Loading...
HomeMy WebLinkAboutB12-0257 transmittalTOWN OF VAI Department of Community Development 75 South Frontage Road Vail, CO 81657 Tel: 970.479.2128 www.vailgov.com Development Review Coordinator TRANSMITTAL FORM Use this form when submitting additional information for planning applications or building permits. This form is also used for requesting a revision to building Permits. A two hour minimum building review fee of $110 will he charged upon reissuance of the permit. electrical as -built drawings. Appliwtlon/Permk #(s) information applies to: Attention: Revisions action Response Copy &12 -0257 Martin Haeberle copy of correction letter of Defemetl O Deferred Submittal David Rhodes O Other Project Street Address: 1300 Westhaven Dr (Number) (Street) (Suite #) BuildinglComplec Name: Cascade Resort and Spa Applicant Information (architect, contractor, ownerlowner's rep) Contact Name: ULF and Associates Address: PO Box 509 city Edwards State: CO Zip: 81632 Contact Name: David Hawkins Contact Phone: 970- 376 -0192 Contact E -Mail: david @ulfbuilt.com I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state That all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according I the to ' g end subdivision codes, design review ap- proved, ntematio al Bui and ResitlentIs Codes and other ordinan ble thereto. X OwnedOwnees Representative Signature (Required) For Oeke Use Only: Fee Paid: Reccvetl Fran: Cash Check N CC: visa/ MC tact 4 CC k exp. dare: Authorlabon # Description of Transmii List of Changes, Items Attached: 1) Architect cover letter, structural engineer cover letter, mechanical engineer cover letter, electrical engineer cover letter. 2) Architectural as -built drawings, mechanical as -bulk drawings, electrical as -built drawings. (use additional sheet It necessary) Building Permits: Revised ADDITIONAL Valuations (Labor 8 Materials) (DO NOT include original valuation) Building. $ 178,125.00 Plumbing: $28,400.00 Electrical: $26,275.00 Mechanical: $97,200.00 Total: $ NaN Data Received: