HomeMy WebLinkAboutB12-0561TOWN OF VAIL `
Department of Community Development
75 South Frontage Road
Vail, CO 81657
Tel: 970-479-2128
www.vailgov.com
Development Review Coordinator
BUILDING PERMIT APPLICATION
(Separate applications are required for alarm & sprinkler)
Project Street Address:
`�$o� �� ��oc.n) t7�-
(Number) (Street)
b °(
(Suite #)
Building/Complex Name: ��s� � 3E�.v i,.� � J f�-+. �
Contractor Information
Business Name: �!�'��-ttz� c� � -i- NL
P�o;�#: p� ia- oc���s
DRB #: \ �1tJ�� \� U� t lY
Building Permit #: � ( � - � S � �
Lot #: Block # Subdivision:
Business Address: ��v t�a X
Z c� � Work Class:
New (Qj Addition (Qj Alteration �
City �vo+�1 State: CO Zip: g<<o z0 Type of Buildin
Single-Family �Duplex �j Multi-Family �j
Contact Name: M�t 't�T- S�� � Commercial � Other �j
Contact Phone: `�' `� �1 - � 3 ��
Contact E-Mail: .Q N����p� ,'� 2NL ���� �°� i �� Work Type: Interior O E�erior O Both �
I hereby acknowledge that I have read this application, fitled out
in full the information required, vompleted an aocurate plot plan,
and state that all the information as required is coRect. I agree to
comply with the information and plot plan, to comp ' h all Town
ordinances and state laws, and to build this stru re a rding to
the town's zoning and subdivision codes, design evie ap-
proved, International Building and Residential C s d other
ordinances of tf,�Town applicable thereto.
Owner/Owner's Representative Signature (Required)
Applicant Information
Applicant Name: �- S� i l�
Applicant Phone: `� `� � " � 3� �
APPlicant E-Mail: ��U \c� Q- t�UL�- �%Jc_..`�'_' � c� ln�:. l
Project Information
Owner Name: V Pr�D'vEY= '��SO"�� �ES �S�
Parcel #: Z l v l— ( Z`� — 7i 3� �`�
(For Parcel #, contect Eagle CouMy Asaessors OHice at (870-328-8640 or visit
www.eaglecounty. us/patie)
Far Offioe Use Only:
r-ee Paid: D 1
Received From: "�
Cash ptedc # l��
CC: Uisa / MC Lasi 4 CC # exp date:
Auth #
Valuation of
Work Included Plans InGuded Work
Electrical QYes �No OYes �No
Mechanical �Yes �)No OYes �No
Plumbing �Yes �jNo QYes �No
Building ((�Yes ONo OYes �No 20 �
�'alue of all work being performed: $ Z��� �
(value based on IBC Section 109.3 & IRC Sedion 108.3�
Electrical Square Footage
Detailed Scope and Location of Work:
• Q-E'MutJE 3 Q-�C.f�(_.E- �
ws-N �� � ���-� Fv�r— L, t�—� �
`� - $-e ✓�o,�o � �-e r�l�c-e � � � � � �--
• �cti�Y`� ��1'S � 3+, Vl� vJ � Y1 dc�v✓S
-ta �n o. �c-� ,
�
(use additional sheet ff necessary)
Date Reoeiv
� �C�C�O�[�
OCT 1 �; 2012
L�i ( 40
TOWN OF VAIL
�-�o,z
. . .
GLAZING PERFORMANCE - TOTAL UNIT
Designer Series° Clad - Vent a
CASEMENT
Type of Glazing
2.5 mm ciear with 2.5 mm clear HGP
2.5 mm clear with 3 mm Low-E HGP
3 mm SolarET'" with 3 mm clear HGP
3 mm clear with 3 mm clear HGP
3 mm clear with 3 mm Low-E HGP
3 mm Bronze with 3 mm clear HGP
3 mm Bronze with 3 mm Low-E HGP
3 mm Gray with 3 mm clear HGP
3 mm Gray with 3 mm Low-E HGP
3 mm Green with 3 mm clear HGP
3 mm Green with 3 mm Low-E HGP
5/8" clear IG with 3 mm glass with 3 mm clear HGP
5/8" ciear IG with 3 mm glass with 3 mm Low-E HGP
5/8" Advanced Low-E IG with 2.5 mm glass with argon with 2.5 mm clear HGP
5/8" Advanced Low-E IG with 2.5 mm glass with argon with 2.5 mm Low-E HGP
5/8" Advanced Low-E IG with 3 mm glass with argon with 3 mm Low-E HGP
b mm/3 mm Advanced Low-E laminated IG with ar on with 3 mm Low-E HGP
6 mm/3 mm Advanced Low-E laminated IG with argon with 4 mm Low-E HGP
5/8" NaturalSun Low-E IG with 2.5 mm giass with ar on with 2.5 mm clear HGP
5/8" NaturalSun Low-E IG with 2.5 mm glass with argon with 2.5 mm Low-E HGP
5/8" NaturalSun Low-E IG with 3 mm glass with ar on with 3 mm Low-E HGP
5/8" SunDefenseT"' Low-E IG with 2.5 mm glass with argon with 2.5 mm clear HGP
5/8" SunDefenseT"' Low-E IG with 2.5 mm glass with argon with 2.5 mm Low-E HGP
5/8" SunDefenseT"' Low-E IG with 3 mm glass with argon with 3 mm clear HGP
5/8" SunDefenseT"' Low-E IG with 3 mm giass with argon with 3 mm Low-E HGP
5/8" SunDefenseT"" Low-E IG with 4 mm glass with ar on with 4 mm clear HGP
5/8" SunDefenseT"" Low-E IG with 4 mm glass with argon with 4 mm Low-E HGP
�
o �
u C�7
�
IL N �
�
Shaded Areas Meet ENERGY STAR'
Performance Criteria in 2ones Shown
z
V U.S. Canadaz
Zone ER Zone
0.48 0.50 52 44
0.40 0.47 48 53
0.40 0.30 34 53
0.48 0.49 51 44
0.40 0.47 48 53
0.48 0.40 38 44
0.40 0.37 35 53
0.48 0.37 34 44
0.40 0.34 32 53
0.48 0.33 43 44
0.40 0.30 40 53
0.36 0.44 47 58
0.32 0.42 44 60
0.28 0.22 40 62
0.26 0.22 38 62
0.26 0.21 37 62
0.28 0.22 39 61
0.28 0.22 39 62
0.28 0.41 46 62
0.26 0.39 43 62
0.26 0.38 42 62
0.28 0.17 37 62
0.25 0.16 35 62
0.28 0.17 37 62
0.26 0.16 34 62
0.29 0.17 36 61
0.27 0.16 34 62
5/8" Bronze Advanced Low-E IG with 5 mm/3 mm lass with ar on with 2.5 mm clear HGP 0.30 0.19 26 61
5/8" Bronze Advanced Low-E IG with 5 mm/3 mm lass with ar on with 3 mm clear HGP 0.30 0.19 26 61
5/8" Bronze Advanced Low-E IG with 5 mm/3 mm qlass with ar on with 3 mm Low-E HGP 0.27 0.18 24 61
5/8" Bronze Advanced Low-E IG with 5 mm/4 mm lass with ar on with 4 mm Low-E HGP 0.27 0.18 24 61
5/8" Gray Advanced Low-E IG with 5 mm/3 mm lass with ar on with 2.5 mm clear HGP 0.30 0.18 22 61
5/8" Gray Advanced Low-E IG with 5 mm/3 mm lass with arqon with 3 mm clear HGP 0.30 0.18 22 61
5/8" Gray Advanced Low-E IG with 5 mm/3 mm glass with argon with 3 mm Low-E HGP 0.27 0.16 21 61
5/8" Gray Advanced Low-E IG with 5 mm/4 mm glass with arqon with 4 mm low-E HGP 0.27 0.16 20 61
5/8" Green Advanced Low-E IG with 5 mm/3 mm qlass with arqon with 2.5 mm clear HGP 0.30 0.19 31 61
5/8" Green Advanced Low-E IG with 5 mm/3 mm lass with ar on with 3 mm clear HGP 0.30 0.19 31 bC
5/8" Green Advanced Low-E IG with 5 mm/3 mm lass with ar on with 3 mm Low-E HGP 0.27 0.18 29 61
