Loading...
HomeMy WebLinkAboutB12-0040 REV9 plan approvedTRANSMITTAL FORM Project Street Address: __________ ______________________________ ___________ (Number) (Street) (Suite #) Building/Complex Name: ________________________________ Revised ADDITIONAL Valuations (Labor & Materials) (DO NOT include original valuation) Building: $_____________________ Plumbing: $_____________________ Electrical: $_____________________ Mechanical: $_____________________ Total: $_____________________ Description / List of Changes: __________________________________________________ __________________________________________________ __________________________________________________ __________________________________________________ __________________________________________________ __________________________________________________ (use additional sheet if necessary) Permit #(s) information applies to: Attention: ( ) Revisions ( ) Response to Correction Letter ____________________________________ __________________________ ___attached copy of correction letter ( ) Deferred Submittal ____________________________________ __________________________ ( ) Other Revision Submittals: 1. “Field Set” of approved plans MUST accompany revisions. 2. No further inspections will be performed until the revisions are approved & the permit is re-issued. 3. Fees for reviewing revisions are $55.00 per hour (2 hour minimum), and are due upon issuance. Date Received: 01-Oct-11 Department of Community Development 75 South Frontage Road Vail, CO 81657 Tel: 970-479-2128 www.vailgov.com Development Review Coordinator For Office Use Only: Fee Paid: _________________________________________ Received From: ____________________________________ Cash _________ Check # ___________ CC: Visa / MC Last 4 CC # _________ exp. date: ________ Auth # _________ Contractor Information Business Name: ________________________________________ Business Address: ______________________________________ City _____________________ State: _______ Zip: ____________ Contact Name: _________________________________________ Contact Phone: _________________________________________ Contact E-Mail: _________________________________________ I hereby acknowledge that I have read this application, filled out in full the information required, completed an accurate plot plan, and state that all the information as required is correct. I agree to comply with the information and plot plan, to comply with all Town ordinances and state laws, and to build this structure according to the town's zoning and subdivision codes, design review ap- proved, International Building and Residential Codes and other ordinances of the Town applicable thereto. X___________________________________________________ Owner/Owner’s Representative Signature (Required) Applicant Information Applicant Name: _______________________________________ Applicant Phone: _______________________________________ Applicant E-Mail: _______________________________________ 00333 - Vail Public Library - 292 W Meadow Dr 292 West Meadow Drive Vail CO 81657 Due: Ref #: Cost Code: COR:N/A N/A 11/6/2012 Priority: Status:Open HighDescr: RFI Type: Project: Tie Rod Welding FC - Field Condition To:Mr. Danny Swertfeger Architectural Services, P.C. PO Box 385 Edwards CO 81632 From: QUESTION: Due to the limited space between the new tie rod and the existing tube steel/channel we cannot complete the bottom weld under the tie rod to the vertical plate at F1 & F7 both East and West sides. Option 1 - The single weld on top is sufficient and the second weld is not needed Option 2 - Provide new detail for additional connection to tube steel ANSWER: Page 1 of 1 Evans Chaffee Construction Group, Inc. PO Box 8266 77 Metcalf Road Avon CO 81620 Phone: 970-845-0466 Fax: 970-845-0465 REQUEST FOR INFORMATION Document: Date: 079 11/6/2012