HomeMy WebLinkAboutPEC120041 applicant's presentation to PEC_111212Marriott Residence Inn
Town of Vail
Planning and Environmental Commission
November 12, 2012
Introduction
•The Harp Group
•O’Bryan Partnership
•Timberline Lodge LLC
•Mauriello Planning Group
Application
•Major Exterior Alteration in the Public
Accommodation - 2 Zone District
Roost Location
Existing Development -
The Roost
•72 accommodation
units
•1 dwelling unit
Previous Approval -
Timberline Lodge
•101 limited service lodge units
•28 dwelling units
•3 employee housing units
•169 parking spaces
Timberline Lodge
•Timberline Lodge was affected by the
recession.
•Town of Vail approved an extension
vesting the prior approval to June 2014
New Proposal:
Marriott Residence Inn
•Marriott Residence Inn will comply
with the current Town of Vail
regulations:
•employee housing requirements
•payment of the construction use tax
•newly adopted Building Codes
Preservation of
Existing Approval
•The Harp Group under contract to purchase.
•The owner has significant investment in the
current vested entitlements for the property
which include a significant number of
dwelling units.
•Both approvals (current and proposed) will
stand on their own.
•Staff has structured the approval to allow
this.
New Proposal:
Marriott Residence Inn
•152 limited service lodge units (+51)
•2 employee housing units
•165 parking spaces
What are the Changes?
•On the exterior - nothing really changes
•Elimination of dwelling units - these were converted
to limited service lodge units
•Changes to employee housing units based on code
requirements
•Minor changes to the facade and common areas
within the building
•Relocation of the trash facility underground
(condition of previous approval)
•Elimination of west side setback encroachment
Proposed Program
•72 One-bedroom units
•73 Studio units
•7 Two-bedroom units
•1 two-bedroom employee housing unit, of 788 sq. ft., housing
2.25 employees
•1 dorm-syle employee housing unit of 1,000 sq. ft., housing 4
employees
•20,521 sq. ft. of lobby, lounge, and hotel service
•165 parking spaces, with 158 spaces in the structure and
additional 7 surface spaces
•A pool, hot tub, and fitness area
Proposed Aerial
Site Plan
South Elevation
North Elevation
East and West Elevations
Zoning Analysis
Standard Allowed/Required 2006
Parking Analysis
Use
Employee Housing
Analysis
Use Calculation Total
Employee Housing
Analysis
Unit
Employee Housing
Analysis
•56% of the employees will be housed
on site
•Exceeds 50% requirement
•Remaining 44% (4.95 employees) will
be housed in off-site units
Employee Housing
Analysis
•Town’s employee generation rates would
suggest this project would generate 107
full time equivalent employees
•0.7 employees per unit
•Operator has indicated that staffing will
be 38 full time equivalent employees at
high season
•0.25 employees per unit
Survey of Similar Properties
Hotel Address /
Location
Number of
Units
Number of
Employees
(range, if varied)
Employees /
Room On-Site Amenities
Inn & Suites at
Riverwalk Edwards, CO 73 19 0.26 pool, fitness room, complimentary
breakfast provided by outside restaurant
Lifthouse Lodge Vail, CO 43 7.5 0.17 Condo building so not a great comparison
though consist with other properties
surveyed
Holiday Inn Vail, CO 115 30 0.26 Lobby with breakfast, shuttle, pool
Roost Lodge Vail, CO 72 18 0.25
lobby with coffee and light breakfast,
shuttle
Holiday Inn Steamboat
Springs, CO 117 25 0.21 Shuttle, 2 pools, two meeting rooms
withtotla capacity of 80 people (50/30)
Comfort Suites Dillion 104 8.5 0.08
Breakfast, pool, no shuttle (on free route),
60 person meeting room
Hotel Frisco Frisco 18 3 0.17 Hot tub
Holiday Inn Frisco 216 26 0.12 shuttle, restaurant onsite not included in
count, large ballroom and board room
facilities, pool and fitness
The Inn at Aspen Aspen/
Buttermilk 122 22 0.18 Four additional FTE for restaurant, free
breakfast, shuttle service, pool,
kichenettes
AVERAGE:0.19
Employee Housing
Analysis
•Applicant will request a reduction in
the employee housing generation rate
for this type of hotel
•Provision in the code allows staff to
make the decision
•Staff prefers we seek a code
amendment to codify the reduced rate
Project Benefits
•Increased revenues with the
conversion of condos to hotel
rooms
•Increased exposure and
revenues due to marketing by
Marriott
•Improved average daily rate and
access to broad market of guests
•New hotel will meet the
GreenSeal Standard
•Improved image of Vail along the
I-70 corridor
•Improved access and circulation
with the addition of right and
left turn lanes
•10 ft. wide bike and pedestrian
lane in front of this property
and the adjoining two properties
to the west
•Provision of a new bus stop
enclosure
•Provision of public art
•Provision of employee housing
•Enhanced neighborhood access
with pedestrian path through
the property
•Excess underground parking
Criteria for Review
•The proposed exterior alteration is in
compliance with the purposes of the
Public Accommodation-2 zone district.
•The proposal does not otherwise have a
significant negative effect on the
character of the neighborhood
•The proposal substantially complies with
other applicable elements of the Vail
comprehensive plan.
Neighborhood Character
Neighborhood Character:
The Roost
Criteria for Review
•Complies with the Purpose of the PA-2
Zone District
•Improves the character of the
neighborhood
•Complies with applicable sections of
the Vail Comprehensive plan
Traffic Fee:
Previous Condition
•The developer shall be assessed a traffic
impact fee of $6500 per net increase peak
hour vehicular trip. Portions of this fee may
be offset by traffic improvements made to the
S. Frontage Rd. to specifically include S.
Frontage Rd. roadway widening, S. Frontage
Rd. sidewalk improvements, and the
construction of a Transit stop. The traffic
analysis dated 7/20/06 indicates that the net
increase in peak hour vehicular trips is 30;
therefore a fee of $195,000 shall be assessed.
Traffic Fee:
Current Recommendation
•It is also recommended that portions of
this fee may be offset by offsite traffic/
transportation improvements that are
not required by the development;
specifically, the sidewalk from the west
property line to Buffehr Creek Road.
We are requesting that the condition
remain the same as the previous approval
Request
•Requesting approval of the revised
project with revised traffic impact fee
condition (per original approval)