Loading...
HomeMy WebLinkAboutB12-0309 permit issued ,, . _ �,q.�.�� __ �.,� . . _ NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES . y ra�r�v�ti . Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 COMBINATION BLDG PERMIT Permit #: B12-0309 Project #: PRJ12-0145 Job Address: 42 W MEADOW DR VAIL Applied.....: 07/18/2012 Location......: VAIL VILLAGE FIRE STATION Issued. . . : 09/19/2012 Parcel No....: 210107101012 OWNER VAIL FIRE PROTECTION DIST 07/18/2012 PO BOX 100 VAI L CO 81658 CONTRACTOR G.E. JOHNSON CONSTRUCTION 09/07/2012 Phone: 719-473-5321 25 NORTH CASCADE AVE#400 COLORADO SPRINGS CO 80903 License: 128-A ARCHITECT PIERCE ARCHITECTS 07/18/2012 1650 FALLRIDGE ROAD SUITE C-1 VAI L CO 81657 License: C000003130 APPLICANT VAIL FIRE PROTECTION DIST 07/18/2012 PO BOX 100 VAI L CO 81658 Description: REMODEL OF FIRE STATION 2 (VAIL VILLAGE) Occupancy: B Type Construction: Valuation: $1,350,000.00 .............................................................,,.«........,�........ FEE SUMMARY ......,,....,.,...,,.«....,,,,...�......,.......,.......................�.......... Building Permit-----------> $6,886.25 Bldg Plan Check----------> $4,476.06 Use Tax Fee-----------------------> $26,800.00 Electrical Permit---------> $2,645.00 Elec Plan Check-----------> $1,719.25 Restuarant Plan Review--------> $0.00 Mechanical Permit------> $5,320.00 Mech Plan Check---------> $1,330.00 Additional Fees--------------------> 47,770.31) Plumbing Permit--------> $975.00 Plmb Plan Check---------> $243.75 Recreation Fee--------------------> $0.00 Investigation-----------------------> $0.00 Will Call------------------------------> $20.00 TOTAL PERMIT FEES-------------> $2,645.00 Payments-------------------------------> 32,645.00 BALANCE DUE-----------------------> b0.00 x+.+.+.+.swt:�+�,�:�xw,ra+�++��wa,rk��x�.�����wx:��xx��:��+n,�wxxx:xnxx+xwxww�w,e:,rwwwwwxwxw�ww�wxwwww,rxwxanww.,rx+rxwxx++xxwww:wxr.xr+xwxnw+xwxw,�rxxwxwwxwwwww::::w»:s.x:�x�.ww�wx:w:xxw:xxxx�xwx�x DECLARATIONS I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM -4:00 PM. combination permit_012811 � � 1't��V�l �l�IJ�.r , 1r4�R4lRfff4##k#iFkrttrfA'Y'V Yrhf'Y'RfrY'RfYrM*Mr*ffftr*f!l�44444k#!##i(LI�i4lY(4trMi4krtrtY`Y`AY`4rtYrY'hfiftr*#A44#f4L##ii`#RitY4iM4ffit�tfYHH`YlRfiflrYrY'Y`*trfr*f�RiRAxA*4ki�i44444Yitt�k4ikRMfY'RYeY'R4Y'RffrM+4fY�fiiRfiNRR*A4R44+lk* CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF Permit#: B12-0309 Address: 42 W MEADOW DR VAIL Owner: VAIL FIRE PROTECTION DIST Location: VAIL VILLAGE FIRE STATION ............................................................................».�,....,.......,,,.............,.......��,,,....,...,...,...,.............,.,,.,..»...,...,.....,......., Cond: 52 (FIRE 2002) Monitored fire alarm system required and shall comply with NFPA 72 (2002 ed.) and VFES Standards Cond: 53 (FIRE 2007) Monitored fire sprinkler system required and shall comply with NFPA 13 (2007) and VFES Standards. Cond: CON0012710 No trees can be planted along the west property line on top of or within 5'of existing utilities. Cond: CON0012711 Coordinate with PW on the installation of 3' Permanent concrete wall to protect trees from plows at the SE corner of property Cond: CON0012712 All concrete paving in ROW shall be class P. combination permit_012811 ! � ��O� IiitiJ �. wrw*,r*wrw*,t,t+.,+*rw�«rw«r*,rrw«,r*«,rrw�,r,r,r,r*«*:,t,t**r«+rww*«rr+*t�****wr*r*rr***rwrt*,rr***ww,r****r***t,t,t,tw***wr,r,t,r�«*+*wr�*�*w+*r*+**,t,r*+*+a*,rr,tw,rww*+,rw**** REQUIRED INSPECTIONS AND STATUSES Permit#: B12-0309 Address: 42 W MEADOW DR VAIL Owner: VAIL FIRE PROTECTION DIST Location: VAIL VILLAGE FIRE STATION **..