HomeMy WebLinkAboutVAIL GOLFCOURSE TOWNHOMES UNIT 28 LEGALTOWN OF VAIL
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL T]MES
MECHANICAL PERMIT Permit #: M95-0063
75 South Frontage Road
Vail" Colorado 81657
303-479-2 I 38 / 479-2 1 39
FAX i03-479-24s2
APPLICANT
CONTRACTOR
OWNER
Description:
INSTALL NEW BOILER
Fir.pta6e Information: Restricted:
Department of Community Developmenr
Job Address. . . : 1620 FU}{pURST DRLocation : UNIT{#28/ GOLFCOURSE T.H.
ParceL No. ... . : 210L\03il/-04-028Project Number: \-/
Status...: APPROVEDApplied.. : 04/2'1 /7995Issued...: 05/01/1995Expires..: lO/28/1995
EAGER BEAVER MECHANICAL Phone:
3549 GYPSUM CREEK ROAD, cIpSuM, CO 81637
EAGER BEAVER MECI{ANICAL Phone:
3549 GYPSUM CREEK ROAD, cypSUM, CO 81637
RUSNAK EARL J JR & KIMBERLY K2 NO LA SAIJIJE 500, CHICAGO IL 60602
Valuation:
fof Gas Logs:
303-524-7337
303-524-7337
10, 000 .00
flof good/Pa L l.et:
****** * FEE SUI'lltARY**ffi*ffi****ffiH
#Of Gas Apptiances:
200.00 Rcstuarant Ptan Revieu-->.00 Total Catculated Fees--->.00 Additional Fees-------->50.00 DRB
TOTAL TEES-----?55.00 TotaI PerDit Fre-------->
Payncnts------'
BALANCE OUE----ffit*ffiffiffiffi ffi ffi *********ffi **#**ffi *ffi ****tr****i***itffi firffi *ffi
llechani ca [---)
Ptln Ch.ck--->
Invest igat i on>
ui tL caLl.---->
.00
3.00
253.00
.00
255.00
Item; -O51OO BUILDING DEPARTMENT05/01/1995 GARY Action: AppRIt.en:. -O54OO PLANNING DEPARTMENTO5/0t/L99s GARY Action: APPR N/A
Dept: BUILDING Division:
Dept: PLANNING Division:
CONDITION OF APPROVAL
***************************r.****************************************************
DECLARATIONS
I. hereby _acknorrtedge that I have rlad-this application, fil,l,cd out in futt the information requi red, conpteted an accurate plot
Plan, and statc that atl the infornation provided as required is corfect. I agree to compl,y riith tire in?onnation and ptot il,an,to.compty uith atl. Toun oidinrncca -and state [avs, and to buitd this structure according io-thc Toun's zoning and subdivisilncodes, dcsign revicv approved, uniform Buitding code and other ondinances of thc Tovn afpticabl,e thereto.
REOUESTS FOR INSPECTIONS SHALL BE IIADE TIIENTY-FOUR HOURS tN ADVANCE BY TELEPIIoNE Af 179-2138 oR AT ouR oFfIcE FRoI{ E:oo AI'I 5:OO PI'I
SIGI{ATURE OF OUNER OR CONTRACTOR FOR HIITSELF AND OI,INER
,rafi,irr
&a#*
TOWN OFVAIL
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE
MECHANICAL PERMIT PETNiI
AT ALL TIMES
M9s-0063
75 South Frontage Road
Vail, Colorado 81657
303 -479-2 I 38 / 479-2 I 39
FAX 303-479-2452
Job Addresa... z 1620 SITNBURST DRLocation : I,NIT #28 GOLFCOURSE T.H.Parcel No..... : 2101-091-04-028Project Number:
Department of Comnuniry Development
Status...: APPROVED
Applied. .. : 04/27 /L995Issued...: 05/0L/1995Expires..: Lo/28/1995
APPLICANT
CONTRACTOR
OWNER
Description:
INSTALL NEW BOILER
Fircp[ace Infornation: Restricted:fof Gas Apptiances:
Restuarsnt PLan Revieu-->
DRB Fee---------
EAGER BEAVER MECHANICAL Phone:
3549 GYPSUM CREEK ROAD, cypsuM, CO 81637
EAGER BEAVER MECHANICAL Phone:
3549 GYPSUM CREEK ROAD, cypSUM, CO 81637
RUSNAK EARL J JR & KIMBERLY K2 NO LA SALLE 500, CHTCAGO IL 60602
Valuation:
#0f Gas Logs:
303-s24-'1337
303-524-7337
10, 000 . o0
#0f lfood/PaL l.et:
********t*f,****,h*rrt**t*ffr{-***lr#(*ffiffi*Hrr***rri* FEE SUlllilARY #r*Hrffi***ffi*
l,lechani cE [--->
PLan Chcck--->
Invcst i gation>
Ui l. L Ca L t--->
200.00
5 0.00
.00 Totat Catcutated Fees---)
.00 Additionlt Fees------->
25 3 .00
.00.OO TOTAL FEES-_--
3.@
Totat Pernit Fee-----> 255.00
Paynents------
Dept: BUILDING Division:
Dept: PLANNING Division:
253.00
BALANCE DUE-_-
|t*lrffi*ffiffi*ffiffi,Hrht*ffiffiffi,ffiffiffi
]tem: ,O51OO BUILDING DEPARTMENTo5/OL/L995 GARY Action: APPRItCn:'.O54OO PLANNING DEPARTMENT0sl01/1995 GARY Acrion: APPR N/A
CONDITION OF APPROVAL
*************************************************************drr.L****************
DECLARATIONS
I.hereby €cknovtedgc that I have read this apptication, fiU,ed out in ful.l, the information requi ned, conpteted an accunate ptotplan, rnd state that atl the informEtion provided as required is correct. I agree to conpty riith the information and pl,ot il,an,to.comPty Yith at[ Toun ordinances.and state taws, and io buil,d this structure according iothe Toun,s zoning and subdivisibncodes, design review approved, uniform Buil.ding Code and othrr ordinances of the Town aipl.icabl,c thereto.
REQUESTS FoR INSPECTIONS SHALL BE I'IADE TIJENTY-FC{,IR HolrRS IN ADVANCE BY TELEPHoNE AT 47F213E OR AI OUR OFFTCE FRo S:OO Al't 5:00 Ptt
SIGNATURE OF OI,NER OR CONTRACTOR FOR HIIISELF AND OI,INER
,raffuinr
&asr*
PER}IIT /I
PERI.IIT APPLTCATToN FoRMDATE! 04-27-95
, APPLTCATTON MUsr EE FTLLED our coMpr.ETELy oR rr litAy Nor BE AccEprEDrf
x* ******* ***************:l ***** PERMIT TNFORMATION ****************************!rrl|[ ]-Building [ ]-prunbing [ ]-Electrical [x]-uechanical [ ]-other
Job Name:c"Ifco"r"" T"r"h"* Job Address: 1635 colf Terrace
Legal Description: Lot Block_ riling
Owners Name: Earl J. Rusnak, Jr. Address: 2 North Lasalle_Ste. 500 p1.
Architect:ffi
Address:Ph.
General Descriptiens InstaII New Boiler
Oro* oF vArL coNsrRucrrop
9-Work Class: [ ]-New [x]-Alteration [ ]_Additional [ ]-Repair [ ]-other
Nunber of Dwelling Unitsl _1 Number of Acconrnodation Units:
1[*"t
and Tlpe of Fireplacess Gas Appliances
llf* * * * * * * * * * * * * * * * ** * * * * * *** * *** ** * vALUArroNs
Gas Logs_ Wood/pellet
*********************************
BUILDfNG: $EIECTRICAL: $OTHER: IPLIIUBTNG:
I***** ******** * ******fEeneral Contraccor:
r{EcHANrcAr,,: ST;6'66:6.d iord; S-
******* co*rRAqro* t:]******** *-,ffi
Address:Town of VaiI Req. NO.Phone Nurnber:
Town of Vail
Phone Nunber:
Town of Vail
Phone Nunber:
************ ****
Reg. NO.
Electrical Contractor:
Address:
Plunbing Contractor:
Address:Reg. NO.
Mechanical Contractor. Eager Beaver Mechanical Town of Vail Reg. NO.179-MPhone Number: SZq-lZTAddress: 354? Gypsum Cre@
::::::::.::::::.:::************* FoR oFFrcE usE *******************************BUTLDTNG PERMIT FEE:
PLIruBING PERI,TIT FEE3
MECIIANTCAL PERMTT FEE:
ELECTRICAL FEE:
OTHER TYPE OF FEE:
DRB FEE:
BUTLDTNG PLAN CHECK FEE:PLUI'IBING PI"AI{ CHECK FEE:
I'TECHANTCAL PIAN CHECK FEE:
RECREATION FEE:
CI.EAN-UP DEPOSTT:
TOTAIJ PERMIT
BUTLDTNG:
SIGNATURE:
ZONING:
SIENAIT'RE!Cornments:
CI.EAIT I'P DEPOSIT IEFITI{D TO:
^
TO:
FROM:
DATE:
RE:
MEiIORANDUI,/|
ALL CONTRACTORS
TOWN OF VAIL PUBLIC WORKS DEPARTMEhIT
MAY g, 1gg4
WHEN A..PUBLIC WAY FERMIT'IS REQUIRED
JOb Name: Golfcourse Townhome #28
Datel 04-27 -95
Please answer lhe following questionnaire regarding the neecl for a 'public Way permit':
YES NO
x1) ls this a new residence?
2) ls demolition work being performed
that requires the use of the right
of way, easements or public propefiy?
3) ls any utility work needed?
4) ls the driveway being repaved?
5) ls different accEss needed to site
other than existing ddveway?
6) ls any drainage work being done
affecting the right of way, easements.
or public propeny?
7) ls a'Revocabte Right CI Way permit"
required?
8) A. ls the right of way, easemenls orpublic property to be used for staging,
parking or fencing?
B. lf no to 8A, is a parking, staging
or fencing plan required by Community
Development?
lf-ygY. "Ty.r9d yet to any olthese questions, a "Public way permit'must be obtainEd."Public way_ Permit' applicationl miy be obtained a the'public work,s ofiice or at
9:.TTulitv Development ff you n-1ve-any euestions please call Chartie Davis, the Townof Vail Construction Inspectoi, at 479-Z1Sg.'
I have read and answered allthe aboygquestions.
corrcours. ro*nno^" #28 6nt-* t^ 0rA*.
X
x
x
x
x
x
Job Name Contracto/s Signature Dale
04-27 -95
I pueuc wav penur pnoceO
How it relates to Building permit:
1)grmit a lication.
2)
3)
4)
5)
6)
7)
lf yes was answered tg 3ny of the above questions then a "pubric way permit isrequired' You can_pick !o ?n app'cation at either community Deveropment,located at 75 s' Frontage Road or piori" worr.r, rocateJaiJ'ibi'v"irVal6y Drive.
Notice sign otfs toJ qirty companies. Ail utirities must fierd verify (rocate)respe'ive urifities priorro signinj apptication. som;
"tiiiry-;il;nies require upto a 48 hour notice to schedute I driatei.
A construclion rrattic.ontror pran must be p_repqe.d on a separate sheet of paper.This pran wiil show rocationi or arrtiiinc &niroroevices tsig;J,-*nrr, Erc.) andthe work zone, (area of construstion, Ji"ging, ,t".;
sketch of work beinq performed musr ue 1o3i!ef indicating dimensions (rength,width & depth or *j6. ni" ;;il;.,ii;n on the trafftc bntror pran or a sireplan for the job.
submit compreted apprication to the pubtic-{grk'. otfice for review. tf required,rocares wiil be schedured rorrhe rown Jivar ErdH;;iii riiir"tion crew. Thefocates are take ptace in trre mominj, Out'i"y require up to 4g h-ours to perform.
