Loading...
HomeMy WebLinkAboutB12-0535 ASBESTOS TEST REPORTHERRON™ Enterprises USA, Inc. Phone (303) 763 9639 Fax (303) 763 9686 E-Mail Lennie.Herron@comcast.net Hazardous Materials*Mold*Asbestos*Lead Paint Website www.HERRON-Enterprises.com Environmental Services*Industrial Hygienists 7261 W. Hampden Ave., Lakewood, Colorado 80227-5305 HERRON™ Project No. 0926125 Limited Asbestos Building Inspection Page No. - 1 October 01, 2012 Copyright © 2012 HERRON™ Enterprises USA, Inc. All Rights Reserved. October 01, 2012 SRE Builders/Mr. Steve Elicker HERRON™ Project No.: 0926125 Job No.: Verbal Location: Units 635 and 640, 133 Vail Rd., Vail, CO 81657 Date(s) of Service: September 26, 2012 – October 01, 2012 Services Requested: Environmental Consultation/Limited Asbestos Building Inspection Per your request, and under the guidelines defined, HERRON™ Enterprises USA, Inc. (HERRON™) has concluded the Environmental Consultation/Comprehensive Asbestos Building Inspection at the aforementioned property. Local, state and/or federal regulations, including but not limited to AQCC Regulation 8 (State), 29 CFR 1926.1101 (OSHA), 40 CFR Part 61 EPA (NESHAP), and 40 CFR 763 EPA (AHERA) may require a comprehensive asbestos inspection prior to a renovation or demolition. This inspection requires an AHERA and State certified asbestos building inspector identifying and sampling any friable and non-friable asbestos containing materials which could be affected by the activity. HERRON™ was contracted by the Client, to perform: 1. Units 635 and 640, 133 Vail Rd., Vail, CO 81657 is a renovation a. Limited to locations of the submitted instructions and/or renovation/demolition plans, only. Any locations/materials not specifically identified are assumed to be a Regulated Asbestos Containing Material, and should be inspected prior to any activity which may disturb the materials; i. Refer to materials identified in the report; White Medium Textured Drywall Walls and Ceilings, throughout Unit 640 Bathroom White Swirl Textured Drywal Walls and Ceilings, Unit 635 Bathroom Beige Trowel Textured Drywall Walls, Unit 635 Hall ii. Non-destructive bulk sampling; iii. 1 Day Turnaround PLM Analyses; iv. It was expressly advised that although this is a Limited Asbestos Building Inspection, it is a limited inspection which is designed to indicate the presence of Asbestos Containing Materials in the Building(s), and under normal the guidelines defined, specific samples and locations have been instructed and authorized by the Client. Although some materials may indicate that Asbestos is not present in this report, and under the protocol of limited sampling whereas not ‘all’ suspect materials were sampled, under local, state and/or federal regulations, including but not limited to AQCC Regulation 8 and OSHA 29 CFR 1926.1101, a certain protocol for sampling, number of samples obtained, and assessment is required. HERRON™ was subsequently contracted by the Client, to perform: 1. Not applicable; HERRON™ Enterprises USA, Inc. Phone (303) 763 9639 Fax (303) 763 9686 E-Mail Lennie.Herron@comcast.net Hazardous Materials*Mold*Asbestos*Lead Paint Website www.HERRON-Enterprises.com Environmental Services*Industrial Hygienists 7261 W. Hampden Ave., Lakewood, Colorado 80227-5305 HERRON™ Project No. 0926125 Limited Asbestos Building Inspection Page No. - 2 October 01, 2012 Copyright © 2012 HERRON™ Enterprises USA, Inc. All Rights Reserved. Thank you for the opportunity to be of service. Should you have any questions or comments regarding this report, please do not hesitate to call HERRON™ Enterprises USA, Inc. Sincerely, Billie J. Herron-Lusk Project Manager HERRON™ Enterprises USA, Inc. Certified Asbestos Building Inspector(s): Billie J. Herron-Lusk (Project Manager), Robert A. Longmire Assumptions, and Limitations This Environmental Consultation is applicable in whole, not in part, to the entire contents of the document. HERRON™ and this Environmental Consultation make no representation or assumptions as to past and/or future conditions/occurrences of the specific area(s) inspected. The results, conclusions and/or recommendations expressed in this Environmental Consultation are based solely on the conditions which were observed at the time of this Environmental Consultation. HERRON™’s inspection incorporated non-destructive sampling techniques and visual inspections in areas which were visible/accessible. Conditions and/or materials which were not inspected and/or commented on may very well differ from those which were inspected and/or commented on. HERRON™ selected sample locations and frequency of sampling based on observations, your requirements and/or the assumption that like materials in the same area are homogeneous. HERRON™ has specifically designed this Environmental Consultation for Client use in the location and identity of Asbestos Containing Material (ACM), and under no circumstances is this Environmental Consultation to be copied, used as a bidding tool and/or used for the development of an Asbestos Abatement Specification document without the express written permission of an executive officer of HERRON™. HERRON™ is not responsible/liable for any opinions, conclusions and/or recommendations as provided by others based on any means presented in this Environmental Consultation. With use of Environmental Consultation, and/or use of any services offered by HERRON™, Client(s) agrees that HERRON™ has been given the authority by the Owner(s) of a property to enter the aforementioned premises, perform the services, utilize any and all floor plans, blue prints, etc., and agrees to indemnify, hold harmless, and defend HERRON™, its Officers, Employees, Assigns, etc. for any and all claims, costs or damages that may result from services contracted, etc. HERRON™ Enterprises USA, Inc. Phone (303) 763 9639 Fax (303) 763 9686 E-Mail Lennie.Herron@comcast.net Hazardous Materials*Mold*Asbestos*Lead Paint Website www.HERRON-Enterprises.com Environmental Services*Industrial Hygienists 7261 W. Hampden Ave., Lakewood, Colorado 80227-5305 HERRON™ Project No. 0926125 Limited Asbestos Building Inspection Page No. - 3 October 01, 2012 Copyright © 2012 HERRON™ Enterprises USA, Inc. All Rights Reserved. Recommendations The Client has advised that Units 635 and 640, 133 Vail Rd., Vail, CO 81657 is a renovation. As Regulated Asbestos Containing Materials were not discovered during this inspection, further action is not required. Conclusion Based on the information generated by this report, we conclude that the aforementioned property does not contain Regulated Asbestos Containing Material(s) (RACM) in the locations inspected for purposes of a renovation. In order to comply with local, state, and/or federal regulations, the following RACM, or assumed RACM will have to be removed if they will be affected by the renovation or demolition: Not applicable. Although a material may have been determined to contain <=1.0% Asbestos, such as the composition of drywall/joint compound (when the joint compound does not cover the entire surface), traces of asbestos in surfacing materials, thermal system insulation materials, or miscellaneous materials, etc, which is not considered Regulated Asbestos Containing Materials by NESHAPS, EPA (AHERA), or the State of Colorado, may still be regulated by OSHA. OSHA regulations may apply during potential disturbance activities, and the inspection document will serve as a Hazard Communication and should be reviewed during an activity such as a renovation or demolition, to ensure that an exposure does not occur. The Maximum Allowable Asbestos Level (MAAL) may not be exceeded at ‘any’ time in accordance with local, state, and/or federal regulations, including but not limited to AQCC Regulation 8 (State), 29 CFR 1926.1101 (OSHA), 40 CFR Part 61 EPA (NESHAP), and 40 CFR 763 EPA (AHERA). This document serves as a certified notification to the owner/operator of the facility and the demolition contractor that any asbestos-containing material allowed to stay in the facility must remain non-friable during demolition. All building material field information concerning sampling protocols, locations, assessments, etc. is available in our files for Client use should the need arise. Suspect materials which were sampled and determined to contain <=1.0% Asbestos (refer to Attachments), by PLM and/or PLM Point Count analysis are: White Medium Textured Drywall Walls and Ceilings, Surfacing Material (S), <1,000 SF, Good Condition (Current Condition), Non-Friable, throughout Unit 640 Bathroom, 3 Sample(s), 092612-1A, E Wall, 2’ from Floor, 2’ from N Wall 092612-1B, Ceiling, 2’ from N Wall, 2’ from S Wall 092612-1C, SW Corner, 3’ from Floor White Swirl Textured Drywall Walls and Ceilings, Surfacing Material (S), <1,000 SF, Good Condition (Current Condition), Non-Friable, throughout Unit 635 Bathroom, 3 Sample(s), 092612-2A, W Wall, 2’ from Floor, 2’ from S Wall 092612-2B, Ceiling, 2’ from N Wall, 2’ from W Wall 092612-2C, SE Corner, 1’ from Floor Beige Trowel Textured Drywall Walls, Surfacing Material (S), <1,000 SF, Good Condition (Current Condition), Non- Friable, throughout Unit 640 Hall, 3 Sample(s), 092612-3A, N Wall, 2’ from Floor, 2.5’ from S Wall 092612-3B, E Wall, 2’ from Floor, 1.5’ from N Wall HERRON™ Enterprises USA, Inc. Phone (303) 763 9639 Fax (303) 763 9686 E-Mail Lennie.Herron@comcast.net Hazardous Materials*Mold*Asbestos*Lead Paint Website www.HERRON-Enterprises.com Environmental Services*Industrial Hygienists 7261 W. Hampden Ave., Lakewood, Colorado 80227-5305 HERRON™ Project No. 0926125 Limited Asbestos Building Inspection Page No. - 4 October 01, 2012 Copyright © 2012 HERRON™ Enterprises USA, Inc. All Rights Reserved. 092612-3C, SW corner, 1’ from Floor Suspect materials which were not within the Scope of Work at the time of the inspection were: 1. ‘All’ EPA suspect Materials not requested: a. Limited to locations of the submitted instructions and/or renovation/demolition plans, only. Any locations/materials not specifically identified are assumed to be a Regulated Asbestos Containing Material, and should be inspected prior to any activity which may disturb the materials; i. Refer to materials identified in the report; White Medium Textured Drywall Walls and Ceilings, throughout Unit 640 Bathroom White Swirl Textured Drywal Walls and Ceilings, Unit 635 Bathroom Beige Trowel Textured Drywall Walls, Unit 635 Hall 2. ‘Any’ confirmed or suspect ACM which may have been concealed at the time of the inspection. 3. During a normal inspection, and more specifically when non-destructive sampling techniques are employed, it is not within the scope of the inspection to remove surface materials to inspect the structures and/or materials which may be under the surface, i.e., within or under concealed areas such as under carpet, under sub-floors, within chases, walls, crawlspaces, tunnels, etc., to remove suspect Asbestos Containing Material(s), to move and/or sample electrical wiring which has not been 'locked out', etc. All said areas are to be assumed as containing >1.0% Asbestos, until such a time that these areas are made accessible, and/or rendered safe so that sampling can be performed. 4. HERRON™ recommends extreme caution during a renovation or demolition of these areas in the event that an area which was not suspect, visible, accessible and/or specified during the inspection, is discovered to contain or is suspected of containing an Asbestos Containing Material (ACM). Under local, state and/or federal regulations, should such an event occur, the Client and or Contractor is required to cease operations which may effect this (these) material(s) until an inspection is concluded and a determination is made by an AHERA and State Certified Asbestos Building Inspector. 5. It was expressly advised that although this is a Limited Asbestos Building Inspection, it is comprehensive to the aforementioned materials. Only materials impacted requiring response actions have been instructed and authorized by the Client. Under the protocol of limited sampling whereas not ‘all’ suspect materials outside of the response action areas were sampled, under local, state and/or federal regulations, including but not limited to AQCC Regulation 8 and OSHA 29 CFR 1926.1101, a certain protocol for sampling, number of samples obtained, and assessment is required. 6. Disturbance of these areas could create a potential health hazard. Suspect materials which were visually inspected and determined to be Non-ACM materials at the time of the inspection were: Fiberglass Wood Glass Metal Plastic Concrete Etc. HERRON™ Enterprises USA, Inc. Phone (303) 763 9639 Fax (303) 763 9686 E-Mail Lennie.Herron@comcast.net Hazardous Materials*Mold*Asbestos*Lead Paint Website www.HERRON-Enterprises.com Environmental Services*Industrial Hygienists 7261 W. Hampden Ave., Lakewood, Colorado 80227-5305 HERRON™ Project No. 0926125 Limited Asbestos Building Inspection Page No. - 5 October 01, 2012 Copyright © 2012 HERRON™ Enterprises USA, Inc. All Rights Reserved. Inspection Methodology: HERRON™ selected sample locations and frequency of sampling based on observations, Client requirements and/or the assumption that like materials in the same area are homogeneous in accordance with EPA Publication EPA 560 / 5-85 - 030a ‘Asbestos in Buildings: Simplified Sampling Scheme’. Sample locations and frequency of sampling of Walls and Ceilings are based on EPA 9/30/94 EPA Sampling Bulletin - ASBESTOS SAMPLING BULLETIN September 30, 1994 - Supplementary Guidance on Bulk Sample Collection and Analysis. Section V of this guidance bulletin offers a suggested strategy for distinguishing between joint compound found at joints in wallboard systems or when the material was applied as a skim coat; i.e., for determining whether “joint compound” has been applied as a “skim coat” over a wall surface (as referred to in the NESHAP Jan. 5, 1994 FR notice.). HERRON™ Enterprises USA, Inc. Phone (303) 763 9639 Fax (303) 763 9686 E-Mail Lennie.Herron@comcast.net Hazardous Materials*Mold*Asbestos*Lead Paint Website www.HERRON-Enterprises.com Environmental Services*Industrial Hygienists 7261 W. Hampden Ave., Lakewood, Colorado 80227-5305 HERRON™ Project No. 0926125 Limited Asbestos Building Inspection Page No. - 6 October 01, 2012 Copyright © 2012 HERRON™ Enterprises USA, Inc. All Rights Reserved. 1A 1B 1C 2A 2B 2C Reservoirs Environmental, Inc. Reservoirs Environmental QA Manual Effective January 1, 2012 T:\QAQC\Lab\Reservoirs Environmental QA Manual.doc Laboratory Code:RES Subcontract Number:NA Laboratory Report:RES 244936-1 Project # / P.O. #926125 Project Description: Lennie Herron RES 244936-1 Sincerely, Anita Grigg Robert R. Workman Jr. Melissa Hylton Anya Angst Brett S. Colbert Jillian A. Doherty September 27, 2012 Analyst(s): _________________________ Paul D. LoScalzo Wenlong Liu Michael Scales Adam Humphreys is the job number assigned to this study. This report is considered highly confidential andthesolepropertyofthecustomer.ReservoirsEnvironmental,Inc.willnotdiscussanypartofthis studywithpersonnelotherthanthoseoftheclient.Theresultsdescribedinthisreportonlyapplytothe samplesanalyzed.Thisreportmustnotbeusedtoclaimendorsementofproductsoranalyticalresultsby NVLAPoranyagencyoftheU.S.Government.Thisreportshallnotbereproducedexceptinfull,without writtenapprovalfromReservoirsEnvironmental,Inc.Sampleswillbedisposedofaftersixtydaysunless longerstorageisrequested.Ifyouhaveanyquestionsaboutthisreport,pleasefeelfreetocall303-964- 1986. Jeanne Spencer President Dear Customer, ReservoirsEnvironmental,Inc.isananalyticallaboratoryaccreditedfortheanalysisofIndustrialHygiene andEnvironmentalmatricesbytheNationalVoluntaryLaboratoryAccreditationProgram(NVLAP),Lab Code101896-0forTransmissionElectronMicroscopy(TEM)andPolarizedLightMicroscopy(PLM) analysisandtheAmericanIndustrialHygieneAssociation(AIHA),Lab ID101533-Accreditation Certificate#480forPhaseContrastMicroscopy(PCM)analysis.Thislaboratoryiscurrentlyproficientin both Proficiency Testing and PAT programs respectively. ReservoirsEnvironmental,Inc.hasanalyzedthefollowingsamplesforasbestoscontentasperyour request.Theanalysishasbeencompletedingeneralaccordancewiththeappropriatemethodologyas stated in the attached analysis table. The results have been submitted to your office. Herron Enterprises, USA, Inc. 7261 W. Hampden Ave. Lakewood CO 80227 None Given P: 303-964-1986 F: 303-477-4275 5801 Logan Street, Suite 100 Denver, CO 80216 Page 1 of 3 1-866-RESI-ENV www.reilab.com Re s e r v o i r s E n v i r o n m e n t a l , I n c . Re s e r v o i r s E n v i r o n m e n t a l Q A M a n u a l Effective January 1, 2012 T: \ Q A Q C \ L a b \ R e s e r v o i r s E n v i r o n m e n t a l Q A M a n u a l . d o c TA B L E P L M B U L K A N A L Y S I S , P E R C E N T A G E C O M P O S I T I O N B Y V O L U M E RE S J o b N u m b e r : Cl i e n t : Cl i e n t P r o j e c t N u m b e r / P . O . : Cl i e n t P r o j e c t D e s c r i p t i o n : Da t e S a m p l e s R e c e i v e d : An a l y s i s T y p e : ND=None Detected Tu r n a r o u n d : TR=Trace, <1% Visual Estimate Da t e A n a l y z e d : Trem-Act=Tremolite-Actinolite Cl i e n t NonNon- Sa m p l e Su b AsbestosFibrous Nu m b e r Ph y s i c a l P a r t F i b r o u s C o m p o n e n t s De s c r i p t i o n ( % ) Mi n e r a l V i s u a l Components(%) Es t i m a t e ( % ) (%) . 09 2 6 1 2 - 1 A EM 1 7 2 8 8 0 A W h i t e / t a n d r y w a l l w / l i g h t g r e e n p a i n t 1 0 0 ND1090 09 2 6 1 2 - 1 B EM 1 7 2 8 8 1 A C r e a m p a i n t w / w h i t e c o m p o u n d 2 ND0100 B G r e y / t a n d r y w a l l 9 8 ND1090 09 2 6 1 2 - 1 C EM 1 7 2 8 8 2 A C r e a m p a i n t w / w h i t e c o m p o u n d 5 ND0100 B G r e y / t a n d r y w a l l 9 5 ND1090 09 2 6 1 2 - 2 A EM 1 7 2 8 8 3 A P i n k / t a n d r y w a l l w / p e a c h p a i n t 1 0 0 ND1090 09 2 6 1 2 - 2 B EM 1 7 2 8 8 4 A C r e a m p a i n t w / w h i t e c o m p o u n d 1 0 ND0100 B P i n k / t a n d r y w a l l 9 0 ND1090 09 2 6 1 2 - 2 C EM 1 7 2 8 8 5 A W h i t e t a p e 5 ND982 B W h i t e j o i n t c o m p o u n d 1 0 ND0100 C W h i t e c o m p o u n d w / c r e a m p a i n t 2 0 ND0100 D P i n k / t a n d r y w a l l 6 5 ND1090 09 2 6 1 2 - 3 A EM 1 7 2 8 8 6 A W h i t e c o m p o u n d w / c r e a m p a i n t 1 0 ND0100 B P i n k / t a n d r y w a l l 9 0 ND1090 . RE S E R V O I R S E N V I R O N M E N T A L , I N C . NV L A P L a b C o d e 1 0 1 8 9 6 - 0 TD H L i c e n s e d L a b o r a t o r y # 3 0 - 0 1 3 6 ID N u m b e r L A Y E R La b 24 H o u r RE S 2 4 4 9 3 6 - 1 92 6 1 2 5 He r r o n E n t e r p r i s e s , U S A , I n c . Asb e s t o s C o n t e n t Se p t e m b e r 2 6 , 2 0 1 2 No n e G i v e n PL M , S h o r t R e p o r t Se p t e m b e r 2 6 , 2 0 1 2 TE M A n a l y s i s r e c o m m e n d e d f o r o r g a n i c a l l y b o u n d m a t e r i a l ( i . e . f l o o r t i l e ) i f P L M r e s u l t s a r e < 1 % . P: 3 0 3 - 9 6 4 - 1 9 8 6 F: 3 0 3 - 4 7 7 - 4 2 7 5 5 8 0 1 L o g a n S t r e e t , S u i t e 1 0 0 D e n v e r , C O 8 0 2 1 6 Pa g e 2 o f 3 _______Data QA 1-866-RESI-ENV www.reilab.com Re s e r v o i r s E n v i r o n m e n t a l , I n c . Re s e r v o i r s E n v i r o n m e n t a l Q A M a n u a l Effective January 1, 2012 T: \ Q A Q C \ L a b \ R e s e r v o i r s E n v i r o n m e n t a l Q A M a n u a l . d o c TA B L E P L M B U L K A N A L Y S I S , P E R C E N T A G E C O M P O S I T I O N B Y V O L U M E RE S J o b N u m b e r : Cl i e n t : Cl i e n t P r o j e c t N u m b e r / P . O . : Cl i e n t P r o j e c t D e s c r i p t i o n : Da t e S a m p l e s R e c e i v e d : An a l y s i s T y p e : ND=None Detected Tu r n a r o u n d : TR=Trace, <1% Visual Estimate Da t e A n a l y z e d : Trem-Act=Tremolite-Actinolite Cl i e n t NonNon- Sa m p l e Su b AsbestosFibrous Nu m b e r Ph y s i c a l P a r t F i b r o u s C o m p o n e n t s De s c r i p t i o n ( % ) Mi n e r a l V i s u a l Components(%) Es t i m a t e ( % ) (%) . RE S E R V O I R S E N V I R O N M E N T A L , I N C . NV L A P L a b C o d e 1 0 1 8 9 6 - 0 TD H L i c e n s e d L a b o r a t o r y # 3 0 - 0 1 3 6 ID N u m b e r L A Y E R La b 24 H o u r RE S 2 4 4 9 3 6 - 1 92 6 1 2 5 He r r o n E n t e r p r i s e s , U S A , I n c . Asb e s t o s C o n t e n t Se p t e m b e r 2 6 , 2 0 1 2 No n e G i v e n PL M , S h o r t R e p o r t Se p t e m b e r 2 6 , 2 0 1 2 09 2 6 1 2 - 3 B EM 1 7 2 8 8 7 A W h i t e c o m p o u n d w / c r e a m p a i n t 1 0 ND0100 B P i n k / t a n d r y w a l l 9 0 ND1090 09 2 6 1 2 - 3 C EM 1 7 2 8 8 8 A W h i t e c o m p o u n d w / c r e a m p a i n t 1 0 ND0100 B P i n k / t a n d r y w a l l 9 0 ND1090 TE M A n a l y s i s r e c o m m e n d e d f o r o r g a n i c a l l y b o u n d m a t e r i a l ( i . e . f l o o r t i l e ) i f P L M r e s u l t s a r e < 1 % . P: 3 0 3 - 9 6 4 - 1 9 8 6 F: 3 0 3 - 4 7 7 - 4 2 7 5 5 8 0 1 L o g a n S t r e e t , S u i t e 1 0 0 D e n v e r , C O 8 0 2 1 6 Pa g e 3 o f 3 _______Data QA 1-866-RESI-ENV www.reilab.com