HomeMy WebLinkAboutB12-0356 REV3 LSD ASI 2
123 North College Avenue, Suite 206 Fort Collins, CO 80524 Phone: (970) 449-4100 Fax: (970) 449-4101
Architect's Supplemental Instructions
Project
Ford Park Phase I Improvements
Owner
Town of Vail
Todd Oppenheimer
530 South Frontage Road E
Vail, CO 81657
From
Logan Simpson Design, Inc
Kurt Friesen
123 North College Avenue, Suite 206
Fort Collins, CO 80524
970.449.4100
To
R.A. Nelson
Mike Kowalski
51 Eagle Road #2
Avon, CO 81620
970.949.5152
Architect's Supplemental Instruction NO:
LS ASI2
Date of Issuance
10.11.2012
Contract For
General Construction
Contract Date
Project Number
125315
Clarifications to Previous ASI & RFI's:
1. LS AS1 001, Sheet C610 - Contractor can disregard note pertaining to boring beneath existing wall.
Contractor can also disregard note referencing reducers and couplings for 4-inch DIP and 3-inch meter.
2. LS ASI 001, Sheet C712 - Use C900 pipe behind the boulder wall instead of PVC.
3. LS ASI 001, Sheet LG106 - Contractor to raise the flat-top manhole lid by use of an additional manhole
barrel section. Provide sealant in all joints. Coordinate with Holy Cross Electric.
4. LS ASI 001, Sheet LS201/Pavement Jointing & reinforcement clarifications. The Paver Edge
Restraint, Concrete Pavers, Concrete Walk, Asphalt Walk, and Concrete Curb details have been updated
to provide greater clarification on pavement widths and reinforcing requirements. These modifications
are based upon recommendations provided by Brian Reck with Ground Engineering. For additional
123 North College Avenue, Suite 206 Fort Collins, CO 80524 Phone: (970) 449-4100 Fax: (970) 449-4101
clarifications regarding pavement design requirements, please contact Brian Reck at
BrianR@groundeng.com.
New Instructions
1. Betty Ford Way Inlet Structures. Remove the proposed inlet structures and pipes from the
following station locations along East Betty Ford Way:
11+18.00
12+70.77
14+33.70
15+66.78
17+20.65
18+20.88
2. Transformer locate Information. See attached drawing for revised grading and locate
information for the transformer near the Concessions building.
3. Concrete Walk Jointing Plan. A concrete walk jointing plan has been provided . See LS ASI
001 Joint Sheet 2 for Betty Ford Way jointing information.
Attachments:
LS ASI 002 Concrete Walk Detail
LS ASI 002 Concrete Pavers Detail
LS ASI 002 Paver Edge Restraint Detail
LS ASI 002 Asphalt Walk Detail
LS ASI 002 Concrete Curb Detail
LS ASI 002 6" Vertical Curb and Gutter Detail
LS ASI 002 Transformer Locate Plan
LS ASI 002 Concrete Walk Joint Layout Plan
Issued by:
____________________________ _____________________________ _________________
(Signature) (Printed Name and Title) (Date)