Loading...
HomeMy WebLinkAboutVAIL POTATO PATCH BLOCK 1 LOT 29 LEGALDEPARTMENT oF coMMUNrt" oiuroPMENrTOWN OF VAIL 75 S, FRONTAGEROAD vArL, co 81657 970-479-2138 Building----> $3,166.55 Restuarant Plan Review-> Plan Check---> $2,058.26 Recrcotion Fee-----> Ua-^\PYNOTE: THIS PERMIT MUST BE POSTED ON IOBSTTE AT ALL TIMES ADD/ALT SFR BUILD PERMIT Permit #: 807-0163 Project # PRJ07-0029 Job Address: 805 POTATO PATCH DR VAIL Status . . . : ISSUED Location.....: 805 POTATO PATCH DR. Applied . . : 0610512007 Parcel No...: 210106301019 Issued . .. : 09/051200'1 Expires..,: 0l/07/2008 ohrNER LARCH, S.A. 06/0s/2007 c/o CERISoLA 805 POTATO PATCH DR VAIL co 8r_657 APPLICANT BECK BUILDTNG COMPAI{Y 05/05/2007 Phone: 970-949-L800 P.O. BOX 4030 VAIL co 81658 License: 117 -A CONTRACTOR BECK BUILDING COMPANY 05/O5/2OO7 Phone: 970-949-L800 P.O. BOX 4030 VAIIJ co 8l_558 I-,icense : 11? -A Description: BUILD RETAINING WALIJ Occupancy: R-3 Type Construction: V-B Valuation: $488,000.00 Revision Valuation: $0.00 Total Sq Ft Added: . 0 * ra r'rrt it a t a a't a ta rla t*ai r *:r r:r **,it t * * $0.00 ToTALFEES--.-----> $4.00 Lo[ ac ,.B(k t $0.00 TotalCalculat€d Fees-> $5.228.81$0.00 Addilional Fees----> $0.00 $5,228.81 Total Permit Fee----> $5,228.81 Payments--------------> $ 14,448.49 BALANCE DUE----> $9,219.68) lnvestigation.-> Will Call----> *,1t * t, * | | * a'l t,l * tt 't I t a+ ll ** +t | * a'l l,|l { * a* li tl * '} li * * Approvals:Item: 051-00 BUILDING DEPARTMENT 06/25/2007 cgunion Acti-on: Ap 09/O4/2OO7 cgunion Action: Ap REVISED PLANS APPROVED FOR REDUCED SCOPE OF WORK Item: 05400 PLANNING DEPARTMENT 06/2I/2007 Warren Action: AP 08/28/2007 Warren Action: Ap The revisions to the building permit rnt eliminate the additior, "t. O approved. Only the driveway and retaining wa1I will be constructed. Item: 05500 FIRE DEPARTMENT 06/05/2oo7 DRhoades Action: AP See conditions also. (,J,IR did DRB review) Circumference of house exceeds 300' from approved fire department staging. Fire department staging unavailable in driveway. Topographical and architectual features prevent 350 degree access. Scope of work includes existing structure as well as new addiE.ion. Fj-re sprinkler system and fire alarm system required. Item: 05500 PTBLIC WORKS 06/15/2007 gc Action: DN provide more information on retain j-ng wa11. O7/O3/2OO7 cC Action: AP PER GEORGE CHALBERG See the Conditions section of this Document for any that may apply. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, Intemational Building and Residential Codes and other ordinances ofthe Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY.FOUR HOURS IN OFFICE FROM 8r00 AM 4 PM. TURE OF O FOR HIMSELF AND OWNER '}'**!t*'l{.*'|'}{.****{t**,},}!t,t****'|t*{i*:t:**:**+***,}*,}*****|**+**'r*{''i't*,t*,|.'}!*'|.{l**lt'|.*,}'}**** CONDITIONS OF APPROVAL Permit #: 807-0163 as of 09-05-2007 Status: ISSUED *,f *{t*'t't****'i**rl l!tl*,t**+'ltr*********{r't**'tr***t*+t'**:t 't:t:}'tt't'tr****************{.'}*'}**'t*****'t*******r}*********!t** PermitType: ADD/ALT SFR BUILD PERMIT Applicanr BECK BUILDING COMPAI.IY 970-949-1800 Job Address: 805 POTATO PATCH DR VAIL Location: 805 POTATO PATCH DR. ParcelNo: 210106301019 Description: BUILD RETAINING WALL Applied: 06/05n007 Issued: 09/0512007 To Expire: 0l/0712008 *'|t't'|.**{t******'**************:|t'}*'|.{':|****+**,|.*{.*,t*|**!tConditions*'tt'|t:t,}:t'f'}t**:}*+**:}*!t,}+:t*'t'*{''t**************** Cond: l2 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE, Cond: CON0009035 Monitored fire alarm system required and shall comply with NFPA 72 (2002 ed.) and Town of Vail Standards. Cond: CON0009036 Fire Sprinkler System required and shall comply with NFPA 13 (2002 ed.) and Town of Vail Standards. * "Oo * r PAGE: l- Xr328LFPo ENTRY. t REcErvrNG FPO NUMBER : F30611- DATE RECEIVED: 9/L2/O7 REMARKS : BECK BLDG CO - REFUND OVERPAYMENT RECETVED BYr LC ElfltEREDz 9/12/o7 13:35 BY: LCAMPBELL, VENDOR: 0000001 - BECK BUILDTNG CO INVOICE NUMBER: 807-0163 INVOICE DATE: 9/12/07 INVOICE POSTED: 9/L2/07 13:35 BY: LCAITPBELL PAYMEMr DUE: 9/2a/07 AMOUNT: $ 573s.2s ACCOITNT# PROJ# A]'IOIJNT ITEM DESCRIPTION 00100003111100 1l_ 10 0 0 0 31_ r27 00 # 5362.20 VALUATION REDUCTION - REFUND DIFFER S 373.05 REC FEE REFUND - NO ADDED GRFA coFy ,r':\ APPI ,-.ffi ^*'S.$?;*;[9^Hl;*Titf#*'" Separate Permits are required for electrical, plumbing, mechanical, etc.! 75 S. Frontage Rd. Vail, Colorado 81657***All Revision submittals must include the Field Set of appro CONTRACTOR INFORMATION General Contractor: t ck- GREG. CHRISATTENTION: JOE, Contractor Signature: GOMPLETE REVISIONS EVALUATIONS FOR BUILDING PERMIT (Labor & Materials REV|SED AMoUNT: $ 4D0r00D -ELECTRTCAL:S 1000 -OTHER: $ PLUMBING:$ hL &( 'MECHANTCAL,$ 5.t,C00 -REVISED roTAL: $ +l)?, , C00 - For Parcel # Contact Eagle Coutlty Assessors Ottice at 97 lr:-;--:. ::l ;illrq'wer" a\ D\ ob3o I D lq Job Name: t-tr lco\a [2-t S i rlt n f C Job Address: BUa ijohfo \;(frt^ Dnye-. Lesat Description ll r-ot, -}Q ll erocr.' I ll ririns'subdivision: p6tAb Pafrl'^- owners Nu'"'Rdr,r lu is.iru ll SSa"''Potnlo 0nht^ Dv Va^ \ llflf-oP,"iqnquqq-t"ga ArchitecUDesisner: p6,y l[ol lqVf S o#[,"tEo { a1.{D vCr, \ . Lo g\lo4l:EfH3"r,l1, -zzo\ snoineer:Jfip \n6 Atglgttrnr lf;rc o to,r^tu ?wL 6$ t}tla P4q["--'l la--1r,.rr ffi -Dt,v..c o[ cLrwcwarl , ndfud re fa.nir.iv"aq,?[SJ.t WorkClass: New() Addition( ) Remodel ({) Repair( ) Demo( ) Other( ) Work Type: lnterior ( ) Exterior (! Both ( )Does an EHU exist at this location: Yes ( ) No X Type of Bldg.: Single{amily (f,) Two-familV ( ) Multi-family ( ) Commercial ( ) Restaurant ( ) Other( ) No. of Existing Dwelling Units in this building: t No. of Accommodation Units in this building: No/Tvpe of Fireplaces Existinq: Gas Appliances (2 Gas Loqs ( ) Wood/Pellet ( ) Wood Burning{) No/Tvpe of Fireplaces Proposed: Gas Appliances (X) Gas Logs ( ) Wood/Pellet ( ) Wood Burning (NOT ALLOWED) Does a Fire Alarm Exist Yes ($ No ( ) ll Does a Fire Sprinkler System Exist: Yes ( ) No (X) r{- *i***************************************FoR oFFtCE USE ONLr**********************************t****** Date Received:Permit Fee {10} Accepted By:Permit Fce (11) http://www.vailgov.convdocs/dl_forms/building_revision_4-18-2007.doc Page 1 of 1 4t18t2007 TOWN OF VAIL 75 S. FRONTAGEROAD VAIL. CO 81657 970-479-2t38 O orro*rMENroF coMM'NIrY otrort"*, NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ADD/ALT SFR BUILD PERMIT Permit #: 807-0163 Project # PRJ07-0029 Job Address: 805 POTATO PATCH DR VAIL Status. . . : ISSUED Location.....: 805 POTATO PATCH DR. Applied . . : 06/05/2007 Parcel No...: 210106301019 Issued . .. : 07/ll/2007 Expires . ..: 0110712008 oI^tNER IJARCH, S.A. 06/05/2007 c/o cERrsor.,A 805 POTATO PATCH DR VAIL co 81657 APPr-,f CANT BECK BU]I-,DrNG COMPANY 05 / 05/200'7 Phone: 970-949-].800 P.O. BOX 4030 VAIL co 81558 Li-cense: 11-7 -A CONTRACTOR BECK BUILDING COMPANY 06/05/2OO7 Phone: 970-949-7800 P.O. BOX 4030 VAIL co 816s8 Li-cense: 117 -A Description: BUILD RETAINING WAI,I-,,, ELEVATOR IN EXISTING GARAGE, ENI.,,ARGE THE EXISTTNG GARAGE TO PARK 3 CARS AND ADD GUEST SUITE Occupancy: R-3 Type Construction: V-B Valuation: 1,800,000.00 Revision Valuation: $0.00 Total Sq Ft Added: 2487 * ++a tr *+ * +a *t,l rl +**,l t+ ll r ta r* **t 't t Building----> $8,528.75 Restuarant Plan Review-> $0.00 Total Calculated Fees-> $14,448.49 Plan Check--> $5,543.69 Recreation Fee----> $373.05 Additional pee5-----.-> $0.00 lnyestigation-> $0.00 TOTAL FEES-----> $14,448.49 Total Permit Fee--_.-> $14,448.49 Will Call---> $3.00 Patments-------.._-> $14,44E.49 BALANCE DUE-._-> $O,OO t + t l +r t ++ +ll ++ l + + 'l +t * r * i* *:t r * a * t:l * Approvals:Item: 05100 BUILDING DEPARTMENT 06/25/2007 caunion Action: AP Item: 05400 PITANNING DEPARTMENT O5/2L/2OO7 Warren AcCion3 AP Item: 05600 FIRE DEPARTMENT 06/05/2007 DRhoades Action: AP See condilions aLso. (,JJR did. one revil Circumference of house exceeds 300' from approved fi department staging. Fire deparEment staging unavailabl-e in driveway. Topographical and architectuaL features prevent 360 degree access. Scope of work includes existing structure as wefl as new addltion. Fj-re sprinkler system and fire alarm system rtem: O5iOO PUBI,IC WORKS 06/),5/2007 gc Action: DN Provide more information on retaininq wal-I. 0"t / 03 / 2oo7 Gc Action: AP PER GEORGE CHALBERG ,i * * *:r r * a t * a* l ++ l l See the Conditions section of this Document for any that may apply. DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR 4 PM. INSPECTION SHALL BE MADE TWENTY-FOUR HOURS TN ADVANCE BY TELEPHONE AT 479.2149 OR AT OUR OFFICE FROM 8:OO AM . TURE OF O OR CONTRACTOR FOR HIMSELF AND OWNER o re vv *.t.t'i.:it++{.*1.****:*:**+*+***++***+***!i***!t**i.*'t**+:}i.:}+:l.:t.+****+,t.*,l.****,t.**{.+**{.'}*'l.*+!*+*+*,|*{.*,t'tl'l.+*+***+****,| CONDITIONS OF APPROVAL Permit #: 807-0163 as of 07-11-2007 Status: ISSUED ,1. !i * * **:* *'l * + * *+ * +**'t,f 'l * * **'t * * * ** ****'l,l' {' * *i.*** **** ***'F**** * * * ** * * * *:} * {' * ***,f * * * *** * * +* * * * *t * * * *'l 't * * ******* * Permit Type: ADD/ALT SFR BUILD PERMIT Applicant: BECKBUILDINGCOMPA}IY 970-949-1800 Job Address: 805 POTATO PATCH DR VAIL Location: 805 POTATO PATCH DR. ParcelNo: 210106301019 Applied: 06/0512007 lssued: 07lll/2007 To Expire: 0110712008 Description: BUILD RETAINING WALL, ELEVATOR IN EXISTING GARAGE, ENLARGE THE EXISTING GARAGE TO PARK 3 CARS AND ADD GUEST SUITE {.,}{. {. *,t '}'1.*'t+:1.{.*+++:t *'t 'i 't * * :t 'i * * * {. * :t ,t * {. ,} * * * Cond: l2 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLI.ANCE. Cond: l6 (BLDG.): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION R3I3 OF THE 2OO3 IRC. Cond: CON0009035 Monitored fire alarm system required and shall comply with NFPA 72 (2002 ed.) and Town of Vail Standards. Cond: CON0009036 Fire Sprinkler System required and shall comply with NFPA 13 (2002 ed.) and Town of Vail Standards. Cond:18 (BLDG.): STAIRWAYS ARE REQUIRED TO MEET SECTION R3l1.5 OF THE 2OO3 IRC OR SECTION IOO9 OF THE 2OO3 IBC. Cond: 19 (BLDG.): GUARDS ARE REQUIRED TO MEET SECTION R3l2 OF THE 2OO3 IRC OR SECTION IOI2 OF THE 2OO3 IBC. Cond: 34 (BLDG.): A COPY OF THE SOILS REPORT WILL BE REQUIRED BEFORE A FOOTING INSPECTION WILL BE CALLED FOR, Cond: 39 (BLDG): EMERGENCY ESCAPE AND RESCUE OPENINGS ARE REQUIRED TO MEET SECTION R3IO OF TIIE 2OO3 IRC OR SECTION IO25 OF THE 2003 IBC. Cond: CON0009096 SPECIAL INSPECTION REPORTREQUIRED FOR ALL SHORING WALLS PRIOR TO FOOTING INSPECTION. rr**t'tt'tr | | * | r* * | | r t+**r*****a**'i't**:i *t**:i:t't******a**rr+rl*,t't't't****'a * * * * * * * * * * * ** * tt* * * * * * * * TOWNOFVAIL, COLORADO Statement {' {r*1* **ft t* 'l * * ** * * * * at*a*** +**i*****ttt*t*t:t*rr'tt* a** * ***ft'l'lt 'l i ***tlt I I 'l * * * * * * i I t* *'l * * * * * * * Statement Number: R070001208 Amount r $8,904,80 O7/LL/200702:33 PM Payment Method: Check L3672 Init 3 DDG Notation: Beck Building Co Permit No: BO?-0153 Tlfpe: ADD/ALT SFR BUILD PERMIT Parcel No: 2101- 053 - 0101- 9 Sit,e Addreaa: 805 POTATO PATCH DR VAIIJ I,OCATiON: 805 POTATO PATCH DR, ThiE Palmenc:98, e04.80 Total FeeB: $14,448.49 Total J|IJJ [rnt8 : il{ , 448 ,49 Balance:$0.00 ***1.*** ***ltl*******'t***r*t*ttrt *t**ilt*t* I I t***ttlllttt* * ** * ***i'l * * 'l | | * t * * * * t * * | * * * * * * * * * I | | ACCOUNT ITEM LIST: Account Code Deacriptsion Current Pmtg BP 00100003t 1.1100 RF 11100003112700 wc 001 00003112800 BUIIJDING PERI,IIT FEES RECREATION FEES WILL CALI,. INSPECTION FEE 8,525.75 5 /5. U5 3 .00 *{.,1* * t t + l. * * * * * * * * * * * * '|| {.* * ** 'l,l 'l * * * 't * ** 't l' {' **{r * t' 't 't * 'i rl * * 'l * 'l * 'a 'l * * * * * * '} * * * * * *,1* * * * 'l,l f 'a * * * * | l' *{.**** TOWN OF VAIL, COLORADOCopy Reprinted on09-12-2007 rltl3z22t2l 091l2n007 Statement t'****** * * * * * * * l' 'f 'l * 'l' 'l' 'li **'l**f * 't t 'f * * 'i {' lr:l' 'f l' {* ** {ri***** * * * t* ** * ** {* * 'l * * * * t * {' 'l 'l * * 'l 'l' * * * * * * * * * * * * I' I * Statement Number: R070000886 Amount: $5,543,59 06/05/200?11:29 AM Payment Method: Check Init: ,f,S Notacion: 13532,/BECK BUILDING CO, INC. Pernit Nor 807-0153 Type: ADD/ALT sFR BUILD pER"ltrT ParceL No: 2101-053-0101-9 SiIC Address: 805 POTATO PATCH DR VAIL IJocation: 805 POTATO PATCH DR. Total Fees: $5,228.8L r'|.r:r'tIt *t **,r****t***'t*+'|*ttt*******'t***'i*'}t*****f**I********************t* This Palzment: $5,543.69 Total AIJJ Pmts3 $L4 ,44A .49 Balance: 99,219.58) Current Pmtss ACCOIjNT ITEM LIST: Accounts Code Descrip! ion PF OO],OOOO31123OO PI,AN CHECK FEES 5,543.59 T-)loY'ETTR June 28, 2007 Town of Vail FFFfl:TJ ffiffi Cerisola Residence Excavation Shoring and Retaining Wall Calculations Vail. Colorado Prepared for: Beck Building Company PO Box 4030 Vail. Colorado 81685 Prepared by: M.C. "Mick' Muller. P.E. Yenter Companies, Inc. 20300 W Highway 72 Arvada, Colorado 80007 Kevin Brooks, EIT Yenter Companies, Inc. 20300 W Highway 72 Arvada, Colorado 80007 20800 W. Highway 72, Awrda, CO 80007 Phone: 303-27y44X Far 303-279-1D08 This design, including drawings and calculations, are intended solely for use by Yenter Companies, Inc., its subcontractors, and suppliers for the construction of the improvements indicated in this design. Yenter Companies, Inc. retains sole ownership of this design, drawings, and calculations and they shall remain the property of Yenter Companies, Inc. These drawings and calculations may not be copied, reproduced, or used without the prior express written permission of Yenter Companies, Inc. Copyright 2007, Yenter Companies, Inc. All Rights Reserved 20300 W. Highway 72, Awtda, CO 80007 Phone: 303-27y44* Fa* 303-279-(D08 lndex 1. lndex 2. References, Design Parameters, and Assumptions 4. Mathcad Analysis of 13' Micropile Wall (below Potato Patch road) 11. SnailZ Analysis ot 22' Permanent Soil Nail Shoring Cut (for new addition) 16. Mathcad Analysis of 22' Permanent Soil Nail Shoring (concrete facing design) 26. Mathcad Analysis ol22' Permanent Micropile Shoring (optional, not included in drawings) 33. Building Loads Used in Underpinning Design 35. Analyais Shotcrete Column Used for Underpinning 36. SnailZ Analysis of Underpinning Section References FHWA Publication No. FHWAO-|F-03-01 7 Geotechnical Engineering Circular No. 7 - Soil NailWalls FHWA Publication No. FHWA-SA-96-069R Manualfor Design and Construction Monitoring of Soil NailWalls FHWA Publication No. FHWA NHI-05-039 Micropile Design and Construction Reference Manual FHWA Publication No. FHWA-SA-97-070 Micropile Design and Construction Guidelines lmplementation Manual California Trenching and Shoring Manual By: California Department of Transportation Division of Structures Office of Structure Construction Soils Report - Hepworth-Pawlak Geotechnical, Inc. Job No. 106 0938 Dated December 29. 2006 Software Mathcad Version 11.1 SnailAA/in Version 5.01 Soil Parameters Soil 1 (Fill) Soil2 Soil3 i=28 0=32 0=34 y= 115 pcf y= 125pd y= 135 PcfQa=6psi Qa=12psi Qa=12psic=50psf c=100psf c=100psf Minimum Factor of Safety Global Stability: 1.5 Bearing Capacity: 2.5 Design Assumptions and Clarifications The following is an explanation of the shoring design methodology and any assumptions used for the work to be performed at the Cerisola Residence, Lot 29, 805 Potato Patch Road, Vail, CO. The shoring/retaining walls consist of three separate areas. These are the upper site wall, the new addition shoring, and the existing building underpinning. All retaining and shoring walls have been designed with a minimum global factor of safety of 1.5. Upoer Site Wall The upper site wall is located just below Potato Patch Road, on the North side of the property. This wall has been designed as an "A'frame micropile retaining wall. The reason for this type of wall is to reduce conflicts with any utilities located in Potato Patch Road, and to maintain any permanent retaining wall within the property boundary. The micropile wall will stay within the property boundary, and should not affect Potato Patch Road. The construction of the retaining wall will require that one lane of the road be temporarily closed. The micropile wall will be faced with a segmental retaining wall block to match the existing retaining wall. New Addition Shorinq The Shoring for the new addition is designed as a permanent shoring wall and has been designed as either a soil nailwall, or a micropile wall. Calculations for both types of walls are included, although currently the plans only show the soil nail option. The shoring for the new addition will not cross any property boundary. Existinq Buildino Underpinnino The underpinning for the existing building will be completed in stages. The first step will be to install tiebacks through the existing walljust above the footing. Next, about two feet of soil will be excavated below the footing and a second row of tiebacks will be installed and covered with a shotcrete facing. The excavation will be completed to the final depth and another row of tiebacks and shotcrete installed. .lb Psl := -tn ^rb^tbpsl:= - Pct := -ftt ftr Distance from top to anchor L1 := Oft L2:= Oft L3 := Ofr L4:= Oft L5:= Oft Back row USDI := l0 D1 := Oin t1 := Oin b1 := 5.25in 51 := 36in lbkip:= l000.lb ksi:= 1000.: in2 Tension (divide bv horizontal spacinq) T:= Olb Length of wall L,r:= 65ft 1. WallGeometry Height of wall Angle of backslope Soil friction angle Soil unil weight Horizontal load 2. Micropiles Distance between MP rows Batter angle of rear MP row Elastic modulus of steel Compressive strength of grout Yield strength for steel bar Yield strength for steel pipe Rebar size Outside pipe diameter Wall thickness of pipe Borehole diameter Spacing 3. Load and Resistance FactorB v\:= I YE. := I Yt := I Yr6:= I t6,:= 0.35 @Ep:= I OFr:= 0.66 <D6:= | Load faclor applied to surcharge Earth pressure reduction due to back row of micropiles ( S 1) Moment Reduction (both rorvs) Reduced Moment in Back Row Due to Soil Supporl (additional) Steel Shear Strength Reduction Factor Resistance Factor for passive earth pressure resistance Resistance Factor applied to Flexural Capacity of vertical elemenls Resistance Factor applied to Ground Nail Facing Capacity (Punching Shear) H= 13ft p:= l8.deg {:= 32.deg y:= l2Opcf _ kipq:= )--ft Front row dl := l2.in ro := l0.deg E.:= 29000.ksi ft:= 3000'psi F6r:= 75ksi Fpy:= 35ksi USD:= 10 Dg := Oin tg := Oin bs:= 5.25in 56 := l Sin Yenter Companies, Inc. 20300 W. Highway 72 Arvada. CO 80007 Page 1 of7 ## - 4. Earth Pressure Flr:= if(ts = 0,F6r,For) F2r:= if(t1 = 0,F6r,For) Ka = 0.358 *dp) * \=2'sz+ Active Load pa := (o.6s.Ka.y.H).yEr Pa = 363 psf yEr.25.H = 325 ft Pau'= 1(KeE a = 1.4ft nu1:= eu.f R"" ,= P'. u'ft '2 R6:= q.yla.ft Passive Load YRal := 2: Ypn2:= H + Z3 vn:t= GP Ral = 2362Ib RaZ = 254Ib Ra: = 5000Ib Ynat = 8.67ft Ynaz = t:.s3ft Ynu: = 10ft Active ep Active ep below mudline Surcharge eo:= y.(ro - ru).1a - a; Pp = 1456psf Ynp = 18.t3ftP,^;= P^' (d - a)'ft rY2 5. Depth of Embedment Depth of embedment (guess) Sum Moments: YpO:=H+a+(d-a;.3 Rp = 4078IU (Change d until sum of moments is approximately zero) increase d if moment is positive decrease d if moment is negative (Rur.ynur) + (nu2.vpu2) + (nd.vqd) - ("o t*J - r.(r,1 + L2 + L3+ La + L5) = 0 ft.kip 1.0.d = 7ft 1.2.d = 8.4ft 1.4'd = 9.8ft 1.0'd+H=20ft 1.2.d+H=21.4ft 1.4.d, + H= 22.8fr. Set user defined embedment depth ld,r=-tzq Ht=25ft .or(p)2 - "o.(o)2 "o(o)2 - "o.(o)2 Ht:= H + du Yenter Companies, Inc. 20300 W. Highway 72 Arvada, CO 80007 Page2 ol7 6. tletermine the equivalent steel Area and toment of Inertia of the composite section for each tlP section in the MP shoring wall: Es:= sTooo.t@i:;; Ec = 3.122 x lo6psi Eso"'= E no,= ir(no=0, utlitt",?) *r= 0.625in *,,=,r[o, =',-f,i) R, =0.625in n::= if(Ro = o,b6,Ro - t6) R3 = o.625in R4:= if(Rl =o,bl,Rl -t1) R4=0.625in n2,= P.1.in 8.2 nc = 9.2E9 R2 = 0.625 in Elastic (Young's) Modulus for Grout Modular Ratio Outside Pipe Radius Outside Grout Radius ,u*,,= ; [,*oro - <n:ro] . # . *1 ,**'= ; [[1*rya - lnaya]. (*)l*/' . *,1 A1e,11:=,, [,*r'-(ru)2]. #. *1 Aback := " [,*,,' - (R4)2] . *q . *,1 Outside Rebar Radius USDI R2l := -.1'in rnont=0.r2in4 rront l[:t*#1;B;l1i'""" Iback = 0'l2in4 back Afiont = l.227in' front Aback = l.227in' back Yenter Companies, Inc. 20300 W. Higtway 72 Arvada, CO 80007 Page 3 of 7 tlr + linN:- N = 301lin i:= l..N L.:= i.in H= 13ft E=25ft l Aback."r. xx.:= L.'tan(6) + dt .,,= ;-*I Aback Afront tan(o/ = 0.176 s1 so ,,2 , .)I6n1 + Alon1.(c.|- I6*p + Agu"p.{xx. - c,)- n.n . \'/ \ r r,/ 'so51 I.:= IMP.ll oFs.Flv.l. oFc.F2v.l. Mln.:= ' ' Nl2n.:= ' ' 't Do I DlTrbc,+- xx.-c.+-12rl2 max(Mln) = 220 kip max(M2n) = 110 kip Right side loading diagram po '= q *f-r H+ d l(('os'r"'r'i'i",1) ir i'in-i = " I o ott "r*tr" Left side loading diagram l-er-',= l[r'(rn-nu)'1i'in-(H+a)]] if i.in>H+ 3 Passiveearth pressure lo otrrenvise Anchor Loads ru1 := fr if i.in=Ll no:= lr if i.in = L2 ,a3i:= lr ir i.in =r-3 nua := lr if i.in=L4 nas := lr if i.in =L5 l0 otherwise l0 otherwise l0 otherwise l0 otherwise l0 otherwise Yenter Companies, Inc. 20300 W. Highway 72 Arvada, CO 80007 Page 4 of 7 V:=oo'* for i e l..N n <- [o.s'(rn, * \_,) - (t, * ..,_,)].(t,- L"r)_]* Di-, Di - Di -.o.i Di - Di -."* Di - Dr- to.i D. <- D. - ro.* D. <- D. -.o.* ifL.=H-Lt ifL.=H-Lz ifL.=H-L3 ifL.=H-L4 ifL.=H-L5 M:= rr | .: ,Ji " loo' '[o's (v' + ut')'(t - t-",)] + o' , R:= D n <- o.!ft aRt= for ie 0..N ifL.>r4 ln <- v.I' lu.""t R oo - o.{ for ie l..N lo,- o ir L. <rrr ;n. <- o.s.(en * pn,_,) - (O, * rt,_,)] (., D - r.._,) rr l. > ut * = -r.utrIEft an:= )an an = -o.+re!lP ft P:= -Pl Mmx := max(M) Mmx = ZS.O66 kip.* n Mmn:= min(M) Mmn = l, tO 3tip Maximum (factored) Moment Minimum (factored) Moment Yenter Companies, Inc. 20300 W. Higtvay 72 Arvada, CO 80007 Page 5 of 7 Ml n = fronl ror allorable moment = red line M2n = back row allowable moment = blue line M = applied moment = green line H= 13ft E=2sft c1 := min(Mln - M) c2 := min(M2n - M) Checkyln := if(ct < -2lb, "Check Front Row' , "OK" ) Checkppn := if(c2 < -2lb, "Check Back Row' , "OK" ) max(M, Mln, M2n) = 229 Yi, max(M) = 75.666krp = "OK" = "OK" 8.33 Applied & Allowable Moment Diagram ! ft 6Lqg- ;ftE----- Ar- ft 16.67 25 0 20 40 60 80 100 120 140 160 lEo 200 Mln M2n M kip kip kip Moment (kip*ff/ft) Yenter Companies, Inc. 20300 W. Highway 72 Arvada, CO 80007 Page 6 of 7 Acvive earth pressure resultant Number of piles per ft Active force per pile Shear strength of one pile ,^,=+*, N.'= I * I 'so51 ."0,= ft s'= uo,.yry[(#)' P" = 8.63as-ft N"= l1 Pap = 8'634kip 1.rrin2l so = 32.2l4kipI FSs := sp Pap FS. = 3.731 Micropiles per foot Number of micropiles Drilling Lengih of cap .pr,= a * a'51 56 Nmp:= mpf .Lw bhf := Nmp'I! Impf=l-'ft Nmp = 65 bhf = 1625 ft Lw= 65ft Yenler Companies, lnc. 20300 W. Highway 72 Arvada, CO 80007 PageT ol7 lloo Date: 04-19-266?Snaillfin $.firc: Gcri*ola llcr fiililit Minimum Factor of Safety = 1.55 42.8 ft Behind llall Grest 2.9 ft Delour llall Toe H= 22-g It LEGEND: PP= 2-? k/tt PS= 22.9 l(ips FI= {5.e Xsi $h= 4.6 ft Su= 5.6 ft GR]I PHI COH SIGpcf deg psf psi115.6 28 56 6.8L25-g 32 Lgg L2-6135.6 34 Lgg t2.8 Scale = 16 ft t2 Page -File: Ceriso.La New Addition *************************************************** * CALIFORNIA DEPARTMENT OF TRANSPORTATION * * ENGINEERING SERVICE CENTER * * DIVISION OF MATERIALS AND FOUNDATIONS* Office of Roadway Geotechnical Engineering * * Date : 04-1,9-2007 Time: 08':22:36 **************************************************** First Slope from lva1lcrest. Second Slope from 1st slope. =Third Slope from 2nd slope. Fourth Slope from 3rd slope. : F i fr-h ql.rna f r"^rn ?rzl c l anaJ+vPv.Sixlh Slope from 3rd slope. Seventh Slope Anqle First Slope Angle below Toe. Eirst Slope Distance from Toe. Second Slope Angle Second Slope Distance from Toe. Vertical Depth of Search. Number of Searches below wa11 Toe. = Project Identification - Vertical Wall Height WafI Batter Unit Friction Soil Weight Angfe Layer (Pcf) (Deqree ) 1 115.0 28.0 2 1.25.0 32.0 3 135.0 34 .0 Cerisola New Addition WALL GEOMETRY --------- 22.0 fE ? fl r|aaroa Angle Length(Deg) (Feet )0.0 25.085.0 13.018.0 20.00.0 100.00.0 0.00.0 0.0 0.0 SLOPE BELOW THE WALL ---- suRcfiARGE --------- THE SURCHARGES IMPOSED ON THE SYSTEM ARE: Begin Surcharge - Distance from toe = End Surcharge - Distance from toe Loading Intensity - Begin Loadinq Intensitv - End 0.0 degrees 0,0 ft 0,0 degrees 0.0 ft 5.0 ft 5 2.0 ft 25.0 ft 240.0 psf/ft 240.0 psf / ft Cohesion Bond* Coordinates of Boundary Intercept Stress xS1 YSl XS2 YS2(Psf) (Psi) (ft) (ft) (ft) (ft) ----- oPTroN #1 --------- Factored Punching shear, Bond & Yiel-d Stress are used. SOIL PARAMETERS --------- 50.0 100.0 t-00.0 0.0 20.0 L2 .5 6. 1a 0 0.00 0.00 0.0 ih a\hri^nfrr vP rfvrr 0.0 0. 014.5 t_00.0 7 .O t-00.0 * Bond Stress also depends on BSF Factor #5 when enabled. l3 Page - :File: cerisola New ii:l:l::_ wArER suRFAcE _________ NO Water Tab1e defined for this problem. SEARCH LIMIT --------- The Search Limit is from 1.1 to 44.0 ft You have chosen NOT TO TIMIT the search of failure planes to specific nodes. REINFORCEMENT PAR,METERS --------- Number of Reinforcement Levels = 5 Horizontal Spacing = 4.0 ft Di.ameter of Reinforcement Element = 1.250 inYield Stress of Reinforcement = 45.0 ksi Diameter of Grouted Hole = 5,3 in Punching Shear = 22,0 kips (For ALL LeveLs ) Reinforcement Lengths = 20.0 ft Reinforcement Inclination = 15.0 degreesVertical- Spacing to First LeveL = 1.0 ftVertical Spacing to Remaining Levels = 5.0 ft 14 FiIe: Cerisola New DEPTH MINIMUM BELOW SAFETY WALL TOE FACTOR(ft) Reinf. Stress at DEPTH MINIMUMBELOW SAFETY WALL TOE FACTOR(ft) 1.00 1.63 Reinf. Stress at Addition DISTANCE BEHIND WALL TOE(ft) 44.0 Level 1 = 3= A_ R- DISTANCE BEHIND WALL TOE(ft) 44.0 Level TOWER FAILURE PLANE ANGLE ],ENGTH /.l6d\ / ft- \ 24 .6 29 .O 0.000 Ksi 0.000 Ksi 7.575 Ksi (Pul-i.out 1,1 .852 Ksi (Pullout 28 .L29 Ksi (Pullout LOWER FAILURE PLANE ANG],8 LENGTH (deg ) (ft) UPPER FAILURE PI"ANE ANGLE LENGTH /.|ad\ / ft- \ 58.1 33.3 UPPER FAILURE PLANE ANGLE LENGTH(deq1 (ft ) 54.7 30.4 0.000 Ksi 0.000 Ksi 9.113 Ksi (PuIIout controls... )22.565 Ksi (Pullout controls. . . ) 20.618 ksi (Punching Shear controls, . ) DEPTH MINIMUM BELOW SAFETY WA],L TOE FACTOR(ft) 2.00 1.56 Reinf. Stress at Level 2: 2=3: R- DISTANCE BEHIND WALL TOE(ft) 44.0 LOWER FAILURE PLANE ANGLE LENGTH(des1 (ft) 32.r 3L.2 0.000 Ksi 1.824 Ksi (PuIIout controls. . . L2.65L Ksi (Pullout control-s. . . 23.477 Ksi (Pullout control-s. . . 22.33L ksi (Punching Shear controls..) LOWER FAILURE UPPER FAILURE PLANE PLANE ANGLE LENGTH ANGLE LENGTH(des1 (ft) (deq1 (ft) 5Z-t 5r.4 J5.J JU.v 0. 000 Ksi 0.265 Ksi (Pull-out controls. . . I0 .9O2 Ksi (Pullout controls... 2l .539 Ksj- (Pull-out controls... 24.458 ksi (Punching Shear control-s.. ) LOWER FAILURE UPPER FAILURE PLANE PLANE ANGLE TENGTH ANGLE LENGTH(des) (ft) (deg) (ft) 33.3 31.6 55. 9 31.4 0.000 Ksi 0.000 Ksi 9.211 Ksi (Pullout control-s... ) 19.666 Ksi (PuIIout controls. . . ) 26.515 ksi (Punching Shear controls. . ) LOWER FA]LURE UPPER FAILURE PLANE PLANE ANGLE LENGTH ANGLE LENGTH(des) (ft) (deg1 (ft) DEPTH MINIMUM BELOW SAFETY WAI,L TOE FACTOR(ft) 3.00 1.54 Reinf. Stress at DEPTH MINIMUM BELOW SAFETY WALL TOE FACTOR(fr) 4.00 1.54 Reinf. Stress at DEPTH MINIMUM BE],OW SAFETY WALL TOE EACTOR tfi-\ DI S TANCE BEHIND WALL TOE(ft) 44.0 Level 1 =2= 3= A- DI S TANCE BEHIND WALL TOE /f+\ 44 .0 Level 1 = 2= 3: n- DI S TANCE BEHTND WALL TOE /fr-\ .1b.f, sL.Y controls.. controls. . controls. . UPPER TAILURE PLANE ANGIE LENGTH /Aaa\ / fl- \\vvY/ l5 5. 00 r. 53 Reinf. Stress at Level- I =2: 3= 32 .0 f/.r (Pullout controls.(PuIlout controls.(Pullout controfs. 34.5 0.000 Ksi 0.000 Ksi 5.990 Ksi 16.096 Ksi 26.202 Ksj. ****************************r.*************************************** * For Factor of Safety = 1.6* Maxi-mum Averaqe Reinforcenent Workinq Force:* 6.984 Kips/level * ********t********************t**********r.*******************i******* Designed by: l(WB Ghecked by: MGM Soil Nail Wall Design ^ tbf Dst i= - DCt :=., tt psf ft kip:= 1000.1bf ksf:= l000.psf ksi:= 1000'psi Dimensions and Perm := I Soil/rock properties: S:= 32deg c:= lOOpsf y:= 125pcf material properties: 0 for temp, t for perm soil angle of intemal ffiction soil cohesion (used for bearing capacity only) soil unit weight A^.= "t n(0.:s.tun(O)) A = ll.Tdeg shotcrete/soilinterfacefriction Wall geometry (see figure 1): Ho:= 22ft h":= 2.ft i6:= 0.deg 0 := 0deg ily:= 0ft2 Reinforced shotqete th. := 5.5in WO:= 8in select wwf height ofground nail wall height ofupper cantilever section angle ofthe face batter with the vertical angle ofbackslope with the horizontal Area of wall face thickness of shotcrete (minimum) width of plate Figuo L Gound N.ilWeI S.h.mdic ST:= 0.087 0.t74 0.120 0.240 0.058 0.116 0.080 0.160 0.145 o.167 0.178 0.200 ) ln ft A-.r. := ST ^lt. lnA-"r. = 0.12- ft Layer of 4x4 W2.9xW2.9 of 4x4 W2.9x1A/2.9 wo Lavers of 4x4 W4.0xW4.0 5) One Layer of 6xG W2.9x\ r2.9 Yenter Companies, Inc. 20300 W. H$,y 72 Arvada, CO 80007 fi3-279458 Page 1 of 10 Ground Nall Wall Calcs Hr\2007 Prolects\Cerisola Residence\Designed by: KWB Checked by: I$CM -zln Amsn = 0.120 * area of steel (per foot) from wwf (equal in both directions) n f.:= 4000psi compressive strength of shotcrete . f*r:= 60.ksi tensile yield strength ofthe wire & facing rebar \6 := 0.5.in diameter of the vertical reinforcement bar uvD ,- &number of vertical reinforcement bars (assumed discontinuous) Qr6 := 0.5.in diameter of the horizontal reinforcement bar number of horizontal reinforcement bars (assumed continuous)n16 := 2 Ground nail properties S1 := 4.ft Srr:= 5ft horizontal spacing between nails vertical spacing between nails Qr:= l2.psi ultimate pullout resistance (ground-grout bond) D6:= l.25.in diameter ofrebar used in ground nail D, := 5.25.in diameter of grout hole L:= 20.ft length of nail f, := 75.ksi Yield strength ofnail in:= l5.deg nail inclination(horizontal) FiourB 2. Soil Nail & Roidorc€d ShoEI€b sch.malic 8 D1 := lt6.- ln 8D:= hu':ln 8D3:= 1t66. ' ln Hydrostatic loads: hw := O.ft height ofwater on shotcrete face (from bottom ofwall) y*:= 62.4.pcf unit weight of water Surcharge load: a := 72.psf uniform surcharge pressure simulating live traffic load (applied horizontally) f := 1.0 impact factor o16:= o'f osh = 72Psf Number of soit naits N '= "eilr It h") ^ = oIsu ) Yenter Companies, Inc. 20300 W. Hwy 72 Arvada, CO 80007 303-2794458 Page 2 of 10 Designed by: KWB Checked by: MCM Controlling group loads and reduction hctons (Service Load Design method): Reduction factors applied to ultimate strengths for facing, tensile yield ofbar and ground-grout bond. From Group I loading, Tables 4.4 & 4.5 pages 97 &99, Reference 1. facing flexure cr1:= 0.85 nail tensile strength o1 := 0.55 ground-grout pullout ct:= 0.5 Facing load: 0 := 90deg + ib IQ:=.in(e * O)2 .rn( Fp := 0.5 [. .."---t-------- -2-l e)2,in(e - a) ll r . J[:*f#"**#)] l ,",= [' (*- n*F * y.[H. - r,*).h*] * (' ;'*).n ^,'l r. ? * + Ho.osh 2'Pa ')rL- P^= l0.lE-ft earth pressure facing load per ground nail ths.56 Ka = 0'283 r, = 1s.1Ii!-ft o .- r"'# hpn- 2 2.Fp'Pa'56.Sy ,F,= ---E- tE = 9.2kip 1e = 41.9 Pcf Flexure capacity of reinforced shotcrete (per Reference 1): Perm = I Aolorot steel '= ,nJ-\ n"6'0.25.n.\6' + 56'A.16 + S'Amsh't'Drrt2 ths.sv n66.0.25 Aolotot steel = 0.0033 Yenter Companies, Inc. 20300 W. Hwy 72 Arvada, CO 80007 303-279-4454 Page 3of10 H:\2007 Projects\Cerisola Residence\Designed by: KWB Checked by: MCM cp:= cg:= if Perm =0 rAo74e1 51esl < 0.0035 C <- I otherwise c Perm=0 n Ao76o1 .1""1 < 0.0035 C +- I otherwise e I otherwise Avs.ft,v f ths Aur.t,v )mnv .= - - S5 l2 t.2.ft.s6/ C <- 2.0 if th. < 4.in C <- 2.0- 9.(,n, - +.in) ir th. > 4.in n th, < 6.in 2.in t - C <- I otherwise if C c C <- 2.5 if th. < 4.in c +- 2.5- *.(tn, - +.in) ir th, > 4.in ^ ths < 6.in c <- 2.0- *.(tnr - o.in) ir th, > 6.in n th, < 8'in Cp = t Empirical factors applied to the sholcrete flexure and shear slrength. Values are greater lhan 1 for temporary shotcrete less than I inches thick with a steel area less than 0.35 percent of the gross CS = t shotcrete section (allows greater flexure & shear capacity for flexible, temporary shotcrete). vertical flexure: t f o'nl- 2 An6 := nu6.r.l i I Avb = 0.4in' vertical bar area \.) An, := 56.A1151 + An6 Avs = 0.E73 in2 totial vertical steel area ,nnu = 2.g2 ! iig negalive momenl ,no., ._ (A',,, - Anu)'f*y.f ttr, _ (Rn. - nuu'enu)'f-l ,no" = 1.64 ft'kip posirive moment56 12 1.7.f".S6 J - ft (Oiscontinuous rebar) . /s.sh\ SVT.:= Aur. loo SV%=0.331Typp:= Cr.(-u * rnp").| ;- | Tytrp:= Tvnn.af r. S" ,/ ^ Sh'th. Tvrr = 28.6kip vertical flexure capaclty Yenter Companies, Inc. 20300 W. Hvry 72 Arvada, CO 80007 30927C.4458 Page 4of10 Designed by: KWB Checked by: MGM horizontal flexure: / onu'l- A66 := n55.n'l - | \L,/ A5r := Su.Arr6 + ,{1'6 Arrt = o.4in2 Afis = 0.993 in2 horizontal bar area total horizontal steel area An..f*u (th, An..f*" \ rrrv .- -'l ' s" \2 1.7.t.\/mn = 2.5e! 4P Tp41l:= THFF.of negaiive moment equals the positive moment (continuous rebar) . . /s.s"\rspp:= Cp'(mu + *) luj Tnrr = 5l.7 kiP sH%,= Attt'loo SH% = o.3ol horizontal flexure capacity sv'ths Punching shear capacity of reinforced shotcrete (Reference 1): tt" Dc:= WO+;Dc = 0.896ft VN = 23.5 kip A.=207.4i] AE= 21'6ir2 T4p:= Tpp.crl rh. Vry := 4.rl f".l.psi.zt.D..- 1t o. + tfrr)24.,=l , J.n / o"\2 A":=l--=1.71' \2/ _Vprre:= --1.1(ffiff '-l-s"'q-{ Tpp = 25.1kiP punching shear capacity Ground nail yield capacity (Reference 1): *",= &(?)' Tw = 92'0kiP .n T4y:= Tgy'o1 tensile yield capacity Yenter Companies, Inc. 20300 W. Hwy 72 Arvada, CO 80007 303-27W458 Page 5 of '10 Designed by: l(WB Checked by: llCtll Grout-soil bond capacity of the ground nails (Reference 1): Ty6:= Qrr.D*.n Tn6:= T1-16.o'9 k'ruc = z.:zs 5P grout-soil bond capacity per length of ground nail Summary of ultimate and allowable capacities: tp = 9.2kip earthpressure loading on facing UltimateCapacity ReductionFactorsAllowableCapacity Flexure (vertical) Tvrp = 28.6 kip af = 0.85 Tvar = 24.3 kip Flexure (horizontal) THr.r = 5t.7kip af = 0.85 T}I,{Ir = 43.9kip Punching Shear Tr.p = 25.1kip af = 0.85 Tep = 2l.4kip Tensile Yield Tuy = 92.0kip ot = 0.55 Tay = 50.6kip Grout-Soil Bond lbf cr^ = 0.50 Ta lbfruc=237s? qg=o'50 Tac= ll88 o rrl Graph of the Allowable Stength Distribution along Soil lllafls fo facilitate I nput for Global Stability Analysis (sepante calc ulation) : 50 Yield 40 S Face 8':". 30o tacel-oao tt 20 0"0 5 l0 ts 20 TY,TY,TY,Y feet Gr3ph of the A ouabto stt€ngth Dbtrlbu on to f.clllt te Global stablliv Analysls. Eerth Pros.u6 Faclng Load, Atlouablo l|all Yleld and f Inlmum Allowablo Flclng R€lbtanco a]l plotled lor Infolmatlon only. _. r. t. i. t. t. l0 Yenter Companies, Inc. 20300 W. Hwy 72 Arvada, CO 80007 N+279458 Page 6of10 Designed by: KWB Checked by: MCM tt= 2r.359 22.555 22.555 0 tabulated resistance distribution ftips) per nail (mtst divide by horizontal spacing before inputing into glob al s tab ility pr ogram ' [;t]" min(tt,,tt'tt )t'tinT:= +---.-----..--- -S6 nail lengilh Upper cantilever section: shear: ( n", ') ".'= [; tJ'r" + h.'o56 lbfv"=215-'ft vns = 417q}!! 'n = rsot.t]!! , "Problem!" ) ft mc = 143.1lbf .3 ft mn := Of fiulv 51 Ahs - Ahb Ash := - s" Minimum Area of Steel Required per foot of wall Actual Area of Steel from WWF vertical Check3 := if(A.es > Asv,"Problem!","OK") Chec\ ='66" Actual Area of Steel from \A/WF horizontal Check4:= if(ngs > Ash,"Problem!" ,"OK") Checka = "69' Minimum cover requirements (ACl 318 Sec,tion 7.7 Concrete Ptolection for Reinforcement): th" - Vnr:= 2'i',/ft.l.nsi V := crf Vns Checkl := if(V > v., "OK" Flexure: hc.vc mc:= -----------r---T 3.co{i6) in '2 Aqs:= F6.Rt.ths.l2.- nes = 0.1l9*ft Avs - Avb ) ln Asv = 0.12 -ft ln Ash = 0.12 -ft Asv := Check2 := if(mn > mc, "OK" , "Problem!" ) Reinforced shotcrete reinforcement: Check2 = "Q6" Minimum reinforcement ratio (ACl 318 Section 7.12 Shrinkage and Temperature Reinforcement): For Temperature Rt := 0.0018 minimum ratio of steel reinforcement area to gross concerete area (for Grade 60 steel) Fo := 1.0 Factor to Increase Gross Concrete Area due to Uneveness in Cut Line T = 5.34kip Shear load on section One way unil shear strength of reinforced shotcrete seclion Allowable one way shear strength Checkl =!rOK' mn = 2401.2lbf.I ft Yenter Companies, Inc. 20300 W. Hwy 72 Arvada, CO 80007 30t2794458 Page 7of10 Designed by: l(tlB Checked by: MCM The reinforcement steel in the shotcrete urill have a minimum shotqele cover of 3 in. whicfi meels or exceeds the ACI requirements. Splice requirements for welded wire mesh (ACl 318 Section '12.15 Splices of Deformed Bars and Deformed Wire in Tension): rwv L66:= 0.27.A635'-: Ldb=3ln L6:= 1.5'L66 Ld=4in ..trp'i Splice := rna*(Oin, L6) Splice = 6 in External stability (eccentricity, overturn i n g and bearing capacity) : Bearing capacity factors: (from page 50 of Reference 2) no '= t'n(+s.ar, * {)t..n't*tol Nq = 2g.Z (after Reissner, 1924) Nc = 35.5 (after Prantl, 1921) Nr = 30.2 (after Vesic, 1973) n.:= (No - r).*(O) ttr:= 2.(uo + r).t*(O) l{oto: Bocause all the ground nall watts a|t longer than 5 tlmer the wldth (23 moi.El, the ollglml, ultlmat harlng cep.clty oquatlon dEdvod fol tho pl.no rtraln condldon (cor lnuo6 footlngl ls approprlab. Adlustrnent factors tor iootlng 3hapo, load Incllnatlon and 3lope all not roqulrd. '- x'l -*Xm- -x2_ Figurs 5. Eslablishing th6 base width (looling) end verticsl bgckwEll (horizontal earh pa6$ure) ot thg rolntorced "grav f'wall for sxtomal stabillty c€la]Jlations. -Xm Figur€ 6. Calculate tl|e v'/eighl and moment ams (ftom t@ of wall) for the se\€n blocks comprising the ]einforced "gravity' wall ard th6 horizontal earth pressute ior thg €(6rnal stability calorlations. Xl := (L - l50.mm).cos(in)Xl = 18.84ft X2 = 18.84ft See Figures 5 &6above'X2:= Xl * (H. - tr").sin(i6) Xl+X2Xrn:= :::----: Xm = 18.84ft 2 E * '= rL * (x- - n".tan(i6)).tan(f) Hm = 22.00ft Yenter Companies, Inc. 20300 W. Hwy 72 Arvada, CO 80007 303-279-4458 Page 8 of 10 D$igned by: KWB Checked by: MGll ,n,=l ''t*.n*)2 +l.[(Hm-hw).hw] * (t -t*).n*'l*".? n*2+Hm.o,5 rn=,0.r$2 ' ' 2 l'2 "" ft Hmy=i y=7.3ft Mresist:= Wl'mal + W2'ma2 + W3.ma3 Mresist = a88.2kio.I Resisting moment'ft Movert:= Ph.y Movert = Za.+np.3 Overtuming moment WT:= Wl + W2 + W3 wr=5l.s2En Total weight of "gravi$" wall Mresist - MovertX0:=X0=8ft Br = 16ft Reduced footing width qmax = 3.2 ksf Bearing pressure from gravity wall e = 0.25Eksf Embedment lerm ec = 1.4ft Eccentricity check for overfuming (e should be less than or equal to X6) X6 = 3'l ft ch".k5 := ir(x6 < e", "Eccentric" ,"oK" ) FS6. = l.69 Factor of safety for bearing capacity (should be greater than 2.5) Check6 := if(Fsbc < 2.5, "Problem!" , "OK" ) FSol = 6.56 Factor of safety for overtuming (should be grcater than 2.0) CheckT := if(Fsot < z, "Probleml" , "OK" ) B1 := 2.X0 WTqmax:= t ".r=I--xg-2 XmX6:= -6 qult rsbc := - qmax Mresist 1561 i= - - - Movert A. Nh:= - Nh=0- Su'Sn q:= o.s.n..sin(in).y qult := c.Ns + 0.5.(f - Tw).BrN, + q.tlo qult = 24.6 ksf Ultimate bearing capacity bhf := NU.L bhf = 0 ft shotcrete := 4.tt\ shotcrete = 0 yd3 O, ,= *n[9) W1 := S6.n65.Nb Wn = 0 ft \ 6ft / Wu := 36in.nn6.N6 Wv = 0 ft 5:= ceil(N5) Yenler Companies, Inc. 20300 W. Hwy 72 Arvada, CO 80007 303-2794458 Page 9 of 10 Deeigned by: KWB Checked by: MCltl Height of wall Batter of wall Backslope angle Soil properties Vertical spacing Horizontal spacing Angle of nail Height of cantilever sec'tion Diameier of bar Grade of bar Diameter of hole Length of hole Width of Plate Thickness of Shotcrele VerticalWhaler Horizontal Whalers Surcharge load (horizontal) lmpact factor Nail resistance (for SlopeW) Number of nails Summary Ho=22ft ib=odeg F = odeg $ --32deg c = l00psf T = l25pcf Qr = l2Psi \=sft St=+ft in = 15 deg hc=2ft Dt=to ! = 75tsi Dg = 5'25 in L=20ft wP=8in fts = 5.5in h,=a nvb=2 B=4 nhb=2 osh = 72 Psf f=l T = 5.3 kip N=4 Upper cantilever sec{ion Checkl = "Q6" Check2 = rrQll'l Reinforced shotcrete Check3 = "Of" Checkl = "OK" Extemal stability Check5 = "gK' Check ='OK' Check? ='OK' Faceload E=9.22kip Face capacity Tnu = 2l.359kip Takeoffs a Face area A- = 0 ft- Number of bolts *O = O Total drilling bhf = 0 ft Ultinate Capacity Flexure (vertical) Twr = 28.6kip Flexure (horizontal) Tnnn = 5l.7kip Punching Shear Tpp = 25.1 kip Tensile Yield rw = e2.okip Grout-Soil Bond 1,,,- = 2375 !!l af = 0.85 ctt= 0.85 at= 0.85 at = 0.55 ag = o'50 shotcr€te = 0 yd3 Mesh = "One Layer of 4x4 W4.0xW4.0" Whaler size Dvb = 0.5 in Dt = 0'5in Whaler Lengtn Wn = Oft Wv=Oft Wh+ W=oft Bags of grout Cr, = 0 Reduction Factors Allowable Capacity Tver = 24.3 kiP TP4P = 43.9kiP Tnp = 2l.4kip Tev = 50.6kip rAG = nEs{l Yenter Companies, Inc. 203O0 W. Hwy 72 Arvada, CO 80007 30$279-4458 Page 10of10 .lb Dsl := -' .2ln - lb ^ lb " = looo.tb ksi := looo.!Pst := - pcl := - Klp:= ftz ft3 in2l. Wall Geometry Height of wall Angle of backslope Soil friction angle Soil unit weight Horizontal load 2. Micropiles Distance between MP rows Batter angle of rear MP row Elastic modulus of steel Compressive strength of grout Yield strength for steel bar Yield strength for steel pipe Rebar size Outside pipe diameter Wall thickness of pipe Borehole diameter Spacing 3. Load and Resistance Factors YIa:= I 1lE":= I Yr := I Yt5 := I Yl,:= 0.35 <DEO:= I OFr:= 0.66 (D6:= I H=22ft p := 0.deg g := 32.deg y:= l2Opcf - kipq:= )--ft Front row dl := l2.in <o := 15.deg Er:= 29000.ksi f":= 3000.psi F6r:= 75ksi Fpr:= 35ksi USD:= l0 Dg := Oin tg := Oin b6:= 5.25in S9 := l8in Distance from too to anchor L1:.= 12ft. L2:= Oft. L3:= Oft L4:= Oft L5:= Oft Back row USDI:= l0 D1 := Oin t1 := Oin b1 := 5.25in 51 := 36in Tension (divide bv horizonlal spacinq) T:= 50001b Length of wall L* := Oft Load factor applied to surcharge Earth pressure reduction due to back row of micropiles ( < 1) Moment Reduction (both rows) Reduced Moment in Back Ror Due to Soil Support (additional) Steel Shear Strength Reduction Factor Resistance Factor for passive earth pressure resistance Resistance Factor applied to Flexural Capacity of vertical elements Resistance Factor applied to Ground Nail Facing Capacity (Punching Shear) Yenter Companies, Inc. 20300 W. Highway 72 Aruada, CO 80007 Page 1of7 4. Earth Pressure Flr:= if(ts = 0,F6r,For) F2r:= if(t1 = 0,F6r,FOr) ru ,= "or(g). .o(p)- Ka = 0.307 .o.(p) * xo,= .o(F).*(p) * Kp = 3'zss *(B) - Active Load ru := (o.os.ru.1. H).yr. Pa = 527psf 7E1'25'H = 550ft a:= Pa a = 1.49ft y.(IKp - K") n"1:= f6f nu2:= fo-f R6:= q'fla'ft Passive Load Yp.1 := Ypu2:= Yp6:= ^H 3 g+z! 3 (H+d) 2 Ral = 58001b RaZ = 393 lb Rar = 50001t YRat = 14.67ft YRa2=22.99ft Ynn: = t+'t n Active ep Active ep below mudline Surcharge Pp:= y.(t<o - ru).1a - a;Pp = l666Psf Ynp = 26'o: ftRO:= PO (d - a).ft Yn.:= H+ a+ (d - a).: R^=39221b'.r,..?Y 5. Depth of Embedment Depth of embedment (guess) Sum Moments: (Change d until sum of moments is approximately zero) increase d if moment is positive decrease d if moment is negative (Rur.ynur)+ (n"2.vp"2)+ (n6.vp6)- (*o.t*J - r.(r.1 + L2+ L3 + La + L5) = 0ft.kip 1.0.d = 6.2ft 1.2.d = 7.44ft 1.4.d = 8.68 ft 1.0.d+H=28.2ft 1.2.d + H=29.44ft 1.4.d+H=30.68ft Set user defined embedment depth F,t= Eq Ft = 30ftFI1:= H+ du Yenter Companies, Inc. 20300 W. Highway 72 Arvada. CO 80007 Page 2 ot 7 checked by: 6t25t2007 6. Determine the equivalent steel Area and Moment of Inertia of the composite section for each MP section in the MP shoring wall: Es:= 57000.,,J8T;; Ec = 3.122 x l06psi Elastic (Young's) Modulus for Grout Es n",= f*- nc = 9.289 Modular Ratio no := itfoo = o , USD' lin , D0) *o = 0.625 in outside Pipe Radius\- t6'2) / usor.tin Dr\ Rl := if[Dr =0,-i-,t ) Rr = 0.625in n: := if(nO = o,bo,R0 - to) R3 = 0.625in Outside Grout Radius n+:= if(Rl = o,br,Rl - tr) R4 = o.625in n2,= P.1.;n R2=0.625in OutsideRebarRadius- : v.\t/.J rrr usDrn'z R2l:= ----j'l'in L-Ltl 1L",,=f'lftnola-tn:lal* (R3)'-n2'**rcl r- .-.,,.,,-4 Momentof InertiaandAreaof ' L nc j Ifiont = 0.r2in4 fronl ffi'[il;;#'bection. L - .-..4 --4 I ,o*n'=l.l[t*rta-tn+la]* (R4)'-R2t' **,ol ru".k=0.12in4 back4L- nc 'l l---221 Afront:=^.lLt*olt-(n:)21* (R3)-.-R2- **rzl Afront= t.227inz front Lncl L-221 Aback:= ".1[1*,y'- (R4)2] * (R4)- - R2t- * *,tl Aback= 1.227in2 back t nc 'l Yenter Companies, Inc. 20300 W. Higtvay 72 Arvada. CO 80007 Page 3 ot7 checked by: 6t25t2007 f! + lin\;=-:- N=361lin i := r .. N L. := i'in H= 22ft IIt = 30ft I Aback Q- IS1/\ ,o(. := L..tan\o., + dl c. := - tan(or)=0.26S t Ao-*. Ou-* s1 Ss .,', , ,) Igonl + Afunt.{c.l- I6nsl( + A6acl(.(xx. - c.l- tSosl I.:= IMP.ll oFs.Fly'I. OFs.F2y.t. 1\{ln_:= - \,12n.:= .: ' h t Dryrbc.+- xx.-c.+-r2 ll2 max(Mln) = 367 kip max(M2n) = l83kip Right side loading diagram ^ l. Pn := --9- + | ((.os.x,'y.i.in)) ir l.in - 3 3 11.-i H+ d 1.. ,, 2 I o otherwise Left side loading diagram "r,'= l[r.(q-ro).ti.ir,-(n+a)]] if i.in>H+3 Passiveearthpressure-, l' ' ' I o otherwise Anchor Loads rur := f r if i.in=Lr raz := lr if i.in= L2 t6.:= lr ir i.ln=I-: Pa+,:= lr if i.in=L4 nas := lr if i.in =Ls l0 otherwise l0 othe.*ise l0 other*ise l0 otherwise l0 otherwise Yenter Companies, Inc. Page 4 ol7 20300 W. Highway 72 Arvada. CO 80007 AAVtrNT'trR V:=o^-!Uft for ie l..N o. <- [0.s.(en * h,_,) - (o, * "r,_,)].(",- L,_,)] + D,_, TD.<-D.-OcT if L.=H-Ll D.<-D,-oc.] if L.=H-Lzr l -ft | TD.<-D.-oc.; if L.=H-L3 TD.<-D.-OC'n if L.=H-LC Q<-D,-ocl if L.=H-L5I r -ft l M:= h Do <- lb for ie l..N n, <- [0.s.(v, + v,_,).(t , - L,_,)] * D., D R:= D th R <- 0.=ft ax:= for i e 0..N ifL.>rt ln <- v.IT I lbreak Do € o.* for ie l..N lo -o if Li<Hr lo, * o.t11t* * pR,_,) - (*, * er,_,)].(",- r,_,) ir r. > r4 D R = -20.8e39ft an:= lan AR = {.35a& P:= -PL Mmx:= max(M) Mmx =Z+.l!akip.!6 Maximum (factored) Momeni Mmn:= min(M) Mmn = -106.862 kip Minimum (factored) Moment Yenter Companies, Inc. 20300 W. Highway 72 Arvada, CO 8ff107 Page 5 of 7 AA VtrSflT'trR checked by: 6t2512007 M1n = front row allowable momenl = red line M2n = back row allowable moment = blue line M = applied moment = green line H=22ft. rt=30ft c1 := min(Mln - M) c2 := min(M2n - M) Checkyll := if(ct < -2lb, "Check Front Row. ,'OK') Checky2n := if(c2 < -2lb, "Check Back Row" ,'OK') max(M, Mln, M2n) = 367 YiO max(M) = 24;l04krp ln = "OK" ='OK" l0 Applied & Allowable Moment Diagram \ \ \ I ) L ft c'L.E- ;fto-----Al ft 20 30 0 50 r00 150 200 2so 300 350 400 Mln M2n M kip kip kip Moment (kipiff/ft) Yenter Companies, Inc. 20300 W. Highway 72 Arvada. CO 80007 Page 6 of 7 Acvive earth pressure resultant Number of piles per ft Active force per pile Shear strength of one pile ,"'=$*o "o'= *. i t"o,= ft Pa= r3.e23+ *o=t* Pap = 13.923kiP +,= ,0,.,,, [(#)'.,"{fo = 32.2lakiP fS",= I_ pap FSr = 2.314 Micropiles per foot Number of micropiles Drilling Length of cap tpt,= a + f-51 Ss N*O:= mpf .Le7 bhf := Nmp.It mpf=tl-ft Nmp=o bhf=0ft Lw=Oft Yenter Companies, Inc. 20300 W. Highway 72 Arvada, CO 80007 PageT o17 e V?p,)r*'. ?* " ?ao76 lle 6.s Frvvm'. -[V ^*fur lnfanvnzOqru a9 , ?tnr'. DLl?e' .-L?\LO rr, tz?4$ (Qa*qe'. !g; 1e'ot*: h6 tL" \€,a?u? tvsr^v-f- - GlTr tq"o,1,.6.,DL* t6?op,+ r. LL" zdcut /iLzTi?at C'atet-x wq,ffi: fuy* jL" # v'iSt zy+ I ll t I ! I I 7aaq* ,h'/bo7# (taur.1,72y.l.Nr) --c' , l5ryev tb, Atc,pof H; t l'7-7o+ tf6a + ttg'a z 35?a ''1,'tu,3) ,rJ ,lll,r-vrt 6rlr.l;&1 . 87$7€ lfGU ,la+ h!,= l-hlz't U.t'g Sfyr+r} /t.?o'l.kg+ 16Z+ LL+bb + +4ot, + lt ae * +a4a - 2.t,46L7a* / 25 OH To,vn Square Suite 200 Fort Collint CO 80524 th:970.225.9099 tax,.970.225.6923 PO. Box 1860 79050 US Hwy 40 Wirner Park, C0 80482 th: 970-722.7677 Fax: 970.722.7 679 .t,''c tu PLF ' /a*ry ri;(*'s, /tt4tt7t-F 2:"/,7 65 t* 1319 spruce SM EdrH€{ CO 80302 Phi 303.i144.1951 Fo( 303.444.19t LF,, 7tr1:r+ /,// q 45 , t/, /tur..t:,qt), 1-p:D(t?,0)/,of ,f o =-,*r,l/& . 1rt,+p,y' )'(r_r'),' suif,r /ap t,ht. 7 s,4,u)-rl/ Nu '^ na.)Qa7' f) ., t z oay tf^ / | \F+, /z (/zrytf:1iZt/r:, //r d"fF t # 4a* te,,qrr) 2{F" !eE* /,/,{ro "1, y,li*yLur d,- *'a74r*) ilu: DL /tL+ tfi-e. *r, , ,u{onu r *{7,o * ,r{rn * *{v*- s /r'7! 1t"r> = 3'-r.' /)tDE. / H3 a g6aa pn ,/*on . ,,"f I o" f tlr/ 4 /*l {urtrtt 77,6) = /f t:+7t{ ( rry f) :'tt "7"F * g?af{ / By; b D ll arkd. B),: _ levo: /213\ lrotr..at /tF.tat' cttent: 3ls lJ D Pr€limlnary O Flnal :'or- ilo. { o-u;r) rr7 i7,+tttu5 ,z!c E1€/ 7 trt/ = 762," fL,>of) fuuo //'akf /t,*)t zo*tF l(/n, ze 1ts,*)/a, 5?,Ltr.-f* ,fls , saaTr(r.g'" {,f n ' (L-t!t-b /! Y56- -ttE.k,a-r /<e = rt/tt f74.ae (u) 2,?' fk//a lil ., 35 VenbrCompan:"c 20300 Hwy72 Arvada, CO 8|n07 p 303.279.4i058 f 303.279.t!908 TlEe : Dlgnt: Dcecrlpdon : Scop. : Job t tlNL: 9:37AM, 19 APR 07 Rectangular Concrete Column Descriptaon Cerisola Underpinning 6.000 in in fc Fy Seismic Zone 4,000.0 60,m0.0 p6l otal Height Unbraced Length Efi. tength Factor Cotumn b BRAGEDd=3.000 in 0.000 in LL & ST Loadt Acl SeparatEly Code Ref ACr 3|8{2, 1997 UBG, 2003 BC' 2003 NFPA 5000 Load 'actorins *pports 2003 tBC and 2003 NFPA 5000 by virtue dhsir ls erenc€s to ACI 31&02 fo concrete de8ign. Faaoring of enl€rcd toads to unimste loads wihin thb progrem F according to ACI 318-02 C'2 Doad Loed 1 .000 k 1.400 1.700 1.700 1.1m Llv. Lord 5.800 k S[sdJelEB k 78 0.900 1.300 Ecc€ntrlcltv 2.(X)0 inArLl Lo.dt ActrdkLu/r 53.33: N€utral Arb Dbiance Phi Mar Limit kl/r Be{a - M:suEtained/M:max Cm Et/ 1000 Pc:pi^2Elr(kLuf2 4ha: MarPu / (.75 Pc) Delta Ecc' Ecc Loads + Moments D6ign Ecc = Ecc ' D6lt€ Gl & C-2 DL ACI C.l E G2 LL ACt C-l &G2 ST ....sebmic = ST' : Elastc Modulr3 ACI Eo. C-l 2.7300 in 0.7000 34.0000 0.1u3 0.6000 277.otr 206.67 0.0506 1.(x)00 2.000 2.qn 3,605.0 ksi ACI Eo. C-2 2.7300 in 0.7000 34.0000 1 .0000 0.6000 155.74 166.78 0.0084 1.0000 2.fi'o 2.txto B€Ta ACI Eo. C-3 2.7300 in 0.7000 34.0000 1.0000 0.6000 155.71 r 66.78 0.0072 1.0000 2.000 in 2.1n0 in Goup Factor ACI C-3 Dead Losd Fac'tor ACI C-3 Shotl T€|m Facfc Addl "0.9" Factor tur S€i8mic 12.00 x 6.00in Column, Rebar: 2;f6 @ 3.00in Apdied: Pu: ar Faolorcd Allowable : Pn ' Pfti @ Itelrign Ecc' M-cdlbal Combined Eccenficity Magnificditn Factor De{ign Eccenticity Menified D6(In iroment Po' .80 P: Bal ced Ecc : Balanced ACr C-2 1.0t k 60J7 k 0.17 k-n 2.OCD h 1.@ 2.000 in o.17 k-ft 235.@ k a.77 k 15.757 in Column is OK ACI CA 0.90 k 5037 k 0.15 k-n zoo in 1.00 Z(Do in 0.15 k-n 235.@ k 8.7f k 15.75f in W Ad 318-95 set,on 10.12 & 10.13 ACI Factors (perACl31eO2, applied ifter|ally to entered l€ds) 36oo Datcz 3*-L9-2ffit $naillin 3.10 ?ilc: ccrl'srh I'linimum Factor of Safetv = Z.AL 5.{ ft Dchlnd Uall Crcst At llall f oe H= 8-S ft LEGEIID: IrS= 25.4 lina IryG .$.8 Xsi $h= 4-A ft $rr= 3-5 ft GRr Pllr o0ll slc 1 138:s dil fE[ 'ITi Scale - 16 ft m Surchar.gre 'I FiIe: cerisola *************************************************** * CALIFORNIA DEPARTMENT OF TRANSPORTATION :I * ENGINEERING SERVICE CENTER :T * DIVISION OF MATERIALS AND FOUNDATIONS :T * Office of Roadway Geotechnical Engineering * * Date: 04-t9-2O07- Time: 09:33:28 * **i************************************************ Project Identification - cerisola --- TIALL GEOMETRY VerticaL wall Height = 8.0 ft Wal1 Batter = 0.0 degree Angle Length (Deg) ( Feet ) First Slope from Wallcrest' = 0.0 120.0 Second Slope from lst slope' = 0.0 0.0 Third Slope frohr 2nd slope. = 0.0 0'0 Fourth Slope from 3rd slope. = 0.0 0.0 Fifth Slope from 3rd slope. = 0'0 0.0 Sixth Slope from 3rd slope. = 0.0 0.0 Seventh Slope Angle 0.0 SLOPE BELOW THE WALI., There is NO SLOPE BELOII TIIE TOE of the wall ----- SURCHARGE --------- THE SURCHARGES IMPOSED ON THE SYSTEM ARE: Begin Surcharge - Distance from toe = 0.0 ft End Surcharge - Distance from toe = 3.0 ft Loading Intensity - Begin = 2000.0 psf/ft toading Intensity - End : 2000.0 psf/ft Begin Second Surcharge - Distance from toe = 3.0 ft End Second Surcharge - Distance flom toe = 10.0 ft Loading Intensity - Begin = L920.0 psflft Loading Intensity - End = 1920.0 psf/ft oPTroN #1 --------- Factored Punching shear, Bond E Yield Stress are used. ----- SOIL PARAMETERS Unit Friction Cohesion Bond* Coordinates of Boundary Soil gfeight Angle Intercept Stress xsl YS1 xS2 YS2 Layer (Pcfl (Degree) (Psf) (Psi) (ft) (ft) (ft) (ft) 1 135.0 34.O 100.0 15.0 0.0 0.0 0-0 0.0 * Bond Stress also depends on BSF Factor in Option *5 when enabled. Page - 1 38 Fil-e: cerisola WATER SURFACE --------- NO gfater Table defined for this problenr. SEARCH LIMIT --------- fhe Search L,init is from 0.0 to 16.0 ft You have chosen NOT TO LIMIT the search of faifure pLanes to specific nodes , REINFORCEMENT PARMETERS --------- Nurnber of Reinforcement Leve1 3 Horizontal Spacing = 4.0 ft Diameter of Reinforcement Element = 1.250 in Yield strese of Reinforcement = 45.0 ksi Diameter of Grouted Hole = 4.0 in Punching Shear = 25.0 kiPs (For ALL Levelsl Reinforcement Lengths = 10.0 ft Reinforcement Inclination = 15.0 degrees Vertical Spacing to First Level = 1.0 ft Vertical. Spacing to Rennining Levels = 3.0 ft Page - 2 39 Fi-l,e : cerisof a MINIMUM SAFETY FACTOR Toe 2.257 Reinf. Stxess at MIN IMUM SAFETY FACTOR NODE 2 2.O6'7 Reinf, Stress at MINIMUM SAFETY FACTOR NODE 3 2.015 Reinf. Stress at MINIMUM SAFETY FACTOR NODE 4 2.010 Reinf. Stress at MINIMUM SAFETY FACTOR NODE 6 2.O98 Page - DISTANCE LOVIER FAILURE BEHIND PLANE WALL TOE ANGLE LENGTH(ft) (des) (ft) 1.6 51.3 I-.0 Levet 1 = 15.730 Ksi (puft_out 2 = 1,6.467 Ksi (Pullout 3 = I7.204 Ksi (Pullout DISTANCE LOWER FAILURE BEHIND PLANE WALL TOE ANGLE LENGTH(ft) (des) (ft) 3.2 51.3 1.0 70.4 Level 1 = L3.476 Ksi (Pullout 2 = 1-5.335 Ksi (Pullout 3 = 17.193 Ksi (Pullout DISTANCE LOWER FAILURE BEHIND PLANE I{ALL TOE ANGLE LENGTH (ft) (des) (ft) 4 .8 53.1 4 .0 63.4 Level 1 = 11.196 Ksi (Pu1lout Z - 13.720 Ksi (pullout 3 - t'7 .240 Ksi ( Pullout DISTANCE LOWER FAILURE BEHIND PTANE IilALL TOE ANGLE LENGTH(ft ) (deq1 (ft) UPPER FAILURE PLANE ANGLE LENGTH(des1 (ft) 82-4 '7.3 control-s . . . ) controls. . . ) controfs. . . ) UPPER FAILURE PLANE ANGLE LENGTH (deg) (ft) 't .6 aanr-rnl c \ controls. . . ) contro]s. . . ) UPPER FAILURE PLANE ANGLE LENGTH(des) (ft) 5.4 controls . . . )controls. . . ) controls . . . ) UPPER FAILURE PLANE ANGLE LENGTH(deq1 (ft) 6.4 4'1 .6 7.6 61 .9 Level 1 = 8.637 Ksi (Pullout 2 : 12.82'7 Ksi (Pullout 3 = l-7.031 Ksi (pullout DISTANCE LOWER FAILURE BEHIND PLANE WALL TOE ANGLE LENGTH(ft) (des1 (ft) controls, . , controls. . . controls. . . UPPER FAILURE PLANE ANGLE LENGTH(des) (f t) NODE 5 2.060 8.0 36.9 4.0 49.4 '7.4 Reinf. Stress at LeveL l: 7.348 Ksi (Pullout contro1s...) 2 : 11.338 Ksi (Pullout controls... ) 3 : 16.557 Ksi (Pullout controfs... ) MINTMUM DISTANCE LOWER FAILURE UPPER FATLURE SAFETY BEHIND PLANE PLANE FACTOR WALL TOE ANGLE LENGTH ANGLE LENGTH (ft) (des) (ft) (des) (ft) 8.09 -6 32.0 4 .5 44.2 \' " ' Reinf . stress .. """L; : NODE 7 2.3'73 Lt.2 Reinf. Stress at Level 1- 3.993 Ksi (Pullout controls.. ')2 = 9.191 Ksi (Pullout controls. ' . ) 3 = 16.058 Ksi (Pullout controls' ' ' ) MINIMUM DISTANCE LOTIER FAILURE UPPER FAILURE SAFETY BEHIND PLANE PLANE FACTOR WALL TOE ANGLE LENGTIT ANGLE LENGTH (ft) (deg1 (ft) (deg1 (ft) NODE 82.7L4 72.8 Reinf. Stress at Level 1 =2= 3= 32.0 15.1 89.9 0.0 MINIMUM DISTANCE SAFETY BEHIND FACTOR WALL TOE(ft) NODE 9 3.024 r4.4 Reinf. Stress at Level 1 =2=3- MINIMUM DISTANCE SAFETY BEHIND FACTOR WALL TOE(fr) NODElO 3.307 16.0 26.6 l'1 .9 Reinf. Stress at Level 1 : 1.038 Ksi 2 = 8.493 Ksi 3 : 15.947 Ksi 0.0 controls... controls. . . controls. . . * For Factor of Safety = 1.9* Maximurn Average Reinforcement Working Force:* t 1.84 6 Kips/leve1 * ******************************************************************** 40 3:,3.312 il:i l;Iii:xl !3ttil: : : 16.295 Ksi (Puffout controls. . . MINIMUM DISTANCE LOWER FAILURE UPPER FAILURE SAFETY BEHIND PLANE PTANE FACTOR WALL TOE ANGLE LENGTH ANGLE LENGTH (ft) (des) (ft) (desl (ft) 28 .2 5.1 39.8 8 .7 3.473 Ksi (Pullout controls... ) 9.884 Ksi (Pullout control-s. . . ) 16.295 Ksi (Pullout controls. . . ) LOWER FAILURE UPPER FAITURE PLANE PLANE ANGLE LENGTIT ANGLE LENGTH (des1 (ft) (deg1 (ft) 29.r 16.5 89.9 0.0 2 .212 Ksi (PulLout contro1s...) 9,163 Ksi (PulLout controfs...) 16.11.5 Ksi (Puf]out controls. . . ) LOWER FAILURE UPPER FAILURE PLANE PLANE ANGLE LENGTH A},IGLE LENGTH (des1 (ft) (des1 (ft) 89.9 ( Pullout ( Pul lout ( Pullout ******************************************************************** TOWN OF VAIL 75 S.FRONTAGEROAD VAIL. CO 81657 970-479-2138 Job Address: Location....,: Parcel No...: Legal Description: Project No : 805 POTATO PATCH DR VAIL 805 POTATO PATCH DR. 210106301019 Qrno*rr"Nr oF coMMUNIry oev?op^aBNr NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES ELECTRICAL PERMIT Permit #: EO7-O2ll owNER IJARCI{, S.A, c/o cERrsoLA 805 POTATO PATCH DR VAIIJ co 81657 APPLICANT SCOTTYIS EI,ECTRIC CO. PO BOX 382 MINTURN co 81545 License: 343-E CONTRACTOR SCOTTYIS EIJECTRIC CO. PO BOX 382 MINTURN co 8164s . License: 343-E ISSUED 09t07/2007 wt07/2w7 03/05/2008 09/07 /2007 09/07/2007 Phone:(7]-9) 486-8299 09/07/20o'l Pbone: (7L9) 486-8299 959 FEE SUMMARY 1.t+ttttr+i.r**1.***:*:***:|l,t'}lr**'t{r!**dt:r+*:t++*ir*i++*******:t**:****)* Toal Calculated Fees- ) Additional Fees------ > Total Permit Fer----- > Paymenb---------- > BALANCE DUE.-.--- > Desciption: ADD UNDERGROUND CONDUIT IN POURED WALL FOR ADDED DRJVEWAY LIGHTING. RWIRE AND CONDUIT FOR 2 BOILER UPGRADFS. FISH ROMEX FOR NEW FIREPLACE Valuation: $0.00 Square feet: Electric€l------ > Investigation--- > will cdl-------- > TOTAL FEES-- > Qql tt s0.00 $4 .00 $0.00 Approvals: Itern: 05000 EIJECTRICAI DEPARTI{ENr 09/o7/2OO7 SH Item: 05600 FIRE DEPARTMENI Action: AP CONDITIONS OF APPROVAL Cond: 12 (BI-,DG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPI-,IANCE. DECLARATIONS I hereby acknowledge that I have read this application, filled out in firll the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances ofthe Town applicable thereto. ANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:00 AM - 4REQUESTS FOR INSPECTION STIALL BE MADE TWENTY-FOI,'R ?-7^ o 7 ,--- APPucATroleLL ilor BE AccEprED rF rNcoMpLErlR uNsJ-GNED ^6114^\ Project#: PR,Io?-ooaq [\.\I)e Buitdingpermit#: Oo?- o163. mW €b7. OZ-[f ;i"'g;rffi?*$:*,o-- 75 S. Frontage Rd, Vall, Colorado 81657 CONTRACTOR INFORMATION Elecbical Contractor: 5c"t+Y3 E\as{*rt Q,o, Town of Vail Reg. No.: 3q3-E- Contact Person and Phone #t: Sca*t 0g.rrOson q?a-../ l.-ossfi E-Mail Addrcss:Far#: Conb?ctor Sionafure:_<--=-- .. *--t.-.',...5f\I --'r-< . \h N|\}*"A\r.{{) COIIIPLETE SQ. Fd)TAGE FOR AREA OF WORK AND VALUATION OF WORK (Labor & l,laterials) AMOUNTOF SQ FTIN STRUCTURE: q ELECTRICAL VALUATION: $ 3, 5oo, o o Otrte at 97&328-8&40 or Yisit forPatel# Parcel# Aio to63cl I Arl rob Name: cERtso lq Job Address: ?oS ?"++to P**.il, D".,i e- tegal Descdfion I loB I elocf: I Hting:Snbdivision: otl$J{€nlt'n /,^ c. .,, .oi A Engineer:Address:Phone: Detailed descrifion of work: qOO ,rnO. aw4y.5W9. R.an ,r. qvrD c!6nDui{ Fo- a e.,ure opg,qbe $Tsil g*r-qa+.X.i ifii{.tu WorkClass: New() Mdition( ) Remodelffi Repair( ) TempPower( ) Other( ) WorkType: Interior( ) Eterior( ) BothtrKI Does an EHU exist at this location: Yes ( ) No ( ) TypeofBldg.r Single.tamilyp{ Duplo<( ) Multi-family( ) Commerciat ( ) Restaurant( ) Other( ) No. of Existing Dwelling Units in this building: I No. of Accommodation Units in this building: Is this permit for a hot tub: Yes ( ) No CX);-7 rE f Does a Fire Alarm Exist: Yes (X) No ( ) ll Does a Fire Sprinkler System iG:6(qWT[l [\\ ******************!***********:l*********FOR OFFI( ul( tnl B*b sEP 06 2001 lll ;t USE ONL ?;wiioF VHn-' F:\cdev\FORllS\PERMm\Bui lding\electicaur€rmiLU -23-2005. DOC Page I of 2 ruz3lzws ffi,q::{1, Amendment to the 2002 I{.E.C. Town of Vail Ordinance 4, Series of 2005 o @erhead services are not allowed in the Town of Vail.o Underground services shall be in conduit (F/C) ftom rhe dility transformer to the elecbic meter, main disconnect switch, and to the first elecfical dls0ibution clrcuit breaker panel.o The main disconnect switch shall E rediily awible, andlocatd ne><t to the meter on the o<terior wall of the sfucture. All underground conduits are required to be inspected befiore back-filling the trench.o In multi-family dwelling unib, no electical wirlng or feeder cables shall pass from one unit to another. Common waffs and spaces are exenpto NM Cable (Romo<) an b ud only in singb and multi-famtf durdllngs net exditry 3 tutfs. Tlp IIl,l annot E ud ln any bulHlng mixd with lfue A.B.E EHrIrn &S mtpntu. cr Aluminum a nducfrtssmaller than size #8 are not permitted with the Town of Vail. TOWN OFVAIL ELECTRICAL PER"TIIIT GUIDEUIIES o All installations of exterior hot tubs or spa's require a DRB approwl from planning. This applicaUon will not be accepted without a copy of the DRB approval form attached (if applicable).o If this permit is for installation of an o<terior hot tub or spa on a new elevated platform or deck over 30" above grade, you must also obtain a building permit. o If this permit is for installation of an o<terior hot tub or spa on any o<isting deck or elevated plafform, a structural engineer must review the existing condiUon and veriff that it will support the added concentrated load. Please provide a copy of the structural engineers wet stamped lefrer or drawing with this application.o If this is a remodel in a multi-family buiHing with a homeowners association, a letter of permission from the association is required.o If this permit is for a commercial space, two (2) sets of stamped drawings are required. Eletrial one4ine and pnel *hedulu arc tqufud if lqd is adM or disttbution is alhrcd. I have read and understand the above. Signahrre Date Signed .If you have any questions regarding the above information or have additional questions, please contact tlre Town of Vail Electrical Inspector at970-479-2147. The inspector can be rcached on Monday thru Friday mornings betnreen the hours of 8am and 9am. You may also leave a voice mall and the inspectorwill call you back. F :\cdev\FoRJ'lS\PERJ'1ITS\EUilding\electical-txrmit-l 1-23-2005. DOC Pa{le zot 2 Lrl23l20p/S TOWN OF VAIL 75 S. FRONTAGE ROAD VAIL, CO 81657 970-479-2138 outrrr*T oF coMMUNlrY DEVELortt NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES MECHANICAL PERMIT Permit #: M07-0214 3o1- o\G3 Job Address: 805 POTATO PATCH DR VAIL Status. . . : ISSUED Location.....: 805 POTATO PATCH DR. Applied . . : 09/1212007 Parcel No...: 210106301019 Issued. . : 09/14/2007 Legal Description: -? i?"O -l -OO/1 Expires . .: 0311212008 Project No : owNER LARCH, S.A. O9/72/2OO7 c/o cERrsoLA 805 POTATO PATCH DR VAIL co 81657 APPI-,ICANT WESTERN F]REPLACE SUPPLY, INO7/72/2OO7 PhONC: 568-3760 1685 PAONIA col-,o sPRrNGs, co 80915 PO BOX 570 MINTURN, CO Llcense:323-M CONTRACTOR WESTERN FIREPLACE SUPPLY, INO9/I2/2OO7 PhONC: 65A-3760 1585 PAONIA COLO SPRINGS, CO 80915 PO BOX 570 MINTURN, CO License:323-M Desciption: INSTALL GAS FIREPLACE Valuation: $2,399.91 Fireplace Information: Restricled: # ofcas Appliances: 0 # ofGas Logs: 0 # of Wood Pellet: 0 * * * t )a * l **:t * *:t 'i l' * t Mechanical--> 960. oo Restuarant Plan Review--> go, oo Total Calculated Fees--> $?9,00 Plan Check--> gls. oo TOTAL FEES--'-----------> g?9. oo Additional Fees------> $0.00 Investigation-> go. oo Total Permit Fee-------> S?9.00 Will Call---> g4.0o Payments---------------> $79.00 BALANCE DUE-----> $o. oo + **ltt*tt+l+* l++,i Item: 05100 BUILDING DEPARTMENT 09/1,2/2007 cgunion Action: AP rtem: 05600 FIRE DEPARTMENT CONDITION OF APPROVALCond: 12 (BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CHECK FOR CODE COMPLIANCE. Cond: 22 (BLDG.): COMBUSTION AIR IS REQUIRED PER CHAPTER 7 OF THE 2003 IMC AND SECTION 304 OF THE 2OO3 IFGC AS MODIFIED BY TOWN OF VAIL. \ Cond: 23 (BLDG. ) : BOIILER INSTALLATIO CHAPTER 1"0 OF THE 2OO3 ]MC. Cond: 25 ST CONFORM TO MANUFACTTIRERI TRUCTIONS AND (BLDG.): GAS APPLIANCES SHALL Cond: 29 (BLDG.): ACCESS TO MECHANICAL IMC AND C}IAPTER 3 OF THE 2OO3 Cond: 31 BE VENTED ACCORDTNG TO CHAPTER 5 OF THE 2OO3 TFGC. OF THE 2OO3 (BI-,DG.): BOII-,ERS SHALL BE MOITNTED ON FLOORS OF NONCOMBUSTIBLE CONST. UNLESS LISTED FOR MOUNTTNG ON COMBUSTTBI.,E FLOORTNG. Cond: 32 (BLDG.): PERMIT.PLANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL ROOM PRIOR TO AN INSPECTION REQUEST. Cond: 30 (BLDG. ) : BOILER ROOMS SHALL BE EQUIPPPED WITH A FLOOR DRAIN OR OTHER APPROVED HT.:--l?-1'-:.-T-""::-]'T:"-::-:f:*'-r:::,.'"-':".:,::,:.:-"J--.1l.1l;j;-'i''t:t|l't*,}:t'+'+,|'*:*lltt,t*||*+t't,|l|||'*** DECLARATIONS I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is conect. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the towns zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances ofthe Town applicable thereto. REQUESTS FOR 1NSPECTION SHALL BE MADE TWENTY.FOUR HOURS IN ADVANCE BY TELEPHONE AT 479-2149 OR AT OUR OFFICE FROM 8:OO AM - 4 PM, o S INS o NMU EQUIPMENT MUST COMPI,Y WITH CHAPTER 3 IFGC.. WNER OR CONTRACTOR FOR HIMSELF AND OWNER \ TOWNOFVAIL. COLORADO Statem€nt **** a r i t t * t t i l * t * * * + + t * * * * * *t I * i i * * * * + *+**** { + + + f * * * * * * * * * * I * * t * * * * * ** * * * *** + * * * * * {' * * * * i * * * * statement Nunber: R070001861 Amount: $79.00 09/).4/2o01r2.37 PM Pavment Method:check T|.r i i ' T.a NoEation: *272L/coRY DENISSEN FOR WESTERN FIREPI.,ACE Permit No; VI07 -0214 T)rpe: MECHANICAL, PERMIT Parcel No: 2101- 053 - 0101- 9 SiEe Address: 805 POTATO PATCH DR VAIL Locat.ion: 805 POTATO PATCH DR. Total- Fees: This Payment.:$79.00 TOtAl AIJIJ PMI S : Balance; $79.00 $79.00 $0.00 * *** * t ** * * ** * * *** * * * * * * * * * * * * * * * * * ** *** * * * !t * * * * * * rt* * * * * * f* * * * ** * * * * * * * * * ** * * *******ti* ** **** ACCOUNT ITEM LIST: Account code DescripEion Current Pmts MP 001000031-t_11_00 PF 00100003112300 wc 00100003112800 MECHANICAIJ PERMIT FEES PI,AN CHECK FEES WILL CALL INSPECTION FEE ou. uu 15.00 4 .00 AppucATroN wrLL Nor BE AccEprED rF rNcoMpLErE oR u{+cffil67 , il29 TOV Project #.\_ AA,,^j1 62,* ?il]5i*ln::,ffi i' 1" I - v'! | 970-479-2149 (Inspectlons) 75 S. Frontag€ Rd. Vall, GoJorado 8[,557 Xfi'/ o Mechanlcal Room Dlmenslonso Combustlon Alr Duct Slze and LocaUono Flue, Vent and Gas Une Slze and Locationo Heat Loss @lcs.o EquipmentCut/SpecSheets Permit will not be accepted without the following: Provide Mechanlcal Room Layout drawn,to scale. to Include: 'I VALI'ATION FOR MECHANICAL PERMIT bor & Parcel# JobName: C-yrr-c&a- Ao:cd!--^c,Job Address; gCg fut .h, Rkh Legal Description Lot:Block:Fillng:Subdlvlslon: Owners Name:Address:PlEEtr[VE at\ Engineer:Address:ugne: DeQiled descripUon of work:r0dn I i lt -l-'h T0 tQl f UO ZUU I ul rowN !.E-yalL_- BoilerLocation: Interior( )_Exteriorl ; Other( )Does an EHU exist at this location; Yes ( ) No ( ) Typeof Bfdg: Single-famllykz{Ouptex( ) Multi-family( ) Commercial ( ) Restaurant( ) Other( ) No. of ExisUng Dwelling UniE ln this building:No. of AccommodaUon Units in thls building: No/Type of Flreplac€s.Exlstinq: Gas Apoliances ( ) Gas Loqs ( ) Wood/Pellet ( ) Wood Burnino ( Noflype of FireplacesiProposed: Gas Appliances ( 1) Gas Logs ( ) Wood/Pellet ( ) Wood Burnlng (NOTAUOWED) Is this a conversion from a wood burning fireplace to an EPA Phase II device? Yes ( ) No ( *f f**t*****r************FoR oFFICE USE ONLy********'r*:r.*rr**************** Vr;xB++?elz* /o/'*7, aft I cor i.ttlY oElELft€r{r Dmign Review Board ACTION FORM Department of Community Development 75 South Frontage Road. Vail, Colorado 81657 tel: 970.479.2139 taxj. 979.479.2452 web: www,vailgou.com Project Name: Cerisola Residence Project Description: Participants: owNER |-ARCH, S.A. PO BOX 33,10 VAIL co 81658 License: C000001763 ProjectAddrcss: 805 POTATO PATCH DRVAIL 805 Potato Patch Drive/Lot 29, Block 1, Location: Legal DescripUon: Lot: 29 Blod<: 1 Subdivision: VAIL POTATO PATCH Parcel Number: 2101-063{101-9 Comments: Seeconditions DRB l{umber: DR8070437 Final review of change to approved plans - reduce scope of work from residential addition to the remodel of existing driveway and retaining walls, change driveway material 0812212007 c/o cERIsot-A 805 POTATO PATCH DR VAIL co 81657 APPUCANT SNOWDON AND HOPKINS, ARCHffi0S/2212007 Phone: 970-476-220L Motion By: Second By: Voter Conditions: BOARD/STAFF ACTTOil ACtiON: STAFFAPR Date of Approva,2 09 | 05 12007 Cond: 8 (P|-AN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 0 (PLAN): DRB approval does not constitute a permit for building, Please consult with Town of Vail Building personnel prior to construction activities. Cond: 201 DRB approval shall not become valid for 20 days following the date of approval. Cond: 202 Approval of this project shall lapse and become void one (1) year following the date of final approval, unless a building permit is issued and construction is commenced and is diligently pursued toward completion, Planner: WarrenCampbell DRB Fee Paid: S2O.O0 Changes To The Approved Plans Application for Design Review All projects requiring design rwiew mu* receive approval prior to submitting a building permit application' Please refdr tir ttre submittal requiremenb for the particular approval that is requested. An application for Design Revietv cannot be accepted untii all required information is received by the Community Development Department' The project may also need to be reviewed by the Torrun Council and/or the Planning and Environmental Crmmission. b"lign r"iri.* approval lapses unless a buitding permit is issuedTnd construction com{ences witfiin oneyearoftheapproval. ( PboT-OqUJ n Department of Community Development ' 75 South Frontage Road, Vail, Colorado 81657 teli 970.479.2128 fax: 970.479'2452 web: www.vailgov'com General Information: of the Physical Address: Parcel No.:(Contact Eagle Co. Assessor at 970-328-8640 for parcel no') Zoning: Name(s) of Owner(s): Malling Address: t], rsrer(s) Sign N rrre ot Applicant: F{,:iling Address: E. Type of Review and Fee: O Changes to Approved Plans $20 For revisions to plans already approved by Planning Staff or the Design Review Board. Submittal Requirements: 3 Sets of Plans Addresslng Proiect Changes Signature of Homeowner(s) or Association $s\l o nail Address: Ftcdev\FORMS\Permits\Planning\DRB\drb-change-to-approvedlclans-lloage-05-l 1'2006'doc at*tatl*ill* * * {' *'l' * * t t t * 'l 'l* * * * * 1* * * t * * 'l t{.* * * 'lt | * * * * * {l I * f 't I 't I 't * * f I * 'r {' * r* i * | * * * * * * t * * * * i *l I i I I * TOWN OF VAIL, COLORADO Statement * **** * 't 't | * | * * I * * * * * * * * * '|':t I I i * * * * * * * * ** l' 'l 'l {' 'l' 'l {' 'l ttl t * 'l' 'l 'l 'l 'l * '|t't * 'l**'t'l'* *'l**********,lt'l ttll*t* ***t* Sgatemen! Number: R070001536 Amount: $20,00 Oe/22/200702249 Pl[ Pal'ment, MeEhod: check hit: LT Notatsion: Snovtdon & Hopkins ArchitecCg / ck 825 Pennit, No: DR807043? Type 3 DRB-Chg Eo Appr Plang Parcel No: 2101- 053 - 0101- 9 Sit,E AddTeEE: 805 POTATO PATCH DR VAIIJ IJocat,Lon: 805 Potato Patch Drive /Lr,t 29, Block l, Ahis Pa)menE:$20.00 'l't lf l I I i + ***** *tr*t I i * * I ********** * * lt ttt*lt I I I I *t I I tt * | I i I * i i i I * i I * ACCOIJNT ITEM LIST: Account Code Descript ion DR 00100003L]-2200 DESIGN REVIEW FEES Total FeeE: Total ALL Pmt,s : Balance: $20.00 $20.00 90.00 Current Pmts 20.00 t, J o -rl -l O a Fa-) -4 ,J i9I tr-i I!Fti: l3 T{ iil EiI;ii I ii;tii !tiiiill*l :F!ii.;)if ! titiiiii ii a 6 \; *'sl'# im zo Fz 1! m 1Ot- z '.1' \ -:':r'll'.el Fzzo m $iriiiiiiiiiiii Egiiititlt 9 r)tic F qsP!" e Ei.l 6 i:5t ?i:ii: {3ti!Y5! $ l$ A J ) t Snordon a.d Hoddns . Ard Ects. P.C. P.o. Ed334O 0riJ.r6.a2o1 V|l, C&Eb At65A FA( 47&7a!r f l*ffi] cERtsoLA RESIDENcE - pRoposED DRtvEwAy MoDtFtcAloN.- f--;*1 LOT29, BLOCK 1, POTATO PATCH 5 | lvrrr-,coLoRADo frtn*Vta/r,fm,dEl Design Review Board ACTIOil FORIi Department of Commun ity Development 75 South Frontage Road. Vail, Colorado 81657 tel:970.479.2tr39 fax:970.479.2452 web: www.vailgov.comoomttffi 0EtE nFtC r Prolect Name: Cerisola Res. AddiUon Project Description: Motion By: Second By: Vote: @nditions: DRB Number: DR8070135 FINAL APPROVAL FOR AN ADDMON OF GRFA TO BUILD RETAINING WALL, ELEVATOR IN EXISTING GAMGE, ENI.ARGE THE DGSTING GAMGE TO PARK 3 CARS AND ADD ONE BEDROOM BELOW. BOARD/STAFF ACTION Acdon: STAFFAPR Date of Approvalz 05/0212007 C,ond: I (Pl4N): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond:0 (PLAN): DRB approval does not constitute a permit for building. Please consult wlth Town of Vail Building personnel prior to construction activlties. Cond: 201 Partcipants: owNER I-ARCH, S.A. c/o cERrsoLA 805 POTATO PATCH DR VAIL co 81557 o4l03l20o7 APPUCANT SNOWDON AND HOPKINS, ARCHflE04/03/2007 Phone 970'476-220t PO BOX 33,t0 VAIL co 816s8 License: C000001763 ARCHffiCT SNOWDON AND HOPKINS, ARCHffi04/03/2007 Phonez 970-476-220t PO BOx 33,10 VAIL co 81658 License: C000001763 Proiect Address: 805 POTATO PATCH DR VAIL Location: 805 POTATO PATCH DR. Legal Description: loh 29 Block: l Subdivision: VAIL POTATO PATCH Parcel ]{umber: 2101-063-0101-9 Gomments: SeeConditions DRB approval shall not become valid for 20 days following the date of approval. Cond:202 Approval of this project shall lape and become void one (1) year following the date of final apprwal, unless a building permit is issued and consffuction is commened and is diligently pursued toward completion, Cond: CON0008855 Fire sprinkler system required and shall comply with NFPA 13R(2002) and VFES standards. Cond: CON0008856 Monitored fire alarm sysGm required and shall comply with NFPA 72(2002) and VFES standards. Cond: CON0008860 The applhant shall remove the full kitchen from the addition and show a wet bar design so as to not create a seond unit on the pmperty. This change shall be made at the time of building permit application submittal. Cond: CON0008861 The plat adjusting the propefi line between Lots 29 and 30 shall be submitted on mylar to staff and recorded prior to submittal of building permits. Planner: Warren Campbell DRB Fee Paid: f3(Xl.OO Zone Check Legal descriptiory Address s owner &.itl^ Architect kns Zone district Lot size O, S3 Height Setbacks Proposed use Buildable area Existinq Proposed rotalGRFA q@+wo+Jet!_ Primary GRFA +(425) (675*)= Secondary GRFA +(425) (675")=_ " 675 = 425 credit plus 250 addition Does this rFquest involve a 250 Addition? lf yes, how much of the allowed 250 addition is used with this request? AJD Allowed 1, slll| Total Remainino 65-n _Mu site Coverage )O'L 5,iH:;1 * &4*= 3ts1 )%n ga' 15'./ts'TY (30)@ Front Sides Rear 33 20' 15' 15' ,u,^nl^l?arfto Phone Phone lt'lrosgn Are finished grades less than 2:1 (50%) Ve. X No - Environmental/Hazards 1) percent Stope (< ?lO%) OtBf W' 2) Floodplain 3) Wetlands 4) Water Course Setback.(3O) (50) 5) Geologic Hazards a) SnowAvalanche b) Rockfall /vtdt*, c) Debris Flow Previous conditions of approval (check property file): ls the Property non-conforming? Describe: Lrr"llA a\ro€dLJ r-*Iil* Design Review Checklist Project: tr SURVEY - Spotelevations SITE PLAN Scale Legal description Lot Size Buildable Area Easements Topography 100 yr. flood plain Water Course Setback Environmental Hazards Trees Utili$ locations Scale Building Height Encroachments setualtrsl "r'\\ 'tr{r 'Eaves / Overhangs (4") Decks / Balconies Garage connection Site Grade / Slope Retaining Walls ( ".. Scale . .', EHU tr BUILDING ELEVATIONS' .' Scale Color / Materials Roof Pitch Existing trebs MISCELLANEOUS' . iop'doApproval -a',i! GRFA . r. _ l.a{e. \i,r. :t tl + 250 additionalGRFA Crawl / Attic Space t -..1 l' tr Title report (A&B) Utilitv verifi cation form -.:.-,- Photos of site -r Buildino material samples ,v,..., - -1..r '.lj..(. C.O. Verification Sun / Shade Angles Utilities (underground) View Corridors Variances Plat restrictionsParking / Garage Turning Radius :'j;' )D';t': way (accdJgani draoe) i. -,..$now Storage -' 1 ' r .'' "Fire Access . . a ' ril r' .' ,t'-' t' I i . i.1 < Additions-Residential or Commercial Application for Design Review walls, etc. $20 For ievisions to plans already approved Review Board. No Fee Department of Community Development 75 South Frontage Road, Vail, Colorado 81657 tel: 97 0.479.2139 tax: 970.479.2452 web: www.vailgov.com General Information: Ali projecls requiring design review must recelve approval prior to submitting a building permit application. Please refer to the submittal requirements for the pafticular approval that is requested. An application for Design Review cannot be acrepted untll all required information is received by the Community Development Department. The project may also need to be reviewed by the Town Council and/or the Planning and Fnvironmental Commission, Design review apProval lapses unless a buitding permit is issued and construction commences within one year of the approval' Physical Address: Pa rcel No.:Assessor at 970-328-8540 for parcel no.) Name(s) of Owner(s):4, Mailing Addressl il, Owner(s) Signature(s): Narne of Applicant: Mailing Address: v rrt G, 3 o Type of Review and Fee: n S;gns I Conceptual Review n New Construction K acdition n l'linor Alteration ( multi-family/commercial) n Minof Alterauon {single-famllY/duPlex) D Changes to ApProved Plans tl Separation Request $50 gUS $1.00 per square foot of total sign area' No Fee $650 For construction of a new building or demo/rebuild' igOO For an addition where square footage is added to any residential or .o.rnut.iuf Ouifaing (includes 250 additions & interior conversions)' $250 For minor changes to buildings and site improvements' such as' iurooRng, pain-ting, window- additions, landscaping' fences and retaining walls, etc. $20 For minor changes to buildings and site improvements' such as' reroofing, painting, *inao"- additions, landscaping' fences and relaining by Planning Staff or the Design (Contact Eagle Co. Zoning: Pa,.re 1of L2104/78104 {'++tl'**'}*********++++**************++*+++t********+*******a+************+*+**************+** TOWNOFVAIL, COLORADO Statement *+*++i+t**'ll'r*********+++*t+++r********************'i******{'+*****{'*l+f++***+********+***'1*'t{. Statement Number 3 R070000400 Amount: $300.00 04/03/2OO7O1 :23 PM Palment Method: Check HOPKINS Init: iIS Notation: 793/SNOYIDON $300.00 ********:t*+*t+**'itr************************f,***l'*!t**it'irtrt'tt*++***+***********++************** ACCOIJNT ITEM LIST: Account Code Current Pmts DR 00100003LL2200 DESTG1N REVTEW FEES 300.00 Permit No: DRBO70135 TlTre: DRB - Addit.ion of GRFA Parce1 No: 2101-053 - 0101-9 Site Addrees: 805 POTATO PATCH DR VAIII Irocation: 805 POTATO PATCH DR. Tota1 Fee6: Tota1 ALIr Pmts ! Balance: Descript,ion Thie Payment.: $300.00 $300.00 $o. oo PROPOSED LANDSCAPING Botanical Name Common Name PROPOSED TREES AND SHRUBS EXISTING TREES TO BE REMOVED Size ------'f----- | ln'- ll' 4''4t' ta Minimum Requirements for Landscaping:Deciduous Trees - 2" C:,liPer Coniferous Trees - 6' in height Shrubs - 5 Gal. Tvoe Square Foolaqe GROUND COVER SOD SEED IRRIGATION TYPE OF EROSION CONTROL wMF aFM*s+ 1trh 'rb utrr& 6\qnflb $alwrtNa Please speciry other landscape features (i.e. retaining walls, fences, swimming pools, etc.) F: \cdev\FORMS\Permits\Planning\DRB\drb-addiUon-1-25-2007.doc Page 8 of 14 ru23l20os Buildino Materials PROPOSED MATERIALS Tvpe of Material Color Roof Siding Other Wall Materials Fascia Soffits Windows Window Trim Doors Door Trim Hand or Deck Rails Flues Flashing Chimneys Trash Enclosures Greenhouses Retaining Walls Exterior Lighting Other Notes: (p*7 rp u#v+ nvr<Tt tlb NA aW.(W. rt.hD (r' P|easespeciffthemanufacturer,sname,theco|ornameandnumberandattachaco|ordtip' To tltw* exsfl*a F:\cdev\FoRMs\PermiE\Planning\DRB\drb-addition-1-25-2007'doc Page 7 of 14 trl73lzoos American land Title Association Commitment - 1982 TITLE INSIJRANCE COMMITMEI{T BY stewart r title guaranty company Order Number: 6038331 We agree to issue policy to you according to the t€rms of the Commitment. When we show the policy amount and your name as the proposed insured in Schedule A, this Commitment b€comes effective as of the Commitment Dat€ shown in Schedule A. If the Requir€ments shown in this Commitment have not be€n met within six months after the Commitment Date, our obligation under this Commitment will end. Also, our obligation under this Commitment will end when the Policy is issued and then our obligation to you will be under the Policy. Our obligation under this Commitment is limited by the following: The Provisions in Schedule A. The Requirements in Schedule B-1. The Exceptions in Schedule B-ll. The Conditions on Pase 2. This Commitment is not vatlo ittrout SCHEDLLE A and Sections I and II of SCHEDULE B. THIS COMMITMENT IS NOT AN ABSTRACT. EXAMINATION, REPORT OR REPRESENTATION OF FACT OR TITLE AIID DOES NOT CREATE AND SIIALL NOT BE THE BASIS OF A}{Y CLAIM FOR NEGLIGENCE, NEGLIGENT MISREPRESENTATION OR OTHER TORT CLAIM OR ACTION. THE SOLE I,IABILITY OF COMPANY AND ITS TITLE INSURANCE AGENT SHALL ARISE UNDER AND BE GOVERNED BY PARAGRAPII 4 OF TEE CONDITIONS. IN WITNESS WHEREOF, Stewart Title Guaranty Company has caused its corporate name and s€al to be hereunlo affixed by its duly authorized officers on the date shown in Schedule A. stenruart r tdro gua.anty co.npany Countersigned: Stewart Title of Colorado - Vail Division 97 Main St., Suite W-201 Edwards, CO 81632 Order Number: 6038331 l of 2 Commitn€nt - 235 WO Dsclosure COMMITMBNT F1OR TITLE INSURANCE SCHEDULEA l. Effective Date: November 27,2006 at 8:00 a.m. 2. Policy or Policies To Be Issued: COUNTY OFEAGLE STATE OF COI,ORADO. Purported Address: 807 Potato Patch Drive Vail. Colorado 81657 STATEMEI{T OF CHARGES These charges are due and payable before a Policy can be issued: PREMIUM: Mortgage: $100.00 Order No: 6038331 Amount of Insurance (a) A.L.T.A. Owner's Proposed Insured: TO BEDE-TERMINED (b) A.L.T.A. Loan (Standard) 3. The estate or interest in tle land described or referred to in this Commifinent and covered heein is: Fee Simple 4. Title to the Fee Simple estate or interest in said land is at the effective date hereof vested in: lnt29: LARCH. S.A.. A PANAMANIAN CORPORATION I.ot 3O: CALUME'I HOLDINGS, S.A., A PANAMANI,AN CORPORATION 5. The land referred to in this Commitment is described as follows: I-0TS 29 and 30, BIOCK 1, VAIUPOTATO PATCH, According to the plat recorded March 5, l974in Book 233 at Page 629 as Reception No. 1295n - STEWART TITLE COMMITMENT FOR TITLE INSIJRANCE SCIIEDIILE B-Section I REQUIREMENTS Order Number: 6038331 The following are the requirements to be complied with: l. Payment to or for the account of the grantor(s) or mortgagor(s) of the full consideration for the estate or interest to be insured. 2. hoper instrumen(s) creating the estate or interest to be insured must be executed and duly filed for record, to wit: 3. This report is for informational purposes only. No policy will be issued. STEWART TITLE GUARANTT COMPATIY CqnmiErcnt - Sch€dulc B I PaqeIdI Onler Noder: 6038331 , COMMITMENT F1OR TITLE INSURANCE SCHEDULEB-Section2 EXCEPTIONS Order Number: 6038331 The policy or policies to be issued will contain exceptions to the following unless the same are disposed of to the satisfaction of the Company: 1. Rights or claims of parties in possession, not shown by the public records. 2. Easements, or claims of easements, not shown by the public records. 3. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, or any facts, which a correct survey and inspection of the premises would disclose, and which are not shown by the public records. 4. Any lien, or right to a lien, for services, labor or material heretofore or hereafter furnished, imposed by laws and not shown by the public records. 5. Defects, liens, encumbrances, adverse claims or other matters, if any, created first appearing in the public records or attaching subsequent to the effective date hereof, but prior to the date the proposed insured acquires of record for value the estate or interest or mortgage thereon covered by this commitment 6. Unpatented mining claims, reservations or exceptions in patents, or an act authorizing the issuance thereof; water rights, claims or title to water. 7. Any and all unpaid taxes and assessments and any unredeemed tax sales. 8. The effect of inclusions in any general or specific water conservancy, fire protection, soil conservation or other district or inclusion in any water service or street improvement area. 9. Reservations or exceptions in Patents, or in Acts authorizing the issuance thereof, including the reservation of a right of way for ditches or canals constructed by the authority of the United States, as reserved in United States Patent recorded August 15, 1935 in Book 93 atPage2i78. 10. Restrictive Covenants recorded March 5, 1974in Book 233 at Page 628 as Reception No. 129526 and as amended in instrument recorded September 24, l9l5 in Book 241 at Page 950 as Reception No. 138069. 1 1. All matters shown on the plat of VaiVPotato Patch, recorded in Book 233 atPage 629 as Reception No. 129527. 12. Easement Deed dated August 6, l98l recorded at Book 327,Page 614 as Reception No. 223n6. (The above items affect both l-ots 29 and 30) STEWART IITLE GUARANTY COMPANY Commihn€nt - Schedul€ B 2 Page I of 2 Order N!|$er: 6038331 13. A Deed of Trust dated February 18,lgy2,executed by S.A. Iarch, a Panamanian Corporation, to the Public Trustee of Eagle County, to secure an indebtedness of $4O0,000.(X) in favor of California Commerce Bank recorded December 28, 1993 in Book 628 atPage 668 as Reception No' 5?4729' 14. A Deed of Trust dated November 9, 1999, executed by larch, S.A., a Panamanian Corporation, to the Public Trustee of Eagle County, to secure an indebtedness of $1,fi[,fi)0.00 in favor of California Commerce Bank recorded December 28 ,1999 as Reception No. 7189i2. (Ihe above items affect Lot29) STEWART TITLE GUARANTY COMPANY Commitnent - Schcdule B 2 Plge 2 d2 Otder Number: 6038331 DISCLOSURBS Pursuant to C.R. S. I 0- I I - I 22, notice is hereby given that: A. THE SUBJECT REAL PROPERTY MAY BE LOCATED IN A SPECI-AL TAXING DISTRICT; B. A CERTIFICATE OFTAXES DUE USTING EACH TAXING JURISDICTION SHALL BE OBTAINED FROM THE COUNTY TREASURER OR THE COUNTY TREASURER'S AUTHORZED AGENT; C. INFORMATION REGARDING SPECI.AL DISTRICTS AND THE BOUNDARIES OF SUCH DISTRICTS MAY BE OBTAINED FROM THE BOARD OF COUNTY COMMISSIONERS, THE COUNTY CLERK AND RECORDER. OR THE COUNTY ASSESSOR NOTE: Colorado Division of Insurance Regulations 3-5-1, Paragraph C of Article VII requires that "Every title entity shall be responsible for all matters which appear of record prior to the time of recording whenever the title entity conducts the closing and is responsible for recording or filing of legal documents resulting from the transaction which was closed." hovided that Stewart Title of Colorado - Vail Division conducts the closing of the insured transaction and is responsible for recording the legal documents from the transaction, exception number 5 will not appear on the Owner's Title Policy and the lender's Title Policy when issued. NOTE: AfFrrmative Mechanic's Lien hotection for the Owner may b available (typically by deletion of Exception No. 4 of Schedule B, Section 2 of the Commitment from the Owner's Policy to be issued) upon compliance with the following conditions: A. The land described in Schedule A of this commifinent must be a single-family residence, which includes a condominium or townhouse unit. B. No labor or materials have been fumished by mechanics or materialmen for purposes of construction on the land described in Schedule A of this Commitment within the past 6 months. C. The Compny must receive an appropriate afFrdavit indemniflng the Company against unfiled Mechanic's and Materialmen' s Liens. D. The Company must receive payment of the appropriate pr€mium. E. H there has been construction, improvements or rnajor repairs undertaken on the property to be purchased, within six months prior to the Darc of the Commitrnent, the requirements to obtain coverage for umecorded liens will include: disclosure of certain construction information; financial inforrmtion as to the seller, the builder and/or the contractor; payment of the appropriate premium; fully executed Indemnity agreements satisfactory to the company; and, any additional requirements as may be necessary after an examination of the aforesaid inforrmtion by the Company. No coverage will be given under any circumstances for labor or rnaterial for which the insured has contracted for or agreed to pay. NOTHING HEREIN CONTAINED WILL BE DEEMED TO OBLIGATE THE COMPANY TO PROYIDE AT{Y OF THE COVERAGES REFERRED TO HEREIN. I]NLESS TIIE ABOVE COI{DITIONS ARE FT]LLY SATISFIED. Stewart Title of Colorado - Vail Division Flle Number: 6038331 MII{ERAL DISCLOSURE Order No: 6038331 To comply with the provisions of C.R.S. lG.l1-123, the Company makes the following disclosure: (a) That there is recorded evidence that a mineral estate has been severed, leased or otherwise conveyed from the surface estate and that there is a substantial likelihood that a third party holds some or all interest in oil, gas, other minerals, or geothermal energt in the property; and (b) That such mineral estate may include the right to enter and use the property without the surface owner's permission. NOTE: THIS DISCL(NIJRE APPLIES ONLY IF SCIIEDIJLE B' SECTION 2 OF TIIE TITLE COMMITMENT IIER.EIN INCLUDES AN EXCEPTION F1OR SEVERED MINERALS. St€wa.rt Title of Colomdo - Vail Dvision File Number: 6038331 Mineral Disclosure Privacy Policy Notice PURPOSE OF THIS NOTICE Title V of the Gramm-t each-Bliley Act (GLBA) generally prohibits any financial institution, directly or through its affiliates, from sharing nonpublic personal infonnation about you with a nonaffiliated third party unless the institution provides you with a notice of its privacy policies and practices, such as the type of information that it collects about you and the categories of persons or entities to whom it may be disclosed. In compliance with the GLBA, we are providing you with this document, which notifies you of the privacy policies and practices of Stewart Title Guaranty Company and Stewart Title of Colorado - Vail Division. We may collect nonpublic personal information about you from the following sources: . Information we receive from you, such as on applications or other forms.. Information about your transactions we secure from our files, or from our affiliates or others. . Information we receive from a consumer reporting agency.. Information that we receive from others involved in your transaction, such as the real estate agent or lender. Unless it is specifically stated otherwise in an arnended hivacy Policy Notice, no additional nonpublic personal information will be collected about you. We may disclose any of the above information that we collect about our customers or former customers to our affiliates or to nonaffiliated third parties as p€rmitted by law. We also may disclose this information about our customers or former customers non affiliated companies that perform services on our behalf. WE DO NOT DISCLOSE AI.IY NONPUBLIC PERSONAL INFORMATION ABOUT YOU WITH ANYONE FOR ANY PURPOSE THAT IS NOT SPECIFICALLY PERMITTED BY I-AW. We restrict access to nonpublic penonal information about you to those employees who need to know that information in order to provide products or services to you. We maintain physical, electronic, and procedural safeguards that comply with federal regulations to guard your nonpublic personal information. Some states give you the right to access and correct nonpublic personal information. You may contact us in writing at out Home Office, if your state law gives you this right. Pcviccd 6/O5 2. 3. 4. CONDITIONS 1. DEFINITIONS (a) "Mortgage" means mortgage, deed of trust or other security instnrment. (b) "Public Records" means title records that give constructive notice of matters affecting your title - according to the state statutes where your land is located. LATER.DEFECTS The Exceptions in Schedule B - Section lI may be amended to show any defects, liens or encumbrances that appear for the first time in the public records or are created or attached between the Commitment Date and the date on which all of the Requirements (a) and (c) of Schedule B - Section I are met. We shall have no liability to vou because of this amendment. EXISTINGDEFECTS If any defects, liens or encumbrances existing at Commitment Date are not shown in Schedule B, we may amend Schedule B to shown them. If we do amend Schedule B to show these defects, liens or encumbrances, we shall be liabte to you according to Paragraph 4 below unless you knew of this information and did not tell us about it in writing. LIMITATION OF LIABILITY Our only obligation is to issue to you the policy refened to in this Commitment when you have met its Requirements. If we have any liability to you for any loss you incur because of an error in this Commitment, our liability will be limited to your actual loss caused by your relying on this Commitment when you acted in good faith to: Comply with the Requirements shown in Schedule B - Section I. or Eliminate with our written consent any Exceptions shown in Schedule B - Section II. We shall not be liable for more than the Policy Amount shown in Schedule A of this Commitment and our liability is subject to the terms of the Policy form to be issued to you. 5. CLAIMS MUST BE BASED ON THIS COMII{ITMENT Any clai4 whether or not based on negligence, which you may have against us concerning the title to the land must be based on this Commitment and is subject to its terms. Order Number: 603&i31 2 of 2 Commihnent - 235 W,/O Dsclcurc W on comments I sent last 1 From: Pam Hopkins <phopkins@vail.net> To: Warren Campbell <WCampbell@vailgov.com> Date: 041192007 6:13:24PMSubject Re: How are we coming on addressing my comments I sent last week? Hi Wanen, The easiest for us is to take the stove out and make a nicer wet bar, with a smaller refrigerator. We will also take the island out. I will be back on Monday April 30. Hopefully by then we will have solved the TOV FD issues and we can submit for a building permit. And have DRB approval. Thanks for lour help, Pam On 4l19lo7 4:36 PM, '\A/arren Campbell" <WCampbell@vailgov.com> wrote: > I sent this last Thursday. > Pam. > I am performing my review and will send you any comments I generate. I > knorv the Fire Department is doing their reviewing as I spoke to them > yesterday. I believe JR Rulapaugh may have contacled you already with > several questions. > Public Works and I are having a major problem with the construction of > a second dwelling unit on the property. The proposal to build a full > kitchen really affects your parking demands and circulation in the > driveway. Because you are proposing a second dwelling unit you must > identiff that you can meet the required parking for each unit. > Primary Unit is required - 4 spaces required (5,459 s.f.) > Secondary unit is required - 2 spaces required (1,118 s.f.) > The required parking for each unit cannot block the required parking > for the other unit. > The fact that the proposed garage is internally connected to be one > large garage means that the three cars in there go to the primary unit. > I see the only possible solution to being able to meel your parking > reguirement as putting in a separation wall in the garage to create a > one car garage for the secondary unit with its second parking space > being located right behind the garage door. This will obviously mean > you can't use a two car sized garage door. This design would allow for > each side of the duplex to have half its required parking located within > the garages and the other half located directly behind the garage doors. > This is just my suggestion. You may have another solution. > Please show turning movements on the revised site plan to demonstrate > compliance with the parking requirements. > Please only submit those pages which pu revise to meet the parking > requirement. > | will be out of Town till next Thursday. I still intend to staff > apprve lour application as long as compliance withthe parking standardq > can be met. > Regards > Warren >>>> Pam Hopkins <phopkins@vail.neF 04/19/2007 4:31 PM >>> > | did not reiceive them. I have looked in deleted, received and junk > and the > last email from 1ou, besides today is April 3. > On 4l19lo7 4:20 PM, 'Warren Campbell" <WCampbell@vailgov.com> wrote: >> Did you get myemail? lfonvarded the email lsent lastThursday. >>>>> Pam Hopkins <phopkins@vail.net> 04/19/2007 1 1 :35 AM >>> >> Welcome back. >> I did not see your comments. Where? >> Pam >> | am leaving tomonow for a week. lf you could get them to me today, >> it >> vrould be great Thanks >> On 4l19lO7 10:17 AM, 'Warren Campbell" <WCampbell@vailgov.com> > wrote: >>> Pam, >>> | am back in the office and just wanted to check on your progress >>with >>> addressing my commenls. Let me know if I can help in away. >>> Thanks >>> Warren >> Pamela W. Hopkins, AIA >> Snowdon and Hopkins Architects, PC >> PO Box 3340 >> Vail, CO 81658 >>970.476.2201 >> 970.476.7491 lax >> Pam@SnowdonHopkins.com > Pamela W. Hopkins, AIA > Snowdon and Hopkins Archilests, PC > PO Box 3340 > Vail, CO 81658 > 970.476.2201 >970.476.7491 lax > Pam@SrowdonHopkins.com Pamela W. Hopkins, AIA Snowdon and Hopkins Architests, PC PO Box 3340 Vail, CO 81658 970.476.2201 970.476.7491tax l%m@Snol.donHopkins.com GC:Tara Parks <tara@boulderarchitect.us> fr+'|Won,l*>1 Planning and Environmental Commi$on ACTIOI{ FORlrl Department of Community Development 75 South Frontage Road. Vail, cololado 81657 tel: 970.479.2139 fdx:,919.479,2452. web: www,vailgov.comoo*tntw cEvElcEl{t Proiect Name: Cerisola Exemption Plat Project Description: PEC Number: PE@70008 Request for an amended final plat for Lots 29 and 30, Block 1, Vail Potato Patch. The exemption plat exchanged equal sized parcels of land between the two lots to facilitate a new addition and retaining wall. Participants: OWNER LARCH, S.A. c/o cERIsor-A 805 POTATO PATCH DR VAIL co 81657 0L12912007 APPUCANT SNOWDON AND HOPKINS, ARCHTE01/29/2007 Phone: 970-476-220L PO BOX 33,+0 VAIL co 81658 Ucense: C000001763 ARCHITECT SNOWDON AND HOPKINS, ARCHIIE01/29/2007 Phonq 970-47 6-270L PO BOX 3340 VAIL co 81658 License: @00001763 ProjectAddress: 805 POTATO PATCH DRVAIL Location: 805 POTATO PATCH DR. Legal Description: Lot: 29 Block 1 Subdivision: VAIL POTATO PATCH Parcel Number: 2101-063-0101-9 Comments: See@nditions BOARD/STAFF ACTION Motion By: Second By: Vob: Conditions: Kjesbo Jewitt 5-0-0 Action: APPROVED Date of Apprcvalz 0312612Q07 Cond:8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate review committee(s). Cond: 300 PEC approval shall not be not become valid for 20 days following the date of approval. Cond: 113 All darelopment applications submitted to the Town after the effective date of Ordinance 26, Series 2005 shall be subject to the pending employee housing regulations in whatever form they are finally adopted; provided, however, that if the Town fails to adopt the pending employee housing regulations by April 15,2007, this Ordinance shall not apply to such development applicaUons. @nd: CON0008798 The applicant and his successors and assigns, shall not be permitted to request any varianes subsequent to the apprwal of this amended final plat for Lots 29 and 30, Block 1, Vail Potato Patch, on the basis that the resulting approved plat created a physical hardship for developing these lots. Planner: Warren Campbell PEC Fee Paidr $650.00 TO: FROM: DATE: SUBJECT: MEMORANDUM Planning and Environmental Commission Community Development Department March 26,2007 A request for a final review of an amended final plat, pursuant to Chapter 12- 12, Exemption Plat Review Procedures, Vail Town Code, to allow for a modification to shared property boundaries, Lots 29 and 30, Block 1, Vail Potato Patch, located at 805 and 807 Potato Patch Drive, and setting forth details in regard thereto. (PEC07-0008) Applicant Pedro Cerisola/Larch S.A., represented by Snowdon and Hopkins Architects, P.C.Planner: Wanen Campbell il. SUMMARY The applicant, Pedro Cerisola, represented by Snowdon and Hopkins Architects, are requesting approval of an amended final plat, pursuant to Chapter 13-12, Exemption Plat Review Procedures, Vail Town Code, to allow for a modification to shared property boundaries, Lots 29 and 30, Block 1, Vail Potato Patch, located at 805 and 807 Potato Patch Drive. The purpose of the proposed plat is to reconfigure the shared property line between Lots 29 and 30 to facilitate a garage and residential addition to the west side of the existing residence on Lot 29. The proposed final plat results in the exchange of equal sized portions from each lot to the other lot resulting in no change in overall size to either lot. The area to be exchanged measures approximately 1,086 square feet. Staff is recommending approval, with a condition, of this application subject to the findings and criteria outlined in Section Vlll of this memorandum. DESCRIPTION OF REQUEST The applicants, Pedro Cerisola, represented by Snowdon and Hopkins Architects, are requesting to modify the shared property line between Lots 29 and 30. The purpose of the proposed plat is to reconfigure the shared property line between Lots 29 and 30 to facilitate a garage and residential addition to the west side of the existing residence on Lot 29. The proposed reconfiguration of the shared lot line resufts in Lot 29 maintaining its size of 23,422 square feet and Lot 30 maintaining its size of 17,730 square feet. lf this application is approved, the applicant will be submifting a design review application for an addition to the existing residence on Lot 29. A vicinity map is attached depicting the subject property (Attachment A), as is a reduced copy of the proposed plat (Aftachment B). III. BACKGROUND Lots 29 and 30, Block 1, Vail Potato Patch, were annexed into the Town by Ordinance 8, Series of 1969, which became effective on August 23, 1969. The existing structure on Lot 29 was approved by the Design Review Board on June 6, 1990. There have been no applications to perform any work on this lot since construction of the home. Lot 30 is currently vacant. IV. ROLES OF REVIEWING BOARDS Plannino and Environmental Commission: Action: Pursuant to Section 13-12-3C, Review and Action on Plat, Vail Town Cod, the Planning and Environmental Commission is responsible for final approval, approval with modifications, or denial of the final plat. Desiqn Review Board: Action: The Design Review Board has no review authority on an exemption plat, but must review any accompanying Design Review Board application. Town Council: The Town Council is the appeals authority for an exemption plat review procedure in accordance with Sub-section 13-3-5C, Council May Appeal, Vail Town Code. Staff: The staff is responsible for ensuring that all submittal requirements are provided and plans conform to the technical requirements of the Zoning Regulations. The staff also adMses the applicant as to compliance with the design guidelines. Staff provides a staff memo containing background on the property and provides a staff evaluation of the project with respect to the required criteria and findings, and a recommendation on approval, approval with conditions, or denial. Staff also facilitates the review process. V. APPLICABLE PLANNING DOCUMENTS TITLE 13, VAIL TOWN CODE: SUBDIVISION REGULATIONS (partial) 13-2-2 DEFINITIONS DGMPTION PIAT: The platting of a portion of land or property that does not fall within the definition of a "subdivision", as contained in this section. 13-12 EXEMPTION PLAT REVIEW PROCEDURES 13-12-1: PURPOSE AND INTENT: The purpose of this chapter is to establish criteria and an appropriate review process whereby the planning and environmental commission may grant exemptions from the definition of the term 'subdivision" for properties that are determined to fall outside vt. the purpose, puruiew and intent of chapters 3 and 4 of this title. This process rc intended to allow for the plafting of property where no additional parcels are created and conformance with applicable provisions of this code has been demonstrated. 13-12-2: EXEMPTIONS lN PROCEDURE AND SUBMITTALS: 'Exemption P/ats', as defined in section 13-2-2 of this title, shall be exempt from requirements related to preliminary plan procedures and submittals. Exemption plat applicants may be required to submit an environmental impact repoft if required by title 12, chapter 12 of this code. 13-12-3: PLAT PROCEDURE AND CRITERIA FOR REVIEW: C. Review And Action On Plat: The planning and environmental commission shall review the plat and associated materials and shall approve, approve with modifications or disapprove the plat within twenty one (21) days of the first public hearing on the exemption plat application or the exemption plat application will be deemed approved. A longer time period for rendering a decision may be granted subject to mutual agreement between the planning and environmental commission and the applicant. The criteia fw reviewing the plat shall be as contained in section 13-3-4 of thistitle. SURROUNDING LAND USES ANDZONING vil.SITE ANALYSIS The following is a zoning analysis of Lots 29 and 30, which are proposed to be amended by the proposed application. The purpose of this analysis is to provide a comparison of the existing lots to the proposed lots. Lot 29, Block 1, Vail Potato Patch Zoning:Primary/Secondary District Land Use Plan Designation: Low Density Residential North: East: West: South: Current Land Use: Develooment Standard Lot Area: Dimension: Frontage: GRFA: Land Use Residential Open Space Residential Open Space Zoninq Primary/Secondary District Outdoor Recreation District Primary/Secondary District Outdoor Recreation District Single Family Residence Allowed Existinq Proposed 15,000 s.f. 23,422s.t. 23,422 s.f. (no change) 80'X80'min. 100'X100' 130X130' 30ft. min. 147.22ft. 195.73ft. (+48.51ft.) 7,596 s.f. 7,596 s.f. (no change) Access:The access is taken off of Potato Patch Drive. Lot 30, Block 1, Vail Potato Patch Zoning:Primary/Secondary Land Use Plan Designation: Low Density Residential Cunent Land Use: Vacant Develooment Standard Allowed Existinq Lot Area: 15,000 s.f. 1 7,730 s.f. Dimension: Frontage: GRFA: Access: Lot Lot24 Lot 25 Lot 26 Lot27 Lot 28 Lot 31 Lot 32 Lot Size 21,213 s.l. 17,598 s.f. 19,210 s.f. 21,649 s.f. 22,477 s.f. 20,473 s.I. 31,581 s.f. GRFA 7,307 s.f. 6,837 s.f. 7,O47 s.t. 7,364 s.f 7,472 s.f. 7,211s.f. 8,544 s,f. 80X80'min. 90'X90' 30ft. min. 118.24ft. Proposed 17,730 s.f. (no change) 90'x90' 69.73 ft. (-48.51 ft.) 6,853 s.f. (no change)6,853 s.f. The access is taken off of Vail Potato Patch. Comoarison of Prooosed Lots 29 and 30 to a selection of other lots in the immediate vicinitv within the Vail Potato Patch Subdivision Zonino Primary/Secondary Primary/Secondary Primary/Secondary Primary/Secondary Primary/Secondary Primary/Secondary Primary/Secondary VIII. APPLICATIONCRITERIAANDFINDINGS The purpose section of Title 13, Subdivision Regulations, is intended to ensure that the proposed subdivision is promoting the health, safety and welfare of the community. The criteria for reviewing an exemption plat shall be as contained in section 13-3-4 of this title which are as follows: (1) The extent to which the proposed subdivision ls consisfent with all the applicable elements of the adopted goals, objectives and policies outlined in the Vail Comprehensive Plan and is compatible with the development objectives of the town; and Staff Response: Staff has reviewed the proposed final plat and found it to be in compliance with all applicable elements of Vail Comprehensive Plan. The exchange of equal sized parcels of land, which maintains the size of each lot does not have any impact to the goals, objectives, or policies of the Vail Comprehensive Plan. (2) The extent to which the proposed subdivision complies with all of the standards of this Title, as well as, but not limited to, Title 12, Zoning Regulations and other pertinent regulations that the Planning and Environmental Commission deems appl icable ; and Staff Response: Staff has reviewed the proposed final plat and found that all submittal documents were received and the resulting lots will comply with all applicable portions of the Town of Vail Zoning Code. (3) The extent to which the proposed subdivision presenls a harmonious, convenient, workable relationship among /and uses cong.sfenf with municipal development objectives; and Staff Response: The proposed final plat modifying the shared property line between Lots 29 and 30 will not negatively affect the workable relationship among land uses as the proposal will maintain the cunent. land uses, low density residential. (4) The extent of the effects on the future development of the surounding area; and Staff Response: The proposed final plat modifying the shared property line between Lots 29 and 30 will not negatively affect the future development of the surrounding area as the development potential remains consistent such as lot size and gross residential floor area. (5) The ertent to which the proposed subdivision is located and designed to avoid creating spatial patterns that cause inefficiencies in the delivery of public seruices, or require duplication or premature extension of public facilities, or resuft in a'leapfrog'pattern of development; and Staff Response: The proposed final plat modifying the shared property line between Lots 29 and 30 will not negatively affect the elements identified in the above criterion. (6) The extent to which the utility lines are sized to serue the planned ultimate population of the seruice area to avoid future land disruption to upgrade under-sized lines; and Staff Response: The proposed final plat modifying the shared property line between Lots 29 and 30 will not affect the cunently level of utility service required in the vicinity. (7) The extent to which the proposed subdivision provides for the growth of an orderly viable community and serves the best rnferesfs of the community as awhole; and Staff Response: Staff believes the proposed final plat to modify the shared property line between Lots 29 and 30 will continue to allow for the orderly growth of the community and seryes the interests of the community as the owner of the lots will be able to modify the existing driveway to allow for an expanded garage and residential additional without the need for variances to encroach into a side setback. tx. (8) The extent to which the proposed subdivision resu/fs in adverse or beneficial impacts on the natural environment, including, but not limited to, water quality, air qualtty, noise, vegetation, riparian conidors, hillsides and other desirable natural features; and Staff Response: Staff does not believe that the proposed final plat to modify the shared property line between Lots 29 and 30 will result in any adverse impacts to any of the items listed in the above criterion. (9) Such other factors and criteria as the Commission and/or Council deem applicable to the proposed subdivision. B, Necessary Findings: Before recommending and/or granting an approval of an application for a major subdivision, the Planning and Environmental Commission shall make the following findings with respect to the proposed major subdivision: (1) That the subdivision is in compliance with the criteria listed in Subsecflon 13-3-44, Vail Town Code; and (2) That the subdivision is conslsfenf with the adopted goals, objectives and policies outlined in the Vail Comprehensive PIan and compatible with the development objectives of the Town; and (3) That the subdivision is compatibte with and suitabte to adjacent uses and appropriate for the sunounding areas; and (4) That the subdivision promotes the health, safety, morals, and general welfare of the Town and promotes the coordinated and harmonious development of the Town in a manner that conserues and enhances its natural environment and its established character as a resort and residential community of the highest quality. STAFF RECOMMENDATION The Community Development Department recommends that the Planning and Environmental Commission apploves, with a condition, an amended final plat pursuant to Chapter 1&12, Exemption Plat Review Procedures, Vail Town Code, to allow for a modification to shared property boundaries, Lots 29 and 30, Block 1, Vail Potato Patch, located at 805 and 807 Potato Patch Drive, subject to the following condition: Should the Planning and Environmental Commission choose to approve the amended final plat, the Gommunity Development Department recommends the Commission pass the following motion: "The Planning and Environmental Commission approves, with a condition, the applicant's reguesf for a final plat, pursuant to Chapter 13-12, Exemption Plat Review Procedures, Vail Town Code, to allow for a modification to shared property boundaries, Lots 29 and 30, Block 1, Vail Potato Patch, located at 805 and 807 Potato Patch Drive, and setting forth details in regard thereto." Should the Planning and Environmental Commission choose to approve the amended final plat, the Community Development Department recommends the Commission pass the following condition: 1) The applicant and his successors and assigns, shall not be permitted to request any variances subsequent to the approval of this amended final platfor Lots 29 and 30, Block 1, Vail Potato Patch, on the basis thatthe resulting approved plat created a physical hardship for developing these lots. Should the Planning and Environmental Commission choose to approve the amended final plat, the Community Development Department recommends the Commission makes the following findings: "The Planning and Environmental Commission finds: (1) That the subdivision is in compliance with the criteria listed in SuFsecfibn 13-3-44, Vail Town Code; and (2) That the subdivision ls cons.sfent with the adopted goals, objectives and policies outlined in the Vail Comprehensive Plan and compatible with the development objectives of the Town; and (3) That the subdivision is compatible with and suitable to adjacent uses and appropriate fq the sunounding areas; and (4) That the subdivision promotes the health, safety, morals, and general welfare of the Town and promotes the coordinated and harmonious development of the Town in a manner that conserves and enhances its natural environment and its established character as a resort and residential community of the highest quality. ATTACHMENTS A. Vicinity Map B. Copyof the proposed final plat C. Public Notice Attachment A +e { o tro E ()o I I ri i:i. 3' E€rl5 3 rl illlr il5t lr E IEt165li !ri idl !dlt1lill5lllat Ittl stl:ll Fl< 3qFdr II I lHft$ffi1 I i 1 ! iI I I It EtiEiEI art: 5r !i F I "l8l s t!:lc I zllegi! rrld Isl: I 5 lr IitI Iatl II'! |tiii :gi:: I igi!JEi:it ,Eri l: € ltrldllrltl :ti.!tlrll$;l I-l1 i-l | |I I lF I IIlEjl l"llltl *tIt:il i;I t:il ;! J r Alll !F EE:IIFiI <Y F.o B{ II ii i:: I I luli hl Itl i,tl lt{ 9.{ E FIF:lt:lI Pt!;;l3si Itlsii i ;: lII l:; E il U' E.i5 ii tit E.F b tq! 'i Eg; iE3 v it ig rl ^I EFE Ef93rdF a $$iilil t- r lE eli l11rl; !t;' lt!li ttl $;t Ir :rl I Tt !dt II llil L I l;tl i;I t:il ;r EEllliii I .hRS-- dl ti!!:* t (-) < -F ' !8.- . lEssBq!;: i!!!3* -E\ I ia8 ;BBee EEiEi, EEIEI : EEEiE-i HEE!FHE 7 o iirii,ifiiiiii;ii iffii$ruffi$Lli E 'Ea:.i f,s /-. ?- o.* ,ltlll !lrl $6a 5t €81 El ii ti !i: f:!i !l -t -t i? e 4. l3 I r Ii i iti' ir i #iii,in; si =i 5i<tiui ;;ET:II: Itil iii:l iiii; Eiit;:rlll t siilEX E il.,:lE3 EIiir:oFloc) h frl F.. E-la Fl LE] h E-tz () j zF F Mt) FJ Z n) V)F Fl h z V) F-{ (n ){O E-{ H.{ F F l+l Fl F{ F: z FT frl zfrl = e ZtsI :l E Ee x *-ue 6- : 's9: Ed 6FCe-:dF Ag THIS ITEM MAY AFFECT YOUR PROPERTY PUBLIC NOTICE NOTICE lS HEREBY GIVEN that the Planning and Environmental Commission of the Town of Vail will hold a public hearing in accordance with section 12-3-6, Vail Town Code on February 26, 2007, at 1:00 pm in the Town of Vail Municipal Building, in consideration of: A request for a recommendation to the Vail Town Council on a proposed major amendment to Special Development District No. 39, Crossroads, pursuant to Article 12- 9(A), Special Development District, Vail Town Code, to allow for an increase in the number of dwelling units from 69 units to 75 units; located at 141 and 143 Meadow Drive/Lot P, Block 5D, Vail Village Filing 1, and setting forth details in regard thereto. (PECo7-0004) Applicant: Crossroads East One, LLC and Crossroads West One, LLC, represented by Mauriello Planning Group, LLCPlanner: Warren Campbell A request for conditional use permits, pursuant to Section 12-7E-4, Conditional Uses, Vail Town Code, to allow for multiple-family dwellings and lodges and private club (parking club); located at 141 and 143 Meadow Drive/Lot P, Block 5D, Vail Village Filing 1, and setting forth details in regard thereto. (PEC07-0005) Applicant: Crossroads East One, LLC and Crossroads West One, LLC, represented by Mauriello Planning Group, LLC Planner: Wanen Campbell A request for a final review of a major amendment to the Approved Development Plan pursuant to Section 12-8E-18 (B) Major Amendments, to allow for a revised grading plan at Vail's Front Door Vista Bahn Ski Yard, located at 151 Vail Lane/Lot A, Block 5C, Vail Village Filing 1, and setting forth details in regard thereto. (PEC07-0006) Applicant: Vail Resorts Development Corp.Planner: George Ruther A request for a final review of an amended final plat, pursuant to Chapter 12-12, tuVP Exemption Plat Review Procedures, Vail Town Code, to allow for a modification to fli1.4 shared propertyboundaries, Lots2gand 30, Block 1, VailPotato Patch, located at805l6[- and 807 Potato Patch Drive, and setting forth details in regard thereto. (PEC07-0008) 'rrApplicant: Pedro Cerisola/Larch S.A., represented by Snowdon and Hopkins Architects, P.C.Planner: Wanen Campbell A request for a final review of a variance from Section '14-6-7, Retaining Walls, Vail Town Code, pursuant to Chapter 12-17,Yariances, to allow for a retaining wall in excess of three feet within the front setback, located at 805 Potato Patch Drive/Lot 29, Block 1, Vail Potato Patch, and setting forth details in regard thereto. (PEC07-0007) Page 1 ir; t'.. {r - ' i }..''' I';r{'it:- Applicant: Pedro Cerisola/Larch S.A., represented by Snowdon and Hopkins' Architects, P.C. Planner: Warren Campbell The applications and information about the proposals are available for public inspection during office hours at the Town of Vail Community Development Department, 75 South Frontage Road. The public is invited to aftend project orientation and the site visits that precede the public hearing in the Town of Vail Community Development Department. Please call 970-479-2138 for additional information. Sign language interpretation is available upon request, with 24-hour notification. Please call 970-479-2356, Telephone for the Hearing lmpaired, for information. Published February 9,2007, in the Vail Daily. t"'' Page 2 Applicant: Pedro Cerisola/Larch S.A., represented by Snowdon and Hopkins' Architects, P.C. Planner: Wanen Campbell The applications and information about the proposals are available for public inspection during office hours at the Town of Vail Community Development Department, 75 South Frontage Road. The public is invited to attend project orientation and the site visits that precede the public hearing in the Town of Vail Community Development Department. Please call 97 0 -47 9-2 1 38 for ad d itiona I i nformation. Sign language interpretation is available upon request, with 24-hour notification. Please call 970-479-2356, Telephone for the Hearing lmpaired, for information. Published February 9,2007, in the Vail Daily. Attachment C Page 2 '1- l t'li,i Subdivision Review Appl for Review bY the nnmg a Environ mental Commission of CommunitY Development Road, Vail, Colorado 81657 Cn,ZtZe faxl. 97O.479.2452 www.vailgov.com r"5 -Depal 75 South tel: I General Information: AllprojectsrequiringPlanningandEnvlronmentalcommissionrevie\wmustreceiveapprovalpriorbsubmittinga buitdins permit appticauon. d1ffi il:;iJ'ffiil;tt i;A;l'*ens tor.the Pardrular-apProval that is requested' An application for ptanning ..0 Eir*nrinmt commissioniEte",, annot be accepted until all required informauon is received by the commun',y-il;til;;f oep"rtment. ih"'*r"t mav also need to be revlewed bv the Town Council and/or the Design Review Board' Type of ApPlication and Fee: frifil w 3 o ooD D tr )(n- E] tr tr tr Rezoning $1300 Major Srlbdivislon $1500 Minor Subdivision $650 ExempUon Plat $650 MinoiAmendmenttoanSDD $1000 New Speciat Development District $6000 Maior Amendment to an SDD $6000 Major Amendment to an SDD $1250 ho exbrior ndifr@fidns) tr Conditional Use Permit $650 A ift"opf.i. uodifiotion $400 a iai..r:ex.tior Alteration $619 E i'i;j;; d;oi meration $8oo E oeietopment Ptan $1500 E nrl-t'a'^.tnt to a Development Plan $250 fr 2".i.s Cod. Amendment $1190 E variance $500- sign variance $2oo 41Descriptlon of tlre Request: LocaHon of the ProPosal: Lot: Physical Address: Parcel I Zoning: Name(s) of Owner(s): Mailing Address: Owner(s) Name of APPlicant: Mailing Address: Phone: (Contact Eagle Co. Assessor at 970-328-8640 for parcel no') E-mail Address: ****a****+*t+**+*******************+**************************+*f**f******+t*************+++ TOWNOFVAIL. COLORADO Statement Statement Nudber: R0?0000095 Anount: $550.00 Ot/29/2O07o2:56 PM Palment Method: Check IIOPKINS ARCHITECTS Init : 'JSNotation: 780/SNOWDON Permit No: PEC070008 Tl4)e: PEC - Minor Subdivieion Parcel No: 2101- 063 - 0101- 9 Site AddreEg: 805 POTATO PATCH DR VAIIJ Location: 805 PO:IATO PATCH DR. Total Fees: $550.00This Pal,'ment: $650.00 Total AI.',IJ Pmtss: $550.00 ? Balance: $0.00*****+{!+******+***************+*+******t+a*****lll******i'}***********{'ta'+*+++++*********++{'la' ACCOI,]NT ITEM LIST: Account Code DeecriDtion current Pmta PV OO1OOOO31125OO PEC APPI,TCATION FEES 550.00 January 29,2007 Town of Vail PEC Application for a Minor Subdivision Review Lots 29 and 30. Block 1, Vail Potato Patch Sirs, The owner of lots 29 and 30' Pedro Cerisola, is requesting a minor subdivision approval so that he may enlarge Lot 29 by 1 1 67 square feet for his existing 3 story residence in which he has lived for l7 years. He is planning to add an elevator in the existing garage, enlarge the existing garage to park 3 cars and add a one bedroom apartment below. The additional land will be used to extend the existing retaining wall and driveway and the garage and apartment expansion. We are planning a new residence for Lot 30. The new property line does not affect the development of Lot 30. Please contact me ifyouhave any questions, Sincerelv. Q,,Cutu lpt^< Pamela W. Hopkins. AIA Principal PO Box 3340 . Vail, Colorado 81658 . 970-476-2201 . 970-476-7491(F) o Snowdonllopkins.com January 29,2007 Town of Vail PEC RE: lot 29 and30, Block l, Vail Potato Patch Adj oining property owners : TRACT A: Town of Vail, 75 South Frontage Road, Vail, CO 81657 Lot 5 and 6: Diane J. Boyer, PO Box 456,Yai, CO 81658 PO Box 3340. Vail, Colorado 81658 .970-476-2201 .970-476-7491(F). Snowdonflopkins.com American tand Title Association Commitment - 1982 TITLE INSURANCE COMMITMENT BY ,stewartI ) title guaranty company Order Number: 6038331 We agree to issue policy to you according to the terms of the Commitment. When lve sholv the policy amount and your name as the proposed insured in Schedule A, this Commitment becomes effective as of the Commitment Date shorvn in Schedule A. lf lhe Requirements shown in this Commitment have not been met rvithin six months after the Commitment Date, our obligation under this Commitment will end. Also, our obligation under this Commitment rvill end when the Policy is issued and then our obligation to you rvill be under the Policy. Our obligation under this Commitment is limited by the follolving: The Provisions in Schedule A. The Requirements in Schedule B-I. The Exceptions in Schedule B-ll. The Conditions on Pase 2. This Commitment is not valid without SCHEDULE A and Sections I and II of SCHEDULE B. THIS COMMITMf,NT IS NOT AN ABSTRACT, EXAMINATION, REPORT OR REPRN,SENTATION OF FACT OR TITLE AND DOES NOT CREATE AND SHALL NOT BE THE BASIS OF ANY CLAIM FOR NEGLIGENCE, NEGLIGENT MISREPRESENTATION OR OTHER TORT CLAIM OR ACTION. THE SOLE LIABILITY OF COMPANY AND ITS TITLE INSURANCE AGENT SHALL ARISE UNDER AND BE GOVERNED BY PARAGRAPH 4 OF THE CONDITIONS, lN WITNESS WHEREOF, Stewart Titte Guaranty Company has caused its corporate name and seal to be hereunto affixed bv its dulv authorized officers on the date shown in Schedule A. stewart Countersigned: Stervart'f itle of Colorado - Vail Division 97 lvlain St., Suite W-201 Edwards, CO 81632 OrderNumber: 6038331 I of 2 Commitment - 235 WO Disclosurc tf'i,1T."\tti. rsos.€Ilt*rf COMMITMENT FOR TITLE INSURANCE SCHEDULE A 1. Effective Date: November 2'7.2006 at 8;00 a.m. 2. Policv or Policies To Be Issued: Order No.: 6038331 Amount of Insurance (a) A.L.T.A. Owner's Proposed Insured: TO BE DETERMINED (b) A.L.T.A. Loan (Standard) 3. The estate or interest in the land described or referred to in this Commitment and covered herein is: Fee Simple 4. Title to the Fee Simple estate or interest in said land is at the effective date hereof vested in: l-ot29: LARCH. S.A.. A PANAMANIAN CORPORATION t-ot 30: CALUMET HOLDINGS. S.A.. A PANAMANIAN CORPORATION 5. The land referred to in this Commitment is described as follows: LOTS 29 and 30, BLOCK I, VAIL/POTATO PATCH, According to the plat recorded March 5, 1974 in Book 233 at Page 629 as Reception No. 129527. COUNTY OF EAGLE STATE OFCOLORADO. Purported Address: STATEMENTOFCHARGES 807 Potato PatCh Drive These charges are due and payable vail, cotorado g 1657 before a Policy can be issued: PREMIUM: Mortgage: $100.00 STEWART TITLE G UARANTY COMPANY Commitment - Schedule A Paee I of I COMMITMENT FOR TITLE INSURANCE SCHEDULEB-Section I REQUIREMENTS Order Number: 6038331 The following are the requirements to be complied with: l. Payment to or for the account of the grantor(s) or mortgagor(s) of the full consideration for the estate or interest to be insured. 2. Proper instrument(s) creating the estate or interest to be insured must be executed and duly filed for record, to wit: 3. This report is for informational purposes only. No policy will be issued. STEWART TITLE GUARANry COMPANY Commitment - Schedule B I Page I of I Order Number: 6038331 COMMITMENT FOR TITLE INSURANCE SCHEDULEB-Section2 EXCEPTIONS Order Number: 6038331 The policy or policies to be issued will contain exceptions to the following unless the same are disposed of to the satisfaction of the Company: ' L Rights or claims of parties in possession, not shown by the public records. 2. Easements, or claims of easements, not shown by the public records. 3. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, or any facts, which a correct survey and inspection of the premises would disclose, and which are not shown by the public records. 4. Any lien, or right to a lien, for services, labor or material heretofore or hereafter furnished, imposed by laws and not shown by the public records. 5. Defects. liens, encumbrances, adverse claims or other matters, if any, created first appearing in the public records or attaching subsequent to the effective date hereof, but prior to the date the proposed insured acquires of record for value the estate or interest or mortgage thereon covered by this commitment. 6. Unpatented mining claims, reservations or exceptions in patents, or an act authorizing the issuance thereof; water rights, claims or title to water. 7. Any and all unpaid taxes and assessments and any unredeemed tax sales. 8. The effect of inclusions in any general or specific water conservancy, fire protection, soil conservation or other district or inclusion in any water service or street improvement area. 9. Reservations or exceptions in Patents, or in Acts authorizing the issuance thereof, including the reservation of a right of way for ditches or canals constructed by the authority of the United States, as reserved in United States Patent recorded August 15, 1935 in Book 93 atPage278. 10. Restrictive Covenants recorded March 5, 1974 in Book 233 at Page 628 as Reception No. 129526 and as amended in instrument recorded September 24, 1915 in Book 241 atPage 950 as Reception No. 138069. 11. All matters shown on the platof Vail/Potato Patch, recorded in Book 233 atPage 629 as Reception No. 129527. 12. Easement Deed dated August 6, I 98 I recorded at Book 327 , Page 614 as Reception No. 2239'7 6. (Ihe above items affect both L,ots 29 and 30) STEWART TITLE G UARANTY COMPANY Conrmitn]ent- Schedule B 2 Paee I of 2 Order Number: 60-1833 | 13. A Deed of Trust dated February I8, 1992, executed by S.A. larch, a Panamanian Corporation, to the Public Trustee of Eagle County, to secure an indebtedness of $4O0,000.00 in favor of California Commerce Bank recorded December 28, 1993 in Book 628 atPage 668 as Reception No. 52/1729. 14. A Deed of Trust dated Novemberg, l999,executed by larch, S.A., a Panamanian Corporation, to the Public Trustee of Eagle County, to secure an indebtedness of $1,000,000.00 in favor of California Commerce Bank recorded December 28, 1999 as Reception No. 718fti2. (The above items affect Lot29) STEWART TITLE GUARANTY COMPANY Commitment - Schedule B 2 Page2 of 2 Order Nrmber: 603S3 | DISCLOSURES Pursuant to C.R.S. 10-11-122, notice is hereby given that: A. THE SUBJECT REAL PROPERTY MAY BE LOCATED IN A SPECIALTAXING DISTR]CT; A CERTIF]CATE OFTAXES DUE LISTING EACH TAXING JURISDICTION SHALL BE OBTAINED FROM THE COUNTY TREASURER OR THE COUNTY TREASURER'S AUTHORIZED AGENT; INFORMATION REGARDING SPECIAL DISTRICTS AND THE BOUNDARIES OF SUCH DISTRICTS MAY BE OBTAINED FROM THE BOARD OF COUNTY COMMISSIONERS, THE COUNTY CLERK AND RECORDER, ORTHE COUNTY ASSESSOR NOTE: Colorado Division of Insurance Regulations 3-5-1, Paragraph C of Article VII requires that "Every title entity shall be responsible for all matters which appear of record prior to the time of recording rvhenever the title entity conducts the closing and is responsible for recording or filing of legal documents resulting from the transaction which was closed." Provided that Stervart Title of Colorado - Vail Division conducts the closing of the insured transaction and is responsible for recording the legal documents from the transaction, exception number 5 will not appear on the Orvner's Title Policy and the Lender's Title Policy when issued' NOTE: Affirmative Mechanic's Lien Protection for the Owner may be available (typically by deletion of Exception No. 4 of Schedule B, Section 2 of the Commitment from the Owner's Policy to be issued) upon compliance with the following conditions: A. The land described in Schedute A of this commitment must be a single-family residence, which includes a condominium or townhouse unit. B. No labor or materials have been furnished by mechanics or materialmen for purposes of construction on the land described in Schedule A of this Commitment within the past 6 months. C. The Company must receive an appropriate affidavit indemnifying the Company against unfiled Mechanic's and Materialmen's Liens. D. The Company must receive payment of the appropriate premium. E. If there has been construction, improvements or major repairs undertaken on the property to be purchased, within six months prior to the Date of the Commitment, the requirements to obtain coverage for unrecorded liens will include: disclosure of certain construction information; financial information as to the seller, the builder and/or the contractor; payment of the appropriate premium; fully executed Indemnity agreements satisfactory to the company; and, any additional requirements as may be necessary after an examination of the aforesaid information by the Company. No coverage will be given under any circumstances for labor or material for which the insured has contracted for or agreed to pay. NOTHING HEREIN CONTAINED WILL BE DEEMED TO OBLIGATE THE COMPANY TO PROVIDE ANY OF THE COVERAGES REFERRED TO HEREIN, UNLESS THE ABOVE CONDITIONS ARE FULLY SATISFIED. Stewart Title of (lolorado - Vail Division Filc Number: 6038331 Disclosurcs B. C. MINERAL DISCLOSURE Order No: 6038331 To comply with the provisions of C.R.S. 10-11-123, the Company makes the following disclosure: (a) That there is recorded evidence that a mineral estate has been severed, leased or otherwise conveyed from the surface estate and thatthere is a substantial likelihood that a third party holds some or all interest in oil, gas, other minerals, or geothermal energy in the property; and (b) That such mineral estate may include the right to enter and use the property without the surface owner's permission. NOTE: THIS DISCLOSURE APPLIES ONLY IF SCHEDULE B, SECTION 2 OF THE TITLE COMMITMENT HEREIN INCLUDES AN EXCEPTION FOR SEVERED MINERALS. Stcwart'fi c of Colorado - Vail Division File Number: 6038331 Mineral Disclosur€ Rev. 07/2001 Privacy Policy Notice PURPOSE OF THIS NOTICE Title V of the Gramm-trach-Bliley Act (GLBA) generally prohibits any financial institution, directly or through its affiliates, from sharing nonpublic personal information about you with a nonaffiliated third party unless the institution provides you with a notice of its privacy policies and practices, such as the type of information that it collects about you and the categories of persons or entities to whom it may be disclosed. In compliance with the GLBA, we are providing you with this document, rvhich notifies you of the privacy policies and practices of Stewart Title Guaranty Company and Stewart Title <lf Coklrado - Vail Division. We may collect nonpublic personal information about you from the following sources: Information we receive from you, such as on applications or other forms. Information about your transactions we secure from our files, or from our affiliates or others. lnformation we receive from a consumer reporting agency. Information that we receive from others involved in your transaction, such as the real estate agent or lender. Unless it is specifically stated otherwise in an amended Privacy Policy Notice, no additional nonpublic personal lnformation will be collected about you. We may disclose any of the above information that we collect about our customers or former customers to our affiliates or to nonaffiliated third parties as permitted by law. We also may disclose this information about our customers or former customers non affiliated companies that perform services on our behalf. WE DO NOT DISCLOSE ANY NONPUBLIC PERSONAL INFORMATION ABOUT YOU WITH ANYONE FOR ANY PURPOSETHAT IS NOT SPECIFICALLY PERMITTED BY LAW. We restrict access to nonpublic personal information about you to those employees rvho need to know that information in order to provide products or services to you. We maintain physical, electronic, and procedural safeguards that comply rvith federal regulations to guard your nonpublic personal information. Some states give you the right to access and correct nonpublic personal information. You may contact us in writing at out Home Office, if your state larv gives you this right. Revised 6/05 ., 3. 4. CONDITIONS 1. DEFINITIONS (a) "Mortgage" means mortgage, deed of trust or other security instrument. (b) "Public Records" means title records that give constructive notice of matters affecting your title - according to the state statutes where vour land is located. LATER DEFECTS The Exceptions in Schedule B - Section Il may be amended to show any defects, liens or encumbrances that appear for the first time in the public records or are created or attached between the Commitment Date and the date on which all of the Requirements (a) and (c) of Schedule B - Section I are met. We shall have no liabilitv to you because of this amendment. EXISTING DEFECTS If any defects, liens or encumbrances existing at Commitment Date are not shown in Schedule B, we may amend Schedule B to shown them. If we do amend Schedule B to show these defects, liens or encumbrances, we shall be liable to you according to Paragraph 4 belorv unless you knew of this information and did not tell us about it in writins. LIMITATION OF LIABILITY Our only obligation is to issue to you the policy referred to in this Commitment when you have met its Requirements. If we have any liability to you for any loss you incur because of an error in this Commitment, our liability will be limited to your actual loss caused by your relying on this Commitment when you acted in good faith to: Comply with the Requirements shown in Schedule B - Section I. or Eliminate with our rvritten consent any Exceptions shown in Schedule B - Section IL We shall not be liable for more than the Policy Amount shorvn in Schedule A of this Commitment and our liability is subject to the terms of the Policy form to be issued to you. 5. CLAIMS MUST BE BASED ON THIS COMMITMENT Any claim, whether or not based on negligence, which you may have against us concerning the title to the land must be based on this Commitment and is subject to its terms. Order Number: 6038331 2 of 2 Commitment - 235 WO Disclosure Status: J Approved Courtruuw DEvELopMENT Rounne Fonnn I Approved with conditions fi Denied Routed To:George Chalberg, PW Date Routed:01t30t07 Routed By:Warren Campbell Date Due:02t07t07 Description of work:Proposed replat of shared property line between two exisitng lots Address:805 and 807 Potato Patch Drive Legal:Lot:29 and 30 Block:1 Subdivision:Vail Potato Patch Comments:Date Reviewed:211107 Need additional review bv Fire Department. Get information on manhole. Find out if it is orivate or Eaole Rivers oer Chad Salli. TOIIryOF IIA[, D epafiment of Community Development 75 South Frontage Road Yail. Colorado 81657 970-479-2138 FAX 970-479-2452 wwwvailgov.com February 2,2007 Snowdon and Hopkins Architects c/o Pam Hopkins P.O. Box 3340 Vail, CO 81658 Re: Replat of a shared property line between Lots 29 and 30, Block 1, Vail Potato Patch Ms. Hopkins, This letter is being sent in response to your Exemption Plat application to adjust the shared property line between Lots 29 and 30, located at 805 and 807 Potato Patch Drive. Staff has performed a review and the following are my comments that need to be addressed prior to moving fonvard with scheduling on a Planning Commission agenda: r Please amend the title of the plat to read as follows; Amended FinalPlat Lots 29 and 30, Block 1, Vail Potato Patch A Resubdivision of Lots 29 and 30, Block One, Vail Potato Patch Tor,vn of Vail, County of Eagle, State of Colorado r Please add a note under the Notes portion of the plat which states clearly the purpose of the ptat. . The Eagle River Water and Sanitation District identified a concem regarding a sewer manhole located just west of the existing driveway on Lot 29. They asked me to have you please call a Jean Certa at 476-7480 to perform a utility locate on the sewer and identify whether or not it is a public or private service line. In addition, he will identify whether or not the District needs an easement over the line. lf an easement is required please show the easement on the proposed ptat. Please review these comments and contact me at 970-479-2148 if you have any questions. Please respond at your earliest convenience to avoid any unnecessary delay. In order to remain on the February 26h Planning and Environmental Commission agenda please have all the items identified above sitisfactorily addressed and revisions submitted no laler than February 16h at 5:00 p.m. Regards, A | .l/\ lt ilil/,'w$.I\twLry Warren Campbell Senior Planner Cc: File fp NBCYCLED PlPER P**P'tt^,1*4 ccl,ilrllY (EtElJoFtE r Planning and Environmental Commisson ACTTOI{ FORtrl Department of Community Deyelopment 75 South Frontage Road, Vail, Colorado 81657 tel: 970.479.2139 fax: 978.479,2452 web: www.vailgov,com Proie€t Name: Oerisola Retaining Wall Var. Project Description: PEG Number: PEC070007 Request to extend an existing retaining wall which exceeds 3 feet in height within the front setback. The proposed retaining wall is approximately 11 feet tall. Participants: OWNER LARCH, S.A, c/o cERrsoLA 805 POTATO PATCH DR VAIL co 81657 0t12912007 APPUCANT SNOWDON AND HOPKINS, ARCHfiE0U29/2007 Phone : 970476-220L PO BOX 3340 VAIL co 816s8 License: C000001763 ARCHITECT SNOWDON AND HOPKINS, ARCHm0l/29l2007 Phonet 970-476-22Q1 PO BOX 3340 VAIL co 81658 License: C000001763 Prcject Address: 805 POTATO PATCH DR VAIL locauon: 805 POTATO PATCH DR. Legal Description! Lotr 29 Bloclc 1 Subdivision: VAIL POTATO PATCH Parcel llumber: 2101-063-0101-9 Comments: SeeConditions BOARD/STAFF ACTION Motion By: Kjesbo Second By: Jewitt Vote: 6-0-0 Conditions: Action: APPROVED Date of Apprcva[ Q312612007 Cond:8 (PLAN): No changes to these plans may be made without the written consent of Town of Vail staff and/or the appropriate revieh, committee(s), Cond: 300 PEC approval shall not be not become valid for 20 days following the date of approval. Cond: 113 All development applications submitted to the Town after the effective date of Ordinarre 25, Series 2006 shall be subject to the pending emplope housing regulations In whaEner brm they are finally adopH; provitled, howwer, that if tfie Tqm fdils to adopt the pendlrp arpbyee houslng regulatjons by Aptil t5,20/J7, this Odinane shall not apply to such danelopment applications. Wanen Campbell PEG Fee Paid: $500.00 FROM: DATE: SUBJECT: MEMORANDUM Planning and Environmental Commission Community Development Department March26,2007 A request for a final review of a variance from Section 14-6-7, Retaining Waffs, Vaif Town Code, pursuant to Chapter 12-17, Variances, to allow for a retaining wall in excess of three feet within the front setback, located at 805 Potato Patch Drive/Lot 29, Block 1, Vail Potato Patch, and setting forth details in regard thereto. (PEC07-0007) Applicant Pedro Cerisola/Larch S.A., represented by Snowdon and Hopkins Architects, P.C. Planner: Wanen Campbell [. SUMMARY The applicant, Pedro Cerisola, represented by Snowdon and Hopkins Architects, are requesting approval of a variance from Section 144-7, Retaining Walls, Vail Town Code, pursuant to Chapter 12-17,Yariances, to allow for a retaining wall in excess of three feet within the front setback, located at 805 Potato Patch Drive/Lot 29, Block 1, Vail Potato Patch. The purpose of the requested variance is to allow for the extension of an existing retaining wall measuring 11 feet in height at its tallest point, to facilitate a garage and residential addition to the west side of the existing residence on Lot 29. Staff is recommending approval of this application subject to the findings and criteria outlined in Section Vlll of this memorandum. DESCRIPTION OF REQUEST The applicants, Pedro Cerisola, represented by Snowdon and Hopkins Architects, are requesting a variance from Section 144-7, Retaining Walls, Vail Town Code, pursuant to Chapter 12-17,Yanances, to allow for a retaining wall in excess of three feet within the front setback. The purpose of the requested variance is to allow for the extension of an existing retaining wall to facilitate a garage and residential addition to the west side of the existing residence on Lot 29. The existing retaining wall is 11 feet in height at its tallest some point and was approved by the granting of a variance by the Planning and Environmental Commission on July 23, 1990. This proposal would remove approximately 40 feet of existing wall and add approximately 70 feet of retaining wall, which at its tallest point would be 11 feet in height. lf this application is approved, the applicant will be submifting a design review application for an addition to the existing residence on Lot 29. A vicinity map is attached depicting the subject property (Attachment A), as is a reduced copy of the proposed site plan (Attachment B). ilt.BACKGROUND Lots 29 and 30, Block 1, Vail Potato Patch, were annexed into the Town by Ordinance 8, Series of 1969, which became effective on August 23, 1969. The existing structure on Lot 29 was approved by the Design Review Board on June 6, 1990. On July 23, 1990, the Planning and Environmental Commission approved a variance to allow for the retaining wall on site to range in height from 3 to 11 feet at a length of 134 feet. The retaining wall was located entirely upon the applicant's property. There have been no applications to perform any work on this lot since construction of the home. ROLES OF REVIEWNG BOARDS Order of REview: Generally, wriance applications will be reviewed by the Planning and Environmental Commission, and then any accompanying design review application will be reviewed by the Design Review Board. Planning and Environmental Commission: The Planning and Environmental Commission is responsible for final approval, approval with modifications, or denial of a variance application, in accordance with Chapter 12-17,Yariances, Vail Town Code. Design Review Board: The Design Review Board has no review authority over a variance application. However, the Design Review Board is responsible for the final approval, approval with modifications, or denial of any accompanying design review application. Torrrn Council: The Town Council has the authority to hear and decide appeals from any decision, determination, or interpretation by the Planning and Environmental Commission and/or Design Review Board. The Town Council may also call up a decision of the Planning and Environmental Commission and/or Design Review Board. Staff: The Town Staff facilitates the application review process. Staff reviews the submitted application materials for completeness and general compliance with the appropriate requirements of the Town Code. Staff also provides the Planning and Environmental Commission a memorandum containing a description and background of the application; an evaluation of the application in regard to the criteria and findings outlined by the Town Code; and a recommendation of approval, approval with modifications, or denial. APPLICABLE PLANNING DOCUMENTS TITLE 12: ZONING REGULATIONS Chapter'12-17 : Yariances (in part) tv. v. 12-17-1: Purpose: A. Reasons for Seeking Variance: ln order to prevent or fo /essen such practical difficulties and unnecessary physical hardships rnconsrbfenf with the objectives of this title as would resuft from strict or literal interpretation and enforcement, variances from ceftain regulations may be granted. A practical difftculty u unnecessary physical hardship may result from the size, shape, or dimensions of a site or the location of existing sfrucfures thereon; from topographic or physical conditions on the site or in the immediate vicinity; or from other physical limitations, street locations or conditions in the immediate vicinity. Cosf or inconvenience to the applicant of strict or literal compliance with a regulation shall not be a reason for granting a variance. VI. SURROUNDING I-AND USES AND ZONING Land Use ZoninqNorth: Residential Primary/Secondary DistrictEast Open Space Outdoor Recreation DistrictWest Residential Primary/Secondary DistrictSouth: Open Space Outdoor Recreation District VII. SITE ANALYSIS Legal Description: Lot 29, Block 1, Vail Potato PatchZoning: Primary/Secondary Residential Land Use Plan Designation: Low Density Residential Current Land Use: Single-Family Drvelling Lot Size: 23,422 sq. ft. (0.537 acres) Standard Allowed/Required Existino Proposed Setbacks (min): Front 20ft. 23ft. no change.Sides 15 ft. 18f1.141ft. 18 ft./ 15 ft.Rear: 15ft. 91ft. 85ft. Height (max.): 30 ft./33 ft, 33 ft. no change Density (max): 2 dwellings 1 dwelling no change GRFA (max): 7,596 sq. ft. 5,459 sq. ft. 6,577 sq.ft. Site coverage (max.): 4,684 sq. ft. 2,476 sq. ft. 3,124 sq.ft. VIII. APPLICATIONCRITERIAANDFINDINGS The review criteria for a request of this nature are established by Chapter 12-16, Vail Town Code. A. Consideration of Factors Reoardino Variances: 1. The relationship of the requested variance to other existing or potential uses and structures in the vicinity. This proposed extension of an existing retaining wall which exceeds the maximum allowable height of three feet within the front setback is 2. associated with a proposed addition to the west side of the existing structure. As stated previously in this memorandum, the existing structure was approved on June 6, 1990 and the variance to allow for the retaining wall associated with this construction was approved on July23,1990. lf this variance were to be approved, staff does not believe that other existing or potential uses and structures in the vicinity would be negatively affected. The elevation of the Potato Patch Drive at 8,625 feet, the elevation of the structure and proposed addition 8,610 feet, and the location of the structure on the lot combine to screen the impact of the appearance of the retaining wall from neighboring lots and from other locations in the vicinity. The prospoed extension to the retaining wall will be finished with a stone veneer facing (keystone block), which will match the existing wall. The degree to which relief from the stric{ and literal interpretation and enforcement of a specified regulation is necessary to achieve compatibility and uniformity of treatment among sites in the vicinity or to attain the objectives of this title without a grant of special privilege. The topographic conditions on Lot 29 are such that the buildable area/location of the site is very well defined. Because the average slope on the site is approximately 50%, access onto the site is extremely difficult and the designed approved in 1990 was deemed to be a reasonable solution. At the time of approving the cunent variance the Planning Commission and Staff believed that the retaining wall as constructed currently was necessary to ensure stabilization of the slopes and Potato Patch Road. Prior to granting the variance for the current retaining wall options such as using three foot tiered combination retaining walls were explored. lt was determined through soil engineering reports and analysis that the types of soils present and the pressures which would be exerted on the retaining wall by Potato Patch Drive would be more than a three foot tiered retaining wall could withstand. lt was determined that the currently constructed design which has portions of the retaining wall at 11 feet was the best solution. The current proposal proposes to continue the current retaining wall design an additional 70 feet along the front of the property bringing the total length to approximately 160 feet. The cunent wall is approximately 134 feet. The conditions of the topography and soil have not changed since approval of the variance in 1990 and staff believes that the proposal allows for the minimum relief necessary from the strict and literal B. interpretation of the Gode to allow for the applicant to reasonably utilize their property. 3. The effect of the requested variance on light and air, distribution of population, transportation and traffic facilities, public facilities and utilities, and public safety. Staff does not believe this proposal will have a significant impact on the public health, safety or welfare, public facilities, utilities, or light and air in comparison to existing conditions of the site as there is currently a retaining wall on site which does not negatively impact this elements and the proposed extension would not create a situation in which there would be a negative impact.. 4. Such other factors and criteria as the commission deems applicable to the proposed variance. The Planninq and Environmental Gommission shall make the followinq findinqs before orantino a variance: 1. That the granting of the variance will not constitute a grant of special privilege inconsistent with the limitations on other properties classified in the same district. 2. That the granting of the variance will not be detrimental to the public health, safety or welfare, or materially injurious to properties or improvements in the vicinity. 3. That the variance is warranted for one or more of the following reasons: a. The strict literal interpretation or enforcement of the specified regulation would result in practical difficulty or unnecessary physical hardship inconsistent with the objectives of this title.b. There are exceptions or extraordinary circumstances or conditions applicable to the same site of the variance that do not apply generally to other properties in the same zone.c. The strict interpretation or enforcement of the specified regulation would deprive the applicant of privileges enjoyed by the owners of other properties in the same district. STAFF RECOMMENDATION The Community Development Department recommends that the Planning and Environmental Commission approves the request for a final reMew of a variance from Section 14-6-7, Retaining Walls, Vail Town Code,'pursuant to Chapter 12-17, Variances, to allow for a retaining wall in excess of three feet within the front setback, located at 805 Potato Patch Drive/Lot 29, Block 1, Vail Potato, and setting forth details in regards thereto. !x. Should the Planning and Environmental Commission choose to approve this variance request, the Community Development Department recommends the Commission pass the following motion: The Planning and Environmental Commission approves the applicant's request fu a variance from Section 14-67, Retaining Walls, Vail Town Code, pursuant to Chapter 12-17, Variances, Vail Town Code, to allow for a retaining wall in excess of three feet within the front setback, located at 805 Potato Patch Drive/Lot 29, Block 1, Vail Potato, and setting for details in regard thereto. Should the Planning and Environmental Commission choose to approve this variance request, the Community Development Department recommends the Commission makds the following findings: The Planning and Environmental Commission finds: 1. The granting of this variance will not constitute a granting of special privilege inconsistent with the limitations on other properties c/assifled in the Two-F am ily Re sid e ntial Di strict. 2. The granting of this variance will not be detrimental to the public health, safety, or welfare, or materially injurious to propefties or improvements in the vicinity. 3. This variance is wananted for the following reasons.' a. The strict literal interpretation or enforcement of the specified regulation would result in practical difficulty or unnecessary physical hardship inconsistent with the objectives of Title 12, Zoning Regulations, Vail Town Code. b. There are exceptions or extraordinary circumstances or conditions applicable to the same site of the variance that do not apply generally to other propefties in the same district. c. The stict interpretation or enforcement of the specified regulation would deprive the applicant of privileges enjoyed by the owners of other properties in the same district. ATTACHMENTS Vicinity Map Copy of the proposed site plan Public Notice A. B. c. Attachment A r6rr{lr xvi IEZ4LfrLB €99t8 Opsrotoc tFn ot€s xos o d oovuoloc'llvn HSrVd OrVtOd 'L yco]8 '62 Io'I 3CN30|S3U \nOSH33 F 'c d 'sles|lrfcJv. supdoH pue uop/$ous o o E.cor!E orlBEl*il=.l' Ellg i 3;lC-l Hffi ,,ii 'l$H,l\1,r'll l'[\l *E f u g I $ g 3r95 ;r dE G.l {E; ;.-i8- ls.rg:3 !:!i:H 5 r. 3-\Ft'rzs +? l\i EN ;srEu EEicir FiEgE,iFilii:; ::$E3$$ \ FrS t ! - 6 i?l"i,zI E Rl:{i,, iT*t !iJ t\ _) I Irriii:,-!:5 ., t i 3li$i PIEIg *IEF$ ,-) tL tr FI tE 9: tsa I E i \\|ltl I I ii I I \ ! I I i ! \ )r ,] c a{ o rl- \:( ', r\\a k \31\+ -i--t-- .