The Pubric work's congtrygtion Inspector wil_leviey rhe appricarion and approveor disapprove the perm.it. You witf tiJconi"ieo as to th; .iJt* iro any changesthat may be neEded. Mosl permiis "i*"r""rro within 49 noro JLing received,but please allow up lo one week to process.
As soon as permit is Drocessed, a copy wiil be faxed to community Deveropmentafrowing the 'Buirdino p-.lPir rd u" i56"."i. a""., do not contuse the ,pubricway permir wirh a "-Builoinj p;;r1;i;;iork on a project sire itserf.
Note:
'The above process ls for work in a rlght-of_way only.
'Public Way permlt,.
"r
'A new public Way permit is required each year.
lnttn
75 routh tronttgc rold
nll, colorrdo Et657(303) 479-2138 or 479-2L39 olflcc of conlnunlty dcrlopncnl
BUILDiNG PERI.|IT ISSUANCE TII,IE FMME
If thi.s permit requires g Towl 0f vair Fire Department Approva.r,Engineer''s (Public |9*:l review ani'ipproval, a ptannin!. Departmentrev i ew or Hea I th Departm6nt.
"eu
ierr, -.ni'.-
".ni"; ;i- ffi ";rTt ai n9
SSol[H!"h.lL: "r.t*ted time tor'a-totar
"euil* i"v"Li!'.s tons
A'll connerciar ('rarge or sma]]) and ail multr-famiry permits wilrhave to follow ihe ibove il;iionil-ririrur reguirements. Residentiarand sma'l'l projects should trie i-ieiier"amount of time. However, ifresidential or smal'r er,projecis-inpi.t' tne various above mentioneddepartnents with regard to-rii"siily-".ui"n, these proJects mayalso take the three week period.
Every.atternpt will be made by this deparurent to expedite thispemi't as soon as posslble. - ee s'\Fs.' us r'r
I, the
frame.
undersigned, understand the plan check procedure and time
o4-27 -95
Corrnuni ty Development Department.
luttn
75 routh tronlagc ro.d
vail, colorado 81657
(303) 479-21,38 or 479-2139
TO:
EROM:
DATEI
SUBJECT:
rn sunmary, ordinance No. 6 states that it is unlawfur for anyperson to ritter, track or deposit ;t:;irl-tJ.i, sand, debrisor material, i""a:liln_trastr iunpsters, portable toilets andworknen vehicles. upon any streetl sidewalk, alley or publicBJ?:"_::_aly porEiln trr"i"";:--;i" risht_of_way 6n art rown ofvar'r streets and_.r9"-d= is approiir.l"iv-s-it]-lti pavenenr.This ordinance wirr be "t"iElry"enforeed by trre Town of vair.Public l{orks oeoarturent. --p.i3lnl rouna .ri.l,filing this ordinancewilr be siven a 2{ hour r.ii;;;';"ii""-t"*;;;;;"="id nateriar.rn the event the person so notified does-";;-;;;ply with thenotice within .o:_31 nJ"i-tii"-Jiecitied, the puf,r:.c worksDepartment wilr rernore said r"t"iiii-it-iuJ'E"ili=" or personnotified' The nrovisioni-or-till orotnance sharr nor beappricabre to c-onstruction, -r.irr["rr"nce or repair projects ofany street or arley or i'y'otili;r;;"i; ;;"';i;ii_._""r.
To review Ordinance No. 6 in futl, please stop by the Town of:::i"::ii3i"g"TH?*n:*"::""iiii" a eopv. rirani. you ror your
oftlee of communlty dcvelopmcnl
AIL CONTRAqTORS CT'RRENILYL REGISTERED T{TTH TIIETO}IN OF VArL
TOI{N OF VAIL PUBLIC r{ORKS/COU}![ NITy DEVEr.,OP!!ENT
IifARcH 16, 1988
CONSTRUSIION PARKING & MATERIAL STOR,AGE
knowledged
Mechanical ContractorositionTaeTiffii'Sf!
? 04_27_9sF
(i.e. contractor, owner)
httn
75 roub lrontege med
vrll. cdqldo 81657
Fqt) 47$2138
(3G) 47$2139
otfice of communlty development
NOTICE TO CONTRACTORS/OWIIER BUILDERS
Effective June 20, rggt, the Town of vair Buirding Depart,ment hasdeveloped the following procedures to ensure tttii ".r constructionsites h-ave adeguatery-eltabtished^propet arii'age rrom uuirdinjsites along and adjacent to Town of vaiL roads oi streets.
The Torn of vair pubric worka Department will be reguired toinspect an9 approve drainage adjaclnt to rown of vail roads orstreets and tbe installation of t-euporary o, 1-r**ent curverts ataccess points from the road or street on to tire construction site.such approval must -be o.ltaj-ned prior to any request for inspectionby the Town of vair nuilding Department for tobtings or temporaryelectricaL or any. ot.her inspection. preasl--..rr 4-t9-2160 torequest an inspection from the pubric works Department. AJ_row aminimum of 24 hour notice.
ALso, the Town of vait pubric works Department wirl be approvingall fi-nal drainage and culvert install-ation with resurting roadpacching as necessary_. such approval must be obtaineo prioi -io
Fi.na1 Certificate of Occupancy iisrrance.
o
D e p ar tn e nt of C omnu n i u^ Dev e lo p n e n t
rlFoRl'lallor IEEDED mtEt APPr.lrrc roR A uEcHAltrctr. pEnurt
1
2.
75 South Frontage Road
Vail, Colorado 81657
303479-2138 / 47e-2r 3e
FAX 303-479-24s2
TOTTN OFVATL
3.
4.
HEAT LOSS CALCULATIONS.
TO SCAI,E FI.,OOR PI,AN OF MECHAIIICAL ROOM WITH EQUIP}IENT
DRAVIN IN TO SCAI,E, WITH PHYSTCAI DII,IENSIONS AND BTURATINGS OF ALL EQUIPI'IENT IN MECITANICAL ROOM.
sHot{ sIzE AND LOCATION OI' COMBUSTION AIR DUCTS| FtuEs,VENT CONNECTORS AND GAS LINES.
NOTE WIIETHER ELEVATOR EQUIPUENT WILL ALSO BE INSTATLED INMECHANICAT ROOM.
FATLURB ro PRovrDE rllrs rrFoRl{arrof, wxr.L DEr.at rouR pERlrtrr.
fe
Iuwtr ul Varl 0,:mrnunttv
Develooment
r;;:-:..,e3DoDD
l:::ilCDtr=tr
Validtty ot psrml?
Sr,e. 303 (c) 't9 U.B C.
o |\\,F\
rE\t.--VButldPlen.
\
TJ
c\.
P\)
BA.
\c\c
\\\ K
<_1 ,JJr>-
t-r
\>.(.
F\.\
\\
I
i"' t-- -' -.\.-- -rF-r-;rr
l.u'
l,\e Bl r.r.nra cr gf?Fl:..,Q li a 1gr;ii itf irlii,.ti.il r;.1 r.i:-!t.:.i.3j'jr',r;iir.:.i j.ji:s :lr:li it0t be coirsifusi t! Lrr; a.... .. ,.:. ..j isrilt'-.viti 0i, any vic.iaiitn ol arly 0l ile pillri,.,.,;: {.1 .;;l] itrS€cr cl zny orher ordinancc of tnd jurisdicbtiun. t i e liiu;isa ofa Fermit based upon plans, speciiications anc of,e, oati ina,lnor pievEnt thc buildjng officjal from thereaner reQuirinc the;0rr6crron 0t errors in said plans, specilications and 6tne,.Jata. "
OATF:
.,
J
Tovrn cf \reil
#fl;!';il i-;*PY
,{/"&7tt-zo-oz
o
TIIISNOTEs
Job Address...3 1620 SUNBURST DR
I-,ocation. 3 UNIT #28 GOLFCOITRSE T.H.
