7
CLIENT/ pROJECT: FECST/ 14Ol Ligns Ricroe Loop
ADDHONAL colvs/mm:fl:tpt9]:
ryry.* hvT { T..4paint ) wirrin the sa,oe saryre are anarped mdffiK:SlH conposite asbeso' p**t i, 6rt o roirii"ur.l "-- * rl
Anaryst: il*Q$q-
Russell D. Cox
Date:l112612006
-t-or-f
Uecrlptoh of Siteffocadon Sample&
Special Inshrrcdons:
Total Number of Samples:xeqEestedTunuroun* ('ry""flfiff'Ti*";
ReDnqdshed
Eecdved
Rel;'quished bi
Date/Tlroe
Datelllrne:
Received by:
Oiteiitme:
Date/fime:
uc\4Ap
%ftp*
AIHA pnrl
. PFOFICIENT.
LIONq
Sample Descriptiou
)i7 Day
slu,l,,.
pbonsB03-2r?f3r3t""*"r?:ar;-["fl
H*erf,rf-vrro@aor.com
TOWN OF VAILFIRE DEPARTMEN
75 S.FRONTAGEROAD
VAIL, CO 81657
970479-2135
VAILFIRE DEPARTMENT
AI.A.RM PERMIT
lzf0l LIONS RIDGE LP VAIL
llm1 UONSRIDGE LOOP
2to3t2202;m6
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
Job Address:
location.....:
Parcel No...:
Project No :
oe/L4/2006
09/L4/2O06 Phone: 970-409-9082
09/L4/2OO6 Phone: 970-949-4638
Permit #: Affi4081
Satus...: ISSLTED
Applied. . : Wll4lzffi
Issued. . : Wl20l20[6,
Expires. .: O3llglzffJil
s329.50
90.00
$329 ,50
s329 ,50
90.00
((t-T oto-6(qt
OWNER HART, RIEHARD I{. & ,JATIE Y.
1401 IJfONS RIDGE L@P
VAIIJeo 8L657
A9PIJICAIIT SIIA}IER IJIT'E SAFETY
DEBORAII IJ. SIIANER P.E.
PO BOX r.073
FRTSeOco 80443
License: C000001971
CONTRACTOR THI'IJ EIjECTRO}IIC SYSTEMS
P O BOX 534
AVON
eo 81620
Iricense: L1-2 - S
Desciption: niirnorn WIRELISS FIRE AI-ARM FOR DflSTING HOUSE
Valuation: $2,600.00
aa*r**a**8i*,|.'8f{.*****a*t|ia***a**'f$***{.****a*{.a**a***.*..{t*{*E*{.*|f*.*FEEstJMMARY.{dn|'#.a**{.'aa*ta'!*'a8$**$*
Electrical--- >
DRB Fee__>
Investigadon-- >
wil csll_>
TOTAL FEES->
$0. 00
$0.00
s0. 00
s0.00
$329. s0
Total CalculaEd Fees- >
Additional Fees->
ToEl Permit Fe€->
BAI.ANCE DUE__>
att{.€.r*,ltl.,lrr3tE,ir}t Ef.4*{4**{.*aa{.tia
Approvals:
Item: 05500 FIRE DEPARI!{EMf
09/L5/2OO6 DRhoades
be t/gn =
1r
Action: APPR Approved as noted. Scale on plans should
Heat detectors are required under stairs, if accessible Etorage area existe, and aleoin
any acceseible crawlspace(s) .
CONDITIONS OF APPROVAL
**i.{i8a*{.|*ict{6*a&a**&**{.'N.*aa*{t***s{.t*{.**s**'i{'**'**{d.{dd**{*|.{*{.*i4*t**'**{.tt**idt.{d'*{.a**a*&i**$**
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurat€ plot
plan, and state that all the information as required is correct. I agfee to comply with the information and plot plan, to comply
with all Town ordinances and stale laws, and to build this structure according to the towns zoning and zubdivision codes, design
review approved, Intemational Building aud Residential Codes and other of the Town applicable thereto.
REQIJESTTi FOR INSPECTION SHALL BE MADE TWENW-FOUR HOURS IN ADV v1rftrnoxr,rr479-2135 FRoNr B:00 AM - s mr.
/.\-
TO\ilNOFVAtr4
gtateaEFt &der: . .R96OO01tt9'
Electloaiss / ct.rCs611
- -;1 1.1
. Perrdit, for 406-OEg1 -TlFpe::, ,.ef,laiFlif''
'.Thib :patmeat:
'19r'90'
AprucAnsrt lror BE AccEprED rF t*com-Er,lt'sgryIil oL - ,Jte /ffi\t ";;iln{,ffiit
ffiil*o****,to*ffi/l rper.?sf,
Fronrage Rd. -iiiiiiafon sulmmal anb m,iet iniuuoe imompfron fisGd-on thE Vail, Golorado
O1OST'-
---- f oaqe oiiiilgto.m. Applisaflon wlll not bs acceptcd wlthout this
FireAlarm Contmctor:
Thrr\
Torvn of Va0 Reg. No.:
t\2- s
conHandPfpne#s:
Hihr tle.rl 9{j ,tuat,
E-MdlAddrss /\'. ^
ContraciorSlgnatrre: \ \ \)1v-A,- . -
compuere vniualot{8 FOR Al-AR[ll PERltlT {Labor & Matertab)
FirsAarm: S Zto0O.
dnirrtar* Eao,le Corrnttr Assessotrs Offire at l8l0orvlbft ww for Pareel
-
Parcef # 3 rB?'t,l.(!iLOOlo
Job Namo: \N\\\\a^.r Kesidm., ll '"0
*'*' \rlol U\or,rRtd\& "l.oo/, Vo.i \
Detailad Location of rsork: (i.€., foor, unlt #, Hdg. #)
llrrYo^lns*^*r.nn rt#
Detailed descripUon of rvork:-i]ilil"8"r"'^i^,-^ g-rn oisfl,. hs,.'." (n" "tltev *sJi\_-"r- '.rl.-_.-'
Work0lms: Ner( ) Addltitn( ) Rernodel( ) R$air( ) Re*roffytr Ottt€r( )
Tf.fBldrr.Stgl"-bmi y( ) Multi'famtly( ) Comrercid( ) Resoaurant( ) other( )
No. of Exisling Owame Unne
@vet-lNol
**!s*&e&***&****!s*&***r1t*s*f *****8****FOR Omc€OltILYs*sffi l.r*tsffi !&s****{*********:b*
rir_is'-
_*'.,"'il*:* _2Hfr:*,HH:si**
AETA{ENI
tr
\lVal@@ fr*
E
TOWNOFVAIL
75 S.FRONTAGEROAD
VAIL, CO El6s7
97447y2t38
ELECTRICAL PERMIT
Job Address: 12CI1 UONS RIDGE LP VAIL
location.....: lzt01 UONSRIDCEIOOP
Parcel No...: zl03l22:U2dl6
Froject No :
omrER mRT, RICIIARD H. & ,I3SIE y. 09/06/2A06
1-401. IJIOI{S RIDGE IOOP
1IAII.co aL6s7
APPIJIEANT DA}TTCT ELE TRIC
PO BOX 7246
BRECKEIqRIDGE
co 40424
Lricenee: 114-E
CO]UTR,ACTOR DAIiECI E&ECTRIC
PO BOX 7245
BRECKM{RIDGE
co 80424
Lricense:1L4-E
*n**** oF coMMnNrrY uwtpwrvr
NOTE: THIS PERMT MUST BE FOSTED ON JOBSITE AT ALL TIMFS
Permit #: Effi{152
09/a6/2006 Phone: 970-390-LL73
a9/06/2006 Phonei 970-390-1173
ISST]ED
wlMtxm
wtL3t20n5
03trzt?Nl
Desciption: CHANGEAND AD ORREWORKABOTI 80% OR ELECTRICALValuation: $0.00 SErare feen 2l0O
t*'N*r.afir*{*rN'i**{*ffi r*r!ffifirr'r.{.***d'st***{r{.a*{"t'r**r}*rrr:}*a*{.**rr FEE sl.IMMARyElec,tricat- >
DRB F€e___>
Iwesdgalion- >wmcdl->
TOTAL FEES->
$90 .85
90. 00
90. o0
93.00
s93 . Bs
s93.8s
90.00
s93 .8s
s93 . S5
$0. oo
Toml Cals ed Fe€s->
Addirloral Fe€s->
Toal Pernit Fee-->Payneds_->
BALANCE DT'E__>{d*{.4**'t'N!|{'rNf.{.S$ld*{ai.td#*&*at$*g{.***<'tar*8{4.t *t*r***F *aiAr!i*tot*&i*{dAt88**{.r.
Approvals:Iten: 06000 EIJECIR.ICA! DEPARII'IENT
09/06/2006 SH .Action: .AP
t*f{'qF*{r#*r{.*r****ifr,Fa&r'8tr;*{.t i*rN{*trFt't*t*rFit *tf{.${6r*t&td*8*{.***rN&.1iFit{*i#*i*a
CONDMONS OF APPROVAL
Cond: 12
(BLDG.): FIELII II'ISPECTIONS ARE REQIIIRED TO .'rrRCK FOR CODE COMPIJIAIiICE.
rFrttt r*ri!{.itlt'F8{tt'Flf'a**'i{a'tLa{daa**8t*{.*i*t*{.**rrtttit$t N*{t{tr}t'i*Kdri$**trait{.t*t '!tf{#s.ald'{.i*
DECU,RATIONS
I hereby achowledge thut t nau" read this application, filled orr in full the information required, complelsd an accurate plot
plan, and staie rhrt all the information as required is correct. I agree to comply with the informatisn and plot plan, to comply
with all Town ordinanses and staie laws, and to build this snusmre accordiry to the 0ows zoning and subdivision codes, desip
review alproved, Iaiernational Building and Residential Codes and other ordinances oftbe Town applicable thereto.
RIQUF,SiIS FOR INSECTION SHAII BE I\,!ADE TWBTITY-FOI'R EOIIRS IN ADVANCE BY IELEPHONE AT 4792149 OR
CTOR FOR HIMSELF AND OWNEF
PM.
o
*'i.'f'S'i'ftl.'[!a*'tt******f 'a*'t't,*:*,t****'r**'i:*'F*'i'i*****'t**'r***tf*!Srr'r***'a'F*ra***rt*rt*****'r**tt*'t't**tirr**'s!r
TOWNOFVAIL, COLORADO Statr,ne,nt
**'i't*'l'********rl!**,!rt,l'*rt*'*t***********:l,t'a'f*'f'a*'f*'N*'f!f*'**{.1 *'****'f'*'*!f*'f'**'**'*r*!*********'**'irtt ra*t***'f'8
gtatenent Nr$ber: R06000144L Amount: $93.95 O9/t3/2OO6t1:1? Altl
Palmeot Method: Check Irdt: LCNotation: #319g,/Danlcl
ELectr:Lc
Fermlt No: E06-01-52 Tlpe: EITEeXRICAII PERIqXT
Parcel No: 2LO3-L22-O2.OO-6
Site Addrese: 1401 LTONS RIDGE IJP \TAIIJIJocatio[: 1401 IJIONSRIDGTE IJ@P
TotaL FeeB: $93.85This Palment,: $93.85 Total AIfr Pmts: $93.F5
. Balance: $0.00*tttt'Nrltttt*t*'f$fX'iti'f i.tirr*i******rl***tt******aairtt tt tttSt'f*'tt$*'t:t*|l*'f**'Nr{r:t****t**l'i't*'i'i*tt,N*t*t rttN.rf
ACCOI,JNTITEM LIST:
Accou.o.t Code Descrlptlorl Current Pmts
EP OO1OOOO31111OO SLEETRICAIJ PERMIT HEES
WC OO1OOOO31128OO IEIJIJ CAI'IJ INSPECTION FEE
90 .85
3,00
-ffi75 S. Frontage Rd.
Vail, Colorado 81657
AppucAnoN?LL Nor BE AccEprED rr rncoupl#on RJ06 "{t1/r- L A, e-n 3fril*rt"#AUe-(Ys '( ,;i'**it*t*"fr
CONTRACTOR INFORMATION
Electrica I Contractor:
fiAtq gt-&f,ytaa T,u<
Town ofVail Reg. No.;il+-a Contact Person and Phone #'s:
0Nt0 fhftl\ 970-190 - t 17 3
E-Mail Address:Faxf,: 54]-qL2-
Contractor SigqOtt*F: -/ zr'
COMPTETE SQ. FOOTAGE FOR AREA OF WORK AND VALUATION OF WORK (Labor & Materials)
AMouNroF sQ rrrN srRUCruRE: 2t o0,5a Fr ELECIRICAL VALUATION: $o08 e
Qontad Eagle C.ounty Assessorc Otrre at g7o-328-86tt0 or visit for Patrel #
Parcel * 2t03 - lZzD- 2006
Job Name: wILl-,/fr/v\g "o/XtT'Ao^E Rt06L zoof
Legal Description ll tot:Block:Filing:Subdivlsion:
ownersNametfu Lwtu.tfttvls lAddress: /4At U06 fuA,4 MP Phone:
Engineer:Address:Phone:
Detailed description of work:
C r-'+{o oK Ft'L'-orzK 8oo/o D€ ELg"<rucil
WorkChss: New() Addition( ) RemodelQ{ Repair( ) TempPower( ) other( )
WorkType: Interior p() Exterior (2q) Both b(I Does an EHU exist at this location: Yes ( ) No K)
Typeof Bldg.: Single-familyffi Duplex( ) Multi-family( ) Commercial ( ) Restaurant( ) Other( )
No. of Existing Dwelling Units in this building: /No. of Accommodation Units in this building: /
Is this permit for a hot tub: Yes ( ) No (a()I l-E F ;e tr i',1 ;'fJ;nl l5 \z lq U Vi l- ,-',
Does a Fire Alarm Exish Yes ( ) No ( ) ll Does a Flre Sprinkler l4em exist: Yes ( ) ryp $
***************************************FOR OFFICE USE ONtY
t/
I********
*+u/'/
^41"
I
F:\Cde!AFORMS\PERMITS\BnildinS\decticalJ]ermit-ll-23-2005.DOC Page 1 of 2 LU25'n00/s
o
o
ffiffi:''**a;1,
I
Amendment to the 2002 N.E.C. Town of Vail Ordinance 4. Series of 2005
Overhead services are not allowed in the Town of Vail.
Underground services shallbe in conduit (PVC) from the utili| transformer to the electric meter, main
disconnect switch, and to the first electrical distribution circuit breaker panel.
The main disconnect switch shall be readily arcsible, andlocated next to the meter on the exterior wall of
the structure. All underground conduits are required to be inspected before back-filling the trench.
In multi-family dwelling units, no electrical wiring or feeder cables shall pass from one unit to another. Common
walls and spaces are uempt
NM Cabfe (Romex) an be ud only in single and multi-family dwellings net exceding 3 ston'ee.
Type tlM annot be used in any building mixed with Type A,B.EEH,I,M AS oeupancies,
Aluminum anductorc smaller than size #8 are not permitted with the Town of Vail.
. TOWN OF VArL ELECTRTCAL PERMTT GUTDELTNES
All installations of exterior hot tubs or spa's require a DRB approval from planning. This application will
not be accepted without a copy of the DRB approval form attached (if applicable).
If this permit is for installation of an exterior hot tub or spa on a new elevated platform or deck over
30" above grade, you must also obtain a building permit.
If this permit is for installation of an exterior hot tub or spa on any existing deck or elevated platform,
a structural engineer must review the existing condition and veriff that it will support the added
concentrated load. Please provide a copy of the structural engineers wet stamped letter or drawing
with this application.
If this is a remodel in a multi-family building with a homeowners association, a letter of permission
from the association is required.
If this permit is for a commercial space, two (2) sets of stamped drawings are required. Electrical
one-line and panel schedules are reguired if load is added or distribution is altered.
I have read and understand the above.
Signature Date Signed
If you have any questions regarding the above information or have additional questions,
pfease contact the Town of Vail Electrical Inspector aI97O-479-2L47. The inspector can be
reached on Monday thru Friday mornings between the hours of 8am and 9am. You may also
leave a voice mail and the inspector will call you back.
F:\cdev\FORMS\PERMITS\ELilding\el ectica Ulermit_ 1 1 -23-2005. DOC Page 2 of 2 ttlz3l2005
TOWN OF VAIL
75 S. FRONTAGEROAD
VAIL, CO 81657
970-479?138
Job Address:
Location.....:
Parcel No...:
kgal Description:
Project No :
: ISSI.JED: 08/09/2006: 0811512006: 02l1ll200fl
Status. . .
Applied . .
Issued.
Expires .
OWNER HART, RICHARD H.
140]. IJIONS RIDGE
VAIIJco 81557
APPI'ICAI{I R & H MECHANICAI
PO BOX 810
EAGIJE
co 81631
L,icense: 184 -U
EONTRACTOR R & H MECITANIEAL
PO BOX 810
EAGI-,8
co 81631
I-,icense : 184 -M
Desciption: ADD RADIANT HEAT
Valuation: $8.500.00
Fireplace Information: Reshicted:
Mechanical-- >
Plan Check-- >
Invesdgation- >
will cdl--- >
08/09/2006
08/09/2006 Phone:
08/09/2006 Phone:
& iIANE Y.
LOOP
I-rIJC (970) 328-2699
(970\ 328-2699
# of Gas Appliances: 0 # of Gas Inss: O # of Wood Peller 0t++*+*{.*{.+ti'**t:f*********'l**,.|i*******************t+**{.:}*tt*:l{.*{.**,.*+
LIJC
9228.00
Item: 05100 BUILDIIIG DEPARTMEIIT
Oa/o9/2oo6 Js Act,ion: Ap
CONDITION OF APPROVAL
Cond: 12
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond: 22
(BLDG. ) : COMBUSTION AIR IS REQUIRED PER CHAPTER ? OF THE 2003 IMC AllD SECTION
304 OF THE 2OO3 IFGC AS MODIFIED BY TOWN OF VAIL.
Cond: 23
(BLDG.): BOIII.ER TNSTALLATION MUST CONFORM TO MANUFAETI'RERIS INSTRUETTONS AND
CIIAPTER 10 OF' TI{E 2OO3 TMC.
Cond: 25
(BI"DG.): GAS APPIJIA}ICES SHAI.'L BE VEMTED
Cond: 29
(BI,DG. ) : ACCESS TO MECIIA}IICAL EQIITPMENT
IME AND CHAPTER 3 OF THE 2OO3 IFGC..
Cond: 31
$180 . 00 Reshrarant Plan Review- >
$4s.00 ToTALFEES--------->
$0.00
$3 .00
$0.00 Tolal Calculated Fees-->
Additional Fees------>
Total Permit Fee---------- >
Paynents---------- >
BALANCE DUE-------->
AECORDING TO CHAPTER 5 OF THE 2OO3 IFGC.
MUSf COMPI-,Y I'IITH CHAPTER 3 OF THE 2OO3
s228.00
s0.00
$228.00
$228.00
s0.00
Qrr*r*r*r oF coMMUNrrY DEV*PMENT
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
MECHANICAL PERMIT Permit #: M06-0211
I4O1 LIONS RIDGE LP VAIL
1401 LIONSRIDGE LOOP
2103122U006'f RsoG -6 tc. \
(BLDG. ) : BOILERS SHALL BE MOIINIED ON FIJOORS OF NONCOMBUSTIBIJE CONST. I]NLESS
rrsrED FoR MorrNrrNG or{ "o""tr"* FrJooRrNc.
Cond: 32
(BLDG.): PERMIT,PIJA}IS A}ID CODE ANALYSIS MUST BE POSTED TNMEC}IANICAT ROOM PRIOR
TO AN TNSPECTION REQI'EST.
Cond: 30
(BI-,DG.): BOIL,ER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRi\fN OR OTHER APPROVED
MEJANS FOR DISPOSING OF LIQUID }fASTE PER SECTION 1"004.6.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this stucture according to the towns zoning and subdivision codes, design
review approved, International Building and Residential Codes and other ordinances ofthe Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOT,JR HOTJRS IN ADV
PM.
AT 479-2149 OR AT OIJR OFFICE FROM 8:00 AM - 4
OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNEI
Aug, 3, 2006 '.11ii RU'ECHANICAL N0,8750 P. 2
qb.orQ
Bulldlng Permit#:
Mechanical Permit #:
97 0-479 -2149 (Inspecff ons)
Permit witl not be accepred witnout ttreEfiowiffi
f\o("-oztl
75 S. Frontage Rd.
Vail, Colorado 8t 652
MECHANIOTL: $ $,fuA *
Qfficp at 970-38-864O or yisit for Parrel ,
:tol*^*u|lh;*- Pto,tob Aftlffi luno,,rrh,,,, fu
Lesat Desoiption ll rou {Bloclt;FilinE: 2-.'suaav,saoru"frt4$ fu&c_,WFqJggt*
, \,'.ot.;d t
Engfneer: e Address:Phone:
y"-.*' .N;l , .**
Boiler Location: IntarorQqf fxtenror 1 1 O*rer ( )DoesanEHUo<istat$islocationl yes( ) .No( )
TvpeofBldg:sLnglefamily( ) Dupre(( ) MuttFfamily( I c"mn"*'nt t I nrta"nnt( )odrer( ) .
No, of Exlsting Dwelling Units in this building
Is this a conveGion fror u
-
++,t*,F:F,f *rf :|. **:fi ,F********* *FOR
Aue, 3, 2006 9:48AM -ry
t t t^
li:: erlc worhcheer
No,8750 P, 3
Rl1-.99 R1F.o5Z Ftil0:.0i3 R2.8=.35'/
FLOORS
AREA-RUmq
l3 ot
R VALUE
{l
u UA DT.qTU! REC ONTFI]T
,010 !t7,{ .