\l - EF I:E I5EltB I;:l:s Ifi\i itsr I $ $lie 18t2€rt)dj 8e9lg ocaroloo'tF r@{l 'ttlc lrilgxog od 'c'd 'dpet$.rv. suppol{ pue uop tous oo\ntoloc'.llv^ HOIVd olvrod 'l xcolE '62 rol SSNilOlSSU V-lOSlU39 IV-/lt, = =luE -t F JJ =o =z 3FllrE oz-a Rlu _.r tlJtl $ll otlzl ztl f,ilru iltrll ollZTFI U'Nxllur llollztl<ll otl uJ il@il 8tl E lti JJf.oz z Futto|llooo-oEooz Fo* t.Ll THIS ITEM MAY AFFECT YOUR PROPERTY PUBLIC NOTICE NOTICE lS HEREBY GIVEN that the Planning and Environmental Commission of the Town of Vail will hold a public hearing in accordance with section 12-3-6, Vail Town Code on February 26, 2007, at 1100 pm in the Town of Vail Municipal Building, in consideration of: A request for a recommendation to the Vail Town Council on a proposed major amendment to Special Development District No. 39, Crossroads, pursuant to Article 12- 9(A), Special Development District, Vail Town Code, to allow for an increase in the number of dwelling units from 69 units to 75 units; located ai 141 and 143 Meadow Drive/Lot P, Block 5D, Vail Village Filing '1, and setting forth details in regard thereto. (PEC07-0004) Applicant: Crossroads East One, LLC and Crossroads West One, LLC, represented by Mauriello Planning Group, LLCPlanner: Warren Campbell A request for conditional use permits, pursuant to Section 12-7E4, Conditional Uses, Vail Town Code, to allow for multiple-family dwellings and lodges and private club (parking club); located at 141 and 143 Meadow Drive/Lot P, Block 5D, Vail Village Filing. 1, and setting forth details in regard thereto. (PEC07-0005) Applicant Crossroads East One, LLC and Crossroads West One, LLC, represented by Mauriello Planning Group, LLCPlanner: Wanen Campbell A request for a final review of a major amendment to the Approved Development Plan pursuant to Section 1 2-8E-18 (B) Major Amendments, to allow for a revised grading plan atVail's Front DoorVista Bahn SkiYard,located at 151 VailLane/LotA, Block 5C, Vail Village Filing 1, and setting forth details in regard thereto. (PEC07-0006) Applicant: Vail Resorts Development Corp.Planner: George Ruther A request for a final review of an amended final plat, pursuant to Chapter 12-12, Exemption Plat Review Procedures, Vail Town Code, to allow for a modification to shared property boundaries, Lots 29 and 30, Block 1, Vail Potato Patch, located at 805 and 807 Potato Patch Drive, and setting forth details in regard thereto. (PEC07-0008) Applicant Pedro Cerisola/Larch S.A., represented by Snowdon and Hopkins Architects, P.C.Planner: Warren Campbell A request for a final review of a variance from Section 14-6-7, Retaining Walls, Vail -^ii. ^L Town Code, pursuant to Chapter 12-17,Yariances, to allow for a retaining wall in excess (" 14"' -4 -F of three feet within the front setback, located at 805 Potato Patch Drive/Lot 29, Block 1, 7l ' v-I ! Vail Potato Patch, and setting forth details in regard thereto. (PEC07-0007) Page 1 Attachment C \ , -1r .'t 'C ". , t f.f i.i ' i\.; Applicant: Pedro Cerisola/Larch S.A., represented by Snowdon and Hopkins Architects, P.C. Planner: Warren Campbell The applications and information about the proposals are available for public inspection during office hours at the Town of Vail Community Development Department, 75 South Frontage Road. The public is invited to attend project orientation and the site visits that precede the public hearing in the Town of Vail Community Development Department. Please call 970-479-2138 for additional information. Sign language interpretation is available upon request, with 24-hour notification. Please call 970-479-2356, Telephone for the Hearing lmpaired, for information. Published February 9, 2007, in the Vail Daily. .,:4* Page 2 Applicant: Pedro Cerisola/Larch S.A., represented by Snowdon and Hopkins Architects, P.C.Planner: Wanen Campbell The applications and information about the proposals are available for public inspection during office hours at the Town of Vail Community Development Department, 75 South Frontage Road. The public is invited to attend project orientation and the site visits that precede the public hearing in the Town of Vail Community Development Department. Pfease call 970-479-2138 ior additional information. Sign language interpretation is available upon request, with 24-hour notification. Please call 970-479-2356, Telephone for the Hearing lmpaired, for information. Published February 9, 2007, in the Vail Daily. Page2 t Variance Application for Review by tl Planning and Environmental Commiss DeDarBnent of Community Development ZS Soutn Frontage Road, Vail, Colorado 81657 trlli g7O'479.2L28 faxt 970'479'2452 web: www'vailgov.com General Information: All prolects requiring Planning and Environmental commisron review must receive approval prior to srbmiHing a buitdins permit application. d#; il;;;d. suummar requirements for.tte P-al:l1a.l-aepror/al that is requested' An application for planntng ,nOtnu*nt"ntal Commission r|view cannot be accepted until all required information is reccived by the Commun|ty Deve|opment Department. rn" p.:.c may a|so neeu to ue reviewed by the To,vn Councri and/or the Design Review Board' Type of ApPlication and Fee: Rezoning $1300 t4ajor subdivision $1500 wlrnor Subdivision $650 Eremotion Plat $650 r'-iinor Amendment to an SDD $1000 New Special Development Distrlct $6000 ttaior Amendmentto an SDD $6000 Major Amendmentto an SDD $1250 r no exterior modifrations) JAN 29 TOWI\ iii tr D C tr n If n tr -dql no {ooc \, EI tr tr tr tr tr tr tr Conditional Use Permit Floodplain Modification Mlnor Exterior Alteration Major b<terior Alteration Development Plan Amendment to a DeveloPment Plan Zoning Code Amendment Varia nce Sign Variance $6s0 $400 $6s0 $800 $1500 $250 $1300 $s00 $200 Location of the ProPosall Physical Address: Name(s) of Owner(s): Owner(s) Signature(s): Nanre of APPllcant: Maiting Address: E-mail Address: (Contact Eagle Co, Assessor at 970-328-8640 for parcel no') tg*ff*3%osj' Page 1 of 6 F tc',1ev\FORMS\Parmits\Planning\PECwariance'ooc *****++*************+t*****+++++{r+++***************lr**+*******f*********'i***********'}{'*****+ TOWN OF VAIL, COLORADO Statement +*+*********ff+*+*++++++t++++t*******+*********f*t+*{.*******'}tfittf*****,t**+**ft*+**l*t**{t+* Staternent. Number: RO?OOOOO92 Amount: $500.00 Ot/29/2OO702:27 Pl4 Palments Method: Check Init: 'fSl{otsatsion: 781,/sNovlDoN & HOPKINS Permit, No: P8C07000? Tl4)e: PEC - Variance Parcel No: 2101- 053 - 0101-9 Site Addrees: 805 POTaTO PATCH DR VAIIJ Location: 805 POTATO PATCII DR. Total Fees: S5OO. O0 Thia Palment: $500.00 Total ALIJ Pmt6: $5OO-00. Balance: 50.00 +********'t'|'|**'t*****************++**********t***atl'{'*++***+*+**+**++++**+rf+***r****f**+++** ACCOI.JNT ITEM LIST: Account Code DescriDtion CurrenE Prnts PV OO1OOOO31125OO PEC APPIJICATION FEES s00.00 January 29,,2007 Town of Vail PEC Application for a Variance from the maximum allowable retaining wall height in the front setback to extend the existing retaining wall Lot29. Block 1. Vail Potato Patch SIIS, We are proposing to extend the existing retaining wall 50 feet to the \,!'est, at an height of l0 feet to l2 feet above the proposed driveway, and to the south 27 feet at a height of 12 feet sloping to the south to a height of 3 feet above grade. The average grade of this lot is approximately 50 percent. The maximum grade of the heated driveway is 8 percent. The existing back out of the garage distance is now 20 feet. The original 134 foot wall was granted a variance in 1990. The extreme topographic conditions of this site created a unique development situation with the driveway maximum slope of 8olo being the guiding design factor. The proposed new back out ofthe garage and turn out distance is an improved 30 to 35 feet. The existing residence blocks any view ofthe existing wall from the south and is not seen from Potato Patch Drive to the north or from the west or east. The proposed garage addition will also block any views of the extended wall. We believe that the strict and literal interpretation of the zoning code would be an additional hardship to an already difficult site. The owners would love to continue to live in their home and are proposing an elevator to access tJre lower levels. The only place for the elevator was in the east garage bay This lead to a garage expansion and the driveway and retaining wall expansion. The apartment evolved out ofthe space created between the garage floor level and the distance down to grade below. Please contact me ifyou have any questions. Sincerelv. qppfu-n +bpLu, Pamela W. Hopkins. AIA Partner PO Box 3340 . Vail, Colorado 81658 o 970-476-2201 . 970-476-7491(F) o 5nordonflopkins.com January 29,2007 Town of Vail PEC RE: lot 29 and 30, Block l, Vail Potato Patch Adjoining property owners: TRACT A: Town of Vail, 75 South Frontage Road, Vail, CO 81657 Lot 5 and 6: Diane J. Boyer, PO Box 456,Yail, CO 81658 PO Box 3340. Vail, Colorado 81658.970-476-2201 .970-476-7491(F). Snowdontlopkins.com Department of Community Development 75 South Frontage Road Vail, Colorado 81657 970-479-21 38 FAX 970-479-2452 www.ci.vail.co.us Snowdon and Hopkins Architects c/o Pam Hopkins P.O. Box 3340 Vail, CO 81658 February 7,2007 Re: Request for a variancefor a retaining wall exceeding the maximum height permissible under theCode/Lots 29, Block 1, Vail potato patch Ms. Hopkins, This letter is being sent in response to your variance application to construct a retaining wall in excessof three feet within the front setback. Siaff has performed a review and the following ar6 th" commentsthat need to be addressed prior to moving fonrard with scheduling on a planning Commission alenOa: ' The proposed driveway and turn-around shall be clearly depicted on the site plan.o lhow all the required parking for the unit on the site plan. ' Show a limits of disturbance and erosion control fence on the site plan.r Provide an erosion control fence detail.r The Public Works Department believes that it is possible to bench the proposed additionalretaining wall to co,me i1!o greater compliance witfr the Title 14, Design Siandaros, Vail TownCode. Options for benching the retaining wall should be explored and shared with staff. lt maynot be possible to meet the three fool maximum height requirement for retaining watts witnin tnefront setback, however, a combination retaining wall, may have more likelihood of a staffrecommendation for approval.r All retaining walls will need to.be designed to support the road above. Please review these comments and contact me at 970-479-2148 if you have any questions. please respond at ypur earliest convenience to avoid any unnecessary oelay. In order to remain on theFebruary 26tr Planning and Environmental Commiision agenda please have all the items identifledabove satisfactorily addressed and revisions submitted no la-ter ttran reoruary r Ofr "i s,oo p.;. --' Regards, /\ l) A nrt trja*r-. l,)'^M Warren Campbell I Senior Planner Cc: File {S "tctc"eoe*o Status: I Approved Conttuunffy DEVELopMENT Rounnc Fonm I Approved with conditions fi Denied Routed To:George Chalbero, PW Date Routed:01t30t07 Routed By:Wanen Campbell Date Due:02t07t07 Description of work:Variance request to extend existing retaining wall which exceeds 6 feet in height Address:805 Potato Patch Drive Legal:Lot: | 29 | Block: | 1 lSubdivision: lVailPotatoPatch Comments:Date Reviewed: Need additional review bv Fire Provide a title Show and turnaround. Show reouired Show limits of disturbance fence. Provide an erosion control detail. rock fence. Wall can be benched. No walls over 6'. Proposed wall must be designed to hold the road above. More comments with revisions. MARCH 7,2007 CERISOLA RESIDENCE LOT 29, BLOCK 1, VAILiPOTATO PATCH TOWN OF VAIL LOT 29: 23,422 SQUARE FEET ZONING: TWO FAMILY PRIMARY/SECONDARY AI,LOWABLE GRFA: .46 < 10,000 SF : 4,600 SF .38 > 10,000- 15,000 SF: l'900 SF .13 > 15,000-23,4225F -- 1094.86 SF TOTAL ALLOWABLE GRFA: 7594'86 SQUARE FEET SQUARE FOOTAGE CALCULATIONS: MAIN LEVEL: EXISTING MASTERBEDROOMLEVEL: EXISTING FAMILY ROOM LEVEL: EXISTING 2076 SF 2427 SF 956 SF PROPOSED 156 SI.' PROPOSED 659 SF PROPOSED 303 SF 5.,151 TOTAL EXISTING AND PROPOSED GR-FA IS 6577 SF GT\RAGE FOR THREE CARS IS 887 SF SI I'E COVERAGE <20% EXISTING 2476 SF + PROPOSED 648 SF TOTAL SITE COVERAGE :3124 SF = l3'3% 6/ l,l I 51'l PoBox3]40.Vai|,CoIorado81658.970.476.2201.970.476.7491(F).SnowdonHopkins.com '*t!,". American tnnd Title Association Commitment - 1982 TITLE INSURANCE COMMITMENT BY rstewartI r title guaranty company Order Number: 6038331 We agree to issue policy to 1,ou according to the terms of the Commitment. When *'e shorv the policy amount and your name as the proposed insured in Schedule A, this Commitment becomes effective as of the Commitment Date shorvn in Schedule A. lf the Requirements shown in this Commitment have not been met lvithin six months after the Commitment Date, our obligation under this Commitment lvill end. Also, our obligation under this Commitment rvill end rvhen the Policy is issued and then our obligation to you rvill be under the Policy. Our obligation under this Commitment is limited by the follorving: The Provisions in Schedule A. The Requirements in Schedule B-1. The Exceptions in Schedule B-ll. The Conditions on Page 2. This Commitment is not valid rvithout SCHEDULE A and Sections I and Il of SCHEDULE B. THIS COMMITMENT IS NOT AN ABSTRACT, EXAMINATION, REPORT OR REPRESENTATION OF T'ACT OR TITLE AND DOES NOT CREATT AND SHALL NOT BE THE BASIS OF ANY CLAIM FOR NEGLIGENCE, NEGLIGENT MISREPRESENTATION OR OTHER TORT CLAIM OR ACTION. THE SOLE LIABILITY OF COMPANY AND ITS TITLE INSURANCE AGENT SHALL ARISE UNDER AND BE GOVERNED BY PARAGRAPH 4 OF THE CONDITIONS. IN WITNESS WHEREOF, Stetvart Title Guaranty Company has caused its corporate name and seal to be hereunto affixed bv its dulv authorized officers on the date sholn in Schedule A. Countersi sned: Stewall '['itle of Co]orado - Vail Division 97 Main St.. Suite W-201 Edu,alds. CO 81632 stewart .fffr'f..c"^-"" fJ.It."_'l':.a'i:i 1?i.. r308 .€f1t'sY Order Number: 6038331 I of 2 Commitment - 235 WO Disclosure COMMITMENT FOR TITLE INSURANCE SCHEDULE A 1. Effective Date: November 27. 2006 at 8:00 a.m. 2. Policv or Policies To Be Issued: Order No.: 6038331 Amount of Insurance (a) A.L.T.A. Owner's Proposed Insured: TO BE DETERMINED (b) A.L.T.A. Loan (Standard) 3. The estate or interest in the land described or referred to in this Commitment and covered herein is: Fee Simple 4. Title to the Fee Simple estate or interest in said land is at the effective date hereof vested in: |.at29: LARCH, S.A., A PANAMANTAN CORPORATION [,ot 30: CALUMET HOLDINGS. S.A.. A PANAMANIAN CORPORATION 5. The land referred to in this Commitment is described as follows: LOTS 29 and 30, ' BLOCK I, VAIL/POTATO PATCH, According to the plat recorded March 5, 19'74in Book 233 at Page 629 as Reception No. 12952'1 . COUNTY OF EAGLE STATE OF COLORADO. Purported Address: STATEMENTOFCHARGES 807 Potato Patch Drive These charges are due and payable Vail, Colorado 8 1657 before a Policy can be issued: PREMIUM: Mortgage: $100.00 STEWART TITLE C UARANTY COMPANY Commitment - Schedule A Page I of I COMMITMENT FOR TITLE INSURANCE SCHEDULEB-Sectionl REQUIREMENTS Order Number: 6038331 The following are the requirements to be complied with: 1. Payment to or for the account of the grantor(s) or mortgagor(s) of the full consideration for the estate or interest to be insured. 2. Proper instrument(s) creating the estate or interest to be insured must be executed and duly filed for record, to wit: 3. This report is for informational purposes only. No policy will be issued. STEWART TITLD G UARANTY COMPANY Corumiament - Schedule B I Page I of I Order Number: 603&13 | COMMITMENT FOR TITLE INSURANCE SCHEDULEB-Section2 EXCEPTIONS Order Number: 6038331 The policy or policies to be issued will contain exceptions to the following unless the same are disposed of to the satisfaction of the Company: 1 Rights or claims of parties in possession, not shorvn by the public records. 2. Easements, or claims of easements, not shown by the public records. 3. Discrepancies, conflicts in boundary lines, shortage in area, encroachments, or any facts, which a correct survey and inspection of the premises would disclose, and which are not shown by the public records. 4. Any lien, or right to a lien, for services, labor or material heretofore or hereafter furnished, imposed by laws and not shown by the public records. 5. Defects, liens, encumbrances, adverse claims or other matters, if any, created first appearing in the public records or attaching subsequent to the effective date hereof, but prior to the date the proposed insured acquires of record for value the estate or interest or mortgage thereon covered by this commitment. 6. Unpatented mining claims, reservations or exceptions in patents, or an act authorizing the issuance thereof; water rights, claims or title to water. 7. Any and all unpaid taxes and assessments and any unredeemed tax sales. 8. The effect of inclusions in any general or specific water conservancy, fire protection, soil conservation or other district or inclusion in any water service or street improvement area. 9. Reservations or exceptions in Patents, or in Acts authorizing the issuance thereof, including the reservation of a right of way for ditches or canals constructed by the authority of the United States, as reserved in United States Patent recorded August 15, 1935 in Book 93 atPage278. 10. Restrictive Covenants recorded March 5, l9'l4lnBook233 at Page 628 as Reception No. 129526and as amended in instrument recorded September 24, 1975 in Book 241 aIPage 950 as Reception No. 138069. 1 1 . Alf matters shown on the plat of VailiPotato Patch, recorded in Book 233 at Page 629 as Reception No. 129527. t2. Easement Deed dated August6, l98l recorded at Book 3T7,Page 614 as Reception No. 223976. (The above items affect both [,ots 29 and 30) STEWART TITLE G UARAN'I'Y COMPANY Commitmelt - Schedule B 2 Page I of 2 Order Numb€r: 6038331 13. A Deed of Trust dated February 18, 1W2, executed by S.A. Iarch, a Panamanian Corporation, to the Public Trustee of Eagle County, to secure an indebtedness of $400,000.00 in favor of California Commerce Bank recorded December 28, 1993 in Book 628 atPage 668 as ReceptionNo.5%t729. 14. A Deed of Trust dated Novemberg,Iggg,executed by tarch, S.A., a Panamanian Corporation, to the Public Trustee of Eagle County, to secure an indebtedness of $1,000,000.00 in favor of California Commerce Bank recorded December 28, 1999 as Reception No. 718962. (The above items affect l,rr,tzg) STEWART TITI,E GUARANTYCOMPANY Cornmitment - Schedul€ B 2 Page 2 of2 Oder Numbcn 6038331 DISCLOSURES Pursuant to C.R.S. l0-lI-122, notice is hereby given that: A. THE SUBJECT REAL PROPERTY MAY BE LOCATED IN A SPECIALTAXING D]STRICT; C. A CERTIFICATE OF TAXES DUE LISTING EACH TAXING JURISDICTION SHALL BE OBTAINED FROM THE COUNTY TREASURER OR THE COUNTY TREASURER'S AUTHORIZED AGENT; INFORMATION REGARDING SPECIAL DISTRICTS AND THE BOUNDARIES OF SUCH DISTRICTS MAY BE OBTAINED FROM THE BOARD OF COUNTY COMMISSIONERS, THE COUNTY CLERK AND RECORDER. OR THE COUNTY ASSESSOR NOTE: ColoradoDivisionoflnsuranceRegulations3-5-l,ParagraphCofArticleVllrequiresthat"Everytitleentity shall be responsible for all matters which appear of record prior to the time of recording whenever the title enrity conducts the closing and is responsible for recording or filing of legal documents resulting from the transaction which was closed." Provided that Stewart Title of Cotorado - Vail Division conducts the closing of the insured transaction and is responsible for recording the legal documents from the transaction, exception number 5 will not appear on the Owner's Title Policy and the Lender's Title Policy when issued. NOTE: Affirmative Mechanic's Lien Protection for the Owner may be available (typically by deletion of Exception No. 4 of Schedule B, Section 2 of the Commitment from the Orvner's Poticy to be issued) upon compliance with the following conditions: A. The land described in Schedule A of this commitment must be a single-family residence, which includes a condominium or torvnhouse unit. B. No labor or materials have been furnished by mechanics or materialmen for purposes of construction on the land described in Schedule A of this Commitment within the past 6 months. C. The Company must receive an appropriate affidavit indemnifying the Company against unfiled Mechanic's and Materialmen's Liens. D. The Company must receive payment of the appropriate premium. E. If there has been construction, improvements or major repairs undertaken on the property to be purchased, within six months prior to the Date of the Commitment, the requirements to obtain coverage for unrecorded liens will include: disclosure of certain construction information; financial information as to the seller, the builder and/or the contractor; payment of the appropriate premium; fully executed Indemnity agreements satisfactory to the company; and, any additional requirements as may be necessary after an examination of the aforesaid information by the Company. No coverage will be given under any circumstances for labor or material for lvhich the insured has contracted for or agreed to pay. NOTHING HEREIN CONTAINED WILL BE DEEMED TO OBLIGATE THE COMPANY TO PROVIDE ANY OF THE COYERAGES REFERRED TO HEREIN, UNLESS THE ABOVE CONDITIONS ARE FULLY SATISFIED. Stcrvart Title of Col(n ado - Vail Division File Number: 603U33I Disclosures B. MINERAL DISCLOSURE Order No: 6038331 To comply with the provisions of C.R.S. l0-ll-123, the Company makes the following disclosure: (a) That there is recorded evidence that a mineral estate has been severed, leased or otherwise conveyed from the surface estate and that there is a substantial likelihood that a third party holds some or all interest in oil, gas, other minerals, or geothermal energy in the property; and (b) That such mineral estate may include the right to enter and use the property without the surface owner's permission. NOTE: THIS DISCLOSURE APPLIES ONLY IF SCHEDULE B, SECTION 2 OF THE TITLE COMMITMENT HEREIN INCLUDFS AN EXCEPTION FOR SEVERED MINERALS. Stewart 'Iitle of Colorado - Vail Division File Number: 6038331 Mineral Dsclosure Rev.07/2001 Privacy Policy Notice PURPOSE OF THIS NOTICE Title V of rhe Gramm-Leach-Bliley Act (GLBA) generally prohibits any financial institution, directly or through its affiliates, from sharing nonpublic personal information about you with a nonaffiliated third party unless the institution provides you rvith a notice of its privacy policies and practices, such as the type of information that it collects about you and the categories of persons or entities to whom it may be disclosed. In compliance with the GLBA, we are providing you with this document, which notifies you of the privacy policies and practices of Stewart Title Guaranty Company and Stelvart Title of Colorado - Vail Division. We may collect nonpublic personal information about you from the following sources: . lnformation we receive from you, such as on applications or other forms. . Information about your transactions we secure from our files, or from our affiliates or others. . Information we receive from a consumer reporting agency. . lnformation that we receive from others involved in your transaction, such as the real estate agent or lender. Unless it is specifically stated otherrvise in an amended Pri vacy Policy Notice, no additional nonpublic personal information rvill be collected about you. We may disclose any of the above information that we collect about our customers or former customers to our affiliates or to nonaffiliated third parties as permitted by law. We also may disclose this information about our customers or former customers non affiliated companies that perform services on our behalf. WE DO NOT DISCLOSE ANY NONPUBLIC PERSONAL INFORMATION ABOUT YOU WITH ANYONE FOR ANY PURPOSE THAT IS NOT SPECIFICALLY PERMITTED BY LAW. We restrict access to nonpublic personal information about you to those employees who need to knorv that information in order to provide products or services to you. We maintain physical, electronic, and procedural safeguards that comply with federal regulations to guard your nonpublic personal information. Some states give you the right to access and correct nonpublic personal information. You may contact us in writing at out Home Office, if your state larv gives you this right. Revised 6/05 , CONDITIONS I. DEFINITIONS (a) "Mortgage" means mortgage, deed of trust or other security instrument. (b) "Public Records" means title records that give constructive notice of matters affecting your title - according to the state statutes where your land is located. LATER DEFECTS The Exceptions in Schedule B - Section ll may be amended to shorv any defects, liens or encumbrances that appear for the first time in the public records or are created or attached between the Commitment Date and the date on which all of the Requirements (a) and (c) of Schedule B - Section I are met. We shall have no liability to you because of this amendment. EXISTING DEFECTS If any defects, liens or encumbrances existing at Commitment Date are not shown in Schedule B, we may amend Schedule B to shown them. If we do amend Schedule B to show these defects, liens or encumbrances, we shall be liable to you according to Paragraph 4 below unless you knew of this information and did not tell us about it in writing. LIMITATION OF LIABILITY Our only obligation is to issue to you the policy referred to in this Commitment when you have met its Requirements. If we have any liability to you for any loss you incur because of an error in this Commitment, our liability will be limited to your actual loss caused by your relying on this Commitment when you acted in good faith to: Comply with the Requirements shown in Schedule B - Section I' Eliminate with our written consen, .nlt"*""O,,ons shown in Schedule B - Section II. We shall not be liable for more than the Policy Amount shown in Schedule A of this Commitment and our liability is subject to the terms of the Policy form to be issued to you' 5. CLAIMS MUST BE BASED ON THIS COMMITMENT Any claim, whether or not based on negligence, which you may have against us concerning the title to the land must be based on this Commitment and is subject to its terms. Order Number: 603833I 2 of 2 Commitment - 235 WO Disclosure 3. 4. Hepworth-Pawlak Ceotechnical, lnc. 5020 County Road 154 Glenwood Springs, Colorado 81601 Phone: 970-945-7988 Fax: 970-945-8454 email: hpgeo@hpgeotech.com HEPWORTH - PAWLAK GEOTECHNICAL February 14,2007 Mr. Pedro Cerisola c/o Snowdon and Hopkins Architects Attn: Pam Hopkins P.O. Box 3340 Vail, Colorado 81658 Subject: JobNo. 1060938 Additional Recommendations for Retaining Walls, Proposed Addition to Cerisola Residence, l.ot 29, Potato Patch, 805 Potato Patch Rosd. Vait. Colorado. Dear Mr. Cerisola and Ms. Hopkins: As requested, we are providing additional recommendations for deep foundation walls of the addition and for the proposed site walls along the west and north property lines. Hepworth-Pawlak Geotechnical, Inc. previously conducted a subsoil study for design of foundations at the site and presented our findings in a report dated Decemb er 29, 2006, JobNo. 106 0938. The uphill wall of the addition will be about 2l feet tall. Part of the existing uphill foundation wall next to the proposed addition will be underpirmed to a depth of about 8 feet. Tied-back shoring walls are proposed to support the cut face ofthe addition and the cut below the existing foundation. Additional design parameters are requested for the shoring wall and deep wall designs. The site walls are proposed to be constructed roughly 3 to 5 fcct inside the propeity lines anti be up to 12 feet high. The north wali wiil be an extension ofthe existing wall below Potato Patch Road and will need to support any road surcharge in addition to the hillside slope. Foundation Walls: the proposed uphill foundation walls are much taller than assumed in our previous study report. Walls that are grealer than about l5 feet tall should be designed for a uniform earth pressure of 25 H in psf where H is the wall height in feet. This pressure assumes the walls will be restrained against lateral movement. We expect that the shoring wall for the addition will be constructed against the cut face and consist of a soil nail design for permanent earth support. The shoring for the cut below the existing Parker 303-841-7119 o Colorado Springs 719-633-5562 . Silverthorne 970-468-1989 Mr. Pedro Cerisola February 14,2007 Page2 foundation will probably require tie-backs (rather than soil nails) to restrain the shoring wall against lateral movement. A shoring contractor should be contacted for specific design and construction details. with either shoring system, an underdrain should be provided behind the wall that connects to the perimeter foundation drain. Based on our exploratory boring profile, the lower part ofthe excavations could be into sandstone bedrock. The rock should be relatively competent with respect to slope stability and have a bedding dip generally down to the north. site walls: The proposed walls are probably too close to the property lines to use soil nail or mechanically stabilized earth walls without extending offof the property. A possible wall type consists of micro-piles that use closely spaced vertical piles at the wall face and battered piles behind the face. The piles are connected at the top with a cap beam and the vertical piles are faced with concrete or other wall material. An underdrain should be provided behind the wall facing. A shoring contractor should be contacted for specific design and construction details. We will be available to further discuss the proposed excavation plans when requested. In the meantime, if you have any questions or need further assistance, please call our office- Sincerely, HEPWORTH - PAWLAK GEOTECHNICAL. INC. Steven L. Pawlak, P.E. SLPivad JVA, Inc. - Attn: Derek Henderson, PE Beck Building Company - Attn: Frank Payne ffi'.r& wtrs Job No- 106 0938 GE tecfr .llY'ETTER March 8, 2007 Snowden and Hopkins Architects, P.C' PO Box 3340 Vail. Colorado 81658 '-''' AffitiOlr-.|ft. 416p1-14tuking';'' -''' -': :'':' -n"-: l RE: Ms. Hopkins: Recommendations for Retaining Wall Systems for the FroposeA Addition to the Cerisola Residence, Lot 29, 805 Potato Patch Road, Vail, Colorado. Due to the proximity of the retaining wall !o lfre grop9'lv lin"-1i| Potato F"t"t no"d, a fiil wail, such as a g-osynthetically reinforce!.soil1v,3lf , is not feasible. A more traditional soil nail or tieback wall could posslDry ;;;flil;ih. the lxistins gtllitieg undel the qo4!a$ tw9ul{,!!outt!-f = permanent easement. Given the above restraints, we agree with the recommendations of HP Geotech, and believe tn"i" ti"r6pile wallis the best retaining wallsystem f* ihi. ;it". A micropile wall generally consists of vertical and near u"rti"rf , tt"ll diameieiorilled'pites' thepiles are connected at the top ;iiil;p, or grade u""m. Ati"r installat'ron, a verticalexcavation takes ilri* i" ti""i u:t ine pires,:andlshotsrete is applied.to the face of the wall. The shotcrete can tn"n U" used to attach a facing material' such as segmentaliretainils wall biocks ,;,. , 20300 W. HighwaYT2,Arvada, CO 80007 r 303i279-4458 o lavtQtl'279-0908 ' www'yenter'com we have recently constructed a similar type of wall in vail. The scolnick residence at 2g35 Basingdale Boulevard in Vailwas experiencing a failure under the road due to an unexpected drainage line. Micropiles were drilled from the edge of the road to act as a retaining wall, and to support the edge of the roid, The piles were then faced with shotcrete' The plans showed a boulder stacked wall in front of the micropiles' We are available to discuss these options if you need any more information. lf you have any questions, please do not hesitate to call. Respectfully, 7<e-r.;- - +i, ' -::----'---j:q.'=::-;r.,.:- - :-;:=-. r. .{'. :.i:t-il;:: :?-- :'=i. r' : = : :i : :::':--::i-;-_:-:- =a i Kevin Brooks, EIT Yenter ComPanies, Inc. ' Hepworth- Pawlak Geotechnical, Inc. P. O. Drawer 1887 Silverthome, Colorado 80498 Phone; 970-468-1989 Fax: 970-468-5891 emailr hpgeo4@hpgeotech.com HEPWORTH - PAWLAK GEOTECHNICAL February 27,2007 Mr. Pedro Cerisola c/o Snowdon and Hopkins Architects Attn: Pam Hopkins P. O. Box 3340 Vail, Colorado 81658 JobNo. &7 Wl7 Subject: Rocldall HazudEvaluation forLots 29 znd3Q PotatoPatch" Block l, 805 and 807 Potato Patch Road, Vail, Colorado. DearMr. Cerisola and Ms. Hopkins: As requested, we have conducted a rocldatl hazard waluation for Lots 29 and 30 in the Potato Patc[ Block 1, Vail, Colorado. The project site and vicinity are shown on Figure l. Hepworth-Pawlak Geotechnical (2006 alrd}A0l has performed a subsoil study for foundation design of a proposed addition on Lot 29. Our services for this study were performed according to our January 29,2007 professional services agreement to Snowdon and Hopkins Architects. A field reconnaissance of the project site was made on lanuary 29,200'l to observe and map potential rockfall start areas, paths and runouts in the pro-iect vicinity. This report $nunarizes our findings and presents orn conclusions and recomrnendations. Summary of Findings: l. Lots 29 and 30 are not in potential rockfall paths or nrnouts associated with the prominent sandstone outcrops that are located to the north ofthe Potato Patctr, see Figure 2. The proposed addition onLot 29 is not er<posed to a rockfall risk from the upslope outcf,ops and theproposed addition should not increase the inherent roclf,all risk to oristing buildings in the area. As discussed in Finding 3 below, Glenwood Springs 970-945-7988 . Parker 303-841-7119 . Colorado Springs 719-633.556?. Mr. Pedro Cerisola February 27,2N7 Page2 precautions during constnrction ofthe addition should be taken to prevent dislodgment of on-site rock blocks. 2. Serreral small rock blocks aDd orscrops are pres€nt on Lot 30. These oscrops and blocks are potential souroes for rocl&ll to down slope areas to the south oflot 30. I\fany of these potential rocl&ll blocks will likely be removed during construction of a residence on Lot 30. This will reduce, but not totally eliminatg the rockfall risk to oristing buildings located down slope to the south oflot 30. 3. Precautions should be taken during construction on Lots 29 and 30 to prevent - dislodgment of on-site rock blocks from the er(cavations and near by hillside. Dislodged rock blocks could develop into rocldall to could potentially damage doum slope buildings, soe Figure l. Proposed llwclopment: At the time of this study, a 530 square foot addition was being considered on the western side of the existing house on l,at 29, see Figure 2. Dwelopment plans were not available for Iot 3Q but a residence may be built on this lot sometime in the future. Tlre proposed addition onlat 29 will be a two story structure above a basement level. Becanse ofthe steep hillside on the lot relatively deep construction excavations will be needed of the proposed addition. When building and grading plans for Lot 30 are availablg we should review tle plans to determine ifthe proposed development is consisted with the finding ofthis study. Site Conditions: Lots 29 and 30 are located on a v€ry steep, south-facing hillside that lies to the east of Red Sandstone Creelg see Figure l. The hillside on the two lots has an average slope of about 45 percent. The hillside becomes steeper down slope. Down slope ofthe two lots tlre hillside has an average slope of about 56 percent. The hillside transitions to a moderately sloping bench with an average slope ofabout 20 percent to the north ofthe two lots. IMajor drainages do not cross tlrough the two lots. Single family residences are located on many of the nearby lots, see Figure l. Multi-family residences are located near the botlom ofthe hillside to the snrth. Vegaaion on the hillside is mostly sage and other brush. JobNo.4Ol 0017 cA5tecrr Mr. Pedro Cerisola February 27,2007 Page 3 Geotogic Setting: The regional geologc map by Scott and Others (2W2) shows thatthe two lots are undedain by interbedded arkosic sandstong conglomerate and shale in the middle Pennsylvanian-age, Mnturn Formation. Bedding in the area strikes to the northeast and dips moderately to the northwesl see Figure 2. On the two lots the formation rock is usrally covert by a thin layer of pre-Bull Lakeage, g)aciil till, btrt a small outcrop of sandstone is present in the central part oflot 30. The on-site rock blocks in the northern part of Lot 30 are associated with the till. Six and one-half feet of till was encountered in our exploratory boring on Lot 29 (Ilepworth-Pawlak Geotechnical, 2006). Rockfall Hazerds: Potential rockfall hazards in the pro.iect area are shown on Figure 2. This map is based on our field observationg aerial photograph interpretations and review ofpublished regional roclfall information (Schmueser and Associates, 1984 and the Town of Vail 2000). The prinary rockfall bazud is from the prominent sandstone outcrops located to the north of the Potato Pdch. I.dts29 and 30 are not located in this potential hazard area. A secondary rockftllbaad is associated with the local sandstone outcrops and till related rock blocks on the steep hillside in the vicinity of Lots 29 aod30. This secondary fuzard area does not pres€ot a pdentid tlneat to dwelopment ofLo/rs29 and 30 because constnrction on these two lots will be in the potential rockfall start ar€a. Construction on these two lots should reduce the poturtial risk to down slope building if precautions are taken during construction to prev€nt dislodgment ofthe rock blocks and rmstable outcrops on the hillside near the construction sites- Limitations: This study was conducted according to generally acc€pted engineering geology principles and practices in this area, d this time. We make no warranty either express or irnplied. The conclusions and recommendations submitted in this report are based onourfield observations, theproposed dwelopment shownonFigure2 and our experience in the area. This report has been prepared exclusively for our client and is an evaluation of potential risks to dwelopment on the two lots associated with rocldall. Job No. 4ffl 0017 c&hacrr Mr. Pedfo Cerisola February 27,2OO7 Page4 We are not responsible for technical interprAAions by others of our information. We should rwiew development plans for l,ot 3Q when available, to determine if they are consist€d with the inted of our reoommendations pres€nt€d in this report. If you have questions or need further assistancg please call our office. Sincerely, HEPWORTH _ PAWLAK GEOTECHNICAL. INC. RalphG. Mock Engineering Geologist Reviewed by George W. Benecke III, P. E. RGMTI attachmeds Figure I - hoject location Figure 2 -Potential Rockfdll Areas Wr;f# Job No. 4fl 0017 cA8tach Mr. Pedrc Cerisola February27,2007 Page 5 RETDRENCES Hepworth-Pawlak Geotechnical,zffi6, Subsoil Sndyfor FoundotionDesign, Proposed Addition, Lat 29, Potato Pstch, 805 Potato Patch Drive, Yail, Colorado: Prepared for Pedro Cerisola, do Snowdon and Hopkins Architects, Vail, Colorado (Job No. 106 0938, Deoemha 29, 2W). Hepworth-Pawlak Geotechnica! 20O7, Addifiorul Recommendations for Retaining Wolls, ProposedAdditiontoCerisola Residence, Lot 29, pototo Patch, Potsto Pdch Rd, Vail, Colorafu: Prepared for Pedro Cerisolg c/o Snowdon and Hopkins Architects, Vait Colorado (Job No. 106 0938, February 14,2007). Schmueser and Associates, 1984, Roclfall Study - Tovwr of Vail: Prepared for the Town of Vail (Novernb a, 29, 1984). Scott, R B. and Olher+ 2@\ GeologtMq of the Vail Yest Qaahangle, fugle Courrty, Coloradoy'U. S. Geological Survey, Mscellaneous Field Studies Map 2369, Version 1.0. Town of Vail ,2W0, Aficial RuSall Hazud Map, Twwt of lrail: Prepared by the Town of Vail, VaiI, Colorado (Adopted by the Toum Council on October l7,20o,O). JobNo.407(X)17 ct&ecrr € P - .*JK 153* lfeR+- l.eeE" IEESlgE,'oJ@E co9('ro :.F E|eg a g. i|;c E - f,E ElgE € flEE flEI 3lE #lEE t|F9u $IFgE 407 0017 Potato Patch Lots 29 and 30 Potential Rockfall Areas HEFVI:ORTH - PAWLAK GEOTECHNiCAt- iit:r,.'rii i.:r !.::, r i,. ', . ',, '. . !.-l.r r.'.,l:r:r F, , ,.i r:. ,.:.. 'r,r. n .l :: ',:,1 . . , i r.'1,, ,t,(, i : .' . !.i :: - - ir'. . t '\ Lr;a-!,i:,.'-.::; ('.:r: ri: l'iri.,i'i,i!. ",,ii-, :. . SIJBSOILSTUDY FOR FOI]NDATION DESIGN PROPOSED N)DITION LOT Z9,POTATO PATCI| 805 POTATO PATCH DRIVE VAJL, COLORADO JOB NO. 106 0938 DECEMBER 29,2A06 PREPAREDFOR: MR PEDRO CTRISOI-A C/O SNO}VDON A}ID HOPKINS ARCIIITECTS ATTN: PAM HOPKINS P. O. BOX3340 VAIL, COLORADO 81658 i',r,-iiq'1 -1q11-i+j-71j4 e i.'1rl1r;;1J1-, S1.r'irrgs ;l:)-6rr iit',1 o :,!l\.(!lh(rr-jt,-. t)7i-JirS-l.t,.,tt dFtecm fi PT]RPOSE AIYD SCOPE OF ST1JDY This report presenls the results of a subsoil study lbr a proposed acldition to an exising residence located atLot29- Potato Parch- 805 Poraro Patch Drive. Vail- Colorado. The project site is shou'n on Figure 1. The purpose of the strrdv rvas to develop recommendalions for the tbundation design. The study v!'as coriducled in accordance with our agreement for geotechnical engineering services to Snowdon and Hopkins Architects dated October 24-2006- An exploratory boring was drilled to obtain informalion on the subsurtace conditions. Samples of the subsoils and bedrock obtained during the lield exploration rvere tesled in the laboralory to determine their classification and other engineering characteristics. The results of the fieid exploration and laboralory lesting were analyzed ro develop recommendalions for foundarion types- depths and allowable pressures for the proposed building foundation. t his report summarizes the data obtained during this study and presenls our conclusions- design recommendalions and orher geotechnical engineering considerations based on the proposed construction and the subsurface conditions' . encountered - PROPOSED CONSTRUCTION The proposed addirion will be a two story slructrre above a basement level and anached lo the west end of the existing residence as shorvn on Figure I. Grcund floor will be slab- on-grade. Grading for the structure is assumed to be relatjvely minor wjth cut depths up to aboul I0 feet. We assume relatively light foundation loadings- typical of the proposed type of construction. Ifbuilding loadings, localion or grading plans change signilicantly from those described above, we should be nodfied to re-evaluale the recommendations contained in rhis report. SITE CONDITIONS The site is occupied with a single family, one and two slory residence with a lower walkout level. Vegetation consisls oflandscaping- grass. weeds, aspen and evergreen c€Stectlob No. 106 0918 t;ees- The glound surlace slopes steepll down lo lhe sourh ar a gr-irde of abour 45 percenr- The north sjcle ol'the residencb is an asphalt par,ed drireuar.. FIELD EXPLORATION The lleid exploration lbr the projecr was conducted on December 15. 2006. One exploratory boring was drilled just off the end of the existing driveway at lhe localion shown on Figure I lo evaluate the subsurface conditions. The boring was advanced with 4 inch diameter conlinuous llighr augers powered by a rruck-mounred cME-55 drill ilg. The boring was logged by a representative of Hepu,orth-Par+Jak Georechnical. lnc. Samples of the subsoils were taken with 1% inch and 2 inch l.D. spoon samplers- The samplers were driven inro the subsoils al various depths rvith blows from a 140 pound hammer l-aliing 30 inches. This test is simi.lar to the standard penetralion test described by ASTM Method D-l 586- The penetration resistance values are an indicarion of the relativedensityorconsisrencyofrhesubsojlsandhardnessofrhebedrock. Depthsat which the samples were taken and the penetration resislance values are shown on the Log of Exploratory Boring. Figure 2. The samples were retumed to our laboratory for review by the project engineer and testing- SI.]BSURFACE CONDITI ONS A graphic log ofthe subsurface conditions encountered at lhe site is shown on Figure 2. The subsoils consisl of about 7 t/z feet ofman-placed fill overlying silty clayey sandy gravel with cobbles. Sandstone bedrock was encountered at a depth ofl4 feet. Drilling in the upper dcnsc granular soils with auger equipment r,r'as difficulr due to the cobbles and possible boulders and drilling refusal was encounrered in the deposit. Laboratory testing performed on samples obrained from the boring included natural moisture contenl, gradation analyses and Anerburg limits. Results of gradation analyses performed on a disturbed drive sample of the weathered sandstone are shown on Figure 4. The laborarory testing is surnmarized in Table l. Job No. 106 0918 e&Btecr't --l- No liee \,vater \ .as encountered in the boring at rhe rime of drilling and rhe subsoils r.vere sliehtlv moisr ro rnoist, FOI'NDATION BEARING CONDITIONS The natural course granular soils and bedrock are adequate for support of spread fooring foundations. All existing fill should be removed from beneath fooring and floor slab areas. The sandslone bedrock rvas encounlered near 1o below expected excavalion cul depths. DESIGN RECOMMEIYDATIONS FOLTNDATJONS Considering the subsurface condirions encountered in the exploratory boring and the nature of the proposed conslruction. we recommend the building be founded with spread footings bearing on the natural granular soils- The design and conslruction crjteria presenled below should be observed for a spread footing foundation syslem. l) Footings placed on the undjsrurbed nanrral granular soils should be designed for an allowable bearing pressure of2,500psf. Footingsplaced near the uphill side of the addition at the basement level can be designed for an allowable bearing pressure of3,500 psf- Based on experience. we expect seltlement offootings designed and constructed as discussed in this section will be aboul I inch orless. 2) The footings should have a rninimum widrh of l6 inches for continuous walls and 2 feer for isolared pads. Exterior footings and footings benearh unheated areas should be provided with adequate soil cover above their bearing elevation for frost protection. Placement offoundations at leasl 42 inches below exterior arade is typically used in this area, 4) Conlintrous foundation wa.lls should be reinforced top and botrom ro span local anomalies. Foundation walls acring as retaining struclures should r) Job No. 106 09-18 e&9tecn -.t- also be clesigned to resisr laleral earth pressures as discussed in the "I oundarion and Reraining Walls" sectiorr o I rhis report. The existing iill. an1 topsoil and loose or disrtrrbed soils should be removed and the footing bearing level extended dor,r,n lo the relatively dense nalural granular soils. The exposed soils in footing area should then be moistened and compacled. If water seepage is encounlered- the fooring areas should be dewarered belbre. concrete placement. A represenlative ofthe geotechnical engineer should observe all footing excavations prior to concrele placemenl 10 evaluale bearing conditions. FOUNDAT]ON AND RETAINING WALLS Foundation walls and relaining struclures r,r,hich are laterally supporred and can be expected 1o undergo onlv a slight anrount ofdeflection should be designed for a lareral earth pressure computed on the basjs ofan equivaient fluid unit weight ofar least 50 pcf for backfill consisting of the on-site granular soils. Cantilevered rerainin-q structures which are separale from the residence and can be expected to deflect sufficiently to mobilize the full active earth pressure condition should be designed for a lateral earth pressure computed on the basis of an equivalenr fluid unit weight of at leasl 40 pcf for backfill consisting of the on-site granular soils. Backfill should nol contain vegerarion, topsoil or rocks larger rhan about 6 inches. All foundatjon and retaining slructwes should be designed for appropriate hydrostatic and surcharge pressures such as adjacent footings. lraffic, construction materjals and equipment- The pressures recommended above assume drained conditions behind the walls and a horizontal backfill surface. The buildup of water behind a wall or an upward sioping backfill surface .*'ill increase ihe lateral pressure imposed on a lbundarion wall or retaining struclure- An underdrain should be provided to prevenl hydrostaric pressrue buildup behind walls. Backfill should be placed in uniform lifis and compacted to al least 90% of rhe maximum standard Procior density ar a mojsiure conrent near oplimum. Backfill in pavemenl and walkway areas should be conrpacted to al least 95% of the maximum staldard Proctor density. Care should be taken nol lo overcompacl the backfill or use large equipmenr 5\ ol .)ob No. 106 09i8 c&5tecn -)- ncar the wall. since this could cause excessir,e lareral pressure on the $a]I. Some selllt'rltenl o1'deep lbundation uall backllJl should be expected- evetr ilthe ntalenal is placed e-orecll-v-. ancl could result in distress ro lhcilities constnrcted on rhe backljll. The lateral resistance of foundation or retaining u'all footings r.viil be a combinalion olthe sliding resistance of the footing on the foundation malerials and passive earth pressure againsi fte side of the footing. Resistance to sliding ar the bottoms of the footings can be calculated based on a coefficient offriction of0.5. Passive pressure ofcompacted backfill against rhe sides ofthe footings can be calculated using an equivalenr fluid unir weight of 400 pcl-. The coeflicienr of frjction and passive pressure valnes recommended above assume ultirnate soil strength. Suirable factors of safety should be included in rhe design to limit the strain rvhjch u'ill occur al the ulljmare strengr.h- parricularly in the case ofpassive resjstance. Fill placed against the sides ofthe lborings to resist lateral loads shoujd be compacted ro ar least 95% of the maximum srandard proclor densiry ar a moislure contenl near oDlimum. FLOOR SLABS The natural on-site soils, exclusjve oftopsoil, are suirable ro supporl lightly loaded slab- on-grade conslruction- To reduce the effecls of some differenrial movement, floor slabs should be separated from all bearing walls and columns with expansion joints which ailow unreslrained vertical movement, Floor slab control joints should be used to reduce damage due to shrinliage cracking. The requirements for joint spacing and slab reinforcemenl should be established by the designer based on experience and the intended slab use- A minimum 4 inch layer of free-draining gravel shourd be praced beneath basemenl level slabs to I-acilitate drainage. This material should consisr of minus 2 inch aggregale wirh at leasr 50?6 rerained on rhe No.4 sieve and iess inanZoh passing rhe No. 200 sieve. All fill nraterials for support of floor slabs should be compacred ro al leasl 95oh of maximum standard Proctor density al a moisture conlent near optimum. Required fill can consisl ofthe on-site granular soils devoid ofvegetalion, lopsoil and oversized rock. .lob No. 106 0938 c&5tecn -o- t.;NDI:RDRAIN S)'Sl ENI Although liee rvarer \\as not encountered during our explorarion. ir has ber'n our experience in mounlainous areas and where bedrock is shallow rhar local perched groundr,later can develop during times of heavy precipitation or seasonal runoll Frozen ground during spring runoff can creale a perched condition. We reconrmend below-grade conslrucll'on, sltch as retaining walls and basement areas, be protecled iiom wetting and hydrostatic pressure buildup by an underdrain system. The drajns should consist ofdrainpipe placed in the bottom ofthe rvall backfiil sun-ounded above ihe invert level u'ith liee-draining granular materjal, The drain should be placed at each level ofexcavation and at least I lbot below lowesr adjacent finish grade and sloped at a minirnum lTo to a suitable gravity oullet. Free-draining grannlar material used in the ttnderdrain svstem should contain less rhan 2% passing the No. 200 st-eve- less than 50o/o passing the No. 4 sieve and have a maximum size of 2 inches- The drain gravel backfill should be ar leasl I % feet deep. S]TE GRADING The risk of construcljon-induced slope insrability at the site appears low provided rhe addirion is located as planned and cut and fill depths are limited, We assume the cut depths for the basement level will not exceed one level, abour l0 to l2 feer. Fills should be limired to about 8 to l0 feet deep and nol be placed ar rhe dorvnhill side ofthe residence- Embankment fills should be compacred ro at least 95%o of the maximum slandard Proclor density near optimum moisture content. prior to fill placement, the subgrade should be carefully prepared by removing all vegetation and topsoil and compacting to at leasl 95Yo of the maxjmum standard Proclor density. The fill should be benched into the portions ofthe hjllside exceeding 20Yo prade.