HomeMy WebLinkAboutVAIL VILLAGE FILING 13 BLOCK 2 LOT 10 LEGALf.
Design Review Board
ACTION FORM
Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel:, 970.479.2L39 fax: 970.479.2452
web: www.ci.vail.co.us
Project Name: SHAPER RESIDENCE DRB Number: DR8040267
Project Description;
CHANGE TO APPROVED PLANS (RETAINING WALLS)
Participants:
OWNER SHAPER, STEPHEN & SUE Z. 06/1/2004 Phone:
325 RIPPLE CREEK
HOUSTON TX
77024
License:
APPLICANT CoHENCONSTRUCTION 0611712004 phone:970-926-3443
P O BOX 1889
EDWARDS CO
81632
License: 123-B
CONTRACTORCOHENCONSTRUCTION 061L712004 Phone:970-926-3443
P O BOX 1889
EDWARDS CO
81632
License: 123-8
ProjectAddress: 2645 BALD MOUNTAiN RD VAIL Locauon:
2645 Bald Mountain Road
Legal Description: Loil 10 BlocklSubdivision: VAILWLT-AGE FI|ING 13
Parcel Number: 210103401027
Comments:
BOARD/STAFF ACTTON
Motion By: Action: STAFFAPR
Second By:Vote: Date of Approval= 061301200a
Conditions:
Cond: I
(PLAN): No changes to these plans may be made without the written consent of Tonrn of
Vail staff and/or the appropriate review committee(s).
Cond: 0
(PLAN): DRB approval does not constitute a permit for building. Please consult with
Town of Vail Building personnel prior to construction activities.
Cond: 201
DRB approval shall not become valid for 20 days following the date of approval.
Cond:202
Approval of this proJect shall lapse and beome void one (1) year folloruing the date
of final apprwal, unless a building permit 's issued and aonsfuuction ls omnenced
and is diligently pursued tolard compledon.
Cond: CON0006530
The applicant shall submit PE stamped, englneered wall drarvirps for both the
existing and propced reblnlng walls to the Torvn of Vail Publ'lc Works Depafinent
for review and appronl.
Ptannen BillGibson DRB Fee Pald: *2O.OO
'1.tr'l***'t**'1.****!************l'r'*****,t{r{.******'}***'tr*++***r*'**'t*:t **a':t*'tIf 'f *x****:tr*********!t,t**:****
TOWNOFVAIL, COLORADO Sratement
*rN.*'r*'l:lt**'t*{.***,i:1.**'*+***{.*'N.***:i't**'t*t t$* *:t {r '* ** *'} !t +{rt * 't *:N. **** * 't * *+*'t{r***:1. * * **
'tt
rt ****'t * ** * * ****'}.
Statement tilurdrer: R04o00G045 Arnount: 920.00 06/71 /ZOO4O9:43 AlI
Pa:ment Method: Check Init : rfS
Notation: #10545/COHEN
coNsT, rNc.
Permit No! DR8040267 Type: DRB-Chg to Appr plars
Parcel No: 21010340102?
SitC AddrCSS: 2545 BALD MOI'NTATN RD VATI.,
Locatsion: 2645 Bald Mountain Road
Tota1 Feea: $20.00This Palment: $20.00 Total ALL, prnts: $2o-OO
Balance: $0.00
{r'lrlr'*t"t**f {.!t,}**1.t ******a*****r.*'t *r*****+***'t*****r.r.***rt:t :ttt**li*.ir'}**:*:}******t+*{'*t*{.*'}'r*x(*******
ACCOI.]NT ITEM LIST:
Account Code DescniDtion Current Pmts
DR OO1OOOO31122OO DESIGN REVIEhI FEES 20.00
Botanical Name
PROPOSED I.ANDSCAPING
Common Name quantih,Size
PROPOSED TREES
AND SHRUBS
PXIfiNG TREES
TO BE REMOVED
/sja g7i
Minimum Requirements for Landscaping:Deciduous Trees - 2" Caliper
Coniferous Trees - 6' in height
Shrubs - 5 Gal.
Square Footage
GROUND COVER
SOD
SEED
IRRIGATION
fiPE OF EROSION CONTROL
Please specifo other landscape features (i.e. retaining walls, fences, swimming pools, etc.)
Tvpe
Page 7 of l2l12l07l02
UTILTW APPROVAL & VERIFICATION
This form seryes to verify that the proposed improvements will not impact any existing or proposed utility
services, and also to verify service availability and location for new construction and should be used in
conjunction with preparing your utility plan and scheduling installations. A site plan, including grading plan, floor
plan, and elevations, shall be submitted to the following utilities for approval and verification.
Authorized Comments Date
Siqnature
QWEST
970.384.0257(fax)
Contacts:
Scott Carrington 970.468.6860
Jason Sharp 970.384.0238
EXCEL HIGH PRESSURE GAS
970.262.4076 (tel)
Contact: Rich Sisneros
HOLY CROSS ELECTRIC
970.949.5892 (tel)
970.949.a556 (fax)
Contact: Ted Husky
EXCEL ENERGY
970.262.a038 (fax)
Contacts:
Kit Bogart 97 0.262.4024
Jim O'neaf 970.262.4003
EAGLE RIVER WATER &
SANITATION DISTRICT
970.a76.7a80 (tel)
970.476.4089 (fax)
Contact: Fred Haslee
COMCAST CABLE
970.949.L224 x 112 (tel)
970.949.9138 (fax)
Contact: Floyd Salazar
NOTES:
1. If the utility approval & verification form has signatures from each of the utility companies, and no comments
are made directly on the form, the Town will presume that there are no problems and the development can
proceed.
2. If a utility company has concerns with the proposed construction, the utility representative shall note directly
on the utility verification form that there is a problem which needs to be resolved, The issue should then be
detailed in an attached letter to the Town of Vail. However, please keep in mind that it is the responsibility of the
utility company and the applicant to resolve identified problems.
3, These verifications do not relieve the contractor of the responsibility to obtain a Public Way Permit from the
Department of Public Works at the Town of Vail. Utilitv locations must be obtained before diogino in any public
right-of-way or easement within the Town of Vail. A buildino permit is not a Public Way oermit and must be
obtained separatelv.
The Developer is required and agrees to submit any revised drawings to the utilities for re-approval & re-
verification if the submitted plans are altered in any way after the authorized signature date (unless otherwise
specifically noted within the comment area of this form).
Develope/s Signature Date
JLj--a,g-Aaa+ 15:56 H-P EEU IEUH
c&Ftecr'
'"'EPWORTH
- PAWLAK GEOTECHNICAL
Jui" 8, 2004
Stcvc Shaper
c./o Segerberg MaYhew Architects
Al.trr: Kutl Segerberg
I0()0 South Frontage Road Wcst
Suitc 300
Vail, Clolorado 81657
?,4t/05
Ht:pu,rri i,.l':rn iei {icot,'c irrlcll. jnr:
5r,)l(i t'-r.rr.rn' li..r.'rii ! i4
( j l cnrur',.',-; .inr in g.,. t. i rir:,.:rs, . $ l 6!-\ l
Ph,:r;rr. i,7i'..tj,i .7i)$$
Fur.: Q7i' :).i i -i4ii
cnuii: hpgr,, ,@;hpgrlte.;lr,, rtn t
.lob Ncr. 104 321
Sub.leot:
Gcntlctrreu:
Recornmenclations fbr Bouldcr Wall Above Residence at 2645 Bald
lvlountain Road, Vail, Coloradtr
U0: t tatl ko{ to,B(( z
As requeste4 by Pete Vcntres of Cohen Construction-, e repre-sentalive ol'Flepwoftlr'.
pa1vla'k Geotecirnicat, Inc, observed the existing boulder wall and hillside at the suhject
,site 9n July 6, 2004. An additional boulder wall is proposcd abovc the existhrg onc as
slope treatment.'fhc findings of our observations.and recortrtnr:ndaliols for the boulder
wail desigr are presented in this repolt' 'l'he scrlices were perfomred 's a-slil4:'lenlent lo
,r,,, ogru"in.tlt for professional engineering services to Steve Shapcr, dafed Ap$l 21 .
20(.t4,
The uroooscd houlder wall is located to the not'theast of the resiclence and will he 4 lbet
high'and about 30 feet long. Thc cxistinghillsjde fpPcars to havc lreen cul lofie very
srccrr grirde by prior develirpment qf the lot, The slope abovc tlrc ncw wall rviJl be
flarrln'.a k> 2'hirizontal to I vertical. 'l'he existing wall is about 4 fcct high and located
r,r,itirin about 5 I'eet of thc residence.
I'hc hillsicle appears to consist of coarse Eauular soils ancl is rvell drainecl. l'here are no
i',Oi.otionr of mas.liue slope failure. I'hclccornmeude<J secliorr lirr thc ncw Lrouider wdl
is sh.r*n on ligu-e 1, attaihed. If variations in thc subsurface conditjons are encounlercd
6rrri,.,g excavatilon or if tJre wall construction changles, wc should be cottlacl.cd lirr lurthcr
t'eview.
I1'ypu lravc any qucstions qr necd further iusiStance, please call ortr gfJice.
Siucerely,
iI[,PWOR'I'I-I -PA ,, tNc.
Stcycl L. JJawlak, P
SLP/ksw
aflachtnent Figurc l-DetaiI
Chhen Constructi tres (via fax: 926-3440,1
15222
llt/"1
Parker 303-841-7119 . Cc,loradoSprings 719-63.3-5562 . Sih't:rrhorrre 970-46$.19E9
JUL-AEF?hAA 15:5?H-P GEOTECH P.A3/43
PROPOSED
CUT SLOPE
1' MINIMUM
sorL colER
FILIER
FABfuC (TYP.)
1-l
MINIMUM 1' T1IICK
-Jl4" DRATN
GRA\EL (TYP.)
F_._+1' MlN. 2/3 H
.+" e
SLOPE TO
DRAINPIP€
DA]4-IGHT
EXISTING
WALL
RECOMMENDED
BOULoER WALl- sEcTlott
2645 BALD MOUNTAIN ROAD
ffiFtr?y -- u6{: 15222 .:'--?nJ/"/"t gi
Qffr:l[-rD
Figure tTYPICAL BOULDER WALL DETAILHEPWORTH-PAWLAK
GEOTECHNICAL. INC.104 321
tuL-at-zae4 ls:s?H-P GEOTEC}I P.43/43
PROPOSED
CUT SLOPE
__-lr 1' MINIMUM
sorL co\ER
FILIER
FAERIC (TYP.)
lz
MTNIMUM 1, THICK
-3/+' DRIIN
GRAIEL (TYP.)
4" 9 DRAINPIPE
SLOPE TO DAYIIGHT
(- ,.r. ' (-.-.- -v, '
EXISTING
WALL
RECOMMENDED
BOULoER w^tl- sEcTloi.l
2645 BALD MOUNTAIN ROAD
f.'#bl:4Y -- uoZ
: | 5222 .:
".?*1"/"-l ei
Kff'r;l,i$P
Figure tTYPICAL BOULDER WALL DETAILHEPWORTH_PAWLAK
GEOTECHNICAL. INC.104 321
i
TOWNOFVAIL
75 S. FRONTACE ROAD
VAIL, CO 81657
970-479-2138
a DE'ARTMENT oF coMMU*,r" Orro ,rt*rlfo,lruur(,b32
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALT SFR BUILD PERMIT Permit #: 800-0291
Job Address: 2645 BALD MOUNTAIN RD VAIL Status . . . : ISSUED
Location.....: 2645 Bald Mountain Rd Applied . : 10/17/2000
Parcel No...: 210103401027 Issued. .. : 10i 18/2000
Prqject No t 7t(7AO-dJ0/ Expires . ..: 04/16/200r
OIINER SHAPER, STEPHEN & SUE Z. L0/1,7/2O00 Phone:
325 RIPPLE CREEK
HOUSTON TX
71024
CONTRACTOR PLATH CONSTRUCTION L0/L7/2000 Phone: 970-949-1905
P.O. DRAWER 5920
AVON, CO
eL620
License: L48 -B
APPLICAIIT PLATH CONSTRUCTION L0/1"1 /2000 Phone: 970-949-!905
P.O. DRAWER 5920
AVON. CO
8]-620
Description :Instill a new shake roof to replace the exisiting sod roof
Occupancy: R3 Single Family Residence
TlpeConsfruction: VN TypeV Non-Rated
Valuation: $28,637.00 Add Sq Ft: 0
Fir€place lnfomalion: Rcsbictcd: Y # ofGas Appliances: 0 # ofGas Logs: 0 #of Wood Pcllet 0
FEE SL-IVIMARY
Building-> S343 , oo Rsstuarant Plan Review->
Plm Check--> 5222 .95 DRB Feo----------->
$0. oo Total Calculaled Fcas-> $618.95
S5o.oo Additional l'ees-----> (S20.00)
90. 0o Total permit Fe€_> SS9g . 95
50.00 Pa1,men15_*---*--1 5598.95
Invedigalion->
wifl cell->
S0 - 00 R€cr€alion Fe+-_-->
53. oo Clean-up Deposit----->
TOTAL FEES------*-> $618.es BAr.Ai$CE DUE--> S0.0o
Approvals:Item: 05100 BUILDING DEPARTMENT
L0/1,7/200O CDAVIS Action: AP
ltEM: O54OO PLANNTNG DEPARTMEIIT
Item: 05600 FIRE DEPARTMENI
Item: 05500 PUBLIC WORKS
,*,t+++***** I*tt**|*,i
See page 2 of this Document for any conditions that may apply to this permit.
DECLARATIONS
i f,.r"O, u.,*o*ledge that I have read rrri, fi[*ti* filled out in full the informati* rct n *roleted an accurate plot plan, and
state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town
ordinances and state laws, and to build this struchre according !o the towns z
Uniform Building Code and other ordinances of the Town applicable thereto.
REQTJESTS FOR INSPECTION SHALL BE MADE TWENTY.FOUR HOURS IN ADVA}.ICE
Send CleaFup Deposit To: PLATH CoNSTRUCTION
oning and subdivision codes, de
OR AT OUR OFFICE FROM 8;00 AM - 5 PM.
CTOR FOR HIMSELF AND OWNER
mrnnuomer+zy'zr
- - - - - iff; t*?
* * * * * * * * * * * * r. * * * * * * * * * * * + + *,* * * * * * r * :i * + + * i * *
CONDITIONS OFAPPROVAL
Permit#: 800-0291 asofl0-18-2000 Status: ISSUED
***{t +******* +*:f * {r * {r ** * ** * f * * + + + * ** * * ***** * * * *** ** ** * *:r{.*rt!te*** ** ** * ** ** * ****** ** * * ***+ * **** ***** ** *** *{. {.*
Permit Type; ADD/ALT SFR BUILDPERMIT Applied: 1011712000
Applicant: PLATH CONSTRUCTION Issued: 10/18/2000
970-949-1905 To Exoire: 04/16/2001
Job Address: 2645 BALD MOLINTAIN RD VAIL
l.ocation: 2645 Bald Mountain Rd
ParcelNo: 210103401027
Description:
Install a nev/ ehake roof to replace the exisiti.ng sod roof
****:1.*dr********d!dfil**:******************:!{r********** COnditiOnS ++*{.********r.*******+************{t*******r*{t*
Cond: 12
FIELD INSPECTIONS ARE RXQUIRED TO C]IECK FOR CODE COMPLIAI{CE.
Cond: 1-6
sMoKE DETECTORS ARE REQUTRED rN Ar,L BEDROOMS AlirD EVERY
STORY AS PER S8C.31.0.6.1 OF TIIE 1997 I'BC.
,rdr***+**ir ***** **+ ************'** ** * ** *****+*{rir*****+ ** *'1.******:f *1.+*'1,1.* ***+:t4.{r {. ******* * *:1.{.** ++
TOWN OF VAIL, COLORADO Stareanert
*x********:f*+:t*'t**+****'t****r':t*tr*********{.**{.********************{.******'*******+****{r*******
Statement. Number: R000000080 Amoult: $598.95 L0/a8/20O0LA:25 All
Palment Method: Check Init: JllN
Notation: PLATII COI{STRUCAION
PermiE No: 800-0291 Tlpe: ADD/ALT SFR BUIIJD PERMIT
Parcel No: 2]0f0340L027
Site Address ; 2545 BALD I,IOUIIrAIN RD \fAIIr
r.'ocation: 2545 BaLd I'lountain Rd
Totar Fees: $s9g.95
ThiB Palment: $598.95 Total- ALIr Pmts: $598.95
Balance: 90.00
********+********+******{.*++*****f*+*****,t******,Nr***+*t +{.*f**********'l*****:t******t *:f:l******
ACCO{JNT ITEM LIST:
Account Code Descriotion Current Pmts
BP OO1OOOO31111OO BU]LDING PERMIT FEES
DR OO1OOOO31122OO DESIGN REVIEW FEEs
PF OOiOOOO31123OO PLAN CHECK FEES
tJC 00100003112800 t^iILL CALL INSPECTI0N FEE
343. 00
30. 00
222.95
3. 00
q
t'!
ApplrcArroN fr *ot BE AccEprED rF rNcoMpLE lh u
Building Permit
97O-479-2t49 (
Separate Permits are required for electrical, plumbing, mechanical. etc.!
75 S. Frontase Rd.Vail, ColoraEo 81657
Contad \e€essors Office at 97O-328-864O or visit for ParceI #Pard# ,At1/ - o34 nt raT
naName: -Stale!.4)Job Address: .. .db
Legal Description ll Lot: ll erock: ll riring:Subdivision:
OISAZ"U1T:'n shonnnt fid[effauxt. ffb,.x.Phone:
Architect/Designer:Address:Phone:
Engineer:Address:Phone:
Detailed description of work: (.,ltO*.t_Aj;
JU.l,t+), ,v,qhc,-}d;- ---
I
Work Class: New ( )Addition( ) Remodel ( )Repair( ) Demo( ) Otn"rgl
Work Type: Interior ( ) Exterior b<) Both ( )Does an EHU exist at this location: Yes ( ) No ( )
Type of Bldg.: single-family ( ) Two-famity ( ) Multi-famity ( ) commerciat ( ) Restaurant ( ) fther( )
No. of Existing Dwelling Units in this building:No. oF Accommodation Units in this buildino:
Noffvpe of Fireplaces Existina: Gas Appliances ( ) Gas Loqs ( ) Wood/pellet ( ) Wood Burninq (
No/Tvpeof FireplacesProposed: GasApjliances( ) GasLogs( ) Wood/Pellet( ) WoodBurninq(NOTALLOWED)
Does a Fire Alarm Exist: Yes ( ) No ( )Does a Fire Sprinkler System Exist: Yes ( ) No ( )
01
COMPLETE VALUATIONS FOR BUILDING PERMIT (Labor & Materials)
BUTLDTNG: $ d8 b37.ELECTRICAL: $OTHER: $
PLUMBING: $MECHANICAL: $TOTAL: S
REFUND CLEANUP DEPOSIT TO:
CONTRACTOR INFOR.MATION
Gengral Contractor:1MM Town of Vail Req, No.:
" tt/ u[1
Contact and Phone #'s:
?nrlt t -bu;etL ?'rq nA<
ContradorSign{Vre: ' - _, ,/ Zl_n)m-e,t -1
'trr****************tr********************FOR OFFICE USE ONLY**:r*rr*****************rr***^r**********
nECEIVEDocT i ? ?000
nDcHrvED
F :/everyoneforms/bldgperm
\to - Q)6 -3',1u3
Questions? Call the Building Team at 479-2325
Department of Community Development
Project Name:
Project Address:
This Checklist must fu comoleted fufore a Buildina Permit apolication is
acceoted.
All pages of application is complete
Has DRB approval obtained (if required) Provide a copy of approval form
Condominium Association letter of approval attached if project is a MultFFamily complex
Complete site plan submitted
Public Way Permit application included if applicable (refer to Public Works checklist)
Staging plan included (refer to Public Works checklist) No dumpster,parkino or material storaae
allowed on roadwavs and shoulders without written approval
Asbestos test and results submitted if demolition is occurring
Architect stamp and signature (All Commercial and Multi family)
Full floor plans including building sections and elevations(4 sets of plans for Multi-Family and
Commercial)
Window and door schedule
Full structural plans, including design criteria (ie.loads)
Structural Engineer stamp and signature on structural plans (All Commercial and Multi Family)
Soils Repoft must be submitted prior to footing inspection
Fire resistive assemblies specified and penetrations indicated
Smoke detectors shown on olans
Types and quantity of fireplaces shown
o
a
tr
D
a
D
D
tJ
!
fl
o
a
o
O
Applicant's
Date of submittal: elA
Received By:
I0lf"N 0I l':,llt
F:/weryone/forms/bldperm2
BUILDING PERMIT ISSUANCE TIME FRAME
If this permit requires a Town of Vail Fire Depaftment Approval, Engineer's (Public Works)
review and approval, a Planning Department review or Health Department review, and a review
by the Building Department, the estimated time for a total review will take as long as three (3)
weeks.
All commercial (large or small) and all multi-family permits will have to follow the above
mentioned maximum requirements. Residential and small projects should take a lesser amount
of time. However, if residential or smaller projects impact the various above mentioned
departments with regard to necessary review, these projects may also take three (3) weeks to
review and approve.
Every attempt will be made by this department to expedite this permit as soon as possible.
I, the undersigned, understand the plan check procedure and time frame, I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if i fail to do so it may affect future permits that I apply for.
Agreed
Signature
F :everyone/forms/bldperm3
WHEN A *PUBLIC WAY PERMIT'IS REQUIRED
PLEASE READ AND CHECK OFF EACH OF THE FOLLOWING QUEfiONs REGARDING THE NEED FOR A
"PUBLIC WAY PERMIT":
Is this a new residence?YES Noy'
D
D
a
D
tr
:"'tij}- "f the Risht-of-Way, easements or
No,/ -
YES No t/
,/Is a different access needed to the site other than the existing driveway? YES_ NO_l__
Is any drainage work paing done that affects the Right-of-Way, easements, or public property?YES- NO '/
a
tr
Is a "Revocable Right-of-Way Permit" required? YES No )/
Is the Right-of-Way, gasements or public property to be used for staging, parking or fencing?YES_ NO ll
If answer is NO, is a rydrking, staging or fencing. plan required by Public Works?YES_ NO y'
If you answered YES to any of these questions, a "Public Way Permit" must be obtained.
"Public Way Permit" applications may be obtained at the Public Work's office or at Community
Development (a sample is attached). If you have any questions please call Leonard Sandoval in Public
Work at 479-2L98.
ALL THE ABOVE QUESTIONS.
Does demolition work being performed
public property? YES
Is any utility work needed? YES
Is the driveway being repaved?
F :/everyone/forms/bldperm4
Company Name
PUBLIC WORKS AND THE PUBLIC WAY PERMIT PROCESS
IIow it relates to Building Permits:
Fill out the attached check list with the Building permit Apolication.
If yes was answered to any of the questions then a "Public Way" permit is required. You
can pick up an appiication at either Community Development, located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
Notice sign-offs for utility companies. ALL utilities must field verify (locate) respective
utilities prior to signing application. Some utility companies require up to 48 hours notice to
scheciule a locate.
A construction traffic control/staging plan must be prepared on a separate sheet of paper.
An approved site plan may also be used. This plan will show locations of all traffic control
devices (signs, cones, etc.) and the work zone, (area of construction, staging, etc.). This
plan will expire on November 1st and will need to be resubmitted for consideration for
approval through the winter, Be aware that your resubmission for winter may be denied
depending on the location of construction.
Sketch of work being performed must be submitted indicating dimensions (length, width
and depth of work). This may be drawn on the traffic control plan or a site plan for the job.
Submit completed application to the Public Workt office for review. If required, locates will
be scheduled for the Town of Vail electricians and irrigation crew. The locates take place in
the morning, but may require up to 48 hours to perform.
The Public Work's Construction Inspector will review the application and approve or deny
the permit. You will be contacted as to the status and any requirements that may be
needed. Most permits are released within 48 hours of being received, but please allow up
to one (1) week to process.
As soon as the permit is approved, the Building Department will be notified, allowing the
"Building Permit" to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit".
NOTE: The above process is for work in a public way ONLy. Public Way
Permits are valid only until November 15th. A new Public way permit is required
each year if work is not complete. Re-application each November 15th does not
mean an automatic renewal.
Signature
F : /everyoneforms/bldperm5
| .--- //u/ 1,
DateSigned
DRAINAGE AND CULVERT INSPECTIONS ARE REOUIRED BY PUBLIC WORKS!
Please read and check offeach of the items below:
u The Town of Vail Building Department has developed the following procedures to
ensure that new construction sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
o The Town of Vail Public Works Department will be required to inspect and approve
drainage adjacent to Town of Vail roads or streets and the installation of temporary
or permanent culverts at access points from the road or street onto the construction
site. Such approval must be obtained prior to any requests for inspection by the
Town of Vail Building Department for footings, temporary electrical or any other
inspection. Please call Leonard Sandoval at479-2798 to request an inspection from
the Public Works Deoartment. Allow a minimum of 24 hour notice.
o Also, the Town of Vail Public Works Depaftment will be approving all final drainage
and culvert installation with resulting road patching as necessary. Such approval
must be obtained prior to any Final Ceftificate of Occuoancv issuance.
Agreed to
Projectn;l*"tW
Datesisned: l0 //lo
Signature
F:/weryone/forms/bldperm 5
Please read and check off each of the items below.
(Copies of complete Gxt are availabte upon request)
CODE 5-2-rO: DEPOSITS ON PUBLIC WAYS PROHIBITED
o Unlawful deposits: Subject to subsection C thereof, it is unlawful for any person to litter, track or
deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt, snow, ice, or any
other debris or material upon any street, sidewalk, alley or public place, or any portion thereof.
o Notice; Abatement: The Director of Public Works may notify and require any person who violates or
causes another to violate the provision of subsection A hereof, or who has in the Director's employment
a person who violates or causes another to violate the same, top remove such sand, gravel, rocks, mud,
dirt, snow, ice or any other debris or material within twenty four (24) hours after receipt pf said notice
by the Director of Public Works. in the event the person so notified does not comply with the notice
within the period of time herein specified, the Director of Public Works, or other authorized agent, may
cause any such sand, gravel, rocks, mud, difi snow, ice, debris or any other material to be removm
from any street or alley at the expense of the notified.
u Summons and Penalty: As an alternative to the notice for removal provided in subsection B above,
any person who violates or causes another to violate the same, may be issued a summons to appear
before the Municipal Court of the Town for said violations, and upon being found guilty of a violation
hereunder be punished as provided in Section 14-1 of this code.
B Notice and Penalty: It is unlawful for any person to fail or refuse to comply with the notice of the
Director of Public Works as provided in subsection B hereof, and any such person shall, in addition to
payment of the expense of removal incurred by the Director of Public Works, as provided in subsection B
hereof, upon being found guilty of a violation hereunder, be punishable as provided in Section 1-4-1 of
this Code. (1997 Code: Ordinance 5 (1979).
CODES 7.3A-L AND 7-3A-3: PARKING OBSTRUCTING TRAFFIC & IMPOUNDMENT AUTHORIZED
u No person shall park any vehicle upon a street or at any other place within this Municipality in such a
manner or under such conditions as to interfere with the free movement of vehicular traffic or proper
street or highway maintenance. (Ord. 2(1968) g 1)
o Whenever any police officer finds a vehicle attended or unattended, standing upon any portion of a
street or upon any place within this Municipality in such a manner as to constitute a violation of any
section of this Article, or left unattended for a period of t\ renty four (24) hours or more and presumed to
be abandoned under the conditions prescribed by Colorado Revised Statutes section 424-1102, as
amended, the officer shall require the vehicle to be removed or cause it to be removed and placed in
storage in the nearest garage or other place of safety designated or maintained by this Municipality, and
the charges for towing and storage of such vehicle shall be'charged to the owner of the vehicle in
addition to a ten dollar ($10) impoundment charge. (Ord. 2(1968) g 3: Ord. 28(1981) 5 1)
I have read and will comply with the above code
Position or Relationship to Project:
Date Signed:
F :/everyone/forms,rb I dperm 7
,(r-0'
o
a!7
r7'-0'll'-6'
SPECIFICATIDNS CONTRACT NO,
Plath Construction, Inc.DRAVN BY NAIE
CHECKEI] tsY TiTLE
4645 ldta Montqin Rd.
DESIGNEI BY
SIZE FSCI1 N!DV6 NO. / FILE NAME
DESIGN ACTIViTY
CUSTOMER
scALE I'ATE1/8in : 1ft I to/t6/oo 1 of 1
o
o
Page2of 4
October 6.2000
Re-Roofing Specification for2645 Bald Mountain Road
I. TEAROFT/MrscELLANEous:
Locations: All pirched roofs on guest building.
Specification as Follows:
lJ Tear offexisting EPDNI I Tear off existine EPDM. insulation and flashines and remove all debris from the site. Anv ice and
water membrane o-n the rocif will be left in place b-ecause it is impossible to remove. Plath
Dpec rcalton as r(
lJ Tear off.existing
Water membrane oi the roof will be left in place bEcause it is impossible to remove. Plath
Consffuction will keep the iobsite as clean hs possible and practi'cal durins the construction, and a
thoroush cleanins of Plath's work areas will b'e performed irpon completidn. Plath Construction will
take allreasonable precautions to Drotect the int'erior of the buildins from water and weather.
However. Plati Cohstruction will hot be held liable for anv interior-damase sustained from leaksld liable for anv interior-damaee sustained from
that occur durifis the tear off pTrase of this work.
. rlam uonsrucuon wlll not De nelo laDle lor anv lnrcnor camage sustaln(
i sudden and/or unforseen stoms that occur duriie the tear off pTrase of th
l note lhat this tear offsection does not includehny tear offbr disposa
caused by sudden and/or unforseen storrns that occur duriie the tear off phas(** Pleasb note that this tear offsection does not includeinv tear offbr di
vegetation on the existins roof. **** Pleasb note that this te
vegetation on the existing
I of the md and
2l Inspect the plywood for water damage, and replace as needed.** This work, if required, will be an
ailditibnal chaie6 over and above the c6'nhact price. and will be charsed at the rate oT$ 2.50 per
qquare foot. Nb additional charges will be incirned without prior nofification of, and authon-zation
frbm, the owner or owner's agen-t.**'
3l Permits for this project are to be supplied by the General Conhactor.
Exclusions and Oualifications:
1l Added costs fo-r working urrder adverse winter conditions is excluded from the base bid. Please see
option #1 for pricine on this itrem.
2] Pricing for^this se-ction assumes that a 7 ton dump truck will have access to the base of the main2] Pricing forihis se-ction assumes that a 7 ton dump truck will have access to the base of the mait
resldence at tne sarase entrance.
3l.No fascia wor'k ha's been calculated in this proposal. Any necessary carpentry work is to be by
Price for Section I:$ 4,943.00
residencd
others.
4l The priqing dpe,q 4ot include the removal, storage and re-install of the glass or the removal and re-
fr-aminf of thE skylight opening.
IL LowERLAYERINSUIaTION:
Locations: All pitched roofs on guest building.
Specifications as Follows:ll Install 5/2" speclam insulation over the wood subsftate. The insulation board will be mechanically
attached to the ivood deck usins deck screws at the rate of 40 each per 4'x8' sheet of insulation board.
( Insulation boards will be mechanically attached, not glued, as reqriired by the manufacturer.)
Price for Section II:$ 4.920.00
Exclusions and Oualifications:
1l Added costs fo-r workins under adverse winter conditions is excluded from the base bid. Please see
obtion #l for pricins on this item.
J] The numbe'r of sclrews per board were upgraded from24 to 40 to account for the additional shear
Iactor.
ilI. Insuu,rrol:
Locations: All pitched roofs on guest building.
Soecilications as Follows:ll Install 4%" nailbase insulation over the soeclam insulation. The insulation board will be
niechanicallv attached to the insulation usin'e deck screws at the rate of40 ( not 24 ) each per 4'x8'
sheet ofi[sdlation board. ( Insulation boards will be mechanically attached, not glued. as requiredby
the manufacturer, )
Price for Section III:$ 6.894.00
a
Page 3 of 4
Exclusions and Qualifications:ll Added costs foi workins under adverse winter conditions is excluded from the base bid. Please see
oirtion #1 for pricing on this item.
IV. wArEnpnoorrNc - CLAss 'B' MEnruvr Cnoln Snaxns - CoppER FLASHING:
Locations: All pitched roofs on guest building..
Specifications as Follows:
1T Install "Jiffv Seal" Ice and Water Guard bv "Protecto Wrap" over 1007o of the pitched roof
nailbase insulition deck. The membrane will be installed up^the sides of the skylights. Use mastic as
needed.
2l Install #1. medium. Class 'B' cedar shakes with laced 18". # 30 felt each course. Use starter and
hip-and-ridge shingles as needed. The shakes will be installdd with a standard pattem and 10" reveal
to'the weatFer. -
3l Install l.6oz copper_flashings as needed, including valley, peak, step, and endwall flashing. Install
diip edge flashing'ht the roof"eave and rake edges. "
4l Install 16 oz copper flashing and waterproofing at the skylight areas.
Price for Section IV:$ 10.89s.00
Exclusions and Oualifications:ll Added costs foi workins under adverse winter conditions is excluded from the base bid. Please see
option #1 for pricing on this item.
V. EPDM - CoppBnrr,nsxnlc:
Locations: The flat section on guest building..
Specifications as Follows:l] lnstall- tapered insul4tion at the fl.at roof a&a. The insulation will be mechanically fastened with
approved sirews and plates as per the manufacturer.
2l Install a 60 mil adhered EPDM svstem bv 'Johns Manville' as per the manufacturer. The shake
rr5of system will overlap this systeni to ensrire watertight integrityl
3l Install 16oz copper flashings as needed at the roof eave edges.
4l Install 16 oz copper flashing and waterproofing at the slcylight areas.
Price for Section Y:$ 98s.00
Exclusions and Oualilications:ll Added costs foi workins under adverse winter conditions is excluded from the base bid. Please see
oftion #1 for pricing on this item.
VI. GeNnnq,L NorD,s:ll Please be advised that materials for this orooosal have been bid at current market prices. Due to
volatiliw of the market. material prices canhotbe suaranteed Dast 30 davs.* Please thke note that a
"letter bf intent" received bv Plath Construction. Inc. within the 3Odav period will allow us to
"lock in" current material $rices even if actual purchases are made seveial months later.
2l The #1 class 'B' cedar shakes for this Droposal have been bid at the crurent market price of
$-140.00 Der square. Due to the exheme^vofatilitv of the cedar market, Drice chanqes prior to the
acceptanc'e of this proposal will require renegotialion of the contract pribe, to refldct a'ny such
cnanses.
St pf]ft Constn-rction carries proDerw damase liabilitv insurance in the amount of $2,000,000.00 per
occurrence. Plath Construction iarri'es auto'insurancri in the amount of $2.ffi0.000.00. Plath
Qonstructiol caqles_appropriate Workman's CompeqsatioL insurange throqgtl Colorado rStals
Compensation. No fuither insurance coverage is included in our price, andif required, the additional
cost tvill be added to the contract price.
a
Page 4 of 4
4l Upon receiDt of the conract Drice. Plath Construction will issue a warrantv certificate zuaranteeins
niofing asaindt leaks due to flarls in workmanship for a period of, one year fiom the datebf roofinq -
complEtid'n. Leaks qualifying under the terms of taid wdnanty witl beiepaired promptly at no coslto
the tjwner. This wartanty doEs not cover any subsequent intefior damage'that may octui.
5l {l pricing in this proposal includes the costs associated with dumpsters for the removal of the
roonnq rasn.
Vil. Orrror.s:
Option #1 $_dditional c_ha{ges, as identified below, will apply for roof work done between Oct.- 15 and Aoril 30I
Ice and snow removal. dailv coverins and uncoverine of the roof deck with plastic,
and drying out of the roof deck, if netessary, will beln e4fi-a-c-h^arge over anA above. if netessarv. will beln extra charse over and
iareed exffa'dt the rate of $ 34.00 p?r man hou
) w-ill be charsed exffa at Plath's cbst.
tie conra-ct price and will be chzreed exra at the rate of $ 34.00 p-er man hour.
Materials (plastic. propane, erc.) w-ill be charged extra at Plath's cbst.
b. Primins may be reouired for Jiffu Seal. dependins on sile conditions and outside
temperbturei durine application." If orimirie is reo=uired. this work will be charsed
extrh at the rate of$ 21.50 per 100 iquareTeet. Total price not to exceed $ 4t2.00.
c. Winter conditions have a nesative effect on our production rates. Durins winter
months. additional charees-will aDDlv to cover our added expenses for-working
under adverse winter conilitions. Thb 6ffect of adverse winterbonditions resultsln a
loss of dailv production of aoproximatelv 257o. (This is an averase production loss
rate based 5ri vears of iob colsHne data.)'Any such charqes will nbt 6xceed the
amounts listed below dnd are in Idditicin to 6ny snow reYnoval and priming charges
that mav apply.
Section I ^' - Add to the base bid $ 824.00
Section II Add to the base bid $ 259.00
Section III Add to the base bid $ 310.00
Section [V Add to the base bid S 1.177.00
Section V Add to the base bid $ 56.00
Option 2 Add to the base bid $ 123.00
Option #2: Install a layer of #30 felt below the superinsulated roof.
Price for Option #2: - Add to the base bid $ 729.00
Option #3: Substitute galvanized flashings for the copper flashings. All other specifications to
remaln tne same-
Deduct for Option #3: Deduct from the base bid $ 497.00
Optio_n #4: Install walkway pads, as snow removal protection, over the EPDM as per manufacturer's
sDeclncauons.
Price for Option #4: Add to the base bid $ 484.00
o 0,-o'
ar
4'-d'
It
l_:
SPECIFICATIDNS CONTRACT N[.
Plath Construction, inc.DRAVN BY DATE
CHECKEI] BY TITLE
a6as lq(h {odtoh Rd.
DESI6NED BY
SIZE FSCL ND. IDUG Nn ./ FI-i NAMI
DESIGN ACTIVITY
CUSTDHER scAle IDATE1,z8in = lft | $,/t6/@ 1of1
o
o
04-4t2001 Inspectlon Request Reportlng Page2
7:53 am _ __ ' vAtL_Co -'TowI{ bF -
Reguested Inspect Date: Itonday, Aprll 30,2001' Aslloned To: CDAMS
hsp€ctiSnType: BLDG
Insirecdon Alba: CD
SIE Address: 2645 BALD TCOUNTAIN RD VAIL
2645 Bald Mountaln Rd
AJF,D Intormrton
Ac[v,ilY BfrFt]2g{ TvDe: A-zulLDCm{Ty$: occupo-ncle
Peical: 2to1o34010r27
OUna]: SI-IAPER, STEPTIEN & sUE Z. -JT
Contractor: PLATH CO$ISTRUCTION
Apdlcani: PLATH CONSTRIJCTIo}I
De$citfilofil lDsla[ I nely sh€k6 root lo ropl€cs the stdslung sod ,oof
R€ouesbd lnspccf,on(sl
lbfi: ff) BLDG#inal
Requeclor: PLATH CONSTRUCTION
Cofimonb: AhIYTIME NOOIIE ON SITEA*hffi; cDAvrs
Inspec{on Hlsbrv
3O BLDGFramlm
70 BLDGMtsc. -
90 BLDG-Ftnal
SubTlD€: ASFR
Us€: V N
Phone: 970'9491515
Phone: 9?tF94919(F
Requested Time: 08:00 Afl
Phone: 97(}9{$ 19(F
Enlercd By: JlrCtrffRAGON
Stahs:
lnsp Ar€o:
ISSI.JED
CD
Time Exp:
frem:
lbfii:
lbm:
(Optloftal)
(oDdon€I)
tR6rtuircd)
\Xqf't{t
REPT131 Run Id: 580
^-t'di,
r{
Raa|$stqd lnsFcatD.b:' Alihned Tol
lruoccilbo fyDO:InsiffilonAib.!SlbArklrrs:
totray, Apfll 30. 20ol
cDAVIS
EI..DGco
2645EIilJ ffiJiIT,JNR[}VTLt*l6 B*ld ilo(|nhln Rd
AF|Olaformctbn
ngryqt$t0sooetftu(cl
hEflr: S ELDG.Fl$slR.crmr: PLATH COIII9TRIICTIONcotrinc: AlrIYTttr t$ooftEoNstTFArdgrldTo: CDAVIS- Adofi:11ne Erp:
lfisp.|3[sr ]{l$ory
[.dt 30 BtDf'.Fromlnohfi: 7U BLDGtlbc. -
lbm: 9l Bt0f,'Fk$l
A.iltftcolrSTtpl:ffid:
Ormd:Corfr$r:
AFDlcilt
Duicrtillm:
SI.6Turg: ASFRtjts: V N
Phonc 97tl.Or&1905Plpm: 97tr94&190t
R€quccilcrl TFxe: oEfl! Af' PtrofE: S70-8{+tS
Efihedry .rilOf.lDRAffi.t l(
SIc:lmAlu:FSTJED ..
CD
..ir, .
h!tr$ I new stste rodb refle6lh st lsi0ne 3od ruf
iopoond){ffi.rf,0'
tRftuftd)
{i
F
\hq
/ ,P
"'{Dlo'Y' 1{\ -,,-
RSFT131
rrl\
{nl
,,
Run Id^: 580
TOI{N OF VAII,
75 S. FROI*TAGE ROADVAIL, CO 8L657
970-479-2L38
APPLICANT
CONTRACTOR
OWNER
899-0130
Status--.: ISSIJBDApp1ied..: Os/24/L999Issued...: 06/02/1999
E:qrires . .: LL/29/L999
co
co
8J.532 81532
81632 8L632
Phone: 970-926-3443
Phone: 97Q-926-3443
5251 WESTIIEII'IIER,IrousToN, rx 77056
Occupancy: R3/M.rtpe Construction: V 1-HR
Type Occupancy:
Not, in Eable!
TlDe V l-Hour
ValuaEion:
firaplece Inf,orort.ion: R6st.r.ictsad: Y
286, 000
{*of OiE Applianc.s:
FBts An!,IllRY
Bullding----->
Plan ch.ck--->
lnve6EigrCion>
will call---->
1, {84 . 00
96{.50
.00
3.OO
.00
200.00
.oo
500 . o0
3,151.50
3,151.60
.00
3 , 15tr .50
.00
ReEtuarang Plan Revi6rr-->
DRB F6e--------
Recreation Fee---------->
Cl€.n-attr DcpoEit- -- - - - - - >
TOTLE FBBS- -- --
BUIIDING DEPARIIIEMT
'JRM Acgion: NOTECIIARLIE AcIion: APPR
PI-,JINNING DEPARTI{EIiIT.JRM AcTJ-on: NOTEAOCHS Act.ion: APPRFIRE DEPARI?IENTiIRM Act,ion: APPRPT'BLIC WORKS..fRM Action: APPR
Total Calculatscd Feea-- - >
Additional Fqas--------->
aolaL Peraits Pee-------->
Pa)menea-------
B.AIIANCE DUE.. -.
t t rt *.**rr a*rrrr
It,em: 0510005/24/L999
o6-/ oL'/L999Item: 0540005/24/L999o5'/2s'/L9e9IEem: 0550005/24/L999Item: 05500
os /24 /L999
DepE: BUIITDING Division:
ROIITED TO CIIARLIESee condiEionsDept.: PLANNING Division:
PI,ANNER
Dept: FIRE Division:
Dept,: PUB WORK Division:
ROIITED TO
N/A
N/A
*.tarrir*rrriit
gee Page 2 of Ehis Documents for any condiE.ions EhaE may apply to this permit..
I hrreby acknor.lcdgr that I have rrad lhis .pplication, fllled out i.n f,ull the infor6aElon rrquirod, co[plec.d an rcsuraue ploc
Pl.n, .rrd st.Lc thrl all Chc lnforhabion provided aE requlr.d ir corracc. I agrca to couply vich €hc infordebion and ploC plEn,
Co cdlrl)r tigh all Tolrl oldinenc€s and st-t'. 1rrs. |nd to build Lhio acruccure eccording to Ehc Tof,n, E zoning aod dubdlvLsion
cod.s, daaiEin rcwicv approvcd. t nifoar Building codc and oth€r ordittatrc6s of ghc lo|'n aElrli.cable tsher€Co.
REQITESTS FOn llISPaelIOlJIt SHALL BB l|lDE TWE!a!C-POW goDn,s IN ADVAI{CB BY TELBPHOIIB AT 479-2138 OR AT OUR OI!IeB FRolil a:oo A}l 5:00 Pu
t o ,(f,fL"ffi
DEPARI1IEIiIT OF COMMUNITY DEVELOPMENT T
NOIE: TIIIS PERMIT MUST BE POSTED ON iIOBSTTE AT AIJt TIMES
ADD/AI,T MF BUILD PERMIT,PETTTiI #:
ilob Address: 2645 BAIrD MOIII{1fAIN RDLocation. . .: 2645 BAID lrftN RD
Parcel No.. r 2101--034-01"-027Project No. : PRiI99-0031
COEEN CONSIRUETION
P O BOX 1889, EDI{ARDS
COHEN CONSTRUCTION
P O BOX 1889, EDWARDS
SHAPER STEVE TOV/Comm. Dev.' Clean-up DeDescription:
BUTI,D GARAGB WIrH TIVING SPACE ABOVE (PSMODEL) APPTOVEd ]
it Refund
amount
date
Add Sq Ft:
fof caa Logd:*of wood/Pall.t, r
gend Cloaa-Itir D.!ro6it ?o: COHEN 0'NST
*****************************:t*:r*********:l:l********************!r****************
CONDITIONS
Permit, #: 899-0130 as of 06/02/99 status: ISSIIED
*:l*******************************************!t*************:t********************
Permit Tlpe: ADD/ALT MF BUILD PERMIT Applied: 05/24/L999Applicant: CoI{EN CONSTRUCTTON rssued: O6/o2/L999970-925-3443 To E:<pirez LL/29/L999
ilob Address:
Locatsion: 2545 BAJ,D lvmil RD
Parcel No: 2101-034-01-027
Description:
BUII,D GARAGE WITI{ LIVING SPACE ABOVE (REMODEI)
Condit.ions:1. FIELD INSPEETIONS ARE REQUIRED TO CIIECK FOR CODE COMPLIAIiICE.2. SMOKE DETECfORS ARE REQUIRED IN ALL BEDROOMS AND EVERY STORY
AS PER S8C.310.6.1 OF THE 1997 ITBC.3- Tttis project. has been granted a variance. A foundation ILCie required wit,hin 3 weeks of forrndation completion4. Make note of corrections redlined on plans
5. No work or materials allowed within Ehe R.O.W. unbilproper permits and approved staging plan is submiE.ted
sreNAroe' "!a- oR conrRAcroR FoR Hrll"ar,F AND or,ncER
trrtattrrtr.taatrr!rttif *.r!rrt.trtartrt''r.rlt*trr1.rf .t.rr.*r'f tr
lgig fl Vr8., CO[€Afm Errr.BE
tt.rrrliaaa,rililtl,ttrft!trtttatFlltatralti!rtatal.'lartaa*rir,raraa*trrrt
Strt*rt It$.E: &EC-0i25 tDnnt:3,r51.50 o6lo2l9t Lzrs,
. :::1:Y:-:-----:::::::.T::l:1T-:---:i::.::--
?.drl,t ltst Btg-OliO tltr.: l-lfr IDD/AIIr F Et'ItD 9!B
P.rctl b3 21O1-O3a-O1-02?
gi!! ldda.t.: 2615 !lI,D r|olntTAlr lD
' !oc.ci.qr: tLaB llll Flt ID
Itrl' EqrurB
Brlrnoa:
3,151.50
3,151.50
.oo
IDTBts
t.ra{.00
200.00
t5a.60
600,00
3.00
lotrl fcca:
l,151.60 trot l l&L Potr:
tttaaatftatraatttt,arattoa/attt*arttaaaaratf ttti..iatal*rr'}ttiaatrri}
lccoultt Ooda D.rcripti.o. n
!P t0100003111100 EttItDIIrc Pt IT FBEtt
m 0010000t112200 Dlatc nEvlat| tE$r
tt co1000031l.1roo Pr|ltt cBrcr( Fllt
rD ir2-D@08 CLIN|UP DIP T3
ic oo10000it112300 II'JL cal& tlSDteltot ElE
PREPIRED 2122loo, 11:21:06
PROGRAII IIR{1sU
ToBn of vait
DEPOSIT REFUTID REPORT-I'PDAE PI6E 1
ct ST-ID cn{l$o{ER llAfE
cl|lncEcoDE DASCRIPTION
DIPOSII DEPOSIT-AN' IDi'I'I'II'E!IT TFIBR-RE?TTD
Ir-DtrE trt-DtT! .aDrorrlT r|aoulrr AnouuT AlDlllr
190? 899-0130 ooI|EN CONSIRItCIION D2
DEpOs DEpOSrr 6/03/99 2/22lOO 500.00 500.00 5O0.OO-.00
SOCA'J FOR CUSTO*IER rrPE! D2
G/L BATCII CREATED: BATCII-o0466 2o0ol02 USERID-aIPOPECtr lP HEIrD @ttrEl-
500. o0 500.00 500. oo-.00
CIRAND TIOII!: 5oo.oo 50O.0O 5oo.Oo-
DEPOAIT COIrltT! 1
1.00 N{oMT-500.o0
o
PE5qq" 063 t
TowN oF vArOoNsrRUcloN pERMtr TION FORM'
INI'ORMATION MUST BE COMPLETE OR THE APPLICATION WILL BE REIECTEI'
Contact the Eagle CouW Assesso/s Office at 97&328-E640 for parcel #
Parcel# 2"lO1O?40 1O)j _
Date:5/'19/99
JobName: Shaper Remodel JobMdress: 2645 Bald Mtn. Rd.
Building (x)Plumbing ( )Electrical ( )Mechanical ( )Other ( )
Legal Description: Lot 1 0 Block 2 Filine 1 3 Subdivision Vail Village
Onners Name: Steve Shaper Address: 5 2 51 Westheimer, Horrston , Tfhone#__L-3=::l_=-Zj_L1
7 7 056-5404
Architect: Resort nesi gn Cn'l I ah. Address: 1 O0O s _ nrnntage Rd Phone#9j4:41g:44j3
Description ofJob: Constrrrct ga ragc with I .i v.i ng qFar-a above grararJa
Work Class: New ( )Altcration ( )Addirional Q )Repair ( )Other( )
Number of Dwelling Units: 1 Number of Accommodation Units: 1
Number and Type of Fireplaces: Gas Appliances n/a Gas Logs_ nla_ WoodlPellet n,/a
n."",t* Bffl- O/Jo
VALUATIONS
BUILDING: $ 23q.000 ELECTRICAL: $ re -oooPLIIMBING$ 11,0n0 MECHAMCAL$:0,0nn
CONTRACTOR INFORMATION
4qq',QLJa ^ ^G€nerNl Coniractor- Cohen ConstrUCtion I Ad(tress: y.u. rox 1889
Phone# 970-926-3443
Electrical Contractor. Doub le Diamond Servic,Qddress: P.o. Box 1452 , Edwards . CO 81632
Town of Vail Registration No. 21 5 -E Phone #
Prumbins conrracror' "ot-ffi*
970-926-620.?.
Town of Vail Registration No . 1 29 -P Phone #Gs.fMechanicalContractor. Colorado Plumbing -Address:
Town of Vail Registration No. 1 1 7 -M rnon.u ="" .oo'" ^ate lece-iltn
FOR OFFICE USE nAY 2 i 19gg
BUILDING:
SIGNATURE:
ZONING:
SIGNATURE:
Town of Vail Regiffation No, 1 2l-B - Phonrce123-B
OTHER: $
TOTAL S zSk,OOO -
Edwards co 81 532
2335 Fl- 7th St-S, Rifle. CO R1650
97 0 -625-07 66
see above
CLEAN UP DEPOSIT REFUND TO:
TO:
FROM:
DATE:
SI.]BJECT:
a o
ALL CONTRACTORS CURRENTLY REGISTERED WTffI THE TOWN OF VAIL
TOWN OF VAIL PI]BLIC WORKS AND COMMIJNITYDEVELOPEMENT
JANUARY I, I999
CONSTRUCTION PARKING AND MATERIAL STORAGE
CODE 5-2-10: DEPOSITS ON PUBLIC WAYS PROHIBITEI)
A. Unlawful deposits: Subject to subsection C thereof, it is unlawfirl for any person to liter,
track or deposit, or cause to be littered, tracked or deposited, sand, gravel, rocks, mud, dirt.
snow, ice, or any other debris or material upon:ury stree! sidewalk, alley or public place, or
any portion thereof.
B. Notice; Abaternent: The Director of Public Works may notifu and require any person who
violates or causes another to violate the provision of subsection A hereof, or who has in the
Director's employment a person who violates or causes another to violate the sane, top
remove such san{ gravel, rocks, mud, dirt, snow, ice or any other debris or material within
twenty four (24) hours after receipt of said notice by the Director of Public Works. In the
event the person so notified does not comply with thc notice within the period of time herein
specified, the Director of Public Works, or other authorized agent, nury qruse any such sand,
gravel, rocks, mud, dirt, snow, ice, debris or any other material to be removed from any street
or alley at the expense of the notrfied.
C. Exceptions: The provisions ofsubsection A hereofshall not be applicable:
l. Within the immediate area of auy construction, maintenance or repair project of any
sheet or alley or of any water main, sewer main, electricity line, gas line, telephone line
or any appurtenance thereto;
2. To deposits of sand, dirt or materials necessary for the protection of the public safety; and
3 . To public areas designat€d for the dumping or depositing of said materials.
D. Summons; Penalty: As an alternative to the notice for removal provided in subsection B
above, any
person who violates or causes another to violate the sam€, may be issued a summons to
appear before the Municipal Court of the Town for said violations, and upon being found
guilty of a violation herzunder be punished as provided in Section l-4-1 of this code.
E. Notice; Penalty: It is unlawful for any person to fail or refuse to comply with tle notice of
the
Director of Public Worlcs as prwided in subsection B hereof, and any such person shall, in
addition to payment of the expense of removal incurred by the Director of Public Works, as
provided in subsection B hereof, upon being found guilty ofa violation hereunder, be
punishable as provided in Section 1-4-1 ofthis Code. (1997 Code: Ordinance 5 (1979)
Read and acknowledged by:
Position or Relationship to Project:
(i.e. contractor or owner)
o^n' {f ,q fqq
o
TOWN OF VAIL
Department of Comrnunity Development
75 South Frontage Road
Vail, Colorado 81657
970-479-2138
FAX 970-479-2452
Agreed to by:
Project Name:
BUILIIING PERMIT ISSUAI{CE TIME I'RAME
If this permit requires a Town of Vail Fire Department Approval" Engineer's (Public Works)
review and approval, a Planning Depaxhnert review ofHealth Deparhnent review, and a review
by the Building Department, the estimated time for a total review may take as long as three (3)
weeks.
All commercial (large or small) and all multi-family permits wiil have to follow the above
mentioned maximum requirements. Rcsidential and small proj€cts should take a lesser amount of
time. However, if residential or smaller projscts impact the various above mentioned
departments rvith regard to necessary rwiew, these projects may also take the three (3) week
period.
Every attempt will be made by this deparnnent to expedite this permit as soon as possible.
I, the undersigned, understand the Plan Check procedure and time frame. I also understand that if
the permit is not picked up by the expiration date, that I must still pay the Plan Check Fee and
that if I fail to do so it may affect firture permits that I apply for.
SvlWr*t- (l;g'qoog-
Date: {/,rltt
*o O.O,.
{g*o"* "o
TO:
FROM:
DATE:
RE:
o
MEMORANDUM
ALL CONTRACTORS
TOWN OF VAIL PIJBLIC WORKS
JANUARY I, 1999
WHEN A ?UBLIC WAY PERMIT: IS REQI]IRED
Is this a new residence? YES NOx
Is demolition work being performed tbat requires the use of the Right+f-Way, easements orpublicpropeny? YES NOx
Is any utility work needed? YES x NO
Is the driveway being repaved?YES X
Is a different access needed to the site other than the e.tstinq drivewav? YES x NO
Is any drainage work being done that affects the Right-of-Way, easerrents, or public property?
YES x NO
NOx
JOBNAME: Shaper Remodel
DATE: 5/ I q,/q q
PLEASE ANSWER THE FOLLOWING QUESTIONNAIRE REGARDING TIIE NEED FOR A.?UELIC WAYPERMIT':
l.
7
J.
4.
5.
6.
NO
't.
8.
Is a *Revocable Right-of-Way Permit" requfued? YES
A. Is the Right-of-Way, easernents or public property to be used for staging, parking or fencing?
YES X NO-
B. If NO to 84, is a parkin& staging or fencing plan required by Commrurity Development?YES NO X
If you answered YES to any of these questions, a "Public Way Permif' must be obtained-
"Public Way Pennit'' applications may be obtained at dre Public Work's ofrce or at Community
Dwelopment. If you have any questions please call Leonard Sandoval from Public Works at 479-2198.
I HAVE READ AND ANSWERED ALL TIIE ABOVE QUESTIONS.
Cohen Construction, rnc.
ComoanvName
o
PUBLIC WORKS PERMIT PROCESS
How it relates to Buildine Permits
Fill out our check list provided with a Building Permit Application.
If yes was answered to any of the questions then a "Public Way'' is required. You
can pick up an application at either Community Development, located at 75 South
Frontage Road or Public Works, located at 1309 Vail Valley Drive.
Notice sign offs for utility companies. All utilities must field verify (locate)
respective utilities prior to signing application. Some utility companies require up
to 48 hours notice to schedule a locate.
A construction traffic controUstaging plan must be prepared on a separate sheet of
paper. An approved site plan may also be used. This plan will show locations of
all traffic control devices (signs, cones, etc.) and tlre work zone, (area of
Constructioq Staging, etc,). This plan will expire on November lst and will need
to be resubmitted for approval through the winter.
Sketch ofwork being performed must be submitted indicating dimensions (lengtt\
width and depth of work). This may be drawn on the traffic control plan or a site
plan for the job.
Submit completed application to the Public Work's office for review. If required,
locates will be scheduled for the Town of Vail Electricians and Irrigation crew.
The locates take place in the moming, but may require up to 48 hours to perform.
The Public Work's Construction Inspector will review the application and
approve or disapprove the permit. You will be contacted as to the status and any
requirements that may be needed. Most permits are released within 48 hours of
being received, but please allow up to one (1) week to process.
As soon as the permit is processed, a copy will be faxed to Community
Development allowing the "Building Permit" to be released. Please do not
confuse the "Public Way Permit" with a "Building Permit" which is to do work
on a project itself.
NOTE:
The above process is for work in a public way ONLY.
Public Way Permits are valid only until November l5e.
A new Fublic Way Permit is required each year if work is not complete.
e,
l.
)
4.
5.
6.
n
o
DEVELOTOIIN. OF VAIIJ
75 S. FRONTAGE ROADVAIL, CO 8L657
970-479-2L38
El€ct'r.ical- -- >
DRB Fea
lnvrECigation>
will call---->
TOIAI, FEES-- - >
DEPARIT4EMT OF COMMI]NITY
co 81532
co 8r-632
PMENT
ON .]OBSITE AT ALL TIMES
Permit E99 - 0082
status...: ISSIIED
Applied. .. 05/24/L999Issued...: 06/04/L999
Expires . .: L2/oL/L999
Phone:. 9'70-926-62O2
Phone:. 97O-925-62O2
ValuaEion:16, 000. 00
NOTE: THIS PERMIT MUST BE POSTED
EI,EETRTEAL PERMIT
iIOb AddTCSS: 2545 BALD MOI]NTAIN RD
Location. ..: 2545 BALD MTN RDParcel No. -: 2101-034-01-027
ProjecE, No. : PRiI99-0031
APPLICANT DOIIBLE DIAIIOIID SERVICESP. O. BO)K L452, EDV{ARDS,
COTiITRACI1CR DOT'BLE DIAIIOND SERVICESP. O. BOX t452, EDWARDS,OWNER SIIAPER STEVE
5251 WESTHETMER, IIOUSTON, TX 77056
Descript,ion: ELESRICAIJ FOR ADDIT]ON
FBE SUTI|ARY *aar*a{r*t.*.r.
289.00
,00
3 .00
291 . oo
Tolal ealculaLed Pe€E--->
ToeaL P6rnit Fee-------->
PayuenCs-------
BAIAITCE DUB--._
Addifional F.as---------> .0o
29L .00
291.00
.oo
?91. OO
rrtrr*r**r**ttr*rtartr*rrrrf ****t+**alrt*rri
IIEM: O5OOO BLEETR]CAIJ DEPARIII'IENTO6/OL/T999 CHARI,IE .A,cLion: APPR CHARLIEITCM: 05600 FIRE DEPARTTiIENTO6/U./L999 CIIARL,IE AcEion: APPR N/A
DA?iE.: BUILDING Division:
Dept: FIRE Division:
CONDITION
1. FIEI,D TNSPE TIONS ARE REOUIRED TO
OF APPROVAL
CHECK FOR CODE EOMPLIANCE.
trr+rrrrr*rrti+
DECI,ARATTONS
I heteby acknorlcdga that. I have read uhid applj.cat.ion, filled ouf in full Lhc infonnacion required, conpletod an accurate plot
plan, and slate tha! all th€ infonnatsion provided as requircd i6 correc!. I aglee Eg conply with the inforEalion end plots plan,
to cotqtly Yith all Towt! ordl.Dances and state lars, and to build lhis €tructure according uo the Toih's zoning and gubdj.vision
codss, deEign review approved. Uniforan Suilding coda and other ordinanceE of tshe foirn applicable theretso.
REeoEsrs ron :irsprcrrous slrALrJ BE I,tnDE TgENTT-FotrR HouRs rN eDvAncE By rErJEpHor{E AT 479-213g oR AT ouR oFFrcE FRoM a:oo AM 5:oo pu
TOri[ oF \ralti, @r,oRtDo SEatsErE
gEaEcunE nr.rlbar: REC-O529 ltlount:
Pa!'[.nl l,l.chod: C|I( Notatioor 9955
29t,OO 06/04/99 09 tS2
Inil: .n{
PorDlE No: E99-00S2 :t\/pe: B-8LtsC ELtsCTR.ICAj pERJ.ttT
P--ccl lfor 2lO1 -O34-O1-O27
Sit'E Addroae: 2645 BtlD HOU|aAIN RD
Loqatsiorl: 2645 BII.D !lT!l RI)
Total tcGa:
ttria Prlturnl 291.00 Total ;tr,L PE!r,
Brlrncc.
291.00
291. O0
.00
AnounC
2Aa, OO
3. O0
rr{ rfi rrrtttt tttii itt ttt t * t 'ri ** r!r 'r ti ttl rrtttt t !t r i i!rrr +}*lr .r *t +ttt r, i *
AccounE coda De6cripcion
EP OO1OOOO31114OO ELAETRICAII PERUIT PBES
xrc ootoooo3r.l2aoo rILL CAI;IJ rNgPEcIroN FEE
TOWN OF VAIL
75 S. FRONIAGE ROADVAIL, CO 81557
970-479-2]-38
APPI.IIEANT
CONTRACTOR
OWNER
DEPARII'{EI{T OF
o
COMMUNITY DEVETOPMENT
o
NOTE: TIIIS PERMIT MUST BE POSTED ON
PLT]MBING PERMIT
iTOb AddrEAS: 2645 BALD MOUT.ITATN RDLocation. . . z 2645 bald mt. rd.Parcel No. . : 21_01_-034-01,-027Project No. : PRJ99-0031
COIJORADO PIJTJMBING SERVICE2335 ATRPORT ROAD, RIFLE CO 81.650
EOI,ORADO PLIJMBTNG SERVICE
2335 AIRPORT ROAD, RIFIJE CO 81650
SHAPER STEVE
5251 WESTHEIMER, IIOUSTON,TX 77056
Status...: ISSI]BDApplied..: 06/30/L999Issued... r 06/30/]-999
Erqgires - . : L2/27 /L999
Phonez 970-625-0764
Phone: 970-625-0764
JOBSITE AT
Permit, #:
ALL TIMES
P99 - 0063
Description: pliutdblng for remodel/addiE,ion Valuat,ion:7, 000.00
r*'r**trtrt*.rr**r+rr****i{*iir**r**}*a+*rirt* FEE gU$UARy *rrr,rrrrr.*r***
FluDbing- - - - ->
Pll't chcck-- ->
hvcatiEetion>
l{ill call---->
RaaEuarant Plan Revicrr-- >
mTAI, aB!s- -- - -
Total Caleulaeed Fcaa- - ->
AdditLdr.l Fcea--------->
Total Perlllt Fec-------->
105 . OO
26 -25
.00
3 .00
.oo
1-34.25
134.25
t-l1 .28
r*i*a*r**r***+r*'r'*ra****r'*, *****a****r,,,r, """-""--".fH::.:T;;;;;;;;;;;;:-.---,.,",.,;11,,-
IEe.qt .05100 BUTLDTNG DEpARTMEriflr Depr: BUILDING Division:9F/3o/1999 CHARLIE Act,ion: AppR charlie davi-eIqetri,g5qQo_EIBE DEPARTI{EMr Depr: FrRE Division:o5/3O/L999 CIIARI-,IE Action: AppR n/a
*i *r rrt rr. rrrlrt
CONDITION OF APPROVA]-,
1. FIELD INSPECfIONS ARE RBQUIRED TO CHECK FOR CODE COMPI_,IAI\ICE.
*tat*****r*r*********tt*rit,rrr ***i*it*****rr**
DECLAR.A:TIONS
I hc!.b!t acknovl.dgc tshrt I ltave rcrd tshi6 applicauion, fill,.d oue ln full th6 inforuatl,on tequircd, coDlrlcbcd en .ccuraho plot
Pl.n, |nd sbate thrt alL th. informarion providad es required le correcE. I igree tsg eo't[trly rJich the inforracion anat plot plrn,to coEtrtly ritsh all Totlt ordLnaricas aDd sLat.c 1aw5, and Co bulld Eh:[r alruccur. accordtng tso thc To{n, B zoninE a.nd 6uHi\ri6ioncod.t, dcsigtl rcwicr tErprovcd, uniforrn Bullding codG .nd or.h.r oldinar|ccF of tha Totrn ap!r11c6ble bhor6bo.
REQUE€$g FoR rNsPEeItoNs SHAIJL Bg MIDE THEMIY-FOI'R souRs rN A$rANcE By TELEPHoN? er nzg-zise oR yl/DUR-oFFIcE FROM s:oo Al.i s:oo pul'*, /U' JLI', '
'--l ./
Itt-
************************l************!b***********t**********tf ***
TOI{N OF \IAII,, COI,ORADO statemnt* * * * * * * * :* * * * * * * * * * + * * * * * il rt * * !t !t * * * !t * * * * * * * * * * * * * * * * * * !t * * * * !t * tt :t * * *
SEatemnt, Nurnber: REC-OS3S .Arflorrnt,: 134.25 05/30/99 08:48Palment MeEhod: CI{ECK Notation: #30050? IniE: CD
Pennit, No: P99-0063 Tyge: B-pL[,tB pL,tMBIt{e PERMITParcel No: 2101-034-01-027
S1IE AddrEBE: 2645 BALD MOT'IfTAIN RDLocationz 2648 bald mt. rd.
This Paymene
ToEal Feea:134.25 Total ALrLr Pmts:
L34.25
L34.25galance: .00***********'****************.******+*************************!r**!t*
Amount
105.00
26.2s
3 .00
Account Code Descript,ion
PP OO1OOOO31].1200 PIJIII,IBING PBRMIT FBESPF OO1OOOO31123OO PIJATiI CTIECK FBESwc 00100003112800 wrLL ca,LL INSpEefION FEE
TowN oF vArloNSTRUcroN pERMff Ail.rcATroN FoRM
INFORMATION MUST BE COMPLETE OR TffE APPLICATION WILL BE REJECTEII
Contadtlye Eagle CounU Assessors QfficE d 970-328-8640 for parcet #
Parcet# 2tol- O3q - 6t - W7
piarc: L'3o -cl1
Iob Name:Job Address:
Building ( )Plumbing(X)Elecrical ( )Mechanical ( )
Legal Description: Lotllo_ Blwk_Z_ Filing Subdivision Votv Ut*iloa
ornrctsNaarc:,Enrc I ,fas.^ J'tehe Address:
iuaaE
m*""f!9-Lj-t:_Zez
Description of Job:
L&iNf P6.d
772t D
Work Class: New ( )Alteration ( )
Number of Dwelling Units: I
Number and Tlpe of Fireplaces: Gas Appliances
Additional (X Repair ( ) Other ( )
Number of Accommodation Units:
Gas Logs Wood/Pellet
VALUATIONS
ELECTRICAL: $OTIIER: $BUILDING:
PLTJMBING S_J-m_=__MECHAMCAL $TOTAL $
CONTRACTOR INFORMATION
General Contractor:
Town of Vail Registration No.
Address:
Phone #
Electrical Contractor:
Town of Vail Registration No.
PtumbinsContractor Croeao,t: Ptuo,Aua Sndrur"t ?fi. ooLe
Town of Vail Regisuation No. ,Jq - P Phone #
Mechanical Contractor:
Address:
Phone #
Town of Vail Regisfarion No.
Address:
Phone #
FOR OFFICE USE
BUILDING:
SIGNATURE:
ZONING:
SIGNATURE:
CLEAN UP DEPOSIT REFUND TO:
TOWN OF VAIL
75 S. FROMTAGE ROADvArL, co 8L657
970-479-2L38
DEPARTIVIENT OF COMMT]NIW DEVELOPMENT
NOTE: THIS PERMIT MUST BE POSTED ON
MECIIANICAL PERMIT
ilob Address. . . z 2645 BALD MOI'NIAIN
Locatrion.. .... : 2645 Bald Mountain
Parcel No.. . .. : 2101-034-oL-027Project Nurnber : PR!799-0031
.APPI,ICAI{T COLORADO PLIJIIBING SERVICE, INC.
2335 AIRPORT ROAD, RIFLE CO 81550
COMTRACTOR COLORADO PLIJMBING SERVICE, INC.
2335 ATRPORT ROAD, RlFr,E CO 81650OWNER SHAPER STEVB
5251 ITESTIIErMER, HOUSTON,TK 77056
DescripEion:
Mechanical for Radiant Panel Heating System
Fileplace InforEaeiolr: ResCricted: Y SOf Oao Applianc€s:
;IOBSITE
PermiE,
AT AIL TIT'IES
#: M99-0078
RD
Rd
staEus...: IssIlED
.Applied. . : 07 /L4/L999Issued...: 07/20/L999
Ex;rires. . : 01,/L6/2oOO
rr**tr.r**rlr*. FEE souti,lARI rrtir*r**rrr*ri
Valuation:
flof Ga€ Logis:
Phone: 970-625-0764
Phonez 970-625-0764
18, 000 . 00
*of wood/Pallet:
Division:
t ccbanic.l--->
Pl,ar ch€ck--->
Itlvestigatsion>
wiIl CaII---->
35O. OO R66tuarant Plan Revier-->
90.00 DRB Fce--------
.00 ToTAI FEES-----
3 .00
.00
.00 Additional Fee6--------->
453.0o Total Pcfilit Fca-------->
Paldenta--------
.00
{53 .00
{53 .00
BAIANG DT'E... -
raa *ar, * ** Jttt t rtr rt*t ttr J+ + * ir *t r r|t r +rrt r a* rt* a + J * r*
DepE,: BUIIJDING Divieion:to iIRl
tlt Jttttttttttt*ttt t tt tat ttittJ t 'rirt a t trr tJ t, t*
Item: 05100
07 /.L4/.1,999
07 /L5/199907'/20'/L999It,em: 05500
07 /L4/L999
BUIIJDING DEPARIT{EMTKATI{Y Action: NOTE Rout,ed
L.2.
3.
4-
5.
6.
7-
8.
IGTIIY Action: NOTE Routed Lo CharlieCEARLIE ACt,iON: APPR CHARLIE DAVISFIRE DEPARITI{ENT DepE: FIREKATITY ACt,iON: APPR N/A
CONDITION OF'APPROVAL
FTETD INSPECTIONS ARE REOUIRED TO CHECK FOR CODE COMPLIAI\ICE.col,tBUsTIoN ArR rs REQUTRED PER SEC. 701 OF THE 1997 I'MC, ORsEqrroN 701 0F TrrE 1-997 rMC.INSTAI.I,ATION MUST CONFORM TO MANUFACTT]RES INSTRUCTIONS AI{DTO CHAPTER 10 OF TIIE 1997 I'MC, CHAPTER 10 OF TIIE 1997 IMC.
GAS APPLIANCES SIIALI., BE VEri[TBD ACCORDTNG TO CHAPTER 8 A}TDSIALL TERMII\ATE AS SPECIFIED IN SEC.8O5 OF TIIE 1997 I]MC, OR
CHAPTER 8 OF THE 1997 IMC.
ACCESS TO HEATING EQUIPMEIIT MUST COMPLY WITII CHAPTER 3 A}iTD
SEC.1O17 OF THE 1997 IJMC AND CTIAPTER 3 OF TIIE 1997 IMC.
BOIIJERS SHALI.,' BE MOI]NTED ON FLOORS OF NONCOMBUSTTBLE CONST.
UNLESS LISTBD FOR MOUNTING ON COMBUSTIBLE FLOORTNG.
PERMIT, PI.AIiIS AIiID CODE AI{ALYSIS MIUST BE POSTED IN MECIIANICAI,
ROOM PRIOR TO A}I INSPE TION REOUEST.
DRAINAGE OF MECTI,AI{ICAI ROOMS COI.IIITAINING IIE,ATING OR HOT-WATER
SI'PPIJY BOII'ERS SIIALL BE EOUIPPED WITH A FIJOOR DRAIN PER SEC.L022 0F THE 199? uMC, OR SEerrON 1004.6 0F TriE 1997 rMC.
* * *.****.*** ******* * ** * * **l ** * * * *** ***** ** **** * * * ** *l *************************
DECIJAXA:IIO!{S
I h.r.by .etsloul,.dgr that. I have reld ctrL. el4rlieaticr, filtrd out ln full t'h. infofllatiolr requilrd, ceElrl.c.d rD aocurat. plot.
Plfi, and gtrta EbaC .lI Ih. Lnfolrratig(l pEovidcd ra r.quired i'e cor!€ct. f agree to ccrq)ly siih hhc inf,or[agi@ -rd ploc plrn;
to colDly wiCh Ell torn ordl,nrnccg and .taia lar6, and, Uo bulld tdrl.. Eeluctura aeeordlng !o tha tovn, I zonlng .nd gqHLrrili(|n
codca, daeign rrvlrr a;rprovcd, unifolE Euildirg Coda |nd oth6r grdlnanqsr of the toryn epplicabla tsh.r.to.
REaUTaTA FOR IITSPEGTIOIS gmllJ tsE IGDE Il{BtTg-FOm IIOIIRB M ADVAICE BY IELEPEOI|B AI 479-2133 oR AT OItt OFFTCE !trOI g:OO Il 5:OO Pir
9I6-!I[TUNE OF. OIONR OR, EOTITRACIOR AOR HIMSELP AND OI{NER,
l!c'l ot vtltJ, @LoRlDo gtrcrnnE
StaBeanc tlhrub€r! REC-o5{I Anount ! 4A3,OO O7/2O/99 L1t43
F.lmene r,.rhod r CK NoC.Uion: 3OOSS7/CO PIrt ]tB Inli,r JH
PlrBit ne: I99-oo7g Typ.: B-MacH uBcltA}tlctlr pEnlttt
F.rccl lfo. 2101-03{-01-027
El,t. lddr...: aa,ag BII.D. IOInTAII PD
I€crELon ! 26{5 Bald '|ountain Rd
Total Fees: 453.00
tbfu PryrGtt 4s3.oo Sotal Ar;rJ pu'ts: a53.oo
Balartce: .O0
rt|rr*ttttltltrtitirtit.attrtftirttrlrtr r.r*tttttatr.ar**r*t
.lroount' Cod. DagcripEion .l!oun!
xP 00100003111300 r|EcHnHIctIr pgRrrr FEES 360.00
PF OO1oOOO3112300 PrrNt CrtEqK FEBS 9o.OO
tfc ooLoo00311rgo0 tfILL CA,LL ItlspBcTlon FEE 3,00 '
"O*urn.' JobAddrcss: Zt'qs R&\d fflfl. Rd.
Electrical ( )Mechanical p{Other ( )
TowN oF vAt#NSTRUcIoN pERMr nilrcATtoN FoRM
Plumbing ( )
l,ot Block Filinq Subdivision
OwnersName: Sh0pe(Z Address:
Architect:Address:
Building ( )
Legal Descripion:
Phone#
DuqQ. oogt
Mt-ooos INFORMATION MUST BE COMPLETE OR IUE APPLICATION wlLL BE REJECTEII
Contact the Eagle Courty Assesso/s Office at 970-328-6640 for Parcel #Parcel# elot .oa{-Ot -O21
7 - t4'q1 Persdt #
Description of Job: i\D'). r.o ^-
Work Class: New ( )Alrcrafion ( )
Number of Dwelling Units: / SFF-
Additional (4) Repair ( ) Other ( )
Number of Accommodation Units:
TOTAL $
Phone # Glroi q/6 - assq
Address:
Phone #
Address:
Town of VaiI Registration No. - Phone #ffi0nAMechanicalContractor: (Lta,..ao P/*r&^, ietw<-Address: 23ts tfurl.-rDr. P,ke &t- Stggcs
FOR OFFICE USE R E[:h;:,1::1:.'U.tlL. , ,, :j99
BUILDING:
SIGNATURE:
ZONING:
SIGNATURE:
/\ >-PrU.nb.nq Strrutt-c-'CLEAN uP DEPoslr REFUND To: LloLoeArrc
a t 1t11r6tt>
Number and Tlpe of Fireplaces: hs Applintc6-& &.-2-- Gas Logs
BLJILDING: $
VALUAT]ONS
ELECTRICAL: $
PLI,JMBING $
General Contrector:caq.n ao',t;Tu*7'..\ Address:
Town of Vail Registraion No.
Dlectrical Contractor:
Town of Vail Registration No.
Plumbins Contractor:
Town of Vail Regisfation No \l'1- ff\
MECHANICAL $ tYoao -
CONTRACTOR INFORMATION
OTIIER: $
Wood/Pellet
9761 Qa{-o76Q
Heatloss ttarysis Report
WIRSBO Radiant Panel Heattng System
ProJecf#;NN
Ihte: tl/1311090
Prcpared By
Colorado Plumting Seruice Inc.
2335 E.7tt $t. Sotttt
Rin€, Co. E1650
Phonc* (970)62il7€6
Fot# (970)0A5-0776
By: Bob Stafler
Proiect Infonnation
l{ame: ShapcrRemodellocalisr: Lot 10, Blod(2
Clocing D.b:
Prciect Summary
fodalH6efLos$
Floor Downward:
Ceiling Uprad:
O&cr Componcnts:
$upplemcntal:
Tffil RPH Load:
Tobl ComHncd Load:
ftrcftd'gSt/dorrw'/',
'10,69|ffir'hr
1,530 Eht/hr
26,66? Bht/hr
(0) Btu/h.
36,E80 Etu/hr
36,EtE Btt/hr
ffiier:
Eqlinecn Bob Statcr
Total Ar6a:
OuUoorTcmP:
1,130rF
-20"F
Rooms Requnng Supplementil;
Detailed Heat Loss Data
Room: Fandly noom
GmesAra:
Ceillng Helgt|t
Vdum€:
Perimeler Length:
Air Chang6s:
Room Temp:
Room lnfi ltratlon:
595flr
11ft
0,545fir
0ft
0.50 per Hour
70'F
5,625 Bturhr
T<l'',rLo'sj
Fl@r Dc[YnYvanl:
Ceiling Upvad:
O$€r
5,950 Btu/hr
1,530 Btu/hr
18,17.[ Rdhr
Net RPH Load:
Urfr RPH tie?il Lo€d,:
Fl@r
C,ciling:
4ii.1 Btu/hrtlr
N/A
FloorComPonent
FlootAr€:
Unh€eiled Ar€:
Nd Heated Area:
FlorType:
Fltor Cover R\,:
Floor Insulation Rv:
Edge Rv:
Perimcter Rv:
Temp Bddu
Slab Depth:
5S5 fl3
0tr
595tr
Susp€ndod
1.00
5.00
N/A
1{rA
60'F
NI/A
WdGr Tablo Pro66ne
Space Belcn , H€d€d:
Floor Surface Temp:
lffil-ogg,;
Do,i,nuiatd Lo6s:
Up'md Led:
Supplernontal:
l,let Floor Load:
Unit Hest Lo€d
N/A
Dlfr Source
86.5 "F
5,9fl) Btu/hr
19,7O4 Btu/hr
(0) Btu/ttr
25,09f Btu/hr
43.1 Btu/hriff
Pagc 1
WIRSBO *t, Panel Heatng SPtem
Prdect/f Cgn
Ire'ci 07/l3l1wg
Ceiling Component
Sp€ce Abo/€ Heded:
Coiling Aroa:
Unh€ated Ar€a:
Net Heated Are:
Ceiling Corer Rv:
Ceiling Insulation Rv:
Ceiling Surfaco T6mp:
tlo
595 ll3
595 nF
0fl3
N/A
35.00
70.0 "F
t rrt t @;(less sub components if any)
Do'\rnward L€d:
UpwErd
Loss:
Supplemetrtal:
Net Ceiling [oad:
Unit He€il Load:
0 Btu/hr
1,53Q Btu/hr
(0) Btu/hr
1,530 Btu/hr
N/A
Room
Com ponent tcngth I
width (ft!
Height (fl)Arc.(rF)Rv llcrt Loss
(Btu/hr)
Walll 29.00 11.00 319 20.00 1,287
Doorl 3.00 7.00 21 5.00 378
Windowl 2.00 3.00 6 2.00 270
Windovr2 2.@ 3.00 6 2.00 270
Wal12 29.00 11.00 319 20.00 868
Doorl 6.00 7.00 42 6.00 756
Doo12 e.00 7.00 42 5.00 756
Windou/1 2.00 3.50 7 2.O0 315
WindoM 2.00 3.50 7 2.00 315
Window3 9.50 3.00 28 2.00 1,260
Wal13 24.00 9.00 216 20.00 742
Windovrl 2.OO 5.(x)10 2.00 450
Windor2 2.00 5.00 10 2.OO 450
Windor3 2.04 5.00 10 2.00 450
Windo,4 2.00 5.00 10 2.00 450
Windo/vs 4.50 2.50 11 2.00 495
Wd14 24.OO 9.00 216 20.00 742
Windowl 2.00 5.00 10 2.N 450
Windovv2 2.00 5.00 10 2.00 450
Windowg 2.00 5.00 10 2.OO 450
Windor4 2.00 5.00 10 2.00 450
WindorS 4.50 2.50 11 2.00 4S5
Room.'Garage
Gross Ar€:
Ceiling Height:
Volume:
Perimeter Length:
Air Changes:
Room Temp:
Room Infiltration:
535 f
11ft
5,885fl9
0ft
0.50 per Hour
60 "F
4,t196 Btu/hr
Totef lileaf Loss;
Floor Domwanl:
Ceiling Up,vatd:
Other
4,744 Btu/hr
0 Btu/hr
8,.188 Btu/hr
Net RPH Load:
Unt RPH Haat Lod:
Floor:
Ceiling:
24.7 &u&rfi:
N/A
FloorGomponent
FIOOI AIEA:
Unheat€d Ar€€:
Net Heied Area:
Floor Typ€:
535tr
0fF
535 flF
Shb On Grede
Wailer Table Ptesecrt:
Spaca Belour Fleated:
Floor Surface TemP:
,trf fct,'
No
N/A
67.9'F
UnRSBo n"tt Panel Heafing system
Prctiacf,fii 9929Itebi Oillulgls
Floor Cover Rv:
Under Slab Rv:
Edgo Rv:
Perimeter Ru
Tetnp BelcnM
Slab Depth:
0.50
5.00
5.00
5.00
35'F
4 inch6
Dorvnurard Loss:
Upwsrd L€d:
Supplernental:
Net Floor Load:
Unit Heat Led
4,744Btulhr
8,488 Btu/hr
(0) Btu/hr
13.232 Btdhr
24.7 Btu/hr/ff
Ceiling Component
Space Abore Heated:
C€iling Ar€a'
Unheated Area:
Net Hegted Are6:
Ceiling Cwer Ru
Celling Insulation Rv:
Coiling Surlee T€mp:
Yes
535 fl3
535 f13
0ll3
N/A
35.00
00.0'F
fre.t Lo6.; (l€ss sub components if any)
Elomrruard Load:
Uplvard
Lo6s:
SupplomGntal:
Net Ceiling Load:
Unft Heat Load:
0 Btt/hr
0 Btu/hr
(0) Btuftr
0 Btu/hr
N/A
Room
Component Length /
wtdth (fi)
Hcbm(n)Ar€r (tF)Rv Heat Locs
(Btu/hr)
Walll zl.l)t)1.00 297 20.00 592
Doorl 18.00 8.00 14 5.00 2,3U
Windowl 2.00 2.50 5 2.00 200
Wal12 7.00 1.00 n 20.00 224
Doorl 3.00 7.00 21 5.00 336
Wd13 't2.o0 7.00 u 20.00 336
l'lo6gc: The intendcd use of this program is to p1oride accurate heat loee and d66ign dgh for Wirsbo Radiant Syetems. The heat
h6s and d6ign data g€ner"tea Oy ttr" 'program will only be s accur€*e as the information supPlied. Wirsbo Company is
not re6poffiible for th6 misuse of this program.
frsign Review lct?n Form
TOWN OFVAIL
Project Name: Shaper
Project Description: new garage
Owner, Address and Phone: Steve Shaper, 5251 Westheimer, Houston,TX 77056-5404
Architect/Contact, Address and Phone: The Resort Collaborative International., 1000 S. Frontage Rd.
West #300. Vail CO 81657
Project Street Address: 2645 Bald Mountain Rd
Legal Description: Lot 10, Bl2, Vail Village l3th
Parcel Number: Building Name:
Comments:
Project# PRJ99-0031
Motion by:
Seconded by:
Vote:
Conditions:
Town Planner: Jeff Hunt
Date:5-13-99
F:/EVERY{JN E/DRB/A PPROVAI-/9gishap€r
Board / StaffAction
Action: staffapproval
DRB Fee Pre-Paid: 200.00
itii l
o PROPOSF.D LANDSCAPING
PROPOSED TREES
ANDSHRUBS:
EXISTING TREES TO
BEREMOVED:
Botanical Namc
Picea pungens .
Common Namc
Colorado spruce
Colorado spruce
Atnntitv
10
Sizc'
_8'-l0,
8t
Colorado spruce.4',- 6',
'Mininrunt rcquircmcnls for landscaping:dcciduous trccs - 2 inch caliPcr
conifcrous trccs - 6 fcct in hcight
shrubs - 5 gallons
Squarc Footatc
GROUND COVER
soD
SEED
IRRIGANON
TFEORMETHOD OF
EROSIONCONTROL
Tvnc
Na t lve 1,5O0 +/-
Blue grass 2,5o0 +l-
all areas
OTHER L^ANDSCAPE F.EATUnIS G.t"ining.walls, fcnccs, wimming pools, ac.) Plcasc spccify. lndicatc top and
bo[om clcrrations of rctaining valts. ivfaximum bcight of walls within thc front sctback is 3 fccL Maximum hcigbt of
walls clssrrhac on thc propcrty is 6 fc*
Wall attaching existing structure and extension.
Spa as shown on plan.
MAR-O3-99 1?.Oo FROM. LAND TITLE GUARANTEE I,AIL ID: 3o3 4?6 4334 PAGE
oI,D RNI,IC NATIONAL TITLE INSURJG COMPANY
ALTA COMMITMENT
SCHEDULE A
Our Order * vTF2550?3
For InformaLion onIYz*zffi
1.
r.-,fl..rve.'€
?14p--r>-..l-At
:t\€<. %?-a.z-=, -
z ?# <-"jFl<rli--
iar THIS IS NOT AN
TO THIS ORDER,
Effeccive Date:
3.
4.
5.
rN'OICE, BIIT AN ESTIMATE OF FEES. WI{EN REFERRING
plnase ierserNcp ouR oRDER No' vtr'255073 *ir
z /,2-lq7 aE 5:00 P-M.
Thee8tateorinlere8cinthelanddescribedorreferredtointrris CommitmenE and cowered herein is:
A Fee SimPIe
TiEIe ro tshe esEage or inEeresE covered herein is aE Ehe
effecbive daEe hereof vesEed in:
=rf€Pr rE--J 5 t+r1e,ge- {-
to in Ehis Corunitment is deecribed as
Sw e' Z--
>-vr,*g4
The land referred
follows:
I,OT 10, BLOCK 2, VAIt VIIJI'AGE TITIRTEENTH FILING ACCORDING TO
THE RECOR.DED PIAT TI{EREOF, COUNTY OF EAGLE, STATE OF COLORADO'
PAGE
MAE-O3-99 l7'OO FROM: LAND TITLE GUARANTEE
AL't'Ia, (iMMllMIlNT
S(:HUL)ULE N - 2
( h'x(:{,tpL.iorl$ )Our Order: # V'fF;Irrr0'/ 1
'llrcr pol i r:y rrr- 1rr.rJ. i 1; i(.rr.i t o be i.ssrrerj wil.l corrl.;rirt exc-^pL j.orrs L.r.r t'.lre
I'o1lbwirrcy L t.l r-)Jil: f,lt('.t s:iltne :rrc: CtiSpOseCl of f-o thc SaEi5facf.'icrrt of.
r. lrrt Ccttul:r.'tttY :
.l . t;f-;rlr(l.rr.cl Ilx(:C[]t'.i<Jtt*: I l-.hr()rr1lh 5 printed (rtr LhC cOr,.er: Slreef..
f;. 'firxt:$ ,tttrl ;tt;:;r:lr:tlrirlr.s tr()t. ycl- due or: p:ryable and special
a$[;(]$t.inlerlf.r.i I|()1. yet: cprt j t j r:d t.o the 'frr:aliurer' sl rlf f it:e.
'l . /\rry rrnlj.r i.l t .|xr':1.'i ()l- il:i:if r:i:;tl\ritlL il agai.rrsr. said .l.and.
B. LierL*t t.ot ttttp.-r.i.cl wirt.t*r ancl sewer char:ger, if atry.
9. Rl(,ilt'l' Olt ltlt()!,t{.LU'I'Olr Ot? A VFTN ()R LOL}U TO II|XTR.AC'r /\ND RUt'l()VU lllS ()fiFi
THLIH.K:IIR()M :]IIOt'f.I) TI.IN $AMF: tsIJ !'OUND TO PENEI'RATE OR INTNR.SNC:'I' TI{FI PIIb:MISES
AS I{li:ljttttvF:Il lN l,NI'I'EIJ S'lA'ftijs PATF:Nr RECOI{$ED May 06, l'r0l;, lN IJOOK 4B AT
PA(:ll;i rr0r).
ru. R:t(lrn' or.' wny t'ol{ l)rr,cltus oR CANALS CoN,STR.UCTF:D BY 'rHE nU',I'lloRI'IY OIr 1'Hli
UNT'I'hiI) !,i'['A'I'I:JIJ A{J I?.DSTiRVED IN tJNI'TBD STATF:$ FATEN'I' RECORT)BD MNY (}(" 1.(JO'J, IN
ts(X)K 48 AI.t,A(-;tl l;09.
11.. RF:ti't'Rt(i't'l.VLl (lC)vI'NANTS, t^ilIT(:H DO No'I CONTATN A l'oRtEI'I'URu Oi{ Fnvnft'rl':l{
CLA(JT.Jh: , BTTI'()MI'I*TTN(; RI.:S;'IRIC'TIONS, TF ANY, IJASED ON RACR. (:0I,()R. h'.h:I.'I.GI()N.
oR NA.f roNAl, ou.t.(.itN, AS CONTATNF:D IN INSTRUMENT RECORDED ocrt.()l.rr:rr' oll , l.r'lt,
IN tt(X)K J..1fi A'r l.,A(;tj 1.46 ANt) n.S AI4ENIJBD TN INSTRUMDNT RIICORDFID liePt.r..'tttlrr-rr lil,
l(r./tl , IN lt()(Jt( 2'7ri A.i b'A(.;u (;28.
.l t1 . EAtit.iMt{N't.'li , RutirihtvNfIONS AND RES'I'RICTIONTj AS-; S!{OWN OR RESERVtiD oN 't'tlL:
RU(IOITf II{I' I'[.I\''I' (.'I;' VAlI, VILLATJE TI.IIRTEEN'I'H I'ILING.
vArL ID: 3O3 476 4534 PAGE
l.'A(lll
IECOHEN
F-ffHI**trU"LtrTTf,OF TRANSnflTTTAL
Edwards, Colorado 81632
(n0\92csffi
EAX (970) 92634/,4)
WE ARE SENDING YOU {Attacnea Under separate cover via
d Plan"! Shop drawings
E Copy of letter
!
Printstr
tr Change order
Samples
the following items:
I Specifications
d
oon 5 ltq lqt l'oun?q - )9,'
ATTEIITION -
^'' 3v rf 6rr- fl
*t^vf Bht> mru ft.J)
Vrtru 6
coPtEs DATE NO.DESCRIPTION
2-f lts lcs ?LeNs att-P€tttrltr hgy'et LtFna^)
I {ltc ltt (-auqrlutcfr-ta.P,n,rn '- H/t-tcrrnd,)
flnln Qoat^ c-- u/*v Pcrr,'..r lfllvt (*r'tt\) *b7n" a<
t clnlqt (aurm,xalou Prrr.u-.,uu Pu*tt ^ror a-a qc,fttE
THESE ARE TRANSMITTED as checked below:
! For approval
{F' yor, ,".
E As requested
D For review and comment
tr FOR BIDS DUE
Approved as submitted
Approved as noted
Refurned for corrections
tr Resubmit
-copies
for approval
tr Submit
-
ccoies for distribution
I Return
-
corrected Drints
tr
n
tr
D
19
-
tr PRINTS RETURNEDAFTER LOANTOUS
REMARKS
SIGNED:
COPY TO
ll enclosures are not as noted, kindly notily us at onca
0l/20/0O 12:15 llg70 928 3410 COEEN CONSTRUCTI
Jah-19-OO O3:39P AIA Pla:8tics./Industrles 3O3 e96 214€|tl
@ooz/oozP-Oe
R.I.fl. industries Jannry lq zom
732-1MEM R.IR
ffinCxtreCru RAL PBODUCTS
To: COHEN COISiTRUCTION' INC'
21o Edrmnls Vltlago Blvd., A2[)1
P.O. Box'tE89
Edwards, CO E1632
AGrrtion: Jefi Cohen
Frorn: Frillk Kri€deman
Job: ShaPer Rec-, Vail, GO
Re: Skylighl info
PurEuanl lo yorr requesl fc desbn infoarElim Al the s||(ylighl io. lhc above mentiored prcpct rrc fitrd the
followng
1. Skylighr O-C.D. is 97' x Et" for a bt l ot tf.56 sq' fr.
2. Glazim is .250 acrylicformEd inlo a 5;t2 pvramid slrape
3. Allowing br a toad reclJc$qt due t0 lh€ pyrnflid shape and sabty factor of orc. s|9 see no
problem with this writ meeting erct dogign rsquilements'
Pl€ase fe€l free to call wiUl any qrestims corwning ftig project'
$incerely,{Z- fr,-.(*
Frank l(neclemen
Design D6partmetrt
Ol ' t7- oo
5r*r Gu.", Fh+s Bet11 a6nplp6 oF uBr ' 2eaur'ze-rwt-'ul-s'
til PgAn€OS ?6 d.a+s'1.1s21,61./s1 . Sat- ut-s€ k-+ta^ts rC. DeSrer.r
13 M:re*rn Fec>m {cBB" A+Famt, Uz- MOS|- 06-fl+a^J a-ryd APPPo\jF(- 0,C .
29OEast56thAve. ' Denver,GO80216-1711 ' 303-296-9696 ' Fax: 303-296-2146
OV2n/00 12:15 ss70 028 s140
ittltllttat
t
TO:
ATTN:Charlie Davis
PHONE: 479-213€ -
FAX NO.: 47$2452
9a9tra.rr.trrr!r'rrri,r.r.rtt..rtaairrraa{rrrrr.r.r.t.t.ta.t.tttti.r"ttrrtrtrrrt
Re: Shaper RsmodeUAddition, Pemit #899-0130
In reeponse to yout requost for information regarding the skylight installation at the abovE
refsrenc€d project, attached is a letter I received trom the manufacturer-
COEEN CONSIRUCTI
*ilta.r.ttrrrtrraalllaltltlrl.t..n..r.Irtrt.ttal Itt'
Gohen Construetion, lnc.
@ ool/oo2
210 EdrYards Village Blvd,, A-201
P.O. Box 1889, Edwards, Coloado 81632
Phone:
Far:
(970) 926-3443
(970) 926€440
FAXTRANSMIfiAL
DATE: 1/20/00
FROM: JeffCohen
NO- OF PAGES (incl. cover sheet): 2
Hard Copyto lollowvia Mail: Yes Nol_
f
s
ll---
I
=
ul
n-n
l
ooz-TI
o-cn
J
6z
$I;
EqF
cz
SHAPER REMODEL
LOT 10, BLOCK 2
VAIL VILTAGE
The R.*rt Design
C otlaboratirre I ntemarional
Sheet No :
ASI#3
lq
lR
l$
-Jo7m
f,zm
mfr
Eqds{sjr8
.ofo'+q.-z
G\
icE
i3d
flils>E
mmz
(DI
T
6
E-l
f[r
F
X
{{l
G\tr ot-- Ff;df;q{[
SHAPER REMODEL
LOT iO, BLOCK 2
VAIL VILLAGE
Ttr" R.rc* D.sign
C o llaborative I nternational
Sheet No :
ASt#3
..-\<
REP?I3I IOXI OT,VAIL, CoLORADO PAGE I[
AREAT CDCI2/L3121ilm O7t45 REQUESTS - IIISPECTII UORI( SHEETS FOR: 2lI5f2O
Aotlvity: 899-O13O 2/l5lm Type: A-llF Statuel fSSUED Congtr: AllF
Addreser 2645 BALD llOUllTAIll RD
LocatLon: 2645 BALD llTil RD
Prrce].r 2L$L-O34-0L-O27DeeoftttLon: BUILD GARAGE UITH LIYI!|G SPACEt1flitant: COHEII COIISTRUCTIOI|
t*nerr SIIAPER STEYEr{rtrrotorr GtlllEll COIISTRUCTIOn
Uger Y l-HROcc:
ABTIVE(REIiODEL'
Phone: 97O-926-3443
Phonel
Phone: 970-926-3443
r-rt*lr ltfOr, old tloticea....
Ad?I|GTTlfi.torr TGO'd rLth bond to finLgh rail, hot tub doors
A;;;;;-;;;;-;;;;;;;;;;,....--- ---- ------11-
feffitfr: JEFF Phon{: 92F-B$A}t "lfar O8:l Comnente: DOOR & HAITDRAILS I r rt\ r nrtItet r{rcrtcd to h rnspected-.. Actlon Conlents l^ [l t ' fVV Irr:ll5-Eaai ^ ir
Tl.re Exp
+L l*-*j/crA2-1"* J-4u-o -.to 0 9s
Inepeolltn llaiory..... 6/-{Itrnr {51O drJ-vevay grade fl.nal
'Cnfi)41,t-z-A;Vr,ifr<
APPR'YED r'ffftur Otrfa B|.DG-Footi-nga/Steel
l|6.lLel99 Inepectorr CD Actionr APPR
' I|tea: 6TEil HALL FOOTIIIG IIOT If,STALLED ATItrr: CI BLDE-FoundatLon/Steel
@r2Vl99 fnapector: CD Act!.on: APCR APPRBVED/CORRECTIUII REODllotee: THIS IllSPECTIOll DOES llOT IIICLUDE THE STEII HALL ORTIE IN TO EXSITIIIG FOUIIDATIOII
ADJUST REBAR I'AT TO OBTAIII 2' CLGANAilCE FROil FORII BOARD
AT THE BACK UALLIterr OA52L PLAII-ILC Foundation Plan
O9/Ogl99 Inapector: CD Actl.onr ll0 lle routed to allieon
l|gl97 l99 Inapector: AO Ar:tion: APPR APPROVEDIterr OO5.2O PLAil-ILC Slte Plan
O9lO3/95 Inspector: CD Actlon: ll0 iJ.c routed to alll.son
W/O? 199 Inapector: AO Actlon: APPB APPBOVEDIterr U|/|.3|, BlJ)6-FraulngO8lW99 Inepectorl GD Actl.on: Dll ILC REC'Dllotee: A FOUtlDATIOll ILC Rm'D SEE COIIDITIOIIS COITTRACTOR
HAS BEEX ilOTIFIED AT lOr4O At Algl99
Agf07lgg Inepector: CD AstLonr APPR UITH COnnECTIOftllotegr COIIPLETE NAIL OFF OF HAIIGER AT TRIPLE 2tlt2 III ROOFIter: 0OOSO BlDG-Ineul.ation
Ogl$gl99 Inepector: CD Ar:tLon: APPR APPROVED. llotee: franlng correction radeIten; Wil|6;O Bl.Dti-Sheetrock llall
09/16.199 Inspectorr ART Actlon: APPR Appr partLal ae notedlllotes: APPnOVED DBYTALL FASTEnIIG AllD IiARAEE/DUELLIIIG OCCUPAIICY
SEPARATTON TITH EXCEPTIOil OF TTO RECESSED LIGHT FIXTURESln THE GAnAGE CEILInG, PEI|ETRATIOITS EXCEED 16 SC. Ilt.Eit..
COIITRACTOR IS TO CALL F.oN f,ETilSPECTIOlr OF THIS AREA
THIS TIIIE SEC SI/3
9912?199 Inepector: GD Arvtl-onr APPR CORRECTIOII IIADE
REPTl31 TOUII t'F YAIL, COL{'nADO PA6E 5
AREA: CDOztl1lz0W O7t,45 REOUESTS - ItlSPEcT[ r0nr SHEETS FOR; 2tt5/20
====E==========================E==E========r==== ==== = == = = ===== = =======E= = = ===E=E=. I|oteg: CAil LIGHTS HAYE BEEII BACK BOXED ,fITH s/SITYPE X DRYTALL
TO COIIPLETE FIRE RESTSTIVE ASSEIIBLV AROUIID CAil LIGHTSIterr ees:l3 PLAI|-TEIIP. CIO
OZIOSIOO Inspectorr CDlloteg: bond ig Ln palce atthe Hot tub end hand
62164lg0 Inepector: ALLfSOil AtrtLon: APPR conditLonsIterr oo530 BLD6-Tenp. CIO
O2/W/6O Inepector: CDIterr amOTQ BLDG-ltisc.lters WrO9f| BLDG-Final
L2123199 Inepector: CDllotee: -rerove outhouge
-tenp handrsil-g do not corpl.y to UBC desl,gn gutdlLnes of
reeJ.etLng 2Ol per li.neal foot preaeure
-plannlng dept approval regul.red. The proJect regul-ree anenclogure to connect the garage to the nsl.n Etruature. Th1g not corplete at this tLne
Actlon: APPR per slll-al.on . .'thl'e tl.re. lluet f,Lnleh the enclosurc
raLl. l.netalatlon
Aatl-on: APPR conplete the
Actionl Dll eee notee
\\-\v Ls"-
\
- ".", i- -r.tr'.
()N-." q .n,
\V q$t$ ','f !s'\ x,*\r,rvt.^q 5
,}x\
-.$\''$l g
fj/.1{-a..u n
V *-No .t; b f oi'1:i\'w-o r{1dtr p...^\'
' \'\--- .l\ .'-1',^.*,-,,.g"'\1q1*
t
Departmcnt of Commwity Development
75 South Frontage Road
Vail. Colorado 81657
970-479-2138
FAX 970-479-2452
February 22, 2000
Ath: Letter of Credit Department
Nonrest Bank International
633 l?th ft, 3d Floor
Denver, CO 80202
Cohen Consblction
PO Box 1889
Edwards. CO 81632
RE: Shaper Residence Remodel located at 2645 Bald Mountain Rd. /Lot 10, Block 2, Vail Village 13e
To Whom It May Concern:
The Shaper Residence Remodel, located at 2645 Bald Mountain Rd. / Lot 10., Block 2, Vail Village t3h,
has been completed and received its Cenificate of Occupancy. Inevocable letter of credit # 540?365 can
be released. If you have any further questions, please do not hesitate to contact me at 970 479-2369.
Allison Ochs
Planner tr
Tonn of Vail
d
{p*u* "o
*axr &maa
LETTER OF CREDIT FOHMAT
THIS AGFEEMEN-T, made and entered.into tfris /{ft oay of f,ruurr",, , t_gfl$ 1!onS Gu,r*, 6-'.r,--,^r.i-*- "
inereinatter calei tnJ Oevetope/,), and theTo-wN oF vAtL (hereinafter catteo t|'";;fiwn ; anit tuolii"gi elo". '
thereinaftercalled the "Bank").
_,--- y^lFHElSl !!" Devetoper, as a condition of approvat of the _P:T^1.1i:d_^# ts_t!...- wisnes to enter innolbweropd
WHEREAS, the Developer is obligated to provide security or collaterat sufficient in thejudgment of the Town to make reasonable provisibns for compleiion ot certain improvements setforth below: and
WHEREAS' the Developer wjshes to provide collateral lo guarantee performance of thisAg.reement, including construction ol the above-referenced improiements by means of thefollowing:
lmprovement Agreement; and
Developer agrees to establish
3rrrymr--Ra-
>€9.
of credit with a Bank in Eagle County in a dollar
the tolal cost ot the work shown below) to provide
IMPROVEMENT ftL 1116 c,oirfuEno^.r o? 'TH6 6u.zlotpA :
. 9yi l,v-.Hf l2,ooo e
. Hor TOG \Doo lL S { i?lr}n Y, ooo .;.
. An*gtfr1eL lrf o4gnr;,, +t*.rts- ll O Og lL
| 8, ooo
t 2, ooo
9-
Tor*:,-t lo, ooo z*
NOW' THEREFORE, in consideration of the following mutual covenants and agreements,the Developer and lhe Town agree as tollows:
1. The Developer agrees, at the sole cost and expenses, to furnish all equipmentand malerial necessary to perform and complete all improvements, on or before
%The.Deve|opersha||comp|ete,inagoodworkman|ikemanner,a|llmprovements as listed above, in accordance with all plans and specifications liled in the office ofthe Co.mmunity Development Department, the Town of Vail, and tb do all work incidental theretoaccording to and in compliance with the following:
a. Such other designs, drawings, maps, specifications, sketches, and other matter
submitted by the Developer to be approved by any of lhe above-relerenced
governmental entities. All said work shall be done under the inspection of, and to
the satisfaction of, the Town Engineer, the Town Building Ofticiai, or other official
lrom the Town of Vail, as atfected by special districts or iervice districts, as their
respective interest may appear, and shall not be deemed complete until approved
and accepted as completed by the Town ol vail community Development
Department and pubtic Works Department.
2. To secure a.nd guarantee perforrnance of ils obligations as set forth herein, lheDeveloper agrees to provide security and collateral as follows:
lrrevocable letter of credit #:E:!.:eZALd_in the amount of $_!A-_o,oo__Z__with l\Jo.n-wr<ar- ?n^rz- (name of bank in ragil6 county) as
the security for the improvements set forth above if there is a def-ault unoeiine
Agreement by Developer.
l€gal Doscriplion: Lot_ Block _
Fage I o[J
3' The Developer may at any lime substitute the collateral originally set forth abovefor another form ol collateral acceptabte io tne rorn io ;r;;";il;ili"itnrur comptetion of thoseimprovemenls referred to herein and the performance oithe terms of this Agreement. suchacceplance by the Town of alternative collateral shall be ar the Tou/n'a ioie oiscretion.
4. The Town shail not, nor shalr any ofricer or employee thereof, be riabre orresponsible for anv accr-lllt,l?.ss or damage hippening or occurring to the work specilied in rhisAgreement prior to the compretion and acc6ptanl-e of tne sare, nor-si,aiiin" ro*n, nor anyofficer or employee th.t99l'..ug.lilble for any persons or property injured by reason of the natureof said work, but ail of said liabirities snall aird are hereby "irur"J'ov t J oeveloper.
The Developer hereby agrees to indemnify and hold harmless the Town, and nay ot itsofficers, agents.and employe-es igainst any losJes, claims, oamagei of;"ottitie. to which theTown or any of its orficers, qgg11s. or emptoyees may become suo]eci to, insotar as any suchlosses, claims, damages or liabilities 1or actions in respect thereof) that arise out of or are basedupon any performance by the Developer hereunder; and the Oevetoper snall reimburse the Townfor any and all legal or other etpense's reasonabiy incurred Uv 6re i6rn in connection withinvestigaring or defending any such loss, craim, oimage, tiabirity or action. This indemnityprovision shalr be in addition to any other riability wtrict me oeueropei mav nave.
5' lt is mutually agreed that the Devetoper may apply to the Town and the Town shallauthorize for partial release of the collateral deposiied witn rnb'r'orn roi eacn caregory olimprovement at such time as such improvements are constructed in compliance with all plansand specilicalions as relerenced hereunder and accepted by the Town. under no condition willthe amount of the collateral that is being held be reduced below the amount necessary tocomplete such improvements.
6' lf the Town determines, at its sore discretion, that any of the improvementscontemplated hereunder are not constructed in compliance *itn tnebrans and speciftcations setforth in this Agreement on or before the date set forth in earagraph { inJro*n may, but shallnot be required to, redeem the letter of credit as necessary to complete the unfinishedimprovements' The Bank shall release such funds upon wrinen request from the Town statingthat the improvements have nol. been completed as required by thii agreement. The Bank shallnot require the concurrenceot.the developer prior to release ol lhe tunds to the Town nor shallthe Bank be required to verify independently inat sucn improvements nave not been completedas required by this agreement, but shall release such funds sotety upontne Town,s writtenrequest.
lf the costs of compreting the work exceed the amount or the deposit, the excess,together with interest at twerve percent per annum., shalr be a rienalainlitn" proprrty and maybe collected by civil suit or may ue certiiied to the treasurer of Eaglicounty to be collected in thesame manner as derinquent ad varorem taxes levied against srctiproperry. iim";;;;i;;il;'-fails or refuses to complete the cleanup and landscaping, ad delinio ih tnis chapter, such failureor refusal shall be considered a violation of the Zonirig iode.
7 ' The Developer u/arranls all work and material for a period of one year afteracceptance of all work referred to in this Agreement by the Town ii sucn worr is located on Townof Vail property or within Town of Vair righiof-wiy purrr"nt to section .r 7.1 6.2s0.
8' The parties hereto.mutually agree that this Agreemenl may be amended from timeto time, provided that such amendments be i-n writing ano eiecrreo uy atiparties hereto.
Dated the day and year first above written.
Pagc 2 of 1
o
STATE OF COLORADO
COUNTY OF EAGLE
ss.
was-aclqlqwledged- belore me this
Notary Public
-day
of 19_ by
Witness my hand and otlicialseal.
My commission expires:
Nolary Public
Bank
STATE OF COLORADO
COUNTY OF EAGLE
ss.
The foregoing Developer lmprovement Agreement was acknowledged before me this
day of 19_by
Witness my hand and official seal.
My commission expires:_
Notary Public
n!J:,; :i' W ?7 ":V -" * gSeT;
Witness my hand and official seal.
My commission
STATE OF COLORADO
COUNTY OF EAGLE
The foregoing Developer lmprovement Agreement was acknowledged belore me this
Pladner, Community Development
t\owrlrons\torms\dovi mPeg.ltf
Prgc 3 of 3
mfEst &q rKsuffffattf
NORWEST BA}IK MINNESOTA, NATIONAL ASSOCIATION
ATTN: LETTERS OF CREDIT,
ROANOKE BUIL,DING, FIFTII FI-,OOR
109 SOTITH 7TH ST.,
MINNEAPOI-,IS, MN 55402
ieiex NUMBER: 6734665 swrFT ADDRESS: NWNBUS44
TMPoRTS/EXPORTS 1-800-5s3 -3769
,JANUARY 04, 2000
TO:
TOT{N OF VA'IL
75 SOUTH FROIiilIAGE ROAD
VAIIT, CO 81-557
ACCOUNT PARTY:
COHEN CONSTRUCTION
SITAPER RESIDENCE REMODEI-,
P.O. BO XL889
EDWARDS, co 81632
wEoPENIRREVoCABIJESTANDBYLETTERoFCREDITNUMBERS40T365IN
THE AIrtOIlNr oF 1o,ooo.0o usD ( TEN THOUSAND Al{D 00/100 u's'
DOLI-,ARS)
IN FAVOR OF YOURSELVES
EXPTRES APRrL 0l-, 2OOO AT OUR COUTiTTERS
THISIsACLEANIJETTERoFCREDITAVAII-,ABLEAGAINSTDRAFTSDR'A9IN
AT srGHT oN NORWEGi gANr MTNNESOTA' NATT6NAT' Asso_crATroN,
MINNEAPoLIS,MINI'-TESoTABEARINGTIIEcLAUsE:||DRAV{NI]IIDERSTANDBY
LETTER OF CREDIT NUMEEN S407365 OF NORWEST BANK MINNESOTA'
NATIONAL ASSOCIATION I I .
PAYMEMT WIIIIJ BE MADE AT
NATIONAL ASSOCIATION.
THE COUI\I1fERS OF NORWEST BA}IK MINNESOTA'
THIS CREDIT IS SI'BJECT TO
DOCUMENTARY CREDITS (1993
COMMERCE PUBI,ICATION NO.
THE T]NIFORM CTISTOMS AIiID PRACTICE FOR
NTVTSTOTS) ]NTERNATIONAIJ CHAMBER OF
500.
UNLESSOTHERWISESTATED,ALLDOCT'MENTSARETOBEFORWARDEDTO;;lt MArL, oR HAND DELTvERED To ouR couNTERs'
NC 12t15 MUL (5-91-7W71)
*** COIIT']NUED ON NEXT PAGE ***
ff(nfEsrA/qivr(saaatffat/J
PAGE 2
DOCUMENTS ARE TO BE DIRECfED TO: OKE BUILDING,
NoRwEsr B.ANK MrNN;loia, NATlgryll-AssocrATroNt RoANt
FrFrH Fl,ooR, l-09 ;ourH'?TH sTREET'*;iNNEAPor''is' MN s5479 ATEN:
TNTERNATToNAJ, PRo;;&--seRvrcEs' LiTTERS oF cREDrr' MAc
N9312-051.
OR
NoRWEST BANK rMrERNATroNAr,, 633 17TH srREET, 3RD Fl,ooR, DEIr{\IER'
lo^'ii6zozl-aT'rt{' IETTER oF cREDrr DEPT'
CAbICELLATION OF LETfER OF CREDIT PRIOR TO EXPIRATION: THIS
I.,ETTER OF CREDIT.IANI AIAMAOUNTTS.'.-i;-A}-IY) MUST BE RETURNED TO
US FOR CANCEI-,I,ATIOii'Wrrrr A STATEMdi PUNbONTUOLY SIGNED BY THE
BENEFICIARY StEtii<i T',,^;t iTTN I-,ETTER OF CREDIT IS NO I-,ONGER
REQUIRED AND IS E.;iNC RETURNED TO THE ISSUING BAI\TK FOR
CANCEI-,LATION.
WE HEREBY ENGAGE WITH BENEFICIARY THAT DOCTJMENTS DRAWN
IN ACCORDA}ICE WIT; ;iiTS-iETTTR OF CREDIT WII.,L BE DI'I,Y
iowonno uPoN PRESENTATToN'
ouR REF. NO. s407365
AUTHORIZED
TA, NATIONAI-,
AIIfHORIZED S IGNATT'RE
NC 121.5 MUL (*91-m171t
,fdfE &ANKSttantJ!fa
NORWEST BAI{K MINNESOTA, NATIONAI-' ASSOCIATION
ATTN: I,ETTERS OF CREDIT,
ROANOKE BUII,DING, FIFTII FIJOOR
109 SOIITH 7TH ST.,
MINNEAPOLIS, MN 55402
TEI-,EX NUMBER: 6734665 SWIFT ADDRESS: NWNBUS44
TMPORTS/EXPORTS 1- 800 -5s3 -3759
.TANUARY 04, 2OOO
TO:
TOWN OF VAIL
75 SOUTH FRONTAGE ROAD
VAIL, CO 8L657
ACCOI]NT PARTY:
COHEN CONSTRUCTION
SIIAPER RESIDENCE REMODEI.,
P.O. BO X1-889
EDWARDS, CO 81632
WEOPENIRREVOCABLESTANDBYI.'ETTEROFCREDITNUMBERS4OT3S5IN
THE AMOUNT oF l-o,ooo.oo usD ( TEN THOUSAND AND 00/100 u's'
DOI,IARS)
IN FAVOR OF YOURSEI-,VES
EXPIRES APRIL 01, 2OOO AT OTIR COTJIiI1TERS
THISIsACI,EAT{LETTERoFCREDITAVAILABLEAGAINSTDRAFTSDRAI^IN
AT SIGHT oN NoRwEsT BA}ilK MINNESoTA, NATIoNAI, AsSo-cIATIoN,
MINNEAPoLIS,MINNESoTABEARINGTHEcI.,AUsE:|'DRAWNUNDERSTANDBY
LETTERoFCREDITNT]MBERs40T3S5oFNoRwEsTBANKMINNESoTA'
NATIONAL ASSOCIATION"'
THE COUNTERS OF NORWEST BA}TK MINNESOTA.PAYMENT WII,I, BE MADE AT
NATIONAI-, ASSOCIATION.
T'HIS CREDIT IS SUB.]ECT TO
DOCUMENTARY CREDITS (l-993
COMMERCE PI'BI.,ICATION NO.
THE IJNIFORM CUSTOMS A}iID PRACTICE FOR
REVISION) INTERNATIONAJ-, CHAMBER OF
s00.
I]NLEssoTHERWISESTATED,AI-.LDoct]MENTsAREToBEFoRWARDEDTo
US BY MAIL, OR HAND DEI,IVERED TO OUR COI'NTERS'
NC 42115 MUL 1541-70474)
*** CONTINUIED ON NEXT PAGE ***
tfraf
WES&4NKSttfftaartf
ouR REF. NO. s407355
AUTHORIZED TI'RE
TA, NATTONAT., ASSOC
PAGE 2
DOCI]MENTS ARE TO BE DIRECTED TO:
NoRwEsTBANKMINNESoT.A',NATIoNAI,AssocIATIoN,RoAI{oKEBUII.DING,
FIFTH FLOOR, 1-09 SOIIfH 7TH STREET, MINNEAPOLIS' MN 55479 ATTN:
rt.ltsRNatroNAl.J PRoDUCT sERvIcEs, LETTERS oF CREDIT, MAc
N9312-051.
OR
NORWESTBANKINIERNATIONAL,633I-?THSTREET'3RDFI-'OOR'DENVER'
CO 80202, ATTN: LETTER OF CREDIT DEPT'
CAIICELLATIoNoFI,ETTERoFCREDITPRIoRToEXPIRATIoN:THIS
I,ETTER OF CREDIT (AI{D AMENDMENTS, IF AI{Y) MUST BE RETURNED TO
US FOR CA}ICELLATION WTTH A STATEMENT PURPORTEDIJY SIGNED BY rIlHE
BENEFICIARYSTATINGTIIATTHEI.ETTERoFCREDITISNoI.oNGER
REQUIRED AND 1S BEING RETI'RNED TO THE ISSUING BANK FOR
CAIiICELI.,,ATION.
WE HEREBY ENGAGE WITH BENEFICIARY THAT DOCUMENTS DRAWN
IN ACCORDANCE W]TH THIS LETTER OF CREDIT WILI' BE DULY
HONORED T'PON PRESENTATION'
ATITHORIZED S IGNATI]RE
NC 42145 MUL (5-9tm474)
D4(O..lL*g. \i
-B(K e, Lo{-ro
75 South Frontage Road
Vail, Colorado 81657
970-479-2120
Finance Department
Fr6E t4
AREA r JFI{
FAX970-479-2157
REPTI3l TOIIII OF VAIL, COLORADO
Lztztt1999 67157 REOUESTS - I}{SPECTil tlORK SHEETS FOR:ll/2ll1999
Actlvtty: 1199-0078 I2/2L/19 Type: B-llECH Stetue: ISSUED Conetr: ASFR
Addreee: 2645 EALD l{0uilTr1}t RB
Locatlon: 2645 Beld llountaln Rd
Parcelr 2l0l-034-01-027 Oe,c:Uee :
Deeer'lptlonr llechanj.cel for Radlant Panel Heatlng SyetenApplleantr C0LOftAD0 PLUI|EII{6 gERyICE, I[C. Fhoner g?0-6tE-0?64
Ovnerr SHAPER STEVE phoner
fisntr'Ectar'r 00LORADE PLUHBil{G sERvrcE, illc. phone: 970-621-0764
Irrepectlon iequeat
Fequaatorr l(elth
Inforrnstlon. . . .
Fy'rney
uente I
Inepeeted.
Phone: 904-5338
Aetlon Commente Tlne Exp
Inepectlon Hlatory.....Itenr 00200 HECH-Rouqh
68129199 Inepector: CD
LA/L1199 Inepector: CD
Iter: 00310 IIECH-Heatlng
Actlon: PA SEE llOTE
IIoteEI E VEI{T AND BATH VEIITILATIOII APPROVED
COIIAIR COHFIGURATIO}I IIOT APPROVED. THE BOILER IS I}I AII A8
OF CDIIFIIIED EPACE III UIIUSUALLY T16HT COI{ETRUCTIOII IIHICH
REBUIRES CO}IAIR TO BE OBTAII{ED FROII THE OUTSIDE. COIIAIB
CAN IIOT BE OBTAIIIED FROI{ THE GARAEE
OAIOTl9S Inapector: CD Actlonr APPR COtliIR DUCTS
Itenl 00240 PLtIB-Gae Plplng
Actionr APPR l0fpt for 15 nln
heat nslna and anornelt
Itenr
Itenr
Iten l
Itern r
Loll5nq Inepeator'r fft Acttonr APPR
HoteEl heat msine teeted 52* pt
enornelt nalne 58*pt
driveray and alte enosnelt teetad at 80fpt
OO32O IfECH-Exheuet Hoode
00330 tIECH-Supply Alr
05346 IIECH-lllec.
O0390 IIECH-FinaI
T
1
REIATTAIICE COFY
"/4tu(-
r((ftJ.k:t
o
Design Review Action
TOWII OF VAIL
o
Form
Project Name: Shaper
Project Description: new garage
Owner, Address and Phone: Steve Shaper, 5251 Westheimer, Houston,TX 77056-5404
Architect/Contact, Address and Phone: The Resort Collaborative lnternational., 1000 S. Frontage Rd,
West #300. Vail CO 81657
Project Street Address: 2645 Bald Mountain Rd
Legal Description: Lot 10, 812, Vail Village l3th
Parcel Number: Building Name:
Comments:
Project# PRI99-0031
Motion by:
Seconded by:
Vote:
Conditions:
Town Planner: JeffHunt
Date: 5-13-99
F:iEVERYONBDRB/APPROVAI"/99/Shaper
Board / StaffAction
Action: staff approval
DRB Fee Pre-Paid: 200.00
05/I2/Sg WED 09:17
{t'i,
F'AX 303 623 2262 PSA DENYER @ooe
t o uuimm
Ero6ao[ hioL htan r laiondo an cuenn lc
xiol*oo dc lo rqrro dr rcrnor del troodrz y
. iLhttdo ls hoburc nec.otio pq! ht 'iiu:bl(Y*l b carbr?G lo pd3ho tl.
Hqgo lqr rcpqrbr ndtfurioe babe & cortqr
iiggl. Oblengo cesoromicqlc y un png'do
Dlch{iqnsl d e! o qhr-nos dc uro vlgq o
Lhin clanrnto rirudurd.
C6bcrr lirbncr dr caoyo 9qrg que el lfdgo.
luz de& ped{octord'tJfiii o lo irAirm.-
ft€rroir: hiblles br lhbour en rarldsd b
rorltLn de h ruinuc & rllhce du'nitr de
lumiile Gt le neterisl dc fiolbn irrlGdcur, ct
lolrrc vn.icort { lelftonco odiquot lcouper
tronrrrrrdes. p- 21.
A$ur.re,r!-Ju lerflcn n6ccrrgirc svar* ilc
couo"t lrt <h.vrons; precun*.eul hs conseilr
Arrurrz+r,u du :crrrlLn rdcanrrire g\'trs dc
couo"r l"r ch.wons; prectrt*r.9ul t66 conic
et l; phnr d'un lpeiiolice gua d! coupar
lrr kincr el plr d un chevron-
tnOoll iqct rohe6 ek. os neceisory lo Lllp
rkvllghl od.quahb rupponrd by dre rcof.'
lnrtqllez des crponno ou oulE cho5e dJ
brroin- afin ouc' h ouiE dc lumiL sdlbcsctn, qfin qui lc puir dc lomi
suiourr b'ran 'sorrcriu oc le tuitouiours bian 'sotlcliu par
.'") tlriF
PLruring
igr.rritri: lgegiur de qte lo mlh dd noted
ad rqql en d luLo lidp v lq .qto dd 't-o'|c 'e F.rdF ltl. !d d.aqlLr dtnethq b FAidel
d. h bdrE d &'w', cl dcnolr robc d errco
Epqulrror y b ffiedfn dc lo boneo dc vupor ccn
h'lgrulc d€l Iq** l2l. !q dirFnci. onll! .l l*o
irnbr y el oirlcnrlsr*i i|rh lr dc l2' ll5 lral
on lod* hr purts Pl-
ir,rh|..... tqlhi un linl abndx a frrhal a0 la
.rlqt&hl & ftiFcn t!io** h ,qir{!. d. xrdq€o .t
L phl"od ll! lrr #Hh lrootqt L dF ch Plde
&-lo roroitnd|.. <! di.iv.t d. duie at d'un
pqrevsar ar lo nlnrre * ru cce l2). te di*a|,
<e rnm lo pfn a l'h.kdlen dc ehc+ r/f
(15 rul porout {31.
tilrA'l5ffii
.lz
O5/I2/SS WED 09:16 !'AX 303 823 2282 PSA DENVER
G 001PSA DENVER
THI RE$ORT DESIO
COLLABORATIVI
INTERNATIONTL
06/L2/99 WED
H
DATB
09:15 FAX 303 623 2262
?s<
FAcsTMILE TRANlrrral
rcBMMB
PAGE!(hMbqi*rwtut)
nN(*
COMPAIITY:
moilft
IA
RB
FAt(*
MEMO:
pl€Gc cortact lhe abow srrdcr st lbc numbct bdow if t|Grc dc sny qursiotls lrgrrding lhis fa|smission.
This fqimilc is inicadcd only for tlre rddrcssr. aod nsy contrin idomalion lllar b privik#d ind cosfidcntial. If thc rtadcr of this mcsrrgc is
not rhr inrrnded rccipieot, you ac trcreby notfiod trrr my Oisssntnarior, rtistribution or coPying of &is communicdior is srrictly ptohibiEd. lf
you hrve rcccincd dris rbmhnnication h amr, plctsc notiry rF imnrodidrly at thc numbcr bclow o anangc its rctum. Thmk you.
The Resat Dedgn
plms
VAIL
Colbcr*iw lrrdlmtr ftc 303 68 %2
e 1617 Wmc SrE{, SuiF
crmit infr@ewt&ipcom
DENVER
r Denrrer. @ 8[E@
tA/Amrt$,resoddes'ipcotn
SA].r FRANCTSCO
a
a
P.C.
I
FRISCO
REV1SED 5/6/99 {tvruDESIGN REVIEW BOABD FIMLAGENDA
Wednesday, llay 5, 1999
3:00 P.M.
PUBLIC MEETING SCHEDULE
11O0 pm
2:00 pm
pFoJEcr oRTENTATIoN / LUNcH- Town Couttcil Chambers
MEMBERS ABSENT
Bill Pierce (left at 5:00 p.m.)
Hans Woldrich
Melissa Greenauer
Tom Weber (PEC)
SITE VISITS
1.
2.
3.
4.
5.
o,
7.
8.
L
10.
11.
Driver:
Vail lnterfaith Chapel- 19 Vail Road
Waterhouse - 285 Forest Road
Adams - 765 West Forest Road
Dobson lce Arena - 321 E. Lionshead Circle
Scalise - 2567 Arosa Drive
Lot 25 - 1854 Glacier Ct.
Wiley- 1538 Spring Hill Lane
Valleau - 4839 Meadow Drive
Shaper-26,15 Bald Mountain Road
Lot 4. Gore Creek Sub. - 51 66 Black Gore Drive
Kinzelberg - Lot 4, Spraddle Creek Estates
George
MEMBERS PRESENT
Clark Brittain
PUBLTC HEARTNG - TOWl.r COUNCTLCHAMBERS
1. The Marriott (Lionshead) - Conceptual review of a major exterior alteration
and construction of a new interval ownership club.
715 W. Lionshead Circle / Marriotl Mark, Morcus Subdivision
Applicant: HMC Corporation, represented by East-West Partners and Gwathmey-Pratt
CONCEPTUAL_NO VOTE
2. Lionsquare North - New awning.
660 West Lionshead CircleiLot 8, Vail Lionshead Isr.
Applicant: LionsquareNorthCondoAssociation
MOTION: BillPierce SECOND: Hans Woldrich VOTE:5-0
3:00 pm
George
Dominic
CONSENT APPROVED - Subject to final staff review.
REVTSED 5/6/993. Adam residence - Conceptual review oi a proposed remodel. Brent
765 West Forest Road/Lot 8, Block 2, Vail Village 6'n.
Applicant: Nancy Adam, represented by Fritzlen, Pierce, Smith
CONCEPTUAL-NO VOTE
4. Henkes residence - Final review of a new primary/secondary residence. Allison
2824 Snowberry Drive I Lot 17, Block 9, lntermountain.
Applicant: Andrew Henkes
MOTION: Bill Pierce SECOND: Hans Woldrich VOTE: 5-0
CONSENT APPROVED
5. Wiley residence - Conceptual review for a new primary residence and Type ll Allison
employee housing unit.
1538 Spring Hill Lane/Lot 14, Block 3, Vail Village First Filing.
Applicant: WileyFamilyPartnership
CONCEPTUAL.NO VOTE
6. Valleau Residence - Conceptual review of a remodel/addition to an existing residence. Allison
4839 Meadow Drive/Lot 17, Block 5, Bighorn Fifth.
Applicant: Bob & Kathy Valleau
MOTION: Bill Pierce SECOND: Hans Woldrich VOTE: 5-0
CONSENT APPHOVED
Scalise Residence - Conceptual review of a new primaryisecondary residence.
2567 Arosa Dr./Lot 9, Block E. Vail Das Schone 1"'
Allison
Applicant: Dennis Scalise
CONCEPTUAL-NO VOTE
Jetf8. Waterhouse residence - New garage.
285 Forest Road/Lot 20, Block 7, Vail Village 1"'.
Applicant: Steve & Linda Waterhouse, represented by Steven Riden
CONCEPTUAL _ NO VOTE
9. Shaper residence - Review of a new garage. , Jeff
2645 Bald Mountain Road/Lot 10, Block 2, Vail Village 1$".
Applicant: Steve Shaper
MOTION: Bill Pierce SECOND: Hans Woldrich VOTE: 5-0
TABLED UNTIL MAY 19, 1999
10. Vail Interfaith Chapel - Remodel/addition at existing facility. Jeff
19 Vail Road / Lot J, Block 7, Vail Village First Filing.
Applicant: Vail Religious Foundation, represented by Victor Mark Donaldson Architects
MOTION: BillPierce SECOND: Hans Woldrich VOTE:5-0
TABLED UNTIL MAY 19. 1999
7.
REVTSED 5/6/9911. Kinzelberg residence - Conceptual review. Jeff
Lot 4, Spraddle Creek Estates.
Applicant: Harvey Kinzelberg, represented by Hans Berglund
CONCEPTUAL- NO VOTE
12. Grand Traverse Lot 16 - Final review of a new single-family residence. George
1800 Lionsridge Loop / Lot 16, Dauphinais-Moseley Subdivision.Applicant: Dauphinais-Moseley Construction
MOTION: Melissa Greenauer SECOND:Tom Weber VOTE:4-0
APPROVED PER REVISED PI.ANS
13. Lot 25, Glacier Ct- - Conceptual review of a proposed new primary/secondary residence. George
1854 Glacier Ct./Lot 25, Block 2, Lionsridge #3.Applicant: Pat Dauphinais
CONCEPTUAL-NO VOTE
14. Westhaven Club & Lodge - Final review of a proposed new Fractional Fee Club George
and employee housing project.
1325 Westhaven Dr., Westhaven Condominiumsi Cascade Village Area A.
Applicant: Gerald L, Wurhmann, represented by Robby Flobinson
MOTION: Bill Pierce SECOND:Hans Woldrich VOTE:5-0
GONSENT APPRO\IED
15. Dobson lce Arena - Conceptual review locker room/loading dock expansion. George
321 E. Lionshead Circle/Lot 1, Block 1, Vail Lionshead 2no Filing.
Applicant: Vail Recreation District, represented by Odell Architects
CONCEPTUAL_NO VOTE
16. Lot 4, Gore Creek Subdivision.- Conceptual review ol a new primaryisecondary residence.George
5166 Black Gore Drive/Lot 4, Gore Creek Subdivision.
Applicant: Greg Amsden
CONCEPTUAL-NO VOTE
Statf Aoorovals
Brooktree Condominiums - Stairway/landing replacement. Brent
980 Vail View Drive/A portion of Block B, Lions Ridge Filing 1.
Applicant: BrooktreeTownhomesHOA
Burillo residence / Northwind development - Revised landscape plan. Brent
365 Mill Creek Circle/Lot 1 6, Block 1 , Vail Village 1"' Filing.
Applicant: Northwind Development
Rizk residence - Bedroom/dining room addition.Brent
740 Sandy Lane/Lot 4, Block 2, Potato Patch Filing #2.
Applicant: Oscar Rizk
o
REVTSED 5/6/99
Axelrod residence - Exterior repaint. George
2578 Arosa Drive/Lot 1, Block C, Vail das Schone #1.
Applicant: Art Axelrod
Ketcham residence - changes to driveway. Allison
4i101 Glen Falls Lane/Lot 1, Forest Glen.
Applicant Linda Ketcham
Berndt residence - Site plan changes. Allison
756 Potato Patch/Lot 4, Block 2, Potato Patch.
Applicant: Wolfgang Bemdt
Maclean residence - Interior conversion of crawl space. George
1330 Sandstone Drive, Overlook, Unit #1?G-4, Vail Lionsridge.
Applicant: John Maclean
Walzer residence - Addion of stone veneer to deck rail and chimney. George
333 Beaver Dam Road/Lot 41, Block 7, Vail Village lst.
Applicant: George Schaeffer Construction Co.
Timber Falls Building #18 - North side deck extension. Brent
i1459 Timberfalls Ct. #1 8/Timberf alls Condominiums.
Applicant: Timber Falls Phase lX Association
The applications and information about the proposals are available for public inspection during regular otfice
hours in the project planner's office, located at the Town of Vail Community Development Department, 75
South Frontage Road.
Sign language interpretation available upon request with 24 hour notification. Please call479-2356,
Telephone for the Hearing lmpaired, for intormation.
o
FttE C0pi
DESIGN REVIEW BOARD FINAL AGENDA
Wednesday, March 17, 1999
3:fi) P.M.
PUBUC ilEETING SCHEDULE
PRAJECT ORIENTATION / LUNCH - Community Development D€partment 11:30 pm
tl Discussion of development ol A-Frame site located at Lot 8, Block C, Vail Ridge
MEMBERS PRESENT METTIBERS ABSENT
Brent Alm
Hans Woldrich
Bill Pierce
SITE VISITS
1. Hoversten - 95 Forest Road2. Antlers-680 West Lionshead Place3. Marriott-714 Lionshead Circle4. Timber Falls -21469 Timber Falls Court5. Tall Pines - 2239 Chamonix Lane6. Bridge Street Building - 281 Bridge Street7. Shaper - 2645 Bald Mountain Road
8.Driver: George
1:30 pm
PUBUG HEARING - TOWN COUNCIL GHAMBEFS
1. Sonnenalp - New canopy on east side entry way. _
20 Vail Road/Part of Lot K, Block 5-E, Vail Village 1*.
Applicant: Johannes Faessler
MOTION: Hans Woldrich SECOND: BillPierce
3:00 pm
Brent
VOTE:3-0
APPROVED WITH 1 CONDITION:
1. That the relief panels on the wall adjacent to the canopy edge shall be painted to match.
2. Cummings residence - Final review of a new single-tamily residence Jetf
and Tlpe I employee housing unit,
1835 West Gore Creek Drive / Lot 20, Vail Village West 2"o Filing
Applicant: Greg and Janice Cummings
MOTION: BillPierce SECOND:HansWoldrich VOTE:3-0
CONSENT APPROVED WITH 3 GONDITIONS:
3.
4.
6.
7.
! - r. }-rs"I I
1. That the stonework around the windows ne)ft to the south side door be eliminated.2. That the windows be centered on the south side of the garage.3. That brackets be added to the south side deck.
Hoversten residence - Final review of a new primary/secondary residence. Jeff
95 Forest Road / Lot 32, Block 7, Vail Village First Filing,
Applicant: Philip Hoversten, represented by snowdon & Hopkins
CONCEPTUAL-NO VOTE
Leach residence - Final review of a single-family residence. Jetf
1390 Buffehr Creek RoacUEnvelope B, Parcel 4, Briar Patch #8.
Applicant: David & Jody Leach, represented by Ron Diehl
MOTION: BillPierce SECOND: Hans Woldrich VOTE: 3-0
CONSENT APPROVED W]TH 2 CONDITIONS:
That the exterior finish materials receive staff approval.
That a statf approved limits of disturbance fence be required.
1.
2.
-Conceptual review of new garage.
.in Road/Lot 10, Block 2, Vail Village 13"'.
Jetf
2645 Bald
Applicant:Steve Shaper
CONCEPTUAL- NO VOTE
Antle/s -Conceptual review of the establishment ol Special.Development District No. 36.Jetf
680 W. lionshead Place/ Lot 3, Block 1, Lionshead Third Filing.
Applicant: Antlers Condominium Association, represented by Robert LeVine
CONCEPTUAL-NO VOTE
MarriotUGore Creek Club -Conceptual review. George
714 Lionshead Circle / Maniott Mark.
Applicant: HMC Acquisition Properties, Inc., represented by East-West Partners
GONCEPTUAL-NO VOTE
8. Meadowbrook Condos - Conceptual review of an exterior remodel.
1933 Buffehr Creek RoacUlot 41. Buffehr Creek Subdivision.
Applicant:
MOTION: BillPierce
George
SECOND:HansWoldrich VOTE:3-0
CONSENT APPROVED WITH 2 CONDITIONS:
1. That the DRB recommends the new deck railing should appear similar to the existing
wood railing.2. That if stone around the base of the building is not an option, an alternate color ol stucco
with a relief band at the top be used and that this band be varied/broken in height from
exterior wall to exterior wall.
"J
I
9. McDonald's - Sign application. -, George
2111 N. Frontage Road/Lot 28, A resub of Lot 2, Vail das Schone 3'o.
Applicant: McDonald's
MOTION: Bill Pierce SECOND: Hans Woldrich VOTE:3-0
CONSETT APPROVED WITTI 1 CONDITION:
1. That the sign have a matte finish.
10. Bridge St. Building - Final reviewipaver replacement and snowmelt system for walkway. Dom
281 Bridge StreeVLots D, E, and F, Block 5C, Vail Village 1'' Filing.
Applicant: Mark Cadmus, Bridge Street Condo Association
MOTION: Bill Pierce SECOND: Hans Woldrich VOTE:3-0
GONSENT APPROVED WITH 6 CONDITIONS:
1. That they provide an 8" soldier course.2. That inigation be provided to planters and trees.3. That a new light fixture be provided in the planter at the north end on Bridge Street and
that the existing fixture be relocated to the planter on the south end of the property.4. That the paver color match the blend used at lhe Austria Haus in a hening bone
configuration.5. That the flue vent detail be approved bystaff.6. That the tree species be worked out with staff.
11. Tall Pines - Conceptual review of 2 duplex structures. Dom
2239 Chamonix Lane/Lots 1&2, Tall Pines Subdivision.
Applicant: Paint Brush - Tall Pines G.P., represented by Kurt Davis
TABLED
12. Timber Falls Building #19 - Conceptual review ol a new 6-plex. Dom
4469 Timber Falls CourUUnplatted.
Applicant: Greg Amsden
TABLED
13. Glen Lyon Office Building - Conceptual review. Dom
1000 S. Frontage Road,WesVlot 54, Glen Lyon Subdivision.
Applicant: Glen Lyon Office Building Partnership, represented by Kurt Segerberg
CONGEPTUAL-NO VOTE
Statf Approvals
Bakalar residence - Minor revision to previously approved plans. Brent
780 Potato Patch Drive/Lot 17, Block 1, Vail Potato Patch.
Applicant: John & Christine Bakalar
L
TOV Community Development Dept. - Remove garage doors and replace with windows. Dominic
111 S. Frontage Road
Applicant: Town of Vail
Golden Peak Ski Base - Window frame addition. Brent
458 Vail Valley Drive/A portion of Tract F, Vail Village sft fiting.
Applicant: Vail Associates
Tutog - Loft addition. George
22 West Meadow Drive #3021/illa Cortina
Applicantr Robert Tutag
Axelrod residence - New garage addition with storage. Dominic
2578 Arosa Drive/Lot 1, Block C, Vail das Schone #1.
Applicant: Arthur and Judith Axelrod
Bowen residence - Re-sidino of 2nd tloor ol house. Allison
5047 Main Gore Drive/Lot t,'Block 1, Bighorn Sth.
Applicant: Peter G. Bowen
Jewels of the West - Sign-wall. Jeff
225 Wall StreeVBlock C, Vail Village t"t.
Applicant: Bob Akkad
Goolsbee residence - Deck extension. Brent
1 450 Lionsridge Loop/Lot 23 Dauphinais-Moseley Subdivision.
Applicant: Charles & Carol Goolsbee
Higuera residence - Porch enclosure. Brent
1 406 Moraine Drive/Lot 3, Dauphiais-Moseley Subdivision.
Dr. Gilbert & Margaret Higuera
Mitchell residence - Addition of exterior stairs. Brent
1799 Siena TraiUlot 18, VailVillage West Filing #1.Applicant Mr. Mitchell
The applications and information about the proposals are available for public inspection during regular
otfice hours in the poect planner's otfice, located at the Town of Vail Community Development
Department, 75 South Frontage Road.
Sign language interpretation available upon request with 24 hour notification. Please call 479-2356,
Telephone for the Hearing lmpaired, for information.
v
FILE COPY
TOWN OFVAIL
Department of Community Development
75 South Frontage Road
Vail, Colorado 81657
970-479-2r38
FAX 970-479-2452
March 18, 1999
Namita Khanna
Resort Design Collaborative
1000 South Frontage Road West #300
Vail" CO 81657
Re:New garage at Lot 10, Vail Village l3th;2645 Bald Mountain Road
DearNamita:
The building plans that were submitted for the garage have been reviewed by the Desigrr Review
Board. The following issues have been noted. Generally, these issues need to be addressed at
least l0 days prior to any Design Review Board (DRB) meeting in order to be scheduled for the
meeting. The next DRB meetings are scheduled for April 7th and 2lst.
A roof needs to be over the spa./hot tub. The roof should connect the garage with the residence.
The materials, trim and details for the addition should mimic those of the residence, although the
style does not have to match.
Attached are the comments from the Public Works Departrnent.
A stamped survey of the site needs to be submitted. Additional cornments may be forwarded
once the survey is submitted.
Please feel free to contact me at 970-479-2140 to discuss the project.
Sincerely,
Senior Planner
{p*or *,
Communlty Development P.lrn Routtng Form
Approved _x_Denied (cite detailed reasohs)Approved with conditions
Routed To:Greg: Hail, Pdbti.lfr ;;kJ
Return To:JeffHunt
Date Routed:3n2t99
Return By;ASAP
Project Name:
Project Address:
Project Legal:
Project Description:
Shaper
2645 Balcl Mountain Road
Lot 10, Block 2, Vail Viltage 13'h
New garage
Provide Stamped Suwey and Title Roport
What are the Elevations of garage, driveway and street. Show on site plan
Max driveway width is 48' Please adjust and revise
Provide sight distance lines of 15' behind 4' pan for 125' to the East and 15' x 150' to the West. This requires
a signifrcant regrading ol the oomer lot. Vegetation gr€ater than 3' will not be allowed. Once the suwey ofthe
whole lot and edge ofroad is provided, the Town ofVail Engineering Departrnent will be able to more accurately
show the necessary grading required,
4' concrete pan cannot be heated and any heated driveway within Town of Vail right ofway must be in siparate
zone.
A Revocable Right of Way Permit will ueed to sign by the Owners of the property
Reviewed by: Leonard & Greg H Date reviewed: 3-12-99
t
DevCommunitv elopment Plan Routing Form
Approved Denied (cite detailed reasons)Approved with conditions
2
?
Routed To:Greg Hall, Public Works
Return To:Jeff Hunt
Date Routed:3^2t99
Return By:ASAP
Project Name:
Project Address:
Project Legal:
Project Description:
Shaper
2645 Bald Mountain Road
Lot 10, Block 2, Vail Village 13"'
New garage
Provide Stamped Survcy and Title Report
What are the Elevations of garage, driveway and street. Show on site plan
Max driveway width is 48' Please adjust and revise corl*o -[t*t
whole lot and edge of road is provided, the Town of Vail Engineering Departrnent will be able to more accurately
show the necessary grading required.
4' concrete pan cannot be heated and any heated driveway within Town of Vail right of way must be in separate
zone.
A Revocable Right of Way Permit will need to sign by the Owners of the property
2: I grade max on all disturbed areas
Date received:
Reviewed by: Leonard & Greg H Date reviewed 3-12-99
u 9z? 51,1-ql E0E 1?,,"!!',,O / EdOlrl
rt
PROPOSED LANDSCAPING
Botanical Namc Common Namc Ouantity Sizc'
pROpOSEDTREE5 Picea punsens Colorado spruce 10 8'-10'
AND SHRUBS:
Colorado spruce 5 8,
Colorado spruce 3 4'- 6'
EXISTTNG TREES TO
BE REMOVED:
'Minimunr rcquircmcnts for landscaping: dcciduous trccs - 2 inch calipcr
- :ilf:'*'*' -u,fr1,[1"'"
Tvnc Sguarc Footagg
CRO1NDCOVER U.tt". p.r.""i.f" I
SOD
Blue grass 2,500 +/-
SEED
IRRIGATION
TYPEORMETHODOF
EROSION CONTROL
all areas
OTHER IANDSCAPE FEATURES (rceining'walls, fcnccs, swimming pools, ctc.) Pleasc sPccif. Indicatc top and
bottom clcvations of rctaining walls. li,taximum hcight of wdts within thc front saback is 3 fccL Mocimum bcight of
walls clscv/hcrc on thc propcrty is 6 fecl
Wall attaching existing structure and extension.
Spa as shown on plan.
MAR-63-9g 17, @@ FRoM. LAND TrrrjcuARANTEE uArL rD: 3o3 4?+34
OI,D REPUBI,IC NATIONAL TITLE INSURI\NCE COMPANY
ALTA COMMITMENT
SCITEDULE A
Our Order # VTF25507]
PAGE
h.J*+-^..#
Yh-'a Ar-r-.--€
z?#
- Cha
--TOTAL--
Effeccive DaEe:
rT* THIS IS NOT N{ IN'OICE, BUT AI{ ESTIMATE OF FEES. WTIEN REFERRING
TO THIS ORDER, PLEASE iETSNNNCE OI'R. ORDER NO. WF255073 TiT
<a:Fr<\-_-
e9"
Z4'eZ For Information onIY
aE 5:00 P.M'
described or
is:
referred to in3,The eBEaEe or inEereEt in the }and
this CommitmenE and covered herein
A Fee Siq)Ie
4. TiEle to Ehe estate or inEeresb covered herein is at Ehe
effecEive daEe hereof vested j.n:
ffi. €i--J $1+r1e#-
to in this CotilnitmenE is deecribed
+sv
5r-ras
€, L.
,S'srff?*-
5.Tlee Iaud referred
f ollotls r
LoT 10, BLocK 2, VAII, VILLAGE THIRaEENTIi FILING AccoRDINc To
THE RECORDED PIAT fltennOf, COU$rY OF EAGLE' STATE OF COTORADO'
z/,e-lan
PAGE
MAR-s3-ss r7,06 FROM, LAND Trf GUARANTEE vAIL ID:3O3 4"/'s34 PAGE
A I.,'I' A (-: O M M I'I' M II N T
S;(:HUDULL] N -:2
( Hx( j r,rp L. i o 11.,.-i )Our Orde:: l+ V't'F;lrrrr0'/ 1
'I'frr-: poi i r:y nr. [)(-)l. i(:ir..rt; l.t) he i.ssrred wil..J. conl;.tiIl e\xcepL j.orts t.0 t'.hn
t'(J1 "l.owi.lrc1 urt.l r:)iiri l lrL,+ r,;;rrne ;.rr-cl (lispr>sed of f-() tirc gati $f acf.'i rlrt of:
t. Lr(r C()rnllo"t r) y :
.l , lit:;.rrxl.rl'cl 1{y,r.:r:l'rl" ir''rnsl I F-hror.rtyh 5 prrntecl oti t-ito covrlr: fi}tfrtirf..
{; . 'firx(:t.; ,.rnd ;l!;r.';ur.:r;rn(+rlf.l.; Tr()t. ycL clue or' !)ayitble and speci.ill
flJjsi{;rtiLinli+ l":fi ()t: ye:t: cerL.:i. l,:i.ed. t,o L}rr.r 'I'rcctcurer' i] QEf ic:c.
'l . Arry rttlF).i icl I xr=rfl ()l- .tsi:irlririrl\(jrlL $ againnr. unid .l.and,
B . Iri Ern!i I.clr rrrri.i,..r.i.cl wil[.ttr and siewer chargefi, if arry.
R.I(il11'Olr [)lt0Fl{..Lll'1 O1t OF A VETN OR LC)lJLi TO nXTRAC'| /\NlJ RIIMOVII: IIIS ()lil]
THLlH,lrlh'R()M 5il()Ltl,l) TIIn S;AMF: tsE L'OUND TO PFINEI'RI'TE OR fNTIIR.SnC'r'THl'i pltl:MISIIS
AS Irli:l"lFlllVF:ft tN t,NI'I'tjD S'f'A'I'LjS PATF:Irr HHCOI{.DED May 06/ 1.(J0li, lN L}OOK 4B A"l'
PA(:;ti: r)0().