5o-o
1o'to57I
CEILING l5t5 30 , o33 '10'( toa
WALLS 3 Vby
I Iq ,o57 170,3 fo"(6127
WINDOWS 4tz t, ,'Y .35'7 tl Z,l lo'tlVFq
INFILTRATION Lfz6o
I
L5,y
/ r*o
(3,1
x.75
tgf.y'
/ o.te
Jo"lZr 9oI
coryR^croRt hrW2ogvNt Ft14&S 5y ?tt I
W* t3q Z"/"[u , co &tag tJ"o: 15 sgl
PER[4IT*
rQTALBrus: ?#T7
JoB r{AMe lilrwtp)5 Fur,_______:^,
DEErrrr -tr- '
,\- ",ra5F,-
w,
.tElt:
' L-l r
tsJ
' Ca I
t
,. 1
"L . a
h?
1Fp
s
(iv
1'{
,{
ll:rl
ii'
a.ll-IV
I
I\J
rn
t-
+,
P,4No, 875 03, 200 0,d0 IR&tt rvttctlnutcnAu
-\-{J'ec^,. q*
.h(
\f
I
.L
!^l tfi
tF i,
(
I
TOWN OF VAIL
75 S. FRONTAGEROAD
vArL, co 81657
970479-2t38
*n*rt"Nr oF coMMUNrrY o"utnrr*t
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
MECHANICAL PERMIT PErMit #: MO6-0250
-B6i6_6(5-1
Job Address: 1401 LIONS RIDGE LP VAIL Status . . . : ISSUED
Location.....: l40l LIONSRIDGE LOOP Applied . . : 09ll5l2ffi6
Parcel No...: 2lO3l22VN6 Issued . . : 0912012006
l,egal Description: ,<-\.i)..-F-tt-r ,A ( q \ Expires . .: O3l19l2C[7
Project No : '?RSoG -o tn \
owNER HART, RTCHARD H. & ,]ANE y. O9/a5/20O6
1401 IJIONS RIDGE IJOOP
VAIIJco 8L6s7
APPLICANT SIITTON TNSIITTATING V{FST, INC .09/15/2006 phone: 970-945-1313
s398 CR 1s4 #1
GLENI,{OOD SPRINGS
co 81601
License : 2I9 -Yl
CONTRACTOR SUTTON TNSIIITATING WEST, INe. 09/15/2006 Phone: 970-945-1313
5398 CR l_54 #1-
GLENWOOD SPRINGS
co 81601_
License: 219-M
Desciption: INSTALL GAS FIREPLACE WITH B-VENT FLUE
Valuation: $5,950.00
Fireplace Information: Restrict€d: # of Gas Appliances: 0 # ofGas logs: 0 # of Wood Peller 0
***dr**i(******1r**rl
Mechanical-- > S120 . 00 Restuarant Plan Review-- > go . oo Total Calculated Fees-- > 9153 .00
Plan Check-- > $30 . 00 TOTAL FEES-----------> g1s3 . oo Additional Fees------> go .00Investigation-> $0.00 Toial Permit Fee------ > 5153.00wlrcau-----> g3.oo ilffffi;;;-::_:.._l *rii:ll
ITem: O51OO BUII,DING DEPARTIT,IEI{:T
O9/L5/2OO6 egunion Action: Ap
CONDITION OF APPROVAL
Cond: 12
(BI-,DG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPIJIANCE.
Cond: 22
(BLDG. ) : COMBUSTION AIR IS REQUIRED PER CIIAPTER 7 OF THE 2003 IMC AtiID SECTION
304 OF TI{E 2OO3 IFGC AS MODIFIED BY TOWN OF VAII,.
Cond: 23
(Br,DG.): BorrLER rNsrArJIJATroN MUsr coNFoRM To MANurAcruRER,s rNsrRucrroNs AND
CHAPTER 10 OF THE 2OO3 IMC.
Cond: 25
(BLDG.): GAS APPLIANCES SHAI-,L BE VEIITED ACCORDING TO CHAPTER 5 OF THE 2003 IFGC.
Cond: 29
(BLDG.): ACCESS TO MECI{ANICAL EQUIPMENT MUST COMPLYWITL CHAPTER 3 OF THE 2003
IMC AND CHAPTER 3 OF THE 2OO3 IFGC..
Cond: 31
(BI-,DG. ) : BOILERS SHALL BE MOIINfED ON FLOORS OF NONCOMBUSTIBLE CONST. ITNLESS
IJrsrED FoR MottrvrrNc oN "o*"ilr"o' FrJooR'.rc.
Cond: 32
(BL,DG. ) : PERMIT; PLANS AIID CODE AIIAIYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR
TO A}I INSPECTION REQUEST.
Cond: 30
(BI.,DG. ) : BOILER ROOMS SHALIJ BE EQIITPPPED WITH A FLOOR DRAIN OR OTHER APPROVED
MEANS FOR DISPOSING OF I.,IQUID WASTE PER SECTION 1004.6.
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design
review approved, International Building and Residential Codes and other ordinances ofthe Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOIIR HOURS IN ADVANCE BY TELEPHONE AT 4?9-2149 OR AT oUR OFFICE FROM 8:00 AM - 4
PM,
SIGNATURE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNET
********************,F*{.{.***+**{.*******+***+*************{.'{.+*+*++*++****!t********************
TOWNOFVAIL. COLORADO Statement
**{.4.{.:1.************************{.*:************i.*********{.**+*d(**'t********* * * *** *******{.*{.**{.**
Amounr: $25,00 09/2e/200672:36 PMInit: LTNotation: alerefi\t Lopes / ck
Statement Number: R050001563
Paymerrt Method: Check
1"400
Permj.t No: M06-0250 Type: MECHANICAL PERMIT
Parcel No: 2LO3-L22-0200-5
SiTE AddTESS: 140]- IJIONS RIDGE LP VAII'
IJocation: l-401 LIONSRIDGE LOOP
Total Fees:
This Pavment:$2s.00 Total AI,t Pmts :
Balance :
i.** *+***,t***************:1.**+{.**{.*:}:t,s:}**{.****4.*****{.{. *************{.*{.*********.******i.********
$1s3.00
$1s3.00
$o. oo
Current Pmts
ACCOTINT ITEM LIST:
Account Code
MP 0 010 0 0 0311110 0
PF 00100003112300
Descript ion
MECHANI CA! PERM]T FEES
PI,AN CHECK FEES
20,00
5.00
Coo*rrrNr oF coMMUNrrY orutnrr*,
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
MECHANICAL PERMIT PCrMit #: MO6-0250
Job Address: l40l LIONS RIDGE LP VAIL
Location.....: l40l LIONSRIDGELOOP
Parcel No...: 2lO3l22QZ006
OV\INER }IART, RICTIARD H. & irANE Y. O9/L5/2O05
1401 IJIONS RIDGE IJOOP
co 816s7
Appr_,rcAl\n suTToN rNsttATrNG wEsT, INC.09/L5/2006 phone. 970-945-L3L3
s398 CR 154 #1
GLENWOOD SPRINGS
co 81601_
License: 219 -M
CoIVIRACTOR SIIITON INSTTJATING WEST, IITC. 09/L5/2006 phone: 97O-945-L3L3
5398 CR 1_54 #L
GLENWOOD SPRINGS
co 8t_601
I-,icense : 219 -M
Desciption: INSTALL GAS FIREPLACE WITH B-VENT FLUE
Valuation: $4-500.00
TOWN OF VAIL
75 S. FRONTAGEROAD
VAIL, CO 81657
970-479-2138
lcgal Description:
Project No :
Plan Check-->
Investigation->
Will Call---- >
(Wb- oLlt
$25.00 TOTALFEES-------->
$0.00
93 .00
Fireplace Information: Restricted:,l:F*:i:t****:t*{<*+**r(******{<***t(*****t(****+*:*******'id.'it!:B**'****t rtr(+:f **:f :N* FEE SUMMARyMechanical--> S100.00 Resoarant Plan Review->
Status...: ISSUED
Applied. . : 09ll5l2ffi6
Issued. . : 0912012006
Expires. .: 03ll9l2m7
# ofGas Appliances: 0 # ofcas Logs: 0 # of wood Peller 0
g0.00 Total Calculated Fees--> 5128 - 00
S128.00 AdditionalFees----------->$0. 00
Total Permit Fee-----> $r-2s.00
Payments----------- > $128.00
***1t**i<*****************************x*xx***li:t:t*'t*)i'l*'!*++**:!:t*i.x:}:F+*+:|::}*:******+******
Item: 05100 BUILDING DEPARTMENT
09/L5/2OO6 cgunion Action: Ap
CONDITION OF APPROVAL
Corid : 12
(BL,DG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE.
Cond:. 22
(BL,DG.): COMBUSTION AIR IS REQUIRED PER CHAPTER ? OF THE 2003 IMC AND SECTION
304 OF THE 2OO3 IFGC AS MODIFIED BY TOI{N OF VAIL.
Cond: 23
(BI,DG.): BOIILER INSTALI.,ATION MUST CONFORM TO IVTANUFACTURER'S INSTRUCTIONS AI{D
CHAPTER 10 OF THE 2OO3 IMC..
Cond: 25
(BLDG.): GAS APPI-,IAIiICES SI{AI-,L BE VEMTED ACCORDING TO CHAPTER 5 OF TI{E 2003 IFGC.
Cond: 29
(BI-,DG. ) : ACCESS TO MECHANICAL EOUTPMENT MUST COMPLY WITH CHAPTER 3 OF THE 2003
IMC AND C}IAPTER 3 OF THE 2OO3 IFGC.,
Cond: 3l-
(BI,DG.): BOILERS SIIALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE CONST. ITNLESS
r,rsr'D FoR MorlNrrNG oN "o*"ailr"oE FLooRrNG.
Cond:32
(BLDG.): PERMIT,PI,ANS AND CODE ANALYSIS MUST BE POSTED IN MECIANICAI-, ROOM PRIOR
TO AN INSPECTION REQUEST.
Cond: 30
(BL,,DG.): BOII-,ER ROOMS SHAITL BE EQUIPPPED WITII A FLOOR DRAIN OR OTIIER APPROVED
MEANS FOR DISPOSING OF I-,IQUID WASTE PER SECTION ]-004.6.
DECLARATIONS
I hereby acknowledge that I have read this application, frlled out in full the information required, completed an accurate plot
plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design
review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOT RS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4
PM-
lLa14 -lr zs
SIGNAT{'RE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNEF
,F,t* * * * * *,1,& * * ** * * * *+*****+* * * * * * *:** * * ******rt,N.*+**. *rr'**'*'**,t'!*****:t+********* * * *.* **'N.{.*** ir( * '}ik,r't'r*
TOWNOFVAIL. COLORADO Statement
:t,t *,1.r. * {. t {. * {. d.* !F * *,F * *+{.***** * * * **** * 't:t'}****t **'*********'}**** *********{.*****{.
'tt
** *******'ti *'t *{.** 't
Statement Nuriber: R06000L48?
Pa]rment Method: Check
ck13 9 5
Amount: $128.00 09/20/2006L0:52 AMInit: I-rTNotation: ,feremy Lopez /
Permit No:
Parcel No:
Site Address :
Location:
This Payment:
MP 00L00003111100
PF 0010000311.2300
wc 00100003112800
2103-L22-0200-6
1.4 O 1 LIONS RIDGE LP VAIII
1401 LIONSRIDGE LOOP
T]4)e: MECHANICAIJ PERMIT
TotaL Fees:
Total ALL Pmts :
Balance :
M06 - 025 0
$128.00
* * + + * * + * * + + + + + + + + + + * + * * * * * * * * * * * * * * * **********:*:* **:*:! * *:* * * * * * *********************+'f +******+ *
ACCOUNTITEM LIST:
Account Code Description
s128.00
$r"2B. oo
$0.00
Current Pmta
MECHANICAL PERMIT FEES
PI,AN CHECK FEES
WILL CALI, INSPECTION FEE
r_00.00
25.00
3 .00
0g/u/200$
'.^ #
TIU 1$:08 m
6
002/003
i.,,
-afl
I0vtil fiot"-ozro
Frcvide trleclranical Room Layout drawn b $c6le to intiludetE ]'/ted|5nics I Room Dimcndonso Gsmbus1:ion Air Duct Si4 and locadono Fluc, Vcnt end GaF Lr'n€ Sizs and locadono HeEt toEE Catcs.o EguipmentCut/SpecShe€t$
.tg
Pennlt wlll.not be acepted without.the follovrring:
nbudrwsz/t/fi| Lja\A
,&.
Work class: tlew ( ) Addithn {Aterauon (Rcp6b( ) Odler( )
Does an EHU eodst Et this lo€Uon: Yes ( ) No ( )Boller Locohlon: Intcrior ( ) Etteriqr ( ) Ofier ( )
TypesfBldg: slngl*tunily(f/ Dude<( ) Muld+afiily( ) commercial{ ) R€#urant( ) Other( )
No. of ftistinE Dwelling Units in this buildinE:
No/fype of Fiteplaoes Proposerl: Gas Appllancee ( ) Gas LoSs ( ) Wood/Pellet ( ) Wood Eumlng (NOT AILOWED)
*ls***lG* *rfi *****tl.tl.tl.:fi :*:lE*rr:G+FoR :tF!B!GrF* ** **d(d6*{C {c *r|trf **!FtF*:F*+ir
rrt75lzoosF:\ode\4FoRMs\Femlts\Eulldln fidrrnicglncrmiLll-23-Z005.Doc : i
ft{
0g/14/2006 TIU 16:08 FAI ++-r-Vail $/003000
TOWN OF VAIL
75 S.FRONTAGEROAD
vArL, co 81657
9',1u479-2138
Job Address:
Location.....:
Parcel No...:
Legal Description:
Project No :
Plumbing--- >
PIau Check-- >
tnvestigation- >
Will Call---- >
Permit #:
Status, , . :
Applied. . :
Issued. . :
Expires , .:
Y. 08/04/2oo5
08/04/2006 Phone: 970-390-1138
08/04/2006 Phone: 9?0-390-1138
# ofGas Logs: 21 # of Wood Paller ??
P06-0081'3cc -o(s-1
ISSUED
08/04/2006
o8t07lzm6
wt03l2w7
# of Gas Appliances: ??
*r<:i********ra:*:trr,*:a:*:F:i****x*****+*t$'i,trt1.*++,a:Ft*:|+:l:a,*:f *:t:F!t:t:F+:f :t ++ra:|:*t+++ FEE suMMARy
{**{**:f*rtiF**++r.+***{r*t rt*rr**tr*:tr,r.**ii**t********** ***+*+**+*+ *
$50.00 Resnmrant Plan Review->
$1s.00 ToTALFEES----------->
s0 .00
$3.00
go. oo Total Calculated Fees-- >
$?e. oo Aeuitional Fees------>
Total ?ermit Fee------ >
Paymefts---------- >
BALANCE DIJE-.---- >
$?8.00
$0.00
$?8.00
$78.00
$0. 00
Or*o*rrrNr oF coMMr.JNrry pevtp^aeNr
NOTE: THIS PERMIT MUST BE POSTED ON IOBSITE AT ALL TIMES
- PLUMBING PERMIT
1401 LIONS RIDGE LP VAIL
I4Ol LIONSRIDGE LOOP
2103t2202M
?ffiac -ot"t\
OWNER HART, RICHARD H. & ,tAt{E
]-40]- LIONS RIDGE LOOP
VAII-,
co 81657
APPLICANT,I S & M MECHANICAII
P.O. BOX 9338
AVON
co 81620
License: 280-P
CONTRACTOR J S & M MEEHANICAIJ
P.O. BOX 9338
AVON
co 8L620
License: 280-P
Desciption: ROUGH IN LOWER LEVEL BATH
Valuation: $3.500.00
Fireplace Information: Restricted: 't?
IIEM: O51OO BUIIJDING DEPARTMEI\II
oe/04/20o6 JS Acrion: Ap
CONDITION OF APPROVAL
Cond: 12
(BIrDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPI-,IAIiICE.
DECLARA'TIONS
I hereby acknowledge that I have read this application, filled out in frrll the information required, completed an accurate plot
plan, and state that all the infotmation as required is correct. I agree to comply with the information and plot plan, to comply
with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design
review approved, International Building and Residential Codes and other ordinances ofthe Town applicable thereto.
REQI,]ESTS FOR INSPECTION SHALL BE MADE TWENTY-FOIJ'R HOI]RS IN ADV
PM.
AT 479-2149 OR AT OI.JR OFFICE FROM 8:00 AM - 4
+********************1.**:t*******,*,t*'***************************'**********{r******{.************
TOWNOFVAIL. COLORADO Statement
************************t*****************,!******'S************************,t,t**:*!t********'f***
Amounr: $78.00 o8/07 /200603: s4 PM
INiT : IJT
Notat ion: JS&M
Statement Number: R050001129
Palment Method: Check
Mechanical / ck#3809
Permit No:
Parcel No:
Site Address :
LocationI
This Payment r
PF 00100003112300
PP 00100003111100
wc 0 010 0 003112800
P06-0081 Ilrpe : PLIIMBING PERMIT
2LO3 -122 - 0200 - 6
14 01" IJIONS RIDGE IJP VAIL
].40T I.,IONSRIDGE IJOOP
$78.00
Total Fees:
ToEal ALL Pmta :
Balance :
$78.00
$78.00
$0.00********++++**:1.:tr,F'F+********,F**********.t **,t {.{.*******{.:N.***************:t ,t******+*{.**{.,t**{.**'t ***
ACCOI]NT ITEM LIST:
Account Code Deseription Currerrt PmLs
PIrAN CHECK FEES
PIJT]MBING PERMIT FEES
WIIJII CAIJII INSPECTION FEE
15.00
50.00
3.00
AppLrcATrolrLL Nor BE AccEprED rF rNcoMpLtR
Toa oo8(
CONTRACTOR IN FORMATION
Building Permit #:
Plumbing Permit #:
970-479-2119
IJJ/VNOFYAIL
75 S. Frontage Rd,
Vail, Colorado 81557
bw8(
Plumbinq C.ontractor:efu,L/ Ad,^A-Town ofVail Reg. No.:
,4.n - P CoDtact and Phone #'s:/wt* -.- E// - /Sa
E-MaL eddress:" /1b/?die^ U+)aaA .
Contractor Signaturei 1 /_-,,"_*-,-,Y"-.-'".I-_ ..a rv6
COMPLETE VALUATION FOR PLUMBING PERMIT (Labor & Materiats)
PLUMBING: $
Contact Assessrc Office at 970-328-8640 or visit for Parcel #Parcel# .1 /n..4 / ", "\ n .t \0O
robNanet r4/?)t fuddu-c!.-)rob Address: l{Ot .fu'na'uzg et-
Legal Description ll totl Block:Filing:Subdivision:
owners Name:/trta il"m Addres*/ Eh/ -r{ /rut,c, 1, l*-,Phone:
Engineer:Address:Phone:
Detailed descriotion of work:
flert ilo .rL-t l^,1 .A rluSv.
Work Class: New ( )Addition t1) Alteration ( )Repair( ) Other( )
Type of Bldg.: Sinole-famillf ) Duplex ( ) MultFfamily ( ) Commercial ( ) Restaurant ( ) other( )
No. of Existing Dwelling Units in this building: /No. of Accommodation Units in this building:
Is this a conversion from a wood burning fireplace to an EPA Phase II device? Yes ( ) No ( )
*******i******************{r************FOR OFFICE USE ONLY**r.****rr*****************************
\Wail\data\cdev\FORMS\PERMITStfLMBPERM. DOC
18-
07D6n002
OFVAIL
FRONTAGEROAD
87657
138
DEPARTMENT OF COMMUNITY DEVET,OPMENT
NOTE: TI{IS PERMIT MUST BEPosTED oN J0BSITEAT ALL TIMES
ADD/ALT ST,X. SI.n-D PERMIT
Job Address: l,l01 UONS RIDGE Lp VAILlncation.....: 1401 UONSRIDGEI.oOf-
Parcel No...: ZIU3L1ZV4(I|5
Permit #: 8064159
Project#PRI06{lgl
Stafis. .
Applied.
I$sued .
Expires -
06/2L/2006
05/2:../2006 phone: 97o-g45-9o9g
ISSI]EI)
Mlzrnmf
ut2u2ffi
0Ut7t2w7
OIVNER mRT, RICEARD H. & irall8 Y.1401 IJTO}IS RIDGE IOOP
VAIIJ
co 81557
APPlrreelm WooDSTONE IIOMES, INC.P.O. BOX 3939
\TAII,
co 81658
Iricense: 149_A
colitTRAcTOR WOODSTONE HOMES, Ilrc.P.O. BOX 3939
VAIIJ
co 81558
Lricense:149_A
05/2L/2O06 Phone: 970-845-9698
D&ription:
REPIACE ROOF WII.H A_lo rR SHINGIJE, SrDINc, wnroows, ADD 4T{INDOITS/DOORS, NEIV KITCHE}I, NEIIO'iTR IJEVEL BATII.
