HomeMy WebLinkAboutB12-0257 transmittalTOWN OF VAI
Department of Community Development
75 South Frontage Road
Vail, CO 81657
Tel: 970.479.2128
www.vailgov.com
Development Review Coordinator
TRANSMITTAL FORM
Use this form when submitting additional information for planning applications or building permits.
This form is also used for requesting a revision to building Permits.
A two hour minimum building review
fee of $110 will he charged upon reissuance of the permit.
electrical as -built drawings.
Appliwtlon/Permk #(s) information applies
to: Attention:
Revisions
action
Response Copy
&12 -0257 Martin Haeberle
copy of correction letter
of
Defemetl
O Deferred Submittal
David Rhodes
O Other
Project Street Address:
1300 Westhaven Dr
(Number) (Street) (Suite #)
BuildinglComplec Name: Cascade Resort and Spa
Applicant Information
(architect, contractor, ownerlowner's rep)
Contact Name: ULF and Associates
Address: PO Box 509
city Edwards State: CO Zip: 81632
Contact Name: David Hawkins
Contact Phone: 970- 376 -0192
Contact E -Mail: david @ulfbuilt.com
I hereby acknowledge that I have read this application, filled out
in full the information required, completed an accurate plot plan,
and state That all the information as required is correct. I agree to
comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this structure according
I the to ' g end subdivision codes, design review ap-
proved, ntematio al Bui and ResitlentIs Codes and other
ordinan ble thereto.
X
OwnedOwnees Representative Signature (Required)
For Oeke Use Only:
Fee Paid:
Reccvetl Fran:
Cash Check N
CC: visa/ MC tact 4 CC k exp. dare:
Authorlabon #
Description of Transmii List of Changes, Items Attached:
1) Architect cover letter, structural engineer cover letter,
mechanical engineer cover letter,
electrical engineer cover letter.
2) Architectural as -built drawings, mechanical as -bulk drawings,
electrical as -built drawings.
(use additional sheet It necessary)
Building Permits:
Revised ADDITIONAL Valuations (Labor 8 Materials)
(DO NOT include original valuation)
Building.
$ 178,125.00
Plumbing:
$28,400.00
Electrical:
$26,275.00
Mechanical:
$97,200.00
Total:
$ NaN
Data Received: