Loading...
HomeMy WebLinkAboutDRB070355 Retaining Wall plansWIIIIIIIIIIIIII = THE WREN ASSOCIATION ?miuiui�= NORTH RETAINING WAI_1_S a III III II () W NAM I .J Illiilll IIII z m3 CONeTRUC�ION PLANS aIIIII (, nw IIII) II I z Q P IIW w SF=PTF=ME F =R, 2007 a L c 0 0 N ' � 'fir � >, t/�>A � � � ��►y •` � ��� �`�' '� a` GENERAL CONSTRUCTION NOTES 1. See Details sheets for additional details and notes. 2. All 90' vertical bends in conduit shall have a 3' minimum radius. All 90' horizontal conduit bends shall have an 5' minimum radius. 3. All trenches shall be back filled and compacted to 95% standard proctor. Backfill material shall be soil free of top soil, organic material, frozen material and all non- structural material. 4. When multi le conduits are placed in the some trench, Contractor to provide minimum 12" separation between CATV7Telephone conduits and Electric conduits. Refer to detail sheets. 5. Select fill denotes native material with no rocks larger than 2" in diameter and approved by the Engineer. If no select fill exists on site, Contractor to use 3/4" road base. 6. Provide 2' of select back fill above conduits and lay warning tape as required by the Utility Companies. 7. Provide 10' clear area for electric transformer and switch gear doors. 8. It is the Contractors responsibility to coordinate construction with all Shallow Utility Companies and to have all work done by the Contractor approved and accepted by each respective Shallow Utility Company. 9. The Contractor shall install all conduits, vaults, pads, pull boxes and pull strings. The gas lines, transformers, switch gears and all other to be installed by the respective Utility Company. 10. The Contractor shall install conduits for the electric, phone and cable lines as shown on the plans. 11. All work shall comply to the individual Shallow Utility Companies rules and regulations. 12. The Contractor shall verify location and elevation of all existing utilities, culverts and underdrains prior to construction. 13. The Contractor shall repair and /or replace existing underdrains disturbed by construction to the satisfaction of the Engineer. 14. The Contractor shall install pull strings in all conduits with the exception of joint trench service stubs. 15. It is the Contractor's responsibility to field locate all utilities, irrigation lines, electrical lines, light poles, etc. on site prior to construction. 16. The Contractor is warned that conflicts with existing utility services may exist. Prior to beginning any construction, the Contractor shall contact all appropriate utility companies for line locations. He shall then locate all utilities (including depth). Any conflicts with the proposed construction shall be brought to the attention of the Engineer so that minor line or grade changes can be made to eliminate any conflicts with these existing utilities. All existing utilities shall be protected from damage by the Contractor at no expense to the Owner. 17. Contractor shall obtain at his expense all permits and inspections which are necessary to perform the proposed work 18. All construction shall conform to municipal or district standards and specifications and be subject to construction observation by their representatives. Copies of municipal and district standards must be obtained by the Contractor. 19. Contractor shall not scale drawings for construction purposes. Any missing dimensions or discrepancies in plans, field staking, or physical features shall be brought to the attention of the Engineer. If Contractor proceeds with the work without notifying the Engineer, he does so at his own risk. 20. Observations of the work in progress and on site visits are not to be construed as a guarantee or warranty by the Engineer of the Contractor's contractual responsibilities. 21. The Owner will provide certain construction staking. The Contractor is advised that this may not be all of the stakes he will need. Additional staking will be at the Contractor's expense. 22. Safety is the responsibility of the Contractor. The Engineer is not responsible for safety in, on, or about the project site, nor for compliance by the appropriate party with any regulations relating hereto. 23. The Contractor shall provide all lights, signs, barricades, flagmen, or other devices necessary to provide for public safety in accordance with the current Manual on Uniform Traffic Control Devices or as required by the Town of Vail. The Contractor is to provide a Traffic Control Plan to the Town of Vail and receive approval of the plan prior to the commencement of any construction within the road right -of -way. 24. Contractor is to provide dewatering for groundwater encountered during excavation and trenching as required. 25. The General Contractor is to keep a copy of the construction activity plan at the site at all times. 26. Contractor to protect all trees that are to be preserved during construction operations. 27. Contractor shall restore and /or replace all disturbed landscaping and sod to a condition equal to or better than the pre- construction state and to the satisfaction of the owner. 28. Contractor to install, inspect and maintain sediment control measure to ensure that sediment -laden water does not leave the site. Certain sediment control details have been shown on the detail sheet. These details may not be all the measures necessary to provide adequate sediment and erosion control. VVs ` �3F VAS DESIGN REVEElAt STAFF APPROVAI- iari - _ a 0 v) E Z 0 0 N N w M � 0 F. as :alt►`, J Q W V1 • 0 0 () < LW i W. 0 W Z I V) / • • i w o TZ Fm SHEET INDEX COVER SHEET EXISTING CONDITIONS PLAN OVERALL GRADING AND DRAINAGE PLAN RETAINING WALL SECTIONS AND DETAILS CONSTRUCTION SECTIONS AND DETAILS . SHEET C01.0 262 -4034 SHEET �I co I ON I o SHEET 1_ 947 -5428 0 � 468 -6862 GLENN PALMER, BOB w 926 -3373 DAVE YOUNG w 0 0 Z 0 J Q W V1 • 0 0 () < LW i W. 0 W Z I V) / • • i w o TZ Fm SHEET INDEX COVER SHEET EXISTING CONDITIONS PLAN OVERALL GRADING AND DRAINAGE PLAN RETAINING WALL SECTIONS AND DETAILS CONSTRUCTION SECTIONS AND DETAILS . SHEET C01.0 262 -4034 SHEET CO2.0 418 -8248 SHEET CO3.0 r m SHEET C04.0 947 -5428 SHEET CO5.0 468 -6862 PROJECT CONTACTS XCEL ENERGY (GAS) COMCAST (CATV) EAGLE RIVER WATER AND SANITATION DISTRICT HOLY CROSS ENERGY (ELECTRIC) QWEST (TELEPHONE) CIVIL ENGINEER, AEI GEOTECHNICAL ENGINEER, HP GEOTECH, GLENWOOD SPRINGS THE WREN ASSOCIATION (OWNER) LAND SURVEYOR, ALPINE ENGINEERING INC. - TOWN OF VAIL CONSTRUCTION INSPECTION - LOREN VAWSER (970) 262 -4034 DAVID EVANS (970) 418 -8248 FRED HASLEE (970) 477 -5449 LIBBY COWLING (970) 947 -5428 SAM TOOLEY (970) 468 -6862 GLENN PALMER, BOB HERBST - (970) 926 -3373 DAVE YOUNG (970) 945 -7988 DEREK SCHMIDT (970) 845 -2382 ROB LEE (970) 926 -3373 LEONARD SANDOVAL (970) 390 -4677 p N L CL CL 0 0 (V 0 N W Z FL NOTES: 1) DATE OF SURVEYS: EAGLE VALLEY SURVEYING, ALTA 2926, DECEMBER 2004, ALPINE ENGINEERING SUPPLEMENTAL SURVEY AUGUST, 2006 2) FIRST AMERICAN HERITAGE TITLE CO. POLICY NO. EG W 6 DATED 3/13/00 WAS USED FOR ALL TITLE AND EASEMENT INFORMATION. 3) NOTICE: ACCORDING TO COLORADO LAW YOU MUST COMMENCE ANY LEGAL ACTION BASED UPON ANY DEFECT IN THIS SURVEY WITHIN THREE YEARS AFTER YOU FIRST DISCOVER SUCH DEFECT. IN NO EVENT, MAY ANY ACTION BASED UPON ANY DEFECT IN THIS SURVEY BE COMMENCED MORE THAN TEN YEARS FROM THE DATE OF THE CERTIFICATION SHOWN HEREON. 4) 0.5' OF SNOW ON LOT AT TIME OF SURVEY; SOME FEATURES MAY EXIST BENEATH SNOW THAT ARE NOT SHOWN ON THIS DRAWING. 5) BASIS OF ELEVATION: NATIONAL GEODETIC SURVEY NAVD 88 CONTROL PT. "SPRADDLE" ELEV. = 8287.40 6) BASIS OF BEARINGS: A LINE CONNECTING THE NW CRN OF THE WREN PARCEL AND N 1/4 CRN. SEC. 8, T5S, R80W, 6TH P.M. (SEE DRAWING) 7) PER TOWN OF VAIL COMMUNITY DEVELOPEMENT DEPARTMENT, BUILDING SETBACKS ARE AS FOLLOWS: FRONT: 20' SIDES: 20' REAR: 20' 8) ADDRESS: 500 S. FRONTAGE ROAD. 9) ALL UTILITY LOCATIONS ARE PER FIELD LOCATES OF MARKINGS BY THEIR RESPECTIVE COMPANIES AND ARE VERY APPROXIMATE. —c GAS LINE T PHONE LINE w WATER LINE ELECTRIC LINE INDICATES 0.2' APPRX, TRUNK DIA. CONIFEROUS TREE INDICATES 0.5' APPRX. TRUNK DIA. CONIFEROUS TREE INDICATES 0.5' APPRX. TRUNK DIA. DECIDUOUS TREE �— INDICATES 1.0' APPRX. TRUNK DIA. DECIDUOUS TREE INDICATES 1.0' APPRX. TRUNK DIA. CONIFEROUS TREE INDICATES 1.5' APPRX. TRUNK DIA. CONIFEROUS TREE SURVEYOR'S CERTIFICATE To: Wren Board Association This is to certify that this mop or plat and the survey on which it is based were made in accordance with "Minimum Standard Detail Requirements for ALTA /ACSM Land Title Surveys," jointly established and adopted by ALTA, ACSM and NSPS in 1999, and includes Items 3, 4, 5, 6, 7(a), 7(1), 8, 9, 10, 11(a), and 11(b) of Table A thereof. Pursuant to the Accuracy Standards as adopted by ALTA, NSPS, and ACSM and in effect on the dote of this certification, the undersigned further certifies that proper field procedures, instrumentation, and adequate survey personnel were employed in order to achieve results comparable to those outlined in the "Minimum Angle, Distance, and Closure Requirements for Survey Measurements Which Control Land Boundaries for ALTA /AGSM Land Title Surveys." LEGAL DESCRIPTION Commencing at the Northwest corner of the NE 1/4 of said Section 8, Township 5 South, Range 80 West of the Sixth Principal Meridian, County of Eagle, State of Colorado; thence S00'01'06 "E and along the West line of said Northeast one — quarter 583.82 feet to a point of intersection with the Southerly right —of —way line of Interstate Highway 70 and the true point of beginning; thence continuing along the aforesaid course 347.62 feet; thence N89'58'54 "E 189.81 feet; thence NOO'01'06 "W and along a line parallel to the West line of said Northeast one — quarter 284.59 feet to a point of intersection with Southerly right —of —way, thence N71'38'54 "W and along said Southerly right —of —way 200.00 feet to the true point of beginning; containing 59,999.35 sq. ft. or 1.377 acres, more or less. SCALE: 1 = 20' CONTOUR INTERVAL = 2.0' APOLLO PARK A PART OF TRACT "D" VAIL VILLAGE FIFTH FILING RECORDED IN 8274, P697 SEPTEMBER 5, 1978 TRACT A VAIL VILLAGE FIFTH FILING RECORDED AT FILE NO. 102538 NOVEMBER 12, 1965 N 1/4 CRN. SEC. 8 SEC. 8, T5 S, R$OW, 6TH P.M. N T e R AL PIPE. U.S. S CADASTRAL BLM 8223.7 ,S SS GONG. CURD WT (sot/ FRr A T E 197 82.23.8 82241 \ ONTgGE R04D) \ 11224.3 822a. Wae W ER O• t1 r APPROX. 450' +/— TO 0 Lo, INTERSECTION GORE CREEK `G ' \ 822 \ °'6 ) � DRIVE. �.` IUC, ux �` 8225.2 TRAMS _.. -. G 'z 4 x W iP i / �,. , ' 8225.3 o' R $ l°�� EPy 8225.8 �p FND PIN &RED PLASTIC CA ,� 2e ~ � 1 WRO CUT e 20 Cn LS #24218 f j S � 1c r °`` Fly 8225.9 i c y ` Y A 22, r ' + �<9. � 03` 4 .3 F °\ -10• Roar X0 `3 822s.t ✓ �c1 8226. JAG em U n n GO ' I I I I I I I I I M �` I I I I I I Z W eLOac DLO« PuWTrn LL W WO' I I I I I I I —_ 7.G• Non 1fl RET. WALL CEN1ERUNE 14' HOLY CROSS z a I ( I I I LLJ ° ° w EIEC RANS R MP DLaa RL7, WALL O VERHEAD G. EASEMENT ca+o. RET. wALL (8245, PI 2/27/'76) \ �) I I 1.0' cr wAU (� I I W. wAU sruas �• J �a ~ I — — I DRAW 1 PERIMETER POOL DECK \ PARKING DECK OUTLINE 21020 SQ. FT. 17 PARKING SPACES TOP LEVEL 18 PARKING SPACES LOWER LEVEL awE or-- PAW Z ° I o, C I I I I I I I I I rn l ( I I I I I I I I I NRS I I I I I I I I I J ' O OPEN TO SPA DECK N I LOWER LEVEL. {{ . . IRM FENCE /(M) em U n n GO ' z M M 0 a .0 0 Z W W aL a LL W WO' W W N z d Non � r� N N ° z a o LLJ ° ° w r z LAIN j/4 REBAR O V) Q r _ n � _ QQ 2� .:".RaQCyii•, \ GRAVEL \ \ \ O O W\ \ Q O Z �- 0 O Z U \\ UJ \\ > �ft�so*Z STAIRS STMD PFPE I I I 8211. K� I�T �i ~ 1 GAS I I i 8211.5 1 ra 4 STORY PREFABRICATED CONCRETE STRUCTURE I x II 1 PERIMETER BUILDING OUTLINE 17,800 SQ. FT. 1 8211.3 I II O REM L99 O• ! E ' I I II M - 8211.0 I I I I 8 it I xaz112 os II P I II it X10.4 - - -- 9.6• 4 — — — — — — — — — — — — — — — — — — — -" ----------- - - - - -- \ II I l �,,, .... „_. �— — — _ 8210 ^.. `.. "'-• L --.. "" - [ L GABICW RIXX _ \ -- -- .-._ — _. __ WA .-._._ _ _._ — _ r �---�� LL (M) I amp s _ _ _ q ______ ---- - - - - -- — — — — — — NE 15' PEDESTRIAN GFAWL , •,,,,sue' ' ",� 7'S a .... '"�• '-�, z� . ^— i PFIIHWAY EASEMENT (8548, P153 1/22/91) .-.� .. .�— �. �� -r " ,�+� :.r"•�a►. --,�. I '>Sp' STREAM SEMACK `^ -� \ � J' (M) .Y� ? � , _ _ - .... --_ _..- __ — �•` �. — — 8180.....— _.. _. \ • \ 0.08 9*58'54'�9_.81 TOM. OF NAIL\ APPROX LOCA1 OL'GIGN REVIEVNI 0 ems° EDGE Dr GREIX - -- TERP�OLATED F.EA.A. TOWN GF VNL STAFF APP OVAL ® 'BOIINBARY D FLOODWAY V MAP DATED MAY CT TO 2, 1993 S EVATONS CONVERTe'D =WAY ERTICAL DATUM. SUBJE CHAHCE �� (}Ja) a1 Z 0 w � � o 0 W N 0 O O ,— z n O O N O Lo o' K 0 n O 0 0 . W WW 0 O 3: 0 z W V) W _ 0 p 4 0 0 U 0 SHEET C -02.0 J SHEET C -02.0 J GRADING AND DRAINAGE SCALE: 1" = 20' 82.27.5 z o o�10 n V z� ��yy ZA1 W N W WNN t� Z� M ' z (" DO V NW0 � O z¢� LLI w q �, /` �. //4223.18 %'' •i' -` COORDINATE ALL r - • `" 0°° `" N tea' x DEMOLITION AND 3p I I I I I 1 I I ~• `• Y ,,� -�`�, ` `, I I I �-. F'68 ''�,.. / CONSTRUCTION WITH THE Z G+ATE u \ ( % \ > \ OWNERS LANDSCAPE �� �•�+r'' / / DEU r7 AND f -' 223.55+ / s i i I a Zsa i. %„�' DINNERS 07IO THE /'�/ 'SE x �; !v DEPARTMENT FOR THE �' DEPARTM FOR THE = j %' / \ REMOVAL AND Z DETAILS SHEET FOR REPLACEMENT OF ALL f � �� � N / TYPICAL ASPHALT SECTION DISTURBED FEATURES. J 17 PARKING SPACES TOP LEVEL Match GmEP.4 �/ TIPICAL ASPHALT SECDgi `• '� DISTURBED FEATURES � -. 17 PARKING SPACES LOWER LEVEL AHD �a �\ \FND PLAIN #4 REBAR EL Match Grade OT �/ O 1 'iz - Jet- 221.2 \ LEVEL /1 n i "ilius \22192+ Existing Conc gg /� \ \ FND PLAIN # REBAR 0 w 2 1 PROPOSED \ tt Z22 :k::i : / 1 x t ti6 i �2" "tl�e 22120+ . \ \ Q 1 I I I i I I % �F!ROPOSED LF. OF R a,b nNt PRC�pg� l ~'_ I i I I I I I WMDPGGi(T1PJ �,/'iq Ya.8220. 32 23 I I I I , I 1 /w sagas la„.azla.eo 1r waw.lron °"-•� `'<: __..� R= "821 -9:95 \221.92+ 5 222.63 I I I I I 1 i `. •' w � Sump O PROPOSED _. i I i i i f OPOSED Curb Inlet PRO , ED ''`` N07E5 /2 T �y0. x § l • �'" `\ \\ `, i I GUARDPOST(TYP.) •,83- 6 L.F. OF Rim = 8220.32 23 L.F. Or `-- RAMP SDR35 SDR35 Inv -- 8212.50 12" Ductile Iron - _ U Z Q BANS ® 2.0% @ w/ 2' Sump Pipe 29.1 G L \ \ \ \\ ( I 2ET. wALL - sTURS - _a -- _ , v 4• AV I �, \ �. \ I i I I i I _ 4 .• a l \ \ I _ n I '1 _ --- - - - - -- I--- I ___' I I I I PROPOSED D .uN , * r 16 \ \ \ 7 T \ r - r________ --- \ \\ I I I / /' �} o -.�^- _ -__ - - - - -' 2# InNL i _ r .. :• : \ \\ \ I I - T_ 9' SDR35 R4n92aD.2 ha• ( i v I V) t \ 29 A h .azoe Do P�RDP « i r ;Z S. + i \ M SLOPE LF.O Rkn-820D.20 I ` i '_ " LANT R PERIMETER POOL DECK PARKING DECK OUTLINE 21020 SO. FT. I LF. F a � ftl1f "/' a 3s Pw I ?: ::k: 4 vvv I I i SEE GENERAL SEE v • 2 \ ` 17 PARKING SPACES TOP LEVEL PUN SHEET OF WILL I `\ 18 PARKING NOTES #2 ?� SPACES LOWER LEVEL oONSiRUCTICN SEOnON4 EocE a i i / \ # DETMIS AND NOTES PROPOSED \\ .,.,- R EW�W,q Pa�tlo� ' � `/ r canm.t. ELEC. RAMP CK RET W LL 214 \ \ \ V I I i TRANS. � R� j i i i i i i i i I PROPOSED t FENCE 8 GRAVEL U I s x I 1 I I I I I I 7e SO aF `� \ WALK I I I I I - T-RS 1r mRas i t I CONC. \ \ w I i i i i PVC o Lo% 1 I RET. WALL a y t I I 1 I I I I / I - \ J I I I I PROPOSED 0I- X LIS �q QoW SLbdroN STAIRS e }) 1 .3 � - - ---- - -- --- y 3 4• wa.hW i` Rock with Passing a #200 rs' __ I - - _ I - ----- -- - - -- h ha soq. fn.a -- 2 � 9 33 v v V 1 OPEN TO SPA °EC" I I PROPOSED PROPOSED - - D AIN T� - �� :Ri t1 $ 16 \ t LOVAR LEVEL C " - - - ._ - - - - - - - 2x2 Inlet PROPOSED I :fav�$20 0 -1 - - - - - 30 L.F. OF Gravel (Y i ti - Rim' Inlet 2 S 'GE j 5 J j ' PRDPgsEn 6" SDR35 Inv = 8206.00 Subdrain PROPOSED I s 1 r� PVC SLOPE :`. PERFORATED x 8zos. ' co VARIES 8 Area Inlet - °�- ,.._,. -•/ o Rim = 8209.20 I vo WOOD � `s1eoR�Alx PVC Dx t' �� PROPOSED • •� �,,.. `. POOL Ir Inv= Varies w/ I \ 'f rCUP K OUTLINE 21020 28 L.F. OF I P OOL oEac PAwanc aN resort eELOw NUE m� . -za » SO. FT. 12 " SDR35 6 SDR35 PVC f 14 PARKING SPACES LOWER LEVEL =ND V .-- .,-, PVC ®1.0% I _ ' L ' . °� ° SEE RETAINING WALL �-- I L'� 11 j DWNG t h e 1.7x CUP LEVEL PLAN SHEET OF WALL P00 I f 1 Q f DEC r "RS _ y - I R LEVEL CONSTRUCTION SECTIONS, EDGE OF °° i n1AZM11 - DETAILS AND NOTES PROPOSED PATIO ' 2 Poo` ° Existing / Pa Patio B N qNG ..-•" ______ PLANTERS - - - Ir w / 5 PUNTER /�'j " Concrete ` U srAws 1 RAMP " 8 i ' I I i I � SPLIT RAIL m in TAR P ER /�p�.� .-� FENCE (TYP) STAND Prof i I EXIT (S ASPN ST AM ( b 1 t I I I I PROPOSED O I I I I I 76 L.F. OF i 7 12" SDR35 STAIRS � I uE r 4 STORY PREFABRICATED CONCRETE STRUCTURE I ! I 8z11s i i i ( PVC @ 1.0% som PERIMETER BUILDING OUTLINE 17,500 SO. FT. � 4.} � 1 I i az i I I p 1"C31ftf�a OF `v",�1t- I I PROPOSED I ° •; •::. D ES IGN t E V IEI N PROPOSm I I I I Free Draining Gravel Subdrain >>�ttti 34LF. OF -- - - - __ ®1.O% Using 3/4 Washed '' a I SDR35 x 821. �� i i P `� O ' °X - _ _ _ _ _ _ _ _ _ Rock with G2% Passing a #200 N - - - Seive or Otherwise as S ecified - DATE: - -- 4 1 o ii --- - - - - -- t " b the Soils Engineer 11 - - j I (n E e L F. of Y II PEAFCIRATED C l PNOIRE 1 I 4• SDR35 P {{ . C: C. Pal z .0 1 E l OOORDRUTE ILL (1 e�1 A'N ( O DEMOU110 In N AND } ® 7 E i y @ (n OWNRS � AN AP n+E � �''� 11 I IRON FENCE \ S m 1 o F E h I I �o.L F., aF w Cr RFIIOVAL IND II SOlFD4 SOR55 ( L FEAi�Ulif.�S, y., I I PVC Og105 ` ) TYP I -------------------------- -•----- ------------ - - --•- 1 ------------------------- POOL GENERAL NOT PROPOSED 2 Inlet ° PERFORATED 2 �' `' OF Rim 8209 4 -.._ •- ____- -- - - -- -- w Pwa. ER.c ORATED 8 �9 Inv--8204.9 0 - -�' SPU�i� L � Rkn a20S9 �. J _----- - - - - _- _ __ r^ , ( R SUEDRNN - ----- - - - - -- - -- / q 4 X RAIN ® 1.0 BUWNG . �, azo3.58 1 m. aaa2o2w gp -- -- - 2 0 ® ASSUMED BOTTOM OF FOOTING IS 4" SDR35 PVC o v Y+Y 80 ._ ELEVATI s,', t AND THE 82011 -� -- '- ------------------ - - - -'l -- ------- - - - - -- ------ ----- - - - - -- PETauNE/Fr CONTRACTOR IS TO VERIFY PR OR TO / � BELOW THE FIRST FLOOR PATIOS AT SUBD y; � - .�_ -- - +> BELOW CONSTRUCTION AND NOTIFY AEI AS CON NUE FREE _ F ----- �'__ -___ Inv =2 6.91 z SOON AS POSSIBLE IF HIGHER SO AS DRAINING GRAVEL- ` i1 . t , 5^` 1 'T -,. r .•• r- k„ •a _ ? ,wi! -? rv', +F.%,,..'" < TO NOT UNDERMINE THE BUILDING AROUND INLET o -_ - -- -- - - FOOTINGS. r o .� , � }' EXISTING -- _ _ _ - _______ -- - ___8180 \t\ 2. THE PROPOSED BOULDER �aj 12" CMP = _ \1 _ - -= -- -- ~__ -` - -- _ r -- -.�` \\ RETAINING WALL CONTINUES UNDER o/I I ®1.7% n to ° �r to THE EXISTING to ° . __ - -- - - STAIRS ° NG ACCESS RAMP AND THE ' J - AMP IS TO BE PROTECTED DURING �� I ° aTao - - -_ _ __ - -- \� i `.----- - - - - -- - - '-- - -- - - - _ NSTRUCTION. - J I z z Y Z A HEAT TAPE IS RECOMMENDED TO ``' 0 _ A - o ° v ° o GAZEBO � I -- - -~ - ' - - -- - °� INIMIZE FREEZING IN THE SHALLOW ---- - --___- J - - --`- a� °"�- 12" PIPE IN THE NORTH PLAZA O .4L..80 SEE --- - - - - -' - ;�„� ._._ . __._ -._ Pool '` , - ` `--- -- _.s'� - BUILDING RETAINING _ RAMP 4 THE CO�iTRAGTORI 1S T �/E..1FY WALLS - �. TNT fHE TEMPORARY AtJD,„ PLANTER g "• ECTIONS SHEET �� - - - - -- - PERMANENT CONSTRUCTI ON-= 1- ARAINAGE EASEM.... RE IN PACE ----- - - - - -- I i' DETA C• -03.0 PR�OR`TO SjARTING qNY NA r I Isis, 2259 11111 F'-IIVFAL V ROCK SCALE: 1 I = 10 coivsTR�CTION �'� 8 0.8 sHE� r _ .__._ ... k) W REMOVE /REPLACE • I AV ;/ * d; • �_ : 4,khk., CURB & GUTTER s m s Q M 0 N z a J LIGHT (PTYR, ELEC. - \. ;,., _6 -10' ROCK �d3 ( SPACES TOP LEVEL SPACES LOWER LEVEL ti_X 822 9 ` - 8226.1 \ Hca \ 8226.2 26v l SIGN RETAININ43 WALLS PLAN CONC. WALK' 0400161 `� /8227 .2 'OLEO � -' ��•�; %:\/ / - �- ...``�, � \ 26 Hd3 :,nom. GO A \` \ I IM III" s •• ®er 0, ®p avm @Tl ®8 ® f[ ®� Y.,L :q�. f.1H 6Y= ®I f. / 9JWCE':�vlei ® ® a4•r�r aru.�.e ..•....,.. ..,...raa :'@$ •, • • II.•R. zctr• rn_ �A�,�■■��■•y�t.1� =�■n�iq►e`'i!� /...•tea e. • •• 0e. - � - _ �� •, I I I I I I I I I I I I x CONC. 1 C WALL (i YP.) i i RET. WALL I I 1 I I I I I I I I I - -_ - -_ PARKING DECK OUTLINE 21020 SQ. FT. G SPACES TOP LEVEL G SPACES LOWER LEVEL Mill r!•ilYS!✓✓ �LIIL•l�wa�m n ■ . I L a -• -• . •., 2'x2' Inlet •• • Inv=8206.00 PROPOSED PROPOSED O •• • •- PVC 0 •• EDGE OFD PATIO I I I I I I I I I I i I I i I I I I I I 1 I I I PROPOSED I I I I I I 76 L.F. OF I I I I ( I STAIRS 12" SDR35 I I I I I I PVC ® 1.0% I I I I I I I I I I I I I I I I I I - - - -- ------------------ - - - - -- - ----------------------------- IRON FENCE (TYP) TEPS POOL 1 ES LOWER LEVEL STAIRS GAZEBO POOL RAMP BUILDING (n ----- - - - - -� - - -- 8209. X 8227.5 RETAINING WALLS SECTIONS PROPOSED GEOT SOILS ENGINEER TO DESIGN SPACING, TYPE AND LENGTH BASED ON SITE CONDITIONS. SEE SOILS REPORT \ 24" TO 48" BOULDERS TYPICAL PROPOSED BOULDERS 6' MAXIMUM WALL HEIGHT PROPOSED 18'1 _ PVC SUBDRAIN, DRAIN 0 NOTE; TO STORM OR DAYLIGHT / j j/ /�\j \j\ 1' KEY IN \ �\ UNDISTURBED\ SUITABLE TOP ROW OF BOULDERS /�� / /\�SUBGRADE ARE TO BE INTERLOCKING OR SET IN NOT VISIBLE NON- SHRINK GROUT TYPICAL MSE BOULDER WALL SECTION NOT TO SCALE 8220.00 2:1 r•rtV VJGV 2.00' 4" S BDRAIN 2:1 8210.00 8200.00 PROPOSED BOULDERS APPROX. 5' (D z 0 J m PROPOSED RE- GvADED 4" SUBDRAIN 2: PATIO PROPOSED/ - G OTEME PROPOSED 4" SUBDRAIN PROPOSED 12" DRAIN APP OX. 14' OF GEO EXTILE (TYP.) PROPOSED SUBDRAINS MAY BE MODIFIED /MINI IZED PER THE SOILS ENGINEER RECOMMENDATIONS. THE WREN - RETAINING WALL 2007 BOULDER & MSE WALL - SECTION A -A RETAINING WALL - GEOTEXTILE SECTION \ FIqB PAIN #4 REBAR ti \ \ :RQ�J< «;•;•;•;> 18 GRAVEL \ \ WALK \ EXISTING z WALL °_ J 5 m CURB AND z GUTTER N X W PROPOSED Q O BOULDERS PROPOSED 4" SUBDRAIN PROPOSED RE- GRADED F ol :' PATIO PROPOSED PROPOSEDOO ROPOS D 4" SUBDRAIN 12" DRAIN 6" DRAT PROPOSED 4" SUBDRAIN AT BACK OF GEOGRID SECTION THE WREN - RETAINING WALL 2007 BOULDER & MSE WALL - SECTION A -A J t`• : {i1�8205'�0', l � 16 \ 2 1 �O SPLIT RAIL FENCE (TYP) L h PLANTER -- - - - -- 81 0 f0 P VER SCALE: 1" = 10' W LK STAND PIPE I - o +oo o +40 RETAINING WALL - TYPICAL SECTION Construction Specifications 1. Fence posts shall be a minimum of 36" long driven 16" minimum into the ground. Wood posts shall be 11/2" x 11/2" square (minimum) cut, or 13/4" diameter (minimum) round and shall be of sound quality hardwood. Steel posts will be standard T or U section weighting not less than 1.00 pond per linear foot. 2. Geotextile shall be fastened securely to each fence post with wire ties or staples at top and midsection and shall meet the following requirements for Geotextile Class F: Tensile Strength 50 Ibs /in (min.) Test: MSMT 509 Tensile Modulus 20 Ibs /in (min.) Test: MSMT 509 Flow Rate 0.3 gal ft / minute (max.) Test: MSMT 322 Filtering Efficiency 75% (min.) Test: MSMT 322 3. Where ends of geotextile fabric come together, they shall be overlapped, folded and stapled to prevent sediment bypass. 4. Silt Fence shall be inspected after each rainfall event and maintained when bulges occur or when sediment accumulation reached 50% of the fabric height. 8220.00 HORIZONTAL AND VERTICAL SCALE: 1" =6' 8210.00 $200.00 2 "x2 "x3' WOOD STAKES e• e , 6 0 I � e 9« � a BALES 4" to 6 "' INTO GROUND N.T.S. B INLET PROTECTION 10 MAXIMUM CENTER TO 36" MINIMUM LENGTH FENCE POST, NOTES: CENTER DRIVEN A MINIMUM OF 16" INTO DITCH RECONSTRUCTION MAY IMPACT EXISTING SHALLOW UTILITIES AND MAY r , GROUND INCLUDE THE INSTALLATION OF SUBDRAINS, CULVERTS AND AREA INLETS. R I ' ALL DISTURBED AREAS WITHIN THE PROJECT TO HAVE A MINIMUM 6" OF �` f TOPSOIL PLACEMENT AND TO BE RE- SEEDED WITH LOW GROW, DITCH SEED PROPOSED z fill -16" MINIMUM HEIGHT OF MIX EXCEPT BEHIND CURB AND GUTTER WHERE SOD IS TO BE INSTALLED. Rim- 8209.4 .• Y GEOTEXTILE CLASS F 4 WIDE EXC OR EROSION CONTROL BLANK E KEYED INTO THE AT Inv = 8204.9 8" MINIMUM DEPTH IN TO TOP END OF DITCH CONSTRUCTION DISTURBANCE. GROUND EROSION CONTROL, HAY BALE DIKES, TO BE PLACED ALONG THE DITCH AT I AT MAXIMUM INTERVAL OF EVERY 200 FT. AND ALSO AT ANY INLETS. X FLOW FLOW 820 ' 5 12" CMP 36 " MINIMUM FENCE Inv= 206.91 POST LENGTH \_ PERSPECTIVE VIEW 2' GRAVEL FILTER CLOTH FENCE POST SECTION HOULD R 5' 0 2.5:1 ' 0 2.5 -.1 II I I EXISTING FLOW MINIMUM 20" ABOVE ROAD NG 5 6" TOPSOIL GROUND t• / / 12" CMP UNDISTURBED AND RE -VEG i CAD 1.7% GROUND I I EMBED GEOTEXTILE CLASS / EXI A MINIMUM OF 8" VERTICALLY /� \�� \� \ \ / / \ \ / / \ \ / / \ \'� \\ - / \ \� / ` GROUND I POSTS INTO THE GROUND MINIMUM P OF 16 INTO A \ \ \ / \ \ / \ \/\ O O O 0 THE GROUND 18" Cat MPAC TED / /i / / \ � /� ODO�O�O0 I I SECTION B 1 -1/2" SCREENED ROCK \ //\ 0 0 00000 / 24" ( SECTION A CROSS SECTION \\ 0 0 0 0 \\ STAPLE \ \/ O WRAP SCREENED ROCK AND PIPE -�/�� 0 0 O 0O 8 O STAPLE A W/ MIRAFI 140N FABRIC AND PLACE JOINING TWO ADJACENT SILT T(3�Jll� Cit' V 11- PIPE AT 2% SLOPE AND CONNECT TO ✓i / \/ K \�� \ / /.� //. 4" RIGID I i FENCE SECTIONS DESIGN R View PROPOSED AREA OR VALLEY INLETS RIGID SDR35 I i TOP VIEW STAFF APPftOV'AL 18" PVC PIPE i I N.T.S. i I I � _ _ _ - -_- =N. T. S. A SILT FENCE C TYPICAL PERFORATED SUBDRAIN SECTION CURB & GUTTER Un z m NM oF) I LID X z ° ¢ LL (�/ ¢ L.1- Us W ° LLJ WNn NOM NW ° o z a n LLJ ° w N B z � o V) N W W n 0 0 I � Q (0 r O O - z 0 0 0 N O u7 W Of o r O D w Y O Z Uj w 0:: i C0 a 0 0 0 SHEET C -04.0 2 415.0U 2 223.55+ '223.91 W ' Gr ade 4 s Existin • •: 221.2 • PROPO Rim=8219. •; . R e.mw�Y V- { { "• m�.m,.'. Y • .. • � �•. 61�iilff/i�ifiW��IL7�_\ ...... im,s/ail� I I I I I I I I I I I I x CONC. 1 C WALL (i YP.) i i RET. WALL I I 1 I I I I I I I I I - -_ - -_ PARKING DECK OUTLINE 21020 SQ. FT. G SPACES TOP LEVEL G SPACES LOWER LEVEL Mill r!•ilYS!✓✓ �LIIL•l�wa�m n ■ . I L a -• -• . •., 2'x2' Inlet •• • Inv=8206.00 PROPOSED PROPOSED O •• • •- PVC 0 •• EDGE OFD PATIO I I I I I I I I I I i I I i I I I I I I 1 I I I PROPOSED I I I I I I 76 L.F. OF I I I I ( I STAIRS 12" SDR35 I I I I I I PVC ® 1.0% I I I I I I I I I I I I I I I I I I - - - -- ------------------ - - - - -- - ----------------------------- IRON FENCE (TYP) TEPS POOL 1 ES LOWER LEVEL STAIRS GAZEBO POOL RAMP BUILDING (n ----- - - - - -� - - -- 8209. X 8227.5 RETAINING WALLS SECTIONS PROPOSED GEOT SOILS ENGINEER TO DESIGN SPACING, TYPE AND LENGTH BASED ON SITE CONDITIONS. SEE SOILS REPORT \ 24" TO 48" BOULDERS TYPICAL PROPOSED BOULDERS 6' MAXIMUM WALL HEIGHT PROPOSED 18'1 _ PVC SUBDRAIN, DRAIN 0 NOTE; TO STORM OR DAYLIGHT / j j/ /�\j \j\ 1' KEY IN \ �\ UNDISTURBED\ SUITABLE TOP ROW OF BOULDERS /�� / /\�SUBGRADE ARE TO BE INTERLOCKING OR SET IN NOT VISIBLE NON- SHRINK GROUT TYPICAL MSE BOULDER WALL SECTION NOT TO SCALE 8220.00 2:1 r•rtV VJGV 2.00' 4" S BDRAIN 2:1 8210.00 8200.00 PROPOSED BOULDERS APPROX. 5' (D z 0 J m PROPOSED RE- GvADED 4" SUBDRAIN 2: PATIO PROPOSED/ - G OTEME PROPOSED 4" SUBDRAIN PROPOSED 12" DRAIN APP OX. 14' OF GEO EXTILE (TYP.) PROPOSED SUBDRAINS MAY BE MODIFIED /MINI IZED PER THE SOILS ENGINEER RECOMMENDATIONS. THE WREN - RETAINING WALL 2007 BOULDER & MSE WALL - SECTION A -A RETAINING WALL - GEOTEXTILE SECTION \ FIqB PAIN #4 REBAR ti \ \ :RQ�J< «;•;•;•;> 18 GRAVEL \ \ WALK \ EXISTING z WALL °_ J 5 m CURB AND z GUTTER N X W PROPOSED Q O BOULDERS PROPOSED 4" SUBDRAIN PROPOSED RE- GRADED F ol :' PATIO PROPOSED PROPOSEDOO ROPOS D 4" SUBDRAIN 12" DRAIN 6" DRAT PROPOSED 4" SUBDRAIN AT BACK OF GEOGRID SECTION THE WREN - RETAINING WALL 2007 BOULDER & MSE WALL - SECTION A -A J t`• : {i1�8205'�0', l � 16 \ 2 1 �O SPLIT RAIL FENCE (TYP) L h PLANTER -- - - - -- 81 0 f0 P VER SCALE: 1" = 10' W LK STAND PIPE I - o +oo o +40 RETAINING WALL - TYPICAL SECTION Construction Specifications 1. Fence posts shall be a minimum of 36" long driven 16" minimum into the ground. Wood posts shall be 11/2" x 11/2" square (minimum) cut, or 13/4" diameter (minimum) round and shall be of sound quality hardwood. Steel posts will be standard T or U section weighting not less than 1.00 pond per linear foot. 2. Geotextile shall be fastened securely to each fence post with wire ties or staples at top and midsection and shall meet the following requirements for Geotextile Class F: Tensile Strength 50 Ibs /in (min.) Test: MSMT 509 Tensile Modulus 20 Ibs /in (min.) Test: MSMT 509 Flow Rate 0.3 gal ft / minute (max.) Test: MSMT 322 Filtering Efficiency 75% (min.) Test: MSMT 322 3. Where ends of geotextile fabric come together, they shall be overlapped, folded and stapled to prevent sediment bypass. 4. Silt Fence shall be inspected after each rainfall event and maintained when bulges occur or when sediment accumulation reached 50% of the fabric height. 8220.00 HORIZONTAL AND VERTICAL SCALE: 1" =6' 8210.00 $200.00 2 "x2 "x3' WOOD STAKES e• e , 6 0 I � e 9« � a BALES 4" to 6 "' INTO GROUND N.T.S. B INLET PROTECTION 10 MAXIMUM CENTER TO 36" MINIMUM LENGTH FENCE POST, NOTES: CENTER DRIVEN A MINIMUM OF 16" INTO DITCH RECONSTRUCTION MAY IMPACT EXISTING SHALLOW UTILITIES AND MAY r , GROUND INCLUDE THE INSTALLATION OF SUBDRAINS, CULVERTS AND AREA INLETS. R I ' ALL DISTURBED AREAS WITHIN THE PROJECT TO HAVE A MINIMUM 6" OF �` f TOPSOIL PLACEMENT AND TO BE RE- SEEDED WITH LOW GROW, DITCH SEED PROPOSED z fill -16" MINIMUM HEIGHT OF MIX EXCEPT BEHIND CURB AND GUTTER WHERE SOD IS TO BE INSTALLED. Rim- 8209.4 .• Y GEOTEXTILE CLASS F 4 WIDE EXC OR EROSION CONTROL BLANK E KEYED INTO THE AT Inv = 8204.9 8" MINIMUM DEPTH IN TO TOP END OF DITCH CONSTRUCTION DISTURBANCE. GROUND EROSION CONTROL, HAY BALE DIKES, TO BE PLACED ALONG THE DITCH AT I AT MAXIMUM INTERVAL OF EVERY 200 FT. AND ALSO AT ANY INLETS. X FLOW FLOW 820 ' 5 12" CMP 36 " MINIMUM FENCE Inv= 206.91 POST LENGTH \_ PERSPECTIVE VIEW 2' GRAVEL FILTER CLOTH FENCE POST SECTION HOULD R 5' 0 2.5:1 ' 0 2.5 -.1 II I I EXISTING FLOW MINIMUM 20" ABOVE ROAD NG 5 6" TOPSOIL GROUND t• / / 12" CMP UNDISTURBED AND RE -VEG i CAD 1.7% GROUND I I EMBED GEOTEXTILE CLASS / EXI A MINIMUM OF 8" VERTICALLY /� \�� \� \ \ / / \ \ / / \ \ / / \ \'� \\ - / \ \� / ` GROUND I POSTS INTO THE GROUND MINIMUM P OF 16 INTO A \ \ \ / \ \ / \ \/\ O O O 0 THE GROUND 18" Cat MPAC TED / /i / / \ � /� ODO�O�O0 I I SECTION B 1 -1/2" SCREENED ROCK \ //\ 0 0 00000 / 24" ( SECTION A CROSS SECTION \\ 0 0 0 0 \\ STAPLE \ \/ O WRAP SCREENED ROCK AND PIPE -�/�� 0 0 O 0O 8 O STAPLE A W/ MIRAFI 140N FABRIC AND PLACE JOINING TWO ADJACENT SILT T(3�Jll� Cit' V 11- PIPE AT 2% SLOPE AND CONNECT TO ✓i / \/ K \�� \ / /.