ENGINEERING
2009 INTERNATIONAL BUILDING CODE
2008 NATIONAL ELECTRIC CODE
TIA/EIA-222-G OR LATEST EDITION
GENERAL NOTES
I THE FACILIIY IS UNMANNED AND NOT FOR HUMAN
HABITATION. A TECHNICIAN WILL VISR THE SITE AS
�I REQUIRED FOR ROUTINE MAINTENANCE. THE PR0.IECT
IWILL NOT RESULT IN ANY SIGNIFICANT DISTURBANCE OR
EFFECT ON DRAINAGE; NO SANRARY SEWER SERVICE,
' POTABLE WATER, OR TRASH DISPOSAL IS REQUIRED AND
! NO COMMERCL4L SIGNAGE IS PROPOSED.
PROJECT DESCRIPTION
I THE PRWECT CONSISTS OF THE INSTALLATION AND
OPERATION OF ANTENNAS AND ASSOCIATED EQUIPMENT
CABINEfS FOR AT&T'S WIRELESS TELECOMMUNICATIONS
N Ef WORK.
SITE INFORMATIOIV
PROPERlY OWNER: JAYNE BRANDESS REVOCALE
ADDRESS: 41184 HWY 6
AVON, CO 81620
SITE NAME: WEST VAIL
SITE NUMBER: COU4066
SITE CONTACT: BRUW O�REILY
SITE ADDRESS: 2077 N. FRONTAGE RD. WEST
VAIL. CO 81657
COUNTY: EAGLE COUNN
LATffUDE (NAD 83): 39' 37� 57.8� N
LONGITUDE (NAD 83): 105 24' S2.8' W
ZONING JURISDICTION: TOWN OF VAIL
ZONING DISTRICT: COMMERCL4L CORE 3(CC3)
PARCEL �: 742656
OCCUPANCY 6ROUP: 8, ACCESSORY USE
CONSTRUCTION TYPE: V-B
POWER COMPANY: HOLY CROSS ENERGY
TELEPHONE COMPANY: CENTURYLINK
SITE ACQUISITION ETHAN GOODWIN
CO NTACT: 720.2 73.4187
SITE ACQUISITION MIKE MCCREEDY
MANAGER: 303.332.1212
RF ENGINEER: WINNIE LAI
314.724.9605
PROJECT MANAGER: PATRICK DOYLE
720.834.4260
CONSTRUCTION MISHA MORROW-KRALJIC
MANAGER: 720.834.4320
ARCHITECT: CSAi
5935 S. ZANG ST., SUITE 280
LITfLEfON, CO 80127
OFFICE: 303.932.9974
IF USING 1 1"x17" PLOT, DRAWINGS
WILL BE HALF SCALE
CONTACT II�IFORMATION
BdcV ENGINEER: BtACK & VEATCH CORPORATION
304 INVERNESS WAY SOUTH
ENGLEWOOD, C0. 80112
CONTACT: PATRICK DOYLE
PHONE: 720.834.4260
WEST VAIL
COU4066
3755444125
}�y..�.,• �
r";�.� 1�«� * �
� �
° , '.,., /
LTE
RooFToP
�C\1����� �'l��'{ ��';
:�Oi�PLiAN�E
��t�r /o���L
-�,,.. � TT-_—�---�-, ,�-_..�_
i�� - m�1�--
- � ;Z O /
VICINITY MAP LOCAL MAP
I-70
S� VAIL I-70
SITE
�, ��.
Q�\+3' �PG�Q,O• �O�PGF.
G� a Fcc�� ��O
�
MINTURN
24
1� �
1 �
��a .n��
r r
NO SCALE
DRIVIIVG DIRECTIONS DO NOT SCALE DRAWINGS
DIRECTIONS FROM NEAREST AT&T OFFlCE: SUBCONTRACTOR SHALL VERIFY ALL PLANS dc EXISTING DIMENSIONS &
CONDffIONS ON THE JOB SffE & SHALL IMMEDIATELY NOTIFY THE
TAKE I-70 WEST TO VAIL, TAKE WEST VAII EXR �173, PROCEED ENGINEER IN WRITING OF ANY DISCREPANCIES BEFORE PROCEEDING
EAST PAST CfTY MARKEf (ON FRONTAGE RD. NORTH OF HWY) TO WITH 1HE WORK OR BE RESPONSIBLE FOR SAME
BRANDESS BUILDING AT 2077 N. FRONTAGE RD. WEST (ON LEFf).
SfTE IS IN STE. B
UNDERGROUND SERVICE ALERT
� UTILITY NOTIFlCATION CENTER OF COLORADO
� (800) 922-1987
WWW.UNCC.ORG
3 WORKING DAYS UT1UN NOTIFICATION PRIOR
TO CONSTRUCTION
Q���a��
� SEP 17 �012
TOWN OF VAIL
APPROVALS
THE FOLLOWING PARTIES HEREBY APPROVE AND ACCEPT THESE DOCUMENTS
AND AUTHORIZE THE CONTRACTOR TO PROCEED WITH THE CONSTRUCTION
DESCRIBED HEREIN. ALL DOCUMENTS ARE SUBJECT TO REVIEW BY THE LOCAL
BUILDING DEPARTMENT AND MAY IMPOSE CHANGES OR SITE MODIFICATIONS.
AT&T COMPLIANCE: DATE:
AT&T RF ENGINEER: DATE:
AT&T OPERATIONS: DATE:
AT&T PM: DATE:
B&V CONSTRUCTION: DATE:
B&V SITE ACQ: DATE:
SITE OWNER: DATE:
DRAWING INDEX
SHEET SHEEf TffLE
T-1 T1TLE SHEEf
C-1 SRE PLAN
C-1.1 EQUIPMENT SHELTER FLOOR PLAN
C-2 ELEVATIONS
C-3 ANTENNA PLANS
C-4 EQUIPMENT DEfAILS
C-5 E�UIPMENT DEfAILS
C-6 EQUIPMENT DEfAILS
E-1 ELECTRICAL PLAN
E-2 ONE-LJNE DIAGRAM
E-2.1 PANEL SCHEDULES
E-3 ELECTRICAL DC ONE-l1NE DIAGRAM
E-4 ELECTRICAL DC SURGE PROTECTOR DIAGRAM
G-1 GROUNDING PLAN
G-2 GROUNDING DEfAILS
G-3 GROUNDING DEfAILS
G-4 GROUNDING DEfAILS
GN-1 GENERAL CONSTRUCTION NOTES
GN-2 GENERAL SRE WORK/DRAINAGE NOTES
GN-3 GENERAL ELECTRICAL NOTES
i �'F
f . A
at&t
�
188 INVERNESS DRNE WEST
SUITE 400
ENGLEWOOD, CO 80112
�.
BLACK & VEATCH
304 INVERNESS WAY SOUfH
SUITE 400
ENGLEVYOOD, CO 80112
CSAi
CHARLES STEGKLY ARCHRECTURE� Inc.
ARCHITECTURE — PLANNtNG — DESIGN
5935 SOU7H ZANG SiREET, SUIIE 280
urnerori, ca�orsnoo eoiz�
OFFlCE: 303.9329974
, FA%: 303.932.8581
PRQIECT N0: COU4088
DR4WN BY: SGP
CHECKED BY: CS
a oa/oe/iz co awc
� s/as/iz co rsflncw
xtv wh oESC�rnoe
LICENSLIRE NO:
.�UN 0 S 2Q1�
CONSULTANT;
SITE NAME:
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL, CO 81657
LTE—ROOFfOP
TITLE SHEET C
�
SHEET NUMBER:
�
�~ � �
�' •
�
w
N
� e LEGEND
>�
3 � FENCE X
a
�o ICE BRIDGE
% N
m o OVERHEAD POWER p�.{p
� ' OVERHEAD TELCO ❑HT
a io
�a 1 ELECTRICAL PLAN
�a
NOTES:
1.) ALL WORK IS IXISTING U.N.O.
2.) ALL NON—AFFECTED EQUIPMENT IXCLUDED FOR
cuRm�.
X 3.) FlBER TO BE ROUTED ON A NEW 6' RACEWAY
OR ATTACHED TO L—BRACKEfS TO THE SIDE OF
�f�l�l THE D(ISTING RACEWAY
COAX ENTRY
PORT IN WALL
NEW LTE RACK
RE: ARCH.
NEW LINEAGE
RE: ARCH.
�
NORTH
r s• o
NOTES:
1. CONTRACTOR TO INSTALL 6" RACEWAY ATfACHED TO DCISTING R4CEWAY BY L—BRACKETS.
PROPOSED DC AND FlBER OP11C CABLE TO BE ROUTED WITHIN.
2. THE CONDUfT ROUTING IS SHOWN DIAGRAMMATICALLY ON THE PLANS AND IS ONLY AN
APPROXIMATION. THE EXACT LOCATION AND ROUTING SHALL BE FlELD VERIFlED.
3. ALL DISCONNECTS AND CONTROWNG DEVICES SHALL BE PROVIDED WITH EN6RAVED
LAMICOID NAMEPLATES, INDICATING THE CIRCUITS ORIGINATION AND ALL EQUIPMENT
TERMINATIONS.
4. CONTRACTOR SHALL PROVIDE ALL CONDUITS AND CIRCUITS AS RE�UIRED FOR A
COMPLETED SYSTEM AND SHALL BE IN COMPWWCE WITH THE MANUFACTURER'S
SPECIFICATIONS.
5. CONTRACTOR SHALL PROVIDE STRAIN—RELIEF AND CABLE SUPPORTS FOR ALL CABLE
ASSEMBLIES, COAX CABLES, AND AISG RET CABLES. CABLE STRAIN—REUEF & CABLE
SUPPORTS SHALL BE APPROVED FOR THE PURPOSE. INSTALlATION SHALL BE IN
ACCORDANCE WRH MANUFACTURER'S SPECIFlCATIONS AND RECOMMENDATIONS.
6. FIBER TO BE ROUTED IN NEW 6' RACEWAY OR ATfACHED TO L—BRACKETS ALONG SIDE
OF THE EXISTING RACEWAY.
ABBREVIATIONS
AC ALTERNATING CURRENT
AIC AMPERAGE INTERRUPTION CAPACITY
ATS AUTOMATIC TRANSFER SWRCH
AWG AMERICAN WIRE GAUGE
BTC BARE TINNED COPPER CONDUCTOR
BATT BATfERY
CHG CHARGING
COMM COMMON
DC DIRECT CURRENT
DIA DIAMEfER `,'e�V �� [;
DWG DRAWING � � ���
EC ELECTRICAL CONDUCTOR
EMT ELECTRICAL MEfALLIC TUBING � O�Z��.�
FlF FACILITY INTERFACE FRAME �
GEN GENERATOR �
___—.: �^ C�
GPS GLOBAL POSRIONING SYSTEM �
GSM GLOBAL SYSTEM FOR MOBILE
HVAC HEAT/VEMILATION/ AIR CONDITIONING
IGR INTERIOR GROUNDING RING (HALO)
MGB MASiER GROUNDING BAR
MIN MINIMUM
MTS MANUAL iR4NSfER SWRCH
M/W MICROWAVE
NEC NAl10NAL ELECTRICAL CODE
OC ON CENTER
PP POtARIZING PRESERVING
PCU PRIMARY CONTROL UNR
PDU PROTOCOL DATA UNIT
RECT RECTIFlER
RET REMOTE ELECTRICAL TILT
RMC RIGID MEfALLIC CONDUIT
RRH REAAOTE R4DI0 HEAD
RRU REMOTE RADIO UNR
RWY RACEWAY
SIAD SMART INTEGRATED ACCESS DEVICE
TMA TOWER MOUNT AMPLIFlER
TVSS TRANSIENT VOLTAGE SUPPRESSION SYSTEM
T(P TYPICAL
UMTS UNNERSAL MOBILE TELECOMMUNICATIONS SYSTEM
UPS UNINTERRUPTIBLE POWER SUPPLY (DC POWER PLANT)
��� at&t
�
188 INVERNESS DRNE WEST
SUfTE 400
ENGLEWOOD, CO 80112
�.
BLACK & VEATCH
304 INVERNESS WAY SOUTH
SUfTE 400
ENGLEWOOD, CO 80172
CSAI
CMARLES 8TEGKLY ARCHREGTURE. Inc.
ARCHI7ECTURE — PLANNING — DESGN
5935 SOUTH ZANG SIREET, SVITE 280
um.era+, caoR�oo eoiz�
OFFlCE: 303.932.9974
FAX: 303.932.8581
PRQIECT N0: COU4086
DRAWN BY: SGP
CHECKED BY: CS
CD �SUE
� �; �� � c� � .
.
.
: �•
. •
: 32097 z
-�. . •
•
;�',�1� N 0 8 ,2��
� .. . � •...� . . .A7
DENNIS GREVEL, P.E.
1 231 1 WEST PRENTICE Pv+CE
LITTLETON, COLORADO 801 27
PHONE: 303.478.3337
SRE NAME:
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL, CO 81657
LTE—ROOFTOP
ELECTRICAL
P LAI�I
SHEET NUMBER:
�~ �
�' -
O
fV
�
N
�
UE
>�
�<
3Q
F N
J O
� N
m A
� O
C
7
aW
N �
��
�a
� at&t
�
188 INVERNESS DRNE WEST
SUITE 400
ENGLEWOOD, CO 80112
�.
BLACK & VEATCH
304 INVERNESS WAY SOUTH
SURE 400
ENGLEWOOD, CO 80712
CSAI
CHARLE3 STECKLY ARCMITECTURE� Inc.
ARCHITECTURE — PLANNING — DESIGN
5935 SOU1H ZANG S7REET. SVIIE 2B0
urnFra+, caa��no eoiv
OFFlCE 303.9329974
FAX: 303.9328581
PROJECT N0: COU4088
DRAWN BY: SGP
CHECKED BY: CS
CU �Sl1E
W RENEY/
� - �p . v � .
C;;
: '
• 32097 ;
�-';•�UN 0 8 2a#�
.._ .•� ..
DENNIS GREVEL, P.E.
1 23 1 1 WEST PREN77CE PI.ACE
LRTI_ETON, COLORADO 801 27
PrtoNE: 303.478.3337
SITE NAME:
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL, CO 81657
LTE—ROOFfOP
SHEET TITLE:
ONE LINE
D IAG RAM
SHEET NIJMBER:
� � 1�
3
v, '
�
0
� E
>�
�v
3Q
F N
J �
% N
� �
m A
�°
�
ao
N W
��
�a
EXISTING PANEL A
120 208 VOLTS, � PHASE, 3 WIRES, SN, 200 AMP BUS, 200 AMP MAIN, �B
to,000 A.I.C. RATING (MINIMUM), NEMA 3R ENCLOSURE, SURFACE MOUNTED
MFG RE: 1-LJNE
DESCRIPTION WIRE BKR POLE CKT VA VA CKT POLE BKR WIRE DESCRIPTION
CU-1 #6 50 2 1 2340 A 1000 Z 2 z0 #12 FC-1
3 2340 B 1000 4
RECTIFIER #1 * #�0 30 2 5 1440 A 1440 6 2 30 �10 RECTIFIER #2 *
7 1440 B 1440 8
RECTIFIER #3 * #10 30 2 9 1440 A �q40 10 2 30 ��� RECTIFIER #4 *
11 1440 B 1440 12
RECTIFIER #5 �` #�0 30 Z 13 1440 A �44p 14 2 30 ��� RECTIFlER �6 **
15 1440 B 1440 76
RECTIFIER #13 (FUT.) #10 30 2 17 - A - 18 2 30 #10 RECTIFIER #14 (FUT)
19 - 8 - 20
RECTIFIER #15 (FUT.) 10 30 2 21 - A - 22 2 30 #10 RECTIFIER #16 (FUT)
23 - B - 24
RECTIFIER #17 (FUT.) #10 30 2 25 - A - 26 2 30 #10 RECTIRER #18 (FUT)
27 - B - 28
LIGHTS �j12 20 1 29 100 A 100 30 1 20 12 LIGHTS EXIT SIGN
INTERIOR RECEPT. #12 20 1 31 500 B 500 32 1 15 �p WTERIOR RECEPT.
SPACE - - - 33 - A - 34 - - - SPACE
SPACE - - - 35 - B - 36 - - - SPACE
SPACE - - - 37 - A - 38 - - - SPACE
SPACE - - - 39 - B - 40 2 30 #10 SPARE
SPACE - - - 41 - A - 42
NOTES:
'�` = REMOVE EXISTING POWER PLANT & REPLACE WfTH LINEAGE CABINET. (LOADS ARE SHOWN EQ. TO (E))
'�"�` = NEW ADDED RECTIFlER LOADS
PHASE A= 10.740 VOLTAMPS PHASE B= 17.540 VOLTAMPS
EXISTING PANEL LOAD CALCULATIONS
LIGHTING Z04 VOLTAMPS X 1.25 = 250 VOLTAMPS
RECEPTACLES-- 1ST 10KVA ��aa VOLTAMPS X 1.00 = 1000 VOLTAMPS
RECTIFIERS �'��� VOLTAMPS X 7.00 = 74400 VOLTAMPS
CU-1 4680 VOLTAMPS X 1.25 = `�50 VOLTAMPS
FC-1 2004 VOLTAMPS X 1.00 = 200� VOLTAMPS
OTHER VOLTAMPS X 1.00 = - VOLTAMPS
15.650 TOTAL DEMAND VA
65.2 AMPS, 10, 3W, 240V
PHASE A= 12.180 VOLTAMPS PHASE B= 12.980 VOLTAMPS
NEW PANEL LOAD CALCULATIONS
LIGHTING Z�a VOLTAMPS X 1.25 = 250 VOLTAMPS
RECEPTACLES-- 1ST tOKVA 1000 VOLTAMPS X 1.00 = ��� VOLTAMPS
RECTIFIERS 17280 VOLTAMPS X 1.00 = »280 VOLTAMPS
CU-1 4680 VOLTAMPS X 1.25 = 5850 VOLTAMPS
A/C-1 2000 VOLTAMPS X 1.00 = 2000 VOLTAMPS
OTHER VOLTAMPS X 7.00 = - VOLTAMPS
26,380 TOTAL DEMAND VA
109.9 AMPS, 1 P1, 3W, 240V
NOTES:
1. THE SCOPE OF WORK SHALL DICTATE THE EQUIPMENT TO BE INSTALLED. EQUIPMENT SHALL BE EQUAL TO OR BEffER THAN REFERRED
VENDORS.
2. CONTRACTOR SHALL VERIFY THAT THE SITE PANEL IS AS SHOWN. IF THE SRE PANEL IS NOT AS SHOWN, CONTRACFOR SHALL NOTIFY THE
ENGINEER AS SOON AS PRACT1CABlE.
3. CONTRACTOR SHALL PROVIDE ALL CONDUITS, CIRCUffS REQUIRED OF A COMPLEfED SYSTEM AND SHALL BE IN COMPLIANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR AS-BUILT PANEL SCHEDULE AND SITE DRAWINGS.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR TESTING OF THE AC AND OC POWER SUPPLY SYSTEMS AND FOR VERIFYING THAT THE PROPOSED
iELECOM EQUIPMENT CAN WORK PROPERLY IN CONJUNCTION WRH THE DCISTING ELECTRICAL SYSTEM. THE TEST RESULTS IN ACTUAL LOADS
SHALL BE DOCUMENTED USING THE FORMS PROVIDED IN ATQcis DOCUMENT TffLED °SITE SURVEY A5.° ALL FORMS SHALL BE COMPLEiED IN
THEIR ENTIREfY. THE AS FORM SHALL BE PRESENTED TO THE CONSTRUCTION MANAGER WELL IN ADVANCE OF PLACEMENT OF NEW TELECOM
EQUIPMENT.
