HomeMy WebLinkAboutVAIL POTATO PATCH BLOCK 1 LOT 10 PART 2 LEGALo DE'ARTMENT.FC.MMUNT #'#r',!#'!a /oa'r'-
NOTE: THIS PERMIT MUST BE POSTED ON IOBSITE AT ALL TIMES
ADD/ALT SFR BUILD PERMIT
]ob Address: 794 POTATO PATCH DR VAIL
Location.....: LIMT A
ParcelNo...: 2101M307047
Project No :
APPIJICANT DYNAMIC FINTSHES
P.O. BOX 3655
VAIIT, CO
81658
L,i.cense: 461-8 AIso is COIiITRACTOR
owNER cocswgr-,L iIoHN & pATRrcE o7/2s/L99s phone:
794 POTATO PATCH DR
VAIL CO
8 r.557
Licenge:
coMrRAeToR DYNAT{IC FINTSTTBS O7/25/a995
P.O. BOX 366s
VAIIJ, CO
81658
I-,icense: 461--8 Also i.s Applicant
Description:
ADDITION OF BIIRY AND BEDROOM
Occupancy: R3 Single Family Residence
Type Construction:V N Type V Non-Rated
Valuation: $50,000.00 Add Sq Fe 489
rowNorvalr
75 S. FRONTAGEROAD
VAIL, CO 81657
970479-2738
Building->
Plan Check->
Investigation->
will calt->
$490. oo Restuarant Plan Review->
S318 . s0 DRB Fee->
$o . oo Recreadon Fee->
$3.00 Clean-uPDePaait->
TOTAL FEEg-->
So . oo Total Calculated Fees->
sso. oo Additional Fees >
S?3.35 Total Pernrit lee->
$250. 00 Payments->
sl, 184 . 85 BALANCE DUE->
Permit #:895-0224
o7 /25/t995 Phone z 3O347l.O747
Phonel' 3O347LO74?
FINAL
07/25/1995
08/77/7995
02/73/7ee6
TOV/Comm. Dev.
Cfean-up Deposit Refund
approved
amount
date
# ofGaslngs: 0 #ofFireplace Infornation: Restricted:# of Gas Appliances: 0
Wood Pellet
sl, 184 . S5
s0.00
$1, 184 . 8s
$1, 1S4 . 85
Approvals:IEdm: 05100 BUILDING DEPARTMBMI
08109/1995 DAII Action:
Item: 05400 PLAIINING DEPARTMEMI
08/Ls/L995 cEoRGE Acrion:
Item: 05600 FIRE DEPARTMEIiII
07/22/1996 D?N Action:
ftem: 05500 PIIBL,IC T|ORKS
APPR
APPR N/A
07/22/L996 DA\t Action: APPR N/A
See page 2 of this Documentfor any conditions that may apply to this permit.
DECLARATIONS
I hereby acknowledge that I have read this applicatiorl filled out in full the inlormation required, completed an
accurate plot plar; and state that all the inforuration as required is correct I agree to comply with the information and
plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoninp
and subdivision codes, design review approved, Unilorm Building Code and other ordinances of the Town applicable
thereto.
REQLJESIS FOR INSPECflON SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-449 OR AT OUR OFFICE FROM 8:(n AM - 4
PN{.
SIGNAruRE OF OWNER OR CONTRACTOR FOR HIMSELF AND OWNEF
PAGE 2
CONDITIONSOF APPROVAL
Perrrit #: B954224 as of 0618-2003 Status: FINAL
*!#***ffi ffi ******#*****#*****t******ril********r*rit***H*ffi ,i*#r
PeruritType: ADD/ALT SFR BUILD PERMIT Applied: 07/25/7995
Applicant DYNAMIC FINISHES Issued: 08/17/1995
30U710747 To Expire: 02/73/1996
]ob Address: 794POTATO PATCH DR VAIL
Location: LINTT A
ParcelNo: 210106301047
Description:
ADDITION OF ENTRY AND BEDROOM
COnditiOnS *|Hr*******i***#r*i#ritrri**#'*rsr* l.,.rH t*
Cond: CON0000510
SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOIvG AS PER SEC.
1210 0F THE 1991 UBC.
Cond: CON0000511
HANDRAITS AND GUARDRAILSARE REQUTREDTOMEET SEC.3305 &
1712OF THE 1991 UBC.
Cond: CON0000612
ASTRUCTUAL ENGINEERMAYBE REQUIRED TO APPROVE ANY
STRUCTUALCHANGES BEFORE TOV WILL OKAY FRAMING INSPECTION.
Cond: CON0000613
FIELD INSPECTIONS ARE RQUIRED TO CHECKFORCODE COMPLIANCE.
*f+**********.lt+*****{'*********'1"}*********r+*+**+t**'}t+:t{r+tt*** ** ***********++******++*+*+***
TOWN OF VAIL, COLORADOCopy Rcprlntcd or 0G1&2lXl3 rtl1ztlzl2 0611812003
Statement
+ * * * * * *** + * +
'a
* * * * *** + t * {.* +* * + * * * * * * * t t + f + t*'l *t * * 't i * ** * rl
't * * + 'i * * * * * * * * * * * * * * * * * * * I 'i + * +** + * * + * *
Statenent Nunber:REC-0056 rnount: $1,184.85 0g/L7/]-99512:58 PM
Pa:ment.Method: cK1068 Init: 'JR Notatsion:
Permit No:
Parce1 No:
Site Addrees:
IJocation:
This PaymenE:
895-0224
2101053 01047
794 POTATO PATCH
T'NIT A
$1, 184 .85
r}PE: ADD/AI,T SFR BUII,D PER}IIT
DR VAII,
Total Feea 3
Total AL,L Pmts :
Balance:
Current Pmts
$1, 184 . 8s
$1, 184 . 85
$o. oo
* + + *+*{t** * * * r* ***+t + + t'} *l'f ** * * t f* * ***lt t + | ***'t+ +*lt + | +*+ * ***a****t*rt* f *t * * ***** * l***t'+++++**
ACCOI,JNT ITEM LIST:
Account Code Descni pti on
AD
BP
DR
PF
RF
WC
D2 - DEPOS
00100003111100
00100003112200
00100003112300
11100003112700
00100003112800
CLEANUP DEPOSITS
BUILDING PERMIT FEES
DESIGN REVIEhJ FEES
PLAN CHECK FEES
RECREATION FEES
I,JILL CALL INSPECTION FEE
250 .00
490 .00
50 .00
318.50
73.35
3.00
o
9
'1.ozOD.oo-
tl
;
hozoo.ooo
oj
Tt
A4
o
o
I
6
F
T
H&!ao
Fa)
N
N
6I.
6
GiTFaF
6
63.
e
|l
t,
F
Rn2rftrd88*HaslZRcqoa
ooEa
q
lt|t arCAur!
EA.(Jdr E*a qoo tAI{
aro|al 6 l!oo tr;a Ioto aDoB
F!lroO
rt
6I
AFzz
EBETE6
EE
EE
F. FIazE!'
E9l0a
aa
!Et{a6
Eo
iE
Es
I
FI
e
he
EHa
N
T.A}|
FI
2o
EHr!l-(,
EI oEE.I EX
E t8
aHiro
B
EL
HD
i)I
E
A
EEt
:.Hq|I
E
F
|a
C'
iF
caaI>
Elr}|cao4Uoio c
HEBAAI.
lltr'4-tur,roL,(,tAo
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL
PROJECT TTTLE! COGSWELL ADDITION
ADD/ALT SFR BUILD PERMIT Permit
TIMES
895-0224
75 South Frontage Road
Vail, Colorado 81657
970-479-213V479-2139
FAX 970-479-2452
Item:05100
08 /oe /tee5Item:05400
08 /Ls/reesItem:05600
Item: 05500
794 POTATO PATCH
UNIT A
2101-063-01-047
PRJ9 5-013 9
.00
50.00
73.35
250.00
1 ,184.85
Department of Community Development
Phonez 30347L0747
Phone : 30347 L07 47
TotaI Catcutated tees--->'l .184.85
Additional, Fees---------> .0O
TotaI PerDit Fee------->1 ,1E/..85
1 ,1E4. E5
.00
Dept: BUILDING Divisj.on:
Dept: PLANNING Division:
Dept: FIRE Division:
Dept: PUB WORK Division:
DR Status...: ISSUEDApplied..: 07/2s/L99sIssued...: 0e/77/t99s
Expires. . : 02/L3/t996
Job Address
Location. . .
Parce] No..Project No.
APPLICANT DYNA},IIC FINISHES
, vArt, co 81658
CONTRACTOR DYNAMIC FINISHES
, vArL, co 81658OWNER COGSWELL JOHN & PATRICE
794 POTATO PATCH DR, VAIL CO 81657
DescTiption:ADDITION OF ENTRY AND BEDROOM Nurnber of Dwellinq Units: 000
50, 000Town of Vail Adjusted Valuation:
Fireptace Inforration: Restricted:#0f Gas App [i ances:#of 6as Logs:fof tlood/Pa l, Let:
ffiffiffffi*#rhffiH**ffi#*,rff**ffiFEEsul'l',|ARY*'r'Hrrt*#r'ffir**,r#lffiuHJr'ffirJr*ffir*ffi***ffi#
8ui tdi n9----). 490.@ Restuarant Ptan Review-->
Ptan check---> 518.50 DRB
Investigation>
tli tt caIt---->
.00 Recreation Fee------->
3.00 C tean-Up Deposi t-------->
TOTAL FEES-----
BUILDING DEPARTMENT
DAN Action: APPR
PLANNING DEPARTMENT
GEORGE Action: APPR
FIRE DEPARTMENT
PUBLIC WORKS
BALANCE DUE-_-
ffi*ffiffi*ffiffi*ffi*Hffiffi##r*t*fiffiffiffi#******#***Jr*lr|tffi*ffi*H#**lil
See Page 2 of this Document for any conditions that nay apply to this permit,
DECLARATIONS
I hereby ackno\ttedgr that I have read this apptication, fitted out in ful,t the information required, compteted an accurate ptot
ptan, and state that all the information provided as required is correct. I agree to conpl,y with the information and pl.ot pl.an,
to comply lrith al,t Tovn ordinances and state [aws, and to buitd this structurc according to the Toun's zoning and subdivision
codes, design reviev approved, Unifor[ Buitding code and other ordinances of the Tolrn appLicabLe thereto.
REOUESTS FOR TNSPECTIONS SHALL BE }IADE T}'ENTY-TOUR HOURS IN ADVAI{CE BY
Send C lesn-Up Deposit To: DYNA}IIC FINISHES
{pr**uo
********PAGE 2**************************************************************
CONDITIONS OF APPROVALTOOFVAIL
E-Frrrr e 7r - Lt r -, v .. ..'ttt'75btthfT,ftigdRdi#*****************************tttStvpdftkUf6Cblr,fltitt,Dt*bpt*tW**
Vail. Colorado 81657geryr*wwrypz2H,D/ALT SFR BUILD PERMIT Applied: o7/25/L995paffip)jffi$2 DYNAMIC FINISHES Issued: o8/17/L99s-J-ob Addressl 794 PorATo PATCH DR
Location: UNIT A
Parcel No: 2101-063-01-047
********************************************************************************
CONDITIONS********************************************************************************.
1. SMOKE DETECTORS ARE REQUIRED ]N ALL BEDROOMS AS PER SEC.
1210 0F THE 1991 UBC.
2. HANDRAILS AND GUARDRAILS ARE REQUIRED TO MEET SEC.33O6 &
1712 0F THE 1991 UBC.
3; A STRUCTUAL ENGINEER MAYBE REOUIRED TO APPROVE ANY STRUCTUAL
CHANGES BEFORE TOV WILL OKAY FRAMING INSPECTION.
4. FIELD INSPECTIONS ARE RQUIRED TO CHECK FOR CODE COMPLIANCE.
{grnnuoruo
****************************************************************
TO9IN OF VAIIJ, COLORADO Statemnt****************************************************************
Statemnt Number: REC-0056 Amount:
Payment Method: CK1068 Notation:1,184.85 O8/t7/95 12:58Init: JR
**********************************************************!******
Perrnit No:
Parcel No:Site Address:
Location:
This Payment
Account. Code
01 0000 41310
01 0000 41331
01 0000 4t332
01 0000 22002
30 0000 4so32
01 0000 4L336
895-0224 Tltpe 3
2101-063-01-047
794 POTATO PATCH
UNIT A
A-BUTLD ADD/ALT
DR
Total Fees:
SFR BUILD PE
1, 184. 85
1, 184 . 85
.00
1,184.85 Total ALL Pmts:
Balance:
Description
BUILDING PERMIT FEES
DESIGN REVIE}I FEES
PIJAN CHECK FEES
CLEANUP DEPOSITS
RECREATION FEESWILI CALL INSPECTION FEE
Anount
490. 00
50.00
318.50
250.00
73.35
3.00
a' 2 zrr
F<l -Plurnbing-BuiIding
Job Nane:
[l{:Electrical [ ]-1.!echanibal [ ]-other
Job Address:
FiIing
19? 4Pa1-+o P+rczlr,u(Ph.
Legal Description: l,ot]fulr tI
Owners Name:
Architect- \.1
General Description:
work crass: [ ]-New [0Q-Arteration t ]-Additional [ ]-Repair [ ]-other
Number of Dwelling Units:Number of Accomnodation Units: 4-
Address:
Address:Pt..53.t -q't)
',,/lL 'l tUIT Gas l_ogs tu/4 l{oodlpellet_rt'/4
actors
ELEcTRIcAt : | &.Ooo.oo OTHER: I
TOTAL: | 6O,ooo.oo
******** * * * **** ************
To!'m of vail Req. NO.4A l-B
Phone Number: qqq-ffi
rown of vail Res. Nof,3? E
1$frlrone Number: 47 6 -^qtT
l3Lt-P
EIectrical,,Co
Address: 4qC
Address:
DRB FEE:
Plunbing Contractor:
Address:s
Mechanical Contractor:
Address:
PLUT.IBING PERUTT FEE:
MEC}TANICAIJ PER}TIT FEE:
ELECTRICAL FEE:
OTHER TYPE OF FEE:
Reg. NO.
oFFrcE usE *******************************
BUTLDING PI,AN CHECK FEE:
PLI'I'TBING PI,AN CHECK FEE 3
MECITANTCAL PI.AN CHECK FEE:
RECREATION FEE:
CI.,EAN-UP DEPOSTT:
TOTAL PERI.TIT
Town of Vail
Phone Nurnber:
Town of Vail
Phone Number:
FOR
ovr€5!b.*W
Rqg. No.
CI.EAII I'P DEPOSIT BENIilD }r\,/lIDYnt'u4t o*t nt6;/aS
NOTE! THIS PERMIT MUST BE POSTED ON
ELECTRICAL PERMIT
JOBSITE AT ALL TIMES
Permit #: 895-0152
75 South Frontage Road
Vail, Colorado 81657
970-479 -2 1 3 8/479-2 I 3 9
FAX 970-479-2452
E Iectri ca l-->
DRB Flc
Invest'i gation>
0i lL cat t---->
TOTAL FEES--->
Department of Community Deve lopment
APPLICANT DYNAMIC FINISHES
, VAIL, CO 81658
CONTRACTOR DYNAMIC FINISHES
, VAIL, CO 81659OWNER COGSWELL JOHN & PATRICE
794 POTATO PATCH DR, VAIL CO 81657
CONTR.ACTOR WIRE NUT ELECTRIC
PO BOX 1112, AVON CO 81620
Description: ADDITION OF ENTRY AND BEDROOM
Job Address
Location...
Parcel No..Project No.
50.00
.00
.00
3.00
55.00
794 POTATO PATCH
UNIT A
2101-063-01-047
PRJ9 5 -013 9
DR Status. . .
AppJ.ied..
Issued. . .
Expires. .
ISSUED
07 /25/7ee5LO/3L/tee5
04 /28 /ree6
Phone : 3Q347 L07 4'l
Phone z 30347L0747
Phone : 3O34'l 64236
Valuation:2, 000 . 00
ffiffiffiffiffi FEE SUtlllARy rt***tt*t/.tfr*r
Totat Catcutated Fees-->
Additionai Fecs-------->
Tota[ Perrit Fe.------->
Payncnts-------
EALANCE oUE---
53.00
.00
53.00
53 .00
.m
Itt*f***tttffi*fi*ffiffi
!tqm: .06000 ELECTRICAL DEPARTMENT07/25/1995 Dp.}t Acrion: AppR Dept: BUILDING Division:
CONDITION OF APPROVAL
'*ffffi *,Hr*tr*tffi*iffiffiffiffi
DECLARATIONS
I.hcrcby _acknostedge that I havc rlad this apptication, fitted out in fuL! thc infornation requi r.d, conptetad an accurate ptot
Ptan, and strte that att thc intornation providcd as rcquired is corrcct. I agrcc to conply vith the iniorrnation and ptot pl,an,to conP I'y uith atL ToHn ordinanccs -and st.tc taHs, and to buitd this structure according io-the Tovn's zoning and subdivisii:ncodcs/ design reviev approvcd, Unifofn Buitding Code and other ordinances of thc Town appl,icabte thcrcto.
REOUESTS FOR INSPECTIONS SHALL BE IIADE TI,IENTY-FOUR HOURS IN ADVANCE BY
{9 un"uor*o
t****************************************************************
TOWN OF VAITJ, COLORADO Statemnt
***************************************tt************************
Statemnt Number: REC-0093 Arnount:
Palzment Method: CHECK Notation: #1157
s3.00 ro/3L/95 11:40Init: LRD
Pernit No: E95-0152 Tl'Pe: B-EIEC ELECTRICAL PERMIT
Parcel No: 2101-063-01-047
Site Addresez 794 POTATO PATCH DR
Location: IJNIT A Total !'ees: 53.00
rhis Paynent s3.00 rotal ^3:r:il::; ut:33
****************************************************************
Account Code
01 0000 41313
01 0000 41336
Description
ELECTRICAL PERMIT FEES
WILL CALL INSPECTION FEE
Amount
s0.00
3 .00
o
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
PLUMB]NG PERMIT Permit #: P95-0110TOWN OF VAIL
75 South Frontage Road
VaiL Colorado 81657
970-479-213V479-2139
FAX 970-479-2452
APPLICANT
CONTRACTOR
OWNER
CONTRACTOR
Department of Community Development
DYNAMIC FINISHES
, vArL, co 81658
DYNAMIC FINISHES
, vAlL, CO 81658
COGSWELL JOHN & PATRICE
79iT POTATO PATCH DR, VAIL CO 81657
EAGLE RIVER PLT'MBING & HEATING
PO BOX 4981, VArL, CO 8L658
DR Statua. .
applied. .
Issued. . ,
Expires. .
Phone : 30347107 47
Phone z 30347 10747
Phone: 3033901897
.0O Total cat€ulated Fees--->
Job Address
Location...Parcel No..
Project No.
794 POTATO PATCH
UNIT A
2101-063-Ot-o47
PRJ95-0139
ISSUED
o7 /2s/Lees
to /3r / Lees
04 /28 /Lee6
Description: NEW ENTRY AND BEDROOM ADDITION Valuation:
trrhffiffiffirffi*ffif,***#****'****tffi****** FEE SUllIlARY
2, 000 . 00
Ptunbing----->
Plan check--->
Investigat i on>t,itt catt--->
Restuarant Ptan Reviey-->
TOTAL fEES-----Additionat Fees------->
Tota I PernitPayernls---------->
30.00
7.50
.00
3.00
rc.50
40.50
.00
40.50
40.50
BALANCE DUE--_ffi ffi *t*ffi ffi ***ffir***ffi**ffi *ft *****ffi****ff *ff **rr*r.ff *ffirrffi rffi rt#rrffi ffrH****ffifi
ITem: 051OO BUILDING DEPARTMENT07/25/L995 DAN Action: APPR
Dept: BUILDING Dj-vision:
ffiffiffiffit*#Hff***************ffffi**ffi**t****l****ffi*#ffirffirffiff**ffi*t***t****t*#ffi**
CONDITION OF APPROVAL
ffiffi*,r**lr**Jr****ffi*ffi**t******i****Hffi***f,ffi****ff******H****ffiffi*#*ffiffi*ffffi**H
DECLARATIONS
I hcrcby acknoutcdgc that I have read this apptication, fitt.d out in ful,L ihe information requi rcd, compteted
ptan, and statc that atl thc information provided as rcquired is correct. I agree to corp Ly riith thc infor0[t
rn lccurate D lot
to conply Hith al,l, Tovn ordinances and state tavs, and to buitd this structurr according to the Tom's zoncodls, dcsign rcviev approvcd, uniform Buil,ding codc and other ordinances of the Town appticabtc thereto.
REOUESTS FOR INSPECTIONS SHALL BE I'IADE TI.IENW-fOUR HOURS tI{ ADVANCE SY OR AT OUR CE FRoil 8:0O A[
fr,e/
and ptot ptan,
and subdi vi sion
{9*ot"uoruo
TOWN OF VArL, COLORADO Statemnt
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** * * * * * * * * ** * * :l * * * * * * ** * * * * * * * * *
Statemnt Nunber: REC-0093 Anount: 40.50 lo/3l/95 lLz39
Palrynent Method: CHECK Notation: *1157 Init: LRD
B-PIJMB PIJUMBING PERMIT
DR
Total Fees:40.50 Total ALL Pmts:
Balance:
************************************************************!r***
Permit No:Parcel No:Site Address:
Location:
This Payment
Account Code
01 0000 41311
01 0000 4t332
01 0000 41336
P95-0110 Tlpe:
2101-053-01-047
794 POTATO PATCH
UNIT A
40.50
40.s0
.00
Description
PLI'MBING PERMIT FEES
PLAN CHECK FEES
WILL CALL INSPECTION FEE
J{mount
30.00
7 .50
3.00
REprl3l I r0HN tF uArL, co-oRADa
otJt7t96 06143 REOITESE FOR TNSpECTIOH bfORK $|EET5 FOR! ltl7196
I
E6
PABE
AREAT
Act ivit y r
. Address!
Locat ion r
Parcel r
Deecript ion:
fippl icant:
Onner:
Contraetorr
E95-O152 L/I7/96 Type: B-ELEC
794 POTATO PATCH DR
UNIT A
elot-o63-t 1447
ADDITION OF ENTRY AND BEDRT}T}I
DYNAIIIC FINISHES
COEgtfELL JOHN & PATRICE
DYNAHIC FINISHES
Statusr ISSUED Constrr ADUP
Occr Uge l
Phonez 3o347t0747
Phone:
Phone: 3Jil347tfl747
Inrpeetion Request lnforration.....
Requcstorr STEUE/iIIRE mfT ELECTRIC
Req Tirer gt:6O Correntsr
Iters rcquested to be Inrpeeted...
@19O ELEC-Fi.fial
trhoner 476-4?36
Tire ExAction Corrent5
Zzp*".,--.-
Inspeetion History.....
Itorr OOll0 ELEC-Tarp. PonerIterr tililffi ELEC-Rough
.-llfiDB/g5 lnrpeetorr
- llllsfg5 rnspector:Iterr @tstD ELEC-Conduit
Iter: OOI4O ELEC-ilise.
ll/L5/93 Inspector:
11/15/95 InspectorlIter: OO19O ELEtr-Final
E6
EG
E6
EG
/- / 7 'v/'
Actionr DNAetionl AtrtrR
Actionr APPR
Aetion: AtrPR
not-nearl y-readyf4?
nptrRouED
APPRO9ED
APPROUED
I
:*i
I
Qql-o
\ t o
INSPECTION REQUES]
TOWN OF VAIL
DATE (o -'3\-q5 JOB NAME
479-2138
READY FOR
LOCATION:
INSPECTION:WED THUR FRI
B
tr
o
tr
B
o
tr
o
tr
UILDING:
FOOTINGS / STEEL
PLUMBING:
T] UNDERGROUND
B HOUGH / D.W.V.FOUNDATION / STEEL
FRAMING tr ROUGH / WATER
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
NAIL
FINAL
MECHANICAL:
B HEATING
O EXHAUST HOODS
tr SUPPLY AIR
tr FINAL
O DISAPPROVED tr REINSPECTION REOI.JIBEI
LD6 t< F ctL PC ur m B r rzil e ?fg
II{SULATION
SHEETROCK
FINAL
tr
tr
ELEGTRICAL:
B TEMP. POWER
tr ROUGH
T] CONDUIT
tr RNAL
! eeenoveo
CORRECTIONS:
tr POOL/ H. TUB
INSPECTOR
a
INSPECTION REQUEST
TOWN OF VAIL
479-2138
i 't- (..'
READY FOR
LOCATION:
t '.,u A-,f , //; !l\-Vt:<\-_ \+
I.PERMIT NUMBEF OTit
D^TE JL i /
L
--
(, ,ioa NRre
INSPECTION:
PROJ-ECT
BUILDING:PLUMBING:
tr
tr
B
tr
n
FRAMING
T] UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
TNSULATION
SHEETROCK
O POOL / H. TUB
NAIL tr
n
tr FINAL tr FINAL
ELEGTRICAL:
tr TEMP. POWER
MECHANICAL:
O HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
D
tr SUPPLY AIR
o
tr FINAL tr FINAL
l'frpp*oveo
iORRECTIONS:
O DISAPPROVED tr REINSPECTION REQUIRED
D^rE./.:-:: /!-'./ ,i
INSPECTOR
t
INSPECTION REQUEST
TOWN OF VAIL
479-2138
JOB NAME t'.*tL-(),
CALLERJ
ES ".] WED THUR FRIREADY FOR
LOCATION:
INSPECTION:
t
BUILDING:PLUMBING:
6{roo'Ncs / srEEL tr UNDERGROUND
tr ROUGH i D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
r-r ROOF & SHEER- PLYWOOD NAILING tr GAS PIPING
tr INSULATION
tr SHEETROCK
D POOL/ H. TUB
NAIL cl
RNAL FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
r] ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
tr FINAL tr FINAL
ffismoveo
ORRECTIONS:
tr DISAPPROVED tr REINSPECTION REOUIRED
INSPECTOR
PERMIT NUMBER OF PROJECT
/ /.//'DATE 'V
READY FOR INSPECTION:
LOCATION:
JOB NAME
INSPECTION REQUEST
TOWN OF VAIL
479-2138
Yr,,1- 4
tr REINSPECTION REOUIRED
tla'nppnovED .,,.::' ,tr DISAPPROVED
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D,W,V.FOUNDATION / STEEL
tr FRAMING tr ROUGH / WATER
,- ROOF & SHEER" PLYWooD NAILING tr GAS PIPING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL
tr FINAL
ELECTRICAL:
tr TEMP. POWER O HEATING
tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr FINAL
CORRECTIONS:
DATE INSPECTOR
t 3t'
-r-.
--
1., !
--- \,i: ii
rNsPEcnoN 'ieouest
READY FOR
LOCATION:
INSPECTION:
tr FOUNDATION / STEEL tr ROUGH / D.W.V.
tr ROUGH / WATER
,- ROOF & SHEER
" PLYWooD NAtLtNG tr GAS PIPING
B INSULATION tr POOL/ H. TUB
O FINAL
ELEGTRICAL:
tr TEMP. POWER tr HEATING
tr EXHAUST HOODS
SUPPLY AIR
tr FINAL T] FINAL
PPROVED tr DISAPPROVED tr REINSPECTION REQUIRED
RRECTIONS:I )t//D"
l,^^
f Qo"A F,o.rlt vn ol- f Lc;r t ,,tL
I
DATE INSPECTOR
TOWN OF VAIL
catesoryttumuer / . o""S/tSftS
Project Name:
Building Name:
Project Description:
.ot"' / -.L a,l . -' -
.
Address and Phone:
LegalDescription:t-ot /() Block - Sunaivis;i,on tJ.r^ itfudr4b ?ra/c/t ZoneDistrict 7/S
Projec'tstreetAdaress: 794,6 T*!-o tn ?nh/l M. - t':'b ,-.-
Commentsl
Motion by: 3'-- r.- I ^
Seconded ny: 6'a-' | '- - J
;[Approval
! Disapproval
I StaffApproval
Conditions:
taff Action
Vote: S-4
Town Planner
Da", 3//A/.F J u., n.-u
DRB Fee Prc-Paid .// '/ / | -
75 South Frontage Road
Vail, Colorado 81657
303-479-2 I 38 / 479-2 I 3e
FAX 303-479-2452
March 17, 1995
Richard HamPelman
1701 WynkooP St., Ste. 304
Denver, CO 80202
Deparnnent of Community Development
fllt 80P r
Dear Dich
Thank you for appearing before the Design Review Board on Wednesday, March 15, 1995 with
the proposed Ctart ZSOlaaition located at7g4B,Potato Patch Drive. The Design Review
goard has conditionalty approved the 250 request. Each ofthe conditions ofapproval must be
met prior to application foi Uuilding permit from the Torvn of Vail Building Department' The
conditions of approval are as follows:
1. That the metal railings proposed match continuously throughout the structure.
2. That all proposed building materials match the existing'
3. That a professional geologist prepare ahazard repod and that the property owners
sign a geologichazard acknowledgment form.
a
If yqr have any questions or concems with regard to the information.addressed in this letter, as
alwi"yt Uo noi hesitate in giving me a call. I can be reached rnost easily during regular office
hours at 479-2138.
Sincerely,
ru-"-*?-z'u
George Ruther
Town Planner
FI!. T coPy
75 South Froutagc Road
Vail, Colorado 81657
303-479-2 I 3 I / 479-2 I 39
FAX 303-479-2452
March 9, 1995
D e p artne nt of Con unw ity Deve lop ncnt
Richard Hampleman
1701 Wynkodp Sfeel Suite 304
Denver, CO 80202
RE: Cogswell, Clark, Ludwig and Wilson Addition
Dear Dick
stafl has completed the final review for the proposed cogswell, clark, Ludwig and wilson
Addition. Upon linal review, staff has determined lhat the items listed below are still
outstanding. Each of the items must be resolved and submitted to the oflice of Community
Development prior to application for building permit.
1. A prolessional engineer must sign and stamp lhe construction drawings for the back
garage wall as well as all retaining walls greater than 3' in height.
2. For your own protection, stafl advises that the proposed loundation wall be located by
a surveyor prior to construction to insure that the walls do not encroach into any
required set back.
A $20 Design Review Board fee must be submitted for the already approved garage
separations request.
Since the property is located in a high severity rock fall zone, a geologic hazard report
must be prepared by a prolessional geologist for the proposed garage and building
additions and a geologic hazard acknowledgement form must be executed.
Since it appears outdoor lights are proposed on the south elevation of the proposed
garage, please submit manufacturer's spec sheets for the proposed lighting.
Please submit information verifying proposed retaining wall tinish. Please be aware
that the Town of Vail Design Guidelines do not permit exposed concrete.
Since the proposed garage will cross the property line between lots 10 and 1 1, a party
wall agreement is required prior to construction.
4.
5.
/7)l_/
609'uupdueq\ero$eNe$ruFnln $l
,outtBld urnol
1re{FU e6roeg/af)
,I;erecqg
'gtl7-6Ln le slnoq ec;yo regnOer
6u;.rnp rpea gsoru potlceoloq uec I 'llec E eur 6q46 u! oleusatl lou op aseold ,s^EA{B se
'repa1 qq1 u! posseJppB uolrpruroru! eq1 o1 preDer qr!^r suracuoc .ro suogsenb [ui eneq nor( 1
-h*r/
Olign Review Action ilt
TOWN OF VAIL
8 oa" 3/r/qs
Buildinq Name: 3 n ta,t--t,n-
Project Description:
Category Number
Proiect Name:
Owner, Address and Phone:
@, Address and Phone:
LegalDescription:tot /0/tt Block / subdivision !^;J Q,4.^, '?a-lAj) ZoneDistrict ?/3
Project Street Address:
Comments:
,a ' ,., ^ L-cc.l't^ -ct, g? z €?Ft , z/zt /q<
*?"14 T-^"- o,,l . (a.
Board / Staff Action
Motion by: 6,. r Vote: 5-O
Seconded byr 8 , o-, /
fl epprovat
D Disapproval
! Staff Approval
Conditions:
-4 2 ,'
Town PlannerI
o^t"t 6/ r/?s DRB Fee Pre-paid
t.1t1..6 7ll4lga
DESTGN REVIEW BOARD APPTICATION - TOWN OF
DATE RECEIVED:
DATE OF DRB MEETING:**********
BE
*!r********. DEPT.I.
A.
PROJECT TNFORIIATTON:
DESCRIPTION:
B. TYPE OF REVIEW:
Ner^r Construct.ionuzAddit.ion ($50.00)
($200.00) Minor Alrerarion ($20.00)
Conceptual Review ($0)
c.
D.
ADDRESS:
LEGAL DESCRIPTTON:. Lot lO BlockSubdivision
If property is described bydescripLion, pldase providlto this applicacion.
a meets and bounds
on a separate sheet
legaI
and aLLach
I.
,J.
ZONING:
NAME OF
Mailing
APPLICANT:
Address:
(:APPLICANT' S REPRESENTATIVE :
Address:
VAIJUATION
,! n ?h .t n nn r\v v * J.vrvuu$ 10, 001 - $ s0, 000$ s0,001 - $ 1s0, o0o
$1s0, 001 - $ s00, 000
$500, 001 - $1, 000, 000$ Over $1, 000, 000
DESIGN REVIEW BOARD APPROVAI EXPIRES
APPROVAIJ IJNI.,ESS A BUTIJDING PERMIT ISIS STARTED.
