Table Of Contents
Executive Summary
Environmental Impact Report
( Stewart EnvironmentaVMontane Environmental Solutions)
Preliminary Geotechnical Investigation and Geologic Hazards Study
( Koechlein Engineering/Town of Vail hazard map)
Traific Impact Study
( TDA Colorado,Inc. )
Drainage Report / Utility Letters of Service
( Peak Land Consultants )
Alta Survey / Preliminary Plat
Topographic Map / Adjacent Land Use
Slope Analysis / Concept Site and Grading
Concept Utility Plan
Executive Summary
This application is a formal request to the Planning and Environmenlal Commission for a preliminary plat,
to re-zone a portion of the Mountain Bell site, and to amend Vail's Land Use Plan.
The preliminary plat has been included to describe a piece of ground approximately 6.6 acres in size at the
south edge of tie Mountain Bell site along Vail's North Frontage Road. The preliminary plat documents
indicate ihe proposed boundary and access through the site. The roadway through the site is intended to be
a private drive meeting all Town of Vail standard. Utility easements have been shown to allow all required
utilities to serve the future proposed buildings.
Simultaneously, with our request for the preliminary pla! this is a request to re-zone the 6.6-acre parcel
from its existing zoning of NAPD and G to the H zone district. The re-zoning will allow affordable living
units to be designed foi the site and to address a significant need for the Town of Vail. It is also the intent
ofthis development to design an early childhood learning center for the community. The 2 existing
children's ceniers would be-consolidated into a single upgraded facility where improved services and
program s could be developed.
The final request of ttris submittal is for an amerdment to Vail's Land Use plan. Specifically, we are
requesting that the subject 6.6 acre parcel be revised from open space to residential use. We believe this
request iiappropriate as it is intended to address a very real need for housing the employees that work for
buiinesses in the community. It will also provide sigrificantly upgmded facilities for the early leaming
center for lhe community.
The application follows the submittal requirements of Chapter 3, Title | 3 of the Town of Vail Zoning
Regu lations for Major SuMivisions.
The submittal includes an environmental impact report, a preliminary geotechnical investigation of
anticipated subsurFace soil and glound water mnditions, a geologic hazards study addressing the hazard
zones of the site and m itigation techniques, a traffic impact analysis and a written drainage report for the
site.
Specific items requested in 13.3.3 (items A-M) have been addressed in this submittal. hdividual drawings
requested have been included. These are the topographic plan, concept site plan including proposed
grading, existing mnditions on adjacent property within 200', graphic representation of all areas of the site
with a 40% slope or greater, dre preliminary plat plan and the Alta survey. We also have included a
conceptual utility plan with letters of service fiom the appopriate utilities companies.
Collectively, these docum€nts clearly describe the existing and proposed conditions. Additional specifio
information will be put forth with the development plan submittal after approval of the re-zoning and land
use amendment are in place
o
\,
o
o
LK
t
I
I
I
I
t
STEWART ENWRONMEMAT CONSUITAAT]s,'NC.
Consulting Engineers and Scientists
Ottlce & Laboratory:
3801 Automation Way, Suite 200
Fort Collins, Colorado 80525
(970) 226-ss00
Fpx (970) 226-4946
stewart@webaccess. net
Ip
t
I
I
I
I
I
to
Envi ron mental I mpact Repo rt
for the proposed
Middle Creek Village
Vail, Colorado
Prepared by:
Stewaft Environmental Consultants, I nc.
Consulting Engineers and Scienfisfs
Fort Collins. Colorado
I
I
August 2001
I
TABLE OF CONTENTS
I
I
I
I
I
t
I
I
T
I
I
t
I
Location Map
Aerial Photo
Site Map
Photographs
APPENDICES
A. Eagle County List
1.
2.
3.
4.
t
I
t
I
I
t
t
t
I
t
t
T
I
t
t
I. INTRODUCTION
Odell Architects, PC retained Stewart Environmental Consultants Inc. to perform an
Environmental lmpact Assessment of the proposed Middle Creek Village development. The
property is located adjacent to the Mountain Bell facility, directly north across Interstate 70 from
Vail Village. The proposed project consists of multi-family housing constructed on a 6.5-acre
site owned by the Town of Vail. The purpose of the project is to provide affordable housing for
people currently employed in Vail, who are presently living in or near the community. 1ne
groject owner is coughlin and company, 140 East 19th Ave., Suite 700, Denver, cblorado
80203-1035.
The site location is depicted on Figures 1 through 3. Photographs of the site are provided as
Figure 4.
II. PURPOSE
Th9 PurPose of performing the Environmental lmpact Assessment is to achieve the following
objectives:
A. Availability of lnformation: To ensure that complete information on the environmental
gffects of the proposed project is available to the Town Council, the Planning and
Environmental Commission, and the general public.
B. Environmental Protection A Criterion: To ensure that long-term protection of the
environment is a guiding criterion in project planning, and that land use and development
decisions, both public and private, take into account the relative merits of possible
alternative actions.
C. Review and Evaluation Procedure: To provide procedures for local review and
evaluation of the environmental effects of proposed projects prior to granting of permits
or other authorizations for commencement of development.
D. Avoid Geologic Hazard Areas: To ensure that the buildings are not constructed ingeologic hazard areas, by way of illustration, flood plains, avalanche paths, rocKall
areas, where such hazard cannot practically be mitigated to the satisfaction of the
Planning and Environmental Commission and the Town Council.
E. Protect Water Quality: To ensure that the quality of surface water and ground water
within the Town of Vail will be protected from adverse impacts and/or degradation due to
construction activities. [ord. 37 (1980) 10: ord. 19 (197e M: ord. 8 (1973) 16.100]
t
Stewaft Environmental Consultants, Inc.
Page 1 of 14I
I
2850-001 Environmental lmpact Report
Middle Creek Village
Vail, Colorado
T
I
I
I
t
I
t
T
III. PROJECT BACKGROUND AND DESCRIPTION
Site Concept
The initial conceptual design approach for Middle Creek Village housing is meant to reflect a
new model of multi family housing in mountain communities. The site parameters and
community context were the prime motivators for the layout of the buildings and parking;
however, the solution incorporates some planning principles of a more "urban" nature.
The buildings are arranged around a pedestrian oriented "street" which creates an axis running
east to west across the site. The "street" rises to the center of the project, following the
contours of the site. Entries into individual units as well as project amenities will occur along the
path, and it is envisioned to include both hardscape and landscape areas. The pedestrian
street will be an active place reminiscent of other village centers in the community.
Encouraging the use of alternate transportation, our team proposes to work with the Colorado
Department of Transportation and the Town of Vail to create a project specific transit stop, as
well as develop pedestrian and bicycle access from the site into town. These are accessible to
the residences along a central pedestrian spine that runs down the hill and through a two-story
opening in the center building, ending at the proposed transit stop. Given that a large segment
of the market for this project will be seasonal employees, our team believes the daily use of the
automobile can be minimal. Consequently, the relationship between the car and the building is
downplayed in our solution.
Separating vehicle parking from the buildings allows the project to create a pedestrian oriented"village" character and allows the buildings to be sited closer together, thus visually reinforcing
this image. This is similar to the exterior pedestrian spaces created by the architecture at areai
9u9! as Bridge Street in Vail Village and Lionshead Village. The siting of the parking areas
behind the buildings will also help shield views of the lots from the frontage road and from
across the valley.
The Early Learning Center has been sited to the far eastern edge of the site, but is easiry
accessible from the residences on the loop road. This configuration provides a nicely separated
site for the children's facility.
The overall site concept adheres closely to the existing contours of the site. The buildings rise
and-fall across the length of the site with the terrain, creating an undulating profile thatlurther
reinforces the "village" concept.
Buildins Goncept
Further reinforcing the "village" concept, the buildings are designed as three separate buildingtypes' All the buildings will be one unit deep, creating cross flow ventilation and economy of
construction. There are no enclosed walkways or stairtowers, as the site allows the majority of
units to be accessed at grade. Intemal floor plans will develop stacked plumbing cores, and-the
mix of units will be designed to minimize structural offsets and maximize construction simplicity.
Each of the six residential buildings includes a one-story element on the end which houses
laundry and storage facilities for that building. The building orientation creates maximum
2850-001 Environmental lmpact Report
Middle Creek Village
Vail, Colorado
I
I
I
T
I
I
I
t Stewaft Envimnmental Consuftants, lnc.
Page 2 ot 14
I
I
I
t
t
I
I
southern exposure for every unit. The fact that the buildings are simply one unit deepcreates
excellent opportunities for flow-through ventilation. Our proposal will incorporate highly efficient
mechanical and electrical designs. We believe on a scale of zero to five our development will
achieve a five, or the highest efficiency rating available. Since all units are accessed from grade
or a small stair, there are no interior corridors to heat or cool, further enhancing overall energyefficiency. Please refer to our preliminary LEED evaluation in Section Vt-..1 for additionil
information on energy and sustainability.
The overall character of the building design is meant to reinforce the "village" concept, with
varying building types, massing, and styles creating a cohesive whole. Stylistically, we will
incorporate the tradition of Vail Valley architecture while maintaining an economicit Oesign.
This can be achieved by the judicious use of distinct design elements throughout the project. In
a cost sensitive project, forms may be simple, but the sensitive use of massing, scale, and
rhythm can create an architecture that is respectful of, and complimentary to, tne surrounding
architecture of Vail Valley. The exciting architectural design and pedestrian street space wiii
create a of choice for potential employees.
IV. SITE DESCRIPTION AND ENVIRONMENTAL INVENTORY
Location
The subject property is an irregular shaped, approximate 6.5-acre mountainside site; its locationis described as a part of the South Tz of the Southeast % of Section 6, Township 5 South,
Range 80 west of the 6h PM, Town of Vail, Eagle county, colorado. The property adjoins the
existing Mountain Bell property located north of the l-70 North Frontage Road.
Zoninq
A majority of the subject site is presently zoned 'NAPD" (Natural Area Preservation District),
and a small portion of the site where two early learning centers are located is zoned "d';(9eneral). The proposed project will require rezoning the 6.5-acre site to the designation "H'
(Housing).
Site Usase
The property is owned by the Town of Vail. Onsite development includes two small wooden
slruct-ures presently housing early childhood learning centers. They are located direcily east of
the offsite Mountain Bell structure. Site development plans call for demolition of the two early
childhood learning facility structures with construction of a new leaming center at the southeasi
portion of the site. The remainder of the site is undeveloped open land except for the existing
1oa-! 9nd parking area that serves the off-site Mountain Bell facility and the oniiteearly leaming-
facilities. The proposed use of the property was described in section l, above.
Hvdrologic Gonditions
No surface bodies of water are located on the proposed project site. Onsite surface drainage is
mainly via sheet flow and is generally southerly, although the westem portion of the site likely
drains to Middle Creek, located off site just to the west of the entry road. A man-made drainage
2850-001 Environmental lmpact Report
Middle Creek Village
Vail. Colorado
I
I
I
T
T
I
I
I
I Stewaft Envircnmental Consultants, lnc.
Page 3 of 14
I
I
I
I
t
I
I
I
channel adjoins the eastern side of the Mountain Bell structure. Soil and drainage issues are
described in reports provided under separate cover by Koechlein Engineering and Peak Land
Consultants, Inc.
Geolosic Conditions
A geologic report by RJ lrish, Consulting Engineering Geologist, Inc. is provided under separate
cover.
Biotic Conditions
Ecologically, the property is located in the Montane Zone at elevations of approximately 8,220 to
8,300 feet above mean sea level on a southerly aspect. Regarding plant communities, the site
is described as complex as it contains elements of several communities. These include
Montane Grasslands and Mixed Mountain Shrubland located on the eastern portion of the
mountainside with Aspen stands occuring at the southeastern portion of the site. These
communities include representatives of most of the life forms of the plant kingdom including
ferns, grasses, forbes, shrubs, and trees. Native and non-native vegetation is present including
invasive species of noxious weeds. The western area of the property is mainly Montane
Riparian Forest dominated by Narrow-leaf Cottonwoods (Populus angustafolia) and a scattering
of Thin-leaf Alder (Alnus incana) and Aspen (Populus tremuloides). Presence of Aspen as weil
as species of invasive weedy forbes indicate the likelihood of past disturbance such as fire.
Climax community species such as Colorado Blue Spruce (Picea pungens) are located off site
higher up the Middle Creek drainage, but Blue Spruce and other climax community trees were
not observed on site.
Wildlife uses the site; large mammals including deer and elk browse on the Serviceberry and
Current located in the Mixed Mountain Shrubland Community. Other mammals including Black
Bear, coyote, Fox, Rabbits, chipmunks, Golden-mantle Ground squirrels, Pocket Gopheis, and
other rodent species likely feed and/or inhabit the site. Reptiles, such as species of Garter
Snakes also likely inhabit the site. No major wildlife migratory roules appear to be located on
site. Although Middle Creek is located off site directly west of the property's western boundary,
the creek is not likely used as a migratory corridor. InterstateT0 and development adjoining the
south side of l-70 preclude use of the corridor for migratory use. Middle Creek is contained
within a culvert from the north side of l-70 to its confluence with Gore Creek south of l-70.
No known threatened or endangered species of plants or animals have been identified at thesite. However, no onsite surveys for such species are known to have been performed. The
Colorado Natural Heritage Program's Conseruation Status Handbook (1999) lists the status of
various animals, plants, and plant communities found in Eagle county. A copy of the Eagle
County list is provided in Appendix A.
We recommend having the Colorado Natural Heritage Program perform a GIS "Environmental
Review" of the subject site and adjacent area. The review searches known ecological
information regarding the status of plants, plant communities, and animals within a specifieO
radius of the subject property. The review will report the status of these communities.
Middle Creek, a relatively pristine stream that likely contains Native Cutthroat Trout, traverses
the adjacent property to the west of the subject site. The creek flows out of a saddle located to
2850-001 Environmental lmpact Report
Middle Creek Village
Vail. Colorado
I
I
I
t
I
t
I
t Stewaft Environmental Consultants. lnc.
Page 4 ot 14
I
t
I
I
T
I
I
I
the north upslope from the site. lt flows southerly down slope, jogs west around the Mountain
Bell building, and then flows southerly for approximately 150 feet paralleling the west side of the
entry road to Mountain Bell. lt enters a culvert beneath l-70 and the associated frontage roads
and flows through the culvert south of l-70 to its discharge point into Gore Creek south of the
interstate. Gore Creek flows westerly to its confluence with the Eagle River near Minturn.
The existing creek channel may not be the historic creek channel. Stream modification
(channelization) appears to have been conducted upstream of the culvert adjacent to the entry
road. This 150-foot reach is likely the closest location of the stream to the subject property.
The stream bank, as well as its associated vegetation, appears disturbed along this reach.
Observed vegetation was mainly upland in nature with both native (Western wheat grass-
Agropyron sp.) and non-native species of grasses (brome-Bromus enurmus), as well as
invasive noxious weeds (See Figure 4 photographs, page 2). Upstream from this reach and off
site from the subject property, a riparian corridor of wetland vegetation adjoins the stream
channel.
Adjoining the east side of the entry road, adjacent to its 150-foot north/south orientation, is a
Nanow-leaf Cottonwood (Populus angustifolia) community. This species is referenced in the
U.S. Department of the Interior, Fish and Wldlife Service publication, National List of Plant
Specles That Occur ln Wetlands: lntermountain (Region 8). lts indicator category is listed as
"Facultative", which is described as "Equally likely to occur in wetlands or nonwetlands
(estimated probability 34o/o-66Vo). The presence of this community may be due to a former
location of the stream channel or may be due to high groundwater conditions existing near the
stream channel.
The Nanow-leaf Cottonwood Community conlinues to the north (off site) and south (on site) of
the entry road after the road turns east. Figure 4 Photographs, page 2, depicts the entry road
along its easVwest orientation with the Narrow-leaf Cottonwood Community adjoining both sides
of the road. The presence of this community is an indicator of the potential existence of
wetlands; it does not necessarily confirm their presence. Actual wetland existence can only be
determined by performing a wetland assessment, which not only considers vegetation type, but
also investigates other factors including the presence of hydric soils and wetland hydrology.
Montane Environmental Solutions of Vail, Colorado is presently investigating wetland issues at
the site. A letter regarding the status of their investigation is provided under separate cover.
V. ENVIRONMENTAL CONCERNS AND RECOMMENDATIONS
The proposed Middle Creek Village will impact plant and animal communities presently
inhabiting the property. Site development including earth moving activities and building/parking
lot construction will strip a majority of the existing native and non-native vegetation and displace
wildlife from the approximate 6.5-acre site. However, existing vegetation and wildlife are not
site specific. Surrounding property to the north, east, and west contain vast square miles of
similar plant communities, wildlife habitat, and wildlife species. The loss of these 6.5 acres
does not represent a significant impact to the plant and animal communities. Displaced wildlife
will find and inhabit nearby similar habitat.
2850-001 Environmental lmpact Report
Middle Creek Village
Vail, Colorado
I
I
T
I
t
t
T
T Stewaft Envircnmental Consultants. I nc.
Page 5 of 14
I
T
t
I
I
I
I
I
I
I
I
I
I
T
Landscaping including grass, shrubs, and trees will cover a minimum of 30% of the developed
site. Middle Creek Village will be sensitively integrated into environmental surroundings. Birds,
insects, and possibly small mammals will utilize the landscaped areas, which will mitigate some
habitat loss.
The presence of Middle Creek Village will have impacts on use of adjacent property by wildlife-
particularly large mammals. lncreased human presence and reflected light may influence
adjoining habitat use. Adjoining property is private so that residents of the village should not be
using adjoining properties. Human/bear interaction is possible. All trash dumpsters will need to
be covered and othenalse made bear proof. Lighting designed to reduce reflected light and
conform to the Town of Vail building code will be incorporated into the site design.
lmpact to Middle Creek from surface runoff will be minimized. Potential impacts include
grease/oil runoff from paved parking areas and sand/gravel runoff from winter sanding of roads.
The location of accumulated snow piles resulting from plowing will be addressed. The piles will
be located such that snowmelt containing grease, oil, silt, sand, and gravel do not impact Middle
and Gore Creeks. Any such contaminants discharged to Middle Creek may impair water
quality of the creek and potentially impact the fisheries of both Middle and Gore Creeks.
Engineered drainage swales, berms, dikes, etc. will be incorporated into the project design to
prevent impact to Middle Creek. Construction will be in accordance with all applicable local,
state, and federal regulations and standards. lf dewatering is required during construction,
water will be retained on site. As previously referenced, drainage issues are addressed in a
report under separate cover.
Montane Environmental Solutions is performing a wetland assessment. As previously
referenced, a potential exists for the existence of jurisdictional wetlands in the vicinity of the
Narrow-leaf Cottonwood Forest located adjacent to the existing access road. The presence of
this community is an indicator of the potential existence of wetlands; it does not necessarily
confirm their presence. We recommend performing a wetland assessment conforming to US
Army Corps of Engineers (The Corps) guidelines. lf on-site wetlands are identified, several
alternatives are available. These include: 1) establishing development setbacks from the
wetlands 2) wetlands can be taken through the 404 Permitting process and replacement
performed to mitigate the loss or 3) if the wetlands are below minimum surface areas
established by the Corps,, they may be removed and built upon. lf on-site jurisdictional
wetlands are identified, The Corps is the agency regulating such matters.
A parking facility is proposed at a location just east of the Mountain Bell structure. Middle Creek
lies north and west of this area. lmpacts to the riparian conidor and wildlife using the corridor
adjacent to Middle Creek will to be minimized. This can be accomplished by constructing the
parking area as far as possible from Middle Creek. Drainage issues as previously referenced
are also a concern in this area of the site. Engineered drainage swales, berms, dikes, etc. will
be incorporated into the project design to prevent impact to Middle Creek.
Stewaft Environmental Consultants. lnc.
Page 6 of 14I
t
2850-001 Environmental lmpact Report
Middle Creek Village
Vail. Colorado
T
I
t
T
I
I
T
I
I
T
I
t
I
I
VI. OTHER ENVIRONMENTAL CONDITIONS
A. Land Acquisitions and Displacements
The impact is "Generally Not Significant".
Approximately 6.5 acres of land is required; the developer/project owner is Coughlin and
Company, 140 East 19thAve., Suite 700, Denver, CO 80203-10gS. fne Town of Vailbwns the
land. lt is proposed that the Town of Vail will lease the site to the developer for a 53-year period
at which time the property will revert to the Town.
Two displacements will result from implementation of the proposed project. The ABC and the
Leaming Tree early childhood learning centers will be displaced. The existing buildings will be
demolished, and new facilities will be constructed at the southeastern portion oi tne site.
State regulations require a full National Emissions Standards for Hazardous Air Pollutants
(NESHAP) asbestos inspection of the buildings prior to demolition. lf the inspection identifies
asbestos-containing materials, regulations require their removal prior to demolition of the
buildings.
No minority communities, households, or minority-owned businesses are located on site, and
therefore, will not be impacted by any potential negative environmental concerns such as noise,
air, or water pollution; or from the construction of the facility.
B. Land Use and Zoninq
The impact is "Generally Not Significant'.
A majority of the subject site is presently zoned 'NAPD' (Natural Area Preservation District),
and a small portion of the site where two early learning centers are located is zoned G. Th;
proposed project will require rezoning to the designation ,,H,' (Housing).
C. Visual Conditions
Parking areas will be located behind housing thereby shielding it from view from the Town ofVail. Overall project form and massing is in character with existing Vail Village. The height,
mass, and materials that will be used in the proposed Middle Creek Village will convey a sense
of permanence and contextual and regional appropriateness.
D. Air Qualitv
The impact is "Generally Not Significant'.
The project will conform to all applicable local, state, and federal air quality regulations and
standards, including, but not limited to those regulating odor, dust, fumes of gases, which are
noxious, toxic, or conosive, and suspended solid or liquid particles.
Stewaft Envircnmental Consultants. lnc.
PageT ol 14I
I
2850-001 Environmental lmpact Report
Middle Creek Village
Vail, Colorado
I
I
t
I
Fireplaces will not be installed in the developmentthereby eliminating wood smoke. There will
be no balconies or decks that would provide space for grills or barbecues. There may be a grill
in a public area of the complex.
The Middle Creek Village project is designed to discourage vehicle usage and encourage other
modes of transportation such as buses, biking, and walking. TDA of Colorado performed a
transportation impact analysis regarding the proposed Middle Creek Village. Their report is
provided under separate cover. The report indicates that the impact of traffic generated by the
proposed project will be "Generally Not Significant".
E. Noise
The impact is "Generally Not Significant'.
Stewart Environmental identified no noise-sensitive land uses on adjacent properties. The
proposed site is located adjacent to the north side of l-70. The noise from the interstate is far
greater than any that would be produced by the development.
F. Lisht Pollution
The Middle Creek Village development will have minimal light trespass from the residential
buildings.
G. Floodinq
The impact is'Possibly Significant".
Peak Land Consultants, Inc. addresses flooding issues in a report provided under separate
cover.
H. Navigable Waterwavs and Coastal Zones
The impact is'Generally Not Significant".
The proposed site is not located near or affected by a navigable waterway or a coastal zone.
l. Traffic and Parkinq
The impact is'Generally Not Significant".
TDA of Colorado performed a traffic study. Their report is provided under separate cover.
J. Energy Requirements and Potential for Conservation
The impact is'Generally Not Significant".
The proposed project is expected to result in energy conservation. The Vail Affordable Housing
Project, Vail, Colorado incorporates principles of sustainable design and utilizes design
strategies to reduce its energy and environmental impact. The U.S. Green Building Council's
2850-001 Environmental lmpact Report
Middle Creek Village
Vail. Colorado
I
I
I
I
Io
I
I
T
I
I
I
I
T Stewatt Environmental Consultants, lnc.
Page 8 of 14
I
I
t
I
I
I
I
I
Leadership in Energy and Environmental Design (LEED) rating system is here used as a
preliminary sustainable design measure of the project. As it is currently written, LEED version
2.0 is a system designed to rate new and existing commercial, institutional, and high-rise
residential buildings. lt specifically rates low-rise residential projects. The USGBC is currently
developing a residential version of the LEED rating system. Nevertheless, the sustainable
design principles embodied in LEED v. 2.0 serves as useful goals, guidelines, and measure for
sustainable features of the Vail Affordable Housing Project.
The LEED rating system consists of seven prerequisite criteria and 32 user-selected criteria
organized into five categories:
r Sustainable Site Developmentr Water Efficiency. Energy and Atmosphereo Materials and Resourceso Indoor Environmental Quality
LEED is a voluntary, consensus-based, market-driven building rating system based on availableproven technology that evaluates environmental performance from a 'whole building"
perspective over a building's life cycle. The following preliminary LEED analysis incorporates
input from the design team to more accurately evaluate the conceptual design of the Vail
Affordable Housing Project.
K. Construction
The impact is "Generally Not Significant".
Construction of the Middle Creek Village is anticipated to commence in March 2OO2 and will last
for approximately 18 months, therefore any construction impacts will be temporary and of short
duration. All construction staging will be located on site and construction activities
predominantly will be confined to this site.
Contractors will be required to obtain the necessary permits and comply with all relevant town,
state and federal regulations regarding construction and safety. Potential construction impacts
are described below.
Noise
No noise-sensitive land uses are located on adjacent property. Construction hours and
noise levels will comply with the Town of Vail policies.
Disruption of Utilities
It is anticipated that there will be no disruption of utilities, and therefore no significant
impact with this activity. Construction of all utilities to serve the site will be contained
within the proposed site.
Disposal of Debris and Spoil
2850-001 Environmental I mpact Report
Middle Creek Village
Vail, Colorado
I
I
I
I
I
I
T
I Stewaft Environmental Consultants. lnc.
Page 9 of 14
I
tO
t
t
I
t
I
I
I
t
Demolition of two buildings is required as previously referenced. All construction debris
will be disposed at an approved landfill and transported on designated truck routes. The
general contractor will be responsible for on-site cleanup and disposal of debris.
Soilfillmay be required to elevate buildings abovethe 10O-yearflood plain. Disposalof
soil is not required.
Water Qualitv and Runoff
Project construction will not impact existing water quality. The general contractor will
comply with water quality requirements for site construction to meet state water quality
regulations. Best Management Practices (BMPs) will be implemented during
construction including the use of erosion control measures.
Access and Disruption of Traffic
City streets will not have any significant impact since the site is located directly off the l-
70 North Frontage Road. Any frontage road diversions will be addressed with a detour
plan.
Air Qualitv and Dust Control
Standard construction practices and BMPs will be used to control and minimize onsite
dust and emissions.
Safetv and Securitv
Standard construction safety measures will be observed on site. Town of Vail police will
ensure security.
Disruption of Businesses
No businesses are located in the immediate vicinity of the project area.
L. Aesthetics
The impact is "Generally Not Significant'.
The height, mass, and materials that will be used in the proposed MiddleCreek Village will
convey a sense of permanence and contextual and regional appropriateness. In addition, the
facility design will promote an orderly circulation and efficient integration of buses, other
vehicles, and pedestrians.
M. Communitv Disruption
The impact is "Generally Not Significant'.
No businesses or residential sectors will be disrupted or displaced, and no segments of the
community will be isolated as a result of this proposed project.
2850-001 Environmental lmpact Report
Middle Creek Village
Vail, Colorado
I
I
I
I
I
I
t
I Stewaft Envircnmental Consultants. lnc.
Page 10 of 14
I
N. Secondarv Development
I The impact is "Generaily Not Significant,'.
- The proposed project will not generate secondary development. The project is an outcome of
I the community's determination to provide affordable housing for people already employed inr Vail and are presently living in or near the community. The proposed housing project indirecfly
addresses the cause of traffic-related problems.
T O. AGENCIES AND PERSONS CONSULTED
I Agencies and Personnel
I
I ) Colorado Natural Heritage Program at Colorado State University- Beth Van Dusen
It
I References UsedI
1. colorado Natural Heritage Program, conseruation status Handbook Volume 3, No.
2, May 1999.
2. Fish and Wldlife Service, US Department of the Interior, National List of Plant
I Species That Occur in Wetlands: lntermountain (Region 8), Biological Report 88,
I May 1988.
- 3. Mitsch, WJ & Gosselink, JG, Wetlands, Van Nostrand Reinhold, 2nd Ed, 1993.rr 4. Kittel, G., E. Van We, M. Damm, R. Rondeau, S. Ketiler, A. McMullen, and J.
- Sanderson. 1999c. A Classification of Ripaian Wettand Plant Associations of
I Colorado: User Guide to the Classification Project Colorado Natural Heritager Program, Colorado State University, Fort Collins, Cb 90523
t vil. SUMMAEY
I Odell Architects, PC retained Stewart Environmental to perform an Environmental lmpactI Assessment of the proposed Middle Creek Village development located in Vail, Colorado.
Based on the findings contained in this report, the following conclusions have been drawn andI opinions and recommendations made:
I
I 28so{01 Environmental lmpact Report
Middle Creek Village
Vail. Colorado
I Sr;waft Environmental Consultants, lnc.
Page 11 of 14
I
b
I
t
I
T
I
I
Ip
Findinqs, Conclusions. Opinions and Recommendations
The proposed Middle Creek Village development is located adjacent to the Mountain
Bell facility, directly north across Interstate 70 from Vail Village. The proposed project
consists of multi-family housing constructed on a 6.5-acre site owned by the Town of
Vail. The project will not promote secondary development. The purpose of the project is
to provide affordable housing for people currently employed in Vail who are presenfly
living in or near the community. The project owner is coughlin and company, 140 East
19"' Ave., Suite 700, Denver Colorado 80203-103S.
A majority of the subject site is presently zoned 'NAPD" (Natural Area Preservation
District), and a small portion of the site where two early learning centers are located is
zoned G. The proposed project will require rezoning to the designation "H' (Housing).
Environmental issues regarding the proposed project are addressed in reports provided
under separate cover. These include a) geologic hazards - RJ lrish, Consulting
Engineering Geologist, lnc., b) drainage issues- Peak Land Consultants, Inc., c) soils -
Koechlein Engineering, and d) traffic - TDA of Colorado.
wetland issues were identifled and are addressed within this report. Montane
Environmental Solutions of vail, Colorado is presenfly performing an in-depth
investigation of the wetland issues. A letter regarding the status of their investigation is
provided under separate cover.
Wildlife uses the site; large mammals including deer and elk browse on the Serviceberry
and Current located in the Mixed Mountain Shrubland Community. Other mammals
including Black Bear, Coyote, Fox, Rabbits, Chipmunks, Golden-manile Ground
Squirrels, Pocket Gophers, and other rodent species likely feed and/or inhabit the site.
Reptiles, such as species of Garter Snakes also likely inhabit the site. No major wildlife
migratory routes appear to be located on site. Although Middle Creek is located off site
directly west of the property's western boundary, the creek is not likely used as a
migratory corridor. InterstateTO and development adjoining the south side of l-70
preclude use of the coridor for migratory use. Middle Creek is contained within a culvert
from the north side of l-70 to its confluence with Gore Creek south of l-70.
No known threatened or endangered species of plants or animals have been identifled at
the site. However, no on-site surveys for such species are known to have been
performed. The Colorado Natural Heritage Program's Conservation Status Handbook
(/999) lists the status of various animals, plants and plant communities found in Eagle
County. A copy of the Eagle County list is provided in Appendix A.
We recommend having the Colorado Natural Heritage Program perform a GIS
"Environmental Review" of the subject site and adjacent area. The review searches
known ecological information regarding the status of plants, plant communities and
animals within a specified radius of the subject property. The review will report the
status of these communities.
The proposed Middle Creek Mllage will impact plant and animal communities inhabiting
the property. Site development including earth moving activities and building/parking lot
2850-001 Environmental I mpact Report
Middle Creek Village
Vail, Colorado
1.
2.
2
4.
6.
I
I
I
I
I
I
7.
I
I Stewart Envi ronmental Consultants, I nc.
Page 12 ot 14
I
lO
I
T
t
I
I
I
Tp
6.
construction will strip a majority of the existing native and non-native vegetation,
including noxious weeds, and displace wildlife from the approximate 6.5-acre site.
However, existing vegetation and wildlife are not site specific. surrounding property to
the north, east and west contain vast square miles of similar plant communities, wilOtfe
habitat and wildlife species. The loss of these 6.5 acres does not represent a significant
impact to the plant and animal communities. Displaced wildlife will find and inhabit
nearby similar habitat.
The presence of Middle creek Village will have impacts on use of adjacent property by
wildlife, particularly large mammals. Increased human presence and reflected light ;nay
influence adjoining habitat use. Adjoining property is private so that residenti of thb
Village should not be using adjoining properties. Human/bear interaction is possible. All
trash dumpsters will need to be covered and othenivise made bear proof. Lighting
designed to reduce reflected light and conform to the Town of Vail building coOe witt Oe
incorporated into the site design.
lmpact to Middle Creek from surface runoff will be minimized. Potential impacts include
grease/oil runoff from paved parking areas and sand/gravel runoff from winter sanding of
roads. The location of accumulated snow piles resulting from plowing will be addressld.
The piles will be located such that snowmelt containing grease, oil, silt, sand, and gravel
do not impact Middle and Gore Creeks. Any such contaminants discharged to MiOdle
lreek may impair water quality of the creek and potentially impact the fisheries of both
Middle and Gore creeks. Engineered drainage swales, berms, dikes, elc. will be
incorporated into the project design to prevent impact to Middle Creek. Construction will
be in accordance with all applicable local, state, and federal regulations and standards.
lf dewatering is required during construction, water will be retained on site.
10.A parking facility is proposed at a location just east of the Mountain Bell structure.
Middle Creek lies north and west of this area. lmpacts to the riparian corridor and
wildlife using the corridor adjacent to Middle Creek will to be minimized. This can be
accomplished by constructing the parking area as far as possible from Middle Creek.
Drainage issues as previously referenced are also a concern in this area of the site.
Eng.ineered drainage swales, berms, dikes, etc. will be incorporated into the project
design to prevent impact to Middle Creek.
11. Two displacements will result from implementation of the proposed project. The ABC
and the Learning Tree early childhood learning centers will be displaced. The existing
buildings will be demolished and new facilities will be constructed at the southeastern
portion of the site.
State regulations require a full National Emissions Standards for Hazardous Air
Pollutants (NESHAP) asbestos inspection of the buildings priorto demolition. lf the
inspection identifies asbestos-containing materials, mitigation (abatemenUremoval) per
regulations will be performed prior to demolition of the buildings.
o
T
I
I
I
T
t
Stewaft Environmental Consultants, tnc.
Page 13 of 14I
I
2850-001 Environmental lmpact Report
Middle Creek Village
Vail, Colorado
I
b
I
I
I
t
I
t
Ip
VIII. ASSESSOR QUALIFICATIONS
Stewart Environmental has performed environmental consulting services for more than 2,800
different clients since 1980. With a staff of 25 professional engineers, scientists, and
technicians, Stewart Environmental is qualified to perform environmental impact assessments.
The following is a list of key Stewart Environmental personnel and their responsibilities on this
project:
D Richard G. Patterson, PE - Project Administrator
) Robert J. Blinderman, REPA -- Environmental Scientist
Mr. Patterson (registered professional engineer) provided overall project administration and
project review. Mr. Blinderman (M.S. Natural Sciences, M.S. Industrial Science, registered
environmental property assessor, and certified asbestos inspector) performed the records
review, site reconnaissance, interviews, local governmental official contacts, and prepared the
report of the findings of the environmental impact assessment. Mr. Patterson reviewed the final
assessment report.
This report was:
Prepared by:Under the direction of:
I
I
I
I
t
I
Environmental Scientist
Stewaft Envircnmental Consultants. Inc.
Page 14 of 14
to
T
I
2850-001 Environmental I mpact Report
Middle Creek Village
Vail, Colorado
Figures
I
b
I
T
I
I
t
T
t
to
I
I
I
I
I
I
to
T
I Stewaft Envircnmental Consultants. lnc.
ffiruruffi %vntffiaffi(ru
tiil"NIW
rci'/ ! .i:'//,/,/ t l{ | t. ',/,2|tthi://ill \,','
:..--r/..)//j/; '. \
/.'/./t'l ( , \(r-i:t\it=)
\---ri'-__--.1'--.''-:l\':-:----'l
#I+$
w
KN^.:'j.-
-'i'r \' /
i,ri0i
\il:
"l'-)==-H
'€.-;'--.:';1--',
*-R
t.'i.::-Nii -:w ti;.-l'[$?))iJl,:==r.24/, 1,4
tr#
:1.-'r.nlT*.Zr\->:;-l-:
.;jr-l:11!=-
EF:H$;
ofs Go
:ffi
3.1=g"itrE$=.9:-,ti\-: -'-- -' '.1!|
(.r,'
a'.'.,
i:,zt;5:';a$-r2=.;
'ari+
,Ms_-i*f't:{i'ffi
(i(,$_\^le.*.F
SOURCES:
VAIL VIEST, @LO.VAIL EAST COLO.
N
I*#t
I
S
I MTV/4 MINTURN lY QIIADRANGI-E
39tOGF4-TF424
1970
Pholo revised 1987
NTM4 MINTURN 15" OT,ADRANGLE
39'10&FITF{24
'| 970
Pholorev is€d 1987
o 1t2 1 MILE
SCALE 1 ,.24,N0
OMA 4763 lll NW- Serirs V877 OMA 4763 t NE - Serbs VBTZ CONTOUR INTERVAL 1O FEET
I V, srEtvAf,r E {yf RoililErrrlAt
^d S.9IlYlt#P;"'J.t; scien,ds
2850-OO1 Mdde Creek Village
Vail.Cdqah
FIGURE
LOCATION
I
MAPAugust 2001
I
t
I
t
T
I
I
t
I
I
I
I
I
T
I
T
(D o.
HS
BH|r.q,
U
5assto!flJgo
6o-urJ
ds
=
I
E
anz
t
o
I:O!rr)
!Rir
ooo
C\|
t--a
()f,
7
OA2Ei- L!a2
>< trl
trJ (J
\y/
lr
ull t
2it
*'\\,
ir
""-\
*t.:1
\\.-a\
V,,.,
\ ,,HO
"..
tE
3\\'-gi\ .-r r'rr
\l*)l
=\(
'.-=
3E2Eut !?
=.:z() 293;.
=ut ffi5l- =
FE 2trJ tr<) ==(,l 5
F6]2(l'()u
X
Z-q-*--
J--IIIIIIr t- r r r r r rg
{ gg; ao s;+ 6ol
+€.93"tr.-ED(l,=€=sqf E ,I
q)
o
a
co'=
ooo
Q)
E((ta
aq)
=c't
oo.J
o
$
C
(U
Cq)
aor
;
-Co)-
(U
C('
_o
f
ca
co
aao
( r')
oc
(U
c
ro
(D
,X
o)
-_a
q)c
E
E
c
(D
aoo
0)
-C
aao
o
C'c
loa
C
-)Z
J
c)=a
(D
_a
-)<o
(D
O
o)
p
Doao
o
-
oc
(U
f.-_l
aa
(o
.c.tsoC
,El<
-l
r..
IIIIIITIoIIIIIIIII
a+g$;E;6+ b$l
ass8":r!CDo=€=sqf = E
-:<
c)o
O
0)co
=Foc)
o-
i/N'"4o_
', c:o,YO(U (r)3;
ts rn
E <t)lloa
o)
,C
o
I
-Y :l:1
oo(Jn
oro
Ec>o(l)c
*5oot)i>
3€c) (u'Sc
-_l<OO
Eq96
-:---J l_L
G
aaooJo:o r/)
q)o
5 o.ro)oc*
i< d\
;6XraYrfORnrY
=5OC
>6pO
(Uo
Bq)e*
AYc)E>ct'z
Cv
:
(u
c)m
c
Gcf
(s
Oc
-)<o(D
o
=o.:
UI
o
B
.a)
E({t
0)
a
l
oIIIIoII IIoIIIIIIIrIII
Appendix A
I
lt
I
t
I
T
I
I
T
to
I
t
I
T
I
Conservation Status Handbook, 1 ggg
Eagle County, Colorado
p. 147 - 149
to
II
t Stewaft Envinnmenta! Consultants, lnc.
t
I
I
I
t
I
I
I
YG5S5
YG5S4
s4
Y
Y
I
t
I
T
I
I
County: Eagle
A rnnhihianc
Scientific Name
Bufo boteos pop I
Birds
Scientific Name
Accipiter gentilis
Aegolius ltotreus
Arrrphispizn belli
Bucepluln islattlica
Cypseloidzs niger
F alco pere ginus anatunt
Grus cofi\,lens$ tabida
Fish
Scientific Name
Gila robusta
O ncorhy ncl u s cl arki pleuitians
Mammals
S.ientific Name
Culo grlo
Lyfi:t canadensis
P Ie c o tu s tot t' n se n di i pol le s c en s
Mussels and Snails
Scientific Name
Lyfinded stagnolig
Plant Communities
S<ientific Name
A B I E 5 LA S I OCARPA- P ICE A
ENCELM/4 NNITALNUS INCANA
AB I ES LA SIOCARP A.PICEA
EN C E LM A N N I IA4ERTENSIA CILTA IA
AB I E S LAS IOC A RP A. P I CE A
ENGEIMANNTIAALIX
DRUMMONDIANA
ALNUS INCANA-CORNUS SERICE,4
ALNUS INCA Ni4,ATESIC FORE
B ETU LA OCC I D EN T ALt SAIES|C F O RB
CARDAMINE
CORDIFOLIA.MERTENSIA
CAREX AQUATILIS
Common Name
boreal toad (Southern Rocky Mountain
population)
Common Name
Northern Goshawk
Boreal Owl
Sage Sparrow
Bar'low's Goldene)'e
BlackSwift
Amedcan Peregdne Falcon
Greater Sandhill Crane
Comrnon Name
roundtail chub
Colorado River cutthroat trout
Common Name
wolverine
lynx
Townsend's big-ealed bat subsp.
