Loading...
HomeMy WebLinkAboutB12-0561TOWN OF VAIL ` Department of Community Development 75 South Frontage Road Vail, CO 81657 Tel: 970-479-2128 www.vailgov.com Development Review Coordinator BUILDING PERMIT APPLICATION (Separate applications are required for alarm & sprinkler) Project Street Address: `�$o� �� ��oc.n) t7�- (Number) (Street) b °( (Suite #) Building/Complex Name: ��s� � 3E�.v i,.� � J f�-+. � Contractor Information Business Name: �!�'��-ttz� c� � -i- NL P�o;�#: p� ia- oc���s DRB #: \ �1tJ�� \� U� t lY Building Permit #: � ( � - � S � � Lot #: Block # Subdivision: Business Address: ��v t�a X Z c� � Work Class: New (Qj Addition (Qj Alteration � City �vo+�1 State: CO Zip: g<<o z0 Type of Buildin Single-Family �Duplex �j Multi-Family �j Contact Name: M�t 't�T- S�� � Commercial � Other �j Contact Phone: `�' `� �1 - � 3 �� Contact E-Mail: .Q N����p� ,'� 2NL ���� �°� i �� Work Type: Interior O E�erior O Both � I hereby acknowledge that I have read this application, fitled out in full the information required, vompleted an aocurate plot plan, and state that all the information as required is coRect. I agree to comply with the information and plot plan, to comp ' h all Town ordinances and state laws, and to build this stru re a rding to the town's zoning and subdivision codes, design evie ap- proved, International Building and Residential C s d other ordinances of tf,�Town applicable thereto. Owner/Owner's Representative Signature (Required) Applicant Information Applicant Name: �- S� i l� Applicant Phone: `� `� � " � 3� � APPlicant E-Mail: ��U \c� Q- t�UL�- �%Jc_..`�'_' � c� ln�:. l Project Information Owner Name: V Pr�D'vEY= '��SO"�� �ES �S� Parcel #: Z l v l— ( Z`� — 7i 3� �`� (For Parcel #, contect Eagle CouMy Asaessors OHice at (870-328-8640 or visit www.eaglecounty. us/patie) Far Offioe Use Only: r-ee Paid: D 1 Received From: "� Cash ptedc # l�� CC: Uisa / MC Lasi 4 CC # exp date: Auth # Valuation of Work Included Plans InGuded Work Electrical QYes �No OYes �No Mechanical �Yes �)No OYes �No Plumbing �Yes �jNo QYes �No Building ((�Yes ONo OYes �No 20 � �'alue of all work being performed: $ Z��� � (value based on IBC Section 109.3 & IRC Sedion 108.3� Electrical Square Footage Detailed Scope and Location of Work: • Q-E'MutJE 3 Q-�C.f�(_.E- � ws-N �� � ���-� Fv�r— L, t�—� � `� - $-e ✓�o,�o � �-e r�l�c-e � � � � � �-- • �cti�Y`� ��1'S � 3+, Vl� vJ � Y1 dc�v✓S -ta �n o. �c-� , � (use additional sheet ff necessary) Date Reoeiv � �C�C�O�[� OCT 1 �; 2012 L�i ( 40 TOWN OF VAIL �-�o,z . . . GLAZING PERFORMANCE - TOTAL UNIT Designer Series° Clad - Vent a CASEMENT Type of Glazing 2.5 mm ciear with 2.5 mm clear HGP 2.5 mm clear with 3 mm Low-E HGP 3 mm SolarET'" with 3 mm clear HGP 3 mm clear with 3 mm clear HGP 3 mm clear with 3 mm Low-E HGP 3 mm Bronze with 3 mm clear HGP 3 mm Bronze with 3 mm Low-E HGP 3 mm Gray with 3 mm clear HGP 3 mm Gray with 3 mm Low-E HGP 3 mm Green with 3 mm clear HGP 3 mm Green with 3 mm Low-E HGP 5/8" clear IG with 3 mm glass with 3 mm clear HGP 5/8" ciear IG with 3 mm glass with 3 mm Low-E HGP 5/8" Advanced Low-E IG with 2.5 mm glass with argon with 2.5 mm clear HGP 5/8" Advanced Low-E IG with 2.5 mm glass with argon with 2.5 mm Low-E HGP 5/8" Advanced Low-E IG with 3 mm glass with argon with 3 mm Low-E HGP b mm/3 mm Advanced Low-E laminated IG with ar on with 3 mm Low-E HGP 6 mm/3 mm Advanced Low-E laminated IG with argon with 4 mm Low-E HGP 5/8" NaturalSun Low-E IG with 2.5 mm giass with ar on with 2.5 mm clear HGP 5/8" NaturalSun Low-E IG with 2.5 mm glass with argon with 2.5 mm Low-E HGP 5/8" NaturalSun Low-E IG with 3 mm glass with ar on with 3 mm Low-E HGP 5/8" SunDefenseT"' Low-E IG with 2.5 mm glass with argon with 2.5 mm clear HGP 5/8" SunDefenseT"' Low-E IG with 2.5 mm glass with argon with 2.5 mm Low-E HGP 5/8" SunDefenseT"' Low-E IG with 3 mm glass with argon with 3 mm clear HGP 5/8" SunDefenseT"' Low-E IG with 3 mm giass with argon with 3 mm Low-E HGP 5/8" SunDefenseT"" Low-E IG with 4 mm glass with ar on with 4 mm clear HGP 5/8" SunDefenseT"" Low-E IG with 4 mm glass with argon with 4 mm Low-E HGP � o � u C�7 � IL N � � Shaded Areas Meet ENERGY STAR' Performance Criteria in 2ones Shown z V U.S. Canadaz Zone ER Zone 0.48 0.50 52 44 0.40 0.47 48 53 0.40 0.30 34 53 0.48 0.49 51 44 0.40 0.47 48 53 0.48 0.40 38 44 0.40 0.37 35 53 0.48 0.37 34 44 0.40 0.34 32 53 0.48 0.33 43 44 0.40 0.30 40 53 0.36 0.44 47 58 0.32 0.42 44 60 0.28 0.22 40 62 0.26 0.22 38 62 0.26 0.21 37 62 0.28 0.22 39 61 0.28 0.22 39 62 0.28 0.41 46 62 0.26 0.39 43 62 0.26 0.38 42 62 0.28 0.17 37 62 0.25 0.16 35 62 0.28 0.17 37 62 0.26 0.16 34 62 0.29 0.17 36 61 0.27 0.16 34 62 5/8" Bronze Advanced Low-E IG with 5 mm/3 mm lass with ar on with 2.5 mm clear HGP 0.30 0.19 26 61 5/8" Bronze Advanced Low-E IG with 5 mm/3 mm lass with ar on with 3 mm clear HGP 0.30 0.19 26 61 5/8" Bronze Advanced Low-E IG with 5 mm/3 mm qlass with ar on with 3 mm Low-E HGP 0.27 0.18 24 61 5/8" Bronze Advanced Low-E IG with 5 mm/4 mm lass with ar on with 4 mm Low-E HGP 0.27 0.18 24 61 5/8" Gray Advanced Low-E IG with 5 mm/3 mm lass with ar on with 2.5 mm clear HGP 0.30 0.18 22 61 5/8" Gray Advanced Low-E IG with 5 mm/3 mm lass with arqon with 3 mm clear HGP 0.30 0.18 22 61 5/8" Gray Advanced Low-E IG with 5 mm/3 mm glass with argon with 3 mm Low-E HGP 0.27 0.16 21 61 5/8" Gray Advanced Low-E IG with 5 mm/4 mm glass with arqon with 4 mm low-E HGP 0.27 0.16 20 61 5/8" Green Advanced Low-E IG with 5 mm/3 mm qlass with arqon with 2.5 mm clear HGP 0.30 0.19 31 61 5/8" Green Advanced Low-E IG with 5 mm/3 mm lass with ar on with 3 mm clear HGP 0.30 0.19 31 bC 5/8" Green Advanced Low-E IG with 5 mm/3 mm lass with ar on with 3 mm Low-E HGP 0.27 0.18 29 61 5/8" Green Advanced Low-E IG with 5 mm14 mm glass with argon with 4 mm Low-E HGP 0.27 0.17 29 61 5/8" Advanced Low-E HA IG with 3 mm glass with 3 mm clear HGP 5/8" Advanced low-E HA IG with 4 mm plass with 4 mm clear HGP 5/8" Advanced Low-E HA IG with 3 mm qlass with 3 mm Low-E HGP 5/8" Advanced Low-E HA IG with 4 mm qlass with 4 mm Low-E HGP 5/8" NatureiSun Low-E HA IG with 3 mm qiass with 3 mm clear HGP 5/8" NaturalSun Low-E HA IG with 4 mm glass with 4 mm clear HGP 5/8" NaturalSun Low-E HA IG with 3 mm glass with 3 mm Low-E HGP 0.30 0.22 40 61 0.32 0.22 39 61 0.28 0.21 37 62 0.29 0.21 37 61 0.31 0.39 45 61 0.32 0.38 45 60 0.28 0.38 42 61 5/8" NaturalSun Low-E HA IG with 4 mm glass with 4 mm Low-E HGP 0.29 0.36 42 61 Rev. 07/31/2012 Pe�la 2012 Architectural Design Manual � Division 08 -Openings � Windows and Doors � www.PellaADM.com 25 CM-12 Designer Series" GLAZING PERFORMANCE - TOTAL UNIT Designer Series` Clad - Fixed CASEMENT `o Type of Giazing � � LL = � � 3 mm clear with 3 mm clear HGP 3 mm clear with 3 mm Low-E HGP 3 mm SolarET"' with 3 mm clear HGP 3 mm Bronze with 3 mm clear HGP 3 mm Bronze with 3 mm Low-E HGP 3 mm Gray with 3 mm clear HGP 3 mm Gray with 3 mm Low-E HGP 3 mm Green with 3 mm clear HGP 3 mm Green with 3 mm Low-E HGP 5/8" clear with 3 mm glass with 3 mm clear HGP 5/8" clear with 3 mm glass with 3 mm Low-E HGP 5/8" Advanced Low-E IG with 2.5 mm glass with argon with 2.5 mm clear HGP 5/8" Advanced Low-E IG with 2.5 mm glass with argon with 2.5 mm Low-E HGP 5/8" Advanced Low-E IG with 3 mm glass with argon with 3 mm clear HGP 5/8" Advanced Low-E IG with 3 mm glass with argon with 3 mm Low-E HGP 5/8" Advanced Low-E IG with 4 mm glass with argon with 4 mm clear HGP 5/8" Advanced Low-E IG with 4 mm glass with argon with 4 mm Low-E HGP 5/8" NaturalSun Low-E IG with 2.5 mm glass with argon with 2.5 mm clear HGP 5/8" NaturalSun Low-E IG with 2.5 mm glass with argon with 2.5 mm Low-E HGP 5/8" NaturalSun Low-E IG with 3 mm glass with argon with 3 mm clear HGP 5/8" Natural$un Low-E IG with 3 mm glass with argon with 3 mm Low-E HGP 5/8" NaturalSun Low-E IG with 4mm glass with argon with 4 mm clear HGP 5/8" NaturalSun Low-E IG with 4 mm glass with argon with 4 mm Low-E HGP 5/8" SunDefenseT"' Low-E IG with 2.5 mm glass with argon with 2.5 mm ciear HGP 5/8" SunDefenseT"' Low-E IG with 2.5 mm giass with argon with 2.5 mm Low-E HGP 5/8" SunDefenseT"' Low-E IG with 3 mm glass with argon with 3 mm clear HGP 5/8" SunDefenseT"' Low-E IG with 3 mm glass with argon with 3 mm Low-E HGP 5/8" SunDefenseT"" Low-E IG with 4 mm glass with argon with 4 mm clear HGP 5/8" SunDefenseT"' Low-E IG with 4 mm glass with argon with 4 mm low-E HGP � � � u > 0.48 0.59 61 45 0.38 0.56 58 53 0.38 0.36 41 52 �- 0.48 0.48 46 45 0.38 0.44 43 53 0.48 0.44 41 45 0.38 0.40 38 53 0.48 0.39 52 45 0.38 0.35 49 53 0.35 0.29 0.25 0.22 0.25 0.23 0.27 0.24 0.25 0.23 0.26 0.23 0.27 0.24 0.24 0.22 0.25 0.22 0.27 0.24 0.26 0.25 0.26 0.25 0.26 0.25 0.49 0.47 0.48 0.45 0.46 0.44 0.20 0.19 0.20 0.19 0.20 0.19 57 53 49 48 45 47 44 55 52 55 51 54 50 45 42 44 42 44 41 R-Value - t/U-FaMOr See the Product Performance section for more SHGC = Solar Heat Gain Ccefficie�t detailed information or visit www.energystar.gov VLT %= Ysible Light Transmission for Energy 5tar guidelines. CR � Condensation Resistance NC �P ER = Canadian Energy Rating ' ��SC _ ..._---_ ....._..__ .__.. _..... ._._.. .._.._ ____.. .. ._.__ ___. .__... (1) Giazing performance values are calculated based on NFRC 100. $ (2) The values shown are based on Canada's updated ENERGY STARm initiative. ,� �' � Based on unR size, some products will use 2.Smm glass that may have improved glazing performance from what is shown. 58 60 62 62 62 61 62 62 62 62 62 61 62 62 62 62 62 62 62 a Shaded Areas Meet ENERGY STAR' Performance Criteria in Zones Shown Climat� U.S. Canadaz 2one ER Zone � 31___ 1__ _ _ l ___ � 2� I 1� 21 Rev. 07/31/2012 Pella 2012 Architectural Design Manual � Division 08 - Openings � Windows and Doors � www.PellaADM.com CM-13 � 11^ 28-2012 � � � � o �� � I Inspec�io J R nquCi� Q rting Requested Inspect Date: Thursday, November 29, 2012 Site Address: RIVERBEND AT AILAUNIT 9 .� Page 20 A/P/D information Status: ISSUED T e: COMBO Sub Use: R 3F Insp Area: Activity: 612-0561 YP Const Type: Occupancy . O w n e r: G A R DNER PERSONAL RESIDENCE TRUST AGREEME Phone: 970-949-6341 Contractor: ANKERHOLZ INC. Description: C�D ING O IBE UTTY O MATCH IB DODING �IKE FOR LIKE SIZE AND LOCATION. EXTERIOR Requested Inspection(s) Item: 542 PLAN-FINAL que ted Time: 08:00 AM Phone: 970-949-6341 Requestor: ANKERHOLZ INC Comments: 343-9032 Entered By: JMONDRAGON K Assigned To: B IBSON Time Exp: Action: � • � l� �� Item: 90 BLDG-Final Requeste Phone: 970-949 6341 Requestor: ANKERHOLZ INC. Comments: 343-9032 Entered By: JMONDRAGON K Assigned To: JMONDRAGON Time Exp: Acfion: � � � i Inspection Historv Item: 30 BLDG-Framing Item: 50 BLDG-Insulation Item: 542 PLAN-FINAL Item: 90 BLDG-Final � Run Id: 15027 REPT131 , .. . . 11-28-2012 Inspection Request Reporting Page 20 4�33 pm Vail, CO - Citv Of Requested Inspect Date: Thursday, November 29, 2012 Site Address: 4800 MEADOW DR VAIL RIVERBEND AT VAIL UNIT 9 A/PID Information Activity: B12-0561 Type: COMBO Sub Type: AMF Status: ISSUED Const Type: Occup ancY : Use: R-3 Insp Area: Owner: GARDNER PERSONAL RESIDENCE TRUST AGREEME Contractor: ANKERHOLZ INC. Phone: 970-949-6341 Description: REPLACE 1 SLIDING DOOR AND 9 WINDOWS. LIKE FOR LIKE SIZE AND LOCATION. EXTERIOR CLADDING TO BE PUTTY TO MATCH BUILDING It : J54� PLAN-FINAL tor' ANKERHOLZ INC. ents: 343-9032 �d To: BGIBSON ction: Item: 90 BLDG-Final estor: ANKERHOLZ IN �ents: 343-9032 �d To: JMONDRAG Inspection HistoN Item: 30 BLDG-Framing Item: 50 BLDG-Insulation Item: 542 PLAN-FINAL Item: 90 BLDG-Final ime Exp: Requested Time: 02:00 PM Phone: 970-949-6341 Entered By: JMONDRAGON K e Exp: `\.� N � G Requested Time: 08:00 AM Phone: 970-949-6341 Entered By: JMONDRAGON K REPT131 Run Id: 15027 NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES .� �o����.. Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657 p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149 COMBINATION BLDG PERMIT Permit #: B12-0561 Job Address: 4800 MEADOW DR VAIL Location......: RIVERBEND AT VAIL UNIT 9 Parcel No....: 210112423009 OWNER GARDNER PERSONAL RESIDENCE T 10/17/2012 7000 NORVALE CIR E GATES MILLS, OH 44040 APPLICANT ANKERHOLZ INC 10/17/2012 Phone: 970-949-6341 Project #: PRJ12-0635 Applied.....: 10/17/2012 Issued. . . : 10/26/2012 PO BOX 296 AVON CO 81620 License: C000003141 CONTRACTOR ANKERHOLZ INC. 10/17/2012 Phone: 970-949-6341 PO BOX 296 AVON CO 81620 License: C000003141 Description: REPLACE 1 SLIDING DOOR AND 9 WINDOWS. LIKE FOR LIKE SIZE AND LOCATION. EXTERIOR CLADDING TO BE PUTTY TO MATCH BUILDING Occupancy: R-3 Type Construction: VB Valuation: $20,000.00 ..............,...........,,.............�__......._..,�...........,.....,,,,,,.,.._.,.. FEE SUMMARY ........,.,,.,..,_,,..,..._..,�....,,..........,..,.,......,_......._.,...._........, Building Permit -----------> $321.25 Bldg Plan Check ----------> $208.81 Use Tax Fee-----------------------> $200.00 Electrical Permit ---------> $0.00 Elec Plan Check -----------> $0.00 Restuarant Plan Review--------> $0.00 Mechanical Perm'yt ------> $0.00 Mech Plan Check ---------> $0.00 Additional Fees--------------------> $0.00 Plumbing Permit --------> $0.00 Plmb Plan Check ---------> $0.00 Recreation Fee--------------------> $0.00 Investigation-----------------------> $0.00 Will Call------------------------------> $5.00 TOTAL PERMIT FEES--------------> $735.06 Payments----------°------------------> 3735.06 BALANCE DUE------------------------> $0.00 .,. .................,,,...........�,.,,...,............,,,...,,,.........,_......._......,..,..................,......._...,...,..,....,.....................,,.,............__......._..,... DECLARATIONS I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and other ordinances of the Town applicable thereto. REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149 OR AT OUR OFFICE FROM 8:00 AM - 4:00 PM. combination permit_012811 ' � i ��� V� �� 1 ,r,r.+�x+.+�r,.::���+,r,r�ww,r.r�+,r�+.+.�,+w...++:>++.�+.x�+,r:�w�x+.+.r�w,.:r,r�++x�.zv.:rxxx++.v.xw+x,r:�a�x,.,rx:,�x�,rx�,e,r.xx��w�xwww�.xwx���:v.,r.+w��rw..x�+.��rw,v:rxxx�wx.+.+xx+.�w�.ww�+�,r,+w,r�w�x,.,rxxw�ws,wevx�w CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF Permit #: B12-0561 Address: 4800 MEADOW DR VAIL Owner: GARDNER PERSONAL RESIDENCE TRUST AGREEME Location: RIVERBEND AT VAIL UNIT 9 twR4#rt#�k'khR4ff�i(iW�khRhk44t�1`1`�kNi1'�kf+Nwxt#fir44fYrY'#k4*�F*1�rt�RrtRRftrRi*'k'kffffffit`1��kfffRiFfiRwRLLftiF4k�x+t'kM'frfrfrxxwlrLRffYr##i4w111`f1`1(tYr�,F�kYeft�#fi++4�1rMelr+f rtk#��,1'Yrtete4**�k�kNY`Rt`1`Rk#Y'YrRtelrlt%fi4 V Rf1`fi1'wR4x144YeY14 Cond: 42 (BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE INSTALLED PER 2009 IRC R315 Entry: 12/03/2012 By: jrm Action: AP Cond: 44 (BLDG 2009): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION R314 OF THE 2009 IRC, IF APPLICABLE UNLESS A MONITORED FIRE ALARM SYSTEM IS REQUIRED. Entry: 12/03/2012 By: jrm Action: AP combination permit_012811 i � ��� �� i� a *r,r«..,t*,txww.**rr«««,tx**********t*rt««w*,tt***,r****t**** «,t,t+****,r,t*tr t*««+,t*,t*****..******r**+r*«*«*trt***,t*trtr***x,t,t*rr*w*r«««w*,t*� «**,tr***r*r*,t«r«.r*r*«,t REQUIRED INSPECTIONS AND STATUSES Permit #: 612-0561 Address: 4800 MEADOW DR VAIL Owner: GARDNER PERSONAL RESIDENCE TRUST AGREEME Location: RIVERBEND AT VAIL UNIT 9 ***.,*«****�***«*********«************************************«*««„****************************************«*«******�********�***.,************,.*««*�** Item: 00030 BLDG-Framing 12/03/2012 By: jrm Action: AP Item: 00050 BLDG-Insulation 12/03/2012 By: jrm Action: AP Item: 00542 PLAN-FINAL 11/30/2012 By: Warren Action: AP Item: 00090 BLDG-Final 12/03/2012 By: jrm Action: AP combination permit_012811 ****************+************************�+********+*++******+*+**********++*+************** TOWN OF VAIL, COLORADOCopy Reprinted on 12-31-2012 at 13:54:45 12/31/2012 Statement *********+*****************************************************************�**************** Statement Number: R120001755 Amount: $526.25 10/26/201201:15 PM Payment Method: Check Init: DR Notation: CK#1974 ANKERHOLZ INC ----------------------------------------------------------------------------- Permit No: B12-0561 Type: COMBINATION BLDG PERMIT Parcel No: 2101-124-2300-9 Site Address: 4800 MEADOW DR VAIL Location: RIVERBEND AT VAIL UNIT 9 Total Fees: $735.06 This Payment: $526.25 Total ALL Pmts: $735.06 Balance: $0.00 ******************************************a************************************�************ ACCOUNT ITEM LIST: Account Code Description Current Pmts -------------------- ------------------------------ ------------ BP 00100003111100 BUILDING PERMIT FEES 321.25 UT 11000003106000 USE TAX 4°s 200.00 WC 00100003112800 WILL CALL INSPECTION FEE 5.00