Parcel No.....: 2101-091-04-028
Project Number:
APPLICANT
CONTRACTOR
OWNER
PERIIIIT UUSE BE POSTED ON
!{ECHANICAI, PERMTT
JOBSITE
Perrnit
AT ALL TII,IES
#: M95-0063
Status...: APPROVED
Apptied..: 04/27/L995
Issued...z o5/oL/L995
Expires..: LO/28/L995
Description:
INSTALL NEW BOILER
Fireplace InforrEtion! RcetPicted:#0f cas App[ i ances:
EAGER BEAVER MECHANICAI-, Phone:
3549 GYPSttl,t CREEK RoAD, GyPSUU' CO 81637
EAGER BEAVER MECHANICAL PhONE:
3549 GYPSLTM CREEK ROAD, GYPSUI!, CO 81637
RUSNAK EARI-, J JR & KIMBERLY K
2 NO IA SAL,I;E 500 ' CIIICAGO IL 60602
Valuation;
*of Grs Logs:
303-524-7337
303-524-7337
10, ooo. oo
#0f tlood./Prt tst:
tartp1aa,l*11rp*lg*f1all*ttat1rrttta*iat*ttttlra*ltt**hll FEE Stfiil RY li*at*rF*tllrt'stttiiirE*****trF!ttttt*st**t*tttt**tttt't
llechanicat"'> 200.00 Restuarant Ptan Revier"> '00 rotal catcutated Fees--'> 253'00
plan check---> 5O,OO Dt8 Fe6----------:--:---> .00 Additionat Fees--"--"'> -00
tnvestigation> .OO TOTAL FEES'----
$itt catt"'-> 3.00 Paynents-"---'
BALAIICE OUE-.. -
*t*t*tttt*.ttfia******i*r*t'attitt**t+****tit***att**t*i*t*ti*a**t**itt**ttt**ll***tlat*i*it*ttt*tatt**tt***l*ltitt*tt***:lil***l***tt*
Item: O51OO BUILDING DEP.ARTMENT-O5/OL/L995 GARY ACtiON: APPRIt'em:' 05400 PLANNING DEPARTI'IENTos/ot1lss5 GARY Action: APPR N/A
Dept: BUILDING Division:
Dept: PIANNING Division:
CONDITION OF APPROVAL
******************************t **Jr**********************************************
DECLARATIONS
t hereby acknort edgc thlt t h€ve nead this eppt lcetlon, filted_out in futt the infofnation required, conpleted an accurate plot
it"i, "ia siite tlit a f t tfre' inionmii m p"oiiaca "" liari 14. i." correct. I agl.€ to cdptv tri th the I nforflat ion ard ptot plan,
to co1pty rith alt ro* or<iin"rciJ "tta
stlte tars, and do buitd thie stnrrture according io the loHn'8 zming snd stidivision
codes,'design reviex approved, Unifonn Buitding Cide ard other ordlnances of thc Tom aPpticabte thereto'
REouEsrs toR tspEcTtoils sHAtL BE ti DE TuEl|ly- torJR lcuRs lll ADvAllcE BY IELEPHoIIE Al 479'2138 oR Ar ouR oFFrcE FRdl 8:00 At{ 5:00 Pll
STGIAIURE Of TT,IiIER OR COITRACTff FM HIISELI AXD (l ER
o
NAME:GOLF COURSE f .H.*28
ADDRESS: 1635 GOLF TERRACE
VAIL, COLORADO
OCCUPANCY: R3
TYPE OF CONSTRUCTION:V
CORRECTIONS REQUIRED
The items listed below are not, intended to be a complete J.isting
of all poseible code requiremente in the adopted codea. It ie aguide to eelected eections of the codes. The following iE not to
be congtrtred to be an approval of any vioLation of any of the pro-
viaione of ttre adopted codes or any ordinance of the Town of Vail.