� //. 4" RIGID I i FENCE SECTIONS DESIGN R View PROPOSED AREA OR VALLEY INLETS RIGID SDR35 I i TOP VIEW STAFF APPftOV'AL 18" PVC PIPE i I N.T.S. i I I � _ _ _ - -_- =N. T. S. A SILT FENCE C TYPICAL PERFORATED SUBDRAIN SECTION CURB & GUTTER Un z m NM oF) I LID X z ° ¢ LL (�/ ¢ L.1- Us W ° LLJ WNn NOM NW ° o z a n LLJ ° w N B z � o V) N W W n 0 0 I � Q (0 r O O - z 0 0 0 N O u7 W Of o r O D w Y O Z Uj w 0:: i C0 a 0 0 0 SHEET C -04.0 2 EDGE OFD PATIO I I I I I I I I I I i I I i I I I I I I 1 I I I PROPOSED I I I I I I 76 L.F. OF I I I I ( I STAIRS 12" SDR35 I I I I I I PVC ® 1.0% I I I I I I I I I I I I I I I I I I - - - -- ------------------ - - - - -- - ----------------------------- IRON FENCE (TYP) TEPS POOL 1 ES LOWER LEVEL STAIRS GAZEBO POOL RAMP BUILDING (n ----- - - - - -� - - -- 8209. X 8227.5 RETAINING WALLS SECTIONS PROPOSED GEOT SOILS ENGINEER TO DESIGN SPACING, TYPE AND LENGTH BASED ON SITE CONDITIONS. SEE SOILS REPORT \ 24" TO 48" BOULDERS TYPICAL PROPOSED BOULDERS 6' MAXIMUM WALL HEIGHT PROPOSED 18'1 _ PVC SUBDRAIN, DRAIN 0 NOTE; TO STORM OR DAYLIGHT / j j/ /�\j \j\ 1' KEY IN \ �\ UNDISTURBED\ SUITABLE TOP ROW OF BOULDERS /�� / /\�SUBGRADE ARE TO BE INTERLOCKING OR SET IN NOT VISIBLE NON- SHRINK GROUT TYPICAL MSE BOULDER WALL SECTION NOT TO SCALE 8220.00 2:1 r•rtV VJGV 2.00' 4" S BDRAIN 2:1 8210.00 8200.00 PROPOSED BOULDERS APPROX. 5' (D z 0 J m PROPOSED RE- GvADED 4" SUBDRAIN 2: PATIO PROPOSED/ - G OTEME PROPOSED 4" SUBDRAIN PROPOSED 12" DRAIN APP OX. 14' OF GEO EXTILE (TYP.) PROPOSED SUBDRAINS MAY BE MODIFIED /MINI IZED PER THE SOILS ENGINEER RECOMMENDATIONS. THE WREN - RETAINING WALL 2007 BOULDER & MSE WALL - SECTION A -A RETAINING WALL - GEOTEXTILE SECTION \ FIqB PAIN #4 REBAR ti \ \ :RQ�J< «;•;•;•;> 18 GRAVEL \ \ WALK \ EXISTING z WALL °_ J 5 m CURB AND z GUTTER N X W PROPOSED Q O BOULDERS PROPOSED 4" SUBDRAIN PROPOSED RE- GRADED F ol :' PATIO PROPOSED PROPOSEDOO ROPOS D 4" SUBDRAIN 12" DRAIN 6" DRAT PROPOSED 4" SUBDRAIN AT BACK OF GEOGRID SECTION THE WREN - RETAINING WALL 2007 BOULDER & MSE WALL - SECTION A -A J t`• : {i1�8205'�0', l � 16 \ 2 1 �O SPLIT RAIL FENCE (TYP) L h PLANTER -- - - - -- 81 0 f0 P VER SCALE: 1" = 10' W LK STAND PIPE I - o +oo o +40 RETAINING WALL - TYPICAL SECTION Construction Specifications 1. Fence posts shall be a minimum of 36" long driven 16" minimum into the ground. Wood posts shall be 11/2" x 11/2" square (minimum) cut, or 13/4" diameter (minimum) round and shall be of sound quality hardwood. Steel posts will be standard T or U section weighting not less than 1.00 pond per linear foot. 2. Geotextile shall be fastened securely to each fence post with wire ties or staples at top and midsection and shall meet the following requirements for Geotextile Class F: Tensile Strength 50 Ibs /in (min.) Test: MSMT 509 Tensile Modulus 20 Ibs /in (min.) Test: MSMT 509 Flow Rate 0.3 gal ft / minute (max.) Test: MSMT 322 Filtering Efficiency 75% (min.) Test: MSMT 322 3. Where ends of geotextile fabric come together, they shall be overlapped, folded and stapled to prevent sediment bypass. 4. Silt Fence shall be inspected after each rainfall event and maintained when bulges occur or when sediment accumulation reached 50% of the fabric height. 8220.00 HORIZONTAL AND VERTICAL SCALE: 1" =6' 8210.00 $200.00 2 "x2 "x3' WOOD STAKES e• e , 6 0 I � e 9« � a BALES 4" to 6 "' INTO GROUND N.T.S. B INLET PROTECTION 10 MAXIMUM CENTER TO 36" MINIMUM LENGTH FENCE POST, NOTES: CENTER DRIVEN A MINIMUM OF 16" INTO DITCH RECONSTRUCTION MAY IMPACT EXISTING SHALLOW UTILITIES AND MAY r , GROUND INCLUDE THE INSTALLATION OF SUBDRAINS, CULVERTS AND AREA INLETS. R I ' ALL DISTURBED AREAS WITHIN THE PROJECT TO HAVE A MINIMUM 6" OF �` f TOPSOIL PLACEMENT AND TO BE RE- SEEDED WITH LOW GROW, DITCH SEED PROPOSED z fill -16" MINIMUM HEIGHT OF MIX EXCEPT BEHIND CURB AND GUTTER WHERE SOD IS TO BE INSTALLED. Rim- 8209.4 .• Y GEOTEXTILE CLASS F 4 WIDE EXC OR EROSION CONTROL BLANK E KEYED INTO THE AT Inv = 8204.9 8" MINIMUM DEPTH IN TO TOP END OF DITCH CONSTRUCTION DISTURBANCE. GROUND EROSION CONTROL, HAY BALE DIKES, TO BE PLACED ALONG THE DITCH AT I AT MAXIMUM INTERVAL OF EVERY 200 FT. AND ALSO AT ANY INLETS. X FLOW FLOW 820 ' 5 12" CMP 36 " MINIMUM FENCE Inv= 206.91 POST LENGTH \_ PERSPECTIVE VIEW 2' GRAVEL FILTER CLOTH FENCE POST SECTION HOULD R 5' 0 2.5:1 ' 0 2.5 -.1 II I I EXISTING FLOW MINIMUM 20" ABOVE ROAD NG 5 6" TOPSOIL GROUND t• / / 12" CMP UNDISTURBED AND RE -VEG i CAD 1.7% GROUND I I EMBED GEOTEXTILE CLASS / EXI A MINIMUM OF 8" VERTICALLY /� \�� \� \ \ / / \ \ / / \ \ / / \ \'� \\ - / \ \� / ` GROUND I POSTS INTO THE GROUND MINIMUM P OF 16 INTO A \ \ \ / \ \ / \ \/\ O O O 0 THE GROUND 18" Cat MPAC TED / /i / / \ � /� ODO�O�O0 I I SECTION B 1 -1/2" SCREENED ROCK \ //\ 0 0 00000 / 24" ( SECTION A CROSS SECTION \\ 0 0 0 0 \\ STAPLE \ \/ O WRAP SCREENED ROCK AND PIPE -�/�� 0 0 O 0O 8 O STAPLE A W/ MIRAFI 140N FABRIC AND PLACE JOINING TWO ADJACENT SILT T(3�Jll� Cit' V 11- PIPE AT 2% SLOPE AND CONNECT TO ✓i / \/ K \�� \ / /.� //. 4" RIGID I i FENCE SECTIONS DESIGN R View PROPOSED AREA OR VALLEY INLETS RIGID SDR35 I i TOP VIEW STAFF APPftOV'AL 18" PVC PIPE i I N.T.S. i I I � _ _ _ - -_- =N. T. S. A SILT FENCE C TYPICAL PERFORATED SUBDRAIN SECTION CURB & GUTTER Un z m NM oF) I LID X z ° ¢ LL (�/ ¢ L.1- Us W ° LLJ WNn NOM NW ° o z a n LLJ ° w N B z � o V) N W W n 0 0 I � Q (0 r O O - z 0 0 0 N O u7 W Of o r O D w Y O Z Uj w 0:: i C0 a 0 0 0 SHEET C -04.0 2 EXISTING z WALL °_ J 5 m CURB AND z GUTTER N X W PROPOSED Q O BOULDERS PROPOSED 4" SUBDRAIN PROPOSED RE- GRADED F ol :' PATIO PROPOSED PROPOSEDOO ROPOS D 4" SUBDRAIN 12" DRAIN 6" DRAT PROPOSED 4" SUBDRAIN AT BACK OF GEOGRID SECTION THE WREN - RETAINING WALL 2007 BOULDER & MSE WALL - SECTION A -A J t`• : {i1�8205'�0', l � 16 \ 2 1 �O SPLIT RAIL FENCE (TYP) L h PLANTER -- - - - -- 81 0 f0 P VER SCALE: 1" = 10' W LK STAND PIPE I - o +oo o +40 RETAINING WALL - TYPICAL SECTION Construction Specifications 1. Fence posts shall be a minimum of 36" long driven 16" minimum into the ground. Wood posts shall be 11/2" x 11/2" square (minimum) cut, or 13/4" diameter (minimum) round and shall be of sound quality hardwood. Steel posts will be standard T or U section weighting not less than 1.00 pond per linear foot. 2. Geotextile shall be fastened securely to each fence post with wire ties or staples at top and midsection and shall meet the following requirements for Geotextile Class F: Tensile Strength 50 Ibs /in (min.) Test: MSMT 509 Tensile Modulus 20 Ibs /in (min.) Test: MSMT 509 Flow Rate 0.3 gal ft / minute (max.) Test: MSMT 322 Filtering Efficiency 75% (min.) Test: MSMT 322 3. Where ends of geotextile fabric come together, they shall be overlapped, folded and stapled to prevent sediment bypass. 4. Silt Fence shall be inspected after each rainfall event and maintained when bulges occur or when sediment accumulation reached 50% of the fabric height. 8220.00 HORIZONTAL AND VERTICAL SCALE: 1" =6' 8210.00 $200.00 2 "x2 "x3' WOOD STAKES e• e , 6 0 I � e 9« � a BALES 4" to 6 "' INTO GROUND N.T.S. B INLET PROTECTION 10 MAXIMUM CENTER TO 36" MINIMUM LENGTH FENCE POST, NOTES: CENTER DRIVEN A MINIMUM OF 16" INTO DITCH RECONSTRUCTION MAY IMPACT EXISTING SHALLOW UTILITIES AND MAY r , GROUND INCLUDE THE INSTALLATION OF SUBDRAINS, CULVERTS AND AREA INLETS. R I ' ALL DISTURBED AREAS WITHIN THE PROJECT TO HAVE A MINIMUM 6" OF �` f TOPSOIL PLACEMENT AND TO BE RE- SEEDED WITH LOW GROW, DITCH SEED PROPOSED z fill -16" MINIMUM HEIGHT OF MIX EXCEPT BEHIND CURB AND GUTTER WHERE SOD IS TO BE INSTALLED. Rim- 8209.4 .• Y GEOTEXTILE CLASS F 4 WIDE EXC OR EROSION CONTROL BLANK E KEYED INTO THE AT Inv = 8204.9 8" MINIMUM DEPTH IN TO TOP END OF DITCH CONSTRUCTION DISTURBANCE. GROUND EROSION CONTROL, HAY BALE DIKES, TO BE PLACED ALONG THE DITCH AT I AT MAXIMUM INTERVAL OF EVERY 200 FT. AND ALSO AT ANY INLETS. X FLOW FLOW 820 ' 5 12" CMP 36 " MINIMUM FENCE Inv= 206.91 POST LENGTH \_ PERSPECTIVE VIEW 2' GRAVEL FILTER CLOTH FENCE POST SECTION HOULD R 5' 0 2.5:1 ' 0 2.5 -.1 II I I EXISTING FLOW MINIMUM 20" ABOVE ROAD NG 5 6" TOPSOIL GROUND t• / / 12" CMP UNDISTURBED AND RE -VEG i CAD 1.7% GROUND I I EMBED GEOTEXTILE CLASS / EXI A MINIMUM OF 8" VERTICALLY /� \�� \� \ \ / / \ \ / / \ \ / / \ \'� \\ - / \ \� / ` GROUND I POSTS INTO THE GROUND MINIMUM P OF 16 INTO A \ \ \ / \ \ / \ \/\ O O O 0 THE GROUND 18" Cat MPAC TED / /i / / \ � /� ODO�O�O0 I I SECTION B 1 -1/2" SCREENED ROCK \ //\ 0 0 00000 / 24" ( SECTION A CROSS SECTION \\ 0 0 0 0 \\ STAPLE \ \/ O WRAP SCREENED ROCK AND PIPE -�/�� 0 0 O 0O 8 O STAPLE A W/ MIRAFI 140N FABRIC AND PLACE JOINING TWO ADJACENT SILT T(3�Jll� Cit' V 11- PIPE AT 2% SLOPE AND CONNECT TO ✓i / \/ K \�� \ / /.� //. 4" RIGID I i FENCE SECTIONS DESIGN R View PROPOSED AREA OR VALLEY INLETS RIGID SDR35 I i TOP VIEW STAFF APPftOV'AL 18" PVC PIPE i I N.T.S. i I I � _ _ _ - -_- =N. T. S. A SILT FENCE C TYPICAL PERFORATED SUBDRAIN SECTION CURB & GUTTER Un z m NM oF) I LID X z ° ¢ LL (�/ ¢ L.1- Us W ° LLJ WNn NOM NW ° o z a n LLJ ° w N B z � o V) N W W n 0 0 I � Q (0 r O O - z 0 0 0 N O u7 W Of o r O D w Y O Z Uj w 0:: i C0 a 0 0 0 SHEET C -04.0 2 J t`• : {i1�8205'�0', l � 16 \ 2 1 �O SPLIT RAIL FENCE (TYP) L h PLANTER -- - - - -- 81 0 f0 P VER SCALE: 1" = 10' W LK STAND PIPE I - o +oo o +40 RETAINING WALL - TYPICAL SECTION Construction Specifications 1. Fence posts shall be a minimum of 36" long driven 16" minimum into the ground. Wood posts shall be 11/2" x 11/2" square (minimum) cut, or 13/4" diameter (minimum) round and shall be of sound quality hardwood. Steel posts will be standard T or U section weighting not less than 1.00 pond per linear foot. 2. Geotextile shall be fastened securely to each fence post with wire ties or staples at top and midsection and shall meet the following requirements for Geotextile Class F: Tensile Strength 50 Ibs /in (min.) Test: MSMT 509 Tensile Modulus 20 Ibs /in (min.) Test: MSMT 509 Flow Rate 0.3 gal ft / minute (max.) Test: MSMT 322 Filtering Efficiency 75% (min.) Test: MSMT 322 3. Where ends of geotextile fabric come together, they shall be overlapped, folded and stapled to prevent sediment bypass. 4. Silt Fence shall be inspected after each rainfall event and maintained when bulges occur or when sediment accumulation reached 50% of the fabric height. 8220.00 HORIZONTAL AND VERTICAL SCALE: 1" =6' 8210.00 $200.00 2 "x2 "x3' WOOD STAKES e• e , 6 0 I � e 9« � a BALES 4" to 6 "' INTO GROUND N.T.S. B INLET PROTECTION 10 MAXIMUM CENTER TO 36" MINIMUM LENGTH FENCE POST, NOTES: CENTER DRIVEN A MINIMUM OF 16" INTO DITCH RECONSTRUCTION MAY IMPACT EXISTING SHALLOW UTILITIES AND MAY r , GROUND INCLUDE THE INSTALLATION OF SUBDRAINS, CULVERTS AND AREA INLETS. R I ' ALL DISTURBED AREAS WITHIN THE PROJECT TO HAVE A MINIMUM 6" OF �` f TOPSOIL PLACEMENT AND TO BE RE- SEEDED WITH LOW GROW, DITCH SEED PROPOSED z fill -16" MINIMUM HEIGHT OF MIX EXCEPT BEHIND CURB AND GUTTER WHERE SOD IS TO BE INSTALLED. Rim- 8209.4 .• Y GEOTEXTILE CLASS F 4 WIDE EXC OR EROSION CONTROL BLANK E KEYED INTO THE AT Inv = 8204.9 8" MINIMUM DEPTH IN TO TOP END OF DITCH CONSTRUCTION DISTURBANCE. GROUND EROSION CONTROL, HAY BALE DIKES, TO BE PLACED ALONG THE DITCH AT I AT MAXIMUM INTERVAL OF EVERY 200 FT. AND ALSO AT ANY INLETS. X FLOW FLOW 820 ' 5 12" CMP 36 " MINIMUM FENCE Inv= 206.91 POST LENGTH \_ PERSPECTIVE VIEW 2' GRAVEL FILTER CLOTH FENCE POST SECTION HOULD R 5' 0 2.5:1 ' 0 2.5 -.1 II I I EXISTING FLOW MINIMUM 20" ABOVE ROAD NG 5 6" TOPSOIL GROUND t• / / 12" CMP UNDISTURBED AND RE -VEG i CAD 1.7% GROUND I I EMBED GEOTEXTILE CLASS / EXI A MINIMUM OF 8" VERTICALLY /� \�� \� \ \ / / \ \ / / \ \ / / \ \'� \\ - / \ \� / ` GROUND I POSTS INTO THE GROUND MINIMUM P OF 16 INTO A \ \ \ / \ \ / \ \/\ O O O 0 THE GROUND 18" Cat MPAC TED / /i / / \ � /� ODO�O�O0 I I SECTION B 1 -1/2" SCREENED ROCK \ //\ 0 0 00000 / 24" ( SECTION A CROSS SECTION \\ 0 0 0 0 \\ STAPLE \ \/ O WRAP SCREENED ROCK AND PIPE -�/�� 0 0 O 0O 8 O STAPLE A W/ MIRAFI 140N FABRIC AND PLACE JOINING TWO ADJACENT SILT T(3�Jll� Cit' V 11- PIPE AT 2% SLOPE AND CONNECT TO ✓i / \/ K \�� \ / /.� //. 4" RIGID I i FENCE SECTIONS DESIGN R View PROPOSED AREA OR VALLEY INLETS RIGID SDR35 I i TOP VIEW STAFF APPftOV'AL 18" PVC PIPE i I N.T.S. i I I � _ _ _ - -_- =N. T. S. A SILT FENCE C TYPICAL PERFORATED SUBDRAIN SECTION CURB & GUTTER Un z m NM oF) I LID X z ° ¢ LL (�/ ¢ L.1- Us W ° LLJ WNn NOM NW ° o z a n LLJ ° w N B z � o V) N W W n 0 0 I � Q (0 r O O - z 0 0 0 N O u7 W Of o r O D w Y O Z Uj w 0:: i C0 a 0 0 0 SHEET C -04.0 2 N.T.S. B INLET PROTECTION 10 MAXIMUM CENTER TO 36" MINIMUM LENGTH FENCE POST, NOTES: CENTER DRIVEN A MINIMUM OF 16" INTO DITCH RECONSTRUCTION MAY IMPACT EXISTING SHALLOW UTILITIES AND MAY r , GROUND INCLUDE THE INSTALLATION OF SUBDRAINS, CULVERTS AND AREA INLETS. R I ' ALL DISTURBED AREAS WITHIN THE PROJECT TO HAVE A MINIMUM 6" OF �` f TOPSOIL PLACEMENT AND TO BE RE- SEEDED WITH LOW GROW, DITCH SEED PROPOSED z fill -16" MINIMUM HEIGHT OF MIX EXCEPT BEHIND CURB AND GUTTER WHERE SOD IS TO BE INSTALLED. Rim- 8209.4 .• Y GEOTEXTILE CLASS F 4 WIDE EXC OR EROSION CONTROL BLANK E KEYED INTO THE AT Inv = 8204.9 8" MINIMUM DEPTH IN TO TOP END OF DITCH CONSTRUCTION DISTURBANCE. GROUND EROSION CONTROL, HAY BALE DIKES, TO BE PLACED ALONG THE DITCH AT I AT MAXIMUM INTERVAL OF EVERY 200 FT. AND ALSO AT ANY INLETS. X FLOW FLOW 820 ' 5 12" CMP 36 " MINIMUM FENCE Inv= 206.91 POST LENGTH \_ PERSPECTIVE VIEW 2' GRAVEL FILTER CLOTH FENCE POST SECTION HOULD R 5' 0 2.5:1 ' 0 2.5 -.1 II I I EXISTING FLOW MINIMUM 20" ABOVE ROAD NG 5 6" TOPSOIL GROUND t• / / 12" CMP UNDISTURBED AND RE -VEG i CAD 1.7% GROUND I I EMBED GEOTEXTILE CLASS / EXI A MINIMUM OF 8" VERTICALLY /� \�� \� \ \ / / \ \ / / \ \ / / \ \'� \\ - / \ \� / ` GROUND I POSTS INTO THE GROUND MINIMUM P OF 16 INTO A \ \ \ / \ \ / \ \/\ O O O 0 THE GROUND 18" Cat MPAC TED / /i / / \ � /� ODO�O�O0 I I SECTION B 1 -1/2" SCREENED ROCK \ //\ 0 0 00000 / 24" ( SECTION A CROSS SECTION \\ 0 0 0 0 \\ STAPLE \ \/ O WRAP SCREENED ROCK AND PIPE -�/�� 0 0 O 0O 8 O STAPLE A W/ MIRAFI 140N FABRIC AND PLACE JOINING TWO ADJACENT SILT T(3�Jll� Cit' V 11- PIPE AT 2% SLOPE AND CONNECT TO ✓i / \/ K \�� \ / /.� //. 4" RIGID I i FENCE SECTIONS DESIGN R View PROPOSED AREA OR VALLEY INLETS RIGID SDR35 I i TOP VIEW STAFF APPftOV'AL 18" PVC PIPE i I N.T.S. i I I � _ _ _ - -_- =N. T. S. A SILT FENCE C TYPICAL PERFORATED SUBDRAIN SECTION CURB & GUTTER Un z m NM oF) I LID X z ° ¢ LL (�/ ¢ L.1- Us W ° LLJ WNn NOM NW ° o z a n LLJ ° w N B z � o V) N W W n 0 0 I � Q (0 r O O - z 0 0 0 N O u7 W Of o r O D w Y O Z Uj w 0:: i C0 a 0 0 0 SHEET C -04.0 2 SHEET C -04.0 2 .o Iu Ln s r ° o Z Z J S 1-1/2 2 -0'• 4- 1/2" a. 3 a : a . TYPE II- CATCH 2• -0" � 1, 4 d d; 3 a a A Q a TYPE II- SPILL NOTES: 1. BACKFILL, SEE DETAIL OF CUT /FILL SLOPE 2. SLOPE AT 1" PER FOOT 3. 1 -1/2" RADIUS TYPICAL 4. SLOPE TO MATCH ADJACENT PAVEMENT 5. PAVEMENT, SEE TYPICAL PAVEMENT SECTION 6. PROVIDE CONTRACTION JOINTS 12' O.C. MAXIMUM 7. PROVIDE EXPANSION JOINTS 100 O.C. MAXIMUM B. SLOPE AT 1/2" PER FOOT PROVIDE A MIN. 6" COMPACTED BASE COURSE UNDER ALL CURB AND GUTTER / \ #3 REBAR AT 15" O.C. 6" CONCRETE BOTH WAYS OR WELDED WIRE FABRIC BRIC AT AT 6" COMPACTED BASE COURSE CENTER OF CONCRETE NOTE: SLOPE PAN AT 1 -1/2" PER FOOT. N.T.S. B 24 CONCRETE PAN (TYPICAL) N.T.S. A 6" VERTICAL CURB AND GUTTER -CATCH AND SPILL ( DIRT FOR LANDSCAPING FINAL PAVEMENT DESIGN WILL BE PERFORMED BY HP GEOTECH SOILS ENGINEERS DURING CONSTRUCTION AND SUBMITTED FOR ON SITE CONSTRUCTION. N.T.S. F1 ASPHALT DRIVEWAY TYPICAL SECTION FRAME & 'GRATE (D&L 1 -3517) WE 530# UFnNG••• ^' ^'"' (2)PER LIFT INSI IN2T SEE JOINT O N TV iV LEFT SIDE VIEW SECTION A -A CATCH BASIN WE 33.740# 2'x3' CATCH BASIN RISER ­­ Plans 12" CL 1 � I WEIGHT 2" 1C� i See 1/2" 1 1/2" See Plans 1.860# 3' 1 CB233R 2,790# 9. All storm drain and culvert outfalls to have End Sections or Endwalls } EXTENSIONS 1n 2' -0" / \ #3 REBAR AT 15" O.C. 6" CONCRETE BOTH WAYS OR WELDED WIRE FABRIC BRIC AT AT 6" COMPACTED BASE COURSE CENTER OF CONCRETE NOTE: SLOPE PAN AT 1 -1/2" PER FOOT. N.T.S. B 24 CONCRETE PAN (TYPICAL) N.T.S. A 6" VERTICAL CURB AND GUTTER -CATCH AND SPILL ( DIRT FOR LANDSCAPING FINAL PAVEMENT DESIGN WILL BE PERFORMED BY HP GEOTECH SOILS ENGINEERS DURING CONSTRUCTION AND SUBMITTED FOR ON SITE CONSTRUCTION. N.T.S. F1 ASPHALT DRIVEWAY TYPICAL SECTION FRAME & 'GRATE (D&L 1 -3517) WE 530# UFnNG••• ^' ^'"' (2)PER LIFT INSI IN2T SEE JOINT O N TV iV LEFT SIDE VIEW SECTION A -A CATCH BASIN WE 33.740# 2'x3' CATCH BASIN RISER HEIGHT I CODE I WEIGHT i' C8231R 930# 2' C8232R 1.860# 3' 1 CB233R 2,790# Scale: i' - 2' -0" NOTES: PROVIDE 18" SUMP 1. CATCH BASINS ARE DESIGNED TO MEET ASTM C858 WITH AASHTO HS -20 LOADING. 2. OPENINGS MAY BE LOCATED AS REQUIRED. 3. CHECK HARDWARE SECTION FOR OPTIONAL ACCESSORIES. PIPE SUBGRADE. MATERIAL IF \1/4 O.D., CULVERT BEDDING DETAIL 6 MIN NOTE TOWN OF VAIN (TOV) TRENCH BACKFILL SPECIFICATIONS DO NOT ALLOW MATERIAL LARGER THAN 6 WITHIN THE ENTIRE BACKFILL ZONE IN RIGHTS -OF -WAY. .\ / /���' TRENCH BACKFILL SEE SPECIFICATIONS FOR PACTION REQUIREMENTS B EDDI N G E SEE ABOVE JZATION /\ //M y I• RED TRENCH ZONES 2 I I VARIES (SEE PLANS) VARIES (SEE PLANS) 2 .. URB AN GUTTERI 22 "x22" _ 27 "x27" 0 FRAME & GRATE PER PLAN NON- SHRINK GROUT 9. All storm drain and culvert outfalls to have End Sections or Endwalls } EXTENSIONS 1n 2' -0" AS REQUIRED W Of ` ' INSIDE n necessary. Provide AASHTO HS -20 truck load rated top slab to • a, accommodate grate and frame for oversized boxes, 4 ° A 11. Pipe lengths indicated are horizontal lengths measured along the D &L 1 -9226 OR EQUIVALENT N.T.S. N.T.S. N.T.S. PROVIDE 18" SUMP H 2' x 3' CURB INLET DETAIL I CULVERT BEDDING DETAIL L 2' X 2' AREA INLET AND GRATE N x.38' AJI- DESIGN REVI l\ C) EAP PPHOVAI_ ., SHEET a� C -05.0 '5 t 4 e" 2.5 VARIES (SEE PLANS) VARIES (SEE PLANS) 2.5' URB AN GUTTERI _ URB AN GUTTER AL o o _iA . 2 3/4"r ..I i I JOINT DETAIL 6• TvP. 3 -o 4 -0 PLAN VIEW PROPOSED OUND (SEE PLANS 3/4' OR 1 -1/2" WASHED ROCK � 1WTH LESS THAN 2% PASSING A / #200 SEIVE OR AS OTHERWISE %\ SPECIFIED BY THE SOILS ENG. WRAP WASHED ROCK AND PIPE W/ MIRAFl 14ON FABRIC AND PLACE PIPE AT 1.0% MIN. SLOPE AND CONNECT TO PROPOSED AREA OR CURB INLETS OR PER PLANS TO A SOLID PIPE 18" 18 4' RIGID SDR35 PERFORATED PVC PIPE (SEE PLANS) DRAIN AREA = 62.7 SO. INCH GRATE HAS H -20 (HEAVY TRAFFIC) INI INF DRAIN WITH RISFR AND TFF INLINE DRAIN AT BEGINNING OF STORM SEWER DOT RATING QUALITY: MATERIAL SHALL CONFORM TO ASTM A48 - CLASS 30B PAINT: CASTINGS ARE FURNISHED WITH A BLACK PAINT N to LFOR ATE COVER ACCESS 1 , )Z� r 12" CAST IRON GRATE INS N�T.S. D i NYLOPLAST ELEVATION IN LANDSCAPE AREA TYPICAL INLET INSTALLATION m r I a 1 = -I 12" INLINE DRAIN 12" CAST IRON H -20 RATED GRATE i � I �tL__ J 12" INLINE DRAIN ADAPTORS AVAILABLE 4" THRU 12" VARIOUS TYPE OF OUTLETS WITH WATERTIGHT ADAPTORS FOR: - CORRUGATED POLYETHYLENE SDR -35 SEWER CORRUGATED PVC ULTRA -RIB PVC r IRON GRATE ADAPTORS AVAILABLE 4" THRU 8" VARIOUS TYPE OF OUTLETS WITH WATERTIGHT ADAPTORS 4 " -8" FOR: CORRUGATED POLYETHYLENE 10" INLINE DRAIN SDR -35 SEWER CORRUGATED PVC ULTRA -RIB PVC 8" < I J Q w K CASTIRON GRATE ADAPTORS AVAILABLE 4" THRU 6" 0 4 " -6" u y VARIOUS TYPE OF OUTLETS WITH WATERTIGHT ADAPTORS Q 8" INLINE DRAIN FOR: CORRUGATED POLYETHYLENE SDR -35 SEWER CORRUGATED PVC O ULTRA -RIB PVC I '' E NYLOPLAST INLINE DRAIN DETAIL 0 W O Q � �� -�0Z CAST IRON H -20 RATED GRATE SDR -35 SEWER SOLID RIGID PVC WITH WATERTIGHT ADAPTERS NYLOPLAST INLINE DRAIN PROPOSED GROUND (SEE PLANS) EXISTINO ., GROUND 3/4" OR 1 -1/2" WASHED ROCK O ° O WITH LESS THAN 2% PASSING A i / 187 #200 SEIVE OR AS OTHERWISE /\ O 0 12" RIGID SDR35 SPECIFIED BY THE SOILS ENG. � 0Op 0 PVC PIPE. (SEE PLANS) WRAP WASHED ROCK AND PIPE W/ MIRAFI MN FABRIC AND PLACE '24» PIPE AT 1.0% MIN. SLOPE AND CONNECT TO PROPOSED AREA OR CURB INLETS OR PER PLANS TO A SOLID PIPE N.T.S. J1 SECTION B -B SUBDRAIN P MOUND 'ING 50 1 SEE PIPE MANUFACTURER'S SPECIFICATIONS FOR BEDDING REQUIREMENTS CLASS 6 BASE 1.2 X CULVERT OUTSIDE DIA. (MIN.) �`- TRENCH BACKFILL PIPE SUBGRADE 3/4 OR 1 -1 /2 WASHED ROCK O ° p °p \��� WITH LESS THAN 2% PASSING A X0 �/ 78' #200 SEIVE OR AS OTHERWISE O 0 / 12' RIGID SDR35 SPECIFIED BY THE SOILS ENG. 0 0 0 \ PVC PIPE. (SEE PLANS) WRAP WASHED ROCK AND PIPE � \/ � 4' RIGID SDR35 W/ MIRAFl 14ON FABRIC AND PLACE PIPE AT 1.0% MIN. SLOPE AND CONNECT PERFORATED PVC PIPE. TO PROPOSED AREA OR CURB INLETS OR (SEE PLANS) PER PLANS TO A SOLID PIPE N.T.S. K I SECTION C -C SUBDRAIN D &L STANDARD 2 CATCH B 1 -9226 OR EQUIVALENT SQUARE INLET FRAME & GRATE DRAINAGE NO I CO 1 10 1. All storm drains and culverts shall be constructed in accordance with U Town of Vail standards and specifications. U 2. Types of structures refer to the Colorado Department of Transportation , n M & S Standards, CDOT Specifications, or are included In the details. 3. Alpine Engineering, Inc., assumes no responsibility for utility locations. z It is the Contractor's responsibility to field verify the location of all �- utilities prior to commencement of any construction. (n 4. All drain pipes shall be installed with the required bedding. t/ 1 5. Elevations shown are at pipe invert unless otherwise shown. Q 6. All standard storm drain structures are subject to modification by the W O by the Engineer to accommodate existing field conditions W U 7. Where any part of the storm drain system is located in a fill section, T C. provide fill material compacted to 95% AASHTO T99 density from the original undisturbed ground up to structure bottom slabs and pipe bedding U r ' z a�rn Z Hn� ZX LL U W ° W VIC z__ ca U o w 0 V ° o Z a r 3 Q ' W ° w SUITABLE ON -SITE STRUCTURAL FILL T ^uv 8. Contractor to provide Culvert Outlet Protection (see detail) at storm drain and culvert outfalls unless otherwise noted. _ < 0 9. All storm drain and culvert outfalls to have End Sections or Endwalls } unless they are to be extended in the future. 10. Inlet boxes to be oversized to accommodate pipe size where necessary. Provide AASHTO HS -20 truck load rated top slab to accommodate grate and frame for oversized boxes, 11. Pipe lengths indicated are horizontal lengths measured along the centerline of pipe from inside face of box to inside face of box. a 12. Curb and Gutters shall be installed in such a manner as to insure n E positive drainage in all areas, as shown. o (n 5: w m X Tr o t� O UJ ON a t 0 0 O Z - O 0 O N O LO N 0 0 d' to 1Y K 0 M O O U-1 Y O c Z U Z w w K S 00 Q 1. All storm drains and culverts shall be constructed in accordance with U Town of Vail standards and specifications. U 2. Types of structures refer to the Colorado Department of Transportation , n M & S Standards, CDOT Specifications, or are included In the details. 3. Alpine Engineering, Inc., assumes no responsibility for utility locations. z It is the Contractor's responsibility to field verify the location of all �- utilities prior to commencement of any construction. (n 4. All drain pipes shall be installed with the required bedding. t/ 1 5. Elevations shown are at pipe invert unless otherwise shown. Q 6. All standard storm drain structures are subject to modification by the W O by the Engineer to accommodate existing field conditions W U 7. Where any part of the storm drain system is located in a fill section, T C. provide fill material compacted to 95% AASHTO T99 density from the original undisturbed ground up to structure bottom slabs and pipe bedding U r ' z a�rn Z Hn� ZX LL U W ° W VIC z__ ca U o w 0 V ° o Z a r 3 Q ' W ° w SUITABLE ON -SITE STRUCTURAL FILL T ^uv < < 0 1. All storm drains and culverts shall be constructed in accordance with U Town of Vail standards and specifications. U 2. Types of structures refer to the Colorado Department of Transportation , n M & S Standards, CDOT Specifications, or are included In the details. 3. Alpine Engineering, Inc., assumes no responsibility for utility locations. z It is the Contractor's responsibility to field verify the location of all �- utilities prior to commencement of any construction. (n 4. All drain pipes shall be installed with the required bedding. t/ 1 5. Elevations shown are at pipe invert unless otherwise shown. Q 6. All standard storm drain structures are subject to modification by the W O by the Engineer to accommodate existing field conditions W U 7. Where any part of the storm drain system is located in a fill section, T C. provide fill material compacted to 95% AASHTO T99 density from the original undisturbed ground up to structure bottom slabs and pipe bedding U r ' z a�rn Z Hn� ZX LL U W ° W VIC z__ ca U o w 0 V ° o Z a r 3 Q ' W ° w SUITABLE ON -SITE STRUCTURAL FILL T ^uv N 1/4 CRN. SEC. 8 f N T ND 3 1/4" BRASS CAP ON 8223.7 / I� S, ALUM. PIPE. U.S. CADASTRAL BLM $223.8x'` WALK 8224 CURB CUT `SOV TN FJ� AG ` c' �Z 198 . 8 e ROgp ) ' 7 �GN \ \ r ^^,8224.3 _ Y \^ 1 8224. CURB & CUTTER ( O • f{! V APPROX.. 450' +/ TO G WdW 1 \ r T \• 8224.8 R RleS1 .^`tD INTERSECTION GORE CREEK a FIRE HYD r DRIVE. �\.�• EIEC. MH "'^;). G J j 6225.2 fe j ••` -. ,GUARD POST 1 T t J 25. T r ` ^ 822 TRAM _.....3 0 t ��1 ^. �T,� �'Tw ^' ^" -a N S.7T' a2z Br 6223. [ G �`r^„ 8275.3 FND PIN & RED PLASTIC CAP +, 1> LS 24 ✓� ( I x e 2$. "51' UCHT f 4 r ^'^ CURB CUT N $ 21 x 422 �O 3g } ti G r x azzss A / S '3 22 !ma X 03• �. ;i e � >F r.`-, �.I � ....�. ?A 6-10' ROCK 1 4 8228:1 Cf p r .. 8222.6 --J�� . P ^ 8228�1K^ CONC CURB & GUTTER / 2s `^ } - 2 -5' ROC14(TYP x. ,1 f 28 ENCLOSURE ff 1 ^ F'. i �32 .3Ic TAIRS X 8228,5 x I ir�. f,-. %j13 - SICN { ` A 3 2 1.4 8227.3 } 7 Fes _ + � M1 y Y2 k - 28 x /, ;ii? , •1 #IS a4' ONE \ 1 8227.2 ` PED O `N �' x I8 ).7 19.2 $222.4 •82229 T 4^ 8227.5 TOP WAU , C m t TOP WALL t 82211 WOOD x I • TOP WALL. I �� C S1CN 0 20` 40' gp' FENGE,. I I A X 8279.2 i 9.0' . .tic l.."w. '. ' 6219.0 x x K I ( 8211 9.6 N u RpGE PLOWS 17 PARKING SPACES TOP LEVEL °' "' ,;. END PLAIN #4 REBAR 17 PARKING SPACES LOWER LEVEL ezl9sx F - m 8219.0 x f "' 8220.9 SNOW STORAGE v 8219.2 8219.5 x I 21.0 X GUAROPOST(T1P.) O r X22 i BL 8221.2 c J ' I 822 22.8 6223.1 8223.1 BLOCK PL LAN1 R gyps, t r+M gy20 TE ; 81.3' ' z. 92' 83= 82189 v ___ 8210.4 821A V" .•:1 l CENTERLINE ia` Y CROSS x I I ,,{ OVERHEAD P BOL HOLE ! ( > R LAN -"RAMP t' 11:1 821}:1 BL�RE7� PIGH7 -OF - CON RE T WALL WAY EASEMENT I m g 43, 3X� q V11�13 GRAVEL (8245. Pt 212717$ °`� c s �� t 1 WALK 0" NC. WALL (TYP.J� - STAIRS 1 4 { € r' ,> "'•� a • �A , �� '- y � a 80.4 820A2 3JS , DRAIN (TYP) lit I �RTf01 � 1 1 1 PERIMETER POOL DECK \ PARKING DECK OUTLINE 21020 SO, FT. i /14 e20214.1 .t 17 PARKING SPACES TOP LEVEL x x 1 4 0' " Ir Z 8214.8 EDGE OF SHOVELED ?� i8 PARKING SPACES LONER LEVEL AREA Y i 3.7 L SPLIT RAIL § ' ;:l �FENCE (TYP) APOLLO PARK I _ BTAR9 r i 5.91 ffF. A PART OF TRACT "D" w \ 913 8315 VAIL VILLAGE FIFTH FILING � I S.6 31.,' I a RECORDED IN B274, P697 rn e2fa1 8x10/ OPEN TO SPA DECK E �?" SEPTEMBER S, 1978 N I LowER LevEL wP ME 821f. 7x STEPS��� IRON :r ' (TYP ' ST ace 20.0• - z ( POOL I i x8209.3 UNPLATTED � CE \ "' POOL. DECK I t In x E209.6 FORD PARK ( POOL DECK ABOVE. PARKING ON FLOOR BELOW I THE WREN 14 PARKING SPACES LOWER LEVEL Q I ( A CONDOMINIUM PROJECT ,,,,,; SURVEYOR'S CERTIFICATE f I 8209. AS RECORDED IN 6244, P32. To: Wren Board Association 9 82 NO. 140183, J 9, 1976 0 t RECEPTION p I n x 8209, 8210.1 4.a 11? POOL DECK IT MJ �y STUBS 1.377 ACRES This is to certify that. this map or plot and the survey on which it ( 41: { is based were mode in aacordoncewith "Minimum Stondord Detail Requirements nT a GAZ€eo for ALTA /ACSM Land Title Surveys;' jointly established and adopted by ALTA, � ' � ' rr�� 5 r t � {TOP ELEVATOR SHAFT ELEV, i 8210 ACSM dnd NSPS m 1993, and includes Items 3, 4, 5; 6, 7 {a }, 7(1 ), 8, 9, tO. 71(0), x �� t o Y'' 9244.9 - oD and 11(b) of Tabie A thereat. 8210.0 RAMP - 'p a PLAN Pursuant to the Accuracy Standards as adopted by ALTA, NSPS, and ACSM \- - PLANTERS 152 8209,9 tot /�1 4Q and in effect on the dote of this certification, the undersigned further certifies +�v +' RAMP 8210.7 m 82os -,- -� that proper field- procedures, instrumentation and adequate survey personnel 1 w 22.7" .. ro gno6 x / 82192 P R were employed in order to achieve results comparable to those outlined in the / ST r` --{- I, 8219.2 FL ELEV. WALK i "Minimum Angle: Distance. and Closure Requirements for Survey Measurements \� 1 82Q;.5 f0.o' 77.3' /� / STAND PIP 6' " �\ Which' Control Land Boundaries for Land Title Surveys." °' cns 9294.9 / /x 921x.9 ASPHAL * Y # G ELEC, ' SERVICE FLAT ROOF EL€V. / FIRST FL ELEV. O `WALK iRANSI 8227.8 x(8211.2 w x b atare o-1 r \ 8236.3 THIRD FL ELEV. PLANTER t V GAS FOURTH Fl. ELEV k 8211.5 METER 4 STORY PREFABRICATED CONCRETE STRUCTURE x \ Michael T a A� i PERIMETER BUILDING OUTLINE 17,800 SO. FT. Coloradq ,td B^ sEwER LNE t 8211.3 w x Dote:- I1� SEWER x MH 0 X ROOF PEAK (TYP) x 8211.0 ! I 8253.4 w r7w" Frxase.:aa1"' 81p9 09 8211.2 1 x PHON PE ! I x I 109 x r 164.9' 9.G' 8210.5 8210.6 8210.5 x{ Y h t X �. x 8210 SPLIT RAIL ,{' X K , FENCE k -'` CABION ROCK 8200 N / 75 -`�-- - - ,.,,, PEQESiH[AN - GRAVEL _ �+. ^WALK -,,._ NN 89 77 �` PA7HWAYEASEMENT (6546. P) 1/22/91) W 832 /a �50' STREAM SETBACK LIGHT J (TYP) 38 90:" :38 N 73'30'00` F 9.15' - - --_.._ .. . I -" w -