*********,,.«*„*.*.�«.«�*„**��*�.,►*���,,.**�**��***�****�****��****.*************.**************.,.,***.,******.*.,**.,**.,***.***,,*�,►��,.*�.,►**.,.**,►*��*** Item: 00010 BLDG-FOOTING Item: 00020 BLDG-Foundation/Steel Item: 00120 ELEC-Rough Item: 00200 MECH-Rough Item: 00220 PLMB-Rough/D.W.V. Item: 00230 PLMB-Rough/Water Item: 00240 PLMB-Gas Piping Item: 00310 MECH-Heating Item: 00030 BLDG-Framing Item: 00050 BLDG-Insulation Item: 00060 BLDG-Sheetrock Nail Item: 00534 PLAN - FINAL C/O Item: 00390 MECH-Final Item: 00290 PLMB-Final Item: 00190 ELEC-Final Item: 00090 BLDG-Final combination permit 012811 :��,..-.��„� �.. . ..._. *��*******++*********++*+**************++****�*+*++*******************+********************* TOWN OF VAIL, COLORADO Statement **�*************************************************************�************************�** Statement Number: R120001378 Amount: $2, 645.00 09/19/201209:43 AM Payment Method: Other Init: LC Notation: INTERDEPARTMENT FUND TRANSFER ----------------------------------------------------------------------------- Permit No: B12-0309 Type: COMBINATION BLDG PERMIT Parcel No: 2101-071-0101-2 Site Address: 42 W MEADOW DR VAIL Location: VAIL VILLAGE FIRE STATION Total Fees: $2, 645.00 This Payment: $2, 645.00 Total ALL Pmts: $2, 645.00 Balance: $0.00 ***********************+******************+�*******+***********�***************+*�********** ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ EP 00100003111100 ELECTRICAL PERMIT FEES 2, 645.00 ----------------------------------------------------------------------------- � � , TOWN OF VAIL . JOURNAL ENTRY FORM FOR MONTH END: Sept 2012 GROUP# JE# PERIOD: 9 7YPE: TF X Debit Credit Description For GL ACCOUNT# PROJE('T TRANSFER OUT TRANSFER 1N Electric fees for Main Vail Fire Stn 110-8010-440-44-00 CBI010 2,645.00 � 001-0000-311-11-00 2,645.00 2 3 4 5 6 7 8 9 10 11 Additional Documentation/Expiana#ion: 12 13 See attached for details 14 15 Intemal charge for elect�ical inspection fees 30 for Maln Vail Fire Station renovation 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 BATCH CONTROL TOTAL 2,645.00 2,645.00 Approved �� Date_9/18/12 Preparer. Kathleen by; _��, Date: � I `Z_ . � Type.COMBQ Ver:201d COM$INaTION BLDG PERMIT Su6-Type:ACOM;Activiry} Pe�m@ N: 812-03�"�'� Addre�c•�42 W MEADOW DR VAII. --` � ' '� . " Sta6uc ,11PPROVED pWNER:V,41L FIRE PRdTECTIp'I�bl$fi�� � ' -- Dab� �7/f8l2012 e�o i ,�{'� ��j � �`�p �� (]K � � �r �,�"°'� M� � �� LiNK $date 6oraen �es� 7C�e �mvi Faes pw�� L�� w __ -- -- -- l°j �ee aroce,song tor 612-0309 t �`s�.,� Fee 3ummenr ,� CalculetedFex: 550.415.31 Deta� PaYEWBalence � i �FnAt'�li�nalt� r-1� i s - � ± h Adt6tlonalFeer I347�70.311 Detaaa R�e �' g� TatalFew: . . .52.645.00� Det OveiPqvmeN Pqym°►UO � .�� P��� �(old Pay�nent� Balance; 52.645.00 Fee Loa�' �, ' ,W�HePriM Recaid � � Inolude Tnqt tran�aoporre m Paymant Qatailx Pay Deferred Ehoit Grid E Funds can be transferred to EP 001-0000311-i1-00(electrical permit fees). All other fees have been waived. r t ����� 731 Scarlet Drive ������� Grand Junction, CO : 81502 970-242-5776 e Initial Start Up&fnstaliation Review Project#: Dafe: 03/14/13 WO#: 52442 End User/Owner: VAIL FIRE DEPT. Contact: Phone: Contractor/Sold To: Contact: Phone: Generator Set Manufacturer ONAN ' Model Number: DSFAA Spec No: E Serial No: K 120424038 Engine Manufacturer CUMMINS Model Number: QSS5-G3 CPL No: 1100 Serial No: 73472989 Transfer Switch Manufacturer ONAN #1. Model/Spec.#: OTECA=A Serial#: K 120418836 ATS ID : 1207073 #2. Model/Spec.#: Serial#: ATS ID : #3. Mode1/Spec.#: Serial#: ATS ID : #4. Model/Spec.#: Serial# : ATS ID : #5. Model/Spec.# : Serial # : ATS ID : ' Initfal Start-up Dafe: : Type of Fuel: NAT GAS (Natural Gas,LPG Vapor,LPG Liquid,Gasoline,Diesel} Type of Installation: 1NDOOR (Endoor/Outdoor) Type of Cooling: RADIATOR (Radiaior,City Water Heat Exchanger,City Water Standpipe,Remofe Radiator) Cummins Power Generation Warranty initiation Engine/Generator Date: 3/14/2013 Automatic Laad Transfer Date: 3/'f 4/2013 Checkout and Start-up performed by: S7EFFAN GREGERSEN 027380 ' (Signature) Checkout and Start-up performed by: , (Signafure) , Company: crm W itnessed by: (Signature) Company: Initial installation and Prestart Checks FUEL SYSTEM Page 1 ' � ;l��`D�esei _ _. 0 Flexible Fuel Connections (supply & return) � To Engine ❑ Supply Tank � Day Tank � Base Tank ❑ High Level Alarm CI Low Level Alarm CO Rupture Basin Alarm ❑ Other O Day Tank ❑ Low Level Alarm � High Level Afarm ❑ Screen/Filter Assembly ahead of Fuel Inlet � Fuel Transfer Pump and/or So[enoid Valve ❑ Day Tank AC Power from Emergency Panel ❑ Site lnstalled Fuei Piping Proper Material (biack pipe only) ❑ Check Valves on Engine ' ❑ Service Isolation valve in Supply Line to Engine/No vaive in Return ❑ Fuel Return/Overflow Line to Main Tank One Size Larger than Supply � Fuel Level below Injectors � Diesel Fuel Available O Bfeed Diesel ��y�� a��, ��� t������.A��:nua�������z��=���� . ..�� . ��yV�ai�.� '•�_• 4�\•� ' _,... . ~.�e�wz - � Manual Shut Off Valve ❑ Primary Gas Pressure Regulator ❑ Gas Volume Surge Tank ❑ Dry Fuel Strainer ❑ Gas Solenoid Valve 0 Flexible Fuel Cannection � Gas Pressure at secondary Regulator No Load Full L.oad EXHAUST SYSTEM O Rain Cap/Beveled End with Screen � Flexible Exhaust Tubing ❑ Exhaust Condensation Trap ' � Muffler ' CO Correct Exhaust Piping Size O Long-Radius Exhaust Elbows � Exhaust Thimble [nitial Installation and Prestart Checks COOLING SYSTEM Page 2 WY��./ .. ., . ��.�s C] ;Radia#or.Cool�ng ' _ .. . � Unit Mounted ❑ Remote � Add Coolant, Antifreeze, Check Level O Proper Exhaust Ventiiation Duct& Opening � Proper fnlet Ventilation Opening 0 Proper Air Circulation � Check freeze protection level NEG 32 Degrees F ❑ Proper Plumbing to remote Radiator 0 Proper clearance in front of Radiator? ou��ooRS ❑ Surge Tank ��y <�.,� �tnK,.� C4�'�a�:. X�� � e�� <L crc '�;�;.�/',�/ ��..�rry��+=a�,���:�Gd����Si�'_.�:`.