6. LOADS SHOWN ARE ASSUMED BASED ON HISTORICAL DATA
PANEL SCHEDULES
EXISTING PANEL B
20o AMP BUS, 200 AMP MAIN, �B
120 208 VOLTS, � PHASE, 3 WIRES, SN, SURFACE MOUNTED
to,000 A.I.C. RATING (MINIMUM), NEMA 3R ENCLOSURE,
MFG ae i-ur�
DESCRIPTION WIRE BKR POLE CKT VA VA CKT POLE BKR WIRE DESCRIPTION
CU-2 #6 50 2 1 2340 A 1000 2 2 20 #12 FC-2
3 2340 B 1000 4
RECTIFIER �7 �`* ii10 30 2 5 1440 A 1440 6 2 30 #10 RECTIFlER �8 **
7 1440 B 1440 8
RECTIFIER �l9 '�"�` ii t o 30 2 1g 1440 B � qq� � 0 2 30 �� � RECTIFlER �10 *
RECTIFIER #11 (FUT.) #�0 30 � 13 - A - 14 2 30 #10 RECTIFIER #12 (FUT)
15 - B - 16
RECTIFIER �19 (FUT.) ��� 30 2 17 - A - 18 2 30 #10 RECTIFIER #20 (FUT)
19 - 8 - 20
RECTIFIER #21 (FUT.) #10 30 2 21 - A - 22 2 30 #10 RECTIFIER #22 (FUT)
23 - B - 24
RECTIFIER #23 (FUT.) #�� 30 2 z5 - A - 26 1 30 #10 SPARE
27 - B 100 28 1 30 #10 CIENA POWER
LIGHTS #12 20 1 29 100 A 100 30 1 20 12 RECEPT. RT
INTERIOR RECEPT. #12 20 1 31 500 B 500 32 1 20 �2 RECEPT.
SPACE - - - 33 - A - 34 - - - SPACE
SPACE - - - 35 - B - 36 - - - SPACE
SPACE - - - 37 - A - 38 - - - SPACE
SPACE - - - 39 - 8 - 40 2 30 #10 SPARE
SPACE - - - 41 - A - 42
NOTES:
'�` = REMOVE EXISTING POWER PLANT & REPLACE WITH LINEAGE CABINEf. (LOADS ARE SHOWN E�. TO (E))
'k'k = NEW ADDED RECTIFIER LOADS
PHASE A= 3440 VOLTAMPS PHASE B= 4340 VOLTAMPS
EXISTING PANEL LOAD CALCULATIONS
LIGHTING 100 VOLTAMPS X 1.25 = 100 VOLTAMPS
RECEPTACLES-- 1ST 10 KVA 100� VOLTAMPS X 1.00 = 500 VOLTAMPS
RECTIFIERS - VOLTAMPS X 1.00 = - VOLTAMPS
CU-2 4680 VOLTAMPS X 1.25 = 5850 VOLTAMPS
2000 VOLTAMPS X 1.00 = 2000 VOLTAMPS
FC-2 �pQ VOLTAMPS X 1.00 = �40 VOLTAMPS
OTHER
8,550 TOTAL DEMAND VA
35.6 AMPS, 10, 3W, 240V
PHASE A= 12.780 VOLTAMPS PHASE B= 10.100 VOLTAMPS
NEW PANEL LOAD CALCULATIONS
LIGHTING 100 VOLTAMPS X 1.25 = 100 VOLTAMPS
RECEPTACLES-- 1ST 10 KVA ��a� VOLTAMPS X 1.00 = 500 VOLTAMPS
RECTIFIERS ��520 VOLTAMPS X 1.00 = ��520 VOLTAMPS
CU-2 4680 VOLTAMPS X 1.25 = 5850 VOLTAMPS
2000 VOLTAMPS X 1.00 = 2000 VOLTAMPS
FC-2 �pp VOLTAMPS X t.00 = 100 VOLTAMPS
OTHER
20,640 TOTAL DEMAND VA
83.5 AMPS, 10, 3W, 240V
:�. V i �.V� � i..J� r
�'� �� � �_.. � :�. � "'��' .
. - __�� �---� � �
_-K�-�_�- --_�..__--.-�-�-
��
��' at&t
�
188 INVERNESS DRNE WEST
SUfTE 400
ENGLEWOOD. CO 80112
�.
BLACK & VEATCH
304 INVERNESS WAY SOUTH
SURE 400
ENGLEWOOD, CO 80112
CSAI
CXARLES STEGKLY ARCMITECTURE� Inc.
, ARCHITECTURE - PLANNING - DESIGN
� 5935 SOUTM ZANG S1F2EET, SUI7E 280
urnETOr+. caaa�oo amz�
OFFlCE: 303.9329974
FAX: 3(13.932.8581
PROJECT N0: COU4088
DRAWN BY: SGP
CHECKm BY: CS
CO �SUE
;' V ; �� Ab (yh, ' �t.�'
.
•
: ;
' 32097 '
. �
o •
•
� �,�tJ N 0 8 24�
� L!
��`H � �,..: . (',i �! � � N �� �,C'.� �t•
DENNIS GREVEL, P.E.
1 231 1 WEST PRENTICE Pl.4CE
LITTLETON, COLORADO 8O 1 27
PHONE: 303.478.3337
SITE NAME:
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL, CO 81657
LTE-ROOfTOP
PANEL
SCHEDULES
SHEE7 NUMBER:
��2. �
0
W
�-
0
�
U
� E
>�
�'�
3Q
w
J �
� N
a'7 _
m n
� O
�
ao
Nk
oQ
��
TO AC LOAD
CENTER
ONE LINE
ROUTE TO
MASTER
GROUNDING
RAAAARAAAAAA�
l<tttt<tt<tt
RECT RECT RECT RECT RECT RECT
/e %� �2 � %4 %5
CM RECT RECf RECf RECf RECT
/reu+ h i2 N3 /+ is
� YCAP SURGE
PROTECTION
DC12-48-60-RM
� �SA2 1:
I BLANiC�
I BLANK9
I BLAN"11
I BLAN�C3
� 8�15
I BLAN�
I BIAN�C9
I au"'�i
I BLAN�3
�
6
BLANK
BBLANK
�BLANK
�BLANK
�BLANK
16
BUWK
18
BLANK
20
BLANK
z2
BLANK
24
i RRH
� �1
I
PROPOSED --i
MOUNT LOCATION ;
CABLE SHEILD
iNP)
I
I
48VDC DISTRIBUTION
� PANEL
I �
-----------------RRH
�2
�
� .
�
�
�
�
I j RAYCAP SURGE
� �p i PROTECTION
� iDC2-48-60-0-9E
I i � '�Y...
1 I
� I
i i
��
,�
�
� r
� i
I �
I �
' �--�----- �-------
I
i i
I �
'----r— ----------------
i
i
i
� 7 8 9
I
I
_____________________ ;
RRH i
�3 ;
r� �
RAYCAP SURGE
PROTECTION
DC2-48-60-0-9E
i
I
-_---J1----- ------- - - �,
RAYCAP FIBER OPTIC & DC POWER
CONNECTION JUNCTION BOX
FC12-PC6-10E
i
i
i
i
i
i
i
i
i
i
I
I
i
1
b--FlBER OPTIC
i CABLE (TYP)
i
i
i
i
i
i
i
i
ii
r----�----j
---------------------- �
I I � «�E �+o uNrz E�_ ,�CA�L—LUCENr
I I I I 94t2 CABINET
� +�,�,�,�,-+�,�,�,�,-+�,�,�,�,-+�,�,�,�,- � � I
I I FUSE I
� �'�'���� +�'�'���� +�����'�� +�������� � B� �
� +�������� +�������� +�������� +�������� � � �
I � � � �' +� � � �' +� � � �' � � � �' I
�------------
EXISTING GROUNDING
RING
( I
L--------—�
EXISTING GROUNDING
RING
� RAYCAP SURGE
PROTECTION
DC2-48-60-0-9E
-�*�_����;���.� ��.
f:C��P�I�i��
._, �, . � t �a. ...2.�� �_ �-
, � .,_. . . _
� - ---.,_.,"``o._
� ��
ROUTE TO THE
NEAREST GROUNDING
BAR (TYP)
(SPAF2E)
N.T.S.
. � at&t
�
188 INVERNESS DRIVE WEST
SURE 400
ENGLEW000, CO 80112
0.
BLACK & VEATCH
304 INVERNESS WAY SOUTH
SUITE 400
ENGLEWOOD, CO 80112
CSAI
CHARLES 8TECKLY ARCMRECTURE. Inc.
� ARCHI1ECiURE — PLANNING — DESGN
5935 SOU7H ZAHG S7REET, SUIIE 2B0
um�ror+. co�oR�no eois�
OFFlCE 303.932.9974
FA%: 303.9328581
PROJECT N0: COU4088
DR4WN BY: SGP
CHECKED BY: CS
CO ISUE
:•�v�T :
•
: 32097 s
. :
'';�1� N 0 8 2¢��
. �.•�� ,
���°a n_•••.•••:•.;,.�.'� i:�
DENNIS GREVEL, P.E.
1 23 1 1 WEST PREN77CE PtACE
LITTL.ETON, COLOR.4D0 801 27
PHONE: 303.478.3337
SITE NAME:
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL, CO 81657
LTE—ROOFTOP
SHEEr Trt'�:
ELECTRICAL DC
ONE-L1NE DIAGRAM
SHEEi NIJMBER:
�M�
��
F
�
B�
c�
TO
ALARI
�' -
v
v
b'
UE
•W �
�°
�Q
W
ra
J �
� N
m O
� �
aW
N �
��
ga
ROUTED
TO RRH
RAYCAP SURGE PROTECTOR - DC2-�48-604�9E
LOCK
ROUTED
TO RRH
PROPOSED FUTURE
RRH�S RRH'S
A1 B1 C1 A2 82 C2 ' C7
BLACK BLACK BLACK BLACK BLACK BLACK O
dc ac dc & dc Qc
BLUE ORANGE GREEN BLUE ORANGE GREEN
RERIRN
BLACK BIACK BLACK BLACK BLACK BLACK O
FROM FROM FROA� FROM FFtOM FROM
GROUND GROUND GROUND GROUND GROUND GROUND
RED RED RED RED RED RED O
& �C � & � �
BLUE ORANGE GREEN BLUE ORANGE GREEN
—48V
RED RED RED RED RED RED
FROM FROM FFiOM FROM FROM FROM O
BREAKER BREAKER BREAKER BREAKER BREAKER BREAKER
REAR VIEW SURGE PROTECTOR-DC6-48-60�RM
C2
O
�
O
�
C3
�
�
O
�
D1
�
�
O
�
LOC
D2
0
O
�
�
sruos (�)
D3
O
�
�
ROUTED � � -�'�`� � �
� � _. _
TO RRH ' � 7'^^
� �t� • .,.-.�� �.zr �
y � . � �_ ---__�--__.
�
�
TO GROUNDING
BAR
NO (DO NOT USE)
C
NC
USE C dc NC
ROUTED ALARM
DC12-48-60—RM
ROUTED TO TELCO
ALARM BIOCK
N.T.S.
N.T.S.
.�
at&t
� 188 INVERNESS DRNE WEST
SUITE 400
ENGLEWOOD, CO 80712
�.
BLACK & VEATCH
304 INVERNESS WAY SOUTH
SUITE 400
ENGLEW000, CO 80112
P� GNG PRFPARED BY:
CSAI
CHARLE8 STECKIY ARCHfTEGTURE� Ine.
ARCHITEClURE - PLANNING - DESIGN
5935 SOUTH ZANG STREET. SU17E 280
LITTIETON, COLORADD 80127
OFFlCE 303.932.9974
FAX: 303.932.8581
PRWECT N0: COU4068
DRAWN BY: SGP
CHECKED BY: CS
CD 195UE
h/f� � `� •
•
• �
; 32097 ;
•
'�1JN 0 8 20,����
_.�r:"r•....•�,c\ c�
DEIVNIS GREVEL, P.E.
1 23 1 1 WESi PREN'nCE PLACE
Urr�eroN, Co�ow�o 80127
PHONE: 303.478.3337
SITE NAME:
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL, CO 81657
LTE—ROOFTOP
SHEET TRLE:
ELECTRICAL DC
SURGE PROTECTOR
DIAGRAM
SHEEi NUMBER:
�~ 1
m
a'
c�
N
�
U
>�
mv
�Q
��
��
m�
��
�
�.�
aW
N �
��
f �
��-' at&t
�
188 INVERNESS DRNE WEST
SUIiE 400
ENGLEWOOD, CO 80112
�.
BLACK & VEATCH
304 INVERNESS WAY SOUTH
SUITE 400
ENGLEWOOD, CO 80112
CSAi
GHARLBi STECKLY ARCNITECTURE� Inc.
ARCHIiECNRE — PLANNING — DESIGN
5935 SOU7H ZANG STREET, SU17E 280
LITTLETON, COLORADO BOt27
OFFlCE: 303.932.9974
FA%: 303.932.6561
PRQIECT N0: COU4086
DRAWN BY: SGP
CHECKED BY: CS
0 oe/oe/iz co ssu¢
� s/zs/iz co �Ew
iav a�re orscwmoN
LICENSU O:
JUN 0 � 201?
GONSLILTANT:
�uITE NAME:
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL, CO 81657
LTE—ROOFTOP
SHEET TRLE:
SITE
PLAN
G� �
3
�_
U
N
O
UE
> ,if
��
�Q
W
J O
� N
r� r
� O
C
�
. �
ao
N �
h Q
�a
��`�' at&t
�
788 INVERNESS DRNE WEST
SUITE 400
ENGLEWOOD, CO 80112
�.
BLACK & VEATCH
304 INVERNESS WAY SOUTH
SUITE 400
ENGLEWOOD, CO 80112
CSAI
GHARLES STECKLY ARGHf76GTURE� Ine.
ARCHITECTURE — PLANNINC — DESGN
5935 SOU7H ZANG S7REET, $UIIE 280
urneroN, caax�oo eois�
OFflCE 303.932.9974
FA%: 303.9328581
PROJECT N0: COU4088
DRAWN BY: SGP
CHECKED HY: CS
.IUN 0 � 201?
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL, CO 81657
LTE—ROOFTOP
SHEE7 TfiLE:
EQUIPMENT
SHELTER
FLOOR PLAN
SHEET NUMBER:
C� � • �
3 -
a
C!
�
UE
>�
�m'°
3{�Q
F� N
J �
� N
�'1 .
m n
�o
�
a�N
� Q
fa
; ;g �p : s � � 'v' a
� ) ANTENNAS2) �E) OMNI ?- � � �, V V E �` i
REPLACE E ANTENNAS ��
W/ NEW RE: C-3 I ,..a ��� I tl ���
II �E� PANEL ANTENNAS '�..I
�� �a��'" t_ Z_ � ' �::
�� (E) BUILDING
Z �,a� -- �.F-___ _
� � ��
� ,
U W
N
L? �f
° � § ��� �������
o�m
I
M d O
o ~
� o
I
O N
io
M
U H EL VA ION
SCALE: 8' 4' 0 8'
ire• = r-a
REMOVE (2) (E) OMNI
ANTENNAS
REPLACE (E) ANTENNAS REPLACE (E) ANTENNAS
W/ NEW RE: C-3 II II W/ NEW RE: C-3
II
(E) PANEL ANTENNAS �I II
(E) PANEL ANTENNAS
(E) BUILDING �I �
u u
� (E) BUILDING
z z
z
� � � �
W y y W
�y � W � (E) CAGED
c� W " " W c� ACCESS LADDER
z N o o y z
9 0 � � o �
m � o o � �
o a "rn� 'oM, a o
~ o ~
0
o � � o
� �
N �1 •O�p N
M M
FI
2 EAST ELEVA710N SCALE: B� a• o s� �
��._��-0. WEST ELEVATION sca.e: e� a� o e�
1/8• - � �-0•
�
�, at&t
188 INVERNESS DRIVE WEST
SUIiE 400
ENGLEWOOD, CO 80112
�.
BLACK & VEATCH
304 INVERNESS WAY SOUTH
S�� ,�
ENGLEWOOD, CO 80112
CSAI
CMARLES STECKLY ARCHRECTURE� Inc.
ARCHITECTURE - PIANNING - DESIGN
seas soun� znNC sm�t, sui� zeo
urr�rora, caoR�no eoiz�
OFFlCE 303.9329974
FAX: 303.932.8581
PRQIECT N0: COU4066
DR4WN BY: SGP
CHECKm BY: CS
- o oe/ae/iz co �swc
� s/zs/i2 w �w
�v o�re oescrs�noH
ICEN N NO:
lUN 0 � 2012
CONSULTANT:
SITE NAME:
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL, CO 81657
LTE—ROOFTOP
SHEET TRLE:
ELEVATfONS
SHEET NIJMBER:
G��
rn
�"
�
�
UE
>�
��
Wa
J �
1 N
mo
� c
�
ao
N �
�Q
ga
PROPOSED ANTENNA AND TRANSMISSION
CABIE REQUIREMENT 1. DESIGN AND CONSTRUCTION OF ANiENNA SUPPORTS SHALL CONFORM TO
(E) PIPE MOUNT
DCISTING ACCESS TRANSAAISSION CABLE CURRENT ANSI/TIA-222 OR APPLICABIF LOCAL CODES.
LADDER W/ CAGE SECTOR ANTENNA NPE TECHNOIOGY Z, qLL STE0. MATERIALS SHALL BE GALVANIZED AFfER FABRICA710N IN ACCORMNCE
(E) ANTENNAS BY OTHERS QT'. LENGTH NPE y�� p�M A123 'ZINC (HOT-DIP GALVANRED) COATINGS ON IRON AND SiEF1
A1 EXISTING UMTS 2 80' COAX PRODUCTS', UNLESS NOTED OTHERWISE.
(E) GPS ,q2 FUTURE TBD - - _ 3. ALL BOLTS, ANCHORS AND MISCELLANEOUS HARDWARE SHALL BE GALVANIZED IN
ACCORDANCE WITH ASTM A153 'ZINC-COATING (HOT-DIP) ON IRON AND STEEL
DCISTING A/C UNRS A3 FUTURE TBD - - - HARDWARE', UNLESS NOTED OTHERWISE.
(7yp� (2) (E) AT&T 4. DAMAGED GALVANIZED SURFACES SW�LL BE REPAIRED BY COLD GALVANIZING IN
OMNI A4 PROPOSED LTE�GSM 2 100' COAX ACCORDANCE WfTH ASTU A780.
ANTENNAS
B� EXISTING UMTS 2 80' COAX 5. ALL ANTENNA MOUNTS SHALL BE INSTALLED WfTH LOCK NUTS, DOUBLE NUTS AND
A� g2 FUTURE TBD - - _ SHALL BE TORQUED TO MANUFACTURER'S RECOMMENDATIONS.
6. CONTRACTOR SHALL INSTALL ANfENNA PER AIANUFACTURER'S RECOMMENDATION
� 63 FUTURE TBD - - - FOR INSTALLATION AND GROUNDING.
84 PROPOSED LTE/GSM 2 100' COAX �• � UNUSED PORTS ON ANY ANTENNAS SHAtl. BE TER111NATED WITH A 50-OHIA
LOAD TO ENSURE ANTENNAS PERFORM AS �ESIGNm.
C1 EXISTING UMTS 2 80� COAX 8. PRIOR TO SEffING ANTENNA AZIMUTHS AND DOWNTILTS, ANTENNA CONTRACTOR
SHAI.L CHECK THE ANTENNA MOUNT FOR TIGHTNESS AND ENSURE THAT THEY ARE
C2 FUTURE TBD - - - PLUMB. ANTENNA AZIAIUTHS SHALL BE SEf FROM TRUE NORTH AND BE ORIENTED
WITHIN +/- SZ AS DEFlNED BY THE RfDS. ANTENNA DOWN'fILTS SHALL BE
C3 FUTURE TBD - - - WITHIN +/- 0.57. 0.S DEFlNED B`( THE RfDS. REFER TO ND-00246.
O B� C4 PRROPOSED LTE/GSM 2 100' COAX 9. JUMPERS FROM THE TMA'S MUST TERMINATE TO OPPOSITE POURIZATION'S IN
DCISTING CABLE TRAY EP�CH SECTOR.
NOTE: 10. CONTRACTOR SHALL RECORD THE SERIAL �, SECTOR, AND POSITION OF EACH
CONTRACTOR IS TO BUILD THE RF PORTION fROM THE FINAL ACTUATOR INSTALLED AT THE ANTENNAS AND PROVIDE THE INFORMATION TO AT&T.
CON5fRUCTION RFDS. ��, 7Mq'S SW1LL BE MOUNTED ON PIPE DIRECfLY BEHIND ANTENNAS AS CLOSE TO
ANTENNA AS FEASIBLE PREFERABLY IN A VERTICAL POSRION.
12. ANTENNAS SW�LL HAVE A 4' MIN CENTER TO CENTER HORIZONTAL SEPARATION.
EXISTING FlXED LADDER
C3
TORQUE REQUIREMENTS:
1. ALL RF CONNECTIONS SHALL BE TIGHTIIJED BY A TORQUE WRENCH.
EXISTING ANTENNAS ��
ATTACHED TO 2. ALL RF CONNECTIONS, GROUNDING HARDWARE AND ANTENNA HARDWARE SHALL
PENTHOUSE W/ STAND B3 HAVE A TOROUE MARK INSTALLED IN A CANTINUOUS STRAIGHT L1NE FROM BOTH
OFF FR4ME (1YP)
SIDES OF THE CONNECTION.
2A RF CONNECTION BOTH SIDES OF THE CONNECTOR.
IXISTING GPS ANTENNA � 2.6. GROUNDING AND ANTENNA HARDWARE ON THE NUT SIDE STARTING FROM iHE
THREADS TO THE SOLID SURFACE. EXAMPLE OF SOIJD SURFACE: GROUND
, BAR. ANTENNA BRkCKET METAL.
��� �. .'3 ALL. 8M ANTENNA HAROWARE SHALL BE i1GHTENED TO 9 LB-Ff (12 NM).
N�TM L;�g�/ C 4. ALL 12M ANiENNA HARDWARE SHALL BE 11GHTENED TO 43 LB-fT (58 NM).
3 EXISTING AN7ENNA PLAN SCAI.E: q� 2� 0 4' ��A•� '! 5. ALL GRWND GROUNDING FWRDWARE SHALL BE TIGHTENED UNTIL THE LOCK
t/4• = T-0• "�r �,, ' �' WASHER COLLAPSES AND THE GROUNDING HARDWARE IS NO LONGER LOOSE.
�,,�y,� ,,- 6. ALL DIN TYPE CONNECiIONS SHALL BE TIGHTENED TO 18-22 lB-FT (24.4 -
29.8 NFA).
� a°' A� �� 7. ALL N TYPE CONNECiIONS SHALL 8E TIGHTENED TO 15-20 LB-IN (1 J- 2.3
`� NM).
EXISTING ACCESS
LADDER W/ CAGE P�e��' FIBER & POWER CABLE MOUNTING NOTES:
�' i. THE OPTIC FlBER TRUNK CABLES SHALL BE INSTALLED INTO CANDURS, CHANNEL
CABLE TRAYS, OR CABIF TRAY. WHEN INSTAWN� OPT1C FlBER TRUNK GABLES INTO
REPLACE ANTENNA A CABLE TRAYS SYSTEM, THE OPTIC FlBER TRUNK CABLES SHALL BE INSTALLED
ATTACHED TO INTO AN INTER DUCT AND PARTRION BARRIER SHALL BE INSTALLED BEfWEEN THE
PENTHOUSE W/ (E) 600 VOIT CABLES AND THE IN1ER DUCT IN ORDER TO SEGREGATE CABLE iYPES.
DCISTING A/C UNRS STAND OFF MOUMT OPT1C FlBER TRUNK CABLES SW�LL HAVE APPROVED CABLE RESTRAINTS EVERY
��) �T�) (60) SIXTY FEEf AND SECURELY fASTENm TO THE CABLE TRAY SYSTEM. NFPA 70
(NEC) ARTICLF 770 RULES SHALL APPLY.
NEW D/C POWER & REMOVE (2) 2. THE TYPE TC-ER CABLES SHALL BE INSTALLED INTO CONDUfTS, CHANNEL CABLE
FlBER TO FOLLOW (E) qq (E) ATkT OMNI TRAYS, OR CABLE TRAY AND SWU.L BE SECURED AT INTERVALS NOT IXCEEDING
CABLE TRAY ANTENNAS (6) SIX FEET. AN EXCEPTION; WHERE TYPE TC-ER CABLES ARE NOT SUBJECT TO
PHYSICAL DAMAGE, CABLES SHALL 8E PERMITTED TO AIAKE A TRANSITION BEfWEEN
NEW FC12 O COAX '°`� CONDUITS, CW�NNEL CABLE TR4YS, OR CABLE TRAY WHICH ARE SERVING
ATRY PORT O GRADE UTIIJZATION EQUIPMENT OR DEYICES, A DISTANCE (6) SIX fEET SHALL NOT BE
RE: 5/C-6 IXCEEDED WITHOUT CONTINUOUS SUPPORTING. NFPA 70 (NEC) ARiICLES 336 AND
NEW COVERED CABLE
392 RULES SHALL APPLY.
TR4Y ON IXISTING ROOF 3. WHEN INSTALLING OPTIC FlBER 1RUNK CABLES OR TYPE TC-ER CABLES INTO
RE: 3/C-6 CONDUITS, NFPA 70 (NEC) ARTICLE 300 RULES SHALL APPLY.
NEW SURGE PROTECTOR, �
(s) RRHS, & (s) B� GENERAL NOTES:
TRIPLEXERS ATTACHED
TO INSIDE OF IXISi1NG O 1. IT IS THE CONTRACTORS RESPONSIBILfTY TO VERIFY ANTENNA, TMAS, DIPLEXERS,
A/C SCREEN RE: 1/C-5 -y� � AND COAX CONFlGURATION, MAKE AND MODELS PRIOR TO INSTALLAf�ON.
�G 2. ALL CONNECTIONS FOR HANGERS, SUPPORTS, BRACING, EfC. SFWLL BE INSTALLED
�, PER TOWER MANUfACTURER'S RECOMMENDATIONS.
NEW LTE GPS ANTENNA 3. CANTRACTOR SHALL REFERENCE THE TOWER 5fRUCTURAL ANALYSIS/DESIGN
10'-0' AWAY FROM (E) DRAWINGS FOR DIRECTIONS ON CABLE DISTRIBUTION/ROUTING.
GPS MIN. RE: 3,4/C-5 4. ALL OUiD00R RF CONNECTORS/CONNECTIONS SHALL BE WEATHERPROOFED, D(CEPT
C4 THE REf CONNECTORS, USING BUTYL TAPE AFTER INSTALLATION AND FlNAL
IXISTING FlXED LADDER CONNECTIONS ARE MADE. BUM TAPE SHALL HAVE A MINIIAUM OF ONE-WJF TAPE
WIDTH OVERLAP ON EACH TURN AND EACH IAYER SHALL BE WRAPPED iHREE
TIMES. WEATHERPROOFlNG SHALL � SMOOTH WITHOUT BUCKLING. BUTYL BLEEDING
REPLACE ANTENNA �� REPLACE ANTENNA
IS NOT ALLOWED.
ATTACHED TO ATTACHED TO 5. IF REQUIRED TO PAINT ANTENNPS AND/OR COAX:
STANDOOFF MOUNT, (TYP) ��'�,P�� B4 STp DOOFF �AOUNT, (lYP) SA TEAIPERATURE SHALL BE ABOVE 50'
� � S.B. PAINf COLOR MUST BE APPROVED BY BUILDING OWNER/UNDLORD.
5.C. FOR REGULATED TOWERS, FM/FCC APPROVED PAINT IS REQUIRED.
NORTH 5.D. DO NOT PAINT OVER COIAR CODING OR ON EQUIPMENT MODEL NUMBERS.
SCALE: 4' 2' 0 4'
2 PROPOSED ANTENNA PLAN ��4. _�,-0, i RF DATA
. � at&t
�
188 INVERNESS DRNE WEST
SUIiE 400
ENGLEWOOD, CO 80112
�.
BLACK & VEATCH
304 INVERNESS WAY SOUTH
SUITE 400
ENGLEWOOD, CO 80112
CSAi
GHARLES STECKLY ARCHITECTURE� Inc.
ARCHITECTURE - PLANNINC - DESIGN
5935 SOUTH ZANG 57REET, $UIIE 280
urnerora, caoR�no eoiz�
OFFlCE: 303.932.9974
FAX: 303.932.8581
PROJECT N0: COU4088
DRAWN BY: SGP
CHECKm BY: CS
0 oe/oe/�s co �ssue
A 5/25/12 CD REMfly
� wh ocscAVnon
Lic No:
�,un� o � 2naz
'� CONSULTANT:
SRE NAME:
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL, CO 81657
LTE-ROOFTOP
ANTENNA
PLANS
G��
m
e.
�
�
UE
>�
�m'°
3Q
J �
% N
m r
�o
c
�
�
ao
N �
��
�a
NOTES:
t. SPACING BETWEEN EQUIPMENT WITHIN THE LTE RACK SHALL gE ONE RACK UNR (OR
APPROX�MATELY 3'�.
. `�� '
��� �i,��� � '1! �
y���. ,���--
. , ���� .� �.
-���E..�: �-°�_
��('JI �
>�'Oj `O e PROPOSED INDOOR
LINEAGE POWER
GROUND DISTRIBUTION FRAME
BAR a
�,Y� D O
DC6-48-60—RM oo D PROPOSED RECTIFIERS
SURGE
PROTECTION
: v� BB �• •
LTE BBU
GPS -- o FUTURE GROWTH
SURGE RECTIFIERS
PROTECTION
FlBER
CABLE TRAY
eAM ALARM
MODULE oa
0
O °
� �
00
J L
BATTERY SPECIFlCATION
(ABSOLYTE) EACH MODULE HAS AN ELECTROLYTE CAPACfTY OF 3.25 GALLONS EACH. THERE ARE
2 BATTERY CELLS PER MODULE. (12) MODULES PROPOSED IN THIS OCCUPANCY, RESULTING IN
AN AGGREGATE ELECTROLYTE VOLUME OF 39 GALLONS. PER SECTION 608.1 SCOPE. — OF THE
2009 IFC — STATIONARY STORAGE BATfERY SYSTEMS HAVE & ELECTROLYTE CAPACIN OF MORE
THAN 50 GALLONS SHALL COMPLY WITH SECTION 608.
3 NOT USED N.T.S. 2 LTE DETAIL N.T.S. 1 LINEAGE DETAIL N.T.S.
u * at&t
�
188 INVERNESS DRNE WESi
SUIlE 400
ENGLEWOOD, CO 80112
�.
BLACK & VEATCH
304 INVERNESS WAY SOUTH
surcE aoo
ENGLEWOOD, CO 80712
CSAI
CMARLES STEGK�Y ARCNfTECTURE� Inc.
ARCHI7ECTURE — PLANNING — DESIGN
5935 SOUTH ZANG S7REET, SUIIE 280
urr�rarr, co�oR�no eoiz�
OFFlCE: 303.932.9974
FAX: 303.932.8581
PRQIECT N0: COU4086
DRAWN BY: SGP
CHECKED BY: CS
0 oe/ae/iz co issue
A S/2S/12 CD REVIEW
fffV b1TE DFSCRPiIq!
LICENS E O:
dIUN � � 2D1�
CONSULTANT:
SITE NAME:
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL, CO 81657
LTE—ROOfTOP
SHEET TITLE:
EQUIPMENT
DETAILS
SHEET
G��
3 '
�
N
�
cE
>�
�p
�Q
J �
� N
M .
mno
� c
�
�
a io
N �
��
�a
MINIMUM OF 757. OR
270' IN ANY DIRECTION COAX ENTRY SEAL
(INSTALLED BY
PROPOSED FlF RACK GPS GENERAL �Z�
CONTRACTOR) �MW� o
COAX CABLE
PROPOSED 1/2"4 KWIK BOLT o O O O oO o�HA
3 ANCHOR WffH 3 1/4" EMBED. -
s , , :,
OOOO�B�`"
y � W� PROPOSED 2"—SQUARE O O O O o��
� m �' GALVANIZED STEEL SHIM PLATE
�� M w� WHERE REQUIRED TO LEVEL GPS (SEE OBSTRUCTIONS MUST
� � E Q U I P M E N T NOTES 5& 6) BE BELOW 15' O O O a�� R E
o -
U � GQ�
EXISTING SHELTER FLOOR
6 INDOOR EQUIPMENTTO CONC. SLAB AIVCHORAGE N.r.s. 4 GPS MIN. SKY VIEW REQUIREMENTS N.T.S. 2 COAX ENTRY PORT DETAIL N.rs.
NOTES
1. THE ELEVATION AND LOCATION OF THE GPS ANTENNA SHAIL BE IN ACCORDANCE WITH
THE FlNAL RF REPORT.
2. THE GPS ANTENNA MOUNT IS DESIGNED TO FASTEN TO A STANDARD 1-1/4" DIAMETER,
SCHEDULE 40, GALVANIZED STEEL OR STAINLESS STEEL PIPE. THE PIPE MUST NOT BE
THREADED AT THE ANTENNA MOUNT END. THE PIPE SHALL BE CUT TO THE REQUIRED
LENGTH (MINIMUM OF 18 INCHES) USING A HAND OR ROTARY PIPE CUTfER TO ASSURE
. A SMOOTH AND PERPENDICULAR CUT. A HACK SAW SHALL NOT BE USED. THE CUT PIPE
END SHALL BE REAMED AND SMOOTH EDGES IN ORDER TO SEAL AGAINST THE
NEOPRENE GASKET ATTACHED TO THE AMENNA MOUNT.
.:,����/ EXISTING BULJDING PARAPEf
�`" �I%.! 3. IT IS CRfTICAL THAT THE GPS ANTENNA IS MOUNTED SUCH THAT IT IS WffHIN 2
�,� � � DEGREES OF VERTICAL AND THE BASE Of THE ANTENNA IS WITHIN 2 DEGREES OF
� � � LEVEI.
� ° ��-� n //� � PROPOSED RRH dc SURGE
F�.,� � V�,� ,�Y � 4. DO NOT SWEEP TEST GPS ANTENNA. PROTECTION (BEYOND)
��� W�, � (1) PROPOSED 1/4" 1 PAIR FIBER ATTACHED TO BACK OF
� CABLE ROUTED FROM PROPOSED RRH PA�� ����
.y l•
TO PROPOSED DC2-48-60-0-9E
� SURGE PROTECTION UNfT (TYP)
(1) PROPOSED 3/8" DC POWER
CABLE ROUTED FROM PROPOSED RRH
PROPOSED GPS ANTENNA TO PROPOSED DC2-48-60-0-9E
SURGE PROTECTION UNIT (TYP)
PROPOSED
DCISTING BULIDING ANTENNA (TYP)
PROPOSED GPS ANTENNA MOUNT PROPOSED 1/2' COAX JUMPER
ANDREW P/N MTC2103 OR
APPROVED EQUNALENT �)
PROPOSED AISG CABLE (TYP)
EXISTING STRUCTURE
SECURE TO WALL
USING (4) BOLTS
GROUND KIT
1/2" COAX CAg�E g" MINIMUM
BENDING RADIUS PER CABLE
MANUFACTURER'S SPECIFICATIONS
5 NOT USED N.r.s. 3 LTE GPS ANTENf�tA MOUfVTING N.T.S. l ANTEIVNA MOUfVTING N.T.S.
� � � � at&t
�
188 INVERNESS DRNE WEST
SUITE 400
ENGLEWOOD, CO 80712
�.
BLACK & VEATCH
304 INVERNESS WAY SOUTH
SURE 400
ENGLEWOOD, CO 80112
CSAI
GNARLES STEGKLY ARCHREGTURE, Inc.
ARCHIlEClURE - PLANNING - DESIGN
5935 SOUTH ZANG SIREET, SUIlE 280
umFron, caoR�oo eo�z�
OFFlCE: 303.9329974
FA%: 303.9328581
PROJECT N0: COU4086
DRAWN BY: SGP
CHECKm BY: CS
o ro/oe/�s co awe
� s/ss/�2 co �nEw
rsEV are
Li 5 0:
.iUN 0 � 2012
ONSULTANT:
NAME:
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL, CO 81657
LTE—ROOFTOP
EQUIPMENT
D ETAI LS
c��
3
v
�
m�
>
�v
a
J �
1 N
NI .
r� n
�o
�
��
0
N �
� �
�a
RAYCAP DC2-48-60-0-9E NOTES (WALL ATTACHMENT� NOTES (WALL ATTACHMENT)
NOMINAL OPERATING VOLTAGE: 48 VDC 1. CONCRETE 1, CONCREfE
ANCHOR: HILTI HIT HY 150 ADHESIVE ANCHOR ANCHOR: HILTI HIT HY 150 ADHESIVE ANCHOR
NOMINAL DISCHARGE CURRENT: 20 kA 8/20µs SIZE: 0= 3/B' SIZE: W= 3/8'
EMBEDMENT: 1 3/4' EMBEDMENT: 1 3/4'
MAXIMUM DISCHARGE CURRENT: 60 kA 8/20µs SPACING: S= 8' (MIN) SPACING: S= 24" (MAX)
• IF THE WALL THICKNESS IS LESS THAN 2', THE 1/2"0 A325 BOLT SHALL BE USED TO GO THROUGH THE WALL
MAXIMUM CONTINUOUS OPERATING VOLTAGE: 75 VAC, 100 VDC ' IF TNE WALL THICKNESS IS LESS THAN 2', THE 1/2"0 A325 BOLT W�}{ A 3/8' BACK PLATE INSIDE OF THE WALL.
VO�TAGE PROTECTION RATING: 500 V SHALL BE USED TO GO 2. FULLY—GROUTED CMU WALL
THROUGH THE WALL WfTH A 3/8" &4CK PLATE INSIDE OF THE ANCHOR: HILTI HIT HY 150 ADHESIVE ANCHOR
TOTAL WEIGHT: 16 Ibs WALL SIZE: 0= 3/8"
ANCHOR BOLT 2, F� I Y— .RO �D .M � W� I EMBEDMENT: 1 3/4'
(SEE NOTES) ANCHOR: HILTI HIT HY 150 ADHESIVE ANCHOR SPACING: ONE (1) ANCHOR PER CELL (MAX) AND 8" (MIN)
3. SOLID BRICK WALL
6.29° SIZE: �= 3/8' ANCHOR: HILTI HIT HY 20 ADHESNE ANCHOR
EMBEDMENT: 1 3/4' SIZE: 0= 3/8' '" ''
�_ -- -- SPACING: ONE (1) ANCHOR PER CELL (MAX) AND 8" EMBEDMENT: 2" �~V �� �
_ ------
MIN . SPACING: S = 24" (MAX) �
3. SOLID BRICK WALL 4. HOLLOW. UNGROUTED CMU WAI.L k BRICK WALL WRH HOLES I�' �-� ` t
ANCHOR: HILTI HIT HY 20 ADHESNE ANCHOR �CHOR: NILTI HIT HY 20 ADHESNE ANCHOR .J 1
SIZE: 0 = 3/8' � Z '� % ��
o ' SIZE: 0= 3/8' EMBEDMENT: THROUGH FACE OF HOLLOW BASE Z 6' (MIN} -- �
'� , �� EMBEDMENT: 2" SPACING S=(2) COMPLETE BRICKS IN ANY DIREC110N
^ ! 4. HOLLOW. UNGROUTED CMU WALL & BRICK WALL WITH HOLES 5 STEEL (1) ANCHOR PER BLOCK CELL (CMU) ��...__—_,»»---s—�
j ANCHOR: HILTI HIT HY 20 ADHESNE ANCHOR 80LT: A325 Q�
SIZE: 0= 3/8' BOLT SIZE: 0= 1/2" '
_ - EMBEDMENT: THROUGH FACE OF HOLLOW BASE Z 6` BOLT HOLE SIZE: 0= 9/16'
° (MIN)
SPACING: S=(1) ANCHOR PER BLOCK CELL (CMU) 6. IF THE WALL MATERIAL IS DIFFERENT FROM ABOVE, CONTRACTOR SHALL INFORM DESIGN ENGINEER IMMEDIATELY.
10.38" 7, AL.L HARDWARE AND PARTS SHALL BE HOT—DIPPED GALVANIZED WITH IOCK WASHERS AND HEAVY HIX NUTS.
5� ��- 8. ALL BOLT HOLES SHALL BE 7/16"0 UNLESS NOTED OTHERWISE.
BOLT: A36 g, 7FiE MAX LOAD BETWEEN ANCHORS SHALL BE LESS THAN 400 POUNDS.
BOLT SIZE: 0 = 1/2�
RAYCAP FC12—PC6-10E BOLT HOLE SIZE: 0= 9/16'
TOTAL WEIGHT: 20.35 Ibs 6. IF THE WALL MATERUIL IS DIFFERENT FROM ABOVE. CONTRACTOR 0 0 �
SHALL INFORM DESIGN ENGINEER IMMEDIATELY.
16.245" 6.642' 7• �- HARDWARE AND PARTS SFIALL BE HOT—DIPPED GALVANIZED � Q � o
WITH LOCK WASHERS AND HEAVY HD( NUTS. o /
8. ALL BOLT HOLES SHALL BE 7/16"0 UNLESS NOTED OTHERWISE. 0
— � 0
- — 0
Q Q UNISTRUT MOUNTING
B � 0 � BRACKEf P/N
P3000HS WITH
'o� � �I� o p � � P1012S CHANNEL
� 4 p p NUTS OR EQUIVALENT
� � / ° � �)
i•
0 °
— � 0 �
p ATdcT RRU
/ 0 Q MOUNTING PIATE
0 Q
BOLT AT 2'-0�
� p SPACING (SEE
NOTES)
5 R.4YCAP EQUIPMENT SPECIFICATIONS N.T.S. 2 RRH MOUNTING PLATE N.T.S.
RAYCAP DC6-48-60—RM
NOMINAL OPERATING VOITAGE: 48 VDC
SOUD FLANGED TOP
NOMINAL DISCHARGE CURRENT: 20 kA 8/20ms ALCATEL—LUCENT 9442 RRH2x40-07—L
COAX
MAXIMUM DISCHARGE CURRENT: 60 kA 8/20ms DIMENSIONS, WxDxH: (10.63"x9.7"x19.3")
COMBINATION COVER & HOLD 270x247x490mm
MAXIMUM CONTINUOUS OPERATING VOLTAGE: 75 VDC DOWN CLAMPS
VOLTAGE PROTECTION RATING: 400 V 'B—LJNE' CABLE TRAY WEIGHT, WITHOUT BRACKETS: 52.4 Ibs
(LADDER TYPE) OR EQUAL
TOTAL WEIGHT: 53 Ibs PVC SLEEPER W/ W BLOCK
O 36" O.C.
�u (1) LAYER SPM ISOLATION
I I
MEMBRANE (ROOF MOUNTS)
(E) ROOF / (E) GRADE � �
o r —_ -
, ,�.._ - �
NOTES: � � �"
1. FOR CABLE TRAY MOUNTED TO VERTICAL WALLS: ' -_
i
A HORIZONTAL RUN — ATfACH TO (E) WALL O 24" O.C. i� — REMOTE RADIO
B. VERTICAL RUN — ATfACH UNISTRUT TO WALL O 48' O.C. !{- : `*� HEAD UNIT
RE: NOTE 'B' BELOW. j 4�. ` �--_
2. ATfACHMENTS: USE ANCHORS APPROPRIATE FOR MOUNTING SURFACE. '� _
� »�� A MASONRY CONDITIONS: 1/4" MASONRY ANCHORS. 2 1/2" PENEfRATION. i � �
'? B. WOOD CONDITIONS: 3/8" LAG BOLTS, 2 1�2' PENETRATION IN STUDS. " :F �.; a
"� C. MTL STUDS: �j10 TEK SCREWS � AAA)( 24 O.0 BOTH HORIZ dc VERT. ��s:.��-="
4 ANTENNA SPECIFICATIONS N.rs. 3 CABLE TRAY DE7AIL N.T.S. 1 RRH SPECIFICATIONS N.T.S.
� at&t
�
188 INVERNESS ORIVE WEST
SUITE 400
ENGLEWOOD, CO 80112
�.
BLACK & VEATCH
304 INVERNESS WAY SOUTH
SUITE 400
ENGLEWOOD, CO 80172
CSAI
CMARLE8 STECKLY ARGHR6GTURE. Inc.
ARCHITECTURE — PLANNING — DE9GN
sass souni vwc srn�r, sui� 2eo
urnEror+, caaR�na eo�2�
OFFlCE 303.932.9974
FAX: 303.932.8587
PROJECT N0: COU4088
DRAWN BY: SGP
CHECKED BY: CS
0 oe/ae/iz co �
� s/ts/ix cn r�ntw
r�v o�h
E No:
��IY o p 2��4
ONSULTANT:
SITE NAME:
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL, CO 81657
LTE—ROOFTOP
SHEET TRLE:
EQU[PMENT
D ETA1 LS
SHEET NUMBER:
G�6
3•
�
c�
0
UE
>�,
3�
a
H N
J O
� N
myo
� L
�
ao
N W
��
�a
GROUNDWG PLAN
jjOTFC•
1.) ALL WORK IS EXISTING U.N.O.
2.) ALL NON-AFFECTED EQUIPMENT EXCLUDED FOR
CLARfTY.
MGB
3
2Y
IAl1
IALO
ING
� �`; . .
_p �I�,,
� O �
��� .
�
JDING BAR, EXTEND (2)
NNED CU CONDUCTORS
2 GROUNDING BAR &
ECHANICAL CONNNECTION
ACK
�2)
'S TO
7
�E
LEGEND
• EXOTHERMIC
■ COMPRESSION TYPE CONNECTIONS
---- GROUNDING CONDUCTOR
�� GROUNDING BAR
e CHEMICAL ELECTROLYTIC GROUNDING SYSTEM
�I� GROUND ROD WRH INSPECTION SLEEVE
�I�T TEST GROUND ROD WITH INSPECTION SLEEVE
� DCOTHERMIC WITH INSPECTION SLEEVE
�
NoR-M
NOTES
1. GROUNDING IS SHOWN DIAGRAMMATICALLY ONLY. FOR GROUNDING OETAILS SEE THE FOLLOWING G
PAGES
2. CONTRACTOR SHALL HAVE A COMPLEfE UNDERSTANDING OF THE CONTENTS Of AT&T
STANDARD TP-76416.
3. THE CONTRACTOR SHALL SUPPLY AT&T WITH THE RESULTS FROM PRE-CONSTRUCTION AND POST-
CONSTRUCTION OHM TESTING (GROUNDING) RESULTS ON ALL MODIFlED CELL SITES AND AS
REQUIRED BY AT&T GROUNDING & BONDING STANDARD TP-76416.
4. THE CONTR4CTOR SHALL BE RESPONSIBLE TO PROVIDE TWO APPROVED 'FALL Of POTENTIP,L"
TESTS. THE FIRST WILL BE CONDUCTED PRIOR TO MAKING CONNECTIONS AND THE SECOND WILL
BE CONDUCTED AFTER THE FlNAL CONNECTIONS HAVE BEEN MADE TO PROPOSED EQUIPMENT, THE
SUPPLEMENTAL GROUNDING SYSTEM, AND THE EXISTING GROUNDING SYSTEM. THESE TESTS SHALL
BE PERFORMED BY A QUALIFlED AND CERTIFlED TESTING AGENT. PROVIDE INDEPENDENT TEST
RESULTS TO THE PROJECT MANAGER FOR REVIEW. THE GROUNDING SYSTEM RESISTANCE TO EARTH
GROUNDING SHALL NOT EXCEED (5) OHMS. IF THE GROUNDING TEST IXCEEDS THE MAXIMUM OF
(5) OHMS, THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDE ADDITIONAL GROUNDING RODS
AND CONNECTIONS AS REQUIRED TO MEET THE (5) OHMS MAXIMUM.
5. THE INSPECTOR HAVING JURISDICTION SHALL INSPECT ALL GROUNDING CONNECTIONS FOR
TIGHTNESS. EXOTHERMIC WELDED CONNECTIONS SHALL BE APPROVED BEFORE BEING PERMANENTLY
CONCEALED.
6. CONTRACTOR SHALL PROVIDE STRNN-RELIEF AND CABLE SUPPORTS FOR ALL CABLE ASSEMBLIES,
COAX CABLES, AND REf CONTROL CABLES. CABLE STRA�N-RELIEFS AND CABLE SUPPORTS SHALL
BE APPROVED FOR THE PURPOSE. INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURER'S
SPECIFlCATIONS AND RECOMMENDATIONS.
7. CONTRACTOR SHALL GROUND ALL EQUIPMENT INCLUDING ANTENNAS, REMOTE RADIO HEADS, REf
MOTORS, TMA'S, COAX CABLES, AND REf CONTROL CABLES AS A COMPLETE SYSTEM. GROUNDING
SHALL BE EXECUTED BY QUALIFlED WIREMEN IN COMPLIANCE WITH MANUFACTURER'S
SPECIFlCATIONS AND RECOMMENDATIONS.
8. NUMBER OF GROUNDING BARS MAY VARY DEPENDING ON THE lYPE OF ANTENNA SUPPORTING
STRUCTURE, ANTENNA LOCATION, AND CONNECTION ORIENTATION. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR INSTALLING ADDRIONAL GROUNDING BARS AS REQUIRED, PROVIDING SOR SPARE
CONNECTION POINTS.
9. TESTING SHALL BE PERFORMED AT ALL SITES WHERE MODIFlCAl70NS OR ADDITIONS ARE MADE TO
THE DCISTING GROUNDING SYSTEM AND SHALL BE IN ACCORDANCE WfTH AT&T GROUNDING AND
BONDING STANDARDS TP-76416. THE CONTR4CTOR SHALL SUPPLY ATacT WITH RESULTS FROM
PRE-CONSTRUCTION AND POST-CONSTRUCTION OHM TESTING (GROUNDING) RESULTS AND BE IN
COMPLJANCE WITH AT&T GROUNDING AND BONDING STANDARDS TP-7fi416.
10. ALL PROPOSED GROUNDING BAR DOWNLEADS ARE TO BE TERMINATED TO THE EXISTING ADJACENT
GROUNDING BAR DOWNLEADS A MINIMUM DISTANCE OF 4'-0" BELOW GROUNDING BAR.
TERMINATIONS MAY BE EXOTHERMIC OR COMPRESSION.
11. ALL MAIN COAXIAL CABLES WILL BE GROUNDED WITH COAXUIL CABLE GROUNDING KITS AT THE
FOLLOWING LOCATIONS:
TOWERS
A. THE ANTENNA LEVEL
B. M�D LEVEL IF TOWER IS OVER 200'
C. BASE OF TOWER PRIOR TO TURNING HORIZONTAL
D. OUTSIDE THE EQUIPMENT SHELTER AT THE ENTRY PORT
E. INSIDE THE EQUIPMENT SHELTER AT THE ENTRY PORT
BUILDINGS
A. EACH ANTENNA SECTOR
B. ROOF LEVEL COAXIAL CABLE ENTRY PORT
C. OUTSIDE THE EQUIPMENT SHELTER AT THE ENTRY PORT
D. INSIDE THE EQUIPMENT SHELTER AT THE ENTRY PORT
GROUNDING NOTES
1. PLASTIC CLJPS SHALL BE USED TO FASTEN AND SUPPORT GROUNDING CONDUCTORS. FERROUS
MEfAL CLIPS WHICH COMPLEfELY SURROUND THE GROUNDING CONDUCTOR SHALL NOT BE USED.
2. TOWER GROUNDING BAR: EXTEND (2) �2 AWG TINNED CU WIRE FROM BURIED GROUND RING UP
TO THE TOWER GROUND BAR AND MAKE A MECHANICAL CONNECTION. SECURE GROUND BAR
DIRECTLY TO TOWER WITH STAINLESS STEEL MOUNTING MATERIAL.
3. ANTENNA GROUNDING BAR: ANDREW CORPORATION PART #UGBKIT-0424-T. MOUNT GROUND BAR
DIRECTLY TO TOWER. SECURE TO TOWER WITH STAINLESS STEEL MOUMING MATERIAL.
4. GROUNDING BAR: LOCATED CLOSE TO GRADE LOCK BOX TESSCO PART �351546: INSTALL PER
MANUFACTURER GUIDELINES.
5. DO N07 ALLOW THE COPPER CONDUCTOR TO TOUCH THE GALVANIZED GUY WIRE AT THE
CONNECTION POINT OR AT ANY OTHER POINT. NO EXOTHERMICALLY WELDED CONNECTION
SHALL BE MADE TO THE GUY WIRE.
6. ALL GROUNDING CONDUCTORS SHALL 8E �6 AWG COPPER TINNED UNLESS NOTED OTHERWISE.
7. ALL GROUNDING CONDUCTORS SHALL PROVIDE A STRAIGHT DOWNWARD PATH TO GROUND WffH
GRADUAL BEND AS REQUIRED. GROUND WIRES SHALL NOT BE LOOPED OR SHARPLY BENT.
8. KOPR-SHIELD ANTI-OXIDATION COMPOUND SHALL BE USED ON ALL COMPRESSION GROUNDING
CONNECTIONS.
9. ALL IXOTHERMIC CONNECTIONS SHALL BE INSTALLED UTIIJZING THE PROPER CONNECTION/MOLD
AND MATERWS FOR THE PARTICULAR APPLICATION.
10. ALL BOLTED GROUNDING CONNECTIONS SHALL BE INSTALIED WITH AN EXTERNAL TOOTHED LOCK
WASHER. GROUNDING BUS BARS MAY HAVE PRE-PUNCHED HOLES OR TAPPED HOLES. ALL
HARDWARE SW�LL BE SECURITY TORQUE HARDWARE 3/8' STPJNLESS STEEL.
11. EXTERNAL GROUNDING CONDUCTOR SfiALL NOT BE INSTALLED OR ROUTED THROUGH HOLES IN ANY
MEfAL OBJECTS, CONDUITS, OR SUPPORTS TO PRECLUDE ESTABLISHING A MAGNETIC CHOKE POINT.
12. CONTRACTOR SHALL REPAIR/PLACE EXISTING GROUNDING SYSTEAA COMPONENTS DAMAGED DURING
CONSTRUCTION AT THE CONTRACTORS EXPENSE.
at&t
�
188 INVERNESS ORNE WEST
SUIiE 40p
ENGLEWOOD, CO 80112
�.
BLACK & VEATCH
304 INVERNESS WAY SOUTH
SUITE 400
ENGLEWOOD, CO 80112
' CSAi
GMARLES STECKLY ARGHITECTURE� Ine.
ARCHITECTURE - PLANNING - DESIGN
saas souni znrac srn�r, sui� 2eo
urnFraa, caoR�oo eo�z�
OFFlCE: 303.932.9974
FAX: 303.9328581
PROJECT N0: COU4088
DRAWN 8Y: SGP
CHECKED HY: CS
�iUN 4 � 201?'
SRE
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL, CO 81657
LTE-ROOFTOP
SHEEi TITLE:
GROUNDING
PLAN
SHEET NUMBER:
� ~ �
W
3•
v
�i
C7
N
� E
>�
3�
'w
a
1- N
J �
% N
� .
m r
� O
�
aW
N �
��
�a
�
at&t
188 INVERNESS DRNE WEST
SUfTE 400
ENGLEWOOD, CO 80112
�.
BLACK & VEATCH
304 INVERNESS WAY SOUTH
SUITE 400
ENGIFNOOD, CO 80172
CSAI
;HARLES STHCKLY ARCHITECTURE� Inc.
ARCHITECTURE — PLPNNING — DESIGN
5935 SOU1H ZANG SIREET, SU11E 2B0
umEroN. caaR�oo eo�z�
OFFlCE: 303.932.9974
FA%: 303.9328581
PROJECT N0: COU4086
DRAWN BY: SGP
CHECKED BY: CS
,��� � � ��1�%
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL, CO 81657
LTE—ROOFTOP
GROUNDING
DETAILS
SHEET NUMBER:
��2
m
3�
a
vi
C7
�
UE
>�
�+ e
3Q
w
ra
J �
� N
m r
� O
�
ao
N W
�o
J
�a
N��
FnrH GROUNDING GONDUCTOR TERMIr1ATING ON ANY 2 AWG BARE TINNED SOLID COPPER CONDUCTORS TO GROUNDING BAR. ROUTE
rROUNDI1vG B.eR �FIe�L FLe�� AN IDENTIFICeTION TAG ATfAGHED 1• EXOTHERMIC WELD (2) TWO, �
NEWTON INSTRUMENT COMPANY, INC. AT EACH END TFLAT WI I IDENTIFY RS ORIGIN AND DE�NATION CONDUCTORS TO BURIED GROUNDING RING AND PROVIDE PARALLEL IXOTHERMIC WELD.
BUTNER, N.C.
2. ALL GROUNDING BARS SHALL BE STAMPED IN TO THE MEfAL "IF STOLEN DO NOT RECYCLE.' THE
NO REQUIRED PART NUMBER DESCRIPTION �F�TION "P" — SURGE PROTECTORS CONTRACTOR SHALL USE PERMANENT MARKER TO DRAW THE LINES BEfWEEN EACH SECTION AND LABEL EACH
SOLID GROUNDING (EC) CELL REFERENCE GROUNDING BAR (IF COLLOCATED) SECTION (�P�, "A', "N', "I�) WITH 1" HIGH LETTERS.
�i 1 1/4°x4'x48� � (EC) GENERATOR FRAMEWORK (IF AVAIIABLE) (�2 AWG)
3. ALL HARDWARE SHALL BE STAINLESS STEEL 3/8� DIAMETER OR IARGER. ALL HARDWARE 18-8 STPJNLESS
WALL MOUNTING (EC) TELCO GROUNDING BAR (#2 AWG) STEEL INCLUDING LOCK WASHERS, COAT ALL SURFACES WITH AN ANTI—OXIDANT COMPOUND BEFORE MATING.
O 2 A-6056 BRACKEf (EC) COMMERCIAL POWER COMMON NEUTRAL/GROUNDING BOND (3/0)
(EC) FIBER GROUNDING BAR (�2 AWG) 4. FOR GROUND BOND TO STEEL ONLY: INSERT A CADMIUM FLAT WASHER BETWEEN LUG AND STEEL. COAT ALL
O3 2 3061-4 INSUTATORS (EC) POWER ROOM REFERENCE GROUNDING BAR (�2 AWG) SURFACES WRH AN ANTI—OXIDANT COA�POUND BEFORE MATING.
