Loading...
HomeMy WebLinkAboutB12-0445 - CR1 - 091912 COMCHECKProject Title: Swoon Retail Space Report date: 09/18/12 Data filename: Page 1 of 2 Generated by COMcheck-Web Software Interior Lighting Compliance Certificate 2009 IECC Section 1: Project Information Project Type: Alteration Project Title : Swoon Retail Space Construction Site:Owner/Agent:Designer/Contractor: 122 E Meadow Dr Vail, Colorado 81657 Laurie O'Connell 970-376-0401 laurie_oconnell@hotmail.com Sarah Wyscarver SRE Building Associates PO Box 6376 Vail, Colorado 81658 970 845 6359 sarah@srebuilds.com Section 2: Interior Lighting and Power Calculation A Area Category B Floor Area (ft2) C Allowed Watts / ft2 D Allowed Watts (B x C) Swoon Retail Space (Retail)1600 1.5 2400 Total Allowed Watts =2400 Section 3: Interior Lighting Fixture Schedule A Fixture ID : Description / Lamp / Wattage Per Lamp / Ballast B Lamps/ Fixture C # of Fixtures D Fixture Watt. E (C X D) Swoon Retail Space (Retail, 1600 sq.ft.) Halogen: Recessed: 3" Recessed Light / MR-16 50W 1 23 50 1150 Track Lighting: Track: Current limited track w/ cfl la Wattage based on current limiting device capacity 0 0 0 720 Halogen: Sconce: Wall Sconce / MR-16 50W 1 7 50 350 Compact Fluorescent: Chandelier: Fluorescent Cahandelier / Spiral 13W / Electronic 4 3 52 156 Total Proposed Watts =2376 Section 4: Requirements Checklist Interior Lighting PASSES Lighting Wattage: q 1.Total proposed watts must be less than or equal to total allowed watts. Allowed Watts Proposed Watts Complies 2400 2376 Passes Controls, Switching, and Wiring: q 2.Daylight zones under skylights more than 15 feet from the perimeter have lighting controls separate from daylight zones adjacent to vertical fenestration. q 3.Daylight zones have individual lighting controls independent from that of the general area lighting. Exceptions: q Contiguous daylight zones spanning no more than two orientations are allowed to be controlled by a single controlling device. Project Title: Swoon Retail Space Report date: 09/18/12 Data filename: Page 2 of 2 q Daylight spaces enclosed by walls or ceiling height partitions and containing two or fewer light fixtures are not required to have a separate switch for general area lighting. q 4.Independent controls for each space (switch/occupancy sensor). Exceptions: q Areas designated as security or emergency areas that must be continuously illuminated. q Lighting in stairways or corridors that are elements of the means of egress. q 5.Master switch at entry to hotel/motel guest room. q 6.Individual dwelling units separately metered. q 7.Medical task lighting or art/history display lighting claimed to be exempt from compliance has a control device independent of the control of the nonexempt lighting. q 8.Each space required to have a manual control also allows for reducing the connected lighting load by at least 50 percent by either controlling all luminaires, dual switching of alternate rows of luminaires, alternate luminaires, or alternate lamps, switching the middle lamp luminaires independently of other lamps, or switching each luminaire or each lamp. Exceptions: q Only one luminaire in space. q An occupant-sensing device controls the area. q The area is a corridor, storeroom, restroom, public lobby or sleeping unit. q Areas that use less than 0.6 Watts/sq.ft. q 9.Automatic lighting shutoff control in buildings larger than 5,000 sq.ft. Exceptions: q Sleeping units, patient care areas; and spaces where automatic shutoff would endanger safety or security. q 10.Photocell/astronomical time switch on exterior lights. Exceptions: q Lighting intended for 24 hour use. q 11.Tandem wired one-lamp and three-lamp ballasted luminaires (No single-lamp ballasts). Exceptions: q Electronic high-frequency ballasts; Luminaires on emergency circuits or with no available pair. Section 5: Compliance Statement Compliance Statement: The proposed lighting alteration project represented in this document is consistent with the building plans, specifications and other calculations submitted with this permit application. The proposed lighting alteration project has been designed to meet the 2009 IECC, Chapter 8, requirements in COMcheck-Web and to comply with the mandatory requirements in the Requirements Checklist. Name - Title Signature Date