HomeMy WebLinkAboutB12-0585 BP Application-1309 Elkhorn DrIAWN OFVAIL)
(..or^ Bd# Slolot"
Department of Community Development
75 South Frontage Road
Vait, CO 81657
Tel: 970{79-2128
www.vailgov.com
Development Review Coordinator
BUILDING PERMIT APPLICATION
(Separate applications are required for alarm & sprinkler)
Projecl Street Address:
| 309 E tKt
(Number) (Street)
b il'
Building/Complex Name: l1,-ro l,c
Contractor Information
Business Name:
rl/\
contact E_Malt: C S fa 1ey P, aIZCS . C oAA
I hereby acknowledge that I have read this applicatjon, fi ed out
in fullfre information required, completed an accurate plot plan,
and state that all the information as requjred is conect. I aqree to
comply with the informabon and plor plan, to comply wih aii Town
ordinances and state laws. and to build this structure accordino to
the town's zoning and subdivision codes, design review ap_
proved, IntemationalBuilding and Residential Codes and other
ordinances of the Town applicable thereto.
Applicant Name:e,slle- 0Ld, S - sea a'lfa"Jnef Sou/.
(Suite f)
- (o^t ["- L,
, Business Address:
Owner/Owne/s Representative Signature (Required)
Applicant Information
Applicant Phone:
Applicant E-Mail:
work class: ^"*X Addirion ( ) Alieration ( )
Work Tlrpe:Interior ( ) ExteriorDd Both ( )
Valuation of I
Work Included Plans included Work
Detailed Scope and Location of Work:
Proiect lnformation .--
Owner Name:
Pa,,.t#. 7\Ol - OlL- OOoO- t
16e, Parcet#,"onta@1
wvvweaglecounty.usrpate)
Wr.kr
"T-BD
DRB#: DkB/ LO35Z
Lot #:_ Block # Subdivision:
Mechanicat ( )ves ftfNo ( )yes (?4No
Plumbing ( )Yes f{No { )yes (>Slo
Buirding ,K"" t )No D<yes ( )No
Value of all work being performed: I
{vaiue based on l8C Sect'on 109 3 & tRC Section 108.3)
Electricai Square Footage
tq.+7 L33Lt
afecs.c-awt
For Oflice Use Only:
cnsh _ Check #
CC: VisE /MC Lan4 CC #
Auth #
Date Received:
By David Rhoades at 4:59 pm, Oct 26, 2012
PRJ12-0378
B12-0585
Detailed Scope and Location of Work:
Excavate a 51’ x 25’ area for new tower development next to the existing maintenance storage sheds
along south lot line. Two new 57’ monopole towers and foundations to be installed, add one new pre-
fab radio shelter (exterior siding to match existing Public Works adjacent storage)on new slab, add
grounding for each tower and the equipment shelter, add new utility H-frame, resurface the site with
asphalt, relocate an existing drain around the tower site, new temporary 200amp aerial power. Add all
new telco and power conduits underground for permanent power (new transformer TBD). Add the
antenna system to the tower. Paint tower and all equipment attached with Planning approved paint
color schematic.
UTILITY APPROVAL & VERIFICATION
This form serves to verify that the proposed improvements will not impact any existing or proposed utility services, and also to verify
service availability and location for new construction and should be used in conjunction with preparing your utility plan and scheduling
installations. A site plan, including grading plan, floor plan, and elevations, shall be submitted to the following utilities for approval and
verification. PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM THE UTILITY COMPANIES. If you are
unable to obtain comments within that timeframe please contact The Town of Vail.
Subject Property Address: ____________________________ Lot______ Block _____ Subdivision: ____________
Primary Contact / Owner Representative: ___________________________ Phone: _______________________
______________________________________________________ Plans Dated: ________________________
Primary Contact/Owner Representative Signature
NOTES:
1. Utility locations must be obtained before digging.
2. A Revocable Right-of-Way Permit may be required for any improvements within a street right-of-way. Contact the Public
Works Department for verification 970.479.2198.
3. It is the responsibility of the utility company and the applicant to resolve problems identified above.
4. The Primary Contact/Owner Representative is required to submit any revised drawings to the above agencies for
re-approval & re-verification if the submitted plans are altered in any way after the authorized signature date.
Authorized Signature Comments Date
CENTURYLINK
970.468.6860(tel)
970.468.0672(fax)
Contacts: Samuel Tooley
samuel.tooley@centurylink.com
XCEL HIGH PRESSURE GAS
970.262.4076 (tel)
970.468.1401 (fax)
Contact: Rich Sisneros
richard.sisneros@xcelenergy.com
HOLY CROSS ENERGY
970.947.5425 (tel)
970.945.4081 (fax)
Contact: Jeff Vroom
jvroom@holycross.com
9/4/12
XCEL Energy
970.262.4024 (tel)
970.262.4038 (fax)
Contacts: Ronnie Bureta
ronnie.j.bureta@xcelenergy.com
EAGLE RIVER WATER & SANITA-
TION DISTRICT
970.477.5435 (tel)
970.477.5434 (fax)
Contact: Tug Birk
tbirk@erwsd.org
COMCAST CABLE
970.619.0752 (tel)
970.468-2672 (fax)
Contact: Tony Hildreth
tony_hildreth@cable.comcast.com
CDOT (Only in CDOT Right-of-way)
970.683.6284 (tel)
Contact: Dan Roussin
Daniel.roussin@dot.state.co.us
UTIL]TY APPROVAL & V€RIFICATION
T|]s1orf]servesio!elr1ylh.r1l|j:]i']|l]p.,st]dii.p|.v.:Jel]lst!ii
ANd VE'IJICAIiON PLEASE ALLOW UP TO ? WEEKS FOR APPROVAL OR COMNlENTS FROI{'THE UTILJ]Y COIIPANIES 1lOU
a.e unable to obtaln cornmcnls wrthtn that ltmcframe pleilse corjlacl The l-ovr|t of Vi]jl
q,,hi^^,.,.^n^a.^.r,-^-^. t) 9q ; lzt"^,, t)-su bdivision: (Lnnri ^$7 E l(ho." l): rotsubjecl Property Atlaress: ./ 2XJ b lKhotn Dt-,Block
Primary ContacUOwner Representative Signature'
NOTES:
1. Utili$, oantrons nust be obli.rned lrktre diqq q.
2. A Revocable Right of Way Perirrt firay be reqLiifed for ary rmprovement-s w lh .l a si.eet nght of-r/ey. acntaat the
Publrc Works Deparlment for ver iicatron 970,.1/9.2198.
L Ii is llre fespo[s brl ty nf th€ u'. ity company arrd the dppircani to reSolve problen]s iclentlfled allove.
4. The Primary Contactl0r'vner Represeniatrve is required io subnrit any revrsed drawt,rg5 to the abcve aqencies ior
re-approval & re verlfcatton lf the submrtted plans;re allefed rn any way atter fhe authorized signatufe date
,()
Authori;ed Sror)aturu Comments Date
CENTURY TEL
"7q.46F 6960(tr tr X l-
970.463.0672{rax)
Conladsr SimuclTooiey
samuel.toolevilcentulyl nk ctf l
XCEL HIGH PRESSURE GAS
970..106.1309 (lel)
970.,+68. i.l0l (fai)
Contact; Ron Bureta
|9 !t!a.l!.u:q!a-!4e&!qqy-!o {r'l
HOLY CROSS ENER6Y
970.947.54/1 (lcl)
970.945."1081 (far)
Conlact; Jeff Vroonl
jv.oomOholycf o5s.acrt
XCEL Ene.gy
970.262 4038 (fax)
970.262.,1050 (tel)
Conlacts: lourse I rm5oI
lsuae-Uols(o4elslqqtisr
IAGL€ R]VER WATER & SANITA.
TION OISTRICT
970..177 5q35 (te )
970,.177.5,134 (fax)
Contact: Tug Birk
<geiulclals
COMCAST CABLE
970.390..1/13 (tel)
970.463 2572 (fax)
Contacti l,lrchael Johnson
f'lichael tohnson(olcallle.comcasl con-l
CDOT (Only rn CDOT Riltht-of way)
970.683.6284 (tc )
Contact: Dan Roussln
Danrel.ro!s5inao\dol.9tatc.cc.|l5
UTILITY APPROVAL & VERIFICATION
and veahcalion PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROI’#I THE UTILITY COMPANIES. If yOu
are unable In obtain comments w~thln that t~meframe please contact The Town of Vail
S{~bject Property Address: / "Z-~(~
Prima~ ConlacHOwner Representative Signature
Authorized Siqnature Dat~e
CENTURY TEL
X 12_
97&,t08,0672(fax)
Contacts: Salnuel Tooley
-~m uel.t(Y3Iey@Fen[urylink.con ~
XCEL HIGH PRESSURE GAS ~~ ~ J
Contact: Ron Bu~eta
HOLY CROSS ENERGY
970,947.5471 (tel)
D70.945,408 } (fax)
Contact: Jeff Vroom
ivroom@hoIycross,~om
XEEL Energy
)70.262A038 (lax)
)70.262.4050 (te~)
EAGLE RIVER WATER & SANITA-
tION DI~RICT
970.477,543S [tel)
970A77.5434 (Fax)
Contact: Tug Birk
CONCAST CABLE
970.390.4713
970.468.2672 (lax)
Contact: Hlchael )ohnson
Nichae Ljoh nson@cable.com~:a st.co m
CDOT (Only in CDOT Right-of-way)
970.683.6284 (tel)
Contact: Dan Roussin
Damel.roassin @dot .state.on.us
NOTES;
~. Utilib/locations must be obtained before digging.
2, A Revocable Right oF Way Permit may be required for an,/mtprovements within a street right-of-way, Contact the
Public Works Department tor verificabon 970,479,2198,
3.It is the respOnsibilib/of the utility company and the applicant to resolve problems identified above.
4, The Primary Contad/Owner Repre~ntative is required to submit any revised drawings to the above agencies for
re-approval & re verification if the submitted plans are altered in any way at{or tire authorized signature date.
UTILITY APPROVAL & VERIFICATION
and verd~calion PLEASE ALLOW UP TO 2 WEEKS FOR APPROVAL OR COMMENTS FROM "rilE UTILITY COMPANIES II you
are unable to obla~n com[nen~s "~,’t~[lln thai I}mekame please conlac[ The ] own of Vail
Prima~ Contac{/Owner Representative: ~’~ ~l~ "~’~C~ Phone:
Prima~ ContacHOwner Representative Signalure
Authorized Siqnature Dat~e
CEI~rTURY TEL97o. 6 .6800(tel)2.
970.,16&0072{i~ax)
Contacts: Sa~nuel Tooley
~a~n]u el.~oole¥@cen u~Iink.com
XCEL HIGH PRESSURE GAS
970.,t0& 1309 (tel)
970.468.1401 (fax)
HOLY CROSS ENERGY
970,9~7.5471 (tel)
970.945.408] (tax)
Contact: Jeff Vroom
XCEL Energy
Q70.262 4038 (fax)
)70.262.9050 (tel)
:ontacts: Louise Tirnson
EAGLE RIVER WATER & SANITA-
TION DISTRICT
970.477,5435 (tel)
970.477.5439
Contact: Tug Birk
COMCAST CABLE
970.390.4713 (tel)
970.4682672 (~ax)
Contact: Hichael Johnson
F1icilae~ johnsqn@cab!e caracas[ con)
CDOT [Only in CDOT Right-of way)
970.683.628~i (tel)
Contac[: Dan Rouss~n
Da n~eLr oussin CR~doL star e co,us
NOTES:
t.Ulility locations mast be obtained [xek)re digging.
2. A Revocable Right of Way Permit may be required for an,/~mprovernents witbi[~ a street right-of way. Contact the
Public Works Department for vel ificabon 970,.t79.2 ! 98.
3.]1 is the responsibility of the utilib/company alXJ the apphcaat to resolve problems idenhiqed above.
4. The Primary Contact/Owner Representative is required [o submit any revised drawings 1o the above agencies for
re approval & re veri£cat~on it the submRted plans are altered ,I any way aRer the authorized signature date.