Common Name
swampy lymnaea
Common Name
Montane Ripalian Foaests
Montane Riparian Forests
Montane Riparian Forest
Thinlcaf Alder-Red-oiser Dogwood Riparian
Shrubland
Thinleaf Alder/Mesic Forb Riparian
Sfuubland
Foothills Ripaiian Shlubland
Alpine Wetlands
Montane Wet Meadows
CNHP Status and Ranking
Tracking Global Srate
Status Rank RankY G4T1Q 51
CNHP Status and Ranking
Tracking Global State
Status Rank Rankw c5 s3B,
PG5S2
P G5 S3B,
Y C5 S2B,
Regulatory 5tatus
Agency Federal State
Sensitive Status Statqs
It
Regulatory Status
Agency Federal State
Sensitive Statug Status
FS/BL
FS
G4 S3B
Y G5T4 S2B,
CNHP Status and Ranking
Tracking clobal State
Status Rank RankY G2G3 52
Y G4T3 53
CNHP Statua and Ranking
Tla.king Global Statestatus Rank RankYG4S1
YG5Sl
Y G4T4 52
CNHP Status and Ranking
Trackint Global State
Status Rank RankYG5S2
CNHP Status and Ranking
Tracking clobal StateStatus Rank RankYG555
Regulatory Status
Agency Federal State
Sensitive Statls StatusBLM SC
F5/BL SC
Regulatory StatuB
Agency Federal State
Sensitive Status StatusFSE
BLM
Regulatory Status
Agency Federal State
Sensitive 5tatu6 Status
Regulatory Statqg
Agency Federal State
Sensitive Statu6 Status
Y
Y
BLN,I
FS
FS
G3G4Q
G3
G4
I
I t47
I
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
T
I
I
T
t
I
I
I
t
I
I
t
I
C AREX SCO P U LO RU M-C ALT H A
LEPTOSEPALA
CAREX UTRICULATA
CORNUS SERICEA
DANTHONTA INTERMEDIA
DESCHAMPSIA
CESPITOSA-LICUSTICUM
EIEOCHAR/5 QUINQUEF LORA
/UNIPERUS
O ST EO S P E RM,AIA RT E MI SI A
/uNrPEnus scoPULo RU WCQRN US
sERlcE/q
PICEA PUN GEN S/A LNUS INCANA
PINUS EDULIS./UNlPERU5
O ST E O S P E RMA/ST I P A CO M AT A
POPULUS ANGUSTlF OLr A-lU N Ip ERLTS
SCOPULORUM
POPULI-IS ANGUSTI F O LI A.P ICE A
PUNGENS/AI,NUS JNC?ANA
POPULUS ANGUSTIF OLI A/ALN U S
INCANA
POPULUS ANGUS]]I OI IA/CORNLIS
SERICEN
POPUTUS ANGUSTT F O Lr A/S A Lt X
ERIOCEPHAU VAR.
L IC U LI F O LI A- SH EP H E RD I A
PO P U LUS T R EMU LO tD ES/ACER
CLABRUM
QU E RCU S G A MB E L] I. A MELAN CH I E R
U?4HEN5IS
SALIX
D RU MMON D I AN A/CAI}, MAGRO STI S
CANADENSIS
SALI X D RU MMOND IAN NMES IC FORB
S A LI X E XIC U A,/B A R€ GROUND
S A LI X MO N T I CO LA/CALAM A CRO ST] S
CANADENSIS
sALlx MoNTICOWCAREX
UTRICULATA
s A Lt x M o N T tco L,^/MES.iC FORB
S A LI X P I,AN 1 F O LI NCA LA MAGROSTI S
CANADENSlS
SALI X PIAN I FOLIUCALTHA
LEPTOSEPALA
s A L r x wo LF r I/cA RE X UTRTCULAT A
SHEPHERDIA ARCENTEA
Plants
Scientific Name
Botrychiut r lundAtl
Cwipediu fnscicrlatu,tt
Drnbi rectifructa
Erioplrorwt oltnicutn ou fieogdew
Glqmocarpium dryopteis
Lirfinolchis els{olio
Listcra borealis
Alpine Wetlands
Beaked Sedge Montane Wet lVleadows
Foohthills Riparian Shrubland
Montane Grasslands
Mesic Alpine Meadows
Alpine Wetlands
Xelic Westem Slope Pinyon-Juniper
Woodlands
Riparian Woodland
Montane Riparian Forests
Xedc Westem Slope Pinyon-Juniper
Woodlands
Montane Riparian Forest
Montane Riparian Forests
Montane Riparian Forest
Cottonwood Riparian Forest
Narrowleaf Cottonwood Ripa an Forests
Montane Ripalian Folests
Mixed Mountain Shrubland
Lower Montane Willow Carls
Drurnmonds Willow/ Mesic Forb
Coyote Willow/Bare Ground
Montane Willow Car!
Montane Riparian Willow Carr
Montane Riparian Willow Carr
Subalpine Riparian Willow Carr
Subalpine Ripalian Willow Carr
Subalpine Ripatian Willow Carr
Foothills Riparian Shubland
Comrnon Name
Common Moonwort
Purple l,ady's-Slipper
Mountain Whitlow-Glass
Altai Cottongrass
Oak Fem
Canyon Bog€rchid
Northem Twayblade
YG4S3
Y G3G4 51
CNHP Statue and Ranking
Tracking Global State
Status Rank Rank
Y Gs S2S3
YG4S3
Y G3? 32
Y G4T? 53
Y G5 S2S3
Y G4G5T3? 53
YG4S2
Regulatory Statu5
Agency Federal State
Sensitive Status Status
FS
FS
BLM
Y
Y
S2
s4
G4
G3
GU
G4
YC4
YG4
YGU
YCU
Y G.I
G4 54
G3 53
c3 s3
G4 54
54
s4
s3
s3g
SU
s3s,l
SU
52
53
SU
G2G3
G4
G3
SU
I
I 148
GsTt,.I SU
G5TU SU
G3G4 S3S4
G3 53 FS/BL
Y
Y
Y
Y
Lycopodiutr nnnotinnt oar punget$
Lycopodiurn dubiunr
Penste pn cyatwtorus
P e nste uon luft itrgt o ni i
P\atnntlvro sparstlord oar ensifolin
Stiff Clubmoss
Stiff Clubmoss
Middle Park Penstemon
Harrington Beardtongue
Canyon Bog-Orchid
t
to
I
I
t
I
T
I
Ip
I
I
I
I
I
t
to
I
I 149
1 M@NTANE
ENVIRONMENTAL SOLUTIONS" Ltd.
Otis Odell
Odell Architects
32o65 Castle Ct, Suite r5o
Evergreen, CO 8o+gg
August 24,2oor
Dear Mr. Odell,
At you request Montane Environmental Solutions Ltd (Montane) visited the
proposed affordable housing development located at the'Mountain Bell site', on
August 23rd, 2oo1. The purpose of the visit was to review an area identified in the
draft Environmental Impact Report (EIR) as a narrowleaf cottonwood
community with a potential for containing wetlands.
It was our finding that although not extensive, there were some areas of the
woodland that did have the potential for being wetlands. To identify wetland
areas areas, we propose to conduct a jurisdictional wetlands delineation in a
format acceptable to the US Army Corps of Engineers (Corps).
From our visit yesterday it appeared thatjurisdictional wetland areas (areas
under the jurisdiction of the US Army Corps of Engineers) are probably rather
limited and would therefore be likely to fall into the 'Nationwide Permit' category
of federal permitting. The Nationwide Permit system is a streamlined permit
system for small impacts, not considered to be of significant environmental
impact.
Do not hesitate to call if you have any more questions. We look forward. to
working with you further on this project
Sincerely
Nicola Rlplev
P.O. BOIE Co+?[ce,3llc, GO&ORADO a!,C31IFHOUIEIF$'X GATOI 3eA-
6 lBA0PllOrlEtFA.:E tO"Ot 16A-0+50
It-b.ry
G-GtC..fdc
Koechlein Consulting Engineers, Inc.
Consulting Geotechnical Engineers
12364 W. Alameda Pkrvy. Suite 115. Lakewood, CO 80228-2845
LAKEWOOD
(303) 989-1223
(303) e8s-0204 FAX
August 23,2001
Odell Architects, P.C.
32065 Castle Court, Suite 150
Evergreen, CO 80439
Subject: Preliminary Geotechnical Investigation and Geologic Hazard Studies
Proposed Development - 6.5 Acres
Middle Creek Village at Vail
Vail, Colorado
Job No. 01-136
As requested we have performed a preliminary geotechnical investigation and geologic hazard study for
the subject propefiy. The purpose of this letter is to present our general conclusions regarding the
preliminary geotechnical investigation and geologic hazards.
We anticipate that the subsurface conditions throughout the development will consist of granular alluvial
soils. These soils should safely support spread footing foundations and slab-on-grade floors for the
proposed structures. Excavation of these soils will require heary-duty construction equipment. It is our
opinion, that development of this site will require typical mountain construction techniques.
Based on current and previous geologic hazard studies, the subject site is within a rock fall hazard and a
debris flow hazard. Fortunately, both of these geologic hazards can be successfully rnitigated. For
additional information regarding preliminary geotechnical recommendations and geologic hazards refer
to our Preliminary Geoteclmical Investigation and Geologic Hazard Studies report, dated August 23,
2001.
We appreciate the opportunity to provide this service. If we can be of further assistance, please contact
our office.
KOECHLEIN CONSULTING ENGINEERS, INC.frtr'
Scott B. Myers, P.E.
Proj ect Engineer
(8 copies sent)
AVON
(970) 949-6009
(970) 949-9223 FAX
SILVERTHORNE
(970) 468-6933
(970) 468-6939 FAX
Io
KOECHLEIN CONSULTING ENGINEERS, INC.
CONSALTING GEOTECHNICAL AND MATERIALS ENGINEERS
PRELIMINARY GEOTECHNICAL INVESTIGATION
AND
GEOLOGIC HAZARD STUDIES .
PROPOSED DEVELOPMENT_ 6.5 ACRE
MIDDLE CREEK VILLAGE AT VAIL
VAIL. COLORADO
Prepared for:
Odell Architects, P.C.
32065 Castle Court, Suite 150
Evergreen, CO 80439
I
I
I
I
I
I
I
t
I
I
t
T
I
Io
l.Job No. 01-136 August 23,2001
t
I
DENVER: 12364 llest Alanteda Prh*y,, Suite IIS, Lakewood, CO, E0Z2g (303) gSg-122i
AVON: (970) 949-6009
SILVERTHORNE: (9ZD 46a-6933
ti.o"o'$!'n1,#"4W
ggSae !-
f/;#,,$
TABLE OF CONTENTS
SCOPE
EXECUTIVE SUMMARY
SITE CONDITIONS
PROPOSED DEVELOPMENT
GEOLOGIC HAZARD STUDIES
INVESTIGATION
SUBSURFACE CONDITIONS
GROLND WATER
CONDITIONS INFLUENCING PROPOSED DEVELOPMENT
FOUNDATIONS
FLOORS
UTILITY CONSTRUCTION
SITE WORK
General
Cut Slopes
Eiu
Retaining Walls
SITE DRAINAGE
PRELIMINARY PAVEMENT DESIGN
FURTHER INVESTIGATION
LIMITATIONS
VICINITY MAP
SITE PLAN
CURRENT GEOLOGIC HAZARD STUDY
PREVIOUS GEOLOGIC HAZARD STUDIES
KOECHLEIN CONS ALTING ENGINEERS, INC.Consulting Geotechnical Engineers
Fig. I
Fio ?
Appendix A
Appendix B
August 23, 2001
Job No.0l-136
I
I
J
4
5
5
6
6
7
8
9
9
l0
10
l0
ll
ll
t2
LZ
l3
14
l5
l5
I
t
I
I
I
I
I
lo
lo
T
t
I
I
I
t
-o
I
I
t August 23, 2001
Job No. 0l - 136
KOECHLEIN CONSULTING ENGINEERS, INC,
Co nsul titrg G eote c h n ic al E n gin e erslo
I
I
I
I
I
I
I
SCOPE
This report presents the results of a preliminary geotechnical investigation for the
proposed commercial development of 6.5 acres located in the Mountain Bell Site in Vail,
colorado. The approximate site location is shown on the vicinity Map, Fig. l. The
purpose of the investigation was to evaluate the subsurface conditions at the site and to
provide preliminary geotechnical recommendations for the proposed development.
This report includes descriptions of anticipated subsurface soil and ground water
conditions based on adjacent properties and our experience with similar projects, the
geotechnical conditions influencing the proposed development and recommendations for
development of the site. This report presents anticipated subsurface conditions tbr the
proposed development. Site speciJic geoteclmical investigations should be performed for
individual building sites and pavement subgrade, as recommended in this report.
A summary of our investigation findings and conclusions is presented in the
following section.
EXECUTIVE SUMMARY
l. Based on adjacent properties and our site reconnaissance, we anticipate
that the subsurface conditions will consist of either topsoil or existing fill
underlain by alluvial soils. The alluvial soils should be characterized by
medium dense to dense, sand and gravel with cobbles and boulders. we
anticipate that the existing fill will be characterized by a loose to medium
dense, sand and gravel with cobbles.
lo
I
t
I
t
I
I
l.
I
I
I
lo
August 23, 2001
Job No.0l-136
7.
8.
KOE CHLEI N CO NS A LTI NG ENG I NE ERS, I NC.
Co nsulting Ge o le c h nical E n gin e ers
Because Middle creek appears to have been rechanneled to its current
Iocation, it is possible that ground water could be encountered in isolated
underground channels throughout the proposed development. Refer to the
GROUND WATER section of this report for additional details.
Two buildings with associated amenities and utilities are currently located
on the subject site. All existing foundations, slabs-on-grade, utilities and
associated filI should be removed to expose the natural soils prior to
construction of the proposed development.
Based on our site reconnaissance, we anticipate that existing frll will be
encountered during construction of the subject project. we believe that
the existing fill will be characterized by sand and gravel with cobbles and
boulders. In our opinion, the existing fill, free of deleterious material, may
be used as structural fill for the development ofthe project.
In our opinion, the proposed buildings within the development may be
supported by spread footing foundation systems bearing on the natural
sand and gravel soils. However, because these soils are alluvial soils,
differential settlements are possible. Refer to the FOUNDATION section
of this report for more infonnation.
In our opinion, the natural sand and gravel anticipated throughout the
development will support slab-on-grade floors. Refer to the FLOORS
section of this report for more information.
cuts up to l0 feet in height may be necessary along the access road to the
proposed parking structure. Large cut slopes, greater than l0 feet, will
need to be evaluated by a Professional Geotechnical Engineer. Refer to
the EXCAVATION section of this report for additional cut slope
recommendations.
Retaining walls and fills may need to be constructed along the proposed
southem parking lots. Refer to the SITE woRK section of this renort for
additional details.
utilities will be installed for the proposed development. Because cobbles
and boulders are anticipated throughout the development, it is our opinion
that heavy-duty excavation equipment will be required to complete
excavations within the proposed development.
2.
J.
4.
5.
t
I
t
I
I
I
T
6.
9.
I
T
I
I
I
I
lo
l.
I
I
to
I
I
I
I
I
I
I
lo
t
I
I
T
t
I
I August 23,2001
Job No. 0l - | 36
K OE CH LEI N CONS ALTI NG ENG I NE ERS, INC.Consulting Geotechnical Engineers
10. we anticipate that paved roads are to be constructed for the proposed
development. The paved roads may include both rigid and flixible
pavements. Preliminary pavement recommendations based on anticipated
subsurface conditions are presented in the pAVEMENT DESIGN section
ofthis report.
SITE CONDITIONS
The proposed development is to be located on 6.5 acres in the Mountain Bell Site
in Vail, Colorado. The site is bordered by the North Frontage Road West to the south and
partially by Mountain Bell Road to the north. The Mountain Bell Tower borders the site
to the west while open space will border the site to the east. The subject site is shown on
the Site Plan, Fig. 2. Two existing buildings with associated arnenities and utilities are
located on the subject site. The buildings are single-story buildings and are of wood
frame construction. Because of the previous developrnent on the site, existing fill was
observed tkoughout the proposed developrnent in the area of the existing buildings.
Existing fill was not observed in the area south of Mountain Bell Road. The topography
of the site consists of moderate slopes of 5 to 10 percent to steep slopes of 15 to 20
percent. The overall drainage ofthe site is generally to the south. Vegetation on the site
consists of grasses, bushes, trees and aspen trees.
l.
t
I
lo
I
I
I
I
I
I
I
Io
t
I
I
I
I
I
I August 23,2001
Job No. 0l- l 36
KOECIILEIN CONS IlLTING ENGINEERS, INC.
Cons ul ting G e otech n lcal E ngin ee rs
PROPOSED DEVELOPMENT
The project consists of the development of 6.5 acres in the Mountain Bell Site in
vail, colorado. A preliminary site plan for the proposed deveropment was provided by
the Architect prior to our investigation. The preliminary development plan is shown on
the Site Plan, Fig. 2. we understand that the proposed deveropment may consist of
townhouse type, multi-family, commercial buildings with associated access drives and
parking lots. The buildings will be constructed south and southeast of Mountain Bell
Road. Parking areas for the proposed buildings will be constructed to the south of the
buildings and to the north of the proposed buildings. We understand that the parking area
constructed to the north of the buildings may consist of a twolevel parking structure with
the top level being at grade. we understand that the multi-family buildings will vary
from 2 to 4 stories in height and will be stepped to match the existing ground surface. By
stepping the proposed structures with the existing ground surface, we anticipate that
maximum excavations of only i0 feet in depth may be required. we anticipate that
pennanent cuts and fills will be required for construction of the proposed development.
Maximum wall loads were assumed to be those normally associated with multi-family
commercial construction.
l.
I
t
lo
t
I
I
I
t
t
I
lo
I
I
I
I
T
I
I
I
I
l August 23, 2001
Job No. 0l - 136
KOECH LE I N CO NS U LTI NG ENGIN EE RS, I N C.
Co nsulti ng G eot echtrical E n gin e ers
GEOLOGIC HAZARD STUDIES
A current geologic hazard study was perfonned for the proposed development in
order to identify any geologic hazard that may exist on the subject site. The Geologic
Hazard study was prepared in August of 2001 by R. J. Irish Engineering Geologist and is
presented in Appendix A.
In addition to the geologichazard, study prepared by R. J. Irish, previous geologic
hazard studies for the area have been prepared. Three previously prepared geologic
hazard studies or summaries are presented in Appendix B.
INVESTIGATION
Because of the existing buildings, shrubs and trees on the subject site, access to
the site with excavation or drilling equipment is extremely difficult. In order to obtain
access to the site, an access road must be constructed through the proposed development.
Because of the inaccessibility of the site, exploratory test pits orborings were unable to
be excavated or drilled on the subject site. In order to obtain a general idea of the
subsurface conditions throughout the subject site, an engineer from our office
reconnoitered the site on August 14, 2001, The engineer observed the subsurface
conditions exposed within cut slopes throughout the proposed development and observed
the soils on the exposed ground surface. The subsurface conditions observed during our
field reconnaissance were compared to subsurface conditions encountered durins our
o
I
to
I
I
I
I
I
I
I
to
t
I
I
I
I
t
l.
I
I
August 23, 2001
Job No. 01- 136
investigations of nearby sites. The anticipated subsurface conditions presented in this
report are based on our site reconnaissance, information from nearby soil investigations
and our experience with similar locations within the Vail area. When access to the site
lns been constructed, we recommend tlwt a site specific investigation be performed. we
recontmend that site speci,fic geotechnical investigations be performed for each btdtding
at tlte tinte the buildings are being designed. In additiott, we recommend thar a Jinal
subgrade and pavement investigation be performed for the proposed access roacls and
parking areas. lf requested, we can perfonn the additional investigations.