FEE C'
O ZU. UU
$ s0.00
$100.00
$200.00
$400.00
$s00. 00
ONE YE.AR AFTER FINAIJ
ISSUED NiID CONSTRUCTION
NAME OF
Mailing
f' 't,cr:2- t CO P-C\^/^z-Phone 7O3 -53+ 4533
NAI.4E OF ObtNER (S) : Mz . T,w Ct+a-g__
OqINER(S) SIGNATVRE:
APPLICATIONS WILL NOT BE PROCESSED WITHOW O''INER'S SIGIVA"UR8
Condominium Approval if applicable.
DRB FEE: DRB fees, as shown above,\ are to be paid at. thet.ime of submitlal of the DRB applilacion. Lit.er, whenapplying for a building permit, plbase identify the accuratevaruation of the proposal . The iown of vail witl adjust thefee according to the table below, Lo ensure the correct feeis paid.
Mailing Address:
rr.
IIT
A pre-applicaE.ion meet.ing with a member of the planningstaff is encouraged to det.ermine if any additionalapplication informat.ion is needed. It is the applicant,sresponsibiliEy to make an appoinEment h'it.h the ltaff t.odetermine if Ehere are additional submittal requirements.Please note that a COMPLETE apptication witl st.reamline thereview process for your project.
In addition to meeting submittaL reguirements, theapplicant must st,ake and tape the project site t.oindicat.e property lines, building linls and build,ingcorners. All Erees to be removed must be Uaped. Ailsite tapings and sEaking must be completed piior Eo t,heDF{B sit.e visiL. The applicant. must ensure thaE st.akingdone during the winter is not buried by snow.
The revier^r process for NEw BUILDINGS normally requiresthro separate meetings of the Design Review Boardi.aconceptual review and a final review.
Applicants who fail Lo appear before the Design ReviewBoard on their scheduled meet.ing dat.e and who have noEasked in advance Lhat discussion on t.heir item bepostponed, will have thei.r it.ems removed from the DRBagenda until such Lime as the item has beenrepublished.
The f ollowing items may, aL t,he discreLion of t,hezoning administraLor, be approved by t.he Communit.yDevelopment Departmerit staff (i.e. a formal hearinqbefore Lhe DRB may noL be required) :
a. Windows, skyliqht.s and similar exterioJ chanqeswhich do noL alLer the exisLing plane of Lhebuilding; and
b. Building addirions not visible from any other lot.or public space. At the time such a pioposal issubmitted, applicants must include letcers fromadjacent properLy owners and/or from the agent. foror manager of any adjacenL condominiurn associationstaLing the associaLion approves of the addition.
ff a properLy is locaLed in a mapped hazard area (i.e.snow avalanche, rockfalI, flood pIain, debris flow,weLland, eLc.), a hazard study must be submitted andthe owner musL sign an affidavit recognizing the hazardreport. prior to the issuance of a building permit.Applicant.s are encouraged t.o check with a-town prannerprior to DRB application Lo determine the relationsnipof the propert.y to a1l mapped hazards.
For all residential construcLion:
a. Clearly indicate on the floor plans the insideface of the exterior sLruct.ural walls of thebuilding; and
b. Indrcate wi.th a dashed line on the sit.e plan afour fooL distance from the exterior facL of thebuilding walls or supporLing columns.
If DRB approves the applicaLion wiLh conditions ormodifications, all conditions of approval must beaddressed prior to Ehe application- ior a buildingpermit.
A.
ET
c.
D.
E.
F.
tovlled 224,93
Date of Application illa,^r 30 l?? S
Date of DRB Meeting_
Date of PEC Meeting (if necessary)_
APPLTCATTON FOR ADDTTTONAL GRFA (2s0)
JAtt 3 0 1es5
lur-rj0Mlf4, Dtv, uf
1t.
{t
APPLICATION INFORMATION
PHOJECT DESCRIPTION
B. LOCATION OF PROPOSAL:
Address
Legal Description:Lot"llL Block-..t1 - Filing Wlt-/ plraro P4rr
NAME OF AppLtcANT. Mc. Toux 1no.-eu_ / ft{a fu
D.NAME OF APPLICANT'S REPRESENTATIVE:
Address
NAME OF OWNER(S):
Zone
c.
Address
tr.
ra Slgnature(s)_
Address '*tt- Bl6raF. Filing Fee of $200.00
request involving an EHU, the fee is waived.
frrt6."e 14 tsub fd
PUBLIC NOTICE
NOTICE lS HEREBY GIVEN that the Design Review Board will be reviewing the following
application on March 15, 1995 in the Town of Vail Municipal Building.
1. A request for an additional 250 square feet of Gross Residential Floor Area for an
addition of a study to the entry level, an expansion to the living room and an expansion
to the guest room at the Cogswell Residence located at 794-8 Potato Patch DriveAot
10, Block 1, vailPotato Patch.
Applicant: Cogswell, Clark, Willson and Ludwig, represented by Richard
Hempleman
The applications and information about the proposals are available in the zoning
administrator's office during regular office hours for public inspection.
TOWN OF VAIL
COMMUNITY DEVELOPMENT
Published in the Vail Trail on February 24, 1995.
DATE: 3/r,
LEGAI, DESCRIPT
ADDRESS:
O$INER
ARCI{ITECT
ZONE DISTRICT
PROPOSED USE ' L't lZ-
r,or srzE 3n,ls3 P BUTLDABIE Lor
'\REA
r.reiqht.
Tol-al CRFA
Primary GRFA
Secondary GRFA
SeLbacks
Si t,c Covcrage
Lanclscaping
ReLaining waIl
Parking
Caragc Credic
Drivc:
Complies wiLh
wal-cr Coursc Sel-bacl(
Do Finish Gradcs Excecd
Environmen t a1 /IIazards :
(30) (s0)
2:t (50%)
74 A
lel0
Sing1e F
o
amil
ZONE CHECK
. FORy Residence, DupLex, Pr
ZONE DISTRTCTS
t
imary
Block -Subdivision V^. / ?ot. i- 7^ l" /l
PIIONE
PIIONE <24 - t/53t
Exi s Linq
,/Secondary
Allowed
(30)(D
ProDosed
DV-
Total
o
sz83t0e'TJliei gss d + qq-r 'i
Sllt__ + w =-3EH- /4rs 1n 4' ' '1' | = fr354
't14 + 425 =JjAi- 4 tss 4 578F ZJ1S!ZZ=113V
rzs z1tf 0 . 1,.,t
-
Front Fsides 15' /<'/ l1 '
Rear !5' > l5'
613l d 5za1 4
Ircishcs 3'@ l!'
/'neqra / S encl
'-tu I @3o+ Lq6 ' SLot rcoot tgoovfuzs i o<ez 23 d
71q6 SzLt d+LqB iZL ' -'(--',"- (b?Ft+\
PcrmiEued slope lO a Proposecl Slope /O %
T.O.v. Lighting Ordinance Yes No
4) wetlands nra
view Corridor EncroachmcnL: Ycs- No----d4--
Does t,his reqriesL invoive a ZiO ridriiliorr? VE< . ,nt r
IIow muctr of Lhe aLl-owed zso laaicion-is useffiuttis rcquestz l1Afi
Prcvious condiLions of approvaI (check properLy file):
1q4 A -, ilt>o;n:<x-l
NO_da__
1) Flood Plain aL
nu z<J'/"2l PercenL slopc (< >
3) GeoLogic ttazardsa) Snow nvaLanche
,nL
YES
b) Rockf alL . Hi,lt.. .c) Debris FIow nrz
-r
114 6 + y'w;no,.-t ,,.t1 ZQ)
10
4'o
TOWN OFVAIL
75 South Fronnge Road
Yail" Colorado 81657
303-479-2 I 3 I / 479-2 I 39
FAX 303-479-2452
Ivfarch 16, 1995
Departn.rent of Comnuniry Deve loptnent
F,l.t c0Py
Richard llamplernan
l70l Wynkoop Street, #304
Denver, CO 80202
Dear Dick:
Thank I'or for appearing before the Design Revierv Board @RB) on \Vednesday, March 15, 1995 with the
proposed garage iaaition located on lots l0 and I l, Vail Potato Patch; 792 and794 Poato Patch Drive.
iJpon nnal revlerv before the Design Rer"ierv Board the project rras approved I'r'ith conditions. Each of the
conditions placed upon the approval by the DRB must be resolved prior to application for building permit.
The conditions of approval are as follorvs:
l. That a professional engineer sign and stamp the construction dralr'ing for the proposed rear garage
nall and all associated retaining u'alls.
2. That rbe proposed color of the concrete keyed rrall be submined to stafffor their rerierv and
approval.
3. That the proposed color of the stucco and n'ood trim for the garage be submitted to the stafffor
their revierv and approval.
4. That the proposed exterior ligbting be resubmitted to staff for their revierv and approval.
5. 4.-. That a professional geologist prepare a hazard report on the proposed project and that the"ipplicants sign and date a geologic hazard acknon'ledgment form.
Agairl thank 1'ou for appearing before t}e Design Rel'iew Board rvith the proposed garage addition for lots
l0 and I l, Vail Potato Patch. If 1ou have any qucstions or concems uith regard to the information
addressed in tlris letter, as aluays, please feel free in giving me a call. I can be reached most easily during
regular office hours at 479-2138.
Sincerely,
H***- ?--rl-a
George Ruther
Town Planner
f:\?r,t','oid8co68r'l!d!t \h|r|rplc.3t 5
o
BESTCOPY
A\IMELE
L
rffl0'u\tN0c'ilt
Iff FEnrytt APP&TCATION - TOI{N OF VAIIJ, COLOR.aDO
DATE RECETVED:
DATE OF DRB MEETING:**********
A.
B. TYPE OF REVIEW:
New Construction ($200.00)
Addition ($50.00)
$( uinor Alt,eration ($20.00)
JConceptual neview ($0)
**********
DESCRIPTION:
z4/'
C. ADDRESS:
D. IJEGAL DESCRT
Subdivision
ff property
d.escription,
t,o this appl
PTION: Lot
is described by
please provide
ication.
Block I
a meets and bounds
on a separaLe sheet
legaI
and attach
G.NAI'{E OFuailing
APPI.,ICATiIT:
Add,ress:
APPLICANT'S REPRESENI
Address:
E.
F.
zoNrNG: t"il ^
NAME OF
Mailing
Phone
ATrVE: *u, ffionngl ..'z
Phone
H. NAITIE oF OI{NER lil : ^l oh n *D#nt (o?< c.-< ((
O'INER(S) SIGNAIfiTRE:Mailing Address:
Phone
APPITICAIIIONS WIIJL NOT BE PROCESSED WITHOW OWNER'9 SIGMIEIRE
Condominium Approval if applicable.
DRB FEE: DRB fees, as shown above, are to be paid at thetine of submittal of the DRB appLication. Later, when
appLying for a building per.mit, pLease identify the accuratevaluation of ttre proposal . The Town of vail will- adjust thefee according to the Eable beIow, to ensure correct feeis paid.
I.
,t.
FEE SCHEDUI-TE:
VALUATION$ 0 $ 10,000
a .tn ,1n.t a Fn ,\,r,tV Lwtww- V -rwtVlJvs50,001 -$ 150,000
$150,001 - $ 500,000
$500, 001 - $1, 000, 000$ Over $1,000,000
DESIGN RE\'ITBII BOARD AFPROVAIJ AI(PIRES
APPROVAIJ I'NIJESS A BUIIJDING PBRUTT ISIS STARIBD.
FEE
$ 20.00a -tr ^^rP Jv. V\,
$100.00
$200 . oo
$400.00
$s00.00
ONB YEAR AnfBR FINAIJ
ISST'ED Al{D CONSrRUCTION
?It
oo
-€
L*j
r {\'-) Irl
z:l
B
\
*
Y
-+{-\ 0l
.o iNQcr"t-ir
is-'0 int!r'!
itzwlu
$p{
_.___l
.(
I
o
:
I
I
I
I
I
I
llt:'---'t--- -I
I
I
I
-L
I
I
I
I
I
I
I
{
I
I
I
I
I
_l
l--l
F';'
7 /-\.
*;
7
:{r
-cb
\
.Q\
t4
N
oo
I
I
I
:"1tl
,,1
lilg--ll
Lr
II
tx-_J
-t lt
il
LII IJIJL-J;ffi#
illillrl
rt*_--
I
I
l--p'-'
l-\
l:-,. ;--i-'---'-i
t
.-.._
( t^t
\._1
r-- J
li
z
rJ
!.4
$
+l---L3-5€" If::-1l-!.--=--.-:l
tl'?-+ .-- --
i
ilril-+--*.,1 1-1 .,-r z^rll' ' i--r--l -_ -T-,!;t .lUt!
R li;iiT=r;
tii Fr+i
l/r,_+_:_JJ
r I-lii;5-1'i.'r ti--._=_J
- \:-
-
__.---_,i\
i /1j. ,i.-''l -' '''a"
i t',,
i;\!l\li 'ri
:,
.l: l-
i.l
,'--J !{:,( {j
I( 8:r\ t/,)' pi
\ r'. t,
" ttlii r6li-z si i,-1--fr
"-1.-r,l
I
i"1 -
i
li
t;ti
II
it
I t,l'
v
iL
,r.t-rfi
!l
.x uorr or lal.l
-: 'rlas-r
-t
.+ ilul
fi,!o"i
n+
n l.g" I \- l/c l/.Y
_.1fJ
Itli'!
Vr
{t)
ii
tl
1l
)
1.
'5.o
:,i
o
.1
i:
C.
{
1!'
c
I
n
lo
tC
JTT
'!
rt
c
1
;'
1:
{1
i)
-t(_j {').r -'Oa! -O
i5;.:j lli:-
:<;:
'a
o :.:
()a
c-irob?.F"
oo.
r;'
,.7:,
o--T,.;-
i
I
-o
;n,
:
a
I_-{..
..1<.rl
.- .tl
)-jtly-\" -'
,1 11 1f\ ,1
Ll lir'-l
/a\
l\'- ---1"'-...:
t\l
/:l,\ i
et l-lt \_,-rrr1-r
f1)
r-}r--.
z
r{
yl
s
s{
\
"j ..\.
'.i I I,i ! .1. I
tr
v
-rELtF{ 0F trFt r L
Hiscel laneous Cash
1B-E5-FF lt; r:rFr f,4
F;eceipr * lFjl4tl
!:-..o,.1"t S r-.1: # tlll
::fliijt:* Firir+rEsrreEpnrrr rlFiB FEEHrrif-'Lrn i. i.*nd* r*,J :: iB. BE
Itero paid BrEt.r.,t F€id
tllfiEgE4tf,f,lfEr0
?r:1. llff
ti:fi.:nge re tu rne,J l, 1'1, E1rl
THF|r.il< vou
,ir,:u r r;=hi*r HEIDI
n
"^>a \--"'\-.-
lJ
rl Oegn Review Action Foal
TOWN OF VAIL
i-.}
Category Number /z o^t" 1,r/ t6f qs
Project Name:
Building Name:
Project Description:
Owner, Address and Phone:
nr"niteclg#tlhodress and Ph one:
Legaf Description:tot /Df tl Block / subdivision Torl+o ?*fteh zone District 7/3
Project StreetAaaress: 712 f '79^/ 7orl'rc 74rr h
Comments:
Boar
Motion by:
Seconded by:
Conditions:
! Approval
a Disapproval
fl starnpprovat
DRB Fee ere-eaia 1{). o'r?'J
JUN-12-1995 15:lE,
t.rtlA lllllL
DESIGIII AEI'EEYT EOARD APSLICATIOH
PBO{SCT rNEoS$MrQE:
DESCBIPTIOTV:
I'
ai
rottN oF vAItJ'
I
. DEY.
t.
n.
c.
D.
a meeis and bounds legal
on a separaEe sheet and att'ach
E.
F.AFPLICANT:.
Address:
Phonc
NAI,IE OF
uailing Addrcss t
Af'PLICANT'S REPNESE}'ItATIVE:'br
74?6
(/ll.NI\ME qF ol.fNER(S) :
Ma i I ing lrddress ;3 V t*t <-
,l(
FEE
' | 5v'uu
$ 50.0o
$100.00
0200,00
f400. o0
$500.00
OilE TEAR lfltB& FIlllIr
lSSttED lJilO coNs'frrlc'lroN
PhOne
I,
J.
APPLtcAltroNs rrll IvOf AS PffocEsSED WIWow ot{fiER' S Sro[rTURB
Condominium Approval if applieable-
DRB FEE: DRit feec, as shown above,l are to bc paid at the
uirra of aubmiutal of the onu appfila[ion. Lilt'Gr' wben
applyinS for a building pcrrnit. Plbasc ideneity_-Ene accurate
valuation of the propoiri, The t''orryn of Va11 vtill adjggf _Ehefle ac"oraing to ine'tabte belsr'r. to ensure lhe correct fee
.1,D14
FBE SCHEDUIJH:
VAI,UATTONc 3 i0,000
$r0,001 "$ 50.000
t50,oo1 '$ 150'000
t150,001 - $ 500,000
0500,001 - $1'000,000S Over $1. 000 ' 000
DESIGN Rh':TEi' AOARD APPROVAL EXPIRBS
TPPROVAIJ 1INLBSS i| BUILDING PER!|IS I8
IS SIANTED.
P.@
TOTFL P,A1
Jt.bF12-1995 lEl:EE
,.,'a,{A4(
Drt:rE RECEtvEo: -------J{+l.fl'fi95DATE oF DRA MEETfNG' #
W
trfll
I l. lE E EJl v . ,t' \r,.h]
6"f iot oN 'Ta,b P/fiattvtticl"n<42-y Qf tfruf,
B.rYPE OF EEVIEWI
New consLruction ($20g.00) -4S#inor
AlterlliJl- t$20'001
AddiLion ($50.00)
-eonceptua]
Revlstf ($0)
I\DDRESS, !3
LEGAL DESCRI,PTLON: I,OI.-TL!JJ- EIOCK
-qubdiwision ?'o trr4o I-A
4\ZONING:.UV'nte4.---+
NAr.rE oFMailing
tf propertY is describcd bY
destription, Ptcids€ Provideto this aPPllcat5'on.
is paid.
9?/,
TOI,JH (]F UF| I l-
Higcel laneors CaEh
86- 14-'Jl Et'l: 84 : .l?
F:*c*iF,t * 1;5493
B€,:L"iLint + l:Fl # 1ff?8
rJ'itlfri'lI C F It'ltEHE5\'FREFF| ltl
ffrri,:r-rrr t tr€nde r€d 'l
lr.ern Paid
BlEBF-164133188Ei
l:harrge re t u rned ]
T)RB FEE
.JE, BEI
frmrlnt Paid
IE. Et'J
e. Fr1
THFT.TH \/OIJ
Taur c.:Ehier HEIIII
nEcElt't- ThcTown of Vdl
N9
e'trfiNrmb.nffi
OYf PAD-e$'-*l
I D
TOWN OF VAIL
ARTMENT OF COMMINITY I}EVELOTMENT
ibh.{^/,/ t_g{
DA'E @ ,L9,'- t
CHECI(S MAIIE PAYAILE TO TOWN OF VAIL
\Pi\
ACO| UTiTn|o. v r|Ilt ll(I Trx oaTla lluTal-
0l 00004r540 ZONTNG AND ADDRESS MAPS $5.00
0l 000042415 UMFORM BUILDING CODE t;54.00
0t 0000 424r5 UNIFORM PLI,TMBING CODE $39.00
0l 0000 424 l5 UNIFORM MECHANICAL CODE $37.00
0t 0000 42415 I.JNIFORM FIRt CODE $36.00
0l 0000 424 I 5 NATIONAL ELECTRICAL CODE $37.00
0l 0000 424 | 5 ()t lth,R coDh. tsooKs
01 0000 41548 tsLUE PRINTS (MYLARS)$7.00
0l 0000 42412 XEROX COPIES $0.25
ot o00o 42412 STUDIES
ot oooo 42412 I OVFEES COMPUTb,R PROCRAM $5.00
0l 0000 42371 PENALTY FEES i RE.INSPECTIONS
0l 0000 4t332 PLAN REVIF.W RE-CHECK FEE t$40 PER HR.I
ot 0000 42332 OFF IIOURS INSPECTION FEES
0l 000041412 CONTRACTORS LICENSES FEES
0l 0000 4 l4l3 SIGN APPLICATION FEE s20.00
0l 0000 4l4l3 AIILIII'IONAL SICNAGE FEE tSI.OO PER SQ.FT.I
0t 0000 41ll40 r' I C' ARI- PROJ}.,CT DONATION
0l 0Q'0o,41331 }BE PAID DESIGN REVIEW BOARD FEE I a7)<Jo0l 00tffi23tT II.N/ESTIGATION FEE ( BUILDING)
3 I 0000 451 l0 TOV PARKING FUND
ot oooo 22027 TOV NEWSPAPER DISPENSER FUND* 0t 0000 2l I 12 IAXABLE Cd 4% (STATE)* 0t 0000 41010 TAXABLE @4olo (TOWN)
0t 0000 42371 BUILDING INVESTIGATION
)THER
r,EC APPLICATIQN FEES
0l 0000 41330 ADDITIONAL CRFA "250'ti200.00
0l 000041330 s200.oo
01 000041330 EXI'!,KIOR ALTERATION .ILESS TT{AN IOO SO.FT.I !i200.00
0l 0000 4t330 EXTERIORALTERATION TMORE THAN 1OO SO.FT.I $500.o0
0l 0000 41330 SPECIALDEVELOPMENTDISTRICT INEW]$ 1.500.00
0l 0000 41330 SPECIAL DEVELOPMENT DISTRICT MAJOR AMEND $1,0w.(ru
0l 0000 41330 SPECIAL DEVELOPMENT DISTRICT IMINOR AMEND $200.00
01 0000 41330 SUBDIVISION
0l 0000 41330 VARIANCE $250.00
0l 000041330 ZONING CODE AMENDMENTS $250.00
0l 0000 41330 RB - ZONING $200.00
OTHER
ITOTAL:
C()MMENTS:
.-/x )
CASE t-r cr.*r l M.OLl *".. "t' W
-
-=----O|tgn Review Action Foln
TOWN OF VAIL
O .al t
catesory ttumoer d oate 5/i/95
Proiect Name:
BuildingName: 3 - g -9tt
Proiect Description:
Owner, Address and Phone:
@, Address and Phone:
LegalDescription:tot lLfn Block / subdivision !;J ?oL-,/ %.-l.cj) zoneDistrict 7/3
Project Street Address:
Comments:
*.44 D-^-. 'a , (o.
Board / Staff Action
Motion by: 6-2. I Vote: 5-f)
Seconded ny: 8 : -, ,/
y' noorovat
fl Disapproval
! StaffApproval
Conditions:
Town PlannerI
oa", t7/ t/q< DRB Fee ere-oaia 2.@ --.ra.Jtf
oo
Fzt!
=Fc
ulo
I
I
I
I
I
I
I
I
I.A
NI
\-\l<l
I\st.\l.JI<l
I
I
I
I
fi
F2
E. ,ff:
.
l
z
tr
E
a
uJo
-F E.
-[<
I
zo
(!
tr
Oa
UJo
-F (r
-LL
l
z
tr
E()
v)
uJ_o
E_f
l
z
F
cc
U)
uJo
-F II_tr
z
tr(L
Eoa
t.lJ
F
(L<
z
trcEoa)ulo
FEf
.":
F!
zo
F(r
cc
a
uJ
Ft
#
1.t
'',
'ti
za't
tr(!
Eoa
uJ
F(r
tr
zo
F(r
cc
Oa
Lll
Fcr
tr
rr (r
NH
H=3A
JFtz
ul a\zii
IJJ XOY
z
LIJ;
lJ- tt
X
U,l
Ltl
<acr-
F!{
==
ccLUIt=
z
coQ
a
2f,
>oFUJ
&E
zo)z
E
iiNgu)
o(oC')F^
E olzot $l
s i:(').E ONE6t3:0psu
t!z>-
<ultu(l
alHE<ln>Xcc.rrt!
uj "d !J
=fio)a-az4+
Al".tr4tr
?
uril
i'-.
{:
;.1
rJ'
m
tL
t-
' t:'
.t-
f..l
:.:{t rr!
lil ill ti!
..1 l-J
il- lr. iLl
L i.'.l l:1 !:l
il
'r :i it
.l- ;i
'.r i iil
'.::. ' I t T_]tlt,,l
l-..1
lr.JJ .r IIr0 |t>ltlltlIl(, It*lLL-I
E
oz
LU
(5z-I
o
zI(Io
It
=o6
zclo
o
(Lo
oz
i :' t..:
;."r ii:
l'l 't':'r i-tr
i:.r { f|' ull
-.) L .tj
-i '{ r.'i '... .t .. i,r
rl .
l: ...
:': itr ...l
t t -,:i.,i.
. .- tl .1
ig.rI
Ia
l-i
i ,.!
Itl
ii
fl
."i
:1-
i-i
,-ll
tl,*
Lll
zatrtll
l(I)
ogg()
o..
k
e
o
o
ul
A
=(.,
o.
ZY< :.,
Yg
=5
9c
z
6
=
=
o2
u{
E
tuo(ro
[rJa
-O'
E.f(L
UJ.|d)]d>-:)2
(rcr
YXi2=uJf>2
ci'z
uJ
C')
FJ
UJl-
o
llJ3o
IJJko
UJ
,#q1
7ccD'(lV>o
Jevl'f,d UUng
Date of Application iXa,nr 30 l??5
Date of PEC Meeting (if
APPLICATION FOR ADDITIONAL GRFA
TYPE OF REQUEST
Standard 250
Type I EHU 250
Type ll EHU 250
Type V EHU 250
II. PRE-APPLICATION CONFERENCE
A pre-application conference with a member of the planning staff is strongly encouraged to
discuss the provisions under which additional GRFA can be added to a site. lt should be
understood that this ordinance does not assure each property an additional 250 square feet of
GRFA. Rather, the ordinance allows for up to 250 square feet if the conditions set forlh in
Chapter 18.57 or Chapter 18.71 of the Town of Vail code are met.
Applications for additions under this section will not be accepted unless they are complete.
This includes all information required on this form as well as Design Review Board submittal
requirements.
III. APPLICATION INFORMATION
A. PROJECT DESCRIPTION
rOit
7f@.6.C.€ P.F*\
Aee &'ax.e e{ A
B. LOCATION OF PHOPOSAL:
Zone
c.
Address
Legal Description:Lot1l1\BlockJl FitinS WIt-/ parAro P+lzct(
NAME OF APPLTCANT: Ma. -JauN /no"-eu- / k{R fu
pvlrlrreu 7?4 4 o^l 44 E po.^ro po.-r, Dz.
D. NAME OF APPLICANT'S REPRESENTATIVE:
Address l-7ot u/lNlrme <T t 7A
NAME OF OWNER(S)._.,E.
It Slgnature(s)
Phone_,- 47O-7o4 |
F. Filing Fee of $200.00 is required at time of submittal of a standard 250. For a
request involving an EHU, the fee is waived.
Address
lk tg|(o tA ,
A'aru Bl6ta
The following information, in addition to DRB submiftal requirements, shall be required with
this submitlal:
1. Verification that the unit has received a final certilicate of occupancy.
2. Stamped, addressed envelopes and a separate list of adjacent property owners
and of owners ol units on the same lot. This information is available from the
Eagle County Assessol's office.
3. Condominium Association approval (if applicable).
4. Existing or proposed floor plans of structure.
G. Your proposal will be reviewed for compliance with Vail's Comprehensive Plan.
H. lf this application requires a separate review by any local, State or Federal agency
other than the Town of Vail, the application fee shall be increased by $200.00.
Examples of such review, may include, but are not limited to: Colorado Department of
Highway Access Permits, Army Corps of Engineers 404, etc.
The applicant shall be responsible for paying any publishing lees which are in excess
of 50% of the application fee. lf, at the applicant's request, any matter is postponed for
hearing, causing the matter to be re-published, then the entire fee for such re
-publication shall be paid by the applicant.
Applications deemed by the Communi$ Development Department to have significant
design, land use or other issues which may have a significant impact on the
community may require review by consultants oiher than town staff. Should a
determination be made by the town staff that an outside consullant is needed to review
any application, the Community Development Department may hire an outside
consultant, it shall estimate the amount of money neoessary to pay him or her and this
amount shall be fonrvarded to the Town by the applicant at the time he files his
application with the Community Development Department. Upon completion of the
review of the application by the consultant, any of the funds fonrarded by the applicant
for payment of the consultant which have not been paid to the consultant shatl be
retumed to the applicant. Expenses incurred by the Town in excess of the amount
lonnarded by the applicant shall be paid to the Town by the applicant within 30 days of
notification by the Town.
/,-rotta
,y 1-.-J'Lt"'
/,b.* l.*, . 7t u'-'
0 I -, 'no -4 t v7,-,14fivtr"t"o" r-r '4'e
,uf*uo''''7 o
fJ-"'..'''(* nc '-,/ ?'tY
2so"
t
oedfi'Reuew Action rorm I I
TOWN OF VAIL
.'
Category Number /Date
Projec't Name:
Bullding Name:
Project Descrlption:
Owner, AddrEss and Phone:
LegalDescription:Lor /O Block - Subdivlsionxla)J ?c,/+ te, A !t'/lzongDistricl U/t
eroieastreteaoraes: 1% 4 ?nt^-/a 4; t^ lt l:",
CommEnts:
@sorff Acuon
Motion by:E*--^--vo;rl: €'?
FLAPProral
I Disapproval
I tr SffiApproval
Seconded by:
Conditions:
on"' 5/ t/qs:
o
TOWN OFVAIL
75 South Frontage Road
Vail, Colorado 81657
303-479-2 I 3 8 / 479-2 I 39
FAX 303-479-2452
March 16, 1995
D e par trne nt of Communiry Deve lopment
Flif F nnqtv
F lji-8- *.. i ,
Richard Hampleman
l70l Wynkoop Street, #304
Denver, CA 80202
Dear Dick:
Thank you for appearing before the Design Review Board on Wednesday, March I 5, 1995 with
the proposed Cogswell addition located at794 LPotato Patch Drive.. The Design Review Board
has conditionally approved the addition. All conditions made by the Design Review Board must
be met prior to application for building permit from the Town of Vail Building Department. The
conditions of approval are as follows:
1. All proposed materials must match existing.
2. The proposed metal railing must be continuous throughout the structure.
3. A hazard report must be prepared by a professional geologist and a geologic hazard
acknowleCgment form must be executed.
iaF
Ifyirfi-have any questions or concerns with the regard to the information addressed in this letter,
as always, please do not hesitate to give me a call. I can be reached most easily during regular
office hours at 479-2138.
Sincerelv.
fL"+Q-P-,t
George Ruther
Town Planner
tbvervonc\george\letter\hample 1.3 I 6
Ff L t c0Py
75 South Frontage Road
Vail, Colorado 81657
303-479-2 I 38 / 479-2 I 39
FAX 303-479-2452
March 9, 1995
De partme nt of C omnuniry Deve lo prnent
Richard Hampleman
1701 Wynkodp Street, Suite 304
Denver, CO 80202
RE: Cogswell, Clark, Ludwig and Wilson Addition
Dear Dick
Staff has completed the final review for the proposed Cogswell, Clark, Ludwig and Wilson
Addition. Upon final review, staff has determined that the items listed below are still
outstanding. Each of the items must be resolved and submitted to the oflice of Community
Development prior to application for building permit.
1. A professional engineer must sign and stamp the construction drawings for the back
garage wall as well as all retaining walls greater than 3' in height.
2. For your own protection, staff advises that the proposed foundalion wall be located by
a surveyor prior to construction to insure that the walls do not encroach into any
required set back.
3. A $20 Design Review Board fee must be submitted for the already approved garage
separations request.
4. Since the property is located in a high severity rock lall zone, a geologic hazard report
must be prepared by a prolessional geologist for the proposed garage and building
additions and a geologic hazard acknowledgement form must be executed.
5. Since it appears outdoor lights are proposed on the south elevation of the proposed
garage, please submit manufacturer's spec sheets for the proposed lighting.
6. Please submit information verifying proposed retaining wall finish. Please be aware
that the Town ol Vail Design Guidelines do not permit exposed concrele.
7. Since the proposed garage will cross the property line between lots 10 and 1 1, a party
wall agreement is required prior to construction:
o
o0o'uupduroqsrouoNorltn \ouorb^et;l
JoulrBld u,tiol
'reqpg e6roegr
/-trf).-q*1/
'{;elecu6
oulrnp {1see rsour pe'c'or os uBc'rpc u e, Eu^o r';ffi':*ifi"tff'JrlXil'ff#ll?