������Sk't�:., �1L������.2:._ . p Standpipe ❑Heat Exchanger ❑ Direct ❑ Fiexible Water Lines ❑ Water Solenoid Valve ❑ Water Strainer � ❑ Water Available 0 Proper Air Exhaus# & In1e# Ventilation ❑ Proper Air Circulation GENSET MOUNTING [.� Secured to Leve1 Surface Q Oil Drainage Ciearance � Vibration Isolators Installed Correctly & Adjusted BATTERY � Type & Size 4-D 'i 2VDC � Electrolyte [� Correct Polarity [] Isolated From Floor � System Voltage 12 VDC � Ba#tery Charger Float Voltage 13 VDC ❑ Batter Charger Equalize Voltage VDC GENERAL tNSPECTtON � Mountings � Clearances � Suppor�s lnitia! lnstallation and Prestart Checks ELECTRICAL Page 3 0 Engine Water Jacket Heater Wired ta Normal Source, Voltage 120 VAC O Batfery Charger wired to Normai Source. � Flexible Generator Load canductQrs/Conduits C� DC interconnect wiring complete? � Generator Laad Conducfors Connected Correctly? (Phases & Neutral) � Is Plant Grouncfed? �Yes ❑rvo ,Where EARTH ❑ fs Generator Neutral Grounded (Four Pole ATS/s)? ❑Yes ❑No � Line, Load, & Emergency. Conductors Connected to proper location in ATS? � Akarm Network installed? ❑✓ Yes ❑�o Operational? �Y�S ❑rvo RECOMMENDATION OR MODIFtCATIONS BEFORE PLANT IS STARTED FtRST TIME ❑ Modifications Completed [] OK for Start Up �K for Start Up By : STEFFAN GREGERSEN 027380 (Name) (Signature) START UP 8� CHECK OUT 0 Hoses � Check Oil Level L� Fuel Sofenoid valve Wired to Ignition System � Operator Selector Switch ta Off � Inspect Belt, Fan, Altenator, & Governor D Wiring START AND WARM UP PERIOD (NO LOAD) � ATS Locked out af Emergnecy- Linear Motor Control - Off O Circuit Breaker Open C1 Start Engine (Selector Switch in "Run" Position) O �il Pressure 50 psi. L1-L2 VAC 208 � Water Temperature 175 deg. L2-L3 VAC 208 ; 0 Battery Voltage 14 VDC L1-L3 VAC 208 I� Frequency 60 Hz. � Any oil ar caolant leaks detected? � Unusual NoisesNibrations ❑Yes �r�o C] Check co ntrol voltage caiiEara#ion O Check Low Coolant Leve! Safety Swi�ch Initial installation and Prestart Checks ELECTRICAL CHECK OUT Page 4 f� Generator Main Circuit Breaker Clased [�] Automatic Transfer Switch Set Points ATS ID 1207073 0 0 0 0 Remote Start Wiring Correct CJ ❑ ❑ ❑ � Under Voltage Pickup % of Normal 95 Under Voltage Drop Out % of Pickup 80 Over Volfage Drop Out % of Normal Over Voitage Delay in Seconds Fr�q. Sensing Pickup % of Normal Freq. Sensing Delay in Seconds Utility Voltage Line to Line {VAC) 208 Generator Voltage Line to Line (VAC} 208 Utility Frequency(HZ) 60 Generator Frequency{HZ) 60.'[ Phase Rotation Utility ❑ccw �cw ❑ccw CJ cw ❑ccw ❑cw ❑ccw ❑cw ❑ccw ❑cw Phase Rotaion Generator Ci ccw �cw ❑ccw ❑cw ❑ccw ❑cw ❑ccw ❑cw ❑ccw ❑cw START UP PERtOD (ADD LOAD} 0 Selector Switch in "Run" Position � Add Load by Load Bank - if required AUTOMATIC START � Check Oil & Water Levels � Selector Switch in "Auto" IO Simu(ate Power Failure (Utility,Main Breaker, or Test Switch @ ATS) � Set ATS Time Delays � ATS Linear Motor Switch - ON ENGINEIGENERATOR C.•J Engine Start OK? � Engine & Generatar Under Load OK? � AMPS: Line 1 11 Line 2 5 Line 3 5 fO Voltage: L'f-L2 208 L1-L3 208 L2-L3 208 O Hertz 60 Hz. O Oil Pressure 65 psi. C� Water Temperature 170 deg. ❑ Unusual NoisesNibrations , , . lnitia# instatlation and Prestart Checks AUTOMATIC L.OAD TRANSFER Page 5 ' [�] Transfer to Emergency OK � Return Laad ta Normal (Utility,Main Breaker, or Test Switch @ ATS) � Retransfer to Normal OK 0 Time Delays Times Out Properly O Genset Shut - Down OK ATS ID 1207073 0 0 0 0 Start Time Delay in {sec.) 3 Transfer Time Delay in {sec.) 5 Program Transiton Time Delay (sec.) 0.5 Re-Transfer Time Delay(min.) 10 Cool Down Period (min.) 5 FINAL INSTALLATlON RECOMMENDAT{ONS CUMMINS POWER GENERATION WARRANTY INITIATION Engine/Generator Date: 3/14/2013 Automatic Load Transfer Switch Date: 3/14/2093 CHECKOUT & INiTIAL START-UP Performed BY: STEFFAN GREGERSEN 027380 Performed BY: 0 Witnessed By: 0 Company: 0 PRODUCT TRAINtNG Performed BY: Date : . _ � �a- d ��s 04-01-2013 Inspection Request Reporting Page 17 4:15 qm V�, CO - Citv Of Requested Inspect Date: Tuesday,A ril 02 2013 Site Address: 42 W MEA�OW D�t VAIL VAIL VILLAGE FIRE STATION A/P/D Information Activity: 612-0309 Type: COMBO Sub Type: ACOM Status: CR REQD Const Type: Occupancy: Use: B Insp Area: Owner: VAIL FIRE PROTECTION DIST Contractor: G.E.JOHNSON CONSTRUCTION Phone: 719-473-5321 ��C.� Architect: PIERCE ARCHITECTS � �S Description: REMODEL OF FIRE STATION 2(VAIL VILLAGE) - i` � n , \ , �?�,,� � (J1.� \1 fi 1 �i Requested Inspection(s) —�'� � �����.� y�t,� �,�✓`� / �1''� �-i_. Item: 534 PLAN--FI#AtL'l�'1 ��l(.�� " Requested Time: 08:00 AM Requestor: G.E.JOHNSON CONSTRUCTIOfJ" Phone: 719-473-5321 Comments: 470-9368 ! ( a• � :i Assigned To: BGIBSON f Entered By: JMONDRAGON K Action: Time Exp: Item: 539 PW-FINAL C/O Requested Time: 09:00 AM Requestor: G.E.JOHNSON CONSTRUCTION Phone: 719-473-5321 Comments: 470-9368 Assigned To: JMONDRAGON Entere By: JMONDRAGON K � Action: Time Exp: 3-�` � �'j . �i�'�, � U.' L �1 ����r'� j,�� � � -r : { � � i - � �"U�� (� ;�U i i U I�S � , '�� �^�`a � ; f�.SC G� `�n � � `� o�� � d � ��-( v E a✓►� P� � i J� S � ✓� �-f S _ � � � �j ''�?r e r. 1 _/� n / �S�( u�C-t` �✓� -(('✓1 C e, G���.1 ✓� '�/'�t!�/ U'� `�/s-f � I �(l�ua�t.vrl ��< <� � �� c�e ( S �C';mv�cc� (� �,�,i�, Insaection Historv ,_i /� �P( / , ��f=-,�-f,,; Item: 503 PW-Final DrivewayGrade "Approved'* � j ( � C 5P�v ��e � 01/23/13 Inspector: Is Action: AP APPROVED �� Comment: Retaining Wall at Snow Storage Area approvied. �✓�� , 1 Item: 532 PW-TEMP.C/O **Approved* � � ��l�c� 01/23/13 Inspector: Is Action: AP APPROVED � Comment: Retaining wall at the Snow Storage Area approved. � �' Item: 539 PW-FINAL C/O � ���'o Item: 10 BLDG-FOOTING "Approved" 10/03/12 Inspector: sgremmer Action: DN DENIED Comment: need contractor license 10/08/12 Inspector: sgremmer Action: AP APPROVED : /� � Comment: �C 10/10/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION � � ' __ F%,�.{� Comment: retaining wall and pier y 10/30/12 Inspector: sgremmer Action: NR NOT READY FOR INSPECTION / Comment: 11J02/12 Inspector: sgremmer Action: AP APPROVED Jo a � Comment: Item: 20 BLDG-Foundation/Steel "Approved*` 10/08/12 Ins� pector: sgremmer Action: PI PARTIAL INSPECTION Comment: CMU first lift trash inclosure 10/10/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION � Comment: pier � 10/16/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION � ;'! ;(1-� ��6� ��-; Comment: CMU wall north side up to 2nd bond beam � 10/19/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: CMU trash enclosure last bond beam . � 11/07/12 Inspector: s remmer Action: AP APPROVED � Comment: CMU g ' � '�� � � � REPT131 Run Id: 14648 --� I �l� , � i �� � � � 04-08-2013 Inspection Request Reporting Page 16 4 03 nm VaiIrCO itv O� Requested Inspect Date: Tuesday,April 09 2013 Site Address: VAIL VIL AGE F�RE STATION A/P/D Information Activity: 612-0309 Type: COMBO Sub Type: ACOM Status: REVISION Const Type: Occup ancy: Use: B Insp Area: Owner. VAIL FIRE PROTECTION DIST � Contractor: G.E.JOHNSON CONSTRUCTION Phone: 719-473-5321 ! Architect: PIERCE ARCHITECTS � ' ' Description: REMODEL OF FIRE STATION 2(VAIL VILLAGE) � `� ( u,� �,'��''�- Requested Inspection(s) , k�f�✓`' ` � Item: 534 PLAN-FINAL C/O l`� Requested Time: 08:00 AM f � � � Requestor: G.E.JOHNSON CONSTRUCTION Phone: 719-473-5321 / f_ I v1 \ Comments: 470-9368 Entered B JMONDRAGON K Assigned To: BGIBSON Y� Action: Time Exp: Comment: o a wor completed. Paint bollards a garage oors;install landscaping;construction fence removed, Jersey barriers removed;paint,vents to match stucco color and decks;clean up trash on site in the ice;paint the gas meter;paint the electrical service and conduit to match the stucco;Paint EHU exterior entry door; paint roof venting flat black. Item: 190 ELEC-Final Requested Time: 10:00 AM Requestor: G.E.JOHNSON CONSTRUCTION Phone: 719-473-5321 Comments: 470-9368 Entered B JMONDRAGON K Assigned To: JMONDRAGON Y� Action: Time Exp: Comment: rovi e genera or start up test reports watt stopper in office 110 Comment: g�arage and,upper living area only Comment: Tamper resisfant recpts.to be installed Item: 543 PW FINAL Requested Time: 10:30 AM Requestor: G.E.JOHNSON CONSTRUCTION Phone: 719-473-5321 Comments: 470-9368 Entered B JMONDRAGON K Assigned To: JMONDRAGON Y� Action: Time Exp: Comment: . epair sp a on north west corner o ui ing near new tower. 2.Strip ADA Parking spot. 3. Remove all staging area from parking lot. 4.Complete landscaping. 5.Remove silt bags from catch basins. InSpectiOn Historv Item: 503 PW-Final Driveway Grade "Approved" 01/23/13 Inspector: Is Action: AP APPROVED Comment: Retaining Wall at Snow Storage Area approvied. Item: 532 PW-TEMP.C/O Approved"` 01/23/13 Inspector: Is Action: AP APPROVED Comment: Retaining wall at the Snow Storage Area approved. 04/02/13 Inspector: Is Action: AP APPROVED REPT131 Run Id: 14653 I�-� ��S �. 0 , � , 06-2i-2013 Inspection Request Re orting Page 7 4 29 nm Vail CO — Requesteds�te Address: 42 W MEADOW DR VAIL VAIL VILLAGE FIRE STATION �� � N � A/P/D Information C7 '1� Type: COMBO Sub Type: ACOM Status: ISSUED � Activity: B12-0309 Occupancy: Use: B Insp Area: Const�Wype: VAIL FIRE PROTECTION DIST Contractor: G.E.JOHNSON CONSTRUCTION Phone: 719-473-5321 Architect: PIERCE ARCHITECTS Description: REMODEL OF FIRE STATION 2(VAIL VILLAGE) Reauested Insuection(sl ftem: 90 BLDG-Final Requested Time: 04:00 PM Phone: Requestor: Comments: 471-6048 Entered By: MHAEBERLE K Assigned To: JMONDRAGON Tim Exp: Action: Comment: ear exi snowme Comment: make up air in laundry closet 2br ehu 100 sq inches, all I'ife safety completed.exterior plan 'ng and public wor items to be addressed in the spring , ' ` �_ � L!'