HomeMy WebLinkAboutB12-0193 REVDepartment of Community Development
75 South Frontage Road
TOWN OF VAIL ` va�i, co s�ss�
Tel: 970.479.2128
- www.vailgov.com
- — Development Review Coordinator
�_ _
TRANSMITTAL FORM
Use this form when submitting additional information for planning applications or building permits.
This form is also used for requesting a revision to building permits. A two hour minimum building review
fee of $110 will be charged upon reissuance of the permit.
Application/Permit #(s) information applies
to: Attention: Q Revisions
� Response to Correction Letter
612-0193 Building Department
�attached copy of correction letter
(� Deferred Submittal
�`! (() Other
Project Street Address:
302 Hanson Ranch Road 401
(Number) (Street) (Suite #)
Building/Complex Name: Mill Creek Court Building
Applicant Information
(architect, contractor, owner/owner's rep)
Contact Name: George Shaeffer Construction Co.
Address: PO Box 373
City Vail State: CO Zip: 81658
Contact Name: �on Stevenson
Contact Phone: 970-331-4538
Contact E-Mail: Jons@gsconco.com
I hereby acknowledge that I have read this application, filled out
in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to
comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according
to the town's zoning and subdivision codes, design review ap-
proved, Inter tional uil �ng and Residential Codes and other
ordinan the li ble reto.
X
Own wner's Representative Signature ( equired)
For Oftice Use Only:
Fee Paid:
Received From:
Cash
CC: Visa / MC Last 4 CC #
Authorization #
Check #
exp. date:
Description of Transmittal/ List of Changes, Items Attached:
-- Revised Architectural Plans for Storage Loft Railing
-- Added Structural Engineering Plans for the Storage Loft Railing
-- Revised Structural Engineering Plans of the Sub Floor
& Storage Loft Framing
(use additional sheet if necessary)
Building Permits:
Revised ADDITIONAL Valuations (Labor 8� Materials)
(DO NOT include original valuation)
Building: $ �250
Plumbing: $ �
Electrical:
Mechanical:
Total:
$0
�0
$1250
Date Received:
�, c������
OCT . p� 2012
� �'. a,flRM �'�-
I TiaWn� C.�� `��.I�.