'Jaual slql ul pgsselppg uollpurlolul eq1 o1 pre6er qum sulecuoc.ro suogsenb rue eneq nor I
HAMPLEMAN ARCHITECTS
l70l Wyn koo p Street, Suite 304Oenver. Coloredo 80202
(303) 534-4533/ FAX (303) 531-5227
March 13, 1995
Town of Vail
75 S. Frontage Road
Vail, CO 81657
To: George Ruther
Re: 7921792 Potato Patch
Dear George,
This lefter confirms our conversations of last week that concluded that the slope for 794
Potato Patch is less than 30%. Therefore the site coverage may be 2006; which is
substantially less than our design requirements, and no square footage deductions are
needed. Also to confirm that the Cogswell's will be refunded $ 250.00 because the square
footage adjustment was not needed for their property.
I am also responding herewith to your letter dated March 9, 1995.
Item 1.We have been working with Boyle Engineering, Inc. on the project. He will
be designing and stamping all structural drawings; including the retaining wall/garage wall
design.
Item 2.
construction.
Item 3.
Item 4.
acknowledgements.
Item 5.Enclosed herewith are cut sheets for the exterior garage lights.
It is our intent to have all proposed walls verified by our surveyor prior to
We will submitted the $20 review board fee to you as soon as possible.
The owners have begun this step. They will provide required
o
page 2
Item 6. Our intent is to use a keyed block retaining wall system. I believe these are
of a type approved by the Town.
Item 7. A party wall agreement will be executed after the review processes, and
bidding process are completed and prior to construction.
Thank you for your help throughout the submittal process.
Sincerely,&
Richard Hamplemad
Oes|r Review Action
TOWN OF VAIL
Projecl Name:
BuildingName: 3 z 1,., - n.t
Project Description:
Porro
O 'al tcatesory Number d oate S/t/eS
Owner, Address and Phone:
Legal Descriplion:tot /O/tt Block / suoaivision rLil ?n4-,+n Za-Lcjl ZoneDisrrict O/S
ProjectStreetAdarcss: 79'//tqz ?a-ln-Zo A** t, :,-,
.A ld- . .*' Z ue t ' -.'-, _.t t, 9? €?Fn , Z/'-t'e<
Board / Staft Action
z-t
Molion by: 6 'r a--rt Vote: 5-l:)
Seconded by: 8 : o, ./
![ Rpprovat
! Disapproval
! StaffApproval
Conditions:
P4 .4Ft - ,u -(,t' /
Town Planner
Lo*"t ,3r/ t /?<DRB Fee Pre-paid
r.vr..d, 7 /14/94
DESTGN RSVIEW BOAND APPIJICATTON ' TOT{N OF
DATE RECETVED:
DATE OF DRB MEETTNG:
I.
A.
PRO.IECT TNFORMATTON:
DESCRIPTION:
*!t*tt***tt*
'NL,
TYPE
NZt
Il OF REVIEW:
ew ConsEruction ($200.00)ddiLion ($50.00)Minor AlteraE.ion
Conceptual Review
($20.00)
($0)
D.
ADDRESS:
I,EGAL DESCRIPTToN: LoT Io Block Isubdivision V*tt- / ?ffi+-r,
-
If property is described bydescript,ion, pleiase provideLo this applicat.ion.
a meeLs and bounds
on a separate sheeE.
legal
and attach
E,
F.
I.
,J.
ZONTNG:
NAME OF
Mailing
APPLTCAI\I1I:
Address:
APPI-,ICANT' S REPRESENTATTVE :Address:
NAME qF OWNER(S):
OIINER (S) SIGNATVRE:
Mailing Address:
is paid.
FEE SCHEDULE:
VAIJUATION
,h .1 ,h ,r.r .|r\nv U |p J.V, \ruv$ 10, 001- - $ s0, 000
$ 50,001 - $ 150,000
$1s0, 001 - $ s00, 000
$s00,001 - $1,000,000$ over $1, 000,000
DESIGN REVIE$I BOARD APPROVAI., EXPTRES
APPROVAIJ IJNIJESS A BUTIJDING PERMIT ISIS STARTED.
Phone 3o? 'q3'+-+tZ3
FEE
iD ZLI . UL'
$ s0.00
$1 00 .00
$200.00
$400.00
ss00.00
ONE YEAR AFTER FINAL
ISSUED AI{D CONSTRUCTION
NAME OF
Ma i. l ing n€47
APPLICATIONS WILL NOT BE PROCESSED WITHOT]T OWNER'S SICNATURE
Condominium Approval if applicable.
DRB FEE: DRB fees, as shown above,\ are t.o be paid at. L.het.ime of submitral of the DRB applilacion. LlLer, whenapplying for a building permiu,-plbase idencify Lhe accurarevaruation of lhe proposal . The iown of vail will adjust t,hefee according to the table berow, to ensure the correct fee
u)'&r,^
@/
?0
ITT
III
A pre-applicat.ion meet.ing wir.h a member of t.he planningstaf f is encouraged t.o det.ermine if any addiLionalapplicat.ion informaLion is needed. It is che applicant,sresponsibility to make an appointment. with the staff todet.ermine if there are additional subrnit.tal_ reguiremenlF.Please not.e that. a COMPLETE application will st.reamline Chereview process for your projecL.
In addit.ion Lo meeLing submit,t.al reguirement.s, Eheapplicant, must sLake and cape the project site t.oindicate property lines, building lines and buildingcorners. All trees to be removed must be taped. AtlsiLe Lapings and suaking must be complet,ed piior Eo t.heDRB site visic. The applicant must ensure thac stakingdone during che winter is not buried by snow.
The review process for NEW BUILDINGS normally requires
Cr',ro separate meetings of the Oesign Review goard:.a
concept,ual review and a final review.
Applicants who fail to appear before the Design ReviewBoard on their scheduled meeting dat.e and who have noc.asked in advance t.hat, discussion on their item bepostponed, will have their iLems removed from the DRBagenda unLil such Eime as Lbe item has beenrepublished.
The following iLems may, at. the discreLion of thezoning administraLor, be approved by Lhe Communit.yDevelopment Departmerit. staff (i.e. a format hearingbefore the DRB may noL be reguired):
a. Windows, skylights and simiLar excerior changeswhi.ch do not aLter the exist.ing plane of thebuilding; and
b. Building additions not visible from any other lot.or public space. At the time such a proposal issubmitted, applicanrs must incLude lelters fromadjacent property owners and/or from the agent foror manager of any adjacenL condominium associationsLaLing the associaLion approves of the addition.
If a properLy is 1ocated in a mapped hazard area (i.e.snow avalanche, rockfall, flood p1ain, debris f1ow,\^retland, eLc. ), a hazard st.udy musL be submitted andthe owner musL sign an affidaviL recognizing Lhe hazardreport prior to the issuance of a buildinq permit.Applicant.s are encouraged to check with a-r6wn piannerprior to DRB appLicat.ion t.o det.ermine Ehe relationshipof t.he property to all mapped hazards.
For a1I residential const,rucLion:
a. CIearIy indicate on Lhe flgor plans the insideface of the exterior sLructural walls of Ehebuilding; and
b. Indicate wiLh a dashed line on the siLe plan afour foot distance from the ext.erior facL of Ehebuilding walls or supporLing columns.
If DRB approves the application with conditions ormodificaEions, alI conditions of approval must. beaddressed prior Lo the applicat.ion- ior a buildingpermi t .
A.
B.
c.
n
DAIE: 3/ct/q<
LEGAL DESCRIPT
ADDRESS:
OWNER
ARCI{ITECT
I ZONE CHECK
. FOR
Single ramily Residence, DuPIex,
ZONE DISTRTCTS
Block -Subdivision
ZOnn nfSfRTCT'?'-n+-,,.--, r/ / 3--'"- ",'-J*.'^-t/'
PROPOSED IJSE ?/2.,
All-owed ExisLinq Proposed Total
HeiqhL (30)(D DL nlb-urr
roLal .RFA sz*ltffi,llljZi qss d + qq1 6 4 ^.O\d\primary GRFA 3ll1--+ 42s =-,389c- '4tS 1n+t ^'ftr=wsl
secondary GRFA'tt4 + !2s- =J1,frA't356 57aF zJlS-tE=2:'g,54
rzo Z-l& 0 n t.t :7seLbacks Front. -F '|-r/!:
sides 15' /5'/ l1 'Rear 15' L rat
siue coverase l/31 il 5;:81 $' #lb'!,"^.ldrlq,'Landscapins > /4gZ dL
ReLainins warl lteishLs 3'@ 6!'
Parkins lneqra / tlencl
' '-411 '33o+ zqa ' trLu (600 t <sooy'@ uz= 4 o.e,z. ,23 frcarase crcdiL h.i[ lrra,zca ;2, (ac+i1
Drive: Perrnilt'ea slope lO * Proposed slope /O %
Complies with T.O.v. Liqhting Ordinance Yes No
4 ) wet.Lands arc
view Corridor Encroachment: Yes- No-r---4(--
Does Lhis reqriesL invoive a Z5O ridtiiLiort? \JEs ,At L
IIow much of the allowed 250 Addit,ion is usedlwiLh this requesL?ilJLJL-
Previous condiLions of approval (check properLy file):
1q4 il > 4,p,nr*J
I
Prirnary/ secondary
PI-IONE
PIToNE <74 - z/53'
V'l A
1C.1O
Lor srzE 'b,6s.3 P BUTLDABLE Lor AREA
wat.er Course SeLback (30) (s0)(1t-
Do Finistr Grades Exceed 2:1 (50%)YES
1) Flood Plain
o
Environmen La1,/ltazards :
No__.d4___
oL_
3o%t 2101b
he oL
b) nockf all e Hi4-.. ,c) Debris FlowG
2l PercenL Sl.ope (< >
3) Geologic }lazards
a) Sno$t Avalanc
71qg+ /winct<l.t129)
l_0
oesi!il Review Action rorrO
TOWN OF VAIL
Category Number /Z ox" tO/6/9s
Project Name:
Building Name:
Project Description:
Owner, Address and Phone:
Legal Description: uot /O Bbck / Subdivision 'Vt, r+ ?^ t-/, zoneDistrict P/S
Project Street Aaaregs: -799 //'7a rf*tZ', ?ttrz h
Comments:
--
Board€tffiiiG\
Motion by: Vote:
Seconded by:
'"/
{st"rnnotou"r
I t- /.Vr. a)- ... /\'-<_1-..., .
U
Town Planner
o*", /C/6/95 DRB Fee Pre-paid 411.ou
IltfA{ t{oTE- searr..r-"o
at ty Vlrfx
. Dlllcr rrwttr tgtrD r4,!tc[,ltgr .. lFoE os Tar!. Es!,cLEO
DAtl ttct!9!D:Pf,IE Ol Dnl l|tt,lltft rartt.lallla
Tt?l oF BE\rrErr!
--:!?1. cgDrtnre?ion (froo.oo' 4ti*= Als.r tan (rfo.Oo,, ^ddttinD |f 50.00) _--co!€eDBger ncvten ilo)
.P' 2- ----'r-'
r
cr,
tl.
ADgtltl I
I trl9 DIfcnrDT[{n{,: tf,| /4, , alf,cy. /lubdivislsn l-},.hx-* t'*A- -It DtoD€Tty ir. dcecrlbed.. by a rrahr rnd bortnd! lrgrldoecrigelon, _pl:art prawlci @ a1urare rtrrrt and aeraehto Ehll rplrlid.t lon.
l. l6lttGr
r', xl||I ot
c..
n.'&F,ne
J(JJ#LIJJ-
lflllc Ol Ot|ltrtlt, r,
fttilCr!!|oill
',t4lt
P7 t! ,locltllD
':erEultlr
ffiu.' s trmlat
Coddodniiirn lg,lrronrl if atPlt4.bra,
nott uEE I nED aarr. at rlal lhrn. tu rA fa lJil tt tiallta ct auhlctrr ot t!. DnE rtlrtlcrlton. rEE:r, wtrenrp?lyllt ror' e Dulraht pcnlc, plru. Id:nelfy tJre tcssngevaluaBldr ot Ehc tt"oPo!.I. thr lsrB o! rtel I nl1l ldjnrb rhe4.. rccordlrr{f Eo Glrc hbtrr brlw. to earuso Ehs coraacC fetls Drld.
HA|C Ot Att&rc,t*f 'LttIelllha ldirA.r! tJ A,NllC Ot lttllC,l*f 'LllllSl$fllt$lfE: ()r.lrlAs rCCre.f : _JLAJ14a4__ _
t!!..18.|Ifl.41 vrf,utt'luI o-f 10,000I lc,co1 a 59,3C3I 50,001 . f' lto.ogo
1150,00r | 100,000
1300.00t - ft,000,000I lturr 11. O00.000
b ,n*77a&.^-t
tlt| 10.00
f100.00lt00. 00
a{00.00
1100.00
aael?aoitl
Xl|{T OI llt'JICf,ET:Hrlllug Adiltcrrr
SJI'J.MElltllttrg Addfcft r
'
D"-.. %"
Pt *- -,\a^)tqiJ eil- R2r*l6t
eQ"-A- -h fl\L *[',.7o;t_.n+0.r-
Q; &^ {-,'+ $*A -P M"@,-04
0"-.^0,s. @ A,0** o^ WW
;
",rJ,n-,
+. -Qo^oto* *rrzrDrr- *^ [h
hro-h^. J. _$*C _a&[I &, a& h
,d""- J A ,s C. k,ll
Sr-^"rA-,J
.Wo@{lh4,s/ffi^ ( 'l
U{L"1 42 t o14l
rJot+v 476*erta
Fitr- Fame C,stO{' g'k-
-bnrr.
o
!t
!co
=. o-ctrBg
3:99-o€r-[.f
c'Ee
:.5j+t(:
o
N.^Dv/oargs_
tpd
<. Lo
(^€
d'<
+
8tE
t'Pe
,$&6 '.":H
-El'fsfr ,3 *o,
o-f.{$J F$
\*q*
$E0 i
Sd -, b
$F$,'$.fif-;fuq ,1#
. trll *L,
^..lori-d Gesal zL t-
aq1 pororo ?*rcx p.
Unir- Cnt^a w6g7*0 4-26 *r!6x7
Qr 11! & Epxoy Grout
f"E"o*r31r#*"''
Typ lcol { ploces
Ss n PnouzD
,r\nv ? {qq5
Drrll & Epxoy Grout2 HS x 2t" DowelsTop & Botlom
Typ rcol { ploces The Controctor must hove the buildirlocotion certifi.ed by o registereJ-iurto Insure thot no setbock encroochnvcrify with setbock
Foundction Plcn
I'
Se'r- 47, rq95 O-o*rl GesatAtU
?'$l i E?r%f59"'Top & Bottom
Typ rcol { pioces
Dr rl I & Eoxoy Grout2 fS x 2t" OowelsTop & Bottom
Typrcol I ploces
aq4 PoToro ?*o* P.
U'qi{- Csro w[g7
970 \-tG *(69
Ss A PRodzD
I/tnv ? Fqs
@
Rrqt,ef,.r' Fon-
4"
+c{
SerXo*l fr
Secrrol B
N0 cv1N6L
7t b"
vorify with setbock
4" Cio. perforoted pVC
droin in 1' x 1' qrovel ond
fiite r fobric to C6ylight
r\
*)
.The .Controctor must hove the buildinrlocouon certified by o registered surviro Insure thot. no setbock encroochmeOCCUF'.' | '
Foundction Plcr-r
---', &Y fo &po {sscoaa- rg4aJm&' e-
oato -426 t!8{-
--fut*fo*,t Et u,w- 14*g- fir--ac F/ru/*--
&/ f,(ika* FotL&t4 as-€rrkras h&.--
&r.a,e - |He-ata6 au,ge4/'e,a*t-cpe*L,. flp-*-at* -
fu-f-re r@-*.p /np-4't 4ast s. Qut .€zsztw
" JUttM./fX.e.---ruA ..6,.et8 61aa. r/S f|'*y--ff-Ar.
. :- -t<fta*C- -Q.LT,o o r--das- .fui flt tr " furmgJr-
- ' Iauraz'Eo K*oI {tam--"fa* ." Fa:our,fzeA,e. ua - -
, --JMa s'fatdZ-lttttt M:EE/g- Ta Mt'---..
-Ua-!4e a&r@-ta*-Ett ,fr ?-uaup /tt.-- -
: ----Q&rtua ro-.FtEEw p4lka !e''a'P.-r- t-otts
_/_EEE_.
{g*t*
* _fue *t ..1,w ,Aas^ac-t *Ceou.la
r.4z
filta> B / G-Onv^tAp 4a&rrtu.fi "fik-
t(.ao o * - En ona A y-.4*,6,*ss fu,,Mzt
?- -kgr- trrat* p de:. -t'tl& - 9+f dtta r&ou
/5 fr t, Otn 3fr, d y+#t ltUe 4*fisflEEaiaA-
,L_O-t/&n _fur'*..- tlFfuqe._
.={tfueo 3rr,4 gZ*.* t*P-*u"---
&n* flg*r*n ot, ftF dr-V*.rtfu#--
ltg *9.rcr--fusrvss
faot+. Jttd.uz.
Q44e74p 4,. t*pfpartn Fer*
. T!1, &tor,o 9*rex p,' Vflrl C
,rno!l$,sytz
Ss AhodED
trtnv
"req€.r\HEqrEf' .frq
iife*l-ff*"rrff*
Sfir\AF,
12,o"
Typrccl i pld.""
ifft_tffip,esff
Trp,coi t pioeeg
Secrro^l rS
Seerrov J3
Na ca#tt
r-r oun
vot{fy with setbock
cJcticn PIo n
^4.
I
TBTFL P.A3
o
L
s
\trs-o\t
rfl
{
.--$
fL
5
b
$
F
td
.(
\\)
.-s
*}
$
r{F.
9
Nt"
s
-3
g
a\3r
\ s$t
r. l g{-'5
:.--- ? 5 +*
f; .f f s-*-R8l:'3Se 4*^l urr--$ I ;TYs*i$6
r ln -'
$"x ! Ysill?t€j,;*{ s'
$;{}itii{
3$'+
6-ggn
9o':t
=:oaooroo{!oo
lttn
f o i6- oor-o O
oo lrda -+'!ao | €Ls? S -r,alt a9t :o:\R;x: 5 Io -5 't)8*irh
o
q
(o,
I
tO
t.
l
Vt{?5:tlt
-lT
$l
t\t
(tt
(ct(ct
CJt
v 1'5"
/iy
l;-
slnF tu
F I,;
dst{;EsO-
ttr
$
)
r,
$
t}F
F
vl
I F
F
,t>
v,
rs
(d
11Bo-+fz.4 o-.$d4- 6
fr
Ii.
).t
$'FsqLsls\/^O
TS
\3
$8
n
n
o
UIo
ono
oWCp
+
I
o
$iF
.,.' F *,,
(D rN \(DoFlE its. l,i' rh6 R Hz sts etd I F l{= ' F_ cie.-a
l.)X
.tr
A
6-
5-,F5+
to:FlJo
_.o
et
6-o.O('
3'g:'
a)
"o 'l
75 South Frontage Road
Vail" Colorado 61657
303-479-21 38 / 479-2 I 39
FAX 303:479-2452
July 22, 1994
Deparnnent of Conwtuniry Development
n r,"d-bltq-
a\h,l*rldr+\sv-
-.rnxft ln' )tF.-tr' +rf:fffr,#-(d{al
L I lt''l lr.1I IMary and John Clark
173 Balmoral Avenue
Toronto, Ontario M4V1J8, Canada
RE: 794-A and 794-8 Potalo Patch Drive, Lot 10, Block 1, Vail Potato Patch Subdivision
Dear Mary and John:
Thank you for your letter concerning lhe construction on the Cogswell residence at 794-A
Potato Patch Drive. Our department will be contacting Mr. and Mrs. Cogswell to try to get the
foundation removed lrom the property where the staircase was originally constructed. In
addition, I have placed your letler inside the permanent file folder for this property. Your letter
has also been copied to all ol the planners at the Community Development Department so
that lhey will be aware of your concern. I am leaVing my position as the Community
Development Direclor on July 26, 1994. Mr. Mike Mollica will be serving as the Acting
Communily Development Director until such time as the position is filled. lf you need any
further questions answered by our department, please feel free tb call Mike Mollica.
Sincerely,
Community Development Director
xc: Planners
a) i994
MARY AND JOHN CI,ARK
173 Balmoral Avenue
Toronto, Ontario
M4V lJ8, Canada
(416) 920-926r
FN(: (416) 92O-945r
Tuesday, July 12th, 1994
Town of Vail
Communit5r Development Department
75 South Frontage Road
Vail, Colorado
8r657. U.S.A.
Attentlon: Ms. Klrstan Pritz, Dtrector
Reference: 794A, and 794E} Potato Patch Drtve
Dear Madame:
We own a resldence at 794F} Potato Patch Drlve whlch is a duplex with
the front property 794A owned by John and Patrice Cogswell. They are
permanent Vail residents, whereas, u'e are residents tn the wlnter only. We
have had discusslons with the Cogswell's about lmprovtng our propertles but
to date have been unable to reach agreement on who is going to do what. We
are concemed slnce we are not ln Vail for extended perlods and that a
permit could be issued for constmctlon at 794L wlthout our knowledge or
consent. We request, therefore, that we be advtsed of any appltcatlon for
constructlon that is made to the Town of Vatl by John and Patrice Cogswell
for 794A Potato Patch Drive, a duplex property.
In March of 1994 I met wtth Andy Knudsen a Senior Planner in your
department who suggested I wrlte this letter and advised that a copy of our
letter would be put in the approprtate flle. He stated that the Town of Vatl
did not enforce covenants or party wall agreements, but does enforce local
by-laws in our case that would lnclude allowable square footage and parcel
boundary lines. We are concerned about these because the prelimtnary
drawlngs shown to us by the owners of 794A tndlcated thelr deslre to
exceed existing parcel boundaries.
We had an incldent in December l99t when we arrlved at our Vall
residence, we found that an outside statrcase had been erected at 794F^
without our knowledge or consent. We contacted your department and were
advised that a construction permit had not been issued and a stop order was
posted. Subsequenfly the staircase was taken down but but the foundation
and stalrcase are sill remaining on the property, as well as the open area on
the patio where the staircase was fastened--an eyesore to say the least.
Yours very truly,q{e/'
John H. Clark
cc Larr5r Gustafson
We hope you will appreciate our posltion and will advise us by phone,
FAX or by letter promptly if any applicatlon ts made to the deslgn review
board for a construction permit to 794A Potato Patch Drive (Parcel fOA.
Your co-operation in this matter would be very much appreciated and
if you requlre any further informaflon, or if you cannot comply with our
request, please advise.
Baum & Gustafsonl32l Bannock Street
Denver, Colorado
80204, U.S.A.
cc Richard Hampelman, Architect
ITOI Wynkoop Street
Suite 3O4, Union Station
Denver, Colorado
80202, U.S.A
2
oz
F
=eu,(l-
€
(r')(n
UJ
tJ,Jtl-
F
=t
UJ(L
ryt
/b/Lla/ asrll r*"U
Ol
e\|
o
v
4
an
z
td< irloztrzbs(5Frz6o!z
!!
UJF
o
Eo
EFIz
o
2z
llJF
z
z
=
.o
ozzo
uJz3
LIJ
LZ.n<
3=\s-c\
*$q5+
tr-
tra
=-L
IL
o
o
Fz
El+
o
o
c(!
o
o
E
l;
(!
;
o
oti (!.Y,
-=O@;(*tsoiESEa
F g RT.;Eg8
-.= (! -clc:
9 UP.Oc-o>
cSsE
=EE;-.= n;>==c96E
35t=
-' *:6-;: CLNiSE,*OOci=:x'E c;i
Eiaco- (! 0-*sE; s
oiE-ors*e€
;F€HAfFqJ-: :;
(60--
=zlo(,
e.9 :':it'Ei=o i 3!
E FaE
*E F";g; E9Eo -
P 5 gi
lrl
co
rnrn o.il
c{
&
F
uJ
z
=l
Y
I
z
FF
[J
z6
=-
2
=
UJ
UJ
lJ-z
t-
uJ
UJ
oE
lo
B
UJtlll
2
6t!o
F
UJ
o-
z
llJ
o
X
uto
U'
UJt!tr-
F
=
tJJ
J
FoF
z
J3ql
.J
9
ut
tu
oz6
=lJo-
2
I
llJ
=
NorrvE vA
H
F{
H
El
3
Fl
t
EE
TA
t4!4
.A
EFI
:<E
=ozq
F
-.
IIJo
LIJz
--("
=co6r
zz
io- 7XrF9 0
tDOz>-
QZrL <(oer,u fo-v
FO
<GJ
=>G
I
lv)t5loIHt>
IH
l*t(ll
l<
I r-r
IE
l-
Irqtvt<
t?lf:l
Y.
tz
z
tr
:f)
l!(r
f
F
oo
ct)
G
ca
j
z
Eoo
z
tr
LU
B
z
=zlzOo
F IIJ<(Jo<
2E
do<z
Lzrf,94
d636OI
X X X X
Fl
O
F
2
F
@
z
(l
uJo
Jl
-l
zl
z
ul
u,.l
ll,.lza
=
E
uJ(L)
zo
Eoo
Fu-<oE
UJz
I
IF
F
z
F
J
loz
Lr
tt
3
F
.f,>
\T
btJ
o
&
c\i
t-
OO
p
\
{
$
ahz.{
o2
ujF
o
d)
-)
2
F
ulY
uJ
Co
oF-r
F oi
=3cc
LrJo-F{
!!HL, C)>oIL >-o6
,alH
H,*lbkzo
c)Ht(
zo,.\ F{oY <;5I
=< ".-"1 =.+dE Rnntr
,^*-5
=Eidd=
tr
=
tlJ
o-
IJJ
z
oo
cc
Jl-UJ-h=
o. LlJ
=rl-Ou-9o
- llJxo-:>LJ I-l!
J
uJIooF
o
o
o
o'
E
o(,
o
E
=Elrl
o-zo
F
C)
E,Fozoo
lrlllltl4l
t(JltF{lt<ltAlYIJOId)Hlr<l
t5tlOr I
2ull{t<l>l(5tzF-9;
ts
5&J
&
v2
fr
ra4{
r-..i
z
x
'l
-lzl
:'I
u.l
>l<l4
trl
Fl
EFl
cn
F\
UJ
o
:
=
z
+6<-Hz
Hz
H
E()=(r
tr
u)
o
-
ts
o.zH
aH
oo&
ia
g.
tr
z
o
uJ
=
lr-oz3o
F
rnrn
I
z
o
UJ
J
(!oz3I =e
oz
o
IJJ
cc
o
z3I Eo3
L:1
ol
o
ql
<l>l
ltl
>l
3lolFI
=tr
z
uJG
J
q-oz3oF
llJJ
UJF
E
u.Jz
=o
F
uJ
=r
--r O<F
L!<zEt!F(rzo
<oOF
-<
;F
=zf
2?
=f)ztLo
<=
YFz<)z<
Y,Z
=x
Eir
=
u2
(J
<O<,?UJ LT'
JO
FIT
\
\
\o
6t
':)
a{>
aLaH
, .rl
,sli cql';l
lurF)<:o
z
EEroO
==s
O- l!
fltrn
=l*
gl=gE
unn
=frGt!oEEz1BAEri€!tF.
?:iEH:rHE:EU
EAi3si
HoF
ts
=Eltl
o-z9
bf,E
6zoo
oz
c-Gt!o.
I lr
i;IErili
r! I E
1lt\'l
Eo
6
,o
eEE9'
€gE EE
€ gE,E $
l!Jul(t,
=E
Go
!lEEg
ffii
H6
PH<F
oJJ
'Fx
ut H'E
zl
.. >lo
UJoulu,zot:
ulc
zo
F
6o
=ur=.o
zst-. o.
CEoOz>C'()az|!<oqu,l 'lEg
''i .\,i
1ilI
l-l g'l
lE ;i
t'q
il
,fi[lAl
tsllr(ul[, .rJ I
Isl
P$l
l3
F
'.ol!l:'lc)lNlo1 I\Elr.,oo'
drd
o
tr
U
Fo
iA
Eo ntd
g
H
Eel!
G
uJz3o
Fo
uJ
E
()
E
E
-rO<Fcc)uJ<ZFu-r Fi^Z-o()
JE<oOF
E?()E
i6
EooZF
E?ZG]Fd6()
d'9
73
g6
FE?*E FOzo(J
x,r<)<)<:()<
-)/l a'-
PERMIT NUMBER OF PROJECT
DATE
READY FOR
LOCATION:
INSPECTION:
INSPECTION REQUEST
VAIL
JOB NAME I (.{ ( /
CAPLEF
TUES
$4eenoveo
CORRECTIONS:
O DISAPPROVED E REINSPECTION REQUIRED
BUILD!NG:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH i WATER
tr FOUNDATION / STEEL
tr FRAMING
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
E POOL / H. TUB
SHEETROCK NAIL
tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
D HEATING
tr EXHAUST HOODS
CONDUIT .D SUPPLY AIR
tr FINAL
/rr r--r n IDATE /U-I I-Y1 INSPECTOR
oz
E
=Eluo-
cc
c
r.
o
r-a
(n
IJJ
uJu-
F
=E
IIJ
r$$01 @Fl colo!
lFlltt"l *'
tuJ NAF
EE<FrZtb
t.
(
/1
2HZg_g
qS Fl
EJ() >qEA.
aEr
q=H
uJF
F
FIz
=
zz
ulF
z
oz
6
.6
zza
IL
Jt!
U)
; .\lii-E\l Xg .tE
o. l<o. ltr:J?i\3P\ \lb9[c
Er l=
gr I'. lor[\ rH;-:\ \IH oE N\-t=,,,B\ 1!I6 )gzE l(/)<
E19t,x/,d /tn(a '4J a'
E4q
i / tr",
= /1.
E,/,, J )
d/ 'F(l)lg8l
sRl! -l
-51
'6
o
si!)tto
'6
.=o
o
(E
'-
oNE\
O -c\()'oo:Fqo)
ov
*O
-.9(g6
trO.t(J.=d
9o
gE
o(/r
cE'is
>'5o.ct
o?o!oc€oo-oo:'E'S
xqtp(/)
oco(!
oaD
od
=(E
H€
o.6cslq).vt'F5=o(E
o--c
F't
o(!
EoE
o
o-
E(!
E
o
;
(5
OJ
(g
o
(6
i
.G
a
q,
T
()oo
C
o
-g
Eo
oo
.9
o.=
o,
o(!
EoE
o
o
E(!
E
(Dt:
E8
c.2
.EY
FrXo
cr-'-oo(!
-E =r:.E
=vE>cP'-o
d6E
otr
eo
'F2Fi.=-
o$
dG-- -c'FoEG
;(1
/rr(t
(gc
! -::
-c(gc
.rO
(Jrd!:o.)r-
'dOC
J;
(Et>!
-oll
(l)Er.c
-c
rOg o
F-{
o
r.{
oo
tn
ca
rntlt
=
=t
UJ
z
=
-
UJI
z
d
J
trF
uJ
uJ
z
=
d
z
TIJ
UJ
uJt!z9F
uJ
gJ
E
o
ofo
=uJt
UJ
e.z
6
uJ
F6
IJJo
z
uJ UJo
alu
uJt!
ts
=u,I
J
oF
z ()
tFogJ)
uJ
z
=J
J
=T
|rl
=
H
E{oH
NO|lVn'lVA
;E
=Z tJ-
6zto
E
uJo
J
|'|Jz
llJ
N
N
=>c
= ..,
z
tr^
tnO1>q, (Jozr!<oqu-
>o
-..\i
{f
Iil,4F:qe
IH:{HfI(f,orlvao4Alrqf'4(,AZ3Hr{Xf,U
:rl ,<
lf-d'{a
<l F!t E
M{
t4}]
a
H
u)o
'-lo
z
tr
lJ
{
(E
ri
o-
UJ
ftA
oo
F-
RXE
uJ
:
z
troo
z
tr
LUF.)
=LIJz
tltltlll
tzf,z
KOoq
=FPtr6o<z
il
Fz ,.
2z
fio3trOI
l
a
(!
aa
uJz
iF
z
tr
5az cr
2
B
F
!J
_]'t
2
t-l
i
ii
EIzl
zl
.. >lo
LIJo
LIJ
llJz
aF
UJ(L
z
E
oH-k>og
c7t
&,
I
2
/,
)
2
ulFodl
azo
t-(Ll!Y
UJ
c0
oF
F
=@ilqo- r-1bJ
(LtOAo4rElrl
H Lrrbkzo
()
Hd
lJl
=E.n9 fi
=E
H>z"-?= siY or
-- t-'nr!
-J."iE
=Eidd=
t
IJJc
ll-
ut
z
o
U)
F
E
tr
JFb=J-(LLU>(LO|!9oqurx(!-:>ilF
=tr
lrl(o
tro
E
-90t
!'E
c
E
Eoct
o
G
-G
F
=E,
UJ
o-z9Fof
E,Fazoo
6
F
t)
+,(t
A
o
+Jd
+)o
Al
F{.Fl
d
oz
=tr
I
l
6
I
I
IF
)
a
Hd
t4x
l{
FlrlBE
C)
ii
=z
6
_-1
_l
(t
B
vt
o1q
o
or)
tll
=z
o
ra
X
UJ
oo
=t
c{
Or\o
I
-(L
.-{._l
6
E t
|.l.l
o
I
F
Fl
Fl
trlB(/)
oU
z
F)
=td
^l
Trl
o
2.
ol
uJ
1
a
LLoz3I
o\c\
.-l(o
I\0
t{
o\\o
c'-
r-{
Ilc)
F-g
ttIF
=c
oz
o
uJ
J
tl-oz3 =(I
d
z
cj
IJJ
=
ttoz3
F tr
oz
out
J
(!
oz3o
F
zoHHOp
E.r
U)z
U
o
I(J
|r.l
E
Etr
uJz3
F
UJ
I
O
E
--l o*f5
ErrJ <gzE>rrr Fl)tq Zo
Je<oOF
;=!iF-, z.
r--lJ \J
'O
EC'c)zt;o=<z.E
-JZLLo
x6:IF
=2YZ
=g
(E ir
b2<(Jfi3=o
ffill
^clrt O." llJ C'F J .r-
H CO {-t
=<(6d(-) clrl F. aO4Je
(5 c!- x
=<q.J lr- (.'|
Fa a-r Olr!- cld .'Elo c.olLr- (4 l-lt, 'E Io.tr IB o.3l
l,.tJ E (uItrJ CFIzoo-l- '51; F:I;2 lF o-l
Etsl_.t .P (IJlJ +' C4lQ 0., I,J_ J c{l
H,.l
l$
$
ol
blsl
^.1
x x
tl
'N
U
$
x x
o
UJ
uJu-
==oa
u.t(L
rtI5lzlolzl6lJI5lcol!. Iolzlzt\oL
IIur
IEro
I
I
I
IH
lo
I
I
N
lttIJtur
| <ttt>
lol*E
Fo
zoo
CE
UJz
3
rt: got:(5'5Eo
sbEEo6
c,2ul.9o 369cc.= (5
:-fc
EEX
o(ucc- B
=g€! '>- =ci'-
EsE_5:\
3 Ea
cc-
€'c 9r(E+- -'i= at.ooor
I
0
0
q
I
I
I
t
G
']
I
?\
,,.V
.\)
l-i
<i
sl
)
rE\
VJ
NA
tv)
+
==e.qJ
z
c)
:)
ID
Yo
l/J
(J
z
Jo-
9e.
Fo
UJ
llJ
z
dl
=J
Iz
ottl
ru
UJ
z9
ul
uj
=uJ
rlJEz
6
r|Jo
o-u,
z
t!
x
F
ulo
al,
UJ
l!u-
Fr-tQr
1t<lFIolFI
z ocF()
UJ
ur
oz
.o
=
9z
C)ut
=
J
FoF(\
NO[Vn'lvA
ttl_l
6l
!l
rl
lrJF
o
H
F
It
It
#,EOE3lltoI<z$lo \--l
EHci
fi\1oada
s04
sJ
^=Q9 r,= -'\3ur.S
=to<\l
zzooho- I<fEgo9oa>9(.jl9Z
Hgg8
Fc)j.i
z
F-
lJ
tt\
\\N
llsllc<
O-
lluJ
ll-
t^t-
t<rlz
IPld
lot^l>z
frl
$i
:IuJlzl
ci
u.lo
UJ
UJzo
E
ulo-
zo
E
ll'tl IItltl
at,Fzfz9oF TIJ<oo<
> iir>E8qoo<z
tltl
tl
oI4;
2=-iFd6IE :
ll,,
z
G
oz
It t
E
l6
l:lo-
F
2o
F
j
v)zl
rfisil *
E€i gg
ifEgi-+xE=F:-*E 3d
lESg;s
I ggg:i
I i saEa
I if 5;*
!Fg; s
N.
\
t\
(x-
.U
N
ort
ul (/lE-oaAz.q=
;=od
FU-oL! r!
ul-dl
o_F
F
=
-.FR,o+l
o- --lo c6lotll:l
HFJ2=
a
tg
_t H
h55,1oll
ln
9rt2q ;l
J]
-)r$
E
s
()
I.. I
HIzl
3l->- I
Itlll*ItgI lrltdtcrlol
d3=l
lll*
lJ li
rH
fi1*t
E 313r-l al=l
del eil
llIItol| =.1tflt lItrl Ilil I
lg-lf; Pl
'-'l
[lllllr|et Irlg
I
lf, I
d3'il
I
zl
ol
IJJI
ccl
a-l>l
6l
zl
3lolH
[dl
l5l J$
Lq fl"fl
sfl
IJ.l<(Jl(t (/, IIU UJIJol
UJz
=o
F
C)
uJ
=T()
G
-.r O<t-oao
u., <zq,U,FgZoo
5P
Erul=t
E!20a,F
=<--:z
<^YFz<)3f
9,>
=g
ar i,
=b2
x.xx x,X
!l
ooo
gl:fifi
qDn
uJ=e.2<E
- o.tx5
Esutr^ <
€'5 A: tr o:=F'FG.i- g
=.fi=tE=
"8=3raiEidE=l
E.u Q€q=
-uJr3TF**
--E
tz
,rl9
=tEolo
=lz=lfd/P
ts
=Elrlo-zo
F
C)DEFazo()
><><X
NAME OF
ADDRESS:
PHONE #:
COMPTINY:
Must be received and**Submit to the Town
PLEASE SUEMIT
Type of registration
Application made by:
prior to issuance of registration.Building Department.
app ro vedof Vai'l
COPY OF
bein
AI{Y PERT
lied for
INENT REGISTRATION I,IITH APPLICATION.. r'\, l), L)MFrt - Buuorrl %uoy
//e7/66d-
DATE OF BIRTH
REGISTRATION FEES
Regular Cost Renewal CostGeneral Contractor A or Construction Manaqernent !'ieJY re'| vvJL '\'Ir"swq' L
^^-^.-_1 ^^-!.-_ -r, (Valuation over g1,000;000) ..$175.00 $125.00General Contractor B or Construction Manaqement(Valuation under gt,00O,OOO; 100.00 75.00P-1umbing.:..... 75.00 55.00Mechanical... 75.00 SS.ooEl ect ri ca l5i;;i;i-ii;;i;;;;';;il;ii;';i;;;,';;;;;;;:';;;;;;;;;';i;;;i;" 75'00 s5.00
etc.... 75.00 55.00
55.000wner/Builder.. @aD
:'!
IT IS IMPERATIVE THAI--AL!-IQNI8AIIORS HAVE THE FSLLOW]NG INSURANCE CERTIFICATES;
/,-'
NOTE:
IABILITY - Option #1: $1,000,000 in the aggregate for Bodily Injury
$1,000,000 in the aigre6ate for propei^ty Damige
0ption #2: Combined single limit of g1,000,000.00
[10RKMEN'S COMPENSATI0N - show.that you are covered in the state of colorado*No workmen's comp. - provide a ietter stating vou iie the sole own;;-&-will not hold the town iiible for any accidents. Atthe tire you hire someone you wilI provide us with l.lQ.
If v9g are purchasing an electrical or plumbing registration, you mustprovide a copy of a Master Registration from tie siate or cofoi.aaoi=
Thank you,
Janei I Turnbul l
TOV Building Dept.
to
loya+
A Partnersh'ip
An Individual
Principal orrice: .V+.iC.
EXPERIENCE OUESTI0NNAIRE (AIA Document Number 4-305 79 Edition may belffiln-Tid of)--
l. .How many years has your organization been in business as acontractorunderyourpresentbusinessname?.
2. How many years experience in the proposed type and size ofconstruction work has your organization had? ..'....... .:..:.. .
recent projects your organization has had insimilar in type and sizi:
Type and
Class of work
3. List the most
construction work
When
Compl eted Name and Address of 0wner
4. List mun'icipalities you have licenses and current status:
,:/r.UA.
J'
5. i.tt.t oth". important projects
compl eted?
Type and
Class of work
of similar magnitude has your organization
ljhen
Compl eted Name & Address of Ovrner
korc . -Abs/E-
compl ete any work alarded to you?
why?
to
and
failed
, where
6. Have you ever
...d4.....rr so
7. Name the Surety Company, bonding capacity,
and the name and address of the local agency you expect to use:
fir-us. . fu il . .I rt sltl,a.N.cz--
8. What is the construction and experience of the
principal individua'l s of your organization and those individuals
to be directly involved in any project in the Town of Vail.
Individual's
Nanre
' Present
Pos i ti on
or 0ffice
Yrs. of Con-
s tructi on
Experi ence
Magni tude
& Type of
l.lork
In l'lhat
Capaci ty?
-bt+n e Cocs*e ut-Pr<es tO Ntuqu€-. . A+:,aq r.q.. . . .
9. Do you hold any valid licenses, i.e. Master Plumber, Architect, Electrica'l ?
NP
.t
t
f..
10. List the major
or corporation own
items of equipmnt
or will be used in
which your_or your company,the Town of Vail: ...
11. List below the Contracts which.Jou, ol our company, orcorporation were party-to, during thi frevious d; liiij'ylr"r,that were involvei in litr'gation-of in! uype:
13.__I!: tlllowing is for all contracts which you,-or your company,or corporation were party to-during the previoiri-iir. iii'v.u.r.
A) Percentage of proJects completed witjrin schedule.' ln'r'.....:yvl....r
13- How much of the work wiil you do directry compared to sub-contractors?
14. Bankins Reierences fOf S O
A.'t
B.
15. Trade References
A.
B.
c.
D.
E.
16.. Have you ever had a license in our area or any other areaunder any name that was:
A) Revoked
B) Denied
C) Suspended
If so, p'l ease explain:
l7).If registrant is-Corporation or partnership, please stateappl icant rel ationship/pbsition :
18) t,Ihat is your postion in this registration?
A) officer
B) Stockhotder
C) Principal
D) Other
19) Social Security #:
INSPECTIONTOWN OF
REOUEST
VAILBER OF PROJECT
:. t, \
INSPECTION:
JOB NAME
MON
CALLER
TUES WED THUR PMFRIREA
LOCA
PLUMBING:
tr UNDERGROUND
tr ROUGH / D,W.V.
tr ROUGH / WATER
BUlLDlt0G
tr FOOTII{GS / STEEL
tr FOUtilpATrON / STEEL
E FRAhIING
lr RooE & SHEER- PLYWgOD NATLTNG
o rNsuLATtoN
-
tr GAS PIPING
tr POOL / H. TUB
tr SHEETROCK NAIL
-
tr
trtr
MECHANICAL:
WEB
-
tr HEATING
o ROU€H:-;tr coNQu.T
r'l
tr EXHAUST HOODS
tr SUPPLY AIR
,r tr F|NAL
'bAPPBoyED
CORREdNONS:
tr DISAPPROVED D REINSPECTION REQUIRED
DATE INSPECTOR
-l l.-:f'Jj
PERMIT NUMBEB OF PROJECT
LDATE & i !,,' 7--',- JOB NAME
INSPECTIONTOWN OF
REQUEST
VAIL
READY FOR
LOCATION:
INSPECTION:
i --, l.
MON TUES WED THUR
'i
FRI i' j '"'"i ag
CALLER
BUILDING:
tr FOOTINGS / STEEL
PL
tr
tr
tr
tr
o
tr
UMBING:
tr FOUNDATION / STEEL
UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATER.i} FRAMING ]I',
- ROOF & SHEER
" PLYwooD NA|LING GAS PIPING
tr INSULATION POOL / H. TUB
b sHeernocK NAIL ', i'
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr
tr
tr
ROUGH tr
tr
n
EXHAUST HOODS
CONDUIT SUPPLY AIR
tr 4rNAL tr FINAL
PPROVED
,I
i CORRECTIONS:
tr DISAPPROVED tr BEINSPECTION REQUIRED
I
DATE INSPECTOR
o
SPEIN CTION REQUEST
TOWN OF VAILPERMIT NUMBER OF PROJECT
READY FOB
LOCATION:
INSPECTION:
JOB NAME
MON
CALLER
TUES
il
WED THUR FRI PM
.!
DATE :i ,'
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATERtr
o
tr
tr
o
FRAMING
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION
SHEETROCK
tr POOL / H. TUB
NAIL tr
{'rrNnl .tr FINALI
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
tr,f tNAL tr FINAL
PROVED tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
DATE INSPECTOR
:]Zcf
PERMIT NUMBER OF PROJECT
oo* u 1'(:t'
lNs
,7c) '' :-o- €.. I
o
PECTION
TOWN OF
I
REQUEST
VAIL
JOB NAME
f\.--.,-
CALLER
READY FOR INSPECTION:MON TUES (qE.g) THUR FRI ,j:-,!/, - 6il pM
LOCATION:
BUILDING:
r] FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
n ROOF & SHEER" PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL o
tr {n
tr FINAL tr FINAL
ELEGTRIGAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
FINAL tr FINAL
X"r^ouro
CORBECTIONS:
tr DISAPPROVED D REINSPECTION REQUIRED
DATE INSPECTOR
oz
F
=c4l
ooo
o
rJ)
coc
r.o
oOO
@(\l
ooo
FI
u)
uJulIL
F
=E
LU
I
N"
\*
I
I
id
Ns
s
Lr"
o
F
,-I
==o
z
t!
z
z
t
t
nl
tl
:
S
F!.
n
L
-Tlv,IA
$
:N
<Fa.
-<?
FUI
l:.zi2
;:<
oa
c4rc
oO
(o
F{
@
oO
!-lorr{
O
o
(\l
c c<\(!
Ic
(\sf
\
;
u:
4
=:EE
c
z
6
xolrl
z
Jt!
E.
F
LtlJtu
z
lJo-
2
I(J
uJ
=
uJILz
tr
E
(r
3qJ
UJ
z
uJ
F
uJo
z
a
uJ
uJl!
F
=E
r.u
J
F
<a -q:t(Jz
oIldl
9E
C)tu
uj
z6
=l
a-
J
2
UJ
=
NOtrvntvA
=> }.-.E \>--.-<
=(DN
:<(r
=zzu-
:? Y -.,F ^ a zii
X tr Z Y'-g P O E=a o t-7 x 3=6 > H9l!<3i 3+9E sFo6*(\to
z
F
l
o
o-f
uJ(L
F
ccc
(\
|l.:
Ooo
(\l
rJ)
E
o-
uJ
zo
=oo
zo
tr
Elu
J
x
3
UJz
||tlJrllllZ z- zE E; rc: e Eqe
EBfrE:9<(Daroz=lol I | | |
tFt | | | |
a9zx.6a=3 i rHF2 3 =deir=gEgo(,o-z<)
z
F
.Jlaz
uJl
?E
Ol Ol @(Y'
F
IJJ
_t-
x
a
o
UJ)
LIJ
oo
3
E
LU
uJ
o-
F
Fa
o
z
oa
F
=
F
z
Js
u,zx
I|-r.o @r-{
cc oc)(f)
c'lI I
=
uJo-
{J
.E
*<u-x=o
)l-=
$
a]t]!
Jzoz.-oze
coO>z
.L tL
J
zar\F
...1 ...':
muJ
oz
F
q
oE(L
UJF
o
E
=
LU
u-o
ul(L
F
co
Eo
-9o
oE
.:
f
o(J
o
F
=Elrlo-zo
F(J
:)Gl-azoO )
Iz,
-r
O
UJ
lrtltll!
-tqtgl.dlol
=dcofi
'.dJH11cl'1 otz
a'! =
anoxo
o-
(noc)
LJJ
=z
(D
'-)-a
UJ
oao
=
llJ
z
(L
f-=tr
|lJt!oo
(L
F
"t
{
&
=Etr
I
\qls
V
N
H
o
2
=
d
=E
ur
oo
=
g
t!g.oo
=
v
oo
a g.
|.!
Go
O
a
=
-
tr
J Li.
UJz
=
I
F
tu
tsI
dF\E(Je#I*6{F
Lr.l
uJ
)
2L
za
>;
JZ
<;
):Fz<)
=#i,z
=g
Ftts irI
o2<- <-lo9.33
6Frr--lt l D<l
7
^z
L
LlJo-
N)
N
'lht.:;,t, fCr:;3 ; i
G\^ - I : 7 iiY ...\\
=
: - - i\-Q=:=,i0 r:,:r-cJ:;;il,i--:?r?;4:z= i7.1<azA-'> '-?z=)r. ii.t:
-i..7;1i::;
=<. .;!.':).
<::-tir=<
I
I
I
I
I
t9r
to
I
I
I
I
I
I
t._,
to
ItrIrl-
t(5
tzt6
NOrrvnlvA
:<E
=ZZU-
F o- 9=Y -1 >1,)==;Y Y uir
aatz>-oOc,a
u-<oq ?u :-i:H 2
- LIJiN(J
=22- E: F3-rt-i3EE iEEEEliPi5 E i.i ? o2<coGlDz=
z
9.1. 2i?F
=d;
urOO-2(J
z
F
Iu--')
ulF
o
Jz
z
=<c0O>z
O- LL
-)."i5
==3dd=
{ lt_l r
'l
F
t
LU
o_
LL
llJ
F
o
E
5
o
z
E
o
E
=E,
lrJ
o-zIF(J
&Fazo()
s/
CN
I
Fo)
z
.J
L!
Ll.l
z
(D
_')a
Eoo
a
L!
z
I
o-
L
O
too
-
=
I
t
O
E
*_'r.)
Xfr.
LUEo
=g.
too
E
Eoo
t
Eco
a
t.
oo
a
Io-
tr(J
E
LIJz
=
F
LT.JF
:c(J
cr
EiP\d(J 'L! < f\^zE "l|.rJF''<52o c'r(_) r'
<oOF
:<
\2*l
t
zt-
=#__J Z
O
<^
YFz()
=<
i,z
=g
E
nl=
=
\JZ
J<Oa9.LIJ U
JO
l]i_]tJ
-ilil
ri-,,lliil
duli N l, l'l
,,1*1'[lllllllil
,l -i il lilt ir lil"'l'-T'-j*'[l'l'"r=[
()
4
[lllql
ll[|[['l
G
9ti
c))Fl:
c,
I
I
F
Z.
1?
\\'
('
i,
,tY
ltl
LTJ
t:--
ii:tt,u.
()
L:
ut
,\l oI tvil lY',\o
t-()
lrJ"'r
C).ft
o-(]zrt<.((L
ao
rxG
o=iUozz)
. -.:
F.hz
.9 q
Otn
ozaAul oa(r<.1 o-dolv ulca cr:
::- tJt
ooz<)
F
s()q
\l
Q)rF
Qs
LuF
o
.a
,i
ErLI
(l'
::
t:
f:()
t)
L:
:::
AJ.--
LtJ
z.
Ot-(J
*J
rtrF(nz
O()
-io.t l'-(( ()
l)t.(
trr r'-() 'a(-)(J
('
L
:l >
.r I l::l ..
-.t (a.a <)(.) l-.
^:
()
ii (i:ii ,.:
F6
c
't
'.()(u
1..
,I:
<)
ft:.(
o
!l(<
I
I
I
I
I
ItzItlIFtil6| 2..t-
I
I
I
:l
(l
.\l\\h
z
12I
F
\\o \\t
uJ
f.'J\
$
q:i;.
o'.x
-JF:
FJil
liii|l
t':
:)
.(
F
i
o_)orL(J
c-
t-
c\w
N\
,\\o
n
0c\\.t.
\
I ll:llI llj: :l r,
lli:iltI llrl i-[iix'i
;I li'.il ?
--L-ll:il lIilil,t ilr,i t
__1_ri:i | ;i
IW
Nr^
UI
\
I
\
F
\
\:
z
:<crc)iiz):l
--, o
--)
t
:;
.<
tl,(L
tl
uJ
(1.
z
_,
I
.{
:c
ttl rii
(r)o
T'J
01160 |PermitNo.
VAIL WATER AND SANITATION DISTRICT
WATER AND SEWER TAP PERMIT
TAP PERMIT WILL NOT BE ISSUED UNTIL TAP FEES HAVE BEEN PAID IN FULL.
NAMEoF;,oa C DS
LOCATION AND LEGAL DESCRIPTION
GENERAL CONTFACTOR
PLUMBING OR MECHANICAL
EXCAVATING CONTRACTOR
SIZE OF TAP:Water
NUMBER oF uNrrs * -a e
DateBill€d
,p
Finance Oirector
sldg.Dept.-Whit€;-WaterandSanitation-Gre€n;-PublicWorks-Canary;-Conlractor-Pink;-Accounting-Goldonrod
,"dl=cnoN REerltsr
TOWN OF VAIL
):. ,.
WED THUR
DATE
READY FOR
LOCATION:
INSPECTION:
JOB NAME
MON
CALLER
TUES .
BUILDING:
E. FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATERtr FRAMING
tr INSULATION tr GAS PIPING
tr SHEETROCK NAIL tr POOL / H. TUB
tr tr
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
D CONDUIT tr SUPPLY AIR
tr
tr FINAL tr FINAL
F APPBOVED tr DISAPPROVED O REINSPECTION REQUIRED
poRRECTTONS:
BEST
IMAGE5
POSSIBLE
DATE INSPECTOR
DATE
rr.rdlecrroN REeuEsr
TOWN OF VAIL
JOB NAME
MON
CALLER
READY FOB
LOCATION:
INSPECTION:'f' *="t;iii-FRI
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
E FOUNDATION / STEEL
tr FRAMING
tr INSULATION O GAS PIPING
tr SHEETROCK NAIL C POOL / H. TUB
tr
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH D EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr
tr FINAL tr FINAL
E APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIBED
DATE INSPECTOR
rrudfecnoN REeuESr
WED THUR FRI
DATE
READY FOR
LOCATION:
JOB NAME
INSPECTION:
CALLER
MoN (je)
BUILDING:
KFOOTTNGS / STEEL
PLUMBING:
O FOUNDATION / STEEu
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATERtr FRAMING
tr INSULATION tr GAS PIPING
tr SHEETROCK NAIL tr POOL/ H. TUB
tr o
tr FINAL tr FINAL
ELECTRIGAL:
O TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
tr FINAL tr FINAL
APPROVED tr DISAPPROVED tr REINSPECTION REQUIRED
i CORRECTIONS:
\J.
TNSPECTOR ;,i
DATE
'"S.cnoN REouEST
TOWN OF VAIL
DATE
READY FOR
LOCATION:
INSPECTION:
JOB NAME
MON
CALLER
TUES WED THUR FRI A I\' ' Df\/|
/t
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
E] ROUGH / D.W.V.
tr ROUGH / WATERtr FRAMING
tr INSULATION tr GAS PIPING
tr SHEETROCK NAIL D POOL / H. TUB
tr tr
tr FINAL tr FINAL
ELEGTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH D EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
tr FINAL tr FINAL
tr APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REOUIRED
, :t .
;J 'i '; tl.INSPECTOR' :it,:,:\'li
.i',1
1 th.Prl.l.rYtva'l
DATE
DATE
,)
rru#ecrroN REeuEsr
TOWN OF VAIL
READY FOR
LOCATION:
INSPECTION:
JOB NAME
MON
CALLER
TUES THUR AM
BUILDING:
E FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
O UNDERGROUND
O ROUGH / D.W.V.
tr ROUGH / WATERtr FRAMING
tr INSULATION tr GAS PIPING
tr SHEETROCK NAIL tr POOL / H. TUB
tr
tr FINAL tr FINAL
ELECTRIGAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr tr
tr FINAL tr FINAL
U APPROVED
COBRECTIONS:
B DISAPPROVED tr REINSPECTION REQUIHED
DATE INSPECTOR
o,or, /- { * E")roB NAME /,
'.4 . . .-l'r-.,.f
rrus#cnoNroul-*oF neouEsr
VAIL
CALLER
READY FOR
LOCATION:
truspecrtoffi
',U;
MON THUR FRI
o
BUILDING:
tr FoorNGS i srdel
PLUMBING:
tr FOUNDATION i STEEL
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATERtr FRAMING
tr INSULATION
O SHEETROCK
r:l
tr GAS PIPING
NAIL tr POOL / H. TUB
fl
tr FINAL tr FINAL
ELEGTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
n
tr SUPPLY AIR
rJ
qTFrr,rnr-
PROVED DISAPPROVED EINSPECTION REQUIBED
oarc t'- r:t - 4V / rNsPEcroR
tr DISAPPROVED
,*d*cnoN REeuEsr
tr REINSPECTION REQUIREDtr APPROVED
CORRECTIONS:
DATE
READY FOR
LOCATION:
BUILDING:PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
T] ROUGH / WATER
E FOOTINGS i STEEL
tr FOUNDATION / STEEL
tr FRAMING
tr INSULATION
tr SHEETROCK
tr GAS PIPING
NAIL tr POOL / H. TUB
tr tr
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr
tr FINAL
tr
tr FINAL
DATE INSPECTOR
IN
t
SPE CTION
TOWN OF
REQUEST
VAIL
DATE JOB NAME
CALLER
N.._ ruEs wED @ FBIREADY FOR
LOCATION::'r'r
BUILDING:PLUMBING:
tr
tr
tr
tr
tr
tr
FOOTINGS / STEEL tr UNDERGROUND
\ noucH / D.w.v.
\ noucx / wArER
FOUNDATION / STEEL
FRAMING
INSULATION tr GAS PIPING
SHEETROCK NAIL O POOL/ H. TUB
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH D EXHAUST HOODS
tr CONDUIT
r'l
O SUPPLY AIR
E
tr FINAL O FINAL
APPROVED
RRECTIONS:
E DISAPPROVED tr REINSPECTION REOUIREDi
DATE t/INSPECTOff
i...*...'..r.
JOB NAME
,#"r,o" REouEsr
TOWN VAI ttl
F
I
,,f
o
4
DATE
READY FOR INSPECTION:
LOCATION;
BU
trl
R'l
trl
trl
trl
tr
FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
FOUNDATION / STEEL
INSULATION tr GAS PIPING
SHEETROCK NAIL tr POOL / H. TUB
tr FINAL
ELECTRICAL:
tr TEMP. POWER
MEGHANICAL:
tr HEATING
tr ROUGH
O SUPPLY AIR
B FINAL
APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
,>/'---,1
DATE INSPECTOR "-
-------7-----;-
i "-"7
-- _-.--_-t*rtnrryrra't
INS CTION
TOWN OF
; "hsii':,q *+!i ,. "jr.,io'
REOUEST
VAIL
JOB NAME CDATE
READY FOR
LOCATION:
CALLER
CTION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr FOUNDATION / STEEL tr
tr
tr
tr
tr
ROUGH / D.W.V.
ROUGH / WATERtr FRAMING
tr INSULATION GAS PIPING
tr SHEETROCK NAIL POOL / H. TUB
B FINAL tr FINAL
ELECTRICAL:
{rerurn. PowER
MECHANICAL:
I] HEATING
tr ROUGH _tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
trr:l
tr FINAL tr FINAL -
tr APPROVED 6lotsnppnoveo REINSPECTION REQUIRED
CORRECTIONS:
INSPECTOR
t
INSPECTION
TOWN OF
REOUESTvAtL .
,^r, t/r/il JoB NAME
MON
CALLER
READY FOR
LOCATION:
INSPECTION:
"*t
TUES WED{"/la -
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
-
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr GAS PIPING
tr POOL / H. TUB
T1
tr FINAL
MECHANICAL:
tr HEATING
tr EXHAUST HOODS
N SUPPLY AIR
tr
tr FINAL
FOUNDATION / STEEL
tr
tr
tr
tr
tr
FRAMING
INSULATION
SHEETROCK NAIL
FINAL
ELECTRICAL:
tr TEMP. POWER
tr
tr
tr
ROUGH
CONDUIT
tr FINAL
tr APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REOUIRED
INSPECTOR
,*r#"toN
TOWN OF
REQUEST
VAIL
t,^r, af f/gt JoB NAME
READY FOR IN ECTION:
LOCATION:
BUILDING:
D FOOTINGS / STEEL
PLUMBING:
\uruoencnouruo
\nouen / D.w.v.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
tr INSULATION tr GAS PIPING
tr SHEETROCK NAIL tr
tr
POOL / H. TUB
tr FINAL N FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
O ROUGH tr EXHAUST HOODS
tr
tr
CONDUIT tr SUPPLY AIR
-CI FINAL tr FINAL
tr APPROVED
CORRECTIONS:
E DISAPPROVED tr REINSPECTION REQUIRED
INSPECTORDATE
#
JOB NAME
INS#CTION REQUEST
TOWN OF VAIL r
:?. f -
CALLER t /.fr:t- t
DATE
READY FOR
LOCATION:
.TUFS WED THUR FRI
n !1 4
L.
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEE-
\ uruoencnouruo
\noucH / D.w.v.
E ROUGH / WATERtr FRAMING
tr INSULATION
tr SHEETROCK
n
tr GAS PIPING
NAIL tr POOL / H. TUB
tr
tr FINAL D FINAL
ELEGTRICAL:
tr TEMP. POWER
MEGHAN!CAL:
O HEATING
tr ROUGH D EXHAUST HOODS
tr CONDUIT
n
tr SUPPLY AIR
tl
tr FINAL tr FINAL
APPROVED
)RRECTIONS:
tr DISAPPROVED tr REINSPECTION REOUIRED
DATE INSPECTOR
#
JOB NAME
r^r#ctoN neouEsr
TOWN OF VAIL c
DATE
READY poR Jrusprcrr r wED @
f'.t /'td /'c Dr
AM PMMONTUES). -A..0 | n,OT /)a f ,^/,- / t---<-.
BUILDING::
tr FOOTINGS / STEEL
PLUMBING:
O FOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D.W.V.
O ROUGH / WATERN FRAMING
tr INSULATION tr GAS PIPING
tr SHEETROCK NAIL
tr
tr POOL / H. TUB
tr
tr FINAL tr FINAL
ELECTRICAL:
{ reue. PowER
MECHANICAL:
O HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
n
tr FINAL
-O FINAL
APPROVED
CORRECTIONS:
E DISAPPROVED tr REINSPECTION REQUIRED
olre 1^ IL- f ,/ rNSPEcroR
,*#"toN neouEsr
TOWN OF VAIL
UR
'7'
/)
t/oarc )/ r{, / { I JoB NAME,I Ci,.i
READY FOR
LOCATION:
INSPECTION:{'l tt'ast l/
CALLER
MON ES WED
/)
B
tr
D
tr
tr
tr
o
UILDING:
FOOTINGS / STEEL
PLUITIBING:
FOUNDATION / STEEL
f, uruoencnouruo
I noucH / D.w.v.
N ROUGH / WATERFRAMING
INSULATION tr GAS PIPING
SHEETROCK NAIL tr POOL / H. TUB
O FINAL tr FINAL
ELEGTRICAL:MEGHANICAL:
D TEMP. POWER tr HEATING
tr
D
tr
ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
D FINAL tr FINAL
tr APPROVED
CORRECTIONS:
tr DISAPPROVED D REINSPECTION REQUIBED
INSPECTORDATE
I rN Tror.r
TOWN OF
REQUEST
VAIL
DATE
READY FOR
LOCATION:
JOB NAME
BI
tr
(
tr
tr
tr
tr
ILDING:PLUMBING:U
FOOTINGS / STEEL D UNDEFGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
FOUNDATION'@
FBAMING
INSULATION
SHEETROCK
O GAS PIPING
NAIL tr POOL / H. TUB
tr
FINAL O FINAL
ELECTRICAL:
tr TEMP, POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
O CONDUIT tr SUPPLY AIR
tr
tr
tr
tr FINAL
tr AppRovED ' .', ,,{orsAppRovEo ,{ nsruseecroN REeutRED
,,, \
/i
(r./ 5(
INSPECTOR.
/
I
,r#.toN
TOWN OF
neouEsr
VAIL
oor= 3'16'B I JoB NAME
READY FOR
LOCATION:
INSPECTION:
APPROVED
CALLER
WED THUR FRI PM
tr DISAPPROVED tr REINSPECTION REQUIRED
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
tr INSULATION
tr SHEETROCK
tr GAS PIPING
tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
O HEATING
tr ROUGH . tr EXHAUST HOODS
tr, CONDUIT tr SUPPLY AIR
tr FINAL tr FINAL
RRECTIONS:
INSPECTOR
*
INSPE crroN'neouEsr
TOWN OF VA|L .
DATE
READY FOR
LOCATION:
CALLER
"@FRr AM&
t
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
UNDERGROUND
O FOUNDATION / STEEL tr ROUGH / D.W.V.
tr ROUGH / WATERfr rnnmrruc -
b rrusulRrroru tr GAS PIPING
tr SHEETROCK tr POOL / H. TUB
tr
tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
D CONDUIT D
tr
SUPPLY AIR
tr
tr FINAL tr FINAL
tr APPROVED PPROVED NSPECTION REQUIRED
CORRECTIONS:
INSPECTOR
tINSilECTION REOUEST
TOWN OF VA|L .
DATE
READY FOR
LOCATION:
JOB NAME
CALLER
PECTION:
BUILDING:
O FOOTINGS / STEEL
PLUMBING:
C] UNDERGBOUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
O FOUNDATION / STEEL
tr FRAMING
tr INSULATION tr GAS PIPING
tr SHEETROCK NAIL tr POOL / H. TUB
tr FINAL tr FINAL
ELE
DI
FF
EC
tr
CTR!CAU MECHANICAL:
TEMP. POWER tr HEATING
ROUGH
-
O EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr FINAL O FINAL
APPROVED
CORRECTIONS:
tr DISAPPROVED O REINSPECTION REQUIRED
INSPECTOR
-.tr''
S#N
OF
cTto
TOWN
.i/ '1 qra*l ! .{ "
REQUESTVAIL :
a
IN
JOB NAME
CALLER
READY FOR
LOCATION:
INSPEC TUES
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
\ noucH / D.w.v.
\ nouox / wArER
tr FOUNDATION / STEEL
tr
tr
tr
n
FRAMING
INSULATION
SHEETROCK
\ cns PtPtNG Pat'Grt
NAIL tr POOL / H. TUB
n
tr FINAL O FINAL
ELECTRICAL:
O TEMP. POWER
MECHANICAL:
tr HEATING
tr
u
tr
ROUGH tr
tr
tr
EXHAUST HOODS
CONDUIT SUPPLY AIR
tr FJNAL D FINAL
OVED tr DISAPPROVED d nerruspecrroN REQUTRED
CORRECTIONS:
INSPECTO
CTION REOUEST
. ,MONi/-/WED THUR FRI
/c
,*, */t /t, JoB NAME
READY FOR INSPECTION:
LOCATION:
BUILDING:
tr FOOTINGS / STEEL
tr FOUNDATION / STEEL !noucn/D.w.v.'.'1r -, ge
tr ROUGH / WATERtr FRAMING
-tr INSULATION tr GAS PIPING
D SHEETROCK NAIL tr POOL / H. TUB
tr FINAL
ELEGTRICAL:
tr TEMP. POWER tr HEATING
tr ROUGH tr EXHAUST HOODS
D CONDUIT tr SUPPLY AIR
tr FINAL
O DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
2.on-
INSPECT
IINSPECTION REQUEST
oor, {/-- /- f z JoB NAME
CALLER
READY FOR INSPECTION:MON TUES WED THUR FRI
LocArloN: /?, y'n t/.^ ','?, /ri ir r' // './-"'/ I
AM PM
TOWN OF VAIL
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
tr INSULATION
tr SHEETROCK
tr GAS PIPING
NAIL tr POOL / H. TUB
tr c
trtr FINAL FINAL
ELECTRICAL:
tr TEMP, POWER
MECHANICAL:
tr HEATING
tr ROUGH D EXHAUST HOODS
tr CONDUIT N SUPPLY AIR
tr tr
tr FINAL
TAPPROvED tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
INSPECTOR
l.
INSPECTION REQUEST
TOWN OF VAIL
DATE
READY FOR
LOCATION:
JOB NAME
II.,ISPECTION:oN.? ruES,/ii/ -
u'
WED
!.,Li 'i,
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D,W.V.
O ROUGH / WATER
tr INSULATION
tr SHEETROCK
tr GAS PIPING
NAIL tr POOL / H. TUB
tr
tr FINAL tr FINAL
ELECTRIGAL:
tr TEMP. POWEB
MECHANlCAL:
tr HEATING
tr BOUGH tr EXHAUST HOODS
E] CONDUIT O SUPPLY AIR
tr FINAL tr FINAL
APPROVED D DISAPPROVED tr REINSPECTION REQUIRED
COBRECTIONS:
u " z zq Ff fq <z*te, .c ;-Ki^,*^r-r !51- . e; r r
?/zt, ., .-. .F'
INSPECTOR
'"il CTION
TOWN OF
REOUEST
VAIL
DATE
READY FOR
LOCATION:
JOB NAME
INSPECTION:
CALLER
MoN tgt WED THUR FRI J_y PM,1' -',
/,>i-'t, ,
OVED
CORRECTIONS:
tr DISAPPROVED tr RETNSPECTTON REOUTFED
BUlLDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
d, rRRvtttc (( ".'
,*gs141;gx 11r,tr GAS PIPING
tr SHEETROCK NAIL tr POOL / H. TUB
C] FINAL tr FINAL
MEGHANIGAL:
tr
tr
tr
tr
TEMP. POWER tr HEATING
tr EXHAUST HOODS
CONDUIT O SUPPLY AIR
INSPECTO(
f ,*#.toN
TOWN OF
neouEsr
VAIL a''r\I-2|"DATE
READY FOR
LOCATION:
JOB NAME
INSPECTION:
L.,t
CALLER
MoN @ WED THUR FRI AM
(/
BUILDING:
E FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr
tr
tr
tr
tr
n
UNDERGROUND
BOUGH / D.W.V,
ROUGH / WATER( rnnv',.rc
tr INSULATION
E SHEETROCK
n
GAS PIPING
NAIL POOL / H. TUB
tr FINAL tr FINAL
ELECTRICAL:
E TEMP. POWER
MECHANICAL:
N HEATING
O ROUGH tr EXHAUST HOODS
tr CONDUIT
f'l
N SUPPLY AIR
n
tr FINAL tr FINAL
tr APPROVED
CORRECTIONS:
B.DISAPPROVED ;flnetruseecrtoru REQUIRED
{:-^s(l' r:t ,:"
p..1Sg*.-
"o:, {*". *.'*,/*
oate 0 INSPECTOR
rlrs#cnoN neouEsr
TOWN OF VAIL
oor, 6-/o-/./-2 z= 2 t
JoB NAME
-
L-/1'
READY FOR
LOCATION:
I
INSPECTION:
CALLER
TUES
BU
tr
tr
trvn
tr
tr
ILDING:PLUMBING:
tr UNDERGROUND
O ROUGH / D.W.V.
B ROUGH / WATER
FOOTINGS / STEEL
FOUNDATION / STEEL
FBAMING
INSULATION E GAS PIPING
SHEETROCK NAIL tr POOL / H. TUB
tr FINAL tr FINAL
ELEGTRICAL:
tr TEMP. POWEB
MEGHANIGAL:
O HEATING
tr ROUGH O EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
n
a,4ltet tr FINAL
y'fl$aoveo tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
INSPECTO
CTION
TOWN OF
REOUEST
VAIL t
JOB NAME
READY FOR
LOCATION:
CTION:?/)THUR FRI -----60 PM
BUILDING:
T] FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
)lrnnurNc -
tr INSULATION tr GAS PIPING
tr SHEETBOCK
E
NAIL tr POOL / H. TUB
tr
D FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH D EXHAUST HOODS
tr CONDUIT
TI
g SUPPLY AIR
E
tr FtilAL tr FINAL
tr DISAPPROVED N BEINSPECTION REQUIRED
CORRECTIONS:
'll ..
n
rNsd
t\ .- ,/t'7i.,it\./l-lr, l({u
CTION
TOWN OF
REQUEST
VAIL
DATE JOB NAME
INSPECTION:MON WED THUR FRI
CALLER
@ ItAMREADY FOR
LOCATION:i 7u:!,,
BUILDlNG:
D FOOTINGS / STEEL
PLUMBING:
O UNDERGROUND
tr ROUGH / D,W.V.
O ROUGH / WATER
O FOUNDATION / STEEL
FRAMING
TNSULATION
SHEETROCK
D GAS PIPING
tr POOL / H. TUB
O FINAL
ELECTRICAL:
D TEMP. POWER
MECHANICAL:
tr HEATING
D ROUGH O EXHAUST HOODS
tr CONDUIT O SUPPLY AIR
D APPFIOVED
CORRECTIONS:
tr-DISAPPROVED b/ netNspecrtoN REout RED
Z): f--
l,- tl , .',t" {;
' ( 1', ",,
'i-',/-,
!-.- i:-
/ /t, rt
..'7!tJ
/-
/k"
/7a--'DATE INSPECTOR
t ,"#"toN REeuEsr
/,,> 4-rl
TOWN OF VAIL
C D.fDATEJOB NAME
MON
CALLER
TUES @ t"'"
'lr ,/'ri 7 -'/
FHIREADY FOR
LOCATION:
INSPECTION:AT'7*
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEE-
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATERtr FRAMING
tr INSULATION
tr SHEETROCK
u_
tr GAS PIPING
NAIL tr POOL / H. TUB
t-l
tr FINAL tr FINAL
ELECTRICAL:
O TEMP. PO
MECHANICAL:
D HEATING
g(noucx tr
tr
n
EXHAUST HOODS
O CONDUIT
tr_
SUPPLY AIR
tr FINAL E] FINAL
PROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
oo-,. /il za'lf/ rNSpEcroR
rN#CTION
TOWN OF
I
REOUE$r
VAIL a
DATE JOB NAME
CALLER
TUES
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEE-
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATERD FRAMING
tr INSULATION tr GAS PIPING
T] POOL / H. TUB
tr
O FINAL tr FINAL
ELECTRICAL:
E TEMP. POWER
MECHANICAL:
tr HEATING
ROUGH D EXHAUST HOODS
tr
n
CONDUIT O SUPPLY AIR
r-1
n nd,,n trtNAl ,4./ 7-
/-'--
P O DISAPPROVED SPECTION REQUIRED
CORRECTIONS:
oor= ,?.--27-f, rNspEcroB.-
F/ ro"
rNs CTION REOUEST
TOWN OF VAIL .
DATE NAME
INSPECTION:MON
\tl
WED
CALLER
@ I
,)
FR o"@READY FOR
LOCATION:-'))
THUR
(_
BUILDING:
tr FOOTINGS
tr FOUNDATI
tr FRAMING
PLUiilBING:
tr UNDEBGROUND
ON / STEEL fl noucH / D.w.v.
flnoucH / wArER
INSULATION Xno. PTPTNG
tr POOL / H. TUB
- tr FINAL
ELECTRICAL:
tr TEMP. POWER tr HEATING
ROUGH D EXHAUST HOODS
CONDUIT tr SUPPLY AIR
D FINAL
PPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION BEOUIRED
INSPECTO
,*#"toN
CALLER
-TUES WED THUR FRI AMREADY FOR
LOCATION:
INSPECTION:
-7 qz-
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
tr INSULATION tr GAS PIPING
O POOL / H. TUB
tr FINAL tr FINAL
ELECTRICAL:
B TEMP. POWER
MECHANICAL:
tr HEATING
ROUGH N EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr FINAL D FINAL
tr APPROVED
CORBECTIONS:
DISAPPROVED EINSPECTION REQUIRED
INSPECTOR
,*#"toN
TOWN OF
neouEsrvAlL 't--tl- /ot./ /1 /DATE // u// t ttoB NAME'L I
READY FOR
LOCATION:
(oJ
@
CALLER
TUES FRI -----Jo,"INSPECTION:
BUILDING:
tr FOOTINGS
tr FOUNDATI
tr FRAMING
/ STEEL
PLUMBlNG:
tr UNDERGROUND
O ROUGH / D.W.V.
tr ROUGH / WATER
ON / STEEL
GAS PIPING
SHEETROCK NAIL POOL / H. TUB
tr FINAL
ELECTRICAL:
tr TEMP. POWER N HEATING
ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr FINAL
tr DISAPPROVED .ION REQUIRED
CORRECTIONS:
INSPECTOR
't.,*#broN. TOWN OF Tf ouE$r
(
JOB NAME
INSPECTION:MON
CALLER -.
1@ *.o
/t-.- | ,,:.1 (,
THUR FRIREADY FOR
LOCATION:(\ I
Atr4
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
O ROUGH / D,W.V.
tr ROUGH / WATERf, rnnvrNc
tr INSULATION
tr SHEETROCK
n
tr GAS PIPING
NAIL tr POOL / H. TUB
n
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP, POWER
MECHANIGAL:
E HEATING
tr ROUGH tr EXHAUST HOODS
O CONDUIT
n
O SUPPLY AIR
r-l
O FINAL ,-;7
B APPBOVED z9J,sARRnoveo '-'..4 REINSPECTION REQU I R ED
CORRECTIONS:
DATE INSPECTOR
,*#"toN
TOWN OF
neouEsrvAlL e
DATE JOB NAME
READY FOR INSPECTION:MON
CALLER
fues,' wED7a i-:t'
THUR FRI
LOCATION:
-:r..Q- - t.l.1,'r: .i / ) j'' C'( ''
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr FOUNDATION / STEEL E ROUGH / D.W.V.
dnoucn / wATERtr FRAMING
tr INSULATION dcns PTPTNG
tr SHEETROCK NAIL tr POOL / H. TUB
ELEGTRICAL:
tr TEMP. POWER
MECHANICAL:
D HEATING
tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr FINAL
O DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
.-/,I
rNstrEg_rl.oN_ BFouEgrTOWN OF VAIL
?o-(J. 0^1uL* / ,>DATE
READY FOR
LOCATION:
INSPECTION:
'i 't Y'
NAME
CALLER _tJ
/-!MON TUES I WED THUR FRI
.''1,/rit-- '/'i. t)
f\IAM,/ PM\-/,/
( ,:. ,.. i , -, 4 )r..t .
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATERtr FBAMING
tr INSULATION tr GAS PIPING
SHEETROCK NAIL tr POOL/ H. TUB
FINAL
tr
tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHA}IGAL:
tr HEAri$A{
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
n/
O SUPPLY AIR
Fl
o,Kot D FINAL
V fraoveo
c'oRRecttotts:
tr DISAPPROVED tr REINSPECTION REQUIRED
f
-
JOB NAME
,fli
--a
,'-
INSPECTION REOUEST
TOWN OF VAIL
DATE
READY FOR
LOCATION:
INSPECTION:TUES WED
BUI
OF
trF
(F
t*"trS
tr-
G:
NGS
DATI
PLUMBING:IILDIN
FOOT
FOUN
FRAM
INSUI
ING
DA'']
ING
.ATI
/ STEEL
ON / STE
tr UNDERGROUND
tr ROUGH / D,W.V.
O ROUGH / WATER
IILDI
FOO
FOU
FRAI
INSL
SHE
toN
)cK
tr GAS PIPING
)ING:
OTIN
UNDI
qMIN
;ULA'
EETR NAIL tr POOL / H. TUB
FINAL
tr'
tr FINAL
ELECTRICAL:MECHANICAL:
tr
tr
tr
tr
TEMP. POWER tr HEATING
ROUGH tr EXHAUST HOODS
CONDUIT D SUPPLY AIR
o
":',@ tr FINAL
., -L OVED tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
INSPECTOR
*
INSPECTION
TOWN OF
a
REQUESTVAIL .
,^r, T//s/ JoB NAME
CALLER
READY FOR
LOCATION:
INSPEC AM@
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V,
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
TNSULATION % trcAS PtPtNG
.SHEETROCK NAIL tr POOL / H. TUB
tr FINAL tr FINAL
EL
tr
tr
D
tr
EGTRICAL:
TEMP. POWER
MECHANICAL:
tr HEATING
ROUGH tr EXHAUST HOODS
SUPPLY AIR
tr FINAL
tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
INSPECTOR
u'1uui
,4
DATE // Joa NnMe
,*#"toN REouE$r- TOWN OF VAIL/'n | .
L //J
.ALLER d_J r, ," .r S{".,-
READY FOR INSPECTTON: 6D TUES WED THUR FRI
-
AM PM
/.t-t.-).+-/,LoCATI6N: rr,t' {t -r/t /),>T, /: PrtTr(
APPBOVED tr DISAPPROVED E REINSPECTION REQUIRED
CORRECTIONS:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
O ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
tr INSULATION tr GAS PIPING
T] SHEETROCK NAIL tr POOL / H. TUB
tr FINAL tr FINAL
ELE
trl
RF
trc
tr_
CTRICAL:MECHANICAL:
TEMP. POWER tr HEATING
ROUGH D EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr FINAL tr FINAL
,or, 7-/fl'Pr rNspEcroR
DATE
READY FOR
I.OCATION:
i
JOB NAME
INSPECTION:, MON72',*t _:.,./ t,/,4 /i /
THUR
UILDING:
O FOOTINGS / STEEL tr UNDERGROUND
tr FOUNDATION / STEEL tr ROUGH / D.W.V.
O FRAMING tr ROUGH / WATER
tr INSULATION tr GAS PIPING
SHEETROCK NAIL tr POOL / H. TUB
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER tr HEATING
N ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
D FINAL
tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
-p-*
INSPECTION
TOWN OF
t a
REQUESTVAIL t
DATE
-), (, l'JOB NAME
,cD CALLER
TUES
. \ .''i
READY FOR INSPECTION:
LOCATION:
WED THUR PM
BUILDING:
tr FOOTINGS / STEEL
PLUIIBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D.W.V.
O ROUGH / WATERD FRAMING
O INSULATION
tr SHEETROCK
n
tr GAS PIPING
NAIL tr POOL / H. TUB
n
tr FINAL tr FINAL
ELECTRICAL:MECHANICAL:
tr
tr
o
TEMP. POWER tr HEATING
ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
-^ ,,. .n.<rvl q_J\_-
D FINAL O FINAL
PROVED
CORRECTIONS:
g DISAPPROVED tr REINSPECTION REOUIBED
INSPECTOR
?+7 +"6/
'"#"toNTOWN OF $FouE$r0
DATE
READY FOR I
LOCATION:
JOB NAME
CALLER
WED THUR
?y' P 'r,'/, /
IUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
O ROUGH / WATER
FOUNDATION / STEEL
tr FRAMING
tr INSULATION O GAS PIPING
C] SHEETROCK NAIL tr POOL / H. TUB
tr FINAL
ELEGTRIGAL:
O TEMP. POWER
MECHANICAL:
tr HEATING
D EXHAUST HOODS
I] CONDUIT O SUPPLY AIR
D FINAL
APPBOVED tr DISAPPROVED tr REINSPECTION REOUIRED
CORRECTIONS:
ome ,/ f - -? ' a// rNSpEcroR
t'
'i,l)""
CTION
TOWN OF
REOUESTVAIL .
DATE JOB NAME L,t<" ^
CALLER /
READY FOR
LOCATION:
ECTION:
f)@ THU FRI
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
O ROUGH / D,W.V.
N ROUGH / WATER
tr FOUNDATION / STEEL
tr FRhMING
-tr INSULATION tr GAS PIPING
tr SHEETROCK NAIL tr POOL / H. TUB
tr FINAL
ELECTRICAL:
tr TEMP. POWER
MEGHANIGAL:
tr HEATING
E EXHAUST HOODS
E CONDUIT tr SUPPLY AIR
FINAL tr FINAL
tr APPROVED
CORRECTIONS:
DISAPPROVED EINSPECTION REQUIRED
,). t, n
grloN_ BEOUE$rTOWN OF VAIL, (c-D]S
17-- 1,./2r {-/tr//DATE
READY FOR
LOCATION:
JOB NAME
; CALLER
INSPECTIoN: MoN TUES WED \IHj!J FRI AM PM1^vtaJl /o)
BUILDING:
D FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
I] UNDERGROUND
D ROUGH / D.W.V.
tr ROUGH / WATERtr FRAMING
tr INSULATION
tr SHEETROCK
n
tr GAS PIPING
NAIL tr POOL / H, TUB
n
D FINAL {rrNnr-
ELECTRICAL:
T] TEMP. POWER
MECHANIGAL:
tr HEATING
tr ROUGH O EXHAUST HOODS
tr CONDUIT
n
D SUPPLY AIR
n
O FINAL tr FINAL -?
=
tr APPROVED
CORRECTIONS:
..li).{tsnppaoveo NSPECTION REQUIRED
lNSPEcroR - '4":.: './.DATE
^r.1"#wr ,t"r,o*TOWN OF
neouE$rvAtL r
DATE
READY FOR
LOCATION:
JOB NAME
PM
BUlLDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
O FOUNDATION / STEEL
D FRAMING
tr INSULATION O GAS PIPING
tr SHEETROCK NAIL tr POOL / H. TUB
tr FINAL
MECHANICAL:
tr
tr
tr
tr
TEMP. POWER tr HEATING
ROUGH O EXHAUST HOODS
tr SUPPLY AIR
tr FINAL
APPROVED
CORRECTIONS:
D DISAPPROVED tr REINSPECTION REQUIRED
rl
,*#"toNTOWN OF
REQUE$TVAIL I
t
JOB NAMEDATE
CALLER
READv FoR rNSpECroN: -,fi-6i) ,rm wED IHUR FRr .------------=- AM pM
LocArloN: L.,T 1r A. t3 tr>,f^f: l>.("t
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEu
tr UNDERGROUND
tr BOUGH / D.W.V.
O ROUGH / WATERO FRAMING
D INSULATION
tr SHEETROCK
n
tr GAS PIPING
NAIL tr POOL/ H. TUB
n
tr FINAL tr FINAL
ELEGTRIGAL:
D TEMP. POWER
MECHANIGAL:
tr HEATING
tr ROUGH D EXHAUST HOODS
tr CONDUIT
n
tr SUPPLY AIR
n
M r,rr.rnr-tr FINAL
tr APPROVED 'blorsnppRoveo EINSPECTION REQUIRED
.CORRECTIONS:
r)1oerc /' '/ - t( < tNsPEcroR
DATE | -z* EL
READY FOR INSPECTION:
;
INSPECTION
U
REOUEETVAIL i
JOB NAME
MON
CALLER
TUES WED THUR FRI PMAM
LOCATION: lot- l/ , t f f2 7a/ ftran, P4- '+ r
TOWN OF VAIL
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
INSULATION GAS PIPING
SHEETROCK NAIL POOL / H. TUB
tr Ell,{rtL tr F|NAL
ELEGTRICAL:
T] TEMP. POWER
MECHANICAL:
T] HEATING
ROUGH tr EXHAUST HOODS
D SUPPLY AIR
tr FINAL
tr DISAPPROVED tr REINSPECTION REOUIRED
COBRECTIONS:
INSPECTOR/DATE /-25-/22
DATE f-zs-Fe
IINSPECTION REQUEST
TOWN OF VAIL I
JoB NAME
<^ ^ R
INSPECTION:@)CALLER
TUES WED THUR FRI
----@
PMREADY FOR
LOCATION:bf /''u l/q
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
O ROUGH / D.W.V.
tr ROUGH / WATERtr FRAMING
tr INSULATION
tr SHEETROCK
n
N GAS PIPING
NAIL O POOL / H. TUB
n
El++l+*ts - t (7o trFrNAL
ELECTRIGAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH EXHAUST HOODS
o coNourr SUPPLY AIR
tr FIDTAL tr FINAL
VED O DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
INSPECTO
,rrt"toN neouE$r
TOWN OF VAIL
/o +-/\)
DATE 'trtt lt'
READY FOR
LOCATION:
INSPECTION:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.tr FOUNDATION / STEEL
tr FRAMING tr ROUGH / WATER
I] INSULATION
tr SHEETROCK
tr GAS PIPING
tr POOL / H. TUB
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr SUPPLY AIR
ED
CORRECTIONS:
tr DISAPPROVED REINSPECTION REQUIRED -
DATE 2 t-Pz-INSPECTOR
. .{:t.-! ."1".i,..
oere Lf 4 ( ->'JoB
NAME
-TL I t)l,/lL-
CALLER /,,ua ct^!/ Q-4o6/
T
\/r{LLtrn ------:--i
READY FOR TNSPECTTON: lUry TUES WED THUR FRr
-AM
PM
LocAroN: /.^-F tr ?-f,.'+o Pr;t?,=
rru#cnoN REouisr
TOWN OF VAIL r
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
O ROUGH / WATEB
tr FOUNDATION / STEEL
INSULATION tr GAS PIPING
SHEETROCK NAIL tr POOL / H. TUB
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
tr ROUGH tr EXHAUST HOODS
tr CONDUIT SUPPLY AIR
tr FINAL
APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
INSPECTION REOUdST
TOWN OF VAIL
DATE
READY FOR
JOB NAME
OCATION:
BOILDING:PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr FOOTINGS / STEEL
D FOUNDATION / STEEL
tr FRAMING tr BOUGH / WATER
tr GAS PIPING
tr POOL / H. TUB
ELECTRICAL:
D TEMP. POWER O HEATING
tr ROUGH
-
I] EXHAUST HOODS
E CONDUIT SUPPLY AIR
tr FINAL
tr DISAPPROVED tr REINSPECTION REQUIRED
CORBECTIONS:
. '- 0-ZDATE --2.-/4-a e- INSPECTOF
,*#"toN. TOWN OF
REOUESTvAlL '*
JOB NAME
CALLER
TUESREADY FOR INSPECTION:MON
LOCATION:
WED THUR FRI AM PM
uNl
BU!LDING:
I] FOOTINGS / STEEL
tr FOUNDATION / STEEL
n ROOF & SHEER" PLYWOOD NAILING tr GAS PIPING
tr POOL / H. TUB
tr SHEETROCK NAIL
tr HEATING
SUPPLY AIR
tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
f^nm^2 q'r' n
---- l4v2<rnflMA &E^*trt * &t *"**r*
I r tl(.,,*#"toN
I'
,o.r, 'l' f 7>f rv' JoB NAME
\) l- (> \,)'.\/' ToWN oF
i ' t '' -, ' (- t- i
REQUESTVAIL .,
CALLER
'\(*1..
"-- ' ,,Lr. .r,
READY FOR
LOCATION:
INSPECTION:MoN rues<ffi rxun FRf
-6w
PM( "{
tr FOUNDATION / STEEL
tr FRAMING
n ROOF & SHEER" PLYWOOD NAIL]NG tr GAS PIPING
POOL / H. TUB
trsH
tr
tr
tr
tr
tr HEATING
T1 SUPPLY AIR
tr APPROVED
CORRECTIONS:
EINSPECTION REQUIRED
9rt?z
LUTL
OJLfu
/U{/4,fu>>-,
INSPECTOR
,*s#"toN REQUESTVAIL t
I
oor, "f f ,.,/ r ^'-- JoB NAME
CALLER/.."', ) ,
rues t(:yryy' rxva FRr ,l!; PM
\- I .i..
READY FOR
LOCATION:
lNSPECTION:MON
BUILDING:
tr FOOTINGS / STEEL
tr FOUNDATION / STEEL
tr FRAMING
n ROOF & SHEER- PLYWOOD NAILING tr GAS PIPING
tr POOL/ H. TUB
NAIL
.d-
tr INSULATION
tr SHEETBOCK
tr ',44--.t
tr FINAL
tr
tr
tr
tr
tr HEATING
tr EXHAUST HOODS
SUPPLY AIR
DISAPPROVED INSPECTION REQUIREDtr APPROVED
CORRECTIONS:
(:'t?-. 1O OA-'t
INSPECTOB
READY FOR
LOCATION:
INSPECTION:
rNsilcnoN neouisr
TOWN OF VA|L '.
JoB NAME /oZ-S /Cldt/ 'T 4rrr *t
\
cALLER €.05 PuPtFXFq
MON TUES WED "U7,Q\-..--
AM
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr
tr
tr
tr
tr
tr
rl
UNDERGROUND
tr FOUNDATION / STEEL ROUGH / D.W.V.
tr FRAMING ROUGH / WATER
...' ROOF & SHEER" PLYWOOD NATLING GAS PIPING
tr INSULATION POOL / H. TUB
tr SHEETROCK NAIL
n
U tr F.NAL
ELECTRICAI.:
tr TEMP. POWER
MECHAI{ICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
n ,1?
tr SUPPLY AIR
tr
i,,y{,tr FINAL4tr DISAPPROVED tr REINSPECTION REQUIRED
CORREGTIONS:
DATE f- rz tc--
)r"'
DATE
READY FOR
LOGATION:
IN#
I
CTION REOUE
OWN OF VAIL
.7/l
lNSPECTION:
JOB NAME
MON
CALLER
TUES WED THUR AM PMIFRI
tr FOUNDAT]ON / STEEL
n ROOF & SHEER- PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL
-
Z
tr HEATING
tr SUPPLY AIR
-
APPROVED
CORRECTIONS:
O DISAPPROVED tr REINSPECTION HEQUIRED
(,5
N4/C4 <s SOP // t/d.PTldttt EE €Eft ttt hJt7z! OrYE W14 ,
P.o. BOX 1842
vAtL, coLoRADO 81658
303/47C0885
SUBSITXARIES
HERITAGE CONTRACTORS
G&GDEVELOPMENTCO.
INVESTMENT DESIGN II{TEBIOBS LTD.
DMG,/bd
12903 COUNTRY RIDGE
sAN ANTONIO, TX.78216
il?49+2195
CONSTRUCTION
INVESTMENTS
August 1O, 1982
Mr. Peter Jamar
Town of Vaif
Building DepartmentVail, Colorado 81658
Dear Mr. Janar:
On Thursday, July 29Ln, 1982, Mr. Jake Span of the Tree Farn
in Fort Collinsr'Colorado, nade a bark inspection on all trees
(aspen & pine) llanted on-Potato Patch, trots 9110r &'ll and
certified that all trees were j-ndeed alive and growing. Howevert
he did state that a nunber of the larger aspen trees had lost :their leaves, but this was due to late planti-ng ohock and would
produce new ieaf growth next sprlng. Atf shrubs are also alive
and growing.
Under our agreenent with the Tree Farrn, they act as our
supplier,/wholesaler for alf naterials and recheck after planting
to see that all rcaterials were planted properlyr if so, they warrant
the materials for fungus grOwth or any inherent plant di-seases.
Therefore, fron that point we guarantee the pJ.anted naterials for
a period 6f one year. Thi-s guarantee is of course contingent upon
the naterj-als being properly cared for during the Jearr and the
responi-sbilj.ty may or nay not be either the hone owner or the
developer based on the ownershi-p of the property. Under the above
terms, CDS Enterprise, warrants and guarantees all fandscaling and
landsiaping naterials-for Potato Patch, lots 9, 1O, & 11r Town of
VaiI, County of Eagle, State of Colorado. Thank you.
Sin elyr
J
luwn
75 loulh trontage road
yail, coloredo 81657
(303) 476-7000
October 16, ]-987
offlce of communlly development
Mr. John Cogswellc/o lIs. MaryAnn MullinVail Beaver Creek Real EstateP.O. Box 7Vail, Colorado 81657
Re: Lot L0, Vail Potato patch lst Filing
Dear John:
According to our file, the above lot contains approximately32,654 square feet. Based on that figure, the allowable GRFAfor this property would be 5,393 square feet. Our fileindicates the primary unit containJ 2t226 square feet and thesecondary unit contains l-,743 square feet for a total of 3,969square feet. Actual square footage for the 1ot and existingstructures would have to be confirmed prior to any additionaldevelopment on this property.
This lot is zoned Prinary/Secondary which lirnits the secondaryunit to no more than 4O? of the allowable square footage.
Enclosed also is the ordinance concerning the add.itional 250sguare feet that may be asked for following the regulations inthe ordinance.
If you have any further questions, please call.
Sineerely,.//''//.//1 .--'/ ,'. - z1 //
,,'u).-/.r 1 fa'r z{ a. /-
Betsy Rlsolack
Planning Technician
Enclosure
rti tu/- ,t v-.'.
rl'-,+.iY P-f
BRW. INC. THE EXCHANGE BUILDING
ffinn$v
T]AVID J. BENNETT
CRAIG A AMUNOSEN
OENVER
June 25, 1986
Mr. Gary MurrainChief Buildi.ng 0fficial
Town of Vail
75 South Frontage RoadVail, C0 81657
RE: Vai1 BuiLding Departrnenr
Punch List Items for Certificate of
Dear Gary:
Attached is the list of itens for finalthat ne discussed during our site visitsall- items for wordi.ng or items left outlist from your office.
Please call me if you have any comnents
Sincerely,
BRW, INCORPORATED
Director of
TPLlmw
Attachrnent
DONALD W RINGFOSE RICHARD P WOLSFELO PEIER E JAFVIS
DONALDE. HUNI MARK G SIVENSON
P.O, BOX 1575 BRECKENRIDGE, COLORADO 80424
0c cu pancy
Certificate ofof June 13.
and send me an
or questions.
LA/VRENC€ J GARDNER
JOHN I MCNAMARA
PLANNING
THANSPORTATION
ENGINEERING
ARCHITECTURE
PHONE 303/453-0774
Occupancy
Please review
official
Thank you.
. BRECKENRIOGE
)
THOMAS F CANROLL
OONALO L CRAIG
MINNEAPOLIS
Architecture
PHOENIX
I rt
VAIL BUILDING DEPARTMENT
PUNCH LIST ITEMS FOR CERTIFICATE OF OCCUPANCY
JUNE 25, 1986
WHITE RIVER
4410 Colurnbine ( lA lJest)
1. Place cap on water valve at east side ( exterior ) .
2. Check utility easement across property for any problems/
conf Lict.
3. Garage/Mechanical Ro oma. Vent to exterior must be stainless steel with sil_iconedseans.
b. Must have 6-inch clearance to door (combustable) (addgyp. board to door or straighten boiler).c. Add back-f1ow preventer to systen.
4. Remove lattice work over sliding glass doors at upper sma1l
Bedroom for egress, then add railing and spindles to codeheight and spacing.
5. At Master Bedroom add rail at two interior windows to keep fromfalling to Living Room below (36-inch height rail).
6. Spacing on ttbridgett i-s too large to neet code. Install infi11
roembers or plexiglass.
7. wi-ndow at northwest Bedroom is not to code width. Add casementwindow.
4410 Columbine (1B East)
1. Add man-door to Garage at south side.
2. Upper Bedroom windows do not meet code. Add casenenrs.
3. Lowest step at exterior entry stair is Loo high. Add anotherstair or raise asphalt..
4. Boiler needs back-flow preventer.
5. Washing machine trap is too high and needs to be lowered.
6. Boiler purnp is leaking; check and correct.
7- Jennair vent connection in Kitchen needs to be tightened up
( under counter ) .
flf(Auq il4&rz4-**--
8. Third story exit ladder shouLd be strengthened and nade morerigid.
9. Landscaping must be completed on utiliLy cut.
!414 CoLunbine Dr-lve (2A South)
1. Steel WF bearns must be cleared off cul-de-sac.
2. Tighten Jennair vent connection in Kitchen.
3. Need fan in lower half-Bathroom.
4. Beam connection above Living Roon stair needs 1-onger bolts,plate on back side, pLus boLts and plates snug to beam.
5. Vent/duct from boiler to exterior appears to be only single-
wa11 construction and does not meet code.
6. Boiler needs back-f l.ow preventer.
7. Water heater vent/duct rnust have t / 4-j-nc]n per foot slope and
f aucet.
8. Add nan-door to Garage, v/est side.
4419 Columbine Drive (4B South)
1. Man-door into Garage needs closer.
2. Reattach entry 1ight.
3. Upper rniddle Bedroom needs f,gatett over trro windows to exteriorto protect from falling out, but a1low egress.
4. Exterior entry stair flai1 nust be blocked out another l inch onboth sides.
5. Fireplace intake vent/duct at exterior needs cover on lJesf,
wa11 .
6. Upper Bedroom deck needs gate at openlng to ladder and anotherspindle near door to meet code on spacing.
7. Boiler must be raised above overflow pan to meet code. A1so,fix seams in pan .
BIGHORN
General Notes
I. Landscaping and driveway paving must be completed.
2. Sewer nust be connected to service.
4074 South Frontaee Road (A)
1. Railing of 36-inch height needed at 1ow wa11 in MasterBathroom. Wal-l- is now onLy 27 inches high.
2. Man-door to Garage: fix hinges and add closer.
3. combustion air to be provided to boiler (two ducts of minimum100 square inches in each).
4. Boiler pressure/tenperature release needs extention to withininches of f1oor.
Dryer needs vent to outside or approved basket
South Frontage Road (B)
Extend pressure rel-ease to within 6 j_nches of f1oor.
Dryer needs vent to outside or approved baske t .
Winding stair to Master Bedroom neets the 1979 F.t.a., whichthe home was built under, but not the 1982 code.
Master Bedroom egress window is higher than code alLows. Needsstair built. below it on a larger window.
4.
407 4
HIGHLAND MEADOhIS
Note
Punch lists for 1974 Vermont and 1788 Sequoia are being prepared bythe Eagle County Building Department.
POTATO PATCH
788 Potato Patch Drive (North
AJ.ready has final Certificate
and South Unit)
of Occupancy.
l.This unit will be condenned andwill be given until floor slab
checked for danage.
no Certificatels replaced and
of occupancythe plumbing is
2.
3.
l.A repair pernit will be required for this unit, but it vill notbe condenned.
Floor slab in northeast corner of lower Fanilyand nust be raised.Room has settLed
Master Bedroon/Bathroom area has settled similar to 792 (A) anrlsLab nust be raised.
'('Vrft"t/e/ */24
A permlt will be required repairs.
box lfi)
vril, colorado 81557
13031 47e5613
department of community development
July 22, 1982
Ken Lli I son
lhar Ken:
This letter ls to confirm that once the 'landscaping on Lots 10 and
11, Block 1, Potato Patch Subdivision is completed as designated
.upon the approved landscape plan, a final Certificate of 0ccupancy
can be issued.
Sincerely,
k,fu^u+)
Town Planner
PJ:df
P.O. BOX 1842
vAtL, coLoRADO81658
3(l3/47F088s
SUBSIUABIES
HERITAGE COT{TRACTOFS
GIGDEVELOPMEIITCO.
INVESTI|E tlT DESIGN INTERIORS LTO.
ool{sTRUcno
tltvEgTtEin
July l, 1982
Mr. tsi.l-l- rlndrews
Tovrn of VaifPublic llorks Departnent
Vail , Colorado
RIJ: Potato Patch Duplex, Lots 10 and l l
Dear I'ir. Andretvs:
As per our conversation of Friday, July 2!9r. 1982, please. be
advised inat t hereby agree vrith your ierns. That any occupant or
vistors to the above- referenced duplex residences rvill not park
any vehicles on the road or roadside in front of these units be-
cause of their inabili-ty to execute the drivervay. It 1s also
understood that this agieement will be binding on any subsequent
purchasers of these units. Thank you for your cooperation and
assi-stance in this natter.
DMG/bd
/J-,(
./
y'1o LA I tc.t
_</ ,
T
y'tvct -r /(& T.a .Ll\,lyoct'C*ONT
t4 cc ve *CcLnrffu. V -:*
Aaatf ( cA7(ad.
erely,
I nt 4e
lPt,Zt e'17
129oil COUNTRY RIDGE
3AN ANTON|O, TX.78216
.?J49d'.2195
il^r4W
Cs l r\,1ce n-70L/
H a rtFord-. Con necticu t
(A STOCK COMPANY)
CONTRACT BOND
KNOW ALt MEN BY THESE PRESENIS, Ihot
l+59, E. Frontage nA. #
BoodNo. l$?frt2!
cqllcd thc Prlnclpol; ond THE IRAVETERS INDEMNITY COMPANY, collcd tfic Surcty, orc hcld ond firmly bond unio-
Kenneth l{. I{lJ.g@ gtd
o copy of whidr ir by rcfcrcncc modc o porl hcrcof;
NOW, IHEREFORg thc conditlon of thlr obllgction b rudr, thql lf fhc Prlncipot rholl foithfulty pcrform lhc controct in
ftb porf, frcc ond clcor of oll llcn: orblng ori of doimr for lobor ond nolcrlols .nlcrlng Inlo ilrc colufruclion, ond lndcmnify
ond sovc hormlerr ilrc Obllgcc ftom oll los, cocl or domogc whidr hc moy rufier by rcoron of lhc fsilurc co to do, ltcn lhlr
obligotior sholl bc void; ofhcrvlrc !o rcrnoh in full forcc ond cficct
pROVIDED, HOWEVE& rhor no wlt rholl bc brought on thls bond o51"r 6. F!rs0 rrear afben corsojletLO
-
19-
SIGNED, SE TED AND 911gP 6;r- 18th dot
The Trqvelerr
9L{ tW. l{l td. AFll l?a0 rrrrt.o ri u.i.r.
---f-
*-^
-.---__\_
The Travelers Indemnity Company
Hartford, Connectlcut
POWER OF ATTORNEY
EI|OW ALL MEN BY TIIESE PRESENTS:
That THE TRAVELERS INDEMNITY COMPANY, a corporation of the State of Connecticut,
doer hereby make, constitute and appoint
_
Febecca K. Amann, Albento Paez, Stephen T. Pate, Susan M. Perry, larry Blchardsont
M. .I. Saucten, Bobert West, al1 of Englewoodr Coloredo, EACH
itc true and lawful Attorney(s)-in-Fact, with full power and authority, for and on behalf of the Company
ar lurcty, to execute and deliver and affix the seal of the Company thcreto, if a seal is required, bondr,
undcrtakings, recognizances, consents of surety or other written obligations in the nature thereof, ac followr:
recognizances, consents of gureti
the nature thereof
'Any and all bonds, undertakJ.ngs,
or other wrlbten obllgatlons ln
Thls power of attorney revokes that dated Aprll 27, 1981 on behalf
Rebecca K. Arnann, Sanuel Faucett, Alberto Paez, Stephep T. Patet
Susan M. Perny, Larry Rlchardson, M. J. Saucier, lfarreq R. Wj.throw
IN WITNESS WHEREOF, THE TRAVELERS INDEMNITY COMPANY has caused thesc
presents to be signed by its proper officer and ite corporate seal to be hereunto affixed this Ath
day of August l9 91.
TEE TRAVELERS INDEMNITY COMPAIVY
Secretary, Surety
State of Connecticut, County of Harfford-ss:
On this 4bh day of August in the year 1981 before me personally
came D. J. Nash to me known, who, being by me duly sworn, did depose and say: that he resides in
the State of Connecticut; that he is Secretary (Surety) of THE TRAVELERS INDEMNITY COMPANY,
the corporation described in and which executed the above instrumenh that he knows the seal of said
corporation; that the seal affixed to said instrument is such corporate seal; that it was so affixed by
authority of his office under the by-laws of said corporation, and that he signed his name thereto by
like authority.
end to bind THE TRAVELERS INDEMNITY COMPANY thereby, and all of the act! of said Attomcy(r)-
in-Fact, purcuant to thes€ prelents, arc hereby ratifed and confirmed.
Thir appointment is made under and by authority of the following byJawr of thc Company which byJawr
are now in full force and effect:
Anncr.r IV, SEcrroN 14. The Chairnran of the Bord, the President, the Chairman of the Finance Committee,
any Exccutive Vice President, any Senior Vice Presidcnt, any Vice Prcgident, any Second Vice Prcsident, thc
CorPorate Secretary or any Departnrcnt Sccr€tary nray apgbint attorneys-in-fadt or agents with Dower and
authority, as defined or limitcd in their respective powers of atiorney, for anii on behalf of tlie Company to erecute
and dclivcr, and affix the seal of the Corioany thereto, bonds. uridertakincs. recosnizances, coriscnis of surety
or other written obligations in the rraturc tier6of and airy of said officers mii remdve any such attorney-in-faci
or agent and revoke lhe power and authority given to him.
Arncr.e lV, SEcttoN 16. Any bond, undertaking, recognizance, consent of surety or written obligation in the
nature ther€of shall be valid and binding upon thi Com-parry wher signed by the Chainnan of thi Board, the
President, the Chairman of the Financetoirrrnittee, any Exlcutive Vice Pre.sident, any Senior Vice President,
any Vic-e President or any Second Vice President and d[ly attested and sealed, if a seal'is required, by the Cor-
porate Secretary or any DeDartment Secretarv or any Assi;tflnt Cormrat€ Secretarv or anv Assistant DaDartment
Secretary, or shall be valid and bindinc uoori the Conroany when dulv executcd and ,eafed. if a seal is ieouired.
py a d.uly authorized attorney-in-fact;r agent, pur.uint to and within the limits of the authority granied b1;
nrs or ner power ol attorney.
This power of attorney is signh and gealed by faceimile under and by the authority of the fotlowing Resolu.
tion adopted by the Directors of THE TRAVELERS INDEMNITY COMPANY at a m€etin8 duly called
and hcld on the 30th day of November, 1959:
VorED: That thc signature of any o6ccr authorizcd by the By-[.aws end the Company :eal may bc affixed by
facsimile to any powcr of attorney or rprccial powcr of attorncy or ccrtiication of cither giwn for the exccution of
any bond, undertaking, recognizancc or other written obligation in the nature thereol; such signature and seal,
whcn so used being hcrcby adopted by thc Company as thc original rignaturc of such officer and thc original seal
of thc Company, to bc valid and binding upon thc Company with thc samc forct and effcct as though manually
effixed.
of
By
Notary Public
My commission expires Aprll 1, 1983
S-1E80 Rcv. {-78 hntcd ln U.S,A,
6i:r.?:{iab
#
fffimS r\\b $
ro@ouG j
\Silat#
(Over)
c
THE AMERICAN INSTITUTE OF ARCHITECTS
AIA Document A107
Standard Form of Agreement Between
Owner and Contractor
Short Form Agreement for Small Construction Contracts
Where the Basis ol Payment is a
STIPULATED SUM
THiS DOCUMENT HAS TMPORTANT tf6At CONSfQUfNCES; CONSULIATION W|TH
AN ATIORNEY 15 TNCOURAC€D WITH RESPECT TO
'TS
COMPLETION OR MODIFICAT'ON
For other contractJ the AIA jssues Standard Forms ol Owner-Contractor Agrcements and Standard General ConditionsoI the Contract lor Construction lor use in connecaion therewith.
This document has been approved and endorsed by The Associated Ceneral Contracto.s of America.
C
(
ACREEMENT
made this l5rh
Hundred and Eighty-t^'o
January in the year Nineteen
and Joyce Orleary lJllson
day of
BETWEEN the Owner: Kennerh W. Wilson
and/or asslgns
and the Contractor: Dan M. Gagliardo
the Project:
the Architect:
The Owner and Contractor agree as set forth below.
Lots I0 and LL, Block I, Vail Potato Patch Subdlviglon, Town
of Vai1, Eagle County, Colorado.
AIA DOCUMENT A1O7 . sMAI.L CONSTRUCTION CONTRACT. JANUARY 1974 TDITION . AIA@. @1974
THE AMTRICAN INSTITUTE OT ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D. C. 20@6
C
ARTICI.E 1
THE WORK
The Contractor shall perform all the Work required by the Contract Documents for
(lrer. lnt..l lhc cTption detcriptive ol thc Work .s uted otr othcr Cortrrca Docum.naJ.,
1. Landscaping aB per the plans approved bydthe Town of Vall
2. Drlveway Pavlng and Heating aa per the plans approved by the Townof Vall
3. Addltlonal Roch work on exterlor fireplace flues as per the plang
approved by the Town of VaiL.
ARTICTE 2
TIME OF COMMENTEMEI.JTTND COMPTETION
The Work to be performed under this Contract shall be commenced as gooo as weather pernlt6' SPrlng
1982, but not later than June L, L982. In the event weather does not permlt
start by June 1, 1982, .thls agreement start date nay be extended to coincLde wtth
, qx.tqntions to the Conditlonal Certlflcate of Occupancy as granted by the Townand completed of vall-. In the event Tor/D of Vall does not grant said extentlons by
June 15, 1982, Gontractor shall be deemed 1n default.
Work Shall be compLeted bv July I, 1982.
AR,NCLE 3
CONTRACT SUM
The. Owner shall pay the Contractor for the performance of the Work, subject to additions and deductions by Change
Order as provided in the General Conditions, in current funds, the Contract Sum of
fst.te ,rere the lump sum afiount, saia p,icet, or both, as deshed.)
l. Landscaplng - $22,000.00
2. Driveway Pavlng and Heatlng - $8,000.00
3. Flrepl.ace Rock Work - #7,000,00
Total work
Plus Contlngency
Total Contract Sun
$37 , 000 .00
3 ,000 .00
$40,000.00
AIA DOCUMENT A1O7 . SMALI CONSTRUCTION CONTRACT . IANUARY 19ZI IDITION . AIA@. @1974
THE AMTRICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE,, N.W., WASHTNGTON, O. C. 20006
o
ARTICTE 4
PROGRESS PAYMENTS
8ased. upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment
lssued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the Contractor
as follows:
N/A
ARTICIE 5
NNII-FIVMENT
The _Owner shall make final payment N/A days after completion. of the Work, provided
the Contract be then fully performed, subiect to the provisions of Article 16 of the General Conditions.
ARTICTE 6
ENUMERATION OT CONTNECT DOCUMENTS
The Contract Documents are as noted in Paragraph 7.1 of the Ceneral Conditions and are enumerated as follows:
(Lira bclow th. AtreemenL Condiaio',t ol lhe Contt.ca lGene..l, Sopden'|,.na.ty, end oth.t Coaditioat), D,rwin$, Wcificationt, Addenda aod .GG'Jpa?dA,tatnatas, shorttng prta o, sheet nul'fiatt in alt caiat a,rd datet whera aoplicabre-)
N/A
al
AIA DOCUMENT A1O7 . SMAI,I CONSTRUCTION CONTRACT.
'ANUARY
197,I €OITION . AIA@ . @1974
THE AMERTCAN |NST|TUTE OF ARCH|TICTS, 1735 NEW YORK AVE., N.W., WASHTNCTON, O. C. 20006
t'(CENERAL CONDITIONS
((
ARTICLE 7
CONTRACT DOCUMENTS
7.1 The Contract Documents consist of this Agreement
(which includes the Ceneral Conditions), Supplementary
and other Conditions, the Drawings, the Specifications,
all Addenda issued prior to the execution of this Agree-
ment. all modifications, Change Orders, and written
interpretations of the Contract Documents issued by
the Architect. These form the Contract and what is
required by any one shall be as binding as if required
by all. The intention of the Contract Documents is to
include all labor, materials, equipment and other items
as provided in Paragraph 10.2 necessary for the proper
execution and completion of the Work and the terms
and conditions of payment therefor, and also to include
all Work which'may be reasonably inferable from the
Contract Documents as being necessary to produce the
intended results.
7.2 fhe Contract Documents shall be signed in not less
than triplicate by the Owner and the Contractor. l{ either
the Owner or the Contractor do not sign the Drawings,
Specifications, or any of the other Contract Documents,
the Architect shall identify them. By executinB the Con-
tract, the Contractor represents that he has visited the
site and familiarized himself with the local conditions
under which the Work is to be performed.
7.3 The term Work as used in the Contract Documents
includes all labor necessary to produce the construction
required by the Contract Documents. and all materials
and equipment incorporated or to be incorporated in
such construction.
ARTICTE 8
ARCHITECT
8.1 The Architect will provide general administration
of the Contract and will be the Owne/s representative
during construction and until issuance of the final Certi-
ficate for Payment.
8.2 The Architect shall at all times have access to the
Work wherever it is in preparation and progress.
8.3 The Architect will make periodic visits to the site
to familiarize himself generally with the pro6ress and
quality of the Work and to determine in general if the
Work is proceeding in accordance with the Contract
Documents. On the basis of his on-site observations as
an architect, he will keep the Owner informed of the
progress of the Work, and will endeavor to tuard the
Owner against defects and deficiencies tn the Work of
the Contractor. The Architect will not be required to
make exhaustive or continuous on-site inspections to
check the quality or quantity of the Wotk. The Archi-
tect will not be responsible for construction means,
methods, techniques, sequences or procedures, or for
safety precautions and programs in connection with the
Work. and he will not be responsible for the Contractor's
failure to carry out the Work in accordance with the
Contract DocumentS.
8.4 Based on such observations and the Contractot's
Applications for Payment, the Architect will determine
the amounts owing to the Contractor and will issue Cer'
tificates for Payment in accordance with Article 16'
8.5 The Architect will be, in the first instance, the in-
terpreter of the requirements of the Contract Documents.
He will make decisions on all claims and disputes be-
tween the Owner and the Contractor. All his decisions
are subject to arbitration.
8.6 The Architect will have authority to reject work
which does not conform to the Contract Documents.
ARTICI.E 9
OWNER
9.1 The Owner shall furnish all surveys.
9.2 The Owner shall secure and pay for easements for
permanent structures or permanent changes in existing
facilities.
9.3 The Owner shall issue all instructions to the Con-
tractor throuBh the Architect.
ARTICTE 10
CONTRACTOR
10,1 The Contractor shall supervise and direct the
work, using his best skill and attention. The Con-
tractor shall be solely responsible for all construction
means, methods, techniques, sequences and procedures
and for coordinating all portions of the Work under
the Contract.
10.2 Unless otherwise specifically noted, the Contractor
shall provide and pay for all labor. materials, equipment,
tools, construction equipment and machinery, water,
heat, utilities, transportation, and other facilities and
services necessary for the proper execution and comple-
tion of the Work.
10.3 The Contractor shall at all times enforce strict
discipline and good order among his employees, and
shall not employ on the Work any unfit person or any-
one not skilled in the task assigned to him.
10.4 The Contractor warrants to the Owner and the
Architect that all materials and equipment incorporated
in the Work will be new unless othen,vise specified, and
that all Work will be of good quality, free from faults
and defects and in conformance with the Contract Docu-
ments, All Work not so conforming to these standards
may be considered defective,
10.5 The Contractor shall pay all sales, consumer, use
and other similar taxes required by law and shall secure
all permits, fees and licenses necessary for the execution
of the Work.
10.5 The Contractor shall Sive all notices and comply
with all laws, ordinances, rules, regulations, and ordets
of any public authority bearing on the performance of
AIA DOCUMENT A1O7 . SMA[[ CONSTRUCTION CONTRACT T JANUARY 1974 EOTTION . AIAO . 01974
THE AMERTCAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., W SHINGTON, D. C. 20006
lhe. Work, and shall notify the Architect if the Drawings
and Specifications are at variance therewith.
10.7 The Contractor shall be responsible for the acts
and omissions of alt his employees and all Subcon-
tractors, their agents and employees and all other persons
performing any of the Work under a contract with the
Contractor,
10.8 The Contractor shall review, stamp with his ap-proval and submit all samples and shop drawings as
directed for approval of the Architect for conformance
with the design concept and with the information given
in the Contract Documents. The Work shall be in ac-
cordance with approved samples and shop drawings.
10.9 The Contractor at all times shall keep the premises
free from accumulation of waste materials or rubbish
caused by his operations. At the completion of the Work
he shall remove all his waste materials and rubbish from
and about the Proiect as well as his tools, construction
equipment, machinery and surplus materials, and shall
clean all glass surfaces and shall leave the Work,,broom
clean" or its equivalent, except as otherwise specified.
10.10 The Contracto. shall indemnify and hold harmless
the Owner and the Architect and their agents and em-
ployees from and against all claims, damages, losses and
expenses including attorneys'fees arising out of or result-
ing from the performance of the Work, provided that
any such claim, damage, loss or expense (1) is attribut-
able to bodily injury, sickness, disease or death, or to
injury to or destruction of tangible property (other than
the Work itself) including the loss of use resulting there-
from, and (2) is caused in whole or in part by any
negligent act or omission of the Contractor, anv Sub-
contractor, anyone directly or indirectly employed by any
of them or anyone for whose acts any of them may be
liable, regardless of whether or not it is caused in part
by a party indemnified hereunder. In any and all claims
against the Owner or the Architect or any of their agents
or employees by any employee of the Contractor, any
Subcontractor, anyone directly or indirectly employed by
any of them or anyone for whose acts any of them may
be liable, the indemnification obligation under this Para-
graph 10.10 shall not be limited in any way by any limi-
lation on the amount or type of damages, compensation
or benefits payable by or for the Contractor or any Sub-
contractor under workmen's compensation acts, dis-
ability benefit acts or other employee benefit acts. The
obligations of the Contractor under this Paragraph 10.10
shall not extend to the liability of the Architect, his
agents or employees arising out of (1) the preparation
or approval of maps, drawings, opinions, reports, sur-
veys, Change Orders, designs or specifications, or (2) the
8ivin8 of or the failure to give directions or instructions
by the Architect, his agents or employees provided such
giving or failure to give is the primary cause of the
iniury or damage.
ARTICLE 11
SUECONTRACTS
11.1 A Subcontractor is a person who has a direct
contract with the Contractor to perform anv of the Work
at the site.
11.2 Unless othenvise specified in the Contract Docu-
ments or in the Instructions to Bidders, the Contractor,
as soon as practicable after the award of the Contract,
shall furnish to the Architect in writing a list of the
names o{ Subcontractors proposed for the principal por-
tions of the Work. The Contractor shall not employ any
Subcontractor to whom the Architect or the Owner mav
have a reasonable objection. The Contractor shall noi
be required to employ any Subcontractor to whom he
has a reasonable objection. Contracts between the Con-
tractor and the Subcontractor shall be in accordance with
the terms of this Agreement and shall include the Ceneral
Conditions of this Agreement insofar as applicable.
ARTICTE 12
SEPARATE CONTRACTS
12.1 The Owner reserves the right to award other con-
tracts in connection with other portions of the Project
or other work on the site under these or similar Condi-
tions of the Contract,
12.2 The Contractor shall afford other contractors rea-
sonable opportunity for the introduction and storage of
their materials and equipment and the execution of their
work. and shall properly connect and coordinate his
Work with theirs.
12.3 Any costs caused by defective or ill+imed work
shall be borne by the party responsible therefor.
ARTICTE 13
ROYATTIES AND PATENTS
The Contractor shall pay all royalties and license fees.
The Contractor shall defend all suits or claims for in-
fringement of any patent rights and shall save the Owner
harmless from loss on account thereof.
/)
ARTICLE 14
ARBITRATION
All claims or disputes arising out of this Contract or the
br6ach thereof shall be decided by arbitration in accord-
ance with the Construction Industry Arbitration Rules of
the American Arbitration Association then obtaining un-
less the parties mutually agree otherwise. Notice of the
demand for arbitration shall be filed in writing with the
other party to the Contract and with the American Arbi-
tration Association and shall be made within a reasonable
time after the dispute has arisen.
ARTICTE 15
TIME
15.1 All time limits stated in the Contract Documents
are of the essence of tha Contract.
15.2 lf the Contractor is delayed at any time in the
progress of the Work by changes ordered in the Work,
by labor disputes, fire, unusual delay in transportation,
unavoidable casualties, causes beyond the Contractor's
control, or by any cause which the Architect may de-
termine justifies the delay, then the Contract Time shall
be extended by Change Order for such reasonable time I
as the Architect may determine.
AIA
THE
DOCUMTNT A1O7 . SMALL CONSTRUCTION CONTRACT I JANUARY 1974 EDITION . AIAO . @1974
AMTRICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, O. C. 20006
rc
,i
PAYMENTS
15.1 Payments shall be made as provided in Article 4
of this Agreement.
15.2 Payments may be withheld on account of (1) de-
fective Work not remedied, (2) claims filed, (3) failureof the Contractor to make payments properly to Sub-
contraclors or for labor, materials, or equipment, (4)
damage to another contractor, or (5) unsatisiaciory prose-
cution of the Work by the Contractor.
15.3 Final payment shall not be due until the Con-
tractor has delivered to the Owner a complete release ofall liens arising out of this Contract or receipts in full
covering all labor, materials and equipment for which alien could be filed, or a bond satisfactory to the Owner
indemnifying him against any lien.
15.4 The making of final payment shall constitute a
waiver of all claims by the Owner except those arisins
f rom (1) u.nsettled liens, (2) faulty or defective Work apl
pearing after Substantial Completion, (3) failure of the
Work to comply with the requirements of the Contract
Documents, or (4) terms of any special guarantees re-quired by the Contract Documents. The acceotanceof final payment shall constitute a waiver of all claims
by the Contractor except those previously made in writ-
ing and still unsettled.
ARTICLE 16
ARTICIE 17
other employee benefit acts, 'from claims for damages
because of bodily injury, including death, and from claims
for damages to property which may arise out of or result
from the Contractor's operations under this Contract,
whether such operations be by himself or by any Sub-
contractor or anyone directly or indirectly employed by
any of them. This insurance shall be written for not less
than any limits of liability specified as part of this Con-
tract. or required by law, whichever is the greater, and
shall include contractual liability insurance as applicable
to the Contractor's obtigations under Paragraph 10.10.
Certificates of such insurance shall be filed with the
Owner and each separate Contractor.
ARTICLE 19
OWNER'S tINgITITY INSURANCE
The Owner shall be responsible for purchasing and
maintaining his own liability insurance and, at his op-
tion, may maintain such insurance as will protect him
against claims which may arise from operations under
the Contract.
ARTICLE 20
PROpEnry lHsunnrvct
20.1 Unless otherwise provided, the Owner shall pur-
chase and maintain property insurance upon the entire
Work at the site to the full insurable value thereof. This
insurance shall include the interests of the Owner, the
Contractor, Subcontractors and Sub-subcontractors in the
Work and shall insure against the perils of Fire, Extended
Coverage, Vandalism and Malicious Mischief.
2O.2 Any insured loss is to be adjusted with the Owner
and made payable to the Owner as trustee for the
insureds, as their interests may appear, subject to the
requirements of any mortgagee clause.
20.3 The Owner shall file a copy of all policies with
the'Contractor prior to the commencement of the Work,
20.4 The Owner and Contractor waive all rights against
each other for damages caused by fire or other perils
to the extent covered by insurance provided under this
paragraph. The Contractor shall require similar waiven
by Subcontractors and Sub-subcontractors.
ARTICTE 21
culNcrs rN rHFwonx
21,1 The Owner without invalidating the Contract may
order Changes in the Work consisting of additions, de-
letions, or modifications, the Contract Sum and the Con-
tract Tim€ being adjusted accordingly. All such Changes
in the Work shall be authorized by written Change Order
signed by the Owner or the Architect as his duly author-
ized agent.
21.2 The Contract Sum and the Contract Time may be
changed only by Change Order.
21.3 The cost or credit to the Owner from a Change in
the Work shall be determined by mutual agreement.
(
PROTTCTION OF PERSONS AND PROPERTY
The Contractor shall be responsible for initiating, main-
taining, and supervising all safety precautions aiid pro-
grams in connection with the Work. He shall take all
reasonable precautions for the safety of, and shall provide
all reasonable protection to prevent damage, inlury or
loss to (1) all employees on the Work and other perions
who may be affected thereby, (2) all the Work and all
materials and equipment to be incorporated therein,
and (3) other prope(y at the site or adiacent thereto.
He shall comply with all applicable laws, ordinances,
rules, regulations and orders of any public authority
having jurisdiction for the safety of persons or property
or to protect them from damage, injury or loss. All
damage or loss to any property caused in whole or inpart by the Contractor, any Subcontractor, any Sub-
subcontractor or anyone directly or indirectly employed
by any of them, or by anyone for whose acts any' of
them may be liable, shall be remedied by the Contractor,
except damage or loss attributable to faulty Drawings or
Specificalions or to the acts or omissions of the Owner
or Architect or anyone employed by either of them or
for whose acts either of them may be liable but which
are not attributable to the fault or negligence of the
Contractor.
ARTICTE 18
CONTRACToI5 TJATIIfY INSURANCE
The Contractor and each separate Contractor shall pur-
chase and maintain such insurance as will protect him
from claims under workmen's compensation acts and
DOCUMTNT A.IO7 . SMA[[ CONSTRUCTION CONTRACT .
AMERICAN INSTITUTE OF ARCHITICTS. 1735 NEW YORK
AIA
THE
IANUARY 1971 EDITION . AIAO . @1974
AVE., N.W., WASHINGTON, D. C. 20006
CORRECTION OF WORK
The Conrractor shall correct any Work that fails to con-
form to the requirements of the Contract Documents
where such failure to conform appears during the
progress of the Work, and shall remedy any defects
due to faulty materials, equipment or workmanship which
appear within a period of one year from the Date of
Substantial Completion of the Contract or within such
longer period of time as may be prescribed by law or by
the terms of any applicable special guarantee required
by the Contract Documents. The provisions of .this Article
22 apply to Work done by Subcontractors as well as to
Work done by direct employees of the Contractor.
ARTICIE 23
trnutNeilon w ttt coNTMcToR
lf the Architect fails to issue a Certificate of Payment
for a period of thirty days through no fault of the Con-
tractor, or if the Owner fails to make payment thereon
for a period of thirty days, the Contractor may, upon
seven days' written notice to the Owner and the Archi-
tect, terminate the Contract and recover from the Owner
payment for all Work executed and for any proven loss
sustained upon any materials,. equipment, tools, and
construction equipment and machinery, including rea.
sonable profit and damages. ';;
TERMINATION BY THE OWNER
lf the Contractor defaults or neglects to carry out the
Work in accordance with the Contract Documents or
fails to perform any provision of the Contract, the Owner
may, after seven days' written notice to the Contractor
and without preludice to any other remedy he may have,
make good such deficiencies and may deduct the cost
thereof from the payment then or ther€after due the
Contractor or, at his option, may terminate the Contract
and take possession of the site and of all materials, equip-
ment, tools, and construction equipment and machinery
thereon owned by the Contractor and may finish the
Work by whatever method he may deem expedient, and
if the unpaid balance of the Contract Sum exceeds the
expense of finishing the Work, such excess shall be paid
to the Contractor, but if such expense exceeds such
unpaid balance, the Contractor shall pay the difference
to the Owner,
ARilCtE 22 )
ARTICLE 25
MrscErtANEous PRovrsroNs
\.
1. Should degcrlbed lfork be unconpleted''bl'.hi1y 1, 1982, wlth the )r
Town of Vall belng the authorlty on.wether or,not.the work is ,
consl-dered complete, Owner eha11 have.the rLght to take nhat-
ever steps Oluner deems neceaeary to conplete the Work inciuding
but not llmlted to the caehing of the Perfornance Bond insuring..
that sald I'lork wlll be done.
-)
AIA DOCUMTNT 4107 . SMALL CONSTRUCTION CONTRACT r IANUARY 1971 EDITION . AIAO . Ol9Zt
THE AMTRICAN INSTITUTE OI ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, O. C. 20006
C
This Agreement executed the day and year first written above.
CONTRACTO
AIA DOCUMENT At07 ' SMA| r CONSTRUCTTON CONTRACT . ,ANUARY 1974 EDIT|ON . A|AO . 01974THE AMERICAN INSTITUTE OI ARCHTTECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D. C. 2(IP5
P.O. BOX 1842
vAtL, COLORADO 81658303/47&0885 .
SUBSIOIAFIES
HERITAGE CONTRACTOFS
G&GDEVELOPMENTCO.
INVESTMEUT DESIGN INTEBIORS LTO.
July 29,1981
It. Steve latterson
lulldlng lepartment
Town 0f Vall
lox 100
Va11, Colorado 81558
Eear Steve:
Please transfer all
11sted projects to
Col o::aclo.
pernlt #
:'3. Unlts J'pernlt #
A. Lots 10,11 t 31ock 1, PotatP Patch subdlvlslon,
constructlon penuits and deposlts on tbe below
Trl-R Development, lIc.# 253'A, Box )222, Yat!t
6, and f, I{oodrldge Townhouses, larcel C,
sted pernlts and deposltst
XODIN U.
the
,.7
('
trl-R Developurentr acc
3Y
much ,
12903 COUNTRY RIDGE
SAN ANTONIO, TX.78216
512.t494-2'195
CONSTRUCTION
INVESTMENTS
abov
Thanf
ICDS
P.O. BOX 1842
VAIL, COLORADO 81658
303/476-0885
SUBSIDIARIES
HEFITAGE CONTRACTORS
G&GDEVELOPMENTCO.
INVESTIIENT DESIGN INTEFIOFS LTD.
12903 COUNTRY RIDGE
sAN ANTON|O, TX.78216
512t49d-2195
CONSTRUCTION
INVESTMENTS
December 29, t98I
Peter Janar
Town Planner
Depa.rtnent of Cornnunlty Developnent
Torm of Va1I
P.0. Box 100
Va11", Colo:rado 8165?
Dear Peterr
DMG/bd
Sl4qere1y, oilo&Pr
Dan M. caelra$
q$\N
Thank you for your letter outl 1nlng the Boards approvcd revlslons
on lots 10 and 11. Itens 1 thur 11 rtll be conpleted as outl1ned.
My only request ls that should we ha.ve a prolonged winter, that we
be prenltted to request an extenslon of the July 1, 1982 landscape
compllance date. I have slgned the landscape plan wlth the DRB
notatlons on lt as an acceptance for your flles.
Thank you very nuch for your contlnued asslstance and coopelatlon
1n this natter.
/-.(.,
I
l._i
;1
li
, r't
u,"*,-- / v'Y^-:\:.f
,",.01.*,t;1f,,{r}
C
,lo
,^
6t,
-rL...ka-d7
{,',
. -: -i'
i-
l
r4lawtt','T'uY*---Z:'\\ hal:'t"rt )\r,
t'ri
i, Vt'
N*
\ , :t;t,Dtd tt\hlc \t uo ,
\o]li \.'t"f '
q,' i,illd*lft i;)lll;i ;'
\,|w.. .Jvr
,t.,t., 1
(fliird''
b t \';rltl'd.."
',Jr+ci
Project Application
Proiect Name:
Projecl Description:
Contact Person and Phone
Owner, Address and Phone:
Architect. Address and Phone:
Lesal Descriptio ^, r", /o I l l , r,."r
Commenls:
Design Review Board
APPROVAL
o^t"lZ
DISAPPROVALs -'o
'8/
1,t//tfuj-
o/y Ldr 7, zfftnre:fults 's{ g)74// Arta Z?ftS 'a' U Staft Approval
Vntt-, C-rX'Cru.t O ?'It"5l
r,rstDrlffrAr. tr lrn Z ssrd T/€ l€€ cU+rlcll
lul€ oF lc€ o..::€R 5-
'9]RiL-f 'FiLll16toI
BllllrE IODRESS
l,
2,
1z
Flsc_r:llT
Jsr noon
fro nlocr .
JFS FI']R
FASSSJT
Jsr rlor'/ro rlmn)ir RccR ---.-
PASS€NT
]sr rLccn
?o n-oor
)R' FLCGR
5
-t/eo1.s0
,B
l.m
xI.ffi =
x .2.50
x l,m
'x .50
Br.sttt t TolLEf.//
(crE Bqt.F PATHJ
EfiPA sllliG /Fdtl
rul_s^'ftr . tll/(s-c,',a oR TtBl
EASTI{, TOILE-IJ
Rcc,s (il'ltttc rco*s,
ErlRlcIF, oiil$s'
STr.DlOS, (/2 5
nicrars' //.
ptstr'usgs /l
-urrcRrEs . //
oER h,\shaJ
tcg l'AralliEs //
sAr.US
_,;;
;AQ, OO 2z
q,
5,
'6.
7.
8.
g.
J0. -'-'
' pA{nfNTS i:l -
.. t:lrr' l:
,t-a
3,
q.
t
9a
1.
x
x It;
.50 '=
l.F =
0F POlr:TS
llx
p
m
cttts I
TUTAI.
' 10.m
.TOTN.
rcINTS
polms =
ul
/tt
trisPECroR
I .....
tdrcl{tr:G ]'ts cc}?LETtcil-9i^Pi:T::t:1,",?:'t !"tsfsi:'t[=t,"tt:nt3l ;si*lo(lcl{Ilig llt LL'i.'LEr,t\r.' .--..'--^ -^ CtTa;;uti: i}:il;fen ^
rirrsrur- ltlrl:tcllc{.9F.l*"'::;'i;.:,l"r.= rss, ,-.-,0 nnrurrc^in A fir/slcJL trt.'t'rurfufrlrr.iifr',..:,o'ia....;-l;i'isS, ,'-':D FiriE s:li-I'.,t:, ,s
fo nf rs:fss:l Act--rt::!1.;:5- .r..., ...,.. .r..:y ,rr^r,r,ttita'r.iirs:,,\:iy ltt n€ citlGl;:/,r-
).P"llF.i:':,t'"1'f;tiiliiii.-tt.illi ;1,,'t+;,:;i:';;'illl;I,.+j'"l,ilel'll;iti.ifilclo, tiiD l1r1 Dls;il1!] :tus r;r't' "" '"""""'t,i";;-iurL-ott.t o-'rLR'S li\ILR
ir,i"i&'l,iio.' nrts t;':aicttot slt'.r-L '"-5p !fltirll
ii'io soirn sLRVlcE ou\litiE'
nfit ll.lt':!,F$,, ^"^'' nr<rFr..r T"I
'.- /o,ao'- --Vao
;' 2.0o
4
/2_
?
{II
/
I-rir--
8b (w
I tut"f*
I
I
i 4",*q'
$l\It
$l Ild*uq.}{2+L+
I6l--
0/rh
L{/
ICDIS
P.O. BOX 1842
VAIL, COLORADO81658
303/47F088s
SUA$DIARIES
HERITAGE COI{TRACTO RS
G&GDEVELOPMENTCO.
INVESTMENT DESIGN INTERIOBS LTD.
DMG/bd
12903 COUNTRY RIDGE
sAN ANTON|O, TX.78216
514494-2195
CONSTRUCTION
INVESTMENTS
August 10, 19BZ
Mr. Peter Jamar
Town of VailBuilding DepartnentVail, Col-orado Bi 658
Dear Mr. Janar:
0n Thursday, July 29th, 1982, Mr. Jake Span of the Tree Farnin Fort Collins, Colorado, nade a bark inspectlon on all- trees(aspen & pine) planted on Potato Patch, l,ots !r10, & 11 andcertified that aLl" trees were indeed al-ive and growing. However,he did state that a number of the larger aspen trees had lost -their leaves, but this was due to late planting shock and wouldproduce new leaf growth next spring. A1I shrubs are al-so alive
and growing.
- Unde.r our agreenent with the Tree Farn, they act as oursupplier/rvholesaler for aLl- materj-als and r6eheck after plantingto see that al-l naterials were planted properl-y, i-f so, they warrantthe naterials for fungus growth or any inherent plant diseases.Therefore, frorn that point 1ve guarantee the pJ.anted materiafs fora period of one year. Thi-s guarantee is of course contingent uponthe rnateriaLs being properly cared for during the year, and theresponisbilj.ty may or nay not be either the home owner or thedeveloper based on the ownership of the property. Under the aboveterns, CDS trlnterprise, "warrants and guarantees all landscapi-ng andlandscaping naterials for Potato Patch, lots !, 10, & 1'l , Town ofVail, County of Eagle, State of Colorado. Thank you.
Sin ellr
o I
PLANN ING AND LNVI I{Oi.,]TiI]NTAI, COJ\,I]I.IISS I ON
Decerrtbcr f 4, 198l
pRtstNT
Scott Edwards
IVi" l 1 Trout
Gcrry White
D;rn Corc o ra.n
Duane Piper
J:ilr Morgan
ABSi]NT
Itoger tit kcmcier
The rnce t j.ng was cal 1c;d to order at. 3:00
following a work session on CC4 zoning
STAFII
Dictc Ryan
Petcr Pat ten
Pctcr: Jamrr
J 5,rr Sayre
lletsy llosol ack
p.n. by chair:nan, Gerry lthite,
and revi scd .R.ed L j on plans .
1. Approvnl of thc nrirrutes or" thc NoverrrJ;er 25
and Duane seconded to approve thc minut.c s was 5 - 0.,
I^jil.l rnovcd
r!*^-.:..^,r-ul l.ur LJt.\_rli5.
2. P.cqucst f or a {itno1- subdivision crf I ots l0 l1 and \2, Block l, Pot;li.oPatch. Appljcant: Cl)S [nterpriscs, lnc.
Pctcr Patten shorr'ed si.tc plans shorr'ing new I j.ncs with thc old property lincsin red. IIe explai,ncd why the staff rcconrnencled approval and Ken l{ilson rc.prcsentin5
1[6 property olrl)e]:s exPlaincd that a driveway cncroachmcnt on lgt ll ir'F.ts tobc cl.i.minatcd rr.ith tlie rcsubdi.vision,
Datl explaj.ned that no :rllowable GRFA c:h;rnges l{ou]d occur'. Dua.ne voiced colcern about1ot l ines lcgard.l.ng thc d j stance bctrr'r:el the bui-Ldi.ngs, !)ctcr assuaBed thr:irconoerns. Sc.ott nrovcd and h'ilI scco;rclccl t6 ;1ly1ytoved tirc f.i-qrrest for a ninorsubdivision. The vote r{a_s 5-0 in fat'c,r- v,ith Diln abstainj.lrg.
3. _L":qlq:!-.t-o-t*a _re_?gllllg gf lqtr I tlrr.ough 5, Cliffsjdc Subdivisiou from
Residcnti.al Clustcr: ilistrict to Singlc F':rmily I)i:itrj-ct. r\1,ip1J.canis: l{:CtraraBlot'n, Daryl R. Burr-s, David L, Cole, and Charlcs FI. Roscn<1uist.
Pt''tc-'r Pattcn explainod thc rneno showing -{-he site plsn and iliscussed the !lri: tihsin the ntcttro, Phil Orchray cxplained that he ancl Davc S;nclttana each hacl a. cor)tritctto l)tly a lot if thc zonirrg rvas ci:algcrcl , and that. the1, h'c1:s instrurrorrtal jn
rcrittesting 1.ltc rczon iull . .Jini recal lccl that trhctr this sui.l.'i-ivision uas ;l.tritcxcd
and zotrecj liesidcntia I Clustcr it rvlr-s thc lntcntion to t'cL:onsicler thc zonj-ng
at. ir Iatcr: datc. llc rv:is in fa.vor of thc chan.qc. l)an stiltcd that hc fcltthltt 1ot 6 s;hould be irtclr-rdecl . Or-drt'ay c-.lirJ iLinrrd tirat llo:;t:rr<1rii,st (orr'ncr oflot (r) h'as .in favor of ch:rngi.ng his I ot to dr,rpl.trx (prcscrrt li' he coulcl bir. l rla Po.;si.blc .i) or: P/S. 0t'dw;r.y statc(t that hc djclnrt irlvc t_ inrc to :;tudy thc
a I t r"rr:rtal: irrc s j.n ftri I :rrrtl so rlccjdcd lloi- to .inclurlr: lof (;.lrt. thc 1lr-.;t rrrilpti.,;rr[,,1.itr11 .i.)tr
Ilcrscn<Lrrist told h.irir th:lt irc (l{o-sq11q111 :jtr_) Noul(l rrot jrr:: i:rt ()l) L)lrilclitr.rg :i r:n.i lls. -'
0r'<lrrrrl' l.;'ol)t ()tI to.:rfittc Lllilt. hc did not. fccl th:rt thj.s riri:; r;|ot zorr.iiili i.or lot (r
s irrt:g j.1 h'il s ;lrl i:tc(:llt to liC- zoninq.
1981.
I nr,,r -.2- tz/14/Br
Scott agrecd with Ordrviry a.ddin,g that lot 6 wirs so cliffelcnt, there was no
neeri to considcr it with thc othcr lots. Scott addcd that hc was concer:rrcd
that the houscs not bc built hig,h on tJrc ridgc and wondcrcd if a tradc-ol f
coulcl be madc i.n this respcct. Ordway assurcd Scott that the houses woulcl
be dotrn thr: hill far cnough so that thcy wouldnrt interf.erc wit6 ot6crs' viervs.Ordway addcd that sit j.ng was the main rcason for tne requcst. Jirn voiced
concern over the vj.-sual impac-t, al so, thcn sai.d he was sure DRB would takethat into consideration.
Will moved and Duane -seconded to rezone lots
voi:e was 6-0, unanirnous.
1 thru 5 to Single Family. The
Dan voiced iris concern that tire home orrrrers show conccr:n irs to horv hi-gh theybuild, because the olners of the Ridge wc're purposely not building on the
high point. Gerry felt this was the co::rect zoling because dtherwise the
owners would be coming in with a series of requests for variances since the
RC zone in this.devclopnent made it virtually unbuildable.
Pt:elitinary- Review Sessj.on for Exterior Altclatiols and triodificatj-ons.
This sbssion was to cleci<Ie whether or not the subnritted projects would
be consi.dered rnajor--requiring a 90 day study, or ninor:--rcquiring a 60 day
study .
A11 of the following were considered to be najor rcvisions:
Gallery Building
Slifer Building
Lodge at Vail - Ha::ryrs Bar (new location)
Red Lion Inn -Deck Enclosure
The nreeting was adjourned at 5:30 p,n.
ME!4ORANDI,JM
TO: Planning and Environnental Conmission
FROM: DePartment of Conmunity Developnent,/Peter Patten
DATE: Decenber 9, 1981
suBJECT: Minor subdi.vision request for lots 10, 11, and 12, vail Potato
Patch Subdivision. Applicants: Dan M. Gagliardo, Marjory E'
Saunders, Laurence K. Hester
BACKGROUND
The two duplexes on lots 10 and 11 were constructed as a unified project
by a singl- owner and contractor. The lot line between lots l0 and 11 was
not abandoned because it would have made one large lot allowing only two
mits.
The problen is that there are two significant setback vj-olations existing.
Qne is on the southeast corner of the lot 10 duplex (7.6 feet frorn the corunon
property line) and on the southeast corner of the northelly unit of the
drlplex on lot LL (I2.4 feet fron the ploperty line conmon to lots 1l and
12).
THE REQUEST
Thus, this request is to change lot lines corunon to lots 10 and 11, as well
as lots 11 and 12 so that the new lots have no setback violations. Also,
. the new lots created have the same square footage as the existing lots,
so no changes in al1olab1e GRFA would occur.
RECOMIvIENDATION
The Department of Conrmunity Developnent recornmends approval of this ninor
subdivision request. The existing setback violations have no negative impacts
associated rvith then. The distance bettr'ecn the houses on lots 11 and 12
is 38.5 feet, well ovcr the requiled 30 feet, The other infri-ngenlcnt on
lot 10 is insignifi.cant becausc the cot:ncr of the house is only a couPLe
of fect fron the drivcrvay pavenent, fhis is thc lot line that actually
is mcaningless as it separates what is basi.cally orte 4-unit project. Also,
the owner of lot 12 has no problents with the rcqucst. Due to these reasons,
we have no problems with recommendirlg nPproval .
P.O. BOX 1842
vArL, coLoRADO 81658
303/476-088s
suEstDlARlEs
HERITAGE CONTRACTORS
G&GDEVELOPIIENTCO.
INVESTMENT DESIGN INTERIORS LTD.
Mr. Peter Patten
Torm !1annlng
Town of Va11
ValI , Colorado
Dear leterr
Dt'lC/bd
12903 COUNTRY RIDGE
sAN ANTONIO, TX.78216
51214*2195
CONSTBUCTION
rNvEsT Er{TS
Ilovenber I? | I98L
8Er lotato ialch # 10 & 11
llease pass our rnlnor subdlvlslon hearlng to the flrst PEC neetlng in Decenber.
The elgned coples of the nlnor subdlvlslon plat and easenents have not been
returned to thls offlce as yet. I w111 follow uP on these and get then to you as
soon a.6 posstble. Thank you for your asslstance and cooPel@tlon.
Slfrely,
4,h.-
Dan I'1. Gagllardo
//**[
t,/,/s/ry
')
) o^r"..121&t-:-t-l
orff,
ApplicantIs Rcp re s enta t j n "-=D&- -1n!-!4 3 9:---
b.: ra trLl2-
'/ttltfiPhone
L L (. c' L i' fur.l/./.,{7t - fiJ7
APP L IcAr I 0fjgrUl-ry1-A-9$!-ry!s-l9I-Lt:aui'U
r 5Cr!A.Narne of
Addres s
Appl icant
$.'*t34z ()u /.Ll 7L
B.Nane of
Address
Authori,zation of
S ign ature
Acldrcss -B rt
.(.d
D.Propc s aI
Block I Filing
r"l E.
,of'tf)/
Fee $i00
Type of Subdivision: (check one)
lr{ajor (involr'ing more than 4lots)
G.
LI
I.
I'linor (involving 4 or feler lots)
Duplex (splitting a duplcx struct'ure arrd'/ol lot)
Proce,Jures for rnajor and minor subciivision-s al'e as clcf inecl i t-he Torvn of \jail
Subdivision ltegrt).atior-rs on pages 9 through 20'
Duplex subclivi sion. requires
_
thc sane inf or:mation as a triinor srrbdiv j s i.on with
-
thc
reouircnent t-hat tl.tc following statemellt nllLst appeal. on the plat befort) )'ocLrlvlllg
Town of Vai- l aPProval:
For zoning ol othcr land-ltse regulltions of the 'fol'rt of
create<J by this subdivision arc dcented to be otrc lot'
residence' shall be allowed on thc conbinecl arens of thc
GrossRcsiclcntialFloorArea(Glli:A)for'1-hcttr'o-l'anily
calculated using the combinecl arca of tllc two part"cls'
Tinc Ilecluir-clnents: Ir'la j or ancl mi.or subdivi:;i.ons nltr:;L be lpproved by 1hc i'irttlti ttill
an4 Ln'ironrncrtsl Cornmission. 'fhe l)uC tt""i.
-"tt-aric
2ncL anil' 4th I'tond.1's irl' criclt
month. An appl ic:rLion rr,ith thc ncccssor-t ac'.coltii:ttif il.tg ntirtcl'ial nu51 l)c sttblnit!r''d
four (4) rueci.s prior- to thc dltc of thc lneetlnS''
Vai.1 , the t l{o l)lrccl s
No ntore tltlt tt olir-t t lio - I ilxli i \
th'o Parcel s. Al I ol{ll)I c
lcs iclence slurl I bc
C 0s Cn,(c e
f'tL rY Phone
J,
loot
Pr8o
310
srt I r..l- h.- Wn - .....Johoor!t. lhttri+r.
l'd| Oc t otrer
..o...4r ft {:b.a -a
-a
l-d b t}bl L Lt
ot rt. abr.d colora(lo J$. ttna F( d
Laa.l|.t l:(' r' i.' rri)",,
l.tl| l'. (.oujr \'
laadr-r}os En rrr I lr(1
rr80 ,lrr cgtENsKt . INe.
CDg' titI"DRPRISES ' IN(' . , a Texas L-'-:r t)clr,r t r')n
P.O. lox 1842. \'ail. c{) 81657
Snlt !,tdtffilrli/ ru
OCT 6 i980
s itj (a.)(a)
It
Coloradu
ttlI-]l lt a L da Fr' ( lll^lldr F. tr .!a lr;fl-rtio! d tL mlt ol
--..----rsN AND No,/ i o4- -'z+f c,af !=t$l!tt'19.-+*- -.--irtrar --.r;-,:gourr.,
bL-IFt.ro. tt.FtLba tiaL lg lrr y d !r' r"tl tri' ot "'dPr tl-td lr bD
b.-.d a-.rl.tql f$ fnrn( frfrf4 d .|l arrrr{.- It h. tr-r. d.l| arst b
.l bb ol
tl
ti
flrrf,rrrrrdrr-r*{- rL Ft "'
ol |l. .d F.( ]: s Lil.. rnd .darr t*
-,
.[ d f. d..la a...rd loG c F...1s d b!d. ttaa., ttl{l .1 Lba ir u'
C.rl .a Eaq Ie ra tt b d C.L* t tlrr
Lols i'. I I an(l I l, Bl,).:h l, l'<rt"rt" t'.r* '
tOClfD tl r! -a lJ.t tl. L.ahn ..d rPpqn.|r|G- tb.Funt b.loqlDl. or i' rlttt
att,dta3, aa - F-tar - FirLr rrbdaq rob, [.u- .|rd P.otil.r ib..ot rnd .u tlF "t!.1.,
tfaff I+ l,Er ab .|. a- rLtr.{t d 6. rid tryt' o! !h. ti..( Drlr .ltt t m ht "t .drt,ol. b
ra b $. rbtr f{*a t- '|tl t| f.!qhr-L.nd |,tirntt lr.r
ttO lAlI /fXD llD lll, lr I t d..r -rr ltrdnd vn &..rtb.d. \nth tL rPpur'r'h'ic" un:" il'
-fa 9-t y d t r'-a Fi i t :3 yrr .rYl ..itt|| t.r"Y.? a'd iL -ld
pant ol th. tiltl p.n, {b? lt-ll
.od iar .|r<r-('r. aA ct!-aal. ltEl. Lar||h. aail r3r- to rnd rhh iI. r.|d p.n !'rl t}t. ,srd t r|'
rts bfri ad a*4 tLt |t O! {a. ot tL c-tra .id d.llnrt ol tL.. t Qt lt l. tr,ll
.-.d d tt F-f- rbr. ctd, r .. r fod. rrrr, pcrtcq rb-lut" ara indo'..airl. r\.1.i. .f lrl .rlLh... rh
br. ra ir iadf rl Ldf tta ttl {r|| Frd Ltf{l .u6odt} to !r.!q b.rtd!" .. . c@rq .L --
b b.! r ard torr arir..da ra fld ll. r|.a |!a tr! rod clrr frcn all tctrr.r .td otbrr :rrnt , b.rr.l|l.
-1... t-., b-,.n-t aaa b.rln H I rlftrt \thd 6 nrttrt -tltrr .'x( r rt1 ,.1 ,'rllril,'!,
rcatr:ctl()ns. ,.'.Venants an.l tJxes c: r/. '..I:i
.nd rrr. dF '. brrfrhd prrur.. ra lb. ,,|rx .. ,.r l,.r.*lr D*i,,'r. ot th. ..'4 t^ ',f tl. ..co, .l r'.'1
r t 5 hdtr trd.-t!r. {rh.l ri Rn.l.trtt Fr!,n . r P.t.{rbr :.-t i'D ' irmtrl 'r -k, r-rr.i lh' ' l'
"r eul 9rn rl"F.a, tlr -fd rartt ol-lh. ? ar Fn.hrli |nd rtl \I'AII'ANT .{\ll t l:l:r'!;ll ftrl'E\"
lN fnff53 tl8lf0l. TL rld D.r'rt ,! !i' ttr.r o.rt r.+ .rtt.-l '1. .!,t..rta
Pt dd.ir..Bd 1.'.,,t'".|rt ..r. lu.'' lr.r.!, t, .tr'r-1 .tl^' ,.1 ' s :l 'llltr rlcr rrfit-o
o...t c Eagle
i rr. a.-a Ft:
ootllt Do.
dl IIrI r*'.1.
r{ .Ar|orhalt|rd f.lurr b. I
l(nepp 1,. ..
Hunphrc.
GOtEilSXl, rt' .
It ld.,lrl .qrtr-,on nDr.i l _ I '_ J l
wti-r..ttt ntrr 'i rrJ "tt ., &r.
L {l t.|t ltt t-D-<rr..-.. h,..r. , ,.. ,,..r r.?a ra n! !r ,t i. rl-v, 11 r.-.d.
ii0.
A.
That according to bhe indices of thc counly Recordcr of Eaglecotorado, relarivc ro rhc roriovilq rili-;ril;;ii;' -' t
Lots l0 and ll, Block I, Vail/Potato Patch
County of Eagle, State of Colorado
The rccordcd ouncr of sai<l rea.l propcrty is:
CDS Enterprises, a Texas Corporation
Thr:re are no mortgages or Deeds of Trust whichsaid real property,- otner irrin itr"'idiioii,iili
B.Furport to
not applicable
TITLg
( rne tiabiliry of the is limited ,l,o the fee pairl for
I
company
P.o. Box 1842
vAtL, coLoRADO 81658
303/47S0885
SUBSIDIARIES
HEFITAGE COITTRACTORS
G & G DEVELOPIiIENT CO.
INVESTMEIttT DEs|GN tNTERIORS LTD.
12903 COUNTRY RIDGE
sAN ANTONIo, Tx.78216
51U494-2195
CONSTRUCNON
!NVESTi'ENTS
Novenber 30' 1981
Dlr. A. Peter Patten, Jr.
f'epartment of Connunlty Plannlng
Town of Yall
Dear I'lr. Patten r
Thls correspondence sha]l serve as an exp).anatton for the reguest of varl-
ances ln lot llnes on Lots 10, 11, 12, Block 1, Potato Fatch Subdlvlslonr Town
of Vall. Acconpa.nylng thts correspondence shall be tltle searches to verlfy
owners of Iots fOr-ff, and 12, " s,rr.r"y showlng exlstlng lot slzes, (whlch arc
ldenttal to the proposed) lot llnes as proposed and slgned coples of a su:rrcyt
wlth proposed lot 1Lnee, by the respectlve orners of Lots 10' 11' and 12.
Presently two eet-back vlolatlons exlst on Lots 10 and 11 and the cxlstlng
drlveway on Lot 12 encroaches upon I,ot 11. Wlthout changlng the slzc of the
lots and rlth the full consent of all respectlve owners ue Propose to the ctaff
and Plannlng and Drvlronental Comrnlsslon to alter exlstlng 1ot llnes to nect
present ordlnanccs of the Town of Vall.
One set-back vlolatlon occurs on the southeast corner (south unlt) of the
stnrcture located on Lot 10. It ls ?.6 feet fronr the 1ot Ilne betreen 10 and
11. Orlglnally thls lot l1ne ras to be vacated, but thls rould have created a
latge duplex lot wlth four unlts. After nuch thought, lt was declded to create
an easenent lnetead of vacating the llne. The vlolatlon occu:red (pourlng of
the foundatlon) before thls was decl.deC. The proposed change ln lot llnes r11l
clearly erase the vlolatlon witbout cl;anglng the slze of elther lot.
The other set-back vlolatlon occurs on the southeast corner of the etructure
Iocated on Lot 11 , (north unlt). The foundatlon slts 12,4 feet fron thc lot llne
of 11 and 12. The proposal for correctlng thle vlolatlon la bcst shown by the
acconpanlng plat nap. An even t::ade cf land as proposed between Lots 11 and 12
whlch w111 cor-ect the vlolatlon on Lct 11 and the cxtstlng encroachnent of the
drlveway on Lot 12 onto Lot 11. Thls i-s done agaln wlth no change ln lot slzc.
It should also be noteil that the exls'i.lng structures on Iots 11 and 12 have
thlrty or nore fect betxeen then at ti,elr closest polnts.
P.O. BOX 1842
vAn-, coLoRADO 81658
303/47G0885
SUBSIDIARIES
H ERITAGE COI,ITRACTOFS
G&GOEVELOPME]TTCO.
INVESTMENT OESIGN INTEFIORS LTO.
12903 COUNTRY RIDGE
sAN ANTONIO, TX.78216
5121494-2195
I{e hope thls correspondence clarlfles
vlolatlons and rneets nlth approval of the
Envlronental Conmlsslon. Should there be
contact rne at 4?6-088J or 476-0937. Your
greatly appreclated.
DMG/bd
our lntentlons on correctlng exlstlng
Town Plannlng Staff and Plannlng and
any questlons Please feel free to
cooperatlon ln thls natter wtll be
$n""""ly,
d^4 At- ;-
Dan 11. \c"et$rdo
CONSTRUCTION
INVESTMENTS
Page 2
box 100
vail, colorado 81657
(303) 476-5613
department of community development
December 3, 1981
Dan Gagl iardo
CDS Enterprises
Box 1842
Vajl, Colorado 81658
Dear'Dan:
At thejr meeting of December 2, 1981 the Town of Vail Design
Review Board apiroved your submittal for bui'lding., sjte and
tinaicaping revisions from the origina'l plan which was approved
by the Board on November 19, 1980.
Specifically, the Design Review Board approved the revi.sed ridge
uhO tlub elivations ol the two dup'lexes and the revised 'landscape
plan submitted on December 2, 19Bl . The revised landscape p] an
includes the retaining walls which have been installed.
The Board's approval of the above mentioned items included several
conditjons which must be presented to the Community Development
D;il"til;t iot app.oval aird must be completed prior to any final
Cei-iilcate of 0clupancy issued for the buildjngs. The conditions
are as fol'l ows:
1) The boulders along the south side of the driveway must
be redistributed to ireate a less formal arrangement' This
redjstributjon should jnclude eljminating boulders to enable
Jesignated p1 ant materjals in that area to be planted,
partially burying boulders, and grouping boulders together
rather than forming them in a row;
2) The existing as[en on the south sjde of the property which
are not living-must be replaced with 3" caliper aspen with
additional groupings of lL"-2u ca1 iper aspen;
3) Screening with plant rnaterials should be provided to the
south of the hot tub area;
4) The area to the rear corner of unit 11B must be regraded
to a 2:1 slope;
5) Additjonai evergreens (3 minimum) 8'-l'0' in height must
be placed to the east of unit 11;
6) ilegrade the area west of the retaining wa11s adiacent
Page 2
to Lot 9 to match the existing grade on Lot 9 prior
to construction;
7) The planter boxes and timber walls must be stained
dark brown;
8) The exposed foundatjon walls must be sided with siding
to match the existing siding;
9) The planter boxes in front of retaining wal]s will be
p'lanted at owner's discretion;
i0) Regrade the area to the south of the retaining wall
on the south of the property to resolve undermining problem
whjch curently exi sts;
11) Replant Lot 9 with vegetation as agreed to by the owner
of Lot 9, Mr. Bob Fritch. The plan for this revegation must
be submitted for my review prior to planting. The Design
Review Board has ccrnmented that the revegation shown for
Lot 9 on the landscape plan submitted December 2' l98L would
be adequate.
It is understood that the applicant is agreeable to these conditions
of the approval and that a revised plan including these revisions
wfll be submitted to the Town Staff as soon as possible. Upon
receipt and approval of this plan the appl'i cant will then be able
to proceed with building inspections (pending approval of the
setback variance needed from the Planning Commission) and the right
to request a temporary Certificate of 0ccupancy. It is also understood
that on or before July 1, 1981 the Town of Vail will jnspect the
property for compliance with the approved landscape plan... Fajlure
to pass this inspectjon will constitute grounds for revoking any
temporary Certific te of Occupancy which has been issued.
Please respond and confirm th'i s agreement as soon as possible. If
you have any quest'ions, please do not hesitate to contact me. A
iopy of the-landscape pl an subm'i tted to the Design Revjew Board with
thejr notations is attached for your reference.
Si
Peter Jamar
Town Pl anner
PJ:df
EncI .
V,
/
I
IJ-l
I
fz'4
10.
Al,l
0L,
Jv
,-I
tT"
,- 1t-...V,.*- b-y'
.,t1,,)
\ . rd,i;,wt'F i,,.,;;;-J-i*T-o_-'
? ,}l",J,Tffi[, i"";'''li'rr"q^- -";r;*: it::;'--"$\\
i,' ),,u,,a'q* i t:,;;tliY^t
..,., f;v r'i\#
,-.,,l'll,';f\,'S. i;.i'"i^\ 6 I i,;l^na '
,94
'l
?..
I
box lfi!
vail, colorado 81657
1303' 476-s613
November 30, 1981
Dan Gagliardo
CDS Enterprises
Box 1842
Vail, Colorado 81657
Si ncerely,
department of community development
RE: Lots 10 & 11, Potato Patch
Dear Dan:
}Je have received and renewed your request for cont'inuation of
several items for the above referenced duplexes. lr'le will lift
the stop work order for al'l items 1-5 in your letter of November
19, 1981. It is understood that these items are al'l interior and
that no work will be completed on the exterior of the bui'ldings.
All work completed is at the own.r's risk and it must be understood
that this letter represents no approval of any work done on lots
10 & 11, Potato Patch and that fina't approvals by the Design Review
Board and Planning and Environmenta'l Commission are still pending.
-aUI
Peter Jamar
Town Pl anner
PJ:df
P.O. BOX 1842
vArL, coLoRADO 816s8
303/47&0885
SUBSIDIABIES
HERITAGE CONTRACTORS
G&GDEVELOP'IIENTCO.
INVESTMENT DESIGN INTERIORS LTD.
12903 COUNTRY RIDGE
sAN ANTON|O, TX.78216
512t49+2195
CONSTBUCTION
INVESTMENTS
Novcaber L9, t98I
!,1r. Peter Janar
M!. A. Peter Patten, Jr.
Dept. of Connuntty Dcvelopnent
Town of Vall
Dear Slrs,
Thls corespondcnce shall serve aa a request for contlnuatlon of all
lnterlor work necessary for conplctlon of the duplcxes locatcd on Lots 10
and 11, Block 1, Potato Patch Subdlvlslon. It ls r.urdcrstood and agrced,
that all rork perforned under this request ls done so at the rtsk of thc
developer and wlth the fu1l knowledge of the Toxn of Vall- Bulldlng Depart-ncnt, It ls furthcr understood by the developer, that ftnal approvals by
thc Deslgn Revlew Board and Plannlng and Envlronnental Connlsston have not
becn granted as of the date of thl-s lctter and are curren'Lly under consld-
c::atlon by thesc boards.
llork nccessary for conpletlon ls outllned belowr
1. InstaLlatlon of all electrlcal flxtfres ancl appltances.
2. Installatlon of tlle and carpetlng.
J. Appllcatlon of palnt, drywall texture, or rallpa.per.4. lnstollatlon of plunblng and heatlng.
5. Mlnor carpentry Jobs (nostly punch-llst type ltens).
Your cooperatlon would be greatly apprcclated.
nuc/bd
011ll| B
I
box 100
rail, colorado 81657
(3{r3l 47S5613
department of community development
November 23, 1981
Dan Gagliardo
Box 1842Vail, Colorado 81657 RE: DRB Subrnlttal of 11-18-81
Dear Dan:
At the November 18 meeting of the Design Review Board, your
submitta'l for building material and site alterations on lots
10 & 11, Potato Patch,was approved with the fo'llowjng Stipu]ations:
approval of window changes and native stone on chimneys, examine grade
changes, clarify locations of retaining wal1s. All other.i.tems
tabled until next meeting.
$incerely, A4(k
Peter Jamar
Town Planner
PJ: df
!t
Owner, Address and Phone:
Architect, Address and Phone:
Legal Descripti on: tot!-l-Q 3 J-I
Comments:
Design Review Board
Motion by:
Seconded by:
APPROVAL DISAPPROVAL
--o
Su m mary:
/oT t)ft, tD a6-s a\^/
Slaff Approval
ICDS
P.O. BOX 1842
vAtL, coLoRADO 81658
36/47e0885
SUBSIDIARIES
HERITAGE CONTRASTORS
G&GDEVELOPMENTCO.
INVESTIIENT DESIGN IiTTEFIORS LTD.
1.
0a'o
1t)taF'
Dater 11-13-81
Tor Peter Janar, Town of Vatl
Fbonr CDS Dnterprlses, Inc.
Subjectr DRB lieetlng, 11-18-81 , potato palch # 10 & 11
Drl-veway rebullt to IV" grade and heated as per 8111 Andrews recornroendatlons.
Rldge elevatlonsr
Unlt 10A - 2,2 feel hlgher
Unlt 108 - 0.9 feet lower
Unlt 11A - 4.1 feet htgher
Unlt 118 - 0.5 feet lower
Both I'ots back up to 3lM Land and nelther stnrctures causes any obstnrctlon of
vlews from adjolning l"ots as the vlews are all due south, T nol to elther slde.
f3. Chlmney nraterial - 1s being changed to natlve stone y/-
4, Iandscaplagr*
A. See landscape plan
ts. South bank cut down to neet contours on ner landscape plans.
C. Addltlonal tfurber wa11s on west of unlt 10A and to the east of 11A have
been cut dom to neet naxirnun helght requlrenents.
D. Addltlonal waLL on north slde added for extrca retatnage because of eteep-
ness of slope.
E. Planter box has been added 1n front of Lower north wal1 wlth J.andscaplngln orrler that wal"l does not exceed maxlnun height.
5, Set backsr
A, Easenent belng granted between lots 11 and 12 by owners of each to meet
set back requlrenents.3. Easements belng granted beiw€en lots 1O and 11 by owners of each io neet
c. ffi3"m;t ffa$:38$"t3ui," h*"d at, LL-23-8r pEC rneeting.
6. Addltional wlndows (2) aAaea to llvlnq roon unlt of unlts 108 and 113 for addedvlews of Ve.ll nountilil. See plan.
12903 COUNTRY RIDGE
SAN ANTONIO, TX.78216
512149+2195
CONSTFUCNO
INVESTMENTS
.v>
box lfl}
vail, colorado 81657
(303) 4765613
Lots 10 & 1l Potato Patch
1. Driveway at 10% originally at 8%
2. Slab & Ridge Elevations
Unit l0A
department of community dwelopment
Actual Slab Elev.
Plan S'lab Elev.
Di fference
Actual Roof Elev.
Plan Roof Elev.
Difference
Unit 108
Actual Slab Elev.
Plan Slab Elev.
Di fference
Actual Roof Elev.
P'lan Roof Elev.
Di fference
Unit 11A
Actua'l S'l ab El ev .
P'lan Slab Elev.
Di fference
Actual Rool E'lev .
Plan Roof Elev.
Di fference
:8605.4
8602.4
+3.0
8631.1
8628.9
+2.2
8615. r
8616.0
-0.9
8637.6
8638.5
-0.9
8506.5
8603.4
+3.1
8634.0
8629.9
+4.1
Page 2
Unit 118
Actual Slab Elev.
Plan Slab EIev.
Di fference
Actual Roof E'lev.
Pl an Sl ab E'lev .
Difference
Setbacks
--L2.4 feet on east
--Line between 10 &
6. hjindov Chanqes
Unit 11A
must be vacated
Chimney Material - was to be native stonel is stone veneer
Landscapi ng
--areas of trees designated to be saved on north and west
destroyed
--bank to south steeper than originally shown
Retaining l.lalls
--additiona'l timber wal'ls on west of unit 10A & to the east
of 1lA, height of both walls exceeds maximum height of 6'
--Additiona'l wall on north side of units
--lower wal 'l on north of property exceeds maximum height by
2.z'.
8615.5
8617 .0
-0.5
8639.1
8639 .6
-0.5
3.
4.
5.
of
11
o
z0NE cHrcK
sFR, .R,
bt / 0 nock,
for
P/S ZONE DISTRICTSR
Legal Description:
Otmer Architcct
Fi I ing
Zone District
Lot Area
Setbacks:
llaterccu rse-requ i red
GRFA:
GRFA:
Proposed Use
,_Hei ght Al I oued 3o; Proposed
Fron t -Requi ft d-20 t"-pi.oijis ea
Sides-Required'15' proposed
Rear -Required '15' Proposed
Proposed
Requ'ired
Propos e d
Proposcd
A'l'loned
Primarl, A'l I ovred rL6-O b Primrry Proposed 7 228
Proposed -3777 -
Secondary Allor.red - f 77e Secondary proposed
Site Coverage: A1loived
Landscaping :
Parlting: .Required
Drive: Slope permitted.
[nvi ro niiienta i /lla za rcls : Ava'l an che
Flood Plain
Sl ope
SJ.ope
Propr;: ed
Actual,
Connrents :
7tr:r InI : /rf iyt:.0r,,::1,/Di::\ri)l)l-.(r\,o(i D;1,: :
Project Application
Proiect Name: -1.
Project Description:
Contact Person and Phone
Owner, Address and Phone:
Architect, Address and Phone:
Legal Description: Lot Block Filing , Zone
-
Comments:
Design Review Board
Motion by:
,^," /,)/LrfF/
OTSAPPROVAL
Seconded by:
APPROVAL
Summary:
Town Pl
Date:
El statt Approval
box 100
vail, colorado 81657
(3031 476-5613
department of community development
October 26, 1981
Dan M. Gagliardo
Box 1842
Vail, Colorado 81658
Re: nt{} and ll, Potato Patch-
resilfftion of work
Dear Dan,
l,{e have received and reviewed your request for continuation of several
work itens for the above referenced duplexes. The planning staff will
lift the stop work order for a1l iterns in the letter excePt for land-
scaping work. we feel that you should appear before the Design Review
Board for their recomnendations on the landscaping work before you
resume your work on that aspect.
Jhus, Iet this letter serve .as an approval to work on..,itens 1 through
5 on your letter of October 22, I98L, with the sti-pulation that all
work is at the developerts risk and that this letter rePresents no approval
of any work done on the lots,
A. PETER PATTEN,
Senior Planner
APP:bpr
lir. Ieter la tton
Tonn of ValI
Val1 , Colorado
lear leterr
October 22t I98:.
REr Lots 10 and 11 , Potato latch resunatlon of work.
lle understand and agree that all work performed under thls request, as
outllned belor, ls done so at the rlsk of the developet and with the fu1l
knowledge that flnal approvals must be forthconlng frorn the Torm of Vall
Eulldlng iepartrnent.
1. frlveway - to neet code as per 8111 Andrews recomendatlon.
2, Exterlor stone work - to rneet speclflcatlons.
3. Heating and Pl-umblng - to prevent damage to structure.
4. Extertor hardware - to secure bulldlngs.
5. N,ecessary t11; - ln order to cornplete plumblng.
6. Crlb ralls and planter boxes - to neet staff recorunendatlons.
?. Iandsca-pe - to be started and cornpleted as weather pernlts.
Thank you for your cooperatlon and asslstance.
IYG/ce
. 'EAaLZ UX-t* eNetNEERlNe IGURVEYINq
'NC.po. @x lolS vAlL 661-6ftADO 01657 303,176-4073
October 19, 1981
Mr. Dan Gagliardo
C.D. S. Enterprises
P.O. Box 1842
Vail , C0 8f658
RE: Lots l0 and 11, Block 1, Vail/Potato Patch
Dear Mr. Gagliardo:
Per your instructions, we have established elevations on the floor
slabs and roof ridge li.nes for units 10A, 108, 11A, and 118 locaEed
on the above 1ots. The elevati-ons are based on Vail Water and
Sanitation Districtrs as-built elevations on manhole 224. Below is a
surmary of the elevations requested.
unir /i- 10A:3
108- f/
11A-5
118- 'v
Floor Slab Roof Ridge
8631.1
8637.6
8634 .0
8639 .1
8605.4
8615.1
8606.5
8616.5
The balance of the information you requested is shown on our dr awing ll492
dated 10/19/81. If you have any further needs or questions on Ehis
project, please contact me.
Yours tru1y,
EAGLE VAILEY ENG]NEERING & SURVEYING, INC.
Dan Corcoran, L. S.
President
DC/jc
i"r HPPHFHOO ,tdtttHrrrrFS
A A2VtZ'rt\-- \./ \-/ \-,
IE
co 6 0 -HO\O\O\O\FHOtsO.lO\ O\ \rt \rl fiAL il;., blE
b
IE
@ ur @ -lgI $ .a pF
o 5 o FIE
E
IE
i $.r $lE\^P\OOIC)
16
E
t>
Eo 6 cD ol>$.$ S'SlF\O .F \) F, l!'r- b 'o.. 'r- 18F
IE
IE
@ @ o -E$ s s $t\o \o 6 @lo?" b t GH
E
Ei .s + $E\I J-t \O tF
E
,H H
g
F<
trr *9H'Be gBNFrF.rJ d L -N@€oo\N o >rrooooooo { o!r5
fttttttt
NNPFF' (ho\N co 50cAN o Hooooooo o poot+OtttttttPot-F,r pFi F., il o$*H*5SS 3 r-
R
.l
Origlnal survey for improvement survey submitted to Torrn of Vail shorts:
1. Party wall running through the niddle of uoits 10 A and 11 A
rather than where the party wa11 1s actual-1y located.
2. Set back or west side of unlt 10 to be 15r+.
3. Set back on East elde of Unlt 11 to be 15t*.
4. Each engineering flrm used different reference polnts.
5. Does not show dralnage eaaenents.
6. Back wa1l of Unit l-0 was shonn as 49.8. Eagle Valley
Eogineering shons 50.8.
7. Iilhlch survey do we use??
ero;ect ttame' f)Fi
C Project Apptication
'')
E v I L-o, A b v^{i*;,al ALS
conracr person and ,n"^" C, A.1 , €-ttrfE?e c-,€q
owner, Address and Phone: e',0'< '{+ftqP?"-j\'}
(A.iD'Pc.rr l
Proiect Description:
Architect, Address and Phone:
Legal Description:Filing Zone
-
Com ments:
Design Review Board
Motion by:
Seconded oy:
APPROVAL DISAPPROVAL
Summary:
Stalf Approval
dtrua;
/ a+zal./v
Potato Patct-r - 10 & 11
Site Inspection - 6/29/8L
Appears to be fill on Lot 9 to west -- trees indicated as remaining
on S.W. Portion of lot destroyed
2 extra retaining walls to rear
One duplex redwood -- one cedar redwood approved at DRB
Extra retaining on east & west of duplexes
Aspen trees removed on S.W. portjon of lot
Flues on fireplaces are siding instead of rock
Project Application
projectDescrip,,"", cr[ANaE /N Tetna Cot-qR
Project Name:
Contact Person and Phone
Owner, Address and Phone:
Architect, Address and Phone:
, --..] | tLegal Description: Lot l[-/z Il , Atocx
Com ments:
,r n (oTnro ?xTe* , zon"
-
Design Review Board
Date
Motion by:
Seconded by:
APPROVAL DISAPPROVAL
summary: 'c(f ',r4- Oe l(tvu (tlcf- c ar+NUe. k3
4.7 St.o
.* .a+."
.;
.tit*-'{:,.tt*
Bronze Stone
o
MANUFACTURER
a
About
$tucco $tone
Products, Inc.
Stucco Stone Products, lnc. of Napa,
Califomia has been rnanufacturing 'stone
r,reneers for 17 years. We are known for pro-
ducing a consistently high qualilg producl,
We do not franchise our manufacturing pro-
cess so thai w€ may maintain absolute guality
control. We are the only manufacturer in the'slone'
veneer indust4r offering a lifet:tE writen war-
mntg, Stucco Stone Pfoducts, lnc. has retail out.
lets in every state of the 0.S., every province of
Canada and sereml crther foreign counbies. Our
manufactureis representatives are on call-
in percon-in all these areas, Questions or
problems also may be presented directly to
the marketing department at our
home office in Califomia.
You rnay call collect:
0O7't 255'1727.
Reoular Driftstone
Cover Photo: Owners, Designers r'Mr e Mrs. Ken Billington Photographer // T.R.
^4)4es
This brochure is copyrighted jn its entirefy. June, I979.
D $ilcfrh uEilEEm
4.7 St.
REGOTAR
DRTFTSTONE
Note the realistic
appearance obtained
by the use of right angle
comer pieces. Match-
ing hearth pieces are
specially designed
to suppon
seating etc.
l"rl
About Cultured
ttone Veneer@
Cultured Stone Veneero and
StuccO-Stoneo are brand names
registered with tlre U.S. Patent Office.
The product is manufactured stone, prduced
from Portjand cernent, pumice and mineral ox-
ide colors. Each lightweight piece is cast from
an individual mold taken from a nanrral stone
-thereby guamnteeing rcalistic stone tex'
ture, Hundredg of molds are used to essentially
eliminate repetition.
Cultured Stone Veneero is economically
applied over any structurally sound wall
with ordinary mortar. lt is colorfast and
may be used on interiors or exteriors
in any climate. Building Code
approvals and technical
considerations are
listed on page 11
of this brochure.
COBBLERELD@
Rectangular shapes,
earthtone colors.
Regular Driftstone
tulfl
0)l(
|rllf STOfrEUENEEM
[ava
4.7 SL
Apache Bronze
Flintstone
5
Moss Rock
'/
/_tu'.,i9*
.GilF
ri/€4
r/l 0 4.7 St.
CULTURED STONE VENEER@ is noncombustible.
However. its use to reduce clearance from a com-
bustible-such as behind freestanding stoves-
must be in accordance with local buildino codes.
About
Substitute Products
It is illegal to use this brochure
to sell any other producl lf pu beliera you
have been supplied a substjtute 'stone',
please call our marketing
department collect
at (707, 255-172?.
COLTURED STONE VENEERo is essentially
impervious to severe freeze/thaw conditions. It may
be used in anv climate.
USES, APPUCATIONS
PAI.O VERDE
wr'th nndom headr u*d as
a paver shown at right Random
h@r0l h also a€itabl€ !n
Regular Driftsione color.
About
$ohing Problems
Cultured Stone Veneero solrres
rrrny problems encounlered when
build.ing with heary natural stone. Be
cause it is nof heaqy, (hss than I lbs. per
sq. ft) Culturcd Stone Veneero r€quires no
specbl foundations, fireplace linteb or wall
ties. Typically, its total applted cost is up to
5O% less than the total applied cort of
natural stone.
Cuhrured Ston€ Veneero may be
applied over wood, metal, wall-
board. brick concreG ot other
property PrePared surfaces.
COLTURED
STONE\iENEER@
may readily be used around
water. We recommend the
use of a nongloss masonry
sealer in such aoolications.
I
I
8
CULTURED STONE VENEER@ is lightweight-
less than 8 lbs. per sq. ft lt is ideal for use on
mobile homes. uDstairs fireolaces or other loca-
tions where extreme weioht must be avoided.
Regular Driftstone
Blond Driftstone
4.7 St.
Glacier@
About Colors
The photos of
Cultured Stone Veneer@ in this
brochure are as close to true colos
as printing makes possible. However,
you may wish to examine actual
samples before selecting
color,
Fl
Fl
0)l(
t|1l($TCITfrUEilEEm
ASSEMBLY. INSTALIATION
$ilOTE UEilEEM
Cultured stepping stones are engineered to withstand
foot traffic. STREAM STONES (left) and SEOUOIA
STONES@ (right) complement any landscape
desion.COLTURED BRICK VENEERO iS
a unique veneer-it really looks
like used brick.
Most tvoes of Cultured Stone Veneerri)
look better with colored mortar. The
WOOD
FRAME
MASONRY OR
CONCRETE WALL
BLOCX ORINY MASOIIBY
MOFIAR IS APPLI€D OIRECITY
PAIIIT€O
'ETAL
LATH
IILT UPOF POL]REO IN PLACE
CIJLIUREO STONE VEN€ER"
added cost is minor. Use brown mortar with
earth tone stones. Use \Lhite or grey with Claciefi:
or Palo Verde. Use black with k,,a. Ose arev with Flint.
About AppMng
CULTUFED STONE
VENEEB!
I
I
I
Cultured Stone Veneer@
On wood frame walls, rnetal sheeting or
wallboard. a wire-meshed scratch coat of Portland
cernent mortar is first applied. The Cultured Stone
Veneero is then applied-a piece at a time-with a
second, sefring coat of rrprtar.
lf the wall to be rreneered is of masonry, (brick
block cemert etc.) the wirc.meshed rratch
coat is not requked. Follow the accompany'
ing application dmwings or obtain our
detailed application insfuction sheet
from your supplier. A professional
contractor instmction booklet is
arnihble, as are architec'hrral
specification sheets.
TECHNICAL SUPPORT
5PE[S
RPFEffI
CULTORED STONE
VENEERo is designed to
signifnandy exceed trechnical
standards set out by code offichls,
So called "equivalent" or 'just like"
manufactured stone raeneers should
be aded to document comparable
standards before a professional
risks his reputation on such
"equivahnts" .
SHEAR (ADHESION) STRENCTH: The
rnost important attribute of any stone
\€neer producL Recent (late 1976) inde.
pendent laboratory tests prove Cultured
Stone Veneero to have a shear strength
in excess of 250 p.s.i. This resuh is 5
times that required by the Oniform Build.
ing Code.
THERMAL RESISTANCE (r): Early 1977
independent laboratory tests (Pittsburg
Testing Labs) reveal a .69 heat transfer
factor (r) at a denisty of 57.7 lbs. per
cubic foot. The insulative qualities (r) of
an average thlckness of Cultured Stone
Veneer@ are equal to /4 inchesoftypical
natural stone and nearly 6 inches of
common brick
WATER ABSORPIION: 15% in a 24 hour
immersion test.
COMPRESSIVE STRENCTHS: 1 400 p.s.i.
on flat veneers, 1400 plus p.s.i. on corner
pieces, 2000 p.s.i. on hearth producls.
FREEZE/THAW CHAMCTERISTICS:
Evidence from thousands of applications
in Alaska, the High Siena and the upper
Midwest suggests tiat Cultured Stone
Veneero is essentially impervious to
severe freeze/thaw conditions. In no ap-
plication has Cultured Stone Veneero
ever failed due !o freezinq.
4.7 St.
CODE ACCEPTABIUTY_CERTFICATTfI'I
rcBoA, Recommendatron
S/ro zrr:
Underwr ter s
6) Laboratories, Inc.
\ 7 CIass fication 209T.
ffi .o"o No.z7-24
s,'ra+, Southern Bu ild rn g
='r#: a^da a^ndrA<a:':-.-''''..,r;.;n' (Pend ng).
FHAi VA L4ater als Release
No. 69 1
Central N4 ortgage &
H ous ng Corporat ron
Acceptance No.7370.
City ol Los Ange es
Approva No. 23744.
Ll AITED WARRANTY: Stucco Stone Pro-
ducls, Inc. wanants that Cultured Stone
Veneer will endure for t}re life of the
structure to u/hich it is applied, provided
such application is made according to
manufacturer's specif ications. Please
write or telephone for a copy of the
complete wananty staternent.
EASLY VERIFIED: Cultued SbrE V€rEero
has no equivalent". You may be sure
you received what you paid for by check-
ing the edges of our veneer pieces. Each
piece canies a small "C.SV."o brand.
A closeup photo of the brand is shown .
below.
About
Substitute Products
It is illegal to use this brochure
to s€ll any oiher producL lf you believe you
have been supplied a substitute 's.tone',
please call our mar*eting
departnent collect
at QA7) 255-1727.
FIREPROOF: Tested and classified by
Underwriters Laboratories. Inc.. Culh.rred
Stone Veneero showed zero flame
spread, zero fuel contributed and zero
smoke developed. See UL Classification
nos. 209T or 305T. Also note photo
aDove.
WEICHT: Shipping weight approximatety
8 lbs. per sq. ft. at average thickness of
l7i inches. Dry weight approfmately 7
lbs. per sq. ft
COLOR FASTNESS: Colors are an inte.
gral part of the casting process. Empir-
ical evidence shows no undesirble
change in color after years of weathering.
REPETITION: Culh.rred Stone Veneero is
cast from hundreds of indiMdual molds
to obviate repetjtion.
PACMCINC: Culh-rred Stone Veneero is
alailable in color.coded boxes of two
sizes. The 90+ sq. fL box is handled by
forklift. The Handi Pak carton contains
11 .12 sq. ft. and weighs about 90 lbs.
OPERATION - MAINTENANCE
A non-gloss waterproof sealer should be
used on hearth applications and any ex-
terior applicaiion that touches the ground.
Use Thompson's Water Seal or Chem-
Stop Water Proofing when possible. To
clean mortar film from Cultured Stone
Veneer@ use l0 parts water to one part
murjabc acid. Use tri.sodium phosphate to
remove soot and smoke build-uo.
il
PRINTED IN {ISA
fCDS
P.O. BOX 1842
vAlL, coLoRADO 81658
303/47&0885
SUBSIDIARIES
CONSTRUCTION
INVESTMENTS
HEFITAGE CONTBACTORS
G & G OEVELOPMENT CO.
INVESTMENT OESIGN INTERIORS LTD.
July 5, 1981
changes requested
Val1 , Colorado.
l. r. ieter Jar.ar
:' u lli 1r.r -.eJra rtnent
?onr: of i'p 11
Vr 11, Col orr!o Ft('.5S
Lea, f i: e ter t
Thls Is our
by purcha ser
vt;,w I Ct
atlon of
Subdlvldlon,
LOT#10-UnltsA&B
1. Orlginal Spec,s - Cedar Sldlng on plans/Redwood on Specs. CedarSldlng a.s speclfied wlth Llnseed o11 clear sealer.
2. 0r1g1na1 spec's - native stone exterlor on flreplace flue boxesas speclfled - flue box to be ',Regular Drlft fioss Rock,'.
3, I'lest and Southr.rest slde of 1ot to be replanted nlth Aspen trees LZ,h6,to repLace trees thet were removed. hevlsed landscape plana to besu}mltted lf you so deslre. =-- /---\
\l.cr,:t-th:rrrrFI
I :. Crl6trul .l.c'. - Crirr g16114 oft
'l.nrA.drod
o.i rlroo}
\ e.drood tldtnj rlUr Cal olrr rrlrr.
\\l . ctt?tn l .Fort . btlw ftdra ort rtx 6 llrrrlror flrrCrtrtnrl .t{ort . lrtlw ftdra ort rtx 6 flrr$ror flrrrl'cclflrd . tllur lplrr to t'r 'lr6rlq3 irrltl, liora lroolr
t
I
3 COUNTRY RIDGE
qNTONtO, TX.78216
?4-2195
or vef
%*a:w1 \A{*t(c 1,1 ,
r,,^t,,J.q=gg
I l-'-',ll-J i[-.f lli] llil I I 4l :i i
NAllrr of ))lio,T1,;(:'l'
L)IGAL I)l::fiCltI l:'1'1', 0N
I)lilicllIIU'i Ol{ 01.' l))iO.l ):iC'f
,-LJ-t,u't-J---]TILING
'Jlh cr
to
A,)
l.r>l l.orv.i.ng .j tt1'c:t.'tnltt:i on
tlrc Dr:si1;n llt;v j.r:tv Iloard
DilI LDII'{G i{ATlill I AL,S :
Iloof
j.s t:ctlui lcd f ol s;ubnl.i. Ltll1. b1'
llcJl<.rrc lr final iLppt'ol'41 cnll
Iryixl-e-!*i14!9ri3 f
thc A1t1l1 j ciLtrt
bc giv<:n.
Co 1<>r:
Fascia
Soffits
IYindows
l[indow Tri-m
Doors
Door Trim
Iland or Deck Rails
Tlues
tr'lashings
Chimneys
Trash Enclosures
Grecnhouses
Other'
B.) PT.ANT n TTIRIALS(Vcgetativc, Landscap j-ng }latcrials
ancl Grouncl Cover)
Potanical irlanre Conirorr lintite
tt lo -cEW'Siciing 1gz.( tr +
Otlior l.lal l llater:j.a1s -fllcp - ?utt{
I
including Trees, Shrubs,
t, ees
dr. txrtpztpua
9s!-!-Ur+_-_7_-
.**l/A-
_28_
*JL
Size
---tfr-,D'
lud.Av>WJbrffi'{.,9u-
5-gt-
, ^ Ultl6
- ,A;Vt "
^, 711syil tltl'''.
"H,Tu" d'-/ c,
Dotani.cal l{arnc Conrnon llamc
Pagc 2
Plant 11;rtcri.al.s Contirrttcd
Qlgrntity
Wba61E &L figf trz4p> r@_ uZ
tlr4 atttwra runttrzeqttw-orant-
W n V ? TtlAnf+fr_+btutr,vLl4r@D
(+E'\'trtv1 ? W
Si.z.e
c.)OTH]IR LANDSCAPE FEATURES
(Retaining I'laIls, Fences
(Plcase Specify)
, Swinuning Pools , ele. )
Project Application t
--/
' .D^t / t/f/tro
/
Proi€ct Nam€:
Project Description:
Owner Address and Phone:
Arcb eot Address and Phone:
f ,1,fy.r<f,-
Legal Description' Lot l0 t- /f , Bloct
Zoning Approved:
Design Review Board
DISAPPROVAL
Motion by:
Fr.lp-
Chiel Building Otficial
b
orynorAddress and phone: t)n'r 6o j /A r/r, - 4 76 of| (
Conlrarr{- |
Archit€ct Address and Phone:
L€gal Description: Lots-J()tL- , Elock Filing
Zone:.
1., i's -l /..
Deslgn Revlew Board *- tf sf so
OISAPPROVAL ,n4-1.;^
, Motion by:
ii/-s^t.t
# 4?PROVAL )
/lr/;//,0*,1!/
il
^'tlo
e Project Application
/;-/2o hr
Proiect Name:
Proiect Description:
Owner Address and Phone:
Architect Address and Phone:
77o - 4bb
Lesal Descripti on vol f O* / | , eto.r
Zoning Approved:
Design Review Board
APPROVAL
\. i )LL4'LW
DISAPPROVAL
Summary:
Zoning Administrator Chief Building Off icial
)
tr--l
{o^.fu-;.a^h;
R">
v
I
-T0^_ FeA"fr; ?d^
Ur"P,. t3- Ia 8o
f"^r+2;-- ; ,<o-+J1tt t,
UJ'rfafr,'fz f.zzt pE--
fa
{Aoe
-4
*x.'lo +lt, u'i ea-T-ta P^H--T/z 5,44a-:-u 3.-,<g.^^ o- f,",a76
ftK
I
I
I
I
ll,:
l.i
I
I
I
I
I
I
I
I
t,,,
t;l
I
I
I
I
('
(-'
o
t:
(,
6
-t)
U'U'u,
l::
o:(tl
o
.
,,Y
t.li-.
z
:<
a<
c-
@o
ur rE
;i>
l- )i
-)ll
tltltltl
a
a?
<)- "<.( O-dc)('r o:
ooz<)
(!:,-
\t
A
atIta
(.
FI'l
1.. I
FIol
{l
EI\l
ii(!l
:l
fi
;:i
;i
.l(
a6v\
h;
vt
:F
:r:
;
IIr
o\)
\,\l rl
{:l\,1>l
-- I(Jl
?:
F
trJ
O
s,\lql
. risl
tll
F.
o
l.-
Z
i1
.t7
$il ,l ,l$-tlal,rl.$ibJElST,t .rl I ro- | .arl I cit qt ,{
jtl shrl
-1.,1,:l€l i
fil ql rl "ll ,-l i:i J
8l si -i3
>- ,l lrl :{F l ('', aj
(.l I .;.1 :i i;
-ii---'=d--it -roil -i F-I c( (-,il Ir, .(ll =: cr:
'l trt t-'tl o,'.JI ()
I
\,
L
Lrt_t{_i
()
J)
.l:
I
i
; | ,.
i | ()
IYol-()
tl:
I
(-)
rt,'t'
o
o
t).(
(t'. ,
(-,
o:lt,
t
-v
;,: ( I.- .(
( ) :.tr/ :.
trl ()
() ;
()
U,
.-l.(. ( )ll'tt
lll L!l
-r f)
<)
I
as\s
ca(l
o
;:g
c-)
(4
z
t
q
N
7
t2
C]
:
:
.I
cl
:)
aa
<)
7
o-
()()
ci
-
=
;()
:)::
z()
.:
;a(-)
.a
:)
.(
f()
(:)
l)
t-.{
--]:)
t./)
{1,:)
?
ga
z
!l
ir
F.
ea
YO
AI>l\ol-l\l
13l
{l
Ilt,{cl(.1
ct
t-\
{
l'5
q.
)\
tJ\as
t..)
a(,
(t)
-)
?i
I
I
"l\
I
l--
J-zoz
'.,. -i().)
:) :)
-JOo- u-
c
E
:'.
..t
.+:
E
(:()
*
*!.
LLI
n
z
tr:(")3
ry
F-(nz
OU _l
-J <(.{ arta t \ -'a
al' 'r
(:l ru l:
()
&i-tt-i
.4
;-'.-1 ."-"1
"**!i ^- ,t !
Craftsmen Construction Company' Inc'
November 25, 1980
Mr. Peter Patton
Town Planner
Vail CommunitY DeveloPment
75 South Frontage Road
Vail, Colorado 81657
Re: Gotenski Condoniniums
Potato Patch
Vail, Colorado
Dear Mrl' Patton:
We worked with the Vail Design Review group in early 1978 on approval
;i;;il;;yisecondary residenies for Gotenski, rnc" on Lots 10' 11' and
fS of potato Patch Subdivision, Vail, Colorado'
Subsequently our client has sold the.property and neither we nor the
designer, sid Flook, u"u-"o" involved'wiitt tiie pToject in any way. The
Town of Vail.contaci"a f'1", Flook to aclvise that your approval had expired
since nore than a year had'elapsed and resubrnittal would norv be necessaly'
iou-"pp.runtly obtiinecl l,ar. Fl-ookrs nane frorn the drawings provided by
another builder. tlr. proot is not interested in working with this unknown
buil.der and therefote ha, no capacity to enforce quality or adequacy of
construction.
We request that you remove our and Mr' Flookrs names and registr"!1?l .
frorn all documents on this project since he has no desigl responsibility
under the Present status of ownership' Please acknowledge with your
positive response to t-his request. i'letse call us if you have questions
or differences with this request.
$incerelY,
&{ Bo."^t
K. G. Bergetu
Vice Presidr:itt
K6B/ph
{-t tiri;t'
box 100
vail, colorado 81657
(303) 476-5613
K. G. Berget
Vice President
Craft snen Constnrction Conpany, Inc.
Greenwood Plaza North
5660 South Syracuse Circle - L6
Engl,ewood, Colorado 80f11
Dear Mr. Berget:
Ue have received your letter of Noveurber 25,
Sid Flook would like yolrr names renroved from
Lots 10, 11, and 13 of Pctato Patch.
department of community. development
January 5, l98l
Re: Gotenski Condoniniuns
Potato Patch
Vail, Colorado
1980 st.ating that you and
the at'ove condoniniuns on
Although re cannot physical ly renove your names from documents from 1978,
we will not consider then connected with the project any longer, and will
keep your lette! in our files.
i
:br