,IU. R,t(.itI,I 0IJ WNY }.'OI{ IJ,I'T'CIIUS OR CANALS CONS'IF.UCTHD BY'I'HE NU'I'}NF.I'IY OF''I'HL;
UNI',t'iril) I.i'fA'l't:ji{j l\L-j lr.nsIiR\/FlD 1.N IJNI'IED STATFIIi FATEN'I'RECORDED May (}(; , 1.u01;, TN
BOt)K 4lJ A.1' t'lAlill ':;09.
t. 1.. B.F:ti't'1{1il't't.vtrt ('()vuNANTS, wT.IT(.:H Do NO'T',CONTATN A FoRl'l:I'l'Utild oI?- R.nvntt'l'h:lt
(:LAt[.j1.!: , [rtr]'()MTT"l'TN(+ RI..:f;'l'RIC']'IONS, TF ANY, I]ASED ON RACFI , (lol,oR, tl.l1l1,l.(:l IoN,
oR N/\'rIoNn t, ot{,t.(,.lIN, A,r-i coNTATNFi]l tN INSTRUMBNT REC()H.L)EL) 0<;rl;()i')r:rr.' 0ll , l.')'t ),
TN LIOOK l,lt! A't"' L'AC;u :1.46 ANI) nS AMENnED TN INS'IRUMENT RIICORDF)D lieJrt"r..'rilLrr."rr il l,
1(r'ltl , IN lr(.)t)K :t'71; A1' Ern{+E 62 B .
).?.. FAlittMl,lN'l,';(i, RtitinRVA'l'IONS ANII I{EIS'I'RICTIONf-l ASj SHOWN OR F'.DSERVI:ID ON '.ftlt'i
RUC'OHI)ILI) I't,IfI' (.)I.' VAI T, VILLATJE TI.ITR.TF]FN'I'H I'ILING,
l.'A(.il,.l
THE RESORT
COttABOR
I]'ITERNAT
Date Receivet
llAR 08 p99
DATE
.JOB NAME
JoB No.
I J SHOP T)RAV\,.INGS
TRAN S MITTALDESIGN
ATIVE
IONAL
\T'E ARE SENDING VIA
,bdrrecrru't
N ORIGINALS
N LjNDER SEPAR{TE CO\,ER
N coPY oF I,ETTF,R
COPIES DAI'E DESCRIPTION
zlslT)Ailh . o/a^n rfunA 4 %yaoht*",<lt I
I Etf/az - U/dafu,4, B
/ffitd lm/ar
I oHe '{nahlfufu v
l6l? Wazee Slreet, Suite C2. Denver, C0 80202 l^xt 303.623.2262phone; 303.623.3355
l R I S( O t)uNvttR
in fo@ resortde s r gn. co m
sAI FRANCISCO
f.'e
TO:
FBOM:
DATE:
SUBJECT:
Vail Town Council
Communily Development
December2, 1997
Modification of high debris flow hazard designation tor 2il5 Bald Mt. RoadAot
10, Block 2, Vail Village 13th Filing.
Staff: Russ Forrest
1. PURPOSE
The purpose of this worksession is to consider a request to modify the high debris flow hazard
designation lor 2645 Bald Mt. Road/Lot 10, Block 2, Vail Village 13th Filing. Ms. Nott, the
property owner, is requesting this change as the result of mitigation lhat was constructed north ot
her home on Tract C, Vail Village 13lh Filing in 1984 (Attachment 1: Photos of berm).
2. BACKGROUND
In May of 1984, the Town of Vail experienced approximately 40 debris flow incidents, of which
several were localed in lhe Bald Mountain neighborhood. The property in question did
experience a debris flow at that time. Atter the first incident in 1984, the properly owner crealed
a diversion channel approximately l2leet deep and two berms to mitigate future debris llow
events. The applicant has provided additional background inlormation for this requesl which is
included in attachment 2.
The middfe portion of the property is designated as a high debris flow hazard area and the rest
ol the lot is designated as a moderate debris flow hazard area as per the Town of Vail hazard
maps. Stan Berryman, who was the Town of Vail Public Works Director at the lime, wrote a
letter which stated that he feels that the berm "should effectively divert all but the most
catastrophic future mudflow events away from Ms. Nott's house (Attachment 3)."
Statl has met with Ms Nott, at her request, on several occasions to discuss how lhe existing
berms and ditch affect the hazard designalion on this lot. Slaff recommended to Ms Noft that a
qualified geologist do a site specific study of the lot to determine what if any hazard designation
should be placed on the propefi with the existence of the berms and ditches. Ms Nott engaged
the services of Nicholas Lampiris, who has done many geological studies in the Town of Vail, to
do a site speciftc geological study ot the property (Attachment 4). Mr. Lampiris concluded that
Ms Nott's home is "out of the Debris Flow Line because the line will follow the bottom of the
lrench to delineate the lower reaches of this hazard in lhis area." A map is provided with lhis
letter to delineale where the high debris flow hazard is located. This conclusion was supporled
by an engineering firm that Ms Nolt engaged to also review the geological hazards on the site
(See Attachment 5).
3. FECOMMENDATIONS
Town statf including the Town Engineer, Greg Hall, has revieured the letter lrom the Geologist
and finds that the letter is adequate to justily designating a portion of the property as having
'approved mitigation." Since the mitigation lor lhis hazard already exisls and no building
permits are required, the process for creating approved mitigabion involves the Vail Town
Council passing a motion that would modify the Town ol Vail Debris Flow maps to indicate
approved mitigation on a portion ot 26/,5 Bald Mt. Road. ll the Town Council would approve of
Ms Nott's request, an overlay would then be crealed, similar to what was done wilh the Booth
Falls Berm, to indicale that an area on her lot is protected by the berm. The map would also
have a notalion to reler readers to the letter from Mr. Lampiris and the site specific hazard map
prepared for lhis property sholtrn in attachment 4. Approved mitigation in this case, based on Mr
Lampiris's letter, means thal the existing home and the area south of lhe center line of the ditch
is "now out of lhe Debris Flow Line" and is no longer in a hazard area as long as the berm and
ditch are maintained. The area above (north) the center line of the ditch remains in its present
hazard designation.
Attachment I
Town of Vail Debris Flow Map
Moderate Hazard
High Hazaard
View of Ditch and Berm north of
2645 Bald Mt. Road
View of the backside of the berm
directly north of Ms Nott's home
Attachment 2
Additional Background Informrtion
from Ms Nott
OVERVIEW
Lot 10, Block2, Vail Village 13th Filing
BACKGROUND
Not until recently, when an application was tumed down for a local bank home equity loan due
to the fact their town maps include many properties in hazard zones, Lot l0 among them, did it
become appa"rent that the 1984 mitigation efforts to Lot 10 were not documented. Explaining the
situation to Senior Environmental Policy Planner, Mr. Russ Forrest, he assurred me that it is a
routine matter and town regulations are in place for such circumstances. (See attached map
examples.) Of significance here is a quote from Andy Knudson contained in the enclosed letter
stating tlrat a "high hazard" debris-flow designation on Vail's planning maps "was a very 'broad
brush' and not necessarily applicable to most of the mapped 1ots" (enclosure #l), It is significant
that this enclosed letter was submitted to the Community Development Department as part of an
application for a new two-story large home addition with a wooden foundation to be built ten feet
from Lot 10's westem property line -- both lots being in the same mapped hazard. zone. This
addition was recently approved without any special hazard zone building requirements -- in
effect adjusting the hazard-zone designation. Mr. Forrest explained that this was allowed
because effective mitigation was already in place on Lots l0 and 1 1 . These mitigation measures
are explained in enclosure #2.
Because I am not applying for a building addition, etc., the procedure for documenting effective
mitigation measures in order to adjust a portion of the existing hazwdzone on Lot l0 is different.
Council approval is required rather than Community Development and Design Review approval.
It should be made clear that the Town of Vail or any of its officers or employees hold no liability
for statements and/or decisions regarding hazard areas or geologically sensitive areas. (Please
see enclosue #3, Sec. 18.69.038 Disclaimer of Liability.) As we have spent a great deal of effort
and frrnds establishing effective mitigation berms and a new channel, it is appropriate to have the
hazad maps reflect these improvements and "clear" the building (home) and certain lower
portions of the lot from a "hazard" designation. The portion of the lot above the mitigation
channel will remain in the current designation. As the maps presently show, the house actually
appears not to be in a "high haznd zone" but because ofits grass (sod) roof, the aerial photos are
unclear. (It is stated in the Hazard Study Report that "hazard lines terminate at the uphill sides of
buildings; this indicates that flow energy will be absorbed by the building"). It is apparent from
studying the maps that most homes are not included in high hazard zones for this aforementioned
reason.
A Colorado licensed Consulting Geologist, Nicholas Lampiris, Ph.D., was hired to do a site-
specific study as required by Town of Vail zoning regulations. According to Town of Vail files,
Dr. Lampiris has executed many site-specific analyses for owners of properties in similar
geologically sensitive areas. A survey ofthe lot and new steam channel was done by Eagle
Valley Surveying Company. A revised hazard map for the lot was drawn by Mr. Richard
Benidge, licensed Landscape Architect and a former Vail area land planner. All professionals
contapted regarding Lot 10 support the effectivness of all mitigation measur€s presently in place
and concur with Dr. Lampiris' findings.
If you have any questions, please don't hesitate to contact myself or Dr. Lampiris.
v4bv
$r
5,*B
I $ $$F F xiI $ rdu: $ u"n
^d E* a
\,+:ilJu-i(,SJrN&$$[
N=n
I
$
fl
)-
n
c'lll Ixs'q\- \t, +LES
trrrsii9 q $ tx
irhll--s F A $io { f Flgq$:
.\\r;:n.'r" il d tiV d N'S d {o
II
:JFs
II
dD\Jg
lr\-
Ns
N{lltr
l+t\
L
)-
Fvn
t\
$$fis
J
t+
&
6
$F:
$t
.l
tr3
J$
$
N
4\
lt\
f,
1
,*
6
t-
F
s
s
a€q
l\
itts
N=
o
rLl_14
'll
.t1l
r'1.gI
:l
I;i
1l
ri'rl
!ij{
;l
_l
Ti.at
4
aIa4{t
,
,l
t
i
i
.--kr
.ENCLOSURE +1
4 / 4/96
i:H':: $:ti:"11"
RE: gspr1" H.rza:d for dupl€n ot
tlcar Hr. HauriolIol
E!{GINEERING & DESIGNT INC
sharpe/ PE
Eliuerrsur Ensi,13,1iT t Urr),,16*Tnjj{,:lr1. ccftcrtr, M? ler(.h,1fi.iiTj',:ftHi gi:lil
2625 Bqtd r,t{ru::taln Rd (cl&D Joh# 96{I3)
\
Per. the r.equeet cour septenber, ,;f"':::l:-llolr ttt'^ '-'
rne cuplex ,. ,o"li-inveetigJ[io,i'i! -:-":-E9t-Er:&'aarize:-T: lindinss or
It+*rE.rri iirili"l!0":1,'ii;iiiifi$iiil'i;!:iil"i.31["i'li",r"c."iii*.
i:iiii:l]\!:";, lt' I r y r o ffi ;: ;i" ;l.iiii
- ":llf; :"$:;."o0: tkf;_ ;:.*",;::F;,:'.*l*"*:1,, lff "ri!., i:ilrq:lii::it*"i:i' *l r.:iii:it*,
Tire !o'*a of v*{r's plannlng naps "13:g this rot to be in.,,hron;iilifr.fii:f 'il:i"I:a"".."'oui'i.3'.u". roi J.-*riil -til
p ran^ring"nioao-Ei;ir,,,*J,I,a ll;"1::l"llliii.l#l*;$.:Xigf:Ftr!1,:.;g;il ,".",The structure appear"g .rtlr tounded,, :re oo lndlcarionE of, founilationr:;:t:T: :5";::ri":ti.itt*i:i;Hi;{q"iiiCrylrl*qii,ilu=*,t'i*;"t,.
cignE of sL'ain o:..??:t.-cu,,rtru"tlor:-r,rovemsnt. No ingi."tlons of rockor other debrrs ddrrrage "u" nJi"i,'itr Tt nei.g$ois-r.ported none hasoecurred since the sLgustrrre,"-c6nltruction.
rhe dedatty ot rh€ A:ge{r-srovss near-th€ lop ano botton of the hi.IIappeers to rrr0icel.e lttrle roct* moisnrent hai o-d;";;;; rn thE ]as1:ccverar decacres' r'ika rany suuci'rigtor,s i"-t[i"-iir", too."ning ot theroilr in the mountoi..rropiu-i"iio-reeult in rnud or rock sri.des durinoirarriculoaly harvy_nolstur.c v*".1*; frui-tire-sf rpl i"fri"O thls duplexstrowscl no lndicarl.l. gl "ucit-"i;i* farrure, and 'sy rn racr De of rower$u$qeptrblr:,ty du€ to lrs trrgr: ro-ci content and souihern exposufe.
rt 1r thr opisi.on of thtB olfier t-hf,t thls Elfucture dorg not hrv. a11s-aijigrntrv_higher risk o! acbri; e""isl tf,i; fi; rn th. vair rrea,ancl that cn trdditts",l::tg1!y. aceigneo "iA construcieA per nortral uBC.guidartner Elrl nor rncrla'-tnr hirara to.oiiili-iiiiertv or rrrucru*r,or to publlc butrdtnga, rrghta*of-way, rordi, rtririi, irse&ant',utilitlas or trcllttle!.
1,la hope thls letter provitles LLe i'rrrrruaLion desired. ple.ase do nothesittte t(' corlLd,JL i.rs if wB mul. bs of further aegtstance,
Eve B. Nott
Enclosure #2
MITIGATION DESCRIPTION
In the spring of 1984, a small, seasonal, spring-fed underground stream on the east end oflot 10,
Block 2, l3th Filing flowed above ground and, after several days of rainy weather, overflowed
onto adjacent land and the street below. No damage was done to any structure or building. All
landscaping remained intact. During this time-frame, the owners, at their expense and under the
supervision of the Town of Vail's Public Works Department, constructed with the appropriate
healy equipment a large diversion channel extending the entire length ofthe lot. This new deep
channel adjacent and above the original stream bed has fully contained any and all subsequent
water flows. Additionally, high berms were constructed along the channel's banks to further
enlarge its volume and "carrying capacity". Stream flow volume has always been a fraction
(<l/20th to 1/100th) of the new channel's capactty. Another massive berm was constructed
along the western and northwestern lot lines and 20 larye blue spruce trees were planted for
further protection. These berms form a protective basin and barrier for any flash floodings, etc.
All these mitigation measures remain in place.
ENCLOSURE #3
r.q.rrz.uJo t nsctatmer of liability.This chapter .is based on "scientific and engineeringconsiderations which are .""ri"""'v - #;; '0.-"1[0.0.
Compliance with tir.-. prouirt;;- herein cannot insurefreedom from risk 10 lifi ;"i;i;';, property. This sectionshalt not create riabirity "; ,h;;";i of the Town of vail orany officer or employee thereoi for any damage that mayresult from reriance on this chapter, o. "ny administrativedecision lawfully made t.r.unA.r. The designation ofcertain areas as' hazard areas or georogica'y sensitive areas
,pj:::il,-1-o r"pr.incorporated into ttris section: ao., no,lmpry rn any way that areas nor so designated a;; f;;;;"*1I rir{ to life, salety or properry.(ord. 5(1e85) $ 4.)
f 8.69.036 Discteimer of tiabilifl
IAtCachnent 2
Pitkin County Public Worl<s
76 Service Center Road
Aspen, Colorado 8l 6l I
(970) 920 s390
Fax: (970) 920 5374
October 9, 1996
Mr. Russell Forrest
Community Development Department
Town of Vail
Via Fax: 970-479-2452
Dear Mr. Forrest,
I was employed as the Public Works/Transportation Director for the Town of
Vail in May of 1984 and was responsible for the deployment of Town resources during the
mudslides that occurred at that time. After the Bald Mountain nrudslide, Ms. Evie Nott
constructed a diversion channel above her house approximately l2 feet deep and a berm
approximately 25 feet in height as mitigation for future mudflow events. It is my opinion
that this structure should effectively divert all but the most catastrophic future mudflow
event away from Ms. Nott's house. Please call me if you have any questions or if you
desire anv aclditional information.
PBINT€O OtI
REGYCTEO P PEF
Sincerely,
Stan Berryman,bctor of Public Works
Attachment 4
Letter from Lampiris and Map
Couutt{s & l.rruPtnts
(ltNltll,TlN(l ( ili()l't rilsl s
P.O. Box 23
Sll,'I, Cu.oltnlx) 8 | 652
PlroNilF^x (9?0) tt76-5400 (24 l{ouRs)
,,,'.'Ttfrl*','r'u'
Ni.iolas l.arnPirir, l'lr'l)'
October 22,1991
Eve B. Nott
PO Box 792
Wail, Colorado 81658
RE: Hazard Mitigation Evaluation, Nott Residen ce,2645Bald Mountain Road', Lot 1O', 13d'Filing'
Vail Village.
Dear Ms. Nott:
I visited the above referenced home in Vait recently for the purpose.of a geologi ohazard evaluation'
especially as it pertains
'"
iiretii"" i" piace to t"d;il ;d"inst debri-s'avalanche potential' As you
know l{igh Debris Flow it;;;;; Itupp"a for ttris propertv in 1984'
Withrespecttothedebrisflowhazard,Ibelievethatthelargebermwhichvouconstructedsome
vears ago witt "fectiJUy
aiu"J no*, t" th" #;;;;; f;;.t as the oicsent channel is now
tonfigrrred. Obviously,;ih;i;;il;ehind the U"r"t rJL, *rth time, it mutibe periodicaltv cleaned
to perform as designed'
please reference the Richard Berridge map dated August 20, lggl.,,inconiunction with this letter'
This horne i, no* ou iiii* nJU,irtr"* Li"";;;;"ii'" ri"t will now iollow the bottom of the
i*""i'i" a"fineate the lo*"t '"u"h"'
of this hazard in this area'
Thepropertydidlieinagcologicallysensi.i*Tabutdevelopment.ofthebermasindicateddidnot
inorease the hazard to other property, * r1#;";";;'; ;blic rights-of-wav' roads' streets'
easements, utitities o, f*itiii". * oih"r-prop"##i;y;tJ' iiitt"t" ite turther questions' please
contact me.
SincerelY,
Nioholasl-amPitis l
Consulting Geologist
NL:bac
ti-
--' t -i
\\
o
I
I
t
t
I
I
'
,*,,,"r,,o.o,r i-....
\'
^l lglxl^nort -/-z- <rr{tlrucTlollclt \\_ / uru-oanonor \\l \ t/-
-,
\\\\
\.\\-- -' *4,-ffii*"
\
60'
I
o
Attachment 5
Supporting Letter from Engineering Designworks, Inc.
o
December l-0, 1996
Evi Nott
2645 Bald Mountain RoadVair, CO 8L658
Reference: Debris hazard assessment for
Road
To whom it nay concern,
30965 Motfat Avenue P,O. Box 775729
Steamboat Springs, Colorado 80477
(303) 879.4890 (303) 949.4823 FAX (303) 879.490s
house aL 2645 Bald Mountain
The following is a surunary of our findings per Evi Nott,s request thatwe investigate the potential for debris damage to the above referencedstructure
A site visit to the structure lcicated in Lot 10, Block 2 of thethirteenth filing of Vail Village, in Vail , Colorado was perforned onoctober 10, 1996. The structure itself appeared well four:ded with noapparent signs of foundation movement or slope instability. A moderateslope immediately to the north of the structure rose for a dj-stalce -of approximately 2O0 feet through a dense stand of aspen trees. Beyondthe aspens the slope steepened considerably and the vegetation becamernostly sagebrush. The slope lessened in pitch several hundred feet,higher.and again was forested with a large aspen grove. No signs ofslope instability or debris movement were noted, and the maturity ofthe aspen groves indicate slope stability for the past decade or two.
The Arthur Mears 1984 Debris FIow and Debris Aval_anche Hazard Mapsprepared for the Town of Vail indicate the structure is Located in amoderate debris fLow hazard zone. The Charles S. Robinson 1925Geologic Hazard Maps also indicate the structure is located on cheedge of an area of rrpossible recurrent flooding, debris flows andhydrocompactiontr. The hazard is due to runoff from the slopes above.
A large berm and ditch were constructed by the owner i" fge+ to th;north and east of the structure upon recommendation of Town of Vailofficiars. This berm/ditch forlows the naturar drainage path from theslopes above (north of) the structure and channeLs seasonal fLows to adrain at Bald Mt. Road to the east of the structure. It is our opinionthat the risk due to flooding or debris fLows is greatly reduced. bythe creation of the berrn/ditch structure, and tElitThe-bi:rmTditch doesnot adversely affect or increase any tlpe of hazard to ot,herproperties.
Like many subdivisions in this area, Ioosening of the soils in theslopes above could result in mud or rock slides during particularly
heawy rnoisture years, but the slope behind the structure showgg!_*noindications of such slope faiLure, and may in fact be Lessto such failure due to its southern exposure, and appare4t'content. It is our opinion that this structure does notsignificantly higher risk of debris damage than rnost in
a1/Sincerely tfu4 D'/.,^-
Craig B. Frithsen for Engineering Designworks, Inc.
ENGINEERING DESIGNWORKS. INC.
/evl
Attachment 2
Additional Background Informrtion
from Ms Nott
OVERVIEW
Lot 10, Block2, Vail Village 13th Filing
BACKGROUND
Not until recently, when an application was tumed down for a local bank home equity loan due
to the fact their town maps include many properties in hazard zones, Lot l0 among them, did it
become appa"rent that the 1984 mitigation efforts to Lot 10 were not documented. Explaining the
situation to Senior Environmental Policy Planner, Mr. Russ Forrest, he assurred me that it is a
routine matter and town regulations are in place for such circumstances. (See attached map
examples.) Of significance here is a quote from Andy Knudson contained in the enclosed letter
stating tlrat a "high hazard" debris-flow designation on Vail's planning maps "was a very 'broad
brush' and not necessarily applicable to most of the mapped 1ots" (enclosure #l), It is significant
that this enclosed letter was submitted to the Community Development Department as part of an
application for a new two-story large home addition with a wooden foundation to be built ten feet
from Lot 10's westem property line -- both lots being in the same mapped hazard. zone. This
addition was recently approved without any special hazard zone building requirements -- in
effect adjusting the hazard-zone designation. Mr. Forrest explained that this was allowed
because effective mitigation was already in place on Lots l0 and 1 1 . These mitigation measures
are explained in enclosure #2.
Because I am not applying for a building addition, etc., the procedure for documenting effective
mitigation measures in order to adjust a portion of the existing hazwdzone on Lot l0 is different.
Council approval is required rather than Community Development and Design Review approval.
It should be made clear that the Town of Vail or any of its officers or employees hold no liability
for statements and/or decisions regarding hazard areas or geologically sensitive areas. (Please
see enclosue #3, Sec. 18.69.038 Disclaimer of Liability.) As we have spent a great deal of effort
and frrnds establishing effective mitigation berms and a new channel, it is appropriate to have the
hazad maps reflect these improvements and "clear" the building (home) and certain lower
portions of the lot from a "hazard" designation. The portion of the lot above the mitigation
channel will remain in the current designation. As the maps presently show, the house actually
appears not to be in a "high haznd zone" but because ofits grass (sod) roof, the aerial photos are
unclear. (It is stated in the Hazard Study Report that "hazard lines terminate at the uphill sides of
buildings; this indicates that flow energy will be absorbed by the building"). It is apparent from
studying the maps that most homes are not included in high hazard zones for this aforementioned
reason.
A Colorado licensed Consulting Geologist, Nicholas Lampiris, Ph.D., was hired to do a site-
specific study as required by Town of Vail zoning regulations. According to Town of Vail files,
Dr. Lampiris has executed many site-specific analyses for owners of properties in similar
geologically sensitive areas. A survey ofthe lot and new steam channel was done by Eagle
Valley Surveying Company. A revised hazard map for the lot was drawn by Mr. Richard
Benidge, licensed Landscape Architect and a former Vail area land planner. All professionals
contapted regarding Lot 10 support the effectivness of all mitigation measur€s presently in place
and concur with Dr. Lampiris' findings.
If you have any questions, please don't hesitate to contact myself or Dr. Lampiris.
v4bv
$r
5,*B
I $ $$F F xiI $ rdu: $ u"n
^d E* a
\,+:ilJu-i(,SJrN&$$[
N=n
I
$
fl
)-
n
c'lll Ixs'q\- \t, +LES
trrrsii9 q $ tx
irhll--s F A $io { f Flgq$:
.\\r;:n.'r" il d tiV d N'S d {o
II
:JFs
II
dD\Jg
lr\-
Ns
N{lltr
l+t\
L
)-
Fvn
t\
$$fis
J
t+
&
6
$F:
$t
.l
tr3
J$
$
N
4\
lt\
f,
1
,*
6
t-
F
s
s
a€q
l\
itts
N=
o
rLl_14
'll
.t1l
r'1.gI
:l
I;i
1l
ri'rl
!ij{
;l
_l
Ti.at
4
aIa4{t
,
,l
t
i
i
.--kr
.ENCLOSURE +1
4 / 4/96
i:H':: $:ti:"11"
RE: gspr1" H.rza:d for dupl€n ot
tlcar Hr. HauriolIol
E!{GINEERING & DESIGNT INC
sharpe/ PE
Eliuerrsur Ensi,13,1iT t Urr),,16*Tnjj{,:lr1. ccftcrtr, M? ler(.h,1fi.iiTj',:ftHi gi:lil
2625 Bqtd r,t{ru::taln Rd (cl&D Joh# 96{I3)
\
Per. the r.equeet cour septenber, ,;f"':::l:-llolr ttt'^ '-'
rne cuplex ,. ,o"li-inveetigJ[io,i'i! -:-":-E9t-Er:&'aarize:-T: lindinss or
It+*rE.rri iirili"l!0":1,'ii;iiiifi$iiil'i;!:iil"i.31["i'li",r"c."iii*.
i:iiii:l]\!:";, lt' I r y r o ffi ;: ;i" ;l.iiii
- ":llf; :"$:;."o0: tkf;_ ;:.*",;::F;,:'.*l*"*:1,, lff "ri!., i:ilrq:lii::it*"i:i' *l r.:iii:it*,
Tire !o'*a of v*{r's plannlng naps "13:g this rot to be in.,,hron;iilifr.fii:f 'il:i"I:a"".."'oui'i.3'.u". roi J.-*riil -til
p ran^ring"nioao-Ei;ir,,,*J,I,a ll;"1::l"llliii.l#l*;$.:Xigf:Ftr!1,:.;g;il ,".",The structure appear"g .rtlr tounded,, :re oo lndlcarionE of, founilationr:;:t:T: :5";::ri":ti.itt*i:i;Hi;{q"iiiCrylrl*qii,ilu=*,t'i*;"t,.
cignE of sL'ain o:..??:t.-cu,,rtru"tlor:-r,rovemsnt. No ingi."tlons of rockor other debrrs ddrrrage "u" nJi"i,'itr Tt nei.g$ois-r.ported none hasoecurred since the sLgustrrre,"-c6nltruction.
rhe dedatty ot rh€ A:ge{r-srovss near-th€ lop ano botton of the hi.IIappeers to rrr0icel.e lttrle roct* moisnrent hai o-d;";;;; rn thE ]as1:ccverar decacres' r'ika rany suuci'rigtor,s i"-t[i"-iir", too."ning ot theroilr in the mountoi..rropiu-i"iio-reeult in rnud or rock sri.des durinoirarriculoaly harvy_nolstur.c v*".1*; frui-tire-sf rpl i"fri"O thls duplexstrowscl no lndicarl.l. gl "ucit-"i;i* farrure, and 'sy rn racr De of rower$u$qeptrblr:,ty du€ to lrs trrgr: ro-ci content and souihern exposufe.
rt 1r thr opisi.on of thtB olfier t-hf,t thls Elfucture dorg not hrv. a11s-aijigrntrv_higher risk o! acbri; e""isl tf,i; fi; rn th. vair rrea,ancl that cn trdditts",l::tg1!y. aceigneo "iA construcieA per nortral uBC.guidartner Elrl nor rncrla'-tnr hirara to.oiiili-iiiiertv or rrrucru*r,or to publlc butrdtnga, rrghta*of-way, rordi, rtririi, irse&ant',utilitlas or trcllttle!.
1,la hope thls letter provitles LLe i'rrrrruaLion desired. ple.ase do nothesittte t(' corlLd,JL i.rs if wB mul. bs of further aegtstance,
Eve B. Nott
Enclosure #2
MITIGATION DESCRIPTION
In the spring of 1984, a small, seasonal, spring-fed underground stream on the east end oflot 10,
Block 2, l3th Filing flowed above ground and, after several days of rainy weather, overflowed
onto adjacent land and the street below. No damage was done to any structure or building. All
landscaping remained intact. During this time-frame, the owners, at their expense and under the
supervision of the Town of Vail's Public Works Department, constructed with the appropriate
healy equipment a large diversion channel extending the entire length ofthe lot. This new deep
channel adjacent and above the original stream bed has fully contained any and all subsequent
water flows. Additionally, high berms were constructed along the channel's banks to further
enlarge its volume and "carrying capacity". Stream flow volume has always been a fraction
(<l/20th to 1/100th) of the new channel's capactty. Another massive berm was constructed
along the western and northwestern lot lines and 20 larye blue spruce trees were planted for
further protection. These berms form a protective basin and barrier for any flash floodings, etc.
All these mitigation measures remain in place.
ENCLOSURE #3
r.q.rrz.uJo t nsctatmer of liability.This chapter .is based on "scientific and engineeringconsiderations which are .""ri"""'v - #;; '0.-"1[0.0.
Compliance with tir.-. prouirt;;- herein cannot insurefreedom from risk 10 lifi ;"i;i;';, property. This sectionshalt not create riabirity "; ,h;;";i of the Town of vail orany officer or employee thereoi for any damage that mayresult from reriance on this chapter, o. "ny administrativedecision lawfully made t.r.unA.r. The designation ofcertain areas as' hazard areas or georogica'y sensitive areas
,pj:::il,-1-o r"pr.incorporated into ttris section: ao., no,lmpry rn any way that areas nor so designated a;; f;;;;"*1I rir{ to life, salety or properry.(ord. 5(1e85) $ 4.)
f 8.69.036 Discteimer of tiabilifl
IAtCachnent 2
Pitkin County Public Worl<s
76 Service Center Road
Aspen, Colorado 8l 6l I
(970) 920 s390
Fax: (970) 920 5374
October 9, 1996
Mr. Russell Forrest
Community Development Department
Town of Vail
Via Fax: 970-479-2452
Dear Mr. Forrest,
I was employed as the Public Works/Transportation Director for the Town of
Vail in May of 1984 and was responsible for the deployment of Town resources during the
mudslides that occurred at that time. After the Bald Mountain nrudslide, Ms. Evie Nott
constructed a diversion channel above her house approximately l2 feet deep and a berm
approximately 25 feet in height as mitigation for future mudflow events. It is my opinion
that this structure should effectively divert all but the most catastrophic future mudflow
event away from Ms. Nott's house. Please call me if you have any questions or if you
desire anv aclditional information.
PBINT€O OtI
REGYCTEO P PEF
Sincerely,
Stan Berryman,bctor of Public Works
Attachment 4
Letter from Lampiris and Map
Couutt{s & l.rruPtnts
(ltNltll,TlN(l ( ili()l't rilsl s
P.O. Box 23
Sll,'I, Cu.oltnlx) 8 | 652
PlroNilF^x (9?0) tt76-5400 (24 l{ouRs)
,,,'.'Ttfrl*','r'u'
Ni.iolas l.arnPirir, l'lr'l)'
October 22,1991
Eve B. Nott
PO Box 792
Wail, Colorado 81658
RE: Hazard Mitigation Evaluation, Nott Residen ce,2645Bald Mountain Road', Lot 1O', 13d'Filing'
Vail Village.
Dear Ms. Nott:
I visited the above referenced home in Vait recently for the purpose.of a geologi ohazard evaluation'
especially as it pertains
'"
iiretii"" i" piace to t"d;il ;d"inst debri-s'avalanche potential' As you
know l{igh Debris Flow it;;;;; Itupp"a for ttris propertv in 1984'
Withrespecttothedebrisflowhazard,Ibelievethatthelargebermwhichvouconstructedsome
vears ago witt "fectiJUy
aiu"J no*, t" th" #;;;;; f;;.t as the oicsent channel is now
tonfigrrred. Obviously,;ih;i;;il;ehind the U"r"t rJL, *rth time, it mutibe periodicaltv cleaned
to perform as designed'
please reference the Richard Berridge map dated August 20, lggl.,,inconiunction with this letter'
This horne i, no* ou iiii* nJU,irtr"* Li"";;;;"ii'" ri"t will now iollow the bottom of the
i*""i'i" a"fineate the lo*"t '"u"h"'
of this hazard in this area'
Thepropertydidlieinagcologicallysensi.i*Tabutdevelopment.ofthebermasindicateddidnot
inorease the hazard to other property, * r1#;";";;'; ;blic rights-of-wav' roads' streets'
easements, utitities o, f*itiii". * oih"r-prop"##i;y;tJ' iiitt"t" ite turther questions' please
contact me.
SincerelY,
Nioholasl-amPitis l
Consulting Geologist
NL:bac
ti-
--' t -i
\\
o
I
I
t
t
I
I
'
,*,,,"r,,o.o,r i-....
\'
^l lglxl^nort -/-z- <rr{tlrucTlollclt \\_ / uru-oanonor \\l \ t/-
-,
\\\\
\.\\-- -' *4,-ffii*"
\
60'
I
o
Attachment 5
Supporting Letter from Engineering Designworks, Inc.
o
December l-0, 1996
Evi Nott
2645 Bald Mountain RoadVair, CO 8L658
Reference: Debris hazard assessment for
Road
To whom it nay concern,
30965 Motfat Avenue P,O. Box 775729
Steamboat Springs, Colorado 80477
(303) 879.4890 (303) 949.4823 FAX (303) 879.490s
house aL 2645 Bald Mountain
The following is a surunary of our findings per Evi Nott,s request thatwe investigate the potential for debris damage to the above referencedstructure
A site visit to the structure lcicated in Lot 10, Block 2 of thethirteenth filing of Vail Village, in Vail , Colorado was perforned onoctober 10, 1996. The structure itself appeared well four:ded with noapparent signs of foundation movement or slope instability. A moderateslope immediately to the north of the structure rose for a dj-stalce -of approximately 2O0 feet through a dense stand of aspen trees. Beyondthe aspens the slope steepened considerably and the vegetation becamernostly sagebrush. The slope lessened in pitch several hundred feet,higher.and again was forested with a large aspen grove. No signs ofslope instability or debris movement were noted, and the maturity ofthe aspen groves indicate slope stability for the past decade or two.
The Arthur Mears 1984 Debris FIow and Debris Aval_anche Hazard Mapsprepared for the Town of Vail indicate the structure is Located in amoderate debris fLow hazard zone. The Charles S. Robinson 1925Geologic Hazard Maps also indicate the structure is located on cheedge of an area of rrpossible recurrent flooding, debris flows andhydrocompactiontr. The hazard is due to runoff from the slopes above.
A large berm and ditch were constructed by the owner i" fge+ to th;north and east of the structure upon recommendation of Town of Vailofficiars. This berm/ditch forlows the naturar drainage path from theslopes above (north of) the structure and channeLs seasonal fLows to adrain at Bald Mt. Road to the east of the structure. It is our opinionthat the risk due to flooding or debris fLows is greatly reduced. bythe creation of the berrn/ditch structure, and tElitThe-bi:rmTditch doesnot adversely affect or increase any tlpe of hazard to ot,herproperties.
Like many subdivisions in this area, Ioosening of the soils in theslopes above could result in mud or rock slides during particularly
heawy rnoisture years, but the slope behind the structure showgg!_*noindications of such slope faiLure, and may in fact be Lessto such failure due to its southern exposure, and appare4t'content. It is our opinion that this structure does notsignificantly higher risk of debris damage than rnost in
a1/Sincerely tfu4 D'/.,^-
Craig B. Frithsen for Engineering Designworks, Inc.
ENGINEERING DESIGNWORKS. INC.
/evl
\I
I
I
I
t..
I
I
I
l--.-
!I
I
I
\\.>./r \Exga.az^rDrca{a ,/ '\
lstanntrprv -/,/-- @r|3ll(rct(ra OP
/ Div"rnoNonqt\. J4.\.\\\
#\
drt-.#,."b.6'trl"E
0' n' 6lru
i.r l'r
RICHARD D. LAMM
GOVERNOR
_co!oRADO GEOLOGTCAL SURVEYDEPARTMENT OF NATURAL NESOTJNCiS
?15 STAT-E C_E_NTENN|AL BU|LD|NG _ t3lg SHERMAN STREET r.. DENVER. coLoRAoo 80203 pHoHe roogia66-riir' '.-- .
PRELIMINARY EVALUATION OF ROCKFALL HAZARD
IN THE BOOTH CREEK AREA
PREPARED BY THE COLORADO GEOLOGICAL SURVEY
FOR THE TOI,IN OF VAIL, COLORADO
1983
GEOLOGY
STORY OFTHE PAST... KEYTO THE FUTURE
1.
2.
3.
4.
7.
8.
9.
10.
Summary.
Scope and Methodol ogy. . .Site Description
Geo tosy_ of irockf al r sourie il;;;. :: : ' '
Rockfal I Mechanisms.....
f \ 9:illilg.'.qnd Di ffere;ii;i - i;;;;;;;;;' ;' ;; ;i;' ;;;;; : : : : : : : : : :l.l t0pography and Dip of Strata...4.3 Factors' Tiiggerins Ricliiii;:.:'Hazard cl assiriciiion ino t;r;ii;;::" "'
:.1 Hazard Zone Delineiii;;.:::;.::"s.z Rockfat I versus Gi;ii;l'0;;;;;';i'B;;i;;;;:. : : : : : : : : : : : : :: : : ::.? Disturbed Versus_Undisturbei'iiockfail Boutders..5'4 Factors Used to_npproiimai.-ng., and Recurrence Intervarsof Major Rockfai i evenis.. .'1.!. s oi stribu'on of . iocriiii -e;;;;;:
: : : : : : : : : : : : : :. : : : : : : : : : : : : : :Potential Sot utions to Rociii.ti'iiii"os6.1 Rockfat I Evenrs fnvoivini'Sriii." Boulders
E:t iii?: :ll?_rairure nocriiri' i,.rrt,
snow-nvai;';;;'i;;;;;::::::::: :::: :, " "Conclusions............---- - - - "'
necommenJiii;;;::: " '
neterenies. ::.. :: :, "'
TABLE OF CONTENTS
Figures
lg:lti9n lgp of the Study Area.Geol ogic
_ Di agram or comp6un;-R;;i;;;i
_ Study Area..