(ATacT) RECTIFlER FRAMES
O 4 3012-1 5�8p—� � X� 5 GROUNDI GSTBUS. �� GROUNDING KIT AT A BEND AND ALWAYS DIRECT GROUNDING CONDUCTOR DOWN TO
H.H.C.S. cFr.TION "A" — SURGE ABSORBERS
OS 4 3015-8 5�8� (EC) INTERIOR GROUNDING RING (�2 AWG) 6. NUT & WASHER SHALL BE PLACED ON THE FRONT SIDE OF THE GROUNDING BAR AND BOLTED ON THE BACK
LOCKWASHER (EC) EXTERNAL E4RTH GROUNDING FlELD (BURIED GROUNDING SIDE. INSTALL BLACK HEAT—SHRINKING TUBE, 600 VOLT INSULATION, ON ALL GROUNDING TERMINATIONS. THE
RING) (�J2 AWG) INTENT IS TO WEATHERPROOF THE COMPRESSION CONNECTION.
(EC) MEfALLJC COLD WATER PIPE (IF AVAIIABLE) (1/0 AWG) 7, SUPPUED AND INSTALLED BY CONTRACTOR.
(EC) BUILDING STEEI (IF AV/ULABLE) (1/0 AWG)
(SEE NOTE 2) c��7�ON "N" — NON—ISOLATED GROUNDING ZONE EQLIPMENT 8• THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLING ADDRIONAL GROUNDING BAR AS REQUIRED,
PROVIDING 50R SPARE CONNECTION POIMS.
DOUBLE CRIMP (EC) MISC NON—ISOLATED GROUNDING ZONE
CONNECTION p EQUIPMENT (ATd�T)-48V POWER SUPPLY RETURN BARE 9. ENSURE THE WIRE INSULATION TERMINATION IS WITHIN 1/8" OF THE BARREL (NO SHINERS).
INTERIOR cFr.T�ON "I' — ISOIATED GROUNDING ZONE
GROUNDING RING ' 0 3 (AT&T) ALL ISOLATED GROUNDING REFERENCE l
� 5 (ATdcT) GROUNDING WINDOW BAR
� � r ,•, .
� ° o„�� �'�.\lI �.�1 ED
N y
� A �Q�,;��-��_� ��i��lr..
P ,
4• (SEE NOTE 1)
C��+ � � � �----2 � �. ----- _
16" '
8" ' _
1/4. 8. ��^ — ° -
16' �.'� _
4 (MGB) REFERENCE GROUNDING BAR N.T.S. 2, NOTES N.T.S.
INSPECTION WINDOW IN BARREL,
REQUIRED FOR ALL INTERIOR CLOSED BARREL, FOR ALL EXTERIOR
TWO—HOLE CONNECTORS
TWO—HOLE CONNECTORS
3/8"0x1 1/2• 3/8`�x1 1/2'
S/S NUT EXTERNAL CLEAR HEAT CLEAR HEAT SHRINK S/S NUT EXTERNAL CLEAR HEAT SHRINK
TOOTHED SHRINK JG�' MIN t/4' A1IN S/S LOCK WASHER TOOTHED BLP,CK HEAT � 7/4' MIN
S/S LOCK WASHER � SHRINK W
S/S FLAT WASHER S/S FLAT WASNER �'�� __
rrrrr��-r -- — LABEL JJJJ1 LABEL
iiiiiii
JJ1111 _
�� - --���-
TINNED COPPER TINNED COPPE
�ROUNDING BAR GROUNDING BAR 'DO NOT DISCONNECT" TAG ON ALL
S/S FLAT 0 NO "DO NOT DISCONNECT" TAG ON ALL S/S fLAT D"CON E T GROUNDING BAR INTERCONNECTS
WASHER CONNE T GROUNDING BAR INTERCONNECTS WASHER AND EQUALJZERS
S/S BOLT �D EQUALIZERS S/S BOLT
(1 OF 2) gUT CONDUCTOR INSULATION UP (1 OF 2) BUT CONDUCTOR INSULATION UP
� 1e• AGAINST THE CONNECTOR BARREL t/is' AGAINST THE CONNECTOR BARREI
MINIMUM SPACING
MINIMUM SPACING
3 EXTERIOR TWO HOLE LUG DETAIL N.T.S. 1 INTERIOR TWO HOLE LUG DETAIL. N.T.S.
.:.: � at&t
, �►..._..�'
188 INVERNESS DRNE WEST
SUfTE 400
ENGLEWOOD, CO 80112
a.
BLACK & VEATCH
304 INVERNESS WAY SOUTH
SUITE 400
ENGLEWOOD, CO 80112
CSAI
GMARLES STEGKLY ARGIITECTURE� Inc.
ARCHIlECTURE - PLANNING - DESIGN
5935 SOUTH ZANG SIREET. SUIlE 28(1
urn.eTOri, caoR�oa eois�
OFFlCE 303.932.9974
FAX: 303.932.6581
PROJECT N0: CAU4025
DRAWN BY: SGP
CHECKED BY: CS
o �i�i,: � �E
� o�i�i,z � ��
� a� �+
LICE RE O:
k�u� O � ��l� �
CONSULTANT:
RED SANDSTONE
COU4025
545 N. FRONTAGE RD.
VAIL, CO 81657
LTE
SHEEf TITLE:
GROUNDING
DETAILS
V � 'V
a
�
N
0
� E
�
��
3a
V- N
J �
� N
ae .
m r�
�o
�
ao
N W
yo
��
TO LOW NOISE
AMPLIFIER UNITS (WA) TO TRANSMIT
�4 OR �6 AWG STRANDED CU (WHEN REQUIRED) �D pNTENNA
CONDUCTOR WRH GREEN, RECEIVE ANTENNA
600V, THWN-2 INSULATION } ANTENNA CABLE
1 ENTRY PORTS
ONOWND�ING BAR (SEE NOTE 6)
FLOOR, OR ON • O O aO •O •
ANTENNA TOWER RX1/RX2 RX1/RX2
SEE NOTE • O O O O•
� � � � � � I I , � � � � ,
��� ��� 0�� �
���g^ p COAX JUMPER RE4UIRED � � � � r 1 STANDARD GROUNDING KIT (lYP.)
� O PER MANUFACTURER � I I I i (SEE NOTE 5) � � i� TWO HOLE CONNECTORS WITH
RECOMMENDATION OR
FOR EASE OF r 1 r"l �2 AWG SOLID BARE i1NNED
CONNECTION (TYP.) � I � I ANTENNA CABLE •••••• NSUV+TIONR(�ANDED GREEN
. .::......::. .
� � TO 8TS (TYP.)
� (2) iW0 IXOTHERMIC TO BE c� C O N N E C T O R � �
?� WEATHERPROOFIN6 KIT / � � _ 1/4"x4"x20' COPPER
USED WITH �2 AWG SOLID �•) ��\� �` �6 AWG STRANDED COPPER �� '�G1 GROUND�NG BAR (TYP.)
BARE TINNED COPPER ,
GROUNDING CONDUCTOR, PVC NONMETALUC FROM LNA CONDUCTOR WITH GREEN, 600V, ` TO GROUNDING
EXOTHERMIC WEID TO CONDUR SCH 40 (WHEN REQUIRED) THWN-2 INSULATION RING
BURIED GROUNDING RING 7YPE (NMC) CONDUIT
AND GROUNDING BAR WITH STRAP WiTHIN GROUNDING BAR, ANDREW PART
iW0 INCHES OF �UGBKIT-0424—T (TINNED). A
CONDUIT END LOCKBOX IS REQUIRED AT GRADE
TASSCO PART � 351546. ANTENN
�-- -'�HEIGHT WILL DEfERMINE NUMBER
OF GROUNDING BARS AND THEIR
LOCATION
�2 AWG TINNED, SOLID COPPER
CONDUCTOR EXOTHERMIC WELD
TO GROUNDING BUS
6 GROUNDING BAR DETAIL n,.r.s. 4 ANTENNA GROUNDING BAR DETAIL N.T.S. 2, COAX ENTRY GROUNDING AT SHELTER N.T.S.
'����.�S��' ��.
INDOOR OUTDOOR ` � �_ i � E
`� �' � '� �
W� 12" MIN. qN7ENNA CABLES (TYP.) PROPOSED GPS I�
ANTENNA .a'�e � . . —._,.....-
CABLE GROUNDING KIT (TYP.) � �/�� f�:•
��.�i�
,�—o- ,�ys �-_. 09
CONNECTED TO (j6 AWG (TYPJ
SURGE ARRESTOR
ANDREW (OR EQUAL) MULTIPLE ENTRANCE WEATHERPROOFING KIT 12' MIN.
WALL FEED THRU ASSEMBLY (SEE NOTE 3) �
GROUNDING PROPOSED GPS ANTENNA MOUNT ANTENNA CABLE a
LUG CLOSURE PLATE CONDUCTOR TO ANDREW P/N MTC2103 OR APPROVED �
TO GROUNDING BAR GROUND RING EQUNALENT
! SECURE TO CABLE �LE TRAY
#2 AWG SOLID TINNED BCW TO GROUNDING ' TRAY USING N
RING % (2 BOLTS CABLE GROUNDING
� Kff
— GROUNDING BAR, ANDREW PART � � SLEEPER
UGBKIT-0424-T (TINNED). A LOCK BOX IS ;
REQUIRED AT EACH ENTRY INTO SHELTER
TASSCO PART � 351546. GROUNDING � �6 AWG STRANDED COPPER
BUS BAR CONDUCTOR WITH GREEN,
NOTES. 600V, THWN-2 INSULATION
0 o GROUNDED TO GROUNDING
1. NUMBER OF GROUNDING BARS MAY VARY DEPENDING ON THE lYPE OF TOWER, ANTENNA LOCATION, AND 1/2' COAX CABLE 8" MINIMUM BENDING RADIUS gqR (SEE NOTES 1& 2)
CONNECTION ORIENTATION. PROVIDE AS REQUIRED. � PER CABLE MANUFACTURER�S SPECIFICATIONS
2. DO NOT INSTALL CABLE GROUNDING Kff AT A BEND AND ALWAYS DIRECT GROUNDING CONDUCTOR DOWN I GROUND KIT
TO GROUNDING BAR. �
`� TO GROUND �6 AWG GROUNDING CABLE (PROVIDED
3. GROUNDING KIT SHALL BE iYPE AND PART NUMBER AS SUPPLJED OR RECOMMENDED BY CABLE `'- -� W/ KIT)
MANUFACTURER.
�2 AWG BARE
4. WEATHER PROOFING SHALL BE TYPE AND PART NUMBER AS SUPPLIED OR RECOMMENDED BY CABLE TINNED COPPER
MANUFACTURER.
5. PROVIDE GROUNDING KIT 6" BEFORE iURN TRANSffION FROM TOWER TO ICE BRIDGE.
6. WHEN THE SCOPE OF WORK REQUIRES THE ADDf110N OF A GROUNDING BAR TO AN EXISTING TOWER,
THE SUBCONTRACTOR SHALL OBTPJN APPROVAL FROM THE TOWER OWNER PRIOR TO MOUNTING THE
GROUNDING BAR TO THE TOWER.
7. EXTEND iW0 (2) #2 AWG TINNED CU CONDUCTOR FROM BURIED GROUNDING RING AND CONNECT TO
THE PROPOSED TOWER. FOLLOW MANUFACTURERS RECOMMENDATIONS FOR GROUNDING CONNECTIONS TO
THE TOWER. (APPLJCABLE TO NEW TOWERS ONLY.)
5 COAX ENTRY GROUNDING BAR & FEED THRU WALL N.T.S. 3 GPS ANTENNA r,.r.s. 1 ANTENNA GROUNDING N.T.S.
���� /� at&t
`�,.j
168 INVERNESS DRNE WE5T
SUITE 400
ENGLEWOOD, CO 80112
�.
BLACK & VEATCH
304 INVERNESS WAY SOUiH
SUITE 400
ENGLEW000, CO 80112
CSAI
CHARLES STEGKLV ARCNITECTURE� Ine.
ARCHITECTURE - PLANNING - DESIGN
5935 SWTN ZANG S7REET, SU17E 280
LIT7I.ETON. CALORADO 80127
OFFlCE 303.932.9974
FA%: 303.9328581
PROJECT N0: CW4086
DRAWN BY: SGP
CHECKED BY: CS
SITE NAME:
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL, CO 81657
LTE—ROOFTOP
GROUNDING
DETAILS
� ~ �
rn
3
a
�
q
U
cE
>+�
�v
�a
w
J �
� N
m n
� O
C
�
�
ao
N �
��
�a
GENERAL CONSTRUCTION NOTES:
1. FOR THE PURPOSE OF CONSTRUCTION DRAWINGS, THE FOLLOWING DEFlNITIONS SHALL APPLY:
GENERAL CONTRACTOR - OVERLAND CONTRACTING INC. (B&V)
SUBCONTRACTOR - CONTR4CTOR (CONSTRUCTION)
OWNER - ATdcT
2. ALL SITE WORK SHALL BE COMPLEfED AS INDICATED ON THE DRAWINGS AND AT&T PRWECT SPECIFICATIONS.
3. GENERAL AND SUBCONTRACTOR SHALL VISff THE SfTE AND SHALL FAMILIARIZE HIMSELF WITH ALL CONDITIONS
AFFECTING THE PROPOSED WORK AND SHALL MAKE PROVISIONS. GENERAL AND SUBCONTRACTOR SHALL BE
RESPONSIBLE FOR FAMILIARIZING HIMSELF WITH ALL CONTRACT DOCUMENTS, FIELD CONDITIONS, DIMENSIONS, AND
CONFlRMING THAT THE WORK MAY BE ACCOMPIJSHED AS SHOWN PRIOR TO PROCEEDING W�TH CONSTRUCTION. ANY
DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE COMMENCEMENT OF WORK.
4. ALL MATERIALS FURN�SHED AND INSTALLED SHALL BE IN STRICT ACCORDANCE WITH ALL APPLICABLE CODES,
REGUTATIONS, AND ORDINANCES. GENERAL CONTRACTOR SHALL ISSUE ALL APPROPRIATE NOIICES AND COMPLY WITH
ALL LAWS, ORDINANCES, RULES, REGULATIONS, AND LAWFUL ORDERS OF ANY PUBLJC AUTHORITY REGARDING THE
PERFORMANCE OF WORK.
5. ALL WORK CARRIED OUT SHAIL COMPLY WITH ALL APPLICABLE MUNICIPAL AND UTILJTY COMPANY SPECIFlCATIONS AND
LOCAL JURISDICTIONAL CODES, ORDINANCES, AND APPLICABLE REGULATIONS.
6. UNLESS NOTED OTHERWISE, THE WORK SHALL INCLUDE FURNISHING MATERIALS, E�UIPMENT, APPURTENANCES, AND
LABOR NECESSARY TO COMPLEfE ALL INSTALLATIONS AS INDICATED ON THE DRAWINGS.
7. PLANS ARE NOT TO BE SCALED. THESE PLANS ARE INTENDED TO BE A DIAGRAMMATIC OUTLINE ONLY UNLESS
OTHERWISE NOTED. DIMENSIONS SHOWN ARE TO FlNISH SURFACES UNLESS OTHERWISE NOTED. SPACING BEfWEEN
EQUIPMENT IS THE MIN. REQUIRED CLEARANCE. THEREFORE, R IS CRf11CAL TO FlELD VERIFY DIMENSIONS, SHOULD
THERE BE ANY QUESTIONS REGARDING THE CONTRACT DOCUMENTS, THE SUBCONTRACTOR SHALL BE RESPONSIBLE
FOR OBTAINING A CLARIFlCATION FROM THE ENGINEER PRIOR TO PROCEEDING WITH THE WORK. DEfAILS ARE
INTENDED TO SHOWN DESIGN INTENT. SITE TYPIFlCATIONS MAY BE REQUIRED TO SUIT JOB DIMENSIONS OR
CONDI170NS AND SUCH SITE TYPIFICATIONS SHALL BE INCLUDED AS PART OF WORK AND PREPARED BY THE
ENGINEER PRIOR TO PROCEEDING WITH WORK.
8. THE SUBCONTRACTOR SHALL INSTALL ALL EQUIPMENT AND MATERL4LS IN ACCORDANCE WITH MANUFACTURER'S
RECOMMENDATIONS UNLESS SPECIFlCALLY STATED OTHERWISE.
9. IF THE SPECIFlED EOUIPMENT CANNOT BE INSTALLED AS SHOWN ON THESE DRAWINGS, THE SUBCONTRACTOR SHALL
PROPOSE AN ALTERNATIVE INSTALLATION SPACE FOR APPROVAL BY THE ENGINEER PRIOR TO PROCEEDING.
10. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE SAFEfY OF WORK AREA, AWACENT AREAS AND BUILDING
OCCUPANTS THAT ARE LIKELY TO BE AFFECTED BY THE WORK UNDER THIS CONTRACT. WORK SHALL CONFlRM TO
ALL OSHA REQUIREMENTS AND THE LOCAL JURISDICTION.
11. GENERAL CONTRACTOR SHALL COORDINATE WORK AND SCHEDULE WORK ACTMTIES WITH OTHER DISCIPUNES.
12. ERECTION SHALL BE DONE IN A WORKMANLIKE MANNER BY COMPEfENT DCPERIENCED WORKMAN IN ACCORDANCE
WITH APPLICABLE CODES AND THE BEST ACCEPTED PRACTICE. ALL MEMBERS SHALL BE LAID PLUMB AND TRUE AS
INDICATED ON THE DRAWINGS.
13. SEAL PENEfRAT10NS THROUGH FIRE RATED AREAS WITH UL LISTED MATERIALS APPROVED BY LOCAL JURISDICTION.
SUBCONTRACTOR SHALL KEEP AREA CLEAN, HAZARD FREE, AND DISPOSE OF ALL DEBRIS.
14. WORK PREVIOUSLY COMPLEfED IS REPRESENTED BY UGHT SHADED LINES AND NOTES. THE SCOPE OF WORK FOR
THIS PRWECT IS REPRESENTED BY DARK SHADED LINES AND NOTES. SUBCONTRACTOR SHALL NOTIFY THE GENERAL
CONTRACTOR OF ANY EXISTING CONDf110NS THAT DEVIATE FROM THE DRAWINGS PRIOR TO BEGINNING CONSTRUCTION.
15. SUBCONTRACTOR SHALL PROVIDE WRfTTEN NOTICE TO THE CONSIRUCTION MANAGER 48 HOURS PRIOR TO
COMMENCEMENT OF WORK.
16. THE SUBCONTRACTOR SHALL PROTECT DCISTING IMPROVEMENTS, PAVEMENTS, CURBS, LANDSCAPING AND STRUCTURES.
ANY DAMAGED PART SHALL BE REPAIRED AT SUBCONTRACTOR'S EXPENSE TO THE SATISFACTION OF THE OWNER.
17. THE SUBCONTRACTOR SHALL CONTACT UTILfIY LOCATING SERVICES PRIOR TO THE START OF CONSTRUCTION.
18. GENERAL CONTRACTOR SHALL COORDINATE AND MAINTAIN ACCESS FOR ALL TRADES AND SUBCONTRACTORS TO THE
SITE AND/OR BUILDING.
19. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR SECURIIY OF THE SITE FOR THE DURATION OF
CONSTRUCTION UNTIL JOB COMPLETION.
20. THE GENERAL CONTRACTOR SHALL MAINTAIN IN GOOD CONDITION ONE COMPLETE SEf OF PLANS WITH ALL REVISIONS.
ADDENDA, AND CHANGE ORDERS ON THE PREMISES A7 ALL TIMES.
21. THE GENERAL CONTRACTOR AND SUBCONTR4CTOR SHALL PROVIDE PORTABLE FlRE EXTINGUISHERS WITH A RATING OF
NOT LESS THAN 2-A OT 2-A:10-B:C AND SW\LL BE WITHIN 25 FEEf OF TRAVEL DISTANCE TO ALL PORTIONS OF
WHERE THE WORK IS BEING COMPLETED DURING CONSTRUCTION.
22. ALL EXISTING ACTNE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES SHALL BE PROTECTED AT ALL T1MES. AND
WHERE REQUIRED FOR THE PROPER IXECUTION OF THE WORK, SHALL BE RELOCATED AS DIRECTED BY ENGINEER.
EXTREME CAUTION SHOULD BE USED 8Y THE SUBCONTRACTOR WHEN EXCAVATING OR DRILLING PIERS AROUND OR
NEAR UTILITIES. SUBCONTRACTOR SHAI1 PROVIDE SAFETY TRNNING FOR THE WORKING CREW. THIS WILL INCLUDE BUT
NOT BE LJMITED TO A) FALL PROTECTION, B) CONFlNED SPACE, C) ELECTRICAL SAFEfY, AND D) TRENCHING dc
occnvnnoN.
23. ALL EXISTING INACTIVE SEWER, WATER, GAS, ELECTRIC, AND OTHER UTILITIES, WHICH INTERFERE WITH THE EXECUTION
OF THE WORK, SHALL BE REMOVED, CAPPED, PLUGGED OR OTHERWISE DISCONNECTED AT POINTS WHICH WILL NOT
INTERFERE WffH 1HE D(ECUTION OF THE WORK, AS DIRECTED BY THE RESPONSIBLE ENGINEER, AND SUBJECT TO
THE APPROVAL OF THE OWNER AND/OR LOCAL UTILITIES.
24. THE AREAS OF THE OWNERS PROPERTY DISTURBED BY THE WORK AND NOT COVERED BY THE TOWER, EQUIPMENT
OR DRNEWAY, SHALL BE GRADED TO A UNIFORM SLOPE, AND STABILIZED TO PREVENT EROSION.
25. SUBCONTRACTOR SHALL MINIMIZE DISTURBANCE TO THE EXISTING SITE DURING CONSTRUCTION. EROSION CONTROL
MEASURES, IF REQUIRED DURING CONSTRUCTION, SHALL BE IN CONFORMANCE WITH THE FEDERAL AND LOCAL
JURISDICTION FOR EROSION AND SEDIMENT CONTROL.
26. NO FlLL OR EMBANKMENT MATERIAL SHALL BE PLACED ON FROZEN GROUNDING. FROZEN MATERIALS, SNOW OR ICE
SHALL NOT 8E PLACED IN ANY FlLL OR EMBANKMENT.
GENERAL CONSTRUCTION NOTES
27. THE SUBGRADE SHALL BE BROUGHT TO A SMOOTH UNIFORM GRADE AND COMPACTED TO 95 PERCENT
STANDARD PROCTOR DENSITY UNDER PAVEMENT AND STRUCTURES AND 80 PERCENT STANDARD
PROCTOR IN OPEN SPACE. ALL TRENCHES IN PUBLIC RIGHT OF WAY SHALL BE BACKFILLED WITH
FLOWABLE FlLL OR OTHER MATERIAL PRE-APPROVED BY iHE LOCAL JURISDICTION.
28. ALL NECESSARY RUBBISH, STUMPS, DEBRIS, STICKS, STONES, AND OTHER REFUSE SHALL BE REMOVED
FROM THE SITE AND DISPOSED OF IN A LAWFUL MANNER.
29. ALL BROCHURES, OPERATING AND MAINTENANCE AAANUALS, CATALOGS, SHOP DRAWINGS, AND OTHER
DOCUMENTS SHALL BE TURNED OVER TO THE GENERAL CONTRACTOR AT COMPLEfION OF
CONSTRUCTION AND PRIOR TO PAYMENT.
30. SUBCONTRACTOR SHALL SUBMIT A COMPLEfE SEf OF AS-BUILT REDLINES TO THE GENERAL
CONTR4CTOR UPON COMPLETION OF PROJECT AND PRIOR TO FINAL PAYMENT.
31. SUBCONTRACTOR SHALL LEAVE PREMISES IN A CLEAN CONDITION.
32. THE PROPOSED FACILRY WILL BE UNMANNED AND DOES NOT REQUIRE POTABLE WATER OR SEWER
SERVICE, AND IS NOT FOR HUMAN HABITAT. (NO HANDICAP ACCESS REQUIRED).
33. OCCUPANCY IS LJMITED TO PERIODIC MAINTENANCE AND INSPECTION, APPROXIMATELY 2 TIMES PER
MONTH. BY AT&T TECHNICIANS.
34. NO OUTDOOR STORAGE OR SOLJD WASTE CONTAINERS ARE PROPOSED.
35. ALL MATERL4L SHALL BE FURNISHED AND WORK SHALL BE PERFORMED IN ACCORDANCE WfTH THE
LATEST REYISION AT&T MOBILIIY GROUNDING STANDARD "TECHNICAL SPECIFlCATION FOR CONSTRUCTION
OF GSM/GPRS WIRELESS SITES' AND 'TECHNICAL SPECIFlCATION FOR FACILITY GROUNDING'. IN CASE
OF A CONFLICT BE'fWEEN THE CONSTRUCTION SPECIFlCATION AND THE DRAWINGS, THE ORAWINGS
SHALL GOVERN.
36. SUBCONTRACTORS SHALL BE RESPONSIBLE FOR OBTAINING ALL PERM(TS AND INSPECTIONS REQUIRED
FOR CONSTRUCTION. IF SUBCONTRACTOR CAN NOT OBTAIN A PERMIT, THEY MUST NOTIFY THE
GENERAL CONTRACTOR IMMEDIATELY.
37. SUBCONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE SITE ON A DAILY BASIS.
38. INFORMATION SHOWN ON THESE DRAWINGS WAS OBTAINED FROM SITE VISITS AND/OR DRAWINGS
PROVIDED BY THE SITE OWNER. CONTRACTORS SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES
PRIOR TO ORDERING MATERIAL OR PROCEEDING WITH CONSTRUCTION.
39. NO WHITE STROBIC LIGHTS ARE PERMITfED. LIGHTING IF REQUIRED, WILL MEEf FAA SfANDARDS AND
REQUIREMENTS.
40. ALL COAXIAL CABLE INSTALLATIONS TO FOLLOW MANUFACTURER�S INSTRUCl10NS AND
RECOMMENDATIONS.
41. NO NOISE, SMOKE, DUST, ODOR, OR VIBRATIONS WILL RESULT FROM THIS FACILRY.
42. NO ADDRIONAL PARKING TO BE PROPOSED. EXISTING ACCESS AND PARKING TO REMAIN.
43. NO LANDSCAPING IS PROPOSED AT THIS SITE.
°--�����Ly f
9 �
�i a-�'?...�:��+6`�� �
� � ��� � �
, ra.e-�-----F'-
� ��.. _r,_ _..-T _
.r �-.mY, �� ._-
� at&t
�
188 INVERNESS DRNE WEST
SUITE 400
ENGlEW00D, CO 60112
�.
BLACK & VEATCH
304 INVERNESS WAY SOUTH
SUITE 400
ENGLEWOOD, CO 80112
CSAI
CMARLE8 STECKLY ARGXITEGTURE� Inc.
ARCHITECTURE - PLANNING - DESIGN
' S935 SOU7H ZANG S7REET, SUIIE 280
urnFroN, caoR�oo eoi2�
OFFlCE: 303.932.9974
FAX: 303.932.8581
PRQIECT N0: COU4088
DRAWN BY: SGP
CHECKm BY: CS
o ae/ae/�2 co �ssue
� s/zs/tx cn n�cw
�v wre oescrar�rox
Li RE NO:
.fUN 4 � 2Q1�
, CONSULTANT:
SITE NAME:
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL, CO 81657
LTE-ROOFTOP
SHEEi TITLE:
GENERAL
CONSTRUCTION
NOTES
SHEET NUMBER:
V 1 1 ~ �
3
�
z
c?
U
�
�a
3WQ
F N
m `4i
mr
�°
�
a�N
��
ga
GENERAL SITE WORK & DRAINAGE NOTES
p�j2T 1 - GENERAL
CLEARING, GRUBBING, STRIPPING, EROSION CONTROL, SURVEY, IAYOUT, SUBGRADE PREPARATION
AND FINISH GRADING AS REQUIRED TO COMPLEfE THE PROPOSED WORK SHOWN IN THESE PLANS.
1.1 REFERENCES:
A.DOT (STATE DEPARTMENT OF TRANSPORTATION STANDARD SPECIFlCATIONS FOR HIGHWAY
CONSTRUCTION-CURRENT EDITION}.
B.ASTM (AMERICAN SOCIEfY FOR TESTING AND MATERW.S).
C.OSHA (OCCUPATION SAFETY AND HEALTH ADMINISTRATION).
1.2 INSPECTION AND TESTING:
A. FlELD TESTING OF EARTHWORK COMPACTION AND CONCREfE CYLJNDERS SHALL BE
PERFORMED 8Y CONTRACTORS INDEPENDENT TESTING LAB. THIS WORK TO BE COORDINATED
BY THE CONTR4CTOR.
B.ALL WORK SHALL BE INSPECTED AND RELEASED BY THE GENERAL CONTRACTOR WHO SHALL
CARRY OUT THE GENERAL INSPECTION OF THE WORK WITH SPECIFlC CONCERN TO PROPER
PERFORMANCE OF THE WORK AS SPECIFIED AND/OR CALLED FOR ON THE ORAWINGS. IT IS
THE COMRACTOR'S RESPONSIBILITY TO REQUEST TIMELY INSPECTIONS PRIOR TO
PROCEEDING WITH FURIHER WORK THAT WOULD MAKE PARTS OF WORK INACCESSIBLE OR
DIFFICULT TO INSPECT.
1.3 SfTE MAINTENANCE AND PROTECTION:
A.PROVIDE ALL NECESSARY JOB SRE MAINTENANCE FROM COMMENCEMENT OF WORK UNTIL
COMPLEfION OF THE SUBCONTRACT.
B.AVOID DAMAGE TO THE SITE AND TO EXIS7ING fACILffIES, STRUCTURES, TREES, AND
SHRUBS DESIGNATED TO REMPJN. TAKE PROTECTNE MFASURES TO PREVENT EXISTING
FACILITIES THAT ARE NOT DESIGNATED FOR REIAOVAL FROM BEING DAMAGED BY THE WORK.
C.KEEP SITE FREE OF ALL PONDING WATER.
D.PROVIDE EROSION COMRO� MEASURES IN ACCORDANCE WITH STATE DOT AND EPA
REQUIREMENTS.
E.PROVIDE AND MAINTAIN ALL TEMPORARY FENCING, BARRICADES, WARNING SIGNALS AND
SIMILAR DEVICES NECESSARY TO PROTECT AGAINST THEFf FROM PROPERTY DURING THE
ENTIRE PERIOD OF CONSTRUCTION. REMOVE ALL SUCH DEVICES UPON COMPLEfION OF THE
WORK.
F.DCISTING UTIUTIES: DO NOT INTERRUPT EXIS7ING UTILff1ES SERVING FACIIITIES OCCUPIED BY
THE OWNER OR OTHERS, IXCEPT WHEN PERMfTTED IN WRITING BY THE ENGINEER AND
THEN ONLY AFTER ACCEPTABLE TEMPORARY UTILITY SERVICES HAVE BEEN PROVIDED.
1. PROVIDE A AAINIMUM 48-HOUR NOTICE TO THE ENGINEER AND RECEIVE WRf1TEN NOTICE
TO PROCEED BEFORE INTERRUPTING ANY UTILfTY SERVICE.
PART 2 - PRODUCTS
2.1 SUITABLE BACKFlLL: ASTM D2321 (CLASS I, II, III OR NA) FREE FROM FROZEN LUMPS,
REFUSE, STONES OR ROCKS LARGER THAN 3 INCHES IN ANY DIMENSION OR OTHER MATERIAL
THAT MAY MAKE THE INORGANIC MATERIAL UNSUITABLE FOR BACKFlLL
2.2 NON-POROUS GRANULAR EMBANKMENT AND BACKFILL: ASTM D2321 (CLASS III, NA OR NB)
COARSE AGGREGATE. FREE FROM FROZEN LUMPS. REFUSE, STONES OR ROCKS LARGER
THAN 3 INCHES IN ANY DIMENSION OR OTHER MATERIAL THAT MAY MAKE THE INORGANIC
MATERIAL UNSURABLE FOR BACKFlLL.
2.3 POROUS GRANULAR EMBANKMENT AND BACKFILL: ASTM D2321 (CLASS IA, IB OR II) COARSE
AGGREGATE FREE FROM FROZEN LUMPS, REFUSE, STONES OR ROCKS LARGER THAN 3
INCHES IN ANY DIMENSION OR OTMER MATERIAL THAT MAY MAKE THE INORGANIC MATERIAL
UNSUITABLE FOR BACKFlLL.
2.4 SEIFCT STRUCTURAL FILL: GRANULAR FILL MATERIAL MEETING THE REQUIREMENTS OF ASTM
E850-95. FOR USE AROUND AND UNDER STRUCTURES WHERE STRUCTURAL FILL MATERIAL
ARE REQUIRED.
2.5 GRANULAR BEDDING AND TRENCH BACKFlLL: WELL-GRADED SAND MEETING THE GRADATION
RE�UIREMENTS OF ASTM D2487 (SE OR SW-SM).
2.6 COARSE AGGREGATE FOR ACCESS ROAD SUBBASE COURSE SHALL CONFORM TO ASTM D2940.
2.7 UNSUITABLE MATERU�L: HIGH AND MODERATELY PLASTIC SILTS AND CIAYS (LL>45). MATERIAL
CONTPJNING REFUSE, FROZEN LUMPS, DEMOLISHED BfTUMINOUS MATERIAL, VEGETATIVE MATfER,
WOOD, STONES IN D(CESS OF 3 INCHES IN ANY DIMENSION, AND DEBRIS AS DEfERMINED BY
THE CONSTRUCTION MANAGER. NPICAL THESE WILL BE SOILS CLASSIFlED BY ASTM AS PT,
MH, CH, OH, ML, AND OL.
2.8 GEOTEXTILE FABRIC: MIRAFl 500X OR ENGINEERED APPROVED EQUAL.
2.9 PLASTIC MARK�NG TAPE: SHALL BE ACID AND ALKAU RESISTANT POLYETHYLENE FlLM
SPECIFlCALLY MANUFACTURED FOR MARKING AND LOCATING UNDERGROUND UTILITIES, 6
INCHES WIDE WITH A MINIMUM THICKNESS OF 0.004 INCH. TAPE SHALL HAVE MINIMUM
STRENGTH OF 1500 PSI IN BOTH DIRECTIONS AND MANUFACTURED WITH INTEGRAL
CONDUCTORS, FOIL BACKING OR OTHER MEANS TO ENABLE DEfECTION BY A METAL DEfECTOR
WHEN BURIED UP TO 3 FEEf DEEP. THE METALLIC CORE OF THE TAPE SHALL BE ENCASED
IN A PROTECTNE JACKET OR PROVIDED WITH OTHER MEANS TO PROTECT IT FROM
CORROSION. TAPE COLOR SHALL BE RED FOR ELECTRIC UT1LITlES AND ORANGE FOR
TELECOMMUNICATION UTILITIES.
GENERAL SITE WORK & DRAINAGE NOTES
PART 3 - DCECUTION
3.1 GENERAL:
A BEFORE STARTING GENERAL SITE PREPARATION ACTNITIES, INSTALL EROSION AND SEDIMENT
CONTROL MEASURES. THE WORK AREA SHALL BE CONSTRUCTED AND MNNTAINED IN SUCH
CONDffION THAT IN THE EVENT OF RPJN THE SITE WILL BE DRAINED AT ANY TIME.
B.BEFORE ALL SURVEY. LAYOUT, STAKING, AND MARKING, ESTABLISH AND MPJNTAIN ALL IJNES,
GRADES, ELEVATIONS AND BENCHMARKS NEEDFD FOR EXECUTION OF THE WORK.
C.CLEAR AND GRUB THE AREA WITHIN THE LIMITS OF THE SITE. REMOVE TREES, BRUSH,
STUMPS, RUBBISH AND OTHER DEBRIS AND VEGETATION RESTING ON OR PROTRUDING
THROUGH THE SURFACE OF THE SfTE AREA TD BE CLEARED.
7. REMOVE THE FOLLOWtNG MATERIALS TO A DEPTH OF NO LESS THAN 12 INCHES BELOW
THE ORIGINAL GROUND SURFACE: ROOTS, STUMPS, AND OTHER DEBRIS, BRUSH, AND
REFUSE EMBEDDED IN OR PROTRUDING THROUGH THE GROUND SURFACE, RAKE, DISK OR
PLOW THE AREA TO A DEPTH OF NO LESS THAN 6 INCHES, AND REMOVE TO A DEPTH
OF 12 INCHES ALL ROOTS AND OTHER DEBRIS THEREBY IXPOSED.
2. REMOVE TOPSOIL MATERIAL COMPLEfELY FROM THE SURFACE UNTIL THE SOIL NO
LONGER MEETS THE DEFlNITION OF TOPSOIL AVOID MIXING TOPSOIL WITH SUBSOIL OR
OTHER UNDESIRABLE MATERIALS.
3. EXCEPT WHERE EXCAVATION TO GREATER DEPTH IS INDICATED, FlLL DEPRESSIONS
RESULTING FROM CLEARING, GRUBBING AND DEMOLITION WORK COMPLETELY WITH
SUITABLE FlLL.
D.REMOVE FROM THE SITE AND DISPOSE IN AN AUTHORIZED LANDFILL ALL DEBRIS RESULTING
FF20M CLEARING AND GRUBBING OPERATIONS. BURNING WILL NOT BE PERMITTED.
E.PRIOR TO IXCAVATING, THOROUGHLY EXAMINE THE AREA TO BE EXCAVATED AND/OR
TRENCHED TO VERIFY THE LOCATIONS OF FEATURES INDICATED ON THE DRAWINGS AND TO
ASCERTAIN THE DCISTENCE AND LOCATION OF ANY STRUCTURE, UNDERGROUND STRUCTURE,
OR OTHER ffEM NOT SHOWN THAT MIGHT INTERFERE WITH THE PROPOSED CONSTRUCTION.
NOTIFY THE CONSTRUCTION MANAGER OF ANY OBSTRUCT�ONS THAT WILL PREVENT
ACCOMPLJSHMENT OF THE WORK AS INDICATED ON THE DRAWINGS.
F.SEPARATE AND STOCK PILE ALL EXCAVATED MATERIALS SURABLE FOR BACKFlLL. ALL
EXCESS EXCAVATED AND UNSUITABLE MATERIALS SHALL BE DISPOSED OF OFF-SITE IN A
IEGAL MANNER.
3.2 BACKFILL:
hAS SOON AS PRACTICAL, AFfER COMPLETING CONSTRUCTION OF THE RELATED STRUCTURE,
INCLUDING EXPIRATION OF THE SPECIFlED MIN�MUM CURING PERIOD FOR CAST-IN-PLACE
CONCREfE, BACKFlLL THE EXCAVAl10N WITH APPROVED MATERIAL TO RESTORE THE
REQUIRED FlNISHED GRADE.
1. PRIOR TO PLACING BACKFlLL AROUND STRUCTURES, ALL FORMS SHALL BE REMOVED
AND THE EXCAVATION CLFANED OF ALL TRASH. DEBRIS, AND UNSUITABLE MATERL4LS.