SUBSURFACE CONDITIONS
Based on our experience with nearby projects and our site reconnaissance. we
anticipate that the subsurface conditions will consist of either topsoil or existing fill
underlain by alluvial soils. The alluvial soils should be characterized by medium dense to
dense, sand and gravel with cobbles and boulders, We anticipate that the existing fill will
be characterized by a loose to rnediurn dense, sand and gravel with cobbles.
GROUND WATER
Because Middle Creek appears to have been rechanneled to its current location, it
is possible that ground water could be encountered in isolated underground channels
throughout the proposed development. Howcver, ground water encountered durins the
KOECHLE IN CONS ULTI NG E N G I N E ERS. INC.Consulting Geotechnical Engineers
I August 23, 2001
Job No. 0l - 136
KOECH L E I N CONS I]LTI NG E NG I NEE R S, INC.Consulting Geotechnical Engineerslo
T
I
I
T
t
I
I
lo
t
I
I
I
t
I
development of the project can generally be
trenching techniques. Therefore, we do not
affect the proposed development.
controlled by using standard excavation and
anticipate that ground water will adverselv
CONDITIONS INFLUENCING PROPOSED DEVELOPMENT
Construction of the development will require excavation of the near surface soils.
We anticipate that these soils will consist of the medium dense to dense, sand and gravel
with cobbles and boulders. Because cobbles and boulders are anticipated, it is our
opinion that heavy duty construction equipment will be required to comprete the
necessary excavations.
Due to inaccessibility of the site at this time, exploratory test pits or borings were
not excavated or drilled in the proposed development, The anticipated subsurface
conditions presented in this report are based on our site reconnaissance, information from
nearby soil investigations and our experience with similar locations within the Vail area.
lllhen access to the site has been constt'ucted, v)e recontntend that a site speci,fic
investigation be perfornted. We recontntend that site specific geotechnical investigations
be performed for each building at the time the buildings are being designed. In acldition,
we recotnmend that a Jinal subgrade and pavement investigatiol be performed for the
proposed access roads and parking areas. If requested, we can perform the additional
investiqations.l.
I
I
lo
I
I
I
I
I
I
l
lo
t
t
I
I
I
I
I August 23, 2001
Job No. 0l- 136
KOECH LE I N CONS ULTING E N G I NE ERS, IN C,
Consu lt ing G eot e c h nica I E n gin eers
FOUNDATIONS
We anticipate that the materials at potential foundation elevations will consist of
either existing fill or sand and gravel with cobbles and boulders. In our opinion, the
existing fill will not safely support fbundations for structures within the proposed
development' Therefore, all existing foundations and associated filI must be removed
from the proposed development prior to construction.
We believe that the anticipated sand and gravel r.vill safely support spread footings
for the proposed buildings within the development. However, because the anticipated
natural soils are alluvial soils it is possible that loose, silty sancl pockets or layers could
be encountered beneath the proposed development. Foundations constructed on these
types of soils can experience large differential settlements. Provided that no loose sand
pockets or layers are encountered beneath the proposed foundations, it is our opinion that
the anticipated sand and gravel will safely support spread footings for the proposed
buildings within the development. We anticipate that spread footing foundation systems
for the buildings within the proposed development may be designed with a maximum
allowable bearing pressure varying from 2,500 psf to 6,000 psf. The allowable bearing
pressure will depend on the amount of cobbles and boulders within the building envelope.
The maximum allowable bearing pressure can be better defined during the site specific
investigations.
l.
I
I
lo
I
I
I
I
I
t
I
lo
I
I
I
I
t
I
I August 23, 2001
Job No. 0l - 136
KOE CH LEI N CO NS ALTI NG ENG I N EERS, I N C,
Co nsu Iti ttg G eotech rri ca ! Engi n ee rs
FLOORS
The materials at the potential floor slab elevations may consist of topsoil, existing
fill or sand and gravel. In our opinion, the existing fill or topsoil will not safely support
slab-on-grade floors. However, the natural sand and gravel will safely support slab-on-
grade floors with a low risk of movement. The presence of loose, silty sand pockets or
layers will have less of an impact on slab-on-grade floors. However, if these pockets or
layers are encountered, they should be removed and replaced with properly moisture
conditioned and comoacted fill.
UTILITY CONSTRUCTION
Construction of utilities below grade will require the excavation of the near
surface soils, We anticipate these soils will consist of topsoil or existing fill underlain by
sand and gravel with cobbles and boulders. Because cobbles and boulders are
anticipated, it is our opinion that heavy-duty construction equipment will be required to
complete the necessary excavations for utilities. Sand and gravel soils without ground
water classify as Type B soils in accordance with OSHA regulations. OSHA regulations
should be followed in any excavation.
l.
t
I
lo
I
I
t
t
I
I
t
Io
t
I
I
I
t
t
T August 23, 200 |
Job No. 0l - 136
SITE WORK
General
KOE CHLEI N CO NS ALTING ENG I N E E RS. I N C.Consulting Geotechnical Engineers
construction of buildings and access roads may require cuts and fills to
obtain the desired grades. Any cut or fill slopes greater than l0 feet in height should
be evaluated by a Professional Geotechnical Engineer. Retaining wall systems may
be required in some areas to reduce the extent of cuts and fills. we anticipate that
on-site sand and gravel may be used in fill areas. proper moisture treating of the
natural soils will be required prior to or during placement and compaction of fill.
surface drainage should be carefully evaluated during design and
construction of the proposed development, Slopes around retaining walls and
buildings should be graded so that positive drainage is maintained away from these
structures.
Cut Slopes
Any cuts, which are greater than 10 feet in height, shourd be evaluated on an
individual basis. If requested, we can perform the evaluation of these slopes. In
general, slopes of2:l (horizontal to vertical) up to l0 feet in height should be stable
on the subject site, if properly drained. Surface drainage should be carefully
designed to divert surface water away from the slopes. All cut slopes should be
vegetated as soon as possible after construction.I.
I
I l0
to
I
I
I
t
I
I
I
Io
I
I
I
I
I
I
t August 23, 2001
Job No. 0l- 13 6
KOECH LE I N CO NS U LTI NG ENGINEERS. I NC,
Cotrsulting Geotechnical Englneers
Eill
Fills over l0 feet may be required for this developrnent. Any filr slope
greater than l0 feet in height should be evaluated on an individual basis. If
requested, we can perform the evaluation of these slopes. In general, filI slopes of
2:l (horizontal to verticai) up to l0 feet in height should be stable, if properly
drained. Fill may consist of anticipated on-site sand and gravel free of deleterious
materials or an approved imported granular fill. No cobbles or boulders larger than
12 inches should be placed in fill areas. Fill areas should be stripped of all
vegetation, topsoil, existing foundations and existing fill. The resulting surface
should be scarified and properly moisturc conditioned and compacted. Fill should be
placed in thin loose lifts, moisture conditioned to within 2 percent of optimum
moisture content and compacted. The degree of compaction will vary depending on
the use of the fill.
Retaining Walls
Retaining walls may be needed to reduce the magnitude of cuts or fills for
development of this site. The types of walls that are possible on this site are
conventional concrete retaining walls, MSE (mechanically stabilized earth) wails,
timber crib walls and boulder retaining walls. The retaining walls need to belr
I
I ll
to
I
I
I
I
T
T
T
to
I
I
I
I
I
t
I August 23, 2001
Job No. 0l- 136
KOECHLE I N CONS U LTI NG E NG INEERS, I N C,Consultittg G eote c hnical Engin eers
designed to resist laterai earth pressures. Lateral earth pressures depend on the type
of backfill, slope of ground surface behind the retaining wall, height of retaining
wall, and type of retaining wall. we can provide the design, or the geotechnical
design criteria, for the retaining walls once the specific site conditions and proposed
construction are finalized.
SITE DRAINAGE
Surface drainage should be carefully evaluated during design and construction of
the development. overall drainage of the site is generally down to the south.
Construction areas should be carefully sloped to reduce the possibility of infiltration of
surface water into the cut and fill slopes. In addition, slopes around retaining walls and
buildings should be graded so that positive drainage is maintained away frorn these
structures at all times. The surface drainage of the development should be evaluated prior
to establishing final grades.
PRELIMINARY PAVEMENT DESIGN
It is anticipated that the roads and parking areas within the development will be
paved' Based on the subsurface conditions, it is our opinion that flexible asphalt and
rigid concrete pavements are possible. It has been generally found that concrete
pavements tend to perform better than an asphalt and base course pavement. The initiallo
I
I t2
I August 23,2001
Job No. 0l- 136
KOECHLEIN CONS ULTING ENGINEERS, INC.
Consulting Geotechnical Engineerslo
t
I
I
I
I
I
I
costs are generally higher for concrete pavements, however, the long term malntenance
costs are less.
We anticipate that both flexible pavement and rigid pavement could be used at
this site. we recommend that rigid pavement be used in high traffic areas such as
entrances or where heary vehicles (trash trucks, delively trucks, etc.) tum or maneuver.
Two preliminary pavement sections based on high volume traffic and low volume traffic
are presented for the flexible pavements. High volume traffic areas are considered to be
access roads or fire lanes. Low volume traffic areas are considered to be parking areas.
The following sections present design assumptions and preliminary flexible and rigid
pavement sections. ht order to properly design the reEdred pavement sections, we
recommend when final subgrade elevations have been achieved, a Jinal subgrade and
p av e ment inves t i ga t i o n b e p erformed.
Preliminary Flexible Pavement Desig4
The design of the preliminary flexible pavement was based upon an
Equivalent Daily Load Application (EDLA), anticipated soil properties and the
colorado Department of Transportation pavement design manual, preliminary
design calculations were based on assumed engineering soil characteristics. Based
visual observations of the surface soils and review of soil investigations in the area,
we anticipate that the subgrade soils will classifu as A-l-b soils, as defined by the
IO
T
I
I
I
t
I
o
T
t 13
t August 23,2001
Job No. 0l- 136
KOE CHLE IN CONS U I.TING ENGI N E E RS. I NC.Consultittg G eotec hnica! Eugineerslo
I
I
I
I
I
I
I
AASHTO classification system. The preliminary pavement designs are based on the
subgrade soils having an AASHTO classification of A-l-b. This soil type will
generally have a Hveern stabilometer R-value ranging from 50 to 75. The R-value
was estimated fi'om the AASHTO classification of the soil. Because the R-value of
the natural soil was assumed to be 50 to 75, the use of roadbase will not reduce the
pavement thickness. However, roadbase may be required to establish a finished
grade prior to paving. The EDLA for high volume traffic for residential
developments was assumed to range from l0 to 20. The EDLA for low volume
traffic was assumed to range from 3 to 5. Two flcxible pavement designs, based on
the above method, are shown below in Table A. These flexible pavement designs
include two fulI depth asphalt pavements.
A preliminary rigid pavement section was designed using the same values of
lo
I
I
I
I
t
I
I
t
I
o
Table A
Summary of Preliminary Flexible pavement Altematives
Traffic Volume Full-Depth Asphalt (inches)
Parking Areas 3.0" to 4.0"
Access Roads 4.0" to 5.0"
Note:
Because the R-value of the natural soil was assumed to be 50 to 75, the use of roadbasewill not reduce the thickness of pavement. However, roadbase may be reouired to
establish a finished grade prior to paving.
T4
lo
I
I
I
I
I
I
I
T August 23, 2001
Job No. 0l -136
KOECHLEIN CONS ULTING ENGINEERS, ]NC,
Consulting G eo te ch n ical Engineers
lo
I
I
I
I
I
I
-o
t
I
the EDLA and R-value as those used in the high volume traffic flexible pavement
design. The colorado Department of Transportation pavement design manual, along
with the above mentioned design values, were used to determine a rigid pavement
section, The preliminary rigid pavement design resulted in a design section of 4.0 to
5.0 inches ofconcrete.
FURTHER INVESTIGATION
Due to inaccessibility of the site at the time of this investigation, exploratory test
pits or borings were not excavated or drilled in the proposed development. The
anticipated subsurface conditions presented in this report are based on our site
reconnaissance, information from nearby soil investigations and our experience with
similar locations within the Vail area. I't/hen access to the site has been constructed, we
recomnrend tltat a site specifc investigation be pe{ormed. We recontntend that site
specific geotechnical investigatiotts be petformed for eac|t building at the time the
buildings are being designed. In addition, we recommend tJtat a final subgrade and
pavement investigation be performed for the proposed access roads and parking areas.
Ifrequested, we can perform the additional investigations.
LIMITATIONS
The anticipated subsurface conditions presented in this report are based on our site
15
I
lo
I
I
t
I
I
I
t
lo
T
t
I
I
I
t
lo
I
August 23, 2001
Job No. 0l - 136
reconnaissance, information from nearby soil investigations and our experience with
sirnilar locations within the Vail area. Variations in the subsurface conditions from those
assutned in this investigation are possible. Any variations that exist beneath the
development generally become evident during site specific investigations. This report
presents the anticipated general subsurface conditions and guidelines for planning and
design purposes, Wten access to the site has been constnrctecl, we recomnxend that a site
specific investigation be perforrued. We recomntend that site speci/ic geotechnical
investigatio,s be perfonned for each building at the tin'te the buitctings are being
designed. In additiort, we recommend that a final subgrade and, pavement investigation
be performed for the proposed access roads and parking areas.
KOECHLEIN CONSALTING ENGINEERS, INC.Cottsulting G e otech nical Engin.eers
T6
l.
I
I
T
t
I
t
I
AuSust 23, 2001
Job No, 0l - 136
KOE CHLE I N CO NS A LTI NG ENGI NEERS, I NC,
Co ns ulting G e o tech nical E nginee rs
lo
we appreciate the opporlunity to provide this service. If we can be of further
assistance in discussing the contents of this report or in analyses of the proposed
development from a geotechnical aspect, please contact our office.
KOECHLEIN CONSULTING ENGINEERS, INC.
Reviewed by:
I
I
I
t
I
t
I
u;//; v H*/h
William N. Houlette, P.E.
Senior Engineer
(8 copies sent)
Project Engineer
lo
t7
I
-o
I
I
I
I
I
I
I
lo
T
I
I
I
I
I
I
lo
I
JoB No.0r-136
KOECHLEIN CONSULTING ENGINEERS, INC.
Consultlng Geotechnlcal Englneers
f
T
A
NOT TO SCALE
FIG. 1
VICINITY MAP
t\
g
tt
oo
{:€tt
(0
ciz
dt
-)
o
I
oIIIIIIIIIITIIII
o
I
dg
=E(,'*
tr, E'il5
6gZElll o(rg
=8lo-o)
u, .=
7=6E
fi3JEolrlox
I August23,2oot
Job No. 0l-136
KOECHLEIN CONSALTING ENGINEERS, ]NC.
Con su I ting Geotechnicol Engineerslo
I
I
I
I
I
I
T
APPENDIXA
CURRENT GEOLOGIC HAZARD STUDY
l.
I
I
I
I
I
T
_oI
I
I 7101 West Yal6
Avenos, No. 601
Oenver, Colorado 80227
303.986.66s8
R. J. lrish
Consulting Engineering
Geologist, Inc.
August 16, 2001
lo
I
t
I
t
I
I
I
KOECHLEIN CONSULTING ENGINEERS
12364 West Alameda ParkwaY
Suite 115
Lakewood, CO 80228
Re: Engr. Geologic Hazard Study, Middle Creek Village at Vail Development, Vail, Colorado.
Job No. 564
Gentlemen:
In response to your call, we have geologically reconnoitered. the site in Vail, Colorado,
planned for the Middle Creek Village at Vail Development, which is to incorporale atfordable,
multi-family housing and appurtenait facilities on about I acres. This irregularly shaped tract is
rociieO in i part otine StiZ SE1/4 Sec. 6, T. 5. S., R. 80 W', Eagle C9!1V' Colorado, north of
the north service road immediately west of the Old Vail/lnterstate Highway l-70 exit'.and
aOlacent to an existing Mountain Beiltelephone tower (Fig. 1). lt lies at the foot of the northern
slope of the west-treniing Gore Creek Vailey where that slope is breached by a canyon section
ot ine UiOOte Creek Valle-y. The ground surfice across the property slopes generally southward
at about 10:1 (horiz. to vert.ltroir etev. 8290 feet to Elev. 8220feet. The western twothirds of
the property ii forested witir aspen and scattered evergreens' Some of the latter are quite
large. ihe iastern third ofthis tract is covered by sagebrush and other brush types.
Our objective has been two-fold: 1.) to generally delineate.geologic conditions across the
property and immediate vicinity, and to'eval-uate the probable influences those conditions will
irave on the planned construction, with special reference to geologic hazards, such as
landslides, debiis flows, and rock falls, that could impede the development of the property; and'
2.) conversely, to assess the probable impact of the planned construction on the natural
g;of"g; tonciiiions. An ancillary goal has been to suggest means to ameliorate the risk posed
by any geologic hazards that may be discovered.
During the course of our work we have stereoscopically examined aerial photographs of th-e
property a-nd vicinity, and have geologically reconnoitered the site and vicinity (on August 15'
locjt ).
'orr interpretations of geitogijconditions across the site and vicinity are illustrated by a
geologic map, Figure 1 (attached),
We conclude that the tract to be occupied by the Middle Creek Village at Vail Development
is subject to debris itows perioOically emanatingifrom the valley of .Mill,Creek, as well as rock
falls from lhe lower part of the adjicent sectoi of the steeply inclined, northern slope of the
Eagt" Cr"ef Valley. We assess the debris flow risk to be high, and the rock fall hazard to be
medium. The former risf, we believe, could be substantially reduced one or more of several
jtternative mitigating measures, These could be selected and designed when the final plans
for the project ire OiveiopeO. The latter risk could be reduced materially by hand-dislod.ging
boulders, ittowing them to roll down the hill and onto the floor of the debris fan before buildings
are constructed on this site.
It
I
I
t
t
T
I
:-
I Consultant to Designers, Contractors, Planners
I
lo R. J. lrish
Consulting Engineering
Geologist, Inc.
Site Geologic Gonditions
The Gore Creek Valley has been eroded into the interbedded sandstones, siltstones,
shales and limestones of the Pennsylvanian-age (about 325 to 286 million years ago) Minturn
Formation by both streams and glaciers. Glaciers repeatedly occupied the valley of Gore Creek
during the lce Age, which began about 2 million years ago, and terminated only about 8,000
years ago in this part of the Rocky Mountains. The glaciers deposited morainal soils across the
lower slopes of the valley and both glacial outwash and morainal soils across the valley floor,
aggrading it by as much as 100 feet or more. The upper reach of the Mill Creek Valley was
occupied repeatedly by glaciers also, as evidenced my multiple cirques at the head of the
Valley, and a U-shaped transverse topographic profile that extends down valley to about the
Elev. 9800-foot contour. That contour crosses the floor of the canyon about 2 miles upstream
from the junction of that valley with the Gore Creek Valley.
The morainal soils generally are an heterogeneous, medium dense to dense, mixture of
sands, gravels, cobbles, and scattered boulders in a silt matrix. Mostly the soils are granitic
rock debris, but include sandstone, siltstone, and limestone debris as well. The permeability of
this soil typically is low, on the order of 10's cm./sec., but may include lenses of much more
permeable sands and gravels. The soils deposited by glacial meltwaters (the glacial outwash
deposits) typically are interbedded, medium dense to dense sands and sandy gravels that
commonly are cobbley and bouldery. These typically are quite permeable, on the order of
l0-2 cm./sec. to 10{'cm. sec. The morainalsoils blanketing thetoe of the northern slope of the
Eagle Valley adjacent to this property are estimated to range from about 5 feet to 20 feet thick.
Since the end of the lce Age, fast-moving floods charged with soil and rock debris
(essentially mud flows) repeatedly have coursed down the Middle Creek Valley, and have
deposited their bed loads out across the floor of the Gore Creek Valley at the confluence of
those valleys where the Middle Creek Village at Vail Project is to be sited. Those flows are
referred to as debris flows. Moreover, many "normal" floods have carried soil and rock debris
out onto the floor of the Eagle Valley at this confluence, as well.
In consequence, a debris/alluvial fan has been constructed at the mouth of the Mill Creek
Valley. lt is about 2000 feet long along its toe, and about 1200 feet wide from its apex in a
canyon section of that valley to its toe adjacent to Gore Creek. lt is expected to be formed of
torrentially interbedded loose to dense, sands, gravels, cobbles and boulders in a silty matrix.
The soils, granitic metamorphic rock, sandstone, and siltstone debris, are expected to both
overlie and interlense with the morainal, alluvial and glacial outwash soils underlying the floor of
the Gore Valley. These fan soils probably range to several tens of feet thick across the center
of the fan.
The permeability of these debris/alluvial fan soils probably ranges widely, due to a widely
ranging "iines" content, from an estimated 10'3 cm./sec. to 10'5 cm. sec. The ground water table
in these soils probable lies about ',|5 feet below the ground surface at the southern edge of the
property, but probably is much deeper in the head area of the fan.
The interbedded, fine grained and flne to coarse grained sandstones, siltstones, shales and
microcrystalline to very fine grained limestones of the Minturn Formation crop out sporadically
across the foot of the northern slope of the Gore Creek Valley adjacent to, and within the
I
I
I
I
I
T
T
t
t
t
I
t
I
lr
l.
I
I
I
lo
R. J. lrish
Consulting Engineering
Geologist, Inc.
canyon section of Mill Creek Valley. These are relatively well indurated, strong, hard rocks.
Their unconfined compressive strengths, we estimate, range from about 10,000 psi to 15,000
psi for the sandstones and siltstones, 25,000 psi to 30,000 psi for the limestones, and 5,000 psi
to 8,000 psi for the shales. The shales are only poorly fissile. These strata are thin to thick
bedded, and their near-vertically dipping joints typically are several feet to 10 feet apart. The
beds strike north-northwestward and dip about 25o west-southwestward, thus nearly parallel to
the contours of the valley slope, rather than out of the slope. These rocks, including the
sandstones, have very little, if any, intergranular permeability, but ground water undoubtedly
flows along some of the joint planes.
No faults are known to us to disrupt the bedrock strata underlying the project area, but
several have been reported in the vicinity. These are believed to be inactive.
Assessment of Geologic Hazards
Debris flowage is the principal geologic hazard attendant to the Middle Creek Village at Vail
site. In fact, this site effectively spans the upper sector (i. e., uphill sector) of the debris/alluvial
fan, thus could be flooded if a debris flow or "normal" flood should leap the banks of the channel
of Middle Creek at the apex of the fan at the mouth of that valley. A debris fan is deposited by
multiple debris flows, which are high-energy flows of surface water charged with soil and rock
debris. The flow is debouched from a steep-floored ravine onto the floor of a main valley, where
its bed load is deposited to form part of a fan-shaped deposit, the debris fan. Typically a debris
1ow is initiated by localized, high intensity rainfall that quickly washes loose soil and rock from
the catchment area of a ravine or canyon. This debris is carried essentially as a mud slurry.
Commonly the debris flows and the companion flood flows abandon the channel occupied by
the creek on a debris/alluvial fan, spread out across the fan surface, and even create new
channels during some events. These flows, both debris and "normal'flood flows, can seriously
damage or deJtroy buildings and their infrastructure, as well as harm the occupants of those
buildings.
We assess the risk of debris flows from the Middle Creek Valley to be highl during the
lifetime of the project, although we cannot predict their average recurrence time interval'. That
recurrence time interval is likely to be quite erratic. Their volumes could range from small to
quite large because the drainage area of Middle Creek incorporates about 6 to 7 square miles.
The high risk posed by debris flows, as well as by "normal" floods, could be reduced by one
or a combination of several mitigating measures. The designs for these could be incorporated
in your final development plans.
Additionally, debris fan soils tend to be subject to differential settlement when wetted, but
the potential impact of this can be moderated by foundation engineering practices well within the
state-of-the-geotechnical engineering practice.
' Our assessment of risk is couched in qualitative, empirically-derived terms (high, medium, and low).
The state-of-the-geologic-art does not permit a rational quantitative analysis,
2 An experiencei engineering hydrologist should evaluate the risk of "normal" flooding.
T
I
t
t
I
I
I
lo
I
T
t
t
t
I
l.
t
I
I
lo
R. J. lrish
Consulting Engineering
Geologist, Inc.
Large and small boulders of granitic rock and limestone are scattered across the steeply
inclined surface of the foot of the valley slope overlooking the eastern half of the project area.
Most of these appear to be embedded in the morainal soils that blanket that area, but a few
appear to be perched on top of that ground. Both could be dislodged by slopewash erosion,
thus could tumble down into the project area.
We consider the risk of such an event to be medium during the lifetime of the project. That
risk could be reduced substantially, we suggest, by dislodging the exposed boulders by hand,
utilizing a steel bar, and allowing them to fall onto the surface of the debris fan down slope
before any buildings are constructed on this tract. The area to be serviced extends from the
northern side of the fan surface up to a terraced section of the slope about 150 feet in elevation
above the fan surface, and from the eastern side of the property to the eastern side of the
mouth of the Middle Creek Valley,
Boulders perched on, and partly embedded in the morainal soils across the toe of the Eagle
Valley slope west of the mouth of the Mill Creek Valley may be dislodged naturally from time to
time and roll down the slope, but they should not travel into the western section of the planned
development area. Instead, they are likely to be trapped in the channel of the creek, which
traverses along the toe of that slope. Any that may skip over that channel, however, should be
trapped by the dense brush and aspen west of the Mountain Bell tower, or impeded by the
tower buildings.
The soils and rock underlying the Eagle Valley slope in the vicinity of the planned
development site appear to be relatively stable. We observed no landslides there or ground
surface cracks that might presage landsliding. The granular soils of the shallow sloped
debris/alluvial fan do not evidence instability or incipient instability.
The 4O-mile long Gore Fault, a major mountain-bounding structure on the western side of
the Gore Range, lies about 4 miles east of the project site (at its closest approach); the SO-mile
long Mosquito Fault lies about 12 miles to the west; and the 25-mile long Sawatch Fault
terminates (at its northern end) about 24 miles soulh of the site. Some seismologists consider
these 3 faults to be potentially active; but most seismologists, nonetheless, consider the risk of a
strong earthquake generated by those faults or any other fault within a hundred miles of the
project site to be low to insignificant during the next 100 to 200 years. This is not to say that this
part of Colorado is seismically quiescent, but the earthquakes generated by the reactivation of
faults in this region should have small magnitudes. Earthquake intensities of V to Vl, with peak
accelerations of 0.059, we conclude, are unlikely to be exceeded at this site during the life of the
project.
So long as the construction of the planned buildings and appurtenant facilities does not
materially change the existing ground conditions of the natural soils and/or bedrock, slope
stability should not be impaired. lf cuts or fills in excess of 5 feet high are needed, however,
they should be designed by a geotechnical engineer experienced in that work. Ponding of water
on the debris/alluvial fan slope, of course, should be avoided because seepage water from a
pond could build pore water pressure in the debris fan soils, thus could trigger ground
movement.
t
t
I
I
I
t
T
T
t
I
I
T
I
to
l.
I
I
to
R, J. lrish
Consulting Engineering
Geologist, Inc.
t
t
I Otherwise, the construction as planned should not increase the geology-related hazard to
other property or structures, or to public buildings, roads, streets, rights-of-way, easements,
I
utilities, or facilities.
I We have appreciated the opportunity to work with you on this project. lf you have any
I questions. please call.
Yours truly, /I @9eI Robt. James lrish, P. G.I Consulting Engineering Geologist
Io
Io
I
T
I
I
I
t
t
t
(_)
EI.l
;lxl
;l;lvl
-1-_<
ffiH E ffi
Oz
Jq
O)
I .n
-i L!^:z-(J zL!
z
)laz.
O
F
L!F() z r-'to-{ulXSi=*>-xO ::]i)lLrJ-Ylr>XV L,J tJ -
/.\+|J iYO )ii J<- r-.,1 < >6>
O
(o
Lr)
'loz.
cl
--)
O
t-
€o
trl
F
o
-.: ,i
.-_ ' " '_
-.. j..'. .
-+ -.1--- *.- i:.,.^". -- .."--".; -.i."i-.{*Li,-.,.-r.,tri-',i1
' '-.\'.... j ''. !'1,.--'' -' --.',,' .",',,'t'.,"j,l {'u!.,t'i:'Ud,3
ffi
$,
E
!t
,n.i
r?1
l
t
i
oI oIIIeIIIrIIIIIIIIII I
I Ausust23,2ool
Job No. 0t-136lo
I
I
I
I
I
t
I
KOECHLEIN CONS ALTING ENGINEERS, INC.
Consulting G eo te c hnic al Engln ee rs
APPENDIXB
PRBVIOUS GEOLOGIC HAZARD STUDIES
lo
I
t
I
I
t
t
_oI
T
ovttsttyaL vai tc 3v367o7L62 oDELL AFCHITECT PAGE A2
I
Io
I
I
I
I
I
I
DEBRIS FIO}Y AI\TD RoCIGhLL IIAZATTD AIvALYsIs
,'vioiJNr^ii.{ BELL" SITEi.
VAIL, COLOri.Ano
I
lo'
I
I
I
I
I
I
:J
Preparecl For
Mr. Duane Piper
Prcparcd By
Arthur L Mcars, p.E., Inc
Gunnison, Coforrio "'
Novenber, l99Z
ofr-h4t-kthl
(lo/ GJ,/ r,pqt a>; a(+J$Jb /13 /tbz UI.)LLL ARCHI TECT FAGE A3I
I
I
T
I
I
I
I
I
1 SUMMARY AI'ID RECOMMENDATIONS
Th; follcwing sunrn:orizcs tho Iindings of this study and provides reconrnrendztions. Additionaldctail is given in Seljons 2 - 4 of thc rcport.
ROCKFALL
Rockfall is not a potcntial hazarcl .to thc proposcct clevclopment as shorvn on a conccptual sileplan prcparcd on 3-L9-92 by AJpinc Infcmaiional. Tbis conclusion js basccl on ri. fofioiuinjobservationr;:
a. Ilockfall sourcc arcas do not cxisr abo.,,c the cas rern portion of th: proposcd
devcJopmcnt (the,,East parccl,,);
b, Aithough rockfall may occlJr abovc rie,,west pnrccl,' jt rvill ccnsjst ofnrodcrr(c-sizcd, rarc rockfali cvcn(s thct rvili aot rcach rhc proposed builciing.
DEBRIS FJ.OWS
Dcbris flo*,s rviI nor affect rrc Easr,parccr orr .f;;;"',[,u.r,parcer. This concrusjonsare based on thc follorving obscrvatibnst \_ /
a. 'l'hc Easr Farcc,l js uor in linc rvjth dcbris florfsJ---:----
b. Ttr i s'cst parccl is rocatcd on an arruviai fan produced by dcbris-florvdep.sition as cvio'cnccd b;' r) granitc bourdcrs l - j fcct long on the surfacc, 2)dcpnsitional lobes 5 fcct high, an<i 3) a large sourcc area;
c' Thc.florvs may.bc dccp as thcy arg channelired t,luough the canyon crodcd intothc bcCrrtck di..ectiy above thc site.
REcONf\{lri{DATIONS
T'hc follorving rcccmmcndafion altcrnotives are bascd on lhc conclusicns ouflined above and onmy cxpcricncc rvirh rhc dcbris-florv proccss in vail cnd at orher rocations:
a. .,\yoirj construction on thc Wcst parcet; or
b. Dcsign structures on the wcst parcel for impact and dcpositionar forces fromdebt'is flows; or
c, Procced rvith thc dcvcloprnent plans as shoryn on rhc 3_1,9_92s;udy, build_no^mitigation, and accept rhc rjsk of flotvs with rctumaoploxinratcly 300.- 1000 ycars that would damage struclurcs.
I o'-
I
I
I
t
I
t
rL-o
t
I
conceptual
pcriods of "
'l' r''.,
1
I
." " | 1f( 1jrs"1 i s'irin"r ;r, l l" ?o&' ?v l'uo f u r o r ri l TEIiR^CON
UTILLL AI{UII I I LU I F'AUt 4q
0oozI
lo US Weli Wireless LLC
1301 E Colfax Street, Suir€ 3,4ltenv6r, CoiOrudo g0220
Atln; Mr, Jsson Littte
Re:
.G.lgloeic Hr:i76 ln"urUgatton lRrv,sion il
.tjS..W:tt Ceilutrr Site, tUrU_roe'-- -.-.-,, ,,
veil, Colorrdo
Tcrrcon projcct No. ZJgSSrfg
lfbrra-con
For{ Cctil! Cdo,E6 O06a I .OSOJ(970)a6.{33e rrr-(czol.8ais.
I
t
I
I
I
t
I
I
I
I
I
I
T
Ilo \-
Dear 1v11, ;-;91s,
As regueltcd, Temcorre,crsncs6.,".,,*#,lil-j,lTj,,J1.?;:*:l;ffi 1gilflffi L:*,",ff .:f ;;heve a sma, addirion placod on *," nonn iil" *ii" ,rlrtng tacliry. The eddition is b ben]'o#ffi:n. esuipmenr ancrtcr *r* wii *'**ori *, lrni."r,?fier o*ne
On Juno 1 i, l ggg an en(linaar;..^
:r,m,,u: ;f ffiy. {iil:i ":,il ffl. H
"
L"nffi [:$r" _: ff:
m"n:T.x;rl,#:l:"ffi :;f ffi ,.,I::::l;;",.,,s1*11*T;;
rhecreeko;*;;;;;.T,#f -,fj;'trljll;I-Tff ''.^,iil,f d."'It#lIocated sast sf the proposed facirrtv rne ix,rilo-,rt *o *cirity is r murti-story concru,ustructura with en exieting tower. A *"*"
".i"iJu*,on sware was norcd .found thenodh, eesq and west slteg of the existirs h,itdi;l, "'"
ff i':",ifft#rr11;:::t* (Bu'Leke).se Eruviarran doposits. rhe deposirs ere
ctasts .," subengurar to .,1
t"* grael' cobblos, and.bouiderg. *. nori-i"'ior*,
:H:[:T T: m*tT**fri l F* r""*";f [x il:tr*i:':fl ,ffi
congtomerate, ,t"r., wir,,''1-lTtpris:d
ol red to prr'nk interbeddco ,n'tl oi'"""o.**,
north and'p. .0o..*'',:[ y::T H ni"Hi:';r*,fJilil *f#,:f il::ff;11#ffi#n:':;l]JT,t'**ffi # uiw*.t ra,*tv near rhe mouth o'he
Tns city of Vail debrls f,ov
situated bctwecn ro.r. rnrr tev-Il _rock lall h.zarc meps show the us west site berng
:fl "I."tx.il",ilr,ty:ii[i{f iil,'J:i,;,il,*::,1*:j;:lE
rc con na isc e n ce, n[,,,'
"i,""i"'R il:*, ff :.$,il I i ff IiJ*l
".:,1,* :l:
"**f ffi'#tH' *"Hf t-niJffi n' ffi Hs:!Jil:r1H5,i.ffirJ,ffi *,*,OUIID Ga*.xtr! |t|.a .lra,
lo'-
I
I
I
(6i L1/.1v't4), s'J: t4 jssb-/4.7l_62 oDELL AFCHIIEa:Tr, vt/LtlEo ruN l;i:4{ l,.r.,r urtt-iul ortl tsn[ic-d'N-
':
I
PAGE A5
0ooa
to two rock tsll h8z€rd zon€
identifies rr,' ;; ;';t^]'':n aro- adjacent to the
opinion rhanhe enrre
",*,,1i.1To,
r"'il,.n-s';;; ;;:*' The debris flow hazrrd map
are rocared courd bc,n.,uj|
t:n Irpon vrhrch il;;;:ttn courEo of the stream lt ls our
rs Incised into irs channE,'I ':.: o"t"t ttl" i"z""i.,u
frdlity end the Prcposod additlon
ooricve rhe rhk of debr,r *1lo-1"
.**t* Hil;;:n€' Howevsr' because the slrclm
wil be an unoceupiod.r"J-tlI"]P *" *titti, ffi
drve.ion etructurcs in pl'ce' $.E
noi appear thrt con:ctivcYip lt* "";;;;"J'a'|'
Abo' the proposed addtion
addition. [ 1s dso or,. oo,-:11::erlng or r*#;; Bnglneerlng Pcrspect'ves' it doc$
Incfoase the seologrlc nazall
tntt tnJ"*t t,Jln;rf*"tt are wananted tor he
gcofogic haerd' such as 'to-t ro.th"' t*ouil':;''"" 15 by 1s toot addition w'l not
o brerved du rios *re,,,.," Jillllff Yffi::: : ilSffi:
"n #il::# il*
t
I
l.
ili
I
I
I
The analyres and rccommyroryi "ir;Hil':H"'J|ij "lt:^:f:.::^.T.cd
upon vrEual obssruauons
seot.chntc€r ;";";;.;; '* sooNa of seruiccc tot
l3_1to..t i*;;;:'il;
fTl,-,:, "ril;il.',.:il*Ll ff ilT,rg, ;g*, ;.";;;;- #;;0. .,
ls- Tn:trncd about thc goorecnnicar esn .+! -, ..^ -
u'fr geologle sofling, lf thc client
seqtechnical *ir. inuortiffiilT"Xf of the projg6, i,'r *gs.r,rdil;ffi;
Wo-eppreciale the opportunity to wr
:l:eminS thls report, or if we maycontrcl ug.
with you on this proteqt. tf v
" r*n' **d'rj r"j;'lllTtr#t H:fi;lo'"
Oaal';,"Vq+,
t
T
I
I
t
I
Sincerely,
TERRACON
\t./)
%l^frA
Doug L&ttgrJn,tc,p,c.
trngheerjng Geologist
Rcvielrred:
Copias to:Addressee (?)
tr \'-o
t
t
Oflicc Manager
a6! tJ rt itJL L ttli lq 3V3b tq t!82 EDELL ARCITITECT
Nlcholas Lampiris, ph.D.
@fasulT/tio oEoLocrsr
gr83 vALtE/ ROA9
cAREOt{DALE, COLORADO 81 623
(flF)$0.3.@ (a. HouRll
l'1i\' ?8, ''l991J
l.tol I v Fir-rthsr'.f or.d 1 ili rectc:r
ALtC g-noot
l. ?? Nl. FrontEQe RoeidVii I, C0. 8t698
Rll: l-tctEkf irI I Evaluiation
Doar f'1s. Fir.rt her,f or d !
i h5\,er vt si ted the Eite o{ your. e cnocjl .1i1d noted the .{.e6, .f arplanned expansion orr the north gidE fl.f tt.lL: e),tirtingstructurrp. ThE propoged adcji tiorr .j g glro{dn un(ler seps\ret s
qc|v ar .
I hB.,,E al sr: rrotecl thc poE: ti on o{ the sctrpr::1, wi th r-otrpect tothe €eiilnqi t: roch:,taI l h,r:ard mspplng bhat.lt prodLrcr.,iJ ,f ;i- tfrr-;]'or.lr o-! VEii in 1?84. Tha schscl ig Eirnr,rn hJl f.hri .ltic:
cdteqJory, o.f r'r odr-:rRtc r.(Jcll.f sl I hg;i,nrd r,' bi..rt un Cetai J.,_:ril
i nErproction i bclicve that tha Ilne,. shorrld hef smendeij tn snrr*I'ihi3t your .rchool and itg proFqcuql adcliti.qli ..trr- oo no{: *i. tn:n arDctr{'al I hn:a'd !on9. I gurbmi tted ,rn ovr}r.J. }ii v 'r. c ths Le:rrni nr;Tree gchool ln 1986 whlch shqwed d n*w wer:,t bsrrndsr.y i.r,f 1:hra
rllrBppecl hasard ;one {strther to thg cast arrd Eher-ef ore notincludihg your school . I do, however o iinC thar ^ere ;s agfttr i " f lr:w harard to thF Bchool .
