HomeMy WebLinkAboutB12-0516 . --- � /
- -
— - ---- -- _- _- - - _
__ --- — -- ---
01-07 2015 Inspection Request Reporting ,�� age
4'�-- ----- — - - v�-�fl--CiiY_�-
Requested Inspect Date: Thursday January 08 2015
Site Address: 75 S FRO�ITAGE RD�V VAIL
VAIL GOLF COURSE NEAR#7 TEE BOX/CART PA
A/P/D Information
Activity: 612-0516 Type: COMBO Sub Type: ACOM Status: ISSUED
Const Type: Occupancy: Use: U Insp Area:
Owner: VAIL COLORADO MUNICIPAL BLDG
AUTHORITY
Contractor: VAIL RECREATION DISTRICT Phone: 970-477-5264
Description: GORE CREE STABILIZATION PROJECT NEAR THE#7 TEE BOX/CART PATH
Requested Insuection(s)
Item: 542 PLAN-FINAL Requested Time: 08:15 AM
Requestor: VAIL RECREATION DISTRICT Phone: 970-477-5264
Comments: 390-9731
Assigned To: GRUTHER Entered By: JMONDRAGON K
Action: Time Exp: _
Item: 90 BLDG-Final Requested Time: 08:30 AM
Requestor: VAIL RECREATION DISTRICT Phone: 970-477-5264
Comments: 390-9731
Assigned To: J NDRAGON Entered By: JMONDRAGON K
Action: Time Exp: ____
�- +�l`� K`,�� ���ro�
���� �� � � � � �� � �
�
� � ��
Inspection HistoN
Item: 70 BLDG-Misc.
Item: 542 PLAN-FINAL
Item: 90 BLDG-Final
REPT131 Run Id: 14847
IVOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
,�.����,
,
��
...... z
'�^4��t;;4-rifi;>.-�
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
COMBINATION BLDG PERMIT Permit #: B12-0516
Project #: PRJ12-0569
Job Address: 75 S FRONTAGE RD W VAIL Applied.....: 10/05/2012
Location......: VAIL GOLF COURSE NEAR#7 TEE BOX/CART PA Issued. . . : 10/17/2012
Parcel No....: 210106400003
OWNER VAIL COLORADO MUNICIPAL BLDG 10/05/2012
75 S FRONTAGE RD
VAIL, CO
81657
APPLICANT VAIL RECREATION DISTRICT 10/05/2012 Phone: 970-477-5264
700 SOUTH FRONTAGE ROAD
VAIL
CO 81657
License: C000003313
CONTRACTOR VAIL RECREATION DISTRICT 10/05/2012 Phone: 970-477-5264
700 SOUTH FRONTAGE ROAD
VAIL
CO 81657
License: C000003313
Description:
GORE CREE STABILIZATION PROJECT NEAR THE #7 TEE BOX/CART
PATH
Occu anc U Type Construction: V Valuation: $55,000.00
P Y�
..tx,t.����,.�..y-.,���.._�..,,-.,.�.+����.,t.�..,,,.�.�x�....,..,�..,.... FEE SUMMARY
�„-..,,�.,,-��,�,,,�,,���..,,...,,,,�,��,,,.-..,-.t:.-.,,-.�,,,...,,,,,>,,-,..„
Building Permit-----------> $678.75 Bldg Plan Check----------> $441.19 Use Tax Fee-----------------------> $900.00
Electrical Permit---------> $0.00 Elec Plan Check-----------> $0.00 Restuarant Plan Review--------> $0.00
Mechanical Permit------> $0.00 Mech Plan Check---------> $0.00 Additional Fees-------------------->$2,024.94)Plumbing Permit
--------> $0.00 Plmb Plan Check---------> $0.00 Recreation Fee--------------------> $�.00
In�nestigation----------------------> $0.00
Will Call------------------------------> $5.00
TOTAL PERMIT FEES--------------> 30.00
Payments-°------------------------°--> �0.00
BALANCE DUE-------------------°---> b0.00
�,-�,..�_�,��.<_.�»,>�.�.-..,.�.�,t.�x..t...=...=..t��.���.....,�.,,...�>.�.,.�..,�..,...��,��r.����>�.-.��..�.�,-.,.�...�.+�..���.-�,-..t....-..�..,���„�t,�...........,,-...
DECLARATIONS
I agree to comply with the information and plot p�an, to comply with all Town ordinances and state laws, and to build this structure
according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and
other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149
aR AT OUR OFFICE FROM 8:00 AM - 4:00 PM.
combination permit_012811
�,^,,.,._ .�,,,�s.
°��. .' � ��.
������.� �`���. �._
CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF
Permit#: B12-0516 Address: 75 S FRONTAGE RD W VAIL
Owner: VAIL COLORADO MUNICIPAL BLDG AUTHORITY
Location: VAIL GOLF COURSE NEAR#7 TEE BOX/CART PA
Cond: 0
(PLAN): DRB approval does not constitute a permit for
building. Please consult with Town of Vail Building
personnel prior to construction activities.
Cond: CON0012842
The applicant shall plant all new vegetation in informal,
natural looking groupings.
combination permit_012811
��
, �
.....: •.� �.
���� ���
���������***���.������**�����*#����**������*#�����**������*�����***��#�*����������**���*��������*����***�����**����,:�����������**�*����������*����*��
REQUIRED INSPECTIONS AND STATUSES
Permit#: B12-0516 Address: 75 S FRONTAGE RD W VAIL
Owner: VAIL COLORADO MUNICIPAL BLDG AUTHORITY
Location: VAIL GOLF COURSE NEAR#7 TEE BOX/CART PA
***�����**��**�**����*****��***����*�*���***����***�*�*�***�***����***�*�**����***��<**�**���*,:�,*�***��***���***���***�*��*��*,***��**�**���***��**�
Item: 00070 BLDG-Misc.
Item: 00542 PLAN-FINAL
Item: 00090 BLDG-Final
combination permit_012811
Department of Community Development
75 South Frontage Road
TOWN OF VAIl.' vai�, co s�s5�
Tel: 970-479-2128
www.vailgov.com
Development Review Coordinator
BUILDING PERMIT APPLICATION
(Separate applications are required for alarm &sprinkler)
Project Street Address: Project#: d''�1 �02 ' ���9
1278 Vail Valley Drive (golf maint.) ^�D(� - -
Number Street DRB#: cSJ�J �p� ' ��.'�.��.
( ) ( ) (Suite#)
Building/Complex Name:
#7 Tee Box Stream Bank Building Permit#: ��02 - ��� l�v
Contractor Information Lot#: Block# Subdivision:
Business Name: Vail Recreation District
700 South Fronta e Rd East Work Class: New(Qj Addition((�jj Alteration (�
Business Address: 9
City Vail State: CO Zip: 81657 Type of Building:
Contact Name:
Scott F. O'Connell Single-Family�j Duplex(Qj Multi-Family((�jj
Commercial(� Other�j stream bank stabilization �
Contact Phone: �970)390-9731
Contact E-Mail: soconnell@vailrec.com Work Type: Interior� Exterior� Both f�
I hereby acknowledge that I have read this application,filled out Valuation of
in full the information required,completed an accurate plot plan, Work Included Plans Included Work
and state that all the information as required is correct. I agree to Electrical �Yes �No QYes �No
comply with the information and plot plan,to comply with all Town j
ordinances and state laws, and to build this structure according to Mechanical �Yes Qi )No QYes �No
the town's zoning and subdivision codes, design review ap-
proved, International Building and Residential Codes and other Plumbing �Yes �No �Yes �No
ordinance the Town a
Building �i Yes QNo �Yes QNo 55000
X �-�—ro Value of all work being performed: $ 55000
Owner/Owner's Representative Signature(Required) (value based on IBC Section 109.3 8 IRC Section 108.3�
Electrical Square Footage �
Applicant Information Detailed Scope and Location of Work: bottom of#7 cart
Applicant Name: Scott F. O'Connell on Vail Golf Course, Install boulder retaining walls to I
Applicant Phone: �970)390-9731 stabilize stream bank and prevent further erosion.
Applicant E-Mail: soconnell@vailrec.com Project included Gore Creek diversion structure,
Project Information Excavation of site and post construction reveg.
Owner Name: Town of Vail
Parcel#: Unplatted o1 1 D � ^�(py ' �[��-3
(For Parcel#,contact Eagle County Assessors Office at(970328-8640 or visit
www.eaglecou nty.us/patie)
(use additional sheet if necessary)
For Office Use Only: Date Received• � � � �
Fee Paid: ' O
Received From:
Cash Check# ���' 2 g 2Q1
CC: Visa/MC Last 4 CC# exp date: ��c��P�
Autn # TOWN OF UAIL
12-Mar-2012
� � H Hepworth-Pawlak Geotechnical,Inc.
P 5020 County Road 154
�'e�� Glenwood Springs,Colarado 81601
` Phone:970-945-7988
HEPWORTH-PAWLAK GEOTECHNICAL Fax:970-945-8454
email:hpQeo@hpgeotech.com
September 25, 2012
Vail Recreation District
Attn: Scott O'Connell
700 South Frontage Road East
Vail, Colorado 81657
soconne�vailrec.com
Job No.110 052A
Subject: Subsurface Exploration for Proposed Bank Stabilization below 7TH Tee
Box, Vail Golf Course, Vail, Colorado
Dear Mr. O'Connell:
As requested, Hepworth-Pawlak Geotechnical, Inc. performed subsurface exploration
near the proposed stream bank stabilization area at the subject site. The study was
conducted as additional services to our agreement for geotechnical engineering services
to Vail Recreation District dated March 12, 2010. The data obtained and our
recommendations based on the subsurface conditions encountered are presented in this
report. We previously performed a subsoil study for grading of the 7�'Tee Box and
presented our findings in a report dated March 30, 2010, Job No. 110 052A.
Proposed Construction: The proposed stabilization consists of a two or three tier
stacked boulder slope with a total height between roughly 10 to 15 feet. The stream bank
stabilization will be about 100 feet in length and located below the cart path. The site is
shown on Figure 1. The final effective slope is proposed to be roughly 2 horizontal to 1
vertical with temporary cuts of 1(h) to 1(v) for construction of each tier. Cut depths are
expected to range between about 2 to 6 feet. Transition slopes to the ends of the stacked
boulders will be graded at 3 horizontal to 1 vertical. The on-site alluvial soils are
proposed as backfill behind the stacked boulders where needed. The existing cart path is II
proposed to remain in place.
If construction conditions are significantly different from those described above, we
should be notified to re-evaluate the recommendations presented in this report.
Site Conditions: The 7Th Tee Box is located on the south side of Gore Creek and north
of Vail Valley Drive. The cart path is located below the tee box near the top of the stream
bank. Vegetation along the river bank consists of scattered evergreen trees, brush, grass
and weeds. The ground surface slopes steeply down from the cart path to Gore Creek.
Several layers of sand bags have been placed along the river bank at the proposed
stabilization area in an effort to limit stream bank erosion.
Parker 303-841-7119 • Colorado Springs 719-633-5562 • Silverthorne 970-468-1989
- 2 -
Subsurface Conditions: The subsurface conditions at the proposed stabilization area
were evaluated by drilling one exploratory boring at the approximate location shown on
Figure 1. The log of the boring is presented on Figure 2. The subsoils encountered,
below about 2%z feet of man-placed fill, consist of 2%z feet of loose silty sand overlying �
medium dense to dense, silty sandy gravel with cobbles. Results of gradation analyses
performed on samples ofthe sand and gravel (minus 1 1/2 inch fraction) obtained from
the boring are presented on Figure 4. Free water was observed in the boring at a depth of
7 feet at the time of drilling. The upper soils were generally moist. The natural soils
encountered at the 7�'Tee Box consisted of silty sandy gravel similar to the gravel soils
encountered in the boring for the current study.
Conclusions and Recommendations: The natural gravel soils encountered in the
exploratory boring at a depth of 5 feet should be adequate to support the stacked boulder
slope. The existing fill, silty sand and loose disturbed soils encountered at the bearing
level within the excavation should be removed to provide bearing on the undisturbed
natural, relatively dense gravel soils. The stability of the natural gravel soils can be based
on an assumed moist unit weight of 130 pcf, buoyant unit weight of 80 pcf, internal
friction angle of 34° and cohesion of zero. We expect that the dry natural soils can be
excavated at a 1 horizontal to 1 vertical temporary slope for placement of boulders.
Dewatering and a flatter cut slope will probably be needed below creek level.
Backfill should be placed in uniform lifts and compacted to at least 95%of the maximum
standard Proctor density at a moisture content near optimum. Required backfill can
consist of the on-site alluvial soils devoid of vegetation, topsoil and oversized rock. Prior
to backfill placement, the subgrade should be carefully prepared by removing all
vegetation, topsoil and loose silty sand soils. Structural fill should be benched into slopes
that exceed 20% grade. Permanent unretained cut and fill slopes should be graded at 3
horizontal to 1 vertical or flatter and protected against erosion with rip rap or other means.
Limitations: This study has been conducted in accordance with generally accepted
geotechnical engineering principles and practices in this area at this time. We make no
warranty either express or implied. The conclusions and recommendations submitted in
this report are based upon the data obtained from the exploratory boring drilled at the
location indicated on Figure 1 and to the depth shown on Figure 2, the proposed type of
construction, and our experience in the area. Our findings include interpolation and
extrapolation of the subsurface conditions identified at the exploratory boring and
variations in the subsurface conditions may not become evident until excavation is
performed. If conditions encountered during construction appear different from those
described in this report, we should be notified at once so re-evaluation of the
recommendations may be made.
This report has been prepared for the exclusive use by our client for design purposes. We
are not responsible for technical interpretations by others of our information. As the
project �volves, we should provide continued consultation and field services during
construction to review and monitor the implementation of our recommendations, and to
verify that the recommendations have been appropriately interpreted. Significant design
changes may require additional analysis or modifications to the recommendations
Job No.110 052A
GecPtech
- 3 -
presented herein. We recommend on-site observation of excavations and foundation
bearing strata and testing of structural fill by a representative of the geotechnical
engineer.
If you have any questions or if we may be of further assistance, please let us know.
Respectfully Submitted,
HEPWORT - PAWLAK GEOTECHNICAL, INC.
Louis Eller
Reviewed by:
J'EN��� pq�2
rf,,,r......
.. Q��'y �y �
Steven L. Pawlak, P. '��,�, a 6 2�2 ��
. �s
LEE/ksw �►��,��/��,��
l,�l���A��P�O '
attachments Figure 1 —Lo ploratory Boring '
Figure 2—Log of Exploratory Boring
Figure 3 —Legend and Notes
Figure 4—Gradation Test Results
Figure 5 —Boulder Wall Detail
cc: River Restoration- Dan Woolley(dan.woolle�(a�riverrestoration org)
Job No.110 052A
Gec�tech
�
� ��
� O
D � N �
� s k
� � l
Z -}- �
1 �
11� �
r
'` N
� ]
/`
��
�O
2
j�
GORE�REEK �'�
��
� BORING 1 /
• �
. � �
—�_� �_�� �' 'T 10 FLOOD LINE
�P P�N
� � — — ' � � GP� p5
� � ,a2
_ _ — � � _ �
��h6' — _ _ _ — ^� _ _ _ — —
8215- - `- - - - -' - - - - - - 8210
8226- -' — � - - - -
) � - - - - - - - - - - - - 8215
� - - - - - - - - - - - - - - — 8220
� � 5
� — ' � � �i _ _" - - - - - - - - - - - - 822 �
_ _ — _ _ '
- - - - - - - - - - - - - - - 8230
BORINGI - - -- - - - - - _ _ _ _ 8235
7thTEEBOX � - - - - _ _
— _ _ _ 8240
BORING4 BORING3 / � � - - -. - - - - _ ` \
O � ,� � 8`�`'�S
BORING 2 /
/
/
LEGEND:
• BORING FOR CURRENT STUDY.
O BORING FOR PREVIOUS STUDY. APPROXIMATE SCALE
1" = 30'
110 052A ~
C"a@C7t��Ch LOCATION OF EXPLORATORY BORING Figure 1
He worth—Pawlak Geotechnical
BORING 1
ELEV.= 8204'
0 0
6/12
APPROXIMATE CREEK WATER LEVEL
5 � 46/12 5
� � � WC=7.4 �
� : +4=55 a�
� ' �
� = 0'� -200=7 ,
� s
o- '• Q
p .4• 42/12 0
10 +4=38 10
-200=14
15 15
NOTE: Explanation of symbols is shown on Figure 3.
110 052A C�~�Ch LOG OF EXPLORATORY BORING Figure 2
He worth—Powlok Geotechnical
LEGEND:
� FILL; organic silry sand above silry sand and gravel, loose, moist, mixed browns.
SAND (SM); silty, gravelly, loose, moist, brown.
� � GRAVEL(GM-GP); slightly silty to silty, sandy,with silty sand layers, scattered cobbles, medium dense to dense,
.:. moist to wet with depth, brown, subrounded rocks.
� Drive sample; standard penetration test (SP�, 1 3/8 inch I.D. split spoon sample,ASTM-1586.
42�12 Drive sample blow count; indicates that 42 blows of a 140 pound hammer falling 30 inches were
required to drive the SPT sampler 12 inches.
— Free water level in boring at time of drilling.
NOTES:
1. The exploratory boring was drilled on September 17, 2012 with a 4-inch diameter continuous flight power auger.
2. Location of the exploratory boring was measured approximately by pacing from features shown on the site plan
provided.
3. The exploratory boring elevation was obtained by interpolation between contours on the site plan provided.
4. The exploratory boring location and elevation should be considered accurate only to the degree implied by the
method used.
5. The lines between materials shown on the exploratory boring log represent the approximate boundaries beiween
material rypes and transitions may be gradual.
6. Water level readings shown on the log were made at the time and under the conditions indicated. Fluctuation in
water level may occur with time.
7. Laboratory Testing Results:
WC = Water Content(%)
+4 = Percent retained on the No. 4 sieve
-200 = Percent passing No.200 sieve
i'.
��'
i
' �+7@�"',C7t�@Ch F i u re 3
110 052A LEGEND AND NOTES 9
He worth—Pawlok Geotechnical
�'• ! �,
.� �"�
11 11 1 1 � • •3 . • : —__—_�_ ��
•1 � I �����������������=�������������
1 ��������� ��������� ������������
�������������������������������������
������������������������������������ •�
� ������������������=���������������
���������������������������������
��������������� �������������� ����� :�
� ��������������������������������������
� ���������������—���=��s�����������
����=�=��������������������������� �
� ������������������������������=���
����������������
��������—��� ������������ '
• '� � �������������������������������� •
� ������������������������ii�����������
���������������� ���������������
1 ������������������������������������
��������������������i������ ������ '
���������������������������������������
��������������������������������� •� �
� •1 ���������������������������������������
��������� ���������������� �
� ��������������������������i����������������
1 ���������������=�����������������
��������������������������������
��������������������������������������
������������������������������������ �
:1 ■=��=����������=�������������������
�������������-�=.��������������������
����������� �������
������������������������=����������� �
����������
�� ������������������������������������
������������� ����—�����������������
�����������
��������������������������������� �
11 ��������������������
,� �
�� �� ��• � • �
� � �� .��
� �
••'
� �����
� � � �
. � :
.
■ � �
� �
� '� :• •
� � � •
�'�
. ,,-. � •.
.�
, • .1 . . � 11 • 11 ' � ' � • . • ��.���������� 11
� � ������������������������ �������������
��������������
������������������������������������������
���������������������� ������������ •1
1 ���������������������������������������
���������������—��������������������
����������������������������������������
����������������������������� :1
�����������������������������r�������
� �������������������������������
,,,,� � ������������������������������I����������
-�������������=-���
�-����������='I������� �
� �-����=������i�������
�-=���-���=-��������
'� - --����� �-���� •/ •
� --�----�--���-
--����--��-�-����-=��
�-�-����---�--A-�
, --���������������=��� ,
����������=�����r ����
����=�- �����
� .1 ��������������.�� �������s������ 1 �
��������������������������� �������
�����������������i����������������� �
�������������������=�����������
� -������������=���������������������� �
� ������������ ������������
������������������������� ���������
��������������.���������������
�������������������������������� 1
:1 -�����������������������������������
�����������������������������s����
������������������������������������
�������������i������������������������� 1
���������������������������������
•1 ���������=��������������������������
:, ���� �������������������
� �����������������������������������
������������������������������������ 1
11 ����������������������
11 11 11 1�• 1 • 1 1 � 1
11 .11 • • � 1
� •
•••
• �����
. � . �: ♦ � � �
� �
� � � � �
� � � � . • �� :• • �
� � . � • � � I
11 . - u - �'
�
�K�
Ia
�os��
01-07-2015 Inspection Request Reporting Page 5
4•17 nm Vail, CO - C�#v Qf
Requested Inspect Date: Thursday January 08 2015
Site Address: 75 S FRO�VTAGE RD 1�V VAIL
VAIL GOLF COURSE NEAR#7 TEE BOX/CART PA
A/P/D Information
Activity: B12-0516 Type: COMBO Sub Type: ACOM Status: ISSUED
ConstType: Occup ancy: Use: U Insp Area:
Owner: VAIL COLORADO MUNICIPAL BLDG
AUTHORffY
Contractor: VAIL RECREATION DISTRICT Phone: 970-477-5264 •
Description: GORE CREE STABILIZ,4TION PROJECT NEAR THE#7 TEE BOX/CART PATH
Re uested Ins "'�---
Item: 542 PLAN-FINAL Requested Time: 08:15 AM
Req estor: VAIL RECREATION DISTRIC Phone: 970-477-5264
Comm s: 390-9731
Assigned o. Entered By: JMONDRAGON K
Action Tim Exp: � . � 1 ��
C�.�
Item: 9 DG-Final Requested Time: 08:30 AM
Requestor: V IL RECREATION DISTRICT Phone: 970-477-5264
Comments: 390-9731
Assigned To: JMONDRAGON Entered By: JMONDRAGON K
Action: Time Exp:
Inspection Historv
ftem: 70 BLDG-Misc.
ftem: 542 PLAN-FINAL
Item: 90 BLDG-Final
REPT131 Run Id: 14847