Ocorpancy: R-3ru
Type Construction: V-B
Valuarion: $60,000.m Revision Valuation: $0.00 Toal Sq Ft Added: 0
FEE SUMMARY r*r:.*r**trH...*ttftrffi**s*'t't*:.r*r*r*ar+tffi,F?|t ?*rifi$0.m Total Calqdsed Fcca->9t.00 Addirionat Fees_>$1,1$.69 Total Permit Fec-->Payarffi-;'
EAL-ANCE DUE__> 9t.00
+}i**r*;rttat:rit*t|l *r****l'******|||?r*fr.|r**ar*B+t*{,*a.:FF|!i*+
Building-> S713.?5 Res$araDt plan Revicw_>Phr Cbeck-> W.%. n.cr"arim'p[__'-_;IDs€stiSntio!-> $0.00 TOTAL FEEi_>will chll-> s3.00
$1,180.59
$lz.m
$1,305.69
$1.305.@
Approvals:
Item: 05100 BttIIJDINc DEpARItt{Et{T
o7/L9/2oO6 caunionpermit required prior toItEM: O54OO PI,A}II{I-ING DEPARIITBNT
i . 06/23/2006 wirrsr
asbestos abatementthe building permit.
Actiou:
issuaace
Act,ion:
ap
of
: 05500 FIRE DEPARII{ENro6/n/2a06 J,JR Action: Apalarm sygtem recormended.Fire sprinkler system recomended.: o5500 pItBIrIe WORKS
Monitored fire
section of this Documed for auy frat may ap,ply.
.,,} \ ti,rt '
I ,o Ir i "
,{
Requested Inspect Date:' Inspec{ion Area:
Site Address:
^ Type: B-ELEC
uccuoanc,\/:
& JANE Y.'
Monday, December 18, 2006
1401 LIONS RIDGE LP VAIL
1401 LIONSRIDGE LOOP
SubTgRe: ASFR
A/P/D lnformation
Requested InsDec.tion(s)
Inspection Hlstorv
Status: ISSUED
Insp Area: SH
09:30 AM
970.390-1173
DGOLDEN K
ilurl'
AIRTIGHT RATED OR
Phone: 970-390-1173
Phone: 970-390-1173
OR REWORK ABOUT 8OO/O OF ELECTRICAL
(rPftuItem: 140 ELEC'llidC I
estor: DANICI ELECTRICRequestor: DANICI ELECTRICCoriments: reinspect, will call 390-1 173
Assioned To: SHAHN- Action: Time Exp:
Requested Time:' Phone:
Entered By:
]tfu*I $*u
Item
Item
Item
Item
Item
110 ELEC-Service
120 ELEC-Rouoh
o9D2tO6 |
Gomment:
130 ELEC-Conduit
140 ELEC-Misc.
190 ELEC-Final
REPT131 Run Id:. 6L42
I?frTloou lnspec$LT
Fe,{luFql
R.eporting eage go
Requested Inspect Date: f[ursday, December 21, 2006
Inspection Area: CG
Site Address: 1401 LIONS RIDGE LP VAIL
1401 LIONSRIDGE LOOP
A/P/D Information
Activitv: 806-0159
Const Tvp6:Orrier: HART. RlApolicant WOODSI
Cohtractor: WOODS]
Description: BEP-|=A_Q!
A-BUILD SubTvoe: ASFRUbe: V-B
Status: ISSUED
Insp Area: CG
PUBLIC WORKS AND FIRE. JSUTHER
ACM AREAS ARE DISTURBED. - JSUTHER
Reouested Time: 10:00 AM' Phone: 970-845-9698
Entered By: JMONDMGON K
The front door
Comment:
Comment:
Requested Inspection(s)
Item:
Requestor:
Coniments:
Assioned To:- Action:
Comment:
Action: CR CORRECTION REOUIRED
ING AND SIDE OF BOTH FIREPLACE TO MAINTAIN REOUIRED
Action: AP APPROVED
WESTWINDOW.
Action: COND APPROVED/CONDITIONS
I BARRIER ON EAST FIREPLACE RIGHT SIDE.
Action: AP APPROVED
: DN DENIED
MECH
REPTl31 Run Id: 6154
+:27 om vait co'- ciiy 6i -
Requested lnsp.ect Date: fri.day, December'15, 2006
Insoection Area: SH
Site Addrss: 1401 LIONS RIDGE LP VAIL
1401 LIONSRIDGE LOOP
A/P/D Informatlon
Tvoe: B-ELEC SubTvoe: ASFR Status: ISSUEDOccup_ahby: O'se: Insp Area: SH
& JANE Y.'
Phone: 970-390-1173Phone: 970-390-1173
OR REWORK ABOUT 80% OF ELECTRICAL
Requested Tlme: 11 :30 AM' Phone: 970-390-1173
Entered By: DGOLDEN K
Reouested Inspection(s)
Insoectlon History
Item: 1 10 ELEC-ServiceItem: 120 ELEC-Rouoh
0st22t06 |
Comment: (
Item: 130 ELEC-ConduitItem: 140 ELEC-Misc.Item: 190 ELEC-Final
Time Exp:
-\-\.-f rJ-*-- |
? 7 ;-(zoLl
&,/rno/o fi2yru{ra4
DITIONS
BE AIR TIGHT RATED OR
Item: 190 ELEGFlnal
Reeuestor: DANICI ELECTRIC
Assisned To: "rolh fZ
Run Id: 6L28
1110-2006 Inspectio.l RequFqt Reporting page 3+
Request€d Inspect Date: Thursday, December 21, 2006' Inspection Area: CG
Slte Address: 1401 LIONS RIDGE LP VAIL
1401 LIONSRIDGE LOOP
A/P/D Information
Reouested Inspection(s)
Item: 390 MECH.Flnal
B-MECH Sub TgOe: ASFR Status: ISSUED
lnso Area: CG
Phone: (970)328-2699
Phone: (970) 328-2699
REOUIRED
Requestor:
Coniments:
Assiqned To:- Action:
Comment:
Requested Time: 11:00 AM- Phone:
Entered By: JMONDRAGON K
lnspection Historv
Item: 200 MECH-Rowh * Aooroved *
0Sn1t06 Inspector: SHAHN Action: APAPPROVEDcommenL l[sf_E_cJED; F_O-!L_EB DV, LOWERBAIH,I(LCIrEN VEN_T]D-U^CT ROUND DUCT TNSTALLED,
UPPER BATH TO REMAIN UNCHANGED DUE TO ASBESTOS.
5t, tt Yxl'z--Q"'
5-d^^ \^-A- "l'+b *'-V''*
* ADDroved *
JRM " Action: APAPPROVED
HEAT APPROVED l OO # AIR TEST
Item: 310
Item:315Item: 390
REPTI-31 Run Id: 6154
12-20-2006 Inspection Request Reporting Page 41
+:23 om vait_ co'- cify ol -
Requested Insp€ct Date: I[ursday, December 21, 2006
Inspeition Area: CG
Site Address: 1401 LIONS RIDGE LP VAIL
1401 LIONSRIDGE LOOP
A/P/D Informatlon
^ Type: B-PLMB
uccuoancv:
t JANE Y.'
BATH
SubTgne: ASFR
Phone: 970-39G1138
Phone: 970-390-1138
Requestod Insoection{B)
Item: 290 PLMB-Final
Reouestor:
Coniments: WILL CALL 914-5045
Assioned To: JMONDMGON <1- Action: 1) a,,9q- *-- Time Exo: ) ?
Comment: APPRQVEIIKIICHEN AND 1 BATH GRFONIY (TCO)
+"-v r ,.!
Comment:
09/26/06
Item:
Item:
230 PL
240 PL * Approved **
shahn "
E ON 5# AIR TEST.
Action: AP APPROVED
Item: 290
Ldr-n-) Y./- fr<,u)
Lov-or 'D
Inspectlon Hlstorv
Item: 210 PLMB-Underoround
08/09/06'lnsoector: JRM
CommentItem: 220 PLMB-Rouqh/D.W.V.MB-Rouoh/D.W.V.
09/21l05 lnsoect,
Commenl HARD PIPE ON 5# AIR TEST.
PLMB-Final
12119106 Inspector: JRM Action: PA PARTIAL APPROVALComment APPROVED KITCHEN AND 1 BATH GRP ONLY (TCO)
Requested Time: 1l:30 AM
Entered By: JMONDMGON K
Status: ISSUED
Insp Area: CG
REPT131 Run Id! 5154
Prcject ltlame: Hart residence
Project Deecription:
Perticipants:
VAIL CO
81657
License:
prciect Addtcss, t#t?lorc RIDGE tp vAIL-.\
lrOal Deccrlption: lot: a Bbck{subdlvblon: UON'S RIDGE FIL. 2
Psrccl Number: 210312202006
Comments:
Repaint, replace siding and deck rails - same for same,
Design Review Board
ACTION FORM
Departnent of Community Devdopment
75 South frontage Road, VaiL C-olorado 81657
tef : 970.479.2139 fax: 970.479.2452
web: www,ci.vail.co.us
DRB Number: DR8010258
location:
APPLICANT HARI RICHARD H. & JANE Y, 08/20/2001 Phone: 328-6373x20
1401 LIONS RIDGE LOOP
VAIL CO
81657
License:
OWNER HART, RICHARD H. &JANEY. 08/20/2001 Phone:
1.101 UONS RIDGE LOOP
Motlon By:
Second By:
Vote:
Gonditions:
BOARD/STAFF ACTIOT{
ACtiON! STAFFAPR
Date of Approval: 08/20/2001
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail staff and/or the appropriate rwiew committee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: CONffi04956
That the railings be a minimum of 36" tall and the picket spacing be no more than 4'
Planner: Judy Rodriguez DRB Fee Paid: 320.00
mwm
General Information:
Application for Design Review
Departrnent of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.48.2L39 fax: 970.479.2452
web: wurw.ci.vail.co.16
This. application. b -fur any project requirirq Design Review apptoval. Any project requiring design re\riew mustreceive apprcval prior b submitting a builcling p,ermit application. please refui m ine suohittal requirements for theparticular approval that is requested. An application'for Design Reriew cannot be accepted until all requiredinformation is rec€ived by the_Community Derelopment Department. The project may also need b be rwiewid bythe Town council and/or the Planning and Environnental dommission. olsiln neview Board approvat lapsesunless a building permit is issued and construction commencelr within one year of the approval.
ptionoftheReque-st H"*" P.,IL ( {rt t,.,t).
PhysicalAdd
Location of the Propcal:Lot: ? Btock:
Lness:
9tt (Contact Eagle Co. Assessor at 970-328-8540 for parcel no.)
Owner(s) Signature(s):
Name of Applicant:
Mailing Address:
>7 9y
2O
Name(s) of Orner(s):
Mailing Address:
Type of Review and Fee:
E New Constructiontr Addition
\ Minor Alteration
tr Changes to Approved Plans $20
$200
$s0
$20
Phone: {8E
For corEfuqtion of a new building or derno/rcbuild.
For an addition where square botage is added b any residential or
commercial building (irrludes 250 additions & interior conversiors).
For minor changes to buildings and . site improvements, such as,
remofing, painting, window additiohs, landscaping, fences and
retaining walls, etc.
For revisions to phns already apprwed by Planning Staff or the
Design Review Eoard
PLEASE SUBMITTHIS APPUCATION, ALL SUBMmAL REQTJTREMENTS
AND THE FEE TO THE DEPARTMENT OF COMMUNITY DEVELOPMENT.
75 SOUTH FRONTAGE ROAD, VAIL, COLOMDO 81657.
T0l,fNffi
Questions? Call the Planning Staff at 479-2138
MINOR EXTERIOR ALTERATIONS
TO BUILDINGS AND SITE IMPROVEMENTS
SUBMITTAL REQUIREMENTS
General Information:
This application is required for proposals involving minor exterior alterations and/or site improvements.
Proposals to add landscaping do not require DRB approval unless they involve the addition of patios, water
features, grading, or the addition of retaining walls.
I. SUBMITTAL REOUIREMENTS
o Stamped topographic survey*, if applicableo Photos or plans which clearly convey existing conditions*n Photos or plans which clearly convey the proposed building or site alteration(s)*o All relevant specifications for,the proposal including colors and materials to be used.D Lighting Plan* and Cut-sheet(s) for proposed fixtures, if applicabletr Written approval from a condominium association or joint owner, if applicabfea The Administrator and/or DRB may require the submission of additional plans. drawinqs.
specifications. samoles and other materials (including a model) if deemed necessary !o determine
whether a project will comply with Design Guidelines or if the intent of the proposal is not clearly
indicated.
Please submit three (3) copies of the materials noted with an asterisk (*).
II. REPAINT PROPOSALS
For all proposals to repaint existing buildings, the following supplemental information is required:
I Color chip or color sample including the manufucturer name and color number(s)o Architectural elevation drawings which clearly indicate the location of proposed colors (ie.
siding, stucco, window trim, doors, fascia, soffits, etc,) The following is an example:
o
Buildino Materials
LIST OF PROPOSED MATERIAU'
Tvoe of Material Color
Roof
Siding
Other Wall Materials
Fascia
Soffits
Wndows
WindowTrim
Doors
DoorTrim
Hand or Deck Rails
Flues
Flashing
Chimneys
Trash Enclosures
Greenhouses
Refdining Walls
Exterior Lighting
Other
Notes:
Please speciff the manufacturer's color and number and attach a color chip.
All exterior lighting must meet the Town's regulations regarding lighting (see Tltle 14 - Development
Standards). If exterior lighting is proposed, please indicate the number offixtures and locations on a
separate lighting plan. Identiff each fixture type and provide the height above grade, lumens output,
luminous area, and attach a cutsheet ofthe light fixtures.
I
PROPOSED I.ANDSCAPIN
Botanical Name Common Name OuantiW Size
PROPOSED TREES
AND SHRUBS
EfiSTING TREES
TO BE REMOVED
Minimum Requirements for Landscaping: Deciduous Trees - 2" Caliper
Coniferous Trees - 6' in height
Shrubs - 5 Gal.
Tvpe Souare Foolaoe
GROUND COVER
soD
SEED
IRRIGATION
TYPE OF EROSION CONTROL
Please speciff other landscape features (i.e. retaining walls, fences, swimrning pools, etc.)
o
UTIUTY LOCATION VERIFICATION
This form is to veriry Service availability and location for new construction and should be used in
conjunction with preparing your utility plan and scheduling installations. The location and availability of
utilities, whether they are main trunk lines or proposed lines, must be approved and verified by the '
following utilities for the accompanying site plan.
Authorized Sionature Date
QWEST
970.384.0238 (Et)
97038a.0257 (fax)
Contact: Jason Sharp
PUBUC SERVICE HIGH PRESSURE GAS
970.458.2s28 (tel)
Contact: Bruce Miller
HOLY CROSS ELECTRIC ASSOC.
970.949,s892 (tel)
970.949.a566 (fax)
Contact: Ted Huslcf
EXCEL ENERGY
303.571.7518 (tel)
343.57I.7877 (tax)
Contact: Paul Kellogg
EAGLE RIVER WATER & SANIIATION
DISTRICT*
970.476.7480 (tel)
970.476.4089 (fax)
Contact: Fred Haslee
AT&T BROADBAND
970.949.1224 x 112 (tel)
970.949.9138 (fax)
Contact: Floyd Salazar
*Please provide a site plan, floor plan, and elevations when obtaining approval from the Eagle River Water
& Sanitation Dlskict. Fire flow needs must be addressed.
NOTES:
1. If the utility verification form has signatures from each of the utility companies, and no comments
are made directly on the form, the Town will presume that there are no problems and the
development can proceed.
2. lf a utility company has concerns with the proposed construction, the utility representative shall
note directly on the utility verification form that there is a problem which needs to be resolved.
The issue should then be detailed in an attached letter to the Town of Vail. However, please keep
in mind that it is the responsibility of the utility company and the applicant to resolve identified. problems.
3. These verificaUons do not relieve the contractor of the responsibili$ to obtain a Public Way Permit
from the Department of Public Works at the Town of Vail. Utlitv locations must be obtained before
digoing in any public right-of-way or easement within the Town of Vail. A buildino permit is not a
Public Wav oermit and must be obbined seoantely,
NOTES TOALLAPPUCAI{Ts
Pre-aoolication Meetinq
A pre-application meeting with Town of Vail staff is encouraged. The purpose of a pre-application
meeting. is to identifr any critical issues perhining to the applicant's proposal and to determine the
appropriate development review process for an application. In many casesr the pre-applicagon meeting
helps to o<pedite the development review process as critical issues are identified and dealt with in th6preliminary stages, A pre-application meeting may be scheduled by contacting Judy Rodriguez at
97 0.479.2128 or irodriouez@ci.vail.cQ. us
Time Reouirements
The Design Review Board meeb on the lst and 3rd Wednesdap of each month. A complete application
form and all accompanying material must be accepted by the Community Development departmint prior
to application deadlines. A schedule of DRB meetings and associated application deadlines may be found
on the World Wide Web at http://ci.vail.co--us/cqmfndevlolanning/d.r!/imeetinosld.gfau_lt.htm For a new
residential development the application deadline is Wpically 3.5 weela prior to a Design Review Board
hearing.
Review Criteria
The proposal will be reviewed for compliance with the Design Guidelines as set forth in Title 12, Chapter
11 (DesiSn Review) and Title 14 (Development Standards) of the Municipal Code.
Reouirements for orooerties located in hazard areas
If a property is located in or adjacent to a mapped hazard area (i.e. snow avalanche, rocKall, debris flow,
floodplain, wetland, poor soils, etc.), the Community Development Department may require a sits€pecific
geological investigation. If a site-specific Aeological investigation determines that the subject property is
located in a geologically sensiUve area, the property owner(s) must sign an affidavit recognizing the
hazard report prior to the issuance of a building permit. Applicanb are strongly encouraged to consult
with Community Development staff prior to submitting a DRB application to determine the relationship of
the property to all mapped hazards.
Reouired Plan Sheet Format
For all surveys, site plans, landscape plans and other site improvement plans, all of the following must be
shown.
1. Plan sheet size must be 24'l 36". For large projects, larger plan size may be allowed.2. Scale. The minimurn scale is 1"=20'. All ptans rnust be at the same scale.3. Graphic bar scale.4. North arrow.
5. Title block, project name, project address and legal decription.6. Indication of plan preparer, address and phone number,7. Dates of original plan preparation and all revision dates.L Vicinity map or location map at a scale of 1"=1,000' or larger.9. Sheet labels and numbers.
10. A border with a minimum left side margin of 1.5",
11, Names ofall adjacent roadways.
12. Plan legend.
o
Desion Review Board Meetins Reauirefients
For new construction and additions, the applicant must stake and tape the project site to indicateproqeB lines, pmposed buildings and building corners, All trees to be removed must be taped. Th;
applicant must ensure that staking done during the winter is not buried by snow. All site tapings andstaking must be completed prior to the day of the DRB meeUng.
Applicants who fail b appear before the Design Review Board on their scheduled meeung date and who
have not asked in advance that discussion on their item be postponed, will have their items remored
from the DRB agenda until such time as the item has been republished.
lf the DRB approves the application with condiUons or modificationt all condiuons of approval must be
resolved prior to the issuance of a building permit.
Staff Aooroval
The Administrator (a member of the planning staff) may rs,riew and approve Design Review applicaUons,
approve with ceftain modifications, deny the application, or refer the application to the Design Re/iew
Board for a decision, All staff approvals are reviewed by the Design Rsriew Board and any staff decision
is subject to final approval by the DRB.
Additional Review and Fees
If this application requires a separate review by any local, sbte or Federal agency other than the Town of
Vail, the application fee shall be increased by $200.00. Examples of such review, may include, but are'not limited to: Colorado Department of Highway Access Permits, Army Corps of Engineerc 404, etc.
The applicant shall be responsible for paying any publishing fees in excess of 50o/o of the application fee,
ff, at the applicant's request, any matter is postponed for hearing, causing the matter to be re-published,
ften the entire fee for such re-publication shall be paid by the applicant.
Applications deemed by the Community Development Department to have design, land use or other
issues, which may have a significant impact on the community, may require review by extemal
consultants in addition to Town staff. Should a detennination be made by Town staff that an external
consultant is needed, the Community Development Department may hire the consultant. The
Department shall estimate the amount of money necessary to pay the consultant and this amount shall
be forwarded to the Town by the applicant at the time of filing an application. The applicant shall pay
expenses incurred by the Town in e<cess of the amount forwarded by the application to the Town within
30 days of notification by the Town. Any o<cess funds will be returned to the applicant upon review
completion.
T(}l{,H
I, (print name)_
IOINT PROPERTY OWNER
WRITTEN APPROVAL LETTER
a
a joint owner of property located at (address/legal
description)
provide this letter as written approval of the plans dated
been submitted to the Town of Vail Community Development Department for the proposed improvements
to be completed at the address noted above. I understand that the proposed improvements include:
I futher understand that minor modifications may be made to the plans over the course of the review
process to ensure compliance with the Town's applicible codes and regulations.
(Signature)(Date)
which have
?o
€.rt )-".--
tr*) ltt
DecL
x3/r'
Izt" (
r
Door
DF^\
r^*4t 'T 0"nI ,;. I
N"t^ aP^t"
I a*^c.L r
N.- D*n ;ll L,.,*
g(.rdlt.., /"", 5l.tt
9cet,.rcc0 4?%'rr^ fivtJti
fc.**- r.,r-/.:rr,.o-L, ;. n, LL
t aa-*n^ 'Caryaa,t^
To N>Rru €ft1*.
rl
|*ous 17
ft,,.". -l* wu} q^"^ bl^,:t crrr
o(C {f ee,,t
I I
l-
rn LL' \+5 f^0p^[uezSti,n *T n*ry
frv'*,oo'Qfuw z,- Ad- WL^fuf,oe-s*^,
3b, y ,f"F,eJrre- r nto q-z&'-ftLI-L \rVa.,-A
'|*'l' f +*+**tt+*'1.'1.ri**rt:1.+rt{r+*++*'t********'*'}**t:t*,t ** +t{.i ***:t **:***,*t {.!r**,},} ++,t**++ ++++ +++++ ++**i****
TOWNOFVATL, COLORADO SIStEglflt****'*'i'****t*+**+++*'!***'t'i***,t *'f,!t*+********+,r*+**+*+****+***'i{r*+*******'}*****:t*'t*rt *,},****,***:***
statement Nuniber: R000001252 Amount: g20.oo as/2o/2oo]:-o:59 AM
Payment l,lethod: Check Init : JAR
Notation: 6421
PermiC No: DRB01OZ6B Type: DRB - t4inor Alteration
Pareel No: 2L03122OZOO6
Site Addreee: 1-7 43 IJIONS RfDGE Lp VAIIr
L,ocatlon :
Total Fees: $20.00Thio Payment: $20.00 Total ALL, pmtE: $20.00
Bal"ance: $0.00
+ +***,1.:i'lt* ++ + + * **** ** +'t* r.+*'t * *
'rr
*r*** * '*{r * +*.* + +** **** +**** ** * **** ** * *!**r}* * **,t ** {r'}r},}* ***** **** *,*,*
ACCOIJNT ITEM LIST:
Account Code Oescription Current pmts
DR O()1()OOO31i22OO DESIGN REVIEW FEES 20. 00
I a)
Design Review Action Form
TOWN OF VAIL
hoject Name: Hart Residence
Project Description: Addition of parking space
Owner, Address and Phone: Richard Hart, 1401 Lions Ridge Loop, Vailn CO 81657
Architect/Contact, Address and Phone:
Project Street Address: 1401 Lions Ridge Loop
Legal Description: Lot 4, Lions Ridge #2
Parcel Number:
Comments: Project#:
BuildingName:
Motion by:
Seconded by:
Vote:
Conditions:
Town Planner: Brent Wilson
Date: 8/30199
FTEVERYONE\DRB\APPROVAIggVIART.WPD
Board / Staff Action
Action: Staff Approved
DRB Fee Pre-Paid: nla
t6Yis.a 8/17 /94
DESIGN REVIEW BOARD APPIJICAUON ' TOI|N OF VAIIT, COLORADO
DATE RECETVED:
DATE OF DRB MEETING:**********
INCOMPL'ETB APPLICATIONS MAv NOr BE SCEEDUII,ED FOR REVIEW.
I.
A.
**********
FROJECT INFORUAITION:
DESCRIPTION:
B.TYPE OF REVIEW:
New ConsbrucLion ($200.00)
Addition ($50.00)
Minor Alteration ($20.00)
ConcepLual Review ($0)
ADDRESS, l4 0 t Llont{tr>ce (ao(
I,EGAI,, DESCRIPTION: IJOT Block
Subdivision Lto G*
D.
E.
F.
H.
I.
J.
If properby is described bydescription, please provideto this application.
a meets and bounds
on a separat,e sheet
lega1
and atlach
ZONING:
NAI\4E OF
Mailinq
APPLICANT:
Address:
Phone
NAME OFuailing APPLI,CANT I S REPRESENTAT
Address:
OWNER(S) SIGNATTIRE:
\ t/ ,c-vw<-uloilz- *k^fMailing Address:
Phone
APPLI,CATTONS WIIJIJ NOT BE PROCESSED WITHOTE O'{NEN ' S STGIiIAr(TNE
Condominium Approval if applicable.
DRB FEE: DRB fees, as shown above, are to be paid at the
time of submittal of the oRn application. taEer, when
applying for a building permit, please identify the accuratevaluaLion of Lhe proposal . The Town of Vail will adjusL thefee according to the t.able below, to ensure the correct feeis paid.
fEE PAID: $CHECK #: DATE:. BY:
NAME OF OWNER(S):
FEE SCHEDULE:
VAIJUATION
$ 0 $ 10,000
,i.'!.\.,\.iD fU. UUJ. . iD JU, UUU
$50,001 -$ 150,000
91s0,001 - $ soo,000
$500,001 - $1.000.000$ Over $1,000,000
DESIGN REVIEIT BOARD APPROVAIJ E:IIPIRES
APPROVAIJ UNIJESS A BUIITDING PERIIfT IS
IS STARTED.
FEE
$ 20.00
$ 50.00
$100. 00
$200. 00
$400.00
$500.00
ONE YE,M AFTER FINAT
ISSUED ATID CONSTRUCTION
(Jl;,rtu {tP*
Richard H. Hart
1401 Lion's Ridge Loop
Vail , colorado S165?
Septenber 22, 1995
Solar Crest Assosiation
14OO Lions Ridge IoopVail, Colorado 8L657
Ladies and Gentlemen:
Re: Lions Ridge Loop cul-de-sac
I thcught it would be useful for ne to state invriting the history of ny position about the cul-de-sac atthe east end of our property, Lot 4 Lions RidgeSubdivision, Filing No, 2. f bel-ieve Jane concurs.
For years we have been concerned at the unsightly
appearance of the cul-de-sac, its random unauthorized usefor vehicle parking and the trash and apparently innobilevehicles that from time to time accumulate. We trave overthe years expressed those concerns to neighbors including
oqtners at Solar Crest and pat Dauphanais. At our reguestin past years Pat placed rocks in the eul-de-sac to blockits use for long periods. At our request they have largely
been removed.
f'or years we have extrrressed a uillingness to discuss
use of that property for parking by Solar Crest owners ifit could be done in an aesthetic nay. No proposal has ever
been suggested.
I'rom our point of view the most aesthetic use of theproperty is its restoratLon to natural contours,
acknouledging the road. This must be obvious.
With this background, on or about September 9 Mike
Letourneau inforned ne that Pat was dunping fill on thecul-de-sac. I had not seen this. I told hin that Pat had
no specific authority to do that, that we were willing todiscuss whatever Solar Crest wished to present but I didnot offer to stop Pat.
Over the next day or so Pat continued fill sork and I
repeated to Uike our willingness to listen.
On Septenber l.B the president of the associationcalled. She asked if I would be willing to talk tocoumunity developnent peopte about the issue. t said thatwould be fine.
No contact rras made from the town to me on Septenber19 and as the day wore on it hj_t me that she must haveexpected ne to call conmunity development to put a haLt toPat's nork. That had not been what I originally thoughtshe wanted and expected me to do, so I began to sketch outthie letter.
Also, on Septenber 19 pat told me that the townreported that the Harts objected to his fiII work. Heasked us to sign an application reflecting our consent.Jane did so.
My position remains the same as it has been ever sincethe issue was first presented. ff Solar Crest wishessomething of us I will listen.
Pat has, however, somevhat taken the bit in his teeth.He is doing fill, regrading and reseeding operations whichfrankly please us. It makes no sense for us to ask pat tostop something of which we approve to await a neverforthcoming proposal . practically, his work probably nakesit Less likeLy for me to respond favorably to any proposalfor parking on our property which Solar ciest mayeventually make.
Sincerelv.
&puw
Richard H. Hartcc: Mike Letourneau
Pat Dauphanais
l
\b W
H\l
c8d!F
s o'
s
\
ffi
3E
=trlqF(toq\E
Riil:
o*h.TJ["
Wr'nyt
l40f .,:
175
l4
t607
Go?o
3ot
o
oo
3
3ct
/
ooza{Eco{6z.F
FT
{
t
t
a=
-:
J
@m-n
t-Tm
{
rm{ma-
!;
1
6g,
z
1llo"ll
1'mI
-t
trtrtr
BIEIg
EE" Ifi
l=trnE
'Tt !or
z=
22!o
z
aP-{m
l*
IF
lffi o'n
!m!
={
-.{o
E
mxml,{
oz
Lo
@9-{m
e(ptse
0?ts
7
2^
Ei
-t
8=
='d*;62.
Y>
\J -o
z. a-
3=
1Z(Jc)7
-d?
!e6n-{oo>iD t-
o
zAlmvz>mC)n-t>o|-I
a
T
=m
-l
o
=zm
-l
(I'z
=IT
p
a)
9,T
a,-tf+
oo-
r+
o
=
z-3Bc)>
t-o{
ls
I
I
@t-
r
I
I
F
=c,
F-
o
rd
IBI'ls
I
I
I
I
I
{mt-m
tito
l€
lz
let<t>
IF
n {
€z
.tl
Pt-!mo
zo
'n
3
Hlo
l€F
lo
l-rlt<t>
||-t-
tm
lo
lz
lo
L
-n l{to
t=z
o'n
t>
Fl!
lmp
..1
mt-
|TI
t-lto
t=z
oI
F
m
ozro
_n
roE
-
.A
c)io
U'cf5c
ct
o
l =
m
o
=
Br
F
z
m
Es$g$
fi 3;fr3
Ei:B+
':=:-E 3I=308do * 'tt
o
fc693
PA 3€=
€E*iH
gFSE;
tr?i iF
#aai
#Esl
se;g*
Eaae a
3 5 B
=.
j
IFfi *q
B;1i€6'9FE
{
Tm
o.tI
t-
€oo
mt-m
-m
>|
T5PH 5g
6
za
t-
-{6z
z-ooc,om95t'rrc)5;filF1fi'EPr 3 6n17 z^3a
| | I Hltrttlcoo>EPBEE6gi
! E.:*=az -{trtrtttl
zm€
l--{
lTlu{
d2
:
z
x
m
:
-.{
m
o
P
C'o
I.ll
-{
r-
t
dz
N:R1iifEci>nzoc)O-<z
O 1tl
"8E= =ba-l6ozz
Nm=
si_ <-Pe
mzt4l
i>
i'o.tm
1Oi!aioz.
JOD'na{r.O)-nDx
DI
t(,^)
-l
m
-l;
^zm
tt
t-
m
zzo
F
F
zaz
-1m(A
BI
EIz
at, I.-t ,n>tdl'l
I
I
I
I
El-l
I
!r
=6
c
1
e)-
it^
,F|
N
-to-{
-1lrfln
.={'nmmq,
6m{
x
t-I'l
z
m
+
0m2o2Tm
=m
=
rtl
g
a
z.t!
f,
=mo
2
f)
t-
t-
=q
z
mT'm
=
r
zo
m
x
tD
F
z
m
3
1'mv
={.Tl
nIrnU'
VALUATION
!
lTlFIq
zo
m
z
r
3a-
=ez
mt-fic)
I
c)
t-
@
F
zo
(JJ
Nsr..o
F
O@O
t\)
@(o
(^)
(tr
9!)F(
I
I
$
I
I
I
(tl
(J|
N)(Jl
oo
O(f
o
(JtO
O
roO
o
+o
oo
(t Cr)
O)
oO
Hs5
(JrO
f\)@(o
()o
uLF, lq/0'/
b lnl(a il ,r7
csi'j
i
U
ST'$lUC I !C['{ PEi:li;i I'l'
-t ,<) -t +-/' \ -i ,/ -/ <J -u2 :. --"'
.. ti:;: : : :;.i.: ;r'. o i ccmi';u;r! iy d e'.,elopmeilt
TO 8E FiLLEC CUT CO:,1Pi-ETELY PRIORTO ISSUANCEOF PERMIT
TYPE OF PER[1IT
! eutoincff Etaclnrc,rL
:.i'r!cl-lAr,lrcAL
PLUI,4 BING
FOUNDATION
c,r,r l/A ,' I Co la ea.47t-35o1
T'\..'N C.F VAIL FEG. NO.-3e
;or..'N cF \/Au- R3G. NO.
-l
Tn
/1:,/tl=o
G 5:.,i!RAl
Lv.r l i( A!, 1\,i\
\1!CiJAiI iCAL
vr-.inr\Llvi\
cn
ta(
LU
..i
I
:C,..'N OF VAIL HEG. NO,
TC1'/N OF VAIL PEC. NO,
l.,t E /-t,f r;
Trl "N Ci VAIL REG NO.
L L: \ t l{t1!. I Lr\:r*rr.;..*
NOTE
DATE
- COPY OF PE']MIT TO gE KEPT ON JOBSITE
0010i5
4,1I.TYPE OFCONSTIIUCTION . I II III I\
2.OCCUPANCYGROUP ABEHI
otvtstoN , , ,$o
GENERAL DESCRIPTION OF WORK :
-
A@,"F.gAl t> R \tt$:L+f
PERr"rtr NO.
I rrrn-Dr;;r: | ),'1 '/ I ', a t
z
F
5)
ELECTIIICI.L
PLUI..I BIN G t-l ..t9p,aF
fr'IECHANICAL j z +7, oz,
GROUP SO. FT. V^LUATION PERI,lIT FELP3EUlLOn rC P E Rt,{ iT t vToa
PLAN CHECK / {1.52
36, eo
i'lE\\' ( ) ALTERATION( ) AO0lTlOi.lr\L (() REPAIfr( )
OWELLING UNITS
-
ACCOI,IINODATION UNITS-
G.R.F.A. 649.-eEonooi,,rs
CO I./tIVIERC|AL SYST
-COVEREO
PARKINC
HEIGHT IN FT.
-
UNCOVEREO PARKINC
-
NO FTREPTACES
PL U I,l BING s:o, aa
MtcHAr.lrcAL Ao. eo
nccnEATrcH r* J6 7e-e
l') E srG I,i n EviE"t e0AR0 5-O. ed
CLEAN.UP OEFOgIT /eo-eo
USE TAX s57. oo
INSULATION
TOTAL PERI,,IIT FEES /asg . fo
FLOOR
EXT. WATLS
ROOF
IITE THICKNESS R.VALUE
ilunoTicFo?FrcrAL-- - - 6,tlE
: - 4.*.-q=- v4+-</zlgi - -i,olrfNc Aor,l nlsTRAToR - dATf
HEAT
{
IZON|NG & BUILOING NOTES:
-
I
ELEC: I GAS:
i
I
I
99$1:--- -- -* *--L.Y99-o;
rl
I
f hereby acknorvledge that lhave read this application, filled out in full the informatian requitea,
completcd an accurate plot plan. anC state that all the intor,'nation pro,tided es requitel ;,. cutect. I
aErce to comply vrith the information and plot plan, to contpl,/', itfi all'Tcwn ord:nenc?i er.C 3t,-,.?
lavrs. and to build this structure according to the Toy/n's zoning and subdivision co4e., a?ti?n
review approved, Uniform Building Code and ofhor ordinances of the Town applicable thetEic.
t: fl,
STGNATURE qF OylNEB OR CONT8ACTOi ?O? htr/,iz-F J
ANO THE OYINEA.
INSPEQIION:
*
JOB NAME
MON
CALLER
TUES THUR
:i'
READY FOR
LOCATION:
,l
t"': ''
ftt''i' t
DATE
'l';
;t
WED
INSPECTION REQUEST
TOWN VAIL
BUILDING:PLUMBING:
tr UNDERGROUND
tr ROUGH i D,W,V.
tr ROUGH / WATER
tr FOOTINGS / STEEL
tr FOUNDAT
tr FRAMING
ION / STEEL
n ROOF & SHEER- PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL tr
tr
ELECTRICAL:
tr TEMP. POWER
MECHANIGAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
n_
tr FINAL tr FINAL
tr APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
t
DATE INSPECTOR
,;.
REQUESTVAIL .^ 'CTION
TOWN OF
JOB NAME
BUILDING:
tr FOOTINGS / STEEL
PLUItIBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH/WATER
n ROOF & SHEER- PLYWOOD NAILING tr GAS PIPING
tr INSULATION
tr SHEETROCK
tr POOL/ H. TUB
NAIL u
tr
tr
tr
tr FINAL FINAL
ELEGTRICAL:
tr TEMP. POWER
ITIECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr FINAL tr FINAL
ffheenoveo
Z. CORRECTIONS:
tr DISAPPROVED T] REINSPECTION REOUIRED
INSPECTOR
rNsilcrroN REouEsr-iOWfrt OF VAIL 'ii"r* \'r'
DATE JOB NAME
.rr'..
READY FOR
LOCATION:
INSPECTION:
CALLER
TUES rHufi
,' .a .,, .
MON WED FRI PM
BUILDING:
tr FOOTINGS / STEEL
PLUItIBING:
q UNDERGROUND
tr FOUNDATION / STEEL
tr FBAMING
r-r ROOF & SHEER- PLYWOOD NAILING tr
tr
tr
n
GAS PIPING
tr INSULATION
tr SHEETROCK
D-
POOL / H. TUB
NAIL
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
ITIECHANIGAL:
tr HEATING
tr ROUGH r] EXHAUST HOODS
tr
tr
CONDUIT tr
n
SUPPLY AIR
,,.ftr FIMAL tr FINAL
/APPROVED tr DISAPPROVED T] REINSPECTION REQUIRED
CORRECTIONS:
DATE /INSPECTOR
'.7- 7-1,:: -.---4*--
-
DATE JOB NAME
rNsilctoN
TOWN OF
neouE$T "
vAlL *4rt .+
INSPECTION:
CALLER
MON TUES WED
..-.
THUR}FRI AM.. PMREADY FOR
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
tr FOUNDATION / STEEL
tr FRAMING
r-r ROOF & SHEER" PLYWOOD NAILING
tr INSULATION
-
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER
tr GAS PIPING
tr POOL/ H. TUB
trSH
E
tr FINAL
ELECTRIGAL:
tr TEMP. POWER
ITIEGHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
trtr
tr FINAL tr FINAL
,{.li,tr FINAL
" EI APPROVED
CORRECTIONS:
B DISAPPROVED tr REINSPECTION REOUIRED
INgPECTOR
tltatinltY/t.ll
IN
itl) ,
CTIONTOWN OF
i"
REOUEST "
vAlL '. ,*. .'s
DATE
READY FOR
LOCATION:
INSPECTION:
JOB NAME
-nno)+")
CALLER
TUES W,ED THUR FRI
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
.F ROUGH / D.W.V.tr FOUNDATION / STEEL
ROOF & SHEER
PLYWOOD NAILING
V ROUGH / WATER
,'/ \
tr GAS PIPING
POOL / H. TUB
FINAL
tr HEATING
., tr EXHAUST HOODS
Xsuppr-v nrn
tr DISAPPROVED T] REINSPECTION ;ourREp
CORRECTIONS:
D^rE (./" F,/)* <tl ""- rNspEcroR
*
gJ^fplt REouHqr
DATE
READY FOR
LOCATION:
INSPECTION:
JOB NAME
MON
CALLER
TUES WED THUR AM
tf. ,' l.r, 'Q)
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH/WATER
n ROOF & SHEER", PLYWOOD NAILING tr GAS PIPING
INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL tr
trtr
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
T] FINAI.tr FINAL
i+fr*PRovED," CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
,
:
DATE i? - /.'.'- j
INSPECTOR
CTION
TOWN OF
t-
REOUEST
VAIL
JOB NAME
MON
CALLEB v_.
AM I PM .,.READY FOR INSPECTION:
LOCATION:
'"t"'- \,,.T_l-l_UR"'
tr FOUNDATION / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER
r-1 ROOF & SHEER" PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL
tr HEATING
tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
OVED
' COBRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE
_clfpN- nFouHs.[TOWN OF VAIL!
DATE
READY FOR INSPECTION:
LOGATION:
JOB NAME
MON
CALLER
TUES THUR FRI/,_ ar--_ ' ^_".- . :
PMAM
BUILDING:
FOOTINGS / STEEL
FOUNDATION / STEEL
FRAMING
ROOF & SHEER
PLYWOOD NAILING
INSULATION
SHEETROCK NAIL
-
tr
-tr
tr
tr
tr
tr
tr
tr
tr
PLUIIBING:
tr UNDERGROUND
tr BOUGH / D.W.V.
tr ROUGH/WATER
tr GAS
tr POOL
PIPING
/ H. TUB
tr FINAL tr FINAL
ELEGTRICAL:
tr TEMP. POWER
F ROUGH
tr CONDUIT
MECHANIGAL:
tr HEATING
tr EXHAUST HOODS
tr SUPPLY AIR
tr FINAL FINAL
tr
tr
tr
V Rppnoveo
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
,./
[
"^*INSPECTOR
liatl rt/vall
.f
,rlf.--!
G,I
INSPECTION REQUEIIT*
DATE
READY FOR
LOCATION:
INSPECTION:
JOB NAME
MON
, (_.-
CALLER
tucs:WED THUR
.) \, I
FRI AM t,g-:,
/ , a (-,
BUILDING:
N FOOTINGS / STEEL.
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
rr ROOF & SHEER" PLYWOOD NAILING O GAS PIPING
tr INSULATION POOL / H. TUB
tr SHEETROCK NAIL
E FINAL
ELEGTRICAL:
tr TEMP. POWER
MECHANICAL:
N HEATING
D ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIB
tr DISAPPROVED tr BEINSPECTION REQUIRED
CORRECTIONS:
INSPECTOR
I
}.
DATE .T . JoB NAME
INSPECTION:MON
I
rn#gg*o5, $F.ouhsT'
READY FOR
LOCATION:
WED THUR FRI AM PM
BUILDING:
F FOOTTNGS / STEEL
PLUMBING:
tr UNDEBGROUND
tr BOUGH / D.W.V.
tr ROUGH/WATER
tr FOUNDATION / STEEL
tr FRAMING
n ROOF & SHEER- PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL tr
utr
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
tr tr FINAL
APPROVED B DISAPPROVED tr REINSPECTION REQUIRED
,,2 CORRECTIONS:
DATE .,t- v - ; t.--
BUILDING:
tr FOOTINGS / STEEL
PLUItIBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr BOUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
r-r BOOF & SHEER" PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL tr
tr u
tr FINAL T] FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr
tr FINAL
tr
tr FINAL
tr APPROVED
CORRECTIONS:
tr DISAPPROVED , E}fEINSPECTION REQUIRED
INSPECTOR .DATE 7- z- ,i''---
.|
.1.
'l
TOWN OF
tREQUE TvAlL If
"
DATE
READY FOR
LOCATION:
JOB NAME
INSPECTION:MON
APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
BUILDING:
F FOOTTNGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATEF
tr FOUNDATION / STEEL
B FRAMING
n ROOF & SHEER- PLYWOOD NAILING tr
tr
tr
tr
GAS PIPING
tr INSULATION POOL / H. TUB
tr SHEETROCK NAIL
tr
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr GONDUIT r] SUPPLY AIR
tr tr
B FINAL O FINAL
DATE INSPECTOR
tF*
INSPECTION REQI'ES"
TOWN OF VAIL
DATE
READY FOR
LOCATION:
JOB NAME
INSPECTIOo/
l
tr DISAPPROVED D REINSPECTION REQUIRED
BUILDING: PLUMBING:
tr FOOTINGS / STEEL tr UNDERGROUND
D ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEE_
D FRAMING
_ ROOF & SHEEB" PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL tr
tr
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANIGAL:
E] HEATING
fI
tr
o
ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
FINAL tr FINAL
{neenoveo/ coRREcloNS:
oate ,1'l I ' /"/* rNSpEcroR
23 Jr.ne 1982
Mr. Steve Fattergon
Vai t'&rllding Qtparrnwnt
Torm of Veil
Vail, Colordo g!65?,
Dear Mr. P attci.son--
The Owner {ard'Euitder) hovc F.qr# *rat we not fdlow t}re;prsjest.r
cqnstructlon. Errclbs{d foe yoj|. usc qAd.rsviru,ie a gFcc
havc not seen. llqta;{hot
enclosed i*.Adderb
:
I hopc thie.will help
to call me. ,Altlrorgh our buildcr
wet] built prsject.
Jeff Ehrrlesqn,AIA
. elqc losur.og
]:i.-.:. cobell childreil
tt
'll.
(.,.rba
| | childre r t orrilf",{,
1980 wozoo tl(@ot. denvor. colorodo 8020P .303 825-4745
23 Apnil 1982
Mr. Menl in Br iggs
Box 264
Frisco, Colorado 80443
Re: The Hart Addition
Dear Merlin,
The fol lowing is Addenda #l l<:r the Hant Addition. Same should be submitted to Vail
Building Department with Drawings and Specif ications for permit. I believe this answers
most questions from our on-site meeting Wednesday.
ADDENDA #I
Delete foundation Detail # | ' Substitute the following:
Drill into existing foundation to neceive dowels, 2 each at
I'o.c. vertical. Dorvels (#5 r'ebar-) shall be bent, angled
down into existing wall minimum 6". Hor^izontal end to
dowel into nerv wall minimum 2' ,
We concun with your suggestion for lorvering existing foundation wall at Kitchen:
Shore up f loor f rom below. Saw cut existing foundation wall -
Install new plate anchored at 16" o.c., build new cripple
wall up to existing aligning new studs vertically with existing-
Tying floor^ joists to existing foundation wall at Kitchen south:
Use joist hangers for support on existing rim joist. This
is assuming nim joist is continuous; if actual condition is
blccl<ing between joists, remove blocking, bear joists on
existing plate, then neinstall blocking.
Bearing of 8' x 14' beam to 4 x column at Deck:
Use Simpson connecton for beam bearing on top of column.
New f loor ioists to be 16" o. c.
<obell chrldre rt f .o.i.o.1of f burleron o.i.o.
(+
( (:il.),lil , irli(ir\.1 i,i i..lItiii:i. I(-i I
t3
Condially,
Jeff Br.rrleson, AIA
1
A
7
B
9
Top lay<:r of roof sheathing to be 5/8" plywood'
See Detail #'l 2 enclosed for option al lower levcl west
foundation wall .
Reuse existing garbage disPosal .
Reinstall existing stereocabinet as discussed, removing east unit
of book shelving to make room ton new location'
Reuse existing divided lite exterior door and screen from
east dining. Reinstall at new west deck'
Reuse existing divided lite west door in approximately
same location' Eliminate side lites, build gypsum board
stud wall from fireplace to nocth, installing door to swing
nor^th into west Kitchen.
Add to Kitchen trash compactor:
Kitchen Aid KCS-l00 with tnim kit for wood panel'
Modification Drawing to millwork will be issued later'
Shelves in china closet to be glass. Closet to be
lit from the top with recessed incandescent can'
Delete north portion of stone site wall to north of housc'
(West is to remain.) Cantilever f loor joists to support a 4'
wide walkway. Handrail and rryall to be same as for deck '
Additional Drawing to be issued later'.
l0
ll
IL
t4
tI
I
I
I
I
t
I
I
I
Construction Documents Project Manual
HART ADDITION
l2 April 1982
I
I
I
I
I
t
I
I
I
I
t
T
I
t
B-474
JEff
BWt$or{
B-1338
.l 56 Chase Stone Center O
Colorado Springs, Colorado 80902
Phone (303) 471 lBB2
I 192 Gore Creek,.Drive
Vail. Colorado 81657
Phone (303) 416-3129
THE SQUASH BLOSSOM
,4
//
t/
QzL/z*
8 - )1 va-
.4/.U,e=a-." 4-"Jr'/
,?'/- *Z-'r-
/--'f- -caa--zL.4-1.."2 -L -Lvz "1),o
,r-+-, 4. 2,/2--- 4-"- --,^-e--4LJ
-k ; -1Vr*'z- *4* "n--eo*-*/
(w{,
-r-,ZJ E f-Z-/
a-?'L-2/
-/
\
ao ao
i
Ii
II
. zoNE !ilLCI
fors:[, R, n P/s zoNr DISTRICTs
Description: Lot
Architect
Zone District Proposed Use
Legal
0rnter
4 a,o"u Fil ing #2
Setbacks: tront-Requii'ea 26't'--nro'poseo -
Sidcs-Required lS, proposed
Rear -RcquireC l5' proposed
lrla terccu r.se-requ i re d propo sed
GRFA:
GRFA:Primary A'l'lor,red
Secondary Al I or.red
Si te Covcra ge : I.r'l 'l oir'ed
Ar'lor,red i647?. _re.r,,r"=*
/v1t d
Sil-ope
Proposed
Proposcd
Propl;: ed
Actual
Landscaping:
Parking: .
Required
Requi red
flrive: Slope Fermitted
Environniental/llazar.cls: .Ava'lanche
. Flood Plain
. 'S1ope
LOffntents ;.
tl.rtr".:3
cobal I childror t orchitoctr
1980 uozea rlro@t. donvor. colorodo 80909 . 3O3 825-4745
22 March 1982
Mr. James Sayre
Department of Community Development
Town of Vail
Vai I, Colonado Bl 657
Re: Hart House Addition
Dear Mr. Sayre,
Enclosed are the required items for the Design Review Board in two copies.
1 Floor Plans (existing and new).
2 Site Plan.
3 Elevations (new with existing).
4 Photos of existing house.
5 Materials List.
Also enclosed is an existing land survey. We will be wonking on additional information
which will be avai lable at the Design Review Board Meeting.
I will be contacting you later this week to assist with any questions and comments.
enc losure
Jeff Burleson, AIA
coball childre.r.r f.o.i.o.jaf F burleron o.i.o.
--
Project Application
Project Description:
contacr person and pnon" C .(-i . f\r-i'2l_ o[' -l+\k-rG i-{-rt Cr
1
Owner, Address and Phone:
Architect, Address and Phone:
n Lt t)rv6Cr D6d
Legal Descriplion: Lot 4J- , Btock 1ui {3Dr V. , Filing t-, Zone
-
Com ments:
Design Review Board
'^" /frlrn-
DISAPPROVAL
. N,l1;1li 'iil; l,t{i),,1:C'l' HART
' t,l;(;Al, l)!::,1:li il)'l't0N: t.()'l' 4 il1,0(:K
Foof
51d lng
Other l'ial1 Materials
Fascia
Soffits
Windows
l{indow Trim
Doors
Door Trin
Hand or Deck Rails
F lues
Flashings
Chinmeys
Trash Encl osures
Greenhor.rs es
0ther
li ll,ll'l(; Lions Ridge Subdivision #2Lrons firqge Juoor vrs
It Shinqies ro wn
l)lildill li'.1 Ir;.i ()l; l'lt0.,li(;i'_6,35_squane feet total addition: Kitchen Expansion, Master Bedroom
a nd Ba th' Add .T_wo. ( 2 ) _P.99 ks."-Re !_osa te MejlX-l ig ql--R.. g...**_
l'hc foll()r.,ing inforrnlt iorr is rc<1ni r.t:d for :;ulrrir ittal by thc ap|t i(:;rnL I.o the Destl:n tii:v.i cuBoard bcl.t>r'c a fi.naI itl)provill c:rtr bc llivcn:
A. lltll l,lrTiiii MA'l'liRlAl.S TyPc of 1.1:r t j-:f.'lgl (l,r I trr
Rough sawn Sprfuce
w i th weed.ki | | en and
bu nned
allow to weather .
B. LANDSCAPING:
Name of Designer:phone :
PLANT MATERIALS
TREES
SHRUBS
SeeSectionCfor
Cabell Childr ess
1-825-4745
F iel d Stone
White
Insulating Glass Clear
Douglas Fir Olympic f 711 Erown
Spruce. (Same as siding)
Douglas Fir Olympic f71 1 Brown
Douglas Fir'Natur a I
9alvanized lr-ora _ Brown .,. - _*
Galv.Anize!. I r:on - - _ .Brovvr.|. __ -
nuce (Same as sidi
Additipn will retain the chanacter and materials of the
existi nq house .
explahation.
Architects
Common Name Si ze
Aspen
Pine
Botanical Name
(See Sidi
:
GROUND
COVERS
SOD SQUARE FOOTAGT
SEED
TYPT OF
IRRIGATION
TYPE SQUARE FOOTAGE
TYPE OR MTTHOD
OF EROSION CONTROL
0ther
Site
c.Landscape Features (retaining wal1s, fences,swimni ng poo1s, etc.) Please
native tnees and
specify.
s nr'
rowth ofwill be neseeded in natural grasses and allow for
Decks and site wal I ar e shown on the Drawin
i-tl;T r
LION S R IDGE6fu, SUBDIVISION
Ka
siloifll To ?HE BssT or HY tiNowLEDGE Aili{
l,IERg SET AND NO !'ENCES l{ERlj l,OCiiTe$.'.\b}
FILING NO. 2
EAGLE COUNTY
CO LORADO
F:i'. i': i-: i: i-.
NO PROPERTY CORNERS
d*
CI
\d"
\B_
-\8_
\ \,.
"*d)as
oo\
SCALE
C - PIN FOUND
?4
1'.4
,ro,
\'\,, --
,I, WILLIAM E. ARI'IFIELD, BEING A REGISTERED LAND SURVEYOR IN /
TIIE STATE OF,COLORADO, DO HEREBY CERTIFY THAT A SURVEY I'IAS IIADE BY
I.IE A}ID UNDER }IY SUPBRVISION OF LOT 4 LIO}JS RIDGE SUBDIVISION FILING
l'IO. 2, COUNTY OF SUMliIt, STATE OF COLOitADOf AND rOUND THg TI.IO STORY
FRtu\lE BUILDING TO BE LOCITTBD ENTIRELY !{ITHIN THE BoUNDARY LINSS OF
THS ABOVE DESCRIBED PROPEIITY. TI{B LOCATION AND DII.IENSIONS OF ALL
BUTLDINGS, II,,1PROVEI"1ENTS, EI\SSIIENTS AltD RIGIITS OF ;\tAY rli SVIDENCE
OR KNOTJN tO UN AND ENCROACH}IENTS BY OR O}I TIIE PREI-IISES ;"iRE ACCURi'TELY
$ll
t
&ii:
DECEMBER 20, L972
AFrr\,!{ GF.iE
:#x'yl;)
!l Jx L, I
:rt)o
t
liii.il:'(il; I'11i).il:(i1' HART HO
l;ll.ll,iti Lions Ridge Subdivision #2
l;lr:;(.li li'l l(i;; ()l: I'ltU.ll:(l l' 635 square feet total addition: Kitchen Expansion, Master Bedroom
___ar1{_ e
"
t h, A!g_T ryg-!a_D-ecks..-R e l oc q t e Mec bel iS q!--Rooln
]'hc foll(,r'rinLl inforrnetion irr rc< r[1.q{ for sulrrrrittll by t-hc
lloard bclorr: a final itpprovul cirrr bc givcn:
uppl ir:rrnt. to thO Dcsilirr lir:yi1..y
A. lllf ll,lrliiil 144,'l'[nlAl,S
t{oot
Siding
Other l'ial1 Materials
Fascia
Soffits
Windovrs
lYindow Trin
Doors
Door Trin
Hand or Deck Rails
Flues
Flashings
Chimneys
Trash Errclosures
Greenhotrses
Other
'ULc ol ltl;rtj-1L'lal
Asphalt Shingles
!i,-!s
Bnown
Rough sawn SprLce burned
with weed killer and allowed to weather.
Field Stone
Gypsum. Soff it White
lnsulating Glass .Clear
Douglas Fin Olympic #?l1 Brown
' Spr"uce. (Same as siding)
Douglas Fir Olympic #711 Brown
Douglas Fir'Na tura I
Galvanized lron., . Bnown ,,
GaLv.alnized lion -. - ,- Br-own -
Spruce (Same as siding) _
Additipn will retain the character and materials of the
B. LANDSCAPING:
Name of Designer:
Phone :
PLANT MATERIALS
TREES
See Section C fon explahation.
Cabell Chi ldress Architects
Botani ca'l Name Corrnon Name Quanti ty Sl ze
Aspen
Pine
SHRUBS
GROUNO
COVERS
oo
SQUARE FOOTAGE
ro
SOD SQUARE Fo0TAGE
SEED TYPE SQUARE FOOTAGE
TYPE OF
IRRIGATION
TYPE OR METHOD
OF ERO5ION CONTROL
C. 0ther Landscape Features (retaining walls, fences, sw'imrning pools, etc.) P'lease specify.
Site will be neseede.d, ih natural grasses and allow fon gr-owth of native trees and .
shrubs. Decks. and site wd-l.l ane shown on the Drawings. _
\' j"LION S R IDGE
s,5*
i-t*
SUBDIVISION
FILING NO. 2
r EAG L E COU NTY
CO LORADO
lr . Fr ,. F ri" ,L\ !'( '... r-- L.
s
t%
1IAS MADB BY
o.4974
I ,a .-
tAnderson and Hastings
2059 Bryant Street
Denver, Colonado 8O2O4
433-8486
I
I
I
I
I
I
I
I
T
t
I
I
I
t
I
I
t
ARCHITECTS
Cabell Chi ldress Architects
1 980 Wazee Street
Denver, Colonado BA2O2
825-4745
STRUCTURAL
MECHAN ICAL
Mc Fall, Konkel and Kimball
2160 South Clermont Street
Denver, Colorado 80222
753-1260
T
l.
It
ItI
il
I
I
I
I
I
I
I
I
I
I
t
I
t
I
H
INDEX
AIA GENERAL CONDITIONS
SUPPLEMENTARY GENERAL CONDIT IONS
CLEAN ING
DEMOL I T ION
SITEWORK
STONEIVORK
CONCRETE
ROUGH CARPENTRY
FINISH CARPENTRY
GYPSUM BOARD
TILE AND MARBLE
PAINT ING
EQU IPMENT
MECHAN ICAL
ELECTR ICAL
I
I
t
f]\,GLNi.-I1AL5\Jijl)t f Ml-N 1 r\CONI] I T IONS
I TNTENT oF THE DRAwINGS AND sPEclFlcATloNs
r All bui lding materials, systems, and details are to be complete, operating, and in the
I f inest cr-af tsmanl ike manner. The Drawings and Specif ications indicate the intended
I results and leave latitude for accomplishment.
Prior to Construction Pnicing:
The General Contnacton and his field superintendant are to satisfy themselves
that sufficient details, data, and dimensions are provided so that the ful I intent
of the Dnawings and Specifications can be met. if furthen information ig con-
sidened desirable, the Contractor will pr-ovide the Architect with an itemized
list or a red-rnarked set of Drawings noting the requested information. Changes
in the Owner-Contnactor contract ane not expected at this time as matters affecting
price are to be settled prior to pricing.
During Construction:
The Contractor or his field superintendent may at any tirne during construction
nequest funther information of a reasonable nature from the AFchitect.
MANUFACTURERS RECOMMENDED PROCEDUI]ES
All products, systems, manufactured items, etc,, pnovided with directions for use by
the respective manufacturer shall be used accordingl y. Any deviation fnom such di-
rections, unless specifically dinected by the Architect' may warnant nemoval and coc-
rections at the Contnactor{s expense. Conf licts arising due to job conditions shall be
dinected to the Architect'5 attention prior io proceeding '
QUEST IONS
Calt the Architect @25-4?45J when questions arise and before work is done, if possible.
I
I
I
t
I
I
I
I
I
HANGE IN SPECIFI D OR DETAILED MATERIAL OR METHODS
I
I
I
t
I
I
When the Contractor elects to use appnoved subsiitutions'
to coordinate the necessary changes in construction.
ONE MONTH RETURN
One (1) month after occupancy the Owner will provide the
to be corrected or added. The Contractor will provide a
respond promptly to both the conrective and a reasonable
PROMPTNESS AND COURTESY
it will become his responsibi litY
Contnactor with a list of items
pnice fon the aided items and
amount of added items.
The Contractor, his ernpolyees and all Subcontractors will arrive promptly each day at
a time agreed to in the preiiminary meeting with Owner and Architect' Workens will at
all times conduct themselves in a polite and courteous manner to Owner, children' ser-
vants and neighbors .
SGC I
NERAL CONDIT'IONS
YEAR ENp lrylPECTION
Within the thirty (30) days pnior to one (1) year completion of the building, an inspection
of the bui lding will be made to note items to be corrected unden the one (1) year guanantee
and other items the Owner desired to add. The Contractor- will provide a pnice for -the
added items and respond promptly to both the corrective and a reasonable amount of edded
items.
OIAINER OCCUPANCY
The house is presently occupied. This Contractor shall coordinale access' scheduling'
and other phases of the Work (such as power outage . . . ) with the Ownen. He shall make
an effort to not unreasonably disrupt the Owner's routine.
o
SUPPLEMENTARY GE
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
t
I
END OF SECTION
SGC2
I
CLL /rlrl l N(j
GENERAL
r.01
1.02
B
DESCRIPTION (FOR GENERAL GUIDANCE - NOT ALL INCLUSIVE)
Work lncluded: Throughout the construction period, maintain the building and
site in the neighborhood standard of cleanl iness.
QUALITY ASSURANCE
Inspection: Conduct daily inspection, and more often if necessary, to verify
that nequirements of cleanl iness are being met.
Ownen - Architect - Contnactor shall a'gree prior to start of Work' proceedures for
clean-up, material storage, dust control and trash removal.
PRODUCTS
I
I
I
I
I
I
I
I
I
I
I
I
t
I
I
I
I
I
I
2.01
2.42
CLEANING MATERIALS AND EQUIPMENT
Provide personnel , equipment and materials needed to maintain the specified
standard of cl eanl iness.
COMPATIBILITY
use only the cleaning materials and equipment which are compatible with the
surface being cleaned, as necommended by the manufacturer of the material
or as approved by the Afchitect '
EXECUTION
3.01 PROGRESS CLEANING
Genera l:
I Retain all stored items in an orderly arrangement allowing maximum access'
not impeding drainage o|. traffic, and providing the required protection of
ma terial s .
2 DO not allow the accumulation of scrap, debris, waste material , and other
items not required for construction of this Wonk.
3 Provide adequate stonage for all items awaiiing removal from the job site'
observing all requirements for fire protection and protection of the Owners
property.
I
B
(-
B
I
I
I
I
I
I
t
I
I
I
I
I
I
I
I
I
I
I
I
1nt
(ji-Lu\lillN(l
Site:
I Daily, and more often if necessaFy, inspect the site and pick up all scrap'
debris. and waste matepial . Remove all such items to the place designated
for their stonage.
2 Weekly, and more often if necessary, inspect al I arrangements of materials
stoned on the site: restack, tidy or othenwise service all arr-angements to
meet the nequirements of paragraph 3.01*A-1 above'
3 Maintain the site in a neat and orderly condition at all times
of the Architect.
to the approva I
Buildingr
1 Weekly, and more often if necessary, inspect the building and pick up all
s.""p, debris, and waste materisl. Remove all such items to the place
designaied for thein storage.
FINAL CLEANING
Definition: Ixcept as otherwise specifically provided' 'tcleanr' (for the pur--
pose of this Article) shal I be interpreted as meaning the level of cleanliness
generally pnovided by a lady expecting company.
Site: Unless otherwise specifically dinected by the Architect, hose down all
paved areas on the site and all public sidewalks directly adjacent to the site,
completely remove all resultant debris from construction'
Structures:
1 Exterior: Visually inspect ail exterior surfaces and remove all traces of
soil, waste material ,smudges, andother foreign matler. Remove all traces
<>f splashed matef ials from adjacent surfaces. lf necessary to achieve a
uniform degree of exterior cleanliness, hose down the exterior of the
structure. In the event of stubborn stains not on the building at the be-
ginning of the work and not removable with water, the Architect may require
olher cleaning at no additonal cost to the Ownen'
2 Interior: Visually inspect all interion surfaces and remove all traces of
soil, waste material , smudges, and other foreign matter, Remove all
traces of splashed materials from adjacent surfaces. Remove all paint
droppings, labels, spots' stain , and dirt from finished surfaces' Use
only appropriate cleaning matenials and equipment'
3 Glass: Clean all glass inside and outside the Work area'
\
'!
END OF SECTION
DEMOL I T ION
GENERAL
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1 .0i
l:I
B
DESCRIPTION (FOR GENERAL GUIDANCE - NOT ALL INCLUSIVE)
Work Included: Demolition and/or removal for this Work includes, but is no1
necessari ly I imited to:
I Removal and relocation of mechanical equipment and utility lines.
2 Removal of abandoned electrical equipment.
3 Removal of parlitions, windows, platfonms and other items.
4 Exposing of existing stnuctune for connection of addition.
5 Careful removal of cabinets to be reused.
6 Removal of cabinets not to be reused.
? other miscel ianeous demolition indicated on the Drawings and required to
comolete indicated Wonk.
I Opening and material removal of structure and finish for new windows.
9 Dust control ,
Def inition: The term "demol itiont' , as used herein, indicated the removal of all
existing objects designated for removal , plus such othen work as descnibed in
this Section of these Specif ications.
QUALITY ASSURANCE
In addition to complying with all pentinent codes and regulations, comply with
the requirements of all insunance carriers providing coverage for this work.
lnstallers:
1 All Work in this Section to be accompl ished under direct r on-site supervision
of thonoughly trained and experienced journeymen who are completely familiar
with the requirements of this Work and the necommendations contained in the
reference standards.
2 ln acceptance of the finished work, allowance will not be made for lack of
skill on the Dart of the workers'
I
I,UJ
B
DEMOL IT ION
JOB CONDIT IONS
Dust Control: Use all means necessary to prevent spread of dust during
perfonmance of the Work of this Section.
Protect ion:
I Use all means necessany to protect existing objects designated to remain
and, in the event of damage, immediately make al I repairs and replaceme-nts
necessary to the approval of the Architect and at no additional cost to the
Owner.
2 erect barriers, guard rails, enclosuFes, etc, to protect pensonnel , chi ldren,
structure and othen items.
PRODUCTS
I
I
t
T
t
I
I
I
I
I
I
I
I
I
I
I
T
I
2.01 MATER iALS
Provide materials required for proper- completion of the Wonk of this Section.
EXECUTION
J.UI
R
I
--
(^
PREPARAT ION
Notification: Notify the Anchitect and Owner at least two (2) full wonking days
prior to commencing the la/ork of this Section.
Site Inspection:
1 Prior to all work of this section, carefully inspect the entire stnucture and
all objects designated to be removed and to be preserved.
2 Locate all existing active utility lines traversing the construction are and
determine ihe requirements for their- protection.
Clarification:
'l The Drawings do not punpont to show all objects existing.
2 Befone commencing the Work of this Section, verify with the Architect all
objects to be removed and all objects to be presenved.
IJ
E
t
I
I
I
I
I
I
I
I
t
I
I
I
I
I
I
I
I
I
uEMOl. I f lt)f!
Schedul ing:
I Schedule all work in a careful manner with all necessary considenation
for the adjacent area and PeoPle'
2 Avoid interference with the use of, and passage to and from the adjacent
rooms .
Disconnection of Utilities: Before starting site operations, disconnect or
arrange for the disconnection of all utility senvices designated to be nemoved.
Pnotection of Utilities: Presenve in operating conditions all active utilities
traversing the stnucture and designated to remain'
REMOVAL OF DEBRIS
Remove all debnis from the site'and di sposal of all removed materials legally.
Leave the sile in a neat and ordenly condition to the approval of the A.rchitec!.
SALAVAGE
parts, electrical fittings and other reusabl e
Thev are for spar^e parts for the rest ot
-TheContrac|orwiIlmeetwiththeOwnerandAr^chitectpriortoDemoIitionto
agree on whats to be saved '
END OF SECTION
F
3.03
3.04
Save all usable hardware, Plumbing
items , Box them and give to Ownen '
the house .
-
I
I
I
SITEWORK
GENERAL
I 1.0r DESCRrprroN (FoR GENERAL GUTDANcE - NoT ALL rNcLUSrvE)t
Work included is clearing, excavation, removal, compaction, dnain tile,
I backfill, gnading and seeding.
I
PRODUCTSI
2.O1 BACKF ILL
I On-site soiis free of debris may be used for backfill,
I 2.02 GRAVEL
- Maximum size 3/4".
I z.o3 DRAIN rrLE
6" perforated pipe.
I z.o4
'EED
r f 'Natural'r seed mixture.
I
I EXECUTION
3.Oi PREPARATION
I A Surface rock ilichen covered) is to be car-efully removed by hand or netting so
surface is not damaged and stockpiled fon futune use.
I B Clean the minimum area of brush, stumps and debris.I
C Scnape and stockpile top 6'r of top soil saving seed content as possible.
II D Conduct excavation pnocess with particular cane to avoid tree damage to tnunk,
noots or fill over roois.
t E Avoid pushing dint over natural ground cover.
r F Avoid scratching rock outcroppings,
I
t
I
-
I
I
I
I
I
I
I
I
I
t
I
I
I
t
I
I
I
I
I
SITEWORK
SO ILS
Sub-soiltype and characteristics to be detenmined by inspection by owner's
Soil Engineer at time of excavation.
CLEAR ING
The Contractor shall remove those trees or shnubs necessary only for actual
construction of foundations '
BACKF ILL I NG
Fill: Clean free of lange stones and organic debris'
Compaction: Fill under slabs and anound perimeter walls shall be 9570 compacted
in 6'r layers using mechanical tampers.
Do not backfill against foundation walls until concrete lras gained strength and
supporting floors are in place.
DRA INAGE
Mininium finish grading of 12" fall within 10t of the building is essential, insune
pnoper drainage of entire site. Excessive wetting or drying of the foundation
excavation should be avoided during construction.
PUh,IPING AND BAILING
All excavations shall be kept free of water as required to construction forrns,
pour concrete, allow concnete to cure and permit the proper conduct of the Work.
u,lell points or any similar system shall be used. Provide all purnps, hose,
drainage Iines, etc, as may be required to conduct the water away from the site.
Al ldrain l.raten shall be discharged where no damage or injury will result.
Pumps shall be available on the site during excavation operations and until
time as thebasement space is secure from water.
EXCESS EXCAVATED MATER I AL
After backfilling, excess excavated materials shall become the pnoperty of the
Contractor and shall [:e removed from the Owner's property.
GRAVEL
4" layer of gravel is to be provided under all concrete slabs.
DRAIN TILE
Foundation drain shall be provided along the north siCe of the house in a gnavel
fi lled trench at foundation level . The dnairr tile shall enlpty onto grade'
FROST
Protect bottom of excavations from frost. Do not place foundation footings or
sfabs on trozen gnound,
3.o2
3. 03
3.04
A
B
c
3.06
J.U/
3.08
3.09
J. IU
-
I
I
I
I
I
I
I
I
I
I
t
t
I
I
I
I
t
I
I
3.11
3.12
S I TEWORK
ROUGH GRADING
Rough grading requirements will be determined on site by the Architect and
Contnacton '
ROCK EXCAVATION
lf rock is encountered within the limits of the excavation and has sufficient
bear-ing capacity and depth as approved by the Ownents Soils Engineer the
wall shall be laid dinecily on the pock. Where rock is required to be blasted
wonk shall be done by experienced powdermen using small charges and in
stnict accordance wiih all regulations covering this work. Any damage caused
by explosives shall be cornected at Contractot''s expense'
END OF SECTION
SI ONEWOF{K
I
I
I GENERAL
I
I r.o1 DEScRrprroN (FoR GENERAL GUTDANcE - Nor ALL tNCLUSIvE)I
_ A Stonework as building veneen and for site wall and base of deck column.
I 1,02 QUALITY ASSURANCE
I A Installers:
- 1 All work in this Section to be accomplished unden direct, on-site supen-
I ;iil;i""J ffi","'Ji'.ffiffi'.:ii;i:;:'"';;:-'i::11"J'Lill:ifi''""':'i:::''I tained in the refenenced standards.
I 2 In acceptance of the finished work, allowance will not be made for' lack
I of skill on the part of the workers.
- 1.03 STANDARDSrr A Follow Colorado Mansonry Institute Standar^d 301-76'
PRODUCTS
I A Building stone wilt be field stone with lichen 4" to B" thick and 2i squane feet
average face surface .
I B Do not use masonry cernent. Mortar is to be site prepared from Portland Cement,
r hydrated lime (2090 maximum), and clean sand'
I C All joints are to be in full mortar beds. Finished joints ar-e to be tooled with
I a beaded tool and retooled after initial set to obtain tight joint.
I D Take soecial care duning entire process not to damage stone faces.
t f Provide G.l. wire on corrigated ties approximately 16" on center.
I
I
I
t
I
END OF SECTION
I
I
I
I
CONCIiL.T E
I
GENERAL
I 1.01 DEScRlprloN (FoR GENERAL cUTDANCE - Nor ALL INCLUSIvE)t
A Work included is indicated on the Drawings,
I t.o2 ouALtrY AND STANDARDS
,- A Fol low local buildingcode and recommendations of Ac I 301-79.
II B Workers: All Wonk to be accomplished by or under the dinect on-site super-
vision of journeymen carpentens experienced in similar work and familiar with
I code requirements fon concrete wonk.
I
I.03 PRODUCT HANDLING
I A Storage: Store materials and equipment ad dir-ected by the General Contractor.
r 1 .04 TEST tNG
I Retain an independent testing laboratory to take two (2) sets of three (3) cylinders
(ASTM C1?2) and slump tests (ASTM C143\ 7 day and 28 day neponts shall be
I sent to the Architect 'I
FRODUCTS
o nl ,-ONCRETE
I L.v | \.\
I A All concrete shall be 3,000 PSI (28 day) ain entrained $t%o+ 1) redi-mix
(ASTM C-94) with proportions based on a mix used successfully on previous
I projects in the anea. Minimum cement content six (6) sacks per cubic yard.
I B Maximum on truck time to be 1* to 2 hours depending on the weather (concrete held
I longen is to be rejected). Thoroughly consolidate all concrete by vibrating
I and noddins.
C Maximum slumP = 4" '
I 2,O2 RE INFORC ING
I A Reinforcing steel (ASTM A615) Grade 40.
I B Wire mesh reinforcement (6 x 6 / W2.1 x W2. I ) shall be lapped at least one (l)
- full mesh at side and end laps and shallbe wired together'
I
I
rl
I
I
CONCRETE
I 2,03 EXPANSION JOINTS
I- Provide two (2) layers of fiber building feits at the junction of concnete slabs on
grade and vertical walls.I
EXECUTIONI3.01 PREPARATION, PLACING AND FORMWORK
I A Before placement forms shall be thor^oughly wetted on oiled' the reinforecementI shall be thoroughly cleaned of dirt, nust, scale or other coating' and water shall
- be removed from Place of dePosit.
I B Concrete shall be deposited as nearly as practicable in its final position to
avoid segnegation due to rehandl ing on Flowing. The placing of concrete shall
r C When placing is once stanted, it shall be canried on as a continuous openation
I until placement of the panel or section is complete'
D Maintain slabs in a moist condition for a period of at least five (5) days after
I placement.
I
E Forms shall be sufficiently tight to prevent leakage of mortan and shall be propenly
I br-aced to maintain position and shape '
F Forms shall be removed in a maxirnum of thr-ee (3) days ' on as soon as possilhe
without damage or defacement of concrete.
r 3.oz FtNlsH
I
I
he carried on at such a rate that concrete is at all time plastic and flows readily
in to the gpaces between the bans.
Al I exterior exposed concnete sunfaces shall be broonr finished. All other
areasshallbe steel tnowel finish, Use #5 tool at contnol joint.
I 3.03 INSERTS, SLEEVES, ANCHORS
I Build-in sleeves, conduit, etc, as indicated on the Dnawings or as furnished by
I
I
I
other trades, Set securely and level in forms before placeing concrete.
I
I
END OF SECTION
I
I
I
ROUGH CARFENTRY
I
GENERAL
I 1.0r DESCRrprroN tFoR GENERAL GuTDANcE - Nor ALL tNcLUSlvE)t
A Work lncluded: New partitions, blocking and miscellaneous items noted or '
I shown on the Drawings; roofing, insulation, flashing, structural f naming'
I siding and decking.
r 1.02 SUALITY ASSURANCErr A Code: Comply with current locai building code'
I B Workers: All Wonk to be accomplished by or unden the dir-ect on-site supen-
I vision of journeymen carpenters experienced in similar work and familiar with
code requirements for f raming.
I I.O3 PRODUCT HANDLING
I A Storage: Store matenials and equipment as directed by the Gener-al Contractor.
I
2.01 WOOD
I A Framing Lumber: Kiln dried and straight, mixed standard and constructlon'
minimum f = 1100; timber tobe #2 rough sawn hemfir, minimum f = i250'
I B Wall Sheathing: lf2'r exterior DFPA Fir'
C Roof Sheathing: 1/2" CD exterior DFPA Fir'
I D Floor Sheathing: 3/4tt T and G plywood'
I E Siding and Exterior Door-: To match existing. Rough sawn spruce burned with
I weed killer.
- G Decking: 2x4all heart redwood.
r z.oz wEATHERSH IELD
I A Damppnoofing: Two (2) coats asphal tic dampproofing from below lowest slab
I up to 6" below finish grade.
I
B Sheet Metal: 24 gauge galvanized iron (painted)'
C Calking: Pecora 60+ unicrYlic.
I D Roofing: Match existing.
I
PRODUCTS
I
ROUGII CARPENTRY
2.03
B
INSULAT ION
Wal l: Foil face, ful I thick
Roof: Foil face, full htick
Penimeter: StyrofoamRM
batt, minimum
batt, miminum
1-1 /2" x 24't ,
R=19.
R=30.
minimum R = 20.
EXECUTION
I
I
t
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
3.01
B
C
FRAMING AND SHEATHING
All workmanship shall be of the highest grade in every nespect, Framing shall
be done in accondance with the accepted standards of genenal canpentry wot'k,
with al I joints set square, plumb and straight.
Funnish and install all wood nailers, furring, and othen fr-aming and rough
woodwork as necessary to the propen construction and completion of the Wonk.
Stagger sheathing joints. Nail at 6" o.c. at edges; and 8" o.c. at intenmediate
supponts.
Provide 1 x 4 cross bridging not over B'o,c. for all wood joists and 2 x solid
blocking between joist at all supports'
Match installation of exisling sheathing and trim. Notecontinuous vertical members.
WEATHERSHIELD
The dr-y-in roof along with 15# felt wall covering and metal flashings are to fonm
a na in resistant barrier.
Check weathershield system befor e covening to make sur-e moisture is conducted
outside of building by drips, laps, conductons' etc.
Repair all damaged spots with appropniate materials and laps prior to the app-
licaiion of final finish materials'
The l5 - pound dny-in roof felts should be appl ied as early as possible. Lap
6tt (double felts at hips, valleys' and nidges) wall felts lap 4" and should be
applied immediately befone plaster on siding'
Prionto apolying felts, apply gnace bituthene ice and watershield ag shown on
detail and difficult to seal unexposed areas.
Match lap and installation of existing roofing-
D
E
3-02
B
(-
E
D
I
I
I ."; '=::.:::
I
I
I
t
END oF sECrloN
I
I
I
I
I
I
I
I
I
I
I
I
ROUGH CARPENTRY
1 Fit insulation snugly between f naming, to maintain interity of insulation
over entire anea to be insulated as much as possible.
2 Install faced insulation with integral vapor banrien toward wanm-in-winter
side of assembly.
I-
ir
il
lr
FINISH CARPENI-RY
GENERAL
I 1.OI DESCRIPTION (FOR GENERAL GUIDANCE - NOT ALL INCLUSIVE)
I A Work lncluded:
I 1 Wood base throughout, except at tile walls.
2 Doons, jambs and handwane'
I 3 Window jambs and glazing and calking.
I 4 Skylight.
I 5 Cabinet work as shown.
I 6 Miscellaneous wood trim.a
7 Minrors.
I 1.02 SUALITY OF FINISH CARPENTRY
I A Mi lling: All materials to be shaped and glued in an architectural woodwork
I shoP'
- B Qualifications of Installers: Cutting and fitting of trim and finish
I by journeymen finish carpenters (may be assisted by apprentice canpenters)r who ane thoroughly trained and experienced in the skills nequired and who ane
completeiy familiar with the materials involved.
I C Rejectionl In the acceptance or rejection of finish carpentry, no allowance
will be made for lack of skill on the part of workmen.
t D AVrl I Premium Gnade Standards willbe followed.
1 ,03 QUAL ITY OF OTHER M,ATER I ALS
t A lnstallers:
I I All Work in this Section to be accomplished under dinect, on-sile supen-
I vision of thonoughly trained and experienced journeymen who are completely
familiar- with the nequirements of this Work and the recommendations contained
in the neferenced standa rds.
r 2 ln acceptance oI the finished work, allowance will not tre made for lack of
ski ll on the part of the worker^s.
r B Manufacturen's Recommendations: Manufacturenfs recommendations concerning
both methods and maierials shall be strictly adhered to.
r
I
I
I
I
I
I
I
t
I
I
I
I
I
trINISH CARPENTRY
PRODUCTS
I 2.01 FINISH CARPENTRY
I A Exposed Wood: 3,/4t' oak veneer flat cut plywood, 3/4" sol id oak trim, Oak
t to be mixed ned and white to match existing.
r B Rough har dwane, adhesives, sand papen and other miscellaneous matenials
I r-equined for completion of this Work.
2.02 WOOD DOORS
I A Solid Wood Doors: 1-3/4" solid core wood, premium grade (AWl); sizes as
shown on Drawinqs. Veneer shall be oak flat cut'
t B See detail fon job-built exterior door.
r C Wood Door Frames: Shall be oak. See existing fonsizes, thicknesses and profi le
I of membens. Frame to same material as doon.
I
1,04 GLAZING STANDARDS
Follow pentinent recommendations contained in the "Manual of Glazingrr , FGMA.
1.05 PRODUCT HANDLING
A Protection: Use all means necessary to protect the materials of this Section
before, during and aften installation and topnotect the installed work and
materials ol all other trades.
B Replacements: In the event of damage, immediately make all repairs and re-
placements necessary to the approval of the Architect and at no additional cost
to the Ownen.
1.06 SUBMITTAL OF FINISH CARPENTRY
A Samples:
1 Submit a sample of cabinet enclosure l'-0r' x B" x 4" deep with a door.
2 Get Architectrs appnoval of veneer plywood to be used for all exposed
cabinet work .
B Shop Drawings: Shal I be submitted to the Ar^chitect for neview on all cabinet
work'
C Shop Drawings shal I show in large scale the construction of the various pants of
the Work, the methods, of joinery, the pr-ofi les of moldings, provisions for assembly
and installation. They shall show methods of reinforcements, anchorage and
supPort '
I
I
FINISI-I CARPENl-RY
I 2.03 HARDWARE
r A All hardware to match existing.
I z.o4 GLAZTNG AND cALKtNGI
A Glass: 1" banded insulating glass.
I B Calking to be one part GE Silpruf 2000 series, on two parts Polyurethane
Pecona Dynatrol 2; or approved altennate,
I C Mirnors: f o be'l/4" silven backed. Installed with a clear silicone adhesives.
I
2.05 SKYL IGHT
I A Contractor to submit product for Architect approval. Shape to genenally be as
shown on Dra wi ngs .
t B Shop Drawings are required to show connections and flashings.
I EXECUTION
I 3.oi suRFAcE coNDlrloNS
I A lnsoection:
I ' :,;'il:'":l"}."JTi H;;?T:],',";T';'J"[:i'.:'-',i:,'fi:"ll'"0":i;u#.""
this installation may properly commence.
I 2 Verify that finish carpentry may be completed in strict accordance with the.
original design and all pertinent codes and negulations.
I 3 Verify that bui lding insulation may be installed in accondance with the oniginal
design and the manufacturerts recommendat iorrs -
I B Discrepancies:
1 ln the event of discrepancy, immediately notify the Architect.
I 2 Do not oroceed with installation in areas of discnepancy unitl all such
discnepancies have been fully resolved.
I C Scheduling:
I I Coordinate fabrication and installation with all other trades. Respect
I and pnotect matenials of all other trades.
I
I
I
I
I
I
I
I
I
I
I
I
t
I
I
I
I
I
I
I
t
3 .02
B
/-
A
3.04
B
F INISH CARPtsNTRY
WORKMAI.ISHIP OF FTNISH CARPENTRY
General: All finish carpentny shall produce 1:oints, true, tight, and well
nailed with al I members assembled in accordance with the Drawing.
Jo int i ng:
I Make all joint to conceal shrinkage; miter all exterior corners; cope all
interior corners' miter or carf al I end-to-end joints'
2 lnstall all trim in pieces as long as possible, jointing only where solid
support is obtained.
Fastening:
I Install al I items straight, true, level, plumb and fir mly anchor ed in place;
wher.e blocking or backing is nequired, coordinate as necessary with olher
tnades to ensune placement of all requined backing and blocking in a timely
manner.
2 Nail trim with finish nails of pnoper dimension to hold the member firmly
in place without splitting the wood.
3 Screw, do not drive, all wood screws' except that screws may be stanted
by driving and then scnewed home.