Thit ccn, *nd rhould, bo rnitiEatorl aE we diracuslred in Urq
'f' j, el d I ast weel4 by cl*tcndt ng and perh.pei ncldi nE t o thErerxist:irq low, linesr rocky hillside, ncrr.thi4€rst o,f the s:troori.,which wa$ {c:rm€d by a previous cJebris f lot.r decados a.Eo. Thq
rlti.'l ! B.rti or) Ean be extended to a point pur.t r.lay t,: 1.,i.ra slearFfri 11si de be;,onr! the school to provida protection ts, t n li"r
ti').::. ,r:. lng burriSing and tho propofad aCditi(Jn, or it c;rrr be
err ter:ded al l .!ha way Fo tha steap hi l lr,irle" theret:vPrntcctin€ thr pleygrouird ereeE narthe'i$t c.f the schr.roi aswell, The configuration of the berm in ej ther. case sjhoul.c, bet-.st,rbl i shed itl the f1€ld ln concarr.t wltl.l ),oLrr arqfi:i tect: , b(-itcd\n be oNpncted to har.p a finlsh€d net'vlsrhical re] j,e.f on r r:ewes;'l Fr. Je o,f eooLrt E to t () {eet,
I'AUL UbI
--';lo
t
I
t
t
I
T
t
I
I
t
t
I
t
Io''
la'
t
I
ta61 l.J / tvaL UYi 2q 3036 78715?ODELL ARCHITECT t-AuL t1 I
^.-,...--E-"--I
to
T
I
t
I
t
I
t
t
I
I
I
I
I
In the rlor Fr case, debrlg woLrl 4 he {rrr,cEd to {low aruLrnd .trrs6cl'lltol and tha proposs(J adcjition he hrrUh rri,Jcsi ifl t:he.Iatter.:aser nl, 1 'lhe debrj ! woLrl d be {orcect tLl .f low betrvecrri tn4sl.lllJt!ci: pr-Eper-ty ahd the llt. BBI l. in.c;tal. lation t i-; t"lt€ e/est:,Tirey are Frab.'ibl ! i$Jr1r-E o{ the potr;nt i a:1, hat nr,C [:er:rru:r,e ;nE),fta'zc btri )' t e, concreuE di'ttrh anct dn.t l t:ri:ti r:ir'r ,:i!r yr €r rr to u/ crr:rrtrttn'trl.r F,rc,ocr'l),) tJut ! srin not arnn\ri:..lcc,rl th.it wi-!d,t i:hs\,, h.1\.J!.il:rjf-\j*t uCteC r,-rr.l I provrds Ariec;uatr.':'1:l..Ct,.t,c.i:i i:)n ifi tr;;a {iv($flt, l:.,;i{ l-1r'ge r,eb:- j !r {1ow emanatir.lg +roln ttrri. qr,.L.J.:} \, t( t:i{, r.:,:rr.tf1 ,
l"h," t!,vo c::llFiceii *of tti.L{getil.}E dabr.i:, .f l (:,!a t:*:::rr.ci ;it; \,,{)ui_.qi te that I l-ewn de6cribecl wi f t np! i,nr-re,rs*, tno -,an=",j"
.,oottrer frrapcrty or struc!uresr or to F,jtrl,:ic l::Lti lijiflq6, r.i elrt::_Q{-(^J.yr roadsr Etr4el5r' aiaSementg, ,-,ii:i i t:i, i,r,,s or {,i,{r Ii,i:reir or,.other prorlertl es of any h:ind. If thi;rr.e iiu- *:i .tt,ri-tF,$r-qi,resti (rn$ 1 Dleage dt] npt her,i,!str.:r t* spnr,a{;.f, ne.
lo'"
Si nc€r'e-.I i/,
UU"a^"LNt cliol a:r l-a,ilI: j, r i/,;,
Con.slrl i: i riq Ooc; I i.ri; i s,t:
t.
I
I
-e )-
F6 .e s9,)? oY
. l, .l
iiiriii
i"
J
r 19
g
3
9g!rl
i q E;n E;F -scr*
-1-'tri, i giis {[r -!EA : < Q- tdza . t 4t
il{' -lU6als ii e- i9.: e-a zil
' !:1zl
E -9
9 -F
I
o)
cn
c)o
tr
(rt
o
ro
Gl(DL
ttLctN
6t
FTH
: ; .ru
=F
: ^Hxi^EAX r F
=a='?i=FE
E-e
I
, EF.;l!;irEfti"t;!- .l:l
Cte
, g Ja1 rar
-9
!n lu". Eg " $
, Jt-i -,'x"
i.BE 66i flr
t "e .5
P
I
5
?q
lH n
E
i
1
I
I
F -t
oF
t..qa"
i "E
p
"f
:tPI-3E5
IiErx
--JL ,
I
,/l
1i
t
t
,,l|i,llli
I3E -S
Jl?T'"0"'
TDA
OLORADO
INC.
August 23,2001
Lee Mason
Odell fuchitects, P.C.
32065 Castle Court, Suite 150
Evergreen, CO 80439
Re: Vail-Middle Creek, Trafftc
Dear Lee,
As agreed, we have prepared this initial review of traffrc issues associated with development of
I 50 to 200 affordable housing units in the town of Vail along North Frontage Road, west of the
Vail Road north roundabout. We will follow this initial review with a detailed traffic impact
a$sessment at a later date as the project proceeds through the Town of Vail's development
review process. At this time our review covers two site planning considerations: potential
vehicle trips generated by this project and, site access and circulation
Vehicle Trip Generation
We understand the project will be up to four stories, specifically zoned as Affordable Housing.
Occupants of the studio, one- or two-bedroom dwellings will be seasonal workers primarily,
employed in the Vait Valley. The approximately 6.5-acre parcel will also have a freestanding
early childhood learning center. This will replace an existing day care facility on the property.
Most of the parking will be located in the hillside behind the clustered housing units, east ofthe
existing Mountain Bell tower.
Typically, a multi-family clustered development ofthis type could be expectedr to generate
,rihicle trips at a rate of 6 to 7 trips per unit per day. Entering and leaving the site is two trips,
one in and one out. If the site were to have 200 dwelling units perhaps up to 700 vehicles would
enter and leave the site each day; yielding 1,400 vehicle trips daily based on typical trip
generation characteristics.
However, we believe actual vehicle trip activity at full occupancy would be noticeably less than
the typical suburban townhome or apartment complex. We believe walk, bike and public transit
will substirute for many of what otherwise would be local vehicle trips, Reasons for this are:
Reduced Auto Availabitiry -Many of the occupants will be seasonal and local workers.
Auto ownership will be relatively low with many seasonal residents relyrng on public
transportation or carpooling for discretionary trips to avoid the cost ofowning and
operating a private vehicle for a short term.
I Institute of Tranqportation Engineers pubfi cauon Tip Generation, 4h Edi tion
Tronsportotion Consultonts
1 575 Lorimer Street, Suite 600 . Denver. Colorodo BO2O2 . (303) 825-7107 ' FAX: 625-6004 E-Moil: TDAColo@ool com
[.ee Mason
8t23tol
Page2
Site Location ond Layout - The location of the site, about 7+ mile from Meadow Drive in
the heart of Vail Village, will b€ convenient for walking or biking to many of the Town's
job locations, eateries, convenience shops and recreation opportunities. The site layout,
with a strong street orientation and parking tucked behind the units, follows the tenants of
Transit Oriented Development (TOD). Residents choosing to walk or use public transit
will have access to a planned bike /ped trail and a bus stop literally "outside their front
doo/'as depicted on your site plan. The Town of Vail's public transit system is one of
the most heavily used in the State of Colorado. From our experience at a number of
resort communities throughout the western US, Vail is the standard which other transit
systems strive to emulate. Residents and visitors will have access to Avon, Beaver Creek
and downvalley via ECO Transit (Eagle County) express buses connecting at the Town's
transportation center - about a lGminute walk and in-Town shuttle trip from the site. Car
drivers, on the other hand, will park in a lot behind the building complex, driving around
the complex to access North Frontage Road. This configuration is the equivalent, on a
single family neighborhood scale, of alley parking and front yard porches. The message
that the automobile is of lesser importance in site design choices is clearly conveyed.
We expect the access, convenience and economics of altemative modes for the seasonal residents
of Middle Creek Village will yield a vehicle trip reduction of 30 to 35 % from the "6pical" as
determined by standard trip generation references. lnstead ofthe 1,400 daily vehicle trips that a
200-unit apartment complex could generate in a typical suburban setting, we estimate trip
generation for this pdect will be in the order of 950 trips per day.
Site Access and Circulation
The site will have two North Frontage Road access points as shown on your site plan. The west
access is the existing road to the Mountain Bell tower. This drive will be used by residents
parking in the small lot near the frontage road at the west end of the site and by those driving
west ofthe project. The east drive will be convenient for day care trips and others driving
through the main Vail I-70 interchange.
North Frontage Road is located within the I-70 right of way and is under the administrative
jurisdiction of the Colorado Department of Transportation. In accord with the State Highway
Access Cde, eachdrive will need formal access permitting. The existing west access will need
a repermitting since there will be a change in use of the access. The east drive will need an
access application zubmitted and approved by CDOT Region 3 in Grand Junction. CDOT
usually requests local concurrence before issuing a new permit. We can work with your civil
design firm (Peak Land Consultants) to prepare the necessary application documents at the
appropriate phase of your design development process. CDOT has a maximum of 45 days from
the time a complete application is submitted to render their decision.
From our discussions with Jim Ellerbroek ofPeak Land, there does not appear to be any sight
limitations along the section ofNorth Frontage Road. Location of the east drive should consider
right turn deceleration in a zone where vehicles coming out ofthe roundabout will be
accelerating up to the 35-mph posted speed. At a minimum the east drive should be stopping
sight distance from the roundabout which for 35 mph is 250 feet (wet pavement). CDOT may
Lee Muon
St?3nl
Page 3
require a right hrm deceleration lane or just a right turn taper for the east access. Acceleration
lanes are typically not required when the posted speed is below 40 mph.
We trust this initial traffrc review will assist you with your upcoming project discussions with
Town staff We look forwardto working with you, if needed, on futuretraffic irnpact analysis
for the Middle Creek housing development.
Please call me if you have any questions on this review.
Sincerely,
TDA Colorado, Inc.
o
sffo/
o
o
Preliminary Drainage Report
For
Middle Creek Villaee
Town of Vail, Eagle County, Colorado
August 27,2001
Prepared For:
Odell Architecrs
Prepared By:
Peak Civil Engineering Inc.
1000 Lions Ridge Loop
Vail, Colorado 81657
Introduction
The Nfiddle Creek Village site is a parcel of land in the Town of Vail, located in the
Southeast % of Section 6, Township 5 Soutb Range 80 West. The site is north of the
north frontage road of I-70 approximately % mile west ofthe main Vail interchange. The
attached vicinity map shows the project location. The existing site proposed for
development is approximately 8.1 acres and includes the existing Mountain Bell Road
and the Qwest (old Mountain Bell) microwave tower building. The proposed
development plan consists of 8 multi-unit buildings with related parking and appurtenant
structures. Mountain Bell Road would be extended through the site to create a loop to
and from the north frontage road.
Existins Hvdrolosv
Mddle Creek passes through the property from north to south approximately 250 feet
west of the existing Mountain Bell Tower building. The Ilfiddle Creek drainage basin is
approximately 6 square miles and is included nthe Flood Insurance Study of the Town
of Vail dated November 2,1982. The hydrology of the drainage basin will remain
largelyunchanged as a result ofthe proposed development. The 100 year floodplain
based on stream depth, as shown on flood profile panels 07P thru 09P, has been
delineated and is included in the appendix.
The westerly 1/3 of the proposed development site (Z.A acres) is within the Middle Creek
drainage basin. The existing Mountain Bell Tower building, parking lot and driveway to
the north frontage road occupies 0.9 acres ofthe proposed development site.
The easterly 2/3 of the site (5.3 acres) flows south to the roadside ditch along the north
frontage road which flows east toward Spraddle Creek.
All hydrology calculations in this study utilized the Rational Method. This method has
been shown to be appropriate for calculating the hydrology of small drainage basins of
fewer than 100 acres. Runoffcoefficients were taken from the Urban Drainage Manual,
Denver Regional Council of Governments, Table 3-I , and rainfall intensities were taken
from the Taw of Vail "Intensity - Duration - Frequency Curves". The table and curves
are presented in the Appendix.
Pronosed Hvdrologv
The development of the existing site will utilize the existing drainage basins with 1/3 of
the site draining to Middle Creek and 2/3 of the site draining to the north I-70 frontage
road ditch. Approximately 9.4 acres of offsite drainage flowing through the site are
included h the rational method calculations. Proposed drainage patterns through the site
will approximate the existing conditions. No detention is proposed for the site. The
sunrmary table presents the results of the study with hydrology calculations shown in the
appendix.
Water Oualitv Issues
Proposed inlet design will include additional depth in accordance with rown of Vail
standards to facilitate sedimentation. Proposed sedimentation pond at the southeast
corner of the project site will also act to promote sedimentation and infiltration of runoff
from the site. All swales will be grass lined or lined with rip-rap when water velocities
and slope mandate. Additionally, silt fence and straw bale dikes will be used throughout
the site during the construction process.
Proposed drainage improvements include extension of the existing Middle Creek culvert
to the nortlg catch basins in Mountain Bell road at both the southwest entrance and the
southeast entrance to the site, and culverts under the Mountain Bell road enrrances to
accommodate the north frontage road drainage. Hydraulic calculations for the drainage
improvements are included in the appendix.
Conclusions
Runofffrom the proposed development will follow existing drainage patterns. The
proposed sedimentation basin will serve as a water quality feature io pro-ote
sedimentation and infiltration. catch basins wifi have additional depth to further
facilitate sedimentation. Inlets, catch basins and culverts will be designed to safely pass
the l0-year event. Sur ce drainage improvements will be designed to safely pusj tLe
100-year event without damage to property. As the site plan ii refined, thii drainage
study will need to be updated.
o
Apnendix
o
o
En\tr
Etrl{
EJ-tlltt "-
ItEvIolll r t.t!ghdof,s
ul 5 tEiH
E
z.
tlF
{
NTS
h
F
odoo at! cl
EIIE E
mql lot
SCET
1
c\J
C\J
CD
=
E
OJ-
LD-
;
F
oJ
cfr-D
CD
CAo
o)
cJ)
(It
c
(o
--!-
>--
o-
DRAI NI1Gi CRITiRiA NANUAL
TA3LE 3-1 (l!l_
RICOI';i.iENOED.RUIICFF COEFFiCiEiITS AND PTRCENT ]MPERVIOUS
RUIiOFF
LAND USE OR
SURFACE CHARACTERISTICS
PERCENT
IMPERV I OUS
FRtqu illcY
s l0 100
,'.
-.tI
Business:
Commercial Areas
Neighborhood Areas
Residential:
5ingle-Family
Multi-Unit (datached)
Mul tj -Uni t (attached)
1/2 Acre Lot or'Larger
Apartine ni.s
Industria'l :- .
Lioht AreasG.q<
Heavy Acres
varKS,. Lelne[ar] es:
Paved
Gravel (Packe$)
Drive and !|alks:
Roofs:
Lawns, Sandy Soil
Lawns, Clayey Soi l
N0TE: These Rational
n1 ' oT RR Ray5 ,61 .o/ ruu
70
*
70
*
70
80
YU
7
.60 .65
?n
7l
.65
.70
.t1
.70 .80
.5U .0U
cn 7n,-yy--a't v",
.i0' .80
.40 .60
.70 .80
. ie
nao'
i1
E1
fl
.6U
.-10-
(See "Lawns")
.60
A.,.qJ
11
n
?r
,$
il
Playgroundsi- ,
Schools: ..,.. '^. -...
Rai]road Yard Areas\i- 20
iJndeveloped Areas:
Historic Flovr Anaiys is- 2
Greenbel ts, Agri cu'l tural
0ffs ite Fi ow Analysi s 45
(when land use not defjned)
S lreets:
.87
.40
.87
.88
' .50
100
40
o6
90
U
U
ae Rq,(-_--. -
Formula coefficients
.80 .85 an
r,ray not be vajid for
on
tn
large basins.
.00 '.01 .05
.0s .15 .?5
*Spc Fin,,"o ?-1 fnr norront imnorvinrr<
^ rw, Prl
u-1-90
Iloe n:' nOA r:.j1/iC nrln qr nn^ a^^rTn^r ^r.-r.r-?
FROII: DRCOG URBAI{ STORM
DRAINAG€ CRITBIA MANUAL
//VTENS/TY - DURATION -
FREQUENCY CURVES
n
( TIME
30 4A
MINUTES)
a
Hvd,rologv Calculations
o
IEi.'E
i€lElE
S€ET
1
o
o
=:z
oo
CU
(o
c\i
6
CU
CU
ot
=<
Eq)-
-?
trJ
z.
CEo
gl-
g)
o)
U)
OJ
CD
c
c:l
z
o-
t-a=/,)lii:::V ,f--.-=1.:Y,:;ItH/t;;{,,V.,
Etrl
e.E
.u98n:99;ld5
=HevY"
H.l = '4=<f;;hEE
Hg;
EE:IUE
z.
EF
MIDDLE CREEK VILLAGE
RATIONAL METHOD
TOTAL AREA =
C1-PVMT&BLDG
C2 - FOREST
ClO =
G100 =
8t2'v01
WEST DRAINAGE AREA - EXISTING CONDITIONS
2.E AC
0.7 AC
C10 = 0.88
Job No. 1039By: GKM
Runoff Coefficient - C
from Table 3-1, Urban Drainage
Runoff Coefficient - C
from Table 3-1, Urban Drainage
n = 0.025
A/P = 6/13 - 12'\,1rx0.5'd
s = 0.11
Intensity (l) from
ToYvn of Vail IDF curves
C100 =0.89
0.50
0.41
0.60
O
tt = SFIALLOW FLoW s50'@ 40%
V10 = 1.49 / N x 14,1P1^ 2f3 x S^ 1t2
V100 = V10
T2 (10 Y0 = 550' / 1 1.76fPs x 60
T2 (100 Yr) = 550' / 11.78fps x 60
TOTAL f6lQ = !1.{ + .g =
TOTALTcI00= 11.6+.8=
INTENSITY(l)=
ll0=
ll00=
PEAK FLOW RATE ( Q )
TIME OF CONCENTRATION
Tl = SHEET FLOW,300 FT@ 4O%.
Tl (10 yr) = (1.1 - 0.41) x Length ^1/2 / S ^1/3
T1 (100 t4 = (1 .1 - 0.60) x Lengrh ^1t2 | S ^1't3
2.1 AC
C10 = 0.25 C100 =
(0.88 x 0.7) + (0.25 x 2.11 t Z.o
(0.89 x 0.7) + (0.50 x 2.11I 2.5
Q=ClA
(0.41) x (2.2) x (2.8) =
(0.60) x (a.0) x (2.8) =
16.23 min.
11.78 min.
11.78 fps
11.76 fps
0.76 min.
0.7E min.
17.0 min.
12.6 min.
2.2 in.lhr.
'0.0 in./hr.
2.51 cfs
6.69 cG
Q10=
Ql00=
MIDDLE CREEKVILLAGE 8l22tv1
EAST DRAINAGE AREA - EXISTING CONDITIONS
MTIONAL METHOD
I ToTALAREA=
Cl - FOREST
14.7 AC
14.7 AC
G10 = 0.25
TIME OF CONCENTRATION
Tl = SHEET FLOW, 300 FT @ 41oh.
T1 (10 yr) = (1 .1 - 0.25) x Length ^1/2 / S ^1/3
Tl (100 yr) = (1.1 - 0.50) x Length ^ltZ / S ^.t/3
T2 = SHALLoW FLOW, S50 FT @ 66%.
1O'WDE, 0.5'DEEP
V10 & V100 = 1.49/n x (A/P)^.67 x S^.5
V10 &V100= 1.49/n x (5/11)^.67x.66^.5
T2 (1OYD = 950 / 14.3 x 60
T2 (100Yr) = 950 / 14.3 x 60
T3 = CFI,ANNEL FLOW, 500 FT @ g%.
ROADSIDE DITCH - 2'DEEP 3:1 S|DES, n = 0.05
V10 & V100 = 1.49/n x (A/P)^.67 x S^.5
V10 & v1 00 = 1 .49/n x (12n2.A)^.A7 x .09 .5
T3(10Yr)=500/E.7x60
T3(100Yr)=500/8.7x60
TOTALTcIo= 19.9+ 1.1 + 1.0=
TOTAL Tc100 = 14.6 + 1.1 + 1 .O =
INTENSITY ( | ) (Vail IDF Curves) =
Job No. 1039By: GKM
0.50 Runoff Coefficient - C
from Table &1, UDan Drainage
19.92 min.
14.06 min.
G100 =
14.27 tps
1 .'t min.
1.1 min.
8.65 fps
1.0 min.
1.0 min.
22.0 min.
16.1 min.
n = 0.05
A/P = 5/1 1 - 10'\,\1x0.5'd
s = 0.66
n = 0.05
Np= 12112.6
s = 0.09
Intensity (l) from
Town of Vail IDF curves
1 10 =
ll00=
PEAK FLOW RATE ( A I
Ql0=
Q100=
Q=GlA
(0.25) x (1.9) x (rl.Z) =
(0.50) x (3.7) x (14.7) =
1.9 in./hr.
3.7 in./hr.
6.98 cfs
27.20 cls
(A
rfil
l
I
ll
nt1/a .-7-o
CI'-tm
;ifiEt
;VU
$u,,i,
MIDDLE CREEK VILLAGE
DEVELOPED DRAINAGE BASINS
TDVN OF VAIL, EAGLE COUNTY, CILORADO
,: t\.!
l/T
MIDDLE CREEK VILLAGE
MTIONAL METHOD
TOTALAREA =
Cl.PVMT&BLDG
C2. FOREST
ClO =
Cl00 =
2.8 AC
1.3 AC
C10 = 0.88 C100 =0.E9
1.5 AC
C10 = 0.25 C100 = 0.50
Job No. 1039By: GKM
Runoff Coefficient - C
from Table $'1, Urban Drainage
Runoff Coefficient - C
from Table &1, Urban Drainage
n = 0.025
A/P=6/13-12Wx0.5d
s=0.11
lntensity (l) from
Town of Vail IDF curves
8t21t01
WEST DRAINAGE AREA - DEVELOPED CONDITIONS
(0.88 x f .3) + (0.25 x 1.51 t 2.8
(0.89 x l.3l + (0.50 x 1.sl t2.8
Q=ClA
(0.54) x (2.2) x (2.8) =
(0.68) x (4.0) x (2.8) =
0.54
0.68
TIME OF CONCENTRATION
T1 = SHEET FLOW, 300 FT @ 40%.