Pag e
I
1,.'3'
3
5.
6.
7
8
8
8
9
9
10
10
t2
I2
13
IJ
14
t4
14
l4
16
t7
Pag e
2
Figure 1.
Figure 2.
Figure 3.Figure 4.
Figure 5.Figure 6.
Figure 7.
Pl ate l.
Slopes in the
Toppl ing S'lab-Fail ureLimestone Bl ocks Resti
Sequence.4
5
Cliff Source Area
ng on Shale pedestals, Upper
Slope Creep Diaoram.Physical DifferEnces
_ Deposited Boulders
Between Rockfal I andin Runout Zone
l4ap. . .
6Glacially
Snow Avalanche Haiard
Runout Zone Hazard r,rap, Booth creek Area Rockfail HazardStudy (Accompanies i.iport)
,,il ,*rrK AREA RocKFALL ,*urrr?orro*
Summary
Rockfa'l I Hazard in.the study area is determined to be extremely high. Rockfallevents can generaily be divjded into two_categories; 1) inose invorvjng massivetopplins slab fairurers -or ine .iiti racell-;;i-i;''tnor. invorvins smarerind'ividual bourders ratiing"-ori'u,. ;ds.; Ji-tn6 vlrtical criffs due rodovrnsl ope creep.
1) Boulders and slabs shed downslope durirg toppling failures are on the orderof 4 to 10 tons und i.rJ-.l-. ii;;;i;;; .at- 70-mph'br m6re as thev enter the upperrunout zone, where numerous resideniiar strutiur";';; j-ocateo. It is thoughtthat events of this. nature proraojy occur every 40 to r00 years. It is noreconomical ly or technically'reaJi-bfe to arrest,- deflect or stop rocks of th.i ssrze in the present.physiial sitJaiion..]he onry-uiiiinative solution .is toprevent toppling fairules uy securi'n.s. lhe joinlei unstable criffs throughwrremesh, gunnite ap-pr'icatiori, ano "octiuottin;-;;i;;osl costs_ for stabil izing;::":tiffs above the area mav run ai r,i9n u.-tro-io-iirree minion doilars or
2) smaller individual b_ou'rders falring off the verticar cliff edges aregenerally on the orden.ot soo-to r'ooo rbs and are expected to be traverinq atspeeds of 50 to 60 mph as th;t;;;;, the uppei "rioui zone. This typd ofrockfall is more frequent and is expected to'occur perioorcaily every one to;H:;r';11',;nrTo",.ui:^:llgg;l.i oi,'*"l*v--Jii"J*="'weather condiiions or
c o nt r o r r e o *r r o u g h li "': ffi l i ;, JJii,' o.T
J : l ;r _.1f,,", 11 ;;r
,oill
"
g;,1: i *f.ll,
"
i ibuilt on the subiilr:rgr-';i;;;;i;:'-"such structures wourd have ritre or noeffect on larqer bouiders'oei''iveit from toppring failures. costs for several'individual or one large-area-wide structure are "itimatea to be on the order of0.75 to one mirlion doirars." sr-r'ur E .'re esLrrnaEec
Rockfall boulders at the.base of steep slopes in the study area were examinedand used to tnap the I imits or- tn" *nout zone and del'i neate several hazardzones' Disturbance. of many roctla]l'iouloers causes al'rricutty in accuratelydetermining the maximun .*i"ni;i i;; runout zone. Ail areas within the runoutzone .are subject to signif ica,nt though t."yi;;-irori,iJ'or rockfar r hazards.
This report presents the resultsconoucted near the mouth of Boothilroy area shown in Figure 1i;;i'those tots in vait vitiige Fiiiri
and concl usions of a rockfal I investigationCreek,for the Town of Vail, Coloiiao. Theudes al I of Vai I Vi I I age Fi f I ng No. -iZ,
anoNo. 13 east of Booth ereek.
Analysis of the rockfall problem was accomplished through aeria'l -photogeologicrnterpretation, examinafiJ; -;i"";.;;si;tir.i;"'-uir,""int""ui"", with rocalresidents, and fierd studi.i oi'.oc'titail source areas and runout zones.
The cl iffs and steep s-lopes above the residential area were traversed andexarnined for evidenc::I ilriqiJiill," degree of hazard, and ro .investigate theparticular mechan'i sms responsible fdi causing rockfalis. Each large bou)der inthe runout zone was examiired to aetermine wh6ther it was of rockfall origin orglacially deposited, and a"--";;i;i'whether or not it had been moved or
Scope and Methodol ogy
-t
ffi-rT':r-9ffi
'sit/+
2.---'t\
FiS. t Location l,lap of Study Area, scale l:24,000.
-2-
'disturbed bv the u.-tl., of man d!"ing.,d.^y.:r opment !lrn" u.uu. Additional ry,weatheri ng patterns, 1 ichen s.orii,' ;;td surface posi ti on of boul ders and sl absI n the runout zone were inat yz6Orecurrence inter;;rs for rarge rockfrl? ntttj: a prel iminary eitlmite' or
5i te Descri pt i on
The steep s_outhwest-faci ng s1 opes and rocky cl .i ffs i nves.tower t,boo it ij"o6 m) ao6ve v;ii village Filins 12 ". ,tfXt"""1;Jrir;;r;:::;:
l:S;iri;Jt?;'r;':r,"tained ;ithi''i't'oiizontar'olitin." or 1,700 rt (szo'ilj
severat ioner-"ni;;'1i"1,i,19'or'. tot".:tr.['iiE'l;.oJ]i]';.'Jf can be oivioeo intoportion of the eo"" ir..l"-v.rj""y "ul"ionows: (Refer to 'fi;: ;i.r. a10ng this
A)
val l
be en
from
D) U
I ower
befo re
Runout zone -ey wal i. Thisdeveloped as a
cl opes of 28 percent to 45
the cl i ffs come to rest in this zone.
area .is moderately tvoodedrest dent i al' subdivisi on.
percent along the footwith fairly young aspen
t ne maj ori ty of roc ks
of the
and hasfalling
?i,,"o$iE.]fl*li*#*#..- ,:l;:"'*.o[o,uiou?i,l?'1, J,",rf:,,L:::['.iJo"J:?;o:irest on these srooes due--to the stee-pness. sparse, stunted aspen occur insmall stands. but generar]r ilie-sro*t-q" not support much vegetation. Rockstraversing th'is poitionliir'.'iio'pJ="tr r continue to gain energy and momentumas they ro1I and skitter downsiril. '
iiil
Dou tders onto the accl erat i on sl ooes
.- t.s0,f!. ti_s! .(16 m) ct iff of jointed
Jerl.ical ft ('l0m) above the runoui-ion".rn otameter periodically detach from therney topple over and shatter, showeringbeiow. (Fig.3)
steep (68%) shale slope above thea higher cliff to gain momentum
-.Gl acial ti I I rest,ing- on top of the upper cl iff
. diam_e_ter granitic borlloeri-!ownsioie wnich rol Iis till slope is considered io Ue J-pu.t of the
iil,: qis'r".'J,'""0t'.jii|'o"?io.n or','#"Jn'.
Ii???and free fall'and b.ound downsiope ano off tire lowei-cl"iff. Most rocks do notshatter, but remai_n_ ur- intu.i-a-p'pioxrmateiy gx5 ft (2.5x1.5m) rimestone
?Fil:";; wh i ch are capiot
"'oi-."r.-r'''i"ng the farihest r imiti of the irnorl-ion".
ii",*###,nff5fi%#ffiand.fail off the clifis. ih'upper source area.
Geology of Rockfail Source Areas
The geologic make-up of the criffs above va.ir viilage Firing rz is shownotagramaticallv in Figure 2. seoimlnta.y strata u*pos.Tin the criffs are partor the 14inturn- rn"m6lisn or uiaor e p.;r;ii;;;i#"ig'i, and incr ude beds ofiil'it'"'i;'!gl'tli;t.,.ii'ni.-'i..itJ, anu rimestone. ih; beds strjke N85",u and
'unoiionu""u.;"' Ji;i otJ'rr"rtn1?t 'rlli;,n tJr..r.-::l,.1;il,l;:*lnli.:lt*i
ope acceleration zone - A
i f f al I ovrs-Iill?Eiifrom
rDorne at the cl iff edge.
- 3_
t3Rc =,.ts:t aLAc'nl- -( | !-LI
en Cf .i,ltA
!r?€-=!?. ShALF
Ac.Ei-t-tlA-( la
'\J5LcP€-
Lou-,eA !r /,i=:To^J€
t€o65
=F___::;_=__=--=-
. Scale 1 in = 200 ft
9:ol:gl. diagram-of compound rock_fat1 slopesIn study.area. Drawn tb scale with no veriicalexagerat'ion. Note dip of strata towarO'vailey.
o PP=A t-rt1a'i7. Dt-'C
CLIFF
==:-=-':--=-=:-=;t---:-:-----;--=--=_:--=---=- ' - ----=--=-----*
- -:z?=tz
- -=--: -
Rc.-r-Fl i-,- so
ZotJ-
COLLUVT(,, n\ O ,\,/
ACC€L::,? *7/ rr.J
5r,:Pg5 \-.4
LO\r.,rel),
S}NDs.ToNE
Cr-tr-FS
--:-:- - -
Aow,4i{ €Roorrrc
Sli;tLE Eg-f 5
. it.:o.!'i -!-a, I t-
t?,::r olr.r 74g- 1STf.,Jc?er?Ii \
Fig. z
ACa€a-iri'iTlOr,!
-4-
t21E-:-'----tj-:-----
:--:--:':="-
iE=_-;=9l-:---'u'-- --/4--/---
z.
P=--
oo
'2:l
F'is.3
-=--=--:-
Toppiing Slab-failure Sequence
1. Initial cliff configuration2. Differential weatheiing-of soft shale beginsto undercut massive cliff forming slabs. Jointsopen and widen due to slope creefi and frostwg{ging. Spr.ings issue fiom contaii beneathclrtf-3. Undercutting continues. Joints widen and arey999ed open by smaller rocks, causing slab totilt outwards.4. Slab falls from cliff face onto acceleration
_ :lopel, bringing down overlying rocks.c. JraD topples and shatters, showerinq runoutzone below with boutders, and exposing newcliff face to erosron.
-5-
to
o.
.. ltLL
u/|4'efio}{.E
Fis. 4
SHqG
Lirnestone slabs resting on weak shale pedestals,upper cliff source area.
Lrn€sfo,\{E
LEOC'E
co/Eso
Fig. 5 Slope creep causing Iimestone blocks to move dor^tnbeddins-ptqn9: and-off towei-ciiri eage. -sioi[;"ur.
genera) 1y z.ft x. 3 ft. This nrechanii,i-i, ,erponriui":for frequent rock falls jn th;-study area.
-6-
ilo;;;; ::,''.,:J-^::,o,=!-,ne. sanoston" ,lj'.*,lu-r^ty:^ffiifent jo.int sers strikinsNU5"l{ and N55ow' .Th.es-e iointJ.o*iin. to separaie li;ge srabs and define the9l!ff face angle visiure rrbm-irr""rlir.v u.ioil.''nuou.''jt" sandstone is a soft,Tr'lable course sandJ conglom"iuilc'ueo- 3 ft ihilt-"rril'n weathers to a smoothr0unded redse and _iontin-uai it ;;;gir!r a z t;-a ?;'-thick dense, hard srayrlmestone unit resting. above -it. -ir,L
i,i1n"s10r. i! ,,Jin'r.d .o that subanqurarchunks 2ftx3ft (.sxtfr).^.r.lii*gys'iv o.tu.t r"o, irre" ueo and far r ori tnesloping cl iff edqe' It is these limeitone otoctcs-lnai'-.r. .orronry involved inthe more frequenily recurring-.rinii-ttrat can-oitiii-iuui. oamage to structuresrn rhe runout zone, such as the event in uurrv irii "iigas.A thick shale unit between the upper and rower cliffs has weathered back to a68 .percent sl ope. ^rne Jnir ; ';r -5;;i , c.t ayey-, .;; ;h;"; ev id.ence of .tocat i zedslrppage and small s.lope raituris-ihii p.o6u6t'y ot".u'" o|irrng lntense rainstormsor heavy snovrmert- very.smat-nruaii ol* upp"u" to start on this steep srope andspil l over the rowe_r .i.iit-.ds;;-'il*y a.rd capabre of -disturbing or.initiatingffill:lt;rllrf::,ders happer"id ui,"l,rr u,eii.[Jtr,i,-'oi.restrns near points of
Resting on this softru"rgd.ilg -*u]. is .a thicker c'riff-forming unit of theKoDrnson Lirnestone. .This bed of dense, hto,;;;y i;;;rtone varies from 5 roapproximaterv 30 fr..th.ick (1-.s t" fi;) rn .*rp'rir;i ;;;; and is the source rorthe largest rockfar.r uouiciers
"n"ornt.".o.rn
-tne ""r-nJui .0n". The rimestoneboul ders that detacrr f rom th; .j"i #'are qu r te res.i sfeni- ano tend not to breakup or shatter on their.wav downiiopu.- tne'lar!esi;;;;'l;", found in the runoutzone appear to be derived rrom t-riis upp"" ciiii:6;;;; rimestone.
The shale zone up9.n wnich the upper limestone criffs rest is weak and byerosron undercuts the massive lrmtiione teos-us;.;;;;;ng pedestar-rike brockswhich eventuai I v topp'l^e oii'ir.'.ii'i...t,.r. -ft'd rl,n.iione is jointed such thatblocks approximitet'v gtixdt;";;; ?purut"o from the c.riff and tit t outward' toward the cl irr e.o!e. Thinnei'b'eii with'in ttre' t ime-stone ci iff proouce mores'labby rocks that if not t;;;;; onii tn.rr -edges by chance during the initiarfall, remain flat-side aown on tf," ir.ep slopes.
An eroding slope in glacial tirl rests direct.r y above the criff-forming upperr lmestone in the no-rthern p.rt oi- the , study -;;;..
. The ero_di ng sr opeperiodicar ly sheds. -Tt to zt_[-'o-ia."'smooth, rounded granitic bourders wh.i chtumble down the cl if-f inio iit *"rrt zone. 0ttrei-Jreis of this til t fartheri:;;.'1.3:fl,'l:;l:tl,;B::.;"lil:"*t^tior",'.no-.i.'not activery sheddins
Above this til I , s-rppes fratten dramat,icar.r.y to grades of 0 to 35 percenr.Large stands of mature aspen inoiiiie'that these gentre upper tiil sropes arerelativety stabre. .ruo ofne'r';;;;;;;, sources- perrinent to th.is study existii:tt these gentle sropes, wnictr-silrt at an erdvatjon of approxjmatery 9,450
Rockfal I Mechan.i sms
several natural g":].0:i. rng. topographic factors combine to cause rockfar r srrom the c'riffs exposed- on the iroitn'valrey ";ii ;; c;re creek. in the studyarea' These factors^i1^ci-goe j;;r;-;;i't"rns,-differentiar weat-hering of variousrock types, dip of strata, ;nd'th;-;iope 6r .irit!'uni'uc.ureration zones.
-7 _
'Joint patterns in the -c1 iff forming_.rocks are caused by stress rer ief andphvsical properties or-i;;' r;;l:"' -rne-jotnt, #"ilrruo define the olanarvertical cliff faces-and act to ieparat-e riidJ-iecl-ion! ot the cr.iff into'srabsal ong joints subparall ei to tnrl-firr ru.". "-o,ic'e'i' iiio has detached from thesedimentary bed,'.it be.gini-to'i""ep, outwards due to-gravrty and frost wedgingln the joints' The ioints widen "iin-ti*e,-ini-ir."oiien wedged farther apart
?i.'li'3 ):oo.'
or smai t "i rd;ks 'uiuf
rur I -info trie;;;;ral i;;ded by' ;i,'.-'ioi nts
Differential weathering_ is,the procsss by which soft weak rock types, such asshale and claystoxe, _-erooe iwlv-ias!9I than adjacent beds of rimestone orsandstone. As time passes, th; ",11,^Jit_-",1.-dirn-rirr-., and clay begin toundercut the more^I":.]:!:nf. overtyrng sandstone! or rimestones creating ahorizontal groove or-crack at the bise-of tn" iiirr iii.rr ".roves support forEne rocks above' - Eventuar tv, 'tr,".,'o^uerhanging-
re-d_ge Decomes incapabre ofsupporting its own weight, inc -iir,rs. or topples from the cliff. If theoverhansins s'rab.-ll: giii;oi.'i-.t*r,"d fronr 'fne -cr'irr arons ioints ancr isresting precariou-s'ly on tne-"snJiel' unoer_cutti;g aio' oitterentiat weatheringaccelerate the process which finalfy results in -tne ineuitab_le topp.ling of theslab' As the lu:n-"..^sr-ios toiiie''onto tne accerLratron sropes below, theyusual I v sharter' into many sr:nit ter uouiJer -;;;;;' liunrs wh.i ch accer erat,e3?"iil'!iti? ?r" ;lii':r'i:ii. il; ioppr ing-'av i",:gi.,-'adjacent unstabre parts
Topography and Dip of Strata
The dip of the rgc-ri redges making up the source area arso contributes torockfall along cliffs in-the;t,;;;,area. The strata in the two cliffs dipapproximatelv 15 degrees rnto tne vili:.r,_..:y;i1's"!i,r"yoose stones, cobbres, or- Doutders on the redges to ineuiiinry move doirn io rhe edge of the 50 ftvertical drop. Limeitone rtoirsli'"pu"rt"a from their beds by jo.inting andt'reather'i ns creeD ,down towaro tt'J r;ii ;y-;i;rs' iil.#''jl pp r ng bedroc k surf aces(Fis' 5)' Preciditation tia in6'u,ineii trl Jiieitiv-o-irin. cliffs, formins manysmall waterfails. .Rounded sr."iir cob^oles and jraver move down arong the dip:l:it: and fall into the op-en-.c"uttr ror*J uvi.i'rts, wedsing slabs farther
The g'l aciated valleys -of Gore and Booth creeks both possess relatively flatbottoms and steeo.ndarry u""tl.iJ-s;iii; ih":i;p"":'rr". .o steep that once aboulder or slab't-opple! rior'-in"-.tiirr, ;t -;;;;;r''come to rest untit itreaches the rower rddtstopes of ini= '131rey.war.r,- where the runout zone beqins.An examination of tne-ruIout-'roii shows th_a_t 'l arge boulders and slabs-havetravelled onto ano.acroii p-u"ii"or'the.valley floor due to the tremendousenergy and momentum they acquire thiough the steepry sroping accereration zone.
Factors Triggering Rockfal l s
Heavy precipitation and arternating freeze-thaw conditions often trigger:::li:l].:. La.rge amounts of water may weaken or saturate ctayey shale bedsreouclng the strength necess.ary to support the weight of overrying sandstonesor llmestones' Excess groundwaler-aiso creates a lubricating effect and causessl ippage al onq creavagq pranes rn' *re sh;r;. '-i;;;" effects mav trisgerrockfal I s froni the cr iris ;;';;ement and creep of the srabs and bourders is
Jointi ng and Differential Weathering of Cl iff Faces
- c-
' acce.l erated or rea^Oi|^-r r...-l
s nov,m et t fo l I o*"0'ntiT.lt to.illils
ih ;' ;;
" "' i'"'' JIJJI!1 :X::, JJ:'.',Tmay move a slab or boulder just
othund.erstorms or igqu, snowmelt. periods
,overni.ght often comb.i n-e to tr.i gg"" "oitlutbeneath boulders expands _ouring"ire"iing,enough to trigger a rockfal l.
ofls.
and
The rocky slopes above the two c] iff s ,are so steep and unstab-r e that any cobbreor rock knocked r,-o-ose wit r roii ..0 uouno oow'nrlr;.; knocking other rocrst00se, often starting. smar t caicaoes .or rooie";;;;T;; which shower off rheI oller ct i f f edqe. ihese ir;Ti--.;bbr-.: . ;* -.;p'i6i!' or stri ki ns a r arserunstable bouroui r:r., rrrtilri;;,'u
-"o.trui t eveni.'-ieiioents report that tneyoften hear these smaHer rocks-nounoing- and ratti ing through the brush in theupper reaches of the.runout zondwier-e they sound"r*i rike animali runningthrough the underbrY:1'- l.qtnuiion'-ot-^the rockfail source area reveal ed thatmany heavi ry traver ed game trai r s- cri s-cross the steep si opes anc cr fffs. Itts evident that deer and-bigno"n'jheen 9rte1 disiodge shaller cobbles alonq the:ii;l;.*tch mav trisger rJ"g.r ire'c"iriousty perched bourders to far r from tne
As jointed slabs continue.to tilt farther out from the cl iff face, and bouldersbecome precariousry perched at ttre i_titt eog".,- ground motion resurtinq fromthunder, sonic boom'or earth t..rors is cap'aut"" oi oisrodging bourdeis andtrissering rockra'rl^. .Al;;ri;q;;l;iiu,ugniil;; th;" ir rour in rhe immed.iarevic'inity could cert-ainrv--oiiiois. runv-r_arge-rdljro"ri and srabs which arepresentl y perched prec aii orti y- o'n- sieei s r o;; r- n- t-n-u' i.roy ur"u .
Hazard Cl ass.i facation and Zonation
The rockfal I hazard-associated wi_t.h seolosic and topographic conditions and theprox'imity of dwer r i.ngs_ as describei- above is conliie.!o to be severe. Themajority of larqe bo-ura*r--r*nili*ong structures in-tn" runout zone havefallen from the it irti il-"ri"rtray''inolcates tnui-tt"'question is not, ,,wirIiilSlillr"T?l:t;:.,fT,.[iiff"'-ii'ir'.t is tire recu'r-rence intervar '6"t"..n
Hazard Zone Del ineation
Varying degrees of rockfail hazard sevelity can- be approximated by examinat.i onor the narure dnd positions oi-uorioL"s ind srabs'in the runout zone. gu.iI arge bourder was ;^1yir!0.. to a-.#-in" ,.u#J-ru.i*, wh.ich were used rodpproximate rhe extent of the t;;;;;" zone, and estimife the time spans sinceeach rockfal I boulder .ur.-iJ ;;;;:" These factors are:1) whether or not a bourder was of rockfa, origin or graciary depos.i ted.
Acceleration slopes.are-so steep and smooth that rocks traversing them are freeto deflect and skitrr r;t;;;fiy';;;ny oireclio",iiiutins from the point orinit'ia'l fa11. tn".lu.al1.n or.iruj".t6"v .. siu"n u*ii"" courd forow is sounpredictable that it.is. impractic;-l-io oil iniaie'iniiurirur hazard zones basedon the phvsicar conditio;i;i-;;;;o;r segments of the criff faces. In thepresent situation. hazard .on.i-u"l-r0". practjcally related to horizontaldistance rrom the -source a"eaJ, ;;{^riiin:'."];tiJr'glper.iencins a smar r erprobabil ity of o"tlg ,.l.orpassel uy'a given event. Thrs approach yierds aseries of zones radiatins- 99! rror"tr,e -sou"."- *au, thu *o." severe hazardsexlsting crosest to the itifis. -it ir,orro u. pi,'inito"'iut, however, that anyf;:::.[.ntn the extent of the rrnoui-ztne is suuieif to Jo*" desree of rockfail
o2) .Whether or not a rockfallposition or had been moved by
b:f-O_." La: i.e:ting undisturbed in jts originalnuman activities.
3) The phvsical nature of undisturbel,rollfgl.r.bourders with respectcontact, (restins on surf.a;; i;b;;oe1,,,na"tiarlv to"e"ed, etc.) andmoss, and weathering patterni on-.iposed surfaces.
to basal
lichen,
4) The comparative size distributions of boulders with.i n the runout zone.
Rockfal I Versus GI acial 0rigin of Boulders
In order to determint th.".extent of the rockfall runout-zone, it is necessaryto determine whether. bouldels enco-unte"ed below inL-.t-irt, in vail viilage havefallen from one or tne-iour;;;;;;;'and come to rest on the surface, or if theywere transported l:*ilo.-a"poiiieJ[v j.Jo"-o;;;iJ"o-uring p]eistocene gracialperiods' This disti.nction can le rnaae by comparing the character of bouldersfound imbedded in undi;tu;bei .tr;;tgt deposits ,uith itre' Hmestone and sandsroneboutders derived from the ct iiri- ii.ig.-.6y..--ci';;;.;j; deposited boutders aremostrv rounded to suuroiioi'a' ti*oJin"s1i.,{jt.-i1"rlii'*o.pnic
rocks wh.ich are'| m'edded in the sur.roun_dj ns- sl i.-iir .lq"t:t:. -ihu'-"*por"o
surfaces of theseboulders are almos-t totallviou.".a-lvith lictrens ano-'mls.s, making it dffficultto determine litholosv of :tt'.'Lb-riae"l niitibuf ii'Jr'J'.inspection. The heavyr'rchen cover and oJltti w-e11 deve-l-dieo surraCJi6"r'*"itnering features such aspits and etched rel ief oi i"Jiulo'u-a'iminerar grains suggest that these bourdershave been in orace for ?g'-i;'-+b"'tt,or.und -years. --in. glaciar.ry depositedcobbl es and boura3-11-1e ss to so-p.r.unt gra;tiiii-and'metamorphic rock types,and very few rimestone or sandstone cobbies o" uoria""s can be found in thetill. This is due to.tt" r.ii ttul'in" oniy-ror"J;-;;;. where varley gracierscould scour up r imestone ii i iiiii.o'w uana "oi-;.k ;;.- ml te upstream from therunout zone' The.extensive upper bisin whic! lp.rrJ the graciers is composedof Precambrian igneous and riritimoipnic Ii.t_ho1'ogies, which make-up the' vastmajoritv of the rdck.tvpei;r;;;;;;;id^in til-l _deposits in the runoui zone. rncontrast, large bourders ano siJs'or rockfarl-'o-r-ig-i-n.u". angurar or poorryroundEd, rest direc_tly on the _d;;;d rr"ru.i' do-'no't"rhow an equar amoirnt ofweatheri ng on ar r _".It9:..g surricls , and are 'ar mosL
-eicr
us i ver y r imestone or. sandstone. A few granitic roctrJr' bo_urders ;". ;i si' present, being derivedfrom till in the upper-source area. f4eie o#ri*r,*s were used to map therocations of rarqe'borra!"s--or-.illruii-;;si;';;i';;;.rmine the approximateI imits of the ruiout ,0n., -uJ-srrow-n'on
the map accompanying this report.
Disturbed Versus Undisturbed Rockfal I Boulders
0nce a specific boutder was identifj.t q:^i,.,.1S _9f,q.rgUqffe rockfatl origin,lts p.sition on the f.oot iiop.i-i,i.jid.be used to predict the nature and exrenrof the runout zone. , n p.ooi.-ni"iii,'i,ttng t-hl-p.iti'irri-of rockfal I boutders inrne subdivision and ad.1'acert ;;;;;-io. ielinehe iii"-"unort zone is that rnanyhave been disturbed and moved from-tfreir g"ts.inul iii-riijons during development'ncl sen5lpuction activiti"s. M;'r;"of.-the -uorio6ri'are
too. rarge (gftxSft,weighing up to l5 tons j i.;;; movli"ea.siJ-yr- €V€0 by he-avy equipment, and it isassumed that thev {.."e^.{oveq-oiiiy-I iew teet to seierar-iens of feet from theirortginal position
i1 -or!er to.u..y out construction of roads and foundations.lne-accuracy of thi-s, assumption'"ir-not.easily det#mined,. and the presentposrtions of the disturbed t;li;";; as indicafori- o?"'"unour zone and hazardzons sh6pscteristics is not ";'.*ry rer iabr", ino J, ,r.o accordingry.
-i0 -
Fn.:Sr-r Roc<f.rLL 8!-u3- ;) Et,l
aL oeR .4.ccKF,la L-
Bor',ia€ r!.
DeAr*'.'., o r.r
lNl corl gl sTf ,\r T
OlStl-.i,! iiorJS
EO<'nS FI bEP
^lo
>ttt! !'"'"t'J
G*l*,,r,C &:,-rcir+15
IN TILL
Fi9. 6
frTr€D)
wEn rircil€O
S<,*F;\<€
<.OLL(JVIU../\
'Tr-r-
:D Bro -4'--"RocK
Phys'ica'l differences between rockfal'l and g'laciary depositedboulders in ruhout zone. Rockfar bourderi are ari rimestoneor sandstone, while g1ac.ia1 bouiders are mostly roundeJ----"granite or_metamorphic'lithologies. Note that so:i eiistsbelow rockfatt bourders, whire-it is absent beneath giiiiirboul ders.
1',|
- Di sturbed or transported rockfar 1...b-1rr-1:1, al ways - show fresh gouges andabrasions caused by. heavy ea.ttr-mouing equipment. Addit.i onry, the moss anoI lcnen growth patterns,- if any, a.re not consistent. with the presentorientations of the-'bouruers, inii.!llns that.they have neen moved after thepatterns were estabj ished. -oisioioratio-ns of *," ,iiii_urueo boulders caused byso.i I contact can be observe-J-on'in. s'i des or top of those which have beenpushed over and moved' Tho bouiders often teave'tia.r'ls or marks where theyhave been pushed..,grqng ld.-si;'rij,..creat.ins i sruii berm of scraped up sojlalong 0ne of their basal .ed-ges.
'unoistu.o".o .olrii.il boulders do noi, showfresh gouges or scrapes, hav-e consistant-li;he;-Jnj-ro* growth patterns, donot show soir discororationt on tt,"ii lides or tops, and are often surroundedby young bushes--.aspen trees, or- naturar ueg"tatiori, which has obviousry norbeen disturbed' The'posili;;'; these bouloErs can'.bL useo to more accurateryproject the minimum'limiti-oi-tne"runout.zone, since they can be inferred tohave come to rest in ih;;; p""i"rt positions irie"-iarling from the criffs.FEi::i!t used To Approximate Ages and Recurrence Intervars of Major Rockfau
certain characterjstics exhibited by undisturbed rockfal I boulders and slabs inthe runout ron",,::gg1_1 upp.oiir#. o" reratiu. tir" spans since they came torest after failin,g,- a.nd !ive a rough. estimate oi ih. recurrence intervarsbetween I arge sr ab--'fal i ur;'!u..tJ. -rn" iontict -nraoe oy a bourder w.th thesurrace sussests how lons the roJ[ nl: l";l-i.iiiiid'in its present pos.ition.As the length ofjt-T"^ircreises,--ti,. ro.t wilr tend-to press into the grouno,and slope wash' soi.l. cree-p, and frost wedging.will act to fill in around thebase of the roik witn loil"'rJlitrit. noc"rs iniiir'rriv,e ueen sitt.ing for longperiods tend to be somewhat imbedded in.the soir, and if moved, wourd reveal anindentation in the ground. Rocks urni.n nuu" "li,.ntry fallen rest directly onthe ground surf ace , and may r i; ; ;;r;;' ;; 'r'rr';i"r''r."., they have crushedbeneath them' one can placi a iticr beneath the edges of such a the rock incerta i n spots.
0lder rocks also ha-ve more consistent lichen growth patterns than fresh rockswhich have recently oetactreo '-r"-o, the ctirt. irestr rocks may possessdifferentiallv weath!.eo suiiaie.','u, u result of their former positions on thecliff' If the bourder.qrir.d ;rirrru.. weathering and coror pattern while onthe cliffs, it is unrikeiy 6;ii to a. stop in the same position. and thesurfaces which were_prevrdusiy'Jga'inst .the g.i-ounu oi tacing joints may stil rposess a characterist-ic cotoriti-on contrasting with oroer exposed weatheredsurfaces' consideraole time -li-ni.essary for iaturJt weatherjng processes toremove this discoloration and;r;;i; a nEw uniform iurrace coror on the rock.' ]!::"-l"ltheri.ng.factors ""J-tn"-n-uture of undisturbed rockfail boulders wereused as a guide in determining hazard ronur'"i'ini;-;il runout area.
Distribution of Rockfall Events
Examination of the source area and runout zone reveals that two basic types ofrockfall event take pIu..' ln -i'hi' ,troy u".u. The trrst and most commoninvolves smailer ina_iviuuit'iori'j."r, generaily in the zftx3ft(0.5x.tm) sizeI9nge' which detach trom ieoit.tii.y beds and dventualry fail off the crrtts.tnese ralts commoni.v invoive ;";;;i.b*rl;;,;;;;?'which are set in motionarter being struck-by tn. iritlii"rui "ng rock. This type of minor rockfall iscommon and based on- examination oi'tna runout zone and cl iffs above can beexpecled to occur every one to three years. This is the type of rockfail which
-12-
'occuned
'I S mostandJ;;l
--o-in the sprinq of tgl3.glg..damaged several, structures. The areasusceptibre to these frequent 6venii'is shown on the Runout zoneudes the upper two rows bf struciurls,
wh i ch
Map,
The second type of .rockfalI is much^.1.::: Il:ty"nt,-but of.-far greater dangerand destructive potentiar. rt"'invorves _massive !tao^taitures of the cliffiii:ii,dllxt -r'liir"iii,t;';tUl:.'i*nr;j'td:fr,:tii.,,x,Jt.:i?:;,,llti;"ff;"1:i?:.J"i?,:,?1*lj.I.*:li ix{lit,ii: ""'i:"'ui*oit JL"tiiiii-rtsu,t
A rough prer iminary. estimate of recurrence intervar s for these r argesl ab-fail ure events., laiuo' oi-'u*#inution # tr,. 'iou-"". area and und.i sturbedrockfat I bourders in ttr" -"*r,ii;;;F, is on the ;;;;'. o_f 40 to r00 years.Large boutders ser -t:.T:.rj; a"*i1's"-ty,u9e eventi"ian'iiuu"r through rhe runoutzone as far as the maximum prouabid limit. -
nn Eiirui. or tn" rast occurrenceof this tvpe of event, nurJo;i1".'tresrresi', ,-,iiiiiJru.d rockfair bourder inlitu6'l3ilr'l!3: ano weattreiing piit."ns on ihe ciiiis, is on the order or 40
Potential So'l utions to Rockfal I Hazards
The- feasibil ity ol,^^n11te9tive. structures and other preventive measures wereeva I uated duri ng t-he studv' lt.'i*". lvqes
-oi ro.r.i.rnr' events di scussed aDoveilSfSrtonttoered separatelv, 6nJ'ioiiitii'r-roii,t.i"ii'io" oot, rypes are ou, ined
Rockfall Events Involving Smaller Boulders
smaller boulders
^.-o.*lonrJ falling 9If the 'lower cliff co_uld probably bearrested by protecti v-e stuctures "bui-l t near ii. 'r o".i acce rerati on zone onproperty within the.platt-eo subJirii-sion- it" .i"l"irres must be capable ofabsorbing the energibs ;i-;re ";.;'Lourders_
travel ing at 50 mph, and rvourdprobably involve.energy absoruin'g materials hero -*itr,in tinber or rockcribbing. Mainta.inenc-e- oi- tn.- ,i.r.tr"., wourJ-i" "n"..srury
each time aboulder is stopped., sin-ce-it'""en."gv a.issipailon niir damage or deform thatpart of the structure invot veol - i,t ii,nl"truiv ""r,i feasibte to build anarmoring vrail or other type or-strr.iu". "\i.h !titr;;; to arrest the bouroersthrough rigid strength, -due fo *. *^t"r.ry r,is-i-;';r;Jntum ro-cks gain throughthe acceleration zo-ie" rnJ uni."JlJao-le pattrs inu puii.rns folowed by rocksskittering down srope makes it alltl.rrf 1"0
jli*lr"i#J't'n. best praces to siteEne protective structures' One apiroac.rr wouia f.'-ti construct individualpr'tective structures for eactr-uJrrTin.o. wrthin-in'e *nort zone. Ar ternativery,a s.ingle large structure above irt.'rlrtoivision might.provide as much protectionand create less overall disturban."-io the area." rn?- itructure would have roDe carefully designed ano const"r-ciea to u.-r"uu'i"aining and to preventadverse snow or ice accumulationi ]-r-om torming above the protective barrier.siting a communitv type t";;;;;'ir; structure appears to be feasibre on theslopes 'immediu'"tu,.,ib_oye trre- upp-ermost row of' ""Jiaun..r, however, moredetailed siting stldie-s u". n.."riliy to determlne irre m-ost suitable location.rn e'lther case, costs for t-hese iirir."trr., are prer iminarily estimated to be ontne order of 0-75 to on€ miilion-ioiiurr, and couid run higher. unfortunatery,!hese structures rg.,ujd Jo u'tti."io"q1..._u_.nt. larger bo.urcrers or srabs derivedtnrough toppl inc fail.ule-i, i"or"'iur"t""Jying struct-ures in the runout zone. Theenergies possesied.by such staul-or i-ourd.ers are simpry roo great to containl::?;:r:!!. resrrictei space- uur-iruur. between the souice areas and existins
- IJ -
Large Sl ab-fai I ure Rockfal I Events
Due to the crose proximity- of str!g!u"sl to. the source a,rea, the steepacceleration slooes,
-a1! tire t#ge-iizes o_f_uouioeri-ani slabs involved in thistype of fair ure, there is no "economicaily-;" -i;.;;\car-ly
feasibre ,ay toarrest ' def l ect ' , or stop rour i;'i.-l trl. -t,i,r4;;."9" s'rabs from fruver ingthrough the runoltigl^.,__Tg oestrovils structures, which happen to be in theirpaths. A conservative estimate oi'tne energi.s r,i.t,'lorrders are expected tohave in the upoer. runout zone is apprilimaied rv tn" .rmpact of a r0,000 rbtruck st.i ki ng 'a
:'ry:tll: ;;:; r-;g"? 'or iqo-mph. -'0.['n'
ve structures capabr eot stopping l0 ton rimestone uouioers-yavetifig-un-!"iuti., unpredictabie,pattrat up to 70 mnh
^a1-e tectrniiJtiJ'ana econofiiiatry infeasibre due to theextremely limited space available- bet-ween trre sourc'e area and the structuressrtuated in the "lnlyl zo!e-.-.1i.,. .r1r;;,Ii; ".ri""=ru'trve is to prevent thebourders and sr abs from far r ing;- -o "tnii r; ;;ii"f" _u.."orpr ished throush:il??:l'" g;:il':s,'3i#;*.",iyti;il'fgy:"iJ*;,:'.0,'ry
*,'1,:irir'.00,",,;,,.11:
[ ; i I i i i'; J-',.,if , ll: ?i: *, :l!, "*,,"j, *,.'t T #.#jI ll;;r ;1.:u oi t i I I i n, Bextensive mesh'ino ?!q dunnife ui'pi i."ition to stiuiiiie-tne-c..tiirs suriicientryto al low rock-boiting operation's'. Ai-ces_s to the cl irli would be diff icult, andcourd invorve he'Hcdptli ;!;;;;. ""pr"irrin;;y-;;;i;.r-es
sussest that costscould run on the gfo."" #'i;;-io .three mrii io"- aoi ,u.r, considering thernsurance which wourd bg needed, uni u," prtl'iii;i"fr;;;?:11""...f"r"1"r:t"1s_which courd arise. Another.onrio""-uu*'i, il" F.oi-".r'lii[ff:.Tl:]i:;:;l;;of the area, which 'inc'ruoe;;;; .-r'iir source are!!-.' o'rturning permission andlegal jurisd'iction- to al low lit"-nliu" modificat.ir; .rd remedial work on thecl iffs may I iterat tv requir; ;;;j of Congress.
Cl iff Scal ing
cliff scaling was considered, but after e.xamination of the cliffs and positionsor structures in the runout ione berow, r.t was aeemeo't-oo dangerous and risky.There is a hish probabi.iliv tiili *',*6ive oamife'io rJu."ur structures wourdresult from dislodging bould;;i," liuor trom trrt sori u-e.tical ct iffs. Scai ingis senera'lty cons-iaei"o -i.Jriui; ";;it ,jr,"rr "iii.o ,;";;" to construction orl3f ';l:T:' t; il #. ;i"l;,, Ix?
o;Tf.T ii,*$*ilii;;' il,ii,t.,.t, "es i s us u a,, y
Snow Aval anche Hazards
several relativerv smarr snow avaranche tracks exist on.the sropes above thesubdivision, qs s-hown jl--frln )i.."t.v u;;;.;;;; wy ,-ur1 which seneral.ly:;:il?":;i.:n;.:?'i"' cr iff un'o .6no,.t 'ilo'trl ;;i';;"iJ" avaranches durins or
e i ; i i il ; i L o",,',"i1'1i1'#t Ii ",:1. : lil,"::!t- il::i *j ll.ulsl, f ; l l ; ii: i:structures 'are qenei_a-lrv- noi- i'n-i#'puths of these minThe danser ot rdikrarr iar-exc'e.or'ir,. concerns ro,. uuu!ln:;:l:r.n" sulrevs.
Concl usions
Rockfal I Hazard in l.h: rlyOy.aleq is considered to beevenrs can general ly be d.ivioei-inii, iwo- categories;toppl ing sl ab fail urps - of the iiiti Taces, and ?)rndrvidual boulders tat t ing 'of;'i;;
edges of thecownsl ope creep.
.extremely h.i gh. Rockfal IrJ those involving massivethose invol ving smal I ervertical cl iffs due to
-14-
t'i/l{{,i1.\(\\\\'Nill/l
rAaEA oF -rHrs
STUOY
Fi ^ 1. tg. t Snovr avalanche hazardtnree srna I I avalanche
r nves ti ga ti on.
;:l:;,'1":1i:,:;i.i"'if;l TiSl';r'?il?;
- ls -
l] 9o.rtders and sl abs shed downsl opeor 4 totb io;; i,ii-,'-uy t-i ;;;;;ii;,; {q"i{ilqTlt,,lg,.l.llT,iir"Ifirll tlE i;i:irunout zone, where numerous resideniiar sl"u?iur";';; i-o-c_ateo. It is thoirghtthat events of thi s. natu-r-e probabr y o-1.1r-. tugry .4q- to 100 years. It i s noceconomical ly or technicaily'reJsiut"e to arrest,- def r eit or stop rocks of th.isslze in the present .physiial situatjon. rne-oirv-uri."nutive sol ution is toprevent toppi ins faii uies bv securin,s l!i :oinl.l' ul-,'rtuute
-cr iffs throughwr remesh, gunn ite app r i cat i ori, ino rocr<-uoi tl ng iliin'.6,. costs- _for stabi l i zi ng;l;":tiffs above the area *ii "ui ui'nigh ,i"tni-io-iirree mirrion dorlars or
2) smaller individuar boulders fa1^r ing off the verticar criff edges are:;::[:tL+ .Jb tfo'
;Io"-1,-or soo-to rboo rbi ;;; u". .*il.t.d to be trave]ins at
rbc kr a r l i ; ;o;
iX # dl#.i, "&'0..:,,.T d:::, I i! li "illi;, ;'lf;iii: f ithree years' Nost,*aie_.t-riJg."'.d.Ti.,1nr.quu.ily. extreme weather conditions orground motions- I.t appeaii p"bnait^e that inese i.lqu"nt events mighr becontrol led throuqh. ttre ibnitrrJtio;t of e-nergy-absorbing protective structuresbui I t on the .ro-oL: j.:li; ;;;;;;;;l'_ sucrr structures viout d have I ir1 e or noeffect on iarqer bourders aei^iveo from toppling fairures, costs for several;:i;";:'11".;,liiJ;tjJ:;:_..,[1ti,.t,""'i"" .-,ti,ii.d to be on the order or
Rockfal'l bourders,at the-base of steep sropes in the study area were examinedand used to map tne rimi[i-;i;h" irnout zone ano-aerineate severar hazardzones ' Di sturbance. of many roctial I' boul o""i"..ui'u. l-i rrr cur ty i n accurater ydetermin.ing the maximun "ri.ni;i;;; r.unout zone. Ail areas within the runoutzone are subject to significant though varying amounts of rockfall hazaros.
Recommendat i ons
This preliminary rockfall hazard study is not intended to be a technical designstudy, but rather ,1 p,r.er iminarv e-v'a-r-uation of_the magnitude and extent of therockfal I probr em in the eoofh" crl"l' .""u. If rock-bor ting and securinq thecl iffs iri the source- area 'is found to be eionomicat ry or techniial ryinfeasibre, the dg:lri"l;t "i.t'r,? or not to buird protective barriersdes igned for smalle.r, more frequent eventJ ,i,.t-iL. made. This wil I bedifficult, because tt"r" siir.ir'J".''!un not be "*p".t.o to protect residencesrrom rarse srab rail"l::i.;;;;;;;i.;ly t!o_r" ;;;r-;;;n-s on the hisher criffsource area. tn tltt-.lt^n!r, .tn"
-corisroeraure
cost of pi^otection from smarlerevents becomes djfficulf to' jrsltt-y'.-
If construction of -p:1.:tive structure.s j-s contemp.r ated., we recommend that anexperienced civil engineer -or geotethnl-c:i *gl*jli", "rijiled jn evaruation ofdyndmic aeoloqic Drocesses ror ieiisn"cr,iterial_ue- reiJned to conduct detaiIedoesrgn and sitino'studies-foi tli-ii'rrctnqlsJ'fri';*;"t shourd be used as a:i;::. to pran rurtner iiua-i'es "o=r"!p!crrii- p"oiu.tiil-r.rr.ture des.isns and
t-t7 - ,Q4
---D;EE-
Geol ogy Secti on
Ensi neeri ne aio iru iliJ.,ii.tl
- 16 -
/ - 17 -E-4{F
??J
:.
Refe rence s
Mears' A. I., lgTg..cororado snow-avaranche area studies and guiderines foravaranche_hazaio prinningi"-d.T;: il;i: i;;;.i';;;1. pru. 7, t24 p.
Robinson, c.S., and_Associates,_Georogicar consurtants, I975, Georogic ..,i:i:;:ryrs ror environmeniir -i,a'iiio-:,;;";;,iii;;:
Easre county,
R-ogi::.: I:l': ei u]: 1974, -Guidel ines and criteria for identif ication andland-use contrors of 96orogic triiiro ana ,in""ir'iuror".. areas: colo.Geot. survey Spec. pud.-o,"iio"pl"
Shel.ton.,_ 0.C., 1974,
Unpubl ished report
Col orado.
Tweto , 0gden , rnd igugf t,ng, T:1. ,- 1977., Geol ggJ of the Mi nturn l5_minute3:;:i'!tl:'eut';le ano iummii-io,ii.r,-coi6i,uio,""[.s. Geor. survey Fror.
Rockfall: variables which determine the hazard:, colo. Geol. survey eeoiogi;-h;;;;; files, Denver,
- 17 -
BOOTH CREEK ASSESSMENT SCHEDULE ]-
Ohrner parcel Owned AssessmentIqara crasis Bossow Block 1, I,ot 5, Sf8-fr-a
Rodnie W. carton Bl9ck L, I,ot 10 $1g ,63-t.34Lynne Erion Unit B, Resub IJot 7
Roy A. Johnston Lot 1, parceL B, 9191632,34Resub Lot 2
,fohann Mueller Block 2, Lot a $tg,637.34
Brandess-Cadmus Block 1, Lot 10 9181637.34Real Estate, Inc Unit A, Resub Lot 7
George H. Clowes,Jr Block 2, Lot t $rg1637.34
Crown Corr, Inc. Sloci( L, Lot lj. 91g1632.34Resub Lot 7
Robert S. Carpenter Block L, Lot 2, 9L8r637.34Unit A, Dtarquez Duplex
Daniel J. & Barbara Block 2, Lot 2, g18,532.34A. Feeney Unit B
John I{. Gray Block 1, Lot G, 9Lgr637.34unit B
J. Edward Gund Block 2, Lot t $tg,637.34
Edward M & Katherine Block L, Lot 2, 9Lgr637.34P. Gwathmey Unit B, Marquez'Duplex
Jeaninle Hallenbeck Block 1, Lot 4' g18,637.34
Patrick G & Suzanne Block 2, Lot t $t8,6g7.34E. Dauphinais
Robert p. Lanmerts Block 2, Lot 4 $1g,637.34
Robert.Leavitt Block-Lot parcel A 91g,637.34
Duane & Carolyn piper Block L, Lot g, Sl-8,G32.34Parcel B-1, B-2
Brandy Lee Mclaughlin Block 1, Lot 6, 9L8r637.34Unit A
Jorge A. and. Sybi1l Block 1, Lot 9, 919,637.34Navas Resub Lot Z
Paid
$ 2,2o5.77
I 2,os7.zt
$14, l-06. oo
$l-4, 106. oo
5 2,O57.77
$ 2,O57.77
$18,637.34
I 2,O57.77
$t B, 637.34
S 2,os7.77
$L4,106.00
I z,os7 .77
IL;
I'r1J
o
,J
Page Tlro
.fohn Galt Block 1, Iot g, g1a,637.34 g 2,057.77Mountaineering parcel it, Resui lot- )
I'tichael D & Cynthia BLock t, Lot t $18,637.34 12,Os7.77R. steimle
John D. and Ruth K.Steimle
Ray E. and panela V Block 1, Iot a $rg,637.34 $14, 106.00Story
Garton Deveropment Brock 2, r-cL 5, 918,537.34 g18,83r..37Unit A
Garton Developnent Block 2, :-.,1' S, g18,637.34 gL8,B3i_.37Unit a
vail Mountain school Blost 2, Lot L2 $L8,637.34 g14,106.00
Jacgueline n. Lind Block 2, Lot 2, 918,637.34 $ 2,052.77Unit A
\_
Nov-25-e€i osiosP ENGI|SERING c}EsI(iNvtf(rRFis o€l7o
ENGINEERING DESIGNWORI{S. INC.
97 I - z+905 P. 01
P,O Box 775729
i0965 Moffil Av€nue
Steamboat Springs, CO 80477
(970) 8794E90 (Phone)
(070) 87er9o5 (FAX)
P.O. Box 927
Itj50 E. Vail Valley lJnve, Suito 3C
Vsii, CO 81658
(970) 476-4855 (Phone)
(97O> 416-7652 (FA-Y)
'lotal Number of Pages:3
FaxNumbcr: 7Zo U-71 zy.fz
Projea No.1621a t
RE; EI\l) &UrLtF lUnor-S
Comrnents:
FACSIMILE COVER SI{EET
Date: tlzg lqa
-
Attn: RuqthLL l\t!!re?,T
.-ro:=r-16
(]s:osP ENGTISRING DEsrGNwoRKs
.
ENGINEERING DESIGIYWORIGS, INC.
tf €t79o97 -2t9c,5 P.OZ
illF]/Ebtc. lEYYlS-F.E-
Cahtnb8t t UnivrdtY. CltboFot'tld
Elsodol"
ElFLOYl'lENr1€ftr|.fi
rs7-rg
lslg
ffiEr@r
srFto\fiEilrtSAPt*rrt
l*lSt .:'.iflo'}tg
..lgxr'
'li''
EFFyuEqanE
. :..r'c|ltorflrOr tlorurlldrl ftlhnso
eAGoogFt ttryaEqe,aoftr
iLBA-Ftrnct
ENclftlEEFlil(lDE9lcttfrOHl(E lilG, Srrrntoa Sptnsr. COFtrrcr {enryr, ^ftF_EFq lrrilgrrr dlgrrpreow oF lIBttllAT tfHtitc8
B.9-frlEnghsitg
$rron Urtlg:rv, Elalrfil. HsitrEABuinsronrroon
Et{GlNllf,ll,lgiE Egl(illYVOFlGt lttlc, glstnbd SF'!F CO
E;G€ulEilfo gnCrr*' *uasrd dctgt snd rnJFt cotlstt'? pten gnn'tdn $tEiltd
srn|EDtoilrtilrlxt
Ets-r<mdorbwen oF cl{|cAcct. zr|ts, CAlfratnt arr comarynsr at corrudct d tl[5 mllon hyurnrcrc goiet
(.!tlJdt o3t? f msiprlloat |ltd et!3 Ffrtulltdd ilrJ?tr$ron lln]i
UtallrBgTrFOlJl{DATfOH GSu. Ctilco cl
ftlta trrFct ggt,Pttl€ffi trdtbvdurt attlrrlt cJsvhafu dannpmrt scsnathB
Cddo ffi utfts*y, -|gt dh* CO.
BS. urcrursE1rrrlE
. ...,1,1 .. .
EilohtEEF|]rfiloffitttuuoHl€, lltc. surtdsn0r, cg
SonsEngtrrgr. ssgn 3lllror. nt e udlclon gsrsr. f trtrtqltrlr.
ui|mD srAfEg 8unEflt oF REcl.AilATroil, o*ttfi cclllxtaEnElr. ct$rdfll|f,irr sE t{rvtril|lilt3 qaiSom. ftdht$lot
ardOna spnciEjinqtsso|r Lllgp snrfig,rffi ptotGN* CnurAzal FfDig,Ariiun*tenrr ftEiEfi, C.|El vdd fr!||c. Cr3- lJtJl aqG' SffiiurP'qc,nfui& nodt Forx.rFl, UpF.. sftrx!-fhrd FIoFET, FE|tsSat Mlrul eJn ?roic,
fEq4!* Frrr op!'t||t Adniffn Arcy.t,9||FnSC$tt1G' k*h CO
lFqEr. ffi!illE dEcdrrn|llon stffi & *Uqr
OLOBETTCTTTAE gitdt{EEntMi. fibeEc rLTcotrdchnfEtrrgfAtdh", gdib hou$d fu*al ssny etEtr pnli*
-
*o.r;4"-t6 oBrosF ENGTTERING DEsIGNhfclRt<s
ENGII\IEERING DESIGIYWORKS. INC.
97Cl A79-d[906 P.OSI
CRAIG E.IRTTHSEN
Forfil Unhreciryctl{iltb|d,WrtrHartbd,CTErlrrcdon B.S.MrchanicdEnghredng,zurnnuqrtnlaude
ET,lPKIYilENTi$ttPngrtrt EI{GINEERING DE$GHWORKS, ll{C., 0tcrnboatSprngl CO
Judor Engimer' drdldng and tsttical arlirtrn€ for strllcilJd, rflicfiEilcrl
rnd civi| proir€t3,
j
ll.
*"+- AI\D EIvno{r,tE{TAr-, 6&4rsslol
A@.IDA
Februa:ry LI, 1980, 3:00 P.M.
f . ) Approval of mlnutes of Janr.rarly 28, 1980 rBeting.
2.> Prefiminary dlscussicn of Devel-oplent PLan and Iot Ljne Vacatiqr nequestfcn Sjnba Rrn Condqniniurn Project located on Lots 6-9 and a portion of 1O,
Resrbdivisim of Bloctr C, Liqrsridge Filing No. 1.
3. ) Approal of Suruood Condcnrinirn Map. (Located in East Vail)
4.) Setback Variance to aIlw an rndergrourd garage on Lot 10, Block 2, Tajll'
Village 13th.
5. ) A1ryrorra1 of a Plat lfap for Vail Colfcor.rse Tcmnhms ptrase I
Tlo be pulclistred tu the Vail Tbait m Febnra^rry 8, ISO
Nott Residence)
lfeilers Present
Roger Tilkeneler
Ed Dmger
Saady Mills
Ibn Corcoran
JJrn tr{organ (cane in drrring Sirdca Rm pres€ntatlm)
Staff Present
Peter Patten
Ctuct< Donley
Dick Ryan
Larry nsnritn vas in building and ariailable if nee&d.
Bm Todd, the corlrcil person assigned to the neeting uas at a county ueeting.
&l Drager crraired the neeting in the absence of c,erry wtrlte.
Iten #4 vas talren first.
Variance for the No!! Besidence to allcry an urBlock
PI.ANNING A}ID IIWINCNMSTIIT CCMMISSICT{ MINT'IES
ldeeting of 2-1I-8O !
discussion of
l&nhers Not hesent
Jack Goehl
Crerry Uhlte
4.
Peten Patten e>rplained what had happened. at tbe two Design EeviarBoard Itbetings since the last prc rneeting.
Roger Tilkaneier rade a rction to approve lhe setbach varlance for theNott Residence to allow_an r.nrderground garage on Lot lo, Block 2, yal]-viuaee 13th. sandy Mills said ihe vnur-a s&ona the rnoiion but iskediJ the plans are ncm acceptabLe to tbe neiglibors. pe-ter o<plained thatrepresentatives of the neigbbors had been p:resent at the DRB neeting andtbat l,lrs- Nott had vorked with David Peel, the MulLin/Serafin ar"chilect,
!o gatilfy everygnel Pe-ter also explained that this rrust go to tbsignReview_Board agaia fo-r_finar approwl. Ttre vote was ta-kenl Ed Drag6r,Roger Tllksteier, and sandy Mi11s rioted for ttre approval. Dan corroranabstained. Jim librgan had not yet a-rrirrcd. rtre 6tion passed.
Itqro #2 cas taken next.
2.t Plan and Lot T,ine Vacation
of 10
v1s]-0n Block C, Liqrsri
Tbls- is_6ply a preliminary discr.rssisr of this item. official pr:bricatlanof the RrlrLic Hepring on this itqr is for Tebnra:ry 25, Iso.
Dqpa Tor€hi11, representj.ng the Developer, introdrced the architectsand rechanical engineer for the project and gave a brief history oftbe pnoject
rJ / tlJJtll|,t'E' Lrl- Z-II-.'U
PaeB 1\ro o
Dlana e:rplalned that lhey have planned 119 unlts plus lg erylcryee hcusingP1t9. originally only I0 enployee housing urits-rr,ere planned becar:se t6at.is wtnt tle zoning required. Ilorever, the staff t,eqnesied that addltloraleryIoyee housing unlts be added if posslble.
,Ilm hiner and Ga:ry Sveti$ gp.ve a slide presentation of the koJect.
the Board looked at tbe rcdel and a.sked qnestions.
E\rcryore agrced tbat they strculd rcr:t< to furprorre tbe bus stop area.
lteu:e were questions raised about the height of bulldlngs. Ttre arrcragebeieht is 45 feet vrith tbe higlest building being 60 f;!.
lte Board discr.rssed tbe location of the tot 1ot.
Tbere was a discussiqt abqrt the potential o$,ners of the units. The derrelopersfeel thev will harae the sare kind of buyers that they harie at the Spa',11r:.ctr ispeoryr9 nho will only be spending about six ueeks a yLar nere. ttrere wiu nea miniwr.p of short terrn rentals and very few cars partring there.
Jin lfio,rgan expressed a conceqr tlrat he thiJrks that the derrclopers areassming t!q:t everything ls going to be tbe sann as at the Spi and bedmrt think this can be assrrmed.
Tbene ras a disoussicnr about encorrag,ing develogrers not to build to theirE dnln. Diana said they had not built to their rm:<irn-m m tbe spa; trrybullt 55 units wlpre 98 were allcned. Hoerier, tbey feel they need-tobuild to the rn><irnlm in this location. Dick Ryan siic aornrcning wculdbave to be done before derelopent plans are niorgnt in or pLannEd.
Ed Drager asked abqrt cutting dqm the size of the buiLdings. Ton Bninersaid they had reduced the height as roucb as possible. rh.v had ended w$tl_!l" Pytl$oe" mrch closer because valltHi is 18* teei on tbeir propenty.ne reets the tlrees will hide a gmd portion of the project.
there ms a dlscussiqr of the landeaping at the spa and vfiat had beenpresented to the mB abcnrt it. Diana said that should not be brorghtt4l ia regard to this project. *le also said they had been rniseprewrtedat the Desigrr Beviw Board.
saady Mills said stre wculd Like the Torn cor.rrcil and Design Revierw BoaJdto be notified that this wilr officially be disussed at ine February 2s
Tfjl"g s9 thal anJone interested could attend. and therefore, no! calseprobl'srs for the developers later on. Everyoe agr"eed that it would bebest not to shrffle peopt-e back and forth between-boaxds as has beenhappening lately. sandy ashed cathie to see if a notice could besent to the Corncil and DFts.
PE Minutes of 2-11-8O
- Page fhree
Joe Lsandcr.r,ski asked if tfrc enployee housilg would be a'dormitoryor indl\ridual aparhrents. CaJ:ir S\Etish said that ttrey trad originally
planned ten tno bedroorn apartrents. Itrouever', the staff requested that
tbey break up the units making scrre of thsn studios, sosp orle bedrnocns
and sne tqo bedroons. They have not increased the square footage but
have changed the units frcro ten to eighteen
Joe Lemrando^cki asked if the arployees uoutd be able to u,se the arenities.
Diana said theV rpuld.
Jin l4organ asked about public usge of the anenities. Diana said ttrey
scrrld rather not have thern cperi to the public but q'iLl rcrk with the
llcrryn to do what they are required to do.
the access roads rere dlscussed.
Kent Bose had joined the reeti:rg so Ed Drager a.sked hirn abotrt the roaduay
system i:r the area. Kent said the vtrole roaduay systern in tbe Lionsridge
area is inadequate and beccses ncre so as the density grors. Ttre whole.systa will errentually harc to be upgraded.
It was pointed out that the official ptrbllcaticr of the item ls for
Febnra:ry 25 and rrotj"cms for prelirdnary approval or disapprorral will
be nade at that tinp. Diana said they wculd be prepared to do their
presentaticn a&in.
Item #1 vias discnssed at this tine.
I.) Aprroval of the mirtutes of Janr.rary 28, 198O nreetjng.
Sandy Mills said she had a questicn about the sentence on the Itlarvin
Sinu issr:e. It rcads, "At first tbey had a three foot loft approved
tnrt added five feet and had them approved that way.'t Sre does not
think they were approved that way and wants it to read tbat thry
rere built that way.
Sandy nade a rnoticn to approve the minutes with the one abore
ee<ception. Roger Tilirereier.seconded. The vote was unaninrc-us.
Itas # 3 and 5 rere dlscussed nerrt, plus sorc additional plat mps.
Golfcourse Tovnhcres Phase f Plat ldap
Roger Tilkenei.r nade a rntion to ap4rrove and sign this plat rap.
Sandy Mills seconded the rption. Everyone voted for approral with
Dan Corcoran abstaini:rg.
Stnwood Cmdoninirm Plat ldap
Roger Tilkemeier nede a nption to approve and sigrr ttris plat map.
Sandy Mills seconded. The vote was unaninDus.
tl
I
lt
ll
ffiHS* of 2-11-80 O
Pitkin Creek Tovn@
Sandy Mi1ls nade a rptiur to apparove and sign this plat rmp.'
Dan Corcoran seconded the motion. Ttre vote was tmanirlplls
the Board tben brought up srn qlrstions theV trad.
Ttrey requested tbat the staff write a letter to the Val1i Hl developers
reqrestine tbat they finistr the stainiag and painting and landscapirgthe as soon asi possible. Cathie said she rcu1d talk with Jin abouttt.
The Board rnas rqnladed about the 2:30 reetl-ng Trresday, Febnrary 12,ritn t,be Corncil on Zoning cbanges.
Roger Til.kereier asked a favor of the Board. Ee explained that the
Fonest Serrrice is meetiag at 7.n P.M. on ltrursday, F$ruary.14, to
disguss u,ses of the land at Meador MJuntain. Itre omrs the 1ivery operatim.tbat has been operating there for years during the swner and asked the
Planning Ccnmissicm to srpport that use there in the form of a letter to
tbe Forest Service. Jim il4organ rade a rnotlon to have the Staff put a letter
together to send saying that the PEC $sporls the lirrcry use at l&eadcry ]dormtain.
Sandy Mi1ls seconded the rption. Ihe vote wa-s, unani@us. Peter Patten said
be wcnrld draft the letter the next day.
Sandy Ml1ls asked, Peter to check on the uses tbat were penritted at Potato
Patch. Sre and several otber rrenbers of the Board tbCIrght tbat tbe restaurarlt
tbere uas to be a sg|q'Il hot dos stand tSpe opeatiqr and tbey are nour adtrertisingfor fuLl tine chefs etc. Peter sald he wsul-d eheck cm it.
Jin ldorgan asked if ther"e is water for the Sirrlca Rrn Project. &l Draeer
said the way they are phasing the project, the Tfater District wi1L be readyfor them. Ttrey are in the pllcess of r4pgrading the systan.
Roger Tllkreier sade a notion to adjorrn the reeting. Sandy Mi1ls secsrded.Tb vote was unanircus. Ttre reeting was affourned at 5:20 P.M.
Tbe Board stayed for aa inforrrel di*ussion for a few rcre rd.nutes.
*OUO AllD E{\nnCEIMEI\IIAL mMISSIC||
* AGE'IDA
Fdru:ry 11, 1980, 3:00 P.M.
1.) Approval of mlnutes of Janua"ry 28, 1980 reetlng.
2.> helimi.tury dlscussiqr of Develogrent Plan and lot Line Vacatlon Requestfe Sturba Rrrn Condcniniun hoject located on Iots 6-9 and a portlon of 10,
Regrbdivisio of Block C, Llmsridge Filing No. 1.
3.) Approval. of Srnrcod Condsrinirm [tap. (Located tn East Vall)r7,\4.) *tUact Variance to allow an rndergrcrrnd ga^rage on Lot 10, Block 2, VaiL---TiUage 13th. (Nott Residence)
5. ) Approval of a PIat Matrl for Vail Golfcorrse lbrynhqres Pbase I
llo be ptiblisbed in the VaiI Tbail on Febma.ry 8, 1980
it
t O Mm/TRANDIJM
10: Planning and Ervjrqurental Ccnmission
FROII: Departmrt of Ccmr:nity Derrelopent
DAIE: 2-8-80
nE: Nott Besidence Undergrorxrd Gara4eIot 10, Block 2, Vail Village 13th
the Desigrr Heviq, Board reviwed tbe pncposal for the Nott residence
urdergrormd garage on Febnrarry 7, 1980. No official action was takm
but tbe Boardrs reaction vns favorable.
the Nottrs next door neigtrbors, the iltullins (Iot 11, Block 2, Vail Vill-age 13th)goposal for an undergrourd gara€e receirpd final appr"oval (4l-o). Ttreir desip
called for featbering back the road ctrt along the ccmon properf ljnes. fire
Notts bave lncorpor:ated this i-nto their proposrl and they will be responsiblefc mtching the lrtrl1i;rs contours since the two sr:rveys do not m.tch exactly.
lbe Design Revlqr Board favors the design concept for the garage, but they
request that the Notts ccne in with a final proposal once the Ptr gives its
alproval.
Flr-
--,
-Project Application
Proiect Name:
Project Description:
Owner Address and Phon6:
Architect Address and Phone:
76 - 3 ::ca
Legaf Descriptio n: tot /A , Block
Zonel.
Filing t/lrc&
Zoning Approved:
Design Revlew Board j- 7- [0
Motion by:
Seconded by:
APPROVAL DISAPPROVAL
Date:
Zoning Administrator
Date:
Chief Building Olficial
:
Profect Application /-; P- 30
Proioct Name:
Proiect Doscription: _
Owner Address and Phone:
Architect Address and Phone:
t^ "1 \fVrqrqn,Legat Description: Lot / v , Btock Cf . Fiting ,t ' r .-,
Zone:
Zoning Approved:
(.*,
n Revlew BoardrtoLr-/rfO / - s/-tcs
Motlon by:
Seconded by:
APPROVAL DISAPPROVAL
Summary:
Date:
Zoning Administrator
Dat€:
Chief Building Otficial
'; r.
TO:
FROM:
DATE:
RE:
IIEMORANDUM
PTANNING AND ENVIRONIVTENTAL COMMISSION
DEPARTMENT OF COMMUNITY DEVELOPMENT
January 28, L980
Front and Side Setback Variance Request to construct
an Underground Garage for Eve B. Nott ou Lot 10, B1-ock 2'
Yail Village 13th.
DESCRIPTION OT VARIANCE REQUESTED
The applicant wishes to construct an underground two-car garage encroach-
ing 12- feet into the westeru side setbaek and approximately three feet
inio the front setback. The applicant feels that bullding the garage
as far west as is possible is the most advantageous due to the preserva-
tLon of numerous trees to the east and for safety reasons (avoiding
poor sight lines to the east from the curve in the road).
CNITEBIA AND FINDINGS
Uoon review of Criteria and Sindings, Section 18t62.069 of the
tabling of tiie requested Variance based upon the follcirding factors:
Coasideration of Factors
The relationship of the requested vdriance to other existing or
potential uses and structures in the vicinity.
Tbe adjacent lot to the west was recently approved for the construction
of a duplex. At the time of DRB submittal , it was unsure whether or
not the parking for the proposal was to be underground or surface. Since
DRB can only look at one plan the surface parking proposal was cbosen.
Tbere was considerable discussion regarding deslgn considerations for
the parking solutious along the north side of Bald Mountaj-n Road in ihe
immediate area now under consideration. The feeling of DRB was to work
toward a design solution which woul-d avoid a continuous stri.ng of garage
doors right off the road.
The Department of Community Development wilL be receiving within the
next few days a resubmittal for the lot to the west of the Nott's for
underground parking garages (one of tbe original proposals). IIe feel
more study is needed at this point to r,vork toward a unified design for
these two parcels because of their impacts upon each otber.
uniformit of treatment amon sits in the vicin or to attain the
ectives o this title without srant of s rlv1Ie
NOJI Veriance
1-28-80
Page 'r'wo
Enforcement of the fifteen foot setback on the west side of the
property line would necesSitate renoval of several Aspen trees to
tnJeasl . We feel the saving of trees and natura] topography on a
site is good reason to grant a variance. Ilowever' upon site
inspecti6n it was noted that a 12 foot variance nay not be warranted.
It ippears there is enough room to reduce the side setback varj.ance
and still not remove any trees.' This should be investlgated.
Tbe effect of the requested variance on light and air' digtributionic
ffiities, and public safety
Although the sight lines are poor looking down the curve. toward
the eait, it does not appear lhere is ample area to construct a.
back in so that backing 6n to the road could be avoided. Siting
in. gr""ge as far to the west as is feasible alds tbe safety factor'
Such other factors and criterla--4s ttre coqmission deems aPtrll
staff feels that in general , underground parking, weLl-designed'
is a superior soluti.5n to surfact parking. The proposal will
complemLnt the site by retaining uitural topography and vegetati-on.
FINDINGS:
Tbe Planning and Environmental ..Corutrission sha11 make the following
findings before granting a varrance:
That the grantlng of the variance will not consititute a grant of
special piittfteg" j.nconsistent with the limitati-ons on other
properties classified in the same district.
That tbe granting of the vari-ance will not be detrimental to the
public beilth, sifety, or welfare, or materially injurious to
properties or improvemtns in the vicinity.
That the variance is warranted for oDe or more of the following reasons:
Tbe strict or literaL interpretation.and enforcepent of the specified
regulation would not result in practical difficulty or unnecessary
phisical hardship inconsistent witn the obiectives of tbis title.
Tbere are exceptions or extraordinary circumstances or conditions
applicable to lhe site of the variance ttrat do not apply generally
to other properties in the same zone
The strict or literal interpretation and enforcement of the specified
regulation would deprive the applicant of privileges enJoyed by the
owners of other properties in the same district'
G't
htlrnce
futr
Ie rEcornnend tabling
a^ud adequately solve.grolterty and the lot
this request so that tLne
design problens oceurring
adjacent oa the f,est.
is allowed to etudy
between the Nottrs
t-.r
Planning and Drvircnnental
,l*irrtrtes of lbeting of 1-28
PaSe lhree
Dan Gorcoran made a nntion to approve the Conditional Uses for Cqnercial Space at Pitkia
Gbeek Park, Inc. as per the Staff llm dated. l-24-79. Sandy Mi1-ls Seconded. Ttre vote
m.s umnilorls.
Ed Drager said as long as Councilmn llil-to is ncn' presflt he wculd li-ke to a.sk that
consl&ration be given to a gas pLql jn tbat area. Bill Wllto said the CannciL is
agafutst a gas station out there.
4.> Enont and slde Setback Variance
Nott on lot
Peter Patten explai:red this itsn. Ee said nnre study is needed betfieen the
cnners, tbe adjacent cnners, tlre DFts, and the arctrltects'
San4t Mllls a.sked if rle have enougtr inforrnation or need mre. Slce said
sbe feels theie is defjriitely a need there for this type of thi:rg.
Feter eplaqred that DRts has not lookded at Nott's proposal or rnderground
parking on the lot next door.
EVe Nott sald she canrt rirery easily uork with the nei8tibors as it is a spec
buse.
l[r. and Mrs. Serafia said tbey are the crwners and it is not a q)ec bouse.
Eve Nott said the undergr"ornd garage muLd be like Gordcn Pierce's and
wuld follcnp the natural contour of tbe 1and.
Feten Patten stlcned what had been suhitied for tbe prcposal-.
Ilavld peel elplained the neigtiborrs proposal
&n Oorcoran aslsed wtry the Serafins cbject.
lbe Serafins said they donrt object, they juSt don't want this to iryact theirplans. lbey aid the DFB told thsn they cottldtrt go into the setback. Mrs.
Serafin said she thought this could be done without gofug irtto the setback on
Nottrs land a1so. Stre doesntt want to look at a waLl so close to tbeir pnoperty
line.
Davld Feel said by passing tbis, it rculd be very precedent settiag for this
a$ea.
Gerry llhite said he, too, feels it ls very precedent setting. Ile feels it is
a gmd plan ia that it would res'Eone the land to the way it is ncrr. He suggested
tbe nariance be tabLe for tuo veeld.s so that it could be studied firLher.
Deter Patten said both plans could be discussiqr itecrs ql Januarj 31 with approvalo Febnary ? and then ccrre back to PEtr on Febnra.:ry 1l' 1980.
Rqer tilkameier nade a rption to table the llront and Side Setbach Variance
Heqtrest to construct an Underground Crarage for Eve B.'Nott on Lot 10, Block 2'
Vail Village 13th. Ed Drager secstded. Ttre vote wa.s unaninpus.
to constnrct an
lFr
PUBLIC NOTICE
N0TICE IS HEREBY GIVEN THAT Eve B. Nott has applied for
a setback variance to a'l low encroachment of an underground garage into
the side setback. The residence is'l ocated on Lot 10, Block 2, vail
Village l3th. This application is made in accordance with Section lB.'12.060
of the Town of Vai] Ivlunicipal Code.
A Public Hearing will be held before the Tovnr of vail planning
and Environmental commission on January zg, l9B0 at 3;00 p.M. in the Vai'l
Municipal Building. said hearing wi1'l be he]d in accordance with section
18.66.060 of the Town of Vail Municipal Code.
TOhII{ OF VAIL
DEPARTMENT OF CO],[{UNITY DEVELOPMENT
N ^. ^^A A^o; ^YW^tLt t r' t-v v' \
JJnes A. Rubin
Zoning Administrator
Publ ished in the Vail Trail January 11, 1980.
Gordon R.
Architecture /
Pierce and Associates
Planning
MEMO T0: Jim Rubin
FR0M: Gordon R. Pierce
DATE: January 8, 1980
RE: Nott Residence
Attached herewfth is a drawing of the proposed underground garagefor the Robert Nott Residence in Booth Creek area.
l'|e felt that bui'lding the garage into the hill created the least
disturbance to the site. l{e a'lso located the garage 3'east of
the west property line in order to save as many trees as possible.
This type of structure has been built before in Vail and can be
seen at 1638 Spring Hill Road.
165O East Vail Valley Drive/Vail, Golorado 81657/(303)476-2657
TOWN OF VAIL
FOR VARIANCEAPPLICATION
/-'7-
/- v-7
, 1(/ -', /j,'- J A- l''t L. rJ . t
Name of Owner if different from Applicant
Application Date
Publication Date
Public Hearing Date
Name of Applicant
IIailing Address
Telephone
Legal Description: Lot Block 3 , Fili.ns /azZ UU//a:" -3r--Y-t
Application
Section l6
is hereby made
r'\ t ?'\, | /- . (_.i (? L-r
t mtes and
a Variance
of the
bounds description
from the provisions
Municipal Code for
If property s unplatted subm
for
as exh
of
the
ibit )
Town of Vail in order to a11ow:
I.;/in a .l('- Zone District.
APPLICATION WILL NOT BE ACCEPTE+'UNLESS ACCOMPANIED BY THE FOLLOIVING
,'e1. Hearing Fee - $100.00 + $1.40-for EACH addressed envelope.
2. A LIST OF THB OI{NERS OF THE PROPERTIES withi-n 300 feet in a
Single-Family Residential; Two- Family Residential; or
tho-Family Pri.mary/Secondary Residential Zone District; or
adjacent to the subject property in all other Zone Districts.
The owners list sha11 i-nclude the names of a1 1 owners and the
lega1 description of the property owned by each. Accompanying
this list sha11 be pre-addressed envelopes a1.ong with
Certificates and Return Becei.pts properly fi1led out to each
owner. These forms can be obtai-ned from the U.S. Post Offlce.
3. Site P1an, floor plan and other documents as required by the
Zoning Administrator. (This is to be submitted at the time of
publica Lion )
4. A description of the precise nature of the Variance.(This should include an explanation of the specific
hardship. )
DL! r lLcrt)€-"- O -{o ?aesa''t oe- tn"t ',- dll'ot uecl'-{a{"-x-
) & 'r-o*r e-"'---'-\ clo-z<1o-)/ <J<t'S
),l-/-'"' --./
Signature of Applican
r1*
a
Hc.//r'^/f\^,LA
t'w
iWfaXt
fr.-4-illL -,I \- t rs<-ffi--
Cl
// "
/), "
/3,
&,
30
3,t
1z
j3
,,r\
$n2
X,ttr
Xar*
'a
Xr-t,a
/rr/-rrrd. E C*o
la!-ta &//- n'L trul-zn
, U FaEab
/1Xa,y+ /rT/r///.,,)
#oc tbo (
Ua,z , b f/a-;7
U-l""4Eh/2-
o U
E
o-t &a/Z /Z/r"r^8 "/e(,l/d/-l , U t/bs7
/1lta*t traf""-
4 go>- J*r/H.%*r*,tk'
u^;t B7 [
^Q*-^rrt
L/ LA Yoa37
f?e e 8-*Z 'J/il/+ P^ ,
J^"r-tr, M-\,b & tUtol
6,*Irt- /fA;l^,,,^-Arh T6err-,/,.*,r4j-
8 J4^F-, t0
i,,^a, K^-*rr+Aerr/)+rfr4rv tbsl
*,vt A?t so,A /
*o*sA
AC6t 3&
Az"fuz*tr:
/o*, bftAsT
f"*"- %"r,uf\^t
g€:/.,0,to-St
U"U, Qa (tr,st ( r>un>
o
CONSTRUCTION PERMIT
rtment of Gommunaty dwelopment
TYPE OF PERMIT
fl
Du
m
m
E
BUILDING
ELECTRICAL
MECHAN ICAL
PLUMBING
FOUNDATION ONLY
LEGAL
DESC.
LOT ro BLK___z__
FILING \ t lqth
INAME: Nott Resid
OVftER NAME Eab Nqtt
MAIL ADDRESS
crrY Vail PH.
ARCHITECT rrnu Snovrdon & Ilopkins
uet eooness Box 1998
ctrY vail- cn PH.22o1
GENERAL
CONTRACTOR
14
rrnra Floyd Custam Builders
MATLADoRESS Box 1084
:hr* Vqi-l t^n PH n,574
"u'#i3l
FIRM
MAIL ADDRESS
PLUMBING
CONTRACTOR
FIRM
MAIL ADDRESS
CITY PH
MECHANICAL
CONTRACTOR
FIRM
MAIL ADDRESS
OTHER
CONTRACTOR
FIRM
MAIL ADDRESS
crrY PH.
)ATE 6/a2/79 PROJECT NO.N--294
l,l9 29
l.rYpEoFcoNSTRUCflON | ililr ru$k/
2. occuPANcY GRouP nee n fu)u
DIVISION ' "$GENERAL DESCRIPTION OF WORK
T\lanw Dmi rlanaa
PERMIT NO. "- ---
z
tr
=a
BUILDING 95,810
ELECTRICAL 4.1&
PLUMBING 3,600
MECHANICAL 1.0m
TYPE GROUP SQ, FT. VALUATION PERMIT FEES
R-3 2W sL.6n BUILDING PERM IT 334.40
a M 2U 1,170 PLAN CHECK 167.20
ELECTRICAL M.60
PLUMBING 30.m
NEW( N ALTERATION ADDITIONAL REPAIRI MECHANICAL 7.il\
DWELLING UNITS ] ACCOMMODATION UNITS-
c.R.F.A. 2116 eeonooirs 3
COMMERCIAL SYST
-RESTAURANT
SEITING
-HEIGHT IN FT.
-BATHTUB/SHOWER
2
NO FTREPLACES 1 rO.lOrLerS 2
COVERED PARKING
-
UNCOVERED PARKING
-
RECREATION FEE 3L7.40
DESIGN REVIEW BOARD 50.00
CLEAN.UP DEPOSIT 1m.oo
TOTAL PERMIT FEES 1-O53_1()
U NG OFF|C|AL DATEe p,"@=
-i11r13r-ADM INISTRATOR DATE
INSULATION
FLOOR
EXT. WALLS
ROOF
TYPE THICKNESS R"VALUE
)NING NOTES:Itin
Min
Min
HEAT
READ THIS APPLICATION AIiD STATTJ THAT THE
ABOVE IS CORRECT AND AGREE TO CO}IPI,Y
WITH ALL TOWN ORT'INANCES AND STATE
ELEC; I GAS:
SOLAR: IWOOD:
VAIL WATER & SAN. DIST. TAP FEE :
SPECIAL N OTES:
CONSTRUCTION PERMIT
rtment of community development
TYPE OF PERMIT rIT
trtrtr
BUILDING
ELECTRICAL
MECHANICAL
PLUMBING
FOUNDATION ONLY
LEGAL
DESC.
LOT BLK
FILING
f NAME:
dtften NAME
MAIL ADDRESS
CITY PH,
ARCHITECT FIRM
MAII ADDRFSS
CITY PH.
GENERAL
CONTRACTOR
FIR IV
MAIL ADDRESS
TRICAL
ACTOR
FIRM
MAIL ADDRESS
PLUMBING
CONTRACTOR
FIRM
MA]I ADDRESS
MECHANICAL
CONTRACTOR
FIRM
MAIL ADDRESS
OTHER
CONTRACTOR
FIRIV
I\4AIL ADDRESS
CITY PH
DATE PROJECT NO.
PERMIT NO.
1. TYPE OF CONSTRUCTION III III IV V
2. OCCUPANCY GROUP AB EH IR M
DIVISION
GENERAL DESCRIPTION OF WORK ;
122a34
EUILDING
i/IECHAN ICAL
PERMIT FEESTYPE GROUP SO FT. VALUATION
BUILOING PERMIT
PLUM BING
NEW() ALTERATION () ADDITIONALO REPAIRI
RECREATION FEEDWELLINGUNITS
-ACCOMMODATIONUNITS
G.R.F.A.
-BEDROOMS
COMMERCIAL SYST
-
RESTAURANT SEATING
HEIGHT IN FT.
-
BATHTUB,/SHOWER
NO FIREPLACES
-NO.
TOILETS
COVERED PARKING
-
UNCOVERED PARKING
DESIGN REVIEW BOARD
CLEAN-UP DEPOSIT
TOTAL PERMIT FEES
ILDING OFFICIAL
NING ADMINISTRATOR
ONING NOTES:
INSULATION
R.VALUE
FLOOR
EXT. WALLS
ROOF
THICKNESS
I HEREBY ACKNOWLED(iE TIIAT I HAVE
READTHIS APPLICATION AND STATE TIIAT THE
AIt0VE IS CORRECT AND AGREE T{) CO]IIPLY
WITH ALL T()WN ORDINANCES AND STATT:
LAWS REGARDING BT'I I,DING C{)N S'I'R IiCTI0N.
VAIL WATER & SAN. DIST.TAP FEE :
SPECIAL NOTES:
T
Dn
nln
TYPE OF PERMIT
BUILDING
ELECTRICAL
IIECHANICAL
PLUM BING
FOUNDATION ONLY
EGAL LOT / () BLK___?-__
FILING '\/'J ii"-
*U
RCHITECT
3ENERAL
NTRACTOR
L ECTR ICAL
NUTOR
I rlrtQrntn
,NTRACTOR
ECHAN ICAL
'NTRACTOR
OTHER
i*r*^cro,
uevi-*-a */r,Zf
MAII AODRESS
crrY r/n ..- PH.
,,ou 11,,,.,r.,' .-\N. ;-.g
r,,r,!L Arf Rssi 1l-,-r - -?ltr
ctTY i; "' '
i.-"
FIRII
IIAIL ADDR ESS
FIR ll
I,I AIL ADDRESS
CITY PH.
,.-
rr arl annDFqq
EITY PH
F tR r,{
I.I AII- ADDRESS
F tR f,,i
I,IAIL AODRESS
CITY PH
I
\
DATE PROJECT NO.
N9
r.rvpEorcor,tsTRucTtoN t tr trr rv@
?,eccuPANcYGRouP aa r n @r
DlvtstoN t 2 2&
GJ;AE
S-.ll
RAL DESCRIPTION OF WO
xtl^e 1- A t,t t t-
PERMIT NO. '' -
z
tr
EUILDING ?,+- t
ELECTRICAL o
Pt U I"I8IN G sboo
MECHANICAL oo
TYPE GROUP SO, FI, VALUATION PERMIT FEES
123 23(oL q./ 6./,,BUILDING PER M IT 33q. qO
5 z3L/t r?D PLAN CH ECK / lar'ZO
ETECTRICAT qL, bb
PLUM BING 3b. ab
MECHANICAL ?rc-oNEwo(1 ALTERATION il ADDITIoNAL il REPA]Ril I
I
DWELLING UNITS I ACCOMi\4ODATION UNITS-]
=)G.R.F.A.
-BEoRooMS
.>
i
COMMERCIAL SYST
-_RESTAURANT
SEATING
--i
I
I
HEIGHT IN FT.
-BATHTUB/SHOWER
U
',.tiNOFIREPLACES ' ,NO,TOILETS ?I
covERED pARKTNG I ur.rcovrREo pARKTNG
-_
l
I
R EC R EATIO N FEE 3 t1 ,41
O€SIGN REVIEW BOARD .fO, OO
CLEAN,UP DEPOSIT /OO, OO
TOTAL PERMIT FEES tr4'
ITNJJ.
jjid'iruFoF-rr6-nL-- - - 6riE
INSULATION
ON
r LUUX
EXT. WALLS
ROOF
TYPE THICKNESS R.VALUE
1l\(, AUMII\l)ll(Al\Jll IJAIE
,ft)ttt ONING NOTES:
l/).tP'
rby i
HEAT
ELEC: I GAS:
I HEREBY ACKNOWLEDGE TITAT t HAVE
READ TH IS A PPLICATIOX AND STATS TIIAT THE
ABO\IE IS CORRECT A.ND AGREE TO CO}IPLY
WITII ALL T(}WN OITDINANCES AND STATE
LAwS RECARDINC EUILDING CO.\"STR UCTI (tN.
SCLAR: I WOOD:
VAIL VVATER & SAN. DIST.TAP FEE :
qPFa lAl NOTFSI
{klt \Tl,rtl lrt tl\r\f r{ r'rt ( ir\
Permit No. 0001+20
l,AIt WATER AI{D SAl{ITATION DISTRICT
WATER Al{D SEWER TAP PERMIT
TAP PERMIT WILL NOT BE ISSUED UNTIL TAP FEES HAVE BEEN PAID IN FULL.rr nNAMEOF JOB $Jo-r-r lCE3.I'C€y\)C;,
LOCATION AND LEGAL DESCRIPTION
GENERAL CONTRACTOR
PLUMBING OR MECHANICAL CONTRACTOR
EXCAVATING CONTRACTOR
SIZE OF TAP: Water
Lrc. No. t 4t - ft
Ltc. No.
Llc. No.
NUMBER oFuNtTs_/ 9J2L_ x
Date Billed
Blde. D€pt. - White; -
o
TOWN OF VAIL
STREET CUT PERMIT
o
PERMrrNo.il j. 109
Work is for: (circr€one)
Addre6s and Liconse No.)
GAS
o PermitFee 5 90
INSPECTION REMARKS
Bill tc
Puid, 8/F..l.19 F;;-;;, Receipt#: l4,af-
SKETCH PLAN OF WORK ATTACHFD
,4tazEt,
Ttac--
Za >. 3&
/€-g r< ?4
t/zv 1r +l
,//2 r(32)e-.
2c: x 38
/,5.s t< ? o
'*rrv * q
/6x/A s /8O
,/S.S '- 3.5- = S1
zuk z t/a,, V..no rc#
?eza rflr
31.Q
et@e
€o-
a le eZ./
33 1/,a o
---= 7bO -tft,r^4 3iq.qo
--= 3t o ' ,4*n Ge A /6v,U)
__ tr3
?sGO @ y'a = ?/ oqo
a
??,1, &
/ / o.?o
//3
23y' €€=
3Z--Z.co 69.? 4,Go
lZ. aa
44oCa
7e=
,/ @ 434:
/&a
z36a Q4rs = 4144
Z4-
t @,tg
fu2P
oo
PROJBCT
otllNBR ls
PIIONE #
NAME
$ff!
box 100
vail, colorirdo 81 657
(3031 476-s613
The follorving
are required to complete
Department Ior rcview:
department of cornmunity development
additional information or corrections
the Plan Check which is now in the Building
lsuli n
f have read and understa.nd the atrove,pla,,.-."o'."gi
,
"igned;-
RISID€ffTIAL I.IATER E SA'€R TAP FEE CATJI!-ATICTI
Ittl€ OF t|3€ O'r?l€R
STREET ADORESSLAT /o ' ztxc(
'^'":rffis':il;rsrRln o.
aecx X'Pt{Ysrcrl-
-
Pl-All
BILLI}E AI}DlEsS
4nsrH & TTIILET. x
(SIE }TALF EATTU
/ glapeyllrr;s/&tutulx
KITC€NS
Dlst?sslERs
UTNDRIES
Grn xsrri)
tcE t4Aci{INES
SATNAS
wnrn coo*ns &
T{ATER FOTI'TIAI}S
sl{ll'r4$lc Po]6
JAO'ELI
OUTSIDE HATB
0,uHl.ttt or cse)
Flrt 8AllS
R00{s
KITC1EN
DIS}HAST€R
isonrrs
Zx
L5t
,E
,.m2,
3i
q.
5.
6.
7,
8.
. FIT.I BATH .
(srg"tR oR TtB,
BASIN, TOTLET)
R61s (LTVING RM$ls,
sIilDlos,
:/x 2.fi
/ x I.fr!
/x.g)
4' ,6
lx .E
= -'1 ,D
/"
/
- '/'
z.e
,t'O
' ,5
.2<
9.
10,
l.
2.
,,
4.
5.
..//'6 /t /rq
' INTE
X,E' x 5.fi1
"l ls -i,#-=rc
x 3.m
x l.m
rtffi:
x' .5)'-
xLf,l=
.r'*
F(XIO{IIIG T}E CO|.?LETICI.| OF G}ISTRL'CTIOII OF ALL STR(f,IltrlES' T}IE DISIRICT SMLL
ffiF"srl'; iipsic-[-ii;t'ectlcl oF
^LL
FRalltsss io DErEF,nlr'rE nE !I'ILTER-oF- Poll:rs
tb"ffi'ASS€i;S'lrCO'Ur::,: IO IP= tintEil ffiD sei.ijR Tt2 FEE, ,"iiD l. TE Sclr-trijtf, '\s
iiri,ieii-rvju-nrE-6isrrrrcr SH^LL l',1r€ itlY-tor-usrliitrs li;cEss'\?Y ln-il€-gRlGIil L
ini'ii;'piio."'ixii-r;rsaecTlcn-sirar-r- ALeJ DfltiuitiE nG tult-Dll:G clrrr€R's rt\TER
Ii{D SII{ER 5ERVICE CJU\'$E.
l. BAss€Nrlsr ruoon
2m rrcor
JRD FI,-OCR
MStl€t{T
Isr nmr
?m rumn
)fiD FL@R
BASB€IITlsr roan
bo aooa
JRD FLOOR
-/
.--
NPARn€NIS
INFEGrOR
DOARD 0F Dtncfitr[i'
\*!/t -Dat e_
-v
t1 M kq 1"117
NAME oF pRortrcr l\lOff e4lWlJCE.*_..-_--
LEGAL DESCRIPTION ID LOT
DESCRIPTION OT PROJECT
LIST OF MATERIALS
FILING
The following information
to the Desi.gn Review Board
A. ) BUILDING MATERIALS:
Roof
' Siding
Other IYa1l Materials
Fascia
Soffits
Windows
lVindow Trim
Doors
Door Trim
Hand or Deek
Flues
Flashings
Chimneys
Trash Enelosures
Greenhouses
Other
is required for submittal by the Applicant
before a final approval can be glven.
Type of Material Color
^oD
WF
including Trees, Shrubs,
Size
€|'DIN
qDb
ibednt)
WUJIJ
MNCIT
B.) PLANT MATERIALS(Vegetative, Landscaping Materials
and Ground Cover)
Botanical Name Coumon Name
('/1lhzArvewvrt
Mwt'E e6bAraD
2qc.
Quantity
Ia, ht.
Mt#,
'"r^*w
iln"U:P.
\,_:/oll.-a I
Page 2
Plant Marerlals Continued
Botanical Name Comron Name Quanritv Size
OTHER LANDSCAPE FEATURES(Retaining Walls, Fences, Swiuuring Pools, etc. )
(Please Specify)
c.)
I
Q rrt)
7Il| | r.' rltIrat,,-\/t t I- L,l I l.\,l\
for
P/S Z(Ji{[ DISTIiICTS, R, R
Lot Area 36 Z>a.. Heighr A'ilorved 30' proprrsed _ @k
Setbacks : Front,-Rcquiic.A 2O; --Proposecl
Sides-Required l5' Proposed
Rear -RequireC l5' Proltcsed
hraterccurse-requir"ed O Proposed
GttFA: Al'lov;ed i ffg U
GRFA:Prilnatl' A] I ot,led
Seccrndary Al I ovted
Enviroumenta'l/llazards: Avajanche
o
Proposed 2 t t L
Priner;, Proposcd --&'t
Secondary Propose<l ///ft ____
Proposed
Proposcd
Propcsed
Actual-
F'lood l)lain ___ ____QtC_
:
Site Coverage: Allorved
---2@%-Landscap'ing: Rcquir "d
--&O/e.-Parl,.ing:. 'Rcquired
- Z
Drive: Slope Permittcd
Corrnents:
Zoni rrg i Datc:
,-5L5// (
lJ/
:L'L.S
)z-'8 ?Z
oiq
Lt 'ha -\
LE,'h3 ?
Jz9 x l/
)'E/ ryfi/
:iLxJat 7
a )L8t u?t
--
Z&a7
8A+
bt x -c,h/
__s -€ ) tt
-sc'/{ x }t@7
--q4'bzt 1
9o/
-.< 3 L(
-.c'8e
-<l Lv
Itvu>P
Project Application
oate b 11 l-q I
,A n--?- | ,'1
Project Name: VL'$ t'u it-'l Q-uLo a,'r-c!
Proiect Description: YL!-uJ rr'r.0 lrllt t L Q*
Owner Address and Phone:
Architect Address and Phone:
,i r.v ,:::t-, , \/cr* Q 4lc,-'z'eol
LesarDescription,to, IA ,Btock ?t ,Firins UU [€l]u-
Zone:
Zoning Approved:
Design Review Board
:;, lrc l-t3
DISAPPROVALAPPROVAL
Summary:
Administrator Chief Building Off icial
Project Application
ttt/. l'), I JC>Il)Ale<t|=tI|,Ja
TProiect Name: hr,tt F":l.-ora"*.q-
Prolect Description:
Owner Address and Phone:
Architect Address and Phone:
41(o- L.Lal
Lesal Description: t-ot l'O , erli 2- , Fitins \,/ U [ 3+{^-
Zone:
Zoning Approved:
FOVAL *
Design Review Board
oat 's l3J )z
DISAPPROVAL
ing Administrator
Date:
Chie{ Building Off icial
UYlffr =) rc\-\ <1
\.l.,- \r-_o= f uxo.c.
Iie.. \-o- \.' . \r,o "r. z $ \rq- \ \ urq,;6 \-) +\* F rr, ir: ,:.
\ \a , . *- .-"-,.-$3-.r \\^ < G-V.,., o \i\dr \
Q-=-\N*s- \- -:u'r r c--. D i€ \\": .\--- q,- .5\ ,:.,. .'v . q_
arr r-...r e.. \
'\ e. \11os c{ (,(<?o \ .- -\.., \- Cr) rr - .,li- . \ (
cLcr.r**,-Lo. Per<. es*Lc;1e <r .\ *\c.qr.a .o \.(? x-.-c1,.-rrg<-$
a- t .. -t ) Sr- < u o i* \.--, \os\ .\= -\o7o s' .) qre
\t.,,.. cr-,\t Vo q..L...-.-! .,_--.\\ ,...,- _1\,.- *=o\
\c So,.,, s.l
\\ r-.-
UNs (orz<aqa s*\
-
-
i cr,.r.-..-<L.-,
Project Application
3- s'r- 7g
/,-,, , t-rr tn, / ,
Project Name: t / V:L( L it-T gl&,t'r </-
Proiect Description:
Ownor Address and Phone:
Architect Address and Phone:
Legal Descriptio nt tot / O , Btocr cl , riling
Zonlng Approved:
Design Review Board
Motion by: ''-
Seconded by:
APPROVAL DISAPPROVAL
Date:
Zoning Administrator Chief Building Olficial
Date:
timothy michoel boyle / structurol enginew
949-5420 / post office drq^/a f-100
20 eogle rood lwon, colorodo 81620"
October 10, 1979
Town of ValI Building Dept.
P. 0. Box 100
V&il, Colorado 8L557
Subjeet: Framing for the Nott Residence
Lot 10 Block Z
VaiI Vitlage 13 Filine
Dear Sirsr
0n October 9, t979, f nade a franing inspection of the
above noted residence, I observed the followingr
1) A numberi,of the 8 x 12 roof bearns have as few as two
stude under them for a column instead of studs the full width
of the bearn.
2) In three cases, the beam reactions track down over a
headsr.
f have analyzed these situations and anived at the follow-
ing conclusionsc
1) lwo studs will be adequate oonpression mernbers under
the beame.
2) In the cases where the beams bear over a header, the
header will have to be reinforced to handle the shear. Ihe
contractor has agreed to renove the innermost 2 x 10 ard add
e L/4 " steel flltch plate1 replacing the 2 x 10 on the inside
face, and bolting the systern together with two rows of l/2"
dianeter at 24" on center. These lags are to be 5" long.
Should you have any further questions, feel free to call .
#,Ltt:l$Lo...'+o
-'$..:J
r*]'14965't-t"
(fu,,^,o*]$l
ffiiii'?ir'"ss
*q, )
PERMIT NUMBER OF PROJECT
DATE
READYFoR|NSPECT|oN:MoNTUESWEDTHURFR|-AMPM
LocAroN: C"f ro K/{.2 VU,t( ,s+1 za{f&.ry'*/h1
DISAPPROVED
INSPECTION REQUEST
^/"
rf
CALTER
TUES
TOWN OF VAIL
JOB NAME
BUILDING:
D FOOTINGS / STEEL
PLUMBING:
D FOUNDATION / STEE-
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATERtr FRAMING
,-.1 ROOF & SHEER" PTYWOOD NAILING D GAS PIPING
tr INSULATION D POOL i H, TUB
tr SHEETROCK NAIL
ELECTRIGAL:
tr TEMP. POWER tr HEATING
E EXHAUST HOODS
CONDUIT D SUPPLY AIR
tr FINAL tr FINAL
Cl APPROVED
CORRECTIONS:
tr REINSPECTION REQUIRED
INSPECTOR
-;r
/I
?tf rNs CTIONTOWN OF
{"-*rrt
REQUE$T
VAIL Ioo* Eft q/4 t JoB NAME
t / +'h f rowN oF vAlL I
CALLER
READY FOR
LOCATION:
INSPECTION:
o7- t
MON
,(L{ z
TUES WED THUR FRI
U, r f
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
B ROUGH / D-W,V.
tr ROUGH / WATER
tr FOUNDATION / STEE-
tr FRAMING
- ROOF & SHEER
" PLYwooD NAILTNG tr GAS PIPING
tr INSULATION POOL I H. TUB
tr SHEETROCK NAIL
ELE
trT
trF
trC
tr_
tr HEATINGTEMP. POWER
tr EXHAUST HOODS
CONDUIT
tr APPROVED
CORRECTIONS:
DISAPPROVED tr REINSPECTION REQUIRED
INSPECTOR
t
JOB NAME
INSPECTION: MON TUES WED THUR FRI
-_
AM PMLot tc ,,::b/^ iJU,,( ,5./, z6{s'-r(r.(;2;;7",
CALLER
f<t n
7q{
PERMIT NUMBER OF PROJECT
DATE
READY FOR
LOCATION:
tNs
BUILDING:
)i
T] FOOTINGS / STEEL
tr ROUGH / D.W.V.
tr ROUGH / WATER
,-'' BOOF & SHEER" PLYWOoD NAILING tr GAS PIPING
tr INSULATION POOL / H. TUB
ELECTRICAL:
tr TEMP. POWER tr HEATING
tr EXHAUST HOODS
tr SUPPLY AIR
tr APPROVED
CORRECTIONS:
DISAPPROVED tr REINSPECTION REOUIRED
INSPECTOR
pffi$oP
u/INSPECTION REQUEST
PERMIT NUMBER OF PROJECT
DATE
READY FOR INSPECTION:MON TUES
Loc^r,oN'.M-/4
DISAPPROVED
WED THUR FRI/t&Joy',i
PM
fnerruseecroN REeuTRED
TOWN OF VAIL
BUILDING:
O FOOTINGS / STEEL
PLUMB!NG:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
E FRAMING
_ ROOF & SHEER
" PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL / H, TUB
tr SHEETROCK NAIL
tr FINAL
ELECTRICAL:
tr TEMP. POWER tr HEATING
O EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr FINAL tr FINAL
O APPROVED
CORRECTIONS:
DATE INSPECTOR
r//INS
r&+<^u
t
PECTION
TOWN OF
REQUESTVAIL i
i
PERMIT NUMBER OF PFOJECT
DATE
READY FOR INSPECTION:
LOCATION:
TUES WED THUR
I NAME
MON
CAILER
FRIJ&l,i
' l'r.
'a.
#, ilil6 rce
tr APPROVED
CORRECTIONS: -
PLUMBING:
tr FOOTINGS / STEEL E UNDERGROUND
tr ROUGH / D.W.V.
tr FFAMING
-
tr ROUGH/WATER
E 19.9..1^LSi.qFn tr GAS PIPINGPLYWOOD NAILING
O INSULATION tr POOL/ H. TUB
tr SHEETROCK NAIL
tr HEATING
tr EXHAUST HOODS
-tr SUPPLY AIR
DISAPPROVED REINSPECTION REQUIRED
DATE INSPECTOR
t rNstcnoN REeuEsr
TOWN OF VAIL
oete ,/n,/ t'L / 1 I JoB NAME
BEADY FOR
LOCATION:
INSPEGTION:MON -u*<$Q
EUILDING:
o-rdorrrucs / srEEL
PLUMBING:
tr UNDERGR OUN
).w.\
VATI
t\t _
TUB
tr
tr
tr
B
tr
B
FOUNDATION / STEEL tr ROUGH /
tr ROUGH /
tr GAS PIPI
to
n
W,
N(
,ND
TER
rB_
:
)oD
FRAMING
INSULATION
SHEETROCK NAIL tr
g
tr
POOL / H.
FINAL FINAL
ELECTRICAL:MECHANICAL:
tr
o
tr
tr
TEMP. POWER tr
EI
tr
tr
HEATING
ROUGH EXHAUST HOODS
CONDUIT SUPPLY AIR
tr FINAL tr FINAL
y' aeenoveo
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE INSPECTOR
INSilCTION REQUEST
TOWN OF VAIL
,or, 6,- ( q -'lcl JoB NAME - Q1t7', i'L/rork,,^ n
READY FOR
LOCATION:
INSPECTION:MON
CALLER
PLUMBfNG: "-'i(''t t- &-/h'1
OOTINGS / STEEL tr UNDERGROUND
FOUNDATION / STEEL tr ROUGH / D.W.V.
E ROUGH / WATERFFAMING
INSULATION tr GAS PIPING
SHEETROCK NAIL tr POOL / H. TUB
ELECTRICAL:
tr TEMP. POWER tr HEATING
ROUGH EXHAUST HOODS
CONDUIT SUPPLY AIR
tr FINAL
'
,{ r{'.,'')1
APPROVED
CORRECTIONS:
tr DISAPPROVED O REINSPECTION REQUIRED
DATE ILt J' P ""- '''^' ' lNSPEcroR
DATE
READY FOR
LOCATION:
JOB NAME
MON
- - .., -:i.--
CALLER
TUES
INSilCTION REQUEST
tr REINSPECTION REQUIREDtr DISAPPROVED
TOWN OF VAIL
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
ERflqfERGROUND
tr ROUGH / D.W.V.
D ROUGH / WATER
tr FOUNDATION / STEE-
FRAMING
INSULATION
SHEETROCK
tr GAS PIPING
O POOL / H. TUB
tr FINAL
ELEGTRICAL:
tr TEMP. POWER
MEGHANICAL:
O HEATING
ROUGH tr EXHAUST HOODS
CONDUIT O SUPPLY AIR
tr FINAL
CORRECTIONS:
INSPECTOR
rrustcnoN REeuEsr
TOWN OF VAIL[r /l
JoB NAME {\)t'-t--i" 1= 'r r; .-, rl-a-rn r IDATE
READY FOR
LOCATION:
CALLER
INSPECTION:THUR
---
-@er'r
EUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr
tr
tr
tr
tr
n
UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATERtr FRAMING
tr INSULATION
tr SHEETROCK
n
GAS PIPING
NAIL POOL / H. TUB
tr FINAL tr FINAL
ELECTRIGAL:
drr. PowER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
n
tr SUPPLY AIH
n
tr FINAL tr FINAL
APPROVED
CORRECTIONS:
tr DISAPPROVED D REINSPECTION REQUIRED
DATE INSPECTOR
rrrrsilcnoN REouEST
DATE JOB NAME
READY FOR
LOCATION:
WED 6G
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEE-
tr UNDERGROUND
-
D ROUGH / D.W.V.
tr FRAMING O ROUGH / WATER
tr INSULATION
tr SHEETROCK
tr GAS PIPING
NAIL tr POOL / H. TUB
tr
tr FINAL tr FINAL
ELECTRICAL:
EI TEMP. POWER
MECHANICAL:
tr HEATING
ROUGH tr EXHAUST HOODS
EI
tr
tr
CONDUIT tr SUPPLY AIR
tr
FINAL tr FINAL
ft eeenoveo
CORRECTIONS:
N DISAPPROVED tr REINSPECTION REQUIRED
DATE INSPECTOR
DATE
-4.r i j' i
rr.rsilcnoN REeuEsr
TOWN OF VAIL
.' A i,READY FOR INSPECTION:
LOCATION:
JOB NAME
MON
.,)
CALLER
TUES THUR PM
BUILDING:
D FOOTINGS / STEEL
tr FOUNDATION / STEEL
PLUMBING:
N UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr GAS PIPING
N POOL / H. TUB
tr_
O FINAL
MECHANICAL:
O HEATING
tr EXHAUST HOODS
tr SUPPLY AIR
-
r] _
tr FINAL
R..FRAMTNG
tr INSULATION
tr SHEETROCK NAIL
tr
tr FINAL
ELECTRICAL:
tr TEMP. POWER
tr ROUGH
tr CONDUIT
n
tr FINAL
tr -AFPROVED GI*EISAPPROVED fl-fi EINSPECTION REQUIRED
DATE INSPECTOR
o ,., ]NSTCTION REQUEST
TOWN OF VAIL
CALLER
TUE WED THUR
,^,, laf//z? JoB NAME
READY FOR
LOCATION:
INSPECTION:a
BUILDING:PLUMBING:
tr FOOTINGS / STEEL
tr FOUNDATTON { SrEEL _xRouGH/D.W.v.
tr FRAMING tr ROUGH / WATER
tr INSULATION tr GAS PIPING
tr SHEETROCK NAIL tr POOL / H. TUB
tr
tr FINAL E FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANIGAL:
tr HEATING
tr ROUGH
-
tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr
tr FINAL tr FINAL
PROVED tr DISAPPROVED tr REINSPECTION REQUIFED
CORRECTIONS:
+'..'*'G
INSPECTOR
lr*silcrfoN REeuEsr
TOWN OF VAIL
DATE
READY EOR
LOCATION:
INSPECTION:
JOB NAME
MON
CALLER
TUES WED THUR FRI AM@
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
TI ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
E #MING
tr
tr
tr
INSULATION D
tr
tr
GAS PIPING
SHEETROCK NAIL POOL / H. TUB
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr FINAL tr FINAL
PROVED
CORRECTIONS:
tr DISAPPROVED P REINSPECTION REQUIRED
INSPECTOR
INSTCTION REQUEST
DATE JOB NAME
CALLER
TUESREADY FOR
LOCATION:
Mo/
),i i
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
O ROUGH / D.W.V.
E ROUGH /WATER
tr FOUNDATION / STEEL
tr FRAMING
tr INSULATION tr
tr
tr
GAS PIPING
SHEETBOCK NAIL POOL / H. TUB
tr
tr FINAL tr FINAL
ELECTRICAL:
T] TEMP. POWER
MECHANlCAL:
tr HEATING
T] ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
B FINAL tr FINAL
tr APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
DATE INSPECTOR
INSCCTION REQUEST
TOWN OF VAIL
READY FOR INSPECTION: MON TUES WED , HU-R FRI nfrrf PM
LOCATION: , ".' ''; .,' '
BUILDING:
tr FOOTINGS / STEEL
tr FOUNDATION / STEEL
tr FFAMING
tr INSULATION
-
PLUMBING:
tr UNDERGROUND
T] ROUGH / D,W.V.
D ROUGH / WATER
tr GAS PIPING
SHEETROCK NAIL
-
tr POOL / H. TUB
tr
tr
D
FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
tr ROUGH
tr CONDUIT
MECHANICAL:
tr HEATING
tr EXHAUST HOODS
tr SUPPLY AIR
tr
tr FINAL
g
tr FINAL
tr APPROVED
CORRECTIONS:
tr DISAPPROVED O REINSPECTION REQUIRED
DATE INSPECTOR
4-W /:::!:"''
INSPECTION:
'''_'-qi*Etr
DATE
READY FOR
LOCATION:
WED \THUR. FRI
JOB NAME
MON
CALLER
,TUES
INSTCTION REOUEST
TOWN OF VAIL
----@ PM
BUILDING;PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER
tr
E
tr
tr
tr
tr
FOOTINGS / STEEL
FOUNDATION / STEEL
FRAMING $r
INSULATION tr GAS PIPING
SHEETROCK NAr!tr POOL/ H. TUB
tr
tr FINAL tr FINAL
ELE
trT
trF
trc
tr_
CTRIGAL:MECHANICAL:
TEMP. POWER tr HEATING
ROUEH tr EXHAUST HOODS
CONDUIT o SUPPLY AIR
rl
FINAL tr FINAL
"{
/,W"^o"'
CORRECTIONS:
F.DTSAPPROVED ARE|NsPEcfloN REQUTRED
DATE
INSECTION REQUEST
TOWN OF VAIL
DATE
READY FOR
LOCATION:
JOB NAME
. MON"
CALLER
TUES , T'nun; FRIWED
{
,J. ,/' ,
BU
trl
DI
trl
trl
trl
tr
ILDING:PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
E ROUGH / WATER
FOOTINGS / STEEL
FOUNDATION / STEEL
FRAMING
NSULATION tr GAS PIPING
SHEETROCK NAIL tr POOL / H. TUB
E. FINAL E FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANIGAL:
tr HEATING
tr
tr
tr
ROUGH tr EXHAUST HOODS
CONDUIT tr
tr
SUPPLY AIR
tr FINAL tr FINAL
C] APPROVED
CORRECTIONS:
g-p+SAPPHovED ' if FElr\sprcrroN REeu rRED
'.| ', ;)
INSPECTOR
DATE
READY FOR INSPECTION:
LOCATION:
INSECTION REQUEST
TOWN OF VAIL
''-.)'--.^\'(Juv.&] FRI
Z-lEJusPr
JOB NAME
CORRECTIONS:
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr FOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D,W.V.
tr ROUGH / WATERtr FBAMING
tr INSULATION tr GAS PIPING
B SHEETROCK NAIL O POOL / H. TUB
EI
( prrrrnr- tr FINAL'l
ELEGTRICAL:
tr TEMP. POWER
MECHANICAL:
O HEATING
O ROUGH EXHAUST HOODS
tr CONDUIT
II
SUPPLY AIR
tr FINAL tr FINAL
tr APPROVED PPROVED REINSPECTION REOUIRED
INSPECTOR
rNstcroN REeuEsr
DATE
READY FOR
LOCATION:
INSPECTION:
JOB NAME
MON
CALLER
fUES j''/'AM:PMTHURFRI
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
n nOUCtr / WATER
O FOUNDATION / STEEL
tr FRAMING
O INSULATION O GAS PIPING
E SHEETROCK NAIL tr POOL / H. TUB
o tr
trFINAL FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr
tr
n
ROUGH tr EXHAUST HOODS
CONDUIT N SUPPLY AIR
tr FINAL
o
o FINAL
d neenoveo
CORRECTIONS:
D DISAPPROVED D REINSPECTION REQUIRED
DATE INSPECTOR