1) CoMBUSTION ArR IS REQUIRED pER SEC.507 OF THE 1991 UMC.
AT LEAST ONE COMBUSTION A]R DUCT MUST BE TAKEN FROM THE
OUTSIDE.
2) ACCESS TO HEATING EQUIPMENT MUST COMPLY WITH SEC.5O5 and 703
OF THE 1991 UMC..
3) INSTAII,ATION MUST CONFORM TO MANUFACTURES INSTRUCTIONS AND TO
APPENDIX CHAPTER 21 OF THE 1991 I]MC. ]F MANUFACTURE SPECS
REQUIRED A COND]TIONED SPACE FOR THE USE OF SINGLE WAT,L VENT
THEN GARAGE MUST BE HEATED.
4) GAS LINE TEST AND INSPECTION IS REQUIRED BEFORE CONNECTION
OF ANY EOUTPMENT PER SEC.L2O6 OF THE 1991 UPC.
5) GAS APPLIANCES SHALL BE VENTED ACCORDING TO CHAPTER 9 OF THE
1991 UMC AND SHALL TERMINATE AS SPECTFIED IN SEC. 906 OF THE
1991 UMC.
5) DRA]NAGE OF MECHANICAI ROOMS CONTAIN]NG HEATING OR HOT-WATER -
SUPPLY BOILERS SHALL BE EQU]PPED WITH A FLOOR DRAIN PER
sEc.2119 0F THE 1991 UMC.
7I BOILERS SHALL BE MOUNTED ON FLOORS OF NONCOMBUSTIBLE
CONSTRUCTION UNI.,ESS LTSTED FOR MOUNT]NG ON COMBUSTIBLE
FLOORING.
Plan Rewiew Based on
the 1992 Uniforrn Codes
Town of t[X
CFFICF COPY
DATE:5/l/95
CONTRACTOR : EAGER BEAVER MECH
ARCHITECT: NONE
ENGINEER: NA
PI,ANS EXAMINER:C. FELDMANN
o
8) FIELD INSPECTION ]S REQUIRED FOR CODE COMPLIANCE PER SEC.3O5
OF THE 1991 I]MC.
9) PERMIT, PI,ANS AND CODE ANALYSIS MUST BE POSTED IN MECHANICAL
ROOM PRIOR TO AN INSPECTION REQIIEST.
*
{dqyet*'r)
/ 1_,:f 5-e t l,_-/T3t,
CTION REQUESTWN OF VAIL
479-2138
JOB NAME
READY FOR
LOCATION:
TUES WED THUB '6-r.>
i. ", 1: I'
BUILD!NG:
tr FOOTINGS,/ STEEL
PLUMEING:
tr UNDERGROUND
tr FOUNDATION / STEEL tr ROUGH / D.W.V.
tr ROUGH / WATERtr FRAMING
_ ROOF & SHEER" PLvwooD NAtLtNc ! oo. PTPING
tr INSULATION
tr SHEETROCK
tr POOL / H. TUB
NAIL tr
n
tr
tr
tr FINAL FINAL
.1.
ELECTRIGAL:
tr TEMP. POWER
MECHANICAL:
tr ROUGH
tr HEATING
tr EXHAUST HOODS
T] CONDUIT tr
.:
tr
u
SUPPLY AIR
tr i:.a, iv I
tr FINAL FINAL
YAPPROVED tr DISAPPROVED tr REINSPECTION REQUIREDI
CORRECTIONS:
DATE INSPECTOR