5/8" Green Advanced Low-E IG with 5 mm14 mm glass with argon with 4 mm Low-E HGP 0.27 0.17 29 61
5/8" Advanced Low-E HA IG with 3 mm glass with 3 mm clear HGP
5/8" Advanced low-E HA IG with 4 mm plass with 4 mm clear HGP
5/8" Advanced Low-E HA IG with 3 mm qlass with 3 mm Low-E HGP
5/8" Advanced Low-E HA IG with 4 mm qlass with 4 mm Low-E HGP
5/8" NatureiSun Low-E HA IG with 3 mm qiass with 3 mm clear HGP
5/8" NaturalSun Low-E HA IG with 4 mm glass with 4 mm clear HGP
5/8" NaturalSun Low-E HA IG with 3 mm glass with 3 mm Low-E HGP
0.30 0.22 40 61
0.32 0.22 39 61
0.28 0.21 37 62
0.29 0.21 37 61
0.31 0.39 45 61
0.32 0.38 45 60
0.28 0.38 42 61
5/8" NaturalSun Low-E HA IG with 4 mm glass with 4 mm Low-E HGP 0.29 0.36 42 61
Rev. 07/31/2012 Pe�la 2012 Architectural Design Manual � Division 08 -Openings � Windows and Doors � www.PellaADM.com
25
CM-12
Designer Series"
GLAZING PERFORMANCE - TOTAL UNIT
Designer Series` Clad - Fixed
CASEMENT
`o
Type of Giazing � �
LL =
�
�
3 mm clear with 3 mm clear HGP
3 mm clear with 3 mm Low-E HGP
3 mm SolarET"' with 3 mm clear HGP
3 mm Bronze with 3 mm clear HGP
3 mm Bronze with 3 mm Low-E HGP
3 mm Gray with 3 mm clear HGP
3 mm Gray with 3 mm Low-E HGP
3 mm Green with 3 mm clear HGP
3 mm Green with 3 mm Low-E HGP
5/8" clear with 3 mm glass with 3 mm clear HGP
5/8" clear with 3 mm glass with 3 mm Low-E HGP
5/8" Advanced Low-E IG with 2.5 mm glass with argon with 2.5 mm clear HGP
5/8" Advanced Low-E IG with 2.5 mm glass with argon with 2.5 mm Low-E HGP
5/8" Advanced Low-E IG with 3 mm glass with argon with 3 mm clear HGP
5/8" Advanced Low-E IG with 3 mm glass with argon with 3 mm Low-E HGP
5/8" Advanced Low-E IG with 4 mm glass with argon with 4 mm clear HGP
5/8" Advanced Low-E IG with 4 mm glass with argon with 4 mm Low-E HGP
5/8" NaturalSun Low-E IG with 2.5 mm glass with argon with 2.5 mm clear HGP
5/8" NaturalSun Low-E IG with 2.5 mm glass with argon with 2.5 mm Low-E HGP
5/8" NaturalSun Low-E IG with 3 mm glass with argon with 3 mm clear HGP
5/8" Natural$un Low-E IG with 3 mm glass with argon with 3 mm Low-E HGP
5/8" NaturalSun Low-E IG with 4mm glass with argon with 4 mm clear HGP
5/8" NaturalSun Low-E IG with 4 mm glass with argon with 4 mm Low-E HGP
5/8" SunDefenseT"' Low-E IG with 2.5 mm glass with argon with 2.5 mm ciear HGP
5/8" SunDefenseT"' Low-E IG with 2.5 mm giass with argon with 2.5 mm Low-E HGP
5/8" SunDefenseT"' Low-E IG with 3 mm glass with argon with 3 mm clear HGP
5/8" SunDefenseT"' Low-E IG with 3 mm glass with argon with 3 mm Low-E HGP
5/8" SunDefenseT"" Low-E IG with 4 mm glass with argon with 4 mm clear HGP
5/8" SunDefenseT"' Low-E IG with 4 mm glass with argon with 4 mm low-E HGP
� �
� u
>
0.48 0.59 61 45
0.38 0.56 58 53
0.38 0.36 41 52
�-
0.48 0.48 46 45
0.38 0.44 43 53
0.48 0.44 41 45
0.38 0.40 38 53
0.48 0.39 52 45
0.38 0.35 49 53
0.35
0.29
0.25
0.22
0.25
0.23
0.27
0.24
0.25
0.23
0.26
0.23
0.27
0.24
0.24
0.22
0.25
0.22
0.27
0.24
0.26
0.25
0.26
0.25
0.26
0.25
0.49
0.47
0.48
0.45
0.46
0.44
0.20
0.19
0.20
0.19
0.20
0.19
57
53
49
48
45
47
44
55
52
55
51
54
50
45
42
44
42
44
41
R-Value - t/U-FaMOr See the Product Performance section for more
SHGC = Solar Heat Gain Ccefficie�t detailed information or visit www.energystar.gov
VLT %= Ysible Light Transmission for Energy 5tar guidelines.
CR � Condensation Resistance NC �P
ER = Canadian Energy Rating ' ��SC
_ ..._---_ ....._..__ .__.. _..... ._._.. .._.._ ____.. .. ._.__ ___. .__...
(1) Giazing performance values are calculated based on NFRC 100. $
(2) The values shown are based on Canada's updated ENERGY STARm initiative. ,� �' �
Based on unR size, some products will use 2.Smm glass that may have improved glazing performance from what is shown.
58
60
62
62
62
61
62
62
62
62
62
61
62
62
62
62
62
62
62
a
Shaded Areas Meet ENERGY STAR'
Performance Criteria in Zones Shown
Climat�
U.S. Canadaz
2one ER Zone
� 31___ 1__ _ _ l ___
�
2� I 1�
21
Rev. 07/31/2012 Pella 2012 Architectural Design Manual � Division 08 - Openings � Windows and Doors � www.PellaADM.com CM-13
�
11^ 28-2012
� � � � o ��
�
I
Inspec�io J R nquCi� Q
rting
Requested Inspect Date: Thursday, November 29, 2012
Site Address: RIVERBEND AT AILAUNIT 9
.�
Page 20
A/P/D information Status: ISSUED
T e: COMBO Sub Use: R 3F Insp Area:
Activity: 612-0561 YP
Const Type: Occupancy .
O w n e r: G A R DNER PERSONAL RESIDENCE TRUST
AGREEME Phone: 970-949-6341
Contractor: ANKERHOLZ INC.
Description: C�D ING O IBE UTTY O MATCH IB DODING �IKE FOR LIKE SIZE AND LOCATION. EXTERIOR
Requested Inspection(s)
Item: 542 PLAN-FINAL que ted Time: 08:00 AM
Phone: 970-949-6341
Requestor: ANKERHOLZ INC
Comments: 343-9032 Entered By: JMONDRAGON K
Assigned To: B IBSON Time Exp:
Action:
� • � l� ��
Item: 90 BLDG-Final Requeste Phone: 970-949 6341
Requestor: ANKERHOLZ INC.
Comments: 343-9032 Entered By: JMONDRAGON K
Assigned To: JMONDRAGON Time Exp:
Acfion:
� � �
i
Inspection Historv
Item: 30 BLDG-Framing
Item: 50 BLDG-Insulation
Item: 542 PLAN-FINAL
Item: 90 BLDG-Final
�
Run Id: 15027
REPT131
, .. . .