�l' " Inspection Historv Item: 503 PW-Final Driveway Grade "Approved'' Action: AP APPROVED 01123/13 Inspector: Is Comment: Retaining W all at Snow Sto�age Area approvied. ftem: 532 PW-TEMP.C/O Approved Action: AP APPROVED 01/23/13 Inspector: Is Comment: Retaining wall at the Snow Storage Action prAP APPROVED 04/02/13 In specto r: Is Comment: TCO approved. ftem: 543 PW FINAL ' Approved Action: CR CORRECTION REDUIRED 04/03/13 Insp ector: Is Comment: 1.Repair Asphatt on north west corner of building near new tower. 2.Strip ADA Parking spot. � 3.Remove all staging area from parking lot. 4.Complete landscaping. 5.Remove silt bags from catch basins. 04/09/13 Inspector: Is Action: AP APPROVED , Comment: The Town of Vail is holding money for completion of remaming rtems. Asphalt repair and landscaping. Striping ofthe lotwill also be done by PW. Item: 10 BLDG-FOOTING 'Approved" 10/03/12 Inspector: sgremmer Action: DN DENIED Comment: need contractor license 10/OS/12 Inspector: sgremmer Action: AP APPROVED Comment: 10/10/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: retaining wall and pier � 10/30/12 Inspector: sgremmer Action: NR NOT READY FOR INSPECTION Com ment: remmer Action: AP APPROVED 11/02/12 Inspector: sg Comment: roved" Item: 20 BLDG-Foundation/Steel "APP 10/08/12 Ins� pector:, sgremmer Action: PI PARTIAL INSPECTION - Comment: CMU first Irft trash inc�osure 10/10/12 Inspector: sgremmer Action: PI PARTIAL INSPECTION Comment: pier REPT131 Run Id: 14631 II � t �` U 07-09-2013 In i n p ` spect o Request Re orting Page 4 4:20 qm V�,_S`-� - Citv Ot Requested Inspect Date: Wednesday,July 10,2013 �� Site Address: 42 W MEADOW DR VAIL ���� � VAIL VILLAGE FIRE STATION A/P/D Information �� cr� Activity: B12-0309 Type: COMBO Sub Type: ACOM Status: ISSUED Const Type: Occup ancy: Use: B Insp Area: � Owner. VAIL FIRE PROTECTION DIST � Contractor: G.E.JOHNSON CONSTRUCTION Phone: 719-473-5321 � � Architect: PIERCE ARCHITECTS � Applicant: VAIL FIRE PROTECTION DIST � Commtent� NO BR�AKDOWN OF THE�VALUATIONS GIVEIV (BLDG MECH ELECT, PLMBG). CALLED BILL PIERCE AND HE IS GETTING US THE CORRECT NUMBEFiS.-dRHOAdES Comment: E-REV 22 CR1 RECEIVED. AEC SIGNED APPROVAL OF THE TEST AND BALANCE REPORT.- DRHOADES Comment: ENTERED AND SCA�NED�MAIL W IY AMOUNTS ON MBI pR�OADES/2012 FROM BILL PIERCE. Comment: The e-p lan review requ�est from Martin was forwarded to Bill Gibson for review-WCAMPBELL Comment: E-CORRECTIONS(CR1) RECEIVED AND IN LASERFICHE.-DRHOADES Comment: Response to corrections received on 9/6/12 electronically,added to Laserfiche. Includes stamped drawings for entire set. LC-ADMIN Comment: All fees except�the electrical permit fee have been waived. Email with screen shot and account number has been sent to Mike 7vlcGee,building department, David Rhoades,Judy Camp,George Ruther and Jacque Lovato.- LCAMPBELL Comment: PAYMENT MADE TO PERMIT FEES VIA DEPARTMENT TRANSFER OF FUNDS,COPY OF TRANSFER IN LASERFICHE PROJECT FOLDER.