2. BACKFlLL BY PLACING AND COMPACTING SUITABLE BACKFILL MATERL4L OR SELECT
GRANULAR BACKFILL MATERIAL WHEN REQUIRED IN UNIFORM HORIZONTAL LAYERS OF NO
GREATER TFiAN 8-INCHES LOOSE THICKNESS AND COMPACTED. WHERE HAND OPERATED
COMPACTORS ARE USED. THE FlLL MATERIAL SHALL BE PLACED IN LJF"fS NOT TO DCCEED
4 INCHES IN LOOSE DEPTH AND COMPACTED.
3. WHENEVER THE DENSITY TESTING INDICATES THAT THE CONTRACTOR HAS NOT OBTAINED
THE SPECIFIED DENSITY, THE SUCCEEDING LAYER SHALL NOT 8E PLACED UNTIL THE
SPECIFICATION REQUIREMENTS ARE MEf UNLESS OTHERWISE AUTHORIZED BY THE
GEOTECHNICAL ENGINEER. THE CONTRACTOR SHALL TAKE WHATEVER APPROPRIATE ACTION
IS NECESSARY, SUCH AS DISKING AND DRYING, ADDING WATER, OR INCREASING THE
COMPACTNE EFFORT TO MEET THE MINIMUM COMPACTION REQUIREMENTS.
B.THOROUGHLY COMPACT EACH LAYER OF BACKFlLL TO A MINIMUM OF 95 PERCENT OF THE
MAXIMUM DRY DENSITY AS PROVIDED BY THE STANDARD PROCTOR TEST, ASTM D 698.
3.3 TRENCH EXCAVATION:
A.UTILITY TRENCHES SHALL BE EXCAVATED TO THE LJNES AND GRADES SHOWN ON THE
DRAWINGS OR AS DIRECTED BY THE GENERAL CONTRACTOR. PROVIDE SHORING, SHEETING
AND BRACING AS REQUIRED TO PREVENT CAVING OR SLOUGHING OF THE TRENCH WALLS.
B.IXTEND THE TRENCH WIDTH A MINIMUM OF 6 INCHES BEYOND THE OUTSIDE EDGE OF THE
OUTERMOST CONDUIT.
C.WHEN SOFT YIELDING, OR OTHERWISE UNSTABLE SOIL CONDITIONS ARE ENCOUNTERED,
&4CKFlLL AT THE REQUIRED TRENCH TO A DEPTH OF NO LESS THAN 12 INCHES BELOW
THE REQUIRED ELEVATION AND BACKFILL WITH GRANULAR BEDDING MATERIAL.
3.4 TRENCH BACKFILL:
A. PROVIDE GRANULAR BEDDING MATERIAL IN ACCORDANCE WITH THE DR4WINGS AND THE
UTILITY REQUIREMENT'S.
B.NOTIFY THE GENERAL CONTRACTOR 24 HOURS IN ADVANCE OF BACKFlWNG.
C.CONDUCT UTILITY CHECK TESTS BEFORE BACKFIWNG. BACKFlLL AND COMPACT TRENCH
BEFORE ACCEPTANCE TESTING.
D.PLACE GRANULAR TRENCH BACKFlLL UNIFORMLY ON BOTH SIDES OF THE CONDUITS IN
6-INCH UNCOMPACTED LIFfS UNTIL 12 INCHES OVER THE CONDUITS. SOLIDLY RAM AND
TAMP BACKFlLL INTO SPACE AROUND CONDUITS.
E.PROTECT CONDUR FROM LATERAL MOVEMENT, IMPACT DAMAGE, OR UNBALANCED LOADING.
F.A80VE THE CONDU�T EMBEDMENT ZONE, PLACE AND COMPACT SATISFACTORY BACKFlLL
MATERIAL IN 8-�NCH MAXIMUM LOOSE THICKNESS LJFTS TO RESTORE THE REQUIRED
FlNISHED SURFACE GRADE.
G.COMPACT FINAL TRENCH BACKFlLL TO A DENSITY EQUAL TO OR GREATER THAN THAT
OF THE IXISTING UNDISTURBED MATERIAL IMMEDIATELY ADJACENT TO THE TRENCH BUT
NO LESS THAN A MINIMUM OF 95 PERCENT OF THE MAXIMUM DRY DENSITY AS
PROVIDED BY THE STANDARD PROCTOR TEST. ASTM D 698.
3.5 AGGREGATE ACCESS ROAD:
A CLEAR, GRUB, STRIP AND IXCAVATE FOR THE ACCESS ROAD TO THE LINES AND
GRADES INDICATED ON THE DRAWINGS. SCARIFY TO A DEPTH OF 6 INCHES AND
PROOF-ROLL ALL HOLES, RUTS, SOFT PLACES AND OTHER DEFECTS SHALL BE
CORRECTED.
B.THE ENTIRE SUBGRADE SHALL BE COMPACTED TO NOT LESS THAN 95 PERCENT OF
THE MAXIMUM DRY DENSIiY AS PROVIDED BY THE MODIFlED PROCTOR TEST. ASTM D
1557.
C.AFTER PREPARATION OF THE SUBGRADE IS COMPLETE THE GEOTEXTILE FABRIC (MIRAFl
500Xi) SHALL BE INSTALLED TO THE LIMITS INDICATED ON THE DRAWINGS BY ROLLING
THE FABRIC OUT LONGITUDiNALLY ALONG THE ROADWAY. THE FABRIC SHALL NOT BE
DRAGGED ACROSS THE SUBGRADE. PL4CE THE ENTIRE ROLL IN A SINGLE OPERATION,
ROWNG OUT AS SMOOTHLY AS POSSIBLE.
1. OVERLAPS PARALLEL TO THE ROADWAY WILL BE PERMITTED AT THE CENTERLINE
AND AT LOCAl10NS BEYOND THE ROADWAY SURFACE WIDTH (I.E. WlTHIN THE
SHOULDER WIDTH) ONLY. NO IONGITUDINAL OVERLAPS SHALL BE LOCATED BEfWEEN
THE CENTERLINE AND THE SHOULDER. PARALLEL OVERLAPS SW1LL BE A MINIMUM
OF 3 FEET WIDE.
2. TRANSVERSE (PERPENDICULAR TO THE ROADWAY) OVERLAPS AT THE END OF A
ROLL SHALL OVERLAP IN THE DIRECTION OF THE AGGREGATE PLACEMENT (PREVIOUS
ROLL ON TOP) AND SHALL HAVE A MINIMUM LENGTH OF 3 FEEf.
3. ALL OVERLAPS SHALL BE PINNED WITH STAPLES OR NAILS A MINIMUM OF 10
INCHES LONG TO INSURE POSRIONING DURING PLACEMENT OF AGGREGATE. PIN
LONGITUDINAL SEAMS AT 25 F00T CENTERS AND TRANSVERSE SEAMS EVERY 5
��.
D.THE AGGREGATE BASE AND SURFACE COURSES SHALL BE CONSTRUCTED IN LAYERS
NOT MORE THAN 4 INCH (COMPACTED) THICKNESS. AGGREGATE TO BE PLACED ON
GEOTEXTILE FABRIC SHALL BE END-DUMPED ON THE FABRIC FROM THE FREE END OF
THE FABRIC OR OVER PREVIOUSLY PLACED AGGREGATE. THE FIRST LJFT SHALL BE
BLADED DOWN TO A THICKNESS OF S INCHES PRIOR TO COMPACTION. AT NO TIME
SHALL EQUIPMENT, EITHER TRANSPORTING THE AGGREGATE OR GRADING THE
AGGREGATE, BE PERMITTED ON THE ROADWAY WITH LESS THAN 4 INCHES OF
MATERIAL COVERING THE FABRIC.
E.THE AG�REGATE SHALL BE IMMEDIATELY COMPACTED TO NOT LESS THAN 95 PERCENT
OF THE MAXIMUM DRY DENSRY AS PROVIDED BY THE MODIFlED PROCTOR TEST, ASTM
D 1557 WfTH A TAMPING ROLLER, OR WITH A PNEUMATIC-TIRED ROLLER, OR WfTH A
VIBRATORY MACHINE OR ANY COAIBINATION OF THE ABOVE. THE TOP LAYER SHALL BE
GNEN A FINAL ROLLING WITH A THREE-WHEEL OR TANDEM ROLLER.
3.6 FINISH GRADING:
A PERFORM ALL GRADING TO PROVIDE POSITIVE DRAINAGE AWAY FROM STRUCTURES AND
SMOOTH, EVEN SURFACE DRAINAGE OF THE ENTIRE AREA WITHIN THE LIMRS OF
CONSTRUCTION. GRADING SHALL BE COMPATIBLE WITH ALL SURROUNDING TOPOGRAPHY
AND STRUCTURES.
B.UTILIZE SATISFACTORY FlLL MATERIAL RESULTING FROM THE EXCAVATION WORK IN THE
CONSTRUCTION OF FILLS, EMBANKMENTS AND FOR REPLACEMENT OF REMOVED
UNSUITABLE MATERIALS.
C.ACHIEVE FINISHED GRADE BY PLACING A MINIMUM OF 4 INCHES OF 1/2� - 3/4"
CRUSHED STONE ON TOP SOIL STABItJZER FABRIC.
D.REPAIR ALL ACCESS ROADS AND SURROUNDING AREAS USED DURING TFiE COURSE OF
THIS WORK TO THEIR ORIGINAL CONDITION.
3.7 ASPHAIT PAVING ROAD:
A DIVISION 600 - KDOT FLDCIBLE PAVEMENT. yodote Qer local DOTI
B.SECTION 403 - MODOT ASPHALT CONCRETE PAVEMENT.
-
','° V � � m • � �+ �.
a� � � �_ 1 k`: `�,'
�t�-., � �'� t �
�
�e
� .._��--- . _T_� _
O �
���� /at&t
�'
168 INVERNESS DRNE WEST
SUfTE 400
ENGLEWOOD, CO 80112
�.
BLACK & VEATCH
304 INVERNESS WAY SOUTH
SURE 400
ENGlFlM00D, CO 80112
CSAI
CHARLES 8TECKLY ARCM�TEGTURE� Inc.
ARCHITECillRE - PLANNING - DESIGN
ssas soun+ zu+c srn�r, sui� 2eo
urn.erorr. ca.oR,wo eo�z�
OFFlCE: 303.9329974
�. FA%: 303.932.6581
PROJECT N0: COU4088
DRAWN BY: SGP
CHECKED BY: CS
o ae/ae/is co �uc
� s/zs/u co nentw
�v ah o6c�ano�
LICENSUR O:
JUN 0 $ 2012
CONSULTANT:
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL> CO 81657
LTE-ROOFTOP
GENERAL SITE
WORK & DRAINAGE
NOTES
CN�2,
♦
�'
m
� �
V E
>�
u� .
�N
3Q
�Q
�N
m�
�o
C
0 '
go
N W
��
�a
�
GENERAL ELECTRICAL NOTES:
pART 1- GENEF2AL D. CHEMICAL ELECTROLITIC GROUNDING SYSTEM: B
1. INSTALL CHEMICAL GROUNDING AS REQUIRED. THE SYSTEM SHALL BE ELECTROLYTIC 1
1.1 GENERAL CONDITIONS: MAINTENANCE FREE ELECTRODE CONSISTING OF RODS WITFi A MINIAAUM 2 AWG CU
A. CONTRACTOR SHALL INSPECT THE IXISTING SITE CONDITIONS PRIOR TO SUBMI7TING IXOTHERMALLY WELDED PIGTAIL. PROTECTIVE BOXES, AND BACKFlLL MATERU�L.
BID. ANY QUESTIONS ARISING DURING THE BID PERIOD IN REGARDS TO THE MA)NUFACTURER SHALL BE LYNCOLE XIT GROUNDING ROD 1YpES K2-(*)CS OR K2L-(*)CS
TOBTHIS RWECT SHALLI BE �8 OUGHT UP DURWNG THE BID PERIODRWITHUTHE E��� p, �'f�OUND ACCE S BOXRSHALL BE A POLYPLASTIC BOX FOR NON-TRAFFlC APPLICATIONS,
PROJECT MANAGER FOR CLARIFICATION, NOT AFfER THE CONTRACT HAS BEEN INCLUDING BOLT DOWN FLUSH COVER WITH "BREATHER' HOLES, XR MODEL XB-22. ALL
AWARDED. DISCONNECT SWITCHES AND CONTROWNG DEVICES SHALL BE PROVIDED W ENGRAVED
B. THE SUBCONTRACTOR SHALL OBTAIN PERMfTS, UCENSES, MAKE ALL DEPOSITS, AND �p,MIC01D NAMEPLATES INDICATING EQUIPMENT CONTROLLED, BRANCH CIRCUITS ID
PAY ALL FEES REQUIRED FOR THE CONSTRUCTION PERFORMANCE FOR THE WORK NUMBERING, AND THE ELECTRICAL POWER SOURCE. Z
UNDER THIS SECTION. 3. BACKFILL MATERIAL SHALL BE LYNCONfTE AND LYNCOLE GROUNDING GRAVEL 3
C. DR4WINGS SHOW THE GENERAL ARRANGEMENT OF ALL SYSTEMS AND COtdPONENTS
COVERED UNDER THIS SECTION. THE SUBCONTR4CTOR SHALL VERIFY ALL E. SYSTEM GROUNDING:
DIMENSIONS. DRAWING SHALL NOT BE SCALED TO DEfERMINE DIMENSIONS. �, ALL GROUNDING COMPONEMS SHALL BE TINNED AND GROUNDING CONDUCTOR SHALL BE
2 AWG BARE, SOLJD, TINNED, COPPER. ABOVE GRADE GROUNDING CONDUCTORS SHALL BE
1.2 LAWS, REGULATIONS, ORDINANCES, STATUTES AND CODES. INSULATED WHERE NOTED.
A. ALL WORK SHALL BE INSTALLED IN ACCORDANCE WRH THE IATEST EDITION OF THE 2, GROUNDING BUSES SHALL BE BARE, TINNED, ANNEALED COPPER BARS OF RECTANGULAR
NATIONAL ELECTRICAL CODE, AND ALL APPLICABLE LOCAL LAWS, REGULATIONS. CROSS SECTION. STANDARD BUS BARS MGB. SHALL BE FURN�SHED AND INSTALI.ED BY
ORDINANCES, STATUTES AND CODES. CONDUR BENDS SHALL BE THE RADIUS BEND 7}{E SUBCONTRACTOR. THEY SHALL NOT BE FABRICATED OR MODIFlED IN TNE FlELD. ALL
FOR THE TRADE SIZE OF CONDUIT IN COMPIJANCE WITH THE LATEST EDfTIONS OF GROUNDING BUSES SHALL BE IDENTIFlED WITH MINIMUM 3/4' LEffERS BY WAY OF
NEC. STENCILING OR DESIGNATION PLATE.
3. CONNECTORS SHALL BE HIGH-CONDUCTMN, HEAVY DUTY, LISTED AND LABELED AS �
1.3 REFERENCES: GROUNDING CONNECTORS FOR THE MATERIALS USED. USE TWO-HOLE COMPRESSION LUGS
A. THE PUBUCATIONS LISTED BELOW ARE PART OF THIS SPECIFICATION. EACH W�7►� HEAT SHRINK FOR MECHANICAL CONNECTIONS.
PUBLICATION SHALL BE THE LATEST REVISION AND ADDENDUM IN EFFECT ON THE {, D(OTHERMIC WELDED CONNECTIONS SHALL BE PROVIDED IN KIT FORM AND SELECTED FOR
DATE. THIS SPECIFICATION IS ISSUED FOR CONSTRUCTION UNLESS OTHERWISE NOTED. TF{E SPECIFlC lYPES, SIZES, AND COMBINATIONS OF CONDUCTORS AND OTHER ITEMS TO �
D(CEPT AS MODIFlED BY THE REQUIREMENT SPECIFlED HEREIN OR THE DEfPJLS OF BE CONNECTED.
THE DRAWINGS, WORK INCLUDED IN THIS SPECIFlCATION SHALL CONFORM TO THE 5. GROUND RODS SHALL BE COPPER-CU1D STEEL WITH HIGH-STRENGTH STEEL CORE AND
APPUCABLE PROVISION OF THESE PUBLICATIONS. ELECTROLYTIC-GRADE COPPER OUTER SHEATH, MOLTEN WELDED TO CORE, 5/8'x10'-0'.
6. INSTALL AN EQUIPMENT GROUNDING CONDUCTOR IN ALL CONDUITS IN COMPW�NCE WITH
1. ANSI/IEEE (AMERICAN NATIONAL STANDARDS INSTITUTE) THE SPECIFlCATIONS AND NEC. THE EQUIPMENT GROUNDING CONDUCTORS SHALL BE
2. ASTM (AMERICAN SOCIEfY FOR TESTING AND MATERWS) BONDED AT ALL JUNCTION BOXES, PULLBOXES. DISCONNECT SWITCHES, STARTERS, AND
3. ICE (INSULATED CABLE ENGINEERS ASSOCIATION) EQUIPMENT CABINEfS.
4. NEMA (NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION)
5. NFPA (NATIONAL FlRE PROTECTION ASSOCIATION) F. OTHER MATERIALS:
6. OSHA (OCCUPATIONAL SAFEfI' AMD HEALTH ADMINISTRATION) 1. THE SUBCOMRACTOR SHALL PROVIDE OTHER MATERV+LS, THOUGH NOT SPECIFlCALLY
7. UL �UNDERWRRERS LABORATORIES. INC.) DESCRIBED, WHICH ARE REQUIRED FOR A COMPLEfELY OPERATIONAL SYSTEM AND
8. AT& MOBILITY GROUNDING STANDARD tJD-00071 PROPER INSTALLATION OF THE WORK.
2. PROVIDE PULL BOXES AND JUNCTION BOXES WHERE SHOWN OR REQUIRED BY NEC.
1.4 SCOPE OF WORK: G. PANELS AND LOAD CENTERS:
A WORK UNDER THIS SECTION SHALL CONSIST OF FURNISHING ALL LABOR, MATERIAL, � qLL pq�,�EL DIRECTORIES SHALL BE TYPEWRITTEN.
AND ASSOCIATED SERVICES REQUIRED TO COMPLETE REQUIRED CONSTRUCTION AND BE
OPERATIONAL. pART 3 - EXECUTION
B. ALL ELECTRICAL EQUIPMENT UNDER THIS CONTRACT SHALL BE PROPERLY TESTED,
ADJUSTED, AND AUGNED BY THE SUBCONTRACTOR. 3.1 GENERAL:
C. THE SUBCONTRACTOR SHALL BE RESPONSIBLE FOR ALL EXCAVATING, DR4INING, A ALL MATERIAL AND EQUIPMENT SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE
TRENCHES, BACKFlILJNG, AND REMOVAL OF EXCESS DIRT.
D. THE SUBCONTRACTOR SHALL FURNISH TO THE OWNER WITH CERTIFICATES OF A FINAL MANUFACTURER'S RECOMMENDATIONS.
INSPECTION AND APPROVAL FROM THE INSPECTION AUTHORITIES HAVING JURISDICTION. 8. EQUIPMENT SHALL BE TIGHTLY COVERED AND PROTECTED AGPJNST DIRT OR WATER, AND
E. THE SUBCONTRACTOR SHALL PREPARE A COMPLEfE SET OF AS-BUILT DRAWINGS, AGAINST CHEMICAL OR MECHANICAL INJURY DURING INSTALLATION AND CONSTRUCTION PERIODS.
DOCUMENT ALL WIRING EQUIPMENT CONDITIONS, AND CHANGES WHILE COMPLEfING
THIS CONTR4CT. THE AS-BUILT DRAWINGS SHALL BE SUBMITTED AT COMPLEfION OF 3•2 a B� A��R � OR �EHINSTALLATION OF MATERIALS AND EQUIPMENT FURNISHED FOR THE
THE PROJECT.