F INI SHING F I NI 5H CARPENTRY
Sand papen all finished wood surfaces thoroughly as required to produce a
uniformly smooth surface, al.ways sanding in the direction of the grain, except
do not sind wood which is designed to be left nough; no coarse gr ained sand
papen mark, hammen, mank, on other- impenfections will be accepted'
WOOD DOORS
Fabnicate all wood doons in strict accordance with the refenenced standards
fon the grades specified and as detailed on the Drawings'
I nstallation:
1 lnstall all wood doors for long life under hard use'
2 All handware on wood doors and frames shall be montised into edges, faces,
etc, , neatly and with best wonkmanship'
3 Door shall be hung stnaight' true and plumb'
4 Provide proper tolerances for hardware, taking cane that space between
wood daor and jamb is not in excess 1/16". Bevel strick edge of wood
doors to achieve opening clearance.
5 Install fr ames plumb, rigid and in true alignment'
I
I
I
I
t
I
I
FINISH CARPENI'RY
6 Pre-drill wood door frames for finish nailing to minimize splitting. Do
not set nail head on putty. All fnames shall have saw cut full length of
piece on unexposed surfaces (KERF) to minimize wanpage. Let in all
horizontal members into vertical 1/2" thickness of material , glue and
nail. Ease all shanp edges slightly with sand paper. Loose stops and
casings shall have all cornens mitered neatly.
Touching-Up:
1 Using fine-grained sand paper, completely eliminate all scratches and
abnasions in finished wood sunfaces.
2 Leave all finished wood surfaces ready for painting.
HARDWARE
Deliveries:
Onder- and stockpile all items sufficiently in advance to ensure their availability
and make all necessary delivenies in a timely mannen to ensure orderly progress
of the tota I Work .
Install all finish handwane in strict accondance with the manufactuners' recom-
mendations, eliminating all hinge-bound conditions and makeing all items smoothly
operating and firmly anchored into position.
After har-dware selection, supply hacdware schedule to Architect fon review
befor e orderi ng.
Where possible, shop install cabinet hardware and adjust in the field'
GLAZ ING
lnstall glazing acconding to reference standards. Set all glass in a tnue plane,
tight, and straight, with proper and adequate clearnace, f inmly anchoned to
prevenl rattling and looseness, with all edges cleanly cut; do not nip or seam
the edges .
Mirror: Install with non exposed clear silicone adhesive.
END OF SECTION
a
B
B
I
I
I
I
I
I
I
I
I
I
I
t
? nq
D
3.06
I
I
GYPSUM DRYWALL
t GENERAL
I
I 1.01 DEScRlprtoN (FoR GENERAL GUtDANcE - NoT ALL lNcLUSlvE)r
A Work Included: New walls and ceilings.
I 1.OZ OUALITY ASSURANCE
r A lnstallens:
I
' I All Work in this Section to be accomplished under dinect, on-site super-t iiil;L:'Ji,x':il"TJ"l;:;'.'"iii;fi'".'i,'Tffi::ru":m*"*:.'."'Ti::''I tained in the reference standards.
I 2 ln acceptance of the finished Wonk, allowance will not be made for lack of
I skill on the Part of the workers.
r B Manufacturen's Recommendationsr The manufactunersr recommended methods
I of installation and test certification fon fi ne control shall be the basis for^r accemptance or nejection of actual installation methods used in this Wonk.
I C Refenence Standard: The U.S. Gypsum Company "Gypsum Drywall Construction
t Handbookt'.
I 2.01 MANUFACTURER
USG, Goldr Bond, Flintkote or appnoved alternate'
I 2.02 MATER IALS
I A Gypsum Wallboard: All interior gypsum panels shall be the pr'oduct of one (1)
I manufactuner-, and shall be tapered edge for finished sunfaces and butt edge foc
concealed sunfaces, 1/Ztt thick. Waten resistant wall board is required at toilet
room walls.
I B Trim:
I 1 Metal Cornerbead for extenior corner edges (USG, Dur-a-Bead #101).
I 2 Metal casing bead' concealed type (usc' #200 series)'
I C Texture: Non-asbestos spray type, Anchitect to appnove sample'
I
I
PRODUCTS
I
I
GYPSUM DRYWALL
I EXECUTION
I 3.OI SURFACE CONDITIONSI
A Inspection:
I I Pr-ior to all Work of this Section, carefully inspect the installed work of
all other trades 3nd verify that all such work is complete to the point '
where this installation may properly commence'
t 2 Verifv that allstuds are plumb befone pnoceeding, as out-of-plumb walls
after gypsum board installation will be the respondsibility (to correct)
of the gYPsum board installers.
Ir 3.02 tNSTALLATtoN oF GyPSUM BOARD
I A Genenal: Install all panels plumb, level , and with all ventical joints on bearing.
I
B Cutting: Permanufacturerrsrecommendations.
t C Fastening:
I i Properly space all fasteners in carefull accordance with the manufacturerrs
I recommendations and code requirements, with heads driven slightly below
the surface for proper cementing, but without breaking the paper coven'
I 2 Loosely butt all joints to be taped, lirmly butt all joints to be left untreated.
I
3 Stagger all end joint an the joint between panels to achieve a maximum of
bridging and a minimum of continued joints '
I 3.03 INSTALLATION OF METAL TRIM
I A General: All.exposed edges and outside corners to have metal trim.
3.04 T.APING AND FINISHING
t A General: The finish product shall be a smooih surface. The Contracton may
opt to achieve this by the finishing operationsl i. e. , gypsum panels may have
I some kinks if the final product is true and smooth'
t
- B Environmental Conditions:
I
' I Contr-ol heating and ventilating during f inishing operations to ensure the
maintenance of 55 degree F . minimum tempenature.
I 2 Use minimum 200 watt light shining at an angle to wall surface during taping
ooeration to assure smooth and minimal appearance of joints.
I C Texture: Apply a light orange peal texture.
I END OF SECTION
I
I
I
I'ILE AND i,4AREiLE
GENERAL
I
I 1,01 DESCRIPTIoN (FoR GENERAL GUIDANCE - NOT ALL II{CLUSIVE)I
A Work Included: Provide and install tile on walls and f loors indicated in the
I Bathroom (see Finish Schedule). Pnovide and install marble in dressing and
I closet .
PRODUCTS
I z.or MoRTAR AND cALKrrucI
_ A Organic Adhesive: ANSI A 136.1 . Type ll.
I E Bonding Agent: "Tile Bond" as f loor primer and in ;rdhesive and grout.
r C All mar-ble joints shall be calked in latex.
r z,oz T rLE
I Latco Venetian Glass lulosaic Tile (3,/4" x 3/411) with !)ermabond bed and grout.
t Three (3) colors will be selected and patterned.
I 2.03 MARBLE
I To be selected by Owner-. Marble shall be 3l4tt thi cV .
EXECUTIONI
t 3.01 INSPECT|ON
I A Pr-ion to installation, inspect the work of other trade: to venify that work is
I complete to a point wher-e application of the tile and r.rarble may properly com-
mence,
I B Coordinate installation of cabinets, electnical and plrrmbing.I
3 . 02 I NST ALLAT I Ol.l OF T I LE
I A Follow methods as described in the Tile Council of A:nerica "Handbook f or-
Ceramic Tile Installation". W231 (walls), B51l an<.i 514 (tub and shower) '
I B Install tile full height (f loor to ceiling) on shower snr:losuFe, and tub gurround.
I
I
I
I
o
t_t_ ANIJ M,\ l{ lJr. r_
I 3.03 INSTALLATION OF MARBLE
- A lnstallation shall be by experienced expert craf tsmen-
I B All marble shall be field measur ed and shop cut prior to installation.
I
C All holes shall be field measured and shop installed.
I D Mechanical clips and louvers shall be shop installed'
3.04 CLEANING
It A Upon completion of this Work, remove all excess materials and debris arising
fnom this Work and leave the work and working area in a neat and'orderly
condition to:the approval of the Archi tect.
END OF SECTION
I
t
I
I
I
I
I
I
I
I
I
I
I
I
I
TtrA INT ING
I GENERAL
I I.01 DESCRIPTIoN (FoR GENERAL GUIDANCE _ NOT ALL INCLUSIVE)t
A Wor-k Included: Painting of old and new sunfaces as indicated in 'rExecution"
I in tfris Section. All surface prepanation and patch other than patching
I required in Gypsum Drywall Section'
I B Def inition: The term I'paint", as used henein, includes enamels, paints,
I sealers, filler, emulsions, and other coatings, whether used as pr-ime, inter-
mediate or finish coat.
I 1.a? ouALtrY ASSuRANcEI
A lnstallers:
I I All work in the Section to be accomplished under direct, on-site super-
vision of thonoughly tra ined and experienced journeymen who are completely
farnilian with the nequirements of this Work and the recommendations con-
I tained in the reference standands.
2 ln acceptance of the finished wonk, allowance will not be rnade for lack
of skill on the part of the wonkens.
I
B Manufactunersr Recommendat ions: Manufacturers' recommendations concerning
I both methods and maierials shall be strictly adhened to'
I I.03 PRODUCT HANDLING
A Delivery: All.paints and siiirilar materials must Lle delivered in the original
container, with the seals unbroken and lable intact
B Protectionl
1 Store mater-ials at the job site only in a suitable and designated area re-
stricted to the stonage of paint materials and related equipment.
2 Use all means necessary to ensure the safe stonage and use of paint matenials
and prompt and safe disposal of waste.
C Touch-Up Supplies: At cornpletion of job, supply the Owner with one (1) marked
gallon of each color and gloss useo.
I
t
I
I
I
I
I
I
I
I
PA ltJl' I rnG
I PRODUCIS
2
B AII
I
I
I
I
2.A1 PAINT MATERIALS
Manufaclurer:
All oaint materials strall be the Martin senoun Free Spirit Low Luster
Latex Enamel .
Oil Finish: lVatco Danish Oil Finish (natural).
paint colors to be selected to match existing.
EXECUTION
B
I
I
I
I
I
T
I
I
I
t
I
I
3. 01
A
3.O2
r-
SURFACE CONDITIONS
Inspection: The Painting Contnactor shall be responsible for inspecting the
work of others pnior to the applications of any paint or- fi nishing matenial '
lf any surface to be finished cannot be put to propen condition for finishing
by customany cleaning' sanding, and the putty operations, the Painting Con-
tractor shall immediately notify the General Contnactor in writing' or assume
responsibility for and rectify any unsatisfactory finish resulting'
D isc repa nc ies:
1 ln the event of discrepancy, immedialely notify the Anchitect '
2 Do not proceed with instailation in areas of discrepancy until all such
discnepancies have been fully resolved.
PREPARAT I Of'l OF SURFACES' GENERAL
protection: Pr-ior to all surface preparation and painting operations ' completely
mask, remove, or otherwise adequately pr-otect all hardware, accessories,
machined surfaces, plates, lighting fixtures, and similar items in contact with
painted surfaces, but not scheduled to receive paint'
Friming: Spot prime all metals which ane to be painted with emulsion paints'
using a primer recommended Lry the manufacturer of the coating system'
Cleaning:
I Eiefore applying paint or other surface tneatment, thoroughly clean all
surfaces involved '
2 Adjacent surfaces and floons are to be free of loose dirt and dust during
painring and drYing Peniod.
3 Sjchedule all cleaning and painting so that dust and other contarninants ft-om
the cleaning process will not fall on wel , newly painted sunfaces'
tr'
a
I
I
I
I
I
I
I
I
I
I
I
t
I
I
I
I
I
I
I
3.03
A
3.04
PA II{T II{G
PREFARATION OF METAL SURFACES
As recommended bY manufacturer '
FAINT APPLICATION
General:
1 Paint all surfacest except.glass' ma:lry ' and similar iiems' not
pre-finished and not calied out as unfinished'
2 Paint all gnilles and other pne-finished items where the factory pre-finish
is not in u""otout'"I ;;;;'il; Fainting Schedule and color selection'
3 Finished surfaceg to be uniform in color t texture and sheen'
Envi ronmental Condi tions:
1 Comply with the manufactunen's recommendations as to enviconmental con-
ditions under which the coating systems may be appl ied'
2A||materialstooeappliedunderadequatei||imination.
Moi stur-e Content:
r Use a moisture rneten approved by the Architect to test surfaces'
2 Danot apply the initial coating until moisture rneter reading is within limits
recommended by the paint materials nranufacturen'
Defects:Sandanddustbetweencoatsto|emovea|ldefectsvisib|etotheun_
uil.a uy" from a distanc of five feet'
INSPECT ION
General: Do not apply additiolaf 33at1 until completed sampl.e coat has been
inspected.na upp"oJui Oo tr't Anchitect' ii"t"t to 1'03-A above')
REINSTALLATION OF REMOVED ITEMS
Following completion of painting in each spacet qromptly r^einstall all items
nemoved for painting, using only workmen-Jkilied in the particular tnade'
CLEANING UP
General:
D
3.05
J.UO
3.07
A
1 During Progress
tainers or other
that PurPose '
of the Work, do not allow the accumulation of empty con-
eXcessitemsexceptinareasspecificallysetasidefor
2 Prevent accidental spilling of .paint matei rals and' in the event of such spi ll'
immediate|y""*ou"ll.|..oiruamateria|sandthewasteorotherequipment
usedtocleanuptf'espifi'andwashtft"suniacetorheinoriginalundamaged
condition, alt at no adii tional cost to the Owner'
i'
ll
I
I
I
I
I
I
t
I
I
I
PA INT ING
I B Pnior to Final Inspection: Upon completion of this pontion of the l,Vonk visually
I inspect all surfaces and remove all paint and traces of paint forin sunfaces not
scheduled to be Painted.
I 3.09 PArNT rNG scHEDuLEI
A Natural Wood Finish: All natural wood and plywood unless othenwise noted.
'| New Wood:
a Back prime all trim and doon jambs.
b Two (2) coats Watco Danish Oil Natural f inish in strict accondance with
maufacturerts instnuction. (Wipe well between coats.)
B Gypsum Board, Low Luster Finish: All exposed gypsum board.
I Prime coat (tinted).
2 One (l) finistr coat, Free Spirit Low Luster latex enamet .
C Pa rt ic leboa nd (Unexposed).
1 P n irne coat.
2 One (1) finish coat, Free Spirit Low Lusten Latex Enamel.
D Exterior Steel and Inon:
1 Wash G.l. with wanm vinegan water.
2 One (1)of chromatic metal primer (if not pre-primed ).
3 Two(2) coats semi-gloss exterior oil base enamel .
E EXTERIOR TRIM
A Olympic Stain #71 I to match existing.
I END oF sECrloN
I
I
I
I
I
l
I
EAU IPMFNT
GENERAL
I r.0r FuRNtsH AND TNSTALL THE FoLLowtNG:
I A Electnic Cooktop: Modern Maid ET-350 built in four (4) burner cooktop. '
Brushed chrome finish.
B Gass Cooktop: Modern Main KGT-341 bui lt in two (2) bunner cooktop.
Brushed chrome f inish.
r C Vent Hood: Broan ducted model 1420. Black glass and aluminum trim.
I D Oven: Thermador model CMT 21. Micro thermal oven.
I
I
I
I
I
I
I
I
t
I
I
I
I
END OF SECTION
1
MECI]ANC IAL
GENERAL
1 .01 DESCRIPTION (FOR GENERAL
Work Included: lnstall Plumbing
orilles and thermal insulation as
GUIDANCE _ NOT ALL INCLUSIVE)
f ixtures, fittings, heating elements, contnol ,
indicaled on the Drawings -
PRODUCTS
I
I
I
I
I
I
I
I
I
I
I
I
l
I
I
I
I
I
I
z.a1
A
PLUMBING
Provide matenials r-equired for the proper inslallation of the following fixtures:
1 Bathtub Fittings: Kohler K6B?4 with showenhead. Stainless steel pop-up
drain to be selected bY Architect'
2 ToiIet: Koh|en San Raphae| K-3395-EB with white seat and cover.
3 Bathroom Lav: Elkay Lustertone RLR-12, LK-'l dnain fitting'
4LavFittings:Kohler-TritonllK-T40ST,notailpieceordrain'
5 Kitchen Sink: Elkay LUstertone LMR-3322-C (see fittings beiow)'
6 Sink Fittings: lnstitutional LK431/SPGN?'A/AE-25/BH=4'
7 Garbage Disposal: ElkaY LKD-60'
Fixture colons to be selected by Owner'
HEAT ING
Provide materials required for the pnoper installation of heating and exhaust
system, contnols and gri lles.
B
2.OZ
EXECUTION
3.01 PLUMBING INSTALLATION
lnstall and secure all fixtures per
as indicated on the Drawings ' All
and floors or countertoPs and form
Stop valves shall be furnished and
Soi I and Waste Lines.
Branch lines shall have aminimum fall
placed a nrinimum of 5'-0" o 'c '
code, manufacturers necommendations and
fixtunes shall be secure and tight to walls
a sound installation.
insta I led at all fixtures'
B
of 1 inch per 4 feet. Hangers shall be
t
MECHAN ICAL
I
I Each fixture shall be vented in accordance with sound plumbing pnactice and
I appl icable codes ot vent stack through the roof. Make every effort to tie to
- existing wast and supply vents and lines.
I D Clean outs:
I
Ful I size brass cleanout plugs shall be installed at the base of each drain and
I waste niser and stack and wherever pipes change dinection or othenwise nequire I
I cleanouts for poper cleaning of entine drainage system.
r E Piping:
I Soil pipe shall be standard weight cast iron bell and spigot with lead and oakum
jo ints ,
I Waten piping shall be hard drawn copper with brass fittings and soldered
connections.
t 3.02 HEAT ING
A Contnactor is to move furnace, hot water heaten to new location shown on
I the Dr^awings.t
B Contractor to submit to Architect for review (and approval befone starting work)
I a sketch and written discription of wonk proposed to heat the new addi tion.
t C Contr^actor shall opt between an electnic baseboard system or extending the
r existing forced air system.
- D New system shall pnovide adequate heat to supply in the space 72o F temperatuFe
with an outside temperature of -140 F.
I E Contractor to also pnopose system for toilet exhaust and kitchen venthood.
I
END OF SECTION
I
I
I
I
I
t
L
I
I
I
ELECTR ICAL
GENERAL
I r.0r DESCRrprtoN (FoR GENERAL DUTDANCE - Nor ALL rNcLusrvE)I
_ A Work of this Division shall include furnishing all labor, equipment, supplies and
materials necessary for the installation of all electrical systems shown on the
I Drawings.
B All electrical work shall be done in accordance with local and National Electrical
I Code.
C Contnactor- shall ar nange and pay for all permits, fees and taxes.
I D All materials, equipment, and devices shall be new and appnoved by Under^wniters
:aboratories, lnc.
I 1 .O2 SUMBTTTALS
r A Submit a wnitten description of pnoposed panel box circuitry and if new panel ,
I its connection to the existing senvice.
PRODUCTST
I
I
I
I
2.01 MATER I ALS
A Supply the following fixtures and all necessary items for their insta{lation and
operations according to NEC codes.
B Light Fixtures: To be selected, include in bid an allowance of $2,600.00 for
purchase of lights.
C Cover plates and switching devices to match existing.
EXECUTION
I 3.01 rt{sTALLAT roN
I
A Install all devices as recommended by manufacturer and according to code.
B Gang all switches and receptacles whenever possible-
C Switches at + 40" unless noted otherwise (to centeni ine).
D Receptacles at + 18r' unless noted otherwise (to center line).I
T
I
I
I
I
ELEC TR ICAL
E Completely install entire electrical systern as indicated. Furnish and install
minor items ornitted but obviously necessary for a complete job.
Provide temporary electnical service and distribution. Remove temponay
wiring upon completion of the job.
G Verify senvice location with local utility company.
H Good wonkmanship and appearance are considered of equal importance with
electrical and mechanical operati on.
I Provide all cutting and patching necessary fon electrical work; arrange with
Contractor for necessary openings and chases.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
J Provide trenching and backfilling requi r-ed for own work. Backf ill in accordance
with Soecif ications.
K Pnovide all nraterials which ane new, first quality, and approved by Underwr^iters
Laboratories, Inc. Replace and pay for matenials and equipment damaged during
course of installation. Substitute materials and equipment must be appnoved
by Architect .
L Test entine electrical svstem prior to completion of work. Show that all equipment
is in good openating orden.
M Provide Owner with guarantee that materials and wonkmanship are free from
defects for one (1) year from date of acceptance of work.
N Pnovide a complete overall wiring system. Conceal all wiring runs.
1 Provide rigid galvanized conduit whene exposed to the weather and for-
enclosing main grounding conductor '
2 Pnovide flexible conduit for f inal coritlections to motors and recessed
fixtures. Use liquid-tight flexible where exposed to weather or in wet
locations.
3 Where nequired by local code, provide EMT for runs in walls and ceilings
and where exposed to dry areas. Do not install in floor slab which is
in contact with the ground.
4 Provide PVC conduits for nuns in on unden ground f loon slab and whene
buried in earth. Provide PVC conduits which are heavy wall, Schedule 40,
(90 degrees Centigrade (EPC) and U 'L. listed.
5 Provide appr-oved couplings and connectors for all conduit naceways-
Make all joints t ight.
6 Non-metallic shielded cable may be used where permitted by local code'
I
ELECTR iCAL
I
t O Coor^dinate locations of outlets and electrical equipment with that of other
t crafts so that electrical equipment is not blocked, inaccessible or inopenable.
Provide outlet boxes minimum size #14 AWG. Pnovide Type THHN conductors
when circuit is near noof deck or in noof insulation. Feeders #6 and larger
I shall be 600 volt, TYPe THW.
