Loading...
HomeMy WebLinkAboutDRB120468 APPLICATIONDepartment of Community Development 75 South Frontage Road Vail, CO 81657 Tel: 970-479-2128 www.vailgov.com Development Review Coordinator Application for Design Review Changes to Approved Plans General Information: This application is for all changes to approved plans prior to Certificate of Occupancy. An application for Design Review cannot be accepted until all required information is received by the Commu- nity development Department. Design Review approval expires one year from the date of approval, unless a building permit is issued and construction commences. Submittal Requirements: 1. Three (3) copies of all pertinent approved plans with illustrated, labeled changes 2. Joint Property Owner Written Approval Letter, if applicable. Fee: $20 ______ Single Family ______ Duplex ______ Multi-Family ________Commercial Description of the Request: ____________________________________________________________ ___________________________________________________________________________________ Physical Address: ____________________________________________________________________ Parcel Number: ___________________________(Contact Eagle Co. Assessor at 970-328-8640 for parcel no.) Property Owner: ____________________________________________________________________ Mailing Address: ____________________________________________________________________ ___________________________________________ Phone: _________________________________ Owner’s Signature: __________________________________________________________________ Primary Contact/ Owner Representative: _________________________________________________ Mailing Address: ____________________________________________________________________ ___________________________________________ Phone: _________________________________ E-Mail: _______________________________ Fax: _________________________________________ For Office Use Only: Cash___ CC: Visa / MC Last 4 CC # _________ Exp. Date: ________ Auth # _________ Check # ___________ Fee Paid: __________________________________ Received From: ___________________________________ Meeting Date: ______________________________ DRB No.: ________________________________________ Planner: ___________________________________ Project No: _______________________________________ Zoning: ____________________________________ Land Use: ________________________________________ Location of the Proposal: Lot:________ Block:________ Subdivision:_______________________________________ ✔ MinormodificationstotheapprovedPhaseIplansfortheGeraldR.Ford Amphitheater 530SFrontageRoadE,Vail,CO 210108100002 TheTownofVailandtheVailValleyFoundation 75S.FrontageRoad,Vail,CO81657(TownofVail)and90BenchmarkRoad,Suite300 Avon,CO81620(VVF)(866)650-9020and(970)777-2015 JackHunn,HunnConsultingGroup 970-390-4537 jackhunn@yahoo.com 1 Bill Gibson From:David Baum <davidb@zehren.com> Sent:Tuesday, September 25, 2012 1:17 PM To:Warren Campbell Cc:Bill Gibson; Pedro Campos; jack@hunnconsultinggroup.com Subject:GRFA Phase I: DRB Change to Approved Plans Attachments:120925 GRFA DRB Binder.pdf; 120925 GRFA DRB application.pdf Warren: I spoke with Bill Gibson regarding this DRB submittal at the end of last week, hopefully he provide some advance notice that this email would be forthcoming. When we spoke, Bill mentioned that he would make every effort possible to get this item included on the October 4 meeting agenda. As I am sure you are aware, construction has started at the GRFA, so these are time sensitive issues, and we truly appreciate your facilitation of this submittal while Bill is out. We recently met with the Foundation on the site and several modifications to the design were suggested. The attached documents reflect those changes. Highlights include: 1. A scaled down renovation of the Lawn Seating area. The DRB previously approved a more dramatic and impactful solution, however the design team and the Foundation have determined that there is value in preserving the existing, mature landscape that exists between the athletic fields and the seating area. We have revised the design to preserve that area to the greatest extent possible, and the revised sheet LS106.2 reflects that change 2. We are also proposing to move the newly proposed East Restroom building approximately 9’-6” further northeast than previously shown. This change was actually recommended by the DRB during our original review session, but at that time we hoped to preserve the Borgen Plaza area and decided not to incorporate that change. Upon further development of East Betty For Way, this became possible, and the Foundation determined that additional space was desired in front of the East Service building. This change is reflected in sheet A106.1. 3. After color mockups were installed on site, it was determined that the amphitheater would like to renew the color of the stucco that is currently installed. Rather than selecting a color to “match existing”, we are now proposing a warmer tone for the stucco, to match Benjamin Moore HC-80. Sheets 106.3 and 106.6 reflect this change. 4. Sheet A106.6 reflects changes that were discussed with the DRB as originally to be included in Phase 2 at the GRFA; we are now requesting to bring this scope into Phase I. The replacement of the existing stainless steel countertops and the introduction of copper paneling below the new countertops will be an application of the East Restroom as improvements to the existing East Service, West Service and Concessions buildings. 5. Finally, we intend to clad the existing exposed concrete walls at the back of the covered seating areas with a thin stone facing and stone cap. This material will be Colorado Buff Sandstone with a honed face; the cap will also have a cleft edge. This stone will be sealed as it is located in high traffic areas. The stone previously approved for the East Restroom building is also thin set Colorado Buff Sandstone. This work is reflected in Sheets A106.9 and A106.10. This process is slightly complicated by the fact that the original application submitted and the DRB approval received as part of the package that included both the upper bench improvements at Ford Park as well as the lower bench improvements at the GRFA. Please let me know if we need to re-submit an application as part of this process or if additional information is required. Thanks again for working with us on these issues. Best regards, 2 David Baum Architect, LEED AP _________________________________________________________ Zehren And Associates, Inc. Architecture Planning Interiors P.O. Box 1976 Avon, CO 81620 ph (970) 949-0257 fax (970) 949-1080 www.zehren.com Davidb@zehren.com skype: david.baum.zehren