ELECTRICAL SYSTEM SHALL BE INSTALLED 8Y EXPERIENCED WIREMEN, IN A NEAT AND
PART 2- PRODUCTS WORKMAN-LIKE MANNER.
B. ALL ELECTRICAL EQUIPMENT SHALL BE ADJUSTED, lWGNED AND TESTED BY THE
2.1 GENERAL: SUBCONTRACTOR AS REQUIRED TO PRODUCE THE INTENDED PERFORMANCE.
C. UPON COMPLEfION OF WORK, THE SUBCONTRACTOR SHALL THOROUGHLY CLEAN ALL
A ALL MATERIALS AND EQUIPMENT SHALL BE UL LISTED, NEW, AND FREE FROM HE�NSTALLATION NISHED AND READY OR PERATIONBRIS, CRATING OR CARTONS AND LEAVE
DEFECTS.
B. ALL ITEMS OF MATERL4LS AND EQUIPMENT SHALL BE ACCEPTABLE TO THE AUTHORIN 3•3 A�THEiSUBCONTRACTOR SHALL COORDINATE THE INSTALLATION OF ELECTRICAL ITEMS WfTH THE
HAVING JURISDICTION AS SURABLE FOR THE USE INTENDED.
OWNER-FURNISHED EQUIPMENT DELNERY SCHEDULE TO PREVENT UNNECESSARY DELAYS IN THE
C. ALL EQUIPMENT SHALL BEAR THE UNDERWRITERS LABORATORIES IABEL OF APPROVAL, TOTAL WORK.
AND SHALL CONFORM TO REQUIREMENT OF THE NATtONAL ELECTRICAL CODE.
3.4 INSTALV+TION:
D. ALL OVERCURRENT DEVICES SHALL HAVE AN INTERRUPTING CURRENT RATING EQUAL A CONDUff:
TO OR GREATER THAN THE SHORT CIRCUR CURRENT TO WHICH THEY ARE SUBJECTED, 1. ALL ELECTRICAL WIRING SHALL BE INSTALLED IN CONDUR AS SPECIFIED. NO
10,000 AIC AAINIMUM. VERIFY AVAILABLE SHORT CIRCUIT CURRENT DOES NOT EXCEED CONDUR OR TUBING OF LESS THAN 1/2 INCH TRADE SIZE.
THE RATING OF ELECTRICAL EQUIPMENT. 2. PROVIDE RMC OR EMT CONDUIT FOR ALL EXPOSED EXTERIOR CONDUIT UNLESS NOTED
OTHERWISE.
2.2 MATERIALS AND EQUIPMENT: 3. PROVIDE SCHEDULE 40 PVC OR RMC CONDUR BELOW GRADE 36" MINIMUM. ALL 90
DEGREE BENDS SHALL BE RMC. EXPANSION JOINTS ARE REQUIRED ON ALL CONDUR
A CONDUIT: RISERS.
1. RIGID MEfAL CONDUIT (RMC) SHALL BE HOT-DIPPED GALVANIZED INSIDE AND 4. USE GALVANIZED FLDCIBLE STEEL CONDUIT WHERE DIRECT CONNECTION TO EQUIPMENT
OUTSIDE INCLUDING ENDS AND THREADS AND ENAMELED OR LACQUERED INSIDE IN WITH MOVEMENT, VIBRATION, OR FOR EASE OF MAINTENANCE. USE LIQUID TIGHT, FLD(IBLE
ADDITION TO GALVANIZING. METAL CONDUIT FOR OUTDOOR APPLICATIONS. INSTALL GALVANIZED FLEXIBLE STEEL
2. LIQUID-TIGHT FLIXIBLE METAL CONDUIT SHALL BE UL LISTED. CONDUR AT ALL POINTS OF CONNECTION TO EQUIPMENT MOUNTED ON SUPPORT TO
3. CONDUIT CLAMPS, STRAPS AND SUPPORTS SHALL BE STEEL OR MALLEABLE IRON. ALLOW FOR EXPANSION AND CONTRACTION.
ALL FITTINGS SHALL BE COMPRESSION AND CONCREfE TIGHT NPE. GROUNDING 5. A RUN OF CONDUR BEtWEEN BOXES OR E�UIPMENT SHALL NOT CONTAIN MORE THAN
BUSHINGS WfTH INSUtATEO THROATS SHALL 8E INSTALLED ON ALL CONDUR THE EQUNALENT OF THREE QUARTER-BENDS. CONDUIT BEND SHALL BE MADE WITH THE
TERMINATIONS. UL LISTED BENDER OR FACTORY 90 DEGREE ELBOWS MAY BE USED.
4. NONMEfAWC CONDUIT AND FlTTINGS SHALL BE SCHEDULE 40 PVC. INSTALL USING 6. FlELD FABRICATED CONDUffS SHALL BE CUT SQUARE WITH A CONDUIT CUTTIN� TOOL AND
SOLVENT-CEMENT-TYPE JOINTS AS RECOMMENDED BY THE MANUFACTURER. REAMED TO PROVIDE A SMOOTH INSIDE SURFACE.
7. PROVIDE INSULATED GROUNDING BUSHING FOR ALL CONDUITS.
B. CONDUCTORS AND CABLE: 8. SUBCONTRACTOR IS RESPONSIBLE FOR PROTECTING ALL CONDUITS DURING
1. CONDUCTORS AND CABLE SHALL BE FLAME-RETARDANT, MOISTURE AND HEAT CONSTRUCTION. TEMPORARY OPENINGS IN THE CONDUIT SYSTEM SHALL BE PLUGGED OR
RESISTANT THERMOPLASTIC, SINGLE CONDUCTOR, COPPER, TYPE THHN/THWN-2, CAPPED TO PREVENT ENTR4NCE OF MOISTURE OR FOREIGN MATfER. SUBCONTRACTOR
600 VOLT, SIZE AS INDICATED, 12 AWG SHALL BE THE MINIMUM SIZE CONDUCTOR SHALL REPLACE ANY CONDUITS CONTAINING FOREIGN MATERIALS THAT CANNOT BE
USED. REMOVED.
2. 10 AWG AND SMALLER CONDUCTOR SHALL BE SOL1D OR STRANDED AND 8 AWG 9. ALL CONDURS SHALL BE SWABBED CLEAN BY PULLING AN APPROPRIATE SIZE AAANDREL
AND LARGER CONDUCTORS SHALL BE STRANDED. THROUGH THE CONDUIT BEFORE INSTALlATION OF CONDUCTORS OR CABLES. CONDUR
3. SOLDERLESS, COMPRESSION-TYPE CONNECTORS SHALL BE USED FOR TERMINATION SHALL BE FREE OF DIRT AND DEBRIS.
OF ALL STRANDED CONDUCTORS. 10. INSTALL PULL STRINGS IN ALL CLEAN EMPTI' CONDUITS. IDENTIFY PULL STRINGS AT EACH
4. STRNN-RELIEF SUPPORTS GRIPS SHALL BE HUBBELL KELLEMS OR APPROVED ��•
EQUAL. CABLES SHALL BE SUPPORTED IN ACCORDANCE WITH THE NEC AND CABLE 11. INSTALL 2' HIGHLY VISIBLE AND OEfECTABLE TAPE 12' ABOVE ALL UNDERGROUND
MANUFACTURER'S RECOMMENDATIONS. CONDUITS AND CONDUCTORS.
5. ALL CONDUCTORS SHALL BE TAGGED AT BOTN ENDS OF THE CONDUCTOR. AT ALL 12• CONDUITS SHALL BE INSTALLED IN SUCH A MANNER AS TO INSURE AGAINST COLLECTION
PULL BOXES, J-BOXES, EQUIPMENT AND CABINETS AND SHALL BE IDENTIFIED WITH OF TRAPPED CONDENSATION.
APPROVED PLASTIC TAGS (ACTION CRAFf, BRADY, OR APPROVED EQUAL). 13. PROVIDE CORE DRIWNG AS NECESSARY FOR PENETRATIONS TO AL10W FOR RACEWAYS
AND CABLES TO BE ROUTED THROUGH THE BUILDING. DO NOT PENEfRATE STRUCTURAL
MEMBERS. SLEEVES AND/OR PENEfRATIONS IN FlRE RATED CONSTRUCTION SHALL BE
C. DISCONNECT SWITCHES: EFFECTIVE�Y SEALED WITH FlRE RATED MATERIAL WHICH SHALL MAINTAIN THE FIRE RATING
1. DISCONNECT SWITCHES SHALL BE HEAVY DUTY, DEAD-FRONT, QUtCK-MAKE, p,FqSSAGEWOF WATER 3MOKE,EFlREEAND FUMESFL�ppLRMATERIAL�S�HALL BE�ULPAPPROVED
QUICK-BREAK, IXfERNALLY OPERABLE, HANDLE LOCKABLE AND INTERLOCK WITH
COVER IN CLOSED POSITION, RATING AS INDICATED, UL LABELED FURNISHED IN FOR THIS PURPOSE.
NEMA 3R ENCLOSURE, SQUARE-D OR APPROVED EQUAL
GENERAL ELECTRICAL NOTES
CONDUCTORS AND CABLE:
, ALL POWER WIRING SHALL BE COLOR CODED AS FOLLOWS:
DESGRIPTION ?4 120 VOLT
pf{qgE q BLACK
PHPSE 8 R�
PHASE C BLUE
NEUTRAL ��T�
GROUNOING GREEN
SPLICES SHALL BE MADE ONLY AT OUTLEfS, JUNCTION BOXES, OR ACCESSIBLE
R4CEWAY CONDULEfS APPROVED FOR THIS PURPOSE.
PULLING LUBRICANTS SHALL BE UL APPROVED. SUBCONTRACTOR SHALL USE NYLON OR
HEMP ROPE FOR PULLING CONDUCTOR OR CABLES INTO THE CONDUfT.
4. CABLES SHALL BE NEATLY TRPJNED, WITHOUT INTERIACING, AND BE OF SUFFlCIENT
LENGTH IN ALL BOXES ac EQUIPMENT TO PERMIT MAKING A NEAT ARRANGEMENT.
CABLES SHALL BE SECURED IN A MANNER TO AVOID TENSION ON CONDUCTORS OR
TERMINALS. CONDUCTORS SHALL BE PROTECTED FROM MECHANICAL INJURY AND
MOISTURE. SHARP BENDS OVER CONDUIT BUSHINGS ARE PROHIBIiED. DAMAGED CABLES
SHALL BE REMOVED AND REPLACED AT THE SUBCONTR4CTOR'S DCPENSE.
C. DISCONNECT SWITCHES:
. INSTALL DISCONNECT SWITCHES LEVEL AND PLUMB. CONNECT TO WIRING SYSTEM AND
GROUNDING SYSTEM AS INDICATED.
D. GROUNDING:
ALL METALLIC PARTS Of ELECTRICAL EQUIPMENT WHICH DO NOT CARRY CURRENT SHALL
� BE GROUNDED IN ACCORDANCE WITH THE REQUIREMENTS OF THE BUILDING
MANUFACTURER, AT&T IAOBILIiY GROUNDING STANDARD ND-00071, ND-00135, AND THE
NATIONAL ELECTRICAL CODE.
2. PROVIDE ELECTRICAL GROUNDING AND BONDING SYSTEM INDICATED WRH ASSEMBLY OF
MATERL4LS, INCLUDING GROUNDING ELECTRODES, BONDING JUMPERS AND ADDITIONAL
ACCESSORIES AS REQUIRED FOR A COMPLEfE INSTALLAl10N.
3. ALL GROUNDING CONDUCTORS SHALL PROVIDE A STRAIGHT DOWNWARD PATH TO
GROUND WITH GRADUAL BEND AS REQUIRED. GROUNDING CONDUCTORS SHALL NOT BE
LOOPED OR SHARPLY BErtT. ROUTE GROUNDING CONNECTIONS AND CONDUCTORS TO
GROUND IN THE SHORTEST AND STRAIGHTEST PATHS POSSIBLE TO MINIMIZE TRANSIENT
VOLTAGE RISES.
4. BUILDINGS AND/OR NEW TOWERS GREATER THAN 75 FEEf IN HEIGHT AND THE MAIN
GROUNDING CONDUCTORS ARE REQUIRED TO BE ROUTED TO GRADE, THE
SUBCONTRACTOR SHALL ROUTE TWO GROUNDING CONDUCTORS FROM THE ROOFfOP,
TOWERS, AND WATER TOWERS GROUNDING RING, TO THE EXISTING GROUNDING SYSTEM,
THE GROUNDING CONDUCTORS SHALL NOT BE SMALLER THAN 2/0 AWG COPPER.
ROOFfOP GROUNDING RING SHALL BE BONDED TO THE EXISTING GROUNDING SYSTEM,
THE BUILDING STEEL COLUMNS, LJGHTNING PROTECTION SYSTEM, AND BUILDING MAIN
WATER LINE (FERROUS OR NONFERROUS MEfAL PIPING ONLI�.
5. TIGHTEN GROUNDING AND BONDING CONNECTORS, INCLUDING SCREWS AND BOLTS, IN
ACCORDANCE WITH MANUFACTURER'S PUBLISHED TORQUE TIGHTENING VALUES FOR
CONNECTORS AND BOLTS. WHERE MANUFACTURER'S TORQUING REQUIREMENTS ARE NOT
AVAIIABLE, TIGHTEN CONNECTIONS TO COMPLY WITH TIGHTENING TORQUE VALUES
SPECIFlED IN UL TO ASSURE PERMANENT AND EFFECTNE GROUNDING.
6. SUBCONTRACTOR SHALL VERIFY THE LOCATIONS OF GROUNDING TIE-IN-POINTS TO THE
EXISTING GROUNDING SYSTEM. ALL UNDERGROUND GROUNDING CONNECTIONS SHALL BE
MADE BY THE IXOTHERMIC WELD PROCESS AND INSTALLED IN ACCORDANCE WITH THE
MANUFACTURER'S INSTRUCTIONS.
7, ALL GROUNDING CONNECTIONS SHALL BE INSPECTED FOR TIGHTNESS. D(OTHERMIC
WELDED CONNECTIONS SHALL BE APPROVED BY THE INSPECTOR HAVING JURISDICTION
BEFORE BEING PERMANEMLY CONCEALED.
B. APPLY CORROSION-RESISTANCE FlNISH TO FIELD CONNECTIONS AND PLACES WHERE
FACTORY APPLIED PROTECTIVE COATINGS HAVE BEEN DESTROYED. USE KOPR-SHIELD
ANTI-OXIDATION COMPOUND ON ALL COMPRESSION GROUNDING CONNECTIONS.
9. A SEPARATE, CONTINUOUS, INSUTATED EQUIPMENT GROUNDING CONDUCTOR SHALL BE
INSTALLED IN ALL FEEDER AND BRANCH CIRCUITS.
10. BOND ALL INSULATED GROUNDING BUSHINGS WITH A BARE 6 AWG GROUNDING
CONDUCTOR TO A GROUND BUS.
11. DIRECT BURIED GROUNDING CONDUCTORS SHALL BE INSTALLED AT A NOMINAL DEPTH
OF 36° MINIMUM BELOW GRADE, OR 6' BELOW THE FROST LINE, USE THE GREATER OF
THE TWO DISTANCES.
12. ALL GROUNDING CONDUCTORS EMBEDDED IN OR PENETRATING CONCREfE SHALL BE
INSTALLED IN SCHEDULE 40 PVC CONDUIT.
13. THE INSTALLATION OF CHEMICAL ELECTROLYTIC GROUNDING SYSTEM IN STRICT
ACCORDANCE WffH MANUFACTURER'S INSTRUCTIONS. REMOVE SEAUNG TAPE FROM
LEACHING AND BREATHER HOLES. INSTALL PROTECTIVE BOX FLUSH WITH GRADE.
14. DRNE GROUND RODS UNTIL TOPS ARE A MINIMUM DISTANCE OF 36' DEPTH OR 6"
BELOW FROST L1NE, USING THE GREATER OF THE lW0 DISTANCES.
15. IF COAX ON THE ICE BRIDGE IS MORE THAN 6 Ff. FROM THE GROUNDING BAR AT THE
BASE OF THE TOWER, A SECOND GROUNDING BAR WILL BE NEEDED AT THE END OF
THE ICE BRIDGE, TO GROUND THE COAX CABLE GROUNDING KRS AND IN-UNE
ARRESTERS.
16. SUBCONTRACTOR SHALL REPAIR, AND/OR REPIACE, EXISTING GROUNDING SYSTEM
COMPONENTS DAMAGED DURING CONSTRUCTION AT THE SUBCONTRACTORS EXPENSE.
3.5 ACCEPTANCE TESTING:
A. CERTIFlED PERSONNEL USING CERTIFlED EQUIPMENT SHALL PERFORM REQUIRED TESTS AND
SUBMIT WRITfEN TEST REPORTS UPON COMPLETION.
B. WHEN MATERIAL AND/OR WORKMANSHIP IS FOUND NOT TO COMPLY WITH THE SPECIFIED
REQUIREMENTS, THE NONCOMPLYING ffEMS SHALL 8E REMOVED FROM THE PROJECT SITE
AND REPLACED WITH (TEMS COMPLYING WITH iHE SPECIFlED RE�UIREMENTS PROMPTLY
AFTER RECEIPT OF NOTICE FOR NON-COMPLWJCE.
C. TEST PROCEDURES;
1. ALL FEEDERS SHALL HAVE INSULATION TESTED AFTER INSTALLATION, BEFORE
CONNECTION TO DEVICES. THE CONDUCTORS SHALL TEST FREE fROAA SHORT CIRCUITS
AND GROUNDS. TESTING SHALL BE FOR ONE MINUTE USING t000V DC. PROVIDE
WRITTEN DOCUMENTATION FOR ALL TEST LISTED TO SUBCONTR4CTOR.
2. PRIOR TO ENERGIZING CIRCURRY, TEST WIRING DEVICES FOR ELECTRICAL CONTINUITY
AND PROPER POLARITY CONNECTIONS.
3. MEASURE AND RECORD VOLTAGES BETWEEN PHASES AND BETWEEN PHASE CONDUCTORS
AND NEUTRALS. SUBMIT A REPORT OF MAXIMUM AND MINIMUM VOLTAGES
4. PERFORM GROUNDING TEST TO MEASURE GROUNDING RESISTANCE OF GROUNDING
SYSTEM USING THE IEEE STANDARD 3-POINT 'FALL-OF-POTENTIAL' METHOD. PROVIDE
PLOTfED TEST VALUES AND LOCATION SKEfCH. NOTIFY THE ENGINEER IMMEDIATELY IF
MEASURED VALUE IS OVER 5 OHMS. �� ���
� �-_
��
� at&t
�__�/
188 INVERNESS DRNE WEST
SURE 400
ENGLEVf00D. CA 80172
�.
BLACK & VEATCH
304 INVERNESS WAY SOUTH
SUITE aoo
ENGLEWOOD. CO 80112
C SAl
�MARLES STECKLY ARGMREGTURE, lae.
ARCHITECTURE - PLANNING - DESIGN
sass souni zuac s�r, suire zao
LITTLETON. COLORADO 80127
OFFICE: 303.932.9974
FAX: 303.932.6561
PROJECT N0: COU4068
DR4WN 8Y: SGP
CHECKED BY: CS
SITE NAME:
WEST VAIL
COU4066
2077 N. FRONTAGE RD. W.
VAIL, CO 81657
LTE-ROOFTOP
SHEET TRLE:
GENERAL
ELECTR►CAL
NOTES
SHEET NUMBER: