Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutDRB120458 PLANS2
1
3 4
5
321
C
B
A
This document [and all of the information it
contains] constitutes original Venture
Architecture work. It may not be used or
reproduced in any way without the expressly
written authorization of Venture Architecture.
1206
06.13.12Release DATE:
Release NAME:
Project Number:
CD'S
A1.01
D
5
321 5
C
B
A
D
4
4
RE
M
O
D
E
L
A
N
D
A
D
D
I
T
I
O
N
53
5
E
a
s
t
M
e
x
i
c
o
A
v
e
n
u
e
D
e
n
v
e
r
,
C
o
l
o
r
a
d
o
8
0
2
1
0
30
3
.
7
2
2
.
9
9
8
8
[
p
h
o
n
e
]
3
0
3
.
7
2
2
.
9
9
8
9
[
f
a
x
]
ww
w
.
v
e
n
t
u
r
e
a
r
c
h
i
t
e
c
t
u
r
e
.
c
o
m
WO
L
F
F
R
E
S
I
D
E
N
C
E
27
2
4
B
A
L
D
M
O
U
N
T
A
I
N
R
O
A
D
VA
I
L
,
C
O
L
O
R
A
D
O
8
1
6
5
7
MAIN LEVEL FRAMING
PLAN
V
E
N
T
U
R
E
A
R
C
H
I
T
E
C
T
U
R
E
S
m
a
r
t
D
e
s
i
g
n
.
S
u
c
c
e
s
s
f
u
l
V
e
n
t
u
r
e
.
12
0
6
.
0
1
C
A
-
2
.
p
l
n
06.01.12
04.26.12 PLAN REVIEW
REVISIONS
08.01.12 DRB CHANGES 08.06.12 LIGHTING
08.22.12 REVISIONS
PLAN
NORTH
P
N
D104A
M
D000
D0
0
0
K
D103A
D0
0
0
A
D100BD100A
D1
0
3
B
D101B
G
D107A
D108A
D1
0
1
A
D1
0
6
A
A4
A7.00
B4
A7.00
6"
13
'
-
9
"
31/
2
"
14
'
-
6
1/
2
"
31/
2
"
6"31/2"
31/2"10'-6"51/2"23'-1"6"
6"
23
'
-
0
"
22
'
-
4
"
6"
1/
2
"
15
'
-
8
"
6'
-
0
"
51/
2
"
13
'
-
3
1/
2
"
9'
-
0
1/
2
"
6"
13'-8"9'-0"2'-0"9'-0"1'-111/2"
35'-71/2"
2'-01/2"31/2"
8'-111/2"8'-111/2"9'-1"20'-61/2"
47'-61/2"
5'-11/2"10'-81/2"4'-81/2"
B5
A5.01
D4
A5.01
DN
UP
DN
DN
ADDITIONEXISTING
TYPTYP
TYP
TYP
SEE DOOR
ELEVATIONS (A8.01)
FOR SAFTY GLAZING
REQUIREMENTS
KITCHEN
105
ROOM
DINING
104
LIVING ROOM
103
MUD ROOM
101
GARAGE
100
POWDER
106
STAIRS
102
LAUNDRY
107
PANTRY
108
D5
A6.02
D5
A6.00
D5
A6.00
D4
A6.02
CE
A
13
4
1
51/2"6'-6"31/2"8'-7"31/2"7'-5"6"
5'-21/4"
51/
2
"
5'
-
7
"
31/
2
"
16
'
-
5
1/
2
"
6"
D5
A6.01
D5
A6.01
D2
A6.02
D4
A5.00
B5
A5.00
CONTRACTN.I.C
#
1
2
3
4
FRAMING PLAN KEYED NOTES
LEGEND
EXISTING WALL TO REMAIN
EXISTING WALL TO BE REMOVED
EXISTING DOOR TO REMAIN
EXISTING DOOR TO BE REMOVED
D###
NEW DOOR
EXISTING DOOR TO BE REMOVED
NEW WALL
DD-##RE: DOOR SCHEDULE OF RE-USE LOCATION.
RE: DOOR SCHEDULE.
RE: WALL TAG AND WALL SCHEDULE.
WOOD COLUMN. RE: STRUCTURAL
STEEL BEAM. RE: STRUCTURAL
STEEL COLUM. RE: STRUCTURAL
WOOD POST. RE: STRUCTURAL
SCALE: 1/4" = 1'-0"D4 MAIN LEVEL FRAMING PLAN
TRUE
NORTH
08.01.1208.01.12
33
2
1
3 4
5
321
C
B
A
This document [and all of the information it
contains] constitutes original Venture
Architecture work. It may not be used or
reproduced in any way without the expressly
written authorization of Venture Architecture.
1206
06.13.12Release DATE:
Release NAME:
Project Number:
CD'S
A1.02
D
5
321 5
C
B
A
D
4
4
RE
M
O
D
E
L
A
N
D
A
D
D
I
T
I
O
N
53
5
E
a
s
t
M
e
x
i
c
o
A
v
e
n
u
e
D
e
n
v
e
r
,
C
o
l
o
r
a
d
o
8
0
2
1
0
30
3
.
7
2
2
.
9
9
8
8
[
p
h
o
n
e
]
3
0
3
.
7
2
2
.
9
9
8
9
[
f
a
x
]
ww
w
.
v
e
n
t
u
r
e
a
r
c
h
i
t
e
c
t
u
r
e
.
c
o
m
WO
L
F
F
R
E
S
I
D
E
N
C
E
27
2
4
B
A
L
D
M
O
U
N
T
A
I
N
R
O
A
D
VA
I
L
,
C
O
L
O
R
A
D
O
8
1
6
5
7
UPPER LEVEL FRAMING
PLAN
V
E
N
T
U
R
E
A
R
C
H
I
T
E
C
T
U
R
E
S
m
a
r
t
D
e
s
i
g
n
.
S
u
c
c
e
s
s
f
u
l
V
e
n
t
u
r
e
.
12
0
6
.
0
1
C
A
-
2
.
p
l
n
06.01.12
04.26.12 PLAN REVIEW
REVISIONS
08.01.12 DRB CHANGES 08.06.12 LIGHTING
08.22.12 REVISIONS
PLAN
NORTH
P
N
M
F
L
D203D
D2
0
1
C
D
D2
0
3
A
D2
0
3
B
D2
0
2
A
D203C
D202C
D202B
D201DD201AD201B
F
F
A4
A7.00
B4
A7.00
C5
A4.00
B5
A5.01
D4
A5.01
5'
-
6
1/
2
"
31/
2
"
3'
-
1
0
1/
2
"
31/
2
"
3'
-
9
"
31/
2
"
10
'
-
7
1/
2
"
6"
5'
-
3
1/
2
"
31/
2
"
3'
-
7
"
51/
2
"
5'
-
0
"
31/
2
"
3'
-
1
"
2'
-
1
1
"
31/
2
"
10
'
-
8
1/
2
"
6"
8'-111/2"8'-111/2"9'-1"20'-61/2"
4'-7"15'-111/2"
7'
-
8
"
17
'
-
6
1/
2
"
51/
2
"
25
'
-
2
1/
2
"
2'-8"
51/
2
"
61/
2
"
47'-61/2"
31/
2
"
10
'
-
0
7/
8
"
31/
2
"
2'-91/2"
3'-0"
DN
ADDITIONEXISTING
OPEN TO
BELOW
TYPTYP
TYP
TYP
BEDROOM 3
MASTER
203
BEDROOM 1
MASTER
201
BEDROOM 2
MASTER
202
MECH
204STAIRS
200
B
D5
A6.02
D5
A6.00
D5
A6.00
D4
A6.02
D5
A6.01
D5
A6.01
D2
A6.02
D4
A5.00
B5
A5.00
13
4
1
31/2"19'-5"31/2"8'-11"6"
111/2"31/2"5'-1"31/2"12'-3"31/2"3'-11"31/2"9'-2"31/2"7'-5"31/2"6'-1"6"
5'-0"51/2"3'-6"51/2"31/2"
31/2"10'-6"51/2"9'-3"51/2"13'-41/2"6"
CONTRACTN.I.C
#
1
2
3
4
FRAMING PLAN KEYED NOTES
LEGEND
EXISTING WALL TO REMAIN
EXISTING WALL TO BE REMOVED
EXISTING DOOR TO REMAIN
EXISTING DOOR TO BE REMOVED
D###
NEW DOOR
EXISTING DOOR TO BE REMOVED
NEW WALL
DD-##RE: DOOR SCHEDULE OF RE-USE LOCATION.
RE: DOOR SCHEDULE.
RE: WALL TAG AND WALL SCHEDULE.
WOOD COLUMN. RE: STRUCTURAL
STEEL BEAM. RE: STRUCTURAL
STEEL COLUM. RE: STRUCTURAL
WOOD POST. RE: STRUCTURAL
SCALE: 1/4" = 1'-0"D4 UPPER LEVEL FRAMING PLAN
TRUE
NORTH
08.01.12
3
2
1
3 4
5
321
C
B
A
This document [and all of the information it
contains] constitutes original Venture
Architecture work. It may not be used or
reproduced in any way without the expressly
written authorization of Venture Architecture.
1206
06.13.12Release DATE:
Release NAME:
Project Number:
CD'S
A1.03
D
5
321 5
C
B
A
D
4
4
RE
M
O
D
E
L
A
N
D
A
D
D
I
T
I
O
N
53
5
E
a
s
t
M
e
x
i
c
o
A
v
e
n
u
e
D
e
n
v
e
r
,
C
o
l
o
r
a
d
o
8
0
2
1
0
30
3
.
7
2
2
.
9
9
8
8
[
p
h
o
n
e
]
3
0
3
.
7
2
2
.
9
9
8
9
[
f
a
x
]
ww
w
.
v
e
n
t
u
r
e
a
r
c
h
i
t
e
c
t
u
r
e
.
c
o
m
WO
L
F
F
R
E
S
I
D
E
N
C
E
27
2
4
B
A
L
D
M
O
U
N
T
A
I
N
R
O
A
D
VA
I
L
,
C
O
L
O
R
A
D
O
8
1
6
5
7
ROOF LEVEL PLAN
V
E
N
T
U
R
E
A
R
C
H
I
T
E
C
T
U
R
E
S
m
a
r
t
D
e
s
i
g
n
.
S
u
c
c
e
s
s
f
u
l
V
e
n
t
u
r
e
.
12
0
6
.
0
1
C
A
-
2
.
p
l
n
06.01.12
04.26.12 PLAN REVIEW
REVISIONS
08.01.12 DRB CHANGES 08.06.12 LIGHTING
08.22.12 REVISIONS
PLAN
NORTH
PLAN
NORTH
#
1
2
3
4
5
6
7
8
9
LEGEND
ROOF PLAN KEYED NOTES
SLOPE OF STRUCTURE
(AS INDICATED)
EXISTING: WOOD SHAKES
NEW ASPHALT SHINGLES (CLASS A, MIN. 300 LBS PER SQUARE) OVER EXISTING STRUCTURE.
NEW ASPHALT SHINGLES (CLASS A, MIN. 300 LBS PER SQUARE) OVER NEW STRUCTURE.
OPEN TO PORCH BELOW.
EXISTING METAL GUTTERS AND DOWNSPOUTS, PAINT.
NEW METAL GUTTERS AND DOWNSPOUTS MATCH EXISTING, PAINT.
NEW: ASPHALT SHINGLES
(CLASS A, MIN. 300 LBS PER SQUARE)
BOILER FLUE
PLUMBING VENT
EXHAUST VENT
SOLAR ELECTRIC SYSTEM (28 PANEL SYSTEM)
SLOPE DN
7:12
B5
A5.01
D4
A5.01
ADDITIONEXISTING
ADDITIONEXISTING
RIDGE
SLOPE CHANGE
RIDGE
D5
A6.02
D5
A6.00
D5
A6.00
D4
A6.02
D5
A6.01
D5
A6.01
D2
A6.02
D4
A5.00
B5
A5.00
1
1
1
2
2
1
1
1
3
4 5
5
5
5
8
7
8
8
7
6
8
1
9
9
9
9
3'-6"16'-10"11'-2"11'-2"8'-41/2"
1'-0"1'-0"
1'
-
0
"
34
'
-
9
1/
4
"
13
'
-
7
3/
4
"
1'
-
0
"
13
'
-
0
7/
8
"
1'
-
0
"
A5
A6.00
A5
A6.00
A5
A6.00
A4
A6.00
A3
A7.00
A3
A7.00
A3
A7.00
S
L
O
P
E
D
N
7:
1
2
S
L
O
P
E
D
N
7:
1
2
S
L
O
P
E
D
N
7:
1
2
S
L
O
P
E
D
N
7:
1
2
S
L
O
P
E
D
N
7:
1
2
S
L
O
P
E
D
N
7:
1
2
S
L
O
P
E
D
N
7:
1
2
S
L
O
P
E
D
N
4:
1
2
CONTRACTN.I.C
SCALE: 1/4" = 1'-0"D4 ROOF LEVEL PLAN
TRUE
NORTH
TRUE
NORTH
08.01.12
08.01.12
3
3
2
1
3 4
5
321
C
B
A
This document [and all of the information it
contains] constitutes original Venture
Architecture work. It may not be used or
reproduced in any way without the expressly
written authorization of Venture Architecture.
1206
06.13.12Release DATE:
Release NAME:
Project Number:
CD'S
A5.00
D
5
321 5
C
B
A
D
4
4
RE
M
O
D
E
L
A
N
D
A
D
D
I
T
I
O
N
53
5
E
a
s
t
M
e
x
i
c
o
A
v
e
n
u
e
D
e
n
v
e
r
,
C
o
l
o
r
a
d
o
8
0
2
1
0
30
3
.
7
2
2
.
9
9
8
8
[
p
h
o
n
e
]
3
0
3
.
7
2
2
.
9
9
8
9
[
f
a
x
]
ww
w
.
v
e
n
t
u
r
e
a
r
c
h
i
t
e
c
t
u
r
e
.
c
o
m
WO
L
F
F
R
E
S
I
D
E
N
C
E
27
2
4
B
A
L
D
M
O
U
N
T
A
I
N
R
O
A
D
VA
I
L
,
C
O
L
O
R
A
D
O
8
1
6
5
7
EXTERIOR ELEVATIONS
V
E
N
T
U
R
E
A
R
C
H
I
T
E
C
T
U
R
E
S
m
a
r
t
D
e
s
i
g
n
.
S
u
c
c
e
s
s
f
u
l
V
e
n
t
u
r
e
.
12
0
6
.
0
1
C
A
-
2
.
p
l
n
06.01.12
04.26.12 PLAN REVIEW
REVISIONS
08.01.12 DRB CHANGES 08.06.12 LIGHTING
08.22.12 REVISIONS
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
ELEVATION KEYED NOTES
NEW DOOR @ EXISTING OPENING. RE: DOOR SCHED. FEILD VERIFY ALL DIMS AND CONDITIONS.
NEW WINDOW @ EXISTING OPENING. RE: DOOR SCHED. FEILD VERIFY ALL DIMS AND CONDITIONS.
NEW WOOD SIDING TO MATCH EXISTING. NEW & EXISTING SIDING TO BE PAINTED, ON BOTH
UNITS.
EXISTING WOOD SIDING TO REMAIN, PAINT.
NEW STUCCO FINISH TO MATCH TEXTURE AND COLOR @ ADJACENT UNIT.
NEW ASPHALT SHINGLES
NOT USED
NEW MAIN LEVEL DECK, MATCH EXISTING LOWER LEVEL DECK.
NEW MAIN LEVEL GUARDRAIL, MATCH LOWER LEVEL GUARDRAIL.
EXISTING GARAGE DOORS, REINSTALL.
EXISTING METAL GUTTERS AND DOWNSPOUTS, PAINT.
NEW METAL GUTTERS AND DOWNSPOUTS, MATCH EXISTING, PAINT.
WOOD FACISA BOARD, MATCH EXISTING. ALL FACISA TO BE PAINTED ON BOTH UNITS.
NEW WINDOW, RE: WINDOW SCHEDULE.
NEW STOREFRONT WINDOWS, RE: WINDOW SCHEDULE.
NEW EXTERIOR LIGHT FIXTURE
SIDE WALL EXHAUST VENT
NEW ELECTRICAL SERVICE LOCATION.
SOLAR ELECTRIC SYSTEM (28 PANEL SYSTEM)
T.O. MAIN LEVEL
EL. 100'-0"
T.O. UPPER LEVEL
EL. 108'-11"
ADDITIONEXISTINGCONTRACTN.I.C
TYP
T.O. LOWER LEVEL
EL. 91'-1"
T.O. ROOF
EL. 123'-9 1/4"
66
2
1233
10
21
10
16
12
13
T.O. MAIN LEVEL
EL. 100'-0"
T.O. UPPER LEVEL
EL. 108'-11"
T.O. LOWER LEVEL
EL. 91'-1"
T.O. ROOF
EL. 123'-9 1/4"
14
15
12
13
3
5
15
14
14
3
3
5
5
13
8
9
12
14
18
19
SCALE: 1/4" = 1'-0"B5 NORTH ELEVATION
SCALE: 1/4" = 1'-0"D4 WEST ELEVATION
08.01.12
08.01.12
3
3
2
1
3 4
5
321
C
B
A
This document [and all of the information it
contains] constitutes original Venture
Architecture work. It may not be used or
reproduced in any way without the expressly
written authorization of Venture Architecture.
1206
06.13.12Release DATE:
Release NAME:
Project Number:
CD'S
A5.01
D
5
321 5
C
B
A
D
4
4
RE
M
O
D
E
L
A
N
D
A
D
D
I
T
I
O
N
53
5
E
a
s
t
M
e
x
i
c
o
A
v
e
n
u
e
D
e
n
v
e
r
,
C
o
l
o
r
a
d
o
8
0
2
1
0
30
3
.
7
2
2
.
9
9
8
8
[
p
h
o
n
e
]
3
0
3
.
7
2
2
.
9
9
8
9
[
f
a
x
]
ww
w
.
v
e
n
t
u
r
e
a
r
c
h
i
t
e
c
t
u
r
e
.
c
o
m
WO
L
F
F
R
E
S
I
D
E
N
C
E
27
2
4
B
A
L
D
M
O
U
N
T
A
I
N
R
O
A
D
VA
I
L
,
C
O
L
O
R
A
D
O
8
1
6
5
7
EXTERIOR ELEVATIONS
V
E
N
T
U
R
E
A
R
C
H
I
T
E
C
T
U
R
E
S
m
a
r
t
D
e
s
i
g
n
.
S
u
c
c
e
s
s
f
u
l
V
e
n
t
u
r
e
.
12
0
6
.
0
1
C
A
-
2
.
p
l
n
06.01.12
04.26.12 PLAN REVIEW
REVISIONS
08.01.12 DRB CHANGES 08.06.12 LIGHTING
08.22.12 REVISIONS
#
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
ELEVATION KEYED NOTES
NEW DOOR @ EXISTING OPENING. RE: DOOR SCHED. FEILD VERIFY ALL DIMS AND CONDITIONS.
NEW WINDOW @ EXISTING OPENING. RE: DOOR SCHED. FEILD VERIFY ALL DIMS AND CONDITIONS.
NEW WOOD SIDING TO MATCH EXISTING. NEW & EXISTING SIDING TO BE PAINTED, ON BOTH
UNITS.
EXISTING WOOD SIDING TO REMAIN, PAINT.
NEW STUCCO FINISH TO MATCH TEXTURE AND COLOR @ ADJACENT UNIT.
NEW ASPHALT SHINGLES
NOT USED
NEW MAIN LEVEL DECK, MATCH EXISTING LOWER LEVEL DECK.
NEW MAIN LEVEL GUARDRAIL, MATCH LOWER LEVEL GUARDRAIL.
EXISTING GARAGE DOORS, REINSTALL.
EXISTING METAL GUTTERS AND DOWNSPOUTS, PAINT.
NEW METAL GUTTERS AND DOWNSPOUTS, MATCH EXISTING, PAINT.
WOOD FACISA BOARD, MATCH EXISTING. ALL FACISA TO BE PAINTED ON BOTH UNITS.
NEW WINDOW, RE: WINDOW SCHEDULE.
NEW STOREFRONT WINDOWS, RE: WINDOW SCHEDULE.
NEW EXTERIOR LIGHT FIXTURE
SIDE WALL EXHAUST VENT
NEW ELECTRICAL SERVICE LOCATION.
SOLAR ELECTRIC SYSTEM (28 PANEL SYSTEM)
ADDITION EXISTING CONTRACT N.I.C
TYP
T.O. MAIN LEVEL
EL. 100'-0"
T.O. UPPER LEVEL
EL. 108'-11"
T.O. LOWER LEVEL
EL. 91'-1"
T.O. ROOF
EL. 123'-9 1/4"
14
6
1414
14
14
15
15
14 121
12
12
12
19
12
12
3
4
3 4
5
5
4
4
8
9
13
13
13
13
16
17
19
6 66
T.O. MAIN LEVEL
EL. 100'-0"
T.O. UPPER LEVEL
EL. 108'-11"
T.O. LOWER LEVEL
EL. 91'-1"
12
4
8
9
13
5
4
4
4
4
19
SCALE: 1/4" = 1'-0"B5 SOUTH ELEVATION
SCALE: 1/4" = 1'-0"D4 EAST ELEVATION
08.01.12
08.01.12
08.01.12
08.01.12
3
3
3
3