HomeMy WebLinkAboutVAIL LIONSHEAD FILING 1 BLOCK 1 LOT 3 LIONS PRIDE BUILDING GENERAL LEGALO Vi*l t"+t l<+ rytv I
- 6,*tt"'clf i
Design Review Board # Llr,'s {n ag
ACTION FORM
Department of Cornmunity Development
75 Sorrth Frontage Road, Vail, Colorado 81657
teL 970.479.2L39 fax: 970.479.2452
web: www.ci.vail.co.us
Project Name Bootlab Sign DRB Number: DR8030452
Project DescripUon:
REPI-ACE DCSTING SIGN THAT SAYS BOOTWORY TO THE EOOT I.AB
Participants:
OWNER LAAER, ROBERT T. & DIANE J.10/08/2003 Phone:
PO BOX 1325
VAIL CO
81658
License:
APPUCANT KENNETH MNDBY 10/08/2003 Phone:
5OO EAST UONSEHAD CIRCLE
VAIL, CO 81657
License:
Prcject Address: 555 E UONSHEAD CR VAIL Location:
BOOT I.AB 5OO EAST UONSHEAD CR
Legal Description: Lot: 3 Block: Subdivision: UFT HOUSE - A CONDOMINI
Paroel Number: 210106313055
Comments:
BOARD/STAFF ACIION
Motion By: Action: STAFFAPR
Second By:Vote: DateofApproval: 10/08/2003
Conditions:
Cond: 8
(PLAN): No changes to these plans may be made without the written consent of Town of
Vail sbff and/or the appropriate review committee(s).
Planner: Bill Gibson DRB Fee Paid: $72.50
a
TOI4'Nffi
of
Application for Design Review
qJ
'w*,Department of Community Development
75 South Frontage Road, Vail, Colorado 81657
tel: 970.479.2139 fax: 97O.479.2452
web: www.ci.vail.co.us
General Information:
All projects requiring design review must receive approval prior to submitting a building permit application. Please
refer to the submittal requirements for the particular approval that is requested. An application for Design Review
cannot be accepted until all required information is received by the Community Development Department. The
project may also need to be reviewed by the Town Council and/or the Planning and Environmental Commission.
Design review approval lapses unless a building permit is issued and construcdon commences within
one year of the approval.
#
tey
Location ofthe Proposal: Lot:
Physical
Zoning:
Name(s) of Owner(s):
Mailing
Owner(s) Signature(s):
Name of Applicant:
Type of Review and Fee:
tg(sisns
E Conceptual Review
E New Constructiontr Addition
E Minor Alteration
(m ulti-family/commercial)
E Minor Alteration
(single-family/duplex)
tr Changes to Approved Plans
o 6t
970-328-8640 for parcel no.\1,0-
$50 Plus $1.00 per square foot oftotal sign area.
No Fee
$650 For construction ofa new building or demo/rebuild.
$300 For an addition where square footage is added to any residential or
commercial building (includes 250 additions & interior conversions).
$250 For minor changes to buildings and site improvements, such as,
reroofing, painting, window additions, landscaping, fences and
retaining walls, etc.
$20 For minor changes to buildings and site improvements, such as,
reroofing, painting, window additions, landscaping, fences and
retaining walls, etc.
$20 For revisions to plans already approved by Planning Staff or the
Design Review Board.
E-mail Address:
For Office Use Onlv:
r"ip"ii' -5@-- cnecxno.: /60 b ev: /Geppncaronoate: /o/4o3- ongn-o.:
(+
JOINT PROPERW OWNER
WRITTEN APPROVAL LETTER
I, (print namqL4ilq cohnd (tu#,ajointownerof propefi locatedat(address/tegal
IOI4Nffi
description) .LionsPata< lLst.lt, Stlt) t. t-to,..tz*eo-., u*ll' 0*rL (n..Sr4.l?
provide this letter as written approval of the plans dated which have
been submitted to the Town of Vail Community Development Department for the proposed improvemenG
to be completed at the address noted above. I understand that the proposed improvements include:
l.c)'a,et 4_, slEaa -
I fudher understand that minor modifications may be made to the plans over the course of the review
process to ensure compliance with the Town's applicable codes and regulations
t1
8 | zrlog
(Date)
Page 2 of 4/01110102
,*m SIGN APPUCATION
SUBMITTAL REQUIREMENTS
General Information
This application is for any sign that is located within the Town of Vail. Specific requirements are available
from the Deparfrnent of Community Development.
SUBMITTALREQUIREMENTS ilr
A' Name orBusiness: i W I^t )6* Tl^r A-+tb
B. Buildins name and physicataddressi /^;urS l,[" g0 E /rr,^rloJ C,
C. Written approval from condominium association, landlord, and joint owner, if applicable.
D. Type of sign (check all that apply):
trFreestanding Sign
r]Wall Sign
!Hanging / Projecting Sign
trDisplay Box
trDaily Special Board
trJoint Directory Sign
Sign and lettering dimensions for each
drawing @1/+" = L'):
Length of business frontage:
Height of sign(s) from grade:
Sign Location (attach a site plan and an elevation
indicating the proposed location of sign(s)):
Materials and colors of sign (attach samples):
Sign lighting plan:
a colored scaled schematic
tr Building Identification
tr Mural
tr Window Sign
tr Sign Program
B Gas Filled/Fiber Optic
O Temporary Sign
trsubdivision Entrance sisn
i
vther
'{*ni'-6- 1E. Number of signs proposed: 4 Number of signs existing: *
F. sign r"rrug", Th. 6r",1 '{.t.t
G.
H.
t.
'l
K,
L.
ng or a photograa.'4 45 erf clearly
o Indicate type, location and number of fixtures.
tr Include height above grade, lumens output, luminous area.
o Attach a cut sheet for each proposed fixture.
M. Drawings showing how and where the sign or awning will attach to the building and how
the awning will be constructed,
Page 3 of 4l0l/10/02
d/ru"rly o{h\,r.} L 0,rU;-+a0
N. The Administrator and/or DRB may require the submission of additional plans, drawings,
specifications, samples and other materials (including a model) if deemed necessa'ry to
determine whether a project will comply with Design Guidelines or if the intent of the
proposal is not clearly indicated.
NOTES TO ALL APPLICANTS
Time Reouirements
The Design Review Board meeE on the lst and 3rd Wednesdays of each month. A complete application
form and all accompanying material must be accepted by the Community Development Department prior
to application deadlines. A schedule of DRB meetings and associated application deadlines may be found
on the World Wide Web at http:i/ci.vail.co.us/commdev/planning/drb/meetinos/default.htm
Review Criteria
The proposal will be reviewed for compliance with the Design Guidelines as set forth in Title 12 (Zoning
Regulations) and Title 14 (Development Standards) of the Town of Vail Municipal @de.
Desion Review Board Meetinq Reouirements
For new construction and additions, the applicant must stake and tape the project site to indicate
property lines, proposed buildings and building corners. All trees to be removed must be taped. The
applicant must ensure that staking done during the winter is not buried by snow. All site tapings and
staking must be completed prior to the day of the DRB meeting.
The applicant, or their representative, shall be present at the Design Review Board Hearing. Applicants
who fail to appear before the Design Review Board on their scheduled meeting date and who have not
asked in advance that discussion on their item be postponed, will have their items removed from the DRB
agenda until such time as the item has been republished.
If the DRB approves the application with conditions or modifications, all conditions of approval must be
resolved prior to the issuance of a building permit.
Staff Aoproval
The Administrator (a member of the planning staff) may review and approve Design Review applications,
approve with certain modifications, deny the application, or refer the application to the Design Review
Board for a decision. All staff approvals are reviewed by the Design Review Board and any staff decision
is subject to final approval by the DRB.
Page 4 of 4l0li10/02
l-h-llDl-
trtr\
-ll-
ET
ETErd
-
a.rr|b
6EP-23-e! talla AFI al6N ox DEatGH t?l t49 {5?' ?'t'
o
F
E]LIil
E
iat\o
hF
E
eit6
bg
fl3
i-h-l
rl
4 a ru h'o-th{I,r7 t, a lfi i.
TOWN OF VAIL DEPARTMENT OF COMMTINITY DEVELOPMENT
75 S.FRONTAGEROAD
VAIL, CO 81657
970-479-2138
NOTE: THIS PERMIT MUST BE POSTED ON JOBSITE AT ALL TIMES
ADD/ALT MF BUILD PERMIT Permit #: 804-0144
, c3 Qo11
Job Address.: 660 LIONSHEAD PL VAIL Status.....: ISSUED
Location......: Lions Square Lodge roof Applied...: 06110/2004
Parcel No....: 210107201032 Issued ...: 06/11/2004
ProjectNo...: .J ffi3 o rZ ? Expires...: 12/08/2004
owNER IJroN seuARE cotlDo Assoc rNc o6/Lo/20o4 phone:
550 W LIONS HEAD PI,
VAIIJ CO
81657
L,,icense:
coMrRAcToR TI'RNER MORRTS,TNC. O6/LO/2OO4 Phone: 303-431-L300
5054 MARS}IAIJIJ ST.
ARVADA, CO.
80002
L,icense: 647-B
APPL,ICANT TITRNER MORRIS,INC. 06/]-0/2004 Phone: 303-431-1300
5054 MARSIIAIJIJ ST.
ARVADA, CO.
80 002
Iricense: 641-B
Desciption:
Re-roof same for same
Occupancy:
Type Construction:
Type Occupancy: ??
Valuation: $4.920.00
/,f I
4"isfl,*fuf
Firenlace lnformation: Restricted: Y # ofGas Appliances: 0
**t +t:t * ++ 'l:i*,*:+lt *a | *a't 'r
Building-> $111 - 25 Rcstuarant Plan Rcview->
Add Sq Ff 0
# ofGas Logs: 0 # of Wood Pellet: 0
FEE SUMMARY *:l**l|.rtr*tl***t'i***rt**'l*'r*1t*a++,i:r+rrt*a***:r**r*:**:r:lrr*.r**'.'t
So. oo Total Calcdated Fees-> 5186. s6
50.00 AdditionalFees---->s0. 00
S0. OO Total Permit Fee-----> $185 . 56
50.00 Pa!,rnents-----------> $186.56
Plan Check->
lnvestigstion->
Will Call--->
s'72.3r DRB Fe€ -- - - -
S0.00 Recr€ationFee------>
$3.00 Clean-upDeposit-.---->
$0.00
t:ta*trat+*:l*:i:|t*at I ta r:t *:t:|:lt* a,l l:|a *la r:l **'|*t,l:l:l 'lt't l.l ai+a
Approvals:Item: 05100 BUILDING DEPARTMENI
o6/Lo/2o04 Js Action: AP
Item: 05400 PLANNING DEPARTMENT
Item: 05600 FIRE DEPARTMENT
ftem: 05500 PITBLIC WORKS
*tt+ttt+t tittttat ti+*t{fa*rttrttl*tttta*a**aa*att*t**t*ttt***it*t*ta*t*a*ttt*tlt**tt*ttttt**l*itt ttt**tlltt*lt+lt*tlll*lllttlt*laari*lt****fll tll
See page 2 of this Document for any conditions that may apply to this permit.
TOTAr FEES-----------> S186 . s5 BALANCE DUE----->
DECLARATIONS
I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan,
and state that all the information as required is correct. I agree to comply with the informdion and plot plan, to comply with all
Town ordinances and state laws, and to build this stucture according to the towns zoning and subdivision oodes, desigr review
approved, Uniform Building Code and other ordinanc€s of the Torm applicable thereto.
REQI'ESTS FOR INSPECTION SHALL BE MADE TWENTY.FOI'R HOTJRS IN BY TELEPHONE AT 479-2149 OR AT OtlR OFFICE FROM 8:00 AM - 4 PM.
u/R t4-7 o
TIJRE OF OWNER OR CONTRACTOR FOR HMSELF A}.ID OWNET
PAGE 2
{' * ** * * * ** * * !* ** * * * * !*,}* * * * ** *+ * '}:t,}{. * *,} *!t * * * *+'**!t * * * *{. 't!'t{. * *,*,tr !t * ***** !t * !t *:* * '} ir *:t * + * ** 't * * **,* * * ** * * * * * ** * *,i *:8 * *
CONDITIONS OF APPROVAL
Permit #: 804-0144 as of 06-l l-2004 Status: ISSUED
** ** * ***'t*****.**,t ***'t:*******+**** '* *'l *,1'1.*'1.****+***'**:tr*'t':i*'t't**'**********{.***{'*'t*** * ** ***'t* '1.***:i,i***:1.** ****
Permit Type: ADD/ALT MF BUILD PERMIT Applied: 06/10/2004
Applicant: TURNER MORRIS,INC. Issued: 06/ll/2004
303-431-1300 To Expire: 1210812004
Job Address: 660 LIONSHEAD PL VAIL
Location: Lions Square Lodge roof
ParcelNo: 210107201032
Description:
Re-roof same for same
. Conditions:
Cond: l2
(BLDG.): FIELD INSPECTIONS ARE REQUIRED TO CF{ECK FOR CODE
COMPLIANCE.
Cond: l4
(BLDG.): ALL PENETRATIONS IN WALLS,CEILINGS,AND FLOORS TO
BE SEALED WITH AN APPROVED FIRE MATERIAL.
Cond: l6
@LDG.): SMOKE DETECTORS ARE REQUIRED IN ALL BEDROOMS AND
EVERY STORY AS PER SEC.3IO.9.1 OF THE 1997 UBC.
Cond: I
(FIRE): FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE A}.IY
WORK CAN BE STARTED.
Jun-09-01 l2:l5pm From-T0$l{ 0F VAlL C0t{lljfl TY BEVELOPIf,|I7 I r0178e452 T-001 P ocz
APPLICATION wlLL NOT gE ACCEPTED IF INCOMPLETE OR U
Pmject #:
Buildin
rcVNAPYNL
75 8. Fronage Rd.
Vril, Colorado 81657
rffi#*t*ti**.trtailritr-t*r+HH*rFoR OFFICE USE ONLYt**tt'**#rr!*sr*fffi s-|t.ll*l/r'jttttrtrr*r
"u0utlt----J
- otz>
-e<P
CONTRACTOR INFORMATION
G€neral Contrecior:
'-12 r,,u ?,<- 1.,L1-,2,( r >'""rq+:"s"'Contact and Phone #$:-7i ,,--r /H.,ctr s 72'-' ?il ) <
Emall rddrc$$: ff,-n p p\ L, { r t., €) rn _^ lL., I i. l< _ u,t e-,
'r.-------.- -,/7/.
COiIIPLETE V BUILDING PERIIIIT &
t l- .1
BUILDING: $ 'f-/ :C'ELECTRICAL: $OTHER: $
PLUMBING; $MECHANICAL: $TO I-AL: $
For c at 97A4284610 or vbilffibr$ z lc l(7 Z o,c,
Job Nerne: L, a ru 1 qte,4,2, il1.4(.2 JobAddre$i: I - .( . (,7; " - L l- .'--rt, l-1 tr: l\ t1 it'7
LegalDe$ctption ll LoI 1 ll Bloclc I Filing:Subdlvision: !*, J /,-"rLJ fiL I A1ittffi-nersFffir.ss: /cc .- ;:alrr_'r t'/y.. Iii:1"1]Z 11j,/,y_
ArchitEcvDesigner: /.J /.1
AddresE Phon6:
Ei€i ll Phone:
GEii&itGEfrEii6frTtToiii :
Lrr.'..\ t't-.t(-..,-.t ,,.n1, s,-.Lr .,i .^, i 3t-/
w""il; *"*Tffiaition( ) lernodel( ) R+ai:tV oemol I other( ) ..
vvork Type Interior ( ) Exterior (). Both ( )Ooes an EHU oxist at ihis locetion: Yes ( ) No ( )
Type of Bldg-: Singla'iarnlly ( ) Tw+farnily ( ) Multi-femily fi.) Commer€ial ( ) Rcslauranl ( ) Other ( )
No, of Existing Dw€lling unlti in this building:No. of Accommodation UniF in th'F buildhgr
No/Tvot of Fireplaces F:istins: Gcs Appliances ( i Gas l-cgs 1 ).-Wood/Pellgt ( ) Wood Bu
Noflype of Fireplaces Proposed: Gas Appliances. ( ) Gas Logs i ) W od L
Doeg a Fire Alarm Exist Yes ( ) No (Eo*r-tF-rr-EFfrnkEi-SystemExist YeE( ) No( )
L,L
Jun-03-01 I?:lSprn FrcirT9llll 0F VAli. C0ttlUlIiTY 0EVEt0PlEllT s701?s2152 1-001 P.003 F-06C
Questions? Cail tite Building Team at 479-2325
Department of Com munity Development
11 C'.,^.,: <'><., c1 ,A,( <<, L-(., <.,:,
il
f
)
ffi
TOllJ,N OFIfiIIW
Project Name:
Prnject Address:
i.J
n
o
tr
Tib.€ltgcklirt must he ampleHd bcfo-p,a EuiHinP turmit-apolica-$on E
ACfrDW.
All pages of a2plicabbn is complete
Has DRts approval obbined (i: required) Pravlde a copy af apprcval form
Condominium As5ociatiqn letter of approval attached if projecl is a t'lultFFamily comple"X
Co.:1plerc site plan submitted
Fublic Way Permit application incluCed if aoplicable (refer to Publlc Works checklist)
Staging plan included (refer to Publlc Works checklist) l{o dumpfter,safkino-or materi-al ttora(|g
gllorlved on roadwavs and shoulde@
Asbestos test and results submrtted if demolittbn is occurring
Archilect stamp and slgnature (Al Cemmercial and Muiti family)
Full floor plans induding building sections and elevadons(4 sets of platts for Multi-Farnily and
Commercial)
Window and door schedule
Full structural plans, including design cfiteria (ie.loads)
Structural Englneer stamp and signature on structuEl plans (All 6s669rcial and Multi Family)
Soils Report nrust be subntithd Prior to fcoting inspection
Fire reslstive assernblies specified and penetrations indioted
iJ
'l
l
J
o
f"l
IJ
Smol€ deredors shown on plans
'Types and quantit/ of fireplaccs shown
Date of subrflittil!
F:/everyonqfonts/blCp€rroz
Rcceivcd By:
Jun-09-01 l2115pm Fronr-TCllfl 0F VAl. C0HUi{rTy DEVELOPtttlT si0179215?r-00r P.001/018 F-060
BUILDII{G PERMIT ISSUANCE TIME TRAME
ff fri$ permit requires a Town of Vail Fire Department Approval, Engineer's (Public Works)
:'eview and approval, a Planning Department review or llealth Depaftrrent teview, and a review
by the Building Depadment, the estimated time for a tctal revlew will take as lonq as three (3)
tveeks.
All commerclai (lar'ge or small) and ail multl-family permits will have to follow the above
mentioned maxinium requirements. Residerrtial and small projec-s shou.d take a lesser amount
of time. Howe'rer, if residential or smailer projects impact the various above rrrenbonec
departments with regard to necessary revianr, these projects mav also take three (3) weeks io
review and approve.
Every atternpt will be made by thls departrnent to expedite this permit as soon as possible.
I, the undei'sigrred, undersiand the plan check procedure and time frame. I also understand
that if the permit is not picked up by the expiration date, that I must still pay the plan check fee
and that if I fail to do so it may affect tuture pernrrits that I apply for.
Agreed to bA/:
F: girr4ronE form$/bld perm3
Jun-09-01 l2r!6ptl Frcn'TC[4t{ 0F VAlr C0}'fr4UN TY DEVEL0PIEIIT si017Et45l
WHEN A *PUBLIC WAY PERMTT" rS REQUIRED
PLEAST READ AND CHECK OFF EACI.I QF TI.IE FOLLOWING QUESTTONS REGARDING THE NEED FOR A,
"PUBLIC \4/AY PERMIT":
T-081 P 006/016 F-0$U
J
f
tr
f
o
o Is alry drain€ge work beig€rdone that affeqts the ltight-of-woy, easements, or public property?
YES NO.JZ
o
LJ
ls a "Revocable Riohtgf-Way Permit" required?YES Na-rZ'-
Is he Right-oFWay, asq(enLs or publh property*' to be useC fcr sraging, parking or fenoru?Yss.--- NO q
If answer is NO, is or fencing plan required by Fublic Worlts?Yis-- N0
lf you answered YES lo any of these questions, a "Public Way Permit', must be obtEined.
''Public Wby Permit" apFlicdtions rnay 'oe obtained at the Pubilc work's office or at Cornmunlty
Development (a sampb is atteched), if you have any questions prlease call LeonarC Sandoval in Public
Is this a new residence? YES NO
Does dernqlition wod( being peformed fequire the u# ayv Rigfrt"of-Way, easements or
public properv? YES__- NO_I_-
Is any utillty work needed? YES--- NO---4
Is the dri,/€!yal/ being repaved? YES-- NO-'t /-
Is a dfferent acce5s netied to tJre site other than the exbting driveway? vre pz/ nO
Vr'afks at.t79-2198.
I F|AVE READ{ND ANS\'VERED ALL Try ABOVE QUESnON5.
/ rr(
Company Name
lob or ProJect Name:
Date Stgned:
F:/f,cn/onqferms/bldperm4
.,.C 6J--
Jun-09-01 I Z: l?pn Fron-ICtll 0F VAiL C0[*{Ut,tlITY OEVEt0PlfllT 9T01792452 T-001 P 008/016 F-060
PUBLIC WOR,KS AND THE PUBTIC WAY PERM$SBSCESS
I{ow it relatss to Building Permits:
i Fll out the dtttsched check list wth the Building Pem!! 4prclon.
If yes was ans'yvered to any of the questicns then a "Publlc Way" permit is required. You
can pick up an applicatisn at either Community Developrnentn located at 75 South Frontage
Road or Public Works, located at 1309 Elkhorn Drive.
> Notlce stgn-offs for utiity cornpanies. ALL utrlities must field verifl (locate) respective
utilities prior to signing application. Sorne utility cornpanies require up to 48 hours notice to
schedule a locate.
i A con$trudion traffic control/staging plan must be prepared on a separate sheet of paper,
An approved slte pian may also be used. Thls plan wlll show locatlons of all traffic control
devices (slgns, cones, etc.) and the work zone. (area of construction, staging, etc.). This
plen v/iil expire on November lst and wlll need to be resubmltted for consideration fof
approval thrcugh the winter, Be aware that your resubrnlssion for winter may be denied
depending on the location of constructlon.
> Sketch oi work being performed rnust be submitted indicatin€ dimerrsions (lerrgth, width
and depth of work). This may be drawn on the tralfic control plan or a site plan for the job.
> Submit comcleted application ro the P'Jblic Work's office for review. If requireC, iocates will
be scheduled for theTown of Vail electricians and irrigation crew. The locates take place in
the nrorning, but may require up to 48 hours to perfonn.
> The Public Work's Constructlon Inspector wlll review the apptication and approve oi-deny
the permit. You will be contacted as to the statrrs and any requirements that may be
needed. Most permits are released within 48 hours of belng received, but please allow up
to one (1) week to process.
F As soon as the permit is approved, the Buitding Department will be notified, alloviing the
"Building Permif' to be released. Please do not confuse the "Public Way Permit" with a
"Building Permit".
F NOTE: The aborr€ proce$ is for work in a public way ONLY' Public Way
Permits are valid only until lrlovember 15th. A new Public Way Permit is requlred
each year if work is not complete. Re-application each November 15th does not
mean an automatic lenewal.
ve read and und
F:/ever?one/fonY}9/bldp€rns
d the above.i/
-----. (/,\/o't
Dafe Signed
Jun-03-01 l2:1lpm From-Tltff 0F Vr^lt Cotilli\ilY DE\IEL0PIfI{T 9?017921te
DRAINAGEANO CuLy_ERr rNSpECrrQ[g ARE REOUIRED BY PUBLTC WORKS!
Please rerd snd c[eck off each of the items belorv:
o The Town of Vail Building Depaftment has developed the foilowirtg procedures to
ensure that new constructron sites have adequately established proper drainage
from building sites along and adjacent to Town of Vail roads or streets.
s The Town of Vall Public Works Department will be requlred to inspect and approve
drainage adjacent to Town of Vail roads or streets and the lnstallatlon of tetnporary
or permanent culverts at access points from the road or street onto the construction
s;tr, Such approval rnust be obtained prior to any requests fur inspectlon by the
Town of Vail Eullciing Department for footings, temporary electrical or any other
inspectiorr. Please call Leonard Sandoval at 479-2198 to request an lnspection fronr
the Public Works Deoartment. Allow a minimunt of 24 hour noiice.
o Also, the Town of Vail Public Works Department will be approving all final drainage
and culvert installation with resuiting road patchlng as necessary. Such approval
must be obtained prior b any Final e-eftificate of.QEegeang i$suance'
Agreed to by:
----- 1t .,4 '\
/t,-, /''u''' \
Print Name<-.::--:---'---_-=--
Signaure
Project Name;
Date Signed:
l-001 p.009/916 F060
F:/ev;rr,cne/fof ms/bldpem6
Jun-09-01 lZrlSpttt Frcm-l0lril 0F VAlt C0[t{Utl IY OEVEL0PEi|1 s?0178245 i
M ATE RIAL STO,BAG E AIN p -c.OilgrRucr r o N PARKr 1{ G
Please read and dreck off each of the items below.
(Copies of complete tsd are avallable upon request)
CODE 5.2.10: DEFOSITS OIT PUBLJC WAYS PROHIBITED
o Unlawful deposits: Subject to subsection C thereor, rt is unlawful for any person to litter, tmck or
deposit, or cause to be littered, tracked or deposited, sand, gravel, rccks, mud, dit, $no\,\r/ ice/ or any
other debris or materigl upen Any street" sidewalk, alley or publlc place, cr any portjon thereof.
E Notice; Abaternent: Th€ Director af public Works may notifl end recuire any person who vhletes or
cau-ses arK,thei to violate the provision of subsection A hereof, or who has in the oirector's employme!:t
a person who violates or causes another to violate the same, top remove sud', sand, gravel, rocKi, mud,
dirt. snow, ice or any other debris or material within twenty fout (2a) hours after receipt oi seid notice
by the Director of Public Works, In the evcnt the perscn Fo nctified does not cotnpiy with the notice
within th€ per lod of tlrne herein specified. the Directgi' of Public Works, or other authofized agent, may
cal}seanysuchsand,grave!,rock5,mud,dlrt,snolv.icerdebrisoranyothermaterialtoberemovd
from any street or alhy at the expense of tie notified.
o Summonr and Penalty: As an ilternative to the notice for removal provided in subsection I above,
any person who violates or caus€s another ta violate the ganre, rnay be is5ued a summons to appear
beioie the Municipat Cauft of the Tolvn lor sald vlolaHons, and upon being found guilty of s violation
hereunder be punishe.d as provided in Section 14-1 of BtiS code'
o Notice and Penalty: it is unlawful for any perran to fail or lefuse to carnply with the notice trf the
Director of Public Works as prodded in subseciiorr B terecrf, and any such percon shall, itt additicn to
payment of the expense of removal incurred bv the Director of Pr''blic works, alt prov'ded in suh;ection B
heiepf, upon being found guilty of a violation hereunder, be punishable as orovlded in S€ctit)n i4-1 of
this Cocle" (1997 Code: Ordinance 6 (1979).
CODEs 7-3A-1 AND 7-3A-3: PARKII{G OBSTRUCTING TRAFFIC & IMpOUNDMENTAUTHORIZFI)
o t{o person shall park any vehicle upon a street or at an'/ other place within this Municipality in sirch a
rnanner or under such condit'tons .ls to interfere with the frec nlovement of vehicular traffic or Proper
street or highway maintenarKe. (Ord. 2(1968) 5 f )
c Whenever any police officer finds a vehicle attended or unatr"endecjr sfanding upon any Pottion of a
st re€t or upon any pl6ce within this Municipality in such a rnanner as io ccnstitute a Violation of any
seqtion of this Artiile, or left unatended for a period af twenfy four (24) hours sr more and presumed to
be abandoned under ttre cDndiUons prescribed hy Colorado Revised StatuGs section 42'4'1102, as
anEndedf the officer shall require Lhe vehicle !o be rffloved or cause ]t tp be removed and placed in
sto6ge in tre neareit garage or other place of safety designated or maint-dined by this Municipaiify, and
the c-harges for tanin! and rtorage of such vehich shall be chatEed tc the owner of the vehicle in
aldition [o a ten dollai($lo) impoundrnent cha;ge. (Ord. 2(1968) $ 3r ord. z8(r98l) g X)
I have rcad ard *ilt comply with thc ahovt code prorisions:
PcrrlLion or Relatioffrhap to Proier rt - (. :j{-:-:J:-:-- "'*""'"-
Datc Sigo{:d:
T-001 P.0r!/316 F-080
I :/r:vcryr".nc/ft rm s/blri 6m r
Jun-0I-01 03:38pn Fron-T$fi 0F \IAIL Cf,ilWln EVEt0nEilT v01tc?162 I-08r P.00e/003 F-031
Prors6tl||mil
PruilsttDcxtlFdonl
Daslgn Rerdew Board
ACTION FORM
Dcil'fngtt of Cmmunity DwebPmcnt
zs solltl FronbsE Rp|+ v.ll elsl6 816t- -dr9mrd2139 hr970,479.245e
webl www,d.n[co'ul
tloorhcad Re-roof DRE ilumb|n DRB0/10218
tuptlce erdsdnE rubbcr membnne ntof under eddtng deck fof uilt 319. Deck wtll be rcbuilt
ovrr the rcof ssme frr 3!me'
Plrddprnt*
OVNER uONSQUAREoNDoASSOCINC05/28/?00't Phone:
660 W UONS HAAD PL
VNLCO
816',
Llcns€:
AppucAI-tT TURNER MORRIS, ilr, 05/2El200{ Phonc:
5054 MARSFIAU ST'
ARVAOA
c0 80002
UcBnsr:
Prod.ctAddr€$ 660 UONSHEAD PLVAIL
Lrytl Dcscrlptlon: Lotr 1 Blod<r Eubdlvlslolt! VNL UoNSHD FtL l ADD 1
P|rcd trumbrr: 2f0$7201032
conmcnt$ sEE coNDmoNS
Locslon! 660 W. Llotatcad Elrce
Hodql !y!
Sccond ly:
votr!
Conditlorur
BOARD/CTAFF Acnof{
ACdON: STAFFAPR
Drtc of Approvlh 0610712(tO4
Condr I
(n cr.l): Ho ch8ngss to th€e plons mry be madc without th. wdtten conlfil ol Toun of
vEll *rff rnd/or the ilpropilate reMew commlrc(s).
cond; 0
(P[-AN); DRB apprcval do€s not cpns8brto I permlt br bulldtng, Plltsc corEult wlth
Town qf Vafl Bulldlrrg pcrsonnd prlor b coffi$ucuon rctfvtues,
6nd:201
DRB apprwal sholl rrot becomo valld lbr 20 days followlng thc dale of approtEl.
Cond: 202
Apprc\ral ol6rB project shall lame rnd bccome nold onc (L) year followlng the date
oi ilnal apgroval, uriless r bulldlng pcrillt ls lssuod and consfrucilon b omrnenced
end le dlllgcntly pursued towtrd complolon,
Jun-07-01 08:39pm FrcrFlOSl{ 0F t/Alt C0ilUln EVEL0PiE|IT al01ll21t2 T-087 P.003/003 F031
Plannrn Glare gl.oaa DRB FoPald; 12!0.00
l-"
!ffizoor tnrff,fs:lHffie8?*lng P€sc2e
R.que3H llts9ectlltb:- InaD€don A!.a:
SlDA(llrcor!
ArFfD lntbrmrtlon
4.il!,lr gr+O144 TID€: A-ilFCotdTypi: Occwa,-ri*tt:OUrac Llctil SCA,TARE CO}.IDOA,SSOC lI{C ETALApplh.ft It R!\ER lilORRlS,ll{C.
cfln[ecbc lLrRtiER llORRlSJl{C.
De3cl$dm: Ra{oo? !iln for stme
R.ouestld Incp.cfon(3|
5ffiy, t"e*tbcr 10, 2(xr.l
$O IJOT{S}IEAD PLVAIL
Ltoffi Squtr! Irdgeroof
Sub Tbr: AllF Strrhr:[hc: lmpftm:
Phone: 3tF-{31-t3tx,
Ptpm: 3[10.{31-130O
Rcquc.bd nmc: 08:00 Af,- Pllonc: zlG*I$2668
Eril.r.d* DGOLDEN f
ISSUED
.nM
g0 BU)G#lml
Tr.RtGR ltoRRtst,tNc.
lrroccdon Hlrbnt
lbm: 226 FIRE DEFT. tlOnFlCATtOl.llbm: 10 BLDCr.Foodms/Sb€l
Item: 20 BLDo.Fo|fl6[orvs:te.l
3tl BLD@Fnmlm
5O BllXi-lnruhbndl BL"ocl-Shectock l.bll
70 8|-DGiltsc.g, BLD(}Fhal2l PLA'SILC Foud.don frn
22 Pl-At$lLCShPLn
lbm!
Requodot:
Coflid||ilr:
AgUnodTo:- Aftr Tlne Exp:
lbm:
lbm:
lbm:
lbm:
lbm:
lbm:
lbm:
REPT131 Run 233L
*zo
J
LLEo
]L
E,(,
oo
c
oo
-9,
E
:
'(g
(D
o
E
o
op9!,, H- o'o6 tE; :E3 *B3 igF ?63 FE.i ;!F *5e 6e
*. **.ei=g s E€
=O^OEEi!
"E€6e EEIt6 SL I
E gT^E
E!:*i:E E50(gqE*s;€E9!i;; PE6rs>9(,o;:I! .?t E* LF q
F 36-Est5-96
-=' o N 6:Eg<)<t eo- o
Et=:
ETEH?ooo
;i,E*
oo
;i-
o-+E-o
Lu:))l
:rt
rv
u.lfJ
tr)
lr)-
cv
IIJlJ
+
$l
(o(o
(0
<t(\t uJ-lJ
It
ulf
J
t*
c\l
UJ'-t
J
:lr
tIJfJ
It
IJJf,
J
It
IUl)
ut:)J
o,(o
+
IIJ:lJ
:lt
uJlJ
Lltf,J
IIJl f)
t+
s6(!C6oiE!
eEIo rJ.l ;<
IJ.Jf tIJf
:rt
bgN$
ullJ
*t
;!t-
IIJl)
ft
f(o
F.
o:lr
N
UJfJ
I.IJ:J
+t
be
UJfJ
:l!
tlJl)
:r+
;eF-lr)
f UJ:fJ
{*
IJJ
J
;et-
UJl)
lt
IJJf
It
uJfJ
tlllJ
ulf
$?bo
39eo,9 -rifr!.
=
-:<c
c
=ocl<c
ol
c
3
ot
N
c3o
L
f\
s-
(o
ro
;$
3
c
c
c3oci<c
ro
;
c
c
=cLc
=
c
3
c
..:<c
c
=o
c
oNa-
c\l
c
3oc
c3
Yc
c
3o
-:(c
f
rt)
F.-{
c
3
-)<c
=
c
ott)F
o
3E!
9-e o
,, <;<
be
F.
;e
t-
;{
F.
bS
t\l'-
;e
F-
;!
f-
;e
F.
;e
t-
ie
l'-
;e
F-N
;e *t-"'ero ;e
F-
;e
F
;e
l'.
be
N
;9ro(l-)
;elr);e
t-
;e
f-
;e
t-
o
C"
Eo)r
E ga
oo^i
',49
f.-
(!)(.)
@o,
@-
N
f.-
rsr
Ntr)
Al-
co(\l
tn
ri'r+
co
c')N
C\Itf,
il
$*
ad
F.-
C\I
co
$
-(.,@ F.
C\IF-
@-o
-l
c'i!i
ln s
(o
o,
s
l'-{
(\
@-
root
o
Ea
=s
olo
co
N
F.s
@
@
C9F.
;
F.
C\J
o
lf)
\(.)
t.
cli flr(\l
F.
C\
-rc_$_
('J
Nt
lr,
F*
a Ln
oi
roF-
o)_
rf)
s
lr)cfl_
o
=o
o9^{iell(,!.
bEg
s
o
sl
t
cr)
r+
F.
o
t-
(o
to
@
<.dt(\l F.
(t*
d(!<f !+
*\F-
+
t-@-
@
@c',
o,(f)
to.
rf)
F-
f-
c')
r.r)N
rEe
u*s
(\I
CD.
.(t
c\t
@$@
Nsf
s
crt
@
C\tro
f..(o
C\l
(o
(o
t--C\I
(.)co
tr)
cri(9
F.N
F-.
|r)
F.F.
(r)
@N
co-
tr)
N (\J
o).o(o
N:--
C\J
rod
|tj$
t\.+.
o)
C\I
(\Ic!
@-
ro
o
tt)-
o)ol
S-.,,'-
Eg
CD(.)
(v N
(D
@-
(\J
o F.
r+
(\lc!
(f,
@
rt
(')-
N
+
F.
|r)
$
N (\j
o)c\l
ottr)
1r)
F-
$
lf)
(\l-
lf)Nc\
@t
.f
F-
ro-
(o
oo,(o-
@(9 rr)F-
lir
lr)
|\-F.
l-ot
c\t
€D@
CO
at
N
C\J o N c\l
O
O
c!
O
N N c\l C\I N
o
ll
=oI
>s
;ef,O) !/sr*
.<|.6=Iod
F.It
oo N oo
N
IL
I
LL
oI
C\I c!
-j
o
o
E(!zo
3
@
oI
o
o
G
(!I
Eoo
oo
atto
oo
tr
|E
UJ
C'E
PJ
@g
ott
o(t
ooittoJ
.EN
UJ
9
o
o
9J
ta
G
E!
oJ
oo
oJ
oofo
J
ott
o-pco
J
at
cd
(\,1
ano
at,
G
o
oJ
o
Eo
-toEo
J
ql
ott
o-
oz
o
(5
tro
a
J
ottoo
ooo
o
J
o
oo
E6o
u,
o
J
(!
.d
o6to
o.
6o
o
t!
ottEoJ
g,
oo(u
tt
a!o
o
6o
-l
J
6
=o
F
e
o
E
oo
o
o
oE
o
o
E
.Ct
o
6oo
oo
F
6|
6
(!
o
o
Goo
G
o)EoJ
o
=
oA
o
to
c(g
o!
'-
6o
=
d)oEa
ooE
antop3ooEcDo-iooTA
€!uaiDR?P:I6Ti<6trtrtoq5J(JE
o
Design Review Action Form
TOWN OF VAIL
Project Name: Kenny's Double Diamond Project Number: nlr
Bootworx
ProjectDescription: Re-paint
Owner, Address, and Phone: Kenneth O. Friedman, P0 Box 1110, Vail, CO 81657' 476-5500
Architect/Contact. Address. and Phone: same
Project Street Address: 500 E. Lionshead Circle I #22 & #23
Legal Description: Lions Pride lLot l, Block l, Vail Lionshead Filing I
Parcel Number:Building Name: Lions Pride
Comments: Painting to match existing / repair of existing woodwork
Motion by:
Seconded by:
Vote: €t?
Conditions:
motion by
seepndeS
Board/Staff Action
Action:Staff Approved
cEEli{ions
Town Planner: Brent Wilson
Date: Ill0ll99
Project Name: Bootworx
Document 1
DRB Fee Paid: 520.00
qucstio,,l:a,ll thc Pliu rnilr g Stat i u.,.i ?:r-l 1 2.J
MPLICATION FOR DESIGN REVIEW APPROVAL
GENERAL INFORMATION
Thi.s application is for any projcct rcquiring Desigr Rcvicrv approval. Any projcct rcquiring dcsigr revicw must
rcccivc Design Revicw approval prior to submitting for a building pcrmiL For specific informatron, sce the submittal
rcquircmcnts for thc particular approval that i.s rcqucsted- Thc application cannot be acrepted until all the required
inlbmration is submittcd. Thc projcct may also nccd to bc rcviclvcd by thc Torvn Council and/or thc Planning and
Environrnental Conrnrission. Design Rcvicrv Board approval cxpircs onc ycar after final approval unlcss a
building permitis issued and co$tmctiotr is startcd. -7= € f€atFeRj# cosor>
LOCATION OF PROPOSAL: LOT:_ BLOCK:_ FILING:
PFTSICAL ADDRESS: ).- r vl s Pd r a€ 5:€ €, - .l-, t o,,ts g 6a e- ret4 +a+4ra
(Contact Eaglc Co, Assqssors Officc at 970-328-E640 for parcel #)
A.
B.
C.
D.
E.
PARCEL#:
ZONING:
TAWN OFUAIL
DESCRIPTION OF THE REQUEST:
t 9'Tt ^f
€otrt€4c, A tr a orZ6
NAME OF OWNER(S):tZ €a al€'zal e, - -r- E 1Qp1na;i
MAILINGADDRESS:
F.
c.
OWNER(S) SIGNATTJRE(S) :
NAME OF APPLICANT:Ortr4.J
MAILINGADDRESS:
H. TYPEOFREVIEWANDFEE:
E Ncw Construction - $200 Construction ofa new building.
tr Addition - $50 Includes any addition where squarc footagc is addcd to any rcsidcntial or
commcrcial building.
! Uinor A-ltcration - $20 lncludcs minor changes to buildinp and site improvemen8. such as.
rcroofing. painting. window additions. landscaping. fenccs and retaining
walls, etc.
DRB fees are to be paid at the time of submital. Latcr. whcn applying for a building permit pleasc identifu
thc accuratc valuation of thc projcct. The Town ofVail will adjust the fce according to the project valuation.
PLEASE SUBMIT THTS.A,PPLICATION, ALL SUBMITTAL REQUIREIIENTS AND THE FEE TO THE
D EP.{RTIVIENT O F CO IVIMUN ITY D E VELO PI|,IENT. 75 SO U-I'H FRONTAGE ROA D,
v.{rL. coLoRADo 81657.
rc,
D()UBTE DIATO]ID
EilM
B
SToRE: 9to4t655d)
520 UONSHEAD MAIL
vAtL coLoMDo ti557
OfFICE: 97(H75-2tO'l
fAX:97G4767129
P.O. 80X 1110
vAll colonADo 8t6s8"THE SKIER'5 SKI 5HOP"
oo
PAINTS
Cof or
Selector
ctz
tr
=G,
uJo-o
a
UJ
UJlJ-t
=G,
uJIL
fhh#Eht
Ir!IF
-+lrl
Tl
'"{ |
l-
x!6
=15
;^ l(J
-tZ<rf
uJF
E
F.
EFIz
=o
zz
s)
IJJF
2
oz
!
d)
€
o
=zo
lt.J
uJo
I
tr
(L
zH
4
ts
ts
IA
z
Ff
o
Eo
g
o
i
5
F\o
FF
A
o
(t)
(D
&.d\c'
=
c)
(o
c)Itoo
E
dt
E
o
=
f
p
q,
(!
3't
|l)
c
.9
v,
uto
o
a.
F6o{
(!
o)
.E
N
-o
3
F
o
=
(!
o
o
.2.c
=
"o
o
lt
(g
6
'
q)
$
v,
o
at,o
(!
a
-oF
(!
--;>cl
Eo(J
(E
=
6
c
E
E
o
;
=!>
Eoo
o
c)
Y
o)
io'= O)
EU
?d;: .=E-bs
cs'-o
ot(o€o'dt
=o;>c9'- o.
d0
!(6
so
CC;e
.:-
o(g
,n(t''- -c
EP
o!LC
O(!ie-c(u-a(EO
ar (D
9' (EE=
;5o(!
-YH
>g€9IU CLu,cl-o
-o
rn 6
@ X)<
\oc{
F
E
uJ
z
o
5
:<
IJJ
z
J
F
UJJ
uJ
z
co
=J
J
2
ul
UJ
uJ
z
F
uJ
uJ
=g
uJ
z
uJ
E
o-tuo
o-
z
X
F
UJo
o
uJ
uJt!
E
=
IJJ
oF
(,z
!
ql
J
9E
Fo
uJ)
uJ
z
=
d
J
2
IJJ
=
NOIIVN]VA
l
H
H
dFl
9rli
?r'l
UIq
o.i
u1H
4
h
fi
:
3zzvo ootr ^ 62q 5 :etr I oE66 EZr()oirn<)zxu-<oq iuJii
lf-rll.l.Xz
<Nc)
=>E
-I.i)i r,r,r .S
=!oN
zH
(t)
HXtrl
(A
14t
.J)
Fcl
FlFl
ts
z
z
tr
lJ
1
cc
f
o-
F
'P<x
o-
L!g.
z
Fo
z
tr
uJ
3
z
tltltltl
tzfzOaF: l!<oo<
=s>tr
8ci<z
Lz
a5zz-
do;trOI
UJl
cc
a
zY
iF
z
F
5g)z
3
F-l
F
Jl<l
FI
2_l
zl
.. >louloull!za
=
uJ(L
J
z
Eoo
&
Go
.JJ
3
FH
H
*J
COor-
tr!n
z
(J=
=edlo
=z
o-- I
EE="r -: Lrl6il>
bnn
tr
UJ
o
uJoz
loo
t
ao-
JFu.t :b=
(LuJ>(LOL9o. IIJ
:>
ut
II
uJ
d)
co
E
CL
-9o
Btt
.E
t
E
Eo
CI
llJF
o
UJ
tsooo-zo
Fo-
IIJY
uJo
oF
F
=*(Eo,
Ul r-r
o-
E-:r(J e.l
>.9.
o_ i;OE(Jo
t--llc)
ttoFoz
E
=E.lrl
o-zIF(JfEFazo(J
I
I
I
I
?lolurl
ECI
3l
ltlol
3l sOl rJrFI F
ol
..1
ol
uJl
5l
<l>l
t!lol
zl
3lolFI
=.1ol
uJl
5l
al>l
tl.lol
zl]lolFI
rn
Lr|
I
@
-lrl$lNl-l
dl
z.l
ull
5l
<l>l
ltlol
zl
6|FI
zHtq
4
tr
ol
=.1
url
5l
al>l
u-lol
zl
FI
lllltlil
H14Cf CJE('tr'1 -fHJqT
JI
Rfl3Elto
u-,1 <l
=l I
4Z
I
Ilr
I
I
I
ulul€(Iclc--l
EO
z
=l!
Ff
H
z
H
Fl
uj
=zo
_-)
Fl
rI1
tifr
z
EirI
b=
O
zt-
=<z.E
)zrro
z
f
uJ
=
F(J
Fzo
<o(JF
FS
\2u:o()
<F(rOl!<zE
azo
()
J'b l1aure: Lions oride Buildina
Legal ttescriPLloll: LoL-I-Ulock soo f ilittg
Tolil{ olr VAIIJ Col{sTltuc'r'IoN
luiu,riT AHPl,rcATroN {?lu'l
t991,0U't i f . iDATI'
Atldress ' P'o'Box 1325'Vail' C0 PlJ. 47
Plt.Address:
t
PErutL'yi;
3
. APPLICATIOI{ I.IUST IJE ITILLIIIJ,
ffi *i*****n***** * Jr ** ** * tt *'t * *'t't * *
tbr*., -lluircling [ ] -Plurrrbing I
Otlters l.laute : Lazier Ccnnercial
Archl"tecL:
Getreral DescrlPtion: Sear off &
tllork class: [ ]-I.tew [ ]-AtLeraLion [ ]-AtldiLiottal [x]-Repair [ ]'oLlter'-
l{unDer of Dweltitrg UttJ'ts i
-
l'lutrrber of Accolnlttodatl'otl unlts '
-f iretrlaces: cas Appliarrces- Gas Logs-- Wood'/Pellet-
llrrtrtber atrd Type oI !'rrePrilsss ' \'<r- 'rH1.--
E/ r,n,rr^.rr.,.nlJq * * * * rt tr rt * rt tt rt * * * * * * * rt t * * * * * * * * i t * tr
]l* ,r * * ,t * ,t l, rt * * tr tt * * it tt tr * il rt it tt * * * tt tt *
't
rt rt rt * VALUA'I'I Ol'lS tt 't
Yh . %1D-^ rrrn,r,rrrr,^r.r $ oruERs%Dt 86rlm0 trr,rc'tltrcll: $
Cat'z'^
our cor{PLE'r',rl,v olt rt TW" {?+ir;'tTrtl:fi [Ff:
pDlU.lII Il{ rOlU'14'I'IOl{ n * * * * Jt rt * * * * * tt !t't Jt * * * * **-* * * * * I
l-DlecLrloal [ ]-I{echanlcal I l-oLher
J'b Acltlress; 500 Lionshead 14a11
Vail Lionshead
dutr,ottlc: i 66o0il0
Illectrical Cotrl-racLor :'Iovttr of Vail Reg' NO
Pbone l{uurber:
Address:
PJ.urrrbing
Address:
Cotrl-racl-or:'l'owtr of Vail lleg. I'lo'
Photte l'lutuber:
t'lecltalrlcal ConLrac bor :'lown of vall lteg. No'
Phone l'lulnber:Address:
Jt tr * * I t t Ji t rt tt t tt * tr * * rt * * * * * tt * tt t * * rt *'r t:'Qll Ol'ltf CA US|l *'t * * * * rt * Jt * * * * * * * * :t t X]l* * * * tt * * tt
DUILDING PIIRI'IT IiEIi:
PI,U}II]II'IG PEIil,IIT TIJI':
I.IECIIAI'IICAI, PEIU'IIT ITTE:
UT,ECTIIICAL NIJD !
OTITIII{ 'I'YPE OT FDE:
DItl TEE:
lWli*Cotuuettts:-
.1-_.lSao
---
;f, : ii "",{"ffi I l $ ge.k'Igd#+
/ot'I]UILDING I'LAI{ CIIECK ITED:
I'LUMT.}II'IG PLAI{ CIIECI( TDE:
I.IDCIIAI{ICAI, PIJ\I'I CIIBCK TE83
IIIICIIBATION TEE:
CLI'N,I-UP DIIPOSIT:
5Q.lt'I'.VALUATlOI{IJUTI,DII.IG:
SIGNATUITI!:
z0llIllc:
T]IGNATURII !
Ci,EAlf Ut' IJIlL'CtSlT lLtrfulU, TO:O u " noofing, rnc'f P.o. "-. tl F?isco, @ 80443
ili
?5 soulh tronlage road
vall, colorado 81657
lscts) 479-21.38 ot 479-2139 oftlcs of contntunlly developmenl
Io3
rRoll:
DATEs
SUBJECT:
ALL COT{'IRACTOITS CURREI.ITLYI., REGISTERED WITII TIIE
TOIVN OF VAIL
TOl,lN OF VAIL, PUIILIC I'IORKS/COMMUNITY DEVELOPMENT
MARCII 16, 19BB
COIISTRUCTION PARKING & MATERIAI-, STOIIAGB
In sununary, ordinance l'lo. 6 states that it is unlawful for any
p;r;;;-t;"iiti"t, track or deposit any soil, f9"kl sand, debris
6i-m.t.rial , ipciucling tras5 clunrpsters, portable toilets and
worJsnen vehicles upon-any.streetl sidewalk, alley or public
place or any porti-on theieof . The riqlrt.-of-way_on all Town of
iail street-s incl roacls is approxirnately 5 ft. off pavement._
rhis orrlinance wiit Ue striitry enforce<t by the Town of VaiI
public works DeparLment. Persotrs found violating this ordinance
;iii-t".Ji*r"r-r.^24 lour written notice to remove said material.
In the event the persott so notifj.ed does not cornply with- the
notice within ttte 24 hour tine specified, the Public Works
ljepirtrn"nt will remove said rnateiial at the expense of person
nolifi.d. I'he provisions of this ordinance slrall not be
applicable to consti-uction, maitrtenance or repair projects of
a^n| street or al-Ley or any utilities in the right-a-way'
To review Ordinance No. 6 in ful1, please stop by the Town of
vait lluil_<ling Departnent to obtain a copy. Thank you for your
cooperat-ion on this matter.
nr ead :rnd acknowle<lged bY:
75 touth trontage road
vall, colorodo 81657
fioit 479-2138 or 479-2139 olflce of communltY devoloPmettl
OUILDING PIRIUT ISSUANCE TIME FMI.IE
If' thi.s pertlit requires a Town of Vai'l Fire tjepartntent Approval '
Ensineerl's (.Publ ic il;kt) ;;;;.; unJ it'ptouul '' a Planning Department
review- or tteat ttr D";;;;t'il',i-.uui.*, antl' a review bv tle Bui I ding
Departnent, ilie esii.,,riieJ"iiu,u for a total review nray take as long
as tliree weeks.
Al.|conmerci'a.|(.largeorsnnl])arrc|allnrulti.farnilyperrnitswi]l
trave tq folow'," l[oil il;ii6r;;-",iiin*' requi rerrients'. .,Residential
and snqll projects-lr,ouio iit" a lesser'iniount of time' However' if
resi.rtential or srna, i;;-;;i;;is-irrrfact the various above mentioned
i,;;;;ffii; witti regir,t'to-necessary review, these projects mav
also take. tlle three week Perroo
i
Every.attentpt:will Iie nratle liy this <leparbnent to expedite this
perr,rit as. s.aol as Possi.ble'
I, tlie undersigned, untlerstancl the plan check procedure and time
f ram.e.
F.
F*
re-
Conrnuni ty Development Department'
Plan Review Based on
the 1991 Uniform Codes
NAME: LIONS PRIDE REROOF DATE: l0-ZL-94
ADDRESS: 500 LIONSHEAD CONTRACTOR: G & G ROOFING
VAIL, COLORADO ARCIIITECT: NONE
OCCI.JPANCY: R.B ENGINEER: NONE
TYPE OF CONSTRUCTION: ll-lHR PLANS EXAMINER: DAN STAMK
CORRECTIONS REQTIIRED
The items listed below are not intended 3o be a complete listing of all possible code
requirernents in the adopted codes. It is a guide to selected sections of the codm.
The following is not to be construed to be an apprcval of any violation of any of
the provisions of the adopted codes or any ordinance of the Town of Vail.
I. FIRE DEPARTMENT APPROVAL IS REQUIRED BEFORE ANY WORK CAN BE
STARTED.
2. AT.IY I'NLOADING OF MATERIALS OR ANY STAGING OF ANY KIND MUST ON
ON LIONS PRIDE PROPERTY ONLY.
3. FrELD INSPECTTONS ARE REQUIRED TO CHECK FOR CI)DE COMPLIANCE.
Triwr-r sri Vail
,"\ffw.sffJ,,
INSPECTION REQUEST
TOWN OF VAIL
479-2138
JOB NAME
MONREADY FOR INSPECTION:
LOCATION:
PERMIT NUMBER OF PROJECT
onre l0l,l? /c
BUILDING:
tr FOOTINGS / STEEL
PL
tr
tr
tr
tr
tr
o
UMEING:
tr FOUNDATION / STEEL
UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATERtr FRAMING
,- ROOF & SHEER
" PLYWooD NAILING GAS PIPING
tr INSULATION POOL / H. TUB
tr SHEETFOCK NAIL
D
V rrrunl tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
O CONDUIT
D-
tr SUPPLY AIR
D
tr FINAL tr FINAL
APPROVED tr DISAPPROVED tr REINSPECTION REQUIRED
GORRECTIONS:
INSPECTOR
l /r. , ..tl'11 .Y-4|\''\) '
PERMIT NUMBER OIC PROJECT
INSPECTION REQUEST
TOWN OF VAIL
479-2138
-----6D
r 1'
la
iz'\ I -.,1 l. , IealE lL.r I i 'f /( 11 JoB NAME
READY FOR
LOCATION:
BUILDING:
T] FOOTINGS / STEEL
PLUMBING:
O UNDERGROUND
O FOUNDATION / STEEL tr ROUGH / D.W.V.
tr FRAMING O ROUGH / WATER
n ROOF & SHEER" PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL
O FINAL
ELECTRICAL:
tr TEMP. POWER tr HEATING
tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
tr FINAL
APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
INSPECTOR
Chronology of Events Regarding Storage on the Second Floor
October 20, 1994
October 24.1994
October 25,1994
october 27,1994
october 28,1994
October 31, 1994
November 2, 1994
of the Lions Pride Buil<ling
Michael Gross called to inquire about zoning on the second floor
of the Lions Pride Building. He said Vail Mountaineering is using
it as a warehouse and the building is having structural problems
as a result. At this point, he was not calling to complain but
merely to inquire as to the zoning. I called Vail Mountaineering
to confirm and talked to someone named Dave who said they
were using it as storage as well as their main oftice. He said
they are working with Gary Murrain to resolve Building Code
violations. Talked with Gary and he confirmed they are working
to resolve the Building Code issues. Gary has been encouraging
them to talk to a planner about zoning issues.
The owner of Vail Mountaineering, Axel Wilhelmsen, and Mark
Mueller, a structural engineer, came in to discuss this issue with
me and explained how the space is used.
Discussed this issue with statl and concluded a site visit was
necessary.
Andy and I visited the site and talked with Axel about how the
space is being used.
Had a staff discussion regarding this space as storage.
Concluded it is in violation oi the Zoning Code. I then called
Axel and told him that he has until December 1, 1994 to remove
all of the items that are being stored there. After a lengthy
discussion and a meeling with Axel, Mike and Andy, staff agreed
to look into this issue further and meet with Tom Moorhead to
discuss the legal aspects.
Staff met with Town Attorney Tom Moorhead and discussed the
issues and requested that he give us his legal opinion.
After talking with Tom, I set up a meeting for November 7, 1994
with Axel, Michael Gross, Tom, Mike, Andy and myself to discuss
this issue.
)
U
oI
o
(u
E
o
J
mark j mueller, p.e.
president
civil, architectural and
structural engineering
p.o. box2747
vail, coloraclo 8t 658
4762627
47C2637 (F/xl
4s+ftru,, ,fwVrur_
swPlu+ 7
'L'.cl-!t-t1
tlltc t-rcrrL' (;\o S 5
lolJt 4'l-;F
47b-788?
I
f )/)
Mt ivle\, N,tr'y', if
/, Ayd 4{i:lur | 6r,i,
/ T;',;,-,/$'Lfje, t\rrl'
)
2ol Gore c*."|?l::
?Jir]doiorooo etosz
4 ii,- ftt.,4 I&ttwitnetms"n
s1.x1%;a'"'NEC.
.1.'.., ',1,,,;,'-
il P.nr i. L -'..',
I ; lill,-:,;: ., \_-I \,l',r -irir, .'O f.
/
R E A L E S TAT E
Tl,t tl;sl,t I'c.'Pl.
October 31, L994
Tom Moorhead
The Town of Vail
75 S. Frontage Road WestVail, CO 8L657
Dear Toms
I am writing concerning a Lionshead office rental involving a very
good friend of mine, Axel wilhelrnsen.
Although there are always two sides of an issue, and I have only
heard Axel's, I an again concerned that the Town may be acting
overly aggressively without considering the practical economics of
a situation.
I assisted Axel approximately eight years to acquire Vail
Mountaineering. He has successfully taken a fledgling enterprise to
its present state of three shops: Vail Mountaineering, Gore Range
Mountain Works, and the vail- Nordic Center (which Axel runs for the
VaiI Recreation District/I}V, as welL as a nail order business
generating with sale tax volurne of approaching S50o'000.
As his business and staff grew, his office requirements needs also
increased. Recently Axel was able to take over the office lease
adjacent to his existinq Lionshead office - a space which had a
history of unsuccessful enterprises. He acquire this extra space in
order to supply the needs of his current business and his support
staff.
The apparent issue is the rnix 'use, anci the allccation of same
between actual, working office space and storage. As you can
inagine and especially at this tine of year, a skilwinter oriented
business faces a hugh influx of incorning inventory. A najor part of
the office work is to categorize, orqanize, and distribute this
inventory.
At this tirne of year the percent allocation to actual office and
additional inventory use will be different than during the rest of
the year. Axel's nulti store office is at the Lionshead l-ocation
and it represents the hub of his business and absolutely essential
to hirn and his managers and their support staff.
Brupcr Srnrrr Ar VAIL VTLLAGE Orncr . 230 Bnroce Srnrrr. Vet. Coloneoo 81657 . TeLrpNoHr: (303) 476-2121 . Fax: (303) 476-2658
Erdrdt,t A[il idc
Oran IATERI{/\IIONAL REALTY
I understand that the Planning and Conrnunity Development Departnent
has ruled that AxeI must vacate his Lionshead office location by
December lst because he is not operating an office relative to the
Town's lnterpretation of proper office use distribution.
l{hen you review this decision, I ask you to consider two rnain
issues. First, practical use of office space by retailers during
the entire course of the year as inventory amounts change. Second,
consider the ranlfications of denanding a business to give up itsofficq space wittrout . any prior warning at the start of its very
busiest season.
fn a general sense it would appear that once again the Town may be
acting more in a reactive rather than being proactive manner. Since
I have left my recent post as Chairman of the Design Review Board,I have received nany conments and criticisrn about attempting to get
things acconplished in a positive nanner within the Town of Vail.
I am aware more than rnost individuals of the abuses lire see in both
our building construction and commercial codes. Hoetever I mostfirurly believe we all must be more sensitive to the practical
realities of both the governing and interpretation of ourguidelines and the associated practical real.ity of situations.
ively submitted,
Project Appllcationr
Date
Proiect Name:
Proiect Description:
contact person and pn."" Alr<z- L'.)tt-\\raUr^":c;--J
Owner, Address and Phone:
Architecr, Address and phone: C *0f5 8f , -o $ - l -=t.- ^So4. ,
Legal Description: Lot Block Filing Zone
Com ments:
Design Review Board
Date
Motion by:
Seconded by:
APPBOVAL DISAPPROVAL
Summary:
(w{'l&'4
Town Planner
Date:
(.tru Approval
-I
I
u AL /ln00Nrft(t\\Fqt N(,r.\D P+t Nr_f_@-tNDogu_rcu
--
z) PmwT-'-Qgttrr,J-& -+ Lr A ilrs
-bL_QE, EXT€eIO_C __*,gft_Gr _
_ SET- _E_ftt-K_'
z) ru Etr-t €t aN oU eR Doo q
t(\) 3t 6k) Ae € SFe€- t {rc*lZd
re-muKALE- es-+!.
-
6U€k - -l^IJ-0J-.D 0l^r5-
- SLENE re- -_g,E--rlllloirK - ----A-t\)) --€ut/tl^€-L z'lA4 u nJst+r il5.
) flu_qQo _ _oru__gl€:_P, _W_AL=L, _
W-\L-JN--&-A ta-
T(Anr- Tor o '4L-ftP'
it..I
I Project Appllcalion
Project Name:
Project Description:
Contact Person and
o^rc L/atfst
hK, ootr, Bu;lJtps
K;t c e,tt,an,q)[ o9a6 - gaL(
Puor^, -7- Lr.z,on Pa B^,lSzr tJ^,t CLOwner, Address and Phone:
q/(,98 q76- {6to
Architect, Address and Phone:Nln
Legal Description: Lot
Com ments:
500 LlaD)ll1.tb €t6t7Un, I Cc
Block Filing Zone
-STIrCCA ' Ura',n\ (snr^r ^s llft^ I Lnst FAtt)
T('n'' fla,-,, fn,l - 3Ir4Te (nnt
Design Review Board
ir
nrta : l
Motion by:
Seconded by:
APPROVAL DISAPPROVAL
Summary:
,'\!
Date:
Town Planner E star Approval
to
3re1
r3rla
NAME 0F PR0JECT: LioP, Pai"' Du;lJi',
lEenr--besCnI PTI oN:
The following information is required for submittal by the applicant
Board before-a final approva'l can be fiven:
A. BUILDING IfiTERIALS: TYPE OF MATERIAL STNTP
Otlot Lnrsx
LIST OF MATERIALS
s:00 C Lr oLrtHeAa ,u,iatr tI"f
to the Design Review
COLOR
Cknn Lsn*, co/t at ftt?toou( t-n't Ftil)
STREET ADDRESS:
DESCRIPTION OF P
Roof
S'i di ng
Other l'la'l I Materi al s
Fasci a Brr^'o
Soffi ts
Ni ndows
Window Trim
Doors
Door Trim
Hand or Deck Rails
Fl ues
Fl ashi ngs ..
Chimneys
Trash Enclosures
Greenhouses
0ther STtLcLo
B. LANDSCAPING: Name of Designer:
pn0ne:
PLANT MATERIALS:
PROPOSED TREES
EXISTING TREES TO
BE REMOVED
Botanical Name Common Name Quani ty Si ze*
for conifers.
(over)
S lo t.
*Indicate caliper for deciducious trees'Indicate height
. " PLANT I"IATERIALS: Botani cal Name Corrnon Name Quani ty S'i ze
(con't)
SHRUBS
EXISTING SHRUBS
TO BE REIIIOVED
Tvpe Square Footage
GROUND COVERS
s0D
SEED
TYPE OF
IRRIGATION
TYPE OR METHOD OF
EROSION CONTROL
C. OTHER LANDSCAPE FEATURES (retaining wal1s, fences, swjmming poo1s, etc.) Please specify.
" . --l
L'.*-, ffu
Project lpplLtron
Proiect Name:
Project Description:
Contact Person and Phone
Owner, Address and Phone:
Architect, Address and Phone:
Legal Description: Lot Block Filing Zone
Comments:
i7
Motion by: lL t U a-'
Seconded by:
APPROVAL
Design Review Board
o^," 7/l '/ Y 7
DISAPPROVAL
3 -o
Summary:
E Stan Approval
ot
Design Review Board
Comnunity Development Departnent
July 1, L987
Appeal. of a staff interpretation concerning a signrequest for Lionshead Boot Specialists located in theLions Pride Building
Michael cross
The applicant wishes to place an awning with lettering on hisshop, Lionshead Boot Specialists. The staff feels that thisshop is on a second floor with its own entry, and thus isentitled to a sign of 5 square feet. The applicant contendsthat the shop is on street leveL which would allow 6.5 squarefeet (32.5r frontage divided by 5 = 6.5r).
The staff feels the shop is entitled to 5 square feet ofsignage including logo.
TO:
FROM:
DATE:
SUBJECT:
APPLTCANT:
-
ot
T- DR B af zt/a-
o
G'rao s s
,\--?
Ap plication Number
6"" rs6'c'-; i' 'f'Ll*
Fee paid Lltull -ft tt" -SIGN APPLICATION
oate GIF /at
Name of Project
Name of Person Subrnitting M,, -h,^e-l l\1. 6uo.9
Location of Project Saa " E . L,6nthe.. I Ma,lL t/s
Description of .Project
t , n Joru -, ,,,n L E "onl ,!"o. ,n n,l
The fol'lowing information is requ'ired for submittal by the applicantto the Design Review Board before a final approva'l can be given.
Sign submittal fee is $20.00.
A. Sign Material Svvt L,/*lla. - crryltc
Phone qzc- zezl
,1.
B. Description of Sign
C. Size of Sign lero*i,
Eep|h o { a,,* ^i. q 2t . o" - lelfev,-q I. he l;l't c-aer*a.l
,S- D/
D. Length of
E. Comments
v,/ntv'ro 7l'' Ltl
MATERIALS SUBMITTED WITH APPLICATION
6. Photograph of sign
1. Site Plan2. Drawings sE6iffi-9 exact location
e. Photographs shol.ving proposed 'locEFon _ -- _4. Actual sign _5. Colored scale drawing x
Approved for DRB Submittal
Diiapproved for DRB Submittl-i]
)lgn Aomtn tstrator
Sign Adminjstrator\
TTTTT OCIOOr 00TSr,rH m00F
17 JUH 1987 I,IEIINESOAY
RECEIPT * 46357
LIL'IHSHEATI FOOT SPECIALISTS
36s- E LITJHSHEAO CIRCLE
UAIL. C[. 91657
NEsIEIFTIOI.I.
b.IEI.I APFLIIATIOH
t:1l6gBE4l4l3
TL'ITAL
t::A5H CHEIK *
1lt5
v
UUUAIL
1l ,4gAn
28. A8
28. 06
RECEIPT BY
FOBO
:
ilp
IJ ,,q-? i'f l--'-<\L
62 il
t,, ,^ r
I\o.r ry.1-t------ \-tlttn
\\o
Ittr
\
a-
\cl
t {.-1n
\f.|
I.a
, t\l
'-s
Il
\,
,f'7
{
a
t'?
f\
#
EE
Ef
\v
\\
O -$--=_-$'tl1 |
Project Application
II / 4/87
Project Name:
Project Description:5C0 Lionshead Mall
Contact Person and Phone Kit l,lilliams 476- 0906
Owner, Address and Phone:Bob Lrzi er 6- 5610
Architect, Address and Phone:
Legal Description: Lot Block Filing Zone
Comments:
Design Review Board
Date
Motion by:
Seconded
Ji Q-.4 ,t -..
I
APPROVAL DISAPPROVAL
Summary:
Town Planner
tr/ 4 /87Date:
E statt Approval
r! . '
NAME OF PROJECT:
LEGAL DESCRIPTION:
STREET ADDRESS : s:ot t Lio-' Hena mc )/.
DESCRIPTI0N 0F PR0JECT: Re PAt'r -lL 8^itJtps
The following information'is required for submittal by the applicant to the Design Review
Board before a final approval can be fiven:
A. BUILDING MATERIALS: TYPE OF MATERIAL COLOR
O LIST OF MATERIALS O
N/tt
6Bon-., T<^tr colue
Fasci a
Soffi ts
l,li ndows
}Jindow Trim
Doors
Door Trim
Hand or Deck Rails
Fl ues
Fl ashi ngs
Chimneys
Trash Enclosures
Greenhouses
0ther
B. LANDSCAPING: Name of
Roof
Si di ng
0ther Wall Materials
< A m Le- BROtt^., c ulo n
SAn^z APOI il
p)n
N/A
CX,srt^,<Bn or..tts coloR
ttln
Desi gner:
phone:
PLANT MATERIALS:
PROPOSED TREES
Botanical Name
EXISTING TREES TO
BE REMOVED
*Indicate caliper for deciducious trees.
Common Name Quan'i ty Si ze*
Indicate height for conifers.
(over)
SAt^z LtLo*,t
. " PLANT I'IATERIALS: Botq!i!ql--[g[g- Aq@q! lleCIq Quanitv Size
(con't)
SHRUBS
EXISTING SHRUBS
TO BE REMOVED
GROUND COVERS
:,..
Tvpe Square Footage
s0D
SEED
TYPE OF
IRRIGATION
TYPE OR METHOD OF
EROSION CONTROL
C. OTHER LANDSCAPE FEATURES (retaining walls, fences, swirming pools, etc.) Please speclfy.
o. .'
-=4
I
I
I
a
o
I
o
o
o
o
a
o
o
o
o
o
t
o
o
o
a
o
I
I
o
o
I
I
o
o
o
o
t
o
I
I
o
o
a
o
o
t
I
o
I
..,, a.l
(L'
Ll
EL
c
i-
rJ
x
._
Cr'
,i: F E'
=trrJJ-a=-C -ufJil
I}-L-cl
T-1 .^ f ':.r rE,I -u lJ { t: 'f !t-. 4J t-LLliar,-.---9 -' '.-r rl i: I
_ a, .^ tn =, Et 3 Ll
:- C'l ;i 'E -Lf ir.r il !
=--fcrr,rt-i'lE= - = 'rr o: J.- u'l
='= ',,- - TJ Er .. *^: -, =rr; 5F;;4=E=-= ui:-=i-.F-iiD'f'-.,-E'o1io.===f= E'- - t- | .-, ..
=HE,r-Fr:il fii1 s:
:-i rrj 'J ._ ,J
.Lr rrL,r!lF!E
r- l- - t-L ii l-I
-- ,F .o -'"- L-r, rE .r-; ErLI !: Ct .=' L'Tr !- ,-l r-ft r-r- r.r- J r.tL L:r ur fr
11
q".1
I+
)
:,-r "Jlt .r-1., .1 I
O
l.
I
IJ
I
iI
T_
tr,1rl-l
-l
L?
.-'
lLr'ltr-|irl
(l'
CT
c
!_F
!_
trl
El
(J
v
h1
-F
I
I-ITI.l
II
E ^.snroEHll
-QEI'.-fim-tl*
.s:*rE*lt4OJO]CEF
==5ucr\LLIFF-;-tg.E.ss€F(J(J€>TT
o
o
o
o
a
a
t
o
o
o
o
t
o
I
o
o
o
o
a
t
o
o
I
o
o
I
o
o
o
o
o
o
t
o
o
t
o
o
o
o
o
t
o
o
::<*t[
X
I.!
I
F
F
I
fi;
a
.9
F
E
?
s
Blo
U)
lJ.,l
ztrl
L)
Ll.lz
#
-UJ
=oetr!'I
*
o
./',
Proiect Descriotion q b.J Y1 | n Vo
Contact Person and Phone
Owner, Address and Phone:
Architect, Address and Phone:
L€gal Description: Lot
Comments:
Block Filing Zone
-
-\!t)1
Design Review Board
Date
Motion by:
Seconded by:
APPROVAL DISAPPROVAL
\
tr
,^," =-f z r/ / -J /,st^n Approval
rMPoRrANJ
"zkilJ!' *'*"
WHIL9 YOU WERE
M
PLEASE CALL
TELEPHON ED
WILL GALL AGAIN
CALLED TO SEE YOU
U RG ENTWANTS TO SEE YOU
RETURNED YOUR CALL
LAZIER CO}II{ERCIAL PROPERTIESP.O. BoxVail, CO 8L658
3031476-5026
February 24, L987
10: Town of Vail
RE: Charlie's T-Shirts
We at Lazier Comn:rcial Properties approveCharlie's T-Shirts store front.
the requested changes
Lazier Comercial Froperties
plication Number
SIGN APPLICATION
z<-
Name of Project AM
Name of Person Subrnitting StXoe .4etZ*L Phone
Location of Project 5oo E. /1a"54<M Crzct f
Description of Project
o
Ap
Fee Paid
Date
ea)T
The followingto the Design
Sign submittal
information is requ'i red for
Review Board before a finalfee is $20.00.
submittal by
approval can
the appl icant
be given.
n.1A. Sisn Materiat khsmhK t/Zo KdD
B. Descript'ion of Sign
4.-^'*t
MATERIALS SUB|"IITTED WITH APPLICATION
l. Site Pl an2, Drawings sE6wTng-exact'location3. Photographs showing proposed location4. Actual siqn5. Colored sialEn-iuwing _,216. Photograph of sign
Approved for DRB
Djsapproved for
Submi ttal
uKb )uDml lta I
---
)rgn Aomlnlstrator
-
)1gn Admlnlstrator
-
;.ivr'ttlfif,l*
Name of Project:
t-egal Description: Lot Block
\ra- Description of Proiect:New Store Front
Flllng Vail Lionshead lst Filing
The following information is required
Board before a final approval can be
A. BUILDING MATERIALS
Roof
Siding
Other Wall: lvlaterials
Fascia
Soffits
Windows
Window Trim
Doors
Door Trim
Hand or Deck Rails
Flues
Flashings
Chimneys
Trash Enclosures
Greenhouses
Other
for submittal by the applicant to the Design Review
given:
Tvpe of Material
NA
Color
lX6 TGC Smoothsurface
NA
NA
NA
Double Glazed Panes (4)
lX4Pine
See Elevation
lX4Pine
NA
NA
NA
NA
NA
NA
NA
it
1..
B. LANDSCAPING
Name of Designer:
Phone:
PLANT MATERIALS
Botanical Name Common Name Quantity Size
TREES
t,--
!7 App'lication Number
Fee Paid #ao. an- 3(/qq7 SIGN APPLICATION
Date June 13, 1985
Name of ProJect Nit Nr Needle
Name of Person Submlttlng _ .lerry Meremonte
Locatlon of ProJect Lionspride Building -Lionshead
Phone 476-3051
Descrlptlon of ProJect New Store Fr:ont
The.fo1lowing lnformation is required forto the Deslgn Rev.lew Board before a finalstgn submtttal fee ls $20.00.
submlttal by
approval can
the appl icant
be given.
A. Slgn Materlal Pine
B. Descrlptlon of Slgn
painted border.
Business name in painted letters with
D. Corments Same approved sign previously used in
in the Village at the old business address.
I.IATERIALS SUBMITTED }IITH APPLICATION
Disapproved for DRB SubmittdT-
1. Slte Plan2. Drawlngs sh6fr'{fr6-Exact locafion X1. Photographs showtng proposed lociTT6i--4. Actual siqn5. Colored siatE-iliiFin-q-6. Photograph of sign - f-
Approved for DRB Submittal
2c> ft it--t 1e.t t{- .;lb",c.b<_
3 5 1.1,-*d{1'
i
I
)
I
o o
t-,
I
!
I
I
I
I
t
t
I
I
l
i
:
i
j t5 aoutt lront gc rcrd
nll. colondo ElttT. (308).rt-?00o
Aprll 17, 1984
T0: SIGII APPLICANTS
FR01'l: Tom Braun or Krlstan Prltz' Planners
RE: Sign APPIlcatlon Requlrements
l{hen appllcatlons for signs are subnltted, the followlng lnfonnatlon
ls required
l. Slte plan,showlng exact locatlon where the ilgn is to be located.
Z. photograph or drawing showing the bul]ding and where. sign ls to be 'located.
3. Exact deslgn of slgn (one or more of the fo'llovllng)
(a) scale drawlng or renderlng (must be colored exactly as slgn wlll .be)
(b) the slgn ltself ls made
(c) photograPh lf slgn ls made
FEE: A $20.00 appllcatlon fee wlll be requlred at tlme of appllcatlon.
offlcr of communllY dr'rrloPmont
(over)
Prol€ct Name:
Project Description:
Contact Person and
rrorecr APP[Garron
zii l< t
Owner, Address and Phone:
., , ti
Architect, Address and Phone: - *t{l il l,::t'-'r'rnr-'r'. nc.Y ! lG - -lt ' 5 |
Legal Description: Lot
Commenls:
Design Review Board
"'l.l* <Date , I Vl *' -'
Seconded by:
DISAPPFOVAL
Summary:
E statt Approval
'*
, "d ih ..,. ${ rI
Project Name:
Project Description:
Contact Person and
Profect Appllcatlon
Phone
(,,0\\ i'<<r
Owner. Address and Phone:
Architect, Address and Phone:
Legal Descriplion: Lot Block rFiling zon" ('(- ]-f
Comments:
Design Review Board
""'" 6/l'f i Kt
Motion by: L..--h*! n-\
Seconded by:
APPROVAL
I .'- t-i ,. L-i i' r
DISAPPROVAL
Summary:
tl , '': ,ii \, r/ .\Kr, 1 \r)\i,t{,I
fown Planner
'li'r ls..-7--
E Statt Approval
Project Appllcation
zl.r lx-s
Project Name:
Project Description:
Contact Person and Phone
Owner, Address and Phone:
Architect, Addr€ss and Phone: f rr(AI Jyldr""-1{^r>^ tf ({ l(a - -Ro 5 |
Design Review Board
"*" rldr 5
DISAPPROVAL
Summary:
E statt Approval
Project Name:
Project Description:
Contact PeIson and
Frolecr APP||Grr|on
zli l< c
Owner, Address and Phone:
Architect, Address and Phone:
Legal Description: Lot
Comments:
Design Review Board
'\rir r'^
Motion by: / 1' V L:i'
Seconded ov, ']' '- -l .ltv ' t f
nppRovnt /DISAPPROVAL
Summary:
"r-j
i,rl
\ --:
oo:Io
.E.I.C
e
h
EE
f;
rl
--r*
i
tf\ \0.aq
*t s\ss.\\\'$'
ii
:,
'
{J
N
.0
:tr
$
o
{.'l- la$:
I
!{
NI6l
1l
iF-'
NT
-\l--:_
rl
5'<I'
r:il
\J
-]
\
:
RulIs
{tI
u
f-7.!J
\-a
$
n-
{Jva
h
'lJ)f,ill
'lJ-a
O,
l
:l
I rrraarl ,,1* l-'auo1t
.
_{
F.$I
nrtl
fl
o
BETLhMIU i4ooRE,
qLo€'t)
ENAMZI-
BsllJAl,u\r t{off---vi li -t ntr'i\Furr
B€rrlmlru r.4o<)BE-
c8 33
E)crERtoGl. Ftor-ree
PAI\TT
Frer.o
€x1EF,l016, t{ouef:'
PAINtr
v U
Date
Project Name:
Project Description: "
Contact Person and Phone
Project Appllcation
4 'i;
Owner, Address and Phone:
Architect, Address and Phone:
Legal Description: Lot
Design Review Board
o"t. i t
"('
Motion by:
Seconded by:
APPROVAL DISAPPBOVAL
Summary:
Town Planner
Oate:
;
El statt Approval
,'.9^5 o.t
.9
.:I.bla .-_:_ :'.-_
LIST OF MATERIALS
NAME OF PROJECT:
LEGAL DESCRIPTION:
STREET ADDRESS:H^.ll
DESCRIPTION OF PR
The foliowing information is requ'i red for submittal by the applicant to the Des*;n Review
Board before a final approval can be fiven:
A. BUILDING IVIATERIALS: TYPE OF MATERIAL COLOR
Roof
Si di ng
Other Wall Materials
Fasci a
Soffi ts
Wi ndows
Window Trim
Doors
Door Trim
Hand or Deck Rails
Fl ues
Fl ash i ngs
Chimneys
Trash Enclosures
Greenhouses
0ther
PLANT MATERIALS:
PROPOSED TREES
1, -/- To t'44\'rv €rlsTlN<2
NCPB
Nrx€
B. LANDSCAPING: Name of Designer:
phone:
Botanical Name Common Name Quani ty S ize*
for con'i fers .
(over)
EXISTING TREES TO
BE REMOVED
*Indicate caliper for deciducious trees. Indjcate height
. PLANT IIIATERIALS: Botanical Name Common Name Quanity Size
(con't)
SHRUBS
EXISTiNG SHRUBS
TO BE REMOVED
GROUND COVERS
TYPe Square Footage
SOD
SEED
TYPE OF
IRRIGATION
TYPE OR METHOD OF
EROSION CONTROL
C. oTHER LANDSCAPE FEATURES (retaining walls, fences, swimming pools, etc.) Please specify.
T0:. Design Review Board App'licants for projects jn CCI and CCII
FROM: Department of Conunun'ity Development
Development proposals in CCI and CCII are reviewed by the Design Review Boardwith respect to Design Considerations as outlined in the Urban Design GuidePlan. These Design Considerations address various architectural and landscapefeatures, It is the responsibility of the applicant to demonstrate whethertheir proposal is comp'lying with these consjderations. The Des'ign Considerationsfor the Village and Lionshead are available upon request. Please feel free to
contact Tom Braun or Kristan Pritz with any questions you may have.
Vail Village
l. Roofs
Nof cti^S'l6tt*'
Facades
Ld2 ealttr
Bal coni es
2.
3.
r/Jhlpd0 sAs-t F\r$trro
6.
7.
l. Heights and missing
-l tt
b'7'tt;
2.
J.
4.
Roofs
Fb[€
Facades wal I s/structure
(lccr gnxf/
Facades - Transparency
hFr oftnletix,
4. Decks and Patios
5. Accent Elements
Landscape E'l ements
ND\tr
Service
t{Dk€
L i o nshead
(over )
4#tt- /AaTWDUA{B brD@ 614\
o
Decks and Patios
FId-tB
Accent El ements
\^EcD sAeF .lp f€ FA+{$1lflp 3{'4f, t'il'rP-
Landscape Elements
hropE
Proiect Name:
Project Description:
Contact Person and Phone
Owner, Address and Phone:
Architect, Address and Phone:
Legal Description: Lot Block Filing Zone
Comments:
Design Review Board
Date
Motion by:
Seconded by:
APPROVAL DISAPPROVAL
Dale:
Town Planner E Statt Approval
APPLICATION DATE:
DATE OF DRB I4EETING:
DRB APPLICATION
*****THIS APPLICATION t,lILL NOT BE ACCEPTED UNTIL ALL INFORMATION IS SUBMITTED*****
I. PRE-APPLICATION MEETING:
A pre-application meeting with a planning staff member is strongly suggested to
determine if any additional information is needed. No application will be accepted
unless it is complete (must include all items required by the zoning administrator).It is the applicant's responsibility to make an appointment with the staff to find
out about additional submittal requirements. Please note that a C0MPLETE applica-
tion will streamline the approval process for your project by decreasing the numberof conditions of approval that the DRB may stipulate. ALL conditions of approval must
be resolved before a building permit is issued.
A. PROJECT DESCRIPTION:
B. LOCATION OF PROPOSAL:
naa"ess 5oo Lio^she4 M,.l\
Legal Description Lot
Zon'i ng
Bl ock Filing
C. NAME OF APPLICANT:
llt-r44
$ to,ooo$ 5o,ooo$ 150,000
$.500,000
$1,000,000
$ 1 ,000 ,000
$ 10.00
$ 2s.00
$ s0.00
$100.00
$200.00
$300 .00
IMPORTANT NOTICE REGARDiNG ALL SUBMISSIONS TO THE DRB:
1. In addition to meeting submittal requirements, the applicant must
to indicate property lines and building corners. Trees that will
should also be marked. This work must be completed before the DRB
si te.
stake the site
be removedvisits the
2. The review process for NEW BUILDINGS will normal'ly involve two separate meetings
of the Design Review Board, so plan on at least two meetings for their approval .
3. People who fail to appear before the Design Review Board at their scheduled
meeting and who have not asked for a postponement wjll be required to be
republ i shed.
Address BnX 72q 6 J V* ,t telephone \A-Ud
D. NAME OF APPLICANT'S REPRESENTATIVE:B.r^.e Cr,.^\o* C""{o^ Co.1f . Co'
"d eda (t Address 3.3a1 C\anon',x UAtu telephone Ll'lb'2050
E. NAME OF OWNERS:
F.
S i gnature
Address
DRB FEE: The fee will
VALUATION
$ o-
$ 10,001 -
$,5o,oo1 -
$150,001 -
$500,001 -$ Over
be paid at the time a build'ing permit is requested.
FEE
telephone {
4. The following items no longer have to'be presented to the Design Review Board.
They, however, have to be presented to the Zoning Administratoi for approval:
a. lJindows, skylights and similar exterior changes that do not alter theexisting plane of the building; and
b. Building additions that are not viewed fron any other lot or public space,
which have had letters suhnitted from adioining property owners approving
the addition; and/or approval fron the agent for, or manager of a condominium
association.
5. You may-bg required to conduct Natiral Hazard Studies on your property. you shou'ld
check with a Town Planner before prcceeding.
t
LIST OF MATERIALS
NAilE OF PROJECT:
LEGAL DESCRIPTION:
STREET ADDRESS:
LOT
DESCRIPTION OF PR
Roof
Si di ng
Other l,rlall Materials
Fasci a
Soffi ts
.Windows
"l,lindow Trim
. Doors
Door Trim
Hand or Deck
Fl ues
Rails
Fl ashi ngs
Chi mneys
Trash Enc'l osures
Greenhouses
Other
B. LANDSCAPING: Name
BLOCK FILING
The follow'ing informatjon is required for submittal by the applicant to the Design Review
Board before a final approval can be fiven:
A. BUILDING MATERIALS: TYPE OF MATERIAL COLOR
Sqti^g
of Designer:
Phone:
Botanical NamePLANI MATERIALS:
PROPOSED TREES
EXISTING TREES TO
BE REMOVED
Common Name Quani ty Si ze*
Indicate height for conifers.
(over)
*Indicate caliper for deciducious trees.
o
|SIT.ftTRIALS:
Botanical Name Comnon Name QuanJty Size
SHRUBS
EXISTING SHRUBS
TO BE REMOVED
Tvpe Square Footaoe
GROUND COVERS
s0D
SEED
TYPE OF
IRRIGATION
TYPE OR METHOD OF
EROSION CONTR()L
C. OTHERTiLANDSCAPE FEATURES (retaining walls, fences, swirming pools, "a..) ,r_JilJr.
- Project Application
Date
Project Name:
Proiect Description:
Contact Person and Phone
Owner. Address and Phone:
Architect, Address and Phone:
Legal Description: Lot Block Filing Zone
-
Comments:
Design Review Board
Date
Motion by:
Seconded by:
APPROVAL DISAPPBOVAL
E statt Approval
tuo,,1 tu;uno3 391117
Proiect Name:
Contact Person and Phone
jecl Application
) llia
,u. 7/sof ts
976-otog -6^ozo7
o
Pro
Projsct Descrip lon' Ra- Pnrtit Lio"' ?r.i'..< B'^r tl i "ts
own€r,Addressandphone: Ltaps Przioz- Br+; lli^tl , sal f Lio;rt
H,4l ntl(.
Architect, Address and Phone:
Legal Description: Lot Block Filing Zone
-
Comments:
Design Review Board
Date
Motion by:
Seconded by:
APPROVAL DISAPPROVAL
Summary:
Oate:
Town Planner E statt Approval
lttt oF MATERIALS
NAME OF PROJECT:
LEGAL DESCRIPTION:
STREET ADDRESS:
'p i pe-Eu,- lJt.,
o8--- t.-2t
DESCRIPTION OF
The following information is required for submittal by the applicant to the Design Review
Board before a final approval can be fiven:
A. BUILDING MTERIALS: TYPE OF MATERIAL COLOR
Roof TTt I rt
Si di ng
0ther Wall Materials
Fasci a
Soffi ts
lrJi ndows
l,lindow Trim
Doors
Door Trim
Hand or Deck Rails
Fl ues
Fl ashi ngS
Ch'imneys
Trash Enclosures
Greenhouses
0ther
.tAil t+B. LANDSCAPING: Name of Designer:
phone:
PLANT MATERIALS:
PROPOSED TREES
EXISTING TREES TO
BE REMOVED
Botani'cal Name Cornmon Name Quani ty Si ze*
for conifers.
(over )
*Indicate caljper for deciducious trees.Indicate height
"PLANT IIIATERIALS: lotanical Name Common Name Quanity Size
(con't)
SHRUBS
EXISTING SHRUBS
TO BE REMOVED
TvPe Square Footage
GROUND COVERS
s0D
SEED
TYPE OF
IRRIGATION
TYPE OR METHOD OF
EROSION CONTROL
C. OTHER LANDSCAPE FEATURES (retaining walls, fences, sw'imming pools, etc.) Please specify.
PERMIT NUMBER OF PROJECT
t
INSPECTION REQUEST
TOWN OF VAIL
L ,it / /;': ,o,DATE
READY FOR
LOCATION:
NAME
INSPECTION:
CALLER
1gl,; ruES
t i ,t,,,
WED THUR FRI PM
BU
tr1
trI
EI
n!
KJ
gt
tr
ILDING:PL
o
tr
tr
tr
tr
tr
D
UMBING:
FOOTINGS / STEEL UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATER
FOUNDATION / STEEL
FRAMING
ROOF & SHEER GAS PIPINGPLYWOOD NAILING
NSULATION POOL / H. TUB
SHEETROCK NAIL
tr FINAL C FINAL
ELECTRICAK
tr TEMP. POWER
MECHANICAL:
D HEATING
tr
tr
tr
ROUGH tr
tr
tr
EXHAUST HOODS
CONDUIT SUPPLY AIR
D FINAT tr FINAL
)ROVED
ECTIONS:
tr DISAPPROVED E REINSPECTION REQUIRED
DATE
-,? <.q- i INSPECTOR
INSPECTION REOUEST
VAIL
-1'Lu-,t
WED-.7 ,
. TOWN OF
r\ - N,r f-c ,{( o
=* (-i r r'\ t .
l..LJ, r (,t,{. i
THUR FRr aREADY FOR CTION:
LOCATION:
PERMIT NU,11
,
PROJECT
JOB NAME
BUILQING:
tr FOOTINGS / STEEL
PLUMBING:
D FOUNDATION / STEEL
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATERO FRAMING
- ROOF & SHEEB" PLYWOOD NAILING tr GAS PIPING
tr INSULATION
E SHEETROCK
n
O POOL / H. TUB
NAIL tr
n
#,*o'-tr FINAL
etectRrcal:
tr TEMP. POWER
MEGHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
tr
D SUPPLY AIR
o rfinl tr FINAL
OVED tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
INSPECTOB
il
ciz
E
=G,u,o o
Lr)i
an
r.lJ
r.lJII
=E
IIJ
c;q
ro
c\j(\l
c
tnLo
.p
.t'
CL
o
(l,
P
an
ro
uJ@l: -'\
6N
|.\
.t'
<-;>Yd-
*rx()z*
)
UJF
o
E
F
FIz:o
zz
U)t!
z
ozoI
l
@
c6
=z
ar|Ilz3o
ur
Foz
l!J
UJo
=I
Eot!
lro
.9
3goE
6.C
6oeo
a$6.o
o
o
a,
&F
Ea
o).c
o
(5
o
o)
E
f
co
E
=f,
oo
o
(5
]
.9
E
ooo
sio
o
.9g,'tfs
o
c(0
oc.E
oN
-oc}.o
t-
{)
o
o)
=
o
0)
at
.2
I
'3,lt
g;,}
q,
(u.
an
!'
(ll
o,o
(!
=.
c;.oF.
(!
E't.
o-
o'o
o
cs
oa
Ec(5
.9
(u
;
--
'
CL
Eoo
o
.oo
6
D .,E6'5E
E8
c.9.9o
EEF3o Y'
cL'-oo(E€o'c,
=plg>
c9'- o.Ea
d.E
E.Eotr
FO
CCo':.FY
.Y-
o(5*6
E9'_(B
H('0)ELC
q((!ie.c!
-o.(60
op9'G85EEo6t
tFC'E>E-o q,
!r, o-6E.E'o
-o
cI
tcN
rJ)
t-l (f)s
ts
E
uJ
z
J
5
x()ttl
z
E
9
F(J
tlJJ
uJ
z6
=)o-
J
z
IJJ
=
qJ
IIJt!z
tr
l!
UJ
oE
@;g
UJ
z
6
llJo
6oo-ulo
o-
z
uJ
x
F
ulol
an
IJJ
LUll-
tr
=t
u.,o-
J
Fo
z
J
f
J
F
uJ)
uJ
z
(o
J
9z
I(J
ul
NOrrvnlv^
Eo3zz!-oooltr ^ 6zl; F
=F,j66 a.6 b Eio z X!rL < s.|o q i(H 6 9c.EH 2i'. Y uJ=dNO
(r)
{
*.
=>\a
J
)
U
l
n
au
z
tr
J
lt-
E
uJ
Lr)
LrJ
J
z
=oo
z
F
uJ
J
3llJz
tllltltloFzfzOqE lrJ<oo<
=Hxr!Eo<z
aFz ,.
Oz
-iF
fio
=trOI
I!:J
g,a
uJzYI
F
z
F
J
oz
IL
ar
a
3
F
llt
]
:)
i
JI<li-l
zl
zl
.. >lol!o
uJ
uJzoF
UJ
2
Eo6
<\l
I
Cf).'r{
c\,1(f,
O
uJF
U)oo1zo
Fo-
uJY
IJJo
oFt
=EtuLbla 'rrl= cola) \l
9Nlr;lH u,bEzo
z(,9
=eroo
=zlDJO(L l!
E
=E,tr|o-zIFoDEF(nzo()
=
uJ
II
uJ
2
o
;
F
CEI
CE
o-
JFlU i-h=
IL ITJ
=LO|!9oEulxo-x>
llJ '
j
tr
IIJ
@
F
to
E4o
G
Ett
.E
t
E
Eo(,
trtr!
J,"i5
=E=dd=
Eo=
(U'o
!
tngo
J
(u
(u
c,z.
Iz,
I+,
z,
ui
=z
dlo-)
c,
N
J
t!
z
l(oI sj
llrol(o<!lr\col+r-{l+tixloltt
It-
lHsteIJt<=lEo =tr
Iq
0.1
t4
q
:qoLr|
aul
J
=
ro
cr)
I(o
-
t:
th
!
N
G'J
=c
tr
o
o
UJlr
J
t!
z3oF =e.tr
oa.
olrlI
ll-oz
=oF
ul
UJ Etr
I
I
I
^lilol
uJlEl
JI
<lil
3'tr
.i2
o
uJE
J
t!oz
=F
I
I
I
I
3|rJll
5l
<l>l
FI
Eli!i
Iuz
=o
F
I.JJLT
E
<FEOuJ<ZE!!Ft.l zoo
Jt<oOF;(J
=<'oE\2ilo
l,o
g,
2P
=#1Zrl.o
c)
d5
13;.iFi,z
=g
(lir
=*E Fo2
'()
<Oo?,
-rt 6
-
6
t
EID!
I
EOqF rFH€O(JEE: o.9HCLC+,J O_- ,!
- It' IF E,-. .e Gt
3593t4()c(l,
o 3'i .
H{-E 6Ee-I'E I;5i5 I
="=FE I
=,:
t., t
=.'-E P IJq) .F J839 EJ. q,o!d
=--FEF-s,rt
t|-
UJut:
lf;
It
IE
IE
l.rrGo
acu,
Eoclt tuoz
H6fuJIEz^
72a<
diFE.3
EE-".
; eE
= € -'
:)y(nl; d.r r! c!r !-5 !ii;jlcE!
iEEi>F ganE
Ffie€t
g:s
9-uCICDC
-c€E! o
;g.5
=
.tt CD
:(Jf.:lo
t.aEie!
':EE!,'.':-u
..o 9o9
p&
F.S
"to3';EE
-ECDCc€
Fe66
3oIt oD
;E
)fr@
iero
Ef.
E'o
oq
6
3
.9
€J
€EggEE
F.9 "r#rEE'= e!siC L X.- o -:o|u=-5r !'
=€F:0;l
3 3'rjrE:I
9 E 3^:i Fi
';;F
r= -'t=;9Loa=iE; e
o- c
EEEci|.eo
E5s-.g,r
ae 6'6s:(aP;io= (,' (6cE!
5 rp-!i:-i;Fs!
i:e Eii "-::o"toiBi E
IE;'= q)
gb
-ul
F.C
=E.q 9,
.EgcL
-qtor!5r
-= €r
c9,
:q:
oo:
I (t!.iEE!-..E icc\8;!
35 a
9cEO,E;g=ac o-
3#E3P5
l.-E
-aei6siE9r
,qr! t
)(!CJ
3's:o >:(!^-;
E s-!d or::oc
a,oF@at
EPi
lb'IElst8t\IctetraqIFtrsact;l[ 5rI =.,1, e'iI clt:(
I ol
f, _!EI -Ct ccle;
I .E:
I a,GI A.-i .!E.r=
Eg
*|EE(,,!rE
-gr-'
_ cl.,l
|! O-
o o:pqi
E_ HJ*s:
:.E:Il 0r:9Eootro:sF
f",
o
I
I
I
I
E,o
F
|t'T
rE
U'
UJtJ.
l-
=c
UJ
F
o
ulo
i
qJ
o
=UJ
UJ
z
wut|lz
ul
()
IJJ
G
UJ
zo
=
o-
J
FoF
lo
IFt<
tuJt5l<l
^[
tlvtl
=tirlJI:tl
-
o
=
tr
v,t!
llt(,
7z
bo- 43e
=Fq9(J:>633f,r!>A()>'()FO
at,Fz
z
o
o
o
lls<o-
ll uJ
lE
t^
Il:lt<l
9t
o
:ll
z
J
ll-
/
IF
9z
()
tU
=
gF
3Ed5o
o
C'9
Fo
UJJ
JO<Fcoru<zcc
IJ.I Fozoo
o
UJF
?o
-;
^-'ttd<3->.ttOoo.J
=d
o
$tc-
Is
uJ
=zoo-)
J<o0u)t! uJ
-rO
c
t-
'e)
0)
:.o
)z.
Lo
3/
\l!x
l+^N\t,
'V\
i
\oa
atN
t0
\(\
rl
I:l
:
!
ii
if
I
jr
_{i
sI$il
ri
i$l*-
ilrri(I.lli{lr--st--
rlf ,
f.t\
$l!
tftz,
l,${s
-a
N
/\i\ -/ i
,rt'
!r*:l!
_st-|
-_'iq
tt
4'{
_(tN
_\o
v
\
\ -"--
I
I
.l
I
;
$nt:lfilJ6!t
ctc
iis
st
C'o:
N
X
F
-=
is
ulNtl
fr2g
-rltla
\_-- N
t- | .l
a!r*
-trrs-t.{
=ari
ln
_6'N---4s{
_\o
:l
il
I''.i-lsr iNl-bl
rl
,l
\lq
$\N
\0
\$l
!3
f f .uuarl fi* l''+,ptit,
Project Application
owner, Address dio pr,.in", '-1"
. t ' - ' 'l
-1,
'r+
Architect, Address and Phone:
Filing Zone
-
Design Review Board
'i4
Motion by:
Seconded by:
-,iifiouo. -)
./DISAPPROVAL
Town Planner
N
trfi-araf(fpprovat
2H54G Summer Berge
),
@ A,llta"nL trn. As ,€q*tt/.c frzv,
" c lo 6s -ro E6+ " sfue '/, /*tb^/aoo a
6nt'b labf{= oJ Aw,rtitt<
D'Awnt;n1 ,tt TA,0 ,,(clnnV' 'dRacotl L{Tedr,* (;nAlk nrr,<ek$
-;"Jrlj '>nY%
@ fiyr. oi LttfePJry + 5ia af Prllers
Clogs to Boot ''Ylb*W-%
lerre&s ARe (oo N,,q/,
5ry E E*' touS r
o
75 south tronlag€ road
v.ll, colorado 81657
(303) 476-7000
Steve Sheridan
Box 2568Vail, Colorado, 81658
Dear Steve,
This is a reminder that the second installmentfor the Performance Sports expansion is due atinstallment is $791.39.
Si ncerel y,
t./z- -t,Pfu'.
Jirft t,l. Sayre /
JWS/rme
olflce of clmmunlly devclopmcnt
November 21, 1983
of the parking fee
this time. The
[\ ^,y,Y
-,"
\l'
luwn u
75 3oulh frontage rd.
vall. colorado 81657
(303) 475-7000
lltl
department of community development
April 25, 1983
Dave Haakenson
Clogs to Boots
500 E. LionsHead Circle
Vail, C0 81657
"(_lr-u
Re: Clogs to Boot Sign & Awning
Dear Dave:
0n April 20, 1983 the Des'ign Review Board approved the
C1 ogs to Boot sign and awn'i ng as submitted. The area
inc6rporated by lhe s'ign shou'ld not be larger than three
square feet.
Si ncerely,
tJ
,l; 0tL7/,-- .
Jifi Sayre
Town Planner
JS/bb
/, (l- \
L'u
' t Project Application t
Prcject Name: I /
POect Description:
Contact Person and Phone
Owner, Address and Phone:
Architect, Address and Phone:
Design Review Board
Motion by:fz5-,tn4
Seconded by:A\/ AJ,{ r'
DISAPPROVAL
(:,-, '- O
summary: 4S S'tOmrJ'l 'z>
Town Planner E statt Approval
cl
tr\t
c6
o
CD
o
F
b
o
o
O--.= -. ===l O
Sirv rlbt f Autivl
--T-
tb'
I
-+goT?-r*-
CIDG; Tc
5ioe unu)
Eocl
,
f Awuir,,i
"}*
I,$
I
tt
"F
t Fe- P.l'id
s ter{ APPL lcAl tol{
Do-*e. 4-(- ?S
r(arrrrr or lrojr:cr A@t-1b-\egY _&gA - /hd-t-
tlanrc of Pcr:on sut*,.iuti'n..; :)Aag-,flrqnt€a*p.-.,. ,',,,,n" /Z:fl.-Fp.6#Ea
Location of
Dcscri pti on
proj*ct Lbrcpp ia€ 8U4, - 3aflaz tat €ruo--' ----v_
oF Projr,ct
-&tlrl1
:tAgt _ a^/.;L_
The fol 1o'rring infonriation is required for
to the Design Revic'rr Board before a final
Sign subnittal fee is $20.00.
submittal by
approva'l can
the applicant
be given.
A. Sign
0i
l4ateri a l
' /1 t -l 'B. Description of Sisn C/O4S TO B6CT ,
H;,l_EGR=,,fr huo = 3^u.Zt
D. Comments
I.1ATERIALS SUBI'IITTED h'ITH APPL ICATION
1. Site Plan2. Drawings sncsing cxact location3. Photographs shcr.r'i ng proposed I ocation4. Actual Sign5. Colored; scale-EiawTn-g -6. Photograph of sign
Si en Adnti ni s trator'
Approved for ttRB Subruittal
Di sapproved for Dli0 Sub'rri tta l---
u
rrt)
sb
N
\p-
tr()E
Sign Adrrrini strator'
()
I
v'
tv-
Po.\u(j
75 aoulh lronlage nl;
I.ll, colotldo 816ti7
(303) f78-7000
dep8rtment of community dwelopment
Re: Performance Ski Parking Fee
The purpose of this letter is to assess the parki!9-!ee for the Performance
SH bxpinsion. The parking fee is calculated as follovs
l) Retail stores are required one parking stall for each 300 square feet
of floor area.
2) Your expansion is 300 square feet, so there is one additional stall
rrequi rement
3) In Lionshead there is no "on-site"'parking requirement. A parking fee
ls assessed instead.
4) The parking fee for retail stores is $3'000 per stall -
5) Your total parking fee is $3,000. :
ten percent interest
amgunts, are:
0ctober'8, 1982
Steve Sheridan
Box 2568
Vai'l , Colorado 81558
Dear llr. Sheridan:
Thls $3,000 fee may be paid over
per annun on the unpaid balance.
PAYMENT DATE DUE
0ctober 20;1982
0ctober 20, '1983
0ctober 20, '1984
October 20, '1985
October 20, '1986
a five-year Period with
The payments, in equal
AIOUNT.
$791.3e
791 .9e
791 .39
791 .39
791.39
Srn of Interest: $ 956.95
O
If you do choose'to pay over time, please sfgn the'and return lt to the Tovn.-
Hhen the flrst paynent arrives, you wlll be issu,be issued the
JI]II SAYRE
Planner
ilS:br
Encl .
Performance Ski -2- 1018182o
If you have any questlons concerning the application of
of the Uall llunlcipal Code (see sections 18.52.160 and
hesltate to call.
Slncerely,
secti on
not
$ 39s6.9s
to pay to the order
Municlpal Building
-i
.:
Dollrrs,Three Thousand Nine Hundred Fifty-six and 95/100
with lnterest of ten percent per annum on thd unpaid ba'lancej payable in yearly
instal lnrents as foll ows.:
The flrst lnstallnnnt of $ 79]..!9- due and payable on -99!JQJ-994--'
the second instal'lrBnt of $19!--99- due and payable on-Ogl,lQ.Jl83-'
,
the thlrd installment of $ 791.39 due and payable- on--9410..-Lilg4-'
the fourth insta'tlnent of .i ?9f .!9- due and payable on-!91-,2.9.--U185--'
rltjr the entire unpald balance due and payable on 0ctober 20'' '1985 '
. -;,-tT IS AGiEED thai if this note is not paid wheq-du.e or declared due.hereundel,t':l: iri"'i"iriiipit-ini icc"uia inieriit itre'r'lon shall draw interest at the rate 0r." ld-pErcent'per-innum, ind that riilure to rnke anv pavrnel! 9l-nli:it?l-or interest
rtreh due or'anv-ieiiufi under any incurbrance or agreement securing this note
.*" Shall cause the whole note to become due at bnce, or the interes! to be counted
is iiiriip.f,'it'-tft"-optiJn-ot itre trotaer of the note. The makers and endorsers
anaof.protest, and agree.to any-extensioir of iilne of payment and partial payments
- before, at or after maturity, anA-Ji-ttrii note or intei'eit thereon is-not paid
, il"n'J,ie,ro" ruit is Uroughi, agree to pay all reasonable costs of collection'
-,*.:..lncludlng reasonab'le attorney's fees.
In
of
rt
Vall, Colorf 0ctober 8 19 eZ-
lnstallncnts bfter date, for value received, I promise
theTor,n of Vall'at the0ffice of the Flnance Djrector,
Vall Colorado
lnwn
box 100
Yail, colorado 81657
(3031 476-5613
September 20, L982
Al I en Tafoya
Ruoff-Wentworth Archi tects
500 Lionshead Mall
Vail, Colorado 81657
S'i ncerely,
t/7;- *'
Jim Sayre
Town P'l anner
JS:df
department of community development
RE: DRB Submittal of 9-15-82
Dear Allen:
0n September 15, 1982 the Design Review P9u!"9.ulpTved the..Lion's
iriae'store front revisjons. 5igns and 'light'ing plans should be
sirUriti"i io statt for approval.- A parking fee will have to be
paid at the time of a building perm'it.
t
Project Application
rt:.r1.F;- i;l lvrAj\l (-l'- -:, l< I J-.- if.ri r{f 4: !* .rr:. r J' r-. I t z i-',1" .lH.res
Contact Person and Phone A L c F './ 't-.A r: o v A
q7G 3..:51
Owner, Address and Phone:t DAx
PLtL{::tprAvcf SKI
projecr Name: /L'/':iy'S ?i"/ r.'il- / / Li'' ' . '/' vl ''
Project Description' ii'i-'il:/ ';J'i )' t- i: ii '' r'l l- Ai- 'i- H t.-L ' I ; - -' tilli i-!> A\\'
Architect, Address and Phone:
Legal Description: Lot BlockP4(Ttha,Filing L |rNii{rAr\ lli-,zone ,CIF.
Comments:
Design Review Board
Date
Motion by:
Seconded by:,PAohErt-*
F/N4L-DISAPPROVALL-/^ r)
L/6AT-c-6Er t4Ft^ ,,-€f/)
Summary:
,L itA.LtFt(,4r-t.i
Au)N )NV, .r:qoev) 4i ,/&-jv'an- (oLo.z <
tl
:'
E statt Approval
teration
Jim
wi th
had
was
t orlLhe f irsb floor.
Sayre July 26 wherr t.he appi'icant
the request. tle ex 6-a tnat some of the objectjons
been met--the el evation of the conipl etc bui'l ding was no\^J
now some variaticrn in the facade.
Pic -4- 9/13/82
nci nrod'if icaliorr in 0CIl District for shoc.l [t0(l't1 lcallor| rn LLI I urstr]cl ror Snop
- ----. :- - t;-orr Lire f irsb ilocr. Appl icant: Steve So0r. /ipp t: Steve Sherjdarr
f irst appeared
at that nieeting
presented and there
A1 ien Tafoya, of the Ruoff-l,lentworth Architect,s office, presented the new drawings
and explainecl that Performance Ski was adding only 2BZ square feet. He added
that he felt that enc'l osing the area behind B.1rt and Yeti's with a gate was
an asset, for the gate would hide many jtens and trash that vlere stored there.
Trout objected to the tightness of the Eofner space, and the inability to see
the buildings beyond the court.
Viele moved and liorgan seconded to approve the request as presented in the memo
dated 9/7/82. The vote was 4-l (Trout against) in favor. The motion passed.
Jim Sayre reminded Tafoya of the parking fee that would be assesed the additjon
of square footage at Performance Skj.
5. &egqe$-l9f-q-$$-e-qk varianc-e 'in -qq{qlj9-!91;!Lriglq-"9-Legn!-9.U$-!Lq!-gqtflgEncioaCF lTTeef into-aiequTieTlide setback at Garderr of the Gods ClLtb'
ffifi cE-nT : --fi rs .-X-TEeFI-G .-TjTT- ------
Peter Jamar showed the site plan. Frank Payne of Beck and Associates, contractor
for the applicant, showed draw'ings and phcrtographs of the proposed area' He
explained that there was already an existing deck over the area proposed to
be a greenhouse, but that the greenhouse would extend a little beyond the deck.
He added that the building vras substantia'l 1y below in GRFA, and that the new
addition would have l ittle inrpact on adjoining property owners.
Donovan felt that there was no hardship demonstrated and Viele agreed.
l'lorgan noved and Trout seconded to approve the request for a setback variance
arrd cited the reason that there are excepbions or extraordinary circumstancesor conditions appiicable to the site of the variance'that do not appiy generally
to other properties in the sante zone.
The vote was 3 in favor, 1 against (Donovan) and Corcoran abstained'
Ryan pointed out that other bujldings weren't enjoying the sarne privilege of
building in setbacks. Corcoran felt that perhaps there should be broader
criteria to determine a variance fronr hardship.
Request for anrendment to the munjcipal code to disallovl the revjew of an
--?-.-_.-..---.----.i-_gppt.:S.U.:_on bf_leftgn_nCfiell-qoard_and- Planning and tl-\:Lt.qnl!9'1,tgl Cottttnis_s*ion)pllcatron Dv uestqn Revtew uoard and Plannlnq aud Lnvl ronmenLa I Lonnnrssron*ttr*qpd@lf:_'ril-'I1djEb-,ili' @yc_@ffi'I1djEb-,ili' @yc_@J$l! Appfj"anfr--lirvn orld
Peter Jannr explajned that there had been a nunber of instances where an appl icant
had re-applied for some type of approval with the sane application that had
previous'ly been denied. l'lorgan felt that perhaps one year was too long a titne
franre, that tliey vrere deal ing with riglrts--the pub'l ic had a right to re-apply.
Jauur sa id that the I eqal staff had revicr.red the arnendment,.
Ff
rr' . ; l', rr: -LION'S llDE tsUILDlNG nzuOOf i- a
Leci.r l De:\cr-iption: Lot 3 Block p".t ,.,,f 1 -Filing-Lionshead lst
Descrigri ion of Proiect: Modi store front at Charliers T-Shirts and Performance Ski
to increase visibilitY of shoPs.
The following information is required
Board before a final approval can be
A. BUILDING MATERIALS
Roof
Siding
Other Wall tulaterials
Fa sc ia
Soffits
Windows
Window Trim
Doors
Door Trim
Hand or Deck Rails
Flues
Flashings
Chimneys
Trash Enclosures
Green houses
Other
B. LANDSCAPING
Name of Designer:
Phone:
PLANT MATERIALS
N/A
Botanical Name
TREES N/A
remain natura!.
i).
N/A
for submittal by the applicant to the Design Review
given:
Colbr
ilm up rooT-with redwood decking, redwood to
--[Qtvn co LDR]
N/A
N/A
Custom insutating un it s.
Wood.Clear sealer.
i
Wood /glass.Painted green at Charliers T-Shirts
Wood.
Wood to match ex ist ing.
NiA
Galvanized sheet metal painted to match adiacent materia
N/A
N/A
N/A
Awnings Calabana Burgandy #9915
Awninqs Calabana Green #992 I
Common Name UuantitY 9ize
SHRUBS N/A
CRC!;ND
CO\/ERS
SOD
SEED TYPE N /A
_ *,o I t.rt FoorAGE
SQUARE FOOTACEN/A
SQUARE FOOTAGE
TYPE OF
IRR IGATION
TYPE OR METHOD N/A
OF EROSION
CONTROL
c.
I
Other Landscape
Please -specify.
There will be a
Features ( retaining walls, fences, swimming Pools, etc.)
te installed to estrians from accessinq storaqe area
be wood painted barn red color of Lifthouseat rear of Bart 6 Yetirs. Gate will
:... .. ef l'rolict: LION'S |JlDE BUILDINC REI'!4ODEL
Legal Description: Lot Block-parl__of_l_Filing Lionshead'lst
Description of Project: Modi store front at Charlie's T-Shirts and Performance ski
to increase visibilitY of shoPs.
The following information is required
Board before a final approval can be
A. BUILDING MATER IALS
Roof
Siding
Other Wall lvlaterials
Fa scia
Soffits
Windows
Window T rim
Doors
Door Trim
Hand or Deck Rails
Flues
Flashings
Chimneys
Trash Enclosures
G reenhouses
Other
for submittal by the applicant to the Design Revievr
given:
Tvoe of Material Colbr
AtIT up roof wlth redwood deckin!, redwood to
remain natural.
orrzonta ear sealer IPerlormance >Kl,r wltn clear Sedler t rsl lurlrrclrrr-E .t^rr.
Cedar shingles to match existing (Charlie's T-Shirts).
N/A
N/A
N/A
Custom insulating units.
Wood.C lear sealer .
i
Wood /glass.Painted green at Charliers T-Shirts
Wood.
Wood to match exist ing.
N/A
Galvanized sheet metal painted to match adjacent materia
N/A
N/A
N/A
Awninqs Calabana Creen #9921
N/A
#991s
B. LANDSCAPING
Name of Designer.:
Phone:
PLANT MATERIALS
Botanical Name
N/A
Common Name QuantitY Size
TREES
SHRUBS N/A
( ii ( ui.'tr
CC)/,'ERS
soD
SEED TYPE N /A
SQUARE FOOTACE
SQUARE FOOTACE
*- sou5 FoorAGE
N/A
TYPE OF
IRR IGATION
TYPE OR METHOD N/A
OF EROSION
CONTROL
c.
l
Other LandscaPe
Please -specify.
There will be a
Features ( reta in ing walls, fences, swimming Pools, etc. )
e installed to k trians from accessing sto area
E Yeti's. Gate will be woodat rear of Bart
L.
nted barn red color of Lifthouse
TRANSMITTAL RECORD
TO TOWN OF VAIL /- DATE Sepreusrn z. igsz
75 SOUTH FRONTAGE ROAD JOB NO. 8208
VAIL, COLORADO JOB TITLE LION'S PRi!DE REMQDEL
We Are Sending: Herewith ()0 Under Separate Cover ( )
For Your: Information CX) Use ( ) Action ( )
The Fotlowing: Prints ( ) Letters ( ) SPecs ( ) Cuts ( )
Shop Drawings ( ) Photographs ( ) Photostats ( )
Requisitions,( ) DRB Application (X)
COPIES DESCRIPTION REMARKS
2 Design Review Board Application
RUOFF/WENTWORTH ARCHITECTS AIA P.C.
Copies of Above ( )
Transmittal Only() To:
Allen Tafoya
PLANNING AI{D ENVIRONMENTAL COI'I4ISSION
Septerber .|3, 1982
PRESENT
l{i I I Trout
Diana Donovan
Dan Corcoran
Duane Piper
Jim Viele
I ater:
Jim llorgan
ABSENT
St6Fgdwards
Dan Corcoran, chairman, cal'led the reeting
STAFF- PRESENT
Dick (yan
Peter Patten
Peter Jamar
Jim Sayre
Betsy Rosolack
cogN,crL REP
Ron Todd
to order at 3:00 Pm.
1. Approva'l of minutgs o! rpeting of August 23, 1982.
Donovan moved and Piper seconded to approve the minutes of August
lication for exterior a'l leration and modification
s and add a third f loor conoom]n um at
Vote was 5-0.
in CCi District to enclose
s. AppI icants:
Dan Corcoran explained that five letters had
oh,ners in opposition to the proiect.
Peter Patten gave sone background on t
Jim Qolombo, architect for the project
ponents of the request. He added that
the building conn closer to the height
the app'licant was interested in keeping
Seibert Circle and Hanson Ranch Road.
He showed with transparencies how the
and ualls weFe in p1ace. The windows
could be taken off completely in the
was set back to retain the two storyqt that only I /? of 1 window on th
by Cyrano's proposal , and that the
received from adioining ProPertY
I
made
maki
of
a
's building and reviewed the
board famil iar with various
g ttre Cyrano's building higher
e Gold Peak House. He stated
IIEMO.
COm-
made
that
tiat were already b'locked.
Corcoran read a 'letter'from Rick 'ltermann, lthnaging agent from Arthur
and Company, manager for,:the Mj Creek Court Building,-stating tirat as
the ordinances of the Town bf
Association did not have any
il were adhered to, tne ]lill Creek Court
mrch transparency as possib'le along
0itaing unuld look when the glass roof
nd roof were to mrk e'l ectron'ical1y, and
Cunner. He explained that the third floor
feeling of the building. felorbo pointedteglrnq o? Ene DuIlqlng. Lull'nuu PullrLtr
east side of the Gold Peak House was blocked
are 4 or 5 other windows on the sanp wall
B i shop
long as
Buil ding
ject ion to the Proposa'|.
Jack Curtin, representing himself and Mrs, Coptlandt Hill spoke and mntioned
ili;i dri"'tir,i tnere'wire 2 residences on the second floor wh'ich were changed
io the restaurant and one of the reasons given was that.residences did not
*6r["in'i[il-ip.i., cuilin pointed out th;t Cyrano's.had not finished landscaping'
iii"tf,ut-iirs-iiiti parked oir ttre east side. He added that there las a great- .
oiiisitiitiv irrit 6e'iiiuing watls and roofs would become frozen shut and wou'ld
ffi;i;'sfiu-l iillt"-souilr Oec(. He asked why a model hadn't been required to.
be shown in the proposal. Curtin a'lso maintained that until fte v'lew corrloor
PEC
o "2- 9113182
the Town of Vail, He
view of Vail Mountain
revi"n, wui maae,'thbii shou'ld be no curtailment of pxisting views' He felt
irrii-lt tir aiificutt-to hide the fact that there fas-a 3rd floor, that^the
fuiiaing ii tt was now-ioria be charming if it werf. cleaned up, that a .3rd f'loor '
wo,iia-Ur"oii 4-or 5 wiiiao*l inal iii and-ventilatey' hallways in the Gold Peak _.,.
House. Curtin telt ifrii ift.". *oriA be increase{traffic.because of nnre people
i;-iha riiedr restiuiini ino iooitiona'l peoplg il tl'q condominiumi !:!.:i11ll--_if the condo were rented out. He added ifiii it/.rou1d shade the stream considerably.
iiriin,i-iist iernarti-weri it'ut the applicant sfiould b-e asked to finish what
ttrey trave started before being granted- furtherfpprovals'
Kit Cowpert}unite, representing Jack l'lhitehea
sald thit it was Mr. Whitehead's presence and
L owner of the Red Lion
acts, after Purchasing
tJrat dissolved a law suit between Mrs. Hill a
section 18.24.065 A3 of
felt that it was not being complied with.
Viele felt that more information was neededf P'iper felt that the view corridor
G
iri6uiO oi-p,iisued-tt""", tift-iil piivious-fems th.at-had been approved-should
Ue-i6mpiitba Uetore grinting further ap_proyhls. He felt that l91Y!19-gylllg's
that Mr, Whitehead stood to lose 40-50% of h
addition of a 3rd story. Couperthwaite read
Condcxnin ium,
the condo,
added
with the
the code and
;t t*;";il;iel-iiioweA eiceitent re]ief of/spaces. Piper was concerned that
the deck enclosures Ue iiiietety transpar{nt--90% transparent as r\as presented'
Donovan felt that the alley seemed to be/a calsh'all, that there-uas a definite
i;;;-# iiiit-i6-tt'"-eoio-i,.it House,-_thft there was a moral, obliqatiol olf_h9
part ot Cyianols not i;'iaa itre Sid 1gl"' because of -Pq:t docunnnted act'ion of
frr.-pirts, and that with fogging up, thfre would be little tfnl4ril!y^!9-,tl:-lrlr. Parks, and that with fogg'ing up, tqFre woulo.De llEEle frcrlrsPdrerrLJ LU Llrs
eirirbild-iecrs, ttrat--itre iiii"iEncb'in/tne heights of cyrano's and the Gold Peak
ffi;il;r-inleieiting,. itrii no projec{of Cyraio's to date. had.been compleq.q',-
and that the street 6iclosure witn-tn{ 3rd iloor was overwhelming..-She added that
;"i.;d;; ""itir"ini ireated more deli/eri.es, especially of perishables.
Corcoran agreed with Jack Curtin in
lacking .compared with other appl ica
Columbo pointed out that even
a great difference in height b
there would be more activity gene
that the applicant would agree to
never been a right to Private vi
one were in the Clock Tower area
at the presentation by 'the appl icant was
with/the 3rd story added, that there was sti]l
Cyrano's and the GoId Peak House' that
ted in Seibert Cjrcle and Hanson Ranch Road,
a1l 5 conditions' and added that there had
. He added'that it was-hard to:see-the view unl ess
the windows would not frost
the heat from the inside
irmediately. Col uttbo
He explained thatll" Thermopane, and
said that "a rndel wouldup because they would be of l "
should melt any snow.on the toP
r-
u -3- s/13t82
it should have been brought up when the app'licant
staff did not
enclosed decks
with under
be comple by June I,1983.
st. Corcoran stating that
tailea as others in CCI' and
t been finished, and RYan answered
procedure, that it would not
oi ttre subjects to be discussed
compl icatlons concerning
re was nou an agneement
current criteria
@
be no problem to make, but that
appl ieil for the approval ,
Jim l4organ arrived.
Rvan stated that the request must be dealt
Hi added that the front deck would have to
Corcoran moved and Donovan seconded to deny the re
inai tte.did not feel that this presentation was as
iriit ne did not feel a 3rd floor condo was appropr
;fi"g argument was used that it ailnlt lort ft117zna-iioorl "I think those 2 areas alore-are str
."it.iii. the items 'listed by Curtinl' The vote
deny with Morgan abstaining.
view corridor reviewCurtin asked why thettnt the I egal staff
stand up legally.
at the joint meeting
was not confident with
He added that this was
on Tuesday, SePterber
uest for variances for GRFA and s cks in order to construct an addition
0n I of, .v.,rn Terrace.
Patten exp'lainedtjnt the request
the front deck to
that the request has b
now was for only the ai
revised
lock on the
the south.
since the last meeting' in
west side and to exPand
,Jim I'hnning, representing the applic
concerning snow removal and storage.
ts, shdwed site plans. Discussion followed
the variance request for the setback
the front deck. The vote was 3-3
Donovan, Corcoran and Piper vot'ing
ilorgan moved and Viele seconded to approve
for the airlock as
with Morgan, Viele
we]l as the se ck for
and Trqut in i vor, and
against. The motion did not pas
Donovan moved and Piper secon
only as per the staff recomen
vras reminded that he had l0 s in which to appeal the decision to Town Council.
to approve the variance request for the a'irlock
tion. 'The vote was 6-0 in favor. The appl icant
I
-
Piper and Patten left at thi point,
-4- 9/'13182
o
4.st for exter
Sayre revibwed the'
the request. He expla
been met--the elevation of
now some variation in the
-ilteration and mod
against (D
buil dings
van )
ication in CCII Distrlct for
ilorgan moved and Trout seconded
and cited the reason that thereoi conditions applicable to theto other prop€rties ih the same
ppl icant:
26 when the appl icant first appeared
that some of the obiections at that meeting
the complete building was now presented and there
facade.
to approve
are except s or extraordinarysite of
zone.
variance-that do not
and Corcoran abstained.
enjoying the same privilege of
perhaps there should be broader
ridan
,J im
wi th
had
was
Allen Tafoya, of the Ruoff-l,Jentworth Architects officeo presented the new drawings
and explained that Performance Ski was adding only 282 square feet. He added
that he felt that enclosing the area behind Eart and Yeti's vrith a gate was
an asset, for the gate would hide many items and trash that were stored there.,
Trout objected to the tightness of the corner space, and the inability to see
tlte bui'ldings beyond the court.
Viele moved and Morgan seconded to approve the request as presented in the memo
Mted 9/7/82. The.vote was 4-1 (Trout against) in favor. The rption passed.
Jim Sayre reminded Tafoya of the parking fee.that would be assesed the addition
of square footage at Perfoyrnnce Ski.
t for a setback variance in order to construct reenhouse that would
can
Peter Janar showed the site plan. Frank Payne of and Associates, contractor
the proposed area. Hefor the applicant, showed drawings and photographs
explained that there was already an existing deck o the area proposed to
a little beyond the deck.be a greenhouse, but that the greenhouse would ex
He added that the building was substantia'l'ly belo in GRFA, and that the new
addition would have 'litt]e impact on adjoining rty owners.
Donovan felt that there was no hardship rated and Viele agreed.
request for a setback variance
ci rcumstances
appiy general ly
'tsetbacks. Corcoran i
determine a variance f
uest for amendrrrent to the ode to disallow the review of an
and tnv
year.
Peter Jamar explained that there had n a nunber of instances where an appl icant
had re-appl ied for sore type of app val with the same appl ication that had
previously been denied. Morgan fe 6 that perhaps one year was too long a time
rights--the publ ic had a right to re-apply.
d reviewed the amendment.
The vote was
Ryan pointed
building'incriterla to
3 in favor, I
out that other
I t that
hardshi
frame, that they were dealing wi
Jamar said that the legal staff
apprrcatl0n ts suDs milar t0 one revrewed w
'f i!t''li-Tr4 ' 'F"
PEc -51Dtt3/82
Trout had the same reaction the Morgan had concerning the time element and suggested
perhaps 2 oy 3 months. Jamar pointed out that this amendment did not prevent
appldcants from appealing. Ryan added that this amendment llas the resl'lt ofdirection from Council. l'lorgan felt that it was overkill. Viele felt that there
were getting to be too many regulations. Donovan generally was in favor of the
amendment, She pointed out that the Covered Bridge building was another example
when the applicant asked to table his request until the nexi, meeting nften one'of the absent board members would be there. Corcoran added that another exanple
was the pool bubble for the Lodge at Vail. viele answered that that was the '
right of the appl icant.
ilorgan-moved and Viele seconded not to recomrcnd the zoning amendment to Town '
Councl'l . The vote was 3-2 (Corcoran and Donovan against) in favor of not
recornBnding the amendment to the Town Council.
6, Request for arendments
Tor-oI[il66F1fi5'lEirE to the municipal code'to revis submittal I ations
roor veno'tnq.own ot Ya
Peter Jamar explained that the Arterial Business Distrthat it may be at a later date. He added that the crb
needed in the amendment because vending stands were
anplained that this
approval , It becomes
amendment would cut the tirE
t was not included, but
sed out items were not
al1owed, kiosks were
it would take to
about the time element.
a location question,
owner's approval ,
covered-i1 th9 sign ordinance, and accEssory outdoor/dining terraces were coveredby-conditional uses. Awning ind windbreaks were a sed in the Urban DesignGuide.Plans; Th9 Question fus raised as to penaltfs imposed upon zoning-ioieviolations, and Ron Todd referred to Section'19.66/025.
c Ryan
get
and
and
a staff situation. v ele asked
Jamar rep'l ied that there was not time invo ved, ratherthe permit uns issued to the lessee with'property
The discussion which
have a new ordinance,(it was decided that
could merely include
most buildings havethis information in
novement surveys), whether the Town
usiness I icenses.
fol'lowed concerned whe r or not it was a good idea to
whether it was costl to ask for an improvemnt survey,
.laraf suggested that perhaps the regulapp'lication for a business license or
ions
icense
could be included as a part of.an
renewal .
Ryan suggested tabl ing this item for further study.
Viele moved and Trcut seconded to
vote was 4-0 in favor (Morgan had
'le the request until Septenber 27, Theeft).
ok at theCorcoran asked the menbers to l
speed up the meetings and nnke
remo Dick had written on ways to
suggestions at the next rEeting.
discuss this.
dditiona'l
He suggested meeting a lalf r earl v to
Corcoran fe'lt that atten
the nreeting was over was al
was important at each meeting and staying until
important.
Ryan reminded the rerbers of the joint flEeting on Tuesday, septenber 2l andBetsy asked which menbers could go to ttre Nl.JcdOG meeting-on Oct l5 & 16.
The meeting was adjourned at 6:00.
PLANNING AND ENVIRONMENTAL COMMISSION
Septerber '1 3, 1982
2:00 pm Site visits
3:00 pm Public llearing
'1. Apprcva'l of
2. Appl ication
encl ose two
Appl icants:
o<pansion
Appl icant:
minutes of meeting of Augus! 23.
for exterior alteration and modi cation
decks and add a third floor c
Bud and Greta Parks
omin i um
in CCI District toat Cyranors building.
construct an addition
0dum
disallow the review of
and Environmental Cosnission
reviewed within the
3. Request for variances for GRFA and se bks in order to
on lot 9, Bighorn Terrace. Appl icants John and Debbie
4. Request for an arEndment to the muni
an appl ication by Design Review Boaif the application is substantial1!
ipa'l code to
and Planning
similar to one
Vailprevious year. Appl icant: Town
5. Request for F alteration'a ification
Lion's Pride Court the first
Sheridan
lequest.for arcndments to the municipal cade to revise.sub,mittal:regutationsfor outdoor display and outdoor vend\ng.r/Applicant: Town of Vail -
Request^ for setback variance in orae/o construct a greenhouse that would
encroach l0 feet into a required sile setback at Gard6n of the Gods club.Applicant: Mrs. Albert C..Hi11 /
in CCII Bistriict for shop
fI oor.
5.
7,
Published in the Vail Trail SepterDer 10, 1982
T0: Planning and Environrnenta'l Coornission
Ff,OM: Department of Conmunity Development
DATE: Septenber 7,1982
SUBJECT: App'lication for exterior alterations for the Lion's Pride
building in Cornprcial Core II. Applicant: Steve Sheridan
DESCRIPTION OF PROPOSED PROJECT
This application has been revised since the Planning Conmission meeting of
',luly 26, 1982. Performance Ski is moving out approxinately 16 feet. Charlie's
T-Shirts is putting in a bay window, Vail Mountaineering is pr':oposing no changes
to their facade. Perfomnnce Ski is enclosing approximately 300 square feet.
I. COMPLIANCE I,'ITH TI.IE PURPOSE SECTION OF COMI{ERCIAL CORE II
This section reads:
The conmercial corc II district is intended to provide sites for a mixtureof rultlple dwell ings, Iodges and cornercia'l estab'lishments in a clustered,unlfied development. cormercial core II district in accordance with theVail Lionshead urban design guide plan and design considerations is intendedto ensuye adequate I ight, air, open space and other amenities appropriateto lhe permitted types of building. and uses and to raintain the'desirablequal,ities of the district by establishing appropriate site developnent stan-dards.
This application generally meets the purposes of the Cflmercial Core IIdlstrict.
II.SUB-AREA CONCEPTS
The Lion's Pride court is mentioned in the sub-area concepts:
Gourt opened to free access to Lionshead Court. Planting area
reduced, relocated to abut Lionshead Arcade Building to [rovidescreen buffer for restaurant and force traffic fluw-out bf
shadors into sunny area of court. Scuplture focal point.
rhe tey phrase here refers to the flow of pedestrian traffic ln relationto shadows. The current store fronts are hiaaen away under the second floorbalcony--the store windows are often veiled by shadoils. The remodeling would
take the store f,ronts at least part way out oi the shadows. The Vail [ionsheadUrban Design Guide Plan does ca]l for such first floor rsnovation and expiniionto permit greater visibil ity for connercial activity,
Lion;s Pride -2- 9/7/82
III. UREAN OESIGN CONSIDERATIONS
1. Architectural Style
The Design Considerations state that the "challenge in Lionshead is to
develop vita1ity, visual interest and pedestrian scale within a contem-
porary architectural expression. "
The project generally meets this controlling criterion. The design does
not pretend to b a foreign architectural style, it creates visua'l interest
with the awnings and materials, and is oriented. to the pedestrian.
2. The second design consideration encourages "a series of connected plazas..
occasionally linked by a mal'l..."
The application does not disrupt.this pattern.
3. The Guidelines also encourage "a sense of pedestrian sca'|e...'l
The Lion's Pride remodel will improve the pedestrian scale of Lion's
Pride Court by brining the store fr.onts out from under the balcony
and improving the visibility of the store fronts,
The fourth criteria states that the service/delivery and parking corridorsin Lionshead should be preserved.
The application does not alter these items.
This appl ication does increase the visabil ity of cormercial activity
in Lionshead.
IV. DESIGN CONSIDERATIONS
4.
5.
The facades have been changed in the curr€nt plan in order to cone lnto closer
confortmnce to the Lionshead Urtan Design Guide Plan and to address some
of the concerns of the Planning Cormission. The Guide Plan calls for recessed
entmnces--Performance Ski exhibits such an entrance. The Planning Cormission
rns also concerned with maintaining the character of indlvidual store fronts.
This concern has been addressed by addlng a large bay windor to Charlie's
T-shirts.
One other concern was voiced by the Planning Comrnission: that the expansion
of Performance Ski would enclose a positive space--the distance between the
Lion's Pride bui'lding and the Lifthouse. trhis enclosure has not changed
in the current app'lication. This change will screen the rather unkept
alley between the lifthouse and the parking lot to the rear of Lion's Pride.
The remainder of the Lionshead Guide Plan, under the title, "Architectural
Guldelines," wiLl be addressed by the Design Review Board. These items include
he'lght and rassing, roofs, facades, decks and patios, and accent elements.
tion-s tr$ -3- e/7182
v. 7rf{nilG c0f{sr0ERATIoNs
Pry the applicable parking fee for the conrnerclal expansion,
vr. SIAFF RECq!F|EN0ATrgN
The Department of Cornrunily Developrnnt ieconmends appr^oval of the proiect.
Ite rcrrcdel will improve Lion's Pride court by making the shops npre visible
and accessible to pedestrians and will irprove the asbiance of the court' by addlng accent elements.
\
o
PLANN ING AND ENVIRONMENTAL COMMISS
.July 26, l9B2
o
ION
/L(a+'''
y ordinance because
ring in 1978 and the
that the Inn at West Vail
e 28 was passed. He showed
and explained that there
ts to be converted had never
ee housing could change the
to condominiumize. Jay Peterson,
were still 79 accom.modation
condo map was two years old,
P, .'.u
PRESENT
l,li'll Irout
Diana Donovan
Dan Corcoran
Jim Viele
Duane Piper
.Jim l'lorgan
ABSENT
Sffi-Edwards
STAFF PRESENT
Peter Patten
Dick Ryan
Jim Sayre
Peter Jamar
Larry Eskwith
. Betsy Rosolack
COUNCIL REP
BTfTTItTo
the chairman, Dan Corcoran at 3:'10 pm.The
l.
nEeting was called to order by
Approva'l of minutes of meetjnq of July '12, 1982.
Viele seconded to approve the minutes. The vote was
of room) t
the Inn at !,Iest
ve ropmen
Donovan moved andfavor. (Trout out
was the first proposal to come through since 0rdina
a plan of the 19 apartments on the 4ih and 5th flog
as a condition of approval. He added that the
been long-termed.
l'lorgan wondered if sonp other lodge with emplo
employee housing to nitely rental and then asf
representing the applicant explained thatunits in the lodge. Corcoran stated that
that the intention to condominiumize was o
'tn5-0
2.uest for a roval of conversion of 19 a a rtmen ts
rry ura
Peter Patten explaineci that 0rdinance 28 was an emerg
Apollo Park had converted employee apartments to time
ordinance was quickly drafted afterward. Patten sai
were also two accommodation units on the 4th leve that would remain as such
county. Donovan expressed concern that th/s
the two year old map made for
wou'ld be precedent setting.
and
the
Eskwi th
stated that the ordinance now being consi
take place.
red would state where conversions could
to appro the condominium conversion at theTrout moved
Inn at West
of approva'l
abstai ning.
and Vie'le seconded
Vail per the staff
The vote was 4-l
memo da
in favor
td 7/21/82 including the two conditions
with Morgan voting against, and Corcoran
Q, -r- ,,r,u,r,
3. Request for approval for conversion to time-sharing for Ipanema Condominiums
Appl icant: Daymer Corporation
Peter Patten reviewed the time sharing regulations a pted by the TOV in l9B0 and
F zone district could thereexplained that, the regulat'ions stated that only 'in
be time sharing. He explained that at Ipanema the
which meant that an actual deed passed hands, and
would contain five weeks. He listed the amenit'ie
would be interval ownershipt each time share sales packeage
available at Ipanema and explained
Patten also mentioned that occupancythat there had been a rea'listic budget proposed.
rates recently surveyed in Vail averaged 54%'for,
ownership. Jay Peterson, representing the appl
up for intensive use and that it also had ma recreational amenities intended
/hotels as opposed to 86% for interval.
cant, statea'tnat Ipanema was set
time share would spread out the use
season. He explained that in interval
for the luxury condomin'iums. He felt that the
and bring more people into the town in the o
ownership, each owner would be paying for expenses of the whole building.
Corcoran read a letter from the Villa Corti
the opposing statements saying that the I
with the Fire Protection District, and wa never on lanri owned by the Town, that
there had never been a height variance g nted, and that this request was not a
rn with the method of marketing that is
often used in time sharing and wanted to control the marketing with a condition
of approval and also wanted a condition hdded that Ipanema could not lease any
llowing this up zoning when up zoning wasn't
variance request. Donovan expressed co
a opposing the conversion, then answered
ema 'land was the result of an exchange
atten answered that this was not considered
nor additional units were being added, and
ch time-sharing was allowed, and in this case
ion of the existing units.
more parking spaces. Viele questioned
a]lowed on the lot next door (Byrne).
Viele'fe'lt that there was inconsis
had voted against Projects in
cy in wanting more intensive use
thebecause he fe'lt that the conrnission
more intense use was involved.
were a'l ready in place, but theyit just seemed inconsistent. Pi
increased use would mean increas
each request would be considered
seemed we] 'l suited to time-sh
activity. Patten reminded the members that
up zoning because neither greater GRF
that further, this was the zone in wh
trould nnke for more effective uti'li
Discussion fol I oved concerning ether
terson explained that in this case the facilities
d be more fu1ly utilized. Viele stated thatfelt that Viele's position was well taken because
or not use could be zoned, and EskvJith assured
that one of the conditions should be that
spaces cou'ld be leased out.
in this building
past because
since there was nothinq but blafor a balcony on the top floor.
6n a case by case basis, and that this request
rinq. and that no neighbors would be affected'
waii facing the neigtbors to the west excepting
tiem that it cou'ld. Donovan
none of the 5 remaining surfa
Morgan moved and Trout sat Ipanema per the staff
after consideration of the
conditions--that the market
remaining parking spaces
the conditional use to allow time-sharing
including conditions numbered I thru I
2 of the memo and with two additional
peated
parking
to approve
dated 7/20/82
ctors on page
Donovan moved and Viele s
stated in the staff memo
abstaining.
ng program be approved by the staff and none of the
leased out. The vote was 5-0 in favor, Corcoran abstaining.
nded to approve the request for a minor subdivision as
vote was 5-0 in favor with Corcoranted 7/20/82. The
Jim Sayre reviewed the memo. explaining the sub-area concepts involved. Alan Tafoya,representing Ruoff Wentworth, the architects on the projeit, showed plans and elevaitions. Corcoran reminded the members that the actuai ficadi would bb consideredand discussed by the Design Review Board. Trout, neverthe'l ess, statedthat he felt the design was poor. Donovan point6d out that in this case there wasa.fine line between the decision of the PEC"and the DRB. She felt that the eievationsshould have been presented showing the second floor, is the appearance of both floorstogether would influence her decision. Tafoya felt that a peibstrian mall was createdDonovan disagreed, and felt the effect was a negative one. 'Coiiorjn agieeO-witnuonovan ln that there was a closing off of the mal 1 space. Viele asked about theoverall design plan for Lionshead ano was to'ld that a'bond election was in ihe worfs
T9r.tlp next spring to complete the inprover;rents in Lionshead. Jamar pointed outthat there were not p'lans for that buiiding, but that Study Area #5 would go into
:Ifg.!:.meaning that this building would eV6ntually be tor-n aown. fiiovi iiuilathat this was to be an interim measure. Viele queitioned the life of t-he buildingand hesitated to approve a-stop gap measure. tdtoya answered that it would 'depeid
on when Bob Lazier could afford [o'implement Study Area #5.
Tafoya stated that the shop owners were willing to spend the money to improve theirstores. Piper felt-that it was important not Io look at the chanles as ttrougn tneywere interim only, for many so-calied interim measures in Vail weie still stindinq.morgan felt that the parking fee should be paid by the landlord, and Corcoran repTiedthat that was something thai could be settled between the landlord and the tenants.
P9!9Y9n was opposed to the yequest, because it totally closed oif tne op"ningJ-Uetw""nDulldrngs. Iirovg replied that as one approaches the building, one's altention'ls orawn t0 the shapes. one sees the concrete wa] l, cars, and trash.
Piper^moved. and Morgan seconded to approve the request as per the staff memo dated7/20/BZ with the condition.that the birplicant will'not iem6nstrate against a specialdevelopment district if and when one i! tormea for Vail Lionshead. The vote was2 in favor, and 4 against. The motion failed.
Trtut moved and Morgan seconded to approve in concept the request for presentationEo tne Deslgn. Revrew uoard and then 'indrcate to the Design Review Board severalconcerns of the PEC.
corcoran replied that it was not in the realm of the pEC to suggest specific
!::jg!-,.t,.L99s;,P?tlgn.agreed and pointed out that the pEC hao-Io act on tne specrficpnoposal' and that if.there were any significant changes, the applicant had to re-apply' and that also the appl'icant iou]i ask io nave ine'requei!'tableo. wiiio'agreed with Patten.
o -3- 7t26/82
4.st for exterior alteration and
th'e
modification in CCII District in order to
vee first floor shops in on's Pr u r to rnq. ADD I rcanE :
The vote was l-5 to_jlenyjbgjglggl with Trout in favor.
t Li".^r,?riak
c, -4- 7/26/82
5. Request for exterior alteration and modification in CCI District in order to
s
Peter Jamar went over the memo with the commission, and added that although the
applicant wasn't do'ing anything encouraged in the Urban Design Guide Plan, they
were also not doing anything against it.
'The use of the room on the west side was discussed, and Story explained that
and Vie]e stated that
further enclosingHill Street, since it was already small and narrow.rcoran stated that he was
Plaza Lodge Building had come
one overall p'lan. Story
agreed, but added that the lessee would contineuntil the owner finds it economically feasible
propose changes indefinitely
comply.
it wsuld ho'ld a table for'lunches for the employees.
they saw no problem with the proposal . Donovan objec
always opposed to enclosing decks. He added thatin 6 or 7 t,imes with sma'l 1 changes, and wished to
Brad Henry, manager of Chri sty Sports, stated
Corcoran replied that the addition further cl
Plaza Lodge building had stressed in previo
Dusy street. Story replied that the UrbanT
canyon-1ike effect coul<t contribute to th/ganyon-like effect coul<t contribute to ttc was not necessarily negative.
tlt'm Sayre explained the request
Drager, representing the applica
Ray
per
TO
hat he was not creating an
ed down the space on Hillunti'l it would become unattractive to walk u. He added that the owner
applications that this was a very
sign Gu'ide Plan points out that the
obstacl e.
Street
of the
Prper moved and Trout seconded to app the appl ication per the staff memo dated
7/20/82. The vote was 4 to 2 with
passed.
ran and Donovan against. The measure
6. R uest for condltional use tin to construct a wi nterorder
me enc osure over roperti es
streetscape in certairi areas and that
ald the two sets of conditional use criteria. Ed
stated that originally the applicant had planned
6ee the application be resubrnitted with the ctranges.
the staff had studied the app'lication from the stand-ly extend half way over the pool in reviewing rhe
ny of the menrbers felt the same way, and after muchnt, Drager asked to have the appiication tabled until
to use a bubble they already c
Now they wanted to change thei app'iication to have a bubble over all of the pool
d in ltaly, then found that that was not feasible.
questioned whether applicant was asking to arnend the application. SayreEskwi th
stated
Patten
that he would like to
agreed and added thatpoint that the bubble wou'id
views from public spaces.
more
the
discussion of this po
August 9; .|982 meetinq
Morgan moved, Trout
The vote was 6-0 in
s
T a
ed to table t'ill August 9 at the applicant's request.of tabl ing.
PEc - 7/26/82
Eequest.for ime_ndments.to the municipal code Section .|7.40.075 Condominium
Conversion--Lodqe and Accommodation Units to clarify wordinq and to reflect
7.
rmi t es |n Ene
on
aT
units out en tac
n
on District to make clear that
ti es w
cant:own 0t va
r input. Jay Peterson felt that
s the PA district. Vie'le felt the
ordinance was an over reaction, and Es ith pointed out that it brought about
Eskwith described the changes, and asked
CCI and CCII should be treated the same a
because of statutary request. Patte
need for a comprehensive revision, E
Trout moved and Morgan
the August 9 meeting.
The meeting was adjourned at 6i55 pm.
seconded table the amendment recommendation until
The votgrwas 6-0 in favor of tabling.
explained that the staff felt the
kwith mentioned that he wanted to make
more changes and get more input and hsked to table the item until August 9.
o
l:30 pm Site Inspections: Ipanema, Christy's, Lion's Pride
3:00 pm
1. Approval .of minutes of neeting of Ju'ly 12, 1982.
Z. Request for approva'l of conversion of 19 apartrnents at the Inn at t'lest Vail.
App'licant: Jbines Barry Craddock, d/b/a Craddock Development Company
PLANNING AND ENVIRONMENTAL COMMISSION
July 26, 1982
modification in
n the Lions Pride
3. Request for approva'l for conversion to time-slq for Ipanema Condominiums.
Applicant: Daymer Corporation
4. Request for exterior alteration
to expand the first floor shoPs
Steve Sheridan
5. Request for exterior alteration and I District in order to
renrodel the second floor office space
Building. App'licant: Christy Sports
CCII Dis
Building.
ct in order
Appl icant:
for Christy Sports in the Plaza Lodge
6.
7.
Request for conditional use permit in order to construct a temporary winter
tjnie enclosure over one-half'of the Lodge at Vai'l swimming pool .
Applicant: Lodge Properties, Inc.
Request for amendments to the munic'ipa'l code section 17.40.075
Coridom'injum Conversion--Lodge and Aci:ommodation Units to clari.fy wording and
to reflect the original int6nt of the ordinance. Also an amedment to section
18.22.020 Permittei Uses in the Public Acconrnodation District to make it clear
that only units without kitchen facilities (i.e. accommodation units) will be
a'llowed in the PA Distrjct. Applicant: Town of Vail
Pub'lished in the Vail Trail Ju'ly 23, 1982
I'IEM0RANDUM
T0: Planning and Environnental Cormission
FR0l'l: Cormunity Developrnnt Department
DATE: July 20, 1982
SUBJECT: Application for exterior modifications for the Lion's Pride Bu'ilding
ih'Comrercial Core II. Applicant: Steve Sheridan
DESCRIPTION OF PROPOSED PROJECT:
The project is to remode'l the facades of the ground level retail stores in the
Lionr'is Fride Building. Three stores, Perfonnance Ski, Char'lie's T-Shirts, and
Vail ilountaineering,-are increasing their enclosed floor space by mov'ing their
store facades out i few feet towards Lion's Pride Court. Charlie's T-Shirts
anA Vait Mountaineering are moving their store fronts out about six feet, and
Performance Ski is moving out approximately l8 feet.
I. SUBAREA CONCEPTS
The Lion's Pride court is mentioned in the sub-area concepts:
Court opened to free access to Lionshead Court. Planting area
reduced, relocated to about Lionshead Arcade Building to
provide screen buffer for restaurant and force traffic flow out
bf shadows into sunny area of court. Sculpture focal point.
The key phrase here refers to the flow of pedestrian traffic in relation to
shadows. The current store fronts are hidden away under the second floor ba1 cony--
the store windows are often veiled by shadows. The remodeling would take the
stbre fronts at least part way out of the shadows.
II. URBAN' DESIGN CONSIDERATIONS
l. Architectural Sty'le
The Design Considerations state that the "challenge in Lionshead is to deve'lop
vitality, visual interest and pedestrian scale within a contemporary archi-
tectural expression. "
The project generally meets this control'ling criterion. The design does
not.pretend to be a foreign architectural sty'le, it creats visua'l interest
with the awnings and materials, and is oriented to the pedestrian.
2. The second design consideration encourages "a series of connected plazas...
occasionally linked by a mall...,,
The application does not disrupt ttris pattern.
o
Lion's Pride -2-
of the project.
shops rore
ambiance of
The remainder of the Lionshead Guide P'lan, under the tit'le, "ArchitecturalGuide'lines," wi]l be addressed by the Design Review Board. These items includelnight and mass'ing, roofs, facades, decks and patios, and accent elements.
3. The Guidellnes also encourage 'fa sense of pedestrian scale...,,
The Lion's Pride remodel wi'l'l improve the pedestrian sca'le of Lion's Pride
Court,by. bringing the store fronts out from under the balcony and improvingthe visibility of the store fronts.
4. The fourth criteria states that the service/de'livery and parking corridorsin Lionshead should be preserved.
The application does not alter these items.
ZOII II'IG CONS I DERAT IONS
The vail Lionshead urban-Design Guide plan does call for such first floorrcnovations as outl ined in this project.
The 'leaseholders in the first floor stores.will be required to pay a parkingfee. This fee shat't be paid before a buitding pe*ii'ii iisuea. TheTorm council is in the piocess of reviewing ifie'iilunt'or'irre parrringfee for the cofinercial fores.
The Department of Corrnunity Development recommends approvalThe.remodel. wilr improve Lion's Fiioe court bv mariirl ttrevlsrDre and accessible to pedestrians and will-improvE thethe court by adding accent'elenpnti.- -'
Date
Ueelication
May 2i, :r
APPLICATION FORM FOR
EXTERIOR ALTERATTONS OR MODIFICATIONS IN COMMERCIAL CORE II (CCII)
VAIL LIONSHEAD
The application will not be accepted until all information is submitted.
1. NAME OF APPL]CANT Steve Sheridan
This procedure required for alteration of an existing building which adds or removesany enclosed floor area or or{ldoor patio or replacemlnt of an- existing building shallbe subject to review by the Planning and Environmental commission.
ADDRESS
2. NAME OF
ADDRESS
APPLICANT'S
500 Lionshead
Box 2558 Vail, Colorado 81 657 PHONE 476-5348
REPRESENTATIVE Ruoff/Wentworth Architects, AIA
Mall, Vail, CO 81657 PHONE 476-30sr
3. AUTHORIZATION OF PROPERTY OWNER
SIGNATURE Robert T. Lazier
ADDRESS_ Tivoli L@ge Vaif, Colorado 81G57
LOCATION OF PROPOSAL
ADDRESS 500 Lionshead Mall
PHONE 475-5348
4.
LEGAL DESCRIPTION Part of
Lions Pride Buildinq, lst Floor Shop Fronts
3, Vail/Lionshead lst Filinq
t,
fu*
^0'l"
Block I, Lot
c/o Vilcor, 610 West Lionshead Circle,
Box 627, Vail, CO 81558; Lifthouse - 2,.' t,Lodge, 555 East Lionshead circle, vait, co 81652; Vantage point, 580 East I - c.t(/a*
ttVt.LI-wvt-1 t.# -;qt S r=. . ,, ,./11. DRAWtNcS: Ftoo'r plin, soutir"Etevaiio;:"-S.Liionr.
'ii,cLc
I'a',',
SHEAD URBANIII. RAT]ONALE FOR THE PROJECT AND COMPLIANCE WITH THE
DESIGN GUIDE PLAN:
The application is submitted as an interim improvement to the Vail Lionshead Urban
Design Guide Plan, Sub-Area Concept, East Mall Entry item 5, i.e.
5. FEE: Check for 9100.80 enclosed.
6. IMPROVEMENT SURVEY: See attached improvement survey by Richards Engineers,Inc., dated June 15, 1975.
7. A list of the names gf _owners: Vail 21,
Vait, CO 81657; Uo6{&ffercade, p.O.
v n-Ll
O^rl
--t /^ / p,
iti / i';VAIL LION
"Additional study area to explore potential to
intensify Lion's Pride Court . . . "
expand and
and item 7
". . . and force traffic flow out of shadows into sunny areas of
Court . "
The existing shop fronts along Lionrs Pride Court are presently tucked underthe second floor balcony creating a visibility problem for the store fronts;
Performance Ski being more severly impacted by being even further back away
from the pedestrian flow through the Court.
The building modification presented here will intensify Lion's Pride Court by
creating a stronger pedestrian focus at the Courtyard level with enlarged dis-
play windows, colorful awnings, and a unified building front. The added
square footage will increase the merchandizing capabilities of the three shops
which will add to the intensification of Lionts Pride Court.
IV. VAIL LIONSHEAD DESIGN CONSIDERATIONS:
A. HEIGHT AND MASSING:
The upgrading of the shop fronts will not alter the height of the existingbuilding. The movement of the existing shop fronts toward Lion's Pride Court,
with the addition of the awnings, will create a pedestrian focus to help divert
attention from upper building heights at the Lifthouse and Vail 21 Building.
B. ROOFS:
The existing balcony along the second floor of the buitding will serve as the
roof for Vail Mountaineering and Charliets T-Shirts. A new flat, built-up roof
will be constructed over the extension of Performance Ski.
C. FACADES-WALLS/STRUCTURE :
The new wall will be finished with a similar horizontal wood siding for all threeshops. The siding will be stained a medium range cotor compatible with the
existing building.
D. FACADES-TRANSPARENCY:
The transparency of the shop fronts will be increased by approximately IOE bythe additional glass area created by the 45o entry recesses and enlarged display
windows.
E. DECKS AND PATIOS:
NA
F. ACCENT ELEMENTS:
Canvas awings will be used over the shop windows to create color and visual
interest within the Courtyard.
G. LANDSCAPE ELEMENTS:
Existing landscape elements will not be altered.
ZONING CHECK:
Zone: Commerical Core 2
Lionshead Study Area #5 (See lmprovement Survey
Requirements for establishment
Development Plan
Permitted and Conditional Uses
Use - Basement
Use - First Floor
Use - Second Floor
Use - Above Second Floor
Conditional Uses
Accessary Uses
Lot Area and Site Dimensions
Setbacks
Height
Density Control
Coverage
Landscaping € Site Development
Parking and Loading
Location of Business Activity
Legal Description)
NA
Same as CCI District Sections
18.24.020 through 18. 24. 050
Retail Shops
Retail Shops
Professional E Business Office:
NA
NA
NA
Site Area - 45,426 sq. ft.
North - No Change
East - No Change
South - l',
West - No Change
No Change
NA
Allowed : 31, 798 sq. ft.
Existing : 4, 368 sq , ft.
Proposed: 4,818 sq. ft.
No Change
No Change
NA
for
ofr8.26.020
r 8. 26. 030
18. 24. 020
18.24. 030
18. 24. 040
18.24. 050
18.26.040
18. 26. 050
18. 26. 060
18.26.070
r8.26.090
r 8. 26. 100
r8.26. r20
18.26.140
18.26.'t50
18. 26. 160
EXISTING CONDITIONS:
See photographs of existing shop fronts.
vt.
o a
Dat.U Application Jllay 21, 1982
EXrER I oR ALTERAT r oNS #f^HS#li?T'f,ttt'
^ioJo""r*., AL co RE | | (cc I r )VAIL LIONSHEAD
l. This procedure requlred for alteration of an existing building which adds or removesany enclosed floor area or outdoor patio or replacemLnt of an existing building shallbe subject to review by the Planning and Environmental commission.
The application will not be accepted until all information is submitted.
l. NAME OF APPLICANT Steve Sheridan
ADDRESS
2. NAME OF
ADDRESS
P.O. Box 2568
APPLICANT'S
500 Lionshead
vait Colorado 81657 PHONE 476-5348
REPRESENTATIVE Ruoff/Wentworth Architects, AIA
Mall, Vail, CO 81657 PHONE 476-3051
3.AUTHORIZATION OF PROPERTY OWNER
SICNATURE Robert T. Lazier
ADDRESS Tivoli Lodqe Vait Colorado 81657 PHONE 475-5348
4. LOCATION OF PROPOSAL
ADDRESS 500 Lionlhead Mall (Lions Pride Building, lst Floor Shorr Fronts)
LECAL DESCRIPTION Part of Block 1, Lot 3, Vail/Lionshead lst Fili
5. FEE: Check for 5l 00.80 enclosed.
6. IMPROVEMENT SURVEY: See attached improvement surveyInc., dated June 16, 1975.
by Richards Engineers,
7, A list of the names of owners: Vail 21, c./o Vilcor, 610 West Lionshead Circle,Vail, CO 81657; Lionshead Arcade, P.O. Box 627, Vail, CO 81G58; LifthouseLodge, 555 East Lionshead Circle; Vail, CO 81657; Vantage point, 590 East
Lionshead Circle, Vail, CO 81657.
ll. DRAWINGS: Floor Plan, South Elevation, Sections.
III. RATIONALE FOR THE PROJECT AND COMPLIANCE WITH THE VAIL LIONSHEAD URBAN
DESIGN GUIDE PLAN:
The application is submitted as an interim improvement to the Vail Lionshead Urban
Design Cuide Plan, Sub-Area Concept, East Mall Entry item 5, i.e.
J,t
'Additional study area to explore potential to . . . expand and
intensify Lionrs Pride Court . . . "
and item 7
". . . and force traffic flow out of shadows into sunny areas of
Court. "
The existing shop fronts along Lion's Pride Court are presently tucked under
the second floor balcony creating a visibility problem for the store fronts;
Performance Ski being more severly impacted by being even further back away
from the pedestrian flow through the Court.
The building modification presented here will intensify Lionts Pride Court by
creating a stronger pedestrian focus at the Courtyard level with enlarged dis-
play windows, colorful awnings, and a unified building front. The added
square footage will increase the merchandizing capabilities of the three shops
which will add to the intensification of Lion's Pride Court.
IV. VAIL LIONSHEAD DESIGN CONSIDERATIONS:
A. HEICHT AND MASSING:
The upgrading of the shop fronts will not alter the height of the existingbuilding. The movement of the existing shop fronts toward Lionts Pride Court,
with the addition of the awnings, will create a pedestrian focus to help divert
attention from upper building heights at the Lifthouse and Vail 2l Building.
B. ROOFS:
The existing balcony along the second floor of the building will serve as the
roof for Vail Mountaineering and Charlie's T-Shirts. A new flat, built-up roof
will be constructed over the extension of Performance Ski.
C. FACADES-WALLS/STRUCTURE :
The new wall will be finished with a similar horizontal wood siding for all threeshops. The siding will be stained a medium range color compatible with the
existing building.
D. FACADES-TRANSPARENCY:
The transparency of the shop fronts will be increased by approximately I0B by
the additional glass area created by the 45o entry recesses and enlarged display
windows.
E. DECKS AND PATIOS:
NA
F. ACCENT ELEMENTS:
Canvas awings will be used over the shop windows to create color and visual
interest within the Courtyard.
G. LANDSCAPE ELEMENTS:
Existing landscape elements will not be altered.
V. ZON]NG CHECK :
Zone: Commerical Core 2
Lionshead study Area #5 (see lmprovement survey for Legal Description)
18.26.020 Requirements for establishment of NA
Development Plan
18.26.030 Permitted and Conditional Uses Same as CCI District Sections
18.24. 020 through 18. 24. 050
18.24.020 Use - Basement Retail Shops
18.24.030 Use - First Floor Retail Shops
18.24.01t0 Use - Second Floor Professional E Business Office
18.24.050 Use - Above Second Floor NA
18. 26. 040 Conditional Uses NA
18.26.050 Accessary Uses NA
18.26.060 Lot Area and site Dimensions site Area - q5,426 sq. ft.
18.26.070 Setbacks North - No Change
East - No Change
South - 11'
West - No Change
18.25.090 Height No Change
18.26. 100 Density Control NA
18.26. 120 Coverage Allowed: 31,798 sq. ft.Existing: 4, 368 sq . ft.
Proposed: 4,818 sq. ft.
18.26.140 Landscaping ig Site Development No Change
18.26. 150 Parking and Loading No Change
18.26. 160 Location of Business Activity NA
VI. EXISTING CONDITIONS:
See photographs of existing shop fronts.
DatU Application May 21, l9B2
APPLICATION FORM FOR
EXTERIOR ALTERATIONS OR MODIFICATIONS IN COMMERCTAL CORE II (CCII)
VAIL LIONSHEAD
l. This procedure required for alteration of an existing building which adds or removesany enclosed floor area or outdoor patio or replacement of an existing building shallbe subject to review by the Planning and Environmental commission.
The application will not be accepted until all information is submitted.
l. NAME OF APPLICANT Steve Sheridan
ADDRESS P.O. Box 2568 Vail, Colorado 81657 PHONE 476-s348
NAME OF APPLICANT'S
ADDRESS 500 Lionshead
REPRESENTATIVE Ruoff/Wentworth Architects, AIA
Mall, Vail, CO 81657 PHONE 476-30s1
AUTHORIZATION OF PROPERTY OWNER
SICNATURE Robert T. Lazier
2.
3.
ADDRESS Tivoli Lodge Vail, Colorado 81557 PHONE 476-s348
4. LOCATION OF PROPOSAL
ADDRESS 500 Lionshead Mall (Lions Pride Building, lst Ftoor Shop Fronts)
LEGAL DESCRTPTION Part of Block 1, Lot 3, Vail/Lionshead tst Filin
5. FEE: Check for 9100.80 enclosed.
6. IMPROVEMENT SURVEY: See attached improvement survey by Richards Engineers,Inc., dated June 16, 1975.
7. A list of the names of owners: Vail 21 , cJo Vilcor, 610 West Lionshead Circle,Vail, CO 81657; Lionshead Arcade, P.O. Box 627, Vail, CO 81658; Lifthouse
Lodge, 555 East Lionshead Circle, Vail, CO 81657; Vantage point, 580 East
Lionshead Circle; Vail, CO 81657.
ll. DRA!{INGS: Floor Plan, South Elevation, Sections.
III. RATIONALE FOR THE PROJECT AND COMPLIANCE WITH THE VAIL LIONSHEAD URBAN
DESIGN GUIDE PLAN:
The application is submitted as an interim improvement to the Vail Lionshead Urban
Design Guide Plan, Sub-Area Concept, East Mall Entry item 5, i.e.
"Additional study area to explore potential to
intensify Lion's Pride Court ' .
"'
and item 7
expand and
". . . and force traffic flow out of shadows into sunny areas of
Court. "
The existing shop fronts along Lion's Pride Court are presently tucked under
the second ?bor'balcony creating a visibility problem for the store fronts,;
Performance Ski being more severly impacted by being even further back away
from the pedestrian flow through the Court.
The building modification presented here will intensify Lion's Pride Court by
creating a stronger pedestrian focus at the Courtyard level with enlarged dis-
play windows, colorful awnings, and a unified building front. - The added
square footage will increase {he merchandizing capabilities of the three shops
which will add to the intensification of Lionrs Pride Court.
IV. VAtL LTONSHEAD DESIGN CONSIDERATIONS:
A. HEIGHT AND MASSING:
The upgrading of the shop fronts will not alter the height of the existing
building. The movement of the existing shop fronts toward Lionrs Pride Court,
with the addition of the awnings, will create a pedestrian focus to help divert
attention from upper building heights at the Lifthouse and Vail 21 Building.
B. ROOFS:
The existing balcony atong the second floor of the building will serve. as the
roof for Vaii Mountiineering and Charlie's T-Shirts. A new flat, built-up roof
will be constructed over the extension of Performance Ski .
C. FACADES-WALLS/STRUCTURE:
The new wall will be finished with a similar horizontal wood siding for all three
shops, The siding will be stained a medium range color compatible with the
existing building.
D. FACADES-TRANSPARENCY:
The transparency of the shop fronts wilt be increased by approximately lOE by
the additional gliss area created by the 45o entry recesses and enlarged display
windows.
E. DECKS AND PATIOS:
NA
F. ACCENT ELEMENTS:
Canvas awings will be used over the shop windows to create color and visual
interest within the Courtyard.
G. LANDSCAPE ELEMENTSI
Existing landscape elements will not be altered.
V. ZONING CHECK :
Zone: Commerical Core 2
Lionshead study Area #5 {see lmprovement survey for Legal Description)
18.25.020 Requirements for establishment of NA
Development Plan
18.26.030 Permitted and Conditional Uses Same as CCI District Sections
18. 24. 020 through 18. 24. 050
18.24.020 Use - Basement Retail Shops
18.24.030 Use - First Floor Retail Shops
18.24.040 Use - Second Floor Professional E Business Officel
18.24.050 Use - Above Second Floor NA
18.26.040 Conditional Uses NA
18.26.050 Accessary Uses NA
18.26.060 Lot Area and Site Dimensions Site Area - 45,426 sq. ft.
18.26.070 Setbacks North - No Change
East - No Change
South - 11.
West - No Change
18.26.090 Height No Change
18.26. 100 Density Control NA
18.26.120 Coverage Allowed: 31,79g sq. ft.Existing: 4,368 sq. ft.
Proposed: 4,818 sq. ft.
18.26.140 Landscaping E Site Development No Change
18.26. 150 Parking and Loading No Change
18.26. 160 Location of Business Activity NA
VI. EXISTING CONDITIONS:
See photographs of existing shop fronts.
to
GAGETIA'FASSOCIAIES
R-ANtf\C At{O LAIWAFE AffiITECIIRE
MEMO
GAGE DAVIS ASSOCIATES. INC.
91O TWENTY EIG HTH STREET
BOULDER, COLORADO AO3O3
(3031 449-1 166
"'l &/,4rt-, tL
.@,n
AraU lb kL y'h-'- ts'f7 *bw<-fwfru^t"^u-f/i
6at'tttll'ta /nh d/4 l" 1tp'^a';+ h tr-
-,rftrlfru** it Fttlt tu:ru|t/"i^ 6ry
Urd'Lt l"l4iat p--XlrtJl tt{l' 5 ilt au5'}4 : /
lU\
tn('h,/t l<- a/t-;r Wz ar LM-'
4riltu
Date
lApplication
MaY 21, le82_
APPLICATION FORM FOR
EXTERIOR ALTERATIONS OR MODIFICAT]ONS tN COMMERCIAL CORE ll (ccll)
VAIL LIONSHEAD
l. This procedure required for alteration of an existing building which ad_ds-.o.r removes
iny-"h"lo..d floor'u.." o1. outdoor patio or replacement.of an existing building shall
be'subject to review by the Planning and Environmental Commission.
The application wilt not be accepted until all information is submitted'
1. NAME OF APPLICANT Steve Sheridan
ADDRESS
NAME OF
ADDRESS
P.O.Box 2568 Vail, Colorado 81657 PHONE 476-s348
Mall, Vail, CO 81657 PHONE 476-30s1
3.AUTHORIZATION OF PROPERTY OWNER
2.APPLICANTIS
500 Lionshead
R E PR E SE NT AT I V E R uoff /W entworth 4 t"el'rjitecl:1-4-!4
SIGNATURE Robert T. Lazier
ADDRESS Tivoli Lodge Vail, Colorado 81657
4.LOCATION OF PROPOSAL
PHONE 476-5348
ADDRESS 500 Lionshead Mall Lions Pride Buildinq, lst Floor S
Fili
ll.
il1.
LEGAL DESCRIPTION Part of Block 1- Lot 3. Vail/Lionshead lst
5. FEE: Check for 91 00.80 enclosed-
6. IMPROVEMENT SURVEY: See attached improvement survey by Richards Engineers',
lnc., dated June |6, 1975-
7. A list of the names of owners: vail 21 , cJo Vilcor, 610 west Lionshead circle'
Vail, Co 81657; Lionshead Arcade, P.o. Box 627, Yai|, Co 81658; Lifthouse
l-"Jie. 555 Easi Lionshead Circle; Vail, CO 81657; Vantage Point' 580 East
Lionshead Circle, Vail, CO 81657'
DRAWINGS: Floor Ptan, South Elevation, Sections'
RATIONALE FOR THE PROJECT AND COMPLIANCE WITH THE VAIL LIONSHEAD URBAN
DESIGN GUIDE PLAN:
to the Vail Lionshead Urban
item 5, i. e.The application is submitted as an interim improvement
Oesig;i 'Guide Plan, Sub-Area Concept, East Mall Entry
tv.
"Additional study area to explore potential to
intensify Lionts Pride Court . . . "
and item 7
expand and
". . . and force traffic flow out of shadows into sunny areas of
Court. t'
The existing shop fronts along Lionrs Pride Court are presently tucked under
the second floor balcony creating a visibility problem for the store fronts;
Performance Ski being more severly impacted by being even further back away
from the pedestrian flow through the Court.
The building modification presented here will intensify Lionrs Pride Court by
creating a stronger pedestrian focus at the Courtyard level with enlarged dis-
play windows, colorful awnings, and a unified building front. The added
square footage will increase the merchandizing capabilities of the three shops
which will add to the intensification of Lionrs Pride Court.
VAIL LIONSHEAD DESIGN CONSIDERATIONS:
A. HEIGHT AND MASSING:
The upgrading of the shop fronts will not alter the height of the existing
building. The movement of the existing shop fronts toward Lionrs Pride Court,
with the addition of the awnings, will create a pedestrian focus to help divert
attention from upper building heights at the Lifthouse and Vail 2l Building.
B. ROOFS:
The existing balcony along the second floor of the building will serve as the
roof for Vail Mountaineering and Charlie's T-Shirts. A new flat,built-up roof
will be constructed over the extension of Performance Ski"
C. FACADES-WALLS/STRUCTURE:
The new wall will be finished with a
shops. The siding will be stained a
existing building.
D. FACADES_TRANSPARENCY:
A.14f ^//z/'- ?
The transparency of the
the additional glass area
windows.
E. DECKS AND PATIOS:
NA
F. ACCENT ELEMENTS:
Canvas awings
interest within
will
the
similar horizontal wood siding for all three
medium range color compatible with the
shop fronts will be increased by approximately 108 by
created by the 45o entry recesses and enlarged display
be used over the shop windows to create color and visual
Courtyard.
G. LANDSCAPE ELEMENTS:
Existing landscape elements will not be altered.
V. ZONING CHECK:
Zone: Commerical Core 2
Lionshead Study Area #5 (See lmprovement Survey for Legal Description)
18.26.020 Requirements for establishment of NA
Development Plan
18.26.030 Permitted and Conditional Uses Same as CCI District Sections
18.24. 020 through 18. 24. 050
18.24.020 Use - Basement Retail Shops
18.24.030 Use - First Floor Retail Shops
18.24.040 Use - Second Floor Professional 6 Business Officer
18.24.050 Use - Above Second Floor NA
18.25.040 Conditional Uses NA
18.26.050 Accessary Uses NA
18.26.060 Lot Area and Site Dimensions Site Area - 45,426 sq. ft.
18.26.070 Setbacks North - No Change
East - No Change
South - lL
West - No Change
18.26.090 Height No Change
18.26.100 Density Control NA
18.25.120 Coverage Allowed: 31,798 sq. ft.
Existing: 4,368 sq. ft.
Proposed: 4,818 sq. ft.
18.26. 140 Landscaping 'E Site Development No Change
18.26. 150 Parking and Loading No Change
t 8.26. 160 Location of Business Activity NA
VI. EXISTING CONDITIONS:
See photographs of existing shop fronts.
W
75 Sortb Frontage Road
Vtil, Colorado 81657
t 0r -47 9 -2I t I / 47 9-21 t 9
Department of Commxnity Deoclopmcnt
April 9, 1993
James W. Avery
Avery & Howe P.C.
Attorneys & Counselors at Law
1800 Mile High Center
1700 Broadway, Suite 1800
Denver, Colorado 80290-1 801
Re: ChinoiserieAntiqueShop-Wooden
Lions Pride Building
500 E Lionshead Circle
Vail, Colorado
Building Ofticial
Pritz
Chrono
Platform
Dear Mr. Avery,
Per your request dated March 18, 1993, we have researched our files in order to locate
approvat regarding the above referenced project. we have not found a buiEing permit for a
wooden platform addition.
lf we can be of further assistance, please don't hesitate to call or write.
xc:
$$,
Bdwi! A. Itrowo, II
famer Williem Avery'
Suc*t A. Frank
.*.s lLra Q frr Y* l^r
AWRY & HOWE, P.C.
A Protedorul hrporwion
Anorncts tk &unsclon At Law
It00 MrII llrcH CBNrBr.
1700 BRO DWAY, st rrB 1800. DBNVn,CO|,n.Am
csreo'1801
March 18, 1993
Tdcltc 3{8431-9Bl
Frc.ililG: !Gt32-69f
Building Oegartment
75 S. Fronage Road
Vail, Colorado 81558
Attn: Kristin Pritz w
Chinoiserie Antique Shop
Lions Pride Building
500 E. Lionshead Circle
Vail, CO 81657
Dear Kristin:
Per our conversation this aftemoon, please forward our office a copy of the building
permit for construction of the wooden pladorm in front of the entrance to the Chinoiserie
Antique Shop in the abovementioned building. Ttris elevated platform is part of the walkrray
adjacrnt to the building, and is illustrated in the enclosed reproduction. Please advise us of any
costs incufied for photocopies, etc. Thank you.
If you have any questions regarding this matter, please feel free to contact this office.
Cindy Furst, Secrctary to
Iames W. Avery
Re:
o
.-
_l
cY) |@lcDlol-l
o2
E
=c,lrjo-
ooo
ooo
U'
UJ
uJll-
F
=e.
LlJc
s$\Ns\\al
9r
.ltl
gl
IH
lo
I
I
I
zlt-{ |
frl&
FI
El**16-ttr
is
rEri
uJF
EoF
E
FI
=:
z
=.
oul
Foz(,
=oJ
f.0
€
o
z_z
uJ
oz
l!Julo
=
crolt
ci
Eo.c
g
Il6.9'
ct
C\oc
'oF
al
ooooc
to
.sIt
o
IDt'
o
ttc6
ottoo
cD
.Ep
5o
E
o
=cf
cD
.Ep
5o
E
o
=cf
Eo
o
ctct6
'.9
E
-t- 0, c
E * E.sl
aEf:
EEHE
€ gE:E
E;:E
FE! p
c96FIoSo
!EEF
EE
gr
E!eec\ 6 c!--SEre
EE='g
E:EE
-o.uor-C?d o.- !.c;oo
gEEE
;A;qeEg:
- (, (!::
.$.{t .it{
4
E
EE
UJo-
z
J
-o
UJ
C)z
J
J
I
e,t-()
u,)ul
oz
=JA
I2
C)
UJ
=
UJu,tlzo
F
u.lEo
uJe
o
oo
'llJ
UJ
G,zIat
UJo
F
o
u,
o.l
2
urJ
x
F
nJ
at,f
(t
ut
uJt!t
=G
uJA
J
FoF
<,z
6J
@
J
o
GFoqJ
ut
oz
co:
-
z
[JE
d
ts
H
NOrJ.Vn'lVA
o\
5l
dl
3l
u,l
o
-Eo;
oz9
o-
E
8
uJo
J
uJz
llJ(,
->G
-tiD
=l!ai
=6(\l
=z99F-V'5"4
U'Ozt-89g<oqH6E8jri
>.l
Flrq
EI(t)
v)
&FIHFlt
wC)
Hut
l.s
l*t(-)t<lFl
lO.
l14l&
zI
f
l!
tti
o.
o
urL
F
r(
'<F-o-
UJE
=9
E
29
E
UJ
;
uJ2
at
=z
zOoKUo<9d
=Hxu:oo<z
E<t2?
'.F
EO}E
UJ
J
(
ooutzY
i
z
F
2
oo
3
at)
o
F
o
t-o
_rl<l
FI
=_l
zl
.. >l
ltloululzotr
ul
J
z
Eoo
z
o9z_eoo
=z=:de
EBi
;Hg
lrJ
ts(D
loo?zo
.L
LlJ
:a
UJgl
oFt
=E
UJo
lto
o-oo
I
utFoz
E
=Ellt
o.
lr-
EqE3€EIPa95EE ;tF FEE 3tE oo9 EutE XO-E ;-E14
€=
H
F
-,-.
l.:re
| (:/v!a
\Xzl/ fl
I
-
a
E
=E
lrJ
o-z9F(J
f
oc
Fa
zoo
D!tr
(Jz)tr
I
I
I
J
J
ao
FoJ
H
=z
loo,-t
&
t-tN
trlo
UJ
=2
ln(\l(n
Xo
Fq
A
o
U1
UJe
o
\o
o\
I\o
i
H
E
E
ttUI
uJEo
I
=
Io.
F6
Ig
oz
olll
cr
-ta
ltoz3oF
oH
Hq)
rrl|lfrl
F
rr1z
=tr
II
frl
I@6
oz
d
|lJG
J
t!oz3
F
\o.ir
Ior.iro\
u
u
F
=ctt
g
ciz
dlu(E
J
a
ttoz3oF
t
tr
ctz
d
uJG
J
lroz3
F
uJJ
IIJ
F
g,
IIJz
=o
F()
llJ
F
t
d
-lO<FoaouJ<zEul l-tr6
J
IE
F
ul
-Jt-)r
t
?
z
)
2p
e3]Fd6()
-tIz
r()
tJ.J
=
t
?
t
z
sb
=
\JZ
<oHN=l!Fn
o
Ig;ta
ls5f:gI c.g",gS
F=sis*
f 5triA
$ : ti;5
I :€is;
i :5 s'i F\lfEolirleqsfS\
-!iE-: E 'F";;!=giSsE {
iE r;s '
eP 5 30nt;= c ot
E E =:!- A.l1 t-r I
:;c)(/rEg:: cEEi5;5i!::stEFsgcr9 6* p
>*oiF
!Fr;s-6;',sE
I
I
I
l_
t<to
I
I
I
a
I
,ot<
ltt
t=lo
l(,lz
t9
th
|r,
UJ\
LlJ
z
Bo
llt
ozEo
aiu,Foz
oz.
oJfo
.O
ozzo
xX
zxI
;
C)
o
Iv,:z
z;
()(J
u,
=2...
o-*z=
3Eo:
ir=
ll"llI -tlll-
lr -,
1;:lro
lrslIt<l
llt^t
l-lr
tc tl
r<tllc tlisrlli:ll
l<ll
II
II
Itllrr tl.-- tl
l!
E
-:rlSrl.1
=Ol\,
e=5;-a':!
=Ei9(Jsg.3f*ta>(,FOJ.{
.. >lo
rlJou,allz
tt,
=uI
UJ
l2
an
B
'--lg
I
It-tolo
I
J
FoF
o
q.
u
=
t..,
z
u.,
J
ozI
(J
x
(J
z
o-
(Jz
E)NOtlYn.lv
ol
fl
5
g
oll-l
\f\
\t
-(
z
J
tl
I
I
_fJlc
I
I
I
5
J<()(Jv,uJ u-'JO
UJ
z
-r
z
q
uJl
JI
<lilol
3l
rl
z
0
UJ
:l
slttlol
3l
trjll
JlluJllFti
=6:1 F
=?ic<
Ho--o
gF
FO
=s;J=
()
oF
C)
Lu
UJ
lll
lr o ll JOts ilE6I = ll u.r <Ig ilu=fflU
z,.o
2z
:JOri t!
nnr-'l
J..i5YY;
;=<
BEEatl
=><aErgrDa
=E=s:{e-
=i^. Sg:g
i r.,J O
==F-r-aE-.., I
=:J >
E=E
=I3 ='3 ll;si tl
E=; HI: - o s-le;E -l!<=- r'l tr
- ttt
-oIo
I
lel
:=e
F
E
tJ.l1n
=2o
F-(Jf
Cnzo
CJ
a'-
lltl
&
r-xta-
r!
+.'f :..'|'
75 soulh tronlage road
vail, colorado 81657
(3o3) 479-2L.38 ot 479-2L39
TO:
FROM:
DATE:
SUBJECT:
olflce of communlty development
ALL CONTRACTORS CURRENTLYL REGISTERED WITH THE
TOWN OF VAIL
TOWN OF VAIL PUBLIC WORKS/COMMUNITY DEVELOPMENT
MARCH 16, 1988
CONSTRUCTION PARKING & MATERTAL STORAGE
rn summary, ordinance No. 6 states that it is unlawful for anvperson to l-itter, track or deposit any soil, rock, sand, clebrisor material , including trash durnpsters, poriable t,oiLets andworkrnen vehicles upon any street, sidervalk, alley or public
p1?9e or any portion thereof. The right-of-way on aI1 Town ofvair streets and.roads is approxinateiy 5 ft" 3ff p..rnnenc.This ordinance will be striltty enforeld by the Tor.rn of vailPy!}ig works Departnent. persons found vi-otating this ordillancewill be given a 24 hour written notice to remove-said nrateriar.-rn the event the person so notified does not coinpty with thenotice within the 24 hour time specified, the pul:_ic WorksDepartment wilr remove said mateiial at the expense of personnotified- The provisions of this ordinance snirt not beapplicable to construction, rnaintenance or repair projects ofany street or alley or any utilities in the right-a-way.
To review ordinance No. 6 in furl, prease stop by the Town ofVail Building Departrnent to obtain a copy. trranr you for yourcooperation on this nat-ter.
Read and acknowledged by:
Position/Relationship to nroject 1i.e. contractor, owner)
Date
PERMIT NUMBER OF PROJECT
oora ':l ,ri1r,,/ ,l'/ JoB NAME
tNs
I
PE CTION REQUEST..I\ TOWN OF VAIL
, A_ /,,L_'
I
| ,','11-, ':
INSPECTION:
CALLER
MON ,5UeS WED THUR FRI AMREADY FOR
LOCATION:
BUILDING:PLUITIBING:
tr UNDERGBOUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr
tr
tr
tr
tr
tr
tr
FOOTINGS / STEEL
FOUNOATION / STEEL
FRAMING
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION
SHEETROCK
tr POOL/ H. TUB
NAIL tr
tr
trtr FINAL FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
O ROUGH tr EXHAUST HOODS
tr CONDUIT O SUPPLY AIR
axat ,slitLf/rtcsn ,,'|'b/.x' s tr F.NAL
XI APPROVED
' conREcrtoNs,
T] DISAPPROVED tr REINSPECTION REQUIBED
DATE INSPECTOR
ffisre
,/)
4
(..'A
'2,z+
r1,)('4-7iv
uJF
U'tro?zo
F
TLulY
lrJgl
z(,9zeoo
=z
o-- P
=f;:
=Hg
oF
EF.-
HE
t!loJ
o. >lo=l_,_)lrlgur
2E
tr
tr
UJGlt
EE2ZE<qf,€8E9!LD9'EE
=>=u:-E b=o dEE =1E U59 EutE XO-E ;-Eul
€=
uJdl
oF
,@
F
=Eltlo-z9F
C)
-l
E,
6zoo
!!n
oz
F
=E
uJo-
Lnlt/L
3H 3t:fl= €r5'' ;* - Irll1
-l =l
Et 3lsEt
=:5=l.ll-ElJ l;i :z I i/,
BiE Hi=Ir ;5ro tzti ,7
-i- o c lr+
6 tr E.q ld
gEE€il
ilE
EiNE
;Fleil.iF
:;i:UsigE;FE\ llEEg";geE \s?sE; ei\ l\€t-'Pt v \ftig;
!EEtg
iiiii
=>E
-I|r)ItnN
=o(\l
{E
3H
zc
3ZztLo ootr ^ 62q 5 >eE g oE
ooEee fil!<o* +dq frE6 ;FrN(J
uJ)J
IE
z
F
J
oz
9
=F
ul
t!ib
o
z.Y
o-
z
o
6
z
E
2
tri
uJ
cE
J
?
l!
z;
F
I
I
I
I
I
?lol!.tl
1l
?l>lttlol
Pl Pr
F.,fl
=oCJ
L!JJ
J
z
dgJ
E
J
l!oz3oF
ol
zl
aFI
ol
gl
5
(,
=J
t/)
J
(J
LrJ
CLtt1
F
o
cct
lJJ-vlzo
J
ii
=z
coo-t
(t't
F\
I
r.c|
i
Eo
=o
=J
r.b
=+e.Oz
E
-.lo<FGOuJ<zEL! F(rr Z-o
o
Ftt<tr-
b<t b<t t_J
/.\ cuJo.. uJ oF -.t .r-
ECOp
=<.6d(-) ELlH (O
O-Jr-
(5 0- xz,< a)
JIL A
F.< F{ tt)l!v c
d r=Os(oLt l-
tJ1 p
O.du@o o+)
lJ-l ! (U
t! E-7-O2.L'tstn .oHE()oc5 !.rtsz.V o-
=Lt,o c,pJ9 (u
JFUIQ@lJ- J (\l
tJJ
-.r
l,
F.
f.
x
oo$
x x x
\.
1..f*
U'
IJJul]LF
=t
IJJL
tl
tp
fi
r$
iqlollzll€tl
lt
t!o
=
II
o
o
.EFzoo
aco
(r
luz3odIr|JarZ.-3HofuJ
<F
ozo<
{
d
d,,|
\l\l\il
t
N
-X
6 i 8.9)
B EE:E
€freEI
E.= E F 3
I,E:;: OE EE
iiEg;
irEiE
e=Esg$E; ei
fE is5
iEEts(u o'-.: -c= o o tr
gs;=i
E 3A;E
gBiEI
3l
5
'1,vtul
.-)n
8l
l/
J
nlAI
c
tr
=E
u.lo-oz
6
ao
x
C)llJ
oz
o
oau
uJ
oz
=Jc
LU
IIJltz
tr
uJ
u.J
@
3
_t!
{lJ
z
6u,
t-6oo-u,oq
z
lll
C)
x
F
u,o
t$
t.t,.tl
F
trluiLl
oF
z
o
EFogJ
UJ
z
Jo-
oz
o
UJ
=
J
FoF
! (\J
NO|lVn'lVA
uJF
o
-
Ye.o
=ZZtL<oooi
F^ltzq 5 = 9-iE P OE,
ooEZ !- ()-{8 3 fr;rL<9 q d.rH 6 trbto=iq fii ol O*.
t
>G
-Io
=uJcv
=.oN
ll
XJ
.l
J
1
I
+
:
I
s
.ra!
)
z
tr
J
{
UJo-
F
uJ
)
z
E
z
tr
qJ
J
]-
utz
lta
=zlz9oF IIJ<oo<
=s=.rx|rUo<z
ttF
2,.
9z
-iFd63dOI
Jl<l
trl
zl
zl
,. >|olt,out
llJz
U'F
tul(L
z
Eo
uJlJ
ata
UJzxI
zIF
Jl
z uJo
z
Y
c
z
F-
d)
ar,
--i
wv)
o(5Ez.
Y=
;=od
F IJ-
o-lLl tJJYFur-dl
oF
tr
cc
ITJ_-._Lr-
'ttloFli{t
= PrlXnt
| *-t
EuJbkz6
z
,rPZF<(D0
=zff
a-,P
DDtr
J
"39=ae
=HEmhl
oa><ff
ua a.\z*E\)
Es $E^SE=ilE!!B= I-F cc
,= rr.J ;5ff g
=_z uJ -E-r- =90< "i ct6: Fi-+6 59E\ urElr- X tLt x>ouJ -- F
cL u', 'i€s=ds*:iF**
---
ts
=E
UJo-zoF
C)
EFazo
C)
6
F
Ir
t)
J4
^(A
| /.,)
V
Il(,tzq;
j
Jjt
trl
.L
b
d
{
fe
..J
ui
=z
(Do-)
o
o
I
;
.,
ul
=z
ic
\-!
{)
F
ra
aa
lr.l
od
Ja-
I/l
:)
/tI
,,.,,-j,/I
-t//Aq
trI
IA
n4I ol/4zlolAEl2
4r!Llol
zl
et HFl F
J
tla
if,l:nt =M'lI-l rrlr.t ut
tffi:
1Pl alst blFl zl
d6|g', Fl
UJJ
r.lJF
z
o
UJ&
>l
t!t
>l
3l
9lr-l
=tr =tr
I
I
ol
=.1ol
5|
EI
3tolFI
I
ql
il>l
ttlol
zt
3t
9lFI
uJ
uJF
(r
uJz3o
Fo
lrJ
E
C)
E
-rO<, I t -<-E <) '1')
ttt 4 ':'rZF(,':t.lF |/\AZ,,/ 'ol
-', -s E/tl 4OlTQF/r?.'4it E1'(J tA6-Jo
OOz, t-
=Q=fJZrro
i5YF
13
H=
=g
=
\JZ
<oEI-l
xX,.xx xxX
1
t
!:.1 t- I
!:
cp
o
.Et!
4'
4^
oM)
=t
a7
js
5_\
€\s
I t,ll-' Y
2:: l::
U
?quE )
/o
lnt r. , 't. l t,U
CALLER
INSPECTION REQUEST
TOWN OF VAIL
-J-4..,,. t
MON auaa ,''fiio THUR F R
PERMIT NUMBER OF PROJECT
.-- /- l-oerc 7f7f87 JoBNAME
READY FOR
LOCATION:
BUILDING:
tr FOOTINGS
O FOUNDATI
tr FRAMING
/ STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
ON / STEEL
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION tr POOL / H. TUB
SHEETROCK NAIL
tr FINAL
ELECTRICAL:
tr TEMP. POWER tr HEATING
tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr FINAL O FINAL
APPROVED -
CORREGTIONS:
tr DISAPPROVED T] REINSPECTION REQUIREO
INSPECTOR
I
oz
E
=Eulo-
oo
(v)
U'
IJJ
uJ
lJ-
F
=Eluo-
.7W L b,Q (.iysq_w v}t\
c'l
(f)
C\I
L
I
lNr3
l-l.i. C\J
IE.<F
L
I
I
I
I
t_,,
to
IE
to>,ztnl6t-:
r Jt4J':)-
gJ
eoF
e.F
z
zzo
I
t=.F
I
L;loIJ
lc6
l(JIFt<l=
I
lF;O
rtHo=
=^2.z-
6r-,.rfco
3*43o=z
6=
t/)IEl--{f--UJE
F<rroL!F-CJd.FU)z
(-J
ll.l
cct
FU''
=(.5z.
z,
lllz;
ulI
F
z
ttrIJtul9t39' lio t-E. J6-i .vl:€ \tFi $lE
iNl6Ftx
E\]E\tzo \fll
sNi
E\\$*'1E '{tr:: t;l
€\w,ESsIgN
Eo{ASE\
o\)
c)
tts-' - \o\>\9Yclclql
=.9
E
j-otr
u * 8.9)
rb€:
,:fi gE
C.= 6 cEZ.S69 6P:Ec-o>'- a,, =c:5i
=gi;c96EIoSor
d 5;.5
E EEI*.€8i
€ qef
$; seSErsoiE-ol
:€:€
E6:F
:EE H
E6E5
:-oE3co.-Eg= o o
ar or =.QgEE€
g B'-E
e:-eE
ifi:;9E o -e5g1
- o (6:
cr)\
O
c\I F
Ft
uJ
2
xot!
oz F
UJ
gJ
z
6:
J
z
gJ
=
ulul
2
tr
uJ
llle.
@
'uJ
uJEzo6gJo
F
aa
Xul
z
IJJ
-)
x
F
ul(t,
aD
u.l
uJt!t
E
IIJ
o-J
FoF
z
6
-J
6
J
o
EFo
UJ
ul
zo
=Jo
J
z
uJE
NO|lVn']V =
b
C
A
F
F
;
'Z zvo ooF^.nZq 5 =eF9 OE
ooEZ!(')9ir nt-tz;<E<9q iH6 x
=R Z
iN(,
oN
>G
Eur
=O
LTJ
J
t!tdo
UI
z.
C-)
z.
==
z
zotr
J
o
ul
o(?)
c,
tll
J
z
tr
t.zz
tr
E
UJFJ
=ulz
9)
2
z
tr
o
oFz
z
=J
UJ3
o!J
I
!Jc
z
F
z
F
EI
I
t-]I
I
t-i
tottolldl
ul
J
ou)utzY
i
UJ(l-
F
2
tr
J
oz
q
C
J)
i
F
ut
-_l]- ,r I
=Ft I.,cl
I
L--d f
'";.4-rd,
1Z \)'> I?G>tE]uJl1l<lzolE E]o Fl< .nl
z
(t)
.o
(\I
I6
.D
.l
@r\lOO
..x
J.
"4tua^t
4't
.,{'t,
/"1
7t
tr
U)ooa
zo
Fo-
uJY
uJo
oF
F
=CC
IIJ
o-
lto
Loo
I
ulFoz
F
@or
(\J
L
uJF
o
z
.sP
=edlo
=zd9
=E;
IYO
A;E
tr
=ul(L
EoEE22E<Cl]€8B9Eir
'EE
=>= u.t :-E E=o o-- E: >o--I Ou-E oo9 \urE XO-t x>t. q-o-'!E
uldlo,F
I
--
E
=Elrlo-zIF()fEFazo()
trntr
(Uv.d
(.)
L
G'o
UIc
J
(,
=J
u-
co
Fo)
4
I,/x
/6
,34=
Tz.
/=,.|
,4q),t tt)\(l''+.J1
(,1){+
ui
=zo
l-
IJJ
=z
an
UJ
2 6
!
o
=
(\
><o
uJE
!
E
o-
F6
h[r)
r
F(,/',
z,
(J
IJ
NI
J
=tr
oz
,i
ujEJ
ttoz
3IF
=e
lt
oz
o
uJE
t!qz3oF =
tr
z
ul
J
t!
z3
F
=
oz
otu
J
ltoz
=oF
=
oz
,i
u,l
J
lt
z3oF
ui
ul
t
E
UJz3o
Fo
LUtr
C)E
e.
<F
oa c)IIJ <zEl!F(42o
JE<oOF
fr3il,2
-3
E
9P
E?=c
d6
C)
6F
=3gE
Eo
d i.
=+Eo2 o
<c)stfr=?
Flnn
/.\ cLrJ O.' LrJ Ol- J .,-
|.-. co PE<.d
C< (-) CtlH.€ILJ-
(5 0- xz,< 4)
JU- t^
r---{ F< gt
LvC
d.3
utEo.d!J@o o{JtrJ ! (u
UJ qFzog(JE
tt1 C)F{E()
(5 l- (F
7_ q- a-
=L(no (l)pJp OJ P r,l)o(uLr- J <!
]d
aq
so
?r'\
{!
x
$
rl
\
x
\
\
\
x
(
\
b
\
X
U)ut
uJu-
trE
[!
I tJ \I
.qf ttlo
l$
la;t\
l'll0l\
)1.{i
{i
JI
r(l,\l\$lt
al
lr
uJ
=r
olt
F
Fz
lltz3vcr
|Lru
:5
ccv
<FZn
YZ(,t <
x
o
o
c)ooo
o)
=
o
E
o
=
()
o
'.q
o
6 n E.S,'=o(aXii i:';E6F,i
€fi sg
E'= E F
€ sE:;
cf :E:E3;
; >= X
-*=ot35;;
EEARi!Eo
:€35
€'e ee
Ei s s
cL (E o--cL= - o.g P O"oi6-orsfie€
P6c5ii* c or
;FEH
ieES'
(, 0'- .;!; o (/,
ar (D i,9.
aEfs:
€ B t+:
X '- o-!tEFe
i$;*9E-o -cEgg
- o 6i:
rl
\
tv!
rl
o
a
a_
.(
a
nqx
8l
\M
|\
I
f-.. t\r_\G
"l r. Nl
\
z
zz
I
\s
tl\
tii [tttl5
\
l:
J{
?i
'il
sl
elll,{)'l
E
uJo-(,zoJ
ao
YouJ
z ()
uJ
oz
(o
=
9z
IIJ
u,l
UJILz
F
uJ
u,
oE
3g
uJ
z
-U'
uJ
F
uJoc
z
q,
o
x
F
ulo
anut
trJ
fia
-qlo-
J
FoF
oz
J
9c
Fo
llJ
gJ
oz
dt
J
2
o
UJ
F-F 'r (v
NOrlVnlVA
uJF
E.rx(2 Z u-:o o o;tr ^ Az-
E A 3 E,q,0 E)
p ? E;o q ?:
H g E'iq 6d (\l (9*
J\\=
>E
PS I
I
\
I
0
t
;
\l
o
z
tr
{lr
6
ci
cfoE(J
ulo-
I
U.,
$
TIJ
-:
z
E
:z9F
EltFJ
;
UJz
Lz
z
F
o
I
trz
oz
)
Ltl
B
tll h
I ll =r_>(lollEl8ll zl.rt=ll
ll..'lI oI ll l,r.tI It ffI ll lJI z
K Y
tN
"$
E ltl>ttltrttlH lttJttl<tllz t.-t II =lElglF dlSlElg
uFtJt<tuJ<<,)laol0"lo
"ll<tlJtlotl'll
ilFtl<tlulllrtl
"Iull
u, I
IJ
>o
:l:r
!\
ulF6
-)
zo
F
luY
r.lJ
d)
|-t
E
lLl
o-
lt
oo
I
ulF
'z
€$g
iltd><Etu91 o-
#b
Es uE^3
E=6BH 9
-F CE
5fi I
F= H
=;35 Hi-r8 E9E I urE"9 *gHq -€qi
=utrd!ie**
E-GI
ts
=E
UJ
o-zo
Fo
EFazo(J
z.
$5!!n
a
tnlri!
Itl'l.tlg
-lg6.
I
e
(,z
Jtr
F
x
d.
3
E
':3
vltl3ns
ui
=z
d)o.-t
,
r{
d
oa.
ru
oo<l.J
=
d!
3
-,
t{<le
llJ
=z
(l ..
d0il
J
t
tr
tt
$
{,
a
I{n
{5
crl
stt
€
u.lEoos
=
B
*+i
\3
I
F
I€
r
t
=tr
4
Ig
.iz
ctul
J
>l
ILolz
3lolFl
o
ts
{n
,o
.i)
T
UJ
IuF
sz
E
tr
ci
|rl]
5t
al>l
!-lol
zl
=l9l
sl
2
=
u--
oz
o
uJ
j
ILol
21
B]olF]
Il
J
cl
o
=.1(,1
E
<l>l
tr-lol
e|
{a
c
I
I
I
I
cil
z,|
!rlEIll<l>l
'J-l
:t
=ol utFI F
E
LUz3o
F()
UJET
(J
E
.\ ar5iPGC)[!<zEL!Fa6
C)
-)I
UJ
U
Y);
-
))
E2?
=#d5
c)
ex:IF7 <-)
=tY,z
=g
Hd
\rz
O
<oftfr'l
>< ,x xXXxx.x
.o-Uonsheod Arcode Building
Condominium Asociotion, Inc.
Post Office Drover 9
\bil, Colorodo 8'1657
April 2L, 9L87
RE:
Town of VaiI Planning Department
LionsHead Arcade Building Condominium
Association Board of Directors
Window Box Remodel
TO:
FROM:
The Board of Directors of the LionsHead Arcade Building Condoninium
Association approves the addltlon of windonr boxes at Passagesper the plans submitted.
Thank You.
Kit WilliamsAssociation Manager
.7 i; 'i tl ;
l{7_\\\
\sv*.\".;;
INSPECTION REQUEST
PERMIT NUMBER OF PROJECT
'-/ ,o" "or.DATE
READY FOB
LOCATION:
INSPECTION:
CALLER
TUES WED
:l'
-.-, ; 'r I
THUR FRI
)
. t/oNi
BI
tr
tr
tr
tr
tr
D
ILDING:PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V,
tr ROUGH /WATER
FOOTINGS / STEEL
FRAMING
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
INSULATION POOL / H. TUB
SHEETROCK NAIL
tr FINAL
ELECTRIGAL:
tr TEMP. POWER tr HEATING
ROUGH tr EXHAUST HOODS
CONDUIT tr SUPPLY AIR
tr FINAL
tr OISAPPROVED tr REINSPECTION REQUIRED
t lr-l k Ionre 1- Al-D/ tNSpEcroR
o
FINAL INSPECTION'S COMPLETED
The belo,v items need to be complete before
giving a permit a final C of 0.
Please check off in the box provided.
FINAL PLUMBING
DATE:
FINAL MECHANICAL
DATE:
n FINAL ELECTRICAL
DATE:
FINAL BUILDING TEMPORARY C Of O
CERTI FICATE OF OCC1JPANCY
oz
E
=G,
uJo
o
c
cLnF
o
IJJ
uJlJ-
==
uJo-
Qrw-\ 1/ Ae L.l/hoh # ar,l (o
@
o$j
(o
z.
dd.
=
(o
Or
(o
liJ
o
N.P
!
J .tts+)(., r,
i,- .FtrLo:zo2
J
LUF
FIz
=
=z
U'
uJFoz
oz
6J
@
.d
=z
I
u.l
=tn
IJJ
"F
F
z.
E
lr.l&,
F
,an
EH
=":
.4
-l
C
Lr
L!z
(-
Ez
(-
z
LrF
F
=
dlr2
=c
F(J
UJ
o
=o
lJ-
z.
.J'
OF
culz3o
lllI|-oz
zoo
.Eo
CE
uJz3o
lto
tuE
F
zoa
11)
0)
(lt
.9
o-(E
'ot-
o
q
Q
tUqct([r
;
o
()
o
E
(u
oEoo
o)
E
dl
E
o
=l
Eo
o
o
6
3
.9
q)
'@-^
Ed
aE
o0)ob
ed6.9'6E';o
.oc!'v,o
Er-CO(e!
E
o
olc
oN
-oc
3oF
o.c
o
otc
Eooa
a!
o
o
al,
.9
-c
=o
o
E
.i
3(!
E .i:oti G'=Oo
sbE
t.2 R.Yo 669cc.= (tFfc
o x!c-o'.8s
C?r t:gPd'i =c9d
35;
3Ei
=tE,r-oo
cEo
€qeIi c.Y- 6o-(! 0-
3EE
(D! (r
E*e
Eu:EE Eo (5:
EsE;o
*eC6 0'--c; @P-E
gE€
36>oG=
:=E3i8
Bte9-o.oOEE! o Et
-o6
s
,o
oN
c)o
=v\t{
E
E
UJooz
=
co
!o
uJIoz
Jc
J
EF
uJJuI
(,z
an
Jo
J
Iz
I
uJ
=
UJ
uJ
z
tr
|rl
o
uJ
3g
uJ
z
6
uJ
F6
uJ
z
tllJo
x
F
ITJ
U'
at
uJt!
lJ-
F
=tIu
o-
J
Fo
zo
-J
@
J
ulJ
uJ
oz
a!
=JG
()
z
uJt
NOTMlVA
l=l=
-Llz.t.
.'-z
EFg6
o-
Xcr
=z
?Er=OL!
Es
3S
N
zz99ho- g:<-dE d
vro1>E9l!<o*
HgFO.i$i
=>E
= ,,,
=6
=ut
=
=(5
z.
U)
o
UJF
=,
at)
=oo
=
=
=L!z.
F<UJE,rED
d
zo
l
II
E
tlJL
oo
rf)r\
E
o-
uJg,
zo
F6o
5z9
?
uJ
3
UJz
l33sz9q<oo<
Yd
=Hxrr6o<z
aLz.
97
'.Ftro3trOI
F
uJ(l
F
2
F
\
\
a
=
I
;J
a
B
F
UJ
et+tFf.xl "lfl$,F--taITTIL-." II t(rlol<tStdt'''
I
lEaF
Jl<l
trl
zl
zl
>l
I
I
I
1
I
I
I
RIl!
luJI lrJlzl9)tr-l=
IHt:t<lz
t<
z
F-
dl
;lI
I
I
"lzl
Y
<iltl
(\l
I
f--,3
V)
OJ
Oc)
ul
ts
@oo1zo
F.L
llJY
UJ
co
oF
F
(E
ITJ
TL
lj- ,.o Io col
iEl
\? >lu-lrl
Hu,bEzo
z
o9ze
d)o
=zl-d9
EEi
=HE
=tr
uJ
o-
ILoEE
E<Cll€uE9!irb9trdl>
=ul:-E E=e dtr: >o-; 8b9 \urE XO-E ;taulo-itt;
H
F
---
F
=Elrlo.zIF()
D
E,F
CNzoq)
nnn
g
G'
(u
tJ)
o
J
lr'
oz
Jtr
vJo
F
J
=
t!
=
Fz.
E
J
l,!
z
")
G'
=
(U
rf)
uJEoo
=
s
st
Il.o
i
nt
tso =tr
at
u,/
oo)
=
-
6
Fa/,
=.
oq
?4
-'1--l
7
=tr
z
o
uJ
J
o
z
=oF
F
t!
Jt!
LdJJ
Ld
6
=t
t!
I
1r)r-{
z
rti
uJ
ll.
z
3
F
Ft\
LT
I
s
u
u
F
=e.
tr
=
tr
oz
('
IJJ
T
ILo
z13I =Etr
z
ai
uJ
J
a
l!
z3
F
u,l
ulF
uJz
=o
Fo
IIJF
?
E
t
-rO<FG(J[!<ZEUJFa6
(J
J
dF
I.IJ
-!f
Y
Y
E
2P
E3fF
r-6o
ix
:{F
=2+(l
VJ z^
=u
t
t irg
FtrOz<Ofi8=a t
trEn
Ilo
tbl<
IFtz
IIFlv
Itrlzl3locr
t! tljoz
,., B
cc\r:) uJ,- 'r<Fz^
o<
lrJJ
lo
()
IJJ
qJ
NOtlYn'tvA
u,
z
z
-J
€
o-
=zo,N
uJ
UJt!
=
LU
F
YIt-l
6
UJ
2
3llJt
z.
rt-
0l
(/l
I
a
]
==Y:?ii . o- <t)
=fFg 6
9s^>YOez3fH3>o
i .\i
\
:=\?ltr!t - t,
-=.7|
=qs
il,
t<
lo-tuJ
l'r
t^l;lzlo|'
Ftl
otl
:lt
zl
.. >lo
tuo
UJ
LUz
at)
=
ul
J
z
EUJO- trlo
F
lu)z
oFz
Ft4<OF1
> tl:
=Eo:oo<2
t:lol-
IEg.l
^t
;I
uJ llztl
ozz
q
o
F
u,
E:
E
tu
1-
i-J
=l ru rnL:(JC)C
!J '- c o
aq- +-)v lrr rF ltl
=
(Jv cl..- -i
rvcx
g.>*oc6c.rtt_ u1 L .+J
-.-?E ar
!! Gr a-
uroo5
LJ gF (Jzoo_-- (J F ovr_o?
Z(F o o .
=
s) _!a
=:9tcL--l 1'Jc,,=XJP(/OrO
rr- J (\J ! C
l:
----5..|
ol-
F
c
uJ: \:r
= 00 1;\+ei\;\t
ulF$,oEz.o
xl
bLI'
\4
sc
'O
=
tJ)L!
LIJL
=
Lu
u,
UJ
z
z
()
E
z
=
E
IJJ
x
tu-
z
o-
F
E
z
:)
\
z(J9zE
=zf,fde
J
,^1-6
Z=Z.E<-'1 at J-
=: ru(DUJ>
LJ I.-J L-IIFt-t>
UJ
u-
uJ
>lFI
<./):4
=
.X
1-'l,..I
=lui-- |
-l=lFI
=lol
J!
-Jl
u- li
ILJi
ll
trJJ
c,
:
o(,
o
€'
ag
q,
Rs
Y
3r)
z
tt
F
Fz
O
IUr
o
F
t--z
z
I
UJ
=
!?oz.*;C)>f+:-
:z
C)
EFo
uJ
--J
UJ
JO<FG()r,u <
I.lJ Foz
()
Fo
UJF
?
c)
UJz
B
ii
=z
-l
J<o0u)l! uJ
$
NT\F]
a-i
I
il
il
$
sil
>llFtl
(Jtl
oz
uJl
-rl<l>l
tr-lol
zl
BlolFI
z
o
uJlElJl
sl
El
zl
3t
FI
z)
olutl
--rl
al>l.!lol
zl
3tolFI
I
I
nFan
_O
.sl
a
.,s
g
o
I6N
lonts t
Ptan
w
*1'
L,'olJ5rl*+rS rfira.tJ-
?,
o
FINAL INSPECTION' S COMPLETED
The below items need to be complete before
giving a permit a fjnal C of 0.
P'lease check off in the box provided.
FINAL PLUMBING
DATE:
FINAL MECHANICAL
FINAL ELECTRICAL
ll FINAL BUILDING TEMP0MRY C of 0
CERTIFICATE OF OCCUPANCY
oz
E
=t
[Uo-
oo
oo
q
o
UJ
lrJlr
F
=t
IJJ
o-
-d\,tf,\ S8/b0/ rA
&r/PlE!#x)
llrl
tl I
$i*ti=r-l
1\ |
$'i,
J ;i .,fi
{ig EiE
o
uJFoz
o
=oJ
.0
oa
=z
t!Jl!
<t,
=I
EoIL
o
F
C)
E
zo(.,
TE
aculz3o
t!o
uJ
.ElF
2oo
tulz
=o
ulIt-oz
X-i=dt
F;;:g
'EEH:t
Ic€EE
i E:;;gEg;E
EE; F:
g"; E"gg
*EisJ
:EEgE
EEE gg
:-'i 3d60'-..-5a9.,,E
E'tEft
E s:E-d
iBiig
oq
rO
rr)
o
ro
(f)
=
IJJ
z
J
@
ts
UJ
z
J
F
uJ
uJ
oz
co
=
d
J
z
ul
=
UJ
llJ
2
tr
UJ
(J
llJ
Bg
uJ
z
UJ
Eo
o-
UJoc
z
UJ
o
x
F
uJo
tn
UJ
UJt!t
=E
uJd.
FoF
z
o
J
E
ulJ
IJJ
z
to
E
J
9z
I(,
UJ-
NOtrvn'lvA
oEl
r't +)l6 UllAEI9-lr..Grq,Eo-3<ZtLo Ou6z+
=9fE'-o.lrEUJr
*iEillJ
E€(,i
]<
=t>d E
7-
itr=o
z
5r
EPqro6bozrJ-<o*
F(J;oFO;(\j
zI
F
J
E
o
o
oeo
ul
oq
oo
o-lu
z
Eoo
z9F
E
UJF
=UJz
trz
z
tr
oo
o()
aFz
z
llJ3
(t
UJo
J
UJ(E
2
i
z
F
trI
(tt
v,lllzY9IF
isF
J
az
TL
IDJ
3
i
u,
ooo3
q)
-<€
Jl<l
-l
zl
zl
.. >loul
Itlulz(t
tr
UJ
J
z
E
o
z
tr
6
l=
I
I-l
ol<14 lxua
irE
(\I
I
co
(f
@
CD
t-{OO
ulF
o
IIJFo
c0o?zo
Fo-utY
uJo
oF
E
E
IJJ
o-
tto
o.oo
I
lrJFoz
=\.1oQr
Ffs
=<fo\lJ-
zo
)
dfi
2fr1
=uJI'1dd=
F
=ujo.tt
fa uJEO22E<lt606eE9!L
EE
=>
=ujl-E E=o * i'iiE :*-E 669 \tnE XOE X>t q-o=rJE,u
@
ts
=E.l!o-zIF
C)fEFazo()
tr!!
t-
1J,-
5
@!
at'(J
J-
l-o
N
roJ
z
lJ-
I
I
J,J
.o
I
I
il
I
6
-J
E
Lc,o
(d.p
=o
=
(c
ii
=z.
d)o
-lI
q
4ul
E
'1
qL
:u.l
=4
OOl(\l(\t
xocct
ur
6
=
str.-l.+
Iq
rir
o(J
rd
=o =g
LL
IJJ
)
=
I
-
;i tr
oz
ct
l,u
J
ILo
z3I
E
(J
(jo
l,r,l
o
F
e.
tr
UJ
cDo.{
oz
dul
J
a
ILoz3
F
Orsf
Irc|F\sf
ui
LuF
&,
tr
oz
o
UJ
cE
J
a
al.oz3
F
=
z
dul
!
t!
2
B
F
:g
z
o
uJE
Ito
z3
F
ul
JulF
ulz
=o
IJJt
E
<FCQuJ<ZE,ulF6Zoo
<oOF
;Qt<trg
=2UJO
-o
,n E^
>Y
=<z,e
d6
6F
=3g6
t-G ir
uJ
+G.F t--o2 o(J
<(J(4 anrir llJJO
I
!E!
(n
r.lJulr
tsEe
UJ
i$lH rtrI lro; II
'll
Ic{r-
><xx
><Xxxx
><xxx
><
I isgge
f€ig:€E ! ;.= o.YI i E^E{F
I E* iE;E =f;i o 6I €'i-lt-
I ;Fis;
I
=€giEI eEe€ 5
-Ei s g;EG;= 5FE;sj
f iScE
F€g$g
-o.:ofr- c f (D
€3E; s
st; €€
E li:st.F99
FE!; F
c r$€g
o(D
3ll,t
UJ
z
6ll,to
UIutltz
F
UJ
llJ
o
F
UJ
UJ
F
tu
('z
att
t!
u_
F
=
q
J
FoF
F
o
ul
z
4)NO|lvn.]vA
Iil*
i$lsl:l
-{5t
= ivl
g 3:lo f vl
Eil
5ls il'EN(9lxx
=)1
\q\
o--o
(,
()z
d*3(,()o.'i
l\la\
ts
z
Fo
F
z
()
t!o
UJ
F;
Jl<l
zl
zI
.. >lo
IU
qjzoF
=CEut
o-
2
9L
o
IUO. l!>oF
ul
J
z
o
F
2o
J
oz
U'Iu()
u,s
z
I
I
F
z
F
C'lutl
o
oo
I
I
otrz
o
=J
w3
llJ<zllo
||=lot<
t-
Il;lloltFl<l
!!l
=l:ll
;ll
uJ llztl
o
glo
ozI
o,
('z
Fla
ao
Joo
at,J
5
F
ur
ruF
z
<rPzQ
.llo
=z
dP
J
!gg
!F$
B;E
trtrD
b
Eul-.c.-.[!.1Od
.E=Zu)<:Z)d,€
oFX
aro!FhrH=t
c:=El&rl
!l501i u.r Igil
5h' I
tr:/,
E
coE.cto
o
!tT'
Fc5
E
Eot
o
q,
E
E1t
t-
'o)a,(-o
)zLo3
,/G(;:ftE
\\./ / TE
-
(,z
-tr!
_t
Fo
!
^.!E<?->rt|oo
J
3.r$k
r.3
:c,lt{'l. .vl\|
5l
HIzl
q'f
).
,
\
\
d.
I
\l\l
uJl
JI
u,rlFl
zl
EI
5l
:l
3cJO<t-c(JuJ<zEIUF(tZo()
F()t!F
()
J<oov,t! tu
-lO
<o()F
7- toi<
SEU
gF;o
=Ed6()
oF()
G
Fzo()
o*9
F-o2 oo
tr8n
\-9
s
g
-
G
\
N
F
o
\
t\
(\.
tr\
]
$
l*
ff
't;ti**lJ:it;i?rn\-e#ritrffixtii;fi;wnrrs*,ff*;s*lw,rWr*ri.--%*,ffi#
tA_: #litr#,.ffi',ffir'wtWtffi#
:.-1?r\
o
* -o-
r>
]
w#
Ap*owd
0rn,* ,/'1"/t
ao6 ottni
oz
F
=e,
UJo-
o
C)()
ott,sl
t
I
I
1
I
an
r,lJuj
lJ-
ts
=&
uJo
-Zf-rpt-, f3/f//o{- Rrt rbr4Tfn)
I
I
I
l.+rE
tg, @
,-< \.t-o
I
rEl-o
19<lH-
EEt76lo -cHF
UJ
E
eoF
e,F.2z
=o
=
o
uJF
z
z
J
lo
.6
zz
Ft-FF
eborot-.t-t!
lrJ
uJo
I
acott
o
E
o)E
-9oqt
.g
o-o.6
',oF
:
oo.,Jq
c
!'x
oG
o
ttc
.E
oItoo
CDc
E
o
E
o
=f,
do
o
CI
C!o
=.9
E
g
.9ooE
.tiq)ooo
c
.9
.9
.z!ll
o
o)
.E
oN
-og;oF
o
o
Eooo6
E
o
,g)E
I
o
o
oc(!
at
3(!
!t: g
EEg'=Oq'
sbE
E#g
E=E6F€c-o
P:5
-:
gF
d'I =c96'- oc
35t
EE-P+ooi:.oEisFf e.Y- (!
o-6 0.
$EE
oP o-'E €eE6:gE EO6:
EE E- o.;9+, c6 0'-5ae
E't Eoi]
'6>.9 (!E
EfiE
hfie9Eo
e5g
-46
oo
o
oO
lr)
cc
lf(\
oo
osf
tr
=a.
uJA
z
J
t0
-o
uJ
()
z
J
J
9
FogJ
J
uJ
z
E
Jo-
,
uJ
=
IJJ
u.lu-zo
tr
ul
uJ
;g
UJEz
6tlj
E
anoGqJo
2
ur
x
F
ulol
o
IJJ
t\A3
UJ
o-
J
FoF
o
=oJ
@
J<!oaF
C)
UJ)ul
0z
=J
-l
9z
I()
IJJ.
NO[Vn'tVA
Y
=ZZe-o ootr ^ azo=so? 'e 6 Et6 6 EcZiO.Fo (J nv()zxr!<o g
=,4-tdH:> 9 EE: : UT
*\=>E
A::s$
2o
F
f
l!
r.i
c
ot
tt/
F
oorJ)
a
uJ
E,
zo
F
=o
n
v)F
=zOa
koo<
>E>Exrr6o<z
(t)
E2..
2=-iF
EO}EOI
t.l
t1t'1tl
Ttl
l-Jtoltoltdl
a!l
aa
uJzYII
uJ
F
z
tr)f
z
-s
>..
;JJ
3
F
ul
3
o
o
I
<l
Ft I2tl-
--lxzl
--l
>l -l
Ff
O
Fq
t:
l!oull|lz
(t)
=
Eulc
azo
Eoo
I
\
5
z
F(t)
J
d)
\
\-l )
H z
:<(E
(l.
o
UJo
(\,1
I6
5
r-a
l-a
zo
Egl
uJFJ
=uJz
Nrlq,
Oo
<f@
@
o
r.u
Eooo
zo
Fo.
uJY
l!o
oF
F
Eut
o-
l!o
o-oo
I
uJFoz
u,F
o
z
oPze<loo
=zlf
dP
:f;*
=Hg
F
=(c
ulo-
lto
ul
z
U'I
F
CE
E
JFuJ-h>5co- lJ
=o-O|!9oituxo-x>
llJ '
f
l!
uJ
@oF
Eo
Eco
EI
'=r
5
E
E
8
o
c!'
Ettot---
E
=E,
lrJ
o-zIl-OfE
6zo()
!!!
ol
=.1ol
uJl
:l
al>l
t!lq
zl
=lolFI
I
I
I
?loll!ltcl
dil g
Ol rJJFI F'
F\(r)t\cr
r.o
F\sr
ql
<l>l
F
vo
!.
.E
(J
Iq-
otn
=tr
ro
r.osf
IOrsfo)
I-lol
=l
3l
uJl
5l
sl
:l
3lolFI
CJ
d,FCJL!Jtd
=lrl
=,
(5oJ
ccl
lrlo
d,
a/,z,o
J
U'Fd.
1J',
F
l)',
ti
Jd,
(J
ii
=z
6
-)
it'
E90Z,F
E#
d5
t-E irg+EOz
C)
E
<F(lc)r!<z.E|.ri F(42
E,
UJ
uJ
t
cI
nEn
t{-o
oO.FE+)
rt'IFErF .d
g)xcc)
3(u,! +t:c, i
a)E I+ro I(u(J I
-o- o I
F<l
(JF fu- |q- Ur IoE I
(,
=-:dp(o3-lc).Ld
l,D ! H
c!
flN -
il
T
\
!.,,
1.,
U
,\
\4
IH
l3
lI
lP
IF
t?taEIFlzlololtr
l;
l3loElIul
13i i
IrE v I
liE I
li*zi
o:I qi)
,|. o
)-)q)
'a6),Y;;
3o*,
C'
'$
aql
(.'\'c\
=
ct
DC;9;3
:11
;.a-r9i6:()lc
i.:
'6'cI
.S(
N(
-ol
3;oiFCo)
-oi'Eq)ol
bE.J6
Lvt
9()
9Y;orgc:)uoJF
>=)(5
-.=5;-: >,,9n-,
-cl) o1:<ti'O(l-Fric:g{
g6
iq)
i;o-cl
=<n:If
lg
.J
IU:r
rag
rt
'>- lo
c:
.o
E
c}rc'
o.
-l_-(
(u
d
0)
o
c
o.E.
*l
o.!oiOr
:=r
';9(!+o-
0l
el (
r\
IN
("
\\
at
tiJt!IL
L
e
lJ.l
F
F
tr
=l!
o-
;[,8
Fl
=lHl-;tsztr6loJl.Z
oE
3
IJJ
rtJ
z
6
UJ
F
UJ
z
tu
x
tuut
z ri.
=F
gJ
J
r.lJ
to
oz
gJ
E
NO[vn]vA g dl dl ilsl"'
tlI
tl
uJF
o
;e,o3
o<z:loQs 4.
FP69oQ-v2u- <(oqH8>oFol
xx
|rIz
UJ(,
X
z
tr s
,\v
:il ,gll I
Fll i.II Ffl=^il:
:fle< t fffru s
G
E
o (
=il 6
=ll =t|t xiil6Iil?
,.'*ff=
|
"ltl
rl
q
N il; ,/u/-/,
l'
lzlo
t!
IU'l?
:il-T I;ll tl
e,ll o!4ll F5ll < -'ll g i
:il ;E
= 3 Ecr o r
uJau.io
ltoo
!E
oJJ
It
gl
=cEur.t;=r
Etr>€ E 6sE' P'. =<; to iFE IT DED
;^E(I,d.er.lJ4c!.oo(9 .-Z.-
-Jo,_< 15u-sd,'eovr.r_ c)
ou)
Ll.J ('o<
L!
z.E
u)oF{ (J
(.'Ezdr-r L3q-
J'LJOO{J!-{J o
UJ r--
t-,Q,
a,
;o
v
\-.o
J."i5>Y2oF*J(J;:
6d=
brH=l
EHI
F3ls:l5-'J
t!=
efr
n3Fb_
c
E
Eot
o
€
I
liJl!
f\-t
I-i,J
,'.-|
t-
-t
-rl'-: Ivl
slF
-l$.
$|$::l I\| l
$$
fl9
q!
:,>
ErE
h!t\s1rr/
,d
{l
fl
Pl E
'ii=z
o-'t
F()
IJJFr
C)
JO<FG(J
LIJ <zEl!F0zoo
J&.
6P
F#
E=UJOo
J<oO tJ)uJ TU
gF
3Ed6()
6FZQ+[
sg
o,YF--- xr-- Fo=oo
><><><><x x
trRl
7;>/ iAou
SA.61ura,A aa)
r
fra { *Yaur7 /-c:
'l
/" Fo- Br-{
t{?-. /%,,
oa'
,rya,
a) n 16, ,ra,4^ur,,
o
Jr'ftt+t
:; $t-R
s
t'r \
u,:o
sq
lJ
\t
\
{<t
e$
tl$
$\q
{
N
a,
t
$
$
\l
.$
i$
t$Io
$s
\t8l
$ii$
D
s
{
J
s
p
stsg
.3
1(sl€slg
I
:t$
l(iri.
PERMIT NUMBER OF PROJECT
('-
INSPECTION REQUEST
i 'oyl ?:DATE i lj.ff r'ht/r./oa
"or.
, L..t,-
VAIL
READY FOR
LOCATION:
INSPECTION:
CALLER
TUESqoD WED THUR PMAM
BUILDING:PLUMBING:
tr UNDERGROUND
tr ROUGH / D,W.V.
tr ROUGH / WATEF
tr
tr
tr
tr
tr
tr
o
FOOTINGS / STEEL
FOUNDATION / STEEL
FRAMING
ROOF & SHEER
PLYWOOD NAILING tr
tr
tr
tr
GAS PIPING
INSULATION POOL / H. TUB
SHEETROCK NAIL
d rrruRl tr FINAL
ELECTRIGAL:
tr TEMP. POWER
IIECHANIGAL:
tr HEATING
tr ROUGH B EXHAUST HOODS
B CONDUIT tr SUPPLY AIB
tr tr
tr FINAL tr FINAL
APPROVED tr DISAPPROVED tr REINSPECTION REOUIRED
CORRECTIONS:
m
DATE /t.-2a -t r INSPECTOR
/q r:-
PERMIT NUMBER OF PROJECT
DATE
INSPECTION:
REQUESTv4l! rl) , ..)a- ..'. // :,
INSPECTION
TOWN OF
- -:i4 . .',I NAME
MON
CALLER
TUES -.,,-=.*--WED THURT FRI -;
\___...-'READY FOR
LOCATION:
t .!''/t '/ $e
BUILDING:
tr FOOTINGS / STEEL
PLUIIBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
n ROOF & SHEER" PLYWOOD NAILING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL
ELECTRICAL:
tr TEMP. POWER tr HEATING
tr SUPPLY AIR
APPROVED tr DISAPPROVED tr REINSPECTION REOUIRED'\ i,t
CORRECTIONS/
oor,- /i- /1:- 7ft' rNSPEcroR
ct
=
=e
UJo-
ooto
at',
r,uult!
tr
=d,
IJJ
o-
-zB ^/-//
I's-so2 Y)
I
I
N
v
I
/l
{r
a \aU
.l \\'
.I\$l
T\:{
\ I tr-l\':i-.t6
N
\*r=
I
I
I
luJ
l3
I
I
I
I
I,
IE
IEz
IE
t2,zlo
in
UJFoz
oz
6
=fo.!
o
=zo
8;*5 lH
a H;;E I;
$E; ei
€Eis5
:'Es560'-.=-SAg.'E
gE:;;
iBigg
o|r)
r-l
otf)
r\
oo
or{
oo
Or<\l
F
=E
uJo-
z
=
Y,o
uJ
oz
o.
EFotuJ
UJ
oz
6.
o.
J
-
UJ
=
UJ
uJl!
z.o
F
ulEolltE
oc
o.0
'g
uJczo6ulo
F
al,
d
UJ
4
z
t4l
x
F
ulol
at'llr
N
ts
=t
UJ
o-
JsoF
oz
=6
J
sl
6
UJ
ur
oz
co
==Jo-
J
9z
o
UJ-
NOrrvntv^
Ic
T
C
(|
-Go
=l!oz
tro-
E
8
uJ
c
uJz
uJg
t
\5
>e,
\r :la(b
zz.oo
F^atlli 5-sA 6
ooz>.89r!<oqH{-6
;oi
z9
F
F
oo
o.
e.
UJG
F
oo(O
E
o.
uJE
z
E
JItZ .^ze =r*BgfP
=gHH8Ba9<oofIltl
E?,n3 i rHI g =dlsE iEst3fi5o(,orz
zI
EJ
=anz
ul
J
?e
F
UJ-
a
gJ
Ju,
=
;
J
<tl
UJz
:<I
F
t\(\l
<\lIdt
z
F-
c,
uJ
3
uJz
uJo-
F
9F;bilP
!
l-l
t4
*c)AFI
o- Cv
=Fl
=(]ff,D
+J(J{
o.2.r!
gi
cr')
ll
t/)
o
l.r.I(./)
J(-)
L^l
=Lr-
tJ-l
J
rY
l
--1
z.t
nnn
El=sE
ts
=G,ulo-tl.oEgEA8ane.E9Ek
.= G,51F'J=ruEF:Fg ),,E5EoEqo-i!E
UI.ooF
z
o9za
coo
=zf>
dP
u,ITJ F(Jz.o
LTJ
z,
**:
O)O.;
=:-: ."E I
>- z. .
H LJ- t
)L! rE*
'OLJ t<t-g .ep )': I
))
J()
---
I
I
olullcl
JI
<l>I
t!lq
zl
3lolFI
.lol
=.1ollllI
ilil
:l
FI
=
,6
v,+)L
-ctJ>
It-
o,
!(t
-c(J
di
=zo
l,ltotI ull!t cl
El *lt:l
dalu-r Fl
=.1ol
uJl
5l
al>l||lol
zl
3lolFI
I
I
I
I
el
el
:l
al>l
Itlol
il sol uJFIF
.oJ..
z6
=
Jo-
z
Toul
e
uJz
Luo
-. c)
=+8,l- t-o2
C)
Etrtr
oz
b
=t
uJo.
t
s\ts
F
\
.t)r!llJ
TL
=
=E
riJ(L
tl
Nrllrll
l,rl oluFoz
oz6
J
.6
ozzo
llJrlj.n
.roIt
o
o
.cFzoo
.ro
crtuz
3o
UJ
F
z
ot
BgEo)
dEo-8fi1
s.E \
u) o. t'; o. I
E:--.t'JBs$
.ib $Fg\
_(,;
CC I
F E\q
eb
P=oo
PF
PSoo
8o(' ctr
o.E
P'=9digoO
EJ
Eg
o9
oo.cot!
.ri o
EO
:g6gos)
5Eo(!
ou5;8
.: {d
fc
SP
S.
-ti;toEF'i=
9(!o.5
3.t'E >,FOtEooEo'-oo-€i
-(uocL
E9eo
.9p('C
?; (!
P3,!-E
cF(EI
o'-6.e
(!) #
E€
a3q>
e-etr
H659dqrEEo E'ofit
lt
E
o(l)
F(!
E
o
o
5
.g
o
1to
co
(u
.9
o-
(o
o
E
o
CIo
o
(t
C'.c
oo)o
-93o
.Yo(q
-oo
o
A
'a^)
\
a,,
A
((
o
\
\
'U
F.
a
E
=
UJ
z
:l
xo
L!'I
d
9
F()ttl
llJ
oz62
E
J
z
o
UJ
=
(u
llJt!z
tr
r!
uJ
o
c0
3g
qJ
Ez
6
F6
G
UJo
(L
i
u,
O
x
F
UJa
a
UJulIL
F
=clu
o-
J
FoF
I
={l.
ti
ii
ti
t:
Ji" I
ffil
(,z
o
5
CD
a9E
(,)
tuJ
TIJ
(,z6
=J
J
oz
rour
NOUVn'lvA
-E,o
=2ZtLoootr ^ 6zq 5 t949 6E6-o AZr(J82 fru-<oq i9J;;.I,cSqriq fiiNO
v
\=
>G
\ax A:, \9 \)
\\
-d
)
a
o-
0
z9
)t
\
ai.
\
E
L
UJ
zo
Foo
zI
?gl
IJJFJ
3t!z
JlllF.29'a ZE
EafEgbSs
<roofIltlg*g I5cx 3 E ?9 -g =dgIsgE
o(,(Jr2
zo
F
Jl
U>z
ul
J
F
uJ
(9
tu)t!
o;
g,zJ9IFn(
(
0.;'\F
"-=bilP+
{--t\
o
ct)
r{r{;)
:)
u,F
o
llJFa
dto-zo
F(L
UJY
uJ
dt
oFt
c
uJ
o-
tl-o
o.oo
rl
lrjFoz
DNT
z
oPzd
coo
=zl>JO
O- t!
ts
=Elrl
a-zo''F(J
&Fazo()
E
CCr!
o-rlo
uloz
)o
an
oF
I
(\
JFfii ;!:='i(lo.- UJ>LOtLoo
\tuxdY>!tF
J
J
utd'
oF
co
E
EIo
cr
o!
.=ct
E
Eot)
o
tro
Et
tE
CL
C,!
dxoC)=
=-,r3
;$E
Bnrr::;
lltli.l I{t I5l sl.l $l?lcl\l ilIrl
=l il :c. l ol !ut!l Fl F
ol
=.1olurltrl
JI
<t>l
lI.lol
zl
3IolFI
I
g
nolull(lJl
<l>l
rqol
zl3lolFI
*ru
,.
Io
e
tr
I t$
rlsl +
;l$l
-
jlrl
$l dr'l HsgiE
4a<)
ro.
J
.\
tr(J
C^F
n
rj
1+x
u:
c
.l
1(-.
F!)-'1.{
+(to
?\t
<l
t{\
tda
N
J
(tz
Jtr ii
=z
dt
:'l
tirsi*E ,o2
(J
z
I(Jr!
E.oF(J
&.
l-zo
Fo
EFz,
J
9
FO
UJJ
E('o
Zts-
@9>d
:)Fd6
--r O<F(rour<zE
Lrl F(rzo
Fo
uJi.r
(J
E
Aoo2:o a
I
FI
@
?.{
F{O)
(\,1
@
I
<\l
FI
I
FI
II.J
ko
I!F
U'
@o-zo
F0-
uJY
ullo
oF
ts
E
lrJc
t!o
ooo
I
ulFoz
EFi
B;H
t
Gul
lto
uJoz
l.J'
at
oFt
Eo-
lr-tuJ -lh>l;sl6tlO -rli-tr UJI541:>tEFIJJ
E
IIJ
to
F
II
-
zo9z-<oo
=z=tfJO(L t!
E
=Elrlo-zoF()fE
6zoo
!!!
+)L(o
Poc
0E
U)
F
!
(U
!nt
I
Eo
-van
o,o
I
I
l_
rtto
I
I
I
I
U'
uJllju-
tr
=E
UJ
o-
6osqt
*\r- q
ltJ
uJo
=I
IEol!
GoF(J
EF2oo
Eo
6z
=o
tto
t!G3F
Eo
c lrcD lie; li
Es li
;E rli
'g e=:*li
EFq
.?z tli
sffi
Se .li
oo
PE
es\
H#,::s
iNr\tt cr s,
iiN
d:ggEs
g8E
EEE
FTEc-o'- tte:5
;gP€ >=
c96'- cL.c
aE;
E E-P+oo
iEo
€Eeg=E
cLo o-
SEa(D- CLEfie
E6:
e e.E
E 6-6
EEE_E.e
uvC
aE O'-5ag
egEE8iI3lo
;fis9E o
eEg
-octq
t>to
E
t:
FlcrIUD
J-F
E;
OP
5'6
IIJ Loo
tu
2.d
"'
=:
I
uJ
@
ooQs 3EP o
atoz>E9r!<oqH6E8j.i
F'-,.fr3 E?3=d
=iE3 s3orz
=oot
gJ
-lol(ol
ci
zIF
J
.t)z
z
tr
zI
Ee,wFJ
=uJz
-cr-l
oz
ts
=G
uJG
"l:l
EI
;l
EI
J
(,
=J
lJ-
Jo
F
o
I
ot
1tr.t-,Loq(n
q)o
fit
co(F
Lo,A
ui
=z
d)o
r
IJJ:
z
atl
ant!
o
-c
F =t
t!
aaul
=
Io.
E
L
<u
=o
=c
It
oz
ci
uJc
J
t!oz
=oF =e,tt
oz
ciulI
t!oz3o =G
lI.
ciz
d
uJ
=
tloz3IF
=g
tl.
z
oul
.E
J
ttoz3oF =cl!
o2
dutG
J
tt
z
=oF
uiJulF
!
(r
ulz
=o
i-
C)
UJE
C)t
t
-rO<F(l(J
IJJ <ZGUJF(qZo
C)
J(E<oC)F
E3
8E
tri
z6
=Jc
Y,)
z
6F
F3
g6
Eol-tr-t)g+EFt-o2<, <r
q"ffi
I
q
G
rl
Lo
h
I
14
\
I
I
\
N
+5
I
Ctq
L
CJ
-{10
-{
:
ctz
E
=Euto-
$rl
g
3l,-l
lllF
o
IJJtoooazo
Fo-ul!z
t!o
oF
F
c
lrJ
o.
IIo
o-oo
UJF.oz
z
o9ze
coo
=z=)l
o-- P
tr!n
E
=&
lrJo-zo
Fo
:)&Fazoo
tr
IE
UJ
o-
l!o
59EAtt€3B9A'L
.EE
=>>Jl-
=t!-E h=o * iliE :FE 56
9 \trtEXat.E ;;it ..1oiIri
|'|J
@o
I--
=fr*;Hg
,TIEtr ta
I
i:.\'t
P
E
(u
rF
+)L(!
+,
Q
.n
IJ
f
o
l-o
|.,L.v
+)o
vt
vtp
L
vl
(u
L
G'
lrl>
l6
I
lJl-liu
IH
IE
t€
F
.Ji t
H8zul
O'ez6p
]F.o6
06O
I
I
Il!!
.Fl<Icl
I
I
I
I
I,
IE
IEz
t=
tz
tt
r,lJ
uJ
lJ-
==E
UJo-
orx (!.Y,.=d69?*toiE8E;
=.c s? €*t E e
e-:(! -E f_.E 6E 6E:Ec-o>
=iE:c96E
-*=or35;=
E E-s:
:€85.e;9e
E! t'E
o- (! cL-$E;eoi6-or: fi:€
:(/lwo
Ee E Ho(E:--
F6E5
-o_go-- c fo o'- .=c; @ !l)
s$; f
*e1=P:tr5
;ffE
eEgg
=
Etll
z
r0
o(o
3
uJ5ul
z
6lu
I
I
EI
el
sl
Ll'l+'l:lol
+tl
C)lLI
l-
F
lF
li.'t.
H
.lln
bF
:x
YL
EH
8.6Scoo
J
ffi2'4
U
=
rat
= (\l
\*J \N':
zz.9oF^AX:lZE90.1, o5doz
t! <(oqHqEE
.i<\i
uJ
F
dp.i rpE=duJ F uJ
=r(r
=g!!Ouroorz
=o
o
UJ
^lg,lOI,r) |
4
=z
z
=-)
UJ:
z
tr
v>zz
t-
UJ
H
FI
o
Lo-
tn
o
J
z
=t!
I
I
d
FoJ
o
o
a
t^
+JLo
U1
(1,(Jcr!
Ioq-Lo
ii
=z
c)
I
lu
z
l!t!cc
I(L
F =t
lu
o
a
I
L
{J
=
=e.
tr
oz
cilrl(r
J
ioz3
F
=tr
oz
ciul
I
t!oz3oF
g
oz
oltl
G.
J
t!oz3oF
Ev
z
ti
uJ
J
a
lt
z
=o zE
tr
z
o
uJE
J
t!
z
3
F
uJ
trF
tllz3o
F
C)
lrJF
ToE
E
--r O<F(rQ[!<zEt!F(rz
<o()F
E3(Jttu,2Ii
E
2P
=<zE
-.6
-) tY<;otr
=2+&AFiz
=g
E
=i-b2
O
<c)a?.u] H-1
t:
'd
?
d)
oz
t-
o
'8
s
o
n;
a
u.lut
LL
b
=Etll
t\
l
I
I
I
.1,.1\:
lal
7-3
lrl'r
Fo
7_
t!)
UJ
<n
=1-
o
(roFo
F-z
o
ls;fi6$:i!;3e
WFt;;.$
. c:.!l (, * -l:
E€t E 5;rsiE:3
"rteE33{'3gE.'
;+ ti:Fr: PG Felf o5 o,Ir: F =.9
o
*iaF$l=FEo;cJ:€3t:\6 - O O +*,= P ar- 6
v,; !.9 €(r:-o"(\t :.1 O€!gtFg;
:EEEsX cr, ." O OEEEfi?
o(0:'-:'
!68$E:3f 3d
r:; o o tri iis.r5.r 'ii -c c =rf ;.Y *:
9;? SrrJ' t o >r'q -c,o$:;a)c-=->
E{ E: i
as:;:oEggg:3P-69
E
\It
o
o
q
s
o
n
l|I I
al
s!
o
o
Jr,
o
o
s
\
o
0
$
a
o
o
d
b\
s
In
n
l\
frraq
$.r-sq
.HlJ\
SrIt
{it-
1d
q
rtF
z
z
J
m
6tt
z
lr
Ir
ln
l$
'P-
:t
c(
Li-l
z
of:
co
:':
l:
o-
J
E
out
(,z
(o
:E
;
o
va
uJ
tr
IY
o
offl*
!_r
Gz
a
Lf
E
u.J
o.
?z
!!lJo
X
Ft!a
an
UJ
lr.ltl.
=
=
FoF
:,t zo
=
CD
EF()
lJJ
6
oz
:
-Jo-
-.t
Iz
I()
l!:t
NOrlVn'tVA r5l F I)
l,(l
\
el
ulF
o
F
F:
q
t'.
ti
T
)€
!
c
,S
t
'*zzu
tr ^ 6zI5 >SF 9 OE
e1 a5cz>-ooo!4(jzX
LL 'f9C dur tisx inaXz
d<\to
(1l
:
E
I
tltl{l,l I'll
]I
ll
i,l
l$l
l;l
{,gl
zotr
f
<t
F
o..
f,
o:(J
LU
F
Rs
!s
CT
|1
UI
z
c)
Eoo
zo
a!uF
z
z23<sG*:(o
r-r (l
-;>fio>()oz
lrlttlttlttl
6
u, i,"i r?&=drlr F
=xgiiOr!<)urO
z
z
tr
9><o2-r)
ot](J LrJ<dltl| .rllril
=:
-l -!6r{3E
F
zo
F)f,u)z
lrJ
Lt-,
l:
d)
Lil
o
=
ii
U)
U'
z
:<
iF
ss
0r'!
^fIq
gJ
o-
2
x<!Lxto
JFx
LUA
sdctt\
l
{s
rn- I
-)
zl I
-9r.t
rrt{
sF
F
(E
lu
tt'|-t
;{8:i\
!r5rz(
i
ts
r
J
oz:tr
Fo-)
-,
\LI()
of\!
c(
\$l6
€
C-
{o
l\hl:'.
| .t'llv)lr.ts.lc-
'L\ I ir\9t r\ai c-cti .
,)(l.oltol 3vl
'ul J
Ri aYl >:J)-
5c)
(
D
{itl
=v)
\.tl
urf-\/l
4
JlJI ''el uJ€l 'a
€l F{r\.1 1-<l '
olrl
ol,;l S
AulJq(.q>
dgo
d
outlil
<t>l
rLlol
zlijlolFI
v'ft-\l€v)
$
Ists
CCc
a({JF
Llt
d'-
I
I
I
I
I
I
ol
=.1(Jl
uil
5l
al>l
u-lolzl
otl-lL]
2l
crl
EI
I
I
I
I
I
I
Jol
=.1(rl
urlql
<l>l
|l.1
5l rol r!t-l F
tt
ul
a
>J
tl.
ol
zl>l
pl =c
I
I
I
I
I
I
OI
=.1olrul
5l
<(l>l
ulilrilJoi uJf-t l-
-uJ
z
.J
lL)z
Fo
UJ
F-
:r
.dFoa()
l"U <
iuFa') r-()
<()
i-<
U
(,OZr-ro9
-.8
JZ
()
<;i(J:
i:i;ti il
:=3
E
2
\.,, z
..-t<oat !4UJ L!
JC)
z
.^:1
ZE
z-z
o- rL
dffzEt35rj)fuJ(DLr,E
D!tr
tr
trlrj(L
o.r.r !l59E<
ov)
*o
vt
.EE
f,:
FJF.
=u.l-E h=Q rY rt,o dfio x:.., X'lcvL,q, t- ,,,F..tr!r x>rJ::.:Fdi4"otr
[J
{Do
F* tb
E lE'E, t;trJ t--
o-ryLo
F()
DEFazo(J
/qx, l.- --rI '"'rlb::':\'in#\ i, F--\\ ,,/ le.t\_J-Jr__
sa trt_lil
tNs
o
PE CTION
OWN OF
REQUEST
VAIL
DATE 3-vL3 JOB NAME
READY FOR
LOCATION:
INSPECTION:
0 L,
CALI-ER
BUlLDING:
tr FOOTINGS
tr FOUNDATI
tr FRAMING
/ STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr FOUGH /WATER
ON / STEEL
r-, ROOF & SHEER" PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL
- r"lJ"-4-/2 B FINAL
ELECTRI
tr TEMP
tr ROUC
tr coNt
tr
GAL:
POWER
MEGHANIGAL:
tr HEATING
O EXHAUST HOODS
UIT tr SUPPLY AIR
tr FINAL&K
/2 7r4 tr REINSPECTION REQUIREDEDtr DISAPPROVED
COBBECTIONS:
INSPECTOB
INSPECTION
0 OWN OF
a \{
REOUEST
VAIL
DATE 3 -vy3 JOB NAME
READY FOR
LOCATION:
INSPECTION:
BUILDING:
tr FOOTINGS
tr FOUNDATI
tr FRAMING
/ STEEL
PLUMBING:
tr UNDERGROUND
tr BOUGH / D.W.V.
tr BOUGH / WATER
ON / STEEL
n ROOF & SHEER- PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL
n r'l
d rtrunr o ilo n 4 '-{r, o( oo ^ ,, z, oY rrrunl tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr HEATING
T] ROUGH tr EXHAUST HOODS
tr CONDUIT
n
tr SUPPLY AIR
""#O FINAL
,/z 7,/t tr DISAPPROVED tr REINSPECTION REQUIREOTPPFIOVED
RRECTIONS:
ol;e "'"- 7l-l rNSpEcroR
r*#"roN neouidr
TOWN OF VAIL
_J,--
DATE
READY FOR
LOCATION:
INSPECTION:
JOB NAME
MON
CALLER
TUES
l,-, "rtFRl
!
.y'- \
1lAM ,'PM '
L\/WED THUR
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr FOUNDATION / STEEL tr
tr
tr
tr
tr
tr
tr
ROUGH / D,W.V.
ROUGH / WATER
ROOF & SHEER
PLYWOOD NAILING
INSULATION
SHEETROCK
POOL / H. TUB
tr
tr
u
tr
tr HEATING
tr SUPPLY AIR
tr FINAL
tr APPROVED
CORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
__').1
,"#"toN REouEsr
TO,WN OF VAIL
DATE
READY FOR
LOCATION:
INSPECTION:TUES -WED THUR
JOB NAME
MON
CALLER
FRI AM PM
BUILDING:
tr FOOTINGS / STEEL
tr FOUNDATION / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr FRAMING tr ROUGH / WATER
,- ROOF & SHEERtr ijiwiobo Nnii_rruc tr GAS PIPING
tr INSULATION
-
tr POOL / H. TUB -tr SHEETROCK NAIL tr
-
n-l-
tr FINAL tr FINAL
ELECTRICAL: MECHANIGAL:
tr TEMP. POWER O HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
-
lr'
tr INSULATION
-
tr POOL / H. TUB
FINAL tr FINAL
.tr,APPROVED
GORRECTIONS:
tr DISAPPROVED tr REINSPECTION REQUIRED
t'DATE INSPECTOR
#rn#crloN neouisr',
TOWN OF VAIL
-i\. -i <-DATE JOB NAME
INSPECTION:MON
CALLER
TUES THURREADY FOR
LOCATION:.'t
BUILDING:
tr FOOTINGS / STEEL
PLUIIB ING:
T] FOUNDATION / STEEL
tr
tr
tr
tr
tr
tr
n
UNDERGROUND
ROUGH / D.W.V.
ROUGH / WATERt] FRAMING
n ROOF & SHEER- PLYWOOD NAILING GAS PIPING
tr INSULATION POOL / H. TUB
F\SHEETROCK NAIL
n
tr FINAL tr FINAL
ELEGTRICAL:
tr TEMP. POWER
TIECHANIGAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
n
tr SUPPLY AIR
n
/,7tr,f'tNAL tr FINAL
,{qFi^ouro tr DISAPPROVED tr REINSPECTION REQUIRED
,' CORRECTIONS:
,*ril"toN ntouidr
DATE 4 v''1 <; y l'x s-t' '*( --,)
rowN gF
, i1,1
VAIL4"
CALLER
./'-'-, ,""\READYFoRlNSPECT|oN:MoNTUESWEDTHUR1rnt)-AM(puir / \- -,/ ,/) ;: \- -'
LOCATION:
' t/,: { -l ,
BUILDING:
tr FOOT]NGS / STEEL
PLUIIBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
tr FOUNDATION / STEEL
tr FRAMING
n ROOF & SHEEB- PLYWOOD NAILING tr
tr
tr
r-1
GAS PIPING
tr INSULATION POOL / H. TUB
tr SHEETROCK NAIL
rl
tr FINAL tr FINAL
ELECTRICAL:
tr TEMP. POWER
MECHANICAL:
tr
tr
o
n
HEATING
i{nouen EXHAUST HOODS
tr CONDUIT
n
SUPPLY AIB
tr FINAL tr FINAL
CORRECTIONS:
APPROVED tr DISAPPROVED tr REINSPECTION REQUIRED
earg I l'^ ,:.t" * f' L rNSpEcroR
iz l.r'
'N#cndn REouEsT.
TOWN OF VAIL
ll t/-f f,-ro"NAME
}\
I C:'
'-! , r t- ..6'h r
t-*i.7/r r I JDATE
BEADY FOR
LOCATION:
INSPECTION:MON
CALLER
TUES WED THUR PMGat
tr
tr
tr
tr
tr
tr
B
FOOTINGS / STEEL
FOUNDATION / STEEL
tr ROUGH / WATER
ROOF & SHEER
PLYWOOD NAILING tr GAS PIPING
tr POOL / H. TUB
tr HEATING
tr EXHAUST HOODS
tr CONDUIT tr SUPPLY AIR
VED
CORRECTIONS:
tr D]SAPPROVED tr REINSPECTION REQUIRED
DATE
r-.,,*#"toN REOUEST.
VAIL
DATE
READY FOR
LOGATION:
JOB NAME
INSPECTION:
.fact ---r' yoN
.t' ./ .n-nz
THUR FRID /= F) en,
'r' j
CALLER
BUILDING:
tr FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH / WATER
T] FOUNDATION / STEEL
Xrnnl,lNe
n ROOF & SHEEB" PLYWOOD NAILING EI
tr
tr
n
GAS PIPING
tr INSULATION POOL / H. TUB
tr SHEETROCK NAIL
tr
tr FINAL O FINAL
ELEGTRICAL:
tr TEMP. POWER
MEGHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
n
tr
n
SUPPLY AIR
ot,i{,tr FINAL
'.r'4 T] DISAPPROVED tr REINSPECTION REOUIRED
, CORRECTIONS:
DATE INSPECTOR
rn#cno,. TOWNi -1--
N REQUEST
{: ! :.DATE
READY FOR
LOCATION:
INSPEGTION:
JOB NAME
MON
CALLER
TUES
BUILDING:
F FOOTINGS / STEEL
PLUMBING:
tr UNDERGROUND
tr ROUGH / D.W.V.
tr ROUGH/WATER
tr FOUNDATION / STEEL
tr FRAMING
n ROOF & SHEEB- PLYWOOD NAILING tr GAS PIPING
tr INSULATION tr POOL / H. TUB
tr SHEETROCK NAIL
tr
tr
n
tr FINAL tr FINAL
ELECTRIGAL:
tr TEMP. POWER
MEGHANICAL:
tr HEATING
tr ROUGH tr EXHAUST HOODS
tr CONDUIT
rl
tr SUPPLY AIR
orlK tr FINAL
4*FP;ouEo tr DISAPPROVED tr REINSPECTION REQUIRED
CORRECTIONS:
DATE ,1:]- Z.a INSPECTOR
E
c
-{e
==,
et
-l
l-
o
!
m!
3r
{
t-nt-
ofl
|n
m
m3mz-{
cz
m
m
-i
-{
t-
n-
m
Itz
m
-tm
r-€>!d>=trF,{+c>@- <E
F > '- = ,F5;;Hx.!rE:;:;t!:;ii<:zFl o>H O>.)H.rFllxEE>67(V2zit zt >:
72eaE
SBfrT!Z '-'a I
'rzA':>
6oii>-iiE:F:'lFE<:r!<EEI
oz>€
{z
F'
o
zrl
o
']
ofs:-t{fia
z
-
z
I
m
D
o
t-
m
-l
INSPECTION RECORD
(For Department Use Only)
I Phone476-23ro
hours advancs notico r6qulrld tor Inspectlon3
rHrlnrvr rs ro BE PosrED oN JoB
SITE AND ACCESSIBLE TO I]TISPECTOR
REO,
INSP.
SPECIAL
INSPECTOF
APPROVAL
DATE COI{MENTS / LOCATION SIGNATURE
(92
o
lo
SETBACK
FOOTING
FOOTING
FOOTING
FOOTI NG
STEEL
STEEL
STEEL
FOUNDATION WALL
FOUNDATION WALL
FOUNDATION WALL
FOUNDATIOT{ WALL
FRAME
FOOFING
ROOM VENTILATION
FIREPLACES
WALL COVERING {INTI
FINAL
0z
l|lE
APPLIANCE
SYSTEM
FINAL
z
6
=l
4
II'ATE R SUPPLY & DIST.
ORAIN & WASTE
VENTING
STANDPIPES
AUTO. SPRINKLER SYSTEM
FINAL
J
IE
oul
uJ
SERVICE ENTRANCE
ROUGH
ROUGH
ROUGH
FINAL
ORDEB LEFT
STOP ORDER ISSUED:RELEASED:
CERTI FICATE OF OCCUPANCY ISSUED
REMARKS:
NOTE: rsrs cARD rs ro
HAVE BEEN
BE RETURNED TO THE BLOG. DEPT.
MAOE TO AUTHOFIZE ISSUANCE OF
AFTE R ALL FIEOUIRED INSPECTIONS
CE BTI F ICATE OF OCCUPANCY.
L-"-
Town of
ELEC1TRICAL
Vail
PERMIT rob Name.r. vru s. 4.e.4..b.... (-..a m m r"e.et n.1... 8. +..b- k "...
( ao. r.t <)
Date of Application.... ,....}-l5.t-t-*6..L&.....-.-5............-..Ie-.....
".y'-........
Electricalcontractor...ilEA......€.*f .(f E/.C../....T{.1J-c.
Applicant.
APPROVALS
85N9
Building Valuation
Electrical Valuation
Permit Fee
Inspection Fee
Total Fee
Dat€
5-....De.-e...4 ...
DrtgOtttcl|l
THIS
JOB
FORM IS TO BE FOSTED ON
SITE DURIilG GOI{STRUGTION
24 HOURSi ADVANCE NOIICE
REQUIRED FOR INSPBCTIONS
$..Eaor YP?)
Date paid....... .............1.7:.5:..!./.
*. -20.00
txt t. r. florarar !0.. oa||vat r0lrtl
Ft l?
PLUMEilNG'/ MECHAI\IICAL PEFIMIT
TOWN OF VAIL
r}AcrolV,,,|i- Ao-n.== &-e- PHC,NE ?(9{86
OF BUILDING:
oF woRK: Kl ruew E eoornon E aeuooel E nepntn
/*€*nat7 ,
PLUMBfNG: NUMBER lg33 -P MECHANIGAL: NuMBER IEZ.Z -4.-
VALUATION$ -? o/)n_ DD VALUATfON$ /O. AAA. ad
REMARKS:REMARKS:
./AJA.,aaz,,< FtZ€
At+t ?S
PERMIT FEE /5q.PERMIT FEE 75\E
E olseppnoveo
EQ
//-/s_ lY
?o2 S__
15 Nau 7+
DEVIL0PIltilT IOUTI;16 SLIP
PROJ ECl
oiitJ E R/0E vt t oP[R
SUBI.I I T] I AL DATE
eNTrTrts
DATE PROCESS ING OAT E
RECEIVIO DL:ADLtIiE COI.IPLETEO SIGi.IATUR€ R€I'IARKS
PREIffitNARY STAFF u-P
HASTER PLAIT
, l-ANDsc^plNG _4_f?29j.Ee€rJlqg9_8re*a. @t .r'atxF,;tL
li:fii?ll3- url;re Gunttit
ENGR. CHEC K
DES t GN CHEC K
ENVIRON14EIITAL
. |UPACT REVTEW
. EI{V I RONME N TA L
I I.IPACT REPORT
zoNlNG cHEcK,rF -iltdl+tWg+'A-W.-W-Pn ruJ!a,A)/
PLANN. coMM. ,llenrence _coNDtrroNAL usE
. BU I LD ING DEPT.
. EI.ECTRICAL
PUAI tC WORKS.
fIRE DEPT.
PLAN CHECK
ECH/PL8G.
PUBI.ICAT I ON DAT E HEARI NG DATE
FEES:'' IYPE AMOUNT DATE PAIO
Y^Rr^NcE lle--
COND. USE
E{VIR. IMPACT
PLAN CHEC K
. RECRE AT IOII
PERU rT , BLDG. _ --___________._
PLUI.IB I NG
MECII AN ICAL
REMARKS
ELECTRICATBgtio*v,'oi-
FROM:
RE:
MEMORAN DUM
TERRY M INGER
J IM LAMONT
LAZ IER L IONSHEAD PROJ ECT . REQUEST FOR VAR IANCE
DATE : SEPTEMBER 3, 197 4
It is the view of the Community Development staff that the requestfor variance by Robert T. Lazier for eight parking spaces requiredto be within the buildlng to be located adjacent to the existingparking st r uctu re should not be granted base d upon the app licantrs
arguments for the fo I low ing reasons:
l. Article l4 (0ff-sireet parking and loading) - Secfion 14.100of the zoning ordinance sfatesr?ln certain disfricts (which
applies fo this projecf) all or a portion of the parking spacesprescribed by this article are required to be within the mainbuilding in order to avoid or to minimize the adverse visualimpact of large concentrations of exposed parking and ofseparate garage or carport structuresrr.
There can be little doubt that the existing condition of thisslte obv ious ly has an adverse visual i mpact . Further, in ourjudgment, the proposed separate carport structure would not
lessen the adverse visua I imoact
The argument has been advanced, though not formally, that aprecedent was set with the approval of a similar variance
request for the LionSquare North project. I t shou ld be notedthat this variance was permitted to preserve views from the
Monfaneros project by allowing the proposed building to be ofa lower profi le. Second ly, extreme care was taken to requirethat the enc losed pa rk ing was substantia I ly underground andnot viewable from principal view corridors. Consequently,the visual impact of fhis variance was of more benefit to thesurrounding neighborhood than if the variance had not bee npermitted.
Article 14, Section 14.400 (Off-street and Joint Parking Facilities)states that trauthorlty to permit off-s ite or joint parkingfaci lifies shal I not extend to parking spaces required by this
ordinance to be located within the main building on the sitebut may extent to parking spaces permitted to be unenclosed.
Clearly, the intent of the zoning ordinance demonstratesthat *he Lazier proposal is not permitted. Further, given theexplicit language of this section, it concerns us that a vari-
ance granted in direct opposiiion to this provision wouldseriously undermine +he legal stabilify of thertEnclosedtrparking requirementr particularly in CC2.
It must be noted that a similar legal quagmire was created in
CCI using the same presentation tech n iq ue th af is be ing used
2.
1
Page 2
September 5, 1974
for the L ionsHead p roject. We fee I if is essent ia I fhat the
Concil unde rstand the fundamenfal nature of the project.0ncethe underground or enclosed parking concept is compromised,it opens up unlimited possibilities for othe r exis-ling sites
to request variances. This would in essence allow existing
underground or covered parking to be cgnverted to other uses.
Secondly, as was pointed out in the CCI staff memo, there are
obvious visual benefits accruing to the community by removing'the automob i le for surface parking areas. Further, that under-
g round parki ng shou I d be treated as a non-renewab le resource--
once gone, it is vi rtua I ly imposs ib le to rep lace. Surface
parking can more easily be adjusted according to demand and
surface aspha lt can eas i ly be turned i nto landscaped area
shou ld the oarkinq dema n d diminish.
Article l9 (Variance section 19.600 - Criteria and Findings) -
A copy of criteria and findings is attached, The Lazier project
does not, in our opinion, meet any of the findings set forth
in th is sect i on for the following reasons:
a. A variance can be granted only if there is an ttunnecessary
phys ica l hardsh ip". Counse l for the app l i cant has stated
to the sfaff thaf parking could be physically located wifhinthe main building. lt is obvious that locating parking within
the main building would diminlsh the available commercial square
footage thus creating an economic hardsh ip, wh ich is not grounds
for a variance.
b, The app licant has not demonstrafed any rtexceptional or
extraordinary circumstances or conditions applicable to the
site?r. The very fact that he can physically locate fhe parking
wifhin the main building and that he owns the site on which the
parki ng must occur and that grades, access points, aisle widths,
setbacks, etc. all meet zoning standards, point out that there are
not except iona I or un i q ue c i rcumsta nces .
c. At no time has the applicanf demonstrated that not granting
this variance would deprive him of rights enjoyed by otherproperty owners in the same disJrict. 0n the contrary, great
pains have been taken to insure that this area meets the pro-
vision of this ordinance. For example, LionSquare Lodge,
Antlers, Treetops, Vantage Point, LionsHead Centre, Sunbird
Lodge, Montaneros l, Westwinds and Landmark have provided at
least a portion (in most cases more than 50fr ) of the required
parking beneafh the building although they were built before
this was a requirement of zoning. In fact, the Village Centre
variance was approved express ly for the purpose of removing
surf ace parking f rom public view.
W:
This project presents a particular di lemma in that:
l. The addition of a new building will in all likelyhood improve
the visual appearance of the area given proper design controls.
Page 3
September 3, 1974
2. lf a strong case cannot be presented by the developer that hlsrequesf for a varlance from the enclosed parklng requiremenfls totally unique, then a potentially damaging precedent
cou ld be estab I i shed.
Therefore, we suggest that the developer be required to presenthis argument ln terms of his proJectrs comp lete uniqueness fromoth€r projects in the same zone district. This must be done so thata clear dlstinction is established so that other developers cannot
use thls variance as a precedent. Fai ling to achieve this distinction
we recommend that a completely enclosed garage be attached to theproposed bulldlng on the west slde. Thls would bring ihe project
Into compliance with the zonlng ordlnance and allow for the necessary
commercla I square footage to be constructed. A second a lternati vewould be to require that the parking be provided within the bui ldlngwhich is feaslble, buf would signlficantly reduce the commercia
sq ua re footage .
This project raises basic questions that, ln our view, requlre adetailed investigatlon by the Town Attorney. Caution should be
exercised to see that all legal requirements under the zonlng ordlnanceare strlctly adhered to.
o
o -3- 7t26/82
4.st for exterior alteration
A
and modification in CCII District in order to
o0r snoDs rn e Lron's Prloe butl0lnq. Appllcan : Steve
Jim Sayre reviewed the memo. explaining the sub-area concepts involved. Alan Tafoya,representing Ruoff l,Jentworth, the architects on the projeit, showed plans and ele-va-tiohs. Corcoran reminded the members that the actuai ficad6 would bb consideredand discussed by the Design Review Board. Trout, nevertheless, statedthat he felt the design was poor. Donovan pointed out that in this case there wasa fine line between the decision of the PEC"and the ORB. She felt that the elevationsshould have been presented showing the second floor, as the appearance of both floorstogether would influence her deciiion. Tafoya felt that a pebbstrian mall was createdDonovan disagreed, and felt the effect was a negative one. Corcoran agieeA-wittr
Donovan in that there was a closing off of the mall space. Viele askei abour tneovera'l'l design plan for Lionshead and was told that a'bond election-was in itre worts
TPr.tlg next spring to complete the inprovernents in Lionshdad. Jamar pointed outthat there were not p'lans for,that buiiding, but that Study Area #5 would go into
ilf|.l,'.meaning that this building would ei6ntually be torir down. faiovi iiaiiOthat this was to be an interim measure. Viele questioned the life of t-he building
1$ fesilaled to approve a-stop gap measure. Tdfoya answered that it would depeidon when Bob Lazier could afford to implement Study Area #5.
Tafoya stated that the shop owners were willing to spend the money to improve theirstores. P'iper fe'lt-that it was important not io look at the chanles as inougn-tttey
H::_jtl!fit_911v:, for many so-calied-interim nreasures in Vail weie stiil stinding.morgan felt that the park'ing fee should be paid by the landlord, anci Corcoran repTiedthat that was sonpthing that could be settl6d between the landlord and the tenants.
Pglgyqn was opposed to the request, because'it totally closed off the operi'ingi uetween
?|i]d]ngs: Tlrovl rep'lied that as one approaches the building, one's altentionls drawn to the shapes. One sees the concrete wa1 l, cars, and trash.
liggr^moved. and Morgan seconded to approve the request as per the staff memo dated7!20/82 with the condition.that the iirplicant will'not rem6nstrate against a specialdevelopment district if and when one ii tormeO for Vail Lionshead. The vote wis2 in favor, and 4 against. The motion failed.
Trout moved and Morgan seconded to approve in concept the request for presentation
Do tne Deslgn. Revtew uoard and then indrcate to the Design Review Boari severalconcerns of the PEC.
corcoran replied that it was not in the realm of the ptc to suggest specific
g=i91-.cha1-Ses-,Patten.Sgreed and pointed out that the PEC hao-to act on tne specrficproposal' ano that it.there were any significant changes, the applicant had to re-aPPlJr and that also the applicant iou'li ask to have ine'requeit'tabted. t,tiiio'agreed with Patten.
The vote was l-5 a".9@g1_with Trout in.favor.
Li "--?,rid*
c'-4- 7/26/82
added that although the
Design Guide Plan, they
Ray Story exp1ained that
per and Viele stated that
to further enclosingHili Street, since it was already small and narrow.rcoran stated that he was
5. Reques! fgr exteriqlgllqLation and modification in CCI District in_ order to
s
Peter Jamar went over the memo with the corrunission, and
applicant wasn't doing anything encouraged in the Urban
were also not doing anything against it.
The use of the room on the west side was discussed, andit ttould ho'ld a table for lunches for the employees. Ithey saw no problem with the proposal . Donovan objecpG
Brad Henry, manager of Christy Sports, stated lhat he was not creating an obstacle.
Corcoran replied that the addition further ctqted down the space on Hill StreetLorcor.ln rePtreq Enaf, Ene aqqlElon TurEner ctgseo oohln Tne space on nlil 5lreef,until it would become unattractive to walk tLfu. He added tirat the owner of the
Plaza Lodge building had stressed in previoy's applications that this was a very
Dusy street. Story replied that the Urban/Design Guide Plan points out that the
glnJglt-l'ike effect c_ould contribute to thy'streetscape in certairi areas and thatit fras not necessarily negttive.
Prper moved and Trout seconded to app
7/20/82. The vote was 4 to 2 with Co
passed.
always opposed to enclos'ing decks. He added that'in 6 or 7 times with small changes, and wished to
agreed, but added that the lessee would contineuntil the owner finds it economically feasible
Jim Sayre explained the request
Drager, representing the applicato use a bubble they aiready c
Now they wanted to change thei
6 Plaza Lodge Building had come
e one overall plan. Story
' propose changes indefinitely
comply.
the appl ication per the staff memo dated
The measureran and Donovan against.
wi nter
cant:ge Properties
ald the two sets of conditional use criteria. Ed
stated that originally the applicant had plannedin lta1y, then found that that was not feasible.
app'i ication to have a bubble over all of the pool
nt, Drager asked to have the application tabled until
ed to table till August 9 at the applicant's request.of tab'ling.
6.R t for condrtional use t in or:der to construct a tempora
me enc osure over
Es kwi th
stated
Patten
m0re
the
questioned whether applicant was asking to amend the application. Sayrethat he would like to
agreed and added that
6ee the app'lication be resubrnitted with che charrges.
the staff had studied the application from the stand-point that the bubble wouid Iy extend half way over the poo'l in reviewing rheviews from public spaces.ny of the menrbers felt the same way, and after muchdiscussion of this po
August 9', 1982 meetinq
Morgan moved,
The vote was
Trout s
6-0 in fav
PEc - 7/26/82
lequest,for gmEndments_to the municipal code section 17.40.075 condominium
Conversion--Lodqe and Accommodation Units to clarify wordinq and to reflect
7.
enn es ]n tne
on lv un
a
on District to ma clear that
ES w
cant:
asked for input. Jay Peterson felt that
the
about
s the PA district. Viele feltith pointed out that it brought
tchen
stri c
Eskwith described the changes, and
CCI and CCII should be treated the
ordinance was an over reaction, and
because of statutary request. Pa
need for a comprehensive revision.
more changes and get more 'i nput and sked to table the item until August 9.
Trout moved and Morgan
the August 9 meeting.
The meet'ing was adjourned at 6.i55 pm.
explained that the staff felt the
kwith mentioned that he wanted to make
seconded
The vo
d table the amendment recommendation until
was 6-0 in favor of tabling.
o
1:30 pm Site Inspections: Ipanema, Christy's, Lion's Pride
3:00 pm
1. Appr6val .of minutes of meeting of July 12, 1982.
Z, Request for approval of conversion of l9 aparUnents at the Inn at l'lest Vai'l.
Applicant: Jiines Barry Craddock, d/b/a Craddock Development Company
PLANNING AND ENVIRONMENTAL COMMISSION
July 26, 1982
modification in
the Lions Pride Appl icant:
Steve Sheridan
6.
5.
7.
Request for exterior a'l teration and I District in order to
for Christy Sports jn the Plaza Lodge
Request for conditional use permit in order to construct a temporary winter
time enclosure over one-half'of the Lodge at Vail swimming pool .
Applicant: Lodge Properties, Inc.
Request for amendments to the municipal code sectjon l7'40.075
Coridominium Conversion--Lodge and Accommodation Units to clari.fy wording and
to ref'tect the origina1 int6nt of the ordinance. Also an amedment to section
18.22.020 Permittei Uses in the Public Accommodation District to make it clear
that only units without kitchen fac'ilities (i.e. accommodation units) will be
allowed in the PA District. Applicant: Town of Vail
3. Request for approval for conversion to t'ime-she for Ipanema Condominiums.
App'licant: Daymer Corporat'ion
CCI I D'is
Building.
ct in order4. Request for exterior alteration 9nto expand the first floor shoPs (in
remodel. the second floor office space
Building. App'l icant: Christy Sports
Published in the Vail Trail iuly 23, 1982
I,IErcRANDUM
T0: Planning and Environrcntal Cormission
FRSI: Comunity Developrcnt Department
DATE: Ju'ly 20, .|982
SUBJECT: Application for exterior modifications for the Lion's Pride Building
in'Cocunercial Core II. Applicant: Steve Sheridan
DESCRIPTION OF PROPOSED PROJECT:
The project is to remodel the facades of the ground level retail stores in the
Lionr',s Pride Building. Three stores, Perfonnance Ski, Charlie's T-Shirts' and
Vall lilountaineering,-are increasing their enc'losed floor space by moving their
store facades out i few feet towards Lion's Pride Court. Charlie's T-Shirts
and Vail Mountaineering are moving their store fronts out about six feet' and
Performance Ski is moving out approx'imately 18 feet.
I. SUBAREA CONCEPTS
The Llon's Pride court is mentioned in the sub-area concepts:
Court opened to free access to Lionshead Court. Planting area
ruduced, relocated to about Lionshead Arcade Building to
provide screen buffer for restaurant and force traffic flow out
bf shadows into sunny area of court. Sculpture focal point
The key phrase here refers to the f'low of pedestrian traffic in relation to
shado,rs. The current store fronts are hidden away under the second floor balcony--
the store windows are often veiled by shadows. The renodeling would take the
stbre fronts at least part way out of the shadows.
II. UREAI{. DESIGN CONSIDERATIONS
l. Architectural Style
The Design Considerations state that the "challenge in Lionshead is to develop
vltality, visual interest and pedestrian sca'le within a contemporary archi-
tectural expression.
The project generally meets this contro'lling criterion. The design does
not pretend to be a foreign architectural style, it creats visual interestrith the awnings and materjals, and is oriented to the pedestrian.
2. The second design consideration encourages "a series of connected plazas...
occasionally linked by a mall... "
The application does not disrupt ttris pattern.
Lion's Pride -2-t o
3. The Guidelines also encourage 'fa sense of pedestrian scale...,l
The Lion's Pride remode'l will improve the pedestrian scale of Lion's pride
Court-by. bringing the store fronts out from under the balcony and improvingthe visibility of the store fronts.
4. The fourth criteria states that the service/delivery and parking corridorsin Lionshead should be preserved.
The application does not alter these items.
The remainder of the Lionshead Gufde Plan, under the title, "ArchitecturalGuidelines," will be addressed by the Design Review Board. These items includelnight and massing, roofs, facades, decks and patios, and accent elements.
The vail Lionshead urban_Design Guide p'lan does call for such first floorrenovations as outl ined in this project.
The
fee.
Tmn
fee
leaseholders in the first floor stores will
^This.fee shall. be paid before a building
-Council is in the process of reviewing tfrefor the cormercial cores.
The Department of conmunity Develgpment recorrnends approval of the project.The.remodel. will improve Lion's pi-ide court uv matiii irre'snops rnrevJslble and accessible to pedestrians-ana witi".improuE iiie imoiance otthe court by adding accent'elementi.
be required to pay a parking
pennit is issued. The
amount of the parking
luwn
r A -rJ//rno*lf+
office of the town manager
draft in the amountT. Lazier and
of tbe account, and
Yail, colorado 81657
{3031 476-5613
September 1, 1977 .
Mr. Mlke Loken
Bank of VailVail, Colorado
Re: Escrow Account Town of Vail-Robert T. Lazier
Dear Mike:
Tbis Is to authorize issuance of aof $2,343.1-3 to the order of Bobert
Lawrence Benway.
The $2,343.13 should be the balancethe account should be closed.
Sincerely,
TOWN OF VAIL
Stanley ?.Bernstein
Town Manager
l|ilI
S. Toughill
Admlnistraf,or
oo oo
cLn{raut)E
Town of Vail
FI.nCf,'RICAL PERMIT Job N
N9
Building Valuation
Electrical Valuation
Permit Fee
Inspection Fee
Total Fee
436
$......-..............---.-..
$.....{ 4..'.&-.........
s............................
r/
Appricant.....- *fr-r.^Zu {- -e*r.^*-
APPROVALS
.7:.(l:..7..7-
Dat€
Date Paid--..-..
Received By
THIS FORilI 13 TO BE POSTED ON
.tOB glTE DURIilG CONSTRUGTION
2I HOTJRSI ADVANCT, NOIICE
REQUIRED FOR INSPECTIONS
/t.d
rxa t. f. roaataL ao.. oairrt rrnaSt
DATE ,. , i,'.:11' , ' ,,' ' ,i JoB NAME
FIEOUEST
VAIL
tNstrEcrtau
TOWN O
TIME RECEIVED AM PM CALLER
E orxen , -,',''.)E panrrnl.LOCATION.
READY FOR INSPECTION
MON TUE WED THUR FRI AM PM
COMMENTS:
E appRovED
E upor,r rHE FoLLowrNG coRRECTToNS:
CORRECTIONS
d.orsappRovED ! nrrNsPEcr
DATE
INSPECTOiT
:;;;..x.':;:li.".i!;jn);iil;]oi,.r],t.:.],ar:.-,:::*r+ri,:*ir.jr;"r.rJ;.;utill,u";o;;*-
TNsFEETO*
WN OF'.)_
FIEOUEsiT
VAIL
DATE.
TIME RECEIVED CALLER
E orxrn E pnnrtlu LocATtoN
READY FOR INSPECTION
THUR ,^, // AM.,nMWED
Wiipp Rov E D
!-oeorrr rHE FoLLowrNG coRRECTIoNS:
CORRECTIONS
E orsnppRovED ! nerNSPEcr
:,
(-,
DATE
o tNSFEcrtau
TOWN OF
l\ 'r.i ',. ,'r
FIEBUEST
VAIL
JOB NAME
TIME RECEIVED- AM
E ornen
:.::.:
MON
COMMENTS:
FRITUE
n pnnrrau. LocATroN
READY FOR INSPECTION
WED THUR AM PM
fl npp RovE D E orsappRovED E nerNsPEcr
D upon THE FoLLowrNG coRRECTToNS:
INSPECTOR
!u!J,t ru..;;riiJ. ii-rg!!i',r,1-rr,i,;-'rii-;,*:i,i,uJ!r--.*ii;rr*.e.1*,.o-r;i.-
DATE
o rNsPECTIttu HEeUEST
/
oate''.'::-' -,ti','' -
"'/
JOB NAME ,,,
TIME RECEIVED- AM PM cauleh
E orxen I pannnu LocATroN
READY FOR INSPECTION
TUE FRI AM,PMMON
COMMENTS:
E nppRoy.Eo I orsneeRovED E nerNsPEcr
D upon rHE FoLLowrNG coRRECTToNS:
July 28,
box 100
vail. colorado 81657
1303) 476-s613
r976
l[r. Mike Loken
Bank of VaiL
Vail , Colorado
Ret Escrow Account held for
Town of Vail Jointly
'Dear Mi.ke:
office of the town manag€r
Robert T. Lazier and the
You are hereby authorized to release $I,111.19 to Robert T.
Lazier in accordance with Section 6 of Agreement . dated
November 4, 1974 and to close the subject account.
Sincerely,
DEPARTTIXNT OF FINANCE
Stanley F. Bernstein
Director Zoning Administrator
cc: BiIl Pyka
hwn r ||al
box 100
vail, colorado 81657
(3031 476-5613
July 28, 1976
office of the town manager
AGREEMENT
The release of $4,570.06 ($1,111.19 of which is in escrow
account held jointly by Robert T. Lazier and Town of Vail)
is conditioned upon the following:
1. Evergreen trees shal1 be planted no later than
September 1, 1976 as outlined on site plan dated
July 28, 1,976. Trees sha1l be inspected by TOV prior to
planting.
2. Evergreen trees shall be of the species and sizes
as indicated on the July 28, 1976 plan, and shall
be healthy nursery stock which have been balled and
burlaped and guaranteed for a two-year period.
3. The release of the final $2,593.13 remaining in the
account as of this date sha1l be released only after
specified evergreens have been planted and inspected.
lo.
AGREEMENT
THIS AGREEIIEL{T made and entered into in Vail, Colorado,
on the 4th day of llovember, 1974, by and between the TOI|N OF VAIL,
Colorado, a rnunicipal corporation, and ROBERT T, LAZIER of Vail,
CoLorado;
WITNESSETHI
ITIIEREAS, the purpose of thls agreement is to set forth
a procedure to guarantee that the proposed landscaping and plaza
to be located on Lot 3 and Parcel C, Block 1, Vail Lionshead Flrst
Fl1lng, Valt, Colorado, wilt be completed in compLiance with plans
by Dana Bickli dated tbe llth da.y of September, 1974;
NOW, THEREFORE, the partles hereby agree as follows:
(1) ?hat an escrow' account will be opened at tbe Bank
of Vail of Vall, Colorado, in tbe names of the Town of Vail,
Colorado and Robert T, Laziet on or before .the issuance of a
bullding perrnit for the bullding to be constructed on the afore-
said land,
(2) That the escrow account sha1I be opened witb funds
provlded entlrely by Rabert T, Lazier in the amount of $5,000;
C.3) that said $5f000 will constitute a guarantee that
the speclfled landscaping and plaza will be completed in a nanner
acceptable to the 'fown of Yail, Colorado,
(4) That approval for tbe conpletion of sald landscaping
and plaza sbal1 be obtalned fron the Design Bevlew Board of the
Town of Yall, Colorado;
CS) That tbe landscaping and plaza shall be completed
in accordance wlth tbe following schedule;
(a) A11 coucrete for stairs ard plaza shall be
ln place before the lssuance cf a Certiflcate of
' Occupancy;
(b) A11 landscaping shall be complete witbiD six
noqtbs after the date of issuance of the Certlficate
oi ociupancy;
<oJrnat in the course of construfg said lmprovements,
Robert T. Lazier may submit cost estimates for work completed
under this agreenent, after obtaining written approvaL fron the
Tovn of Vaii, Cotorado, may withdraw tbe agreed amount from the
escrow account ;
(7 ) That in the event the aforesaid work is not completed
iD a satisfactory maDner and approval obtained as provided herein,
$5,0O0 or the balance tbereof remalning ln the escrow account
shall become tbe sole property of the Town.of Vai1, Colorado free
of any claim, lien or encumbrance by Robert T. Lazier or any other
party, for the purpose of completing said work ln a satlsfactory
manner;
(8) That upon completion of the aforesaid work iD a
nanner satisfactory to the Town of Vail , Colorado, as outllned
above, and witbin twenty days after approval by the Design Beview
Board and the Town of Vail, Colorado, the Town sha11 cause Robert T.
LazLet to become sole possessor of the balance in the escrow account;
(9) That in the event Robert T. Lazler fails to complete
the landscaping and plaza and the Town of .Vail, Colorado completes
saLd work, all expenditures, lucludlng reasonable legal fees,,
shall be deducted from the escrow account and the balance, if any,
then remalning ln said account sball be returned to Robert T.
Lazler.
IN TITNESS $IIEREOF, the .parties hereto have executed
' thj.s Agreement on the date first above written.
TOSN OF VAIL
ATTEST;
Terrell J. Minger
Town Manager
Town Cterk
Robert T. Lazj-erSubscribed and dworn to before methis 4th day of November, 1974t
:'.
By
Notary Pubtic
MEIlORANDUM
TO:TOI{N COUNC IL
FR0M: TOfiN STAFF
RE:LAZIER PARKING VARIANCE
Thc Town st6ff rlshoc to dlsagrcc rlth the flndlnga ol tho Plan-
nlng Conmlgglon on the subJeci ysrlance for the follorlng reasons:
t. !{e fscl that grantlng thls type of varlance.wosk€ns ths entlre
requlrinont for Parklng rlthln ths bul ldlng' tn our vler
thcre lg no tcgai Justitlcatlon for grantlng the varlancc.
2. The grontlng of the varianco would bc c grant of spoclal -,, prtvitcgc tn ttrat the parkthg can bc put wlthln the bul ldlng
and other Uul iOings "titrtn t[e-6mnorctal Core 2 dlrtrlct
havo provtOea ct iiast a porllon (ln most casee morc thon 50I)
ofthcrcguIrrdPakkIngbeneaththobuIldIngalthoughthcy. ncre bul lt befOrl thts w6s a zonlng requlremonf (Vantage Polnt,
Llonghord Centre, Treetops, Sunblrd Lodge, Montanerol l'
pcstrlnds and tcnOnrrXl.' in fact, thc Vl llage Centcr vcrlancc'
,ii ippi.vod-eiprersty tor fho purpose of romovlng surfrct
parklng from Publlc vlsv
nar practlcc I dl f| | cultY or un-
p lf tho varlance 1610nrt grontcd.
that we cln flnd ls an eeonomlc
consldored In grantlng a varloncl .
4, Thc Plannlng Commlrslon felt fhat a preccdent had bcen s€t on
Lloncquare frorth varlancc for porklng lot.!lthln fho bul ldlng'
is tcdl that the elrcumstancos aro mucn dlfflrenf becaugc thc
rubJect sprcos tre hot vlrlblo (earfh covered) and aro undgr-
gr g;;;;;. itte varlancc alto illored the bul ldlng to be of a' iotor icale ond Preservcd vlews.
5. TheY .olso found thot there
n€c.t95rY PhYrlcel hardshl
Thc only phYslccl hardshlP
htrdshlP vhlch noY not be
t_J
box 100
vail, colorado 81657
1303) 476-5613
(-/
office of the town manager
July 17, 1975
CERTIFfED I'IAIL
RETURN RECEIPT REQUESTED
Mr. Robert T. Lazier
P.0. Box 627Vail, Colorado 81657
Re: Completion of Lionshead 0ffice Building
Dear Bob:
Your request for a 60-day t'ime extension for completion of covered
parking, as required by the variance granted by the Town Council on
September 4, 1974, was denied byl,the Planning Connission on July 'l 0,
1975 and by the Town Council on Ju'ly 15, 1975.
0n February 26, 1975 the Town of Vail wrote you a certified letter
stating that a number of items, inc'luding the covered parking, were
to be completed no later than March 28, 1975 or the building would
be vacated since it was illegally occupied without benefit of a Cert-
ificate of 0ccupancy.
0n March 31 , 1975 you again requested a time extension until July 15,
1975 for completion of the covered parking, which was granted by the
Department of Community Development.
We feel that every consideration has been extended to al'low you ample
time for construction during favorable weather conditions, and it has
become evident that further time extensions will not solve the prob'l em.
Therefore, a sunrnons will be issued beginning today' with each day a
separate offense unti'l such time as the covered parking and other items
listed in the February 26,'1975 letter are completed or some other re-
solution reached.
I
Mr. Robert Lazier
July '17, 1975
Page Trc
The tenants of the building are being notified, by certified copy of thisletter, that the building will be vacated in accordance with Section
306 of the Uniform Building Code if all conditions are not met by 12:00 PM
on August 31, 1975.
Si ncerely,
JADIJ K
enclosures:copy of February 26, 1975 letter
copy of March 3.|, 1975 agreement
cc:
(l )(2)
I
2
3
4
5
6
7
McLaughlin & Peterson
llord Hus
Cal ico Corner
Vail lllountaineeri ng
Charlie's Shirt4q
llal I /ilcilahan'
Hey Colorado
TOIdN oF vArL n
mjlo
ohn A. Dobson
luun
box 100
Yail, colorado 81657
(3031 476-5613
March 3l, 1975
office of the town manager
T0 llH0l,l IT l,lAY C0NCERN:
I hereby agree to complete covered parking as specifred as part
of the variance permit granted by the Tom Counci'|. Subiect
covered parking wlll be completed no later than July 15, 1975.
A permanent Certificate of Occupancy will not be granted untilall terms of the agreement are met.
ltffl
vail, colorado 81657
1303) 476-5613
office of the town manager
FebruarY 26, 1975
CERTIFiED MAIL
NTIUNN RECEIPT REQUESTED
l'lr. Robert Lazier
P.0. Box 627
Vail, Co'lorado 8l 657
Dear Mr. Lazier:
Thefo.|.|owingisabrjefoutlineofthecondit.ionsofyour.Commercial
Building,being consirrit"a: in Lionsheaa'ii 1'ey concein the Department
"i'i.i,tii,iiv 6eve'topm-nt within the Town of vail'
A. TemporarY occuPancY has
occirpied bY "Nord llaus"
been authorized for the spaces cument'ly
and 'VaiI Mounta'i neering"'
'1 . Said occupancy is based-upon the understandinq that
construction-iuouia-iontinire at a reasonable rate and
by this aate iiie-sii"iv ivste*s would be installed'
B. 0ther spaces in the aforesaid building are being occup'ied
without Perm'ission.
1. The .|973 Edition of the Uniform-Building Code'1{on!ea
by .referenc."uv"tn. i;;"-;i vai I , . clearly_forb'ids publ ic
o"..rpun"V of t-nis building prior to issuance ot a' Certificatu oi"o..ilpitlv"isittion 306 (a)' UBC 1973)
C. A drywa'l 'l (sheetrock) inspection was never made to ascertain
fire resistance qriiiti"i' of the construction' especia'lly
as 'it affects th;";i;;i-cotumns at tlre lowest leve'l'
D. The presence of a wood structure of this nature jn an urban
area which remafns without sheetrock and fire system-pro-
tection provioes"i ;;il;;;"; ;onoition in the view of pub'lic
safetY.
Robert. Lazier
FebruarY 26' 1975
Page Two
E. It appears that the new'ly-constructed concrete stairs
leading tioi"int"pititidtevei to the plaza level and the
plaza area Jo-not'have ieat.i ng as requ'i red'
F. Portions of the desien of the build'i"s llg-lllYi: "f
materials have been altered trom plani originally approved
bv the ottiit"ntuit"-soita' Ttre. des'isn :f^1li-:lt'ctures
inc'lud'ing eittlltt-ii"ishes.t'rithin theTovtn of va'll are
subiect to"?i*ii appioval by the Design Review Board'
G. Water/sewer tap fees have not been paidalthougha great
deal of cooperation *u' p'ouiauJ-uy'tne vail water and
Sanitation bistrict in conneciing ihe:ului:9 prior to
the November 15, 1974 dealtt:' ilg l'.!"? 1l9"lesulat'ions
of the v"ii'wiii"'ina sanitation District provide that
tap fees';;ti-;; paid prior to connect'ion'
H. Covered parking as required by the Town Counci]- 'as a condition for
granting a park'i ng variance hit-not been constructed as requlreo
Prior to occuPancY'
I. A large antount of construction debri s exists on and
aroundthesiteprovidingbothanunsightlyconditionan0
a deterent to Public safetY'
J. No contact has been initiated b{-{9u t:sii9i!1^:onstruction
of a centra'l trash disposal iutiiilV as t'equired by the
Design nevie*-boiid foi^ approuii of-you" construction'
K. Park'i ng structure must be^plowed in accordance with Article l4'
of the ziiiis"oi"ii"iti"'-oi^oininc" ruo' 8' series of 1e73'
l.ljthin five (5) days of receipt of this written notice'-I order that you
cease occupations oi iommercihl areas noi'iiuli:..-Uy i-f*porarv Certificate
of Occupancy. ruitu'!"io'titpiv-*iit' tnis-notice slral'l result in a
summons; the pena'lt'v for non-compl ial:: ;; o'iiitta 'in Section 205 of
the uniform Build.irg ioa" irp-to'90 ouvr'ini"iioo-iin" for.each violation
per day). Furtherm;"g,-; iil" iv't"* ;ititittloiv to'the'chief of the
Va'il Fire Protectron oisttict must be itiiiii"o immed'iately and other
deficiencie, .o"r..i"i ;iihi; 30 davs oi:"ii'" tntire structure will be
ordered vacated'
S'i ncerel Y '
DEPARTMENT OF
llilliam
Acti ng
l,lP/i k
Zoning Administrator Building
TO:
FR0l"1r
REr
DATE:
ME MORAN D UM
TERRY I/ INGER
J I14 LAI'4ONT
LAZ IER L IONSHiAD PROJ EC'I - REOUEST FOR VAR IANCE
SEfTEMBER 3, I91L
I
It is j-he view of the Community Development staff fhat the requestfor va r i ance by Robe rf T. Lazier for eight par:iing sDaces req u i redto be wil'hin the building to be located adjacent to the existingparking structure shcu ld not be granted based upon the app licantf s
arguments f or the f ollowing reasons:
Article l4 (0ff-street parking arrd loading) - Section 14.100
of the zoning ordinance statesrrln certain districts (which
applies to this project) all or a portion of the parking spaces
Prescribed by th is article are required to be within the ma in
building in order to avoid or to minimize the adverse visual
i mpact of large concentrations of exposed pa rk ing and ofseparafe garage or carport structuresrt.
There can be little doubt that the existing condition of thissite obv ious ly has an adverse visual impact. Further, in ourj u dgmen t, the p roposed sepa rafe ca rpo rt structure vtou ld not
lessen the adverse visual inpact
The argument has been advanced, fh o ugh not f rrmally, fhat a
precedent vras set w ith the approva I of a similar va r iance
req uesf for the L ionSq ua re North p roject. I t shou I d be notedthat th is variance vtas permitted to preserve views from the
Montaneros project by allorving the proposed building to be ofa lower profi le. Second ly, extreme care was taken fo requirethat the enc losed paiking was substantia I ly underground andnot viewable from principal view corridors. Consequently,fhe visual impact of this variance was of more benefit to the
surrounding neighborhood than if the variance had not been
pe rmi tted.
Article 14, Section 14.400 (0ff-street and Joint Parking Facilities)
states that "authority to permit off-site or joint parking
f acilities shall no* extend to parking spaces required by this
ordinance to be located within the main building on fhe sitebut may extent to parking spaces permitted to be unenclosed.
Clearly, the intenl of the zoning ordinance demonstratesihat the Lazier proposa I is not permitted. Further, given theexplicit language of this section, it concerns us ihat a vari-
ance granted in direct opposition to this provision would
seriously undermine fhe legal stability of the rrEnclosedrr
Parking requirement, particularly in CCZ.
It must be noted that a simi lar legal q uagm i re was created in
CCI using the same presentation technique that is being used
2.
Page 2
September 3, 1974
for the LionsHead project. We feel if is essential that the
Concil understand the fundamental nature of the proiect.Once
the underground or enc losed pa rk ing concept is comp rom i se d,
It opens up unlimi-l-ed possibilities for other existing sites
to request variances. This would in essence allow existing
underground or covered parking to be conve rte d to othe r uses.
Secondly, as rlas pointed out in the CCI staff memo, there are
obvious visual benefits accruing to the community by removing'the a utomob i le for surface parking a reas . Further, that under-
ground park i ng shcu ld be treated as a non-renewab le resource--
once gone,t is virfually impossible to rep I ace . Surface
parking can more easily be adj usted accord i ng to dema n d and
surface aspha lt can easily be t u rned i nto landscaped a rea
should the parking demand diminish,
Article l9 (Variance section 19.600 - Criteria and Findings) -
A copy of criteria and findings is attached. The Lazier project
does not, in our opinion, meef any of the f ind ings set forth
in this section for the following reasons:
be granted only if there is an trunnecessarya. A variance canphysical hardship"to the staf f thatthe n.ain building.the main building
footage th us creat
for a variance.
. Counse I for the aPP I icant
parking could be phys ica I lY I
I t is obv ious that locat i no
would diminish the available
has stated
ocated w ith inparking within
comme rc i a I sq ua re
ch is not groundsing an econom i c hardsh iP ' whi
b. The app licant has not demonstrated any "exceptiona I or
extraordinary circumstances or conditions app licab le to the
sitert. The very fact that he can physically locate the parking
w ith in the ma in bui lding and l-hat he owns the si-te on wh ich the
parking must occur and that grades ' access points, aisie widths,
setbacks, etc. all meet zoning standards, point out that th're are
not except iona I or unique c ircumstances.
c. At no time has the applicant demonstrated that not granting
this variance would deprive him of rights enjoyed by other
property owners in the same districi. On the contrary, great
Dains have been taken to insure fhat this area meets the pro-
vision of this ordinance, For example, LionSquare Lodge,
Antlers, Treefops, Vantage Point, LionsHead Centre, Sunbird
Lodge, Montaneros | , Westwinds and Landmark have provided at
least a portion (in most cases more than 50{ ) of the required
parking beneath the building a lfhough they we re bui lt before
th is was a requi rement of zon
vari ance was approved express
surf ace parki ng f rom public v
ng. In fact, the Village Cenire
y for the purpose of removing
ew.
SUMMARY:
Th ls project presents a pa
l. The addiiion of a new
the visua I appearance
rticular dilemma in that:
building will in all likelyhood improve
of the area given proper design controls.
Page 5
September 3, 1974
2. lf a strong case cannot be presented by the developer that hisrequest for a variance from the enclosed parking requirementis totally unique, then a potentially damaging precedent
could be established.
Therefore, we suggest that the deve loper be required to present
his argument in terms of his projectrs complete uniqueness fromother projects in the same zone district. This must be done so thata clear distinction is established so that other developers cannof
use this va r ia nce as a precedent. Failing to ach ieve this d ist inction
rve recommend that a completely enclosed garage be attached to theproposed building on fhe west side. This would bring the project
into compliance with the zoning ordinance and allow for the necessary
commercial square footage to be constructed. A second alternativewould be to require that the parking be provided within the buildingwhich is feasible, but wou ld signif icantly red uce the commercial
square footage
Th is project raises bas ic questions that, i n our vi ew, requi re adetailed investigation by the Town Attorney. Caution should be
exercised to see that all legal requirements under the zonlng ordinanceare strictly adhered to.
\'y' i .4,: l:-' :
t. ,rpptir.rli<,r, {r,r a \..)ri arrrcc is :.ui,r it lci, t. llre Zoriin!: /.c.iii;;:r j:.,r
2, Lt'gJt ..aric1. i'Jl, li..t-.a,d al lc.jrti l5 rJa,.s p: ior to p!,blir- t.ear-;n:.
3. !tli,.'.i-rrr (,::rr.ii-. i()n_ 9!.i, t I hold i, pu:;tic lica,rirg r,ithin l0 d.ryso! ?i't doic ol .a: a. p I i (. o t i o !r .
4. l'ler'r'lri.: Cr,r:" iss roa ntst r.rJir, .r ,Jc!-ision rji:hin Z0 da),s of .il:c
Clogil.i: o:' ]u'rtic hcerinq. Irlannirr,: Cc:-r^i::- iOri tllay era,rovc..icny ?r !;:L r'(.re '.rpcr' aond;!ion or rs./ issur) l<rr a iin,itcJ poricoOl ti'ie C!- .:ay be rCyOa.lb le.
5. iJi itrin' 'l .da,;: lol lowin.; action by the irtanninq Co,.,",issicn thcdccision. :ii'"it.r trc irons:riiticd to thc aFpricari anc ihc Toriri cour,c; l.
Thc Tor.;n Cor,lnc i I s-\all conf irn, :roJi{y cr rcver3e thc decisicnol ilre Pl.-.rrnir,o Conr.:ission ?, 1 thp nexi regular nectinS.-- -
Thc Zonirrg Ar.ln,i ni s1-rator shal I i.-, ro u Variance pornit.
6.
7,
Grlleria and f indings:
l' The relaticrship of iho rcquested veriancc ro orher existing orpolcntial uses and gl rucl.urcs in l.hc viciniiy2.. The deg;rec to which rcliei {ron flre strici.-oi liieral. Inrerpreii:-'l iorr and enfo..9T9li ot a speciticd rer:.u tat.i on ir-noi"i..ry t"achieve cor,.!aii.biliiy jrrd unifor-nily oi'trcatn.ni anolg s:iesi 1 . I h u . v i c I n i t y , or to atta i n i.he objecii ves ol th is oiOinance_ ..vl*hout gran.f of speciat privilege,f. The cf fccl.oi tho requested variince o^ light aod air, distrilrution.9f ?uptrlaiion, transr,crtaticn and trai{ic i
" c i i i i i o * , ' t i, f i .' {aci lities and utillties and .putr I ic sa:eiyl . ' . :4. suqh othcr f rcr-o.s. and .critenia as rhe con;issioo decns appr"i cab:b..r to 1'he proposed.va.risncc
The Planning Connission shat I mako th€ fol lohling findlngs beforegrant j ng a variancc 2
l. That Jhe granting of the variance hill not cons.t ituie a granf' of speciar priviiege inconsisten? with tic. Iir:ri.:.ations oi otho.- properl ics cla5silieJ in the sar,e d.ls..i.rict'.2. That ftre grani in-o of- thc var iance w i i t . nct .be detr ine nta.r rc. Jho pubtic heat.th, sircty, or r^,€l?are,.or "utuii"ili-inJ"ri""-.. lo properties or i;rproveneats in the "rctnrry.3. Thal tlre vnrianco is ,,ra!-rantcd for one or r,1ore o{ the followingreoscns:
a. The strict or I iteral inl.erpre+aticn and enforcenenl oi th6speci{ied reouraiion rr'ou rd resuri in practi.ar ciiiicurlyOr unnsCe: sa ry phys ice I hards:iip i ncons istent with theob jec.l i vcs of .i h i s ord inancc .b. Thcre are exceptional or exi.raorCinary ci rcumstances cr' conditions aprticebre 'tc ihe site ot itrc v6rion." ir,"t .o!9f "f ply gel,er-.rllV ro ciher prot'ertics in the sa|::e :one.c. The sirict or lileral interpretciisrr anC e.;o.ce.,eit-"r tt,.s?ecificd recuiaiion rjcutC Cetrive 1ne ao.olica,it. oi privileg:scnjoyed by ihe or'r^ers of .ofhcr properl.iss in the sanc d;;;;i;;.
cosr oR riicgir';€I I er;cE ro rHE lpFL iCi:i; of sr!.:ic:. cR L I TE;i.iL cci.iFLrr-ri:ciw l1'ii A RE:;ULAT loil sHALt r'tor EE A Ri,\scil t'c11 cRAilr I r:6 A vr.R I ilJci ,
I
I
I
I'
ti
x
n
i
TO:
FROM:
RE:
DATE:
MEMORANDUM
TOI,IN COUNCI L
PLANNING COI4MISSION
REQUEST BY ROBERT T. LAZIER FOR VARIANCE TO ALLOW
CO'ERED PARKING NOT I,IITHIN A STRUCTURE PARCEL C'
VAIL LIONSHEAD FIRST FILING
AUGUST 20, L974
At their meeting on August 15, L974, the Planning commissi.on reviewed
l-r.qJurf UV noUert f.-liii""'tnat he be allowed-to put additional covered
pa"ting spaies into a structure attached to the present park'i ng structure
if'tat ii adiacent to the Lift House and Lazjer Lionshead Arcade Building'
itre varianie is for covered parking not within the building, as required
by Section 9.610.
Mr. Lazi er and his attorney' Jay Peterson, argued that (1) a precedent
nas itready been set in t-hit pirt<ing variances have been given 'i n CC1 'ira iZl-if.,"ut u precedent has been s6t in that Lionsquai"e iior'"h i;as given
a variance for parking not within the bujlding.
The Conntission found, in accordance with section 19.600 of the zoning
ord i nance :
(1) That the granting of the variance wi'll not constitute a grant of
speCiat piivileg6 inconsistent with the lirnitations on other
pioperties classified in the same district.
(2) That the granting of the variance will not be detrimental to the
public heiltn, sifety, or we1fare, or materially iniurious to
iroperties or improvements in the vicinity.
(3) That the variance is v*arranted because:
(a) The strict or literal 'i nterpretation and enforcement of the
specified regulation would result in practica].difficulty or
unnecessary-itrysical hardship inconsjstent rvith the obiectives
of this ordinance
By a vote of 5 forl 1 abstention, Hanlon; Pierce absenti the variance
request was granted.
l4r. Lazier was informed the following conditions must be met: -(1) he
muit oOtain design approval of the additjon to the covered. parking;(ij ni musi Urin6 lahiscaping up to standard, as required-by the zonlng
diiinince; ana (5) his ociupincy permit would be revoked if the land.
scaping were not brought up to standard.
LAPINITm
o
I'IEMORA|IDUM
T0: Gene A. Srnith
FR0lil: Oiana Toughi'l I
DATE: August I, 1975
RE: Arraignment of Robert T. Lazier
Building Code and Zoning 0rdinance Violation
0n July 31, 1975 I represented the Town at Lazier's ,
' arraignment. He entered a plea of "not guilty,,and a hearing date
was set for September ll, 1975 at l'l:00 AM.
lJe should get together with Judge Gerard prior to the
hearing so that he has a surmary of the facts. I have a comprete
fi)e pertaining to this project which we can review at your con-
veni ence .
cc: (l),Terrell J. Minger(2) Town Council
MEMORANDUM
T0: Gene A. Smith
FROM: Diana Toughill
DATE: July 29, .|975
RE: Robert T. Lazier -- Surmons for Building Code and
Zoning Ordinance Violation
As you are aware, a summons was issued (a copy of which you
reviewed) to Robert T. Lazier for illegally occupying the Lionshead
commercial Building and failure to complete covered parking as required
by the parking variance. Amaignment has been set for July 31, .|975.
Because we have notified the tenants of the building, as well
as Lazier' that the building will be vacated on August 3'l , lg75 for failure
to comply' we want a hearing date set as pr:omptly as possible, preferably
before the August 3l deadline. Attached is a copy of the letter sent by
certified mail to a'l I tenants and Lazier.
Forcing Lazier to comprete projects has arways been a probrem,
and this is not the first time 1ega1 action has been necessary. we would
therefore recormend strong neasures to assure completion of the project
and as a deterent to similar problems in the future. The Town council has
forcefully expressed the desire to handle this case with dil.igence and vigor.
cc: Terrell J. Minger
GRAVEL.
CONCRETE
LABOR
.
TIAITS'(electrlcal. heat)
FOSTER I,UMBERstsel neeh2'l4'etude
NEW ELECTRICnaln t3oc€rB
panel
laboi
;
o
t{ovenbei 18' 1975
$93.10
*18oo,oro /
$45?0,06 '(totat)
Box 517 - Frisco, Colorado
Bob Lazier
Vailr Colorado 8165?
Ws-sincereli AOpreciatb Vour Continued Patronage.
E|TATEMENT ot ofs
- Mly We S€rvo You AgEin Soon?
-.'October 29' t9?5
Frisco, Colorado 80443
It f.id within 1O dry. Irom rhe drtg ol
thirStsr.ment - You mlv d€duct.. . .. . .
lf account is not pald wlthin 1 0 days, a FINANCE CHARGE on lhe unpaid balanae is compuled at
a periodic rate of 2% per month, which ls an ANNUAL PERCENTAGE RATE ot 24%. Also llen
f€es, legal fees, and all other collection charggs will be added to the unpaid balance du€.
Box 517 - Frisco, Colorado 80443
'i)i, irr1.i.)1'
'a:r. l-, I -r. ?'.i"(,4J
STTATEMENT ot of: i,,-ri;or,.'r' 1' L.-i.:
3?
ll account is not paid within 10 days, a FTNANCE CHARGE on lhe unpaid batance is computed at
a penodic rate of 2% per month, which is an ANNUAL PERCENTAGE RATE ot 24%. Also lien
fees, legal lees, and all other collection charges will be added to the lnpaid balanc€ du€.
,' ffi@UNTAIN Ur/r./t/tb. r,*.
80443 v_00 404L
VArL 476-519t
? BOX 5I7 FRISCO, COLORADO
LEADVILLE 486-2780
I
- -7s
IO DAYN' C.O,D.
CUSTOMER P.O NUMBER
MAIL
DEL'Y
ADDR
ADDRESS ( -! .(,
srffrKA cnourS.z.' a l'/1 ArtSILl?[tD
70 OF CALCIUM CHLORIDE
fl PozzoLrTH tr oTHER ADMIXTU RES
! HoT WATER E HEATED AGGREGATES
SUB TOTAL
SALES TAX
MINIMUM IOAD
DEI'Y CHARGE
MTNUTES @ l/ s V;
6?
ACCEPTED'
CUSTOMER INVOICE
' ffiOUNTAIN ("/'b,/4,tu. rru.
,Box 517 FRrsco, CoLoRADo 80443 V_00 4047
LEADVTLLE 486-2780 VAIL 476-5191
(
CUSTOMER P.O. NUMETR JOB NO.TERMS
ro oavrd c.o.o. !lD-/- 7r
SOLD TOr 7',1, ' L t
MAIt
DEI.'Y
ADDRESS:
ADDRESS:
UN T/REFERENCE
tif"tE cnout F'az'" ! |%' ATTSNTRANED
7o OF CALCIUM CHLORIDE
n pozzourx N oTHER ADMIXTURES
n Hor WATER f] HEATED AGGREGATES
SUB TOTAL
SALES TAX
MINIMUM LOAD
DEL'Y CHARGE
o" ., J.)
te
ACCEPTED.
*CUSTOMER INVOICE
- -(
TBoX 517 FRISco, CoLoRADo
LEADVILLE 486.2780
' ffi@UNTAIN (t/'b,/(ip. rne I80443 v_00 4L57
VArL 476-5191
- ,/ ('ro oav$€ c.o.o. E
YDS. f sflf3 cnou r/.r, AIR ENTRAINED
'. coNcRETE
9/o OF CALCIUM CHLORI DE
! pozzolrrn ! oTH ER ADMIXTURES
HOT WATER ! xterro AGGREGATES
SUB TOTAL
SALES TAX
MINIMUM LOAD
DEL'Y CHARGE
GATLONS OF
WATER ADDED
7',O
.t5 r/ i '. '')
lt,l l\*j\/
/,
ic )
rnu&r rrne
ACCEPTED.
CUSTOMER INVOICE
*r#Fct
u|Lo(rrmm Er667-6923
TO I DAY woRK
,i,aIr'
OATE COMPLETED
Work ordered by
pR|cE IAMOUN?I
fi,l"fffi ,Tilr,rjT^:1,r,x1,,:l*,:*_.rn ilo !rtt, lrD,F
fif ll,:,#.1 _1,: cj-,-"3i ir;;ffi il.il;,.,"1i1,;I?1,,,,
l;;,i1,3"T,*.1, rj.l:^:lLilt ffi;;;:,,;'ffi;lil;lTi.#
OTIIER CTIARGES
II hereby acknowl€dge the satislaclory
o4JJ
.o
=z
o
uJo
u-
UJ
z
ul
=G
o2
Eozoo
oz
o
utF
oF
FonJ
o
=rtl\--O
@o)cl:<
=z
z
o
I
F
ciz
ulo
lo
bg
E>oz
!>EZe{
ElI 3*frg o
EaH9;! J#il t,3Eoe
ef;E5F5o;
tlJ ,'J9
trt i
J
F: fi
EE-i E
gfi:f; H
luwn
Y
off ice of the town manager
October 22, 1975
box 100
vail, colorado 81657
(3031 476.5613
\
Mr. Robert T. Lazier i '
Box 627Vail, Colorado 81657
Dear Mr. Lazier:
As provided for in Section 203 of the Uniform Bui'lding Code, I wil'l
be forced to close down the second f1 oor portion of your new Lazier
Lionshead Cormercial Building if the stairs to the east end of the
ba'lcony/walkway are not properly replaced and a new lower landing
instal led.
Consider this letter a written notice that the work as mentioned
above must be completed within three (3) days as of today, Wednesday,
October 22, L975, or the above stated action will be taken by this
Department.
BBS: rjr
Si ncere
Bennett B. Strahan
Chief Building 0fficial
.*
_3 y . s-ftv7
'":: :.?'"1:,:n1:.^Do s1€!'7 / eaoxe,.of'.-""."
July 9r 1975
Its. Dlana loughlll' Secretarlr
Zoning Board
Towrr Offiees
YaiLr Col.orado 8L557
Dear Dianar
I an requestlng a 6O aay extension on the uovered
parklng requirenent-in the LionstreaVlift House 8!€6r
The reaeon for requesting this extension lE finan-
cial and allowe addltional tirne for constructlon.
ALL other requirenents that were requested such ast
landscapingr heated stalrcasee in the plaaa area-srd
covered-stiircases off, the parklng structurc wiLL be con-
pJ.eted on or about the requlred date of July 15.
Thank you for your consideratlon.
Rltrank
,4'11'
l#w
AGREEMENT
THIS AGREBI{ENT made and entered into in Vail, Colorado,
on the 4th day of November, 1974, by and between the TOWN OF VAIL,
Colorado, a munici-pal corporation, and ROBERT T, LAZIER of Vai1,
Colorado;
WITNESSETH:
WHEREAS, the purpose of this agreement is to set forth
a procedure to guarantee that the proposed landscaping and plaza
to be located on Lot 3 and Parcel C, Block I, Vail Lionshead First
Filing, Vail, Colorado, will be completed in compliance with plans
by Dana Rickli dated the l1th day of September, 7974;
NOIV, THEREFORE, the parties hereby agree as follorvs:
(1) That an escrow account will be opened at the Bank
of Vail of Vail , Colorado, in the names of the Town of Vail,
Colorado and Robert T. Lazier on or before the issuance of a
building permit for the building to be constructed on the afore-
said 1and,
(2) That the escro$/ account sha1l be opened with funds
provided entirely by Robert T, Lazier in the amount of $5,000;
(3) That said $5,000 will constitute a guarantee that
the specified landscaping and plaza will be cornpleted in a manner
acceptable to the Town of Vai1, Colorado.
and
Town
(4) .That approval for the completion of said landscaping
plaza shall be obtained from the Design Review Board of the
of Vai1, Colorado;
(5) That the landscaping and plaza shal1 be completed
in accordance with the following schedule:
(a) A11 concrete for stairs and plaza shall be
in place before the issuance of a Certificate of
Oecupancy;
(b) A11 landscaping shall be complete within six
months after the date of issuance of the Certificate
. ct ?ccupancy i
CERTIFIED COPY OF ORIGINAL
This js a brue. copy of the original
hereof which is in ny custody in the
records of the Town of Vajl ' Colorado.
own
(6) Ttrat in the course of constructing said improvements,
Robert T. Lazier may submit cost estimates for work completed
under this agreement, after obtaining written approval from the
Town of Vai1, Colorado, D&y wi-thdraw the agreed amount from the
escrow account;
(7> That in the event the aforesaid work is not completed
in a satisfactory manner and approval obtained as provided herein,
$5,000 or the balance thereof remai.ning in the escrow account
shall become the sole property of the Town of Vai1, Colorado free
of any claim, lien or encumbrance by Robert T. Lazier or any other
party, for the purpose of completing said work in a satisfactory
manner;
(8) That upon completion of the aforesaid work in a
manner satisfactory to the Town of Vail, Colorado, as outlined
above, and within twenty days after approval by the Design Review
Board and the Town of Vail, Colorado, the Town shall eause Robert T.
Laziet to become sole possessor of the balance in the escrow account;
(9) That in the event Robert T. Lazier fails to complete
tbe landscaping and plaza and the Town of Vail, Colorado completes
said work, aI1 expenditures, including reasonable lega1 fees,
sha11 be deducted from the escrow account and the balance, if any,
then remaining ln said account shall be returned to Robert T.
Lazier.
IN WITNESS WIIEREOF, tbe parties hereto have executed
this Agreement on the date first above written.
TOWN OF VAIL
ATTEST:
Subscribed and Sworn to before methis 4th day of November, L974t
Ter inger
nager
e5r:G r\.rv
'a te P; i .3
EGAL DESCR IPT IOII
sE zoilE acz ; ?R.P'SED usE(s) O*ta' 4Gtag&L -'
OT S IZE ; FROIITAGE.
---;
ETBACKS: P'equi red - ;'"^', 6i;' im'o(;3
Actual - Front
-,
Sides
-
' Rear __----;
rlSTAIfCE BETII:EiI BU; LD liiGS: Reoui red -
' Actua-l --:---';
lElGHr: Averase Grade -__._- Heisht Allowed \I/X(ae)-' Actua | 2L'b t
;.R.F,A ,;
-
Ratio, Allowable sq' {t'
'
t
' Actual sq' ft'.'.--..-;
:ot'il.iElic IAL FLooR AREA: Perceniage a I lowable!4/' Al lbvable sq' f t
Actual sq. fi.
rulLDtNc BULK coNTRoL: Allowable naxinum tengtn -!25:-', Diasona | 2261 -,
lengfh , Di agona I
Af lowab l" t?d 5,lowable Sq. ft. __-, Actua
Actua I sq. ft.
JSEA;LE gPEN sPAcE: Requi red ---A- sq' tt', Actual sq' f+"
Ground Le','el.---,
-$,
Conimon
-f;
LANDSCApf i.IG: iequired 2b 1, sq. fi., Actual i _---sq'it'
rARKll.lc AN.D LOADING: No. Requi red -----+, No' Actua | - r dovered ti:-
4rrrt rart 4 No'; Covered Actual .---
etu-tugrL
requl red orrturtPthdt , Actua
i tTE COVERAGE:
ZON ING APP RO VA L
I
AI
--.,
',1 +i 1": t )
DES I GN REVIEU B0ARD APPROVA !
0ate-
. DaieChai rman, Design Review Board
UTILITIES APPROVAL
ENV I RONI.IEi'ITAL I I.IPACT APPROVAL
Town Eng ineer
!,layo r Da;e
stia+
Date Submi tte d
Dale Subni tfed
Date Sub|;!i tte d
Extens-l on of
ng Rev iew
gn Revi ew
rontienta I
for Zon i
f or Des i
for Envi
Dead
Dead
ne Date
ne Date
li
ti
I rnpact Revie*
to
Deadline
as Ferii,i+iel
date
by Sect i on
c0t''tir!EllTS:
ot Ordi nance No. 8 (Series o{ t 97i)
ra
\prye t-t+ Cabrt*fia"u/b*^ W/u*M,UIC)'
-)tJo*l^*'n.(.W-lala*lheo te' (4-telt al)) -+ h+ %'
*fQ-, e(^*i.o
-21'+ bbl*E^J*'_Q +w n,
bkZt^d.v.,+L*.al
--+_?
4
-->
-
ili o
lll
A*W t-t+ Cah,r,
l::i'*tlt-,elat*e,o.
ill G€-Htala*+r,an
I
ll
4t'
4d
4',
fri4.tl
jz'
41'
L*W{+- C"u t+, -,.* / b*v*** b&.
\rWfrp\*f,'*,o,+3
kt'+h E:J^"bn
fu=b''|:,n 4l+ zt
ts-r w 1 ,| - | l. [tr I t .a
=tuM fi(*. Zt'
I_t tlabrdior->
nw,,:
box 100
vail, colorado 81657
1303) 476-5613
off ice of the town attorney "1
?o:
FROM:
DATE:
RE:
SUBJECT:
NOTE
Diana Toughill, Zoning Administrator
Gene A. Smith, Town AttorneY
r2-r3-L974
TOV/Robert T. Lazier Agreement of IL-4-I974
(1) Disposition of copies of Agreement(2) Conclusion of the Agreement
(1) 1. Attached hereto are two copies of the Agreement' one
of which has been certified by the Town C1erk.
2. Please transmit the certified copy to Mr. Robert T.
Lazier, giving to me.a copy of your letter to him.
3. Retain the other copy in the records of the Department
of Community Development.
4. The original copy of the Agreement will be retained in
the Administrative Office and rvi1l be available for your reference
if such is necessary. I am norv trying to keep all TOV contracts(original copies) in a central location so that their whereabouts
will be readily known.
(2) In due course please inform me as to the conslusion of this
Agreement, i.e. whether Mr. Lazier fulfilled the terms of the con-
tract or what other result occurred.
{rr-t
(6) That in the (:()tirse of constructing sai': ,! mprovements,
Roi,, r i ,. Lazier may submiL cost estimates for worJr ,',,'ritJ"eted
uldet Li. ,r agreement, af ter obtaining rvritten a1:i,i .,'."::1 from the
Town o{','a.il, Colorado, may withdraw the agreed:.:,,:-)unt from the
escro\f irccount,;
(7) That in the event the aforesaid rvork is not completed
in a satisfactory manner and approval obtained as provided herein,
$5,000 or the balance thereof remaining in the escrow account
sha11 become the sole property of the Town of Vail , Colorado free
of any claim, ]ien or encurnbrance by Robert T. Lazier or any other
party, for the purpose of completing said work in a satisfactory
manner;
(8) That upon completion of the aforesaj-d work in a
manner satisfactory to the Town of Vail, Colorado, as outlined
above, and within trventy days after approval by the Design Review
Board and the Town of Vail, Colorado, the Town shal1 cause Robert T.
Lazi-er to become sole possessor of the balance in the escrow account;
(9) That in the event Robert T. Lazier fails to complete
the landscaping and plaza and the Torvn of Vai1, Colorado completes
said work, all expenditures, including reasonable 1ega1 fees,
shall be deducted from the escrow acsount and the balance, if any,
then remaining ln said account shall be returned to Robert T.
LazLer,
IN WITNESS WHEREOF, the parties hereto have executed
this Agreement on the date first above written.
TOWN OF VAIL
ATTEST:
Subscribed and
this 4th day of
Sworn to
November
before
, I974
l!'ry Conlrnissicn cxpircs llovcmbe:'30, lg77 "
inger
Notary
Robert
L_
AGREEMENT
TIIIS AGBEEI\IENT made and entered into ln Vail , Colorado,
on tbe 4th day of November, 1974, by and between the TOWN OF VAIL,
Colorado, a municipal corporation, and ROBERT T, LAZIER of Vail,
Colorado;
WITNESSETH:
WHEBEAS, the purpose of this agreement is to set forth
a procedure to guarantee that the proposed landscaping and plaza.
to be located on Lot 3 and Parcel C, Block 1, Vail Lionshead First
Filing, Vai1, Colorado, will- be completed in compliance with plans
by Dana Rickli dated the llth day of September, 1974;
NOW, THEREFORE, the parties hereby agree as follows:
(1) That an escrow account will be opened at the Bank
of Vail of Vail , Colorado, in the names of the Town of Vai1,
Cotorado and Robert T, Lazj-er on or before the issuance of a
building permit for the building to be constructed on the afore-
said 1and.
(2) That the escrow account sha1l be opened wlth funds
provided entirely by Robert T, Lazi.er in the amount of $5'OOO;
(3) That said $5,O0O will constitute a guarantee that
the specified landscaping and plaza will be completed in a manner
acceptable to the Town of Vaj.l, Colorado.
(4) That approval for the completion of said landscaping
and plaza shall be obtained from the Design Review Board of the
Town of Vail, Colorado;
(5) That tbe landscaping and pLaza shal1 be completed
in accordance with the following schedule:
Ca) Al1 concrete for stairs and plaza shall be
in place before the issuance of a Certificate of
Occupancy;
(b) A11 landscaping shall be complete within six
months after the date of issuance of the Certificate
of Occupancy;
\
\\
co
E
;1
FI:l
EI'l
I
a
o
GEc
2
'z|lJ6k
I lll6.oo.(J
TT
gl
F
Ei
FI
!l
FI
F,a,
z
2
l.
o
li
lr
HzBo
l!(,zg
G
oFz!l
=ulv,
uJ
9F
G
||JE
GooJtt
tr,lE
t-oJ
J
FoF
ult
c
Jt!
J
FoF
r.
Hi
gs
J
oJ
-f
n
l-et
--G'F
uJ
IE
|l,1
ooz
G
4Ir
z
F
oo
2o
F
c
IJJ
F
z
ulJul
c
o
llt
lt
6ut
o-
at
anE
UT
Jv
=c.lu,
ulE
|l
(rl
a
zo
.Dt
6
lEr
>o
:Qul
=o
A9\:JO
zo
Fat c5laOFE.40
6:i:>6fufo.ott
; o,l
s"
$o
\
a,U'!Jcoo
=
i
F
!r
z
z
z
=J
olF
tr
z
Irl
z
z
&
E
a
F.
til
Irl
R
t
O
Fz
a
L1z;
t4
F
z
=
=c
UJ4
ql
ul
o(Jz
gJ
z
E
ItFz
u,l
=ulo
IJJ
9
G
IIJc
G
Jtt
trJ
FoJ
J
FoF
ql
ooJt|.
J
F
!
Erl!
o
(-...
4-(.)r<.
=
I
l-etu
-?=oElt._ -a--f
o
NO|lVn'rVn
z\
;r,
th
uJo
Gr
:--s
\/l o ('r
t-O *
LIJ
zo9t
z
9F9qd.6Fl(qo
=>
5S
G(J>uFO
;.i
$
\A
J\d
s\4.tj\pqg
-\
-.
!
t
t
-:,:a;e.j i
o rNsPE gffi*J=trJEs',
JOB NAME
/i
'TOWN OF VAIL
/ l.,t,,.i ) ,, //lCALLER
E ornen
MON
COMMENTS:
READY FOR INSPECTION .
E pnnnnu LOCATION
I FRI AM PM
El.sPp RovE D florseppRovED E nerNsPEcr
D uporrr rHE FoLLowrNG coRREGTToNS:
CORRECTIONS
DATE
INSPECTOR
.t uf y 17. '|914
f{oT I Ci: 0F PUBL lC iIEAR I t'lG
i'lOT lCt tS li€REaY GIVEi'l fhat Mr. Jay Petsrson' rspre-
sentlng Mr, Robert T. Lazlsr, has apPllod for a varlance
by Sect I on 9.6l0to o I low ncrn-cov€red Park insl as r€quired
of Ordlnancci No. 8 (Sories of 1973, In order to construct
a structure located on Parcel C, Vai
App licstlon has been made In accord
sa i d ord I nance.
LlonsHead Flrst Fl I Ing.
v t th Sectl on l9 .200 of
A publlc hearlng wi
21.400 of the zonlnE ord
ln the Vail Municloal tlu
b,sf orc, the Town of Va | | Ppe transn+Itted to the Tow
TOiJiI OF VA I L
Diana S. Toughl ll
Zonlng J Admlnlsf rofor
I tle he ld i n accordancs vJ I f h Sect I on
nance on Auglet B, 1974 at 3:00 P.m.
ldlng. Sald varlance wlll be heard
lann I ng Commlgsion and flndlnge rlll
n Counil I for the Tonn of Vaf |.
Al #';Lcffe,L/a-,,
t3n o
APPL ICAT ION FOR VAR IANCE
And/0r
COND IT IONAL USE PERM I T
0rd inance No. I (Series of l97l )
Applicatlon
Hearl ng 0afe
Da+e J u ly l1 , 1974 e"o tication Da+e July 19, 1974
August B, 1914 Hearl ng Fee
Augusl 20, 1974F1661 0eclsion date ,t:.
to*n Councl I
| (we) Robert T. Lazier
(Applicant)
Co loradow'
ot (Address)
Va i I 476-5510rnone(City)
do hereby request perrnission io appeai bgfore the Vai I Planning
Comnission to request the following:
x) Variance from Article 9 , Sectlon9.6l0
) Zon ing Change f rom-toX) Parking Variance See aDOVe
) Condltional Use Permit to allolr
cc2 Zone.in
For the f ollowing described property: Lot/trac+-, Block
Fttins Number Pa rce I C Vail L ionsHead First Filing
Clearly state purpose and inient of this appl;""11onThe pufpOse
508 of the required parking.within the proposed
buildinq. Applicant desires to provide parking in
the parking structure located approximatgly 30 feet
from the building.
I'lha+ do you feel is the basis for hardship in this case?-!@--
dimensions of the site and the location of the
existing buildinq make it impossible to provide
parking hrithin the buildinq. Sufficient parkinq
is to be suppl-ied within the e-isting parking
structure and adiacent pro
onature oiaoo I icant.- Petersori
rney for Applicant
\t-lgt
t-l
I
I
I
I
rl
tl
I
eoxo
5
:E
r\|
(t)
<
qt?t
{
"q
dE€
Ec)
a5
at)
o!!
frl
o
ttcd
E
!3A
B'rt
ct
E
,iiI
o
'Eca,
E
3
Blt,ct)
>
-)
Gtt
I
I
1
E
!
a!
EI
J
Po
6
g
o
B
ao
B
3E
ott€
EE.rE
EP6(D
S='or' 3
:ts
o)
I
E
tr
H
F
q)
.9
Et
o
c
!a
CL
FEEE!€eEgE E t3;Es3:irtT! : I.E
iiFrsff;*E ili! .e E';E,E:Esg & € ea siilFf$fir ?iE
€
I
d
F(|,
tr
tt
6
o
o o
,/'I(,L*Z*
1/a-4-?/.;
ZTeaJt
b;t- tt @ ze,f
J. Za o
6zd
f36
1ry'
?aa
J"7 +1.ra
,fji{4."o e
/ 7.f,.
do.f,
. 7O o ,/f r'/ ^ret
I@
?5 &*rZ @t
J?52
Ltzs-
72*f /
4?a
grd
?tzt @ ,8o - 41of,4 41f
= /r. td
f,fi aa
6s. ar
- ?r.zs-= ?/
/7 4"rr.zr' -/--, A4-'442r(
f /4 p^ 7--n--a- 7ta
*7 2,. .. = Af
A-ch'sl A-*,,-.,1 J7 + /?./u/.2.(A4=f?
ttJ
&zr--2,;
O O
-+--
,l
s?+ct s
w IlEc 5$e INsiPECOIclN
TOWN OF
FIEOUEsiT
VAIL
DATE JOB NAME ,,'-'/.*...4 r':::'/ ':;)'
TIME RECEIVED AM PM CALLER
E orxen ,.,t4:l -- E pnnrrnl
READY FOR INSPECTION
WED
LOCATION
FRI
A.*tp RovED E otsnppRovED E nerNsPEcr
E upon rHE FoLLowrNG coRREGTToNS:
CORRECTIONS
DATE ,'t "-'' * -l,i -
.Pt rNsPEcloruEC 5 1974
'": "'
FIEOUEST
VAIL
DATE " :,'. '-l
TIME RECEIVED ".I AM PM
! orsen
MON
GOMMENTS:
TUE
E pnnrral LocATroN
READY FOR INSPECTION
WED THUR rnr i AM PM
f,-'l epp RovED E orsnppRovED E nerNsPEcr
E UPOT,T THE FOLLOWING GORRECTIONS:
CORRECTIONS
DATE /l
INSPECTOR
.'rd 0EC 5 1974
rNseecr0ru
TOWN
FIEOUEST
IL
tr -. | \DATE*1-i L!a'/'I
TfME RECETVED z'5r_ ArU,flt4 CALLER
E orxen
MON
COMMENTS:
TUE
E penrrnu LocATroN
READY FOR INSPECTION
FRI AM PM
\F.APP RoV E D E orsappRovED D nerNsPEcr
E uporu THE FoLLowrNG coRRECTToNS:
CORRECTIONS
INSPECTOH
.
DATE ..' , J-,]tr . ..,'(,
rNsPEcrGru rtEcluEsr
TOWN AIL
E
Rtt oEc 181974
DATE
TIME neCetveO i.,. c,:.. eru,PtS CAL
fiorHen cit-c. i F)<x,seve- E pannnl.
READY FOR INSPECTION
..
"tu-e, '*.f?, i' WED THUB
[]*rpRovED ! orseppRovED
E upon rHE FoLLowrNG coRHEcrloNs:
CORRECTIONS
LOCATION
D nerNsPEcr
DATE ../:,1_ -- ., \:: .- -) '....''
INSPECTOR
rNsPEcrrlt" HEeuEsrRU NoV27874 TOWN OF VAIL
DATE
TIME RECEIVED
! orxen . 2:. ' -- '- E pnnrrer
READY FOR INSPECTION
THUR
LOCATION
El"eppRovED I orsnppRovED ! nerNSPEcr
INSPECTOR
DATE ,/,,/ , l ),. ;:-
o
15 t974ffu ilov
oINSPECTIc'N
TOWN OF
FIEOUEST
VAIL
JOB NAMF.--..
TIME RECEIVED AM PM CALLER
I orxen
MON
COMMENTS:
D pnnrrnu LocATroN
READY FOR INSPECTION
TUE WED THUR '- FRl .AM PM
D orsnppRovED
LJ UPON THE FOLLOWING CORRECTIONS:
CORRECTIONS
( nerRovED E nerNSPEcr
DATE
INSPECTOR
zo
F
e
tt)2
z
a
E
z
2
ec
a
'
+
F
=E
!J
xolll
oz
4
2o
ig
o
ll,l
G
u,l
o(,z
z
F.o
LI
6
9llr
F
at
2
z
o
,l
aD
F
!r!
Fr
F.
'zvo
'.
&:
qr
z
st
o
F
Iu
G
Eoo
lt
UJE
Fo
Js
oF
!,1E
ooJtt
J
FoF
9
zul
Eut
aD
ql
t
Er
lrl
B
o
z
I
o
Jf
E
-l<
lr-e)
-
-ett-
4
UTE
2o
oo
zo
F
c
IJJF z
o
J)o
ILo
tgo
.AGul
Yz
E
o!t
tt
ez
0z
J
Ito
ct2
(9
=J
lt
x
Jo
FoJ
Gr
:-->(9,G
u,
=o o
zo
Falcaf-oFE40
=>xrJ-z:<
urD4t)i8
; c,i
zo
t-
fcc
tto!lF
o
$
\
\
$\
\
Fru nov(i rgzn rNs"=r-.|bt ,.EouEsr
DATE
WN OF VAIL
TIME RECEIVED
E orxen
MON FBITUE
f] pnnnnl LocAnoN
READY FOR INSPECTION
THUR AM PM
Wxpp RovED D or sepp Rov E D E nerNsPEcr
El-uporu THE FoLLowlNG coRRECTToNS:
CORRECTIONS
, --:, ., : .1- .,'.' 4.'. L,r' 1 zr La, .z'
DATE
INSPECTOR
A
DESIGN REVIEI.I BOARD
DATE 0F MEETII,IG; SePtember 19, L974
Hubff , Bill ,/'MTI4BERS PRESENT:
Abbott, Duldey
Hanlon. Bil-1
SUBJECT: ROBERT LAZIER - new bui'lding in
ACTION TAIGN BY BOARD:
MOTI0l{ -4
V0TE: FOR:
SEC0NDED BY ,.-i.< z "-*"'+'a-'L"L a>Za"rL7 ,J .6zZcz4.
-lD-(
I
D---
-hnt-&rt-t' o4fuzt'e"o.'
APPROV ED:
DISAPPROVTD:
Parker, Lou
Sage, Dave
Z"'t *(zL-*or
z/&rt
a/ O'iaA.*
//.: -b
/*rc(24/t'T'Y-ffia*'-
,,
)
'1
!.I
0.,
/ - --./ -r* ,r**r/- 44'-'D 'd";O/on/ea'- /2 U iU.
'J
DESIGN REVIEI'I BOARD
DATE 0F MEETIIIG: Auqust 29, 1974
SECONDED U'&:
/
FOR:
APPROVED:
DISAPPROVED:
SUMI4ARY:
-/
MEI4BERS PRESENT: Ruoff Bi I I t/
-a-. Au!qt!,--QCd.l-9J---(/'-
Han'lon. Bi I I
'.Parker. Lou t//
-/
Sage, Dave . -
SUBJECT:
ACTION TAI(EIi BY BOARD:
MOTION
VOTE:
ROBERT LAZIER -rel imi nary rev'igry ql
proposed building in Lionshead - Parce
(at the request of Town Counc i1 )
trIH"$UI .
ol Sccndlnovlo
JOHN M, ISAKSEN
T$ra of Yai.l
Deelga Rewlev Eoard
Tall , Colorado 81657
Ncrember 25, 1774
Ilre planc for tbe frontaL exterior
llus Shop oonforns to antl meots nY
bnrlndin3.
of tbe proposeil Nord
etaDdard g for the
f,aeler r
ll02Grand Saint Daul, ilinnesota zz6-5650
Jst
vl4
od
oz
t;ss
$n
{
{st
eg
N.
-J
E
\-
{
mtuIrf
I? --- -\$rA:t i
13-=:IJ
o
;
txI
3
{b-3
<.-
ria€t1
bqitilgle
-r*<3
1:3 -'la-.r-c-o
7
5F7I7
t
E
J
L
3
0
d
3tu
c$|
-\t.'|-J
6-
all\.J
THE BANK oF VA IL ' vA Il
5:
CILBRAD{i 81557
*+* YOUR gO.DAY ACCOUIiT IS NO!{ EARN I T]f 5. 50 PCT ***f
+ CTJMPOUNDEO DAILYI THIS YIELDS 5.65 PCT ANNUALLY **
P4sSr.J,
T n[.JrJ rF VA IL '\N il
lriiq! R I r l-iZI,iR
J-X I r,,n
VA I I- {- OL']R. A IJ I
fi'PR FV rJALl\lCt-
I \T I4.9)-
,r3P',
tr )ll.I/+
I r 115. 05
7
/)/ //, /,
h/ a?4
llecmber 17, 1974
Flr. Mlke Lohen
Bank of Vall
Usil, Colomdo
Rcs EiGFef Account fn thc rnornt of $5,000 hrld fo|' Robcrt T. Lnrlor
and the Tom of Yall JolntlY
9err illka:
Yorrane htreby authsr[€d to release 54,000.m tn Rohrt T. Lazlcr
In rcesrdlnce wlth Scrtlon 6 of Agrornrent deted ttoY€nb€r 4, 1974.
th. Lazler has suhnltted an catlnats of fundg expended to tht To1ttt
of urtl for ttn plala arur {n the mornt of f5,9?5 {n partlrl con-
ittrncc wlth tha'Agrcmnt. $I,009.$ lr tO bc retrlaed In tht e!8r!0u
lccwnt to sssure ttr cfrpletlsr of the lndrcrplE.
Yours truly,
MPANTilFff OF COTNil'IITTV DfVELOHfiIIT
Olana 5. Toughlll
Zonlng A&lnlstrator
DEPART}iET{T OF FIITANCE
Stanley F. Bernsteln
0lrector
!.,
/1
,J
tLi
"r'.; \ A I| -r it
,..);, v"\- r! ''q*\-il \i\ \,.t I
l{"..1.1 .: ._v
/\ r-l'\r\.\ *1/
.1 \
LAl
'\\\ tr\v
.,-1
Ii,
t
J.
I
Y"r-z-
iL u,,.J c r" r
*f
L"a'nll. 8 VJrsFt+t 7o'/l"s
sfr ;-, t ? Yd, S
L* ho-
Lqbo-
€6o c.-r tL
F t. ^ ,',u1
D;-T k'ra-k
4L obo.-
o0
sO
oQ
o I ?v-l
t*1at +
-b+s +
f f c 4i,**.on-l
I
J-,'t',5t* s |l0
-t,; I. -- Lab on
h+f t ",
Fl< *f
l*t*f
3oo
3.r. 33 o
{ Jo
t + zrb!
rnr $.r J e lt' jo.l
rr* f s
,l: g' t r-oo *
l6oo e
8oo I
o4
C co ''n
,9s e6 '
{ ro'1"
aOlo.toe
b1 zr se