11-28-2012 Inspection Request Reporting Page 20
4�33 pm Vail, CO - Citv Of
Requested Inspect Date: Thursday, November 29, 2012
Site Address: 4800 MEADOW DR VAIL
RIVERBEND AT VAIL UNIT 9
A/PID Information
Activity: B12-0561 Type: COMBO Sub Type: AMF Status: ISSUED
Const Type: Occup ancY : Use: R-3 Insp Area:
Owner: GARDNER PERSONAL RESIDENCE TRUST
AGREEME
Contractor: ANKERHOLZ INC. Phone: 970-949-6341
Description: REPLACE 1 SLIDING DOOR AND 9 WINDOWS. LIKE FOR LIKE SIZE AND LOCATION. EXTERIOR
CLADDING TO BE PUTTY TO MATCH BUILDING
It : J54� PLAN-FINAL
tor' ANKERHOLZ INC.
ents: 343-9032
�d To: BGIBSON
ction:
Item: 90 BLDG-Final
estor: ANKERHOLZ IN
�ents: 343-9032
�d To: JMONDRAG
Inspection HistoN
Item: 30 BLDG-Framing
Item: 50 BLDG-Insulation
Item: 542 PLAN-FINAL
Item: 90 BLDG-Final
ime Exp:
Requested Time: 02:00 PM
Phone: 970-949-6341
Entered By: JMONDRAGON K
e Exp:
`\.�
N
�
G
Requested Time: 08:00 AM
Phone: 970-949-6341
Entered By: JMONDRAGON K
REPT131 Run Id: 15027
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
.�
�o����..
Town of Vail, Community Development, 75 South Frontage Road, Vail, Colorado 81657
p. 970.479.2139, f. 970.479.2452, inpsections 970.479.2149
COMBINATION BLDG PERMIT Permit #: B12-0561
Job Address: 4800 MEADOW DR VAIL
Location......: RIVERBEND AT VAIL UNIT 9
Parcel No....: 210112423009
OWNER GARDNER PERSONAL RESIDENCE T 10/17/2012
7000 NORVALE CIR E
GATES MILLS, OH
44040
APPLICANT ANKERHOLZ INC 10/17/2012 Phone: 970-949-6341
Project #: PRJ12-0635
Applied.....: 10/17/2012
Issued. . . : 10/26/2012
PO BOX 296
AVON
CO 81620
License: C000003141
CONTRACTOR ANKERHOLZ INC. 10/17/2012 Phone: 970-949-6341
PO BOX 296
AVON
CO 81620
License: C000003141
Description:
REPLACE 1 SLIDING DOOR AND 9 WINDOWS. LIKE FOR LIKE SIZE
AND LOCATION. EXTERIOR CLADDING TO BE PUTTY TO MATCH
BUILDING
Occupancy: R-3 Type Construction: VB
Valuation: $20,000.00
..............,...........,,.............�__......._..,�...........,.....,,,,,,.,.._.,.. FEE SUMMARY ........,.,,.,..,_,,..,..._..,�....,,..........,..,.,......,_......._.,...._........,
Building Permit -----------> $321.25 Bldg Plan Check ----------> $208.81 Use Tax Fee-----------------------> $200.00
Electrical Permit ---------> $0.00 Elec Plan Check -----------> $0.00 Restuarant Plan Review--------> $0.00
Mechanical Perm'yt ------> $0.00 Mech Plan Check ---------> $0.00 Additional Fees--------------------> $0.00
Plumbing Permit --------> $0.00 Plmb Plan Check ---------> $0.00 Recreation Fee--------------------> $0.00
Investigation-----------------------> $0.00
Will Call------------------------------> $5.00
TOTAL PERMIT FEES--------------> $735.06
Payments----------°------------------> 3735.06
BALANCE DUE------------------------> $0.00
.,. .................,,,...........�,.,,...,............,,,...,,,.........,_......._......,..,..................,......._...,...,..,....,.....................,,.,............__......._..,...
DECLARATIONS
I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure
according to the town's zoning and subdivision codes, design review approved, International Building and Residential Codes and
other ordinances of the Town applicable thereto.
REQUESTS FOR INSPECTION SHALL BE MADE TWENTY-FOUR HOURS IN ADVANCE BY TELEPHONE AT 970.479.2149
OR AT OUR OFFICE FROM 8:00 AM - 4:00 PM.
combination permit_012811
' �
i
��� V� �� 1
,r,r.+�x+.+�r,.::���+,r,r�ww,r.r�+,r�+.+.�,+w...++:>++.�+.x�+,r:�w�x+.+.r�w,.:r,r�++x�.zv.:rxxx++.v.xw+x,r:�a�x,.,rx:,�x�,rx�,e,r.xx��w�xwww�.xwx���:v.,r.+w��rw..x�+.��rw,v:rxxx�wx.+.+xx+.�w�.ww�+�,r,+w,r�w�x,.,rxxw�ws,wevx�w
CONDITIONS OF APPROVAL TO BE MET PRIOR TO FINAL SIGN OFF
Permit #: B12-0561 Address: 4800 MEADOW DR VAIL
Owner: GARDNER PERSONAL RESIDENCE TRUST AGREEME
Location: RIVERBEND AT VAIL UNIT 9
twR4#rt#�k'khR4ff�i(iW�khRhk44t�1`1`�kNi1'�kf+Nwxt#fir44fYrY'#k4*�F*1�rt�RrtRRftrRi*'k'kffffffit`1��kfffRiFfiRwRLLftiF4k�x+t'kM'frfrfrxxwlrLRffYr##i4w111`f1`1(tYr�,F�kYeft�#fi++4�1rMelr+f rtk#��,1'Yrtete4**�k�kNY`Rt`1`Rk#Y'YrRtelrlt%fi4 V Rf1`fi1'wR4x144YeY14
Cond: 42
(BLDG 2009) CARBON MONOXIDE DETECTORS REQUIRED TO BE
INSTALLED PER 2009 IRC R315
Entry: 12/03/2012 By: jrm Action: AP
Cond: 44
(BLDG 2009): (SFR) SMOKE DETECTORS ARE REQUIRED PER SECTION
R314 OF THE 2009 IRC, IF APPLICABLE UNLESS A MONITORED FIRE
ALARM SYSTEM IS REQUIRED.
Entry: 12/03/2012 By: jrm Action: AP
combination permit_012811
i
�
��� �� i� a
*r,r«..,t*,txww.**rr«««,tx**********t*rt««w*,tt***,r****t**** «,t,t+****,r,t*tr t*««+,t*,t*****..******r**+r*«*«*trt***,t*trtr***x,t,t*rr*w*r«««w*,t*� «**,tr***r*r*,t«r«.r*r*«,t
REQUIRED INSPECTIONS AND STATUSES
Permit #: 612-0561 Address: 4800 MEADOW DR VAIL
Owner: GARDNER PERSONAL RESIDENCE TRUST AGREEME
Location: RIVERBEND AT VAIL UNIT 9
***.,*«****�***«*********«************************************«*««„****************************************«*«******�********�***.,************,.*««*�**
Item: 00030 BLDG-Framing
12/03/2012 By: jrm Action: AP
Item: 00050 BLDG-Insulation
12/03/2012 By: jrm Action: AP
Item: 00542 PLAN-FINAL
11/30/2012 By: Warren Action: AP
Item: 00090 BLDG-Final
12/03/2012 By: jrm Action: AP
combination permit_012811
****************+************************�+********+*++******+*+**********++*+**************
TOWN OF VAIL, COLORADOCopy Reprinted on 12-31-2012 at 13:54:45 12/31/2012
Statement
*********+*****************************************************************�****************
Statement Number: R120001755 Amount: $526.25 10/26/201201:15 PM
Payment Method: Check Init: DR
Notation: CK#1974
ANKERHOLZ INC
-----------------------------------------------------------------------------
Permit No: B12-0561 Type: COMBINATION BLDG PERMIT
Parcel No: 2101-124-2300-9
Site Address: 4800 MEADOW DR VAIL
Location: RIVERBEND AT VAIL UNIT 9
Total Fees: $735.06
This Payment: $526.25 Total ALL Pmts: $735.06
Balance: $0.00
******************************************a************************************�************
ACCOUNT ITEM LIST:
Account Code Description Current Pmts
-------------------- ------------------------------ ------------
BP 00100003111100 BUILDING PERMIT FEES 321.25
UT 11000003106000 USE TAX 4°s 200.00
WC 00100003112800 WILL CALL INSPECTION FEE 5.00