-' Permanent unretained cut and fill slopes should be graded at 2 horizonlal to I vertjcal or flatter and protected against erosion by revegelation or other means. The risk ofslope instabiliry will be increased if seepage is encountered in cuts and flatler slopes may be necessary. Ifseepage is encountered in permanenl culs, an investigation should be conducled 1o determine if the seepage will adversely affecr the cut stability- This olfice should review site grading plans for the projecl prior to conslmction. Joh No. 106 0918 c&Bt crt -7 - SURFACE DRAI]\JAGF, The follou'ing drainage precaulions should be observed during construclion and maintained ar ali rimes aller the addition has been completed: l) Inundation ol'the lbundation excavations and undelslab areas should be avoided during construction. 2) Exlerior backfill should be adjusted lo near oprimum moisrure and compacted to at least 95%o of the maximum standard Proctor densiry in pavemenl and slab areas and lo ar least 907o of the maximum standard Proclor density in landscape areas. 3) The ground surface surrouncling the exterjor ofrhe building should be sloped ro drain awav from the foundation in all directjons. We recommend a minimum slope of 12 inches in the llrsr l0 feet in unpaved areas and a minim'm slope of 3 inches in the firsi l0 feet in paved areas, Free-draining wall backfill should be capped wirh abour 2 feet ofthe on- site finer graded soils to reduce zurface waler infihratjon- 4) Roof downspouts and drains should discharge well beyond rhe limits of all backfill. LI]VtrTATIONS This study has been conducted in accordance with generally accepted geolechnical engineering principles and practices in this area at &is time. We make no warranty either express or implied. The conclusions and recommendations submitted in this report are based upon the data obtained from the exploratory boring drilled ar the localion in6icated on figure l, the proposed type of construction and our expedence in the area. our services do not include derermining lhe presence, prevention or possibiliry of mold or other biological contaminanrs (MOBC) developing in the future. lfthe client is concerned about MOBC, then a professional in this special field ofpracrice should be consulted. Our findings include inrerpolation and exrrapolarion ofrhe subsurface conditions identified al the exploralory boring ancl variations in rhe subsurface condirions may not become evident unlil excavalion is perlbrmed. If conditions encounlered durins Joh No. 106 09-18 c&&ecn -8- conslrtlclioll appeardill'erent fi'orn those describeci in this repon. we should be notillcd so lhat re-evaluation of the recomnrendations mav be ntade. This report has been prepared for the exclusive use by our client for design purposes- We are nol responsible for technical inlerpretalions b1'others of our information. As rhe project evolves- r.l'e should provide continued consultation and lield services during conslruction to review and monitor the implemenlation of our recommendalions, and lo verify that the recommendations have been appropriatel.v interpreted- Significant design changes may require additional analysis or modificarions lo rhe recommendarions presented herein. We recommend on-site obsen'ation of excavations and tbundation bearing strata and lesting ofstructural fill by a represenlative ofthe geotechnical engineer. RespectfuIly Submined. HEPWORTH - PAWLAK GEOTEC}INICAL. INC. JVA, Inc- - Ann: Bob Hunnes Louis E. Eller Reviewed by: Steven L. Pawlak- LEE/vad ie$h#fD 15222 .:/J"rj!14"7P.i Job No. 106 0938 c&Btecr' I recrlro, II IS7 I n FILL; silty clayey sand and gravel, scattered cobbles, firm, slighlly moisl to moist, mixed browns, some lopsoil I l J ano organrcs. I, F:Zl I Kf; GRAVEL (GM-GC); silty, clayey, sandy, with cobbles and possible boulders, medium dense, slightty moisl, brown. I vL:J II f--r=l I Ffi_ql SANDSTONE BEDBOCK; wealhered and hard to very hard with depth, slightly moist, reddish brown. I EiiEd IIL | | I Rehtively undisturbed drive sample; 2-inch t.D. California liner sample.ll- Ilr I I Drive sample; standard penetration test (SPT), .l 3/B inch l.D. split spoon sample, ASTM-1586. I 1A11. Drive sample blow count; indicates that 16 blows ota140 pound hammer falling 30 inches weretot tz required to drive the California or SPT samoler 12 inches. T Practical drilling refusal. Where shown above the bottom of the log indicates multiple altempts were made lo I advance the boring. NOTES: 1. The exploratory boring was drilled on December 15, 20O6 with a 4-inch diameter conlinuous flight power auger. 2. The exploratory boring location was measured approximately by pacing from features shown on the site plan provided. 3. The exploratory boring elevalion was obtained by interpolation between contours shown on lhe site plan provided. 4. The exploratory boring location and elevation should be considered accurate only lo the degree implied by the method used. ] 5. The lines between materials shown on the exploratory boring log represent the approximate boundaries between I material types and transitions may be gradual. ] 6. No free waler was encountered in the boring at the time ot drilling. Fluctuation in water level may occur with time. I 7. Laboratory Testing Results: I WC = Water Content (7d I+4 : Percent retained on the No. 4 sieve I-200 = Percent passing No. 200 sieve I LL = Liquid Limit (%) | Pl - Plasticity Index (7") | 106 0938 estecfr HEPwoFar}}PAwt_Ax GEqrEcHNtc^L LEGEND AND NOTES Figure 3 APPROXIMATE SCALE 1" = 30' \..e \ .-' \\r I \\ \ LOT29 r\ \l \\ EX'TNG \ . \ txrSilNG \\ \ RESIDENCE. \ F{ts5IUtsNUE \\ \ BO5 POTATO. \ dUC TUIAIU \\, \PATCH DRrvE \ \. ltt t" (t \\ \\ \\ \\1\ \ \ I t I \\ )\ \ \ 8570 \l I I \- - -T-- I \ 106 0938 ceeecrr HEPSIa|ETI+PAIULA.K GEC''ECHNICAL LOCATION OF EXPLORATORY BORING Figure 1 BORING 1 ELEV.: 8609.5' 12!12 WC=8.0 '2OO:25 LL:24 Pl:7 82/12 WC=6.6 + 4:2 -2OO= 2a 50/3 (t) (D tL -c o-(I)o NOTE: Explanation of symbols is shown on Figure 3. LOG OF EXPLORATORY BORING106 0938 dt -'6 @ 9xg2d co o\o \o dz ,o ri Iz!fi(/)5pL_ =ifLJF Hbxtl-r v(, .kv-d{u+o =&aiF;+oEioF=lU -1 I (J'' 24tHB. 7 HB T|ME RFADTNGS I 0 45 MlN. 15 MtN. 6oMtNj9MtN.4 MtN 1 MtN #2m U.S. STANDAHD SERIES #5O 'f30 #16 CTEAR SOUARE OPENINGS 3lg 314' 11/? 3', 5',6'9" roo o LrJzaF E Fz arJo lrl(L oz.6U' .L Fz. UJoE. UJ(L .005 009 .0i9 037 O74 150 3gt1 .600 1 18 OIAMFTFR OF PABTICLES IN MIIIIMETERS 2.36 9.5 12.5 J/ 5 't52 127 GRAVEL 7"SAND SILT AND CLAY 24 LIOUID LIMIT % SAMPLE OF: Weathered Sandstone PLASTICITY INDEX O/O FROM:Boring 1 al 15 Feet 106 0938 effiecfrHEPwoBTI+PawLax GEoTEG|.|NT^L GBADATION TEST RESULTS Figure 4 FILE NODE P. 1 * * x Cot4MLJl'lICATIof{ RESIJLT REPoRT ( nFR. Z.A@7 4.67Pn ) x * * TTI SNOI^IDOI.tsJ{OPKINS OPTION ADDRESS (GROUP) RESULT PFGE 51: r,rEt1oR, TX t'B3Z7SWAB P. B/B REASON FOR EFROR E_1 ) HANG UP OR LII.IE FRILE-3) NO ANSI^IER E-2) BUSYE-4) NO FRCSINILE CONNECTIO{"I PO Box 3340 o Vatl. Colorodo 81658 r Phone:970.476-2201 . Fax: 970.476"7491 Facsimile T Date: To: From: /aarw ?a= 4,11_ X_Lo_b_ RE: Number of pages, irrcludirrg this transmittal sheet: fu ! b: @tt*.pwr FILE I'IODE P. 1 * e( x coMt4uNIcATIoN RESULT REPORT ( nffi.. ?.?W7 4|A4Wl ' x * * TTI SNOI{DOf{8JSPKINS OPTION ADDRESS (GROUP) RESI.JLT PAGE 51e HEI'0R, TX LWngA%iA P. 9/9 REASO}{ F'OR ERRORE-1) FFNG UP OR LINE FAILE-3) FN ANSI^IER E-Z) BI,JsYE-4) NO FACSIT4ILE COI.XWCTION PO Box 3340 r Vall. Co / laufpr-tup_313" AIA_b Number of pages, including this transminalsheeu -fr thWmu*rum)W &tt+,pffi1- Facsimile Transmittal Dare: .n.ln l,A-1- TO: FROM: DATE: SU&IECT: Plannlng and Environmental Counission Conmunity DeveloPment Department July 23, 1990 A reguest for a variance fron the wall height .ieatii"t"nt on t-oi zg, Block r, vail Potato Patcht 8o5 Potato Patch Drive.Appllcants: Patsy and Pedro Cerisola I.DESCRTPTION OF THE VARIANCE REOUESTED The appticants are the ownera of Lot 29, Block 1' VaLI Potato Patch (805 Poiato Patch Drlve)-and.are requesting 1 variance from a ."iit- arlowabre wail helght to-provide for it"-""""tro.tiorr-"i-i ".r singte fanity hone- oT the lot. The variarr"" t"q.r"steA-woufa ittow for-wall heights ranging ii"t i ieet, up to 10.5 feet in height' Section 18.58.020 (c) of the Town of Vail zoning code allows for a maxinurn *.ir'r,!igtt ot 3 feet within the front setback ii"., and up t" i-reei-ott aty other area of the property' itii'sectio-n of the code reads as follows: rrFences, hedges, walls, and landscaplng screens' where not restrf.lEa-iv covenant or other leg3l instrument' shatt not eiceea'tnte" feet in heigfl! within any required front setback area and stritt not exceed six feet in freighi on .tty other portion of-a site' -provided[tii [ign"='i.r,""t, fredges-, i^'atrs, or landscaping screens ,"v l"--i"ifioriz6a by the zoning adroinistrator where necessary to screen public utility eguipment' No barbed *ir"-oi'eieclrtcaLl-y charged fence shall be erected or maintained' It 134 feet of the proposed retaining wall nould be within the front setback arEi ina 51 feet wo'ita be out of the front setback area. Aii ;- the wall is on the appl.icantrs property. The average sloPe of this lot beneath the proposed residence ;; e;i;;iay is'appioiinaterv.50 Dercent' rn order to access the site,-ifi; appticairts aie proposlng a driveway with a rnaxinun grade of 8 Percenc' II. ZONING CONSIDERATIONS A. This lot ls located within the Residentlal zone distrlct. B. The adJacent land uses are as 1. North - Potato Patch Road zoned Prinary/secondary. A. Consideration of Factors: Primary/Secondary follows: and Ipts 5 t 6, both 2. South - Tract A, zone Agricultural & open Space' 3. Eaat - Tract A, zoned Agricultural & open space' 4. t{est - Lot 30, zoned Prfunary/Secondary' III. CRITERIA AND FINDINGS Upon review of Criteria and Findings, Section 18'62'06o of the vail u""i"ipif-c-ae, the Depaffinent of connunlty- Developnent rec-onmends ipproval- of the requested varLance based uPon the following factors: 1. The requested variance, if approved, would-not "li""i"div affect lrte uie or Lniolment of adJacent ;;;;;;r;t-i"a wourd not block- oi inpede vl-ews from any surrounding properties' The westernmost i"iii"ii,g wirr wour6 be irnosr ent.!rely screened ;;;-trd by the sitlng of .the residence (eee iliictrea sii,e pran1. Fortiory o{ the eastern i"i.i"i"s rrarr-wouiit le viEible from properties i;;;Ge Selow this lot. Ilolilever, the applicants ii*r" oroposed to heavily landscape the area iii!ai-.tEiv-u"i"* "t a r-n front oi the retaining ;;ii:--fi"'"ppir""ntrs are proposing to lre.ak up- irrE-r""t ot lle wall with the planting of three 8- foot Engl"ten tpr..ce, one g-foot.Blue sprucer and, il;;" 5:inJrr caiiper aspen inrnediatery J'n front of the wall. All retainJ-ng walls wlll be flnlshed with a atone """".i-iicin6, and thls treatnent wlll natch the ;r;1i;"-iili;h on ttt" exterior of the residence' ilia;"-u"rt"*t. will provide a unified apPearance on the lot. 2. The topographic condltlons on thig lot are such trrit tit.-uuita.ute area of the slte Ls very-well defined. Because the average slope on the lot anrproximates 50t, access onto thls Elte is ;Iiffi;il-aitriiitrt. rrt" appricants are proposins ;-d;i;;ey wrtrr an average giade of 8 percent' wntcn the-staff considerl a reasonable grade to-- access the property. The pro-posed retainlng- walls ii"-"E"t""a-ry io sirpport g-iades both above the driveway and below the drivewaY' The PLannlng staff believes that the proposed retaining will.s are necessary to ensure riiufrf"itl.on of ihe slopes and Potato Patch Road' ina we feel that the pro-posa1 is reasonable and c-it"infy necessary on this steep sl-te' The applicants have re-searched using a 3r tiered wall' i-"-;;e;; to avoid reguesting a variance, however' tii"-iorrt analysis aid bearing pressures fron pot"to Patch R6ad would structurally not allow for such a design. 3. The staff finds that have no slgnificant consLderations. the reguested variance will J.npact uPon anY of the above IV. FINDINGS A. The Plannincr and EnviEorunental. gomnissioT shall nake the t"t'tti"a " tttti""="t That the granting of the variance will not constitute a iilit-'Ji Ep"liiii-privilese iT"?':l'tent with the itritationi on ot-ner proferties classLfied ln the sane district. B. That the granting of th9 variance will not be detrinentar -lo-tf,e publlc health, safety or velfare' ;;;;;r;iii-tj"iio"i to propertiis or inprovenents i the vicinitY. c.That the variance is warranted for one or more of the followl.ng reaE ons: L. llhe strLct literal interpretatl'on or enforcement "i tfte specified regulat-lon would result ln practicai dlfficultf or unnecessary physical fi;;d;hi;-incon"itteirt wtttr the objectives of this title. 2. There are exceptlons or extraordlnary circunstances -or condltlons appllcable to the same site of the varlance that do not apply generally to other propertles in the same zone' 3. The strLct lnterpretation or enforcernent of the "p""fiiea r-guf"ifon sould deprive the appllcant o-f privtlegei enjoyed by-the owners of other prolerties-in the sane district' STAFF RECOMUENDATION The staff recommendation is for approval of the varLance recruest for a uaximum wal'I height of 1o'5 feetr -per the ;;;i;;=-""utitt"a by snowdon in!-Hopkins, Architects, sheet a:i,-ait"d Juty 13, i990. lte believe the reguest would not te-i tiant of -special privilegg and that the variance would not 16 detrirnental to ine pullic health, safety or welfare. The topographic conditions of this site have created some ;;"y-fiift"-a".t"i"p."ti .ot=iderations, and the Planning sta?t bel-ieves tnai a hardship would be I'mposed-upon the ;;;ii";t-ir irt" strict and l-iterar lnterpretatlon of the zb-ning code were [o-f" enforced. The str-ict interpretati-on ;i affi r.if n"igni tirnits would, rnake it virtually inpossible- i" i""ei" ttre site. Flndings supporting the variance are rv A, B, C2. The Design Review Board has reviewed this request, at- their Jun"-e, iggo neetLng, and by a unaninous vote of 3-0 has concepfually approv6i tfre proposal with the condLtl-on that if a iarianire iioro ttre rnaxinui wall height fs required, that be obtained fron lhe PEC. The soils analysLs, which were needed to deternine the exact wall heights, were not l.ratfiufe at the tine of the DRB review' v. H5 = f ht. ir ,[ N\\ \ ,$ \ t T:,).t.N'. \ t {E F $ ,, 1 I JI el # .! o =zo ol o1,..o\.,,. o\. F\-l= \l<\O k \O rOolo o,\ '.\l6l 0oloolll. I Io'5rFllE'X :l<OE.:tadz d= ='=le I I htrld,()l .5;i (lt ro ItE5'oEtotzt6 tJ ah UJ IIJ lJ- F = IJ.J *rN E o) TII6 .9 ct (! =o F : Y o 6 E(/fr3't ESE rr- E f,,,eJ'\ll.9- U.eAfi[ JlS-' !€91-Ict o-cL<(5-t ;2..9{ Ai rt)i.J \J tItlz =o lU1- F z rLJ uJo =I ll" UJE F z = .9 at>q)It g; q)o '.4 .:E.o o E 6 o) F,thzzF,6E o) E ooo(5 o at .2E =l0 u;3(! o (g o E 6 ato (! .go o 3oF o E] a q cI o CL 1' (! .F (! E ; --3>o. Eo o Eq)(! E:o- ]E E8 -Oo_ qg F'3;o;c) '-o rD(o€o(D =E;>cP d.E E(!@c ctrio':EY .=- O(! dE Eo H(,OE O'G ctc-c(!-a60 og 9) (!E:E3o(0 -v= OE >,9 -OO9E =e\r, E.f- o -o \oo\o C.l @ ..t) LIJull! = =E u,,,o J F FNO|].Vn'lVA (, (., ru€.r{q olr FI (! t+{ 0, o( tr.r{ th -G =Zu- 6z = llJo J e. UJzgJ >g -l(rt =COGI zz Fo_ 4:< -.!:.lX=lL=anoz>.6Zu-<oo- cv>x -.(\i u,lf IJJz =F F zo tr Jfaz O-i I Fz z <oo< =F8c;<z I e.{I c'l tlll trz, \Jz -Fdo3dOI cttlE zo =oo z tr uJFJ X =auz =.1ol uJl 5l <l>l ttlol fl r,o oo o ru z =tr I I I I I c,l =.1ol IJJI 5l al>l rLlol =l sOl uJFI F olull cEl *|ol zl pl +.to q, a, z g t! I I s-lol zl 3l FI +Jo c,o a o z =etr I c{!n I C!,rn I () I'i.l{ t- I .lol -l olt{ldlI Iu4E 4 oo Eott.Fl oo Fl at)..{ H 0, C) uJ =z d) -) o+,o Ar o TJdrlql F.t FI 'Fl(s z tl- co XI Nl Fo l'{loINrllNol Iol\olrlF-rlofllr _el"l-loolc)e{lt: Ul .AUI;E;ojl> ao d) J4 o tro Bo rJ) =e. lr- I flF-l ''-{ | "-{ | .lolzl ctl uJl 5l ?l>l u-lol zl FI o ru +, .rl o IDtt q }. Uo =e. E 9P =(J;sfFd8 z T (J uJ = E i\ =+(lOz <F uJ<zE[!F(1 Z F EFz FO uJtr T C) ciz L =t I.IJL F oz tl- z6 = J(L tr crllt tto:HE:E{clf60E .t)e9'o ir Ed =>FJF =uli-E b=o q.- E: :o- E 65lP 't urE X, O-f; -;;iB'ioitr- tJl co F -f - EE! ..i3\J \.' = ==3'-;\ -l- = uJ -*'i6il=ggs *l1\l-- Lc) -$.if O-E/" UU 3 ocn o\a\o UJ F o ltj tr U)oo-zo Fo- uJY uJ d) oFt lrJ o- tr oo I utFoz E =E lrJ o-zIF()fEFazo() u,lo J E o of 9q anzo(J z Ftt G i i;.b.: j Q t . = E=:r ii E i*::3T.?i.!-2..a "+ i = ;.2 2 ii;- z q..z :.: : =;c!i,!L..: - 9= c if i i r 6iE:--;= E E; i;:niizi:E t - -.= t ! i =+ !EEIE5+ --. ?: 7 o- .= : i 3 5 :E:: E:; " 1J - | 7.: ,,j i : f ; 3i xo +Jc^ d o\o\ co Hr'l rqE ts tI] U) 2 A ts H v F1 o.rN FIoFf c)H rn 6 U) frl Fl z3 !oe ao U F F-rn.it.n cfl Ifi F1 FnEl u) rlr& U f frl z l-{ U) Ft v,H frl E z al F-ulHorD<>x >zza<< a:.-t rl < !./."ri A -z"v-z= *,alFS=q--Pa\ kJ t/- a< ,^ FTZZUAq.l \ -': -<ts=Fa ca5eoor z3FF*rrJ<H9ir\<iiF<V C;c<lezF!L>Z^=*<:: EsHOPFTA{ ,.'' I! ilto>-;!4Oa>i\zr-rYv ^Hf:F Itrro(l FZU:ffir<EUSXH -F-Yl E53F it -rH AIa.,tf *fLatt A.F ENts -rtsat{ aiF!aF?F -afP trtF il-l +|Fr\ EY r+ -:€ -E|e 5)LIts+ad *F(FL.Hfh\{:7 i{r trl A.rl{al-l.FrFlrlJttrlhA.o .run?tsiir'r{iu rir6i ''" "US ffiSmlflES FAI ilo, 303U4335 P,01 nm0 go lthon It, t{r} csnce$u ; I., Fodro Gcrltola, eeet,lty thet I ua ava-r of thr.fsct thaB t,ot el, vall FstEto Fatdbl vallr obloraeo llas ln r gacloElcat : mnattive itGil I rn{ tnrlhlr a<ilstctrte4gr tlra! I au rwara of tbr last thrt thc r a!, DRo9orlng. to bulld, on lpt 39 elao rlltr ogtlcel taffiltfin !i!\Dtrthlll : r' I It&ge8l,b€{ aDrf rflorn brfon ne tbl't --?gfL- dey c! -Ilue.*-, 1990, ',2 1990 4e&a,.+ ?egaz, xotsry i I Project Application o^t" 5'30:70, Project Name: Proiect Description: Contact Person and Phone Owner, Address and Phone:7o / , CDrr->(', Architect, Address and Phone: Legal Description,tot 27 , ancx ,r,^n l/i/ f,&2, /o"4/. , z,^" P/b Comments: Design Review Board Date 6.6,70 Motion by: Seconded by: j-o DISAPPROVAL Su mmary: Town Planner Dale: E staft Approval $liifuBlock / Filing Pa{+{" /hk|"' ADORESS: 0'..lNER ARCH I TECT ZONE DISTRICT PROPOSED USE I NT qTTF Hei 9ht Total GRFA PrimarY GRFA SecondarY GRFA Setbacks: Front Sides Rear l,{ater Course Site Coverage LandscaPi ng Fence/ Retai ni ng Park'ing Credi ts: Garage Mechani cal Ai rl ock Storage Solar Heat Drive: SloPe Permitted Envi ronmental /Hazards : ZOiIE CHECK FOR SFR, R, R P/S ZOIIE DISTRICTS one Phone A'l 'lotved s(33) 15% + 21e5.t t8s1.2 20' l5' W!- 6' a".l il i eer';t{ (3oo ) (6oo ) (eoo)(1200) (so)(1oo) ,a.i/,-i.r\[4]/\lu/ (2oo ) (4oo ) Prooosed 3j' raex. OK grD {30? \ I -frpL \>'N/a ( .\ /) / u/e zatt OK 0"? '19'v'1"/ (30)(so) istS 'rla I I sf Hei ghts frr- lzs\ ->r- (zoo\----t-=r- K 7" - S'loPe Actual Aval anche Flood Plain Slo}e E,tr..Js aO ?a ,\_ l.letlands Oll Geologic Hazards Comnents: Zoni ng: Approved/Di saPProved Date: )EatT 5lqnaEure / DATE I ni \r rLl,U,ru t -"" ZONE OISTRi PROPOSED USE LOT SI;E Hei ght Totai GRFA PrimarY GRFA SecondarY GRFA Setbacks: Front Sides Rear lilater Course Site Coverage Landscaoi ng Fence/Retai ni ng'Jal'l Parki ng Credi ts: Garage Mechani cal Ai rl ock Storage Solar Heat He i ghts lfetl ands Geologic zoi.lE cHicK FOR SFR, R, R P/S ZO|IE OiSTRICTS Bl ock tri1inn l/W| | | rrrY l/ | ! A'l 'lovred (30)(33) AOORESS: 0",lNtR ARCH I TECT Pro Do s ed JJ llt 't t,- t ,M t4 -!...!E 47a !t/ 'i ?aqr-d 20' l5' 1ql (30)(3c) -T4rf7nlN4 (3oo)(5oo) (soo)(r2oo) (so)(roo) (2s ) (50 ) (2oo)(4oo) 4oq 4o /15 /w0 Drive: slope Penn'i *ea L07a slope Actua t - 1'5/a Envi ronmenta I /Hazards :Aval anche Flood P'lain Sl ope Hazards Corments: Zoni ng: Approved/Dl sapProved Date: )Eatt 5lgnature 7 -.-'/.-7 pfulqo NN'IE OF PRq'ECTS LEGAI,, DESCRIPTION: STRSET ADDRESS: DESCRIPTION OF PROJECTI SUBDIVISION I LIST OF I,TATERIAI,S The follor.rlno Review Board A. BUILDING lnformation '1s before a flnal IATERIALS: requlred approval TYPE OF for subnlttal can be glven: I'IATERIAL to the Deelgn ouantltv S{,ze*ft A?ALl'f _La+t,+-/.W_zry b'_TT. Roof Sidlng Other l{aII l{atertals Fascla Sofflts Wlndows Window Trln Doora Door Srin Hand or Deck Ralls FIueg Flashlnge Chlnneys lragh Enclosures Greenhouses Qther B. IANDSCAPING: Nane of De PI"A}IT I{ATERIAI,S: PROPOSED TREES EXISTING TREES TO BE REMOVED MTrl 7 22q,, * f nd lcate for deciduous trees. s igner: Phone: trees. cal lper I nd i cate sNowDoN & HoPKrNs o*lrr.r, 201 Gore Creek Drive vArL, coLoRADO 81657 LETTil @F TRANSMITTAL "*' 1/-J0N/t l4?0 l'"" ""' ' A''ENTION FE Mpt4ilA 44wrt(303) 476-220r l,U[k uot,' ,t(t fNU ry > wE ARE SENDING vou ! Attachsd tr Under separate cover via the following items: ,/! Shop drawings F Prints D Plans E Samples tr SPecitications ! Copy of letter I Change order tr coPrEs DATE NO.DESCRIPTION 4 /z//tl4o /,6/ * Uf/ffi*ln I hb/ao €v(//46D 4#r Ll ,11 -A4 I /t'//o l4o #r///aL/>/-,/ ,A/ ,40,727 THESE ARE TRANSMITTED as checked below: E For approval\/R For your use I D Approved as submitted tr Resubmit-copies for approval C Approved as noted D Submit -copies for distribution E Returned for corrections E Retu rn - corrected prints 19- D PRINTS RETURNED AFTER LOAN TO US E For review and comment tr tr FOR BIDS DUE REMARKS COPY TO SIGNED: PnoqJcr?.sz /mt |r., c|rej, ra. owl t, .nclorut.r... tot rr noa.d, kLrdly Dotity o. .t onca. Nlcholas Lamplrls, Ph,D. coNSULTtNC OEOLOO|ST 0793 VALLEY ROAD CARBONDAL€, @LORADO 81023 (s3lec3.itto& ]rotJit] l,li]y :.i;(.r t l..l''ltli Fedr- Uer-i snI;rc,/t: Sin*r.iCnn [r I i::l:i 1.,::i. rrrr,, /1r-i::.fr:i. {.;.*r:i:: it; iilt):L {icrre fir-nnl: i.Jr- r vr.:.Vail,, E{"-r ,, Pt&,;r;r FlHn l.,.ctt 1i1$r fiin{:!r i.,. \tai,.!. lintat:*m [::'atr::lh Il) tit +:l t." lvlr" . {,lrilr*:i r; t:r ll. n I l. fi .,r ',' lr rJ ctr r: :i. d e d rrr { 1; r:r r- r'1 ii,i \,/ F ]irr". Isl is ci t:: haz.-:rv"rl* arct typi r::"-r ll. 1v /\ {:. tlrr+ to!: $.f {:. }-r ft e.l {:i)F-r rea(:h. l lrn l{tt il; *t*;lsip that s j, f.e r+p*:r: i .f i i: s*i l. Fi d firlii :i. fl n i, :; ver y :i mt:r flr t en .L thm rveri"al. I de*inri" t h i,,; ilcii:ii"lr;j. f" r,.:r cirr [.,, '[:lr* top i:r'i E.h'* r'i:rc1,.:4.rI. J rcnr,.r l,lt i r:rr i-. rrr:i.rti fti.l "t .tfty,rcry, tr.tlier* .rr:lt i:: L irfr '!: fli i:rr..r:r .l r:i . r'i:rr !ls i:annot {:rr} ;ht:! s utl-r s:l,clr; c.{: t:hf3 pr pe}i-ty so i rrvclsti tlit L i. {::rl { lr- Drr:iper .f *urrdi:itiorr ,, {$i. t:r'l clrgt:i r-!,rG fi.l !:ilt$L.t1rl b r.:.. p.:rr.t of ll'l+rn thc.rr.rr.:th tlrc: '.;.r !: E' i.:r., i gii n f,..(:: !t$,li.tr," .; t r) :,,i !: lrei. i s:r.o i. t {i)Vrfrll" I r:l .n f ii} t" h + ri i r {:: r,lri l; :i. .:.r L {J(},,4n thn ::! l. r.}F} i: ,f l i r' I.r it r,l t- *i t..t iil ,:l t. i. tiit r:rr r,l. rJ llrit li,tr I,tr,.l"1 'i: tl:l' r' t:)t:, lr:fli, lt t::1 r. l't 1:1 t .::r *: ii r:r iiji$( r t. !r ,, {:rtr1:;! r fjl..lr." I i'r lt i: i:)ft ,,;1.: r" i.,r {-- t :i. n rI ,.::l :i. {ril titlfif '-r ,.ritiil t.::ilLt1Ii:ld f) l. *it,i,t.|ii6l c r..!l.' l:.'irr-: L rr, r,: i. { l: c:' nr ri, rr i. t-l t- i:r I tllerr"e /ni I Er |, {nf'(ir 1..i:i ni: eurr".I 'y ofl,Ua-,r,d N:i c:hn.[ a+:ii [."amD i. r- i. ::: mn+ilrl f-i rrg SenI oi: j. s;l: TO sNowDoN & HoPKrNs otl,rr.r, 201 Gore Creek Drive VAIL, COLORADO 81657 , LETTT @F TRANSNNI]TTAL ! Plans tr Samples E Specifications > WE ARE SENDING YOU j{ Attached E Under separate cover via tr Shop drawings R Copy of letter S. Prints E Change order tr coPtEs DATE NO.DESCRIPTION r/,P/f /'h)J ilt fi"L,4//u'/ /'t4a ,fuiltht lizl/ > it r / >i/q,/t,h.!a/ ff,artn fAftr't4:4 ft7*l i.71zn hiht e THESE ARE TRANSMITTED as checked below: E For approval tr Approved as submitted \--{ For your use tr Approved as noted B As requested I Returned for corrections ! For review and comment ! FOR BIDS DUE Resubmit-copies for approval Submit -copies for distribution R€tu rn -corrected prints tr D D 19- tr PRINTS RETURNED AFTER LOAN TO US REMARKS COPY TO /SIGNED: Pioorcl2ao? /ffi7r|r, erb. ts olal.lt aacroaurtt ,ta aot ,a nota4 klndrl, notltt t a ,t onca. qe-Trr *e May 28, 1990 Town of Vail Building Department 75 South Frontage Road WestVail, Colorado 81657 U. S.A. Attention: Mr. Mike MolLica Dear Mike: In regard to the chain link safety fence you have given us approvaL to p1-ace across Lot 29, in VaiL Potato Patch, I would like to nake the following guarantees: A. The fence wiLl be painted dark green to blend in with the landscaPing. We will Ternove the fence as soon as our backfilL and final grading work is conplete. This shoul<l be conple- ted no later than July 5Lst' erely, O I HTER.DEPARTI.IENTAL REV I E}I PROJECT: DATE SUSI,IITTED: COI.'d4ENTS }IEEDED BY: BRIEF DESCRIPTION OF THE PROPOSAL: POLICE DEPARTI4ENT DATE OF PUELIC HEARING 5,3O,70 /1/e - K*5,'/o".g Jun u,d-+ 1n-{1,< r/;L)'e-n 1) Zu+. *'n*l o -pl^;l( ttL Revlewed by: Comnerrts: Date , I ',:.t, ..: ji RECPEATIOlI DTPARTI.IENT Revle'.red by: Comrents: ..! / Com:r,ents: Da te DRE IPPTJICAIIION DATE APPLTCATION RECEIVED: DATE OF DRB MEETING: *****THrs APPLTCATTON wrLIJ Nor BE ACCEPTED uNTrrJ ALr, rNFoRuATroNIS SUBMITTED*i*** I. PRE-APPLICATION MEETING: A pre-appl.ication neetlng with a planninE staff Deurber isstrongly. suggested to deternine if any additionallnfonration is needeid. Ns application wi]I be acceoted It Is the applicantrsresponsibitlty to nake an appointnent wLttr ttre staff, to f,indout about addlt,ional submitt,al requirenents. please notethat a COMPLETE application wiII streanline the approvalprocess for your proJect by decreaslng the nurnler- bfcondltlons of approvat thal the DRB miy stiputate. ALLconflltlons.of approval must be resolved before a buildingpernlt Is lssued. Application wlll not be processedwlthout Ownerts Slgnature. A. PROJECT DESCRIPTION: B.IOCAEION AddreEs OF PROPOSAL: Iegal Description Subdivlsion c.NN,IE OF APPLICANT: Maillng Address: Phone D. NN'TE OF APPLICANT'S I'taIIlng Address: NN'TE OF OWNERS: 8ICNATURE (8) I Condonlniun Approval if app1lcable. Phone 4- -ttn{ 4a F. G.DRB FEE: The.fbe will be paid at the tlne a buildinqperrnlt is paid for. EEE $ ro. ooI zs. oo $ 50. oo 9100. 00 $200. 00 s300. 00 VALUATION $ o- $ 10,001 -I 50,001 - $150r 001 - s500,001 -I over s 10, 000s 50, oooI 150,000$ 5oo, ooo 91, 000, 000 91, ooo, ooo Zonlng REPRESENTATIVE: I'taiLing Address: Phone (0vER) PI.AIIT IdATERIAI,S: PROPOSED SHRUBS EXISTTNG SHRUBS TO BE REI,TOVED *Indicate slze5 qallon. Botanical Name Comnon Nane OuantLtv Size* of proposed Ehrubs. ,lt'r'ttry (^!"'!'yg ^ l)trltfrr 4r _gan F €r ', 4p. l,t,t/.t^r 4opth 4p, /r, ' ,( f.?( /f _%L -L b+L GROUND COVERS soD SEED TYPE OF IRRIGATION TYPE OR UETHOD OF EROSION CONTROL c.orHER ra{DscApE FEATURE' (retainlng walrs, fences, swrmrnlngpools, etc. ) pl.ease. speciry. inai6ai"-;;is;;;';i retarninswall's. Maximun height-or witri wrtnin the front eetback rs i"tE"l;"aMaximun helshr or waits etsewneii on-lrr"' property BEt-K $HSSU trilr .3uJy4,ld55s ,.U0,90 12:27 No,uu-i ,.-_ uTf,LrqI LocArlQIi, vEgrFrcArroN FII,ING I The locatlon ot ut,llltleeT whether they be ualn tnrnk llnee orplgPgsgd rlnee, lust be approved.and vlrlfied by the forrowingutllttiea for the accourpairying site plan. Authollzed Slgr0ature sUBDIVISION ,tOB NN,IE :.rlr-- /4 Blpcx ADDRESS U,5. lfest Coununlcatione 1-800-9 2 2-198?tl68-6860 or 9{9-4530 Pttbltc Senrlge Cqnpanv949-57AL///,Cefq/Q' cary HaII //v Holy Cross Electric Assoc. 9{ 9-589 2 Ted Huslcy/Mlchael Laverty Herltage CablevlBlon T.v. 94 9 -553 9€r*y.JetrrsonS'r'au€ /va'rr Upper Eagla VaIIey water & 9anltatlon Dietrlct r tl?6-7480 Frrd Haelee NOTE S -f tr- qa contractor ofcutut penrlt frl{orke and tolt fron in any publicvatl. A. A Btreet obtalnlng Upper Eagle Valley \,-qil\\^*ftr.. These verlficatlons do not relleve thehie responsibility to obtain a Etreet,the Town of vaj, If Depargnent of publlc W.?efpfe sisqinqright-of-rday or easenent in-€he Tar{n-or cut permit Dust be obtained separiatlf ThiE fo::ur is to veri,fvIocatlon. This ehou}bpreparing your utilityinstallations. r Please brlng a glte plan whenWater I Santtatton elgnatures. eerr.flce availablllty andbe ueed in conJunctlon wlthplan and schadullng 7 LAND "I" April 24, 1990 Our Order: VL5137-3 BUYER/OWNERS LARCH, S.A., A SELL,ER: ADDRESS: CIOSER SLIFER, SMITTI AND FRAMPTON DRAWER 2820 BEAVER CREEK, CO 8L620 1 Attn: JAN iTOHNSON SLIFER, SMITH AND FRAMPTON DELTVER TN AVON RT'NS Attn; DON GAI.,,GAN E RANGE PROPERTIES VAII-, RUNSLI\TER IN GUARANTEE OMPAN Representing Tltle Insurance Company of Minnesota THANK YOU FOR YOI'R ORDER cffit%uk ?tqDuNu PANAI{ANIAN CORPONATION ANJA, INC., A COL,,ORADO CORPORATION Attn: SHARI{,AN 845-9400 Attn: JOHN SLEVIN LAND r11" cuARANTEE Oo"pANy Representing Title Insurance Company of Minnesota THANK YOU FOR YOUR ORDER GORE RANGE PROPERTIES DELIVER IN VAII, RUNS 1 Attn: JANICE CIAITPA-BAUER COPIES 1 Attn: rRED OTTO DELIVER IN AVON RUNS 1 Attn: PICKED UP FOR DEIJIVERY Al,I PI,I roR TITIJE QUESTIONS CALL KARSN HORTH 3O3 476-225L FOR CL,oSING QUESTIONS CALL SHARIiIAN K. GREEN 3O3 476-22sL Gommitment To Insure lssued through the 0ffie of: 5440 Ward Road Suite 200 Arvada, CO 80002 420-0241 3300 So Parker Rd., Suite 105 Aurora, €O 80014 75 t -4336 2425 Canyon Blvd. Suile 230 Boulder, CO 80302 444-4101 200 North Ridge P.O. Box 2880 Breckenridge, CO 80424 453-2255 5 I 2 Wilcox Casile Rock, CO 80104 688-6363 102 South Teion Suile 100 Coloqado Springs, CO 80903 634-4821 MINNESOTA TITLE A '108 Soulh Fronrage Road W. P.O. Box 357 Vail, CO 8l 657 476-2251 710 Kipling Streef Suite 202 Lakewood, CO 8021 5 2 32-3 | I I 3609 So. Wadsworth Suire I l5 Lakewood, CO 80235 988-8550 19590 East Main Street Suile 105 Parker, CO 8O134 84r-4900 P.O. Box 5440 Denver, CO 80217 32r-t880 8821 E. Hampden JU ITE I UU Denver, CO 80231 7 50-4223 910 | Harla n Suiie 100 Westminsler, CO 80030 427-93s3 | 201 Main Avenue Durango, CO 8l 301 247-5860 7700 E. Arapahoe Rd. JU ITE I5U Englewood, CO 801l2 770-9596 3600 So. Yosemile Suiie 255 Denver, CO 80237 694-2837 108 Soulh Fronlage Road W. P.O. Box 352 Vail, CO 81658 476-2251 7700 E. Arapahoe Road Suite 150 Englewood, CO 80112 770-9596 COfUPANY ,rt*r;ftry a z89Z r,urot t/Ita fuoEuAtS pozuoqtnv VL0SlNNll l l0 ANVd1,I0C lSNVUnSNl lllll fuoleubrs pazuoqlne laqlo lo Jactgo 0uneprqen e lq paubrsralunoc uaqm prleA aq ol'V alnpaqcs ur umoqs alep aql uo s.lacrjJo pazuoqlnE Alnp s1 Aq pax4;e olunaraq aq ol leas pue aueu alerodroc slr pasnec seq elosauury\l ;o Aueduo3 acuernsul ap-1 tglUlHM SSlNl.lM Nl'luaulrururo3 srql Aq palalor uoaraql a6e6your ro lsaralur Jo alelsa aql anlen rol prooat Io sarrnbce parnsur pasodord aql olep aql olroud 1nq loe:aq alep anrlca$a aq1 olluanbasqns 0urqce11e:o sp:orar cr;qnd eql ur 6uueadde ]sJU'paleaio 'Aup I'sraueu.laq]0 ro suirelc asra^pe'sacueJquJncua'suarl 'slcalao g 'spocar crlqnd aql Aq unnoqs lou pue Mel Aq pasodtur 'paqsruJnJ raUsaJaq Jo aJololaraq] leualeu r0 roqel 'saJrAJas.,ro, 'uarl e o11qbr.r.ro 'uar1 Auy tr'splocar crlqnd aq1 Aq umoqs 1ou are qcrqM pue asolesrp plnorn sasrua:d aql ro uorlcodsur pue Aaruns lcaroc e qctqM s1cel Aue pue'sluaurqcporoua'eare ur aEeyoqs'saur; fuepunoq ur slcrljuoo'sercueda:csrg g 'sprocar crlqnd aql Aq umoqs lou 'sluauasea lo surslc ro 'sluauasel 'Z 'sprocar cr;qnd aqt Aq umoqs 1ou uorssassod ut satyed 1o surelc ro srq6lu 1 6uttvto;101 aql ol lcolqns osle sr luau1urrttoC slqt'ol parrolar a^oqe a0erano3 urorl suorsnlcxl pue suorle;ndr1g pue suorupuo3 aql ur paureluoc sraueui aql ol uourpps ul SNOIId]3X] OUVONV]S luaurlruJuroC srqt lo suotstlold aql ol Falqns ate pue uo poseq aq ]snur luaulrurr.!03 srq1,{q pararor uoaraq a8ebuou aql }o snpls aql ro }saralur rc ale}sa ag ot al}tl aq} }0 snl4s ag jo uo Dursue Aueduro3 oql ]surp0e 0uuq Aeu ro a,req leu parnsul pasodod aq1 1eq uope io s1q0u ro suorpe ro uorpe Auy y 'urataq pa4rpor.l Alssatdxa se ]dacxa luaultuttttoJ srql ]o led e apeur pue aiuaralat Aq paletodorut &aiaq are qcrq A parnsu; pasodord e\g 10 Jolel ut Jol poututuoc sarcr;od ro l(crlod 1o tuol aqt 1o a0era^o3 uo4 suorsnlcxa aql pue suo[elnd[S pue suorlrpum aq1 pue suorsraord Euunsur atp ol palqns s! AUI!qe!l qcns pue 1gl pauulrxoo satorlod lo futlod aql r0] V alnpaws ur patpls }unouJe aql paasxa Alrlqerl qrns lleqs tua^a ou ul luaurlruuro3 srr4 r{q pata^oc uoarar4 a0e6your ro lsatalur ro a1e}saaq}a}eal3]oa.]lnb3eol(3)lo,8a|npaq3Sutuivtoqssuot1dacxaateu|uJ||aol|q)Jo}oalaqstuauJal|nbalarpq1rairA1duocot(e)\q|elpoo0Ul0rirl;e1apn ur uoaraq acuerlar ur paJnrur ssol ;enpe ro; r(|uo pue Jo] pauururos satcrlod ro rirrlod p uro] aql ut pajnsul lo uo!l!ullap aql lopun pepnlcur saryed qcns pue pa.rnsul pasodord paueu aqt ot r(luo aq lleqs luaurtruruJo3 srql rapun r(ueduiq aq1 lo {rpqerl g 'suor1elndr19 pue suotltpuo3 asoql p t qdel0eted ol luensind palnrur i\1snotrrald,!t1tqet1uLol1i\ueduiu3aq}a^a||a]loUl|eqstu3tllpuaueqcns1nq,r(10U|pJoc3e}UaUl|Uul{s|q}]08a1npaqc5puarr,reAetuol1fs1l1eAueduq aq] laueu a$o r0 urels asra^pe 'acuerquncua 'uarl 'palap qJns Aue p a6payvroul ;enpe sarrnbce asrrrrer4o Auedual eq1lr to i\ueduq aq o1 a0papraoul qJns asol3srp lleqs parnsul pasodord aq 11 aopawroul qrns asopsrp os ol parnsu; pasodord aq 1o arnlel Aq pacrpnlatd sr Aueduro3 ag luaua aq ol uoalaq a3Ue|laJlope^ueulo{0u|{nsala6eUepJosso|Auelo1,(lt1lqet;ulolJpo^at|aJaq11eqslueduqaql,0u|l|J/t^u|lueduo3at4ola0pe1oulq0nsoso|0slpol lre] lleqs pue Joaraq B alnpaqcs ur u/v\or.ls aso$ ueql raq]o luauJlrururo3 stql lq paranoo uoaraq a0e6yor.u ro lsalalut lo aleFo aq ourpage regeu taqlo ro ulelc asra pe 'aJuerqurncua 'uarl 'l3aFp Aue lo a6palmou1 ;en1ce sarrnhe ro seq poinsul pasodord aq 11 7'luaunrpur Alunoas raq]o ro 'peap ]sru] 'lsru] ]0 paap apnlJUr lleqs 'uraraq pasn uaqm ',,abeby0r!,, u.xal aqf I SNOIIfl Nd[S ONV SNOI]IONOS Aue0u03 aql l0 llnel aq ]0u sr sarsrlod r0 rirlod qcns anssr ol alnlrel aq] ]eq] papr^oJd'srnmo ]srl rolaqorq A'anssr lleqs r0l paprullrol sarcrlod l0 &rlod aql uaqM r0 ]oaraq alep a rp€lla aq] JaUe sqluour xrs aleurulla] pue asea3 lleqs rapunaaq suo4eor;qo pup li11lnql llp pue muelnsur al1l Jo sorcrtod ro ^olod qcns Jo eJuenssr eq1 o1 fueururtatd st Uou4tuuloC strll luauasiopua luanbasqns iq J0 luaulrr.uuJo3 stql }0 acuensst aq} p aurl aq] ]e iaqua ^ueduo3 aql & loaiaq V alnpaqcs ur pauasur uaaq a eq rol paururlloc sarcrlod to ,(r|lod aul l0 lunoue aql pue palnsul pasodod aqt 1o Atrtuapt aql uaq/\^ Auo a^ttJa$a aq lleqs luaurllrlruro3 slql losisq suolelndrls pue suorlrpuo3 aql ot pue B pue V salnpaqos ]o suorsnotd aq ol patqns 11e :topreql safueqc pue sllnrua.rd aql Jo luauled uodn 'V alnpaqcs ur ol pallaF] to paquJsap puel aql ur Aqataq patairog ]salalul lo alelsa aql ]o aa6e0uour ro raurno se 'V alnpaqrs ut pauleu patnsul pasodotd eql;o to,rel ut 'V alnpaqJs ur parlrluapr se 'aouelnsut aprl ;o sarcrlod to ,(rrlod slr anssr o1 slruuo Aqaraq 'uoUejaptsuol alqenleA e r0+ ^ueduro3 a$ pallm uraraq 'uorlerodioc elosauuly\ e 'VIoSlNNly! l0 ANVdI/!0C IJNVUnSNI lllll ^au 016 L -luau4lxrxo3 vI]v +--.. '1 ,rrY; ." ;\ ../ .,'t.i 'l Vi'*, oJnsul ol luourllluutoS VTOSsNNIW Ar,rO"o!,rurrMENr SCHEDULE A - Charges -ALTA Olsner Policy Tax Certif. --TOTAL-- I{ith your remittance please Application No. V151-37-3 For Information OnIyI'T 29 VAIL POTATO PATCH $4e9. O0 $2 o. oo $s19. Oo refer to Vl-5L37-3. 1. 2. Effective Date: Aprll 16, 1990 at 8:oo A.M. Policy to be issued, and propoEed Insured.: frALTArr Ownerrs policy i2so,Ooo.ooForn 8-1970 (Anended 1O-17-ZO) The estate or interest in the Land described or referred to inthis Connltrnent and covered hereln is: A Fee Sinple Title to the estate or interest covered. herein is at theeffective date hereof vested in: ANJA, rNC., A COLORADO CORPORATION The land referred to in this conmitment is described asfollows: COI'NTY oF E,AGLE, STATE OF ORDING TO TI{E RECORDED COIORADO. 3. 4. 5. Proposed Insured: PAGE ALr^l"oMMrrMENr SCHEDULE B-]. (Requirenents)Application No.vt_51-37-3 The following are the requirements to be complied with: 1. Payment to or for the account of the grantors or mortgagors ofthe full consideration for the estate or interest to be-insured. 2. Proper instruurent(s) creating the estate or interest to beinsured rnust be executed and duly filed for record, to-wit: 3. RELEASE OF DEED OF TRUST DATED March 07, L988, FROM ANJA, INC., A COIpRADO CORPORATION TO THE PUBIJIC TRUSTEE OF EAGLE COI'NTY FOR THE USE OF FIRSTBANKoF VAIL To SECURE THE sUM oF $L4o,ooo.oo RECoRDED April 01, 1988, IN BooK481 AT PAGE 514. SAID DEED OF TRUST WAS FURTHER SECURED IN ASSIGNMENT OF RENTS RECORDEDApril 0L, 1988, IN BOOK 481 AT pAcE 5l_5. EVTDENCE SATTSFACTORY TO r,AND TrTLE GUARANTEE COMPANY THAT LARCH, S.A. rS APANAIT{,ANTAN CORPORATIoN. CERTIFIED coPY oF RESOLUTION oF THE GOVERNING BoARD oF IJARCH, s.A., APANAITTANIAN CORPORATTON, (AUTHoRIZING THE ExEcUTIoN oF THE NEcEssARYDOCI]I'{ENTS). SAID RESOLUTION MUST BE PROPERLY CERTIFIED BY AN OFFICER OF THECORPORATION WITH THE CORPORATE SEAL AFFIXED. SAID RESOLUTION MUST BESUBMITTED TO AND APPROVED BY I,AND TITLE GUARANTEE COMPANY BUT NEED NOT BERECORDED. EVIDENCE SATISFACTORY TO THE COMPANY THAT THE TERMS, CONDITIONS ANDPROVISIONS OF THE TOWN OF VATL TRANSFER TAX HAVE BEEN SATISFIED. CERTIFICATE OF SATTSFACTION ISSUED BY THE CLERK OF DTSTRICT COURT OF.TUDGI,TENT IN FAVOR OF STATE OF COLORADO DEPARTMEN? OF REVENUE AGAINST FRANKDALESSTO IN THE AI{OIINT OF $2,5LO.72 PLUS cOURT cOSTS ENTERED oN Augusr 18,1986' TRANSCRTPT oF wHrcH wAs RECORDED December 3l-, l-996, rN BooK 4s5 ATPAGE 89' CfVfL ACTION NO. 85 CV 626, DfSTRTCT COURT rN AND FOR THE cOUNTyOF EAGI,E. WARRANTY DEED FROM ANJA, rNc., A coroRADo coRPoRATroN To r.,ARcH, s.A., APANAI,TANIAN CORPORATION CONVEYING SUBJECT PROPERTY. THIS PROPERTY IS SUBJECT TO THE .IOTNT RESOLUTION AND NOTICE OF ENCIJMBRANCEOF UPPER EAGLE VALLEY CONSOLIDATED SANITATTON DISTRICT AND VATL VALIJEYcoNsoLrDATED WATER DTSTRTCT RECORDED JANUARY L8, L99O rN BOOK 521_ AT PAGE44L. 5. 6. 7. 8. PAGE ALr"l"oMMrrMENr SCHEDUL,E B-2 (Exceptions) Application No. VIil-37-3 The poricy or policies to be issued will contain exceptions to thefolrowing unless the sarne are disposed of to the satisfaction ofttre Company: L. standard Exceptions l- through 5 printed on the cover sheet. 5. Taxes and assessments not yet due or payable and specialaEsessments not yet certifled to the Treasurerrs office. 7. Any unpaid taxes or assessments against said land. 8. I-,iens for unpaid water and sewer charg'es, if any. 9. RIGHT OF WAY FOR DITCHES OR CANALS CONSTRUCTED BY THE AUTHORITY OF THEUNITED SEATES AS RESERVED IN UNIEED STATES PATENT RECORDED July 13 , Lg3g,IN BOOK 123 AT PAGE 6]-7. 10. RESTRICTIVE COVENANTS, WHTCH DO NOT CONTAIN A FORFEITURE OR REVERTERcLAUsE, BUT oMITTfNc REsTRfcTIoNs, IF ANY, BASED oN RACE, coloR, RELIGION,OR NATIONAL ORIGIN' AS CONTAINED IN INSTRUMENT RECORDED l{arch 05, L974, II{BOOK 233 AT PAGE 628 AND AS AI,IENDED IN INSTRWENT RECORDED Septernber 24,L975, IN BOOK 24L AT PAGE 950. 11. UTILITY EASEMENT THIRTY FEET IN WIDTH ALONG THE SOUIHERLY LOT IJINE OFsu&TEcT PROPERTY AS SHOWN ON THE RECORDED PLAT OF VAIL/POTATO PATCH. ].2. EASEI{ENTS, RESERVATIONS AND RESTRTCTIONS AS SHOWN OR RESERVED ON THERECORDED PLAT OF VAIL/POTATO PATCH. L3' TERMS, CONDITToNS AND PROVTSIoNS oF THE iTOINT RESOLUTTON AND NOTICE OFENCIDIBRANCE OF UPPER EAGLE VALLEY CONSOLIDATED SANITATION DISTRICT AND VATLVALLEY CONSOLTDATED WATER DTSTRTCT RECORDED JANUARY L8, 1990 rN BOOK 521 ATPAGE 441. NorE: uPoN EVTDENcE sATrsFAcroRv ro rHE coMpANy IHAT sArD ENcuMBRANcE HAsBEEN pArD IN FULL, SArD EXCEPTION WILL BE DELETED. PAGE 3 o DATE: JAN 9. 1991 LEGAL: LOT ADDRESS:POTATO PA OWNER: ARCHITECT: 29 BLOCK 1 FILING VAIL POTATO PATCH CERISOLA RBSIDENCE pnorue * SNOWDEN & HOPKINS PHONE # 29,0 97.0 (5.0)0.0 (15.0)0.0 UNIT ONE 796.0 0.0 28.0 0.0 0.0 0.0 7,0 I sTt :, FLOOR::SQ-FJ::,,2,254,0 0.0 250.0 105.0 110.0 0.0 21.0 2ND. FLOOR SQ.FT,2,33't.O 571 .0 25.0 0.0 94.0 65.0 34.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 )R.so,:F[;::,r:0.0 0.0 0.0 0.0 0.0 0.0 0.0 :,1;290.0,,CREDIT TOTALS r03.0 ,204.0 :50.0:: 0.0 29.0 97.0 (s.0)0.0 (15.0)0.0 0.0 GRFA USEO,'. .!, ..r ,:, r:4,091.0 (4,091.0) Town of Vail Conmunity Development 75 South Frontage RoadVail, Colorado 8L657(303) 479-2t38 Plan review based onthe 1988 Uniform BuiLding Code Project Nunber: 1.991 Address: Lot 29, Block 1, Vail potato ptch Occupancy: R3rM1 Tlpe of Const: V-N Name: Cerisola Residence Date: January 9, L99LContractor; Beck and Assoc.Architect: Snowden c Hopkins Plans Examiner: !.IICHAEL I|HIBAKER Portions of the rnaterial contained in this program are reproduced from theUnifonn Building code ( 1988 edition) with pernission of International Conference of Building Officials SHEET IDENTIFTCATION CORRECTION REQUTRED **** 2 A-10 3 A-10 **** **** Vent Access **** AlI electrical work to be conpJ-ete to the reguirenents of the 1987 NationaL Electrical Code. Provide attic ventilation that complies with section 3205. (c) Provide an attic access (22X3O nin) to each atticarea.-- Sec. 3205. (a) This project will reguire a site improvement survey. Such survey sha11 be subnitted and staff approvedprior to a request for frame inspection. Areas delineated as crawl spaces or nonhabit. basemnt. shaIl have less than 5r lrt. from earth tostructural floor/ceiling above, a dirt floor only, be ventilated as per UBC 2516, with access nin. sizeas per UBC 2515 and maximum access size 9 sq. ft. Snoke detectors shall be located outside eachsleeping area. A detector shall be located on eachlevel and in the basenent. Detectors shall be interconnected and sound an alarn audible in aILsleeping areas of the dwelling unit. UBc 1210. Only one wood burning fireplace may be installed per dwelling unit within the Town of Vail . Gas appliances with trBtr vents only are not restricted under this regulation. ******** 6 A-2,3,4 Srnoke Dtr 7 A-2 13 r4 one wood 8 A-4 Skylights Materials for sloped glazing (skylights) shall be tempered over laminate or as specified in UBC34O2r3,4. Plastic skylights shall be as per UBC5207. Curbs for skylights nay be required depending on glazing material , slope of roof, and flashing used. A bathroorn is reguired to have an openable window or a nechanical venfilation system. -- Sec. 1205. (c) In bathroons with a tub or shower and in laundry rooms a mechanical ventilation system connecteddirectly to the outside shall be provided. Bathrms which contain only a water closet or lav. nay beventilated with a recirculating fan. UBC 1205(c). Dornestic clothes dryer exhaust ducts shall beinstalled as per Irl{C 1104 and 1903. Flexible duct connectors may not exceed 6r in length and shall not be concealed within construction. Ducts shall tenninate outside tbe building and not exceed 14 I length. In buiLdings of unusually tight construction (all new construction within the Town of Vail), conbustion air sha1l be obtained from the outside. Such courb. air openings shall be as per ltl,lC Ch. 6 Factory-built chinneys for fireplaces shall terminate a ninimun of 2t above any point withln 10thorizontally away. tl,IC 9L2. A chinney enclosure for a lrood burning fireplaceflue sha1l be protected by a one-hour fire resistive construction. UBC L706. This involves lining theinside of such chase with 5/8n [lpe X sheetrock andfire-taping joints. Gas fi.replace appliances are required to beinstalled as per listing installation instructions -with a trBr vent only. Conbustion air must be supplied from the outside for all new constructionin the Town of Vail. Furnaces not listed for closet or alcoveinstallation shall be installed in a room or space having a volume at least 12 tines the voluroe of thefurnace. A boiler unit will require a space 15 tirnes larger than the boiler. IIMC 504 (b) Supply a nechanical drawing indicating design of system, size (BTU and volurne) of equipurent, vent location and tennination, and combustion air to be supplied. g A-2,3,4 10 A-3 flout opgs Laundry 11 A-3 Laundry 12 A-3 Mech Room 13 A-6 Chimney 14 A-3r4 Enclose L5 A-2,3 Gas ApI . 16 A-3 Mech Room 17 ****Provide I LB A-2r3r4 A1I Due to Colorado State Statutes, as sink faucetts and shower heads are required to utilize flowrestrictors. Also, the naxinum water closet flush usage is 1.5 gallons per flush. 19 A-4 Custom The custom buiLt (unlisted) fireplace must beinstalled as per IIMC Table #5-A for clearances and uBc Ch. 3'7 for hearth and uantel size and location. 20 A- ALl stairs A handrail is required along a stainray. It ls reguired to be 34 to 38 inches above the nosing ofthe steps and if the side is open, the maximun sizeof an opening in the railing at the staimay is 5 inches. -- Sec. 3305.(j) & 1711. 21 A- Guard rail A 36 inch high guardrail with a maximun opening of 6 inches is reguied where step is greater than 30 inches to floor or grade below. -- sec. 1711. 22 A-2r3 Under strs The enclosed usable space under the stairs is required to be protected by thr fire-resistive construction. -- 3306. (ro) 23 A-6 **** Unless the lower Level is clearJ.y strown as a basement (6r or less frou floor above to grade for 50* of building perirneter), a 3 level dwelling willrequire 2 means of exiting from the 3rd. level if3rd. level exceeds 500 sq. ft. UBC 420 & UBC 33o3 (a) . 24 **** Provide A one-line eLectrical drawing for each level is reguired for this project. 25 **t r. Provide rnclude a copy of the soils report for the site to be buil-t on. -- Sec. 290s. (b) & (c) Town of Vail Conmunlty Developnent75 South Frontage RoadVail, Colorado 81557(303) 479-2L38 Plan analysis based onthe 1988 Uniform Building Code Project Nunber: 1991Address: I.ot 29, Block 1, Vail potato ptch Occupancy: R3rMl Type of Const: V-N Name: Cerisola Residence Date: January 9, 1991Contractor: Beck and Assoc.Architect: Snowden & Hopkins Engineer: Plans Examiner: IIICHAEIJ WHITAKER NOTE:The code items listed in this report are not intended to be a courpletelisting_of all possible code reguirenEnts in the 1988 UBc. ft is a guiie toselected sections of the code. Portions of the naterial contained ln this program are reproduced fron theUniforn auilding Code ( 1988 edition) with perrnission of -tnternational Conference of Building Officials AREA I{IN.LTGHT MIN.VENT NO.EXTTS EGRESS 2 Living.Kitch,DinrLib2 Powder bath room2 Air lock2 carage2 Storage rooms2 Hal1s, closets, etc. TOTAL FOR FIOOR1 l,Iaster bedroom1 l.laster bath1 Bedroon #21 Bath room #3L Bedroom #31 Bath room #4L Laundry room1 Mechanical Room1 Storage Rooms1 HaIIs, closets, etc. TOTAL FOR FIOORB Bedroom #4B Family roonB Bath room #5B Storage roomB Halls, closets, etc. TOTAL FOR FISOR BUILDING TOTAL L305 40 55 57L 25 325 233L 32L L01 288 64 26L 70 91. 105 250 703 2254 278 289 73 28 L28 796 4585 130.50 0.00 0.00 o. oo o. o0 o. oo 32. 10 0. 00 28.80 o. oo 25. L0 o. oo 0. oo 0.00 0. oo o. oo 27.80 28.90 0.00 0. 00 o. oo 65.25 2.OO 3.25 0. 00 o. 00 0. oo 16. 05 5. 05 L4.40 3.20 l_3. 05 3.50 4.55 0. 00 0.00 0.00 t_3.90 L4.45 3.65 o. 00 0.00 No No No No No No Yes No Yes No Yes No No No No No Yes No No No No Yes 1 1 L 1 1 t t LI l- 1I 1 L 1 1 l_ 1 1I LI 1 L 2 FOOTNOTES !L) EGRESS - An operable window or door that opens directly to the exterioris required from this roon. The minLmum clear openable area nust meetthe following. -- Sec. L2O4.1) The rninimum clear height is 24 inches2) The rninimum clear width is 20 j.nches 3) The minimurn clear area is 5.7 square4) The maximurn sill height is 44 inches2) The nurnber of exits is based on Table 33-A3) A rnechanical ventilation system nay be used openings for ventilation. -- Sec. 1205. (c)4) The requirement for an egress wlndow in the Sec. 1204. feet (Dwellings)in in lieu of exterior basement is based on ROOM DIIi{ENSIONS: Habitable space shall have a ceiling height of not less than 7 feet 5inches. Kitchens, ha1ls, bathrooms and toilet compartments rnay have aceiling height of 7 feet measured to the lowest projection. If the ceilingis sloping, then the nininun height is required in only L/2 of the area. --sec. 1207. (a) Every dwelling unit shall have at least one room which has not less than 120 square feet of floor area. Other habitable rooms except kitchens shall have an area of not less than 70 square feet. -- Sec. L2O7. (b, Habitable rooms other than a kitchen sha11 not be less than 7 feet in anydimension. -- Sec. L2O7. (c) GI,AZTNG REQUIREMENTS:1) Aft glazing in hazardous locations is required to be of safetyglazing material . -- Sec. 5406. (d)2) Note windows and doors in a tub or shower area are reguired to besafety glazed regardless of the height above the floor. -- 5406(d) 5. SUOKE DETECTOR REQUIREIIIENTS: A snoke detector is reguired on the ceiling or wall at a point centrallylocated in the corridor or area giving access to each sleeping area. -- Sec. 121-0. (a) 4. The snoke detector is required to be wired to the buildingrs power source. -- Sec. l-2L0. (a) 3.A smoke detector is reguired in the basement. -- Sec. 1210. (a) 4.A smoke detector is required on aLl stories. -- Sec. 1210. (a) 4.If the upper level contains sleeping roorn(s), a smoke detector is requiredin the ceiling of the upper level close to the stairway.--Sec. 1210. (a) 4 FTREPL.ACE REQUIREMENTS : FACTORY BUILT FIREPI,ACE:1) Unit must be an approved unit. -- Sec. 3705. (a)2) Clearances and hearth size must be per manufactures approval . -- sec. 370s. (a) & (b) 3) Chinney height must be per nanufacturerrs approval and Table 37-B OCCT'PANCYSEPARATION : Betyteen the garage and the residence, materials approved for thr fire construction are required on the garage side only and any doors betweenthe garage and the residence are to be a self-closing L 3/8 inch solid core door. -- Table 5-B & Sec. 503.(d) ex f;3 STAIR REQUIREMENTS: A staimay in a dwelling must be at least 36 inches wide. -- Sec. 3306. (b) The maximun rise of a step is 8 inches and the rnininum run is 9 inches.-- Sec. 3306.(c) exc.fL Provide a handrail on one side a stainrray 34 to 38 inches above the noslng ifthere is 4 or more risers. -- Sec. 3306. (j) Provide a guard rail where drop off is greater than 30 inches. Minimum height =36 inches, naximun opening size = 6 inches. -- Sec. 1711. exc L The minimum headroom is 6 ft.- 8 inches. -- Sec. 3305. (p) Enclosed usable space under the stairs is required to be protected as requiredfor thr fire-resistive construction. -- Sec. 3306. (n) ATTIC REQUIREME}flTS: 1) Provide an access to all attic areas with a clear height of 30 inchesor more. The nininum size is 22 inches by 3O inches. There must be 3O inches or more clear height above the access. -- Sec. 3205. (a)2) Provide ventilation in all attic areas. The net free vent area isto be not less than 1 square foot for each 150 square feet of attic area. The vent area may be L/3OO if at least 50t of the required ventilating area is provided by ventilators located in the upper portion of theattic. The upper ventilators nust be at least 3 feet above the eve orcornice vents. -- Sec. 3205. (c) CRAWLSPACE REQUIREI'IENTS : 1) Provide ventilation either by mechanical means or by openings in exteriorwa1ls. opening strall provide a net area of not less than 1 square foot for each 15o square feet of area in crawl space. openings shall be distributed on two opposite sides and be located as close to corners as practical . -- Sec. 2515. (c) 6. Note: Vent openings may be reduced to lot of the aboveif ground surface area is covered srith an approved vapor barrier and thebuilding official approves.2) Provide l8-inch by 24-inch access opening to the crawl space area. Note: opening may be required to be larger if mechanical equipment is located in the crawl space. -- Sec. 251-6. (c) 2.3) Unless the wood is listed as an approved wood of natural resistance to decay or treated wood, the ninimum cLearance between exposed earth andfloor Joist is L8 inches. The mininum clearance to beams and girders isis 12 inches. -- Sec. 25L6. (c) 2. ADDI TI ONALREQUIREIT{ENTS : For R3 occupancy THIS PROJECT WILL REQUIRE A SITE II-IPROVEIIENT SURVEY. SUCH SURVEY SIIAI,L BE SUBMITTED AND APPROVED PRTOR TO REQUEST FOR FRAUE INSPECTION. ALL CR,AT{L SPACES WITHIN THE TOWN OF VAIL ARE LIMITED TO A EARTH TO STRUCTURAL FI.,,OOR CEILING HEIGHT OF 5I, BE EARTH FI'OR ONLY, BE VENTII-,ATED AS PER UBC 2s16(C)6 I{ITH ttINIUrfi ACCESS AS PER UBC 251_6(C)2 AND MAXIMUM ACCESS OF 9 SQ. FT. ANY BUILDING SITE WITH A SIOPE OF 30 DEGREES OR MORE SHALL REQUIRE AlI ENGINEER DESTGN. SUCH DESIGN SHALL ADDRESS DRAINAGE, SOIL RETAINAGE, AND STRUCTURAL DESIGN. ADDRESS NI'MBERS SHALL BE POSTED PI.AINLY VISIBLE AND I.,EGIBLE FROM THE STREET. For I{L occupancy SIOPE GARAGE FIOOR TO ALI-,OW FOR DRAINAGE TO OUTSIDE OR PROVIDE A FIOOR DRAIN WITH WITH SAND AND OIL INTERCEPTOR TO DRY WELL OR TO SEWER. ANY GARAGE FLOOR DRAIN CONNECTED TO SEWER MUST BE APPPROVED BY UPPER EAGLE VALLEY WATER & SANITATION DISTRICT. \ (\) ft$ l'-'\f \i ' _-t- \_il . $ '-t(\: :l- \tI \ .I ( \f .t N $s u t ) \ [\ TL - l- F \il t$' 'N:8, S-': \ \ {' A ri -:- |\- N si 4,t6t t i'\) F s \ gt o ovt s \u\ ..\r N $t' \n t\ : s Es 'N-s $ \\ ..f\ r\\ I \ \ \ \ N N N .ss! N N 5 F I -ii0licTrl RNiNf$-+ I .OI N 6 E \\-\: I = N aO flI VI q ?r ET 72 -( N ss:L -\ NS E\ $ SN:F z K s Fs $ s $ $ t\-.:\s .i_\ N il;t; s\rb r$ r\ u $ t -ta: tl I ; s, t^ 6t n s N ,!> s\I \$ .,,: U qo Fn^ NNa\tr IR:N\'{\i : N s { rl I sN *$ $N''N'q -s R sv NE\\r'r-Nt- ;/ffi$ldF- s v l !rN \sr:$rJ_,.s.i $ :,\ :R\ b"ll'; tA #* f ,7'i2 f:,.c: N+ \-+$s{s Ns N E\$ 'l J'< o P tn A 0" 7?-r {r9-st Ih-/[a :t:a ,{r 5 \+ N \ s $--1 $ Fo + o0 0 fi 1 no 0, :i O,N.N -\ 5 -\. \_ L tle\\ \\ Ns# s- s= z_.FN b-:.EtTF*F' ct\i liR\+\Ni irN' \$t-s N\. .\e_ . > ._o*-- ''i$ ^:- -'rNN-Sr\. -rs.\.$-s .\s'-7 \\-+'\Ns' N$--+s' N&4l 5,t?'..\'/ ts t'>z h li5i*fl . ( '\-t G-t J-VJ -=- 5.-:_ (r{ \g ,/t-_ \3-.Doo o; J*a+ v "{j"i$Rdo L'l t rb v-l e r0 L,4 ri\ il o tF$*+ + Lo|)?\ \I I \ I F CiI l' t-\ 4, o[ n ^lV1 llIIt!ltl!titl A | \,s' Pr C f - - \r b (r e f e /rr\ I il= /)o f. rD) , -"\ R' J.-_\_ fJ,j-ryd *Jcg o'- s I nE0FEB 1 tliitl Snowdon and Hopkins 201 Gore Creek Drive Vail. Colorado Architects 303-476-2201 81657 February 8, 1991 Me. Susan Scanfon Environmental HeaLth Officer 75 S. Frontage Road RE: Cerisola Residence Dear Susan, This letter is to confirm my understanding of our meeting and two telephone conversations regarding the Cerisola's fireplaces. We undeistand that we are permitted a wood burning fireplace in theliving room, a gas "g" went appli.ance in the master bedroomr and an antique fireplace fitted with an "A" vent which has 9" 9a8-logs in-the fam-ily room. Mr. and Mrs. Cerisota will confirm in writing that this antigue fireplace will alwaye have gas logs. Please let me know if this is correct. Sincerely, Pamela w. ttopkins Partner PWH/elh Enc. BECK AND ASSOCTATES, tNq::"i."iiiffiS'll: '""1 vAtL, coLoRADO 81658 (303) 949.r80O TO n b+ $Q-'.:.\uJp, WE ARE SENDING YOU n Attached n Under separate cover via ! Shop drawings I Copy of letter E Prints I Change order ! Plans LtrTTt @F TRANSnflITTAL n Samples the tollowing items: n Specifications oo" -. l=o/q r', JOB NO. Irrrerur'oll;]:li-M.I l'c\'Cto,^yM.r*- C-.,-oL DATE NO.DESCRPTTON t THESE ARE TRANSMITTED as checked below: n For approval f5or ro* u"" I n As requested ! Approved as submitted I Approved as noted I Returned lor corrections ! Resubmit-copies for approval ! Submit-cooies for distribution I Return -corrected prints n For review and comment n ] FOR BIDS DUE 19 _] PRINTS RETURNED AFTER LOAN TO US COPY TO SIGNED: l?ic]o!/cl tl92 -tu&-! nc GoloD. lbs orl7r. T0 ordipHoNt ToLt fREt r-8d]aa.6s0 ll enclosu,es are not as note<t. kin<llv notilv us al once. RETENTTO{ EIU3II\EERIMi II\EOFIPffiATED 5320 t^,. CIUARLES D'RM Sl-B LITTLETO!, CO-fflADO 80123 (303) 933-1133 CRIBWALL STABILITY CALCULATIONS I!lltJ.ltl,ll : !..et i-rtl;r I l:'tt:.i r.ll-'trr-t-, l-t-I-.J\ | l{I.l : .,!ai l. [-ctlr-:t .ttjti t-I iF_|]fl iEt) ; .Jrrlv lU. l'i'?r.' DESIGN DISCLAIT€R: Ilps': r:alct.rl.:L.irlrr:; ltave- becrr J:reoared as i rr?llr esettl..aLi.\.'r: .:lrt.rlvs:iq [r11- t;11i1 iljc drsiorr Dr']r'an€lt€rf-s ' Il i.'l l.l n: l i:st lLrr l.::.r l:i l.r t.r ,:lI t.he l)r ctie:ct L]t'tt ter l-r: r'9'<-ro l'/E ,-r-rr r€!:t tJ1;Li':ln rrl r:!t)le rt dr-tt: LO r:.}-i ll tQF..Ll Ct.yrrjitiotrs r?l lC Or-n I Lel-eLt rjr-,r irrg Lln: nr Cr--lr €'Ga, O t ;- r\' D,.)t L j rft l Cl I f.l re t.'t Ofrt:Ser'l t^'t:r'|, . ll,,-: l:r oiet L f],..q it:r- is t e!;L'(--'tt:ible fc-'t tttttt;tcl:rrttl [it-[ettl"iot Itrr:littt:-.'t ittrj lttc. {.',(-r],";-i j | 1..:'l) l)f ir.rr lr.t rrr:il tlrrj clrlv "r l l.rir .: [- icn ts or _ r- l r..l l,_lra,: . ,| rrL I tlt I lurr rnelrrrnln{oor, 'q/ { eo scate paee / or .f - rilcoRPoRATEo sualEcr (2coq/^/,BY J c,/) /?/r.tr.r,/tt , ,//,zl r t'qS/s 6,i'/a i / = 3z' .// ' iztr gl = z'cz i",-i ' t.*p 13 ./- (qcoVr&) = a"sz ' .5irr-a16,>7-r:-, fl = 7o- zr72? | /o/tcsto-t, a = a F7u,.",a,/ra/ /-l-'J y'7"rr,," = (k/)(\.) li= '7)nias-() =.o.saz EFP = (a'a-716t"i'--i = J2"/ %'' " u/'1(- la fri' ,//,//rto.rrt :,/c-,/7',r.t't.;r ./'frs.r,l,'e = )1oo 2/ "- B,z //r,' = 1,/a,'/tr,r/ d = 45 /l = 4./' y'a,r/)"c Erltt P/-'zr- t?g*rd:l/ = //.o' /. SPrr.'/r./r''+ "';/ >- ,r: s. / slV,) >- ,/. s o V: s. /6ra'' .tlzt'.t-.>,2/ ) E 5. (a,,1 s*r't7/l ) /.o >\ ./, s?2 )- /' s-o ffiffi jj rr.- | Lll I lvla | enctnrrnlncf oarc /64 so scaw f f ilcollPORATED- sue.,Ecr &z?ri/ *7,21'2, J- J /J);2 PAGE <. OF lrP/lStS BY fi = /r*:> //ll . / _]:tl-l_l l-i-lll Iti-l l-l-l.lv- / /r /zqr', 4/v, /,ryr, dl( /aFr,'fi =lz)(t.o)= 1,2',.-d---_=i----T a,r,fr # + { I 0 t,trt)\7 P.lA'12)so)Qz)'-- o /oe a.# r/a7rr gd /a ? t*7/ /'>7r' / 1-= rnt " L_ f ,,1/ = B.S cleajr,d sa/tu frtu /'/e // $ii.':rilrgi.'itEl ffr,-L 1r....".'-'iDftiil'dw / s/ ,t.tyrr Al,lfiffillli?.i'-, pncr J or d eY J Lt> t1,'s,17t.+.{ rlro -' = 7t tAD / / Z's'- (2, ae")1v.' ) *A 7.')1 c.,,'':) = 4rsJo{--,-.- ,l--^ = /8,7b ( 4r q Frs, t/rr' rl4vztrt:/i,nr'ns = (, z)<ta)(A,sa)(4{ )'- 56t35{ = 3,o /2/ (ta>)(3.5")(21) z trs.(o.2.) = :7t4?Z/d 7za nlR - ,2r%7 '/) FrTd (.oo z'/..u= ftz)ttt)as)r ("")(s's) =/J.ze/'ada = /4'.//o ,l t-s ( s/'/) yll/ -5str4f t,.t:':- = (a' tto.)(a c'Q = Z-14 >./'s-D 4,o,so : Kr?4. rs (s/,"))r,i'//tttu/ ;.ijt,r/i r,'.lt =z.gs >/.sa , ,> f-t ft tt I Z/: f/T -:zir/,C /)= /ar/( (8't) zl;t z/1'/orcw)C 2-'P i (t-s,zz"Y/) - /,ct's+/,{dg = 3, z/S zt) ("'t)' - /.53{ = ///zt*,/l = J3aa %,/. 5,./ -- /tL(o '4''/og /.r/ u 5T :n, .L D9 tal 0l g,$.1 oEl '"d taat i.tst fitl' ,r , ttl f vll .i' 11 'A il ffr ?+ :fu\icalu!u, ..rsr'S-Z ''S ,(* f;: n rh :.5 'i ,#, s/r/,/',/7t'i, p.,zrytd@.*) = /3!gr= ZO I tttt EI a tutl ^f fnClnrfntnfl oarc/&'/u//9o scar-sl paee 4 or 5-. - lilcllRP0RATEI| suBJEcr a'( JLts Lty'r.,-s, /-t ..'. /,,/ -t / 57o4. /t /.1 ///)r/y'5/ 5-=a:::==:=------- =::=---:: Crzr//)aro/ ,/-), z/n -, C; = cr, 7 /eoV '7n',,, /.?n?n /--y' = 4,r"> *'7' So/t,e tt/ror/.l- z/r.7.z1 /: 7,-rs ZP = 4,'>tio UY ,rl*t))ztu.z, ,{/.= (z,c)(t,s) .= LT DL 5.Sa ( b. 7 /.,v-:) ,/ ,r'7cr,/f ,24s,-f/r,,rrz //r-vr s /s/ /rr/ 3/-d 4 i/t slrt L J/t 7/4 /r.9'ts.a7 - ? (2 a.u7 = y' ,.;:' 0.6 / -= C t.4 o.G7 = "P @ o'+'/ = /Z e o'c? = /s € o.c'/ = o. G;i /.3 4 ?,L8 4.,t2 ti' r-r'l I t,,24 /o.o-{ 'V,,>-rof/.sa) -= ,ffiffi t': 'la 1.0. r-i aI aaaii /|rU lr- | Lla r t r, r. I f nClpf tnlUC}arc. ,/BJu+ .?4 ssu-s - lilc0RP0RATEll- sueuec -, Fr*''ert 5/-o/, /, , prcs 5 or f, - ' ,|/q ./-lzr/*t-s- av JLr2 B\ A t\ t$ U IN' '[q h \\ \rll'.\ V\ \ \ \ $'! n\ R fI '..J ll nt\t D, \ h ,\ \l$'l\ lt ::\ t' N h \ t---1 \s \\ N H L-J \i! $v ll \ \\ \s{ \ \i$i' ,r i\ i'\.) \{ It it i u- 1t,l sii *A \ t\ \n,li (l -\) {- \J-{ \$ .x N Ill s Y$ \\ Aq. st * \r \l .n 'a\ rl \t. *. \\.N R V\ "?.r'id: s\ tt) ) $(i' tA $\ $j N $\ \; $,\t rn sJ s\ \ Lrc\r\l o\) \ Nt $ N N \\ N \ \l$ rl s \.) t.r \ \ a\ r"l o \) s \..) \t\ \ R ni; \ \I \ tlt tr ,Its cv) \ \\ |rncttEEnttto-p^'. :kI lilc0RP0RATE0- "r"rr"r ':,i:tnit''r'<)F-'n r,rr''' \..-\X r-- la. /-].. ln ''? ". r', - It'?P\.,tt Sua-ro ^-t, Jc>-.eR (r:se-rv-ucrroS +@,.*\ ,.-aa.\\ A>rnr-rl-Ji- -rD El.:-:r" .ltr'e- oV tlot-re. KEVt-iDilE f-L-rll l.ltr.r(:r \JAtt-I 'il.I Det\rE\^hq lh6 olongaled loll !oc on provldor addltlonll steb ty lor slrsl0hl wall! !! th6 tril Remova tho oxlrndrd tt[plrc.! rt th. groov!! tqr.ru-m th! btock thap. toll! 3C rldr! whrn bu dtnslhhl convox curyo!. 12e76rKEY Bmmzsot C) GEOGRID PIACEMENT CHART Slnce actual proJ€ct condl ons may vary from lhose assumed In th€ dsv€lopment of thls ihart. lt ls lmportanl lo recognlze lhe condl ons for whlch lh€ chart appll€s, whlch arg: . Th€ b€arlng capaclty of lhe foundaUon solt be low the wall ls adequat€. (maxlmum requlred al- lowable_bearlng capaclty lor lhe cases presenl- ed ls 35tn psf) . In casog A,In casos A, B, and C, lhe relnlorced wall llll. re talned backflll, and foundallon solls are sandysandy sllls or gravgly sands whlch have a stronoth ddlh€d by an effecllve angle ot frlc on of 3F, zero coheslon and a molsl unlt welght of 125 pcf. . Both tho r€lntorcod wall llll and retalned backlill are well dralned. o Mlnlmum faclors of saf€ly ar€: 1.5 agalnst reln- lorcement pulloul and relnforcemenl iupture; L5 agalnst.oxlernal slldlng fallure; and 2.d against exlernal overlurnlng. . Thls geogrld placement chart ls presenled toglv€^ the- deslgner/speclf ier a representa vemod€l ot how oeogrld placement and lenolhcan vary wlth dltter€nt relalnlno viallqeometry. soll lyp€s and loadtno condl ons. {Not ]or f lnal deslgn or construcilon detail.) 'Tho cho l! lo ba u!!d lor rltlmrllng pulpor!! only. Dtrlon mull bc Drrlormad by r qurllll0d rn0lnoor urlno lclusl d6rlon plrrmtla.t lor lhr Dropoard all! andgrld mrnul!clurerr doolgn crlterlr lor !psclllc Orld lypc. TYPICAL WALL SECTION TERMS Slopo !tablllly en.tysts dlrgram EXAMPLE GEOGRID PLACEMENT CHART' (__r " ifrJt+$#l$,8ftu![s' I 600 Llncoln Elrstl, qltl,te.7-10^ Oinvii, eotorado 80203- I 609 303/860-9021 Chcckod -,,- Dalt.'-' geet -l- ot "9-' hir;*l rra rli! II I l. I 'o t I I I i I I ! I l I i I 'i I I : 'l t .l I "t' '. ii"illii. Y\rrl .. I ll .r ?' !"Y ' sTRUqTURAL ENGINEERq' 1680 unooln Ette€t. Suite U oenver. Coloratto 80203'1609 30gt8E0-9021 Orlonl Chookcd.-.. Dal€ ** slrbrt--3n'.'Ot -3* z "l $ J d F 9 $A =i37 4Feln-lelgri . 11118__i) $ ,'! r ; ii , r.,ti:,i iiii rl I F I I.1.,1:',1,:.:..:'li l.i,:ill';rIri'l:i.ii,l.l!i!,i'::.!.:'J:.,1 'i.;i|.r;Ii:i:ii:ll;i.li "" i - I ' | : :'' r' 'rii:!,:;i.;:iii I ! !' l:: ' 1 ii.l , i' lil Iiii':li'r'l| | i t l i l" iI'r'lirl.::l'- | i 1: I ; :'1 |l.'.li.ii:,ll;ll!::!l'..,l:i 1l,i l,!,1'1"-'i l'- r'i i' l i l"i-l| .'l | | | l' I|'l'.:l;!"l ,rJiii:r. !'i.l.t l..iiv i iii l iii'i;iilli'iiil'i,liil;!'ilil'lll:i;iii:iii'lr:i;r'ilri'i''lI l': t i 1 '"'"' : "i I .'l I kil* it.lllt'l t,t 1 =i il ;l r'!r*.1 ,t I rl' il .l'l R il ;r. ,1., I;,t.!ti rl i-l i,l,lt i ,l ilt' I I '',!:: '',€ |i l-,\i : I\'i\ 6J t t' \i i!a I Ir\ :f ;,"11n.nARHt$&goMF ' l58O Uncoln sriertEuile ?70oriver,_coloraao gbam- t cog308/880,eon1 Prorror No. {lz- .^r, *O o^ro:f-U$g- proteaNamc lrardau bnru"drrv W*d,. anan (0&4.NE *- 6lau . ,,,,0rrsckeo---_Dor6_..-_- €hecr*l-- or 3 , FtrEFq 11 118 : I III I I rl I ;*rl P.PT tti nitl jEol ttpit;!i,;. i :il!;l:l.t i , 'l : i-t-fffiff{#_i'"" ;, , ,1 'ill.ri'l:r;l: li I1::'i:l ";', :t I.l l.-,-. - :l:, ; :,LE(L:* ., Chen€Norlhertr,hf July 18, L990 Beck e Associates Attn: Flank Palme P.O. Box 4030vail O 81558-4030 n n,cn,t,er .l ttn,(IIfEl(rn,r, ol cn,,,FF,,,ns I t'''.,tu'"',t ''n,rrqxc nr (i s( '( r '\l\ 5080 nmrl l5,l Glenwofil St'nrgs. 303 945.7458 303 945 23G3 Sqtcjecb: sr&plemental Subsoil Study for Evalr:ation of Retainirg-Wall Design,- Cerisol_a Residence, Tr||L ,g, Blocl< 1, Potato Patch, Vail, Colorado. Job No. 4 411 90 Gentlenen: As requested, Chen-Norttrern, Inc. cordusbed a srryplemental subsurfa@ study at tfre stfojecU iite to evaluate ttre subsoils alorg the tptrill edge of tle gcng{V for a p-rcposed retainirg wall de.sigrn. We previously corducted a subsoil study for deiigrn of fourdations of ttre re.sidence ard presented our firdirgs on Jw|e 22, 1-990, Jo6 No. 4 411 90. The supplenrental ruorli was cordusted in accordance wittt g,l1r agireenEnt for professiornf erryineerjlg services to Bec]< & Associates, dated ;ruty i, rsoo. 'Ihe firdirys of ojr work ird reccxnrerdations for the retainirg wall design are preserrted in ttris report. one borirg was drilled alorg the edge of Potato Patctr Drive, about 5 feet behird the backside of tfre pt"F'=ea r"t initq "trr' lhe subsurface corditions enorurtered in tlre borrrg-are presented on Fig. 2. Belovt abcut 5 L/2 feet- of various types of rnan-placed fifl ard topsoil, nredium dense to dense sards ard gravels with a variable arcunt of cobbles ard bouLders were encountered. The i"="ftr of a gradation arnlysis perfornred on a sanple of the rntural soil taken fi:orn tlre f".irfo are strcmn ori rig.- z. No free water was encarrtered in ttre borirry at ttre tine of driUirlE ard. the soils were generally nrcist. lhe subsoils enccnrrtered jrr the boring are similar to ttrose identified lV 9. eryloratory pits er,-cavated for tlre prelriors sutcsoil study but apell to ccntain npi.e coLbfes ard boulders. The coarser ard denser naterial al4nrently urderlie-s the shallcrr+er sardy soils liJ<e ttrose encountered in ttre pits. Based on the fiJdirgs of ttre efrtoratory borirg, we recorunend the retailirg wall proposed alorg fhe rehiff side of ttre pnc,perty be de-signed to inpose an active lateral "urUt pr=="ur" of at feast 35 pcf eqrivalent fluid unit weight for a horizontal backsl-c,pe ard sard ard gravel nacmiff corxtition. Ttre prcposed L 1rl2 horizontal to f vei-ticat bac*slop; lurld increase the equiwalent lateral earth loadirg to about 70 pcf. this relativety st-eep backslcpe could erode or beconE locally unstable. Ttre go:ade cculd be flattened to z horizontal to l vertical as reccxnrerded in cir pnevious report or the slcpe could be reinforced with qmthetic aeogrids oi fafric Lo limit tl.e risk of stope nsvenent. Urder this Gckslope 6tditio.,, a surc.l'rarge loadirry on ttre wall- frcrn the triargrular louq+ttq sfrape pius ttre traf'fic loadirg: could be included in the de-sign lateral_ ]*d.t9aefinairq on the final configuration ard location of ttre retainirg wall. the Beck & Associates Jul.y 18, 1990 Page 2 rnaxinun bearirry pressLrre (toe pressure) for Ure retainirg wall bearirg.on ttre coarse grrarnrlar Sufsoi:-s an be taken as 4o0o psf. Ihe slidirg coefficient of concrete or timber bearirg on these rnaterials strctrld be taken as O.45. Ttp passive pressure for ccnpa&ed stnrcbr:ral fil-t or a keyway crrt into natrrral soil can fe tat<en as aoo pci equivalent fluid unit weigtrt. the bac,kfill sttould consist of grarnrlar soif ffu" ttre on-site sarxl ard gn:avel er<clusive of plus 6-i-nctl rnaterial ccxrpacted to at least 95* of stardard Proctor density .at a nrcisture content near "gtLn^. the soil ergileer strofld ev-aluate the suitabiliQr of ttre prcposed nateriil for use as backfitl. The ccnpacted noist weigtrt of tlte on-site soil can be assured as 13O pcf . Based on ttre granular nnterlaL ty-p" qrd ccnqnction, we e-stirnate the backfill will have an effective internal friction argle of 32o. Ttre e><cavation for ttre rretainirg wall is proposed to e>rterd to the prcperty line vtrictr is about 5 feet frcxn the edge of Fotato Patctr Drive. Ttre o<cavation depttl co\rld be between about 15 to 2o feet belcrv the roadvray grrade rnrtrich will severery urderrnhe the roadrnray. I,Ie wderstad that a slot e<cavation tectrrique is berrg considered to onstrueb ttre retainirg wall. With ttris nettlod, a limited section is occavated, the wall constructed ard ttre backfill placed to st4port the occavation face before the next sestion is cpened. We bel-ieve elren wittr tJ.is nethod of oonstnrcbion, that ttre risk of slcpe failtrre belcru the rcaduray will be relatively hi$r dlich would cause dannge to ttre roadr,vay. 'Ihe roadr*ay contains utilities wtrictr rnay need to be rercmted an{,/or reconstrucbed as part 9f !h" pr.oposed deep o<cavation. the distress to the roadr,v:ay coufd result in its-repiaceo'ent. It tns been our o<trnrience ttrat the verbical settlenent betrird a retainirq wall of this type couLd be between about O.2? to 0.5? of tlp wall height deperdirq on the construction procedure.s. This could result in roadway settlerrent on tl.e order of 1 to 2 ilches. A nore positive way to rnake the er<cavation ard reduce the potential for slope failure is to: f-) slope back the e><cavation face to a flatter gn:ade, 2) provide terporary occavation strorirg, or 3) reduce the height of ttre o<cavation. We assune ttlat ffatteniry of the occavation is rrct practical silce it will be well into the roadway. rhe strorirg could consist of sheet piles or driven soldier piles arxt tinber laggrrg that will probably need to be laterally sqported by grouted tie-backs. We e>pect ttrat pile drivirg will be difficult due to the cobble ard bor:lder content ard the piles will probably not readr ttre bottorn of t}re prcposed retainirg wal1 o<cavation. Ihe height of ttre o(cavation could be reduced bry steppirg the cut in at least two tiers. Erren with the tsryorary strorirg systar, scne roadway settlenrent ard distress strcnrld be opecbed. The nagnihrde-of mnrqnent will deperd on the type of shorirg ard ttre quality of its installation hy tne contraotor. We expecb the settLerpnt could be on the orCer of 0.L* to O.3? of tl.e strori:rg waII height or abo:t L/2 itrtr or less. Nornnlly, this rnagnitude of npvenerrt wilt not inpair tlre use of ttre roaduray ard ocistirg utiliti&. The strorirg qgstem strould be de-signed ard constnrcted by ergineers ard contr:actors fanlliar wittr the soil corditions ard terraix of ttre area. We will be awailable for furttrer oonsultation of the proposed construction lvhen requested. A stabilized earttr retajnirg structure is proposed alorg ttre dcffnhtlf side of ttre drivo,ray. I?re earttr paraneters reconuerded abcnr'e can be assr.nred occept tle ( lr,'tt'':'i llt iltr rr.l'r' Beck & Associates July 18, 1990 Page 3 nnxinnun bearirg pr€ssur.e strould be assured as 25OO psf as reccrnrerded in June 22 !.eport. Ihe bearirq pressure can be ilc.5eased try one-ttrird for rnxinrrrm toe pnessure belcp netainirq structtue footirgs. Linitatiors: ltris r:eport has been prepared in accordance with generally accepted geoteclnrical erqine€rirg practices jn tfris area for use ty ttre clierrt for designr pwposes. [?re conclusions ana reccnurerdatiorrs sutrnitted jn ttris report are based ipoir Ure data obtained from ttre e4rloratory borirq drilled at ttre location inatcatea on Fig. l- ard the proposed tlzpe of construction. Ihe natrrre ard extent of sulcsrrrface trariations asross the site rnay not becone erriderrt until excavation is perforned. If durbg onshruction, fill, soil, rock or water corditions appear to be diffenent frcm ttrose descri-bed herein, this office stror:ld be advlsed af once so r€e\raluation of the reconnrerdations rnay be made. We reccnnerd on-site obsenration of er<carrations, fowdat!.on bearirg strata ard t--stirg of stnrctural fil] h'y a r"epresentative of the soil ergineer. Silcerely, CIIEN-}rcRIHMN, INC. Revielrred By our the swec cc: Snqdon ard Hcpkins Arctritects, Johnson:voilard-Ar^ctruleta, Attrr : Attachnerts Attn: Parn Hcpkins Bob Hurures Steven L. Pawlak, P.E. ffihb':f**\aa*i 1s?22 : [tiit,^.'rr,i$ff;ll'b'$:$ ( 'lt':rt'J[..!trlllrr'r r! l1r &d Cerisola Reside-nce ', JVA Job-Nrmter 5410 Dear Pam: At your request, I am writing to restate two of the more important assumptions made in design of the house's foundation elements. In an attempt to reduce the total lateral load imposed to the foundation by backfilled soils, we specified that no backfill would be placed against the interior eight-inch concrete wall running in the east-west direction at mid-width of the buildi"g. The desigrr also specified that the north ends of the interior eighrinch concrete cross walls running in the north-south direction would receive bacldill on both sides to provide dead load on the footings supportrng these walls. These requirements were stated in the design calculations and presented on the structural drawings in the form of "interior finished grade elevations" (see Sheet S1). Based on 15"se 6slmptions, it should be concluded that changing the finished grade profile of the soil in the crawlspace in the vicinity of these walls would have a sipificant negative effect on the lateral load carrying capacity of the foundation. Therefore, we very strongly urge all involved parties to refrain from making any changes to the current crawlspace soil configuration. Sincerely, JVA, Inc, JVA, II{CORPORATED 1319 SPRUCI STREET BOUT.DER, COLORADo 80302 303.444.r951 303.444.r957 FAX ROEERT 8. HUNNE5 OAVID M HOUDESNETL H. GARY HOWTIT THOMAS 5, SOEIL CHRISTOPHIR J. CHOP MARK C, CONMIER MICHAET R HOPT THOIVAS P SKINNER CHARLES B. WII.I(ERSON CONSUTTING STRUCTURAL ENGIN EERS February 75, l99l Pam Hopkins Snowdon & Hopkins Architects 201 Gore Creek Drive Vail, Colorado 81657 ,# MEMB ER 75 louth lronlage road Yail, colorado 81657 (303) 47$2138 (303) 479,2139 March 18, l-991- otllce of communlty deYelopment Mrs. Pan Hopkinsc/o Snowdon and Hopkins - Architects 201 core creek DriveVaiI, Colorado 81657 RE: Cerisola Resi-dence Dear Pan, This Letter is an atternpt on ny part to docunent the circumstances surrounding the trantigue fireplacerr in the fanily room of the Cerisola residence. Prior to your letter dated February 8, L99L, we had nunerous telephone discussions concerning the 'tantique fireplacetr which your clients wanted toput in the family room of their new home in the Potato Patch area. You explained that your clients, the Cerisola's, had an antique cast iron coal stoker which they wanted to use in the new house. I was under the irnpression based on our conversationthat the unit was an heirloorn which they were trying to incorporate into their new hone. f related to you that since the building perrnit for the house had been approved and issued prior to the ban on woodburning in new construction that you were abl-e to construct units in accordance with the previous ordinance. This entitled your client to one woodburning fireplace and one certj.fied woodstoveor two certified woodstoves and an unlinited number of gas appliances in either scenario. You indicated that your cl ient was constructing a ful1 woodburning masonry fireplace upStairs and instaLJ.ing one gas appliance with the approved rrBrr vent inthe rnaster bedroom. In addition they wished to instal-l- the antique coal stoker fireplace, which would be retrofit,ed with agas 1og, in the downstairs family room. The pictures you provided of the coal stoker gave the appearanceof a freestanding unit. Based on the pictures and our conversations which initially indicated it would be installedwith a B vent, I assumed that the installation would be sirnilar to a certified woodstove. After further research on your part, you indicated that in order to naintain the U.L. Iisting and to rneet building codes the log insert would have to go into an A vent. Given what I believed to be the special circumstances surrounding the rrantiquerr unit and the nature of a freestanding unit which would never practically be converted to wood due to the size of the firebox, I granted an approval for that 'lantique" unit to be instatled eguipped with gas logs and an A vent. In a discussion with Frank Payne of Beck & Associates on Friday, March 8, L99L, I was inforned that the rrantique?r fireplace would have reguired a masonry firebox for installation even if it had been eguipped with a gas 1og. Based on this inforrnation and theprohibitive costs required to obtain.the UL Iisting for thisunit with the gas 1og, an alternate unit was ordered forinstallation without consulting this office. This unit had not been approved through this office and I was still under the irnpression that the antique stoker was being installed until my conversation with Frank. If this office had been consulted prior to ordering this newunit or if the new unit had been proposed initially, it wouldnot have been approved under the requirements of the ordinance. There were extenuat,ing circumstances involved with the firstunit which I believed to be a farnily heirloon. Under the ordinance a second A vent would not have been permitted for a new unit installation. f regret the confusion which has occurred surrounding thismatter, but would like to reiterate that the approval given foryour trantiquelr fireplace eras a very specific approval for thatspecific unit and did not unconditionally permit thesubstitution of a different unit. The staff position regardingthis issue is that the Fourth Bay Victorian fireplace is not acceptable for installation in the family roon of your clients' residence unless the upstairs nasonry fireplace is converted togas. The upstairs rnasonry fireplace may rernain woodburning provided this other unit is not installed. We appreciate thatit is not the intent of your clients to convert the Victorianunit at any tirne to woodburning, but considering the circurnstances in this rnatter, we feel we rnust abide by thereguirenents of the ordinance. If you have questions regarding this natter please do nothesitate to contact me at 479-2138. xc: Frank Payne, Beck & Associatep Kristan Pritz, Dlrector of Cornnunity Developnentt cary lturrain, Chief Building Official Ron Phillips, Town Manager Dlr. & Mrs. Cerisola, O!ilners RffilJUii i1l99t' June 11, 1991 cary Murrain Town of vail Departnent of Conmunity Development 75 South Frontage Road West Vail, CO 81657 Dear Gary: This letter is to confirm that the boulder and drainage work at the Cerisola Residence, Lot 29, Block 1, Potato Patch has been done in cornpliance with the attached inforrnation from Craig Robillard's office. This verification of cornpliance has been requested by the Town of Vail staff before a Temporary Certificate of occupancy is awarded. Please call if you have any questions or comments. Project Manager Beck and Associates, Inc. cc: Dan Staneck Mike Mollica 6-t, L l'l ull I rl-! Aprll 22' l99I lls. Pw Hopklns sNor{DON & SoPrrNS AnCHIIECIS 201 Gore 0reek Drlve Vallr 0O 81657 grfiJectr Eoulder wallo & dreinagfe Cerisola Besldonce' Our ProJect Nmber ll9?9 Dear Pam: thts letter wtll curflrn our meetlng of AprtL 2zr l99l ln whldt we dtscuseed end egreed to the followltrgt * All boulders Drrct be installed witb a nini-rr'q of L/S of thclr Daes belot{ a horLzoutal plene rxtcudlnS fron -tbelntsrsection of the htlleide apd the excsvqtlon' (!9" ittached oketch, PB66 3). fhe encavatlon for the bouldera shall nopo aot*rr^raid fron the sale- polnt of lntersectlon. Att bouldere stacked behind tho loweet row of bouldero in a wall ehall be placed to be eure they are rstatncd by thc lowor row of bouldcrs and not aubJcct to slldlng d;m the hilt. f,ardest boulderc should be used for the lowegb row. lYalls phall be battered gtrd ohull be Do more than four feet tall. If wolla are conatruoBed ln accordance wtth thla crlterla they ehould ba stable under nomal clrct.urrstances. Earthgualre forces ffere not cohs ldered in eny snalyees. t lnotber obsenatioD of tho project should bo unde uport conpletion of sll rlte work. rl lhsro sre nutrorous enaller rocks tbat ehould be reroved or gtablllaed lnto the larrdgcoPindi. * n & A wlll size a drainage faclllty for ths wett end of the drlvcway intended to prwldo lubcurfacc dlspooal -ofnornal anounts of runofl (w to 6-year etom) end a overflorr peth for larfor gtorms. I ||'I t- t l I'1"-l 6-9 L 1"lo}.-|7=o 11 A{'.LldC I sel- s11 o rr, d cJ o lrllL)l'l- | lr- l&. Pen f,oPkins Aprtl 22, l99l PaCe t t R & A wtll work with you ond yaur landocape- consultaots tq finsli';'i -;i:;-i";[*hir"s tho- dralnade at thlr locatio ";i *v oltttt' pt"bl*r slted on the property' After our neetlnd f nst wlth Dsve Gleuent and outllned $hat wo'o dlscussed. As r ,riit 't" on vacatl0a-ior-the next aeveral reeksr please norlc wlth Dave durlng ny absenee' IIe hae over LA yeara of fi;;id;;'- io- "u 'f;;;---of dratnase analyela & deFtelt and sl.te dwelotnent work. I wlll be tn touch with R t! A perlodically durlng ny.trlp to. dlscuae [Ul--p.rS..;"--;f tf,"' p""lf"l-*a *iff iollor,r up wtth you wben f 6et back. Very truly Your!' ROBII,LAND & ASSOOIATES b*.,*'A efu"-.^% Cral8 f. Boblllard, P.B- Senlor Consultent 242s/t&/90 te-9L l'|(]H 7tt'2 F-l 4Lr(:''C ' 5t3r- Jrruw o Ms. Pam HoPklns Apd 22.l99l Pege 3 CBOSS.SECTION OF BOULDEH WALL 1/3 BOTJLDER MASS SLOPED EXCAVATION E)(STINGHILLSIDE ,1' A:,,r;ctt' iatEi TEL |:'r.r i..:'r':-1-r::1',r',r 11 i .r f, !t l 1i : 21 l,l0 . ur.ll F . t)l fitrru,)ft,(NDtJM To: From I Btrbject I Datel Pan llopkine I Srrowdon nrrrl \\cllevid CIenent, ti.obil) ar-tl Ceri oola lles i dence I'r'ojecl; No. I lL)7!l l'lay l4 , I99l llopk i ns nnd /\s51y11i6196 As s l'ollow up to craig Robillord's letter of 4-??-gI, I en eendlngthis additlonal lnformation regar<ling th,r' propoged dral,nngeLnprovenenta. Due tn recetrt conc:erlrs exprrlrt,rier(l by the adJacent(downhill) homeowner we bave r.e-evnJuated ih+: plana ior dralnago andlandscaping lmprovenents. rn hie p.evicrus leLter, crarg tnitudedguidelinee for the placeruont ard anchoring of londscapl boulders.rncluded here are detuirs for a stor'ruwoter drairruge facirity Et theend of the driveway. It ie felt that the,se inprovelrentr ar.enececsary for tlre folLowirrg reo$ons: I. Runoff froh upproxlnately tralf th<: r'oof area and noarlythe entire driveway r.'i.ll be corrr.:en t,rat ed at the weet endof l:he drivervay,2, The steepneee of the xite anrl ol' ths hillside lncreasesthe suscet,tibllity t') er.(,sion rlamagie,3, The rrative eoiIs are not er.osion reeirtant.4, ?he landscupe boulrJ.ere mcnt.ioned utrove should not besubjecte'd lo eurf'ace erosio'which crrrrld undemlne thelratability. 1'o addreas theee concerns a d.yr,rnl J. Bystefl i.o proponed to col lectrunoff and enhance subaurface inf i. l.trati.on, ?lhe '<triwell has beeneized to acconrodate the s*year slorm rnnoff to provide a reasonable,leval of protoction without neJor site 'dior,ption durrngcons truct iorr. o The eyetem conerets of.a drop inlet nt the rveet end of the drrvewaywith a pipe connectron- to'tr,"-J"v""rr.- e-.etatl rhonrng the rnret,:|3"";:l"o;il:ll t" attached. r,"uiin'-"urculetions -ir"-..[rr" drpell BUlUfl auanl,tLy | 5-year, I - trour preciptntion : 0.gfl [ncheet dratnas'" l":"._19.i1n,lrv, piiiirr .""r, -'"I.ll = 5000 es. ft.Runoff votune = (.s)(.sB irche,iiiiooo oq. i,t.),8i0 cu. ft. Drrnvel.l Hiiurli, llTil":."ierforaLe<t uranhole, Lr)' deep, w{rh 1.6,, sravel lrvwell Volrrme = 3.14(z x Z)Q0)Back fill : t.14(36 - 4)(6)i.iaiTotnl Volrrnre Pago 2 2449/^L/50 = l-26 cu. ft. = 2(t0 cu. ft. = ,.t*l!-.g};_$* uco-2 vl ..t;tr.lrti l:: ,ri i!':)rrl lilli .rj ;;l tT's.,ri 3s-\sr }ilHF $$$ yl afz b r.-t; i'-- '- { l* .'' $ NF H N N B Htr}| s1 X9 ts sq $ ,r! 9r $Di H\t ilx Phono 10"1.d60,629 | Oenver Dlracl,1n3.,i Zt.M2"6 .O. Box $89 ilverfhorne, CO 90498 Robillqrd & Assc,cicrfes, Inc, lllllrrrrl 11 .! r*$.(aPtr ." ' '. , 1. ,*r'' REOUESTVAIL 'crl TOW rNs ROJECT READY FOR LOCATION: PECTION: BUILDING: ,/ PLUMBING: Soor,*oa/srEEL €Z * - trUNDERGRoUND rou*ot ou r sree@::::X 1 il;l_ ROOF & SHEER PLYWOOD NAILING tr GAS PIPING INSULATION E POOL / H. TUB SHEETROCK NAIL - ELEGTRICAL: tr TEMP. POWER tr HEATING tr EXHAUST HOODS C] SUPPLY AIR )K{PPRovED CORRECTIONS: tr DISAPPROVED tr BEINSPECTION REQUIRED I oor= /-/z -fO rNSPEcroR n&s@ REQUESTV&lL '!rl ONNOF ::'F'FFSTIF: T. ?',|:V!F Vr.-$+E ; r-i. rrusilcrr1 TOW(.r$'. u/u !! , , :/rJ-t t Pffi oor,- ?ft-f fu JoBNAME- THUR FRI .* LOCATION: READY FOR INSPECTION: r) \ tr tr B tr tr tr FRAMING tr BOUGH / WATER tr FOUNDATION / STEEL PLUMBING: trUNDERGROUND tr ROUGH / D.W.V. INSULATION SHEETROCK tr POOL / H. TUB ROOF & SHEER PLYWOOD NAILING tr GAS PIPING BUILDING: tr FOOTINGS / STEEL FINAL tr EXHAUST HOODS tr SUPPLY AIR tr HEATING tr APPROVED CORRECTIONS: DISAPPROVED INSPECTION REQUIRED INSPECTOR ?--r/El:!rs'-- ' .oor= -la. t ! PERMIT NU OF PROJECT ." .l ,{{.--t I llrspicnoN REQUEST VAIL A JOB NAME MON CALLER .<<- READY FOR LOCATION: INSPECTION:rU.F, YED THUR @ TOWN OF BUILDING:PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH /I'VATER tr FOOTINGS / STEEL FOUNDATION / STEEL tr tr tr tr tr tr FRAMING ROOF & SHEER PLYWOOD NAILING INSULATION SHEETROCK tr POOL / H. TUB O FINAL ELECTRICAL: O TEMP. POWER .tr HEATING E tr D o ROUGH Itr EXHAUST HOODS . CONDUIT D SUPPLY AIR ! neenoveo CORRECTIONS: tr DISAPPROVED EI REINSPECTION REQUIRED ,^r, 1- /4% rNSPEcroR TOWN OF REQUEST VAIL I PMREADY FOR INS LOCATION: BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER tr FOUNDATION / STEEL tr FRAMING ROOF & SHEER tr GAS PIPINGPLYWOOD NAILING tr INSULATION tr POOL / H. TUB tr SHEETROCK NAIL tr FINAL TEMP. POWER O HEATING tr EXHAUST CONDUIT tr SUPPLY AIB tr FINAL ,! eeenoveo tr DISAPPROVED tr REINSPECTION REOUIRED CORRECTIONS: INSPECTOR a, nrii6sror DATE NUMBER OF PROJECT ,*r#"'oN\,. TOWN OF REQUEST VAIL } -,--t-€( l>.t t\- READY FOR LOCATION: INSPECTION: Lr JOB NAME CALLER BUILDII\IG:PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V, tr ROUGH / WATER OTINGS / STEEL tr FOUNDATION / STEEL tr FRAMING - ROOF & SHEER" PLYWOOD NAILING O GAS PIPING tr INSULATION tr POOL / H, TUB O SHEETROCK NAIL tr FINAL tr FINAL ELECTRICAL: tr TEMP. POWER MECHANIGAL: D HEATING O EXHAUST HOODS CONDUIT tr SUPPLY AIR O FINAL tr FINAL APPROVED CORRECTIONS: O DISAPPROVED tr REINSPECTION REQUIRED v4 ) er 1f r,a oor= tof ru { $tt lNSPEcrotr 4/rt /i, r-q q t1 f, -A.ta A l aIIEI - T If IITTrE\, I l\rll TOWN OFPERMIT NUMBER OF PROJECT DATE READY FOR LOCATION: INSPEC /\ 41,( | rNs (..t- THUR FRI REOUEST VAILJa JOB ,NAME BUILDING: O FOOTINGS / STEEL PL tr tr tr D tr tr UMBING: tr FOUNDATION / STEEL UNDERGROUND ROUGH / D.W.V. ROUGH / WATERO FRAMING rr ROOF & SHEEB" PLYWOOD NAILING GAS PIPING tr INSULATION POOL / H. TUB o tr FINAL D TI FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: O HEATING tr tr tr ROUGH o tr tr EXHAUST HOODS CONDUIT SUPPLY AIR O FINAL O FINAL O APPROVED ISAPPROVEO EINSPECTION REQUIRED CORRECTIONS: D^rE 2-23-qd rNSPEcroR priFsrop O I DtrFFBTMtrNTT EF XXXXXXX sALEs AcTroN FoRM xxxxxxx ACCoUNT t N0. .TOTAL AlrouNT r 0000 1,l'liscel I sneou= C.s:rh r 0000 i !:1 -::.:f*:.:Li Ul:i:;-;:-;: i::l:; I 0000 F:F,-jrl i t:, i. * !ij:i:;ljl 1 L i.ic,:nlrrr t. {l l:.:!,. l+ lrlr:i:ii:' t:t,r:'f,.. t{i.ii-, Fti:;i:.r.it,: I|{T[':; ,'F:i.Ii]:f'Ei:Ti.L.ril FF.: fjtrL,:'L- t ; t t.,:tri':j{: ].,J,:l : 'i!j'; ,, l.'ii:i r 0000 t 0000 ffmoun t p'e id l'lir. t:i!i !:.1. i:lil I 0000 I r-,en psid !J t [:'i|lfi i]ii. I f, ;: :1 t:l$ ii i,fi."rn'"1,:l r',t't.r-rt"i-rii,:J :' 10.00 | 0000 i | 0000 200 0t. 0000 lzttt J5 | 0000 oFF HoURS [.rsPECnON f!= UCENSES fEES On|ER FEES 0t 0000 41413 .slcN lPtltcltroN :;1 . READY FOR LOCATION: INSPECTION: MON ^\\t ct\so \ CALLER rtltrQ r THUR FRI rusfcnoNTOWN OF heouesr VAIL AM BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. O ROUGH / WATER tr FOUNDATION / STEEL q FRAMING - ROOF &.SHEERtJ ^, .,.^,^x^qooF &rsHEER PLYWOOD NAILING -tr INSULATION tr POOL / H, TUB tr SHEETROCK NAIL q c tr FINAL tr FINAL ELEGTRICAL: tr TEMP. POWER MECHANICAL; tr HEATING D EXHAUST HOODS tr CONDUIT tr suPPLY RtR j O FINAL O FINAL DISAPPROVED tr REINSPECTION REOUIRED XAPPROVED' CORRECTIONS: tr INSPECTOR VIlzltl"l '\ ,tl) t PERMIT NUMBER OF PROJECT INS CTION TOWN OF REQUEST VAIL -l DATE READY FOR LOCATION: INSPECTION: JoB NAME I'un t. '' \Qt<tdo ^z-<-- tr DISAPPROVED tr REINSPECTION REQUIRED }(neenoveo CALLER BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER ffi*ootoN / srEEL WatJA t24.*- tr D tr tr o tr FRAMING ROOF & SHEER PLYWOOD NAITING tr GAS PIPING INSULATION tr tr o tr POOL / H. TUB SHEETROCK NAIL FINAL FINAL ELE DT uF trC CTRICAL:MECHANIGAL: TEMP. POWER tr HEATING ROUGH tr EXHAUST HOODS O SUPPLY AIRtr tr CONDUIT O FINAL tr FINAL CORRECTI ome /O - 3d -?d rNSPEcroR $ : iui,'.,,, ' ',.t' rNsilcnoN PERMI DATE \ - \-- q\ JoB NAME TOWN OF REQUEST VAIL ,.I PMREADY FOR LOCATION:\tn T NUMBER OF PROJECT PLUMBING: tr FOOTINGS / STEEL - tr UNDERGROUND fforrootoN / srEEL tr ROUGH / D.W.V. ,FRAMING O ROUGH / WATER r- ROOF & SHEER " PLYWOOD NAILING O GAS PIPING trr tttsutettor.t tr POOL / H. TUB tr FINAL tr FINAL ELECTRICAL: tr TEMP: POWER tr ROUGH :EXHAUST HOODS SUPPLY AIR tr FINAL O FINAL tr CONDUIT p nernoveo CORRECTION tr DISAPPROVED tr REINSPECTION REQUIRED fn' INSPECTOR ,7 !i '\.,i , i tNs CTION REQUEST TOWN OF VAIL -I' READY FOR INSPECTION: ,MON' CALLER TUES PM,qM LOCATION: BUILDING: O FOOTINGS / STEEL PLUMBING: O UNDERGROUND q.froucH / D.W.V.O FOUNDATION / STEEL E FRAMING o D tr D ROUGH / WATER - ROOF & SHEER" PLYWOOD NAILING GAS PIPING tr INSULATION D SHEETROCK POOL / H. TUB NAIL tr tr FINAL n -Lt FINAL ELECTRICAL: O TEMP. POWER MECHANICAL: E HEATING tr cl tr ROUGH - lo EXHAUST HOODS CONDUIT tr tr SUPPLY AIR O FINAL tr FINAL PROVED CORRECTIONS: tr DISAPPROVED tr REINSPECTION REQUIRED DATE INSPECTOR r, . r--l*-,.lrl+q.lrq- tNs * PEcTION REQUEST TO)A/N OF VAIL I ./ *'' -KPr\ AM ER OF ROJECT a iNspecrroru: o JoB NAMEDATE READY FOR LOCATION: THUR FRI U 9Tt Innenoveo CORRECTIONS: tr DISAPPROVED tr REINSPECTION REQUIRED BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERFROUND '-.'o noucn 7p.w.v. tr RO,FJGH / WATER tr FOUNDATION / STEEL O FRAMING - ROOF & SHEERu pLvwooD ilRttruc tr GAS PIPING , tr INSULATION tr SHEETROCK NAI tr FINAL tr FINAL "" MECHANICAL: O HEATING tr EXHAUST HOODS tr SUPPLY AIR \ , - - /-1 ^\DAIE / ('J-V) lNSPEcroR rNsilc'oN REeuEsr TOWN OF VSIL t CALLER READY FOR INSP LOCATION: FRI i APPROVED tr DISAPPROVED O REINSPECTION REQUIRED BUILDING: O FOOTINGS / STEEL PLUMBING: tr UNDERGROUND D ROUGH / D.W.V.tr FOUNDATION / STEEL tr FRAMING I-1 ROOF &SHEER" PLYWOOD NAILING tr GAS PIPING tr INSULATION tr SHEETROCK tr ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR O FINAL COBBECT / t,z a*,/oete / -'/ (, - -z / tNSPEcroR td$sr*op L,'rcoa(.- .ALLER \, &( - TOWN OF rNstnoN REeuESr READY FOR locnTfoN: INSPECTION: a TUES WED h7L /..-.- I BUILDING: tr FOOTINGS / STEEL PLUMBING: tr FOUNDATION / STEEL tr ROUGH / D.W.V. )r{j- 6 rnnvrruc '"/frouea / wArER - ROOF & SHEER " PLYWooD NAILING K.cns PIPING 3a'y'-s;- I O INSULATION tr POOL / H, TUB EI SHEETROCK' NAIL tr tr trtr FINAL FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: O HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR tr tr FINAL tr tr FINAL }(nnenoveo CORRECTIONS: tr DISAPPROVED tr REINSPECTION REQUIRED D^rE o2 -/4 -?/ rNSpEcroR {1. ffisuop rr'"{ REQUEST V$lL + DATE READY FOR LOCATION: JOB NAME INSPECTION: BUILDING:PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER tr FOOTINGS / STEEL tr FOUNDATION / STEEL ,-\nooc LSHEEn- PLYWooD NATLTNG - o cAS PIPING TNSULATION SHEETROCK NAIL - tr FINAL MECHANICAL: tr TEMP. POWER O HEATING tr ROUGH tr EXHAUST HOODS tr CONDUIT O SUPPLY AIR ' tr FrNAt_ _tr FINAL fneenoveo CORRECI}ONS: tr DISAPPBOVED tr REINSPECTION BEQUIRED INSPECTOR I PECTIOrpwN _=/ /;ct t NUi d 7l ,o, ,uo*, 5{ PROJECT N REQUESToF V$lL I /ls:a' S tNs PERMIT DATE READY FOR INSPEC LOCATION: CALLER TUES THUR FRION:n{ BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND O ROUGH / D.W.V. tr ROUGH / WATER O FOUNDATION / STEEL tr FRAMING - ROOF & SHEERu PLYWooD NATLTNG tr GAS PIPING tr INSULATION tr SHEETROCK tr POOL / H. TUB tr FINAL MECHANICAL: O HEATING tr EXHAUST HOODS CONDUIT tr SUPPLY AIR FINAL FINAL APPROVED',-- -,1 D DISAPPROVED tr REINSPECTION REQUIRED CORRECTIONS: a,,''-)'? DATE INSPECTOR ,,.1. , , .,rF'i i,. . . ,.. .:r. q( --- lJ PERMIT NUMBER OF PROJECT rNslcnoNTOWN OF REQUEST V$lL a DATE READY FOR LOCATION: JOB NAME INSPECTION: Qz\ <' =/" BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER tr FOUNDATION / STEEL '2, \ O FRAMING r_.r ROOF & SHEER" PLYWOOD NAII tr GAS PIPING INSULATION SHEETROCK tr POOL / H, TUB tr tr tr NAIL tr tr oFINAL FINAL ELECTRICAL:MECHANICAL: g TEMP. fOWER O HEATING N ROUGH D EXHAUST HOODS tr CONDUIT tr SUPPLY AIR ,-q t-l tr FINAL E FINAL APPROVED CORRECTIONS: tr DISAPPROVED O REINSPECTION REQUIRED INSPECTOR niFsro" w<7 PERMIT NU 2a) MBEF OF PROJECT - - JOB NAME t INSPECTIONTOWN OF REQUESTv$rL ! DATE CALLER .'J'I READY FOR LOCATION: tr DISAPPROVED -.1 D REINSPECTION REQUIRED BUILDING: - D FOOTINGS / STEEL PLUMBING: O UNDERGROUND rjF tr ROUGH / D.W.V. tr ROUGH / WATER tr FqUNDATON / STEEL tr FRAMING ,- ROOF & SHEEB" PLYWOOD NAILING O GAS PIPING INSULATION SHEETROCK D POOL / H. TUB D ft tr NAIL tr tr oFINAL FINAL ELECTRICAL:-" tr TEMP. POWER MECHANICAL: O HEATING D ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR r-t tr FINAL tr tr FINAL Knppnoveo CORRECTIONS:l i' \ oo-, 3 -,f -,/y' rNSpEcroR '. PERMI DATE T NUMBER OF PROJECT 3-/'J -? /JOB NAME $fi.o-u=sn'ECTION TOWN OF ./.i;'.L/ v17t1t LER READY FOR LOCATION: INSPECTION:WED THUR FRI (- BUILDING: tr FOOTINGS tr FOUNDATI tr FRAMING / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER ON i STEEL - ROOF & SHEEB" PLYWOOD NAILING tr GAS PIPING tr INSULATION tr POOL / H. TUB trSH OCK NAIL o tr o tr tr NAL FINAL ELECTRICAL: tr TEMP. POWER MECHANICAL: O HEATING tr ROUGH o n tr tr EXHAUST HOODS tr CONDUIT SUPPLY IAIR tr tr FINAL FINAL SfAPPRovED tr DISAPPROVED tr REINSPECTION REQUIRED CORRECTIONS; Bfii*or DATE INSPECTOR T NUMBER OF PROJECT 3 /2 7 / JoB NAME rNs t PECTION TOWN OFPERMI DATE Lt. CALLER \l l'i ,' | - REQUEST v,$L . '/'2 READY FOR LOCATION: INSPECTION:l d)') //t:\\ ( lTUES (WED) THUR , \1_-..2 ../-v:iT /,-' FRI BUILDING: D FOOTINGS / STEEL PL tr tr tr tr D tr O UMBING: tr FOUNDATION / STEEL UNDERGROUND ROUGH / D.W.V. ROUGH / WATERD FRAMING ,_ ROOF & SHEER" PLYWOOD NAILING GAS PIPING O INSULATION POOL / H. TUB ( tr SHEETROCK NAIL O FINAL tr FINAL $LECTRICAL: tr TEMP. POWER MECHANICAL: tr HEATING tr ROUGH tr EXHAUST HOODS o tr CONDUIT D SUPPLY AIR tr FINAL tr FINAL APPROVED CORRECTIONS: tr DISAPPROVED O REINSPECTION REQUIREO INSPECTOR ' ';lr) ^4 w* J-- P4//- INSPECTION REQUEST PERMIT NU DATE READY FOR LOCATION: CT ro\ryry^oF V,glL .r JOB NAME INSPECTION: CALL TUES AM <JJC @ BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. N ROUGH / WATER tr FOUNDATION / STEEL D FRAMING ROOF & SHEER PLYWOOD NAILING tr GAS PIPING INSULATION D POOL / H. TUB tr SHEETROCK NAIL tr FINAL tr FINAL ELECTRICAL:MECHANICAL: tr HEATING O ROUGH D EXHAUST HOODS E CONDUIT tr SUPPLY AIR tr FINAL tr APPROVED CORRECTIONS: DISAPPROVED REINSPECTION REOUIRED li.t ''-'----,- sa16 ,5- ' -" !" - ,?/ rNspEcroR /< -'l^ti- PERMIT NUMB DATE READY FOR LOCATION: OF PR JECT INSPECTION: JOB NAME INSPECTIONTOWN OF 6---/ REOUEST VAIL r CALLER TUES o"o BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. EI ROUGH / WATER tr FOUNDATION / STEEL tr FRAMING - ROOF & SHEER" PLYWOOD NAILING tr GAS PIPING tr INSULATION tr POOL / H. TUB tr FINAL tr FINAL MECHANICAL: D HEATING tr EXHAUST HOODS CONDUIT tr SUPPLY AIR O FINAL tr FINAL APPROVED CORRECTIONS: O DISAPPROVED tr REINSPECTION REQUIRED l! ; .f .-r r - ?/DATE INSPECTOR ONNOFrl W Toc T( trNs rl T NUMBER OF PROJECT REQUEST V4'lL q (/ ( -?r JOB NAME {+./ L4- CALLER TUES.: WE UR (Jatr {@READY FOR LOCATION: INSPECTION: 0: AM PERt\4 | .--,., vbtt:/n la1 , BUILDING:PLUMBING: tr UNDERGROUND O ROUGH i D.W.V. O ROUGH / WATER D o o tr tl tr tr FOOTINGS / STEEL FOUNDATION / STEEL FRAMING ROOF & SHEER ' PLYWOOD NAILING tr GAS PIPING INSULATION D POOL i H, TUB SHEETROCK NAIL tr E tr FINAL tr FINAL ELECTRIGAL: O TEMP. POWER MECHANICAL: tr HEATING tr tr D ROUGH tr EXHAUST HOODS CONDUIT D SUPPLY AIR drrrunl tr FINAL AppRovED '4..14-r'Oe, 9n& tr DTSAPPROVED tr REINSPECTION REQUIRED CORRECTIONS: DATE INSPECTOR rNs -PECTI TOW o REQUESTF VAIL,{JECT JOB NAME .READY FOR INSPECTION: rocAlfoN: CALLER TUES WED AM 6il\----' BUILDING: tr FOOTINGS / STEEL PLUMBING: D UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER O FOUNDATION / STEEL r-r ROOF d'SHeen" PLYWOOD NAILING tr GAS PIPING tr INSULATION tr SFIEETROCK tr POOL / H. TUB FINAL tr ,tr tr tr tr HEATING ROUGH, tr SUPPLY AIR tr FINAL tr APPROVED , CORRECTIONS: tr DISAPPROVED EINSPECTION REOUIRED I dnre,tQ INSPECTOR Pnlkgro" rnsilctoN REeuEsr TOWN OF V+tL r JOB NAME CALLER READY FOR LOCATION: BUILDING: tr FOOTINGS / STEEL PLUMBING: D UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER D FOUNDATION / STEEL O FRAMING fr ROOF & SHEER" PLYWOOD NAILING tr GAS PIPING f] INSULATION tr POOL / H. TUB tr SHEETROCK NAIL tr trtr. rnet TID DFINAL ELE trT trF trc tr_ CTRICAL:MECHANICAL: TEMP. POWER tr HEATING ROUGH tr EXHAUST HOODS CONDUIT tr SUPPLY AIR tr FINAL tr FINAL APPROVED tr DISAPPROVED tr REINSPECTION REQUIRED RRECTIONS: INSPECTOR s'fris'oe ,y fug1ltn'a,fr D^ S INSPECTION REQUEST TOWN vf\rL -r CALLER FRI PERMIT DATE READY FOR INSPECTIO LOCATION: JOB NAME MON T d O DISAPPROVED tr REINSPECTION REQUIREDAPPROVED CORHECTIONS: UMB BUILDING: tr FOOTINGS / STEEL PLUMBING: D UNDERGROUND tr ROUGH i o.fr1.v.tr FOUNDATION / STEEL tr FRAMING tr ROUGH / WATER ,- ROOF & SHEER " pLVwooo NAtLtNG ' ':tr GAS PIPING tr POOL / H. TUB SHEETROCK NAIL trFlNAL [ trFlNAL+ ELEGTRICAL:MECHANICAL: tr TEMP. POWER I E HEATING C ROUGH tr CONDUIT \,SUPPLY AIR El FINAL oor, /- // - /r rNSpEcroR * INSPECTIO N REQUEST PERMIT NUMBE OF PROJECT r)- TOWN ty'r^ -/'F DATE READY FOR INSPECTION: LOCATION: JOB NAME CALLER TUES THUR FRI { \$\ { I.,I T \ U > .tr{ APPROVED CORRECTIONS: O DISAPPROVED tr REINSPECTION REQUIRED BUILDING: tr FOOTINGS / STEEL PLUMBING: tr UNDERGROUND tr ROUGH / D.W.V. tr ROUGH / WATER tr FOUNDATIOIi / STEE- 1*. _ ROOF & SHEER" PLYWOOD NAILING D GAS PIPING O INSULATION tr POOL / H. TUB wet (,0' trFrNAL ELECTRICAL: tr TEMP. POWER MECHANICAL: D HEATING -O ROUGH tr EXHAUST HOODS tr CONDUIT tr SUPPLY AIR O FINAL O FINAL $L:; q-/n- fZ ,NSPEcroR niiFs.op f* tottrcrroN's couPLETEx) The ltens belos need to be conplete before glvLng a perult a flnal C of 0. Please check off la the box provlded. FINAT PLI'}EING tr FI,NAL I.{ECEANICAI, IMPROVEMENT SURVEY OK RESID. NAl,rE: CCC;SAIN FINAL ELECTRICAT I FINAL BUILDING EAST SIDE:$EST SIDE: DATE: TEilPOMRY C OF O CERTITICATE OF OCCIIPANCY ,*", a -/ f,4/ \d.\a-41"-x\ -o(, Kz*en*J ,6,t2,1 | 7J Soutb Frontage Road Vail, Colorado 81657 t0t -47 9-2 1 t 8 / FAX t03 -47 9 -2 1 66 Department of Pahlic Works/Transportnti0n nm'n - la '\ltlu - ' -u')Jt MEMORANDUM TO: FROM: DATE: RE: n:"";:lik 2>11, July 4, L99L Cerasola Residence Certj-ficate of Occupancy 805 Potato Patch Before PubLic Works will sign off on the Certificate of Occupancy,the guardrail on the eastern end of the project will need to beextended to the west to close the gap between the end of theguardrail and their entry feature. The end section of theguardrail will need to be a Type 3E end section. A detail of thisend section is enclosed. The rest of the guardrail will need to conforrn to the highlighteddetail regarding shoulder treatrnents withou! curb. There is a section of shoulder about 50 r - j-00 r west of the entrythat needs to be brought back up. The sections of guardrail with concrete on them need to be cleanedor replaced. rf you have any questions, please contact myself or pete Burnett. GHlsIh cc: Pete BurnettCharlie Davis Jirn HozaCharlie Overend : F lr,I2 o a EIIIg{ att. al I h iuili' Irl*l (, =(, Cttt boo. G lrJFz lrJ(J P EtdF2rrl(, J t 52 al tl, 1 I 1 T J ;n E e lrlctaE( il' iti Hl' a?r! i5ITFTZaLliE *r,r J!E E( o t I I ![ :l fu t B I JJt fri ll * II I I a t tsi II tt aI i8 b9 rig= z7 N t too(o \ ot az F U1 i I \ II\ ti ir I t It It I I * ! ttdd x E{ t! I lliI ! Is { I !I ! E T Irbl:r iE IE ElrJ En t t I It Ia I!d 5a(,a lrlF lr,lc(J2o(t ,rl II I B I t t ! at I E $ t I I R I! i[irl tI| px $ oo OO I=BECKI I iND ASSOCTaTES, 'NC.ilr July 17, 1990 Town of Vail Departrnent of Public Works 75 So. Frontage Rd.Vail , CO aL657 Attn: Greg HalI Dear Greg, I wanted to take a monent to update you on the status of theCerisola project. on July l-1-, I received word from Steve Pawlak of Chen Northern that he could not recommend full height slot cutting to accommodate the installation of the retaining wall at the north side of the driveway. In light of this inforrnation we have decided to pursue the following alternative course: l-. Apply to Town of VaiI for variance to allow sinqle retaining waLls at both sides of the driveway in lieu of tiered walls. 2. Install a pernanent reinforced concrete slab and tieback retaining wall system at the north side of the driveway.This system would be installed as two slightly offset horizontal walls that Steve Pawlak said he could approve. The slabs would be back-tied approximately 40 ft. under the road with permanent epoxy-grouted tiebacks sinilar to what is being used in Glenwood Canyon. 3. Install a secondary waII of Retention Engineering Keystoneblock in front of the concrete tieback wall. The Keystone block would be for aesthetic purposes only. 4. Install a conplete Retention Engineering Keystone block andgeogrid system at the south side of the driveway. GEII'EP'I CO'{TFACTOFS P.O. AOX 4030 vatL, coLoBADo a165a 1303194+laax) oo o3r Greg Hall T.O.V. Dept. of Public Works 7 /L7 /eoPage 2 If we pursue this alternative course of action and can provide adequate engineering information I am assuning that you will approve this installation. If this course of action j-s sonethingyou feel you cannot approve please inform me A.S.A.P. since we pJ-an on beginning engineering work on Thursday, July 19. call ure if you have any questions regarding our plan. Yt FranLPaynevice President Beck and Associates, Inc. I.P/l<h copy: c.N.A. Consulting Engineers Pan Hopkins Gary Murrain July 2, 1990 Mr. Greg Hall, P.E. Town of VaiI 75 S. Frontage RoadVail, Colorado 81657 Re: Retaining }lalI Review Cerisola ResidenceLot 29, Block 1, Potato Patch Dear Mr. Hall: At the request of your office, GNA has reviewed thecalculations for the above referenced project for compliance withthe geotechnical reconunendations provided by Chen-Northern, Inc.. The following is a summary of that cursory review of this project and reconunendations for future submittals. t. The Retention Engineering (RE) calculations indicated a1.5 to I slope above the walI. The Chen-Northern reportallowed for a maximum slope of 2 to l. By scaling on theplan drawing, the topographic information indicated a Ito l slope. This could reguire that a 17 foot wall is required inEtead of the 14 foot wal1 proposed. 2. The RE calculations indicated a coefficient of frictionof 0.6 was used in calculating the factor of safetyagainst sliding. The geotechnical report allows for a value of 0.45. 3. The RE calcs used an equivalent fluid pressure of 38 pcf. The report reconunends a value of 40 pcf. 4. lhe RE calcs showed a Eoil bearing pressure of 3062 psf. The report allows a pressure of 2500 psf. 5. cNA talked with llr. Steve Pawlik of Chen-Northern concerning the possibility of temporarily cutting a slope steeper than I to 1 for the construstion of the proposed retaining wall system. He indicated that the slope night be able to stand, but that the OSHA limit was a I to I slope without shoring. 6. Since RE did not submit a cross-section of the proposedwall at its maximum height, GNA was unable to perform an analysis of the system proposed. I{e reeonunend that the Town of Vail require RE to resubmit the design with the values indicated in the geotechnisal report. l{e further 9034 East Easter Place. Suite 105. Fnglewd, Colorado 80112 o (303) 290{170 Town of Vail GNA, fnc. JuIy 2, 1990 Page 2 reconunend that the nen calculation contain a diagram andcross-section of the proposed retaining lraII system. This will aid in an independent anallzsis and review ofthe system. In sunmary, since there were so many obvious discrepancies betweenthe calculations and the geotechnical report, cNA reconunends thata detailed get of caleulations be reguired to be submitted for review by the town of Vail. If you should have any guestions concerning this report, orif I nay be of further assistance to you, Blease call me. Sincerel y. James M. Nolan, P.E. PrinciDaI cc. file + 3qr.n.p 2o) U.tJ l,-7zr b4o wgl / = v,1'(r,a'{)(rr; ) -- l \,?-* q z .1+t,L Z r?'1 Yh{ Gv 2.s X,/ f ?-'toTvut{ oo Y,3, .l YAs oo z(e7al kz xl--N LZI\,D\ alo h\u W\l+ 2bo4,3t (+'n s4'r)'F 1711'oL( 55q { z- Vhq I, totl oo 90002 f'o 'NolDNrt|svM' \.N 3nN]AV x8()A AllN Sfll 9i6L lsn)nv. N()lllol tilNllrSlHl . NOlr)n8tSNOf lol oo 'srflr.tH)uY lo llnlllsNl NVllllRV lHl -t)vUINO) lHl JO SNOIIIONOI lvulNlt . . 9l6t O. oVlV t0zv lNlwnfoo YIY 9t6t-LOZV 81 't € tldclBtled qll/t afueploJ)p ul l! lla::o) Aeu rouair6l aql 'z'Z €l pue I e'el 'L'g ' sqdeJBeredqn5 ur papr,rord se IroM Suttlro;uo: -uou ro aArl)aJap lfarrol ol slleJ rolluluol aql Jl t'z'tl 'lauA\o aql Aq panrrm s! lP^otrtar ssalun 'Z'Z'€[ puu L'Z'tL '! S't sqdelSeredqn5 Japun pallarlol uaaq lou a^Pq qllLl/v\ PUP 3u rLtuoruof -uou Jo a^tl)araP ale q)lq/!\ l.,oM aql Jo suoll -rod 11e ayrs aql uroJ, a,\ouleJ lleqs lol)Plluo3 aql g'Z'tl 'uolllpuo) aql fo Ala^o)slp laue Altdruord afrtou qfns a,tt8 1;eqs rau^\O aql 'l)elluoJ aql ,o uorlpurtlral oArArns 1;eqs uotteBr;qo sltll 'uorl -rpuoJ q)ns;o a:ueldat:e uall!J^\ P lol)?rluol aql ua^13 Alsnorna.rd seq rau,,\ O aql ssalun os op ol Jau^lo aql uJol, alrlou ual1.l^\ P ro ldlalal tat;e ,(lldtuold lt lf,aJJo) lleqs lolf,erluo] orll'sluaLunloc l)ejluo] eql qt!^r a)uepJof)P u! lou Jo a^lllalap aq ol punoj st lloM eql Jo AuP',sluau.l -n)oC l)prluo3 eqt Aq parrnbar Aluelreal ;cr:ads a;qer -rldde Aue Jo srliat aqt Aq ro ^ El Aq paqurserd aq Aeul se aurl ,o pouad ra8uo1 t{)ns uttllt^ lo tuauldrnba palPu -8rsap;o Jau^1O at{l Aq aruelda::e ra11e leaA auo ulLlll/r,r lo loaraql uorl.rod paleu8tsap lo IloM aql ,o uollalduio1 lprluetsqns ro atpc eql rolrE ree^ euo ulqll^\ 'rl Z'Z'f,1 'Aqeleql AJPssaf,au epeu sef,rAres leuorlrppe s,lratrqrrv aql to1 uottesuaduo: Surpnlrur '1.ro1i1 palrelar q:ns 3ut1:artoryo slsol lle JPaq llPrls .lotle.lluo] aql 'patalduor ro pallPlsul 'pale)uq?, lou Jo Jaqlaq/!\ pue uor1a1dr"uo1 lsttuelsqns reUP io eloJ -aq paruasqo raqlaq^\ stueurnfoo l)erluo] aql ol ulloj -uor o1 8ur;re; sp ro a^rl)e;ep t.,.?gpfgv aql Iq patlalar lJoA lle lrerror ^lldtuord lleqi ,dtlErtuol aqt f'Z'el xuol lo Notlf,luxo) z'tL 'slsor qfns ,o luatuAPd aql ro, alqrsuodsar aq lleqs reu^\O aql lua^a q)tq^\ ut'9 alftuv ur papraord se rol)srluo) aleredas p Jo Jau^io aqt Aq pasnptr se^\ uolllpuor stqt leqt Puno, eq l! ssalun slsof, q>ns Aed lleqs rollsrluo] aql istuaurn)oo tfelluo] oql qlr^ efuepJofle ur lou Puno, aq lro^ qlns ,| 'lau^\o aql ol peBrpq) eq 'rapro a8ueq3 alerrdordde i(q'lleqs tueu -a:e;da: pue Supraaorun ,o lsof aql 'sluau:n)o6 l)Erluo1 eql qlr^ a)uEprof,)e ur puno] aq lJoM q)ns ,l 'lol)ell -uo] aqt Iq pera^o)un aq llBqs l! pup lroM qfns aas oI fsanbar Aeur nW aql .ipara^o) Eutaq o1 rorrd anras -qo ot pelsanDar ^lle)rrrf aos tou seq 5'*El? aql q)rq/vr para^of uaaq sPq {roM aql Jo uoruoo raqlo AUP I z'l'tt 'asuadxa s,rol)prluoJ aql le pe)pldar aq lleqs pup uortetuasqo srt{ ro, para^o)un aq 'fl3ffiV aqt Iq Surtu^r.uq parlnbar 1; tsnur 1r'sluaun:of 'tiertio3 aqt ur passardxa ,(;1er11trads sluauarrnbar ol lo *BtH;1rF ar{t ,o tsenbar aql ot tuprl -uol para^or aq pln6i{slropl aqt ,o uoluod Aue l'l'tl )luo A,o 9Nrul^of,Nn I'tl. )uol lo No|l)luuo) oNV 9NtuIAo)Nn 'rot)Prluo] aql puP lauA\o aql uo Sutputq aq lleqs Pue 'rapro uellrr/v\ Aq paltaga aq llPqs saEueqr qlnS 'sluauJ -nloc llelluo] aql ,o luJlul aql qllill lualslsuo)u! lou pue aull l)Plluo] aql Jo uolsualxa ue Jo ulns llelluo] aql ur luaulsnlpe ue Eutn;onut lou {roM aql u! sotuPt{) rourul rapro ol Aluoqtne a^PLl llt^'t rau/vro aql l't'Zl tuo/u rHl Nl sl9NvH) UONIW t'zl '!'€'ZI qdet8etedqnS ur papt,rold se ulelf, qf,ns aleul llerls rotrerluol aql 'l'6 qdet8ete4 ol luenslnd rau/v\O eqf Aq fuau^ed ,o arnlrej (il )o 't'ZL qderSeted ol luens -rnd pansst {JoM aql ut eSuPtl) lou!ut e Jo} laPlo uallllA\ AuP (€)'llns, le lou se^\ .,ol)eJluol aql eiaqM 5'6 qderS -Ered ot tuensrnd ryoM aql dols ol laum6 aql Aq lapro Aue 171 'g'7'7 qdetgPledqnS o1 luenstnd uollelardJalul ualtu^ iue (f) 'ol petlurll tou lnq 'Jo asnP)aq pa^lo^ -ur st lsol lPuor Ppe leql su ell lollPrluo] aql ,l z'g'zl 'iaprO eEuPtlf ,{c1 pazttoqtne aq lleqs urrel) t{)ns uror} 8u;tlnsar urns t)Prluol aqt ut e8uPt{) AUV e +3€t!![,lV eql Aq pauturalap oq lleqs l! 'urns l)Prluo] aql /- ufT6ilrsnlpe aql ,o lunoure aql uo aer8e louue) Iollerl -uol aql PUP reu^lo aq.l ,l 'apetu os ssalun plle^ aq lleqs mrPl) qf,ns oN '€'01 t{d€rEPled ql!A\ a)uPprol)e ul paef -ord ;;eqs .rolf,Ertuo1 aqt ase) qltq,lr ut Atrado:d ro a1t1 tuuaSuepue buatraura up ur lderxa 'ltoM eql alnfaxa o1 Surpaarord aroraq rotreiluo3 agt Iq uantB aq ;1eqs ef,rlou srql 'turell q)ns o1 astr Eutnt8 lue^e aql ro a)ueJ -Jnf,)o aql Jaup sABp ^luai\ l utrlltir^ JoaJaqt a)tlou ualllr/i 49uH?3r aql aatS llPt{s eq ',tuns lf,erluo] eql ur asear)ul -ug lo, urel) e eleur ol seqsr^l rolfPrluol aql ,l l'g'zt lso) lvNollroov uoj swlwl t'al 'suo!t!puo) aql Jo aJus^lesqo lsJU aql JalrE slep ^lua^\l ulqll^\ apeu Al:ed raqlla Aq urpl) uodn repro etuei{l Aq patsnl -pe Alqetlnba eq lleqs ulns tf,ertuo3 eqt 'paratuno)ue aq 'llerluo] srql u! Jo, paprao.,d rel)elEqf, aql ,o Ilo/!\ ul luaraqur se pazruSo)ar ,{;;elauaS pue paraluno)ua Ilusu -rpro asoql tro.r; i(1geualer,u Eurragrp'arnlpu lensnun up ro alnlrnrls Eullsrxa ue ur suorypuoJ u/v\oulun Jo palga)uo) plnoqs ro punor8 agt ro aJerins eqt aolaq suollpuor letrsft{d ulroulun plnoqs ro 'slueunf,o6 l)Brluo) aql Aq Palef,rpur suorlrpuof aql qllA\ af,uBlreA lE aq alnlf,nrls Sutlsrxa ue ur suorlrpuof, umou{un ro palpef,uo) plnoqs Jo punort aqt ,o e)errns aql ^\oleq ryoM eql ,o atrueurolad aql u! paraluno)ua suorlPuol pelea)uol Plnoqs l'z'zl sNollloNof, oTryllJNol a'z| 'pelsntpe Alqelrnba eq llEqs serrrd llun alqelrldde aqt 'lolrprluolr aql ro .rau^ro aql ol ^lnbe-u! lenuplsqns asne) lp^A pesodord {106 ,o sartnupnb atll ol sarlrd llun paaJte aqt ,o uoltP)lldde 1eq1 :aprg atueq3 pasodord e ur patueqr os are paleldualuot A;1eur -Brro sartrtuenb aql ,! pu? 'uodn paarBe ,{lluanbasqns .ro sluauJnf,oo l)pJtuo) eql ul pelels arp seJud l!un rt g'l'Zl 'atueql leql o1 lradsar qlrlr '^ue rr 'es?ar)ur teu aql ,o srspq aql uo peln8u aq ll?qs tlrord puE p?aqre^o ro, af,ue^rolle eqt 'atueqt auo,(ue u! pa^lo^U! ars suorlnlllsqns ro ryoM palelar tuFa^ol slrparf, pue suolyppe r{loq ueqM ' Wg aql Iq peuru -uo) se lso lau lEnlle eql ,o lrrlToruP aql aq llt^r uns ItrBlluo1 eql u! asear)ep leu p ur sllnsa: qf,rqr aSueqr ro tt rlf,truv 'Andutotd sJepjo ualllJA\ q)ns lno fujEf, llprls ,ol)Ejluo] aql oo /= z9 al y', -a-' B"eJE t,lof/ = 33.b?' fqn,t -t€ lb' I ++t '?n#u'ru Cb.SLci - ,b€8 k *tr:,i ,(rt ,bt f.uvtt' = 41on (,\) k X t-txz 4,'Uu') tt,.2 53q4 tots.of, ," --"p>*L?bsis.Lt+ ffi ** sc|.2 s4,3 =t;J'X ' Js g ="1.5i31 /= 4.vp trf oO n€ bff+3 \4tbl?''B @o trot 24,g2a2, t3 (z z{ 6=' 3.1 cote- eo*a oo er6!-rceY ffi,,i,%,i9i,'dlffi:T,.Si#l:'iL'1330'$'$"'& l?iilj8jiji,rl-'Biil[$E'1ffi-i3i i#i8"'nS[ '* oo IJ uollelap Aue to1 tau,r'rg.ot{l ol loll?Jluo1 aq ,(q Pa^\olls rq ol llpeD ,o lunourE aql 'luaur^ed ro, elellr.llie) tttel s,"Ona :$tarV aql uo apBut aq lleqs lunol)e uo slueul^Pd 'JaulAO ' a.{l ol lsof ,o uorleululrslaP ;eut1 tutpuad 'atuei.l) aql.ol alie1nqrr11e-r(gttartp lauuosrad alrrJo plaU pue uolsrruadns ,o slso) lsuo!l!ppe aql puE jllaulq)Eu pue luautdtnba io an;en lb1uar 1sulnru.ra.,d Puoq ief,uernsul u-otlesuaduro: i,uaut1o,^'r lo, allo/rl lulolsnl to luauaa:8e Aq PeJlnb -ar s1rlauaq a8ut4 pue 'aluelnsul luauAoldtuaun pue atu p;o'Atrnres;etlos Surpnput 'JoqPl ,o lsoJ 1tua^lleP ,o lsol pue x?l sales 8urpn;ru1 'slslralsul 1o lsor:Sutalo; -lo, aql ol pallull aq llEqs lso) 'sluaunroo llErluo] aql u1 papl,rord asl^ iaqlo ssalun 'lapro aSuPqJ B u! uols -ri$ur'io1 elep Suruoddns aleudordde qt!^r raqlaSol 8u! -r"",l:x':,i;ill?' J;"'"Ji'"';"i.1,f ffi :ll' ##l t'€'L'z! puP €'€'L'zL sasnPlf lapun oslE pus'asetr qf,ns ul '111o:d pue peeqla^o ro, aluemolle alqPuosPal e'uns l)eJl -uof eql ut asPaJf,ut ue ro esP) aqt ur'Sutpnpul'atuPq) eql ol elqplnqull€ {106 aqt Sulurro;rad asoqt 1o stulnes pue sarnltpuadxa elqeuoseal ai{t ,o slsEq aql uo l)allq)iv eql Aq Peurulralap aq uaql lleqs IroM q)ns ,o lsol aql 'pe^lo^u! ItoA aql qlr,rir paarord A;tdtuotd llPqs lau^\o aqt ,{q pauSrs rapro uellll^l E se^laJal eq Papt^old 'Jol -f,Erluol eqt 'uodn paaiEe st E t'L'ZL )o Z'E L'ZL'L'e'L'ZL sesnel] ur qlrol las sPoqlaur aql ,o auou tl l'L'zl '9'1-'7; qde.rSeredqn5 ur papr,rord PorilauJ aqt Aq 9' ro 1ea, ateluaf,lad ro poxu alqetdat:e ,(;;entnru e pue sarlred aqt Aq uodn paelSe rauueur P ut PeutullataP aq o1 tsor Aq t' I uodn paart9,(ltuanbasqns io sluaurnloc l)stluoJ aql ul Palels sarud ltun Aq 1' luollenle^a lluitad ol Plep Surlerluelsqns luaorrrns Iq pauoddns Pue pazruJall Apado:d trns dtunl e 1o atueldatre 1en1nu (q !' :s^e^\ Surn ollo, aql ,o eioul Jo auo ul pautuJralaP aq lleqs IloM aql ut atueqr e uro:;8url;nsal JaU^1O aqt ot llPelt lo lso) eql f,'l'Zl 'quaul -nfoo l)e.tluo) eql ,o suotltpuo) alqe)tldde aql lapun pauro;rad aq llpr.ls pue'rapro a8ueq3r Aq Pazuoqlns eq lleqs {106 aqt u1 saSueq: qrns llV'I;tutproree palsnIPE Suraq aulrl lf,erluo) aql puE uins lf,eJluo) aql 'suolsl^al raqlo ro suorlalap 'suotlrppe ;o Sutlsrsuor llPlluo3 aql 1o ado:s ;etaua8 aql urtllr^\ IroM aqt ur saSueqr raplo Ieu'1re:1uo1 eql Surleptlp^ur lnoqlti\ 'rau^lo aql Z'1'Zt 'auir1 lrerluo3l aqr JO lxns lJetluotr aql u! luaulsnlpe aqt Sutpn;lut 'qtt,trt -a:aql luauraerSe stq seleltput lol)E:luo) aql Aq pau8ts .raprg a8ueqS V 'raprg a8ueq3 {g l;uo pa8uegt aq Aeu aturl l)eJtuol eql pue uns tf,prluo] aql 'autl tJerl -uo] aql ro uns llEtluol aqt ur luauttsn[pP uE Jo l.roM aql ur aSueqr p Surzuoqlne 'tJeJtuo1 eql ,o uotln)axe ,alre penssr /t)a+5p.tv-€ql-"{rt rauA\O aqt lq pautts to1 -)?Jluo3 eql ol repro uelltJl\ e st lapr6 a8ueq3 y 1'1'71 sulouo rgNvl{f L'ZL ,uo/$ rHl Nt stDNvl{) '9'1; qderBete4 slqt repun atuErnsu! iq pare^or tualxa aql ol 'Pasnef, raaamoq sp.tPzEq Jaqlo Jo alu ol enP sassol letluanbes -uor 8ugpn;ru; 'Aredo.td srq lo asn ,o ssol ro, rollerluo3 aql lsuge8e uo$Je ro slq8u 11e se^lelrr JauA\O aql'Pasne) :aia,noq 'sprszpq .teqlo ro alq ol anP llradotd stq;o esn ,o ssol lsule8e urtq aJnsur llrl\ sP a)u?Jnsu! qJns ulel -ureu pup aseqrrnd i(eu'uotldo slq lP 'leu^Ag aql l't'll rf,NvunsNl $n lo ssor t'll 'plar{r1l!/r^ A;geuosearun aq lou lleqs asn lo Aluedn:ro q)ns ol sarueduol Jo lueduof, a)ueJnsu! aql Jo pue Jottrerluo1 aql ,o luasuo1 asn Jo ^:uednrlo ;erlred qlns ,o lunof,)e uo pesdEl ro pallatruef, aq lou lleqs a)uerns -u! slql 'saDlloct ro brlod aql ol tuaurasropue Aq patuas -uo) eneq atrueJnsu! Aradord aqt Sutptnotd satuedulol lo Auedtuo: aJueJnsu! aql q)!q/\ ol pup tolf,eJluol pue Jeu^\o aql ,(q o1 paa:te l11en1nu eujll e ol :o1rd aruatn - u,ro) lou llpqs asn ro Aluednrro qlns 'roalaql uoltald -rrJol lertuqsqn5 o1 .ro1.rd ryoM eqt ;o suollrod Jo uoluod e asn ,o ^dnlf,o ol rfuessareu l! sput, JauA\O aql ,l 6't'll 'uoltnqlilslP qf,ns lfallp lllA\ srolPrllqrP aql'Parlnb -ar s! uolleruq.re Aq spaaroid af,uPlnsu! eql ,o uollnqul -slp ,l 'srolErlrqre q)ns lo suoll)allp eqt ql!/\ e)uePlo)f,e ur srarnsur aql qlli\ luaulelllas a{eu 'ase) leql ul 'll?qs ealsnrl se Jau^\O eql '6'7 qdet8ete4 ur papr,ro.rd se uasoql aq llpqs srolerlrqre 'apeur aq uotlrafqo qlns rt pue'ra^rod s!r{l ,o esDJaxa s,rau^^o aql ol ssol ,o a)ualjn)ro aql Jalre s{ep anrl u!r{l!it\ 8u!t!r^\ ut lralqo llet{s lsaratul ur satlred eql ,o auo ssalun siarnsur aql qllir\ ssol ^us aluas pu€ lsnlpe ol ialr^od a^eq lleqs ealsnrl se rau^ O aql 8'g'fl ':apr6 e8ueg3 ale -udordde u? Aq para^o) eq lleqs lro^ pa8euep,o luau.r -are1da.r 'apeur sr luauaar8e ;errads :aqlo ou ssol qlns )aqe '6'l qderte:e; ut paptnord se aq llEqs a:nparo:d eql esef, q)tq/!\ ut uollPlllqJP Aq plP^rs uP tllt/r^ e)uPPJo) -f,e ur Jo'qreai r(eu lsalalur ur sarlred aql se luauaarte t{rns ql!/lA ef,uepjo))e ur lr elnqulsrp lleqs aq puP'Pe^ral -ar os Aauour lue lunorre ale.ledas e ur lrsodap lleqs aH 'sannp srq 1o erueurropad .radord aql ro, puoq e^r8'ssol palnsu! u? ,o a)uarn)ro aqt uodn lleqs aalsnrl se JaUMO aql 'lsarelu! ut i(yed lue Aq tutlun ut partnbar 1 l't'll '9'€'LL qde:Setedqng stqt u! Paleraulnua salusd laqlo lle ro.loAP, ul qtrea sJaAle relurrs 'AIprlen ro; parrnbar l11e8a; araqm ualluA\ 'fluaLuaarte aleudord -de ,(q srolrerluofqns-qns pue srolf,erluo)qns 'sjotlpjl -uo: aleredas 'l)alrq)rv aql ,o arnbar;;eqs'aleudordde sp 'rol)srluol eqt ro reu^\O eql'g'gt'' ridsrteJpdqns iq pasodtur Iylrqsrl aqt ol pualxa tou lleqs saaAo;dura pue slua8e srq 't)elrqtrlv eql paproJJe .tanre,lir Suro8a.rol aq1 'aalsnrl se raul O eql Aq platl aruprnsur r.{)ns Jo spaa) -ord aqt o1 aneq ,{eu ,(aql se stqSrr qrns lderxa 'ryo41 aql ot a;qerr;dde aluernsur {lradord :aq1o i(ue ro g'11 qde:8e:e; s14l ol luensrnd paurelqo eruelnsur ,(q pareaor lualxa aqt ol srrad raqto ro art Aq pasnpt sageulep rol 'saar(ogdtue pue slua8e'sJol)eJluo)qns-qns'srolleJluo) -qns raql pu? 'Iup ,r 'srol)erluol aleredas pu? l)alrqlrv aqt (Z) pue 'raqlo aql ,o t{t?a saa,(o1dua pue slue8r 'sJolf,prluo)qns-qnS'srotlprluo)qnS aql pue raqlo qrea (!) lsuteSe slq8rr lle a^tel Jol)erluol pu? reu^\O eql 9't'!lzL ]l)!luv o 8311 We6l Crrdar Court Llttldon, CO tP125 3G!-791-1600 FAX 3fiF791-1710 1-8(x)-36ffiG6 Prolect l^r Pago: Locl.pn: v!,Dat6: Produot:By: Cll€nt:Choc*od: a jz il 2l 4 t_t ai I 'l -, la r.l a a;3 ,6 Y a t\I E '-{ r 2a ?t '*ql' c ): 1l --t .a D tfr .l ;t su-, 4 l---*t 't- I aZ i ?{ il I { l,.1 t) n v t )7 r t ,'/g-1.,I :l i (Y t +.i b 3E 'll,z_. I :i I r 2-I'T' Nonrelnlorcod Conorete Sewer, Culved A InbEdon Pip6 (12" thru 2f") Relntorced Concr€te Sewer, Culvert & lr.lgatlon Plp€ (12" thru 144") Relnforced Concr€b Elliptical Plpo (18" tirru 144') Pr€casl Concr€t€ Box Culvertg PrecaEt Three Sldcd Box Brldges Procast Concrrlo Msnholss Precest lnl6t3 and VaulL Preca3t R.tslnlng Wlll Procart Sound Brrrler Sp€clalty Precalt ltsmsCONCRETE FOR PERilANEilCE ! Chen€Northern,[nc. O 5080 Rosd | 54 Gledwood Spftngs. Colo(ado 8l60l 300945-7458 300 945-2363 Facsimile sttBsoll, s[tDY TOR FOTJNDACTOT{ DESIGN PROSED CERf,SOLA NESITEIICE r-r'r 29, Bt cK 1 POXAf,O PAtrCII \rAIL, @IORNIC 4 411 90 JITNE 22, 1990 PREPARED FOR, mcr( AND ASSCINTESIifIN: FRANK PAYNE P.O. D( 1413 \/AIL @ 8l-558-L413 a,rnmoe, ot tn.lEEilcrd$) or cdnpanies TABI,E OF @NIENIS @NCTIISIONS ItJRSE AIID S@EE OF SruDT PROPOSm @NSTTUCIION SITE @NDIIIOI{S EIELD EXPIORAfrTON stBsorl @NDrtrot{s FETJNDTfIIOI RE@[4I,I$IUT1o[IS FrcXjNMiITON AND REININIIG VBLI,S SITE GRADI}G FIooR SIABS I'NDERDRAIN SYSTSI STJRFACE ERAII.IAGE IJMNATTONS FIq,'RE ]- . IICA|ITON OF H(PTORATORY PIIS ETq,JRE 2 .IffS OF D(PTORATORY PrIS ETGT'Rts 3 . LffiEND AND TO.IES FIq,JRE 4 - GRADNIION IESf RESUfiNS TABLE I - S'IJIO4ARY OF IAMArcRY IEST REST'UXS t- 2 2 8 8 @[wrrsroDls Itre prcposed re-sidence sfiorld be fo.lrded with ryread footirgs bearfuq on tlrc rnbrral grranular soils ard designed for an allo,vable soif fearirg pressure of 25oO psf. Otlrer design ard constnrqtion criteria relatirg to geotectrrical aspects of tlre proposed Iresidence are preserrted in t}re body of ttrc reporb. PI,RPO8E AIID S@PE OF 8E['DY This report presents the re.suLts of a sulcsoil study for a proposed residence to be located on Lot 29. Block 1, Fotato Patch, Vail, Colorado. The project site is shcnm on Fig. 1-. The trrrrpose of ttre study was to develcp recomnerdations for tlre fourdation design. The study was corducted in accordanoe witJl our aqpeement for geotectrrical erqineerirq service-s to Becl< & Associates, dated June 4, LggO. Clren & A.ssociates, Inc. (ncw lcrcrun as Ctren- Norttrern, Inc.) previously corducted a feasiJcility sturty for I-oE 29, reported urder Job No. L6,455 ard dated July 3L, 1978. The results contained in that study were rqrierved in preparation for ttris report. A field erqrloration program consistirg of e>ploratory pits was corducted to obtain inforrnation on sulcsurface conditions. Sanples obtained durirg the field o<ploration were te-sted in ttre laboratory to deternine their ergineerirg ctraraeteristics. Ttre re.sults of tlre field oploration ard laboratory testi-rq were arnlyzed to denrelcp reconunerdations for for:rdation t14:es, depths ard allovable pressures for tlre pr"oposed tuildfuq forrdation. Ttre r.esults of the field elploration ard labor:atory testiry ar€ prcsent€d in the report. this :report has been pr.epar"ed to srmmrize ttre data obtained dr:rirq this sturty ard to present our conclusions ard reccnnerdations based on ttre proposed construstion ard tlre subsoil corditions enccunter"ed. Design paraneters ard a i ll.;: -2- discr:ssion of geotechnical ergineerirg considerations related to constmction of ttre proposed residence are included in ttre report. PrcK)SED @DTSMI'CTTON The prcposed nesidence will be a multiple lerrel wood fr:are structsure. Bottr clr-awl- s;nce ard slab-on-g::ade constnrstion will be used. Itre foturdation ard floor lerrels of ttre str.uctrrrre will be sb€Feed in sqrer:al levels ard crrt into ttre existing hiltside. C\rt depttrs are oeected to be in ttre mrge of 10 to L2 feet. We asstme relatively li$rt fourdation loadirrp, tlpical of the proposed type constnrction. If building loadirgs, location or gn:adirg plarrs drarrge sigrnificantly from those described above, r,tre strould be notified to reevaLuate ttre reconurenCations contained in this reporb. 8rIE @DIDTTTOI|g I-ot 29 is sitrrated on a st€ep to very steep, sorth facirg hillside direcLty belor Potato Patctr Drive. Slope gn:ades across tlre lot are typically about 5Ot. Abcut 20 feet in elenration dncp o<ists acL.oss tne buildirg site- At ttre tine of our field vrork, ttre prcrperty was vacant ard vegetated wittt native gnass€s ard r,rreeds. A ferrr scattered borl-ders were eryosed on the grourd surface. No clrrrious signs of slope instabirity r.ere seen on the lot. ,lr,,,i -3- EIEID EXPTORESTOT{ Itre field erq>loration for tlre project. uas corducted on June L, 1990. Two oplor:atory pits wel€ erccavated with a backtroe at tlrc locations shcmn on Fiq. L tp evaluate ttre subsr:rface corditions. lhe pits were logged by a representative of Ctpn-Nortlrern, Irr. Sanple-s of ttre subsoils were talcen with a z-inch I.D. hard driven sarpler. Disturlced bulk sanples Here also tal<en. Deptbs at vrtridr ttre sanples roere taken are shcnm on ttre Iogs of Dplo::atory Pits, Fig. 2. Itre sanples wete returned to our labo::atory for revier,rr bV the project ergireer ard testirq. ST,BTbIL @NDITToISS The sr:bsoil orditions encqrntered at tlre site are strorn graphically on Fig. 2. Ttre srrbsoils @nsist of L L/2 to 3 feet of topsoil overlying relatively dense, silty to clayey sandy g::avets containirg cobbles ard boulders. Iabor:atory testfug perforned on sarqlles obtai-ned fisn tlre pits irrcluded natural ncisb.r::e content, dr1 densities ard $:adation aralyses. Resul-ts of gr:adation arnlyses perforned on a bulk sanple talcen frcm Pit 1 of the natu::al coarse granular soils ar:e strovrn on Fig. 4. Itre laboratory testiry is sununarized in Table I. No free water was encountered il the pit-s at tlre tine ttrey were excavated ard the sr:bsoils were sligtrtly nrcist to npist. ' lt'll i i':i!r':rii',. -4- IOUNDASTOI REAHME{DASIqIIS Considerirg the subsoil corditions enco:ntered in tlre e4>loratory pits ard the natru:re of ttre prcposed constnrcbion, we recoNltnerd tfre hrildirq be fourded with spnead. foortirqs bearirg on tlre natural granular soils. The design ard constnrcbion sriteria prresented belcnr strould be obsewed for a qgread footfug fotndation system. Ttre constnrction criteria should be consider"ed wtren prelnrirq ploject. doo.uents. f-) Footirgs placed on the urdisturbed nattr::al g::anular soils sttoufd be desiqned for an allcnmble soil bearirq pressure of 2500 psf. Based on oqlerience, we e)1pecE setflenent of footi-rgs de-signed ard onstrusted as discussed il tfiis section will be about 1 inctr or less. 2') A1l o<istirg tcpsoit ard any loose or distrrrbed soils strould be rsncved ard ttre footirq beariry level er<terded doi.n to relatively dense natural granular soils. Itre etposed sufqrade sttculd be conpacted to at least 95? of stardard H:octor density in footirq bearirq aree6. 3) lhe footirgs strcnrld trave a ninilnnn width of 16 ilctres for continuous walls ard 2 feet for isolated Pads. 4) bcterior footirgs ard footirqs beneattr untreated aneas strould be provided wittr adequate soil cover aborre their bearirq elevation for frost protection. placsrent of fcurdations at least 48 inctres belour exterior grade is typically used in this area. 5) Contirruous forrdation walls strculd be reilforced top ard bottom to span an unsr.ported lerqth of at least 10 feet. Fotrdation walls actirg as retainirg stnrchrres stpuld also be designed to re.sist lateral earttt pressures as discrrssed in ttre trFardation ard Retainjrg Wallstr section of ttris relnrb. ! ;, ' I 6)A repl€sertative of tlre soil erqheer stpuld cbsente all footirg excavations prior to concrete placanent to evalr:ate bearfuq corditions. IOUNDErION At{D RTf,AII{IIG IBI.L8 Fourdation walls ard retainirg stnrcLr.u:es vrtridr are laterally supported and can be e>pected to urderrgo only a sli$rt ancrnt of deflection shorld be desiqned for a lateral ear+h pressure ccngrted on tlre basis of an equivalent fluid unit weigtrt of 45 pcf for backfill consistirg of tlre on-site granular soils. Cantilevered retainirq structures v*rictr are selnr:ate from ttre re-sidence ard can be elpected to defleeb sufficiently to nrcbilize ttre full aqtive earth pre.ssure cordition strould be desigrned for a lateral earth pressure ccrptrted on the basis of an equirralent fluid unit weight of 40 pcf for backfill oonsistirg of the on-site grrannrtar soils. Ttre lateral earttr pressure loadbg on wa11s can be reduced by 5 pcf equivalerrt fluid unit weigrt for granular backfill havirg Iess than 20? ndrns 2Oo sieve size rnaterial. Ttris may jncl-ude sctne of the on-site gncavelly soils. AII fowdation ard retainirq structures should be de.signed for appropriate surcharrge pres$lre.s such as adjacent buildirgs, traffic, constnrstion rnaterials ard equiprnent. ltre pl.essures reccnurerxled abve a.ssuttp drai-ned corditions bettird ttre walls ard a horizontal backfill surface. The buildq of water behi-rd a wall or an utrnrard slcpirg bacl<fill surface will increase ttre lateral pressure inposed on a for:rdation walL or retairlirg structure. The lateral :resistance of fqrrdation or retainirg waII footirgs placed on urxiisturlced natu::al soils wiII be a conrbiration of ttre slidirq resistance of ttte 'lr',, footirg on ttp fq:rdation rnaterials ard trnssive earth pressJre against the side of ttre footirg. Resistance to slidirg at ttre bottcms of tlre footirgs can be calqrlated based on a coefficient of fricEion of 0.45. Fassive pressure agairst ttre sides of tfie footirgs can be cal<rrlated usirg an equivalent fluid unit weight of 350 pcf. ltre coefficient of friction ard passive pr€ssure walues reconrnerded abcnre asstue ul-titnate soil sbrergftr. Suitable faqbor:s of safety strould be included in ttre desiqn to limit ttre str:ail dridr will occr:r at the ultirate strergttr, particularly in the case of lnssive re.sistance. FilI placed againsb tlre side-s of tlre footings to resist lateral loads slror:ld be a granular nnterial. FilI strould be placed ard ccnpacted to at least 954 of ttre rnaxirnun stardard Pr:octor density at a rnoisture content near optimun. 8rIE GRADIIG Wiftin the prcposed buildfug area, potential for constnrction irfticed slope instability appears lcrvr provided good de.sign ard constnrction procedtlres are follovied. Tro reduce tlre poterrtial for slcpe instability, I'rte reconmerd pennanent cut ard fiII slopes be constnrsbed no steetrEr than 2 horizontal to L verbical- ard ttre fill sesbions be adequatefy ccnpacted ard dLained. FiIl sections will probably need to be retailed witl. structr:r:al walls siJrce tfie natq::a1 slope is about 2 horizontal to l- verticat. Disturlced ar.eas includirg crrt ard filr slope-s should be revegetated or protected k1r ottrer neans to reduce erosion. Trqporary e:<cavation slcpes should be constructed in accoldance wittt OSHA requirqrcnts for er<cavations (29 CFR Part L926 - enprded). Based on o[.lr obsenrations of ttre soils elposed in the pits, we believe tfre soil can be assrlned to be a T\zpe B soil. The achral soil corditions strould be evaluated at ttte tire of excavation. , 'l, 1,., -7- Fitl placed in sribarilgnerfts can consist of on-site soils e><clusive of vegetation, topsoif ard oversized rrcck arrt shculd be ccnpacted to at least 95E of ttre naximnn stardard Hroctor density at a npisture content rear optfunun. kior to fill placernent, ttle g:ourd surface strcuLd be prepared t1z rernovirg all vegetation ard topsoil, scarifyirq to a dq>ttr of 8 inctres, adjr.rstilg tJ:e npisture content to near optim.nn ard conpacbiry to at least 90* of the rnaxinm stardarrl l>r:oc*or densiqz. Fill strould be benched into hillsides containirg slopes of 2OZ gr:ade or steeper. CUt ard fiU depttrs stnild not ercceed abctrt l-O feet. FTOR SIADS Ttre natrr::al on-sit€ soils, e><clusive of topsoil, ale suitable to supports fightly to nrcder:atety loaded slab--onna:ade constnrebion. To reduoe the effects of sone differential mwenrent, floor slabs should be sepa::ated from all bearing walls ard colr-uurs with epansion joints vfiictr allcr'r unrestr:ained verbical ncvement. Floor slab control joints strcnrl-d be used to reduce datnage due to strrinkage cracking. Ihe reqtrirenents for joirrt spacirg ard stab rej-nforcernent stroul-d be esbablistrcd by tlre de.sigrner based on elperienoe ard ttre interded slab u.se. A ninimnn 4-irph layer of free{::ainirq gn:avel shcruld be placed beneath basenent level slabs to facilitate dr:airnge. Ihis naterial strculd consist of nirus 2-irch aggregate with less ttran 5Og passirq tlre No. 4 sierre ard less tlnn 2? passirg ttre No. 200 sieve. Atf fi11 naterials for sr4ryort of floor slabs strculd be conpa.cted to at Ieast 95* of rmximln stardard Proctor density at a rrcisture content near ' lt. ,,,' ;r l' -8- optiJrrnn. Required fill can ccnsist of ttre on-site sards ard gravels dsroid of vegetation, topsoif ard oversized rock. T'DDMDRAIN sASf,E.I Althoudl free water was not encontered durfuq our erploration, it has been cnrr operience in nptrntaincus areas tlnt focal perched gnorrdwater may develcp durirg ti-rnes of hear4r precipitation or seasonal runoff. F)pzen groud during ryrirq nrrroff can create a perctred ordition. We r"eccnurerd belour grade constnrction, suctt as retaining wa1ls, cr:awl strne ard baserent areas be protected frun wettirg ani hydrcstatic pressure buildup tryr an urderd::ain system. The d::ains strotld consist of drain tile placed in ttre bottcrn of ttte waII bacUdill sunourded aborre the irvert. level with fr.eedrainirq granular naterial. Ttre drain shcnld be placed at least 1 foot belov.r fcruest adjacerrt finish gn:ade ard sloped at a mini:ntun Lt to a suitable grravity outlet. ffeedrainirq g::anular rnaterial used in ttre urderd::ain system shcnr]-d contajn less ttnn 2? passirg the No. 2OO sieve, less tian 50? passirg tlp No. 4 sierre ard have a naxirnn size of 2 inctres. Ihe d:rain gravel bacftfill shdrld be at least 2 feet deep. ST'RIBCE DRAIIG(E Ihe follo,rirg dr:airnge precautions strorld be crbsenred durirq constnrction and rnaintaired at all ti:re.s after the r.esiderre has been ccnpleted: 1-) Inurdation of ttre fctrdation occavations ard urderslab a:reas sfrcdd be avoided durirg oonstnrstion. 2) 3) -9- bcterior backfill sttould be adjusted to near opti:nm npisture anl conpa.cted to at least 95t of the nnxjmun stardard hoctor density in pavenent arxt slab areas arxl to at least 90? of ttre rnaxjnnun stardarrl koctor densitlt in lardscape areas. Itre grrcurd surface sunourdirq the exterior of the buildirq should be sloped to drajl away fr€m tJe forrdation in all dir.estions. we recomnend a ninimtm slope of L2 indres in tJ-e first Lo feet in unpaved areas ard a ninfunln slope of 3 ilches in the first 10 feet jl paved areas. FYee- drainj-ng rual-l- baclcfill should be capped with about 2 feet of ttre on-site soils to reduce surface water inf il-tration. Roof dcnmspouts ard drains shoul-d disctnrrge well beyord the lfunits of all backfill. IJMrIATIOIIS This reporb has been prepared in accordarrce with geno:ally accepted soil and fourdation ergineerirq practices in ttris area for use by the client for design Furposes. The concLusions ard reconurerdations sutxnitted in tJ.is report are based upon the data obtajred from the exploratory pits excavated at the locations irdicated on Fig. 1 ard tlre proposed tlpe of constnrction. The nature and extent of subsurfae variations across the site nay not becqe evident until e><cavation is perforrned. ff durirg constn:cbion, fill, soil, rock or water conditions appear to be different from those descri-bed herein, ttris office should be advised at once so reevaluation of the reconunerdations rnay be nrade. 4) -10- Wts reccnnerd qr-site &senration of erccavations ard fo.rdation bearirg strata ard testirq of stnrctural fill tlr a representative of the soil erqfuteer. Sincerely, cttEN-loRIlIHlI, NC. Revievred By Dfryec cc: JohrEorFvoilard-Arrhuleta, Attn: B& Inrnnes --*$$ryi- 24443 i /ww;A. I'a-_-. Steven L. Pawlak, P.E. .,, f ,- I i, ;t'.. t, o o N I PROPOSED RETAINING / e59 rSec a51( B5 WALLS 90 N, lo ^6( 5r )5 6' s: g /tm o PROPERTY BOUNDARTES i 30. UTILITY EASEMENT APPROXIMATE SCALE l" = 4ot 44||90 Chen€Northern.lnc.. LOCATIONS OF EXPLORATORY PITS Flg. I o Pit 1 Elev. = 8609' o Pil 2 Elev. = 85921 8610 8610 8605 P(uo I o P€ CJ LIJ 8600 P OJu- I Pr9 (lJ t! 8595 8595 WC= 10 DD= 1 15 Note: Explanation of symbols presented on Fig. f wc=to-( DD= 1 14I -200=28 =ll 00=21 L=23 I=B 4 411 90 Chen€Northern,lnc.Logs of Exploratory Pits Ftg. 2 black dium o cobbles and boulders, moist to we clayey with cobbles and boulders' it o LEGEND: H rcpsoil; organic sandy silt, w ffi Sanl and Gravel (SM-GM); siltY [i@ dense, moist, red. I F Hand driven liner samPle. l--- I i Disturbed bulk sample. r-- + NOTES: I I1. Exploratory pits were excavated on June 1, 1990 with a backhoe. I I Z. Locations of exploratory pi'Ls were determined from building location which was I staked in the field.Uy becf and Associates. I I3. Elevations of exploratory pits were provided by Beck and Associates. I I 4. The exploratory pit locations and elevations should be considered accurate Ionly to the degree implied by the method used. I 5. The lines between materials shown on the exploratory pit logs represent the I approximate boundaries between material types and transitions may be Sradual- | 6. No free water was encountered in the pits at the time they were excavated- ] Fluctuations in water level may occur wilh time. I 7. Laboratory Testing Results: WC = Water Content (%) DD = Dry Density (pcf) +4 = Percen! retained on No. 4 sieve -200 = Percent passing No. 200 sieve LL = Liquid Limit (%) PI = Plasticity lndex (%) 4 411 90 Chen€Northern,lnc Leqencl dnd Notes Flg. 3 tt rt HF 7 HN, MIN I5 MIN.60 MIN 19 MIN ,I MIN o = o. z oc o aF Fz o DI METER OF PANTICLE IN MILLIMETENS CLAY TO SILT GRAVEL 22 % LIOUID LIMIT S^MPLE oF C I ayey SAND 57 ry.SILT AND CL^Y 21 23 * ,,-ornctrY tNDEx I sandy gravel FRoM . Pit at feet to feet IIME NEAOINGS 60 MtN. r9 MtN.I MIN S I ANDAIIO SENIES 2a 45 HH.7 Hn. r5 MtN. (, = Fz (J ca o 42 iF fit Fz mod 3A 20 DIAMETER OF PANTICL€ IN MILLIMETENS CLAY TO SILT GRAVEL LIOUIO LIMIT SAMPLE OF % SILT AND CLAY PLASTICITY INOEX FROM S IEVE ANALYSISHYDROMETER ANALYSIS 4 411 90 Chen-Norfhern, lnc.GRADATION TEST BESULTS Fig. 4 cA-2-79 *r F86E c(t' (u aoLc'l P vl c, al't- Cf) c .EI q.) ro U ro a) aoL q - E F,l (f)c{ (\.1 c{ |-\rr) (\(\I <t tr) o o t_ lxt;l8 I'q l:t; I ao dl I rn + C\ Ol + o 'F -J f @ UJ IE F a [rJ dFc\ qicc\6r\/G 1FhJhcoJT FO dc0:q \)J TL o tr = l U) = - /.5:/ =(-' It C6tn frur 6>gi le8 @39,q I N, = 7';Yq'irP' tlz{ lrJt = 4'Ex 3,3*too lqs{ ()l *3X3 k/oo 4cso tQ"/-- 4xZfzw"" 3oo Wf = +t*:'* ilr.t4- o y'=s (on 5' loo +3?2-f b47.Qt =@ 6s.s lb Vp= l'?l fl,1 sr= F* , -\L zz/oq,z{tl 5t-{ Lt") 2- lz 2N q Y{8'{z' Io53 Sraz{ Ito?',7{ 47 38,{ 3c1?zz{ .fI. F 11, z t4t ,rG4- cos-zq4- 1ffra'z{ .6uluado pTq 01 :o1rd s.f,ep .repuaf€c g ueqlJalpT ou rfcua6e 6ulrnco:d aql 01 6u111:r.r uT pallTuqnsaq lsnu 1sa1o:d qcns ,{uV .1sanba.r rappTq rlcpa JouoTleuTuLre?ap s,z(cua6v 6u1.rnco:6 aql lsaloJd .f,eur fappTq v .6u1uado pTq roJ paTnpaqos alep aqla.roJeq sdep :epuaTpo LI lspaT le JappTq aq1 01 paqsTuJnJ asTA-raq1o :o peTTpln aq lsnE uoTlruTnrralap uallTJl!{?eq;, .6u111ro uT a:npacord s;q1 .repun lsanba.r :eppTqqcea Jo uoTleuTuJelap p e>1pu lsnur r(cua6g 6ul.rncord V 'plaqdn aq pTnoqs 1sa1o:d aql leql aouapTla sE Jo urnpueppe aq1 ,(q pa:1nba: 1pql uer{1 :a11aq ro 01 lenba sT paraJJo alnlTlsqnsaql leql ecuapTla sp uoTleurroJuT 1uau11rad raq1o.ro 's11nsar asel 'e1ep TecTuqcal qlTr'r palroddns tr11n3 aq lsnur slsalo:d :o lsanba: r(ug .6u1uado pTq paTnpeqcs Joalep aq1 aJoJaq szlep :epuaTrc gz ueqf ssaT 1ou ,6ur11:n uT 'r(cua6v 6u1:nco:4 aql trq paAT"caJ aq lsnu lsif6:d:o lsanba: qcns .f,uv .uoTlrcT1Tcads aq1 01 unpuappe r(ueuo pue ,{cua6g 6u1:nco.r4 ar1l zlq pagasuT uaaq alpq 1eq1sualT uo s1sa1o:d :o ,suollecg3lrJrTc ,slenba pano:dde:og slsanbaJl,Icua6g 6ulrnco:d/aq1 01 lTuqns r{eur :epp1q g Llo4 J.w.-,o)_.se.rnpaco.rd ?saq1 zlq pa.rlnba: se sXsenba: paluauncop ,ua111.rn 6u1111uqns go I1;1;qlsuodsar aq1 uo.rJ srappTq alaTfar'ralaltoq '1ou op suoTssncsTp qcns ..dcua6g 6u1.rnco:6 aq1qlTlq epuappr pue uoTlpcTJTcads slrq1 ssncsTp r{eu :app1q g 'epueppe pup auoTlecrElcads Jo AarrraJ {aas of s;appTq JoJ sarnpacord saqsTTqplsa uoTlcas sTt{& sgaoctcoud ilerAsu usqqrg 9Z'9I er1T,I a:n1eu61g altq 'L.I99 UgC Gt uT suoTleTn6aU pug lcvacuelsrssv uoTlegodsue:,L aceJJnS aq1 Jo (l) (q) .ro (Z) (q) Sgt uoTlcas 01 +uensrnd 1uaua.r1nba.r aql o1 uolldacxauE JoJ zlEllenb deu lnq t7g6l Jo lcv uog1e1:odsuprf,, eceJJnS aq1 Jo e (q) 99T uoTlcas Jo sluaua.rlnba.r aq1q1lat r(ldruoc louuec 1T lpql seTJTlrac ,{qaraq rappTq ar{f,, 88 /8 IO T;IITICVJ HSV}{ SNS BUS WASI.I FAtrILITY sgc-:t_Lg_N ol_Q]!l : Eut$r88IL_QE_H.Q&yr E[.';'*i.g.c_t_Qg-E.q]:-]_gt_L,:,8: The trr.o.ject, consists r,f aFaci I ity, I ithin the T*wn c,f Vai I f,r-rbl icasi slr curoelnts pt epar.eld by Mr-'r.t e.r"dat e C:crrr5i:;tg c,f tlte cc'rrgtrr"tct i c,rl c'f a cc,nct are r artc,rrt"vbt-tilding with prer-cerst n pr"e**:treissed cc.ncr.erter berarrr:; and d*,r-rbIe-t*;rernrf lnelrrberrs, c'ver"head cjuc,r":: and f ixed plarit ic glaaecl wirrcJr,wso ;rsinglel-ply r.nof ing roerrrh:r"ane, lr,:rrrr;inH arr autL:,r altie br_rs wa:;lrin;trInachirre, etqttiprl1errrt as$c,ciat{rcl therewitho di61giel f r_rel inll e*c1qiprrrerit.'l'he enclsserd p*r't i,:rr c,f ther hui 1d ing is apprrr,x irrrately li6r x ;?gtarrd has an attacl'ted unenclr,sed carrcrpy ;rpprnx ilrrately ;:$r x 4-lt t /f{|vin0 and otl'rer. :;ite i rrr pr.':verrretnt s are requir"ecl a:: par"t *f ttre 'Nt,t'k. Qg11f;r'act gI. Use of F,r.ernises: Lirrrit r_rse c,f the prerni sj,e*:; tc,c.:nstt'uet ic,n activities in ar.eas indicated; al lor^, f '::t I- c{rrrt inr-ranee ':,f tl't€ c,ther' act ivit ies conducterd try the owner" c.rr the giter. C,:,nf ine npenat irns t': areas within or:ntr.act I irrrits: incl ieateil.Fc,r'tions nf the site beyrrnd ar.eag in wlrich cc,nstt r_rct ir:,rrtJpel.;rt ii:,rr:3 ar.c? inct icatecl ia,r.e n$t t* be distur.becl. END OF sLV SECTION Ol(,lcI s7 Qe7 a,/68 1.1 / i1-7 new Et r-r si tJash i nq Wc.r"ks c:c'rflFr,L.nd, Arclr i t eret:r,n Cont r.ac: Ar-rqrrst _-_, l9AB. SUM|'IARY EF WORl.i .:) l.:) 1 i) -. I L /aJ FIETENTION ENGINEEFIING :i: i';:': ',,/,. Ulr..ar iga E'n *,1-E LltEl',.rn C}oLcnado BOI ea [3O3lgg+1133 (EOOI7e7-CEOO Photographa Sllder Gopy of Lcttct Eanch Fl€bention 6pealrlisEs -tfi':. LETTER OF TRANSMITTAL T0l ATTNI REr ( r/rrcsnrtrt covER sltEET WN ARB SENDIIIC YOU ( ) Plans( ) Calculatlonr ( .) ottrer DESCRIPTION () () () ) ) ) oan, a (4 (46._-. -. .. roBr 4.7-.q,-uf7 NI'MBER OP PAGES TO FOIIOI{ I lachnlcel Revl,cwg Stendrrd Planr Speclflcatlone ( ( ( IIIESE ARE TRAIISUITTED AS CHECKED BELOI{ ( ) for Your Ue: ( )! .ljot Approval a i( TAe Requeeted a t For Revley And Gomrncnt Approvrd Ar Notcd Returncd After Loen To Ur SEMANKS ,tt ".t . r! llt*i -_. ,:! rlgfib3n ^d - g611s t0r 2' . pAcE t or / .- BY ,4r'.|-g I I i I I TO BEGK AND A;:,ofi!|trt, rNG.o vAtt, coLoRADo 81658 LETTfuF TRANSNflITTAL the f ollowing items: n Specifications (303) 949.1800 WE ARE SENDING YOU n Attached ! Under separate cover via tr Shop drawings n Copy of letter n Prints E Change order ! Plans ! Samples fl coPtEs DATE NO.I DESCRTPTTON l'.c,[--[e1 -j\*V-p".\ THESE ARE TRANSMITTED as checked below: ! For approval n For your use n Approved as submitted n Approved as noted ! Resubmit-copies for approval n Submit -copies lor distribution n Return -corrected orintsljts requested n Returned for correctionsI /n For r""i"* and comment n - f] FOR BIDS DUE-19- ! PRINTS RETURNED AFTER LOAN TO US 'rc \-.--* \*-\o\ t^-s-.*\t U- olt._-.*\-\-.- \ a.^-\=, \}.. COPY TO Piot Jcr249.2,/rrffil'hc., G.rro., [k* 01fi lo mr Plort ro,L Fnft 1.$25.63o ll enclosurcs a.e not as noleal, kindly nolily us al ohco. E:r'rr.P - trJ? 53eO W. Guenlca On # 1-BLitbloEon, Eolonpdo EOI eO i3os] e33_1133 tBoo) 7e7.36OO Mr. 73 Val fct Retalnlng walt for tho Ccrtsolr Reridcncc. Doar grsg, Mr' Frank payne of Bcck & Assoc, hrl requcstcd thar I wrrto to you and addrcc,thc probtcm of rh. rerrtning wrlt i;; ino c.rirot;-Ra;rioirr, My undrrrtandtngIt that rhcrc rro two_ rremr-or-roni.rn wrrh ,rrf..i- ii" ,r,o r.tarnrng wrrlproposod for ths north rldc of iio-iij're*ay 1nd rhat thay rf0 er followr:(1') Thet r rctrrnrng wail 0rr bo conr!rucr?d.wi thin tho spac! dsfinad by thcdrlvowry bolow thc wali and tf,."pirprrry ,,n, rbovr the watt. Ilit.:;lrf:r';::il?:;:tod ur lnB tho rctrrning war r conrsurat ton rndrcrrcd rn (2.) That rn excavrt ion crn bo 11do_ fo.r tho purporc or Inetal I Ing rhorrtrlnlng wal I wlthout undormlning iot.to0 prtch road rbovo thc wat r.Thlr crn bc rcsompllrhcd utlng r rrlot cuir technlquc (reo RE, Tcchnlcrt Ravlcwll2). tn rhtr way rhc cxcrvarton will rematn opcn ;;; ;;;; I mlntmrt rmounr ofttmo (t-2 drvr) bororr bcrns;;;r;;;'*i,r, .,,. lri.i.ini""i'. wrth r qurrfredool lr cngrnccrir rpprover, irrr;';;;;.r;rr hrr bqen rucccsrfur fn thc pa3r. Plsrsc lrt mc &now lf you hrvc eny furthcr queslton:. Slnccicty, /uW iEfiEi^ffi" Etr,gh FleEenEion Speeialiggg J uno 21,r 990 Grcg Hatl S. Frontag,c Rordt, @ 81657 Alan Strockcr JUt'{- 5-9r:r 1 .+ : El r:1 lit +. r.- '+ r-r t. | .:. r-r E r-r .l . .tTLIE / ntre nlon OrroJEcr NAME - tilcoRPoRATEo ..F -_ 133 Joa NuMein ' I I rtalrEEnrt{(i DArE ar".,r"r?at*l r'I 'l' I.r I'ti 'l. l'rlt.I l..t ir+".rf .t.i ;1. ,'i l- ll ; i'i i'':1|, --l r .',.1 ',Ji''l.'; f r- 1-i 1. ''r l .:-i- t-t.'. : i .....1 ,i. -.r .l r. l. -r. r. l. -,,... i '' F. 't .t'i'l I M,r. t4,\\u.^ IE ETJUNlltgsl June 11, 1991 Gary Murrain Town of VaiI Department of Community Developrnent 75 South Frontage Road West vail, co 81657 Dear Gary: This letter is to confirm that the boulder and drainage work at the Cerisola Residence, Lot 29, Block 1, Potato Patch has been done in cornpliance with the attached inforrnation from Craig Robillard's office. This verification of cornpliance has been requested by the Toltn of Vail staff before a Tenrporary Certificate of Occupancy is awarded' Please call if you have any questions or comments. \'r--Y t Fr:Project Manager Beck and Associates, Inc. cc: Dan Staneck Mike MoIlica I t Project Application ProjectName: C o ? o^r" 5. /'? l ' * Projecl Description: Contact Person and Phone Owner, Address and Phone: Architect, Address and Phone: Legal Description: Lot 21 Blocr< / , r,t,^n 7a'6-* /*A( , zon" P/S Comments: Design Review Board Date Motion by: Seconded by: APPROVAL DISAPPROVAL n^ Irc.4 H,4 Town Planner 6a1a' 5'l'?l (.,",, Approval J o VAIL POTATO PATCH Q"-'--t DATE: JAN 9, 1991 LEGAL: LOT ADDRESS:POTATO PA OWNER: ARCHITECT: 29 BLOCK 1 FILING CERISOLA RESIDENCE pHoNE */0,7\ SNOWDEN & HOPKINS PHONE # 4e73 f d'*lo{* 4ao15€r/rauJ lS THE LOT SLOPE OVER 30% ,,::,YES/NO NO I 2.0 NO;, OF GARAGE.,SPACES,,i :: .. :; ::: ;.:,;r:; .,..' ... .',,.'. " .,.2.0 0.0- 0.0 ALEOWED SITE COVERAGE.,,. .;;r:::,r ,,,, ,' ' ,0.0 0.0 SITE COVEBAGE REMAINING 0.0 0.0 SED ON SITE ::: ,:l ri: ii,:i i::r .., i :'.,'r,',: :,.:," :,4,091.0 lffi# 29.0 97.0 (s.0)0.0 (1s.0)0,0 UNIT ONE BASEMENT SQ.FT:796.0 0.0 28.O 0.0 0.0 0.0 7.0 2,254.0 0.0 250.0 105.0 1 10.0 0.0 21.0 2,331 .O 571.0 25.0 0.0 94.0 65.0 34.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 CHEDIT TOTAtS.Ui , , 'r,290.0 CREDIT TOTALS i 571t0 :, ,,, ::, :,tt::303.0 I ,,,,: :204.0,i50,0 :,::: ,,:'r'62.0., ADDED GRFA(IE 250?)0.0 29.0 97.0 (s.0)0.0 (1s.0)0.0 0.0 GRFA USED ' . '. .. .4,091.0 GRFA REMAINING, :: ,,(4,091.0) I .-l s APPIJICATION FOR RIVOCABLE A STRUCTURE ON A (Please type or Prlnt) Novernber 9, 1990 TO ERECT OR I.IAINTAIN RIGHT-OF-WAY Fence I{al1 PERMIT PUBLIC LandscapLng- other x OWNER OF PROPERTI NAI.{E OF APPLIEANT Patsv and Pedro Cerisola . Pamela Hopkinsr/Snowdon & Hopkins - Architects 201 Gore Creek Drive, Vail, ColoradADDRESS LEGAL DESCRIP1ION OF PROPERTY TO BE SERVED: rnr 29 BIocK 1 suBDrvrsroN vail P.otat-o P3Ich (If necessary, attaCh descrlption on separate sheet) ' corner lot - Inside lot - DESCRIPTTON OF STRUCTURE OR ITEil(S) INTO RIGHT-OF-I{AY:Amendment to the July 30, 1990 application to include tie back els as shown on Robillard & Associates drawinq dated November 1, 1990. ProPertY lLne, . sldewalks,-urbs, intakes, hydiants, meters, mlnholes, anl .other affected appurl"nance in tire projirct area (to scale or-dl.nensioned) and sLltton(s) as weII as elevations (if appllcable). Does structure presentlY exlst?Yes Proposed date for conmencenent of constructlon In consideration of the issuance of a revocable pennit for the structure above indicated, appl,icant agrees as follows: 1. That the structure hereLn authorized on a revocable perrnit basls Ls restrlcted exclusively to the land above descrlbed. 2. That the permit is lirnited specifically to the type of structure-described in thls application. 3. That the applicant shall notily tbe Town Manger, or his.duly authorl-zed-igent, twenty-four lrours Ln advance of the tlnre for cornmencement of constructlon, ln order that proper J.nspectlon may be made by the Tor,rn. 4. The-appllcant altrees to lndennlfy and hold harnless the Town "i Vaii, lts ofilcers, employees and agents from-and agalnst art tlautlltv, claLns and- dernands on account of lnJury, loss or damage, li.rcludlng without limitatlon c1alus arJ.sing fron bodily injury, personal lnjury, slckness, disease, death, propeity ioss-oi darnage, oi any other loss of any klnd Itralsoever, which arLse out of or are in any manner connected wlth applicant's activlties pursuant to thls permit, 1f such iniury, Ioss, or damage Ls.caused Ln whole br in iart by, or is iiairned to be caused ln whole or ln part b-y, the-act, onissJ.on, errorr professJ-onal errort -iofst"X'e, negligence or other fault of ttre appllcant, hl-s contractor or subcontractor or any offJ.cer, employee-or representative of the applicant, h"is contractor or his subcontractor. the appileant agrees to lnvestLgate, hand1e'respond to, and to pr-oviae defense for and defend against, any- such liabtlity, clairns, or dernands at the sole expense of the appllcant. The appllcant also agrees to bear alL other expenses relating tirereto, includlng.court costs and attorney-rs fees, wheth6r or not any such llabtltty,-claims, or denairds a1leiJed are groundless, fal-se, or fraudulent' Appllcant aSfge? to procure and maintal-n, at lts own cost, ap9Jr9y or polJ-cJ-es of insurance sufficl-ent to ensure agalnstall liabirity clalms, denands and other obligatlons asiumedby the applicant pursuant to thls paragraph 4. Appllcants further agree to release the Town of Vail, ltsofficers, agents and ernployees fron any and all llabill.ty,claims, demands, or actions or causes of actions whatsoeierarising out of-any damage, loss or lnJury to the applicant 9r to the appllcantrs property caused by the fown o-f Vall,its officers, altents and employees whife engaged inmaintenance or snovr removal actl.vitles or any-otheractlvit,ies whatsoever on ,Iovrn of Vail property, etreets,sidewalks, or rights-of-way.5. That the pennlt uray be revoked whenever lt ls deternlnedthat the encroachnent, obstruction, or other structureconstitutes a nuisance, destroys or lrnpalrs the use of theright-of-way by the publlc, constitutes a traffl.c hazard, orthe property.upon-which the encroachnent, obEtructlon, orstructure exLsts is requlred for use by the publlc; or itmay be revoked at any tine for any reason deemed sufflclentby the Town of Vail.6. That the applicant will remove, at his expense, theencroachrnent, obstruction, or structure wlthin ten daysafter receLving notice of any revocatl_on of saLd perrnLt.7. That the applicant agrees to rnaintain any landscaplngassociated wlth the encroachment on the right-of-way.8. That in the event sal,d rernoval of the encroachnentr-obstruction, or structure is not acconplished wlthin tendays, the Town is hereby authorized to remove same and havethe right to rrake an assessment agal.nst the property andcollect the costs or removal in the same manner as generaltaxes are coLlected. \, 9. l_0. That the applicant has read and conditions set forth in and understands all of the termsthis application.Special conditions: x .4Vo res) APPROVED: Property ownerershlp, both signatu Developrnent lD.t APPLICATION FOR REVOCABLE A STRUCTURE ON A (Please tl1re or print) PERI'TIT TO ERECT OR I{AINTAIN PUBLIC RIGHT-OT'.I{AY Fence WaIlIandscaping-Other x D11g JuIv 30, 1990 OWNER OF pROpER1'y Patsy and Pedro Cerisola Na11E Ol. AppLICNtT Pamela Hopkins/Snowdon & Hopkins Alchltegts ADDRESS 201 Gore Creek Drive, Vail, Colorado 81657 I,EGAL DESCRTPTION OF PROPERTY TO BE SERVED: Lor 29 BIocK 1 suBDrvrsroN @(If necessary, attach description on aeparate sheet). Corner lot - Inside lot - DESCRTI{IION OF STRUCTURE OR ITEM(S) rNTO RrGHT-OF-WAY: The actual tie backs to the retaining wa1l system to allow for the Cerisolars driveway. Attach plans showlng encroachrnent, property line, sidewalks,curbs, lntakes, hydrants, neters, nanholesr ary other affected appurtenance in the project area (to scale or dinensioned) andsection(s) as well as elevations (if applicable). Doe6 atructure presently exist? _N9 Proposed date for comnencenent of construction j]llr-lLd93! In consideration of the issuance of a revocabl.e perrnlt for theetructure above lndicated, applJ.cant agrees as follows: 1. Bhat the structure herein authorlzed on a revocable pernit basia is reetricted exclusively to the land above described.2. That the permit iE llnited specifically to the type ofstructure deecribed in thiE appllcatlon.3. fhat the applicant ehall notify the Town Manger, or his duly authorized agent, twenty-four hours in advance of the tinefor cornnencenent of construction, in order that proper inepectlon nay be nade by the Tonn.4. The applicant agrees to lndennify and hold hannless the Townof Vail, its officers, enployees and agents fron and againstall liabllity, clains and denande on account of inJury, lossor danage, including wlthout lirnitation clains arising fronbodlly lnJury, personal lnjury, eickness, disease, death,property loss or danage, or any other loss of any kind whatEoever, which arise out of or are in any manner connected with applicant'E actLvlties pursuant to thispermit, if Euch inJury, Ioss, or damage is cauEed in whoLeor in part by, or is cl.ained to be caused ln whole or inpart by, the act, omission, error, prof,essional error, rnlstake, negligence or other fault of the applicant, hls contractor or subcontractor ar any officer, enployee or representative of the applicant, his contractor or hissubcontractor. The applicant agrees to investlgate, handle respond to, and to provide defense for and defend agalnst, any euch liabillty, claims, or dernands at the sole expenseof the applicant. The applicant also agrees to bear all other expenses relating thereto, including court costs and attorneyrs fees, whether or not any such J.iability, clairns,or dernands alleged are groundless, false, or fraudulent. Applicant aSlge? to procure and naintain, at ltg orn co"t, a'pglrgy or-poricies of LnEurance sufficient to ensure agaiirstal'l llablllty clarns, denands and other obrigations asiunea-by the appllcant pursuant to thie paragraph i. Appllcants further lgree to releaee the Town of Vall, ite 1f!,icers, agents and-emptoyees fron any and aff ffiriliat,cralns, denands, or actions or cauaes of actlons wbatEoeierarislng out of.any danage, ross or injury to the apprrcini-or to-the applicantrs property caused by-the town -oi Vall,rEs otttcera, agents and enployees whlle engaged lnmaintenance or Enow renoval- aclivities or aiy-otheractlvltlee whatsoever on Town of VaiI properly, atreets,sldenalka, or rlghts-of-way.5. That the pernit nay be revoked whenever lt is deter:ulnedthat the encroachnent, obstructlon, or other Etructureconstitutes a nuisance, destroys or lmpairs the use of therlght-of-way by the public, constltutei a trafflc hazard, -or the property.upon.whlch tha encroachnent, obEtruction, oretructure exlEts is reguired f,or use by the publlc; oi ltlay be revoked at any t,lnre for any reason deLned euff,lclentby the Town of ValI.6. That the appllcant wlll renove, at his expense, theencroaehroent, obstructlon, or structure wlthin ten daysafter receivlng notice of any revocatlon of eald pernit.7. That th6 lpplicant agrees to-naintain any landecaiingassoclated with the encroachnent on the itgnt-of-irayi8. That ln the event said removal of the encr6achrnent,-obstruction, or etructure iE not accornprrshed wtthin tendays, the Town is hereby authorized to- renove sane and havethe_rlght- to nake an assessurent against the property andcorlect the coets or trenovar ln the eane naniref aa leneraltax€B are collected. 9. 10. That the appllcant has readand condltlons eet forth In and understande aII of the terurEthle appllcatlon.Speclal condltions: Please notif the Owners before any work begins so that can coordinate efforts so as to minimize dam /" loL4 -.--,-i-- Date /re6) i / Date InFnotlnD! Dl rector Dl rnnt p, both slgnatu Development It:to a4b Dateuanager \ T \ oo" l, oo h4lIvr ^)1,*' \ --t $',)\ il a \ \')\\ \ \ \ \ \\ ii\rr$ \f-r \MR \+ s ( ? s \"\i rS )' $ $t-r. -t $ \r.\t,F \ v'rS-l7( \ 1 \--\ \\ t .{. $I r 0 4 \$. \ t\\ \ \ \ \k '+^\ :-* t$ TN $$,-oz 'J.\\ \\ \\I -.,.t \\\ ffi$ h\ I {r \t { 1 $u \\- t,' _N It\ -t -_I- il tt."r-{ :t't!.-t L' i\ + -'d.- j 1t t t .i,t I +#,K +I .Jf \s:b+ NN s $s $. r.-s\\P , i' +* 8J7 *, Al' I -<-L La.4l'a ,I!a -rr4 TI.Ynof d,i ,lt =umH; $ N-t\T,|.\' , t:l tt :-. 't'\ \\! - ,,T tll 4 Al $\.R\il T.s\F 5 s sl$s- )EL s+ Nsqc. s F t St.-_ N \\ \ $ $$ us$ fitr\ii\( JN xN If tf! tJ $ \ \ :\:.S\ $ N 3 \^ \ o .r\' KN N $ o ,-. - + qteu 'b- -L/1U Il' -.g 3 v.Ill ,.p a/t ts v .rl {u j .l $s-$J$ s\i s o&t+I Fss \\* 7,J$o" to =gAAs N \ €E\ s \ /"3 il/'{rt-$K$t\tAS s,! ,17 k/ bI 3 -o II t,aq. 3,,.4 V ttr o I g C )A- \ I o '5 dtIl EIt j -,' 4o sj? Jl j to fr's J\ slI I II \ \ I+ a , F.htsI e, $f"J t.. I U I U t I NTEP..OEP.qRTNENTAL REVI Et.| P?OJECT: D.(TE SUSI,IITTED: j . rz .so COI."'IENTS IIEEDED 8Y: ERIEF OESCRIPTION OF TTE PROPOSAL: DATE OF PUELIC HEARING 7.23 .?A dollA ,[ 4" b*-L' D* *% POLICE DEPARTT4ENT Revievred by: Connerrts: REEiEAIiOII DEPARTI.::NT t 'tr' ..!j; Revie'aed.by: Cor:uents: "r" Tf,rfro . D Altil y-se'j,-" -f A/"^ Date Date t' PIANNTNG AND EM/IRONIIENTAL COUMISSION July 23, 1990 Present chuck Crist Diana Donovan Connie Knight Ludwig Kurz Jirn Shearer Kathy Warren Dalton Willians StaffKristan Pritz l,lLke Uollicashelly ltello Andy lGtudtsenJill Kannerer Betsy Rosolack Penny Perry Susan Scanlan In the lnterest of time, work sessionE were held prlor to tbe publJ-c hearing. A work sessLon for an amendment to Town of Vail Ordlnance No. 24' susan scanlan presented the proposal as per the staff memo. A work session for a conditLonal use oernit an9 a,setback variance for a remediation system equinment building at thq alpine stanaara stition. earl of f,ot e. vait vltlacre zna fllinq. 285 s. Frontacre Road west.Applicant: Arnoco Corp. Ton McCurdy, representing the Anoco Corporation, responded to the issues addiessed in the neno explaining that contamination was found on the Gateway site. However, they dld not yet know the. extent. After talklng with staff, Amoco chose the proposed site because it would cause the Least hardship for all concerned slnce any other location deleted parking spaces. Regardlng alternate neLhods, the proposed design was the best for ttre situatj-on. It was possible they would need larger wells, however, they had already allowed for additLonal apace in the room for an additional air stripper. Amoco orlginally proposed to use a portable building. He said that staff had cornmunicated concerns Ltrat a portable building would not neet design criterla. negarding the use of ttri Gateway site rather than the Alpine Stindard site, the present owner dld not want them to use the basement as ltas originally planned. lhe owner had ex;lressed concerns of liability and parking. Series of 1983 and Ordinance No. 28. SerLes of 1987 governlng 'l Chuck Crist asked how noiey the systen would be and Tom litcCurdy explained that the only noise would be generated by a compressor. The conpressor would be withln an enclosed building and the inpact would be ml-nLnal . He felt the noise from the highway would be more obtruslve. Chuck then asked, lf the problen was more extenslve thanoriginally thought, would Anoco have to bulld another etation else where? Frou what dLstance could the wells be punped? Ton ltcCurdy explalned the welle could punp up to 200-250 feet away. Dalton and Ludwig had no comenta. Diana asked how deep they tested the water and Tom UcCurdy explained they test anlnrhere fron 20 to 4Or below the ground surfac.e. Diana alEo asked holr much water would be processed in 1 day and Tom Mccurdy explalned that the systen processed 35 9a11ons per ninute. biana was concerned about how the water and Sanitation department would handle the situation and how it would affect the Townrs water supply. Tom uccurdy explained that the water would be discharged to the t{ater and Serrer plant and t}re water plant discharged to the Townrs streans. tte did not feel that 35 gallons a ninute would affect the water supply. Kathy warren asked Ton Briner, the architect for the project, if they would be able to bem on either side of the buLlding and Ton stated ttyestt, on the sides but not the front or rear. Diana felt that the applicant should consider extra insulation to nitigate the noise. She asked Kristan if thiE would be an oppoitunlty to clean the island/area up and Shelly renlnded Diana ana tne boird that there is a possibil'ity of a eidewalk as well. Tom llcCurdy explained that there was an unidentlfled easenent and Diana felt that it was an lssue that staff could handle and inforn the board if it would be a problen at the next neeting. Shelly felt that ttre Town needed to Eee the final reports when they -ane out before naklng a recommendation and Tom.Uccurdy did;'t feel the final reports would affect the location of the building. He felt the present neeting was to center around tlre aesthetics, noise etc. chuck Criet asked how the air diEcharge was done and tf it requlred stacks. Tom Uccurdy explained that vents would be used. Chuck also wanted to know lf there would be an odor and Ton ttccurdy explained tlrat the odor would be no rnore than the gas station itself. I Bruce GiIIy, rePresenting the Holiday House, s$!3a that the ounere were ltorrtta iUou€ the properly value.going down due to fi;-;;"i;nlnation-[nil-ipp.are-a t-o be-under the Holidav House-. -bulldlng. rney wouid lr-ka to see the area cleaned up. -They did want to knos if there uas danger. They dldnlt want to find gas in their Uasenenil--i"- i"X"a, -if they irsed the existlng welIs, fr"r-Ifr"-pff"r ,ouia be latd ind Ton frcCurdy explained that the pipes wouta all be undergrounded. Jirn Shearer asked lf the funes fron the air discharge vould be flammable and Bon t'lcCrrrdy answered rrno'rr Diana Donovan Etated that in general Ehe felt the proposal was a rrnecessary evil. n The Planning and Envl'ronnental Conmission public- neeting was called to orcler at zifo p.n. by Dlana Donovan' Cha5'rperson' Iate, Item No. 1 \tas PostPoned to Ullt€ troUlca explained that the appligalt? y:r: r:Suesting a '.variance fron a riifror allowabliirall helght to provide for the construction of "-i"il-"f"gl" iitify home. -The variance requested wourd allow ror waii rr-fg6ts rangtirg from 3.^feet to 1o's feet in heisht. The averi;; ;id" of tlr6 15t beneath the proposed residence and clrivtway wls approxinately Sot: In order to access the site, the appJ-icairts were-p""p".i"g a dliveyay vtth a rnaxirnum g;ia.-"t'e*. Tir;-;a;ii-recornLndition-was for approval of the variance request;d-i"i-"-r"ximum wall height of 10.5 feet per the a".ri""r r"fi^itt"a.--stiri Uettevea the r-guest would not be a ffiii"ii"g. and would not be detrimental to the publlc health, t.?.-y or-welfare' The topographic conditions of the site created-u"i'.f"" developnent consi-tleiations, and.the. staff betieved that a h;;Ghip would-be- inposed upon the applicant if the strict and lia;;;i-iniertrrretatio-n of thL zonlng.code -t:t9--t? be enforced. Th;-fi;dings sirpporting the variance included rv A' B, and c2. Pan Hopkins, representing the applicant, agreed.with the Etaff presentation. sn.-.ipi"inea thilr f! thg.architect on the ;;];;;;-l[ii'tri;a ve-ry rrara.to avoid askins for a variance. Hor ever, "*."rr=r.iJ eoii iesting deened the variance request necessary. Pam explained the type-of roaterials to be used in constructing trre wiii ana showed-photograplt ?1|^:Ianples' :lt" added that the "ppir.a"i had upgrided €,ne- landscaping since the original proPosal. Since t Chuck Crist asked what color the wall was proposed to be and Pan ansgered ttgre1r . rl Connie Knight explained that she had seen Georges Boyer, an adJacent pioperty ouner' ln the roon earlier and asked lf he was foi or against the proposal and llike explained that he wanted to rnake sure the hone was Proposed solely on the ownersr land, that it would not encroach lnto the open apace tract Lnnediately adJacent, which lt did not. condition: Landscapinq be uporaded to the followl'nq; 5 12r-14t Endleman SDruce 2 12r-14r BIue sDruce 6 3n-4n caliPer AsPen VOTE: 7.0 IN FAVOR ,, .,, .- ! .. 1 A motl.on to anorove the recnreeted wall helqht variance oer the staff neno wlth the condltlon lLsted below saE nade bv Kathv Warren and seconded by Chuck CrLst. Applicant: Jerry Farcnrhar Andy Knudtsen presented the proposal explaining-that the appiicant proposed to bulld a sun room on an existing deck- in flont of his single fanily residence. The sun room would be 16 feet by 12 feet ind would be located 1n front of the living_ roon of the residence. The existing structure currently encroached 3r-6n into the west side yard setback and the applicant proposed to allgn the new addltion-with the existing house, creatlng a sinilai setback encroachnent. The staff reconmendatlon was for approval of the requested variance. Because the existl.ng house wll in the setbaqk creating a physical trardship, the onner desenred relief fron the strlct eetback requirement. The variance would not be a grant of speclal privilege as the tlpe of sl-tuation was Justification for other variances in the-past. -There would be no negative lnpacts on adJacent propertl'es. The related findlng included Iv A' B, cl and C2. Itern No. 3: Meadow Ridoe Road TO: FROM: DATE: SU&'ECT: Plannlng and Environmental Connl.ssion Conmunity Development Departrnent JuIy 23, 1990 I. *'** A request for a variance from the wall height requirement on l,ot 29, Block 1, Vail Potato Patchi 805 Potato Patch Drive.Apptlcants: Patsy and Pedro Cerisola DESCRIPTION OF THE VARIANCE REOUESTED The appllcants are the owners of Lot 29, Block I, Vall Potato-Patch (805 Potato Patch Drive) and are reguestlng a varl.ance frorn-a rnaxinum allowable wall height to provide for the constructj.on of a new single fanil'y home on the lot. The variance reguested woula ittow for walI heights ranglng from 3 feet, up to 10.5 feet in height. Section 18.58.020 (c) of the Town of VaiI zoning code allows for a maxinum wall height of 3 feet within the front setback area, and up to 6 feet on any other area of the property. This section of the code reads as follows: rrFences, hedges, walls, and landscaping screens, ghere not restrictea by covenant or other legal instrunent, shall- not exceed three feet in height within any required front setback area and shall not exceed sl'x te6t in height on any other portion of a siter.provided that higher-fences, hedges, walls, or landscaping screens nay be authorized by the zoling adninistrator where nece-sary to screen public utility eguiprnent. No barbed wire or-electrically charged fence shall be erected or maintained.rl 134 feet of the proposed retaining wall nould be within the front setback area lnd 51 feet would be out of the front setback area. All of the wall is on the applicantrs property. The average slope of this lot beneath the proposed reEidence and driveway ls-approxlnately 50 percent. -In order to access the 3lte, LLe appllcants ale proposing a drJ-veway sith a naximum grade of 8 Percent. II. ZONTNG CONSIDER,ATIONS A. This lot is located within the Residential zone district. B. The adJacent land uses are as L. North - Potato Patch Road zoned Priroary/Secondary. Prinary/Secondary follows: and L'ots 5 t 6, both 2. South - Tract A, zone Agricultural & open space' 3. East - Tract A, zoned Agrlcultural & open Space' 4. t{est - Lot 30' zoned Priroary/Secondary. III. CRITERIA AND TINDINGS Upon review of Criteria and Flndings, section 18.62.060 of tire vail Munlcipal code, the Department of Connunlty. Development rec-omrnends approval- of the requested variance based upon the following factors: A.Conslderation of Factorg: 1. The relationshfic of the recruested variFnce,to @ential uses and structures in the vicinitv. The requested variance, lf approved' would-not adversdly affect the use or enJolnrent of adJacent properti6s and would not block or inpede vl'ews lroin any surrounding properties. llhe westernmost retaining wall would be alnost entirely ecreened frorn vlew by the sltlng of the resldence (see attached site plan). PortlonE of the eastern retainl-ng waII-wouid be visible fron properties Iocated Eelow thls lot. Houever' the applicants have proposed to heavlly landscaPe the area inrnediatily below and in front of the retainlng wall . The-applicantrs are proposlng to bre-ak up the nass of the wall with the planting of three 8- foot Englenen aPruce, one 6-foot-Blue epruce, and three :linch caliper aspen irn:nediately ln front of the wall. All retainlng walls wlll be flnished wlth a etone veneer facinq, and this treatment w111 natch the sinilar finiiir on the exterior of the resldence, uhich we believe wll'l provide a unified aPpearance on the lot. 2. The topographic conditionE on th16 lot are such itrat tire-uuitaaute area of the slte I's very-we1l deflned. Because the average slope on the lot approxiuates 5ot, acceEs onto this site is ;-"i;;;rt-airii",irt. The applicants are proposins a drlvewiy with an average grade of 8 percent, vhich the-etaff consideri a reasonable grade to-- access the property. llhe proposed retalning- walls iie-nece"sa-ry io sirpport giades both above the driveway and below the drivewaY' The Planning staff belleves that the proposed retaJ.ning watts are necessary to-ensure ;6;iii";tion of the slopes ind Potato Patch Road' ata t. feel that the proposal is reasonable and c"itafnry necessary on this steep slte' The applicanis have re-searched using a 3t tiered wall, ii-"ia"t to avoid requesting a variance, however' tne-ioff" analysls and bearing pressures fronr Potato Patch Road would struciuially not allow for such a design. 3. The staff finds that frave no signiflcant considerations. the reguested varlance vill J:npact uPon anY of the above IV. EIND:INCS A.That the grantlng of lhe variance n111 not constitute a iii"t "i ipt"i"r-privilege inconsistent with the itrit.tion-s on otitet prolertieE classLfied in the same district. That the Eranting of the variance wiII not be a"iiir."tir to tfe pubric health, safety or welfare' or ;;;;;i;iii-r"j""io"-=-[o-pr"pertlis or inprovements in the vicinitY. B. v. C. That the variance is warranted for one or nore of the following reasons: 1. The strLct llteral interpretation or enforcement of the speclfied regulation would result in practica-l difficutty or unnecessary PlrVsicathardshlp Lnconsistent wlttr the objectives of this title. 2. There are exceptlons or extraordinary clrcunstances or conditlons appllcable to the same slte of the varlance that do not apply generally to other propertles Ln tlre aame zone. 3. The strlct lnterpretatlon or enforcement of the speclfled regrulallon would deprive the appllcant of prlvilegei enJoyed by the.onners of other properties in the same distrl'ct. STATF RECOMMENDATION The staff reconmendation is for approval of the variance reguest for a maxinun waII height of 10.5 feet' -per the driwings subnitted by Snowdon and Hopkins, Architects, Sheet a-1, dited JuIy 13, 1990. l{e believe the reguest would not be i grant of -speciat privilege and that the variance would not b6 detrinenlal to Lhe public health, safety or welfare. The topographie conditions of thiE slte have created some very uiriiue-developnent considerations, and the Plannlng sta?f beiieves that a hardship would be imposed upon the applicant if the strict and ti.teral J.nterpretation of the z-oiring code were to be enforced. The strlct lnterpretation ;i a# wait teight linits would nake it vlrtually inpossible to access the slte. pindings supporting the variance are IV A, B, C2. The Design Review Board has reviewed this reguest, at_ their June 6, iggo neetlng, and by a unaninous vote of 3-o has concepiually approv6i tfre proposal with the conditlon that if a iarian-ce iion the nax-irnun wall helght is requlred, that be obtained from the PEC. The soils analysis, which were needed to determlne the exact waII heights, were not available at the tine of the DRB revlert. Iu --f\'- +i q\ \-D-'- \ tt\ '1 \ T -rt5'si$.I. --\{'l r.--h --\i is- -- -itt1{ tiIS i{r-rr-{l,: Il R3 :li rdt \ + PUBLIC NOTICE NOTICE IS HEREBY GMN that the Planning and Environnental Connission of the Town of Vail wilt hoLd a public hearing in accordance wlth Section 18.66.060 of the nunicipal code Town of vait on July 23, 1990 at 2:0o p.[. in the Town Municipal Building. Consideration of: of the of Vail A request for a conditional use pernit for a rTelevision Stationr in the Cornmercial Core II zone district located at I€t 2, Block 1, VaiI Lionshead 3rd Filing, Sunbird Lodge, 675 Lionshead Place.Applicant: Vailr/Beaver creek Television Network. A reguest for an exterior alteration, a site coverage variance, a height variance, a landscape variance and a floodplain nodification on Lot C and Lot D, and the southwesterly 4 feet of Lot B, all in Block 5-8, Vail Vlllage lst Filing, 227 Bridge Street.Applicant: Hillis of Snonmass, Inc. and Bruce Ann & Associates. A request for an exterior alteration and a landscape varLance in order to construct an addition to the BelI Tower Building at 201 Gore Creek Drive, Part of Tract A, Block 58, VaiI Village 1st Filing.Applicant: Hermann Staufer - Lancelot Restaurant A request for a side setback variance in order to construct an addition to a single fanily structure 3-L/2 feet lnto the western side yard setback located at Lot 16' Buffehr Creek Subdivision, 1879 lteadow Ridge Roadlpplicant: Jerry Farquhar A reguest for a conditional use pemit in order to expand office space for a nagnetic resonance inaging system and a satellite dish at the vail valley lledical Center, Lots E and F, Vail VilJ-age 2nd Filing, 181 West Meadow Drive.Applicant: Vail Valley Medical Center A request for a landscape variance in order to provide two addifional parking spaces on the souttrern portion of Tract G, Vail Village 2nd Filing, 17 VaiI Road. Applicant: First Bank of Vail A request for a side setback variance at Lots 1-5, Block 5 Vait Vitlage 1st Filing, Unit 3B--Vail RowhouseE, 303 Gore creek Drive.Applicant: Stewart Colton A request for a condj,tional use pernit and a setback variance for a rernediation systern equipment building at the Alpine Standard Station, part of Lot A, Vail Village 2nd Filing, 285 s. Frontage Road lfest lApplicant: Amoco Corp. n | ,1 '.r I ' I \v lat ftJ/--t '' I tt lq Cb "//;,'-t ft-2 ry. 1. 2. 3. 4. 5. 6. 7. 8. 9. A request for a site coverage variance at Lot 31, Block 7,Vail Village lst Filing, 84 Beaver Dam Road.Applicant: H. Ross Perot 10. A reguest for an anendment to Town of Vail ordinance No. 24, Series of 1983 and ordinance No. 28, series of 1987 governing wood-burninq fireplaces, gas logs, and gas appliances.Applicant: Tordn of Vail 11. A reguest for a najor amendnent to SDD No. 15, part ofparcel A, Lionsridge subdivision, Flting 2. (The Valley Phase III)Applicant: Brad & susan TJossem L2. A request for a varlance fror tbo vall helEht reguirernent onI,.t 29, Block 1, vall Potato Patctr; 805 Potato Patch Drive.Appllcant: Patsy and Pedro Cerl-eola 13 A request for a rnajor subdivision, to approve theprelirninary plan, a reguest for a variance to the maximum height for retaining walls, and a reguest for a variance to the rnaxinurn percent grade for a road, on a parcel conrnonly referred to as Spraddle Creek, an aPproxirnate 40 acre parcel Iocated north and east of the Main Vail I-70 interchange and east of the Spraddle Creek livery.Applicant: George Gillett, Jr. 14. A request for a major aroendnent to SDD No. 4, Coldstream Condorniniuns in order to anend Sections 18.46.090 (B) density, 18.46.100 (B) floor area, 18.45.22o emp]oyee housing and 18.46.23o time reguirements to convert existing racquetball facility into an employee housing unit, management office, laundry and owner storage area at Lot 53 clen Lyon Subdivision, 1476 westhaven Drive.Applicant: Coldstream Condoninium Association. 15. A request to amend the Vail Municipal Code Section 18.04 to add a definition for a brew pub and a request to amend the Commercial Service Center Zone District 18.28 to allow a brew pub as a per:rnitted use.Applicant: Dean Liotta The applications and information about the proposals are available for public inspection in the Conmunity Developnent Department office. Town of vail Conmunity Development Department Published in the VaiI Trail on July 11., 1990. r. d' Appr ication ouru)q|r| ll: ,- l,- t. PEc MEETTNc oNE blbqllo FOR A VARIANCEAPPLICATION I.Thls wll l A. procedure ls requlred for any proJect requestlng a varlance. The appllcatlon not be accepted until all information {s submitted. NAME OF APPLICANT lnpt AooREss A/o d 2m $t7t B.NAME OF APPLICANT'S REPRESENTATIV ADDRES' k puow 47b - /.4/ c. NAME 0F ol.lNER(S)llor print) ADOilESS PHONE D.LOCATION OF PROPOSAL ADDRESS E. F. rE B THE F YOUR ,4a2\($toY dFmsr gE PROPOSAL. ,oro 4 cK #7- LEGAL nEscRrprroN tor fu etocKJL _Fr unc l/arl fdzfu fzhlt FROM PAIO 'SEFORE THE COI4i4UN ITY DEVELOPHENT OEPARTNENT }IILL ACCEPT A 'llst of the names of owners of all property INcLUDTNG pR0pERTY qEHIt'!0 AND AcRoss brREErs', THE AppLrcANT tlrLL BE RESporrsrsiE F0n-cosiEii II. A PRE-APPLICATION CONFERENCE t.lITH A PLANNING STAFF MEI,IBER IS STRONGLY SUGGESTEDT0.)oETERr'llNE IF ANI'ADoITI0NAL tHroarrniloH- ii xeEoLD.-Ho-ApFircAiiolr-irIi aEACCEPTED uNLEss IT-ls_coMPLqiq (ItusI tHiluoe nil-iiins REQUTRED By THE zoNrNG ^9!lN!llR4i9ll. -- II Is rHs Rppt- icANT' a nEiFoNlia ri iiv ro-unxe-An-npiijinirrenrHrTH THE 5TAFF T0 FrNo ouT Rsour nooriroHnr-lleHiiini nequrnEminri. -'"'' iblilinuiiiilillpi:ffii!:hlitii:i,'tbh,iT?5i!:ii:^lir,0ti^?xtiit?,Fii_r!ft.'AN0 ENVIROt{i"lEN1AL cor'lirlssloN uV-s'lrpuinrel -ALi-ioHotttons 0F AppRotlAL l'lusr BEcompLtED r.trTH BEFoRE A BUtLDTNG pin;rri-'ii-issuEo. --"- adjacent to the subJect property and their mai'ling addresses, MAILING AODRESSES. Snowdon and Hopkins o Architects 201 Gore Creek Drive 303-476-220'l Vail, Colorado 81657 uay 29, 1990 l.{r. }like ]tol1ica Town of vail Planning DePartment 75 South Frontage Road VaiL, CO 81658 Mike: As you and Pam discussed last week the appticant--is submitting an ippiication for a variance for Lo1, 29, nlock 1-, Vail Potato Patch, VaiI, Colorado to allow for an increase in a retaining wall height "Oo.t" 3 feet in the front setback as per section L8'58'020 of the supplernentary regulations of the Toldn of Vail Zoning Ordinance' As per secE].olt i8.54.02n, tlj-Ell,cloG ar-E-tr-oEFlf,.E a ltqB f'd lggai[fqt ng tn;Ig;;-;rf.!l 6-!-I f;tt td -rZ teo€ tn heiqltt on the ;;hfti--Ide of ine ier driveway. This request wiII allow the aiplicant to have reasonable (ea) drive access, and allow the house abiign to stay ritftit the required maximum height for residential construction. The najority o-r this waII would be hidden fron view by ;i;;fu the residence-betwlen the wall and nost public view areas' As can be seen on the site plan, there is a drop of 10 to 1-2 feet to just get to the 20 foot front-setback line. To then acconmodate a 20 to 24 ioot deep garage places the downhill.edge of the garage floor.slab 25 feet above naturai grade. By accessing the garage via the extended drive fron the easti we are iUte to drop that elevation bY L2 to 1"5 feet and make a reasonable design solution. These 3 lots along the ".,rrr. are probabiy the rnost difficult to access fron Potato Patch prive and is prolirty why they are so late in developing' Because the requested variance in wall height is hidden by the pi"p"r.a iesia6nce, it,s inpact on adjacent properties and the general iuuiic (risht , alr', etc. ) i3 minirnal. r hop- that Y?l,til]--?::-:lt=5r-"-n"ias6ip'on tiris property, not as granting special privileges to the applicant. Page 2 Mr. Mike MoIIica tqay 29, 1990 I hope this is adequate infornation to start the review process for pfC.' I arn hoping €frat this item can be placed on_ your regularly scheduled ,fune ZStn rneeting. Please catl if you have any questions or need additional infornation. Sincerely, SNOWDON AND HOPKINS - ARCHITECTS hmqftfuru,nlrt Craig N. snowdon Partner CNN/sth A r, r ^|} o M M r r M E N r I SCHEDULE A Application No. VLSL37-4 For fnfornation OnIy LOT 29 VAIIJ POTATO PATCH - Charges -ALTA O$rner policy $499.00raxcertitr -rorol- - ,li3:BB With your remittance please refer to V15137_4. 1. Effectlve Date: April 18, l99o at 8:Oo A.M. 2, Pollcy to be issued, and proposed Insured: rrALTArr Orirnerrs poligy $2SOTOOO.OOForm 8-1970 (Arnended- 1O_1Z_ZO) Proposed Insured: ITARCH, S.A., A PANAI,IANIAN CORPORATION 3 ' The estate or interest in the rand described, or referred to inthig Cornrnltment and covered--herein is: A Fee Sirnple 4' Title to the estate or interest covered herein is at theeffective date hereof vested in: N{JA, INC., A COIORADO CORPORATTON 5' The tand referred to in this connitment is described asfollowe: IPT 29' BroeK L---v-llL/porA'o pATcH' AccoRDrNG To rHE RE..RDEDpIAT THEREOF, COUNTy bF EAGLE; STATE OF COLORADO. ]AGE ]. A L r ^1" o M M r r M E N r SCHEDULE B-1 (Requirenents) The foll.owing are the reguirenents to be L. Paynent to or for the account of thethe full consideration for the est,atelnsured. Proper J.natrunent(s) creating the estate or interest to beinsured must be exetuted. and-duiy fired eor recoid, to-wit: RELEASE oF DEED oF lRusr DATED March 07, 1988, FRoM ANJA, rNc., A coLoRADoCORPORATION TO THE PUBLIC TRUSTEE OF EAGLE COUNTY FOR THE USE OF FIRSTBANKoF vArL To sEcuRE THE suM oF gr4o,ooo.oo REcoRDED apiii or,-rgiir, rN BooK481 AT PAGE 5I.4. SAID DEED OF TRUST I{AS FURTHER SECURED TN ASSIGNUENT OF RENTS RECORDEDAprll 01, 1988, IN BOOK 481 AT pecs srs. EVTDENCE SATTSFACTORY TO raND TrrLE GUARANTEE COMPANY THAT TJARCH, S.A. rs APANAI,'ANIAN QRPOR,ATION . I CERTTFTED coPY oF REsoLUTToN oF THE covERNrNG BoARD oF r.ARcH, s.A., APANN!'ANTAN coRPoRAIroN' (AUTHORrzrNG THE ExEcurroN oF THE NEcEssARyDocuMENTs) ' sArD RESoLUTioN MUsr BE pRopERLy cERirrrED By AN oFFrcER oF THECORPORATION WITH IHE CORPORATE SEAL AFFIXED. SAiO RESOLUTION MUST BESUBMITTED TO AND APPROVED BY I,AND TITLE GUARANTEE COMPANY BUT NEED NoT BERECORDED. EVTDENCE sABrsFAcroRy ro rHE coMPANy rHAT THE TERMS, coNDrrroNs ANDPROVTSTONS OF THE TOWN OF VAIL TRANSFER TAX HAVE BEEN SATISFIED. 'ARR,ANT' DEED FROM_IIIA. INC., A coLoRADO COR'ORATTON TO LARCH, S.A., APANAMANIAN CORPORATION CONVEYiNG SUBJECT PNOPENIY. THIS PROPERTY TS SUBJECT TO THE JOINT RESOLUTION AND NOTICE OF ENCUMBRANCEoF UPPER EAGLE VALLEY coNsoLrDATED sANrrATroN orsinrct AND vArL vALLEycoNsoLrDArED WATER DrsrRrcr nnConoeo JANUARY 1g, 1990 rN BooK 521 AT pAGE44t. TH' COUNTY CLERK AND RECORDERS OFFICE REQUTRES RETURNADDRESSES ON DOCUI.TENTS SENT FOR RECORDING! ! Application No. V15137-4 complied with: grantors or mortgagors ofor interest to be 3. 4. 5. 6. IAGE A L r ^3 o M M r r rr{ E N r SCHEDULE 8.2 (Exceptions)Application No. V15137-4 :l?'!-91_i:y, or policies to be issued witl_ contain exceptions to therorrowtng unreEs the same are disposed of to the satiiraction oi---the Conpany: 1. standard Exceptions 1 through 5 prlnted on the cover sheet. 5' TaxeE and assessnents not yet due or payabJ.e and speciarassessnents not yet certified to the tr6asurerrs otfice. 7, Any unpaid taxes or assessments against said. Land. 8. Liens for unpaid water and sewer charges, if any. 9. RICHT OF WAY FOR DITCHES OR CANALS CONSTRUCTED 8Y THE AUTHORITY OF THEUNTTED STA"ES As RESERVED rN UNTTED sTATEs PAiENT RECoRDED July t3, Lg3g,IN BOOK 123 AT PAGE 517 10. RESTRICTIVE COVENANTS, WHICH DO NOT CONTAIN A FORFEITURE OR REVERTERCI,AUSE, BUT oMITTTNG REsTRIcTIoNs, IF AN';- gilseo oN RACE, colpR, RELIGT9N,oR NATToNAL oRrGrN, As coNlArNED iN TNsTRUMENT nnconosD l,tarch 05, Lg?4, rNBOoK 233 AT PAGE 628 AND AS AMENDED IN INsTnUl.fnrvf REcoRDED septenber 24,I975t IN BOOK 241 At PAGE gso. 11' urrLrEY EASEI{ENT THTRTY FEET rN I4TrDTH ALoNG THE sourHERLy r,oT rJrNE oFsu&tEcr PRoPERTY As sHoI{N oN THE RECoRDED pu,i or vArL/poTATo pATcH. 12' EAsEllENTs, RESERVATToNS AND REsTRrcTroNs As sHowN oR RESERVED oN THERECORDED PLAT oF VAIL/PoTATO PATCH. 13. TERMS, CONDITIONS AND PROVISTONS OF THE JoTNT REsoLUTIoN AND NoTIcE oFENCIIMBRANCE oF UPPER EAGLE var,r,gv coNsolrDAino senrrarroN DrsrRrcr AND vArtvALr/EY coNsoLrDATED WATER DrsrRrcr REeoRDED Jawuenv ra, 1990 rN BooK 521 ATPAGE 441. NorEs uPoN EVTDENCE sATrsFAcroRy ro rHE coMpANy rHAr sArD ENcuMBRANcE HAsBEEN PAID IN FULL, SAID ExcEPTIoN 'TLL BE-ociiltnn. PAGE ALr^SoMMrrr,rENr a SCHEDULE 8.2 (Exceptions) Application No. V1S13Z-4 PAGE 3 sNowDoN & HoPKrNs ol|,rra* 201 Gore Creek Drive vArL, coLoRADO 816s7 LETTil @F TRANSNNIT]TAL the following items: tr Specifications TO il D Plans E Samples WE ARE SENDING vOU ! Attached D Under separat€ cover via tr Shop drawings b coot of letter pl erints tr Change order coPrEs DATE NO.DESCRIPTION 4 q liq lls /fufu. t/lrut 4 I I hrLtlsu Pt'.J. --)r' /1.**-I 5lt4l'ln ./,/o/lrt-t krn fr"/f I 5/i4/q o I 7fu rhrt z.n'* z+zn l; azh r1., /4/ ii /4t 4 W' /,/'4iq"I ffi ltww ttiltvvtfu)p I firlfq"I lrle*L i4 'qlzs I / THESE ARE TRANSMITTED as checked below: I For approval ! For your use ! As requested .b For review and comment tr FOR BIDS DUE Approved as submitted Approved as noted Returned for corrections E Resubmit-copies for approval ! Submit-copies for distribution E Return -corrected prints ! tr tr tr 19- D PRINTS RETURNED AFTER LOAN TO US rnooJoraoz /@,E. gd. k ol|7l tl andoautaa aaa not aa rlo',ad, hrndly arolt lt ata at onca. 1. 2. 3. 4. 5. PUBLIC NOTICE NoTfCE IS HEREBY GIVEN that the Plannlng and Environmental Conmissl-on of the Town of VaiI will hold a public hearing in accordance with Section 18.66.050 of the municipal code of the Town of Val.l on June 25, 1990 at 2:oo p.m. in the Town of Vail Municipal Building. Consideration of: A r€quest for an exterior alteratlon and a landscape variance in order to construct an addition to the BeIl Tower Building at 201 Gore Creek Drive, Part of Tract A, Block 58Vail Village 1st Filing.Applicant: Hermann Staufer - Lancelot Restaurant A request for a conditional use peroit to allow for a Bed and Breakfast at Lots 5 and L/2 of 5, Block 5, Vail Village Seventh Filing, 1119 E. Irtarmigan Road. Applicant: Monie s. BeaI A request for a conditional use per:mit to atlow for a Bed and Breakfast at Lot 8, Block 3, Eighorn Subdivi.sion, sth Addition, 5198 Gore Circle.Applicant: John and Paula Canning A request for a conditional use permit for a construction staging area, located just uphill of the Golden Peak snowrnaking punphouse, Tract B, VaiI Village 7th Filing. Applicant: Vail Associates, Inc. Prelininary review for an exterior alteration in Commercial Core f, for the following property (60 to 90 day study period) : Covered Bridge Building - Lot C and Lot D' and the southwesterly a feet of Lot B, all in Block 5-B, Vail VilLage lst Filing, 227 Bridge street.Applicant: HiIIis of Snowmass, Inc. A request for a variance fron the wal1 height requirement on r-ot rg, Block 1, Vail Potato Patcht 8o5 Potato Patch Drive. Appllcant: Patsy and Pedro Cerieola A reguest for an amendrnent to the Townrs zoning code to addItTelevision Stationrr as a conditional use in the Conmercial Core II zone district, Section 18.25.010Applicant: Vailr/Beaver Creek Television Network. A request for a conditional use pemit for a deck expansion at the Sweet Basil restaurant, Iocated on Tract A, Block 58, vail village lst Filing, 193 East Gore creek Drive. Applicant: Kevin Clairer/Chuck Rosenquist 6. 7. 8. %b&/,A a-lor^/ Gt<r',.p-a *, 6A/qo 9. A request for an amendment to SDD No. 23, VaiI National. Bank, Part of Lot D, Block 2, Vail Village 2nd Fiting, 108S. Frontage Road West. Appllcant: VaiI Natlonal Bank Building Corp. 10. A request for a side yard eetback variance at 4247 ColunbineDrive, unit #20, Bighorn Terrace. Applicant: John Nilsson 11. A request for a front setback varl.ance and a creek setback variance for Lot 6, Vail Village l{est, Filing No. 2, L755 I{est Gore Creek Drive.Applicant: Dan and Karen Forey L2. A request for a conditional use petnit and a height variancein order to construct an antenna at the Vail Municipalbuilding, 75 South Frontage Road.Applicant: Tohtn of Vail Police Departnent 13. A request for a major subdivision, a request to approve theprelirninary plan, a reguest for a variance to the maximum height for retaining walls, and a request for a variance to the maxinum percent grade for a road, on a parcel connonly referred to as Spraddle creek, an approximate 40 acre parcel located north and east of the uain Vail I-70 interchange and east of the Spraddle Creek livery.Applicant: George Gillett, ilr. 14. A reguest for a work session on the Sonnenalp remodel and proposed Special DeveloPment District at 2o Vail Road, Partof Lot L, Block 5-8, Vail Village lst Filing.Appllcant: sonnenalp Properties, Inc. The applications and information about the proposals are available for public inspection in the Conmunity Developnent Department office. Town of VaiI Connunity Development Department Published in the vail Trail on June I' 1990. olnlN I ,hlyunl fu,f*\ :lul U,llor! I ,VFF i llall , Johrn nd $huvrfu 5hl,rrio )ohn fionor lfloohonia buw\ PA J ,l'ilt n ,ftloak I ,VfF o porlar,bwv4wn ",,n(.0! hti 'LTtfi ' l/ail tl,sl u ,Vlook I louo\,1^ M , 'v(r ' uilq ,khvrl,tlvsg 1Qw0 n( ,fvzol h ,blooV I , VFF . Vi'l hq'oti"fus,lw . P n. ftlt,1 \lirl , hlpyv), slbql lwuw,, , h,vrsola Yuiltwo (Vr+ r,q, plt I I Vff ) l1t sE o DtrFHRTMtrNT @FE@MMUNITV DtrVtrL@FMENT TXXXXXX :ALEs AcroN FORM XXXXXXX I o department of community developmentbox 10O vail, colorado 81657 1303) 47&s613 February 5, 1982 A'l l en Tafoya Ruof f -Wentworth Arch i tects 500 Lionshead Mall Vail, Colorado 81657 RE: DRB Submitta'l of 2-3-82 Dear Al'l en: At the February 3 meet'ing of the Design Review Board ' your submittal for a primary/secondary residence was approved as submitted with the following stipulation: if the majority of planted trees die in the next 2-4 years, they should be rep'laced. Approval was for a primary,/secondary residence with a total GRFA of 4553 sq.ft.: 3762 sq.ft. primary and 791 sq.ft. secondary. Sin Peter Jamar Town PJ:df P'lanner Project Appllcation Project Name: Proiect Description: Contact Person and Phone Owner, Address and Phone: Architect, Address and Phone: Btocr / , p;;;1n Com ments: Design Review Board Motion by:&)o/4N Seconded by:(oO- a.z/+l) /--x-:I APPROVAL \ -/ CI''J.,4tl DISAPPFOVAL +-o I F_to Aod z249 dLA E statt Approval !l ti J, ,. Project Application 4,- II Project Name: Project Description: contact Person and "no"" h f Xl u,lF+StloaT H Owner, Address and Phone: Architect, Address and Phone: Lesar Description, tot 71 , atocx f , ,u,"n Po'T4TO P4lfA Com ments:Alv f I DrSc H€t4 lD tet/6.20vJ DA LdT t-A L-ou) - 4e5 F f f Lr.\) \, Otr 7u./o At->O A gLq /5 /.6 (L/^r\e 4t Z-3 4N t4 .2E €. - Tpetf- Ft€4z3tz-s r+-t4T lldust: P>ES NOT FtT grr€. aa?a.a-4tt. Design Review Board 7N4T 4PzucAPT H4s GEE{ H''CL84 t Io". //6// ?L Motion by: Seconded by:(oa-Loo4k) /sA pla/za)AL- I Sum mary: -t-1, olo 4 -J AJ,f (P,ovf , n.rr4>}f N) ( Sxtovtofxt , a*ttva'; , <o+corz'<p , Prrarr) o€(so E statt Approval lnwn 75 3oulh tronlage rd. vall, colorado 81657 (303) 476-7000 department of community development January 12, 1982 A11en Tafoya Ruoff-Wentworth Archi tects 500 Lionshead Mall Vail, Colorado 81657 Dear A1 'len : At their January Board disapproved on Lot 29, B'lock 1, the application did 6, L982 meeting the Town of Vail Design Review by a vote of 4-2 your application for a residence RE: DRB Submittal of 1-6-82 Potato Patch Subdivision. The Board found that not meet Section 18.54.0108 of the Town of Vail Municipal Code -- specifically "to ensure that the location and configuration of structures are visual'ly harmonius with their sites and with surrounding structures and do not unnecessari'ly block scenic views f,rsn existing building or tend to dominate the townscape or natural Iandscape." You have a period of ten days from the meeting date jn which to fi'l e and appeal to the Town Council in writing. If you have any questions, please contact me. Si ncer Peter Town PJ:df Jamar Pl anner i\,i' Project Application Projecl Name: Project Description: Contact Person and Phone Owner, Address and Phone: Architect, Address and Phone: atocx / , eitins Design Review Board / //1 "^," /z//a/vt / A" 'l/ m< /rt*rn*t- / / ftr4. ayr *t"r Sum mary: /o lvoT frizrr E statt Approval ) box 100 uail, colorado 81657 (3031 47Ss613 November 24, 1981 Allen Tafoya Ruoff-Wentworth Archi tects 500 Lionshead Mall Vai'l , Co]orado 81657 Peter Jamar Town Planner PJ:df department of community development RE: DRB Submitta'l of 11-18-81 Dear Al]en: At the November 18 meetjng of the Design Review Board' your submitta'l for a primary,/secondary residence was given preliminary approval with the following stipulations: receive Public Works ab'prova'| , show correct retaining wall elevations, submit roof siinple and provide more landscaping. Approval_was a primary/secondary residence with a total GRFA of 4553 sq.ft.: 3762 sq.ft. primary and 791 sq.ft. secondary. Project Appllcation Proiect Name: Projecl Description: Contact Person and Phone Owner, Address and Phone: Architect. Address and Phone: Legal Description, ao, Cl 7 , Btocx / , pl1ing For+7tt ftz+, Zone Comments: Motion by://rTit,{t seconded or, //PE( Design Review Board Ilt o^" /r /Ff 6 t /t DISAPPROVAL {-J Summary: Amt o^*, il f ftf {, Staff Approval \oo Strauss R esidence Oo -..:--..-.,.-:,: LC.l Nl_i:]: I ri t-1..i Potato Pat-c29 512. sq. ft., 4 Floor New Du lex Residenc T:c foTJor''1;g infori;riion is rcqu i:-eC jor sut;j::: lc:r be !:\'cr: 7l''pe cf .rj:::: i a j b;' rhc epnlicani to the Des:gr i.-.-r^ Col or !:;:d beiore ,"|. .Li.,l j--rl.'r fioSi n:_ir -- r,.- .t .t a fir:a! a:-l:-cr.a1 t,':-;: I. I c iiaie:ials Fasc ia lirn ci ow s iii-n d ow Trin Doors llard o:.Deci: F,ai 1s FJrroc Fl asi:ing_s C:: i:r e.','s T:'a-cl. El;c.1 cslr:9s Gre:nh cus es Cther PLr'iiiT i iA.TEt I.r.i,S (i'eg e: e t il e, Lanisca;:r:g E ct a,--' i c al liane Flat Concrete lllA ran with Btack (ilW\rh STO 8616 €rt r R iver Rock Fireplace Wood Olympic 908 Wood Olympic 908 Pella Clad Dark Brown None t,, Metal with qlass Not known at thjs time Wood to match Pella Windows Steel Pipe Rails 4pt. flue to be Pratt 6 LambertY399P Silver Mink Calvanized sheet - painted to mafChmetal adjacent material River Rock Warm Grey Trash room inside 9arage N/A Pool deck to be pavers, retaining wails to be STO to match house color and river rock to match fireplace. ll^', eri al _c il:ciuc:rg Tri-es, Cc:;:c;r l\ian e See Landscape an d Gl-ound Cor.er) Plan /Site c'- -.,'- - uaiit i i\- Plan Warm Grey llil to ,oProject Application October 19 l98l Project Name: Strauss Residence Project Description: 4336 Sq. Ft. Duplex Residence Contact Person and pnone Ruoff /V'lentworth Architects A.l.A.. P.C. 500 Lionchead l!'iall Vail- Colorado Owner, Address and Phone: lt"il r F- It'lrs Richard StrarrsE 109 Pascack Road. Pearl River. New York 10965 Architect, Address and Phone: Ruoff /Wentwork Architects A.l.A.. P.C. 500 [ ionshrracl turall Vail . Colorado 81657 ( 303) 476-3051 Legal Description: Lot 29 , Block I , Filing potato Patch Commenls: dential two far,rily , zone U.i!u4-sccondary resi- Rgquest Preliminary Review Design Review Board - t ,I D^1" ///#f/ I'l Motion by: Seconded Dy: FLf /rtTt oo fo t I t Lot Arca &3 llear -Rcqui rcC l5' proposecl I'latercculsc-requirccl N/"'proposed GRFA: . GRFA: A] 'loued . zot{[ ctllrtK forsfl, R, n P/s zoiir DrsTnrcTs & 756 Prin'r), - /g 36, Secorrc;ary Legal Description: totoftatorx ,l- otnt 671?fuSS nrchi.,.:cct Zone Distri rt 4y'k -p.oporoa L,I Lot Arca __d_5/^lrZEJleisht Al'tou...cl igi proposed S. setbacks: Front-Reqriiiba zor'--pro'pbseo C2WA/ ro tr€arrlr- Sides-Requircd .l5, proposed _ Z6-, .Primary A1lor.red Secondarl, ir'l'l or'ied Si te Ccvcra ge : A'l 'l oi.re cl Pro pos e C Pro i;cs cd Propcs e d 3 7ez--77-F .:.a< Landscaping: rant'lns: . Requit'ed Requi red Drive: S3"ope I>cy.rnittecl %Slope Envjronniental/llazar.ds: .Avi.lanche Flood Plain Conncnts i !' t; Ii i'lin9 Proposed M-oK -Proposed d {n P Proposcrl €^ Propl;: r:d Actual . 'Siope 7o:r i r:lr1 l).il r.: oo T RANSMITTAL ro 6lr-r- ANo(4...:S R uof !?t?e 11 [vL'c i' l[.r Arch ite cts *: :*{i'ir A f A We Are Sending: For Your: The Following: Herewith S lnformotion fi) Prints $o Shop Drowings Requisitions ( Letters () ) RECORD //DATE lt /3//81 JoB No. SoSl JOB TITLT STRAUSS RESIP€IVCE- Under Seporote Cover ( ) Use () Action () ( .) Specs ( ) Cuts Photogrophs ( ) Photostots () () COPIES )-DESCRIPTION -S ITL Pl r.st REMARKS AIA Tronsmitto ARCHITECTS, o \t ENGINEERING CHEEK LIST Subdivision Lot Bl ock Fi'ling 1. Submittal Items (A) Topo MaP (s) site Ptan (c) utility Plan (D) T'itl e Report(fi SuUO:uision Agreement (jf applicable) 2. Enqineerinq Requirements .A (A) culvert Sjze(si o.: verr'ay GradFlET-max)- 3. Source of Utilities (Acceptabl e)(tlot Acceptaut e) n)ot Jl/as 7..t tr (A (B (c (D (r (F El ectri c Gas Ser+er l,la te r Tel eplrcne T. V. t't-' 4. Corrunetrts : Approved: iz-frs/e/ D'i sapproved: *HW Bill Andrc:':s r r ' | '/'; \ ).1 -'1r:-ej*: 232- e"cr3t .Joab--r. 1,4" ^ 4" /" 711,.2 Srecz' i 13 {z 62./re //rl --'r/Hz- (J uTlLllY LOCAI'ION VIjl(Il:lc^Tlp 6eNwaw1w SUI}DIVISION Potato Patch JOB NAME Strauss Residence 29 FILINC Vail Potato P"t.h ADDRESS The locatjon of utilities, whether they lines, nust be approved and verified by accompanf ing site Plan. Uountain Bell Westem Slope Gas Public Service ConPanY Holy Cross Electric Assoc. Vail Cable T.V. Upper Eagle Valley Water and Sanitation District Vail, Colorado 81657 be nain trunk lincs or ProPosed the following utilities for the Date /z -za'8/ 0 3TE: T'hese verifications do not reiieve the contractor of his responsibitity to obtain a street cut Permit fron the Town of Vail, Departnent of Public lVorl"s and to obtain utility locations before digging in any public right- of-way c,r easernent in the Towr of Vail. n'O',i ii 014 ti I I * U, *.r O tit:HF:t)Ut-.fi A Apgr't i c: *t i crn No , V0tlli,$31/: For Irtl:ct"trr+t i r:n 0rr l.g '- tlh arge s ". 0wner f:'i: I i r:: g " l'0IAl.. '" - hlith qnui'r'xrtrritt*trce please r*{sn to Vtl0{J331d" i. It'l'*cdiv* Datei 0C1'0P.E.ii {]&, 19[]1 at {l;0{l A,f'l . :.:. l;'crl icrJ to he issued, arrd ;rrnp$s*d Insnredi "i:ll.Tfit' 6urn,*l'.':; l:'6l icr,; l'll,l) Fcrrrr B- 1?7tl (Alrended 10- 17- 7tl) Fr^cpcs*d Insured I T0 *Ii [rETEftfl].NED :5 " Th* estate ar i nterest i rr the l and descr ibed nr re{'erned tc} in th i s l.lgrnar i Lrn*n{ ancl c over*d h,ere i i,r i s: A f:I:[: 4. 'f itl* t,o ihe egtate or int.*r^*s{:. cov*r''ed lrer'* in is al, the *irf ectiv* dai,e h*r'*af uest,erl in: ttlf:HfiRD [. $TFAU$!i *nd L:Aft0l-INE [." $'IflAU$$ i..] . 1h* lsncl r*ferr*d to in this {jorrirrr itrotrnt is d*!ir:: rihed as followsl l-0T :r9 BL0cl{ I, vAlL./PoTAT0 PATCH, ACcoF{tJIN$ 10 1}iE fiECoRDED F',LAr 1'lJLft{:0}', {)0lJNlY ot-' li"A6l,..E: 7 $IAIL: 0F C0l-0tlAD0. o',f ; c $ r,r r I r ri r N r O {Ir:ll{":t}ur.F l}- L ( fi*qu i ren*rrtsi, ) A;,p l i c at, i on itlo, UfiOtl331,6 Th* f s11r:N ing *r* Lhe r*,:iu ir*rn*nts tc he r:orrr;:1 i*d w it,h;l, f:'agtrt*nt 'Lu ct^ far ihe account af the qr^antclns rrr rrr c r- t,,; a 91o r s of the 'Fu11 c ons i cjEr;rt i r:n '[ar the *state or int*r'*st, tr: he insurrerJ, l, [:'r'crp,gy' instruil*nl{:;) c; r*eting the *statre ur intere:;t tc be insur*d trti.tst he ex*cut*iJ and dt.tLg fi1*d for record, to-'r^r it: 3. UriFiriANTY DF-HD Ffl0fl FfICHARD F". fiTrrAU$ti and CAf{0t,. 1il[. f:, $rRAU$$ I0 10 FL: Dl-:Th.llllINED [0NU[:YINti $IJBJ{:UT Ftt0PERl'Y. ilO'IH: TIII$ F.BOPIIiTY I'IAY ItE SUBJHCT'IO lIIE IIHAL L,$TA'TT lTIANSF'IR'TAX Il,7 VIRTlJ[ 0l'INI]LtJSI0N IN l'HE T0tdN 0rr VAIL. $'L.EAUE {l0NlACf THH l'Ot'lN 0i: vAIL. t.0tr .iArIi A$$E$$nENT. A'ra; fio**rlrruNTO t:,'IHIDULE Ll-;l {Exceptiorrs) Ap'pl icat.iorr Na. V00U3316 The pal icg t:r po1 ic i,rs to b* isst,t*d r,r i 11, cnntil in *xc*pt ions to th*followinq unless the sene ere dispo*ed of to th* satisfaction of the {Jt:trtpeng: 1, Fitanr.'iard lixcep't ions I through 5 6rr inted crn the r: over sheet. 6. Tareg and ass*rssrrr*ntg nat g*t, rJu* nn p,argahl e *nd sp*r:ial assess,$ents not g*t, cerf i.Fi*cl t,o the TneasuFer.'s of f icei. 7 . Ang unpa id ta;.les cr assessre ent s aga i nst Ee i ct I errd " fl . l-iens for unpaid uat*n anrl se pr charges, if arrg" 9. RIGHl'!3 OF t.'AY f:OR DITCHE$ OR f,ANAI".$ CONTiTRUCTED BY THE AUTHORIl'Y OI: Tt{H UNI TTD $TATI $, A$ f{HSjF-IrVt.0 I N UNI TED SjI ATES F'ATEN'r RECoRDED AUrilJ$T 15, 19J5, rN B00K 93 AT FA$L: :17{t" 10. l{[riTr{]c'tI0Ngi, t,,|t{IcH tt0 N0T fl0NTAIN A F0[rFIITURE 0R frHUtit{'ILn ct-AUsiH, auT 0f,lITTIN$ ttH$TltIcTI0N|], Ir ANy, p.AliID 0N r{AC[, t:0t.0R, R[:L.ISI0N 0R NATI0NAt- 0RItiIN, A$ C0t'tTAINE0 IN IN$Tf(Ufir.NT frIC0fi0Ir0 fiAltC].1 05, t9/4 IN B00H ?.1.J AT PAGI 6tB AND AIIEHDED IN IN:!TRIJf'IENT REI0FDED srlPTEtlB[:R74, t?75 IN !r00K ?41 AT FAGE t5tl. TT" UTII-. ITY C.A5E.f{EN'T I1{] TFHT IN IdIDTH ALONU T}IE 5OU1'HEI?L.Y LOI'LINE OF' SUII,IECT F'ftOFERTY A$ SHOI.'N ON T},lt: RECORDIiO T.I.A1' Of: UAIL/T,OTATO T,ATCH. | | rFgn'tL{dOL't-[.t TRANSMITTAL RECORD TO Town of Vail - Design Review Board DATE October 19, 1981 75 S. Frontage Road JOB NO.#8031 Vail, Colorado 81657 JOB TITLE Strauss Haus Attn: Peter Jamar We Are Sending: For Your: The Following: Herewith (X) lnformotion ( ) Prints (X ) Shop Drowings Requisitions ( Under Seporote Cover Use ( ) Action Letiers () Specs() () Phoiosrophs() ) ( (x ) ) Cuts () ( .) COPIES . DESCRIPTION Photostots REMARKS 2 copies 2n Application List of Materials 2tl Zoning check 2n 2n Soils Report Site Plan 4tt Floor Plans 4 I' SectionsI copie Topographic Survey Alle RVOFF/ WE HAR OS,AIA ()Copies of \ Above To:Tronsmittol Only ( RUOFEAENTWORTH ARCHITECTS, AIA ZON ING CHECK Strauss Residence #8031 Lot 29, Block 1, Potato Patch Subdivision '| 8.13.020 Zone: Two Family, Primary/Secondary Residential District 18.13.030 r 8. 13.040 r 8. 13. 050 Conditional Uses: NiA Lot Area 15,000 sq. ft. 23,422 sq. ft. F ron ta ge 30 feet 147.22 feet 80 feet square easily enclosed Accessory Uses: Lot Area 6 Site Dimensions: Setbacks: Front East Side West Side Rear Height: Private swimming pool, Patios Minium Actual Required Ptolo*q__-f6.- ----20-- (see special requirements 18.69.050 L) 18. 13. 060 18.13.075 18. 13. 080 18. 13. 090 18.13.110 18. 13. r 20 l5l l5l l5t 171 l6l gg' Allowed Propoqed --- 3T 321 Density Control : (see special requirements 18.69.050 J) Site Coverage: (see special requirements l'8.69.050 E) Landscaped Area: Minium Proposed 1a, oss. 2- sq. ft. TE, -zzo sq . tt. Parking:Required Proposed 4 spaces 4 spaces ( 2 enclosed) 18.69.050 Special Restrictions for Sites in Excess of 40? Slope 18.69.050 A. Soils t Foundations Chen 6 Associates lnvestigationr 5080 Road 154 Job #16,455 Clenwood Spring, Colorado 81601 (copy enclosed) 19.69.050 B. Foundation Design: Richard Weingardt Consult, Inc.- 1575 Sherman Street - 3rd floor Denver, Colorado 80203 ( 303) 839-s722 ta ZONE CHECK CONIT Strauss Residence #8031 '18.69.050 C- Topographical Survey: Richards Engineering 18-69-050 L. Front Setback:Required Proposed As set by DRB 20' None required on garages Job #V8-224 P.O. Box C-100 (copy enclosed) Avon, Colorado 81620 (303) 949-s072 18.69.050 D. Building Design: Ruoff/wentworth Architects AlA, PC 500 Lionshead Mall Vail, Colorado 81657 (303) 476030s1 18.69.050 E. Site Coverage: Allowed ProposedStructure 3,sT3-E-. ft. TJio s+ rt. Parking 2,342.2 sq. ft. 342 sq. ft' 18.69.050 F. Grading 6 Drainage: Ruoff,/wentworth Architects AlA, PC 18.69.050 G. Cut 6 Fill Plan: Ruoff/Wentworth Architects AIA' PC 18.69.050 H. Revegetation Plan: RuoffiWentworth Architects AlA, PC 18.69.0s0 l. N/A 18.69. 050 J . DensitY :Allowed Proposed rbtal cnrR 4,sgZ-E. ft. E;336:3Fsq. ft. Max. Secondary 1,530.73 sq. ft. 679.64 sq. ft. -18-69.050 K. Parking Enclosed: Required Propgsed 22 o ch en and associates, inc. CONSULTING ENGINEERS 96 S. ZUNI . DENVER, COLOBADO 80223 1924 EAST FIRST STREET ' CASPER' WYOMIHG 301[ s rouxDAT|oX tlrGlxIInlxG Uheeler 6 P iper, oo82 East Beaver P. 0. Box F-100 Avon, Co I orado Subj ect !?601 , 1978 303/ 7a4-7 t 05 307 | 23.-2126 July 3l ieaslbi llty StudY for a Prooosed Res idence and Genera I Subsol I Cond lt lons , Lot 29, Block I ' Potato Patch Subd iv I s ion, Va I | , Eagle CountY, Colorado. Job No. 16,\55 Arch ltecrs Creek Bou levard 8t620 At t ent I on :Hr. Duane Piper Dear Ouane: 0n June 5, 1978, we vlsired the slte to determlne access for a backhoe whtch would be utillzed to excavate test plts for a soll and foundatlon tnvestls"ii"i. Because of the very stecP_slopes (approxl- ;;;i;'4; p"i"""it-on rhe stte, lt would be very dtfftcutr to eain access to the proposed rcsldential area wlth a track-npunted backhoe' Such access tay involve rough earthuorl" on the lower porglon of the s I te. 0n July 28, 1973, the undersigned performed a-surflcial reconnai ssance of the slte to determlne if construct ion ls feasible with resPect to slope stabllity and to obtain a general idea of the subsoi I conditions. The reconna t ssance conslsted of observlng the condition of the existing s lope, and nearby sol I cxposurcs; performlng a sei smlc 3urvey cons lst lng of tr*o selsmlc I Ines, s hor*n on Fi9' l; and ievlewlng the results of a soll and foundat ion investlgatlon which we.prevlously performed on the '| ot lnmedlately south of th! subject sl te (Lot 13) ' Site Conditlons: The slte is presently vacant and located on a verY steep---------south-ractng stoPe near the upper and northern edge of the Potato Patch Subdlvlslon. veget.at lon consists of dense growths oi sagebrush' grass' ;..;, "id " u".y-furr-"rp"n ir."r. A few scittered boulders up to 2 feet in d lameter are partlally exposed on the ground surface' The slope aDDears to be In a stable condition, displaylng no slgns of wet or humr,ocky g round. granular s lopewash solls conslstlng of cl.ayey.:"nd tl3 ?t:Itl wlth some cobblcs and boulders. The seismic surveyi' tnatcate that the densities oi ttrese deposlt3 are verf erratic' The upper, less dense materla'l ls g"n"."lly on the order of'8 feet thick, but ls appreclably deeper ln some places. This less dense materlal may conslst. predomlnantly of ;i;;.; sand whl lc the underlylng, more dense materlal probably contalns larger arnounts of cobbl es and boulders' The test pit excavated for the soll and foundatlon lnvestlgatlon at Lot 33, to the sourh of the subject slte, encountered very hard sandstone bedrock at a depth of about ll ?eet below the ground surface' The ,.irri" survey ior Lot 29 dld not reveal that competent sandstone bedrock ;;;-;linfi no.""t foundarlon depths at thls slte. However, lf the s"ndstorr. bedrock is extremely iolnted, the sheQr wave velocitY through tho bedrock would be t"i.tiu"i'-slow and ln the range of that for solls' Therefore, it i, " porribillty'lhat bedrock may be encountered at foun- datlon grades but probably would not requlre blasting' Whcclor t Pl Por ' Archltects July 3l , 1978 Page 2 Proooscd Conslructlon: Wc understand that ghe proposed resldence ls to ffirety downs lope of rhe existlng roadway. The iorna"tlon will be srepped downs lope and it is anticlpated that cuts into the slope wlll be'on the order of B feet deep or less. The resi- dence wl ll be of wood frame construct lon and convent ional resldential typeloadsareexpected.ltisalsoplannedloggls!ructaswIr'rrnlng pool adjacent to the residence. Founda! i on wal I other ret e in Ing pressure wh ich ar least 4$ pcf General Subsoil Conditions: Based on nearby exposures ' the subsolls In ffisldence orobably conslst of predomlnantly pi.i itrnary des lgn of'tf,e proposed rcs ldence' The foundat lon should be insp.ct.d irlor to constructlon ln order to observe subsoll and bedrock condltions and final lze foundatlon dcsign The general design Parameters arc as fol lows: (l) The resldencc mey be founded wlth spread footlngs placcd on the. naturalso|lsorbedrock.Spreadfootlngsshouldbedeslgnedfora naxlmum soit uu"rin! p'.,.ut" on the ordir of l'000 to 4'000 psf' The f Inal maximum soll bearlng pressure may be determined from an inspec!ion of the foundat ion excavat ion' The lower Pressures should be ut il lzed lf appreclable anrounts of porous clays err e present In the subsoi I s ' s on the ucslope Portlons of the forrndation and r.ralls should be designed to reslst lateral earth should be based on an equivalent fluid prcssure-of . Foundat ion and reEainlng wal ls should be welI construct lon Reconrnenda t i ons : Based on the observations nade durlng,our iiiffiour experience In the area, we recommend that the fol Iowing dellgn and constructlon parameters be utll lzed for excava t i on the crlteria. o Vheclor c Plier, Archltects Jufy 3t , 1978 Page 3 drained to prcvent the bulldup of hydrostat lc pressure in back of the walts. Excavatlons In!o the natural solls should be kept as shallow as pos3ible and should be llmited ln length to mlnlmlze disturbance to the steep slopes. Temporary cu! slopes should be stabIe ?t InctinatIons of up to l:1, but w| || sIough when exposed to weathering. (3) The swinrming pool and thc lower floor levels should be prot'ected with underdralns. (4) lf flll ls regul rod benearh floor slabs, lt should conslst of a nonexpans ive, granular soll. Tha flll should be compacted to at least 95? standard Proctor denslty at optlmum molsturc content-and should not contaln cobblcs greater than 5 Inches In dlaneter. Vegetat lon ghould be stripped and rclatlve'ly level bcnches cut into steep slopes prior to flll placement. A A-inch layer of free dratnlng gravel shduld be provlded beneath the floor slabs and bencath the swimrnlng pool. These I ayers ghould connect to the underdra i n g rave I (5) lr ls extrernely important that good surface drainage be provided around the restdence to prevent surfage water from Infl ltratlng into backflll soils. Landscaplng which requlres large arnounts of lrrlgation should be discouraged for thlg lot. The introductlon of more than naEural anounts of molsture lnto the subsoils may reduce s lope st€bi litY. lf there are any questlons, or if we can be of further service' olease let us know. Slncerely, CHEN AND ASSOC IATES , INC. flJ P/med Rev. By: R. Enclosure By 6v.:1.3i{.0(;iua'"""{?l fter$ '2,42<,4 | ,t tlr' ( I tl .it il l- | t.1 'iu f ll I Scale: ltr-20 l - &,r'o Prcbable Area .-or Housc -t'' /