Tl (10 ,j = (1.1 - 0.88) x Length ^1/2 / S ^,t/3
T1 (100 yr) = (1.1 - 0.89) x Length ^1/2 / S ^1/3
) ,"- sHALLow FLow, sso,@ 40%
Vl0 = 1.49 / N x (A/P)^ 2/3 x S^ 1t2
Vl00 = V'|0
T2 (10 Yr) = 550' / 11.76fps x 60
T2 (100 Yr) = 550' / 11.78fps x 60
TOTAL Tc10 = 13.0 + .8 =
TOTAL Tc100 = 9.8 + .8 =
INTENSIW( I ) =
110=
ll00=
PEAK FLOW RATE (A )
13.07 min.
9.E2 min.
11.78 fps
11.78 fps
0.78 min.
0.78 min.
13.E min.
10.6 min.
!!in.lhr.
4.0 in./hr.
3.34 cfs
7.63 cfs
Ql0=
Ql00=
MIDDLE CREEKVILLAGE
RATIOML METHOD
TOTALAREA =
C1-PVMT&BLDG
C2 - FOREST
Cl0 =
Cl00 =
2.6 AC
1.3 AC
C10 = 0.88 C100 =0.89
1.5 AC
C10 = 0.25 C100 = 0.50
(0.88 x 1.3) + (0.25 x,1.51 1 2.8
(0.89 x 1.3) + (0.50 x 1.51I 2.8
Job No. 1039
By: GKM
Runoff Coefficient - C
from Table 3-1, Urban Drainage
Runoff Coefficient - G
from Table 3-1, Urban Drainage
n = 0.025
Np=6113 - 12Wrc.5U
s = 0.11
Intensity (l) from
Town of Vail IDF curves
8t21tO1
WEST DRAINAGE AREA. DEVELOPED CONDITIONS
0.54
0.68
TIME OF CONCENTMTION
Tl = SHEET FLOW, 300 FT @ 40%.
Tl (10 yr) = ('1.1 - 0.88) x Length ^1/2 / S ^1/3
T1 (100 yr) = (1.1 - 0.89) x Lengrth ^1/2 / S ^1/g
Or, - sMLLow FLow, 550,@ 40%
V10 = 1.49 / N x (A/P)" 213 xS 1t2
V100 = V10
T2 (10 Yr) = 550' / 11.78fps x 60
T2 (100 Yr) = 550' / 11.78fps x 60
TOTAL Tc10 = 'l!.Q + .g =
TOTAL Tc100 = 9.8 + .B =
INTENSITY(l)=
ll0=
ll00=
PEAKFLOWRATE(a)Q=GlA
(0.54) x (2.2) x (2.8) =
(0.68) x (4.0) x (2.8) =
13.07 min.
9.E2 min.
1 1.7E fps
11.78 fps
0.78 mln.
0.78 min.
13.6 min.
lo'e m'
2.2,n.|hr.
4.0 in./hr.
3.34 cfs
7.63 cfs
Q10=
Q100=
MIDDLE CREEK VILLAGE
RATIONAL METHOD
TOTAL AREA =
C1 - FOREST
C2-PVMT&BLDGS
C10 =
G100 =
14.7 AC
12.0 AC
C10 = 0.25 C100 =
2.7 AC
C10 = 0.88 C100 =
(0.25 x 12.0) + (0.88 x 2.71174.7 =
(0.50 x 12.0) + (0.89 x 2.71114.7 =
Q=GlA
(0.37) x (2.1) x(14.7) =
(0.57) x (3.9) x (14.7) =
Job No. '1039
By: GKM
Runoff Coefficient - C
from Table 3-1, Urban Drainage
n = 0.05
Np= 5111 - 10'l/l/x0.5u
s = 0.66
n = 0.013
A/p = 3.5/14.5 - 14'Wx0.5'd
s = 0.09
Intensity (l) from
Town of Vail IDF curves
Et22t01
EAST DRAINAGE AREA - DEVELOPED CONDITIONS
0.50
0.89
'17.21 min.
12.38 min.
14.27 tW
1.1 min.
1.1 min.
13.n rps.
0.6 min.
0.6 min.
18.9 min.
14.1 min.
0.37
0.57
TIME OF CONCENTRATION
T1 = SHEET FLOW 300 Ff @ 40o/o.
Tl (10yr) = (1.1 -0.37) xLength^1/2/S^1/3Tl (10014 = (1.1 . 0.57)xLength^1/2/S ^1/3
T2 = SHALLOW FLOW, 950 FT @ 66%.
10'wtDE, 0.5'DEEP
Vl 0 & V100 = 1.49tn x (A/P)^.67 x S^.5
Vl 0 & V100= 1.491n x (5/1 1)^.67 x .66^.5
T2 (10 Yr) = 950 / 14.3 x 60
T2 (100 Y0 = 950 / 14.3 x 60
T3 = CHANNEL FLOW, 500 FT @ 9Yo.
CURB & GUTTER - 6" DEEP, n = 0.013
V10 & V100 = 1.49/n x (NP)^.67 x S^.S
V10 & v100 = 1.49/0.013 x (3.5/14.5)^.67 x.09^.S
T3 ( 10 Yr) = 500 / 13.3 x 60
T3 4100 Yr) = 500 / 13.3 x 60
TOTAL TclQ= 17.2 + 1.'t + 0.6 =
TOTAL Tc100 = 12.4 + 1.1 + 0.6 =
INTENSITY(l) =
110=
I100 =
2.1 in.lhr.
3.9 inJhr.
o PEAK FLow R.ArE ( A I
Q l0:
Q100=
11.29 cfs
32.77 cts
ffiflffi
o[vdDtD3 'A1Nn03 3'19V3 ']IVn lE NAII]
M\rtdctcolJ cNV o3s ylv=uls )33uc 3]con - JJ]oA\n =us AJM.tfffi3ud
3Cv']"il )3AJC ilOOn
IT'Ef
i!l
6 A L'
!frHlt H-
O
LJ
.
(/)
--r--
t/
{
\il
!
I
!
I
I
I
i
i
I
I
'
i
ii
ril
1\
'ii
,t
,ii
i\i
1l
il
ti
,i
ii
I
I
I
;
:
!
I
il
rl
ii
ti
i)
li.
ii
iii
lrl
i!
WW
ffiMffi
ffi ry
Mruru
't. - ,//:-'-'-- / /-..'t-..//
!v'r.'',',i,"'/ /,1
Y|i
,I,
N
\il
7 \,1. ;:/ l"i' \.ri.:::
.---i).a-,..'/
ir .fa-
I i r'-'
ti\rv
l,i)o ICoU'.tv'.10 ve 0ny r.r3 Slic d:l,Nrvuc\0np16g6;1a1r5 IIaE urUr,t\ :d
I
tl
$J
I
eo
4
5
"f)
4
o/)-
I
It
6
qJ
L
-J_It{
t.t-
^-, :
-d-
o
E
Hvdraulic Calculations
Hd#
00vt0-r03 'I1NnE3 3'19V3 'lIVn JD NAoL
N\rld
=lgVMVHCI
-TVru/€CNOC - rUO !n
=USl
AHVMnf'Erud
3CVT]| )33UC
=nOCH
rl'gi
rHgg;
H-
(f
O
tl
nI
v)
-/F
/i
I
!
!
, !.1
it,'tiltliW
,.,'Q),:.
li,ll'ili
riii
ii/l,
W,,WI
'ffi*
Yn
r'r)g I00z39E:gy p7 Dny r.r; 9M0'l9vNlvu0\6rpq6g6yqa1rg ttae ulell\:a
MIDDLE CREEK VILLAGE
HYD RAU LI C CALC U LATIO N S
INLETS: SUMP CONDITION
Use D&L l-3386 Grate
Open area =2.5 sf
Ponding Depth = 0.5 ft
(=
c-
0.7 (30% clogged)
0.6 entrance loss coef.
8l2UO1
ORIFICE EQUATION - V = C x (2gh)^1/2 and Q = KVA
[ = 3.4 fps
Q=
West Drainage Area - Q10 = 3.4 cfs, Q100 = 7.6 cfs
2 - lnlets (one on each side of Mt. Bell Road - 6 cfs X 2 -- 12 6s
East Drainage Area - Q10 = 1 1.3 c'fs, Q100 = 32.8 cfs
2 - lnfets (one on each side of Mt. Bell Road - 6 cfs X 2 = 12 6s
6.0 cfs
Qtoo- oh /
&,, - olc n
sj'-i It -,,i .t
g-*i r*'o
#i
WI
€t
Appx. Wt. 91 lbs.
_f'o'
'l
II \/4',
__l
" t-3?s4 Side Inlet Gatch Basin Frame
and Cover
t-
EI
€t
€,r
6)
Appx. W.590 lbs.
Available with:
3t l/2.
€ d_lr-;.----iE+-)offi
lr-..";=l
€)
€l
€
€)
€l
e
€t
a
e
€)
Catalog No. Type of Grate Total Tvoe of Grate Totall-3440 2 Sided Concave 340 l-3446 3 Sided Flat 3602 2 sided Flat 340 l-3448 4 Sided Concave 380
3 Sided Concave 360 l-3450 4 Sided Flat 380
Dtp*YJ
Table
Rating Table for Circular Channel
Project Description
Project File
Worksheet
Flow Element
Method
Circular Ghannel
Manning's Formula
e.fm2
Solve For Discharge
Constant Data
ManningsCoefficient 0.010Depth 1.30 ftDiameter 18.00 in
Maximum Increment
Rating Table
0.005000 0.050000 0.005000 fuft
Velocity
Channel
Channel
Slope
0.005000
0.010000
Minimum
Discharge
0.015000
0.020000
0.025000
0.030000
0.035000
0.040000
0.045000
0.050000
10.09
14.26
17.47
20.17
22.55
24.70
26.68
28.53
30.26
31.89
6.20
8.77
10.74
12.40
13.86
15.18
16.40
17.53
't 8.59
19.60
oal2zol
04:43:52 PM
FlowMaster v5.15
PagE 1 of 1Haestad Methods. lnc,37 Brookside Road \ Iaterbury, CT 06708 (203) 755-1666
Table
Rating Table for Circular Channel
O
Project Description
Project File
Worksheet
Flow Element
Method Manning's Formula
e.fm2
Rating Table
Solve For Discharge
Gonstant Data
ManningsGoefficient 0.010
Depth 1.75 ftDiameter 24.00 in
lnput Data
Minimum Maximum lnGtement
Channel Slope 0.005000 0.050000 0.005000 fr/ft
21.85 7.50
30.90 10.60
13.70 14.99 u sE 2f" c ( 'Soh Nia'48.86 16.76
53.52 18.36
57.81 19.83
61.80 21.20
65.55 22.19
69.09 23.70
g:yiU ii.U ii:ii rr rr,,"= tg,+ ;. -{J.
Channel
Slope
0.005000
0.010000
0.020000
0.025000
0.030000
0.035000
0.040000
0.045000
0.050000
oar22n1
04:42:53 PM
FlowMasler v5.15
Page I ot IHaeslad Method6, Inc. 37 Brookside Road \ Aterbury, CT 06708 (203) 755-1666
Ab h.rrlPr-f.ih.
Land Title Guarantee Gompany
CUSTOMER DISTRIBUTIOTI
Date 08-27-2001
Property Address:
USWEST PARCEL
Our Order Number: VC27U36
PEAKLAND SURVBYING
IOOO LIONS RIDGB I,oOP
vAtL, co 81657
Ath: BRBNT BTOGS
Phone: 970-4?6-86,+4
Fax: 970-476-8616
Sent Via Fex
Form DEUVERY
land Title Guarantee Gompany
YOUR COTITACTS
Date 08-27-2001
Property Address:
USWEST PARCEL
Buyer/Borrower:
TO BE DETERMINED
Our Order Number: Ve72436
Seller/Owner:
T}M MOUNTAIN STATES TELEPHONE AND TELEGRAPH COMPANY, A COLORADO CORPORATION, AS
TO PARCEL I
TOWN OF VAIL. A MUNICIPAL CORPORATION, AS TO PARCEL 2
If you have any inquiries or require further assistance, please contact one of the numbers below:
For Closing Assistancer For Title Assistance:
Vail Title Dept.
Roger Avila
IO8 S. FRONTAGE RD. W. NO3
P.O. BOX 357
VAIL, CO 81657
Phorc:970-476-2251
Fax: 970-476-4534
EMail: ravila@ltgc.com
Need a map or directions for your upcoming closing? Check out Land Tifle's web site at www.ltgc.com
for directions to anv of our 40 ollice locations.
ESTIMATE OF TITTE FEES
Information Binder $17s.00
TOIAT $17s.00
FoTm CONIACT THANK YOU FOR YOUR ORDER!
Chicago Title Insurance C,ompany
ALTA COMMITMENT
Schedule A
OurOrderNo. YC272436
Cust. Ref.:
Property Address:
USWEST PARCEL
1. Effective Date: April 26, 2@l at 5:00 P.M.
2. Policy to be Issued, and hoposed Insured:
Information Binder
Proposed Insured:
TO BE DETERMINED
3. The estate or interest in the land described or referred to in tbis Commitment and covered herein ls:
A Fee Simple
4. Title to the estate or interest covercd herein is at the effective date hereof vested in:
THE MOUNTAIN STATES TELEPHONEAND TELEGRAPH COMPANY, A COLORADO CORPORATION, AS
TO PARCEL I
TOWN OF VAIL. A MUNICIPAL CORPORATION. AS TO PARCEL 2
5. The land referred to in this Commitment is described as follovs:
SEE ATTACHED PAGE(S) FOR LEGAL DESCRIPTION
Our Order No. VC27Z36
tEGAt DESCRIPTION
PARCEL 1
A TRACT OF LAND IN THE SOUTHEAST ONE-QUARTER, SOUT}IEAST ONE.QUARTER, SECTION 6,
TOWNSHIP 5 SOUTH, RANGE 80 WEST OF THE 6TH P.M., EAGLE COUNTY, COLORADO, MORE
PARTICIJLARLY DESCRIBED AS FOLLOWS:
BEGINNINGAT A POINT BEING 1I7O.2O FEET NORTH 36 DEGREES OI MINUTES 25 SECONDS
WEST FROM THE SOUTHEAST CORNER OF SECTION 6, TOWNSHIP 5 SOUTH, RANGE 80 WEST OF
THE 6TH P.M.; THENCE NORTH 00 DEGREES 00 MINUTES 180.11 FEET; THENCE NORTH 88
DEGREES 34 MINUTES WEST 143.67 FEET; THENCE SOUTH 60 DEGREES 09 MINUTES WEST
107.00 FEET: THENCE SOUTH 26 DEGREES 17 MINUTES WEST 32.25 FEET; THENCE SOUTH
88 DEGREES 30 MINUTES WEST 120.00 FEET; TIIENCE SOUTH 36 DEGREES 23 MINUTES 30
SE@NDS WEST 65.24 FEET; THENCE SOUTH 83 DEGREES 36 MINUTES 30 SECONDS EAST
4TI.93 FEET TO THE POINT OF BEGINNING, COUNTY OF EAGLE, STATE OF COLORADO,
TOGETHERWITH AN EASEMENT FORACCESS TO AND EGRESS FROM THEABOVE-DESCRIBED
TRACT BY PEDESTRIAN, VEHICULAR, AND MOTOR TRAFFIC, FOR AERIAL AND BURIED
TELEPHONE AND ELECTRIC POWER LINES AND FOR BURIBD WATER, SEWER, GAS, AND OTHER
UTILITIES TO SAID TRACT OVERAND ACROSS THE FOLLOWING DESCzuBED PROPERTY, TO
WIT:
A TRACT OF LAND IN THESOUTHEAST ONE-QUARTER, SOUTHEAST ONEQUARTER, SECTION 6,
TOWNSHIP 5 SOUTH, RANGE 80 WEST OF THE 6TH P.M., EAGLE COUNTY, COLORADO, MORE
PARTICUT-A,RLY DESCRIBED AS FOLLOWS:
BEGIMNNGAT A POINT BEING II7O.2O FEET NORTH 36 DEGREES OI MINUTES 25 SECONDS
WEST FROM THE SOUTHEAST CORNER OF SECTION 6, TOWNSHIP 5 SOUTH, RANGE 80 WEST OF
THE 6TH P.M.; THENCE SOUTH 00 DEGREES 00 MINUTES 40.25 FEET; THENCE NORTH 83
DEGREES 36 MINUTES 30 SECONDS WEST 382.48 FEET; THENCE SOUTH 15 DEGREES 49
MINUTES WEST 88.18 FEET TO TIIE NORTH RIGHT OF WAY LINE OF INTERSTATE 70; THENCE
NORTH 74 DEGREES 21 MINUTES 35 SECONDS WEST 4O,OO FEET ALONG THE NORTH RIGHT OF
WAY LINE OF INTERSTATE 70: THENCE NORTH 15 DEGREES 49 MINUTES EAST 122.20 FEET;
THENCE SOUTH 83 DEGREES 36 MINUTES 30 SECONDS EAST 41I.93 FEET TO THE POINT OF
BEGINNING. COUNTY OF EAGLE, STATE OF COLORADO.
NOTE: THE FINAL POLICY DOES NOT IN ANY WAY GUARANTEE OR INSURE THE DIMENSIONS
OF THE ABOVE DESCRIBED LAND, THE LEGAL DESCRIPTION IS DERIVED FROM THE CHAIN OF
TITLE AND ONLY AN ACCURATE SURVEY CAN DETERMINE THE DIMENSIONS.
PARCEL 2
A TRACT OF LAND IN THE SOUTH HALF OF THE SOUTHEAST QUARTER, SECTION 6,
TOWNSHIP 5 SOUTH, RANGE 80 WEST OF THE 6TH PRINCIPAL MERIDIAN, EAGLE COUNTY,
COLORADO, MORE PARTICULARLY DESCRIBED AS FOLLOWS:
BEGINNING AT A POINT THAT IS N OO DEGREES 28 MINUTES 16 SECONDS W A DISTANCE OF
686.60 FEET FROM THE SOUTHEAST CORNER OF SECTION 6, TOWNSHIP 5 SOUTH, RANGE 80
WEST OF THE 6TH PRINCIPAL MERIDIAN, BEING THE TRUE POINT OF BEGINNING;
ALSO BEING A POINT ON THE NORTHERLY RIGHT OF WAY OF INTERSTATE 70;
THENCE N OO DEGREES 28 MINUTES 16 SECONDS W ALONG THE EAST LINE OF SAID SECTION
Our Order No. VC222436
TEGAL DESCRIPTIOIU
6 A DTSTANCE OF 633.40 FEET;
THENCE N 89 DEGREES 27 MINUTES 2I SECONDS W A DISTANCEOF 2633,76 FEET TO A
POINT ON THE EAST BOUNDARY LINE OF VAIUPOTATO PATCH FILINCT;
THENCE S OO DEGREES 07 MINUTES 12 SECONDS E ALONG SAID EAST BOUNDARY LINE A
DISTANCE OF 35I.21 FEET TO A POINT ON A CURVE. SAID CURVE ALSO BEING ON THE
NORTHERLY RIGHT OF WAY OF INTERSTATE 70;
THENCE ALONG SAID NORTHERLY RIGHT OF WAY ON THE FOLLOWING 8 COURSES:
I) A DISTNACE OF 204.62 FEET ALONG THE ARC OF A CI.]RVE TO THE RIGHT, SAID CURVE
HAVING A CENTRAL ANGLE OF 02 DEGREES 56 MINUTES 18 SECONDS, A RADIUS OF 3990.0
FEET, AND A CHORD BEARING N 85 DEGREES 31 MINUTES IO SECONDS E A DISTANCE OF
204.60 FEET;
2) N 80 DEGRSES 13 MTNUTES 06 SECONDS E A DISTANCE OF 211.80 FEET;
3) N 84 DEGREES 55 MINUTES 50 SECONDS E A DISTANCE OF 319.70 FEET;
4) S 79 DEGREES 56 MTNUTBS 28 SECONDS EA DISTNCE OF 424.40 FEET;
'
S 69 DEGREES 55 MINUTES 21 SECONDS E A DISTANCE OF 303,20 FEET;
6) S 74 DEGREES 2l MINUTES 35 SECONDS E A DISTANCE OF 204.70 FEET;
7) S 83 DEGREES 36 MINUTES 29 SECONDS E A DISTANCE OF 826.30 FEET;
8) S 71 DEGREES 33 MINUTES 45 SECONDS E A DISTANCE OF 196.T0 FEET TO THE TRUE
POINT OF BEGINNING, COUNTY OF EAGLE, STATE OF COLORADO.