-LCAMPBELL Comment: CONTRACTOR ON SITE CONTACT IS ANDY SANDOVAL,GE JOHNSON 970-376-2523-CGODFREY Comment: Revision 1 received ON 10/19/12 a second transmittal received on 10/22/12 amending structural changes shees S1.0,S1.1 S1.2,S2.0 shown in ASI#2.Added to Laserfiche file. -LCAMP�ELL Comment: Received Revision 3 on 10/25/12 structural changes per clouded areas on sheets S1.0,S1.1 and S1.2,added to Laserfiche file.-LCAMPBELL Comment: received e submittal with revisions-REV4.Scanned to Laserfiche.-CGODFREY Comment: E-REV5 RECEIVED. ADDED DRAINS AT PUBLIC RESTROOMS.-DRHOADES Comment: Uploaded app roved Rev 4 to town,arch and contractor-MHAEBERLE Comment: E-REV6 REGEIVED (STRUCTURAL C�iANGES TO S1.0,S1.1,S1.2,S2.0 AND A5.2) IN LASERFICHE.- DRHOADES Comment: uploaded revision 5 to contracter and town-MHAEBERLE Comment: REV 6 sent to Bill G due 11/26-MHAEBERLE Comment: e submittal received.Scanned to laserfiche.-CGODFREY Comment: REV 6 corrections uploaded to town and contractor-MHAEBERLE Comment: Revision 7 uploaded to contractor and town-MHAEBERLE Comment: E-REV6 CR1 RECEIVED. STRUCTURAL CHANGES TO SHEETS S1.0,S1.1,S1.2, S2.0. REVISED ARCHITECTURAL SHEET A52. IN LASERFICHE. -MHAEBERLE Comment: uploaded Rev 6 approved plans to contractor and town-MHAEBERLE Comment: E-REV8 RECEIVED. SHOW ING PR-3 TO ADDRESS FURTHER ROUGH-INS FOR MECHANICAL, PLUMBING AND ELECTRICAL TO THE W HITE BOX SPACE AT FIRE STATION 2. -DRHOADES Comment: E-REV9 RECEIVED. SHEETS A2.1,A22,A4.1 CLARIFIED TO SHOW FIRE RATED ASSEMBLY CONDITIONS FOR THE PROJECT.-DRHOADES Comment: E REV10 received.Scanned to Laserfiche. -CGODFREY Comment: Additional information regarding ladder/stair to antenna room received and scanned to Laserfiche. Listed as 612- 0309 additional information in CF.-MHAEBERLE Comment: u�ploaded REV 9 to contractor and town-MHAEBERLE Comment: REV 8 approved awaiting payment of fees-MHAEBERLE Comment: REV11 esubmittal scanned to Laserfiche Lines 13-16 in Revisions-CGODFREY Comment: REV12 esubmittal scanned to laserfiche Line 17 in Revisions-CGODFREY Comment: REV13 esubmittal scanned to laserfiche Lines 18-21 in Revisions-CGODFREY Comment: Per Martin received correction valuations for REV8 Plumbing$14,170.16 and Electrical$16,856.56 see lines 11 and 12 in Revisions Screen-CGODFREY Comment: REV 10 uploaded to contractor and town-MHAEBERLE Comment: Rev 11 Need sealed plans-MHAEBERLE Comment: Rev 11 and 12 Need sealed plans uploaded to qet sealed plans-MHAEBERLE Comment: uploaded revision 13 to contractor and town-MHAEBERLE Comment: E-REV11 CR1 RECEIVED. STAMPED DRAWINGS TO REPLACE NON-STAMPED DRAWINGS SUBMITTED PREVIOUSLY.-DRHOADES Comment: E-REV14 RECEIVED�ASI 12)SHOWING STRUCTURAL DETAILS PER S1.2, DRYER EXHAUST ROUTING AND ELECTRICAL IN O UPbATED FOR APPLIANCES.-DRHOADES Comment: E-REV15 RECEIVED. ELECTRICAL REVISIONS.-DRHOADES Comment: E-REV12 CR1 RECEIVED. STAMPED MEP PAGES TO REPLACE UNSTAMPED PAGES PREVIOUSLY SUBMITTED.-DRHOADES Comment: E-REV16 RECEIVED SHOW ING THE ALTERNATING STEP STAIR THAT GOES UP THE TOW ER.- DRHOADES Comment: uploaded Rev 11 to town and contractor shared file-MHAEBERLE Comment: E-REV17 RECEIVED AND IN LASERFICHE. ASI 13 SHOW ING LIGHTING REVISIONS.-DRHOADES Comment: Rev 12 approved& uploaded to theTown and contractor-MHAEBERLE Comment: Rev 15 uploaded and approved-MHAEBERLE REPT131 Run Id: 14685