P Funnish and install all lishting fixtunes and lamps, and supponts as required.
I All ballasts shall be ETL/CBM certif ied, supen iow heat, pnotective devices, a
I Advance Mark ltl, energy saver, full light output, or an equivalent ballast as
manufactuned by Jefferson or Universal .
t o 5;i[fl:Hffi:"1: "",i'.;rui:i"["r1:lJ"T';""'#';*;"i:',jffi:.tisconnect
I
END OF SECT IOI{t
I
I
I
I
I
I
I
I
t
I
I
J
{t-
UJ
LT
IP
N II-
Ztu.t
?Lr-a<
I
I
I
o
.7_J v l'-{ (\r{
! rL!-^[1i/ 1J- ^{ 'oH: vl?-
qN ur .u'
QJ ',r X/.\Li\) -A
1DJe;E,^ ofr
*hfi
d (a
<. Ot tlft F-.t !r-r 3Mtr tI
"s[ tr E
\rj
7
F.
cnri
)J
rxd{tul :ytd=v
6'rlF
-o*314!q ut
F
v c\)
Xy
'P'st
\)
4
F
ti-
J
_J
;
=lll2
l--
c\
rY
))
4
,(\z,
a!l
)
4
\tz
tr
9-x
lrl
I
I
I
I
I
I
I
I
I
I
t
I
I
,r ,t t $YL"Q Atu x -'@ 24" o,a.
t
I
I
I
I
2.
0
6
7.
tt)
o
Y
u
UJ
a)
UJI
*4'< g tG" a,c,HORIZONITAL
*4'+ @ lo" o.c .
\r, E r<T lcA L
-te
I-r I
*r'. * \'l_d'
?<2\r,/EL:3e 24"o.c
t
I
-(rf
KEYE?J At,!T
, l'- A"I i'-(.
aa
9TONa Letr&.
F2"d r.u*tlo"
@ 44" o,c,*
I
I
LE
=L5
?ou<.E;> <.-::-)r{--
\\/ ,\ | | -\r: -- -<-.r= r'fJe_ |FoF< R.E r l-.-l F= .
- r<gv EP - iq )i u-i
-.4 |
r- /4 v\vlr-\t-:<Qow=-t-3
,, @ 44" o,<=,
i
i
I
t
foof innn I tro
f.J \J \r | \-,,.
,^1+\llplcce woll
\-,1
ln\J ll I
tt
TYr .5TE.Fz/Ax - t'
FO<)\ IF-JG
I
I
I
I
I
I
I
t
I
I
I
I
I
I
I
I
I
I
I
3lFA?3Ot.J:F:6 44 F -51
E5A5E FOK
BEAN/4 ot€
t-^lFlhJGRAPE
-- (4)oE * [s'
tat'Q ?teK
\,/ERT v'7
.,t 3 -T.lE9 e' l&" o.c'
(3)tr4 . €A \^/a\
oorT,
pier ond footing
a o 6'
DtI 'n$76higo ild_<nll Jx* I
H ir-s I
r
7.
tlJ
)
u17
ti ltr
5ur< r^t'
n ls,
rVU
60
+I
il
F
fi
T
r'l
h-)a-
o
v
"f,
ul
dt..i
uHurtloYxlel
i
o
<r!ilnY2
aul?n
,O;)(A;Ih*
ltJ
{
M-)
M
tll
t-u
4r
r0
J
Jf
rfi
1l-
:rI-t{
0l
i$,
0.'
l0t7. .d
T fr:E
:n t u
Iti[r$
ili tL$*tl -, \\t
s*fribs.H
I
I
I
I
I
I
I
I
I
t
I
I
I
I
t
I
I
I
I
u
t'r
0
rll
J
z
NT
{Pl
I oI
[*
ooD 5|D1NA
.< _ FeuTS
I=iIFELTS
{-METAL €TgP
FLAs}tIh-JG
6I.l-UI:T{EFIE
PLYvdooo
Ir*
I
It--\
Ye'
2t'
fiaAMltrlC2 /vr-sp€7 Fetrs)t' tr6," oN llcrRrzoilTaLf
I'..6'DP VEF:TICAL
f St NGLe 3 oJtDe
sHesT)-
I
l,1
{
&
rI
I
u
D
IJ
3tudNhauru
0
o
]>J
l'-
t'!.x
td'
z
-o
($
I
fuJ
o
{t
N
bJfr
o
,or
rl
u
|-
n
6
I;I
a
I
I
I
I
t fi
{
It
tlx
(t
Ud
f t',.
!s-_
tl
o
b
Frnt
lrr
0o
til
ill
il!i
u{
IJ
u
U
]A
I
I
I
I
I
I
I t
Zo' o.c. lhJ [rJAl-[-
uJ€eP rcu€s ?'6lL.
F1EUD STANE-fO MAT6H
FX lSTrt...lc,
?AOE. IFJ R-A6€\"r- cor{6
++@ 32oo,e:
re€ PEall.ltu(z ceelue
W.Q 4U 5rTE.D€AINg;o PE v) f oeAD€
n*a
CONTEoL JOINttTs
AA CAIL OUT ON SLIEET I
?&"o'c ' ! . L
-i-- - -
r ,l Att
1l l
't-o"
MAx.
t^$Ll- AbT,TVOT-1i) g€ vEelFtgD
t,J f ^eAt-i rT€Cil-
rN -ruEi Fi€LD.
2Y'4 €.€Dudc:c>
UtrART (^JOOD DECK
{" C.oxlt.-
SLAB
10
oo
)
> T€tM fc>
DgE L^)IUDOtJ
gAtg u-,e.
l-.llN6€s To
MAIZ,A
trlNl5i-{ oF
8eL6 AJJ-'
gfq" ffio oxv-,
PL{uJOo O Q/
*u;D OAV-
2 X MllElesE>,Sue€.ouNP \
(sru.ne A6 CAB'NETS )
11
ex. wp TtrtM
() , \r.\ .
.\ t utvr.-r,v urrtDE
TPtV.,-----+-/ ,-GvP BD.
i:i\.;7: -;:
k"*o-.o*!lo"e 24" o'al-
GVe ea
I
t
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
J-
I
il{t
'lflrl
'l
i
I
-f*
:I
nn -:
ilJ +--l
*4'+ 4 16tlvE r<Tt €At-
2
J-
0
rr)
ooI
I
I il--a' I lll' ; rsll I tre" i
r I I Anu"uoI' l. ,/ lL2-f r r-
r.-_--: r '- ' lSoF€tT
I lF:=:-*?t F-."--....=_'1:F::=:=F
a / vENrHooP-J
I \ Ar>L_usro-B-e ..-1-oY.!-, -=?*:*
I
I
I
I
A.DJ.
3{ELVFS
' crv P 6P
RA:>TIC LAM.
t,
I' \ Lrrclc>D PALJ€L-
tl
I
t
I
Ir
T
n
I
I l3
CTRTIFICATF r::Sllfqr /-.- -\ r:
eriliiruc ernrunn - :
T;,lof fr.tt:: tfllCt i rri
CEIITIFNCATE OF OCCUPAruCY
NUMBER. OF
OWELLING UN ITS
FT. rN HETGHT ANo sHALL coNFoRM ttf ccxsrRl:rrox
BASEMEI{T WALLS OR FOUNDATION
o
U)
"6.r
.ct
z
'oo
z
rt
L
o
$
(n
(D
a
r-t
fi
(D
z
,J
"o(D
z
.=
.-l
5n -:!r Z z':=x xJ
3 F>
E- F!.r .
a Z, -t!) zr -Y'..*
;.
I C ...'.
a i'*
c >-i
o r-1
o >.
I
I
1
:
: tr
I
.o
z
oo
F-t
o
t-
I t
BUITDING DIVISION OF
EAGLE COUNW; P.o. BOX 789
couRTHousE, EAGLE, CO.-PH. (3O3) 328.6339
DATE
o""r,"on, Vern Tator Construction
pERMrr ro Add f ron t porch (__t sroRy(TYFE oF tMPRovEMENT)NO.
BUILDING
PERMIT
Hay 19 0968
AD DRESS
( !1o,,( 9TR EE T)(coNTR'3 LICENSE)
NUMBER OF
DWELLING UI{ITS
(PROFOSED U3E)
ZON INGAr (LocArroN) l40t Lionsridqe Loop DrsrRrcr_(NO.) (3TFEET)
Giilsi:r nEeo-
BETIvEEN AND
(CROSS STREET)g
ILo
o
D
oz:
v.
.ot 4
".o.*
-
"t?J.
suB0lv 15 roN
BUILDING IS FT. IT{ HEIGHT ANO SHALL CONFORM IN
TO TYPE
TO BE
-
FT, WIDE BY
-
FT. LONG BY
USE GROUP BASEMENT WALLS OR FOUNDAT IOh
REMARKS:
AREA OR
VOLU ME
(CUBIC/SQUAFE FEET}
OWNER Rlchard Hart
l40l Lionsridqe Loop. Va
EsrrMArED cosr $ A,noo.oo FEE"'t g 5t,5o
bc compleled by anthorized ogent of orvncr)
BUI LD ING
ADDRESS
(Afliddvif on ievcire ddc of opplicotion fo
EAGLE
FINAL:
Review
couNTY BUt LfrPERMIT AppLt cATt oN
C/O INSPECTION, LANDSCAPE INSPECTION FORM
RoutingForm ( ) PrimaryRouting ( ) Rerouting
Permit No.
-7. '(-?{
Date Ref erred -
\/ .,---., r'L/o ne H/,1. qJ2 2 /./ A.Location ' Plannirrg Commission File No.
Review and return to the County Buildirg Official within 6 working days
Applicant
Planning: Complies with:
Subdivi sion Regul ations
Zoning Regulations
Site Plan (Landscaping)
Commerrts:
Reviewed by:
Recommend Approval :
No
Htrn
Yes
HtrF
Date:
County Engineer: Roads
Grading
Drainage
Comments:
Recommend Approval :
unn
tr
Inn
tr
County Health: Water
Sanitation
Perc. test 6E Recommend Approvat U-
Final Inspection: C/O
Recommend Approval
Comments:
DN
Firral Inspection: Landscapi
Recommend Approval
Commerrts:
ng!n
C,/o lssued
Final Filing Date
by Date
EAGLE DuNTY
Eogle, Colorodo
OFFICIAL RECEIPT
REcETvED . .^. oate 7lL?' t( , rc7Y
or >)-.*,,-4"nn O*;t-.;t**-t
CASH
ITEM
Bu ildinq Permit Fee
Application For
Su bd ivision A lication
Zone Chan
Conditional Use
Specia I Use
Va ria nce
Appeal Fee
Code: (Building (Zoning) (Su bd ivision)
Total Received
All items are received for
no-payment of any item.
Ne 353?
AMOUNT
JO
collection only and this receipt shall be cancelled tor
Iar'i
ING TAPPL,#'*I
BUILD
Juridiction
Applicant to complete numbered Epaces only.
PLAN CHECK VALIDATION
Rq #sss7
WHEN PROPERLY VALIDATED IN THIS SPACEI THIS IS YOUB P€RMIT
PERMIT VALIDATION
:
I oE3Ct.1f$.e ^ttoc*ro ""..r1L4
MArL
^OOtEst
Uo,,
cor{ lF ac To i
f 7,
ARCHITECI OR DESICI{Eh LICENSE NO.
MA tl aootE!s ICENSE NO,
L ENo5.&-\ , ,6 ' g** /. "/ //o, .
'u"""ff.o -l Q.
8 CIASSOf WOrK: I NEW EifiOOITION O ALTERATION O REPAIR tr MOVE D REMOVE
L
{
l0 Change of use lrom
1l Vaf uation of work: $ L _ OO D PERMIT FEE
SPECIAL CONDITIONS:
Size ol Bldg.
(Totall sq. Ft.
Fire Sprinkleas
Requirea [y". f]p6APPIICATION ACCEPTEO BY:PLANS CHECKEO 8Y APPROVEO FOA ISSUANCE 8Y
No. ot
Dwelllng Unlts
OFFSTREET PARKING SPACES:
NOT ICE
SEPARATE PERMITS ARE REOUIREO FOR ELECTRTCAL, PLUMB.
ING, HEATING, VENTILATING OR AIR CONDITIONING.
THIS PERMIT BECOMES NULL AND VOID IF WORK OR CONSTBUC-TION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS, ORIF CONSTRUCTION OR WORK IS SUSPENDED ON NAEruOOruCOFOR A PERIOD OF 12O DAYS AT ANY TIME AFTEB WOHK IS
COMM ENCED.
r_ !1ERFgY CERT|F\/ THAT I HAVE REAO ANO EXAMTNEO TH|S
4PP LLC-4T !O-N AND KNOW THE SAME TO BE TRUE nruO CO-nneCl.A.!L pRovrstoNs oF LAws ANo oRDtNANCES covEENtNG THtsIy?E_.9F -w-oB11 !ry1!L BE coMpLtEo wrrH wnErxen spEcrrreo
b_EB-Erfi oB Ngtr-IrHE GRANTTNG OF *. pERMtT DOEs NOTIIE.REIN (JI{ N9'. IIHE GRANTING OF A PERMIT DOES NpFqiuME To FvErlAUrHoRtry ro y'toLATE on ca-N-cEL r?B9v!sl'!+ts 9F Ar\|v orHER srATE-ar(tocAL LAw CEGttArlTHE PE R!']RMANCIE /OF CONSTRJ'CTI
5 | ONATU RE Of -tttN TiAC tOt Oi Au
HEALTH DEPT.
FIRE OEPT,
5OI L REPORT
OTHER (Speclly)
Form 1OO.1 1.r/INSPECIOR
E-C'#
t."ii-?
--a/"
BUILDING PERAAIT APPLICATION
ABpticant to complete numbered spaces only.
(DsEE ArracHEo sHEET)
MA IL DDiESS LICENgE NO.
ARCH IIECT Oi O€5IGN€i LICENSE NO.
Llc€r!5E 110 .
o
usE or BUt tDlr{ 6
I
8 ClassoIworK: trNEW DADDITION trALTERATION trREPAIR f]MOVE IREMOVE
I Describe work:
l0 Change of use lrom
1l Valuation of work: $ , -' - )
PLAN CHECK FEE PERMIT FEE
SPECIAL CONDITIONS:
Size ol Bldg.
(Totar) Sq. Ft.
No. of
St ories
Fire Sprinklers
Required !ys. [N.APPLlCAT]OAI ACCEPTEO 8Y APPROVED fOF ISSUANCE BY
No. of
Dwetlin9 Un its
OFFS TREEI PARKING SPACES.
NOT IC E
SEPARATE PERMITS ARE REOUIRED FOR ELECTRICAL, PLUMB.
ING, HEATING, VENTILATING OB AIR CONDITIONING.
THIS PERMIT BECOMES NULL AND VOtD IF WORK OR CONSTRUC-TION AUTHORIZED IS NOT COMMENCED WITHIN 120 DAYS, ORIF CONSTRUCTION OB WORK IS SUSPENDED OR ABANDONEDFOR A PERIOD OF 120 DAYS AT ANY TIME AFTER WORK IS
COIIIMENCED.
I HEREBY CERTIFY THAT I HAVE REAO AND EXAMINED THIS
SPPLICATTON AND KNOW TBE SAME TO BE TRUE ANO CORRECT.ALL PROVISIONS OF LAWS ANO ORDINANCES GOVERNING THISTy?E oF woRK wtLL BE coMpltED wtrH WHETHER spECtFtEDH.EREIN OR NOT. THE GRANTING OF A PERMIT OOES NOT
?FESUITE To crvE AUTHoRtry ro vrou,ri on callcEl rHE?Bgylsrorys oF ANrr orHER srATE oR LocAL LAW neour-Arlr,+cCONSTRUCTION OR THE PERFORMANCE OF CONS-CUtTION.
SiCNATI]iE OI CONTRAC-rOR OR UTHOFIZEO ACEN'T (DA'E}
FI RE DEPT.
SO IL REPORT
OTHER (Speclfy)
PLAN CHECK VALIDATION
WHEN PROPERLY VALIDATED (IN THIS SPACE) THIS IS YOUR PERMIT
PERMIT VALIDATION
E(TRA COPYForm I OO.1 177
M.O.
l-y'P r.N\ .r
^FN{
'T= /
L ION S RIDGE
SUBDIVISION
FI L ING
EAG LE
B
r! ^ rr .\ r- |i"'-\ l-(. t_, l-_ L_t-.
"'""'
(o,-
\JA
NO. 2
COU NTY
CO LORADO
SCALE 1'=5C."
O _ PIN FOUND
\
\
t'ai
,41
\\
I, TiILLI;.)1 E. ,"itl.:F-IitlD, il5 ING A REGISTEiIED LAND SUii.VEYOR. IN
rt ts s'ti,'lc oi' ccr,(i:r.',DJ, oo ui':;r:-:gv cg.t'I'rFy 'i'rlA'r A su:iviiy it*s }.IADE'ilY
i:8.\ilD U)iDrltt ilY Stit'l:lllVlSlO:t Ol'LOT 4 LIOIiS RIDGE StiBi)IVJSIOIT FILIIlC
ilo. ?-, COijN'lY OII .5Ul1i'iiT, SI'i:rri O!' COLO;1i'DO, .'iND I"OUND 'i;;ii '1"1O S'.fOrlY
i'il..q::i.l ilUIi,l)1ilG'rO Dii LOC,,'f]jD t:r'i'Tlt:tLY:'tITllfN Tllll llOU);D..iiY LINiiS c;L:
1'llli ,''BOVii DUSC.lIB:'lD PII,OPlt.t'fY. 'I'ilti LOC.iTION iillD DII'lSNSlOliS OF ALL
BUILDIl;cs, L1lPi{Ovill.iEii'l'S, E,\Sti:;jli IS ;'lID ir.ICil'IS OP "lAY I}i iiVIDE};CE
oit Kl:o;]i{ 'fo }ifi,';UiD.uilcto,'1cilt:it)i'ls BY o:l o{ 'litF; PREI'l isns .iiiE }'ccui{.:'I'rLY
SilO;ill 'fO TilI 3iiS'i' Oir I'iY Ii.NOh'l.UDCli i".i.r(Tj .1J
itiiltE SU't t,i:D )iO f'ENCFIS lICiiE l,OC;''f;;i1r)i
D'C'r'irlijrr 20' Lelz rnor'r{'?F.!((f-*il#-fiff {i.,,;n
\.tXt"",;...,r.9(#
\'/ai,:r::nlii\Y'
ra"w
,/,/ \../
\
\
TWO sTORY \
FRAME SUII-OINE \9/'$. 14 \
s'o {,t/3ot._--.-.--ud
\\,
\.\
\a\
\1\
'rIfl
\o_
\
\
.Z-- wooden
GARAGE p porch
9-
si_5,-
\€.:;d
64 'fireplace
(2.o'x 4.o')4?
7-
LOT 4
SoYo
\\
\\
\\
\
{'
v
v
1;,:rfir rr 0,:E
'BUILDING DIVISION
P. O. BOX 179
PHONE:328-6339
rNseecrGru
EAGLE COU
FIEClUEST.
NTY
DATE JOB NAME
TIME RECEIVED- AM PM CALLER
E orHen
MON
COMMENTS:
TUE
f]panlnl.LOCATION
READY FOR INSPECTI ON
WED THUR FRI AM PM
I nppRovED
! uporu rne
CORRECTIONS
Ll DTSAPPROVED
FOLLOWING CORR ECTIONS:
! nerNsPEcr
DATE
IN SPE CTO R
tgr trl[, vlul{tt Et lffiItslgnl,
t
slllot
rylfryt
RECEMEff!h lt'. I Frr Dbt ftt
JUt I s B7s
Depl. al p,.n
o1pL--.. 7 v4-<- {/U
IG'I' P. IJUT3FU,>"
,ffi*l%rrlIEII EDr G(|ISIT|I
tnu'L^ /?tu4'l
rlfir illnr, cort8iDltrt
t./ - C I /Kn,-*" ) &!r,fu 11f --'--
Illr ffil'rti|c|, cG.tlfi -tt
[lfi Js llr lg?0
o+rr &[dl!f D0rtcr ry. W //
INSF'EC NtTrcl FIEOUEST
OUNTY
JOB NAME
TIME RECEIVED- AM PM CALLER
II
go'
,tN$
SHE
BOOF
.a.,:,lrAL.-
loN
eleci"tce,,
ttr*'t*"
" FrNoa wDcs.
PARTIAL
:
n ornen n pnnrrnl.LOCATI ON
READY FOR INSPECTION
MON
COMMENTS:
TH UR AM PMTUE,.;;-E-r
.,.'wED -ll./
FRI
El,AppRovED
I uporu rne
CORRECTIONS
LIDISAPPROVED
FOLLOWING CORRECTIONS:
LJ REINSPECT
s1i'
DATE
INSPECTOR
t 0')"''' ':'' '.
INSPECTTctN FtEEUEST.-BUILDING DIVISION
P. O. BOX 179
PHONE:328-6339
-- 1"q
,t -- .' l"'DATE t- t' .:'\' ,JOB NAME
TfME REcEf vED- AM pM c^LLEa L,/:0--4.1."J
I orHen
MON
GOMMENTS:
I pnnrrnl. LocATroN
READY FOR INSPECTION
THUR
(:-' -t'
AM PM
El'{pp RovE D D otsappRovED ! nrrNSPEcr
fl uporu rHE FoLLowrNG coRRECTToNS:
CORRECTIONS
I
,-t
' .t^t
INSPECTORL