EXSEPT THAT PORTION OF LAND DESCRIBED IN WARRANTY DEED, RECEPTION I I4OIO, BOOK
2I8, PAGE 4I9, FILED OF RECORD IN THE OFFICE OF CLERK AND RECORDER OF EAGLE
COUNTY, COLORADO,
NOTE: THE FINAL POLICY DOES NOT IN ANY WAY GUARANTEE OR INSURE THE DIMENSIONS
OF THE ABOVE DESCRIBED LAND, THE LEGAL DESCRIPTION ]S DERIVED FROM T}IE CHAIN OF
TITLE AND ONLY AN ACCTJRATE SURVEY CAN DETERMINE THE DIMENSIONS.
ALTA COMMITMENT
ScheduleB-Sectionl
(Requirements) Our Order No. VC272436
The following are the requirements to be complied with:
Item (a) Payment to or for the account of lhe grantors or nongagon of the full consideration for the estate or
interest to be insured,
Iterr (b) Proper instrument(s) creating the estate or interest to be insured must be executed and duly filed for record,
to-wit:
Item (c) Payment of all taxes, charges or assessments levied and assessed against the subject premises which are due
and payable.
Item (d) Additional requirements, if any disclosed below:
THIS COMMITMENT IS FORINFORMATION ONLY, AND NO POLICY WILL BE ISSUED
PURSUANT HERETO.
ALTA COMMITMENT
Schedule B - Section 2
@xceptions) Our Order No. VC212436
The policy or policies to be issued will contain exceptions to the following unlecs the same ane disposed
of to the satisfaction of the Company:
1 . Rigbts or claims of parties in possession not shown by the public records.
2. Easements, or claims of easemcnts, not shown by the public records.
3. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, and any facts which a correct survey and
inspection of the premises would disclose and which are not shown by the public records.
4. Any lien, or right to a lien, for services, labor or material theretofore or hereafter furnished, imposed by law and
not shownby the public records.
5. Defects, liens encumbrances, adverse claims or other matters, if any, created, first appearing in the public records or
attaching subsequent to the effective date hereof but prior to the date the proposed insured acquires of record for
value the estate or interest or moftgage thereon covered by tttis Commitment.
6. Taxes or specid assessments which are not shown as existing liens by the public recotds.o the Treasurer's offrce.
7. Liens for unpaid water and sewer charges, if any..
. In addition, the owner's policy will be subject to the mortgage, if any, noted in Section I of Schedule B hereof.
9. RIGHT OF PROPRIETOR OF A VEIN OR LODE TO EXTRACT AND REMOVE HIS ORE
THEREFROM SHOULD THE SAME BE FOUND TO PENETRATE OR INTERSECT THE PREMISES
AS RESERVED IN UNITED STATES PATENT RECORDED MAY 24, 1904, IN BOOK 48 AT
PAGE 503.
10. RIGHT OF WAY FOR DITCHES OR CANALS CONSTRUCTED BY THE AUTHORITY OF THE
UNITED STATES AS RESERVED IN UNITED STATES PATENT RECORDED MAY 24, 1904,
IN BOOK 48 AT PAGE 503.
I I. WATER AND VTATER RIGHTS, DITCH AND DITCH RIGHTS.
12. RIGHT OF WAY 40 FEET IN WIDTH AS DESCRIBED IN CONDEMNATION FOR RIGHT OF WAY
AWARDED TO THE UNITED STATES OF AMERICA IN INSTRUMENT RECORDED AUGUST 12,
1935 IN BOOK 116 AT PAGE 349.
13. RIGHT OF WAY AS GRANTED TO THE STATE OF COLORADO IN INSTRUMENT RECORDED
JUNE 8. 1940 IN BOOK I27 AT PAGE 466.
I RIGHT OF WAY AS GMNTED TO THE FLEMING LUMBER AND MERCANTILE COMPANY IN
-
ALTA COMMITMENT
ScheduleB-Section2
@xceptions) Our Order No. VC272436
The policy or policies to be issued will contain erceptions to the following unless the same are disposed
of to the satisfaction of the Company:
INSTRUMENT RECORDED JANUARY 13,I943IN BOOK 127 AT PAGE563.
15. RIGHT OF WAY EASEMENT AS GRANTED TO GAS FACILITIES, INC. IN INSTRUMENT
RECORDED FEBRUARY 17, 1966 IN BOOK I92 AT PAGE I49 AND IN BOOK I92 AT PAGE
16I AND RECORDED MARCH 9. 1966 IN BOOK 192 AT PAGE 203 AND AT PAGE 207.
16. EASEMENTAS GRANTED TO VAILWATERAND SANITATION DISTRICT IN INSTRUMENT
RECORDED APRIL 7, 1966 IN BOOK I92 AT PAGE 365.
17. TERMS, CONDITIONS AND PROVISIONS OF NONEXCLUSIVE UNDERGROUND R]GHT OF WAY
EASEMENT AS GRANTED TO HOLY CROSS ELECTRIC ASSOCIATION, INC. RECORDED JUNE
08, 1994 IN BOOK 642 AT PAGE344.
18. EXISTINGLEASESAND TENANCIES.
LAND TITLE GUARANTEE COMPANY
DISCLOST'RE STATEMENTS
Note: Pursuant to CRS l0-l l-122, nonce is hereby given that:
A) The subject real property may be located in a special taxing district.
B) A Certificate of Taxes Due listing each taxing jurisdiction may be obtained from the County
Treasurer's authorized agent.
Q The information regarding special districts and dre boundaries ofsuch districrs may be obtained from
the Board of County Commissioners, the County Clerk and Recorder, or the County Assessor.
Note: Effective $ptcrnber l, 1997 , CRS 30-10406 requires that all documents received for recording or filing
in the clerk and recorder's office shall contain a top margin of at least one inch and a left, right and bottom
nurgin of at least one half of an iuch, The clerk and recorder may reflise to record or file any document that
does not conforrL except that, the requirement for the top margin shall not apply to documenls using fonns
on which space is provided for recording or filing information at the top margin of the document.
Note: Colorado Division of Insurance Regulations 3-5-l , Paragraph C of Article VII requires that "Every
title entity strall be responsible for all rnatters which appear of record prior to the time of recording
whenever the title entity conducts thc closing and is responsible for recording or filing oflegal
documents resulting from the transaction which was closed". Provided that Land Title Guarantee
Company conducts the closing of the insured transaction and is responsible for recording the
legal documents ftom the transaction, exceptiotr tnunber 5 will not appear on the Owner's Titlc
Policy and the knders Policy when issued.
Note: Affirmative mechenic's lien protection for the Owner rnay be available (typically by deletion
of Exception no. 4 of Schedule B, Section 2 of the Commitment from the Owner's Policy to be
issued) upon compliance with the following conditions:
A) The land described in Schedule A of this commitment mu^st be a single f'amily residence which
includes a condominium or townhouse unit.
B) No labor or materials have been fumished by mechanics or material-men for purposes of
con^struction on the land described in Schedule A of ttris Cornmitment within the past 6 months.
Q The Company must receive an appropriate affidavit indemnifying the Company against un-filed
mechanic's and material-men's liens.
D) The Company must receive payment of the appropriate premium.
E) If there has been construction, improvements or rnajor repairs undertaken on the property to be purchased
within six months prior to the Date of the C.ommitment, tlle requirements !o obtain coverage
for unrecorded liens will include: disclosure of certain corlsffuction infonnation; tinancial information
as to the seller, the builder and or $te contractor; payment of the appropriate premium fully
executed Indenrnity Agreements satisfactory to the company, and, any additiorul requirements
as may be necessary after an examination of ttre aforesaid iniormation by the Company.
No coverage will be given under any circum.stances for labor or material fbr which the insured
has contracted for or agreed to pay.
Note: Pursuant to CRS l0-1 l-123, notice is hereby given:
A) That there is recorded cvidence that a mineral estate has been severed, leased, or otherwise
conveyed from the surface estate and that fiere is a substantial likelihood ttrat a third party
holds some or all interest in oil, gas, other minerals, or geothenrul energy in the property; and
B) That such mineral estate may include the right to enter and use the property without the
surfbce owner's permission.
This notice applies to owner's policy comrnitnents containir4 a rnineral scverallce instrumcnt
exoeption, or exceptions, in Schedule B, Seotion 2.
Nottring hcrein contained will be deemed to obligate thc conrpany to provide any of the coverages
ret'erred to herein unless the above conditions are fully sadstied.
Form D I SCLOSURE
b
hhE
14
I
t,
H
I
a
I
.E$
I
I
E
ffiffi
il
$H
t#
ti
!t
!i
!iIt
!t
ll$
illi
ll
t!ilfifffi
fIa
E
H
{Fte
H
F!9)
F-sEl
ES
sq€o
Aa f.l
- $t;ri*
lxs
$;;il:3
o,SL-r {it L-,a ltt 3d5DiEP
R-.
6S
\
s
st4
FCs
F
a
RI
tsIt
*r-la !r
HF
\'
a
fe
F
s
$
14
F
Eo
cs
I
I
,!i,,iiii!i!tflllt
iliilfliii
I
,irll!+t
!ti !l
iriioF6a
!i
aocaa
t
iii
li!
/t
L
tifii@l
\--===5
e
(i
a
g
EaE|i1C
c-
Ee
5
I
ilI:
!ir!Ittl
iiIta
hl
ill
?lc
hl
i|l
!trl
Ii
il*li
@
c:
b
h
n.E'r| u2llII
ilJ-.
ll rl
-ll ltil-
tlll
tt
llJ
,_-igir!fir|*.-
':f{,"l
irv
ii
i!EIs
EI
{t
ts
Rs
F
x
aa
ql
F.o
EQ
t..X
,.$Hs rb
$"ge\T ilE
Flss
"$;;3H:tJo Sl*E 6R6SEF
\ H.$ol
= t.
Sts
EEu2g
\*E{
IA
9{
F
fqo
$
U)
lrr
E
Eo
kcs
$
tt
Jli
..=, $i3
Wi
rrrilt - rns tortt lBf |.''
I-I
I
*rr-&' sFzdrrt - u
(rowN oF valL)
BJ-r. r-gl r
ara-tIc
{Eq
ffI
-lttaf, l rip I oon eF33
ot
b
02
teF;
[r
ll
It
il
sdd|o.
tE
:-t
5E I
EEI
trsrl
=?
iI
eEllI
r.: oEEE5
fr
F
xt/J '\-
hE\.otse\rF \
.r4 -\, E8 r[
$ rb siliF- 3e 'iqFr e-
eF Et
N r{r . ---Fr Et
IH;;Sil:t
*e H!qS FH\ R'-.q r.l
S doi
n l-
Rtsptat
\*I
ia
F
f..o
:R'
V1
ra
F
3
ttcF
^r <_iF:
;R
,f9
FFs
gs
3
l'Ittls,lIIIEltt ll
I ciIitu
I f:,'.,
s i:i:I :a:..I i,,,,a,,
al'/ !i",|tit ;:,:::.::;ltrl
Ei
o
o
o
6. l!
t
:
at
f
I
b
&k
H
IIt
li
!iln'
I
Iltlr
,il
l,ll l
I l;i I
!
E
l:'
I
I
llil
llllffi
li
!!
ii
!ft
:I:t
I
illi!
iir
llrlrlll
JII
rht
!Nt
t
I
I
!J
$lfi
ffiffi
I
I
!
I
II
I
I
I
It
,!liE:Jiiill
iih !i
I
ItI
I
It
I
I
n
b
fi
il
ffsl
I
I
aII
iIrll
iltl
!tii
I
il
f,
I
t
III
i*[
E
I
il' l,li
llii,H
I
li
iiilillriIlfrt:r =lid El!H :llt
F
x
a
ififfiffi
qa
F*G
ir. qss
&o
F$
$ il
*s Ei
SHHI.s
Fi* .;3
Ft
H=rri I
\fit
V2
h
F
\G
s
U2
FI
F
Ls
Rcs
o
o
o
a
b
a
arb
!a
%q// i*
:l
.tl .t<J
dHttl
ll
@
i!
F
t
E
tt
i
t
I
I
I
!
I
I
I
i
I
I
I
r I ir 1
r|l ihl
fl iilr
al
$
il
ri
,! li
iii-it
-sl
ri
3itll
? !l ?I a ;i I 1
iiiiiu!
\/
:1t
oq
ilo{s()
t{a
€
FII
{*
E
R
E
F
Tv)
Lr
FFI
c'
h(A
F
i$ii.EFs
F r..tso
Hr!/js
\
a
3rt
E
ho
\R
aA
Hti
qe
Fqx
I
irl
iii
i;:fi!
iii
iF[
!t:!
!i
ItI
ii
illrl|
I
it
ir
t:
tara$.r - rt.!t cr4t FrrttsEQ
!.I
I
6
@0
F^t58
a
pl
of, |
YFE8
/i lfl
# $lis
iii
iEr
o
o
-rr- Ir!t-.al.(-, cD lr
x
.P/*f
*F
#fr
ft
$
H
h
H
t
$Iis
I
I
$
*hilil*,q
'ffiil
t;a
g'$ ,2il
F{
I
1!rlll I
lir,iiiiiili||rlt;ltii!!
i;lfiiii
i ift iiii
,irillrrto
il
il$f
r -l
i'iiiaa
ocwqloS'IJ,NOOS mCVg
TVA.{O NTOI
f,9YTIIA XUTUC S:ICCil CESOiIOUd
UO,'I SNOLtr'I0NOS CNUSIXS
*:
flr,
[[$fi$l
i$il
t!:q
tii
!l
R
;f'ff
.Fg3
,
t
:t
ii
I
!i
$!tl
I
I
I
fl
'((/(/t///,
!r.J. 'l .lor ! Il
t
II
tl
5
I
I
L
I
I ir
t>
II
t\
III,Ill
l!
$i
ri
:i
o
o
HHI
ocruo103'I.tNrloc meYs
'ItvA d0 NtoI
uoYTrIA xlt8llc s-tq(trn qusoaloud
SIS.LTVIIY Sd€TIS - SNOIJICNOE ENIISIEI
,.!F
I
ll!s
H6l
=!oUIg\l
i ,i
dt-*
ilt
flE$
c)
Et
g.gt
,- F3
gs
e
I
I'iiii
R tti oF vxl
arJ.rrr I
(E ur|l'rIrsaplpof, | -fhe I -eIT I iTER , Ytit{
+- til-
F
x
I^
>{
I
E.
-
o
I
N)9 I00e te:tt:10 te 6nv rJJ 9l{0'dJ-NIYuo\6iip\6€01\alls tlaB urslunoN\:d
totg looe 9t:99:0I ra 6nv lJJ 0t10 l9vNlv80\6 p\6€0l\alls tla€ ulsluno,i\ rd
',;l' - :ll ,. '
tl\.ld =llJSld3ct,l@:tcvTl ):EilJ3:l-1cl(ln
tiili
ii !8,
i#t
IT------ '--T--'
t/t/
a-i
/
II
\I I
I
II
t
I,,It,
Itr
t,
\ t f-'l
i'1,\ i /rrl i il
ttiii! ,
liiti
lit'!i
il
lE
iI
ll
$
Elr!
il
sl
#
r.oj
r
tt
'll
tl
ttfrtlrrye{nr tra
SLf. ArlyJ
Cor.fa.d
Grrffa
Cq.tlt
h
RUG 2A EOA1 13:18 FR ERGLE UR]L Sc s7a 949 32e9 TO 4?68615 P .Al /AI
N, XeelEnergy*
PU'L'C SETYIEE COfiPANY
Tschnician
970-2624070
P, O- BoX 430
Mifit!,rn, Colorado 81646
August 20,200r
Peak Land Consultqdts, lnc.
Alln: Ceorge Mossnan
1000 Lionsridgc Loop
Vail, Colorado 81657
Subjcct: Service Availability
Dear Mr, Mossman:
In accordancc with our rariffs filcd with and apprwed by tro Cdorado Public lftilitics Csnrrission' gu
facilitics oen bc made availabte to sewe yonr pio;cat at Middle Creek Villagc (thc Mournain Bcll Site),
Cugeutly our lead time for design is 4 wecks and lead timc fsr constrsstion is 8 weeks' Ilue to wortloa4
ruarer'ial availability and design tomptexity, de.rign and constnrstion lead timas are approximate and
subjccttochangc. Plcasesubmityourplaasatth€eafli0stopportunitytobefiqrassurqmaetingyour
proposed sghqdule for receiving service.
fit C* costs will be calculsrcd in confornancc rpith or filed SERVICE LATERAL CONNECTION
AND DISTRIBUTION MAIN PffENSION POLTCY,
E gtcctric Costs fur the project will be calsuldcd ia confsmurce with our filcd SERVICE
CONNECTION AND DISTRIBUTION LINE EXTENSION POLICY.
If you have any qucstions or commetrt!, or if I can be of firrthcr assistarce, pleaso call rne af the nrmrber
lisied be'low. i,ty normal work hours are 8:00 a.m. to 5;00 p.m., Mondcy tlrough Friday.
*t< TorRL PFIGE ' 41 t( )t'
cR9js
s50B'
AUG, P3. 2EE1 11 : 4E.RI'1 HOLY CROSS VRIL NO.45e P.?
3799 HIGHWAY 82 ' Ro' DMWER 2150
GLENWOOD SPRINGS, COLORADO 81602
(970) 9,,15-s4?'l ' Fru( (970) 94${001
August 22,2001
Mr.ceorge Mossman
Peak Land Consuttanb, lnc.
| 000 Lions Ridge Losp
Vail, CO 81657
RE: Middle CreekVillage - "Mounraln ftll Siteo
Dear Mr. Mossrnan:
The above mentloned development is within tha c€rtificated servise area of Holy Cross Encrgy.
Hoty Cross En€rgy has existing power facillttes located on or n€ar the above mcntloned project.
These existing faclllties have adequate capacity to provide electric power to thc dcvelopineirt,
subject to the tarrffs, rules and regulations on file. Any power llne cnlargements, relocations,
and new extonsions necessary to deliver adequate power to and withln thc dcvelopment will be
undertaken by Holy Cross Energy upon compictlon of appropriete contractual agreements,
Pleese advlse when you wish to proceed wlth thc developmenr of the electrlc 3yst€m for thisproject.
Sincerely,
HOLY CROSS ENERGY
#M.4
Ted Huskey, t
Engineering SeMce SupeMsor
TH:vw
SeMce Locatlon #5e-65
<7**::,:.*::fl '"::.::::"'-
August zl, zool
(s7o) 476'7480 ' FAx (e7o) 476-408s
o
\
Mr. Jim Ellerbroek
Peak Land Consultants, Inc.
1000 Lionsridge Loop
Vail, CO 81657
subject: Middle creek vi[age Development Ability to serve Letter for water
and Sewer
Dear Jim:
As of August 14, 2001,the Eagle River Water & Sanitation District will provide domestic
water and sewer service to the above-referenced development. The District has excess
capacity to process domestic water and sewer to its constituents at the present time. The
vail wastewater Treatment Plant (vwrP) is currently serving approximately 5607
Single-Family Equivalent (SFE) units. The current design capacity of the vwrp is 7500
SFE units.
Accordingly, upon compliance with the rules and regulations, and the payment of
appropriate tap fees, the District will provide domestic water and sewer service.
Construction for all main line extensions is the responsibility of the developer; however,
all construction drawings must be pre-approved by the District.
If you have any questions or concems please contact the District at 476-7480.
Sincerely,
\*o\.\"r$"-
Fred S. Haslee
Regulations Administrator
c Customer Account File
FSIVmem
:\lswsD\8REcslA,BtLrsRV\FoRtWAffHvtWRSf6FFrufi/.g+CRar oNs & Mrruncever.r SeRvrces N
a-23-O | ; 2:1OF)M;GWEST ENG.
a-23-Ol i 2: OtsPM i ;97O 384 0257 * 1/
€7O476€t6 r 6; tt 2
August 23,2AOl
To whotn it Bay soncertr:
Qwest confrms our ability to serw the proposed she (Mdde creck village) as shoun oD
the 'T-ocation Plan" dated Algust 2q 20ol prcparcd by peak Land Coasultantr, rsc.
Wc r.rnderstand that the ptan/s trarsmittcd arc conoepnral only.
Jrson SftltPtwa{a>ffig\gwu
io.a l'&itgt opda@ro
ffiffi"**"*'